Sample records for contractors performing work

  1. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  2. 48 CFR 836.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  3. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  4. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  5. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  6. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  7. 48 CFR 52.222-23 - Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...

  8. 48 CFR 52.222-23 - Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...

  9. 48 CFR 52.236-1 - Performance of Work by the Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Performance of Work by the....236-1 Performance of Work by the Contractor. As prescribed in 36.501(b), insert the following clause... the work and customary or necessary specialty subcontracting (see 36.501(a)).] Performance of Work by...

  10. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  11. 48 CFR 742.1170-3 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to adequately monitor contractor performance (for example, the day-to-day working proximity of the... contractor is responsible for timely contract performance. Performance monitoring by USAID does not obviate... contracting officer, will determine how to monitor the contractor's performance to protect the Government's...

  12. 48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the entities are separately incorporated. (b) Subcontracts for performance of contract work itself (as distinguished from the purchase of supplies and services needed in connection with the performance of work... and operating contractor seeks authorization to have some part of the contract work performed by a...

  13. 48 CFR 970.5232-6 - Work for others funding authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... uncollectible receivables resulting from the Contractor utilizing contractor corporate funding for reimbursable... provide advance payment utilizing contractor corporate funds for reimbursable work to be performed by the... Laws, regulations, and DOE directives clause of this contract and such advance cannot be obtained. The...

  14. The nexus between OSH and subcontracting.

    PubMed

    Nunes, Isabel L

    2012-01-01

    Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.

  15. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas... contract, and for advising USAID regarding the performance of the work under the contract and its effect on... of academic freedom. Notwithstanding these academic freedoms, the Contractor's employees, while in...

  16. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less

  17. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  18. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  19. Advanced Sensors for TBI

    DTIC Science & Technology

    2016-12-01

    SMD-VAC- GP, Virtual Industries) with plastic tip. Then the chip was covered with silicone open-cell foam (0.062” thick, HT -870, Stockwell...the build. 26 We discussed with a sub- contractor in Livermore who might be able to perform the packaging assembly work. Dr. Kotovsky...worked with the sub- contractor on practice assemblies anticipating the new upcoming build. Working through an outside contractor represents an enormous

  20. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... providing new miner training, newly hired experienced miner training, new task training, and annual... which the contractor is aware that may be created by the performance of the contractor's work at the...

  1. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  2. 29 CFR 4.179 - Identification of contract work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Identification of contract work. 4.179 Section 4.179 Labor... Compliance with Compensation Standards § 4.179 Identification of contract work. Contractors and... workweek are engaged in performing work on such contracts. If such a contractor during any workweek is not...

  3. 29 CFR 4.146 - Contract obligations after award, generally.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... time spent by employees undertaking such training or phase-in work is considered to be hours worked on... thereunder only while the employees are performing on the contract, provided the contractor's records make clear the period of such performance. (See also § 4.179.) If employees of the contractor are required by...

  4. Civilian Workforce 2020: Strategies for Modernizing Human Resources Management in the Department of the Navy

    DTIC Science & Technology

    2000-08-18

    heavy reliance on contractors to perform much of the work performed by civilian employees . While this trend is expected to continue, a critical mass...manage, and, if necessary, terminate non- performing employees . Accountability measures should be clear and have consequences. ◆ Investments in human...complexity of work increas- es and the performance of industrial-type functions is shifted to contractors. The impact of this shift on the occupational

  5. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    NASA Astrophysics Data System (ADS)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  6. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  7. Report to Congress on the Indemnification of Contractors Performing Environmental Restoration. Appendices

    DTIC Science & Technology

    1994-01-07

    during the course of the work. A contractor could also be subject to federal or state orders compelling the cleanup of property , -3- including...government property , contaminated during the course of work. A contractor could also be held liable for the costs of remediating sites to which hazardous...parties under a variety of traditional tort theories, including strict liability, trespass, nuisance, and negligence, for personal injury or property

  8. 48 CFR 8.405-5 - Small business.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a size standard that corresponds to the work performed. Ordering activities should rely on the small... business, women-owned small business, or small disadvantaged business schedule contractor(s). GSA Advantage...

  9. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  10. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  11. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  12. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  13. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  14. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  15. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... of tier, for experimental, developmental, research, design, or engineering work to be performed by...

  16. Self Insuring against Asbestos Removal Risks.

    ERIC Educational Resources Information Center

    Slutzky, Lorence H.

    1987-01-01

    Asbestos removal is costly and many contractors have difficulty in obtaining insurance coverage. Presents a case for self insuring if contractors perform the removal work in compliance with state and federal regulations. Includes a reference list. (MD)

  17. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  18. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  19. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  20. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  1. 7 CFR 1788.47 - Policy requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...

  2. Construction and material specification

    DOT National Transportation Integrated Search

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  3. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...

  4. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...

  5. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...

  6. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...

  7. 48 CFR 22.406-4 - Apprentices and trainees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor's employment and payment records of apprentices and trainees made available pursuant to the clause... reject the classification and require the contractor to pay the affected employees at the rates applicable to the classification of the work actually performed. ...

  8. 48 CFR 22.406-4 - Apprentices and trainees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor's employment and payment records of apprentices and trainees made available pursuant to the clause... reject the classification and require the contractor to pay the affected employees at the rates applicable to the classification of the work actually performed. ...

  9. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  10. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  11. 48 CFR 252.209-7007 - Prohibited Financial Interests for Lead System Integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems... for the procurement of services, the primary purpose of which is to perform acquisition functions...

  12. 48 CFR 1409.506 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...

  13. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  14. 10 CFR 830.201 - Performance of work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Performance of work. 830.201 Section 830.201 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.201 Performance of work. A contractor must perform work in accordance with the safety basis for a hazard category 1, 2, or 3 DOE nuclear...

  15. 48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...

  16. 48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...

  17. 48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...

  18. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...

  19. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...

  20. 49 CFR 214.101 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of work on railroad bridges. (b) This subpart prescribes minimum railroad safety rules for... contractors performing work on railroad bridges. (d) Any working conditions involving the protection of railroad employees working on railroad bridges not within the subject matter addressed by this chapter...

  1. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  2. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  3. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  4. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  5. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  6. Central Contractor Registration Handbook (CCR)

    DTIC Science & Technology

    2002-03-01

    Assistance Center 888-227-2423 or 616-961-4725 Report Documentation Page Report Date 00/03/2002 Report Type N/A Dates Covered (from... to) - Title and......Work Unit Number Performing Organization Name(s) and Address(es) Central Contractor Registration Assistance Center (888-227-2423) or (616-961-4725

  7. 48 CFR 37.601 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...

  8. 48 CFR 37.601 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...

  9. 48 CFR 37.601 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...

  10. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of tier, for experimental, developmental, research, design, or engineering work to be performed by... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Patent Rights-Retention by the Contractor (Short Form). 1852.227-11 Section 1852.227-11 Federal Acquisition Regulations System...

  11. 48 CFR 27.404-6 - Inspection of data at the contractor's facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... regarding the limited rights or restricted rights status of the data, or for evaluating work performance... REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.404-6 Inspection of data at the contractor's facility. Contracting officers may obtain the right to...

  12. Afghanistan’s Road Infrastructure: Sustainment Challenges and Lack of Repairs Put U.S. Investment at Risk

    DTIC Science & Technology

    2016-10-01

    needs, the MOPW is beginning to use local Afghan contractors to perform road work, because they have fewer problems with insurgents than...international contractors . They noted that Afghanistan’s road infrastructure plays an important role in the country’s development and governance, and if the...road maintenance program. As part of the program, the MOPW was to transfer staff to the road maintenance unit, while USAID’s contractor was to

  13. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  14. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  15. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  16. 48 CFR 222.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors' facilities affected by work stoppages. 222.101-4 Section 222.101-4 Federal Acquisition... contractors' facilities affected by work stoppages. (a) When a contractor is unable to deliver urgent and critical items because of a work stoppage at its facility, the contracting officer, before removing any...

  17. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  18. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  19. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  20. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  1. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  2. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Award, renewal, and extension. (a) Effective work performance under management and operating contracts... requirements and the unusual (sometimes unique) nature of the work performed under management and operating contracts, the Government is often limited in its ability to effect competition or to replace a contractor...

  3. 48 CFR 32.304-3 - Asset formula.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... extent for the time actually necessary for contract performance, if the contractor's working capital and... guaranteed loans made primarily for working capital purposes, the agency shall normally limit the guarantee... entitled to payment on performance or termination. The formula shall exclude— (1) Amounts for which the...

  4. Should the U.S. Department of State Continue to Use Private Security Contractors to Protect U.S. Diplomats

    DTIC Science & Technology

    2008-06-13

    USE PRIVATE SECURITY CONTRACTORS TO PROTECT U.S. DIPLOMATS 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 6. AUTHOR( S ...Special Agent Derek Dela-Cruz 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Command and General Staff College...

  5. 48 CFR 1509.170-5 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...

  6. 48 CFR 1509.170-5 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...

  7. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  8. 48 CFR 27.405-1 - Special works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., books, studies, surveys, or similar documents that do not involve research, development, or experimental...; (3) Surveys of Government establishments; (4) Works pertaining to the instruction or guidance of... that resulting from research, development, or experimental work performed by the contractor), the early...

  9. 48 CFR 27.405-1 - Special works.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., books, studies, surveys, or similar documents that do not involve research, development, or experimental...; (3) Surveys of Government establishments; (4) Works pertaining to the instruction or guidance of... that resulting from research, development, or experimental work performed by the contractor), the early...

  10. 48 CFR 27.405-1 - Special works.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., books, studies, surveys, or similar documents that do not involve research, development, or experimental...; (3) Surveys of Government establishments; (4) Works pertaining to the instruction or guidance of... that resulting from research, development, or experimental work performed by the contractor), the early...

  11. 48 CFR 27.405-1 - Special works.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., books, studies, surveys, or similar documents that do not involve research, development, or experimental...; (3) Surveys of Government establishments; (4) Works pertaining to the instruction or guidance of... that resulting from research, development, or experimental work performed by the contractor), the early...

  12. 48 CFR 27.405-1 - Special works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., books, studies, surveys, or similar documents that do not involve research, development, or experimental...; (3) Surveys of Government establishments; (4) Works pertaining to the instruction or guidance of... that resulting from research, development, or experimental work performed by the contractor), the early...

  13. 48 CFR 1352.271-72 - Additional Item Requirements (AIR)-growth work

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance period. All growth work shall be paid at the prices stated in the Schedule. (b) The contractor... the first half of the contract period of performance. (2) No more than 50% of the hours during the third quarter of the contract period of performance. (3) No more than 30% of the hours during the fourth...

  14. 48 CFR 27.404-3 - Copyrighted works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Copyrighted works. 27.404... works. (a) Data first produced in the performance of a contract. (1) Generally, the contractor must obtain permission of the contracting officer prior to asserting rights in any copyrighted work containing...

