Control console replacement at the WPI Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
Control console replacement at the WPI Reactor. [Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
View of Mission Control Center during the Apollo 13 liftoff
NASA Technical Reports Server (NTRS)
1970-01-01
Sigurd A. Sjoberg, Director of Flight Operations at Manned Spacecraft Center (MSC), views the Apollo 13 liftoff from a console in the MSC Mission Control Center, bldg 30. Apollo 13 lifted off at 1:13 p.m., April 11, 1970 (34627); Astronaut Thomas F. Mattingly II, who was scheduled as a prime crewman for the Apollo 13 mission but was replaced in the final hours when it was discovered he had been exposed to measles, watches the liftoff phase of the mission. He is seated at a console in the Mission Control Center's Mission Operations Control Room. Scientist-Astronaut Joseph P. Kerwin, a spacecraft communicator for the mission, looks on at right (34628).
View of Mission Control Center during the Apollo 13 oxygen cell failure
NASA Technical Reports Server (NTRS)
1970-01-01
Several persons important to the Apollo 13 mission, at consoles in the Mission Operations Control Room of the Mission Control Center (MCC). Seated at consoles, from left to right, are Astronaut Donald K. Slayton, Director of Flight Crew Operations; Astronaut Jack R. Lousma, Shift 3 spacecraft communicator; and Astronaut John W. Young, commander of the Apollo 13 back-up crew. Standing, left to right, are Astronaut Tom K. Mattingly, who was replaced as Apollo 13 command module pilot after it was learned he may come down with measles, and Astronaut Vance D. Brand, Shift 2 spacecraft communicator. Several hours earlier crew members of the Apollo 13 mission reported to MCC that trouble had developed with an oxygen cell in their spacecraft.
View of Mission Control Center during the Apollo 13 oxygen cell failure
1970-04-14
S70-34902 (14 April 1970) --- Several persons important to the Apollo 13 mission, at consoles in the Mission Operations Control Room (MOCR) of the Mission Control Center (MCC). Seated at consoles, from left to right, are astronauts Donald K. Slayton, director of flight crew operations; astronaut Jack R. Lousma, Shift 3 spacecraft communicator; and astronaut John W. Young, commander of the Apollo 13 backup crew. Standing, left to right, are astronaut Tom K. Mattingly II, who was replaced as Apollo 13 command module pilot after it was learned he may come down with measles, and astronaut Vance D. Brand, Shift 2 spacecraft communicator. Several hours earlier, in the late evening hours of April 13, crew members of the Apollo 13 mission reported to MCC that trouble had developed with an oxygen cell on their spacecraft.
A home-built digital optical MRI console using high-speed serial links.
Tang, Weinan; Wang, Weimin; Liu, Wentao; Ma, Yajun; Tang, Xin; Xiao, Liang; Gao, Jia-Hong
2015-08-01
To develop a high performance, cost-effective digital optical console for scalable multichannel MRI. The console system was implemented with flexibility and efficiency based on a modular architecture with distributed pulse sequencers. High-speed serial links were optimally utilized to interconnect the system, providing fast digital communication with a multi-gigabit data rate. The conventional analog radio frequency (RF) chain was replaced with a digital RF manipulation. The acquisition electronics were designed in close proximity to RF coils and preamplifiers, using a digital optical link to transmit the MR signal. A prototype of the console was constructed with a broad frequency range from direct current to 100 MHz. A temporal resolution of 1 μs was achieved for both the RF and gradient operations. The MR signal was digitized in the scanner room with an overall dynamic range between 16 and 24 bits and was transmitted to a master controller over a duplex optic fiber with a high data rate of 3.125 gigabits per second. High-quality phantom and human images were obtained using the prototype on both 0.36T and 1.5T clinical MRI scanners. A homemade digital optical MRI console with high-speed serial interconnection has been developed to better serve imaging research and clinical applications. © 2014 Wiley Periodicals, Inc.
View of Mission Control Center during the Apollo 13 liftoff
1970-04-11
S70-34628 (11 April 1970) --- Astronaut Thomas K. (Ken) Mattingly II, who was scheduled as a prime crew member for the Apollo 13 lunar landing mission but was replaced in the final hours when it was discovered he had been exposed to measles, watches the liftoff phase of the mission. He is seated at a console in the Mission Control Center’s (MCC) Mission Operations Control Room (MOCR). Scientist-astronaut Joseph P. Kerwin, a spacecraft communicator for the mission, looks on at right.
A New Flying Wire System for the Tevatron
NASA Astrophysics Data System (ADS)
Blokland, Willem; Dey, Joseph; Vogel, Greg
1997-05-01
A new Flying Wires system replaces the old system to enhance the analysis of the beam emittance, improve the reliability, and handle the upcoming upgrades of the Tevatron. New VME data acquisition modules and timing modules allow for more bunches to be sampled more precisely. The programming language LabVIEW, running on a Macintosh computer, controls the VME modules and the nuLogic motion board that flies the wires. LabVIEW also analyzes and stores the data, and handles local and remote commands. The new system flies three wires and fits profiles of 72 bunches to a gaussian function within two seconds. A new console application operates the flying wires from any control console. This paper discusses the hardware and software setup, the capabilities and measurement results of the new Flying Wires system.
JSC MCC Bldg 30 Instrumentation and Communications Officer (INCO) RTDS
1988-06-02
Instrumentation and Communications Officer (INCO) John F. Muratore monitors conventional workstation displays during an STS-26 simulation in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). Next to Muratore an operator views the real time data system (RTDS), an expert system. During the STS-29 mission two conventional monochrome console display units will be removed and replaced with RTDS displays. View is for the STS-29 press kit from Office of Aeronautics and Space Technology (OAST) RTDS.
9. PAYLOAD CONTROL CONSOLE NEAR EAST WALL OF SLC3W CONTROL ...
9. PAYLOAD CONTROL CONSOLE NEAR EAST WALL OF SLC-3W CONTROL ROOM. PAYLOAD CONTROLS INSTALLED IN CONSOLE BY THE PAYLOAD SPONSOR PRIOR TO EACH LAUNCH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC3W ...
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING USAF LAUNCH CONTROLLER AND ASSISTANT USAF LAUNCH CONTROLLER PANELS. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
10. PAYLOAD CONTROL CONSOLE NEAR SOUTH WALL OF SLC3W CONTROL ...
10. PAYLOAD CONTROL CONSOLE NEAR SOUTH WALL OF SLC-3W CONTROL ROOM. DECALS ON CONSOLE IN FOREGROUND INDICATE PAYLOAD PROGRAMS LAUNCHED FROM SLC-3W. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
27. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE. COMMUNICATIONS CONSOLE AT LEFT; ...
27. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE. COMMUNICATIONS CONSOLE AT LEFT; LAUNCH CONTROL CONSOLE AT RIGHT. PADLOCKED PANEL AT TOP CENTER CONTAINS MISSILE LAUNCH KEYS. SHOCK ISOLATOR AT FAR LEFT. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
3. Credit BG. The interior of the control room appears ...
3. Credit BG. The interior of the control room appears in this view, looking north (0°). The control console in the room center permitted remote control of various propellant grinders and mixers in surrounding buildings. Television monitors (absent from their mounts in this view) permitted direct viewing of operating machinery. From foreground to background: Panel (1) contains OGAR warning light switches for Curing Buildings E-39, E-40, E-41 and E-86; (O=off, G=green safe, A=amber caution, R=red danger) Panel (2) E-85 Oxidizer Dryer Building console: OGAR switch Panel (3) E-84 Oxidizer Grinder Building console: controls for vibrator, feed, and hammer; Panel (4) E-36 Oxidizer Grinder Building console: controls for vibrator, feed, hammer, attritor, and SWECO ("SWECO" undefined) Panels (5) & (6) blank Panel (7) E-38 Mixer & Casting Building console: vacuum pump, blender, heating and cooling controls Panel (8) E-37 Mixer & Casting Building console: motor controls for 1 pint, 1 gallon, 5 gallon and 30 gallon mixers; vacuum pump, deluge (fire suppression), pot up/down, vibrator, feed, and SWECO. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN ...
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING BLANK PANEL AND COMPLEX SAFETY OFFICER PANEL. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
One Way of Testing a Distributed Processor
NASA Technical Reports Server (NTRS)
Edstrom, R.; Kleckner, D.
1982-01-01
Launch processing for Space Shuttle is checked out, controlled, and monitored with new system. Entire system can be exercised by two computer programs--one in master console and other in each of operations consoles. Control program in each operations console detects change in status and begins task initiation. All of front-end processors are exercised from consoles through common data buffer, and all data are logged to processed-data recorder for posttest analysis.
NASA Technical Reports Server (NTRS)
Parker, J. F., Jr.; Duffy, J. W.; Christensen, D. G.
1981-01-01
A Flight Data Console simulation of a digital communication link to replace the current voice communication system used in air traffic control (ATC) was developed. The study determined how a digital communications system reduces cockpit workload, improve, flight proficiency, and is acceptable to general aviation pilots. It is shown that instrument flight, including approach and landing, can be accomplished by using a digital data link system for ATC communication.
Prototype Equipment Student Guide for ACE (Air Intercept Controller Prototype Training System).
1981-09-01
as your " home base", directing you to where you should be (at the Student Station CRT or the Console) and stating what you could (or should) do once...review the transmissions made in your last Practice with- out Freezes (see Subsection IV A) a take a break * re-start the instruction * answer a...the instructor select the phrase from the menu. The new collections will replace the previous collections made for the phrase. instructor Two keys on
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.
25. VIEW OF ATLAS CONTROL CONSOLE NEAR NORTHEAST CORNER OF ...
25. VIEW OF ATLAS CONTROL CONSOLE NEAR NORTHEAST CORNER OF SLC-3W CONTROL ROOM. CONSOLE INCLUDES TELEVISION CONTROL, FACILITIES, AND VEHICLE (MISSILE) POWER PANELS. FROM LEFT TO RIGHT IN BACKGROUND: MILITARY-TIME CLOCK, BASE OF BUNKER PERISCOPE, AND STAIRS TO ESCAPE TUNNEL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
View from the back of the Flight control room of Mission control center
1984-10-06
View from the back of the Mission Control Center (MCC). Visible are the Flight Directors console (left front), the CAPCOM console (right front) and the Payloads console. Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-27
... United States (HTS). The goods involved include certain sensitized photographic film, video game console... chapter 37, and (2) Providing specifically for cordless video game console controllers which use infrared... ``; cordless video game console controllers which use infrared transmissions to operate or access the various...
Fisheye view from the back of the Flight control room of the MCC
1984-10-06
Fisheye view from the back of the Flight Control Room (FCR) of the Mission Control Center (MCC). Visible are the Flight Directors console (left front), the CAPCOM console (right front) and the Payloads console. Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.
77. Deputy commander's launch control console, fire control panel missing ...
77. Deputy commander's launch control console, fire control panel missing at right, south side - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...
12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBS FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL
13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...
13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBC FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
Close up view of the center console on the flight ...
Close up view of the center console on the flight deck of the Orbiter Discovery showing the console's instrumentation and controls. The commanders station is located to the left in this view and the pilot's station is to the right in the view. The handle and lever located on the right side of the center console and towards its front is one of a pair, the commander has one on the left of his seat in his station, of Speed Brake/Thrust Controllers. These are dual purpose controllers. During ascent the controller can be use to throttle the main engines and during entry the controllers can be used to control aerodynamic drag by opening or closing the orbiter's speed brake. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Circuit for connecting the Videoton-340 with the ES-1030 as an operator console
NASA Technical Reports Server (NTRS)
Uskov, V. A.; PRYADIN
1979-01-01
A system of connection of the Videoton-340 text display to the standard ES-7070 unit, for use as an operator console, partially replacing and supplementing the ES-7070 electric typewriter, is described. The interactions, including the specific instructions, among the Videoton-340, the Consul-260.1 electric typewriter and the ES-7070, which is the means of user access to the unified system of computers, are presented. Users at the Institute of Space Research note the reliability, high information output rate, noiselessness and convenience of the keyboard of the system.
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
69. Commander's launch control console, east end, plexiglass shield up ...
69. Commander's launch control console, east end, plexiglass shield up - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
Expedition 13 flight controller on console during mission - Orbit 1, BFCR
2006-08-31
JSC2006-E-38928 (31 Aug. 2006) --- Flight director Rick LaBrode monitors data at his console in the Station (Blue) Flight Control Room in Houston's Mission Control Center during Expedition 13 mission activities.
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
70. Commander's launch control console, plexiglass shield down, looking southeast, ...
70. Commander's launch control console, plexiglass shield down, looking southeast, filing cabinet in corner - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
Astronaut Owen Garriott at the Apollo Telescope Mount console
1973-08-08
Scientist-Astronaut Owen K. Garriott, science pilot of the Skylab 3 mission, is stationed at the Apollo Telescope Mount (ATM) console in the Multiple Docking Adapter of the Skylab space station in Earth orbit. From this console the astronauts actively control the ATM solar physics telescope.
IET control building (TAN620). control room. facing north. control consoles ...
IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
STS-134 Orbit 2 flight controllers on consoles
2011-05-17
JSC2011-E-045475 (17 May 2011) --- Flight director Paul Dye monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-134 flight day two activities. Photo credit: NASA
STS-132/ULF4 Flight Controllers on Console - Orbit 2
2010-05-17
JSC2010-E-084363 (17 May 2010) --- Flight director Chris Edelen monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132 flight day four activities.
18. DETAIL OF NORTH END OF ATLAS CONTROL CONSOLE NEAR ...
18. DETAIL OF NORTH END OF ATLAS CONTROL CONSOLE NEAR WEST WALL OF SLC-3W CONTROL ROOM SHOWING PAYLOAD ENVIRONMENT CONTROL AND MONITORING PANELS (LABELED 'PECMP') - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
26. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW ...
26. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW MEMBER LIEUTENANT KEVIN R. MCCLUNEY AT COMMUNICATIONS CONSOLE. LAUNCH CONTROL CONSOLE IN FOREGROUND. VIEW TO NORTH. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
16. DETAIL OF SOUTH END OF ATLAS CONTROL CONSOLE NEAR ...
16. DETAIL OF SOUTH END OF ATLAS CONTROL CONSOLE NEAR WEST WALL OF SLC-3W CONTROL ROOM SHOWING CONTROLS FOR STILL CAMERAS POSITIONED AROUND THE LAUNCH PAD - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
STS-132/ULF4 Flight Controllers on Console
2010-05-18
JSC2010-E-081929 (18 May 2010) --- Kyle Herring, Public Affairs Office (PAO) commentator, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132 mission flight day five activities.
STS-132/ULF4 Flight Controllers on Console
2010-05-18
JSC2010-E-081946 (18 May 2010) --- ISS flight director Emily Nelson monitors data at her console in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132/ULF-4 mission flight day five activities.
STS-132/ULF4 Flight Controllers on Console - Bldg. 30 south
2010-05-20
JSC2010-E-086375 (20 May 2010) --- Flight director Mike Sarafin monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132 mission flight day seven activities.
STS-132/ULF4 Flight Controllers on Console - Bldg. 30 south
2010-05-20
JSC2010-E-086399 (20 May 2010) --- Flight director Mike Sarafin monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132 mission flight day seven activities.
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE ...
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
STS-132/ULF4 Flight Controllers on Console
2010-05-18
JSC2010-E-081914 (18 May 2010) --- ISS flight director Holly Ridings reviews data at her console in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132/ULF-4 mission flight day five activities.
Development of a remote control console for the HHIRF 25-MV tandem accelerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasanul Basher, A.M.
1991-09-01
The CAMAC-based control system for the 25-MV Tandem Accelerator at HHIRF uses two Perkin-Elmer, 32-bit minicomputers: a message-switching computer and a supervisory computer. Two operator consoles are located on one of the six serial highways. Operator control is provided by means of a console CRT, trackball, assignable shaft encoders and meters. The message-switching computer transmits and receives control information on the serial highways. At present, the CRT pages with updated parameters can be displayed and parameters can be controlled only from the two existing consoles, one in the Tandem control room and the other in the ORIC control room. Itmore » has become necessary to expand the control capability to several other locations in the building. With the expansion of control and monitoring capability of accelerator parameters to other locations, the operators will be able to control and observe the result of the control action at the same time. Since the new control console will be PC-based, the existing page format will be changed. The PC will be communicating with the Perkin-Elmer through RS-232 and a communication software package. Hardware configuration has been established, a communication software program that reads the pages from the shared memory has been developed. In this paper, we present the implementation strategy, works completed, existing and new page format, future action plans, explanation of pages and use of related global variables, a sample session, and flowcharts.« less
A remote control console for the HHIRF 25-MV Tandem Accelerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasanul Basher, A.M.
The CAMAC-based control system for the 25-MV Tandem Accelerator at HHIRF uses two Perkin-Elmer, 32-bit minicomputers: a message-switching computer and a supervisory computer. Two operator consoles are located on one of the six serial highways. Operator control is provided by means of a console CRT, trackball, assignable shaft encoders, and meters. The message-switching computer transmits and receives control information on the serial highways. At present, the CRT pages with updated parameters can be displayed and parameters can be controlled only from the two existing consoles, one in the Tandem control room and the other in the ORIC control room. Itmore » has become necessary to expand the control capability to several other locations in the building. With the expansion of control and monitoring capability of accelerator parameters to other locations, the operators will be able to control and observe the result of the control action at the same time. This capability will be useful in the new Radioactive Ion Beam project of the division. Since the new control console will be PC-based, the existing page format will be changed. The PC will be communicating with the Perkin-Elmer through RS-232 with the aid of a communication protocol. Hardware configuration has been established, a software program that reads the pages from the shared memory, and a communication protocol have been developed. The following sections present the implementation strategy, work completed, future action plans, and the functional details of the communication protocol.« less
Expedition 13 flight controller on console during mission - Orbit 1, BFCR
2006-08-31
JSC2006-E-38929 (31 Aug. 2006) --- Astronaut Andrew J. Feustel (background), spacecraft communicator (CAPCOM), and flight director Rick LaBrode monitor data at their consoles in the Station (Blue) Flight Control Room in Houston's Mission Control Center during Expedition 13 mission activities.
STS-125 Flight Controllers on Console - (Orbit Shift 1). Flight Director: Anthony Ceccacci
2009-05-14
JSC2009-E-120480 (14 May 2009) --- Tomas Gonzalez-Torres, STS-125 lead spacewalk officer, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
STS-125 Flight Controllers on Console - (Orbit Shift 1). Flight Director: Anthony Ceccacci
2009-05-14
JSC2009-E-120486 (14 May 2009) --- Tomas Gonzalez-Torres, STS-125 lead spacewalk officer, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
STS-132/ULF4 Flight Controllers on Console - Bldg. 30 south
2010-05-20
JSC2010-E-086341 (20 May 2010) --- ISS flight director Holly Ridings monitors data at her console in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132/ULF-4 mission flight day seven activities.
STS-134 Orbit 2 flight controllers on consoles
2011-05-17
JSC2011-E-045468 (17 May 2011) --- Public Affairs Office (PAO) mission commentator Brandi Dean monitors data at her console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-134 flight day two activities. Photo credit: NASA
STS-125 Flight Controllers on Console - (Orbit Shift 2). Flight Director: Richard LaBrode
2009-05-12
JSC2009-E-119390 (12 May 2009) --- Flight director Rick LaBrode monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-125 flight day two activities.
STS-125 Flight Controllers on Console - (Orbit Shift 1). Flight Director: Anthony Ceccacci
2009-05-14
JSC2009-E-120489 (14 May 2009) --- Astronaut Dan Burbank, STS-125 spacecraft communicator (CAPCOM), monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
STS-134 Orbit 3 Flight Controllers on Console
2011-05-19
JSC2011-E-046428 (19 May 2011) --- NASA astronaut Shannon Lucid, STS-134 spacecraft communicator (CAPCOM), is pictured at her console in the space shuttle flight control room in the Mission Control Center at NASA?s Johnson Space Center during flight day four activities. Photo credit: NASA
STS-134 Orbit 2 flight controllers on consoles
2011-05-17
JSC2011-E-045467 (17 May 2011) --- Public Affairs Office (PAO) mission commentator Brandi Dean is pictured at her console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-134 flight day two activities. Photo credit: NASA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Memmi, F.; Falconi, L.; Cappelli, M.
2012-07-01
Improvements in the awareness of a system status is an essential requirement to achieve safety in every kind of plant. In particular, in the case of Nuclear Power Plants (NPPs), a progress is crucial to enhance the Human Machine Interface (HMI) in order to optimize monitoring and analyzing processes of NPP operational states. Firstly, as old-fashioned plants are concerned, an upgrading of the whole console instrumentation is desirable in order to replace an analog visualization with a full-digital system. In this work, we present a novel instrument able to interface the control console of a nuclear reactor, developed by usingmore » CompactRio, a National Instruments embedded architecture and its dedicated programming language. This real-time industrial controller composed by a real-time processor and FPGA modules has been programmed to visualize the parameters coming from the reactor, and to storage and reproduce significant conditions anytime. This choice has been made on the basis of the FPGA properties: high reliability, determinism, true parallelism and re-configurability, achieved by a simple programming method, based on LabVIEW real-time environment. The system architecture exploits the FPGA capabilities of implementing custom timing and triggering, hardware-based analysis and co-processing, and highest performance control algorithms. Data stored during the supervisory phase can be reproduced by loading data from a measurement file, re-enacting worthwhile operations or conditions. The system has been thought to be used in three different modes, namely Log File Mode, Supervisory Mode and Simulation Mode. The proposed system can be considered as a first step to develop a more complete Decision Support System (DSS): indeed this work is part of a wider project that includes the elaboration of intelligent agents and meta-theory approaches. A synoptic has been created to monitor every kind of action on the plant through an intuitive sight. Furthermore, another important aim of this work is the possibility to have a front panel available on a web interface: CompactRio acts as a remote server and it is accessible on a dedicated LAN. This supervisory system has been tested and validated on the basis of the real control console for the 1-MW TRIGA reactor RC-1 at the ENEA, Casaccia Research Center. In this paper we show some results obtained by recording each variable as the reactor reaches its maximum level of power. The choice of a research reactor for testing the developed system relies on its training and didactic importance for the education of plant operators: in this context a digital instrument can offer a better user-friendly tool for learning and training. It is worthwhile to remark that such a system does not interfere with the console instrumentation, the latter continuing to preserve the total control. (authors)« less
MTR BASEMENT. GENERAL ELECTRIC CONTROL CONSOLE FOR AIRCRAFT NUCLEAR PROPULSION ...
MTR BASEMENT. GENERAL ELECTRIC CONTROL CONSOLE FOR AIRCRAFT NUCLEAR PROPULSION EXPERIMENT NO. 1. INL NEGATIVE NO. 6510. Unknown Photographer, 9/29/1959 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE ...
12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE FOR ENGINE TEST CELL 4. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
PBF Control Building (PER619). Interior of control room. Control console ...
PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Power console development for NASA's electric propulsion outreach program
NASA Technical Reports Server (NTRS)
Pinero, Luis R.; Patterson, Michael J.; Satterwhite, Vincent E.
1993-01-01
NASA LeRC is developing a 30 cm diameter xenon ion thruster for auxiliary and primary propulsion applications. To maximize expectations for user-acceptance of ion propulsion technology, NASA LeRC, through their Electric Propulsion Outreach Program, is providing sectors of industry with portable power consoles for operation of 5 KW-class xenon ion thrusters. This power console provides all necessary functions to permit thruster operations over a 0.5-5 KW envelope under both manual and automated control. These functions include the following: discharge, cathode heater, neutralizer keeper, and neutralizer heater currents, screen and accelerator voltages, and a gas feed system to regulate and control propellant flow to the thruster. An electronic circuit monitors screen and accelerator currents and controls arcing events. The power console was successfully integrated with the NASA 30 cm thruster.
STS-125 Flight Controllers on Console - (Orbit Shift 2). Flight Director: Richard LaBrode
2009-05-12
JSC2009-E-119378 (12 May 2009) --- Tomas Gonzalez-Torres, STS-125 lead spacewalk officer, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day two activities.
STS-134 Orbit 1 flight controllers on console during AMS install
2011-05-19
JSC2011-E-046802 (19 May 2011) --- NASA astronaut Megan McArthur, STS-134 spacecraft communicator (CAPCOM), monitors data at her console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities. Photo credit: NASA
STS-132/ULF4 Flight Controllers on Console
2010-05-18
JSC2010-E-081916 (18 May 2010) --- ISS flight directors Holly Ridings (seated) and Emily Nelson monitor data at their console in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-132/ULF-4 mission flight day five activities.
STS-125 Flight Controllers on Console - (Orbit Shift 2). Flight Director: Richard LaBrode
2009-05-12
JSC2009-E-119397 (12 May 2009) --- Flight directors Rick LaBrode (left) and Chris Edelen monitor data at their console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-125 flight day two activities.
STS-125 Flight Controllers on Console During HST Grapple - Orbit 1. Flight Director: Tony Ceccacci
2009-05-13
JSC2009-E-119633 (13 May 2009) --- Astronaut Dan Burbank, STS-125 spacecraft communicator (CAPCOM), monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day three activities.
STS-125 Flight Controllers on Console - (Orbit Shift 2). Flight Director: Richard LaBrode
2009-05-12
JSC2009-E-119391 (12 May 2009) --- Astronaut Alan Poindexter, STS-125 spacecraft communicator (CAPCOM), monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day two activities.
STS-132/ULF4 Flight Controllers on Console - Orbit 2
2010-05-17
JSC2010-E-084362 (17 May 2010) --- NASA astronaut Stanley Love, spacecraft communicator (CAPCOM) for the STS-132 mission, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
STS-132/ULF4 Flight Controllers on Console - Orbit 2
2010-05-17
JSC2010-E-084364 (17 May 2010) --- NASA astronaut Stanley Love, spacecraft communicator (CAPCOM) for the STS-132 mission, monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
Clifford Charlesworth seated at his console in Mission Control Room
1968-12-21
S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.
Total Hip Joint Replacement Biotelemetry System
NASA Technical Reports Server (NTRS)
Boreham, J. F.; Postal, R. B.; Luntz, R. A.
1981-01-01
The development of a biotelemetry system that is hermetically sealed within a total hip replacement implant is reported. The telemetry system transmits six channels of stress data to reconstruct the major forces acting on the neck of the prosthesis and uses an induction power coupling technique to eliminate the need for internal batteries. The activities associated with the telemetry microminiaturization, data recovery console, hardware fabrications, power induction systems, electrical and mechanical testing and hermetic sealing test results are discussed.
STS-29 Flight Directors Briscoe and Dittemore at JSC MCC consoles
1989-03-18
STS029-S-042 (13 March 1989) --- Flight Directors Ronald D. Dittemore, left and Lee Briscoe monitor solid rocket booster separation activity on monitors at their consoles in the flight control room of the Johnson Space Center's mission control center.
STS-125 Flight Controllers on Console - (Orbit Shift 2). Flight Director: Richard LaBrode
2009-05-12
JSC2009-E-119382 (12 May 2009) --- Flight director Rick LaBrode monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during STS-125 flight day two activities. Flight director Chris Edelen is at right.
STS-125 Flight Controllers on Console During HST Grapple - Orbit 1. Flight Director: Tony Ceccacci
2009-05-13
JSC2009-E-119632 (13 May 2009) --- Flight director Tony Ceccacci and astronaut Dan Burbank (background), STS-125 spacecraft communicator (CAPCOM), monitor data at their consoles in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day three activities.
STS-132/ULF4 Flight Controllers on Console
2010-05-18
JSC2010-E-081909 (18 May 2010) --- Flight director Mike Sarafin (left) and NASA astronaut Chris Cassidy, spacecraft communicator (CAPCOM) for the STS-132 mission, are pictured at their consoles in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day five activities.
STS-132/ULF4 Flight Controllers on Console - Orbit 2
2010-05-17
JSC2010-E-084271 (17 May 2010) --- Flight director Chris Edelen (right) and NASA astronaut Stanley Love, spacecraft communicator (CAPCOM) for the STS-132 mission, are pictured at their consoles in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day four activities.
30. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE. OPERATORS' CHAIR AND COMMUNICATIONS ...
30. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE. OPERATORS' CHAIR AND COMMUNICATIONS CONSOLE IN FOREGROUND. ELECTRONIC EQUIPMENT RACK AT LEFT; LAUNCH CONTROL CONSOLE WITH CAPTAIN JAMES L. KING, JR. IN CENTER. LIEUTENANT KEVIN R. MCCLUNEY IN BACKGROUND. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
Documentary views of Flight Director and Controller activity during STS-2
NASA Technical Reports Server (NTRS)
1981-01-01
Eugene F. Kranz, left, and Dr. Christopher C. Kraft, Jr., Deputy Director of the Flight Operations Directorate (FOD), monitor data displayed on the FOD console in the Mission Operations Control Room (MOCR) following the launch of Columbia STS-2 mission (39431); wide view of overall activity in the MOCR on Nov. 12, 1981. The two consoles in the foreground are EGIL (Electric Power Instrumentation and Light Systems Engineer) and EECOM (Environmental Consumable and Mechanical Systems Engineer) (39432); Flight Director Neil B. Hutchinson monitors data displayed on a cathode ray tube (CRT) at his console in the the MOCR (39433); Astronauts Daniel C. Brandenstein, seated left, and Terry J. Hart, seated right, are both at the spacecraft communicators console (CAPCOM). Behind them is Astronaut Robert L. Crippen, pilot for STS-1 (39434).
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
Requirements for VICTORIA Class Fire Control System: Contact Management Function
2014-07-01
Canadian Navy ( RCN ) is currently upgrading the fire control system, which will include moving the software to new modular consoles which have screens...Development RCN Royal Canadian Navy SAC Sensor Analysis Coordinator; also called Command Display Console (CDC) operator SAR Search and Rescue SME
Flight Director Portrait - Bryan Austin with Lead EVA Console OPS- for Texas A&M Alumni Magazine
2002-02-27
JSC2002-00546 (February 2002) --- Bryan P. Austin, lead flight director for STS-109, and Dana Weigel, lead EVA officer, pose near their respective consoles in the Shuttle Flight Control Room of the Johnson Space Center's Mission Control Center.
CONSOLE: A CAD tandem for optimization-based design interacting with user-supplied simulators
NASA Technical Reports Server (NTRS)
Fan, Michael K. H.; Wang, Li-Sheng; Koninckx, Jan; Tits, Andre L.
1989-01-01
CONSOLE employs a recently developed design methodology (International Journal of Control 43:1693-1721) which provides the designer with a congenial environment to express his problem as a multiple ojective constrained optimization problem and allows him to refine his characterization of optimality when a suboptimal design is approached. To this end, in CONSOLE, the designed formulates the design problem using a high-level language and performs design task and explores tradeoff through a few short and clearly defined commands. The range of problems that can be solved efficiently using a CAD tools depends very much on the ability of this tool to be interfaced with user-supplied simulators. For instance, when designing a control system one makes use of the characteristics of the plant, and therefore, a model of the plant under study has to be made available to the CAD tool. CONSOLE allows for an easy interfacing of almost any simulator the user has available. To date CONSOLE has already been used successfully in many applications, including the design of controllers for a flexible arm and for a robotic manipulator and the solution of a parameter selection problem for a neural network.
Prevalence of behavior changing strategies in fitness video games: theory-based content analysis.
Lyons, Elizabeth Jane; Hatkevich, Claire
2013-05-07
Fitness video games are popular, but little is known about their content. Because many contain interactive tools that mimic behavioral strategies from weight loss intervention programs, it is possible that differences in content could affect player physical activity and/or weight outcomes. There is a need for a better understanding of what behavioral strategies are currently available in fitness games and how they are implemented. The purpose of this study was to investigate the prevalence of evidence-based behavioral strategies across fitness video games available for home use. Games available for consoles that used camera-based controllers were also contrasted with games available for a console that used handheld motion controllers. Fitness games (N=18) available for three home consoles were systematically identified and play-tested by 2 trained coders for at least 3 hours each. In cases of multiple games from one series, only the most recently released game was included. The Sony PlayStation 3 and Microsoft Xbox360 were the two camera-based consoles, and the Nintendo Wii was the handheld motion controller console. A coding list based on a taxonomy of behavioral strategies was used to begin coding. Codes were refined in an iterative process based on data found during play-testing. The most prevalent behavioral strategies were modeling (17/18), specific performance feedback (17/18), reinforcement (16/18), caloric expenditure feedback (15/18), and guided practice (15/18). All games included some kind of feedback on performance accuracy, exercise frequency, and/or fitness progress. Action planning (scheduling future workouts) was the least prevalent of the included strategies (4/18). Twelve games included some kind of social integration, with nine of them providing options for real-time multiplayer sessions. Only two games did not feature any kind of reward. Games for the camera-based consoles (mean 12.89, SD 2.71) included a greater number of strategies than those for the handheld motion controller console (mean 10.00, SD 2.74, P=.04). Behavioral strategies for increasing self-efficacy and self-regulation are common in home console fitness video games. Social support and reinforcement occurred in approximately half of the studied games. Strategy prevalence varies by console type, partially due to greater feedback afforded by camera-based controllers. Experimental studies are required to test the effects of these strategies when delivered as interactive tools, as this medium may represent an innovative platform for disseminating evidence-based behavioral weight loss intervention components.
