Sample records for contractor engineering logistics

  1. 76 FR 42119 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    .... Government and contractor engineering and logistics support services, and other related elements of logistics... documentation, U.S. Government and contractor engineering and logistics support services, and other related... range of adverse battlefield conditions. The hardware itself is Unclassified. The engineering design and...

  2. 76 FR 68429 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... documentation, U.S. Government and contractor engineering, technical, and logistics personnel support services, and other related elements of logistics support. (iv) Military Department: Navy (USMC) (SDH). (v.... Government and contractor engineering, technical, and logistics personnel [[Page 68432

  3. 76 FR 40707 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... training and training equipment, support equipment, U.S. Government and contractor engineering, logistics... training equipment, support equipment, U.S. Government and contractor engineering, logistics, and technical... access to SSEE Increment F services via standard Service Oriented Architecture (SOA) interfaces via...

  4. 78 FR 36538 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... training equipment, U.S. Government and contractor engineering, technical and logistics support services... equipment, U.S. Government and contractor engineering, technical and logistics support services, and other... central government and the country's outlying areas. The sale of these C-130Js to Libya will significantly...

  5. 77 FR 32598 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... engineering and logistics support services, and other related elements of logistics support. (iv) Military.... Government and contractor engineering and logistics support services, and other related elements of logistics... acceptable military balance in the area. The Republic of Korea (ROK) intends to use the HARPOON Block II...

  6. Analysis of Contractor Logistics Support for the P-8 Poseidon Aircraft

    DTIC Science & Technology

    2008-06-01

    15. NUMBER OF PAGES 103 14. SUBJECT TERMS Original Equipment Manufacturer, Contractor Logistics Support, P-8A Aircraft , 16. PRICE CODE 17...Communications Rack Mission Equipment Rack Galley G4 INMARSAT Antenna MAD Folding Stairs Crew Rest Observer Stations (2) CFM-56-7B 180 kVA IDG Engines (2...Poseidon Aircraft By: Shane Tallant, Scott Hedrick, and Michael Martin Advisors: Diana Petross Keebom Kang

  7. 78 FR 59342 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... related elements of logistical and program support. (iv) Military Department: Air Force (QAI) (v) Prior... contractor engineering, technical and logistics support services, and other related elements of logistical and program support. The estimated cost is $60 million. This proposed sale will contribute to the...

  8. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  9. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  10. Subcontracting Management Handbook

    DTIC Science & Technology

    1988-05-01

    nature Government involvement with subcontracto-s must be channeled through C.. 4prime contractor directed acti’ities. Thus. onlN the prime contractor...ae’quisit~o:3 and seconcily, ,.._ 12.* Logistics Cons’sdera- t4vocias shall ,emrforri acquixtiou p’’nn~rg and tiofls rojiduct market , suveys for i..l...quantities, and (8) Other factors such as future requirements, engineering, tooling, start- * work determined by the contracting ing load costs, market

  11. 78 FR 78939 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Quantity or Quantities of Articles or Services under Consideration for Purchase: C-130J technical, engineering and software support; software updates and patches; familiarization training for Portable Flight... and contractor technical support services; and other related elements of logistics and program support...

  12. Human Systems Integration Requirements

    DTIC Science & Technology

    2009-09-01

    52 Stratofortress, C/ KC -135 Stratotanker, E-3 Sentry and contractor logistics support aircraft; as well as a substantial jet engine inventory...www.hqda.army.mil/ teo /Sutability%20Terms%20MOA%20Oct%2005.pdf q. ISO 9241-11, Ergonomic requirements for office work with visual display terminals (VDTs

  13. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 12: PEP data item descriptions

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.

  14. The Defense Logistics Agency: Providing Logistics Support throughout the Department of Defense

    DTIC Science & Technology

    1993-10-01

    agencies, as well as its engineer, ordnance, and transportation corps. 6 As the Navy and Army recovered from these losses, the dust seemed to settle, yet... transportation and packaging assis- tance, and surveillance of contractor progress to assure timely delivery of material. To streamline contract management in DOD...Ar Foce ktem Ironsr o Ohr.cloru•e. Aki F-oce Nmw Ciamfe. 1901), 11: and ds eracbd froro Headqueree De .. L ta iercy, Weapon Sys- •mppo f Pr•gwn tohy

  15. Reducing Lifecycle Sustainment Costs

    DTIC Science & Technology

    2015-05-01

    ahead of government systems – Specific O&S needs in government: depots, software centers, VAMOSC/ ERP interfaces Implications of ERP Systems...funding is not allocated for its implementation .  Technology Refresh often requires non-recurring engineering investment, but the Working Capital Funds...VAMOSC Systems – Cost and Software Data Reports (CSDRs) • Contractor Logistics Support Contracts • Includes subcontractor reporting – Effects of

  16. Business Testing = BT. Test and Evaluation Methodology for Business Systems

    DTIC Science & Technology

    2010-05-12

    Not Intuitive Hard to Use Extensive Contractor Tail Stove Piped Systems Intelligence Transportation Logistics / Supply Finance Medical Human Resources...Capability 5 Politics Funding Requirements Busine s “IT” Acquisition Speed bumps Contracts Leadership Finance Testing Acquisition Engineering Security Legal... intelligent fool can make things bigger and more complex... It takes a touch of genius - and a lot of courage to move in the opposite direction

  17. 77 FR 52698 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... training equipment, publications and technical data, U.S. Government and contractor technical and logistics personnel services and other related elements of program and logistics support. (iv) Military Department..., publications and technical data, U.S. Government and contractor technical and logistics personnel services and...

  18. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  19. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  20. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  1. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  2. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  3. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...

  4. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...

  5. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...

  6. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...

  7. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects. (a..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture...

  8. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer of contractor inventory. The Defense Logistics Agency will pay for the movement of industrial plant...

  9. Predictive Engineering Implementation at KSC

    NASA Technical Reports Server (NTRS)

    Mosconi, Jane; Schafer, Loraine

    1995-01-01

    This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.

  10. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  11. 48 CFR 4.1801 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... States or its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE... outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE...

  12. Performance-Based Logistics, Contractor Logistics Support, and Stryker

    DTIC Science & Technology

    2007-06-15

    automotive , armament, missile, communications, special devices, and ground equipment repair. The essential maintenance task for the FMC is to maintain...technologies and welding techniques into their production processes. Finally, GDLS’s use of progressive management techniques and supply chain information...C4ISR, MEP) per the NMC criteria in the -10 manual, the contractors system only focuses on the platform or automotive status. Thus a vehicle “up” for

  13. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  14. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  15. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  16. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  17. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  18. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  19. 48 CFR 52.204-17 - Ownership or Control of Offeror.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE... outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE...

  20. NASA Space Rocket Logistics Challenges

    NASA Technical Reports Server (NTRS)

    Neeley, James R.; Jones, James V.; Watson, Michael D.; Bramon, Christopher J.; Inman, Sharon K.; Tuttle, Loraine

    2014-01-01

    The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

  1. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  2. A Guide to Resolving Disputes Over Contractor Delay Entitlements.

    DTIC Science & Technology

    1993-12-01

    E. Sanvido Associate Professor of Architectural Engineering Chin Y. Ku Professor f Civil Engineering Head of th Department of Accesion For Civil an...specifically states otherwise, the contractor is generally entitled to recover losses sustained by delays caused by the owner. 18 In the 1961 appeal, In Re...of time for causes beyond the contractor’s control foreclosed the contractor from recovering damage sustained by him because of the City’s failure to

  3. The National Shipbuilding Research Program. Application of Industrial Engineering Techniques to Reduce Worker’s Compensation and Environmental Costs - Deliverable A

    DTIC Science & Technology

    1999-10-01

    N8-96-3 Application of Industrial Engineering Techniques to Reduce Workers ’ Compensation and Environmental Costs - Deliverable A U.S. DEPARTMENT OF...disclosed in the report. As used in the above, “Persons acting on behalf of the United States Navy” includes any employee , contractor, or subcontractor to...the contractor of the United States Navy to the extent that such employee , contractor, or subcontractor to the contractor prepares, handles, or

  4. 32 CFR 169a.9 - Reviews: Existing in-house commercial activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... skill levels. (ii) Core logistics activities. The core logistics capability reported to Congress, March... either government or contractor personnel, whichever is more cost effective. Core logistics activities... submitted to the ASD (P&L). DoD Components may propose to the ASD (P&L) additional core logistics capability...

  5. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  6. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  7. 7 CFR 1788.46 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...

  8. 7 CFR 1788.46 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...

  9. 7 CFR 1788.46 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...

  10. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  11. 7 CFR 1788.46 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...

  12. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  13. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  14. 7 CFR 1788.46 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.46 General. This subpart sets forth RUS policies for minimum insurance requirements for contractors, engineers, and...

  15. Defense Logistics Agency Aviation Can Improve its Processes to Obtain Restitution From Contractors That Provide Defective Spare Parts

    DTIC Science & Technology

    2016-02-23

    supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs the public...cause correction, and status accounting of individual product quality deficiencies. The process primarily focuses on the following roles...the contractor incorrectly manufactured all 100 parts and the contractor agreed to replace them if returned. To properly account for all 100

  16. 7 CFR 1788.54 - Compliance with contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...

  17. 7 CFR 1788.54 - Compliance with contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...

  18. 7 CFR 1788.54 - Compliance with contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...

  19. 7 CFR 1788.54 - Compliance with contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...

  20. 7 CFR 1788.54 - Compliance with contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.54 Compliance with... engineer, architect, and the contractor have insurance that complies with their contract requirements. ...

  1. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  2. Key aspects in managing safety when working with multiple contractors: A case study.

    PubMed

    Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.

  3. 77 FR 53180 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... logistical and program support. (iv) Military Department: Air Force (CCZ, Amd 7). (v) Prior Related Cases, if.... Government and contractor technical and logistics support services; and other related elements of logistical and program support. The estimated cost is $850 million. This proposed sale will contribute to the...

  4. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  5. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  6. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  7. 48 CFR 209.403 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Senior Procurement Executive Defense Logistics Agency—The Special Assistant for Contracting Integrity...) Are authorized to debar or suspend contractors located within the official's geographic area of...) The Defense Logistics Agency Special Assistant for Contracting Integrity is the exclusive...

  8. 48 CFR 209.403 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Senior Procurement Executive Defense Logistics Agency—The Special Assistant for Contracting Integrity...) Are authorized to debar or suspend contractors located within the official's geographic area of...) The Defense Logistics Agency Special Assistant for Contracting Integrity is the exclusive...

  9. 48 CFR 209.403 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Executive Defense Logistics Agency—The Special Assistant for Contracting Integrity National Geospatial... suspend contractors located within the official's geographic area of responsibility under any delegation... Logistics Agency Special Assistant for Contracting Integrity is the exclusive representative of the...

  10. 48 CFR 209.403 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Senior Procurement Executive Defense Logistics Agency—The Special Assistant for Contracting Integrity...) Are authorized to debar or suspend contractors located within the official's geographic area of...) The Defense Logistics Agency Special Assistant for Contracting Integrity is the exclusive...

  11. 48 CFR 209.403 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Executive Defense Logistics Agency—The Special Assistant for Contracting Integrity National Geospatial... suspend contractors located within the official's geographic area of responsibility under any delegation... Logistics Agency Special Assistant for Contracting Integrity is the exclusive representative of the...

  12. Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report

    DTIC Science & Technology

    2010-04-30

    amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition

  13. Alphabetic List of All DoD Prime Contractors (No Dollars), FY83.

    DTIC Science & Technology

    1983-01-01

    AIRCRAFT PARTS INC UNIVERSAL LINER OF NEW MEXICO INC UNIVERSITY FACULTY ASSOCIATES UNIVERSAL APPLICATORS INC UNIVERSAL LOGISTICS CORP UNIVERSITY MICROFILMS...LTD UNIVERSAL ASPHALT PAVING CO INC UNIVERSAL LUSITANIA MFG CORP UNIVERSITY OF HEALTH SCIENCES THE CONTRACTORS RECEIVING CONTRACTS OF S25,000 OR MORE

  14. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  15. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  16. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  17. 48 CFR 1509.170-3 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...

  18. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

  19. 7 CFR 1788.49 - Contractors' bond requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...

  20. 7 CFR 1788.49 - Contractors' bond requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...

  1. 7 CFR 1788.49 - Contractors' bond requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...

  2. 7 CFR 1788.49 - Contractors' bond requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...

  3. 7 CFR 1788.49 - Contractors' bond requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers...

  4. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  5. NASA Space Flight Vehicle Fault Isolation Challenges

    NASA Technical Reports Server (NTRS)

    Bramon, Christopher; Inman, Sharon K.; Neeley, James R.; Jones, James V.; Tuttle, Loraine

    2016-01-01

    The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

  6. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  7. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 209.570-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prospective contractor meets the definition of “lead system integrator”; (2) Consider all information... workforce or a system engineering and technical assistance contractor; (2) Shall include a plan for phasing...

  11. Feasibility Analysis and Prototyping of a Fast Autonomous Recon system

    DTIC Science & Technology

    2017-06-01

    Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22

  12. Seeing Glass Contractors Clearly.

    ERIC Educational Resources Information Center

    Deliberato, Jerry

    2003-01-01

    Offers seven tips for finding and working with an effective glass contractor. For example, schools should consider the company's reputation and longevity of service, and whether it has in-house engineering capabilities. (EV)

  13. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  14. Balancing Act: The U. S. Military’s Reliance on Contractors to Fulfill Operational-Level Logistical Requirements

    DTIC Science & Technology

    2014-05-15

    Military Sealift Command. Combat Logistics Force (PM1), 1. 40 Ibid. 41 Michael Marquez, Richard Rayos, and John Mercado . Standard Port-Visit Forecasting...Series no. 8 (2012). Marquez, Michael, John Mercado , and Richard Rayos. Standard Port-Visit Forecasting Model for U.S. Navy Husbanding

  15. Orbital transfer rocket engine technology: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Hayden, Warren R.

    1992-01-01

    An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

  16. Leadership in Government Organization Change Efforts: A Multi-Case Analysis

    DTIC Science & Technology

    2004-09-01

    cleared contractor employees on short notice, in the event of demand surges. Letting go of contractor employees was considered a safer bet than...principle can be seen in the early establishment of two reactor plant-engineering laboratories. The strong, competitive capabilities of these two...personnel. The list could extend indefinitely. Application of this principle can be seen in the early establishment of two reactor plant-engineering

  17. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... of tier, for experimental, developmental, research, design, or engineering work to be performed by...

  18. Contractor Motivation Theory and Applications.

    DTIC Science & Technology

    1981-03-01

    Project Officer, Chief, Test and Evaluation Group , US Army Procurement Research Office, ALMC. BS, Aeronautical Engineering, University of Wyoming, 1963...Contractor Motivation Theory and Applications SEE DISTRIBUTION Inclosed is a copy of subject report for your use . This report describes the DOD contractor...motivation process and various areas for improvement. In particular, it identifies effective incentives that can be used and recommends policy that

  19. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    ERIC Educational Resources Information Center

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  20. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  1. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less

  2. Implementation of Insight Responsibilities in Process Engineering

    NASA Technical Reports Server (NTRS)

    Osborne, Deborah M.

    1997-01-01

    This report describes an approach for evaluating flight readiness (COFR) and contractor performance evaluation (award fee) as part of the insight role of NASA Process Engineering at Kennedy Space Center. Several evaluation methods are presented, including systems engineering evaluations and use of systems performance data. The transition from an oversight function to the insight function is described. The types of analytical tools appropriate for achieving the flight readiness and contractor performance evaluation goals are described and examples are provided. Special emphasis is placed upon short and small run statistical quality control techniques. Training requirements for system engineers are delineated. The approach described herein would be equally appropriate in other directorates at Kennedy Space Center.

  3. DOJ News Release: Local Contractor Pleads Guilty To Defrauding City Of Sacramento Of Stimulus Funds

    EPA Pesticide Factsheets

    SACRAMENTO, Calif. — US Attorney Benjamin B. Wagner announced today that Peter Scott, President of Advantage Demolition and Engineering (ADE), 47, of Roseville, pleaded guilty today to two counts of submitting false contractor bonds.

  4. A Comparison of Alternative Methods of Obtaining Defense Logistics Agency (DLA) Cognizance Spare Parts for Contractor Furnished Equipment (CFE) during Initial Outfitting of New Construction U.S. Navy Ships

    DTIC Science & Technology

    1991-12-01

    database, the Real Time Operation Management Information System (ROMIS), and Fitting Out Management Information System (FOMIS). These three configuration...Codes ROMIS Real Time Operation Management Information System SCLSIS Ship’s Configuration and Logistics Information System SCN Shipbuilding and

  5. 48 CFR 48.102 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... engineering provisions in appropriate supply, service, architect-engineer and construction contracts as...

  6. 48 CFR 48.101 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENGINEERING Policies and Procedures 48.101 General. (a) Value engineering is the formal technique by which... performing more economically. Value engineering attempts to eliminate, without impairing essential functions... two value engineering approaches: (1) The first is an incentive approach in which contractor...

  7. 77 FR 72332 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... Burden per Response: 15 minutes. Annual Burden Hours: 15,600 hours. Needs and Uses: Contractors working...., making payments, and accounting for services provided and received. Defense Logistics Agency, Information...

  8. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... delivery schedules. (32) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors... performance in the areas of design, development, and production. (41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development...

  9. Organic Versus Contractor Logistics Support For Depot-Level Repair: Factors That Drive Sub-Optimal Decisions

    DTIC Science & Technology

    2016-02-16

    Considerations in Using CLS or Organic Support Break-Even Analysis in the Decision Process When a business decision is made in an ideal environment, all costs...Line B). The break-even point (Point C) is the production quantity where the advantage moves to a different cost curve. For a business decision...the Services to provide regular reporting to them on contractor versus organic workload and money .1415 In sum, there are laws that mandate 50/50

  10. 48 CFR 1845.503-70 - Delegations of property administration and plant clearance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the clause at 1852.245-71, Installation-Accountable Government Property, property is managed by center logistics functions using NASA internal policy and procedural guidance, except— (1) When contractors are...

  11. 48 CFR 1845.503-70 - Delegations of property administration and plant clearance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the clause at 1852.245-71, Installation-Accountable Government Property, property is managed by center logistics functions using NASA internal policy and procedural guidance, except— (1) When contractors are...

  12. 48 CFR 1845.503-70 - Delegations of property administration and plant clearance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the clause at 1852.245-71, Installation-Accountable Government Property, property is managed by center logistics functions using NASA internal policy and procedural guidance, except— (1) When contractors are...

  13. 48 CFR 1845.503-70 - Delegations of property administration and plant clearance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the clause at 1852.245-71, Installation-Accountable Government Property, property is managed by center logistics functions using NASA internal policy and procedural guidance, except— (1) When contractors are...

  14. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... rejection to the contracting officer. (c) The designee authorized to grant exemptions from value engineering...

  15. 18 CFR 50.5 - Pre-filing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ELECTRIC TRANSMISSION FACILITIES § 50.5 Pre-filing procedures. (a) Introduction. Any applicant seeking a... consultations, project engineering, route planning, environmental and engineering contractor engagement... proceeding. This description also must include the identification of the environmental and engineering firms...

  16. Excessive Profits of German Defense Contractors

    DTIC Science & Technology

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  17. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of tier, for experimental, developmental, research, design, or engineering work to be performed by... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Patent Rights-Retention by the Contractor (Short Form). 1852.227-11 Section 1852.227-11 Federal Acquisition Regulations System...

  18. 29 CFR 4.188 - Ineligibility for further contracts when violations occur.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... debarment cannot be in order where a contractor has a history of similar violations, where a contractor has... good compliance history, cooperation in the investigation, repayment of moneys due, and sufficient... & Cleaning Engineers, Inc., Decision of the Secretary, SCA 176, September 27, 1974; Ernest Roman, Decision of...

  19. 41 CFR 60-1.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., construction, transportation, research, insurance, and fund depository. The term Government contract does not.... (i) Example A: Contractor A posts on its web site an opening for a Mechanical Engineer position and... position. (ii) Example B: Contractor B posts on its web site an opening for the Accountant II position and...

  20. 41 CFR 60-1.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., construction, transportation, research, insurance, and fund depository. The term Government contract does not.... (i) Example A: Contractor A posts on its web site an opening for a Mechanical Engineer position and... position. (ii) Example B: Contractor B posts on its web site an opening for the Accountant II position and...

  1. 41 CFR 60-1.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., construction, transportation, research, insurance, and fund depository. The term Government contract does not.... (i) Example A: Contractor A posts on its web site an opening for a Mechanical Engineer position and... position. (ii) Example B: Contractor B posts on its web site an opening for the Accountant II position and...

  2. 41 CFR 60-1.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., construction, transportation, research, insurance, and fund depository. The term Government contract does not.... (i) Example A: Contractor A posts on its web site an opening for a Mechanical Engineer position and... position. (ii) Example B: Contractor B posts on its web site an opening for the Accountant II position and...

  3. 41 CFR 60-1.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., construction, transportation, research, insurance, and fund depository. The term Government contract does not.... (i) Example A: Contractor A posts on its web site an opening for a Mechanical Engineer position and... position. (ii) Example B: Contractor B posts on its web site an opening for the Accountant II position and...

  4. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Profit. (a) The TCO shall allow profit on preparations made and work done by the contractor for the..., factors to be considered include— (1) Extent and difficulty of the work done by the contractor as compared with the total work required by the contract (engineering estimates of the percentage of completion...

  5. Army Logistician. Volume 36, Issue 2, March-April 2004

    DTIC Science & Technology

    2004-04-01

    commitment. The depots’ highly skilled and motivat- ed workforces deserve our thanks for a job well done and our appreciation of the formidable...outsourcing for logistics support. Contractors are now an integral part of the wider Department of Defense workforce that delivers combat support to the...LEANNE J. WOON IS THE OFFICER COMMANDING THE LOGISTICS MANAGEMENT SQUADRON AT ROYAL NEW ZEALAND AIR FORCE (RNZAF) BASE AUCKLAND , WHERE SHE MANAGES

  6. Analysis of Logistics Support via Acquisition and Cross-Servicing Agreements and Contracted Support

    DTIC Science & Technology

    2017-12-01

    of goods and services in a contested environment and the ability to train , integrate, account, and manage civilian contractors. Survivability is...because logisticians are tasked with delivering goods and services to forces that are distributed across the globe, completing a wide variety of missions...to understand 3 where the responsibilities of logistics requirements lie and how to procure goods and services in different theaters. In an

  7. Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bandlow, Alisa; Durfee, Justin David; Frazier, Christopher Rawls

    2016-05-01

    This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

  8. Conversion of Low Quality Waste Heat to Electric Power with Small-Scale Organic Rankine Cycle (ORC) Engine/Generator Technology

    DTIC Science & Technology

    2016-06-01

    Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when

  9. 48 CFR 48.102 - Policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... services must require a mandatory value engineering program to reduce total ownership cost in accordance... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office...

