Sample records for control maqc project

  1. The MicroArray Quality Control (MAQC)-II study of common practices for the development and validation of microarray-based predictive models

    EPA Science Inventory

    The second phase of the MicroArray Quality Control (MAQC-II) project evaluated common practices for developing and validating microarray-based models aimed at predicting toxicological and clinical endpoints. Thirty-six teams developed classifiers for 13 endpoints - some easy, som...

  2. The MicroArray Quality Control (MAQC) project shows inter- and intraplatform reproducibility of gene expression measurements

    PubMed Central

    2012-01-01

    Over the last decade, the introduction of microarray technology has had a profound impact on gene expression research. The publication of studies with dissimilar or altogether contradictory results, obtained using different microarray platforms to analyze identical RNA samples, has raised concerns about the reliability of this technology. The MicroArray Quality Control (MAQC) project was initiated to address these concerns, as well as other performance and data analysis issues. Expression data on four titration pools from two distinct reference RNA samples were generated at multiple test sites using a variety of microarray-based and alternative technology platforms. Here we describe the experimental design and probe mapping efforts behind the MAQC project. We show intraplatform consistency across test sites as well as a high level of interplatform concordance in terms of genes identified as differentially expressed. This study provides a resource that represents an important first step toward establishing a framework for the use of microarrays in clinical and regulatory settings. PMID:16964229

  3. The FDA's Experience with Emerging Genomics Technologies-Past, Present, and Future.

    PubMed

    Xu, Joshua; Thakkar, Shraddha; Gong, Binsheng; Tong, Weida

    2016-07-01

    The rapid advancement of emerging genomics technologies and their application for assessing safety and efficacy of FDA-regulated products require a high standard of reliability and robustness supporting regulatory decision-making in the FDA. To facilitate the regulatory application, the FDA implemented a novel data submission program, Voluntary Genomics Data Submission (VGDS), and also to engage the stakeholders. As part of the endeavor, for the past 10 years, the FDA has led an international consortium of regulatory agencies, academia, pharmaceutical companies, and genomics platform providers, which was named MicroArray Quality Control Consortium (MAQC), to address issues such as reproducibility, precision, specificity/sensitivity, and data interpretation. Three projects have been completed so far assessing these genomics technologies: gene expression microarrays, whole genome genotyping arrays, and whole transcriptome sequencing (i.e., RNA-seq). The resultant studies provide the basic parameters for fit-for-purpose application of these new data streams in regulatory environments, and the solutions have been made available to the public through peer-reviewed publications. The latest MAQC project is also called the SEquencing Quality Control (SEQC) project focused on next-generation sequencing. Using reference samples with built-in controls, SEQC studies have demonstrated that relative gene expression can be measured accurately and reliably across laboratories and RNA-seq platforms. Besides prediction performance comparable to microarrays in clinical settings and safety assessments, RNA-seq is shown to have better sensitivity for low expression and reveal novel transcriptomic features. Future effort of MAQC will be focused on quality control of whole genome sequencing and targeted sequencing.

  4. The FDA’s Experience with Emerging Genomics Technologies—Past, Present, and Future

    PubMed Central

    Xu, Joshua; Thakkar, Shraddha; Gong, Binsheng; Tong, Weida

    2016-01-01

    The rapid advancement of emerging genomics technologies and their application for assessing safety and efficacy of FDA-regulated products require a high standard of reliability and robustness supporting regulatory decision-making in the FDA. To facilitate the regulatory application, the FDA implemented a novel data submission program, Voluntary Genomics Data Submission (VGDS), and also to engage the stakeholders. As part of the endeavor, for the past 10 years, the FDA has led an international consortium of regulatory agencies, academia, pharmaceutical companies, and genomics platform providers, which was named MicroArray Quality Control Consortium (MAQC), to address issues such as reproducibility, precision, specificity/sensitivity, and data interpretation. Three projects have been completed so far assessing these genomics technologies: gene expression microarrays, whole genome genotyping arrays, and whole transcriptome sequencing (i.e., RNA-seq). The resultant studies provide the basic parameters for fit-for-purpose application of these new data streams in regulatory environments, and the solutions have been made available to the public through peer-reviewed publications. The latest MAQC project is also called the SEquencing Quality Control (SEQC) project focused on next-generation sequencing. Using reference samples with built-in controls, SEQC studies have demonstrated that relative gene expression can be measured accurately and reliably across laboratories and RNA-seq platforms. Besides prediction performance comparable to microarrays in clinical settings and safety assessments, RNA-seq is shown to have better sensitivity for low expression and reveal novel transcriptomic features. Future effort of MAQC will be focused on quality control of whole genome sequencing and targeted sequencing. PMID:27116022

  5. THE MAQC PROJECT: ESTABLISHING QC METRICS AND THRESHOLDS FOR MICROARRAY QUALITY CONTROL

    EPA Science Inventory

    Microarrays represent a core technology in pharmacogenomics and toxicogenomics; however, before this technology can successfully and reliably be applied in clinical practice and regulatory decision-making, standards and quality measures need to be developed. The Microarray Qualit...

  6. THE MAQC (MICROARRAY QUALITY CONTROL) PROJECT: CALIBRATED RNA SAMPLES, REFERENCE DATASETS, AND QC METRICS AND THRESHOLDS

    EPA Science Inventory

    FDAs Critical Path Initiative identifies pharmacogenomics and toxicogenomics as key opportunities in advancing medical product development and personalized medicine, and the Guidance for Industry: Pharmacogenomic Data Submissions has been released. Microarrays represent a co...

  7. The MicroArray Quality Control (MAQC) project shows inter- and intraplatform reproducibility of gene expression measurements

    EPA Science Inventory

    Over the last decade, the introduction of microarray technology has had a profound impact on gene expression research. The publication of studies with dissimilar or altogether contradictory results, obtained using different microarray platforms to analyze identical RNA samples, ...

  8. A comparison of per sample global scaling and per gene normalization methods for differential expression analysis of RNA-seq data.

    PubMed

    Li, Xiaohong; Brock, Guy N; Rouchka, Eric C; Cooper, Nigel G F; Wu, Dongfeng; O'Toole, Timothy E; Gill, Ryan S; Eteleeb, Abdallah M; O'Brien, Liz; Rai, Shesh N

    2017-01-01

    Normalization is an essential step with considerable impact on high-throughput RNA sequencing (RNA-seq) data analysis. Although there are numerous methods for read count normalization, it remains a challenge to choose an optimal method due to multiple factors contributing to read count variability that affects the overall sensitivity and specificity. In order to properly determine the most appropriate normalization methods, it is critical to compare the performance and shortcomings of a representative set of normalization routines based on different dataset characteristics. Therefore, we set out to evaluate the performance of the commonly used methods (DESeq, TMM-edgeR, FPKM-CuffDiff, TC, Med UQ and FQ) and two new methods we propose: Med-pgQ2 and UQ-pgQ2 (per-gene normalization after per-sample median or upper-quartile global scaling). Our per-gene normalization approach allows for comparisons between conditions based on similar count levels. Using the benchmark Microarray Quality Control Project (MAQC) and simulated datasets, we performed differential gene expression analysis to evaluate these methods. When evaluating MAQC2 with two replicates, we observed that Med-pgQ2 and UQ-pgQ2 achieved a slightly higher area under the Receiver Operating Characteristic Curve (AUC), a specificity rate > 85%, the detection power > 92% and an actual false discovery rate (FDR) under 0.06 given the nominal FDR (≤0.05). Although the top commonly used methods (DESeq and TMM-edgeR) yield a higher power (>93%) for MAQC2 data, they trade off with a reduced specificity (<70%) and a slightly higher actual FDR than our proposed methods. In addition, the results from an analysis based on the qualitative characteristics of sample distribution for MAQC2 and human breast cancer datasets show that only our gene-wise normalization methods corrected data skewed towards lower read counts. However, when we evaluated MAQC3 with less variation in five replicates, all methods performed similarly. Thus, our proposed Med-pgQ2 and UQ-pgQ2 methods perform slightly better for differential gene analysis of RNA-seq data skewed towards lowly expressed read counts with high variation by improving specificity while maintaining a good detection power with a control of the nominal FDR level.

  9. A comparison of per sample global scaling and per gene normalization methods for differential expression analysis of RNA-seq data

    PubMed Central

    Li, Xiaohong; Brock, Guy N.; Rouchka, Eric C.; Cooper, Nigel G. F.; Wu, Dongfeng; O’Toole, Timothy E.; Gill, Ryan S.; Eteleeb, Abdallah M.; O’Brien, Liz

    2017-01-01

    Normalization is an essential step with considerable impact on high-throughput RNA sequencing (RNA-seq) data analysis. Although there are numerous methods for read count normalization, it remains a challenge to choose an optimal method due to multiple factors contributing to read count variability that affects the overall sensitivity and specificity. In order to properly determine the most appropriate normalization methods, it is critical to compare the performance and shortcomings of a representative set of normalization routines based on different dataset characteristics. Therefore, we set out to evaluate the performance of the commonly used methods (DESeq, TMM-edgeR, FPKM-CuffDiff, TC, Med UQ and FQ) and two new methods we propose: Med-pgQ2 and UQ-pgQ2 (per-gene normalization after per-sample median or upper-quartile global scaling). Our per-gene normalization approach allows for comparisons between conditions based on similar count levels. Using the benchmark Microarray Quality Control Project (MAQC) and simulated datasets, we performed differential gene expression analysis to evaluate these methods. When evaluating MAQC2 with two replicates, we observed that Med-pgQ2 and UQ-pgQ2 achieved a slightly higher area under the Receiver Operating Characteristic Curve (AUC), a specificity rate > 85%, the detection power > 92% and an actual false discovery rate (FDR) under 0.06 given the nominal FDR (≤0.05). Although the top commonly used methods (DESeq and TMM-edgeR) yield a higher power (>93%) for MAQC2 data, they trade off with a reduced specificity (<70%) and a slightly higher actual FDR than our proposed methods. In addition, the results from an analysis based on the qualitative characteristics of sample distribution for MAQC2 and human breast cancer datasets show that only our gene-wise normalization methods corrected data skewed towards lower read counts. However, when we evaluated MAQC3 with less variation in five replicates, all methods performed similarly. Thus, our proposed Med-pgQ2 and UQ-pgQ2 methods perform slightly better for differential gene analysis of RNA-seq data skewed towards lowly expressed read counts with high variation by improving specificity while maintaining a good detection power with a control of the nominal FDR level. PMID:28459823

  10. Performance comparison of two microarray platforms to assess differential gene expression in human monocyte and macrophage cells

    PubMed Central

    Maouche, Seraya; Poirier, Odette; Godefroy, Tiphaine; Olaso, Robert; Gut, Ivo; Collet, Jean-Phillipe; Montalescot, Gilles; Cambien, François

    2008-01-01

    Background In this study we assessed the respective ability of Affymetrix and Illumina microarray methodologies to answer a relevant biological question, namely the change in gene expression between resting monocytes and macrophages derived from these monocytes. Five RNA samples for each type of cell were hybridized to the two platforms in parallel. In addition, a reference list of differentially expressed genes (DEG) was generated from a larger number of hybridizations (mRNA from 86 individuals) using the RNG/MRC two-color platform. Results Our results show an important overlap of the Illumina and Affymetrix DEG lists. In addition, more than 70% of the genes in these lists were also present in the reference list. Overall the two platforms had very similar performance in terms of biological significance, evaluated by the presence in the DEG lists of an excess of genes belonging to Gene Ontology (GO) categories relevant for the biology of monocytes and macrophages. Our results support the conclusion of the MicroArray Quality Control (MAQC) project that the criteria used to constitute the DEG lists strongly influence the degree of concordance among platforms. However the importance of prioritizing genes by magnitude of effect (fold change) rather than statistical significance (p-value) to enhance cross-platform reproducibility recommended by the MAQC authors was not supported by our data. Conclusion Functional analysis based on GO enrichment demonstrates that the 2 compared technologies delivered very similar results and identified most of the relevant GO categories enriched in the reference list. PMID:18578872

  11. Mixture models reveal multiple positional bias types in RNA-Seq data and lead to accurate transcript concentration estimates.

    PubMed

    Tuerk, Andreas; Wiktorin, Gregor; Güler, Serhat

    2017-05-01

    Accuracy of transcript quantification with RNA-Seq is negatively affected by positional fragment bias. This article introduces Mix2 (rd. "mixquare"), a transcript quantification method which uses a mixture of probability distributions to model and thereby neutralize the effects of positional fragment bias. The parameters of Mix2 are trained by Expectation Maximization resulting in simultaneous transcript abundance and bias estimates. We compare Mix2 to Cufflinks, RSEM, eXpress and PennSeq; state-of-the-art quantification methods implementing some form of bias correction. On four synthetic biases we show that the accuracy of Mix2 overall exceeds the accuracy of the other methods and that its bias estimates converge to the correct solution. We further evaluate Mix2 on real RNA-Seq data from the Microarray and Sequencing Quality Control (MAQC, SEQC) Consortia. On MAQC data, Mix2 achieves improved correlation to qPCR measurements with a relative increase in R2 between 4% and 50%. Mix2 also yields repeatable concentration estimates across technical replicates with a relative increase in R2 between 8% and 47% and reduced standard deviation across the full concentration range. We further observe more accurate detection of differential expression with a relative increase in true positives between 74% and 378% for 5% false positives. In addition, Mix2 reveals 5 dominant biases in MAQC data deviating from the common assumption of a uniform fragment distribution. On SEQC data, Mix2 yields higher consistency between measured and predicted concentration ratios. A relative error of 20% or less is obtained for 51% of transcripts by Mix2, 40% of transcripts by Cufflinks and RSEM and 30% by eXpress. Titration order consistency is correct for 47% of transcripts for Mix2, 41% for Cufflinks and RSEM and 34% for eXpress. We, further, observe improved repeatability across laboratory sites with a relative increase in R2 between 8% and 44% and reduced standard deviation.

  12. Supervised Variational Relevance Learning, An Analytic Geometric Feature Selection with Applications to Omic Datasets.

    PubMed

    Boareto, Marcelo; Cesar, Jonatas; Leite, Vitor B P; Caticha, Nestor

    2015-01-01

    We introduce Supervised Variational Relevance Learning (Suvrel), a variational method to determine metric tensors to define distance based similarity in pattern classification, inspired in relevance learning. The variational method is applied to a cost function that penalizes large intraclass distances and favors small interclass distances. We find analytically the metric tensor that minimizes the cost function. Preprocessing the patterns by doing linear transformations using the metric tensor yields a dataset which can be more efficiently classified. We test our methods using publicly available datasets, for some standard classifiers. Among these datasets, two were tested by the MAQC-II project and, even without the use of further preprocessing, our results improve on their performance.

  13. Determination of Minimum Training Sample Size for Microarray-Based Cancer Outcome Prediction–An Empirical Assessment

    PubMed Central

    Cheng, Ningtao; Wu, Leihong; Cheng, Yiyu

    2013-01-01

    The promise of microarray technology in providing prediction classifiers for cancer outcome estimation has been confirmed by a number of demonstrable successes. However, the reliability of prediction results relies heavily on the accuracy of statistical parameters involved in classifiers. It cannot be reliably estimated with only a small number of training samples. Therefore, it is of vital importance to determine the minimum number of training samples and to ensure the clinical value of microarrays in cancer outcome prediction. We evaluated the impact of training sample size on model performance extensively based on 3 large-scale cancer microarray datasets provided by the second phase of MicroArray Quality Control project (MAQC-II). An SSNR-based (scale of signal-to-noise ratio) protocol was proposed in this study for minimum training sample size determination. External validation results based on another 3 cancer datasets confirmed that the SSNR-based approach could not only determine the minimum number of training samples efficiently, but also provide a valuable strategy for estimating the underlying performance of classifiers in advance. Once translated into clinical routine applications, the SSNR-based protocol would provide great convenience in microarray-based cancer outcome prediction in improving classifier reliability. PMID:23861920

  14. Intra-Platform Repeatability and Inter-Platform Comparability of MicroRNA Microarray Technology

    PubMed Central

    Sato, Fumiaki; Tsuchiya, Soken; Terasawa, Kazuya; Tsujimoto, Gozoh

    2009-01-01

    Over the last decade, DNA microarray technology has provided a great contribution to the life sciences. The MicroArray Quality Control (MAQC) project demonstrated the way to analyze the expression microarray. Recently, microarray technology has been utilized to analyze a comprehensive microRNA expression profiling. Currently, several platforms of microRNA microarray chips are commercially available. Thus, we compared repeatability and comparability of five different microRNA microarray platforms (Agilent, Ambion, Exiqon, Invitrogen and Toray) using 309 microRNAs probes, and the Taqman microRNA system using 142 microRNA probes. This study demonstrated that microRNA microarray has high intra-platform repeatability and comparability to quantitative RT-PCR of microRNA. Among the five platforms, Agilent and Toray array showed relatively better performances than the others. However, the current lineup of commercially available microRNA microarray systems fails to show good inter-platform concordance, probably because of lack of an adequate normalization method and severe divergence in stringency of detection call criteria between different platforms. This study provided the basic information about the performance and the problems specific to the current microRNA microarray systems. PMID:19436744

  15. Comparing the normalization methods for the differential analysis of Illumina high-throughput RNA-Seq data.

    PubMed

    Li, Peipei; Piao, Yongjun; Shon, Ho Sun; Ryu, Keun Ho

    2015-10-28

    Recently, rapid improvements in technology and decrease in sequencing costs have made RNA-Seq a widely used technique to quantify gene expression levels. Various normalization approaches have been proposed, owing to the importance of normalization in the analysis of RNA-Seq data. A comparison of recently proposed normalization methods is required to generate suitable guidelines for the selection of the most appropriate approach for future experiments. In this paper, we compared eight non-abundance (RC, UQ, Med, TMM, DESeq, Q, RPKM, and ERPKM) and two abundance estimation normalization methods (RSEM and Sailfish). The experiments were based on real Illumina high-throughput RNA-Seq of 35- and 76-nucleotide sequences produced in the MAQC project and simulation reads. Reads were mapped with human genome obtained from UCSC Genome Browser Database. For precise evaluation, we investigated Spearman correlation between the normalization results from RNA-Seq and MAQC qRT-PCR values for 996 genes. Based on this work, we showed that out of the eight non-abundance estimation normalization methods, RC, UQ, Med, TMM, DESeq, and Q gave similar normalization results for all data sets. For RNA-Seq of a 35-nucleotide sequence, RPKM showed the highest correlation results, but for RNA-Seq of a 76-nucleotide sequence, least correlation was observed than the other methods. ERPKM did not improve results than RPKM. Between two abundance estimation normalization methods, for RNA-Seq of a 35-nucleotide sequence, higher correlation was obtained with Sailfish than that with RSEM, which was better than without using abundance estimation methods. However, for RNA-Seq of a 76-nucleotide sequence, the results achieved by RSEM were similar to without applying abundance estimation methods, and were much better than with Sailfish. Furthermore, we found that adding a poly-A tail increased alignment numbers, but did not improve normalization results. Spearman correlation analysis revealed that RC, UQ, Med, TMM, DESeq, and Q did not noticeably improve gene expression normalization, regardless of read length. Other normalization methods were more efficient when alignment accuracy was low; Sailfish with RPKM gave the best normalization results. When alignment accuracy was high, RC was sufficient for gene expression calculation. And we suggest ignoring poly-A tail during differential gene expression analysis.

  16. In silico Pathway Activation Network Decomposition Analysis (iPANDA) as a method for biomarker development.

    PubMed

    Ozerov, Ivan V; Lezhnina, Ksenia V; Izumchenko, Evgeny; Artemov, Artem V; Medintsev, Sergey; Vanhaelen, Quentin; Aliper, Alexander; Vijg, Jan; Osipov, Andreyan N; Labat, Ivan; West, Michael D; Buzdin, Anton; Cantor, Charles R; Nikolsky, Yuri; Borisov, Nikolay; Irincheeva, Irina; Khokhlovich, Edward; Sidransky, David; Camargo, Miguel Luiz; Zhavoronkov, Alex

    2016-11-16

    Signalling pathway activation analysis is a powerful approach for extracting biologically relevant features from large-scale transcriptomic and proteomic data. However, modern pathway-based methods often fail to provide stable pathway signatures of a specific phenotype or reliable disease biomarkers. In the present study, we introduce the in silico Pathway Activation Network Decomposition Analysis (iPANDA) as a scalable robust method for biomarker identification using gene expression data. The iPANDA method combines precalculated gene coexpression data with gene importance factors based on the degree of differential gene expression and pathway topology decomposition for obtaining pathway activation scores. Using Microarray Analysis Quality Control (MAQC) data sets and pretreatment data on Taxol-based neoadjuvant breast cancer therapy from multiple sources, we demonstrate that iPANDA provides significant noise reduction in transcriptomic data and identifies highly robust sets of biologically relevant pathway signatures. We successfully apply iPANDA for stratifying breast cancer patients according to their sensitivity to neoadjuvant therapy.

  17. In silico Pathway Activation Network Decomposition Analysis (iPANDA) as a method for biomarker development

    PubMed Central

    Ozerov, Ivan V.; Lezhnina, Ksenia V.; Izumchenko, Evgeny; Artemov, Artem V.; Medintsev, Sergey; Vanhaelen, Quentin; Aliper, Alexander; Vijg, Jan; Osipov, Andreyan N.; Labat, Ivan; West, Michael D.; Buzdin, Anton; Cantor, Charles R.; Nikolsky, Yuri; Borisov, Nikolay; Irincheeva, Irina; Khokhlovich, Edward; Sidransky, David; Camargo, Miguel Luiz; Zhavoronkov, Alex

    2016-01-01

    Signalling pathway activation analysis is a powerful approach for extracting biologically relevant features from large-scale transcriptomic and proteomic data. However, modern pathway-based methods often fail to provide stable pathway signatures of a specific phenotype or reliable disease biomarkers. In the present study, we introduce the in silico Pathway Activation Network Decomposition Analysis (iPANDA) as a scalable robust method for biomarker identification using gene expression data. The iPANDA method combines precalculated gene coexpression data with gene importance factors based on the degree of differential gene expression and pathway topology decomposition for obtaining pathway activation scores. Using Microarray Analysis Quality Control (MAQC) data sets and pretreatment data on Taxol-based neoadjuvant breast cancer therapy from multiple sources, we demonstrate that iPANDA provides significant noise reduction in transcriptomic data and identifies highly robust sets of biologically relevant pathway signatures. We successfully apply iPANDA for stratifying breast cancer patients according to their sensitivity to neoadjuvant therapy. PMID:27848968

  18. Power enhancement via multivariate outlier testing with gene expression arrays.

    PubMed

    Asare, Adam L; Gao, Zhong; Carey, Vincent J; Wang, Richard; Seyfert-Margolis, Vicki

    2009-01-01

    As the use of microarrays in human studies continues to increase, stringent quality assurance is necessary to ensure accurate experimental interpretation. We present a formal approach for microarray quality assessment that is based on dimension reduction of established measures of signal and noise components of expression followed by parametric multivariate outlier testing. We applied our approach to several data resources. First, as a negative control, we found that the Affymetrix and Illumina contributions to MAQC data were free from outliers at a nominal outlier flagging rate of alpha=0.01. Second, we created a tunable framework for artificially corrupting intensity data from the Affymetrix Latin Square spike-in experiment to allow investigation of sensitivity and specificity of quality assurance (QA) criteria. Third, we applied the procedure to 507 Affymetrix microarray GeneChips processed with RNA from human peripheral blood samples. We show that exclusion of arrays by this approach substantially increases inferential power, or the ability to detect differential expression, in large clinical studies. http://bioconductor.org/packages/2.3/bioc/html/arrayMvout.html and http://bioconductor.org/packages/2.3/bioc/html/affyContam.html affyContam (credentials: readonly/readonly)

  19. Evaluation of sequencing approaches for high-throughput ...

    EPA Pesticide Factsheets

    Whole-genome in vitro transcriptomics has shown the capability to identify mechanisms of action and estimates of potency for chemical-mediated effects in a toxicological framework, but with limited throughput and high cost. We present the evaluation of three toxicogenomics platforms for potential application to high-throughput screening: 1. TempO-Seq utilizing custom designed paired probes per gene; 2. Targeted sequencing (TSQ) utilizing Illumina’s TruSeq RNA Access Library Prep Kit containing tiled exon-specific probe sets; 3. Low coverage whole transcriptome sequencing (LSQ) using Illumina’s TruSeq Stranded mRNA Kit. Each platform was required to cover the ~20,000 genes of the full transcriptome, operate directly with cell lysates, and be automatable with 384-well plates. Technical reproducibility was assessed using MAQC control RNA samples A and B, while functional utility for chemical screening was evaluated using six treatments at a single concentration after 6 hr in MCF7 breast cancer cells: 10 µM chlorpromazine, 10 µM ciclopriox, 10 µM genistein, 100 nM sirolimus, 1 µM tanespimycin, and 1 µM trichostatin A. All RNA samples and chemical treatments were run with 5 technical replicates. The three platforms achieved different read depths, with the TempO-Seq having ~34M mapped reads per sample, while TSQ and LSQ averaged 20M and 11M aligned reads per sample, respectively. Inter-replicate correlation averaged ≥0.95 for raw log2 expression values i

  20. Comprehensive RNA-Seq transcriptomic profiling across 11 organs, 4 ages, and 2 sexes of Fischer 344 rats.

    PubMed

    Yu, Ying; Zhao, Chen; Su, Zhenqiang; Wang, Charles; Fuscoe, James C; Tong, Weida; Shi, Leming

    2014-01-01

    The rat is used extensively by the pharmaceutical, regulatory, and academic communities for safety assessment of drugs and chemicals and for studying human diseases; however, its transcriptome has not been well studied. As part of the SEQC (i.e., MAQC-III) consortium efforts, a comprehensive RNA-Seq data set was constructed using 320 RNA samples isolated from 10 organs (adrenal gland, brain, heart, kidney, liver, lung, muscle, spleen, thymus, and testes or uterus) from both sexes of Fischer 344 rats across four ages (2-, 6-, 21-, and 104-week-old) with four biological replicates for each of the 80 sample groups (organ-sex-age). With the Ribo-Zero rRNA removal and Illumina RNA-Seq protocols, 41 million 50 bp single-end reads were generated per sample, yielding a total of 13.4 billion reads. This data set could be used to identify and validate new rat genes and transcripts, develop a more comprehensive rat transcriptome annotation system, identify novel gene regulatory networks related to tissue specific gene expression and development, and discover genes responsible for disease and drug toxicity and efficacy.

  1. Toxicogenomics: the challenges and opportunities to identify biomarkers, signatures and thresholds to support mode-of-action.

    PubMed

    Currie, Richard A

    2012-08-15

    Toxicogenomics (TGx) can be defined as the application of "omics" techniques to toxicology and risk assessment. By identifying molecular changes associated with toxicity, TGx data might assist hazard identification and investigate causes. Early technical challenges were evaluated and addressed by consortia (e.g. ISLI/HESI and the Microarray Quality Control consortium), which demonstrated that TGx gave reliable and reproducible information. The MAQC also produced "best practice on signature generation" after conducting an extensive evaluation of different methods on common datasets. Two findings of note were the need for methods that control batch variability, and that the predictive ability of a signature changes in concert with the variability of the endpoint. The key challenge remaining is data interpretation, because TGx can identify molecular changes that are causal, associated with or incidental to toxicity. Application of Bradford Hill's tests for causation, which are used to build mode of action (MOA) arguments, can produce reasonable hypotheses linking altered pathways to phenotypic changes. However, challenges in interpretation still remain: are all pathway changes equal, which are most important and plausibly linked to toxicity? Therefore the expert judgement of the toxicologist is still needed. There are theoretical reasons why consistent alterations across a metabolic pathway are important, but similar changes in signalling pathways may not alter information flow. At the molecular level thresholds may be due to the inherent properties of the regulatory network, for example switch-like behaviours from some network motifs (e.g. positive feedback) in the perturbed pathway leading to the toxicity. The application of systems biology methods to TGx data can generate hypotheses that explain why a threshold response exists. However, are we adequately trained to make these judgments? There is a need for collaborative efforts between regulators, industry and academia to properly define how these technologies can be applied using appropriate case-studies. Copyright © 2012 Elsevier B.V. All rights reserved.

  2. Evaluation of gene expression classification studies: factors associated with classification performance.

    PubMed

    Novianti, Putri W; Roes, Kit C B; Eijkemans, Marinus J C

    2014-01-01

    Classification methods used in microarray studies for gene expression are diverse in the way they deal with the underlying complexity of the data, as well as in the technique used to build the classification model. The MAQC II study on cancer classification problems has found that performance was affected by factors such as the classification algorithm, cross validation method, number of genes, and gene selection method. In this paper, we study the hypothesis that the disease under study significantly determines which method is optimal, and that additionally sample size, class imbalance, type of medical question (diagnostic, prognostic or treatment response), and microarray platform are potentially influential. A systematic literature review was used to extract the information from 48 published articles on non-cancer microarray classification studies. The impact of the various factors on the reported classification accuracy was analyzed through random-intercept logistic regression. The type of medical question and method of cross validation dominated the explained variation in accuracy among studies, followed by disease category and microarray platform. In total, 42% of the between study variation was explained by all the study specific and problem specific factors that we studied together.

  3. Sequence-specific bias correction for RNA-seq data using recurrent neural networks.

    PubMed

    Zhang, Yao-Zhong; Yamaguchi, Rui; Imoto, Seiya; Miyano, Satoru

    2017-01-25

    The recent success of deep learning techniques in machine learning and artificial intelligence has stimulated a great deal of interest among bioinformaticians, who now wish to bring the power of deep learning to bare on a host of bioinformatical problems. Deep learning is ideally suited for biological problems that require automatic or hierarchical feature representation for biological data when prior knowledge is limited. In this work, we address the sequence-specific bias correction problem for RNA-seq data redusing Recurrent Neural Networks (RNNs) to model nucleotide sequences without pre-determining sequence structures. The sequence-specific bias of a read is then calculated based on the sequence probabilities estimated by RNNs, and used in the estimation of gene abundance. We explore the application of two popular RNN recurrent units for this task and demonstrate that RNN-based approaches provide a flexible way to model nucleotide sequences without knowledge of predetermined sequence structures. Our experiments show that training a RNN-based nucleotide sequence model is efficient and RNN-based bias correction methods compare well with the-state-of-the-art sequence-specific bias correction method on the commonly used MAQC-III data set. RNNs provides an alternative and flexible way to calculate sequence-specific bias without explicitly pre-determining sequence structures.

  4. Comparison of RNA-seq and microarray-based models for clinical endpoint prediction.

    PubMed

    Zhang, Wenqian; Yu, Ying; Hertwig, Falk; Thierry-Mieg, Jean; Zhang, Wenwei; Thierry-Mieg, Danielle; Wang, Jian; Furlanello, Cesare; Devanarayan, Viswanath; Cheng, Jie; Deng, Youping; Hero, Barbara; Hong, Huixiao; Jia, Meiwen; Li, Li; Lin, Simon M; Nikolsky, Yuri; Oberthuer, André; Qing, Tao; Su, Zhenqiang; Volland, Ruth; Wang, Charles; Wang, May D; Ai, Junmei; Albanese, Davide; Asgharzadeh, Shahab; Avigad, Smadar; Bao, Wenjun; Bessarabova, Marina; Brilliant, Murray H; Brors, Benedikt; Chierici, Marco; Chu, Tzu-Ming; Zhang, Jibin; Grundy, Richard G; He, Min Max; Hebbring, Scott; Kaufman, Howard L; Lababidi, Samir; Lancashire, Lee J; Li, Yan; Lu, Xin X; Luo, Heng; Ma, Xiwen; Ning, Baitang; Noguera, Rosa; Peifer, Martin; Phan, John H; Roels, Frederik; Rosswog, Carolina; Shao, Susan; Shen, Jie; Theissen, Jessica; Tonini, Gian Paolo; Vandesompele, Jo; Wu, Po-Yen; Xiao, Wenzhong; Xu, Joshua; Xu, Weihong; Xuan, Jiekun; Yang, Yong; Ye, Zhan; Dong, Zirui; Zhang, Ke K; Yin, Ye; Zhao, Chen; Zheng, Yuanting; Wolfinger, Russell D; Shi, Tieliu; Malkas, Linda H; Berthold, Frank; Wang, Jun; Tong, Weida; Shi, Leming; Peng, Zhiyu; Fischer, Matthias

    2015-06-25

    Gene expression profiling is being widely applied in cancer research to identify biomarkers for clinical endpoint prediction. Since RNA-seq provides a powerful tool for transcriptome-based applications beyond the limitations of microarrays, we sought to systematically evaluate the performance of RNA-seq-based and microarray-based classifiers in this MAQC-III/SEQC study for clinical endpoint prediction using neuroblastoma as a model. We generate gene expression profiles from 498 primary neuroblastomas using both RNA-seq and 44 k microarrays. Characterization of the neuroblastoma transcriptome by RNA-seq reveals that more than 48,000 genes and 200,000 transcripts are being expressed in this malignancy. We also find that RNA-seq provides much more detailed information on specific transcript expression patterns in clinico-genetic neuroblastoma subgroups than microarrays. To systematically compare the power of RNA-seq and microarray-based models in predicting clinical endpoints, we divide the cohort randomly into training and validation sets and develop 360 predictive models on six clinical endpoints of varying predictability. Evaluation of factors potentially affecting model performances reveals that prediction accuracies are most strongly influenced by the nature of the clinical endpoint, whereas technological platforms (RNA-seq vs. microarrays), RNA-seq data analysis pipelines, and feature levels (gene vs. transcript vs. exon-junction level) do not significantly affect performances of the models. We demonstrate that RNA-seq outperforms microarrays in determining the transcriptomic characteristics of cancer, while RNA-seq and microarray-based models perform similarly in clinical endpoint prediction. Our findings may be valuable to guide future studies on the development of gene expression-based predictive models and their implementation in clinical practice.

