Sample records for contractor implementation plans

  1. Predictive Engineering Implementation at KSC

    NASA Technical Reports Server (NTRS)

    Mosconi, Jane; Schafer, Loraine

    1995-01-01

    This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.

  2. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  3. 48 CFR 244.305-70 - Granting, withholding, or withdrawing approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... or planned decision to grant or withhold approval of the contractor's purchasing system. (b) The PSA... contractor of the decision within ten days after receipt of the report with a copy of the decision to the PSA... request the PSA to verify that the contractor has— (i) Corrected the deficiencies; and (ii) Implemented...

  4. 40 CFR 52.2352 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...

  5. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  6. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  7. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  8. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  9. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  10. 45 CFR 95.610 - Submission of advance planning documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...

  11. 45 CFR 95.610 - Submission of advance planning documents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...

  12. 45 CFR 95.610 - Submission of advance planning documents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...

  13. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  14. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  15. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  16. Safety, reliability, maintainability and quality provisions for the Space Shuttle program

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

  17. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  18. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  19. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowsell, David Leon

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  20. Radon gas: contractor liability for an indoor health hazard.

    PubMed

    Shuko, C M

    1986-01-01

    Many families throughout the United States have recently detected dangerously high concentrations of radon gas inside their homes. Radon, a carcinogenic gas produced from uranium, has been discovered in structures overlying uranium-bearing rock. This discovery may result in litigation to determine contractor liability for building upon radon-releasing rock sites. This Note examines the strengths and weaknesses of the various theories of contractor liability and considers potential statutory claims under the Clean Air Act. The Note suggests, as an alternative approach to recovery, a proposed regulatory scheme and implementation plan.

  1. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  2. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  3. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  4. 48 CFR 370.701 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...

  5. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  6. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  7. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  8. 48 CFR 370.702 - Solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...

  9. 78 FR 59242 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... Nonattainment and Maintenance Areas and Utah and Weber Counties: Gasoline Transfer and Storage;'' R307-335...: Qualification of Contractors and Test Procedures for Vapor Recovery Systems for Gasoline Delivery Tanks.'' This... Counties: Gasoline Transfer and Storage; Rule R307-335, Ozone Nonattainment and [[Page 59249

  10. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  11. Panel to review EOSDIS plans

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

  12. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implement the technologies which it proposes to provide; (2) Previous project clients provide ratings which... DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methods and... cost savings performance services and grouped by technology. The list shall be prepared from statements...

  13. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implement the technologies which it proposes to provide; (2) Previous project clients provide ratings which... DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methods and... cost savings performance services and grouped by technology. The list shall be prepared from statements...

  14. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implement the technologies which it proposes to provide; (2) Previous project clients provide ratings which... DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methods and... cost savings performance services and grouped by technology. The list shall be prepared from statements...

  15. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implement the technologies which it proposes to provide; (2) Previous project clients provide ratings which... DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methods and... cost savings performance services and grouped by technology. The list shall be prepared from statements...

  16. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  17. Administering Safety: Challenge Courses and Climbing Walls.

    ERIC Educational Resources Information Center

    Evans, Will

    1996-01-01

    A camp that is establishing a challenge course or climbing wall must ensure program safety. Discusses financial planning, selecting a contractor, adhering to standards for construction, inspections, staff training, screening of participants, and the administrative challenge of implementing and documenting proper actions. Sidebar discusses a study…

  18. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  19. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Carl J.

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  20. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less

  1. Planning, Implementing, and Documenting an Innovative Statewide Occupational Initiative.

    ERIC Educational Resources Information Center

    Floyd, Jerald D.

    During an 18-month demonstration period, the Illinois Occupational Program Initiative (IOPI), funded through the state's Division of Alcoholism, demonstrated the feasibility of funding individual contractors to create and market employee assistance programs (EAPs) to representatives of industry and labor. Cost estimates for the EAPs were to cover…

  2. Fingerprinting of Materials

    NASA Technical Reports Server (NTRS)

    Workman, Gary L

    1992-01-01

    Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.

  3. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Treesearch

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  4. 48 CFR 352.270-1 - Accessibility of meetings, conferences, and seminars to persons with disabilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The Contractor agrees as follows: (a) Planning. The Contractor shall develop a plan to assure that any... planning the meeting, conference, or seminar, shall include in all announcements and other materials... device for the deaf (TDD). (2) The Contractor shall provide, at no additional cost to the individual...

  5. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less

  6. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  7. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  8. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  9. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  10. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  11. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  12. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  13. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  14. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  15. 48 CFR 3009.171-8 - Ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...

  16. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  17. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting Officer... appropriate). The Contractor shall submit an update to its Plan annually or with its annual fee proposal... innovative strategies for increasing opportunities to fully use the talents and capabilities of a diverse...

  18. 41 CFR 60-4.5 - Hometown plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Hometown plans. 60-4.5...-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.5 Hometown plans. (a) A contractor participating, either individually or through an association, in an approved Hometown Plan (including heavy...

  19. Providing Family Planning Services at Primary Care Organizations after the Exclusion of Planned Parenthood from Publicly Funded Programs in Texas: Early Qualitative Evidence.

    PubMed

    White, Kari; Hopkins, Kristine; Grossman, Daniel; Potter, Joseph E

    2017-10-20

    To explore organizations' experiences providing family planning during the first year of an expanded primary care program in Texas. Between November 2014 and February 2015, in-depth interviews were conducted with program administrators at 30 organizations: 7 women's health organizations, 13 established primary care contractors (e.g., community health centers, public health departments), and 10 new primary care contractors. Interviews addressed organizational capacities to expand family planning and integrate services with primary care. Interview transcripts were analyzed using a theme-based approach. Themes were compared across the three types of organizations. Established and new primary care contractors identified several challenges expanding family planning services, which were uncommon among women's health organizations. Clinicians often lacked training to provide intrauterine devices and contraceptive implants. Organizations often recruited existing clients into family planning services, rather than expanding their patient base, and new contractors found family planning difficult to integrate because of clients' other health needs. Primary care contractors frequently described contraceptive provision protocols that were not evidence-based. Many primary care organizations in Texas initially lacked the capacity to provide evidence-based family planning services that women's health organizations already provided. © Health Research and Educational Trust.

  20. Radon

    MedlinePlus

    ... My Home? Radon Guide for Tenants Builders and Contractors Radon-Resistant Construction Basics and Techniques EPA's Directory of Builders Resources for Builders and Contractors Radon Action Plans The National Radon Action Plan ( ...

  1. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. 48 CFR 42.402 - Visits to contractors' facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...

  3. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  4. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Shane

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  5. 48 CFR 1609.471 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  6. Chemical Hygiene and Safety Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berkner, K.

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through trainingmore » and the Plan will serve as a the framework and reference guide for that training.« less

  7. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  8. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  9. 48 CFR 1509.170-4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...

  10. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  11. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  12. Investigation Regarding Assertions Made by Former United Launch Alliance Executive (REDACTED)

    DTIC Science & Technology

    2016-12-05

    contractors; 3) a conversation occurred between the Under Secretary of Defense for Acquisition , Technology, and Logistics (USD[AT&L]) and the...contracting process; (2) after multiple interviews of DoD and ULA personnel and our reviews of acquisition planning documentation, contracts, and...internal DoD and ULA correspondence, we found no evidence of collusion; (3) the DoD’s implementation of its acquisition strategy was designed to

  13. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  14. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  15. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  16. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less

  17. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  18. 48 CFR 1509.170-2 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 1509.170-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-2 Purpose. This subpart provides guidance to program and contracting personnel regarding the evaluation of contractor performance. It...

  19. 48 CFR 1509.170-1 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-1 Section 1509.170-1 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-1 Scope of subpart. This subpart establishes EPA policy and procedures for evaluation of contractor performance...

  20. Implementation of a Mentor-Protege Program by a Major Department of Defense Contractor

    DTIC Science & Technology

    1991-06-01

    Department of Defense contractors to furnish disadvantaged small business concerns with assistance designed to enhance their capabilities to perform...implementation by analyzing the perceptions of one large DoD contractor and the small disadvantaged business community regarding the Mentor-Protege program...offered by this program would be effective in improving the capabilities of small disadvantaged businesses. There are, however, several barriers present

  1. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  2. SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Timothy A.; Blair, Michael W.; Weis, Eric

    2014-03-03

    The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less

  3. 48 CFR 1509.170-3 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...

  4. 48 CFR 9.601 - Definition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  5. 48 CFR 9.601 - Definition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  6. 48 CFR 9.601 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  7. 48 CFR 9.601 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  8. 48 CFR 9.601 - Definition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  9. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department of Defense (DoD...) to implement provisions of law limiting the periods allowed for contractor comments on past....S.C. 2302 Note). Section 853, entitled ``Inclusion of Data on Contractor Performance in Past...

  10. 48 CFR 1509.170-7 - Release of ratings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of... contacting the EPA contracting officer responsible for the evaluation. (b) Contractors' performance ratings... contract is located. Requests for past performance evaluations during the period the information may be...

  11. 48 CFR 1509.170-6 - Filing of forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...

  12. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    NASA Astrophysics Data System (ADS)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  13. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  14. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required service. (B) Production capability. An evaluation of the prospective contractor's ability to plan.... (C) Quality assurance capability. An assessment of the prospective contractor's capability to meet the quality assurance requirements of the proposed contract. It may involve an evaluation of the...

  15. 48 CFR 1509.170-7 - Release of ratings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Performance System will have direct access to all Reports, including those of EPA, in the National Institutes of Health's database. Information on EPA contractors' performance ratings may also be obtained by... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of...

  16. 48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...

  17. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  18. RURALSIM: the design and implementation of a rural EMS simulator.

    PubMed

    Shuman, L J; Wolfe, H; Gunter, M J

    1992-01-01

    Why were these applications of simulation technology unsuccessful? Parochialism, the volunteer nature of EMS planning, and limited regional commitment to resolve such complex problems at the local level all combined to present significant barriers to implementation. Political factors which posed the most significant barriers included: conservative attitudes concerning the funding and regulation of EMS activities by local governments; general opposition to governmental intervention in the private sector; strong resistance to mandatory standards for EMS; jurisdictional disputes between EMS-related agencies; lack of cooperation between the local governments; competition between prehospital-care providers and between hospitals; overemphasis on local jurisdictional boundaries in the planning and delivery of services; and the allocation of EMS resources, such as ambulances, according to political priorities, rather than more objective criteria. Based upon the results of the four field tests, the following observations are relevant: 1. RURALSIM is a very complex simulator. While every effort was made to assure generalizability, for any given situation, it required extensive modification and tailoring. The result was a model capable of handling a rather diverse set of situations, but one that could not be turned over to the general public for use. To implement RURALSIM required the participation of the University of Pittsburgh research team. The newer simulation languages now available alleviate this problem somewhat. 2. RURALSIM's complexity was needed to examine the different alternatives proposed by local planners. It was particularly needed in order to simulate each region's existing system. Such "base-line" simulations were required in order to achieve face validity and provide a basis for comparing alternatives. 3. With hindsight, a major weakness was the limited amount of face-to-face interaction between local planners and decision makers and the University of Pittsburgh staff. Only two trips to the region were budgeted. This proved to be insufficient and placed too much responsibility for model interpretation and analysis on the local contractors. 4. In none of the four test sites did the contractors and/or local health planners have the authority, influence and/or incentives necessary to develop regional EMS systems. In particular, none of the contractors were in the position to be decision makers, nor was there ever only one decision maker. This is not a criticism of the contractors, who did their best under difficult circumstances. Rather, it is a criticism of the state of eMS system development in the US in the early 1980s. There were few examples where regional systems developed successfully in the face of serious opposition from local interests.(ABSTRACT TRUNCATED AT 400 WORDS)

  19. 48 CFR 509.105-1 - Obtaining information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 509.105-1... any appropriate activities, e.g., legal counsel, quality control, contract management, credit and...

