Sample records for contractor management structures

  1. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  2. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  4. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  5. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  6. Managing the Private Spies: Use of Commercial Augmentation for Intelligence Operations

    DTIC Science & Technology

    2006-06-01

    even has a Field Manual devoted to contractor administration which brings out many of the same points (FM 3-100.26, “Contractors on the Battlefi eld...Printing Offi ce), 2001, 53. 38 Mahlon Apgar and John Keane, “New Business with the New Military,” Harvard Business Review, (September 2004), 45. 12 are... manual for Contractors on the Battlefi eld acknowledges that “there is no specifi cally identifi ed force structure nor detailed policy on how to

  7. 41 CFR 102-74.275 - May Federal agencies authorize lessors or parking management contractors to manage, regulate and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorize lessors or parking management contractors to manage, regulate and police parking facilities? 102... contractors to manage, regulate and police parking facilities? Yes, Federal agencies, upon approval from GSA, may authorize lessors or parking management contractors to manage, regulate and police parking...

  8. 41 CFR 102-74.275 - May Federal agencies authorize lessors or parking management contractors to manage, regulate and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authorize lessors or parking management contractors to manage, regulate and police parking facilities? 102... contractors to manage, regulate and police parking facilities? Yes, Federal agencies, upon approval from GSA, may authorize lessors or parking management contractors to manage, regulate and police parking...

  9. 41 CFR 102-74.275 - May Federal agencies authorize lessors or parking management contractors to manage, regulate and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... authorize lessors or parking management contractors to manage, regulate and police parking facilities? 102... contractors to manage, regulate and police parking facilities? Yes, Federal agencies, upon approval from GSA, may authorize lessors or parking management contractors to manage, regulate and police parking...

  10. 41 CFR 102-74.275 - May Federal agencies authorize lessors or parking management contractors to manage, regulate and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... authorize lessors or parking management contractors to manage, regulate and police parking facilities? 102... contractors to manage, regulate and police parking facilities? Yes, Federal agencies, upon approval from GSA, may authorize lessors or parking management contractors to manage, regulate and police parking...

  11. 41 CFR 102-74.275 - May Federal agencies authorize lessors or parking management contractors to manage, regulate and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... authorize lessors or parking management contractors to manage, regulate and police parking facilities? 102... contractors to manage, regulate and police parking facilities? Yes, Federal agencies, upon approval from GSA, may authorize lessors or parking management contractors to manage, regulate and police parking...

  12. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  13. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  14. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  15. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  16. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  17. 48 CFR 51.201 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) 51.201 Policy... contractors to obtain, for official purposes only, interagency fleet management system (IFMS) vehicles and... instance. (c) Government contractors shall not be authorized to obtain interagency fleet management system...

  18. 41 CFR 109-40.000-50 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-40.000-50 Section 109-40.000-50 Public Contracts and Property Management Federal Property...-50 Applicability to contractors. DOE-PMR 109-40, Transportation and Traffic Management, should be applied to cost-type contractors' transportation and traffic management activities. Departure by cost-type...

  19. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  20. Report of the Space Shuttle Management Independent Review Team

    NASA Technical Reports Server (NTRS)

    1995-01-01

    At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

  1. Report of the Space Shuttle Management Independent Review Team

    NASA Astrophysics Data System (ADS)

    1995-02-01

    At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

  2. 48 CFR 970.4402-2 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402-2 General requirements. The following shall apply to the purchasing systems of management and operating contractors: (a) The objective of a management and operating contractor's purchasing system is to...

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Contractor's established financial management information system. (b) Lower level detail used by the Contractor for its own management purposes to validate information provided to NASA shall be... management reporting. 1852.242-73 Section 1852.242-73 Federal Acquisition Regulations System NATIONAL...

  4. 48 CFR 252.245-7003 - Contractor Property Management System Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System Administration. 252.245-7003 Section 252.245-7003 Federal Acquisition Regulations System... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.245-7003 Contractor Property Management System Administration. As prescribed in 245.107, insert the following clause: CONTRACTOR PROPERTY MANAGEMENT SYSTEM...

  5. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  6. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...

  7. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  8. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  9. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  10. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  11. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  12. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  13. ASC Distribution Management Center (DMC) Provides Materiel Management Capability

    DTIC Science & Technology

    2008-09-01

    Distribution Management Center (DMC) is the single interface for the synchronization and integration of logistical functions among active Army units in CONUS...with an integrated team of Soldiers, government service employees, and contractors assigned to Rock Island, as well as forward-positioned Distribution ... Management Teams (DMTs) at 15 major Army installations throughout CONUS, Alaska, and Hawaii. The current DMC structure provides the benefit of

  14. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...

  15. Disability Evaluation System Analysis and Research Annual Report 2017

    DTIC Science & Technology

    2017-11-20

    Amanda L. Kelley, MPH Program Manager, AMSARA Deputy Program Manager, AMSARA Contractor, ManTech Health Contractor, ManTech Health Christine...Toolin, MS Cordie K. Campbell, MPH Public Health Analyst, AMSARA Public Health Analyst, AMSARA Contractor, ManTech Health Contractor...ManTech Health Preventive Medicine Branch Walter Reed Army Institute of Research 503 Robert Grant Road, Forest Glen Annex Silver

  16. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    PubMed

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  17. 48 CFR 51.104 - Furnishing assistance to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...

  18. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  19. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system...

  20. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...

  1. 41 CFR 109-43.302-50 - Utilization by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...

  2. 41 CFR 60-741.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...

  3. 41 CFR 60-300.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  4. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  5. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    PubMed

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  6. 41 CFR 60-1.31 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...

  7. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  8. Risk management. National Aeronautics and Space Administration (NASA). Interim rule adopted as final with changes.

    PubMed

    2000-11-22

    This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.

  9. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  10. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  11. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  12. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  13. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  14. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform...

  15. Construction Manager or General Contractor?

    ERIC Educational Resources Information Center

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  16. 41 CFR 109-38.301-1 - Contractors' use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...

  17. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  18. Writing a success story: lessons learned from the Spitzer Space Telescope

    NASA Astrophysics Data System (ADS)

    Gehrz, R. D.; Roellig, T. L.; Werner, M. W.

    2010-08-01

    A key to the success of the Spitzer Space Telescope (formerly SIRTF) Mission was a unique management structure that promoted open communication and collaboration among scientific, engineering, and contractor personnel at all levels of the project. This helped us to recruit and maintain the very best people to work on Spitzer. We describe the management concept that led to the success of the mission. Specific examples of how the project benefited from the communication and reporting structure, and lessons learned about technology are described.

  19. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227...-technology transfer. Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(4): Patent Rights—Management and Operating Contracts, for-Profit Contractor, Non-Technology...

  20. 48 CFR 51.203 - Means of obtaining service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System... interagency fleet management system (IFMS) vehicles and related services in writing to the appropriate GSA regional Federal Supply Service Bureau, Attention: Regional fleet manager, except that requests for more...

  1. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...

  2. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  3. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  4. 48 CFR 450.303-1 - Contractor requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  5. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  6. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... OFFICE OF PERSONNEL MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S... Acquisition Regulation (FAR) regarding the debarment, suspension, and ineligibility of government contractors... ensure that it contracts only with those entities and individuals (hereinafter, contractors) who are...

  7. 48 CFR 46.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  8. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  9. Empirical Linkages between Firm Competencies and Organisational Learning.

    ERIC Educational Resources Information Center

    Murray, Peter; Donegan, Kevin

    2003-01-01

    Management, operational, technology, and learning competencies in 26 large and 15 small Australian construction contractors were identified at five levels: simplistic, structure, efficiency, value, and dynamic. Organizational learning appeared useful when combined with competency development embedded in the routines of a learning culture.…

  10. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  11. 48 CFR 970.4401-2 - Review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing... contract; (2) The size, experience, ability, reliability, and organization of the management and operating contractor's purchasing function; (3) The internal controls, procedures, and organizational stature of the...

  12. 48 CFR 45.103 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... voluntary consensus standards (see FAR 11.101(b)) and industry-leading practices and standards to manage... contractor's established procedures, practices, and systems used to account for and manage contractor-owned...

  13. 48 CFR 45.103 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... voluntary consensus standards (see FAR 11.101(b)) and industry-leading practices and standards to manage... contractor's established procedures, practices, and systems used to account for and manage contractor-owned...

  14. 48 CFR 45.103 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... voluntary consensus standards (see FAR 11.101(b)) and industry-leading practices and standards to manage... contractor's established procedures, practices, and systems used to account for and manage contractor-owned...

  15. 48 CFR 45.103 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... voluntary consensus standards (see FAR 11.101(b)) and industry-leading practices and standards to manage... contractor's established procedures, practices, and systems used to account for and manage contractor-owned...

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  17. Common occupational classification system - revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahlman, E.J.; Lewis, R.E.

    1996-05-01

    Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less

  18. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    PubMed

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  19. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  20. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  1. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  2. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  3. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  4. 48 CFR 51.205 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS... Fleet Management System (IFMS) Vehicles and Related Services, in solicitations and contracts when a cost... interagency fleet management system (IFMS) vehicles and related services. [48 FR 42476, Sept. 19, 1983, as...

  5. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  6. 48 CFR 645.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  7. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  8. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  9. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  10. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  11. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  12. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  13. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  14. PHMC post-NPH emergency response training

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrads, T.J.

    1997-04-08

    This document describes post-Natural Phenomena Hazard (NPH) emergency response training that was provided to two teams of Project Hanford Management Contractors (PHMC) staff that will be used to assess potential structural damage that may occur as a result of a significant natural phenomena event. This training supports recent plans and procedures to use trained staff to inspect structures following an NPH event on the Hanford Site.

  15. Assessment of Navy Contract Management Processes

    DTIC Science & Technology

    2016-04-30

    Defense (DoD) and defense contractor organizational contract management process capability. The CMMM has been previously applied at Air Force, Army...Navy, and defense contractor organizations. Specific to the Navy, assessments were conducted at three Navy contracting centers using the CMMM. These...agency’s poor contract planning, contract administration, and contractor oversight (DoDIG, 2009, 2012, 2013, 2014). The DoD’s response to the GAO’s high

  16. Top DoD Management Challenges, Fiscal Year 2018

    DTIC Science & Technology

    2018-01-01

    Afghan Human Resource Information Management System to validate ANDSF personnel numbers and salaries; • Afghan Personnel Pay System to facilitate...unit strength accountability and personnel verification; and • Core Information Management System to improve accountability of equipment inventories...ACQUISITION AND CONTRACT MANAGEMENT Federal Acquisition Regulation requires contractor performance information be collected in the Contractor

  17. 48 CFR 51.204 - Use of interagency fleet management system (IFMS) vehicles and related services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor Use of Interagency Fleet Management System (IFMS) 51.204 Use of interagency fleet management system (IFMS) vehicles and related services. Contractors authorized to use interagency fleet management... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use of interagency fleet...

  18. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371 Conduct of employees of DOE...

