Sample records for control room management

  1. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...

  2. 75 FR 69912 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... 192 and 195 [Docket ID PHMSA-2007-27954] RIN 2137-AE64 Pipeline Safety: Control Room Management/Human... rulemaking; Extension of comment period. SUMMARY: On September 17, 2010, PHMSA published a Control Room... Control Room Management/Human Factors rule at 49 CFR 192.631 and 195.446. The NPRM proposes to expedite...

  3. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING NORTH - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  4. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  5. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING EAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  6. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  7. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written control room management procedures that implement the requirements of this section. The procedures... define the roles and responsibilities of a controller during normal, abnormal, and emergency operating... operator must define each of the following: (1) A controller's authority and responsibility to make...

  8. 76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  9. 75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... following correcting amendments: PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  10. Status quo and current trends of operating room management in Germany.

    PubMed

    Baumgart, André; Schüpfer, Guido; Welker, Andreas; Bender, Hans-Joachim; Schleppers, Alexander

    2010-04-01

    Ongoing healthcare reforms in Germany have required strenuous efforts to adapt hospital and operating room organizations to the needs of patients, new technological developments, and social and economic demands. This review addresses the major developments in German operating room management research and current practice. The introduction of the diagnosis-related group system in 2003 has changed the incentive structure of German hospitals to redesign their operating room units. The role of operating room managers has been gradually changing in hospitals in response to the change in the reimbursement system. Operating room managers are today specifically qualified and increasingly externally hired staff. They are more and more empowered with authority to plan and control operating rooms as profit centers. For measuring performance, common perioperative performance indicators are still scarcely implemented in German hospitals. In 2008, a concerted time glossary was established to enable consistent monitoring of operating room performance with generally accepted process indicators. These key performance indicators are a consistent way to make a procedure or case - and also the effectiveness of the operating room management - more transparent. In the presence of increasing financial pressure, a hospital's executives need to empower an independent operating room management function to achieve the hospital's economic goals. Operating room managers need to adopt evidence-based methods also from other scientific fields, for example management science and information technology, to further sustain operating room performance.

  11. 10 CFR 830 Major Modification Determination for the Advanced Test Reactor Remote Monitoring and Management Capability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bohachek, Randolph Charles

    2015-09-01

    The Advanced Test Reactor (ATR; TRA-670), which is located in the ATR Complex at Idaho National Laboratory, was constructed in the 1960s for the purpose of irradiating reactor fuels and materials. Other irradiation services, such as radioisotope production, are also performed at ATR. While ATR is safely fulfilling current mission requirements, assessments are continuing. These assessments intend to identify areas to provide defense–in-depth and improve safety for ATR. One of the assessments performed by an independent group of nuclear industry experts recommended that a remote accident management capability be provided. The report stated that: “contemporary practice in commercial power reactorsmore » is to provide a remote shutdown station or stations to allow shutdown of the reactor and management of long-term cooling of the reactor (i.e., management of reactivity, inventory, and cooling) should the main control room be disabled (e.g., due to a fire in the control room or affecting the control room).” This project will install remote reactor monitoring and management capabilities for ATR. Remote capabilities will allow for post scram reactor management and monitoring in the event the main Reactor Control Room (RCR) must be evacuated.« less

  12. Economic analysis of linking operating room scheduling and hospital material management information systems for just-in-time inventory control.

    PubMed

    Epstein, R H; Dexter, F

    2000-08-01

    Operating room (OR) scheduling information systems can decrease perioperative labor costs. Material management information systems can decrease perioperative inventory costs. We used computer simulation to investigate whether using the OR schedule to trigger purchasing of perioperative supplies is likely to further decrease perioperative inventory costs, as compared with using sophisticated, stand-alone material management inventory control. Although we designed the simulations to favor financially linking the information systems, we found that this strategy would be expected to decrease inventory costs substantively only for items of high price ($1000 each) and volume (>1000 used each year). Because expensive items typically have different models and sizes, each of which is used by a hospital less often than this, for almost all items there will be no benefit to making daily adjustments to the order volume based on booked cases. We conclude that, in a hospital with a sophisticated material management information system, OR managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the OR information system with the hospital's material management information system to achieve just-in-time inventory control. In a hospital with a sophisticated material management information system, operating room managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the operating room information system with the hospital's material management information system to achieve just-in-time inventory control.

  13. [Prompt control of an imported carbapenem-resistant Acinetobacter baumanii outbreak in a French intensive care unit].

    PubMed

    Guth, C; Cavalli, Z; Pernod, C; Lhopital, C; Wey, Pf; Gerome, P; Turc, J

    2016-01-01

    to describe the management and control of a limited outbreak of carbapenem-resistant Acinetobacter baumanii (CRAB) outbreak in a French intensive care unit. Careful review of the contact's and carrier's files and outbreak management procedures. An undiagnosed CRAB carrier was admitted to our intensive care unit after medical evacuation from Turkey. Despite preventive isolation and contact precautions, a secondary case was diagnosed 5 days after admission of the index case and resulted in the creation of a crisis unit. Prompt management included an epidemiologic investigation with contact screening and follow-up, environmental screening, and additional restrictive measures: isolation room, closure of adjacent rooms, patient cohorting with designated nurses, and reinforcement of contact precautions. restrictive management of CRAB outbreaks may allow prompt outbreak control and avoid prolonged room closures.

  14. 13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED BEHIND MANAGER'S ART DECO-STYLE CONTROL DESK, WITH CONTROL CUBICLE 1 AT FAR RIGHT AND CONTROL CUBICLE 9 AT FAR LEFT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  15. 14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  16. New thinking for the boiler room.

    PubMed

    Rose, Wayne

    2008-09-01

    Wayne Rose, marketing manager at integrated plant room manufacturer Armstrong Integrated Systems, explains how increasing use of off-site manufacture, the latest 3D modelling technology, and advances in control technology, are revolutionising boiler room design and construction.

  17. [Implementation of modern operating room management -- experiences made at an university hospital].

    PubMed

    Hensel, M; Wauer, H; Bloch, A; Volk, T; Kox, W J; Spies, C

    2005-07-01

    Caused by structural changes in health care the general need for cost control is evident for all hospitals. As operating room is one of the most cost-intensive sectors in a hospital, optimisation of workflow processes in this area is of particular interest for health care providers. While modern operating room management is established in several clinics yet, others are less prepared for economic challenges. Therefore, the operating room statute of the Charité university hospital useful for other hospitals to develop an own concept is presented. In addition, experiences made with implementation of new management structures are described and results obtained over the last 5 years are reported. Whereas the total number of operation procedures increased by 15 %, the operating room utilization increased more markedly in terms of time and cases. Summarizing the results, central operating room management has been proved to be an effective tool to increase the efficiency of workflow processes in the operating room.

  18. NASA personnel in a control room during the successful second flight of the X-43A aircraft

    NASA Image and Video Library

    2004-03-27

    NASA personnel in a control room during the successful second flight of the X-43A aircraft. front row, left to right: Randy Voland, LaRC Propulsion; Craig Christy, Boeing Systems; Dave Reubush, NASA Hyper-X Deputy Program Manager; and Vince Rausch, NASA Hyper-X Program Manager. back row, left to right: Bill Talley, DCI/consultant; Pat Stoliker, DFRC Director (Acting) of Research Engineering; John Martin, LaRC G&C; and Dave Bose, AMA/Controls.

  19. KSC-2014-2302

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  20. KSC-2014-2304

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  1. KSC-2014-2303

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  2. Nursing Project Management to Reduce the Operating Room Infection.

    PubMed

    Chen, Yuanyuan; Han, Xiaodao; Xu, Yongjie; Li, Weihua

    2017-02-01

    Nursing project management is widely used in different aspects of the society. However, whether the nursing project management can control the infections in the operation room (OR) is rarely reported. We evaluated the outcomes of surgical patients after implementing a nursing project management program to provide new scientific ways to manage the OR infections. Overall, 382 patients, who underwent surgical treatment in Qilu Hospital of Shandong University, Shandong, China from May 2015 to January 2016, were enrolled as observation group. Besides, 347 cases were selected as control group. Patients in the observation group were treated with the nursing project management plan, while patients in the control group were treated with the routine operation-room nursing measures. The infection control rates in the OR, and the patient satisfaction with the nursing team postoperatively were both compared between the two groups of patients. The OR air, the surgical and personnel's hands surfaces were sampled for colony forming units, and all were found to be significantly of better quality (indicated by less colony forming units) in the observation group (P<0.001). In addition, there were 3 cases (0.79%) of post-operation infections in the observation group, while 12 cases (3.46%) occurred in the control group. The overall infection rate of the observation group was significantly lower than that of the control group (P = 0.011); and the satisfaction of patients with the nursing team in the observation group was significantly higher than that of the patients in the control group ( P = 0.001). It is worth popularizing and applying a good nursing project management plan for surgical patients in hospitals.

  3. [Controlling systems for operating room managers].

    PubMed

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  4. Managing rumor and gossip in operating room settings.

    PubMed

    Blakeley, J A; Ribeiro, V; Hughes, A

    1996-07-01

    The unique features of the operating room (OR) make it an ideal setting for the proliferation of gossip and rumor. Although not always negative, these "grapevine" communications can reduce productivity and work satisfaction. Hence, OR managers need to understand these forms of communication and prevent or control their negative consequences. The authors offer suggestions for undertaking this challenge.

  5. KSC-06pd1204

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  6. Impact of animal-assisted therapy for outpatients with fibromyalgia.

    PubMed

    Marcus, Dawn A; Bernstein, Cheryl D; Constantin, Janet M; Kunkel, Frank A; Breuer, Paula; Hanlon, Raymond B

    2013-01-01

    Animal-assisted therapy using dogs trained to be calm and provide comfort to strangers has been used as a complementary therapy for a range of medical conditions. This study was designed to evaluate the effects of brief therapy dog visits for fibromyalgia patients attending a tertiary outpatient pain management facility compared with time spent in a waiting room. Open label with waiting room control. Tertiary care, university-based, outpatient pain management clinic. A convenience sample of fibromyalgia patients was obtained through advertisements posted in the clinic. Participants were able to spend clinic waiting time with a certified therapy dog instead of waiting in the outpatient waiting area. When the therapy dog was not available, individuals remained in the waiting area. OUTCOME MEASURES.: Self-reported pain, fatigue, and emotional distress were recorded using 11-point numeric rating scales before and after the therapy dog visit or waiting room time. Data were evaluated from 106 therapy dog visits and 49 waiting room controls, with no significant between-group demographic differences in participants. Average intervention duration was 12 minutes for the therapy dog visit and 17 minutes for the waiting room control. Significant improvements were reported for pain, mood, and other measures of distress among patients after the therapy dog visit, but not the waiting room control. Clinically meaningful pain relief (≥2 points pain severity reduction) occurred in 34% after the therapy dog visit and 4% in the waiting room control. Outcome was not affected by the presence of comorbid anxiety or depression. Brief therapy dog visits may provide a valuable complementary therapy for fibromyalgia outpatients. Wiley Periodicals, Inc.

  7. KSC-2014-1969

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  8. KSC-2014-1970

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  9. Study About Ceiling Design for Main Control Room of NPP with HFE

    NASA Astrophysics Data System (ADS)

    Gu, Pengfei; Ni, Ying; Chen, Weihua; Chen, Bo; Zhang, Jianbo; Liang, Huihui

    Recently since human factor engineering (HFE) has been used in control room design of nuclear power plant (NPP), the human-machine interface (HMI) has been gradual to develop harmoniously, especially the use of the digital technology. Comparing with the analog technology which was used to human-machine interface in the past, human-machine interaction has been more enhanced. HFE and the main control room (MCR) design engineering of NPP is a combination of multidisciplinary cross, mainly related to electrical and instrument control, reactor, machinery, systems engineering and management disciplines. However, MCR is not only equipped with HMI provided by the equipments, but also more important for the operator to provide a work environment, such as the main control room ceiling. The ceiling design of main control room related to HFE which influences the performance of staff should also be considered in the design of the environment and aesthetic factors, especially the introduction of professional design experience and evaluation method. Based on Ling Ao phase II and Hong Yanhe project implementation experience, the study analyzes lighting effect, space partition, vision load about the ceiling of main control room of NPP. Combining with the requirements of standards, the advantages and disadvantages of the main control room ceiling design has been discussed, and considering the requirements of lightweight, noise reduction, fire prevention, moisture protection, the ceiling design solution of the main control room also has been discussed.

  10. The keys to CERN conference rooms - Managing local collaboration facilities in large organisations

    NASA Astrophysics Data System (ADS)

    Baron, T.; Domaracky, M.; Duran, G.; Fernandes, J.; Ferreira, P.; Gonzalez Lopez, J. B.; Jouberjean, F.; Lavrut, L.; Tarocco, N.

    2014-06-01

    For a long time HEP has been ahead of the curve in its usage of remote collaboration tools, like videoconference and webcast, while the local CERN collaboration facilities were somewhat behind the expected quality standards for various reasons. This time is now over with the creation by the CERN IT department in 2012 of an integrated conference room service which provides guidance and installation services for new rooms (either equipped for videoconference or not), as well as maintenance and local support. Managing now nearly half of the 246 meeting rooms available on the CERN sites, this service has been built to cope with the management of all CERN rooms with limited human resources. This has been made possible by the intensive use of professional software to manage and monitor all the room equipment, maintenance and activity. This paper focuses on presenting these packages, either off-the-shelf commercial products (asset and maintenance management tool, remote audio-visual equipment monitoring systems, local automation devices, new generation touch screen interfaces for interacting with the room) when available or locally developed integration and operational layers (generic audio-visual control and monitoring framework) and how they help overcoming the challenges presented by such a service. The aim is to minimise local human interventions while preserving the highest service quality and placing the end user back in the centre of this collaboration platform.

  11. [Tele-medicine system for high-risk asthmatic patients].

    PubMed

    Kokubu, F; Suzuki, H; Sano, Y; Kihara, N; Adachi, M

    1999-07-01

    We have developed a tele-medicine system to monitor the airway status at home for patients with poorly controlled asthma, whereby a nurse provides instructions to individuals via the telephone to help them manage exacerbation under the supervision of their physicians. We examined the effectiveness of this system with a randomized control study. Patients with high hospitalization risk were enrolled in the study by screening patients for those with multiple previous emergency room visits and randomly assigned to either the tele-medicine or control group. After six months of participation in the program, the number of emergency room visits decreased significantly and the activities of daily living were improved in the tele-medicine group. Most of the patients in the tele-medicine group were able to continue measuring and transmitting peak expiratory flow (PEF) value successfully, and at six months had noticed an improvement in PEF. We therefore conclude that the system effectively contributes to the management of poorly controlled asthma. In addition, further consideration suggests that the reduction of emergency room visits may lead to reduction in hospitalization since we found a good correlation between number of emergency room visits and hospitalization from the studies published previously.

  12. 9. View southeast corner of perimeter acquisition radar power plant ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. View southeast corner of perimeter acquisition radar power plant room #214, control room; showing central monitoring station console in foreground. Well and booster control panel in left background and electric power management panel on far right - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Power Plant, In Limited Access Area, Southwest of PARB at end of Service Road B, Nekoma, Cavalier County, ND

  13. KSC-2009-5248

    NASA Image and Video Library

    2009-09-25

    CAPE CANAVERAL, Fla. – This ribbon cutting officially turns over NASA Kennedy Space Center's Launch Control Center Firing Room 1 from the Space Shuttle Program to the Constellation Program. Participating are (from left) Pepper Phillips, director of the Constellation Project Office at Kennedy; Bob Cabana, Kennedy's director; Robert Crippen, former astronaut; Jeff Hanley, manager of the Constellation Program at NASA's Johnson Space Center; and Nancy Bray, deputy director of Center Operations at Kennedy. The room has undergone demolition and construction and been outfitted with consoles for the upcoming Ares I-X rocket flight test targeted for launch on Oct. 27. As the center of launch operations at Kennedy since the Apollo Program, the Launch Control Center, or LCC, has played a central role in NASA's human spaceflight programs. Firing Room 1 was the first operational firing room constructed. From this room, controllers launched the first Saturn V, the first crewed flight of Saturn V, the first crewed mission to the moon and the first space shuttle. Firing Room 1 will continue this tradition of firsts when controllers launch the Constellation Program's first flight test. Also, this firing room will be the center of operations for the upcoming Ares I and Orion operations. Photo credit: NASA/Kim Shiflett

  14. KSC-06pd1203

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  15. KSC-06pd1202

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  16. KSC-06pd1201

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  17. The effectiveness of the error reporting promoting program on the nursing error incidence rate in Korean operating rooms.

    PubMed

    Kim, Myoung-Soo; Kim, Jung-Soon; Jung, In Sook; Kim, Young Hae; Kim, Ho Jung

    2007-03-01

    The purpose of this study was to develop and evaluate an error reporting promoting program(ERPP) to systematically reduce the incidence rate of nursing errors in operating room. A non-equivalent control group non-synchronized design was used. Twenty-six operating room nurses who were in one university hospital in Busan participated in this study. They were stratified into four groups according to their operating room experience and were allocated to the experimental and control groups using a matching method. Mann-Whitney U Test was used to analyze the differences pre and post incidence rates of nursing errors between the two groups. The incidence rate of nursing errors decreased significantly in the experimental group compared to the pre-test score from 28.4% to 15.7%. The incidence rate by domains, it decreased significantly in the 3 domains-"compliance of aseptic technique", "management of document", "environmental management" in the experimental group while it decreased in the control group which was applied ordinary error-reporting method. Error-reporting system can make possible to hold the errors in common and to learn from them. ERPP was effective to reduce the errors of recognition-related nursing activities. For the wake of more effective error-prevention, we will be better to apply effort of risk management along the whole health care system with this program.

  18. Altitude Wind Tunnel Control Room at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1944-07-21

    Operators in the control room for the Altitude Wind Tunnel at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory remotely operate a Wright R–3350 engine in the tunnel’s test section. Four of the engines were used to power the B–29 Superfortress, a critical weapon in the Pacific theater during World War II. The wind tunnel, which had been in operation for approximately six months, was the nation’s only wind tunnel capable of testing full-scale engines in simulated altitude conditions. The soundproof control room was used to operate the wind tunnel and control the engine being run in the test section. The operators worked with assistants in the adjacent Exhauster Building and Refrigeration Building to manage the large altitude simulation systems. The operator at the center console controlled the tunnel’s drive fan and operated the engine in the test section. Two sets of pneumatic levers near his right forearm controlled engine fuel flow, speed, and cooling. Panels on the opposite wall, out of view to the left, were used to manage the combustion air, refrigeration, and exhauster systems. The control panel also displayed the master air speed, altitude, and temperature gauges, as well as a plethora of pressure, temperature, and airflow readings from different locations on the engine. The operator to the right monitored the manometer tubes to determine the pressure levels. Despite just being a few feet away from the roaring engine, the control room remained quiet during the tests.

  19. Workflows and individual differences during visually guided routine tasks in a road traffic management control room.

    PubMed

    Starke, Sandra D; Baber, Chris; Cooke, Neil J; Howes, Andrew

    2017-05-01

    Road traffic control rooms rely on human operators to monitor and interact with information presented on multiple displays. Past studies have found inconsistent use of available visual information sources in such settings across different domains. In this study, we aimed to broaden the understanding of observer behaviour in control rooms by analysing a case study in road traffic control. We conducted a field study in a live road traffic control room where five operators responded to incidents while wearing a mobile eye tracker. Using qualitative and quantitative approaches, we investigated the operators' workflow using ergonomics methods and quantified visual information sampling. We found that individuals showed differing preferences for viewing modalities and weighting of task components, with a strong coupling between eye and head movement. For the quantitative analysis of the eye tracking data, we propose a number of metrics which may prove useful to compare visual sampling behaviour across domains in future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. 76 FR 57771 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Securities and Exchange Commission (``Commission'') has submitted to the Office of Management and Budget... display a valid Office of Management and Budget (OMB) control number. Background documentation for this... Regulatory Affairs, Office of Management and Budget, Room 10102, New Executive Office Building, Washington...

  1. 76 FR 75921 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Securities and Exchange Commission (``Commission'') has submitted to the Office of Management and Budget... of Management and Budget (OMB) control number. The public may view the background documentation for... Regulatory Affairs, Office of Management and Budget, Room 10102, New Executive Office Building, Washington...

  2. STS-127 Firing Room

    NASA Image and Video Library

    2009-07-11

    Mike Suffredini, NASA Manager, International Space Station (ISS) Program, talks with other NASA mission managers in from Firing Room Four of the Launch Control Center at NASA's Kennedy Space Center in Cape Canaveral, Florida, Sunday, July 12, 2009. The space shuttle Endeavour is set to launch at 7:13p.m. EDT with the crew of STS-127 and start a 16-day mission that will feature five spacewalks and complete construction of the Japan Aerospace Exploration Agency's Kibo laboratory. Photo Credit: (NASA/Bill Ingalls)

  3. Impact of Illness Management and Recovery Programs on Hospital and Emergency Room Use by Medicaid Enrollees

    PubMed Central

    Salyers, Michelle P.; Rollins, Angela L.; Clendenning, Daniel; McGuire, Alan B.; Kim, Edward

    2011-01-01

    Objective Illness management and recovery is a structured program that helps consumers with severe mental illness learn effective ways to manage illness and pursue recovery goals. This study examined the impact of the program on health service utilization. Methods This was a retrospective cohort study of five assertive community treatment (ACT) teams in Indiana that implemented illness management and recovery. With Medicaid claims data from July 1, 2003, to June 30, 2008, panel data were created with person-months as the level of analysis, resulting in 14,261 observations, for a total of 498 unique individuals. Zero-inflated negative binomial regression models were used to predict hospitalization days and emergency room visits, including covariates of demographic characteristics, employment status, psychiatric diagnosis, and concurrent substance use disorder. The main predictor variables of interest were receipt of illness management and recovery services, dropout from the program, and program graduation status. Results Consumers who received some illness management and recovery services had fewer hospitalization days than those receiving only ACT. Graduates had fewer emergency room visits than did ACT-only consumers. Conclusions This is the first study to examine the impact of illness management and recovery on service utilization. Controlling for a number of background variables, the study showed that illness management and recovery programs were associated with reduced inpatient hospitalization and emergency room use over and above ACT. PMID:21532077

  4. 42 CFR 7.5 - Payment procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... obtain information on terms of payment and a fee schedule by writing the “Centers for Disease Control,” Financial Management Office, Buckhead Facility, Room 200, Centers for Disease Control, 1600 Clifton Road...

  5. 42 CFR 7.5 - Payment procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... obtain information on terms of payment and a fee schedule by writing the “Centers for Disease Control,” Financial Management Office, Buckhead Facility, Room 200, Centers for Disease Control, 1600 Clifton Road...

  6. 77 FR 36019 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Securities and Exchange Commission (``Commission'') has submitted to the Office of Management and Budget a... Management and Budget (OMB) control number. The public may view the background documentation for this... of Management and Budget, Room 10102, New Executive Office Building, Washington, DC 20503, or by...

  7. Governing time in operating rooms.

    PubMed

    Riley, Robin; Manias, Elizabeth

    2006-05-01

    This paper examines how time is controlled and governed in operating rooms through interpersonal communication between nurses and doctors. Time is a valuable commodity in organizations with improvements often directed towards maximizing efficiencies. As a consequence, time can be a source of tension and interpersonal conflict as individuals compete for control of its use. The data in this paper emanate from an ethnographic study that explored a range of communication practices in operating room nursing. Participants comprised 11 operating room nurses. Data were collected over two years in three different institutional settings and involved participant observation, interviews and the keeping of a personal diary. A deconstructive analysis of the data was undertaken. Results are discussed in terms of the practices, in which clinicians are engaged in, to govern and control their use of time. The four practices presented in this paper include; questioning judgment and timing, controlling speed, estimating surgeons' use of time and coping with different perceptions of time. Time and speed were hotly contested by nurses. They used their personal knowledge of individual surgeon's habits of time to govern and control practice. Nurses thought about surgeons in terms of time and developed commonly accepted understandings about the length of surgical procedures. They used this knowledge to manage the scheduling of operations in the departments and to control the workflow in individual operating rooms. Knowledge of individual surgeons was a source of power for operating room nurses. Nurses have more power in the operating room than might be imagined but they exercise this power in subtle ways. If operating rooms are to work effectively, the operating room team must understand each others' work better.

  8. Virtual reality as a human factors design analysis tool: Macro-ergonomic application validation and assessment of the Space Station Freedom payload control area

    NASA Technical Reports Server (NTRS)

    Hale, Joseph P.

    1994-01-01

    A virtual reality (VR) Applications Program has been under development at MSFC since 1989. Its objectives are to develop, assess, validate, and utilize VR in hardware development, operations development and support, missions operations training, and science training. A variety of activities are under way within many of these areas. One ongoing macro-ergonomic application of VR relates to the design of the Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed. Several preliminary conceptual PCA layouts have been developed and modeled in VR. Various managers and potential end users have virtually 'entered' these rooms and provided valuable feedback. Before VR can be used with confidence in a particular application, it must be validated, or calibrated, for that class of applications. Two associated validation studies for macro-ergonomic applications are under way to help characterize possible distortions of filtering of relevant perceptions in a virtual world. In both studies, existing control rooms and their 'virtual counterparts will be empirically compared using distance and heading estimations to objects and subjective assessments. Approaches and findings of the PCA activities and details of the studies are presented.

  9. Launch of Space Shuttle Atlantis / STS-129 Mission

    NASA Image and Video Library

    2009-11-16

    STS129-S-057 (16 Nov. 2009) --- From left, LeRoy Cain, NASA's deputy manager, Space Shuttle Program; Michael Coats, director of NASA's Johnson Space Center; and Bob Cabana, director of NASA's Kennedy Space Center, watch the launch of Space Shuttle Atlantis from the Operations Management Room, a glass partitioned area overlooking the main floor of Firing Room 4, in Kennedy's Launch Control Center. Liftoff of Atlantis from Launch Pad 39A on its STS-129 mission to the International Space Station came at 2:28 p.m. (EST) Nov. 16, 2009.

  10. The critically ill injured patient.

    PubMed

    Cereda, Maurizio; Weiss, Yoram G; Deutschman, Clifford S

    2007-03-01

    Patients admitted to the ICU after severe trauma require frequent procedures in the operating room, particularly in cases where a damage control strategy is used. The ventilatory management of these patients in the operating room can be particularly challenging. These patients often have severely impaired respiratory mechanics because of acute lung injury and abdominal compartment syndrome. Consequently, the pressure and flow generation capabilities of standard anesthesia ventilators may be inadequate to support ventilation and gas exchange. This article presents the problems that may be encountered in patients who have severe abdominal and lung injuries, and the current management concepts used in caring for these patients in the critical care setting, to provide guidelines for the anesthetist faced with these patients in the operating room.

  11. 77 FR 67613 - Patterns of Safety Violations by Motor Carrier Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Internet, you may view the docket online by visiting the Docket Management Facility in Room W12-140 on the... occurred in Sherman, Texas, highlighting the danger posed by motor carriers and other persons who avoid... authority registration for failing to disclose, among other things, common management or control with any...

  12. Liquid Pipeline Operator's Control Room Human Factors Risk Assessment and Management Guide

    DOT National Transportation Integrated Search

    2008-11-26

    The purpose of this guide is to document methodologies, tools, procedures, guidance, and instructions that have been developed to provide liquid pipeline operators with an efficient and effective means of managing the human factors risks in their con...

  13. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    DOT National Transportation Integrated Search

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  14. 77 FR 5614 - Shipping Coordinating Committee; Notice of Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... statistics and investigations; Harmonization of port State control activities; Port State Control (PSC...; Development of guidelines on port State control under the 2004 Ballast Water Management (BWM) Convention... of the room. To facilitate the building security process, and to request reasonable accommodation...

  15. Litter aeration and spread of Salmonella in broilers.

    PubMed

    Bodí, Sara González; Garcia, Arantxa Villagra; García, Santiago Vega; Orenga, Clara Marín

    2013-08-01

    Litter quality in the poultry sector is one of the main parameters of health, productivity, and animal welfare. Therefore, innovative management methods have been developed to improve the quality of litter. One of them is litter aeration (LA) by tumbling. However, there is little information related to the effect of this technique on the spreading of pathogens of public health importance such as Salmonella. In this context, the objective of this study was to determine the epidemiology of Salmonella in poultry farms, when serial LA were implemented during the rearing cycle of broilers. For this purpose, an experimental broiler farm with 3 identical rooms was used in the study. Two rooms were assigned to the LA treatment, and the other one served as the control room. Environmental samples were taken in poultry houses after LA in 4 consecutive weeks at the end of the cycle. All samples collected were analyzed according to the standards of the International Organization for Standardization (ISO 6579:2002, Annex D). The results of this study showed that in the control and treated rooms, the percentage of positive samples for Salmonella decreased in the first 3 LA sessions (LA 1, LA 2, and LA 3). However, in the last LA session of rearing (LA 4), the percentage of positive samples increased from 8.2 to 33.2% in the control room instead the treated rooms where the positive samples decreased (P = 0.017). Thus, the aeration of the litter as litter management technique in poultry broiler production does not increase the shedding or the spread of Salmonella throughout broiler houses. In addition, it could be an effective technique to reduce the infective pressure of this bacterium in several areas of the farm or in certain moments of the rearing period with more risk of multiplication and spreading of Salmonella.