  20. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...

  1. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...

  2. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...

  3. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...

  4. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  7. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  8. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  9. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  10. U.S. Northern Command > About USNORTHCOM > Doing Business with USNORTHCOM

    Science.gov Websites

    Central Contractor Registration (CCR) http://www.ccr.gov Vendors should register in the U.S. federal government's Central Contractor Registration (CCR). A Data Universal Numbering System (DUNS®) number, provided planning and conducting contracting and contractor management functions in support of joint operations

  11. Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Arguello, Bryan

    This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

  12. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick

    The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-­1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifiesmore » the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.« less

  14. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  15. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  16. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  17. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  18. Special Purpose Systems

    DTIC Science & Technology

    2017-01-30

    Nontraditional Defense Contractor Participation, and Plans for Next Quarter. II. Business Status Report. The business status report shall provide...DoD & DoD Contractors only. E. FINAL BUSINESS STATUS REPORT At the completion of the Ordnance Technology Initiative Agreement, the...traditional Contractors to produce advanced machining techniques that are required by the SPS group. • Provide acquisition support for reducing

  19. 48 CFR 209.570-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prospective contractor meets the definition of “lead system integrator”; (2) Consider all information... workforce or a system engineering and technical assistance contractor; (2) Shall include a plan for phasing...

  20. 48 CFR 1509.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-4 Obtaining access to proprietary information. Contractors gaining access to confidential business... business information. ...

  1. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  2. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  3. Recovery Audit Contractor medical necessity readiness: one health system's journey.

    PubMed

    Scott, Judith A; Camden, Mindy

    2011-01-01

    To develop a sustainable approach to Recovery Audit Contractor medical necessity readiness that mitigates the regulatory and financial risks of the organization. Acute care hospitals. Utilizing the model for improvement and plan-do-study-act methodology, this health system designed and implemented a medical necessity case management program. We focused on 3 areas for improvement: medical necessity review accuracy, review timeliness, and physician adviser participation for secondary reviews. Over several months, we improved accuracy and timeliness of our medical necessity reviews while also generating additional inpatient revenue for the health system. We successfully enhanced regulatory compliance and reduced our financial risks associated with Recovery Audit Contractor medical necessity audits. A successful medical necessity case management program can not only enhance regulatory compliance and reduce the amount of payments recouped by Medicare, but also generate additional inpatient revenue for your organization. With health care reform and accountable care organizations on the horizon, hospitals must find ways to protect and enhance revenue in order to carry out their missions. This is one way for case managers to help in that cause, to advocate for the care of their patients, and to bring value to the organization.

  4. 48 CFR 1409.405 - Effect of listing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.405 Effect of listing. When a CO finds that a compelling reason exists to conduct business with a contractor listed on...

  5. 75 FR 41087 - Conforming Changes to Applicant Submission Requirements; Implementing Federal Financial Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... Report and Central Contractor Registration Requirements AGENCY: Office of the Secretary, HUD. ACTION... codifies the requirement that applicants for HUD assistance possess an active Central Contractor... conform the reporting requirements to those provided for by the FFR. B. Requirement for Central Contractor...

  6. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  7. 23 CFR 230.204 - Implementation of supportive services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... majority and minority contractors, contractors' associations, minority groups, and other persons or..., such as technical assistance, managerial assistance, counseling, certification assistance, and follow...

  8. 48 CFR 43.104 - Notification of contract changes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractor considers that the Government has effected or may effect a change in the contract that has not... plan for its funding; (2) countermand the alleged change; or (3) notify the contractor that no change...

  9. 48 CFR 43.104 - Notification of contract changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor considers that the Government has effected or may effect a change in the contract that has not... plan for its funding; (2) countermand the alleged change; or (3) notify the contractor that no change...

  10. Fiscal Year 2014: Comprehensive Oversight Plan for Southwest Asia

    DTIC Science & Technology

    2013-09-30

    rule of law. We plan to focus primarily on DOS Bureau of International Narcotics and Law Enforcement (INL) Justice Sector Support Program ( JSSP ...Specifically, (1) assess whether JSSP contractor(s) provided qualified trainers and services in accordance with the terms of the contract(s); (2...and USAID justice sector training efforts and determine the extent to which these programs complement the JSSP . (Project: SIGAR-073A) Dec-12 Oct-13

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

  13. 48 CFR 9.106 - Preaward surveys.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...

  14. 48 CFR 9.106 - Preaward surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...

  15. 48 CFR 9.106 - Preaward surveys.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...

  16. 48 CFR 9.106 - Preaward surveys.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...

  17. 48 CFR 9.106 - Preaward surveys.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...

  18. Assessment of Navy Contract Management Processes

    DTIC Science & Technology

    2016-04-30

    Defense (DoD) and defense contractor organizational contract management process capability. The CMMM has been previously applied at Air Force, Army...Navy, and defense contractor organizations. Specific to the Navy, assessments were conducted at three Navy contracting centers using the CMMM. These...agency’s poor contract planning, contract administration, and contractor oversight (DoDIG, 2009, 2012, 2013, 2014). The DoD’s response to the GAO’s high

  19. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  20. 48 CFR 1509.505-70 - Information sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information sources. 1509... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-70 Information sources. (a) Disclosure. Prospective EPA Contractors responding to solicitations or submitting unsolicited...

  1. 48 CFR 9.305 - Risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...

  2. 48 CFR 9.305 - Risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...

  3. 48 CFR 9.305 - Risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...

  4. 48 CFR 9.305 - Risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...

  5. 48 CFR 9.103 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 9.103 Section 9.103 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.103 Policy. (a) Purchases shall be made from...

  6. 48 CFR 12.501 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Applicability. 12.501 Section 12.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... contractor is reselling or distributing commercial items of another contractor without adding value. This...

  7. An empirical analysis of strategy implementation process and performance of construction companies

    NASA Astrophysics Data System (ADS)

    Zaidi, F. I.; Zawawi, E. M. A.; Nordin, R. M.; Ahnuar, E. M.

    2018-02-01

    Strategy implementation is known as action stage where it is to be considered as the most difficult stage in strategic planning. Strategy implementation can influence the whole texture of a company including its performance. The aim of this research is to provide the empirical relationship between strategy implementation process and performance of construction companies. This research establishes the strategy implementation process and how it influences the performance of construction companies. This research used quantitative method approached via questionnaire survey. Respondents were G7 construction companies in Klang Valley, Selangor. Pearson correlation analysis indicate a strong positive relationship between strategy implementation process and construction companies’ performance. The most importance part of strategy implementation process is to provide sufficient training for employees which directly influence the construction companies’ profit growth and employees’ growth. This research results will benefit top management in the construction companies to conduct strategy implementation in their companies. This research may not reflect the whole construction industry in Malaysia. Future research may be resumed to small and medium grades contractors and perhaps in other areas in Malaysia.

  8. 75 FR 76260 - Conforming Changes to Applicant Submission Requirements; Implementing Federal Financial Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Report and Central Contractor Registration Requirements AGENCY: Office of the Secretary, HUD. ACTION... that applicants for HUD assistance possess an active Central Contractor Registration (CCR). HUD is...

  9. Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehman, L. L.; Nichols, W. E.

    The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements themore » requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.« less

  10. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  11. 76 FR 82240 - Implementing the Provisions of the Communications Act of 1934, as Enacted by the Twenty-First...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... purchased from the Commission's duplicating contractor at Portals II, 445 12th Street SW., Room CY- B402, Washington, DC 20554. Customers may contact the Commission's duplicating contractor at its web site, www... duplicating contractor, Best Copy and Printing, Inc., 445 12th Street SW., Room CY-B402, Washington, DC 20554...

  12. 48 CFR 1409.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...

  13. Report: Lack of Project Plan Resulted in Transition and Contractor Performance Problems for the Institutional Controls Tracking System

    EPA Pesticide Factsheets

    Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.

  14. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope. 23.900 Section 23...

  15. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope. 23.900 Section 23...

  16. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope. 23.900 Section 23...

  17. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope. 23.900 Section 23...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Charles Frederick

    Lessons learned are more in vogue today than at any time in our history. You can’t tune into a news broadcast without hearing a reference to the concept – and for good reason. People are finally accepting the idea that they may be able to benefit from the experiences of others. Corporations, government departments, and even the military are actively using lessons learned information to help them to achieve their varied goals. The Department of Energy is one of the government departments that has a Lessons Learned Program and requires its contractors to develop a program of their own. Unfortunately,more » adequate guidance is not available to enable contractors to design a fully mature program (i.e., a program that will immediately meet their every need) and to ensure that it is implemented such that it will be deemed acceptable during subsequent assessments. The purpose of this paper is to present the reader with information that might help him or her better plan and develop a new or upgraded Lessons Learned Program. The information is based on the actual development and implementation of a “second generation” lessons learned program and is presented as a chronicle of the steps taken to build the rudimentary system and the subsequent events and problems that led to the programs present-day configuration.« less

  19. 48 CFR 809.106 - Pre-award surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...

  20. 48 CFR 809.106 - Pre-award surveys.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...

  1. 48 CFR 809.106 - Pre-award surveys.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...

  2. 48 CFR 809.106 - Pre-award surveys.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...

  3. 48 CFR 809.106 - Pre-award surveys.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...

  4. 48 CFR 9.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... use or (2) available to the Government or contractor from other sources without restriction. (b) A... source selection information by acquiring the services of marketing consultants which, if used in...

  5. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  6. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  7. 48 CFR 9.405 - Effect of listing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Effect of listing. 9.405 Section 9.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 9.405 Effect of listing. (a) Contractors...

  8. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5 Contract clauses. (a) General contract clause. All contracts and simplified acquisitions of the types set forth in 2009.570-4(b) must include the clause entitled, “Contractor Organizational Conflicts of...

  9. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  10. Extended-Release Naltrexone: A Qualitative Analysis of Barriers to Routine Use.

    PubMed

    Alanis-Hirsch, Kelly; Croff, Raina; Ford, James H; Johnson, Kim; Chalk, Mady; Schmidt, Laura; McCarty, Dennis

    2016-03-01

    The Medication Research Partnership (a national health plan and nine addiction treatment centers contracted with the health plan) sought to facilitate the adoption of pharmacotherapy for alcohol and opioid use disorders. Qualitative analysis of interviews with treatment center change leaders, individuals working for the manufacturer and its technical assistance contractor, and health plan managers extracted details on the processes used to order, store, bill for, and administer extended-release naltrexone. Qualitative themes were categorized using domains from the Consolidated Framework for Implementation Research (intervention characteristics, outer setting, inner setting, and provider characteristics). Characteristics of XR-NTX that inhibited use included the complexity of ordering and using the medication; cost was also a barrier. Outer setting barriers reflected patient needs and external health plan policies on formulary coverage, benefit management, and reimbursement. Program structures, the lack of physician linkages, a culture resistant to the use of medication, and unease with change were inner setting elements that limited use of XR-NTX. Patient stereotypes and a lack of knowledge about XR-NTX affected practitioner willingness to treat patients and prescribe XR-NTX. The Consolidated Framework for Implementation Research provided a useful lens to understand and interpret the processes affecting access to XR-NTX. Copyright © 2015 Elsevier Inc. All rights reserved.

  11. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... from DCMA insurance/pension specialists and DCAA auditors, determines a CIPR is needed based on a risk... needs to follow up on contractor implementation of prior CIPR recommendations. (c) The DCAA auditor...