  19. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  20. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  1. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  2. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  3. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  4. 48 CFR 970.1504-1-5 - General considerations and techniques for determining fixed fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) The Department's fee policy recognizes that fee is remuneration to contractors for the entrepreneurial... and amounts for DOE management and operating contracts is inappropriate considering the limited level.... Instead of being solely cost-based, the desirable approach calls for a structure that allows evaluation of...

  5. 48 CFR 970.1504-1-5 - General considerations and techniques for determining fixed fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The Department's fee policy recognizes that fee is remuneration to contractors for the entrepreneurial... and amounts for DOE management and operating contracts is inappropriate considering the limited level.... Instead of being solely cost-based, the desirable approach calls for a structure that allows evaluation of...

  6. Report: EPA Could Improve Processes for Managing Contractor Systems and Reporting Incidents

    EPA Pesticide Factsheets

    Report #2007-P-00007, January 11, 2007. Although EPA had defined the specific requirements for contractor systems, EPA had not established procedures to ensure identification of all contractor systems.

  7. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  8. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  9. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...

  10. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope. 23.900 Section 23...

  11. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope. 23.900 Section 23...

  12. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope. 23.900 Section 23...

  13. 48 CFR 23.900 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WORKPLACE Contractor Compliance With Environmental Management Systems 23.900 Scope. This subpart implements the environmental management systems requirements for contractors. ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope. 23.900 Section 23...

  14. 76 FR 16838 - Finding of No Significant Impact; Notice of Availability of the Finding of No Significant Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Male, Non-US Citizen, Criminal Aliens at a Contractor-Owned, Contractor-Operated Correctional Facility... aliens within one existing contractor owned, contractor operated facility. Background Information Growth... criminal aliens. In response, the BOP is seeking flexibility in managing its current shortage of beds by...

  15. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free of...

  16. Afghan National Army: DOD Has Taken Steps to Remedy Poor Management of Vehicle Maintenance Program

    DTIC Science & Technology

    2016-07-01

    contract and program were designed to promote the accurate assessment of Afghan vehicle maintenance needs, contractor performance, and cost...containment; (2) the U.S. government provided effective management and oversight of contractor performance; and (3) the contract met its program objectives...maintenance, (2) underestimated the cost of spare parts, and (3) established performance metrics that did not accurately assess contractor performance or

  17. 20 CFR 632.125 - Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., subgrantees and contractors for preventing fraud and program abuse and for general program management. 632.125... and for general program management. (a) Each Native American grantee shall establish and use internal program management procedures sufficient to prevent fraud and program abuse, including subgrantee and...

  18. 20 CFR 632.125 - Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., subgrantees and contractors for preventing fraud and program abuse and for general program management. 632.125... and for general program management. (a) Each Native American grantee shall establish and use internal program management procedures sufficient to prevent fraud and program abuse, including subgrantee and...

  19. 41 CFR 101-26.501-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment by the contractor; e.g., when a medical van is to be equipped with Government- or contractor... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true General. 101-26.501-1 Section 101-26.501-1 Public Contracts and Property Management Federal Property Management Regulations...

  20. 41 CFR 101-26.501-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment by the contractor; e.g., when a medical van is to be equipped with Government- or contractor... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true General. 101-26.501-1 Section 101-26.501-1 Public Contracts and Property Management Federal Property Management Regulations...

  1. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less

  2. The Acquisition Strategy: A Roadmap to Program Management Success

    DTIC Science & Technology

    2012-06-01

    of the positions taken in the AS. Remember , the PM is the spokesperson and storyteller for his/her program. Potential Pitfalls There are just as...them clearly and precisely • Gathers and assesses relevant information , using abstract ideas to interpret it effectively • Comes to well...incen- tive structure informs the contractor what is important and where to focus. The incentive structure can emphasize performance, cost, or

  3. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  4. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract...

  5. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract...

  6. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract...

  7. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract...

  8. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  9. 20 CFR 632.125 - Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management information system in accordance with the requirements of § 632.32. (c) Any person having..., subgrantees and contractors for preventing fraud and program abuse and for general program management. 632.125... and for general program management. (a) Each Native American grantee shall establish and use internal...

  10. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  11. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  12. Management Perspectives Pertaining to Root Cause Analyses of Nunn-McCurdy Breaches: Contractor Motivations and Anticipating Breaches, Volume 6

    DTIC Science & Technology

    2014-01-01

    a similar problem. See Robert Jackall , Moral Mazes: The World of Corporate Managers, London: Oxford University Press, 2009. Contractor Incentives...Night Vision Goggles,” ITT Corporation press release, April 4, 2011. Jackall , Robert, Moral Mazes: The World of Corporate Managers, London: Oxford

  13. 36 CFR 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false How do agencies manage records created or received by contractors? 1222.32 Section 1222.32 Parks, Forests, and Public Property... Agency Recordkeeping Requirements § 1222.32 How do agencies manage records created or received by...

  14. 36 CFR 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false How do agencies manage records created or received by contractors? 1222.32 Section 1222.32 Parks, Forests, and Public Property... Agency Recordkeeping Requirements § 1222.32 How do agencies manage records created or received by...

  15. 36 CFR 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false How do agencies manage records created or received by contractors? 1222.32 Section 1222.32 Parks, Forests, and Public Property... Agency Recordkeeping Requirements § 1222.32 How do agencies manage records created or received by...

  16. 48 CFR 951.101 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 951.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.101 Policy. (a) It is Department of Energy (DOE) policy that contractors performing under cost-reimbursement contracts should meet...

  17. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  18. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  19. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  20. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  1. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  2. 20 CFR 670.985 - What happens if a center operator, screening and admissions contractor or other service provider...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Administrative and Management..., including a screening and admissions contractor; (2) Changing the management staff of a center; (3) Changing...

  3. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System...

  4. 48 CFR 1851.205 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1851.205 Section 1851.205 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management...

  5. 48 CFR 45.000 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government has acquired a lien or title solely because of partial, advance, progress, or performance-based... Section 45.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... Government property to contractors, contractors' management and use of Government property, and reporting...

  6. Defense Management. DOD Needs to Reexamine Its Extensive Reliance on Contractors and Continue to Improve Management and Oversight

    DTIC Science & Technology

    2008-03-11

    guidance dealing with contractors who support deployed forces in October 2005. However, as we recently testified , DOD’s leadership needs to ensure...GAO-08-572T may be “ borderline inherently governmental.”14 We have also found problems with contractors having too much control at other...contract oversight personnel, lessons learned, and training of military commanders and contract oversight personnel. More recently, we testified that DOD’s

  7. Structural Margins Assessment Approach

    NASA Technical Reports Server (NTRS)

    Ryan, Robert S.

    1988-01-01

    A general approach to the structural design and verification used to determine the structural margins of the space vehicle elements under Marshall Space Flight Center (MSFC) management is described. The Space Shuttle results and organization will be used as illustrations for techniques discussed. Given also are: (1) the system analyses performed or to be performed by, and (2) element analyses performed by MSFC and its contractors. Analysis approaches and their verification will be addressed. The Shuttle procedures are general in nature and apply to other than Shuttle space vehicles.

  8. 48 CFR 251.202 - Authorization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 251.202 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency... on contractor insurance. (B) See FAR 28.308 for policy on self-insurance. (C) See FAR 31.205-19 for...

  9. 48 CFR 251.202 - Authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 251.202 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency... on contractor insurance. (B) See FAR 28.308 for policy on self-insurance. (C) See FAR 31.205-19 for...

  10. 48 CFR 251.202 - Authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 251.202 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency... on contractor insurance. (B) See FAR 28.308 for policy on self-insurance. (C) See FAR 31.205-19 for...

  11. 48 CFR 251.202 - Authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 251.202 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency... on contractor insurance. (B) See FAR 28.308 for policy on self-insurance. (C) See FAR 31.205-19 for...

  12. 48 CFR 251.202 - Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 251.202 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency... on contractor insurance. (B) See FAR 28.308 for policy on self-insurance. (C) See FAR 31.205-19 for...

  13. 48 CFR 945.607-2 - Recovering precious metals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.607-2 Recovering precious metals. (b) Contractors generating contractor inventory containing precious metals shall... silver should be reported to the precious metals pool. The Oak Ridge Operations Office is responsible for...

  14. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    EPA Pesticide Factsheets

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  15. 48 CFR 970.0371-4 - Gratuities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-4 Gratuities. Employees of a management and operating contractor shall not, under... contractor is doing business, or proposing to do business, in accomplishing the work under the contract...

  16. 48 CFR 51.200 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope of subpart. 51.200 Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS...

  17. 48 CFR 51.200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope of subpart. 51.200 Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS...

  18. 48 CFR 51.200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope of subpart. 51.200 Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS...

  19. 48 CFR 51.200 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope of subpart. 51.200 Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS...

  20. 48 CFR 51.200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope of subpart. 51.200 Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS...

  1. F 35 JOINT STRIKE FIGHTER DOD Needs to Complete Developmental Testing Before Making Significant New Investments

    DTIC Science & Technology

    2017-04-01

    from contractors . Until Block 3F testing is complete, DOD will not have the knowledge it needs to present a sound business case for Block 4. Second...January 2017 the details of this plan were unclear because DOD’s 2018 budget was not final and negotiations with the contractors were ongoing...management reports and historical test data; discussed key aspects of F-35 development with program management and contractor officials; and compared

  2. Contractor Accounting, Reporting and Estimating (CARE).

    DTIC Science & Technology

    Contractor Accounting Reporting and Estimating (CARE) provides check lists that may be used as guides in evaluating the accounting system, financial reporting , and cost estimating capabilities of the contractor. Experience gained from the Management Review Technique was used as a basis for the check lists. (Author)

  3. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor Performance System (CPS). 642.1503-70 Section 642.1503-70 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503...

  4. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section III, Block 19, generally mean— (A) Technical capability. An assessment of the prospective contractor's key management personnel to determine if they have the basic technical knowledge, experience... completion. This includes— (1) An assessment of the prospective contractor's possession of, or the ability to...

  5. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  6. 10 CFR 719.39 - What happens when more than one contractor is a party to a matter?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What happens when more than one contractor is a party to a matter? 719.39 Section 719.39 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Reimbursement of Costs Subject to This Part § 719.39 What happens when more than one contractor is a party to a...

  7. 10 CFR 719.39 - What happens when more than one contractor is a party to a matter?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What happens when more than one contractor is a party to a matter? 719.39 Section 719.39 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Reimbursement of Costs Subject to This Part § 719.39 What happens when more than one contractor is a party to a...

  8. Defense Acquisition Research Journal (ARJ). Volume 22, Number 3, Issue 74, July 2015

    DTIC Science & Technology

    2016-04-05

    DoD acquisition system and is not limited to government or contractor personnel. • Employees of the federal government (including military personnel...Incentives • Agile Program Management • Incorporating Foreign Military Sales and Direct Contractor Sales Strategies into Programs • Controlling...projected final cost overruns estimated by contractor and government personnel. The comparison shows that the overruns projected by the contractor and

  9. 78 FR 21116 - Superior Supplier Incentive Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... (Quality of Product). Schedule. Cost Control. Management Responsiveness. Management of Key Personnel... unit can only be rated in either the goods or services category. In the event a contractor is within... will provide contractors with the greatest motivation to achieve SSS? 3. What contract terms and...

