Sample records for control construction permit

  1. 47 CFR 1.2003 - Applications affected.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...

  2. 47 CFR 73.3500 - Application and report forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...

  3. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  4. 76 FR 56982 - Approval and Promulgation of Implementation Plans; Texas; Revisions to Permits by Rule and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Pollution by Permits for New Construction or Modification AGENCY: Environmental Protection Agency (EPA... in Title 30 of the Texas Administrative Code (TAC), Chapter 116--Control of Air Pollution by Permits... [email protected] . List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  5. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  6. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  7. 40 CFR 52.681 - Permits to construct and tier II operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...

  8. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  9. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  10. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  11. 29 CFR 1926.152 - Flammable liquids.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner to... feet of each portable tank, there shall be a 12-foot-wide access way to permit approach of fire control... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top...

  12. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  13. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  14. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  15. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  16. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  17. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  18. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  19. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  20. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  1. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  2. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  3. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  4. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  5. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  6. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  7. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  8. 76 FR 80366 - Availability of an Environmental Assessment (EA) and Finding of No Significant Impact (FONSI)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...

  9. 40 CFR 52.1384 - Emission control regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction permit to override a requirement that has been approved as part of the SIP, are disapproved. We cannot approve these provisions into the SIP, as it would allow the State to change a SIP requirement through the issuance of a permit. Pursuant to section 110 of the Act, to change a requirement of the SIP...

  10. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  11. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... (NPDES) general permits for stormwater discharges associated with construction activity in order to... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  12. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...

  13. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  14. 76 FR 60830 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...

  15. 78 FR 72081 - Closed Auction of AM Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...

  16. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  17. EPA's Draft 2017 Construction General Permit (CGP)

    EPA Pesticide Factsheets

    EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.

  18. 75 FR 4554 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' The 2008 CGP...

  19. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  20. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  1. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  2. 78 FR 28547 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... each construction permit exemption claim. WDNR held public hearings on June 27, 28 and 29, 2006, for... required to respond to the construction permit exemption claim submitted. NR 406.04(1q)(1) and (5) for... pollution from construction permit requirements. EPA is proposing to approve these revisions because they...

  3. 75 FR 61752 - Auction of FM Broadcast Construction Permits Scheduled for March 29, 2011; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...

  4. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  5. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  6. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  7. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  8. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  9. 78 FR 31536 - California State Nonroad Engine Pollution Control Standards; In-Use Heavy Duty Vehicles (as...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... immediately attempt to regulate new farm and construction equipment and that under any compliance pathway a... from new nonroad engines which are used in construction equipment or vehicles or used in farm equipment... with section 202(a) if: (1) There is inadequate lead time to permit the development of the necessary...

  10. 75 FR 49949 - Notice of Lodging of Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... limitations at two wastewater treatment plants, and failed to meet permit construction deadlines for its Sand Island treatment plant. The State of Hawaii has joined as a co-plaintiff and brings its own claims under... control program for the discharge of grease. In addition, CCH agrees to complete construction of...

  11. 40 CFR 49.155 - Permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...

  12. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  13. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  14. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  15. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  16. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  17. 33 CFR 203.47 - Modifications to non-Federal flood control works.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...

  18. 33 CFR 203.47 - Modifications to non-Federal flood control works.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...

  19. 33 CFR 203.47 - Modifications to non-Federal flood control works.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...

  20. 33 CFR 203.47 - Modifications to non-Federal flood control works.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...

  1. 33 CFR 203.47 - Modifications to non-Federal flood control works.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...

  2. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...

  3. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  4. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  5. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  6. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  7. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  8. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  9. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  10. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  11. Toy Modification Note: Build It Yourself Battery Interrupter. Revised.

    ERIC Educational Resources Information Center

    Vanderheiden, Gregg C.; Brandenburg, S.

    This toy modification note presents illustrated instructions on how to build a battery interrupter that permits on/off control of battery-operated toys without modification of the toys themselves. The device allows for a separate control switch which can be custom designed to fit a handicapped user's needs. Information on the construction and use…

  12. 77 FR 33630 - Residency Requirements for Aliens Acquiring Firearms (2011R-23P)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... acquire a firearm. The Department has determined that the Gun Control Act does not permit ATF to impose a... the Gun Control Act of 1968 (GCA), 18 U.S.C. 922(b)(3), makes it unlawful for a Federal firearms... the Gun Control Act cannot have two different constructions, one that applies to U.S. citizens and...

  13. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  14. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  15. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  16. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  18. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  19. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  20. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  1. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  2. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  3. Evaluating the effectiveness of best management practices and green infrastructure in the State of California

    EPA Science Inventory

    Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...

  4. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  5. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  6. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  7. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  8. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  9. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...

  10. Temporary traffic control and enforcement of traffic laws in closed road sections.

    DOT National Transportation Integrated Search

    2007-06-01

    "Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses locate...

  11. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  12. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  13. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  14. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  15. 46 CFR 287.7 - Circumstances permitting reimbursement from a construction reserve fund.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Circumstances permitting reimbursement from a... Circumstances permitting reimbursement from a construction reserve fund. (a) Payments prior to establishment of... this part, draw against such fund as reimbursement for the amount, if any, of other funds which, with...

  16. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  17. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  18. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  19. 25 CFR 166.316 - Can a permittee construct improvements on permitted Indian land?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a permittee construct improvements on permitted Indian land? 166.316 Section 166.316 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation Practices and Improvements § 166...

  20. 78 FR 40968 - Notice of Extension of Deadline to Commence Construction Under Clean Air Act Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...

  1. 77 FR 16853 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... construction of a commercial development, and seeks a 5-year permit. The 7.7-ac project is located on parcel 09... project includes construction of a commercial development and the associated infrastructure, and...

  2. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  3. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  4. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  5. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  6. 76 FR 24874 - Initiation of Scoping for an Environmental Assessment (EA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ...) General Permit for Discharges from Construction Activities. The EA will evaluate the potential environmental impacts from the discharge of pollutants associated with stormwater runoff from construction... days of the date of the publication of the Proposed Construction General Permit in the Federal Register...

  7. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  8. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  9. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  10. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  11. 25 CFR 166.317 - What happens to improvements constructed on Indian lands when the permit has been terminated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to improvements constructed on Indian lands when the permit has been terminated? 166.317 Section 166.317 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation...

  12. 78 FR 63489 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    .... Herrington, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE15414B-0... construction of commercial developments, and they seek a 10-year permit. The 7.81-ac project is located on... East, Lake County, Florida. The project includes construction of a commercial development and the...

  13. Qualitative differential games with two targets

    NASA Technical Reports Server (NTRS)

    Getz, W. M.; Leitmann, G.

    1977-01-01

    So-called differential games of kind (qualitative games) were considered involving two or more players each of whom possesses a target toward which he wished to steer the response of a dynamical system that was under the control of all players. Sufficient conditions were derived, which assure termination on a particular player's target. In general, these conditions were constructive in that they permited construction of a winning (terminating) strategy for a player. The theory is illustrated by a pursuit-evasion problem.

  14. 33 CFR 211.6 - Rights which may be granted by the Secretary of the Army in river and harbor and flood control...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recreational facilities in reservoir areas under the control of the Department of the Army and to permit the construction, maintenance, and operation of such facilities. The Secretary of the Army is authorized to grant leases of lands, including structures or facilities thereon, in reservoir areas for such periods and upon...

  15. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

  16. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

  17. Monitoring and Controlling Engineering and Construction Management Cost Performance Within the Corps of Engineers

    DTIC Science & Technology

    1988-12-01

    COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type

  18. 10 CFR 50.67 - Accident source term.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... occupancy of the control room under accident conditions without personnel receiving radiation exposures in... 10 Energy 1 2014-01-01 2014-01-01 false Accident source term. 50.67 Section 50.67 Energy NUCLEAR... Conditions of Licenses and Construction Permits § 50.67 Accident source term. (a) Applicability. The...

  19. 10 CFR 50.67 - Accident source term.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... occupancy of the control room under accident conditions without personnel receiving radiation exposures in... 10 Energy 1 2012-01-01 2012-01-01 false Accident source term. 50.67 Section 50.67 Energy NUCLEAR... Conditions of Licenses and Construction Permits § 50.67 Accident source term. (a) Applicability. The...

  20. 10 CFR 50.67 - Accident source term.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... occupancy of the control room under accident conditions without personnel receiving radiation exposures in... 10 Energy 1 2010-01-01 2010-01-01 false Accident source term. 50.67 Section 50.67 Energy NUCLEAR... Conditions of Licenses and Construction Permits § 50.67 Accident source term. (a) Applicability. The...

  1. 10 CFR 50.67 - Accident source term.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... occupancy of the control room under accident conditions without personnel receiving radiation exposures in... 10 Energy 1 2013-01-01 2013-01-01 false Accident source term. 50.67 Section 50.67 Energy NUCLEAR... Conditions of Licenses and Construction Permits § 50.67 Accident source term. (a) Applicability. The...

  2. 10 CFR 50.67 - Accident source term.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... occupancy of the control room under accident conditions without personnel receiving radiation exposures in... 10 Energy 1 2011-01-01 2011-01-01 false Accident source term. 50.67 Section 50.67 Energy NUCLEAR... Conditions of Licenses and Construction Permits § 50.67 Accident source term. (a) Applicability. The...

  3. Polynomial Conjoint Analysis of Similarities: A Model for Constructing Polynomial Conjoint Measurement Algorithms.

    ERIC Educational Resources Information Center

    Young, Forrest W.

    A model permitting construction of algorithms for the polynomial conjoint analysis of similarities is presented. This model, which is based on concepts used in nonmetric scaling, permits one to obtain the best approximate solution. The concepts used to construct nonmetric scaling algorithms are reviewed. Finally, examples of algorithmic models for…

  4. 77 FR 47065 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...

  5. The other side of the broken window: a methodology that translates building permits into an ecometric of investment by community members.

    PubMed

    O'Brien, Daniel Tumminelli; Montgomery, Barrett W

    2015-03-01

    Much research has focused on physical disorder in urban neighborhoods as evidence that the community does not maintain local norms and spaces. Little attention has been paid to the opposite: indicators of proactive investment in the neighborhood's upkeep. This manuscript presents a methodology that translates a database of approved building permits into an ecometric of investment by community members, establishing basic content, criteria for reliability, and construct validity. A database from Boston, MA contained 150,493 permits spanning 2.5 years, each record including the property to be modified, permit type, and date issued. Investment was operationalized as the proportion of properties in a census block group that underwent an addition or renovation, excluding larger developments involving the demolition or construction of a building. The reliability analysis found that robust measures could be generated every 6 months, and that longitudinal analysis could differentiate between trajectories across neighborhoods. The validity analysis supported two hypotheses: investment was best predicted by homeownership and median income; and maintained an independent relationship with measures of physical disorder despite controlling for demographics, implying that it captures the other end of a spectrum of neighborhood maintenance. Possible uses for the measure in research and policy are discussed.

  6. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  7. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  8. 75 FR 13058 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... for the control of nonmetallic mineral processing plants (IDEQ Docket 58-0101-0002 and a portion of..., 204 and 205 now include language stating that the applicable Federal regulations are incorporated by....01.01.200. IDAPA 58.01.01.225 Permit to Construct Processing Fee, was revised for consistency with...

  9. 40 CFR 63.43 - Maximum achievable control technology (MACT) determinations for constructed and reconstructed...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... determinations for alternative operating scenarios. Approval of such determinations satisfies the requirements of section 112(g) of each such scenario. (4) Regardless of the review process, the MACT emission limitation... determined by the permitting authority. (2) Based upon available information, as defined in this subpart, the...

  10. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  11. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  12. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  13. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  14. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  15. 47 CFR 73.865 - Assignment and transfer of LPFM licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... transfer an LPFM construction permit at any time. (e) Transfers of control involving a sudden change of... 47 Telecommunication 4 2012-10-01 2012-10-01 false Assignment and transfer of LPFM licenses. 73... SERVICES RADIO BROADCAST SERVICES Low Power FM Broadcast Stations (LPFM) § 73.865 Assignment and transfer...

  16. PBO Facility Construction: Basin and Range and Rocky Mountain Regions Status

    NASA Astrophysics Data System (ADS)

    Friesen, B.; Jenkins, F.; Kasmer, D.; Feaux, K.

    2007-12-01

    The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three- dimensional strain field resulting from active plate boundary deformation across the western United States. PBO is a large construction project involving the reconnaissance, permitting, installation, documentation, and maintenance of 875 permanent GPS stations in five years. 163 of these stations lie within the Basin and Range and Rocky Mountain Regions consisting of the states of Montana, Idaho, Nevada, Utah, Wyoming, Colorado, New Mexico, and Arizona. During the fourth year of the project, the Basin and Range and Rocky Mountain regions of PBO completed reconnaissance and nearly all permitting activities, and maintained a fast pace of station installations. The fall of 2006 and spring of 2007 were devoted to the construction of a large push of 50 stations, most located on Bureau of Land Management controlled public lands in Nevada. This transect is located along Highway 50 and will profile the extension of the Basin and Range province. The Yellowstone area, including surrounding National Parks and Forests was the target of summer 2007, during which time 10 remote stations with difficult logistics were installed. To date, construction is complete for 135 of 163 GPS stations.

  17. Mississippi SIP: Title 11, Part 2, Chapter 2 - Permit Regulations for the Construction and/or Operation of Air Emissions Equipment

    EPA Pesticide Factsheets

    Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations

  18. Iowa SIP: Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

    EPA Pesticide Factsheets

    EPA Approved Iowa Regulations - 40 CFR 52.820(c) Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

  19. American Canyon Sanitary Landfill Operation Regulatory Permit Application, Napa County, California, Public Notice 9297-29R.

    DTIC Science & Technology

    1982-03-01

    control and containment levees on land located along the east bank of the Napa River in southern Napa County, California. 2. In response to the National...approximately 60 acres with construction of flood protection and containment levees around these areas. The estimated refuse and earthwork volumes are...of flood control and containment levees) of restorable wetland being permanently converted to upland. f. provide nuisance factors associated with

  20. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  1. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  2. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...

  3. Coherent optical monolithic phased-array antenna steering system

    DOEpatents

    Hietala, Vincent M.; Kravitz, Stanley H.; Vawter, Gregory A.

    1994-01-01

    An optical-based RF beam steering system for phased-array antennas comprising a photonic integrated circuit (PIC). The system is based on optical heterodyning employed to produce microwave phase shifting by a monolithic PIC constructed entirely of passive components. Microwave power and control signal distribution to the antenna is accomplished by optical fiber, permitting physical separation of the PIC and its control functions from the antenna. The system reduces size, weight, complexity, and cost of phased-array antenna systems.

