30 CFR 28.30 - Quality control plans; filing requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...
30 CFR 28.30 - Quality control plans; filing requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...
30 CFR 28.30 - Quality control plans; filing requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...
30 CFR 28.30 - Quality control plans; filing requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...
30 CFR 28.30 - Quality control plans; filing requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...
TH-AB-201-12: Using Machine Log-Files for Treatment Planning and Delivery QA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stanhope, C; Liang, J; Drake, D
2016-06-15
Purpose: To determine the segment reduction and dose resolution necessary for machine log-files to effectively replace current phantom-based patient-specific quality assurance, while minimizing computational cost. Methods: Elekta’s Log File Convertor R3.2 records linac delivery parameters (dose rate, gantry angle, leaf position) every 40ms. Five VMAT plans [4 H&N, 1 Pulsed Brain] comprised of 2 arcs each were delivered on the ArcCHECK phantom. Log-files were reconstructed in Pinnacle on the phantom geometry using 1/2/3/4° control point spacing and 2/3/4mm dose grid resolution. Reconstruction effectiveness was quantified by comparing 2%/2mm gamma passing rates of the original and log-file plans. Modulation complexity scoresmore » (MCS) were calculated for each beam to correlate reconstruction accuracy and beam modulation. Percent error in absolute dose for each plan-pair combination (log-file vs. ArcCHECK, original vs. ArcCHECK, log-file vs. original) was calculated for each arc and every diode greater than 10% of the maximum measured dose (per beam). Comparing standard deviations of the three plan-pair distributions, relative noise of the ArcCHECK and log-file systems was elucidated. Results: The original plans exhibit a mean passing rate of 95.1±1.3%. The eight more modulated H&N arcs [MCS=0.088±0.014] and two less modulated brain arcs [MCS=0.291±0.004] yielded log-file pass rates most similar to the original plan when using 1°/2mm [0.05%±1.3% lower] and 2°/3mm [0.35±0.64% higher] log-file reconstructions respectively. Log-file and original plans displayed percent diode dose errors 4.29±6.27% and 3.61±6.57% higher than measurement. Excluding the phantom eliminates diode miscalibration and setup errors; log-file dose errors were 0.72±3.06% higher than the original plans – significantly less noisy. Conclusion: For log-file reconstructed VMAT arcs, 1° control point spacing and 2mm dose resolution is recommended, however, less modulated arcs may allow less stringent reconstructions. Following the aforementioned reconstruction recommendations, the log-file technique is capable of detecting delivery errors with equivalent accuracy and less noise than ArcCHECK QA. I am funded by an Elekta Research Grant.« less
Pasler, Marlies; Kaas, Jochem; Perik, Thijs; Geuze, Job; Dreindl, Ralf; Künzler, Thomas; Wittkamper, Frits; Georg, Dietmar
2015-12-01
To systematically evaluate machine specific quality assurance (QA) for volumetric modulated arc therapy (VMAT) based on log files by applying a dynamic benchmark plan. A VMAT benchmark plan was created and tested on 18 Elekta linacs (13 MLCi or MLCi2, 5 Agility) at 4 different institutions. Linac log files were analyzed and a delivery robustness index was introduced. For dosimetric measurements an ionization chamber array was used. Relative dose deviations were assessed by mean gamma for each control point and compared to the log file evaluation. Fourteen linacs delivered the VMAT benchmark plan, while 4 linacs failed by consistently terminating the delivery. The mean leaf error (±1SD) was 0.3±0.2 mm for all linacs. Large MLC maximum errors up to 6.5 mm were observed at reversal positions. Delivery robustness index accounting for MLC position correction (0.8-1.0) correlated with delivery time (80-128 s) and depended on dose rate performance. Dosimetric evaluation indicated in general accurate plan reproducibility with γ(mean)(±1 SD)=0.4±0.2 for 1 mm/1%. However single control point analysis revealed larger deviations and attributed well to log file analysis. The designed benchmark plan helped identify linac related malfunctions in dynamic mode for VMAT. Log files serve as an important additional QA measure to understand and visualize dynamic linac parameters. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.
42 CFR 84.40 - Quality control plans; filing requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...
42 CFR 84.40 - Quality control plans; filing requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...
42 CFR 84.40 - Quality control plans; filing requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...
42 CFR 84.40 - Quality control plans; filing requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...
42 CFR 84.40 - Quality control plans; filing requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality... proposed quality control plan which shall be designed to assure the quality of respiratory protection...
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Div. of Library Development.
Underscoring the importance of newspapers as information sources on social and economic history, this report puts forth a statewide plan to catalog and preserve the newspaper files of New York State. The plan proposes the compilation of a statewide bibliography in two states: a preliminary survey to isolate and preserve files in greatest immediate…
[Discussion to the advanced application of scripting in RayStation TPS system].
Zhang, Jianying; Sun, Jing; Wang, Yun
2014-11-01
In this study, the implementation methods for the several functions are explored on RayStation 4.0 Platform. Those functions are passing the information such as ROI names to a plan prescription Word file. passing the file to RayStation for plan evaluation; passing the evaluation result to form an evaluated report file. The result shows the RayStation scripts can exchange data with Word, as well as control the running of Word and the content of a Word file. Consequently, it's feasible for scripts to inactive with third party softwares upgrade the performance of RayStation itself.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tateoka, K; Graduate School of Medicine, Sapporo Medical University, Sapporo, JP; Fujimomo, K
2014-06-01
Purpose: The aim of the study is to evaluate the use of Varian DynaLog files to verify VMAT plans delivery and modulation complexity score (MCS) of VMAT. Methods: Delivery accuracy of machine performance was quantified by multileaf collimator (MLC) position errors, gantry angle errors and fluence delivery accuracy for volumetric modulated arc therapy (VMAT). The relationship between machine performance and plan complexity were also investigated using the modulation complexity score (MCS). Plan and Actual MLC positions, gantry angles and delivered fraction of monitor units were extracted from Varian DynaLog files. These factors were taken from the record and verify systemmore » of MLC control file. Planned and delivered beam data were compared to determine leaf position errors and gantry angle errors. Analysis was also performed on planned and actual fluence maps reconstructed from those of the DynaLog files. This analysis was performed for all treatment fractions of 5 prostate VMAT plans. The analysis of DynaLog files have been carried out by in-house programming in Visual C++. Results: The root mean square of leaf position and gantry angle errors were about 0.12 and 0.15, respectively. The Gamma of planned and actual fluence maps at 3%/3 mm criterion was about 99.21. The gamma of the leaf position errors were not directly related to plan complexity as determined by the MCS. Therefore, the gamma of the gantry angle errors were directly related to plan complexity as determined by the MCS. Conclusion: This study shows Varian dynalog files for VMAT plan can be diagnosed delivery errors not possible with phantom based quality assurance. Furthermore, the MCS of VMAT plan can evaluate delivery accuracy for patients receiving of VMAT. Machine performance was found to be directly related to plan complexity but this is not the dominant determinant of delivery accuracy.« less
38. OUTLET WORKS: CONTROL HOUSE PLAN AND ELEVATIONS. Sheet ...
38. OUTLET WORKS: CONTROL HOUSE - PLAN AND ELEVATIONS. Sheet 32, August 20, 1938. File no. SA 121/71. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
SU-E-T-473: A Patient-Specific QC Paradigm Based On Trajectory Log Files and DICOM Plan Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeMarco, J; McCloskey, S; Low, D
Purpose: To evaluate a remote QC tool for monitoring treatment machine parameters and treatment workflow. Methods: The Varian TrueBeamTM linear accelerator is a digital machine that records machine axis parameters and MLC leaf positions as a function of delivered monitor unit or control point. This information is saved to a binary trajectory log file for every treatment or imaging field in the patient treatment session. A MATLAB analysis routine was developed to parse the trajectory log files for a given patient, compare the expected versus actual machine and MLC positions as well as perform a cross-comparison with the DICOM-RT planmore » file exported from the treatment planning system. The parsing routine sorts the trajectory log files based on the time and date stamp and generates a sequential report file listing treatment parameters and provides a match relative to the DICOM-RT plan file. Results: The trajectory log parsing-routine was compared against a standard record and verify listing for patients undergoing initial IMRT dosimetry verification and weekly and final chart QC. The complete treatment course was independently verified for 10 patients of varying treatment site and a total of 1267 treatment fields were evaluated including pre-treatment imaging fields where applicable. In the context of IMRT plan verification, eight prostate SBRT plans with 4-arcs per plan were evaluated based on expected versus actual machine axis parameters. The average value for the maximum RMS MLC error was 0.067±0.001mm and 0.066±0.002mm for leaf bank A and B respectively. Conclusion: A real-time QC analysis program was tested using trajectory log files and DICOM-RT plan files. The parsing routine is efficient and able to evaluate all relevant machine axis parameters during a patient treatment course including MLC leaf positions and table positions at time of image acquisition and during treatment.« less
Monte Carlo based, patient-specific RapidArc QA using Linac log files.
Teke, Tony; Bergman, Alanah M; Kwa, William; Gill, Bradford; Duzenli, Cheryl; Popescu, I Antoniu
2010-01-01
A Monte Carlo (MC) based QA process to validate the dynamic beam delivery accuracy for Varian RapidArc (Varian Medical Systems, Palo Alto, CA) using Linac delivery log files (DynaLog) is presented. Using DynaLog file analysis and MC simulations, the goal of this article is to (a) confirm that adequate sampling is used in the RapidArc optimization algorithm (177 static gantry angles) and (b) to assess the physical machine performance [gantry angle and monitor unit (MU) delivery accuracy]. Ten clinically acceptable RapidArc treatment plans were generated for various tumor sites and delivered to a water-equivalent cylindrical phantom on the treatment unit. Three Monte Carlo simulations were performed to calculate dose to the CT phantom image set: (a) One using a series of static gantry angles defined by 177 control points with treatment planning system (TPS) MLC control files (planning files), (b) one using continuous gantry rotation with TPS generated MLC control files, and (c) one using continuous gantry rotation with actual Linac delivery log files. Monte Carlo simulated dose distributions are compared to both ionization chamber point measurements and with RapidArc TPS calculated doses. The 3D dose distributions were compared using a 3D gamma-factor analysis, employing a 3%/3 mm distance-to-agreement criterion. The dose difference between MC simulations, TPS, and ionization chamber point measurements was less than 2.1%. For all plans, the MC calculated 3D dose distributions agreed well with the TPS calculated doses (gamma-factor values were less than 1 for more than 95% of the points considered). Machine performance QA was supplemented with an extensive DynaLog file analysis. A DynaLog file analysis showed that leaf position errors were less than 1 mm for 94% of the time and there were no leaf errors greater than 2.5 mm. The mean standard deviation in MU and gantry angle were 0.052 MU and 0.355 degrees, respectively, for the ten cases analyzed. The accuracy and flexibility of the Monte Carlo based RapidArc QA system were demonstrated. Good machine performance and accurate dose distribution delivery of RapidArc plans were observed. The sampling used in the TPS optimization algorithm was found to be adequate.
18. Historic plan of Building 100 control room. March 21, ...
18. Historic plan of Building 100 control room. March 21, 1956. NASA GRC drawing number CE-101736. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
A Position and Rate Control System: An Ingredient for Budget Planning.
ERIC Educational Resources Information Center
Gilbert, Linda L.
A position and rate control system was undertaken at Florida State University in 1974 to alleviate the problems of the manual budgeting system. The budget master file was created biweekly by combining a subset of the current payroll/personnel data base with the updated budget information from the previous budget master file, keying on positional…
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...
Katsuta, Yoshiyuki; Kadoya, Noriyuki; Fujita, Yukio; Shimizu, Eiji; Matsunaga, Kenichi; Matsushita, Haruo; Majima, Kazuhiro; Jingu, Keiichi
2017-10-01
A log file-based method cannot detect dosimetric changes due to linac component miscalibration because log files are insensitive to miscalibration. Herein, clinical impacts of dosimetric changes on a log file-based method were determined. Five head-and-neck and five prostate plans were applied. Miscalibration-simulated log files were generated by inducing a linac component miscalibration into the log file. Miscalibration magnitudes for leaf, gantry, and collimator at the general tolerance level were ±0.5mm, ±1°, and ±1°, respectively, and at a tighter tolerance level achievable on current linac were ±0.3mm, ±0.5°, and ±0.5°, respectively. Re-calculations were performed on patient anatomy using log file data. Changes in tumor control probability/normal tissue complication probability from treatment planning system dose to re-calculated dose at the general tolerance level was 1.8% on planning target volume (PTV) and 2.4% on organs at risk (OARs) in both plans. These changes at the tighter tolerance level were improved to 1.0% on PTV and to 1.5% on OARs, with a statistically significant difference. We determined the clinical impacts of dosimetric changes on a log file-based method using a general tolerance level and a tighter tolerance level for linac miscalibration and found that a tighter tolerance level significantly improved the accuracy of the log file-based method. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... single employer if such trades or businesses are within the same control group. The term ``control group'' means a group of trades or businesses under common control, and the determination of whether a trade or... not group health plans (``non-plan MEWAs''), the proposal preserves the structure promulgated as part...
Plan-provider integration, premiums, and quality in the Medicare Advantage market.
Frakt, Austin B; Pizer, Steven D; Feldman, Roger
2013-12-01
To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.
32 CFR 245.22 - Policy for application of EATPL.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) ESCAT Air Traffic... individual filing the flight plan will be responsible for including the priority number as determined by the originator of the aircraft flight operation, in the remarks section of the flight plan. (c) Situations may...
Instrumentation and control building, architectural, floor plans. Specifications no. Eng-04-353-55-72; Drawing No. 60-09-12' sheet 64 of 148; file no. 1321/15. Stamped: record drawing - as constructed. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
12 CFR 6.5 - Capital restoration plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Capital Categories § 6.5 Capital restoration plans. (a) Schedule for filing plan—(1) In general. A bank..., pursuant to § 6.4 and subpart M of part 19 of this chapter, shall include a description of the steps the... that controls the bank. (c) Review of capital restoration plans. Within 60 days after receiving a...
Poster - Thur Eve - 54: A software solution for ongoing DVH quality assurance in radiation therapy.
Annis, S-L; Zeng, G; Wu, X; Macpherson, M
2012-07-01
A program has been developed in MATLAB for use in quality assurance of treatment planning of radiation therapy. It analyzes patient DVH files and compiles dose volume data for review, trending, comparison and analysis. Patient DVH files are exported from the Eclipse treatment planning system and saved according to treatment sites and date. Currently analysis is available for 4 treatment sites; Prostate, Prostate Bed, Lung, and Upper GI, with two functions for data report and analysis: patient-specific and organ-specific. The patient-specific function loads one patient DVH file and reports the user-specified dose volume data of organs and targets. These data can be compiled to an external file for a third party analysis. The organ-specific function extracts a requested dose volume of an organ from the DVH files of a patient group and reports the statistics over this population. A graphical user interface is utilized to select clinical sites, function and structures, and input user's requests. We have implemented this program in planning quality assurance at our center. The program has tracked the dosimetric improvement in GU sites after VMAT was implemented clinically. It has generated dose volume statistics for different groups of patients associated with technique or time range. This program allows reporting and statistical analysis of DVH files. It is an efficient tool for the planning quality control in radiation therapy. © 2012 American Association of Physicists in Medicine.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
.../enviro/guidelines.asp . \\1\\ The attachments referenced in this notice will not appear in the Federal... at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp . With eFiling you can provide... the wider net of project types subject to the Plan and Procedure requirements. The revisions clarify...
49 CFR 272.105 - Requirement to file critical incident stress plan electronically.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Requirement to file critical incident stress plan...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CRITICAL INCIDENT STRESS PLANS Plan Components and Approval Process § 272.105 Requirement to file critical incident stress plan electronically...
12 CFR 170.3 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... plan. (a) Schedule for filing compliance plan— (1) In general. A Federal savings association shall file... of plan. The compliance plan shall include a description of the steps the Federal savings association... plan under this subpart, the OCC shall provide written notice to the Federal savings association of...
12 CFR 170.3 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... plan. (a) Schedule for filing compliance plan— (1) In general. A Federal savings association shall file... of plan. The compliance plan shall include a description of the steps the Federal savings association... plan under this subpart, the OCC shall provide written notice to the Federal savings association of...
12 CFR 170.3 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... plan. (a) Schedule for filing compliance plan— (1) In general. A Federal savings association shall file... of plan. The compliance plan shall include a description of the steps the Federal savings association... plan under this subpart, the OCC shall provide written notice to the Federal savings association of...
Implications of reduced involvement in en route air traffic control.
DOT National Transportation Integrated Search
1999-08-01
The expansion of the National Route Program will allow airlines to be more flexible in filing and amending flight plans. This may : result in a change in the role of the air traffic control specialist from direct control to a position with more monit...
49 CFR 239.201 - Emergency preparedness plan; filing and approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... response is addressed in the plan. (2) Filing of amendments to the plan. (i) Except as provided in... 49 Transportation 4 2014-10-01 2014-10-01 false Emergency preparedness plan; filing and approval...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
...; Notice of Filing of the Third Amendment to the National Market System Plan to Address Extraordinary... following parties to the National Market System Plan: BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago... preparing, filing, and implementing national market system plans. I. Definitions (A) ``Eligible Reported...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70765; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Topaz Exchange, LLC as a Plan Sponsor October...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70764; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Miami International Securities Exchange, LLC (...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70274; File No. 4-631] Joint Industry Plan; Notice of Filing of the Fifth Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y-Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago Stock Exchange, Inc., EDGA...
12 CFR 208.44 - Capital restoration plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Action § 208.44 Capital restoration plans. (a) Schedule for filing plan—(1) In general. A member bank... § 208.43(c) shall include a description of the steps the bank will take to correct the unsafe or unsound... section 38(e)(2)(C) of that Act by each company that controls the bank. (c) Review of capital restoration...
SU-E-T-392: Evaluation of Ion Chamber/film and Log File Based QA to Detect Delivery Errors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, C; Mason, B; Kirsner, S
2015-06-15
Purpose: Ion chamber and film (ICAF) is a method used to verify patient dose prior to treatment. More recently, log file based QA has been shown as an alternative for measurement based QA. In this study, we delivered VMAT plans with and without errors to determine if ICAF and/or log file based QA was able to detect the errors. Methods: Using two VMAT patients, the original treatment plan plus 7 additional plans with delivery errors introduced were generated and delivered. The erroneous plans had gantry, collimator, MLC, gantry and collimator, collimator and MLC, MLC and gantry, and gantry, collimator, andmore » MLC errors. The gantry and collimator errors were off by 4{sup 0} for one of the two arcs. The MLC error introduced was one in which the opening aperture didn’t move throughout the delivery of the field. For each delivery, an ICAF measurement was made as well as a dose comparison based upon log files. Passing criteria to evaluate the plans were ion chamber less and 5% and film 90% of pixels pass the 3mm/3% gamma analysis(GA). For log file analysis 90% of voxels pass the 3mm/3% 3D GA and beam parameters match what was in the plan. Results: Two original plans were delivered and passed both ICAF and log file base QA. Both ICAF and log file QA met the dosimetry criteria on 4 of the 12 erroneous cases analyzed (2 cases were not analyzed). For the log file analysis, all 12 erroneous plans alerted a mismatch in delivery versus what was planned. The 8 plans that didn’t meet criteria all had MLC errors. Conclusion: Our study demonstrates that log file based pre-treatment QA was able to detect small errors that may not be detected using an ICAF and both methods of were able to detect larger delivery errors.« less
Study of the IMRT interplay effect using a 4DCT Monte Carlo dose calculation.
Jensen, Michael D; Abdellatif, Ady; Chen, Jeff; Wong, Eugene
2012-04-21
Respiratory motion may lead to dose errors when treating thoracic and abdominal tumours with radiotherapy. The interplay between complex multileaf collimator patterns and patient respiratory motion could result in unintuitive dose changes. We have developed a treatment reconstruction simulation computer code that accounts for interplay effects by combining multileaf collimator controller log files, respiratory trace log files, 4DCT images and a Monte Carlo dose calculator. Two three-dimensional (3D) IMRT step-and-shoot plans, a concave target and integrated boost were delivered to a 1D rigid motion phantom. Three sets of experiments were performed with 100%, 50% and 25% duty cycle gating. The log files were collected, and five simulation types were performed on each data set: continuous isocentre shift, discrete isocentre shift, 4DCT, 4DCT delivery average and 4DCT plan average. Analysis was performed using 3D gamma analysis with passing criteria of 2%, 2 mm. The simulation framework was able to demonstrate that a single fraction of the integrated boost plan was more sensitive to interplay effects than the concave target. Gating was shown to reduce the interplay effects. We have developed a 4DCT Monte Carlo simulation method that accounts for IMRT interplay effects with respiratory motion by utilizing delivery log files.
40 CFR 72.42 - Phase I extension plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... consistent with the data filed on EIA form 767 for those years and the conversion methodology specified in... of fossil fuels (before any treatment prior to combustion) that will be used at the control unit...
40 CFR 72.42 - Phase I extension plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... consistent with the data filed on EIA form 767 for those years and the conversion methodology specified in... of fossil fuels (before any treatment prior to combustion) that will be used at the control unit...
40 CFR 72.42 - Phase I extension plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... consistent with the data filed on EIA form 767 for those years and the conversion methodology specified in... of fossil fuels (before any treatment prior to combustion) that will be used at the control unit...
40 CFR 72.42 - Phase I extension plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... consistent with the data filed on EIA form 767 for those years and the conversion methodology specified in... of fossil fuels (before any treatment prior to combustion) that will be used at the control unit...
40 CFR 72.42 - Phase I extension plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... consistent with the data filed on EIA form 767 for those years and the conversion methodology specified in... of fossil fuels (before any treatment prior to combustion) that will be used at the control unit...
12 CFR 516.15 - Must I meet with OTS before I file my application?
Code of Federal Regulations, 2010 CFR
2010-01-01
... with OTS before filing your application. You must submit a draft business plan before this meeting. (2... you to submit a draft business plan or other relevant information before this meeting. (b) Contacting... pre-filing meeting or a draft business plan, the Regional Office will determine whether it will...
9 CFR 108.7 - Filing of plot plans, blueprints, and legends.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Filing of plot plans, blueprints, and legends. 108.7 Section 108.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE... REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.7 Filing of plot plans, blueprints, and legends. Three copies of...
12 CFR 30.4 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... steps the bank will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance plans. Within 30 days after receiving a safety and... AND SOUNDNESS STANDARDS § 30.4 Filing of safety and soundness compliance plan. (a) Schedule for filing...
12 CFR 570.3 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...
12 CFR 391.12 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Filing of safety and soundness compliance plan. 391.12 Section 391.12 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND... and Compliance Procedures § 391.12 Filing of safety and soundness compliance plan. (a) Schedule for...
12 CFR 391.12 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Filing of safety and soundness compliance plan. 391.12 Section 391.12 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND... and Compliance Procedures § 391.12 Filing of safety and soundness compliance plan. (a) Schedule for...
12 CFR 391.12 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Filing of safety and soundness compliance plan. 391.12 Section 391.12 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND... and Compliance Procedures § 391.12 Filing of safety and soundness compliance plan. (a) Schedule for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-62079; File No. 4-598] Program for Allocation... Order gives effect to the Plan filed with the Commission in File No. 4-598. The Parties shall notify all..., pursuant to Section 17(d) of the Act, that the Plan in File No. 4-598, between FINRA and EDGX, filed...
Better Management of Private Pension Plan Data Can Reduce Costs and Improve ERISA Administration.
1981-10-19
effectiveness of (1) the agencies’ efforts to make sure pension plans file ERISA annual reports, annual premium filings, and summary plan descrip- tions...Information required to be reported annually by private pension plans is not being effectively , efficiently, or economically managed. Although complex...maries if Labor is to effectively provide requestors with summaries from its own files as anticipated by ERISA. Such action would add significantly to
Log file-based patient dose calculations of double-arc VMAT for head-and-neck radiotherapy.
Katsuta, Yoshiyuki; Kadoya, Noriyuki; Fujita, Yukio; Shimizu, Eiji; Majima, Kazuhiro; Matsushita, Haruo; Takeda, Ken; Jingu, Keiichi
2018-04-01
The log file-based method cannot display dosimetric changes due to linac component miscalibration because of the insensitivity of log files to linac component miscalibration. The purpose of this study was to supply dosimetric changes in log file-based patient dose calculations for double-arc volumetric-modulated arc therapy (VMAT) in head-and-neck cases. Fifteen head-and-neck cases participated in this study. For each case, treatment planning system (TPS) doses were produced by double-arc and single-arc VMAT. Miscalibration-simulated log files were generated by inducing a leaf miscalibration of ±0.5 mm into the log files that were acquired during VMAT irradiation. Subsequently, patient doses were estimated using the miscalibration-simulated log files. For double-arc VMAT, regarding planning target volume (PTV), the change from TPS dose to miscalibration-simulated log file dose in D mean was 0.9 Gy and that for tumor control probability was 1.4%. As for organ-at-risks (OARs), the change in D mean was <0.7 Gy and normal tissue complication probability was <1.8%. A comparison between double-arc and single-arc VMAT for PTV showed statistically significant differences in the changes evaluated by D mean and radiobiological metrics (P < 0.01), even though the magnitude of these differences was small. Similarly, for OARs, the magnitude of these changes was found to be small. Using the log file-based method for PTV and OARs, the log file-based method estimate of patient dose using the double-arc VMAT has accuracy comparable to that obtained using the single-arc VMAT. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
29 CFR 4007.12 - Liability for single-employer premiums.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the plan administrator as the person required to make flat-rate and variable-rate premium filings... liable for flat-rate and variable-rate premium payments, and, if the contributing sponsor is a member of a controlled group, each member of the controlled group is jointly and severally liable for the...