  16. Cost-benefit analysis of different air change rates in an operating room environment.

    PubMed

    Gormley, Thomas; Markel, Troy A; Jones, Howard; Greeley, Damon; Ostojic, John; Clarke, James H; Abkowitz, Mark; Wagner, Jennifer

    2017-12-01

    Hospitals face growing pressure to meet the dual but often competing goals of providing a safe environment while controlling operating costs. Evidence-based data are needed to provide insight for facility management practices to support these goals. The quality of the air in 3 operating rooms was measured at different ventilation rates. The energy cost to provide the heating, ventilation, and air conditioning to the rooms was estimated to provide a cost-benefit comparison of the effectiveness of different ventilation rates currently used in the health care industry. Simply increasing air change rates in the operating rooms tested did not necessarily provide an overall cleaner environment, but did substantially increase energy consumption and costs. Additionally, and unexpectedly, significant differences in microbial load and air velocity were detected between the sterile fields and back instrument tables. Increasing the ventilation rates in operating rooms in an effort to improve clinical outcomes and potentially reduce surgical site infections does not necessarily provide cleaner air, but does typically increase operating costs. Efficient distribution or management of the air can improve quality indicators and potentially reduce the number of air changes required. Measurable environmental quality indicators could be used in lieu of or in addition to air change rate requirements to optimize cost and quality for an operating room and other critical environments. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  17. Views of the mission control center during STS-9

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Busy moment in the customer management room (CMR) of JSC's mission control center during Spacelab 1 day 2. Three personnel from the European Space Agency (ESA) huddle around a console along with Ralph Hoodless (seated at left), of the George C. Marshall Space Flight Center. Others pictured are Lars Tedeman and Hildegard Binck (standing); and Frank Longhurst (seated right). Tedeman is with ESA's quality control division and Longhurst is Spacelab operations manager.

  18. Management of patients infected with airborne-spread diseases: an algorithm for infection control professionals.

    PubMed

    Rebmann, Terri

    2005-12-01

    Many US hospitals lack the capacity to house safely a surge of potentially infectious patients, increasing the risk of secondary transmission. Respiratory protection and negative-pressure rooms are needed to prevent transmission of airborne-spread diseases, but US hospitals lack available and/or properly functioning negative-pressure rooms. Creating new rooms or retrofitting existing facilities is time-consuming and expensive. Safe methods of managing patients with airborne-spread diseases and establishing temporary negative-pressure and/or protective environments were determined by a literature review. Relevant data were analyzed and synthesized to generate a response algorithm. Ideal patient management and placement guidelines, including instructions for choosing respiratory protection and creating temporary negative-pressure or other protective environments, were delineated. Findings were summarized in a treatment algorithm. The threat of bioterrorism and emerging infections increases health care's need for negative-pressure and/or protective environments. The algorithm outlines appropriate response steps to decrease transmission risk until an ideal protective environment can be utilized. Using this algorithm will prepare infection control professionals to respond more effectively during a surge of potentially infectious patients following a bioterrorism attack or emerging infectious disease outbreak.

  19. MOCR activity during Day 4 of STS-3 mission

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Major General J.A. Abrahamson, right, talks to JSC Director Christopher C. Kraft, Jr., (seated left) and Space Shuttle Program Manager Glynn S. Lunney on the back row of consoles in the mission operations control room (MOCR) in the Johnson Space Center mission control center. The reflection behind the men is a window for the MOCR viewing room (28772,28775); Abrahamson, second right, talks to JSC's Aaron Cohen, right, as Kraft (seated left) and Lunney listen in mission control (28773); Flight controller J.E. Connor monitors a television transmission from the Space Shuttle Columbia during day 4 of the STS-3 mission. Conner is seated at his INCO console (28774).

  20. Healthcare utilization in women after abdominal surgery for ovarian cancer.

    PubMed

    McCorkle, Ruth; Jeon, Sangchoon; Ercolano, Elizabeth; Schwartz, Peter

    2011-01-01

    Women undergoing surgery for ovarian cancer are severely ill and are high users of health services. Contributing to these increased utilization rates are the multiple modalities used to treat ovarian cancer and the complications and side effects from those treatments. The purpose of this study was to evaluate the effectiveness of an intervention provided by advanced practice nurses and a psychiatric consultation-liaison nurse on patients' self-report of healthcare utilization compared with an attention control intervention in women undergoing surgery for a suspected diagnosis of ovarian cancer. A two-group, experimental, longitudinal design was used to compare women who were assigned randomly to the intervention group or to an attention control group at baseline within 48 hours after surgery and 1, 3, and 6 months after surgery. Healthcare utilization was measured as the number of self-reported inpatient admissions and outpatient visits, including emergency room visits, oncology outpatient visits, and primary care visits. Nurse interventions consisted of 16 contacts: symptom management, counseling, education, direct nursing care, coordination of resources, and referrals. The attention control interventions consisted of nine contacts that included instructions on use of a symptom management toolkit and strategies on how to manage symptoms. There were no differences in hospitalizations and oncology outpatient visits between the two groups. The main finding of this study was a significant difference in the number of primary care visits between the two groups. Women in the attention control group went to their primary care providers more often than the intervention group. The women who reported more visits also reported more depressive symptoms. In addition, a trend was found in the number of emergency room visits between the two groups. The intervention group visited the emergency room more often because the nurse instructed patients to go when they recognized symptoms that needed urgent care after hours. Women in the intervention group appropriately used the emergency room to manage their problems after hours, whereas more women in the attention control group reported significantly more primary care visits. These findings highlight the need for healthcare providers representing various disciplines to coordinate services across specialties, especially for women who have depressive symptoms.

  1. 77 FR 44714 - Proposed Agency Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... displays a currently valid Office of Management and Budget (OMB) control number. The Federal Financial Institutions Examination Council (FFIEC), of which the agencies are members, has approved the agencies... Management and Budget, New Executive Office Building, Room 10235, 725 17th Street NW., [[Page 44715...

  2. A Study of Central Sterilization Room (CSR) Control and Organization at the Naval Regional Medical Center, Oakland, California.

    DTIC Science & Technology

    1979-08-01

    management and under overall supervicion of a supervisour nurse (08-9) in charge of CSR . Individual will have operational responsibility for CSR ...mD~ ; EL ::%~ rl- CgROCOPV RESOtUTIOI TEST CMMR NAUT ON AM OF SrAsfas-ua4 I C41 0 A STUDY OF CENTRAL STERILIZATION ROOM ( CSR )a CONTROL...MUEtsrbt niie PERORIN ONIATIO C OD IS. U3JECT TR S. MNITOIN ORAIZTO REPORT NUMBER S) inres NAEmpai On theORIN organisatioN an managemen ofC theBO CSR

  3. The 'Room within a Room' Concept for Monitored Warhead Dismantlement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanner, Jennifer E.; Benz, Jacob M.; White, Helen

    2014-12-01

    Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deploymentmore » of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was effective but the individual technologies used to create the system deployed during this exercise required further development.« less

  4. Installation and management of the SPS and LEP control system computers

    NASA Astrophysics Data System (ADS)

    Bland, Alastair

    1994-12-01

    Control of the CERN SPS and LEP accelerators and service equipment on the two CERN main sites is performed via workstations, file servers, Process Control Assemblies (PCAs) and Device Stub Controllers (DSCs). This paper describes the methods and tools that have been developed to manage the file servers, PCAs and DSCs since the LEP startup in 1989. There are five operational DECstation 5000s used as file servers and boot servers for the PCAs and DSCs. The PCAs consist of 90 SCO Xenix 386 PCs, 40 LynxOS 486 PCs and more than 40 older NORD 100s. The DSCs consist of 90 OS-968030 VME crates and 10 LynxOS 68030 VME crates. In addition there are over 100 development systems. The controls group is responsible for installing the computers, starting all the user processes and ensuring that the computers and the processes run correctly. The operators in the SPS/LEP control room and the Services control room have a Motif-based X window program which gives them, in real time, the state of all the computers and allows them to solve problems or reboot them.

  5. The Asthma Management Program as a Predictor of Emergency Room Visits and Hospitalizations at David Grant USAF Medical Center

    DTIC Science & Technology

    1998-08-01

    tracked continuously, Asthma Management 2 thereby adding new opportunities for patient education other than at the hospital or physician’s office...avoided with more consistent patient education and follow-up (Collins, Goodman & McQueston, 1995). Asthma Management Program at DGMC The Asthma...management, 2) objective measures of lung function, 3) environmental control, and 4) patient education . Proactive case management programs that

  6. Justification of Natural Lighting Management for Workplaces with Displays

    NASA Astrophysics Data System (ADS)

    Kudryashov, A. V.; Erunova, A. V.; Kalinina, A. S.

    2017-11-01

    The article is devoted to the study of the influence of the orientation of light apertures (windows) on the distribution of illumination in a room inside the workplaces equipped with displays. The measurements of natural light were carried out in two similar rooms, in the first room the windows are oriented to the north and in the second - to the south. The normative illumination value in a workplace equipped with a personal computer or display must be between 300 and 500 lux. However, during the daytime, the value of natural illumination at the workplace can exceed the normalized value by several times, and in the morning and evening hours is not sufficient. Such distribution of illumination involves the use a combined lighting control system (with daylight time control and switching on artificial lighting in the morning and evening hours). In the article it is justified that the orientation of the windows in the room does not have a significant effect on the distribution of illumination throughout the room which makes it possible not to take into account the restrictions concerning the orientation of the room’s light apertures when combined lighting control systems are used.

  7. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to exceed 15 months; and (5) Establish and implement procedures for when a different controller..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  8. The uncertainty room: strategies for managing uncertainty in a surgical waiting room.

    PubMed

    Stone, Anne M; Lammers, John C

    2012-01-01

    To describe experiences of uncertainty and management strategies for staff working with families in a hospital waiting room. A 288-bed, nonprofit community hospital in a Midwestern city. Data were collected during individual, semistructured interviews with 3 volunteers, 3 technical staff members, and 1 circulating nurse (n = 7), and during 40 hours of observation in a surgical waiting room. Interview transcripts were analyzed using constant comparative techniques. The surgical waiting room represents the intersection of several sources of uncertainty that families experience. Findings also illustrate the ways in which staff manage the uncertainty of families in the waiting room by communicating support. Staff in surgical waiting rooms are responsible for managing family members' uncertainty related to insufficient information. Practically, this study provided some evidence that staff are expected to help manage the uncertainty that is typical in a surgical waiting room, further highlighting the important role of communication in improving family members' experiences.

  9. Environmental Assessment for Hawaii Tracking Station A-Side Antenna Remote Block Change Upgrade at Kaena Point Satellite Tracking Station, Hawaii

    DTIC Science & Technology

    2011-02-01

    Heating, Ventilation, Air Conditioning (HVAC) system to environmentally control the HPA Room as well as a Mechanical Room to house the new diesel ...Rickie D. Moon, Senior Systems Engineer MS, Environmental Management, Samford University BS, Chemistry and Mathematics, Samford University 28...Huntsville 16 LPES, Inc. Timothy Lavallee, PE, Principal/Senior Engineer BS, Mechanical Engineering , Northeastern University MS, Civil and

  10. [Operation room management in quality control certification of a mainstream hospital].

    PubMed

    Leidinger, W; Meierhofer, J N; Schüpfer, G

    2006-11-01

    We report the results of our study concerning the organisation of operating room (OR) capacity planned 1 year in advance. The use of OR is controlled using 2 global controlling numbers: a) the actual time difference between the expected optimal and previously calculated OR running time and b) the punctuality of starting the first operation in each OR. The focal point of the presented OR management concept is a consensus-oriented decision-making and steering process led by a coordinator who achieves a high degree of acceptance by means of comprehensive transparency. Based on the accepted running time, the optimal productivity of OR's (OP_A(%) can be calculated. In this way an increase of the overall capacity (actual running time) of ORs was from 40% to over 55% was achieved. Nevertheless, enthusiasm and teamwork from all persons involved in the system are vital for success as well as a completely independent operating theatre manager. Using this concept over 90% of the requirements for the new certification catalogue for hospitals in Germany was achieved.

  11. Delivery room management of very low birth weight infants in Germany, Austria and Switzerland - a comparison of protocols

    PubMed Central

    2010-01-01

    Background Surveys from the USA, Australia and Spain have shown significant inter-institutional variation in delivery room (DR) management of very low birth weight infants (VLBWI, < 1500 g) at birth, despite regularly updated international guidelines. Objective To investigate protocols for DR management of VLBWI in Germany, Austria and Switzerland and to compare these with the 2005 ILCOR guidelines. Methods DR management protocols were surveyed in a prospective, questionnaire-based survey in 2008. Results were compared between countries and between academic and non-academic units. Protocols were compared to the 2005 ILCOR guidelines. Results In total, 190/249 units (76%) replied. Protocols for DR management existed in 94% of units. Statistically significant differences between countries were found regarding provision of 24 hr in house neonatal service; presence of a designated resuscitation area; devices for respiratory support; use of pressure-controlled manual ventilation devices; volume control by respirator; and dosage of Surfactant. There were no statistically significant differences regarding application and monitoring of supplementary oxygen, or targeted saturation levels, or for the use of sustained inflations. Comparison of academic and non-academic hospitals showed no significant differences, apart from the targeted saturation levels (SpO2) at 10 min. of life. Comparison with ILCOR guidelines showed good adherence to the 2005 recommendations. Summary Delivery room management in German, Austrian and Swiss neonatal units was commonly based on written protocols. Only minor differences were found regarding the DR setup, devices used and the targeted ranges for SpO2 and FiO2. DR management was in good accordance with 2005 ILCOR guidelines, some units already incorporated evidence beyond the ILCOR statement into their routine practice. PMID:21159574

  12. Dillard Drive Middle & Elementary School, Raleigh, North Carolina.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design features of the Dillard Drive Middle & Elementary School (North Carolina) that incorporates daylighting in the majority of the classrooms, the gymnasium, dining room, and media center. The design also uses advanced lighting controls, fiber optic networking, automatic environmental controls, and an energy management system that…

  13. Under Control.

    ERIC Educational Resources Information Center

    McLawhorn, Kerry

    2001-01-01

    Explains how the Scotland County School District in Laurinburg, North Carolina, tackled the problem of controlling building and room keys for fifteen K-12 schools and 7,000 students by marrying a computerized records management system for key tracking with a patented hardware system that produces keys that can't be duplicated. (GR)

  14. Operating room management and operating room productivity: the case of Germany.

    PubMed

    Berry, Maresi; Berry-Stölzle, Thomas; Schleppers, Alexander

    2008-09-01

    We examine operating room productivity on the example of hospitals in Germany with independent anesthesiology departments. Linked to anesthesiology group literature, we use the ln(Total Surgical Time/Total Anesthesiologists Salary) as a proxy for operating room productivity. We test the association between operating room productivity and different structural, organizational and management characteristics based on survey data from 87 hospitals. Our empirical analysis links improved operating room productivity to greater operating room capacity, appropriate scheduling behavior and management methods to realign interests. From this analysis, the enforcing jurisdiction and avoiding advance over-scheduling appear to be the implementable tools for improving operating room productivity.

  15. Wireless Occupancy Sensors for Lighting Controls: An Applications Guide for Federal Facility Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This guide provides federal facility managers with an overview of the energy savings potential of wireless lighting occupancy sensors for various room types, cost considerations, key steps to successful installation of wireless sensors, pros and cons of various technology options, light source considerations, and codes and standards.

  16. 77 FR 9727 - Agency Information Collection Activities: Submission for OMB Review; Joint Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... currently valid Office of Management and Budget (OMB) control number. On November 21, 2011, the agencies.... Office of Management and Budget, New Executive Office Building, Room 10235, 725 17th Street NW... and reporting treatment for capital contributions in the form of cash or notes receivable. Further...

  17. 76 FR 50276 - STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Notice of Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...

  18. Virtual visual effect of hospital waiting room on pain modulation in healthy subjects and patients with chronic migraine.

    PubMed

    de Tommaso, Marina; Ricci, Katia; Laneve, Luigi; Savino, Nicola; Antonaci, Vincenzo; Livrea, Paolo

    2013-01-01

    Environmental context has an important impact on health and well being. We aimed to test the effects of a visual distraction induced by classical hospital waiting room (RH) versus an ideal room with a sea view (IH), both represented in virtual reality (VR), on subjective sensation and cortical responses induced by painful laser stimuli (LEPs) in healthy volunteers and patients with chronic migraine (CM). Sixteen CM and 16 controls underwent 62 channels LEPs from the right hand, during a fully immersive VR experience, where two types of waiting rooms were simulated. The RH simulated a classical hospital waiting room while the IH represented a room with sea viewing. CM patients showed a reduction of laser pain rating and vertex LEPs during the IH vision. The sLORETA analysis confirmed that in CM patients the two VR simulations induced a different modulation of bilateral parietal cortical areas (precuneus and superior parietal lobe), and superior frontal and cingulate girus, in respect to controls. The architectural context may interfere with pain perception, depending upon the status of subject. Many variables may change patients' outcome and support the use of VR technology to test the best conditions for their management.

  19. Bed Bug Prevention, Detection and Control

    EPA Pesticide Factsheets

    Tips in this brochure include inspecting and cleaning second-hand furniture, inspection and prevention in hotel rooms, recognizing bites, integrated pest management, safe pesticide use, signs of infestation, and using mattress and box spring encasements.

  20. STS-127 Firing Room

    NASA Image and Video Library

    2009-07-11

    NASA mission managers watch the latest weather radar on a monitor in Firing Room Four of the Launch Control Center at NASA's Kennedy Space Center in Cape Canaveral, Florida, Sunday, July 12, 2009. Endeavour is set to launch at 7:13p.m. EDT with the crew of STS-127 and start a 16-day mission that will feature five spacewalks and complete construction of the Japan Aerospace Exploration Agency's Kibo laboratory. Photo Credit: (NASA/Bill Ingalls)

  1. STS-127 Firing Room

    NASA Image and Video Library

    2009-07-11

    Bob Cabana, Director of NASA's Kennedy Space Center talks with other mission managers in Firing Room Four of the Launch Control Center at NASA's Kennedy Space Center in Cape Canaveral, Florida, Sunday, July 12, 2009. Endeavour is set to launch at 7:13p.m. EDT with the crew of STS-127 and start a 16-day mission that will feature five spacewalks and complete construction of the Japan Aerospace Exploration Agency's Kibo laboratory. Photo Credit: (NASA/Bill Ingalls)

  2. 77 FR 729 - Airworthiness Directives; Enstrom Helicopter Corporation Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... subsequent loss of control of the helicopter. DATES: This AD becomes effective January 23, 2012. The Director... Program Manager, FAA, Chicago Aircraft Certification Office, 2300 East Devon Avenue, Room 107, Des Plaines... the circuit breaker to trip before any significant loss of control occurs. After the trim actuator...

  3. The utilization of six sigma and statistical process control techniques in surgical quality improvement.

    PubMed

    Sedlack, Jeffrey D

    2010-01-01

    Surgeons have been slow to incorporate industrial reliability techniques. Process control methods were applied to surgeon waiting time between cases, and to length of stay (LOS) after colon surgery. Waiting times between surgeries were evaluated by auditing the operating room records of a single hospital over a 1-month period. The medical records of 628 patients undergoing colon surgery over a 5-year period were reviewed. The average surgeon wait time between cases was 53 min, and the busiest surgeon spent 291/2 hr in 1 month waiting between surgeries. Process control charting demonstrated poor overall control of the room turnover process. Average LOS after colon resection also demonstrated very poor control. Mean LOS was 10 days. Weibull's conditional analysis revealed a conditional LOS of 9.83 days. Serious process management problems were identified in both analyses. These process issues are both expensive and adversely affect the quality of service offered by the institution. Process control mechanisms were suggested or implemented to improve these surgical processes. Industrial reliability and quality management tools can easily and effectively identify process control problems that occur on surgical services. © 2010 National Association for Healthcare Quality.

  4. Benefits of traffic safety facilities installed by police of Japan

    DOT National Transportation Integrated Search

    2000-11-09

    Presentation at the International workshop on ITS benefits held Thursday, November 9, 2000, Madrid Room, Lingotto Centre, Turin, Italy. : The presentation covers: : -UTMS(Universal Traffic Management Systems) : -ITCS(Integrated Traffic Control System...

  5. Effectiveness of Educational Poster on Knowledge of Emergency Management of Dental Trauma–Part 1. Cluster Randomised Controlled Trial for Primary and Secondary School Teachers

    PubMed Central

    Young, Cecilia; Wong, Kin Yau; Cheung, Lim K.

    2013-01-01

    Objective To investigate the effectiveness of educational posters in improving the knowledge level of primary and secondary school teachers regarding emergency management of dental trauma. Methods A cluster randomised controlled trial was conducted. 32 schools with a total of 515 teachers were randomised into intervention (poster) and control groups at the school level. Teachers’ baseline levels of knowledge about dental trauma were obtained by using a questionnaire. Posters containing information on dental trauma management were displayed in the school medical room, the common room used by staff, and on a notice board for 2 weeks in each school of the intervention group; in the control group, no posters were displayed. Teachers in both groups completed the questionnaire after 2 weeks. Results The teachers in the intervention schools (where posters were displayed for 2 weeks) showed statistically significant improvement in scores in cases where they had not previously learned about dental emergencies from sources other than first aid training, with an average score increase of 2.6656 (score range of questionnaire, −13 to 9; p-value <0.0001). Conclusion Educational posters on the management of dental trauma can significantly improve the level of knowledge of primary and secondary school teachers in Hong Kong. KClinicalTrials.com HKCTR-1307 ClinicalTrials.gov: NCT01707355 PMID:24147154

  6. Surgical timing of treating injured extremities: an evolving concept of urgency.

    PubMed

    Crist, Brett D; Ferguson, Tania; Murtha, Yvonne M; Lee, Mark A

    2013-01-01

    The management of some orthopaedic extremity injuries has changed over the past decade because of changing resource availability and the risks of complications. It is helpful to review the current literature regarding orthopaedic extremity emergencies and urgencies. The effects of the techniques of damage control orthopaedic techniques and the concept of the orthopaedic trauma room have also affected the management of these injuries. The available literature indicates that the remaining true orthopaedic extremity emergencies include compartment syndrome and vascular injuries associated with fractures and dislocations. Orthopaedic urgencies include open fracture management, femoral neck fractures in young patients treated with open reduction and internal fixation, and talus fractures that are open or those with impending skin compromise. Deciding when the definitive management of orthopaedic extremity injuries will occur has evolved as the concept of damage control orthopaedics has become more commonly accepted. Patient survival rates have improved with current resuscitative protocols. Definitive fixation of extremity injuries should be delayed until the patient's physiologic and extremity soft-tissue status allows for appropriate definitive management while minimizing the risks of complications. In patients with semiurgent orthopaedic injuries, the use of an orthopaedic trauma room has led to more efficient care of patients, fewer complications, and better time management for surgeons who perform on-call service for patients with traumatic orthopaedic injuries.

  7. STS-127 Firing Room

    NASA Image and Video Library

    2009-07-11

    John P. Shannon, Manager, NASA Space Shuttle Program Office watches the latest weather radar in Firing Room Four of the Launch Control Center at NASA's Kennedy Space Center in Cape Canaveral, Florida, Sunday, July 12, 2009. Endeavour is set to launch at 7:13p.m. EDT with the crew of STS-127 and start a 16-day mission that will feature five spacewalks and complete construction of the Japan Aerospace Exploration Agency's Kibo laboratory. Photo Credit: (NASA/Bill Ingalls)

  8. Infection control in design and construction work.

    PubMed

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  9. [Management of an elderly patient in the emergency room at the end of life : A medical ethics challenge].

    PubMed

    Michels, G; Nies, R; Ortmann, S; Pfister, R; Salomon, F

    2018-04-01

    A 94-year-old patient with cardiogenic shock due to myocardial infarction was admitted via the emergency room. A coronary angiography and intensive care were requested. The need for care due to dementia was known. After case discussion in the interdisciplinary and multiprofessional treatment team, the decision for a palliative care concept in the form of symptom control was made in the emergency room, taking into account the patient's medical history, the current situation, and the presumed patient consent. The integration of medical ethics aspects and palliative medicine into "geriatric emergency medicine" will present a challenge in the future.

  10. [The "Würzburg T". A concept for optimization of early multiple trauma care in the emergency department].

    PubMed

    Kuhnigk, H; Steinhübel, B; Keil, T; Roewer, N

    2004-07-01

    Anaesthesia management, radiological diagnostic and the concept of damage control surgery should be combined in the resuscitation room. Defined clinical targets and their realisation are a CT-scan and complete damage control surgery in the shock room. Furthermore minimised patient transfer and positioning with continuous access to the head, upper parts of the body and anaesthesia machine should be realised during diagnostic procedures. Based on a carbon-slide fixed on a turntable and innovative alignment of diagnostic devices, a three phase treatment algorithm has been established. Phase A includes primary survey, anaesthetic management and ultrasound examination. Following a turn of the table conventional x-ray diagnostic is assessed in phase B. Tracks for the slide enable immediate transfer to a spiral CT-scan without additional patient positioning (phase C). Following complete CT-scan rearrangement of the table to phase A facilitates immediate damage control surgery. To accelerate device operation and treatment the integrated anaesthesia workstation is ceiling-mounted and manoeuvres close to the patient. This concept realizes complete diagnostic procedures and damage control surgery without time consuming patient transfer or rearrangement.

  11. [Crisis management in pediatric anesthesia].

    PubMed

    Takeuchi, Mamoru; Otsuka, Yoji; Taga, Naoyuki; Sato, Yuki; Iwai, Hidetaka; Okada, Osamu

    2009-05-01

    We describe the risk management of pediatric anesthesia. The most important risk management of pediatric anesthesia is airway and temperature management. Neonates and infants easily become hypoxic due to their insufficient functional residual capacity. Therefore airway management is most important not only during induction of anesthesia but also during maintenance of anesthesia and extubation. The management of patients' temperature, including control of room temperature should be taken into consideration. In addition, careful attention should be paid not to introduce air bubbles in any lines, especially in patients with congenital heart diseases.

  12. Cutaneous cooling to manage botulinum toxin injection-associated pain in patients with facial palsy: A randomised controlled trial.

    PubMed

    Pucks, N; Thomas, A; Hallam, M J; Venables, V; Neville, C; Nduka, C

    2015-12-01

    Botulinum toxin injections are an effective, well-established treatment to manage synkinesis secondary to chronic facial palsy, but they entail painful injections at multiple sites on the face up to four times per year. Cutaneous cooling has long been recognised to provide an analgesic effect for cutaneous procedures, but evidence to date has been anecdotal or weak. This randomised controlled trial aims to assess the analgesic efficacy of cutaneous cooling using a cold gel pack versus a room-temperature Control. The analgesic efficacy of a 1-min application of a Treatment cold (3-5 °C) gel pack versus a Control (room-temperature (20 °C)) gel pack prior to botulinum toxin injection into the platysma was assessed via visual analogue scale (VAS) ratings of pain before, during and after the procedure. Thirty-five patients received both trial arms during two separate clinic appointments. Cold gel packs provided a statistically significant reduction in pain compared with a room-temperature Control (from 26.4- to 10.2-mm VAS improvement (p < 0.001)), with no variance noted secondary to age, the hemi-facial side injected or the order in which the Treatment or Control gel packs were applied. Cryoanalgesia using a fridge-cooled gel pack provides an effective, safe and cheap method for reducing pain at the botulinum toxin injection site in patients with facial palsy. Copyright © 2015 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  13. 78 FR 32626 - Pacific Fishery Management Council (Pacific Council); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... Species Advisory 8 a.m Terrace A-D Room. Subpanel. Highly Migratory Species Management 8 a.m Terrace E-F... Royal E Room. Budget Committee 2 p.m Granada Room. Enforcement Consultants 5 p.m Royal D-F Room. Thursday, June 20, 2013: California State Delegation......... 7 a.m Royal E Room. Oregon State Delegation 7...

  14. Managing computer-controlled operations

    NASA Technical Reports Server (NTRS)

    Plowden, J. B.

    1985-01-01

    A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

  15. STS-3 MISSION OPERATIONS CONTROL ROOM (MOCR) - JSC

    NASA Image and Video Library

    1982-03-26

    Mission Control Activities during the STS-3 Mission, Day-4 with: Maj. Gen. James A. Abrahamson, Associate Administrator of the Space Transportation System (STS), NASA Hdqs., conversing with Dr. Kraft; Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC, Aaron Cohen, Manager, Space Shuttle Orbiter Project Office; and, J. E. Conner, Ford Aerospace Engineer at the Instrumentation and Communications Officer (INCO) Console position. 1. Glynn S. Lunney 2. Major General James A. Abrahamson 3. Aaron Cohen 4. J. E. Conner 5. Dr. Christopher Kraft JSC, Houston, TX

  16. [Management for the operating room].

    PubMed

    Tschudi, O; Schüpfer, G

    2015-03-01

    Business companies, which in the current times also includes hospitals, must create customer benefits and as a prerequisite for this must sustainably generate profits. Management in the world of business means the formation and directing of a company or parts of a company on a permanent basis, whereby management in this context is not exercising power but function. This concept of management is exemplary developed in this article for the important services sector of the operating room (OR) and individual functions, such as resource control, capacity planning and materials administration are presented in detail. Some OR-specific management challenges are worked out. From this it becomes clear that the economic logic of the most efficient implementation possible is not a contradiction of medical ethics, enabling the most effective treatment possible for patients while safeguarding the highest possible levels of safety and quality. The article aims to build a bridge for medical specialists to the language and world of commerce, emphasizing the profession-based competence and hopefully to arouse interest to go into more detail.

  17. A randomized controlled trial of the Arctic Sun Temperature Management System versus conventional methods for preventing hypothermia during off-pump cardiac surgery.

    PubMed

    Grocott, Hilary P; Mathew, Joseph P; Carver, Elizabeth H; Phillips-Bute, Barbara; Landolfo, Kevin P; Newman, Mark F

    2004-02-01

    In this trial we compared the hypothermia avoidance abilities of the Arctic Sun Temperature Management System (a servo-regulated system that circulates temperature-controlled water through unique energy transfer pads adherent to the patient's body) with conventional temperature control methods. Patients undergoing off-pump coronary artery bypass (OPCAB) surgery were randomized to either the Arctic Sun System alone (AS group) or conventional methods (control group; increased room temperature, heated IV fluids, convective forced air warming system) for the prevention of hypothermia (defined by a temperature <36 degrees C). The AS group had nasopharyngeal temperature servo-regulated to a target of 36.8 degrees C. Temperature was recorded throughout the operative period and comparisons were made between groups for both the time and area under the curve (AUC) for a temperature <36 degrees C (AUC<36 degrees C). Twenty-nine patients (AS group = 14, control group = 15) were studied. The AS group had significantly less hypothermia than the control group, both for duration of time <36 degrees C (2.5 [0-22] min, median [interquartile range] AS group versus 118 [49-192] min, control group; P = 0.0008) as well as for AUC<36 degrees C (0.3 [0-2.2] degrees C x min, AS group versus 17.1 [3.6-173.4] degrees C x min, control group; P = 0.002). The Arctic Sun Temperature Management System significantly reduced intraoperative hypothermia during OPCAB surgery. Importantly, this was achieved in the absence of any other temperature modulating techniques, including the use of IV fluid warming or increases in the ambient operating room temperature. The Arctic Sun Temperature Management System was more effective than conventional methods in preventing hypothermia during off-pump coronary artery bypass graft surgery.