  12. Product Line Acquisition in the DoD: The Promise, The Challenges

    DTIC Science & Technology

    1999-12-01

    Organizational Structure 8 3.4 Providing an Appropriate Funding Model 9 3.5 Developing and Implementing an Acquisition Strategy 10 3.6 Contractor Interface...providing an appropriate funding model • achieving the right organizational structure • developing and implementing an acquisition strategy • contractor...organizational change rather than attempt a risky enterprise overhaul. 3.4 Providing an Appropriate Funding Model The funding model is closely

  13. Database management systems for process safety.

    PubMed

    Early, William F

    2006-03-17

    Several elements of the process safety management regulation (PSM) require tracking and documentation of actions; process hazard analyses, management of change, process safety information, operating procedures, training, contractor safety programs, pre-startup safety reviews, incident investigations, emergency planning, and compliance audits. These elements can result in hundreds of actions annually that require actions. This tracking and documentation commonly is a failing identified in compliance audits, and is difficult to manage through action lists, spreadsheets, or other tools that are comfortably manipulated by plant personnel. This paper discusses the recent implementation of a database management system at a chemical plant and chronicles the improvements accomplished through the introduction of a customized system. The system as implemented modeled the normal plant workflows, and provided simple, recognizable user interfaces for ease of use.

  14. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... for disagreeing. (3) The Contracting Officer will evaluate the Contractor's response and notify the...

  15. 48 CFR 1509.406-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.406-3 Procedures. (a... who do not appear on the GSA Consolidated List; e.g., those who are ineligible based on a settlement...) Obtain the HCA's recommendation prior to reaching a voluntary exclusion settlement with a Contractor in...

  16. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  17. The application of automated operations at the Institutional Processing Center

    NASA Technical Reports Server (NTRS)

    Barr, Thomas H.

    1993-01-01

    The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.

  18. 26 CFR 1.457-6 - Timing of distributions under eligible plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... under section 401(k) for additional guidance concerning severance from employment. (2) Independent contractors—(i) In general. An independent contractor is considered to have a severance from employment with... anticipates a renewal of a contractual relationship or the independent contractor becoming an employee. For...

  19. Distributed collaborative environments for virtual capability-based planning

    NASA Astrophysics Data System (ADS)

    McQuay, William K.

    2003-09-01

    Distributed collaboration is an emerging technology that will significantly change how decisions are made in the 21st century. Collaboration involves two or more geographically dispersed individuals working together to share and exchange data, information, knowledge, and actions. The marriage of information, collaboration, and simulation technologies provides the decision maker with a collaborative virtual environment for planning and decision support. This paper reviews research that is focusing on the applying open standards agent-based framework with integrated modeling and simulation to a new Air Force initiative in capability-based planning and the ability to implement it in a distributed virtual environment. Virtual Capability Planning effort will provide decision-quality knowledge for Air Force resource allocation and investment planning including examining proposed capabilities and cost of alternative approaches, the impact of technologies, identification of primary risk drivers, and creation of executable acquisition strategies. The transformed Air Force business processes are enabled by iterative use of constructive and virtual modeling, simulation, and analysis together with information technology. These tools are applied collaboratively via a technical framework by all the affected stakeholders - warfighter, laboratory, product center, logistics center, test center, and primary contractor.

  20. Medicaid integrity program; limitation on contractor liability. Final rule.

    PubMed

    2007-11-30

    The Medicaid Integrity Program (the Program) provides that the Secretary promote the integrity of the Medicaid program by entering into contracts with contractors that will review the actions of individuals or entities furnishing items or services (whether fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of the plan approved under section 1115 of the Social Security Act; audit claims for payment of items or services furnished, or administrative services furnished, under a State plan; identify overpayments of individuals or entities receiving Federal funds; and educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide for limitations on a contractor's liability while performing these services under the Program. The final rule will, to the extent possible, employ the same or comparable standards and other substantive and procedural provisions as are contained in section 1157 (Limitation on Liability) of the Social Security Act.

  1. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  2. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  3. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  4. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  5. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  6. Idaho National Laboratory Site Pollution Prevention Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less

  7. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in paragraph (e) of this clause. As an LFPP for the listed items, the contractor will be solicited..., i.e. by assigning workload to a government-owned facility. (b) The Contractor agrees to: (i) Update... certifies that this capacity is not shared by any other mobilization production requirements. (e) This...

  8. 48 CFR 904.7004 - Findings, determination, and contract award or termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... that award of a contract to an offeror(s) or continued performance of a contract by a contractor will... types of plans that a contractor can propose are: measures which provide for physical or organizational separation of the facility or organizational component containing the classified information or special...

  9. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  10. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  11. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  12. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  13. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  14. Risk of Contractors’ Claims On the Example of Road Works

    NASA Astrophysics Data System (ADS)

    Rybka, Iwona; Bondar-Nowakowska, Elżbieta; Pawluk, Katarzyna; Połoński, Mieczysław

    2017-10-01

    The aim of the study is to analyse claims filed by building contractors during the project implementation. The work is divided into two parts. In the first part problems associated with the management of claims in the construction process were discussed. Bearing in mind that claims may result in prolongation of the investment or exceeding planned budget, possibilities of applying information included in documents connected with claims procedure to risk management was analysed in the second part of the study. The basis of the analysis is a review of 226 documents. They originate from 8 construction sites completed in the last 5 years in southwestern Poland. In each case, these were linear road projects, executed by different contractors, according to conditions in the contract set out in the “Yellow Book” FIDIC. In the study, other documents relating events that according to contractors entitled them to claim were also analysed. They included among others: project documentation, terms of reference, construction log, reports and correspondence under the contract. The events constituting the reason for contractors` claims were classified according to their sources. 8 areas of potential threats were distinguished. They were presented in the form of a block diagram. Most events initiating the claims were reported in the following group - adverse actions of third parties, while the fewest were recorded in the group - the lack of access to the construction site. Based on calculated similarity indicators it was found that considered construction sites were diversified in terms of the number of the events occurrence that generated the claim and their sources. In recent years, many road projects are completed behind the schedule and their initially planned budgets are significantly exceeded. Conducted research indicated that data derived from the analysis of documents connected with claims can be applied to identify and classify both cost and schedule risk factors. Obtained data can also be useful at the stage of risk control because early diagnosis of threats in relation to technical and organizational aspects is necessary to take effective action.

  15. Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2016-10-25

    proposed plan include the following:  GD/EB is to be the prime contractor for designing and building Ohio replacement boats;  HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%;  GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement

  16. F 35 JOINT STRIKE FIGHTER DOD Needs to Complete Developmental Testing Before Making Significant New Investments

    DTIC Science & Technology

    2017-04-01

    from contractors . Until Block 3F testing is complete, DOD will not have the knowledge it needs to present a sound business case for Block 4. Second...January 2017 the details of this plan were unclear because DOD’s 2018 budget was not final and negotiations with the contractors were ongoing...management reports and historical test data; discussed key aspects of F-35 development with program management and contractor officials; and compared

  17. Defense Contracting Integrity. Opportunities Exist to Improve DOD’s Oversight of Contractor Ethics Programs

    DTIC Science & Technology

    2009-09-01

    NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT 15...Implementing FAR Ethics Rules 10 Table 4: Contractor Responses on Practices Now Required by the FAR for Code of Business Ethics and Conduct 12 Table 5...Fiscal Year 2006 35 Table 12 : Required FAR Components for Contractor Ethics Program Practices 43 Figure Figure 1: DOD Hotline Posters Available

  18. Simulation of tunneling construction methods of the Cisumdawu toll road

    NASA Astrophysics Data System (ADS)

    Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.

    2017-11-01

    Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.

  19. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    NASA Astrophysics Data System (ADS)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  20. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  1. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  2. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  3. Internship - practical education

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porell, A.L.; Bauman, H.F.

    1989-01-01

    The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less

  4. Common occupational classification system - revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahlman, E.J.; Lewis, R.E.

    1996-05-01

    Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less

  5. 48 CFR 52.237-3 - Continuity of Services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...

  6. 48 CFR 52.237-3 - Continuity of Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...

  7. Not All Parts Are Created Equal: The Impact Of Counterfeit Parts In The Air Force Supply Chain

    DTIC Science & Technology

    2017-04-06

    Government implemented a whole of government approach to tackle this issue. This issue affects both DOD, defense contractors by increasing costs...and oversight to reduce Supply Chain Risk”.2 In other words, the issue has not been resolved. This issue affects both DOD, defense contractors by...U.S. parts distributors that sprang up virtually overnight after Congress did away with requiring primary government contractors to certify all

  8. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  9. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  10. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  11. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  12. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  13. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  14. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  15. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  16. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  17. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Group insurance plans. 2828... Contracting Requirements BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  18. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  19. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  20. Implementing Coordinative Acquisition as a Viable Streamlined Acquisition Process in the Department of Defense (DoD): Will Contractors Participate?

    DTIC Science & Technology

    2006-12-01

    These include equitable estoppel , fair competition, appearance of conflict of interests (government and contractor relationship), and most...importantly, intellectually property rights. Regarding equitable estoppel , one legal definition defines it as follows: “A type of estoppel that bars a

  1. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  2. 43 CFR 46.105 - Using a contractor to prepare environmental documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Protection and Enhancement of Environmental... contractor to prepare any environmental document in accordance with the standards of 40 CFR 1506.5(b) and (c...) Preparation and adequacy of the environmental documents; and (b) Independent evaluation of the environmental...

  3. Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report

    DTIC Science & Technology

    2010-04-30

    amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition

  4. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  5. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  6. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  7. 48 CFR 31.205-42 - Termination costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...

  8. 48 CFR 31.205-42 - Termination costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...

  9. 48 CFR 31.205-42 - Termination costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...

  10. 48 CFR 31.205-42 - Termination costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...

  11. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  12. 48 CFR 28.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the... other refunds to which the contractor may be entitled in the future shall be taken into account. ...

  13. Emergency preparedness and planning

    NASA Technical Reports Server (NTRS)

    Bouvier, Kenneth

    1993-01-01

    Monsanto's emergency response plan in dealing with hazardous materials at their facilities is presented. Topics discussed include the following: CPR training; emergency medial training; incident reports; contractor injuries; hazardous materials transport; evacuation; and other industrial safety concerns.

  14. 29 CFR 1952.107 - Changes to approved plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...

  15. LANL Safety Conscious Work Environment (SCWE) Self-Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hargis, Barbara C.

    2014-01-29

    On December 21, 2012 Secretary of Energy Chu transmitted to the Defense Nuclear Facilities Safety Board (DNFSB) revised commitments on the implementation plan for Safety Culture at the Waste Treatment and Immobilization Plant. Action 2-5 was revised to require contractors and federal organizations to complete Safety Conscious Work Environment (SCWE) selfassessments and provide reports to the appropriate U.S. Department of Energy (DOE) - Headquarters Program Office by September 2013. Los Alamos National Laboratory (LANL) planned and conducted a Safety Conscious Work Environment (SCWE) Self-Assessment over the time period July through August, 2013 in accordance with the SCWE Self-Assessment Guidance providedmore » by DOE. Significant field work was conducted over the 2-week period August 5-16, 2013. The purpose of the self-assessment was to evaluate whether programs and processes associated with a SCWE are in place and whether they are effective in supporting and promoting a SCWE.« less

  16. MCC/shuttle test plan. Volume 1: Philosophy and guidelines

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

  17. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  18. 76 FR 32846 - Defense Federal Acquisition Regulation Supplement; Representation Relating to Compensation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... written post-employment ethics opinion before receiving compensation from a contractor. It also applies to... procurement integrity for DoD. 3. DFARS 203.171-3 is an implementation of section 847 of the NDAA for FY 2008... receiving compensation from the contractor, the post- employment ethics opinion regarding post-employment...

  19. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  20. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  1. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  2. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  3. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  4. Benefit Evaluation of Implementing BIM in Construction Projects

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  5. 48 CFR 7.300 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false [Reserved] 7.300 Section 7.300 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 7.300 [Reserved] ...