  5. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  6. Dynamic association rules for gene expression data analysis.

    PubMed

    Chen, Shu-Chuan; Tsai, Tsung-Hsien; Chung, Cheng-Han; Li, Wen-Hsiung

    2015-10-14

    The purpose of gene expression analysis is to look for the association between regulation of gene expression levels and phenotypic variations. This association based on gene expression profile has been used to determine whether the induction/repression of genes correspond to phenotypic variations including cell regulations, clinical diagnoses and drug development. Statistical analyses on microarray data have been developed to resolve gene selection issue. However, these methods do not inform us of causality between genes and phenotypes. In this paper, we propose the dynamic association rule algorithm (DAR algorithm) which helps ones to efficiently select a subset of significant genes for subsequent analysis. The DAR algorithm is based on association rules from market basket analysis in marketing. We first propose a statistical way, based on constructing a one-sided confidence interval and hypothesis testing, to determine if an association rule is meaningful. Based on the proposed statistical method, we then developed the DAR algorithm for gene expression data analysis. The method was applied to analyze four microarray datasets and one Next Generation Sequencing (NGS) dataset: the Mice Apo A1 dataset, the whole genome expression dataset of mouse embryonic stem cells, expression profiling of the bone marrow of Leukemia patients, Microarray Quality Control (MAQC) data set and the RNA-seq dataset of a mouse genomic imprinting study. A comparison of the proposed method with the t-test on the expression profiling of the bone marrow of Leukemia patients was conducted. We developed a statistical way, based on the concept of confidence interval, to determine the minimum support and minimum confidence for mining association relationships among items. With the minimum support and minimum confidence, one can find significant rules in one single step. The DAR algorithm was then developed for gene expression data analysis. Four gene expression datasets showed that the proposed DAR algorithm not only was able to identify a set of differentially expressed genes that largely agreed with that of other methods, but also provided an efficient and accurate way to find influential genes of a disease. In the paper, the well-established association rule mining technique from marketing has been successfully modified to determine the minimum support and minimum confidence based on the concept of confidence interval and hypothesis testing. It can be applied to gene expression data to mine significant association rules between gene regulation and phenotype. The proposed DAR algorithm provides an efficient way to find influential genes that underlie the phenotypic variance.

  7. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  8. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  9. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  10. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  11. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  12. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  13. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  14. Principles and Practices for Quality Assurance and Quality Control

    USGS Publications Warehouse

    Jones, Berwyn E.

    1999-01-01

    Quality assurance and quality control are vital parts of highway runoff water-quality monitoring projects. To be effective, project quality assurance must address all aspects of the project, including project management responsibilities and resources, data quality objectives, sampling and analysis plans, data-collection protocols, data quality-control plans, data-assessment procedures and requirements, and project outputs. Quality control ensures that the data quality objectives are achieved as planned. The historical development and current state of the art of quality assurance and quality control concepts described in this report can be applied to evaluation of data from prior projects.

  15. An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment

    NASA Astrophysics Data System (ADS)

    Zengmei, L.; Guanghua, Q.; Zishen, C.

    2015-05-01

    The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the category, quantity and spatial distribution of the disaster-bearing bodies are also changed more or less. Therefore, under the changing environment, the direct benefit of a waterlogging control project should be the reduction of waterlogging losses compared to conditions with no control project. Moreover, the waterlogging losses with or without the project should be the mathematical expectations of the waterlogging losses when rainstorms of all frequencies meet various water levels in the drainage-accepting zone. So an estimation model of the direct benefit of waterlogging control is proposed. Firstly, on the basis of a Copula function, the joint distribution of the rainstorms and the water levels are established, so as to obtain their joint probability density function. Secondly, according to the two-dimensional joint probability density distribution, the dimensional domain of integration is determined, which is then divided into small domains so as to calculate the probability for each of the small domains and the difference between the average waterlogging loss with and without a waterlogging control project, called the regional benefit of waterlogging control project, under the condition that rainstorms in the waterlogging-prone zone meet the water level in the drainage-accepting zone. Finally, it calculates the weighted mean of the project benefit of all small domains, with probability as the weight, and gets the benefit of the waterlogging control project. Taking the estimation of benefit of a waterlogging control project in Yangshan County, Guangdong Province, as an example, the paper briefly explains the procedures in waterlogging control project benefit estimation. The results show that the waterlogging control benefit estimation model constructed is applicable to the changing conditions that occur in both the disaster-inducing environment of the waterlogging-prone zone and disaster-bearing bodies, considering all conditions when rainstorms of all frequencies meet different water levels in the drainage-accepting zone. Thus, the estimation method of waterlogging control benefit can reflect the actual situation more objectively, and offer a scientific basis for rational decision-making for waterlogging control projects.

  16. An ex ante control chart for project monitoring using earned duration management observations

    NASA Astrophysics Data System (ADS)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  17. Guidance and Control Software Project Data - Volume 1: Planning Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  18. [Effect of water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in rivers connecting with Yangtze River in Pukou District, Nanjing City].

    PubMed

    Qiang, Zhou; Li-Xin, Wan; De-Rong, Hang; Qi-Hui, You; Jun, You; Yu-Lin, Zhang; Zhao-Feng, Zhu; Yi-Xin, Huang

    2017-12-07

    To evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control Oncomelania hupensis snails in the rivers connecting with the Yangtze River. The water conservancy schistosomiasis control projects of Zhujiashan River, Qili River and Gaowang River were chosen as the study objects in Pukou District, Nanjing City. The data review method and field investigation were used to evaluate the effect of the water conservancy schistosomiasis control projects combined with molluscicide to control O. hupensis snails. After the projects of the water level control and concrete slope protection and mollusciciding were implemented, the snails in the project river sections were completely eliminated. The snail diffusion did not happen in the inland irrigation area too. In the outside of the river beach, though the snails still existed, the snail densities plunged below 1.0 snail per 1.0 m 2 . The comprehensive measures of the combination of water level control, concrete slope protection and mollusciciding can effectively control and eliminate the snails, and prevent the snails from spreading.

  19. Infection control in design and construction work.

    PubMed

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  20. Supporting the Future Air Traffic Control Projection Process

    NASA Technical Reports Server (NTRS)

    Davison, Hayley J.; Hansman, R. John, Jr.

    2002-01-01

    In air traffic control, projecting what the air traffic situation will be over the next 30 seconds to 30 minutes is a key process in identifying conflicts that may arise so that evasive action can be taken upon discovery of these conflicts. A series of field visits in the Boston and New York terminal radar approach control (TRACON) facilities and in the oceanic air traffic control facilities in New York and Reykjavik, Iceland were conducted to investigate the projection process in two different ATC domains. The results from the site visits suggest that two types of projection are currently used in ATC tasks, depending on the type of separation minima and/or traffic restriction and information display used by the controller. As technologies improve and procedures change, care should be taken by designers to support projection through displays, automation, and procedures. It is critical to prevent time/space mismatches between interfaces and restrictions. Existing structure in traffic dynamics could be utilized to provide controllers with useful behavioral models on which to build projections. Subtle structure that the controllers are unable to internalize could be incorporated into an ATC projection aid.

  1. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  2. Allocation of control rights in the PPP Project: a cooperative game model

    NASA Astrophysics Data System (ADS)

    Zhang, Yunhua; Feng, Jingchun; Yang, Shengtao

    2017-06-01

    Reasonable allocation of control rights is the key to the success of Public-Private Partnership (PPP) projects. PPP are services or ventures which are financed and operated through cooperation between governmental and private sector actors and which involve reasonable control rights sharing between these two partners. After professional firm with capital and technology as a shareholder participating in PPP project firms, the PPP project is diversified in participants and input resources. Meanwhile the allocation of control rights of PPP project tends to be complicated. According to the diversification of participants and input resources of PPP projects, the key participants are divided into professional firms and pure investors. Based on the cost of repurchase of different input resources in markets, the cooperative game relationship between these two parties is analyzed, on the basis of which the allocation model of the cooperative game for control rights is constructed to ensure optimum allocation ration of control rights and verify the share of control rights in proportion to the cost of repurchase.

  3. Achievements and challenges of the World Bank Loan/Department for International Development grant-assisted Tuberculosis Control Project in China.

    PubMed

    Kong, Peng; Jiang, Xu; Zhang, Ben; Jiang, Shi-wen; Liu, Bo

    2011-07-01

    In March 2002, the government of China launched the World Bank Loan/ Department for International Development-supported Tuberculosis (TB) Control Project to reduce the prevalence and mortality of TB. The project generated promising results in policy development, strengthening of TB control systems, patient treatment success, funds management, and the introduction of legislation. In light of the global TB epidemic and control environment, it is useful to review the TB control priorities of the project, summarize the achievements and experiences around its implementation.

  4. An overview of the active flexible wing program

    NASA Technical Reports Server (NTRS)

    Cole, Stanley R.; Perry, Boyd, III; Miller, Gerald D.

    1991-01-01

    An outline of the Active Flexible Wing (AFW) project that was meant to serve as an introduction to an entire session of the Computational Control Workshop is presented. Following background information on the project is a description of the AFW wind tunnel model and results from the initial wind tunnel test of the AFW model under the current project. Emphasis is on major project accomplishments. The AFW project is an effort to demonstrate aeroelastic control through the application of digital controls technology. Active flutter suppression and active control of maneuver loads during high speed rolling maneuvers are examined.

  5. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    ERIC Educational Resources Information Center

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  6. Control of invasive rats on islands and priorities for future action.

    PubMed

    Duron, Quiterie; Shiels, Aaron B; Vidal, Eric

    2017-08-01

    Invasive rats are one of the world's most successful animal groups that cause native species extinctions and ecosystem change, particularly on islands. On large islands, rat eradication is often impossible and population control, defined as the local limitation of rat abundance, is now routinely performed on many of the world's islands as an alternative management tool. However, a synthesis of the motivations, techniques, costs, and outcomes of such rat-control projects is lacking. We reviewed the literature, searched relevant websites, and conducted a survey via a questionnaire to synthesize the available information on rat-control projects in island natural areas worldwide to improve rat management and native species conservation. Data were collected from 136 projects conducted over the last 40 years; most were located in Australasia (46%) and the tropical Pacific (25%) in forest ecosystems (65%) and coastal strands (22%). Most of the projects targeted Rattus rattus and most (82%) were aimed at protecting birds and endangered ecosystems. Poisoning (35%) and a combination of trapping and poisoning (42%) were the most common methods. Poisoning allows for treatment of larger areas, and poison projects generally last longer than trapping projects. Second-generation anticoagulants (mainly brodifacoum and bromadiolone) were used most often. The median annual cost for rat-control projects was US$17,262 or US$227/ha. Median project duration was 4 years. For 58% of the projects, rat population reduction was reported, and 51% of projects showed evidence of positive effects on biodiversity. Our data were from few countries, revealing the need to expand rat-control distribution especially in some biodiversity hotspots. Improvement in control methods is needed as is regular monitoring to assess short- and long-term effectiveness of rat-control. © 2016 Society for Conservation Biology.

  7. Guidance and Control Software Project Data - Volume 3: Verification Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  8. Controls on project proponents and environmental impact assessment effectiveness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ortolano, L.

    The degree of effectiveness of environmental impact assessment (EIA) for particular projects is associated with the existence of mechanisms of organizational control. Five dimensions of EIA effectiveness are considered: procedural compliance, completeness of EIA documents, methods to assess impacts, influence on project decisions, and weight given to environmental factors. Six mechanisms of control are introduced and illustrated by programs and projects in several countries. Experience in the Philippines under President Marcos demonstrates that procedural control in the form of EIA regulations, when used without other control mechanisms, will lead at most to token compliance. Judicial control, as practiced in themore » US, yields high procedural compliance. Evaluative control can yield effective EIA, but some systems based on this form of control treat only a small fraction of the major projects proposed. Both control exerted by development assistance organizations and control by professionals have great potential for yielding effective EIA, but that potential has not been fully realized. Control exerted directly by citizens or agencies not otherwise involved in EIA is uncommon, but cases from Taiwan demonstrate that those controls can be significant. An understanding of relationships between control mechanisms and EIA effectiveness is useful in designing EIA policies and programs.« less

  9. Controlled Ecological Life Support System Breadboard Project - 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  10. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  11. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  12. 23 CFR 655.605 - Project procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project procedures. 655.605 Section 655.605 Highways... OPERATIONS Traffic Control Devices on Federal-Aid and Other Streets and Highways § 655.605 Project procedures. (a) Federal-aid highways. Federal-aid projects involving the installation of traffic control devices...

  13. 23 CFR 655.605 - Project procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project procedures. 655.605 Section 655.605 Highways... OPERATIONS Traffic Control Devices on Federal-Aid and Other Streets and Highways § 655.605 Project procedures. (a) Federal-aid highways. Federal-aid projects involving the installation of traffic control devices...

  14. 23 CFR 655.605 - Project procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project procedures. 655.605 Section 655.605 Highways... OPERATIONS Traffic Control Devices on Federal-Aid and Other Streets and Highways § 655.605 Project procedures. (a) Federal-aid highways. Federal-aid projects involving the installation of traffic control devices...

  15. 23 CFR 655.605 - Project procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project procedures. 655.605 Section 655.605 Highways... OPERATIONS Traffic Control Devices on Federal-Aid and Other Streets and Highways § 655.605 Project procedures. (a) Federal-aid highways. Federal-aid projects involving the installation of traffic control devices...

  16. 23 CFR 655.605 - Project procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project procedures. 655.605 Section 655.605 Highways... OPERATIONS Traffic Control Devices on Federal-Aid and Other Streets and Highways § 655.605 Project procedures. (a) Federal-aid highways. Federal-aid projects involving the installation of traffic control devices...

  17. Microgrid Controls | Grid Modernization | NREL

    Science.gov Websites

    Systems Integration Facility. Microgrid Controller Interaction with Distribution Management Systems This project investigates the interaction of distribution management systems with local controllers, including microgrid controllers. The project is developing integrated control and management systems for distribution

  18. Application of Standard Project Management Tools to Research--A Case Study from a Multi-National Clinical Trial

    ERIC Educational Resources Information Center

    Gist, Peter; Langley, David

    2007-01-01

    PRINCE2, which stands for Projects in Controlled Environments, is a project management method covering the organisation, management, and control of projects and is widely used in both government and commercial IT and building projects in the UK. This paper describes the application of PRINCE2 to the management of large clinical trials…

  19. Administrative Leadership as Projection, Social Control, and Action.

    ERIC Educational Resources Information Center

    Reed, Donald B.

    Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…

  20. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project Management Plan and shall describe the procedures to be used to ensure compliance with technical and policy requirements during implementation. (b) During development of the Project Management Plan for each project, the...

  1. 33 CFR 274.6 - Division/district pest control programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.6 Division... from time to time, will be used as guides in selecting the type of chemicals and the method of application in the control of vegetation and pests at civil works projects. (b) Responsibilities and reports...

  2. Guidance and Control Software Project Data - Volume 2: Development Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  3. A Manual of Mosquito Control Projects and Committee Assignments for 4-H and Scouts Biology Class Projects, Organized Community Service Programs, and Individuals Interested in Environmental Management.

    ERIC Educational Resources Information Center

    Hart, Richard A.

    The mosquito control projects presented in this manual were prepared from an educational viewpoint and are intended for use by students in 4-H and Scouts and as a supplement to high school and college biology course work. The major emphasis of the projects is on integrated pest management, an approach utilizing cost-effective control methods which…

  4. Road Construction Safety Audit for Interstate Reconstruction. Volume 2.

    DOT National Transportation Integrated Search

    1998-10-01

    Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were...

  5. Road Construction Safety Audit for Interstate Reconstruction. Volume 1.

    DOT National Transportation Integrated Search

    1998-10-01

    Traffic control alternatives associated with reconstruction projects on a rural interstate have been investigated in this research. Slab replacement projects, milling/resurfacing projects, and traffic controls in the vicinity of interstate ramps were...

  6. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  7. Control Strategy Tool (CoST)

    EPA Pesticide Factsheets

    The EPA Control Strategy Tool (CoST) is a software tool for projecting potential future control scenarios, their effects on emissions and estimated costs. This tool uses the NEI and the Control Measures Dataset as key inputs. CoST outputs are projections of future control scenarios.

  8. Modeling of Control Costs, Emissions, and Control Retrofits for Cost Effectiveness and Feasibility Analyses

    EPA Pesticide Factsheets

    Learn about EPA’s use of the Integrated Planning Model (IPM) to develop estimates of SO2 and NOx emission control costs, projections of futureemissions, and projections of capacity of future control retrofits, assuming controls on EGUs.

  9. Northeastern Oregon bark beetle control project 1910-11.

    Treesearch

    H.E. Burke

    1990-01-01

    This history, from the memoirs of the entomologist in charge, describes the first large-scale cooperative bark beetle control project funded by Congress in the Western United States. It describes relations between the Forest Service, Bureau of Entomology, and private timber owners, how the project was organized and conducted, and results of the control measures. The...

  10. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Enforceability of design concept and scope and project-level mitigation and control measures. 93.125 Section 93.125 Protection of Environment...

  11. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Enforceability of design concept and scope and project-level mitigation and control measures. 93.125 Section 93.125 Protection of Environment...

  12. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Enforceability of design concept and scope and project-level mitigation and control measures. 93.125 Section 93.125 Protection of Environment...

  13. The control panel for the joint NASA/Gulfstream Quiet Spike project, located in the backseat of NASA's F-15B testbed aircraft

    NASA Image and Video Library

    2006-08-16

    The control panel for the joint NASA/Gulfstream Quiet Spike project, located in the backseat of NASA's F-15B testbed aircraft. The project seeks to verify the structural integrity of the multi-segmented, articulating spike attachment designed to reduce and control a sonic boom.

  14. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and scope and project-level mitigation and control measures. 93.125 Section 93.125 Protection of Environment...

  15. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Enforceability of design concept and scope and project-level mitigation and control measures. 93.125 Section 93.125 Protection of Environment...

  16. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

  17. Project Design Concept for Monitoring and Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCGREW, D.L.

    2000-10-02

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations.

  18. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  19. The United States Department Of Agriculture Northeast Area-wide Tick Control Project: history and protocol.

    PubMed

    Pound, Joe Mathews; Miller, John Allen; George, John E; Fish, Durland

    2009-08-01

    The Northeast Area-wide Tick Control Project (NEATCP) was funded by the United States Department of Agriculture (USDA) as a large-scale cooperative demonstration project of the USDA-Agricultural Research Service (ARS)-patented 4-Poster tick control technology (Pound et al. 1994) involving the USDA-ARS and a consortium of universities, state agencies, and a consulting firm at research locations in the five states of Connecticut (CT), Maryland (MD), New Jersey (NJ), New York (NY), and Rhode Island (RI). The stated objective of the project was "A community-based field trial of ARS-patented tick control technology designed to reduce the risk of Lyme disease in northeastern states." Here we relate the rationale and history of the technology, a chronological listing of events leading to implementation of the project, the original protocol for selecting treatment, and control sites, and protocols for deployment of treatments, sampling, assays, data analyses, and estimates of efficacy.

  20. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  1. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  2. 31 CFR 515.575 - Humanitarian projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY CUBAN ASSETS CONTROL REGULATIONS Licenses... Cuba not otherwise covered by this part that are designed to directly benefit the Cuban people. Such... intended to benefit legitimately independent civil society groups; environmental projects; projects...

  3. 31 CFR 515.575 - Humanitarian projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY CUBAN ASSETS CONTROL REGULATIONS Licenses... Cuba not otherwise covered by this part that are designed to directly benefit the Cuban people. Such... intended to benefit legitimately independent civil society groups; environmental projects; projects...

  4. 31 CFR 515.575 - Humanitarian projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY CUBAN ASSETS CONTROL REGULATIONS Licenses... Cuba not otherwise covered by this part that are designed to directly benefit the Cuban people. Such... intended to benefit legitimately independent civil society groups; environmental projects; projects...

  5. 31 CFR 515.575 - Humanitarian projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY CUBAN ASSETS CONTROL REGULATIONS Licenses... Cuba not otherwise covered by this part that are designed to directly benefit the Cuban people. Such... intended to benefit legitimately independent civil society groups; environmental projects; projects...

  6. Response of loblolly pine to complete woody and herbaceous control: projected yields and economic outcomes - the COMProject

    Treesearch

    James H. Miller; R.L. Busby; B.R. Zutter; S.M. Zedaker; M.B. Edwards; R.A. Newbold

    1995-01-01

    Abstract.Age-8 and -9 data from the 13 study plantations of the Competition Omission Monitoring Project (COMP) were used to project yields and derive economic outcomes for loblolly pine (Pinus taeda L.). COMP treatments were chop-burn, complete woody plant control, complete herbaceous plant control for 4 years, and complete woody...

  7. Financial auditing at enterprises for control of projects realized with credit fund-raising

    NASA Astrophysics Data System (ADS)

    Lukmanova, Inessa

    2017-10-01

    The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.

  8. A multi-site evaluation of innovative approaches to increase tuberculosis case notification: summary results.

    PubMed

    Creswell, Jacob; Sahu, Suvanand; Blok, Lucie; Bakker, Mirjam I; Stevens, Robert; Ditiu, Lucica

    2014-01-01

    Globally, TB notifications have stagnated since 2007, and sputum smear positive notifications have been declining despite policies to improve case detection. We evaluate results of 28 interventions focused on improving TB case detection. We measured additional sputum smear positive cases treated, defined as the intervention area's increase in case notification during the project compared to the previous year. Projects were encouraged to select control areas and collect historical notification data. We used time series negative binomial regression for over-dispersed cross-sectional data accounting for fixed and random effects to test the individual projects' effects on TB notification while controlling for trend and control populations. Twenty-eight projects, 19 with control populations, completed at least four quarters of case finding activities, covering a population of 89.2 million. Among all projects sputum smear positive (SS+) TB notifications increased 24.9% and annualized notification rates increased from 69.1 to 86.2/100,000 (p = 0.0209) during interventions. Among the 19 projects with control populations, SS+TB case notifications increased 36.9% increase while in the control populations a 3.6% decrease was observed. Fourteen (74%) of the 19 projects' SS+TB notification rates in intervention areas increased from the baseline to intervention period when controlling for historical trends and notifications in control areas. Interventions were associated with large increases in TB notifications across many settings, using an array of interventions. Many people with TB are not reached using current approaches. Different methods and interventions tailored to local realities are urgently needed.

  9. NASA Project Planning and Control Handbook

    NASA Technical Reports Server (NTRS)

    Moreland, Robert; Claunch, Cathy L.

    2016-01-01

    This handbook provides an overview of the fundamental principles and explains the functions and products that go into project planning and control. The 2010 Interim Results of the NASA Program Planning and Control (PPC) Study identified seven categories of activities for PPC, and those provide the basis for the seven functions described in this handbook. This handbook maps out the interfaces and interactions between PPC functions, as well as their external interfaces. This integration of information and products within and between functions is necessary to form the whole picture of how a project is progressing. The handbook descriptions are meant to facilitate consistent, common, and comprehensive approaches for providing valued analysis, assessment, and evaluation focused on the project level at NASA. The handbook also describes activities in terms of function rather than the job title or the specific person or organization responsible for the activity, which could differ by Center or size of a project. This handbook is primarily guidance for project planning and control: however, the same principles apply to programs and generally apply to institutional planning and control.

  10. Success in large high-technology projects: What really works?

    NASA Astrophysics Data System (ADS)

    Crosby, P.

    2014-08-01

    Despite a plethora of tools, technologies and management systems, successful execution of big science and engineering projects remains problematic. The sheer scale of globally funded projects such as the Large Hadron Collider and the Square Kilometre Array telescope means that lack of project success can impact both on national budgets, and collaborative reputations. In this paper, I explore data from contemporary literature alongside field research from several current high-technology projects in Europe and Australia, and reveal common `pressure points' that are shown to be key influencers of project control and success. I discuss the how mega-science projects sit between being merely complicated, and chaotic, and explain the importance of understanding multiple dimensions of project complexity. Project manager/leader traits are briefly discussed, including capability to govern and control such enterprises. Project structures are examined, including the challenge of collaborations. I show that early attention to building project resilience, curbing optimism, and risk alertness can help prepare large high-tech projects against threats, and why project managers need to understand aspects of `the silent power of time'. Mission assurance is advanced as a critical success function, alongside the deployment of task forces and new combinations of contingency plans. I argue for increased project control through industrial-style project reviews, and show how post-project reviews are an under-used, yet invaluable avenue of personal and organisational improvement. Lastly, I discuss the avoidance of project amnesia through effective capture of project knowledge, and transfer of lessons-learned to subsequent programs and projects.

  11. Towards canine rabies elimination: Economic comparisons of three project sites.

    PubMed

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  12. Substrate comprising a nanometer-scale projection array

    DOEpatents

    Cui, Yi; Zhu, Jia; Hsu, Ching-Mei; Connor, Stephen T; Yu, Zongfu; Fan, Shanhui; Burkhard, George

    2012-11-27

    A method for forming a substrate comprising nanometer-scale pillars or cones that project from the surface of the substrate is disclosed. The method enables control over physical characteristics of the projections including diameter, sidewall angle, and tip shape. The method further enables control over the arrangement of the projections including characteristics such as center-to-center spacing and separation distance.

  13. 31 CFR 500.576 - Authorization of transactions concerning certain development projects in Vietnam.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FOREIGN ASSETS CONTROL REGULATIONS Licenses, Authorizations and Statements of Licensing Policy... section, Qualified Projects include investment projects, structural adjustment lending, sector adjustment...

  14. [Effect of water storage and aquaculture on Oncomelania hupensis control in tidal flats wetlands of islet-beach type area of Dantu section of lower reaches of Yangtze River].

    PubMed

    Li, Ye-fang; Huang, Yi-xin; Wang, He-sheng; Hang, De-rong; Chen, Xiang-ping; Xie, Yi-feng; Zhang, Lian-heng

    2015-12-01

    To evaluate the effect and the benefits of the projects of water storage and aquaculture on Oncomelania hupensis snail control in the tidal flats wetlands of islet-beach type area of lower reaches of the Yangtze River. The projects of water storage and aquaculture on 0. hupensis snail control were implemented in the tidal flats wetlands of islet-beach type of lower reaches of the Yangtze River. The breed situation of the snails was investigated by the conventional method before and after the project implementation and the effect of control and elimination of the snails by the projects were evaluated. At the same time, the cost-benefit analysis of two projects among them was performed by the static benefit-cost ratio method. All of 0. hupensis snails were eliminated in the first year after the implementation of seven water storage and aquaculture projects. The costs of detection and control of snails saved by each project was 69.20 thousand yuan a year on average. The annual net benefits of the "Nanhao Group 10 beach" project and "Wutao Group 6-14 beach" project were 2 039.40 thousand yuan and 955.00 thousand yuan respectively, and the annual net benefit-cost ratios were 1.09: 1 and 1.07: 1 respectively. The O. hupensis snails could be rapidly eliminated by the water storage and aquaculture, and the economic benefit is obvious, but the wetland ecological protection and flood control safety should be considered in the tidal flats wetlands of islet-beach type area of lower reaches of the Yangtze River.

  15. Multirate Flutter Suppression System Design for the Benchmark Active Controls Technology Wing. Part 1; Theory and Design Procedure

    NASA Technical Reports Server (NTRS)

    Mason, Gregory S.; Berg, Martin C.; Mukhopadhyay, Vivek

    2002-01-01

    To study the effectiveness of various control system design methodologies, the NASA Langley Research Center initiated the Benchmark Active Controls Project. In this project, the various methodologies were applied to design a flutter suppression system for the Benchmark Active Controls Technology (BACT) Wing. This report describes a project at the University of Washington to design a multirate suppression system for the BACT wing. The objective of the project was two fold. First, to develop a methodology for designing robust multirate compensators, and second, to demonstrate the methodology by applying it to the design of a multirate flutter suppression system for the BACT wing.

  16. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    EPA Science Inventory

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  17. MINE WASTE TECHNOLOGY PROGRAM - UNDERGROUND MINE SOURCE CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    This report presents results of the Mine Waste Technology Program Activity III, Project 8, Underground Mine Source Control Demonstration Project implemented and funded by the U. S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U. S. Department of E...

  18. 77 FR 11109 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...-Native Plant Control Project, Proposes a Forest-Wide Integrated Management Strategy to Control the Spread..., Final EIS, USFS, SD, Steamboat Project, Proposes to Implement Multiple Resource Management Actions... EIS, USFS, WA, South George Vegetation and Fuels Management Project, To Improve Forest Health and...

  19. Acquisition and production of skilled behavior in dynamic decision-making tasks

    NASA Technical Reports Server (NTRS)

    Kirlik, Alex

    1993-01-01

    Summaries of the four projects completed during the performance of this research are included. The four projects described are: Perceptual Augmentation Aiding for Situation Assessment, Perceptual Augmentation Aiding for Dynamic Decision-Making and Control, Action Advisory Aiding for Dynamic Decision-Making and Control, and Display Design to Support Time-Constrained Route Optimization. Papers based on each of these projects are currently in preparation. The theoretical framework upon which the first three projects are based, Ecological Task Analysis, was also developed during the performance of this research, and is described in a previous report. A project concerned with modeling strategies in human control of a dynamic system was also completed during the performance of this research.

  20. Cost-effectiveness of the Health X Project for tuberculosis control in China.

    PubMed

    Wang, W-B; Zhang, H; Petzold, M; Zhao, Q; Xu, B; Zhao, G-M

    2014-08-01

    Between 2002 and 2008, China's National Tuberculosis Control Programme created the Health X Project, financed in part by a World Bank loan, with additional funding from the UK Department for International Development. To assess the cost-effectiveness of the Project and its impact from a financial point of view on tuberculosis (TB) control in China. A decision-analytic model was used to evaluate the cost-effectiveness of the Project. Sensitivity analysis was used to assess the impact of different scenarios and assumptions on results. The primary outcome of the study was cost per disability-adjusted life-year (DALY) saved and incremental DALYs saved. In comparison with alternative scenario 1, the Project detected 1.6 million additional cases, 44 000 deaths were prevented and a total of 18.4 million DALYs saved. The Project strategies cost approximately Chinese yuan (CNY) 953 per DALY saved (vs. CNY1140 in the control areas), and saved an estimated CNY17.5 billion in comparison with the unchanged alternative scenario (scenario 1) or CNY10.8 billion with the control scenario (scenario 2). The Project strategies were affordable and of comparable cost-effectiveness to those of other developing countries. The results also provide strong support for the existing policy of scaling up DOTS in China.

  1. 33 CFR 274.6 - Division/district pest control programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Division/district pest control..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.6 Division/district pest control programs. (a) Guides. Referenced technical manuals, and Engineer Circulars issued...

  2. 33 CFR 274.6 - Division/district pest control programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Division/district pest control..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.6 Division/district pest control programs. (a) Guides. Referenced technical manuals, and Engineer Circulars issued...

  3. 33 CFR 274.6 - Division/district pest control programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Division/district pest control..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.6 Division/district pest control programs. (a) Guides. Referenced technical manuals, and Engineer Circulars issued...

  4. 33 CFR 274.6 - Division/district pest control programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Division/district pest control..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.6 Division/district pest control programs. (a) Guides. Referenced technical manuals, and Engineer Circulars issued...

  5. Research on the optimization of quota design in real estate

    NASA Astrophysics Data System (ADS)

    Sun, Chunling; Ma, Susu; Zhong, Weichao

    2017-11-01

    Quota design is one of the effective methods of cost control in real estate development project and widely used in the current real estate development project to control the engineering construction cost, but quota design have many deficiencies in design process. For this purpose, this paper put forward a method to achieve investment control of real estate development project, which combine quota design and value engineering(VE) at the stage of design. Specifically, it’s an optimizing for the structure of quota design. At first, determine the design limits by investment estimate value, then using VE to carry on initial allocation of design limits and gain the functional target cost, finally, consider the whole life cycle cost (LCC) and operational problem in practical application to finish complex correction for the functional target cost. The improved process can control the project cost more effectively. It not only can control investment in a certain range, but also make the project realize maximum value within investment.

  6. Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Carlson, Stephen

    This Commercial and Industrial Lighting Controls Evaluation Protocol (the protocol) describes methods to account for energy savings resulting from programmatic installation of lighting control equipment in large populations of commercial, industrial, government, institutional, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. When lighting controls are installed in conjunction with a lighting retrofit project, the lighting control savings must be calculated parametrically with the lighting retrofit project so savings are not double counted.