TU-CD-304-11: Veritas 2.0: A Cloud-Based Tool to Facilitate Research and Innovation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mishra, P; Patankar, A; Etmektzoglou, A
Purpose: We introduce Veritas 2.0, a cloud-based, non-clinical research portal, to facilitate translation of radiotherapy research ideas to new delivery techniques. The ecosystem of research tools includes web apps for a research beam builder for TrueBeam Developer Mode, an image reader for compressed and uncompressed XIM files, and a trajectory log file based QA/beam delivery analyzer. Methods: The research beam builder can generate TrueBeam readable XML file either from scratch or from pre-existing DICOM-RT plans. DICOM-RT plan is first converted to XML format and then researcher can interactively modify or add control points to them. Delivered beam can be verifiedmore » via reading generated images and analyzing trajectory log files. Image reader can read both uncompressed and HND-compressed XIM images. The trajectory log analyzer lets researchers plot expected vs. actual values and deviations among 30 mechanical axes. The analyzer gives an animated view of MLC patterns for the beam delivery. Veritas 2.0 is freely available and its advantages versus standalone software are i) No software installation or maintenance needed, ii) easy accessibility across all devices iii) seamless upgrades and iv) OS independence. Veritas is written using open-source tools like twitter bootstrap, jQuery, flask, and Python-based modules. Results: In the first experiment, an anonymized 7-beam DICOM-RT IMRT plan was converted to XML beam containing 1400 control points. kV and MV imaging points were inserted into this XML beam. In another experiment, a binary log file was analyzed to compare actual vs expected values and deviations among axes. Conclusions: Veritas 2.0 is a public cloud-based web app that hosts a pool of research tools for facilitating research from conceptualization to verification. It is aimed at providing a platform for facilitating research and collaboration. I am full time employee at Varian Medical systems, Palo Alto.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... Authority; Notice of Extension of Time To File Comments on the Proposed Study and Revised Study Plan On July 16, 2012, Alaska Energy Authority (AEA) filed its proposed study plan for the Susitna-Watana Project... Process, making comments on the study plan due October 14, 2012. During the comment period, AEA finalized...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70273; File No. 4-631] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Fourth Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68953; File No. 4-631] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of the Second Amendment to the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... the firm controls access to market data and not for external interrogation devices or internal interrogation devices for which a vendor (and not the firm) controls access to market data. This program better... that its employees use and in respect of which the firm controls access to market data. The...
Effects of Early Dual-Eligible Special Needs Plans on Health Expenditure.
Zhang, Yongkang; Diana, Mark L
2017-10-18
To examine the effects of the penetration of dual-eligible special needs plans (D-SNPs) on health care spending. Secondary state-level panel data from Medicare-Medicaid Linked Enrollee Analytic Data Source (MMLEADS) public use file and Special Needs Plan Comprehensive Reports, Area Health Resource Files, and Medicaid Managed Care Enrollment Report between 2007 and 2011. A difference-in-difference strategy that adjusts for dual-eligibles' demographic and socioeconomic characteristics, state health resources, beneficiaries' health risk factors, Medicare/Medicaid enrollment, and state- and year-fixed effects. Data from MMLEADS were summarized from Centers for Medicare and Medicaid Services (CMS)'s Chronic Conditions Data Warehouse, which contains 100 percent of Medicare enrollment data, claims for beneficiaries who are enrolled in the fee-for-service (FFS) program, and Medicaid Analytic Extract files. The MMLEADS public use file also includes payment information for managed care. Data in Special Needs Plan Comprehensive Reports were from CMS's Health Plan Management System. Results indicate that D-SNPs penetration was associated with reduced Medicare spending per dual-eligible beneficiary. Specifically, a 1 percent increase in D-SNPs penetration was associated with 0.2 percent reduction in Medicare spending per beneficiary. We found no association between D-SNPs penetration and Medicaid or total spending. Involving Medicaid services in D-SNPs may be crucial to improve coordination between Medicare and Medicaid programs and control Medicaid spending among dual-eligible beneficiaries. Starting from 2013, D-SNPs were mandated to have contracts with state Medicaid agencies. This change may introduce new effects of D-SNPs on health care spending. More research is needed to examine the impact of D-SNPs on dual-eligible spending. © Health Research and Educational Trust.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-14
... Martin Dam Project: (1) A flood control guide; (2) an operating guide; and (3) a drought contingency.... The drought contingency plan provides an indication of impending hydrologic drought conditions. m. A...
49 CFR 239.201 - Emergency preparedness plan; filing and approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Emergency preparedness plan; filing and approval...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS Review, Approval, and Retention of Emergency Preparedness Plans § 239.201 Emergency preparedness plan...
49 CFR 239.201 - Emergency preparedness plan; filing and approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... response is addressed in the plan. Each subsequent amendment to a railroad's emergency preparedness plan... 49 Transportation 4 2013-10-01 2013-10-01 false Emergency preparedness plan; filing and approval...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS...
49 CFR 239.201 - Emergency preparedness plan; filing and approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... response is addressed in the plan. Each subsequent amendment to a railroad's emergency preparedness plan... 49 Transportation 4 2011-10-01 2011-10-01 false Emergency preparedness plan; filing and approval...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68655; File No. SR-OPRA-2012-07] Options Price Reporting Authority; Notice of Filing of Proposed Amendment to the Plan for Reporting of Consolidated Options Last Sale Reports and Quotation Information To Amend Section 3.5 of the OPRA Plan January 15, 2013. Pursuant to Section 11A of the...
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2014 CFR
2014-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2013 CFR
2013-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2012 CFR
2012-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
Tucker, D M; Wenckus, C S; Bentkover, S K
1997-03-01
Twenty-two mesial roots of extracted human mandibular molars were divided into two groups based on root curvature and length. The mesiolingual canals were instrumented using either Flexofiles in a step-back anticurvature filing method, or they were instrumented with engine-driven 0.02 taper nickel-titanium files. Ground sections were prepared at 1-, 2.5-, and 5-mm levels from the working length. The mesiobuccal canal was used as an uninstrumented control for predentin character. Digitizing software was used to calculate the instrumented portion as a percentage of the total canal perimeter. The results indicated no significant difference in overall canal wall planning between the two groups and no significant difference at each of the three levels.
1989-10-01
REVIEW MENU PROGRAM (S) CHAPS PURPOSE AND OVERVIEV The Do Review menu allows the user to select which missions to perform detailed analysis on and...input files must be resident on the computer you are running SUPR on. Any interface or file transfer programs must be successfully executed prior to... COMPUTER PROGRAM WAS DEVELOPED BY SYSTEMS CONTROL TECHNOLOGY FOR THE DEPUTY CHIEF OF STAFF/OPERATIONS,HQ USAFE. THE USE OF THE COMPUTER PROGRAM IS
Technological Enhancements for Personal Computers
1992-03-01
quicker order processing , shortening the time required to obtain critical spare parts. 31 Customer service and spare parts tracking are facilitated by...cards speed up order processing and filing. Bar code readers speed inventory control processing. D. DEPLOYMENT PLANNING. Many units with high mobility
Instrumentation and control systems, equipment location; instrumentation and control building, ...
Instrumentation and control systems, equipment location; instrumentation and control building, instrumentation room, bays and console plan. Specifications No. Eng-04-353-55-72; drawing no. 60-09-12; sheet 110 of 148; file no. 1321/61. Stamped: Record drawing - as constructed. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-27
... Control. In the event of a change of control of a Listing Market, the Listing Market will have the... Agreement from (a) the Consolidated Tape Association (``CTA'') as the exclusive securities information... Unlisted Trading Privileges Plan as the exclusive SIP for all NASDAQ[-listed securities] Listed Stocks. b...
Plan–Provider Integration, Premiums, and Quality in the Medicare Advantage Market
Frakt, Austin B; Pizer, Steven D; Feldman, Roger
2013-01-01
Objective. To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. Data Source. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. Study Design. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan–provider integration. Data Collection. With the exception of Medigap premium data, all data were publicly available. We ascertained plan–provider integration through examination of plans’ websites and governance documents. Principal Findings. We found that integrated plan–providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Conclusions. Current policy encourages plan–provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). PMID:23800017
75 FR 80851 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
..., including highway bridge and tunnel correspondence, designs and plans, geotechnical and hydraulic files... files, asphalt and pavement research files, statewide contract files, delineation files, recycling and...
Air Traffic Complexity Measurement Environment (ACME): Software User's Guide
NASA Technical Reports Server (NTRS)
1996-01-01
A user's guide for the Air Traffic Complexity Measurement Environment (ACME) software is presented. The ACME consists of two major components, a complexity analysis tool and user interface. The Complexity Analysis Tool (CAT) analyzes complexity off-line, producing data files which may be examined interactively via the Complexity Data Analysis Tool (CDAT). The Complexity Analysis Tool is composed of three independently executing processes that communicate via PVM (Parallel Virtual Machine) and Unix sockets. The Runtime Data Management and Control process (RUNDMC) extracts flight plan and track information from a SAR input file, and sends the information to GARP (Generate Aircraft Routes Process) and CAT (Complexity Analysis Task). GARP in turn generates aircraft trajectories, which are utilized by CAT to calculate sector complexity. CAT writes flight plan, track and complexity data to an output file, which can be examined interactively. The Complexity Data Analysis Tool (CDAT) provides an interactive graphic environment for examining the complexity data produced by the Complexity Analysis Tool (CAT). CDAT can also play back track data extracted from System Analysis Recording (SAR) tapes. The CDAT user interface consists of a primary window, a controls window, and miscellaneous pop-ups. Aircraft track and position data is displayed in the main viewing area of the primary window. The controls window contains miscellaneous control and display items. Complexity data is displayed in pop-up windows. CDAT plays back sector complexity and aircraft track and position data as a function of time. Controls are provided to start and stop playback, adjust the playback rate, and reposition the display to a specified time.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
... Reporting Authority; Notice of Filing and Immediate Effectiveness of Proposed Amendment To Revise the Plan... (``Commission'') an amendment to the Plan for Reporting of Consolidated Options Last Sale Reports and Quotation Information (``OPRA Plan'').\\3\\ The proposed amendment would revise the OPRA Plan for the sole purpose of...
Park, Jong In; Park, Jong Min; Kim, Jung-In; Park, So-Yeon; Ye, Sung-Joon
2015-12-01
The aim of this study was to investigate the sensitivity of the gamma-index method according to various gamma criteria for volumetric modulated arc therapy (VMAT). Twenty head and neck (HN) and twenty prostate VMAT plans were retrospectively selected for this study. Both global and local 2D gamma evaluations were performed with criteria of 3%/3 mm, 2%/2 mm, 1%/2 mm and 2%/1 mm. In this study, the global and local gamma-index calculated the differences in doses relative to the maximum dose and the dose at the current measurement point, respectively. Using log files acquired during delivery, the differences in parameters at every control point between the VMAT plans and the log files were acquired. The differences in dose-volumetric parameters between reconstructed VMAT plans using the log files and the original VMAT plans were calculated. The Spearman's rank correlation coefficients (rs) were calculated between the passing rates and those differences. Considerable correlations with statistical significances were observed between global 1%/2 mm, local 1%/2 mm and local 2%/1 mm and the MLC position differences (rs = -0.712, -0.628 and -0.581). The numbers of rs values with statistical significance between the passing rates and the changes in dose-volumetric parameters were largest in global 2%/2 mm (n = 16), global 2%/1 mm (n = 15) and local 2%/1 mm (n = 13) criteria. Local gamma-index method with 2%/1 mm generally showed higher sensitivity to detect deviations between a VMAT plan and the delivery of the VMAT plan. Copyright © 2015 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Luo, G
2014-06-01
Purpose: In order to receive DICOM files from treatment planning system and generate patient isocenter positioning parameter file for CT laser system automatically, this paper presents a method for communication with treatment planning system and calculation of isocenter parameter for each radiation field. Methods: Coordinate transformation and laser positioning file formats were analyzed, isocenter parameter was calculated via data from DICOM CT Data and DICOM RTPLAN file. An in-house software-DicomGenie was developed based on the object-oriented program platform-Qt with DCMTK SDK (Germany OFFIS company DICOM SDK) . DicomGenie was tested for accuracy using Philips CT simulation plan system (Tumor LOC,more » Philips) and A2J CT positioning laser system (Thorigny Sur Marne, France). Results: DicomGenie successfully established DICOM communication between treatment planning system, DICOM files were received by DicomGenie and patient laser isocenter information was generated accurately. Patient laser parameter data files can be used for for CT laser system directly. Conclusion: In-house software DicomGenie received and extracted DICOM data, isocenter laser positioning data files were created by DicomGenie and can be use for A2J laser positioning system.« less
29 CFR 4043.20 - Post-Event filing obligation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Post-Event filing obligation. 4043.20 Section 4043.20 Labor... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS Post-Event Notice of Reportable Events § 4043.20 Post-Event filing obligation. The plan administrator and each contributing sponsor of a plan for which a...
29 CFR 4043.20 - Post-Event filing obligation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 9 2014-07-01 2014-07-01 false Post-Event filing obligation. 4043.20 Section 4043.20 Labor... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS Post-Event Notice of Reportable Events § 4043.20 Post-Event filing obligation. The plan administrator and each contributing sponsor of a plan for which a...
29 CFR 4043.20 - Post-Event filing obligation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 9 2013-07-01 2013-07-01 false Post-Event filing obligation. 4043.20 Section 4043.20 Labor... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS Post-Event Notice of Reportable Events § 4043.20 Post-Event filing obligation. The plan administrator and each contributing sponsor of a plan for which a...
29 CFR 4043.20 - Post-Event filing obligation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 9 2012-07-01 2012-07-01 false Post-Event filing obligation. 4043.20 Section 4043.20 Labor... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS Post-Event Notice of Reportable Events § 4043.20 Post-Event filing obligation. The plan administrator and each contributing sponsor of a plan for which a...
29 CFR 4043.20 - Post-Event filing obligation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 9 2011-07-01 2011-07-01 false Post-Event filing obligation. 4043.20 Section 4043.20 Labor... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS Post-Event Notice of Reportable Events § 4043.20 Post-Event filing obligation. The plan administrator and each contributing sponsor of a plan for which a...
18 CFR 12.23 - Time for filing emergency action plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... might endanger construction workers or otherwise endanger public health or safety, a temporary... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans § 12.23 Time for filing emergency action plan. (a...
50 CFR 270.21 - Petition of objection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF COMMERCE FISH AND SEAFOOD PROMOTION SPECIES-SPECIFIC SEAFOOD MARKETING COUNCILS... promotion plan by filing a written petition of objection with NMFS. Petitions of objection may be filed: (1... and promotion plan, or obligation imposed by the plan, to which the petitioner objects; (3) A full...
7. This photographic copy of an engineering drawing displays the ...
7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
12 CFR 325.104 - Capital restoration plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Capital restoration plans. 325.104 Section 325.104 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL... filing plan—(1) In general. A bank shall file a written capital restoration plan with the appropriate...
75 FR 26745 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
... of October 15, 2009 Order on 2010 Business Plans and Budgets. Filed Date: 05/03/2010. Accession... Electric Reliability Corporation for Approval of Amended 2010 Business Plan and Budget of Western...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (k) Certificate of need. If the loan request is for health care facilities (e.g., hospitals or... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
7 CFR 1980.451 - Filing and processing applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of the subpart. (k) Certificate of need. If the loan request is for health care facilities (e.g... schools, water, sewer and health care services, and if so, the community's plan for providing such... Certificate of Need (Health Care Facilities) 3 Clean Air and Water Pollution Control Act Requirements...
Catching errors with patient-specific pretreatment machine log file analysis.
Rangaraj, Dharanipathy; Zhu, Mingyao; Yang, Deshan; Palaniswaamy, Geethpriya; Yaddanapudi, Sridhar; Wooten, Omar H; Brame, Scott; Mutic, Sasa
2013-01-01
A robust, efficient, and reliable quality assurance (QA) process is highly desired for modern external beam radiation therapy treatments. Here, we report the results of a semiautomatic, pretreatment, patient-specific QA process based on dynamic machine log file analysis clinically implemented for intensity modulated radiation therapy (IMRT) treatments delivered by high energy linear accelerators (Varian 2100/2300 EX, Trilogy, iX-D, Varian Medical Systems Inc, Palo Alto, CA). The multileaf collimator machine (MLC) log files are called Dynalog by Varian. Using an in-house developed computer program called "Dynalog QA," we automatically compare the beam delivery parameters in the log files that are generated during pretreatment point dose verification measurements, with the treatment plan to determine any discrepancies in IMRT deliveries. Fluence maps are constructed and compared between the delivered and planned beams. Since clinical introduction in June 2009, 912 machine log file analyses QA were performed by the end of 2010. Among these, 14 errors causing dosimetric deviation were detected and required further investigation and intervention. These errors were the result of human operating mistakes, flawed treatment planning, and data modification during plan file transfer. Minor errors were also reported in 174 other log file analyses, some of which stemmed from false positives and unreliable results; the origins of these are discussed herein. It has been demonstrated that the machine log file analysis is a robust, efficient, and reliable QA process capable of detecting errors originating from human mistakes, flawed planning, and data transfer problems. The possibility of detecting these errors is low using point and planar dosimetric measurements. Copyright © 2013 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4001, 4022, and 4044 RIN 1212-AA98 Bankruptcy Filing Date Treated as Plan Termination Date for Certain Purposes; Guaranteed Benefits; Allocation of Plan Assets; Pension Protection Act of 2006 AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Amendment to the National Market System Plan to Address Extraordinary Market Volatility, File No. 4-631... Market System Plan To Address Extraordinary Market Volatility). \\7\\ See Securities Exchange Act Release... requirements of the Plan are coupled with Trading Pauses to accommodate more fundamental price moves (as...
A Histologic Comparison of the Canal Wall Planning Ability of Two New Endodontic Files,
1983-01-01
preparation of root canals. Oral Surg 1968; 25: 108-116. 14. Senia ES, Marshall FJ, Rosen S. The solvent action of sodium hypochlorite on pulp tissue of...PERiOO COGERED A Histologic Comparison Of The Canal Wall Planning Ability Of Two New Endodontic Files THESIS/rI1 N 6 PERFORMi-4G 01 G. REPORT NuMBI...TITLE: A Histologic Comparison Of The Canal Wall Planning Ability Of Two New Endodontic Files AUTHOR: Robert L Hill and Carlos E. del Rio RESEARCH
SU-E-T-184: Clinical VMAT QA Practice Using LINAC Delivery Log Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnston, H; Jacobson, T; Gu, X
2015-06-15
Purpose: To evaluate the accuracy of volumetric modulated arc therapy (VMAT) treatment delivery dose clouds by comparing linac log data to doses measured using an ionization chamber and film. Methods: A commercial IMRT quality assurance (QA) process utilizing a DICOM-RT framework was tested for clinical practice using 30 prostate and 30 head and neck VMAT plans. Delivered 3D VMAT dose distributions were independently checked using a PinPoint ionization chamber and radiographic film in a solid water phantom. DICOM RT coordinates were used to extract the corresponding point and planar doses from 3D log file dose distributions. Point doses were evaluatedmore » by computing the percent error between log file and chamber measured values. A planar dose evaluation was performed for each plan using a 2D gamma analysis with 3% global dose difference and 3 mm isodose point distance criteria. The same analysis was performed to compare treatment planning system (TPS) doses to measured values to establish a baseline assessment of agreement. Results: The mean percent error between log file and ionization chamber dose was 1.0%±2.1% for prostate VMAT plans and −0.2%±1.4% for head and neck plans. The corresponding TPS calculated and measured ionization chamber values agree within 1.7%±1.6%. The average 2D gamma passing rates for the log file comparison to film are 98.8%±1.0% and 96.2%±4.2% for the prostate and head and neck plans, respectively. The corresponding passing rates for the TPS comparison to film are 99.4%±0.5% and 93.9%±5.1%. Overall, the point dose and film data indicate that log file determined doses are in excellent agreement with measured values. Conclusion: Clinical VMAT QA practice using LINAC treatment log files is a fast and reliable method for patient-specific plan evaluation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holland, Robert C.
A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.
29 CFR 4007.3 - Filing requirement; method of filing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Filing requirement; method of filing. 4007.3 Section 4007.3... PREMIUMS § 4007.3 Filing requirement; method of filing. (a) In general. The estimation, determination... Web site (http://www.pbgc.gov). Subject to the provisions of § 4007.13, the plan administrator of each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... filings must be submitted in accordance with the Commission's electronic tariff filing (eTariff... eTariff Filing Title field and in the Description field in eFiling. DATES: Effective on October 4... electronic tariff filing (eTariff) requirements in Electronic Tariff Filings, Order No. 714, FERC Stats...
14 CFR 152.407 - Affirmative action plan: General.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative action...
14 CFR 152.407 - Affirmative action plan: General.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative action...
12 CFR 308.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... response, subject to the deadline provided in paragraph (a)(1) of this section. (b) Contents of plan. The... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Filing of safety and soundness compliance plan. 308.303 Section 308.303 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF...
12 CFR 263.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... that plan, order, agreement, or response, subject to the deadline provided in paragraph (a)(1) of this... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Filing of safety and soundness compliance plan. 263.303 Section 263.303 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE...
12 CFR 308.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... response, subject to the deadline provided in paragraph (a)(1) of this section. (b) Contents of plan. The... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Filing of safety and soundness compliance plan. 308.303 Section 308.303 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF...
12 CFR 308.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... response, subject to the deadline provided in paragraph (a)(1) of this section. (b) Contents of plan. The... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Filing of safety and soundness compliance plan. 308.303 Section 308.303 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF...
12 CFR 263.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... that plan, order, agreement, or response, subject to the deadline provided in paragraph (a)(1) of this... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Filing of safety and soundness compliance plan. 263.303 Section 263.303 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE...
12 CFR 263.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... this section as part of that plan, order, agreement, or response, subject to the deadline provided in... 12 Banks and Banking 4 2012-01-01 2012-01-01 false Filing of safety and soundness compliance plan. 263.303 Section 263.303 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE...
12 CFR 263.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... this section as part of that plan, order, agreement, or response, subject to the deadline provided in... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Filing of safety and soundness compliance plan. 263.303 Section 263.303 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE...
12 CFR 263.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... this section as part of that plan, order, agreement, or response, subject to the deadline provided in... 12 Banks and Banking 4 2013-01-01 2013-01-01 false Filing of safety and soundness compliance plan. 263.303 Section 263.303 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE...
12 CFR 308.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... response, subject to the deadline provided in paragraph (a)(1) of this section. (b) Contents of plan. The... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Filing of safety and soundness compliance plan. 308.303 Section 308.303 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF...
12 CFR 308.303 - Filing of safety and soundness compliance plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... response, subject to the deadline provided in paragraph (a)(1) of this section. (b) Contents of plan. The... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Filing of safety and soundness compliance plan. 308.303 Section 308.303 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF...
Automation for "Direct-to" Clearances in Air-Traffic Control
NASA Technical Reports Server (NTRS)
Erzberger, Heinz; McNally, David
2006-01-01
A method of automation, and a system of computer hardware and software to implement the method, have been invented to assist en-route air-traffic controllers in the issuance of clearances to fly directly to specified waypoints or navigation fixes along straight paths that deviate from previously filed flight plans. Such clearances, called "direct-to" clearances, have been in use since before the invention of this method and system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
[Investigation of Elekta linac characteristics for VMAT].
Luo, Guangwen; Zhang, Kunyi
2012-01-01
The aim of this study is to investigate the characteristics of Elekta delivery system for volumetric modulated arc therapy (VMAT). Five VMAT plans were delivered in service mode and dose rates, and speed of gantry and MLC leaves were analyzed by log files. Results showed that dose rates varied between 6 dose rates. Gantry and MLC leaf speed dynamically varied during delivery. The technique of VMAT requires linac to dynamically control more parameters, and these key dynamic variables during VMAT delivery can be checked by log files. Quality assurance procedure should be carried out for VMAT related parameter.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... Computer Corp., Taipei, TAIWAN; Dongguan ChuDong Electronic Technology Co., Ltd., Dongguan City, Guangdong... have been made in either the membership or planned activity of the group research project. Membership in this group research project remains open, and DVD CCA intends to file additional written...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
...'') as approved by the Commission \\9\\ and proposed changes to market making quoting requirements through... of the Plan and proposed changes to market making quoting requirements. Thus, the Exchange believes... control, in turn, enables Market Makers to comply independently with the requirements of Regulation SHO \\5...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
...'') as approved by the Commission \\9\\ and proposed changes to market making quoting requirements through... date in light of the Plan and proposed changes to market making quoting requirements. Thus, the... control, in turn, enables Market Makers to comply independently with the requirements of Regulation SHO \\5...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... due, NASDAQ's experience is that the company's plan often requires detailed analysis by staff to...)(A)(iii) [sic]. NASDAQ's experience is that these types of deficiencies often arise unexpectedly from events outside the control of the company, such as the death or resignation of a director. Further...