  10. 48 CFR 48.102 - Policies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cost-effective value engineering procedures and processes. Agencies shall provide contractors a... services must require a mandatory value engineering program to reduce total ownership cost in accordance... VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office...

  11. 76 FR 11798 - Advisory Committee on Organ Transplantation; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Carey, HRM/Professional and Scientific Associates (PSA), the logistical support contractor for the meeting, at (703) 889-9033 or psa.com ">[email protected] psa.com . The registration deadline is March 7, 2011...

  12. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  13. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  15. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    PubMed

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  18. Using Heuristics for Supportability Analysis of Adaptive Weapon Systems in Combat

    DTIC Science & Technology

    2017-01-01

    a n/a Customer Requirements Im p o rt an ce w ei g ht f ac to r F o rc e to o p en E xt er na l d im en si o ns C D p o si ti o ni ng f ea tu...usually include Contractor Logistics Support (CLS), and the contract structure normally incentivizes CLS to exceed the KPP Operational Readiness...adaptive baseline, a viable plan for maximizing availability and reducing costs would involve an early design effort for replacing contractor maintenance

  19. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  20. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  1. 77 FR 32592 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Force, FA4686 9 CONS LGC, Beale AFB, CA. Service Type/Location: Contractor-Operated Civil Engineer Supply Store (COCESS), 30th Civil Engineering Squadron, 1515 Iceland Avenue, Room 150, Vandenberg AFB, CA...

  2. 3D engineered models for highway construction : the Iowa experience.

    DOT National Transportation Integrated Search

    2015-06-01

    3D engineered modeling is a relatively new and developing technology that can provide numerous bene ts to owners, engineers, : contractors, and the general public. This manual is for highway agencies that are considering or are in the process of s...

  3. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  4. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  5. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  6. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  7. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  8. Industrial Engineering Tool Use in Quality Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodin, Wayne; Beruvides, Mario

    This paper presents the results of an examination of industrial engineering tool use in Six Sigma projects for a contractor providing specialty manufacturing and service activities for a United States federal government agency.

  9. 48 CFR 48.104-2 - Sharing acquisition savings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT VALUE ENGINEERING Policies and Procedures 48.104-2 Sharing acquisition savings. (a... value engineering clause or alternate used, and the type of savings, as follows: Government/Contractor... percent for fixed-price contracts; or (2) 75 percent for cost-reimbursement contracts. Value engineering...

  10. 48 CFR 48.001 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VALUE ENGINEERING 48.001 Definitions. As used in this subpart— Acquisition savings means savings resulting from the application of a value engineering change proposal (VECP) to contracts awarded by the... contractor agree the VECP applies. Value engineering proposal means, in connection with an A-E contract, a...

  11. 48 CFR 48.001 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VALUE ENGINEERING 48.001 Definitions. As used in this subpart— Acquisition savings means savings resulting from the application of a value engineering change proposal (VECP) to contracts awarded by the... contractor agree the VECP applies. Value engineering proposal means, in connection with an A-E contract, a...

  12. 48 CFR 48.001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VALUE ENGINEERING 48.001 Definitions. As used in this subpart— Acquisition savings means savings resulting from the application of a value engineering change proposal (VECP) to contracts awarded by the... contractor agree the VECP applies. Value engineering proposal means, in connection with an A-E contract, a...

  13. Speech Quality Measurement

    DTIC Science & Technology

    1978-05-01

    Program is a cooperative venture between RADC and some sixty-five universities eligible to participate in the program. Syracuse Uiaiversity (Department...of Electrical and Computer Engineering), Purdue University (School of Electrical Engineering), Georgia Institute of Technology (School of Electrical...Engineering), and State University of New York at Buffalo (Department of Electrical / ,./. / Engineering) act as prime contractor schools with other

  14. Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darr, Paul S.

    2016-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of themore » cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.« less

  15. NGA East | Pacific Earthquake Engineering Research Center (PEER)

    Science.gov Websites

    the Geotechnical and Vertical WGs shown in Figure 1. The role of the different groups and participants essentially play the role of Resource Experts and the sub-award researchers and contractors play the role of Specialty Contractors. Some individuals from these two groups will also play a Proponent Expert role at

  16. Construction engineering inspection direct cost survey.

    DOT National Transportation Integrated Search

    2014-07-01

    The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...

  17. ENGINEERING BULLETIN: SUPERCRITICAL WATER OXIDATION

    EPA Science Inventory

    This engineering bulletin presents a description and status of supercritical water oxidation technology, a summary of recent performance tests, and the current applicability of this emerging technology. This information is provided to assist remedial project managers, contractors...

  18. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    PubMed

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  19. 7 CFR 1788.48 - Contract insurance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...

  20. 7 CFR 1788.48 - Contract insurance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...

  1. 7 CFR 1788.48 - Contract insurance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...

  2. 7 CFR 1788.48 - Contract insurance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...

  3. 7 CFR 1788.48 - Contract insurance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers..., engineers, and architects shall provide that they take out and maintain throughout the contract period...

  4. Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Arguello, Bryan

    This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

  5. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  6. 7 CFR 1788.55 - Providing RUS evidence.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...

  7. 7 CFR 1788.55 - Providing RUS evidence.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...

  8. 7 CFR 1788.55 - Providing RUS evidence.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...

  9. 7 CFR 1788.55 - Providing RUS evidence.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...

  10. 7 CFR 1788.55 - Providing RUS evidence.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.55 Providing RUS evidence. When RUS shall specifically so direct, the borrower shall also require the engineer, the...

  11. 48 CFR 236.604 - Performance evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...

  12. 48 CFR 236.604 - Performance evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...

  13. 48 CFR 236.604 - Performance evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...

  14. 48 CFR 236.604 - Performance evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...

  15. Automated Logistics Support Analysis Tool, Version 1.0 User’s Manual, LSA Task 101, Early LSA Strategy

    DTIC Science & Technology

    1991-05-01

    US AMCCOM INTEGRATED LOGISTIC SUPPORT OFFICE AMSMC-LSP ROCK ISLAND, IL by AMERICAN POWER JET COMPANY RIDGEFIELD, NJ ARLINGTON, VA WILLIAMSBURG, VA ST...the American Power Jet (APJ) Company , under contract to HQs AMCCOM. A major goal of the project is to unify the military and contractor approach to...and should be addressed to: George Chernowitz AMERICAN POWER JET COMPANY 705 Grand Avenue Ridgefield, New Jersey 07657 Phone: (201) 945-8203 TABLE OF

  16. "Sweatshop" Protests Raise Ethical and Practical Issues.

    ERIC Educational Resources Information Center

    van der Werf, Martin

    1999-01-01

    Student activists have put pressure on colleges and universities to toughen licensing codes aimed at eliminating sweatshop labor for college apparel made in other countries, and have had some success. However, oversight of the codes among contractors in developing countries is logistically and economically problematic. (MSE)

  17. A Study on Management of Contract Conditions of Yen Loan Projects in Philippine and Vietnam

    NASA Astrophysics Data System (ADS)

    Matsuba, Yasutaka; Ozawa, Kazumasa; Yasutani, Satoru

    FIDIC conditions of contract are used in many cases as general conditions for public works funded by Japanese yen loan, but there are cases where the particular conditions are written as to add some special clauses or change some clauses of FIDIC general conditions based on their own current contract conditions and customs, which will lead to restriction of rights and duties of the Engineer and Contractor. This paper focuses on yen loan projects in Philippine and Vietnam, and describes the actual contract management of FIDIC conditions of contract from the viewpoints such as: a) relationship between Client, Contractor and the Engineer b) claim for rights and contract managements. Based on interviews to parties concerned and literature reviews of public works concerned, contractor's rights are granted relatively wider in yen loan projects compared with locally-funded projects. However, it is also observed that the Engineer's rights are restricted by particular conditions, which is written in line with their own public procurement policies of both countries. Some discussions are added how these local procurement policies affect the implementation of FIDIC conditions of contract, and clarified what are the differences of contract management between both countries.

  18. IT Project Management and Systems Engineering Internship

    NASA Technical Reports Server (NTRS)

    Cardamone, Lauren

    2011-01-01

    In the summer of 2009 I had the privilege of participating in the NASA INSPIRE program and during the summer of 2010 I was hired by ASRC Aerospace, a NASA contractor on the USTDC contract, as an Engineering Aide. These experiences combined inspired me to pursue a career in engineering and a goal to work as a NASA engineer and astronaut.

  19. US Army War College Key Strategic Issues List

    DTIC Science & Technology

    2006-07-01

    Soldier vs contractor operated and maintained tactical equipment. Are the new soldier systems so " high tech " that we cannot fight wars without contractors...approaches to meet the high tech skills demanded by our transformation TOEs? (G-3 ACD) 9. War and Society: a. Has the Army adapted from Industrial-Age...61 United States Military Academy ...................................... 65 U.S. Army Corps of Engineers

  20. Application of the HARDMAN methodology to the single channel ground-airborne radio system (SINCGARS)

    NASA Astrophysics Data System (ADS)

    Balcom, J.; Park, J.; Toomer, L.; Feng, T.

    1984-12-01

    The HARDMAN methodology is designed to assess the human resource requirements early in the weapon system acquisition process. In this case, the methodology was applied to the family of radios known as SINCGARS (Single Channel Ground-Airborne Radio System). At the time of the study, SINCGARS was approaching the Full-Scale Development phase, with 2 contractors in competition. Their proposed systems were compared with a composite baseline comparison (reference) system. The systems' manpower, personnel and training requirements were compared. Based on RAM data, the contractors' MPT figures showed a significant reduction from the figures derived for the baseline comparison system. Differences between the two contractors were relatively small. Impact and some tradeoff analyses were hindered by data access problems. Tactical radios, manpower and personnel requirements analysis, impact and tradeoff analysis, human resource sensitivity, training requirements analysis, human resources in LCSMM, and logistics analyses are discussed.

  1. 76 FR 50267 - Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Engineering, Rockwell Engineering, Excel Logistics, and American Food and Vending, Calhoun Spotting Services... Corporation, Conestoga Rovers and Associates, Phillips Engineering, Rockwell Engineering, Excel Logistics, and..., Excel Logistics, and American Food and Vending, Calhoun Spotting Service, and Job World, Inc. working on...

  2. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  3. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  4. 48 CFR 1523.703-1 - Acquisition of environmentally preferable meeting and conference services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... purchasing agreement that includes contractor support for meeting and conference planning and logistics must include a green meeting and conference requirement. The contracting officer shall ensure language is... as the provision at 1552.223-71, EPA Green Meetings and Conferences, in solicitations for meeting and...

  5. 48 CFR 1523.703-1 - Acquisition of environmentally preferable meeting and conference services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... purchasing agreement that includes contractor support for meeting and conference planning and logistics must include a green meeting and conference requirement. The contracting officer shall ensure language is... as the provision at 1552.223-71, EPA Green Meetings and Conferences, in solicitations for meeting and...

  6. 48 CFR 1523.703-1 - Acquisition of environmentally preferable meeting and conference services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... purchasing agreement that includes contractor support for meeting and conference planning and logistics must include a green meeting and conference requirement. The contracting officer shall ensure language is... as the provision at 1552.223-71, EPA Green Meetings and Conferences, in solicitations for meeting and...

  7. 48 CFR 1523.703-1 - Acquisition of environmentally preferable meeting and conference services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... purchasing agreement that includes contractor support for meeting and conference planning and logistics must include a green meeting and conference requirement. The contracting officer shall ensure language is... as the provision at 1552.223-71, EPA Green Meetings and Conferences, in solicitations for meeting and...

  8. 78 FR 23194 - Federal Acquisition Regulation; Commercial and Government Entity Code

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... Award Management Name Change, Phase 1 Implementation) which will make a global update to all of the... outside the United States; and Support supply chain traceability and integrity efforts. II. Discussion and.... For Contractors registered in the System for Award Management (SAM), the DLA Logistics Information...

  9. 77 FR 13564 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    .... Government and contractor technical assistance and other related logistics support. \\*\\ as defined in Section... the ability to integrate the Helmet Mounted Cueing System. The software algorithms are the most sensitive portion of the AIM-9X-2 missile. The software continues to be modified via a pre- planned product...

  10. 78 FR 12051 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which was submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information, which is related to the Nonroad Diesel Engine Program will begin on February 22, 2013.

  11. Ensuring Operational Access: Leveraging Engineering Contractors in the Pacific

    DTIC Science & Technology

    2015-05-21

    could leverage manpower already in theater and did not compete for limited military lift to deploy into theater.48 The second circumstance involved...Report highlighted that expeditionary contractors filled critical manpower gaps when political decisions limited the amount of military forces in a...direct the US Navy to redeploy fleet units to the Atlantic. This produced a shipping shortage in the Pacific and slowed work between May and August

  12. 7 CFR 1753.7 - Plans and specifications (P&S).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specifications prepared by the borrower's engineer. The specifications prepared by the borrower's engineer and... its contractor complies with the insurance and bond requirements. (4) Telecommunications software license provision. If the borrower is required to enter into a software license agreement in order to use...

  13. 7 CFR 1753.7 - Plans and specifications (P&S).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specifications prepared by the borrower's engineer. The specifications prepared by the borrower's engineer and... its contractor complies with the insurance and bond requirements. (4) Telecommunications software license provision. If the borrower is required to enter into a software license agreement in order to use...

  14. 7 CFR 1753.7 - Plans and specifications (P&S).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specifications prepared by the borrower's engineer. The specifications prepared by the borrower's engineer and... its contractor complies with the insurance and bond requirements. (4) Telecommunications software license provision. If the borrower is required to enter into a software license agreement in order to use...

  15. 7 CFR 1753.7 - Plans and specifications (P&S).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specifications prepared by the borrower's engineer. The specifications prepared by the borrower's engineer and... its contractor complies with the insurance and bond requirements. (4) Telecommunications software license provision. If the borrower is required to enter into a software license agreement in order to use...

  16. 48 CFR 52.248-3 - Value Engineering-Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Value Engineering....248-3 Value Engineering—Construction. As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2010) (a) General. The Contractor is encouraged to develop, prepare, and submit...

  17. 48 CFR 52.248-3 - Value Engineering-Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Value Engineering....248-3 Value Engineering—Construction. As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2010) (a) General. The Contractor is encouraged to develop, prepare, and submit...

  18. 48 CFR 52.248-3 - Value Engineering-Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Value Engineering....248-3 Value Engineering—Construction. As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2010) (a) General. The Contractor is encouraged to develop, prepare, and submit...

  19. 48 CFR 52.248-3 - Value Engineering-Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Value Engineering....248-3 Value Engineering—Construction. As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2010) (a) General. The Contractor is encouraged to develop, prepare, and submit...

  20. 48 CFR 52.248-3 - Value Engineering-Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Value Engineering....248-3 Value Engineering—Construction. As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2010) (a) General. The Contractor is encouraged to develop, prepare, and submit...

  1. But I'm an engineer—not a contracts lawyer!

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Bass, Harvey

    2012-09-01

    Industrial partners, commercial vendors, and subsystem contractors play a large role in the design and construction of modern telescopes. Because many telescope projects carry relatively small staffs, engineers are often required to perform the additional functions of technical writing, cost estimating, and contract bidding and negotiating. The skills required to carry out these tasks are not normally taught in traditional engineering programs. As a result, engineers often learn to write Request for Proposals (RFPs), select vendors, and negotiate contracts by trial-and-error and/or by adapting previous project documents to match their own requirements. Typically, this means that at the end of a contract the engineer has a large list of do's, don'ts, and lessons learned for the next RFP he or she must generate. This paper will present one such engineer's experience writing and bidding proposal packages for large telescope components and subsystems. Included are: thoughts on structuring SOWs, Specs, ICDs, and other RFP documents; modern methods for bidding the work; and systematic means for selecting and negotiating with a contractor to arrive at the best value for the project.

  2. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.50 Acceptable...

  3. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.50 Acceptable...

  4. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.50 Acceptable...

  5. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.50 Acceptable...

  6. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.50 Acceptable...

  7. Strategic Defense Initiative Demonstration/Validation Program Environmental Assessment. Space-Based Surveillance and Tracking System (SSTS),

    DTIC Science & Technology

    1987-08-01

    take place in both contractor and government facilities. The on-orbit evaluation could utilize modified launch facilities depending on the launch...technological issues : o Telescope Optics: Verify that the distortions associated vith large optical elements satisfy detection and tracking requirements; verify...Validation program vould be car- ried out at contractor facilities that 1’ave not been identified and at six government facilities (Arnold Engineering

  8. 48 CFR 52.204-18 - Commercial and Government Entity Code Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency... NATO Support Agency (NSPA) to entities located outside the United States and its outlying areas that... code on the contract. (c) Contractors located in the United States or its outlying areas that are not...

  9. 78 FR 701 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... military balance in the region. The principal contractors will be 3Di Technologies and L-3 Communications.... FOR FURTHER INFORMATION CONTACT: Ms. B. English, DSCA/DBO/CFM, (703) 601-3740. The following is a copy... elements of logistics and program support. (iv) Military Department: Army (AAO, Amd 6) (v) Prior Related...

  10. Impact of CALS on Electronic Publishing Systems and Users.

    ERIC Educational Resources Information Center

    Beazley, William G.

    1990-01-01

    The U.S. Department of Defense has begun using its buying power to enforce standards on the vendors and contractors of automatic data processing hardware and software. An example of this, the Computer-Aided Acquisition and Logistic Support (CALS) program, is described, and how it will affect electronic publishing systems is discussed. (five…

  11. Recent workforce trends and their effects on the silviculture program in British Columbia

    Treesearch

    John Betts

    2008-01-01

    British Columbia's entrepreneurial silviculture sector provides a reliable just-in-time service delivery of forestry activities from planting trees to fighting wildfires. Transient, and seeming to rely often on improvisation, contractors actually run logistically sophisticated businesses that are able to match varying field conditions to the biological and...

  12. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  13. 15 CFR 760.3 - Exceptions to prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., a U.S. contractor building an industrial facility in boycotting country Y is asked by B, a resident... agency of boycotting country Y to build a pipeline. Y requests A to suggest qualified engineering firms... conducts its operations, to identify qualified engineering firms to its customers so that its customers may...

  14. 15 CFR 760.3 - Exceptions to prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., a U.S. contractor building an industrial facility in boycotting country Y is asked by B, a resident... agency of boycotting country Y to build a pipeline. Y requests A to suggest qualified engineering firms... conducts its operations, to identify qualified engineering firms to its customers so that its customers may...

  15. Transient Seepage Analyses in Levee Engineering Practice

    DTIC Science & Technology

    2016-07-01

    and contractors in conventional engineering practice has outpaced the development of guidance documents and design recommendations. The major...ERDC TR-16-8 99 B.5 Final solution The final solution is obtained by first solving for ht from Equation B.5 as follows: t t tssˆh h h  (B

  16. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart applies to contracts with either profit or nonprofit organizations, including nonprofit... engineering and technical direction work performed by a contractor that does not have overall contractual...

  17. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  18. Transforming System Engineering through Model-Centric Engineering

    DTIC Science & Technology

    2015-11-18

    best practices and provide computational technologies for real-time training within digital engineering environments  Multidisciplinary System...MBSE well due to continued training and practicing . While MBSE is a part of the MCE it does not encompass the full idea and enabling technologies of... practices against other Industry contractors and it was believed that ABC was trailing the others in the use of MDAO capabilities. They decided that

  19. 7 CFR 1788.51-1788.53 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers §§ 1788.51-1788.53...

  20. 7 CFR 1788.51-1788.53 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers §§ 1788.51-1788.53...

  1. 7 CFR 1788.51-1788.53 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers §§ 1788.51-1788.53...

  2. 7 CFR 1788.51-1788.53 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers §§ 1788.51-1788.53...

  3. 7 CFR 1788.51-1788.53 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers §§ 1788.51-1788.53...

  4. Translating supportability requirements into design reality

    NASA Astrophysics Data System (ADS)

    Buche, J.; Cohen, I.

    1986-10-01

    This paper explores some of the principal issues in the integration of supportability into the design process. Roles of the contractor's design, supportability and management specialists and their government counterparts are discussed as they relate to logistics influence in design. Methods and processes by which weapon system logistics and readiness requirements are established, assessed, allocated to system elements and translated into specific design features are described. Tradeoff consideration, an approach to effective tradeoff criteria, and the progress of supportability issues through the program phases are identified with particular emphasis on the necessity for developing and maintaining an effective audit trail.

  5. Our Logistics Failure - The Military’s Overreliance Upon Sustainment Contracting

    DTIC Science & Technology

    2011-06-17

    backdrop for this discussion. In what has been dubbed the “ Jasmine Revolution,” the Tunisian Government under Ben Ali fell on 31 January 2011 in an...by U.S. forces. In 54 essence , contractors did what the U.S. Government could not. To get their fuel through (and make a nice profit from the

  6. 2007-2008 Weapon Systems

    DTIC Science & Technology

    2007-01-01

    240 Tactical Operations Center ( TOC ) .......................................................................242 Tactical Unmanned Aerial...4QFY06: CHS-3 contract transferred from AMCOM Acq Ctr to CECOM Acq Ctr as a result of the PD CHS move from PM TOCs /AMDCCS to PM TRCS in FY06...SALES None CONTRACTORS IRB Bays manufacturer: General Dynamics Santa Barbara Sistemas (Kaiserslautern, Germany) Logistic support: AM General (Livonia, MI

  7. Joint Implications for Contracted Logistics

    DTIC Science & Technology

    2007-03-30

    authority with the host nation country and policy on using UCMJ for contracted personnel. As tailored theater policies are developed and contracting...responsibility, this paper recommends better joint training, leader development and joint enablers for contracting operations. JOINT...U.S. Joint Forces Command (JFCOM) are analyzing Congressional and DOD policy to develop procedures and force structure to support contractor

  8. Mixture design procedure for flexible base.

    DOT National Transportation Integrated Search

    2013-04-01

    This document provides information on mixture design requirements for a flexible base course. Sections : design requirements, job mix formula, contractor's responsibility, and engineer's responsibility. Tables : material requirements; requirements fo...