  10. DFAS Needs More Effective Controls Over Managing DoD Contractor Debt

    DTIC Science & Technology

    2011-07-15

    Acrobat fil e onl y) to audc lev@dod ig.m il. Copies of management comments must have the actual signature of the authori zing official for yo ur...Attribute Testing Results 18 E. Sampling Methodology 20 Glossary of Technical Terms 21 Management...Bill of Collection number to each contractor debt as a debt management tool. CDS allows users to prepare a demand letter from the database, post

  11. New Systems of Food Service Management for the Air Force

    DTIC Science & Technology

    1979-09-01

    Without good management and successful innovations to meet customer needs, institutional food systems either survive precariously, or on a...unlimited access to all base facilities as well as the innovative , profit oriented management of the contractor. The results of this analysis and its...of innovative , profit-oriented management on the part of the contractor. The results of this analysis, along with its impact on the data presented in

  12. 48 CFR 2152.237-70 - Continuity of services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 2152.237-70 Section 2152.237-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Government or another Contractor, may continue them. The Contractor agrees to furnish phase-in training and...) The Contractor shall, upon the Contracting Officer's written notice, (1) furnish phase-in and phase...

  13. 48 CFR 49.108-2 - Prime contractor's rights and obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor's rights and obligations. 49.108-2 Section 49.108-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-2 Prime contractor's rights...

  14. 32 CFR 199.15 - Quality and utilization review peer review organization program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Director, OCHAMPUS. These contractors may include contractors that have exclusive functions in the area of utilization and quality review, fiscal intermediary contractors (which perform these functions along with a... functions concerning management of the delivery and financing of health care services under CHAMPUS...

  15. 36 CFR § 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true How do agencies manage records created or received by contractors? § 1222.32 Section § 1222.32 Parks, Forests, and Public Property... Agency Recordkeeping Requirements § 1222.32 How do agencies manage records created or received by...

  16. 2 CFR 25.310 - Central Contractor Registration (CCR).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Central Contractor Registration (CCR). 25.310 Section 25.310 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS Reserved...

  17. 2 CFR 25.310 - Central Contractor Registration (CCR).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false Central Contractor Registration (CCR). 25.310 Section 25.310 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS PRE-AWARD...

  18. 2 CFR 25.310 - Central Contractor Registration (CCR).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false Central Contractor Registration (CCR). 25.310 Section 25.310 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS PRE-AWARD...

  19. 2 CFR 25.310 - Central Contractor Registration (CCR).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Central Contractor Registration (CCR). 25.310 Section 25.310 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS Pre-award...

  20. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) Contract clause. FAR Index Federal...

  1. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Reinstatement of ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS General Enforcement and Complaint Procedures § 60-250.68 Reinstatement of...

  2. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Reinstatement of ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS General Enforcement and Complaint Procedures § 60-250.68 Reinstatement of...

  3. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Reinstatement of ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS General Enforcement and Complaint Procedures § 60-250.68 Reinstatement of...

  4. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) Contract clause. FAR Index Federal...

  5. Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

    NASA Technical Reports Server (NTRS)

    Kinlaw, Dennis C.; Eads, Jeannette

    1992-01-01

    It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

  6. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  7. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  8. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... System for Award Management (SAM) database (FAR provision 52.204-7), the Contractor shall report the... information from SAM and FPDS databases. If FPDS information is incorrect, the contractor should notify the contracting officer. If the SAM database information is incorrect, the contractor is responsible for...

  9. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... System for Award Management (SAM) database (FAR provision 52.204-7), the Contractor shall report the... information from SAM and FPDS databases. If FPDS information is incorrect, the contractor should notify the contracting officer. If the SAM database information is incorrect, the contractor is responsible for...

  10. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... investigations according to DOT Order 1630.2B, Personnel Security Management. f. The Contractor shall immediately notify the contracting officer when an employee no longer requires access to DOT computer systems due to transfer, completion of a project retirement or termination of employment. g. The Contractor shall include...

  11. U.S. Northern Command > About USNORTHCOM > Doing Business with USNORTHCOM

    Science.gov Websites

    Central Contractor Registration (CCR) http://www.ccr.gov Vendors should register in the U.S. federal government's Central Contractor Registration (CCR). A Data Universal Numbering System (DUNS®) number, provided planning and conducting contracting and contractor management functions in support of joint operations

  12. 78 FR 13383 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... for OMB Review; Comment Request; Standard Job Corps Contractor Information Gathering ACTION: Notice... Contractor Information Gathering,'' to the Office of Management and Budget (OMB) for review and approval for... submission of responses. Agency: DOL-ETA. Title of Collection: Standard Job Corps Contractor Information...

  13. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  14. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  15. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  16. 48 CFR 509.105-1 - Obtaining information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 509.105-1... any appropriate activities, e.g., legal counsel, quality control, contract management, credit and...

  17. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Sales by designated... AND DISPOSAL 45-SALE, ABANDONMENT, OR DESTRUCTION OF PERSONAL PROPERTY 45.3-Sale of Personal Property § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted...

  18. 77 FR 11355 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... the interim rule. Contractor business systems and internal controls are the first line of defense... contractor's accounting system shall provide for management reviews or internal audits of the contractor's... controls as part of any evaluation as to the reliability of information produced by a business system(s...

  19. 29 CFR 471.15 - Under what circumstances must a contractor be provided the opportunity for a hearing?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances must a contractor be provided the...

  20. Region 7 Laboratory Information Management System

    EPA Pesticide Factsheets

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  1. 48 CFR 52.232-33 - Payment by Electronic Funds Transfer-System for Award Management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contained in the System for Award Management (SAM) database. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the SAM database. (c... 210. (d) Suspension of payment. If the Contractor's EFT information in the SAM database is incorrect...

  2. 48 CFR 52.232-33 - Payment by Electronic Funds Transfer-System for Award Management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contained in the System for Award Management (SAM) database. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the SAM database. (c... 210. (d) Suspension of payment. If the Contractor's EFT information in the SAM database is incorrect...

  3. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May Government...

  4. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May Government...

  5. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May Government...

  6. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May Government...

  7. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May Government...

  8. Re-entry Flight Experiments Lessons Learned - The Atmospheric Reentry Demonstrator ARD

    DTIC Science & Technology

    2007-06-01

    civilian cooperative program was managed by Aerospatiale – Lanceurs Stratégiques et Spatiaux (now EADS – SPACE Transportation) as prime contractor. The...of an Al-alloy structure protected on the cone by Norcoat 62250 FI cork tiles and on the heat-shield by Aleastrasil silica-phenolic tiles (Figure 3... structure of the flight data points are meaningful even if the absolute Kp level is doubtful. Figure 19 shows CFD comparisons at Mach 10. The real gas

  9. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...

  10. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    NASA Astrophysics Data System (ADS)

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  11. Key aspects in managing safety when working with multiple contractors: A case study.

    PubMed

    Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.

  12. Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits

    DTIC Science & Technology

    2013-03-07

    performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors

  13. Government Affirmative Misrepresentation and Non-Disclosure of Superior Knowledge in Federal Contracting.

    DTIC Science & Technology

    1984-09-01

    and the heads of its employees. This can be very compendious and some way is needed to I t the responsibility to manageable proportions. The...is manageable by the government on the other. -page 143- C. Government Culpability A bare witholding of factual information material to contract... management system which was at variance with what previous -page 190- contractors had used in performing the same contract. In these regards, the contractor

  14. Meteorological support for space operations: Review and recommendations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The current meteorological support provided to NASA by NOAA, Air Weather Service, and other contractors is reviewed and suggestions are offered for its improvement. These recommendations include improvement in NASA's internal management organizational structure that would accommodate continued improvement in operational weather support, installation of new observing systems, improvement in analysis and forecasting procedures, and the establishment of an Applied Research and Forecasting Facility.

  15. Prestigious Council to Advise National Renewable Energy Lab

    Science.gov Websites

    laboratory by offering independent advice and counsel to the NREL operating contractor and NREL Director five years. The partnership officially became NREL's contractor today, following 21 years of management

  16. 32 CFR 643.115 - Contractors-Permission to erect structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Contractors-Permission to erect structures. 643... (CONTINUED) REAL PROPERTY REAL ESTATE Additional Authority of Commanders § 643.115 Contractors—Permission to... the structure is to be used for any purpose other than the fulfillment of the contract, application...

  17. 48 CFR 52.232-36 - Payment by Third Party.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... during any period the System for Award Management (SAM) indicates that the Contractor has delinquent debt... at http://fms.treas.gov/debt/index.html. If the SAM subsequently indicates that the Contractor no...

  18. 48 CFR 52.232-36 - Payment by Third Party.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... during any period the System for Award Management (SAM) indicates that the Contractor has delinquent debt... at http://fms.treas.gov/debt/index.html. If the SAM subsequently indicates that the Contractor no...

  19. 48 CFR 742.1502 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...

  20. 48 CFR 742.1502 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...

  1. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    DTIC Science & Technology

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  2. Defense Acquisition Research Journal. Volume 23, Number 3, Issue 78, July 2016

    DTIC Science & Technology

    2016-07-01

    and Incentives • Agile Program Management • Incorporating Foreign Military Sales and Direct Contractor Sales Strategies into Programs • Controlling...tem and is not limited to government or contractor personnel. • Employees of the federal government (including military personnel) are en... contractor policies and procedures in this area to enhance the benefits of global technology sourcing while minimizing potential risks? • How could

  3. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  4. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  5. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  6. National Waterways Study: Findings and Conclusions (from Contractor Study Effort).

    DTIC Science & Technology

    1982-05-01

    basic process by which decisions are made by the Congress on the allocation of investments in the navigation system and the levels of funding for...waterways structures anticipates no significant change in the basic navigation technology in the foreseeable future* However, better management of the...other products discussed in this section. " As a result, water transportation handles only about one quarter of all basic and intermediate industrial

  7. Electronic Data Interchange in Procurement

    DTIC Science & Technology

    1990-04-01

    contract management and order processing systems. This conversion of automated information to paper and back to automated form is not only slow and...automated purchasing computer and the contractor’s order processing computer through telephone lines, as illustrated in Figure 1-1. Computer-to-computer...into the contractor’s order processing or contract management system. This approach - converting automated information to paper and back to automated

  8. Summary Report on Financial Reporting of Government Property in the Custody of Contractors.

    DTIC Science & Technology

    1998-10-15

    and Air Force Audit Agency on the financial reporting of Government property in the custody of contractors. The reported amount of Government...Contract Property Management System are used for financial reporting . However, the system and the way the data are entered into financial statements...assessed management controls affecting the financial reporting of Government property and compliance with applicable laws and regulations.

  9. Highlights of contractor initiatives in quality enhancement and productivity improvement

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  10. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hourmore » onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobbs, R.E.