ERIC Educational Resources Information Center
Bowen, Brian
1974-01-01
The third installment of a Building Cost File points out the necessity of providing a framework for overall cost control during design. A cost analysis (see EA 504 571) illustrates how the use of construction elements or subsystems provide a suitable means. Other related articles are EA 503 949, 950, 951, and EA 504 578-579. (MF)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
... Hydro LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Application for a New License and Commencing Pre-filing Process. b. Project No.: 2531-067. c. Dated Filed... Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
..., LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving... Application and Request to Use the Traditional Licensing Process. b. Project No.: 13755-001. c. Date Filed.... m. Free Flow Power filed a Pre-Application Document (PAD; including a proposed process plan and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
... options exchanges. The participants of the Old Plan established a new plan to provide a more modern... respect to the proposed rule change that are filed with the Commission, and all written communications...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wijesooriya, K; Seitter, K; Desai, V
Purpose: To present our single institution experience on catching errors with trajectory log file analysis. The reported causes of failures, probability of occurrences (O), severity of effects (S), and the probability of the failures to be undetected (D) could be added to guidelines of FMEA analysis. Methods: From March 2013 to March 2014, 19569 patient treatment fields/arcs were analyzed. This work includes checking all 131 treatment delivery parameters for all patients, all treatment sites and all treatment delivery fractions. TrueBeam trajectory log files for all treatment field types as well as all imaging types were accessed, read in every 20ms,more » and every control point (total of 37 million parameters) compared to the physician approved plan in the planning system. Results: Couch angle outlier occurrence: N= 327, range = −1.7 −1.2 deg; gantry angle outlier occurrence: N =59, range = 0.09 – 5.61 deg, collimator angle outlier occurrence: N = 13, range = −0.2 – 0.2 deg. VMAT cases have slightly larger variations in mechanical parameters. MLC: 3D single control point fields have a maximum deviation of 0.04 mm, 39 step and shoot IMRT cases have MLC −0.3 – 0.5 mm deviations, all (1286) VMAT cases have −0.9 – 0.7 mm deviations. Two possible serious errors were found: 1) A 4 cm isocenter shift for the PA beam of an AP-PA pair, under-dosing a portion of PTV by 25%. 2) Delivery with MLC leaves abutted behind the jaws as opposed to the midline as planned, leading to a under-dosing of a small volume of the PTV by 25%, by just the boost plan. Due to their error origin, neither of these errors could have been detected by pre-treatment verification. Conclusion: Performing Trajectory Log file analysis could catch typically undetected errors to avoid potentially adverse incidents.« less
Nakamura, R; Sasaki, M; Oikawa, H; Harada, S; Tamakawa, Y
2000-03-01
To use an intranet technique to develop an information system that simultaneously supports both diagnostic reports and radiotherapy planning images. Using a file server as the gateway a radiation oncology LAN was connected to an already operative RIS LAN. Dose-distribution images were saved in tagged-image-file format by way of a screen dump to the file server. X-ray simulator images and portal images were saved in encapsulated postscript format in the file server and automatically converted to portable document format. The files on the file server were automatically registered to the Web server by the search engine and were available for searching and browsing using the Web browser. It took less than a minute to register planning images. For clients, searching and browsing the file took less than 3 seconds. Over 150,000 reports and 4,000 images from a six-month period were accessible. Because the intranet technique was used, construction and maintenance was completed without specialty. Prompt access to essential information about radiotherapy has been made possible by this system. It promotes public access to radiotherapy planning that may improve the quality of treatment.
Construction of the radiation oncology teaching files system for charged particle radiotherapy.
Masami, Mukai; Yutaka, Ando; Yasuo, Okuda; Naoto, Takahashi; Yoshihisa, Yoda; Hiroshi, Tsuji; Tadashi, Kamada
2013-01-01
Our hospital started the charged particle therapy since 1996. New institutions for charged particle therapy are planned in the world. Our hospital are accepting many visitors from those newly planned medical institutions and having many opportunities to provide with the training to them. Based upon our experiences, we have developed the radiation oncology teaching files system for charged particle therapy. We adopted the PowerPoint of Microsoft as a basic framework of our teaching files system. By using our export function of the viewer any physician can create teaching files easily and effectively. Now our teaching file system has 33 cases for clinical and physics contents. We expect that we can improve the safety and accuracy of charged particle therapy by using our teaching files system substantially.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
... November 27, 2012. IV. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory... accordance with the NRC E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires... requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the...
11. "INSTRUMENTATION AND CONTROL SYSTEMS, EQUIPMENT LOCATION, TEST STAND TERMINAL ...
11. "INSTRUMENTATION AND CONTROL SYSTEMS, EQUIPMENT LOCATION, TEST STAND TERMINAL ROOM, PLANS AND SECTION." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 106 of 148; file no. 1321/57. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Onboard Short Term Plan Viewer
NASA Technical Reports Server (NTRS)
Hall, Tim; LeBlanc, Troy; Ulman, Brian; McDonald, Aaron; Gramm, Paul; Chang, Li-Min; Keerthi, Suman; Kivlovitz, Dov; Hadlock, Jason
2011-01-01
Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Takahashi, R; Kamima, T; Tachibana, H
2016-06-15
Purpose: To investigate the effect of the trajectory files from linear accelerator for Clarkson-based independent dose verification in IMRT and VMAT plans. Methods: A CT-based independent dose verification software (Simple MU Analysis: SMU, Triangle Products, Japan) with a Clarksonbased algorithm was modified to calculate dose using the trajectory log files. Eclipse with the three techniques of step and shoot (SS), sliding window (SW) and Rapid Arc (RA) was used as treatment planning system (TPS). In this study, clinically approved IMRT and VMAT plans for prostate and head and neck (HN) at two institutions were retrospectively analyzed to assess the dosemore » deviation between DICOM-RT plan (PL) and trajectory log file (TJ). An additional analysis was performed to evaluate MLC error detection capability of SMU when the trajectory log files was modified by adding systematic errors (0.2, 0.5, 1.0 mm) and random errors (5, 10, 30 mm) to actual MLC position. Results: The dose deviations for prostate and HN in the two sites were 0.0% and 0.0% in SS, 0.1±0.0%, 0.1±0.1% in SW and 0.6±0.5%, 0.7±0.9% in RA, respectively. The MLC error detection capability shows the plans for HN IMRT were the most sensitive and 0.2 mm of systematic error affected 0.7% dose deviation on average. Effect of the MLC random error did not affect dose error. Conclusion: The use of trajectory log files including actual information of MLC location, gantry angle, etc should be more effective for an independent verification. The tolerance level for the secondary check using the trajectory file may be similar to that of the verification using DICOM-RT plan file. From the view of the resolution of MLC positional error detection, the secondary check could detect the MLC position error corresponding to the treatment sites and techniques. This research is partially supported by Japan Agency for Medical Research and Development (AMED)« less
A walk through the planned CS building. M.S. Thesis
NASA Technical Reports Server (NTRS)
Khorramabadi, Delnaz
1991-01-01
Using the architectural plan views of our future computer science building as test objects, we have completed the first stage of a Building walkthrough system. The inputs to our system are AutoCAD files. An AutoCAD converter translates the geometrical information in these files into a format suitable for 3D rendering. Major model errors, such as incorrect polygon intersections and random face orientations, are detected and fixed automatically. Interactive viewing and editing tools are provided to view the results, to modify and clean the model and to change surface attributes. Our display system provides a simple-to-use user interface for interactive exploration of buildings. Using only the mouse buttons, the user can move inside and outside the building and change floors. Several viewing and rendering options are provided, such as restricting the viewing frustum, avoiding wall collisions, and selecting different rendering algorithms. A plan view of the current floor, with the position of the eye point and viewing direction on it, is displayed at all times. The scene illumination can be manipulated, by interactively controlling intensity values for 5 light sources.
A Varian DynaLog file-based procedure for patient dose-volume histogram-based IMRT QA.
Calvo-Ortega, Juan F; Teke, Tony; Moragues, Sandra; Pozo, Miquel; Casals-Farran, Joan
2014-03-06
In the present study, we describe a method based on the analysis of the dynamic MLC log files (DynaLog) generated by the controller of a Varian linear accelerator in order to perform patient-specific IMRT QA. The DynaLog files of a Varian Millennium MLC, recorded during an IMRT treatment, can be processed using a MATLAB-based code in order to generate the actual fluence for each beam and so recalculate the actual patient dose distribution using the Eclipse treatment planning system. The accuracy of the DynaLog-based dose reconstruction procedure was assessed by introducing ten intended errors to perturb the fluence of the beams of a reference plan such that ten subsequent erroneous plans were generated. In-phantom measurements with an ionization chamber (ion chamber) and planar dose measurements using an EPID system were performed to investigate the correlation between the measured dose changes and the expected ones detected by the reconstructed plans for the ten intended erroneous cases. Moreover, the method was applied to 20 cases of clinical plans for different locations (prostate, lung, breast, and head and neck). A dose-volume histogram (DVH) metric was used to evaluate the impact of the delivery errors in terms of dose to the patient. The ionometric measurements revealed a significant positive correlation (R² = 0.9993) between the variations of the dose induced in the erroneous plans with respect to the reference plan and the corresponding changes indicated by the DynaLog-based reconstructed plans. The EPID measurements showed that the accuracy of the DynaLog-based method to reconstruct the beam fluence was comparable with the dosimetric resolution of the portal dosimetry used in this work (3%/3 mm). The DynaLog-based reconstruction method described in this study is a suitable tool to perform a patient-specific IMRT QA. This method allows us to perform patient-specific IMRT QA by evaluating the result based on the DVH metric of the planning CT image (patient DVH-based IMRT QA).
14 CFR 93.341 - Aircraft operations in the DC FRZ.
Code of Federal Regulations, 2010 CFR
2010-01-01
...-assigned discrete transponder code. The pilot must monitor VHF frequency 121.5 or UHF frequency 243.0. (d... authorization must file and activate an IFR or a DC FRZ or a DC SFRA flight plan and transmit a discrete transponder code assigned by an Air Traffic Control facility. Aircraft must transmit the discrete transponder...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orrell, S.; Ralstin, S.
1992-04-01
Many computer security plans specify that only a small percentage of the data processed will be classified. Thus, the bulk of the data on secure systems must be unclassified. Secure limited access sites operating approved classified computing systems sometimes also have a system ostensibly containing only unclassified files but operating within the secure environment. That system could be networked or otherwise connected to a classified system(s) in order that both be able to use common resources for file storage or computing power. Such a system must operate under the same rules as the secure classified systems. It is in themore » nature of unclassified files that they either came from, or will eventually migrate to, a non-secure system. Today, unclassified files are exported from systems within the secure environment typically by loading transport media and carrying them to an open system. Import of unclassified files is handled similarly. This media transport process, sometimes referred to as sneaker net, often is manually logged and controlled only by administrative procedures. A comprehensive system for secure bi-directional transfer of unclassified files between secure and open environments has yet to be developed. Any such secure file transport system should be required to meet several stringent criteria. It is the purpose of this document to begin a definition of these criteria.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orrell, S.; Ralstin, S.
1992-01-01
Many computer security plans specify that only a small percentage of the data processed will be classified. Thus, the bulk of the data on secure systems must be unclassified. Secure limited access sites operating approved classified computing systems sometimes also have a system ostensibly containing only unclassified files but operating within the secure environment. That system could be networked or otherwise connected to a classified system(s) in order that both be able to use common resources for file storage or computing power. Such a system must operate under the same rules as the secure classified systems. It is in themore » nature of unclassified files that they either came from, or will eventually migrate to, a non-secure system. Today, unclassified files are exported from systems within the secure environment typically by loading transport media and carrying them to an open system. Import of unclassified files is handled similarly. This media transport process, sometimes referred to as sneaker net, often is manually logged and controlled only by administrative procedures. A comprehensive system for secure bi-directional transfer of unclassified files between secure and open environments has yet to be developed. Any such secure file transport system should be required to meet several stringent criteria. It is the purpose of this document to begin a definition of these criteria.« less
42 CFR 430.63 - Filing and service of papers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Filing and service of papers. 430.63 Section 430.63... Conformity of State Medicaid Plans and Practice to Federal Requirements § 430.63 Filing and service of papers. (a) Filing. All papers in the proceedings are filed with the CMS Docket Clerk, in an original and two...
42 CFR 430.63 - Filing and service of papers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Filing and service of papers. 430.63 Section 430.63... Conformity of State Medicaid Plans and Practice to Federal Requirements § 430.63 Filing and service of papers. (a) Filing. All papers in the proceedings are filed with the CMS Docket Clerk, in an original and two...
47 CFR 54.313 - Annual reporting requirements for high-cost recipients.
Code of Federal Regulations, 2012 CFR
2012-10-01
... planning with a focus on Tribal community anchor institutions; (ii) Feasibility and sustainability planning... annual report, any ETC that files annual financial reports with the Rural Utilities Service may instead file a copy of its report to the Rural Utilities Service. (g) Areas with No Terrestrial Backhaul...
29 CFR 4043.3 - Requirement of notice.
Code of Federal Regulations, 2011 CFR
2011-07-01
....20 (for post-event notice), § 4043.61 (for advance notice), or § 4043.81 (for Form 200 filings). Any... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.3 Requirement of notice. (a... reportable event occurs for more than one plan, the filing obligation with respect to each plan is...
29 CFR 4043.3 - Requirement of notice.
Code of Federal Regulations, 2010 CFR
2010-07-01
....20 (for post-event notice), § 4043.61 (for advance notice), or § 4043.81 (for Form 200 filings). Any... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.3 Requirement of notice. (a... reportable event occurs for more than one plan, the filing obligation with respect to each plan is...
29 CFR 4043.3 - Requirement of notice.
Code of Federal Regulations, 2012 CFR
2012-07-01
....20 (for post-event notice), § 4043.61 (for advance notice), or § 4043.81 (for Form 200 filings). Any... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.3 Requirement of notice. (a... reportable event occurs for more than one plan, the filing obligation with respect to each plan is...
29 CFR 4043.3 - Requirement of notice.
Code of Federal Regulations, 2014 CFR
2014-07-01
....20 (for post-event notice), § 4043.61 (for advance notice), or § 4043.81 (for Form 200 filings). Any... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.3 Requirement of notice. (a... reportable event occurs for more than one plan, the filing obligation with respect to each plan is...
29 CFR 4043.3 - Requirement of notice.
Code of Federal Regulations, 2013 CFR
2013-07-01
....20 (for post-event notice), § 4043.61 (for advance notice), or § 4043.81 (for Form 200 filings). Any... EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.3 Requirement of notice. (a... reportable event occurs for more than one plan, the filing obligation with respect to each plan is...
40 CFR 305.5 - Filing, service, and form of pleadings and documents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL... SUPERFUND General § 305.5 Filing, service, and form of pleadings and documents. (a) Filing of pleadings and...
40 CFR 305.5 - Filing, service, and form of pleadings and documents.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL... SUPERFUND General § 305.5 Filing, service, and form of pleadings and documents. (a) Filing of pleadings and...
40 CFR 305.5 - Filing, service, and form of pleadings and documents.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL... SUPERFUND General § 305.5 Filing, service, and form of pleadings and documents. (a) Filing of pleadings and...
48 CFR 1511.011-75 - Working files.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Working files. 1511.011-75... PLANNING DESCRIBING AGENCY NEEDS 1511.011-75 Working files. Contracting Officers shall insert the contract clause at 1552.211-75 in all applicable EPA contracts where accurate working files on all work...
ERIC Educational Resources Information Center
Prineau, J. P.
The data system and its branches, computerized in 1970, provide information from the following: student records file, accountancy file, an experimental-stage personnel file, and a planning-stage facilities file. The files not only cope with the university's daily management duties but also supply the French Ministry with statistics. Two types of…
SU-F-T-465: Two Years of Radiotherapy Treatments Analyzed Through MLC Log Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
Defoor, D; Kabat, C; Papanikolaou, N
Purpose: To present treatment statistics of a Varian Novalis Tx using more than 90,000 Varian Dynalog files collected over the past 2 years. Methods: Varian Dynalog files are recorded for every patient treated on our Varian Novalis Tx. The files are collected and analyzed daily to check interfraction agreement of treatment deliveries. This is accomplished by creating fluence maps from the data contained in the Dynalog files. From the Dynalog files we have also compiled statistics for treatment delivery times, MLC errors, gantry errors and collimator errors. Results: The mean treatment time for VMAT patients was 153 ± 86 secondsmore » while the mean treatment time for step & shoot was 256 ± 149 seconds. Patient’s treatment times showed a variation of 0.4% over there treatment course for VMAT and 0.5% for step & shoot. The average field sizes were 40 cm2 and 26 cm2 for VMAT and step & shoot respectively. VMAT beams contained and average overall leaf travel of 34.17 meters and step & shoot beams averaged less than half of that at 15.93 meters. When comparing planned and delivered fluence maps generated using the Dynalog files VMAT plans showed an average gamma passing percentage of 99.85 ± 0.47. Step & shoot plans showed an average gamma passing percentage of 97.04 ± 0.04. 5.3% of beams contained an MLC error greater than 1 mm and 2.4% had an error greater than 2mm. The mean gantry speed for VMAT plans was 1.01 degrees/s with a maximum of 6.5 degrees/s. Conclusion: Varian Dynalog files are useful for monitoring machine performance treatment parameters. The Dynalog files have shown that the performance of the Novalis Tx is consistent over the course of a patients treatment with only slight variations in patient treatment times and a low rate of MLC errors.« less
NASA Technical Reports Server (NTRS)
1987-01-01
The planning program, SWITCH, and its surrounding changed-goal-replanning program, Runaround, are described. The evolution of SWITCH and Runaround from an earlier planner, DEVISER, is recounted. SWITCH's plan representation, and its process of building a plan by backward chaining with strict chronological backtracking, are described. A guide for writing knowledge base files is provided, as are narrative guides for installing the program, running it, and interacting with it while it is running. Some utility functions are documented. For the sake of completeness, a narrative guide to the experimental discrepancy-replanning feature is provided. Appendices contain knowledge base files for a blocksworld domain, and a DRIBBLE file illustrating the output from, and user interaction with, the program in that domain.
SU-F-T-295: MLCs Performance and Patient-Specific IMRT QA Using Log File Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Osman, A; American University of Biuret Medical Center, Biuret; Maalej, N
2016-06-15
Purpose: To analyze the performance of the multi-leaf collimators (MLCs) from the log files recorded during the intensity modulated radiotherapy (IMRT) treatment and to construct the relative fluence maps and do the gamma analysis to compare the planned and executed MLCs movement. Methods: We developed a program to extract and analyze the data from dynamic log files (dynalog files) generated from sliding window IMRT delivery treatments. The program extracts the planned and executed (actual or delivered) MLCs movement, calculates and compares the relative planned and executed fluences. The fluence maps were used to perform the gamma analysis (with 3% dosemore » difference and 3 mm distance to agreement) for 3 IMR patients. We compared our gamma analysis results with those obtained from portal dose image prediction (PDIP) algorithm performed using the EPID. Results: For 3 different IMRT patient treatments, the maximum difference between the planned and the executed MCLs positions was 1.2 mm. The gamma analysis results of the planned and delivered fluences were in good agreement with the gamma analysis from portal dosimetry. The maximum difference for number of pixels passing the gamma criteria (3%/3mm) was 0.19% with respect to portal dosimetry results. Conclusion: MLC log files can be used to verify the performance of the MLCs. Patientspecific IMRT QA based on MLC movement log files gives similar results to EPID dosimetry results. This promising method for patient-specific IMRT QA is fast, does not require dose measurements in a phantom, can be done before the treatment and for every fraction, and significantly reduces the IMRT workload. The author would like to thank King Fahd University of petroleum and Minerals for the support.« less
Quantification of residual dose estimation error on log file-based patient dose calculation.
Katsuta, Yoshiyuki; Kadoya, Noriyuki; Fujita, Yukio; Shimizu, Eiji; Matsunaga, Kenichi; Matsushita, Haruo; Majima, Kazuhiro; Jingu, Keiichi
2016-05-01
The log file-based patient dose estimation includes a residual dose estimation error caused by leaf miscalibration, which cannot be reflected on the estimated dose. The purpose of this study is to determine this residual dose estimation error. Modified log files for seven head-and-neck and prostate volumetric modulated arc therapy (VMAT) plans simulating leaf miscalibration were generated by shifting both leaf banks (systematic leaf gap errors: ±2.0, ±1.0, and ±0.5mm in opposite directions and systematic leaf shifts: ±1.0mm in the same direction) using MATLAB-based (MathWorks, Natick, MA) in-house software. The generated modified and non-modified log files were imported back into the treatment planning system and recalculated. Subsequently, the generalized equivalent uniform dose (gEUD) was quantified for the definition of the planning target volume (PTV) and organs at risks. For MLC leaves calibrated within ±0.5mm, the quantified residual dose estimation errors that obtained from the slope of the linear regression of gEUD changes between non- and modified log file doses per leaf gap are in head-and-neck plans 1.32±0.27% and 0.82±0.17Gy for PTV and spinal cord, respectively, and in prostate plans 1.22±0.36%, 0.95±0.14Gy, and 0.45±0.08Gy for PTV, rectum, and bladder, respectively. In this work, we determine the residual dose estimation errors for VMAT delivery using the log file-based patient dose calculation according to the MLC calibration accuracy. Copyright © 2016 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-25
... retain benefits. Statutory authority for this information collection is contained in 47 U.S.C. sections... Plan for Our Future; Establish Just and Reasonable Rates for Local Exchange Carriers; High-Cost... to file a five-year service quality improvement plan by July 1, 2013, and to file annually thereafter...
Code of Federal Regulations, 2013 CFR
2013-07-01
... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...
Code of Federal Regulations, 2011 CFR
2011-07-01
... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...
Code of Federal Regulations, 2012 CFR
2012-07-01
... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...
Code of Federal Regulations, 2010 CFR
2010-07-01
... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...
Code of Federal Regulations, 2014 CFR
2014-07-01
... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...
28 CFR 16.98 - Exemption of the Drug Enforcement Administration (DEA) Systems-limited access.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Planning and Inspection Division Records (Justice/DEA-010). (4) Operation Files (Justice/DEA-011). (5...); Planning and Inspection Division Records (Justice/DEA-010); and Security Files (Justice/DEA-013..., fabrication of testimony, and/or flight of the subject; reveal the details of a sensitive investigative or...
28 CFR 16.98 - Exemption of the Drug Enforcement Administration (DEA) Systems-limited access.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Planning and Inspection Division Records (Justice/DEA-010). (4) Operation Files (Justice/DEA-011). (5...); Planning and Inspection Division Records (Justice/DEA-010); and Security Files (Justice/DEA-013..., fabrication of testimony, and/or flight of the subject; reveal the details of a sensitive investigative or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Revised filing of updated shoreline management plan as...
SU-F-T-266: Dynalogs Based Evaluation of Different Dose Rate IMRT Using DVH and Gamma Index
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahmed, S; Ahmed, S; Ahmed, F
2016-06-15
Purpose: This work investigates the impact of low and high dose rate on IMRT through Dynalogs by evaluating Gamma Index and Dose Volume Histogram. Methods: The Eclipse™ treatment planning software was used to generate plans on prostate and head and neck sites. A range of dose rates 300 MU/min and 600 MU/min were applied to each plan in order to investigate their effect on the beam ON time, efficiency and accuracy. Each plan had distinct monitor units per fraction, delivery time, mean dose rate and leaf speed. The DVH data was used in the assessment of the conformity and planmore » quality.The treatments were delivered on Varian™ Clinac 2100C accelerator equipped with 120 leaf millennium MLC. Dynalogs of each plan were analyzed by MATLAB™ program. Fluence measurements were performed using the Sun Nuclear™ 2D diode array and results were assessed, based on Gamma analysis of dose fluence maps, beam delivery statistics and Dynalogs data. Results: Minor differences found by adjusted R-squared analysis of DVH’s for all the plans with different dose rates. It has been also found that more and larger fields have greater time reduction at high dose rate and there was a sharp decrease in number of control points observed in dynalog files by switching dose rate from 300 MU/min to 600 MU/min. Gamma Analysis of all plans passes the confidence limit of ≥95% with greater number of passing points in 300 MU/min dose rate plans. Conclusion: The dynalog files are compatible tool for software based IMRT QA. It can work perfectly parallel to measurement based QA setup and stand-by procedure for pre and post delivery of treatment plan.« less
1984-12-01
3Com Corporation ....... A-18 Ethernet Controller Support . . . . . . A-19 Host Systems Support . . . . . . . . . A-20 Personal Computers Support...A-23 VAX EtherSeries Software 0 * A-23 Network Research Corporation . o o o . o A-24 File Transfer Service . . . . o A-25 Virtual Terminal Service 0...Control office is planning to acquire a Digital Equipment Corporation VAX 11/780 mainframe computer with the Unix Berkeley 4.2BSD operating system. They
34. Photocopy of original plan (on file at City of ...
34. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ GENERAL FRAMING PLANS - PIER SHED (Drawing 6 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
31. Photocopy of original plan (on file at City of ...
31. Photocopy of original plan (on file at City of New York Department of Ports International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ GENERAL ARCHITECTURAL PLANS AND ELEVATIONS (Drawing 1 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
48 CFR 1509.170-6 - Filing of forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...
Patient-reported denials, appeals, and complaints: associations with overall plan ratings.
Quigley, Denise D; Haviland, Amelia M; Dembosky, Jacob W; Klein, David J; Elliott, Marc N
2018-03-01
To assess whether Medicare patients' reports of denied care, appeals/complaints, and satisfactory resolution were associated with ratings of their health plan or care. Retrospective analysis of 2010 Medicare Advantage Consumer Assessment of Healthcare Providers and Systems (CAHPS) survey data. Multivariate linear regression of data from 154,766 respondents (61.1% response rate) tested the association of beneficiary ratings of plan and care with beneficiary reports of denied care, appeals, complaints, and complaint resolution, adjusting for beneficiary demographics. Beneficiaries who reported being denied needed care rated their plans and care significantly less positively, by 17.2 points (on a 100-point scale) and 9.1 points, respectively. Filing an appeal was not statistically significantly associated with further lower ratings. Beneficiaries who filed a complaint that was satisfactorily resolved gave slightly lower ratings of plans (-3.4 points) and care (-2.5 points) than those not filing a complaint (P <.001 for all results). Lower ratings from patients reporting complaints and denied care may notably affect the overall 0-10 CAHPS ratings of Medicare Advantage plans. Our results suggest that beneficiaries may attribute the actions that lead to complaints or denials to plans more than to the care they received. Successful complaint resolution and utilization management review might eliminate most deficits associated with complaints and denied care, consistent with the service recovery paradox. High rates of complaints and denied care might identify areas that need improved utilization management review, customer service, and quality improvement. Among those reporting being denied care, filing an appeal was not associated with lower patient ratings of plan or care.