  9. Supply Chain Engineering and the Use of a Supporting Knowledge Management Application

    NASA Astrophysics Data System (ADS)

    Laakmann, Frank

    The future competition in markets will happen between logistics networks and no longer between enterprises. A new approach for supporting the engineering of logistics networks is developed by this research as a part of the Collaborative Research Centre (SFB) 559: "Modeling of Large Networks in Logistics" at the University of Dortmund together with the Fraunhofer-Institute of Material Flow and Logistics founded by Deutsche Forschungsgemeinschaft (DFG). Based on a reference model for logistics processes, the process chain model, a guideline for logistics engineers is developed to manage the different types of design tasks of logistics networks. The technical background of this solution is a collaborative knowledge management application. This paper will introduce how new Internet-based technologies support supply chain design projects.

  10. NASA on a Strong Roll in Preparing Space Launch System Flight Engines

    NASA Image and Video Library

    2017-08-09

    NASA is on a roll when it comes to testing engines for its new Space Launch System (SLS) rocket that will send astronauts to deep-space destinations, including Mars. Just two weeks after the third test of a new RS-25 engine flight controller, the space agency recorded its fourth full-duration controller test Aug. 9 at Stennis Space Center near Bay St. Louis, Mississippi. Engineers conducted a 500-second test of the RS-25 engine controller on the A-1 Test Stand at Stennis. The test involved installing the controller on an RS-25 development engine and firing it in the same manner, and for the same length of time, as needed during an actual SLS launch. The test marked another milestone toward launch of the first integrated flight of the SLS rocket and Orion crew vehicle. Exploration Mission-1 will be an uncrewed mission into lunar orbit, designed to provide a final check-out test of rocket and Orion capabilities before astronauts are returned to deep space. The SLS rocket will be powered at launch by four RS-25 engines, providing a combined 2 million pounds of thrust, and with a pair of solid rocket boosters, providing more than 8 million pounds of total thrust. The RS-25 engines for the initial SLS flights are former space shuttle main engines that are now being used to launch the larger and heavier SLS rocket and with the new controller. The controller is a critical component that operates as the engine “brain” that communicates with SLS flight computers to receive operation performance commands and to provide diagnostic data on engine health and status. Engineers conducted early prototype tests at Stennis to collect data for development of the new controller by NASA, RS-25 prime contractor Aerojet Rocketdyne and subcontractor Honeywell. Testing of actual flight controllers began at Stennis in March. NASA is testing all controllers and engines designated for the EM-1 flight at Stennis. It also will test the SLS core stage for the flight at Stennis, which will involve installing the stage on the B-2 Test Stand and firing its four RS-25 engines simultaneously, as during an actual launch. RS-25 tests at Stennis are conducted by a team of NASA, Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the RS-25 prime contractor. Syncom Space Services is the prime contractor for Stennis facilities and operations.

  11. Orbital Transfer Vehicle (OTV) engine study. Phase A: Extension

    NASA Technical Reports Server (NTRS)

    Sobin, A. J.

    1980-01-01

    The current Phase A-Extension of the OTV engine study program aims to provide additional expander and staged combustion cycle data that will lead to design definition of the OTV engine. The proposed program effort seeks to optimize the expander cycle engine concept (consistent with identified OTV engine requirements), investigate the feasibility of kitting the staged combustion cycle engine to provide extended thrust operation, and conduct in-depth analysis of development risk, crew safety, and reliability for both cycles. Additional tasks address the costing of a 10/K thrust expander cycle engine and support of OTV systems study contractors.

  12. Environmental Impact Statement for Proposed Closure of Los Angeles Air Force Base, California and Relocation of Space Systems Division

    DTIC Science & Technology

    1990-05-01

    FFRDC); and the Systems Engineering Technical Assistance (SETA) contractor to selected Air Force bases including: Vandenberg AFB California; March AFB...05/21/90 comptroller, acquisition civil engineering , legal, security, communications-computer systems, product assurance, and safety, among others...housing units were constructed in 1983. The Fort MacArthur Housing Area also includes administrative offices, several warehouses, and civil engineering

  13. An overview of the Small Engine Component Technology (SECT) studies

    NASA Technical Reports Server (NTRS)

    Vanco, M. R.; Wintucky, W. T.; Niedzwiecki, R. W.

    1986-01-01

    The objectives of the joint NASA/Army SECT Studies were to identify high payoff technologies for year 2000 small gas turbine engine applications and to provide a technology plan for guiding future research and technology efforts applicable to rotorcraft, commuter and general aviation aircraft and cruise missiles. Competitive contracts were awarded to Allison, AVCO Lycoming, Garrett, Teledyne CAE and Williams International. This paper presents an overview of the contractors' study efforts for the commuter, rotorcraft, cruise missile, and auxiliary power (APU) applications with engines in the 250 to 1,000 horsepower size range. Reference aircraft, missions and engines were selected. Advanced engine configurations and cycles with projected year 2000 component technologies were evaluated and compared with a reference engine selected by the contractor. For typical commuter and rotorcraft applications, fuel savings of 22 percent to 42 percent can be attained. For $1/gallon and $2/gallon fuel, reductions in direct operating cost range from 6 percent to 16 percent and from 11 percent to 17 percent respectively. For subsonic strategic cruise missile applications, fuel savings of 38 percent to 54 percent can be achieved which allows 35 percent to 60 percent increase in mission range and life cycle cost reductions of 40 percent to 56 percent. High payoff technologies have been identified for all applications.

  14. Naval Open Architecture Contract Guidebook for Program Managers

    DTIC Science & Technology

    2010-06-30

    a whole, transform inputs into outputs. [IEEE/EIA Std. 12207 /1997] “APP233/ ISO 10303” – APP233 an “Application Protocol” for Systems Engineering...Language Metadata Interchange (XMI) and AP233/ ISO 10303). The contractor shall identify the proposed standards and formats to be used. The contractor...ANSI ISO /IEC 9075-1, ISO /IEC 9075-2, ISO /IEC 9075-3, ISO /IEC 9075-4, ISO /IEC 9075-5) 2. HTML for presentation layer (e.g., XML 1.0

  15. NASA Excellence Award for Quality and Productivity 1989 highlights. The 1989 recipient: Lockheed Engineering and Sciences Company

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The NASA Excellence Award for Productivity and Quality is the result of NASA's desire to encourage superior quality and the continuous improvement philosophy in the aerospace industry. It is awarded to NASA contractors, subcontractors, and suppliers who have demonstrated sustained excellence, customer orientation, and outstanding achievements in a total quality management (TQM) environment. The 'highlights' booklet is intended to transfer successful techniques demonstrated by the performance and quality of major NASA contractors.

  16. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  17. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  18. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  19. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  20. Skylab

    NASA Image and Video Library

    1973-05-01

    Engineers from the Marshall Space Flight Center (MSFC) and its contractors were testing the twin-pole sunshade at the Skylab mockup in the MSFC Building 4619. The Skylab Orbital Workshop (OWS) lost its thermal protection shield during launch on May 14, 1963. Without the heat shield, the temperature inside the OWS became dangerously high, rendering the workshop uninhabitable and threatened deterioration of the interior insulation and adhesive. Engineers from the MSFC, its contractors, and NASA persornel at other centers worked day and night for several days to develop the way to save the Skylab OWS. Eventually, they developed, tested, rehearsed, and approved three repair options. These options included a parasol sunshade and a twin-pole sunshade to restore the temperature inside the workshop, and a set of metal cutting tools to free the jammed solar panel.

  1. Overview of NASA MSFC IEC Federated Engineering Collaboration Capability

    NASA Technical Reports Server (NTRS)

    Moushon, Brian; McDuffee, Patrick

    2005-01-01

    The MSFC IEC federated engineering framework is currently developing a single collaborative engineering framework across independent NASA centers. The federated approach allows NASA centers the ability to maintain diversity and uniqueness, while providing interoperability. These systems are integrated together in a federated framework without compromising individual center capabilities. MSFC IEC's Federation Framework will have a direct affect on how engineering data is managed across the Agency. The approach is directly attributed in response to the Columbia Accident Investigation Board (CAB) finding F7.4-11 which states the Space Shuttle Program has a wealth of data sucked away in multiple databases without a convenient way to integrate and use the data for management, engineering, or safety decisions. IEC s federated capability is further supported by OneNASA recommendation 6 that identifies the need to enhance cross-Agency collaboration by putting in place common engineering and collaborative tools and databases, processes, and knowledge-sharing structures. MSFC's IEC Federated Framework is loosely connected to other engineering applications that can provide users with the integration needed to achieve an Agency view of the entire product definition and development process, while allowing work to be distributed across NASA Centers and contractors. The IEC DDMS federation framework eliminates the need to develop a single, enterprise-wide data model, where the goal of having a common data model shared between NASA centers and contractors is very difficult to achieve.

  2. Managing NASA's International Space Station Logistics and Maintenance program

    NASA Astrophysics Data System (ADS)

    Butina, Anthony J.

    2001-02-01

    The International Space Station will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines-it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally complete in April of 2006. Space logistics is a new concept that will have wide reaching consequences for both space travel and life on Earth. What is it like to do something that no one has done before? What challenges do you face? What kind of organization do you put together to perform this type of task? How do you optimize your resources to procure what you need? How do you change a paradigm within a space agency? How do you coordinate and manage a one of a kind system with approximately 5,700 Orbital Replaceable Units (ORUs)? How do you plan for preventive and corrective maintenance, when you need to procure spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors? How do you transport large sections of ISS hardware around the country? These are some of the topics discussed in this paper. From conception to operation, the ISS requires a unique approach in all aspects of development and operation. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station and only time will tell if we did it right. This paper discusses some of the experiences of the author after working 12 years on the International Space Station's integrated logistics & maintenance program. From his early days as a contractor supportability engineer and manager, to the NASA manager responsible for the entire ISS Logistics and Maintenance program. .

  3. 6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE RIVER BRIDGE, ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, PARHAM CONT. CO., CONTRACTOR' - Augusta Bridge, Spanning White River at Highway 64, Augusta, Woodruff County, AR

  4. Cellular Stress Response to Engineered Nanoparticles: Effect of Size, Surface Coating, and Cellular Uptake

    EPA Science Inventory

    CELLULAR STRESS RESPONSE TO ENGINEERED NANOPARTICLES: EFFECT OF SIZE, SURFACE COATING, AND CELLULAR UPTAKE RY Prasad 1, JK McGee2, MG Killius1 D Ackerman2, CF Blackman2 DM DeMarini2 , SO Simmons2 1 Student Services Contractor, US EPA, RTP, NC 2 US EPA, RTP, NC The num...

  5. LABORATORY AND FIELD AUDITS AS PART OF THE EPA (ENVIRONMENTAL PROTECTION AGENCY) HAZARDOUS WASTE ENGINEERING RESEARCH LABORATORY (HWERL) QUALITY ASSURANCE PROGRAM

    EPA Science Inventory

    Audits are an important and integral part of the EPA Hazardous Waste Engineering Research Laboratory (HWERL) Quality Assurance (QA) Program. As part of the overall QA program, audits are used to determine contractor compliance with quality assurance plans and to assess the overal...

  6. The Status and Future of Aerospace Engineering Education in Turkey.

    ERIC Educational Resources Information Center

    Hale, Francis J.

    There is no aerospace industry in Turkey, and the level of operational activity is low even though the potential for the exploitation of aviation is high. The government of Turkey hopes to establish an aircraft factory in conjunction with a foreign contractor and is aware of the need for aerospace engineering education. This paper describes the…

  7. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  8. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  9. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  10. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  11. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  12. Camp Minden Fact Sheet July 2015

    EPA Pesticide Factsheets

    The Louisiana Military Department (LMD) led a Community Meeting on June 30, 2015. The LMD contractor, Explosive Service Intl., and its subcontractor El Dorado Engineering, presented details of Contained Burn System (CBS).

  13. Acquisition Research Topics Catalog.

    DTIC Science & Technology

    1979-01-01

    tion maintenance, and redistribution Control levels based on standard formu- and marketing ) impact the acquisi- las will also change quite rapidly...production processes, the necessary lead times could be updated for like items based upon current market experience. By Air Force Logistics Command (AFLC...seller prime contractors are subcontracting situations has led to a growing realiza- significant portions of the prime tion that market theory

  14. Land Warrior (LW)/Mounted Warrior (MW) DOTMLPF Assessment

    DTIC Science & Technology

    2007-06-01

    the DOTMLPF impacts of equipping a Stryker battalion with MW and LW? 3) What is the estimated life cycle cost (LCC) of each LW BOIP alternative? 4...A R E D A T A Assessed costs included: - Support Equipment/Disposal. - Contractor Logistics Support. - Ensemble Hardware...DOTMLPF . 3 - Cost . LUT Navigation Experiment Lethality Experiment AMSAA TRAC-WSMR TRAC-WSMR ATEC LW Test Unit

  15. A New Availability-Payment Model for Pricing Performance-Based Logistics Contracts

    DTIC Science & Technology

    2014-06-17

    the contractor maintains a steady revenue (with profit ). Figure 4. Affine Controller Model for Availability Contract Acquisition Research Program... a bankruptcy constraint; and and Deduction(∙) are decision variables for contract design for the level one (public sector) problem. Given...UMD-CM-14-175 ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES A New “Availability-Payment” Model for Pricing Performance- Based

  16. Asbestos Removal Case History.

    ERIC Educational Resources Information Center

    Haney, Stanley J.

    1986-01-01

    The engineer for a California school district describes the asbestos removal from the ceilings of El Camino High School. Discusses forming a design team, use of consultants, specifications, relations with contractors, and staff notification. (MLF)

  17. 48 CFR 52.204-2 - Security Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M... architect-engineer contract, add the following paragraph (e) to the basic clause: (e) The Contractor shall...

  18. Materials engineering data base

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The various types of materials related data that exist at the NASA Marshall Space Flight Center and compiled into databases which could be accessed by all the NASA centers and by other contractors, are presented.

  19. Defense Logistics Agency Disposition Services Needs to Improve Demilitarization Program Self-Assessment Evaluations - Redacted

    DTIC Science & Technology

    2016-12-20

    Program Self -Assessment Evaluations I N T E G R I T Y  E F F I C I E N C Y  A C C O U N T A B I L I T Y  E X C E L L E N C E Mission Our mission...Project No. D2016-D000RD-0057.000) │ i Results in Brief Defense Logistics Agency Disposition Services Needs to Improve Demilitarization Program Self ...mutilation contractor3 in Holbrook, New York, the two sites we visited. However, for self -assessment evaluations4 at three DLA Centralized

  20. 29 CFR 1952.107 - Changes to approved plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...

  1. Technical Solutions to Common Indoor Air Quality Issues in Schools

    EPA Pesticide Factsheets

    Indoor Air Quality (IAQ) Design Tools for Schools provides voluntary guidance for school personnel, architects, engineers, builders and contractors, parents, and the community on key school construction and renovation issues.

  2. 7 CFR 1767.10 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment, design... the removal of the property retired. Research, Development, and Demonstration (RD&D) includes all...

  3. 7 CFR 1767.10 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment, design... the removal of the property retired. Research, Development, and Demonstration (RD&D) includes all...

  4. 7 CFR 1767.10 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment, design... the removal of the property retired. Research, Development, and Demonstration (RD&D) includes all...

  5. 7 CFR 1767.10 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment, design... the removal of the property retired. Research, Development, and Demonstration (RD&D) includes all...

  6. 7 CFR 1767.10 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment, design... the removal of the property retired. Research, Development, and Demonstration (RD&D) includes all...

  7. 24th Annual Logistics Conference and Exhibition

    DTIC Science & Technology

    2008-03-13

    Mission / Financial • Beliefs • Organizational Cultures Management and Control Systems • Agency Mission Statements • Process Metrics/Key Performance... Juan Arcocha, USA, Deputy Director for Logistics and Engineering, USNORTHCOM MG John Basilica, Jr., ARNG, Director of Logistics, J4, National Guard...Bureau Panelists:  COL Juan Arcocha, USA, Deputy Director for Logistics and Engineering, USNORTHCOM  MG John Basilica, Jr., ARNG, Director of

  8. U.S. Army Corps of Engineers Needs to Improve Contract Oversight of Military Construction Projects at Bagram Airfield, Afghanistan

    DTIC Science & Technology

    2012-11-26

    Minutes Required 116 64 142 58 380 No. of Contractor Meeting Minutes Available Preparatory Meetings Initial Meetings 0 0 18 15 0 0 20 2 38...work, for which the contractors should have prepared a total of 190 preparatory and 190 initial meeting minutes (total of 380 meeting minutes...27, 2012 DoD IG Report No. D-2010-059, “Contingency Contracting: A Framework for Reform,” May 14, 2010 DoD IG Report No. SPO -2009-005, “Assessment

  9. Defense Contractors SBIR/STTR Partnering Manual: A Primer on Technology Risk Management and Partnering Strategies

    DTIC Science & Technology

    2008-08-01

    supported. While this may not have been true during the SBIR/STTR adolescence of the 1990s, we in government realized by 1998 that small business/large...heard that SBIR/STTR topics submitted by industry, even when requested, are usu- ally rejected by DDR&E. Is this true , and if so, why – and what can do...contractors as problematic. This is especially true if a small firm lacks experience in the serial, complex steps involved in a systems engineer- ing

  10. Dollar Summary of Federal Supply Classification and Service Category by Company, FY83, Part 5 (N065-W059).

    DTIC Science & Technology

    1983-01-01

    BLDGS 1,269 PHILLIPS SWAGER ASSOCIATES ILLINOIS ARMY A/E CONSTRUCTION /ADMIN 9 SVC BLDGS 174 QUINLIVIAN PIERIK KRAUSE ROBSON JV NEW YORK NAVY A/E...CONSTRUCTION /AIRFIELD & MSL FAC RANCORN WILDMAN & KRAUSE VIRGINIA NAVY A/E CONSTRUCTION /AIRFIELD & MSL FAC REED ALONZO B MASS ARMY A/E CONSTRUCTION...ARCHITECT/ENGINEER - GENERAL CONTRACTOR TOTAL OUADRA ENGINEERING INC ALASKA OCE ARCHITECT/ENGINEER - GENERAL QUINLIVAN PIERIK & KRAUSE MASS ARMY ARCHITECT

  11. SMC Systems Engineering: Specialty Engineering Disciplines Framework and Descriptions. Volume 2

    DTIC Science & Technology

    2011-10-03

    Engineering Disciplines Updale SNiEng Planning to Meet Program Objectives 1- -----:;..._- .-----------------, I Update SIW Eng T as1<s & Timing ol T asl<s...Analyses 1-Dev SNi Eng Products e.g. Assessmenls, Rills, Certs 1- ID & Manage Resources: Tools, Equip, Skills Assess Contractors’ Compian<:e to SIW Eng...Approaches to Meet SIW Ol>jeclives S1ipulale Contraclllal Risk and Actions lot Mitigations Review Contraclors’ Tech Data (Technical & Training Manuals

  12. ELECTRICAL LINES ARRIVE FROM CENTRAL FACILITIES AREA, SOUTH OF MTR. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL LINES ARRIVE FROM CENTRAL FACILITIES AREA, SOUTH OF MTR. EXCAVATION RUBBLE IN FOREGROUND. CONTRACTOR CRAFT SHOPS, CRANES, AND OTHER MATERIALS ON SITE. CAMERA FACES EAST, WITH LITTLE BUTTE AND MIDDLE BUTTE IN DISTANCE. INL NEGATIVE NO. 335. Unknown Photographer, 7/1/1950 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  13. Infrared Inspection of New Roofs.

    DTIC Science & Technology

    1982-12-01

    USA Cold Regions Research and Engineering Laboratory, unpublished report prepared for the Directorate of Facilities Engineering, Fort Devens , Mass...SECURITY CLASSIFICATION OF THIS PAGE (When Date Entered) READ INSTRUCTIONSREPORT DOCUMENTATION PAGE BEFORE COMPLETING FORM I. REPORT NUMBER 2. GOVT...period then the contractor will become obligated to repair it rather than the owner having to pursue expensive remedial measures a few years later

  14. An overview of the small engine component technology (SECT) studies. [commuter, rotorcraft, cruise missile and auxiliary power applications in year 2000

    NASA Technical Reports Server (NTRS)

    Vanco, M. R.; Wintucky, W. T.; Niedwiecki, R. W.

    1986-01-01

    The objectives of the joint NASA/Army SECT studies were to identify high payoff technologies for year 2000 small gas turbine engine applications and to provide a technology plan for guiding future research and technology efforts applicable to rotorcraft, commuter and general aviation aircraft and cruise missiles. Competitive contracts were awarded to Allison, AVCO Lycoming, Garrett, Teledyne CAE and Williams International. This paper presents an overview of the contractors' study efforts for the commuter, rotorcraft, cruise missile, and auxiliary power (APU) applications with engines in the 250 to 1,000 horsepower size range. Reference aircraft, missions and engines were selected. Advanced engine configurations and cycles with projected year 2000 component technologies were evaluated and compared with a reference engine selected by the contractor. For typical commuter and rotorcraft applications, fuel savings of 22 percent to 42 percent can be attained. For $1/gallon and $2/gallon fuel, reductions in direct operating cost range from 6 percent to 16 percent and from 11 percent to 17 percent respectively. For subsonic strategic cruise missile applications, fuel savings of 38 percent to 54 percent can be achieved which allows 35 percent to 60 percent increase in mission range and life cycle cost reductions of 40 percent to 56 percent. High payoff technologies have been identified for all applications.

  15. FRINGE EFFECTS OF VALUE ENGINEERING. A SURVEY PREPARED BY THE TECHNICAL SUBCOMMITTEE, AOA SPECIAL COMMITTEE ON VALUE ENGINEERING FOR THE OFFICE OF THE ASSISTANT SECRETARY OF DEFENSE (INSTALLATIONS AND LOGISTICS).