  15. 48 CFR 27.404-3 - Copyrighted works.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Copyrighted works. 27.404... works. (a) Data first produced in the performance of a contract. (1) Generally, the contractor must obtain permission of the contracting officer prior to asserting rights in any copyrighted work containing...

  16. Evaluation of risk in change orders report for AKDOT construction staff.

    DOT National Transportation Integrated Search

    2009-06-01

    Work changes are common in construction contracts, especially for large projects. When contract changes must be made, how the owner : (the organization paying for the work) and the contractor (the firm performing the work) agree on a fair and reasona...

  17. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  18. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  19. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  20. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  1. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  2. Epileptic Seizure Forewarning by Nonlinear Techniques

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hively, L.M.

    2002-04-19

    This report describes work that was performed under a Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC (Contractor) and a commercial participant, VIASYS Healthcare Inc. (formerly Nicolet Biomedical, Inc.). The Contractor has patented technology that forewarns of impending epileptic events via scalp electroencephalograph (EEG) data and successfully demonstrated this technology on 20 datasets from the Participant under pre-CRADA effort. This CRADA sought to bridge the gap between the Contractor's existing research-class software and a prototype medical device for subsequent commercialization by the Participant. The objectives of this CRADA were (1) development of a combination of existing computer hardware andmore » Contractor-patented software into a clinical process for warning of impending epileptic events in human patients, and (2) validation of the epilepsy warning methodology. This work modified the ORNL research-class FORTRAN for forewarning to run under a graphical user interface (GUI). The GUI-FORTRAN software subsequently was installed on desktop computers at five epilepsy monitoring units. The forewarning prototypes have run for more than one year without any hardware or software failures. This work also reported extensive analysis of model and EEG datasets to demonstrate the usefulness of the methodology. However, the Participant recently chose to stop work on the CRADA, due to a change in business priorities. Much work remains to convert the technology into a commercial clinical or ambulatory device for patient use, as discussed in App. H.« less

  3. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart applies to contracts with either profit or nonprofit organizations, including nonprofit... engineering and technical direction work performed by a contractor that does not have overall contractual...

  4. 48 CFR 245.7310-2 - Performance bond.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Performance bond. 245.7310..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Sale of Surplus Contractor Inventory 245.7310-2 Performance bond. Performance bonds are required when work, other than loading, is to be performed by the...

  5. 48 CFR 2052.215-70 - Key personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are considered to be essential to the successful performance of the work hereunder: * The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with..., or is expected to become, unavailable for work under this contract for a continuous period exceeding...

  6. 48 CFR 52.249-10 - Default (Fixed-Price Construction).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government may, by written notice to the Contractor, terminate the right to proceed with the work (or the... the work within the specified time, whether or not the Contractor's right to proceed with the work is..., whether or not the Contractor's right to proceed with the work is terminated. This liability includes any...

  7. Energize New York -- Residential Energy Efficiency Market Transformation in New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bregman, Thomas M.

    2013-12-31

    Energize New York (ENY) is focused on addressing known barriers to widespread energy efficiency (EE) adoption by property owners. In simple terms ENY works to; 1) increase homeowner trust by using known and trusted community leaders to communicate their own positive experiences with EE and ENY, 2) reduce friction points by integrating support staff and creative use of technology that ease a homeowner’s way forward through the EE upgrade process, 3) increase homeowner knowledge and trust of specific EE benefits through access to the ENY energy coach, 4) provide information on available financing options that show benefits (e.g. positive cashmore » flow), and 5) provide tools and mechanisms that give homeowners greater comfort in evaluating and selecting the right contractor. These five fundamental program aspects are supported by a hyper-local communications and outreach model and a “lead by example” philosophy that requires community leaders to step forward and model energy efficiency behavior by example. In the communities where the program has successfully engaged local leadership and “trusted community sources” there has been a significant increase in the uptake of energy efficiency work. Quantitatively this growth translated into an increase of 240% in completed Home Performance projects from the two year pre-pilot period (2009-10) to the two year post-pilot period (2012-13). Additionally, the program has seen measureable increases in the output and performance of contractors who are members of the Energize Comfort Corps, a program innovation which included a subset of the NYSERDA approved and Building Performance Institute accredited home performance contractors. This innovation, launched in the later stages of the pilot, is paired with the Energize Contractor Ratings Index (CRI) and helps frame the provider market by giving homeowners a mechanism to provide and receive feedback on their contractor experience. The data incorporated into the CRI along with the ECC selection process, has measurably reduced a key decision barrier (“which contractor should I use”) for homeowners engaged in the EE decision making process.« less

  8. 48 CFR 1509.170-4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...

  9. 77 FR 70780 - Federal Acquisition Regulation; Submission for OMB Review; Contractors Performing Private...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United States... new information collection requirement concerning Contractors Performing Private Security Functions... identified by Information Collection 9000- 0184, Contractors Performing Private Security Functions Outside...

  10. 48 CFR 1553.209-70 - EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Contracting Officer's Evaluation of Contractor Performance. 1553.209-70 Section 1553.209-70 Federal... 1553.209-70 EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance. As prescribed... evaluation of Contractor performance. ...

  11. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  12. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  13. 77 FR 43039 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the United.... 110-181, enacted January 28, 2008), section 862, entitled ``Contractors Performing Private Security... NDAA required standardization of rules for private security contractors that are performing in...

  14. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  15. 78 FR 37670 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ...] RIN 9000-AM20 Federal Acquisition Regulation; Contractors Performing Private Security Functions...-181). Section 862, entitled ``Contractors Performing Private Security Functions in Areas of Combat...), as amended, entitled ``Contractors Performing Private Security Functions in Areas of Combat...

  16. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Award, renewal, and extension. (a) Effective work performance under management and operating contracts... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of... rights to involve itself, if necessary, in technical and managerial decisionmaking concerning performance...

  17. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  18. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  19. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  20. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  1. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  2. 42 CFR 403.740 - Condition of participation: Staffing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: Education, training, and performance evaluation. (1) The RNHCI must ensure that staff (including contractors and other individuals working under arrangement) have the necessary education and training concerning... to, training related to the individual job description, performance expectations, applicable...

  3. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...

  4. 48 CFR 5231.205-90 - Shipbuilding capability preservation agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... an incentive for a shipbuilder to obtain new private sector work, thereby reducing the Navy's cost of... agreement permits the contractor to claim certain indirect costs attributable to its private sector work as... subsection, means an additional indirect cost that results from performing private sector work described in a...

  5. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  6. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  7. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  8. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...., engineering costs and costs of obsolete or reperformed work). (2) Costs of added distinct work caused by the...) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work... possible need to revise their accounting procedures to comply with the cost segregation requirements of the...

  9. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  10. 36 CFR 1254.104 - How does NARA determine fees to prepare documents for microfilming?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... benefits) and supply costs when we perform the work. When a NARA contractor performs the work, the fees are... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false How does NARA determine fees to prepare documents for microfilming? 1254.104 Section 1254.104 Parks, Forests, and Public Property...

  11. 48 CFR 52.236-13 - Accident Prevention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (NOV 1991) (a) The Contractor shall provide and maintain work environments and procedures which will (1... delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient... corrective action, the Contracting Officer may issue an order stopping all or part of the work until...

  12. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  13. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  14. 48 CFR 1422.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITIONS Basic Labor Policies 1422.101-4 Removal of items from contractors' facilities affected by work... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1422.101-4 Section 1422.101-4 Federal Acquisition...

  15. Region 7 Laboratory Information Management System

    EPA Pesticide Factsheets

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  16. 48 CFR 2052.235-71 - Safety, health, and fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of the work under this contract to protect the health and safety of its employees and of members... hazards to life and property. The contractor shall comply with all applicable health, safety, and fire... an order stopping all or any part of the work. Thereafter, a start work order for resumption of work...

  17. 48 CFR 970.1504-1-7 - Fee base.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development, or Environmental Management work to be performed. Special equipment purchases shall be addressed... represents the cost of the Production, Research and Development, or Environmental Management work to be... part of the estimated cost of capital equipment (other than special equipment) which the contractor...

  18. 48 CFR 52.227-3 - Patent Indemnity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) arising out of the manufacture or delivery of supplies, the performance of services, or the construction, alteration, modification, or repair of real property (hereinafter referred to as construction work) under... or construction work. (b) This indemnity shall not apply unless the Contractor shall have been...

  19. 48 CFR 52.227-3 - Patent Indemnity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) arising out of the manufacture or delivery of supplies, the performance of services, or the construction, alteration, modification, or repair of real property (hereinafter referred to as construction work) under... or construction work. (b) This indemnity shall not apply unless the Contractor shall have been...

  20. 48 CFR 52.227-3 - Patent Indemnity.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) arising out of the manufacture or delivery of supplies, the performance of services, or the construction, alteration, modification, or repair of real property (hereinafter referred to as construction work) under... or construction work. (b) This indemnity shall not apply unless the Contractor shall have been...

  1. 48 CFR 52.227-3 - Patent Indemnity.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) arising out of the manufacture or delivery of supplies, the performance of services, or the construction, alteration, modification, or repair of real property (hereinafter referred to as construction work) under... or construction work. (b) This indemnity shall not apply unless the Contractor shall have been...

  2. 48 CFR 252.217-7006 - Title.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of a job order shall vest in the Government upon delivery at the location specified for the performance of the work. (b) Upon completion of the job order, or with the approval of the Contracting Officer during performance of the job order, all Contractor-furnished materials and equipment not incorporated in...

  3. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...

  4. Matthew Eash | NREL

    Science.gov Websites

    Eash Matthew Eash Data Architect Matthew.Eash@nrel.gov | Matthew is a contractor in the Hadoop & Spark in tandem with High Performance Computing Systems. Matthew works with a wide range of

  5. Injury experience in coal mining, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reich, R.B.; Hugler, E.C.

    1994-05-01

    This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1992. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less

  6. Injury experience in coal mining, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1991-01-01

    This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1990. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less

  7. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department of Defense (DoD...) to implement provisions of law limiting the periods allowed for contractor comments on past....S.C. 2302 Note). Section 853, entitled ``Inclusion of Data on Contractor Performance in Past...

  8. 48 CFR 1852.227-70 - New technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (4) The Contractor... National Aeronautics and Space Administration (NASA) or duly authorized representative. Contract, as used... work under any NASA contract or in the performance of any work that is reimbursable under any clause in...

  9. 48 CFR 1852.227-70 - New technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (4) The Contractor... National Aeronautics and Space Administration (NASA) or duly authorized representative. Contract, as used... work under any NASA contract or in the performance of any work that is reimbursable under any clause in...

  10. 48 CFR 1852.227-70 - New technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov. (4) The Contractor... National Aeronautics and Space Administration (NASA) or duly authorized representative. Contract, as used... work under any NASA contract or in the performance of any work that is reimbursable under any clause in...