    In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less

  12. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    NASA Astrophysics Data System (ADS)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  13. Naval Petroleum and Oil Shale Reserves Combined Financial Statements September 30, 1994 and 1993 and Management Overview and Supplemental Financial and Management Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on the 1994 statements. Their reports on the NPOSR internal control structure and on compliance with laws and regulations, and management letter on addressing needed improvements are also provided. NPOSR consists of petroleum reserves in California and Wyoming, and oil shale reserves in Colorado and Utah. The Government`s interests in NPOSR are managed by the Department through its headquarters office inmore » Washington, D.C. In addition, the Department has site offices in both California and Wyoming that are responsible for contractor oversight functions. Daily operations are conducted under contract by two management and operating contractors. By law, NPOSR was authorized to produce crude oil at the maximum efficient rate for six years. The law allowed production to be extended for three year periods, provided that the President of the United States certified that continued maximum production was in the best interest of the nation. The current three year period ends on April 5, 1997. Additional information about NPOSR is provided in the overview and notes to the financial statements.« less

  14. Enabling Operational Reach and Endurance: The Use of Contractors During World War II

    DTIC Science & Technology

    2016-05-26

    Enabling Operational Reach and Endurance: The Use of Contractors During World War II A...TITLE AND SUBTITLE 5a. CONTRACT NUMBER Enabling Operational Reach and Endurance: The Use of Contractors During World War II 5b. GRANT NUMBER 5c...Army Operating Concept does not address the use or incorporation of contractors to augment force structure in the event of a militarized response

  15. Field management of asphalt concrete mixes.

    DOT National Transportation Integrated Search

    1988-01-01

    Marshall properties were determined on mixes from three different contractors each producing a 1/2-in and a 3/4-in top-sized aggregate mix. From these data, statistical analyses were made to determine differences among contractors and between mix typ...

  16. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  17. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  18. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  19. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  20. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  1. U.S. Department of Energy, Office of Legacy Management Program Update, April-June 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2009-04-01

    Welcome to the April-June 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. The Legacy Management goals are: (1) Protect human health and the environment through effective and efficient long-term surveillance and maintenance - This goal highlights DOE's responsibility to ensure long-term protection of people, the environment, and the integrity of engineered remedies and monitoring systems. (2) Preserve, protect, and make accessible legacy records and information - This goal recognizes LM's commitment to successfully manage records, information, and archives of legacymore » sites under its authority. (3) Support an effective and efficient work force structured to accomplish Departmental missions and assure continuity of contractor worker pension and medical benefits - This goal recognizes DOE's commitment to its contracted work force and the consistent management of pension and health benefits. As sites continue to close, DOE faces the challenges of managing pension plan and health benefits liability. (4) Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition - This goal recognizes a DOE need for local collaborative management of legacy assets, including coordinating land use planning, personal property disposition to community reuse organizations, and protecting heritage resources (natural, cultural, and historical). (5) Improve program effectiveness through sound management - This goal recognizes that LM's goals cannot be attained efficiently unless the federal and contractor work force is motivated to meet requirements and work toward continuous performance improvement.« less

  2. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  3. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  4. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  5. Report: Lack of Project Plan Resulted in Transition and Contractor Performance Problems for the Institutional Controls Tracking System

    EPA Pesticide Factsheets

    Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.

  6. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  7. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  8. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  9. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  10. ACHP | Working Together to Build a More Inclusive Preservation Program

    Science.gov Websites

    Manager. He has over a decade of experience in the construction industry as a contractor and project working on my Masters, I was employed by an Athens, GA-based general contractor who specialized in

  11. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  12. A Management Case Analysis of the Department of Defense Contractor Risk Assessment Guide Program

    DTIC Science & Technology

    1990-12-01

    ORGANIZATION ......... 17 1. Past Government Organization Problems... 17 2. Current Government Organization ......... 17 3. The Contractor’s Organizatin ...Program and urged CODSIA to take a leadership role in encouraging its members to participate. The DCAA [Ref ll:p. 45] informed defense contractors in...conferences, and through the leadership of officials including the Under Secretary of the Navy for Acquisition, DOD Comptroller General, DOD Inspector General

  13. #eVALUate: Monetizing Service Acquisition Trade-offs Using the QUALITY-INFUSED Price Methodology

    DTIC Science & Technology

    2016-04-01

    methodologies that are incompatible with the characteristics of services. These methodologies involve best-value source selection and contractor ...defense contractors for services, it lacks the key elements at the strategic and tactical levels to make service contracts a managed outcome (U.S...Regulation (FAR) defines a service contract as a “contract that directly engages the time and effort of a contractor whose primary purpose is to

  14. Overseas Contingency Operations: Observations on the Use of Force Management Levels in Afghanistan, Iraq, and Syria

    DTIC Science & Technology

    2016-12-01

    relating to security force assistance activities and readiness of U.S. Special Operations Forces. • Increased Use of Contractors and Personnel on...Temporary Duty. DOD relies on contractors to support a wide range of military operations and free up uniformed personnel to directly support mission...needs. During operations in Afghanistan and Iraq contractor personnel played a critical role in supporting U.S. troops and sometimes exceeded the

  15. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  16. Nasa's Emerging Productivity Program

    NASA Technical Reports Server (NTRS)

    Braunstein, D. R.

    1984-01-01

    The goals, membership, and organizational structure of the NASA Productivity Steering Committee are described as well as steps taken to make NASA a leader in the development and application of productivity and quality concepts at every level of agency management. The overall strategy for the Productivity Improvement and Quality Enhancement (PIQE) Program is through employee involvement, both civil servant and contractor, in all phases of agency-wide activity. Elements of the PIQE program and initial thrusts are examined.

  17. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1994-04-01

    This report is organized by the program task structure as follows: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple fabrication; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance and reliability, contract changes, noncapital contractor acquired government owned property (CAGO) acquisition, and CAGO maintenance; and (10) CAGO acquisition.

  18. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  19. 48 CFR 951.103 - Ordering from Government supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... supply sources. 951.103 Section 951.103 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.103 Ordering from Government supply sources. (b) The Senior Procurement Executive shall be...

  20. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms...

  1. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms...

  2. 48 CFR 1652.204-70 - Contractor records retention.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contractor records retention. 1652.204-70 Section 1652.204-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts...

  3. 48 CFR 1652.204-70 - Contractor records retention.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contractor records retention. 1652.204-70 Section 1652.204-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts...

  4. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms...

  5. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms...

  6. 48 CFR 750.7109 - Submission of requests by contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Submission of requests by contractors. 750.7109 Section 750.7109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect...

  7. Private Sector Adds to the Menu.

    ERIC Educational Resources Information Center

    Donovan, Sharon

    1997-01-01

    Two school districts, Kennewick School District WA and Salem-Keizer School District OR, are leveraging their food service contractor's resources to establish work-based courses stressing sophisticated management, culinary, and life skills. Under these instructional partnerships, the contractor, cooperating with school officials, develops the…

  8. 48 CFR 42.1200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 42.1200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Novation and Change-of-Name Agreements 42.1200 Scope of subpart... Government contracts when contractor assets are transferred; (b) Recognition of a change in a contractor's...

  9. 77 FR 14440 - Notice of Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... INFORMATION: I. Abstract To ensure accurate reporting of Government-owned, contractor-held property on the financial statements and to provide information necessary for effective property management, NASA obtains summary data annually from the official Government property records maintained by its contractors, on the...

  10. 77 FR 39518 - Notice of Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... INFORMATION: I. Abstract To ensure accurate reporting of Government-owned, contractor-held property on the financial statements and to provide information necessary for effective property management, NASA obtains summary data annually from the official Government property records maintained by its contractors, on the...

  11. 75 FR 70298 - Notice of Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... INFORMATION: I. Abstract To ensure accurate reporting of Government-owned, contractor-held property on the financial statements and to provide information necessary for effective property management, NASA obtains summary data annually from the official Government property records maintained by its contractors, on the...

  12. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor chooses to maintain paper documents in electronic format, the electronic version must be an exact replica of the paper document. (End of clause) [70 FR 41155, July 18, 2005] ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CLAUSES AND FORMS...

  13. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Contractor chooses to maintain paper documents in electronic format, the electronic version must be an exact replica of the paper document. (End of clause) [70 FR 41155, July 18, 2005] ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CLAUSES AND FORMS...

  14. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Contractor chooses to maintain paper documents in electronic format, the electronic version must be an exact replica of the paper document. (End of clause) [70 FR 41155, July 18, 2005] ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CLAUSES AND FORMS...

  15. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor chooses to maintain paper documents in electronic format, the electronic version must be an exact replica of the paper document. (End of clause) [70 FR 41155, July 18, 2005] ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CLAUSES AND FORMS...

  16. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36 Government...

  17. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36 Government...

  18. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36 Government...

  19. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36 Government...

  20. 48 CFR 252.244-7001 - Contractor purchasing system administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....246-7007, Contractor Counterfeit Electronic Part Detection and Avoidance System, if applicable; (20... Defense to rely upon information produced by the system that is needed for management purposes. (b... Counterfeit Electronic Part Detection and Avoidance System; (2) Provide for an organizational and...

  1. 48 CFR 44.304 - Surveillance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Surveillance. 44.304... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.304 Surveillance. (a) The ACO shall maintain a sufficient level of surveillance to ensure that the contractor is effectively managing...

  2. 48 CFR 44.304 - Surveillance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Surveillance. 44.304... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.304 Surveillance. (a) The ACO shall maintain a sufficient level of surveillance to ensure that the contractor is effectively managing...

  3. 48 CFR 44.304 - Surveillance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Surveillance. 44.304... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.304 Surveillance. (a) The ACO shall maintain a sufficient level of surveillance to ensure that the contractor is effectively managing...

  4. 48 CFR 44.304 - Surveillance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Surveillance. 44.304... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.304 Surveillance. (a) The ACO shall maintain a sufficient level of surveillance to ensure that the contractor is effectively managing...

  5. 48 CFR 44.304 - Surveillance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Surveillance. 44.304... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.304 Surveillance. (a) The ACO shall maintain a sufficient level of surveillance to ensure that the contractor is effectively managing...

  6. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... delivery schedules. (32) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors... performance in the areas of design, development, and production. (41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development...

  7. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  8. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  9. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  10. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  11. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  12. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  13. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  14. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  15. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  16. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  17. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...

  18. 48 CFR 42.1200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 42.1200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Novation and Change-of-Name Agreements 42.1200 Scope of subpart... Government contracts when contractor assets are transferred; (b) Recognition of a change in a contractor's...

  19. Civilian Workforce 2020: Strategies for Modernizing Human Resources Management in the Department of the Navy

    DTIC Science & Technology

    2000-08-18

    heavy reliance on contractors to perform much of the work performed by civilian employees . While this trend is expected to continue, a critical mass...manage, and, if necessary, terminate non- performing employees . Accountability measures should be clear and have consequences. ◆ Investments in human...complexity of work increas- es and the performance of industrial-type functions is shifted to contractors. The impact of this shift on the occupational

  20. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  1. Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darr, Paul S.

    2016-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of themore » cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.« less

  2. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An assessment of NASA's safety performance for 1983 affirms that NASA Headquarters and Center management teams continue to hold the safety of manned flight to be their prime concern, and that essential effort and resources are allocated for maintaining safety in all of the development and operational programs. Those conclusions most worthy of NASA management concentration are given along with recommendations for action concerning; product quality and utility; space shuttle main engine; landing gear; logistics and management; orbiter structural loads, landing speed, and pitch control; the shuttle processing contractor; and the safety of flight operations. It appears that much needs to be done before the Space Transportation System can achieve the reliability necessary for safe, high rate, low cost operations.