  4. HYDRAULIC SERVO CONTROL MECHANISM

    DOEpatents

    Hussey, R.B.; Gottsche, M.J. Jr.

    1963-09-17

    A hydraulic servo control mechanism of compact construction and low fluid requirements is described. The mechanism consists of a main hydraulic piston, comprising the drive output, which is connected mechanically for feedback purposes to a servo control piston. A control sleeve having control slots for the system encloses the servo piston, which acts to cover or uncover the slots as a means of controlling the operation of the system. This operation permits only a small amount of fluid to regulate the operation of the mechanism, which, as a result, is compact and relatively light. This mechanism is particuiarly adaptable to the drive and control of control rods in nuclear reactors. (auth)

  5. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  6. 40 CFR 71.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...

  7. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  8. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  9. FNF Construction, Inc. Coverage under General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country

    EPA Pesticide Factsheets

    Documents related to the FNF Construction, Inc. Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country to be Located near Ganado, Arizona on the Navajo Nation.

  10. 77 FR 18923 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...

  11. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... permit program for pre- construction review of certain new and modified major stationary sources in... program as required by section 165 of the CAA for certain new and modified major stationary sources... the CAA requires states to adopt a pre-construction permitting program for certain new and modified...

  12. 76 FR 9809 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE35022A-0, U.S. Fish and... ac of occupied Florida scrub-jay foraging and sheltering habitat incidental to construction of a... construction of a commercial center and the associated infrastructure, and landscaping. The applicant proposes...

  13. 47 CFR 74.112 - Supplementary statement with application for construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction permit for any experimental broadcast station confirming the applicant's understanding: (a) That... notice or hearing. (e) That any authorization issued pursuant to the application may be cancelled at any time without notice or hearing, and will expire as a matter of law if the station fails to transmit...

  14. An automatic pellet dispenser for precise control of feeding topography in granivorous birds

    PubMed Central

    Berkhoudt, H.; Van Der Reijden, D.; Heijmans, M.

    1987-01-01

    Design and construction of an automatic pellet dispenser for granivorous birds are described. The dispenser permits rapid pneumatic delivery of pellets (five pellets per second maximum) to one controlled position and does not interfere with simultaneous electrophysiological recording. In addition, the device continuously indicates presence or absence of a pellet in the delivery position. This automatic dispenser proved very effective in our studies of stereotyped topographies of feeding in granivorous birds, such as pigeons and chickens. PMID:16812503

  15. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  16. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  17. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  18. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  19. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  20. 77 FR 42488 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Panoche Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...

  1. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...

  2. FNF Construction Inc. Window Rock Airport Project: Coverage Under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country

    EPA Pesticide Factsheets

    Approved Request for Coverage under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country for FNF Construction Inc. Window Rock Airport Soil Cement Mixing Plant Project, Beacon Road, Window Rock, Arizona 86515.

  3. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  4. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  5. Operator function modeling: An approach to cognitive task analysis in supervisory control systems

    NASA Technical Reports Server (NTRS)

    Mitchell, Christine M.

    1987-01-01

    In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).

  6. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  7. Environmental Assessment (EA): Proposed Missile Storage Improvements, Utah Test and Training Range

    DTIC Science & Technology

    2013-06-11

    Implementation Plan SOC Species of Concern SOx Oxides of Sulfur SO2 Sulfur Dioxide START Strategic Arms Reduction Treaty SWPPP Stormwater Pollution ...Discussions related to preventing soil erosion ( stormwater pollution prevention) are addressed under water quality effects (Section 4 of this...construction activities, this permit must be obtained and erosion and sediment controls must be installed according to a stormwater pollution

  8. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... total capacity of 1,700 kilowatts (kW), installed within the existing intake tower; (2) an electrical control booth constructed on top of the intake tower; and (3) a 700- foot-long, 13.2 kilo-Volt (kV...; (3) a powerhouse containing two generating units with a total capacity of 3,320 kW; (4) the existing...

  9. 76 FR 40725 - Approval of Outer Continental Shelf (OCS) Permit Issued to Cape Wind Associates, LLC (EPA Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...

  10. An examination of the Virginia Department of Transportation's 404 general permit program.

    DOT National Transportation Integrated Search

    1988-01-01

    Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. A...

  11. 75 FR 22434 - Exelon Nuclear Texas Holdings, LLC; Notice of Receipt and Availability of Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...

  12. 75 FR 68821 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...- megawatt (MW), 21-turbine Kaheawa Wind Power I (KWP I) project. Like KWP II, KWP I is owned by First Wind... wind turbine structures. The Hawaiian petrel and Newell's shearwater breed on Maui and feed in the open... the permit include the construction and operation of a new 21-megawatt, 14-turbine wind energy...

  13. 77 FR 16082 - In the Matter of All Power Reactor Licensees and Holders of Construction Permits in Active Or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ...) I The Licensees and construction permit (CP) holders\\1\\ identified in Attachment 1 to this Order... identified in Attachment 1 to this Order (i.e., Watts Bar, Unit 2; and Bellefonte, Units 1 and 2) [[Page... boiled dry, resulting in fuel damage.\\2\\ Fukushima demonstrated the confusion and misapplication of...

  14. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  15. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  16. Specifically Designed Constructed Wetlands: A Novel Treatment Approach for Scrubber Wastewater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John H. Rodgers Jr; James W. Castle; Chris Arrington: Derek Eggert

    2005-09-01

    A pilot-scale wetland treatment system was specifically designed and constructed at Clemson University to evaluate removal of mercury, selenium, and other constituents from flue gas desulfurization (FGD) wastewater. Specific objectives of this research were: (1) to measure performance of a pilot-scale constructed wetland treatment system in terms of decreases in targeted constituents (Hg, Se and As) in the FGD wastewater from inflow to outflow; (2) to determine how the observed performance is achieved (both reactions and rates); and (3) to measure performance in terms of decreased bioavailability of these elements (i.e. toxicity of sediments in constructed wetlands and toxicity ofmore » outflow waters from the treatment system). Performance of the pilot-scale constructed wetland treatment systems was assessed using two criteria: anticipated NPDES permit levels and toxicity evaluations using two sentinel toxicity-testing organisms (Ceriodaphnia dubia and Pimephales promelas). These systems performed efficiently with varied inflow simulations of FGD wastewaters removing As, Hg, and Se concentrations below NPDES permit levels and reducing the toxicity of simulated FGD wastewater after treatment with the constructed wetland treatment systems. Sequential extraction procedures indicated that these elements (As, Hg, and Se) were bound to residual phases within sediments of these systems, which should limit their bioavailability to aquatic biota. Sediments collected from constructed wetland treatment systems were tested to observe toxicity to Hyalella azteca or Chironomus tetans. Complete survival (100%) was observed for H. azteca in all cells of the constructed wetland treatment system and C. tentans had an average of 91% survival over the three treatment cells containing sediments. Survival and growth of H. azteca and C. tentans did not differ significantly between sediments from the constructed wetland treatment system and controls. Since the sediments of the constructed wetland treatment system are repositories for As, Hg, and Se and the bioavailability of these elements decreased after deposition, the pilot-scale constructed wetland treatment system contributed significantly to mitigation of risks to aquatic life from these elements.« less

  17. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  18. Loudspeaker line array educational demonstration.

    PubMed

    Anderson, Brian E; Moser, Brad; Gee, Kent L

    2012-03-01

    This paper presents a physical demonstration of an audio-range line array used to teach interference of multiple sources in a classroom or laboratory exercise setting. Software has been developed that permits real-time control and steering of the array. The graphical interface permits a user to vary the frequency, the angular response by phase shading, and reduce sidelobes through amplitude shading. An inexpensive, eight-element loudspeaker array has been constructed to test the control program. Directivity measurements of this array in an anechoic chamber and in a large classroom are presented. These measurements have good agreement with theoretical directivity predictions, thereby allowing its use as a quantitative learning tool for advanced students as well as a qualitative demonstration of arrays in other settings. Portions of this paper are directed toward educators who may wish to implement a similar demonstration for their advanced undergraduate or graduate level course in acoustics. © 2012 Acoustical Society of America

  19. 77 FR 27054 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Offshore, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...

  20. 76 FR 55799 - Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to Avenal Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...

  1. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  2. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  3. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  4. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  5. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  6. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  7. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  8. 78 FR 46520 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2008-0402; FRL-9834-4] Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule AGENCY: Environmental.... WDNR submitted revisions exempting certain sources of air pollution from construction permit...

  9. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  10. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  11. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  12. 77 FR 64237 - Notice of Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...

  13. Design and installation of a next generation pilot scale fermentation system.

    PubMed

    Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P

    2003-01-01

    Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.

  14. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  15. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Digital construction period. 74.788 Section 74... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  16. Plant centromere compositions

    DOEpatents

    Mach, Jennifer M [Chicago, IL; Zieler, Helge [Del Mar, CA; Jin, RongGuan [Chesterfield, MO; Keith, Kevin [Three Forks, MT; Copenhaver, Gregory P [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2011-08-02

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  17. Plant centromere compositions

    DOEpatents

    Mach,; Jennifer M. , Zieler; Helge, Jin [Del Mar, CA; RongGuan, Keith [Chesterfield, MO; Kevin, Copenhaver [Three Forks, MT; Gregory P. , Preuss; Daphne, [Chicago, IL

    2011-11-22

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  18. Plant centromere compositions

    DOEpatents

    Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2006-10-10

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  19. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, James [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2006-06-26

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  20. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, RongGuan [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2007-06-05

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  1. 77 FR 28491 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected]gov . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  2. 77 FR 34808 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected] . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  3. 75 FR 82246 - Action To Ensure Authority To Issue Permits Under the Prevention of Significant Deterioration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Deterioration (PSD) program to sources of greenhouse gases (GHGs). This action will ensure that a permitting authority--EPA--is available in these states as of January 2, 2011, when PSD becomes applicable to GHG-emitting sources, to issue preconstruction PSD permits and thereby facilitate construction or expansion...

  4. 33 CFR 321.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of applications for Department of the Army (DA) permits to authorize the construction of a dike or... require DA permits under section 404 of the Clean Water Act, as amended (33 U.S.C. 1344). Applicants for DA permits under this part should also refer to 33 CFR part 323 to satisfy the requirements of...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  6. Oil and Gas Stormwater Permitting Documents

    EPA Pesticide Factsheets

    This final rule exempts construction activities at oil and gas sites from the requirement to obtain an NPDES permit for stormwater discharges except in very limited instances. This rule is effective June 12, 2006.

  7. 77 FR 34897 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit to Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0394, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  8. 77 FR 28543 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ...-0292, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  9. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  10. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  11. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  12. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  13. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  14. Synthetic Minor NSR Permit: Arrow Pipeline, LLC - Station #7

    EPA Pesticide Factsheets

    This page contains the administratively revised synthetic minor permit to construct for the Arrow Pipeline, LLC, Station #7, located within the exterior boundaries of the Fort Berthold Indian Reservation in Dunn County, North Dakota.

  15. 75 FR 68215 - Direct Final Rule Staying Numeric Limitation for the Construction and Development Point Source...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... required to obtain NPDES permit coverage and performing the following activities: Construction of buildings, including building, developing and general contracting. Heavy and civil 237 engineering construction... Rule Staying Numeric Limitation for the Construction and Development Point Source Category AGENCY...

  16. Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7

    DTIC Science & Technology

    1989-10-23

    817) 824-5606. Reelfoot Lake Water Level believes that the proposed timber EIS No. 890197. Final, USA. UT, Tooele Management Plan. Implementation...2: Incidenial lake erit The potential need for an incidental take permit is discussed in Section 4.4.1, Regional Environment. Comment No. 3...and Crow Indian Tribes. Yellowstone, E02, Lake Catamount ResortAvailability Big Horn and Rosebud Counties, MT, Construction. Special Use Permit

  17. 77 FR 68197 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... emergent, scrub-shrub and forested wetlands. Subject to the permit conditions, INDOT is permitted to... emergent, scrub-shrub, and forested wetlands in constructing these 18 crossings. The actions by the Federal...

  18. 40 CFR 60.1705 - What emission limits must I meet? By when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... modification after June 26, 1987, then you must comply with the dioxins/furans and mercury emission limits... construction or operating permit, if a permit modification is required. Final compliance with the dioxins...

  19. Expression of GFP under the control of the RNA helicase VASA permits fluorescence-activated cell sorting isolation of human primordial germ cells.

    PubMed

    Tilgner, Katarzyna; Atkinson, Stuart P; Yung, Sun; Golebiewska, Anna; Stojkovic, Miodrag; Moreno, Ruben; Lako, Majlinda; Armstrong, Lyle

    2010-01-01

    The isolation of significant numbers of human primordial germ cells at several developmental stages is important for investigations of the mechanisms by which they are able to undergo epigenetic reprogramming. Only small numbers of these cells can be obtained from embryos of appropriate developmental stages, so the differentiation of human embryonic stem cells is essential to obtain sufficient numbers of primordial germ cells to permit epigenetic examination. Despite progress in the enrichment of human primordial germ cells using fluorescence-activated cell sorting (FACS), there is still no definitive marker of the germ cell phenotype. Expression of the widely conserved RNA helicase VASA is restricted to germline cells, but in contrast to species such as Mus musculus in which reporter constructs expressing green fluorescent protein (GFP) under the control of a Vasa promoter have been developed, such reporter systems are lacking in human in vitro models. We report here the generation and characterization of human embryonic stem cell lines stably carrying a VASA-pEGFP-1 reporter construct that expresses GFP in a population of differentiating human embryonic stem cells that show expression of characteristic markers of primordial germ cells. This population shows a different pattern of chromatin modifications to those obtained by FACS enrichment of Stage Specific Antigen one expressing cells in our previous publication.

  20. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  1. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  2. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  3. Lift-Shape Construction, An EFL Project Report.

    ERIC Educational Resources Information Center

    Evans, Ben H.

    Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…

  4. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  5. Documents related to Proposed Class II injection well permit modification MI-147-2D-0014

    EPA Pesticide Factsheets

    Public notice for proposed modification of permit number MI-147-2D-0014 (St. Clair County, MI). The proposed modification would change the injection zone, the construction, and reduce the injection pressure.

  6. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Heavy and Civil Engineering 237 Construction. EPA does not intend the preceding table to be exhaustive... challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may...

  7. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  8. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  9. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  10. Development of uniform standards for allowable lane closure : final report, September 2008.

    DOT National Transportation Integrated Search

    2008-09-01

    Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...