Prevalence of Behavior Changing Strategies in Fitness Video Games: Theory-Based Content Analysis
Hatkevich, Claire
2013-01-01
Background Fitness video games are popular, but little is known about their content. Because many contain interactive tools that mimic behavioral strategies from weight loss intervention programs, it is possible that differences in content could affect player physical activity and/or weight outcomes. There is a need for a better understanding of what behavioral strategies are currently available in fitness games and how they are implemented. Objective The purpose of this study was to investigate the prevalence of evidence-based behavioral strategies across fitness video games available for home use. Games available for consoles that used camera-based controllers were also contrasted with games available for a console that used handheld motion controllers. Methods Fitness games (N=18) available for three home consoles were systematically identified and play-tested by 2 trained coders for at least 3 hours each. In cases of multiple games from one series, only the most recently released game was included. The Sony PlayStation 3 and Microsoft Xbox360 were the two camera-based consoles, and the Nintendo Wii was the handheld motion controller console. A coding list based on a taxonomy of behavioral strategies was used to begin coding. Codes were refined in an iterative process based on data found during play-testing. Results The most prevalent behavioral strategies were modeling (17/18), specific performance feedback (17/18), reinforcement (16/18), caloric expenditure feedback (15/18), and guided practice (15/18). All games included some kind of feedback on performance accuracy, exercise frequency, and/or fitness progress. Action planning (scheduling future workouts) was the least prevalent of the included strategies (4/18). Twelve games included some kind of social integration, with nine of them providing options for real-time multiplayer sessions. Only two games did not feature any kind of reward. Games for the camera-based consoles (mean 12.89, SD 2.71) included a greater number of strategies than those for the handheld motion controller console (mean 10.00, SD 2.74, P=.04). Conclusions Behavioral strategies for increasing self-efficacy and self-regulation are common in home console fitness video games. Social support and reinforcement occurred in approximately half of the studied games. Strategy prevalence varies by console type, partially due to greater feedback afforded by camera-based controllers. Experimental studies are required to test the effects of these strategies when delivered as interactive tools, as this medium may represent an innovative platform for disseminating evidence-based behavioral weight loss intervention components. PMID:23651701
STS-29 Flight Directors Briscoe and Dittemore at JSC MCC consoles
1989-03-18
STS029-S-041 (13 March 1989) --- Flight Directors (FD) Lee Brisco (left) and Ronad D. Dittmore monitor prelaunch activity on monitors at their consoles in the flight control room of the Johnson Space Center's mission control center. FD Gary Coen is in the back ground.
Computation of leading edge film cooling from a CONSOLE geometry (CONverging Slot hOLE)
NASA Astrophysics Data System (ADS)
Guelailia, A.; Khorsi, A.; Hamidou, M. K.
2016-01-01
The aim of this study is to investigate the effect of mass flow rate on film cooling effectiveness and heat transfer over a gas turbine rotor blade with three staggered rows of shower-head holes which are inclined at 30° to the spanwise direction, and are normal to the streamwise direction on the blade. To improve film cooling effectiveness, the standard cylindrical holes, located on the leading edge region, are replaced with the converging slot holes (console). The ANSYS CFX has been used for this computational simulation. The turbulence is approximated by a k-ɛ model. Detailed film effectiveness distributions are presented for different mass flow rate. The numerical results are compared with experimental data.
20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC3W CONTROL ...
20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC-3W CONTROL ROOM. PANELS FROM LEFT TO RIGHT: OPERATIONS AND CHECKOUT (LABELED POWER CONTROL AND MONITOR PANEL); RANGE SAFETY (LABELED DESTRUCT SYSTEM CONTROL AND MONITOR PANEL); BATTERY CLOCK PANELS. PEDAL FOR FOOT CONTROL OF COMMUNICATIONS HEADSET AND HEADSET IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
American ASTP crewmen briefed on operation of consoles in main control room
1975-04-25
S75-25619 (25 April 1975) --- A group of American ASTP crewmen is briefed on the operation of the consoles in the main control room at the ASTP flight control center at the Cosmonaut Training Center (Star City) near Moscow. The astronauts were in the Soviet Union for ASTP joint crew training with the Soviet ASTP crewmen. PHOTO COURTESY: USSR ACADEMY OF SCIENCES
Overhead tray for cable test system
NASA Technical Reports Server (NTRS)
Saltz, K. T.
1976-01-01
System consists of overhead slotted tray, series of compatible adapter cables, and automatic test set which consists of control console and cable-switching console. System reduces hookup time and also reduces cost of fabricating and storing test cables.
25. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW ...
25. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW MEMBERS (FRONT TO BACK) CAPTAIN JAMES L. KING, JR. AT LAUNCH CONTROL CONSOLE AND LIEUTENANT KEVIN R. MCCLUNEY AT COMMUNICATIONS CONSOLE. RADIO TRANSMITTER AND RECEIVER RACKS AT FAR RIGHT; ELECTRONIC EQUIPMENT RACKS AT FAR LEFT. VIEW TO NORTH. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
MTR, TRA603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, USHAPED CONSOLE, ...
MTR, TRA-603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, U-SHAPED CONSOLE, INSTRUMENT PANELS, GLASS DOOR, ASPHALT TILE FLOOR AND COLORS. BLAW-KNOX 3150-803-11, 10/1950. INL INDEX NO. 531-0603-00-098-100570, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
NASA Technical Reports Server (NTRS)
Lane, J. H.
1976-01-01
Performance tests completed on the Space Shuttle Carrier Aircraft (SCA) transceiver console, verifying its design objectives, were described. These tests included: (1) check of power supply voltages for correct output voltage and energization at the proper point in the turn on sequence, (2) check of cooling system (LRU blower, overload sensors and circuitry, and thermocouple probe), (3) check of control circuits logic, including the provisions for remote control and display, (4) check of the LRU connector for presence of correct voltages and absence of incorrect voltages under both energized and deenergized conditions, and (5) check of the AGC and power output monitor circuits.
Consolation as possible expression of sympathetic concern among chimpanzees
Romero, Teresa; Castellanos, Miguel A.; de Waal, Frans B. M.
2010-01-01
Chimpanzees are known to spontaneously provide contact comfort to recent victims of aggression, a behavior known as consolation. Similar behavior in human children is attributed to empathic or sympathetic concern. In line with this empathy hypothesis, chimpanzee consolation has been shown to reduce the recipient's state of arousal, hence to likely alleviate distress. Other predictions from the empathy hypothesis have rarely been tested, however, owing to small sample sizes in previous studies. An exceptionally large database of spontaneous consolation in two outdoor-housed groups of chimpanzees lends further support to the empathy hypothesis in that consolation occurred disproportionally between individuals that are socially close (i.e., kin and affiliation partners) and was more typical of females than males, which differences are also known of human empathy. These effects were demonstrated using generalized linear mixed models, which control multiple variables at once. An exception to the above pattern was formed by the highest-ranking males, which frequently offered consolation to victims of aggression, probably as part of their general policing function in chimpanzee society. Consolation occurred more frequently in the absence of reconciliation between former opponents, suggesting that actors are sensitive to the contact need of victims of aggression, which may be greater if the aggressor ignores them. That consolation is an integrated part of close mutual relationships is supported by the tendency for it being reciprocated. PMID:20547864
Bonobos respond to distress in others: consolation across the age spectrum.
Clay, Zanna; de Waal, Frans B M
2013-01-01
How animals respond to conflict provides key insights into the evolution of socio-cognitive and emotional capacities. Evidence from apes has shown that, after social conflicts, bystanders approach victims of aggression to offer stress-alleviating contact behavior, a phenomenon known as consolation. This other-orientated behavior depends on sensitivity to the other's emotional state, whereby the consoler acts to ameliorate the other's situation. We examined post-conflict interactions in bonobos (Pan paniscus) to identify the determinants of consolation and reconciliation. Thirty-six semi-free bonobos of all ages were observed at the Lola ya Bonobo Sanctuary, DR Congo, using standardized Post-conflict/Matched Control methods. Across age and sex classes, bonobos consoled victims and reconciled after conflicts using a suite of affiliative and socio-sexual behaviors including embracing, touching, and mounting. Juveniles were more likely to console than adults, challenging the assumption that comfort-giving rests on advanced cognitive mechanisms that emerge only with age. Mother-reared individuals were more likely to console than orphans, highlighting the role of rearing in emotional development. Consistent with previous studies, bystanders were more likely to console relatives or closely bonded partners. Effects of kinship, affiliation and rearing were similarly indicated in patterns of reconciliation. Nearby bystanders were significantly more likely to contact victims than more distal ones, and consolation was more likely in non-food contexts than during feeding. The results did not provide convincing evidence that bystander contacts served for self-protection or as substitutes for reconciliation. Overall, results indicate that a suite of social, developmental and contextual factors underlie consolation and reconciliation in bonobos and that a sensitivity to the emotions of others and the ability to provide appropriate consolatory behaviors emerges early in development.
36. ENGINE ROOM FROM STARBOARD SIDE OF CONTROL CONSOLE, LOOKING ...
36. ENGINE ROOM FROM STARBOARD SIDE OF CONTROL CONSOLE, LOOKING AT TWO DIESEL ENGINES, STAIRS LEAD UP TO CREW'S BERTHING. THIS IMAGE IS CLOSER TO THE STERN AND MORE ANGLED TOWARDS THE PORT THAN IMAGE 34. - U.S. Coast Guard Cutter WHITE LUPINE, U.S. Coast Guard Station Rockland, east end of Tillson Avenue, Rockland, Knox County, ME
13. VIEW OF CONTROL CONSOLE CURRENTLY USED ON OCCASION FOR ...
13. VIEW OF CONTROL CONSOLE CURRENTLY USED ON OCCASION FOR AMATUER RADIO AND TO PERIODICALLY ACTIVE STATION KPS. NOTE CLOCK ON WALL. SHADED PORTIONS ON 24HR CLOCK (15-18 AND 45-48 MINUTES) INDICATED MINUTES EACH HOUR WHEN STATIONS WOULD NOT TRANSMIT AND LISTEN FOR WEAK DISTRESS SIGNALS. - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
Master Console Operator Jennifer Tschanz, left, and Master Console Operator Diego Diaz, both of Jacobs, monitor operations from their consoles in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
Motion sickness, console video games, and head-mounted displays.
Merhi, Omar; Faugloire, Elise; Flanagan, Moira; Stoffregen, Thomas A
2007-10-01
We evaluated the nauseogenic properties of commercial console video games (i.e., games that are sold to the public) when presented through a head-mounted display. Anecdotal reports suggest that motion sickness may occur among players of contemporary commercial console video games. Participants played standard console video games using an Xbox game system. We varied the participants' posture (standing vs. sitting) and the game (two Xbox games). Participants played for up to 50 min and were asked to discontinue if they experienced any symptoms of motion sickness. Sickness occurred in all conditions, but it was more common during standing. During seated play there were significant differences in head motion between sick and well participants before the onset of motion sickness. The results indicate that commercial console video game systems can induce motion sickness when presented via a head-mounted display and support the hypothesis that motion sickness is preceded by instability in the control of seated posture. Potential applications of this research include changes in the design of console video games and recommendations for how such systems should be used.
NASA Technical Reports Server (NTRS)
Paga Marrero, Hector Jose
2013-01-01
The Master Console oversees the function of Computer Systems in Firing room 1 (FR1). Master Console Operators, MCOs' for short, are our customer. I was integrated into the System Monitoring and Control (SMC) software team that is under the guidance of David Slaiman, who is the product group lead. I have been brought up to speed with System Monitoring and Control. The initial time spent reading SMC software design description and understanding how it works. The current Firing Room 1 Console Display is a floor layout giving the MCO two essential pieces of information which are Health and Status. When an issue arises, the MCO has to look on the display to find which console is affected and then the MCO must use the Reference designator from the display to manually search for the Portal Workstation (PWS) installed in the console using the hardware map; which is a long process to lookup a PWS if an issue is present. My project is to make the FR1 Console Display easier for the MCO's to pinpoint PWS's without having to lookup additional resources in the process. My project also includes updating Firing Room 1 Console Display to include the F1R Non-Redundant Set. The display does not have good use of space and functionality. PWS numbers were not present in the previous design and are the critical component in efficient understanding and administration of the consoles. Part of the process includes getting feedback from the customer, instead of just emailing them with a question, we made a proposal with changes so they could respond and give us their input; which proved to be an effective method for engaging them. In order to do this I had to use the Display Editor (DE) tool developed by NASA, Paint.Net and Visio. The process I have been using has been Visio to alter the floor layout of Firing Room and take advantage of the white areas, and then I take the altered floor plan into Paint.Net. Once in Paint.Net I put the new floor plan as a background to the standard console display. Paint.Net also serves as a tool to create the new service state bars for the new background; finally I used the DE to assemble everything and setup the right CUI's for each PWS.
Development of a Cross-Flow Fan Powered Quad-Rotor Unmanned Aerial Vehicle
2015-06-01
HVAC Heating ventilation and air conditioning LiPo Lithium - ion polymer PLA Polylactic acid, 3-D printer filament PVA Polyvinyl alcohol PREPREG...control console Figure 79. Rheostat speed control console. 74 c) 6 cell lithium polymer battery Figure 80. 6 Cell LiPo battery . 75 d...Radio control system and versatile unit mounted with zip ties. ......................67 Figure 75. LiPo batteries and parallel battery connector
STS-116/ISS 12A.1 flight controllers on console during EVA #4
2006-12-18
JSC2006-E-54451 (17 Dec. 2006) --- Astronauts Stephen K. Robinson and Joseph R. Tanner, spacecraft communicators (CAPCOM), communicate with the STS-116 crew and its spacewalkers participating in an unprecedented fourth session of extravehicular activity on the same shuttle mission. The two spacewalk veterans are seated at the CAPCOM console in the space station flight control room (FCR-1) in the Johnson Space Center's Mission Control Center.
STS-125 Flight Controllers on Console - (Orbit Shift)
2009-05-11
JSC2009-E-118817 (11 May 2009) --- Flight controller Mark McDonald monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis? scheduled STS-125 launch to service the Hubble Space Telescope. Liftoff was on time at 2:01 p.m. (EDT) on May 11, 2009 from launch pad 39A at NASA's Kennedy Space Center.
Image dissector control and data system electronics, part 1, part 2, and part 3
NASA Technical Reports Server (NTRS)
1975-01-01
The operating and calibration procedures, design details, and maintenance information for the control console and the associated electronics are presented. Detailed circuit connector information is included which describes the destination of each wire leaving each pin of each circuit board. The schematic diagrams of the circuit boards in the system and of the interconnection between boards and consoles are presented.
STS-56 CAPCOMs Chilton and Brown monitor mission from a console at JSC MCC
1993-04-17
STS056-S-080 (13 April 1993) --- Astronauts Kevin P. Chilton (left) and Curtis L. Brown Jr. are seen at the spacecraft communicator (CAPCOM) console in the flight control room of Houston's Mission Control Center (MCC). The two are part of the CAPCOM team who communicated with the five crewmembers aboard Discovery for the STS-56 mission in Earth orbit.
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA
ATV Engineering Support Team Safety Console Preparation for the Johannes Kepler Mission
NASA Astrophysics Data System (ADS)
Chase, R.; Oliefka, L.
2010-09-01
This paper describes the improvements to be implemented in the Safety console position of the Engineering Support Team(EST) at the Automated Transfer Vehicle(ATV) Control Centre(ATV-CC) for the upcoming ATV Johannes Kepler mission. The ATV missions to the International Space Station are monitored and controlled from the ATV-CC in Toulouse, France. The commanding of ATV is performed by the Vehicle Engineering Team(VET) in the main control room under authority of the Flight Director. The EST performs a monitoring function in a room beside the main control room. One of the EST positions is the Safety console, which is staffed by safety engineers from ESA and the industrial prime contractor, Astrium. The function of the Safety console is to check whether the hazard controls are available throughout the mission as required by the Hazard Reports approved by the ISS Safety Review Panel. Safety console preparation activities were limited prior to the first ATV mission due to schedule constraints, and the safety engineers involved have been working to improve the readiness for ATV 2. The following steps have been taken or are in process, and will be described in this paper: • review of the implementation of Operations Control Agreement Documents(OCADs) that record the way operational hazard controls are performed to meet the needs of the Hazard Reports(typically in Flight Rules and Crew Procedures), • crosscheck of operational control needs and implementations with respect to ATV's first flight observations and post flight evaluations, with a view to identifying additional, obsolete or revised operational hazard controls, • participation in the Flight Rule review and update process carried out between missions, • participation in the assessment of anomalies observed during the first ATV mission, to ensure that any impacts are addressed in the ATV 2 safety documentation, • preparation of a Safety console handbook to provide lists of important safety aspects to be monitored at various stages of the mission, including links to relevant Hazard Reports, Flight Rules, and supporting documentation, • participation to training courses conducted in the frame of the ATV Training Academy(ATAC), and provision of courses related to safety for the other members of the VET and EST, • participation to simulations conducted at ATV-CC, including off-nominal cases. The result of these activities will be an improved level of readiness for the ATV 2 mission.
STS-134 Flight Controllers on Console - Launch.
2011-05-16
JSC2011-E-044228 (16 May 2011) --- Flight director Tony Ceccacci is pictured at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Endeavour's STS-134 launch. Liftoff was at 8:56 a.m. (EDT) on May 16, 2011, from Launch Pad 39A at NASA's Kennedy Space Center. Photo credit: NASA
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080441 (14 May 2010) --- Flight director Richard Jones is pictured at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080454 (14 May 2010) --- Flight director Tony Ceccacci is pictured at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
HoloHands: games console interface for controlling holographic optical manipulation
NASA Astrophysics Data System (ADS)
McDonald, C.; McPherson, M.; McDougall, C.; McGloin, D.
2012-10-01
The increased application of holographic optical manipulation techniques within the life sciences has sparked the development of accessible interfaces for control of holographic optical tweezers. Of particular interest are those that employ familiar, commercially available technologies. Here we present the use of a low cost games console interface, the Microsoft Kinect for the control of holographic optical tweezers and a study into the effect of using such a system upon the quality of trap generated.
STS-125 Flight Controllers on Console During HST Grapple - Orbit 1. Flight Director: Tony Ceccacci
2009-05-13
JSC2009-E-119745 (13 May 2009) --- Flight director Tony Ceccacci (left) and astronaut Dan Burbank, STS-125 spacecraft communicator (CAPCOM), monitor data at their consoles in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day three activities. The Hubble Space Telescope, grappled by Space Shuttle Atlantis? remote manipulator system (RMS), is visible on one of the big screens.
STS-125 Flight Controllers on Console During HST Grapple - Orbit 1. Flight Director: Tony Ceccacci
2009-05-13
JSC2009-E-119746 (13 May 2009) --- Flight director Tony Ceccacci (left) and astronaut Dan Burbank, STS-125 spacecraft communicator (CAPCOM), monitor data at their consoles in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during flight day three activities. The Hubble Space Telescope, grappled by Space Shuttle Atlantis? remote manipulator system (RMS), is visible on one of the big screens.
Stapf, Jonas; Meissner, Kay Michael; Niethammer, Thomas; Lahner, Matthias; Wagenhäuser, Markus; Müller, Peter E.; Pietschmann, Matthias F.
2016-01-01
Introduction The Nintendo Wii game console is already used as an additional training device for e.g. neurological wards. Still there are limited data available regarding orthopedic rehabilitation. The authors’ objective was to examine whether the Nintendo Wii is an appropriate and safe tool in rehabilitation after orthopedic knee surgery. Material and methods A prospective, randomized, controlled study comparing standard physiotherapy vs. standard physiotherapy plus game console training (Wii group) in patients having anterior cruciate ligament (ACL) repair or knee arthroplasty was conducted. The subjects of the Wii group (n = 17; mean age: 54 ±19 years) performed simple knee exercises daily under the supervision of a physiotherapist in addition to the normal rehabilitation program. The patients of the control group (n = 13; 52 ±18 years) were treated with physiotherapy only. The participants of both groups completed a questionnaire including the International Knee Documentation Committee (IKDC) score, the Modified Cincinnati Rating System and the Tegner Lysholm Knee Score prior to the operation, before discharge from hospital and four weeks after treatment. Results There was no significant difference in the score results between the Wii and the control group (p > 0.05). Conclusions We demonstrated that physiotherapy using the Nintendo Wii gaming console after ACL reconstruction and knee arthroplasty does not negatively influence outcome. Because training with the Wii device was highly accepted by patients, we see an opportunity whereby additional training with a gaming console for a longer period of time could lead to even better results, regarding the training motivation and the outcome after orthopedic surgery. PMID:27904518
Ficklscherer, Andreas; Stapf, Jonas; Meissner, Kay Michael; Niethammer, Thomas; Lahner, Matthias; Wagenhäuser, Markus; Müller, Peter E; Pietschmann, Matthias F
2016-12-01
The Nintendo Wii game console is already used as an additional training device for e.g. neurological wards. Still there are limited data available regarding orthopedic rehabilitation. The authors' objective was to examine whether the Nintendo Wii is an appropriate and safe tool in rehabilitation after orthopedic knee surgery. A prospective, randomized, controlled study comparing standard physiotherapy vs. standard physiotherapy plus game console training (Wii group) in patients having anterior cruciate ligament (ACL) repair or knee arthroplasty was conducted. The subjects of the Wii group ( n = 17; mean age: 54 ±19 years) performed simple knee exercises daily under the supervision of a physiotherapist in addition to the normal rehabilitation program. The patients of the control group ( n = 13; 52 ±18 years) were treated with physiotherapy only. The participants of both groups completed a questionnaire including the International Knee Documentation Committee (IKDC) score, the Modified Cincinnati Rating System and the Tegner Lysholm Knee Score prior to the operation, before discharge from hospital and four weeks after treatment. There was no significant difference in the score results between the Wii and the control group ( p > 0.05). We demonstrated that physiotherapy using the Nintendo Wii gaming console after ACL reconstruction and knee arthroplasty does not negatively influence outcome. Because training with the Wii device was highly accepted by patients, we see an opportunity whereby additional training with a gaming console for a longer period of time could lead to even better results, regarding the training motivation and the outcome after orthopedic surgery.
Alarm acknowledgement in a nuclear plant control room
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1994-01-01
Alarm acknowledgment can be made not only at the alarm tile array of a given console but via other touch sensitive alarm indications in the screen displays of the monitoring system at the same or other consoles; also, touching one tile can acknowledge multiple alarm sources.
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
Use of small stand-alone Internet nodes as a distributed control system
NASA Astrophysics Data System (ADS)
Goodwin, Robert W.; Kucera, Michael J.; Shea, Michael F.
1994-12-01
For several years, the standard model for accelerator control systems has been workstation consoles connected to VME local stations by a Local Area Network with analog and digital data being accessed via a field bus to custom I/O interface electronics. Commercially available hardware has now made it possible to implement a small stand-alone data acquisition station that combines the LAN connection, the computer, and the analog and digital I/O interface on a single board. This eliminates the complexity of a field bus and the associated proprietary I/O hardware. A minimum control system is one data acquisition station and a Macintosh or workstation console, both connected to the network; larger systems have more consoles and nodes. An implementation of this architecture is described along with performance and operational experience.
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Simulation Training Versus Real Time Console Training for New Flight Controllers
NASA Technical Reports Server (NTRS)
Heaton, Amanda
2010-01-01
For new flight controllers, the two main learning tools are simulations and real time console performance training. These benefit the new flight controllers in different ways and could possibly be improved. Simulations: a) Allow for mistakes without serious consequences. b) Lets new flight controllers learn the working style of other new flight controllers. c) Lets new flight controllers eventually begin to feel like they have mastered the sim world, so therefore they must be competent in the real time world too. Real time: a) Shows new flight controllers some of the unique problems that develop and have to be accounted for when dealing with certain payloads or systems. b) Lets new flight controllers experience handovers - gathering information from the previous shift on what the room needs to be aware of and what still needs to be done. c) Gives new flight controllers confidence that they can succeed in the position they are training for when they can solve real anomalies. How Sims could be improved and more like real-time ops for the ISS Operations Controller position: a) Operations Change Requests to review. b) Fewer anomalies (but still more than real time for practice). c) Payload Planning Manager Handover sheet for the E-1 and E-3 reviews. d) Flight note in system with at least one comment to verify for the E-1 and E-3 reviews How the real time console performance training could be improved for the ISS Operations Controller position: a) Schedule the new flight controller to be on console for four days but with a different certified person each day. This will force them to be the source of knowledge about every OCR in progress, everything that has happened in those few days, and every activity on the timeline. Constellation program flight controllers will have to learn entirely from simulations, thereby losing some of the elements that they will need to have experience with for real time ops. It may help them to practice real time console performance training in the International Space Station or Space Shuttle to gather some general anomaly resolution and day-to-day task management skills.
Checkout systems: Summary report for the universal control and display console
NASA Technical Reports Server (NTRS)
1971-01-01
The development of a unified test equipment checkout concept based on a universal control and display console system is discussed. The checkout requirements are analyzed for the shuttle and space station. Capability, size, utilization requirements and specifications of the ground checkout system are made on the basis of engineering trade-off studies. Recommendations related to the attainment of overall unified test equipment conceptual goals and objectives are submitted.
Reconciliation and consolation in captive bonobos (Pan paniscus).
Palagi, Elisabetta; Paoli, Tommaso; Tarli, Silvana Borgognini
2004-01-01
Although reconciliation in bonobos (Pan paniscus) has previously been described, it has not been analyzed heretofore by the postconflict (PC) match-control (MC) method. Furthermore, although reconciliation has been investigated before in this species, consolation has not. In this study we analyzed agonistic and affiliative contacts in all sex-class combinations to clarify and reevaluate the occurrence of reconciliation in bonobos via the PC-MC method. We also investigated the occurrence of consolation by analyzing the victims' triadic contact tendency (TCT), the influence of the sex of victims, and the relative occurrence of consolation and reconciliation. We collected 167 pairs of PC-MC observations in a captive group of bonobos (in Apeldoorn, The Netherlands). The conciliatory tendency (CCT) we obtained was tendentially lower than the mean value previously found for Yerkes captive chimpanzees. Close relationships, which were present in all female-female (FF) and some male-female (MF) dyads, positively affected reconciliation rates. When only adult PC-MC pairs (157) were considered, the mean TCTs and CCTs did not differ significantly. When we focused on types of PC affiliative contact, in the case of consolation we found a striking preference for sociosexual patterns. As to the relative occurrence of consolation and reconciliation, the highest level of the former was found in the absence of the latter. When reconciliation took place, consolation generally preceded it, suggesting that consolation may be a substitutive behavior. Our findings suggest that even if reconciliation remains the best option, consolation may be an alternative substitute for reconciliation that is used to buffer the tension originating from an unresolved conflict. Reconciliation and consolation are complex phenomena that are probably related to the life history of a group. Given that few studies have been conducted on this subject, we can not at this time make any generalizations regarding conflict resolution in certain species by comparing results among studies. Copyright 2004 Wiley-Liss, Inc.
STS-125 Flight Controllers on Console - (Orbit Shift)
2009-05-11
JSC2009-E-118888 (11 May 2009) --- Flight director Bryan Lunney monitors data at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis? scheduled STS-125 launch to service the Hubble Space Telescope. Liftoff was on time at 2:01 p.m. (EDT) on May 11, 2009 from launch pad 39A at NASA's Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080439 (14 May 2010) --- Flight directors Richard Jones and Tony Ceccacci (foreground) monitor data at their console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080438 (14 May 2010) --- Flight directors Richard Jones and Tony Ceccacci (foreground) monitor data at their console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
A distributed control system for the lower-hybrid current drive system on the Tokamak de Varennes
NASA Astrophysics Data System (ADS)
Bagdoo, J.; Guay, J. M.; Chaudron, G.-A.; Decoste, R.; Demers, Y.; Hubbard, A.
1990-08-01
An rf current drive system with an output power of 1 MW at 3.7 GHz is under development for the Tokamak de Varennes. The control system is based on an Ethernet local-area network of programmable logic controllers as front end, personal computers as consoles, and CAMAC-based DSP processors. The DSP processors ensure the PID control of the phase and rf power of each klystron, and the fast protection of high-power rf hardware, all within a 40 μs loop. Slower control and protection, event sequencing and the run-time database are provided by the programmable logic controllers, which communicate, via the LAN, with the consoles. The latter run a commercial process-control console software. The LAN protocol respects the first four layers of the ISO/OSI 802.3 standard. Synchronization with the tokamak control system is provided by commercially available CAMAC timing modules which trigger shot-related events and reference waveform generators. A detailed description of each subsystem and a performance evaluation of the system will be presented.
Associations between parental rules, style of communication and children's screen time.
Bjelland, Mona; Soenens, Bart; Bere, Elling; Kovács, Éva; Lien, Nanna; Maes, Lea; Manios, Yannis; Moschonis, George; te Velde, Saskia J
2015-10-01
Research suggests an inverse association between parental rules and screen time in pre-adolescents, and that parents' style of communication with their children is related to the children's time spent watching TV. The aims of this study were to examine associations of parental rules and parental style of communication with children's screen time and perceived excessive screen time in five European countries. UP4FUN was a multi-centre, cluster randomised controlled trial with pre- and post-test measurements in each of five countries; Belgium, Germany, Greece, Hungary and Norway. Questionnaires were completed by the children at school and the parent questionnaire was brought home. Three structural equation models were tested based on measures of screen time and parental style of communication from the pre-test questionnaires. Of the 152 schools invited, 62 (41 %) schools agreed to participate. In total 3325 children (average age 11.2 years and 51 % girls) and 3038 parents (81 % mothers) completed the pre-test questionnaire. The average TV/DVD times across the countries were between 1.5 and 1.8 h/day, while less time was used for computer/games console (0.9-1.4 h/day). The children's perceived parental style of communication was quite consistent for TV/DVD and computer/games console. The presence of rules was significantly associated with less time watching TV/DVD and use of computer/games console time. Moreover, the use of an autonomy-supportive style was negatively related to both time watching TV/DVD and use of computer/games console time. The use of a controlling style was related positively to perceived excessive time used on TV/DVD and excessive time used on computer/games console. With a few exceptions, results were similar across the five countries. This study suggests that an autonomy-supportive style of communicating rules for TV/DVD or computer/ games console use is negatively related to children's time watching TV/DVD and use of computer/games console time. In contrast, a controlling style is associated with more screen time and with more perceived excessive screen time in particular. Longitudinal research is needed to further examine effects of parental style of communication on children's screen time as well as possible reciprocal effects. International Standard Randomized Controlled Trial Number Register, registration number: ISRCTN34562078 . Date applied29/07/2011, Date assigned11/10/2011.
STS-116/ISS 12A.1 flight controllers on console during EVA #4
2006-12-18
JSC2006-E-54436 (18 Dec. 2006) --- ISS lead flight director John Curry (right) and astronaut Stephen K. Robinson, at the CAPCOM console, represent part of the busy ground support effort for the add-on spacewalk by the STS-116 crew. Astronaut Joseph R. Tanner, who like Robinson is a veteran of multiple space walks, assisted with CAPCOM duties. While flight controllers in this space station flight control room were busy supporting the spacewalk, so were their counterparts in the space shuttle flight control room, not far away in the Johnson Space Center's Mission Control Center.
Using the Wiimote in Introductory Physics Experiments
ERIC Educational Resources Information Center
Ochoa, Romulo; Rooney, Frank G.; Somers, William J.
2011-01-01
The Wii is a very popular gaming console. An important component of its appeal is the ease of use of its remote controller, popularly known as a Wiimote. This simple-looking but powerful device has a three-axis accelerometer and communicates with the console via Bluetooth protocol. We present two experiments that demonstrate the feasibility of…
Database Tool for Master Console Operators
NASA Technical Reports Server (NTRS)
Ferrell, Sean
2018-01-01
The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires highly trained and knowledgeable personnel. Master Console Operators (MCO) are currently working on familiarizing themselves with any possible scenario that they may encounter. An intern was recruited to help assist them with creating a tool to use for the process.
STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30
NASA Technical Reports Server (NTRS)
1988-01-01
STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). CBS television camera personnel record MCC activities at Spacecraft Communicator (CAPCOM) and Flight Activities Officer (FAO) (foreground) consoles for '48 Hours' program to be broadcast at a later date. The integrated simulation involved communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5. MCC FCR visual displays are seen in front of the rows of consoles.
INFLIGHT (MISSION CONTROL CENTER) - STS-2 - JSC
1981-11-13
S81-39494 (12 Nov. 1981) --- An overall view of activity in the mission operations control room (MOCR) in Houston?s Mission Control Center (MCC) as viewed from the second front row of consoles during the STS-2 mission. The remote manipulator system (RMS) console is in the immediate foreground. Note TV transmission on the Eidophor screen at front of MOCR and shuttle orbiter marker on tracking map at left indicating the vehicle?s location over the Hawaiian Islands. The downlink was through the Hawaii tracking station. Photo credit: NASA
Techniques for designing rotorcraft control systems
NASA Technical Reports Server (NTRS)
Levine, William S.; Barlow, Jewel
1993-01-01
This report summarizes the work that was done on the project from 1 Apr. 1992 to 31 Mar. 1993. The main goal of this research is to develop a practical tool for rotorcraft control system design based on interactive optimization tools (CONSOL-OPTCAD) and classical rotorcraft design considerations (ADOCS). This approach enables the designer to combine engineering intuition and experience with parametric optimization. The combination should make it possible to produce a better design faster than would be possible using either pure optimization or pure intuition and experience. We emphasize that the goal of this project is not to develop an algorithm. It is to develop a tool. We want to keep the human designer in the design process to take advantage of his or her experience and creativity. The role of the computer is to perform the calculation necessary to improve and to display the performance of the nominal design. Briefly, during the first year we have connected CONSOL-OPTCAD, an existing software package for optimizing parameters with respect to multiple performance criteria, to a simplified nonlinear simulation of the UH-60 rotorcraft. We have also created mathematical approximations to the Mil-specs for rotorcraft handling qualities and input them into CONSOL-OPTCAD. Finally, we have developed the additional software necessary to use CONSOL-OPTCAD for the design of rotorcraft controllers.