  6. 78 FR 78952 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which will be submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information will begin on January 6, 2014.

  7. Recovery Act Hospital Alteration Project at Naval Air Station Jacksonville

    DTIC Science & Technology

    2010-12-07

    QMAD Quantitative Methods and Analysis Division RLF Rogers Lovelock & Fritz, Incorporated SE Southeast SF Square Feet SOW Statement of Work TMA TRICARE...Finally, the contractor, Rogers Lovelock & Fritz, Incorporated, reported the recipient information required by the Recovery Act. What We Recommend...contractor, Rogers Lovelock & Fritz, Incorporated (RLF), reported the recipient information required by the Recovery Act. Planning: Initially, Project

  8. 48 CFR 237.7602 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... terms and conditions of their contracts, during periods of crisis. As a general rule, the designation of... services shall have a written plan to ensure the continuation of these services in crisis situations...-provided written plan. Contractors will activate such plans only during periods of crisis, as directed by...

  9. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  10. Ninth Annual NASA/Contractors Conference on Quality and Productivity. World Class Excellence: The Journey Continues. Conference presentations

    NASA Technical Reports Server (NTRS)

    Templeton, Geoffrey B. (Editor); Stewart, Lynne M. (Editor)

    1992-01-01

    The topics covered include the following: The George M. Low Trophy; total quality assessment and measurement; using award criteria to improve organizational effectiveness; results--keeping an eye on the bottom line; capturing customer satisfaction; moving from management to leadership; leadership versus management; transforming the management team; leadership success stories; success stories in the quest for excellence; small business successes; education success stories; government success stories; tools and techniques for total quality management (TQM) integration; planning and organizing for TQM integration; successful stories for implementing system level TQM/CI tools; assessing TQM results; establishing an environment for continuous improvement at NASA; empowerment; synergism of partnering; and partnerships in education.

  11. WIPP Remote-Handled TRU Waste Program Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Most, W.; Kehrman, B.

    2006-07-01

    There are two major regulatory approval milestones necessary in order to commence disposal operations for remote-handled transuranic (RH TRU) waste at the Waste Isolation Pilot Plant (WIPP)-the RH TRU hazardous waste permit modification request [1] and the radiological characterization plan [2]. One of those milestones has been achieved. The US Environmental Protection Agency (EPA) issued its final decision to approve the Department of Energy's (DOE) RH TRU radiological characterization plan along with the RH TRU Waste Characterization Program Implementation Plan [3], on March 26, 2004. The RH TRU hazardous waste permit modification request still awaits agency approval. In EPA's decisionmore » to approve the DOE's RH TRU radiological characterization plan, the EPA also set forth the process for approving site-specific RH TRU waste characterization programs. Included in the March 29, 2005, RH TRU second Notice of Deficiency [4] (NOD) on the Class 3 Permit Modification Request for RH TRU Waste, the New Mexico Environment Department (NMED) requested that the Permittees combine their responses for the RH TRU Waste NOD with the Section 311 permit modification request NOD. The Combined Response Document was submitted April 28, 2005 [5]. Another NOD [6] was issued by the NMED on September 1, 2005, to clarify the Permittees' proposal and submit these clarifications to the administrative record. Combining both the chap. 311 [7] and RH TRU waste permit modification requests allows for both the regulator and Permittees to expedite action on the modification requests. The Combined Response Document preserves human resources and costs by having only one administrative process for both modification requests. Facility readiness requirements of the RH TRU waste final permit [8] must be implemented to declare that the WIPP is ready to receive RH TRU waste for storage and disposal. To demonstrate readiness, the WIPP is preparing for an Operational Readiness Review (ORR) of the RH TRU waste management equipment, system, and procedures. Required by DOE Order, the ORR demonstrates the capability of managing RH TRU waste. The Management and Operating Contractor (MOC) for the WIPP must first perform a Line Management Assessment. Upon successful completion of the Line Management Assessment, the MOC performs the Contractor ORR and presents the results to the local DOE office. At that time, the local DOE office performs its own ORR to declare readiness to DOE Headquarters. (authors)« less

  12. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  13. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  14. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  15. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...

  16. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...

  17. 10 CFR 719.12 - What information must be included in the Legal Management Plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false What information must be included in the Legal Management Plan? 719.12 Section 719.12 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan, Staffing and Resource Plan and Annual Legal Budget § 719.12 What information must be...

  18. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  19. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  20. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  1. The Fifth Annual NASA/Contractors Conference on Quality and Productivity. Quality: A Commitment to the Future

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.

  2. 10 CFR 851.12 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENERGY WORKER SAFETY AND HEALTH PROGRAM Program Requirements § 851.12 Implementation. (a) Contractors... taking any additional protective action that is determined to be necessary to protect the safety and health of workers. ...

  3. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  4. Quality program plan for the Ultraviolet Spectrometer Experiment S169, Revision C

    NASA Technical Reports Server (NTRS)

    Vinson, W. W.

    1971-01-01

    The quality progress plan establishes the requirements for a system of controls to assure compliance with the quality assurance requirements as set forth in NASA quality program provisions for aeronautical and space system contractors.

  5. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  6. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for high-level waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assure appropriate data will be collected to support the activity, ''Confirm Tank T is Acceptable for HLW Feed.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  7. Hanford Site Beryllium Program: Past, Present, and Future - 12428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fisher, Mark; Garcia, Pete; Goeckner, Julie

    2012-07-01

    The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanfordmore » Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)« less

  8. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be ensured; and, (6) The contractor's corporate approach to legal decision making. ... 10 Energy 4 2011-01-01 2011-01-01 false What information must be included in the legal management... Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  9. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  10. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  11. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  12. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  13. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  14. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  15. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  16. Risk Analysis of Return Support Material on Gas Compressor Platform Project

    NASA Astrophysics Data System (ADS)

    Silvianita; Aulia, B. U.; Khakim, M. L. N.; Rosyid, Daniel M.

    2017-07-01

    On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000, -.

  17. 48 CFR 2907.300 - Availability of inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Availability of inventory... PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 2907.300 Availability of inventory. The Department of Labor's FAIR Act inventory of commercial activities performed by federal employees...

  18. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  19. 78 FR 12051 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which was submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information, which is related to the Nonroad Diesel Engine Program will begin on February 22, 2013.

  20. Baseline Water Demand at Forward Operating Bases

    DTIC Science & Technology

    2013-09-15

    population, often equaling or exceeding the military population: • Brigade: 6000 soldiers • Battalion: 1000 soldiers • Company : 150 soldiers. ERDC/CERL TR...requirements for a company outpost (COP) of 120 personnel (PAX) in the format that the computer tool generates. This tool generates a basic sus...facilities world-wide through several large contractors. One contractor, Kellogg , Brown, and Root (KBR), used a minimum planning factor of 18.4

  1. Analysis of Private Sector Care Reform Authorities and Savings

    DTIC Science & Technology

    2016-12-01

    contractors/carriers offering competing health plans in a given market area. This attribute is key to ensuring the carriers focus on the preferences of...contractor to compete and evolve its suite of tools as the market changes and conditions vary across markets . Many federal (civilian) healthcare...PSC would target the contracting mechanisms DoD uses to purchase PSC and the incentives within healthcare markets that these contracting mechanisms

  2. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  3. 48 CFR 807.300 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope of subpart. 807.300 Section 807.300 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 807.300 Scope of subpart...

  4. 48 CFR 807.300 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope of subpart. 807.300 Section 807.300 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 807.300 Scope of subpart...

  5. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  6. Apollo experience report: Guidance and control systems. Engineering simulation program

    NASA Technical Reports Server (NTRS)

    Gilbert, D. W.

    1973-01-01

    The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

  7. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  8. Expert Meeting Report: HVAC Fault Detection, Diagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  9. Expert Meeting Report: HVAC Fault Detection, DIagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  10. Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits

    DTIC Science & Technology

    2013-03-07

    performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors

  11. Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrads, T.J.

    1997-09-12

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less

  12. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

    NASA Technical Reports Server (NTRS)

    Dorman, Lane

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

  13. 48 CFR 1509.502 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.502 Applicability. This... applies to contracts with the Small Business Administration (SBA) under the 8(a) program. ...

  14. 75 FR 76345 - Risk Reduction Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Management Plan Each RRPP must include a Fatigue Management Plan (FMP) that will be designed to reduce the... organizations to develop voluntary proactive safety programs designed to improve railroad safety and build... contractors. A railroad's RRPP may be required to specify how the railroad will periodically review the design...

  15. Benefit Analysis of SPC Panel SP-10 Projects

    DTIC Science & Technology

    1995-12-01

    started by stating the definition of Flexible Automation as: “The combination of reprogrammable single and multi- functional manipulators and fixed...shipyards (like the automobile industry) for them to put a plan together, hence the need for a consultant or contractor. To-assist the developing a plan

  16. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  17. 48 CFR 52.212-5 - Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)). (2) 52.233-3, Protest After Award (AUG 1996...), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than... indicated below, the extent of the flow down shall be as required by the clause— (i) 52.203-13, Contractor...

  18. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  19. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  20. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  1. 76 FR 70977 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... Intelligence. DSS functions and responsibilities include the administration and implementation of the Defense... will be handled and marked ``For Official Use Only.'' Affected Public: Businesses, universities... will promote the implementation of the NISP. Contractors operating under DoD security cognizance are...

  2. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  3. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  4. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  5. 43 CFR 417.1 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN CONTRACTORS... methods for implementing Colorado River water conservation measures on Indian Reservations will be in... for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations...

  6. Lessons learned : pavement marking warranty contract.

    DOT National Transportation Integrated Search

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  7. Disaster Response and Planning for Libraries.

    ERIC Educational Resources Information Center

    Kahn, Miriam B.

    Providing a customized disaster response plan to assist libraries in quick recovery, this resource also outlines step to minimize damage and protect materials before trouble strikes. The first section of the book, "Response," contains information how to handle small jobs in-house and suggestions for working with contractors--with an…

  8. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  9. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  10. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  11. A cost effective bioremediation strategy using low technology resources for reclamation of dry land hydrocarbon contamination: A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robb, A.J. III; Hoggatt, P.R.

    Hydrocarbon containing soil was bioremediated at a combination wastewater and slop oil skim evaporation pond utilizing cost effective low technology resources. Fluids and sludge from the football field-sized pond were extraction procedure toxicity and purgeable organics tested, and total petroleum hydrocarbon (TPH) concentrations determined. An impact risk analysis was performed, and a corrective action plan developed and implemented. The three year project was closely coordinated with the Kansas Corporation Commission (KCC) and the Kansas Department of Health and Environment (KDHE) who established the closure level. The impacted soils at the pond were completely excavated and closure was immediately granted bymore » KDHE for the excavated area. The 24,000 cubic yards of excavated soil were then surface spread on adjacent Mobil property. A nutrient and microbial base was applied to bioaugment the soil. The preapplication land surface and the subsequently land farmed soil was periodically disced and chiseled. A job safety plan including industrial hygiene measures to eliminate workforce exposure was developed and implemented. The final remediation cost analysis amounts to $1.48 per cubic yard compared to the $30 to $150 per cubic yard industry o estimates for similar projects. Several factors were critical in ailing costs to remain so low: (1) assessment and implementation by local in-house staff, (2) conservative remedial action plan and sampling strategy; (3) local contractors; (4) locally available soil amendment; and (5) effective regulatory coordination. The methods described can be used to cost effectively characterize and bioremediate other sites where hydrocarbon-impacted soils exist in similar dry-land environments.« less

  12. 48 CFR 1605.000 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS 1605.000.... Eligible contractors (i.e., qualified health benefits carriers) are identified in accordance with 5 U.S.C...

  13. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  14. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...

  15. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...

  16. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...

  17. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...

  18. Plutonium inventories for stabilization and stabilized materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, A.K.