  3. The Pioneer Projects - Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  4. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  5. 48 CFR 45.000 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... payments; to disposal of real property; or to software and intellectual property. [72 FR 27385, May 15... GOVERNMENT PROPERTY 45.000 Scope of part. This part prescribes policies and procedures for providing Government property to contractors, contractors' management and use of Government property, and reporting...

  6. 48 CFR 251.102 - Authorization to use Government supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government supply sources. 251.102 Section 251.102 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 251.102 Authorization to use Government supply sources. (e) When...

  7. 48 CFR 251.102 - Authorization to use Government supply sources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Government supply sources. 251.102 Section 251.102 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 251.102 Authorization to use Government supply sources. (e) When...

  8. 48 CFR 51.100 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope of subpart. 51.100 Section 51.100 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.100 Scope of...

  9. 48 CFR 51.100 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope of subpart. 51.100 Section 51.100 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.100 Scope of...

  10. 48 CFR 51.100 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope of subpart. 51.100 Section 51.100 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.100 Scope of...

  11. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... the contractor to accomplish all inspection and testing needed to ensure that supplies or services acquired at or below the simplified acquisition threshold conform to contract quality requirements before...

  12. 48 CFR 245.7205 - Reporting excess and surplus contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... surplus contractor inventory. 245.7205 Section 245.7205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Special... the report are self-explanatory except: (1) Line 1—Insert totals from line 7 of the preceding report...

  13. 48 CFR 750.7109-2 - Form of requests by contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Form of requests by contractors. 750.7109-2 Section 750.7109-2 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect...

  14. TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements

    DTIC Science & Technology

    2012-12-05

    these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support

  15. 48 CFR 242.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Contractor estimating systems (see FAR 15.407-5); and (B) Contractor material management and accounting... report identifying significant accounting system or related internal control deficiencies. (9) For... solicitation or award. (S-70) Serve as the single point of contact for all Single Process Initiative (SPI...

  16. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  17. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  18. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  19. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  20. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  1. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  2. Comparative Study On The Ethical Perceptions Of Contractors And Designers In The China Construction Industry

    NASA Astrophysics Data System (ADS)

    Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian

    2017-12-01

    Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.

  3. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  4. 48 CFR 951.102 - Authorization to use Government supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government supply sources. 951.102 Section 951.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.102 Authorization to use Government supply sources. (a) The Head of the Contracting Activity...

  5. 48 CFR 49.402-6 - Repurchase against contractor's account.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Termination for Default 49.402-6 Repurchase against..., considering the quality and delivery requirements. The contracting officer may repurchase a quantity in excess... of the repurchase contract, make a written demand on the contractor for the total amount of the...

  6. 48 CFR 945.570-1 - Acquisition of motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vehicles. 945.570-1 Section 945.570-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... vehicles. (a) GSA Interagency Fleet Management System (GSA-IFMS) is the first source of supply for providing motor vehicles to contractors; however, contracting officer approval is required for contractors...

  7. 48 CFR 49.402-6 - Repurchase against contractor's account.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Termination for Default 49.402-6 Repurchase against..., considering the quality and delivery requirements. The contracting officer may repurchase a quantity in excess... of the repurchase contract, make a written demand on the contractor for the total amount of the...

  8. 48 CFR 47.303-17 - Contractor-prepaid commercial bills of lading, small package shipments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply... advantageous to the Government, the contracting officer may authorize the contractor to ship supplies, which... subsection, do not require a contract modification. Unless otherwise provided in the contract, the supplies...

  9. 41 CFR 60-4.5 - Hometown plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Hometown plans. 60-4.5...-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.5 Hometown plans. (a) A contractor participating, either individually or through an association, in an approved Hometown Plan (including heavy...

  10. 76 FR 35861 - Safety Culture at the Waste Treatment and Immobilization Plant

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... high. This unhealthy tension has rendered the WTP project's formal processes to resolve safety issues... Board's investigative record demonstrates that both DOE and contractor project management behaviors... allegations raised by Dr. Tamosaitis, a contractor employee removed from his position at WTP, a construction...

  11. 48 CFR 52.204-13 - System for Award Management Maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (SAM) database means that— (1) The Contractor has entered all mandatory information, including the DUNS... database; (2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database; (3) The Government has validated all...

  12. Conversion of Low Quality Waste Heat to Electric Power with Small-Scale Organic Rankine Cycle (ORC) Engine/Generator Technology

    DTIC Science & Technology

    2016-06-01

    Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when

  13. Cost and schedule management on the quiet short-haul research aircraft project

    NASA Technical Reports Server (NTRS)

    Wilcox, D. E.; Patterakis, P.

    1979-01-01

    The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.

  14. Government - Prime Contractor - Subcontractor Relationships: An Analysis.

    DTIC Science & Technology

    1979-12-01

    contract, prime contractor frustration and animosity due to over zealous 122 JAM ,- Government managers, and subcontractor problems of "over- reach" and...Journal, Vol. 12, No. 2,Second Quarter, 1978. 41. Singer, N.P., "The Unheard of Standard Set of Sub- contract Terms and Conditions - As Easy as Pumpkin Pie

  15. 48 CFR 16.103 - Negotiating contract type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be... and fee) that will result in reasonable contractor risk and provide the contractor with the greatest... meet the agency need. (ii) Discuss the Government's additional risks and the burden to manage the...

  16. 77 FR 40884 - Office of the Chief Information Officer; Information Collection; Temporary Contractor Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... Management and Budget (OMB) a request to review and approve a previously approved information collection... collection to make determinations on granting unescorted physical access to GSA-controlled facilities. The approval is critical for GSA to continue to make physical access determinations for temporary contractors...

  17. 48 CFR 49.104 - Duties of prime contractor after receipt of notice of termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Duties of prime contractor after receipt of notice of termination. 49.104 Section 49.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.104...

  18. 76 FR 5212 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Report of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... for OMB Review; Comment Request; Report of Construction Contractor's Wage Rates ACTION: Notice...) sponsored information collection request (ICR) titled, ``Report of Construction Contractor's Wage Rates,'' to the Office of Management and Budget (OMB) for review and approval for continued use in accordance...

  19. 41 CFR 109-40.5004 - Government bills of lading.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Government bills of... Government bills of lading. In those instances where DOE cost-type contractors are authorized to use Government bills of lading, specific employees of cost-type contractors will be authorized by the contracting...

  20. 41 CFR 109-40.5004 - Government bills of lading.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Government bills of... Government bills of lading. In those instances where DOE cost-type contractors are authorized to use Government bills of lading, specific employees of cost-type contractors will be authorized by the contracting...

  1. 78 FR 53173 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2013-0112] Agency Information Collection Activities... for employment), contractors, and consultants of NRC licensees and contractors whose activities involve access to, or control over, special nuclear material at either fixed sites or for transportation...

  2. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contractor cooperation in... Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES... Agency management, Agency EEO officials, the Equal Employment Opportunity Commission (EEOC), or a court...

  3. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contractor cooperation in... Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES... Agency management, Agency EEO officials, the Equal Employment Opportunity Commission (EEOC), or a court...

  4. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contractor cooperation in... Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES... Agency management, Agency EEO officials, the Equal Employment Opportunity Commission (EEOC), or a court...

  5. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contractor cooperation in... Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES... Agency management, Agency EEO officials, the Equal Employment Opportunity Commission (EEOC), or a court...

  6. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor cooperation in... Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES... Agency management, Agency EEO officials, the Equal Employment Opportunity Commission (EEOC), or a court...

  7. 76 FR 36177 - Labor-Management Reporting and Disclosure Act; Interpretation of the “Advice” Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... individual employees, and other failures to observe high standards of responsibility and ethical conduct... Labor: Any agreement or arrangement with a labor relations consultant or other independent contractor or..., consultant, or other independent contractor which he directly delivers or disseminates to employees for the...

  8. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  9. 78 FR 79455 - Information Collection; System for Award Management Registration Requirements for Prime Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ...Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve a renewal of the currently approved information collection requirement regarding the pre-award registration requirements for Prime Grant Recipients. The title of the approved information collection is Central Contractor Registration Requirements for Prime Grant Recipients (OMB Control Number 3090-0290). The updated information collection title, based on the migration of the Central Contractor Registration system to the System for Award Management in late July 2012, is System for Award Management Registration Requirements for Prime Grant Recipients.

  10. Technical and management information system: The tool for professional productivity on the space station program

    NASA Technical Reports Server (NTRS)

    Montoya, G.; Boldon, P.

    1985-01-01

    The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

  11. Evaluation of Supply Chain Management Systems Used in Civil Engineering

    NASA Astrophysics Data System (ADS)

    Tomczak, Michał; Rzepecki, Łukasz

    2017-10-01

    One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.

  12. 41 CFR 109-1.5205 - Personal property management system changes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management system changes. 109-1.5205 Section 109-1.5205 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS... Personal property management system changes. Any proposed significant change to a designated contractor's...

  13. 48 CFR 32.1108 - Payment by Governmentwide commercial purchase card.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., contracting officers are required to verify (by looking in the System for Award Management (SAM)) whether the... payment during any period the SAM indicates that the contractor has delinquent debt subject to collection...) Contracting officers shall not use the presence of the SAM debt flag indicator to exclude a contractor from...

  14. 48 CFR 32.1108 - Payment by Governmentwide commercial purchase card.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., contracting officers are required to verify (by looking in the System for Award Management (SAM)) whether the... payment during any period the SAM indicates that the contractor has delinquent debt subject to collection...) Contracting officers shall not use the presence of the SAM debt flag indicator to exclude a contractor from...

  15. 77 FR 72905 - Pipeline Safety: Random Drug Testing Rate; Contractor MIS Reporting; and Obtaining DAMIS Sign-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and... DAMIS Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... testing information must be submitted for contractors performing or ready to perform covered functions...

  16. Total Quality Leadership

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity. The panel presentations and Keynote speeches revolving around the theme of total quality leadership provided a solid base of understanding of the importance, benefits, and principles of total quality management (TQM). The presentations from the conference are summarized.

  17. Leadership and Management Education and Training (LMET) Course Requirements for Recruit Company Commanders and ’A’ School Instructors.

    DTIC Science & Technology

    1983-12-01

    integration of TAEG findings with contractor findings. Critical incident interview techniques, as used by the contractor, were specifically prohibited in order...than the critical incident interview technique were to be explored for use in the identification of leadership competencies. These competencies and

  18. 48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise primary management direction and control over the PI and be overall responsible for the PI's performance under this contract...

  19. 29 CFR 471.10 - How will the Department determine whether a contractor is in compliance with Executive Order...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review and Complaint Procedures § 471.10...

  20. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Federal Agency (CFA) as being compliant with the guidelines in ANSI/EIA Standard-748 (current version at... and accepted by the CFA at the time of award, see paragraph (b) of this clause. The Contractor shall..., the Contractor's EVM system has not been validated and accepted by the CFA as complying with EVMS...