STS-134 Orbit 2 flight controllers on consoles
2011-05-17
JSC2011-E-045472 (17 May 2011) --- A scale model of HM Bark Endeavour, namesake for the space shuttle currently making its final flight, adorns a console in the space shuttle flight control room in Mission Control in Houston. This model was first displayed in 1992 in the old shuttle control room during STS-49, the inaugural flight of the shuttle Endeavour. It was built by Dan Willett of JSC's Information Resources Directorate. The original sailing ship Endeavour was commanded by Lt. James Cook on a scientific voyage to the South Pacific, Australia and New Zealand from 1768 to 1771. Photo credit: NASA
EVA console personnel during STS-61 simulations
1993-09-01
Susan P. Rainwater monitors an extravehicular activity (EVA) simulation from the EVA console at JSC's Mission Control Center (MCC) during joint integrated simulations for the STS-61 mission. Astronauts assigned to extravehicular activity (EVA) tasks with the Hubble Space Telescope (HST) were simultaneously rehearsing in a neutral buoyancy tank at the Marshall Space Flight Center (MSFC) in Alabama.
39. View of checkout indicator computer console for DR beams, ...
39. View of checkout indicator computer console for DR beams, TR chains, and special checkout target control located in CSMR in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Replicas of Snoopy and Charlie Brown decorate top of console in MCC
NASA Technical Reports Server (NTRS)
1969-01-01
Replicas of Snoopy and Charlie Brown, the two characters from Charles Schulz's syndicated comic strip 'Peanuts', decorate the top of a console in the Mission Operations Control Room in the Mission Control Center, bldg 30, on the first day of the Apollo 10 lunar orbit mission. During the Apollo 10 lunar orbit operations the Lunar Module will be called Snoopy when it is separated from the Command/Service Modules. The code words for the Command Module will be Charlie Brown.
STS-97 WFCR launch Day activities
2000-12-01
JSC2000-E-29806 (30 November 2000) --- (From left) Astronauts Scott J. Kelly (Lt. Cdr., USN) , Dominic L. Gorie (Captain, USN) and Christopher J. Loria (Major, USMC), at the spacecraft communicator (CAPCOM) console in the shuttle flight control room (WFCR) in Houston's Mission Control Center (MCC), monitor audio from the crew onboard Endeavour just prior to liftoff of STS-97. The CAPCOM console is reponsible for communicating the largest majority of oral messages to the shuttle cew members throughout the duration of all mission.
CONTROL CONSOLE FOR MTR FISSION PRODUCT MONITOR, USED TO DETECT ...
CONTROL CONSOLE FOR MTR FISSION PRODUCT MONITOR, USED TO DETECT BREAKS IN CLADDING OF FUEL ELEMENTS. COUNT-RATE METER IN TOP PANEL INDICATES AMOUNT OF RADIOACTIVITY. LOWER PANELS SUPPLY POWER AND AMPLIFICATION OF SIGNALS GENERATED BY SCINTILLATION COUNTER/PHOTOMULTIPLIER TUBE COMBINATION IN RESPONSE TO RADIOACTIVITY IN A SAMPLE OF THE COOLING WATER. INL NEGATIVE NO. 56-771. Jack L. Anderson, Photographer, 3/15/1956. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
MOSC activitiy during STS-4 mission
1982-06-27
Wide angle view of flight controllers at work in the JSC mission control center during STS-4. Eugene F. Kranz, Deputy Director of Flight Operations at JSC, punches a key on his console in the MOCR during ascent phase of STS-4. Watching other monitors are JSC Director Christopher C. Kraft, Jr. and Neil B. Hutchinson. Beyond the FOD console in the foreground is the public affairs office (PAO) area, where John E. McLeaish, chief of public information, calls out ascent information on Columbia.
Use of Game Console for Rehabilitation of Parkinson's Disease.
Özgönenel, Levent; Çağırıcı, Sultan; Çabalar, Murat; Durmuşoğlu, Gülis
2016-07-01
Parkinson's disease (PD) predisposes to falls due to postural instability and decreased coordination. Postural and coordination exercises could ameliorate the incoordination and decrease falls. In this study, we explored the efficiency of a game console as an adjunct to an exercise program in treating incoordination in patients with PD. Case-control study. In this single-blind, prospective clinical trial, rehabilitation with the Xbox (Microsoft; Washington, USA) game console was used as an adjunct to a standard rehabilitation program. Thirty-three patients with PD at stages 1-3 were enrolled in the study. All patients received the three-times weekly exercise program and electrotherapy to back and hip extensors for 5 weeks. Study patients played catch the ball and obstacle games on the Xbox in addition to the standard exercise program. Patients were evaluated based on the scores from the Timed Up-and-Go Test, the Berg Balance Scale (BBS), and the Unified Parkinson's Disease Rating Scale-II (UPDRS-II). Post-treatment scores were compared between groups. Thirty-three patients were enrolled in the study (15 in the game-console group, and 18 controls). Patients in both groups had improvements in all scores. The end-of-treatment scores were significantly better in the study group compared to the control group in all parameters: UPDRS (10±5 versus 16±6, p=0.002), BBS (53±4 versus 47±8, p=0.004), and TUG (11±4 seconds versus 20±8 seconds, p<0.001). Game-exercise with a game-console was noted to be a significant adjunct to the rehabilitation program in patients with PD in this study.
ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks
NASA Technical Reports Server (NTRS)
Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)
2011-01-01
In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.
Personnel in blue and white FCR bldg 30 during STS-106
2000-09-19
JSC2000-E-22831 (13 September 2000) --- Astronauts Barbara R. Morgan and Chris A. Hadfield listen to downlinked audio from the Space Shuttle Atlantis at the approximate midway point of the STS-106 mission. The two are working at the Spacecraft Communicator (CAPCOM) console in Houston's Mission Control Center (MCC). Nearby is Bill Reeves at the Flight Director console.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... contains payment system electronics; \\7\\ (b) it is configured with an externally mounted steel frame at... drying machines that are built on a unitary frame and share a common console that controls both the... selected wash cycle setting; and (d) the console containing the user interface is made of steel and is...
Medical Operations Console Procedure Evaluation: BME Response to Crew Call Down for an Emergency
NASA Technical Reports Server (NTRS)
Johnson-Troop; Pettys, Marianne; Hurst, Victor, IV; Smaka, Todd; Paul, Bonnie; Rosenquist, Kevin; Gast, Karin; Gillis, David; McCulley, Phyllis
2006-01-01
International Space Station (ISS) Mission Operations are managed by multiple flight control disciplines located at the lead Mission Control Center (MCC) at NASA-Johnson Space Center (JSC). ISS Medical Operations are supported by the complementary roles of Flight Surgeons (Surgeon) and Biomedical Engineer (BME) flight controllers. The Surgeon, a board certified physician, oversees all medical concerns of the crew and the BME provides operational and engineering support for Medical Operations Crew Health Care System. ISS Medical Operations is currently addressing the coordinated response to a crew call down for an emergent medical event, in particular when the BME is the only Medical Operations representative in MCC. In this case, the console procedure BME Response to Crew Call Down for an Emergency will be used. The procedure instructs the BME to contact a Surgeon as soon as possible, coordinate with other flight disciplines to establish a Private Medical Conference (PMC) for the crew and Surgeon, gather information from the crew if time permits, and provide Surgeon with pertinent console resources. It is paramount that this procedure is clearly written and easily navigated to assist the BME to respond consistently and efficiently. A total of five BME flight controllers participated in the study. Each BME participant sat in a simulated MCC environment at a console configured with resources specific to the BME MCC console and was presented with two scripted emergency call downs from an ISS crew member. Each participant used the procedure while interacting with analog MCC disciplines to respond to the crew call down. Audio and video recordings of the simulations were analyzed and each BME participant's actions were compared to the procedure. Structured debriefs were conducted at the conclusion of both simulations. The procedure was evaluated for its ability to elicit consistent responses from each BME participant. Trials were examined for deviations in procedure task completion and/or navigation, in particular the execution of the Surgeon call sequence. Debrief comments were used to analyze unclear procedural steps and to discern any discrepancies between the procedure and generally accepted BME actions. The sequence followed by BME participants differed considerably from the sequence intended by the procedure. Common deviations included the call sequence used to contact Surgeon, the content of BME and crew interaction and the gathering of pertinent console resources. Differing perceptions of task priority and imprecise language seem to have caused multiple deviations from the procedure s intended sequence. The study generated 40 recommendations for the procedure, of which 34 are being implemented. These recommendations address improving the clarity of the instructions, identifying training considerations, expediting Surgeon contact, improving cues for anticipated flight control team communication and identifying missing console tools.
MOCR activity during Day 4 of STS-3 mission
NASA Technical Reports Server (NTRS)
1982-01-01
Major General J.A. Abrahamson, right, talks to JSC Director Christopher C. Kraft, Jr., (seated left) and Space Shuttle Program Manager Glynn S. Lunney on the back row of consoles in the mission operations control room (MOCR) in the Johnson Space Center mission control center. The reflection behind the men is a window for the MOCR viewing room (28772,28775); Abrahamson, second right, talks to JSC's Aaron Cohen, right, as Kraft (seated left) and Lunney listen in mission control (28773); Flight controller J.E. Connor monitors a television transmission from the Space Shuttle Columbia during day 4 of the STS-3 mission. Conner is seated at his INCO console (28774).
Results from the EPL monkey-pod experiment conducted as part of the 1974 NASA/Ames shuttle CVT-2
NASA Technical Reports Server (NTRS)
Rahlmann, D. F.; Kodama, A. M.; Mains, R. C.; Pace, N.
1974-01-01
The participation of the Environmental Physiology Laboratory (EPL) in the general purpose laboratory concept verification test 3 is documented. The EPL Monkey-Pod Experiment was designed to incorporate a 10-12 kg, pig tailed monkey, Macaca nemestrina, into the pod and measure the physiological responses of the animal continuously. Four major elements comprise the EPL Monkey-Pod Experiment System: (1) a fiberglass pod containing the instrumented monkey plus feeder and watering devices, (2) an inner console containing the SKYLAB mass spectrometer with its associated valving and electronic controls, sensing, control and monitoring units for lower body negative pressure, feeder activity, waterer activity, temperatures, and gas metabolism calibration, (3) an umbilical complex comprising gas flow lines and electrical cabling between the inner and outer console and (4) an outer console in principle representing the experiment support to be provided from general spacecraft sources.
Results from the EPL monkey-pod flight experiments conducted aboard the NASA/Ames CV-990, May 1976
NASA Technical Reports Server (NTRS)
Rahlmann, D. F.; Kodama, A. M.; Mains, R. C.; Pace, N.
1976-01-01
The participation of the Environmental Physiology Laboratory (EPL) in the general purpose laboratory concept verification test 3 is documented. The EPL Monkey-Pod Experiment was designed to incorporate a 10-12 kg, pig tailed monkey, Macaca nemestrina, into the pod and measure the physiological responses of the animal continously. Four major elements comprise the EPL Monkey-Pod Experiment System: (1) a fiberglass pod containing the instrumented monkey plus feeder and watering devices, (2) an inner console containing the SKYLAB mass spectrometer with its associated valving and electronic controls, sensing, control and monitoring units for lower body negative pressure, feeder activity, waterer activity, temperatures, and gas metabolism calibration, (3) an umbilical complex comprising gas flow lines and electrical cabling between the inner and outer console and (4) an outer console in principle representing the experiment support to be provided from general space craft sources.
A natural command language for C/3/I applications
NASA Astrophysics Data System (ADS)
Mergler, J. P.
1980-03-01
The article discusses the development of a natural command language and a control and analysis console designed to simplify the task of the operator in field of Command, Control, Communications, and Intelligence. The console is based on a DEC LSI-11 microcomputer, supported by 16-K words of memory and a serial interface component. Discussion covers the language, which utilizes English and a natural syntax, and how it is integrated with the hardware. It is concluded that results have demonstrated the effectiveness of this natural command language.
Replicas of Snoopy and Charlie Brown decorate top of console in MCC
1969-05-18
S69-34314 (18 May 1969) --- Replicas of Snoopy and Charlie Brown, the two characters from Charles Schulz's syndicated comic strip, "Peanuts," decorate the top of a console in the Mission Operations Control Room in the Mission Control Center, Building 30, on the first day of the Apollo 10 lunar orbit mission. During lunar orbit operations, the Lunar Module will be called ?Snoopy? when it is separated from the Command and Service Modules. The code words for the Command Module will be ?Charlie Brown?.
Limperos, Anthony M; Schmierbach, Michael G; Kegerise, Andrew D; Dardis, Frank E
2011-06-01
Many studies have investigated how different technological features impact the experience of playing video games, yet few have focused on how control schemes may affect the play experience. This research employed a between-subjects design to explore the relationship between the type of console played (Nintendo Wii, Playstation 2) and feelings of flow and enjoyment during the game-play experience. Results indicated that participants reported greater feelings of control and enjoyment with a traditional control scheme (Playstation 2) than with the more technologically advanced control scheme (Nintendo Wii). Further mediation analysis showed that enjoyment was driven by the sense of control that participants experienced and not simply by whether they won the game. Theoretical and practical implications are discussed.
View west within the periphery of the load dispatch model ...
View west within the periphery of the load dispatch model board, operator's console is at lower center and button board is at lower right of the photograph; section of model board shown covers substation from Perryman (left) to Frankford (right); instruments at right center of photograph formerly monitored energy usage and were replaced by computerized monitoring system. - Thirtieth Street Station, Load Dispatch Center, Thirtieth & Market Streets, Railroad Station, Amtrak (formerly Pennsylvania Railroad Station), Philadelphia, Philadelphia County, PA
NASA Technical Reports Server (NTRS)
Marsh, Angela L.; Dudley, Stephanie R. B.
2014-01-01
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
Surgical bedside master console for neurosurgical robotic system.
Arata, Jumpei; Kenmotsu, Hajime; Takagi, Motoki; Hori, Tatsuya; Miyagi, Takahiro; Fujimoto, Hideo; Kajita, Yasukazu; Hayashi, Yuichiro; Chinzei, Kiyoyuki; Hashizume, Makoto
2013-01-01
We are currently developing a neurosurgical robotic system that facilitates access to residual tumors and improves brain tumor removal surgical outcomes. The system combines conventional and robotic surgery allowing for a quick conversion between the procedures. This concept requires a new master console that can be positioned at the surgical bedside and be sterilized. The master console was developed using new technologies, such as a parallel mechanism and pneumatic sensors. The parallel mechanism is a purely passive 5-DOF (degrees of freedom) joystick based on the author's haptic research. The parallel mechanism enables motion input of conventional brain tumor removal surgery with a compact, intuitive interface that can be used in a conventional surgical environment. In addition, the pneumatic sensors implemented on the mechanism provide an intuitive interface and electrically isolate the tool parts from the mechanism so they can be easily sterilized. The 5-DOF parallel mechanism is compact (17 cm width, 19cm depth, and 15cm height), provides a 505,050 mm and 90° workspace and is highly backdrivable (0.27N of resistance force representing the surgical motion). The evaluation tests revealed that the pneumatic sensors can properly measure the suction strength, grasping force, and hand contact. In addition, an installability test showed that the master console can be used in a conventional surgical environment. The proposed master console design was shown to be feasible for operative neurosurgery based on comprehensive testing. This master console is currently being tested for master-slave control with a surgical robotic system.
A flight investigation of simulated data link communications during single-pilot IFR flight
NASA Technical Reports Server (NTRS)
Parker, J. F.; Duffy, J. W.; Christensen, D. G.
1983-01-01
A Flight Data Console (FDC) was developed to allow simulation of a digital communications link to replace the current voice communication system used in air traffic control (ATC). The voice system requires manipulation of radio equipment, read-back of clearances, and mental storage of critical information items, all contributing to high workload, particularly during single-pilot operations. This was an inflight study to determine how a digital communications system might reduce cockpit workload, improve flight proficiency, and be accepted by general aviation pilots. Results show that instrument flight, including approach and landing, can be accomplished quite effectively using a digital data link system for ATC communications. All pilots expressed a need for a back-up voice channel. When included, this channel was used sparingly and principally to confirm any item of information about which there might be uncertainty.
NASA Technical Reports Server (NTRS)
Cok, Keith E.
1989-01-01
The Orbital Maneuvering Vehicle (OMV) will be remotely piloted during rendezvous, docking, or proximity operations with target spacecraft from a ground control console (GCC). The real-time mission simulator and graphics being used to design a console pilot-machine interface are discussed. A real-time orbital dynamics simulator drives the visual displays. The dynamics simulator includes a J2 oblate earth gravity model and a generalized 1962 rotating atmospheric and drag model. The simulator also provides a variable-length communication delay to represent use of the Tracking and Data Relay Satellite System (TDRSS) and NASA Communications (NASCOM). Input parameter files determine the graphics display. This feature allows rapid prototyping since displays can be easily modified from pilot recommendations. A series of pilot reviews are being held to determine an effective pilot-machine interface. Pilots fly missions with nominal to 3-sigma dispersions in translational or rotational axes. Console dimensions, switch type and layout, hand controllers, and graphic interfaces are evaluated by the pilots and the GCC simulator is modified for subsequent runs. Initial results indicate a pilot preference for analog versus digital displays and for two 3-degree-of-freedom hand controllers.
Launch Control System Master Console Event Message Reduction
NASA Technical Reports Server (NTRS)
Nguyen, Uyen
2014-01-01
System monitoring and control (SMC) message browsers receive so many messages daily that operators do not need to see. Important messages are often mixed up among the less important ones. My job is to reduce the messages displayed in the message browser so that warning and emergency messages can be seen easily and therefore, responded promptly. There are multiple methods to achieve this. Firstly, duplicate messages should not appear many times in the message browser. Instead, the message should appear only once but with a number that counts the times that it appears. This method is called duplicate message suppression. Secondly, messages that update the most recent state (e.g. up/down) of a component should replace the old-state messages. This method is called state based message correlation. Thirdly, messages that display "normal" alarm level should be suppressed unless it's a response to an operator action. In addition to message reduction, I also work on correcting the severity level and text formats on messages.
BEARS: a multi-mission anomaly response system
NASA Astrophysics Data System (ADS)
Roberts, Bryce A.
2009-05-01
The Mission Operations Group at UC Berkeley's Space Sciences Laboratory operates a highly automated ground station and presently a fleet of seven satellites, each with its own associated command and control console. However, the requirement for prompt anomaly detection and resolution is shared commonly between the ground segment and all spacecraft. The efficient, low-cost operation and "lights-out" staffing of the Mission Operations Group requires that controllers and engineers be notified of spacecraft and ground system problems around the clock. The Berkeley Emergency Anomaly and Response System (BEARS) is an in-house developed web- and paging-based software system that meets this need. BEARS was developed as a replacement for an existing emergency reporting software system that was too closedsource, platform-specific, expensive, and antiquated to expand or maintain. To avoid these limitations, the new system design leverages cross-platform, open-source software products such as MySQL, PHP, and Qt. Anomaly notifications and responses make use of the two-way paging capabilities of modern smart phones.
Crusco, Salvatore; Jackson, Tiffany; Advincula, Arnold
2014-01-01
Robot-assisted laparoscopic surgery is often taught with the surgical mentor at the surgeon console and the trainee at the patient's bedside. The da Vinci dual console (Intuitive Surgical, Sunnyvale, California) allows a surgical mentor to teach with both the mentor and the trainee working at a surgeon console simultaneously. The purpose of this study is to evaluate the effectiveness of the dual console versus the single console for teaching medical students robotic tasks. Forty novice medical students were randomized to either the da Vinci single-console or dual-console group and were taught 4 knot-tying techniques by a surgical mentor. The students were timed while performing the tasks. No statistically significant differences in mean task times were observed between the single- and dual-console groups: interrupted stitch with a 2-handed knot (300 seconds for single vs 294 seconds for dual, P=.59), interrupted stitch with a 1-handed knot (198 seconds for single vs 212 seconds for dual, P=.88), figure-of-8 stitch with a 2-handed knot (261 seconds for single vs 219 seconds for dual, P=.20), and figure-of-8 stitch with a 1-handed knot (200 seconds for single vs 199 seconds for dual, P=.53). No significant difference was observed in performance time when teaching knot-tying techniques to medical students using the da Vinci dual console compared with the single console. More research needs to be performed on the utility of the da Vinci dual console in surgical training.
Jackson, Tiffany; Advincula, Arnold
2014-01-01
Background and Objectives: Robot-assisted laparoscopic surgery is often taught with the surgical mentor at the surgeon console and the trainee at the patient's bedside. The da Vinci dual console (Intuitive Surgical, Sunnyvale, California) allows a surgical mentor to teach with both the mentor and the trainee working at a surgeon console simultaneously. The purpose of this study is to evaluate the effectiveness of the dual console versus the single console for teaching medical students robotic tasks. Methods: Forty novice medical students were randomized to either the da Vinci single-console or dual-console group and were taught 4 knot-tying techniques by a surgical mentor. The students were timed while performing the tasks. Results: No statistically significant differences in mean task times were observed between the single- and dual-console groups: interrupted stitch with a 2-handed knot (300 seconds for single vs 294 seconds for dual, P = .59), interrupted stitch with a 1-handed knot (198 seconds for single vs 212 seconds for dual, P = .88), figure-of-8 stitch with a 2-handed knot (261 seconds for single vs 219 seconds for dual, P = .20), and figure-of-8 stitch with a 1-handed knot (200 seconds for single vs 199 seconds for dual, P = .53). Conclusion: No significant difference was observed in performance time when teaching knot-tying techniques to medical students using the da Vinci dual console compared with the single console. More research needs to be performed on the utility of the da Vinci dual console in surgical training. PMID:25392618
Apollo 13 - Mission Control Console
1970-04-15
S70-35096 (16 April 1970) --- As the problem-plagued Apollo 13 crewmen entered their final 24 hours in space, several persons important to the mission remained attentive at consoles in the Mission Operations Control Room of the Mission Control Center at Manned Spacecraft Center. Among those monitoring communications and serving in supervisory capacities were these four officials from National Aeronautics and Space Administration Headquarters, Washington, D.C.: (from left) Thomas H. McMullen, Office of Manned Space Flight, who served as Shift 1 mission director; Dale Myers, associate administrator, Manned Space Flight; Chester M. Lee of the Apollo Program Directorate, OMSF, Apollo 13 mission director; and Dr. Rocco A. Petrone, Apollo program director, OMSF.
Ivory, James D; Magee, Robert G
2009-06-01
Portable media consoles are becoming extremely popular devices for viewing a number of different types of media content, both for entertainment and for educational purposes. Given the increasingly heavy use of portable consoles as an alternative to traditional television-style monitors, it is important to investigate how physiological and psychological effects of portable consoles may differ from those of television-based consoles, because such differences in physiological and psychological responses may precipitate differences in the delivered content's effectiveness. Because portable consoles are popular as a delivery system for multiple types of media content, such as movies and video games, it is also important to investigate whether differences between the effects of portable and television-based consoles are consistent across multiple types of media. This article reports a 2 x 2 (console: portable or television-based x medium: video game or movie) mixed factorial design experiment with physiological arousal and self-reported flow experience as dependent variables, designed to explore whether console type affects media experiences and whether these effects are consistent across different media. Results indicate that portable media consoles evoke lower levels of physiological arousal and flow experience and that this effect is consistent for both video games and movies. These findings suggest that even though portable media consoles are often convenient compared to television-based consoles, the convenience may come at a cost in terms of the user experience.
Emergency Communications Console
NASA Technical Reports Server (NTRS)
1978-01-01
NASA has applied its communications equipment expertise to development of a communications console that provides, in a compact package only slightly larger than an electric typewriter, all the emergency medical services communications functions needed for a regional hospital. A prototype unit, built by Johnson Space Center, has been installed in the Odessa (Texas) Medical Center Hospital. The hospital is the medical control center for the 17-county Permian Basin Emergency Medical System in west Texas. The console project originated in response to a request to NASA from the Texas governor's office, which sought a better way of providing emergency medical care in rural areas. Because ambulance travel time is frequently long in remote areas of west Texas, it is important that treatment begin at the scene of the emergency rather than at the hospital emergency room. A radio and telephone system linking ambulance emergency technicians and hospital staff makes this possible. But earlier equipment was complex, requiring specialized operators. A highly reliable system was needed to minimize breakdowns and provide controls of utmost simplicity, so that the system could be operated by physicians and nurses rather than by communications specialists. The resulting console has both radio and telephone sections. With the radio equipment, hospital personnel can communicate with ambulance drivers and paramedics, receive incoming electrocardiagrams, consult with other hospitals, page hospital staff and set up a radio-to-telephone "patch." The telephone portion of the system includes a hotline from the Permian Basin Emergency Medical Service's resource control center, an automatic dialer for contacting special care facilities in the Permian Basin network, a hospital intercom terminal and a means of relaying cardioscope displays and other data between hospitals. The integrated system also provides links with local disaster and civil defense organizations and with emergency "Dial 911" control points.
Mentoring console improves collaboration and teaching in surgical robotics.
Hanly, Eric J; Miller, Brian E; Kumar, Rajesh; Hasser, Christopher J; Coste-Maniere, Eve; Talamini, Mark A; Aurora, Alexander A; Schenkman, Noah S; Marohn, Michael R
2006-10-01
One of the most significant limitations of surgical robots has been their inability to allow multiple surgeons and surgeons-in-training to engage in collaborative control of robotic surgical instruments. We report the initial experience with a novel two-headed da Vinci surgical robot that has two collaborative modes: the "swap" mode allows two surgeons to simultaneously operate and actively swap control of the robot's four arms, and the "nudge" mode allows them to share control of two of the robot's arms. The utility of the mentoring console operating in its two collaborative modes was evaluated through a combination of dry laboratory exercises and animal laboratory surgery. The results from surgeon-resident collaborative performance of complex three-handed surgical tasks were compared to results from single-surgeon and single-resident performance. Statistical significance was determined using Student's t-test. Collaborative surgeon-resident swap control reduced the time to completion of complex three-handed surgical tasks by 25% compared to single-surgeon operation of a four-armed da Vinci (P < 0.01) and by 34% compared to single-resident operation (P < 0.001). While swap mode was found to be most helpful during parts of surgical procedures that require multiple hands (such as isolation and division of vessels), nudge mode was particularly useful for guiding a resident's hands during crucially precise steps of an operation (such as proper placement of stitches). The da Vinci mentoring console greatly facilitates surgeon collaboration during robotic surgery and improves the performance of complex surgical tasks. The mentoring console has the potential to improve resident participation in surgical robotics cases, enhance resident education in surgical training programs engaged in surgical robotics, and improve patient safety during robotic surgery.
ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks
NASA Technical Reports Server (NTRS)
Hall, Timothy A.
2011-01-01
In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable
Evaluation of a new imaging tool for use with major trauma cases in the emergency department.
Crönlein, Moritz; Holzapfel, Konstantin; Beirer, Marc; Postl, Lukas; Kanz, Karl-Georg; Pförringer, Dominik; Huber-Wagner, Stefan; Biberthaler, Peter; Kirchhoff, Chlodwig
2016-11-17
The aim of this study was to evaluate potential benefits of a new diagnostic software prototype (Trauma Viewer, TV) automatically reformatting computed tomography (CT) data on diagnostic speed and quality, compared to CT-image data evaluation using a conventional CT console. Multiple trauma CT data sets were analysed by one expert radiology and one expert traumatology fellow independently twice, once using the TV and once using the secondary conventional CT console placed in the CT control room. Actual analysis time and precision of diagnoses assessment were evaluated. The TV and CT-console results were compared respectively, but also a comparison to the initial multiple trauma CT reports assessed by emergency radiology fellows considered as the gold standard was performed. Finally, design and function of the Trauma Viewer were evaluated in a descriptive manner. CT data sets of 30 multiple trauma patients were enrolled. Mean time needed for analysis of one CT dataset was 2.43 min using the CT console and 3.58 min using the TV respectively. Thus, secondary conventional CT console analysis was on average 1.15 min shorter compared to the TV analysis. Both readers missed a total of 11 diagnoses using the secondary conventional CT console compared to 12 missed diagnoses using the TV. However, none of these overlooked diagnoses resulted in an Abbreviated Injury Scale (AIS) > 2 corresponding to life threatening injuries. Even though it took the two expert fellows a little longer to analyse the CT scans on the prototype TV compared to the CT console, which can be explained by the new user interface of the TV, our preliminary results demonstrate that, after further development, the TV might serve as a new diagnostic feature in the trauma room management. Its high potential to improve time and quality of CT-based diagnoses might help in fast decision making regarding treatment of severely injured patients.
Transportable telemetry workstation
NASA Technical Reports Server (NTRS)
Collins, Aaron S.
1989-01-01
The goal was to complete the design of a prototype for a Transportable Telemetry Workstation (TTW). The Macintosh 2 is used to provide a low-cost system which can house real-time cards mounted on the NuBus inside the Macintosh 2 plus provide a standardized user interface on the Macintosh 2 console. Prior to a telemetry run, the user will be able to configure his real-time telemetry processing functions from the Macintosh 2 console. During a telemetry run, the real-time cards will store the telemetry data directly on a hard disk while permitting viewing of the data cards on the Macintosh 2 console on various selectable formats. The user will view the cards in terms of the functions they perform and the selectable paths through the cards, it is not required to become involved directly in hardware issue except in terms of the functional configuration of the system components. The TTW will accept telemetry data from an RS422 serial input data bus, pass it through a frame synchronizer card and on to a real time controller card via a telemetry backplane bus. The controller card will then route the data to a hard disk through a SCSI interface, and/or to a user interface on the Macintosh 2 console by way of the Macintosh 2 NuBus. The three major components to be designed, therefore, are the TTW Controller Card, the TTW Synchronizer Card, and the NuBus/Macintosh 2 User Interface. Design and prototyping of this state-of-the-art, transportable, low-cost, easy-to-use multiprocessor telemetry system is continuing. Other functions are planned for the future.
Transportable telemetry workstation
NASA Astrophysics Data System (ADS)
Collins, Aaron S.
1989-09-01
The goal was to complete the design of a prototype for a Transportable Telemetry Workstation (TTW). The Macintosh 2 is used to provide a low-cost system which can house real-time cards mounted on the NuBus inside the Macintosh 2 plus provide a standardized user interface on the Macintosh 2 console. Prior to a telemetry run, the user will be able to configure his real-time telemetry processing functions from the Macintosh 2 console. During a telemetry run, the real-time cards will store the telemetry data directly on a hard disk while permitting viewing of the data cards on the Macintosh 2 console on various selectable formats. The user will view the cards in terms of the functions they perform and the selectable paths through the cards, it is not required to become involved directly in hardware issue except in terms of the functional configuration of the system components. The TTW will accept telemetry data from an RS422 serial input data bus, pass it through a frame synchronizer card and on to a real time controller card via a telemetry backplane bus. The controller card will then route the data to a hard disk through a SCSI interface, and/or to a user interface on the Macintosh 2 console by way of the Macintosh 2 NuBus. The three major components to be designed, therefore, are the TTW Controller Card, the TTW Synchronizer Card, and the NuBus/Macintosh 2 User Interface. Design and prototyping of this state-of-the-art, transportable, low-cost, easy-to-use multiprocessor telemetry system is continuing. Other functions are planned for the future.
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
Roxberg, Åsa; Brunt, David; Rask, Mikael; da Silva, António Barbosa
2013-03-01
The aim of the study was to explore the meaning of consolation as experienced by Job in the Book of Job and as presented in literature and how consolation relates to suffering and care. The study's theoretical design applied Ricoeur's view on phenomenology and hermeneutics. The resulting themes were as follows: consolation that is present, that originates in confrontation, that keeps suffering at a distance, that does not alleviate suffering, that originates in experience from giving comfort, and that facilitates a change of perspective. The authentic and caring consolation accepts the sufferer's incomprehensible "otherness" but however provides no answers about how to console.
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
1973-07-01
SL3-108-1288 (July-Sept. 1973) --- Astronaut Owen K. Garriott, science pilot of the Skylab 3 mission, is stationed at the Apollo Telescope Mount (ATM) console in the Multiple Docking Adapter (MDA) of the Skylab space station in Earth orbit. This picture was taken with a handheld 35mm Nikon camera. Astronauts Garriott, Alan L. Bean and Jack R. Lousma remained with the Skylab space station cluster in orbit for 59 days conducting numerous medical, scientific and technological experiments. In orbit the MDA functions as a major experiment control center for solar observations. From this console the astronauts actively control the ATM solar physics telescopes. Photo credit: NASA
Um, Keehong; Yoo, Sooyeup
2013-10-01
Protocol for digital multiplex with 512 pieces of information is increasingly adopted in the design of illumination systems. In conventional light-emitting diode systems, the receivers are connected in parallel and each of the receiving units receives all the data from the master dimmer console, but each receiving unit operates by recognizing as its own data that which corresponds to the assigned number of the receiver. Because the serial numbers of illumination devices are transmitted in binary code, synchronization is too complicated to be used properly. In order to improve the protocol of illumination control systems, we propose an algorithm of protocol reception to install and manage the system in a simpler and more convenient way. We propose the systems for controlling the light-emitting diode illumination of simplified receiver slaves adopting the digital multiplex-512 protocol where master console and multiple receiver slaves are connected in a daisy chain fashion. The digital multiplex-512 data packet is received according to the sequence order of their locations from the console, without assigning the sequence number of each channel at the receiving device. The purpose of this paper is to design a simple and small-sized controller for the control systems of lamps and lighting adopting the digital multiplex-512 network.