26 CFR 54.6071-1 - Time for filing returns.
Code of Federal Regulations, 2010 CFR
2010-04-01
... section 4980B. (1) Due date for filing of return by employers or other persons responsible for benefits under a group health plan. If the person liable for the excise tax is an employer or other person responsible for providing or administering benefits under a group health plan (such as an insurer or a third...
Flight data file: STS-4 crew activity plan
NASA Technical Reports Server (NTRS)
Pippert, E. B., Jr.
1982-01-01
The STS-4 Crew Activity Plan contains the on-orbit timeline, which is a flight data file article. Various time scales such as Mission Elapsed Time (MET), Greenwich Mean Time (GMT), and time until deorbit ignition as well as crew activities, day/night, orbit position, ground tracking, communication coverage, attitude, and maneuvers are presented in chart form.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70429; File No. S7-24-89] Joint Industry Plan... Collection, Consolidation and Dissemination of Quotation and Transaction Information for Nasdaq-Listed... Exchange, Inc., New York Stock Exchange LLC, NYSE MKT LLC, and NYSE Arca, Inc. September 17, 2013. Pursuant...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... ``Act'').\\3\\ The Plan is primarily designed to, among other things, address extraordinary market... No. 67091 (May 31, 2012) 77 FR 33498 (June 6, 2012). Though the Plan was primarily designed for... filing are, ``No-Bid Series'' which are actually found in Exchange Rule 6.13(b)(vi) and not Exchange Rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... and Immediate Effectiveness of the Second Amendment to the National Market System Plan to Address... 6, 2012) (File No. 4-631) (Order Approving, on a Pilot Basis, the National Market System Plan To... with Trading Pauses to accommodate more fundamental price moves (as opposed to erroneous trades or...
12 CFR 516.45 - What is the filing date of my application?
Code of Federal Regulations, 2010 CFR
2010-01-01
... the following requirements. (1) You attend a pre-filing meeting and submit a draft business plan or... required number of copies with that office. (iii) If you file after the close of business established by a Regional Office or OTS Headquarters, you have filed with that office on the next business day. (3) You pay...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
... Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments Take notice that the....: 2283-064. c. Date Filed: March 25, 2011. d. Applicant: FPL Energy Maine Hydro, LLC. e. Name of Project... Land/Trail Management Plan issued March 25, 2010, FPL Energy Maine Hydro, LLC (licensee) filed an...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... Rule 19d-1(c)(1) of the Act \\3\\ requiring that a self- regulatory organization (``SRO'') promptly file... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68170; File No. 4-655] Self-Regulatory Organizations; BOX Options Exchange LLC; Notice of Filing of Proposed Minor Rule Violation Plan November 6, 2012...
48 CFR 908.7105 - Filing cabinets.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Filing cabinets. 908.7105 Section 908.7105 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7105 Filing cabinets...
NASA Astrophysics Data System (ADS)
Alexander, A.; DeBlois, F.; Stroian, G.; Al-Yahya, K.; Heath, E.; Seuntjens, J.
2007-07-01
Radiotherapy research lacks a flexible computational research environment for Monte Carlo (MC) and patient-specific treatment planning. The purpose of this study was to develop a flexible software package on low-cost hardware with the aim of integrating new patient-specific treatment planning with MC dose calculations suitable for large-scale prospective and retrospective treatment planning studies. We designed the software package 'McGill Monte Carlo treatment planning' (MMCTP) for the research development of MC and patient-specific treatment planning. The MMCTP design consists of a graphical user interface (GUI), which runs on a simple workstation connected through standard secure-shell protocol to a cluster for lengthy MC calculations. Treatment planning information (e.g., images, structures, beam geometry properties and dose distributions) is converted into a convenient MMCTP local file storage format designated, the McGill RT format. MMCTP features include (a) DICOM_RT, RTOG and CADPlan CART format imports; (b) 2D and 3D visualization views for images, structure contours, and dose distributions; (c) contouring tools; (d) DVH analysis, and dose matrix comparison tools; (e) external beam editing; (f) MC transport calculation from beam source to patient geometry for photon and electron beams. The MC input files, which are prepared from the beam geometry properties and patient information (e.g., images and structure contours), are uploaded and run on a cluster using shell commands controlled from the MMCTP GUI. The visualization, dose matrix operation and DVH tools offer extensive options for plan analysis and comparison between MC plans and plans imported from commercial treatment planning systems. The MMCTP GUI provides a flexible research platform for the development of patient-specific MC treatment planning for photon and electron external beam radiation therapy. The impact of this tool lies in the fact that it allows for systematic, platform-independent, large-scale MC treatment planning for different treatment sites. Patient recalculations were performed to validate the software and ensure proper functionality.
28. Photocopy of original plan (on file at City of ...
28. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) dated July 11, 1985 CONTRACT NO. 3960/CITY OF NEW YORK DEPARTMENT OF PORTS AND TERMINALS/DEMOLITION & REMOVAL OF SHEDS OF PIERS 95 AND 96, N.R./ BOROUGH OF. MANHATTAN/ PLANS, PIERHSED & BULKHEAD SHED, PIER 95 - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
29. Photocopy of original plan (on file at City of ...
29. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) dated July 11, 1985 CONTRACT NO. 3960/CITY OF NEW YORK DEPARTMENT OF PORTS AND TERMINALS/DEMOLITION & REMOVAL OF SHEDS OF PIERS 95 AND 96, N.R./ BOROUGH OF MANHATTAN/ PLANS AND SECTIONS, PIER 96 - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
SU-E-T-100: Designing a QA Tool for Enhance Dynamic Wedges Based On Dynalog Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yousuf, A; Hussain, A
2014-06-01
Purpose: A robust quality assurance (QA) program for computer controlled enhanced dynamic wedge (EDW) has been designed and tested. Calculations to perform such QA test is based upon the EDW dynamic log files generated during dose delivery. Methods: Varian record and verify system generates dynamic log (dynalog) files during dynamic dose delivery. The system generated dynalog files contain information such as date and time of treatment, energy, monitor units, wedge orientation, and type of treatment. It also contains the expected calculated segmented treatment tables (STT) and the actual delivered STT for the treatment delivery as a verification record. These filesmore » can be used to assess the integrity and precision of the treatment plan delivery. The plans were delivered with a 6 MV beam from a Varian linear accelerator. For available EDW angles (10°, 15°, 20°, 25°, 30°, 45°, and 60°) Varian STT values were used to manually calculate monitor units for each segment. It can also be used to calculate the EDW factors. Independent verification of fractional MUs per segment was performed against those generated from dynalog files. The EDW factors used to calculate MUs in TPS were dosimetrically verified in solid water phantom with semiflex chamber on central axis. Results: EDW factors were generated from the STT provided by Varian and verified against practical measurements. The measurements were in agreement of the order of 1 % to the calculated EDW data. Variation between the MUs per segment obtained from dynalog files and those manually calculated was found to be less than 2%. Conclusion: An efficient and easy tool to perform routine QA procedure of EDW is suggested. The method can be easily implemented in any institution without a need for expensive QA equipment. An error of the order of ≥2% can be easily detected.« less
Ranade, Manisha K; Lynch, Bart D; Li, Jonathan G; Dempsey, James F
2006-01-01
We have developed an electronic portal imaging device (EPID) employing a fast scintillator and a high-speed camera. The device is designed to accurately and independently characterize the fluence delivered by a linear accelerator during intensity modulated radiation therapy (IMRT) with either step-and-shoot or dynamic multileaf collimator (MLC) delivery. Our aim is to accurately obtain the beam shape and fluence of all segments delivered during IMRT, in order to study the nature of discrepancies between the plan and the delivered doses. A commercial high-speed camera was combined with a terbium-doped gadolinium-oxy-sulfide (Gd2O2S:Tb) scintillator to form an EPID for the unaliased capture of two-dimensional fluence distributions of each beam in an IMRT delivery. The high speed EPID was synchronized to the accelerator pulse-forming network and gated to capture every possible pulse emitted from the accelerator, with an approximate frame rate of 360 frames-per-second (fps). A 62-segment beam from a head-and-neck IMRT treatment plan requiring 68 s to deliver was recorded with our high speed EPID producing approximately 6 Gbytes of imaging data. The EPID data were compared with the MLC instruction files and the MLC controller log files. The frames were binned to provide a frame rate of 72 fps with a signal-to-noise ratio that was sufficient to resolve leaf positions and segment fluence. The fractional fluence from the log files and EPID data agreed well. An ambiguity in the motion of the MLC during beam on was resolved. The log files reported leaf motions at the end of 33 of the 42 segments, while the EPID observed leaf motions in only 7 of the 42 segments. The static IMRT segment shapes observed by the high speed EPID were in good agreement with the shapes reported in the log files. The leaf motions observed during beam-on for step-and-shoot delivery were not temporally resolved by the log files.
48 CFR 1511.011-75 - Working files.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Working files. 1511.011-75 Section 1511.011-75 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-75 Working files. Contracting Officers shall insert the contract...
48 CFR 1511.011-75 - Working files.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Working files. 1511.011-75 Section 1511.011-75 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-75 Working files. Contracting Officers shall insert the contract...
48 CFR 1511.011-75 - Working files.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Working files. 1511.011-75 Section 1511.011-75 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-75 Working files. Contracting Officers shall insert the contract...
48 CFR 1511.011-75 - Working files.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Working files. 1511.011-75 Section 1511.011-75 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-75 Working files. Contracting Officers shall insert the contract...
EEsoF MICAD and ACADEMY macro files for coplanar waveguide and finite ground plan coplanar waveguide
NASA Technical Reports Server (NTRS)
Ponchak, George E.
1995-01-01
A collection of macro files is presented which when appended to either the EEsoF MICAD.ELE or EEsoF ACADEMY.ELE file permits the layout of coplanar waveguide and finite ground plane coplanar waveguide circuits.
29 CFR 2560.502c-5 - Civil penalties under section 502(c)(5).
Code of Federal Regulations, 2011 CFR
2011-07-01
... Act) that is not a group health plan, and that provides benefits consisting of medical care (within... section 502(c)(5) of the Act for each failure or refusal to file a completed report required to be filed...). (2) For purposes of this section, a failure or refusal to file the report required to be filed under...
29 CFR 2560.502c-5 - Civil penalties under section 502(c)(5).
Code of Federal Regulations, 2010 CFR
2010-07-01
... Act) that is not a group health plan, and that provides benefits consisting of medical care (within... section 502(c)(5) of the Act for each failure or refusal to file a completed report required to be filed...). (2) For purposes of this section, a failure or refusal to file the report required to be filed under...
MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM
NASA Technical Reports Server (NTRS)
Callahan, J. D.
1994-01-01
The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users must supply their own graphics primitives to clear the screen, change the color, and connect 2D points with straight lines. Also, the users must tie in the graphics primitives along with their ephemeris readers. (MIP does everything else including clipping.) MIP was developed in 1988.
5 CFR 890.105 - Filing claims for payment or service.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administration and General Provisions § 890.105 Filing claims for payment or service. (a) General. (1) Each health benefits carrier resolves claims filed under the plan. All health benefits claims must be submitted initially to the carrier of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-62602; File No. SR-CBOE-2010-069] Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and Immediate Effectiveness of Proposed Rule Change to Amend Its Minor Rule Violation Plan July 29, 2010. Correction In notice...
27. Photocopy of original plan (on file at City of ...
27. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date FREIGHT SHED/WEST 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ HEATING SYSTEM INSTALLED BY WILLIAM J. OLVANEY (1 of 2 sheets) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
Converting from DDOR SASF to APF
NASA Technical Reports Server (NTRS)
Gladden, Roy E.; Khanampompan, Teerapat; Fisher, Forest W.
2008-01-01
A computer program called ddor_sasf2apf converts delta-door (delta differential one-way range) request from an SASF (spacecraft activity sequence file) format to an APF (apgen plan file) format for use in the Mars Reconnaissance Orbiter (MRO) missionplanning- and-sequencing process. The APF is used as an input to APGEN/AUTOGEN in the MRO activity- planning and command-sequencegenerating process to sequence the delta-door (DDOR) activity. The DDOR activity is a spacecraft tracking technique for determining spacecraft location. The input to ddor_sasf2apf is an input request SASF provided by an observation team that utilizes DDOR. ddor_sasf2apf parses this DDOR SASF input, rearranging parameters and reformatting the request to produce an APF file for use in AUTOGEN and/or APGEN. The benefit afforded by ddor_sasf2apf is to enable the use of the DDOR SASF file earlier in the planning stage of the command-sequence-generating process and to produce sequences, optimized for DDOR operations, that are more accurate and more robust than would otherwise be possible.
NASA Flight Planning Branch Space Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Clevenger, Jennifer D.; Bristol, Douglas J.; Whitney, Gregory R.; Blanton, Mark R.; Reynolds, F. Fisher, III
2011-01-01
Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.
Flight Planning Branch Space Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Price, Jennifer B.; Scott, Tracy A.; Hyde, Crystal M.
2011-01-01
Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.
The basic health care system for the lunar base crew
NASA Astrophysics Data System (ADS)
Terai, Minoru; Nitta, Keiji
A plan of the health care system for the crew on the lunar base is described in this study. The health care system consists of two subsystems. The first is the daily health care system. The system contains health care menus, similar to those on Earth, and some biochemical and ordinary medical examinations. The second system is a periodic medical inspection for the crew's bones and the determination of natural radioisotopes in the body. These care systems are automatically treated with the examination and data filing. Usually these examinations are carried out without the presence of a medical doctor. Examinations and files of the whole results are controlled by a computer. The daily results of examinations are compared with data in the file. If any abnormal values are found in the results, an appropriate message is sent advising whether he must receive an in-depth examination by a medical doctor, or be reexamined by the same submenu. The automatic health care system also records transactions with the life support monitoring system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Temple, Brian Allen; Armstrong, Jerawan Chudoung
This document is a mid-year report on a deliverable for the PYTHON Radiography Analysis Tool (PyRAT) for project LANL12-RS-107J in FY15. The deliverable is deliverable number 2 in the work package and is titled “Add the ability to read in more types of image file formats in PyRAT”. Right now PyRAT can only read in uncompressed TIF files (tiff files). It is planned to expand the file formats that can be read by PyRAT, making it easier to use in more situations. A summary of the file formats added include jpeg, jpg, png and formatted ASCII files.
Converting CSV Files to RKSML Files
NASA Technical Reports Server (NTRS)
Trebi-Ollennu, Ashitey; Liebersbach, Robert
2009-01-01
A computer program converts, into a format suitable for processing on Earth, files of downlinked telemetric data pertaining to the operation of the Instrument Deployment Device (IDD), which is a robot arm on either of the Mars Explorer Rovers (MERs). The raw downlinked data files are in comma-separated- value (CSV) format. The present program converts the files into Rover Kinematics State Markup Language (RKSML), which is an Extensible Markup Language (XML) format that facilitates representation of operations of the IDD and enables analysis of the operations by means of the Rover Sequencing Validation Program (RSVP), which is used to build sequences of commanded operations for the MERs. After conversion by means of the present program, the downlinked data can be processed by RSVP, enabling the MER downlink operations team to play back the actual IDD activity represented by the telemetric data against the planned IDD activity. Thus, the present program enhances the diagnosis of anomalies that manifest themselves as differences between actual and planned IDD activities.
29 CFR 4041.31 - Notice of noncompliance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION... § 4041.23; (ii) The plan administrator failed to issue notices of plan benefits to all affected parties entitled to plan benefits in accordance with § 4041.24; (iii) The plan administrator failed to file the...
Understanding Annuity and Deferred Compensation Plans.
ERIC Educational Resources Information Center
Cifelli, Thomas A.
1987-01-01
Summarizes the rules governing Internal Revenue Code (IRC) section 403 (b) annuity plans and IRC section 427 deferred compensation plans. On balance, the burdensome annual form 550 filing requirement of 403 (b) plans seems more than offset by the disadvantages and increased responsibility associated with 427 plans. (MLH)
77 FR 33788 - Proposed Post Office Structure Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-07
... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
...This document revises the mailing address and web-based submission procedures for filing certain notices under the Department of Labor (Department) Employee Benefits Security Administration's fiduciary-level fee disclosure regulation under section 408(b)(2) of the Employee Retirement Income Security Act of 1974 (ERISA). Responsible plan fiduciaries of employee pension benefit plans must file these notices with the Department to obtain relief from ERISA's prohibited transaction provisions that otherwise may apply when a covered service provider to the plan fails to disclose information in accordance with the regulation's requirements.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-07
...-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing and Immediate Effectiveness of Proposed Rule... Exchange Act of 1934, as amended (the ``Act''). Upon effectiveness of a plan filed pursuant to Rule 17d-2...(a) through 9.25, which concern advertising and sales literature, would be deleted and the text of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-67791; File No. SR-OPRA-2012-05] Options Price Reporting Authority; Notice of Filing and Immediate Effectiveness of Proposed Amendment to the Plan for...'') \\1\\ and Rule 608 thereunder,\\2\\ notice is hereby given that on August 27, 2012, the Options Price...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-69114; File No. SR-ISE-2013-18] Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing of Proposed Rule Change To Address Order Handling Under the Options Order Protection and Locked/Crossed Market Plan, the Authority of the Exchange To Cancel Orders When a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... of Rule 19d-1(c)(1) of the Act \\3\\ requiring that a self- regulatory organization (``SRO'') promptly... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70927; File No. 4-669] Self-Regulatory Organizations; Topaz Exchange, LLC; Notice of Filing of Proposed Minor Rule Violation Plan November 22, 2013...
A Progress Report on Progress Files. The Experience of One Higher Education Institution
ERIC Educational Resources Information Center
East, Rob
2005-01-01
In order to facilitate personal development planning (PDP), the UK higher education sector is committed to introducing progress files. This article explores the experience of one institution in seeking to establish a system of progress files. It identifies the main practical problems in doing this, highlighting the lack of agreement on the skills…
18 CFR 5.11 - Potential Applicant's proposed study plan and study plan meetings.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposed study plan and study plan meetings. 5.11 Section 5.11 Conservation of Power and Water Resources... INTEGRATED LICENSE APPLICATION PROCESS § 5.11 Potential Applicant's proposed study plan and study plan..., including information and study requests, the potential applicant must file with the Commission a proposed...
18 CFR 5.11 - Potential Applicant's proposed study plan and study plan meetings.
Code of Federal Regulations, 2011 CFR
2011-04-01
... proposed study plan and study plan meetings. 5.11 Section 5.11 Conservation of Power and Water Resources... INTEGRATED LICENSE APPLICATION PROCESS § 5.11 Potential Applicant's proposed study plan and study plan..., including information and study requests, the potential applicant must file with the Commission a proposed...
1998-07-01
all the MS Word files into FrameMaker + SGML format and use the FrameMaker application to SGML tag all of the data in accordance with the Army TM...Document Type Definitions (DTDs) in MIL-STD- 2361. The edited SGML tagged files are saved as PDF files for delivery to the field. The FrameMaker ...as TIFF files and being imported into FrameMaker prior to saving the TMs as PDF files. Since the hardware to be used by the AN/PPS-5 technician is
17. Photocopy of Sheet 5 of Building Plan R41A, (USDA, ...
17. Photocopy of Sheet 5 of Building Plan R4-1A, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRAMING PLAN, KITCHEN CABINET PLAN AND BATHTUB ARCH PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
ERIC Educational Resources Information Center
Kotz, Arnold; Redondo, Rory
Presented is the user's manual for the Educational Manpower Information Sources Project (EMAP), an information file containing approximately 325 document abstracts related to the field of educational planning. (The EMAP file is described in document SP 006 747.) (JB)
SU-E-T-142: Automatic Linac Log File: Analysis and Reporting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gainey, M; Rothe, T
Purpose: End to end QA for IMRT/VMAT is time consuming. Automated linac log file analysis and recalculation of daily recorded fluence, and hence dose, distribution bring this closer. Methods: Matlab (R2014b, Mathworks) software was written to read in and analyse IMRT/VMAT trajectory log files (TrueBeam 1.5, Varian Medical Systems) overnight, and are archived on a backed-up network drive (figure). A summary report (PDF) is sent by email to the duty linac physicist. A structured summary report (PDF) for each patient is automatically updated for embedding into the R&V system (Mosaiq 2.5, Elekta AG). The report contains cross-referenced hyperlinks to easemore » navigation between treatment fractions. Gamma analysis can be performed on planned (DICOM RTPlan) and treated (trajectory log) fluence distributions. Trajectory log files can be converted into RTPlan files for dose distribution calculation (Eclipse, AAA10.0.28, VMS). Results: All leaf positions are within +/−0.10mm: 57% within +/−0.01mm; 89% within 0.05mm. Mean leaf position deviation is 0.02mm. Gantry angle variations lie in the range −0.1 to 0.3 degrees, mean 0.04 degrees. Fluence verification shows excellent agreement between planned and treated fluence. Agreement between planned and treated dose distribution, the derived from log files, is very good. Conclusion: Automated log file analysis is a valuable tool for the busy physicist, enabling potential treated fluence distribution errors to be quickly identified. In the near future we will correlate trajectory log analysis with routine IMRT/VMAT QA analysis. This has the potential to reduce, but not eliminate, the QA workload.« less
Zeng, G; Murphy, J; Annis, S-L; Wu, X; Wang, Y; McGowan, T; Macpherson, M
2012-07-01
To report a quality control program in prostate radiation therapy at our center that includes semi-automated planning process to generate high quality plans and in-house software to track plan quality in the subsequent clinical application. Arc planning in Eclipse v10.0 was preformed for both intact prostate and post-prostatectomy treatments. The planning focuses on DVH requirements and dose distributions being able to tolerate daily setup variations. A modified structure set is used to standardize the optimization, including short rectum and bladder in the fields to effectively tighten dose to target and a rectum expansion with 1cm cropped from PTV to block dose and shape posterior isodose lines. Structure, plan and optimization templates are used to streamline plan generation. DVH files are exported from Eclipse to a quality tracking software with GUI written in Matlab that can report the dose-volume data either for an individual patient or over a patient population. For 100 intact prostate patients treated with 78Gy, rectal D50, D25, D15 and D5 are 30.1±6.2Gy, 50.6±7.9Gy, 65.9±6.0Gy and 76.6±1.4Gy respectively, well below the limits 50Gy, 65Gy, 75Gy and 78Gy respectively. For prostate bed with prescription of 66Gy, rectal D50 is 35.9±6.9Gy. In both sites, PTV is covered by 95% prescription and the hotspots are less than 5%. The semi-automated planning method can efficiently create high quality plans while the tracking software can monitor the feedback from clinical application. It is a comprehensive and robust quality control program in radiation therapy. © 2012 American Association of Physicists in Medicine.
Application of real-time cooperative editing in urban planning management system
NASA Astrophysics Data System (ADS)
Jing, Changfeng; Liu, Renyi; Liu, Nan; Bao, Weizheng
2007-06-01
With the increasing of business requirement of urban planning bureau, co-edit function is needed urgently, however conventional GIS are not support this. In order to overcome this limitation, a new kind urban 1planning management system with co-edit function is needed. Such a system called PM2006 has been used in Suzhou Urban Planning Bureau. PM2006 is introduced in this paper. In this paper, four main issues of Co-edit system--consistency, responsiveness time, data recoverability and unconstrained operation--were discussed. And for these four questions, resolutions were put forward in paper. To resolve these problems of co-edit GIS system, a data model called FGDB (File and ESRI GeoDatabase) that is mixture architecture of File and ESRI Geodatabase was introduced here. The main components of FGDB data model are ESRI versioned Geodatabase and replicated architecture. With FGDB, client responsiveness, spatial data recoverability and unconstrained operation were overcome. In last of paper, MapServer, the co-edit map server module, is presented. Main functions of MapServer are operation serialization and spatial data replication between file and versioned data.
36. Photocopy of original plan (on file at City of ...
36. Photocopy of original plan (on file at City of New York Department of Ports, International Trade and Commerce) no date CONTRACT 1519//CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ SIDE FRAMING OF PIER SHED (Drawing 10 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
37. Photocopy of original plan (on file at City of ...
37. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ STAIRWAY AND WAITING ROOM FRAMING (Drawing 13 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
35. Photocopy of original plan (on file at City of ...
35. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ CROSS SECTION AND DETAILS - PIER SHED (Drawing 8 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
33. Photocopy of original plan (on file at City of ...
33. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ BULKHEAD AND WAITING ROOM DETAILS (Drawing 3 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
32. Photocopy of original plan (on file at City of ...
32. Photocopy of original plan (on file at City of New York Department of Ports International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ INSHORE AND OUTSHORE ELEVATIONS (Drawing 2 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
38. Photocopy of original plan (on file at City of ...
38. Photocopy of original plan (on file at City of New York Department of Ports, International Trade, and Commerce) no date CONTRACT 1519/CITY OF NEW YORK/DEPARTMENT OF DOCKS AND FERRIES/ FREIGHT SHED/ W. 55TH ST. IMPROVEMENT/BOROUGH OF MANHATTAN/ WATER SUPPLY AND HEATING (Drawing 16 of 16) - West 55th Street & West 56th Street Piers, Hudson River at West Fifty-fifth & West Fifty-sixth Streets, Manhattan, New York County, NY
29 CFR 4231.5 - Valuation requirement.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., TERMINATION, AND OTHER RULES APPLICABLE TO MULTIEMPLOYER PLANS MERGERS AND TRANSFERS BETWEEN MULTIEMPLOYER... plan, or that is a significantly affected plan only because the merger or transfer involves a plan that... years before the date on which the notice of the merger or transfer is filed. (b) Significantly affected...