  1. 76 FR 61391 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... asked to report: Non-Federal consultants, contractors and invited travelers. 7. An estimate of the... 445, ``Request for Approval of Foreign Travel,'' is supplied by consultants, contractors, and NRC invited travelers who must travel to foreign countries in the course of conducting business for the NRC...

  2. 48 CFR 952.223-76 - Conditional payment of fee or profit-safeguarding restricted data and other classified...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., which may be included in the DOE approved contractor Integrated Safety Management System (ISMS). The... DOE directives actually resulting in, or creating a risk of, loss, compromise, or unauthorized... compartmented information (SCI), or high risk nuclear weapons-related data. (ii) Contractor actions that result...

  3. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  4. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaeh, R.A.

    1993-04-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 ormore » more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.« less

  5. European X-ray observatory satellite (Exosat)

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Initially planned to be launched on the Ariane L6, the 510 kilogram European X-Ray Observatory Satellite (EXOSAT) is to be placed into orbit from Space Launch Complex 2 West by NASA's Delta 3914 launch vehicle. Objectives of the mission are to study the precise position, structure, and temporal and spectral characteristics of known X-ray sources as well as search for new sources. The spacecraft is described as well as its payload, principal subsystems, and the stages of the Delta 3914. The flight sequence of events, land launch operations are discussed. The ESA management structure for EXOSAT, the NASA/industry team, and contractors are listed.

  6. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  7. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  8. 48 CFR 970.0371-9 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal....5203-3, Contractor's Organization, in all management and operating contracts. The approval authority of...

  9. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM... knowledge of the reasons for the subcontractor being listed with an exclusion in SAM. (3) The compelling... SAM. (4) The systems and procedures the Contractor has established to ensure that it is fully...

  10. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM... knowledge of the reasons for the subcontractor being listed with an exclusion in SAM. (3) The compelling... SAM. (4) The systems and procedures the Contractor has established to ensure that it is fully...

  11. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or bonus...

  12. 10 CFR 719.37 - Are there any special procedures or requirements regarding subcontractor legal costs?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements regarding subcontractor legal costs? (a) The contractor must have a monitoring system for subcontractor legal matters likely to reach $100,000 over the life of the matter. The purpose of this system is... subcontractor legal costs? 719.37 Section 719.37 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT...

  13. 41 CFR 301-70.701 - Who has the authority to grant exemptions to mandatory use of Government contractor-issued travel...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... through a travel charge card is impractical or imposes unreasonable burdens or costs on Federal employees... grant exemptions to mandatory use of Government contractor-issued travel charge card for official travel? 301-70.701 Section 301-70.701 Public Contracts and Property Management Federal Travel Regulation...

  14. Case Studies in Educational Performance Contracting. Part 3. Texarkana, Arkansas; Liberty-Eylau, Texas.

    ERIC Educational Resources Information Center

    Carpenter, Polly; And Others

    The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…

  15. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  16. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or bonus...

  17. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or bonus...

  18. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or bonus...

  19. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or bonus...

  20. Eastern Gas Shales Project (EGSP) data files: a final report. Open-file report 81-598

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyman, T.S.

    1981-01-01

    The United States Geological Survey and Petroleum Information Corporation (PI) of Denver have created two large computerized files of data for the Eastern Gas Shales Project (EGSP) as part of a large responsibility to the Department of Energy (DOE), Morgantown Energy Technology Center (METC), in Morgantown, West Virginia. Computer-compatible well, outdrop, and sample data from EGSP contractors are being stored on digital tape and delivered to METC for subsequent data-base management. This report has been written to: (1) discuss data-file background and development, (2) address specific problems and solutions for future project use, and (3) present a general summary ofmore » well- and sample-data file content by state, county, well, contractor, and subject coverage. When looking at the EGSP data-gathering task in retrospect, modifications to project management would have made the data-gathering process more successful. Many problems resulted from having contractors perform their own data encoding. Some EGSP contractors had little knowledge of computer- and data-encoding techniques, and they often delegated encoding responsibilities to subordinates who were not properly informed about procedures. The overall lack of uniformity in analytical procedures and methods resulted in an apparent over-abundance of card classes. Nearly 40% of the available card classes were never used, and about 30% of those used contain fewer than 100 data records. The most serious problem encountered during data-file development has been the long delay in arranging for an efficient retrieval and mapping system. Sample-and well-data file management are now coordinated through METC, and Petroleum Information Corporation maintains an effective in-house data management system for data retrieval and analysis. The present system would have been very useful to retrieve data for contractor needs two years earlier, even though the files were incomplete.« less

  1. 36 CFR 1222.32 - How do agencies manage records created or received by contractors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT CREATION AND MAINTENANCE OF FEDERAL RECORDS...) (48 CFR parts 200-299). (2) Records management oversight of contract records is necessary to ensure...

  2. A Study on Management of Contract Conditions of Yen Loan Projects in Philippine and Vietnam

    NASA Astrophysics Data System (ADS)

    Matsuba, Yasutaka; Ozawa, Kazumasa; Yasutani, Satoru

    FIDIC conditions of contract are used in many cases as general conditions for public works funded by Japanese yen loan, but there are cases where the particular conditions are written as to add some special clauses or change some clauses of FIDIC general conditions based on their own current contract conditions and customs, which will lead to restriction of rights and duties of the Engineer and Contractor. This paper focuses on yen loan projects in Philippine and Vietnam, and describes the actual contract management of FIDIC conditions of contract from the viewpoints such as: a) relationship between Client, Contractor and the Engineer b) claim for rights and contract managements. Based on interviews to parties concerned and literature reviews of public works concerned, contractor's rights are granted relatively wider in yen loan projects compared with locally-funded projects. However, it is also observed that the Engineer's rights are restricted by particular conditions, which is written in line with their own public procurement policies of both countries. Some discussions are added how these local procurement policies affect the implementation of FIDIC conditions of contract, and clarified what are the differences of contract management between both countries.

  3. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) andmore » subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.« less

  4. 76 FR 79565 - Management Contracts-Background Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Management Contracts--Background Investigations AGENCY: National Indian Gaming Commission. ACTION: Notice of... investigation process required for management contracts. The proposed revision may reduce duplication of efforts... to clarify that a management contractor should be required to submit background information when the...

  5. 25 CFR 531.1 - Required provisions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR MANAGEMENT CONTRACT PROVISIONS CONTENT OF MANAGEMENT CONTRACTS § 531.1 Required provisions. Management contracts shall conform to all of the requirements... management contractor to provide the tribal governing body not less frequently than monthly with verifiable...

  6. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  7. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970.3270(b)(1), insert the following clause: Financial Management System (DEC 2000) The Contractor shall...

  8. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  9. Space Station Freedom data management system growth and evolution report

    NASA Technical Reports Server (NTRS)

    Bartlett, R.; Davis, G.; Grant, T. L.; Gibson, J.; Hedges, R.; Johnson, M. J.; Liu, Y. K.; Patterson-Hine, A.; Sliwa, N.; Sowizral, H.

    1992-01-01

    The Information Sciences Division at the NASA Ames Research Center has completed a 6-month study of portions of the Space Station Freedom Data Management System (DMS). This study looked at the present capabilities and future growth potential of the DMS, and the results are documented in this report. Issues have been raised that were discussed with the appropriate Johnson Space Center (JSC) management and Work Package-2 contractor organizations. Areas requiring additional study have been identified and suggestions for long-term upgrades have been proposed. This activity has allowed the Ames personnel to develop a rapport with the JSC civil service and contractor teams that does permit an independent check and balance technique for the DMS.

  10. Safety programmes in the Egyptian construction industry.

    PubMed

    Hassanein, Amr A G; Hanna, Ragaa S

    2007-12-01

    This study is aimed at exploring the nature of the safety programmes applied by large-size contractors operating in Egypt. Results revealed that safety programmes applied by those contractors were less formal than the programmes applied by their American counterparts. Only three contractors out of the surveyed sample had accident records broken down by projects, provided workers with formal safety orientation, and trained safety personnel on first-aid. The study recommended that reforms to the scheme of the employers' contribution to social insurance are necessary. This is meant to serve as a strong incentive for safety management.

  11. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  12. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  13. 41 CFR 109-27.202 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... more suitable, designated contractors may use other generally accepted approaches to the management of... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Applicability. 109-27.202 Section 109-27.202 Public Contracts and Property Management Federal Property Management...

  14. 41 CFR 109-27.202 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... more suitable, designated contractors may use other generally accepted approaches to the management of... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Applicability. 109-27.202 Section 109-27.202 Public Contracts and Property Management Federal Property Management...

  15. 25 CFR 533.6 - Approval and disapproval.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of related business and financial arrangements; (2) The management contractor or its agents have... NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR MANAGEMENT CONTRACT PROVISIONS APPROVAL OF MANAGEMENT CONTRACTS § 533.6 Approval and disapproval. (a) The Chairman may approve a management contract if...

  16. Department of the Air Force Information Technology Program FY 95 President’s Budget

    DTIC Science & Technology

    1994-03-01

    2095 2200 552 900 1032 Description: Contractor hardware maintenan support, systems analyst support software development and maintenance, and off -the...hardware maintenance support, systems analyst support, operations support, configuration management, test support, and off -the-shelf software license...2419 2505 2594 Description: Contractor hardware maintenance support, systems analyst support, operations support, and off -the-shelf software license

  17. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  18. Product Line Acquisition in the DoD: The Promise, The Challenges

    DTIC Science & Technology

    1999-12-01

    Organizational Structure 8 3.4 Providing an Appropriate Funding Model 9 3.5 Developing and Implementing an Acquisition Strategy 10 3.6 Contractor Interface...providing an appropriate funding model • achieving the right organizational structure • developing and implementing an acquisition strategy • contractor...organizational change rather than attempt a risky enterprise overhaul. 3.4 Providing an Appropriate Funding Model The funding model is closely

  19. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  20. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  1. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  2. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (MAY 2014) (a) The Contractor shall use an earned value management system (EVMS...

  3. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  4. 48 CFR 970.5203-1 - Management controls.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Management controls. 970... for Management and Operating Contracts 970.5203-1 Management controls. As prescribed in 970.0370-2(a) and 970.3270(a)(4), insert the following clause: Management Controls (JUN 2007) (a)(1) The Contractor...

  5. 48 CFR 970.5203-1 - Management controls.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management controls. 970... for Management and Operating Contracts 970.5203-1 Management controls. As prescribed in 970.0370-2(a) and 970.3270(a)(4), insert the following clause: Management Controls (JUN 2007) (a)(1) The Contractor...

  6. 48 CFR 970.5203-1 - Management controls.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Management controls. 970... for Management and Operating Contracts 970.5203-1 Management controls. As prescribed in 970.0370-2(a) and 970.3270(a)(4), insert the following clause: Management Controls (JUN 2007) (a)(1) The Contractor...

  7. 48 CFR 970.5203-1 - Management controls.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Management controls. 970... for Management and Operating Contracts 970.5203-1 Management controls. As prescribed in 970.0370-2(a) and 970.3270(a)(4), insert the following clause: Management Controls (JUN 2007) (a)(1) The Contractor...