Volonté, Francesco; Buchs, Nicolas C; Pugin, François; Spaltenstein, Joël; Schiltz, Boris; Jung, Minoa; Hagen, Monika; Ratib, Osman; Morel, Philippe
2013-09-01
Computerized management of medical information and 3D imaging has become the norm in everyday medical practice. Surgeons exploit these emerging technologies and bring information previously confined to the radiology rooms into the operating theatre. The paper reports the authors' experience with integrated stereoscopic 3D-rendered images in the da Vinci surgeon console. Volume-rendered images were obtained from a standard computed tomography dataset using the OsiriX DICOM workstation. A custom OsiriX plugin was created that permitted the 3D-rendered images to be displayed in the da Vinci surgeon console and to appear stereoscopic. These rendered images were displayed in the robotic console using the TilePro multi-input display. The upper part of the screen shows the real endoscopic surgical field and the bottom shows the stereoscopic 3D-rendered images. These are controlled by a 3D joystick installed on the console, and are updated in real time. Five patients underwent a robotic augmented reality-enhanced procedure. The surgeon was able to switch between the classical endoscopic view and a combined virtual view during the procedure. Subjectively, the addition of the rendered images was considered to be an undeniable help during the dissection phase. With the rapid evolution of robotics, computer-aided surgery is receiving increasing interest. This paper details the authors' experience with 3D-rendered images projected inside the surgical console. The use of this intra-operative mixed reality technology is considered very useful by the surgeon. It has been shown that the usefulness of this technique is a step toward computer-aided surgery that will progress very quickly over the next few years. Copyright © 2012 John Wiley & Sons, Ltd.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
Test Project Engineer Rick Brown, left, and Master Console Operator Jason Robinson, both with Jacobs, monitor operations from their consoles in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
2013-09-10
SL2-X9-747 (June 1973) --- Astronaut Paul J. Weitz, Skylab 2 pilot, mans the control and display console of the Apollo Telescope Mount (ATM) in this onboard view photographed in Earth orbit. The ATM C&D console is located in the Multiple Docking Adapter (MDA) of the Skylab 1/2 space station. Weitz, along with astronaut Charles Conrad Jr., commander, and scientist-astronaut Joseph P. Kerwin, science pilot, went on to successfully complete a 28-day mission in Earth orbit. Photo credit: NASA
Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less
Activity in the Mission Control Center during Apollo 14
1971-02-04
S71-17610 (4 Feb. 1971) --- Partial view of activity in the Mission Operations Control Room in the Mission Control Center at the time the Apollo 14 S-IVB stage impacted on the lunar surface. The flight director's console is in the foreground. Eugene F. Kranz, chief of the MSC Flight Control Division, is in the right foreground. Seated at the console is Glynn S. Lunney, head of the Flight Director Office, Flight Control Division. Facing the camera is Gerald D. Griffin, flight director of the Third (Gold) Team. A seismic reading from the impact can be seen in the center background. The S-IVB impacted on the lunar surface at 1:40:54 a.m. (CST), Feb. 4, 1971, about 90 nautical miles south-southwest of the Apollo 12 passive seismometer. The energy release was comparable to 11 tons of TNT.
Expedition 13 flight controller on console during mission - Orbit 1, BFCR
2006-08-31
JSC2006-E-38926 (31 Aug. 2006) --- Flight director Rick LaBrode discusses Expedition 13 mission activities with another flight controller (out of frame) in the Station (Blue) Flight Control Room in Houston's Mission Control Center.
2001-08-16
JSC2001-E-25466 (16 August 2001) --- Flight director Bryan Austin studies data at his console in the shuttle flight control room (WFCR) in Houston's Mission Control Center (MCC) during the STS-105 mission.
STS-114 Mission Support - Flight Controllers on Launch Day
2005-07-26
Documentation of flight controllers in the White Flight Control Room (WFCR) on STS-114 Launch Day, July 26, 2005. View of Phil Engelauf and Flight Director Paul Hill standing at the Mission Operations Directorate (MOD) console.
Montero-Alía, Pilar; Muñoz-Ortiz, Laura; Jiménez-González, Mercè; Benedicto-Pañell, Carla; Altimir-Losada, Salvador; López-Colomer, Yolanda; Prat-Rovira, Josep; Amargant-Rubio, Joan Francesc; Jastes, Sheila Mendes; Moreno-Buitrago, Ana; Rodríguez-Pérez, M Carmen; Teixidó-Vargas, Cristina; Albarrán-Sánchez, José Luís; Candel-Gil, Anna; Serra-Serra, Domènec; Martí-Cervantes, Juan José; Sánchez-Pérez, Carlos Andrés; Sañudo-Blanco, Lidia; Dolader-Olivé, Sònia; Torán-Monserrat, Pere
2016-01-12
Balance alteration is a risk factor for falls in elderly individuals that has physical, psychological and economic consequences. The objectives of this study are to evaluate the usefulness of an intervention utilizing the Nintendo™ Wii console in order to improve balance, thereby decreasing both the fear of falling as well as the number of falls, and to evaluate the correlation between balance as determined by the console and the value obtained in the Tinetti tests and the one foot stationary test. This is a controlled, randomized clinical trial of individual assignment, carried out on patients over 70 years in age, from five primary care centers in the city of Mataró (Barcelona). 380 patients were necessary for the intervention group that carried out the balance board exercises in 2 sessions per week for a 3 month period, and 380 patients in the control group who carried out their usual habits. Balance was evaluated using the Tinetti test, the one foot stationary test and with the console, at the start of the study, at the end of the intervention (3 months) and one year later. Quarterly telephone follow-up was also conducted to keep track of falls and their consequences. The study aimed to connect the community with a technology that may be an easy and fun way to assist the elderly in improving their balance without the need to leave home or join rehabilitation groups, offering greater comfort for this population and decreasing healthcare costs since there is no need for specialized personnel. Current Control Trial NCT02570178.
Adaptive Motor Resistance Video Game Exercise Apparatus and Method of Use Thereof
NASA Technical Reports Server (NTRS)
Reich, Alton (Inventor); Shaw, James (Inventor)
2015-01-01
The invention comprises a method and/or an apparatus using computer configured exercise equipment and an electric motor provided physical resistance in conjunction with a game system, such as a video game system, where the exercise system provides real physical resistance to a user interface. Results of user interaction with the user interface are integrated into a video game, such as running on a game console. The resistance system comprises: a subject interface, software control, a controller, an electric servo assist/resist motor, an actuator, and/or a subject sensor. The system provides actual physical interaction with a resistance device as input to the game console and game run thereon.
View of the mission control center during STS 51-I
1985-08-27
51I-S-189 (27 Aug 1985) --- View of the mission control center (MCC) during STS 51-I as flight controllers watch monitors at consoles to follow the extravehicular activity of two of the Discovery's astronauts.
STS-134 Flight Controllers on Console - Landing
2011-06-01
JSC2011-E-050134 (1 June 2011) --- An overall view of the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center photographed during STS-134/ULF-6 landing day activities. Photo credit: NASA
STS-134 Flight Controllers on Console - Landing
2011-06-01
JSC2011-E-050159 (1 June 2011) --- An overall view of the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center photographed during STS-134/ULF-6 landing day activities. Photo credit: NASA
Human factors in command and control for the Los Angeles Fire Department.
Harper, W R
1974-03-01
Ergonomics owes much of its operations and systems heritage to military research. Since public safety systems such as police, fire departments and civil defence organisations are quasi-military in nature, one may reasonably use the findings from military ergonomics research to extrapolate design data for use in a decision-making system. This article discusses a case study concerning Human Factors in command and control for the Los Angeles Fire Department. The case involved transfer from a manual dispatch system involving three geographic areas of metropolitan Los Angeles to one central computer-aided command and control system. Comments are made on console mock-ups, environmental factors in the Control Centre placement of the consoles. Because of extreme delays in procurement of the recommended hardware it is doubtful that empirical testing of the ergonomics aspect of the system will take place.
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
36. View of preset counter (PC) console and tracking console ...
36. View of preset counter (PC) console and tracking console on right, located in MWOC facility in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
21 CFR 870.4220 - Cardiopulmonary bypass heart-lung machine console.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Cardiopulmonary bypass heart-lung machine console... Cardiopulmonary bypass heart-lung machine console. (a) Identification. A cardiopulmonary bypass heart-lung machine... heart-lung machine. The console is designed to interface with the basic units used in a gas exchange...
Considerations for human-machine interfaces in tele-operations
NASA Technical Reports Server (NTRS)
Newport, Curt
1991-01-01
Numerous factors impact on the efficiency of tele-operative manipulative work. Generally, these are related to the physical environment of the tele-operator and how he interfaces with robotic control consoles. The capabilities of the operator can be influenced by considerations such as temperature, eye strain, body fatigue, and boredom created by repetitive work tasks. In addition, the successful combination of man and machine will, in part, be determined by the configuration of the visual and physical interfaces available to the teleoperator. The design and operation of system components such as full-scale and mini-master manipulator controllers, servo joysticks, and video monitors will have a direct impact on operational efficiency. As a result, the local environment and the interaction of the operator with the robotic control console have a substantial effect on mission productivity.
15. NBS TOP SIDE CONTROL ROOM. THE SUIT SYSTEMS CONSOLE ...
15. NBS TOP SIDE CONTROL ROOM. THE SUIT SYSTEMS CONSOLE IS USED TO CONTROL AIR FLOW AND WATER FLOW TO THE UNDERWATER SPACE SUIT DURING THE TEST. THE SUIT SYSTEMS ENGINEER MONITORS AIR FLOW ON THE PANEL TO THE LEFT, AND SUIT DATA ON THE COMPUTER MONITOR JUST SLIGHTLY TO HIS LEFT. WATER FLOW IS MONITORED ON THE PANEL JUST SLIGHTLY TO HIS RIGHT AND TEST VIDEO TO HIS FAR RIGHT. THE DECK CHIEF MONITORS THE DIVER'S DIVE TIMES ON THE COMPUTER IN THE UPPER RIGHT. THE DECK CHIEF LOGS THEM IN AS THEY ENTER THE WATER, AND LOGS THEM OUT AS THEY EXIT THE WATER. THE COMPUTER CALCULATES TOTAL DIVE TIME. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL
On-Orbit Engineering and Vehicle Integration Poster Presentation
NASA Technical Reports Server (NTRS)
Heimerdinger, Madison
2014-01-01
One of the duties of the MER Managers is getting the consoles to review and sign Electronic Flight Notes (EFN) and Mission Action Requests (Chit) before they are due. Chits and EFNs and are accessible through the Mission Control Center - Houston (MCC-H) Gateway. Chits are the official means of documenting questions and answers, technical direction, real-time changes to Flight Rules (FR) and procedures, request for analysis, etc. between various consoles concerning on-orbit operations. EFNs are documents used by the Flight Control Team (FCT) to communicate precise details between console positions and manage real time changes to FR and Systems Operation Data File (SODF) procedures. On GMT 2013/345 the External Active Thermal Control System (EATCS) on the Columbus (COL) Moderate Temperature Loop (MTL) Interface Heat Exchanger (IFHX) shut down due to low temperatures. Over the next couple of days, the core temperature of COL MT IFHX dropped due to the failure of the Flow Control Valve (FCV). After the temperature drop was discovered, heaters were turned on to bring the temperatures back to nominal. After the incident occurred, a possible freeze threat was discovered that could have ruptured the heat exchanger. The COL MT IFHX rupturing would be considered a catastrophic failure and potentially result in a loss of the vehicle and/or the lives of the International Space Station (ISS) crew members
PBF Control Building (PER619). Interior of control room shows control ...
PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
34. PRIMARY FLIGHT CONTROL STATION AFT LOOKING FORWARD ON ...
34. PRIMARY FLIGHT CONTROL STATION - AFT LOOKING FORWARD ON PORT SIDE SHOWING FLIGHT DECK LIGHTING BOARD, ARRESTING GEAR CONTROL CONSOLE AND FRESNEL LENS OPTICAL LANDING SYSTEM. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA
2001-07-16
JSC2001-E-21584 (16 July 2001) --- STS-104 Orbit 1 flight director Paul Hill discusses mission related matters over the phone at his console in the shuttle flight control room (WFCR) in Houston's Mission Control Center (MCC).
2001-07-16
JSC2001-E-21576 (16 July 2001) --- ISS Orbit 1 flight director Sally Davis discusses STS-104 matters with other mission support staff at her console in the ISS flight control room (BFCR) in Houston's Mission Control Center (MCC).
Documentation of new mission control center White Flight Control Room (FLCR)
1995-06-06
Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).
NASA Technical Reports Server (NTRS)
Scott, David W.; Underwood, Debrah (Technical Monitor)
2002-01-01
At the Marshall Space Flight Center's (MSFC) Payload Operations Integration Center (POIC) for International Space Station (ISS), each flight controller maintains detailed logs of activities and communications at their console position. These logs are critical for accurately controlling flight in real-time as well as providing a historical record and troubleshooting tool. This paper describes logging methods and electronic formats used at the POIC and provides food for thought on their strengths and limitations, plus proposes some innovative extensions. It also describes an inexpensive PC-based scheme for capturing and/or transcribing audio clips from communications consoles. Flight control activity (e.g. interpreting computer displays, entering data/issuing electronic commands, and communicating with others) can become extremely intense. It's essential to document it well, but the effort to do so may conflict with actual activity. This can be more than just annoying, as what's in the logs (or just as importantly not in them) often feeds back directly into the quality of future operations, whether short-term or long-term. In earlier programs, such as Spacelab, log keeping was done on paper, often using position-specific shorthand, and the other reader was at the mercy of the writer's penmanship. Today, user-friendly software solves the legibility problem and can automate date/time entry, but some content may take longer to finish due to individual typing speed and less use of symbols. File layout can be used to great advantage in making types of information easy to find, and creating searchable master logs for a given position is very easy and a real lifesaver in reconstructing events or researching a given topic. We'll examine log formats from several console position, and the types of information that are included and (just as importantly) excluded. We'll also look at when a summary or synopsis is effective, and when extensive detail is needed.
NASA Technical Reports Server (NTRS)
Dudley, Stephanie R. B.; Marsh, Angela L.
2014-01-01
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
Metamorphoses of ONAV console operations: From prototype to real time application
NASA Technical Reports Server (NTRS)
Millis, Malise; Wang, Lui
1991-01-01
The ONAV (Onboard Navigation) Expert System is being developed as a real time console assistant to the ONAV flight controller for use in the Mission Control Center at the Johnson Space Center. Currently the entry and rendezvous systems are in verification, and the ascent is being prototyped. To arrive at this stage, from a prototype to real world application, the ONAV project has had to deal with not only AI issues but operating environment issues. The AI issues included the maturity of AI languages and the debugging tools, what is verification, and availability, stability, and the size of the expert pool. The environmental issues included real time data acquisition, hardware stability, and how to achieve acceptance by users and management.
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
The effects of a dynamic graphical model during simulation-based training of console operation skill
NASA Technical Reports Server (NTRS)
Farquhar, John D.; Regian, J. Wesley
1993-01-01
LOADER is a Windows-based simulation of a complex procedural task. The task requires subjects to execute long sequences of console-operation actions (e.g., button presses, switch actuations, dial rotations) to accomplish specific goals. The LOADER interface is a graphical computer-simulated console which controls railroad cars, tracks, and cranes in a fictitious railroad yard. We hypothesized that acquisition of LOADER performance skill would be supported by the representation of a dynamic graphical model linking console actions to goal and goal states in the 'railroad yard'. Twenty-nine subjects were randomly assigned to one of two treatments (i.e., dynamic model or no model). During training, both groups received identical text-based instruction in an instructional-window above the LOADER interface. One group, however, additionally saw a dynamic version of the bird's-eye view of the railroad yard. After training, both groups were tested under identical conditions. They were asked to perform the complete procedure without guidance and without access to either type of railroad yard representation. Results indicate that rather than becoming dependent on the animated rail yard model, subjects in the dynamic model condition apparently internalized the model, as evidenced by their performance after the model was removed.
Engelhardt, Christopher R; Mazurek, Micah O
2014-07-01
Environmental correlates of problem behavior among individuals with autism spectrum disorder remain relatively understudied. The current study examined the contribution of in-room (i.e. bedroom) access to a video game console as one potential correlate of problem behavior among a sample of 169 boys with autism spectrum disorder (ranging from 8 to 18 years of age). Parents of these children reported on (1) whether they had specific rules regulating their child's video game use, (2) whether their child had in-room access to a variety of screen-based media devices (television, computer, and video game console), and (3) their child's oppositional behaviors. Multivariate regression models showed that in-room access to a video game console predicted oppositional behavior while controlling for in-room access to other media devices (computer and television) and relevant variables (e.g. average number of video game hours played per day). Additionally, the association between in-room access to a video game console and oppositional behavior was particularly large when parents reported no rules on their child's video game use. The current findings indicate that both access and parental rules regarding video games warrant future experimental and longitudinal research as they relate to problem behavior in boys with autism spectrum disorder. © The Author(s) 2013.
Video game console usage and US national energy consumption: Results from a field-metering study
Desroches, Louis-Benoit; Greenblatt, Jeffery B.; Pratt, Stacy; ...
2014-10-23
There has been an increased in attention placed on the energy consumption of miscellaneous electronic loads in buildings by energy analysts and policymakers in recent years. The share of electricity consumed by consumer electronics in US households has increased in the last decade. Many devices, however, lack robust energy use data, making energy consumption estimates difficult and uncertain. Video game consoles are high-performance machines present in approximately half of all households and can consume a considerable amount of power. The precise usage of game consoles has significant uncertainty, however, leading to a wide range of recent national energy consumption estimates.more » We present here an analysis based on field-metered usage data, collected as part of a larger field metering study in the USA. This larger study collected data from 880 households in 2012 on a variety of devices, including 113 game consoles (the majority of which are Generation 7 consoles). From our metering, we find that although some consoles are left on nearly 24 h/day, the overall average usage is lower than many other studies have assumed, leading to a US national energy consumption estimate of 7.1 TWh in 2012. Nevertheless, there is an opportunity to reduce energy use with proper game console power management, as a substantial amount of game console usage occurs with the television turned off. The emergence of Generation 8 consoles may increase national energy consumption.« less
Video game console usage and US national energy consumption: Results from a field-metering study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Desroches, Louis-Benoit; Greenblatt, Jeffery B.; Pratt, Stacy
There has been an increased in attention placed on the energy consumption of miscellaneous electronic loads in buildings by energy analysts and policymakers in recent years. The share of electricity consumed by consumer electronics in US households has increased in the last decade. Many devices, however, lack robust energy use data, making energy consumption estimates difficult and uncertain. Video game consoles are high-performance machines present in approximately half of all households and can consume a considerable amount of power. The precise usage of game consoles has significant uncertainty, however, leading to a wide range of recent national energy consumption estimates.more » We present here an analysis based on field-metered usage data, collected as part of a larger field metering study in the USA. This larger study collected data from 880 households in 2012 on a variety of devices, including 113 game consoles (the majority of which are Generation 7 consoles). From our metering, we find that although some consoles are left on nearly 24 h/day, the overall average usage is lower than many other studies have assumed, leading to a US national energy consumption estimate of 7.1 TWh in 2012. Nevertheless, there is an opportunity to reduce energy use with proper game console power management, as a substantial amount of game console usage occurs with the television turned off. The emergence of Generation 8 consoles may increase national energy consumption.« less
Current Role of Computer Navigation in Total Knee Arthroplasty.
Jones, Christopher W; Jerabek, Seth A
2018-01-31
Computer-assisted surgical (CAS) navigation has been developed with the aim of improving the accuracy and precision of total knee arthroplasty (TKA) component positioning and therefore overall limb alignment. The historical goal of knee arthroplasty has been to restore the mechanical alignment of the lower limb by aligning the femoral and tibial components perpendicular to the mechanical axis of the femur and tibia. Despite over 4 decades of TKA component development and nearly 2 decades of interest in CAS, the fundamental question remains; does the alignment goal and/or the method of achieving that goal affect the outcome of the TKA in terms of patient-reported outcome measures and/or overall survivorship? The quest for reliable and reproducible achievement of the intraoperative alignment goal has been the primary motivator for the introduction, development, and refinement of CAS navigation. Numerous proprietary systems now exist, and rapid technological advancements in computer processing power are stimulating further development of robotic surgical systems. Three categories of CAS can be defined: image-based large-console navigation; imageless large-console navigation, and more recently, accelerometer-based handheld navigation systems have been developed. A review of the current literature demonstrates that there are enough well-designed studies to conclude that both large-console CAS and handheld navigation systems improve the accuracy and precision of component alignment in TKA. However, missing from the evidence base, other than the subgroup analysis provided by the Australian Orthopaedic Association National Joint Replacement Registry, are any conclusive demonstrations of a clinical superiority in terms of improved patient-reported outcome measures and/or decreased cumulative revision rates in the long term. Few authors would argue that accuracy of alignment is a goal to ignore; therefore, in the absence of clinical evidence, many of the arguments against the use of large-console CAS navigation center on the prohibitive cost of the systems. The utilization of low-cost, handheld CAS navigation systems may therefore bridge this important gap, and over time, further clinical evidence may emerge. Copyright © 2018 Elsevier Inc. All rights reserved.
STS-125 Entry flight controllers on console with Flight Director Norman Knight
2009-05-24
JSC2009-E-121510 (24 May 2009) --- Flight controllers in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center watch the big screens during the landing of Space Shuttle Atlantis (STS-125) at Edwards Air Force Base in California.
STS-125 Entry flight controllers on console with Flight Director Norman Knight
2009-05-24
JSC2009-E-121511 (24 May 2009) --- Flight controllers in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center watch the big screens during the landing of Space Shuttle Atlantis (STS-125) at Edwards Air Force Base in California.
STS-125 Entry flight controllers on console with Flight Director Norman Knight
2009-05-24
JSC2009-E-121512 (24 May 2009) --- Flight controllers in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center watch the big screens during the landing of Space Shuttle Atlantis (STS-125) at Edwards Air Force Base in California.
STS-125 Entry flight controllers on console with Flight Director Norman Knight
2009-05-24
JSC2009-E-121509 (24 May 2009) --- Flight controllers in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center watch the big screens during the landing of Space Shuttle Atlantis (STS-125) at Edwards Air Force Base in California.
2005-02-28
JSC2001-E-25411 (17 August 2001) --- Astronaut Joan E. Higginbotham, ISS spacecraft communicator (CAPCOM), inputs data into her computer at her console in the station flight control room (BFCR) in Houston's Mission Control Center (MCC) during the STS-105 mission.
Human performance measuring device
NASA Technical Reports Server (NTRS)
Michael, J.; Scow, J.
1970-01-01
Complex coordinator, consisting of operator control console, recorder, subject display panel, and limb controls, measures human performance by testing perceptual and motor skills. Device measures psychophysiological functions in drug and environmental studies, and is applicable to early detection of psychophysiological body changes.
The Electronic Documentation Project in the NASA mission control center environment
NASA Technical Reports Server (NTRS)
Wang, Lui; Leigh, Albert
1994-01-01
NASA's space programs like many other technical programs of its magnitude is supported by a large volume of technical documents. These documents are not only diverse but also abundant. Management, maintenance, and retrieval of these documents is a challenging problem by itself; but, relating and cross-referencing this wealth of information when it is all on a medium of paper is an even greater challenge. The Electronic Documentation Project (EDP) is to provide an electronic system capable of developing, distributing and controlling changes for crew/ground controller procedures and related documents. There are two primary motives for the solution. The first motive is to reduce the cost of maintaining the current paper based method of operations by replacing paper documents with electronic information storage and retrieval. And, the other is to improve the efficiency and provide enhanced flexibility in document usage. Initially, the current paper based system will be faithfully reproduced in an electronic format to be used in the document viewing system. In addition, this metaphor will have hypertext extensions. Hypertext features support basic functions such as full text searches, key word searches, data retrieval, and traversal between nodes of information as well as speeding up the data access rate. They enable related but separate documents to have relationships, and allow the user to explore information naturally through non-linear link traversals. The basic operational requirements of the document viewing system are to: provide an electronic corollary to the current method of paper based document usage; supplement and ultimately replace paper-based documents; maintain focused toward control center operations such as Flight Data File, Flight Rules and Console Handbook viewing; and be available NASA wide.
Astronauts Hoffman and Musgrave monitor Neutral Buoyancy Simulator training
1993-06-15
Astronauts Jeffrey A. Hoffman (far left) and F. Story Musgrave (second left) monitor a training session from consoles in the control room for the Neutral Buoyancy Simulator (NBS) at the Marshall Space Flight Center (MSFC). Seen underwater in the NBS on the big screen and the monitors at the consoles is astronaut Thomas D. Akers. The three mission specialists, along with astronaut Kathryn C. Thornton, are scheduled to be involved in a total of five sessions of extravehicular activity (EVA) to service the Hubble Space Telescope (HST) in orbit during the STS-61 mission, scheduled for December 1993.
Using the Wiimote in Introductory Physics Experiments
NASA Astrophysics Data System (ADS)
Ochoa, Romulo; Rooney, Frank G.; Somers, William J.
2011-01-01
The Wii is a very popular gaming console. An important component of its appeal is the ease of use of its remote controller, popularly known as a Wiimote. This simple-looking but powerful device has a three-axis accelerometer and communicates with the console via Bluetooth protocol. We present two experiments that demonstrate the feasibility of using the Wiimote in introductory physics experiments. The linear dependence of centripetal acceleration on the radial distance at constant angular velocity is verified and compared with data obtained using photogate timers. A second application to simple harmonic oscillators tests the capabilities of the Wiimote to measure variable accelerations.
LOFT. Interior, control room in control building (TAN630). Camera facing ...
LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
2010-12-17
CAPE CANAVERAL, Fla. -- Shuttle Launch Director Mike Leinbach monitors space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants from his console in the Launch Control Center at NASA's Kennedy Space Center in Florida. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
A prototype molecular interactive collaborative environment (MICE).
Bourne, P; Gribskov, M; Johnson, G; Moreland, J; Wavra, S; Weissig, H
1998-01-01
Illustrations of macromolecular structure in the scientific literature contain a high level of semantic content through which the authors convey, among other features, the biological function of that macromolecule. We refer to these illustrations as molecular scenes. Such scenes, if available electronically, are not readily accessible for further interactive interrogation. The basic PDB format does not retain features of the scene; formats like PostScript retain the scene but are not interactive; and the many formats used by individual graphics programs, while capable of reproducing the scene, are neither interchangeable nor can they be stored in a database and queried for features of the scene. MICE defines a Molecular Scene Description Language (MSDL) which allows scenes to be stored in a relational database (a molecular scene gallery) and queried. Scenes retrieved from the gallery are rendered in Virtual Reality Modeling Language (VRML) and currently displayed in WebView, a VRML browser modified to support the Virtual Reality Behavior System (VRBS) protocol. VRBS provides communication between multiple client browsers, each capable of manipulating the scene. This level of collaboration works well over standard Internet connections and holds promise for collaborative research at a distance and distance learning. Further, via VRBS, the VRML world can be used as a visual cue to trigger an application such as a remote MEME search. MICE is very much work in progress. Current work seeks to replace WebView with Netscape, Cosmoplayer, a standard VRML plug-in, and a Java-based console. The console consists of a generic kernel suitable for multiple collaborative applications and additional application-specific controls. Further details of the MICE project are available at http:/(/)mice.sdsc.edu.
Development and evaluation of a radar air traffic control research task.
DOT National Transportation Integrated Search
1965-12-01
A system is described in which various elements of the radar air traffic controller's task can be presented repeatedly, reliably, and concurrently to each of six experimental subjects seated at separate task consoles. Programming of display condition...
30. Perimeter acquisition radar building room #318, showing radar control. ...
30. Perimeter acquisition radar building room #318, showing radar control. Console and line printers - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
2011-04-25
51G-S-219 (June 1985) --- Public Affairs Office (PAO) commentator Janet K. Ross is pictured at her console in the Mission Operations Control Room (MOCR) in the Mission Control Center at NASA's Johnson Space Center during the STS-51G mission. Photo credit: NASA
2011-04-25
51G-S-213 (June 1985) --- Public Affairs Office (PAO) commentator Janet K. Ross is pictured at her console in the Mission Operations Control Room (MOCR) in the Mission Control Center at NASA's Johnson Space Center during the STS-51G mission. Photo credit: NASA
Completion of Launch Director Console Project and Other Support Work
NASA Technical Reports Server (NTRS)
Steinrock, Joshua G.
2018-01-01
There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.
NASA Technical Reports Server (NTRS)
Aguilar, R.
2006-01-01
Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.
2014-04-03
CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
147. ARAIII Control building (ARA607) Detail of instrument rack and ...
147. ARA-III Control building (ARA-607) Detail of instrument rack and control console in control room. Aerojet-general 880-area/GCRE-607-E-4. Date: November 1958. Ineel index code no. 063-0607-10-013-102560. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
ONAV - An Expert System for the Space Shuttle Mission Control Center
NASA Technical Reports Server (NTRS)
Mills, Malise; Wang, Lui
1992-01-01
The ONAV (Onboard Navigation) Expert System is being developed as a real-time console assistant to the ONAV flight controller for use in the Mission Control Center at the Johnson Space Center. Currently, Oct. 1991, the entry and ascent systems have been certified for use on console as support tools, and were used for STS-48. The rendezvous system is in verification with the goal to have the system certified for STS-49, Intelsat retrieval. To arrive at this stage, from a prototype to real-world application, the ONAV project has had to deal with not only Al issues but operating environment issues. The Al issues included the maturity of Al languages and the debugging tools, verification, and availability, stability and size of the expert pool. The environmental issues included real time data acquisition, hardware suitability, and how to achieve acceptance by users and management.
A Data-Based Console Logger for Mission Operations Team Coordination
NASA Technical Reports Server (NTRS)
Thronesbery, Carroll; Malin, Jane T.; Jenks, Kenneth; Overland, David; Oliver, Patrick; Zhang, Jiajie; Gong, Yang; Zhang, Tao
2005-01-01
Concepts and prototypes1,2 are discussed for a data-based console logger (D-Logger) to meet new challenges for coordination among flight controllers arising from new exploration mission concepts. The challenges include communication delays, increased crew autonomy, multiple concurrent missions, reduced-size flight support teams that include multidisciplinary flight controllers during quiescent periods, and migrating some flight support activities to flight controller offices. A spiral development approach has been adopted, making simple, but useful functions available early and adding more extensive support later. Evaluations have guided the development of the D-Logger from the beginning and continue to provide valuable user influence about upcoming requirements. D-Logger is part of a suite of tools designed to support future operations personnel and crew. While these tools can be used independently, when used together, they provide yet another level of support by interacting with one another. Recommendations are offered for the development of similar projects.
STS-134 Flight Controllers on Console - Landing
2011-06-01
JSC2011-E-050168 (1 June 2011) --- An overall view of the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center photographed during STS-134/ULF-6 landing day activities. Flight directors Richard Jones (left) and Tony Ceccacci are visible in the foreground. Photo credit: NASA
Mission control activity during STS-61 EVA
1993-12-07
Flight controller Susan P. Rainwater observes as two astronauts work through a lengthy period of extravehicular activity (EVA) in the cargo bay of the Earth-looking Space Shuttle Endeavour. Rainwater's EVA console was one of Mission Control's busiest during this eleven-day Hubble Space Telescope (HST) servicing mission in Earth orbit.
Neil, A; Ens, S; Pelletier, R; Jarus, T; Rand, D
2013-02-01
Virtual reality (VR) is an emerging trend in stroke rehabilitation. VR gaming consoles in stroke intervention have been shown to increase motivation and enjoyment during exercise. The amount and intensity of movements elicited using these consoles are unknown. The aims of this study were: (1) to quantify the amount and intensity of movement elicited from both hands of two groups of individuals ([chronic stroke and without a disability [healthy]); (2) to determine the effect of console (Wii/EyeToy) and group (stroke/healthy) on the amount and intensity of upper extremity movement; (3) to determine the effect of console (Wii/EyeToy) and group (stroke/healthy) on the usability and VR experience. A cross-sectional design was taken. Outpatient rehabilitation setting and healthy participant's homes. Participants included ten adults with stroke and ten adults without a disability. Participants experienced two games from each console. Amount and intensity of movement was measured using accelerometers on both wrists, while the virtual experience and usability was determined with questionnaires. No significant differences were found between the consoles usability and experience. EyeToy elicited significantly greater activity count than Wii among the healthy participants (P=0.028) and significantly greater movement intensity in both the stroke (P=0.005) and healthy (P=0.005) groups. Both consoles rated high for usability, enjoyment and satisfaction highlighting their suitability for a range of individuals in stroke rehabilitation. EyeToy provides increased movement and movement intensity. Both consoles are suitable for use in stroke rehabilitation however this information can be helpful to clinicians while selecting a gaming console according to the type and intensity of movements that he/she aims to encourage during therapy.
Maddison, Ralph; Mhurchu, Cliona Ni; Jull, Andrew; Jiang, Yannan; Prapavessis, Harry; Rodgers, Anthony
2007-08-01
This study sought to quantify the energy expenditure and physical activity associated with playing the "new generation" active and nonactive console-based video games in 21 children ages 10-14 years. Energy expenditure (kcal) derived from oxygen consumption (VO2) was continuously assessed while children played nonactive and active console video games. Physical activity was assessed continuously using the Actigraph accelerometer. Significant (p < .001) increases from baseline were found for energy expenditure (129-400%), heart rate (43-84%), and activity counts (122-1288 versus 0-23) when playing the active console video games. Playing active console video games over short periods of time is similar in intensity to light to moderate traditional physical activities such as walking, skipping, and jogging.