    DTIC Science & Technology

    Fringe effects of value engineering. A survey prepared by the technical subcommittee, AOA special committee on value engineering for the office of the assistant secretary of defense (installations and logistics).

  16. System safety in Stirling engine development

    NASA Technical Reports Server (NTRS)

    Bankaitis, H.

    1981-01-01

    The DOE/NASA Stirling Engine Project Office has required that contractors make safety considerations an integral part of all phases of the Stirling engine development program. As an integral part of each engine design subtask, analyses are evolved to determine possible modes of failure. The accepted system safety analysis techniques (Fault Tree, FMEA, Hazards Analysis, etc.) are applied in various degrees of extent at the system, subsystem and component levels. The primary objectives are to identify critical failure areas, to enable removal of susceptibility to such failures or their effects from the system and to minimize risk.

  17. 18 CFR 367.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... retired. (40) Research, development, and demonstration (RD&D) means expenditures incurred by a service... organization (such as research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment...

  18. 18 CFR 367.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... retired. (40) Research, development, and demonstration (RD&D) means expenditures incurred by a service... organization (such as research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment...

  19. 18 CFR 367.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... retired. (40) Research, development, and demonstration (RD&D) means expenditures incurred by a service... organization (such as research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment...

  20. 18 CFR 367.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... retired. (40) Research, development, and demonstration (RD&D) means expenditures incurred by a service... organization (such as research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment...

  1. 18 CFR 367.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... retired. (40) Research, development, and demonstration (RD&D) means expenditures incurred by a service... organization (such as research institute, industry association, foundation, university, engineering company or similar contractor) in pursuing research, development, and demonstration activities including experiment...

  2. Design data brochure: SIMS prototype system 3

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.

  3. Task Force On Contractor Logistics in Support of Contingency Operations

    DTIC Science & Technology

    2014-06-01

    existing industrial base providing support services to deployed military forces should be integrated into all contingency war games and exercises...implementation of OCS in active operations has been a constant game of catch up for more than a decade. Poor contract administration, inconsistent...military forces should be integrated into all contingency war games and exercises. Equally important is including representatives from the agencies

  4. ASC Distribution Management Center (DMC) Provides Materiel Management Capability

    DTIC Science & Technology

    2008-09-01

    Distribution Management Center (DMC) is the single interface for the synchronization and integration of logistical functions among active Army units in CONUS...with an integrated team of Soldiers, government service employees, and contractors assigned to Rock Island, as well as forward-positioned Distribution ... Management Teams (DMTs) at 15 major Army installations throughout CONUS, Alaska, and Hawaii. The current DMC structure provides the benefit of

  5. International Cooperation in Acquisition, Technology and Logistics (IC in AT&L) Handbook

    DTIC Science & Technology

    2012-05-01

    Information exchanges, for instance, may lead to a cooperative RD&A project . Figure 1-1 illustrates this “ building block” concept of international...support the National Security Strategy, including the need to strengthen alliances and build partnerships. CWP projects are selected for their... projects : prime contractor (with international teaming of subcontractors), consortium and joint venture. The selection of the best industrial

  6. Shaping the Navy’s Acquisition Workforce

    DTIC Science & Technology

    2012-06-01

    Technology, and Logistics Workforce Education, Training, and Career Development Program xiv DON Department of the Navy FAI Federal Acquisition...approximately 53% of the federal AW ( FAI , 2011), meaning that the DoD absorbed the majority of the reductions. The manpower reductions were deemed necessary to...current debates (Gates, 2009). Former USD for Personnel & Readiness Bernard Rostker, writing for RAND, states that the extensive use of contractors

  7. Health Care Provided by Military Treatment Facilities to Contractors in Southwest Asia

    DTIC Science & Technology

    2009-05-04

    UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of Defense Inspector General,ODIG-AUD,400 Army Navy Drive,Arlington,VA...Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms ASD(HA...Central Command USD(AT&L) Under Secretary of Defense (Acquisition, Technology, and Logistics) INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY

  8. ADP SYSTEMS ANALYSIS - COMMITTED VS. AVAILABLE MILITARY TRANSPORTATION (LMI T1).

    DTIC Science & Technology

    LOGISTICS , * MANAGEMENT ENGINEERING), (*DATA PROCESSING, LOGISTICS), INFORMATION RETRIEVAL, SYSTEMS ENGINEERING, MILITARY TRANSPORTATION, CARGO VEHICLES, SCHEDULING, COMPUTER PROGRAMMING, MANAGEMENT PLANNING AND CONTROL

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, R.A.; Hines, T.L.

    Utilization of remote gas resources in developing countries continues to offer challenges and opportunities to producers and contractors. The Aguaytia Gas and Power Project is an example where perseverance and creativity resulted in successful utilization of natural gas resources in the Ucayali Region of Central Peru, a country which previously had no natural gas infrastructure. The resource for the project was first discovered by Mobil in 1961, and remained undeveloped for over thirty years due to lack of infrastructure and markets. Maple Gas won a competitively bid contract to develop the Aguaytia gas reserves in March of 1993. The challengesmore » facing Maple Gas were to develop downstream markets for the gas, execute contracts with Perupetro S.A. and other Peruvian government entities, raise financing for the project, and solicit and execute engineering procurement and construction (EPC) contracts for the execution of the project. The key to development of the downstream markets was the decision to generate electric power and transmit the power over the Andes to the main electrical grid along the coast of Peru. Supplemental revenue could be generated by gas sales to a small regional power plant and extraction of LPG and natural gasoline for consumption in the Peruvian market. Three separate lump sum contracts were awarded to Asea Brown Boveri (ABB) companies for the gas project, power project and transmission project. Each project presented its unique challenges, but the commonalities were the accelerated schedule, high rainfall in a prolonged wet season and severe logistics due to lack of infrastructure in the remote region. This presentation focuses on how the gas plant contractor, ABB Randall, working in harmony with the developer, Maple Gas, tackled the challenges to monetize a remote gas resource.« less

  10. A Rainbow View of NASA's RS-25 Engine Test

    NASA Image and Video Library

    2017-02-22

    NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov

  11. Army Research Office and Air Force Office of Scientific Research; 1998 Contractors’ Meeting in Chemical Propulsion Held in Long Beach, California on 29 June-1 July 1998

    DTIC Science & Technology

    1998-07-29

    of an operating Cummins NH diesel engine . TECHNICAL DISCUSSION: The chemistry of soot formation has been the subject of extensive research for many...Army Research Office. 14. SUBJECT TERMS Flames, Propulsion, Gas Turbines, Diesel Engines , Scramjets, Soot, Sprays, Turbulence, Diagnostics 17...Menon, Y. Neumeier, J. V. R. Prasad, L. Sankar, J. Seitzman; Georgia Institute of Technology Analysis of Advanced Direct-Injection Diesel Engine

  12. Army Research Office and Air Force Office of Scientific Research Contractors’ Meeting in Chemical Propulsion Held in Boulder, Colorado on June 11-13, 2007

    DTIC Science & Technology

    2007-06-01

    single-cylinder diesel engine showed that at high EGR rates, the autoignition mechanism changes from the typical single stage to a two-stage process...2002). 3. Edwards, T., Zabarnick, S. "Supercritical Fuel Deposition Mechanisms ," Industrial and Engineering Chemistry Research 32: 3117-3122 (1993...and the Air Force Office of Scientific Research. 20070910360 15. SUBJECT TERMS Flames, Propulsion, Gas Turbines, Diesel Engines , Scramjets, Pulse

  13. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... with the total work required by the contract (engineering estimates of the percentage of completion... contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  14. Poor commissioning discussed in depth.

    PubMed

    Towse, Bob; Whitby, Robin; Wignall, Stephen; Barrass, Chris; Newman, Alan; Shaw, Christopher; Johnston-Stuart, Chris; James, Chris

    2014-05-01

    Last October's Healthcare Estates 2013 conference saw one of the first day's 'Engineering' sessions debate the topic, 'Why do so many buildings disappoint their owners and occupants?' Much of the discussion centered on the problems caused by 'inadequate management of the commissioning process'. A roundtable debate jointly staged recently in London by IHEEM and the B&ES, the leading U.K. trade association for building services engineering contractors, took the debate forward. As HEJ editor, Jonathan Baillie reports, the discussions confirmed that one of the key contributors to poor commissioning is a failure to involve specialist building services contractors sufficiently early. It was also agreed that finding a really effective 'client-side' project manager, with the panoply of skills and experience the role requires, can be 'a tough ask'. In this issue of HEJ we report on the debate's first 'half'; in June's edition, we will cover 'part two' of a lively, forthright, and positive debate.

  15. Constellation Program (CxP) Crew Exploration Vehicle (CEV) Project Integrated Landing System

    NASA Technical Reports Server (NTRS)

    Baker, John D.; Yuchnovicz, Daniel E.; Eisenman, David J.; Peer, Scott G.; Fasanella, Edward L.; Lawrence, Charles

    2009-01-01

    Crew Exploration Vehicle (CEV) Chief Engineer requested a risk comparison of the Integrated Landing System design developed by NASA and the design developed by Contractor- referred to as the LM 604 baseline. Based on the results of this risk comparison, the CEV Chief engineer requested that the NESC evaluate identified risks and develop strategies for their reduction or mitigation. The assessment progressed in two phases. A brief Phase I analysis was performed by the Water versus Land-Landing Team to compare the CEV Integrated Landing System proposed by the Contractor against the NASA TS-LRS001 baseline with respect to risk. A phase II effort examined the areas of critical importance to the overall landing risk, evaluating risk to the crew and to the CEV Crew Module (CM) during a nominal land-landing. The findings of the assessment are contained in this report.

  16. Proceedings of the Department of Energy ALARA Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Baum, J.W.

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.« less

  17. Injury Rates on New and Old Technology Oil and Gas Rigs Operated by the Largest United States Onshore Drilling Contractor

    PubMed Central

    Blackley, David J.; Retzer, Kyla D.; Hubler, Warren G.; Hill, Ryan D.; Laney, A. Scott

    2015-01-01

    Background Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. Methods We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003–2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Results Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. Conclusions For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. PMID:25164118

  18. Injury rates on new and old technology oil and gas rigs operated by the largest United States onshore drilling contractor.

    PubMed

    Blackley, David J; Retzer, Kyla D; Hubler, Warren G; Hill, Ryan D; Laney, A Scott

    2014-10-01

    Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003-2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. © 2014 Wiley Periodicals, Inc.

  19. Competition in Weapon Systems Acquisition: Cost Analyses of Some Issues

    DTIC Science & Technology

    1990-09-01

    10% increments , also known as the step-ladder bids) submitted by the contractor in the first year of dual source procurement. The triangles represent...savings by subtracting annual incremental government costs, stated in constant dollars, from (3). (5) Estimate nonrecurring start-up costs, stated in...constant dollars, by fiscal year. (6) Estimate incremental logistic support costs, stated in constant dollars. by fiscal year. (7) Calculate a net

  20. Defense Logistics Agency’s Warstopper Program

    DTIC Science & Technology

    2007-08-15

    chamber. DLA decided to fund the construction of an additional Nesatron chamber with the option to sell it to the contractor at fair market value at...stored for contingencies. Without the Warstopper investment, the Services would have to build and stock their entire wartime requirement over a 2...Contract Number Date of the Contract Item Estimated Total Value ($ thousands) Warstopper FY 2005 Value ($ thousands) 1 SP0441-05-D-1652 Sept

  1. Investigation Regarding Assertions Made by Former United Launch Alliance Executive (REDACTED)

    DTIC Science & Technology

    2016-12-05

    contractors; 3) a conversation occurred between the Under Secretary of Defense for Acquisition , Technology, and Logistics (USD[AT&L]) and the...contracting process; (2) after multiple interviews of DoD and ULA personnel and our reviews of acquisition planning documentation, contracts, and...internal DoD and ULA correspondence, we found no evidence of collusion; (3) the DoD’s implementation of its acquisition strategy was designed to

  2. Civilian Contractors Providing Logistics and Support on the Battlefield

    DTIC Science & Technology

    2008-02-19

    as possible to increase profits.5 Kellogg, Brown and Root (KBR) employees, once hired, attend training seminars to learn about their...well trained in avoiding ambushes, fire support, IEDs or what to do when attacked.18 Many civilians hired to do carpentry and electrical work, had...34 said Singer , a foreign policy researcher at the Brookings Institution. Replacing 1,100 Marine cooks with civilians, might make short-term

  3. Acquisition Logistics Guidelines for Improving the Argentine Air Force Weapon System Acquisition Process

    DTIC Science & Technology

    1999-03-01

    these kinds of sources: Industry standards Other commercial or military customers LMI specification summaries Contractor’s in-house data Section...government and industry managers to achieve program objectives. • Putting in place for fielded systems additional incentives to reduce operating and...meaning clarifications; an explanation of the roles of Congress, the Executive Branch, and Industry in defense acquisition; and an overview on the

  4. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  5. Integrated tracking of components by engineering and logistics utilizing logistics asset tracking system

    NASA Technical Reports Server (NTRS)

    Renfroe, Michael B.; Mcdonald, Edward J.; Bradshaw, Kimberly

    1988-01-01

    The Logistics Asset Tracking System (LATS) devised by NASA contains data on Space Shuttle LRUs that are daily updated to reflect such LRU status changes as repair due to failure or modification due to changing engineering requirements. The implementation of LATS has substantially increased personnel responsiveness, preventing costly delays in Space Shuttle processing and obviating hardware cannibalization. An evaluation is presented of LATS achievements in the direction of an integrated logistical support posture.

  6. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  7. Validation Test Report For The CRWMS Analysis and Logistics Visually Interactive Model Calvin Version 3.0, 10074-Vtr-3.0-00

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. Gillespie

    2000-07-27

    This report describes the tests performed to validate the CRWMS ''Analysis and Logistics Visually Interactive'' Model (CALVIN) Version 3.0 (V3.0) computer code (STN: 10074-3.0-00). To validate the code, a series of test cases was developed in the CALVIN V3.0 Validation Test Plan (CRWMS M&O 1999a) that exercises the principal calculation models and options of CALVIN V3.0. Twenty-five test cases were developed: 18 logistics test cases and 7 cost test cases. These cases test the features of CALVIN in a sequential manner, so that the validation of each test case is used to demonstrate the accuracy of the input to subsequentmore » calculations. Where necessary, the test cases utilize reduced-size data tables to make the hand calculations used to verify the results more tractable, while still adequately testing the code's capabilities. Acceptance criteria, were established for the logistics and cost test cases in the Validation Test Plan (CRWMS M&O 1999a). The Logistics test cases were developed to test the following CALVIN calculation models: Spent nuclear fuel (SNF) and reactivity calculations; Options for altering reactor life; Adjustment of commercial SNF (CSNF) acceptance rates for fiscal year calculations and mid-year acceptance start; Fuel selection, transportation cask loading, and shipping to the Monitored Geologic Repository (MGR); Transportation cask shipping to and storage at an Interim Storage Facility (ISF); Reactor pool allocation options; and Disposal options at the MGR. Two types of cost test cases were developed: cases to validate the detailed transportation costs, and cases to validate the costs associated with the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) and Regional Servicing Contractors (RSCs). For each test case, values calculated using Microsoft Excel 97 worksheets were compared to CALVIN V3.0 scenarios with the same input data and assumptions. All of the test case results compare with the CALVIN V3.0 results within the bounds of the acceptance criteria. Therefore, it is concluded that the CALVIN V3.0 calculation models and options tested in this report are validated.« less

  8. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  9. 76 FR 43988 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Sill, OK. NPAs: Professional Contract Services, Inc., Austin, TX (Prime Contractor); Work Services.... Contracting Activity: General Services Administration, Fort Worth, TX Coverage: A-List for the Total...: Department of the Army Research, Development, & Engineering Command, Natick, MA. Coverage: C-List for 100% of...

  10. Design data brochure: SIMS prototype system 2

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.

  11. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.23 How will Reclamation... expertise needed may include, but are not limited to, water management planning, engineering, hydrology...

  12. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  13. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  14. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  15. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  16. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  17. Detection of sinkholes or anomalies using full seismic wave fields : phase II [summary].

    DOT National Transportation Integrated Search

    2016-09-01

    Florida geology with its non-uniform rock and soil layers, variable deposits of poor soils (clay, organics, etc.), and weathered (and possibly voided) limestone is a major concern for design engineers, contractors, and maintenance personnel. However,...

  18. Control of Subsurface Contaminant Migration by Vertical Engineered Barriers

    EPA Science Inventory

    This Fact Sheet is intended to provide remedial project managers (RPMs), on-scene coordinators (OSCs), contractors, and other remediation stakeholders with a basic overview of hazardous waste containment systems constructed to prevent or limit the migration of contamination in gr...

  19. Identification of ergonomics interventions used to reduce musculoskeletal loading for building installation tasks.

    PubMed

    Albers, Jim; Estill, Cherie; MacDonald, Leslie

    2005-07-01

    Skilled workers in the mechanical and electrical installation (M/EI) building and construction trades experience high rates of disabling work-related musculoskeletal disorders (WMSDs). The M/EI trades involve installing piping; heating, ventilation and air conditioning (HVAC), and electrical systems in residential, commercial, and industrial buildings. In the absence of an ergonomics standard in the United States, some building and construction contractors, including M/EI sector contractors, have implemented various ergonomics interventions on their worksites on a voluntary basis. However, no data were available to determine the type of voluntary control measures being implemented, the task-specific hazards for which control measures needed to be developed or refined, and perceived barriers to improving hazard control. As part of a larger effort to obtain this data, the National Institute for Occupational Safety and Health (NIOSH) organized a stakeholder meeting to gather information regarding ergonomics interventions or "best practices" by M/EI contractors and tradespeople. The attendees included 39 industry representatives, 17 construction ergonomics researchers from government and academia, and four ergonomics consultants with experience in the construction industry. Participants spent more than 50% of time meeting in small trade-specific breakout sessions. According to the participants, tasks common to the three trades included (1) drill holes and shoot fasteners; (2) place and install systems, and (3) lift and carry materials and equipment. Engineering interventions described in the stakeholder meeting included tools, equipment, and engineered building materials; administrative controls largely consisted of training and education programs and modifications of work and management practice. Most participants believed that there were significant limits to the impact individual contractors and tradespeople could have in leading ergonomics improvement in the building and construction industry.

  20. The History of Orbiter Corrosion Control (1981 - 2011)

    NASA Technical Reports Server (NTRS)

    Russell, Richard W.

    2014-01-01

    After 135 missions and 30 years the Orbiter fleet was retired in 2011. Working with Orbiter project management and a world class engineering team the CCRB was successful in providing successful sustaining engineering support for approximately 20 years. Lessons learned from the Orbiter program have aided NASA and contractor engineers in the design and manufacture of new spacecraft so that exploration of space can continue. The Orbiters are proudly being displayed for all the public to see in New York City, Washington D.C., Los Angeles, and at the Kennedy Space Center in Florida.

  1. Space Station logistics policy - Risk management from the top down

    NASA Technical Reports Server (NTRS)

    Paules, Granville; Graham, James L., Jr.

    1990-01-01

    Considerations are presented in the area of risk management specifically relating to logistics and system supportability. These considerations form a basis for confident application of concurrent engineering principles to a development program, aiming at simultaneous consideration of support and logistics requirements within the engineering process as the system concept and designs develop. It is shown that, by applying such a process, the chances of minimizing program logistics and supportability risk in the long term can be improved. The problem of analyzing and minimizing integrated logistics risk for the Space Station Freedom Program is discussed.

  2. International Air and Trade Shows: DoD Increased Participation, but its Policies Are Not Well-Defined

    DTIC Science & Technology

    1993-03-01

    and Singapore shows, was to pay all personnel, maintenance, logistic, and transportation costs. Recent Legislation Cection 1082 of the National Defense...In addition, the policy on leases to contractors probably will need to be more specifically defined because section 1082 only addresses recovering...Recommendation We recommend that the Secretary of Defense, in implementing Section 1082 of the National Defense Authorization Act for Fiscal Year 1993, issue

  3. Logistics and Strategy

    DTIC Science & Technology

    2014-12-04

    noncombat arms functions. They consolidated all support activities, e.g. signal, engineering , etc., under logistics. This implied a robust organization that...facilities stateside, the Corps of Engineers constructed new airfields and bases overseas in countries such as Australia and North Africa, which...Heritage Command (Washington, DC: Washington Navy Yard, 2013). 52 Hugh J. Casey, Organization, Soldiers, and Training. Engineers of the Southwest

  4. Construction Management.

    ERIC Educational Resources Information Center

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  5. 48 CFR 2936.604 - Performance evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...

  6. 48 CFR 2936.604 - Performance evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...

  7. 48 CFR 2936.604 - Performance evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...

  8. 48 CFR 2936.604 - Performance evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...

  9. 48 CFR 2936.604 - Performance evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...

  10. 48 CFR 1845.7101-2 - Transfers of property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... items are recorded (including Federal Supply Classification group (FSC) codes for equipment), unit... appropriate such as manufacturing or engineering records used for work control and billing purposes. Shipping... from another contractor that is identified on the shipping document as equipment, but that the...

  11. 23 CFR 646.103 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application. 646.103 Section 646.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Insurance Protection § 646.103 Application. (a) This part applies: (1) To a contractors' legal...

  12. Geophysical Survey of McMurdo Ice Shelf to Determine Infrastructure Stability and for Future Planning

    DTIC Science & Technology

    2017-01-01

    ER D C/ CR RE L TR -1 7- 2 Engineering for Polar Operations, Logistics, and Research (EPOLAR) Geophysical Survey of McMurdo Ice Shelf...Army Engineer Research and Development Center (ERDC) solves the nation’s toughest engineering and environmental challenges. ERDC develops...ERDC, visit the ERDC online library at http://acwc.sdp.sirsi.net/client/default. Engineering for Polar Operations, Logistics, and Research (EPOLAR

  13. The Shuttle processing contractors (SPC) reliability program at the Kennedy Space Center - The real world

    NASA Astrophysics Data System (ADS)

    McCrea, Terry

    The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.

  14. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

    NASA Technical Reports Server (NTRS)

    Dorman, Lane

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

  15. Sharing lessons learned and best practices in deactivation and decommissioning techniques among U.S. Department of Energy contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lackey, Michael B.; Waisley, Sandra L.; Dusek, Lansing G.