  11. 48 CFR 252.247-7006 - Removal of contractor's employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... use only experienced, responsible, and capable people to perform the work. The Contracting Officer may... continued employment under this contract is inconsistent with the interest of military security. (End of...

  12. 48 CFR 52.236-7 - Permits and Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... negligence. The Contractor shall also be responsible for all materials delivered and work performed until...

  13. Evaluation of Factors Unique to Multifunction Controls/Displays Devices

    DTIC Science & Technology

    1980-11-01

    different Iron Report) 18. SUPPLEMENTARY NOTES This work was performed by the contractor at the Flight Dynamics Laboratory, Flight Control Division, Crew...This Technical Report is the result of a work effort performed by the Require- ments and Analysis Group of the Crew Systems Development Branch (FIGR...human factors. Mr. Emmett Herron of the Bunker Ramo Corporation provided pilot inputs to the work efforts, and Ms. Gloria Calhoun of the same company

  14. 29 CFR 778.6 - Effect of Davis-Bacon Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mechanics employed by contractors and subcontractors performing construction activity on Federal and federally assisted projects. Laborers and mechanics performing work subject to such predetermined minimum... the Fair Labor Standards Act to such laborers and mechanics in any workweek when they are subject to...

  15. 29 CFR 778.6 - Effect of Davis-Bacon Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... mechanics employed by contractors and subcontractors performing construction activity on Federal and federally assisted projects. Laborers and mechanics performing work subject to such predetermined minimum... the Fair Labor Standards Act to such laborers and mechanics in any workweek when they are subject to...

  16. 29 CFR 778.6 - Effect of Davis-Bacon Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... mechanics employed by contractors and subcontractors performing construction activity on Federal and federally assisted projects. Laborers and mechanics performing work subject to such predetermined minimum... the Fair Labor Standards Act to such laborers and mechanics in any workweek when they are subject to...

  17. 29 CFR 778.6 - Effect of Davis-Bacon Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanics employed by contractors and subcontractors performing construction activity on Federal and federally assisted projects. Laborers and mechanics performing work subject to such predetermined minimum... the Fair Labor Standards Act to such laborers and mechanics in any workweek when they are subject to...

  18. 29 CFR 778.6 - Effect of Davis-Bacon Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... mechanics employed by contractors and subcontractors performing construction activity on Federal and federally assisted projects. Laborers and mechanics performing work subject to such predetermined minimum... the Fair Labor Standards Act to such laborers and mechanics in any workweek when they are subject to...

  19. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  20. 48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...

  1. 48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...

  2. 48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...

  3. 48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...

  4. 48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...

  5. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...

  6. 25 CFR 256.20 - How are these repairs or construction trades persons, home building contractors, or construction...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... statement of work, which identifies the work to be performed. The appropriate contracting office uses the... completing the project as advertised. (a) Payments to the winning bidder are negotiated in the contract and... the completed work. (2) Final payment will be made after final inspection and after all provisions of...

  7. 48 CFR 27.404-3 - Copyrighted works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Data are of the type that the agency itself distributes to the public under an agency program; (iv... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.404-3 Copyrighted works. (a) Data first produced in the performance of a contract. (1) Generally, the contractor must...

  8. 48 CFR 27.404-3 - Copyrighted works.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Data are of the type that the agency itself distributes to the public under an agency program; (iv... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.404-3 Copyrighted works. (a) Data first produced in the performance of a contract. (1) Generally, the contractor must...

  9. 75 FR 54524 - Defense Federal Acquisition Regulation Supplement; Guidance on Personal Services (DFARS Case 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... parts 211 and 237 are being amended to (1) require that statements of work or performance work statements clearly distinguish between Government employees and contractor employees and (2) ensure that... Department, including several checklists currently used. This interim rule adopts best practices and...

  10. Key aspects in managing safety when working with multiple contractors: A case study.

    PubMed

    Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.

  11. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  12. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  13. 48 CFR 907.307 - Appeals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING Contractor Versus Government Performance 907.307 Appeals. An appeal of a decision to convert to contract or to continue in-house performance may be made by an affected party. Appeals shall be... A-76, and be supported by appropriate documentation. Appeals must be delivered within 15 working...

  14. 48 CFR 1852.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Direction (SEP 1993) (a) Performance of the work under this contract is subject to the written technical... the Contracting Officer in writing in accordance with NASA FAR Supplement 1842.270. “Technical... in writing by the COTR. (d) The Contractor shall proceed promptly with the performance of technical...

  15. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...

  16. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...

  17. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...

  18. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...

  19. 48 CFR 2452.209-72 - Organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., contractual or other interests are such that: (1) Award of the contract may result in an unfair competitive advantage; or (2) The Contractor's objectivity in performing the contract work may be impaired. (b) The...

  20. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  1. Ada Software Design Methods Formulation.

    DTIC Science & Technology

    1982-10-01

    cycle organization is also appropriate for another reason. The source material for the case studies is the work of the two contractors who participated in... working version of the system exist. The integration phase takes the pieces developed and combines them into a single working system. Interfaces...hardware, developed separately from the software, is united with the software, and further testing is performed until the system is a working whole

  2. 48 CFR 452.237-76 - Progress Reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the contract performance. The progress report shall be brief and factual and shall be prepared in... report, sequence number of report, and period of performance being reported; (3) Contractor's name and... task or other logical segment of work on which effort was expended during the report period. The...

  3. 48 CFR 236.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of contractor...

  4. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  5. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  6. 48 CFR 452.215-71 - Instructions for the Preparation of Technical and Business Proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contained in the technical proposal so that the contractor's understanding of the statement of work may be... required if appropriate.) (2) Business Proposal. (a) Furnish financial statements for the last two years... specified in the statement of work. Any “alternate” proposal may be considered if overall performance would...

  7. 48 CFR 1352.271-79 - Liability and insurance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Insurance (APR 2010) (a) The contractor shall exercise reasonable care and use its best efforts to prevent accidents, injury or damage to all employees, persons and property, in and about the work, and to the vessel... at the plant or elsewhere, arising or growing out of the performance of the work, except where the...

  8. 42 CFR 51c.503 - Application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...

  9. 42 CFR 51c.503 - Application.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...

  10. 42 CFR 51c.503 - Application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...

  11. 42 CFR 51c.503 - Application.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...

  12. Schedule of average annual equipment ownership expense

    DOT National Transportation Integrated Search

    2003-03-06

    The "Schedule of Average Annual Equipment Ownership Expense" is designed for use on Force Account bills of Contractors performing work for the Illinois Department of Transportation and local government agencies who choose to adopt these rates. This s...

  13. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...

  14. Selected DOE headquarters publications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-07-01

    Selected DOE Headquarters Publications provides cumulative listings, from October 1, 1977 onward, of two groups of publications issued by headquarters organizations of the Department of Energy, and an index to their title keywords. The two groups consist of publications assigned a DOE/XXX-type report number code and headquarters contractor publications, prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department. Publications such as pamphlets, fact sheets, bulletins, newsletters, and telephone directories, are omitted, as are publications issued under the DOE-tr, CONF, DOE/JPL, and DOE/NASA codes. (RWR)

  15. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  16. 48 CFR 1509.170-7 - Release of ratings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of... contacting the EPA contracting officer responsible for the evaluation. (b) Contractors' performance ratings... contract is located. Requests for past performance evaluations during the period the information may be...

  17. Space plasma contractor research, 1988

    NASA Technical Reports Server (NTRS)

    Williams, John D.; Wilbur, Paul J.

    1989-01-01

    Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.

  18. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  19. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  20. 48 CFR 252.225-7039 - Contractors performing private security functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by Contractors performing private security functions; (A) All armored vehicles, helicopters, and... private security functions. 252.225-7039 Section 252.225-7039 Federal Acquisition Regulations System... security functions. As prescribed in 225.370-6, insert the following clause: CONTRACTORS PERFORMING PRIVATE...

  1. 48 CFR 1509.170-7 - Release of ratings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Performance System will have direct access to all Reports, including those of EPA, in the National Institutes of Health's database. Information on EPA contractors' performance ratings may also be obtained by... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of...

  2. 48 CFR 370.205 - Tribal preference requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements. 370.205 Section 370.205 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting Opportunities 370.205 Tribal preference requirements. (a) When the contractor will perform work...

  3. Percentage compensation arrangements: suspect, but not illegal.

    PubMed

    Fedor, F P

    2001-01-01

    Percentage compensation arrangements, in which a service is outsourced to a contractor that is paid in accordance with the level of its performance, are widely used in many business sectors. The HHS Office of Inspector General (OIG) has shown concern that these arrangements in the healthcare industry may offer incentives for the performance of unnecessary services or cause false claims to be made to Federal healthcare programs in violation of the antikickback statute and the False Claims Act. Percentage compensation arrangements can work and need not run afoul of the law as long as the healthcare organization carefully oversees the arrangement and sets specific safeguards in place. These safeguards include screening contractors, carefully evaluating their compliance programs, and obligating them contractually to perform within the limits of the law.

  4. 29 CFR 779.233 - Independent contractors performing work “for” an enterprise.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Apply; Enterprise Coverage Leased Departments, Franchise and Other Business Arrangements § 779.233... section 3(r) has reference to an independent business which performs services for other businesses as an established part of its own business activities. The term “independent contractor” as used in 3(r) thus has...

  5. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor Performance System (CPS). 642.1503-70 Section 642.1503-70 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503...

  6. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  7. 40 CFR 35.4210 - Must my group solicit and document bids for our procurements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4210 Must my group solicit and... the work; (ii) Provide potential sources in the scope of work to be performed and the criteria your...

  8. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  9. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    NASA Astrophysics Data System (ADS)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  10. Evaluation of a Participatory Ergonomics Intervention in Small Commercial Construction Firms

    PubMed Central

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T.; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A.

    2017-01-01

    Background Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Methods Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short term and intermediate impacts and long term outcomes from surveys and field records. Results Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers’ knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. Conclusions The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. PMID:27094450

  11. Contractor Performed Quality Control on KyTC Projects.

    DOT National Transportation Integrated Search

    2002-08-01

    This report addresses issues related to transferring the responsibility for quality control from the Kentucky Transportation Cabinet (KyTC) to construction contractors. : Several key topics related to Contractor Performed Quality Control (CPQC) are p...

  12. 48 CFR 1509.170-2 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 1509.170-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-2 Purpose. This subpart provides guidance to program and contracting personnel regarding the evaluation of contractor performance. It...

  13. FAQ | Efficient Windows Collaborative

    Science.gov Websites

    climate and your pocketbook. Sometimes a homeowner feels more comfortable with a particular contractor contractor to describe the installation process. Make sure your contractor knows as much about ENERGY STAR , you will have to work with the builder or a contractor to correct the problem. If the leak is between

  14. 48 CFR 852.237-70 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  15. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  16. Analysis of non-fatal and fatal injury rates for mine operator and contractor employees and the influence of work location.