40 CFR 75.62 - Monitoring plan submittals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...
18 CFR 50.5 - Pre-filing procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ELECTRIC TRANSMISSION FACILITIES § 50.5 Pre-filing procedures. (a) Introduction. Any applicant seeking a... consultations, project engineering, route planning, environmental and engineering contractor engagement... proceeding. This description also must include the identification of the environmental and engineering firms...
26 CFR 301.6692-1 - Failure to file actuarial report.
Code of Federal Regulations, 2011 CFR
2011-04-01
... enrolled actuary (see § 301.6059-1(d)) is considered a material item of information. Further, for any report filed for a plan year ending after January 25, 1982, if the actuary seeks to materially qualify a...
26 CFR 301.6692-1 - Failure to file actuarial report.
Code of Federal Regulations, 2012 CFR
2012-04-01
... enrolled actuary (see § 301.6059-1(d)) is considered a material item of information. Further, for any report filed for a plan year ending after January 25, 1982, if the actuary seeks to materially qualify a...
26 CFR 301.6692-1 - Failure to file actuarial report.
Code of Federal Regulations, 2013 CFR
2013-04-01
... enrolled actuary (see § 301.6059-1(d)) is considered a material item of information. Further, for any report filed for a plan year ending after January 25, 1982, if the actuary seeks to materially qualify a...
26 CFR 301.6692-1 - Failure to file actuarial report.
Code of Federal Regulations, 2014 CFR
2014-04-01
... enrolled actuary (see § 301.6059-1(d)) is considered a material item of information. Further, for any report filed for a plan year ending after January 25, 1982, if the actuary seeks to materially qualify a...
Developing Database Files for Student Use.
ERIC Educational Resources Information Center
Warner, Michael
1988-01-01
Presents guidelines for creating student database files that supplement classroom teaching. Highlights include determining educational objectives, planning the database with computer specialists and subject area specialists, data entry, and creating student worksheets. Specific examples concerning elements of the periodic table and…
26 CFR 301.6692-1 - Failure to file actuarial report.
Code of Federal Regulations, 2010 CFR
2010-04-01
... enrolled actuary (see § 301.6059-1(d)) is considered a material item of information. Further, for any report filed for a plan year ending after January 25, 1982, if the actuary seeks to materially qualify a...
Albemarle County/City of Charlottesville transportation planning compact disc.
DOT National Transportation Integrated Search
1998-06-01
This report describes transportation planning data, available in numerous files and formats stored on the accompanying compact disc, that were compiled from planning studies for the Charlottesville/Albemarle area done in 1967, 1979, and 1990. These d...
49 CFR 244.1 - Scope, application, and purpose.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD... part prescribes requirements for filing and implementing a Safety Integration Plan with FRA whenever a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Washington, DC Metropolitan Area Special Flight Rules Area § 93.335 Definitions. For purposes of this subpart— DC FRZ flight plan is a flight plan filed... the DC FRZ. This flight plan is separate and distinct from a standard VFR flight plan, and does not...
14 CFR 99.11 - ADIZ flight plan requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false ADIZ flight plan requirements. 99.11... flight plan requirements. (a) No person may operate an aircraft into, within, or from a departure point within an ADIZ, unless the person files, activates, and closes a flight plan with the appropriate...
14 CFR 99.11 - ADIZ flight plan requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false ADIZ flight plan requirements. 99.11... flight plan requirements. (a) No person may operate an aircraft into, within, or from a departure point within an ADIZ, unless the person files, activates, and closes a flight plan with the appropriate...
18 CFR 5.12 - Comments on proposed study plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... study plan. 5.12 Section 5.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... PROCESS § 5.12 Comments on proposed study plan. Comments on the potential applicant's proposed study plan, including any revised information or study requests, must be filed within 90 days after the proposed study...
14 CFR 415.41 - Accident investigation plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Accident investigation plan. 415.41 Section... Launch Range § 415.41 Accident investigation plan. An applicant must file an accident investigation plan... reporting and responding to launch accidents, launch incidents, or other mishaps, as defined by § 401.5 of...
14 CFR 415.41 - Accident investigation plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Accident investigation plan. 415.41 Section... Launch Range § 415.41 Accident investigation plan. An applicant must file an accident investigation plan... reporting and responding to launch accidents, launch incidents, or other mishaps, as defined by § 401.5 of...
Code of Federal Regulations, 2012 CFR
2012-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
2001-07-09
This action delays for at least six months and not more than one year the applicability date for the regulation governing minimum requirements for benefit claims procedures of group health plans covered by Title I of the Employee Retirement Income Security Act. As published on November 21, 2000, the benefit claims procedure would be applicable to claims filed on or after January 1, 2002. The current action amends the regulation so that it will apply to group health claims filed on or after the first day of the first plan year beginning on or after July 1, 2002, but in no event later than January 1, 2003. This action provides a limited additional period within which group health plan sponsors, administrators, and service providers can bring their claims processing systems into compliance with the new requirements. A postponement of the applicability date with respect to group health claims will allow a more orderly transition to the new standards and will avoid the confusion and additional expense that would be caused if certain pending Congressional bills are enacted before or soon after the original applicability date. This action does not apply to pension plans or plans providing disability or welfare benefits (other than group health). For these plans, the regulation will continue to be applicable to claims filed on or after January 1, 2002.
6. Photocopy of pencil drawing (on file at La Grande ...
6. Photocopy of pencil drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1939 CIRCULATION PLAN - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
Chabot, Marina J.; Navarro, Sandy; Swann, Diane; Darney, Philip; Thiel de Bocanegra, Heike
2014-01-01
Objectives. We examined the association of adolescent birthrates (ABRs) with access to and receipt of publicly funded family planning services in California counties provided through 2 state programs: Medi-Cal, California’s Medicaid program, and the Family Planning, Access, Care, and Treatment (Family PACT) program. Methods. Our key data sources included the California Health Interview Survey and California Women’s Health Survey, Medi-Cal and Family PACT claims data, and the Birth Statistical Master File. We constructed a linear regression analysis measuring the relationship of access to and receipt of family planning services with ABRs when controlling for counties’ select covariates. Results. The regression analysis indicated that a higher access rate to Family PACT in a county was associated with a lower ABR (B = −0.19; P < .01) when controlling for unemployment rate, percentage of foreign-born adolescents, and percentage of adult low-income births. Conclusions. Efforts to reduce ABRs, specifically in counties that had persistently high rates are critical to achieving a healthy future for the state and the nation. Family PACT played a crucial role in helping adolescents avoid unintended and early childbearing. PMID:24354841
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mullins, J; Asiev, K; DeBlois, F
2014-08-15
The TrueBeam linear accelerator platform has a developer's mode which permits the user dynamic control over many of the machine's mechanical and radiation systems. Using this research tool, synchronous couch and gantry motion can be programmed to simulate isocentric treatment with a shortened SAD, with benefits such as smaller projected MLC leaf widths and an increased dose rate. In this work, water tank measurements were used to commission a virtual linear accelerator with an 85 cm SAD in Eclipse, from which several arc-based radiotherapy treatments were generated, including an inverse optimized VMAT delivery. For each plan, the pertinent treatment deliverymore » information was extracted from control points specified in the Eclipse-exported DICOM files using the pydicom package in Python, allowing construction of an XML control file. The dimensions of the jaws and MLC positions, defined for an 85 cm SAD in Eclipse, were scaled for delivery on a conventional SAD linear accelerator, and translational couch motion was added as a function of gantry angle to simulate delivery at 85 cm SAD. Ionization chamber and Gafchromic film measurements were used to compare the radiation delivery to dose calculations in Eclipse. With the exception of the VMAT delivery, ionization chamber measurements agreed within 3.3% of the Eclipse calculations. For the VMAT delivery, the ionization chamber was located in an inhomogeneous region, but gamma evaluation of the Gafchromic film plane resulted in a 94.5% passing rate using criteria of 3 mm/3%. The results indicate that Eclipse calculation infrastructure can be used.« less
A novel method for routine quality assurance of volumetric-modulated arc therapy.
Wang, Qingxin; Dai, Jianrong; Zhang, Ke
2013-10-01
Volumetric-modulated arc therapy (VMAT) is delivered through synchronized variation of gantry angle, dose rate, and multileaf collimator (MLC) leaf positions. The delivery dynamic nature challenges the parameter setting accuracy of linac control system. The purpose of this study was to develop a novel method for routine quality assurance (QA) of VMAT linacs. ArcCheck is a detector array with diodes distributing in spiral pattern on cylindrical surface. Utilizing its features, a QA plan was designed to strictly test all varying parameters during VMAT delivery on an Elekta Synergy linac. In this plan, there are 24 control points. The gantry rotates clockwise from 181° to 179°. The dose rate, gantry speed, and MLC positions cover their ranges commonly used in clinic. The two borders of MLC-shaped field seat over two columns of diodes of ArcCheck when the gantry rotates to the angle specified by each control point. The ratio of dose rate between each of these diodes and the diode closest to the field center is a certain value and sensitive to the MLC positioning error of the leaf crossing the diode. Consequently, the positioning error can be determined by the ratio with the help of a relationship curve. The time when the gantry reaches the angle specified by each control point can be acquired from the virtual inclinometer that is a feature of ArcCheck. The gantry speed between two consecutive control points is then calculated. The aforementioned dose rate is calculated from an acm file that is generated during ArcCheck measurements. This file stores the data measured by each detector in 50 ms updates with each update in a separate row. A computer program was written in MATLAB language to process the data. The program output included MLC positioning errors and the dose rate at each control point as well as the gantry speed between control points. To evaluate this method, this plan was delivered for four consecutive weeks. The actual dose rate and gantry speed were compared with the QA plan specified. Additionally, leaf positioning errors were intentionally introduced to investigate the sensitivity of this method. The relationship curves were established for detecting MLC positioning errors during VMAT delivery. For four consecutive weeks measured, 98.4%, 94.9%, 89.2%, and 91.0% of the leaf positioning errors were within ± 0.5 mm, respectively. For the intentionally introduced leaf positioning systematic errors of -0.5 and +1 mm, the detected leaf positioning errors of 20 Y1 leaf were -0.48 ± 0.14 and 1.02 ± 0.26 mm, respectively. The actual gantry speed and dose rate closely followed the values specified in the VMAT QA plan. This method can assess the accuracy of MLC positions and the dose rate at each control point as well as the gantry speed between control points at the same time. It is efficient and suitable for routine quality assurance of VMAT.
Lawlor, Debbie A; Peters, Tim J; Howe, Laura D; Noble, Sian M; Kipping, Ruth R; Jago, Russell
2013-07-24
The Active For Life Year 5 (AFLY5) randomised controlled trial protocol was published in this journal in 2011. It provided a summary analysis plan. This publication is an update of that protocol and provides a detailed analysis plan. This update provides a detailed analysis plan of the effectiveness and cost-effectiveness of the AFLY5 intervention. The plan includes details of how variables will be quality control checked and the criteria used to define derived variables. Details of four key analyses are provided: (a) effectiveness analysis 1 (the effect of the AFLY5 intervention on primary and secondary outcomes at the end of the school year in which the intervention is delivered); (b) mediation analyses (secondary analyses examining the extent to which any effects of the intervention are mediated via self-efficacy, parental support and knowledge, through which the intervention is theoretically believed to act); (c) effectiveness analysis 2 (the effect of the AFLY5 intervention on primary and secondary outcomes 12 months after the end of the intervention) and (d) cost effectiveness analysis (the cost-effectiveness of the AFLY5 intervention). The details include how the intention to treat and per-protocol analyses were defined and planned sensitivity analyses for dealing with missing data. A set of dummy tables are provided in Additional file 1. This detailed analysis plan was written prior to any analyst having access to any data and was approved by the AFLY5 Trial Steering Committee. Its publication will ensure that analyses are in accordance with an a priori plan related to the trial objectives and not driven by knowledge of the data. ISRCTN50133740.
47 CFR 101.4 - Transition plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...
47 CFR 101.4 - Transition plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...
47 CFR 101.4 - Transition plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...
47 CFR 101.4 - Transition plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...
47 CFR 101.4 - Transition plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...
40 CFR 304.30 - Filing of pleadings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Filing of pleadings. 304.30 Section 304.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS ARBITRATION PROCEDURES FOR SMALL SUPERFUND COST RECOVERY...
40 CFR 304.30 - Filing of pleadings.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Filing of pleadings. 304.30 Section 304.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS ARBITRATION PROCEDURES FOR SMALL SUPERFUND COST RECOVERY...
40 CFR 304.30 - Filing of pleadings.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Filing of pleadings. 304.30 Section 304.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS ARBITRATION PROCEDURES FOR SMALL SUPERFUND COST RECOVERY...
24. Photocopy of scale drawing (from Station 'L' office files, ...
24. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, c.1960 GENERAL SITE PLAN OF STATION 'L' - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
5. Photocopy of blue line drawing (on file at La ...
5. Photocopy of blue line drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1939 TREE PLANTING MASTER PLAN - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
7. Photocopy of blue line drawing (on file at La ...
7. Photocopy of blue line drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1965 MASTER SITE DEVELOPMENT PLAN - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
11. Photocopy of architectural drawing (on file at La Grande ...
11. Photocopy of architectural drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1939 OFFICE, DETAILED PLANTING PLAN - Union Ranger District Compound, Office, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
Functional Gap Analysis of the Maritime Operations Centers
2009-12-01
Messaging Services TBMCS , DJC2 MI.1.3.5 Manage Suspense Control Capability Gap MI.1.3.6 Provide Component IM Cell Services Capability Gap MI.1.4 Provide...Admin Support MSRT MI.1.3.3 Manage Electronic File Plan Capability Gap MI.1.3.4 Manage Messaging Services TBMCS , DJC2 MI.1.3.5 Manage Suspense...1.5.9 Execute C4 Policies & Procedures for the Joint Operations Area GCCS-J, DCGS-N, TBMCS , CENTRIX-M EHQ.1.11 Sub Component Interagency
ERIC Educational Resources Information Center
Earl, Lorna L.
This series of manuals describing and illustrating the Statistical Package for the Social Sciences (SPSS) was planned as a self-teaching instrument, beginning with the basics and progressing to an advanced level. Information on what the searcher must know to define the data and write a program for preliminary analysis is contained in manual 1,…
Hydrologic data-verification management program plan
Alexander, C.W.
1982-01-01
Data verification refers to the performance of quality control on hydrologic data that have been retrieved from the field and are being prepared for dissemination to water-data users. Water-data users now have access to computerized data files containing unpublished, unverified hydrologic data. Therefore, it is necessary to develop techniques and systems whereby the computer can perform some data-verification functions before the data are stored in user-accessible files. Computerized data-verification routines can be developed for this purpose. A single, unified concept describing master data-verification program using multiple special-purpose subroutines, and a screen file containing verification criteria, can probably be adapted to any type and size of computer-processing system. Some traditional manual-verification procedures can be adapted for computerized verification, but new procedures can also be developed that would take advantage of the powerful statistical tools and data-handling procedures available to the computer. Prototype data-verification systems should be developed for all three data-processing environments as soon as possible. The WATSTORE system probably affords the greatest opportunity for long-range research and testing of new verification subroutines. (USGS)
NASA Astrophysics Data System (ADS)
Deshpande, Ruchi; Thuptimdang, Wanwara; DeMarco, John; Liu, Brent J.
2014-03-01
We have built a decision support system that provides recommendations for customizing radiation therapy treatment plans, based on patient models generated from a database of retrospective planning data. This database consists of relevant metadata and information derived from the following DICOM objects - CT images, RT Structure Set, RT Dose and RT Plan. The usefulness and accuracy of such patient models partly depends on the sample size of the learning data set. Our current goal is to increase this sample size by expanding our decision support system into a collaborative framework to include contributions from multiple collaborators. Potential collaborators are often reluctant to upload even anonymized patient files to repositories outside their local organizational network in order to avoid any conflicts with HIPAA Privacy and Security Rules. We have circumvented this problem by developing a tool that can parse DICOM files on the client's side and extract de-identified numeric and text data from DICOM RT headers for uploading to a centralized system. As a result, the DICOM files containing PHI remain local to the client side. This is a novel workflow that results in adding only relevant yet valuable data from DICOM files to the centralized decision support knowledge base in such a way that the DICOM files never leave the contributor's local workstation in a cloud-based environment. Such a workflow serves to encourage clinicians to contribute data for research endeavors by ensuring protection of electronic patient data.
43 CFR 3183.6 - Plan of development.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan of development. 3183.6 Section 3183.6... Filing and Approval of Documents § 3183.6 Plan of development. Three counterparts of all plans of development and operation shall be submitted for approval under an approved agreement. [48 FR 26766, June 10...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
... (Business Continuity and Contingency Plans) and adopt new Rule 4370--NYSE Amex Equities (Business Continuity... Continuity and Contingency Plans) as substantively duplicative of NASD Rules 3510 (Business Continuity Plans... Equities (Business Continuity and Contingency Plans) to remove the existing text and incorporate NASD Rules...
NASA's OCA Mirroring System: An Application of Multiagent Systems in Mission Control
NASA Technical Reports Server (NTRS)
Sierhuis, Maarten; Clancey, William J.; vanHoof, Ron J. J.; Seah, Chin H.; Scott, Michael S.; Nado, Robert A.; Blumenberg, Susan F.; Shafto, Michael G.; Anderson, Brian L.; Bruins, Anthony C.;
2009-01-01
Orbital Communications Adaptor (OCA) Flight Controllers, in NASA's International Space Station Mission Control Center, use different computer systems to uplink, downlink, mirror, archive, and deliver files to and from the International Space Station (ISS) in real time. The OCA Mirroring System (OCAMS) is a multiagent software system (MAS) that is operational in NASA's Mission Control Center. This paper presents OCAMS and its workings in an operational setting where flight controllers rely on the system 24x7. We also discuss the return on investment, based on a simulation baseline, six months of 24x7 operations at NASA Johnson Space Center in Houston, Texas, and a projection of future capabilities. This paper ends with a discussion of the value of MAS and future planned functionality and capabilities.
12 CFR 563b.115 - How will OTS review my business plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 5 2010-01-01 2010-01-01 false How will OTS review my business plan? 563b.115... business plan? (a) OTS will review your business plan to determine that it demonstrates a safe and sound... will be determinative. OTS will review every case on its merits. (b) You must file your business plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...
Development of an automated pre-sampling plan for construction projects : final report.
DOT National Transportation Integrated Search
1983-03-01
The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...
78 FR 53704 - Employee Retirement Benefit Plan Returns Required on Magnetic Media
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... at (202) 622-7180 (not toll-free numbers). SUPPLEMENTARY INFORMATION: Background Electronic filing of... Actuarial Information,'' and the Schedule MB, ``Multiemployer Defined Benefit Plan and Certain Money... its successor). (ii) Multiemployer and certain money purchase plans. For multiemployer and certain...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... Activities: Cargo Manifest/ Declaration, Stow Plan, Container Status Messages and Importer Security Filing... concerning the following information collection. Title: Cargo Manifest/Declaration, Stow Plan, Container... and other Federal agencies to comment on an information collection requirement concerning the Cargo...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... Activities: Cargo Manifest/ Declaration, Stow Plan, Container Status Messages and Importer Security Filing... the Paperwork Reduction Act: Cargo Manifest/Declaration, Stow Plan, Container Status Messages and..., mechanical, or other technological techniques or other forms of information. Title: Cargo Manifest...
10. Photocopy of Sheet 2 of Building Plan R451, (USDA, ...
10. Photocopy of Sheet 2 of Building Plan R4-51, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) Framing and Foundation Plans. - Buffalo Guard Station, Office, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
Development of a master file of essential highway safety planning and evaluation data.
DOT National Transportation Integrated Search
1978-01-01
The National Highway Traffic Safety Administration requires each state to file an Annual Highway Safety Work Program as a prerequisite for obtaining federal section 402 safety monies. However, the work program serves as more than a mechanism for obta...
Maintaining Research Documents with Database Management Software.
ERIC Educational Resources Information Center
Harrington, Stuart A.
1999-01-01
Discusses taking notes for research projects and organizing them into card files; reviews the literature on personal filing systems; introduces the basic process of database management; and offers a plan for managing research notes. Describes field groups and field definitions, data entry, and creating reports. (LRW)
40 CFR 303.33 - Filing a claim.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Filing a claim. 303.33 Section 303.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND...
40 CFR 303.33 - Filing a claim.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Filing a claim. 303.33 Section 303.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND...
40 CFR 303.33 - Filing a claim.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Filing a claim. 303.33 Section 303.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND...
40 CFR 303.33 - Filing a claim.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Filing a claim. 303.33 Section 303.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND...
40 CFR 303.33 - Filing a claim.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Filing a claim. 303.33 Section 303.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND...
4. Photocopy of blue line drawing (on file at La ...
4. Photocopy of blue line drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1938 SITE PLAN, UNION RANGER STATION - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
8. Photocopy of blue line drawing (on file at La ...
8. Photocopy of blue line drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1939 DETAIL PLANTING PLAN, SERVICE BUILDINGS - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
7. Photocopy of architectural drawing (on file at La Grande ...
7. Photocopy of architectural drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1939 RANGERS RESIDENCE, DETAILED PLANTING PLAN - Union Ranger Distric Compound, Rangers Residence, Fronting State Highway 203, at West edge of Union, Union, Union County, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Organization Plan Governing the Collection, Consolidation and Dissemination of Quotation and Transaction...., EDGA Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self-Regulatory Organization Plan Governing the Collection, Consolidation, and Dissemination of...
Progress on the development of a master file of highway safety planning and evaluation data.
DOT National Transportation Integrated Search
1981-01-01
The National Highway Traffic Safety Administration requires each state to submit an annual Highway Safety Plan as a prerequisite for obtaining federal section 402 safety monies. The Highway Safety Plan serves as more than a mechanism for obtaining fu...
12. Photocopy of Sheet 5 of Building Plan R453 (USDA, ...
12. Photocopy of Sheet 5 of Building Plan R4-53 (USDA, Forest Service Intermountain Region, Ogden. File 7300, 'Buildings'.) PLAN OF KITCHEN CABINETS AND CONSTRUCTION DETAILS - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
6. Photocopy of Sheet 3 of Building Plan R421, (USDA, ...
6. Photocopy of Sheet 3 of Building Plan R4-21, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings') FRAMING PLAN AND GARAGE DOOR DETAIL - Buffalo Guard Station, Garage, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
15. Photocopy of Sheet 1 of Building Plan R41A, (USDA, ...
15. Photocopy of Sheet 1 of Building Plan R4-1A, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRONT ELEVATION AND FLOOR PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
10. Photocopy of Sheet 1 of Building Plan R453 (USDA, ...
10. Photocopy of Sheet 1 of Building Plan R4-53 (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRONT AND SIDE ELEVATIONS AND FLOOR PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
75 FR 41899 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-19
... of meetings, files of the Chairman, public relations files, plans and drawings, and records relating... disposal or reduce the retention period of records already authorized for disposal. NARA invites public..., this public notice lists the organizational unit(s) accumulating the records or indicates agency-wide...
55. Photocopy of scale diagram (from Station 'L' office files, ...
55. Photocopy of scale diagram (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 1926 PLAN DEPICTING THE LOCATION OF THE CONDENSATE UNITS BUILDING L1 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
29 CFR 4043.6 - Date of filing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.6 Date of filing. (a) Post-Event notice... regular business day following the notice date, in the case of post-event notice. [61 FR 63989, Dec. 2...
29 CFR 4043.6 - Date of filing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.6 Date of filing. (a) Post-Event notice... regular business day following the notice date, in the case of post-event notice. [61 FR 63989, Dec. 2...
29 CFR 4043.6 - Date of filing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.6 Date of filing. (a) Post-Event notice... regular business day following the notice date, in the case of post-event notice. [61 FR 63989, Dec. 2...
29 CFR 4043.6 - Date of filing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.6 Date of filing. (a) Post-Event notice... regular business day following the notice date, in the case of post-event notice. [61 FR 63989, Dec. 2...
29 CFR 4043.6 - Date of filing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS General Provisions § 4043.6 Date of filing. (a) Post-Event notice... regular business day following the notice date, in the case of post-event notice. [61 FR 63989, Dec. 2...
27. Photographic copy of Mezzanine Plan, Roof Plan and Details ...
27. Photographic copy of Mezzanine Plan, Roof Plan and Details (The Ballinger Company, April 12, 1955). In files of the City of Philadelphia, Division of Aviation, Terminal E, Philadelphia International Airport. Reprinted with permission of the Division of Aviation. - TWA Maintenance Hangar, South side of Tinicum Island Road, Philadelphia International Airport, Philadelphia, Philadelphia County, PA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... of Operations of the Regulation NMS Plan To Address Extraordinary Market Volatility or February 4... earlier of the initial date of operations of the Regulation NMS Plan to Address Extraordinary Market... operations on February 4, 2013 as currently planned, but will be delayed. If the Regulation NMS Plan to...
3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...
3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-13
... processor to create and make available depth-of-book displays; the incorporation into the Plan of the... Elizabeth Murphy, Secretary, Commission, dated February 26, 2010. \\6\\ The complete text of the Plan, as... to submit its projected capacity needs directly to the Plan's Processor. The process avoids any need...
17 CFR 210.6A-04 - Statements of income and changes in plan equity.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Statements of income and..., Savings and Similar Plans § 210.6A-04 Statements of income and changes in plan equity. Statements of income and changes in plan equity filed under this rule shall comply with the following provisions: 1...