  18. 75 FR 8750 - Submission for OMB Review: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Department of Labor--Employee Benefits Security Administration (EBSA), Office of Management and Budget, Room... information technology, e.g., permitting electronic submission of responses. Agency: Employee Benefits... of Collection: Annual Report for Multiple Employer Welfare Arrangements (Form M-1). OMB Control...

  19. Key facilitators and best practices of hotel-style room service in hospitals.

    PubMed

    Sheehan-Smith, Lisa

    2006-04-01

    This qualitative study sought to identify the features, advantages, and disadvantages of hotel-style room service; the barriers to, and facilitators for, implementing the process; and "best practices." The study took place in four heterogeneous hospitals. Participants included hospital administrators, managers, and room-service employees. Data-collection methods included semi-structured interviews, observations, and document analysis. Common features of hotel-style room service were meal delivery within 30 to 45 minutes, a restaurant-style menu, procedures to feed ineligible patients, tray assembly on demand, scripting, and waitstaff uniforms for room-service employees. The major barrier to implementing room service was obtaining nursing support. The key facilitators were the hospital's service-oriented culture, using a multidisciplinary planning team, engaging nursing departments early in the planning stages, and intense customer-service training of room-service employees. The overwhelming advantage was patients' control over their food choices. The main disadvantage was cost. Initial best practices in hotel-style room service include: (a) taking a multidisciplinary team approach for developing and implementing the process, (b) customer-service training, (c) using a customer-driven menu, (d) wearing waitstaff uniforms, and (e) using carts with airpots for dispensing hot beverages.

  20. [Does ultraclean air in the operating room provide greater safety?].

    PubMed

    van Tiel, Frank H; Buiting, Anton G; Meessen, Nico E L; Voss, Andreas; Vos, Margreet C

    2010-01-01

    The Dutch quality control plan for climatisation of the operating room (OR), which was published in 2005, describes the management and maintenance of the air conditioning system. This management plan proposes a standard for air quality in class 1 ORs. This has been adopted by the Dutch Orthopaedic Society, but not by other surgical societies. The British study which underlies the proposed norm for air quality in class 1 ORs, a study on the infection preventive effect of ultraclean air, dates from 1982 and is inadequately controlled for prophylactic use of antibiotics. Antibiotic prophylaxis in itself already reduces the number of surgical site infections.-More recent studies fail to show an infection preventive effect of ultraclean air in the OR. The Dutch Working Party for Infection Prevention (WIP) ought to take the initiative, together with the medical Scientific Societies and the Society of Infection Prevention and Control in the health care setting (VHIG), to establish enforceable norms for microbiological air quality and to set criteria as to which types of operations are allowed to be performed in which class of OR.

  1. DHM simulation in virtual environments: a case-study on control room design.

    PubMed

    Zamberlan, M; Santos, V; Streit, P; Oliveira, J; Cury, R; Negri, T; Pastura, F; Guimarães, C; Cid, G

    2012-01-01

    This paper will present the workflow developed for the application of serious games in the design of complex cooperative work settings. The project was based on ergonomic studies and development of a control room among participative design process. Our main concerns were the 3D human virtual representation acquired from 3D scanning, human interaction, workspace layout and equipment designed considering ergonomics standards. Using Unity3D platform to design the virtual environment, the virtual human model can be controlled by users on dynamic scenario in order to evaluate the new work settings and simulate work activities. The results obtained showed that this virtual technology can drastically change the design process by improving the level of interaction between final users and, managers and human factors team.

  2. Consultation, communication, and conflict management by out-of-operating room anesthesiologists: strangers in a strange land.

    PubMed

    Caplan, Jason P; Querques, John; Epstein, Lucy A; Stern, Theodore A

    2009-03-01

    With anesthesiology increasingly practiced outside the operating room (OR) environment, it is important that anesthesiologists begin to identify and to teach the communication skills required for practice in non-OR general hospital settings. The "one back" position of the consultant, and the associated diminished sense of immediate control, can generate discomfort for many clinicians. This article discusses the literature regarding practice as a consultant and the navigation of conflict with an emphasis on how anesthesiologists might apply the findings to out-of-OR practice.

  3. Launch of Space Shuttle Atlantis / STS-129 Mission

    NASA Image and Video Library

    2009-11-16

    STS129-S-054 (16 Nov. 2009) --- Michael Coats (left), director of NASA's Johnson Space Center in Houston; and Bob Cabana, director of NASA's Kennedy Space Center in Florida, monitor the progress of Space Shuttle Atlantis' countdown from consoles in the Operations Management Room, a glass partitioned area overlooking the main floor of Firing Room 4, in Kennedy's Launch Control Center. Liftoff of Atlantis from Launch Pad 39A on its STS-129 mission to the International Space Station came at 2:28 p.m. (EST) on Nov. 16, 2009.

  4. Room-temperature voltage tunable phonon thermal conductivity via reconfigurable interfaces in ferroelectric thin films.

    PubMed

    Ihlefeld, Jon F; Foley, Brian M; Scrymgeour, David A; Michael, Joseph R; McKenzie, Bonnie B; Medlin, Douglas L; Wallace, Margeaux; Trolier-McKinstry, Susan; Hopkins, Patrick E

    2015-03-11

    Dynamic control of thermal transport in solid-state systems is a transformative capability with the promise to propel technologies including phononic logic, thermal management, and energy harvesting. A solid-state solution to rapidly manipulate phonons has escaped the scientific community. We demonstrate active and reversible tuning of thermal conductivity by manipulating the nanoscale ferroelastic domain structure of a Pb(Zr0.3Ti0.7)O3 film with applied electric fields. With subsecond response times, the room-temperature thermal conductivity was modulated by 11%.

  5. Restaurant Training Recipe At Triton College

    ERIC Educational Resources Information Center

    Quagliano, Joseph

    1974-01-01

    The successful restaurant training program at Triton College (Illinois) involves a broadly based, two-year curriculum offering practical training in nearly all the areas associated with a comprehensive food operation--management, food preparation, menu planning, nutrition, personnel vending, dining room service, and cost control. (Author/EA)

  6. 75 FR 56972 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Factors AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice of...: Background There are roughly 170,000 miles of hazardous liquid pipelines, 295,000 miles of gas transmission...

  7. How To Organize Technology Areas.

    ERIC Educational Resources Information Center

    Fickes, Michael

    1998-01-01

    Highlights three ways a college or university can organize its technology areas to maximize comfort and save space. Examples are provided on controlling equipment sprawl through thoughtful workstation development, designing computer rooms for flexibility and effective cable management, and emulating business setups that are work-flow efficient and…

  8. Delivery room management of extremely low birth weight infants in Italy: comparison between academic and non-academic birth centres.

    PubMed

    Mardegan, Veronica; Satariano, Irene; Doglioni, Nicoletta; Criscoli, Giulio; Cavallin, Francesco; Gizzi, Camilla; Martano, Claudio; Ciralli, Fabrizio; Torielli, Flaminia; Villani, Paolo Ernesto; Di Fabio, Sandra; Quartulli, Lorenzo; Giannini, Luigi; Trevisanuto, Daniele

    2016-01-01

    International Guidelines provide a standardised approach to newborn resuscitation in the DR and, in their most recent versions, recommendations dedicated to management of ELBWI were progressively increased. It is expected that introduction in clinical practice and dissemination of the most recent evidence should be more consistent in academic than in non-academic hospitals. The aim of the study was to compare adherence to the International Guidelines and consistency of practice in delivery room management of extremely low birth weight infants between academic and non-academic institutions. A questionnaire was sent to the directors of all Italian level III centres between April and August 2012. There was a 92% (n = 98/107) response rate. Apart from polyethylene wrapping to optimise thermal control, perinatal management approach was comparable between academic and non-academic centres. There were minor differences in management of extremely low birth weight infants between Italian academic and non-academic institutions, apart from thermal management. Although there was a good, overall adherence to the International Guidelines for Neonatal Resuscitation, temperature management was not in accordance with official recommendations and every effort has to be done to improve this aspect.

  9. Assessing the compatibility of the management of standardized procedures with the complexity of a sociotechnical system: case study of a control room in an oil refinery.

    PubMed

    Saurin, Tarcisio Abreu; Gonzalez, Santiago Sosa

    2013-09-01

    Although the need for the management of complex socio-technical systems (STS) to be compatible with the nature of those systems is widely recognized, there are few guidelines on how to determine the actual extent of this compatibility. The purpose of this study is to assess how compatible the management of standardized procedures (SPs) is with the nature of a complex STS. To this end, a case study was made of a control room in an oil refinery, involving the following stages: (a) delimitation of the investigated STS; (b) description of the STS according to a set of characteristics of complex STS; (c) application of two types of questionnaires to thirty workers - one of them to assess their perceptions about the applicability of seven principles of SPs management in complex STS and the other to determine their perceptions about the actual use of these principles; and (d) a feedback meeting with workers to discuss the results of the assessment. The assessment is discussed in terms of its limitations, usefulness and ease of use of the data collection and analysis tools. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  10. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  11. KSC-00pp1244

    NASA Image and Video Library

    2000-09-06

    The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing

  12. KSC00pp1244

    NASA Image and Video Library

    2000-09-06

    The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing

  13. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  14. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  15. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  16. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  17. Prospective controlled evaluation of the effect of a community based asthma education centre in a multiracial working class neighbourhood.

    PubMed Central

    Garrett, J.; Fenwick, J. M.; Taylor, G.; Mitchell, E.; Stewart, J.; Rea, H.

    1994-01-01

    BACKGROUND--Previous work has indicated a high rate of non-attendance at hospital based clinics among young, multiracial asthmatic patients of lower socioeconomic class. The efficacy of delivering asthma education from a community health centre established in a multiracial working class neighbourhood was evaluated. METHODS--A prospective controlled study was performed in which asthmatic subjects aged between two and 55 years attending a hospital emergency room with acute asthma and living within a defined geographical area of high emergency room users were randomised to the usual follow up or the education centre plus usual follow up. Measurements were taken at entry into the study and again nine months later. RESULTS--At nine months patients randomised to the education centre had more preventive medications, more peak expiratory flow meters and better flow meter technique, more self-management plans, better knowledge of appropriate action to take when confronted with worsening asthma, less nocturnal awakening, and better self-reported asthma control than the control group. There was no difference between the study groups in measurements of compliance, hospital admission, days lost from school or work, or emergency room use. CONCLUSIONS--The main effects of education were on asthma knowledge and self-management skills, whilst improvements in asthma morbidity were small. Potential reasons for this include heterogeneous study population (in terms of baseline self-management skills, asthma severity, ethnicity and age), pragmatic study design, insensitivity of many of the measurements of morbidity, the modest effectiveness of a single time limited education programme, and inability to limit the effects of such a large community based study to the intervention group (there was a 67% reduction in asthma admissions during the study period from the geographical area targeted compared with a 22% reduction for the rest of Auckland). Images PMID:7974314

  18. Senator Doug Jones (D-AL) Tour of MSFC Facilities

    NASA Image and Video Library

    2018-02-22

    Senator Doug Jones (D-AL.) and wife, Louise, tour Marshall Space Flight facilities. Steve Doering, manager, Stages Element, Space Launch System (SLS) program at MSFC, also tour the Payload Operations Integration Center (POIC) where Marshall controllers oversee stowage requirements aboard the International Space Station (ISS) as well as scientific experiments. Different positions in the room are explained to Senator Jones by MSFC controller Beau Simpson.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garabedian, G.

    This document details the decontamination and decommissioning (D&D) process of Rooms 248 and 250 of Building 62 at the Ernest Orlando Lawrence Berkeley National Laboratory (LBNL). The document describes the D&D efforts for the rooms, their contents, and adjacent areas containing ancillary equipment. The rooms and equipment, before being released, were required to meet the unrestricted release criteria and requirements set forth in DOE orders 5400.5 and 5480.11, LBNL`s internal release-criteria procedure (EH&S Procedure 708), and the LBNL Radiological Control Manual. The radioactive material and items not meeting the release criteria were either sent to the Hazardous Waste Handling Facilitymore » (HWHF) for disposal or transferred to other locations approved for radioactive material. The D&D was undertaken by the Radiation Protection Group of LBNL`s Environment, Health and Safety (EH&S) Division at the request of the Materials Sciences Division. Current and past use of radioactive material in both Rooms 248 and 250 necessitated the D&D in order to release both rooms for nonradioactive work. (1) Room 248 was designated a {open_quotes}controlled area.{close_quotes} There was contained radioactive material in some of the equipment. The previous occupants of Room 248 had worked with radioactive materials. (2) Room 250 was designated a {open_quotes}Radioactive Materials Management Area{close_quotes} (RMMA) because the current occupants used potentially dispersible radioisotopes. Both laboratories, during the occupancy of U.C. Berkeley Professor Leo Brewer and Ms. Karen Krushwitz, were kept in excellent condition. There was a detailed inventory of all radioactive materials and chemicals. All work and self surveys were documented. The labs were kept extremely orderly, clean, and in compliance. In October 1993 Ms. Krushwitz received an award in recognition of her efforts in Environmental Protection, Health, and Safety at LBNL.« less

  20. INFLIGHT (MISSION CONTROL CENTER [MCC]) - STS-1 - ELLINGTON AFB (EAFB), TX

    NASA Image and Video Library

    1981-04-13

    S81-32876 (13 April 1981) --- Brig. Gen. William T. Twinting studies the monitor at the Department of Defense (DOD) console in the mission operations control room (MOCR) at the Johnson Space Center?s Mission Control Center (MCC). He is deputy DOD manager for Space Shuttle Support Operations. Gen. Twinting and the other flight controllers seen in the background listen as astronaut John W. Young, STS-1 commander, describes the scenery of a downlink TV transmission. Photo credit: NASA

  1. 31 CFR Appendix G to Subpart A of... - Financial Management Service

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Financial Management Service G...—Financial Management Service 1. In general. This appendix applies to the Financial Management Service. 2. Public reading room. The public reading room for the Financial Management Service is maintained at the...

  2. 76 FR 18652 - Revision to the Manual of Regulations and Procedures for Federal Radio Frequency Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Office of Spectrum Management, 1401 Constitution Avenue, NW., Room 1087, Washington, DC 20230. FOR... effect, is available in the Office of Spectrum Management, 1401 Constitution Avenue, NW., Room 1087...

  3. 75 FR 54790 - Revision to the Manual of Regulations and Procedures for Federal Radio Frequency Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Office of Spectrum Management, 1401 Constitution Avenue, NW., Room 1087, Washington, DC 20230. FOR... effect, is available in the Office of Spectrum Management, 1401 Constitution Avenue, NW., Room 1087...

  4. Causes and consequences of occupational stress in emergency nurses, a longitudinal study.

    PubMed

    Adriaenssens, Jef; De Gucht, Veronique; Maes, Stan

    2015-04-01

    This longitudinal study examines the influence of changes over time in work and organisational characteristics on job satisfaction, work engagement, emotional exhaustion, turnover intention and psychosomatic distress in emergency room nurses. Organisational and job characteristics of nurses are important predictors of stress-health outcomes. Emergency room nurses are particularly exposed to stressful work-related events and unpredictable work conditions. The study was carried out in 15 emergency departments of Belgian general hospitals in 2008 (T1) and 18 months later (T2) (n = 170). Turnover rates between T1 and T2 were high. Important changes over time were found in predictors and outcomes. Changes in job demand, control and social support predicted job satisfaction, work engagement and emotional exhaustion. In addition, changes in reward, social harassment and work agreements predicted work engagement, emotional exhaustion and intention to leave, respectively. Work-related interventions are important to improve occupational health in emergency room nurses and should focus on lowering job demands, increasing job control, improving social support and a well-balanced reward system. Nursing managers should be aware of the causes and consequences of occupational stress in emergency room nurses in order to enable preventive interventions. © 2013 John Wiley & Sons Ltd.

  5. Porting and refurbishment of the WSS TNG control software

    NASA Astrophysics Data System (ADS)

    Caproni, Alessandro; Zacchei, Andrea; Vuerli, Claudio; Pucillo, Mauro

    2004-09-01

    The Workstation Software Sytem (WSS) is the high level control software of the Italian Galileo Galilei Telescope settled in La Palma Canary Island developed at the beginning of '90 for HP-UX workstations. WSS may be seen as a middle layer software system that manages the communications between the real time systems (VME), different workstations and high level applications providing a uniform distributed environment. The project to port the control software from the HP workstation to Linux environment started at the end of 2001. It is aimed to refurbish the control software introducing some of the new software technologies and languages, available for free in the Linux operating system. The project was realized by gradually substituting each HP workstation with a Linux PC with the goal to avoid main changes in the original software running under HP-UX. Three main phases characterized the project: creation of a simulated control room with several Linux PCs running WSS (to check all the functionality); insertion in the simulated control room of some HPs (to check the mixed environment); substitution of HP workstation in the real control room. From a software point of view, the project introduces some new technologies, like multi-threading, and the possibility to develop high level WSS applications with almost every programming language that implements the Berkley sockets. A library to develop java applications has also been created and tested.

  6. An Integrated Systems Approach: A Description of an Automated Circulation Management System.

    ERIC Educational Resources Information Center

    Seifert, Jan E.; And Others

    These bidding specifications describe requirements for a turn-key automated circulation system for the University of Oklahoma Libraries. An integrated systems approach is planned, and requirements are presented for various subsystems: acquisitions, fund accounting, reserve room, and bibliographic and serials control. Also outlined are hardware…

  7. Managing Archival Collections in an Automated Environment: The Joys of Barcoding

    ERIC Educational Resources Information Center

    Hamburger, Susan; Charles, Jane Veronica

    2006-01-01

    In a desire for automated collection control, archival repositories are adopting barcoding from their library and records center colleagues. This article discusses the planning, design, and implementation phases of barcoding. The authors focus on reasons for barcoding, security benefits, in-room circulation tracking, potential for gathering…

  8. 76 FR 81983 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Cognitive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Statistics (BLS). Title of Collection: Cognitive and Psychological Research. OMB Control Number: 1220-0141... Department of Labor (DOL) is submitting the Bureau of Labor Statistics (BLS) sponsored information collection... Statistics (BLS), Office of Management and Budget, Room 10235, Washington, DC 20503, Telephone: (202) 395...

  9. 76 FR 5613 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Storage and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ...: The Department of Labor (DOL) hereby announces the submission of the Occupational Safety and Health... Health Administration (OSHA), Office of Management and Budget, Room 10235, Washington, DC 20503... Health Administration (OSHA). Title of Collection: Storage and Handling of Anhydrous Ammonia. OMB Control...

  10. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance activities and for emergency response. For transmission lines, the manual must also include... and effective manner. (5) Starting up and shutting down any part of the pipeline in a manner designed... control room management procedures required by § 192.631. (c) Abnormal operation. For transmission lines...

  11. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Constellation Program manager Jeff Hanley, Ares I-X Launch Director Ed Mango, Ares I-X mission manager Bob Ess, Ground Operations Manager Philip "Pepper" Phillips, review the latest data in Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  12. 77 FR 75567 - Revision to the Manual of Regulations and Procedures for Federal Radio Frequency Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Office of Spectrum Management, 1401 Constitution Avenue NW., Room 1087, Washington, DC 20230. FOR FURTHER... effect, is available in the Office of Spectrum Management, 1401 Constitution Avenue NW., Room 1087...

  13. Auditing Operating Room Recycling: A Management Case Report.

    PubMed

    McGain, Forbes; Jarosz, Katherine Maria; Nguyen, Martin Ngoc Hoai Huong; Bates, Samantha; O'Shea, Catherine Jane

    2015-08-01

    Much waste arises from operating rooms (ORs). We estimated the practical and financial feasibility of an OR recycling program, weighing all waste from 6 ORs in Melbourne, Australia. Over 1 week, 237 operations produced 1265 kg in total: general waste 570 kg (45%), infectious waste 410 kg (32%), and recyclables 285 kg (23%). The achieved recycling had no infectious contamination. The achieved recycling/potential recycling rate was 285 kg/517 kg (55%). The average waste disposal costs were similar for general waste and recycling. OR recycling rates of 20%-25% total waste were achievable without compromising infection control or financial constraints.

  14. STS-35 Mission Manager Actions Room at the Marshall Space Flight Center Spacelab Payload Operations

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The primary objective of the STS-35 mission was round the clock observation of the celestial sphere in ultraviolet and X-Ray astronomy with the Astro-1 observatory which consisted of four telescopes: the Hopkins Ultraviolet Telescope (HUT); the Wisconsin Ultraviolet Photo-Polarimeter Experiment (WUPPE); the Ultraviolet Imaging Telescope (UIT); and the Broad Band X-Ray Telescope (BBXRT). The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Teams of controllers and researchers directed on-orbit science operations, sent commands to the spacecraft, received data from experiments aboard the Space Shuttle, adjusted mission schedules to take advantage of unexpected science opportunities or unexpected results, and worked with crew members to resolve problems with their experiments. Due to loss of data used for pointing and operating the ultraviolet telescopes, MSFC ground teams were forced to aim the telescopes with fine tuning by the flight crew. This photo captures the activities at the Mission Manager Actions Room during the mission.

  15. Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Romberger, Jeff

    The HVAC Controls Evaluation Protocol is designed to address evaluation issues for direct digital controls/energy management systems/building automation systems (DDC/EMS/BAS) that are installed to control heating, ventilation, and air-conditioning (HVAC) equipment in commercial and institutional buildings. (This chapter refers to the DDC/EMS/BAS measure as HVAC controls.) This protocol may also be applicable to industrial facilities such as clean rooms and labs, which have either significant HVAC equipment or spaces requiring special environmental conditions.

  16. Display Sharing: An Alternative Paradigm

    NASA Technical Reports Server (NTRS)

    Brown, Michael A.

    2010-01-01

    The current Johnson Space Center (JSC) Mission Control Center (MCC) Video Transport System (VTS) provides flight controllers and management the ability to meld raw video from various sources with telemetry to improve situational awareness. However, maintaining a separate infrastructure for video delivery and integration of video content with data adds significant complexity and cost to the system. When considering alternative architectures for a VTS, the current system's ability to share specific computer displays in their entirety to other locations, such as large projector systems, flight control rooms, and back supporting rooms throughout the facilities and centers must be incorporated into any new architecture. Internet Protocol (IP)-based systems also support video delivery and integration. IP-based systems generally have an advantage in terms of cost and maintainability. Although IP-based systems are versatile, the task of sharing a computer display from one workstation to another can be time consuming for an end-user and inconvenient to administer at a system level. The objective of this paper is to present a prototype display sharing enterprise solution. Display sharing is a system which delivers image sharing across the LAN while simultaneously managing bandwidth, supporting encryption, enabling recovery and resynchronization following a loss of signal, and, minimizing latency. Additional critical elements will include image scaling support, multi -sharing, ease of initial integration and configuration, integration with desktop window managers, collaboration tools, host and recipient controls. This goal of this paper is to summarize the various elements of an IP-based display sharing system that can be used in today's control center environment.

  17. Anesthetic management for carbon dioxide laser surgery of the larynx.

    PubMed

    Shaker, M H; Konchigeri, H N; Andrews, A H; Holinger, P H

    1976-06-01

    Fifty-one patients underwent 71 carbon dioxide laser procedures under general anesthesia for various intralaryngeal pathology. Anesthesia was induced with thiopental sodium, followed by succinylcholine to facilitate endotracheal intubation. For maintenance of anesthesia, 70% nitrous oxide was supplemented with halothane, enflurane or small doses of fentanyl. Succinylcholine, d-tubocurare or pancuronium were used to maintain muscular relaxation of jaw, pharyngeal and laryngeal muscles for a smooth lasing procedure. Small diameter (16-22 Fr.), red rubber, cuffed endotracheal tubes provided maximum working space, facilitated the controlled ventilation and reduced the explosion hazard of the anesthetic gases. Safely eyeglasses were used by all the personnel in the operating room against accidental injury to the cornea by the laser beam. Anesthetic management provided excellent operative conditions with maximum safety to the patient and the personnel in the operating room.

  18. Human Factors Principles in Information Dashboard Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques V.; St. Germain, Shawn

    When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state conceptsmore » for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.« less

  19. 143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  20. 76 FR 10429 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    .... Department of Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140...: Bring comments to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at....regulations.gov at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground...

  1. 78 FR 25476 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Benzene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Department of Labor (DOL) will submit the Occupational Safety and Health Administration (OSHA) sponsored... Regulatory Affairs, Attn: OMB Desk Officer for DOL-OSHA, Office of Management and Budget, Room 10235, 725... submission of responses. Agency: DOL-OSHA. Title of Collection: Benzene Standard. OMB Control Number: 1218...

  2. 77 FR 36296 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Cadmium in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... Department of Labor (DOL) is submitting the Occupational Safety and Health Administration (OSHA) sponsored... Information and Regulatory Affairs, Attn: OMB Desk Officer for DOL-OSHA, Office of Management and Budget, Room... submission of responses. Agency: DOL-OSHA. Title of Collection: Cadmium in Construction Standard. OMB Control...

  3. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  4. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  5. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  6. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  7. Room Management in Mainstreamed/Integrated Classrooms. Item 5.

    ERIC Educational Resources Information Center

    Thomas, Gary

    1988-01-01

    (The paper reports on implications of classroom research for class management techniques especially in classes in which handicapped students are mainstreamed. Findings demonstrating a conflict between giving attention to individual children and keeping general engagement high are identified. Recommended room management (RM) procedures are reported…

  8. 78 FR 52508 - Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    .... Habitat Committee 8:30 a.m Liberty Room. Budget Committee 12 Noon Emerald Room. Legislative Committee 2 p.m Emerald Room. Enforcement Consultants 5 p.m Delamar Room. Thursday, September 12, 2013: California...

  9. FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L Boring; David I Gertman; Tuan Q Tran

    2008-09-01

    This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and riskmore » associated with human performance in next generation control rooms.« less

  10. [The endoscopic operating room OR 1].

    PubMed

    Dubuisson, J B; Chapron, C

    2003-04-01

    During the last few years, the development of surgical laparoscopy has been the major turning point, and the most important progress in the field of surgery. The specific installation requirements of surgical laparoscopy, as well as the technological progress proper to this surgical technique, justify the need of a new organization of the operating theatre. The new operating room OR 1 is especially designed to fit and satisfy the requirements of a modern operating theatre, where surgical laparoscopy plays a major role. The organization and the design of this new operating room (OR 1) rely on 2 main concepts: architectural, and computerized, through 2 PC systems SCB and AIDA. The main objectives of this new concept are: allowing the surgeon to control and command all the functions and the instruments, as well as the lighting of the room and the operating field; managing the surgical data and images required for medical files; establishing a communication network either from the inside or outside the sterile zone.

  11. 10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM INTERIOR, SHOWING ESCAPE HATCH. Looking north along east wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  12. 75 FR 32837 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140, Washington, DC 20590. Fax... Docket Management Facility in Room W12-140 of the West Building Ground Floor at 1200 New Jersey Avenue... at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at...

  13. 76 FR 45648 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140, Washington, DC 20590. Fax... comments to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at 1200 New... at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at...

  14. [OR-management and self-improvement - a discrepancy?].

    PubMed

    Casutt, Mattias; Konrad, Christoph; Schüpfer, Guido

    2014-10-01

    Today, operating room management is essential for a modern hospital. The strategic controls of this cost-intensive area and the ongoing cost pressure have necessitated management attention to this area. Economical, processual and quality data are well-known and established, although analysis of different health delivering organisations by benchmarking is still difficult. It remains still a severe task for the management of an OR and anaesthesia department. For these fields data is needed to identify and measure the performance of these departments in the dimensions of finances, development, processes and patient's needs. The key performance indicators are exemplified for an anaesthesia department and discussed. © Georg Thieme Verlag Stuttgart · New York.

  15. Damage Control for Vascular Trauma from the Prehospital to the Operating Room Setting.

    PubMed

    Pikoulis, Emmanouil; Salem, Karim M; Avgerinos, Efthymios D; Pikouli, Anastasia; Angelou, Anastasios; Pikoulis, Antreas; Georgopoulos, Sotirios; Karavokyros, Ioannis

    2017-01-01

    Early management of vascular injury, starting at the field, is imperative for survival no less than any operative maneuver. Contemporary prehospital management of vascular trauma, including appropriate fluid and volume infusion, tourniquets, and hemostatic agents, has reversed the historically known limb hemorrhage as a leading cause of death. In this context, damage control (DC) surgery has evolved to DC resuscitation (DCR) as an overarching concept that draws together preoperative and operative interventions aiming at rapidly reducing bleeding from vascular disruption, optimizing oxygenation, and clinical outcomes. This review addresses contemporary DCR techniques from the prehospital to the surgical setting, focusing on civilian vascular injuries.

  16. SIG -- The Role of Human-Computer Interaction in Next-Generation Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Jacques Hugo; Christian Richard

    2005-04-01

    The purpose of this CHI Special Interest Group (SIG) is to facilitate the convergence between human-computer interaction (HCI) and control room design. HCI researchers and practitioners actively need to infuse state-of-the-art interface technology into control rooms to meet usability, safety, and regulatory requirements. This SIG outlines potential HCI contributions to instrumentation and control (I&C) and automation in control rooms as well as to general control room design.