  11. NPDES Permit for Denver Federal Center Building 52A in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034860, the GSA is authorized to discharge wastewater from construction dewatering activities at Denver Federal Center Building 52A in Lakewood, Colo., to to the storm drain system entering McIntyre Gulch.

  12. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  13. Risk management in technovigilance: construction and validation of a medical-hospital product evaluation instrument.

    PubMed

    Kuwabara, Cleuza Catsue Takeda; Evora, Yolanda Dora Martinez; de Oliveira, Márcio Mattos Borges

    2010-01-01

    With the continuous incorporation of health technologies, hospital risk management should be implemented to systemize the monitoring of adverse effects, performing actions to control and eliminate their damage. As part of these actions, Technovigilance is active in the procedures of acquisition, use and quality control of health products and equipment. This study aimed to construct and validate an instrument to evaluate medical-hospital products. This is a quantitative, exploratory, longitudinal and methodological development study, based on the Six Sigma quality management model, which has as its principle basis the component stages of the DMAIC Cycle. For data collection and content validation, the Delphi technique was used with professionals from the Brazilian Sentinel Hospital Network. It was concluded that the instrument developed permitted the evaluation of the product, differentiating between the results of the tested brands, in line with the initial study goal of qualifying the evaluations performed.

  14. Representation of Ice Geometry by Parametric Functions: Construction of Approximating NURBS Curves and Quantification of Ice Roughness--Year 1: Approximating NURBS Curves

    NASA Technical Reports Server (NTRS)

    Dill, Loren H.; Choo, Yung K. (Technical Monitor)

    2004-01-01

    Software was developed to construct approximating NURBS curves for iced airfoil geometries. Users specify a tolerance that determines the extent to which the approximating curve follows the rough ice. The user can therefore smooth the ice geometry in a controlled manner, thereby enabling the generation of grids suitable for numerical aerodynamic simulations. Ultimately, this ability to smooth the ice geometry will permit studies of the effects of smoothing upon the aerodynamics of iced airfoils. The software was applied to several different types of iced airfoil data collected in the Icing Research Tunnel at NASA Glenn Research Center, and in all cases was found to efficiently generate suitable approximating NURBS curves. This method is an improvement over the current "control point formulation" of Smaggice (v.1.2). In this report, we present the relevant theory of approximating NURBS curves and discuss typical results of the software.

  15. 76 FR 12693 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ....S. Census Bureau. Title: Survey of Construction--Questionnaire for Building Permit Official. OMB... Construction (SOC). Government agencies and private companies use statistics from SOC to monitor and evaluate the large and dynamic housing construction industry. The SOC-QBPO is an electronic questionnaire...

  16. 78 FR 23327 - Issuance of a Presidential Permit Authorizing the State of Michigan to Construct, Connect...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ...) The construction, operation and maintenance of the United States facilities shall be in all material... ``Application''). Article 2. (1) The standards for, and the manner of, the construction, operation, and... performance of their official duties. (2) Prior to initiation of construction, the permittee shall obtain the...

  17. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  18. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  19. Space Programs Summary 37-33. Volume 3. The Deep Space Network for the period 1 March-30 April 1965

    DTIC Science & Technology

    1965-05-31

    designed to communicate To improve the data rate and distance capability, a 210-ft with, and permit control of, spacecraft designed for deep antenna is...51 experienced doppler problems. It was neces- tracking momentarily to make this change. It was de - sary to determine the bias oscillator frequencies...is being designed and constructed for the Mars site of the Gold- stone space communications station. The operating fre- quency of the AAS will be at

  20. Low temperature ion source for calutrons

    DOEpatents

    Veach, Allen M.; Bell, Jr., William A.; Howell, Jr., George D.

    1981-01-01

    A new ion source assembly for calutrons has been provided for the efficient separation of elements having high vapor pressures. The strategic location of cooling pads and improved insulation permits operation of the source at lower temperatures. A vapor valve constructed of graphite and located in a constantly increasing temperature gradient provides reliable control of the vapor flow from the charge bottle to the arc chamber. A pronounced saving in calutron operating time and equipment maintenance has been achieved with the use of the present ion source.

  1. Low temperature ion source for calutrons

    DOEpatents

    Veach, A.M.; Bell, W.A. Jr.; Howell, G.D. Jr.

    1979-10-10

    A new ion source assembly for calutrons has been provided for the efficient separation of elements having high vapor pressures. The strategic location of cooling pads and improved insulation permits operation of the source at lower temperatures. A vapor valve constructed of graphite and located in a constantly increasing temperature gradient provides reliable control of the vapor flow from the charge bottle to the arc chamber. A pronounced saving in calutron operating time and equipment maintenance has been achieved with the use of the present ion source.

  2. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  3. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  4. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  5. Structural load control during construction

    NASA Technical Reports Server (NTRS)

    Mikulas, Martin M., Jr.

    1991-01-01

    In the absence of gravitational pull, the major design considerations for large space structures are stiffness for controllability, and transient dynamic loadings (as opposed to the traditional static load associated with earth-based structures). Because of the absence of gravitational loading, space structures can be designed to be significantly lighter than their counterparts on Earth. For example, the Space Shuttle manipulator arm is capable of moving and positioning a 60,000 lb payload, yet weighs less than 1,000 lbs. A recent design for the Space Station which had a total weight of about 500,000 lbs. used a primary loadcarrying keel beam which weighed less than 10,000 lbs. For many large space structures designs it is quite common for the load-carrying structure to have a mass fraction on the order of one or two percent of the total spacecraft mass. This significant weight reduction for large space structures is commonly accompanied by very low natural frequencies. These low frequencies cause an unprecedented level of operational complexity for mission applications which require a high level of positioning and control accuracy. This control problem is currently the subject of considerable research directed towards reducing the flexibility problem. In addition, however, the small mass fraction typically results in structures which are quite unforgiving to inadvertent high loadings. In other words, the structures are 'fragile.' In order to deal with the fragility issue CSC developed a load-limiting concept for space truss structures. This concept is aimed at limiting the levels of load which can occur in a large space structure during the construction process as well as during subsequent operations. Currently, the approach for dealing with large loadings is to make the structure larger. The impact this has on construction is significant. The larger structures are more difficult to package in the launch vehicle, and in fact in some instances the concept must be changed from a deployable truss to an erectable truss to permit packaging. The new load-limiting concept is aimed at permitting the use in large space structures of smaller trusses with a high level of strength robustness, in order to simplify the construction process. To date several analyses conducted on the concept have demonstrated its feasibility, and an experiment is currently being designed to demonstrate its operation.

  6. Fast encryption of RGB color digital images using a tweakable cellular automaton based schema

    NASA Astrophysics Data System (ADS)

    Faraoun, Kamel Mohamed

    2014-12-01

    We propose a new tweakable construction of block-enciphers using second-order reversible cellular automata, and we apply it to encipher RGB-colored images. The proposed construction permits a parallel encryption of the image content by extending the standard definition of a block cipher to take into account a supplementary parameter used as a tweak (nonce) to control the behavior of the cipher from one region of the image to the other, and hence avoid the necessity to use slow sequential encryption's operating modes. The proposed construction defines a flexible pseudorandom permutation that can be used with efficacy to solve the electronic code book problem without the need to a specific sequential mode. Obtained results from various experiments show that the proposed schema achieves high security and execution performances, and enables an interesting mode of selective area decryption due to the parallel character of the approach.

  7. MULTIPLE SPARK GAP SWITCH

    DOEpatents

    Schofield, A.E.

    1958-07-22

    A multiple spark gap switch of unique construction is described which will permit controlled, simultaneous discharge of several capacitors into a load. The switch construction includes a disc electrode with a plurality of protuberances of generally convex shape on one surface. A firing electrode is insulatingly supponted In each of the electrode protuberances and extends substantially to the apex thereof. Individual electrodes are disposed on an insulating plate parallel with the disc electrode to form a number of spark gaps with the protuberances. These electrodes are each connected to a separate charged capacitor and when a voltage ls applied simultaneously between the trigger electrodes and the dlsc electrode, each spark gap fires to connect its capacitor to the disc electrode and a subsequent load.

  8. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  9. Space Station crew workload - Station operations and customer accommodations

    NASA Technical Reports Server (NTRS)

    Shinkle, G. L.

    1985-01-01

    The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

  10. Minor New Source Review Permit Application: Fluidic, Inc.

    EPA Pesticide Factsheets

    Federal Minor New Source Review New Construction Application for proposed construction of new equipment at an existing source at Fluidic's facility located at 8425 N. 9th Street, Suite #4, Scottsdale, Arizona 48258.

  11. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhatt, Arpit H; Zhang, Yi Min

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major sourcemore » threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.« less

  12. Majestic C Team, LLC - Clean Water Act Public Notice

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Majestic C Team, LLC., which owns a residential construction site located at 168th St and State St in Omaha, NE for alleged violations of its NPDES permit (permit No. NER11

  13. 33 CFR 114.05 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (h) Permit. The term “permit” means the license permitting construction of bridges and approaches... subchapter. (i) Secretary. The term “Secretary” means the Secretary of Homeland Security or any person to... term “bridge” means a structure erected across navigable waters of the United States, and includes...

  14. 75 FR 33653 - Exelon Nuclear Texas Holdings, LLC (Exelon) Acceptance for Docketing of an Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ... of 10 CFR Part 52 separate from the filing of an application for a construction permit (CP) or... reference the permit in a CP or COL application. The NRC staff has determined that Exelon has submitted...

  15. Construction Activities Prior to Issuance of a PSD Permit with Respect to Begin Actual Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  17. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  18. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  19. 40 CFR 70.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  20. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  1. 36 CFR 223.37 - Revegetation of temporary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... roads. 223.37 Section 223.37 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... Provisions § 223.37 Revegetation of temporary roads. Timber sale contracts, permits and other documents... roads constructed or used thereunder so as to permit the reestablishment by artificial or natural means...

  2. 10 CFR 50.37 - Agreement limiting access to Classified Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...

  3. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  4. * Three-Dimensional Bioprinting of Polycaprolactone Reinforced Gene Activated Bioinks for Bone Tissue Engineering.

    PubMed

    Cunniffe, Gráinne M; Gonzalez-Fernandez, Tomas; Daly, Andrew; Sathy, Binulal N; Jeon, Oju; Alsberg, Eben; Kelly, Daniel J

    2017-09-01

    Regeneration of complex bone defects remains a significant clinical challenge. Multi-tool biofabrication has permitted the combination of various biomaterials to create multifaceted composites with tailorable mechanical properties and spatially controlled biological function. In this study we sought to use bioprinting to engineer nonviral gene activated constructs reinforced by polymeric micro-filaments. A gene activated bioink was developed using RGD-γ-irradiated alginate and nano-hydroxyapatite (nHA) complexed to plasmid DNA (pDNA). This ink was combined with bone marrow-derived mesenchymal stem cells (MSCs) and then co-printed with a polycaprolactone supporting mesh to provide mechanical stability to the construct. Reporter genes were first used to demonstrate successful cell transfection using this system, with sustained expression of the transgene detected over 14 days postbioprinting. Delivery of a combination of therapeutic genes encoding for bone morphogenic protein and transforming growth factor promoted robust osteogenesis of encapsulated MSCs in vitro, with enhanced levels of matrix deposition and mineralization observed following the incorporation of therapeutic pDNA. Gene activated MSC-laden constructs were then implanted subcutaneously, directly postfabrication, and were found to support superior levels of vascularization and mineralization compared to cell-free controls. These results validate the use of a gene activated bioink to impart biological functionality to three-dimensional bioprinted constructs.

  5. 75 FR 4839 - Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...] Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL AGENCY: Fish and Wildlife Service...-jay) breeding, feeding, and sheltering habitat incidental to lot preparation for the construction of a...)) of Florida scrub-jay breeding, feeding and sheltering habitat incidental to land preparation for...

  6. 75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... constructed in Franklin, New Hampshire. At the Franklin converter terminal the electric energy would be... marketplace, DOE has consistently expressed its policy that cross-border trade in electric energy should be... DEPARTMENT OF ENERGY [OE Docket No. PP-371] Application for Presidential Permit; Northern Pass...

  7. Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations

    DOT National Transportation Integrated Search

    2018-01-01

    Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...

  8. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    EPA Pesticide Factsheets

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  9. 21 CFR 1312.22 - Application for export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  10. Calibration of strain-gage installations in aircraft structures for the measurement of flight loads

    NASA Technical Reports Server (NTRS)

    Skopinski, T H; Aiken, William S , Jr; Huston, Wilber B

    1954-01-01

    A general method has been developed for calibrating strain-gage installations in aircraft structures, which permits the measurement in flight of the shear or lift, the bending moment, and the torque or pitching moment on the principal lifting or control surfaces. Although the stress in structural members may not be a simple function of the three loads of interest, a straightforward procedure is given for numerically combining the outputs of several bridges in such a way that the loads may be obtained. Extensions of the basic procedure by means of electrical combination of the strain-gage bridges are described which permit compromises between strain-gage installation time, availability of recording instruments, and data reduction time. The basic principles of strain-gage calibration procedures are illustrated by reference to the data for two aircraft structures of typical construction, one a straight and the other a swept horizontal stabilizer.

  11. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...

  12. 75 FR 20653 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed TransCanada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Presidential permit for the construction, operation, and maintenance of pipeline facilities at the border of... referred to in Executive Order 13337, as amended, for the construction, connection, operation, or... environmental effects of the construction and operation of the United States portion of the Keystone XL Pipeline...

  13. Constructing temporary sampling platforms for hydrologic studies

    Treesearch

    Manuel H. Martinez; Sandra E. Ryan

    2000-01-01

    This paper presents instructions for constructing platforms that span the width of stream channels to accommodate the measurement of hydrologic parameters over a wide range of discharges. The platforms provide a stable, safe, noninvasive, easily constructed, and relatively inexpensive means for permitting data collection without wading in the flow. We have used the...

  14. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...

  15. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  16. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  17. An equivalent circuit for small atrial trabeculae of frog.