    1996-05-01

    The objective of the breakout session was to identify characteristics of materials containing plutonium, the need to stabilize these materials for storage, and plans to accomplish the stabilization activities. All current stabilization activities are driven by the Defense Nuclear Facilities Safety Board Recommendation 94-1 (May 26, 1994) and by the recently completed Plutonium ES&H Vulnerability Assessment (DOE-EH-0415). The Implementation Plan for accomplishing stabilization of plutonium-bearing residues in response to the Recommendation and the Assessment was published by DOE on February 28, 1995. This Implementation Plan (IP) commits to stabilizing problem materials within 3 years, and stabilizing all other materials withinmore » 8 years. The IP identifies approximately 20 metric tons of plutonium requiring stabilization and/or repackaging. A further breakdown shows this material to consist of 8.5 metric tons of plutonium metal and alloys, 5.5 metric tons of plutonium as oxide, and 6 metric tons of plutonium as residues. Stabilization of the metal and oxide categories containing greater than 50 weight percent plutonium is covered by DOE Standard {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides{close_quotes} December, 1994 (DOE-STD-3013-94). This standard establishes criteria for safe storage of stabilized plutonium metals and oxides for up to 50 years. Each of the DOE sites and contractors with large plutonium inventories has either started or is preparing to start stabilization activities to meet these criteria.« less

  19. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  20. 48 CFR 2009.470 - Appeals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.470 Appeals. A... for Operations. A copy of the notice of appeal must be furnished to the debarring/suspending official. ...

  1. 48 CFR 211.273-2 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 211.273... representatives of the contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and...

  2. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-01

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  3. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-19

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  4. The 1985 National Aeronautics and Space Administration's Summer High School Apprenticeship Research Program (SHARP)

    NASA Technical Reports Server (NTRS)

    1985-01-01

    In 1985, a total of 126 talented high school students gained first hand knowledge about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the sixth year of operation for NASA's Summer High School Apprenticeship Research Program (SHARP). The major priority of maintaining the high standards and success of prior years was satisfied. The following eight sites participated in the Program: Ames Research Center, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallop Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center. Tresp Associates served as the SHARP contractor and worked closely with NASA staff at headquarters and the sites just mentioned to plan, implement, and evaluate the program.

  5. Examining Adoption of e-Procurement in Public Sector Using the Perceived Characteristics of Innovating: Indonesian Perspective

    NASA Astrophysics Data System (ADS)

    Wahid, Fathul

    This study aims to examine factors affecting adoption of e-procurement in public sector with special reference to Indonesian context. The Perceived Characteristics of Innovating defined by Moore and Benbasat [1] used as the framework. Based on a survey to 87 contractors/suppliers in the city of Yogyakarta, the study finds that only trialability that affects use intention of e-procurement among the contractors/suppliers. The survey conducted in the early stage of e-procurement implementation is of the possible explanations. Government policy that forces the contractors/suppliers to use the e-procurement also partakes in this context. Practical implication of the findings are also discussed in the paper.

  6. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...

  7. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...

  8. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...

  9. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...

  10. 48 CFR 209.570-1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts... clause at 252.209-7007, Prohibited Financial Interests for Lead System Integrators. See PGI 209.570-1 for...

  11. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  12. Contracting for Asbestos Abatement: What You Need to Know.

    ERIC Educational Resources Information Center

    Bittle, Edgar H.; McAllister, Jane B.

    1990-01-01

    School districts are required to determine if asbestos-containing materials exist at school facilities and design and implement asbestos abatement. Reviews how to select a contractor, draft the contract, and ensure its proper implementation by complying with the law and avoiding liability. (MLF)

  13. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less

  14. 48 CFR 3409.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of... performance to be in the best interest of the Federal government. (b) The HCA is designated as the official to...

  15. 48 CFR 1309.407-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1309.407-1 General... forth in CAM 1301.70 states in writing compelling reasons for continuing to do business with a suspended...

  16. Asbestos: No Easy Solutions.

    ERIC Educational Resources Information Center

    Figlio, Mary Ellen

    1979-01-01

    Asbestos in the schools has become a serious problem. Current activity in inspecting for asbestos and plans for corrective action are discussed. Suggestions are offered administrators in choosing contractors for asbestos removal. (MLF)

  17. 48 CFR 3452.208-72 - Paperwork Reduction Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... If the contractor will collect information requiring answers to identical questions from 10 or more people, no plan, questionnaire, interview guide, or other similar device for collecting information may...

  18. 48 CFR 3452.227-71 - Paperwork Reduction Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government. If the contractor will collect information requiring answers to identical questions from 10 or more people then no plan, questionnaire, interview guide, or other similar device for collecting...

  19. Space Station: NASA's software development approach increases safety and cost risks. Report to the Chairman, Committee on Science, Space, and Technology, House of Representatives

    NASA Astrophysics Data System (ADS)

    1992-06-01

    The House Committee on Science, Space, and Technology asked NASA to study software development issues for the space station. How well NASA has implemented key software engineering practices for the station was asked. Specifically, the objectives were to determine: (1) if independent verification and validation techniques are being used to ensure that critical software meets specified requirements and functions; (2) if NASA has incorporated software risk management techniques into program; (3) whether standards are in place that will prescribe a disciplined, uniform approach to software development; and (4) if software support tools will help, as intended, to maximize efficiency in developing and maintaining the software. To meet the objectives, NASA proceeded: (1) reviewing and analyzing software development objectives and strategies contained in NASA conference publications; (2) reviewing and analyzing NASA, other government, and industry guidelines for establishing good software development practices; (3) reviewing and analyzing technical proposals and contracts; (4) reviewing and analyzing software management plans, risk management plans, and program requirements; (4) reviewing and analyzing reports prepared by NASA and contractor officials that identified key issues and challenges facing the program; (5) obtaining expert opinions on what constitutes appropriate independent V-and-V and software risk management activities; (6) interviewing program officials at NASA headquarters in Washington, DC; at the Space Station Program Office in Reston, Virginia; and at the three work package centers; Johnson in Houston, Texas; Marshall in Huntsville, Alabama; and Lewis in Cleveland, Ohio; and (7) interviewing contractor officials doing work for NASA at Johnson and Marshall. The audit work was performed in accordance with generally accepted government auditing standards, between April 1991 and May 1992.

  20. Kennedy Space Center Five Year Sustainability Plan

    NASA Technical Reports Server (NTRS)

    Williams, Ann T.

    2016-01-01

    The Federal Government is committed to following sustainable principles. At its heart, sustainability integrates environmental, societal and economic solutions for present needs without compromising the ability of future generations to meet their needs. Building upon its pledge towards environmental stewardship, the Administration generated a vision of sustainability spanning ten goals mandated within Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade. In November 2015, the National Aeronautics and Space Administration (NASA) responded to this EO by incorporating it into a new release of the NASA Strategic Sustainability Performance Plan (SSPP). The SSPP recognizes the importance of aligning environmental practices in a manner that preserves, enhances and strengthens NASA's ability to perform its mission indefinitely. The Kennedy Space Center (KSC) is following suit with KSC's Sustainability Plan (SP) by promoting, maintaining and pioneering green practices in all aspects of our mission. KSC's SP recognizes that the best sustainable solutions use an interdisciplinary, collaborative approach spanning civil servant and contractor personnel from across the Center. This approach relies on the participation of all employees to develop and implement sustainability endeavors connected with the following ten goals: Reduce greenhouse gas (GHG) emissions. Design, build and maintain sustainable buildings, facilities and infrastructure. Leverage clean and renewable energy. Increase water conservation. Improve fleet and vehicle efficiency and management. Purchase sustainable products and services. Minimize waste and prevent pollution. Implement performance contracts for Federal buildings. Manage electronic equipment and data centers responsibly. Pursue climate change resilience. The KSC SP details the strategies and actions that address the following objectives: Reduce Center costs. center dot Increase energy and water efficiencies. Promote smart buying practices. Increase reuse and recycling while decreasing waste. Benefit the community. Meet or exceed the EO and NASA SSPP sustainability goals.

  1. Space station automation and robotics study. Operator-systems interface

    NASA Technical Reports Server (NTRS)

    1984-01-01

    This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green,T.

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policymore » for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.« less

  3. Critical factors of implementing Industrialised Building System in Sarawak: A research on SMEs

    NASA Astrophysics Data System (ADS)

    Hadi, N. A.; Muhamad, W. M. N. W.; Othman, M. K. F.

    2017-05-01

    Industrialised Building System (IBS) have been adopted in Malaysia for over five decades and is expected to grow consistent with Malaysia's economic development. In promoting the adoption of IBS in construction projects, the government has taken several steps such as levy exemption for contractors and developers. Despite its numerous advantages and efforts pulled by the government, the implementation and adoption of IBS are still below the expected figure. Many researchers investigated readiness, setbacks and issues related to the implementation of IBS in Malaysia's construction projects. However, most of the research mainly for projects located in urban areas of West Malaysia. Therefore, this paper aims to close the gap on factors affecting the implementation of IBS for SMEs in Sarawak, where the level urbanisation is low. A semi-structured interview was conducted with 10 SME's contractors to get better insight view. The study found that logistics and infrastructure problems, a limited number of the manufacturer, lack of incentive, conventional payment methods, lack of financial supports are among critical factors affecting the implementation of IBS. Therefore, it was concluded that government plays major role in providing supports, incentives and facilitating the improvement of infrastructure to successfully implementing IBS in Sarawak.

  4. Lessons Learned for Improving Spacecraft Ground Operations

    NASA Technical Reports Server (NTRS)

    Bell, Michael; Henderson, Gena; Stambolian, Damon

    2013-01-01

    NASA policy requires each Program or Project to develop a plan for how they will address Lessons Learned. Projects have the flexibility to determine how best to promote and implement lessons learned. A large project might budget for a lessons learned position to coordinate elicitation, documentation and archival of the project lessons. The lessons learned process crosses all NASA Centers and includes the contactor community. o The Office of The Chief Engineer at NASA Headquarters in Washington D.C., is the overall process owner, and field locations manage the local implementation. One tool used to transfer knowledge between program and projects is the Lessons Learned Information System (LLIS). Most lessons come from NASA in partnership with support contractors. A search for lessons that might impact a new design is often performed by a contractor team member. Knowledge is not found with only one person, one project team, or one organization. Sometimes, another project team, or person, knows something that can help your project or your task. Knowledge sharing is an everyday activity at the Kennedy Space Center through storytelling, Kennedy Engineering Academy presentations and through searching the Lessons Learned Information system. o Project teams search the lessons repository to ensure the best possible results are delivered. o The ideas from the past are not always directly applicable but usually spark new ideas and innovations. Teams have a great responsibility to collect and disseminate these lessons so that they are shared with future generations of space systems designers. o Leaders should set a goal for themselves to host a set numbers of lesson learned events each year and do more to promote multiple methods of lessons learned activities. o High performing employees are expected to share their lessons, however formal knowledge sharing presentation are not the norm for many employees.

  5. 75 FR 81278 - Medicare Program: Solicitation of Comments Regarding Development of a Recovery Audit Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Director.) Specific conflict of interest rules that should apply to RACs for the Medicare Parts C and D... Remuneration (DIR). The DIR information reported by plans includes rebates paid by pharmaceutical manufacturers, as well as other remuneration received by the plan that has the effect of reducing their drug costs...

  6. Flying a College on the Computer. The Use of the Computer in Planning Buildings.

    ERIC Educational Resources Information Center

    Saint Louis Community Coll., MO.

    Upon establishment of the St. Louis Junior College District, it was decided to make use of computer si"ulation facilities of a nearby aero-space contractor to develop a master schedule for facility planning purposes. Projected enrollments and course offerings were programmed with idealized student-teacher ratios to project facility needs. In…

  7. 76 FR 78383 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Rates for Local Exchange Carriers; High-Cost Universal Service Support; Proposed Rule #0;#0;Federal... Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost... duplicating contractor, Best Copy and Printing, Inc., 445 12th Street SW., Room CY- B402, Washington, DC 20554...