  17. Energy Systems Integration Facility Control Room | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees

  18. Locker Room Talk.

    ERIC Educational Resources Information Center

    Fickes, Michael

    1999-01-01

    Examines the trends in college and university sports and recreation center locker rooms as envisioned by a specialist. Features of the modern locker room and the different levels of locker room design are explained. Final comments discuss whether college and university facility managers are inclined to move to high-end locker rooms. (GR)

  19. 77 FR 40626 - RP9580.210, Personal Assistance Services in Shelters Fact Sheet

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Affairs Division, Office of Chief Counsel, Federal Emergency Management Agency, Room 835, 500 C Street SW... by mail Federal Emergency Management Agency, Public Assistance Division, Room 408-67, 500 C Street SW... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2012-0014...

  20. Classroom Management and the Socially Disadvantaged.

    ERIC Educational Resources Information Center

    Ogletree, Earl

    Because of their deficits in academic attainments and different cultural styles, socially disadvantaged children create more potential than other children for classroom management problems. To improve classroom management, teachers should maintain a clean room and train their students to enter that room in an orderly fashion. In dealing with their…

  1. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  2. [Present status of critical hemorrhage and its management in the operating room].

    PubMed

    Irita, Kazuo

    2014-12-01

    Hemorrhage is a major cause of cardiac arrest in the operating room. Many human factors, including surgical procedures, transfusion practices, blood supply, and anesthetic management, are involved in the process that leads to hemorrhage developing into a critical situation. It is desirable for hospital transfusion committees to prepare hospital-based regulations on 'actions to be taken to manage critical hemorrhage', and practice the implementation of these regulations with simulated drills. If intraoperative hemorrhage may become critical, a state of emergency should immediately be declared to the operating room staff, the blood transfusion service staff, and blood bank staff in order to organize a systematic approach to the ongoing problem and keep all responsible staff working outside the operating room informed of events developing in the room. To rapidly deal with critical hemorrhage, not only cooperation between anesthesiologists and surgeons but also linkage of operating rooms with blood transfusion services and a blood bank are important. When time is short, cross-matching tests are omitted, and ABO-identical red blood cells are used. When supplies of ABO-identical red blood cells are not available, ABO-compatible, non-identical red blood cells are used. Because a systematic, not individual, approach is required to prevent and manage critical hemorrhage, whether or not a hospital can establish a procedure to deal with it depends on the overall capability of critical and crisis management of the hospital. (Review).

  3. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Ares I-X Assistant Launch Director Pete Nickolenko, Ground Operations Manager Philip "Pepper" Phillips, Ares I-X Launch Director Ed Mango, and Constellation Program manager Jeff Hanley review the latest weather radar from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  4. Something Happens in Room 13: Bringing Truths into the World

    ERIC Educational Resources Information Center

    Grube, Vicky

    2015-01-01

    This qualitative study looks at how an art studio run by children in crisis impacts what we can learn about art and relationships. Room 13, an art studio on school grounds managed by children ages 7-11 years old, began in Scotland in the 1980's and is now worldwide. Room 13 young artists manage the studio, raise funds, and even hire an adult…

  5. 76 FR 16044 - Agency Information Collection (VAAR Clause 852.236.89, Buy American Act) Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... Clause 852.236.89, Buy American Act) Under OMB Review AGENCY: Office of Management, Department of... Branch, New Executive Office Building, Room 10235, Washington, DC 20503 (202) 395-7316. Please refer to... Regulation (VAAR) Clause 852.236-89, Buy American Act. OMB Control Number: 2900-0622. Type of Review...

  6. 75 FR 51485 - Comment Request for Information Collection for OMB Control No. 1205-0033; Job Corps Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... Employment and Training Administration is soliciting comments concerning the collection of data about Job... Health and Wellness Manager, Employment and Training Administration, Office of Job Corps, Room N-4507.... Background Job Corps is an intensive, residential training program for at-risk youth age 16 through 24 to...

  7. Racial comparisons of health care and glycemic control for African American and white diabetic adults in an urban managed care organization.

    PubMed

    Gary, Tiffany L; McGuire, Maura; McCauley, Jeanne; Brancati, Frederick L

    2004-01-01

    The excess risk of diabetic complications in African Americans may be due to poor glycemic control arising from suboptimal use and/or quality of diabetes-related health care. However, little is known about racial differences in these factors, particularly in urban populations. We conducted a cross-sectional study using medical claims and encounter data on 1,106 adults with diabetes aged > or =30 years who were members of an urban managed care organization in capitated health plans. We examined health care and routine hemoglobin A(1c) (HbA(1c)) testing in a biracial cohort for 12 months. We then followed individuals for an additional 12 months, using a retrospective cohort design, to determine how this health care predicted subsequent emergency room visits. On average, compared with their white counterparts, African Americans had fewer primary care visits (85% vs. 91% with four or more visits) and fewer HbA(1c) tests (56% vs. 68% with two or more HbA(1c) tests) (all P < 0.05). Likewise, in the subset who underwent one or more HbA(1c) measurement (n = 855), African Americans displayed poorer glycemic control (HbA(1c) 9.1 +/- 2.9%) than whites (8.5 +/- 2.2%; P = 0.001). In multivariate analyses, racial differences in visit frequency and HbA(1c) testing were attenuated by adjustment for age, sex, and type of capitated plan and did not remain statistically significant. The relationship of health care to subsequent emergency room visits differed by race; in African Americans, fewer primary care visits and HbA(1c) tests predicted greater risk of emergency room visits. Even in a capitated, managed care setting, urban African Americans with diabetes are less likely than their white counterparts to undergo routine primary care visits and laboratory testing and are more likely to have suboptimal glycemic control. Differences in age, sex, and insurance type seemed to explain some of the disparities. Future research should determine the individual contributions of physician, patient, and system factors to the racial disparities in health care.

  8. Mission Operations Control Room Activities during STS-2 mission

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Mission Operations Control Room (MOCR) activities during STS-2 mission. President Ronald Reagan is briefed by Dr. Christopher C. Kraft, Jr., JSC Director, who points toward the orbiter spotter on the projection plotter at the front of the MOCR (39499); President Reagan joking with STS-2 astronauts during space to ground conversation (39500); Mission Specialist/Astronaut Sally K. Ride communicates with the STS-2 crew from the spacecraft communicator console (39501); Charles R. Lewis, bronze team Flight Director, monitors activity from the STS-2 crew. He is seated at the flight director console in MOCR (39502); Eugene F. Kranz, Deputy Director of Flight Operations at JSC answers a question during a press conference on Nov. 13, 1981. He is flanked by Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC; and Dr. Christopher C. Kraft, Jr., Director of JSC (39503).

  9. 18. Topside facility, interior of facility manager's room, view towards ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Topside facility, interior of facility manager's room, view towards west. Lyon - Whiteman Air Force Base, Oscar O-1 Minuteman Missile Alert Facility, Southeast corner of Twelfth & Vendenberg Avenues, Knob Noster, Johnson County, MO

  10. 78 FR 35593 - Special Local Regulation; Christmas Boat Parade, San Juan Harbor; San Juan, PR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ...: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room... Coast Guard when it is received at the Docket Management Facility. We recommend that you include your... the line associated with this rulemaking. You may also visit the Docket Management Facility in Room...

  11. View of Mission Control Center during the Apollo 13 emergency return

    NASA Image and Video Library

    1970-04-16

    S70-35369 (16 April 1970) --- Discussion in the Mission Operations Control Room (MOCR) dealing with the Apollo 13 crewmen during their final day in space. From left to right are Glynn S. Lunney, Shift 4 flight director; Gerald D. Griffin, Shift 2 flight director; astronaut James A. McDivitt, manager, Apollo Spacecraft Program, MSC; Dr. Donald K. Slayton, director of Flight Crew Operations, MSC; and Dr. Willard R. Hawkins, M.D., Shift 1 flight surgeon.

  12. Association of a Surgical Task During Training With Team Skill Acquisition Among Surgical Residents: The Missing Piece in Multidisciplinary Team Training.

    PubMed

    Sparks, Jessica L; Crouch, Dustin L; Sobba, Kathryn; Evans, Douglas; Zhang, Jing; Johnson, James E; Saunders, Ian; Thomas, John; Bodin, Sarah; Tonidandel, Ashley; Carter, Jeff; Westcott, Carl; Martin, R Shayn; Hildreth, Amy

    2017-09-01

    The human patient simulators that are currently used in multidisciplinary operating room team training scenarios cannot simulate surgical tasks because they lack a realistic surgical anatomy. Thus, they eliminate the surgeon's primary task in the operating room. The surgical trainee is presented with a significant barrier when he or she attempts to suspend disbelief and engage in the scenario. To develop and test a simulation-based operating room team training strategy that challenges the communication abilities and teamwork competencies of surgeons while they are engaged in realistic operative maneuvers. This pre-post educational intervention pilot study compared the gains in teamwork skills for midlevel surgical residents at Wake Forest Baptist Medical Center after they participated in a standardized multidisciplinary team training scenario with 3 possible levels of surgical realism: (1) SimMan (Laerdal) (control group, no surgical anatomy); (2) "synthetic anatomy for surgical tasks" mannequin (medium-fidelity anatomy), and (3) a patient simulated by a deceased donor (high-fidelity anatomy). Participation in the simulation scenario and the subsequent debriefing. Teamwork competency was assessed using several instruments with extensive validity evidence, including the Nontechnical Skills assessment, the Trauma Management Skills scoring system, the Crisis Resource Management checklist, and a self-efficacy survey instrument. Participant satisfaction was assessed with a Likert-scale questionnaire. Scenario participants included midlevel surgical residents, anesthesia providers, scrub nurses, and circulating nurses. Statistical models showed that surgical residents exposed to medium-fidelity simulation (synthetic anatomy for surgical tasks) team training scenarios demonstrated greater gains in teamwork skills compared with control groups (SimMan) (Nontechnical Skills video score: 95% CI, 1.06-16.41; Trauma Management Skills video score: 95% CI, 0.61-2.90) and equivalent gains in teamwork skills compared with high-fidelity simulations (deceased donor) (Nontechnical Skills video score: 95% CI, -8.51 to 6.71; Trauma Management Skills video score: 95% CI, -1.70 to 0.49). Including a surgical task in operating room team training significantly enhanced the acquisition of teamwork skills among midlevel surgical residents. Incorporating relatively inexpensive, medium-fidelity synthetic anatomy in human patient simulators was as effective as using high-fidelity anatomies from deceased donors for promoting teamwork skills in this learning group.

  13. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  14. Analysis of collaborative communication for linguistic cues of cognitive load.

    PubMed

    Khawaja, M Asif; Chen, Fang; Marcus, Nadine

    2012-08-01

    Analyses of novel linguistic and grammatical features, extracted from transcribed speech of people working in a collaborative environment, were performed for cognitive load measurement Prior studies have attempted to assess users' cognitive load with several measures, but most of them are intrusive and disrupt normal task flow. An effective measurement of people's cognitive load can help improve their performance by deploying appropriate output and support strategies accordingly. The authors studied 33 members of bushfire management teams working collaboratively in computerized incident control rooms and involved in complex bushfire management tasks. The participants' communication was analyzed for some novel linguistic features as potential indices of cognitive load, which included sentence length, use of agreement and disagreement phrases, and use of personal pronouns, including both singular and plural pronoun types. Results showed users' different linguistic and grammatical patterns with various cognitive load levels. Specifically, with high load, people spoke more and used longer sentences, used more words that indicated disagreement with other team members, and exhibited increased use of plural personal pronouns and decreased use of singular pronouns. The article provides encouraging evidence for the use of linguistic and grammatical analysis for measuring users' cognitive load and proposes some novel features as cognitive load indices. The proposed approach may be applied to many data-intense and safety-critical task scenarios, such as emergency management departments, for example, bushfire or traffic incident management centers; air traffic control rooms; and call centers, where speech is used as part of everyday tasks.

  15. 76 FR 56984 - Revision to the Manual of Regulations and Procedures for Federal Radio Frequency Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Office of Spectrum Management, 1401 Constitution Avenue, NW., Room 1087, Washington, DC 20230. FOR... Avenue, NW., Room 1087, Washington, DC 20230, or call William Mitchell on (202) 482-8124, and available...

  16. Foundations for teaching surgeons to address the contributions of systems to operating room team conflict.

    PubMed

    Rogers, David A; Lingard, Lorelei; Boehler, Margaret L; Espin, Sherry; Schindler, Nancy; Klingensmith, Mary; Mellinger, John D

    2013-09-01

    Prior research has shown that surgeons who effectively manage operating room conflict engage in a problem-solving stage devoted to modifying systems that contribute to team conflict. The purpose of this study was to clarify how systems contributed to operating room team conflict and clarify what surgeons do to modify them. Focus groups of circulating nurses and surgeons were conducted at 5 academic medical centers. Narratives describing the contributions of systems to operating room conflict and behaviors used by surgeons to address those systems were analyzed using the constant comparative approach associated with a constructivist grounded theory approach. Operating room team conflict was affected by 4 systems-related factors: team features, procedural-specific staff training, equipment management systems, and the administrative leadership itself. Effective systems problem solving included advocating for change based on patient safety concerns. The results of this study provide clarity about how systems contribute to operating room conflict and what surgeons can do to effectively modify these systems. This information is foundational material for a conflict management educational program for surgeons. Copyright © 2013 Elsevier Inc. All rights reserved.

  17. Innovative Designs for the Smart ICU.

    PubMed

    Halpern, Neil A

    2014-03-01

    Successfully designing a new ICU requires clarity of vision and purpose and the recognition that the patient room is the core of the ICU experience for patients, staff, and visitors. The ICU can be conceptualized into three components: the patient room, central areas, and universal support services. Each patient room should be designed for single patient use and be similarly configured and equipped. The design of the room should focus upon functionality, ease of use, healing, safety, infection control, communications, and connectivity. All aspects of the room, including its infrastructure; zones for work, care, and visiting; environment, medical devices, and approaches to privacy; logistics; and waste management, are important elements in the design process. Since most medical devices used at the ICU bedside are really sophisticated computers, the ICU needs to be capable of supporting the full scope of medical informatics. The patient rooms, the central ICU areas (central stations, corridors, supply rooms, pharmacy, laboratory, staff lounge, visitor waiting room, on-call suite, conference rooms, and offices), and the universal support services (infection prevention, finishings and flooring, staff communications, signage and wayfinding, security, and fire and safety) work best when fully interwoven. This coordination helps establish efficient and safe patient throughput and care and fosters physical and social cohesiveness within the ICU. A balanced approach to centralized and decentralized monitoring and logistics also offers great flexibility. Synchronization of the universal support services in the ICU with the hospital's existing systems maintains unity of purpose and continuity across the enterprise and avoids unnecessary duplication of efforts. Copyright © 2014 The American College of Chest Physicians. Published by Elsevier Inc. All rights reserved.

  18. Room with a View: Ethical Encounters in Room 13

    ERIC Educational Resources Information Center

    Grube, Vicky

    2012-01-01

    In this article, the author describes ethical encounters in Room 13, a schoolroom where children made what they wanted, posed their own questions, and ran an art room like a small business. In Room 13 children had the responsibility to maintain all aspects of the art studio. Specific decisions fell to an annually elected management team, a small…

  19. Dental Hygienist-Led Chronic Disease Management System to Control Early Childhood Caries.

    PubMed

    Ng, Man Wai; Fida, Zameera

    2016-06-01

    Management of the complex chronic disease of early childhood caries requires a system of coordinated health care interventions which can be led by a dental hygienist and where patient self-care efforts are paramount. Even after receiving costly surgical treatment under general anesthesia in the operating room, many children develop new and recurrent caries after only 6-12 months, a sequela that can be prevented. This article describes the chronic disease management (CDM) of dental caries, a science-based approach that can prevent and control caries. In this article, we (1) introduce the concept of CDM of dental caries, (2) provide evidence that CDM improves oral health outcomes, and (3) propose a dental hygienist-led team-based oral health care approach to CDM. Although we will be describing the CDM approach for early childhood caries, CDM of caries is applicable in children, adolescents, and adults. Early childhood caries disease control requires meaningful engagement of patients and parents by the oral health care team to assist them with making behavioral changes in the unique context of their families and communities. The traditional dentist/hygienist/assistant model needs to evolve to a collaborative partnership between care providers and patients/families. This partnership will be focused on systematic risk assessment and behaviorally based management of the disease itself, with sensitivity toward the familial environment. Early pilot study results demonstrate reductions in the rates of new caries, dental pain, and referral to the operating room compared with baseline rates. Dental hygienists are the appropriate team members to lead this approach because of their expertise in behavior change and prevention. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.

  20. Pattern of parental acceptance of management techniques used in pediatric dentistry.

    PubMed

    Peretz, Benjamin; Kharouba, Johnny; Blumer, Sigalit

    2013-01-01

    To evaluate parents' acceptance of management techniques in Israeli pediatric dental clinics. Ninety parents who accompanied their children to three pediatric dental clinics provided information on selected parameters including their attitudes about management techniques. 68.9% of the parents preferred to stay in the treatment room. The most accepted technique was positive reinforcement (81.1%) followed by tell-show-do (TSD) (76.7%, with younger parents more accepting than older, p = 0.049). The least accepted techniques were restraint (1.1%) and voice control (7.8%, especially by parents with the highest dental anxiety, p = 0.002). Sedation was unacceptable by 15.6% of the parents: those with the lowest dental anxiety agreed to sedation significantly more than those with greater dental anxiety (p = 0.031). Parents preferred more positive approaches and management techniques that involve demonstrations geared for the child's level of understanding. Restraint and voice control were more strongly rejected than sedation.

  1. Current status of personnel and infrastructure resources for infection prevention and control programs in the Republic of Korea: A national survey.

    PubMed

    Yoon, Young Kyung; Lee, Sung Eun; Seo, Beom Sam; Kim, Hyeon Jeong; Kim, Jong Hun; Yang, Kyung Sook; Kim, Min Ja; Sohn, Jang Wook

    2016-11-01

    There is significant variability in personnel and infrastructural resources for infection prevention and control (IPC) among health care institutions. The aim of this study is to evaluate the current status of individual hospital-based IPC programs in the Republic of Korea (ROK). A multicenter cross-sectional survey of 100 hospitals participating in the national surveillance programs for multidrug-resistant organisms (MDROs) in the ROK was conducted in September 2015. The survey consisted of 140 standardized Web-based questionnaires. The survey response rate was 41.0%. The responding hospitals are largely organized with multibed rooms, with an insufficient numbers of single rooms. Employment status of infection specialists and hand hygiene resources were better in larger hospitals. The responding hospitals had 1 full-time infection control nurse per 400.3 ± 154.1 beds, with wide variations in training and experience. Facilities have great diversity in their approach to preventing MDROs. There appeared to be no difference in supplies consumption and protocols for IPC among the hospitals, stratified according to size. A greater availability of specialist personnel, single rooms, and a comprehensive IPC program, with the support of a policy-oriented management, is necessary to achieve effective IPC. Copyright © 2016 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  2. 75 FR 6818 - Revision to the Manual of Regulations and Procedures for Federal Radio Frequency Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-11

    ... available in the Office of Spectrum Management, 1401 Constitution Avenue, NW, Room 1087, Washington, DC... Avenue, NW, Room 1087, Washington, DC 20230, or call William Mitchell at (202) 482-8124, and available...

  3. Baseline Study Methodology for Future Phases of Research on Nuclear Power Plant Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann

    In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator

  4. Ciguatera Fish Poisoning: Treatment, Prevention and Management

    PubMed Central

    Friedman, Melissa A.; Fleming, Lora E.; Fernandez, Mercedes; Bienfang, Paul; Schrank, Kathleen; Dickey, Robert; Bottein, Marie-Yasmine; Backer, Lorraine; Ayyar, Ram; Weisman, Richard; Watkins, Sharon; Granade, Ray; Reich, Andrew

    2008-01-01

    Ciguatera Fish Poisoning (CFP) is the most frequently reported seafood-toxin illness in the world, and it causes substantial physical and functional impact. It produces a myriad of gastrointestinal, neurologic and/or cardiovascular symptoms which last days to weeks, or even months. Although there are reports of symptom amelioration with some interventions (e.g. IV mannitol), the appropriate treatment for CFP remains unclear to many physicians. We review the literature on the treatments for CFP, including randomized controlled studies and anecdotal reports. The article is intended to clarify treatment options, and provide information about management and prevention of CFP, for emergency room physicians, poison control information providers, other health care providers, and patients. PMID:19005579

  5. Ciguatera fish poisoning: treatment, prevention and management.

    PubMed

    Friedman, Melissa A; Fleming, Lora E; Fernandez, Mercedes; Bienfang, Paul; Schrank, Kathleen; Dickey, Robert; Bottein, Marie-Yasmine; Backer, Lorraine; Ayyar, Ram; Weisman, Richard; Watkins, Sharon; Granade, Ray; Reich, Andrew

    2008-01-01

    Ciguatera Fish Poisoning (CFP) is the most frequently reported seafood-toxin illness in the world, and it causes substantial physical and functional impact. It produces a myriad of gastrointestinal, neurologic and/or cardiovascular symptoms which last days to weeks, or even months. Although there are reports of symptom amelioration with some interventions (e.g. IV mannitol), the appropriate treatment for CFP remains unclear to many physicians. We review the literature on the treatments for CFP, including randomized controlled studies and anecdotal reports. The article is intended to clarify treatment options, and provide information about management and prevention of CFP, for emergency room physicians, poison control information providers, other health care providers, and patients.

  6. Development of an Innovative Interactive Virtual Classroom System for K-12 Education Using Google App Engine

    ERIC Educational Resources Information Center

    Mumba, Frackson; Zhu, Mengxia

    2013-01-01

    This paper presents a Simulation-based interactive Virtual ClassRoom web system (SVCR: www.vclasie.com) powered by the state-of-the-art cloud computing technology from Google SVCR integrates popular free open-source math, science and engineering simulations and provides functions such as secure user access control and management of courses,…

  7. Graphs as a Managerial Tool: A Case Study of Du Pont's Use of Graphs in the Early Twentieth Century.

    ERIC Educational Resources Information Center

    Yates, JoAnne

    1985-01-01

    Sketches the development of business graphs in America. Examines their early use at Du Pont and the origin of the chart room around 1920, an important factor in the executive control systems at Du Pont. Draws lessons from this case study for managers and teachers of business communication. (PD)

  8. Success of commonly used operating room management tools in reducing tardiness of first case of the day starts: evidence from German hospitals.

    PubMed

    Ernst, Christian; Szczesny, Andrea; Soderstrom, Naomi; Siegmund, Frank; Schleppers, Alexander

    2012-09-01

    One of the declared objectives of surgical suite management in Germany is to increase operating room (OR) efficiency by reducing tardiness of first case of the day starts. We analyzed whether the introduction of OR management tools by German hospitals in response to increasing economic pressure was successful in achieving this objective. The OR management tools we considered were the appointment of an OR manager and the development and adoption of a surgical suite governance document (OR charter). We hypothesized that tardiness of first case starts was less in ORs that have adopted one or both of these tools. Using representative 2005 survey data from 107 German anesthesiology departments, we used a Tobit model to estimate the effect of the introduction of an OR manager or OR charter on tardiness of first case starts, while controlling for hospital size and surgical suite complexity. Adoption reduced tardiness of first case starts by at least 7 minutes (mean reduction 15 minutes, 95% confidence interval (CI): 7-22 minutes, P < 0.001). Reductions in tardiness of first case starts figure prominently the objectives of surgical suite management in Germany. Our results suggest that the appointment of an OR manager or the adoption of an OR charter support this objective. For short-term decision making on the day of surgery, this reduction in tardiness may have economic implications, because it reduced overutilized OR time.

  9. Implementation of the Diabetes Practice Guideline in the Army Medical Department: Final Evaluation

    DTIC Science & Technology

    2005-01-01

    Diabetes Quality Improvement Project DRG Diagnosis-Related Group ER Emergency room FMP Family Member Prefix HBA1c Hemoglobin A1c HCSR Health-Care Service...glycemic control by assessing and managing glycosylated hemoglobin, reported as hemoglobin A1c ( HbA1c ) lev- els. Assess HbA1c levels relative to target...frequency involved in adjusting insulin dosages Increase in the percentage of noninsulin patients who fill prescribed medications to control HbA1c

  10. Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald

    2013-03-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator ismore » also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.« less

  11. 76 FR 27636 - Commerce Spectrum Management Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... DEPARTMENT OF COMMERCE National Telecommunications and Information Administration Commerce... Administration, U.S. Department of Commerce. ACTION: Notice of open meeting, room location change. SUMMARY: This notice announces a change in the room location of a public meeting of the Commerce Spectrum Management...

  12. A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Boring, Ronald; Joe, Jeffrey

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.« less

  13. The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

    NASA Technical Reports Server (NTRS)

    Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)

    2002-01-01

    NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

  14. 8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. OR.NET: multi-perspective qualitative evaluation of an integrated operating room based on IEEE 11073 SDC.

    PubMed

    Rockstroh, M; Franke, S; Hofer, M; Will, A; Kasparick, M; Andersen, B; Neumuth, T

    2017-08-01

    Clinical working environments have become very complex imposing many different tasks in diagnosis, medical treatment, and care procedures. During the German flagship project OR.NET, more than 50 partners developed technologies for an open integration of medical devices and IT systems in the operating room. The aim of the present work was to evaluate a large set of the proposed concepts from the perspectives of various stakeholders. The demonstration OR is focused on interventions from the head and neck surgery and was developed in close cooperation with surgeons and numerous colleagues of the project partners. The demonstration OR was qualitatively evaluated including technical as well as clinical aspects. In the evaluation, a questionnaire was used to obtain feedback from hospital operators. The clinical implications were covered by structured interviews with surgeons, anesthesiologists and OR staff. In the present work, we qualitatively evaluate a subset of the proposed concepts from the perspectives of various stakeholders. The feedback of the clinicians indicates that there is a need for a flexible data and control integration. The hospital operators stress the need for tools to simplify risk management in openly integrated operating rooms. The implementation of openly integrated operating rooms will positively affect the surgeons, the anesthesiologists, the surgical nursing staff, as well as the technical personnel and the hospital operators. The evaluation demonstrated the need for OR integration technologies and identified the missing tools to support risk management and approval as the main barriers for future installments.

  17. PBF Control Building (PER619). Interior of control room shows control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  18. Poster - 26: Electronic Waiting Room Management for a busy Cancer Centre

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kildea, John; Hijal, Tarek

    We describe an electronic waiting room management system that we have developed and deployed in our cancer centre. Our system connects with our electronic medical records systems, gathers data for a machine learning algorithm to predict future patient waiting times, and is integrated with a mobile phone app. The system has been in operation for over nine months and has led to reduced lines, calmer waiting rooms and overwhelming patient and staff satisfaction.

  19. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Joe, Jeffrey; Rice, Brandon

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.« less

  20. Can efficient supply management in the operating room save millions?

    PubMed

    Park, Kyung W; Dickerson, Cheryl

    2009-04-01

    Supply expenses occupy an ever-increasing portion of the expense budget in today's increasingly technologically complex operating rooms. Yet, little has been studied and published in the anesthesia literature. This review attempts to bring the topic of supply management to anesthesiologists, who play a significant role in operating room management. Little investigative work has been performed on supply management. Anecdotal reports suggest the benefits of a perpetual inventory system over a periodic inventory system. A perpetual inventory system uses utilization data to update inventory on hand continually and this information is linked to purchasing and restocking, whereas a periodic inventory system counts inventory at some regular intervals (such as annually) and uses average utilization to set par levels. On the basis of application of operational management concepts, ways of taking advantage of a perpetual inventory system to achieve savings in supply expenses are outlined. These include linking the operating room scheduling and supply order system, distributor-driven just-in-time delivery of case carts, continual updating of preference lists based on utilization patterns, increasing inventory turnovers, standardizing surgical practices, and vendor consignment of high unit-cost items such as implants. In addition, Lean principles of visual management and elimination of eight wastes may be applicable to supply management.

  1. Dangerous (toxic) atmospheres in UK wood pellet and wood chip fuel storage.

    PubMed

    Simpson, Andrew T; Hemingway, Michael A; Seymour, Cliff

    2016-09-01

    There is growing use of wood pellet and wood chip boilers in the UK. Elsewhere fatalities have been reported, caused by carbon monoxide poisoning following entry into wood pellet storage areas. The aim of this work was to obtain information on how safely these two fuels are being stored in the UK. Site visits were made to six small-scale boiler systems and one large-scale pellet warehouse, to assess storage practice, risk management systems and controls, user knowledge, and potential for exposure to dangerous atmospheres. Real time measurements were made of gases in the store rooms and during laboratory tests on pellets and chips. Volatile organic compounds (VOCs) emitted and the microbiological content of the fuel was also determined. Knowledge of the hazards associated with these fuels, including confined space entry, was found to be limited at the smaller sites, but greater at the large pellet warehouse. There has been limited risk communication between companies supplying and maintaining boilers, those manufacturing and supplying fuel, and users. Risk is controlled by restricting access to the store rooms with locked entries; some store rooms have warning signs and carbon monoxide alarms. Nevertheless, some store rooms are accessed for inspection and maintenance. Laboratory tests showed that potentially dangerous atmospheres of carbon monoxide and carbon dioxide, with depleted levels of oxygen may be generated by these fuels, but this was not observed at the sites visited. Unplanned ventilation within store rooms was thought to be reducing the build-up of dangerous atmospheres. Microbiological contamination was confined to wood chips.