  7. Watchdog Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Campbell, Jack; Hadley, Mark

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to havemore » strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control system owners have very little choice on how to protect communications on the local network. The Watchdog project reduces security risks in electric sector control system local area networks (LANs) by providing: Network access control (NAC) Multi-Layer firewall (physical through transport layer) Containment of malware or unauthorized traffic spreading across the network White list protocols and application message types filtering Configurable, proactive traffic engineering The Watchdog project achieved all of the above by developing an SDN switch.« less

  8. Aerospace Vehicle Design, Spacecraft Section. Volume 3

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Research results are presented for the following groups: Project Mars Airplane Vehicle and Reconnaissance Instrument Carrier (MAVRIC), ACME, ARES, Project ACRONYM, Mars Aircraft Recepticle with Technical Instruments, Aerobraking, and Navigation (MARTIAN), and NOMADS. Each project is described by the following areas of focus: mission planning and costs; aerobraking systems; structures and thermal control systems; attitude and articulation control systems; comman and data control systems; science instrumentation; and power and propulsion systems.

  9. Recent Results from NASA's Morphing Project

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria R.; Washburn, Anthony E.; Horta, Lucas G.; Bryant, Robert G.; Cox, David E.; Siochi, Emilie J.; Padula, Sharon L.; Holloway, Nancy M.

    2002-01-01

    The NASA Morphing Project seeks to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include macro, micro, structural and/or fluidic approaches. The project includes research on smart materials, adaptive structures, micro flow control, biomimetic concepts, optimization and controls. This paper presents an updated overview of the content of the Morphing Project including highlights of recent research results.

  10. Projection Operator: A Step Towards Certification of Adaptive Controllers

    NASA Technical Reports Server (NTRS)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  11. 77 FR 30292 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial Review The meeting...)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and...

  12. 76 FR 28437 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial Review The meeting...), the Centers for Disease Control and Prevention (CDC) announces the aforementioned meeting: Time and...

  13. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Rent control. 850.153 Section 850... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or substantially rehabilitated with a housing development grant is not subject to State or local rent control...

  14. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Rent control. 850.153 Section 850... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or substantially rehabilitated with a housing development grant is not subject to State or local rent control...

  15. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Rent control. 850.153 Section 850... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or substantially rehabilitated with a housing development grant is not subject to State or local rent control...

  16. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project... Corps of Engineers and the non-Federal sponsor shall establish a Technical Review Team to conduct.... The members of the Technical Review Team shall be independent of the Project Delivery Team and the...

  17. A Framework for Categorizing Important Project Variables

    NASA Technical Reports Server (NTRS)

    Parsons, Vickie S.

    2003-01-01

    While substantial research has led to theories concerning the variables that affect project success, no universal set of such variables has been acknowledged as the standard. The identification of a specific set of controllable variables is needed to minimize project failure. Much has been hypothesized about the need to match project controls and management processes to individual projects in order to increase the chance for success. However, an accepted taxonomy for facilitating this matching process does not exist. This paper surveyed existing literature on classification of project variables. After an analysis of those proposals, a simplified categorization is offered to encourage further research.

  18. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    NASA Technical Reports Server (NTRS)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  19. [Effect evaluation of water conservancy project with ditches managed against Oncomelania hupensis in Yunnan Province].

    PubMed

    Ning-Bo, Huang; Peng, Huang; Zong-Ti, Shao; Xi-Guang, Feng; Yi, Dong; Guang-Huai, Yang; Jin-Song, Li; Yan-Hong, Zhang; Shao-Yun, Chen; Shou-Ju, Nie; Wen, Li

    2016-03-11

    To evaluate the effect of hydraulic schistosomiasis control project with ditches managed on Oncomelania hupensis snail control. From 2009 to 2011, the snail investigations and schistosomiasis surveillance were carried out in Dali City and Yongsheng County, two sites of national schistosomiasis surveillance. The history data of schistosomiasis control were collected and analyzed. At the harden sections of the water conservancy project with ditches managed in Shajing Village of Dali City, only one snail was found in 2010 with the density of living snails of 0.004 snails/0.1 m 2 , while the densities of living snails were respectively 0.080, 0.002 snails/0.1 m 2 and 0.007 snails/0.1 m2 in unhardened sections of the project from 2009 to 2011. No snails were found in the harden sections of the water conservancy project with ditches managed in Gaojiacun Village of Yongsheng County, while the densities of living snails were respectively 0.040, 0.030 snails/0.1 m2 and 0.040 snails/0.1 m2 in unhardened sections of the project from 2009 to 2011. After the ditches were hardened, no infected snails were found from 2009 to 2011, and the appearance rate of frames with snails and density of living snails were both decreased, while they were both higher in unhardened ditches. The hydraulic schistosomiasis control project has obvious effect on control snails, but the maintain work should be strengthened after the project is completed.

  20. Use of Structure as a Basis for Abstraction in Air Traffic Control

    NASA Technical Reports Server (NTRS)

    Davison, Hayley J.; Hansman, R. John

    2004-01-01

    The safety and efficiency of the air traffic control domain is highly dependent on the capabilities and limitations of its human controllers. Past research has indicated that structure provided by the airspace and procedures could aid in simplifying the controllers cognitive tasks. In this paper, observations, interviews, voice command data analyses, and radar analyses were conducted at the Boston Terminal Route Control (TRACON) facility to determine if there was evidence of controllers using structure to simplify their cognitive processes. The data suggest that controllers do use structure-based abstractions to simplify their cognitive processes, particularly the projection task. How structure simplifies the projection task and the implications of understanding the benefits structure provides to the projection task was discussed.

  1. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Concurrent junkyard control and right-of-way projects. 751.23 Section 751.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT JUNKYARD CONTROL AND ACQUISITION § 751.23 Concurrent junkyard control and right-of...

  2. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Concurrent junkyard control and right-of-way projects. 751.23 Section 751.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT JUNKYARD CONTROL AND ACQUISITION § 751.23 Concurrent junkyard control and right-of...

  3. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Concurrent junkyard control and right-of-way projects. 751.23 Section 751.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT JUNKYARD CONTROL AND ACQUISITION § 751.23 Concurrent junkyard control and right-of...

  4. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Concurrent junkyard control and right-of-way projects. 751.23 Section 751.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT JUNKYARD CONTROL AND ACQUISITION § 751.23 Concurrent junkyard control and right-of...

  5. An Open Specification for Space Project Mission Operations Control Architectures

    NASA Technical Reports Server (NTRS)

    Hooke, A.; Heuser, W. R.

    1995-01-01

    An 'open specification' for Space Project Mission Operations Control Architectures is under development in the Spacecraft Control Working Group of the American Institute for Aeronautics and Astro- nautics. This architecture identifies 5 basic elements incorporated in the design of similar operations systems: Data, System Management, Control Interface, Decision Support Engine, & Space Messaging Service.

  6. 78 FR 11858 - Applications for New Awards; Arts in Education Model Development and Dissemination Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... the treatment for project participants and, where feasible, for a comparison group of non... in the project (control group). The effect of the project is the average difference in outcomes between the treatment and control groups. Integrating means (i) encouraging the use of high-quality arts...

  7. Version Control in Project-Based Learning

    ERIC Educational Resources Information Center

    Milentijevic, Ivan; Ciric, Vladimir; Vojinovic, Oliver

    2008-01-01

    This paper deals with the development of a generalized model for version control systems application as a support in a range of project-based learning methods. The model is given as UML sequence diagram and described in detail. The proposed model encompasses a wide range of different project-based learning approaches by assigning a supervisory…

  8. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  9. Centipod WEC, Advanced Controls, Resultant LCOE

    DOE Data Explorer

    McCall, Alan

    2016-02-15

    Project resultant LCOE model after implementation of MPC controller. Contains AEP, CBS, model documentation, and LCOE content model. This is meant for comparison with this project's baseline LCOE model.

  10. Technical Requirements Analysis and Control Systems (TRACS) Initial Operating Capability (IOC) documentation

    NASA Technical Reports Server (NTRS)

    Hammond, Dana P.

    1991-01-01

    The Technical Requirements Analysis and Control Systems (TRACS) software package is described. TRACS offers supplemental tools for the analysis, control, and interchange of project requirements. This package provides the fundamental capability to analyze and control requirements, serves a focal point for project requirements, and integrates a system that supports efficient and consistent operations. TRACS uses relational data base technology (ORACLE) in a stand alone or in a distributed environment that can be used to coordinate the activities required to support a project through its entire life cycle. TRACS uses a set of keyword and mouse driven screens (HyperCard) which imposes adherence through a controlled user interface. The user interface provides an interactive capability to interrogate the data base and to display or print project requirement information. TRACS has a limited report capability, but can be extended with PostScript conventions.

  11. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Girolami, Davide

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  12. 18 CFR 12.40 - Quality control programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT WORKS Other Responsibilities of Applicant or Licensee § 12.40 Quality control programs. (a) General rule. During any construction, repair, or modification of project works, including any corrective... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Quality control...

  13. 18 CFR 12.40 - Quality control programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT WORKS Other Responsibilities of Applicant or Licensee § 12.40 Quality control programs. (a) General rule. During any construction, repair, or modification of project works, including any corrective... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Quality control...

  14. 18 CFR 12.40 - Quality control programs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT WORKS Other Responsibilities of Applicant or Licensee § 12.40 Quality control programs. (a) General rule. During any construction, repair, or modification of project works, including any corrective... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Quality control...

  15. Experience with an integrated control and monitoring system at the El Segundo generating station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Papilla, R.P.; McKinley, J.H.; Blanco, M.A.

    1992-01-01

    This paper describes the EPRI/Southern California Edison (SCE) El Segundo Integrated Control and Monitoring System (ICMS) project and relates key project experiences. The ICMS project is a cost-shared effort between EPRI and SCE designed to address the issues involved with integrating power plant diagnostic and condition monitoring with control. A digital distributed control system retrofit for SCE's El Segundo Units 3 and 4 provided the case study. although many utilities have retrofitted power plant units with distributed control systems (DCS's) and have applied diagnostics and monitoring programs to improve operations and performance, the approach taken in this project, that is,more » integrating the monitoring function with the control function, is profoundly new and unique. Over the life of the El Segundo ICMS, SCE expects to realize savings form life optimization, increased operating flexibility, improved heat rate, reduced NO{sub x} emissions, and lower maintenance costs. These savings are expected to be significant over the life of the system.« less

  16. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  17. Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid

    NASA Astrophysics Data System (ADS)

    Kuwayama, Akira

    The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.

  18. Command generator tracker based direct model reference adaptive control of a PUMA 560 manipulator. Thesis

    NASA Technical Reports Server (NTRS)

    Swift, David C.

    1992-01-01

    This project dealt with the application of a Direct Model Reference Adaptive Control algorithm to the control of a PUMA 560 Robotic Manipulator. This chapter will present some motivation for using Direct Model Reference Adaptive Control, followed by a brief historical review, the project goals, and a summary of the subsequent chapters.

  19. Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project

    NASA Technical Reports Server (NTRS)

    Harp, Janice Leshay

    2014-01-01

    This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.

  20. Model-free adaptive sliding mode controller design for generalized projective synchronization of the fractional-order chaotic system via radial basis function neural networks

    NASA Astrophysics Data System (ADS)

    Wang, L. M.

    2017-09-01

    A novel model-free adaptive sliding mode strategy is proposed for a generalized projective synchronization (GPS) between two entirely unknown fractional-order chaotic systems subject to the external disturbances. To solve the difficulties from the little knowledge about the master-slave system and to overcome the bad effects of the external disturbances on the generalized projective synchronization, the radial basis function neural networks are used to approach the packaged unknown master system and the packaged unknown slave system (including the external disturbances). Consequently, based on the slide mode technology and the neural network theory, a model-free adaptive sliding mode controller is designed to guarantee asymptotic stability of the generalized projective synchronization error. The main contribution of this paper is that a control strategy is provided for the generalized projective synchronization between two entirely unknown fractional-order chaotic systems subject to the unknown external disturbances, and the proposed control strategy only requires that the master system has the same fractional orders as the slave system. Moreover, the proposed method allows us to achieve all kinds of generalized projective chaos synchronizations by turning the user-defined parameters onto the desired values. Simulation results show the effectiveness of the proposed method and the robustness of the controlled system.

  1. A model for evaluating the sustainability of community-directed treatment with ivermectin in the African Program for Onchocerciasis Control.

    PubMed

    Okeibunor, Joseph; Bump, Jesse; Zouré, Honorat G M; Sékétéli, Azodoga; Godin, Christine; Amazigo, Uche V

    2012-01-01

    Onchocerciasis is controlled by mass treatment of at-risk populations with ivermectin. Ivermectin is delivered through community-directed treatment (CDTI) approach. A model has been developed to evaluate the sustainability of the approach and has been tested at 35 projects in 10 countries of the African Program for Onchocerciasis Control (APOC). It incorporates quantitative and qualitative data collection and analysis, taking account of two factors identified as crucial to project sustainability. These are (i) the provision of project performance information to partners, and (ii) evidence-based support for project implementation. The model is designed to provide critical indicators of project performance of the model to implementing, coordinating, and funding partners. The model's participatory and flexible nature makes it culturally sensitive and usable by project management. This model is able to analyze the different levels involved in project implementation and arrive at a judgment for the whole project. It has inbuilt mechanisms for ensuring data reliability and validity. The model addresses the complex issue of sustainability with a cross-sectional design focusing on how and at which operational level of implementation to strengthen a CDTI project. The unique attributes and limitations of the model for evaluating the sustainability of projects were described. Copyright © 2012 John Wiley & Sons, Ltd.

  2. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  3. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  4. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  5. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  6. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  7. Version control system of CAD documents and PLC projects

    NASA Astrophysics Data System (ADS)

    Khudyakov, P. Yu; Kisel’nikov, A. Yu; Startcev, I. M.; Kovalev, A. A.

    2018-05-01

    The paper presents the process of developing a version control system for CAD documents and PLC projects. The software was tested and the optimal composition of the modules was selected. The introduction of the system has made it possible to increase the safety and stability of the process control systems, as well as to reduce the number of conflicts for versions of CAD files. The number of incidents at the enterprise related to the use of incorrect versions of PLC projects is reduced to 0.

  8. Additional Cultural Resources Investigations at Selected Portions of the State-Road Coulee - Pammel Creek Flood Control Project at La Crosse, Wisconsin

    DTIC Science & Technology

    1986-05-01

    Mammals: Ten mammal taxa are represented in the Lc176 assemblage. Two of these, the short-tailed shrew (Blarina brevivicauda) and a vole (Microtus sp...ADDITIONAL CULTURAL RESOURCES INVESTIGATIONS AT SELECTED PORTIONS OF THE STATE-ROAD COULEE - PAMMEL CREEK FLOOD CONTROL PROJECT ATm LA CROSSE...INVESTIGATIONS AT SELECTED PORTIONS OF THE STATE-ROAD COULEE- PAMMEL CREEK FLOOD CONTROL PROJECT AT LA CROSSE. WISCONSIN 12. PERSONAL AUTHOR(S

  9. An overview of integrated flight-propulsion controls flight research on the NASA F-15 research airplane

    NASA Technical Reports Server (NTRS)

    Burcham, Frank W., Jr.; Gatlin, Donald H.; Stewart, James F.

    1995-01-01

    The NASA Dryden Flight Research Center has been conducting integrated flight-propulsion control flight research using the NASA F-15 airplane for the past 12 years. The research began with the digital electronic engine control (DEEC) project, followed by the F100 Engine Model Derivative (EMD). HIDEC (Highly Integrated Digital Electronic Control) became the umbrella name for a series of experiments including: the Advanced Digital Engine Controls System (ADECS), a twin jet acoustics flight experiment, self-repairing flight control system (SRFCS), performance-seeking control (PSC), and propulsion controlled aircraft (PCA). The upcoming F-15 project is ACTIVE (Advanced Control Technology for Integrated Vehicles). This paper provides a brief summary of these activities and provides background for the PCA and PSC papers, and includes a bibliography of all papers and reports from the NASA F-15 project.

  10. DBMS as a Tool for Project Management

    NASA Technical Reports Server (NTRS)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  11. Metropolitan transportation management center : a case study : Boston Central Artery/Tunnel Integrated Project control system : responding to incidents rapidly and effectively

    DOT National Transportation Integrated Search

    1999-10-01

    The following case study provides a snapshot of the Boston Central Artery/Tunnel Integration Project Control System (IPCS) operations control center. It follows the outline provided in the companion document, Metropolitan Transportation Management Ce...

  12. The ECLSS Advanced Automation Project Evolution and Technology Assessment

    NASA Technical Reports Server (NTRS)

    Dewberry, Brandon S.; Carnes, James R.; Lukefahr, Brenda D.; Rogers, John S.; Rochowiak, Daniel M.; Mckee, James W.; Benson, Brian L.

    1990-01-01

    Viewgraphs on Environmental Control and Life Support System (ECLSS) advanced automation project evolution and technology assessment are presented. Topics covered include: the ECLSS advanced automation project; automatic fault diagnosis of ECLSS subsystems descriptions; in-line, real-time chemical and microbial fluid analysis; and object-oriented, distributed chemical and microbial modeling of regenerative environmental control systems description.

  13. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    ERIC Educational Resources Information Center

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  14. A Multidisciplinary PBL Robot Control Project in Automation and Electronic Engineering

    ERIC Educational Resources Information Center

    Hassan, Houcine; Domínguez, Carlos; Martínez, Juan-Miguel; Perles, Angel; Capella, Juan-Vicente; Albaladejo, José

    2015-01-01

    This paper presents a multidisciplinary problem-based learning (PBL) project consisting of the development of a robot arm prototype and the implementation of its control system. The project is carried out as part of Industrial Informatics (II), a compulsory third-year course in the Automation and Electronic Engineering (AEE) degree program at the…

  15. The Partnership between Project Management and Organizational Change: Integrating Change Management with Change Leadership

    ERIC Educational Resources Information Center

    Griffith-Cooper, Barber; King, Karyl

    2007-01-01

    The nature of project management is change. Even though all knowledge areas in the Project Management Body of Knowledge (PMBOK) are rooted in controlling change, none of these areas specifically addresses the human elements of change. There is a significant distinction between directly controlling change relative to the nonhuman aspects of a…

  16. Nursing Project Management to Reduce the Operating Room Infection.

    PubMed

    Chen, Yuanyuan; Han, Xiaodao; Xu, Yongjie; Li, Weihua

    2017-02-01

    Nursing project management is widely used in different aspects of the society. However, whether the nursing project management can control the infections in the operation room (OR) is rarely reported. We evaluated the outcomes of surgical patients after implementing a nursing project management program to provide new scientific ways to manage the OR infections. Overall, 382 patients, who underwent surgical treatment in Qilu Hospital of Shandong University, Shandong, China from May 2015 to January 2016, were enrolled as observation group. Besides, 347 cases were selected as control group. Patients in the observation group were treated with the nursing project management plan, while patients in the control group were treated with the routine operation-room nursing measures. The infection control rates in the OR, and the patient satisfaction with the nursing team postoperatively were both compared between the two groups of patients. The OR air, the surgical and personnel's hands surfaces were sampled for colony forming units, and all were found to be significantly of better quality (indicated by less colony forming units) in the observation group (P<0.001). In addition, there were 3 cases (0.79%) of post-operation infections in the observation group, while 12 cases (3.46%) occurred in the control group. The overall infection rate of the observation group was significantly lower than that of the control group (P = 0.011); and the satisfaction of patients with the nursing team in the observation group was significantly higher than that of the patients in the control group ( P = 0.001). It is worth popularizing and applying a good nursing project management plan for surgical patients in hospitals.

  17. MD-11 PCA - Research flight team photo

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On Aug. 30, 1995, a the McDonnell Douglas MD-11 transport aircraft landed equipped with a computer-assisted engine control system that has the potential to increase flight safety. In landings at NASA Dryden Flight Research Center, Edwards, California, on August 29 and 30, the aircraft demonstrated software used in the aircraft's flight control computer that essentially landed the MD-11 without a need for the pilot to manipulate the flight controls significantly. In partnership with McDonnell Douglas Aerospace (MDA), with Pratt & Whitney and Honeywell helping to design the software, NASA developed this propulsion-controlled aircraft (PCA) system following a series of incidents in which hydraulic failures resulted in the loss of flight controls. This new system enables a pilot to operate and land the aircraft safely when its normal, hydraulically-activated control surfaces are disabled. This August 29, 1995, photo shows the MD-11 team. Back row, left to right: Tim Dingen, MDA pilot; John Miller, MD-11 Chief pilot (MDA); Wayne Anselmo, MD-11 Flight Test Engineer (MDA); Gordon Fullerton, PCA Project pilot; Bill Burcham, PCA Chief Engineer; Rudey Duran, PCA Controls Engineer (MDA); John Feather, PCA Controls Engineer (MDA); Daryl Townsend, Crew Chief; Henry Hernandez, aircraft mechanic; Bob Baron, PCA Project Manager; Don Hermann, aircraft mechanic; Jerry Cousins, aircraft mechanic; Eric Petersen, PCA Manager (Honeywell); Trindel Maine, PCA Data Engineer; Jeff Kahler, PCA Software Engineer (Honeywell); Steve Goldthorpe, PCA Controls Engineer (MDA). Front row, left to right: Teresa Hass, Senior Project Management Analyst; Hollie Allingham (Aguilera), Senior Project Management Analyst; Taher Zeglum, PCA Data Engineer (MDA); Drew Pappas, PCA Project Manager (MDA); John Burken, PCA Control Engineer.

  18. 76 FR 28437 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial Review The meeting... Disease or Treated by Assisted Reproductive Technology, SIP11-048, Panel F,'' initial review In accordance...

  19. Student Volunteers as Birth Control Educators

    ERIC Educational Resources Information Center

    Sanders, Raymond S.; And Others

    1978-01-01

    A one-year project on birth control education that used students as birth control educators was initiated to increase student awareness of the need for contraception. Support for this method of disseminating information was demonstrated. The project facilitated student use of the Gynecological Clinic of the Student Health Center. (Author)

  20. Serials Control and Deselection Projects. SPEC Kit 147.

    ERIC Educational Resources Information Center

    Association of Research Libraries, Washington, DC. Office of Management Studies.

    This Systems and Procedures Exchange Center (SPEC) Kit on serials control and deselection projects provides a timely review of the efforts of research libraries to control the increasing costs of serial subscriptions. This kit contains documents from 13 libraries: University of California at Los Angeles and Riverside; Universities of Florida,…

  1. Applying Water-Level Difference Control to Central Arizona Project

    USDA-ARS?s Scientific Manuscript database

    The Central Arizona Project (CAP) has been supplying Colorado River water to Central Arizona for roughly 25 years. The CAP canal is operated remotely with a Supervisory Control and Data Acquisition (SCADA) System. Gate position changes are made either manually or through the use of automatic control...

  2. 33 CFR 240.6 - General policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... they generally make reference to flood control “projects,” should be understood to have equivalent... subsequent maintenance of the creditable non-Federal flood control work will not be credited. In the event... GENERAL CREDIT FOR FLOOD CONTROL § 240.6 General policy. (a) Section 104 is applicable only to projects...

  3. 33 CFR 240.6 - General policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... they generally make reference to flood control “projects,” should be understood to have equivalent... subsequent maintenance of the creditable non-Federal flood control work will not be credited. In the event... GENERAL CREDIT FOR FLOOD CONTROL § 240.6 General policy. (a) Section 104 is applicable only to projects...

  4. 33 CFR 240.6 - General policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... they generally make reference to flood control “projects,” should be understood to have equivalent... subsequent maintenance of the creditable non-Federal flood control work will not be credited. In the event... GENERAL CREDIT FOR FLOOD CONTROL § 240.6 General policy. (a) Section 104 is applicable only to projects...

  5. 33 CFR 240.6 - General policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... they generally make reference to flood control “projects,” should be understood to have equivalent... subsequent maintenance of the creditable non-Federal flood control work will not be credited. In the event... GENERAL CREDIT FOR FLOOD CONTROL § 240.6 General policy. (a) Section 104 is applicable only to projects...

  6. 33 CFR 240.6 - General policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... they generally make reference to flood control “projects,” should be understood to have equivalent... subsequent maintenance of the creditable non-Federal flood control work will not be credited. In the event... GENERAL CREDIT FOR FLOOD CONTROL § 240.6 General policy. (a) Section 104 is applicable only to projects...

  7. Devils Lake Flood Control Project. Section 205. Detailed Project Report.

    DTIC Science & Technology

    1983-10-01

    Sd.U.JS IWE 00 RlEP0OAT II PERIOD COVERED SE~CTION 205 DETAILED PROJECT REPORT FLOOD CONTROL Final. Oct 1979-July 1983 PROJECT AT DEVILS LAKE. NORTH...a few feet. The light loading proposed for the site and thick cover of impervious material make more detailed evaluation of the strength and water...can cause low-oapaoity channels to overflow, resulting in flood damages to crops . Because the subbasin has no outlet near the existing water surface

  8. Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project

    NASA Astrophysics Data System (ADS)

    Jiang, Weijin; Xu, Yuhui

    Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.

  9. Projective synchronization of nonidentical fractional-order neural networks based on sliding mode controller.

    PubMed

    Ding, Zhixia; Shen, Yi

    2016-04-01

    This paper investigates global projective synchronization of nonidentical fractional-order neural networks (FNNs) based on sliding mode control technique. We firstly construct a fractional-order integral sliding surface. Then, according to the sliding mode control theory, we design a sliding mode controller to guarantee the occurrence of the sliding motion. Based on fractional Lyapunov direct methods, system trajectories are driven to the proposed sliding surface and remain on it evermore, and some novel criteria are obtained to realize global projective synchronization of nonidentical FNNs. As the special cases, some sufficient conditions are given to ensure projective synchronization of identical FNNs, complete synchronization of nonidentical FNNs and anti-synchronization of nonidentical FNNs. Finally, one numerical example is given to demonstrate the effectiveness of the obtained results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. Project SUCCESS' Effects on Substance Use-Related Attitudes and Behaviors: A Randomized Controlled Trial in Alternative High Schools

    ERIC Educational Resources Information Center

    Clark, Heddy Kovach; Ringwalt, Chris L.; Shamblen, Stephen R.; Hanley, Sean M.

    2011-01-01

    Using a randomized controlled effectiveness trial, we examined the effects of Project SUCCESS on a range of secondary outcomes, including the program's mediating variables. Project SUCCESS, which is based both on the Theory of Reasoned Action and on Cognitive Behavior Theory, is a school-based substance use prevention program that targets…

  11. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    ERIC Educational Resources Information Center

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  12. Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Cotton, Will; Liechty, John

    2015-01-01

    This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.

  13. Project-Based Learning in Programmable Logic Controller

    NASA Astrophysics Data System (ADS)

    Seke, F. R.; Sumilat, J. M.; Kembuan, D. R. E.; Kewas, J. C.; Muchtar, H.; Ibrahim, N.

    2018-02-01

    Project-based learning is a learning method that uses project activities as the core of learning and requires student creativity in completing the project. The aims of this study is to investigate the influence of project-based learning methods on students with a high level of creativity in learning the Programmable Logic Controller (PLC). This study used experimental methods with experimental class and control class consisting of 24 students, with 12 students of high creativity and 12 students of low creativity. The application of project-based learning methods into the PLC courses combined with the level of student creativity enables the students to be directly involved in the work of the PLC project which gives them experience in utilizing PLCs for the benefit of the industry. Therefore, it’s concluded that project-based learning method is one of the superior learning methods to apply on highly creative students to PLC courses. This method can be used as an effort to improve student learning outcomes and student creativity as well as to educate prospective teachers to become reliable educators in theory and practice which will be tasked to create qualified human resources candidates in order to meet future industry needs.

  14. Deploying Applications on the Peregrine System | High-Performance Computing

    Science.gov Websites

    ;write" access to ecom, email wesley.jones@nrel.gov For collaboration across a single project, we the /projects/project> directory that is visible to everyone associated with the project , and can be controlled completely by the project staff. By adding a /projects/project>

  15. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry

    2010-01-01

    The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

  16. Management evolution in the LSST project

    NASA Astrophysics Data System (ADS)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  17. The algorithm for duration acceleration of repetitive projects considering the learning effect

    NASA Astrophysics Data System (ADS)

    Chen, Hongtao; Wang, Keke; Du, Yang; Wang, Liwan

    2018-03-01

    Repetitive project optimization problem is common in project scheduling. Repetitive Scheduling Method (RSM) has many irreplaceable advantages in the field of repetitive projects. As the same or similar work is repeated, the proficiency of workers will be correspondingly low to high, and workers will gain experience and improve the efficiency of operations. This is learning effect. Learning effect is one of the important factors affecting the optimization results in repetitive project scheduling. This paper analyzes the influence of the learning effect on the controlling path in RSM from two aspects: one is that the learning effect changes the controlling path, the other is that the learning effect doesn't change the controlling path. This paper proposes corresponding methods to accelerate duration for different types of critical activities and proposes the algorithm for duration acceleration based on the learning effect in RSM. And the paper chooses graphical method to identity activities' types and considers the impacts of the learning effect on duration. The method meets the requirement of duration while ensuring the lowest acceleration cost. A concrete bridge construction project is given to verify the effectiveness of the method. The results of this study will help project managers understand the impacts of the learning effect on repetitive projects, and use the learning effect to optimize project scheduling.

  18. Environment and health: Probes and sensors for environment digital control

    NASA Astrophysics Data System (ADS)

    Schettini, Chiara

    2014-05-01

    The idea of studying the environment using New Technologies (NT) came from a MIUR (Ministry of Education of the Italian Government) notice that allocated funds for the realization of innovative school science projects. The "Environment and Health" project uses probes and sensors for digital control of environment (water, air and soil). The working group was composed of 4 Science teachers from 'Liceo Statale G. Mazzini ', under the coordination of teacher Chiara Schettini. The Didactic Section of Naples City of Sciences helped the teachers in developing the project and it organized a refresher course for them on the utilization of digital control sensors. The project connects Environment and Technology because the study of the natural aspects and the analysis of the chemical-physical parameters give students and teachers skills for studying the environment based on the utilization of NT in computing data elaboration. During the practical project, samples of air, water and soil are gathered in different contexts. Sample analysis was done in the school's scientific laboratory with digitally controlled sensors. The data are elaborated with specific software and the results have been written in a booklet and in a computing database. During the first year, the project involved 6 school classes (age of the students 14—15 years), under the coordination of Science teachers. The project aims are: 1) making students more aware about environmental matters 2) achieving basic skills for evaluating air, water and soil quality. 3) achieving strong skills for the utilization of digitally controlled sensors. 4) achieving computing skills for elaborating and presenting data. The project aims to develop a large environmental conscience and the need of a ' good ' environment for defending our health. Moreover it would increase the importance of NT as an instrument of knowledge.

  19. Viewing-zone control of integral imaging display using a directional projection and elemental image resizing method.

    PubMed

    Alam, Md Ashraful; Piao, Mei-Lan; Bang, Le Thanh; Kim, Nam

    2013-10-01

    Viewing-zone control of integral imaging (II) displays using a directional projection and elemental image (EI) resizing method is proposed. Directional projection of EIs with the same size of microlens pitch causes an EI mismatch at the EI plane. In this method, EIs are generated computationally using a newly introduced algorithm: the directional elemental image generation and resizing algorithm considering the directional projection geometry of each pixel as well as an EI resizing method to prevent the EI mismatch. Generated EIs are projected as a collimated projection beam with a predefined directional angle, either horizontally or vertically. The proposed II display system allows reconstruction of a 3D image within a predefined viewing zone that is determined by the directional projection angle.

  20. Performance of Recycled Hot Mix Asphalt Mixtures

    DOT National Transportation Integrated Search

    1995-05-01

    This research project was undertaken to evaluate the performance of recycled pavements in comparison to virgin (control) asphalt pavements. Five projects, each consisting of a recycled section and a control section, were subjected to detailed evaluat...

  1. Controls Over Project Management Oversight Program

    DOT National Transportation Integrated Search

    1997-12-08

    This is the final report on Federal Transit Administration's (FTA) controls over its Project Management Oversight (PMO) Program. This report reflects Office of Inspector General's (OIG) consideration of information provided in FTA's May 29, 1997, rep...

  2. Talking About The Smokes: a large-scale, community-based participatory research project.

    PubMed

    Couzos, Sophia; Nicholson, Anna K; Hunt, Jennifer M; Davey, Maureen E; May, Josephine K; Bennet, Pele T; Westphal, Darren W; Thomas, David P

    2015-06-01

    To describe the Talking About The Smokes (TATS) project according to the World Health Organization guiding principles for conducting community-based participatory research (PR) involving indigenous peoples, to assist others planning large-scale PR projects. The TATS project was initiated in Australia in 2010 as part of the International Tobacco Control Policy Evaluation Project, and surveyed a representative sample of 2522 Aboriginal and Torres Strait Islander adults to assess the impact of tobacco control policies. The PR process of the TATS project, which aimed to build partnerships to create equitable conditions for knowledge production, was mapped and summarised onto a framework adapted from the WHO principles. Processes describing consultation and approval, partnerships and research agreements, communication, funding, ethics and consent, data and benefits of the research. The TATS project involved baseline and follow-up surveys conducted in 34 Aboriginal community-controlled health services and one Torres Strait community. Consistent with the WHO PR principles, the TATS project built on community priorities and strengths through strategic partnerships from project inception, and demonstrated the value of research agreements and trusting relationships to foster shared decision making, capacity building and a commitment to Indigenous data ownership. Community-based PR methodology, by definition, needs adaptation to local settings and priorities. The TATS project demonstrates that large-scale research can be participatory, with strong Indigenous community engagement and benefits.

  3. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  4. Projections from Bed Nuclei of the Stria Terminalis, Magnocellular Nucleus: Implications for Cerebral Hemisphere Regulation of Micturition, Defecation, and Penile Erection

    PubMed Central

    DONG, HONG-WEI; SWANSON, LARRY W.