    2007-07-01

    Approximately $153.2 billion of work currently remains in the United States Department of Energy's (DOE's) Office of Environmental Management (EM) life cycle budget for United States projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and develop a knowledge management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. At the request of the DOE's EM Office of Engineering and Technology, the Energy Facility Contractors Group (EFCOG) responded to the challenge with formation of the Deactivation and Decommissioning (D and D) and Facilitymore » Engineering (DD/FE) Working Group. Since October 2006, members have already made significant progress in realizing their goals: adding new D and D best practices to the existing EFCOG Best Practices database; participating in lessons learned forums; and contributing to a DOE initiative on identifying technology needs. The group is also participating in a DOE project management initiative to develop implementation guidelines, as well as a DOE radiation protection initiative to institute a more predictable and standardized approach to approving authorized limits and independently verifying cleanup completion at EM sites. Finally, a D and D hotline to provide real-time solutions to D and D challenges is also being launched. (authors)« less

  16. Engineering Documentation and Data Control

    NASA Technical Reports Server (NTRS)

    Matteson, Michael J.; Bramley, Craig; Ciaruffoli, Veronica

    2001-01-01

    Mississippi Space Services (MSS) the facility services contractor for NASA's John C. Stennis Space Center (SSC), is utilizing technology to improve engineering documentation and data control. Two identified improvement areas, labor intensive documentation research and outdated drafting standards, were targeted as top priority. MSS selected AutoManager(R) WorkFlow from Cyco software to manage engineering documentation. The software is currently installed on over 150 desctops. The outdated SSC drafting standard was written for pre-CADD drafting methods, in other words, board drafting. Implementation of COTS software solutions to manage engineering documentation and update the drafting standard resulted in significant increases in productivity by reducing the time spent searching for documents.

  17. On the X-34 FASTRAC-Memorandums of Misunderstanding

    NASA Technical Reports Server (NTRS)

    Hawkins, Lakiesha V.; Turner, Jim E.

    2015-01-01

    Engineers at MSFC designed, developed, and tested propulsion systems that helped launch Saturn I, IB, and V boosters for the Apollo missions. After the Apollo program, Marshall was responsible for the design and development of the propulsion elements for the Shuttle launch vehicle, including the solid rocket boosters, external tank and main engines. Each of these systems offered new propulsion technological challenges that pushed engineers and administrators beyond Saturn. The technical challenges presented by the development of each of these propulsion systems helped to establish and sustain a culture of engineering conservatism and was often accompanied by a deep level of penetration into contractors that worked on these systems.

  18. Proceedings of the Department of Energy ALARA Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Baum, J.W.

    1992-12-31

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.« less

  19. Logistics engineering education from the point of view environment

    NASA Astrophysics Data System (ADS)

    Bányai, Ágota

    2010-05-01

    A new field of MSc programme offered by the Faculty of Mechanical Engineering and Informatics of the University of Miskolc is represented by the programme in logistics engineering. The Faculty has always laid great emphasis on assigning processes connected with environment protection and globalisation issues the appropriate weight in its programmes. This is based on the fact that the Faculty has initiated and been involved in a great number of research and development projects with a substantial emphasis on the fundamental principles of sustainable development. The objective of the programme of logistics engineering is to train engineers who, in possession of the science, engineering, economic, informatics and industrial, transportation technological knowledge related to the professional field of logistics, are able to analyse, design, organise, and control logistics processes and systems (freight transportation, materials handling, storage, commissioning, loading, purchasing, distribution and waste management) as well as to design and develop machinery and equipment as the elements of logistic systems and also to be involved in their manufacture and quality control and are able to control their operation. The programme prepares its students for performing the logistics management tasks in a company, for creative participation in solving research and development problems in logistics and for pursuing logistics studies in doctoral programmes. There are several laboratories available for practice-oriented training. The 'Integrated Logistics Laboratory' consists of various fixed and mobile, real industrial, i.e. not model-level equipment, the integration of which in one system facilitates not only the presentation, examination and development of the individual self-standing facilities, but the study of their interaction as well in terms of mechatronics, engineering, control engineering, informatics, identification technology and logistics. The state-of-the-art, reliable, automated mechatronics-material flow system with its single control engineering system provides the academic staff with up-to-date research facilities, and enables the students to study sophisticated equipment and systems that could also operate under industrial conditions, thus offering knowledge that can be efficiently utilised in the industry after graduation. The laboratory measurements of the programme in logistics engineering are performed in this laboratory, and they are supplemented by the theoretical and practical measurements in the ‘Robotic Technology Assembly Laboratory', the ‘Power Electronics Laboratory', the ‘Mechatronics Laboratory', the ‘CAD/CAM Laboratory' and the ‘Acoustics and Product Laboratory'. The bodies of knowledge connected with environment protection and sustainable development can be grouped around three large topic areas. In environmental economics the objective is to present the corporate-organisational aspects of environmental management. Putting environmental management in the focal point, the objective of the programme is to impart knowledge that can be utilised in practice which can be used to shift the relation between the organisation and its environment in the direction of sustainability. The tools include environmental controlling, environmental marketing and various solutions of environmental performance evaluation. The second large topic area is globalization and its logistic aspects. In the field of global logistics the following knowledge carries special weight: logistic challenges in a globalised world; the concept of global logistics, its conditions and effects; delayed manufacture, assembly, packaging; the economic investigation of delayed assembly; globalised purchase and distribution in logistics; the logistic features of the globalised production supply/distribution chain; meta-logistics systems; logistics-related EU harmonisation issues; the effect of e-commerce on the global logistic system; logistic centres, connecting virtual logistic companies in a network; the environmental harmonisation of international transportation. The third large area is recycling logistics. Here the bodies of knowledge are as follows: the concept of developing a ‘closed-loop economy'; stages in the progress of products after discarding, connections between the uses of waste collection, processing, selection, deposition or reuse processes; features of European recommendations (e.g. EMAS), harmonisation of national practices and global solutions; presenting the logistics part-processes of recycling; presenting process organisation procedures for the foundation of designing one-route, multi-route, replacement container waste collecting and distributing part systems; recycling strategies with consideration of logistically serving the separation and storage of waste to be deposited, the technological processing systems of recyclable materials; presenting dismantling and product and material identification technologies, presenting logistics part-tasks, analysis of technical solutions; IT solutions for identifying products and their elements to be distributed and withdrawn from distribution after use (e.g. RFID systems) and monitoring their material flow; methodology of using efficiency analyses and incentive systems in the decision making processes of recycling processes, risk analysis for evaluating typical part processes; the methodology of recycling-oriented product design for specific product groups. Graduates of the Master programmes are able to use and utilise the knowledge obtained in practice, use problem-solving techniques; process the information, new problems and new phenomena arising in the border areas of the professional experience gained the discipline; formulate substantial criticism and opinions as far as possible, make decisions and draw conclusions; comprehending and solving the problems arising, suggesting original ideas; plan and perform tasks independently at a high professional standard; improve themselves, develop their knowledge to higher levels; view the management of technical/engineering - economic - human resources in a complex way; design complex systems in a global way based on a system-oriented and process-oriented way of thinking; use integrated knowledge from the professional fields of transport, mobile machinery, process theory, industrial production processes, electronics and informatics; combine the part processes of logistics systems and the part units performing their physical realisation (materials handling equipment, sensors, actuators, control systems, and database systems, etc.); perform state evaluations depending on their specialisation, use them to elaborate evaluations and recommendations, develop complex logistic systems, design, organise and control them at the highest level. This work was implemented with support by the European Union and co-funding of the European Social Fund.

  20. Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.

  1. 46 CFR 57.02-4 - Fabricator's responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING... manufacturer or contractor is responsible for the welding and brazing done by his organization and shall conduct tests required in this part to qualify the welding and brazing procedures used and the performance...

  2. Analysis of change orders in geotechnical engineering work at INDOT.

    DOT National Transportation Integrated Search

    2011-01-01

    Change orders represent a cost to the State and to tax payers that is real and often extremely large because contractors tend to charge very large : amounts to any additional work that deviates from the work that was originally planned. Therefore, ef...

  3. Is That Boiler Ready To Blow?

    ERIC Educational Resources Information Center

    Robinson, Glenn S.; Trombley, Robert E.

    2001-01-01

    Discusses implementation of a thorough assessment program to determine the condition of boilers, pressure vessels and other plant equipment to determine the feasibility of part or entire system replacement. Assessment basics are examined as are tips for selecting the right inspection and engineering contractor for assessments. (GR)

  4. 46 CFR 57.02-4 - Fabricator's responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING... manufacturer or contractor is responsible for the welding and brazing done by his organization and shall conduct tests required in this part to qualify the welding and brazing procedures used and the performance...

  5. 46 CFR 57.02-4 - Fabricator's responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING... manufacturer or contractor is responsible for the welding and brazing done by his organization and shall conduct tests required in this part to qualify the welding and brazing procedures used and the performance...

  6. 46 CFR 57.02-4 - Fabricator's responsibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING... manufacturer or contractor is responsible for the welding and brazing done by his organization and shall conduct tests required in this part to qualify the welding and brazing procedures used and the performance...

  7. 46 CFR 57.02-4 - Fabricator's responsibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING WELDING AND BRAZING... manufacturer or contractor is responsible for the welding and brazing done by his organization and shall conduct tests required in this part to qualify the welding and brazing procedures used and the performance...

  8. Architectural Drafting. Curriculum Development. Bulletin 1779.

    ERIC Educational Resources Information Center

    Eppler, Thomas

    This teaching guide is designed to aid high school vocational education teachers in teaching a course in architectural drafting for students who plan to become architects, interior designers and decorators, architectural draftspersons, landscape engineers, building contractors, building estimators, real estate persons or appraisers, and others.…

  9. DoD Needs to Improve Oversight of the Afghan National Police Training/Mentoring and Logistics Support Contract

    DTIC Science & Technology

    2013-06-25

    test Waste Water Treatment Plant” because no testing kit was onsite. The COR additionally stated he identified failed equipment and the contractor...Officer ( PCO ) confirmed with the previous ACC-Rl PCO and neither recall ever making this statement. The previous PCO recalls discussing that a QASP...performance surveillance and have access to all contract documents. Adequate contract oversight is always a concern of the PCO , in part due to the

  10. Joint Task Force - Port Opening: Can this Emerging Capability Expedite Operational Objectives Throughout the Range of Military Operations?

    DTIC Science & Technology

    2009-10-26

    for Acquisition, Technology, and Logistics, 30 July 2007). 16 Craig Koontz , ―U.S. Transportation Command,‖ PowerPoint, 23 September 2009, Newport, RI...Support Group. To Lt Col Michael W. Pratt, Naval War College. Memorandum, 30 September 2009. Koontz , Craig. ―U.S. Transportation Command...PowerPoint. 23 September 2009. 22 Koontz , Craig. Contractor/Advisor to CDR U.S. Transportation Command. To Lt Col Michael W. Pratt, 28

  11. Compilation of Abstracts of Dissertations, Theses, and Research Papers Submitted by Candidates for Degrees

    DTIC Science & Technology

    1978-11-01

    restricted Line Officer Financial Management Subspecialists Van Haaren, C. G., The AGOR-21 Class Oceanographic 78 LCDR, Supply Research Ships: An...Layer into a Fast Bottom Shields, R. B., Jr., Signal Enhance of Specularly 39 LT, USN Scattered Underwater Sound I MANAGEMENT - Apap, A., CDR, USN Total...Contractor Logistics 40-2 Support: A New Concept in Naval Aviation Beran, R. D, Naval Acquisition Management of 41 Weapons Center, Peculiar Ground

  12. Air Force Logistics Command DCS/Materiel Management 1988-9 Master Plan

    DTIC Science & Technology

    1988-10-01

    MMMAI, AUTOVON 787-2587 Member: Mr James Gibbs, HQ AFLC/MMMES, AUTOVON 787-3407 PROJECT SPONSOR: Mr Steve Stewart, HQ AFLC/MMME, AUTOVON 787-5280 HQ...AFLC OPR: Mr James Gibbs, HQ AFLC/MMMES, AUTOVON 787-3407 PROBLEM STATEMENT: Item managers do not have a procedure to analyze the economic costs and/or...513) 429-0055 Contractor: The Analytic Sciences Corporation (Contact) Mr Rich Mabe , (513) 426-1040 PROJECT SPONSOR: Lt Col Michael Williams, HQ USAF

  13. Defense Logistical Support Contracts in Iraq and Afghanistan: Issues for Congress

    DTIC Science & Technology

    2009-06-24

    on Wartime Contracting in Iraq and Afghanistan; • Section 852 calls for the Army Audit Agency, the Navy Audit Services, and the Air Force Audit...reporting requirements for contractors that perform security functions in areas of combat operations and are involved in the discharge of a weapon or other...hand in dealing with industry. As an example, Secretary of the Navy Donald C. Winter and Chief of Naval Operations Adm. Michael G. Mullen have reported

  14. 48 CFR 970.5215-4 - Cost reduction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost reduction. 970.5215-4 Section 970.5215-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Development cost is the Contractor cost of up-front planning, engineering, prototyping, and testing of a...

  15. 48 CFR 48.101 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... should not in itself increase costs to the Government. (2) The second approach is a mandatory program in... savings or (2) be required to establish a program to identify and submit to the Government methods for... two value engineering approaches: (1) The first is an incentive approach in which contractor...

  16. Schools Enlisting Defense Industry to Boost STEM

    ERIC Educational Resources Information Center

    Trotter, Andrew

    2008-01-01

    Defense contractors Northrop Grumman Corp. and Lockheed Martin Corp. are joining forces in an innovative partnership to develop high-tech simulations to boost STEM--or science, technology, engineering, and mathematics--education in the Baltimore County schools. The Baltimore County partnership includes the local operations of two major military…

  17. Automotive Energy Efficiency Program - Papers Presented at the Automobile Engine Control Symposium, July 8 and 9, 1975

    DOT National Transportation Integrated Search

    1976-07-01

    This volume contains working papers presented at the Contractors Coordination Meeting of the Automotive Energy Efficiency Program held at the DOT Transportation Systems Center, July 8 and 9, 1975. This program is the Federal Government's major effort...

  18. KSC-00pp0503

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (left) dons protective apron, gloves and face shield before the "ribbon-breaking" to open the new Cryogenic Testbed Facility. Part of the normal ceremonial ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  19. KSC-00pp0504

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (left), wearing protective apron, gloves and face shield, watches as liquid nitrogen is poured into a container to freeze the plastic tubing for a special "ribbon-breaking" to open the new Cryogenic Testbed Facility. Bridges hit the section of tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  20. KSC-00pp0505

    NASA Image and Video Library

    2000-04-14

    A shower of frozen plastic signifies the successful breaking of the ceremonial "ribbon" at the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  1. KSC-00pp0506

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (center) is congratulated for the successful breaking of the ceremonial "ribbon" and the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  2. Teamed for Success: The Imperative for Aligning Systems Engineering and Life Cycle Logistics

    DTIC Science & Technology

    2013-02-01

    January-February 2013 Kobren is director of the DAU Logistics & Sustainment Center, and the DoD Product Support Assessment Human Capital IPT lead...engineering colleagues, here are 10 key life-cycle logistics, product support, and system sustainment tenets to be cognizant of: Decisions You Make Will...and updates to the Life Cycle Sustainment Plan (LCSP). A vast majority of a weapon systems’ total ownership costs are determined by decisions made

  3. Software Engineering for Human Spaceflight

    NASA Technical Reports Server (NTRS)

    Fredrickson, Steven E.

    2014-01-01

    The Spacecraft Software Engineering Branch of NASA Johnson Space Center (JSC) provides world-class products, leadership, and technical expertise in software engineering, processes, technology, and systems management for human spaceflight. The branch contributes to major NASA programs (e.g. ISS, MPCV/Orion) with in-house software development and prime contractor oversight, and maintains the JSC Engineering Directorate CMMI rating for flight software development. Software engineering teams work with hardware developers, mission planners, and system operators to integrate flight vehicles, habitats, robotics, and other spacecraft elements. They seek to infuse automation and autonomy into missions, and apply new technologies to flight processor and computational architectures. This presentation will provide an overview of key software-related projects, software methodologies and tools, and technology pursuits of interest to the JSC Spacecraft Software Engineering Branch.

  4. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  5. Aero-acoustic performance comparison of core engine noise suppressors on NASA quiet engine C

    NASA Technical Reports Server (NTRS)

    Bloomer, H. E.; Schaefer, J. W.

    1977-01-01

    The relative aero-acoustic effectiveness of two core engine suppressors, a contractor-designed suppressor delivered with the Quiet Engine, and a NASA-designed suppressor was evaluated. The NASA suppressor was tested with and without a splitter making a total of three configurations being reported in addition to the baseline hardwall case. The aerodynamic results are presented in terms of tailpipe pressure loss, corrected net thrust, and corrected specific fuel consumption as functions of engine power setting. The acoustic results are divided into duct and far-field acoustic data. The NASA-designed core suppressor did the better job of suppressing aft end noise, but the splitter associated with it caused a significant engine performance penality. The NASA core suppressor without the spltter suppressed most of the core noise without any engine performance penalty.

  6. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  7. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  8. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  9. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  10. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  11. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  12. 48 CFR 36.609-1 - Design within funding limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Design within funding... Services 36.609-1 Design within funding limitations. (a) The Government may require the architect-engineer contractor to design the project so that construction costs will not exceed a contractually specified dollar...

  13. Collaborative Research and Development (CR&D) III Task Order 0077: Fundamental Studies of Plasticity, Interfacial Boundaries and Liquid Metals

    DTIC Science & Technology

    2013-06-01

    Interfacial Boundaries and Liquid Metals Dallas Trinkle Independent Contractor JUNE 2013 Final Report Approved for public...SIGNATURE//_________________ CHRISTOPHER WOODWARD, Project Engineer DANIEL EVANS, Chief Metals Branch Metals Branch Structural ...Materials Division Structural Materials Division ____//SIGNATURE//___________________ ROBERT T. MARSHALL, Deputy Chief

  14. A Principal's Guide to On-Site School Construction

    ERIC Educational Resources Information Center

    Brenner, William A.

    2009-01-01

    This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…

  15. ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO TOP: MTR, MTR SERVICE BUILDING, ETR CRITICAL FACILITY, ETR CONTROL BUILDING (ATTACHED TO ETR), ETR BUILDING (HIGH-BAY), COMPRESSOR BUILDING (ATTACHED AT LEFT OF ETR), HEAT EXCHANGER BUILDING (JUST BEYOND COMPRESSOR BUILDING), COOLING TOWER PUMP HOUSE, COOLING TOWER. OTHER BUILDINGS ARE CONTRACTORS' CONSTRUCTION BUILDINGS. INL NEGATIVE NO. 56-4105. Unknown Photographer, ca. 1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  16. Idaho National Engineering Laboratory Waste Management Operations Roadmap Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bullock, M.

    1992-04-01

    At the direction of the Department of Energy-Headquarters (DOE-HQ), the DOE Idaho Field Office (DOE-ID) is developing roadmaps for Environmental Restoration and Waste Management (ER&WM) activities at Idaho National Engineering Laboratory (INEL). DOE-ID has convened a select group of contractor personnel from EG&G Idaho, Inc. to assist DOE-ID personnel with the roadmapping project. This document is a report on the initial stages of the first phase of the INEL`s roadmapping efforts.

  17. Comparison of NASA and contractor results from aeroacoustic tests of QCSEE OTW engine

    NASA Technical Reports Server (NTRS)

    Bloomer, H. E.; Loeffler, I. J.; Kreim, W. J.; Coats, J. W.

    1981-01-01

    The aerodynamics and acoustics of the over-the-wing (OTW) Quiet, Clean, Short Haul Experimental Engine (QCSEE) were tested. A boilerplate (nonflight weight), high-throat Mach number, acoustically treated inlet and a D-shaped OTW exhaust nozzle with variable position side doors were used. Some acoustic directivity results for the type "D" nozzle and acoustic effects of variations in the nozzle side door positions are included. It was found that the results are in agreement with those previously obtained.

  18. Saturn Apollo Program

    NASA Image and Video Library

    1967-11-01

    This image depicts a Boeing worker installing an F-1 engine on the Saturn V S-IC flight stage at the Michoud Assembly Facility (MAF). The Saturn IB and Saturn V first stages were manufactured at the MAF, located 24 kilometers (approximately 15 miles) east of downtown New Orleans, Louisiana. The prime contractors, Chrysler and Boeing, jointly occupied the MAF. The basic manufacturing building boasted 43 acres under one roof. By 1964, NASA added a separate engineering and office building, vertical assembly building, and test stage building.

  19. Development of an Ada programming support environment database SEAD (Software Engineering and Ada Database) administration manual

    NASA Technical Reports Server (NTRS)

    Liaw, Morris; Evesson, Donna

    1988-01-01

    Software Engineering and Ada Database (SEAD) was developed to provide an information resource to NASA and NASA contractors with respect to Ada-based resources and activities which are available or underway either in NASA or elsewhere in the worldwide Ada community. The sharing of such information will reduce duplication of effort while improving quality in the development of future software systems. SEAD data is organized into five major areas: information regarding education and training resources which are relevant to the life cycle of Ada-based software engineering projects such as those in the Space Station program; research publications relevant to NASA projects such as the Space Station Program and conferences relating to Ada technology; the latest progress reports on Ada projects completed or in progress both within NASA and throughout the free world; Ada compilers and other commercial products that support Ada software development; and reusable Ada components generated both within NASA and from elsewhere in the free world. This classified listing of reusable components shall include descriptions of tools, libraries, and other components of interest to NASA. Sources for the data include technical newletters and periodicals, conference proceedings, the Ada Information Clearinghouse, product vendors, and project sponsors and contractors.