    PubMed

    Karra, Vijia K

    2005-01-01

    Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.

  17. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  18. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  19. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  20. 48 CFR 1509.170-1 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-1 Section 1509.170-1 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-1 Scope of subpart. This subpart establishes EPA policy and procedures for evaluation of contractor performance...

  1. 48 CFR 1509.170-3 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...

  2. 48 CFR 3052.209-75 - Prohibited financial interests for lead system integrators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems. (4... procurement of services, the primary purpose of which is to perform acquisition functions closely associated...

  3. 75 FR 34260 - Federal Acquisition Regulation; FAR Case 2005-040, Electronic Subcontracting Reporting System (eSRS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... documented as past performance for future acquisitions.'' Response: Partially concur. The Councils do not... in FAR 19.704(a)(2) should be revised to read ``Submit a new commercial plan, 30 working days before... performance. Response: Non-concur. Although it is essential that the Central Contractor Registration, the...

  4. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Change order accounting... CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.203 Change order accounting procedures. (a) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work...

  5. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  6. 48 CFR 1509.170-6 - Filing of forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...

  7. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... work to the General Agent's home office by the most expeditious manner of communication. (f) In... the Contractor's guarantee liability extends to defects and deficiencies in the Contractor's work developing within sixty (60) days from the date of the acceptance of all the work and the accepted redelivery...

  8. Staffing for Cyberspace Operations: Summary of Analysis

    DTIC Science & Technology

    2016-08-01

    appropriate total force mix, defined as the choice between military, civilian, and contractor performance of DoD activities, is a key component in this...designated for civilian performance if the requirement is inherently governmental or subject to least-cost government civilian or contractor performance if...activities open to the least costly performance type (government civilian or contractor ). To understand the CMF mission requirements, we studied existing

  9. Issues With Access to Acquisition Data and Information in the Department of Defense

    DTIC Science & Technology

    2017-01-01

    both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackay, Alexander; Fryar, Scotty; Doane, Alan

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was dischargedmore » and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)« less

  11. 48 CFR 2922.101-4 - Removal of items from contractor facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF LABOR SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Basic Labor Policies 2922.101-4 Removal of items from contractor facilities affected by work...

  12. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  13. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  14. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  15. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  16. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  17. 48 CFR 1552.211-74 - Work assignments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement type term form contracts when work assignments are to be used. Work Assignments (APR 1984) (a) The... assignment or similar tasking document, the Contractor shall provide a conflict of interest certification... directly related to a site, the Contractor is only required to provide a conflict of interest certification...

  18. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Profit. (a) The TCO shall allow profit on preparations made and work done by the contractor for the..., factors to be considered include— (1) Extent and difficulty of the work done by the contractor as compared with the total work required by the contract (engineering estimates of the percentage of completion...

  19. Evaluation of a participatory ergonomics intervention in small commercial construction firms.

    PubMed

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A

    2016-06-01

    Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short-term and intermediate impacts and long-term outcomes from surveys and field records. Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers' knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. Am. J. Ind. Med. 59:465-475, 2016. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  20. Can half-day trainings motivate small contractors to address lead safety?

    PubMed

    Harrington, David; Scholz, Peter; Lomax, Geoffrey; Stahlschmidt, Hans; Vannoy, Jim; Materna, Barbara

    2004-07-01

    There is a real need to educate small painting and remodeling contractors about lead-safe work practices to protect the health of occupants (especially small children) and employees. From 1996 to 2000, 34 half-day lead awareness trainings were held throughout California to increase contractors' use of lead-safe practices. Educational methods included focusing on best practices, utilizing a peer educator, and working with stakeholders to do outreach to this hard-to-reach audience. We report on the evaluation of 18 of these seminars where we found that 30% to 49% of the interviewed contractors began doing many of the lead-safe work practices after attendance. We conclude that this program can have a modest impact in areas that contractors are more familiar with; new areas not part of their experience do not fare as well. However, without a more integrated public health educational and enforcement strategy, educational efforts such as ours can have only a limited impact.

  1. 48 CFR 852.246-75 - Warranty for construction-guarantee period services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... comply with the contract, terminate the right to proceed with the work (or the separable part of the work... complete the work within this specified time, whether or not the contractor's right to proceed with the... contractor fail to prosecute the work or fail to proceed promptly to provide guarantee period services after...

  2. 49 CFR 26.11 - What records do recipients keep and report?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... universe of DBE and non-DBE contractors and subcontractors who seek to work on your Federally-assisted... estimate of the universe of DBE and non-DBE contractors and subcontractors who seek to work on your...

  3. Afghan National Army: DOD Has Taken Steps to Remedy Poor Management of Vehicle Maintenance Program

    DTIC Science & Technology

    2016-07-01

    contract and program were designed to promote the accurate assessment of Afghan vehicle maintenance needs, contractor performance, and cost...containment; (2) the U.S. government provided effective management and oversight of contractor performance; and (3) the contract met its program objectives...maintenance, (2) underestimated the cost of spare parts, and (3) established performance metrics that did not accurately assess contractor performance or

  4. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for... Conflicts of Interest for Contractor Employees Performing Acquisition Functions by any of the following...

  5. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  6. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...

  7. 40 CFR 52.2352 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...

  8. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... an equal basis with other companies. (b) The Contractor will be ineligible to enter into a contract... subcontract under an EPA contract, which supports EPA's performance of Superfund Headquarters policy work... contract requires access to proprietary or confidential business or financial data of other companies, and...

  9. 48 CFR 1252.217-73 - Inspection and manner of doing work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  10. 48 CFR 1252.217-73 - Inspection and manner of doing work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  11. 48 CFR 1252.217-73 - Inspection and manner of doing work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  12. 48 CFR 1252.217-73 - Inspection and manner of doing work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  13. 48 CFR 1252.217-73 - Inspection and manner of doing work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  14. 14 CFR 1274.504 - Competition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... alert to organizational conflicts of interest as well as noncompetitive practices among contractors that... contractor performance and eliminate unfair competitive advantage, contractors that develop or draft...

  15. ACHP | Working Together to Build a More Inclusive Preservation Program

    Science.gov Websites

    Manager. He has over a decade of experience in the construction industry as a contractor and project working on my Masters, I was employed by an Athens, GA-based general contractor who specialized in

  16. 23 CFR Appendix B to Subpart A of... - Training Special Provisions

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the event that a contractor subcontracts a portion of the contract work, he shall determine how many... among the work classifications on the basis of the contractor's needs and the availability of journeymen... each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an...

  17. 23 CFR Appendix B to Subpart A of... - Training Special Provisions

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the event that a contractor subcontracts a portion of the contract work, he shall determine how many... among the work classifications on the basis of the contractor's needs and the availability of journeymen... each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an...

  18. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  19. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  20. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  1. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  2. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  3. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  4. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1976.

    DTIC Science & Technology

    1976-11-26

    section in which each contractor is located and his rank. The locations shown are those where the work was expected to be performed. Generally , the...CORP 151 B ACUPEX CORP * 72 P eENOTX CORP 2qi 8 AERCOYNE RESEARCH INC t 3’. 8 BENDIX FIELD IENGINEERING CORP 13 R AFRCJET GENERAL CORP * 42R 8 810...GFNQRAL ELECTRIC CO 33P 9 OCTY ASSCCTATFS 3 4q P GFNRFAL IkSTPUMFNT COOP 421 N DUXF UNIVERSITY * R1 P GENERAL MfTORS CORP 55 R DYNLFCTrPON CORP * 6? P

  5. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  6. Langley's Space Shuttle Technology: A bibliography

    NASA Technical Reports Server (NTRS)

    Champine, G. R.

    1981-01-01

    This bibliography documents most of the major publications, research reports, journal articles, presentations, and contractor reports, which have been published since the inception of the Space Shuttle Technology Task Group at the NASA Langley Reseach Center on July 11, 1969. This research work was performed in house by the Center staff or under contract, monitored by the Center staff. The report is arranged according to method of publication: (1) NASA Formal Reports; (2) Contractor Reports; and (3) Articles and Conferences. Disciplines covered are in the areas of aerothermodynamics, structures, dynamics and aeroelasticity, environmental, and materials. The publications are listed without abstracts for quick reference and planning.

  7. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  8. 48 CFR 35.004 - Publicizing requirements and expanding research and development sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obtain a broad base of the best contractor sources from the scientific and industrial community, agencies... information on sources (including small business concerns) competent to perform R&D work. These efforts should... and expanding research and development sources. 35.004 Section 35.004 Federal Acquisition Regulations...

  9. 75 FR 68330 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... with DoD 4145.26-M, DoD Contractors' Safety Manual for Ammunition and Explosives, and minimize risk of mishaps; [cir] Identify the place of performance of all ammunition and explosives work; and [cir] Ensure... Conventional Arms, Ammunition, and Explosives. In addition, this information collection requires DoD...

  10. 48 CFR 2052.216-73 - Accelerated task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the work, the contractor shall proceed with performance of the task order subject to the monetary... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Accelerated task order....216-73 Accelerated task order procedures. As prescribed at 2016.506-70(b), the contracting officer may...

  11. 14 CFR 1245.102 - Definitions and terms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... National Aeronautics and Space Administration (NASA) or another Government agency on NASA's behalf... including NASA grants awarded under the authority of 42 U.S.C. 1891-1893. (b) Contractor means the party who has undertaken to perform work under a contract or subcontract. (c) Invention includes any art, method...

  12. 29 CFR 780.331 - Crew leaders and labor contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Employment in Agriculture That Is Exempted From the Minimum Wage and Overtime Pay Requirements Under Section... Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR STATEMENTS... performance of work by his crew and his authority to determine the wage rates paid to his workers. (c) There...

  13. 48 CFR 1552.237-70 - Contract publication review procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... publish, in a scientific journal, material resulting directly or indirectly from work performed under this... in a journal article which has not been subjected to EPA review: “Although the research described in....” (3) Following publication of the journal article, the Contractor shall submit five copies of the...

  14. Report of the Defense Science Board/Air Force Scientific Advisory Board Joint Task Force on Acquisition of National Security Space Programs

    DTIC Science & Technology

    2003-05-01

    space requires both contractors---at least until sustainable performance is demonstrated • EELV program has occurred in highly cost constrained...both contractors • Take necessary actions to assure both contractors remain viable---at least until sustainable performance is demonstrated

  15. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... electronically by use of the National Institutes of Health's Contractor Performance System. Hard copy preparation... Service Center with specific instructions if hard copy use becomes necessary. (b) The performance...

  16. 27 CFR 70.231 - Protection for certain interests even though notice filed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... notice of tax lien was filed before the mechanic undertook the work or that the mechanic knew of the lien before undertaking the work. (f) Real property tax and special assessment liens. Even though a notice of... filed before the contractor undertakes the work or that the contractor knew of the lien before...