    PubMed Central

    Jakobsson, E; Barr, L; Connor, J A

    1975-01-01

    An equivalent electrical circuit has been constructed for small atrial trabecula of frog in a double sucrose gap voltage clamp apparatus. The basic strategy in constructing the circuit was to derive the distribution of membrane capacitance and extracellular resistance from the preparation's response to small voltage displacements near the resting condition, when the membrane conductance is presumably quite low. Then standard Hodgkin-Huxley channels were placed in parallel with the capacitance and the results of voltage clamp experiments were simulated. The results suggest that the membranes of the preparation cannot in fact be clamped near the control voltage nor can the ionic currents be measured directly with reasonable accuracy by axon standards. It may or may not be a realizable goal in the future to define the preparation's electrical behavior well enough to permit the ultimate quantitative description of the membrane's specific ion conductances. The result of this paper suggest that if this goal is achieved using the double sucrose gap voltage clamp, it will be by a detailed quantitative accounting for substantial irreducible errors in voltage control, rather than by experimental achievement of good voltage control. PMID:1203441

  18. User interface support

    NASA Technical Reports Server (NTRS)

    Lewis, Clayton; Wilde, Nick

    1989-01-01

    Space construction will require heavy investment in the development of a wide variety of user interfaces for the computer-based tools that will be involved at every stage of construction operations. Using today's technology, user interface development is very expensive for two reasons: (1) specialized and scarce programming skills are required to implement the necessary graphical representations and complex control regimes for high-quality interfaces; (2) iteration on prototypes is required to meet user and task requirements, since these are difficult to anticipate with current (and foreseeable) design knowledge. We are attacking this problem by building a user interface development tool based on extensions to the spreadsheet model of computation. The tool provides high-level support for graphical user interfaces and permits dynamic modification of interfaces, without requiring conventional programming concepts and skills.

  19. United States housing, first quarter 2013

    Treesearch

    Delton Alderman

    2014-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhatt, Arpit; Zhang, Yimin; Davis, Ryan

    The implementation of the US Renewable Fuel Standard is expected to increase the construction and operation of new biofuel facilities. Allowing this industry to grow without adversely affecting air quality is an important sustainability goal sought by multiple stakeholders. However, little is known about how the emission controls potentially required to comply with air quality regulations might impact biorefinery cost and deployment strategies such as siting and sizing. In this study, we use a baseline design for a lignocellulosic hydrocarbon biofuel production process to assess how the integration of emission controls impacts the minimum fuel selling price (MFSP) of themore » biofuel produced. We evaluate the change in MFSP for two cases as compared to the baseline design by incorporating (i) emission controls that ensure compliance with applicable federal air regulations and (ii) advanced control options that could be used to achieve potential best available control technology (BACT) emission limits. Our results indicate that compliance with federal air regulations can be achieved with minimal impact on biofuel cost (~$0.02 per gasoline gallon equivalent (GGE) higher than the baseline price of $5.10 GGE -1). However, if air emissions must be further reduced to meet potential BACT emission limits, the cost could increase nontrivially. For example, the MFSP could increase to $5.50 GGE -1 by adopting advanced emission controls to meet potential boiler BACT limits. Finally, given tradeoffs among emission control costs, permitting requirements, and economies of scale, these results could help inform decisions about biorefinery siting and sizing and mitigate risks associated with air permitting.« less

  1. A cognitive approach to classifying perceived behaviors

    NASA Astrophysics Data System (ADS)

    Benjamin, Dale Paul; Lyons, Damian

    2010-04-01

    This paper describes our work on integrating distributed, concurrent control in a cognitive architecture, and using it to classify perceived behaviors. We are implementing the Robot Schemas (RS) language in Soar. RS is a CSP-type programming language for robotics that controls a hierarchy of concurrently executing schemas. The behavior of every RS schema is defined using port automata. This provides precision to the semantics and also a constructive means of reasoning about the behavior and meaning of schemas. Our implementation uses Soar operators to build, instantiate and connect port automata as needed. Our approach is to use comprehension through generation (similar to NLSoar) to search for ways to construct port automata that model perceived behaviors. The generality of RS permits us to model dynamic, concurrent behaviors. A virtual world (Ogre) is used to test the accuracy of these automata. Soar's chunking mechanism is used to generalize and save these automata. In this way, the robot learns to recognize new behaviors.

  2. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  3. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  4. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  5. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  6. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  7. 76 FR 35431 - Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ...: Table 1--Entities Potentially Regulated by This Permit North American Examples of affected Industry... intend the preceding table to be exhaustive, but provides it as a guide for readers regarding entities.../wastetech/guide/construction/index.cfm . B. Extension of Comment Period EPA is extending the deadline for...

  8. 10 CFR 50.36b - Environmental conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Environmental conditions. 50.36b Section 50.36b Energy... § 50.36b Environmental conditions. (a) Each construction permit under this part, each early site permit... conditions will be derived from information contained in the environmental report submitted pursuant to § 51...

  9. 43 CFR 3212.22 - What criteria establish a new facility for the purpose of obtaining a production incentive?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Lease Suspensions, Cessation of Production, Royalty Rate Reductions, and Energy Policy Act Royalty Rate Conversions § 3212.22 What criteria establish a new... not: (1) Be permitted only with a Geothermal Drilling Permit; (2) Be constructed entirely within the...

  10. 78 FR 67336 - Habitat Conservation Plan for the United Water Conservation District, Santa Clara River Watershed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... incidental take permits for United's construction, operations, and maintenance of water management facilities... maintenance of the Freeman Diversion; diversion of water from the Santa Clara River; vegetation management... current and future water management activities. United intends to request a 50-year permit covering five...

  11. 76 FR 76713 - Agency Information Collection Activities; Proposed Collections; Comment Request; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... review programs for new or modified stationary sources of air pollution. In addition, the provisions of... the emissions from the construction and modification of any stationary source of air pollution to... Flexible Air Permitting Rule also slightly reduced the burden per minor NSR permit. As a result of all...

  12. 78 FR 27196 - Modification of Permit Application and Intent for Additional Public Scoping for an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... simulations. Final channel design and associated environmental impacts will be addressed during the permitting and EIS process. The EIS will evaluate the effects of construction and long term effects of the... in the EIS process; announce the plans for an additional public scoping meeting; solicit public...

  13. A Phloem Sandwich Unit for Observing Bark Beetles, Associated Predators, and Parasites

    Treesearch

    Donald N. Kim; Mitchel C. Miller

    1981-01-01

    This paper describes a phloem sandwich that allows observation of parent beetles, their brood, and associates within the inner bark, and permits observation of predator and parasite behavior on the bark surface. The construction of the unit permits the introduction of multiple pairs of beetles into a single sandwich.

  14. A next generation, pilot-scale continuous sterilization system for fermentation media

    PubMed Central

    Lester, M.; Brix, T.; Wong, D.; Nuechterlein, J.

    2006-01-01

    A new continuous sterilization system was designed, constructed, started up, and qualified for media sterilization for secondary metabolite cultivations, bioconversions, and enzyme production. An existing Honeywell Total Distributed Control 3000-based control system was extended using redundant High performance Process Manager controllers for 98 I/O (input/output) points. This new equipment was retrofitted into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Design strategies of this new continuous sterilizer system and the expanded control system are described and compared with the literature (including dairy and bio-waste inactivation applications) and the weaknesses of the prior installation for expected effectiveness. In addition, the reasoning behind selection of some of these improved features has been incorporated. Examples of enhancements adopted include sanitary heat exchanger (HEX) design, incorporation of a “flash” cooling HEX, on-line calculation of Fo and Ro, and use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation. Sterilizer performance also was characterized over the expected range of operating conditions. Differences between design and observed temperature, pressure, and other profiles were quantified and investigated. PMID:16496186

  15. 75 FR 61577 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... workers certified in the top five industries were as follows: Construction--30,242; Amusement, Gambling... employment in each of these industries: Construction--0.4 percent (30,242/7,265,648); Amusement, Gambling... permitted each year: Construction--0.2 percent (14,756/7,265,648); Amusement, Gambling, and Recreation--0.5...

  16. United States housing, fourth quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarter’s end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...

  17. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator of the Environmental Protection Agency (“EPA”) conditionally exempts electric generating units on... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... to be constructed at Orote, with the following conditions: (i) Each electric generating unit shall...

  18. Experiments in balance with a 2D one-legged hopping machine

    NASA Astrophysics Data System (ADS)

    Raibert, M. H.; Brown, H. B., Jr.

    1984-03-01

    The ability to balance is important to the mobility obtained by legged creatures found in nature, and may someday lead to versatile legged vehicles. In order to study the role of balance in legged locomotion and to develop appropriate control strategies, a 2D hopping machine was constructed for experimentation. The machine has one leg on which it hops and runs, making balance a prime consideration. Control of the machine's locomotion was decomposed into three separate parts: a vertical height control part, a horizontal velocity part, and an angular attitude control part. Experiments showed that the three part control scheme, while very simple to implement, was powerful enough to permit the machine to hop in place, to run at a desired rate, to translate from place to place, and to leap over obstacles. Results from modeling and computer simulation of a similar one-legged device are described by Raibert (1983).

  19. Mammalian designer cells: Engineering principles and biomedical applications.

    PubMed

    Xie, Mingqi; Fussenegger, Martin

    2015-07-01

    Biotechnology is a widely interdisciplinary field focusing on the use of living cells or organisms to solve established problems in medicine, food production and agriculture. Synthetic biology, the science of engineering complex biological systems that do not exist in nature, continues to provide the biotechnology industry with tools, technologies and intellectual property leading to improved cellular performance. One key aspect of synthetic biology is the engineering of deliberately reprogrammed designer cells whose behavior can be controlled over time and space. This review discusses the most commonly used techniques to engineer mammalian designer cells; while control elements acting on the transcriptional and translational levels of target gene expression determine the kinetic and dynamic profiles, coupling them to a variety of extracellular stimuli permits their remote control with user-defined trigger signals. Designer mammalian cells with novel or improved biological functions not only directly improve the production efficiency during biopharmaceutical manufacturing but also open the door for cell-based treatment strategies in molecular and translational medicine. In the future, the rational combination of multiple sets of designer cells could permit the construction and regulation of higher-order systems with increased complexity, thereby enabling the molecular reprogramming of tissues, organisms or even populations with highest precision. Copyright © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  20. Secure web-based access to radiology: forms and databases for fast queries

    NASA Astrophysics Data System (ADS)

    McColl, Roderick W.; Lane, Thomas J.

    2002-05-01

    Currently, Web-based access to mini-PACS or similar databases commonly utilizes either JavaScript, Java applets or ActiveX controls. Many sites do not permit applets or controls or other binary objects for fear of viruses or worms sent by malicious users. In addition, the typical CGI query mechanism requires several parameters to be sent with the http GET/POST request, which may identify the patient in some way; this in unacceptable for privacy protection. Also unacceptable are pages produced by server-side scripts which can be cached by the browser, since these may also contain sensitive information. We propose a simple mechanism for access to patient information, including images, which guarantees security of information, makes it impossible to bookmark the page, or to return to the page after some defined length of time. In addition, this mechanism is simple, therefore permitting rapid access without the need to initially download an interface such as an applet or control. In addition to image display, the design of the site allows the user to view and save movies of multi-phasic data, or to construct multi-frame datasets from entire series. These capabilities make the site attractive for research purposes such as teaching file preparation.

  1. Laboratory Studies of Sea-Ice-Wave Interactions

    NASA Astrophysics Data System (ADS)

    Monty, J.; Meylan, M. H.; Babanin, A. V.; Toffoli, A.; Bennetts, L.

    2016-12-01

    A world-first facility for studying the Marginal Ice Zone has been constructed in the Michell Hydrodynamics Laboratory at the University of Melbourne. A 14m long wave tank (0.75m wide, 0.6m deep) resides in a freezer, where air temperature can be controlled down to -15C. This permits the freezing of the water surface. Large stainless steel ice-making trays (up to 4 m long) are also available to create ice of desired thickness and microstructure, which can be lowered onto the water surface. A computer controlled wave generator is capable of creating waves of any desired form. The temperature of the water in the tank can also be controlled between 2 and 30C. The tank frame is constructed of marine-treated wood and the entire tank is glass and acrylic, permitting the use of corrosive fluids, such as salt water. Here we present the first laboratory experiments of break-up of a controlled thickness, fresh water ice sheet impacted by regular and JONSWAP spectrum surface waves. The geometry of the resultant ice-floes is measured with high-resolution, time-resolved imaging, providing the crucial data of floe size distribution. Initial observations show that, in the case of high steepness waves, the primary mechanisms of ice break-up at the ice edge are overwash and rafting, both of which put weight on the ice interior to the ice-water interface. This additional weight (and impact in the case of rafting) breaks more ice, which allows overwash and rafting deeper into the ice sheet, breaking more ice and so on. For lower steepness waves, overwash and rafting are still present but far less significant. Finally, results of vertical ice movement using laser height gauges will be presented showing the attenuation of waves into an ice sheet and through a pack of ice floes. These results are compared with field data and theory available (e.g. Squire & Moore, Nature, 1980 and Kohout et al., Nature, 2014).

  2. 75 FR 65646 - Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... II of the Lompoc Wind Energy Project would involve the construction and operation of wind turbines... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-ES-2010-N235; 1112-0000-81440-F2] Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA AGENCY: U.S. Fish and...

  3. 75 FR 64863 - Prevention of Significant Deterioration (PSD) for Particulate Matter Less Than 2.5 Micrometers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... permit applicant's burden and streamline the permitting process for de minimis circumstances. These tools... pollutant is de minimis. An emission increase for a particular pollutant that is greater than the SER... construct, is less than the SMC, i.e., de minimis, and may be allowed to forego the preconstruction...

  4. 78 FR 52965 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ...-FF04EF2000] Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit... 1.49 acres of foraging, breeding, and sheltering habitat used by the Florida scrub-jay (Aphelocoma... taking 1.49 acre of Florida scrub-jay breeding, feeding, and sheltering habitat for construction of a...

  5. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...

  6. 78 FR 16565 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) and To Conduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Permits for the construction, connection, operation, or maintenance at the borders of the United States... Department for an amendment to their current Presidential Permit authorizing it to operate at a higher... address current and future demand by U.S. and Canada refineries for supplies of heavy crude oil from the...

  7. 77 FR 65305 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... incorporates District Rule 2410-- Prevention of Significant Deterioration (PSD)--into the California SIP to establish a PSD permit program for pre-construction review of certain new and modified major stationary... provides an adequate PSD permitting program as required by section 110 and part C of title I of the CAA...

  8. 78 FR 58270 - Cleveland National Forest, California, SDG&E Master Special Use Permit and Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ..., while providing for the operation and maintenance of the SDG&E electric powerline system. The project... communities, residents, businesses, and government owned facilities located within and adjacent to the... managed by the Bureau of Land Management (BLM); tribal lands of the La Jolla, Campo, Inaja, and Viejas...

  9. 76 FR 36917 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... business; (II) The Title V permit failed to provide for the control of mercury emissions, an air... Reasonably Available Control Technology for the control of carbon dioxide emissions or for mercury emissions...