  20. Space Shuttle Main Engine Joint Data List Applying Today's Desktop Technologies to Facilitate Engine Processing

    NASA Technical Reports Server (NTRS)

    Jacobs, Kenneth; Drobnick, John; Krell, Don; Neuhart, Terry; McCool, A. (Technical Monitor)

    2001-01-01

    Boeing-Rocketdyne's Space Shuttle Main Engine (SSME) is the world's first large reusable liquid rocket engine. The space shuttle propulsion system has three SSMEs, each weighing 7,400 lbs and providing 470,000 lbs of thrust at 100% rated power level. To ensure required safety and reliability levels are achieved with the reusable engines, each SSME is partially disassembled, inspected, reassembled, and retested at Kennedy Space Center between each flight. Maintenance processing must be performed very carefully to replace any suspect components, maintain proper engine configuration, and avoid introduction of contaminants that could affect performance and safety. The long service life, and number, complexity, and pedigree of SSME components makes logistics functions extremely critical. One SSME logistics challenge is documenting the assembly and disassembly of the complex joint configurations. This data (joint nomenclature, seal and fastener identification and orientation, assembly sequence, fastener torques, etc.) must be available to technicians and engineers during processing. Various assembly drawings and procedures contain this information, but in this format the required (practical) joint data can be hard to find, due to the continued use of archaic engineering drawings and microfilm for field site use. Additionally, the release system must traverse 2,500 miles between design center and field site, across three time zones, which adds communication challenges and time lags for critical engine configuration data. To aid in information accessibility, a Joint Data List (JDL) was developed that allows efficient access to practical joint data. The published JDL has been a very useful logistics product, providing illustrations and information on the latest SSME configuration. The JDL identifies over 3,350 unique parts across seven fluid systems, over 300 joints, times two distinct engine configurations. The JDL system was recently converted to a web-based, navigable electronic manual that contains all the required data and illustrations in expanded view format using standard PC products (Word, Excel, PDF, Photoshop). The logistics of accurately releasing this information to field personnel was greatly enhanced via the utilization of common office products to produce a more user-friendly format than was originally developed under contract to NASA. This was done without reinventing the system, which would be cost prohibitive on a program of this maturity. The brunt of the joint part tracking is done within the logistics organization and disseminated to all field sites, without duplicating effort at each site. The JDL is easily accessible across the country via the NASA intranet directly at the SSME workstand. The advent of this logistics data product has greatly enhanced the reliability of tracking dynamic changes to the SSME and greatly reduces engineering change turnaround time and potential for errors. Since the inception of the JDL system in 1997, no discrepant parts have propagated to engine assembly operations. This presentation focuses on the challenges overcome and the techniques used to apply today's desktop technologies to an existing logistics data source.

  1. Development of LM10-MIRA LOX/LNG expander cycle demonstrator engine

    NASA Astrophysics Data System (ADS)

    Rudnykh, Mikhail; Carapellese, Stefano; Liuzzi, Daniele; Arione, Luigi; Caggiano, Giuseppe; Bellomi, Paolo; D'Aversa, Emanuela; Pellegrini, Rocco; Lobov, S. D.; Gurtovoy, A. A.; Rachuk, V. S.

    2016-09-01

    This article contains results of joint works by Konstruktorskoe Buro Khimavtomatiki (KBKhA, Russia) and AVIO Company (Italy) on creation of the LM10-MIRA liquid-propellant rocket demonstrator engine for the third stage of the upgraded "Vega" launcher.Scientific and research activities conducted by KBKhA and AVIO in 2007-2014 in the frame of the LYRA Program, funded by the Italian Space Agency, with ELV as Prime contractor, and under dedicated ASI-Roscosmos inter-agencies agreement, were aimed at development and testing of a 7.5 t thrust expander cycle demonstrator engine propelled by oxygen and liquid natural gas (further referred to as LNG).

  2. Nuclear Physics Made Very, Very Easy

    NASA Technical Reports Server (NTRS)

    Hanlen, D. F.; Morse, W. J.

    1968-01-01

    The fundamental approach to nuclear physics was prepared to introduce basic reactor principles to various groups of non-nuclear technical personnel associated with NERVA Test Operations. NERVA Test Operations functions as the field test group for the Nuclear Rocket Engine Program. Nuclear Engine for Rocket Vehicle Application (NERVA) program is the combined efforts of Aerojet-General Corporation as prime contractor, and Westinghouse Astronuclear Laboratory as the major subcontractor, for the assembly and testing of nuclear rocket engines. Development of the NERVA Program is under the direction of the Space Nuclear Propulsion Office, a joint agency of the U.S. Atomic Energy Commission and the National Aeronautics and Space Administration.

  3. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1977.

    DTIC Science & Technology

    1977-01-01

    ENGINEERING INC * 2 e GENERAL i:tT~ LU l4 e DEWEEY ELECI-ONICS CORP It 160 E GENERAL I % 5TkUM E’t: 61.mP 9 43 DIGITAL CCt.MUNICATIONS C3O* 49 8...NORTHROP CORP • 63 h RANE CORP -- , 424 N NORTHWESTERN UNIVERSITY 4 .27 E RAYCLPN INOUSTKIES INC 383 8 OCEAN DATA SYSTEMS INC • 481 8 RAYPhNO ENGINEERING ...CONTROL INC . 344 h VIRGLNIA UNIVEkSITY (.;F 268 a SYSTEMS ENGINE -ING LAdORATONIES * 366 e VISIDYNE INC 26? 8 SYSTEMS EXPLOQATICN INC * 62 e VOUGHT CORP

  4. Aero-acoustic performance comparison of core engine noise suppressors on NASA quiet engine 'C'

    NASA Technical Reports Server (NTRS)

    Bloomer, H. E.; Schaefer, J. W.

    1977-01-01

    The purpose of the experimental program reported herein was to evaluate and compare the relative aero-acoustic effectiveness of two core engine suppressors, a contractor-designed suppressor delivered with the Quiet Engine, and a NASA-designed suppressor, designed and built subsequently. The NASA suppressor was tested with and without a splitter making a total of three configurations being reported in addition to the baseline hardwall case. The aerodynamic results are presented in terms of tailpipe pressure loss, corrected net thrust, and corrected specific fuel consumption as functions of engine power setting. The acoustic results are divided into duct and far-field acoustic data. The NASA-designed core suppressor did the better job of suppressing aft end noise, but the splitter associated with it caused a significant engine performance penalty. The NASA core suppressor without the splitter suppressed most of the core noise without any engine performance penalty.

  5. FY 1991 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1991-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 1991 are presented. Papers of MSFC contractors are also included. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  6. The Management of Building Environment for Comfort and Energy Conservation. Final Report.

    ERIC Educational Resources Information Center

    North Seattle Community Coll., WA.

    This report presents materials from a Washington State project to develop a curriculum outline of three courses for energy conservation to be used in vocational supplement classes. It first presents results from an industrial survey on which engineers, architects, and mechanical contractors rated objectives for the three courses. Next are provided…

  7. 29 CFR 4.188 - Ineligibility for further contracts when violations occur.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., relief from debarment cannot be in order where a contractor has a history of similar violations, where a... nature. (ii) A good compliance history, cooperation in the investigation, repayment of moneys due, and... & Cleaning Engineers, Inc., Decision of the Secretary, SCA 176, September 27, 1974; Ernest Roman, Decision of...

  8. 29 CFR 4.188 - Ineligibility for further contracts when violations occur.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., relief from debarment cannot be in order where a contractor has a history of similar violations, where a... nature. (ii) A good compliance history, cooperation in the investigation, repayment of moneys due, and... & Cleaning Engineers, Inc., Decision of the Secretary, SCA 176, September 27, 1974; Ernest Roman, Decision of...

  9. 29 CFR 4.188 - Ineligibility for further contracts when violations occur.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., relief from debarment cannot be in order where a contractor has a history of similar violations, where a... nature. (ii) A good compliance history, cooperation in the investigation, repayment of moneys due, and... & Cleaning Engineers, Inc., Decision of the Secretary, SCA 176, September 27, 1974; Ernest Roman, Decision of...

  10. Power metallurgy approaches to high temperature components for gas turbine engines

    NASA Technical Reports Server (NTRS)

    Probst, H. B.

    1974-01-01

    Work conducted by NASA and NASA contractors on prealloyed superalloy powders and materials strengthened by oxide dispersion is reviewed. Fabrication, tensile strength, superplasticity, grain growth control, stress rupture life, and grain-size and dispersion-level effects are covered. Distinct strength advantages of powder metallurgy superalloys over conventional wrought alloys are noted.

  11. Analysis of 4D Modeling for Use by the Naval Facilities Engineering Command

    DTIC Science & Technology

    2004-08-01

    Use Today Today, 4D modeling is being used to build Space Mountain at the new Hong Kong Disneyland theme park. Additionally, the technology is being...used for the reconstruction of the 26-year-old Space Mountain at the Disneyland in Anaheim. Muller explains: Among the hassles: Contractors must

  12. Pursuing the Delta -- Maximizing Opportunities to Integrate Sustainability in the Funding Processes

    DTIC Science & Technology

    2011-03-03

    that may contain safety and health hazards. This is not an all-inclusive list: a. Fire protection issues b. Toxic fumes (i.e., engine exhaust...hazards shall be reported as part of the SAR. A.6 Hazardous Materials. The contractor shall not use cadmium, hexavalent chromium , or other

  13. 77 FR 58382 - Designation of a Class of Employees for Addition to the Special Exposure Cohort

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Special Exposure Cohort AGENCY: National Institute for Occupational Safety and Health (NIOSH), Centers for... predecessor agencies, and their contractors and subcontractors who worked at the Hanford Engineer Works in... at least 250 work days, occurring either solely under this employment or in combination with work...

  14. 78 FR 33839 - Access by United States Environmental Protection Agency (EPA) Contractors to Information Claimed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... health and the environment by regulating air pollution from motor vehicles, engines, and the fuels used... (CBI) Submitted under Clean Air Act (CAA), Title I, Programs and Activities Air, and Title II Emission Standards for Moving Sources, and Act To Prevent Pollution From Ships (APPS) AGENCY: Environmental...

  15. Concentrating Solar Power Projects - Delingha 50MW Thermal Oil Parabolic

    Science.gov Websites

    Trough project | Concentrating Solar Power | NREL Delingha 50MW Thermal Oil Parabolic Trough project Status Date: April 17, 2017 Project Overview Project Name: Delingha 50MW Thermal Oil Parabolic Contractor: IDOM : Thermal energy storage system engineering Plant Configuration Solar Field # of Loops: 190

  16. Energy Engineering Analysis (EEA) program for Lone Star Army Ammunition Plant, Texas. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army.more » After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.« less

  17. Enabling Logistics With Portable and Wireless Technology Study. Volume 1

    DTIC Science & Technology

    2004-08-06

    Project”, Ubiquitous Computing Group Microsoft Research, 2001. 102 Enabling Logistics with Portable and Wireless Technology Study ...Enabling Logistics with Portable and Wireless Technology Study Final Report FINAL REPORT...Volume I) Enabling Logistics with Portable and Wireless Technology Study AUTHORS School of Industrial Engineering Dr. Soundar Kumara

  18. Logistics Management: Cases Studies,

    DTIC Science & Technology

    LOGISTICS , * MANAGEMENT PLANNING AND CONTROL), DECISION MAKING, INVENTORY CONTROL, SPARE PARTS, AIR FORCE EQUIPMENT, NAVAL AIRCRAFT, MAINTENANCE, DEPLOYMENT, SCHEDULING, SYSTEMS ENGINEERING, TEXTBOOKS

  19. Research and technology 1995 annual report

    NASA Technical Reports Server (NTRS)

    1995-01-01

    As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1995 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as technology transfer activities. Major areas of research include environmental engineering, automation, robotics, advanced software, materials science, life sciences, mechanical engineering, nondestructive evaluation, and industrial engineering.

  20. Apollo experience report: Guidance and control systems. Engineering simulation program

    NASA Technical Reports Server (NTRS)

    Gilbert, D. W.

    1973-01-01

    The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

  1. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  2. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  3. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  4. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  5. Improvement of Selected Logistics Processes Using Quality Engineering Tools

    NASA Astrophysics Data System (ADS)

    Zasadzień, Michał; Žarnovský, Jozef

    2018-03-01

    Increase in the number of orders, the increasing quality requirements and the speed of order preparation require implementation of new solutions and improvement of logistics processes. Any disruption that occurs during execution of an order often leads to customer dissatisfaction, as well as loss of his/her confidence. The article presents a case study of the use of quality engineering methods and tools to improve the e-commerce logistic process. This made it possible to identify and prioritize key issues, identify their causes, and formulate improvement and prevention measures.

  6. Materials Science Laboratory

    NASA Technical Reports Server (NTRS)

    Jackson, Dionne

    2005-01-01

    The NASA Materials Science Laboratory (MSL) provides science and engineering services to NASA and Contractor customers at KSC, including those working for the Space Shuttle. International Space Station. and Launch Services Programs. These services include: (1) Independent/unbiased failure analysis (2) Support to Accident/Mishap Investigation Boards (3) Materials testing and evaluation (4) Materials and Processes (M&P) engineering consultation (5) Metrology (6) Chemical analysis (including ID of unknown materials) (7) Mechanical design and fabrication We provide unique solutions to unusual and urgent problems associated with aerospace flight hardware, ground support equipment and related facilities.

  7. Materials technology assessment for a 1050 K Stirling space engine design

    NASA Technical Reports Server (NTRS)

    Scheuermann, Coulson M.; Dreshfield, Robert L.; Gaydosh, Darrell J.; Kiser, James D.; Mackay, Rebecca A.; Mcdaniels, David L.; Petrasek, Donald W.; Vannucci, Raymond D.; Bowles, Kenneth J.; Watson, Gordon K.

    1988-01-01

    An assessment of materials technology and proposed materials selection was made for the 1050 K (superalloy) Stirling Space Engine design. The objectives of this assessment were to evaluate previously proposed materials selections, evaluate the current state-of-the-art materials, propose potential alternate materials selections and identify research and development efforts needed to provide materials that can meet the stringent system requirements. This assessment generally reaffirmed the choices made by the contractor. However, in many cases alternative choices were described and suggestions for needed materials and fabrication research and development were made.

  8. Marshall Space Flight Center Test Capabilities

    NASA Technical Reports Server (NTRS)

    Hamilton, Jeffrey T.

    2005-01-01

    The Test Laboratory at NASA's Marshall Space Flight Center has over 50 facilities across 400+ acres inside a secure, fenced facility. The entire Center is located inside the boundaries of Redstone Arsenal, a 40,000 acre military reservation. About 150 Government and 250 contractor personnel operate facilities capable of all types of propulsion and structural testing, from small components to engine systems and structural strength, structural dynamic and environmental testing. We have tremendous engineering expertise in research, evaluation, analysis, design and development, and test of space transportation systems, subsystems, and components.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobbs, R.E.

    In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less

  10. A Contingency View of the Strategies of Sustainable Development and Disclosure: Study of ENR's Top 10 Contractors

    NASA Astrophysics Data System (ADS)

    Ho, Shih Ping; Yu, Chong Yang; Hsu, Yaowen

    2017-04-01

    More and more international firms in the A/E/C (Architecture/Engineering/ Construction) industries voluntarily invest in sustainable development and disclose their efforts publicly. Especially, the sustainable development efforts of the firms in Construction industry draw more attentions from the public, compared to that in A/E industries. There are various reporting systems in practice for reporting the performance of a firm's development on sustainability. The most well known reporting systems include Global Reporting Initiative (GRI), United Nations Global Compact (UNGC), and the AA1000 Accountability Principal Standards. However, most of these reporting systems are very complicated in terms of the performance indices and the categories and subcategories of these indices. It is impossible and also unnecessary for a firm to be evaluated on all the indices. However, it is also not clear on what indices are more important for a firm than other indices and why. The more fundamental questions are "what sustainable development efforts contribute more to a particular firm's competitive advantages and why?" In this research, we studied the world's top 10 contractors in ENR (Engineering News Records). We analyzed how these contractors disclose their efforts and performance in sustainable development and, most importantly, why. Lastly, based on the insights obtained from the analysis, we developed a contingency view of sustainable development and disclosure strategies. This strategic framework can be further examined from the perspective of firms' competitive advantages and give implications to how a firm's top managers should implement the firm's sustainable development program.

  11. Definition of propulsion system for V/STOL research and technology aircraft

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Wind tunnel test support, aircraft contractor support, a propulsion system computer card deck, preliminary design studies, and propulsion system development plan are reported. The Propulsion system consists of two lift/cruise turbofan engines, one turboshaft engine and one lift fan connected together with shafting into a combiner gearbox. Distortion parameter levels from 40 x 80 test data were within the established XT701-AD-700 limits. The three engine-three fan system card deck calculates either vertical or conventional flight performance, installed or uninstalled. Design study results for XT701 engine modifications, bevel gear cross shaft location, fixed and tilt fan frames and propulsion system controls are described. Optional water-alcohol injection increased total net thrust 10.3% on a 90 F day. Engines have sufficient turbine life for 500 hours of the RTA duty cycle.

  12. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salvato, S.J. Jr.; Flak, L.H.

    Parts 1 and 2 of this series covered topics of strategy and planning, and logistics. In this article, the important subject of insurance -- what is available, what can be covered and why operators and contractors need to know this -- is discussed. Specific discussions include: (1) role of the adjuster and the mechanics of how you get paid, (2) two basic policy forms, OEE and EED 8/86, now available, and (3) evolution of well control coverage and important definitions. The article concludes with some comments and cautions on what might happen to this coverage in the future.

  14. Contractors on the Battlefield: A Case Study of the Airborne Reconnaissance Low (ARL) Life-Cycle Logistics Support Contract - March 2000 Through August 2001

    DTIC Science & Technology

    2001-12-01

    military vehicles, so they were forced to go to Heidelberg, Germany, to rent Ford Broncos (equivalent to U.S. Ford Explorers). They were also...several of the technicians had family ties to the area. The unit was relocated to El Paso, Texas, in late 1999. Following the relocation, more than...half of the contractor’s personnel resigned. Several were transferred to South Korea. Many individuals did not want to live in the El Paso area, and

  15. FY 1995 Scientific and Technical Reports, Articles, Papers, and Presentations, Volume 1

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1995-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY95. It also includes papers of MSFC contractors. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  16. FY 2002 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2003-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2002. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  17. Expeditionary Diplomacy: A Security Challenge

    DTIC Science & Technology

    2014-07-14

    include special agents, engineers, diplomatic couriers , Civil Service specialists, and contractors-- work together as a team to ensure that the...Directorate ofThreat Investigations and Analysis , 2013) 59 Bibliography Congressional Research Service . Diplomacy for the 21st Centwy: Transformational...enough resources and personnel to mitigate casualties among Foreign Service Officers (FSO) and creating an environment wherein an FSO is no longer able

  18. 77 FR 60437 - Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Addition to the Special Exposure Cohort AGENCY: National Institute for Occupational Safety and Health... predecessor agencies, and their contractors and subcontractors who worked at the Hanford Engineer Works in... at least 250 work days, occurring either solely under this employment or in combination with work...

  19. School Building Projects: Managing Insurance and Contracts during Construction

    ERIC Educational Resources Information Center

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  20. Peer Review of “LDT Weight Reduction Study with Crash Model, Feasibility and Detailed Cost Analyses – Chevrolet Silverado 1500 Pickup”

    EPA Science Inventory

    The contractor will conduct an independent peer review of FEV’s light-duty truck (LDT) mass safety study, “Light-Duty Vehicle Weight Reduction Study with Crash Model, Feasibility and Detailed Cost Analysis – Silverado 1500”, and its corresponding computer-aided engineering (CAE) ...

  1. Damage-Tolerant, Affordable Composite Engine Cases Designed and Fabricated

    NASA Technical Reports Server (NTRS)

    Hopkins, Dale A.; Roberts, Gary D.; Pereira, J. Michael; Bowman, Cheryl L.

    2005-01-01

    An integrated team of NASA personnel, Government contractors, industry partners, and university staff have developed an innovative new technology for commercial fan cases that will substantially influence the safety and efficiency of future turbine engines. This effective team, under the direction of the NASA Glenn Research Center and with the support of the Federal Aviation Administration, has matured a new class of carbon/polymer composites and demonstrated a 30- to 50-percent improvement in specific containment capacity (blade fragment kinetic energy/containment system weight). As the heaviest engine component, the engine case/containment system greatly affects both the safety and efficiency of aircraft engines. The ballistic impact research team has developed unique test facilities and methods for screening numerous candidate material systems to replace the traditional heavy, metallic engine cases. This research has culminated in the selection of a polymer matrix composite reinforced with triaxially braided carbon fibers and technology demonstration through the fabrication of prototype engine cases for three major commercial engine manufacturing companies.

  2. Launch Commit Criteria Monitoring Agent

    NASA Technical Reports Server (NTRS)

    Semmel, Glenn S.; Davis, Steven R.; Leucht, Kurt W.; Rowe, Dan A.; Kelly, Andrew O.; Boeloeni, Ladislau

    2005-01-01

    The Spaceport Processing Systems Branch at NASA Kennedy Space Center has developed and deployed a software agent to monitor the Space Shuttle's ground processing telemetry stream. The application, the Launch Commit Criteria Monitoring Agent, increases situational awareness for system and hardware engineers during Shuttle launch countdown. The agent provides autonomous monitoring of the telemetry stream, automatically alerts system engineers when predefined criteria have been met, identifies limit warnings and violations of launch commit criteria, aids Shuttle engineers through troubleshooting procedures, and provides additional insight to verify appropriate troubleshooting of problems by contractors. The agent has successfully detected launch commit criteria warnings and violations on a simulated playback data stream. Efficiency and safety are improved through increased automation.

  3. Technology transfer in software engineering

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.

    1989-01-01

    The University of Houston-Clear Lake is the prime contractor for the AdaNET Research Project under the direction of NASA Johnson Space Center. AdaNET was established to promote the principles of software engineering to the software development industry. AdaNET will contain not only environments and tools, but also concepts, principles, models, standards, guidelines and practices. Initially, AdaNET will serve clients from the U.S. government and private industry who are working in software development. It will seek new clients from those who have not yet adopted the principles and practices of software engineering. Some of the goals of AdaNET are to become known as an objective, authoritative source of new software engineering information and parts, to provide easy access to information and parts, and to keep abreast of innovations in the field.

  4. ARTIST CONCEPT - APOLLO XI - LUNAR SURFACE

    NASA Image and Video Library

    1969-07-11

    S69-39011 (July 1969) --- TRW Incorporated's artist concept depicting the Apollo 11 Lunar Module (LM) descending to the surface of the moon. Inside the LM will be astronauts Neil A. Armstrong, commander, and Edwin E. Aldrin Jr., lunar module pilot. Astronaut Michael Collins, command module pilot, will remain with the Command and Service Modules (CSM) in lunar orbit. TRW's LM descent engine will brake Apollo 11's descent to the lunar surface. The throttle-able rocket engine will be fired continuously the last 10 miles of the journey to the moon, slowing the LM to a speed of two miles per hour at touchdown. TRW Incorporated designed and built the unique engine at Redondo Beach, California under subcontract to the Grumman Aircraft Engineering Corporation, Bethpage, New York, the LM prime contractor.