  8. Planning for Safety on the Jobsite. Safety in Industry, Construction Industry Series.

    ERIC Educational Resources Information Center

    Occupational Safety and Health Administration, Washington, DC.

    Work injuries and their monetary losses in the construction industry can be effectively prevented only through an aggressive and well-planned safety effort. The purpose of this bulletin is to provide guidelines to aid the construction contractor in complying with legal requirements and in attaining the objective of keeping costly accidents and…

  9. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  10. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  11. 25 CFR 170.473 - What happens when a construction project ends?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...

  12. Trends in Education.

    ERIC Educational Resources Information Center

    School Planning & Management, 2002

    2002-01-01

    Several architects, planners, administrators, and contractors answer questions about trends related to school construction, interior design, business, security, and technology. Trends concern funding issues, specialized designs, planning for safety, technological integration, and equity in services. (EV)

  13. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DAVIES, T.H.

    2002-10-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan ofmore » Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.« less

  14. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  15. Thoughts on Earned Value Assessments

    NASA Technical Reports Server (NTRS)

    Pido, Kelle

    2009-01-01

    This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

  16. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  17. Using Heuristics for Supportability Analysis of Adaptive Weapon Systems in Combat

    DTIC Science & Technology

    2017-01-01

    a n/a Customer Requirements Im p o rt an ce w ei g ht f ac to r F o rc e to o p en E xt er na l d im en si o ns C D p o si ti o ni ng f ea tu...usually include Contractor Logistics Support (CLS), and the contract structure normally incentivizes CLS to exceed the KPP Operational Readiness...adaptive baseline, a viable plan for maximizing availability and reducing costs would involve an early design effort for replacing contractor maintenance

  18. Program Manager: Journal of the Defense Systems Management College. Volume 19, Number 5, September-October 1990

    DTIC Science & Technology

    1990-10-01

    International Defense Cooperation Agreements; Quality Force Deployment; How Contractors See Systems Acquisition; DOD Metric Transition Plans and Actions; Proposals for Innovation In Service Quality . (sdw)

  19. 23 CFR 450.310 - Metropolitan planning organization designation and redesignation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... staff resources of other agencies, non-profit organizations, or contractors to carry out selected... serves a TMA; or (4) Periodic rotation of members representing units of general-purpose local government...

  20. 48 CFR 2009.570 - NRC organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... conflicts of interest. 2009.570 Section 2009.570 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570 NRC organizational conflicts of interest. ...

  1. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    PubMed

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  2. Evaluation of the Trajectory Operations Applications Software Task (TOAST). Volume 2: Interview transcripts

    NASA Technical Reports Server (NTRS)

    Perkins, Sharon; Martin, Andrea; Bavinger, Bill

    1990-01-01

    The Trajectory Operations Applications Software Task (TOAST) is a software development project whose purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle. The purpose of the evaluation was to evaluate TOAST as an Application Manager - to assess current and planned capabilities, compare capabilities to commercially-available off the shelf (COTS) software, and analyze requirements of MCC and Flight Analysis Design System (FADS) for TOAST implementation. As a major part of the data gathering for the evaluation, interviews were conducted with NASA and contractor personnel. Real-time and flight design users, orbit navigation users, the TOAST developers, and management were interviewed. Code reviews and demonstrations were also held. Each of these interviews was videotaped and transcribed as appropriate. Transcripts were edited and are presented chronologically.

  3. Summer High School Apprenticeship Research Program (SHARP) of the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    1984-01-01

    A total of 125 talented high school students had the opportunity to gain first hand experience about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the fifth year of operation for NASA's Summer High School Apprenticehsip Research Program (SHARP). Ferguson Bryan served as the SHARP contractor and worked closely with NASA staff at Headquarters and the eight participating sites to plan, implement, and evaluate the Program. The main objectives were to strengthen SHARP and expand the number of students in the Program. These eight sites participated in the Program: Ames Research Center North, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallops Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center.

  4. GBI assessment checklist: Level of awareness of the contractors in the Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Marhani, M. A.; Muksain, M. A. S.

    2018-02-01

    Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.

  5. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  6. Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    The US Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1113) for the proposed lease of 957.16 acres of the Oak Ridge Reservation (ORR) to the East Tennessee Economic Council (ETEC), a non-profit community organization, for a period of 10 years, with an option for renewal. ETEC proposes to develop an industrial park on the leased site to provide employment opportunities for DOE and contractor employees affected by decreased federal funding. Based on the results of the analysis reported in the EA and implementation of mitigation measures defined in this Finding of No Significant Impact (FONSI), DOE has determinedmore » that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this mitigated FONSI. DOE will implement a Mitigation Action Plan for this project and provide annual reports on mitigation and monitoring.« less

  7. Audit of Mound Plant`s reduction in force

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-17

    Objective of this audit was to determine whether the Mound Plant`s Fiscal Year 1992 reduction in force (RIF) was effectively managed and implemented properly by DOE. DOE established policy to encourage contractors to reduce staffing by voluntary separations without unreasonable separation costs. EG&G Mound`s FY 1992 RIF was accomplished by voluntary separations; however, its implementation unreasonably increased costs because DOE did not have adequate criteria or guidelines for evaluating contractors` RIF proposals, and because EG&G Mound furnished inaccurate cost data to DOE evaluators. The unreasonable costs amounted to at least $21 million. Recommendations are made that DOE develop and implementmore » guidelines to impose limitations on voluntary separation allowances, early retirement incentive payments, and inclusion of crucial employee classifications in voluntary RIFs.« less

  8. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  9. Best Practices for Optimizing DoD Contractor Safety and Occupational Health Program Performance

    DTIC Science & Technology

    2012-12-01

    such as Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), Quality Assurance Surveillance Plans (QASP), etc. Contract administration...technology support, medical , and maintenance of equipment and facilities. The DoD Guidebook for the Acquisition of Services, provides acquisition...OSHA regulations and perform in accordance with an applicable accident prevention program that complies with State and Federal requirements. The

  10. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ...://parkplanning.nps.gov/THRO ); click on the link to Elk Management Plan/ EIS. You may also obtain a copy of the.... The Park would not pay private contractors or outside individuals to shoot elk. The initial reduction..., by removing approximately 275 elk per year. Following the initial reduction phase, the Park would...

  11. Enhancing the Delivery of Supplemental Nutrition Assistance Program Education through Geographic Information Systems

    ERIC Educational Resources Information Center

    Stone, Matthew

    2011-01-01

    The Network for a Healthy California (Network) employs a Geographic Information System (GIS) to identify the target audience and plan program activities because GIS is a powerful tool for assisting in data integration and planning. This paper describes common uses of GIS by Network contractors as well as demonstrating the possibilities of GIS as a…

  12. 48 CFR 1609.7101 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy. 1609.7101 Section 1609.7101 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Performance...

  13. 48 CFR 1609.7101 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy. 1609.7101 Section 1609.7101 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Performance...

  14. 75 FR 35451 - Access by EPA Contractors To Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... further extensions without further notice. Under Contract Number EP10H000097, Computer Science Corporation... EPA procedures, including comprehensive system security plans (SSPs) that are consistent with those...

  15. 48 CFR 3009.108-7005 - Clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...

  16. 48 CFR 3009.108-7005 - Clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...

  17. 48 CFR 3009.108-7005 - Clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...

  18. 48 CFR 3009.108-7005 - Clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...

  19. 48 CFR 3009.108-7005 - Clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...

  20. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    NASA Astrophysics Data System (ADS)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  1. 48 CFR 2809.402 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...

  2. 48 CFR 2809.402 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...

  3. 48 CFR 2809.402 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...

  4. 48 CFR 3009.171-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false General. 3009.171-1 Section 3009.171-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible...

  5. 48 CFR 2009.570-4 - Representation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... type required by the organizational conflicts of interest representation provisions has previously been... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-4 Representation... whether situations or relationships exist which may constitute organizational conflicts of interest with...

  6. 48 CFR 2509.403 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definitions. 2509.403 Section 2509.403 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2509.403 Definitions. The NSF Deputy...

  7. 48 CFR 3409.502 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Applicability. 3409.502 Section 3409.502 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.502...

  8. 48 CFR 3409.503 - Waiver.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Waiver. 3409.503 Section 3409.503 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.503...

  9. 48 CFR 3409.507 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3409.507 Section 3409.507 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.507...

  10. 48 CFR 3409.570 - Offeror certification provision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Offeror certification provision. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts...

  11. 48 CFR 3409.406 - Debarment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Debarment. 3409.406 Section 3409.406 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...

  12. 48 CFR 3409.403 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false [Reserved] 3409.403 Section 3409.403 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...

  13. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  14. Dollar Summary of Prime Contract Awards by Contractor, State or Country, and Place, FY83, Part 2 (Gillespie Delorenzo Asla & Assocs-Planning Analysis Corp).

    DTIC Science & Technology

    1983-01-01

    BUILDERS INC WRIGHT PATTERSON AFS OHIO 202 202 263 202 a LOCKHART WILLIAM M CORP SAN DIEGO CALIFORNIA 125 125 125 125 LOCKHEED AIRCRAFT SERVICE CO ONTARIO...THOUSANDS) CONTRACTOR CITY STATE AGGREGATE ARMY NAVY AIR FORCE DLA OCE LORENZ a WILLIAMS INC WRIGHT PATTERSON AFB OHIO 021 821 821 821 LORENZ BEN ASSOCIATES...MONMOUTH NEW JERSEY 32 32 GIULIANI CONTRACTING CO MCGUIRE AFB NEW JERSEY 158 158 258 100 158 GIVENS ULTIMATE SERVICES INC WRIGHT PATTERSON AFB OHIO 194 194

  15. Red Plague Control Plan (RPCP)

    NASA Technical Reports Server (NTRS)

    Cooke, Robert W.

    2010-01-01

    SCOPE: Prescribes the minimum requirements for the control of cuprous / cupric oxide corrosion (a.k.a. Red Plague) of silver-coated copper wire, cable, and harness assemblies. PURPOSE: Targeted for applications where exposure to assembly processes, environmental conditions, and contamination may promote the development of cuprous / cupric oxide corrosion (a.k.a. Red Plague) in silver-coated copper wire, cable, and harness assemblies. Does not exclude any alternate or contractor-proprietary documents or processes that meet or exceed the baseline of requirements established by this document. Use of alternate or contractor-proprietary documents or processes shall require review and prior approval of the procuring NASA activity.

  16. 24 CFR 3500.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., promotes, or rewards other employees or independent contractors, or is in a position to formulate... issued by the Board of Governors of the Federal Reserve System (12 CFR part 226) to implement the Federal...

  17. A BIM-based system for demolition and renovation waste estimation and planning.

    PubMed

    Cheng, Jack C P; Ma, Lauren Y H

    2013-06-01

    Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.

  18. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene; Rehfeldt, Kenneth

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  19. 75 FR 82091 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    .... The title of the information collection: 10 CFR Part 26, ``Fitness for Duty Programs.'' 3. Current OMB...; and all contractor/ vendors (C/V) who implement fitness-for-duty (FFD) programs or program elements to... in 10 CFR part 26 prescribe requirements to establish, implement, and maintain fitness-for-duty...

  20. Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

  1. Features of the marketing strategy of oil and gas companies in exploration drilling

    NASA Astrophysics Data System (ADS)

    Sharf, I.; Malanina, V.; Kamynina, L.