  17. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  18. 32 CFR 324.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... levels, and contractor personnel working with personal data comply with the DFAS Privacy Act Program. (2... personnel and contractors working with personal data comply with the Privacy Act Program. (2) Serves as the... Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM...

  19. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  20. 48 CFR 1845.506-70 - Responsibilities of the plant clearance officer.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performance in property disposal activities; (h) Determining the method of disposal; (i) Surveillance of any contractor conducted sales; (j) Accounting for all contractor inventory reported by the contractor; (k... inventory; (l) Approving the method of sale, evaluating bids, and approving sale prices for any contractor...

  1. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  2. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  3. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  4. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  5. 12 CFR 367.9 - Imputation of causes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...

  6. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  7. 75 FR 38683 - Federal Acquisition Regulation; FAR Case 2008-035, Registry of Disaster Response Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... Response Contractors AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and... of a registry of disaster response contractors. DATES: Effective Date: August 2, 2010. FOR FURTHER..., requires the establishment and maintenance of a registry of contractors willing to perform debris removal...

  8. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  9. 32 CFR 324.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... levels, and contractor personnel working with personal data comply with the DFAS Privacy Act Program. (2... personnel and contractors working with personal data comply with the Privacy Act Program. (2) Serves as the... identifiable personal information is for a necessary and lawful purpose, that the information is current and...

  10. Summary of Environmental Data Analysis and Work Performed by Lawrence Livermore National Laboratory (LLNL) in Support of the Navajo Nation Abandoned Mine Lands Project at Tse Tah, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taffet, Michael J.; Esser, Bradley K.; Madrid, Victor M.

    This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRPmore » and its contractors that was not contained in the contract work scope.« less

  11. 48 CFR 52.241-9 - Connection Charge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... connection charge, shall be and remain the property of the Contractor and shall, at all times during the life... Contractor shall pay to the Government an amount equal to the uncredited balance of the connection charge as... right, the Contractor shall be paid the cost of any work accomplished, including direct and indirect...

  12. Sandia National Laboratories: Working with Sandia: Procurement:

    Science.gov Websites

    Payrolls Before you can submit a timecard you must enter your employees. Please see the Contractor Job Aid link for that specific contract. Please refer to the Contractor Job Aid (MS Word)for further @sandia.gov. Contractor ES&H ES&H for Construction & Service Contracts 01065 Construction Standard

  13. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  14. 48 CFR 752.7031 - Leave and holidays.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... services. Leave and Holidays (OCT 1989) (a) Vacation leave. (1) The Contractor may grant to its employees working under this contract vacations of reasonable duration in accordance with the Contractor's practice for its employees, but in no event shall such vacation leave be earned at a rate exceeding 26 work...

  15. 48 CFR 752.7031 - Leave and holidays.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services. Leave and Holidays (OCT 1989) (a) Vacation leave. (1) The Contractor may grant to its employees working under this contract vacations of reasonable duration in accordance with the Contractor's practice for its employees, but in no event shall such vacation leave be earned at a rate exceeding 26 work...

  16. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  17. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  18. 48 CFR 22.1704 - Violations and remedies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...

  19. 48 CFR 22.1704 - Violations and remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...

  20. 48 CFR 22.1704 - Violations and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...

  1. 48 CFR 22.1704 - Violations and remedies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...

  2. 48 CFR 22.1704 - Violations and remedies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...

  3. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 436.201 Evaluation of contractor performance. Preparation of performance evaluation reports. In addition to the requirements of FAR 36.201, performance evaluation reports shall be prepared for indefinite... of services to be ordered exceeds $500,000.00. For these contracts, performance evaluation reports...

  4. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  5. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  6. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  7. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  8. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  9. 48 CFR 52.222-50 - Combating Trafficking in Persons.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... an employee of the Contractor directly engaged in the performance of work under the contract who has... another person would suffer serious harm or physical restraint; or (3) By means of the abuse or threatened... not enter into or continue in such conditions, that person or another person would suffer serious harm...

  10. 48 CFR 52.222-6 - Davis-Bacon Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or nearly so, to the performance of a contract. (b)(1) All laborers and mechanics employed or working... contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics... fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics...

  11. 48 CFR 52.222-6 - Davis-Bacon Act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or nearly so, to the performance of a contract. (b)(1) All laborers and mechanics employed or working... contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics... fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics...

  12. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  13. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  14. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  15. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  16. 48 CFR 3052.217-92 - Inspection and manner of doing work (USCG).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... submission of offer, and shall be intended and approved for marine use. (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. (c) The..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  17. 48 CFR 3052.217-92 - Inspection and manner of doing work (USCG).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... submission of offer, and shall be intended and approved for marine use. (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. (c) The..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  18. 48 CFR 3052.217-92 - Inspection and manner of doing work (USCG).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... submission of offer, and shall be intended and approved for marine use. (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. (c) The..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  19. 48 CFR 3052.217-92 - Inspection and manner of doing work (USCG).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... submission of offer, and shall be intended and approved for marine use. (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. (c) The..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  20. 48 CFR 3052.217-92 - Inspection and manner of doing work (USCG).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... submission of offer, and shall be intended and approved for marine use. (2) When Navy specifications are specified in the contract, the Contractor shall follow Navy standards of material and workmanship. (c) The..., American Bureau of Shipping, or Department of the Navy for the type of welding being performed...

  1. Regular Topologies for Gigabit Wide-Area Networks: Congestion Avoidance Testbed Experiments. Volume 3

    NASA Technical Reports Server (NTRS)

    Denny, Barbara A.; McKenney, Paul E., Sr.; Lee, Danny

    1994-01-01

    This document is Volume 3 of the final technical report on the work performed by SRI International (SRI) on SRI Project 8600. The document includes source listings for all software developed by SRI under this effort. Since some of our work involved the use of ST-II and the Sun Microsystems, Inc. (Sun) High-Speed Serial Interface (HSI/S) driver, we have included some of the source developed by LBL and BBN as well. In most cases, our decision to include source developed by other contractors depended on whether it was necessary to modify the original code. If we have modified the software in any way, it is included in this document. In the case of the Traffic Generator (TG), however, we have included all the ST-II software, even though BBN performed the integration, because the ST-II software is part of the standard TG release. It is important to note that all the code developed by other contractors is in the public domain, so that all software developed under this effort can be re-created from the source included here.

  2. Means of Effective Security Sector Reform: A Comparison of US Military and Contractor Programs

    DTIC Science & Technology

    2011-05-19

    the US Army took over 400 suspension / debarment actions in fiscal year 2010.65 GAO report 11-419T, Foreign Operations: Key Issues for Congressional...Contracting, Ensuring Contractor Accountability: Past Performance and Suspension & Debartment, Testimony, (Washington, D.C.: Commission on Wartime...64 Ibid., 8. 65 Commission on Wartime Contracting, Ensuring Contractor Accountability: Past Performance and Suspension

  3. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  4. A Study of Inverse Methods for Processing of Radar Data

    DTIC Science & Technology

    2006-10-01

    AFRL-HE-BR-SR-2006-0010 A STUDY OF INVERSE METHODS FOR PROCESSING OF RADAR DATA Mohamed F. Chouikha, Ph.D. Howard University Department of Electrical...WORK UNIT NUMBER 7184X04B 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Howard University Dept of...AVAILABILITY STATEMENT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED. 13. SUPPLEMENTARY NOTES Final report delivered by the Howard University contractor

  5. 48 CFR 2942.1503 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...

  6. 48 CFR 2942.1503 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...

  7. 48 CFR 2942.1503 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...

  8. 48 CFR 2942.1503 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...

  9. 48 CFR 2942.1503 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...

  10. Improvement of force health protection through preventive medicine oversight of contractor support.

    PubMed

    Mower, Scott A

    2009-01-01

    Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.

  11. Checklist of Safe Work Practices for Spray Polyurethane Foam (SPF) for Contractors, Incluyendo la Versión de Español

    EPA Pesticide Factsheets

    A contractor checklist aimed at helping spray polyurethane foam (SPF) professional contractors protect themselves, workers and others. Guía de las prácticas seguras en el lugar de trabajo para la aplicación del aerosol de espuma aislante de poliuretano.

  12. 48 CFR 52.246-19 - Warranty of Systems and Equipment under Performance Specifications or Design Criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... or refusal of the Contractor to— (A) Present a detailed recommendation for corrective action as... the Contractor must remedy the failure or refusal specified in the notice. (6) If the Contractor does... entitled to reimbursement from the Contractor, or from the proceeds, for the reasonable expenses of care...

  13. 48 CFR 52.246-19 - Warranty of Systems and Equipment under Performance Specifications or Design Criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or refusal of the Contractor to— (A) Present a detailed recommendation for corrective action as... the Contractor must remedy the failure or refusal specified in the notice. (6) If the Contractor does... entitled to reimbursement from the Contractor, or from the proceeds, for the reasonable expenses of care...

  14. The experiences of security industry contractors working in Iraq: an interpretative phenomenological analysis.

    PubMed

    Messenger, Katy; Farquharson, Lorna; Stallworthy, Pippa; Cawkill, Paul; Greenberg, Neil

    2012-07-01

    To explore the occupational experiences of private security contractors working in a war zone and how it impacts on their mental health. Semistructured interviews were conducted with seven contractors employed by a large UK-based private security company. Interpretative phenomenological analysis was used to analyze the interview transcripts. Participants also completed the 12-item General Health Questionnaire and the Posttraumatic Stress Disorder Checklist. Four overarching themes emerged: the appeal of the job; vulnerability; keep going; and seeking help for stress in the workplace. No clinically significant levels of distress were reported. Contractors are frequently exposed to stressors known to increase risk of psychiatric difficulty in military personnel. A number of potential protective factors were identified. Only a minority of participants were open to seeking help for mental health difficulties.

  15. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-15

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive materialmore » contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.« less

  16. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    DTIC Science & Technology

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  17. Seeing Glass Contractors Clearly.

    ERIC Educational Resources Information Center

    Deliberato, Jerry

    2003-01-01

    Offers seven tips for finding and working with an effective glass contractor. For example, schools should consider the company's reputation and longevity of service, and whether it has in-house engineering capabilities. (EV)

  18. Cold air investigation of 4 1/2-stage turbine with stage loading factor of 4.66 and high specific work output. 1: Overall performance

    NASA Technical Reports Server (NTRS)

    Whitney, W. J.; Behning, F. P.; Moffitt, T. P.; Hotz, G. M.

    1977-01-01

    The turbine developed design specific work output at design speed at a total pressure ratio of 6.745 with a corresponding efficiency of 0.855. The efficiency (0.855)was 3.1 points lower than the estimated efficiency quoted by the contractor in the design report and 0.7 of a point lower than that determined by a reference prediction method. The performance of the turbine, which was a forced vortex design, agreed with the performance determined by the prediction method to about the same extent as did the performance of three reference high stage loading factor turbines, which were free vortex designs.