17 CFR 210.6A-04 - Statements of income and changes in plan equity.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false Statements of income and..., Savings and Similar Plans § 210.6A-04 Statements of income and changes in plan equity. Statements of income and changes in plan equity filed under this rule shall comply with the following provisions: 1...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... National Market System Plan to Address Extraordinary Market Volatility \\7\\ (the ``Limit Up-Limit Down Plan... commencement of operations of the Limit Up- Limit Down Plan. The Exchange believes that continuing the pilot... further experience operating the Limit Up-Limit Down Plan. \\3\\ Securities Exchange Act Release No. 62886...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... System of Records; EPA Parking Control Office File (EPA-10) and EPA Transit and Guaranteed Ride Home Program Files (EPA-35) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency (EPA) is deleting the systems of records for EPA Parking Control Office File...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-23
... welfare plans (collectively referred to as employee benefit plans) to file returns or reports annually... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information Collection Request Submitted for Public Comment; Form 5500, Annual Return/Report of Employee Benefit Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-20
... to the Restated Consolidated Quotation Plan September 14, 2010. Pursuant to Section 11A of the... August 27, 2010, the Consolidated Tape Association (``CTA'') Plan and Consolidated Quotation (``CQ... Plan, pursuant to which markets collect and disseminate bid/ask quotation information for listed...
16. Photocopy of Sheet 4 of Building Plan R41A, (USDA, ...
16. Photocopy of Sheet 4 of Building Plan R4-1A, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) SIDE ELEVATION AND DINING ALCOVE PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
9. Photocopy of Sheet 1 of Building Plan R451, (USDA, ...
9. Photocopy of Sheet 1 of Building Plan R4-51, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) Front, Rear, and Side Elevations and Floor Plan. - Buffalo Guard Station, Office, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
4. Photocopy of Sheet 1 of Building Plan R421, (USDA, ...
4. Photocopy of Sheet 1 of Building Plan R4-21, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings') FRONT AND SIDE ELEVATIONS, FLOOR AND FOUNDATION PLANS. - Buffalo Guard Station, Garage, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
DOT National Transportation Integrated Search
1987-03-01
Court monitoring is a planned approach to studying the handling of DWI offenders, from arrest through sentencing, either through actually observing court hearings or by reviewing case outcomes in court files. The booklet is designed to help groups in...
7 CFR 4274.344 - Filing and processing applications for loans.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., business representatives, or bankers, who reside in the service area and are not employees of the... with a strategic plan, particularly a plan prepared as part of a request for an Empowerment Zone...
7 CFR 4274.344 - Filing and processing applications for loans.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., business representatives, or bankers, who reside in the service area and are not employees of the... with a strategic plan, particularly a plan prepared as part of a request for an Empowerment Zone...
7 CFR 4274.344 - Filing and processing applications for loans.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., business representatives, or bankers, who reside in the service area and are not employees of the... with a strategic plan, particularly a plan prepared as part of a request for an Empowerment Zone...
42 CFR 430.38 - Judicial review.
Code of Federal Regulations, 2010 CFR
2010-10-01
... final determination on approvability of plan material (§ 430.18) or compliance with Federal requirements (§ 430.35) has a right to judicial review. (b) Petition for review. (1) The State must file a petition... petition with the Administrator and the Administrator will file in the court the record of the proceedings...
18. Photocopy of architectural drawing, September 1942 (original on file ...
18. Photocopy of architectural drawing, September 1942 (original on file at U.S. Army Intelligence Security Command, Fort Belvoir, Virginia). OPERATIONS BUILDING 'A', ARLINGTON HALL STATION. OFFICE BUILDING -- FOUNDATION PLAN -- HEATING. DRAWING M-24-161-24. - Arlington Hall Station, Building No. 401, 4000 Arlington Boulevard, Arlington, Arlington County, VA
29 CFR 70.54 - Employee Benefits Security Administration.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 1 2014-07-01 2013-07-01 true Employee Benefits Security Administration. 70.54 Section 70... Records and Filings § 70.54 Employee Benefits Security Administration. (a) The annual financial reports (Form 5500) and attachments/schedules as filed by employee benefit plans under the Employee Retirement...
40 CFR 300.815 - Administrative record file for a remedial action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.815... investigation phase. At such time, the lead agency shall publish in a major local newspaper of general circulation a notice of the availability of the administrative record file. (b) The lead agency shall provide...
18. Photocopy of drawing (22 x 34 inch diazo located ...
18. Photocopy of drawing (22 x 34 inch diazo located in the recreation files, Mt. Baker-Snoqualmie N. F.). G. STAVI, 1970. 1ST & 2ND FLOOR PLANS, ALTERATIONS TO CASCADE FILED STATION, GLACIER, WASHINGTON. - Austin Pass Warming Hut, Washington Highway 542, Glacier, Whatcom County, WA
75 FR 69142 - Postal Rate and Classification Changes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... with notice that the Postal Service has filed with the Commission notice of its intention of planned... changes have an anticipated effective date of January 2, 2011. The Postal Service's filing triggers a review process, which includes an opportunity for the public to comment. This document addresses the...
76 FR 55288 - Capital Plans; Proposed Agency Information Collection Activities: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... and revenues. This is organized similar to, but not identical to, the mandatory Consolidated Financial... statements and approved collection of information instruments are placed into OMB's public docket files. The... statement, and other documentation will be placed into OMB's public docket files, once approved. These...
29 CFR 70.54 - Employee Benefits Security Administration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Employee Benefits Security Administration. 70.54 Section 70... Records and Filings § 70.54 Employee Benefits Security Administration. (a) The annual financial reports (Form 5500) and attachments/schedules as filed by employee benefit plans under the Employee Retirement...
52. Photocopy of scale drawing (from Station 'L' office files, ...
52. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 1930 PLAN OF THE TURBINE ROOM BUILDING L1 SHOWING THE ARRANGEMENT OF TURBINE UNITS 1-4 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
Planning the data transition of a VLDB: a case study
NASA Astrophysics Data System (ADS)
Finken, Shirley J.
1997-02-01
This paper describes the technical and programmatic plans for moving and checking certain data from the IDentification Automated Services (IDAS) system to the new Interstate Identification Index/Federal Bureau of Investigation (III/FBI) Segment database--one of the three components of the Integrated Automated Fingerprint Identification System (IAFIS) being developed by the Federal Bureau of Investigation, Criminal Justice Information Services Division. Transitioning IDAS to III/FBI includes putting the data into an entirely new target database structure (i.e. from IBM VSAM files to ORACLE7 RDBMS tables). Only four IDAS files were transitioned (CCN, CCR, CCA, and CRS), but their total estimated size is at 500 Gb of data. Transitioning of this Very Large Database is planned as two processes.
NASA Astrophysics Data System (ADS)
Drosos, Vasileios C.; Liampas, Sarantis-Aggelos G.; Doukas, Aristotelis-Kosmas G.
2014-08-01
In our time, the Geographic Information Systems (GIS) have become important tools, not only in the geosciences and environmental sciences, as well as virtually for all researches that require monitoring, planning or land management. The purpose of this paper was to develop a planning tool and decision making tool using AutoCAD Map software, ArcGIS and Google Earth with emphasis on the investigation of the suitability of forest roads' mapping and the range of its implementation in Greece in prefecture level. Integrating spatial information into a database makes data available throughout the organization; improving quality, productivity, and data management. Also working in such an environment, you can: Access and edit information, integrate and analyze data and communicate effectively. To select desirable information such as forest road network in a very early stage in the planning of silviculture operations, for example before the planning of the harvest is carried out. The software programs that were used were AutoCAD Map for the export in shape files for the GPS data, and ArcGIS in shape files (ArcGlobe), while Google Earth with KML files (Keyhole Markup Language) in order to better visualize and evaluate existing conditions, design in a real-world context and exchange information with government agencies, utilities, and contractors in both CAD and GIS data formats. The automation of the updating procedure and transfer of any files between agencies-departments is one of the main tasks of the integrated GIS-tool among the others should be addressed.
Analysis of the Impact of Data Normalization on Cyber Event Correlation Query Performance
2012-03-01
2003). Organizations use it in planning, target marketing , decision-making, data analysis, and customer services (Shin, 2003). Organizations that...Following this IP address is a router message sequence number. This is a globally unique number for each router terminal and can range from...Appendix G, invokes the PERL parser for the log files from a particular USAF base, and invokes the CTL file that loads the resultant CSV file into the
NASA Technical Reports Server (NTRS)
Sheth, Kapil S.; Gutierrez-Nolasco, Sebastian
2010-01-01
This paper presents an analysis of factors that impact user flight schedules during air traffic congestion. In pre-departure flight planning, users file one route per flight, which often leads to increased delays, inefficient airspace utilization, and exclusion of user flight preferences. In this paper, first the idea of filing alternate routes and providing priorities on each of those routes is introduced. Then, the impact of varying planning interval and system imposed departure delay increment is discussed. The metrics of total delay and equity are used for analyzing the impact of these factors on increased traffic and on different users. The results are shown for four cases, with and without the optional routes and priority assignments. Results demonstrate that adding priorities to optional routes further improves system performance compared to filing one route per flight and using first-come first-served scheme. It was also observed that a two-hour planning interval with a five-minute system imposed departure delay increment results in highest delay reduction. The trend holds for a scenario with increased traffic.
Effect of reciprocating file motion on microcrack formation in root canals: an SEM study.
Ashwinkumar, V; Krithikadatta, J; Surendran, S; Velmurugan, N
2014-07-01
To compare dentinal microcrack formation whilst using Ni-Ti hand K-files, ProTaper hand and rotary files and the WaveOne reciprocating file. One hundred and fifty mandibular first molars were selected. Thirty teeth were left unprepared and served as controls, and the remaining 120 teeth were divided into four groups. Ni-Ti hand K-files, ProTaper hand files, ProTaper rotary files and WaveOne Primary reciprocating files were used to prepare the mesial canals. Roots were then sectioned 3, 6 and 9 mm from the apex, and the cut surface was observed under scanning electron microscope (SEM) and checked for the presence of dentinal microcracks. The control and Ni-Ti hand K-files groups were not associated with microcracks. In roots prepared with ProTaper hand files, ProTaper rotary files and WaveOne Primary reciprocating files, dentinal microcracks were present. There was a significant difference between control/Ni-Ti hand K-files group and ProTaper hand files/ProTaper rotary files/WaveOne Primary reciprocating file group (P < 0.001) with ProTaper rotary files producing the most microcracks. No significant difference was observed between teeth prepared with ProTaper hand files and WaveOne Primary reciprocating files. ProTaper rotary files were associated with significantly more microcracks than ProTaper hand files and WaveOne Primary reciprocating files. Ni-Ti hand K-files did not produce microcracks at any levels inside the root canals. © 2013 International Endodontic Journal. Published by John Wiley & Sons Ltd.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...
ERIC Educational Resources Information Center
Venn, Martha L.; McCollum, Jeanette
2002-01-01
An investigation into the long- and short-term planning practices of 21 Head Start teachers found the calendar, classroom environment, schedule, and classroom activities appeared to be the primary foci of the teachers' planning decisions. Teachers primarily used personal files, curriculum books, and other teaching personnel as planning resources.…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... subscribers pay for Network B last sale information under the CTA Plan and for Network B quotation information under the CQ Plan into one monthly fee of $24.00 per device for both last sale information and quotation... both Plans was in 1995. The CTA Plan, pursuant to which markets collect and disseminate last sale price...
Slow Controls Using the Axiom M5235BCC
NASA Astrophysics Data System (ADS)
Hague, Tyler
2008-10-01
The Forward Vertex Detector group at PHENIX plans to adopt the Axiom M5235 Business Card Controller for use as slow controls. It is also being evaluated for slow controls on FermiLab e906. This controller features the Freescale MCF5235 microprocessor. It also has three parallel buses, these being the MCU port, BUS port, and enhanced Time Processing Unit (eTPU) port. The BUS port uses a chip select module with three external chip selects to communicate with peripherals. This will be used to communicate with and configure Field Programmable Gate Arrays (FPGAs). The controller also has an Ethernet port which can use several different protocols such as TCP and UDP. This will be used to transfer files with computers on a network. The M5235 Business Card Controller will be placed in a VME crate along with VME card and a Spartan-3 FPGA.
National Voice Response System (VRS) Implementation Plan Alternatives Study
DOT National Transportation Integrated Search
1979-07-01
This study examines the alternatives available to implement a national Voice Response System (VRS) for automated preflight weather briefings and flight plan filing. Four major hardware configurations are discussed. A computerized analysis model was d...
50. OUTLET WORKS: OUTLET STRUCTURE PLAN AND SECTIONS. Sheet ...
50. OUTLET WORKS: OUTLET STRUCTURE - PLAN AND SECTIONS. Sheet C-1, September, 1939. File no. SA 343/50. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
43. OUTLET WORKS: SERVICE BRIDGE PLAN AND ELEVATION. Sheet ...
43. OUTLET WORKS: SERVICE BRIDGE - PLAN AND ELEVATION. Sheet 37, August 20, 1938. File no. SA 121/76. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
31. OUTLET WORKS: INTAKE PLAN AND SECTIONS. Sheet 21, ...
31. OUTLET WORKS: INTAKE - PLAN AND SECTIONS. Sheet 21, August 20, 1938. File no. SA 121/60. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Computer assisted audit techniques for UNIX (UNIX-CAATS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polk, W.T.
1991-12-31
Federal and DOE regulations impose specific requirements for internal controls of computer systems. These controls include adequate separation of duties and sufficient controls for access of system and data. The DOE Inspector General`s Office has the responsibility to examine internal controls, as well as efficient use of computer system resources. As a result, DOE supported NIST development of computer assisted audit techniques to examine BSD UNIX computers (UNIX-CAATS). These systems were selected due to the increasing number of UNIX workstations in use within DOE. This paper describes the design and development of these techniques, as well as the results ofmore » testing at NIST and the first audit at a DOE site. UNIX-CAATS consists of tools which examine security of passwords, file systems, and network access. In addition, a tool was developed to examine efficiency of disk utilization. Test results at NIST indicated inadequate password management, as well as weak network resource controls. File system security was considered adequate. Audit results at a DOE site indicated weak password management and inefficient disk utilization. During the audit, we also found improvements to UNIX-CAATS were needed when applied to large systems. NIST plans to enhance the techniques developed for DOE/IG in future work. This future work would leverage currently available tools, along with needed enhancements. These enhancements would enable DOE/IG to audit large systems, such as supercomputers.« less
Computer assisted audit techniques for UNIX (UNIX-CAATS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polk, W.T.
1991-01-01
Federal and DOE regulations impose specific requirements for internal controls of computer systems. These controls include adequate separation of duties and sufficient controls for access of system and data. The DOE Inspector General's Office has the responsibility to examine internal controls, as well as efficient use of computer system resources. As a result, DOE supported NIST development of computer assisted audit techniques to examine BSD UNIX computers (UNIX-CAATS). These systems were selected due to the increasing number of UNIX workstations in use within DOE. This paper describes the design and development of these techniques, as well as the results ofmore » testing at NIST and the first audit at a DOE site. UNIX-CAATS consists of tools which examine security of passwords, file systems, and network access. In addition, a tool was developed to examine efficiency of disk utilization. Test results at NIST indicated inadequate password management, as well as weak network resource controls. File system security was considered adequate. Audit results at a DOE site indicated weak password management and inefficient disk utilization. During the audit, we also found improvements to UNIX-CAATS were needed when applied to large systems. NIST plans to enhance the techniques developed for DOE/IG in future work. This future work would leverage currently available tools, along with needed enhancements. These enhancements would enable DOE/IG to audit large systems, such as supercomputers.« less
Adaptive remote sensing technology for feature recognition and tracking
NASA Technical Reports Server (NTRS)
Wilson, R. G.; Sivertson, W. E., Jr.; Bullock, G. F.
1979-01-01
A technology development plan designed to reduce the data load and data-management problems associated with global study and monitoring missions is described with a heavy emphasis placed on developing mission capabilities to eliminate the collection of unnecessary data. Improved data selectivity can be achieved through sensor automation correlated with the real-time needs of data users. The first phase of the plan includes the Feature Identification and Location Experiment (FILE) which is scheduled for the 1980 Shuttle flight. The FILE experiment is described with attention given to technology needs, development plan, feature recognition and classification, and cloud-snow detection/discrimination. Pointing, tracking and navigation received particular consideration, and it is concluded that this technology plan is viewed as an alternative to approaches to real-time acquisition that are based on extensive onboard format and inventory processing and reliance upon global-satellite-system navigation data.
78 FR 2694 - Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting The ACRS Subcommittee on Planning and Procedures..., Advisory Committee on Reactor Safeguards. [FR Doc. 2013-00543 Filed 1-11-13; 8:45 am] BILLING CODE 7590-01...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
.... Although the Limit Up-Limit Down Plan will be operational during the same time period as the proposed... implementation of the Plan is operational will help to protect against unanticipated consequences. To that end... in connection with the upcoming operation of the Plan to Address Extraordinary Market Volatility...
1. Photocopy of landscape plan of Hornet Ranger Station, approved ...
1. Photocopy of landscape plan of Hornet Ranger Station, approved 8-11-1936. Original on file with the Payette National Forest, Supervisor's Office, McCall, Idaho. Photograph is 8'x 10', enlarged from a 4'x 5' negative. LANDSCAPE PLANTING PLAN. - Hornet Ranger Station, Forest Service Road No. 50002, Council, Adams County, ID
3. Photocopy of improvement plan of Hornet Ranger Station, approved ...
3. Photocopy of improvement plan of Hornet Ranger Station, approved January 1941. Original on file with the Payette National Forest, Supervisor's Office, McCall, Idaho. Photograph is 8'x 10', enlarged from a 4'x 5' negative. IMPROVEMENT PLAN. - Hornet Ranger Station, Forest Service Road No. 50002, Council, Adams County, ID
18 CFR 141.300 - FERC Form No. 715, Annual Transmission Planning and Evaluation Report.
Code of Federal Regulations, 2010 CFR
2010-04-01
... FERC Form No. 715, Annual Transmission Planning and Evaluation Report. (a) Who must file. Any... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC Form No. 715, Annual Transmission Planning and Evaluation Report. 141.300 Section 141.300 Conservation of Power and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-08
... Plan (``Amendments'') would amend the Plans to provide that the Participants pay the Network B Administrator a fixed annual fee in exchange for its performance of Network B administrator functions under the... Amendments Network Administrator Fees under the Plans. Section XII (``Financial Matters'') of the CTA and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Data entry. 245.27 Section 245.27 National... Under ESCAT § 245.27 Data entry. Aircraft will file IFR or VFR flight plans, assigned a discrete... entered in the remarks section of the flight plan. The EATPL number will be passed with flight plan data...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Data entry. 245.27 Section 245.27 National... Under ESCAT § 245.27 Data entry. Aircraft will file IFR or VFR flight plans, assigned a discrete... entered in the remarks section of the flight plan. The EATPL number will be passed with flight plan data...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Data entry. 245.27 Section 245.27 National... Under ESCAT § 245.27 Data entry. Aircraft will file IFR or VFR flight plans, assigned a discrete... entered in the remarks section of the flight plan. The EATPL number will be passed with flight plan data...
Analysis of Atlanta Compromise School Desegregation Plan.
ERIC Educational Resources Information Center
Research Atlanta, Inc., GA.
On February 22, 1973, attorneys for the National Association for the Advancement of Colored People and the Atlanta Board of Education filed a compromise desegregation plan with the U.S. District Court for the Northern District of Georgia. If the Court approves, this compromise will constitute the final desegregation plan for the Atlanta Public…
Establishing an Environmental Scanning System to Augment College and University Planning.
ERIC Educational Resources Information Center
Morrison, James L.
A plan to establish an environmental scanning and forecasting system for colleges and universities is discussed as a way to maximize long-range planning. After proposing a program structure, attention is directed to methods of gaining organizational acceptance, developing a comprehensive taxonomy with an electronic filing system, identifying and…
34 CFR 361.10 - Submission, approval, and disapproval of the State plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false Submission, approval, and disapproval of the State plan...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE VOCATIONAL... decision to disapprove the State plan by filing a petition for review with the United States Court of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Data entry. 245.27 Section 245.27 National... Under ESCAT § 245.27 Data entry. Aircraft will file IFR or VFR flight plans, assigned a discrete... entered in the remarks section of the flight plan. The EATPL number will be passed with flight plan data...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Data entry. 245.27 Section 245.27 National... Under ESCAT § 245.27 Data entry. Aircraft will file IFR or VFR flight plans, assigned a discrete... entered in the remarks section of the flight plan. The EATPL number will be passed with flight plan data...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... proposed rule to implement a regulatory amendment (Regulatory Amendment 12) to the Fishery Management Plan... can also attach additional files (up to 10MB) in Microsoft Word, Excel, WordPerfect, or Adobe PDF file... benefit to the nation, particularly with respect to providing food production and recreational...
75 FR 14386 - Interpretation of Transmission Planning Reliability Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... created electronically using word processing software should be filed in native applications or print-to.... FERC, 564 F.3d 1342 (DC Cir. 2009). \\6\\ Mandatory Reliability Standards for the Bulk-Power System... print-to-PDF format and not in a scanned format. Commenters filing electronically do not need to make a...
O-Plan2 VS Sipe-2 - A General Comparison
1994-07-01
on them that are satisfied by the planner. SIPE-2 has been extended to interface with General Electric’s Tachyon system for temporal reasoning...Temporal constraints in SIPE-2 are written to a file that is read by Tachyon . Tachyon processes these constraints and writes a file of narrowed time
20. Photocopy of architectural drawing, September 1942 (original on file ...
20. Photocopy of architectural drawing, September 1942 (original on file at U.S. Army Intelligence Security Command, Fort Belvoir, Virginia). OPERATIONS BUILDING 'A', ARLINGTON HALL STATION. OFFICE BUILDING -- SECOND FLOOR PLAN -- HEATING. DRAWING M-24-161-26. - Arlington Hall Station, Building No. 401, 4000 Arlington Boulevard, Arlington, Arlington County, VA
19. Photocopy of architectural drawing, September 1942 (original on file ...
19. Photocopy of architectural drawing, September 1942 (original on file at U.S. Army Intelligence Security Command, Fort Belvoir, Virginia). OPERATIONS BUILDING 'A', ARLINGTON HALL STATION. OFFICE BUILDING -- FIRST FLOOR PLAN -- HEATING. DRAWING M-24-161-25. - Arlington Hall Station, Building No. 401, 4000 Arlington Boulevard, Arlington, Arlington County, VA
46. Photocopy of scale drawing (from Station 'L' office files, ...
46. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 1937 PIPING ARRANGEMENT OF BOILER #16 BUILDING LB SHOWN IN ELEVATION (LEFT), PLAN (TOP RIGHT) AND ELEVATION (BOTTOM RIGHT) - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
41. Photocopy of scale drawing (from Station 'L' office files, ...
41. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 6/28/1928 PLAN (TOP) AND ELEVATION (BOTTOM) OF BOILER #13 BUILDING L4, GENERAL LAYOUT OF THE STEAM PIPING SYSTEM - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
30. Photocopy of scale drawing (from Station 'L' office files, ...
30. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, c.1960 PLAN OF THE L.P. BOILER ROOM BUILDING L2 WHICH HOUSED THE ORIGINAL EIGHT BOILERS OF STATION 'L' - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
42. Photocopy of scale drawing (from Station 'L' office files, ...
42. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 3/1/1927 SECTION (LEFT), ELEVATION (TOP RIGHT) AND PLAN (BOTTOM RIGHT) OF BOILER #13 BUILDING L4 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
The Area Resource File: ARF. A Manpower Planning and Research Tool.
ERIC Educational Resources Information Center
Applied Management Sciences, Inc., Silver Spring, MD.
This publication describes the Area Resource File (ARF), a computer-based, county-specific health information system with broad analytical capabilities which utilizes manpower and manpower-related data that are available on a compatible basis for all counties in the United States, and which was developed to summarize statistics from many disparate…
Economics of Computing: The Case of Centralized Network File Servers.
ERIC Educational Resources Information Center
Solomon, Martin B.
1994-01-01
Discusses computer networking and the cost effectiveness of decentralization, including local area networks. A planned experiment with a centralized approach to the operation and management of file servers at the University of South Carolina is described that hopes to realize cost savings and the avoidance of staffing problems. (Contains four…
Predictors of Legal Intervention in Child Maltreatment Cases.
ERIC Educational Resources Information Center
Tjaden, Patricia G.; Thoennes, Nancy
1992-01-01
Analysis of records of dependency and criminal filings in 833 substantiated intrafamilial child abuse and neglect cases in 3 U.S. cities indicated that legal intervention was rare, with dependency filings and prosecutions in just 21% and 4% of the sample, respectively, although treatment plans and out-of-home placements occurred more frequently.…
25. Photocopy of drawing, August 30, 1951 (original in files ...
25. Photocopy of drawing, August 30, 1951 (original in files of United States Military Academy Architectural Archive, West Point, New York) CONVERSION OF ICE HOUSE TO WAREHOUSE, FRONT ELEVATION, SOUTH ELEVATION, PLAN, TRANSVERSE SECTION - U.S. Military Academy, Ice House, Mills Road at Howze Place, West Point, Orange County, NY
Code of Federal Regulations, 2013 CFR
2013-07-01
...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...
Code of Federal Regulations, 2012 CFR
2012-07-01
...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...
Code of Federal Regulations, 2014 CFR
2014-07-01
...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...
Code of Federal Regulations, 2011 CFR
2011-07-01
...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...
Code of Federal Regulations, 2010 CFR
2010-07-01
...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...
40 CFR 300.820 - Administrative record file for a removal action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.820 Administrative record file for a removal action. (a) If, based on the site evaluation, the lead agency determines... public comment. At such time, the lead agency shall publish in a major local newspaper of general...
NASA Technical Reports Server (NTRS)
Zamora, M. A.
1976-01-01
The contents of the Flight Data File which constitute the data required by and the data generated by the Mission Planning Processor are presented for the construction of the timeline and the determination of the consumables requirements of a given mission.
43 CFR 3140.6 - Use of additional lands.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities in a Special Tar Sand Area that are needed to support any operations necessary for the recovery of... be filed at the time a plan of operations is filed. (b) A lease for the use of additional lands shall... include, but are not limited to, reservoirs, pipelines, electrical generation systems, transmission lines...