    2014-08-01

    The implementation of national and regional programs for the development of new oil and gas provinces of Eastern Siberia poses the challenge of increasing geological exploration. The current drilling service companies' market structure, as well as the strategic task of search and exploration effectiveness requires qualitatively new approaches for choosing a contractor. The proposed strategy to select a contractor based on comprehensive analysis of certain groups of industrial, financial, infrastructural criteria allows not only to optimize the costs of exploration activities, but also to minimize preventively the risks of a poor geological exploration. The authors' SWOT- analysis of the marketing strategy of "Gazprom neft" for choosing a contractor outlined the problem of imperfection of the Russian legislation in the sphere of activities of service companies in the oil and gas sector.

  2. 48 CFR 2909.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Procedures. 2909.506 Section 2909.506 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 2909.506 Procedures. (a) If a...

  3. 48 CFR 9.701 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...

  4. 48 CFR 9.701 - Definition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...

  5. 48 CFR 9.701 - Definition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...

  6. 48 CFR 9.701 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...

  7. 48 CFR 9.701 - Definition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...

  8. 48 CFR 609.202 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Policy. 609.202 Section 609.202 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Qualifications Requirements 609.202 Policy. The authority prescribed in...

  9. 48 CFR 3009.570-2 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant... took appropriate steps to prevent any organizational conflict of interest in the selection process; or... process over which the entity exercised no control. (c) CONSTRUCTION—Nothing in this section 3009.570...

  10. Outsourcing Support Services.

    ERIC Educational Resources Information Center

    McClure, James A.

    2000-01-01

    Successful outsourcing is a learning process demanding careful planning, commitment, and heavy communication. The process also requires a strong leadership and a cohesive school board ready to weather a cultural change. Service employee options, contractors' managerial expertise, increased efficiency, and partnership opportunities are possible…

  11. KY-CTDS : Kentucky contract time determination system

    DOT National Transportation Integrated Search

    2000-06-30

    This research project was to update the KyTC's planning tool used for the determination of contract time allotted for contractors to complete highway construction projects in the Commonwealth of Kentucky. Although this issue was initially raised by t...

  12. 18 CFR 50.5 - Pre-filing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ELECTRIC TRANSMISSION FACILITIES § 50.5 Pre-filing procedures. (a) Introduction. Any applicant seeking a... consultations, project engineering, route planning, environmental and engineering contractor engagement... proceeding. This description also must include the identification of the environmental and engineering firms...

  13. 48 CFR 9.304 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Exceptions. 9.304 Section 9.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.304 Exceptions. Normally, testing and approval...

  14. 48 CFR 3009.570-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3009.570-3 Section 3009.570-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and...

  15. 48 CFR 3409.406-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3409.406-3 Section 3409.406-3 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...

  16. Structural Design Requirements and Factors of Safety for Spaceflight Hardware: For Human Spaceflight. Revision A

    NASA Technical Reports Server (NTRS)

    Bernstein, Karen S.; Kujala, Rod; Fogt, Vince; Romine, Paul

    2011-01-01

    This document establishes the structural requirements for human-rated spaceflight hardware including launch vehicles, spacecraft and payloads. These requirements are applicable to Government Furnished Equipment activities as well as all related contractor, subcontractor and commercial efforts. These requirements are not imposed on systems other than human-rated spacecraft, such as ground test articles, but may be tailored for use in specific cases where it is prudent to do so such as for personnel safety or when assets are at risk. The requirements in this document are focused on design rather than verification. Implementation of the requirements is expected to be described in a Structural Verification Plan (SVP), which should describe the verification of each structural item for the applicable requirements. The SVP may also document unique verifications that meet or exceed these requirements with NASA Technical Authority approval.

  17. Industry liaison section implementation plan

    NASA Technical Reports Server (NTRS)

    Lakowske, Stephen

    1990-01-01

    The Industry Liaison Section is a new function of the Army/NASA Aircrew-Aircraft Integration (AAAI) Program that is intended to bridge an existing gap between Government developers (including contractors) and outside organizations who are potential users of products and services developed by the AAAI Program. Currently in its sixth year, the Program is experiencing considerable pull from industry and other government organizations to disseminate products. Since the AAAI Program's charter is exploratory and research in nature, and satisfying proper dissemination requirements is in conflict with the rapid prototyping approach utilized by the design team, the AAAI Program has elected to create an Industry Liaison Section (ILS) to serve as the Program's technology transfer focal point. The process by which the ILS may be established, organized and managed is described, including the baseline organizational structure, duties, functions, authority, responsibilities, relations and policies and procedures relevant to the conduct of the ILS.

  18. A self-reliant RSI payload development in Taiwan

    NASA Astrophysics Data System (ADS)

    Weng, Shui-Lin; Lian, Yu-Yung

    2011-10-01

    Instead of outsourcing the whole FORMOSAT-2 satellite to a foreign prime contractor, the National Space Organization in Taiwan is stepping ahead to take the full responsibility of consolidating self-reliant space technology capabilities. A newly initiated program FORMOSAT-5 satellite, not only to build a heritage design of a spacecraft bus but also, selfreliantly, to leap a big step toward Remote Sensing Instrument payload development, is sailing on its voyage. Among the payload development effort, an integrated circuit of the kind Complementary Metal Oxide Semiconductor instead of Charge-coupled Device is chosen as the image sensor playing the lead role for the instrument. Despite the foreseen technical concerns, management issues over scheduling and documentation are constantly emerging owing to the payload development underwent is collaborated by several domestic industries and research centers. Regardless of challenges we may confront with, a carefully planned strategy especially emphasizing on the product realization processes is considered, discussed, and implemented.

  19. Health, safety, and environmental management system operation in contracting companies: A case study.

    PubMed

    Nassiri, Parvin; Yarahmadi, Rasoul; Gholami, Pari Shafaei; Hamidi, Abdolamir; Mirkazemi, Roksana

    2016-05-03

    Systematic and cooperative interactions among parent industry and contractors are necessary for a successful health, safety, and environmental management system (HSE-MS). This study was conducted to evaluate the HSE-MS performance in contracting companies in one of the petrochemical industries in Iran during 2013. Managers of parent and contracting companies participated in this study. The data collection forms included 7 elements of an integrated HSE-MS (leadership and commitment; policy and strategic objectives; organization, resources, and documentation; evaluation and risk management; planning; implementation and monitoring; auditing and reviewing). The results showed that mean percentage of the total scores in seven elements of HSE-MS was 85.7% and 87.0% based on self-report and report of parent company, respectively. In conclusion, this study showed that HSE-MS was desirably functioning; however, improvement to ensure health and safety of workers is still required.

  20. Report on the Loss of the Mars Polar Lander and Deep Space 2 Missions

    NASA Technical Reports Server (NTRS)

    Albee, Arden; Battel, Steven; Brace, Richard; Burdick, Garry; Casani, John; Lavell, Jeffrey; Leising, Charles; MacPherson, Duncan; Burr, Peter; Dipprey, Duane

    2000-01-01

    NASA's Mars Surveyor Program (MSP) began in 1994 with plans to send spacecraft to Mars every 26 months. Mars Global Surveyor (MGS), a global mapping mission, was launched in 1996 and is currently orbiting Mars. Mars Surveyor '98 consisted of Mars Climate Orbiter (MCO) and Mars Polar Lander (MPL). Lockheed Martin Astronautics (LMA) was the prime contractor for Mars Surveyor '98. The Jet Propulsion Laboratory (JPL), California Institute of Technology, manages the Mars Surveyor Program for NASA's Office of Space Science. MPL was developed under very tight funding constraints. The combined development cost of MPL and MCO, including the cost of the two launch vehicles, was approximately the same as the development cost of the Mars Pathfinder mission, including the cost of its single launch vehicle. The MPL project accepted the challenge to develop effective implementation methodologies consistent with programmatic requirements.

  1. Human Factors Checklist: Think Human Factors - Focus on the People

    NASA Technical Reports Server (NTRS)

    Miller, Darcy; Stelges, Katrine; Barth, Timothy; Stambolian, Damon; Henderson, Gena; Dischinger, Charles; Kanki, Barbara; Kramer, Ian

    2016-01-01

    A quick-look Human Factors (HF) Checklist condenses industry and NASA Agency standards consisting of thousands of requirements into 14 main categories. With support from contractor HF and Safety Practitioners, NASA developed a means to share key HF messages with Design, Engineering, Safety, Project Management, and others. It is often difficult to complete timely assessments due to the large volume of HF information. The HF Checklist evolved over time into a simple way to consider the most important concepts. A wide audience can apply the checklist early in design or through planning phases, even before hardware or processes are finalized or implemented. The checklist is a good place to start to supplement formal HF evaluation. The HF Checklist was based on many Space Shuttle processing experiences and lessons learned. It is now being applied to ground processing of new space vehicles and adjusted for new facilities and systems.

  2. Proceedings of the Department of Energy ALARA Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Baum, J.W.

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.« less

  3. Recovery audits are back: tactics for tough times.

    PubMed

    Cascardo, Debra

    2010-01-01

    The Recovery Audit Contractor (RAC) Program was implemented in stages in 2009. Section 302 of the Tax Relief and Health Care Act of 2006 required full implementation no later than January 1, 2010. The first phase began in March 2009 and covered various states; the second phase began in August 2009. The Centers for Medicare & Medicaid Services is gradually implementing the RAC permanent program, and it will ultimately affect every provider in every state.

  4. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  5. Specific Barriers and Drivers in Different Stages of Decision-Making about Energy Efficiency Upgrades in Private Homes

    PubMed Central

    Klöckner, Christian A.; Nayum, Alim

    2016-01-01

    Energy efficiency upgrades of privately owned homes like adding to the insulation layers in the walls, roof or floor, or replacing windows with more efficiently insulated versions can contribute significantly to reducing the energy impact of the building sector and thus also the CO2 footprint of a household. However, even in countries like Norway that have a rather high rate of renovation, energy upgrades are not always integrated into such a refurbishment project. This study tests which structural and internal psychological barriers hinder and which drivers foster decision-making to implement such measures, once a renovation project is planned. With a theoretical background in stage-based models of decision-making 24 barriers and drivers were tested for their specific effect in the stages of decision-making. The four stages of decision-making assumed in this study were (1) “not being in a decision mode,” (2) “deciding what to do,” (3) “deciding how to do it,” and (4) “planning implementation.” Based on an online survey of 3787 Norwegian households, it was found that the most important barriers toward deciding to implement energy efficiency upgrades were not owning the dwelling and feeling the right time had not come yet. The most important drivers of starting to decide were higher expected comfort levels, better expected living conditions, and an expected reduction of energy costs. For the transition from deciding what to do to how to do it, not managing to make a decision and feeling the right point in time has not come yet were the strongest barriers, easily accessible information and an expected reduction of energy costs were the most important drivers. The final transition from deciding how to do the upgrades to planning implementation was driven by expecting a payoff within a reasonable time frame and higher expected comfort levels; the most important barriers were time demands for supervising contractors and—again—a feeling that the right point in time has not come yet. Implications for policy-making and marketing are discussed. PMID:27660618

  6. Specific Barriers and Drivers in Different Stages of Decision-Making about Energy Efficiency Upgrades in Private Homes.