  2. Dangerous (toxic) atmospheres in UK wood pellet and wood chip fuel storage

    PubMed Central

    Simpson, Andrew T.; Hemingway, Michael A.; Seymour, Cliff

    2016-01-01

    ABSTRACT There is growing use of wood pellet and wood chip boilers in the UK. Elsewhere fatalities have been reported, caused by carbon monoxide poisoning following entry into wood pellet storage areas. The aim of this work was to obtain information on how safely these two fuels are being stored in the UK. Site visits were made to six small-scale boiler systems and one large-scale pellet warehouse, to assess storage practice, risk management systems and controls, user knowledge, and potential for exposure to dangerous atmospheres. Real time measurements were made of gases in the store rooms and during laboratory tests on pellets and chips. Volatile organic compounds (VOCs) emitted and the microbiological content of the fuel was also determined. Knowledge of the hazards associated with these fuels, including confined space entry, was found to be limited at the smaller sites, but greater at the large pellet warehouse. There has been limited risk communication between companies supplying and maintaining boilers, those manufacturing and supplying fuel, and users. Risk is controlled by restricting access to the store rooms with locked entries; some store rooms have warning signs and carbon monoxide alarms. Nevertheless, some store rooms are accessed for inspection and maintenance. Laboratory tests showed that potentially dangerous atmospheres of carbon monoxide and carbon dioxide, with depleted levels of oxygen may be generated by these fuels, but this was not observed at the sites visited. Unplanned ventilation within store rooms was thought to be reducing the build-up of dangerous atmospheres. Microbiological contamination was confined to wood chips. PMID:27030057

  3. 6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. [Business organization theory: its potential use in the organization of the operating room].

    PubMed

    Bartz, H-J

    2005-07-01

    The paradigm of patient care in the German health system is changing. The introduction of German Diagnosis Related Groups (G-DRGs), a diagnosis-related coding system, has made process-oriented thinking increasingly important. The treatment process is viewed and managed as a whole from the admission to the discharge of the patient. The interfaces of departments and sectors are diminished. A main objective of these measures is to render patient care more cost efficient. Within the hospital, the operating room (OR) is the most expensive factor accounting for 25 - 50 % of the costs of a surgical patient and is also a bottleneck in the surgical patient care. Therefore, controlling of the perioperative treatment process is getting more and more important. Here, the business organisation theory can be a very useful tool. Especially the concepts of process organisation and process management can be applied to hospitals. Process-oriented thinking uncovers and solves typical organisational problems. Competences, responsibilities and tasks are reorganised by process orientation and the enterprise is gradually transformed to a process-oriented system. Process management includes objective-oriented controlling of the value chain of an enterprise with regard to quality, time, costs and customer satisfaction. The quality of the process is continuously improved using process-management techniques. The main advantage of process management is consistent customer orientation. Customer orientation means to be aware of the customer's needs at any time during the daily routine. The performance is therefore always directed towards current market requirements. This paper presents the basics of business organisation theory and to point out its potential use in the organisation of the OR.

  5. 77 FR 30022 - U.S. Extractive Industries Transparency Initiative Stakeholder Assessment Public Listening...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... of Ocean Energy Management, 3801 Centerpoint Drive, Suite 100, Anchorage, AK 99503-5820, tel. 907... Surface Mining Reclamation and Enforcement, Building 3, Parkway Center, Conference Room, 2nd Floor...:00 pm CDT, June 12, 2012, Bureau of Ocean Energy Management, 1201 Elmwood Park Boulevard, Room 135...

  6. Food Production, Management and Services: Service. Teacher Edition. Second Edition.

    ERIC Educational Resources Information Center

    Palan, Earl

    This food production, management, and services teacher guide contains nine units: (1) orientation; (2) types of service; (3) table settings; (4) dining room personnel; (5) dining room procedures; (6) side work; (7) guest/employee relationships; (8) sales techniques; and (9) safety and sanitation. Suggestions are included to increase reinforcement…

  7. 77 FR 65535 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... Islands (BSAI) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will be held November... NE., Building 4, Observer Training Room 1055 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team... Fishery Management Council; telephone: (907) 271-2809. SUPPLEMENTARY INFORMATION: The Plan Teams will...

  8. PBF Control Building (PER619). Interior of control room. Control console ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  9. Surgical management of early pregnancy failure: history, politics, and safe, cost-effective care.

    PubMed

    Harris, Lisa H; Dalton, Vanessa K; Johnson, Timothy R B

    2007-05-01

    Early pregnancy failure and induced abortion are often managed differently, even though safe uterine evacuation is the goal in both. Early pregnancy failure is commonly treated by curettage in operating room settings in anesthetized patients. Induced abortion is most commonly managed by office vacuum aspiration in awake or sedated patients. Medical evidence does not support routine operating room management of early pregnancy failure. This commentary reviews historical origins of these different care standards, explores political factors responsible for their perpetuation, and uses experience at University of Michigan to dramatize the ways in which history, politics, and biomedicine intersect to produce patient care. The University of Michigan initiated office uterine evacuations for early pregnancy failure treatment. Patients previously went to the operating room. These changes required faculty, staff, and resident education. Our efforts blurred the lines between spontaneous and induced abortion management, improved patient care and better utilized hospital resources.

  10. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

  11. KSC-2012-6402

    NASA Image and Video Library

    2012-11-16

    CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  12. KSC-2012-6401

    NASA Image and Video Library

    2012-11-16

    CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  13. How do strategic decisions and operative practices affect operating room productivity?

    PubMed

    Peltokorpi, Antti

    2011-12-01

    Surgical operating rooms are cost-intensive parts of health service production. Managing operating units efficiently is essential when hospitals and healthcare systems aim to maximize health outcomes with limited resources. Previous research about operating room management has focused on studying the effect of management practices and decisions on efficiency by utilizing mainly modeling approach or before-after analysis in single hospital case. The purpose of this research is to analyze the synergic effect of strategic decisions and operative management practices on operating room productivity and to use a multiple case study method enabling statistical hypothesis testing with empirical data. 11 hypotheses that propose connections between the use of strategic and operative practices and productivity were tested in a multi-hospital study that included 26 units. The results indicate that operative practices, such as personnel management, case scheduling and performance measurement, affect productivity more remarkably than do strategic decisions that relate to, e.g., units' size, scope or academic status. Units with different strategic positions should apply different operative practices: Focused hospital units benefit most from sophisticated case scheduling and parallel processing whereas central and ambulatory units should apply flexible working hours, incentives and multi-skilled personnel. Operating units should be more active in applying management practices which are adequate for their strategic orientation.

  14. A Web-Based Operating Room Management Educational Tool.

    PubMed

    Tsai, Mitchell H; Haddad, Daniel J; Friend, Alexander F; Bender, S Patrick; Davidson, Melissa L

    2016-08-01

    In 2010, our department instituted a nonclinical, administrative rotation in operating room management for anesthesiology residents. Subsequently, we mandated the rotation for all senior anesthesiology residents in 2013. In 2014, under the auspices of the American Society of Anesthesiologists, we developed a web-based module covering the basics of finance, accounting, and operating room management. A multiple-choice test was given to residents at the beginning and end of the rotation, and we compared the mean scores between residents who took the traditional course and residents who took the web-based module. We found no significant difference between the groups of residents, suggesting that the web-based module is as effective as traditional didactics.

  15. Bio-Kil, a nano-based disinfectant, reduces environmental bacterial burden and multidrug-resistant organisms in intensive care units.

    PubMed

    Lee, Wen-Sen; Hsieh, Tai-Chin; Shiau, Justine C; Ou, Tsong-Yih; Chen, Fu-Lun; Liu, Yu-Hsin; Yen, Muh-Yong; Hsueh, Po-Ren

    2017-10-01

    This prospective before-after study was intended to investigate the effect of Bio-Kil on reducing environmental bacterial burden and healthcare-associated infections (HAIs) in intensive care units (ICUs) at the Municipal Wan-Fang Hospital, Taipei, Taiwan in 2014. Four rooms in the medical and surgical ICUs were investigated and designated as study rooms (n = 2) or control rooms (n = 2). Routine disinfection was performed during the pre-intervention period in both room types. Bio-Kil was applied to the fomites and surroundings of the study rooms during the intervention period. Total bacterial burden and proportion of colonization of fomites and surroundings by multidrug-resistance organisms (MDROs) were determined before and after the intervention. The demographic characteristics, underlying conditions, and clinical outcomes of patients were analyzed. After application of Bio-Kil, the bacterial burden declined in both groups, although the reduction was greater in the study rooms as compared with the control rooms (p = 0.001). During the pre-intervention period, 16 patients were admitted to control rooms and 18 patients to study rooms. After the intervention, 22 patients were admitted to control rooms and 21 patients to study rooms. The number of cases of new-onset sepsis declined in the intervention group (from 33% to 23.8%), but increased in the control group (from 25% to 40.9%); however, there was no significant difference in incidence of new-onset sepsis between the study and control rooms after intervention. Application of Bio-Kil reduced the environmental bacterial burden and MDROs in ICUs. Further studies are needed to evaluate the efficacy of this nanotechnology-based disinfectant in reducing HAIs. Copyright © 2016. Published by Elsevier B.V.

  16. Dense Tracking and Mapping with a Quadrocopter

    NASA Astrophysics Data System (ADS)

    Sturm, J.; Bylow, E.; Kerl, C.; Kahl, F.; Cremers, D.

    2013-08-01

    In this paper, we present an approach for acquiring textured 3D models of room-sized indoor spaces using a quadrocopter. Such room models are for example useful for architects and interior designers as well as for factory planners and construction managers. The model is internally represented by a signed distance function (SDF) and the SDF is used to directly track the camera with respect to the model. Our solution enables accurate position control of the quadrocopter, so that it can automatically follow a pre-defined flight pattern. Our system provides live feedback of the acquired 3D model to the user. The final model consisting of a textured 3D triangle mesh can be saved in several standard CAD file formats.

  17. 76 FR 76772 - Submission for Review: Standard Form 1153: Claim for Unpaid Compensation of Deceased Civilian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... and request for comments. SUMMARY: Merit System Audit and Compliance, Office of Personnel Management... Management, Merit System Audit and Compliance, Room 6484, 1900 E Street NW., Washington, DC 20415, or sent... instructions if more room is needed to list designated beneficiaries. Analysis Agency: Merit System Audit and...

  18. 78 FR 65292 - North Pacific Fishery Management Council (NPFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ..., 7600 Sand Point Way NE., Building 4, Observer Training Room 1055 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team), Seattle, WA. Council address: North Pacific Fishery Management Council, 605 W. 4th... Sea/Aleutian Islands (BSAI) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will...

  19. Application of an Online Reference for Reviewing Basic Statistical Principles of Operating Room Management

    ERIC Educational Resources Information Center

    Dexter, Franklin; Masursky, Danielle; Wachtel, Ruth E.; Nussmeier, Nancy A.

    2010-01-01

    Operating room (OR) management differs from clinical anesthesia in that statistical literacy is needed daily to make good decisions. Two of the authors teach a course in operations research for surgical services to anesthesiologists, anesthesia residents, OR nursing directors, hospital administration students, and analysts to provide them with the…

  20. 41 CFR 102-80.140 - What is meant by “room of origin”?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL MANAGEMENT Accident and Fire Prevention Room of Origin § 102-80.140 What is meant by “room of origin”? Room of origin means an area of a building where a fire can be expected to start. Typically, the..., this could lead to unacceptably large areas in the case of open plan office space or similar...

  1. 41 CFR 102-80.140 - What is meant by “room of origin”?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL MANAGEMENT Accident and Fire Prevention Room of Origin § 102-80.140 What is meant by “room of origin”? Room of origin means an area of a building where a fire can be expected to start. Typically, the..., this could lead to unacceptably large areas in the case of open plan office space or similar...

  2. 41 CFR 102-80.140 - What is meant by “room of origin”?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENVIRONMENTAL MANAGEMENT Accident and Fire Prevention Room of Origin § 102-80.140 What is meant by “room of origin”? Room of origin means an area of a building where a fire can be expected to start. Typically, the..., this could lead to unacceptably large areas in the case of open plan office space or similar...

  3. 41 CFR 102-80.140 - What is meant by “room of origin”?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENVIRONMENTAL MANAGEMENT Accident and Fire Prevention Room of Origin § 102-80.140 What is meant by “room of origin”? Room of origin means an area of a building where a fire can be expected to start. Typically, the..., this could lead to unacceptably large areas in the case of open plan office space or similar...

  4. 41 CFR 102-80.140 - What is meant by “room of origin”?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ENVIRONMENTAL MANAGEMENT Accident and Fire Prevention Room of Origin § 102-80.140 What is meant by “room of origin”? Room of origin means an area of a building where a fire can be expected to start. Typically, the..., this could lead to unacceptably large areas in the case of open plan office space or similar...

  5. Energy Efficiency in Small Server Rooms: Field Surveys and Findings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheung, Iris; Greenberg, Steve; Mahdavi, Roozbeh

    Fifty-seven percent of US servers are housed in server closets, server rooms, and localized data centers, in what are commonly referred to as small server rooms, which comprise 99percent of all server spaces in the US. While many mid-tier and enterprise-class data centers are owned by large corporations that consider energy efficiency a goal to minimize business operating costs, small server rooms typically are not similarly motivated. They are characterized by decentralized ownership and management and come in many configurations, which creates a unique set of efficiency challenges. To develop energy efficiency strategies for these spaces, we surveyed 30 smallmore » server rooms across eight institutions, and selected four of them for detailed assessments. The four rooms had Power Usage Effectiveness (PUE) values ranging from 1.5 to 2.1. Energy saving opportunities ranged from no- to low-cost measures such as raising cooling set points and better airflow management, to more involved but cost-effective measures including server consolidation and virtualization, and dedicated cooling with economizers. We found that inefficiencies mainly resulted from organizational rather than technical issues. Because of the inherent space and resource limitations, the most effective measure is to operate servers through energy-efficient cloud-based services or well-managed larger data centers, rather than server rooms. Backup power requirement, and IT and cooling efficiency should be evaluated to minimize energy waste in the server space. Utility programs are instrumental in raising awareness and spreading technical knowledge on server operation, and the implementation of energy efficiency measures in small server rooms.« less

  6. Walk-in clinics versus physician offices and emergency rooms for urgent care and chronic disease management.

    PubMed

    Chen, Connie E; Chen, Christopher T; Hu, Jia; Mehrotra, Ateev

    2017-02-17

    Walk-in clinics are growing in popularity around the world as a substitute for traditional medical care delivered in physician offices and emergency rooms, but their clinical efficacy is unclear. To assess the quality of care and patient satisfaction of walk-in clinics compared to that of traditional physician offices and emergency rooms for people who present with basic medical complaints for either acute or chronic issues. We searched CENTRAL, MEDLINE, Embase, six other databases, and two trials registers on 22 March 2016 together with reference checking, citation searching, and contact with study authors to identify additional studies. We applied no restrictions on language, publication type, or publication year. Study design: randomized trials, non-randomized trials, and controlled before-after studies. standalone physical clinics not requiring advance appointments or registration, that provided basic medical care without expectation of follow-up. Comparisons: traditional primary care practices or emergency rooms. We used standard methodological procedures expected by Cochrane and the Cochrane Effective Practice and Organisation of Care (EPOC) Group. The literature search identified 6587 citations, of which we considered 65 to be potentially relevant. We reviewed the abstracts of all 65 potentially relevant studies and retrieved the full texts of 12 articles thought to fit our study criteria. However, following independent author assessment of the full texts, we excluded all 12 articles. Controlled trial evidence about the mortality, morbidity, quality of care, and patient satisfaction of walk-in clinics is currently not available.

  7. Enlisted or Officer Drone Pilots

    DTIC Science & Technology

    2010-04-01

    begin to emerge. While both sets of pilots begrudge their video game status, the disparagement affects the warrior Army more than it affects the...missions, and will continue to replace today’s manned aircraft. The video game stigma of drones is largely irrelevant in the Air Force. Except for...drone control room is getting shot at, drones require military managers more than heroes. The video game stigma of drones has a greater significance

  8. Proceedings of the Human Factors Society 35th annual meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-01-01

    These volumes cover the proceedings of the 35th annual meeting of the Human Factors Society. Topics include: designing for the future of nuclear power plants international perspectives on advanced control room design; human performance assessment in the nuclear power industry; validity of strength tests for predicting endurance of coal miners, psychosocial issues in hazard management and nuclear power plants; and human factors at the DOE's national laboratories.

  9. Radon exposures in a Jerusalem public school.

    PubMed Central

    Richter, E D; Neeman, E; Fischer, I; Berdugo, M; Westin, J B; Kleinstern, J; Margaliot, M

    1997-01-01

    In December 1995, ambient radon levels exceeding 10,000 Bq/m3 were measured in a basement shelter workroom of a multilevel East Talpiot, Jerusalem, public elementary school (six grades, 600 students). The measurements were taken after cancers (breast and multiple myeloma) were diagnosed in two workers who spent their workdays in basement rooms. The school was located on a hill that geologic maps show to be rich in phosphate deposits, which are a recognized source for radon gas and its daughter products. Levels exceeding 1000,000 Bq/m3 were measured at the mouth of a pipe in the basement shelter workroom, the major point of radon entry. The school was closed and charcoal and electret ion chamber detectors were used to carry out repeated 5-day measurements in all rooms in the multilevel building over a period of several months. Radon concentrations were generally higher in rooms in the four levels of the building that were below ground level. There were some ground-level rooms in the building in which levels reached up to 1300 Bq/m3. In rooms above ground level, however, peak levels did not exceed 300 Bq/m3. Exposure control based on sealing and positive pressure ventilation was inadequate. These findings suggested that radon diffused from highly contaminated basement and ground-floor rooms to other areas of the building and that sealing off the source may have led to reaccumulation of radon beneath the building. Later, subslab venting of below-ground radon pockets to the outside air was followed by more sustained reductions in indoor radon levels to levels below 75 Bq/m3. Even so, radon accumulated in certain rooms when the building was closed. This sentinel episode called attention to the need for a national radon policy requiring threshold exposure levels for response and control. A uniform nationwide standard for school buildings below 75 Bq/m3 level was suggested after considering prudent avoidance, the controversies over risk assessment of prolonged low-level exposures in children, and the fact that exposures in most locations in the Talpiot school could be reduced below this level. Proposal of this stringent standard stimulated the search for a strategy of risk control and management based on control at the source. This strategy was more effective and probably more cost effective than one based on suppression of exposure based on sealing and ventilation. Because many Israeli areas and much of the West Bank area of the Palestinian National Authority sit on the same phosphate deposits, regional joint projects for surveillance and control may be indicated. Images Figure 1. Figure 2. PMID:9467053

  10. Patient portal doldrums: does an exam room promotional video during an office visit increase patient portal registrations and portal use?

    PubMed

    North, Frederick; Hanna, Barbara K; Crane, Sarah J; Smith, Steven A; Tulledge-Scheitel, Sidna M; Stroebel, Robert J

    2011-12-01

    The patient portal is a web service which allows patients to view their electronic health record, communicate online with their care teams, and manage healthcare appointments and medications. Despite advantages of the patient portal, registrations for portal use have often been slow. Using a secure video system on our existing exam room electronic health record displays during regular office visits, the authors showed patients a video which promoted use of the patient portal. The authors compared portal registrations and portal use following the video to providing a paper instruction sheet and to a control (no additional portal promotion). From the 12,050 office appointments examined, portal registrations within 45 days of the appointment were 11.7%, 7.1%, and 2.5% for video, paper instructions, and control respectively (p<0.0001). Within 6 months following the interventions, 3.5% in the video cohort, 1.2% in the paper, and 0.75% of the control patients demonstrated portal use by initiating portal messages to their providers (p<0.0001).

  11. Hotel smoking policies and their implementation: a survey of California hotel managers.

    PubMed

    Zakarian, Joy M; Quintana, Penelope J E; Winston, Carl H; Matt, Georg E

    2017-01-01

    Most states in the U.S. permit hotels to allow smoking in some guest rooms, and only five (Indiana, Michigan, North Dakota, Vermont, and Wisconsin) require that all hotel and motel rooms be 100% smoke-free (State and local 100% smokefree hotel and motel guest room laws enacted as of July 3, 2017). Little is known, however, about how hotels' smoking policies have been implemented. This study examined hotels' smoking policies and their implementation. A telephone survey of a random sample of 383 California hotel managers was conducted. Overall, 60.6% of hotels reported that smoking was prohibited in all guest rooms, and 4.7% reported that smoking was prohibited everywhere on their property. While California law permitted smoking in up to 65% of guest rooms, only 6.9% of rooms were reported as smoking-permitted. Over 90% of hotels had smoking rooms scattered among nonsmoking rooms, and about half of the smoking hotels reported that guests requesting either smoking or nonsmoking rooms were sometimes assigned to the other room type. When guests smoked in nonsmoking rooms fees could be substantial, but were often uncollected. Hotel smoking policies and their implementation fall short of protecting nonsmoking guests and workers from exposure to secondhand and thirdhand smoke. Complete indoor smoking bans for all hotels are needed to close existing loopholes. Nonsmokers who wish to protect themselves from exposure to tobacco smoke should avoid hotels that permit smoking and instead stay in completely smoke-free hotels.

  12. Establishment of lactaton rooms in public and private companies: potentialities and difficulties.

    PubMed

    Fernandes, Vanessa Martinhago Borges; Santos, Evanguelia Kotzias Atherino Dos; Erdmann, Alacoque Lorenzini; Pires, Denise Elvira Pires de; Zampieri, Maria de Fátima Mota; Gregório, Vitória Regina Petters

    2017-06-05

    To know how managers of public and private companies view lactation support rooms and their implantation. This is study is based on qualitative, exploratory, and descriptive research. Twenty managers from Greater Florianópolis participated in the research, in 2015. Data were collected by means of semi-structured/projective interviews, and subjected to content analysis associated with Atlas.ti software. Data analysis led to the following two categories: difficulties and facilities of establishing a lactation room, with a predominance of financial difficulties and the lack of physical space. Dialectically, the subjects also recognised the low cost involved, which facilitates establishment. Financial, cultural, and political aspects make it difficult to set up lactation rooms, but the importance of this measure was acknowledged. Although the success of breastfeeding partly depends on these support rooms, it also requires multiple actions, especially the effective participation of nurses and other health workers.

  13. 77 FR 51521 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    .../Aleutian Islands (BS/AI) groundfish plan teams will meet in Seattle, WA. DATES: The meetings will begin at... Marine Mammal Lab Room 2039 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team), Seattle, WA. Council... for 2013/14. The teams also will review status reports on various management actions, review the draft...

  14. Asthma-related health services and asthma control among women in Puerto Rico.

    PubMed

    Ortiz-Rivera, María Calixta

    2018-01-01

    This study evaluates social, behavioral, and environmental determinants to differentiate between active and inactive asthma and how predisposing, enabling, and need factors elucidate asthma-related health services and asthma control among women in Puerto Rico. This study analyzed secondary cross-sectional data from a subsample of 625 adult females who participated in the Asthma Call Back Survey in Puerto Rico. Logistic and multinomial regression analyses were conducted to examine associations between explanatory variables and asthma outcomes. In total, 63% of women reported active asthma, from which 37.9% have not well controlled or very poorly controlled asthma. Women with active asthma were significantly more likely to be out of work, have middle income (US$25,000-

  15. Situation-Dependent Medical Device Risk Estimation: Design and Evaluation of an Equipment Management Center For Vendor-Independent Integrated Operating Rooms.

    PubMed

    Maktabi, Marianne; Neumuth, Thomas

    2017-12-22

    The complexity of surgical interventions and the number of technologies involved are constantly rising. Hospital staff has to learn how to handle new medical devices efficiently. However, if medical device-related incidents occur, the patient treatment is delayed. Patient safety could therefore be supported by an optimized assistance system that helps improve the management of technical equipment by nonmedical hospital staff. We developed a system for the optimal monitoring of networked medical device activity and maintenance requirements, which works in conjunction with a vendor-independent integrated operating room and an accurate surgical intervention Time And Resource Management System. An integrated situation-dependent risk assessment system gives the medical engineers optimal awareness of the medical devices in the operating room. A qualitative and quantitative survey among ten medical engineers from three different hospitals was performed to evaluate the approach. A series of 25 questions was used to evaluate various aspects of our system as well as the system currently used. Moreover, the respondents were asked to perform five tasks related to system supervision and incident handling. Our system received a very positive feedback. The evaluation studies showed that the integration of information, the structured presentation of information, and the assistance modules provide valuable support to medical engineers. An automated operating room monitoring system with an integrated risk assessment and Time And Resource Management System module is a new way to assist the staff being outside of a vendor-independent integrated operating room, who are nevertheless involved in processes in the operating room.

  16. Main Control Room, view to the east. The door to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main Control Room, view to the east. The door to the motor room is to the right, and the main control cabinets are to the left - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  17. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  18. Air cleaning technologies: an evidence-based analysis.

    PubMed

    2005-01-01

    This health technology policy assessment will answer the following questions: When should in-room air cleaners be used?How effective are in-room air cleaners?Are in-room air cleaners that use combined HEPA and UVGI air cleaning technology more effective than those that use HEPA filtration alone?What is the Plasmacluster ion air purifier in the pandemic influenza preparation plan?The experience of severe acute respiratory syndrome (SARS) locally, nationally, and internationally underscored the importance of administrative, environmental, and personal protective infection control measures in health care facilities. In the aftermath of the SARS crisis, there was a need for a clearer understanding of Ontario's capacity to manage suspected or confirmed cases of airborne infectious diseases. In so doing, the Walker Commission thought that more attention should be paid to the potential use of new technologies such as in-room air cleaning units. It recommended that the Medical Advisory Secretariat of the Ontario Ministry of Health and Long-Term Care evaluate the appropriate use and effectiveness of such new technologies. Accordingly, the Ontario Health Technology Advisory Committee asked the Medical Advisory Secretariat to review the literature on the effectiveness and utility of in-room air cleaners that use high-efficiency particle air (HEPA) filters and ultraviolet germicidal irradiation (UVGI) air cleaning technology. Additionally, the Ontario Health Technology Advisory Committee prioritized a request from the ministry's Emergency Management Unit to investigate the possible role of the Plasmacluster ion air purifier manufactured by Sharp Electronics Corporation, in the pandemic influenza preparation plan. Airborne transmission of infectious diseases depends in part on the concentration of breathable infectious pathogens (germs) in room air. Infection control is achieved by a combination of administrative, engineering, and personal protection methods. Engineering methods that are usually carried out by the building's heating, ventilation, and air conditioning (HVAC) system function to prevent the spread of airborne infectious pathogens by diluting (dilution ventilation) and removing (exhaust ventilation) contaminated air from a room, controlling the direction of airflow and the air flow patterns in a building. However, general wear and tear over time may compromise the HVAC system's effectiveness to maintain adequate indoor air quality. Likewise, economic issues may curtail the completion of necessary renovations to increase its effectiveness. Therefore, when exposure to airborne infectious pathogens is a risk, the use of an in-room air cleaner to reduce the concentration of airborne pathogens and prevent the spread of airborne infectious diseases has been proposed as an alternative to renovating a HVAC system. Airborne transmission is the spread of infectious pathogens over large distances through the air. Infectious pathogens, which may include fungi, bacteria, and viruses, vary in size and can be dispersed into the air in drops of moisture after coughing or sneezing. Small drops of moisture carrying infectious pathogens are called droplet nuclei. Droplet nuclei are about 1 to 5μm in diameter. This small size in part allows them to remain suspended in the air for several hours and be carried by air currents over considerable distances. Large drops of moisture carrying infectious pathogens are called droplets. Droplets being larger than droplet nuclei, travel shorter distances (about 1 metre) before rapidly falling out of the air to the ground. Because droplet nuclei remain airborne for longer periods than do droplets, they are more amenable to engineering infection control methods than are droplets. Droplet nuclei are responsible for the airborne transmission of infectious diseases such as tuberculosis, chicken pox (varicella), measles (rubeola), and dessiminated herpes zoster, whereas close contact is required for the direct transmission of infectious diseases transmitted by droplets, such as influenza (the flu) and SARS. In-room air cleaners are supplied as portable or fixed devices. Fixed devices can be attached to either a wall or ceiling and are preferred over portable units because they have a greater degree of reliability (if installed properly) for achieving adequate room air mixing and airflow patterns, which are important for optimal effectiveness. Through a method of air recirculation, an in-room air cleaner can be used to increase room ventilation rates and if used to exhaust air out of the room it can create a negative-pressure room for airborne infection isolation (AII) when the building's HVAC system cannot do so. A negative-pressure room is one where clean air flows into the room but contaminated air does not flow out of it. Contaminated room air is pulled into the in-room air cleaner and cleaned by passing through a series of filters, which remove the airborne infectious pathogens. The cleaned air is either recirculated into the room or exhausted outside the building. By filtering contaminated room air and then recirculating the cleaned air into the room, an in-room air cleaner can improve the room's ventilation. By exhausting the filtered air to the outside the unit can create a negative-pressure room. There are many types of in-room air cleaners. They vary widely in the airflow rates through the unit, the type of air cleaning technology used, and the technical design. Crucial to maximizing the efficiency of any in-room air cleaner is its strategic placement and set-up within a room, which should be done in consultation with ventilation engineers, infection control experts, and/or industrial hygienists. A poorly positioned air cleaner may disrupt airflow patterns within the room and through the air cleaner, thereby compromising its air cleaning efficiency. The effectiveness of an in-room air cleaner to remove airborne pathogens from room air depends on several factors, including the airflow rate through the unit's filter and the airflow patterns in the room. Tested under a variety of conditions, in-room air cleaners, including portable or ceiling mounted units with either a HEPA or a non-HEPA filter, portable units with UVGI lights only, or ceiling mounted units with combined HEPA filtration and UVGI lights, have been estimated to be between 30% and 90%, 99% and 12% and 80% effective, respectively. However, and although their effectiveness is variable, the United States Centers for Disease Control and Prevention has acknowledged in-room air cleaners as alternative technology for increasing room ventilation when this cannot be achieved by the building's HVAC system with preference given to fixed recirculating systems over portable ones. Importantly, the use of an in-room air cleaner does not preclude either the need for health care workers and visitors to use personal protective equipment (N95 mask or equivalent) when entering AII rooms or health care facilities from meeting current regulatory requirements for airflow rates (ventilation rates) in buildings and airflow differentials for effective negative-pressure rooms. The Plasmacluster ion technology, developed in 2000, is an air purification technology. Its manufacturer, Sharp Electronics Corporation, says that it can disable airborne microorganisms through the generation of both positive and negative ions. (1) The functional unit is the hydroxyl, which is a molecule comprised of one oxygen molecule and one hydrogen atom. Plasmacluster ion air purifier uses a multilayer filter system composed of a prefilter, a carbon filter, an antibacterial filter, and a HEPA filter, combined with an ion generator to purify the air. The ion generator uses an alternating plasma discharge to split water molecules into positively and negatively charged ions. When these ions are emitted into the air, they are surrounded by water molecules and form cluster ions which are attracted to airborne particles. The cluster ion surrounds the airborne particle, and the positive and negative ions react to form hydroxyls. These hydroxyls steal the airborne particle's hydrogen atom, which creates a hole in the particle's outer protein membrane, thereby rendering it inactive. Because influenza is primarily acquired by large droplets and direct and indirect contact with an infectious person, any in-room air cleaner will have little benefit in controlling and preventing its spread. Therefore, there is no role for the Plasmacluster ion air purifier or any other in-room air cleaner in the control of the spread of influenza. Accordingly, for purposes of this review, the Medical Advisory Secretariat presents no further analysis of the Plasmacluster. The objective of the systematic review was to determine the effectiveness of in-room air cleaners with built in UVGI lights and HEPA filtration compared with those using HEPA filtration only. The Medical Advisory Secretariat searched the databases of MEDLINE, EMBASE, Cochrane Database of Systematic Reviews, INAHATA (International Network of Agencies for Health Technology Assessment), Biosis Previews, Bacteriology Abstracts, Web of Science, Dissertation Abstracts, and NIOSHTIC 2. A meta-analysis was conducted if adequate data was available from 2 or more studies and where statistical and clinical heterogeneity among studies was not an issue. Otherwise, a qualitative review was completed. The GRADE system was used to summarize the quality of the body of evidence comprised of 1 or more studies. There were no existing health technology assessments on air cleaning technology located during the literature review. The literature search yielded 59 citations of which none were retained. (ABSTRACT TRUNCATED)

  19. Educational Gaming for Pharmacy Students - Design and Evaluation of a Diabetes-themed Escape Room.

    PubMed

    Eukel, Heidi N; Frenzel, Jeanne E; Cernusca, Dan

    2017-09-01

    Objective. To design an educational game that will increase third-year professional pharmacy students' knowledge of diabetes mellitus disease management and to evaluate their perceived value of the game. Methods. Faculty members created an innovative educational game, the diabetes escape room. An authentic escape room gaming environment was established through the use of a locked room, an escape time limit, and game rules within which student teams completed complex puzzles focused on diabetes disease management. To evaluate the impact, students completed a pre-test and post-test to measure the knowledge they've gained and a perception survey to identify moderating factors that could help instructors improve the game's effectiveness and utility. Results. Students showed statistically significant increases in knowledge after completion of the game. A one-sample t -test indicated that students' mean perception was statistically significantly higher than the mean value of the evaluation scale. This statically significant result proved that this gaming act offers a potential instructional benefit beyond its novelty. Conclusion. The diabetes escape room proved to be a valuable educational game that increased students' knowledge of diabetes mellitus disease management and showed a positive perceived overall value by student participants.