Getting the Most Out of Progress Files and Personal Development Planning
ERIC Educational Resources Information Center
Croot, David; Gedye, Sharon
2006-01-01
Progress Files have been set by the government as a specific element of all higher education provision in England and "should consist of two elements: a transcript recording student achievement which should follow a common format devised by institutions collectively through their representative bodies; and a means by which students can …
The Implementation of Progress Files in Higher Education: Reflection as National Policy
ERIC Educational Resources Information Center
Clegg, Sue; Bradley, Sally
2006-01-01
Progress files, involving personal development planning (PDP), are becoming a feature of many higher education systems internationally. In the UK they will become mandatory for all undergraduate students from 2005. This presents a major implementation challenge, because while reflection has been a cornerstone of practice in some areas of higher…
Lidar - ESRL WindCube 200s, Wasco Airport - Processed Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choukulkar, Aditya
The available "Readme" file introduces the basics of the Doppler lidar data and offers a detailed description of the variables present in the data files. For those with any further questions about the data and its interpretation, contact either Alan Brewer () or Aditya Choukulkar (). It is highly recommended to discuss any planned use of the data with National Oceanic and Atmospheric Administration-Chemical Sciences Division (NOAA-CSD) scientists. For more information, refer to the Readme file: "noaa-esrl-wascolidar-readme.docx."
Lidar - ESRL WindCube 200s, Wasco Airport - Raw Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choukulkar, Aditya
The available "Readme" file introduces the basics of the Doppler lidar data and offers a detailed description of the variables present in the data files. For those with any further questions about the data and its interpretation, contact either Alan Brewer () or Aditya Choukulkar (). It is highly recommended to discuss any planned use of the data with National Oceanic and Atmospheric Administration-Chemical Sciences Division (NOAA-CSD) scientists. For more information, refer to the Readme file: "noaa-esrl-wascolidar-readme.docx."
Lidar - ESRL WindCube 200s, Wasco Airport - Reviewed Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choukulkar, Aditya
The available "Readme" file introduces the basics of the Doppler lidar data and offers a detailed description of the variables present in the data files. For those with any further questions about the data and its interpretation, contact either Alan Brewer () or Aditya Choukulkar (). It is highly recommended to discuss any planned use of the data with National Oceanic and Atmospheric Administration-Chemical Sciences Division (NOAA-CSD) scientists. For more information, refer to the Readme file: "noaa-esrl-wascolidar-readme-1.pdf."
Lidar - ESRL WindCube 200s, Arlington Airport - Reviewed Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choukulkar, Aditya
The available "readme" file introduces the basics of the Doppler lidar data and offers a detailed description of the variables present in the data files. For those with any further questions about the data and its interpretation, contact either Alan Brewer () or Aditya Choukulkar (). It is highly recommended to discuss any planned use of the data with National Oceanic and Atmospheric Administration-Chemical Sciences Division (NOAA-CSD) scientists. For more information, refer to the Readme file: "noaa-esrl-arlingtonlidar-readme-1.pdf."
Transparency in Distributed File Systems
1989-01-01
ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK Computer Science Department AREA & WORK UNIT NUMBERS 734 Comouter Studies Bldc . University of...sistency control , file and director) placement, and file and directory migration in a way that pro- 3 vides full network transparency. This transparency...areas of naming, replication, con- sistency control , file and directory placement, and file and directory migration in a way that pro- 3 vides full
Fumigant Management Plan Templates - Phase 2 Files Listed by Chemical
FMP templates are in PDF and Word formats for each type of soil fumigant pesticide, with samples of filled out plans. Types are by active ingredient chemical: Chloropicrin, dazomet, dimethyl disulfide, metam sodium/potassium, and methyl bromide.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 246.401 General. The requirement for a quality assurance surveillance plan shall be addressed and documented in the contract file... services, the contracting officer should prepare a quality assurance surveillance plan to facilitate...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Organization Plan Governing the Collection, Consolidation and Dissemination of Quotation and Transaction...., EDGA Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self- [[Page 5228
25. PLAN OF SPILLWAY SHOWING INDEX TO MONOLITHS. Sheet S18, ...
25. PLAN OF SPILLWAY SHOWING INDEX TO MONOLITHS. Sheet S-18, July, 1939. File no. SA 342/15. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
27. SPILLWAY CHANNEL: PLAN AND SECTIONS OF CRIB CUTOFF. Sheet ...
27. SPILLWAY CHANNEL: PLAN AND SECTIONS OF CRIB CUTOFF. Sheet S-27, May, 1939. File no. SA 342/36. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
29. Photocopy of 1921 architectural drawing titled: BUILDING 59, EXTENSION ...
29. Photocopy of 1921 architectural drawing titled: BUILDING 59, EXTENSION NORTH. ROOF PLAN, NORTH ELEVATION AND LOCATION PLAN. Drawing No. 6259, File No. 651-23. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
Code of Federal Regulations, 2010 CFR
2010-04-01
... service, such as development of an individual employment plan with a case manager or individual counseling and career planning, before the individual may receive training services. (b) The case file must...
This photocopy of an engineering drawing shows the floor plan ...
This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA
Jones, William R.; Garber, Adrienne
2013-01-01
The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the classification of high-resolution, color-infrared aerial photography at the U.S. Geological Survey’s National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change.
Hilfer, Paul B; Bergeron, Brian E; Mayerchak, Michael J; Roberts, Howard W; Jeansonne, Billie G
2011-01-01
Novel nickel-titanium rotary files with proprietary manufacturing techniques have recently been marketed. The purpose of this study was to assess multiple autoclave cycle effects on cyclic fatigue of GT Series X files (Dentsply Tulsa Dental Specialties, Tulsa, OK) and Twisted Files (SybronEndo, Orange, CA) METHODS: A jig using a 5-mm radius curve with 90° of maximum file flexure was used to induce cyclic fatigue failure. Files (n = 10) representing each experimental group (GT Series X 20/.04 and 20/.06; Twisted Files 25/.04 and 25/.06) were first tested to establish baseline mean cycles to failure (MCF). Experimental groups (n = 20) were then cycled to 25% of the established baseline MCF and then autoclaved. Additional autoclaving was accomplished at 50% and 75% of MCF followed by continual testing until failure. Control groups (n = 20) underwent the same procedures except autoclaving was not accomplished. The GT Series X (20/.04 and 20/.06) files showed no significant difference (p = 0.918/p = 0.096) in MCF for experimental versus control files. Twisted Files (25/.04) showed no significant difference (p = 0.432) in MCF between experimental and control groups. However, the Twisted Files (25/.06) experimental group showed a significantly lower (p = 0.0175) MCF compared with the controls. Under the conditions of this evaluation, autoclave sterilization significantly decreased cyclic fatigue resistance of one of the four file groups tested. Repeated autoclaving significantly reduced the MCF of 25/.06 Twisted Files; however, 25/.04 Twisted Files and both GT Series X files tested were not significantly affected by the same conditions. Published by Elsevier Inc.
SU-F-T-469: A Clinically Observed Discrepancy Between Image-Based and Log- Based MLC Position
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neal, B; Ahmed, M; Siebers, J
2016-06-15
Purpose: To present a clinical case which challenges the base assumption of log-file based QA, by showing that the actual position of a MLC leaf can suddenly deviate from its programmed and logged position by >1 mm as observed with real-time imaging. Methods: An EPID-based exit-fluence dosimetry system designed to prevent gross delivery errors was used in cine mode to capture portal images during treatment. Visual monitoring identified an anomalous MLC leaf pair gap not otherwise detected by the automatic position verification. The position of the erred leaf was measured on EPID images and log files were analyzed for themore » treatment in question, the prior day’s treatment, and for daily MLC test patterns acquired on those treatment days. Additional standard test patterns were used to quantify the leaf position. Results: Whereas the log file reported no difference between planned and recorded positions, image-based measurements showed the leaf to be 1.3±0.1 mm medial from the planned position. This offset was confirmed with the test pattern irradiations. Conclusion: It has been clinically observed that log-file derived leaf positions can differ from their actual positions by >1 mm, and therefore cannot be considered to be the actual leaf positions. This cautions the use of log-based methods for MLC or patient quality assurance without independent confirmation of log integrity. Frequent verification of MLC positions through independent means is a necessary precondition to trusting log file records. Intra-treatment EPID imaging provides a method to capture departures from MLC planned positions. Work was supported in part by Varian Medical Systems.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
.... The Regional Administrator shall integrate the NEPA process with other planning at the earliest... guidelines available upon request. (ii) The Regional Administrator shall provide such guidance on a project... agency approval, or notification that an application will be filed, the Regional Administrator shall...
Code of Federal Regulations, 2014 CFR
2014-10-01
.... The Regional Administrator shall integrate the NEPA process with other planning at the earliest... guidelines available upon request. (ii) The Regional Administrator shall provide such guidance on a project... agency approval, or notification that an application will be filed, the Regional Administrator shall...
29. OUTLET WORKS: GENERAL PLAN AND SECTIONS. Sheet A1, date ...
29. OUTLET WORKS: GENERAL PLAN AND SECTIONS. Sheet A-1, date stamped January, 1939. File no. SA 949/80. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
17. Historic plan of Building 100. June 29, 1955. NASA ...
17. Historic plan of Building 100. June 29, 1955. NASA GRC drawing number CE-101441. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
9. Historic plan drawing of Building 205, July 1978. NASA ...
9. Historic plan drawing of Building 205, July 1978. NASA GRC Drawing no. CC-18263. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 205, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
48 CFR 237.172 - Service Contracts Surveillance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Surveillance. 237.172 Section 237.172 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...-General 237.172 Service Contracts Surveillance. Ensure that quality assurance surveillance plans are....) Retain quality assurance surveillance plans in the official contract file. See https://sam.dau.mil, Step...
48 CFR 237.172 - Service Contracts Surveillance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Surveillance. 237.172 Section 237.172 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...-General 237.172 Service Contracts Surveillance. Ensure that quality assurance surveillance plans are....) Retain quality assurance surveillance plans in the official contract file. See https://sam.dau.mil, Step...
48 CFR 237.172 - Service Contracts Surveillance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Surveillance. 237.172 Section 237.172 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...-General 237.172 Service Contracts Surveillance. Ensure that quality assurance surveillance plans are....) Retain quality assurance surveillance plans in the official contract file. See https://sam.dau.mil, Step...
48 CFR 237.172 - Service Contracts Surveillance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Surveillance. 237.172 Section 237.172 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...-General 237.172 Service Contracts Surveillance. Ensure that quality assurance surveillance plans are....) Retain quality assurance surveillance plans in the official contract file. See https://sam.dau.mil, Step...
48 CFR 237.172 - Service Contracts Surveillance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Surveillance. 237.172 Section 237.172 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...-General 237.172 Service Contracts Surveillance. Ensure that quality assurance surveillance plans are....) Retain quality assurance surveillance plans in the official contract file. See https://sam.dau.mil, Step...
Analysis of the access patterns at GSFC distributed active archive center
NASA Technical Reports Server (NTRS)
Johnson, Theodore; Bedet, Jean-Jacques
1996-01-01
The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational for more than two years. Its mission is to support existing and pre Earth Observing System (EOS) Earth science datasets, facilitate the scientific research, and test Earth Observing System Data and Information System (EOSDIS) concepts. Over 550,000 files and documents have been archived, and more than six Terabytes have been distributed to the scientific community. Information about user request and file access patterns, and their impact on system loading, is needed to optimize current operations and to plan for future archives. To facilitate the management of daily activities, the GSFC DAAC has developed a data base system to track correspondence, requests, ingestion and distribution. In addition, several log files which record transactions on Unitree are maintained and periodically examined. This study identifies some of the users' requests and file access patterns at the GSFC DAAC during 1995. The analysis is limited to the subset of orders for which the data files are under the control of the Hierarchical Storage Management (HSM) Unitree. The results show that most of the data volume ordered was for two data products. The volume was also mostly made up of level 3 and 4 data and most of the volume was distributed on 8 mm and 4 mm tapes. In addition, most of the volume ordered was for deliveries in North America although there was a significant world-wide use. There was a wide range of request sizes in terms of volume and number of files ordered. On an average 78.6 files were ordered per request. Using the data managed by Unitree, several caching algorithms have been evaluated for both hit rate and the overhead ('cost') associated with the movement of data from near-line devices to disks. The algorithm called LRU/2 bin was found to be the best for this workload, but the STbin algorithm also worked well.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... at http://www.sec.gov and also on the Exchange's Internet Web site at http://nasdaqomxbx... Options Order Protection and Locked/Crossed Market Plan (``Decentralized Plan'').\\6\\ \\5\\ See Securities... mechanisms to remain fully compliant with the Decentralized Plan and BOX Rules and to no longer rely upon a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... FINRA to determine whether Rule 11892 is necessary once the Plan is operational and, if so, whether... in Connection With the Limit Up-Limit Down Plan February 1, 2013. Pursuant to Section 19(b)(1) of the... also proposes to adopt new supplementary material in connection with the upcoming operation of the Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... of investors and the public interest. Although the Limit Up-Limit Down Plan will be operational... pilot for at least through the phased implementation of the Plan is operational will help to protect... determine whether Rule 11890 is necessary once the Plan is operational and, if so, whether improvements can...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... of investors and the public interest. Although the Limit Up-Limit Down Plan will be operational... Pilot for at least through the phased implementation of the Plan is operational will help to protect... whether Rule 11.13 is necessary once the Plan is operational and, if so, whether improvements can be made...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
... Rule Change Relating to a Market Maker Incentive Plan for Foreign Currency Options January 5, 2012... an incentive plan for market makers in a number of foreign currency options (``FX Options'') traded... proposed rule change is to extend an incentive plan for market makers in options on the New Zealand dollar...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... Up-Limit Down Plan will be operational during the same time period as the proposed extended pilot... Plan is operational will help to protect against unanticipated consequences. To that end, the extension will allow the Exchange to determine whether Rule 11.19 is necessary once the Plan is operational and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... of investors and the public interest. Although the Limit Up-Limit Down Plan will be operational... pilot for at least through the phased implementation of the Plan is operational will help to protect... whether Rule 52.4 is necessary once the Plan is operational and, if so, whether improvements can be made...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... Rule Change Relating to a Market Maker Incentive Plan for Foreign Currency Options October 11, 2011... plan for market makers in a number of foreign currency options (``FX Options'') traded on the Exchange... change is to extend an incentive plan for market makers in options on the New Zealand dollar (``NZD...
43 CFR 3809.401 - Where do I file my plan of operations and what information must I include with it?
Code of Federal Regulations, 2011 CFR
2011-10-01
... would not result in unnecessary or undue degradation of public lands. (b) Your plan of operations must... BLM to determine that the plan of operations prevents unnecessary or undue degradation: (1) Operator... closure (including periods of seasonal closure) to prevent unnecessary or undue degradation. The interim...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Labor may provide a limited exemption for any employee welfare benefit plan with respect to certain annual reporting requirements. (b) Application. The administrator of an employee pension or welfare... administrator of an employee pension or welfare benefit plan described in § 2520.103-1(d) may file the...
29 CFR 4245.4 - Contents of notice of insolvency.
Code of Federal Regulations, 2011 CFR
2011-07-01
... without regard to the insolvency) for each insolvency year. (10) The estimated amount of the plan's... the PBGC and, if so, the date on which the notice was filed. (6) The plan year or years for which the..., during the insolvency year or years. However, if a copy of the plan document was submitted to the PBGC...
29 CFR 4245.4 - Contents of notice of insolvency.
Code of Federal Regulations, 2010 CFR
2010-07-01
... without regard to the insolvency) for each insolvency year. (10) The estimated amount of the plan's... the PBGC and, if so, the date on which the notice was filed. (6) The plan year or years for which the..., during the insolvency year or years. However, if a copy of the plan document was submitted to the PBGC...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... Volatility \\6\\ (the ``Limit Up-Limit Down Plan''). The Exchange believes the benefits to market participants... April 8, 2014, which is one year following commencement of operations of the Limit Up-Limit Down Plan... should continue while the industry gains further experience operating the Limit Up-Limit Down Plan. \\3...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... Pursuant to Rule 608 of Regulation NMS under the Act (the ``Limit Up-Limit Down Plan'' or the ``Plan'').\\7... Clearly Erroneous Rule should continue while the industry gains further experience operating the Limit Up-Limit Down Plan. \\5\\ Securities Exchange Act Release No. 62886 (September 10, 2010), 75 FR 56613...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
...\\ (the ``Limit Up-Limit Down Plan''). The Exchange believes the benefits to market participants from the..., which is one year following commencement of operations of the Limit Up-Limit Down Plan. The Exchange... the industry gains further experience operating the Limit Up-Limit Down Plan. \\3\\ Securities Exchange...
29 CFR 4281.32 - Notices of benefit reductions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the notice at participants' work sites or publishing the notice in a union newsletter or in a... and the three-digit Plan Number (PN) assigned by the plan sponsor to the plan, and, if different, the EIN or PN last filed with the PBGC. If no EIN or PN has been assigned, the notice shall so state. (4...
29 CFR 4281.32 - Notices of benefit reductions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the notice at participants' work sites or publishing the notice in a union newsletter or in a... and the three-digit Plan Number (PN) assigned by the plan sponsor to the plan, and, if different, the EIN or PN last filed with the PBGC. If no EIN or PN has been assigned, the notice shall so state. (4...
Code of Federal Regulations, 2013 CFR
2013-01-01
... that failure of the CIDI may occur under the baseline, adverse and severely adverse economic conditions...) Assessing the feasibility of the CIDI's plans, under baseline, adverse and severely adverse economic... conducted by the CIDI since the date of the most recently filed resolution plan to assess the viability of...
Code of Federal Regulations, 2014 CFR
2014-01-01
... that failure of the CIDI may occur under the baseline, adverse and severely adverse economic conditions...) Assessing the feasibility of the CIDI's plans, under baseline, adverse and severely adverse economic... conducted by the CIDI since the date of the most recently filed resolution plan to assess the viability of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
... publication of the Commission's order approving the proposed Plan in the Federal Register. D. Development and..., Illinois 60605 (5) EDGA Exchange, Inc., 545 Washington Boulevard, Sixth Floor, Jersey City, NJ 07310 (6) EDGX Exchange, Inc., 545 Washington Boulevard, Sixth Floor, Jersey City, NJ 07310 (7) Financial...
47 CFR 63.04 - Filing procedures for domestic transfer of control applications
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Filing procedures for domestic transfer of... Extensions and Supplements § 63.04 Filing procedures for domestic transfer of control applications (a) Domestic services only. A carrier seeking domestic section 214 authorization for transfer of control should...
Career Activity File: Counseling Tools for a Guidance Program, K-12.
ERIC Educational Resources Information Center
Oklahoma State Dept. of Career and Technology Education, Stillwater.
This career activity file provides career information resources and tools to support a guidance program. Section 1 is a school guidance program plan designed to assist school counselors in strengthening their current program or in designing a new one. The information can be used to assist schools in meeting the requirements of Standard VI,…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
...). The Limit Up-Limit Down Plan is designed to prevent executions from occurring outside of dynamic price... count for purposes of calculating whether a Market Maker is fulfilling its obligations for continuous... Organizations; BOX Options Exchange LLC; Notice of Filing of Proposed Rule Change To Clarify How the Exchange...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-17
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12665-003] New York Tidal... Tidal Energy Company. e. Name of Project: East River Tidal Energy Pilot Project. f. Location: In the.... Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations. h. Applicant Contact: Daniel Power...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... Organizations; BATS Y-Exchange, Inc.; Notice of Filing of Proposed Minor Rule Violation Plan September 16, 2010...) thereunder,\\2\\ notice is hereby given that on September 10, 2010, the BATS Y-Exchange, Inc. (``BATS Y..., including a hearing, or otherwise exhausted his administrative remedies. BATS Y-Exchange proposes to include...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Pre-filing procedures... applications. 157.21 Section 157.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...) A description of a Public Participation Plan which identifies specific tools and actions to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Pre-filing procedures... applications. 157.21 Section 157.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...) A description of a Public Participation Plan which identifies specific tools and actions to...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Pre-filing procedures... applications. 157.21 Section 157.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...) A description of a Public Participation Plan which identifies specific tools and actions to...
75 FR 57761 - North American Electric Reliability Corporation; Notice of Filing September 14, 2010.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
... request for approval of implementation plans for Generator Owners and Generator Operators of nuclear power..., 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at http://www.ferc.gov... Washington, DC. There is an ``eSubscription'' link on the Web site that enables subscribers to receive e-mail...
40. Photocopy of scale drawing (from Station 'L' office files, ...
40. Photocopy of scale drawing (from Station 'L' office files, Portland, Oregon) Portland General Electric in house drawing, 12/6/1927 ELEVATION (TOP), SECTION (BOTTOM LEFT) AND PLAN (BOTTOM RIGHT) OF THE STEAM PIPING LEADING TO BOILER #13 BUILDING L4 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR
Business Continuity Management Plan
2014-12-01
organization ( Shaw , 2004). Navy Supply Systems Command (NAVSUP) does not have a framework that can help develop a business continuity management (BCM...cites two case studies that demonstrate how an organization mitigated issues during catastrophic events that led to disruptions to their business ...www.uschamber.com/sites/default/files/legacy/ issues /defense/files/guideli nesbc.pdf Comprehensive Emergency Management Associates. (2006). Business continuity
Johnson, M A; Primack, P D; Loushine, R J; Craft, D W
1997-01-01
Ninety-two new endodontic files were randomly assigned to five groups with varying parameters of contamination, cleaning method, and sterilization (steam or chemical). Files were instrumented in bovine teeth to accumulate debris and a known contaminant, Bacillus stearothermophilus. Positive controls produced growth on both T-soy agar plates and in T-soy broth. Negative controls and experimental files (some with heavy debris) failed to produce growth. The results showed that there was no significant difference between contaminated files that were not cleaned before sterilization and contaminated files that were cleaned before sterilization. Bioburden present on endodontic files does not appear to affect the sterilization process.
12 CFR 563b.125 - Must my board of directors adopt a plan of conversion?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Must my board of directors adopt a plan of... board of directors adopt a plan of conversion? Prior to filing an application for conversion, your board of directors must adopt a plan of conversion that conforms to §§ 563b.320 through 563b.485 and 563b...
12. Historic plot plan and drawings index for rocket engine ...
12. Historic plot plan and drawings index for rocket engine test facility, June 28, 1956. NASA GRC drawing number CE-101810. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
8. Historic plan, section, and detail drawing of observation blockhouse. ...
8. Historic plan, section, and detail drawing of observation blockhouse. NASA GRC drawing no. CE-101540, June29, 1955 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, Observation Blockhouse, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
60. Historic plan of Building 202 exhaust scrubber, June 18, ...
60. Historic plan of Building 202 exhaust scrubber, June 18, 1955. NASA GRC drawing no. CD-101261. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
38. Historic American Buildings Survey ORIGINAL DRAWING, THIRD FLOOR PLAN ...
38. Historic American Buildings Survey ORIGINAL DRAWING, THIRD FLOOR PLAN (FROM THE ORIGINAL IN THE FILES OF THE VICE PRESIDENT FOR DEVELOPMENT AND PHYSICAL PLANT, GEORGETOWN UNIVERSITY) - Georgetown University, Healy Building, Thirty-seventh & O Streets, Northwest, Washington, District of Columbia, DC
a Schema for Extraction of Indoor Pedestrian Navigation Grid Network from Floor Plans
NASA Astrophysics Data System (ADS)
Niu, Lei; Song, Yiquan
2016-06-01
The requirement of the indoor navigation related tasks such emergency evacuation calls for efficient solutions for handling data sources. Therefore, the navigation grid extraction from existing floor plans draws attentions. To this, we have to thoroughly analyse the source data, such as Autocad dxf files. Then, we could establish a sounding navigation solution, which firstly complements the basic navigation rectangle boundaries, secondly subdivides these rectangles and finally generates accessible networks with these refined rectangles. Test files are introduced to validate the whole workflow and evaluate the solution performance. In conclusion, we have achieved the preliminary step of forming up accessible network from the navigation grids.
Silvabase: A flexible data file management system
NASA Technical Reports Server (NTRS)
Lambing, Steven J.; Reynolds, Sandra J.
1991-01-01
The need for a more flexible and efficient data file management system for mission planning in the Mission Operations Laboratory (EO) at MSFC has spawned the development of Silvabase. Silvabase is a new data file structure based on a B+ tree data structure. This data organization allows for efficient forward and backward sequential reads, random searches, and appends to existing data. It also provides random insertions and deletions with reasonable efficiency, utilization of storage space well but not at the expense of speed, and performance of these functions on a large volume of data. Mission planners required that some data be keyed and manipulated in ways not found in a commercial product. Mission planning software is currently being converted to use Silvabase in the Spacelab and Space Station Mission Planning Systems. Silvabase runs on a Digital Equipment Corporation's popular VAX/VMS computers in VAX Fortran. Silvabase has unique features involving time histories and intervals such as in operations research. Because of its flexibility and unique capabilities, Silvabase could be used in almost any government or commercial application that requires efficient reads, searches, and appends in medium to large amounts of almost any kind of data.
Remote imagery for unmanned ground vehicles: the future of path planning for ground robotics
NASA Astrophysics Data System (ADS)
Frederick, Philip A.; Theisen, Bernard L.; Ward, Derek
2006-10-01
Remote Imagery for Unmanned Ground Vehicles (RIUGV) uses a combination of high-resolution multi-spectral satellite imagery and advanced commercial off-the-self (COTS) object-oriented image processing software to provide automated terrain feature extraction and classification. This information, along with elevation data, infrared imagery, a vehicle mobility model and various meta-data (local weather reports, Zobler Soil map, etc...), is fed into automated path planning software to provide a stand-alone ability to generate rapidly updateable dynamic mobility maps for Manned or Unmanned Ground Vehicles (MGVs or UGVs). These polygon based mobility maps can reside on an individual platform or a tactical network. When new information is available, change files are generated and ingested into existing mobility maps based on user selected criteria. Bandwidth concerns are mitigated by the use of shape files for the representation of the data (e.g. each object in the scene is represented by a shape file and thus can be transmitted individually). User input (desired level of stealth, required time of arrival, etc...) determines the priority in which objects are tagged for updates. This paper will also discuss the planned July 2006 field experiment.