The design of the m-health service application using a Nintendo DS game console.
Lee, Sangjoon; Kim, Jungkuk; Lee, Myoungho
2011-03-01
In this article, we developed an m-health monitoring system using a Nintendo DS game console to demonstrate its utility. The proposed system consists of a biosignal acquisition device, wireless sensor network, base-station for signal reception from the sensor network and signal conversion according to Internet protocol, personal computer display program, and the Nintendo DS game console. The system collects three-channel electrocardiogram (ECG) signals for cardiac abnormality detection and three-axis accelerometer signals for fall detection of a person. The collected signals are then transmitted to the base-station through the wireless sensor network, where they are transformed according to the transmission control protocol/Internet protocol (TCP/IP) and sent to the destination IP through Internet network. To test the developed system, the collected signals were displayed on a computer located in different building through wired Internet network and also simultaneously displayed on the Nintendo DS game console connected to Internet network wirelessly. The system was able to collect and transmit signals for more than 24 h without any interruptions or malfunctions, showing the possibility of integrating healthcare monitoring functions into a small handheld-type electronic device developed for different purposes without significant complications. It is expected that the system can be used in an ambulance, nursing home, or general hospital where efficient patient monitoring from long distance is necessary.
1964-10-14
This photograph, dated October 14, 1964, was taken at the Marned Spacecraft Center, now the Johnson Space Center in Houston, Texas. Dr. von Braun is shown looking over consoles in the Manned Spaceflight Control Center.
1969-07-16
CAPE CANAVERAL, Fla. – Members of the Kennedy Space Center government-industry team rise from their consoles within the Launch Control Center to watch the Apollo 11 liftoff through a window. Photo credit: NASA
Eugene F. Kranz wears special vest to celebrate 41-C mission landing
NASA Technical Reports Server (NTRS)
1984-01-01
Eugene F. Kranz, Director of Mission Operations, wears special red, white and blue striped vest to celebrate 41-C mission landing. He stands at the rear row of consoles in the Mission Operations Control Room (MOCR) of JSC's Mission Control Center.
Control Room at the NACA’s Rocket Engine Test Facility
1957-05-21
Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.
21 CFR 872.1745 - Laser fluorescence caries detection device.
Code of Federal Regulations, 2011 CFR
2011-04-01
... SERVICES (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Diagnostic Devices § 872.1745 Laser fluorescence caries... fluorescence detector housed in a dental handpiece, and a control console that performs device calibration, as...
21 CFR 872.1745 - Laser fluorescence caries detection device.
Code of Federal Regulations, 2014 CFR
2014-04-01
... SERVICES (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Diagnostic Devices § 872.1745 Laser fluorescence caries... fluorescence detector housed in a dental handpiece, and a control console that performs device calibration, as...
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
WILLIAMS, CLIFTON C. ASTRONAUT - MISSION CONTROL CENTER (MCC) - GEMINI-TITAN (GT)-3 - MSC
1965-03-23
S65-18063 (23 March 1965) --- Astronaut Clifton C. Williams is shown at console in the Mission Control Center (MCC) in Houston, Texas during the Gemini-Titan 3 flight. The GT-3 flight was monitored by the MCC in Houston, but was controlled by the MCC at Cape Kennedy.
Proceedings of the Fourth Annual Workshop on the Use of Digital Computers in Process Control.
ERIC Educational Resources Information Center
Smith, Cecil L., Ed.
Contents: Computer hardware testing (results of vendor-user interaction); CODIL (a new language for process control programing); the design and implementation of control systems utilizing CRT display consoles; the systems contractor - valuable professional or unnecessary middle man; power station digital computer applications; from inspiration to…
Documentation of White Flight Control Room (WFCR), Building 30 during STS-109.
2002-03-07
JSC2002-E-08460 (7 March 2002) --- Flight directors Jeff Hanley (standing) and Bryan P. Austin watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houston;s Mission Control Center (MCC) during the STS-109 Hubble Space Telescope (HST) servicing mission.
LPT. Low power test control building (TAN641) interior. Camera facing ...
LPT. Low power test control building (TAN-641) interior. Camera facing northeast at what remains of control room console. Cut in wall at right of view shows west wall of northern test cell. INEEL negative no. HD-40-4-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
1982-05-06
access 99 6.3.2 Input/output interrupt code 99 register (IOIC) 6.3.2.1 Read input/output interrupt 100 code, level 1 (OAOOOH) 6.3.2.2 Read input...output interrupt 100 code, level 2 (OA001H) 6.3.3 Console input/output 100 6.3.3.1 Clear console (4001H) 100 6.3.3.2 Console output (4000H) 100 6.3.3.3...Console input (COOOH) 100 6.3.3.4 Read console status (C0O01H) 100 6.3.4 Memory fault status register (MFSR) 100 6.3.4.1 Read memory fault register
"It could have been worse": Developmental change in the use of a counterfactual consoling strategy.
Payir, Ayse; Guttentag, Robert
2016-08-01
In two experiments, we investigated developmental change in the use of a counterfactual consoling strategy: "it could have been worse." In Experiment 1, 8-year-olds, 10-year-olds, 12-year-olds, and adults were presented with two stories in which a character feels bad as the result of an event that could have turned out better or could have turned out worse. Participants were asked what they would say or do to make the characters feel better. The results revealed that the frequency with which participants mentioned a counterfactual consoling strategy increased dramatically with age. In Experiment 2, using the same stories with similar-aged participants, we tested whether providing children with several consoling strategies (rather than asking them to create one) would prompt greater use of a counterfactual consoling strategy. Under these conditions, the 10- and 12-year-olds responded in a manner very similar to that of adults, whereas the 8-year-olds selected a counterfactual consoling strategy less often than participants at any other age. The findings from the two experiments suggest that, up through at least age 12years, children are less likely than adults to spontaneously apply counterfactual thinking when generating a consoling strategy. Copyright © 2016 Elsevier Inc. All rights reserved.
McClanachan, Nelson J; Gesch, Janelle; Wuthapanich, Nampech; Fleming, Jennifer; Kuys, Suzanne S
2013-01-01
To determine feasibility of gaming console exercise and its effect on endurance, gait and balance in people following acquired brain injury (ABI). Twenty-one people following ABI were recruited to an 8-week randomized cross-over trial where 4 weeks of gaming console exercise in addition to usual therapy and 4 weeks of usual therapy alone were received. Feasibility measures included compliance, session duration and adverse events. Measures included endurance measured using a 6-minute walk test, spatiotemporal gait parameters (GAITRite) and balance using Balance Outcome Measure for Elder Rehabilitation (BOOMER). Motivation was measured using the Change Assessment Questionnaire. Compliance with gaming console exercise was high (99%), the majority of sessions reached duration target (82%) and there were no adverse events. There were small, though non-significant increases in 6-minute walk distance (18 metres, 95% CI = -33 to 69), gait speed (0.11 m s(-1), 95% CI = -0.18 to 0.29) and balance compared to after usual therapy after gaming console exercise. Gaming console exercise appears feasible in people with ABI. Four weeks of gaming console exercise in addition to usual therapy appears to result in similar improvements in endurance, gait and balance compared to usual therapy alone and may enhance active engagement in therapy.
SpaceOps 2012 Plus 2: Social Tools to Simplify ISS Flight Control Communications and Log Keeping
NASA Technical Reports Server (NTRS)
Cowart, Hugh S.; Scott, David W.
2014-01-01
A paper written for the SpaceOps 2012 Conference (Simplify ISS Flight Control Communications and Log Keeping via Social Tools and Techniques) identified three innovative concepts for real time flight control communications tools based on social mechanisms: a) Console Log Tool (CoLT) - A log keeping application at Marshall Space Flight Center's (MSFC) Payload Operations Integration Center (POIC) that provides "anywhere" access, comment and notifications features similar to those found in Social Networking Systems (SNS), b) Cross-Log Communication via Social Techniques - A concept from Johnsson Space Center's (JSC) Mission Control Center Houston (MCC-H) that would use microblogging's @tag and #tag protocols to make information/requests visible and/or discoverable in logs owned by @Destination addressees, and c) Communications Dashboard (CommDash) - A MSFC concept for a Facebook-like interface to visually integrate and manage basic console log content, text chat streams analogous to voice loops, text chat streams dedicated to particular conversations, generic and position-specific status displays/streams, and a graphically based hailing display. CoLT was deployed operationally at nearly the same time as SpaceOps 2012, the Cross- Log Communications idea is currently waiting for a champion to carry it forward, and CommDash was approved as a NASA Iinformation Technoloby (IT) Labs project. This paper discusses lessons learned from two years of actual CoLT operations, updates CommDash prototype development status, and discusses potential for using Cross-Log Communications in both MCC-H and/or POIC environments, and considers other ways for synergizing console applcations.
21 CFR 872.1745 - Laser fluorescence caries detection device.
Code of Federal Regulations, 2013 CFR
2013-04-01
... fluorescence detector housed in a dental handpiece, and a control console that performs device calibration, as...) Properly sterilize the emitter-detector handpick before each use, and (iv) Properly maintain and handle the...
21 CFR 872.1745 - Laser fluorescence caries detection device.
Code of Federal Regulations, 2012 CFR
2012-04-01
... fluorescence detector housed in a dental handpiece, and a control console that performs device calibration, as...) Properly sterilize the emitter-detector handpick before each use, and (iv) Properly maintain and handle the...
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Mission Operations Control Room Activities during STS-2 mission
NASA Technical Reports Server (NTRS)
1981-01-01
Mission Operations Control Room (MOCR) activities during STS-2 mission. President Ronald Reagan is briefed by Dr. Christopher C. Kraft, Jr., JSC Director, who points toward the orbiter spotter on the projection plotter at the front of the MOCR (39499); President Reagan joking with STS-2 astronauts during space to ground conversation (39500); Mission Specialist/Astronaut Sally K. Ride communicates with the STS-2 crew from the spacecraft communicator console (39501); Charles R. Lewis, bronze team Flight Director, monitors activity from the STS-2 crew. He is seated at the flight director console in MOCR (39502); Eugene F. Kranz, Deputy Director of Flight Operations at JSC answers a question during a press conference on Nov. 13, 1981. He is flanked by Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC; and Dr. Christopher C. Kraft, Jr., Director of JSC (39503).
Semans, Joseph P.; Johnson, Peter G.; LeBoeuf, Jr., Robert F.; Kromka, Joseph A.; Goron, Ronald H.; Hay, George D.
1993-01-01
A trainer, mounted and housed within a mobile console, is used to teach and reinforce fluid principles to students. The system trainer has two centrifugal pumps, each driven by a corresponding two-speed electric motor. The motors are controlled by motor controllers for operating the pumps to circulate the fluid stored within a supply tank through a closed system. The pumps may be connected in series or in parallel. A number of valves are also included within the system to effect different flow paths for the fluid. In addition, temperature and pressure sensing instruments are installed throughout the closed system for measuring the characteristics of the fluid, as it passes through the different valves and pumps. These measurements are indicated on a front panel mounted to the console, as a teaching aid, to allow the students to observe the characteristics of the system.
Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks
NASA Technical Reports Server (NTRS)
Anderson, Mark G.
2011-01-01
This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.
2001-07-16
JSC2001-E-21559 (13 July 2001) --- Astronauts Mark L. Polansky (left) and Steven G. MacLean of the Canadian Space Agency (CSA) look over information regarding the STS-104 mission at the spacecraft communicator (CAPCOM) console in the shuttle flight control room (WFCR) in Houston's Mission Control Center (MCC).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
... Entertainment Consoles, Related Software, and Components Thereof; Notice of Investigation AGENCY: U.S..., related software, and components thereof by reason of infringement of certain claims of U.S. Patent No. 5... gaming and entertainment consoles, related software, and components thereof that infringe one or more of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Canfield, K.J.
1984-05-01
An EMCS (Energy Monitoring and Control System) can be described as a system that automatically takes care of routine operation of equipment and provides centralized reporting and override capabilities. Equipment controlled by an EMCS would be heating, ventilating, and air conditioning (HVAC) equipment, air compressors, and small package boiler units. The EMCS would obtain raw information (data) from sensors associated with the equipment and massage the data into useful information. The information obtained from the sensors plus additional information available to the EMCS would be used to control the equipment. The information would also be available to the operator inmore » the form of reports or in response to operator commands for specific information. EMCS are computerized systems that control and monitor energy consuming and producing equipment at Naval facilities. The larger systems have been installed with color-graphics cathode ray tube operator consoles to provide better information to the personnel operating these systems. This report summarizes the work done on defining an adequate operator console and recommends changes to the existing EMCS Guide Specifications.« less
Low-Cost Accelerometers for Physics Experiments
ERIC Educational Resources Information Center
Vannoni, Maurizio; Straulino, Samuele
2007-01-01
The implementation of a modern game-console controller as a data acquisition interface for physics experiments is discussed. The investigated controller is equipped with three perpendicular accelerometers and a built-in infrared camera to evaluate its own relative position. A pendulum experiment is realized as a demonstration of the proposed…
STS-102 Launch Activities inside the MCC.
2001-03-08
JSC2001-E-06208 (8 March 2001) --- At his console in Houston's Mission Control Center, ascent flight director Wayne Hale monitors Discovery's pre-launch activities several hundred miles away in Florida on STS-102 launch day.
10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2010 CFR
2010-01-01
... on the remote afterloader unit, on the control console, and in the facility; (3) Viewing and intercom... monitors used to indicate room exposures; (6) Source positioning (accuracy); and (7) Radiation monitors...
... is performed with the help of a surgical robot. Essentially, the surgical robot allows surgeons to perform videoscopic surgery with even ... surgeons use specialized instruments attached to the surgical robot. Surgeons sit at a console and control the ...
Mission Operations Control Room (MOCR) activities during STS-6 mission
1983-04-05
Astronauts Roy D. Bridges (left) and RIchard O. Covey serve as spacecraft communicators (CAPCOM) for STS-6. They are seated at the CAPCOM console in the mission operations control room (MOCR) of JSC's mission control center (30119); Flight Director Jay H. Greene communicates with a nearby flight controller in the MOCR just after launch of the Challenger (30120).
[Efficacy of interventions with video games consoles in stroke patients: a systematic review].
Ortiz-Huerta, J H; Perez-de-Heredia-Torres, M; Guijo-Blanco, V; Santamaria-Vazquez, M
2018-01-16
In recent years video games and games consoles have been developed that are potentially useful in rehabilitation, which has led to studies conducted to evaluate the degree of efficacy of these treatments for people following a stroke. To analyse the literature available related to the effectiveness of applying video games consoles in the functional recovery of the upper extremities in subjects who have survived a stroke. A review of the literature was conducted in the CINHAL, Medline, PEDro, PsycArticles, PsycInfo, Science Direct, Scopus and Web of Science databases, using the query terms 'video game', 'stroke', 'hemiplegia', 'upper extremity' and 'hemiparesis'. After applying the eligibility criteria (clinical trials published between 2007 and 2017, whose participants were adults who had suffered a stroke with involvement of the upper extremity and who used video games), the scientific quality of the selected studies was rated by means of the PEDro scale. Eleven valid clinical trials were obtained for the systematic review. The studies that were selected, all of which were quantitative, presented different data and the inferential results indicated different levels of significance between control and experimental groups (82%) or between the different types of treatment (18%). The use of video games consoles is a useful complement for the conventional rehabilitation of the upper extremities of persons who have survived a stroke, since it increases rehabilitation time and enhances the recovery of motor functioning. Nevertheless, homogeneous intervention protocols need to be implemented in order to standardise the intervention.
STS-26 simulation activities in JSC Mission Control Center (MCC)
NASA Technical Reports Server (NTRS)
1987-01-01
In JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR), flight directors (FDs) Lee Briscoe (left) and Charles W. Shaw, seated at FD console, view front visual display monitors during STS-26 simulations in progress between MCC and JSC Mission Simulation and Training Facility Bldg 5 fixed-base (FB) shuttle mission simulator (SMS).
Audio Control Handbook For Radio and Television Broadcasting. Third Revised Edition.
ERIC Educational Resources Information Center
Oringel, Robert S.
Audio control is the operation of all the types of sound equipment found in the studios and control rooms of a radio or television station. Written in a nontechnical style for beginners, the book explains thoroughly the operation of all types of audio equipment. Diagrams and photographs of commercial consoles, microphones, turntables, and tape…
Views of the mission control center during STS-9
NASA Technical Reports Server (NTRS)
1983-01-01
The two backup payload specialists for Drs. Byron K. Lichtenberg and Ulf Merbold huddle in the mission control center during day three activity aboard Spacelab. Seated at the Console is Dr. Michael Lampton. Leaning over Lampton's shoulder is Dutch scientist Wubbo Ockels. The two are surrounded by a few of the flight controllers in the payload operations control center (POCC) portion of JSC's mission control center.
Mitre, Naim; Foster, Randal C; Lanningham-Foster, Lorraine; Levine, James A
2011-01-01
In the present study we investigated the effect of television watching and the use of activity-promoting video games on energy expenditure in obese and lean children. Energy expenditure and physical activity were measured while participants were watching television, playing a video game on a traditional sedentary video game console, and while playing the same video game on an activity-promoting video game console. Energy expenditure was significantly greater than television watching and playing video games on a sedentary video game console when children played the video game on the activity-promoting console. When examining movement with accelerometry, children moved significantly more when playing the video game on the Nintendo Wii console. Activity-promoting video games have shown to increase movement, and be an important tool to raise energy expenditure by 50% when compared to sedentary activities of daily living.
The amount of consolation compensation in road traffic accidents.
Jou, Rong-Chang
2014-06-01
This study aimed to investigate the amount of consolation compensation that road accident perpetrators were willing to pay victims. It used 2010 statistics for general road accidents from Taiwan's National Police Agency (NPA) for further sampling and to mail questionnaires. In investigating consolation compensation, the framework of the contingent valuation method was used, and the data were collected through the design of different scenarios. In this study, five injury levels were designed to further analyse the consolation compensation price the perpetrators were willing to pay: minor injury, moderate injury, serious injury, disability, and death. The results revealed the price that many perpetrators were willing to pay was zero; however, we overcame this issue by using the Spike model. The estimated results showed that road accident perpetrators were willing to pay more consolation compensation with increased injury severity. Copyright © 2014 Elsevier Ltd. All rights reserved.
Design and testing of a 750MHz CW-EPR digital console for small animal imaging.
Sato-Akaba, Hideo; Emoto, Miho C; Hirata, Hiroshi; Fujii, Hirotada G
2017-11-01
This paper describes the development of a digital console for three-dimensional (3D) continuous wave electron paramagnetic resonance (CW-EPR) imaging of a small animal to improve the signal-to-noise ratio and lower the cost of the EPR imaging system. A RF generation board, an RF acquisition board and a digital signal processing (DSP) & control board were built for the digital EPR detection. Direct sampling of the reflected RF signal from a resonator (approximately 750MHz), which contains the EPR signal, was carried out using a band-pass subsampling method. A direct automatic control system to reduce the reflection from the resonator was proposed and implemented in the digital EPR detection scheme. All DSP tasks were carried out in field programmable gate array ICs. In vivo 3D imaging of nitroxyl radicals in a mouse's head was successfully performed. Copyright © 2017 Elsevier Inc. All rights reserved.
2012-05-11
CAPE CANAVERAL, Fla. – United Space Alliance test conductors monitor the Firing Room 4 Master Console in the Launch Control Center as operations to power down space shuttle Endeavour for the final time are under way in Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida. From left are Dave Martin, Gary Lewis, Ethan Waldron, and John Robb. The overall health and status of the shuttle’s Launch Processing System is overseen and controlled from the Master Console. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Tim Jacobs
Design and testing of a 750 MHz CW-EPR digital console for small animal imaging
NASA Astrophysics Data System (ADS)
Sato-Akaba, Hideo; Emoto, Miho C.; Hirata, Hiroshi; Fujii, Hirotada G.
2017-11-01
This paper describes the development of a digital console for three-dimensional (3D) continuous wave electron paramagnetic resonance (CW-EPR) imaging of a small animal to improve the signal-to-noise ratio and lower the cost of the EPR imaging system. A RF generation board, an RF acquisition board and a digital signal processing (DSP) & control board were built for the digital EPR detection. Direct sampling of the reflected RF signal from a resonator (approximately 750 MHz), which contains the EPR signal, was carried out using a band-pass subsampling method. A direct automatic control system to reduce the reflection from the resonator was proposed and implemented in the digital EPR detection scheme. All DSP tasks were carried out in field programmable gate array ICs. In vivo 3D imaging of nitroxyl radicals in a mouse's head was successfully performed.
ERIC Educational Resources Information Center
Groff, Jennifer S.; Howells, Cathrin; Cranmer, Sue
2012-01-01
The main focus of this research project was to identify the educational benefits of console game-based learning in primary and secondary schools. The project also sought to understand how the benefits of educational gaming could transfer to other settings. For this purpose, research was carried out in classrooms in Scotland to explore learning…
Co-Evolution of Mobile Language Learning: Going Global with Games Consoles in Higher Education
ERIC Educational Resources Information Center
Hemmi, Akiko; Narumi-Munro, Fumiko; Alexander, Wilma; Parker, Helen; Yamauchi, Yoko
2014-01-01
Game consoles have been adopted as a learning platform in school education. However, there is a scarcity of studies examining the utility of games consoles with built-in WiFi as affordable learning platforms in universities. This paper contributes to knowledge about the capacity of the Nintendo DSi to create new learning spaces mediated and…
Dr. Gilruth and Dr. Kraft - Mission Control Center (MCC) - Apollo V Launch - MSC
1968-01-22
S68-18733 (22 Jan. 1968) --- Dr. Robert R. Gilruth (right), MSC Director, sits with Dr. Christopher C. Kraft Jr., MSC director of flight operations, at his flight operations director console in the Mission Control Center, Building 30, during the Apollo 5 (LM-1/Saturn 204) unmanned space mission.
View of Mission Control Center during the Apollo 13 liftoff
1970-04-11
S70-34627 (11 April 1970) --- Sigurd A. Sjoberg, director of flight operations, at the Manned Spacecraft Center (MSC), views the Apollo 13 liftoff from a console in the MSC Mission Control Center (MCC), Building 30. Apollo 13 lifted off at 1:13 p.m. (CST) April 11, 1970. Photo credit: NASA
2010-04-05
JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraft communicator (CAPCOM) for the STS-131 mission, is pictured at his console in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Discovery's STS-131 launch.
Credit PSR. Interior view shows the building equipment room as ...
Credit PSR. Interior view shows the building equipment room as seen looking south southwest (206°) from the doorway. The control console contains switches for chiller pumps, fans, heaters, temperature controls, and alarms - Jet Propulsion Laboratory Edwards Facility, Solid Propellant Conditioning Building, Edwards Air Force Base, Boron, Kern County, CA
Mixing console design for telematic applications in live performance and remote recording
NASA Astrophysics Data System (ADS)
Samson, David J.
The development of a telematic mixing console addresses audio engineers' need for a fully integrated system architecture that improves efficiency and control for applications such as distributed performance and remote recording. Current systems used in state of the art telematic performance rely on software-based interconnections with complex routing schemes that offer minimal flexibility or control over key parameters needed to achieve a professional workflow. The lack of hardware-based control in the current model limits the full potential of both the engineer and the system. The new architecture provides a full-featured platform that, alongside customary features, integrates (1) surround panning capability for motorized, binaural manikin heads, as well as all sources in the included auralization module, (2) self-labelling channel strips, responsive to change at all remote sites, (3) onboard roundtrip latency monitoring, (4) synchronized remote audio recording and monitoring, and (5) flexible routing. These features combined with robust parameter automation and precise analog control will raise the standard for telematic systems as well as advance the development of networked audio systems for both research and professional audio markets.
LCS Master Console Event Message Reduction
NASA Technical Reports Server (NTRS)
Nguyen, Uyen
2014-01-01
System monitoring and control (SMC) message browsers receive so many messages daily that operators are unable to keep track all of them. Important messages are often mixed up among the less important ones. My job is to reduce the messages so that warning and emergency messages can be seen easily and therefore, responded promptly. There are multiple methods to achieve this. Firstly, messages that look the same should not appear many times in the message browser. Instead, the message should appear only once but with a number that counts the times that it appears. This method is called duplicate message suppression. Messages that display "normal" or "advisory" alarm level should be suppressed. Secondly, messages that update the most recent status of a system should replace the old-status messages. This method is called state based message correlation. Thirdly, some unnecessary messages should be sent straight to history after being displayed or not displayed at all. For an example, normal messages that are not a response to an operator's action should not be displayed. I also work on fixing messages that are not color-coded and formatted properly.
NASA Technical Reports Server (NTRS)
Parker, J. F., Jr.; Duffy, J. W.
1982-01-01
Key problems in single pilot instrument flight operations are in the management of flight data and the processing of cockpit information during conditions of heavy workload. A flight data console was developed to allow simulation of a digital data link to replace the current voice communications stem used in air traffic control. This is a human factors evaluation of a data link communications system to determine how such a system might reduce cockpit workload, improve flight proficiency, and be accepted by general aviation pilots. The need for a voice channel as backup to a digital link is examined. The evaluations cover both airport terminal area operations and full mission instrument flight. Results show that general aviation pilots operate well with a digital data link communications system. The findings indicate that a data link system for pilot/ATC communications, with a backup voice channel, is well accepted by general aviation pilots and is considered to be safer, more efficient, and result in less workload than the current voice system.
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From left, are NASA Commentator Allard Beutel, Discovery's NASA Vehicle Manager Jennifer Nufer and Lead NASA Test Director Charlie Blackwell-Thompson. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From back, are STS-133 Assistant NASA Test Director Jeff Spaulding, STS-133 NASA Test Director Steve Payne and Launch Orbiter Test Conductor John Kracsun. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From back, are STS-133 Assistant NASA Test Director Jeff Spaulding, STS-133 NASA Test Director Steve Payne, Launch Orbiter Test Conductor John Kracsun and Assistant Launch Orbiter Test Conductor Mark Taffet. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From left, are STS-133 Assistant NASA Test Director Jeff Spaulding, NASA Test Director Jeremy Graeber and STS-133 NASA Test Director Steve Payne. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
Huang, Wei Pin; Wang, Chia Cheng; Hung, Jo Hua; Chien, Kai Chun; Liu, Wen-Yu; Cheng, Chih-Hsiu; Ng, How-Hing; Lin, Yang-Hua
2015-02-01
[Purpose] This study aimed to determine the effectiveness of joystick-controlled video console games in enhancing subjects' ability to control power wheelchairs. [Subjects and Methods] Twenty healthy young adults without prior experience of driving power wheelchairs were recruited. Four commercially available video games were used as training programs to practice joystick control in catching falling objects, crossing a river, tracing the route while floating on a river, and navigating through a garden maze. An indoor power wheelchair driving test, including straight lines, and right and left turns, was completed before and after the video game practice, during which electromyographic signals of the upper limbs were recorded. The paired t-test was used to compare the differences in driving performance and muscle activities before and after the intervention. [Results] Following the video game intervention, participants took significantly less time to complete the course, with less lateral deviation when turning the indoor power wheelchair. However, muscle activation in the upper limbs was not significantly affected. [Conclusion] This study demonstrates the feasibility of using joystick-controlled commercial video games to train individuals in the control of indoor power wheelchairs.
STS-102 Launch Activities inside the MCC.
2001-03-08
JSC2001-E-06204 (8 March 2001) --- At the Spacecraft Communicator (CAPCOM) console in Houston's Mission Control Center, astronauts Christopher J. (Gus) Loria (foreground) and Scott D. Altman monitor Discovery's pre-launch activity several hundred miles away in Florida.
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
2014-03-27
DATE: 3-27-14.LOCATION: Bldg. 30 - FCR-1 (30M/231).SUBJECT: Expedition 39 flight controllers on console with Flight Director Ron Spencer watch the approach of the Soyuz 39 crew docking to the ISS from FCR-1..PHOTOGRAPHER: Lauren Harnett
NASA Technical Reports Server (NTRS)
Gonzalez, F. A.; Waller, M. B.
1974-01-01
Description of a writing console which was used for monitoring handwriting behavior. The main feature of the console is a translucent Plexiglass paddle, pivoted on a thin bronze tube, with its top flat surface providing the writing surface. The console was used in experiments on two subjects under various schedules of monetary reinforcement for handwriting. The results suggest that handwriting is an effective approach to the analysis of human behavior.
Motion sickness and postural sway in console video games.
Stoffregen, Thomas A; Faugloire, Elise; Yoshida, Ken; Flanagan, Moira B; Merhi, Omar
2008-04-01
We tested the hypotheses that (a) participants might develop motion sickness while playing "off-the-shelf" console video games and (b) postural motion would differ between sick and well participants, prior to the onset of motion sickness. There have been many anecdotal reports of motion sickness among people who play console video games (e.g., Xbox, PlayStation). Participants (40 undergraduate students) played a game continuously for up to 50 min while standing or sitting. We varied the distance to the display screen (and, consequently, the visual angle of the display). Across conditions, the incidence of motion sickness ranged from 42% to 56%; incidence did not differ across conditions. During game play, head and torso motion differed between sick and well participants prior to the onset of subjective symptoms of motion sickness. The results indicate that console video games carry a significant risk of motion sickness. Potential applications of this research include changes in the design of console video games and recommendations for how such systems should be used.
2009-09-01
Tele-maintenance Capability with Remote Serial Console Access and Proactive Monitoring of Medical Devices PRINCIPAL INVESTIGATOR...Remote Serial Console Access and Proactive Monitoring of Medical Devices 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...ORGANIZATION REPORT NUMBER Concepteers LLC 880 Bergen Avenue, Suite 403 Jersey City, NJ 07306 9. SPONSORING / MONITORING
Personnel in blue and white FCR bldg 30 during STS-106
2000-09-19
JSC2000-E-22832 (13 September 2000) --- Gary Ford intently watches a monitor at the Assembly and Checkout Officer (ACO) console in Houston's Mission Control Center (MCC). The ACO is responsible for station assembly, activation and checkout operations.
Mission control activity during STS-61 EVA-1
1993-12-05
Joseph Fanelli, at the Integrated Communications Officer console, monitors the televised activity of Astronauts Story Musgrave and Jeffrey A. Hoffman. The vetern astronauts were performing the first extravehicular activity (EVA-1) of the STS-61 Hubble Space Telescope (HST) servicing mission.
STS-102 Launch Activities inside the MCC.
2001-03-08
JSC2001-E-06203 (8 March 2001) --- At his console in Houston's Mission Control Center, astronaut Scott D. Altman, spacecraft communicator (CAPCOM), monitors weather data possibly affecting Discovery's pre-launch activities several hundred miles away in Florida on STS-102 launch day.
Mitre, Naim; Foster, Randal C; Lanningham-Foster, Lorraine; Levine, James A.
2014-01-01
Background Screen time continues to be a major contributing factor to sedentariness in children. There have been more creative approaches to increase physical over the last few years. One approach has been through the use of video games. In the present study we investigated the effect of television watching and the use of activity-promoting video games on energy expenditure and movement in lean and obese children. Our primary hypothesis was that energy expenditure and movement decreases while watching television, in lean and obese children. Our secondary hypothesis was that energy expenditure and movement increases when playing the same game with an activity-promoting video game console compared to a sedentary video game console, in lean and obese children. Methods Eleven boys (10 ± 1 year) and eight girls (9 ± 1 year) ranging in BMI from 14–29 kg/m2 (eleven lean and eight overweight or obese) were recruited. Energy expenditure and physical activity were measured while participants were watching television, playing a video game on a traditional sedentary video game console, and while playing the same video game on an activity-promoting video game (Nintendo Wii) console. Results Energy expenditure was significantly greater than television watching and playing video games on a sedentary video game console when children played the video game on the activity-promoting console(125.3 ± 38.2 Kcal/hr vs. 79.7 ± 20.1 and 79.4 ±15.7, P<0.0001, respectively). When examining movement with accelerometry, children moved significantly more when playing the video game on the Nintendo Wii console (p<0.0001). Conclusion The amount of movement and energy expenditure of television watching and playing video games on a sedentary video game console is not different. Activity-promoting video games have shown to increase movement, and be an important tool to raise energy expenditure by 50% when compared to sedentary activities of daily living. PMID:22145458
ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...
ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Instrumentation and control systems, equipment location; instrumentation and control building, ...
Instrumentation and control systems, equipment location; instrumentation and control building, instrumentation room, bays and console plan. Specifications No. Eng-04-353-55-72; drawing no. 60-09-12; sheet 110 of 148; file no. 1321/61. Stamped: Record drawing - as constructed. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
2010-04-05
JSC2010-E-046772 (5 April 2010) --- Astronauts George Zamka (left) and Rick Sturckow, both spacecraft communicators (CAPCOM) for the STS-131 mission, are pictured at their consoles in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Discovery's STS-131 launch.
Personnel - Gemini-Titan (GT)-10 - Mission Control Center (MCC) - MSC
1966-07-18
S66-43377 (18 July 1966) --- Standing at the flight director's console, viewing the Gemini-10 flight display in the Mission Control Center, are (left to right) William C. Schneider, Mission Director; Glynn Lunney, Prime Flight Director; Christopher C. Kraft Jr., MSC Director of Flight Operations; and Charles W. Mathews, Manager, Gemini Program Office. Photo credit: NASA
33. Perimeter acquisition radar building room #320, perimeter acquisition radar ...
33. Perimeter acquisition radar building room #320, perimeter acquisition radar operations center (PAROC), contains the tactical command and control group equipment required to control the par site. Showing spacetrack monitor console - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
29. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW ...