  8. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  9. 20 CFR 632.32 - Financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  10. 41 CFR 101-39.202 - Contractor authorized services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services... related GSA Interagency Fleet Management System (IFMS) services solely for official purposes. (b) To the... -leased equipment which is not controlled by a GSA IFMS fleet management center, or for authorized...

  11. 20 CFR 632.32 - Financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  12. Guidelines for cost control and analysis of cost-type research and development contracts

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  13. 48 CFR 970.0371-3 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... employed by the contractor, both full and part-time, who are assigned to work under a DOE management and...

  14. E-ELT requirements management

    NASA Astrophysics Data System (ADS)

    Schneller, D.

    2014-08-01

    The E-ELT has completed its design phase and is now entering construction. ESO is acting as prime contractor and usually procures subsystems, including their design, from industry. This, in turn, leads to a large number of requirements, whose validity, consistency and conformity with user needs requires extensive management. Therefore E-ELT Systems Engineering has chosen to follow a systematic approach, based on a reasoned requirement architecture that follows the product breakdown structure of the observatory. The challenge ahead is the controlled flow-down of science user needs into engineering requirements, requirement specifications and system design documents. This paper shows how the E-ELT project manages this. The project has adopted IBM DOORTM as a supporting requirements management tool. This paper deals with emerging problems and pictures potential solutions. It shows trade-offs made to reach a proper balance between the effort put in this activity and potential overheads, and the benefit for the project.

  15. The pioneer projects: Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  16. 48 CFR 923.903 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contractor Compliance With Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at.... Some DOE sites have a single Environmental Management System for the site while others have separate...

  17. 48 CFR 970.3770-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770-1 Policy. Contractors managing Department of Energy (DOE) facilities shall be required to comply with the DOE Directives applicable to facilities management. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  18. 48 CFR 52.223-19 - Compliance with Environmental Management Systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Management Systems. 52.223-19 Section 52.223-19 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.223-19 Compliance with Environmental Management Systems. As prescribed in 23.903, insert the following clause: Compliance With Environmental Management Systems (May 2011) The Contractor's...

  19. Ecuador project closes shop.

    PubMed

    1985-01-01

    The US Agency for International Development (AID) has discontinued its contraceptive social marketing project in Ecuador after 2 1/2 years without a sale. USAID had awarded a 3-year US$1.2 million grant to the program's contractor, the John Snow Public Health Group Inc. The project was run by Ecuador's national family planning association. This is only the 3rd time USAID has terminated a social marketing program since entering this field in 1973. Impediments to the program's operation included product price hikes and supply shortages as a result of teh inflation and currency devaluation in Ecuador in recent years. Government opposition to the sales of donated contraceptive supplies further set back the program. The name chosen for the condom distributed by the program, Liber, had to be changed since a company importing sanitary napkins was using the name Liberty and objected. The program's peculiar organizational structur is also considered to have played a role in the program's failure. Rather than having a single authority responsible for the program, a 2-headed organizational design was used. Program funds were controlled by the contractor, but the family planning organization managed day to day operations. Unified management has enabled programs in other countries to survive problems such as inflation, brand registration, and product and price approvals.

  20. Use of Coatings on Hydraulic Steel Structures: Part 1-Overview and Field Survey

    DTIC Science & Technology

    2016-09-01

    stripped out the coating. • On a gate, a contractor didn’t follow the specifications in the area of the rivets, leading to premature failure of...the coating. • On another gate, where polyurea was applied, the contractor missed the recoat window and unfortunately, the contractor was not forced...epaact1992controlofvocemissionsdistributionregssi374of1997. ht ml. Jackson, Joshua E. 2016. “Cost of Corrosion Annually in the U.S. Over $1.1 Trillion in

  1. 41 CFR 109-45.302-50 - Sales to DOE employees and designated contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY... otherwise unusable special, fitted clothing and other articles of personal property, acquired for the...

  2. 41 CFR 109-45.302-50 - Sales to DOE employees and designated contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY... otherwise unusable special, fitted clothing and other articles of personal property, acquired for the...

  3. WasteWise Resource Management: Innovative Solid Waste Contracting Methods

    EPA Pesticide Factsheets

    Resource management is an innovative contractual partnership between a waste-generating organization and a qualified contractor that changes the nature of current disposal services to support waste minimization and recycling.

  4. The Fifth Annual NASA/Contractors Conference on Quality and Productivity. Quality: A Commitment to the Future

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.

  5. Privatized Military Operations

    DTIC Science & Technology

    2006-01-01

    environment such as that in Abu Grahib prison , where military personnel tasked with similar duties to that of contractors have been held legally accountable... Grahib Prison . The Washington Post. Office of Management and Budget Circular A-76. (August 4, 1988. Revised 1999). Performance of Commercial...downsizes the military after the Global War on Terror as it did after the Cold War. Private contractors depend largely upon former service members to

  6. Government Furnished Property: Management and Accounting.

    DTIC Science & Technology

    1986-06-01

    PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION I(if applicable) %J 8c ADDRESS (City. State, anid ZIP Code) 10 SOURCE OF FUNDING NUMBERS e...DAR), Armed Services Procurement Regulation (ASPR), GAO aid service comptroller guidelines, and contract administration procedures. D. SCOPE OF STUDY...Contractor-acquired property is property procured or otherwise provided by the contractor for the performance of a . contract, title to which is vested in

  7. Contract Financing for Small Business

    DTIC Science & Technology

    1981-11-01

    problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs

  8. Expert Meeting Report: HVAC Fault Detection, Diagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  9. Expert Meeting Report: HVAC Fault Detection, DIagnosis, and Repair/Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  10. Report on {open_quotes}audit of internal controls over special nuclear materials{close_quotes}

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    The Department of Energy (Department) is responsible for safeguarding a significant amount of plutonium, uranium-233 and enriched uranium - collectively referred to as special nuclear materials - stored in the United States. The Department`s office of Nonproliferation and National Security has overall management cognizance for developing policies for safeguarding these materials, while other Headquarters program offices have {open_quotes}landlord{close_quotes} responsibilities for the sites where the materials are stored, and the Department`s operations and field offices provide onsite management of contractor operations. The Department`s management and operating contractors, under the direction of the Department, safeguard and account for the special nuclear materialmore » stored at Department sites.« less

  11. The new energy management policy: Indonesian PSC-gross-split applied on steam flooding project

    NASA Astrophysics Data System (ADS)

    Irham, S.; Julyus, P.

    2018-01-01

    “SIPY” oil field has been producing oil using steam flooding technology since 1992 under the PSC-Cost-Recovery policy. In 2021, the contract will be finished, and a new agreement must be submitted to the Indonesian government. There are two applied fiscal policies on oil and gas management: PSC-Cost-Recovery and PSC-Gross-Split (introduced in 2017 as the new energy management plan). The contractor must choose between PSC-Cost-Recovery and PSC-Gross-split which makes more profit. The aim of this research is to determine the best oil and gas contract policy for the contractor. The methods are calculating contractor cash flow and comparing the Profitability Indexes. The results of this study are (1) Net Present Values for the PSC-Cost-Recovery and the PSC-Gross-Split are 15 MMUS and 61 MMUS, respectively; and (2) Internal Rate of Return values for the PSC-Cost-Recovery and PSC-Gross-Split are 10% and 11%, respectively. The conclusion is that the Net Present Value and Internal Rate of Return of PSC-Gross-Split are greater than those of PSC-Cost-Recovery, but in Pay Out Time of PSC-Gross-split is longer than Pay Out Time in PSC-Cost-Recovery. Thus, the new energy management policy will be more attractive than PSC-Cost-Recovery.

  12. 48 CFR 18.102 - System for award management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management (SAM) database for contracts awarded to support unusual and compelling needs or emergency acquisitions. (See 4.1102). However, contractors are required to register with SAM in order to gain access to...

  13. 48 CFR 18.102 - System for award management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management (SAM) database for contracts awarded to support unusual and compelling needs or emergency acquisitions. (See 4.1102). However, contractors are required to register with SAM in order to gain access to...

  14. Program Manager: Journal of the Defense Systems Management College. Volume 19, Number 5, September-October 1990

    DTIC Science & Technology

    1990-10-01

    International Defense Cooperation Agreements; Quality Force Deployment; How Contractors See Systems Acquisition; DOD Metric Transition Plans and Actions; Proposals for Innovation In Service Quality . (sdw)

  15. Environmental Enterprise Risk Management Benefits for a Government Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linda Guinn

    An often overlooked advantage that an Environmental Enterprise Risk Management System (ERMS) has to organizations is the added protection from the Civil False Claims Act (FCA) for activities under a government contract.

  16. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be ensured; and, (6) The contractor's corporate approach to legal decision making. ... 10 Energy 4 2011-01-01 2011-01-01 false What information must be included in the legal management... Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  17. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  18. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  19. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  20. 28 CFR 34.110 - Management of peer reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Management of peer reviews. 34.110 Section 34.110 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.110 Management of peer reviews. A technical support contractor may assist in managing...

  1. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  2. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  3. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  4. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  5. 10 CFR 706.2 - Basis and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENERGY SECURITY POLICIES AND PRACTICES RELATING TO LABOR-MANAGEMENT RELATIONS General § 706.2 Basis and... objectives for labor-management relations in the DOE program, namely: (a) Wholehearted acceptance by... efficient management expected from DOE contractors; (e) Minimum interference with the traditional rights and...

  6. 48 CFR 22.101-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agencies to ensure a uniform Government approach concerning a particular plant or labor-management dispute... management and labor, notwithstanding the continuance of the dispute, to permit uninterrupted acquisition of... between labor and contractor management and not undertake the conciliation, mediation, or arbitration of a...

  7. Construction Management.

    ERIC Educational Resources Information Center

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  8. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to other performance requirements specified in the contract, DOE management and operating contractors... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwager, K.; Green, T. M.

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened,more » and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.« less

  10. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  11. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  12. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  13. 48 CFR 242.7301 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 242.7301 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Insurance/Pension Review.../Insurance Pension Review (CIPR). Defense Contract Management Agency (DCMA) insurance/pension specialists and...

  14. 48 CFR 242.7301 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 242.7301 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Insurance/Pension Review.../Insurance Pension Review (CIPR). Defense Contract Management Agency (DCMA) insurance/pension specialists and...

  15. Performance-Based Logistics, Contractor Logistics Support, and Stryker

    DTIC Science & Technology

    2007-06-15

    automotive , armament, missile, communications, special devices, and ground equipment repair. The essential maintenance task for the FMC is to maintain...technologies and welding techniques into their production processes. Finally, GDLS’s use of progressive management techniques and supply chain information...C4ISR, MEP) per the NMC criteria in the -10 manual, the contractors system only focuses on the platform or automotive status. Thus a vehicle “up” for

  16. Subcontracting Management Handbook

    DTIC Science & Technology

    1988-05-01

    nature Government involvement with subcontracto-s must be channeled through C.. 4prime contractor directed acti’ities. Thus. onlN the prime contractor...ae’quisit~o:3 and seconcily, ,.._ 12.* Logistics Cons’sdera- t4vocias shall ,emrforri acquixtiou p’’nn~rg and tiofls rojiduct market , suveys for i..l...quantities, and (8) Other factors such as future requirements, engineering, tooling, start- * work determined by the contracting ing load costs, market

  17. International space station wire program

    NASA Technical Reports Server (NTRS)

    May, Todd

    1995-01-01

    Hardware provider wire systems and current wire insulation issues for the International Space Station (ISS) program are discussed in this viewgraph presentation. Wire insulation issues include silicone wire contamination, Tefzel cold temperature flexibility, and Russian polyimide wire insulation. ISS is a complex program with hardware developed and managed by many countries and hundreds of contractors. Most of the obvious wire insulation issues are known by contractors and have been precluded by proper selection.