  20. Inflight - Apollo XI (Mission Control Center [MCC]) - MSC

    NASA Image and Video Library

    1969-07-24

    S69-40302 (24 July 1969) --- A group of NASA and Manned Spacecraft Center (MSC) officials join in with the flight controllers in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, in celebrating the successful conclusion of the Apollo 11 lunar landing mission. From left foreground are Dr. Maxime A. Faget, MSC Director of Engineering and Development; George S. Trimble, MSC Deputy Director; Dr. Christopher C. Kraft Jr., MSC Director of Flight Operations; Julian Scheer (in back), Assistant Administrator, Office of Public Affairs, NASA Headquarters; George M. Low, Manager, Apollo Spacecraft Program, MSC; Dr. Robert R. Gilruth, MSC Director; and Charles W. Mathews, Deputy Associate Administrator, Office of Manned Space Flight, NASA Headquarters.

  1. Investigation of the impact of main control room digitalization on operators cognitive reliability in nuclear power plants.

    PubMed

    Zhou, Yong; Mu, Haiying; Jiang, Jianjun; Zhang, Li

    2012-01-01

    Currently, there is a trend in nuclear power plants (NPPs) toward introducing digital and computer technologies into main control rooms (MCRs). Safe generation of electric power in NPPs requires reliable performance of cognitive tasks such as fault detection, diagnosis, and response planning. The digitalization of MCRs has dramatically changed the whole operating environment, and the ways operators interact with the plant systems. If the design and implementation of the digital technology is incompatible with operators' cognitive characteristics, it may have negative effects on operators' cognitive reliability. Firstly, on the basis of three essential prerequisites for successful cognitive tasks, a causal model is constructed to reveal the typical human performance issues arising from digitalization. The cognitive mechanisms which they impact cognitive reliability are analyzed in detail. Then, Bayesian inference is used to quantify and prioritize the influences of these factors. It suggests that interface management and unbalanced workload distribution have more significant impacts on operators' cognitive reliability.

  2. Maximum performance synergy: A new approach to recording studio control room design

    NASA Astrophysics Data System (ADS)

    Szymanski, Jeff D.

    2003-10-01

    Popular recording studio control room designs include LEDE(tm), RFZ(tm), and nonenvironment rooms. The common goal of all of these is to create an accurate acoustical environment that does not distort or otherwise color audio reproduction. Also common to these designs is the frequent need to have multiple ancillary recording rooms, often adjacent to the main control room, where group members perform. This approach, where group members are physically separated from one another, can lead to lack of ensemble in the finished recordings. New twists on old acoustical treatment techniques have been implemented at a studio in Nashville, Tennessee, which minimize the need for multiple ancillary recording rooms, thus creating an environment where talent, producer and recording professionals can all occupy the same space for maximum performance synergy. Semi-separated performance areas are designed around a central, critical listening area. The techniques and equipment required to achieve this separation are reviewed, as are advantages and disadvantages to this new control room design approach.

  3. Reduced mortality: the unexpected impact of a telephone-based care management intervention for older adults in managed care.

    PubMed

    Alkema, Gretchen E; Wilber, Kathleen H; Shannon, George R; Allen, Douglas

    2007-08-01

    This analysis evaluated mortality over 24 months for Medicare managed care members who participated in the Care Advocate Program (CA Program) designed to link those with high health care utilization to home- and community-based services. Secondary data from the CA Program, part of the California HealthCare Foundation's Elders in Managed Care Initiative. Randomized-control trial in which participants (N=781) were randomly assigned to intent-to-treat (ITT) and control groups. ITT group received telephonic social care management and 12 months of follow-up. Various multivariate analyses were used to evaluate mortality risk throughout multiple study periods controlling for sociodemographic characteristics, health status, and health care utilization. Older adults (65+) enrolled in a Medicare managed care plan who had high health care utilization in the previous year. ITT group had a significantly lower odds of mortality throughout the study (OR=0.55; p=.005) and during the care management intervention (OR=0.45; p=.006), whereas differential risk in the postintervention period was not statistically significant. Other significant predictors of mortality were age, gender, three chronic conditions (cancer, heart disease, and kidney disease), and emergency room utilization. Findings suggest that the care advocate model of social care management affected mortality while the program was in progress, but not after completion of the intervention phase. Key model elements accounted for the findings, which include individualized targeting, assessment, and monitoring; consumer choice, control, and participant self-management; and bridging medical and social service delivery systems through direct linkages and communication.

  4. Use of a "secure room" and a security guard in the management of the violent, aggressive or suicidal patient in a rural hospital: a 3-year audit.

    PubMed

    Brock, Gordon; Gurekas, Vydas; Gelinas, Anne-Fredrique; Rollin, Karina

    2009-01-01

    Little has been published on the management of psychiatric crises in rural areas, and little is known of the security needs or use of "secure rooms" in rural hospitals. We conducted a 3-year retrospective chart audit on the use of our secure room/security guard system at a rural hospital in a town of 3500, located 220 km from our psychiatric referral centre. Use of our secure room/security guard system occurred at the rate of 1.1 uses/1000 emergency department visits, with the most common indication being physician perception of risk of patient suicide or self-harm. Concern for staff safety was a factor in 10% of uses. Eighty percent of patients were treated locally, with most being released from the secure room after 2 days or less. Fourteen percent of patients required ultimate transfer to our psychiatric referral centre and 6% to a detoxification centre. The average annual cost of security was $16 259.61. A secure room can provide the opportunity for close observation of a potentially self-harming patient, additional security for staff and early warning if a patient flees the hospital. Most admissions were handled locally, obviating the need for transfer to distant psychiatric referral centres. Most patients who were admitted were already known as having a psychiatric illness and 80% of the patients required the use of the secure room/security guard system for less than a 2-night stay, suggesting that most rural mental health crises pass quickly. Most patients admitted to a rural hospital with a mental health crisis can be managed locally if an adequate secure room/security guard system is available.

  5. 5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1A, DIRECTORATE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1-A, DIRECTORATE OF MISSILE CAPTIVE TEST, EDWARDS AFB, 15 JAN 58, 3097.58." Two men working in the control room. Photo no. "3097 58; G-AFFTC 15 JAN 58, T.S. 1-A Control". - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  6. 75 FR 13707 - Safety Zones; Annual Events Requiring Safety Zones in the Captain of the Port Lake Michigan Zone

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ...: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room... the ``Keyword'' box. Click ``Search'' then click on the balloon shape in the ``Actions'' column. If... also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of...

  7. Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jesica; Dees, Ray; Fratello, David

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  8. Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jessica R.; Dees, Ray A.; Fratello, David J.

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  9. Don't break the chain: importance of supply chain management in the operating room setting.

    PubMed

    Bilyk, Candis

    2008-09-01

    Management of supplies within the operating room (OR) has considerable implications for decreasing healthcare costs while maintaining high-quality patient care. This area of healthcare therefore requires more monitoring by end-users including OR management, physicians, and nursing staff. This article is based on understanding supply chain management in the OR setting. Information provided throughout the article can be applied to small or large health care centers. It defines supply chain management and contains a brief overview of supply chain processes. It reviews the benefits of following these processes. The article also includes recommendations for improving the supply chain in the OR.

  10. Development of efficiency indicators of operating room management for multi-institutional comparisons.

    PubMed

    Tanaka, Masayuki; Lee, Jason; Ikai, Hiroshi; Imanaka, Yuichi

    2013-04-01

    The efficiency of a hospital's operating room (OR) management can affect its overall profitability. However, existing indicators that assess OR management efficiency do not take into account differences in hospital size, manpower and functional characteristics, thereby rendering them unsuitable for multi-institutional comparisons. The aim of this study was to develop indicators of OR management efficiency that would take into account differences in hospital size and manpower, which may then be applied to multi-institutional comparisons. Using administrative data from 224 hospitals in Japan from 2008 to 2010, we performed four multiple linear regression analyses at the hospital level, in which the dependent variables were the number of operations per OR per month, procedural fees per OR per month, total utilization times per OR per month and total fees per OR per month for each of the models. The expected values of these four indicators were produced using multiple regression analysis results, adjusting for differences in hospital size and manpower, which are beyond the control of process owners' management. However, more than half of the variations in three of these four indicators were shown to be explained by differences in hospital size and manpower. Using the ratio of observed to expected values (OE ratio), as well as the difference between the two values (OE difference) allows hospitals to identify weaknesses in efficiency with more validity when compared to unadjusted indicators. The new indicators may support the improvement and sustainment of a high-quality health care system. © 2012 Blackwell Publishing Ltd.

  11. Main control room, showing original sixpane windows and doors to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main control room, showing original six-pane windows and doors to pump motor room at left. The main control cabinets and switchgear, visible on right, were replaced in 2003. View to the south - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  12. VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. THESE PANELS WERE WHERE THE A-MOTOR TAPES WOULD HAVE BEEN VISIBLE IN THE CONTROL ROOM. MORE RECENT MONITOR IN UPPER CENTER FOR “LTR FLUX MONITORS” - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  13. [Design and Implementation of a Mobile Operating Room Information Management System Based on Electronic Medical Record].

    PubMed

    Liu, Baozhen; Liu, Zhiguo; Wang, Xianwen

    2015-06-01

    A mobile operating room information management system with electronic medical record (EMR) is designed to improve work efficiency and to enhance the patient information sharing. In the operating room, this system acquires the information from various medical devices through the Client/Server (C/S) pattern, and automatically generates XML-based EMR. Outside the operating room, this system provides information access service by using the Browser/Server (B/S) pattern. Software test shows that this system can correctly collect medical information from equipment and clearly display the real-time waveform. By achieving surgery records with higher quality and sharing the information among mobile medical units, this system can effectively reduce doctors' workload and promote the information construction of the field hospital.

  14. Time to first take-back operation predicts successful primary fascial closure in patients undergoing damage control laparotomy.

    PubMed

    Pommerening, Matthew J; DuBose, Joseph J; Zielinski, Martin D; Phelan, Herb A; Scalea, Thomas M; Inaba, Kenji; Velmahos, George C; Whelan, James F; Wade, Charles E; Holcomb, John B; Cotton, Bryan A

    2014-08-01

    Failure to achieve primary fascial closure (PFC) after damage control laparotomy is costly and carries great morbidity. We hypothesized that time from the initial laparotomy to the first take-back operation would be predictive of successful PFC. Trauma patients managed with open abdominal techniques after damage control laparotomy were prospectively followed at 14 Level 1 trauma centers during a 2-year period. Time to the first take-back was evaluated as a predictor of PFC using hierarchical multivariate logistic regression analysis. A total of 499 patients underwent damage control laparotomy and were included in this analysis. PFC was achieved in 327 (65.5%) patients. Median time to the first take-back operation was 36 hours (interquartile range 24-48). After we adjusted for patient demographics, resuscitation volumes, and operative characteristics, increasing time to the first take-back was associated with a decreased likelihood of PFC. Specifically, each hour delay in return to the operating room (24 hours after initial laparotomy) was associated with a 1.1% decrease in the odds of PFC (odds ratio 0.989; 95% confidence interval 0.978-0.999; P = .045). In addition, there was a trend towards increased intra-abdominal complications in patients returning after 48 hours (odds ratio 1.80; 95% confidence interval 1.00-3.25; P = .05). Data from this prospective, multicenter study demonstrate that delays in returning to the operating room after damage control laparotomy are associated with reductions in PFC. These findings suggest that emphasis should be placed on returning to the operating room within 24 hours after the initial laparotomy if possible (and no later than 48 hours). Copyright © 2014 Mosby, Inc. All rights reserved.

  15. 75 FR 80041 - Pacific Fishery Management Council; Public Meetings and Hearings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... 7 p.m. at the following locations: March 28, 2011: Chateau Westport, Beach Room, 710 W Hancock, Westport, WA 98595, telephone: (360) 268-9101. March 28, 2011: Red Lion Hotel, Umpqua Room, 1313 N Bayshore Drive, Coos Bay, OR 97420, telephone: (541) 267-4141. March 29, 2011: Red Lion Eureka, Evergreen Room...

  16. 76 FR 78904 - Pacific Fishery Management Council; Public Meetings and Hearings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ...: March 26, 2012: Chateau Westport, Beach Room, 710 W Hancock, Westport, WA 98595, telephone: (360) 268-9101. March 26, 2012: Red Lion Hotel, Umpqua Room, 1313 N Bayshore Drive, Coos Bay, OR 97420, telephone: (541) 267-4141. March 27, 2012: Red Lion Eureka, Evergreen Room, 1929 Fourth Street, Eureka, CA 95501...

  17. 77 FR 48552 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... room numbers. FOR FURTHER INFORMATION CONTACT: Lisette Voyatzis, Committee Management Officer, 1100...: September 6, 2012. Time: 8:30 a.m. to 5:00 p.m. Room: 415. This meeting will discuss applications for the... Access. 2. Date: September 6, 2012. Time: 8:30 a.m. to 5:00 p.m. Room: 421. This meeting will discuss...

  18. KSC-2014-1973

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  19. Role of Adult Asthma Education in Improving Asthma Control and Reducing Emergency Room Utilization and Hospital Admissions in an Inner City Hospital

    PubMed Central

    Mishra, Rashmi; Venkatram, Sindhaghatta; George, Teresa; Luo, Kristina; Diaz-Fuentes, Gilda

    2017-01-01

    Objective. Asthma education programs have been shown to decrease healthcare utilization and improve disease control and management. The purpose of our study was to evaluate the impact of an outpatient adult asthma education program in an inner city hospital caring for patients with low socioeconomic and educational status. Methods. An asthma education program was implemented in September 2014. Patients who received education from September 2014 to July 2015 were evaluated. Outcomes were compared for the same group of patients before and after education. Primary outcomes were emergency room (ER) visits and hospital admissions. Secondary outcomes were change in Asthma Control Test (ACT) score and number of pulmonary clinic visits. Results. Asthma education significantly decreased number of patients requiring ER visits and hospital admissions (p = 0.0005 and p = 0.0015, resp.). Asthma control as per ACT score ≥ 20 improved with education (p = 0.0001) with an increase in clinic visits (p = 0.0185). Conclusions. Our study suggests that implementation of a structured asthma education program in an inner city community hospital has a positive impact on reduction of ER visits and hospital admissions with improvement in asthma control. Institutional Review Board Clinical Study registration number is 01081507. PMID:28546781

  20. Front view of bldg 30 which houses mission control

    NASA Image and Video Library

    1984-08-30

    41D-3072 (30 Aug 1984) --- A 41-D shift change is taking place in the Johnson Space Center's Building 30. In its twenty years of operation, the mission control center has been the scene of many such changes. The windowless wing at left houses three floors, including rooms supporting flight control rooms 1 & 2 (formerly called mission operations control rooms 1 & 2).

  1. VIEW OF CABLES AND TAPES ASSOCIATED WITH ADRIVE CONTROL ROD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF CABLES AND TAPES ASSOCIATED WITH A-DRIVE CONTROL ROD SYSTEM, AT LEVEL +15’, DIRECTLY ABOVE PDP CONTROL ROOM, LOOKING NORTHWEST. THE CABLES FROM THE PDP ROOM GO THROUGH THE CONCRETE WALL, MAKE A RIGHT ANGLE TURN DOWNWARD, AND DESCEND INTO THE PDP CONTROL ROOM AS VERTICAL TAPES - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  2. 10. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  3. 3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  4. 5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ROOM; PASS-THROUGH FOR EXPOSED FILM ON RIGHT - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  5. Measuring Human Performance in Simulated Nuclear Power Plant Control Rooms Using Eye Tracking

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, Casey Robert; Rice, Brandon Charles; Bower, Gordon Ross

    Control room modernization will be an important part of life extension for the existing light water reactor fleet. As part of modernization efforts, personnel will need to gain a full understanding of how control room technologies affect performance of human operators. Recent advances in technology enables the use of eye tracking technology to continuously measure an operator’s eye movement, which correlates with a variety of human performance constructs such as situation awareness and workload. This report describes eye tracking metrics in the context of how they will be used in nuclear power plant control room simulator studies.

  6. EM-1 Countdown Simulation with Charlie Blackwell-Thompson

    NASA Image and Video Library

    2018-03-29

    NASA Launch Director Charlie Blackwell-Thompson, center, stands next to her console in Firing Room 1 at the Kennedy Space Center's Launch Control Center. With her, from the left, are NASA intern Justin Connolly, NASA Engineering Project Manager Dan Tran, Blackwell-Thompson, Shawn Reverter, Project Manager for Red Canyon Software, Inc., and NASA Structures and Mechanisms Design Branch Chief Adam Dokos, during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.

  7. KSC-2014-1972

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  8. Interior of display area (room 101), looking south towards TV ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  9. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Obradovich, Jodi H.

    2011-09-30

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  10. Impact of imaging room environment: staff job stress and satisfaction, patient satisfaction, and willingness to recommend.

    PubMed

    Quan, Xiaobo; Joseph, Anjali; Ensign, Janet C

    2012-01-01

    The built environment significantly affects the healthcare experiences of patients and staff. Healthcare administrators and building designers face the opportunity and challenge of improving healthcare experience and satisfaction through better environmental design. The purpose of the study was to evaluate how a novel environmental intervention for imaging rooms, which integrated multiple elements of healing environments including positive distractions and personal control over environment, affects the perceptions and satisfactions of its primary users-patients and staff. Anonymous questionnaire surveys were conducted to compare patient and staff perceptions of the physical environment, satisfaction, and stress in two types of imaging rooms: imaging rooms with the intervention installed (intervention rooms) and traditionally designed rooms without the intervention (comparison rooms). Imaging technologists and patients perceived the intervention rooms to be significantly more pleasant-looking. Patients in the intervention rooms reported significantly higher levels of environmental control and were significantly more willing to recommend the intervention rooms to others. The environmental intervention was effective in improving certain aspects of the imaging environment: pleasantness and environmental control. Further improvement of the imaging environment is needed to address problematic areas such as noise.

  11. Dose-response effects for depression and Schizophrenia management on hospital utilization in Illinois Medicaid: a multivariate regression analysis.

    PubMed

    Berg, Gregory D; Donnelly, Shawn; Warnick, Kathleen; Medina, Wendie; Miller, Mary

    2014-07-03

    The prevalence of schizophrenia and depression in the United States is far higher among Medicaid recipients than in the general population. Individuals suffering from mental illness, including schizophrenia and depression, also have higher rates of emergency department utilization, which is costly and may not generate the positive health outcomes desired. Disease management programs strive to help individuals suffering from chronic illnesses better manage their condition(s) and seek health care in the appropriate settings. The objective of this manuscript is to estimate a dose-response impact on hospital inpatient and emergency room utilizations for any reason by Medicaid recipients with depression or schizophrenia who received disease management contacts. Multivariate regression analysis of panel data taken from administrative claims was conducted to test the hypothesis that increased contacts lower the likelihood of all-cause inpatient admissions and emergency room visits. Subjects included 6,274 members of Illinois' non-institutionalized Medicaid-only aged, blind or disabled population diagnosed with depression or schizophrenia. The statistical measure is the odds ratio. The odds ratio association is between the monthly utilization indicators and the number of contacts (doses) a member had for each particular disease management intervention. Higher numbers of intervention contacts for Medicaid recipients diagnosed with depression or schizophrenia were associated with statistically significant reductions in all-cause inpatient admissions and emergency room utilizations. There is a high correlation between depression and schizophrenia disease management contacts and lowered all-cause hospital inpatient and emergency room utilizations.

  12. 11. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. Advanced visualization platform for surgical operating room coordination: distributed video board system.

    PubMed

    Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas

    2006-06-01

    One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.

  14. Modeling work of the dispatching service of high-rise building as queuing system

    NASA Astrophysics Data System (ADS)

    Dement'eva, Marina; Dement'eva, Anastasiya

    2018-03-01

    The article presents the results of calculating the performance indicators of the dispatcher service of a high-rise building as a queuing system with an unlimited queue. The calculation was carried out for three models: with a single control room and brigade of service, with a single control room and a specialized service, with several dispatch centers and specialized services. The aim of the work was to investigate the influence of the structural scheme of the organization of the dispatcher service of a high-rise building on the amount of operating costs and the time of processing and fulfilling applications. The problems of high-rise construction and their impact on the complication of exploitation are analyzed. The composition of exploitation activities of high-rise buildings is analyzed. The relevance of the study is justified by the need to review the role of dispatch services in the structure of management of the quality of buildings. Dispatching service from the lower level of management of individual engineering systems becomes the main link in the centralized automated management of the exploitation of high-rise buildings. With the transition to market relations, the criterion of profitability at the organization of the dispatching service becomes one of the main parameters of the effectiveness of its work. A mathematical model for assessing the efficiency of the dispatching service on a set of quality of service indicators is proposed. The structure of operating costs is presented. The algorithm of decision-making is given when choosing the optimal structural scheme of the dispatching service of a high-rise building.

  15. KSC-2014-1971

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  16. A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BLanc, Katya Le; Powers, David; Joe, Jeffrey

    2015-08-01

    Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologiesmore » that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.« less

  17. About the Library - Betty Petersen Memorial Library

    Science.gov Websites

    , Maryland. History and Mission: Betty Petersen Memorial Library began as a reading room in the NOAA Science Center. The Reading Room was founded as a labor of love by Betty Petersen, librarian and wife of Dr Petersen managed the NOAA Science Center Reading Room from 1989 to 1994, when she transferred to the NOAA

  18. 29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  19. 28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  20. What Ambulatory Care Managers Need to Know About Examination Room Utilization Measurement and Analysis.

    PubMed

    Klarich, Mark J; Rea, Ronald W; Lal, Tarun Mohan; Garcia, Angel L; Steffens, Fay L

    2016-01-01

    Demand for ambulatory care visits is projected to increase 22% between 2008 and 2025. Given this growth, ambulatory care managers need to proactively plan for efficient use of scarce resources (ie, space, equipment, and staff). One important component of ambulatory care space (the number of examination rooms) is dependent on multiple factors, including variation in demand, hours of operation, scheduling, and staff. The authors (1) outline common data collection methods, (2) highlight analysis and reporting considerations for examination room utilization, and (3) provide a strategic framework for short- and long-term decision making for facility design or renovation.

  1. West wall, display area (room 101), view 1 of 4: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  2. Anesthetic Implications of Ebola Patient Management: A Review of the Literature and Policies.

    PubMed

    Missair, Andres; Marino, Michael J; Vu, Catherine N; Gutierrez, Juan; Missair, Alfredo; Osman, Brian; Gebhard, Ralf E

    2015-09-01

    As of mid-October 2014, the ongoing Ebola epidemic in Western Africa has affected approximately 10,000 patients, approached a 50% mortality rate, and crossed political and geographic borders without precedent. The disease has spread throughout Liberia, Guinea, and Sierra Leone. Isolated cases have arrived in urban centers in Europe and North America. The exponential growth, currently unabated, highlights the urgent need for effective and immediate management protocols for the various health care subspecialties that may care for Ebola virus disease patients. We conducted a comprehensive review of the literature to identify key areas of anesthetic care affected by this disease. The serious potential for "high-risk exposure" and "direct contact" (as defined by the Centers for Disease Control and Prevention) of anesthesiologists caring for Ebola patients prompted this urgent investigation. A search was conducted using MEDLINE/PubMed, MeSH, Cochrane Review, and Google Scholar. Key words included "anesthesia" and/or "ebola" combined with "surgery," "intubation," "laryngoscopy," "bronchoscopy," "stethoscope," "ventilation," "ventilator," "phlebotomy," "venous cannulation," "operating room," "personal protection," "equipment," "aerosol," "respiratory failure," or "needle stick." No language or date limits were applied. We also included secondary-source data from government organizations and scientific societies such as the Centers for Disease Control and Prevention, World Health Organization, American Society of Anesthesiologists, and American College of Surgeons. Articles were reviewed for primary-source data related to inpatient management of Ebola cases as well as evidence-based management guidelines and protocols for the care of Ebola patients in the operative room, infection control, and health care worker personal protection. Two hundred thirty-six articles were identified using the aforementioned terminology in the scientific database search engines. Twenty articles met search criteria for information related to inpatient Ebola virus disease management or animal virology studies as primary or secondary sources. In addition, 9 articles met search criteria as tertiary sources, representing published guidelines. The recommendations developed in this article are based on these 29 source documents. Anesthesia-specific literature regarding the care of Ebola patients is very limited. Secondary-source guidelines and policies represent the majority of available information. Data from controlled animal experiments and tuberculosis patient research provide some evidence for the existing recommendations and identify future guideline considerations.

  3. True Cost of Amateur Clean rooms

    NASA Technical Reports Server (NTRS)

    Ramsey, W. Lawrence

    2005-01-01

    This viewgraph document reviews the cost factors for clean rooms that are not professionally built, monitored or maintained. These amateur clean rooms are built because scientist and engineers desire to create a clean room to build a part of an experiment that requires a clean room, and the program manager is looking to save money. However, in the long run these clean rooms may not save money, as the cost of maintenance may be higher due to the cost of transporting the crews, and if the materials were of lesser quality, the cost of modifications may diminish any savings, and the product may not be of the same quality. Several examples are shown of the clean rooms that show some of the problems that can arise from amateur clean rooms.

  4. Stepwise management of asthma.

    PubMed

    Khalid, Ayesha N

    2015-09-01

    Stepwise management of asthma remains an area of evolving research. Asthma is one of the most expensive chronic diseases in the United States; stepwise management is an important area of focus, with several recent guidelines recommending management. This is a review of published English language literature, focusing on management guidelines for asthma in adult and pediatric patients. Asthma is a chronic disease whose assessment of severity allows for therapeutic goals to match the impairment noted. Good evidence exists to aid risk reduction, leading to decreased emergency room visits, preventing loss of lung function in adults and lung growth in children, and optimizing pharmacotherapy with reduced side effects profile. Recent asthma management guidelines incorporate 4 components of asthma care including: monitoring of severity, patient education, controlling external triggers, and medications, including recent attention to medication adherence. Asthma is an expensive chronic disease with preventive measures leading to reduced healthcare costs. Future targeted cytokine therapy to decrease serum and blood eosinophils may become an integral part of asthma management. © 2015 ARS-AAOA, LLC.

  5. EM-1 Countdown Simulation with Charlie Blackwell-Thompson

    NASA Image and Video Library

    2018-03-29

    Space Launch System and Orion launch team engineers and managers monitor operations from their console in Firing Room 1 at the Kennedy Space Center's Launch Control Center during a countdown simulation for Exploration Mission 1. It was the agency's first simulation of a portion of the countdown for the first launch of a Space Launch System rocket and Orion spacecraft that will eventually take astronauts beyond low-Earth orbit to destinations such as the Moon and Mars.