  19. Asbestos: Protect Your Family

    MedlinePlus

    ... properly cleaned. If You Hire an Asbestos Professional Contractor Before work begins, get a written contract specifying ... applicable federal, state, and local regulations which the contractor must follow (such as notification requirements, removal, handling ...

  20. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

    DOT National Transportation Integrated Search

    2014-08-01

    State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...

  1. 48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...

  2. 48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...

  3. 48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...

  4. 48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...

  5. Seaworthy Quantum Key Distribution Design and Validation (SEAKEY)

    DTIC Science & Technology

    2016-03-10

    Contractor Address: 10 Moulton Street, Cambridge, MA 02138 Title of the Project: Seaworthy Quantum Key Distribution Design and Validation (SEAKEY...Technologies Kathryn Carson Program Manager Quantum Information Processing 2 | P a g e Approved for public release; distribution is...we have continued work calculating the key rates achievable parametrically with receiver performance. In addition, we describe the initial designs

  6. 41 CFR 102-72.69 - What additional terms and conditions apply to an Executive agencies' delegation of ancillary...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... liability and property damage insurance policies to cover claims arising from or relating to the contractor... liability, either directly or indirectly, for any contractual claims or disputes that arise out of or relate to the performance of ancillary repair and alteration work, except to the extent such claim or...

  7. 76 FR 2762 - Proposed Information Collection (VAAR Clause 852.236.91, Special Notes) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... support claims for price adjustment due to delay in construction caused by severe weather. DATES: Written... facilities available to perform the work. The clause also requires contractors submitting a claim for price adjustment due to severe weather delay to provide climatologically data covering the period of the claim and...

  8. 78 FR 37667 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ...-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013-008 Davis. to... Contracting Integrity, an internal DoD panel, consists of senior-level DoD officials from across DoD working... contractor performance. This final rule is not required to be published for public comment because it only...

  9. 78 FR 37698 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ............ Contracting with 2013-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013... panel, consists of senior-level DoD officials from across DoD working to review progress made by DoD to... ensure that CORs understand their duties and responsibilities to survey contractor performance. This...

  10. 48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...

  11. 48 CFR 951.101 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 951.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.101 Policy. (a) It is Department of Energy (DOE) policy that contractors performing under cost-reimbursement contracts should meet...

  12. Contractor assistance in highway maintenance : state-of-the-art evaluation.

    DOT National Transportation Integrated Search

    1980-01-01

    The purpose of this study was to perform a state-of-the art evaluation of contractor assistance in Virginia's highway maintenance. The study revealed that expenditures for contractor assistance accounted for 2.79% of the total expenditure on ordinary...

  13. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... delivery schedules. (32) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors... performance in the areas of design, development, and production. (41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development...

  14. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  15. Pooling knowledge and improving safety for contracted works at a large industrial park.

    PubMed

    Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo

    2015-01-01

    At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.

  16. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  17. 48 CFR 742.1502 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...

  18. 48 CFR 742.1502 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...

  19. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief

    DOT National Transportation Integrated Search

    2014-01-01

    State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation dep...

  20. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  1. Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of Concept

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Big Data Analysis of Contractor Performance Information for Services...Director, Acquisition Career Management, ASN(RD&A) Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of...oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 398 - Big Data Analysis of Contractor Performance Information for Services Acquisition in

  2. Measure Guideline: Guide to Attic Air Sealing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lstiburek, Joseph

    2014-09-01

    The purpose of this measure guideline is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy, health, safety, and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to themore » work that needs to be done.« less

  3. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  4. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  5. 32 CFR 199.15 - Quality and utilization review peer review organization program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Director, OCHAMPUS. These contractors may include contractors that have exclusive functions in the area of utilization and quality review, fiscal intermediary contractors (which perform these functions along with a... functions concerning management of the delivery and financing of health care services under CHAMPUS...

  6. Defense Contracting: Key Data Not Routinely Used in Progress Payment Reviews

    DTIC Science & Technology

    1992-01-14

    the amount of pay- By .ments based on the fair value of undelivered work. Contractors may Distibtion ] submit requests for progress payments monthly and...exceed the Federal Acquisition Regulation limitations. These checks are based on contractor data and include the fair value and the loss ratio tests. The... fair value test is intended to ensure that progress payments for work in process do not exceed the value of that work. The loss ratio test is intended

  7. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Performance System (CPS) maintained by the National Institutes of Health. CPS is an Internet-based tool... with access to the Internet shall use CPS to evaluate contractor's past performance for all contracts... the CPS; or (2) At overseas locations where access to the Internet is not practicable. (d) Heads of...

  8. 77 FR 197 - Federal Acquisition Regulation; Public Access to the Federal Awardee Performance and Integrity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...), excluding past performance reviews, shall be made publicly available. The interim rule notified contractors... not making ``past performance information'' available. Further, the respondent feared that it is only a matter of time before the Government also allows the public access to Government contractor ``past...

  9. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  10. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  11. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  12. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  13. 48 CFR 442.1502 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...

  14. 25 CFR 900.186 - Is it necessary for a self-determination contract to include any clauses about Federal Tort...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN... services contracts with the contractor to provide health care services) are deemed to be employees of the Federal government while performing work under this contract. This status is not changed by the source of...

  15. 2012 financial outlook: physicians and podiatrists.

    PubMed

    Schaum, Kathleen D

    2012-04-01

    Although the nationally unadjusted average Medicare allowable rates have not increased or decreased significantly, the new codes, the new coding regulations, the NCCI edits, and the Medicare contractors' local coverage determinations (LCDs) will greatly impact physicians' and podiatrists' revenue in 2012. Therefore, every wound care physician and podiatrist should take the time to update their charge sheets and their data entry systems with correct codes, units, and appropriate charges (that account for all the resources needed to perform each service or procedure). They should carefully read the LCDs that are pertinent to the work they perform. If the LCDs contain language that is unclear or incorrect, physicians and podiatrists should contact the Medicare contractor medical director and request a revision through the LCD Reconsideration Process. Medicare has stabilized the MPFS allowable rates for 2012-now physicians and podiatrists must do their part to implement the new coding, payment, and coverage regulations. To be sure that the entire revenue process is working properly, physicians and podiatrists should conduct quarterly, if not monthly, audits of their revenue cycle. Healthcare providers will maintain a healthy revenue cycle by conducting internal audits before outside auditors conduct audits that result in repayments that could have been prevented.

  16. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... determinations in FAR subpart 9.1 and the impact of a contractor with more than one contract to have a negative... forecasting and cost controlling and the impact on future contracts. This respondent felt that a contractor... (including potential economic, environmental, public health and safety effects, distributive impacts, and...

  17. Assessment and Develop the Saudi's Contractors Classification System

    ERIC Educational Resources Information Center

    Almutairi, Saud

    2017-01-01

    Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors' capabilities, and prevent underperformance. Through this study, a survey was conducted among…

  18. 77 FR 10508 - Agency Information Collection Activities; Proposed Collection; Comment Request; Background Checks...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Activities; Proposed Collection; Comment Request; Background Checks for Contractor Employees (Renewal) AGENCY... the electronic docket, go to www.regulations.gov . Title: Background Checks for Contractor Employees... consolidated in 40 CFR part 9. Abstract: The EPA uses contractors to perform services throughout the nation...

  19. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  20. Report: Lack of Project Plan Resulted in Transition and Contractor Performance Problems for the Institutional Controls Tracking System

    EPA Pesticide Factsheets

    Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.

  1. Safety and health concerns for KYTC and the contractor personnel.

    DOT National Transportation Integrated Search

    2004-09-01

    This study was initiated to provide a review of safety and health issues related to Kentucky Transportation Cabinet (KYTC) construction activities including both KYTC and contractor personnel. Work included a literature search, interviews with KYTC r...

  2. Advanced Orion Optimized Laser System Analysis

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contractor shall perform a complete analysis of the potential of the solid state laser in the very long pulse mode (100 ns pulse width, 10-30 hz rep-rate) and in the very short pulse mode (100 ps pulse width 10-30 hz rep rate) concentrating on the operation of the device in the 'hot-rod' mode, where no active cooling the laser operation is attempted. Contractor's calculations shall be made of the phase aberrations which develop during the repped-pulse train, and the results shall feed into the adaptive optics analyses. The contractor shall devise solutions to work around ORION track issues. A final report shall be furnished to the MSFC COTR including all calculations and analysis of estimates of bulk phase and intensity aberration distribution in the laser output beam as a function of time during the repped-pulse train for both wave forms (high-energy/long-pulse, as well as low-energy/short-pulse). Recommendations shall be made for mitigating the aberrations by laser re-design and/or changes in operating parameters of optical pump sources and/or designs.

  3. 45 CFR 2543.43 - Competition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The recipient shall be alert to organizational conflicts of interest as well as noncompetitive... to ensure objective contractor performance and eliminate unfair competitive advantage, contractors...

  4. 48 CFR 1552.216-77 - Award term incentive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance measures for the corresponding evaluation period; or (iii) The Government notifies the contractor....216-77 Section 1552.216-77 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY...) based on overall contractor performance as evaluated in accordance with the Clause entitled “Award Term...

  5. 48 CFR 552.236-83 - Requirement for a Project Labor Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... “Project Labor Agreement” (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a project and the union(s) agree on... Contractor shall, after contract award, enter into a PLA for performance of [Insert project or contract name...

  6. 48 CFR 52.249-8 - Default (Fixed-Price Supply and Service).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... beyond the control and without the fault or negligence of the Contractor. Examples of such causes include... beyond the control and without the fault or negligence of the Contractor. (d) If the failure to perform... the control of both the Contractor and subcontractor, and without the fault or negligence of either...

  7. P-8A Poseidon Multi-Mission Maritime Aircraft (P-8A)

    DTIC Science & Technology

    2013-12-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...2013 rated the P-8A as operationally effective , operationally suitable, and recommended Fleet introduction. Integrated testing of deficiency...lot through effective negotiations with the prime contractor and through development and implementation of production process improvement

  8. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories

    DTIC Science & Technology

    2012-11-01

    Research , Development, Test , and Evaluation (RDT&E) Appropriations The RDT&E appropriation consists of the mission program budgets for all... research , development, test and evaluation work performed by contractors and government installations and includes an installations and activities budget...than $4,000,000. 9 f. Research , Development, Test , and Evaluation Appropriations The Research , Development, Test , and Evaluation (RDT&E

  9. Adaptive Interfaces

    DTIC Science & Technology

    1991-03-01

    Project Engineer: Sharon M. Walter/COES/(315) 330-7650 Prime Contractor: lIT Research Institute (IITRI) 12a. DISTRIBUTION/AVAILABIUTY STATEMENT 12b...F30602- 87-D-0094. This contract is with IIT Research Institute (IITRI) and is sponsored by the Rome Air Development Center. The work was performed by... Research Institute (IITRI) and Rome Air Development Center (RADC) this Final Report for Project 7288, Adaptive Interfaces, Task A. This report is

  10. Putting EVM to the Test

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald; Counts, Stacy

    2005-01-01

    IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

  11. 48 CFR 970.0371-4 - Gratuities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-4 Gratuities. Employees of a management and operating contractor shall not, under... contractor is doing business, or proposing to do business, in accomplishing the work under the contract...