A clinically observed discrepancy between image-based and log-based MLC positions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neal, Brian, E-mail: bpn2p@virginia.edu; Ahmed, Mahmoud; Kathuria, Kunal
2016-06-15
Purpose: To present a clinical case in which real-time intratreatment imaging identified an multileaf collimator (MLC) leaf to be consistently deviating from its programmed and logged position by >1 mm. Methods: An EPID-based exit-fluence dosimetry system designed to prevent gross delivery errors was used to capture cine during treatment images. The author serendipitously visually identified a suspected MLC leaf displacement that was not otherwise detected. The leaf position as recorded on the EPID images was measured and log-files were analyzed for the treatment in question, the prior day’s treatment, and for daily MLC test patterns acquired on those treatment days.more » Additional standard test patterns were used to quantify the leaf position. Results: Whereas the log-file reported no difference between planned and recorded positions, image-based measurements showed the leaf to be 1.3 ± 0.1 mm medial from the planned position. This offset was confirmed with the test pattern irradiations. Conclusions: It has been clinically observed that log-file derived leaf positions can differ from their actual position by >1 mm, and therefore cannot be considered to be the actual leaf positions. This cautions the use of log-based methods for MLC or patient quality assurance without independent confirmation of log integrity. Frequent verification of MLC positions through independent means is a necessary precondition to trust log-file records. Intratreatment EPID imaging provides a method to capture departures from MLC planned positions.« less
RivGen, Igiugig Deployment, Control System Specifications and Models
Forbush, Dominic; Cavagnaro, Robert J.; Guerra, Maricarmen; Donegan, James; McEntee, Jarlath; Thomson, Jim; Polagye, Brian; Fabien, Brian; Kilcher, Levi
2016-03-21
Control System simulation models, case studies, and processing codes for analyzing field data. Raw data files included from VFD and SCADA. MatLab and Simulink are required to open some data files and all model files.
Park, So-Yeon; Kim, Il Han; Ye, Sung-Joon; Carlson, Joel; Park, Jong Min
2014-11-01
Texture analysis on fluence maps was performed to evaluate the degree of modulation for volumetric modulated arc therapy (VMAT) plans. A total of six textural features including angular second moment, inverse difference moment, contrast, variance, correlation, and entropy were calculated for fluence maps generated from 20 prostate and 20 head and neck VMAT plans. For each of the textural features, particular displacement distances (d) of 1, 5, and 10 were adopted. To investigate the deliverability of each VMAT plan, gamma passing rates of pretreatment quality assurance, and differences in modulating parameters such as multileaf collimator (MLC) positions, gantry angles, and monitor units at each control point between VMAT plans and dynamic log files registered by the Linac control system during delivery were acquired. Furthermore, differences between the original VMAT plan and the plan reconstructed from the dynamic log files were also investigated. To test the performance of the textural features as indicators for the modulation degree of VMAT plans, Spearman's rank correlation coefficients (rs) with the plan deliverability were calculated. For comparison purposes, conventional modulation indices for VMAT including the modulation complexity score for VMAT, leaf travel modulation complexity score, and modulation index supporting station parameter optimized radiation therapy (MISPORT) were calculated, and their correlations were analyzed in the same way. There was no particular textural feature which always showed superior correlations with every type of plan deliverability. Considering the results comprehensively, contrast (d = 1) and variance (d = 1) generally showed considerable correlations with every type of plan deliverability. These textural features always showed higher correlations to the plan deliverability than did the conventional modulation indices, except in the case of modulating parameter differences. The rs values of contrast to the global gamma passing rates with criteria of 2%/2 mm, 2%/1 mm, and 1%/2 mm were 0.536, 0.473, and 0.718, respectively. The respective values for variance were 0.551, 0.481, and 0.688. In the case of local gamma passing rates, the rs values of contrast were 0.547, 0.578, and 0.620, respectively, and those of variance were 0.519, 0.527, and 0.569. All of the rs values in those cases were statistically significant (p < 0.003). In the cases of global and local gamma passing rates, MISPORT showed the highest correlations among the conventional modulation indices. For global passing rates, rs values of MISPORT were -0.420, -0.330, and -0.632, respectively, and those for local passing rates were -0.455, -0.490 and -0.502. The values of rs of contrast, variance, and MISPORT with the MLC errors were -0.863, -0.828, and 0.795, respectively, all with statistical significances (p < 0.001). The correlations with statistical significances between variance and dose-volumetric differences were observed more frequently than the others. The contrast (d = 1) and variance (d = 1) calculated from fluence maps of VMAT plans showed considerable correlations with the plan deliverability, indicating their potential use as indicators for assessing the degree of modulation of VMAT plans. Both contrast and variance consistently showed better performance than the conventional modulation indices for VMAT.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Teke, T; Milette, MP; Huang, V
2014-08-15
The interplay effect between the tumor motion and the radiation beam modulation during a VMAT treatment delivery alters the delivered dose distribution from the planned one. This work present and validate a method to accurately calculate the dose distribution in 4D taking into account the tumor motion, the field modulation and the treatment starting phase. A QUASAR™ respiratory motion phantom was 4D scanned with motion amplitude of 3 cm and with a 3 second period. A static scan was also acquired with the lung insert and the tumor contained in it centered. A VMAT plan with a 6XFFF beam wasmore » created on the averaged CT and delivered on a Varian TrueBeam and the trajectory log file was saved. From the trajectory log file 10 VMAT plans (one for each breathing phase) and a developer mode XML file were created. For the 10 VMAT plans, the tumor motion was modeled by moving the isocentre on the static scan, the plans were re-calculated and summed in the treatment planning system. In the developer mode, the tumor motion was simulated by moving the couch dynamically during the treatment. Gafchromic films were placed in the QUASAR phantom static and irradiated using the developer mode. Different treatment starting phase were investigated (no phase shift, maximum inhalation and maximum exhalation). Calculated and measured isodose lines and profiles are in very good agreement. For each starting phase, the dose distribution exhibit significant differences but are accurately calculated with the methodology presented in this work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tang, S; Ho, M; Chen, C
Purpose: The use of log files to perform patient specific quality assurance for both protons and IMRT has been established. Here, we extend that approach to a proprietary log file format and compare our results to measurements in phantom. Our goal was to generate a system that would permit gross errors to be found within 3 fractions until direct measurements. This approach could eventually replace direct measurements. Methods: Spot scanning protons pass through multi-wire ionization chambers which provide information about the charge, location, and size of each delivered spot. We have generated a program that calculates the dose in phantommore » from these log files and compares the measurements with the plan. The program has 3 different spot shape models: single Gaussian, double Gaussian and the ASTROID model. The program was benchmarked across different treatment sites for 23 patients and 74 fields. Results: The dose calculated from the log files were compared to those generate by the treatment planning system (Raystation). While the dual Gaussian model often gave better agreement, overall, the ASTROID model gave the most consistent results. Using a 5%–3 mm gamma with a 90% passing criteria and excluding doses below 20% of prescription all patient samples passed. However, the degree of agreement of the log file approach was slightly worse than that of the chamber array measurement approach. Operationally, this implies that if the beam passes the log file model, it should pass direct measurement. Conclusion: We have established and benchmarked a model for log file QA in an IBA proteus plus system. The choice of optimal spot model for a given class of patients may be affected by factors such as site, field size, and range shifter and will be investigated further.« less
Software for Automated Reading of STEP Files by I-DEAS(trademark)
NASA Technical Reports Server (NTRS)
Pinedo, John
2003-01-01
A program called "readstep" enables the I-DEAS(tm) computer-aided-design (CAD) software to automatically read Standard for the Exchange of Product Model Data (STEP) files. (The STEP format is one of several used to transfer data between dissimilar CAD programs.) Prior to the development of "readstep," it was necessary to read STEP files into I-DEAS(tm) one at a time in a slow process that required repeated intervention by the user. In operation, "readstep" prompts the user for the location of the desired STEP files and the names of the I-DEAS(tm) project and model file, then generates an I-DEAS(tm) program file called "readstep.prg" and two Unix shell programs called "runner" and "controller." The program "runner" runs I-DEAS(tm) sessions that execute readstep.prg, while "controller" controls the execution of "runner" and edits readstep.prg if necessary. The user sets "runner" and "controller" into execution simultaneously, and then no further intervention by the user is required. When "runner" has finished, the user should see only parts from successfully read STEP files present in the model file. STEP files that could not be read successfully (e.g., because of format errors) should be regenerated before attempting to read them again.
A Web-based interactive diabetes registry for health care management and planning in Saudi Arabia.
Al-Rubeaan, Khalid A; Youssef, Amira M; Subhani, Shazia N; Ahmad, Najlaa A; Al-Sharqawi, Ahmad H; Ibrahim, Heba M
2013-09-09
Worldwide, eHealth is a rapidly growing technology. It provides good quality health services at lower cost and increased availability. Diabetes has reached an epidemic stage in Saudi Arabia and has a medical and economic impact at a countrywide level. Data are greatly needed to better understand and plan to prevent and manage this medical problem. The Saudi National Diabetes Registry (SNDR) is an electronic medical file supported by clinical, investigational, and management data. It functions as a monitoring tool for medical, social, and cultural bases for primary and secondary prevention programs. Economic impact, in the form of direct or indirect cost, is part of the registry's scope. The registry's geographic information system (GIS) produces a variety of maps for diabetes and associated diseases. In addition to availability and distribution of health facilities in the Kingdom, GIS data provide health planners with the necessary information to make informed decisions. The electronic data bank serves as a research tool to help researchers for both prospective and retrospective studies. A Web-based interactive GIS system was designed to serve as an electronic medical file for diabetic patients retrieving data from medical files by trained registrars. Data was audited and cleaned before it was archived in the electronic filing system. It was then used to produce epidemiologic, economic, and geographic reports. A total of 84,942 patients were registered from 2000 to 2012, growing by 10% annually. The SNDR reporting system for epidemiology data gives better understanding of the disease pattern, types, and gender characteristics. Part of the reporting system is to assess quality of health care using different parameters, such as HbA1c, that gives an impression of good diabetes control for each institute. Economic reports give accurate cost estimation of different services given to diabetic patients, such as the annual insulin cost per patient for type 1, type 2, and gestational diabetes, which are 1155 SR (US $308), 1406 SR (US $375), and 1002 SR (US $267), respectively. Of this, 72.02% of the total insulin cost is spent on type 2 patients and 55.39% is in the form of premixed insulin. The SNDR can provide an accurate assessment of the services provided for research purposes. For example, only 27.00% of registered patients had an ophthalmic examination and only 71.10% of patients with proliferative retinopathy had laser therapy. The SNDR is an effective electronic medical file that can provide epidemiologic, economic, and geographic reports that can be used for disease management and health care planning. It is a useful tool for research and disease health care quality monitoring.
A Web-Based Interactive Diabetes Registry for Health Care Management and Planning in Saudi Arabia
Youssef, Amira M; Subhani, Shazia N; Ahmad, Najlaa A; Al-Sharqawi, Ahmad H; Ibrahim, Heba M
2013-01-01
Background Worldwide, eHealth is a rapidly growing technology. It provides good quality health services at lower cost and increased availability. Diabetes has reached an epidemic stage in Saudi Arabia and has a medical and economic impact at a countrywide level. Data are greatly needed to better understand and plan to prevent and manage this medical problem. Objective The Saudi National Diabetes Registry (SNDR) is an electronic medical file supported by clinical, investigational, and management data. It functions as a monitoring tool for medical, social, and cultural bases for primary and secondary prevention programs. Economic impact, in the form of direct or indirect cost, is part of the registry’s scope. The registry’s geographic information system (GIS) produces a variety of maps for diabetes and associated diseases. In addition to availability and distribution of health facilities in the Kingdom, GIS data provide health planners with the necessary information to make informed decisions. The electronic data bank serves as a research tool to help researchers for both prospective and retrospective studies. Methods A Web-based interactive GIS system was designed to serve as an electronic medical file for diabetic patients retrieving data from medical files by trained registrars. Data was audited and cleaned before it was archived in the electronic filing system. It was then used to produce epidemiologic, economic, and geographic reports. A total of 84,942 patients were registered from 2000 to 2012, growing by 10% annually. Results The SNDR reporting system for epidemiology data gives better understanding of the disease pattern, types, and gender characteristics. Part of the reporting system is to assess quality of health care using different parameters, such as HbA1c, that gives an impression of good diabetes control for each institute. Economic reports give accurate cost estimation of different services given to diabetic patients, such as the annual insulin cost per patient for type 1, type 2, and gestational diabetes, which are 1155 SR (US $308), 1406 SR (US $375), and 1002 SR (US $267), respectively. Of this, 72.02% of the total insulin cost is spent on type 2 patients and 55.39% is in the form of premixed insulin. The SNDR can provide an accurate assessment of the services provided for research purposes. For example, only 27.00% of registered patients had an ophthalmic examination and only 71.10% of patients with proliferative retinopathy had laser therapy. Conclusions The SNDR is an effective electronic medical file that can provide epidemiologic, economic, and geographic reports that can be used for disease management and health care planning. It is a useful tool for research and disease health care quality monitoring. PMID:24025198
Valois, Caroline R A; Silva, Luciano P; Azevedo, Ricardo B
2008-07-01
The purpose of this study was to evaluate the surface of rotary nickel-titanium (Ni-Ti) files after multiple autoclave cycles. Two different types of rotary Ni-Ti (Greater Taper and ProFile) were attached to a glass base. After 1, 5, and 10 autoclave cycles the files were positioned in the atomic force microscope. The analyses were performed on 15 different points. The same files were used as control before any autoclave cycle. The following vertical topographic parameters were measured: arithmetic mean roughness, maximum height, and root mean square. The differences were tested by analysis of variance with Tukey test. All topographic parameters were higher for both Greater Taper and ProFile after 10 cycles compared with the control (P < .05). ProFile also showed higher topographic parameters after 5 cycles compared with the control (P < .05). The results indicated that multiple autoclave cycles increase the depth of surface irregularities located on rotary Ni-Ti files.
78 FR 23134 - Training and Retraining of Miners
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
... follows: Sec. 48.3 Training plans; time of submission; where filed; information required; time for... approved plan containing programs for training new miners, training experienced miners, training miners for... DEPARTMENT OF LABOR Mine Safety and Health Administration 30 CFR Part 48 Training and Retraining...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Collection, Consolidation and Dissemination of Quotation and Transaction Information for Nasdaq-Listed... Exchange, Inc., EDGX Exchange, Inc., Financial Industry Regulatory Authority, Inc., International... Joint Self-Regulatory Organization Plan Governing the Collection, Consolidation, and Dissemination of...
77 FR 37672 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...
8. Historic plan, section, elevation, and detail drawing of Building ...
8. Historic plan, section, elevation, and detail drawing of Building 206, August 26, 1968. NASA GRC drawing number CE-101188 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 206, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Code of Federal Regulations, 2012 CFR
2012-01-01
... occur under the baseline, adverse and severely adverse economic conditions developed by the Board of... conducted by the CIDI since the date of the most recently filed resolution plan to assess the viability of...
"D.L.&W. R.R. New Bergen Tunnel...Details of Shaft..." Plan Sheet. October ...
"D.L.&W. R.R. New Bergen Tunnel...Details of Shaft..." Plan Sheet. October 30, 1908. On file at New Jersey Transit Corporation Headquarters, Newark, New Jersey - Delaware, Lackawanna & Western Railroad, South Bergen Tunnel, Jersey City, Hudson County, NJ
"D.L.&W. R.R. Profile for New Tunnel Through Bergen Hill" Plan ...
"D.L.&W. R.R. Profile for New Tunnel Through Bergen Hill" Plan Sheet. December 1, 1905. On file at New Jersey Transit Corporation Headquarters, Newark, New Jersey - Delaware, Lackawanna & Western Railroad, South Bergen Tunnel, Jersey City, Hudson County, NJ
24 CFR 570.913 - Other remedies for noncompliance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF... their counsel; (vi) Hold conferences for the settlement or simplification of the issues by consent of... Community Planning and Development files an exception and request for review by the Secretary. The excepting...
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA ...
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA RIVER NO. 2 PROJECT, APR. 30, 1945. SCE drawing no. 523643 (sheet no. 14; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA
29 CFR 4041.45 - Distress termination notice.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Single-Employer Plan Termination, with Schedule EA-D, Distress Termination Enrolled Actuary Certification... guaranteed benefits. Unless the enrolled actuary certifies, in the Schedule EA-D filed in accordance with... benefits or benefit liabilities. If the enrolled actuary certifies that the plan is sufficient either for...
29 CFR 4041.45 - Distress termination notice.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Single-Employer Plan Termination, with Schedule EA-D, Distress Termination Enrolled Actuary Certification... guaranteed benefits. Unless the enrolled actuary certifies, in the Schedule EA-D filed in accordance with... benefits or benefit liabilities. If the enrolled actuary certifies that the plan is sufficient either for...
29 CFR 4041.45 - Distress termination notice.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Single-Employer Plan Termination, with Schedule EA-D, Distress Termination Enrolled Actuary Certification... guaranteed benefits. Unless the enrolled actuary certifies, in the Schedule EA-D filed in accordance with... benefits or benefit liabilities. If the enrolled actuary certifies that the plan is sufficient either for...
29 CFR 4041.45 - Distress termination notice.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., Single-Employer Plan Termination, with Schedule EA-D, Distress Termination Enrolled Actuary Certification... guaranteed benefits. Unless the enrolled actuary certifies, in the Schedule EA-D filed in accordance with... benefits or benefit liabilities. If the enrolled actuary certifies that the plan is sufficient either for...
11. Photocopy of Sheet 4 of Building Plan R453 (USDA, ...
11. Photocopy of Sheet 4 of Building Plan R4-53 (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) SIDE ELEVATION AND FRAMING - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
11. Photocopy of Sheet 3 of Building Plan R451, (USDA, ...
11. Photocopy of Sheet 3 of Building Plan R4-51, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) Construction Details and Floor Framing. - Buffalo Guard Station, Office, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
29 CFR 4041.45 - Distress termination notice.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Single-Employer Plan Termination, with Schedule EA-D, Distress Termination Enrolled Actuary Certification... guaranteed benefits. Unless the enrolled actuary certifies, in the Schedule EA-D filed in accordance with... benefits or benefit liabilities. If the enrolled actuary certifies that the plan is sufficient either for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... Acquisition Companies (SPACs) That Have Indicated That Their Business Plan Is To Engage in a Merger or... criteria for listing companies that have indicated that their business plan is to engage in a merger or... criteria for listing companies that have indicated that their business plan is to engage in a merger or...
Code of Federal Regulations, 2010 CFR
2010-04-01
... plan may provide that any such document may be transferred to microfilm or other recording medium after... years or at such earlier date as is specified in a plan for the destruction or disposition of any such documents if such plan has been filed with the Commission by such exchange, association, clearing agency or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Alaska Gas Pipeline LLC; Notice of Request for Approval of Plan for Conducting an Open Season April 8... governing Open Seasons for Alaska Natural Gas Transportation Projects, Denali--The Alaska Gas Pipeline LLC (Denali) filed a Request for Commission Approval of its Plan for Conducting an Open Season. The proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... Regulation NMS under the Act (the ``Limit Up-Limit Down Plan'' or the ``Plan'').\\7\\ The [[Page 60951....10 should continue while the industry gains further experience operating the Limit Up-Limit Down Plan... (May 31, 2012), 77 FR 33498 (June 6, 2012) (the ``Limit Up-Limit Down Release''); see also Rule 7.10(i...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... of Regulation NMS under the Act (the ``Limit Up- Limit Down Plan'' or the ``Plan'').\\7\\ The Exchange... Limit Up-Limit Down Plan. \\5\\ Securities Exchange Act Release No. 62886 (September 10, 2010), 75 FR... (May 31, 2012), 77 FR 33498 (June 6, 2012) (the ``Limit Up-Limit Down Release''); see also Exchange...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... under the Act (the ``Limit Up- Limit Down Plan'' or the ``Plan'').\\7\\ The Exchange believes the benefits... continue while the industry gains further experience operating the Limit Up-Limit Down Plan. \\5\\ See... 33498 (June 6, 2012) (the ``Limit Up-Limit Down Release''); see also Rule 128(i)--Equities. The Exchange...
5. Historic American Buildings Survey 'Plan of Navy Yard at ...
5. Historic American Buildings Survey 'Plan of Navy Yard at Washington Showing the Position and Dimensions of the Ground Plans of all Buildings as They Were 1st January 1858.' Photocopy of original drawing on file at Naval Station Public Works Department, Washington, D.C. - Navy Yard, Main Gate, Eighth & M Streets Southeast, Washington, District of Columbia, DC
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
..., Seneca Nation of Indians, P.O. Box 231, 90 Ohi:yo' Way, Salamanca, NY 14779. i. FERC Contact: Gaylord... site visit is as follows: Date: Wednesday, February 23, 2011. Time: 1:30 p.m. to 4 p.m. Location... identify preliminary information and study needs; (4) review and discuss the process plan and schedule for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-27
... Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation Plan for BOX Options Exchange LLC December 20, 2012. On October 15, 2012, BOX Options Exchange LLC (the ``Exchange'') filed with the... Rule 19d-1(c)(2) under the Act,\\13\\ that the proposed MRVP for BOX Options Exchange LLC, File No. 4-655...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68748; File No. SR-NYSEARCA-2013-02] Self... the Initial Date of Operations of the Regulation NMS Plan To Address Extraordinary Market Volatility... proposed rule change from interested persons. \\1\\ 15 U.S.C.78s(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68745; File No. SR-NYSE-2013-05] Self... the Initial Date of Operations of the Regulation NMS Plan To Address Extraordinary Market Volatility... proposed rule change from interested persons. \\1\\ 15 U.S.C.78s(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... provisions of Rule 19d-1(c)(1) of the Act \\4\\ requiring that a self-regulatory organization promptly file... Commission adopted amendments to paragraph (c) of Rule 19d-1 to allow self-regulatory organizations (``SROs... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-63113; File No. 4-616] Self-Regulatory...
DOT National Transportation Integrated Search
2017-06-26
This zip file contains files of data to support FHWA-JPO-16-370, Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Effectiveness of Proposed Rule Change To Amend Its Minor Rule Violation Plan July 24, 2010. Pursuant to Section... CBOE Rule 17.50--Imposition of Fines for Minor Rule Violations. The text of the proposed rule change is... (``Commission'') approved a CBOE rule filing amending Rule 17.50-- Imposition of Fines for Minor Rule Violations...
42 CFR 423.510 - Termination of contract by the Part D sponsor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... member of the board of directors or board of trustees of the entity, if the organization is organized as a corporation. (f) Timely transfer of data and files. If a contract is terminated under paragraph (a) of this section, the Part D plan sponsor must ensure the timely transfer of any data or files. [70 FR...
42 CFR 423.510 - Termination of contract by the Part D sponsor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... member of the board of directors or board of trustees of the entity, if the organization is organized as a corporation. (f) Timely transfer of data and files. If a contract is terminated under paragraph (a) of this section, the Part D plan sponsor must ensure the timely transfer of any data or files. [70 FR...
76 FR 59446 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... management, banking and investment, event planning, library management, and financial planning files. 5... what happens to records when no longer needed for current Government business. They authorize the... needs them to conduct its business. Some schedules are comprehensive and cover all the records of an...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
...(b). \\11\\ 15 U.S.C. 78f(b)(5). Although the Limit Up-Limit Down Plan will be operational during the... at least through the phased implementation of the Plan is operational will help to protect against... 9083
29 CFR 4050.6 - Payment and required documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...
29 CFR 4050.6 - Payment and required documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...
58. Historic plan, section, and detail drawing of Building 202 ...
58. Historic plan, section, and detail drawing of Building 202 test cell, June 29, 1955. NASA GRC drawing no. CE-101340 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
"D.L.&W. R.R. New Bergen Tunnel...Detail of Portal Masonry..." Plan Sheet. ...
"D.L.&W. R.R. New Bergen Tunnel...Detail of Portal Masonry..." Plan Sheet. Revised December 22, 1906. On file at New Jersey Transit Corporation Headquarters, Newark, New Jersey - Delaware, Lackawanna & Western Railroad, South Bergen Tunnel, Jersey City, Hudson County, NJ
28. PLANS AND SECTIONS OF POWERHOUSE. SANTA ANA NO. 3, ...
28. PLANS AND SECTIONS OF POWERHOUSE. SANTA ANA NO. 3, EXHIBIT L, JAN. 25, 1956 (SHEET 8; FOR FILING WITH FEDERAL POWER COMMISSION). SCE drawing no. 541729. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA
4. PLAN AND PROFILES OF PENSTOCK AND SPILLWAY PIPE, SANTA ...
4. PLAN AND PROFILES OF PENSTOCK AND SPILLWAY PIPE, SANTA ANA NO. 3, EXHIBIT L, JAN. 25, 1956. SCE drawing no. 541726 (sheet 7; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, SAR-3 Forebay & Penstock, Redlands, San Bernardino County, CA
77 FR 9961 - Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-21
... accordance with the provisions of 36 CFR 9.17, Randy Elliott has filed a proposed plan of operations to conduct mining operations on lands embracing Mineral Survey No. 923, patented mineral property within Wrangell-St. Elias National Park and Preserve. Public Availability: This plan of operations is available...