  10. 40 CFR 455.41 - Special definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... being used contains the appropriate pollution control technologies (or equivalent systems/pesticide... appropriate permitting authority, e.g., the local Control Authority (the POTW) or NPDES permit writer which... written submission to the appropriate permitting authority, e.g., the local Control Authority (the POTW...

  11. 40 CFR 455.41 - Special definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... being used contains the appropriate pollution control technologies (or equivalent systems/pesticide... appropriate permitting authority, e.g., the local Control Authority (the POTW) or NPDES permit writer which... written submission to the appropriate permitting authority, e.g., the local Control Authority (the POTW...

  12. There and Back Again: An Acquisition Study

    ERIC Educational Resources Information Center

    Xu, Ting; Snyder, William

    2017-01-01

    When "again" modifies an English goal-PP construction, the sentence is ambiguous between a repetitive and a restitutive reading. Interestingly, languages vary in whether their counterpart to English "again" permits a restitutive reading with goal-PP constructions (Beck 2005; Beck & Snyder 2001). This article explores how…

  13. 7 CFR 1740.9 - Grant application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorized the initiation of digital broadcasting at the project sites. In the event that an FCC construction... advance of funds for that site conditional upon the submission of a construction permit. (j) Compliance... Digital Transition,” and must include the Environmental Questionnaire/Certification, available from RUS...

  14. [A gearing mechanism with 4 degrees of freedom for robotic applications in medicine].

    PubMed

    Pott, P; Weiser, P; Scharf, H P; Schwarz, M

    2004-06-01

    Applications in robot-aided surgery are currently based on modifications of manipulators used in industrial manufacturing processes. In this paper we describe novel rotatory kinematics for a manipulator, specially developed for deployment in robot-aided surgery. The construction of the gearing mechanism used for the positioning and orientation of a linkage point is described. Forward and inverse kinematics were calculated, and a constructive solution proposed. The gearing mechanism is based on two disk systems, each of which consists of two opposing rotatable discs. The construction was designed in such a way that the linkage point can be positioned freely anywhere within the mechanism's range of motion. The kinematics thus permits an x-y-positioning via rotating movements only. The spatial arrangement of two of such disc systems permits movements in four degrees of freedom (DOF). The construction is compact, but can be further miniaturized, is flexible and manufacturing costs are low. On the basis of this mechanical concept a new, small automated manipulator for surgical application will be developed.

  15. 40 CFR 455.41 - Special definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system being used contains the appropriate pollution control technologies (or equivalent systems... the appropriate permitting authority, e.g., the local Control Authority (the POTW) or NPDES permit... Control Authority (the POTW) or NPDES permit writer, which states that the P2 Alternative is being...

  16. 40 CFR 455.41 - Special definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... system being used contains the appropriate pollution control technologies (or equivalent systems... the appropriate permitting authority, e.g., the local Control Authority (the POTW) or NPDES permit... Control Authority (the POTW) or NPDES permit writer, which states that the P2 Alternative is being...

  17. 40 CFR 455.41 - Special definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system being used contains the appropriate pollution control technologies (or equivalent systems... the appropriate permitting authority, e.g., the local Control Authority (the POTW) or NPDES permit... Control Authority (the POTW) or NPDES permit writer, which states that the P2 Alternative is being...

  18. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  19. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  20. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  1. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  2. Do post-mining constructed channels replace functional characteristics of headwater streams?

    EPA Science Inventory

    Mountaintop mining and valley fill (MTMVF) is a method of coal mining common in eastern Kentucky and southern West Virginia. Over 1200 miles of stream channel have been buried by MTMVF. Permits for surface coal mining have recognized constructed drainage ditches associated with ...

  3. 40 CFR 71.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control agency for the area in which a part 71 permit, permit modification, or permit renewal is being... requirement of the program to control air pollution from outer continental shelf sources, under section 328 of... particular change. Delegate agency means the State air pollution control agency, local agency, other State...

  4. 40 CFR 71.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control agency for the area in which a part 71 permit, permit modification, or permit renewal is being... requirement of the program to control air pollution from outer continental shelf sources, under section 328 of... particular change. Delegate agency means the State air pollution control agency, local agency, other State...

  5. 40 CFR 71.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control agency for the area in which a part 71 permit, permit modification, or permit renewal is being... requirement of the program to control air pollution from outer continental shelf sources, under section 328 of... particular change. Delegate agency means the State air pollution control agency, local agency, other State...

  6. An SCR inverter for electric vehicles

    NASA Technical Reports Server (NTRS)

    Latos, T.; Bosack, D.; Ehrlich, R.; Jahns, T.; Mezera, J.; Thimmesch, D.

    1980-01-01

    An inverter for an electric vehicle propulsion application has been designed and constructed to excite a polyphase induction motor from a fixed propulsion battery source. The inverter, rated at 35kW peak power, is fully regenerative and permits vehicle operation in both the forward and reverse directions. Thyristors are employed as the power switching devices arranged in a dc bus commutated topology. This paper describes the major role the controller plays in generating the motor excitation voltage and frequency to deliver performance similar to dc systems. Motoring efficiency test data for the controller are presented. It is concluded that an SCR inverter in conjunction with an ac induction motor is a viable alternative to present dc vehicle propulsion systems on the basis of performance and size criteria.

  7. Specifications for and preliminary design of a plant growth chamber for orbital experimental experiments

    NASA Technical Reports Server (NTRS)

    Sweet, H. C.; Simmonds, R. C.

    1976-01-01

    It was proposed that plant experiments be performed on board the space shuttle. To permit the proper execution of most tests, the craft must contain a plant growth chamber which is adequately designed to control those environmental factors which can induce changes in a plant's physiology and morphology. The various needs of, and environmental factors affecting, plants are identified. The permissilbe design, construction and performance limits for a plant-growth chamber are set, and tentative designs were prepared for units which are compatible with both the botanical requirements and the constraints imposed by the space shuttle.

  8. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  9. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  10. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  11. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  12. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  13. 76 FR 3892 - Auction of FM Broadcast Construction Permits Rescheduled for April 27, 2011; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    .... The commenter also argues that, in the event that only one applicant places a bid on a permit, that...). The Commission makes no warranty whatsoever with respect to the FCC Auction System. In no event shall..., 2011 Short-Form Application (FCC Form 175) Filing Window Opens--January 31, 2011; 12 noon ET Short-Form...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, C.; Blake, C.; Burgess, R.

    This report explains the Regulations, Codes, and Standards (RCS) requirements for hydrogen dispensing stations in the State of California. The reports shows the basic components of a hydrogen dispensing station in a simple schematic drawing; the permits and approvals that would typically be required for the construction and operation of a hydrogen dispensing station; and a basic permit that might be employed by an Authority Having Jurisdiction (AHJ).

  15. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  16. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  18. Methods for generating or increasing revenues from crops

    DOEpatents

    Copenhaver, Gregory P.; Keith, Kevin; Preuss, Daphne

    2007-03-20

    The present invention provides methods of doing business and providing services. For example, methods of increasing the revenue of crops are provided. To this end, the method includes the use of a nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and mini chromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  19. 36 CFR 212.8 - Permission to cross lands and easements owned by the United States and administered by the Forest...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interests of the United States. Permits for such road construction or use will be non-exclusive and will be... States and administered by the Forest Service. (a) Permission to construct or use roads across lands and... benefit is needed by the United States, permission to construct or use a road across lands and across...

  20. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  1. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  2. Hybrid fuzzy sliding mode control for motorised space tether spin-up when coupled with axial and torsional oscillation

    NASA Astrophysics Data System (ADS)

    Chen, Yi; Cartmell, Matthew

    2010-03-01

    A specialised hybrid controller is applied to the control of a motorised space tether spin-up space coupled with an axial and a torsional oscillation phenomenon. A seven-degree-of-freedom (7-DOF) dynamic model of a motorised momentum exchange tether is used as the basis for interplanetary payload exchange in the context of control. The tether comprises a symmetrical double payload configuration, with an outrigger counter inertia and massive central facility. It is shown that including axial and torsional elasticity permits an enhanced level of performance prediction accuracy and a useful departure from the usual rigid body representations, particularly for accurate payload positioning at strategic points. A simulation with given initial condition data has been devised in a connecting programme between control code written in MATLAB and dynamics simulation code constructed within MATHEMATICA. It is shown that there is an enhanced level of spin-up control for the 7-DOF motorised momentum exchange tether system using the specialised hybrid controller.

  3. Safety yoke would protect construction workers from falling

    NASA Technical Reports Server (NTRS)

    Goforth, O. H.

    1967-01-01

    Simple dismountable yoke protects construction workers on narrow steel I beams at high levels. The yoke engages the upper flat of the I beam and slides freely along it to permit freedom of movement to the worker while limiting his ability to fall by a harness attached to the yoke.

  4. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  5. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  6. Advances in Microfluidic Platforms for Analyzing and Regulating Human Pluripotent Stem Cells

    PubMed Central

    Qian, Tongcheng; Shusta, Eric V.; Palecek, Sean P.

    2015-01-01

    Microfluidic devices employ submillimeter length scale control of flow to achieve high-resolution spatial and temporal control over the microenvironment, providing powerful tools to elucidate mechanisms of human pluripotent stem cell (hPSC) regulation and to elicit desired hPSC fates. In addition, microfluidics allow control of paracrine and juxtracrine signaling, thereby enabling fabrication of microphysiological systems comprised of multiple cell types organized into organs-on-a-chip. Microfluidic cell culture systems can also be integrated with actuators and sensors, permitting construction of high-density arrays of cell-based biosensors for screening applications. This review describes recent advances in using microfluidics to understand mechanisms by which the microenvironment regulates hPSC fates and applications of microfluidics to realize the potential of hPSCs for in vitro modeling and screening applications. PMID:26313850

  7. Large-area sheet task advanced dendritic web growth development

    NASA Technical Reports Server (NTRS)

    Duncan, C. S.; Seidensticker, R. G.; Mchugh, J. P.; Hopkins, R. H.; Meier, D. L.; Schruben, J.

    1982-01-01

    Thermal models were developed that accurately predict the thermally generated stresses in the web crystal which, if too high, cause the crystal to degenerate. The application of the modeling results to the design of low-stress experimental growth configurations will allow the growth of wider web crystals at higher growth velocities. A new experimental web growth machine was constructed. This facility includes all the features necessary for carrying out growth experiments under steady thermal conditions. Programmed growth initiation was developed to give reproducible crystal starts. Width control permits the growth of long ribbons at constant width. Melt level is controlled to 0.1 mm or better. Thus, the capability exists to grow long web crystals of constant width and thickness with little operator intervention, and web growth experiments can now be performed with growth variables controlled to a degree not previously possible.

  8. Discontinuation of approval of modifications in notes, guaranteed under Title VI or VII of the Public Health Service Act, proposed to permit use of the notes as collateral for tax-exempt financings--PHS. Final rule.

    PubMed

    1983-09-21

    The Department of Health and Human Services (HHS) adds a new section to regulations for making and guaranteeing loans for construction and modernization of hospitals and medical facilities and to regulations for guaranteeing loans for the construction of teaching facilities for health professions personnel. Under these regulations HHS will not approve the modification of the terms of an existing loan guaranteed under Title VI or Title VII of the Public Health Service (PHS) Act if the modification would permit use of the guarantee (or guaranteed loan) as collateral for tax-exempt financing.

  9. Comparison of free-piston Stirling engine model predictions with RE1000 engine test data

    NASA Technical Reports Server (NTRS)

    Tew, R. C., Jr.

    1984-01-01

    Predictions of a free-piston Stirling engine model are compared with RE1000 engine test data taken at NASA-Lewis Research Center. The model validation and the engine testing are being done under a joint interagency agreement between the Department of Energy's Oak Ridge National Laboratory and NASA-Lewis. A kinematic code developed at Lewis was upgraded to permit simulation of free-piston engine performance; it was further upgraded and modified at Lewis and is currently being validated. The model predicts engine performance by numerical integration of equations for each control volume in the working space. Piston motions are determined by numerical integration of the force balance on each piston or can be specified as Fourier series. In addition, the model Fourier analyzes the various piston forces to permit the construction of phasor force diagrams. The paper compares predicted and experimental values of power and efficiency and shows phasor force diagrams for the RE1000 engine displacer and piston. Further development plans for the model are also discussed.

  10. Supercharged two-cycle engines employing novel single element reciprocating shuttle inlet valve mechanisms and with a variable compression ratio

    NASA Technical Reports Server (NTRS)

    Wiesen, Bernard (Inventor)

    2008-01-01

    This invention relates to novel reciprocating shuttle inlet valves, effective with every type of two-cycle engine, from small high-speed single cylinder model engines, to large low-speed multiple cylinder engines, employing spark or compression ignition. Also permitting the elimination of out-of-phase piston arrangements to control scavenging and supercharging of opposed-piston engines. The reciprocating shuttle inlet valve (32) and its operating mechanism (34) is constructed as a single and simple uncomplicated member, in combination with the lost-motion abutments, (46) and (48), formed in a piston skirt, obviating the need for any complex mechanisms or auxiliary drives, unaffected by heat, friction, wear or inertial forces. The reciprocating shuttle inlet valve retains the simplicity and advantages of two-cycle engines, while permitting an increase in volumetric efficiency and performance, thereby increasing the range of usefulness of two-cycle engines into many areas that are now dominated by the four-cycle engine.

  11. Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Devenney, Martin; Gilliam, Ryan; Seeker, Randy

    2013-08-01

    The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less

  12. 21 CFR 1312.23 - Issuance of export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  13. 78 FR 32273 - Renewal of Agency Information Collection for Navajo Partitioned Lands Grazing Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... Permits authorized by OMB Control Number 1076-0162. This information collection expires May 31, 2013.... Data OMB Control Number: 1076-0162. Title: Navajo Partitioned Lands Grazing Permits, 25 CFR 161. Brief...

  14. An analytical and experimental investigation of flutter suppression via piezoelectric actuation

    NASA Technical Reports Server (NTRS)

    Heeg, Jennifer

    1992-01-01

    The objective of this research was to analytically and experimentally study the capabilities of adaptive material plate actuators for suppressing flutter. Piezoelectrics are materials which are characterized by their ability to produce voltage when subjected to a mechanical strain. The converse piezoelectric effect can be utilized to actuate a structure by applying a voltage. For this investigation, a two degree of freedom wind-tunnel model was designed, analyzed, and tested. The model consisted of a rigid wing and a flexible mount system which permitted translational and rotational degrees of freedom. Actuators, made of piezoelectric material were affixed to leaf springs on the mount system. Command signals, applied to the piezoelectric actuators, exerted control over the closed-loop damping and stiffness properties. A mathematical aeroservoelastic model was constructed using finite element and stiffness properties. A mathematical aeroservoelastic model was constructed using finite element methods, laminated plate theory, and aeroelastic analysis tools. A flutter suppression control law was designed, implemented on a digital control computer, and tested to conditions 20 percent above the passive flutter speed of the model. The experimental results represent the first time that adaptive materials have been used to actively suppress flutter. It demonstrates that small, carefully-placed actuating plates can be used effectively to control aeroelastic response.