    2008-01-01

    The basic structural organization of axonal projections from the small but distinct magnocellular and ventral nuclei (of the bed nuclei of the stria terminalis) were analyzed with the PHAL anterograde tract tracing method in adult male rats. The former's overall projection pattern is complex, with over 80 distinct terminal fields ipsilateral to injection sites. Innervated regions in the cerebral hemisphere and brainstem fall into 9 general functional categories: cerebral nuclei, behavior control column, orofacial motor-related, humorosensory/thirst-related, brainstem autonomic control network, neuroendocrine, hypothalamic visceromotor pattern generator network, thalamocortical feedback loops, and behavioral state control. The most novel findings indicate that the magnocellular nucleus projects to virtually all known major parts of the brain network that controls pelvic functions including micturition, defecation, and penile erection—as well as to brain networks controlling nutrient and body water homeostasis. This and other evidence suggests that the magnocellular nucleus is part of a cortico-striatopallidal differentiation modulating and coordinating pelvic functions with the maintenance of nutrient and body water homeostasis. Projections of the ventral nucleus are a subset of those generated by the magnocellular nucleus, with the obvious difference that the ventral nucleus does not project detectably to Barrington's nucleus, the subfornical organ, the median preoptic and parastrial nuclei, the neuroendocrine system, and midbrain orofacial motor-related regions. PMID:16304682

  5. The conceptual framework of the International Tobacco Control (ITC) Policy Evaluation Project

    PubMed Central

    Fong, G T; Cummings, K M; Borland, R; Hastings, G; Hyland, A; Giovino, G A; Hammond, D; Thompson, M E

    2006-01-01

    This paper describes the conceptual model that underlies the International Tobacco Control Policy Evaluation Project (ITC Project), whose mission is to measure the psychosocial and behavioural impact of key policies of the Framework Convention on Tobacco Control (FCTC) among adult smokers, and in some countries, among adult non‐smokers and among youth. The evaluation framework utilises multiple country controls, a longitudinal design, and a pre‐specified, theory‐driven conceptual model to test hypotheses about the anticipated effects of specific policies. The ITC Project consists of parallel prospective cohort surveys of representative samples of adult smokers currently in nine countries (inhabited by over 45% of the world's smokers), with other countries being added in the future. Collectively, the ITC Surveys constitute the first‐ever international cohort study of tobacco use. The conceptual model of the ITC Project draws on the psychosocial and health communication literature and assumes that tobacco control policies influence tobacco related behaviours through a causal chain of psychological events, with some variables more closely related to the policy itself (policy‐specific variables) and other variables that are more downstream from the policy, which have been identified by health behaviour and social psychological theories as being important causal precursors of behaviour (psychosocial mediators). We discuss the objectives of the ITC Project and its potential for building the evidence base for the FCTC. PMID:16754944

  6. Assessing the effect of desertification controlling projects and policies in northern Shaanxi Province, China by integrating remote sensing and farmer investigation data

    NASA Astrophysics Data System (ADS)

    Xu, Duanyang; Song, Alin; Song, Xiao

    2017-12-01

    To combat desertification, the Chinese government has launched a series of Desertification Controlling Projects and Policies over the past several decades. However, the effect of these projects and policies remains controversial due to a lack of suitable methods and data to assess them. In this paper, the authors selected the farming-pastoral region of the northern Shaanxi Province in China as a sample region and attempted to assess the effect of Desertification Controlling Projects and Policies launched after 2000 by combining remote sensing and farmer investigation data. The results showed that the combination of these two complementary assessments can provide comprehensive information to support decision-making. According to the remote sensing and Net Primary Production data, the research region experienced an obvious desertification reversion between 2000 and 2010, and approximately 70% of this reversion can be explained by Desertification Controlling Projects and Policies. Farmer investigation data also indicated that these projects and policies were the dominating factor contributing to desertification reversion, and approximately 70% of investigated farmers agreed with this conclusion. However, low supervision and subsidy levels were issues that limited the policy effect. Therefore, it is necessary for the government to enhance supervision, raise subsidy levels, and develop environmental protection regulations to encourage more farmers to participate in desertification control.

  7. Patenting the bomb: nuclear weapons, intellectual property, and technological control.

    PubMed

    Wellerstein, Alex

    2008-03-01

    During the course of the Manhattan Project, the U.S. government secretly attempted to acquire a monopoly on the patent rights for inventions used in the production of nuclear weapons and nuclear energy. The use of patents as a system of control, while common for more mundane technologies, would seem at first glance to conflict with the regimes of secrecy that have traditionally been associated with nuclear weapons. In explaining the origins and operations of the Manhattan Project patent system, though, this essay argues that the utilization of patents was an ad hoc attempt at legal control of the atomic bomb by Manhattan Project administrators, focused on the monopolistic aspects of the patent system and preexisting patent secrecy legislation. From the present perspective, using patents as a method of control for such weapons seems inadequate, if not unnecessary; but at the time, when the bomb was a new and essentially unregulated technology, patents played an important role in the thinking of project administrators concerned with meaningful postwar control of the bomb.

  8. Murchison project organization and control. [North Sea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lauzen, P.K.; Hall, J.N.

    This paper describes the project management organization and the management control systems used for Conoco's Murchison field development in the North Sea. These systems created for Murchison proved largely successful and have been enhanced for use during the Hutton field development. Management concepts are described in the context of the cost control system.

  9. Evaluation of the USDA Northeast Area-wide Tick Control Project by Meta-analysis

    USDA-ARS?s Scientific Manuscript database

    As part of the Northeast Area-wide Tick Control Project (NEATCP), meta-analyses were performed using pooled data on the extent of tick-vector control achieved through seven concurrent studies, conducted within five states, using USDA ‘4-Poster’ devices to deliver targeted-acaricide to white-tailed d...

  10. [Evaluation on cost-effectiveness of snail control project by environmental modification in hilly regions].

    PubMed

    Li, Shui-Ming; Chen, Shi-Jun; Wu, Xiao-Jun; Chen, Xi-Qing; Zhang, Rong-Ping; Zhang, Jian-Rong

    2011-02-01

    To evaluate the cost-effectiveness of the snail control project by environmental modification in order to provide the evidence for quickly interrupting the transmission of schistosomiasis in hilly regions. Field investigations were carried out. The changes of the snail habitat areas were compared before and after the snail control project. The direct costs of the snail control were calculated. The reduction rates of snail area and snail density were regarded as the evaluation indexes of the effectiveness. The costs for reduction of 1% of snail area and 1% of snail density were used as the unit for cost-effectiveness analysis. After the 15 projects were implemented, there were no snails in 12 areas. The reduction rates of snail areas were 72.22% to 100%. The reduction rates of the snail area and density were both 100% in the areas with digging new ditches to fill up the old ones and building reservoirs. The total cost of 15 projects was 1 450 800 Yuan. The average cost per unit was 0.56 Yuan/m2. After the snail control project by digging new ditches to fill up the old ones was implemented, the costs of snail area and density decreased by one unit were 300 -700 Yuan, by building reservoirs, the costs were 600 -2 600 Yuan, by building fishpond, the costs were 1 200 - 1 500 Yuan, by watershed comprehensive measures, the costs were 900 - 2 700 Yuan. The cost of digging new ditches to fill up the old ones was significantly lower than that of building reservoirs or watershed comprehensive measures, but there was no significant difference between building reservoirs and watershed comprehensive measures. In hilly regions, the implementation of snail control project by environmental modification combined with construction of water conservancy is effective, and the cost-effectiveness of the snail control with digging new ditches to fill up the old ones is excellent.

  11. Improving tuberculosis control through public-private collaboration in India: literature review.

    PubMed

    Dewan, Puneet K; Lal, S S; Lonnroth, Knut; Wares, Fraser; Uplekar, Mukund; Sahu, Suvanand; Granich, Reuben; Chauhan, Lakhbir Singh

    2006-03-11

    To review the characteristics of public-private mix projects in India and their effect on case notification and treatment outcomes for tuberculosis. Literature review. Review of surveillance records from Indian tuberculosis programme project, evaluation reports, and medical literature for public-private mix projects in India. Project characteristics, tuberculosis case notification of new patients with sputum smear results positive for acid fast bacilli, and treatment outcome. Of 24 identified public-private mix projects, data were available from 14 (58%), involving private practitioners, corporations, and non-governmental organisations. In all reviewed projects, the public sector tuberculosis programme provided training and supervision of private providers. Among the five projects with available data on historical controls, case notification rates were higher after implementation of a public-private mix project. Among seven projects involving private practitioners, 2796 of 12 147 (23%) new patients positive for acid fast bacilli were attributed to private providers. Corporate based and non-governmental organisations served as the main source for tuberculosis programme services in seven project areas, detecting 9967 new patients positive for acid fast bacilli. In nine of 12 projects with data on treatment outcomes, private providers exceeded the programme target of 85% treatment success for new patients positive for acid fast bacilli. Public-private mix activities were associated with increased case notification, while maintaining acceptable treatment outcomes. Collaborations between public and private providers of health care hold considerable potential to improve tuberculosis control in India.

  12. Student design projects in applied acoustics.

    PubMed

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  13. Developing a Systematic Corrosion Control Evaluation Approach in Flint

    EPA Science Inventory

    Presentation covers what the projects were that were recommended by the Flint Safe Drinking Water Task Force for corrosion control assessment for Flint, focusing on the sequential sampling project, the pipe rigs, and pipe scale analyses.

  14. Evaluation of traffic control devices : fifth-year activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This project was established to provide a means of conducting limited scope evaluations of numerous traffic : control device issues. During the fifth, and final, year of the project, researchers conducted four activities: : improving the interface fo...

  15. The Architecture and Application of RAMSES, a CCSDS and ECSS PUS Compliant Test and Control System

    NASA Astrophysics Data System (ADS)

    Battelino, Milan; Svard, Christian; Carlsson, Anna; Carlstedt-Duke, Theresa; Tornqvist, Marcus

    2010-08-01

    SSC, Swedish Space Corporation, has more than 30 years of experience in developing test and control systems for sounding rockets, experimental test modules and satellites. The increasing amount of ongoing projects made SSC to consider developing a test and control system conformant to CCSDS (Consultative Committee for Space Data Systems) and ECSS (European Cooperation for Space Standardization), that with small effort and cost, could be reused between separate projects and products. The foreseen reduction in cost and development time for different future space-related projects made such a reusable control system desirable. This paper will describe the ideas behind the RAMSES (Rocket and Multi-Satellite EMCS Software) system, its architecture and how it has been and is being used in a variety of applications at SSC such as the multi-satellite mission PRISMA and sounding rocket project MAXUS-8.

  16. NPS alternate techsat satellite, design project for AE-4871

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This project was completed as part of AE-4871, Advanced Spacecraft Design. The intent of the course is to provide experience in the design of all the major components in a spacecraft system. Team members were given responsibility for the design of one of the six primary subsystems: power, structures, propulsion, attitude control, telemetry, tracking and control (TT&C), and thermal control. In addition, a single member worked on configuration control, launch vehicle integration, and a spacecraft test plan. Given an eleven week time constraint, a preliminary design of each subsystem was completed. Where possible, possible component selections were also made. Assistance for this project came principally from the Naval Research Laboratory's Spacecraft Technology Branch. Specific information on components was solicited from representatives in industry. The design project centers on a general purpose satellite bus that is currently being sought by the Strategic Defense Initiative.

  17. Controlled cooling of an electronic system based on projected conditions

    DOEpatents

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2016-05-17

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  18. Controlled cooling of an electronic system based on projected conditions

    DOEpatents

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  19. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    NASA Technical Reports Server (NTRS)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  20. An experimental therapeutics test of whether adding dissonance-induction activities improves the effectiveness of a selective obesity and eating disorder prevention program.

    PubMed

    Stice, E; Rohde, P; Shaw, H; Gau, J M

    2018-03-01

    Compare the Healthy Weight obesity and eating disorder prevention program, which promotes participant-driven gradual lifestyle changes to bring energy intake and expenditure into balance, to a new intervention, Project Health, which adds activities to create cognitive dissonance about unhealthy eating, a sedentary lifestyle, and excess body fat, and an obesity education video-control condition. College students at risk for both outcomes because of weight concerns (N=364, 72% female) were randomized to condition, completing pretest, posttest, and 6, 12 and 24-month follow-up assessments. Project Health participants showed significantly smaller increases in measured body mass index (BMI) through 2-year follow-up than both Healthy Weight participants and controls (both d=-0.18), and significantly lower onset of overweight/obesity over 2-year follow-up than Healthy Weight participants and controls (13 vs 21% and 22%). Healthy Weight and Project Health participants showed significantly greater eating disorder symptom reductions than controls through 2-year follow-up. Healthy Weight and Project Health participants showed marginally lower eating disorder onset over follow-up than controls (3 and 3% vs 8% respectively). The reduced increases in BMI and future overweight/obesity onset for Project Health relative to both an active matched intervention and a minimal intervention control condition are noteworthy, especially given the short 6-h intervention duration. The reduction in eating disorder symptoms for Healthy Weight and Project Health relative to controls was also encouraging. Results suggest that adding dissonance-induction activities increased weight loss effects. Yet, effects for both were generally small and the eating disorder onset prevention effects were only marginal, potentially because intervention groups included both sexes, which reduced eating disorder incidence and sensitivity.

  1. Earth Science: 49 Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book offers a large collection of Earth science projects and project ideas for students, teachers, and parents. The projects described are complete but can also be used as spring boards to create expanded projects. Overviews, organizational direction, suggested hypotheses, materials, procedures, and controls are provided. The projects…

  2. Maintenance of Certification Part IV Quality-Improvement Project for Hypertension Control: A Preliminary Retrospective Analysis

    PubMed Central

    Kolasinski, Vallerie A; Price, David W

    2015-01-01

    Context: A Maintenance of Certification Part IV project was created on the basis of an existing, multifaceted hypertension improvement program. Objective: To evaluate the impact of the Maintenance of Certification project, the effects of the improvement options on blood pressure control in hypertensive patients, and the participants’ perception of the workload related to participation in the project. Design: Nonexperimental retrospective analysis. Setting: Kaiser Permanente hospitals and medical office buildings in Northern California. Intervention: Participants used one or more options from a defined menu of strategies to attempt to increase the percentage of hypertensive patients on their patient panels who had controlled blood pressure. Main Outcome Measure: Proportion of hypertensive patients with blood pressure ≤ 139/89 mm Hg. Results: Fifty-two American Board of Family Medicine and 19 American Board of Internal Medicine certified physicians completed projects. Mean panel blood pressure control improved from 79.49% (standard deviation [SD] = 11.32) to 84.64% (SD = 7.80). The choice of improvement option was not associated with the level of improvement or with the participants’ perception of the workload related to completing the project. Conclusion: Project participants improved the care of their patients without an increased perceived burden to their practice. We found no association between the choice of improvement option and either the level of improvement or the perception of workload. PMID:25785642

  3. Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

    NASA Technical Reports Server (NTRS)

    Scarffe, V. A.

    2002-01-01

    NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

  4. Aquatic Plant Control Research Program: Literature Review of Economic Valuation of Aquatic Plant Control

    DTIC Science & Technology

    1991-02-01

    200 words) Aquatic plant control is necessary to maintain the flow of benefits for which water resources projects are constructed and operated (e.g...but little work has been performed by the Corps to evaluate the economic benefits resulting from aquatic plant control programs. This report reviewed...the applicability of the project evaluation guidance, Principles and Guidelines (P&G), for the eval- uation of aquatic plant control benefits . It was

  5. Finite-time hybrid projective synchronization of the drive-response complex networks with distributed-delay via adaptive intermittent control

    NASA Astrophysics Data System (ADS)

    Cheng, Lin; Yang, Yongqing; Li, Li; Sui, Xin

    2018-06-01

    This paper studies the finite-time hybrid projective synchronization of the drive-response complex networks. In the model, general transmission delays and distributed delays are also considered. By designing the adaptive intermittent controllers, the response network can achieve hybrid projective synchronization with the drive system in finite time. Based on finite-time stability theory and several differential inequalities, some simple finite-time hybrid projective synchronization criteria are derived. Two numerical examples are given to illustrate the effectiveness of the proposed method.

  6. Cryogenic ribbon-cutting

    NASA Image and Video Library

    2011-03-30

    NASA cut the ribbon on a new cryogenics control center at John C. Stennis Space Center on March 30. The new facility is part of a project to strengthen Stennis facilities to withstand the impacts of future storms like hurricane Katrina in 2005. Participants in the ribbon-cutting included (l to r): Jason Zuckerman, director of project management for The McDonnel Group; Keith Brock, director of the NASA Project Directorate at Stennis; Stennis Deputy Director Rick Gilbrech; Steve Jackson of Jacobs Technology; and Troy Frisbie, Cryo Control Center Construction project manager for NASA Center Operations at Stennis.

  7. Emily Evans | NREL

    Science.gov Websites

    Evans Emily Evans Project Controller Emily.Evans@nrel.gov | 303-275-3125 Emily joined NREL in 2010 . As a Project Administrator in the Integrated Applications Center, Emily works with project managers and teams to develop and maintain project management excellence on large-scale, multi-year projects

  8. F-15 837 IFCS Intelligent Flight Control System Project

    NASA Technical Reports Server (NTRS)

    Bosworth, John T.

    2007-01-01

    This viewgraph presentation reviews the use of Intelligent Flight Control System (IFCS) for the F-15. The goals of the project are: (1) Demonstrate Revolutionary Control Approaches that can Efficiently Optimize Aircraft Performance in both Normal and Failure Conditions (2) Advance Neural Network-Based Flight Control Technology for New Aerospace Systems Designs. The motivation for the development are to reduce the chance and skill required for survival.

  9. Rebuilding Habitat and Shoreline Resilience through Improved Flood Control Project

    EPA Pesticide Factsheets

    Information about the SFBWQP Rebuilding Habitat and Shoreline Resilience through Improved Flood Control Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  10. Embankment quality and assessment of moisture control implementation : tech transfer summary.

    DOT National Transportation Integrated Search

    2016-02-01

    The motivation for this project was based on work by : Iowa State University (ISU) researchers at a few recent : grading projects that demonstrated embankments were : being constructed outside moisture control limits, even : though the contractor QC ...

  11. 76 FR 19753 - Intent To Prepare a Draft Environmental Impact Statement for the `Īao Stream Flood Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... Environmental Impact Statement for the `[Imacr]ao Stream Flood Control Project, Wailuku, Maui, HI AGENCY... Project, Wailuku, Maui, HI. This effort is being proposed under Section 203 of the Flood Control Act of...), Building 230, Fort Shafter, HI 96858- 5440. Submit electronic comments to [email protected] . FOR...

  12. 76 FR 77554 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Growing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... applicants to Project GATE were randomly assigned to either a program group or a control group. The project... telephone survey of participants and control group members was conducted to collect three waves of data at... program group or a control group. Members of the program group are eligible to receive GATE II services...

  13. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small beach erosion control....26 Small beach erosion control project authority (Section 103). (a) Legislative authority. Section 103(a) of the River and Harbor Act of 1962, as amended by section 310 of the River and Harbor Act of...

  14. 75 FR 28626 - Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): SIP 10...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): SIP 10-029, Pilot Study--Cancer Survivorship Care Planning & SIP 10-030, Evaluating Special Events as a Recruitment Strategy for Cancer Screening, Initial Review In accordance...

  15. 78 FR 49282 - Renewal of Agency Information Collection for Reporting Systems for Public Law 102-477...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... System for Public Law 102-477 Demonstration Project authorized by OMB Control Number 1076-0135. This... OMB Control Number 1076-0135, Reporting System for Public Law 102-477 Demonstration Project. This... public review, we cannot guarantee that we will be able to do so. III. Data OMB Control Number: 1076-0135...

  16. The Use of the Nelder-Mead Method in Determining Projection Parameters for Globe Photographs

    NASA Astrophysics Data System (ADS)

    Gede, M.

    2009-04-01

    A photo of a terrestrial or celestial globe can be handled as a map. The only hard issue is its projection: the so-called Tilted Perspective Projection which, if the optical axis of the photo intersects the globe's centre, is simplified to the Vertical Near-Side Perspective Projection. When georeferencing such a photo, the exact parameters of the projections are also needed. These parameters depend on the position of the viewpoint of the camera. Several hundreds of globe photos had to be georeferenced during the Virtual Globes Museum project, which made necessary to automatize the calculation of the projection parameters. The author developed a program for this task which uses the Nelder-Mead Method in order to find the optimum parameters when a set of control points are given as input. The Nelder-Mead method is a numerical algorithm for minimizing a function in a many-dimensional space. The function in the present application is the average error of the control points calculated from the actual values of parameters. The parameters are the geographical coordinates of the projection centre, the image coordinates of the same point, the rotation of the projection, the height of the perspective point and the scale of the photo (calculated in pixels/km). The program reads the Global Mappers Ground Control Point (.GCP) file format as input and creates projection description files (.PRJ) for the same software. The initial values of the geographical coordinates of the projection centre are calculated as the average of the control points, while the other parameters are set to experimental values which represent the most common circumstances of taking a globe photograph. The algorithm runs until the change of the parameters sinks below a pre-defined limit. The minimum search can be refined by using the previous result parameter set as new initial values. This paper introduces the calculation mechanism and examples of the usage. Other possible other usages of the method are also discussed.

  17. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.

  18. MD-11 PCA - Research flight team egress

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This McDonnell Douglas MD-11 has parked on the flightline at NASA's Dryden Flight Research Center, Edwards, California, following its completion of the first and second landings ever performed by a transport aircraft under engine power only (on Aug. 29, 1995). The milestone flight, with NASA research pilot and former astronaut Gordon Fullerton at the controls, was part of a NASA project to develop a computer-assisted engine control system that enables a pilot to land a plane safely when its normal control surfaces are disabled. Coming down the steps from the aircraft are Gordon Fullerton (in front), followed by Bill Burcham, Propulsion Controlled Aircraft (PCA) project engineer at Dryden; NASA Dryden controls engineer John Burken; John Feather of McDonnell Douglas; and Drew Pappas, McDonnell Douglas' project manager for PCA.

  19. Multirate Flutter Suppression System Design for the Benchmark Active Controls Technology Wing. Part 2; Methodology Application Software Toolbox

    NASA Technical Reports Server (NTRS)

    Mason, Gregory S.; Berg, Martin C.; Mukhopadhyay, Vivek

    2002-01-01

    To study the effectiveness of various control system design methodologies, the NASA Langley Research Center initiated the Benchmark Active Controls Project. In this project, the various methodologies were applied to design a flutter suppression system for the Benchmark Active Controls Technology (BACT) Wing. This report describes the user's manual and software toolbox developed at the University of Washington to design a multirate flutter suppression control law for the BACT wing.

  20. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  1. Systems Engineering and Reusable Avionics

    NASA Technical Reports Server (NTRS)

    Conrad, James M.; Murphy, Gloria

    2010-01-01

    One concept for future space flights is to construct building blocks for a wide variety of avionics systems. Once a unit has served its original purpose, it can be removed from the original vehicle and reused in a similar or dissimilar function, depending on the function blocks the unit contains. For example: Once a lunar lander has reached the moon's surface, an engine controller for the Lunar Decent Module would be removed and used for a lunar rover motor control unit or for a Environmental Control Unit for a Lunar Habitat. This senior design project included the investigation of a wide range of functions of space vehicles and possible uses. Specifically, this includes: (1) Determining and specifying the basic functioning blocks of space vehicles. (2) Building and demonstrating a concept model. (3) Showing high reliability is maintained. The specific implementation of this senior design project included a large project team made up of Systems, Electrical, Computer, and Mechanical Engineers/Technologists. The efforts were made up of several sub-groups that each worked on a part of the entire project. The large size and complexity made this project one of the more difficult to manage and advise. Typical projects only have 3-4 students, but this project had 10 students from five different disciplines. This paper describes the difference of this large project compared to typical projects, and the challenges encountered. It also describes how the systems engineering approach was successfully implemented so that the students were able to meet nearly all of the project requirements.

  2. 76 FR 39091 - San Luis Obispo Flood Control and Water Conservation District; Notice of Effectiveness of Surrender

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... Water Treatment Plant Hydropower Generation Unit Project No. 4804. The project was located on the county's water distribution system in San Luis Obispo County, California. \\1\\ San Luis Obispo Flood Control...

  3. Evaluation of modified work zone traffic control devices at business accesses

    DOT National Transportation Integrated Search

    2001-01-01

    Modified work zone traffic control devices at business accesses were evaluated on two Oregon Department of Transportation (ODOT) projects in 1999 and 2000. On one section project, blue Temporary Business Access" signs were used at business accesses d...

  4. Distributed Planning and Control for Teams of Cooperating Mobile Robots

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, L.E.

    2004-06-15

    This CRADA project involved the cooperative research of investigators in ORNL's Center for Engineering Science Advanced Research (CESAR) with researchers at Caterpillar, Inc. The subject of the research was the development of cooperative control strategies for autonomous vehicles performing applications of interest to Caterpillar customers. The project involved three Phases of research, conducted over the time period of November 1998 through December 2001. This project led to the successful development of several technologies and demonstrations in realistic simulation that illustrated the effectiveness of the control approaches for distributed planning and cooperation in multi-robot teams.

  5. ERIP Project No. 670, Nevada Energy Control Systems, Inc.. Final techincal progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimber, D.J.

    1998-02-11

    In order to gauge the effectiveness of the ERIP Project No. 670, Nevada Energy Control Systems, Inc., Grant Number DE-FG01-96EE15670, the Statement of Work must be compared to the achievements by NECSI during the grant period. The following report reflects the aforementioned statement and is coordinated directly with it. The project goal is to gather data and test in order to validate earlier tests of energy savings,safety,reliability and practicality of the NECSI Evaporator Fan Controller in order to fully commercialize and market the product.

  6. Inverting the Pendulum Using Fuzzy Control (Center Director's Discretionary Fund (Project 93-02)

    NASA Technical Reports Server (NTRS)

    Kissel, R. R.; Sutherland, W. T.

    1997-01-01

    A single pendulum was simulated in software and then built on a rotary base. A fuzzy controller was used to show its advantages as a nonlinear controller since bringing the pendulum inverted is extremely nonlinear. The controller was implemented in a Motorola 6811 microcontroller. A double pendulum was simulated and fuzzy control was used to hold it in a vertical position. The double pendulum was not built into hardware for lack of time. This project was for training and to show advantages of fuzzy control.

  7. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    Hanks, G. W.; Shomber, H. A.; Dethman, H. A.; Gratzer, L. B.; Maeshiro, A.; Gangsaas, D.; Blight, J. D.; Buchan, S. M.; Crumb, C. B.; Dorwart, R. J.

    1981-01-01

    The current status of the Active Controls Technology (ACT) for the advanced subsonic transport project is investigated through analysis of the systems technical data. Control systems technologies under examination include computerized reliability analysis, pitch axis fly by wire actuator, flaperon actuation system design trade study, control law synthesis and analysis, flutter mode control and gust load alleviation analysis, and implementation of alternative ACT systems. Extensive analysis of the computer techniques involved in each system is included.

  8. Improving water quality through California's Clean Beach Initiative: an assessment of 17 projects.

    PubMed

    Dorsey, John H

    2010-07-01

    California's Clean Beach Initiative (CBI) funds projects to reduce loads of fecal indicator bacteria (FIB) impacting beaches, thus providing an opportunity to judge the effectiveness of various CBI water pollution control strategies. Seventeen initial projects were selected for assessment to determine their effectiveness on reducing FIB in the receiving waters along beaches nearest to the projects. Control strategies included low-flow diversions, sterilization facilities, sewer improvements, pier best management practices (BMPs), vegetative swales, and enclosed beach BMPs. Assessments were based on statistical changes in pre- and postproject mean densities of FIB at shoreline monitoring stations targeted by the projects. Most low-flow diversions and the wetland swale project were effective in removing all contaminated runoff from beaches. UV sterilization was effective when coupled with pretreatment filtration and where effluent was released within a few hundred meters of the beach to avoid FIB regrowth. Other BMPs were less effective because they treated only a portion of contaminant sources impacting their target beach. These findings should be useful to other coastal states and agencies faced with similar pollution control problems.

  9. Customizing graphical user interface technology for spacecraft control centers

    NASA Technical Reports Server (NTRS)

    Beach, Edward; Giancola, Peter; Gibson, Steven; Mahmot, Ronald

    1993-01-01

    The Transportable Payload Operations Control Center (TPOCC) project is applying the latest in graphical user interface technology to the spacecraft control center environment. This project of the Mission Operations Division's (MOD) Control Center Systems Branch (CCSB) at NASA Goddard Space Flight Center (GSFC) has developed an architecture for control centers which makes use of a distributed processing approach and the latest in Unix workstation technology. The TPOCC project is committed to following industry standards and using commercial off-the-shelf (COTS) hardware and software components wherever possible to reduce development costs and to improve operational support. TPOCC's most successful use of commercial software products and standards has been in the development of its graphical user interface. This paper describes TPOCC's successful use and customization of four separate layers of commercial software products to create a flexible and powerful user interface that is uniquely suited to spacecraft monitoring and control.

  10. Mobile Learning Projects--A Critical Analysis of the State of the Art

    ERIC Educational Resources Information Center

    Frohberg, D.; Goth, C.; Schwabe, G.

    2009-01-01

    This paper provides a critical analysis of Mobile Learning projects published before the end of 2007. The review uses a Mobile Learning framework to evaluate and categorize 102 Mobile Learning projects, and to briefly introduce exemplary projects for each category. All projects were analysed with the criteria: context, tools, control,…

  11. Examining the Dynamics of Managing Information Systems Development Projects: A Control Loss Perspective

    ERIC Educational Resources Information Center

    Narayanaswamy, Ravi

    2009-01-01

    The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…

  12. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  13. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  14. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  15. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  16. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  17. Converging Redundant Sensor Network Information for Improved Building Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale Tiller; D. Phil; Gregor Henze

    2007-09-30

    This project investigated the development and application of sensor networks to enhance building energy management and security. Commercial, industrial and residential buildings often incorporate systems used to determine occupancy, but current sensor technology and control algorithms limit the effectiveness of these systems. For example, most of these systems rely on single monitoring points to detect occupancy, when more than one monitoring point could improve system performance. Phase I of the project focused on instrumentation and data collection. During the initial project phase, a new occupancy detection system was developed, commissioned and installed in a sample of private offices and open-planmore » office workstations. Data acquisition systems were developed and deployed to collect data on space occupancy profiles. Phase II of the project demonstrated that a network of several sensors provides a more accurate measure of occupancy than is possible using systems based on single monitoring points. This phase also established that analysis algorithms could be applied to the sensor network data stream to improve the accuracy of system performance in energy management and security applications. In Phase III of the project, the sensor network from Phase I was complemented by a control strategy developed based on the results from the first two project phases: this controller was implemented in a small sample of work areas, and applied to lighting control. Two additional technologies were developed in the course of completing the project. A prototype web-based display that portrays the current status of each detector in a sensor network monitoring building occupancy was designed and implemented. A new capability that enables occupancy sensors in a sensor network to dynamically set the 'time delay' interval based on ongoing occupant behavior in the space was also designed and implemented.« less

  18. Measurement of Software Project Management Effectiveness

    DTIC Science & Technology

    2008-12-01

    with technical, financial, policy, and non -technical concerns of stakeholders, to develop and select suitable risk control actions, and implementation...not intervene in their projects and therefore affect their views. In most research experiments, researchers apply a controlled event, method or...enable a consistency check among the responses and for other research purposes. Therefore, for the risk control area model, only the responses from

  19. Distributing Planning and Control for Teams of Cooperating Mobile Robots

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, L.E.

    2004-07-19

    This CRADA project involved the cooperative research of investigators in ORNL's Center for Engineering Science Advanced Research (CESAR) with researchers at Caterpillar, Inc. The subject of the research was the development of cooperative control strategies for autonomous vehicles performing applications of interest to Caterpillar customers. The project involved three Phases of research, conducted over the time period of November 1998 through December 2001. This project led to the successful development of several technologies and demonstrations in realistic simulation that illustrated the effectiveness of our control approaches for distributed planning and cooperation in multi-robot teams. The primary objectives of this researchmore » project were to: (1) Develop autonomous control technologies to enable multiple vehicles to work together cooperatively, (2) Provide the foundational capabilities for a human operator to exercise oversight and guidance during the multi-vehicle task execution, and (3) Integrate these capabilities to the ALLIANCE-based autonomous control approach for multi-robot teams. These objectives have been successfully met with the results implemented and demonstrated in a near real-time multi-vehicle simulation of up to four vehicles performing mission-relevant tasks.« less

  20. 10 CFR 609.6 - Submission of Applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... checklist for the equity and debt to the extent available; (16) Applicant's business plan on which the project is based and Applicant's financial model presenting project pro forma statements for the proposed... backing, together with business and financial interests of controlling or commonly controlled...

  1. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  2. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  3. Early strength prediction of concrete based on accelerated curing methods : final report.

    DOT National Transportation Integrated Search

    1995-12-01

    Concrete mix designs and components may currently be changed during the course of a project. The possible negative effects of such changes on concrete strength, are not determined under the current plant control/project control process. Also, the cur...