  6. Promoting Hand Hygiene With a Lighting Prompt.

    PubMed

    Diegel-Vacek, Lauren; Ryan, Catherine

    2016-10-01

    The objective of this pilot study was to assess an automatic sink light design intervention as a prompt for clinician hand hygiene (as defined by World Health Organization [WHO]). Healthcare-associated infections (HAIs) are still leading causes of morbidity and mortality and contribute to burdens on our healthcare system. Hand hygiene has been related to reducing the rate of HAIs and positively impacting both patient and hospital outcomes. This pilot study was a prospective, longitudinal observational study of a convenience sample of healthcare clinicians. In one inpatient room, clinicians were exposed to a hand hygiene reminder that consisted of a light turning on over the sink as they entered. A control room (the adjacent inpatient room) did not have the intervention. A total of 88 clinician encounters were monitored during the study. On the first observation day at the initial activation of the signal light system, the percentage of clinicians performing hand hygiene upon entering a room was only 7% in the control room and 23% in the intervention room. During the second observation (Day 14), those percentages were 16% in the control room and 30% in the intervention room. During the third observation (Day 21), those percentages were 23% in the control room and 23% in the intervention room. The healthcare system frequently relies on expensive technology to improve healthcare delivery, but implementation of low-cost, low-technology methods such as this light may be effective in prompting hand hygiene. © The Author(s) 2016.

  7. Overutilization and underutilization of operating rooms - insights from behavioral health care operations management.

    PubMed

    Fügener, Andreas; Schiffels, Sebastian; Kolisch, Rainer

    2017-03-01

    The planning of surgery durations is crucial for efficient usage of operating theaters. Both planning too long and too short durations for surgeries lead to undesirable consequences, e.g. idle time, overtime, or rescheduling of surgeries. We define these consequences as operating room inefficiency. The overall objective of planning surgery durations is to minimize expected operating room inefficiency, since surgery durations are stochastic. While most health care studies assume economically rational behavior of decision makers, experimental studies have shown that decision makers often do not act according to economic incentives. Based on insights from health care operations management, medical decision making, behavioral operations management, as well as empirical observations, we derive hypotheses that surgeons' behavior deviates from economically rational behavior. To investigate this, we undertake an experimental study where experienced surgeons are asked to plan surgeries with uncertain durations. We discover systematic deviations from optimal decision making and offer behavioral explanations for the observed biases. Our research provides new insights to tackle a major problem in hospitals, i.e. low operating room utilization going along with staff overtime.

  8. [Design of an anesthesia and micro-environment information management system in mobile operating room].

    PubMed

    Wang, Xianwen; Liu, Zhiguo; Zhang, Wenchang; Wu, Qingfu; Tan, Shulin

    2013-08-01

    We have designed a mobile operating room information management system. The system is composed of a client and a server. A client, consisting of a PC, medical equipments, PLC and sensors, provides the acquisition and processing of anesthesia and micro-environment data. A server is a powerful computer that stores the data of the system. The client gathers the medical device data by using the C/S mode, and analyzes the obtained HL7 messages through the class library call. The client collects the micro-environment information with PLC, and finishes the data reading with the OPC technology. Experiment results showed that the designed system could manage the patient anesthesia and micro-environment information well, and improve the efficiency of the doctors' works and the digital level of the mobile operating room.

  9. Operating room fires in periocular surgery.

    PubMed

    Connor, Michael A; Menke, Anne M; Vrcek, Ivan; Shore, John W

    2018-06-01

    A survey of ophthalmic plastic and reconstructive surgeons as well as seven-year data regarding claims made to the Ophthalmic Mutual Insurance Company (OMIC) is used to discuss operating room fires in periocular surgery. A retrospective review of all closed claim operating room fires submitted to OMIC was performed. A survey soliciting personal experiences with operating room fires was distributed to all American Society of Oculoplastic and Reconstructive Surgeons. Over the last 2 decades, OMIC managed 7 lawsuits resulting from an operating room fire during periocular surgery. The mean settlement per lawsuit was $145,285 (range $10,000-474,994). All six patients suffered burns to the face, and three required admission to a burn unit. One hundred and sixty-eight surgeons participated in the online survey. Approximately 44% of survey respondents have experienced at least one operating room fire. Supplemental oxygen was administered in 88% of these cases. Most surgical fires reported occurred in a hospital-based operating room (59%) under monitored anesthesia care (79%). Monopolar cautery (41%) and thermal, high-temperature cautery (41%) were most commonly reported as the inciting agents. Almost half of the patients involved in a surgical fire experienced a complication from the fire (48%). Sixty-nine percent of hospital operating rooms and 66% of ambulatory surgery centers maintain an operating room fire prevention policy. An intraoperative fire can be costly for both the patient and the surgeon. Ophthalmic surgeons operate in an oxygen rich and therefore flammable environment. Proactive measures can be undertaken to reduce the incidence of surgical fires periocular surgery; however, a fire can occur at any time and the entire operating room team must be constantly vigilant to prevent and manage operating room fires.

  10. Damage Control Strategy and aggressive resuscitation in polytraumatized patient with severe hypothermia. Importance of multidisciplinary management from the territory to the operating room. Case report.

    PubMed

    Bellanova, Giovanni; Motta, Alessandro; Mazzetti, Chiara; Motter, Michele; Fabris, Luca; DeVigili, Giorgio; Liguori, Gerardo

    2013-01-01

    Our objective is to describe a case of hypothermic politrauma management in our country. We report the case of a 29-year-old male who was a beating victim and fell off from 4 meters, and was afterwards found after an unknown time interval. The patient came to our DEA in cardiac arrest and underwent to a aggressive and prolonged resuscitation which included sternotomy and extracorporeal circulation. The patient was discharged in 40th postoperative day without neurologic complications and complete recovery. Even without a dedicated protocol for the hypothermic politrauma the correct multidisciplinary approach lead to the complete recovery of the patient. In literature many papers describe the aggressive resuscitation of hypothermic patients underlining that the politrauma management must be multidisciplinar. We want to underline the importance of the "Damage control strategy" in a politrauma team in the major hospitals in our country. Cardiopulmonary resuscitation, Extracorporeal circulation, Hypothermia, Polytrauma, Trauma team.

  11. Asthma-related health services and asthma control among women in Puerto Rico

    PubMed Central

    Ortiz-Rivera, María Calixta

    2018-01-01

    Objectives: This study evaluates social, behavioral, and environmental determinants to differentiate between active and inactive asthma and how predisposing, enabling, and need factors elucidate asthma-related health services and asthma control among women in Puerto Rico. Methods: This study analyzed secondary cross-sectional data from a subsample of 625 adult females who participated in the Asthma Call Back Survey in Puerto Rico. Logistic and multinomial regression analyses were conducted to examine associations between explanatory variables and asthma outcomes. Results: In total, 63% of women reported active asthma, from which 37.9% have not well controlled or very poorly controlled asthma. Women with active asthma were significantly more likely to be out of work, have middle income (US$25,000–

  12. Design of the thermal insulating test system for doors and windows of buildings

    NASA Astrophysics Data System (ADS)

    Yu, Yan; Qi, Jinqing; Xu, Yunwei; Wu, Hao; Ou, Jinping

    2011-04-01

    Thermal insulating properties of doors and widows are important parameter to measure the quality of windows and doors. This paper develops the thermal insulating test system of doors and windows for large temperature difference in winter in north of China according to national standards. This system is integrated with temperature measurement subsystem, temperature control subsystem, the heating power measurement subsystem, and heat transfer coefficient calculated subsystem. The temperature measurement subsystem includes temperature sensor which is implemented by sixty-four thermocouple sensors to measure the key positions of cold room and hot room, and the temperature acquisition unit which adopts Agilent 34901A data acquisition card to achieve self-compensation and accurate temperature capture. The temperature control subsystem including temperature controller and compressor system is used to control the temperature between 0 degree to 20 degree for hot room and -20 degree to 0 degree for cold room. The hot room controller uses fuzzy control algorithm to achieve accurate control of temperature and the cold room controller firstly uses compressor to achieve coarse control and then uses more accurate temperature controller unit to obtain constant temperature(-20 degree). The heating power measurement is mainly to get the heat power of hot room heating devices. After above constant temperature environment is constructed, software of the test system is developed. Using software, temperature data and heat power data can be accurately got and then the heat transfer coefficient, representing the thermal insulating properties of doors and widows, is calculated using the standard formula. Experimental results show that the test system is simple, reliable and precise. It meets the testing requirements of national standard and has a good application prospect.

  13. Lean management in academic surgery.

    PubMed

    Collar, Ryan M; Shuman, Andrew G; Feiner, Sandra; McGonegal, Amy K; Heidel, Natalie; Duck, Mary; McLean, Scott A; Billi, John E; Healy, David W; Bradford, Carol R

    2012-06-01

    Lean is a management system designed to enhance productivity by eliminating waste. Surgical practice offers many opportunities for improving efficiency. Our objective was to determine whether systematic implementation of lean thinking in an academic otolaryngology operating room improves efficiency and profitability and preserves team morale and educational opportunities. In an 18-month prospective quasi-experimental study, a multidisciplinary task force systematically implemented lean thinking within an otolaryngology operating room of an academic health system. Operating room turnover time and turnaround time were measured during a baseline period; an observer-effect period in which workers were made aware that their efficiency was being measured but before implementing lean changes; and an intervention period after redesign principles had been used. The impact on teamwork, morale, and surgical resident education were measured during the baseline and intervention periods through validated surveys. A profit model was applied to estimate the financial implications of the study. There was no difference between the baseline and observer-effect periods of the study for turnover time (p = 0.98) or turnaround time (p = 0.20). During the intervention period, the mean turnover time and turnaround time were significantly shorter than during the baseline period (29 vs 38 minutes; p < 0.001 and 69 vs 89 minutes; p < 0.001, respectively). The composite morale score suggested improved morale after implementation (p = 0.011). Educational metrics were unchanged before and after implementation. The annual opportunity revenue for the involved operating room is $330,000; when extrapolated throughout the operating rooms, lean thinking could create 6,500 hours of capacity annually. Application of lean management techniques to a single operating room and surgical service improved operating room efficiency and morale, sustained resident education, and can provide considerable financial gains when scaled to an entire academic surgical suite. Copyright © 2012. Published by Elsevier Inc.

  14. Software Support during a Control Room Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michele Joyce; Michael Spata; Thomas Oren

    2005-09-21

    In 2004, after 14 years of accelerator operations and commissioning, Jefferson Lab renovated its main control room. Changes in technology and lessons learned during those 14 years drove the control room redesign in a new direction, one that optimizes workflow and makes critical information and controls available to everyone in the control room. Fundamental changes in a variety of software applications were required to facilitate the new operating paradigm. A critical component of the new control room design is a large-format video wall that is used to make a variety of operating information available to everyone in the room. Analogmore » devices such as oscilloscopes and function generators are now displayed on the video wall through two crosspoint switchers: one for analog signals and another for video signals. A new software GUI replaces manual configuration of the oscilloscopes and function generators and helps automate setup. Monitoring screens, customized for the video wall, now make important operating information visible to everyone, not just a single operator. New alarm handler software gives any operator, on any workstation, access to all alarm handler functionality, and multiple users can now contribute to a single electronic logbook entry. To further support the shift to distributed access and control, many applications have been redesigned to run on servers instead of on individual workstations.« less

  15. KSC-05PD-0359

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. During an End-to-End (ETE) Mission Management Team (MMT) launch simulation at KSC, Mike Rein, division chief of Media Services, and Lisa Malone, director of External Relations and Business Development at KSC, work the consoles. In Firing Room 1 at KSC, Shuttle launch team members put the Shuttle system through an integrated simulation. The control room is set up with software used to simulate flight and ground systems in the launch configuration. The ETE MMT simulation included L-2 and L-1 day Prelaunch MMT meetings, an external tanking/weather briefing, and a launch countdown. The ETE transitioned to the Johnson Space Center for the flight portion of the simulation, with the STS-114 crew in a simulator at JSC. Such simulations are common before a launch to keep the Shuttle launch team sharp and ready for liftoff.

  16. 5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  17. 83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 10. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Credit BG. Interior of control and observation room at Control and Recording Center Building 4221/E-22. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  19. 78 FR 27937 - Environmental Impact Statement; Feral Swine Damage Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... ;D=APHIS-2013- 0031 or in our reading room, which is located in room 1141 of the USDA South Building, 14th Street and Independence Avenue SW., Washington, DC. Normal reading room hours are 8 a.m. to 4:30 p... expand at a much faster rate than local governments and APHIS have been able to address them. We believe...

  20. New ergonomic and functional design of digital conferencing rooms in a clinical environment

    NASA Astrophysics Data System (ADS)

    Ratib, Osman M.; Amato, Carlos L.; McGill, D. Ric; Liu, Brent J.; Balbona, Joseph A.; McCoy, J. Michael

    2003-05-01

    Clinical conferences and multidisciplinary medical rounds play a major role in patient management and decision-making relying on presentation of variety of documents: films, charts, videotapes, graphs etc. These conferences and clinical rounds are often carried out in conferencing rooms or department libraries that are usually not suitable for presentation of the data in electronic format. In most instances digital projection equipment is added to existing rooms without proper consideration to functional, ergonomic, acoustical, spatial and environmental requirements. Also, in large academic institutions, the conference rooms serve multiple purposes including as classrooms for teaching and education of students and for administrative meetings among managers and staff. In the migration toward a fully digital hospital we elected to analyze the functional requirements and optimize the ergonomic design of conferencing rooms that can accommodate clinical rounds, multidisciplinary reviews, seminars, formal lectures and department meetings. 3D computer simulation was used for better evaluation and analysis of spatial and ergonomic parameters and for gathering opinions and input from users on different design options. A critical component of the design is the understanding of the different workflow and requirements of different types of conferences and presentations that can be carried out in these conference rooms.

  1. Synchronization software for automation in anesthesia.

    PubMed

    Bressan, Nadja; Castro, Ana; Brás, Susana; Oliveira, Hélder P; Ribeiro, Lénio; Ferreira, David A; Antunes, Luís; Amorim, Pedro; Nunes, Catarina S

    2007-01-01

    This work presents the development of a software for data acquisition and control (ASYS) on a clinical setup. Similar to the industrial Supervisory Control And Data Acquisition (SCADA) the software assembles a Target Controlled Infusion (TCI) monitoring and supervisory control data in real time from devices in a surgical room. The software is not a full controller since the TCI systems comprehend permanent interaction from the anesthesiologist. Based on pharmacokinetic models, the effect-site and plasma concentrations can be related with the drug dose infused and vice versa. The software determines the infusion rates of the drug which are given as commands to the infusion pumps. This software provides the anesthesiologist with a trustworthy tool for managing a safe and balanced anesthesia. Since it also incorporates the acquisition and display of patients brain signals.

  2. Nuclear reactor control room construction

    DOEpatents

    Lamuro, R.C.; Orr, R.

    1993-11-16

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures.

  3. Nuclear reactor control room construction

    DOEpatents

    Lamuro, Robert C.; Orr, Richard

    1993-01-01

    A control room 10 for a nuclear plant is disclosed. In the control room, objects 12, 20, 22, 26, 30 are no less than four inches from walls 10.2. A ceiling 32 contains cooling fins 35 that extend downwards toward the floor from metal plates 34. A concrete slab 33 is poured over the plates. Studs 36 are welded to the plates and are encased in the concrete.

  4. Asthma control and need for future asthma controller therapy among inner-city Hispanic asthmatic children engaged in a pediatric asthma disease management program (the Breathmobile program, Mobile Asthma Care for Kids Network).

    PubMed

    Scott, Lyne; Li, Marilyn; Thobani, Salima; Nichols, Breck; Morphew, Tricia; Kwong, Kenny Yat-Choi

    2016-08-01

    To determine whether significant numbers of asthmatic children with initially rated intermittent asthma later suffer poor asthma control and require the addition of controller medications. Inner-city Hispanic children were followed prospectively in an asthma-specific disease management system (Breathmobile) for a period of 2 years. Clinical asthma symptoms, morbidity treatment, and demographic data were collected at each visit. Treatment was based upon National Heart, Lung, and Blood Institute (NHLBI) Expert Panel Report 3 asthma guidelines. Primary outcome was percentage of patients with intermittent asthma who had not well or poorly controlled asthma during subsequent visits and required controller agents. Secondary outcomes were factors associated with the maintenance of asthma control. About 30.9% of the patients with initial rating of intermittent asthma had not well controlled and poorly controlled asthma during subsequent visits and required the addition of controller agents. Factors associated with good asthma control were compliance, no previous emergency room visits and previous visit during spring season. Asthmatic children with intermittent asthma often lose asthma control and require controller therapy. This justifies asthma guideline recommendations to assess asthma control at follow-up visits and adjust therapy accordingly.

  5. Development of formulations of biological agents for management of root rot of lettuce and cucumber.

    PubMed

    Amer, G A; Utkhede, R S

    2000-09-01

    The effect of various carrier formulations of Bacillus subtilis and Pseudomonas putida were tested on germination, growth, and yield of lettuce and cucumber crops in the presence of Pythium aphanidermatum and Fusarium oxysporum f.sp. cucurbitacearum, respectively. Survival of B. subtilis and P. putida in various carriers under refrigeration (about 0 degree C) and at room temperature (about 22 degrees C) was also studied. In all carrier formulations, B. subtilis strain BACT-0 survived up to 45 days. After 45 days of storage at room temperature (about 22 degrees C), populations B. subtilis strain BACT-0 were significantly higher in vermiculite, kaolin, and bacterial broth carriers compared with other carriers. Populations of P. putida were significantly higher in vermiculite, peat moss, wheat bran, and bacterial broth than in other carriers when stored either under refrigeration (about 0 degree C) or at room temperature (about 22 degrees C) for 15 or 45 days. Germination of lettuce seed was not affected in vermiculite, talc, kaolin, and peat moss carriers, but germination was significantly reduced in alginate and bacterial broth carriers of B. subtilis compared to the non-treated control. Germination of cucumber seed was not affected by any of the carriers. Significantly higher fresh lettuce and root weights were observed in vermiculite and kaolin carriers of B. subtilis compared with P. aphanidermatum-inoculated control plants. Lettuce treated with vermiculite, and kaolin carriers of B. subtilis, or non-inoculated control lettuce plants had significantly lower root rot ratings than talc, peat moss, bacterial broth, and P. aphanidermatum-inoculated control plants. Growth and yield of cucumber plants were significantly higher in vermiculite-based carrier of P. putida than the other carriers and Fusarium oxysporum f.sp. cucurbitacearum-inoculated plants.

  6. 17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON LEFT, SIGNAL CONTROLS ON RIGHT, WHISTLE PULL TOP. RADIO TELEPHONE IN CENTER BACK (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  7. Prophylactic dressing application to reduce pressure ulcer formation in cardiac surgery patients.

    PubMed

    Brindle, C Tod; Wegelin, Jacob A

    2012-01-01

    The study was designed to determine if application of a self-adherent silicone border foam dressing would reduce pressure ulcer incidence when compared to standard preventive interventions among patients managed in a cardiac surgery intensive care unit (CSICU). One hundred consecutive patients in the CSICU at Virginia Commonwealth University Medical Center in Richmond participated in the study. Fifteen were subsequently excluded due to incomplete data or failure to remain in the CSICU for at least 48 hours. Of the 100 subjects consecutively enrolled, 56 subjects were assigned to the intervention group with attrition of 6 subjects (6/56), and 39 were assigned to the standard care comparison group with attrition of 4 subjects (4/39). Five study forms were lost and the group assignment of those subjects is unknown. Patients admitted to the CSICU were assigned to either standard treatment or an intervention group consisting of standard preventive care plus application of the silicone border foam dressing. The assignment of subjects to these groups was done in a nonrandom manner, via prestudy room designation (7 intervention rooms/7 standard practice rooms) and room availability on call from the operating room. The charge nurse and bed management staff were unaware of room designation, and staff did not know which group the subjects were assigned to until they admitted the patient and opened the bedside chart that indicated group assignment. Twenty-one covariates were compared between the 2 groups. A Cox proportional hazards model was computed to compare the hazard (risk per unit time) of developing a pressure ulcer between these groups. Propensity score covariate adjustment was performed to adjust for any imbalance between the groups. Nine pressure ulcers developed during the course of the study. Eight pressure ulcers developed in 4 out of 35 patients who received standard preventive care; 5 were classified as suspected deep tissue injuries and 3 were classified as stage II pressure ulcers. One pressure ulcer developed in 1 out of 50 patients in the intervention group; it was classified as suspected deep tissue injury. No statistically significant difference in any covariate was found between the groups (all P > .058). The group that received standard care had a hazard ratio of 3.6 in relation to the intervention group, but this difference was not statistically significant (P = .3). Pressure ulcer incidence was lower than anticipated over the study period for both groups. No statistically significant difference in pressure ulcer incidence between the intervention and control groups was found. A randomized controlled trial based on a power analysis is needed to more precisely determine the efficacy of a silicone border foam dressing for prevention of pressure ulcers in the intensive care unit.

  8. Difficulties and challenges associated with literature searches in operating room management, complete with recommendations.

    PubMed

    Wachtel, Ruth E; Dexter, Franklin

    2013-12-01

    The purpose of this article is to teach operating room managers, financial analysts, and those with a limited knowledge of search engines, including PubMed, how to locate articles they need in the areas of operating room and anesthesia group management. Many physicians are unaware of current literature in their field and evidence-based practices. The most common source of information is colleagues. Many people making management decisions do not read published scientific articles. Databases such as PubMed are available to search for such articles. Other databases, such as citation indices and Google Scholar, can be used to uncover additional articles. Nevertheless, most people who do not know how to use these databases are reluctant to utilize help resources when they do not know how to accomplish a task. Most people are especially reluctant to use on-line help files. Help files and search databases are often difficult to use because they have been designed for users already familiar with the field. The help files and databases have specialized vocabularies unique to the application. MeSH terms in PubMed are not useful alternatives for operating room management, an important limitation, because MeSH is the default when search terms are entered in PubMed. Librarians or those trained in informatics can be valuable assets for searching unusual databases, but they must possess the domain knowledge relative to the subject they are searching. The search methods we review are especially important when the subject area (e.g., anesthesia group management) is so specific that only 1 or 2 articles address the topic of interest. The materials are presented broadly enough that the reader can extrapolate the findings to other areas of clinical and management issues in anesthesiology.

  9. 11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  10. Photographic art in exam rooms may reduce white coat hypertension.

    PubMed

    Harper, Michael B; Kanayama-Trivedi, Stacy; Caldito, Gloria; Montgomery, David; Mayeaux, E J; DelRosso, Lourdes M

    2015-12-01

    Blood pressure (BP) elevation in medical office settings in patients who are normotensive in nonmedical settings is an effect known as 'white coat hypertension'. This phenomenon is thought to be due to situational anxiety caused by the experience of visiting a doctor and the anxiety-inducing nature of the medical office. Our study was designed to determine if carefully selected photographic art could counter the anxiety that causes white coat hypertension and lead to lower BP recordings in some patients. 117 adults, non-pregnant patients from the Louisiana State University Health Sciences Center Family Medicine Resident Clinic participated in this study. After the triage nurse measured the BP, the patients were randomly placed in either an exam room with standard medical posters (control room) or in an exam room with photographic art (photo room). The BP was measured in the exam room. After the medical visit, the patients switched rooms and the BP was measured a third time. The patients were asked to fill out a questionnaire to identify room preference. On average, the BP obtained in the control rooms was higher than that obtained in the photo rooms. There was a statistically significant difference between the mean arterial pressure, systolic BP and diastolic BP between the control room and the photo room. Landscape photographic art may have the beneficial effect of reducing BP in medical office examination rooms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  11. 76 FR 23613 - Draft Programmatic Environmental Assessment for Hazard Mitigation Safe Room Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... Emergency Management Agency (FEMA) may provide funding to eligible applicants for eligible, feasible, and... from hazards and their effects. One such activity is the construction and installation of safe rooms to...

  12. Federal Reading Rooms for Risk Management Plans (RMP)

    EPA Pesticide Factsheets

    Reading Rooms, listed here by state, are open to the public by either appointment or walk-in. You may access Off-Site Consequence Analysis (scenarios) portions of RMPs, and take notes but not remove or reproduce materials.

  13. CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA

  14. Management of Meconium-Stained Newborns in the Delivery Room.

    PubMed

    Gandhi, Chintan Kiritkumar

    2018-05-01

    The approach to the management of meconium-stained newborns in the delivery room has been changing for over 40 years. The goal is to prevent meconium aspiration syndrome (MAS) and complications related to MAS. For decades, airway obstruction was believed to be a major component of MAS and, consequently, suction maneuvers to remove meconium from the airways were recommended to decrease the frequency and severity of MAS. Initial recommendations were based on observational studies. However, the incidence of MAS and mortality related to MAS has declined since the 1970s, mostly because of a decrease in the number of postterm deliveries. Recently updated guidelines by the American Heart Association and the Neonatal Resuscitation Program have reflected the strength of evidence supporting tracheal intubation and suctioning for nonvigorous, meconium-stained newborns. This article examines practice change since the 1970s in the delivery room management of meconium-stained newborns and evaluates evidence behind the changes.

  15. 2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  16. TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  17. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X Launch Director Ed Mango, 3rd from left, along with other mission managers watches the launch of the Ares I-X rocket from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  18. SUPERTANK Laboratory Data Collection Project. Volume 1. Main Text

    DTIC Science & Technology

    1994-01-01

    gauge elec- tronics housing and sensing wire were pre- drilled with 1/8-in.- (3.2-mm-) diameter holes spaced every 2 in. (5.08 cm). This support rod...wave gauges and current meters were sampled at 16 Hz and other instruments were sampled at 10 Hz, shorter runs gave data files that were manageable in...Chapter 1 Introduction to SUPERTANK Figure 1-1. Wide-area view of LWT channel and control room during SUPERTANK (capacitance wave gauges in foreground

  19. 11. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Credit BG. Interior of control and observation room at Control and Recording Center, showing detail of switchboard and closed circuit television monitors. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  20. 5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL HOUSE LOCATED ON THE SOUTH END OF BIG TUJUNGA DAM SHOWING THE CONTROL PANEL. - Big Tujunga Dam, Control House, 809 West Big Tujunga Road, Sunland, Los Angeles County, CA

  1. Nonoperative management of splenic injuries.

    PubMed

    Oller, B; Armengol, M; Camps, I; Rodriguez, N; Montero, A; Inaraja, L; Salvia, M D; Salva, J A

    1991-07-01

    The traditional management of splenic trauma has undergone major revision in recent years. Given the physiological importance of the spleen, certain controversy has arisen regarding the most appropriate method of managing this type of trauma. Nonoperative therapy in children has proven to be successful not only in the case of kidney lesions but also for splenic lesions. Nonoperative management carried out in the authors' hospital on a group of 56 patients (49 adults and seven children over the age of 7 years) has proved successful in 37 cases. The success of this technique requires a well-formulated protocol, diagnostic methods (ultrasound and computed tomography), rigorous patient control in the emergency room during the initial phase (first 48 hours), the availability of a medical team if surgical intervention becomes necessary (persistent or recurrent hemorrhage), and complementary measures which facilitate the cicatrization of the splenic injury (bed rest, antibiotic therapy).

  2. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial.

    PubMed

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-05-01

    One of the strategies for a good outcome and pain free childbearing is to design the delivery room. The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants' intervention vs. 66% of control participants had perinea laceration (P = 0.041). According to the findings of the present study, distracting senses in snoezelen room decreases mother's pain intensity, the length of labor, and incidence of episiotomy.

  3. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial

    PubMed Central

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-01-01

    Background: One of the strategies for a good outcome and pain free childbearing is to design the delivery room. Objectives: The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. Patients and Methods: This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. Results: The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants’ intervention vs. 66% of control participants had perinea laceration (P = 0.041). Conclusions: According to the findings of the present study, distracting senses in snoezelen room decreases mother’s pain intensity, the length of labor, and incidence of episiotomy. PMID:26082849

  4. Mickey Leland Energy Fellowship Report: Development of Advanced Window Coatings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolton, Ladena A.; Alvine, Kyle J.; Schemer-Kohrn, Alan L.

    2014-08-05

    Advanced fenestration technologies for light and thermal management in building applications are of great recent research interest for improvements in energy efficiency. Of these technologies, there is specific interest in advanced window coating technologies that have tailored control over the visible and infrared (IR) scattering into a room for both static and dynamic applications. Recently, PNNL has investigated novel subwavelength nanostructured coatings for both daylighting, and IR thermal management applications. Such coatings rese still in the early stages and additional research is needed in terms of scalable manufacturing. This project investigates aspects of a potential new methodology for low-cost scalablemore » manufacture of said subwavelength coatings.« less

  5. Default options and neonatal resuscitation decisions.

    PubMed

    Haward, Marlyse Frieda; Murphy, Ryan O; Lorenz, John M

    2012-12-01

    To determine whether presenting delivery room management options as defaults influences decisions to resuscitate extremely premature infants. Adult volunteers recruited from the world wide web were randomised to receive either resuscitation or comfort care as the delivery room management default option for a hypothetical delivery of a 23-week gestation infant. Participants were required to check a box to opt out of the default. The primary outcome measure was the proportion of respondents electing resuscitation. Data were analysed using χ(2) tests and multivariate logistic regression. Participants who were told the delivery room management default option was resuscitation were more likely to opt for resuscitation (OR 6.54 95% CI 3.85 to 11.11, p<0.001). This effect persisted on multivariate regression analysis (OR 7.00, 95% CI 3.97 to 12.36, p<0.001). Female gender, being married or in a committed relationship, being highly religious, experiences with prematurity, and favouring sanctity of life were significantly associated with decisions to resuscitate. Presenting delivery room options for extremely premature infants as defaults exert a significant effect on decision makers. The information structure of the choice task may act as a subtle form of manipulation. Further, this effect may operate in ways that a decision maker is not aware of and this raises questions of patient autonomy. Presenting delivery room options for extremely premature infants as defaults may compromise autonomous decision-making.