  15. Battery cell feedthrough apparatus

    DOEpatents

    Kaun, Thomas D.

    1995-01-01

    A compact, hermetic feedthrough apparatus comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance.

  16. 78 FR 24229 - Renewal of Agency Information Collection for Grazing Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ...) approval for the collection of information for Grazing Permits authorized by OMB Control Number 1076- 0157... guarantee that we will be able to do so. III. Data OMB Control Number: 1076-0157. Title: Grazing Permits, 25...

  17. A novel flow-perfusion bioreactor supports 3D dynamic cell culture.

    PubMed

    Sailon, Alexander M; Allori, Alexander C; Davidson, Edward H; Reformat, Derek D; Allen, Robert J; Warren, Stephen M

    2009-01-01

    Bone engineering requires thicker three-dimensional constructs than the maximum thickness supported by standard cell-culture techniques (2 mm). A flow-perfusion bioreactor was developed to provide chemotransportation to thick (6 mm) scaffolds. Polyurethane scaffolds, seeded with murine preosteoblasts, were loaded into a novel bioreactor. Control scaffolds remained in static culture. Samples were harvested at days 2, 4, 6, and 8 and analyzed for cellular distribution, viability, metabolic activity, and density at the periphery and core. By day 8, static scaffolds had a periphery cell density of 67% +/- 5.0%, while in the core it was 0.3% +/- 0.3%. Flow-perfused scaffolds demonstrated peripheral cell density of 94% +/- 8.3% and core density of 76% +/- 3.1% at day 8. Flow perfusion provides chemotransportation to thick scaffolds. This system may permit high throughput study of 3D tissues in vitro and enable prefabrication of biological constructs large enough to solve clinical problems.

  18. December 30, 2003 Petition Requesting the Administrator Object to Chemical Lime Company's and Granite Construction Company's Apex Facility's Title V Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. Economic implications of incorporating emission controls to mitigate air pollutants emitted from a modeled hydrocarbon-fuel biorefinery in the United States

    DOE PAGES

    Bhatt, Arpit; Zhang, Yimin; Davis, Ryan; ...

    2016-07-15

    The implementation of the US Renewable Fuel Standard is expected to increase the construction and operation of new biofuel facilities. Allowing this industry to grow without adversely affecting air quality is an important sustainability goal sought by multiple stakeholders. However, little is known about how the emission controls potentially required to comply with air quality regulations might impact biorefinery cost and deployment strategies such as siting and sizing. In this study, we use a baseline design for a lignocellulosic hydrocarbon biofuel production process to assess how the integration of emission controls impacts the minimum fuel selling price (MFSP) of themore » biofuel produced. We evaluate the change in MFSP for two cases as compared to the baseline design by incorporating (i) emission controls that ensure compliance with applicable federal air regulations and (ii) advanced control options that could be used to achieve potential best available control technology (BACT) emission limits. Our results indicate that compliance with federal air regulations can be achieved with minimal impact on biofuel cost (~$0.02 per gasoline gallon equivalent (GGE) higher than the baseline price of $5.10 GGE -1). However, if air emissions must be further reduced to meet potential BACT emission limits, the cost could increase nontrivially. For example, the MFSP could increase to $5.50 GGE -1 by adopting advanced emission controls to meet potential boiler BACT limits. Finally, given tradeoffs among emission control costs, permitting requirements, and economies of scale, these results could help inform decisions about biorefinery siting and sizing and mitigate risks associated with air permitting.« less

  20. 10 CFR 50.33 - Contents of applications; general information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (e) The class of license applied for, the use to which the facility will be put, the period of time... applicable, the following should be provided: (1) If the application is for a construction permit, the... assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle...

  1. 75 FR 30057 - Proposed Issuance of an Incidental Take Permit to Energy Northwest for Construction and Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... consist of up to 32 wind turbines with a generating capacity of 82 megawatts (MW) of electricity. Power generated by the wind turbines would be transmitted to the existing Bonneville Power Administration... conjunction with the construction, operation, maintenance, and decommissioning of the Radar Ridge Wind Project...

  2. 40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... technologies, operational measures, or restoration measures should be included in the permit to meet the... evaluate the performance of the design and construction technologies, operational measures, and/or... construction technologies, operational measure, and/or restoration measures, and/or improved operation and...

  3. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  4. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  5. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  6. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  7. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may...

  8. 76 FR 16440 - Endangered and Threatened Wildlife and Plants; Permits, Town of Apple Valley, San Bernardino...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...

  9. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  10. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  11. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  12. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  13. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  14. On the next generation of reliability analysis tools

    NASA Technical Reports Server (NTRS)

    Babcock, Philip S., IV; Leong, Frank; Gai, Eli

    1987-01-01

    The current generation of reliability analysis tools concentrates on improving the efficiency of the description and solution of the fault-handling processes and providing a solution algorithm for the full system model. The tools have improved user efficiency in these areas to the extent that the problem of constructing the fault-occurrence model is now the major analysis bottleneck. For the next generation of reliability tools, it is proposed that techniques be developed to improve the efficiency of the fault-occurrence model generation and input. Further, the goal is to provide an environment permitting a user to provide a top-down design description of the system from which a Markov reliability model is automatically constructed. Thus, the user is relieved of the tedious and error-prone process of model construction, permitting an efficient exploration of the design space, and an independent validation of the system's operation is obtained. An additional benefit of automating the model construction process is the opportunity to reduce the specialized knowledge required. Hence, the user need only be an expert in the system he is analyzing; the expertise in reliability analysis techniques is supplied.

  15. Wave Phase-Sensitive Transformation of 3d-Straining of Mechanical Fields

    NASA Astrophysics Data System (ADS)

    Smirnov, I. N.; Speranskiy, A. A.

    2015-11-01

    It is the area of research of oscillatory processes in elastic mechanical systems. Technical result of innovation is creation of spectral set of multidimensional images which reflect time-correlated three-dimensional vector parameters of metrological, and\\or estimated, and\\or design parameters of oscillations in mechanical systems. Reconstructed images of different dimensionality integrated in various combinations depending on their objective function can be used as homeostatic profile or cybernetic image of oscillatory processes in mechanical systems for an objective estimation of current operational conditions in real time. The innovation can be widely used to enhance the efficiency of monitoring and research of oscillation processes in mechanical systems (objects) in construction, mechanical engineering, acoustics, etc. Concept method of vector vibrometry based on application of vector 3D phase- sensitive vibro-transducers permits unique evaluation of real stressed-strained states of power aggregates and loaded constructions and opens fundamental innovation opportunities: conduct of continuous (on-line regime) reliable monitoring of turboagregates of electrical machines, compressor installations, bases, supports, pipe-lines and other objects subjected to damaging effect of vibrations; control of operational safety of technical systems at all the stages of life cycle including design, test production, tuning, testing, operational use, repairs and resource enlargement; creation of vibro-diagnostic systems of authentic non-destructive control of anisotropic characteristics of materials resistance of power aggregates and loaded constructions under outer effects and operational flaws. The described technology is revolutionary, universal and common for all branches of engineering industry and construction building objects.

  16. 77 FR 23803 - Office of Hazardous Materials Safety; Actions on Special Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... MODIFICATION SPECIAL PERMIT GRANTED 8826-M Phoenix Air 49 CFR 172.101; To modify the Group, Inc. 172.204(c)(3...-M......... Conference of 49 CFR To modify the Radiation 172.203(d); special permit add Control Part............ Conference of 49 CFR Part To modify the Radiation 172, Subparts, special permit add Control C, D, E, F, G, 49...

  17. Conceptual design of a mobile remote manipulator system

    NASA Technical Reports Server (NTRS)

    Bush, H. G.; Mikulas, M. M., Jr.; Wallsom, R. E.; Jensen, J. K.

    1984-01-01

    A mobile remote manipulator system has been identified as a necessary device for space station. A conceptual design for an MRMS is presented which features (1) tracks on the MRMS and guide pins only on the truss structure, (2) a push/pull drive mechanism which rotates to permit movement in four directions, and (3) spacecrane and mobile foot restraint manipulators (or arms). Operational and design features of the MRMS elements are described and illustrated. Concepts are also presented which permit rotating the operational plane of the MRMS through 90 deg. Such a system has been found to have great utility for initial space station construction, maintenance and repair, and to provide a construction capability for future station growth or large spacecraft assembly and/or servicing.

  18. Neurobiology of emotions: an update.

    PubMed

    Esperidião-Antonio, Vanderson; Majeski-Colombo, Marilia; Toledo-Monteverde, Diana; Moraes-Martins, Glaciele; Fernandes, Juliana José; Bauchiglioni de Assis, Marjorie; Montenegro, Stefânia; Siqueira-Batista, Rodrigo

    2017-06-01

    The 'nature' of emotions is one of the archaic themes of Western thought, thematized in different cultural manifestations - such as art, science, philosophy, myths and religion -, since Ancient times. In the last decades, the advances in neurosciences have permitted the construction of hypotheses that explain emotions, especially through the studies involving the limbic system. To present an updated discussion about the neurobiology of processes relating to emotions - focusing (1) on the main neural structures that relate to emotions, (2) the paths and circuits of greater relevance, (3) the implicated neurotransmitters, (4) the connections that possess neurovegetative control and (5) the discussion about the main emotions - is the objective of this present article.

  19. Rocket instrument for far-UV spectrophotometry of faint astronomical objects.

    PubMed

    Hartig, G F; Fastie, W G; Davidsen, A F

    1980-03-01

    A sensitive sounding rocket instrument for moderate (~10-A) resolution far-UV (lambda1160-lambda1750-A) spectrophotometry of faint astronomical objects has been developed. The instrument employs a photon-counting microchannel plate imaging detector and a concave grating spectrograph behind a 40-cm Dall-Kirkham telescope. A unique remote-control pointing system, incorporating an SIT vidicon aspect camera, two star trackers, and a tone-encoded command telemetry link, permits the telescope to be oriented to within 5 arc sec of any target for which suitable guide stars can be found. The design, construction, calibration, and flight performance of the instrument are discussed.

  20. Visual enhancements in pick-and-place tasks: Human operators controlling a simulated cylindrical manipulator

    NASA Technical Reports Server (NTRS)

    Kim, Won S.; Tendick, Frank; Stark, Lawrence

    1989-01-01

    A teleoperation simulator was constructed with vector display system, joysticks, and a simulated cylindrical manipulator, in order to quantitatively evaluate various display conditions. The first of two experiments conducted investigated the effects of perspective parameter variations on human operators' pick-and-place performance, using a monoscopic perspective display. The second experiment involved visual enhancements of the monoscopic perspective display, by adding a grid and reference lines, by comparison with visual enhancements of a stereoscopic display; results indicate that stereoscopy generally permits superior pick-and-place performance, but that monoscopy nevertheless allows equivalent performance when defined with appropriate perspective parameter values and adequate visual enhancements.

  1. Translocation of single-stranded DNA through single-walled carbon nanotubes.

    PubMed

    Liu, Haitao; He, Jin; Tang, Jinyao; Liu, Hao; Pang, Pei; Cao, Di; Krstic, Predrag; Joseph, Sony; Lindsay, Stuart; Nuckolls, Colin

    2010-01-01

    We report the fabrication of devices in which one single-walled carbon nanotube spans a barrier between two fluid reservoirs, enabling direct electrical measurement of ion transport through the tube. A fraction of the tubes pass anomalously high ionic currents. Electrophoretic transport of small single-stranded DNA oligomers through these tubes is marked by large transient increases in ion current and was confirmed by polymerase chain reaction analysis. Each current pulse contains about 10(7) charges, an enormous amplification of the translocated charge. Carbon nanotubes simplify the construction of nanopores, permit new types of electrical measurements, and may open avenues for control of DNA translocation.

  2. Endurance testing of a 30-cm Kaufman thruster

    NASA Technical Reports Server (NTRS)

    Collett, C. R.

    1973-01-01

    Results of a program to demonstrate lifetime capability of a 30-cm Kaufman ion thruster with a 6000 hour endurance test are described. Included in the program are (1) thruster fabrication, (2) design and construction of a test console containing a transistorized high frequency power processor, and control circuits which provide unattended automatic operation of the thruster, and (3) modification of a vacuum facility to incorporate a frozen mercury collector and permit unattended operation. Four tests ranging in duration from 100 to 1100 hours have been completed. These tests and the resulting thruster modifications are described. The status of the endurance test is also presented.

  3. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  4. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  5. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  6. Battery cell feedthrough apparatus

    DOEpatents

    Kaun, T.D.

    1995-03-14

    A compact, hermetic feedthrough apparatus is described comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance. 8 figs.

  7. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  8. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  9. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  10. Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows

    DTIC Science & Technology

    2017-07-01

    greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health

  11. 40 CFR Table 1 to Subpart Ggg of... - General Provisions Applicability to Subpart GGG

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Yes 63.1(d) [Reserved] NA 63.1(e) Applicability of permit program before a relevant standard has been...) [Reserved] NA 63.5(b)(3) New construction/reconstruction Yes Except for changes and additions authorized... Yes 63.5(c) [Reserved] NA 63.5(d) Application for approval of construction/reconstruction Yes Except...

  12. 40 CFR Table 1 to Subpart Ggg of... - General Provisions Applicability to Subpart GGG

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Yes 63.1(d) [Reserved] NA 63.1(e) Applicability of permit program before a relevant standard has been...) [Reserved] NA 63.5(b)(3) New construction/reconstruction Yes Except for changes and additions authorized... Yes 63.5(c) [Reserved] NA 63.5(d) Application for approval of construction/reconstruction Yes Except...

  13. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  14. The Construction of an Organizational Climate Description Questionnaire for Academic Departments in Colleges and Universities.

    ERIC Educational Resources Information Center

    Borrevik, Berge Andrew, Jr.