  4. China Report, Economic Affairs

    DTIC Science & Technology

    1986-04-23

    uniformity" otherwise the scope control will not be effective. If we want to strengthen macroeconomic control and to stimulate the microeconomy ...management results of microeconomy . They blindly pursue the starting of projects but fail to consider or assume responsibility for the "ending" of projects

  5. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  6. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  7. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  8. Feed-forward and feedback projections of midbrain reticular formation neurons in the cat

    PubMed Central

    Perkins, Eddie; May, Paul J.; Warren, Susan

    2014-01-01

    Gaze changes involving the eyes and head are orchestrated by brainstem gaze centers found within the superior colliculus (SC), paramedian pontine reticular formation (PPRF), and medullary reticular formation (MdRF). The mesencephalic reticular formation (MRF) also plays a role in gaze. It receives a major input from the ipsilateral SC and contains cells that fire in relation to gaze changes. Moreover, it provides a feedback projection to the SC and feed-forward projections to the PPRF and MdRF. We sought to determine whether these MRF feedback and feed-forward projections originate from the same or different neuronal populations by utilizing paired fluorescent retrograde tracers in cats. Specifically, we tested: 1. whether MRF neurons that control eye movements form a single population by injecting the SC and PPRF with different tracers, and 2. whether MRF neurons that control head movements form a single population by injecting the SC and MdRF with different tracers. In neither case were double labeled neurons observed, indicating that feedback and feed-forward projections originate from separate MRF populations. In both cases, the labeled reticulotectal and reticuloreticular neurons were distributed bilaterally in the MRF. However, neurons projecting to the MdRF were generally constrained to the medial half of the MRF, while those projecting to the PPRF, like MRF reticulotectal neurons, were spread throughout the mediolateral axis. Thus, the medial MRF may be specialized for control of head movements, with control of eye movements being more widespread in this structure. PMID:24454280

  9. Feed-forward and feedback projections of midbrain reticular formation neurons in the cat.

    PubMed

    Perkins, Eddie; May, Paul J; Warren, Susan

    2014-01-10

    Gaze changes involving the eyes and head are orchestrated by brainstem gaze centers found within the superior colliculus (SC), paramedian pontine reticular formation (PPRF), and medullary reticular formation (MdRF). The mesencephalic reticular formation (MRF) also plays a role in gaze. It receives a major input from the ipsilateral SC and contains cells that fire in relation to gaze changes. Moreover, it provides a feedback projection to the SC and feed-forward projections to the PPRF and MdRF. We sought to determine whether these MRF feedback and feed-forward projections originate from the same or different neuronal populations by utilizing paired fluorescent retrograde tracers in cats. Specifically, we tested: 1. whether MRF neurons that control eye movements form a single population by injecting the SC and PPRF with different tracers, and 2. whether MRF neurons that control head movements form a single population by injecting the SC and MdRF with different tracers. In neither case were double labeled neurons observed, indicating that feedback and feed-forward projections originate from separate MRF populations. In both cases, the labeled reticulotectal and reticuloreticular neurons were distributed bilaterally in the MRF. However, neurons projecting to the MdRF were generally constrained to the medial half of the MRF, while those projecting to the PPRF, like MRF reticulotectal neurons, were spread throughout the mediolateral axis. Thus, the medial MRF may be specialized for control of head movements, with control of eye movements being more widespread in this structure.

  10. Schistosomiasis control in China: the impact of a 10-year World Bank Loan Project (1992-2001).

    PubMed Central

    Xianyi, Chen; Liying, Wang; Jiming, Cai; Xiaonong, Zhou; Jiang, Zheng; Jiagang, Guo; Xiaohua, Wu; Engels, D.; Minggang, Chen

    2005-01-01

    China has been carrying out large-scale schistosomiasis control since the mid-1950s, but in the early 1990s, schistosomiasis was still endemic in eight provinces. A World Bank Loan Project enabled further significant progress to be made during the period 1992-2001. The control strategy was focused on the large-scale use of chemotherapy -- primarily to reinforce morbidity control -- while at the same time acting on transmission with the ultimate goal of interrupting it. Chemotherapy was complemented by health education, chemical control of snails and environmental modification where appropriate. A final evaluation in 2002 showed that infection rates in humans and livestock had decreased by 55% and 50%, respectively. The number of acute infections and of individuals with advanced disease had also significantly decreased. Although snail infection rates continued to fluctuate at a low level, the densities of infected snails had decreased by more than 75% in all endemic areas. The original objectives of the China World Bank Loan Project for schistosomiasis control had all been met. One province, Zhejiang, had already fulfilled the criteria for elimination of schistosomiasis by 1995. The project was therefore a success and has provided China with a sound basis for further control. PMID:15682248

  11. Cryogenic ribbon-cutting

    NASA Image and Video Library

    2011-03-30

    NASA cut the ribbon on a new cryogenics control center at John C. Stennis Space Center on March 30. The new facility is part of a project to strengthen Stennis facilities to withstand the impacts of future storms like hurricane Katrina in 2005. Participants in the ribbon-cutting included (l to r): Jason Zuckerman, director of project management for The McDonnel Group; Keith Brock, director of the NASA Project Directorate at Stennis; Stennis Deputy Director Rick Gilbrech; Steve Jackson, outgoing program manager of the Jacobs Technology NASA Test Operations Group; and Troy Frisbie, Cryo Control Center Construction project manager for NASA Center Operations at Stennis.

  12. ESO Demonstration Project with the NRAO 12-m Antenna

    NASA Astrophysics Data System (ADS)

    Heald, R.; Karban, R.

    2000-03-01

    During the months of September through November 1999, an ALMA joint demonstration project between the European Southern Observatory (ESO) and the National Radio Astronomy Observatory (NRAO) was carried out in Socorro/New Mexico. During this period, Robert Karban (ESO) and Ron Heald (NRAO) worked together on the ESO Demonstration Project. The project integrated ESO software and existing NRAO software (a prototype for the future ALMA control software) to control the motion of the Kitt Peak 12-m antenna. ESO software from the VLT provided the operator interface and coordinate transformation software, while Pat Wallace's TPOINT provided the pointing- model software.

  13. The integrated project: a promising promotional strategy for primary health care.

    PubMed

    Daniel, C; Mora, B

    1985-10-01

    The integrated project using parasite control and nutrition as entry points for family planning practice has shown considerable success in promoting health consciousness among health workers and project beneficiaries. This progress is evident in the Family Planning, Parasite Control and Nutrition (FAPPCAN) areas. The project has also mobilized technical and financial support from the local government as well as from private and civic organizations. The need for integration is underscored by the following considerations: parasite control has proved to be effective for preventive health care; the integrated project uses indigenous community health workers to accomplish its objectives; the primary health care (PHC) movement depends primarily on voluntary community participation and the integrated project has shown that it can elicit this participation. The major health problems in the Philippines are: a prevalence of communicable and other infectious diseases; poor evironmental sanitation; malnutrition; and a rapid population growth rate. The integrated program utilizes the existing village health workers in identifying problems related to family planning, parasite control and nutrition and integrates these activities into the health delivery system; educates family members on how to detect health and health-related problems; works out linkages with government agencies and the local primary health care committee in defining the scope of health-related problems; mobilizes community members to initiate their own projects; gets the commitment of village officials and committe members. The integrated project operates within the PHC. A health van with a built-in video playback system provides educational and logistical support to the village worker. The primary detection and treatment of health problems are part of the village health workers' responsibilities. Research determines the project's capability to reactivate the village primary health care committees and sustain community commitment. The project initially covered 4 villages. Implementation problems included: inactive village health workers, inadequate supervision and monitoring of PHC, a lack of commitment of committee members, and the lack of financial support.

  14. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wade, F. E.

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for themore » chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.« less

  15. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  16. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  17. 24 CFR 891.185 - Preemption of rent control laws.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... necessary and desirable to assist project owners to preserve the continued viability of each project... economic interest of the Federal Government in those projects. Therefore, the Department concludes that it...

  18. 24 CFR 891.185 - Preemption of rent control laws.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... necessary and desirable to assist project owners to preserve the continued viability of each project... economic interest of the Federal Government in those projects. Therefore, the Department concludes that it...

  19. 24 CFR 891.185 - Preemption of rent control laws.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... necessary and desirable to assist project owners to preserve the continued viability of each project... economic interest of the Federal Government in those projects. Therefore, the Department concludes that it...

  20. 24 CFR 891.185 - Preemption of rent control laws.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... necessary and desirable to assist project owners to preserve the continued viability of each project... economic interest of the Federal Government in those projects. Therefore, the Department concludes that it...

  1. 24 CFR 891.185 - Preemption of rent control laws.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... necessary and desirable to assist project owners to preserve the continued viability of each project... economic interest of the Federal Government in those projects. Therefore, the Department concludes that it...

  2. Technology for On-Chip Qubit Control with Microfabricated Surface Ion Traps

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Highstrete, Clark; Scott, Sean Michael; Nordquist, Christopher D.

    2013-11-01

    Trapped atomic ions are a leading physical system for quantum information processing. However, scalability and operational fidelity remain limiting technical issues often associated with optical qubit control. One promising approach is to develop on-chip microwave electronic control of ion qubits based on the atomic hyperfine interaction. This project developed expertise and capabilities at Sandia toward on-chip electronic qubit control in a scalable architecture. The project developed a foundation of laboratory capabilities, including trapping the 171Yb + hyperfine ion qubit and developing an experimental microwave coherent control capability. Additionally, the project investigated the integration of microwave device elements with surface ionmore » traps utilizing Sandia’s state-of-the-art MEMS microfabrication processing. This effort culminated in a device design for a multi-purpose ion trap experimental platform for investigating on-chip microwave qubit control, laying the groundwork for further funded R&D to develop on-chip microwave qubit control in an architecture that is suitable to engineering development.« less

  3. Automatization Project for the Carl-Zeiss-Jena Coudè Telescope of the Simón Bolívar Planetarium I. The Electro-Mechanic System

    NASA Astrophysics Data System (ADS)

    Núñez, A.; Maharaj, A.; Muñoz, A. G.

    2009-05-01

    The ``Complejo Científico, Cultural y Turístico Simón Bolívar'' (CCCTSB), located in Maracaibo, Venezuela, lodges the Simón Bolívar Planetarium and an 150 mm aperture, 2250 mm focal length Carl-Zeiss-Jena Coudè refractor telescope. In this work we discuss the schematics for the automatization project of this Telescope, the planned improvements, methodology, engines, micro-controllers, interfaces and the uptodate status of the project. This project is working on the first two levels of the automation pyramid, the sensor -- actuator level and the control or Plant floor level. The Process control level correspond to the software related section. This mean that this project work immediately with the electrical, electronic and mechanical stuffs, and with the assembler micro controller language. All the pc related stuff, like GUI (Graphic user interfaces), remote control, Grid database, and others, correspond to the next two automation pyramid levels. The idea is that little human intervention will be required to manipulate the telescope, only giving a pair of coordinates to ubicate and follow an object on the sky. A set of three servomotors, coupling it with the telescope with a gear box, are going to manipulate right ascension, declination and focus movement. For the dome rotation, a three phase induction motor will be used. For dome aperture/closure it is suggested a DC motor powered with solar panels. All those actuators are controlled by a 8 bits micro-controller, which receive the coordinate imput, the signal from the position sensors and have the PID control algorithm. This algorithm is tuned based on the mathematical model of the telescope electro-mechanical instrumentation.

  4. Operational research on malaria control and elimination: a review of projects published between 2008 and 2013.

    PubMed

    Zhou, Shui-sen; Rietveld, Aafje E C; Velarde-Rodriguez, Mar; Ramsay, Andrew R; Zhang, Shao-sen; Zhou, Xiao-nong; Cibulskis, Richard E

    2014-12-04

    A literature review for operational research on malaria control and elimination was conducted using the term 'malaria' and the definition of operational research (OR). A total of 15 886 articles related to malaria were searched between January 2008 and June 2013. Of these, 582 (3.7%) met the definition of operational research. These OR projects had been carried out in 83 different countries. Most OR studies (77%) were implemented in Africa south of the Sahara. Only 5 (1%) of the OR studies were implemented in countries in the pre-elimination or elimination phase. The vast majority of OR projects (92%) were led by international or local research institutions, while projects led by National Malaria Control Programmes (NMCP) accounted for 7.8%. With regards to the topic under investigation, the largest percentage of papers was related to vector control (25%), followed by epidemiology/transmission (16.5%) and treatment (16.3%). Only 19 (3.8%) of the OR projects were related to malaria surveillance. Strengthening the capacity of NMCPs to conduct operational research and publish its findings, and improving linkages between NMCPs and research institutes may aid progress towards malaria elimination and eventual eradication world-wide.

  5. An invisible benefit: integrated project on family planning and parasite control has expanded operations multi-dimensionally.

    PubMed

    Taniguchi, H

    1985-11-01

    Resolutions adopted by the 12th Annual Asian Parasite Control/Family Planning (APCO/FP) Conference held in Colombo, Sri Lanka urge the incorporation of quality of life issues of all dimensions in projects of all participating countries. 1 study discussed during the conference concerned health volunteers of the integrated project in Sri Lanka, which analyzes motivating factors which make community young people work on a voluntary basis. Another topic covered was the role of women in the achievement of primary health care. Video reports were presented by Bangladesh on family planning and parasite control activities, Brazil on utilization of existing organizations to improve successful integrated projects, China on making twin concerns of family planning and primary health care, Indonesia on strengthening urban FP/MCH clinics, Korea on health promotion through the integrated project, Malaysia on the NADI program, the Philippines on the Cebu model of integrated health care, and Thailand on fee charging urban programs.

  6. An intelligent automated command and control system for spacecraft mission operations

    NASA Technical Reports Server (NTRS)

    Stoffel, A. William

    1994-01-01

    The Intelligent Command and Control (ICC) System research project is intended to provide the technology base necessary for producing an intelligent automated command and control (C&C) system capable of performing all the ground control C&C functions currently performed by Mission Operations Center (MOC) project Flight Operations Team (FOT). The ICC research accomplishments to date, details of the ICC, and the planned outcome of the ICC research, mentioned above, are discussed in detail.

  7. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  8. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  9. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  10. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  11. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  12. 33 CFR 274.4 - Pesticide management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Pesticide management. 274.4... DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.4 Pesticide management. (a... control management personnel prior to advertisement of the contract and procurement of services. The...

  13. 33 CFR 274.4 - Pesticide management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Pesticide management. 274.4... DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.4 Pesticide management. (a... control management personnel prior to advertisement of the contract and procurement of services. The...

  14. 33 CFR 274.4 - Pesticide management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Pesticide management. 274.4... DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.4 Pesticide management. (a... control management personnel prior to advertisement of the contract and procurement of services. The...

  15. Second generation heliostat development for solar central receiver systems. Volume 4, appendices F-J: Control software test results manufacturing pile installation pile coatings

    NASA Astrophysics Data System (ADS)

    1981-03-01

    Support documentation for a second generation heliostat project is presented. Flowcharts of control software are included. Numerical and graphic test results are provided. Project management information is also provided.

  16. 33 CFR 274.4 - Pesticide management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pesticide management. 274.4... DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.4 Pesticide management. (a... control management personnel prior to advertisement of the contract and procurement of services. The...

  17. Revision 2 of the Enbridge Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This Quality Assurance Project Plan (QAPP) presents Revision 2 of the organization, objectives, planned activities, and specific quality assurance/quality control (QA/QC) procedures associated with the Enbridge Marshall Pipeline Release Project.

  18. Preliminary design study of advanced composite blade and hub and nonmechanical control system for the tilt-rotor aircraft. Volume 2: Project planning data

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.

  19. Network models for solving the problem of multicriterial adaptive optimization of investment projects control with several acceptable technologies

    NASA Astrophysics Data System (ADS)

    Shorikov, A. F.; Butsenko, E. V.

    2017-10-01

    This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.

  20. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  1. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  2. Do transportation subsidies and living allowances improve tuberculosis control outcomes among internal migrants in urban Shanghai, China?

    PubMed

    Lu, Hui; Yan, Fei; Wang, Wei; Wu, Laiwa; Ma, Weiping; Chen, Jing; Shen, Xin; Mei, Jian

    2013-01-01

    Tuberculosis (TB) in internal migrants is one of three threats for TB control in China. To address this threat, a project was launched in eight of the 19 districts of Shanghai in 2007 to provide transportation subsidies and living allowances for all migrant TB cases. This study aims to determine if this project contributed to improved TB control outcomes among migrants in urban Shanghai. This was a community intervention study. The data were derived from the TB Management Information System in three project districts and three non-project districts in Shanghai between 2006 and 2010. The impact of the project was estimated in a difference-in-difference (DID) analysis framework, and a multivariable binary logistic regression analysis. A total of 1872 pulmonary TB (PTB) cases in internal migrants were included in the study. The treatment success rate (TSR) for migrant smear-positive cases in project districts increased from 59.9% in 2006 to 87.6% in 2010 (P < 0.001). The crude DID improvement of TSR was 18.9%. There was an increased probability of TSR in the project group before and after the project intervention period (coefficient = 1.156, odds ratio = 3.178, 95% confidence interval: 1.305-7.736, P = 0.011). The study showed the project could improve treatment success in migrant PTB cases. This was a short-term programme using special financial subsidies for all migrant PTB cases. It is recommended that project funds be continuously invested by governments with particular focus on the more vulnerable PTB cases among migrants.

  3. Enhancement of students’ creative thinking skills on mixture separation topic using project based student worksheet

    NASA Astrophysics Data System (ADS)

    Nurisalfah, R.; Fadiawati, N.; Jalmo, T.

    2018-05-01

    The aim of this study is to describe the effectiveness of project based student worksheet in improving students' creative thinking skills. The research method is using quasi experiment with the matching only pre-test post-test control group design. The population in this research is all students of class VII SMP N 2 Belitang Madang Raya with class VII1 as control class and class VII4 as experiment class. The sample of this research is obtaining by purposive sampling technique. The effectiveness of project based student worksheet is based on significant post-test differences between the control class and the experiment class as well as the effect size. The results show that the using of project based student worksheet is effective in improving students' creative thinking skills on mixture separation topic.

  4. INcreasing Security and Protection through Infrastructure REsilience: The INSPIRE Project

    NASA Astrophysics Data System (ADS)

    D'Antonio, Salvatore; Romano, Luigi; Khelil, Abdelmajid; Suri, Neeraj

    The INSPIRE project aims at enhancing the European potential in the field of security by ensuring the protection of critical information infrastructures through (a) the identification of their vulnerabilities and (b) the development of innovative techniques for securing networked process control systems. To increase the resilience of such systems INSPIRE will develop traffic engineering algorithms, diagnostic processes and self-reconfigurable architectures along with recovery techniques. Hence, the core idea of the INSPIRE project is to protect critical information infrastructures by appropriately configuring, managing, and securing the communication network which interconnects the distributed control systems. A working prototype will be implemented as a final demonstrator of selected scenarios. Controls/Communication Experts will support project partners in the validation and demonstration activities. INSPIRE will also contribute to standardization process in order to foster multi-operator interoperability and coordinated strategies for securing lifeline systems.

  5. 24 CFR 945.103 - General policies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... will not be housed in a designated project, PHAs shall utilize housing resources that they own, control... utilize, to the extent practicable, any housing facilities that they own or control in which supportive... housing, group homes, and congregate housing. (3) Exemption of mixed population projects. A PHA with a...

  6. 24 CFR 945.103 - General policies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... will not be housed in a designated project, PHAs shall utilize housing resources that they own, control... utilize, to the extent practicable, any housing facilities that they own or control in which supportive... housing, group homes, and congregate housing. (3) Exemption of mixed population projects. A PHA with a...

  7. 24 CFR 945.103 - General policies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... will not be housed in a designated project, PHAs shall utilize housing resources that they own, control... utilize, to the extent practicable, any housing facilities that they own or control in which supportive... housing, group homes, and congregate housing. (3) Exemption of mixed population projects. A PHA with a...

  8. 24 CFR 945.103 - General policies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... will not be housed in a designated project, PHAs shall utilize housing resources that they own, control... utilize, to the extent practicable, any housing facilities that they own or control in which supportive... housing, group homes, and congregate housing. (3) Exemption of mixed population projects. A PHA with a...

  9. 24 CFR 945.103 - General policies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... will not be housed in a designated project, PHAs shall utilize housing resources that they own, control... utilize, to the extent practicable, any housing facilities that they own or control in which supportive... housing, group homes, and congregate housing. (3) Exemption of mixed population projects. A PHA with a...

  10. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  11. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  12. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  13. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  14. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  15. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  16. Psychological characteristics of eating disorders as evidenced by the combined administration of questionnaires and two projective methods: the Tree Drawing Test (Baum Test) and the Sentence Completion Test.

    PubMed

    Mizuta, Ichiro; Inoue, Yoichi; Fukunaga, Tomoko; Ishi, Ryohei; Ogawa, Asao; Takeda, Masatoshi

    2002-02-01

    The objective of this study is to examine psychological/psychopathological characteristics of eating disorders and their subtypes through a combined administration of questionnaires and projective tests. Three questionnaires (Eating Disorder Inventory - 2, Social Adaptation Scale, Southern California University Eating Disorder Inventory - Revised) and two projective tests (the Tree Drawing Test [TDT, Baum Test], and the Sentence Completion Test [SCT]) were administered to 126 female patients between the ages of 15 and 30 years, with eating disorders according to DSM-IV criteria at our outpatient clinic, and to 54 sex- and age-matched control subjects. The purging subtypes of eating disorders (anorexia nervosa - binge-eating/purging type [ANBP] and bulimia nervosa - purging type [BNP]) were clearly differentiated from the controls, both by the questionnaires and the projective tests. Compared with the controls, ANBP/BNP showed more problematic profiles across the three questionnaires, drew smaller and poorer trees in TDT to a more left location on the drawing paper, and gave fewer positive, and more negative responses in SCT. In contrast, few significant differences were found between anorexia nervosa- restricting type (ANR) and the controls, and between ANBP and BNP. As a trend, however, ANR was consistently located between the controls and ANBP/BNP across the whole questionnaires and projective tests.

  17. SDN Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustainmore » critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information technology and operational technology engineers, to be the ones centrally administering the technology and responding to events; Simplifies network configuration, improving deterministic Ethernet transport times, and providing instant visualization on where the communication circuits are and how all circuits are impacted when changes (e.g., configuration changes, failures or intrusions) happen, allowing operators to minimize downtime; and Improves the ability to identify deviations in network behavior resulting in detection and analysis of potential cyber intrusions and faster response times Results: This project has forever changed the way critical infrastructure networks are designed, secured, deployed and maintained. The cybersecurity and performance advantages achieved are significant, simply put traditional networking has been obsoleted while the team maintained Ethernet interoperability avoiding any legacy concerns. The team commercially released technology that accomplished all the cybersecurity goals outlined in the SOPO and completed it by executing the project management plan approved in the initial contract. The resulting Energy sector SDN flow controller model number is SEL-5056 and can be freely downloaded from the www.SELinc.com website. This technology not only improves the cybersecurity of control systems but has measured results that it improves the performance and reliability of the control system as well. This means the system owners can confidently apply it to their systems knowing that it will, “first do no harm” but actually improve the system as well. Success of the project is best measured by the sales and deployment of the technology. System owners in industrial, electric, defense, and oil and gas only months after commercial release have approved plans for deployment.« less

  18. Manufacturing Methods and Technology Project Summary Reports

    DTIC Science & Technology

    1985-06-01

    Computer -Aided Design (CAD)/ Computer -Aided Manufacturing (CAM) Process for the Production of Cold Forged Gears Project 483 6121 - Robotic Welding and...Caliber Projectile Bodies Project 682 8370 - Automatic Inspection and 1-I1 Process Control of Weapons Parts Manufacturing METALS Project 181 7285 - Cast...designed for use on each project. Experience suggested that a general purpose computer interface might be designed that could be used on any project

  19. 30 CFR 880.11 - Qualifications of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ABANDONED MINE LAND RECLAMATION MINE FIRE CONTROL § 880.11 Qualifications of projects. The purpose of all projects is to prevent injury and loss of life, protect public health, conserve natural resources, or... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Qualifications of projects. 880.11 Section 880...

  20. Riparian and Related Values Associated with Flood Control Project Alternatives at Wildcat and San Pablo Creeks

    Treesearch

    Philip A. Meyer

    1989-01-01

    This analysis will consider Riparian benefits from alternative project designs at Wildcat and San Pablo Creeks. Particular emphasis will be placed on quantification of riparian values and on the relationship of projects benefits for each project alternative to estimated costs of implementation.

  1. 75 FR 4567 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... technology. Written comments should be received within 60 days of this notice. Proposed Project Minority HIV... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  2. 75 FR 67375 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... information technology. Written comments should be received within 60 days of this notice. Proposed Project... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  3. 75 FR 61762 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... technology. Written comments should be received within 60 days of this notice. Proposed Project HIV/AIDS... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  4. 75 FR 8364 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... technology. Written comments should be received within 60 days of this notice. Proposed Project National... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  5. 75 FR 43984 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... technology. Written comments should be received within 60 days of this notice. Proposed Project National... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  6. 76 FR 6139 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... technology. Written comments should be received within 60 days of this notice. Proposed Project Community... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or...

  7. Katie Contos | NREL

    Science.gov Websites

    Katie Contos Photo of Katie Contos Katie Contos Project Controller Katie.Contos@nrel.gov | 303-384 -7386 Katie joined NREL in 2012. As a Project Administrator in the Integrated Applications Center, Katie works with a variety of project leaders and teams in project management, planning, implementation

  8. The Richmond Flight Project

    ERIC Educational Resources Information Center

    Journal of Aerospace Education, 1976

    1976-01-01

    Evaluation of a project that provided flight instruction to inner-city junior high school students showed that former project youths are demonstrably better off than controls in the areas of employment, avoidance of deviant behavior, and advanced education. (MLH)

  9. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  10. Biotelemetry system for Epilepsy Seizure Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, LaCurtise; Bohnert, George W.

    2009-07-02

    The Biotelemetry System for Epilepsy Seizure Control Project developed and tested an automated telemetry system for use in an epileptic seizure prevention device that precisely controls localized brain temperature. This project was a result of a Department of Energy (DOE) Global Initiatives for Proliferation Prevention (GIPP) grant to the Kansas City Plant (KCP), Argonne National Laboratory (ANL), and Pacific Northwest National Laboratory (PNNL) to partner with Flint Hills Scientific, LLC, Lawrence, KS and Biophysical Laboratory Ltd (BIOFIL), Sarov, Russia to develop a method to help control epileptic seizures.

  11. How to reduce workload--augmented reality to ease the work of air traffic controllers.

    PubMed

    Hofmann, Thomas; König, Christina; Bruder, Ralph; Bergner, Jörg

    2012-01-01

    In the future the air traffic will rise--the workload of the controllers will do the same. In the BMWi research project, one of the tasks is, how to ensure safe air traffic, and a reasonable workload for the air traffic controllers. In this project it was the goal to find ways how to reduce the workload (and stress) for the controllers to allow safe air traffic, esp. at huge hub-airports by implementing augmented reality visualization and interaction.

  12. Overview of Active Flow Control at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Pack, L. G.; Joslin, R. D.

    1998-01-01

    The paper summarizes Active Flow Control projects currently underway at the NASA Langley Research Center. Technology development is being pursued within a multidisciplinary, cooperative approach, involving the classical disciplines of fluid mechanics, structural mechanics, material science, acoustics, and stability and control theory. Complementing the companion papers in this session, the present paper will focus on projects that have the goal of extending the state-of-the-art in the measurement, prediction, and control of unsteady, nonlinear aerodynamics. Toward this goal, innovative actuators, micro and macro sensors, and control strategies are considered for high payoff flow control applications. The target payoffs are outlined within each section below. Validation of the approaches range from bench-top experiments to wind-tunnel experiments to flight tests. Obtaining correlations for future actuator and sensor designs are implicit in the discussion. The products of the demonstration projects and design tool development from the fundamental NASA R&D level technology will then be transferred to the Applied Research components within NASA, DOD, and US Industry. Keywords: active flow control, separation control, MEMS, review

  13. Advanced Guidance and Control Project for Reusable Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Hanson, John M.

    2000-01-01

    The goals of this project are to significantly reduce the time and cost associated with guidance and control design for reusable launch vehicles, and to increase their safety and reliability. Success will lead to reduced cycle times during vehicle design and to reduced costs associated with flying to new orbits, with new payloads, and with modified vehicles. Success will also lead to more robustness to unforeseen circumstances in flight thereby enhancing safety and reducing risk. There are many guidance and control methods available that hold some promise for improvement in the desired areas. Investigators are developing a representative set of independent guidance and control methods for this project. These methods are being incorporated into a high-fidelity off is being conducted across a broad range of flight requirements. The guidance and control methods that perform the best will have demonstrated the desired qualities.

  14. Stochastic modeling and control system designs of the NASA/MSFC Ground Facility for large space structures: The maximum entropy/optimal projection approach

    NASA Technical Reports Server (NTRS)

    Hsia, Wei-Shen

    1986-01-01

    In the Control Systems Division of the Systems Dynamics Laboratory of the NASA/MSFC, a Ground Facility (GF), in which the dynamics and control system concepts being considered for Large Space Structures (LSS) applications can be verified, was designed and built. One of the important aspects of the GF is to design an analytical model which will be as close to experimental data as possible so that a feasible control law can be generated. Using Hyland's Maximum Entropy/Optimal Projection Approach, a procedure was developed in which the maximum entropy principle is used for stochastic modeling and the optimal projection technique is used for a reduced-order dynamic compensator design for a high-order plant.

  15. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  16. DC motor speed control using fuzzy logic controller

    NASA Astrophysics Data System (ADS)

    Ismail, N. L.; Zakaria, K. A.; Nazar, N. S. Moh; Syaripuddin, M.; Mokhtar, A. S. N.; Thanakodi, S.

    2018-02-01

    The automatic control has played a vital role in the advance of engineering and science. Nowadays in industries, the control of direct current (DC) motor is a common practice thus the implementation of DC motor controller speed is important. The main purpose of motor speed control is to keep the rotation of the motor at the present speed and to drive a system at the demand speed. The main purpose of this project is to control speed of DC Series Wound Motor using Fuzzy Logic Controller (FLC). The expectation of this project is the Fuzzy Logic Controller will get the best performance compared to dc motor without controller in terms of settling time (Ts), rise time (Tr), peak time (Tp) and percent overshoot (%OS).

  17. Applications of industrial engineering. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Yarbrough, Walthea V.

    1992-01-01

    Two separate and distinctly different projects are described within this paper: the stepping motion bearing tester, and the memo search and find project. The objective of the first project was to program the JSI Digital Servo Controller to control the motor using the stepping pattern prescribed by the AMSU-U2 Scan Profile. The objective of the second project was to develop a dBASE 3 Plus program that would allow the user to gain the necessary information to retrieve the memo(s) being sought upon supplying a word or group of words possibly found in the keyword list or upon supplying the author's name.

  18. Assessment of pollution prevention and control technology for plating operations

    NASA Technical Reports Server (NTRS)

    Chalmer, Paul D.; Sonntag, William A.; Cushnie, George C., Jr.

    1995-01-01

    The National Center for Manufacturing Sciences (NCMS) is sponsoring an on-going project to assess pollution prevention and control technology available to the plating industry and to make this information available to those who can benefit from it. Completed project activities include extensive surveys of the plating industry and vendors of technologies and an indepth literature review. The plating industry survey was performed in cooperation with the National Association of Metal Finishers. The contractor that conducted the surveys and prepared the project products was CAI Engineering. The initial products of the project were made available in April, 1994. These products include an extensive report that presents the results of the surveys and literature review and an electronic database. The project results are useful for all those associated with pollution prevention and control in the plating industry. The results show which treatment, recovery and bath maintenance technologies have been most successful for different plating processes and the costs for purchasing and operating these technologies. The project results also cover trends in chemical substitution, the identification of compliance-problem pollutants, sludge generation rates, off-site sludge recovery and disposal options, and many other pertinent topics.

  19. 76 FR 55658 - Applications for New Awards; Supporting Effective Educator Development Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... defined in this notice), or other strategies. Definitions: Carefully matched comparison group design means... in the project (control group). The effect of the project is the average difference in outcomes between the treatment and control groups. High-need students means students at risk of educational failure...

  20. 75 FR 30410 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Provider...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ..., Disability, and Injury Prevention and Control Special Interest Project (SIP): Provider and Public Health... and Public Health Input for Vaccine Policy Decisions, SIP 10-036.'' Contact Person for More Information: Michelle Mathieson, Public Health Analyst, National Center for Chronic Disease and Health...

  1. 7 CFR 4280.108 - Project eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operation and maintenance. A third-party under contract to the owner may be used to control revenues and expenses and manage the operation and/or maintenance of the project. (f) Sites must be controlled by the... guarantees. (g) Satisfactory sources of revenue in an amount sufficient to provide for the operation...

  2. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Rehabilitation of Federal flood control projects. 203.85 Section 203.85 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER...

  3. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Rehabilitation of Federal flood control projects. 203.85 Section 203.85 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER...

  4. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Rehabilitation of Federal flood control projects. 203.85 Section 203.85 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER...

  5. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Rehabilitation of Federal flood control projects. 203.85 Section 203.85 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER...

  6. 33 CFR 203.85 - Rehabilitation of Federal flood control projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Rehabilitation of Federal flood control projects. 203.85 Section 203.85 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER...

  7. 15 CFR 760.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project financing by a United States bank located in the United States to a controlled foreign subsidiary... controlled foreign subsidiary's construction project in a third country are services passed through to the... boycotting country Y for computers. A places an order with U.S. company B for some of the components; with U...