  5. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  6. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  7. Technical paper contest for women 1992. Space challenges: Earth and beyond

    NASA Technical Reports Server (NTRS)

    Orans, Robin (Editor)

    1993-01-01

    Two of the major concerns of the NASA Ames Research Center (NASA ARC) Advisory Committee for Women (ACW) are that recruitment of women scientists, engineers, and technicians needs to increase and that barriers to advancement need to be removed for improved representation of women in middle and upper management and scientific positions. One strategy that addressed this concern was the ACW sponsorship of a Technical Paper Contest for Women at Ames Research Center. Other sponsors of the Contest were the Ames Equal Opportunity Council and the Ames Contractor Council. The Technical Paper Contest for Women greatly increased the visibility of both the civil service women and the women who work for contractors at Ames. The women had the opportunity to hone their written and oral presentation skills. Networking among Ames women increased.

  8. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 4 (Washington, D.C.-Lafayette, Indiana).

    DTIC Science & Technology

    1983-01-01

    6 3 J 0000 0 J 1 E 31 DADE AUTO PARTS CECIL FIELD NAS FLORIDA 078626 0585 10 2 K T4O? 0001 NOO612-61-DOT3S B C B 5 2 2 2990 000 A45 MISC ENGINE...INC JACKSONVILLE FLORIDA 002436 1740 10 0 TAIlO 0050 NOSB36-83-DO006 A C C 5 2 2 R399 000 S1 OTHER ADP SERVICES 8 A 4 4 J 018 1 B J I A 81 DE AUTO ...000 C9E BOOKS AND PAMPHLETS 3 6 4 1 J 80 CONTRACTOR TOTAL 3 216 ZIEBART AUTO RUSTPROOFING MI SHAWAK ATLANTA GEORGIA 089890 0290 11 1 I OHA09 0006

  9. Surface contamination analysis technology team overview

    NASA Astrophysics Data System (ADS)

    Burns, H. Dewitt, Jr.

    1996-11-01

    The surface contamination analysis technology (SCAT) team was originated as a working roup of NASA civil service, Space Shuttle contractor, and university groups. Participating members of the SCAT Team have included personnel from NASA Marshall Space Flight Center's Materials and Processes Laboratory and Langley Research Center's Instrument Development Group; contractors-Thiokol Corporation's Inspection Technology Group, AC Engineering support contractor, Aerojet, SAIC, and Lockheed MArtin/Oak Ridge Y-12 support contractor and Shuttle External Tank prime contractor; and the University of Alabama in Huntsville's Center for Robotics and Automation. The goal of the SCAT team as originally defined was to develop and integrate a multi-purpose inspection head for robotic application to in-process inspection of contamination sensitive surfaces. One area of interest was replacement of ozone depleting solvents currently used for surface cleanliness verification. The team approach brought together the appropriate personnel to determine what surface inspection techniques were applicable to multi-program surface cleanliness inspection. Major substrates of interest were chosen to simulate space shuttle critical bonding surface or surfaces sensitive to contamination such as fuel system component surfaces. Inspection techniques evaluated include optically stimulated electron emission or photoelectron emission; Fourier transform infrared spectroscopy; near infrared fiber optic spectroscopy; and, ultraviolet fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992. Instrumentation specifications and designs developed under this effort include a portable diffuse reflectance FTIR system built by Surface Optics Corporation and a third generation optically stimulated electron emission system built by LaRC. This paper will discuss the evaluation of the various techniques on a number of substrate materials contaminated with hydrocarbons, silicones, and fluorocarbons. Discussion will also include standards development for instrument calibration and testing.

  10. An integrative fuzzy Kansei engineering and Kano model for logistics services

    NASA Astrophysics Data System (ADS)

    Hartono, M.; Chuan, T. K.; Prayogo, D. N.; Santoso, A.

    2017-11-01

    Nowadays, customer emotional needs (known as Kansei) in product and especially in services become a major concern. One of the emerging services is the logistics services. In obtaining a global competitive advantage, logistics services should understand and satisfy their customer affective impressions (Kansei). How to capture, model and analyze the customer emotions has been well structured by Kansei Engineering, equipped with Kano model to strengthen its methodology. However, its methodology lacks of the dynamics of customer perception. More specifically, there is a criticism of perceived scores on user preferences, in both perceived service quality and Kansei response, whether they represent an exact numerical value. Thus, this paper is proposed to discuss an approach of fuzzy Kansei in logistics service experiences. A case study in IT-based logistics services involving 100 subjects has been conducted. Its findings including the service gaps accompanied with prioritized improvement initiatives are discussed.

  11. Highly integrated digital electronic control: Digital flight control, aircraft model identification, and adaptive engine control

    NASA Technical Reports Server (NTRS)

    Baer-Riedhart, Jennifer L.; Landy, Robert J.

    1987-01-01

    The highly integrated digital electronic control (HIDEC) program at NASA Ames Research Center, Dryden Flight Research Facility is a multiphase flight research program to quantify the benefits of promising integrated control systems. McDonnell Aircraft Company is the prime contractor, with United Technologies Pratt and Whitney Aircraft, and Lear Siegler Incorporated as major subcontractors. The NASA F-15A testbed aircraft was modified by the HIDEC program by installing a digital electronic flight control system (DEFCS) and replacing the standard F100 (Arab 3) engines with F100 engine model derivative (EMD) engines equipped with digital electronic engine controls (DEEC), and integrating the DEEC's and DEFCS. The modified aircraft provides the capability for testing many integrated control modes involving the flight controls, engine controls, and inlet controls. This paper focuses on the first two phases of the HIDEC program, which are the digital flight control system/aircraft model identification (DEFCS/AMI) phase and the adaptive engine control system (ADECS) phase.

  12. Satellite Data Inform Forecasts of Crop Growth

    NASA Technical Reports Server (NTRS)

    2015-01-01

    During a Stennis Space Center-led program called Ag 20/20, an engineering contractor developed models for using NASA satellite data to predict crop yield. The model was eventually sold to Genscape Inc., based in Louisville, Kentucky, which has commercialized it as LandViewer. Sold under a subscription model, LandViewer software provides predictions of corn production to ethanol plants and grain traders.

  13. Tornado Emergency Readiness Planning for Schools.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Public Instruction, Madison.

    A place of safe refuge in the event of violent natural forces or a tornado should be included in the design of all new school buildings. Existing a school buildings should be analyzed by the architect, contractor, or engineer to determine if a safe place exists or if one can be readily adapted. Most criteria for fallout shelters are the same for…

  14. FY 2005 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Narmore, K. A. (Compiler)

    2007-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2005. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  15. NASA Ares I Crew Launch Vehicle Upper Stage Overview

    NASA Technical Reports Server (NTRS)

    Davusm Daniel J.; McArthur, J. Craig

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system.

  16. NASA Ares I Crew Launch Vehicle Upper State Overview

    NASA Technical Reports Server (NTRS)

    Davis, Daniel J.

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA s Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program s transportation system.

  17. FY 1994 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1994-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center personnel in FY94. It also includes papers of MSFC contractors and author indexes. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  18. U.S. Army Natick Soldier Research, Development & Engineering Center Testing Facilities And Equipment. Second Edition

    DTIC Science & Technology

    2011-04-01

    30 Freeze Dryer ................................................. 30 High-Pressure Processing ............................... 30 Microwave Digestive...PP1 Power Platform Energy Analyzer ..... 41 Quintox Gas Combustion Analyzer .................... 41 FLIR Systems SC2000 Thermacam Handheld IR ...electronically directly to the contractor or printed on plotter paper , oak tag, or on CD. alloy steel, stainless steel, aluminum, copper and copper alloys

  19. 2016 Energy Awareness Day

    NASA Image and Video Library

    2016-10-20

    Cory Taylor, an energy and water conservation specialist at Kennedy Space Center, absorbs information from Mark Gonzalez, a sales engineer with MC2 during Energy Awareness Day at the Multi-Function Facility on Oct. 20. Every third Thursday of October, civil servants, contractors and several energy utilities promote the awareness of our sustainability goals at Kennedy Space Center and at home. Photo credit: Cory Huston

  20. User guide for HCR Estimator 2.0: software to calculate cost and revenue thresholds for harvesting small-diameter ponderosa pine.

    Treesearch

    Dennis R. Becker; Debra Larson; Eini C. Lowell; Robert B. Rummer

    2008-01-01

    The HCR (Harvest Cost-Revenue) Estimator is engineering and financial analysis software used to evaluate stand-level financial thresholds for harvesting small-diameter ponderosa pine (Pinus ponderosa Dougl. ex Laws.) in the Southwest United States. The Windows-based program helps contractors and planners to identify costs associated with tree...

  1. Design and construction of the Discovery Channel Telescope enclosure

    NASA Astrophysics Data System (ADS)

    Marshall, Heather K.; Teran, Jose U.; Bond, Kevin

    2010-07-01

    The Discovery Channel Telescope (DCT) is a project of Lowell Observatory, undertaken with support from Discovery Communications, Inc., to design and construct a 4-meter class telescope and support facility on a site approximately 40 miles southeast of Flagstaff, Arizona. The Discovery Channel Telescope Enclosure was completed in November, 2009. The DCT Enclosure is an octagonal steel structure with insulated composite panel skin. The structure rotates on sixteen compliant bogie assemblies attached to the stationary facility. The shutter is composed of two independently actuated, bi-parting structures that provide a viewing aperture. To improve seeing, the skin is covered with adhesive aluminum foil tape and the enclosed observing area is passively ventilated via rollup doors. The observing area can also be actively ventilated using a downdraft fan, and there are provisions for upgrades to active air conditioning. The enclosure also includes operational equipment such as a bridge crane, personnel lift, and access platforms. This paper discusses some of the design trades as well as the construction challenges and lessons learned by the DCT Project, its designer M3 Engineering and Technology Corporation (M3), and its general contractor, Building and Engineering Contractors, Southwest (BEC Southwest).

  2. KENNEDY SPACE CENTER, FLA. - Suzy Cunningham sings the national anthem to kick off Center Director Jim Kennedy’s first all-hands meeting conducted for employees. She is senior spaceport manager, NASA/Air Force Spaceport Planning and Customer Service Office. Making presentations were Dr. Woodrow Whitlow Jr., KSC deputy director; Tim Wilson, assistant chief engineer for Shuttle; and Bill Pickavance, vice president and deputy program manager, Florida operations, United Space Alliance. Representatives from the Shuttle program and contractor team were on hand to discuss the Columbia Accident Investigation Board report and where KSC stands in its progress toward return to flight.

    NASA Image and Video Library

    2003-09-17

    KENNEDY SPACE CENTER, FLA. - Suzy Cunningham sings the national anthem to kick off Center Director Jim Kennedy’s first all-hands meeting conducted for employees. She is senior spaceport manager, NASA/Air Force Spaceport Planning and Customer Service Office. Making presentations were Dr. Woodrow Whitlow Jr., KSC deputy director; Tim Wilson, assistant chief engineer for Shuttle; and Bill Pickavance, vice president and deputy program manager, Florida operations, United Space Alliance. Representatives from the Shuttle program and contractor team were on hand to discuss the Columbia Accident Investigation Board report and where KSC stands in its progress toward return to flight.

  3. Integrated Evaluation of Closed Loop Air Revitalization System Components

    NASA Technical Reports Server (NTRS)

    Murdock, K.

    2010-01-01

    NASA s vision and mission statements include an emphasis on human exploration of space, which requires environmental control and life support technologies. This Contractor Report (CR) describes the development and evaluation of an Air Revitalization System, modeling and simulation of the components, and integrated hardware testing with the goal of better understanding the inherent capabilities and limitations of this closed loop system. Major components integrated and tested included a 4-Bed Modular Sieve, Mechanical Compressor Engineering Development Unit, Temperature Swing Adsorption Compressor, and a Sabatier Engineering and Development Unit. The requisite methodolgy and technical results are contained in this CR.

  4. Microgravity

    NASA Image and Video Library

    2000-01-30

    Engineers from NASA's Glenn Research Center demonstrate the access to one of the experiment racks planned for the U.S. Destiny laboratory module on the International Space Station (ISS). This mockup has the full diameter, full corridor width, and half the length of the module. The mockup includes engineering mockups of the Fluids and Combustion Facility being developed by NASA's Glenn Research Center. (The full module will be six racks long; the mockup is three racks long). Listening at center is former astronaut Brewster Shaw (center), now a program official with the Boeing Co., the ISS prime contractor. Photo credit: NASA/Marshall Space Flight Center (MSFC)

  5. NASA/LaRC jet plume research

    NASA Technical Reports Server (NTRS)

    Seiner, John M.; Ponton, Michael K.; Manning, James C.

    1992-01-01

    The following provides a summary for research being conducted by NASA/LaRC and its contractors and grantees to develop jet engine noise suppression technology under the NASA High Speed Research (HSR) program for the High Speed Civil Transport (HSCT). The objective of this effort is to explore new innovative concepts for reducing noise to Federally mandated guidelines with minimum compromise on engine performance both in take-off and cruise. The research program is divided into four major technical areas: (1) jet noise research on advanced nozzles; (2) plume prediction and validation; (3) passive and active control; and (4) methodology for noise prediction.

  6. Trade-off results and preliminary designs of Near-Term Hybrid Vehicles

    NASA Technical Reports Server (NTRS)

    Sandberg, J. J.

    1980-01-01

    Phase I of the Near-Term Hybrid Vehicle Program involved the development of preliminary designs of electric/heat engine hybrid passenger vehicles. The preliminary designs were developed on the basis of mission analysis, performance specification, and design trade-off studies conducted independently by four contractors. THe resulting designs involve parallel hybrid (heat engine/electric) propulsion systems with significant variation in component selection, power train layout, and control strategy. Each of the four designs is projected by its developer as having the potential to substitute electrical energy for 40% to 70% of the petroleum fuel consumed annually by its conventional counterpart.

  7. Science of Test Research Consortium: Year Two Final Report

    DTIC Science & Technology

    2012-10-02

    July 2012. Analysis of an Intervention for Small Unmanned Aerial System ( SUAS ) Accidents, submitted to Quality Engineering, LQEN-2012-0056. Stone... Systems Engineering. Wolf, S. E., R. R. Hill, and J. J. Pignatiello. June 2012. Using Neural Networks and Logistic Regression to Model Small Unmanned ...Human Retina. 6. Wolf, S. E. March 2012. Modeling Small Unmanned Aerial System Mishaps using Logistic Regression and Artificial Neural Networks. 7

  8. Research and technology, 1984 report

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Research and technology projects in the following areas are described: cryogenic engineering, hypergolic engineering, hazardous warning instrumentation, structures and mechanics, sensors and controls, computer sciences, communications, material analysis, biomedicine, meteorology, engineering management, logistics, training and maintenance aids, and technology applications.

  9. Site Environmental Report for 2016 Sandia National Laboratories California.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE’s National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology and Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2016 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary ofmore » environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2016, unless noted otherwise. General site and environmental program information is also included.« less

  10. Revisiting software specification and design for large astronomy projects

    NASA Astrophysics Data System (ADS)

    Wiant, Scott; Berukoff, Steven

    2016-07-01

    The separation of science and engineering in the delivery of software systems overlooks the true nature of the problem being solved and the organization that will solve it. Use of a systems engineering approach to managing the requirements flow between these two groups as between a customer and contractor has been used with varying degrees of success by well-known entities such as the U.S. Department of Defense. However, treating science as the customer and engineering as the contractor fosters unfavorable consequences that can be avoided and opportunities that are missed. For example, the "problem" being solved is only partially specified through the requirements generation process since it focuses on detailed specification guiding the parties to a technical solution. Equally important is the portion of the problem that will be solved through the definition of processes and staff interacting through them. This interchange between people and processes is often underrepresented and under appreciated. By concentrating on the full problem and collaborating on a strategy for its solution a science-implementing organization can realize the benefits of driving towards common goals (not just requirements) and a cohesive solution to the entire problem. The initial phase of any project when well executed is often the most difficult yet most critical and thus it is essential to employ a methodology that reinforces collaboration and leverages the full suite of capabilities within the team. This paper describes an integrated approach to specifying the needs induced by a problem and the design of its solution.

  11. Value Engineering

    DTIC Science & Technology

    1986-03-01

    703-756-2320 Department of the Army HQ, DA (Office of the Comptroller of the Army) ATTN: DACA -RMP, Rm 3B725, Pentagon Washington , DC 20310-2070...Secretary of Defense (Acquisition and ILCo.ct(C oan No. Logistics) (C Washington , D.C. 20301 (G) 12. Sponsoring Organization Name and Address 13. Type...4245.8-H WASHINGTON , D.C. 20301-8000 March 17, i986 ACQUISITION AND LOGISTICS FOREWORD Value Engineering (VE) VE is recognized as an effective

  12. TRADE ALARA for design and operations engineers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    This product has been developed by the Training Resources and Data Exchange (TRADE) network for use at Department of Energy (DOE) and DOE contractor facilities. The TRADE network encourages and facilitates the exchange of ideas, techniques, and resources for improving training and development and serves as a forum for the discussion of issues of interest to the DOE community. This TRADE product has been developed for DOE contractor employees who are asked to deliver training to Design and Operations Engineers on the concept of As Low As Reasonably Achievable (ALARA). The ALARA concept is an approach to radiation protection tomore » control or manage exposures as low as social, technical, economic, practical, public policy, and other considerations permit. Worldwide panels of radiation experts have concluded that it is conservative to assume that a proportional relationship exists between radiation dose (exposure) and the biological effects resulting from it. This assumption implies that every dose received, no matter how small, carries some risk: the higher the dose, the higher the risk. The federal government, including agencies such as DOE, subscribes to the concept of ALARA and requires its facilities to subscribe to it as well. This course was developed to introduce engineers to the fundamentals of radiation and contamination reduction that they will use when designing or modifying plant facilities. The course was developed by the ALARA Program group and the Radiation Protection Monitoring/Training Group of Martin Marietta Energy Systems, Inc. at Oak Ridge National Laboratory. We wish to express our appreciation to Emily Copenhaver, Scott Taylor, and Janet Westbrook at Oak Ridge National Laboratory for their willingness to share their labors with the rest of the DOE community and for technical support during the development of the TRADE ALARA for Design and Operations Engineers Course Manual.« less

  13. A Model for Logistics Systems Engineering Management Education in Europe.

    ERIC Educational Resources Information Center

    Naim, M.; Lalwani, C.; Fortuin, L.; Schmidt, T.; Taylor, J.; Aronsson, H.

    2000-01-01

    Presents the need for a systems and process perspective of logistics, and develops a template for a logistics education course. The template addresses functional, process, and supply chain needs and was developed by a number of university partners with core skills in different traditional disciplines. (Contains 31 references.) (Author/WRM)

  14. U.S. Army War College: Key Strategic Issues List

    DTIC Science & Technology

    2006-07-01

    Protocol (EoIP) b. Soldier vs contractor operated and maintained tactical equipment. Are the new soldier systems so “ high tech ” that we cannot fight...approaches to meet the high tech skills demanded by our transformation TOEs? (G-3 ACD) 9. War and Society: a. Has the Army adapted from Industrial-Age to...61 United States Military Academy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65 U.S. Army Corps of Engineers

  15. PBF Cooling Tower. Hot deck of Cooling Tower with fan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower. Hot deck of Cooling Tower with fan motors in place. Fan's propeller blades (not in view) rotate within lower portion of vents. Inlet pipe is a left of view. Contractor's construction buildings in view to right. Photographer: Larry Page. Date: June 30, 1969. INEEL negative no. 69-3781 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. Classified Scrap in Lake Superior.

    DTIC Science & Technology

    1977-07-08

    DEPARTMENT OF THE ARMY St. Paul District, Corps of Engineers Lake Superior Area Canal Park Duluth, Minnesota 55802 THE DAILY MINING GAZETTE...ago. Lind concurred with the reference groupts recommendations that Reserve Mining Company’s discharge of 67,000 tons of taconite tailings into Lake...installation located ap- proximately 13 miles north of Minneapolis - St. Paul, Minnesota . The prime contractor at the plant is Federal Cartridge Corporation with

  17. Manufacturing Aids

    NASA Astrophysics Data System (ADS)

    1983-01-01

    Contractor's work for Lewis Research Center on "thermal barrier" coatings designed to improve aircraft engine efficiency resulted in two related but separate spinoffs. The Materials and Manufacturing Technology Center of TRW, Inc. invented a robotic system for applying the coating, and in the course of that research found it necessary to develop a new, extremely accurate type of optical gage that offers multiple improvements in controlling the quality of certain manufactured parts.

  18. Unintentional Insider Threats: Social Engineering

    DTIC Science & Technology

    2014-01-01

    or business partner (2) who has or had authorized access to an organization’s network, system, or data and who, (3) through action or inaction...features. The accumulation and analysis of incident statistics will also ultimately help stakeholders prioritize different types of UIT threats and...is (1) a current or former employee, contractor, or business partner (2) who has or had authorized access to an organization’s network, system, or

  19. Adaptive Interfaces

    DTIC Science & Technology

    1991-03-01

    Project Engineer: Sharon M. Walter/COES/(315) 330-7650 Prime Contractor: lIT Research Institute (IITRI) 12a. DISTRIBUTION/AVAILABIUTY STATEMENT 12b...F30602- 87-D-0094. This contract is with IIT Research Institute (IITRI) and is sponsored by the Rome Air Development Center. The work was performed by... Research Institute (IITRI) and Rome Air Development Center (RADC) this Final Report for Project 7288, Adaptive Interfaces, Task A. This report is

  20. Environmental Assessment Construction of New Child Development Center at Tinker Air Force Base, Oklahoma

    DTIC Science & Technology

    2010-03-22

    formaldehyde, acetaldehyde, methanol and other HAP from lean bum engines (Included in Addendum F). TABLE 2 Cogeneration Emission Factors ...material which includes recycling of material where feasible. Local landfills have the capacity to accept the amount of waste generated. The contractor...past, present, and reasonably foreseeable future actions. Cumulative impacts can result from individually minor but collectively significant factors

  1. 16. Photographic copy of photograph (from original 4 x 5 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photographic copy of photograph (from original 4 x 5 black and white print in the Army Port Contractors' 'Completion Report' at the Engineering Office, Oakland Army Base, California). Photograph taken prior to June 1942 by unknown photographer. SOUTHWEST BIRDS-EYE VIEW OF WAREHOUSES (BLDGS. 802-805). - Oakland Army Base, Warehouse Type, Tobruk Street, between Warehouse Road & Fifteenth Street, Oakland, Alameda County, CA

  2. The 2001 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Brewer, Jeff C. (Compiler)

    2002-01-01

    This document contains the proceedings of the 34th annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center, November 27-29, 2001. The workshop was attended by scientists and engineers from various agencies of the US Government, aerospace contractors, and battery manufacturers, as well as international participation in like kind. The subjects covered included nickel-hydrogen, nickel-cadmium, lithium-ion, and silver-zinc technologies.