  12. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  13. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  14. 41 CFR Appendix A to Part 60 - 250-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...

  15. 41 CFR Appendix A to Part 60 - 250-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...

  16. 41 CFR Appendix A to Part 60 - 250-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...

  17. 41 CFR Appendix A to Part 60 - 250-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...

  18. Private Sector Adds to the Menu.

    ERIC Educational Resources Information Center

    Donovan, Sharon

    1997-01-01

    Two school districts, Kennewick School District WA and Salem-Keizer School District OR, are leveraging their food service contractor's resources to establish work-based courses stressing sophisticated management, culinary, and life skills. Under these instructional partnerships, the contractor, cooperating with school officials, develops the…

  19. Automotive Energy Efficiency Program - Presented Papers at the Contractors Coordination Meeting, January 15-17, 1975

    DOT National Transportation Integrated Search

    1975-06-01

    This volume contains working papers presented at the Contractors Coordination Meeting of the Automotive Energy Efficiency Program held at the DOT Transportation Systems Center, January 15-17, 1975. This program is the Federal Government's major effor...

  20. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  1. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  2. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2 Government... acquired at or below the simplified acquisition threshold conform to contract quality requirements before... the contractor's internal work processes. In making the determination, the contracting officer shall...

  3. Case Studies in Educational Performance Contracting. Part 3. Texarkana, Arkansas; Liberty-Eylau, Texas.

    ERIC Educational Resources Information Center

    Carpenter, Polly; And Others

    The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…

  4. 48 CFR 42.1501 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. Past... commitment to customer satisfaction; the contractor's reporting into databases (see subparts 4.14 and 4.15...

  5. 48 CFR 42.1501 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. Past... commitment to customer satisfaction; the contractor's reporting into databases (see subparts 4.14 and 4.15...

  6. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...

  7. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    PubMed

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  8. 22 CFR 518.43 - Competition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... organizational conflicts of interest as well as noncompetitive practices among contractors that may restrict or eliminate competition or otherwise restrain trade. In order to ensure objective contractor performance and...

  9. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  10. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  11. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... for disagreeing. (3) The Contracting Officer will evaluate the Contractor's response and notify the...

  12. Selection of infectious medical waste disposal firms by using the analytic hierarchy process and sensitivity analysis.

    PubMed

    Hsu, Pi-Fang; Wu, Cheng-Ru; Li, Ya-Ting

    2008-01-01

    While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derived to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.

  13. Employee Involvement - White-Collar Work Force

    DTIC Science & Technology

    1993-01-01

    a currently valid OMB control number. 1. REPORT DATE JAN 1993 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Employee ...Involvement - White-Collar Work Force 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...34Persons acting on behalf of the Maritime Administration" includes any employee , contractor, or subcontractor to the contractor of the Maritime

  14. 48 CFR 217.7404-6 - Allowable profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ensure the profit allowed reflects— (a) Any reduced cost risk to the contractor for costs incurred during contract performance before negotiation of the final price; (b) The contractor's reduced cost risk for costs incurred during performance of the remainder of the contract; and (c) The requirements at 215.404...

  15. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  16. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  17. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  18. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  19. 48 CFR 9.308-1 - Testing performed by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...

  20. 48 CFR 1252.216-71 - Determination of award fee.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...

  1. 48 CFR 1252.216-71 - Determination of award fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...

  2. 48 CFR 1252.216-71 - Determination of award fee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...

  3. 48 CFR 1252.216-71 - Determination of award fee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...

  4. 48 CFR 1252.216-71 - Determination of award fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...

  5. 40 CFR 160.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.10... services of a consulting laboratory, contractor, or grantee to perform all or a part of a study to which this part applies, it shall notify the consulting laboratory, contractor, or grantee that the service...

  6. 40 CFR 792.10 - Applicability to studies performed under grants and contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS General... person utilizes the services of a consulting laboratory, contractor, or grantee to perform all or a part of a study to which this part applies, it shall notify the consulting laboratory, contractor, or...

  7. The Department of Defense’s Use of Private Security Contractors in Iraq and Afghanistan: Background, Analysis, and Options for Congress

    DTIC Science & Technology

    2010-06-22

    Congress has generally accepted the concept of using unarmed contractors to carry out support functions in military operations, such as providing food and...countries where stability generally is not an issue. 3 According to one report, “Not since the 17th century has there been such a reliance on private...Institution has estimated that citizens of some 30 countries have worked as security contractors in Iraq.6 PSC employees are generally divided by

  8. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  9. 48 CFR 32.104 - Providing contract financing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...) If the contractor is a small business concern, the contracting officer must give special attention to... competency from the Small Business Administration has no bearing on the contractor's need for or entitlement...

  10. 41 CFR Appendix A to Part 60 - 300-Guidelines on a Contractor's Duty To Provide Reasonable Accommodation

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performing his or her job. 1. A contractor is required to make reasonable accommodations to the known... qualified with respect to that process. One is “otherwise qualified” if he or she is qualified for a job... the job's essential functions. 2. Although the contractor would not be expected to accommodate...

  11. MV-22 Squadron Organization: A Different Way to Support

    DTIC Science & Technology

    2017-06-09

    acquisitions process, contractors have become an integral part in the support of daily MV-22...perform. MCAS New River has several teams of contract maintainers that are sent to individual squadrons on a daily basis.6 As the need for contractors ...has increased, more jobs have become available to qualified maintainers. This actually increases the need for even more contractors , as qualified

  12. Defense AT and L Magazine. Vol. 45, no. 5, September-October 2016

    DTIC Science & Technology

    2016-09-01

    standard federal assistance awards. These contractors might be small, startup technology firms supported by venture capital, leading-edge technology...to provide effective contract oversight and present an accurate picture of contractor performance to the procuring contracting office. Lesson...mission footprints encompass a great deal of contractor activity, leadership that is not regularly engaged with the acquisition team often gives

  13. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...

  14. Westinghouse, DOE see apples, oranges in IG staffing report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lobsenz, G.

    1994-03-01

    The operator of the Energy Department's Savannah River weapons plant has at least 1,800 more employees than it needs, and could save $400 million over a five-year period by cutting its staff accordingly, a DOE inspector general study says. Most of the boat - 1,206 employees - was attributed to excessive numbers of managers, with the inspector general concluding that Westinghouse Savannah River Co. had roughly twice as many layers of management than two other DOE weapons contractors. The study also concluded that Westinghouse in fiscal year 1992 significantly understated its actual staffing levels in reports to DOE, failing tomore » disclose 1,765 full-time employees or the equivalent hours worked. Through such underreporting Westinghouse was able to [open quotes]circumvent staffing ceilings established by the department,[close quotes] the study added. Overall, DOE Inspector General John Layton said Westinghouse's staff levels substantially exceeded those needed for efficient operation of the South Carolina nuclear weapons facility. Layton based his analysis on efficiency standards attained by other DOE weapons plant contractors, such as Martin Marietta Energy Systems at DOE's Oak Ridge, Tenn., plant and EG G Rocky Flats, as well as widely utilized worker performance requirements used by the Navy and private sector companies that perform work similar to that done at Savannah River.« less

  15. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  16. Highlights of contractor initiatives in quality enhancement and productivity improvement

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  17. So You Have Asthma

    MedlinePlus

    ... prohibits discrimination on the basis of age by contractors and subcontractors in the perform- ance of Federal ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...

  18. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action... work under the contract. This includes the right to direct the Contractor to remove its most senior key...

  19. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action... work under the contract. This includes the right to direct the Contractor to remove its most senior key...

  20. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action... work under the contract. This includes the right to direct the Contractor to remove its most senior key...

  1. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action... work under the contract. This includes the right to direct the Contractor to remove its most senior key...

  2. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  3. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  4. Writing the Right Contract: Getting What You Want.

    ERIC Educational Resources Information Center

    Finkel, Karen E.

    1998-01-01

    Outsourcing of school services creates a need for educators to learn how best to select a contractor. Contracted student transportation is used to illustrate flexibility and creativity in writing a request for proposal, the evaluation process, and the importance of contractors' willingness to work alongside the district as a genuine business…

  5. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  6. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  7. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  8. 48 CFR 731.205-6 - Compensation for personal services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... whom the contractor will be working. (b) Salaries and wages. It is USAID policy that if an employee's... Contractor Salary Threshold (USAID CST), as stated in USAID's Automated Directives System (ADS) Chapter 302 USAID Direct Contracting (available at http://www.usaid.gov/policy/ads/300/302.pdf), it will be...

  9. 48 CFR 731.205-6 - Compensation for personal services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... whom the contractor will be working. (b) Salaries and wages. It is USAID policy that if an employee's... Contractor Salary Threshold (USAID CST), as stated in USAID's Automated Directives System (ADS) Chapter 302 USAID Direct Contracting (available at http://www.usaid.gov/policy/ads/300/302.pdf), it will be...

  10. 48 CFR 731.205-6 - Compensation for personal services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... whom the contractor will be working. (b) Salaries and wages. It is USAID policy that if an employee's... Contractor Salary Threshold (USAID CST), as stated in USAID's Automated Directives System (ADS) Chapter 302 USAID Direct Contracting (available at http://www.usaid.gov/policy/ads/300/302.pdf), it will be...

  11. 48 CFR 252.217-7005 - Inspection and manner of doing work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... time of Contractor's submission of bid (or acceptance of the job order, if negotiated). (2) When Navy specifications are specified in the job order, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever applicable. (c) The Government may...

  12. 48 CFR 252.217-7005 - Inspection and manner of doing work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... time of Contractor's submission of bid (or acceptance of the job order, if negotiated). (2) When Navy specifications are specified in the job order, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever applicable. (c) The Government may...

  13. 48 CFR 252.217-7005 - Inspection and manner of doing work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... time of Contractor's submission of bid (or acceptance of the job order, if negotiated). (2) When Navy specifications are specified in the job order, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever applicable. (c) The Government may...

  14. 48 CFR 252.217-7005 - Inspection and manner of doing work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... time of Contractor's submission of bid (or acceptance of the job order, if negotiated). (2) When Navy specifications are specified in the job order, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever applicable. (c) The Government may...

  15. 48 CFR 252.217-7005 - Inspection and manner of doing work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... time of Contractor's submission of bid (or acceptance of the job order, if negotiated). (2) When Navy specifications are specified in the job order, the Contractor shall follow Navy standards of material and workmanship. The solicitation shall prescribe the Navy standard whenever applicable. (c) The Government may...

  16. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 915.404-4-71-1 Section 915.404-4-71-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND...) Reward contractors based on the complexity of work; (2) Reward contractors who demonstrate and establish...