  8. 15 CFR 760.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project financing by a United States bank located in the United States to a controlled foreign subsidiary... controlled foreign subsidiary's construction project in a third country are services passed through to the... boycotting country Y for computers. A places an order with U.S. company B for some of the components; with U...

  9. Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant. Office of Industrial Technologies (OIT) BestPractices Project Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2002-01-01

    This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

  10. Demonstration of Green/Gray Infrastructure for Combined Sewer Overflow Control

    EPA Science Inventory

    This project is a major national demonstration of the integration of green and gray infrastructure for combined sewer overflow (CSO) control in a cost-effective and environmentally friendly manner. It will use Kansas City, MO, as a case example. The project will have a major in...

  11. 78 FR 73559 - Renewal of Agency Information Collection for Reporting Systems for Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... Project authorized by OMB Control Number 1076-0135. This information collection expires December 31, 2013... Number 1076-0135, Reporting System for Indian Employment, Training, and Related Services Demonstration.... Data OMB Control Number: 1076-0135. Title: Reporting System for Public Law 102-477 Demonstration...

  12. 15 CFR 760.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project financing by a United States bank located in the United States to a controlled foreign subsidiary... controlled foreign subsidiary's construction project in a third country are services passed through to the... boycotting country Y for computers. A places an order with U.S. company B for some of the components; with U...

  13. 15 CFR 760.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project financing by a United States bank located in the United States to a controlled foreign subsidiary... controlled foreign subsidiary's construction project in a third country are services passed through to the... boycotting country Y for computers. A places an order with U.S. company B for some of the components; with U...

  14. 15 CFR 760.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project financing by a United States bank located in the United States to a controlled foreign subsidiary... controlled foreign subsidiary's construction project in a third country are services passed through to the... boycotting country Y for computers. A places an order with U.S. company B for some of the components; with U...

  15. Evaluation Of Traffic Control Devices For Rural High-Speed Maintenance Work Zones: Second Year Activities And Final Recommendations

    DOT National Transportation Integrated Search

    2000-10-01

    This report documents the second year of a two-year project to evaluate the effectiveness of innovative work zone traffic control devices. Researchers evaluated these devices at short-term rural work zones. During the second year of the project, seve...

  16. Remodeling Air Force Cyber Command and Control

    DTIC Science & Technology

    2017-10-10

    AIR FORCE CYBERWORX REPORT: REMODELING AIR FORCE CYBER COMMAND & CONTROL COURSE DESIGN PROJECT CONDUCTED 5 Jan – 5 May 17 Produced...For the Air Force Cyber Command and Control (C2) Design Project, CyberWorx brought together 25 cadets from the United States Air Force Academy...warfighting based upon the findings of the design teams. Participants The design course was attended by a diverse group of civilians from industry

  17. National Stormwater Calculator: Low Impact Development ...

    EPA Pesticide Factsheets

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The Calculator is organized as a wizard style application that walks the user through the steps necessary to perform runoff calculations on a single urban sub-catchment of 10 acres or less in size. Using an interactive map, the user can select the sub-catchment location and the Calculator automatically acquires hydrologic data for the site.A new LID cost estimation module has been developed for the Calculator. This project involved programming cost curves into the existing Calculator desktop application. The integration of cost components of LID controls into the Calculator increases functionality and will promote greater use of the Calculator as a stormwater management and evaluation tool. The addition of the cost estimation module allows planners and managers to evaluate LID controls based on comparison of project cost estimates and predicted LID control performance. Cost estimation is accomplished based on user-identified size (or auto-sizing based on achieving volume control or treatment of a defined design storm), configuration of the LID control infrastructure, and other key project and site-specific variables, including whether the project is being applied as part of new development or redevelopm

  18. Proceedings of a Seminar on Attaining Water Quality Goals through Water Management Procedures, 17-18 February 1982, Dallas, Texas,

    DTIC Science & Technology

    1982-02-01

    slightly above the level of detection. In both projects low-level accumulation of petroleum hydrocarbons was observed. Because of the complex nature of... petroleum hydrocarbons , PCB, total DDT, Cd and lig in test and control organisms surviving a 10-day, solid phlase bioassay for project A. Organisms...of petroleum hydrocarbons , PCB, total DDT, Cd and Hig in test and control organisms surviving a 10-day solid phase bioassay for project B. Organisms

  19. Exe-Guard Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Marshall, Tim; Chavez, Adrian

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirusmore » methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today« less

  20. Environmental Assessment for Toxecon Retrofit for Mercury and Multi-Pollutant Control, Presque Isle Power Plant, Marquette, Michigan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Environmental Assessment (EA) evaluates environmental issues associated with constructing and operating an integrated emissions control system proposed by We Energies and its project partners with cost-shared funding support by DOE. The proposed project would be demonstrated at the existing 90-MW Units 7, 8, and 9 of We Energies' coal-fired Presque Isle Power Plant in Marquette, Michigan. The commercial-scale demonstrate would allow utilities to make decisions regarding the integrated emissions control system as a viable commercial option. DOE's share of the funding for the 5-year demonstration project would be about $25 million, while $25 million would also be provided bymore » We Energies and its project partners. This project was selected by DOE under the Clean Coal Power Initiative (CCPI) for negotiation of a cooperative agreement to demonstrate the integration of technologies to reduce emissions of mercury (Hg) and particulate matter, as well as potentially control sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}) and hydrochloric acid (HCl) emissions. DOE's decision is whether or not to fund the project. The EA evaluates the principal environmental issues, including air quality, waste management, and traffic, that could result from construction and operation of the proposed project. The EA also considers two reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. Key findings include that potential air quality impacts resulting from the proposed project would generally be beneficial because plantwide air emissions would decrease or continue at the same level. The decrease in stack exit temperature would decrease the plume rise, which could result in increased downwind ground-level concentrations of those air pollutants experience little or no decrease in stack emissions. However, results of air dispersion modeling indicated that no major impacts would be expected relative to Prevention of Significant Deterioration increments and National Ambient Air Quality Standards.« less

  1. Porting and refurbishment of the WSS TNG control software

    NASA Astrophysics Data System (ADS)

    Caproni, Alessandro; Zacchei, Andrea; Vuerli, Claudio; Pucillo, Mauro

    2004-09-01

    The Workstation Software Sytem (WSS) is the high level control software of the Italian Galileo Galilei Telescope settled in La Palma Canary Island developed at the beginning of '90 for HP-UX workstations. WSS may be seen as a middle layer software system that manages the communications between the real time systems (VME), different workstations and high level applications providing a uniform distributed environment. The project to port the control software from the HP workstation to Linux environment started at the end of 2001. It is aimed to refurbish the control software introducing some of the new software technologies and languages, available for free in the Linux operating system. The project was realized by gradually substituting each HP workstation with a Linux PC with the goal to avoid main changes in the original software running under HP-UX. Three main phases characterized the project: creation of a simulated control room with several Linux PCs running WSS (to check all the functionality); insertion in the simulated control room of some HPs (to check the mixed environment); substitution of HP workstation in the real control room. From a software point of view, the project introduces some new technologies, like multi-threading, and the possibility to develop high level WSS applications with almost every programming language that implements the Berkley sockets. A library to develop java applications has also been created and tested.

  2. Project FARE Task V : Industry Control Board Meeting (ICB-1)

    DOT National Transportation Integrated Search

    1975-12-16

    Under Project FARE (Financial Accounting and Reporting Elements, (IT-06-0034), uniform standards, definitions, and procedures for reporting, financial and operating data by the urban transit industry were developed. The objective of this project was ...

  3. The pioneer projects: Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  4. Thermal Expert System (TEXSYS): Systems autonomy demonstration project, volume 2. Results

    NASA Technical Reports Server (NTRS)

    Glass, B. J. (Editor)

    1992-01-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS testbed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  5. Thermal Expert System (TEXSYS): Systems automony demonstration project, volume 1. Overview

    NASA Technical Reports Server (NTRS)

    Glass, B. J. (Editor)

    1992-01-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS test bed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  6. Addressing Control Research Issues Leading to Piloted Simulations in Support of the IFCS F-15

    NASA Technical Reports Server (NTRS)

    Napolitano, Marcello; Perhinschi, Mario; Campa, Giampiero; Seanor, Brad

    2004-01-01

    This report summarizes the research effort by a team of researchers at West Virginia University in support of the NASA Intelligent Flight Control System (IFCS) F-15 program. In particular, WVU researchers assisted NASA Dryden researchers in the following technical tasks leading to piloted simulation of the 'Gen_2' IFCS control laws. Task #1- Performance comparison of different neural network (NN) augmentation for the Dynamic Inversion (DI) -based VCAS 'Gen_2' control laws. Task #2- Development of safety monitor criteria for transition to research control laws with and without failure during flight test. Task #3- Fine-tuning of the 'Gen_2' control laws for cross-coupling reduction at post-failure conditions. Matlab/Simulink-based simulation codes were provided to the technical monitor on a regular basis throughout the duration of the project. Additional deliverables for the project were Power Point-based slides prepared for different project meetings. This document provides a description of the methodology and discusses the general conclusions from the simulation results.

  7. Thermal Expert System (TEXSYS): Systems autonomy demonstration project, volume 2. Results

    NASA Astrophysics Data System (ADS)

    Glass, B. J.

    1992-10-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS testbed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  8. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less

  9. Vista goes online: Decision-analytic systems for real-time decision-making in mission control

    NASA Technical Reports Server (NTRS)

    Barry, Matthew; Horvitz, Eric; Ruokangas, Corinne; Srinivas, Sampath

    1994-01-01

    The Vista project has centered on the use of decision-theoretic approaches for managing the display of critical information relevant to real-time operations decisions. The Vista-I project originally developed a prototype of these approaches for managing flight control displays in the Space Shuttle Mission Control Center (MCC). The follow-on Vista-II project integrated these approaches in a workstation program which currently is being certified for use in the MCC. To our knowledge, this will be the first application of automated decision-theoretic reasoning techniques for real-time spacecraft operations. We shall describe the development and capabilities of the Vista-II system, and provide an overview of the use of decision-theoretic reasoning techniques to the problems of managing the complexity of flight controller displays. We discuss the relevance of the Vista techniques within the MCC decision-making environment, focusing on the problems of detecting and diagnosing spacecraft electromechanical subsystems component failures with limited information, and the problem of determining what control actions should be taken in high-stakes, time-critical situations in response to a diagnosis performed under uncertainty. Finally, we shall outline our current research directions for follow-on projects.

  10. Extra projection data identification method for fast-continuous-rotation industrial cone-beam CT.

    PubMed

    Yang, Min; Duan, Shengling; Duan, Jinghui; Wang, Xiaolong; Li, Xingdong; Meng, Fanyong; Zhang, Jianhai

    2013-01-01

    Fast-continuous-rotation is an effective measure to improve the scanning speed and decrease the radiation dose for cone-beam CT. However, because of acceleration and deceleration of the motor, as well as the response lag of the scanning control terminals to the host PC, uneven-distributed and redundant projections are inevitably created, which seriously decrease the quality of the reconstruction images. In this paper, we first analyzed the aspects of the theoretical sequence chart of the fast-continuous-rotation mode. Then, an optimized sequence chart was proposed by extending the rotation angle span to ensure the effective 2π-span projections were situated in the stable rotation stage. In order to match the rotation angle with the projection image accurately, structure similarity (SSIM) index was used as a control parameter for extraction of the effective projection sequence which was exactly the complete projection data for image reconstruction. The experimental results showed that SSIM based method had a high accuracy of projection view locating and was easy to realize.

  11. ACFA 2020 - An FP7 project on active control of flexible fuel efficient aircraft configurations

    NASA Astrophysics Data System (ADS)

    Maier, R.

    2013-12-01

    This paper gives an overview about the project ACFA 2020 which is funded by the European Commission within the 7th framework program. The acronym ACFA 2020 stands for Active Control for Flexible Aircraft 2020. The project is dealing with the design of highly fuel efficient aircraft configurations and, in particular, on innovative active control concepts with the goal to reduce loads and structural weight. Major focus lays on blended wing body (BWB) aircraft. Blended wing body type aircraft configurations are seen as the most promising future concept to fulfill the so-called ACARE (Advisory Council for Aeronautics Research in Europe) vision 2020 goals in regards to reduce fuel consumption and external noise. The paper discusses in some detail the overall goals and how they are addressed in the workplan. Furthermore, the major achievements of the project are outlined and a short outlook on the remaining work is given.

  12. The vaccines consistency approach project: an EPAA initiative.

    PubMed

    De Mattia, F; Hendriksen, C; Buchheit, K H; Chapsal, J M; Halder, M; Lambrigts, D; Redhead, K; Rommel, E; Scharton-Kersten, T; Sesardic, T; Viviani, L; Ragan, I

    2015-01-01

    The consistency approach for release testing of established vaccines promotes the use of in vitro, analytical, non-animal based systems allowing the monitoring of quality parameters during the whole production process. By using highly sensitive non-animal methods, the consistency approach has the potential to improve the quality of testing and to foster the 3Rs (replacement, refinement and reduction of animal use) for quality control of established vaccines. This concept offers an alternative to the current quality control strategy which often requires large numbers of laboratory animals. In order to facilitate the introduction of the consistency approach for established human and veterinary vaccine quality control, the European Partnership for Alternatives to Animal Testing (EPAA) initiated a project, the "Vaccines Consistency Approach Project", aiming at developing and validating the consistency approach with stakeholders from academia, regulators, OMCLs, EDQM, European Commission and industry. This report summarises progress since the project's inception.

  13. SMART-1, Platform Design and Project Status

    NASA Astrophysics Data System (ADS)

    Sjoberg, F.

    SMART-1 is the first of the Small Missions for Advanced Research and Technology (SMART), an element of ESA's Horizons 2000 plan for scientific projects. These missions aim at testing key technologies for future Cornerstone missions. The mission of SMART-1 is the flight demonstration of Electric Primary Propulsion for a scientifically relevant deep space trajectory. More specifically, SMART-1 will be launched into a geostationary transfer orbit and use a single ion thruster to achieve lunar orbit. include: -A modern avionics architecture with a clean-cut control hierarchy -Extensive Failure Detection, Isolation and Recovery (FDIR) capabilities following the control hierarchy of the -An advanced power control and distribution system -A newly developed gimbal mechanism for the orientation of the electric ion thruster The project is currently in the FM AIT phase scheduled for launch in late 2002. The paper will describe the SMART- 1 spacecraft platform design as well as the current project and spacecraft verification status.

  14. Project Designed to Educate Public on Chemicals Starts Up.

    ERIC Educational Resources Information Center

    Baum, Rudy

    1984-01-01

    The Chemical Education for Public Understanding Project is a three-year pilot project designed to provide the public with accurate information on uses and hazards of chemicals, ranging from control of garden pests to types of toxic wastes generated by industry. Discusses project aims and educational materials to be developed. (JN)

  15. Designing Project-Based Courses with a Focus on Group Formation and Assessment

    ERIC Educational Resources Information Center

    Richards, Debbie

    2009-01-01

    The value and the pitfalls of project and group work are well recognized. The principles and elements which apply to projects in general, apply to project-based courses. Thoughtful and detailed planning, understanding of the stakeholders and their needs, a good design, appropriate testing, monitoring and quality control and continual management…

  16. Function projective synchronization of memristor-based Cohen-Grossberg neural networks with time-varying delays.

    PubMed

    Abdurahman, Abdujelil; Jiang, Haijun; Rahman, Kaysar

    2015-12-01

    This paper deals with the problem of function projective synchronization for a class of memristor-based Cohen-Grossberg neural networks with time-varying delays. Based on the theory of differential equations with discontinuous right-hand side, some novel criteria are obtained to realize the function projective synchronization of addressed networks by combining open loop control and linear feedback control. As some special cases, several control strategies are given to ensure the realization of complete synchronization, anti-synchronization and the stabilization of the considered memristor-based Cohen-Grossberg neural network. Finally, a numerical example and its simulations are provided to demonstrate the effectiveness of the obtained results.

  17. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  18. Project Manager Personality as a Factor for Success

    DTIC Science & Technology

    2008-03-01

    the project manager includes planning , 1 organizing, directing, and controlling the project (Program Management Institute, 2004; Kerzner, 2006). By...programs identified 5 percent cost growth per year from 2004 to 2007, costing $165 billion dollars more than originally planned (United States...Bjeirmi, 1996) and point out that good project managers can "contribute to project success, but are unlikely to prevent failure" ( de Witt, 1988, p

  19. Anytime synthetic projection: Maximizing the probability of goal satisfaction

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Bresina, John L.

    1990-01-01

    A projection algorithm is presented for incremental control rule synthesis. The algorithm synthesizes an initial set of goal achieving control rules using a combination of situation probability and estimated remaining work as a search heuristic. This set of control rules has a certain probability of satisfying the given goal. The probability is incrementally increased by synthesizing additional control rules to handle 'error' situations the execution system is likely to encounter when following the initial control rules. By using situation probabilities, the algorithm achieves a computationally effective balance between the limited robustness of triangle tables and the absolute robustness of universal plans.

  20. Lessons learned on the Ground Test Accelerator control system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kozubal, A.J.; Weiss, R.E.

    1994-09-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers` toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks tomore » deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ``Experimental Physics and Industrial Control System`` (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects.« less

  1. Sensor supervision and multiagent commanding by means of projective virtual reality

    NASA Astrophysics Data System (ADS)

    Rossmann, Juergen

    1998-10-01

    When autonomous systems with multiple agents are considered, conventional control- and supervision technologies are often inadequate because the amount of information available is often presented in a way that the user is effectively overwhelmed by the displayed data. New virtual reality (VR) techniques can help to cope with this problem, because VR offers the chance to convey information in an intuitive manner and can combine supervision capabilities and new, intuitive approaches to the control of autonomous systems. In the approach taken, control and supervision issues were equally stressed and finally led to the new ideas and the general framework for Projective Virtual Reality. The key idea of this new approach for an intuitively operable man machine interface for decentrally controlled multi-agent systems is to let the user act in the virtual world, detect the changes and have an action planning component automatically generate task descriptions for the agents involved to project actions that have been carried out by users in the virtual world into the physical world, e.g. with the help of robots. Thus the Projective Virtual Reality approach is to split the job between the task deduction in the VR and the task `projection' onto the physical automation components by the automatic action planning component. Besides describing the realized projective virtual reality system, the paper will also describe in detail the metaphors and visualization aids used to present different types of (e.g. sensor-) information in an intuitively comprehensible manner.

  2. Controllable 3D Display System Based on Frontal Projection Lenticular Screen

    NASA Astrophysics Data System (ADS)

    Feng, Q.; Sang, X.; Yu, X.; Gao, X.; Wang, P.; Li, C.; Zhao, T.

    2014-08-01

    A novel auto-stereoscopic three-dimensional (3D) projection display system based on the frontal projection lenticular screen is demonstrated. It can provide high real 3D experiences and the freedom of interaction. In the demonstrated system, the content can be changed and the dense of viewing points can be freely adjusted according to the viewers' demand. The high dense viewing points can provide smooth motion parallax and larger image depth without blurry. The basic principle of stereoscopic display is described firstly. Then, design architectures including hardware and software are demonstrated. The system consists of a frontal projection lenticular screen, an optimally designed projector-array and a set of multi-channel image processors. The parameters of the frontal projection lenticular screen are based on the demand of viewing such as the viewing distance and the width of view zones. Each projector is arranged on an adjustable platform. The set of multi-channel image processors are made up of six PCs. One of them is used as the main controller, the other five client PCs can process 30 channel signals and transmit them to the projector-array. Then a natural 3D scene will be perceived based on the frontal projection lenticular screen with more than 1.5 m image depth in real time. The control section is presented in detail, including parallax adjustment, system synchronization, distortion correction, etc. Experimental results demonstrate the effectiveness of this novel controllable 3D display system.

  3. Gaming Space: A Game-Theoretic Methodology for Assessing the Deterrent Value of Space Control Options

    DTIC Science & Technology

    2018-06-07

    Gaming Space A Game-Theoretic Methodology for Assessing the Deterrent Value of Space Control Options C O R...in space. Adversaries have already employed non -kinetic OSC capabilities, such as Global Positioning System jammers, in recent conflicts, and they...as part of the project “Assessing the Deterrent Value of Defensive Space Control Options.” The purpose of the project was to develop a methodology

  4. The Impact of the Project K Youth Development Program on Self-Efficacy: A Randomized Controlled Trial.

    PubMed

    Deane, Kelsey L; Harré, Niki; Moore, Julie; Courtney, Matthew G R

    2017-03-01

    A key issue for youth development programs is whether the learning they provide is transferred to participants' daily lives. It is also important that they are effective for the diverse range of participants they attract. This study used a randomized controlled trial design to measure the impact of Project K, a New Zealand-based youth development program, on academic and social self-efficacy. Project K combines a 3-week wilderness adventure, a 10 day community service component, and 1 year of mentoring to promote positive growth in 14-15 year olds with low self-efficacy. At baseline, the evaluation included 600 Project K (46 % female) and 577 Control participants (48 % female) and revealed that Project K was effective in improving both social and academic self-efficacy from pre- to post-program with effects being sustained 1 year later. Parents' perceptions of changes in the participants' interpersonal skills supported these findings. Differential program effects were found across participant subgroups, particularly 1 year after program completion. The implications of these differences are discussed.

  5. Corticostriatal Regulation of Acute Pain

    PubMed Central

    Martinez, Erik; Lin, Harvey H.; Zhou, Haocheng; Dale, Jahrane; Liu, Kevin; Wang, Jing

    2017-01-01

    The mechanisms for acute pain regulation in the brain are not well understood. The prefrontal cortex (PFC) provides top-down control of emotional processes, and it projects to the nucleus accumbens (NAc). This corticostriatal projection forms an important regulatory pathway within the brain’s reward system. Recently, this projection has been suggested to control both sensory and affective phenotypes specifically associated with chronic pain. As this projection is also known to play a role in the transition from acute to chronic pain, we hypothesized that this corticostriatal circuit can also exert a modulatory function in the acute pain state. Here, we used optogenetics to specifically target the projection from the PFC to the NAc. We tested sensory pain behaviors with Hargreaves’ test and mechanical allodynia, and aversive pain behaviors with conditioned place preference (CPP) test. We found that the activation of this corticostriatal circuit gave rise to bilateral relief from peripheral nociceptive inputs. Activation of this circuit also provided important control for the aversive response to transient noxious stimulations. Hence, our results support a novel role for corticostriatal circuitry in acute pain regulation. PMID:28603489

  6. Conceptual framework of the Controlling Asthma in American Cities Project.

    PubMed

    Herman, Elizabeth Jane

    2011-02-01

    The Controlling Asthma in American Cities Project (CAACP) was designed to improve the control of asthma in inner-city populations of children with a disparate burden of symptoms and adverse outcomes. As with many chronic diseases, asthma is the manifestation of multiple biologic, environmental, and social determinants. In addition to appropriate medical management, individuals with asthma must have logistical, financial, and cultural access to environments that allow avoidance of asthma triggers and encourage good asthma management practices. In recognition of this complexity, the CAACP required the seven project sites to coordinate and synchronize multiple interventions (education, healthcare access, medical management, trigger reduction) at multiple levels (individual, home, school, community, and policy) through the collaboration of relevant groups, institutions, and individuals. This paper describes the "program theory" of the CAACP project-the assumptions about how the project worked, how the components were linked, and what outcomes were anticipated. It relates the subsequent papers in the supplement to the program theory and describes how the papers can inform and guide other community-based interventions, and advance the translation of scientific knowledge to effective interventions in communities of need.

  7. EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement

    NASA Astrophysics Data System (ADS)

    Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.

    2017-08-01

    A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.

  8. Longitudinal impact of the project PATHS on adolescent risk behavior: what happened after five years?

    PubMed

    Shek, Daniel T L; Yu, Lu

    2012-01-01

    The present study investigated the longitudinal impact of the Project PATHS, a large-scale curriculum-based positive youth development program in Hong Kong, on the development of adolescents' risk behavior over a period of five years. Using a longitudinal randomized controlled design, eight waves of data were collected from 19 experimental schools in which students participated in the Project PATHS (N = 2,850 at Wave 8) and 24 control schools without joining the Project PATHS (N = 3,640 at Wave 8). At each wave, students responded to measures assessing their current risk behaviors, including delinquency, use of different types of drug, and their intentions of participating in risk behaviors in the future. Results demonstrated that adolescents receiving the program exhibited significantly slower increases in delinquent behaviors and substance use as compared to the control participants. During two years after the completion of the program, differences in youth risk behaviors in the two groups still existed. These results suggest that the Project PATHS has long-term effect in preventing adolescent problem behavior through promoting positive youth development.

  9. 33 CFR 274.7 - Authorization of pesticide use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF DEFENSE PEST CONTROL PROGRAM FOR CIVIL WORKS PROJECTS Project Operation § 274.7 Authorization... unexpected outbreak of a pest requires control measures which are not according to the registered use, such... Engineer. An emergency will be deemed to exist when: (1) A pest outbreak has or is about to occur and no...

  10. CACTUS: Command and Control Training Using Knowledge-Based Simulations

    ERIC Educational Resources Information Center

    Hartley, Roger; Ravenscroft, Andrew; Williams, R. J.

    2008-01-01

    The CACTUS project was concerned with command and control training of large incidents where public order may be at risk, such as large demonstrations and marches. The training requirements and objectives of the project are first summarized justifying the use of knowledge-based computer methods to support and extend conventional training…

  11. A Case Study on the Failure of Management Controls around Expected Benefit Development

    ERIC Educational Resources Information Center

    Parsons, Earl H.

    2013-01-01

    Organization leaders manage change through projects to realize specific expected benefits. Under Expectation-Confirmation theory, expected benefits can be used to judge the ongoing viability and final success of the project. Organization leaders often develop management controls to ensure that the expected benefits are defined to allow their use…

  12. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  13. Increase of Investment Appeal of Projects for Noise Control Measures in Urban Environment

    NASA Astrophysics Data System (ADS)

    Kolmakov, A. V.; Ignatyeva, V. O.

    2017-11-01

    The authors analyzed the contemporary noise pollution level in the large cities of the Russian Federation. The article identifies the factors causing the reduction of acoustically comfortable urban territories. It states the task for the increase of investment appeal of the projects aimed at noise control measures adoption.

  14. DSS 13 microprocessor antenna controller

    NASA Technical Reports Server (NTRS)

    Gosline, R. M.

    1988-01-01

    A microprocessor-based antenna monitor and control system with multiple CPUs are described. The system was developed as part of the unattended station project for DSS 13 and was enhanced for use by the SETI project. The operational features, hardware, and software designs are described, and a discussion is provided of the major problems encountered.

  15. 9 CFR 79.7 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Waiver of requirements for scrapie control pilot projects. 79.7 Section 79.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  16. 9 CFR 54.9 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Waiver of requirements for scrapie control pilot projects. 54.9 Section 54.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  17. 9 CFR 54.9 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Waiver of requirements for scrapie control pilot projects. 54.9 Section 54.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  18. 9 CFR 79.7 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Waiver of requirements for scrapie control pilot projects. 79.7 Section 79.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  19. 9 CFR 79.7 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Waiver of requirements for scrapie control pilot projects. 79.7 Section 79.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  20. 9 CFR 79.7 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Waiver of requirements for scrapie control pilot projects. 79.7 Section 79.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  1. 9 CFR 54.9 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Waiver of requirements for scrapie control pilot projects. 54.9 Section 54.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  2. 9 CFR 79.7 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Waiver of requirements for scrapie control pilot projects. 79.7 Section 79.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  3. 9 CFR 54.9 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Waiver of requirements for scrapie control pilot projects. 54.9 Section 54.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  4. 9 CFR 54.9 - Waiver of requirements for scrapie control pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contains testing or other procedures that indicate that an animal, despite meeting the definition of high... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Waiver of requirements for scrapie control pilot projects. 54.9 Section 54.9 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION...

  5. DOTD support for UTC project : development of an optimal ramp metering control strategy for I-12, [research project capsule].

    DOT National Transportation Integrated Search

    2013-10-01

    From June to November of 2010, the Louisiana Department of Transportation and : Development (DOTD) deployed ramp metering control, using a simple pre-timed operation : with a xed cycle length (2 seconds of green/2 seconds of red), along a 15-mile ...

  6. Development of a traffic control devices and pavement markings manual for Iowa's cities and counties with a survey of common practices

    DOT National Transportation Integrated Search

    2001-04-01

    The purpose of this project was to develop and distribute a manual that would provide local agencies in Iowa with practical advice and guidance for traffic control devices and pavement markings installation and maintenance. The project included the f...

  7. The Implications of the Net Fiscal Benefits Criterion for Cost Sharing in Flood Control Projects.

    DTIC Science & Technology

    controversial areas. First, it is concluded that the net fiscal benefits criterion has important advantages in the determination of what local governments...would be willing to contribute to the cost of flood control projects, but somewhat less applicability to the analysis of economic efficiency benefits and

  8. Implementation of a hypertension control program in the County of North Karelia, Finland

    PubMed Central

    Nissinen, Aulikki; Tuomilehto, Jaako; Elo, Jyrki; Salonen, Jukka T.; Puska, Pekka

    1981-01-01

    A hypertension control program was established as part of the more comprehensive North Karelia Project. This project was started in 1972 in response to a petition from the population of North Karelia, a county in Finland, asking for national assistance to reduce the exceptionally high cardiovascular disease mortality and morbidity in the area. The North Karelia Project was carried out from 1972 to 1977. The hypertension control program was implemented mainly in local health centers by physicians and public health nurses, who followed guidelines issued by the project staff and worked under its supervision. Although the target population for the North Karelia Project was the entire population of North Karelia, the project focused on middle-aged men. The hypertension subprogram was introduced in steps. Its objectives included the training of health personnel, establishment of an information system in the county to educate people about hypertension, and organization of the detection, treatment, and followup of hypertensives. A hypertension dispensary was established in each of the 12 health centers in the county. Continuous training of the local public health nurses and physicians faciliated integration of the hypertension program into the operations of the health centers. A central hypertension register and the hypertension control clinics at the health centers were the essential tools in the systematic followup of hypertensives. Some 17,000 hypertensives were on the register by the end of the 5-year project. The main aim in providing health education about hypertension, as well as in treating hypertension itself, was to prevent severe cardiovascular diseases as a whole. Therefore the hypertension control program was integrated into the comprehensive cardiovascular disease control program, and hypertensives received advice concerning smoking and dietary changes as well as about high blood pressure. A survey of health care personnel in North Karelia and in a reference area showed that the care of hypertensives was more systematic in North Karelia and that its health care personnel were more satisfied with the cardiovascular disease care that was provided. PMID:7302104

  9. Cost/Schedule Control Systems Criteria: A Reference Guide to C/SCSC information

    DTIC Science & Technology

    1992-09-01

    Smith, Larry A. "Mainframe ARTEMIS: More than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988...A. "Mainframe ARTEMIS: More than a Project Management Tool - Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 14...than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 17. Trufant, Thomas M. and Robert

  10. Placing invasive species management in a spatiotemporal context.

    PubMed

    Baker, Christopher M; Bode, Michael

    2016-04-01

    Invasive species are a worldwide issue, both ecologically and economically. A large body of work focuses on various aspects of invasive species control, including how to allocate control efforts to eradicate an invasive population as cost effectively as possible: There are a diverse range of invasive species management problems, and past mathematical analyses generally focus on isolated examples, making it hard to identify and understand parallels between the different contexts. In this study, we use a single spatiotemporal model to tackle the problem of allocating control effort for invasive species when suppressing an island invasive species, and for long-term spatial suppression projects. Using feral cat suppression as an illustrative example, we identify the optimal resource allocation for island and mainland suppression projects. Our results demonstrate how using a single model to solve different problems reveals similar characteristics of the solutions in different scenarios. As well as illustrating the insights offered by linking problems through a spatiotemporal model, we also derive novel and practically applicable results for our case studies. For temporal suppression projects on islands, we find that lengthy projects are more cost effective and that rapid control projects are only economically cost effective when population growth rates are high or diminishing returns on control effort are low. When suppressing invasive species around conservation assets (e.g., national parks or exclusion fences), we find that the size of buffer zones should depend on the ratio of the species growth and spread rate.

  11. Cal Poly Space Project G-279

    NASA Technical Reports Server (NTRS)

    Farley, David R.

    1987-01-01

    The Cal Poly Space Project is an effort on the part of several highly motivated students to deploy a space canister which will examine the effects of microgravity on electroplating and immiscible metals. The experiments will be controlled and monitored by a specialized triple redundancy system developed to defer the possible electronic errors due to uncontrollable factors such as photons from the Sun. With the finalization of the payload design and the near completion of the data control system, the integration phase of the project is anticipated to be completed and the project ready for launching by early 1987. It is hoped that the experiments will lead to new insights in space research and also prove profitable to industry.

  12. The Pioneer Projects - Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  13. Stapleton Microburst Advisory Service Project : An Operational Viewpoint.

    DOT National Transportation Integrated Search

    1985-09-01

    A microburst advisory service project was conducted at Stapleton Airport for a six week period during the summer of 1984. This report describes what took place during the project and what was learned from an operational, air traffic control viewpoint...

  14. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  15. Constellation Training Facility Support

    NASA Technical Reports Server (NTRS)

    Flores, Jose M.

    2008-01-01

    The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The CxTF support provided is one that requires continuous maintenance since the project is still on initial development phases.

  16. Using tailored methodical approaches to achieve optimal science outcomes

    NASA Astrophysics Data System (ADS)

    Wingate, Lory M.