29. LAUNCH CONTROL CAPSULE. ACOUSTICAL ENCLOSURE WITH MISSILE COMBAT CREW MEMBERS (FRONT TO BACK) LIEUTENANT KEVIN R. MCCLUNEY AND CAPTAIN JAMES L. KING, JR. AT CONSOLES. REFRIGERATOR AT RIGHT FLANKED BY RADIO EQUIPMENT (RIGHT) AND FILE CABINETS (LEFT). VIEW TO SOUTHWEST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, NORTH HALF. CAMERA IS ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, NORTH HALF. CAMERA IS NEAR NORTHWEST CORNER AND FACING SOUTH ALONG WEST CORRIDOR. STORAGE CANAL IS ALONG LEFT OF VIEW; PERIMETER WALL, ALONG RIGHT. CORRIDOR WAS ONE MEANS OF WALKING FROM NORTH TO SOUTH SIDE OF CONSOLE FLOOR. INL NEGATIVE NO. HD46-18-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Systemic Console: Advanced analysis of exoplanetary data
NASA Astrophysics Data System (ADS)
Meschiari, Stefano; Wolf, Aaron S.; Rivera, Eugenio; Laughlin, Gregory; Vogt, Steve; Butler, Paul
2012-10-01
Systemic Console is a tool for advanced analysis of exoplanetary data. It comprises a graphical tool for fitting radial velocity and transits datasets and a library of routines for non-interactive calculations. Among its features are interactive plotting of RV curves and transits, combined fitting of RV and transit timing (primary and secondary), interactive periodograms and FAP estimation, and bootstrap and MCMC error estimation. The console package includes public radial velocity and transit data.
48. Photocopy of photograph (original print located in LBNL Photo ...
48. Photocopy of photograph (original print located in LBNL Photo Lab Collection). Photographer unknown. February 10, 1960. BEV-2003. COAXIAL, MAIN CONTROL ROOM CONSOLE MODIFICATIONS. B-51. - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
2013-10-28
Photographic coverage of Expedition 37 flight controllers on console with Flight Director's Jerry Jason and Tony Ceccacci during the undocking of Europe's 4th Automated Transfer Vehicle (ATV) from the International Space Station. Photo Date: October 28, 2013. Location: Building 30 - FCR1. Photographer: Robert Markowitz
1974-01-01
This Skylab-4 mission onboard photograph shows Astronaut Ed Gibson at the complex control and display console for the Apollo Telescope Mount solar telescopes located in the Skylab Multiple Docking Adapter. Astronauts watched the Sun, and photographed and recorded the solar activities, such as the birth of a solar flare.
Skoletsky, Jennifer S.; White, Brian T.; Austin, Jon W.
2007-01-01
Abstract: Despite the advanced technologies of battery back-up for heart-lung consoles and the availability of system-wide generators, electromechanical failure is still occurring. Several heartlung machine manufacturers still provide unsafe handcranking devices to use in the case of an emergency while using a roller blood pump. A new design has been engineered to eliminate safety and quality issues for the perfusionist and the patient when the need for handcranking presents itself. A ratchet-style handcranking device was fabricated by means of a steel plate with adjustable pins. The adjustable pins allow for use with different models of the Cobe, Stockert, and Jostra heart-lung consoles, which contain roller pumps with 180° roller heads. Additional modifications such as a 1:2 transmission and fluorescent markers are also used in the design. This innovative design is an improvement in safety compared with the current handcrank provided by Cobe, Stockert, and Jostra. With this modified handcranking device, accidental reverse rotation of the roller pump head cannot occur. Fluorescent markers will improve visualization of the pump head in low-light situations. The ergonomic design improves efficiency by reducing fatigue. Most importantly, a “safe” safety device will replace the current design provided by these manufacturers, thus improving the quality of care by health care providers. PMID:17672191
Further Development, Support and Enhancement of CONDUIT
NASA Technical Reports Server (NTRS)
Veronica, Moldoveanu; Levine, William S.
1999-01-01
From the first airplanes steered by handles, wheels, and pedals to today's advanced aircraft, there has been a century of revolutionary inventions, all of them contributing to flight quality. The stability and controllability of aircraft as they appear to a pilot are called flying or handling qualities. Many years after the first airplanes flew, flying qualities were identified and ranked from desirable to unsatisfactory. Later on engineers developed design methods to satisfy these practical criteria. CONDUIT, which stands for Control Designer's Unified Interface, is a modern software package that provides a methodology for optimization of flight control systems in order to improve the flying qualities. CONDUIT is dependent on an the optimization engine called CONSOL-OPTCAD (C-O). C-O performs multicriterion parametric optimization. C-O was successfully tested on a variety of control problems. The optimization-based computational system, C-O, requires a particular control system description as a MATLAB file and possesses the ability to modify the vector of design parameters in an attempt to satisfy performance objectives and constraints specified by the designer, in a C-type file. After the first optimization attempts on the UH-60A control system, an early interface system, named GIFCORCODE (Graphical Interface for CONSOL-OPTCAD for Rotorcraft Controller Design) was created.
Bonobos Protect and Console Friends and Kin
Palagi, Elisabetta; Norscia, Ivan
2013-01-01
Post-conflict third-party affiliation has been reported to have different functional meanings, one of them being consolation. Here, we tested the main hypotheses that have been put forth to explain the presence of this phenomenon at a functional level in the bonobo: Self-Protection Hypothesis, Victim-Protection Hypothesis, Relationship-Repair or Substitute for Reconciliation Hypothesis, and Consolation Hypothesis. By analyzing the data collected over 10 years, we investigated what factors affected the distribution of both spontaneous third party affiliation (initiated by the bystander) and solicited third party affiliation (initiated by the victim). We considered factors related to the individual features (sex, rank, age) of victim and bystander, their relationship quality (kinship, affiliation), and the effect that third party affiliation had on the victim (such as protection against further attacks and anxiety reduction). Both spontaneous and solicited third party affiliation reduced the probability of further aggression by group members on the victim (Victim-Protection Hypothesis supported). Yet, only spontaneous affiliation reduced victim anxiety (measured via self-scratching), thus suggesting that the spontaneous gesture – more than the protection itself – works in calming the distressed subject. The victim may perceive the motivational autonomy of the bystander, who does not require an invitation to provide post-conflict affiliative contact. Moreover, spontaneous - but not solicited - third party affiliation was affected by the bond between consoler and victim, being the relationship between consoler and aggressor irrelevant to the phenomenon distribution (Consolation Hypothesis supported). Spontaneous affiliation followed the empathic gradient described for humans, being mostly offered to kin, then friends, then acquaintances. Overall, our findings do not only indicate the consolatory function of spontaneous third-party affiliation but they also suggest that consolation in the bonobo may be an empathy-based phenomenon. PMID:24223924
Bonobos protect and console friends and kin.
Palagi, Elisabetta; Norscia, Ivan
2013-01-01
Post-conflict third-party affiliation has been reported to have different functional meanings, one of them being consolation. Here, we tested the main hypotheses that have been put forth to explain the presence of this phenomenon at a functional level in the bonobo: Self-Protection Hypothesis, Victim-Protection Hypothesis, Relationship-Repair or Substitute for Reconciliation Hypothesis, and Consolation Hypothesis. By analyzing the data collected over 10 years, we investigated what factors affected the distribution of both spontaneous third party affiliation (initiated by the bystander) and solicited third party affiliation (initiated by the victim). We considered factors related to the individual features (sex, rank, age) of victim and bystander, their relationship quality (kinship, affiliation), and the effect that third party affiliation had on the victim (such as protection against further attacks and anxiety reduction). Both spontaneous and solicited third party affiliation reduced the probability of further aggression by group members on the victim (Victim-Protection Hypothesis supported). Yet, only spontaneous affiliation reduced victim anxiety (measured via self-scratching), thus suggesting that the spontaneous gesture--more than the protection itself--works in calming the distressed subject. The victim may perceive the motivational autonomy of the bystander, who does not require an invitation to provide post-conflict affiliative contact. Moreover, spontaneous--but not solicited--third party affiliation was affected by the bond between consoler and victim, being the relationship between consoler and aggressor irrelevant to the phenomenon distribution (Consolation Hypothesis supported). Spontaneous affiliation followed the empathic gradient described for humans, being mostly offered to kin, then friends, then acquaintances. Overall, our findings do not only indicate the consolatory function of spontaneous third-party affiliation but they also suggest that consolation in the bonobo may be an empathy-based phenomenon.
Operating manual for the digital data-collection system for flow-control structures
Rorabaugh, J.I.; Rapp, W.L.
1986-01-01
This manual was written to help the user operate and maintain the digital data collection system for flow control structures. The system is used to measure daily discharge through river control dams. These dams commonly have tainter gates which are raised and lowered to keep the upper pool level relatively constant as the river flow changes. In order to measure the flow through such a structure, the positions of the tainter gates and the headwater and tailwater elevations must be known. From these data, the flow through the structure can be calculated. A typical digital data collection system is shown. Digitizing devices are mounted on the hoisting mechanism of each gate, as well as at the headwater and tailwater gages. Data from these digitizers are then routed by electrical cables to a central console where they are displayed and recorded on paper tape. If the dam has locks, a pressure-sensitive switch located in the lock activates a counter in the console which keeps track of the number of times the lock is drained and filled. (USGS)
VIew of Mission Control on first day of ASTP docking in Earth orbit
NASA Technical Reports Server (NTRS)
1975-01-01
An overall view of the Mission Operations Control Room in the Mission Control Center on the first day of the Apollo Soyuz Test Project (ASTP) docking in Earth orbit mission. The American ASTP flight controllers at JSC were monitoring the progress of the Soviet ASTP launch when this photograph was taken. The television monitor shows Cosmonaut Yuri V. Romanenko at his spacecraft communicator's console in the ASTP mission control center in the Soviet Union.
Underground coal operators install several new longwall mining systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fiscor, S.
2008-02-15
Several new names appear in the annual US Longwall Census, but the population remains the same: 52 although the number of longwall mines dropped from 40 to 47. CONSOL Energy remains the leader with 12 faces. Robert E. Murray owns 8 longwall mines followed by Arch Coal with 5 and Foundation Coal with 3. West Virginia has 13 longwalls followed by 9 in Pennsylvania, 7 in Utah and 6 in Alabama. The article describes CONSOL Energy's operations. A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries,more » depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs.« less
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25114 (16 August 2001) --- Flight director John Shannon monitors data at his console in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, STS-105 mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of two scheduled space walks to perform work on the International Space Station (ISS).
121. VIEW OF CABINETS ON WEST SIDE OF LANDLINE INSTRUMENTATION ...
121. VIEW OF CABINETS ON WEST SIDE OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751). FEATURES LEFT TO RIGHT: FACILITY DISTRIBUTION CONSOLE FOR WATER CONTROL SYSTEMS, PROPULSION ELECTRICAL CHECKOUT SYSTEM (PECOS), LOGIC CONTROL AND MONITOR UNITS FOR BOOSTER AND FUEL SYSTEMS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Interior of display area (room 101), looking south towards TV ...
Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
2001-07-01
JSC2001-E-21574 (16 July 2001) --- ISS Orbit 1 flight director Sally Davis and Derek Hassman monitor International Space Station (ISS) issues at their consoles in the blue flight control room (BFCR) in Houston's Mission Control Center (MCC). At the time this photo was taken, the STS-104 and Expedition Two crews had joined efforts to perform a number of station-related tasks.
2002-03-01
JSC2002-E-08143 (1 March 2002) --- Astronaut Charles O. Hobaugh, seated at the Spacecraft Communicator (CAPCOM) console in the Shuttle Flight Control Room of the Johnson Space Center's Mission Control Center, gives a thumbs up signal, obviously connected to improving weather at the launch site for the Space Shuttle Columbia several hundred miles away in Florida. Astronaut William A. Oefelein is partially obscured in the background.
NASA Technical Reports Server (NTRS)
Johnson, Kathy A.; Shek, Molly
2003-01-01
Astronauts in a space station are to some extent like patients in an intensive care unit (ICU). Medical support of a mission crew will require acquisition, transmission, distribution, integration, and archiving of significant amounts of data. These data are acquired by disparate systems and will require timely, reliable, and secure distribution to different communities for the execution of various tasks of space missions. The goal of the Comprehensive Medical Information System (CMIS) Project at Johnson Space Center Flight Medical Clinic is to integrate data from all Medical Operations sources, including the reference information sources and the electronic medical records of astronauts. A first step toward the full CMIS implementation is to integrate and organize the reference information sources and the electronic medical record with the Flight Surgeons console. In order to investigate this integration, we need to understand the usability problems of the Flight Surgeon's console in particular and medical information systems in general. One way to achieve this understanding is through the use of user and task analyses whose general purpose is to ensure that only the necessary and sufficient task features that match users capacities will be included in system implementations. The goal of this summer project was to conduct user and task analyses employing cognitive engineering techniques to analyze the task of the Flight Surgeons and Biomedical Engineers (BMEs) while they worked on Console. The techniques employed were user interviews, observations and a questionnaire to collect data for which a hierarchical task analysis and an information resource assessment were performed. They are described in more detail below. Finally, based on our analyses, we make recommendations for improvements to the support structure.
Waters, Benjamin; Sample, Alanson; Smith, Joshua; Bonde, Pramod
2011-11-01
Heart failure is a terminal disease with a very poor prognosis. Although the gold standard of treatment remains heart transplant, only a minority of patients can benefit from transplants. Another promising alternative is mechanical circulatory assistance using ventricular assist devices. The authors envision a completely implantable cardiac assist system affording tether-free mobility in an unrestricted space powered wirelessly by the innovative Free-Range Resonant Electrical Energy Device (FREE-D) system. Patients will have no power drivelines traversing the skin, and this system will allow power to be delivered over room distances and will eliminate trouble-prone wirings, bulky consoles, and replaceable batteries. Copyright © 2011 Elsevier Inc. All rights reserved.
National Manpower Inventory. Volume 3. Technical Documentation for Software for the Model
1985-09-01
Technician APS-96 Search Radar IMA Technician USM-449 (V) & AAI 5500 Series ATE Int Maintenance Level Tech. CO CP-413/ASA-27A SACE TesI Bench IMA...MATE) Test Console IMA Technician ALQ-91/108 DECM IMA Technician ALQ-99 ECM Jammer/Tmilter & ALM-107 TesI Console IMA Technician ALQ-99 ECM Track...Receivers & ALM-109 TesI Console IMA Technician ECM Systems Intermediate Maintenance Technician ASM-347 (GT-1) SACE Programmer/Mainlenanca IMA
NIF ICCS network design and loading analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tietbohl, G; Bryant, R
The National Ignition Facility (NIF) is housed within a large facility about the size of two football fields. The Integrated Computer Control System (ICCS) is distributed throughout this facility and requires the integration of about 40,000 control points and over 500 video sources. This integration is provided by approximately 700 control computers distributed throughout the NIF facility and a network that provides the communication infrastructure. A main control room houses a set of seven computer consoles providing operator access and control of the various distributed front-end processors (FEPs). There are also remote workstations distributed within the facility that allow providemore » operator console functions while personnel are testing and troubleshooting throughout the facility. The operator workstations communicate with the FEPs which implement the localized control and monitoring functions. There are different types of FEPs for the various subsystems being controlled. This report describes the design of the NIF ICCS network and how it meets the traffic loads that will are expected and the requirements of the Sub-System Design Requirements (SSDR's). This document supersedes the earlier reports entitled Analysis of the National Ignition Facility Network, dated November 6, 1996 and The National Ignition Facility Digital Video and Control Network, dated July 9, 1996. For an overview of the ICCS, refer to the document NIF Integrated Computer Controls System Description (NIF-3738).« less
ERGONOMICS ABSTRACTS 48983-49619.
ERIC Educational Resources Information Center
Ministry of Technology, London (England). Warren Spring Lab.
THE LITERATURE OF ERGONOMICS, OR BIOTECHNOLOGY, IS CLASSIFIED INTO 15 AREAS--METHODS, SYSTEMS OF MEN AND MACHINES, VISUAL AND AUDITORY AND OTHER INPUTS AND PROCESSES, INPUT CHANNELS, BODY MEASUREMENTS, DESIGN OF CONTROLS AND INTEGRATION WITH DISPLAYS, LAYOUT OF PANELS AND CONSOLES, DESIGN OF WORK SPACE, CLOTHING AND PERSONAL EQUIPMENT, SPECIAL…
2013-10-22
PHOTO DATE: 10-22-13 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 37 flight controllers on console with Flight Director Courtenay McMillan during grapple and unberthing of the Orbital Sciences/Cygnus cargo ship from the nadir port of the Harmony module on ISS. PHOTOGRAPHER: BILL STAFFORD
2013-10-22
PHOTO DATE: 10-22-13 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 37 flight controllers on console with Flight Director Courtenay McMillan during grapple and unberthing of the Orbital Sciences/Cygnus cargo ship from the nadir port of the Harmony module on ISS. PHOTOGRAPHER: BILL STAFFORD
2013-10-22
PHOTO DATE: 10-22-13 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 37 flight controllers on console with Flight Director Courtenay McMillan during grapple and unberthing of the Orbital Sciences/Cygnus cargo ship from the nadir port of the Harmony module on ISS. PHOTOGRAPHER: BILL STAFFORD
2013-10-22
PHOTO DATE: 10-22-13 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 37 flight controllers on console with Flight Director Courtenay McMillan during grapple and unberthing of the Orbital Sciences/Cygnus cargo ship from the nadir port of the Harmony module on ISS. PHOTOGRAPHER: BILL STAFFORD
11. DETAIL OF TERRACOTTA DECORATION, SHOWING SCROLL CONSOLE, WAVE ORNAMENT, ...
11. DETAIL OF TERRACOTTA DECORATION, SHOWING SCROLL CONSOLE, WAVE ORNAMENT, EGG-AND-DART, NYMPH HEADS AND FOLIATE PATTERN AROUND WINDOWS - City Hall, Atlantic & Tennessee Avenues, Atlantic City, Atlantic County, NJ
Koczor, Bálint; Rohonczy, János
2015-01-01
Concerning many former liquid or hybrid liquid/solid NMR consoles, the built in Analog-to-Digital Converters (ADCs) are incapable of digitizing the fids at sampling rates in the MHz range. Regarding both strong anisotropic interactions in the solid state and wide chemical shift dispersion nuclei in solution phase such as (195)Pt, (119)Sn, (207)Pb etc., the spectrum range of interest might be in the MHz range. As determining the informative tensor components of anisotropic NMR interactions requires nonlinear fitting over the whole spectrum including the asymptotic baseline, it is prohibited by low sampling rates of the ADCs. Wide spectrum width is also useful in solution NMR, since windowing of wide chemical shift ranges is avoidable. We built an external analog to digital converter with 10 MHz maximal sampling rate, which can work simultaneously with the built in ADC of the spectrometer. The ADC was tested on both Bruker DRX and Avance-I NMR consoles. In addition to the analog channels it only requires three external digital lines of the NMR console. The ADC sends data to PC via USB. The whole process is controlled by software written in JAVA which is implemented under TopSpin. Copyright © 2015 Elsevier Inc. All rights reserved.
Simpler ISS Flight Control Communications and Log Keeping via Social Tools and Techniques
NASA Technical Reports Server (NTRS)
Scott, David W.; Cowart, Hugh; Stevens, Dan
2012-01-01
The heart of flight operations control involves a) communicating effectively in real time with other controllers in the room and/or in remote locations and b) tracking significant events, decisions, and rationale to support the next set of decisions, provide a thorough shift handover, and troubleshoot/improve operations. International Space Station (ISS) flight controllers speak with each other via multiple voice circuits or loops, each with a particular purpose and constituency. Controllers monitor and/or respond to several loops concurrently. The primary tracking tools are console logs, typically kept by a single operator and not visible to others in real-time. Information from telemetry, commanding, and planning systems also plays into decision-making. Email is very secondary/tertiary due to timing and archival considerations. Voice communications and log entries supporting ISS operations have increased by orders of magnitude because the number of control centers, flight crew, and payload operations have grown. This paper explores three developmental ground system concepts under development at Johnson Space Center s (JSC) Mission Control Center Houston (MCC-H) and Marshall Space Flight Center s (MSFC) Payload Operations Integration Center (POIC). These concepts could reduce ISS control center voice traffic and console logging yet increase the efficiency and effectiveness of both. The goal of this paper is to kindle further discussion, exploration, and tool development.
Future of robotic surgery in urology.
Rassweiler, Jens J; Autorino, Riccardo; Klein, Jan; Mottrie, Alex; Goezen, Ali Serdar; Stolzenburg, Jens-Uwe; Rha, Koon H; Schurr, Marc; Kaouk, Jihad; Patel, Vipul; Dasgupta, Prokar; Liatsikos, Evangelos
2017-12-01
To provide a comprehensive overview of the current status of the field of robotic systems for urological surgery and discuss future perspectives. A non-systematic literature review was performed using PubMed/Medline search electronic engines. Existing patents for robotic devices were researched using the Google search engine. Findings were also critically analysed taking into account the personal experience of the authors. The relevant patents for the first generation of the da Vinci platform will expire in 2019. New robotic systems are coming onto the stage. These can be classified according to type of console, arrangement of robotic arms, handles and instruments, and other specific features (haptic feedback, eye-tracking). The Telelap ALF-X robot uses an open console with eye-tracking, laparoscopy-like handles with haptic feedback, and arms mounted on separate carts; first clinical trials with this system were reported in 2016. The Medtronic robot provides an open console using three-dimensional high-definition video technology and three arms. The Avatera robot features a closed console with microscope-like oculars, four arms arranged on one cart, and 5-mm instruments with six degrees of freedom. The REVO-I consists of an open console and a four-arm arrangement on one cart; the first experiments with this system were published in 2016. Medicaroid uses a semi-open console and three robot arms attached to the operating table. Clinical trials of the SP 1098-platform using the da Vinci Xi for console-based single-port surgery were reported in 2015. The SPORT robot has been tested in animal experiments for single-port surgery. The SurgiBot represents a bedside solution for single-port surgery providing flexible tube-guided instruments. The Avicenna Roboflex has been developed for robotic flexible ureteroscopy, with promising early clinical results. Several console-based robots for laparoscopic multi- and single-port surgery are expected to come to market within the next 5 years. Future developments in the field of robotic surgery are likely to focus on the specific features of robotic arms, instruments, console, and video technology. The high technical standards of four da Vinci generations have set a high bar for upcoming devices. Ultimately, the implementation of these upcoming systems will depend on their clinical applicability and costs. How these technical developments will facilitate surgery and whether their use will translate into better outcomes for our patients remains to be determined. © 2017 The Authors BJU International © 2017 BJU International Published by John Wiley & Sons Ltd.
Bokhari, Ravia; Bollman-McGregor, Jyoti; Kahoi, Kanav; Smith, Marshall; Feinstein, Ara; Ferrara, John
2010-06-01
Assuring quality surgical trainees within the confines of reduced work hours mandates reassessment of educational paradigms. Surgical simulators have been shown to be effective in teaching surgical residents, but their use is limited by cost and time constraints. The Nintendo Wii gaming console is inexpensive and allows natural hand movements similar to those performed in laparoscopy to guide game play. We hypothesize that surgical skills can be improved through take-home simulators adapted from affordable off-the-shelf gaming consoles. A total of 21 surgical residents participated in a prospective, controlled study. An experimental group of 14 surgical residents was assigned to play Marble Mania on the Nintendo Wii using a unique physical controller that interfaces with the WiiMote controller followed by a simulated electrocautery task. Seven residents assigned to the control group performed the electrocautery task without playing the game first. When compared with the control group, the experimental group performed the task with fewer errors and superior movement proficiency (P < 0.05). The experimental group demonstrated increased ambidexterity with improvement in proficiency of the nondominant hand over time. In conclusion, the Nintendo Wii gaming device along with Marble Mania serves as an effective take-home surgical simulator.
STS-120 Flight Controllers on console during mission
2007-10-31
JSC2007-E-095788 (3 Nov. 2007) --- Flight directors Norm Knight (left) and Bryan Lunney, inside the shuttle flight control room of JSC's Mission Control Center, monitor the progress of the Nov. 3 spacewalk by two members of Discovery's crew, while the space shuttle is docked with the International Space Station in Earth orbit. Astronaut Scott Parazynski was busy at work on repairing a tear in a solar panel on the orbiting outpost.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080444 (14 May 2010) --- Flight director Richard Jones is pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
Views of the mission control center during STS-9
NASA Technical Reports Server (NTRS)
1983-01-01
Busy moment in the customer management room (CMR) of JSC's mission control center during Spacelab 1 day 2. Three personnel from the European Space Agency (ESA) huddle around a console along with Ralph Hoodless (seated at left), of the George C. Marshall Space Flight Center. Others pictured are Lars Tedeman and Hildegard Binck (standing); and Frank Longhurst (seated right). Tedeman is with ESA's quality control division and Longhurst is Spacelab operations manager.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25113 (16 August 2001) --- Flight director Kelly Beck monitors data at her console in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, STS-105 mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of the two scheduled space walks to perform work on the International Space Station (ISS).
Biocybernetic Control in Man-Machine Interaction
1976-03-01
manently ( prosthesis , limb control, sensory substitution etc ) or temporarily (hi-performance aircraft in hi-G pull, spacecraft occupants in low...through some kind of computer terminal albeit probably one that was designed espe- cially for the task. An aircraft cockpit or the control console of...such as the new Biomedical P7M. The BCI oroqra’n is interactive and designed to run in real-time but otherwise woud give identical results. Selection
1976-09-01
Model AN/ UGC -59A teletype and paper-tape punch console. This unit is connected with the Intellec 8 computer and punching operations are controlled by...order to use this program, the microprocessor would have to be one of the many types on the market that make use of the INTEL 8008-1 CPD chip. The use
CONSTELLATION Images from other centers - February 2010
2010-02-08
JSC2010-E-019040 (8 Feb. 2010) --- Brent Jett, director, flight crew operations, watches a monitor at his console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Endeavour's STS-130 launch. John McCullough (seated), chief of the flight director office, is at right.
Crewstation Assessment of Reach as Applied to the OH-58A Helicopter
1984-12-13
CLUSTER ENO ENO OFICE FIELD 0gMA BR? OMR BRI T CONSOLE LTS NST LTSI OFF OFF NO BRT MVO ANTI COLLISION FOS LTS Lii LTS OFF *OFF CFF OFF OFr AUTO Hyp...gINTER)-- 2 ANALISIS OPION(1-ALL OPERATORq,2-OPZRATORS ON LOS ONLY)--L 1 RFACH ALCORITHNl(lPASS THROUGH CONTROL,2-TERNINAIE &T CONTROL)-- 2 ***OPERATOR NO
9. View southeast corner of perimeter acquisition radar power plant ...
9. View southeast corner of perimeter acquisition radar power plant room #214, control room; showing central monitoring station console in foreground. Well and booster control panel in left background and electric power management panel on far right - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Power Plant, In Limited Access Area, Southwest of PARB at end of Service Road B, Nekoma, Cavalier County, ND
Educational Benefits of Using Game Consoles in a Primary Classroom: A Randomised Controlled Trial
ERIC Educational Resources Information Center
Miller, David J.; Robertson, Derek P.
2011-01-01
It is known that computer games are motivating for children, but there is limited direct evidence of their effects on classroom learning. The studies that are available tend to be limited in terms of output data reported, or small in scale, or both. The aim of this randomised controlled trial was to upscale a recent study by Miller and Robertson…
West wall, display area (room 101), view 1 of 4: ...
West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
2010-04-05
JSC2010-E-046805 (5 April 2010) --- John McCullough, chief of the Flight Director Office; and Janet Kavandi, deputy director, Flight Crew Operations, watch television screens at the Mission Operations Directorate (MOD) console in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch a few hundred miles away in Florida, site of space shuttle Discovery's STS-131 liftoff.
Harrington, Cuan M; Chaitanya, Vishwa; Dicker, Patrick; Traynor, Oscar; Kavanagh, Dara O
2018-02-14
Video gaming demands elements of visual attention, hand-eye coordination and depth perception which may be contiguous with laparoscopic skill development. General video gaming has demonstrated altered cortical plasticity and improved baseline/acquisition of minimally invasive skills. The present study aimed to evaluate for skill acquisition associated with a commercially available dedicated laparoscopic video game (Underground) and its unique (laparoscopic-like) controller for the Nintendo®Wii U™ console. This single-blinded randomised controlled study was conducted with laparoscopically naive student volunteers of limited (< 3 h/week) video gaming backgrounds. Baseline laparoscopic skills were assessed using four basic tasks on the Virtual Reality (VR) simulator (LAP Mentor TM , 3D systems, Colorado, USA). Twenty participants were randomised to two groups; Group A was requested to complete 5 h of video gaming (Underground) per week and Group B to avoid gaming beyond their normal frequency. After 4 weeks participants were reassessed using the same VR tasks. Changes in simulator performances were assessed for each group and for intergroup variances using mixed model regression. Significant inter- and intragroup performances were present for the video gaming and controls across four basic tasks. The video gaming group demonstrated significant improvements in thirty-one of the metrics examined including dominant (p ≤ 0.004) and non-dominant (p < 0.050) instrument movements, pathlengths (p ≤ 0.040), time taken (p ≤ 0.021) and end score [p ≤ 0.046, (task-dependent)]. The control group demonstrated improvements in fourteen measures. The video gaming group demonstrated significant (p < 0.05) improvements compared to the control in five metrics. Despite encouraged gameplay and the console in participants' domiciles, voluntary engagement was lower than directed due to factors including: game enjoyment (33.3%), lack of available time (22.2%) and entertainment distractions (11.1%). Our work revealed significant value in training using a dedicated laparoscopic video game for acquisition of virtual laparoscopic skills. This novel serious game may provide foundations for future surgical developments on game consoles in the home environment.
STS-116 Flight Controllers on console during mission - STS-116 Orbit 2
2006-12-20
JSC2006-E-54743 (20 Dec. 2006) --- Astronaut K. Megan McArthur, STS-116 Orbit 2 spacecraft communicator (CAPCOM), talks with the astronauts aboard the Space Shuttle Discovery as they wind down toward the final 48 hours of an almost two-week mission in space.
Veldhuis, Lydian; van Grieken, Amy; Renders, Carry M; Hirasing, Remy A; Raat, Hein
2014-01-01
The global increase in childhood overweight and obesity has been ascribed partly to increases in children's screen time. Parents have a large influence on their children's screen time. Studies investigating parenting and early childhood screen time are limited. In this study, we investigated associations of parenting style and the social and physical home environment on watching TV and using computers or game consoles among 5-year-old children. This study uses baseline data concerning 5-year-old children (n = 3067) collected for the 'Be active, eat right' study. Children of parents with a higher score on the parenting style dimension involvement, were more likely to spend >30 min/day on computers or game consoles. Overall, families with an authoritative or authoritarian parenting style had lower percentages of children's screen time compared to families with an indulgent or neglectful style, but no significant difference in OR was found. In families with rules about screen time, children were less likely to watch TV>2 hrs/day and more likely to spend >30 min/day on computers or game consoles. The number of TVs and computers or game consoles in the household was positively associated with screen time, and children with a TV or computer or game console in their bedroom were more likely to watch TV>2 hrs/day or spend >30 min/day on computers or game consoles. The magnitude of the association between parenting style and screen time of 5-year-olds was found to be relatively modest. The associations found between the social and physical environment and children's screen time are independent of parenting style. Interventions to reduce children's screen time might be most effective when they support parents specifically with introducing family rules related to screen time and prevent the presence of a TV or computer or game console in the child's room.
Veldhuis, Lydian; van Grieken, Amy; Renders, Carry M.; HiraSing, Remy A.; Raat, Hein
2014-01-01
Introduction The global increase in childhood overweight and obesity has been ascribed partly to increases in children's screen time. Parents have a large influence on their children's screen time. Studies investigating parenting and early childhood screen time are limited. In this study, we investigated associations of parenting style and the social and physical home environment on watching TV and using computers or game consoles among 5-year-old children. Methods This study uses baseline data concerning 5-year-old children (n = 3067) collected for the ‘Be active, eat right’ study. Results Children of parents with a higher score on the parenting style dimension involvement, were more likely to spend >30 min/day on computers or game consoles. Overall, families with an authoritative or authoritarian parenting style had lower percentages of children's screen time compared to families with an indulgent or neglectful style, but no significant difference in OR was found. In families with rules about screen time, children were less likely to watch TV>2 hrs/day and more likely to spend >30 min/day on computers or game consoles. The number of TVs and computers or game consoles in the household was positively associated with screen time, and children with a TV or computer or game console in their bedroom were more likely to watch TV>2 hrs/day or spend >30 min/day on computers or game consoles. Conclusion The magnitude of the association between parenting style and screen time of 5-year-olds was found to be relatively modest. The associations found between the social and physical environment and children's screen time are independent of parenting style. Interventions to reduce children's screen time might be most effective when they support parents specifically with introducing family rules related to screen time and prevent the presence of a TV or computer or game console in the child's room. PMID:24533092
Mediating consolation with suicidal patients.