    PubMed

    Klöckner, Christian A; Nayum, Alim

    2016-01-01

    Energy efficiency upgrades of privately owned homes like adding to the insulation layers in the walls, roof or floor, or replacing windows with more efficiently insulated versions can contribute significantly to reducing the energy impact of the building sector and thus also the CO2 footprint of a household. However, even in countries like Norway that have a rather high rate of renovation, energy upgrades are not always integrated into such a refurbishment project. This study tests which structural and internal psychological barriers hinder and which drivers foster decision-making to implement such measures, once a renovation project is planned. With a theoretical background in stage-based models of decision-making 24 barriers and drivers were tested for their specific effect in the stages of decision-making. The four stages of decision-making assumed in this study were (1) "not being in a decision mode," (2) "deciding what to do," (3) "deciding how to do it," and (4) "planning implementation." Based on an online survey of 3787 Norwegian households, it was found that the most important barriers toward deciding to implement energy efficiency upgrades were not owning the dwelling and feeling the right time had not come yet. The most important drivers of starting to decide were higher expected comfort levels, better expected living conditions, and an expected reduction of energy costs. For the transition from deciding what to do to how to do it, not managing to make a decision and feeling the right point in time has not come yet were the strongest barriers, easily accessible information and an expected reduction of energy costs were the most important drivers. The final transition from deciding how to do the upgrades to planning implementation was driven by expecting a payoff within a reasonable time frame and higher expected comfort levels; the most important barriers were time demands for supervising contractors and-again-a feeling that the right point in time has not come yet. Implications for policy-making and marketing are discussed.

  7. 44 CFR 63.10 - Demolition or relocation contractor to be joint payee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968 General § 63.10...

  8. 44 CFR 63.10 - Demolition or relocation contractor to be joint payee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968 General § 63.10...

  9. 44 CFR 63.10 - Demolition or relocation contractor to be joint payee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968 General § 63.10...

  10. 44 CFR 63.10 - Demolition or relocation contractor to be joint payee.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968 General § 63.10...

  11. 44 CFR 63.10 - Demolition or relocation contractor to be joint payee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968 General § 63.10...

  12. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less

  13. 48 CFR 1409.506 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... organizational conflict of interest, then the contracting officer shall refer the documentation of the potential conflict and proposed resolution prepared in accordance with 7.105(b)(18) to the HCA for approval... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506...

  14. 48 CFR 2909.503 - Waiver.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Waiver. 2909.503 Section 2909.503 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 2909.503 Waiver. (a) The Senior Procurement...

  15. 48 CFR 2009.570-4 - Representation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Representation. 2009.570-4 Section 2009.570-4 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-4 Representation...

  16. 48 CFR 908.7100 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 908.7100 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7100 Scope of subpart... contractors authorized to use special sources of supply to the extent indicated herein. ...

  17. 48 CFR 908.7106 - Security cabinets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....7106 Section 908.7106 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7106 Security...) Fixed-price prime contractors and lower tier subcontractors may use GSA acquisition sources for security...

  18. Notification: Assessment of the Qualifications of Environmental Protection Agency Personnel With Significant Security Responsibilities

    EPA Pesticide Factsheets

    Project #OMS-FY12-0006, February 15, 2012. The U.S. Environmental Protection Agency (EPA) Office of Inspector General plans to begin preliminary research for the subject project, which will be performed by a contractor.

  19. 48 CFR 909.504 - Contracting officer's responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...

  20. 48 CFR 909.504 - Contracting officer's responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...

  1. 48 CFR 9.703 - Contracting with individual pool members.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...

  2. 48 CFR 9.703 - Contracting with individual pool members.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...

  3. 48 CFR 9.703 - Contracting with individual pool members.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...

  4. 48 CFR 9.703 - Contracting with individual pool members.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...

  5. 48 CFR 9.703 - Contracting with individual pool members.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...

  6. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  7. 48 CFR 1409.403 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Definitions. 1409.403... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.403 Definitions... matters. The Office of Inspector General (OIG) may also refer actions. Conviction, for the purposes of...

  8. 48 CFR 1409.403 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Definitions. 1409.403... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.403 Definitions... matters. The Office of Inspector General (OIG) may also refer actions. Conviction, for the purposes of...

  9. 48 CFR 2009.405 - Effect of listing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Effect of listing. 2009.405 Section 2009.405 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.405 Effect of...

  10. 48 CFR 2509.405 - Effect of listing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Effect of listing. 2509.405 Section 2509.405 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2509.405 Effect of listing. ...

  11. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.23 How will Reclamation... expertise needed may include, but are not limited to, water management planning, engineering, hydrology...

  12. 48 CFR 9.202 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 9.202 Section 9.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Qualifications Requirements 9.202 Policy. (a)(1) The head of the agency or designee...

  13. 48 CFR 209.570-2 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... appropriate steps to prevent any organizational conflict of interest in the selection process; or (2) The... which the entity exercised no control. (c) In accordance with Section 802 of the National Defense...

  14. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  15. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  16. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  17. 48 CFR 9.307 - Government administration procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government administration... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.307 Government..., to the Government laboratory or other activity responsible for approval at the address specified in...

  18. 48 CFR 809.507-1 - Solicitation provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 809.507-1 Solicitation provisions. (a) While conflicts of interest may not presently exist, award of certain types of contracts may create potential future organizational conflicts of interest (see...

  19. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  20. 48 CFR 2909.405 - Effect of listing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Effect of listing. 2909.405 Section 2909.405 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2909.405 Effect of listing. (a...

  1. 48 CFR 9.307 - Government administration procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Government administration... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.307 Government..., to the Government laboratory or other activity responsible for approval at the address specified in...

  2. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  3. Summer Final Report

    NASA Technical Reports Server (NTRS)

    Makidi, Nitou

    2012-01-01

    The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

  4. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  5. Creating a competitive PSO: a case study.

    PubMed

    Calvaruso, J T

    1999-06-01

    Mount Carmel Health System, an integrated delivery system in Columbus, Ohio, became a Medicare+Choice contractor in response to unsatisfactory payment proposals from the Medicare contractors it serviced and to compete with the increasing number of managed care providers in its market. To meet HCFA's operational requirements, Mount Carmel upgraded and expanded its administrative and health information systems and solicited the support of its network physicians. It also developed a marketing strategy to promote its health plan. In the two years after instituting its provider-sponsored organization, Mount Carmel surpassed its original enrollment projections, decreased its patient management and utilization costs, and increased payments to its network members.

  6. Langley's Space Shuttle Technology: A bibliography

    NASA Technical Reports Server (NTRS)

    Champine, G. R.

    1981-01-01

    This bibliography documents most of the major publications, research reports, journal articles, presentations, and contractor reports, which have been published since the inception of the Space Shuttle Technology Task Group at the NASA Langley Reseach Center on July 11, 1969. This research work was performed in house by the Center staff or under contract, monitored by the Center staff. The report is arranged according to method of publication: (1) NASA Formal Reports; (2) Contractor Reports; and (3) Articles and Conferences. Disciplines covered are in the areas of aerothermodynamics, structures, dynamics and aeroelasticity, environmental, and materials. The publications are listed without abstracts for quick reference and planning.

  7. Insurance and indemnification implications of future space projects

    NASA Technical Reports Server (NTRS)

    O'Brien, John E.

    1987-01-01

    NASA options regarding insurance and indemnification policies as they relate to NASA customers and contractors are described. The foundation for the discussion is the way in which NASA is planning to return the Space Shuttle fleet to safe flight as well as current U.S. policy concerning future uses of the Shuttle fleet. Issues discussed include: the nature of the Shuttle manifest; the policy regarding property damage or destruction; insurance against liability to third parties; the reduction of the scope of the risk to be insured; NASA as the insurer; a sharing arrangement between the user and NASA; and contractors and subcontractors involved in Shuttle operations.

  8. I-15 North Project

    DOT National Transportation Integrated Search

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  9. 10 CFR 800.001 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...

  10. 10 CFR 800.001 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...

  11. Investigation of warm-mix asphalt using Iowa aggregates.

    DOT National Transportation Integrated Search

    2011-04-01

    The implementation of warm-mix asphalt (WMA) is becoming more widespread with a growing number of contractors utilizing various WMA technologies. Early research suggests WMA may be more susceptible to moisture damage than traditional hot-mix asphalt ...

  12. Investigation of warm-mix asphalt using Iowa aggregates.

    DOT National Transportation Integrated Search

    2011-04-01

    The implementation of warm-mix asphalt (WMA) is becoming more widespread with a growing number of contractors utilizing various : WMA technologies. Early research suggests WMA may be more susceptible to moisture damage than traditional hot-mix asphal...

  13. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  14. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  15. 48 CFR 252.209-7006 - Limitations on Contractors Acting as Lead System Integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system(s), subsystem(s), system of systems, or services described in this solicitation. (d) If the... through a process over which the offeror exercised no control. (f) This provision implements the...

  16. Understanding pave-IR : background, use, and advanced techniques

    DOT National Transportation Integrated Search

    2010-01-01

    Why Has TxDOT Implemented Pave-IR? : Promote more uniform, higher quality pavements : Minimize/eliminate thermal segregation : Expand range of weather conditions for paving : Special Provision 341-024 : Contains option for contractor to use Pave-IR :...

  17. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  18. 48 CFR 927.302 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... necessary to practice the subject of the contract in the fields of technology specifically contemplated in the contract effort. That need may arise where the contractor is not attempting to take the technology... contracts; for planning contracts; for contracts with educational institutions; for contracts for...

  19. 48 CFR 3009.470-3 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...

  20. 48 CFR 3009.470-3 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...

  1. 48 CFR 3009.470-3 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...

  2. 48 CFR 3009.470-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...

  3. 48 CFR 3009.470-3 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...

  4. 48 CFR 1309.507-2 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2... systems for which task orders may be issued and indicate which organizational conflict of interest... order which organizational conflict of interest provision in paragraph (a)(2) of this clause shall apply...

  5. 48 CFR 9.303 - Use.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... or specifications; (2) Production has been discontinued for an extended period of time; or (3) The...

  6. 48 CFR 9.000 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope of part. 9.000 Section 9.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... products; first article testing and approval; contractor team arrangements; defense production pools and...

  7. 48 CFR 9.000 - Scope of part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope of part. 9.000 Section 9.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... products; first article testing and approval; contractor team arrangements; defense production pools and...

  8. 48 CFR 9.303 - Use.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... or specifications; (2) Production has been discontinued for an extended period of time; or (3) The...

  9. 48 CFR 9.507-2 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contract clause. 9.507-2 Section 9.507-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING..., for example, when the first production contract using the contractor's specifications or work...

  10. 48 CFR 9.507-2 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract clause. 9.507-2 Section 9.507-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING..., for example, when the first production contract using the contractor's specifications or work...

  11. 48 CFR 9.000 - Scope of part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope of part. 9.000 Section 9.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... products; first article testing and approval; contractor team arrangements; defense production pools and...

  12. 48 CFR 9.303 - Use.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... or specifications; (2) Production has been discontinued for an extended period of time; or (3) The...

  13. 48 CFR 9.303 - Use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... or specifications; (2) Production has been discontinued for an extended period of time; or (3) The...

  14. 48 CFR 9.507-2 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contract clause. 9.507-2 Section 9.507-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING..., for example, when the first production contract using the contractor's specifications or work...

  15. 48 CFR 9.000 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope of part. 9.000 Section 9.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... products; first article testing and approval; contractor team arrangements; defense production pools and...

  16. 48 CFR 9.000 - Scope of part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope of part. 9.000 Section 9.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... products; first article testing and approval; contractor team arrangements; defense production pools and...

  17. 48 CFR 9.303 - Use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... or specifications; (2) Production has been discontinued for an extended period of time; or (3) The...

  18. 48 CFR 9.507-2 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contract clause. 9.507-2 Section 9.507-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING..., for example, when the first production contract using the contractor's specifications or work...

  19. Best practices in guidance for workforce transition and succession planning.

    DOT National Transportation Integrated Search

    2011-04-01

    Public sector transportation agencies and the contractors who help them do their work will have a major challenge in meeting their : workforce needs for the foreseeable future. By some estimates, the aging of the baby boom generation could allow up t...

  20. Best practices in guidance for workforce transition and succession planning.

    DOT National Transportation Integrated Search

    2011-04-01

    "Public sector transportation agencies and the contractors who help them do their work will have a major challenge in meeting their : workforce needs for the foreseeable future. By some estimates, the aging of the baby boom generation could allow up ...

Top