    2016-08-01

    The science community is actively engaged in research, development, and construction of instrumentation projects that they anticipate will lead to new science discoveries. There appears to be very strong link between the quality of the activities used to complete these projects, and having a fully functioning science instrument that will facilitate these investigations.[2] The combination of using internationally recognized standards within the disciplines of project management (PM) and systems engineering (SE) has been demonstrated to lead to achievement of positive net effects and optimal project outcomes. Conversely, unstructured, poorly managed projects will lead to unpredictable, suboptimal project outcomes ultimately affecting the quality of the science that can be done with the new instruments. The proposed application of these two specific methodical approaches, implemented as a tailorable suite of processes, are presented in this paper. Project management (PM) is accepted worldwide as an effective methodology used to control project cost, schedule, and scope. Systems engineering (SE) is an accepted method that is used to ensure that the outcomes of a project match the intent of the stakeholders, or if they diverge, that the changes are understood, captured, and controlled. An appropriate application, or tailoring, of these disciplines can be the foundation upon which success in projects that support science can be optimized.

  17. Minnesota River at Chaska, Minnesota Flood Control Project. General Design Memorandum and Draft Supplement II to the Final Environmental Impact Statement. Revision.

    DTIC Science & Technology

    1984-08-01

    Munesota. Flood Control Project (Geotechnical Cmmts). 2. Inclosed m ou resposes to the above-cited c ts. POt IT G0MVOAU: I Incl PC=U A. P13HR S Cdf...I . 4,! year period to house about 4b,O00 people in a self -contained community. Projections noted in the 1973 feasibility report were for a total...incorporation of trails for nature study, hiking, self -propelled bicycle, horseback riding, snowshoe, cross- country ski, and access by fishermen and

  18. NERI Project 99-119. A New Paradigm for Automatic Development of Highly Reliable Control Architectures for Nuclear Power Plants. Phase-2 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    March-Leuba, JA

    2002-01-15

    This report describes the tasks performed and the progress made during Phase 2 of the DOE-NERI project number 99-119 entitled Automatic Development of Highly Reliable Control Architecture for Future Nuclear Power Plants. This project is a collaboration effort between the Oak Ridge National Laboratory (ORNL), The University of Tennessee, Knoxville (UTK) and the North Carolina State University (NCSU). ORNL is the lead organization and is responsible for the coordination and integration of all work.

  19. The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

    NASA Technical Reports Server (NTRS)

    Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)

    2002-01-01

    NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

  20. Experiential learning in control systems laboratories and engineering project management

    NASA Astrophysics Data System (ADS)

    Reck, Rebecca Marie

    Experiential learning is a process by which a student creates knowledge through the insights gained from an experience. Kolb's model of experiential learning is a cycle of four modes: (1) concrete experience, (2) reflective observation, (3) abstract conceptualization, and (4) active experimentation. His model is used in each of the three studies presented in this dissertation. Laboratories are a popular way to apply the experiential learning modes in STEM courses. Laboratory kits allow students to take home laboratory equipment to complete experiments on their own time. Although students like laboratory kits, no previous studies compared student learning outcomes on assignments using laboratory kits with existing laboratory equipment. In this study, we examined the similarities and differences between the experiences of students who used a portable laboratory kit and students who used the traditional equipment. During the 2014- 2015 academic year, we conducted a quasi-experiment to compare students' achievement of learning outcomes and their experiences in the instructional laboratory for an introductory control systems course. Half of the laboratory sections in each semester used the existing equipment, while the other sections used a new kit. We collected both quantitative data and qualitative data. We did not identify any major differences in the student experience based on the equipment they used. Course objectives, like research objectives and product requirements, help provide clarity and direction for faculty and students. Unfortunately, course and laboratory objectives are not always clearly stated. Without a clear set of objectives, it can be hard to design a learning experience and determine whether students are achieving the intended outcomes of the course or laboratory. In this study, I identified a common set of laboratory objectives, concepts, and components of a laboratory apparatus for undergraduate control systems laboratories. During the summer of 2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects course. Two students from the project management course function as project managers and lead a team of undergraduate students in the second course through a project. I studied how closely the project management experience in these courses aligns with engineering project management in industry. In the spring of 2015, I enrolled in the project management course at a large Midwestern university. I used analytic autoethnography to compare my experiences in the course with my experiences as a project engineer at a large aerospace company. I found that the experience in the course provided an authentic and comprehensive opportunity to practice most of the skills listed in the Project Management Book of Knowledge (an industry standard) as necessary for project managers. Some components of the course that made it successful: I was the project manager for the whole term, I worked with a real client, and the team defined and delivered the project before the end of the semester.

  1. Accuracy of Orthomosaic Generated by Different Methods in Example of UAV Platform MUST Q

    NASA Astrophysics Data System (ADS)

    Liba, N.; Berg-Jürgens, J.

    2015-11-01

    Development of photogrammetry has reached a new level due to the use of unmanned aerial vehicles (UAV). In Estonia, the main areas of use of UAVs are monitoring overhead power lines for energy companies and fields in agriculture, and estimating the use of stockpile in mining. The project was carried out by the order of the City of Tartu for future road construction. In this research, automation of UAV platform MUST Q aerial image processing and reduction of time spent on the use of ground control points (GCP) is studied. For that two projects were created with software Pix4D. First one was processed automatically without GCP. Second one did use GCP, but all the processing was done automatically. As the result of the project, two orthomosaics with the pixel size of 5 cm were composed. Projects allowed ensuring accuracy limit of three times of the pixel size. The project that turned out to be the most accurate was the one using ground control points to do the levelling, which remained within the error limit allowed and the accuracy of the orthomosaic was 0.132 m. The project that didn't use ground control points had the accuracy of 1.417 m.

  2. Flood Control, Mississippi River, La Crosse, Wisconsin.

    DTIC Science & Technology

    1975-10-01

    end SuP.,tifle) S TYPE OF REPORT & PERIOD COVEkr FINAL ENVIRONMENTAL IMPACT STATEMENT FLOOD CONTROL MISSISSIPPI RIVER LA CROSSE, WISCONSIN Pinal FIq 6...PERFORMING ORG. REPORT NUMBER 7. AUTHOR(e) 0 CONTRACT OR GRANT NUMBER( s ) 9 PERFORMING ORGANIZATION NAME AND ADrRESS 10. PROGRAM ELEMENT. PROJECT, T...rev s eflA ff r,,.e.. ind IdeInify by block rnmber) "-The proposed action is a flood control project consisting of levees, road raises, flood wall

  3. Career Profiles- Drawing Controller Kelvin Siu- Operations Engineering Branch

    NASA Image and Video Library

    2016-06-23

    The Drawing Control group provides project support in the form of drafting services, drawing version management, and drawing archival. The office provides drafting services through creation of new drawings and sketches, or integration of red-lines. They maintain physical and electronic storage of flight vehicle drawings, and archive all sketches for the AFRC community. This office is the controlling organization for all Armstrong drawing formats and maintains the drawing numbering system for flight vehicle projects.

  4. A gesture-controlled projection display for CT-guided interventions.

    PubMed

    Mewes, A; Saalfeld, P; Riabikin, O; Skalej, M; Hansen, C

    2016-01-01

    The interaction with interventional imaging systems within a sterile environment is a challenging task for physicians. Direct physician-machine interaction during an intervention is rather limited because of sterility and workspace restrictions. We present a gesture-controlled projection display that enables a direct and natural physician-machine interaction during computed tomography (CT)-based interventions. Therefore, a graphical user interface is projected on a radiation shield located in front of the physician. Hand gestures in front of this display are captured and classified using a leap motion controller. We propose a gesture set to control basic functions of intervention software such as gestures for 2D image exploration, 3D object manipulation and selection. Our methods were evaluated in a clinically oriented user study with 12 participants. The results of the performed user study confirm that the display and the underlying interaction concept are accepted by clinical users. The recognition of the gestures is robust, although there is potential for improvements. The gesture training times are less than 10 min, but vary heavily between the participants of the study. The developed gestures are connected logically to the intervention software and intuitive to use. The proposed gesture-controlled projection display counters current thinking, namely it gives the radiologist complete control of the intervention software. It opens new possibilities for direct physician-machine interaction during CT-based interventions and is well suited to become an integral part of future interventional suites.

  5. 2010 Carl Ludwig Distinguished Lectureship of the APS Neural Control and Autonomic Regulation Section: Central neural pathways for thermoregulatory cold defense

    PubMed Central

    2011-01-01

    Central neural circuits orchestrate the homeostatic repertoire to maintain body temperature during environmental temperature challenges and to alter body temperature during the inflammatory response. This review summarizes the research leading to a model representing our current understanding of the neural pathways through which cutaneous thermal receptors alter thermoregulatory effectors: the cutaneous circulation for control of heat loss, and brown adipose tissue, skeletal muscle, and the heart for thermogenesis. The activation of these effectors is regulated by parallel but distinct, effector-specific core efferent pathways within the central nervous system (CNS) that share a common peripheral thermal sensory input. The thermal afferent circuit from cutaneous thermal receptors includes neurons in the spinal dorsal horn projecting to lateral parabrachial nucleus neurons that project to the medial aspect of the preoptic area. Within the preoptic area, warm-sensitive, inhibitory output neurons control heat production by reducing the discharge of thermogenesis-promoting neurons in the dorsomedial hypothalamus. The rostral ventromedial medulla, including the raphe pallidus, receives projections form the dorsomedial hypothalamus and contains spinally projecting premotor neurons that provide the excitatory drive to spinal circuits controlling the activity of thermogenic effectors. A distinct population of warm-sensitive preoptic neurons controls heat loss through an inhibitory input to raphe pallidus sympathetic premotor neurons controlling cutaneous vasoconstriction. The model proposed for central thermoregulatory control provides a platform for further understanding of the functional organization of central thermoregulation. PMID:21270352

  6. Cost Control

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2009-01-01

    When Fayette County (Kentucky) school officials began putting together estimates for upcoming renovation projects at two elementary schools, they based their projections on their district construction projects from 2007. But by February, when construction bids were opened for the renovations of Cassidy and Russell Cave elementary schools, the…

  7. Software quality assurance plan for GCS

    NASA Technical Reports Server (NTRS)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  8. A closed-loop control-loading system

    NASA Technical Reports Server (NTRS)

    Ashworth, B. R.; Parrish, R. V.

    1979-01-01

    Langley Differential Maneuvering Simulator (DMS) realistically simulates two aircraft operating in differential mode. It consists of two identical fixed-base cockpits and dome projection systems. Each projection system consists of sky/Earth projector and target-image generator and projector. Although programmable control forces are small part of overall system, they play large role in providing pilot with kinesthetic cues.

  9. Development and Testing of a Nuclear Quality Assurance/Quality Control Technician Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Espy, John; And Others

    A project was conducted to field test selected first- and second-year courses in a postsecondary nuclear quality assurance/quality control (QA/QC) technician curriculum and to develop the teaching/learning modules for seven technical specialty courses remaining in the QA/QC technician curriculum. The field testing phase of the project involved the…

  10. The Influence of Experiential Instruction on Urban Elementary Students' Knowledge of the Food and Fiber System.

    ERIC Educational Resources Information Center

    Mabie, Rachel; Baker, Matt

    1996-01-01

    Inner-city fifth and sixth graders were divided as follows: 56 conducted 10-week garden projects; 57 did short, in-class projects; and 31 controls were taught by traditional methods. Both treatment groups improved pretest knowledge of food and fiber by 70-80%, compared to 11% increase among controls. (SK)

  11. The battle against bark beetles in Crater Lake National Park: 1925-34

    Treesearch

    B.E. Wickman

    1987-01-01

    This history records the first large-scale bark beetle control project in a national park in the Pacific Northwest. It describes the relations between Park Service, Forest Service, and USDA Bureau of Entomology personnel; how the project was organized; the ecological implications of the outbreak; and the long-term results of direct control measures.

  12. Effectiveness of the Area-wide Pest Management Program to Control Asian Tiger Mosquito in New Jersey: Evidence from a Household Survey

    USDA-ARS?s Scientific Manuscript database

    Households’ behaviors can both mitigate and measure the spread of urban mosquitos. Beginning in 2009, a comprehensive area-wide pest management (AWPM) project to control Aedes albopictus was implemented in 4 areas in Monmouth and Mercer Counties, New Jersey. Including other activities, the project f...

  13. Effectiveness of the area wide pest management program to control asian tiger mosquito in New Jersey: evidence from a household survey

    USDA-ARS?s Scientific Manuscript database

    Households’ behaviors can both mitigate and measure the spread of urban mosquito species. Beginning in 2009, an area-wide pest management (AWPM) project to control Ae. Albopictus was implemented in 6 areas in Monmouth and Mercer counties, NJ. Including other activities, the project focused on increa...

  14. Particle Swarm-Based Translation Control for Immersed Tunnel Element in the Hong Kong-Zhuhai-Macao Bridge Project

    NASA Astrophysics Data System (ADS)

    Li, Jun-jun; Yang, Xiao-jun; Xiao, Ying-jie; Xu, Bo-wei; Wu, Hua-feng

    2018-03-01

    Immersed tunnel is an important part of the Hong Kong-Zhuhai-Macao Bridge (HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.

  15. One-Year Effects of Project EX in Spain: A Classroom-Based Smoking Prevention and Cessation Intervention Program

    PubMed Central

    Gonzálvez, María T.; Espada, José P.; Orgilés, Mireia; Soto, Daniel; Sussman, Steve

    2015-01-01

    Background Tobacco use prevalence rates are high among Spanish adolescents. Programming to counteract tobacco use is needed. Methods and Findings The current study provides a one-year follow-up outcome evaluation of Project EX, an eight-session classroom-based curriculum. The intervention was tested using a randomized controlled trial with 1,546 Spanish students, involving three program and three control schools. Compared to the control condition, the program condition revealed a greater reduction in nicotine dependence (p < .05) and CO ppm levels (p < .001), and lower consumption of cigarettes at last month (p = .03). Conclusions Long-term outcomes of the Project EX classroom-based program are promising for adolescent prevention and possibly cessation in Spain. PMID:26090821

  16. FRACTAL Systems & Project suite: engineering tools for improving development and operation of the systems

    NASA Astrophysics Data System (ADS)

    Pérez-Calpena, A.; Mujica-Alvarez, E.; Osinde-Lopez, J.; García-Vargas, M.

    2008-07-01

    This paper describes the FRACTAL Systems & Projects suite. This suite is composed by several tools (GECO, DOCMA and SUMO) that provide the capabilities that all organizations need to store and manage the system information generated along the project's lifetime, from the design phase to the operation phase. The amount of information that is generated in a project keeps growing in size and complexity along the project's lifetime, to an extent that it becomes impossible to manage it without the aid of specific computer-based tools. The suite described in this paper is the solution developed by FRACTAL to assist the execution of different scientific projects, mainly related with telescopes and instruments, for astronomical research centres. These tools help the system and project engineers to maintain the technical control of the systems and to ensure an optimal use of the resources. GECO eases the control of the system configuration data; DOCMA provides the means to organise and manage the documents generated in the project; SUMO allows managing and scheduling the operation, the maintenance activities and the resources during the operational phase of a system. These tools improve the project communication making the information available to the authorized users (project team, customers, Consortium's members, etc). Finally and depending on the project needs, these three tools can be used integrated or in an independent manner.

  17. Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity

    NASA Astrophysics Data System (ADS)

    Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka

    Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.

  18. VST project: distributed control system overview

    NASA Astrophysics Data System (ADS)

    Mancini, Dario; Mazzola, Germana; Molfese, C.; Schipani, Pietro; Brescia, Massimo; Marty, Laurent; Rossi, Emilio

    2003-02-01

    The VLT Survey Telescope (VST) is a co-operative program between the European Southern Observatory (ESO) and the INAF Capodimonte Astronomical Observatory (OAC), Naples, for the study, design, and realization of a 2.6-m wide-field optical imaging telescope to be operated at the Paranal Observatory, Chile. The telescope design, manufacturing and integration are responsibility of OAC. The VST has been specifically designed to carry out stand-alone observations in the UV to I spectral range and to supply target databases for the ESO Very Large Telescope (VLT). The control hardware is based on a large utilization of distributed embedded specialized controllers specifically designed, prototyped and manufactured by the Technology Working Group for VST project. The use of a field bus improves the whole system reliability in terms of high level flexibility, control speed and allow to reduce drastically the plant distribution in the instrument. The paper describes the philosophy and the architecture of the VST control HW with particular reference to the advantages of this distributed solution for the VST project.

  19. Fiber-optic projected-fringe digital interferometry

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Beheim, Glenn

    1990-01-01

    A phase-stepped projected-fringe interferometer was developed which uses a closed-loop fiber-optic phase-control system to make very accurate surface profile measurements. The closed-loop phase-control system greatly reduces phase-stepping error, which is frequently the dominant source of error in digital interferometers. Two beams emitted from a fiber-optic coupler are combined to form an interference fringe pattern on a diffusely reflecting object. Reflections off of the fibers' output faces are used to create a phase-indicating signal for the closed-loop optical phase controller. The controller steps the phase difference between the two beams by pi/2 radians in order to determine the object's surface profile using a solid-state camera and a computer. The system combines the ease of alignment and automated data reduction of phase-stepping projected-fringe interferometry with the greatly improved phase-stepping accuracy of our closed-loop phase-controller. The system is demonstrated by measuring the profile of a plate containing several convex surfaces whose heights range from 15 to 25 micron high.

  20. Development of a Low-Lift Chiller Controller and Simplified Precooling Control Algorithm - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gayeski, N.; Armstrong, Peter; Alvira, M.

    2011-11-30

    KGS Buildings LLC (KGS) and Pacific Northwest National Laboratory (PNNL) have developed a simplified control algorithm and prototype low-lift chiller controller suitable for model-predictive control in a demonstration project of low-lift cooling. Low-lift cooling is a highly efficient cooling strategy conceived to enable low or net-zero energy buildings. A low-lift cooling system consists of a high efficiency low-lift chiller, radiant cooling, thermal storage, and model-predictive control to pre-cool thermal storage overnight on an optimal cooling rate trajectory. We call the properly integrated and controlled combination of these elements a low-lift cooling system (LLCS). This document is the final report formore » that project.« less

  1. A computer-aided approach to nonlinear control systhesis

    NASA Technical Reports Server (NTRS)

    Wie, Bong; Anthony, Tobin

    1988-01-01

    The major objective of this project is to develop a computer-aided approach to nonlinear stability analysis and nonlinear control system design. This goal is to be obtained by refining the describing function method as a synthesis tool for nonlinear control design. The interim report outlines the approach by this study to meet these goals including an introduction to the INteractive Controls Analysis (INCA) program which was instrumental in meeting these study objectives. A single-input describing function (SIDF) design methodology was developed in this study; coupled with the software constructed in this study, the results of this project provide a comprehensive tool for design and integration of nonlinear control systems.

  2. Controlled ecological life support system breadboard project, 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  3. On Services for Collaborative Project Management

    NASA Astrophysics Data System (ADS)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  4. Case-Control Study of Injury Intervention for Preschool Children in Henggang, Shenzhen.

    PubMed

    Wang, Hong; Liu, Yi-Xin; Deng, Wen-Jiao; Yang, Wei-Jian; Wang, Fang

    2015-10-01

    To explore effective interventions for child accidental injury prevention and to reduce the incidence of injury. Cluster random sampling method was adopted, and children in 19 kindergartens in Henggang, Shenzhen and their parents were selected as the objects of study. Nineteen kindergartens were randomly divided into intervention group and control group to carry out the injury intervention case-control study. Through a series of interventions, there were certain effects. After the end of the project, the injury incidence rates of the intervention group and the control group were 4.91%, 10.64%, and the difference was significant; the average costs of treatment for injuries of the intervention group and the control group were 168.4 Yuan and 206.8 Yuan, and the difference was statistically significant; compared with before the implementation of the project, the rate of various types of injuries after the end of the project declined, in which, the rate of mechanical injury, pet bites, accidental falls, burns, and traffic accidents decreased significantly. The differences were significant. Injury interventions can effectively prevent and control the occurrence of injury.

  5. Summer Principals'/Directors' Orientation Training Module.

    ERIC Educational Resources Information Center

    Mata, Robert L.; Garcia, Richard L.

    Intended to provide current or potential project principals/directors with the basic knowledge, skills, abilities, and sensitivities needed to manage a summer migrant school project in the local educational setting, this module provides instruction in the project management areas of planning, preparation, control, and termination. The module…

  6. CONTROL TECHNOLOGIES: PILOT- & FULL-SCALE TESTS

    EPA Science Inventory

    Two different project are to be supported in FY03. The first project is being conducted by the North Dakota Energy and Environmental Research Center (ND-EERC). This project consists of tests on coal-fired utility boilers to determine the effects of SCR catalysts and ammonia in...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Upchurch, J.L.

    In order to better meet the challenges associated with downsizing and because of the ongoing need to control costs and accelerate project development many companies are trying new and different strategies in managing projects. For the Seastar Project, Phillips adopted a total team approach. The goal of this approach was to develop a win/win attitude for all of the personnel (Phillips, Engineering Contractor and Equipment Vendors) involved in the project. By bringing all the personnel together and focusing on project success it was thought that costs could be better controlled and that the development schedule could be accelerated. The Seastarmore » Project is a two well subsea development located in Garden Banks Blocks 70 and 71 approximately 120 miles south of Cameron Louisiana. Phillips took over operatorship in 1992 and drilled Garden Banks Block 71 No. 2, which discovered 349 feet of net gas pay in April 1993. Following a successful drill stem test on GB 71 No. 2, drilling was started on an appraisal well and work began on a feasibility study to define development options.« less

  8. Is your organization project management savvy?

    PubMed

    Wolff, Pam

    2003-01-01

    As corporations struggle to gain better control and use of organizational resources in a rapidly changing business environment, they're finding that project management is an efficacious discipline for supporting strategic initiatives and achieving business goals. Successful project management requires an understanding of the business drivers, the organizational structure, the benefits of centralizing project management, and the factors that could impact performance.

  9. NASA Advanced Life Support Technology Testing and Development

    NASA Technical Reports Server (NTRS)

    Wheeler, Raymond M.

    2012-01-01

    Prior to 2010, NASA's advanced life support research and development was carried out primarily under the Exploration Life Support Project of NASA's Exploration Systems Mission Directorate. In 2011, the Exploration Life Support Project was merged with other projects covering Fire Prevention/Suppression, Radiation Protection, Advanced Environmental Monitoring and Control, and Thermal Control Systems. This consolidated project was called Life Support and Habitation Systems, which was managed under the Exploration Systems Mission Directorate. In 2012, NASA re-organized major directorates within the agency, which eliminated the Exploration Systems Mission Directorate and created the Office of the Chief Technologist (OCT). Life support research and development is currently conducted within the Office of the Chief Technologist, under the Next Generation Life Support Project, and within the Human Exploration Operation Missions Directorate under several Advanced Exploration System projects. These Advanced Exploration Systems projects include various themes of life support technology testing, including atmospheric management, water management, logistics and waste management, and habitation systems. Food crop testing is currently conducted as part of the Deep Space Habitation (DSH) project within the Advanced Exploration Systems Program. This testing is focused on growing salad crops that could supplement the crew's diet during near term missions.

  10. General risks for tunnelling projects: An overview

    NASA Astrophysics Data System (ADS)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  11. The Effect of STEM Learning through the Project of Designing Boat Model toward Student STEM Literacy

    NASA Astrophysics Data System (ADS)

    Tati, T.; Firman, H.; Riandi, R.

    2017-09-01

    STEM Learning focusses on development of STEM-literate society, the research about implementation of STEM learning to develope students’ STEM literacy is still limited. This study is aimed to examine the effect of implementation STEM learning through the project of designing boat model on students STEM literacy in energy topic. The method of this study was a quasi-experiment with non-randomized pretest-posttest control group design. There were two classes involved, the experiment class used Project Based Learning with STEM approach and control class used Project-Based Learning without STEM approach. A STEM Literacy test instrument was developed to measure students STEM literacy which consists of science literacy, mathematics literacy, and technology-engineering literacy. The analysis showed that there were significant differences on improvement science literacy, mathematics technology-engineering between experiment class and control class with effect size more than 0.8 (large effect). The difference of improvement of STEM literacy between experiment class and control class is caused by the existence of design engineering activity which required students to apply the knowledge from every field of STEM. The challenge that was faced in STEM learning through design engineering activity was how to give the students practice to integrate STEM field in solving the problems. In additional, most of the students gave positive response toward implementation of STEM learning through design boat model project.

  12. Artificial Intelligence Based Control Power Optimization on Tailless Aircraft. [ARMD Seedling Fund Phase I

    NASA Technical Reports Server (NTRS)

    Gern, Frank; Vicroy, Dan D.; Mulani, Sameer B.; Chhabra, Rupanshi; Kapania, Rakesh K.; Schetz, Joseph A.; Brown, Derrell; Princen, Norman H.

    2014-01-01

    Traditional methods of control allocation optimization have shown difficulties in exploiting the full potential of controlling large arrays of control devices on innovative air vehicles. Artificial neutral networks are inspired by biological nervous systems and neurocomputing has successfully been applied to a variety of complex optimization problems. This project investigates the potential of applying neurocomputing to the control allocation optimization problem of Hybrid Wing Body (HWB) aircraft concepts to minimize control power, hinge moments, and actuator forces, while keeping system weights within acceptable limits. The main objective of this project is to develop a proof-of-concept process suitable to demonstrate the potential of using neurocomputing for optimizing actuation power for aircraft featuring multiple independently actuated control surfaces. A Nastran aeroservoelastic finite element model is used to generate a learning database of hinge moment and actuation power characteristics for an array of flight conditions and control surface deflections. An artificial neural network incorporating a genetic algorithm then uses this training data to perform control allocation optimization for the investigated aircraft configuration. The phase I project showed that optimization results for the sum of required hinge moments are improved by more than 12% over the best Nastran solution by using the neural network optimization process.

  13. Manufacturing Technology.

    ERIC Educational Resources Information Center

    Liu, Yuan H.; And Others

    1994-01-01

    Includes "Integrating Coursework in Design with Industry Projects" (Liu); "A 'Perfect' Project--Computer Assisted Manufacturing, Fabrication, and Recycling All in One" (Anderson); and "Fluid Sensing and Control" (Hawkins, Hardy). (SK)

  14. Dynamic Information Management and Exchange for Command and Control Applications, Modelling and Enforcing Category-Based Access Control via Term Rewriting

    DTIC Science & Technology

    2015-03-01

    a hotel and a hospital. 2. Event handler for emergency policies (item 2 above): this has been implemented in two UG projects, one project developed a...Workshop on Logical and Se- mantic Frameworks, with Applications, Brasilia, Brazil , September 2014. Electronic Notes in Theoretical Computer Science (to...Brasilia, Brazil , September 2014, 2015. [3] S. Barker. The next 700 access control models or a unifying meta-model? In SACMAT 2009, 14th ACM Symposium on

  15. MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP) - JSC

    NASA Image and Video Library

    1975-07-17

    S75-28683 (17 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during the joint U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit. M.P. Frank, the American senior ASTP flight director, is seated at his console in the right foreground. He is watching the large television monitor which shows a view of the Soyuz spacecraft as seen from the Apollo spacecraft during rendezvous and docking maneuvers.

  16. Technical basis for implementation of remote reading capabilities for radiological control instruments at tank farms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PIERSON, R.M.

    1999-10-27

    This document provides the technical basis for use of remote reading capabilities with radiological control instruments at River Protection Project facilities. The purpose of this document is to evaluate applications of remote reading capabilities with Radiological Control instrumentation to allow continuous monitoring of radiation dose rates at River Protection Project (RPP) facilities. In addition this document provides a technical basis and implementing guidelines for remote monitoring of dose rates and their potential contribution to maintaining radiation exposures ALARA.

  17. Engineers and technicians in the control room at the Dryden Flight Research Center must constantly monitor critical operations and checks during research projects like NASA's hypersonic X-43A

    NASA Image and Video Library

    2004-01-24

    Engineers and technicians in the control room at the Dryden Flight Research Center must constantly monitor critical operations and checks during research projects like NASA's hypersonic X-43A. Visible in the photo, taken two days before the X-43's captive carry flight in January 2004, are [foreground to background]; Tony Kawano (Range Safety Officer), Brad Neal (Mission Controller), and Griffin Corpening (Test Conductor).

  18. Achievement of the World Bank loan project on schistosomiasis control (1992-2000) in Hubei province and the challenge in the future.

    PubMed

    Changsong, Sun; Binggui, Yu; Hongyi, Liao; Yuhai, Dai; Xu, Xingjian; Huiguo, Zhu; Yong, Jiang

    2002-05-01

    Since the World Bank provided a loan for control of schistosomiasis in China, started from 1992, with the objective of a reduction of prevalence and intensity of the infection both in humans and animals by 40%, through mass chemotherapy in areas of high prevalence, and selective chemotherapy in areas with medium and low endemicity together with focal mollusciciding, the objective of morbidity control of the project has been reached in Hubei Province.

  19. An interdisciplinary school project using a Nintendo Wii controller for measuring car speed

    NASA Astrophysics Data System (ADS)

    Hansen, Nils Kristian; Mitchell, James Robert

    2013-03-01

    This work examines the feasibility of employing a Nintendo Wii game controller for measuring car speed in an interdisciplinary school project. It discusses the physical characteristics of the controller and of vehicle headlights. It suggests how an experiment may be linked to topics in mathematics, statistics, physics and computer science. An algorithm for calculating speed from repeated recordings of car headlights is provided. Finally the results of repeated experiments with an approaching car are provided.

  20. Export Control Requirements for Tritium Processing Design and R&D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollis, William Kirk; Maynard, Sarah-Jane Wadsworth

    This document will address requirements of export control associated with tritium plant design and processes. Los Alamos National Laboratory has been working in the area of tritium plant system design and research and development (R&D) since the early 1970’s at the Tritium Systems Test Assembly (TSTA). This work has continued to the current date with projects associated with the ITER project and other Office of Science Fusion Energy Science (OS-FES) funded programs. ITER is currently the highest funding area for the DOE OS-FES. Although export control issues have been integrated into these projects in the past a general guidance documentmore » has not been available for reference in this area. To address concerns with currently funded tritium plant programs and assist future projects for FES, this document will identify the key reference documents and specific sections within related to tritium research. Guidance as to the application of these sections will be discussed with specific detail to publications and work with foreign nationals.« less

  1. Export Control Requirements for Tritium Processing Design and R&D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollis, William Kirk; Maynard, Sarah-Jane Wadsworth

    2015-10-30

    This document will address requirements of export control associated with tritium plant design and processes. Los Alamos National Laboratory has been working in the area of tritium plant system design and research and development (R&D) since the early 1970’s at the Tritium Systems Test Assembly (TSTA). This work has continued to the current date with projects associated with the ITER project and other Office of Science Fusion Energy Science (OS-FES) funded programs. ITER is currently the highest funding area for the DOE OS-FES. Although export control issues have been integrated into these projects in the past a general guidance documentmore » has not been available for reference in this area. To address concerns with currently funded tritium plant programs and assist future projects for FES, this document will identify the key reference documents and specific sections within related to tritium research. Guidance as to the application of these sections will be discussed with specific detail to publications and work with foreign nationals.« less

  2. Evaluating local policy adoption campaigns in California: Tobacco Retail License (TRL) adoption.

    PubMed

    Satterlund, Travis D; Treiber, Jeanette; Haun, Sue; Cassady, Diana

    2014-06-01

    As part of its state-wide "denormalization" campaign, the California Tobacco Control Program has funded local tobacco control projects to secure tobacco retail licenses (TRLs) in their communities. TRL policies generate funding by requiring tobacco retailers within a jurisdiction to obtain a license, which is in addition to the state license that tobacco retailers are legally required to purchase to sell tobacco products. The funding provided by TRLs enables local law enforcement to carry out inspection and enforcement operations. This paper examines the unique processes by which local project campaigns attempt to get TRL policies adopted in communities across the State of California. Twenty-two local projects submitted final evaluation reports pertaining to the adoption of TRLs, and the reports from these projects form the basis of the analysis. Successful campaigns tended to include the following strategies: (1) determining policy readiness; (2) gathering local data; (3) identifying and working with a "champion"; (4) building relationships with local law enforcement agencies and decision makers; and (5) educating community and decision makers. The major challenges faced by local projects included budget cuts and staffing issues, concern about creating an unfavorable environment for business by imposing more regulations and fees, and complaints about using law enforcement resources for tobacco control in light of more "pressing" public safety issues. These challenges proved difficult for local projects to overcome, and also highlight the need for projects to create and carry out strong but flexible tactical plans that incorporate the aforementioned strategies.

  3. NASA advanced design program. Design and analysis of a radio-controlled flying wing aircraft

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The main challenge of this project was to design an aircraft that will achieve stability while flying without a horizontal tail. The project focused on both the design, analysis and construction of a remotely piloted, elliptical shaped flying wing. The design team was composed of four sub-groups each of which dealt with the different aspects of the design, namely aerodynamics, stability and control, propulsion, and structures. Each member of the team initially researched the background information pertaining to specific facets of the project. Since previous work on this topic was limited, most of the focus of the project was directed towards developing an understanding of the natural instability of the aircraft. Once the design team entered the conceptual stage of the project, a series of compromises had to be made to satisfy the unique requirements of each sub-group. As a result of the numerous calculations and iterations necessary, computers were utilized extensively. In order to visualize the design and layout of the wing, engines and control surfaces, a solid modeling package was used to evaluate optimum design placements. When the design was finalized, construction began with the help of all the members of the project team. The nature of the carbon composite construction process demanded long hours of manual labor. The assembly of the engine systems also required precision hand work. The final product of this project is the Elang, a one-of-a-kind remotely piloted aircraft of composite construction powered by two ducted fan engines.