  3. FY 1990 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1990-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 90 are presented. Also included are papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from NTIS. The information may be of value to the scientific and engineering community in determining what information has been published and what is available.

  4. Engineering Design Handbook. Development Guide for Reliability. Part 6. Mathematical Appendix and Glossary

    DTIC Science & Technology

    1976-01-08

    Corps, nonmilitary Government agencies, contractors, private industry, individuals, universities , and others must purchase these Handbooks from...verified by an official Department of Army representative and processed from Defense Documentation Center ( DDC ), ATTN: DDC -TSR, Cameron Station...tell, by looking at a failed item, what classification of failure is involved. Some of the classifications are for mathematical conven- ience only

  5. The Marine Engineers in Today’s MAGTF: Historical Perspective, Consequences and Alternatives

    DTIC Science & Technology

    2013-04-15

    Inhibited Flexibility for Resource Leveling ...........................................................................17 Mission and Capability...21 Inhibited Flexibility for Resource Leveling ...ground combat element ( GCE ); an engineer support battalion (ESB) supports the logistics combat element (LCE); and engineer operations divisions

  6. Business process re-engineering in the logistics industry: a study of implementation, success factors, and performance

    NASA Astrophysics Data System (ADS)

    Shen, Chien-wen; Chou, Ching-Chih

    2010-02-01

    As business process re-engineering (BPR) is an important foundation to ensure the success of enterprise systems, this study would like to investigate the relationships among BPR implementation, BPR success factors, and business performance for logistics companies. Our empirical findings show that BPR companies outperformed non-BPR companies, not only on information processing, technology applications, organisational structure, and co-ordination, but also on all of the major logistics operations. Comparing the different perceptions of the success factors for BPR, non-BPR companies place greater emphasis on the importance of employee involvement while BPR companies are more concerned about the influence of risk management. Our findings also suggest that management attitude towards BPR success factors could affect performance with regard to technology applications and logistics operations. Logistics companies which have not yet implemented the BPR approach could refer to our findings to evaluate the advantages of such an undertaking and to take care of those BPR success factors affecting performance before conducting BPR projects.

  7. Sustainability Logistics Basing - Science and Technology Objective - Demonstration; 50, 300, 1000- Person Base Camp, Analysis of FY12 Operationally Relevant Technical Baseline

    DTIC Science & Technology

    2017-04-10

    Natick Soldier Research , Development and Engineering Center’s Sustainability/Logistics- Basing -Science and Technology Objective – Demonstration to...CERDEC)  Tank Automotive Research , Development, and Engineering Center (TARDEC)  Product Director Contingency Basing Infrastructure (PdD – CBI...assessed using the QoL (O) tool, developed for the SLB-STO-D program by the Consumer Research Team (NSRDEC), based upon the assumptions documented within

  8. Orbit transfer rocket engine technology program. Phase 2: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Erickson, C.; Martinez, A.; Hines, B.

    1987-01-01

    In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.

  9. Orbit transfer rocket engine technology program: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Erickson, C. M.

    1992-01-01

    In Task D.6 of the Advanced Engine Study, three primary subtasks were accomplished: (1) design of parametric data; (2) engine requirement variation studies; and (3) vehicle study/engine study coordination. Parametric data were generated for vacuum thrusts ranging from 7500 lbf to 50,000 lbf, nozzle expansion ratios from 600 to 1200, and engine mixture ratios from 5:1 to 7:1. Failure Modes and Effects Analysis (FMEA) was used as a departure point for these parametric analyses. These data are intended to assist in definition and trade studies. In the Engine Requirements Variation Studies, the individual effects of increasing the throttling ratio from 10:1 to 20:1 and requiring the engine to operate at a maximum mixture ratio of 12:1 were determined. Off design engine balances were generated at these extreme conditions and individual component operating requirements analyzed in detail. Potential problems were identified and possible solutions generated. In the Vehicle Study/Engine Study coordination subtask, vehicle contractor support was provided as needed, addressing a variety of issues uncovered during vehicle trade studies. This support was primarily provided during Technical Interchange Meetings (TIM) in which Space Exploration Initiative (SEI) studies were addressed.

  10. Heat engines

    NASA Astrophysics Data System (ADS)

    Rekos, N. F., Jr.; Parsons, E. L., Jr.

    1989-09-01

    For the past decade, the Department of Energy (DOE) has sponsored projects to develop diesel and gas turbine engines capable of operating on low-cost, coal-based fuels. Much of the current work addresses the use of coal-water fuel (CWF) in diesel and turbines, although there is some work with dry coal feed and other coal fuels. Both the diesel and gas turbine portions of the program include proof-of-concept and support projects. Specific highlights of the program include: engine tests and economic analyses have shown that CWF can replace 70 percent of the diesel oil used in the duty cycle of a typical main-line locomotive; A. D. Little and Cooper-Bessemer completed a system and economic study of coal-fueled diesel engines for modular power and industrial cogeneration markets. The coal-fueled diesel was found to be competitive at fuel oil prices of $5.50 per million British thermal units (MBtu); Over 200 hours of testing have been completed using CWF in full-scale, single-cylinder diesel engines. Combustion efficiencies have exceeded 99 percent; Both CWF and dry coal fuel forms can be burned in short residence time in-line combustors and in off-base combustors with a combustion efficiency of over 99 percent; Rich/lean combustion systems employed by the three major DOE contractors have demonstrated low NO(sub x) emissions levels; Contractors have also achieved promising results for controlling sulfur oxide (SO(sub x)) emissions using calcium-based sorbents; Slagging combustors have achieved between 65 and 95 percent slag capture, which will limit particulate loading on pre-turbine cleanup devices. For many of the gas turbine and diesel applications emission standards do not exist. Our goal is to develop coal-fueled diesels and gas turbines that not only meet all applicable emission standards that do exist, but also are capable of meeting possible future standards.

  11. NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

    NASA Technical Reports Server (NTRS)

    Smith, David A.; Smith, John V.

    2010-01-01

    The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

  12. Teaching Logistics without Formal Classes: A Case Study

    ERIC Educational Resources Information Center

    Carravilla, Maria Antonia; Oliveira, Jose Fernando

    2004-01-01

    This paper describes a case study concerning the teaching of logistics in the Computers and Electrical Engineering degree at FEUP. The logistics course is taken in the last semester of the degree and there are no lectures given by the teachers. All the learning strategy is based upon the autonomous learning capacity of the students, following the…

  13. Research instrumentation for hot section components of turbine engines

    NASA Technical Reports Server (NTRS)

    Englund, D. R.

    1986-01-01

    Programs to develop research instrumentation for use on hot section components of turbine engines are discussed. These programs can be separated into two categories: one category includes instruments which can measure the environment within the combustor and turbine components, the other includes instruments which measure the response of engine components to the imposed environment. Included in the first category are instruments to measure total heat flux and fluctuating gas temperature. High temperature strain measuring systems, thin film sensors (e.g., turbine blade thermocouples) and a system to view the interior of a combustor during engine operation are programs which comprise the second category. The paper will describe the state of development of these sensors and measuring systems and, in some cases, show examples of measurements made with this instrumentation. The discussion will cover work done at NASA Lewis and at various contractor facilities.

  14. Gas engine heat pump cycle analysis. Volume 1: Model description and generic analysis

    NASA Astrophysics Data System (ADS)

    Fischer, R. D.

    1986-10-01

    The task has prepared performance and cost information to assist in evaluating the selection of high voltage alternating current components, values for component design variables, and system configurations and operating strategy. A steady-state computer model for performance simulation of engine-driven and electrically driven heat pumps was prepared and effectively used for parametric and seasonal performance analyses. Parametric analysis showed the effect of variables associated with design of recuperators, brine coils, domestic hot water heat exchanger, compressor size, engine efficiency, insulation on exhaust and brine piping. Seasonal performance data were prepared for residential and commercial units in six cities with system configurations closely related to existing or contemplated hardware of the five GRI engine contractors. Similar data were prepared for an advanced variable-speed electric unit for comparison purposes. The effect of domestic hot water production on operating costs was determined. Four fan-operating strategies and two brine loop configurations were explored.

  15. Mathematical support for surveying measurements in order to obtain the draft tube three-dimensional model

    NASA Astrophysics Data System (ADS)

    Gridan, Maria-Roberta; Herban, Sorin; Grecea, Oana

    2017-07-01

    Nowadays, the engineering companies and contractors are facing challenges never experienced before. They are being charged with - and being held liable for - the health of the structures they create and maintain. To surmount these challenges, engineers need to be able to measure structural movements up to millimetre level accuracy. Accurate and timely information on the status of a structure is highly valuable to engineers. It enables them to compare the real world behaviour of a structure against the design and theoretical models. When empowered by such data, engineers can effectively and cost efficiently measure and maintain the health of vital infrastructure. This paper presents the interpretation of the draft tube topographical measurements in order to obtain its 3D model. Based on the documents made available by the beneficiary and the data obtained in situ, the modernization conclusions were presented.

  16. Liquid Hydrogen Fill

    NASA Image and Video Library

    2016-08-03

    Engineers complete a test of the Ground Operations Demo Unit for liquid hydrogen at NASA's Kennedy Space Center in Florida. The system includes a 33,000 gallon liquid hydrogen storage tank with an internal cold heat exchanger supplied from a cryogenic refrigerator. The primary goal of the testing is to achieve a liquid hydrogen zero boil-off capability. The system was designed, installed and tested by a team of civil servants and contractors from the center's Cryogenic Test Laboratory, with support from engineers at NASA's Glenn Research Center in Cleveland and Stennis Space Center in Mississippi. It may be applicable for use by the Ground Systems Development and Operations Program at Launch Pad 39B.

  17. Supporting Weather Data

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Since its founding in 1992, Global Science & Technology, Inc. (GST), of Greenbelt, Maryland, has been developing technologies and providing services in support of NASA scientific research. GST specialties include scientific analysis, science data and information systems, data visualization, communications, networking and Web technologies, computer science, and software system engineering. As a longtime contractor to Goddard Space Flight Center s Earth Science Directorate, GST scientific, engineering, and information technology staff have extensive qualifications with the synthesis of satellite, in situ, and Earth science data for weather- and climate-related projects. GST s experience in this arena is end-to-end, from building satellite ground receiving systems and science data systems, to product generation and research and analysis.

  18. Solar Stirling system development

    NASA Technical Reports Server (NTRS)

    Stearns, J. W., Jr.; Won, Y. S.; Poon, P. T.; Das, R.; Chow, E. Y.

    1979-01-01

    A low-cost, high-efficiency dish-Stirling solar thermal-electric power system is being developed for test in 1981. System components are the solar concentrator, receiver, fossil fuel combustor, thermal energy storage (TES), engine-generator, and power processing. System conceptualization is completed and design is in progress. Two receiver alternatives are being evaluated, a direct-coupled receiver-engine configuration with no TES and a heat pipe receiver with TES. System cost projections are being made. Goals for the system development task are (1) to develop an advanced dish-Stirling technology, utilizing a team of industrial contractors, (2) to demonstrate that technology at the system level, and (3) to determine how to achieve low production cost.

  19. R&D Plan for Army Applications of AI/Robotics.

    DTIC Science & Technology

    1982-05-01

    Research, Development, and Acquisition (Army) OCE--Office, Chief of Engineers HTTG--High Technology Test Group DNA--Defense Nuclear Agency Contractors...comparison, include both trailer and van-mounted tools and * testing equipment that are generally of sufficient weight and bulk to be mounted and used on a...interactive diagnosis and corrective maintenance information for surface-to-surface missile launching systems beyond the capability of automet’. test equipment

  20. Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)

    NASA Image and Video Library

    1969-01-25

    S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  1. Foundation and Development of Local Trimble User Groups: Perspectives from the Beginning

    NASA Technical Reports Server (NTRS)

    Duncan, Brean W.

    1996-01-01

    Trimble Navigation was one of the original contractors building military grade GPS receivers and has been a dominant manufacturer in the civilian market. Two Trimble user groups have been formed. By participating in GPS user groups, members become more aware of GPS capabilities and opportunities, meet people with similar interests and needs, expand business opportunities, and provide Trimble with valuable information needed to engineer better GPS equipment.

  2. Technology 2001: The Second National Technology Transfer Conference and Exposition, volume 2

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Proceedings of the workshop are presented. The mission of the conference was to transfer advanced technologies developed by the Federal government, its contractors, and other high-tech organizations to U.S. industries for their use in developing new or improved products and processes. Volume two presents papers on the following topics: materials science, robotics, test and measurement, advanced manufacturing, artificial intelligence, biotechnology, electronics, and software engineering.

  3. SEAS (Surveillance Environmental Acoustic Support Program) Support

    DTIC Science & Technology

    1984-02-29

    ASEPS software - Provide support for AMES - Support for OUTPOST CREOLE, BIG DIPPER and MFA , First, a summary of the tasks as delineated in the contract...addition, the contractor will provide an engineer/scientist to support the BIG DIPPER data processing activities at NOSC. Task 3: SEAS Inventory - The...SI to provide support to SEAS for the OUTPOST -’ CREOLE III exercise which followed immediately after the BIG DIPPER .. exercise. OUTPOST CREOLE III

  4. Engineering Quality Software: 10 Recommendations for Improved Software Quality Management

    DTIC Science & Technology

    2010-04-27

    lack of user involvement • Inadequate Software Process Management & Control By Contractors • No “Team” of Vendors and users; little SME participation...1990 Quality Perspectives • Process Quality ( CMMI ) • Product Quality (ISO/IEC 2500x) – Internal Quality Attributes – External Quality Attributes... CMMI /ISO 9000 Assessments – Capture organizational knowledge • Identify best practices, lessons learned Know where you are, and where you need to be

  5. War-gaming application for future space systems acquisition part 1: program and technical baseline war-gaming modeling and simulation approaches

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes static Bayesian game models with "Pure" and "Mixed" games for the development of an optimum Program and Technical Baseline (PTB) solution for affordable acquisition of future space systems. The paper discusses System Engineering (SE) frameworks and analytical and simulation modeling approaches for developing the optimum PTB solutions from both the government and contractor perspectives.

  6. One Door to the Corps: The U.S. Army Engineering and Support Center, Huntsville Historical Update, 1998-2007

    DTIC Science & Technology

    2009-01-01

    with Transpiring Wall Reactor; and Gas Phase Chemical Reduction systems . After much study , ACWA selected three technologies for additional study ...detection systems , and hardware development. Importantly, these advancements allowed for a more effective and cost-efficient remediation process... grounds at the ASPs, the munitions contractors considered a variety of factors, including proximity to the local civilian population and potential

  7. Wave Action and Breakwater Location, Taconite Harbor (Two Islands), Lake Superior, Minnesota: Hydraulic Model Investigation

    DTIC Science & Technology

    1955-05-01

    president, Taconite Contractors, Erie. Mining Company, Duluth, Minnesota The model study was conducted in the Hydraulics Division of the Waterways...CORPS OF ENGINEERS. U. S. ARMY WAVE ACTION AND BREAKWATER LOCATION TACONITE HARBOR (TWO ISLANDS) LAKE SUPERIOR, MINNESOTA ARIIIY-MRC VICKSBURG...Breakwater Location, Taconite Harbor (Two Islands), Lake Superior, Minnesota : Hydraulic Model Investigation 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c

  8. Launch Vehicle Operations Simulator

    NASA Technical Reports Server (NTRS)

    Blackledge, J. W.

    1974-01-01

    The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches.

  9. Turning Desirements into Requirements

    DTIC Science & Technology

    2015-09-01

    a Mustang would do much better. (The author wanted the Aston Martin from the movie “Goldfinger.” You know: The one with the ejection seat, automated ...with the systems engineers to develop specifica- tions for the contractors. Then industry can develop, produce and support the equipment the warfighter...dau.mil. MDAP/MAIS Program Manager Changes With the assistance of the Office of the Secretary of Defense, Defense AT&L magazine publishes the names of

  10. Geotechnical Factors in the Dredgeability of Sediments. Report 1. Geotechnical Descriptors for Sediments to be Dredged

    DTIC Science & Technology

    1993-11-01

    objectives of the work unit. executing dredging projects. The disparities increase risk factors and thus the cost of such SUMMARY: The study identified the...geologists, environmental engineers, biologists, estimators, dredging equipment manufacturers, and dredging contractor personnel have methods for...changed dramatically. A major increase has occurred in the level of contract dredging. Environmental concerns, the consequences of the oil embargo of

  11. Fuel cell technology program

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results of a solid polymer electrolyte fuel cell development program are summarized. A base line design was defined, and materials and components of the base line configuration were fabricated and tested. Concepts representing base line capability extensions in the areas of life, power, specific weight and volume, versatility of operation, field maintenance, and thermal control were identified and evaluated. Liaison and coordination with space shuttle contractors resulted in the exchange of engineering data.

  12. Smart Building. Volume 2: System Description

    DTIC Science & Technology

    2006-05-01

    demonstrated.this technology at the 2002 Winter Olympic Games in Salt Lake City, Utah. The system was installed on a building known as Social Hall Plaza...select the detailed engineering contractors. 3.1.3.8 Sealing the Protective Envelope Due to the type of roof construction on the building there was ...in time to support the Olympics . Prototype testing was completed following the Olympics and additional testing may be performed to better

  13. Bullion to B-fields: The Silver Program of the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Reed, Cameron

    2010-04-01

    Between October 1942 and September 1944, over 14,000 tons of silver bullion bars withdrawn form the U.S. Treasury were melted and cast into magnet coils and busbar pieces for the ``calutron'' electromagnetic isotope-separators constructed at Oak Ridge. Based on Manhattan Engineer District documents, this paper will review the history of this ``Silver Program,'' including discussions of the contractors, production methods, and quantities of materials involved.

  14. Bullion to B-fields: The Silver Program of the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Reed, Cameron

    2010-02-01

    Between October 1942 and September 1944, over 14,000 tons of silver bullion bars withdrawn from the U. S. Treasury were melted and cast into magnet coils and busbar pieces for the ``calutron'' electromagnetic isotope-separators constructed at Oak Ridge. Based on Manhattan Engineer District documents, this paper will review the history of this ``Silver Program,'' including discussions of the contractors, production methods, and quantities of material involved. )

  15. GPHS-RTGs in support of the Cassini Mission

    NASA Astrophysics Data System (ADS)

    1994-10-01

    The progress on the radioisotope generators and ancillary activities is described. This report is organized by program task as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; design, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contractor acquired government owned property (CAGO) acquisition.

  16. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1992-04-01

    The technical progress achieved during the period 30 Mar. - 27 Sep. 1992 is described. Topics covered include: spacecraft integration and liaison; engineering support; safety; qualified unicouple production, ETG fabrication, assembly, and test; ground support equipment; radioisotope thermoelectric generators (RTG) shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, non-capital contractor acquired government owned (CAGO) acquisitions, and CAGO maintenance; and CAGO acquisitions.

  17. 6. Photographic copy of photograph (from original 4 x 5 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of photograph (from original 4 x 5 black and white print in the Army Port Contractors' 'Completion Report' at the Engineering Office, Oakland Army Base, California). Photograph taken April 6, 1942 by unknown photographer. SOUTH AND EAST SIDES OBLIQUE VIEW OF PRIVATE VEHICLE INSPECTION BUILDING (VEHICLE SHED, BLDG. 4). - Oakland Army Base, Private Vehicle Inspection Building, Africa Street & Bataan Avenue, Oakland, Alameda County, CA

  18. 11. Photographic copy of photograph (from original 4 x 5 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of photograph (from original 4 x 5 black and white print in the Army Port Contractors' 'Completion Report' at the Engineering Office, Oakland Army Base, California). Photograph taken January 31, 1942 by unknown photographer. EAST AND NORTH SIDES OBLIQUE VIEW OF EXCHANGE CAFETERIA (BLDG. 60). - Oakland Army Base, Private Exchange Cafeteria, Bataan Avenue & Attu Street, facing Post Headquarters Building, Oakland, Alameda County, CA

  19. Using EPIC to Find Conflicts, Inconsistencies, and Gaps in Department of Defense Policies

    DTIC Science & Technology

    2013-01-01

    documentation; or deliver preliminary findings. All RAND reports un- dergo rigorous peer review to ensure that they meet high standards for research quality...responsibilities and the products that result from their execution. Once the high -level frame- work was defined, successive lower layers were developed to further...Lead or Chief Engineer Component Acquisition Executive ( CAE ) Managers Configuration Steering Board Materiel developer Contractor Milestone Decision

  20. Force Limited Vibration Testing Monograph

    NASA Technical Reports Server (NTRS)

    Scharton, Terry D.

    1997-01-01

    The practice of limiting the shaker force in vibration tests was investigated at the NASA Jet Propulsion Laboratory (JPL) in 1990 after the mechanical failure of an aerospace component during a vibration test. Now force limiting is used in almost every major vibration test at JPL and in many vibration tests at NASA Goddard Space Flight Center (GSFC) and at many aerospace contractors. The basic ideas behind force limiting have been in the literature for several decades, but the piezo-electric force transducers necessary to conveniently implement force limiting have been available only in the last decade. In 1993, funding was obtained from the NASA headquarters Office of Chief Engineer to develop and document the technology needed to establish force limited vibration testing as a standard approach available to all NASA centers and aerospace contractors. This monograph is the final report on that effort and discusses the history, theory, and applications of the method in some detail.

Top