  18. Creating a competitive PSO: a case study.

    PubMed

    Calvaruso, J T

    1999-06-01

    Mount Carmel Health System, an integrated delivery system in Columbus, Ohio, became a Medicare+Choice contractor in response to unsatisfactory payment proposals from the Medicare contractors it serviced and to compete with the increasing number of managed care providers in its market. To meet HCFA's operational requirements, Mount Carmel upgraded and expanded its administrative and health information systems and solicited the support of its network physicians. It also developed a marketing strategy to promote its health plan. In the two years after instituting its provider-sponsored organization, Mount Carmel surpassed its original enrollment projections, decreased its patient management and utilization costs, and increased payments to its network members.

  19. Recovery Audit Contractor medical necessity readiness: one health system's journey.

    PubMed

    Scott, Judith A; Camden, Mindy

    2011-01-01

    To develop a sustainable approach to Recovery Audit Contractor medical necessity readiness that mitigates the regulatory and financial risks of the organization. Acute care hospitals. Utilizing the model for improvement and plan-do-study-act methodology, this health system designed and implemented a medical necessity case management program. We focused on 3 areas for improvement: medical necessity review accuracy, review timeliness, and physician adviser participation for secondary reviews. Over several months, we improved accuracy and timeliness of our medical necessity reviews while also generating additional inpatient revenue for the health system. We successfully enhanced regulatory compliance and reduced our financial risks associated with Recovery Audit Contractor medical necessity audits. A successful medical necessity case management program can not only enhance regulatory compliance and reduce the amount of payments recouped by Medicare, but also generate additional inpatient revenue for your organization. With health care reform and accountable care organizations on the horizon, hospitals must find ways to protect and enhance revenue in order to carry out their missions. This is one way for case managers to help in that cause, to advocate for the care of their patients, and to bring value to the organization.

  20. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... preclude START contractors from performing construction management services under other EPA contracts. (3... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and...

  1. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... preclude START contractors from performing construction management services under other EPA contracts. (3... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and...

  2. 41 CFR 109-27.5104-1 - Acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.51-Management of Precious Metals § 109-27.5104-1 Acquisitions. DOE organizations and contractors shall contact the Business Center for Precious Metals Sales and Recovery to determine the...

  3. 41 CFR 109-27.5104-1 - Acquisitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.51-Management of Precious Metals § 109-27.5104-1 Acquisitions. DOE organizations and contractors shall contact the Business Center for Precious Metals Sales and Recovery to determine the...

  4. Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

  5. Methodology to Estimate the Quantity, Composition, and ...

    EPA Pesticide Factsheets

    This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure. This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure.

  6. Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of Concept

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Big Data Analysis of Contractor Performance Information for Services...Director, Acquisition Career Management, ASN(RD&A) Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of...oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 398 - Big Data Analysis of Contractor Performance Information for Services Acquisition in

  7. Radon gas: contractor liability for an indoor health hazard.

    PubMed

    Shuko, C M

    1986-01-01

    Many families throughout the United States have recently detected dangerously high concentrations of radon gas inside their homes. Radon, a carcinogenic gas produced from uranium, has been discovered in structures overlying uranium-bearing rock. This discovery may result in litigation to determine contractor liability for building upon radon-releasing rock sites. This Note examines the strengths and weaknesses of the various theories of contractor liability and considers potential statutory claims under the Clean Air Act. The Note suggests, as an alternative approach to recovery, a proposed regulatory scheme and implementation plan.

  8. Tiger Team Assessment of the Ames Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    This report documents the Tiger Assessment of the Ames Laboratory (Ames), located in Ames, Iowa. Ames is operated for the US Department of Energy (DOE) by Iowa State University. The assessment was conducted from February 10 to March 5, 1992, under the auspices of the Office of Special Projects, Office of the Assistant Secretary of Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing Environment, Safety, and Health (ES H) disciplines; management practices; and contractor and DOE self-assessments. Compliance with applicable Federal, State of Iowa, and local regulations; applicable DOE Orders; best management practices; and internal requirements atmore » Ames Laboratory were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and the site contractor's management of ES H/quality assurance program was conducted.« less

  9. 41 CFR 102-118.90 - If my agency orders transportation and/or transportation services with a Government contractor...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false If my agency orders... the prepayment audit verification process), a prepayment audit can be used. As with all prepayment...

  10. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  11. 78 FR 70569 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice... Technical Mapping Advisory Council (TMAC). The notice incorrectly stated that contractors and potential...

  12. 41 CFR 109-1.5200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Scope of subpart. 109-1... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.52-Personal Property Management Program for Designated Contractors § 109-1.5200 Scope of subpart...

  13. 41 CFR 109-1.5200 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Scope of subpart. 109-1... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.52-Personal Property Management Program for Designated Contractors § 109-1.5200 Scope of subpart...

  14. 41 CFR 109-1.5200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of subpart. 109-1... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.52-Personal Property Management Program for Designated Contractors § 109-1.5200 Scope of subpart...

  15. 41 CFR 109-1.5200 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Scope of subpart. 109-1... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.52-Personal Property Management Program for Designated Contractors § 109-1.5200 Scope of subpart...

  16. 41 CFR 109-1.5200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Scope of subpart. 109-1... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.52-Personal Property Management Program for Designated Contractors § 109-1.5200 Scope of subpart...

  17. 41 CFR 105-72.508 - Contract provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... instances in which a contractor violates or breaches the contract terms, and provide for such remedial... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contract provisions. 105-72.508 Section 105-72.508 Public Contracts and Property Management Federal Property Management...

  18. 75 FR 56533 - Privacy Act System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... add one new system of records, FCC/OMD-23, ``Cadapult Space Management System (CSMS).'' The FCC's Space Management Center (SMC) in the Office of Managing Director (OMD) will use the CSMS information... and contractors following the FCC/National Treasury Union (NTEU) space assignment policy. In the event...

  19. 41 CFR 109-1.5202 - Establishment of a personal property holdings baseline.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... personal property holdings baseline. 109-1.5202 Section 109-1.5202 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT...-1.5202 Establishment of a personal property holdings baseline. (a) If the contractor is a new...

  20. 48 CFR 970.2902-3 - Other Federal tax exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is considered that a request for an additional exemption in the performance of a management and... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2902-3 Other Federal tax exemptions... such services when furnished to Department of Energy (DOE) management and operating contractors who pay...

  1. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE management and operating contractors may be paid a fee in accordance with the requirements of this subsection...

  2. Hazardous Waste and Wastewater Characterization Survey, Columbus AFB, Mississippi

    DTIC Science & Technology

    1988-06-01

    behind bldg 322 (Liquid Fuels Maintenance Branch). These wastes are then picked up by a waste oil contractor. All other drummed wastes are disposed of...is responsible for custody of the waste until a contractor (currently, Chemical Waste Management) comes to pick up the waste. Prior to disposal...chemicals are used up in the process. Any leftover chemicals are drained and stored in containers for use at a later time. All empty containers are

  3. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  4. Environmental liability and life-cycle management of used lubricating oils.

    PubMed

    Guerin, Turlough F

    2008-12-30

    Used oil handling, as a business, requires an extensive understanding by management that environmental liabilities exist through its supply chain. Findings from a review of the legal requirements of operating a used oil handling business were: understanding the transfer of ownership of used petroleum hydrocarbons is critical to any such business and how this is documented; used oil handlers are responsible for providing training to their staff, including site personnel and any third party waste contractors, and for communicating best practice procedures relating to the management of used petroleum hydrocarbons to all those individuals and organisations involved in business relationships that the used oil handling companies have; used oil handlers should audit the performance of any third party contractors that it engages to conduct work on behalf of its customers. Hypothetical situations of a company planning to enter the used oil handling market are described in relation to petroleum hydrocarbon wastes it handles to illustrate the range of potential liabilities. Companies proposing to establish a used oil handling business should ensure that they provide accurate advice to its employees, its customer's employees and to its third party contractors, all of which may be responsible for handling used petroleum hydrocarbons as part of the service it intends to provide, and that it has a well documented system addressing how environmental issues are managed.

  5. Sharing lessons learned and best practices in deactivation and decommissioning techniques among U.S. Department of Energy contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lackey, Michael B.; Waisley, Sandra L.; Dusek, Lansing G.

    2007-07-01

    Approximately $153.2 billion of work currently remains in the United States Department of Energy's (DOE's) Office of Environmental Management (EM) life cycle budget for United States projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and develop a knowledge management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. At the request of the DOE's EM Office of Engineering and Technology, the Energy Facility Contractors Group (EFCOG) responded to the challenge with formation of the Deactivation and Decommissioning (D and D) and Facilitymore » Engineering (DD/FE) Working Group. Since October 2006, members have already made significant progress in realizing their goals: adding new D and D best practices to the existing EFCOG Best Practices database; participating in lessons learned forums; and contributing to a DOE initiative on identifying technology needs. The group is also participating in a DOE project management initiative to develop implementation guidelines, as well as a DOE radiation protection initiative to institute a more predictable and standardized approach to approving authorized limits and independently verifying cleanup completion at EM sites. Finally, a D and D hotline to provide real-time solutions to D and D challenges is also being launched. (authors)« less

  6. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  7. Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.

    ERIC Educational Resources Information Center

    Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.

    2002-01-01

    Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…

  8. 76 FR 78673 - New Agency Information Collection Activity Under OMB Review: Exercise Information System (EXIS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ...- accessible knowledge-management system developed by TSA serving stakeholders--industry, port authorities... Management and Budget (OMB) for review and approval under the Paperwork Reduction Act (PRA). The ICR... comments. The first comment was from a contractor in the Infrastructure Protection Disaster Management...

  9. Early Warning Report: Use of Contractors to Conduct Clean Air Act Risk Management Program Inspections in Certain States Goes Against Court Decisions

    EPA Pesticide Factsheets

    Report #12-P-0376, March 28, 2012. The OIG is currently evaluating whether the EPA has adequate management controls for ensuring the effectiveness of its Clean Air Act (CAA) Section 112(r) risk management program inspections.

  10. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  11. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  12. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  13. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  14. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  15. 48 CFR 9904.406-60 - Illustrations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 9904.406-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-60 Illustrations. (a) A contractor allocates general management...

  16. 42 CFR 460.62 - Governing body.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Management and provision of all services, including the management of contractors. (4) Establishment of... participants. (7) Quality assessment and performance improvement program. (b) Participant advisory committee... provide the liaison to the governing body with meeting minutes that include participant issues. (c...

  17. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  18. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  19. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  20. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

Top