    The purpose of this investigation was to construct an Organizational Climate Description Questionnaire-Higher Education that would permit portrayal of the organizational climate of academic departments within colleges and universities. Data collected from the completion of pilot and research instruments was obtained from the faculty members in 72…

  15. Combustor liner construction

    NASA Technical Reports Server (NTRS)

    Craig, H. M.; Wagner, W. B.; Strock, W. J. (Inventor)

    1983-01-01

    A combustor liner is fabricated from a plurality of individual segments each containing counter/parallel Finwall material and are arranged circumferentially and axially to define the combustion zone. Each segment is supported by a hook and ring construction to an opened lattice frame with sufficient tolerance between the hook and ring to permit thermal expansion with a minimum of induced stresses.

  16. 76 FR 52344 - Application for an Incidental Take Permit for the Madison Cave Isopod From Dominion Virginia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... gas-fired combined-cycle power station in Warren County, Virginia, extending over the next 9 years... construction of a new natural gas-fired combined-cycle power station in Warren County, Virginia. A conservation... cause take of the Madison Cave isopod. Dominion Virginia Power proposes to construct a natural gas-fired...

  17. 31 CFR 592.201 - Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of any rough diamond; permitted importation or exportation of any rough diamond. 592.201 Section 592... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY ROUGH DIAMONDS CONTROL REGULATIONS Prohibitions § 592.201 Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

  18. 31 CFR 592.201 - Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of any rough diamond; permitted importation or exportation of any rough diamond. 592.201 Section 592... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY ROUGH DIAMONDS CONTROL REGULATIONS Prohibitions § 592.201 Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

  19. 31 CFR 592.201 - Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of any rough diamond; permitted importation or exportation of any rough diamond. 592.201 Section 592... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY ROUGH DIAMONDS CONTROL REGULATIONS Prohibitions § 592.201 Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

  20. 31 CFR 592.201 - Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of any rough diamond; permitted importation or exportation of any rough diamond. 592.201 Section 592... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY ROUGH DIAMONDS CONTROL REGULATIONS Prohibitions § 592.201 Prohibited importation and exportation of any rough diamond; permitted importation or exportation...

  1. 21 CFR 358.720 - Permitted combinations of active ingredients.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 5 2014-04-01 2014-04-01 false Permitted combinations of active ingredients. 358... Permitted combinations of active ingredients. (a) Combination of active ingredients for the control of... labeled according to § 358.750. (b) Combination of control of dandruff and external analgesic active...

  2. 21 CFR 358.720 - Permitted combinations of active ingredients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 358... Permitted combinations of active ingredients. (a) Combination of active ingredients for the control of... labeled according to § 358.750. (b) Combination of control of dandruff and external analgesic active...

  3. 21 CFR 358.720 - Permitted combinations of active ingredients.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 5 2012-04-01 2012-04-01 false Permitted combinations of active ingredients. 358... Permitted combinations of active ingredients. (a) Combination of active ingredients for the control of... labeled according to § 358.750. (b) Combination of control of dandruff and external analgesic active...

  4. 21 CFR 358.720 - Permitted combinations of active ingredients.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 5 2011-04-01 2011-04-01 false Permitted combinations of active ingredients. 358... Permitted combinations of active ingredients. (a) Combination of active ingredients for the control of... labeled according to § 358.750. (b) Combination of control of dandruff and external analgesic active...

  5. 21 CFR 358.720 - Permitted combinations of active ingredients.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 5 2013-04-01 2013-04-01 false Permitted combinations of active ingredients. 358... Permitted combinations of active ingredients. (a) Combination of active ingredients for the control of... labeled according to § 358.750. (b) Combination of control of dandruff and external analgesic active...

  6. Monitoring Knowledge Base (MKB)

    EPA Pesticide Factsheets

    The Monitoring Knowledge Base (MKB) is a compilation of emissions measurement and monitoring techniques associated with air pollution control devices, industrial process descriptions, and permitting techniques, including flexible permit development. Using MKB, one can gain a comprehensive understanding of emissions sources, control devices, and monitoring techniques, enabling one to determine appropriate permit terms and conditions.

  7. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  8. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  9. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ...-1231-9BPP] RIN 1018-AZ16 Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven... requirements of the Migratory Bird Permits Program and assigned OMB control number 1018- 0022, which expires... chapter I, title 50 of the Code of Federal Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1...

  10. Outdoor Advertising Control

    DOT National Transportation Integrated Search

    2002-04-22

    The State of Montana agreed to provide "effective control" of outdoor adervtising by establishing a sign permit system; maintenance of an inventory of all permitted signs, and a periodic surveillance of the controlled routes to disvover unlawful sign...

  11. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  12. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  13. Fixed-Order Mixed Norm Designs for Building Vibration Control

    NASA Technical Reports Server (NTRS)

    Whorton, Mark S.; Calise, Anthony J.

    2000-01-01

    This study investigates the use of H2, mu-synthesis, and mixed H2/mu methods to construct full order controllers and optimized controllers of fixed dimensions. The benchmark problem definition is first extended to include uncertainty within the controller bandwidth in the form of parametric uncertainty representative of uncertainty in the natural frequencies of the design model. The sensitivity of H2 design to unmodeled dynamics and parametric uncertainty is evaluated for a range of controller levels of authority. Next, mu-synthesis methods are applied to design full order compensators that are robust to both unmodeled dynamics and to parametric uncertainty. Finally, a set of mixed H2/mu compensators are designed which are optimized for a fixed compensator dimension. These mixed norm designs recover the H2 design performance levels while providing the same levels of robust stability as the mu designs. It is shown that designing with the mixed norm approach permits higher levels of controller authority for which the H2 designs are destabilizing. The benchmark problem is that of an active tendon system. The controller designs are all based on the use of acceleration feedback.

  14. 47 CFR 32.2423 - Buried cable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2423 Buried cable. (a... of cleaning manholes and ducts in connection with construction work and the cost of permits and...

  15. 33 CFR 323.3 - Discharges requiring permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...

  16. 33 CFR 323.3 - Discharges requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...

  17. RACT/BACT/LAER Clearninghouse (RBLC)

    EPA Pesticide Factsheets

    OAR's RACT, BACT, LAER Clearinghouse (RBLC) data asset contains summary information on selected air permitting actions from EPA, state, and local permitting agencies across the U.S., as well as a number of international permit records supplied by air pollution control agencies in Mexico and Canada. The acronyms refer to program requirements of the New Source Review (NSR) program: RACT is Reasonably Available Control Technology and applies to existing sources in areas that are not meeting national ambient air quality standards (i.e., non-attainment areas); BACT is Best Available Control Technology and applies to major new or modified sources in clean areas (i.e., attainment areas). LAER, or Lowest Achievable Emission Rate, is required on major new or modified sources in non-attainment areas. As of 2012, RBLC includes approximately 6,500 entries. With the exception of LAER permit determinations, whose inclusion in RBLC is mandatory, participation is voluntary. Coverage is therefore not complete or necessarily representative.Required under Section 108 of the 1990 Amendments to the Clean Air Act, RBLC provides users 00e2?? typically permit writers, permit applicants or holders, and the public 00e2?? with references and personal contacts to support ongoing air pollution control activities. Information is detailed enough for users to know whether a permit is applicable to their needs. Users may then contact the appropriate agency to access the permit or discuss it wit

  18. 78 FR 42520 - Control Technology, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... Technology, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 18, 2012, Control Technology, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study...

  19. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  20. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  1. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  2. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  3. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  4. Automated Item Banking and Test Development. Final Technical Paper for Period October 1987-April 1988.

    ERIC Educational Resources Information Center

    Lee, William M.; And Others

    Projects to develop an automated item banking and test development system have been undertaken on several occasions at the Air Force Human Resources Laboratory (AFHRL) throughout the past 10 years. Such a system permits the construction of tests in far less time and with a higher degree of accuracy than earlier test construction procedures. This…

  5. 77 FR 51981 - Notice of Intent To Prepare a Draft Environmental Impact Statement on the Construction and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... assist in meeting State of Florida water quality standards by attenuating peak stormwater flows and... Area A1 Flow Equalization Basin, Palm Beach County, FL AGENCY: Department of the Army, U.S. Army Corps...) permit under Section 404 of the Clean Water Act for construction and operation of a Flow Equalization...

  6. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  7. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  8. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  9. Technology requirements for large flexible space structures

    NASA Technical Reports Server (NTRS)

    Wada, B. K.; Freeland, R. E.; Garcia, N. F.

    1983-01-01

    Research, test, and demonstration experiments necessary for establishing a data base that will permit construction of large, lightweight flexible space structures meeting on-orbit pointing and surface precesion criteria are discussed. Attention is focused on the wrap-rib proof-of-concept antenna structures developed from technology used on the ATS-6 satellite. The target structure will be up to 150 m in diameter or smaller, operate at RF levels, be amenable to packaging for carriage in the Shuttle bay, be capable of being ground-tested, and permit on-orbit deployment and retraction. Graphite/epoxy has been chosen as the antenna ribs material, and the antenna mesh will be gold-plated Mo wire. A 55-m diam reflector was built as proof-of-concept with ground-test capability. Tests will proceed on components, a model, the entire structure, and in-flight. An analytical model has been formulated to characterize the antenna's thermal behavior. The flight test of the 55-m prototype in-orbit offers the chance to validate the analytical model and characterize the control, mechanical, and thermal characteristics of the antenna configuration.

  10. Quality control in diagnostic immunohistochemistry: integrated on-slide positive controls.

    PubMed

    Bragoni, A; Gambella, A; Pigozzi, S; Grigolini, M; Fiocca, R; Mastracci, L; Grillo, F

    2017-11-01

    Standardization in immunohistochemistry is a priority in modern pathology and requires strict quality control. Cost containment has also become fundamental and auditing of all procedures must take into account both these principles. Positive controls must be routinely performed so that their positivity guarantees the appropriateness of the immunohistochemical procedure. The aim of this study is to develop a low cost (utilizing a punch biopsy-PB-tool) procedure to construct positive controls which can be integrated in the patient's tissue slide. Sixteen frequently used control blocks were selected and multiple cylindrical samples were obtained using a 5-mm diameter punch biopsy tool, separately re-embedding them in single blocks. For each diagnostic immunoreaction requiring a positive control, an integrated PB-control section (cut from the appropriate PB-control block) was added to the top right corner of the diagnostic slide before immunostaining. This integrated control technique permitted a saving of 4.75% in total direct lab costs and proved to be technically feasible and reliable. Our proposal is easy to perform and within the reach of all pathology labs, requires easily available tools, its application costs is less than using external paired controls and ensures that a specific control for each slide is always available.

  11. Box Cello Middle School Science Clubs

    NASA Astrophysics Data System (ADS)

    Vandegrift, Guy

    1998-10-01

    The Box Cello is a middle school science club which is attempting to (1) understand the cello and (2) design a low-cost starter instrument. We can support and justify this research by adding a third goal: (3) to help supply local science classes with equipment. My policy of spending one entire day each week away from the university, out in a local school is essential to this project. This schedule also permits me to conduct lessons on optics and music in the schools. And, it permits circulation of tools and equipment. A simple calculation demonstrates the great economy achieved by combining science clubs with academic year school visits. Consider the cost of letting 10,000 students in 10 middle schools each learn about and play with a pair of "upside-down" glasses for one hour. A visit to each school for three consecutive weeks would easily permit such a circulation if only 30 pairs were constructed. Assume rhetorically, that the construction of 30 pairs of glasses were to consume the entire estimated annual budget of $100,000. The cost per student would be only ten dollars! The visits, guest lectures, and equipment loans permit informal networking (including lunch) with math, science and music teachers in 10 schools. For more information, visit the http://www.utep.edu/boxcello/

  12. 78 FR 19649 - Proposed Information Collection; Comment Request; Southwest Region Permit Family of Forms

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... Federally-managed fisheries off the West Coast. There are three types of permits: Basic fishery permits for... fishing permits (EFPs). Appeals and certain waiver requests may also be submitted. Transfer applications... Species permits by April 30, 2013. III. Data OMB Control Number: 0648-0204. Form Number: None. Type of...

  13. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  14. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  15. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  16. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  17. A reagent-controlled SN2-glycosylation for the direct synthesis of β-linked 2-deoxy-sugars.

    PubMed

    Issa, John Paul; Bennett, Clay S

    2014-04-16

    The efficient and stereoselective construction of glycosidic linkages remains one of the most formidable challenges in organic chemistry. This is especially true in cases such as β-linked deoxy-sugars, where the outcome of the reaction cannot be controlled using the stereochemical information intrinsic to the glycosyl donor. Here we show that p-toluenesulfonic anhydride activates 2-deoxy-sugar hemiacetals in situ as electrophilic species, which react stereoselectively with nucleophilic acceptors to produce β-anomers exclusively. NMR studies confirm that, under these conditions, the hemiacetal is quantitatively converted into an α-glycosyl tosylate, which is presumably the reactive species in the reaction. This approach demonstrates that use of promoters that activate hemiacetals as well-defined intermediates can be used to permit stereoselective glycosylation through an SN2-pathway.

  18. 40 CFR 144.34 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.34 Emergency permits. (a) Coverage... unless a temporary emergency permit is granted; or (2) A substantial and irretrievable loss of oil or gas...

  19. 33 CFR 322.3 - Activities requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... States that are part of the civil works activities of the Corps of Engineers, unless covered by a... separate regulations. Agreement for construction or engineering services performed for other agencies by...

  20. 33 CFR 322.3 - Activities requiring permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... States that are part of the civil works activities of the Corps of Engineers, unless covered by a... separate regulations. Agreement for construction or engineering services performed for other agencies by...

  1. Camera Control and Geo-Registration for Video Sensor Networks

    NASA Astrophysics Data System (ADS)

    Davis, James W.

    With the use of large video networks, there is a need to coordinate and interpret the video imagery for decision support systems with the goal of reducing the cognitive and perceptual overload of human operators. We present computer vision strategies that enable efficient control and management of cameras to effectively monitor wide-coverage areas, and examine the framework within an actual multi-camera outdoor urban video surveillance network. First, we construct a robust and precise camera control model for commercial pan-tilt-zoom (PTZ) video cameras. In addition to providing a complete functional control mapping for PTZ repositioning, the model can be used to generate wide-view spherical panoramic viewspaces for the cameras. Using the individual camera control models, we next individually map the spherical panoramic viewspace of each camera to a large aerial orthophotograph of the scene. The result provides a unified geo-referenced map representation to permit automatic (and manual) video control and exploitation of cameras in a coordinated manner. The combined framework provides new capabilities for video sensor networks that are of significance and benefit to the broad surveillance/security community.

  2. 30 CFR 905.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 42 U.S.C. 7401 et seq California Air Pollution Control Laws, Cal. Health & Safety Code section 39000... (11) Noise Control Act, 42 U.S.C. 4903 California Noise Control Act of 1973, Cal. Health & Safety Code... Pollution Control Laws, Cal. Health & Safety Code section 39000 et seq.; the Hazardous Waste Control Law...