Gilje, Fredricka; Talseth, Anne-Grethe
2007-07-01
Psychiatric nurses frequently encounter suicidal patients. Caring for such patients often raises ethical questions and dilemmas. The research question for this study was: 'What understandings are revealed in texts about consolation and psychiatric nurses' responses to suicidal patients?' A Gadamerian approach guided re-interpretation of published texts. Through synthesizing four interpretive phases, a comprehensive interpretation emerged. This revealed being 'at home' with self, or an ethical way of being, as a hermeneutic understanding of a way to become ready to mediate consolation with suicidal patients. Trustworthiness was addressed by means of the qualities of auditability, credibility and confirmability. This re-interpretation adds to nursing knowledge, enhances understanding of previous research findings, provides pre-understanding for further research and reveals the value of hermeneutic inquiry in nursing. It also deepens understanding of a published model of consolation. These understandings may help to guide nurses who are struggling with suicidal patients.
2010-12-17
CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From back, are Assistant Launch Orbiter Test Conductor Mark Taffet, Launch Orbiter Test Conductor John Kracsun, STS-133 NASA Test Director Steve Payne, NASA Commentator Allard Beutel, NASA Test Director Jeremy Graeber and STS-133 Assistant NASA Test Director Jeff Spaulding. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP). Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston
STS-116 Flight Controllers on console during mission - WFCR - Orbit 2
2006-12-20
JSC2006-E-54711 (21 Dec. 2006) --- Overall view of the Shuttle Flight Control Room in the Johnson Space Center's Mission Control Center during the final deployment of some small satellites from Space Shuttle Discovery's cargo bay. On a screen in the front of the control room, a Department of Defense pico-satellite known as Atmospheric Neutral Density Experiment (ANDE) is released from the shuttle's payload bay by STS-116 crewmembers and viewed via live television on the ground.
INFLIGHT (MISSION CONTROL CENTER [MCC]) - STS-1 - ELLINGTON AFB (EAFB), TX
1981-04-13
S81-32876 (13 April 1981) --- Brig. Gen. William T. Twinting studies the monitor at the Department of Defense (DOD) console in the mission operations control room (MOCR) at the Johnson Space Center?s Mission Control Center (MCC). He is deputy DOD manager for Space Shuttle Support Operations. Gen. Twinting and the other flight controllers seen in the background listen as astronaut John W. Young, STS-1 commander, describes the scenery of a downlink TV transmission. Photo credit: NASA
Inflight - STS-11/41B (MISSION CONTROL CENTER [MCC]) - JSC
1984-02-08
S84-26503 (7 Feb 1984) --- This wide angle, overall view of activity in the mission operations control room in the Johnson Space Center?s mission control center, was photographed during the first even non-tethered extravehicular activity (EVA) in space. The large MOCR monitor and those at individual consoles feed to ground controllers the spectacular scene of Astronaut Bruce McCandless II ?suspended? I space above the blue and white Earth. The scene was photographed at 7:30 a.m. (CST), February 7, 1984.
STS-26 simulation activities in JSC Mission Control Center (MCC)
NASA Technical Reports Server (NTRS)
1987-01-01
In JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR), flight controller Granvil A. Pennington, leaning on console, listens to communications during the STS-26 integrated simulations in progress between MCC and JSC Mission Simulation and Training Facility Bldg 5 fixed-base (FB) shuttle mission simulator (SMS). MCC FCR visual displays are seen in background. Five veteran astronauts were in the FB-SMS rehearsing their roles for the scheduled June 1988 flight aboard Discovery, Orbiter Vehicle (OV) 103.
C-TIC Console Operator's User Manual
DOT National Transportation Integrated Search
1996-07-01
The C-TIC Console Operator's User Manual is designed to assist the operator at : the Corridor Transportation Information Center with the navigation and use of : the application programs in the C-TIC. This document will concentrate solely on : the ext...
Experience with ActiveX control for simple channel access
DOE Office of Scientific and Technical Information (OSTI.GOV)
Timossi, C.; Nishimura, H.; McDonald, J.
2003-05-15
Accelerator control system applications at Berkeley Lab's Advanced Light Source (ALS) are typically deployed on operator consoles running Microsoft Windows 2000 and utilize EPICS[2]channel access for data access. In an effort to accommodate the wide variety of Windows based development tools and developers with little experience in network programming, ActiveX controls have been deployed on the operator stations. Use of ActiveX controls for use in the accelerator control environment has been presented previously[1]. Here we report on some of our experiences with the use and development of these controls.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080432 (14 May 2010) --- Astronaut Charles Hobaugh, spacecraft communicator (CAPCOM) for the STS-132 mission, is pictured in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080463 (14 May 2010) --- Brent Jett, director, flight crew operations, is pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis' scheduled STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-122 flight controllers in WFCR during launch
2008-02-07
JSC2008-E-010344 (7 Feb. 2008) --- Flight directors Norm Knight (left), Bryan Lunney and Richard Jones monitor data at their consoles in the space shuttle flight control room of Johnson Space Center's Mission Control Center (MCC) during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis' scheduled STS-122 launch. Liftoff occurred at 2:45 p.m. (EST) on Feb. 7, 2008 from launch pad 39A at Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080460 (14 May 2010) --- Brent Jett, director, flight crew operations; and flight director Norm Knight (foreground) watch a monitor in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during the launch of space shuttle Atlantis a few hundred miles away in Florida. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25121 (16 August 2001) --- Astronaut Joseph R. Tanner, STS-105 spacecraft communicator (CAPCOM), monitors the progress of the extravehicular activity at his console in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of two scheduled space walks to perform work on the International Space Station (ISS).
Mission control activity during STS-61 EVA-2
1993-12-05
Harry Black, at the Integrated Communications Officer's console in the Mission Control Center (MCC), monitors the second extravehicular activity (EVA-2) of the STS-61 Hubble Space Telescope (HST) servicing mission. Others pictured, left to right, are Judy Alexander, Kathy Morrison and Linda Thomas. Note monitor scene of one of HST's original solar array panels floating in space moments after being tossed away by Astronaut Kathryn C. Thornton.
Coverage of STS-104 Launch Coverage of Flight Controllers in MCC.
2001-07-12
JSC2001-E-21337 (12 July 2001) --- Rob Navias (right), at the Public Affairs Officer (PAO) console in Houston's Mission Control Center (MCC), awaits to do his commentary as he views the firing of Space Shuttle Atlantis' main engines on his monitor just seconds before launch and the beginning of the STS-104 mission. Daniel K. Carpenter, director of the Public Affairs Office, looks on.
View northeast of model board representing northern portion of trackage ...
View northeast of model board representing northern portion of trackage monitored by the Philadelphia poer directors center; free-standing cabinet at far right center of photograph is an early computer which supplanted operator control from Lamokin Tower in the 1980's; switchboard console #1 for controlling indicating lights is at lower right - Thirtieth Street Station, Power Director Center, Thirtieth & Market Streets in Amtrak Railroad Station, Philadelphia, Philadelphia County, PA
1971-12-01
This December 1971 photograph shows the internal configuration of Skylab's Multiple Docking Adapter (MDA) as it appeared during the Crew Compartment and Function Review at the Martin-Marietta Corporation's Space Center facility in Denver, Colorado. At left is the control and display console for the Apollo Telescope Mount. Designed and manufactured by the Marshall Space Flight Center, the MDA housed a number of experiment control and stowage units and provided a docking port for the Apollo Command Module.
2014-01-01
Background Being with dying people is an integral part of nursing, yet many nurses feel unprepared to accompany people through the process of dying, reporting a lack of skills in psychosocial and spiritual care, resulting in high levels of moral distress, grief and burnout. The aim of this study is to describe the meaning of hospice nurses’ lived experience with alleviating dying patients’ spiritual and existential suffering. Methods This is a qualitative study. Hospice nurses were interviewed individually and asked to narrate about their experiences with giving spiritual and existential care to terminally ill hospice patients. Data analysis was conducted using phenomenological hermeneutical method. Results The key spiritual and existential care themes identified, were sensing existential and spiritual distress, tuning inn and opening up, sensing the atmosphere in the room, being moved and touched, and consoling through silence, conversation and religious consolation. Conclusions Consoling existential and spiritual distress is a deeply personal and relational practice. Nurses have a potential to alleviate existential and spiritual suffering through consoling presence. By connecting deeply with patients and their families, nurses have the possibility to affirm the patients’ strength and facilitate their courage to live a meaningful life and die a dignified death. PMID:25214816
ERIC Educational Resources Information Center
Evanson, Nick
2004-01-01
Basic electronic devices have been used to great effect with console computer games. This paper looks at a range of devices from the very simple, such as microswitches and potentiometers, up to the more complex Hall effect probe. There is a great deal of relatively straightforward use of simple devices in computer games systems, and having read…
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS ...
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS IN CONSOLE LOCATED CENTRALLY IN SLC-3E CONTROL ROOM. FROM LEFT TO RIGHT IN BACKGROUND: LAUNCH OPERATOR, LAUNCH ANALYST, AND FACILITIES PANELS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Digital Autonomous Terminal Access Communication (DATAC) system
NASA Technical Reports Server (NTRS)
Novacki, Stanley M., III
1987-01-01
In order to accommodate the increasing number of computerized subsystems aboard today's more fuel efficient aircraft, the Boeing Co. has developed the DATAC (Digital Autonomous Terminal Access Control) bus to minimize the need for point-to-point wiring to interconnect these various systems, thereby reducing total aircraft weight and maintaining an economical flight configuration. The DATAC bus is essentially a local area network providing interconnections for any of the flight management and control systems aboard the aircraft. The task of developing a Bus Monitor Unit was broken down into four subtasks: (1) providing a hardware interface between the DATAC bus and the Z8000-based microcomputer system to be used as the bus monitor; (2) establishing a communication link between the Z8000 system and a CP/M-based computer system; (3) generation of data reduction and display software to output data to the console device; and (4) development of a DATAC Terminal Simulator to facilitate testing of the hardware and software which transfer data between the DATAC's bus and the operator's console in a near real time environment. These tasks are briefly discussed.
Overview and forensic investigation approaches of the gaming console Sony PlayStation Portable
NASA Astrophysics Data System (ADS)
Schön, Stephan; Schön, Ralph; Kröger, Knut; Creutzburg, Reiner
2013-03-01
This paper addresses the forensically interesting features of the Sony PlayStation Portable game console. The construction and the internal structure are analyzed precisely and interesting forensic features of the operating system and the file system are presented.
Technology transfer of operator-in-the-loop simulation
NASA Technical Reports Server (NTRS)
Yae, K. H.; Lin, H. C.; Lin, T. C.; Frisch, H. P.
1994-01-01
The technology developed for operator-in-the-loop simulation in space teleoperation has been applied to Caterpillar's backhoe, wheel loader, and off-highway truck. On an SGI workstation, the simulation integrates computer modeling of kinematics and dynamics, real-time computational and visualization, and an interface with the operator through the operator's console. The console is interfaced with the workstation through an IBM-PC in which the operator's commands were digitized and sent through an RS-232 serial port. The simulation gave visual feedback adequate for the operator in the loop, with the camera's field of vision projected on a large screen in multiple view windows. The view control can emulate either stationary or moving cameras. This simulator created an innovative engineering design environment by integrating computer software and hardware with the human operator's interactions. The backhoe simulation has been adopted by Caterpillar in building a virtual reality tool for backhoe design.
2015-02-01
instructions on how to build and use RTEMS in two different operating environments. 15. SUBJECT TERMS RTEMS, SPARC simulator, Raspberry Pi . 16. SECURITY...system .............................................. 15 3. Hardware requirements for the Raspberry Pi console ................................ 16 4...requirements for the Raspberry Pi console ................................... 16 8. Software requirements for the Windows system
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
... customers using the CoLo Console \\3\\ during the months of January and February of 2013, provided that such... cabinets continues to exceed the Baseline Number. \\3\\ The ``CoLo Console'' is NASDAQ's web-based ordering...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
... ordered by customers using the CoLo Console \\3\\ during the months of January and February of 2013... number of cabinets continues to exceed the Baseline Number. \\3\\ The ``CoLo Console'' is BX's web-based...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... the CoLo Console \\3\\ during the months of January and February of 2013, provided that such cabinets... exceed the Baseline Number. \\3\\ The ``CoLo Console'' is Phlx's web-based ordering tool, and it is the...
User Input Devices’ Impact on Virtual Desktop Trainers
2010-07-01
effectiveness?” 3 Background • Literature Review – Evolution of game controllers – Use of Game controllers outside of video games – Personnel...computers verses console video games • Virtual Battlespace 2 (VBS2TM) • Sony PlayStation 3 game controller • Natural Point TrackIR 5 4 Methodology • Phases...gamers” averaged 4.6 years of experience playing video games at 2.1 hours per week – The “Gamers” averaged 10.4 years of experience playing PC Games
MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP) - JSC
1975-07-17
S75-28683 (17 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during the joint U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit. M.P. Frank, the American senior ASTP flight director, is seated at his console in the right foreground. He is watching the large television monitor which shows a view of the Soyuz spacecraft as seen from the Apollo spacecraft during rendezvous and docking maneuvers.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080410 (14 May 2010) --- Astronauts Steve Frick (standing) and Charles Hobaugh, both spacecraft communicators (CAPCOM) for the STS-132 mission, are pictured in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis? STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-125 Flight Controllers on Console - (Orbit Shift)
2009-05-11
JSC2009-E-118822 (11 May 2009) --- Flight director Norm Knight is pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis? scheduled STS-125 launch to service the Hubble Space Telescope. Liftoff was on time at 2:01 p.m. (EDT) on May 11, 2009 from launch pad 39A at NASA's Kennedy Space Center.
STS-132/ULF4 WFCR Flight Controllers on Console
2010-05-14
JSC2010-E-080409 (14 May 2010) --- Brent Jett (left), director, flight crew operations; and flight director Norm Knight are pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Atlantis' scheduled STS-132 launch. Liftoff was on time at 2:20 p.m. (EDT) on May 14, 2010 from launch pad 39A at NASA's Kennedy Space Center.
STS-125 Flight Controllers on Console - (Orbit Shift)
2009-05-11
JSC2009-E-118883 (11 May 2009) --- Flight director Tony Ceccacci is pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis? scheduled STS-125 launch to service the Hubble Space Telescope. Liftoff was on time at 2:01 p.m. (EDT) on May 11, 2009 from launch pad 39A at NASA's Kennedy Space Center.
STS-125 Flight Controllers on Console - (Orbit Shift)
2009-05-11
JSC2009-E-118882 (11 May 2009) --- Flight director Norm Knight is pictured in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center during launch countdown activities a few hundred miles away in Florida, site of Space Shuttle Atlantis? scheduled STS-125 launch to service the Hubble Space Telescope. Liftoff was on time at 2:01 p.m. (EDT) on May 11, 2009 from launch pad 39A at NASA's Kennedy Space Center.
Integrated orbital servicing study follow-on. Volume 3: Engineering test unit and controls
NASA Technical Reports Server (NTRS)
1978-01-01
A one-g servicing demonstration system which can be used to investigate and develop, in a real time hands-on situation, a wide variety of the mechanism and control system aspects of orbital servicing in the form of module exchange is described including the engineering test unit and the servicer servo drive console. A series of recommendations for future work is given concerning the control problem and more efficient module exchanges, mechanical elements, and electronics.
Photographic Equipment Test System (PETS)
NASA Technical Reports Server (NTRS)
1975-01-01
The Photographic Equipment Test System is presented. The device is a mobile optical system designed for evaluating performance of various sensors in a laboratory, in a vacuum chamber or on a flight line. The carriage is designed to allow elevation as well as azimuth control of the direction of the light from the collimator. The pneumatic tires provide an effective vibration isolation system. A target/illumination system is mounted on a motor driven linear slide, and focusing and exposure control can be operated remotely from the small electronics control console.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25111 (16 August 2001) --- Flight directors John Shannon (left foreground), Kelly Beck, and Steve Stich monitor the data displayed at their consoles in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, STS-105 mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of the two scheduled space walks to perform work on the International Space Station (ISS).
The 3D Human Motion Control Through Refined Video Gesture Annotation
NASA Astrophysics Data System (ADS)
Jin, Yohan; Suk, Myunghoon; Prabhakaran, B.
In the beginning of computer and video game industry, simple game controllers consisting of buttons and joysticks were employed, but recently game consoles are replacing joystick buttons with novel interfaces such as the remote controllers with motion sensing technology on the Nintendo Wii [1] Especially video-based human computer interaction (HCI) technique has been applied to games, and the representative game is 'Eyetoy' on the Sony PlayStation 2. Video-based HCI technique has great benefit to release players from the intractable game controller. Moreover, in order to communicate between humans and computers, video-based HCI is very crucial since it is intuitive, easy to get, and inexpensive. On the one hand, extracting semantic low-level features from video human motion data is still a major challenge. The level of accuracy is really dependent on each subject's characteristic and environmental noises. Of late, people have been using 3D motion-capture data for visualizing real human motions in 3D space (e.g, 'Tiger Woods' in EA Sports, 'Angelina Jolie' in Bear-Wolf movie) and analyzing motions for specific performance (e.g, 'golf swing' and 'walking'). 3D motion-capture system ('VICON') generates a matrix for each motion clip. Here, a column is corresponding to a human's sub-body part and row represents time frames of data capture. Thus, we can extract sub-body part's motion only by selecting specific columns. Different from low-level feature values of video human motion, 3D human motion-capture data matrix are not pixel values, but is closer to human level of semantics.
Flight directors at JSC MCC Bldg 30 monitor STS-30 prelaunch activities
1989-05-04
Only moments away from ignition, Atlantis, Orbiter Vehicle (OV) 104, and its five member crew are the subjects of concern drawing serious countenance in this scene in the Flight Control Room (FCR) of JSC's Mission Control Center (MCC) Bldg 30. Ascent Flight Director Alan L. Briscoe, monitors the Kennedy Space Center pre-launch activity from the flight director (FD) console, along with Ronald D. Dittemore (center) and N. Wayne Hale, Jr.
JSC officials in MCC Bldg 30 monitor STS-26 Discovery, OV-103, activity
1988-10-03
JSC officials, laughing, listen to crewmembers' commentary onboard Discovery, Orbiter Vehicle (OV) 103, during STS-26. In the Flight Control Room (FCR) of JSC's Mission Control Center (MCC) Bldg 30 and seated at the Mission Operations Directorate (MOD) console, MOD Director Eugene F. Kranz (foreground), wearing red, white and blue vest, smiles along with JSC Director Aaron Cohen and Flight Crew Operations Deputy Director Henry W. Hartsfield, Jr. (far right).
JSC Officials in MCC Bldg 30 monitor STS-26 Discovery, OV-103, activity
NASA Technical Reports Server (NTRS)
1988-01-01
JSC Officials, laughing, listen to crewmembers' commentary onboard Discovery, Orbiter Vehicle (OV) 103, during STS-26. In the Flight Control Room (FCR) of JSC's Mission Control Center (MCC) Bldg 30 and seated at the Mission Operations Directorate (MOD) console, MOD Director Eugene F. Kranz (foreground), wearing red, white and blue vest, smiles along with JSC Director Aaron Cohen and Flight Crew Operations Deputy Director Henry W. Hartsfield, Jr. (far right).
2011-03-26
JSC2011-E-029164 (26 March 2011) --- In the HTV mission control room at the Tsukuba Space Center in Japan, some colorful new decoration appeared atop several of the consoles. The origami cranes were distributed in the control rooms in both Houston and Japan. Meantime the Expedition 27 crew onboard the International Space Station joined them in paying tribute to the Japanese population who suffered from the March 11 earthquake and tsunami. Photo credit: Japan Aerospace Exploration Agency (JAXA)
1983-12-07
S82-33032 (30 June 1982) --- This scene shows activity at the spacecraft communicator and flight activities officer consoles in the mission operations control room (MOCR) in the Johnson Space Center?s mission control center (MCC). Astronaut Brewster H. Shaw Jr., right, Astronaut Roy D. Bridges Jr. and Marianne J. Dyson are pictured during STS-4?s Day 4 activity. Shaw and Bridges are spacecraft communicators and Dyson is a flight activities officer on the entry team.
Coverage of STS-104 Launch Coverage of Flight Controllers in MCC.
2001-07-12
JSC2001-E-21338 (12 July 2001) --- Robert Gest (left), with United Space Alliance (USA); Steven A. Hawley, deputy director of flight crew operations; and Alan L. (Lee) Briscoe, chief engineer for the Mission Operations Directorate, watch their monitors at the MOD console in the shuttle flight control room (WFCR) as the external tank oxygen vent hood is raised and retracted minutes prior to the launch of the Space Shuttle Atlantis.
BFCR during Expedition 6 space walk on ISS
2003-01-15
JSC2003-E-02167 (15 January 2003) --- Astronaut Stanley G. Love, spacecraft communicator (CAPCOM), monitors data at his console in the station flight control room (BFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, astronauts Kenneth D. Bowersox and Donald R. Pettit, Expedition Six mission commander and NASA ISS science officer, respectively, were participating in the missions only scheduled session of extravehicular activity (EVA).
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-752] Certain Gaming and Entertainment Consoles, Related Software, and Components Thereof; Notice of Commission Determination To Review a Final Initial Determination Finding a Violation of Section 337; Remand of the Investigation to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
... for the wireless connectivity via the CoLo Console \\6\\ and would be subject to a one-year minimum lock...\\ The ``CoLo Console'' is a web-based ordering tool NASDAQ offers to enable members to place colocation...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
... users using the Co-Lo Console \\4\\ on or after July 1, 2013 through August 31, 2013. The reduced fee... reduction in co-location cabinet fees). \\4\\ The ``Co-Lo Console'' is NASDAQ's web-based ordering tool, and...
View of Mission Control Center during the Apollo 13 emergency return
1970-04-16
S70-35368 (16 April 1970) --- Overall view showing some of the feverish activity in the Mission Operations Control Room (MOCR) of the Mission Control Center (MCC) during the final 24 hours of the problem-plagued Apollo 13 mission. Here, flight controllers and several NASA/MSC officials confer at the flight director's console. When this picture was made, the Apollo 13 lunar landing had already been canceled, and the Apollo 13 crewmembers were in trans-Earth trajectory attempting to bring their crippled spacecraft back home.
STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30
NASA Technical Reports Server (NTRS)
1988-01-01
STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). Front row of consoles with Propulsion Engineer (PROP) and Guidance, Navigation, and Control Systems Engineer (GNC) are visible in the foreground. CBS television camera personnel record front visual displays (orbital chart and data) for '48 Hours' program to be broadcast at a later date. The integrated simulation involved communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.
STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30
NASA Technical Reports Server (NTRS)
1988-01-01
STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). Director of Mission Operations Directorate (MOD) Eugene F. Kranz (left) and Chief of the Flight Directors Office Tommy W. Holloway monitor activity during the simulation. The two are at their normal stations on the rear row of consoles. The integrated simulation involves MCC flight controllers communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.
Shipboard Calibration Network Extension Utilizing COTS Products
2014-09-01
to emulate the MCS system console. C. KEYBOARD VIDEO AND MOUSE (KVM) SWITCH A ServSwitch Wizard IP Plus KVM switch is used to allow remote access...9 C. KEYBOARD VIDEO AND MOUSE (KVM) SWITCH .......................... 10 D. ROUTER...mechanical, and electrical KVM Keyboard Video and Mouse LAN Local Area Network MCS Machinery Control Systems NIST National Institute of Standards and
The evolution of the ISOLDE control system
NASA Astrophysics Data System (ADS)
Jonsson, O. C.; Catherall, R.; Deloose, I.; Drumm, P.; Evensen, A. H. M.; Gase, K.; Focker, G. J.; Fowler, A.; Kugler, E.; Lettry, J.; Olesen, G.; Ravn, H. L.; Isolde Collaboration
The ISOLDE on-line mass separator facility is operating on a Personal Computer based control system since spring 1992. Front End Computers accessing the hardware are controlled from consoles running Microsoft Windows ™ through a Novell NetWare4 ™ local area network. The control system is transparently integrated in the CERN wide office network and makes heavy use of the CERN standard office application programs to control and to document the running of the ISOLDE isotope separators. This paper recalls the architecture of the control system, shows its recent developments and gives some examples of its graphical user interface.
The evolution of the ISOLDE control system
NASA Astrophysics Data System (ADS)
Jonsson, O. C.; Catherall, R.; Deloose, I.; Evensen, A. H. M.; Gase, K.; Focker, G. J.; Fowler, A.; Kugler, E.; Lettry, J.; Olesen, G.; Ravn, H. L.; Drumm, P.
1996-04-01
The ISOLDE on-line mass separator facility is operating on a Personal Computer based control system since spring 1992. Front End Computers accessing the hardware are controlled from consoles running Microsoft Windows® through a Novell NetWare4® local area network. The control system is transparently integrated in the CERN wide office network and makes heavy use of the CERN standard office application programs to control and to document the running of the ISOLDE isotope separators. This paper recalls the architecture of the control system, shows its recent developments and gives some examples of its graphical user interface.
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. CAMERA FACING SOUTH INTO ETR ELECTRICAL BUILDING (TRA-648). INL NEGATIVE NO. HD46-20-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-752] Certain Gaming and Entertainment Consoles, Related Software, and Components Thereof; Notice of Request for Statements on the Public Interest AGENCY: U.S. International Trade Commission. ACTION: Notice. SUMMARY: Notice is hereby given that the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... cabinets ordered by users using the Co-Lo Console \\4\\ on or after October 1, 2013 through December 31, 2013... No. 68624 (Jan. 1, 2013), 78 FR 3945 (Jan. 17, 2013). \\4\\ The ``Co-Lo Console'' is NASDAQ's Web-based...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... receive the waiver of the installation fee: 1. The new cabinet order must be placed in the CoLo Console \\4\\ during the designated period; and \\4\\ The ``CoLo Console'' is a Web-based ordering tool that is utilized...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... receive the waiver of the installation fee: 1. the new cabinet order must be placed in the CoLo Console \\4\\ during the designated period; and \\4\\ The ``CoLo Console'' is Web-based ordering tool that is utilized by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linstadt, E.
1985-10-01
The COW, or Console On Wheels, is the primary operator interface to the SLC accelerator control system. A hardware and software description of the COW, a microcomputer based system with a color graphics display output and touchpanel and knob inputs, is given. The ease of development and expandability, due to both the modular nature of the hardware and the multitasking, interrupt driven software running in the COW, are described. Integration of the COW into the SLCNET communications network and SLC Control system is detailed.
NASA Technical Reports Server (NTRS)
1990-01-01
The Multi-Compatible Network Interface Unit (MCNIU) is intended to connect the space station's communications and tracking, guidance and navigation, life support, electric power, payload data, hand controls, display consoles and other systems, and also communicate with diverse processors. Honeywell is now marketing MCNIU commercially. It has applicability in certain military operations or civil control centers. It has nongovernment utility among large companies, universities and research organizations that transfer large amounts of data among workstations and computers. *This product is no longer commercially available.
Orbital fatigue tester for use in Skylab experiment T032
NASA Technical Reports Server (NTRS)
Sandorff, P. E.
1973-01-01
A prototype fatigue test machine is described which is suitable for use by an astronaut in conducting constant amplitude materials fatigue tests aboard a Skylab or space shuttle vehicle. The machine is comparised of a mechanical tester, which would be passed through a small (7.6-inch square) airlock to be supported in the space environment on an extendible boom, and a control console, which would provide remote control from within the space vehicle.
VIew of Mission Control on first day of ASTP docking in Earth orbit
1975-07-15
S75-28483 (15 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center on the first day of the Apollo-Soyuz Test Project docking mission in Earth orbit. The American ASTP flight controllers at NASA's Johnson Space Center were monitoring the progress of the Soviet ASTP launch when this photograph was taken. The television monitor shows cosmonaut Yuri V. Romanenko at his spacecraft communicator?s console in the ASTP mission control center in the Soviet Union. The American ASTP liftoff followed the Soviet ASTP launch by seven and one-half hours.
ETR, TRA642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTORGENERATOR ...
ETR, TRA-642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTOR-GENERATOR SETS AND OTHER ELECTRICAL EQUIPMENT. PHILLIPS PETROLEUM COMPANY ETR-D-1781, 7/1960. INL INDEX NO. 532-0642-00-706-020384, REV. 1. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Modified and improved sleep monitoring display console
NASA Technical Reports Server (NTRS)
Frost, J. D., Jr.
1972-01-01
An outline is given of a sleep monitoring display console capable of simultaneously displaying: (1) the visible current sleep stage of each subject, (2) a cumulative, numerical display (in hours and minutes) of the total amount of time the subject spends in each stage, and (3) a stepwise, graphic recording of subject's sleep stage versus time.
Lending Video Game Consoles in an Academic Library
ERIC Educational Resources Information Center
Buller, Ryan
2017-01-01
This paper will outline the process and discussions undertaken at the University of Denver's University Libraries to implement a lending service providing video game consoles. Faculty and staff at the University Libraries decided to pursue the new lending service, though not a traditional library offering, to support the needs of a video game…
37. View of detection radar environmental display (DRED) console for ...
37. View of detection radar environmental display (DRED) console for middle DR 2 (structure no. 736) antenna, located in MWOC facility. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. SOUTH SIDE ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. SOUTH SIDE OF ETR REACTOR, CAMERA FACING NORTH. CABINET CONTAINING "NUCLEAR INSTRUMENT SYSTEMS" IS RESTRICTED. INL NEGATIVE NO. HD46-18-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Wii have a problem: a review of self-reported Wii related injuries.
Sparks, Dorothy; Chase, Daniel; Coughlin, Lisa
2009-01-01
The increasing popularity of the Wii video game console has been associated with a number of gameplay related traumas. We sought to investigate if there were any identifiable injury patterns associated with Wii use. Utilising a database of self-reported Wii related injuries, the data was categorised by type of injury and game title being played at the time of injury. We found that of 39 reported Wii related injuries over a two-year span, 46% occurred while playing the Wii Sports Tennis software. Further, we identified 14 distinct injury patterns sustained during gameplay. Of these injuries, hand lacerations were the most common, accounting for 44% of the total number of reported cases. Injury associated with video game play is not unique to the Wii, nor is it a new phenomenon. However, the Wii console appears to have a higher rate of associated injuries than traditional game consoles because of its unique user interface. We review the literature and discuss some of the medical complications associated with the Wii and other video game consoles.
The effects of platform motion and target orientation on the performance of trackball manipulation.
Yau, Yi-Jan; Chao, Chin-Jung; Feng, Wen-Yang; Hwang, Sheue-Ling
2011-08-01
The trackball has been widely employed as a control/command input device on moving vehicles, but few studies have explored the effects of platform motion on its manipulation. Fewer still have considered this issue in designing the user interface and the arrangement of console location and orientation simultaneously. This work describes an experiment carried out to investigate the performance of trackball users on a simple point-and-click task in a motion simulator. By varying the orientation of onscreen targets, the effect of cursor movement direction on performance is investigated. The results indicate that the platform motion and target orientation both significantly affect the time required to point and click, but not the accuracy of target selection. The movement times were considerably longer under rolling and pitching motions and for targets located along the diagonal axes of the interface. Subjective evaluations carried out by the participants agree with these objective results. These findings could be used to optimise console and graphical menu design for use on maritime vessels. STATEMENT OF RELEVANCE: In military situations, matters of life or death may be decided in milliseconds. Any delay or error in classification and identification will thus affect the safety of the ship and its crew. This study demonstrates that performance of manipulating a trackball is affected by the platform motion and target orientation. The results of the present study can guide the arrangement of consoles and the design of trackball-based graphical user interfaces on maritime vessels.
7. Photographic copy of construction drawing, dated December 13, 1967, ...
7. Photographic copy of construction drawing, dated December 13, 1967, Department of the Air Force, Air Defense Command, Civil Engineering, Selfridge, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. GEEIA CONSOLE SUPPORT CONTROL TOWER BUILDING 559, SECTIONS, ELEVATIONS. - Selfridge Field, Building No. 559, South of East Joy Boulevard, east of North-South Runway, Mount Clemens, Macomb County, MI
Launch of Space Shuttle Atlantis / STS-129 Mission
2009-11-16
STS129-S-055 (16 Nov. 2009) --- The space shuttle launch team monitors the progress of Space Shuttle Atlantis' countdown from consoles on the main floor of Firing Room 4 in Kennedy's Launch Control Center. Liftoff of Atlantis from Launch Pad 39A on its STS-129 mission to the International Space Station came at 2:28 p.m. (EST) Nov. 16, 2009.
Bagattoni, Simone; D'Alessandro, Giovanni; Sadotti, Agnese; Alkhamis, Nadia; Piana, Gabriela
2018-01-01
Audiovisual distraction using video eyeglasses is useful in managing distress and reducing fear and anxiety in healthy children during dental treatments. To evaluate the effect of audiovisual distraction on behavior and self-reported pain of children with special healthcare needs (SHCN) without intellectual disability during dental restorations and its influence on the operator stress and the time of the appointment. This randomized controlled crossover trial comprised 48 children with SHCN requiring at least two dental restorations. One restoration was done wearing the video eyeglasses and one wearing conventional behavior management techniques. Subjective and objective pain was evaluated using the Faces Pain Scale - Revised (FPS-R) and the revised Face, Leg, Activity, Cry, and Consolability scale (r-FLACC). The operator stress using a VAS, the time of the appointment, and the child satisfaction were recorded. The use of video eyeglasses significantly reduced the operator stress. The bivariate analysis showed that the mean FPS-R score and the mean r-FLACC score were significantly lower using the video eyeglasses only during the second clinical session. Audiovisual distraction could be useful in managing distress in SHCN children without intellectual disability but cannot replace the conventional behavior management techniques. © 2017 BSPD, IAPD and John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Advanced figure sensor operations and maintenance manual
NASA Technical Reports Server (NTRS)
Robertson, H. J.