  4. Project Ares 3

    NASA Technical Reports Server (NTRS)

    Raymer, Dan; Russell, Phyllis; Fox, Tim; Meyers, Doug; Lovric, Steven; Grabow, Robert; Epp, Manfred; Wynn, Warren, Jr.; Mako, Zoltan; Linzner, Gunther

    1992-01-01

    The mission of Project Ares is to design and fabricate an Earth prototype, autonomous flying rover capable of flying on the Martian surface. The project was awarded to California State University, Northridge (CSUN) in 1989 where an in-depth paper study was completed. The second year's group, Project Ares 2, designed and fabricated a full-scale flight demonstration aircraft. Project Ares 3, the third and final group, is responsible for propulsion system design and installation, controls and instrumentation, and high altitude testing. The propulsion system consists of a motor and its power supply, geartrain, and propeller. The motor is a four-brush DC motor powered by a 50-V NiCd battery supply. A pulley and belt arrangement is used for the geartrain and includes light weight, low temperature materials. The propeller is constructed from composite materials which ensures high strength and light weight, and is specifically developed to provide thrust at extremely high altitudes. The aircraft is controlled with a ground-based radio control system and an autopilot which will activate in the event that the control signal is lost. A transponder is used to maintain radar contact for ground tracking purposes. The aircraft possesses a small, onboard computer for collecting and storing flight data. To safeguard the possibility of computer failure, all flight data is transmitted to a ground station via a telemetry system. An initial, unpowered, low-level test flight was completed in August of 1991. Testing of systems integration in the second low-level test flight resulted in loss of elevator control which caused considerable damage on landing. Complete failure analysis and repairs are scheduled for September of 1992.

  5. JV Task 98 - Controlling Mercury Emissions for Utilities Firing Lignites from North America

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Benson

    2007-06-15

    This project compiled and summarized the findings and conclusions of research, development, and demonstration projects on controlling mercury from lignite coals. A significant amount of work has been conducted since 1994 on mercury in lignite, mercury measurement in flue gases, sorbent, sorbent enhancement additives, oxidation agent development, and full-scale demonstration of mercury control technologies. This report is focused on providing the lignite industry with an understanding of mercury issues associated with the combustion of lignite, as well as providing vital information on the methods to control mercury emissions in coal-fired power plants.

  6. INL Control System Situational Awareness Technology Annual Report 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gordon Rueff; Bryce Wheeler; Todd Vollmer

    The overall goal of this project is to develop an interoperable set of tools to provide a comprehensive, consistent implementation of cyber security and overall situational awareness of control and sensor network implementations. The operation and interoperability of these tools will fill voids in current technological offerings and address issues that remain an impediment to the security of control systems. This report provides an FY 2012 update on the Sophia, Mesh Mapper, Intelligent Cyber Sensor, and Data Fusion projects with respect to the year-two tasks and annual reporting requirements of the INL Control System Situational Awareness Technology report (July 2010).

  7. Advanced automation of a prototypic thermal control system for Space Station

    NASA Technical Reports Server (NTRS)

    Dominick, Jeff

    1990-01-01

    Viewgraphs on an advanced automation of a prototypic thermal control system for space station are presented. The Thermal Expert System (TEXSYS) was initiated in 1986 as a cooperative project between ARC and JCS as a way to leverage on-going work at both centers. JSC contributed Thermal Control System (TCS) hardware and control software, TCS operational expertise, and integration expertise. ARC contributed expert system and display expertise. The first years of the project were dedicated to parallel development of expert system tools, displays, interface software, and TCS technology and procedures by a total of four organizations.

  8. Advanced automation in space shuttle mission control

    NASA Technical Reports Server (NTRS)

    Heindel, Troy A.; Rasmussen, Arthur N.; Mcfarland, Robert Z.

    1991-01-01

    The Real Time Data System (RTDS) Project was undertaken in 1987 to introduce new concepts and technologies for advanced automation into the Mission Control Center environment at NASA's Johnson Space Center. The project's emphasis is on producing advanced near-operational prototype systems that are developed using a rapid, interactive method and are used by flight controllers during actual Shuttle missions. In most cases the prototype applications have been of such quality and utility that they have been converted to production status. A key ingredient has been an integrated team of software engineers and flight controllers working together to quickly evolve the demonstration systems.

  9. Equatorial Precession in the Control Software of the Ka-Band Object Observation and Monitoring Experiment

    NASA Technical Reports Server (NTRS)

    Jakeman, Hali L.

    2013-01-01

    The Ka-Band Object Observation and Monitoring, or KaBOOM, project is designed mainly to track and characterize near Earth objects. However, a smaller goal of the project would be to monitor pulsars and study their radio frequency signals for use as a clock in interstellar travel. The use of pulsars and their timing accuracy has been studied for decades, but never in the Ka-band of the radio frequency spectrum. In order to begin the use of KaBOOM for this research, the control systems need to be analyzed to ensure its capability. Flaws in the control documentation leave it unclear as to whether the control software processes coordinates from the J200 epoch. This experiment will examine the control software of the Intertronic 12m antennas used for the KaBOOM project and detail its capabilities in its "equatorial mode." The antennas will be pointed at 4 chosen points in the sky on several days while probing the virtual azimuth and elevation (horizon coordinate) registers. The input right ascension and declination coordinates will then be converted separately from the control software to horizontal coordinates and compared, thus determining the ability of the control software to process equatorial coordinates.

  10. Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schnabel, Claus

    Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Boschmore » in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.« less

  11. Auditory cortex controls sound-driven innate defense behaviour through corticofugal projections to inferior colliculus.

    PubMed

    Xiong, Xiaorui R; Liang, Feixue; Zingg, Brian; Ji, Xu-ying; Ibrahim, Leena A; Tao, Huizhong W; Zhang, Li I

    2015-06-11

    Defense against environmental threats is essential for animal survival. However, the neural circuits responsible for transforming unconditioned sensory stimuli and generating defensive behaviours remain largely unclear. Here, we show that corticofugal neurons in the auditory cortex (ACx) targeting the inferior colliculus (IC) mediate an innate, sound-induced flight behaviour. Optogenetic activation of these neurons, or their projection terminals in the IC, is sufficient for initiating flight responses, while the inhibition of these projections reduces sound-induced flight responses. Corticocollicular axons monosynaptically innervate neurons in the cortex of the IC (ICx), and optogenetic activation of the projections from the ICx to the dorsal periaqueductal gray is sufficient for provoking flight behaviours. Our results suggest that ACx can both amplify innate acoustic-motor responses and directly drive flight behaviours in the absence of sound input through corticocollicular projections to ICx. Such corticofugal control may be a general feature of innate defense circuits across sensory modalities.

  12. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  13. A Mobile Satellite Experiment (MSAT-X) network definition

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Yan, Tsun-Yee

    1990-01-01

    The network architecture development of the Mobile Satellite Experiment (MSAT-X) project for the past few years is described. The results and findings of the network research activities carried out under the MSAT-X project are summarized. A framework is presented upon which the Mobile Satellite Systems (MSSs) operator can design a commercial network. A sample network configuration and its capability are also included under the projected scenario. The Communication Interconnection aspect of the MSAT-X network is discussed. In the MSAT-X network structure two basic protocols are presented: the channel access protocol, and the link connection protocol. The error-control techniques used in the MSAT-X project and the packet structure are also discussed. A description of two testbeds developed for experimentally simulating the channel access protocol and link control protocol, respectively, is presented. A sample network configuration and some future network activities of the MSAT-X project are also presented.

  14. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Shore Protection Projects. 203.49 Section 203.49 Navigation and Navigable Waters CORPS OF ENGINEERS... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Protection Projects. (a) Authority. The Chief of Engineers is authorized to rehabilitate any Federally...

  15. 76 FR 5188 - Notice of Proposed Information Collection: Comment Request; Application for Multifamily Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Information Collection: Comment Request; Application for Multifamily Project Mortgage Insurance AGENCY: Office... Service (1-800-877-8339). FOR FURTHER INFORMATION CONTACT: Joyce Allen, Director, Office of Multifamily...: Application for Multifamily Project Mortgage Insurance. OMB Control Number, if applicable: 2502-0029...

  16. 77 FR 19016 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... the use of automated collection techniques or other forms of information technology. Written comments...

  17. 77 FR 10750 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... through the use of automated collection techniques or other forms of information technology. Written...

  18. How Is Open Source Special?

    ERIC Educational Resources Information Center

    Kapor, Mitchell

    2005-01-01

    Open source software projects involve the production of goods, but in software projects, the "goods" consist of information. The open source model is an alternative to the conventional centralized, command-and-control way in which things are usually made. In contrast, open source projects are genuinely decentralized and transparent. Transparent…

  19. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Shore Protection Projects. 203.49 Section 203.49 Navigation and Navigable Waters CORPS OF ENGINEERS... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Protection Projects. (a) Authority. The Chief of Engineers is authorized to rehabilitate any Federally...

  20. 75 FR 30846 - Notice of Proposed Information Collection: Comment Request; Multifamily Project Monthly...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5380-N-24] Notice of Proposed Information Collection: Comment Request; Multifamily Project Monthly Accounting Reports AGENCY: Office of the... information: Title of Proposal: Multifamily Project Monthly Accounting Reports. OMB Control Number, if...

  1. Bioregenerative system

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The design course is an eight semester credit multi-disciplinary engineering design course taught primarily to Engineering Science, Aerospace, Electrical and Mechanical Engineering seniors. This year the course project involved the design of the three interrelated loops: atmospheric, liquid nutrient and solid waste management, associated with growing higher plants to support man during long-term space missions. The project is complementary to the NASA Kennedy Space Center Controlled Environmental Life Support System (CELSS) project. The first semester the class worked on a preliminary design for a complete system. This effort included means for monitoring and control of composition, temperature, flow rate, etc., for the atmosphere and liquid nutrient solution; disease and contaminant monitoring and control; plant mechanical support, propagation and harvesting; solid and liquid waste recycling; and system maintenance and refurbishing. The project has significant biological, mechanical, electrical and Al/Robotics aspects. The second semester a small number of subsystems or components, identified as important and interesting during the first semester, were selected for detail design, fabrication, and testing. The class was supported by close cooperation with The Kennedy Space Center and by two teaching assistants. The availability of a dedicated, well equipped project room greatly enhanced the communication and team spirit of the class.

  2. Descending motor pathways and the spinal motor system - Limbic and non-limbic components

    NASA Technical Reports Server (NTRS)

    Holstege, Gert

    1991-01-01

    Research on descending motor pathways to caudal brainstem and spinal cord in the spinal motor system is reviewed. Particular attention is given to somatic and autonomic motoneurons in the spinal cord and brainstem, local projections to motoneurons, bulbospinal interneurons projecting to motoneurons, descending pathways of somatic motor control systems, and descending pathways involved in limbic motor control systems.

  3. OPUS: Optimal Projection for Uncertain Systems. Volume 1

    DTIC Science & Technology

    1991-09-01

    unifiedI control- design methodology that directly addresses these technology issues. 1 In particular, optimal projection theory addresses the need for...effects, and limited identification accuracy in a 1-g environment. The principal contribution of OPUS is a unified design methodology that...characterizing solutions to constrained control- design problems. Transforming OPUS into a practi- cal design methodology requires the development of

  4. Who Should Control the Behavior of Minors? A Focus on Attendance, Association, and Appearance. The LegiSchool Project. A Town Hall Meeting.

    ERIC Educational Resources Information Center

    Futernick, Ken; Arnstine, Barbara; Hodson, Timothy A.

    The LegiSchool Project, a collaboration between the California State University, Sacramento, and the California State Legislature, scheduled a town-hall meeting to discuss areas in which adults feel they must control the behavior of young people. Materials for educating meeting participants are contained in this report. Participants, which…

  5. 75 FR 9207 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... the purchase of a GrundFos SQ Flex 6 SQF- 2 solar powered submersible pump system with control and solar panels (pump system) manufactured in Denmark by GrundFos. This is a project specific waiver and... powered submersible pump system with control and solar panels (pump system) manufactured in Denmark by...

  6. White Paper for Virtual Control Room

    NASA Technical Reports Server (NTRS)

    Little, William; Tully-Hanson, Benjamin

    2015-01-01

    The Virtual Control Room (VCR) Proof of Concept (PoC) project is the result of an award given by the Fourth Annual NASA T&I Labs Challenge Project Call. This paper will outline the work done over the award period to build and enhance the capabilities of the Augmented/Virtual Reality (AVR) Lab at NASA's Kennedy Space Center (KSC) to create the VCR.

  7. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    ERIC Educational Resources Information Center

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  8. Redesign of a Flood Control Project by Citizen Initiative

    Treesearch

    Bev Ortiz

    1989-01-01

    This paper describes the process used to redesign a flood control project on three creeks in central Contra Costa County, California, about 15 miles east of San Francisco. Involved was door-to-door organizing to form a neighborhood group which in turn used a county-appointed committee, a city-appointed committee, a State grant and a private consultant working with the...

  9. Title IV Quality Control Project, Stage II. Management Option II: Delivery System Quality Improvements.

    ERIC Educational Resources Information Center

    Advanced Technology, Inc., Reston, VA.

    Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…

  10. Evaluation Realities or How I Learned to Love "The Standards" While Evaluating a Computer Assisted Instruction Project.

    ERIC Educational Resources Information Center

    Payne, David A.

    This case study presents a narrative summary of the evaluation of a two semester computer assisted instruction (CAI) project in an all minority high school. Use of PLATO software with Control Data microcomputers brought about modest achievement advantages, higher internal locus of control, more positive attitudes toward school and specific course…

  11. Activate/Inhibit KGCS Gateway via Master Console EIC Pad-B Display

    NASA Technical Reports Server (NTRS)

    Ferreira, Pedro Henrique

    2014-01-01

    My internship consisted of two major projects for the Launch Control System.The purpose of the first project was to implement the Application Control Language (ACL) to Activate Data Acquisition (ADA) and to Inhibit Data Acquisition (IDA) the Kennedy Ground Control Sub-Systems (KGCS) Gateway, to update existing Pad-B End Item Control (EIC) Display to program the ADA and IDA buttons with new ACL, and to test and release the ACL Display.The second project consisted of unit testing all of the Application Services Framework (ASF) by March 21st. The XmlFileReader was unit tested and reached 100 coverage. The XmlFileReader class is used to grab information from XML files and use them to initialize elements in the other framework elements by using the Xerces C++ XML Parser; which is open source commercial off the shelf software. The ScriptThread was also tested. ScriptThread manages the creation and activation of script threads. A large amount of the time was used in initializing the environment and learning how to set up unit tests and getting familiar with the specific segments of the project that were assigned to us.

  12. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  13. Stereo optical guidance system for control of industrial robots

    NASA Technical Reports Server (NTRS)

    Powell, Bradley W. (Inventor); Rodgers, Mike H. (Inventor)

    1992-01-01

    A device for the generation of basic electrical signals which are supplied to a computerized processing complex for the operation of industrial robots. The system includes a stereo mirror arrangement for the projection of views from opposite sides of a visible indicia formed on a workpiece. The views are projected onto independent halves of the retina of a single camera. The camera retina is of the CCD (charge-coupled-device) type and is therefore capable of providing signals in response to the image projected thereupon. These signals are then processed for control of industrial robots or similar devices.

  14. Design of an AdvancedTCA board management controller (IPMC)

    NASA Astrophysics Data System (ADS)

    Mendez, J.; Bobillier, V.; Haas, S.; Joos, M.; Mico, S.; Vasey, F.

    2017-03-01

    The AdvancedTCA (ATCA) standard has been selected as the hardware platform for the upgrade of the back-end electronics of the CMS and ATLAS experiments of the Large Hadron Collider (LHC) . In this context, the electronic systems for experiments group at CERN is running a project to evaluate, specify, design and support xTCA equipment. As part of this project, an Intelligent Platform Management Controller (IPMC) for ATCA blades, based on a commercial solution, has been designed to be used on existing and future ATCA blades. This paper reports on the status of this project presenting the hardware and software developments.

  15. 77 FR 30516 - Tribally Controlled Postsecondary Career and Technical Institutions Program; Final Waivers and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ...For 60-month projects funded in fiscal year (FY) 2007 under the Tribally Controlled Postsecondary Career and Technical Institutions Program (TCPCTIP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current TCPCTIP grantees through FY 2013, or longer, if Congress continues to appropriate funds under the existing TCPCTIP program authority. This action will enable the two current TCPCTIP grantees to seek continuation awards in FY 2012 for their current projects, and we will not announce a new TCPCTIP competition in FY 2012.

  16. 76 FR 2674 - Proposed Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... the project. Additionally, PIRCs conducting experimental design studies experienced logistical challenges associated with establishing treatment and control groups. An additional year of funding would...

  17. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  18. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Dudley, Stephanie R. B.; Marsh, Angela L.

    2014-01-01

    With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

  19. A Data Management System for Multi-Phase Case-Control Studies

    PubMed Central

    Gibeau, Joanne M.; Steinfeldt, Lois C.; Stine, Mark J.; Tullis, Katherine V.; Lynch, H. Keith

    1983-01-01

    The design of a computerized system for the management of data in multi-phase epidemiologic case-control studies is described. Typical study phases include case-control selection, abstracting of data from medical records, and interview of study subjects or next of kin. In consultation with project personnel, requirements for the system were established: integration of data from all study phases into one data base, accurate follow-up of subjects through the study, sophisticated data editing capabilities, ready accessibility of specified programs to project personnel, and generation of current status and exception reports for project managment. SIR (Scientific Information Retrieval), a commercially available data base management system, was selected as the foundation of this system. The system forms a comprehensive data management system applicable to many types of public health research studies.

  20. Cascaded Microinverter PV System for Reduced Cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellus, Daniel R.; Ely, Jeffrey A.

    2013-04-29

    In this project, a team led by Delphi will develop and demonstrate a novel cascaded photovoltaic (PV) inverter architecture using advanced components. This approach will reduce the cost and improve the performance of medium and large-sized PV systems. The overall project objective is to develop, build, and test a modular 11-level cascaded three-phase inverter building block for photovoltaic applications and to develop and analyze the associated commercialization plan. The system will be designed to utilize photovoltaic panels and will supply power to the electric grid at 208 VAC, 60 Hz 3-phase. With the proposed topology, three inverters, each with anmore » embedded controller, will monitor and control each of the cascade sections, reducing costs associated with extra control boards. This report details the final disposition on this project.« less

  1. Gestion de stockage d'energie thermique d'un parc de chauffe-eaux par une commande a champ moyen

    NASA Astrophysics Data System (ADS)

    Bourdel, Benoit

    In today's energy transition, smart grids and electrical load control are very active research fields. This master's thesis is an offshoot of the SmartDesc project which aims at using energy storage capability of electric household appliances, such as water heaters and electric heaters to mitigate the fluctuations of system loads and renewable generation. The smartDESC project aims at demonstrating that the mean field game theory (MFG), as new mathematical theory, can be used to convert and control water heaters (and possibly space heater) into smart thermal capacities. Thus, a set of "modules" has been developed. These modules are used to generate the optimal control and locally interpret it, to simulate the water-heater thermophysics or water draw event, or to virtualize a telecommunication mesh network. The different aspects of the project have been first studied and developed separately. During the course of this master's research, the modules have been integrated, tested, interfaced and tuned in a common simulator. This simulator is designed to make complete electrical network simulations with a multi-scale approach (from individual water heater to global electric load and production). Firstly, the modules are precisely described theoretically and practically. Then, different types of control are applied to an uniform population of houses fitted with water heaters and controllers. The results of these controls are analysed and compared in order to understand their strengths and weaknesses. Finally, a study was conducted to analyse the resilience of a mean field control. This report demonstrates that mean field game theory in coordination with a system level aggregate model based optimization program, is able to effectively control a large population of water heaters to smooth the overall electrical load. This control offers good resilience to unforeseen circumstances that can disrupt the network. It is also demonstrated that a mean field control is able to absorb fluctuations due to wind power production. Thus, by reducing the variability of the residential sector's electrical charge, the mean field control plays a role in increasing power system stability in the face of high levels of renewable energy penetration. The next stage of smartDESC project is now to set up an intelligent electric water heater prototype. This prototype, in progress since January 2016 at Ecole Polytechnique in Montreal, is aimed at proving concretely the theories developed in the project.

  2. [On-site quality control of acupuncture randomized controlled trial: design of content and checklist of quality control based on PICOST].

    PubMed

    Li, Hong-Jiao; He, Li-Yun; Liu, Zhi-Shun; Sun, Ya-Nan; Yan, Shi-Yan; Liu, Jia; Zhao, Ye; Liu, Bao-Yan

    2014-02-01

    To effectively guarantee quality of randomized controlld trial (RCT) of acupuncture and develop reasonable content and checklist of on-site quality control, influencing factors on quality of acupuncture RCT are analyzed and scientificity of quality control content and feasibility of on-site manipulation are put into overall consideration. Based on content and checklist of on-site quality control in National 11th Five-Year Plan Project Optimization of Comprehensive Treatment Plan for TCM in Prevention and Treatment of Serious Disease and Clinical Assessment on Generic Technology and Quality Control Research, it is proposed that on-site quality control of acupuncture RCT should be conducted with PICOST (patient, intervention, comparison, out come, site and time) as core, especially on quality control of interveners' skills and outcome assessment of blinding, and checklist of on-site quality control is developed to provide references for undertaking groups of the project.

  3. A homotopy algorithm for digital optimal projection control GASD-HADOC

    NASA Technical Reports Server (NTRS)

    Collins, Emmanuel G., Jr.; Richter, Stephen; Davis, Lawrence D.

    1993-01-01

    The linear-quadratic-gaussian (LQG) compensator was developed to facilitate the design of control laws for multi-input, multi-output (MIMO) systems. The compensator is computed by solving two algebraic equations for which standard closed-loop solutions exist. Unfortunately, the minimal dimension of an LQG compensator is almost always equal to the dimension of the plant and can thus often violate practical implementation constraints on controller order. This deficiency is especially highlighted when considering control-design for high-order systems such as flexible space structures. This deficiency motivated the development of techniques that enable the design of optimal controllers whose dimension is less than that of the design plant. A homotopy approach based on the optimal projection equations that characterize the necessary conditions for optimal reduced-order control. Homotopy algorithms have global convergence properties and hence do not require that the initializing reduced-order controller be close to the optimal reduced-order controller to guarantee convergence. However, the homotopy algorithm previously developed for solving the optimal projection equations has sublinear convergence properties and the convergence slows at higher authority levels and may fail. A new homotopy algorithm for synthesizing optimal reduced-order controllers for discrete-time systems is described. Unlike the previous homotopy approach, the new algorithm is a gradient-based, parameter optimization formulation and was implemented in MATLAB. The results reported may offer the foundation for a reliable approach to optimal, reduced-order controller design.

  4. Flight Test of an Adaptive Controller and Simulated Failure/Damage on the NASA NF-15B

    NASA Technical Reports Server (NTRS)

    Buschbacher, Mark; Maliska, Heather

    2006-01-01

    The method of flight-testing the Intelligent Flight Control System (IFCS) Second Generation (Gen-2) project on the NASA NF-15B is herein described. The Gen-2 project objective includes flight-testing a dynamic inversion controller augmented by a direct adaptive neural network to demonstrate performance improvements in the presence of simulated failure/damage. The Gen-2 objectives as implemented on the NASA NF-15B created challenges for software design, structural loading limitations, and flight test operations. Simulated failure/damage is introduced by modifying control surface commands, therefore requiring structural loads measurements. Flight-testing began with the validation of a structural loads model. Flight-testing of the Gen-2 controller continued, using test maneuvers designed in a sequenced approach. Success would clear the new controller with respect to dynamic response, simulated failure/damage, and with adaptation on and off. A handling qualities evaluation was conducted on the capability of the Gen-2 controller to restore aircraft response in the presence of a simulated failure/damage. Control room monitoring of loads sensors, flight dynamics, and controller adaptation, in addition to postflight data comparison to the simulation, ensured a safe methodology of buildup testing. Flight-testing continued without major incident to accomplish the project objectives, successfully uncovering strengths and weaknesses of the Gen-2 control approach in flight.

  5. Device Oriented Project Controller

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalesio, Leo; Kraimer, Martin

    2013-11-20

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions havemore » been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.« less

  6. Mechanical Engineering Senior Design Project Final Presentations | College

    Science.gov Websites

    Mechanical Engineering Senior Design Project Final Presentations December 7, 2015 Mechanical Engineering On Wednesday, Dec. 9th, the mechanical engineering senior design project final presentations will be made in and Steven Keller Objective: Design a temperature controlled unit that would cool and maintain a

  7. 75 FR 72829 - Los Alamos Historical Document Retrieval and Assessment (LAHDRA) Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... Historical Document Retrieval and Assessment (LAHDRA) Project The Centers for Disease Control and Prevention... release of the Final Report of the Los Alamos Historical Document Retrieval and Assessment (LAHDRA)Project... information about historical chemical or radionuclide releases from facilities at the Los Alamos National...

  8. Chapter 7 - Mapping potential vegetation type for the LANDFIRE Prototype Project

    Treesearch

    Tracey S. Frescino; Matthew G. Rollins

    2006-01-01

    Mapped potential vegetation functioned as a key component in the Landscape Fire and Resource Management Planning Tools Prototype Project (LANDFIRE Prototype Project). Disturbance regimes, vegetation response and succession, and wildland fuel dynamics across landscapes are controlled by patterns of the environmental factors (biophysical settings) that entrain the...

  9. Implementing Project Based Learning in Computer Classroom

    ERIC Educational Resources Information Center

    Asan, Askin; Haliloglu, Zeynep

    2005-01-01

    Project-based learning offers the opportunity to apply theoretical and practical knowledge, and to develop the student's group working, and collaboration skills. In this paper we presented a design of effective computer class that implements the well-known and highly accepted project-based learning paradigm. A pre-test/post-test control group…

  10. 78 FR 49758 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... collection techniques or other forms of information technology. Written comments should be received within 60...

  11. 77 FR 58394 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will publish periodic summaries of proposed projects. To request more information on the proposed projects or... collection techniques or other forms of information technology. Written comments should be received within 60...

  12. Project Invest: Instructional Network for Vocational Education and Specialized Training.

    ERIC Educational Resources Information Center

    Borba, Craig E.; Guzicki, Joseph A.

    1980-01-01

    An evaluation of the effects on attendance of Project Invest, a program providing career education to special education students, was undertaken with 20 students participating in the project and a control group of 20 nonparticipating students. Results showed a significant increase in attendance among the experimental Ss. (PHR)

  13. The GenTechnique Project: Developing an Open Environment for Learning Molecular Genetics.

    ERIC Educational Resources Information Center

    Calza, R. E.; Meade, J. T.

    1998-01-01

    The GenTechnique project at Washington State University uses a networked learning environment for molecular genetics learning. The project is developing courseware featuring animation, hyper-link controls, and interactive self-assessment exercises focusing on fundamental concepts. The first pilot course featured a Web-based module on DNA…

  14. 40 CFR 51.114 - Emissions data and projections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Emissions data and projections. 51.114... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.114 Emissions data and projections. (a) Except for lead, each plan must contain a detailed inventory of...

  15. 40 CFR 51.114 - Emissions data and projections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Emissions data and projections. 51.114... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.114 Emissions data and projections. (a) Except for lead, each plan must contain a detailed inventory of...

  16. Task Description Language

    NASA Technical Reports Server (NTRS)

    Simmons, Reid; Apfelbaum, David

    2005-01-01

    Task Description Language (TDL) is an extension of the C++ programming language that enables programmers to quickly and easily write complex, concurrent computer programs for controlling real-time autonomous systems, including robots and spacecraft. TDL is based on earlier work (circa 1984 through 1989) on the Task Control Architecture (TCA). TDL provides syntactic support for hierarchical task-level control functions, including task decomposition, synchronization, execution monitoring, and exception handling. A Java-language-based compiler transforms TDL programs into pure C++ code that includes calls to a platform-independent task-control-management (TCM) library. TDL has been used to control and coordinate multiple heterogeneous robots in projects sponsored by NASA and the Defense Advanced Research Projects Agency (DARPA). It has also been used in Brazil to control an autonomous airship and in Canada to control a robotic manipulator.

  17. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  18. Impact of the Cancer Prevention and Control Research Network

    PubMed Central

    Ribisl, Kurt M.; Fernandez, Maria E.; Friedman, Daniela B.; Hannon, Peggy; Leeman, Jennifer; Moore, Alexis; Olson, Lindsay; Ory, Marcia; Risendal, Betsy; Sheble, Laura; Taylor, Vicky; Williams, Rebecca; Weiner, Bryan J.

    2018-01-01

    The Cancer Prevention and Control Research Network (CPCRN) is a thematic network dedicated to accelerating the adoption of evidence-based cancer prevention and control practices in communities by advancing dissemination and implementation science. Funded by the Centers for Disease Control and Prevention and National Cancer Institute, CPCRN has operated at two levels: Each participating Network Center conducts research projects with primarily local partners as well as multicenter collaborative research projects with state and national partners. Through multicenter collaboration, thematic networks leverage the expertise, resources, and partnerships of participating centers to conduct research projects collectively that might not be feasible individually. Although multicenter collaboration often is advocated, it is challenging to promote and assess. Using bibliometric network analysis and other graphical methods, this paper describes CPCRN’s multicenter publication progression from 2004 to 2014. Searching PubMed, Scopus, and Web of Science in 2014 identified 249 peer-reviewed CPCRN publications involving two or more centers out of 6,534 total. The research and public health impact of these multicenter collaborative projects initiated by CPCRN during that 10-year period were then examined. CPCRN established numerous workgroups around topics such as: 2-1-1, training and technical assistance, colorectal cancer control, federally qualified health centers, cancer survivorship, and human papillomavirus. The paper discusses the challenges that arise in promoting multicenter collaboration and the strategies that CPCRN uses to address those challenges. The lessons learned should broadly interest those seeking to promote multisite collaboration to address public health problems, such as cancer prevention and control. PMID:28215371

  19. Can performance on summative evaluation of wax-added dental anatomy projects be better predicted from the combination of supervised and unsupervised practice than from supervised practice alone?

    PubMed

    Radjaeipour, G; Chambers, D W; Geissberger, M

    2016-11-01

    The study explored the effects of adding student-directed projects in pre-clinical dental anatomy laboratory on improving the predictability of students' eventual performance on summative evaluation exercises, given the presence of intervening faculty-controlled, in-class practice. All students from four consecutive classes (n = 555) completed wax-added home projects (HP), spending as much or as little time as desired and receiving no faculty feedback; followed by similar laboratory projects (LP) with time limits and feedback; and then summative practical projects (PP) in a timed format but without faculty feedback. Path analysis was used to assess if the student-directed HP had any effect over and above the laboratory projects. Average scores were HP = 0.785 (SD = 0.089); LP = 0.736 (SD = 0.092); and PP = 0.743 (SD = 0.108). Path analysis was applied to show the effects of including a student-controlled home practice exercise on summative exercise performance. HP contributed 57% direct effect and 37% mediated effect through the LP condition. Student-directed home practice provided a measureable improvement in ability to predict eventual performance in summative test cases over and above the predictive contribution of intervening faculty-controlled practice conditions. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  20. Intermediate Experimental Vehicle (IXV): Avionics and Software of the ESA Reentry Demonstrator

    NASA Astrophysics Data System (ADS)

    Malucchi, Giovanni; Dussy, Stephane; Camuffo, Fabrizio

    2012-08-01

    The IXV project is conceived as a technology platform that would perform the step forward with respect to the Atmospheric Reentry Demonstrator (ARD), by increasing the system maneuverability and verifying the critical technology performances against a wider re- entry corridor.The main objective is to design, develop and to perform an in-flight verification of an autonomous lifting and aerodynamically controlled (by a combined use of thrusters and aerodynamic surfaces) reentry system.The project also includes the verification and experimentation of a set of critical reentry technologies and disciplines:Thermal Protection System (TPS), for verification and characterization of thermal protection technologies in representative operational environment;Aerodynamics - Aerthermodynamics (AED-A TD), for understanding and validation of aerodynamics and aerothermodyamics phenomena with improvement of design tools;Guidance, Navigation and Control (GNC), for verification of guidance, navigation and control techniques in representative operational environment (i.e. reentry from Low Earth Orbit);Flight dynamics, to update and validate the vehicle model during actual flight, focused on stability and control derivatives.The above activities are being performed through the implementation of a strict system design-to-cost approach with a proto-flight model development philosophy.In 2008 and 2009, the IXV project activities reached the successful completion of the project Phase-B, including the System PDR, and early project Phase-C.In 2010, following a re-organization of the industrial consortium, the IXV project successfully completed a design consolidation leading to an optimization of the technical baseline including the GNC, avionics (i.e. power, data handling, radio frequency and telemetry), measurement sensors, hot and cold composite structures, thermal protections and control, with significant improvements of the main system budgets.The project has successfully closed the System CDR during 2011 and it is currently running the Phase-D with the target to be launched with Vega from Kourou in 2014The paper will provide an overview of the IXV design and mission objectives in the frame of the atmospheric reentry overall activities, focusing on the avionics and software architecture and design.

Top