  3. Large Advanced Space Systems (LASS) computer-aided design program additions

    NASA Technical Reports Server (NTRS)

    Farrell, C. E.

    1982-01-01

    The LSS preliminary and conceptual design requires extensive iteractive analysis because of the effects of structural, thermal, and control intercoupling. A computer aided design program that will permit integrating and interfacing of required large space system (LSS) analyses is discussed. The primary objective of this program is the implementation of modeling techniques and analysis algorithms that permit interactive design and tradeoff studies of LSS concepts. Eight software modules were added to the program. The existing rigid body controls module was modified to include solar pressure effects. The new model generator modules and appendage synthesizer module are integrated (interfaced) to permit interactive definition and generation of LSS concepts. The mass properties module permits interactive specification of discrete masses and their locations. The other modules permit interactive analysis of orbital transfer requirements, antenna primary beam n, and attitude control requirements.

  4. Unique construction makes interferometer insensitive to mechanical stresses

    NASA Technical Reports Server (NTRS)

    Beer, R.

    1965-01-01

    Michelson-type interferometer with a cat-eye reflector operates effectively even in the presence of random mechanical stresses. A cubical beamsplitter with dichroic surfaces permits operation in infrared or visible light.

  5. 78 FR 72830 - Migratory Bird Permits; Delegating Falconry Permitting Authority to 17 States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...-0110; FF09M21200-134-FXMB1231099BPP0] RIN 1018-BA01 Migratory Bird Permits; Delegating Falconry... Migratory Bird Permits Program and assigned OMB control number 1018-0022, which expires February 28, 2014... Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1. The authority citation for part 21 continues to...

  6. A novel field generator for magnetic stimulation in cell culture experiments.

    PubMed

    Vogt, G; Schrefl, A; Mitteregger, R; Falkenhagen, D

    1997-06-01

    A novel field generator specially designed to examine the influence of low frequency magnetic fields on specific cell material was constructed and characterized. The exposure unit described in this paper consists of a controller unit and three sets of coils. The field generator permits a precious definition of the revelant signal parameters and allows the superposition of alternating current (AC) and direct current (DC) magnetic fields. Critical system parameters were monitored continuously. The three sets of coils, each arranged in the Helmholtz Configuration were characterized. After data processing and visualization the results showed a constant and homogeneous field within the experimental area. The special coil design also allows their use in an incubator.

  7. A magnetically suspended linearly driven cryogenic refrigerator

    NASA Technical Reports Server (NTRS)

    Stolfi, F.; Goldowsky, M.; Ricciardelli, J.; Shapiro, P.

    1983-01-01

    This paper described a novel Stirling cycle cryogenic refrigerator which was designed, fabricated and successfully tested at Philips Laboratories. The prominent features of the machine are an electro-magnetic bearing system, a pair of moving magnet linear motors, and clearance seals with a 25 mu m radial gap. The all-metal and ceramic construction eliminates long-term organic contamination of the helium working fluid. The axial positions of the piston and displacer are electronically controlled, permitting independent adjustment of the amplitude of each and their relative phase relationship during operation. A simple passive counterbalance reduces axial vibrations. The design of the refrigerator system components is discussed and a comparison is made between performance estimates and measured results.

  8. Dynamic thermoregulation of the sample in flow cytometry.

    PubMed

    Graves, Steven W; Habbersett, Robert C; Nolan, John P

    2002-05-01

    Fine control of temperature is an important capability for any analytical platform. A circulating water bath has been the traditional means of maintaining constant temperature in the sample chamber of a flow cytometer, but this approach does not permit rapid changes in sample temperature. This unit explains the use of Peltier modules for regulation of sample temperature. The heat pumping generated by the passage of current through properly matched semiconductors, known as the Peltier effect, makes it possible for these thermoelectric modules to both heat and cool. The authors describe the construction of a Peltier module based thermoregulation unit in step-by-step detail and present a demonstration of flow cytometry measurements as a function of temperature.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, Ian

    To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

  10. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  11. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  12. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  13. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  14. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  15. Video display engineering and optimization system

    NASA Technical Reports Server (NTRS)

    Larimer, James (Inventor)

    1997-01-01

    A video display engineering and optimization CAD simulation system for designing a LCD display integrates models of a display device circuit, electro-optics, surface geometry, and physiological optics to model the system performance of a display. This CAD system permits system performance and design trade-offs to be evaluated without constructing a physical prototype of the device. The systems includes a series of modules which permit analysis of design trade-offs in terms of their visual impact on a viewer looking at a display.

  16. Source Construction Prior to Issuance of PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Permitting Multi-Phase Construction Under PSD Regulations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Final Environmental Impact Statement Permit Application by United States Steel Corp. Proposed Lake Front Steel Mill, Conneaut, Ohio. Volume 1,

    DTIC Science & Technology

    1979-04-01

    FRONT STEEL MILL CONNEAUT, OHIO 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(a) S. CONTRACT OR GRANT NUMBERS) Paul G. Leuchner and Gregory P. Keppel... PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK AREA & WORK UNIT NUMBERS U.S. Army Engineer District, Buffalo 1776 Niagara...the Army permit to perform certain work in Lake Erie and its tributaries. Activities proposed by the applicant include the construction of a water

  19. 34 CFR 104.23 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... effective date of this part in a manner that affects or could affect the usability of the facility or part... use of other methods are permitted where substantially equivalent or greater access to and usability...

  20. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effective date of this subpart in a manner that affects or could affect the usability of the facility or... use of other methods are permitted where substantially equivalent or greater access to and usability...

  1. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...

  2. 34 CFR 104.23 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... effective date of this part in a manner that affects or could affect the usability of the facility or part... use of other methods are permitted where substantially equivalent or greater access to and usability...

  3. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  4. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  5. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  6. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  7. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... effective date of this subpart in a manner that affects or could affect the usability of the facility or... use of other methods are permitted where substantially equivalent or greater access to and usability...

  8. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...

  9. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  10. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  11. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  12. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  13. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  14. 10 CFR 2.649 - Partial decisions on limited work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations Phased Applications... same time as in the case of a full decision relating to the issuance of a construction permit or...

  15. 77 FR 64844 - Notice of Application for Special Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... construction, specifically duplex stainless steels. (mode 1) 15716-N Department of 49 CFR 49 CFR Sec. To authorize the Energy, 173.310. transportation in Washington, DC. commerce of boron trifluoride in radiation...

  16. Estimating the discharge for ordinary high water levels in Kansas.

    DOT National Transportation Integrated Search

    2014-09-01

    The water resource design community in Kansas, including the Kansas Department of Transportation : (KDOT), is required to obtain appropriate permits for construction projects. Projects that involve stream : modification, including drainage structures...

  17. 75 FR 48628 - Approval and Promulgation of Implementation Plans; State of Nebraska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... compounds; clarify language and incorporate rules related to construction permits to incorporate application... clarify language related to open fires and explicitly include an exemption for fires used for religious...

  18. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  19. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  20. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchsbaum, L.

    Phoenix Coal currently operates 3 surface coal mines in Western Kentucky and have recently obtained the permits to construct their first underground mine. The expansion of the Phoenix Coal company since its formation in July 2004 is described. 4 photos.

  2. United States housing, 2012

    Treesearch

    Delton Alderman

    2013-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing completions for single and multifamily units, and sales and construction. This report will be updated annually.

  3. 24 CFR 3285.307 - Perimeter support piers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... support piers. (a) Piers required at mate-line supports, perimeter piers, and piers at exterior wall openings are permitted to be constructed of single open-cell or closed-cell concrete blocks, with nominal...

  4. Determination of Stability and Control Derivatives using Computational Fluid Dynamics and Automatic Differentiation

    NASA Technical Reports Server (NTRS)

    Park, Michael A.; Green, Lawrence L.; Montgomery, Raymond C.; Raney, David L.

    1999-01-01

    With the recent interest in novel control effectors there is a need to determine the stability and control derivatives of new aircraft configurations early in the design process. These derivatives are central to most control law design methods and would allow the determination of closed-loop control performance of the vehicle. Early determination of the static and dynamic behavior of an aircraft may permit significant improvement in configuration weight, cost, stealth, and performance through multidisciplinary design. The classical method of determining static stability and control derivatives - constructing and testing wind tunnel models - is expensive and requires a long lead time for the resultant data. Wind tunnel tests are also limited to the preselected control effectors of the model. To overcome these shortcomings, computational fluid dynamics (CFD) solvers are augmented via automatic differentiation, to directly calculate the stability and control derivatives. The CFD forces and moments are differentiated with respect to angle of attack, angle of sideslip, and aircraft shape parameters to form these derivatives. A subset of static stability and control derivatives of a tailless aircraft concept have been computed by two differentiated inviscid CFD codes and verified for accuracy with central finite-difference approximations and favorable comparisons to a simulation database.

  5. 40 CFR 49.134 - Rule for forestry and silvicultural burning permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... burning permits. 49.134 Section 49.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS... and silvicultural burning permits. (a) What is the purpose of this section? This section establishes a permitting program for forestry and silvicultural burning within the Indian reservation to control emissions...

  6. Interferograms, schlieren, and shadowgraphs constructed from real- and ideal-gas, two- and three-dimensional computed flowfields

    NASA Technical Reports Server (NTRS)

    Yates, Leslie A.

    1993-01-01

    The construction of interferograms, schlieren, and shadowgraphs from computed flowfield solutions permits one-to-one comparisons of computed and experimental results. A method of constructing these images from both ideal- and real-gas, two and three-dimensional computed flowfields is described. The computational grids can be structured or unstructured, and multiple grids are an option. Constructed images are shown for several types of computed flows including nozzle, wake, and reacting flows; comparisons to experimental images are also shown. In addition, th sensitivity of these images to errors in the flowfield solution is demonstrated, and the constructed images can be used to identify problem areas in the computations.

  7. Interferograms, Schlieren, and Shadowgraphs Constructed from Real- and Ideal-Gas, Two- and Three-Dimensional Computed Flowfields

    NASA Technical Reports Server (NTRS)

    Yates, Leslie A.

    1992-01-01

    The construction of interferograms, schlieren, and shadowgraphs from computed flowfield solutions permits one-to-one comparisons of computed and experimental results. A method for constructing these images from both ideal- and real-gas, two- and three-dimensional computed flowfields is described. The computational grids can be structured or unstructured, and multiple grids are an option. Constructed images are shown for several types of computed flows including nozzle, wake, and reacting flows; comparisons to experimental images are also shown. In addition, the sensitivity of these images to errors in the flowfield solution is demonstrated, and the constructed images can be used to identify problem areas in the computations.

  8. 21 CFR 1210.26 - Permits for raw milk or cream.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permits for raw milk or cream. 1210.26 Section... FEDERAL IMPORT MILK ACT Permit Control § 1210.26 Permits for raw milk or cream. Except as provided in § 1210.27, permits to ship or transport raw milk or cream into the United States will be granted only...

  9. 21 CFR 1210.26 - Permits for raw milk or cream.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits for raw milk or cream. 1210.26 Section... FEDERAL IMPORT MILK ACT Permit Control § 1210.26 Permits for raw milk or cream. Except as provided in § 1210.27, permits to ship or transport raw milk or cream into the United States will be granted only...

  10. PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halverson, N; Ralph Nichols, R; Topher Berry, T

    2007-10-22

    A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximummore » limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.« less

  11. 77 FR 72851 - California State Nonroad Engine Pollution Control Standards; Portable Equipment Registration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9758-1] California State Nonroad Engine Pollution Control... throughout California without obtaining permits from local air pollution control districts. DATES: Petitions... faced the need to obtain preconstruction and operating permits from different local air pollution...

  12. Eukaryotic initiation factor 3 (eIF3) and 5’ mRNA leader sequences as agents of translational regulation in Arabidopsis. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    von Arnim, Albrecht G.

    2015-02-04

    Protein synthesis, or translation, consumes a sizable fraction of the cell’s energy budget, estimated at 5% and up to 50% in differentiated and growing cells, respectively. Plants also invest significant energy and biomass to construct and maintain the translation apparatus. Translation is regulated by a variety of external stimuli. Compared to transcriptional control, attributes of translational control include reduced sensitivity to stochastic fluctuation, a finer gauge of control, and more rapid responsiveness to environmental stimuli. Yet, our murky understanding of translational control allows few generalizations. Consequently, translational regulation is underutilized in the context of transgene regulation, although synthetic biologists aremore » now beginning to appropriate RNA-level gene regulation into their regulatory circuits. We also know little about how translational control contributes to the diversity of plant form and function. This project explored how an emerging regulatory mRNA sequence element, upstream open reading frames (uORFs), is integrated with the general translation initiation machinery to permit translational regulation on specific mRNAs.« less

  13. 40 CFR 49.132 - Rule for general open burning permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Rule for general open burning permits... open burning permits. (a) What is the purpose of this section? This section establishes a permitting program for open burning within the Indian reservation to control emissions of particulate matter and...

  14. 40 CFR 144.41 - Minor modifications of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Minor modifications of permits. 144.41... (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.41 Minor modifications of... part 124. Any permit modification not processed as a minor modification under this section must be made...

  15. 21 CFR 1210.20 - Application for permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.20 Application for permit. Application for a permit to ship or transport milk or cream into the United States shall be made by the actual shipper upon forms...

  16. 21 CFR 1210.20 - Application for permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.20 Application for permit. Application for a permit to ship or transport milk or cream into the United States shall be made by the actual shipper upon forms...

  17. 40 CFR 49.133 - Rule for agricultural burning permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Rule for agricultural burning permits... agricultural burning permits. (a) What is the purpose of this section? This section establishes a permitting program for agricultural burning within the Indian reservation to control emissions of particulate matter...

  18. 40 CFR 49.133 - Rule for agricultural burning permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Rule for agricultural burning permits... agricultural burning permits. (a) What is the purpose of this section? This section establishes a permitting program for agricultural burning within the Indian reservation to control emissions of particulate matter...

  19. 40 CFR 49.132 - Rule for general open burning permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Rule for general open burning permits... open burning permits. (a) What is the purpose of this section? This section establishes a permitting program for open burning within the Indian reservation to control emissions of particulate matter and...

  20. 40 CFR 49.132 - Rule for general open burning permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Rule for general open burning permits... open burning permits. (a) What is the purpose of this section? This section establishes a permitting program for open burning within the Indian reservation to control emissions of particulate matter and...

Top