1972-01-01
This manual contains procedures for installing, operating, and maintaining the optical figure sensor and its associated electronic controls. The optical figure sensor, a system of integrated components, comprises: (1) a phase measuring modified interferometer employing a single frequency 6328 A laser, and a Vidissector; (2) a two-axis automatic thermal compensation control mount; (3) a five degree of freedom manual adjustment stand; and (4) a control console. This instrument provides real time output data of optical figure errors for spherical mirrors, and is also capable of measuring aspherical mirrors if a null corrector is added.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25123 (16 August 2001) --- Astronauts Joseph R. Tanner (left) and Steve MacLean, both STS-105 spacecraft communicators (CAPCOM), discuss the progress of the extravehicular activity at their consoles in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). At the time this photo was taken, mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of two scheduled space walks during Discoverys voyage to the International Space Station (ISS). MacLean represents the Canadian Space Agency.
ERIC Educational Resources Information Center
Main, Susan; O'Rourke, John
2011-01-01
This paper reports on a pilot study that compared the use of commercial off-the-shelf (COTS) handheld game consoles (HGCs) with traditional teaching methods to develop the automaticity of mathematical calculations and self-concept towards mathematics for year 4 students in two metropolitan schools. One class conducted daily sessions using the HGCs…
35. View of data and analysis console (DAC), located in ...
35. View of data and analysis console (DAC), located in MWOC facility in transmitter building no. 102, showing clock and missile impact predictor time. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
HoloHands: games console interface for controlling holographic optical manipulation
NASA Astrophysics Data System (ADS)
McDonald, C.; McPherson, M.; McDougall, C.; McGloin, D.
2013-03-01
The increasing number of applications for holographic manipulation techniques has sparked the development of more accessible control interfaces. Here, we describe a holographic optical tweezers experiment which is controlled by gestures that are detected by a Microsoft Kinect. We demonstrate that this technique can be used to calibrate the tweezers using the Stokes drag method and compare this to automated calibrations. We also show that multiple particle manipulation can be handled. This is a promising new line of research for gesture-based control which could find applications in a wide variety of experimental situations.
View of Mission Control Center during Apollo 13 splashdown
1970-04-17
S70-35471 (17 April 1970) --- Two flight controllers man consoles in the Missions Operations Control Room (MOCR) of the Mission Control Center (MCC) at the Manned Spacecraft Center (MSC), Houston, Texas, just before splashdown occurred in the south Pacific Ocean. Though the MOCR does not appear to be crowded in this photo, there was a very large crowd of persons on hand for the splashdown and recovery operations coverage. Most of the group crowded around in the rear of the room. Apollo 13 splashdown occurred at 12:07:44 p.m. (CST), April 17, 1970.
1969-05-19
S69-34038 (18 May 1969) --- View of activity at the flight director's console in the Mission Operations Control Room in the Mission Control Center, Building 30, on the first day of the Apollo 10 lunar orbit mission. Seated are Gerald D. Griffin (foreground) and Glynn S. Lunney, Shift 1 (Black Team) flight directors. Milton L. Windler, standing behind them, is the flight director of Shift 2 (Maroon Team). In the center background, standing, is Dr. Christopher C. Kraft Jr., MSC Director of Flight Operations.
2010-04-01
failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE APR 2010 2. REPORT...The second is a ‘mechanical’ part that is controlled by circuit boards and is accessible by the technician via the serial console and running...was the use of conventional remote access solution designed for telecommuters or teleworkers in the Information Technology (IT) world, such as a
A Simulation Analysis of an Automated Identification Processor for the Tactical Air Control System.
1986-06-01
available at the work station for the M&I operators to identify aircraft. Some data is provided via the console such as the IFF/SIF and the airspace control...factors led to the development of efficient work stations for the functional positions in the air defense mission. Experimental Design Experiments are...techniques that helped keep the thesis work "on track"! The Research Design The research plan or design of this thesis effort is not unique. In fact
1997-01-17
SHOWDirect Control Systems (6) Betacam SP Players (Video Backup) (6) Betacam SP Recorders (Show Record) (2) CRV Laser Disc Rec/Players (GoTo) (14) Multi...IK Scoops (3)lKDP’s (1) Schedule 40 Light Pole (Flown) Control Console Dimming Cables & Distribution PRODUCTION HARDWARE (1) Sony Betacam SP...Shooters Package (1) Folsom Hi-Res Video Scan Converter (20) Betacam SP VideoTapes STAGING HARDWARE (1) Custom Screen Divider / Support 44 This
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linstadt, E.
1985-04-01
The COW, or Console On Wheels, is the primary operator interface to the SLC accelerator control system. A hardware and software description of the COW, a microcomputer based system with a color graphics display output and touch-panel and knob inputs, is given. The ease of development and expandability, due to both the modular nature of the hardware and the multitasking, interrupt driven software running in the COW, are described. Integration of the COW into the SLCNET communications network and SLC Control system is detailed.
View of activity in Mission Control Center during Apollo 15 EVA
1971-08-02
S71-41852 (2 Aug. 1971) --- Gerald D. Griffin, foreground, stands near his console in the Mission Operations Control Room (MOCR) during Apollo 15's third extravehicular activity (EVA) on the lunar surface. Griffin is Gold Team (Shift 1) flight director for the Apollo 15 mission. Astronauts David R. Scott and James B. Irwin can be seen on the large screen at the front of the MOCR as they participate in sample-gathering on the lunar surface.
Flair-fleet location and information reporting
NASA Technical Reports Server (NTRS)
Norman, E. R.; Dunlap, M. E.
1974-01-01
The FLAIR system, as now produced, automatically updates each vehicle's location and corresponding officer's status once each two seconds and presents this information to police dispatchers in the command and control center. The position of all vehicles available for assignment is displayed on a color video map at each dispatcher's console to an accuracy of 50 feet. This gives the dispatcher a continuous picture of the deployment of the total available force and thus complete command and control of all police under his responsibility.
STS-3 MISSION OPERATIONS CONTROL ROOM (MOCR) - JSC
1982-03-26
Mission Control Activities during the STS-3 Mission, Day-4 with: Maj. Gen. James A. Abrahamson, Associate Administrator of the Space Transportation System (STS), NASA Hdqs., conversing with Dr. Kraft; Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC, Aaron Cohen, Manager, Space Shuttle Orbiter Project Office; and, J. E. Conner, Ford Aerospace Engineer at the Instrumentation and Communications Officer (INCO) Console position. 1. Glynn S. Lunney 2. Major General James A. Abrahamson 3. Aaron Cohen 4. J. E. Conner 5. Dr. Christopher Kraft JSC, Houston, TX
Report on a Cooperative Programme on Active Flutter Suppression,
1980-08-01
soufflerie 16 pieds au frilon de is NASA A Langley Field. La maquette et les essais 6taient sous la responsabilitg de is firma Northrop (Fig. 1). Du c...ATLANTIC TREATY ORGANIZATION ADVISORY GROUP FOR AEROSPACE RESEARCH AND DEVELOPMENT (ORGANISATION DU TRAITE DE L’ATLANTIQUE NORD) A(ARI) Report No.689 REPORT...power unit was added to the console to provide for start/stop and bypass control of this unit from the wind tunnel control room. THE FLUTTER DETECTOR AND
Yukich, Joshua O; Briët, Olivier J T; Ahorlu, Collins K; Nardini, Peter; Keating, Joseph
2017-08-07
Long-lasting insecticidal nets (LLINs) are one of the main interventions recommended by the World Health Organization for malaria vector control. LLINs are ineffective if they are not being used. Subsequent to the completion of a cluster randomized cross over trial conducted in rural Greater Accra where participants were provided with the 'Bɔkɔɔ System'-a set of solar powered net fan and light consoles with a solar panel and battery-or alternative household water filters, all trial participants were invited to participate in a Becker-DeGroot-Marschak auction to determine the mean willingness to pay (WTP) for the fan and light consoles and to estimate the demand curve for the units. Results demonstraed a mean WTP of approximately 55 Cedis (~13 USD). Demand results suggested that at a price which would support full manufacturing cost recovery, a majority of households in the area would be willing to purchase at least one such unit.
NASA Technical Reports Server (NTRS)
Junge, M. K.; Giacomi, M. J.
1981-01-01
The results of a human factors test to assay the suitability of a prototype general purpose work station (GPWS) for biosciences experiments on the fourth Spacelab mission are reported. The evaluation was performed to verify that users of the GPWS would optimally interact with the GPWS configuration and instrumentation. Six male subjects sat on stools positioned to allow assimilation of the zero-g body posture. Trials were run concerning the operator viewing angles facing the console, the console color, procedures for injecting rates with dye, a rat blood cell count, mouse dissection, squirrel monkey transfer, and plant fixation. The trials were run for several days in order to gage improvement or poor performance conditions. Better access to the work surface was found necessary, together with more distinct and better located LEDs, better access window latches, clearer sequences on control buttons, color-coded sequential buttons, and provisions made for an intercom system when operators of the GPWS work in tandem.
Processing the CONSOL Energy, Inc. Mine Maps and Records Collection at the University of Pittsburgh
ERIC Educational Resources Information Center
Rougeux, Debora A.
2011-01-01
This article describes the efforts of archivists and student assistants at the University of Pittsburgh's Archives Service Center to organize, describe, store, and provide timely and efficient access to over 8,000 maps of underground coal mines in southwestern Pennsylvania, as well the records that accompanied them, donated by CONSOL Energy, Inc.…
Remarks on forensically interesting Sony Playstation 3 console features
NASA Astrophysics Data System (ADS)
Daugs, Gunnar; Kröger, Knut; Creutzburg, Reiner
2012-02-01
This paper deals with forensically interesting features of the Sony Playstation 3 game console. The construction and the internal structure are analyzed more precisely. Interesting forensic features of the operating system and the file system are presented. Differences between a PS3 with and without jailbreak are introduced and possible forensic attempts when using an installed Linux are discussed.
77 FR 46715 - Large Residential Washers From the Republic of Korea: Amendment to the Scope of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... contains payment system electronics; \\12\\ (b) it is configured with an externally mounted steel frame at... distinct washing and drying machines that are built on a unitary frame and share a common console that... wash cycle setting; and (d) the console containing the user interface is made of steel and is assembled...
Your Parents Were Right, Scholars Say: More Studying Leads to Better Grades
ERIC Educational Resources Information Center
Glenn, David
2007-01-01
According to a paper released by the National Bureau of Economic Research, first-year college students who are assigned roommates with video-game consoles study 40 minutes less per day, on average, than first-year students whose roommates did not bring consoles. And that reduction in study time has a sizable effect on grades: First-year students…
1970-01-01
This 1970 photograph shows the flight unit for Skylab's White Light Coronagraph, an Apollo Telescope Mount (ATM) facility that photographed the solar corona in the visible light spectrum. A TV camera in the instrument provided real-time pictures of the occulted Sun to the astronauts at the control console and also transmitted the images to the ground. The Marshall Space Flight Center had program management responsibility for the development of Skylab hardware and experiments.
NASA Astrophysics Data System (ADS)
Deloose, I.; Pace, A.
1994-12-01
The two CERN isotope separators named ISOLDE have been running on the new Personal Computer (PC) based control system since April 1992. The new architecture that makes heavy use of the commercial software and hardware of the PC market has been implemented on the 1700 geographically distributed control channels of the two separators and their experimental area. Eleven MSDOS Intel-based PCs with approximately 80 acquisition and control boards are used to access the equipment and are controlled from three PCs running Microsoft Windows used as consoles through a Novell Local Area Network. This paper describes the interesting solutions found and discusses the reduced programming workload and costs that have been obtained.
ERIC Educational Resources Information Center
O'Rourke, John; Main, Susan; Ellis, Michelle
2013-01-01
Games technology in the form of hand-held game consoles (HGCs) when focussed on specific academic skill development has the capacity to engage students in learning and in turn produce positive academic results. This current research explores teacher perceptions of the implementation of HGCs to enhance the development of mental maths skills (namely…
Astronaut Richard H. Truly in training session RMS for STS-2 bldg 9A
NASA Technical Reports Server (NTRS)
1981-01-01
Astronaut Richard H. Truly in training session with the Remote Manipulator System (RMS) for STS-2 bldg 9A. Views show Truly working at the command console while watching out the windows. Karen Ehlers, an RMS procedures specialist, can be seen at left side of frame (34314); view from behind Truly as he trains at the RMS console (34315).
Documentary views of Flight Director and Controller activity during STS-2
1981-11-12
S81-39431 (12 Nov. 1981) --- Eugene F. Kranz, left, and Dr. Christopher C. Kraft Jr. monitor data displayed on the FOD console in the mission operations control room (MOCR) in the Johnson Space Center?s mission control center following the successful launch of the Columbia, and the beginning of NASA?s second space shuttle mission. Dr. Kraft is director of the Johnson Space Center and Kranz is deputy director of the flight operations directorate (FOD) at JSC. Houston time for the launch was approximately 9:10 a.m., Nov 12, 1981. Photo credit: NASA
NASA Technical Reports Server (NTRS)
Mcpeak, W. L.
1975-01-01
A new exciter switch assembly has been installed at the three DSN 64-m deep space stations. This assembly provides for switching Block III and Block IV exciters to either the high-power or 20-kW transmitters in either dual-carrier or single-carrier mode. In the dual-carrier mode, it provides for balancing the two drive signals from a single control panel located in the transmitter local control and remote control consoles. In addition to the improved switching capabilities, extensive monitoring of both the exciter switch assembly and Transmitter Subsystem is provided by the exciter switch monitor and display assemblies.
View of Mission Control Center during the Apollo 13 oxygen cell failure
1970-04-14
S70-34904 (14 April 1970) --- Astronaut Alan B. Shepard Jr., prime crew commander of the Apollo 14 mission, monitors communications between the Apollo 13 spacecraft and Mission Control Center. He is seated at a console in the Mission Operations Control Room of the MCC, Manned Spacecraft Center. The main concern of the moment was action taken by the three Apollo 13 crewmen - astronauts James A. Lovell Jr., John L. Swigert Jr. and Fred W. Haise Jr. - to make corrections inside the spacecraft following discovery of an oxygen cell failure several hours earlier.
Controlling multiple security robots in a warehouse environment
NASA Technical Reports Server (NTRS)
Everett, H. R.; Gilbreath, G. A.; Heath-Pastore, T. A.; Laird, R. T.
1994-01-01
The Naval Command Control and Ocean Surveillance Center (NCCOSC) has developed an architecture to provide coordinated control of multiple autonomous vehicles from a single host console. The multiple robot host architecture (MRHA) is a distributed multiprocessing system that can be expanded to accommodate as many as 32 robots. The initial application will employ eight Cybermotion K2A Navmaster robots configured as remote security platforms in support of the Mobile Detection Assessment and Response System (MDARS) Program. This paper discusses developmental testing of the MRHA in an operational warehouse environment, with two actual and four simulated robotic platforms.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25125 (16 August 2001) --- Flight directors John Shannon (left foreground) and Kelly Beck watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC) along with astronauts Joseph R. Tanner (left background) and Steve MacLean, STS-105 spacecraft communicators (CAPCOM). At the time this photo was taken, mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of two scheduled space walks during Discoverys visit to the International Space Station (ISS). MacLean represents the Canadian Space Agency.
2014-01-01
Background Existing instruments for measuring problematic computer and console gaming and internet use are often lengthy and often based on a pathological perspective. The objective was to develop and present a new and short non-clinical measurement tool for perceived problems related to computer use and gaming among adolescents and to study the association between screen time and perceived problems. Methods Cross-sectional school-survey of 11-, 13-, and 15-year old students in thirteen schools in the City of Aarhus, Denmark, participation rate 89%, n = 2100. The main exposure was time spend on weekdays on computer- and console-gaming and internet use for communication and surfing. The outcome measures were three indexes on perceived problems related to computer and console gaming and internet use. Results The three new indexes showed high face validity and acceptable internal consistency. Most schoolchildren with high screen time did not experience problems related to computer use. Still, there was a strong and graded association between time use and perceived problems related to computer gaming, console gaming (only boys) and internet use, odds ratios ranging from 6.90 to 10.23. Conclusion The three new measures of perceived problems related to computer and console gaming and internet use among adolescents are appropriate, reliable and valid for use in non-clinical surveys about young people’s everyday life and behaviour. These new measures do not assess Internet Gaming Disorder as it is listed in the DSM and therefore has no parity with DSM criteria. We found an increasing risk of perceived problems with increasing time spent with gaming and internet use. Nevertheless, most schoolchildren who spent much time with gaming and internet use did not experience problems. PMID:24731270
SKYLAB III - POSTLAUNCH (MISSION CONTROL CENTER [MCC]) - JSC
1973-08-06
S73-31964 (5 August 1973) --- This group of flight controllers discuss today's approaching extravehicular activity (EVA) to be performed by the Skylab 3 crewmen. They are, left to right, scientist-astronaut Story Musgrave, a Skylab 3 spacecraft communicator; Robert Kain and Scott Millican, both of the Crew Procedures Division, EVA Procedures Section; William C. Schneider, Skylab Program Director, NASA Headquarters; and Milton Windler, flight director. Windler points to the model of the Skylab space station cluster to indicate the location of the ATM's film magazines. The group stands near consoles in the Mission Operations Control Room (MOCR) of the JSC Mission Control Center (MCC). Photo credit: NASA
Control of a 30 cm diameter mercury bombardment thruster
NASA Technical Reports Server (NTRS)
Terdan, F. F.; Bechtel, R. T.
1973-01-01
Increased thruster performance has made closed-loop automatic control more difficult than previously. Specifically, high perveance optics tend to make reliable recycling more difficult. Control logic functions were established for three automatic modes of operation of a 30-cm thruster using a power conditioner console with flight-like characteristics. The three modes provide (1) automatic startup to reach thermal stability, (2) steady-state closed-loop control, and (3) the reliable recycling of the high voltages following an arc breakdown to reestablish normal operation. Power supply impedance characteristics necessary for stable operation and the effect of the magnetic baffle on the reliable recycling was studied.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
NASA Launch Director Charlie Blackwell-Thompson at her console in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
Precision Stellar Catalogs and the Role of Anomalous Refraction.
1978-01-01
program to evaluate the use of Two Color Refractometry (TCR) for the determination of precise stel- lar positions is discussed. Various aspects of...Display Control Console Most of the electronic subsystems which are required to perform the various functions for the Two Color Refractometry are...development of the Two-Color Refractometry System. To this end, we are performing Two-Color Refractometry evaluations on components similar to those to be
Mission control activity during STS-61 EVA-2
1993-12-05
STS61-S-094 (5 Dec 1993) --- Kyle Herring, second left, illustrates a point during mission commentary for the second Extravehicular Activity (EVA-2) of the STS-61 Hubble Space Telescope (HST) servicing mission. Astronaut Jerry L. Ross (center), a space walker on two previous NASA shuttle missions, amplified Herring's explanations. At the flight surgeon's console is Dr. Klaus Lohn (third right) of the Institute for Flight Medicine in Koln, Germany.
2001-04-19
JSC2001-E-12125 (19 April 2001) --- Astronauts Mark L. Polansky, from the left, Christopher J. (Gus) Loria, and Scott D. Altman discuss the approaching STS-100 launch at their positions at the Spacecraft Communicator console in Houston's Mission Control Center (MCC). Loria's position addresses weather issues, of which there were few on this particular launch. He will also be assigned to weather matters for the entry phase of the flight.
Crew Training - STS-33/51L - JSC
1985-09-19
S85-40508 (23 Sept. 1985) --- Two women representing the Teacher-in-Space project undergo training in preparation for the STS-51L mission in two photographs made in Johnson Space Center trainers. Sharon Christa McAuliffe, named as prime crew citizen observer on the spaceflight, studies the console on the aft flight deck, which contains controls for the remote manipulator system (RMS) and other important functions. Photo credit: NASA
Western aeronautical test range real-time graphics software package MAGIC
NASA Technical Reports Server (NTRS)
Malone, Jacqueline C.; Moore, Archie L.
1988-01-01
The master graphics interactive console (MAGIC) software package used on the Western Aeronautical Test Range (WATR) of the NASA Ames Research Center is described. MAGIC is a resident real-time research tool available to flight researchers-scientists in the NASA mission control centers of the WATR at the Dryden Flight Research Facility at Edwards, California. The hardware configuration and capabilities of the real-time software package are also discussed.
1972-09-01
The Multiple Docking Adapter (MDA), designed and constructed under the direction of the Marshall Space Flight Center, was one of four principal sections comprising Skylab. The MDA provided the means by which the Command and Service Modules attached to the Skylab, enabling the crews to enter and work in it. Also included in the MDA was a control and display console for the Apollo Telescope Mount. This image shows an interior view of the MDA.
Training effectiveness of an intelligent tutoring system for a propulsion console trainer
NASA Technical Reports Server (NTRS)
Johnson, Debra Steele
1990-01-01
A formative evaluation was conducted on an Intelligent Tutoring System (ITS) developed for tasks performed on the Propulsion Console. The ITS, which was developed primarily as a research tool, provides training on use of the Manual Select Keyboard (MSK). Three subjects completed three phases of training using the ITS: declarative, speed, and automaticity training. Data were collected on several performance dimensions, including training time, number of trials performed in each training phase, and number of errors. Information was also collected regarding the user interface and content of training. Suggestions for refining the ITS are discussed. Further, future potential uses and limitations of the ITS are discussed. The results provide an initial demonstration of the effectiveness of the Propulsion Console ITS and indicate the potential benefits of this form of training tool for related tasks.
First Integrated Flight Simulation For STS 114
2004-10-13
JSC2004-E-45138 (13 October 2004) --- Astronaut Stephen N. Frick monitors communications at the spacecraft communicator (CAPCOM) console in the Shuttle Flight Control Room (WFCR) in Johnson Space Centers (JSC) Mission Control Center (MCC) with the STS-114 crewmembers during a fully-integrated simulation on October 13. The seven member crew was in a JSC-based simulator during the sims. The dress rehearsal of Discovery's rendezvous and docking with the International Space Station (ISS) was the first flight-specific training for the Space Shuttle's return to flight.
Cosmonaut Aleksey Leonov briefed on Apollo Communications test system console
1974-04-23
S74-20807 (23 April 1974) --- Cosmonaut Aleksey A. Leonov (foreground) is briefed on the Apollo communications test system console in the Building 440 laboratory during the joint U.S.-USSR Apollo-Soyuz Test Project training activity at the Johnson Space Center. Leonov is the commander of the Soviet ASTP crew. Leonov is being briefed by astronaut Thomas P. Stafford, commander of the American ASTP crew.
Remote console for virtual telerehabilitation.
Lewis, Jeffrey A; Boian, Rares F; Burdea, Grigore; Deutsch, Judith E
2005-01-01
The Remote Console (ReCon) telerehabilitation system provides a platform for therapists to guide rehabilitation sessions from a remote location. The ReCon system integrates real-time graphics, audio/video communication, private therapist chat, post-test data graphs, extendable patient and exercise performance monitoring, exercise pre-configuration and modification under a single application. These tools give therapists the ability to conduct training, monitoring/assessment, and therapeutic intervention remotely and in real-time.
ETR, TRA642. CONSOLE FLOOR. CAMERA IS ON WEST SIDE OF ...
ETR, TRA-642. CONSOLE FLOOR. CAMERA IS ON WEST SIDE OF FLOOR AND FACES NORTH. OUTER WALL OF STORAGE CANAL IS AT RIGHT. SHIELDING IS THICKER AT LOWER LEVEL, WHERE SPENT FUEL ELEMENTS WILL COOL AFTER REMOVAL FROM REACTOR. INL NEGATIVE NO. 56-1401. Jack L. Anderson, Photographer, 5/1/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
David Bushman at the Mission Manager's console onboard NASA's DC-8 during the AirSAR 2004 campaign
2004-03-03
David Bushman at the Mission Manager's console onboard NASA's DC-8 during the AirSAR 2004 campaign. AirSAR 2004 is a three-week expedition by an international team of scientists that will use an all-weather imaging tool, called the Airborne Synthetic Aperture Radar (AirSAR), in a mission ranging from the tropical rain forests of Central America to frigid Antarctica.
HMI conventions for process control graphics.
Pikaar, Ruud N
2012-01-01
Process operators supervise and control complex processes. To enable the operator to do an adequate job, instrumentation and process control engineers need to address several related topics, such as console design, information design, navigation, and alarm management. In process control upgrade projects, usually a 1:1 conversion of existing graphics is proposed. This paper suggests another approach, efficiently leading to a reduced number of new powerful process graphics, supported by a permanent process overview displays. In addition a road map for structuring content (process information) and conventions for the presentation of objects, symbols, and so on, has been developed. The impact of the human factors engineering approach on process control upgrade projects is illustrated by several cases.
A demonstration of a low cost approach to security at shipping facilities and ports
NASA Astrophysics Data System (ADS)
Huck, Robert C.; Al Akkoumi, Mouhammad K.; Herath, Ruchira W.; Sluss, James J., Jr.; Radhakrishnan, Sridhar; Landers, Thomas L.
2010-04-01
Government funding for the security at shipping facilities and ports is limited so there is a need for low cost scalable security systems. With over 20 million sea, truck, and rail containers entering the United States every year, these facilities pose a large risk to security. Securing these facilities and monitoring the variety of traffic that enter and leave is a major task. To accomplish this, the authors have developed and fielded a low cost fully distributed building block approach to port security at the inland Port of Catoosa in Oklahoma. Based on prior work accomplished in the design and fielding of an intelligent transportation system in the United States, functional building blocks, (e.g. Network, Camera, Sensor, Display, and Operator Console blocks) can be assembled, mixed and matched, and scaled to provide a comprehensive security system. The following functions are demonstrated and scaled through analysis and demonstration: Barge tracking, credential checking, container inventory, vehicle tracking, and situational awareness. The concept behind this research is "any operator on any console can control any device at any time."
Dosimetric changes with computed tomography automatic tube-current modulation techniques.
Spampinato, Sofia; Gueli, Anna Maria; Milone, Pietro; Raffaele, Luigi Angelo
2018-04-06
The study is aimed at a verification of dose changes for a computed tomography automatic tube-current modulation (ATCM) technique. For this purpose, anthropomorphic phantom and Gafchromic ® XR-QA2 films were used. Radiochromic films were cut according to the shape of two thorax regions. The ATCM algorithm is based on noise index (NI) and three exam protocols with different NI were chosen, of which one was a reference. Results were compared with dose values displayed by the console and with Poisson statistics. The information obtained with radiochromic films has been normalized with respect to the NI reference value to compare dose percentage variations. Results showed that, on average, the information reported by the CT console and calculated values coincide with measurements. The study allowed verification of the dose information reported by the CT console for an ATCM technique. Although this evaluation represents an estimate, the method can be a starting point for further studies.
Liu, May; Purohit, Shreya; Mazanetz, Joshua; Allen, Whitney; Kreaden, Usha S; Curet, Myriam
2018-01-01
Skill assessment during robotically assisted surgery remains challenging. While the popularity of the Global Evaluative Assessment of Robotics Skills (GEARS) has grown, its lack of discrimination between independent console skills limits its usefulness. The purpose of this study was to evaluate construct validity and interrater reliability of a novel assessment designed to overcome this limitation. We created the Assessment of Robotic Console Skills (ARCS), a global rating scale with six console skill domains. Fifteen volunteers who were console surgeons for 0 ("novice"), 1-100 ("intermediate"), or >100 ("experienced") robotically assisted procedures performed three standardized tasks. Three blinded raters scored the task videos using ARCS, with a 5-point Likert scale for each skill domain. Scores were analyzed for evidence of construct validity and interrater reliability. Group demographics were indistinguishable except for the number of robotically assisted procedures performed (p = 0.001). The mean scores of experienced subjects exceeded those of novices in dexterity (3.8 > 1.4, p < 0.001), field of view (4.1 > 1.8, p < 0.001), instrument visualization (3.9 > 2.2, p < 0.001), manipulator workspace (3.6 > 1.9, p = 0.001), and force sensitivity (4.3 > 2.6, p < 0.001). The mean scores of intermediate subjects exceeded those of novices in dexterity (2.8 > 1.4, p = 0.002), field of view (2.8 > 1.8, p = 0.021), instrument visualization (3.2 > 2.2, p = 0.045), manipulator workspace (3.1 > 1.9, p = 0.004), and force sensitivity (3.7 > 2.6, p = 0.033). The mean scores of experienced subjects exceeded those of intermediates in dexterity (3.8 > 2.8, p = 0.003), field of view (4.1 > 2.8, p < 0.001), and instrument visualization (3.9 > 3.2, p = 0.044). Rater agreement in each domain demonstrated statistically significant concordance (p < 0.05). We present strong evidence for construct validity and interrater reliability of ARCS. Our study shows that learning curves for some console skills plateau faster than others. Therefore, ARCS may be more useful than GEARS to evaluate distinct console skills. Future studies will examine why some domains did not adequately differentiate between subjects and applications for intraoperative use.
Payload Crew Training Complex (PCTC) utilization and training plan
NASA Technical Reports Server (NTRS)
Self, M. R.
1980-01-01
The physical facilities that comprise the payload crew training complex (PCTC) are described including the host simulator; experiment simulators; Spacelab aft flight deck, experiment pallet, and experiment rack mockups; the simulation director's console; payload operations control center; classrooms; and supporting soft- and hardware. The parameters of a training philosophy for payload crew training at the PCTC are established. Finally the development of the training plan is addressed including discussions of preassessment, and evaluation options.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
NASA Launch Director Charlie Blackwell-Thompson follows operations at her console in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
NASA Launch Director Charlie Blackwell-Thompson stands next to her console in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
Master console operator David Walsh monitors operations from his position in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
EM-1 Countdown Simulation with Charlie Blackwell-Thompson
2018-03-29
NASA Launch Director Charlie Blackwell-Thompson follows operations at her console in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission-1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.
2016-11-07
Inside the Heroes and Legends attraction at the Kennedy Space Center Visitor Complex, interactive features include the original consoles of the Mercury Mission Control room with the world map where capsules paths were followed between tracking stations. The new facility looks back to the pioneering efforts of Mercury, Gemini and Apollo. It sets the stage by providing the background and context for space exploration and the legendary men and women who pioneered the nation's journey into space.
2004-05-19
KENNEDY SPACE CENTER, FLA. -- Johnson Controls operator Kenny Allen works on the recently acquired Contraves-Goerz Kineto Tracking Mount (KTM). Trailer-mounted with a center console/seat and electric drive tracking mount, the KTM includes a two-camera, camera control unit that will be used during launches. The KTM is designed for remotely controlled operations and offers a combination of film, shuttered and high-speed digital video, and FLIR cameras configured with 20-inch to 150-inch focal length lenses. The KTMs are generally placed in the field and checked out the day before a launch and manned 3 hours prior to liftoff. There are 10 KTMs certified for use on the Eastern Range.
2004-05-19
KENNEDY SPACE CENTER, FLA. -- Johnson Controls operator Kenny Allen works on the recently acquired Contraves-Goerz Kineto Tracking Mount (KTM). Trailer-mounted with a center console/seat and electric drive tracking mount, the KTM includes a two-camera, camera control unit that will be used during launches. The KTM is designed for remotely controlled operations and offers a combination of film, shuttered and high-speed digital video, and FLIR cameras configured with 20-inch to 150-inch focal length lenses. The KTMs are generally placed in the field and checked out the day before a launch and manned 3 hours prior to liftoff. There are 10 KTMs certified for use on the Eastern Range.
Radiological Control Center (RADCC) Renaming Ceremony
2017-03-31
Consoles in the Radiological Control Center at NASA's Kennedy Space Center are seen during ceremonies to name the facility in honor of Randy Scott. A professional health physicist of more than 40 years, Scott served as the Florida spaceport's Radiation Protection Officer for 14 years until his death June 17, 2016. Located in the Neil Armstrong Operations and Checkout building, the Randall E. Scott Radiological Control Center is staffed by technical and radiological experts from NASA, the U.S. Department of Energy, the U.S. Air Force 45th Space Wing and the state of Florida. The group performs data collection and assessment functions supporting launch site and field data collection activities.
STS-105 coverage of Mission Control Center employees in the WFCR & BFCR
2003-03-25
JSC2001-E-25131 (16 August 2001) --- ISS flight director Mark Ferring (seated), assembly checkout officer (ACO) Jim Ruhnke and astronaut Stephanie D. Wilson, ISS spacecraft communicator (CAPCOM), discuss the progress of the extravehicular activities at their consoles in the station flight control room (BFCR) in Houstons Mission Control Center (MCC). Operations support officer (OSO) Ted Kenny is in the background participating in the discussion over the voice loops. At the time this photo was taken, mission specialists Daniel T. Barry and Patrick G. Forrester were performing the first of two scheduled space walks during Discoverys voyage to the International Space Station (ISS).
Techniques for designing rotorcraft control systems
NASA Technical Reports Server (NTRS)
Yudilevitch, Gil; Levine, William S.
1994-01-01
Over the last two and a half years we have been demonstrating a new methodology for the design of rotorcraft flight control systems (FCS) to meet handling qualities requirements. This method is based on multicriterion optimization as implemented in the optimization package CONSOL-OPTCAD (C-O). This package has been developed at the Institute for Systems Research (ISR) at the University of Maryland at College Park. This design methodology has been applied to the design of a FCS for the UH-60A helicopter in hover having the ADOCS control structure. The controller parameters have been optimized to meet the ADS-33C specifications. Furthermore, using this approach, an optimal (minimum control energy) controller has been obtained and trade-off studies have been performed.