  17. 48 CFR 52.227-18 - Rights in Data-Existing Works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or regulations to participate in the defense of the claim or suit, and obtains the Contractor's consent to the...

  18. 48 CFR 52.227-18 - Rights in Data-Existing Works.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or regulations to participate in the defense of the claim or suit, and obtains the Contractor's consent to the...

  19. 48 CFR 52.227-18 - Rights in Data-Existing Works.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or regulations to participate in the defense of the claim or suit, and obtains the Contractor's consent to the...

  20. 48 CFR 52.227-18 - Rights in Data-Existing Works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or regulations to participate in the defense of the claim or suit, and obtains the Contractor's consent to the...

  1. 10 CFR 1706.7 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... decline to approve performance of a particular task by the contractor if an actual or potential OCI is...) Terminate the contract, or, in the case of a task order contract, terminate the particular task; (ii) Insist... contractor to continue to perform the contract (or task) under the waiver provisions of § 1706.8, and, where...

  2. 77 FR 72905 - Pipeline Safety: Random Drug Testing Rate; Contractor MIS Reporting; and Obtaining DAMIS Sign-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and... DAMIS Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... testing information must be submitted for contractors performing or ready to perform covered functions...

  3. 34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false Use of contractors to perform billing and collection or other program activities. 674.48 Section 674.48 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS...

  4. 34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Use of contractors to perform billing and collection or other program activities. 674.48 Section 674.48 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS...

  5. 48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise primary management direction and control over the PI and be overall responsible for the PI's performance under this contract...

  6. 75 FR 8272 - Defense Federal Acquisition Regulation Supplement; Acquisition Strategies To Ensure Competition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Competition Throughout the Life Cycle of Major Defense Acquisition Programs AGENCY: Defense Acquisition... subcontract level of the MDAP throughout its life cycle as a means to improve contractor performance; and (2...) throughout the program life cycle as a means to improve contractor performance; and (ii) Document the...

  7. 48 CFR 52.209-9 - Updates of Publicly Available Information Regarding Responsibility Matters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi... Contractor Registration database at http://www.ccr.gov. (b)(1) The Contractor will receive notification when..., except past performance reviews, will be publicly available. (End of clause) Alternate I ( JAN 2011). As...

  8. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  9. Delicious Heart-Healthy Latino Recipes

    MedlinePlus

    ... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...

  10. Navy Financial Reporting of Government-Owned Materials Held by Commercial Shipyard Contractors

    DTIC Science & Technology

    2001-03-02

    NAVY FINANCIAL REPORTING OF GOVERNMENT-OWNED MATERIALS HELD BY COMMERCIAL SHIPYARD CONTRACTORS Report No. D-2001-071...A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Navy Financial Reporting of Government-Owned Materials Held by Commercial Shipyard... Financial Reporting of Government-Owned Materials Held by Commercial Shipyard Contractors Executive Summary Introduction. We performed this audit in

  11. Implementation of a Mentor-Protege Program by a Major Department of Defense Contractor

    DTIC Science & Technology

    1991-06-01

    Department of Defense contractors to furnish disadvantaged small business concerns with assistance designed to enhance their capabilities to perform...implementation by analyzing the perceptions of one large DoD contractor and the small disadvantaged business community regarding the Mentor-Protege program...offered by this program would be effective in improving the capabilities of small disadvantaged businesses. There are, however, several barriers present

  12. Quality based prequalification of contractors

    DOT National Transportation Integrated Search

    2001-08-01

    This report summarizes the efforts to provide the Kentucky Transportation Cabinet with a system for evaluating the quality of the performance of contractors on highway construction projects and using that evaluation in the Cabinet's annual prequalifi...

  13. 48 CFR 509.405-1 - Continuation of current contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to the debarment or suspension also constitute a default in the contractor's performance of the contract. (2) The contractor presents a significant risk to the Government in completing the contract. (3...

  14. Asthma & Physical Activity in the School

    MedlinePlus

    ... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...

  15. Families Finding the Balance: A Parent Handbook

    MedlinePlus

    ... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor my discriminate against any employee or applicant for ...

  16. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this... technical bias or unfair competitive advantage. (d) Disclosure after award. (1) The contractor warrants that...

  17. Weapon Acquisition Program Outcomes and Efforts to Reform DOD’s Acquisition Process

    DTIC Science & Technology

    2016-05-09

    portfolio’s total estimated acquisition cost. 11. The equity prices of contractors delivering the ten costliest programs performed well relative to broad...cost growth. • In a constrained funding environment, unforeseen cost increases limit investment choices. The equity prices of the contractors ...remain profitable well into the future • Five publicly-traded defense contractors are developing and delivering the ten largest DOD programs in the 2015

  18. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories (Revised)

    DTIC Science & Technology

    2013-02-01

    or funds authorized under Section 219(a) for projects costing no more than $4M. Research , Development, Test , and Evaluation (RDT&E) Appropriations...The RDT&E appropriation consists of the mission program budgets for all research , development, test and evaluation work performed by contractors...carry out an unspecified minor military construction project costing not more than $4,000,000. 9 f. Research , Development, Test , and Evaluation

  19. Measure Guideline. Air Sealing Attics in Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Otis, Casey; Maxwell, Sean

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  20. Measure Guideline: Air Sealing Attics in Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Otis, C.; Maxwell, S.

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  1. Defense Small Business Innovation Research Program (SBIR). Program Solicitation Number 89.1. FY-1989

    DTIC Science & Technology

    1989-01-06

    scale testing, such as plasma-arc and oxyacetylene torch test are performed. However, correlations to relate ablation rate from these test data to...helicopter rotor. In phase II, the contractor should construct and demonstrate a working model. 36 A89-010 TITLE: Smooth, Erosion Resistant Coatings ...for Organic Matrix Composites OBJECTIVE: Erosion Resistant Coatings for Organic Matrix Composites for use in Compressor Section of Future Gas Turbine

  2. Selected DOE Headquarters publications, October 1977-September 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-11-01

    This sixth issue of cumulative listings of DOE Headquarters publications covers the first two years of the Department's operation (October 1, 1977 - September 30, 1979). It lists two groups of publications issued by then-existing Headquarters organizations and provides an index to their title keywords. The two groups of publications are publications assigned a DOE/XXX-type report number code and Headquarters contractor reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department. Certain publications are omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, and telephone directories, as wellmore » as headquarters publications issued under the DOE-tr (DOE translation) and CONF (conference proceedings) codes, and technical reports from the Jet Propulsion Laboratory and NASA issued under DOE/JPL and DOE/NASA codes. The contents of this issue will not be repeated in subsequent issues of DOE/AD-0010. (RWR)« less

  3. 48 CFR 1552.235-80 - Access to confidential business information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) during the performance of tasks required under this contract. However, the following applies to any and all tasks under which the contractor will or may have access to CBI: The contractor shall not have...

  4. Selection of infectious medical waste disposal firms by using the analytic hierarchy process and sensitivity analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsu, P.-F.; Wu, C.-R.; Li, Y.-T.

    2008-07-01

    While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derivedmore » to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.« less

  5. 48 CFR 42.1302 - Suspension of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...

  6. 48 CFR 42.1302 - Suspension of work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...

  7. 48 CFR 42.1302 - Suspension of work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...

  8. 48 CFR 42.1302 - Suspension of work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...

  9. 48 CFR 42.1302 - Suspension of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...

  10. Microcomputer Processing of LANDSAT Thematic Mapper Data for the Acquisition of Military Tactical Terrain Data.

    DTIC Science & Technology

    1985-04-12

    12 9 5 VPV TiTAY T,%. T , TiRAiU A ~ 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(.) 6. CONTRACT OR GRANT NUMBER(a) .-- CPT zi 0 9. PERFORMING ...of period covered, such as the life of a contract covered in a final contractor report. Block 6. Performing Organization Report Number. Only numbers...affiliation of an author if it differs from that of the performing organization. Block 8. Contract or grant Number(s). For a contractor or grantee

  11. Summary Report - Inspections of DoD Facilities and Military Housing and Audits of Base Operations and Support Services Contracts

    DTIC Science & Technology

    2016-10-14

    not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians

  12. DOD Inventory of Contracted Services: Timely Decisions and Further Actions Needed to Address Long Standing Issues

    DTIC Science & Technology

    2016-10-01

    which contractors were providing services that are closely associated with inherently governmental functions, a key review objective to help ensure...or dinapolit@gao.gov. Why GAO Did This Study DOD is the government’s largest purchaser of contractor -provided services. In 2008, Congress...required DOD to compile and review an annual inventory of its contracted services to identify the number of contractors performing services and the

  13. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.502 Applicability. (a) This... limited to any particular kind of acquisition. However, organizational conflicts of interest are more... professional services; (3) Contractor performance of or assistance in technical evaluations; or (4) Systems...

  14. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform...

  15. 48 CFR 215.404-71-3 - Contract type risk and working capital adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Description. The contract type risk factor focuses on the degree of cost risk accepted by the contractor under... extract from the DD 1547 is annotated to explain the process. Item Contractor risk factors Assigned value Base (item 20) Profit objective 24. CONTRACT type risk (1) (2) (3) Cost financed Length factor Interest...

  16. 48 CFR 8.405-1 - Ordering procedures for supplies, and services not requiring a statement of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Orders at or below the micro-purchase threshold. Ordering activities may place orders at, or below, the micro-purchase threshold with any Federal Supply Schedule contractor that can meet the agency's needs... attempt to distribute orders among contractors. (c) Orders exceeding the micro-purchase threshold but not...

  17. 41 CFR 102-72.69 - What additional terms and conditions apply to an Executive agencies' delegation of ancillary...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... alteration work, the Executive agency shall deliver, or cause its contractor to deliver, to the building... liability and property damage insurance policies to cover claims arising from or relating to the contractor... liability, either directly or indirectly, for any contractual claims or disputes that arise out of or relate...

  18. 41 CFR 102-72.69 - What additional terms and conditions apply to an Executive agencies' delegation of ancillary...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... alteration work, the Executive agency shall deliver, or cause its contractor to deliver, to the building... liability and property damage insurance policies to cover claims arising from or relating to the contractor... liability, either directly or indirectly, for any contractual claims or disputes that arise out of or relate...

  19. 41 CFR 102-72.69 - What additional terms and conditions apply to an Executive agencies' delegation of ancillary...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... alteration work, the Executive agency shall deliver, or cause its contractor to deliver, to the building... liability and property damage insurance policies to cover claims arising from or relating to the contractor... liability, either directly or indirectly, for any contractual claims or disputes that arise out of or relate...

  20. 41 CFR 102-72.69 - What additional terms and conditions apply to an Executive agencies' delegation of ancillary...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... alteration work, the Executive agency shall deliver, or cause its contractor to deliver, to the building... liability and property damage insurance policies to cover claims arising from or relating to the contractor... liability, either directly or indirectly, for any contractual claims or disputes that arise out of or relate...

Top