  6. A simulator-based nuclear reactor emergency response training exercise.

    PubMed

    Waller, Edward; Bereznai, George; Shaw, John; Chaput, Joseph; Lafortune, Jean-Francois

    Training offsite emergency response personnel basic awareness of onsite control room operations during nuclear power plant emergency conditions was the primary objective of a week-long workshop conducted on a CANDU® virtual nuclear reactor simulator available at the University of Ontario Institute of Technology, Oshawa, Canada. The workshop was designed to examine both normal and abnormal reactor operating conditions, and to observe the conditions in the control room that may have impact on the subsequent offsite emergency response. The workshop was attended by participants from a number of countries encompassing diverse job functions related to nuclear emergency response. Objectives of the workshop were to provide opportunities for participants to act in the roles of control room personnel under different reactor operating scenarios, providing a unique experience for participants to interact with the simulator in real-time, and providing increased awareness of control room operations during accident conditions. The ability to "pause" the simulator during exercises allowed the instructors to evaluate and critique the performance of participants, and to provide context with respect to potential offsite emergency actions. Feedback from the participants highlighted (i) advantages of observing and participating "hands-on" with operational exercises, (ii) their general unfamiliarity with control room operational procedures and arrangements prior to the workshop, (iii) awareness of the vast quantity of detailed control room procedures for both normal and transient conditions, and (iv) appreciation of the increased workload for the operators in the control room during a transient from normal operations. Based upon participant feedback, it was determined that the objectives of the training had been met, and that future workshops should be conducted.

  7. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  8. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  9. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  10. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  11. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  12. 12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  13. 75 FR 53951 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ...) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will be held September 20-23, 2010. The...., Building 4, Observer Training Room (GOA Plan Team) and Traynor Room (BS/AI Plan Team), Seattle, WA. Council...

  14. IET control building (TAN620). control room. facing north. control consoles ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. 75 FR 1683 - Financial Management Service; Proposed Collection of Information: Assignment Form

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service; Proposed Collection of Information: Assignment Form AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice... Management Service, Records and Information Management Branch, Room 135, 3700 East West Highway, Hyattsville...

  16. Development of a self-assessment tool for measuring competences of obstetric nurses in rooming-in wards in China

    PubMed Central

    Zhang, Ju; Ye, Wenqin; Fan, Fan

    2015-01-01

    Introduction: To provide high-quality nursing care, a reliable and feasible competency assessment tool is critical. Although several questionnaire-based competency assessment tools have been reported, a tool specific for obstetric nurses in rooming-in wards is lacking. Therefore, the purpose of this research is to develop a competency assessment tool for obstetric rooming-in ward nurses. Methods: A literature review was conducted to create an individual intensive interview with 14 nurse managers, educators, and primary nurses in rooming-in wards. Expert reviews (n = 15) were conducted to identify emergent themes in a Delphi fashion. A competency assessment questionnaire was then developed and tested with 246 rooming-in ward nurses in local hospitals. Results: We constructed a three-factor linear model for obstetric rooming-in nurse competency assessment. Further refinement resulted in a self-assessment questionnaire containing three first-tier, 12 second-tier, and 43 third-tier items for easy implementation. The questionnaire was reliable, contained satisfactory content, and had construct validity. Discussion: Our competency assessment tool provides a systematic, easy, and operational subjective evaluation model for nursing managers and administrators to evaluate obstetric rooming-in ward primary nurses. The application of this tool will facilitate various human resources functions, such as nurse training/education effect evaluation, and will eventually promote high-quality nursing care delivery. PMID:26770468

  17. MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  18. [The use of an opect optic system in neurosurgical practice].

    PubMed

    Kalinovskiy, A V; Rzaev, D A; Yoshimitsu, K

    2018-01-01

    Modern neurosurgical practice is impossible without access to various information sources. The use of MRI and MSCT data during surgery is an integral part of the neurosurgeon's daily practice. Devices capable of managing an image viewer system without direct contact with equipment simplify working in the operating room. To test operation of a non-contact MRI and MSCT image viewer system in the operating room and to evaluate the system effectiveness. An Opect non-contact image management system developed at the Tokyo Women's Medical University was installed in one of the operating rooms of the Novosibirsk Federal Center of Neurosurgery in 2014. In 2015, the Opect system was used by operating surgeons in 73 surgeries performed in the same operating room. The system effectiveness was analyzed based on a survey of surgeons. The non-contact image viewer system occurred to be easy-to-learn for the personnel to operate this system, easy-to-manage it, and easy-to-present visual information during surgery. Application of the Opect system simplifies work with neuroimaging data during surgery. The surgeon can independently view series of relevant MRI and MSCT scans without any assistance.

  19. An intervention for noise control of blast furnace in steel industry.

    PubMed

    Golmohammadi, Rostam; Giahi, Omid; Aliabadi, Mohsen; Darvishi, Ebrahim

    2014-01-01

    Noise pollution is currently a major health risk factor for workers in industries. The aim of this study was to investigate noise pollution and implement a control intervention plan for blast furnace in a steel industry. The measurement of sound pressure level (SPL) along with frequency analysis was done with the sound-level-meter Cell-450. Personal noise exposure was performed using dosimeter TES-1345 calibrated with CEL-282. Before planning noise controls, acoustic insulation properties of the furnace control unit and workers' rest room were assessed. Control room and workers' rest room were redesigned in order to improve acoustical condition. The SPL before intervention around the Blast Furnace was 90.3 dB (L) and its dominant frequency was 4000 Hz. Besides, noise transmission loss of the control and rest rooms were 10.3 dB and 4.2 dB, respectively. After intervention, noise reduction rates in the control and rest rooms were 27.4 dB and 27.7 dB, respectively. The workers' noise dose before and after the intervention was 240% and less than 100%, respectively. Improvement the workroom acoustic conditions through noise insulation can be considered effective method for preventing workers exposure to harmful noise.

  20. A field demonstration of energy conservation using occupancy sensor lighting control in equipment rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagle, J.E.

    1992-09-01

    The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less

  1. 27. Pump Room interiorDrainage pump motor control center with main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Pump Room interior-Drainage pump motor control center with main valve control panel at right. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA

  2. 31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  3. 30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  4. Front view of bldg 30 which houses mission control

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Front view of bldg 30 which houses mission control. A shift change for the 41-D mission is underway. The windowless wing at left houses three floors, including rooms supporting flight control room 1 and 2.

  5. 11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  6. 12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  7. Sugammadex for reversal of neuromuscular blockade: a retrospective analysis of clinical outcomes and cost-effectiveness in a single center.

    PubMed

    Carron, Michele; Baratto, Fabio; Zarantonello, Francesco; Ori, Carlo

    2016-01-01

    The aim of the study is to evaluate the clinical and economic impact of introducing a rocuronium-neostigmine-sugammadex strategy into a cisatracurium-neostigmine regimen for neuromuscular block (NMB) management. We conducted a retrospective analysis of clinical outcomes and cost-effectiveness in five operating rooms at University Hospital of Padova. A clinical outcome evaluation after sugammadex administration as first-choice reversal drug in selected patients (rocuronium-sugammadex) and as rescue therapy after neostigmine reversal (rocuronium-neostigmine-sugammadex) compared to control was performed. A cost-analysis of NMB management accompanying the introduction of a rocuronium-neostigmine-sugammadex strategy into a cisatracurium-neostigmine regimen was carried out. To such purpose, two periods were compared: 2011-2012, without sugammadex available; 2013-2014, with sugammadex available. A subsequent analysis was performed to evaluate if sugammadex replacing neostigmine as first choice reversal drug is cost-effective. The introduction of a rocuronium-neostigmine-sugammadex strategy into a cisatracurium-neostigmine regimen reduced the average cost of NMB management by 36%, from €20.8/case to €13.3/case. Patients receiving sugammadex as a first-choice reversal drug (3%) exhibited significantly better train-of-four ratios at extubation (P<0.001) and were discharged to the surgical ward (P<0.001) more rapidly than controls. The cost-saving of sugammadex as first-choice reversal drug has been estimated to be €2.9/case. Patients receiving sugammadex as rescue therapy after neostigmine reversal (3.2%) showed no difference in time to discharge to the surgical ward (P=0.44) compared to controls. No unplanned intensive care unit (ICU) admissions with rocuronium-neostigmine-sugammadex strategy were observed. The potential economic benefit in avoiding postoperative residual curarization (PORC)-related ICU admission in the 2013-2014 period was estimated at an average value of €13,548 (€9,316-€23,845). Sugammadex eliminated PORC and associated morbidities. In our center, sugammadex reduced the costs of NMB management and promoted rapid turnover of patients in operating rooms, with total cost-effectiveness that counteracts the disadvantages of its high cost.

  8. Atmospheric Tracer Depletion Testing for Unfiltered Air In-Leakage Determination at the Wolf Creek Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, T. M.; Wilke, R. J.; Roberts, T.

    Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building. The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference. Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test. The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less

  9. Atmospheric Tracer Depletion Testing for Unfiltered Air In-Leakage Determination at the Wolf Creek Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, T. M.; Wilke, R. J.; Roberts, T.

    Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building.The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference.Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test.The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less

  10. MISSION CONTROL CENTER (MCC) VIEW - CONCLUSION APOLLO 11 CELEBRATION - MSC

    NASA Image and Video Library

    1969-07-24

    S69-40024 (24 July 1969) --- NASA and Manned Spacecraft Center (MSC) officials join in with the flight controllers, in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), in celebrating the successful conclusion of the Apollo 11 lunar landing mission. Identifiable in the picture, starting in foreground, are Dr. Robert R. Gilruth, MSC Director; George M. Low, Manager, Apollo Spacecraft Program, MSC; Dr. Christopher C. Kraft Jr., MSC Director of Flight Operation; U.S. Air Force Lt. Gen. Samuel C. Phillips (with glasses, looking downward), Apollo Program Director, Office of Manned Space Flight, NASA Headquarters; and Dr. George E. Mueller (with glasses, looking toward left), Associate Administrator, Office of Manned Space Flight, NASA Headquarters. Former astronaut John H. Glenn Jr. is standing behind Mr. Low.

  11. 49. Environmental equipment room, cbr filter at left, ventilation control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Environmental equipment room, cbr filter at left, ventilation control panel in center, brine chiller controls at right, looking southeast - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  12. Documentation of new mission control center White Flight Control Room (FLCR)

    NASA Image and Video Library

    1995-06-06

    Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).

  13. An integrated system for dynamic control of auditory perspective in a multichannel sound field

    NASA Astrophysics Data System (ADS)

    Corey, Jason Andrew

    An integrated system providing dynamic control of sound source azimuth, distance and proximity to a room boundary within a simulated acoustic space is proposed for use in multichannel music and film sound production. The system has been investigated, implemented, and psychoacoustically tested within the ITU-R BS.775 recommended five-channel (3/2) loudspeaker layout. The work brings together physical and perceptual models of room simulation to allow dynamic placement of virtual sound sources at any location of a simulated space within the horizontal plane. The control system incorporates a number of modules including simulated room modes, "fuzzy" sources, and tracking early reflections, whose parameters are dynamically changed according to sound source location within the simulated space. The control functions of the basic elements, derived from theories of perception of a source in a real room, have been carefully tuned to provide efficient, effective, and intuitive control of a sound source's perceived location. Seven formal listening tests were conducted to evaluate the effectiveness of the algorithm design choices. The tests evaluated: (1) loudness calibration of multichannel sound images; (2) the effectiveness of distance control; (3) the resolution of distance control provided by the system; (4) the effectiveness of the proposed system when compared to a commercially available multichannel room simulation system in terms of control of source distance and proximity to a room boundary; (5) the role of tracking early reflection patterns on the perception of sound source distance; (6) the role of tracking early reflection patterns on the perception of lateral phantom images. The listening tests confirm the effectiveness of the system for control of perceived sound source distance, proximity to room boundaries, and azimuth, through fine, dynamic adjustment of parameters according to source location. All of the parameters are grouped and controlled together to create a perceptually strong impression of source location and movement within a simulated space.

  14. Compact CH 4 sensor system based on a continuous-wave, low power consumption, room temperature interband cascade laser

    DOE PAGES

    Dong, Lei; Li, Chunguang; Sanchez, Nancy P.; ...

    2016-01-05

    A tunable diode laser absorption spectroscopy-based methane sensor, employing a dense-pattern multi-pass gas cell and a 3.3 µm, CW, DFB, room temperature interband cascade laser (ICL), is reported. The optical integration based on an advanced folded optical path design and an efficient ICL control system with appropriate electrical power management resulted in a CH 4 sensor with a small footprint (32 x 20 x 17 cm 3) and low-power consumption (6 W). Polynomial and least-squares fit algorithms are employed to remove the baseline of the spectral scan and retrieve CH 4 concentrations, respectively. An Allan-Werle deviation analysis shows that themore » measurement precision can reach 1.4 ppb for a 60 s averaging time. Continuous measurements covering a seven-day period were performed to demonstrate the stability and robustness of the reported CH 4 sensor system.« less

  15. Compact CH 4 sensor system based on a continuous-wave, low power consumption, room temperature interband cascade laser

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dong, Lei; Li, Chunguang; Sanchez, Nancy P.

    A tunable diode laser absorption spectroscopy-based methane sensor, employing a dense-pattern multi-pass gas cell and a 3.3 µm, CW, DFB, room temperature interband cascade laser (ICL), is reported. The optical integration based on an advanced folded optical path design and an efficient ICL control system with appropriate electrical power management resulted in a CH 4 sensor with a small footprint (32 x 20 x 17 cm 3) and low-power consumption (6 W). Polynomial and least-squares fit algorithms are employed to remove the baseline of the spectral scan and retrieve CH 4 concentrations, respectively. An Allan-Werle deviation analysis shows that themore » measurement precision can reach 1.4 ppb for a 60 s averaging time. Continuous measurements covering a seven-day period were performed to demonstrate the stability and robustness of the reported CH 4 sensor system.« less

  16. Applying science and strategy to operating room workforce management.

    PubMed

    Butler, Victoria; Clinton, Christopher; Sagi, Harsha K; Kenney, Robert; Barsoum, Wael K

    2012-01-01

    The traditional means of planning nurse staffing for operating rooms are either poorly translated to the setting or do not provide decision makers with a platform to defend their needs, especially in an era of health care reform. The surgical operations department of the Cleveland Clinic initiated a quality improvement project aimed at applying a scientific method to operating room staffing. One goal was to provide a defensible plan for allocating direct caregiver positions. A second goal was to provide a quick and easy way for nurse managers and directors to track positions and graphically depict the effect of vacancies and orientation on their staffing budgets. Using an objective, scientific method allows position requests to be approved quickly and allows managers to feel much more comfortable functioning in a "lean" mode because they know needed positions will be approved quickly. Managers and directors also have found that graphically depicting numbers of vacant positions, as well as staff in orientation, could quickly relate a story visually rather than getting "bogged down" in narrative (often losing finance administrators along the way).

  17. [Perioperative and postoperative management of two patients with uncontrolled hyperthyroidism using short acting beta blocker, landiolol].

    PubMed

    Fujita, Yasuki; Shimizu, Tomoaki; Matsumoto, Atsuhiro; Aoki, Motoaki

    2008-09-01

    Thyroid storm, sudden onset of life-threatening manifestations of hyperthyroidism, often appears during and after surgery in patients with uncontrolled hyperthyroidism. We report perioperative and postoperative management of two such cases with uncontrolled hyperthyroidism. The first patient is a 41-year-old man with a past history of uncontrolled Graves disease, and was scheduled for emergency video-assisted thoracoscopic surgery for spontaneous pneumothorax. The second patient is a 25-year-old man with a past history of hypertension, and was scheduled for open reduction and internal fixation for mandibular fracture. In both patients, tachycardia and hypertension were observed at admission to the operating room. Therapy included the use of landiolol infusion, a short acting beta blocker, for control of tachycardia. Heart rate was controlled around 90 beats x min(-1) using landiolol during surgery. In each case, landiolol was administered until they can take long acting beta blocker and antithyroid drug orally. In the postoperative period, delirium appeared for a few hours in the first case, but no severe complications were observed in each case. Short acting beta blocker was useful for control of tachycardia in the perioperative and postoperative management of the patient with uncontrolled hyperthyroidism.

  18. The effect of working in an infection isolation room on hospital nurses' job satisfaction.

    PubMed

    Kagan, Ilya; Fridman, Shoshana; Shalom, Esther; Melnikov, Semyon

    2018-03-01

    To examine how the nature of working in a carbapenemase-producing Klebsiella pneumoniae infection isolation room affects nurses' job performance and job satisfaction. Job satisfaction is under intensive research as a factor in the retention of nursing staff. In a cross-sectional design study, a convenience sample of 87 registered nurses who had worked in carbapenemase-producing Klebsiella pneumoniae isolation rooms in a tertiary medical centre in Israel answered a self-administered questionnaire. Data were analysed by descriptive statistics, Pearson correlation coefficients, t tests, one-way ANOVA and multiple regression analysis. Job satisfaction was significantly correlated with perceived knowledge of carbapenemase-producing Klebsiella pneumoniae, with personal experience of working in an isolation room and the perceived level of professional functioning. Multiple regression analysis found that the quality of the nurses' personal experience of isolation room work and their perceived level of professional functioning there explained 33% of the variance in job satisfaction. Managers need to take into account that prolonged work in isolation can negatively impinge upon both performance and job satisfaction. Managers can consider refraining from lengthy nurse assignment to the isolation room. This would also apply to other areas of nursing practice where work is performed in isolation. © 2017 John Wiley & Sons Ltd.

  19. [Febrile neutropenia in cancer patients: management in the emergency room].

    PubMed

    Rivera-Salgado, Daniel; Valverde-Muñoz, Kathia; Ávila-Agüero, María L

    Febrile neutropenia is a life-threatening condition that requires immediate attention, especially in patients with chemotherapy-related neutropenia. Patients with febrile neutropenia have a much greater risk of developing bacterial disease, and fever may be the only indicator of severe bacterial infection. Adequate management of febrile neutropenia emphasizes early recognition of patients, risk stratification, and antibiotic therapy administration during the first 60 minutes of admission to an emergency room. Not all children with febrile neutropenia carry the same risk of morbidity and mortality, so in recent years, efforts have been made to distinguish between high-risk patients where more aggressive hospital management is required. In children classified as low-risk, outpatient management may be considered initially or after 72 hours, whilst high-risk patients should be hospitalized and managed with parenteral antibiotics.

  20. The influence of environmental conditions on safety management in hospitals: a qualitative study.

    PubMed

    Alingh, Carien W; van Wijngaarden, Jeroen D H; Huijsman, Robbert; Paauwe, Jaap

    2018-05-02

    Hospitals are confronted with increasing safety demands from a diverse set of stakeholders, including governmental organisations, professional associations, health insurance companies, patient associations and the media. However, little is known about the effects of these institutional and competitive pressures on hospital safety management. Previous research has shown that organisations generally shape their safety management approach along the lines of control- or commitment-based management. Using a heuristic framework, based on the contextually-based human resource theory, we analysed how environmental pressures affect the safety management approach used by hospitals. A qualitative study was conducted into hospital care in the Netherlands. Five hospitals were selected for participation, based on organisational characteristics as well as variation in their reputation for patient safety. We interviewed hospital managers and staff with a central role in safety management. A total of 43 semi-structured interviews were conducted with 48 respondents. The heuristic framework was used as an initial model for analysing the data, though new codes emerged from the data as well. In order to ensure safe care delivery, institutional and competitive stakeholders often impose detailed safety requirements, strong forces for compliance and growing demands for accountability. As a consequence, hospitals experience a decrease in the room to manoeuvre. Hence, organisations increasingly choose a control-based management approach to make sure that safety demands are met. In contrast, in case of more abstract safety demands and an organisational culture which favours patient safety, hospitals generally experience more leeway. This often results in a stronger focus on commitment-based management. Institutional and competitive conditions as well as strategic choices that hospitals make have resulted in various combinations of control- and commitment-based safety management. A balanced approach is required. A strong focus on control-based management generates extrinsic motivation in employees but may, at the same time, undermine or even diminish intrinsic motivation to work on patient safety. Emphasising commitment-based management may, in contrast, strengthen intrinsic motivation but increases the risk of priorities being set elsewhere. Currently, external pressures frequently lead to the adoption of control-based management. A balanced approach requires a shift towards more trust-based safety demands.

  1. 11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along west wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  2. 29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND VIEWING WINDOW IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  3. 8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  4. SMC Message Browser Projects

    NASA Technical Reports Server (NTRS)

    Wichmann, Benjamin C.

    2013-01-01

    I work directly with the System Monitoring and Control (SMC) software engineers who develop, test and release custom and commercial software in support of the Kennedy Space Center Spaceport Command and Control System. (SCCS). SMC uses Commercial Off-The-Shelf (COTS) Enterprise Management Systems (EMS) software which provides a centralized subsystem for configuring, monitoring, and controlling SCCS hardware and software used in the Control Rooms. There are multiple projects being worked on using the COTS EMS software. I am currently working with the HP Operations Manager for UNIX (OMU) software which allows Master Console Operators (MCO) to access, view and interpret messages regarding the status of the SCCS hardware and software. The OMU message browser gets cluttered with messages which can make it difficult for the MCO to manage. My main project involves determining ways to reduce the number of messages being displayed in the OMU message browser. I plan to accomplish this task in two different ways: (1) by correlating multiple messages into one single message being displayed and (2) to create policies that will determine the significance of each message and whether or not it needs to be displayed to the MCO. The core idea is to lessen the number of messages being sent to the OMU message browser so the MCO can more effectively use it.

  5. Emergency management and infection control in a radiology department during an outbreak of severe acute respiratory syndrome.

    PubMed

    Lin, Y C; Dong, S L; Yeh, Y H; Wu, Y S; Lan, G Y; Liu, C M; Chu, T C

    2005-07-01

    The World Health Organization classified Taiwan as a serious epidemic-stricken area when the extent of severe acute respiratory syndrome (SARS) in Taiwan became clear. As of 11 July 2003, 671 probable SARS cases had been identified in Taiwan and 7 healthcare workers had died from the disease. Radiographers were easily infected by SARS because they had close contact with suspected or probable cases while conducting chest X-ray examinations. Three radiographers had been infected by the end of May 2003. Because of the impact of SARS on the Radiology Department, the department established a SARS emergency infection control team and re-designed the department's infection-control and emergency-management procedures based on the concept of risk-grade protection. This effort included installing a radiographic room at the fever-screening station, re-allocating human resources in the Radiology Department, training the department staff in infection control, and drafting new operational procedures for radiographers conducting X-ray examinations on SARS patients. The goal of this program was to reduce the infection rate and distribute materials efficiently in the department. This article introduces the emergency-management procedure of the Radiology Department during the SARS outbreak and the infection-protection experience of the department staff.

  6. Remote home management for chronic kidney disease: A systematic review.

    PubMed

    He, Ting; Liu, Xing; Li, Ying; Wu, Qiaoyu; Liu, Meilin; Yuan, Hong

    2017-01-01

    Background Remote home management is a new healthcare model that uses information technology to enhance patients' self-management of disease in a home setting. This study is designed to identify the effects of remote home management on patients with chronic kidney disease (CKD). Methods A comprehensive search of PubMed, MEDLINE, Embase, and the Cochrane Central Register of Controlled Trials was performed in January 2015. The reference listings of the included articles in this review were also manually examined. Randomized controlled trials (RCTs) designed to evaluate the effects of remote home management on patients with CKD were included. Results Eight trials were identified. The results of this study suggest that the quality of life (QOL) enabled by remote home management was higher than typical care in certain dimensions. However, the effects of remote home management on blood pressure (BP) remain inconclusive. The studies that assessed health service utilization demonstrated a significant decrease in hospital readmission, emergency room visits, and number of days in the hospital. Another favorable result of this study is that regardless of their gender, age or nationality, patients tend to comply with remote home management programs and the use of related technologies. Conclusions The available data indicate that remote home management may be a novel and effective disease management strategy for improving CKD patients' QOL and influencing their attitudes and behaviors. And, relatively little is known about BP and cost-effectiveness, so future research should focus on these two aspects for the entire population of patients with CKD.

  7. Postpartum hemorrhage in a Jehovah's Witness patient controlled with Tisseel, tranexamic acid, and recombinant factor VIIa.

    PubMed

    Arab, Tarek Samir; Al-Wazzan, Ahmad Bakr; Maslow, Ken

    2010-10-01

    The management of a patient refusing blood transfusion who subsequently experiences a severe postpartum hemorrhage is a particular clinical challenge. A 30-year-old nulliparous patient (who was a Jehovah's Witness) had labour induced for post-dates at 41+4 weeks' gestational age after an uncomplicated pregnancy. She delivered by Caesarean section for dystocia and suspected chorioamnionitis, and subsequently developed postpartum hemorrhage that required management with oxytocin, ergometrine, carboprost, uterine artery ligation, and Hayman compression sutures. The patient ultimately required two additional visits to the operating room, culminating in hysterectomy. Use of tranexamic acid, recombinant factor VIIa, and Tisseel was instrumental in halting the ongoing hemorrhage. Optimal management of a patient refusing administration of blood products requires a multidisciplinary approach as well as a combination of traditional and novel therapies.

  8. LOFT. Interior, control room in control building (TAN630). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  9. Longitudinal Trajectories of Metabolic Control across Adolescence: Associations with Parental Involvement, Adolescents’ Psychosocial Maturity, and Health Care Utilization

    PubMed Central

    King, Pamela S.; Berg, Cynthia A.; Butner, Jonathan; Drew, Linda M.; Foster, Carol; Donaldson, David; Murray, Mary; Swinyard, Michael; Wiebe, Deborah J.

    2012-01-01

    Purpose To predict trajectories of metabolic control across adolescence from parental involvement and adolescent psychosocial maturity, and to link metabolic control trajectories to health care utilization. Methods 252 adolescents (M age at study initiation = 12.5, SD=1.5, range 10–14 years) with type 1 diabetes (54.4% female, 92.8% Caucasian, length of diagnosis M=4.7 years, SD=3.0, range 1–12) participated in a 2-year longitudinal study. Metabolic control was gathered from medical records every three months. Adolescents completed measures of self-reliance (functional autonomy and extreme peer orientation), self-control (self-control and externalizing behavior), and parental involvement in diabetes care (acceptance, monitoring, and frequency of help). At the end of the study, mothers reported health care utilization (diabetes-related emergency room visits and hospitalizations) over the past six months. Results Latent class growth analyses indicated two distinct trajectories of metabolic control across adolescence: moderate control with slight deterioration (92% of the sample; average HbA1c = 8.18%) and poor control with rapid deterioration (8% of the sample; average HbA1c of 12.09%). Adolescents with poor and rapidly deteriorating metabolic control reported lower paternal monitoring and frequency of help with diabetes management, lower functional autonomy, and lower self-control than others. Those with poor and rapidly deteriorating metabolic control were 6.4 times more likely to report diabetes-related emergency room visits, and 9.3 times more likely to report diabetes-related hospitalizations near the end of the study. Conclusions Parental involvement and adolescents’ psychosocial maturity predict patterns of deteriorating metabolic control across adolescence and could be targeted for intervention. PMID:22525113

  10. Managing Acute Behavioural Disturbances in the Emergency Department Using the Environment, Policies and Practices: A Systematic Review.

    PubMed

    Weiland, Tracey J; Ivory, Sean; Hutton, Jennie

    2017-06-01

    Effective strategies for managing acute behavioural disturbances (ABDs) within emergency departments (EDs) are needed given their rising occurrence and negative impact on safety, psychological wellbeing, and staff turnover. Non-pharmacological interventions for ABD management generally fall into four categories: environmental modifications; policies; practice changes; and education. Our objective was to systematically review the efficacy of strategies for ABD management within EDs that involved changes to environment, architecture, policy and practice. We performed systematic searches of CINAHL Plus with Full Text, PsycINFO, MEDLINE, and EMBASE, as well as reference lists of relevant review articles to identify relevant studies published between January 1985 - April 2016. We included studies written in English, which reported management of behavioural disturbances in adults associated with the ED through the use of environmental modifiers (including seclusion, restraint, specialised rooms, architectural changes), policy, and practice-based interventions excepting education-only interventions. Efficacy outcomes of interest included incidence, severity, and duration of ABD, incidence of injuries, staff absenteeism, restraint use, restraint duration, and staff and patient perceptions. Two reviewers independently screened titles and abstracts, and assessed the relevancy and eligibility of studies based on full-text articles. Two authors independently appraised included studies. A narrative synthesis of findings was undertaken. Studies reporting interventions for managing ABDs within the ED are limited in number and quality. The level of evidence for efficacy is low, requiring caution in conclusions. While there is preliminary evidence for environmental change in the form of specialised behavioural rooms, security upgrades and ED modifications, these are not supported by evidence from controlled studies. Many of these "common sense" environmental changes recommended in many guidelines have been widely implemented in EDs. There is an unambiguous gap in the literature regarding the efficacy of interventions for ABD management in EDs involving environmental, policy or practice-based changes. With growing demand on EDs, and with increasing numbers of ABDs, identification of robust evidence-based interventions for safe and effective ABD management is vital.

  11. 78 FR 7465 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ..., and applicants for facility (i.e., nuclear power and non-power research and test reactor) operating... the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North...

  12. 41 CFR 301-11.32 - May I be reimbursed for an advance room deposit in situations where a lodging facility requires...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES ALLOWABLE... such a deposit is required by the lodging facility to secure a room reservation, prior to the beginning...

  13. 41 CFR 301-11.32 - May I be reimbursed for an advance room deposit in situations where a lodging facility requires...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES ALLOWABLE... such a deposit is required by the lodging facility to secure a room reservation, prior to the beginning...

  14. 41 CFR 301-11.32 - May I be reimbursed for an advance room deposit in situations where a lodging facility requires...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES ALLOWABLE... such a deposit is required by the lodging facility to secure a room reservation, prior to the beginning...

  15. Information Foraging in Nuclear Power Plant Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R.L. Boring

    2011-09-01

    nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators tomore » appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.« less

  16. A Simple Graphical Method for Quantification of Disaster Management Surge Capacity Using Computer Simulation and Process-control Tools.

    PubMed

    Franc, Jeffrey Michael; Ingrassia, Pier Luigi; Verde, Manuela; Colombo, Davide; Della Corte, Francesco

    2015-02-01

    Surge capacity, or the ability to manage an extraordinary volume of patients, is fundamental for hospital management of mass-casualty incidents. However, quantification of surge capacity is difficult and no universal standard for its measurement has emerged, nor has a standardized statistical method been advocated. As mass-casualty incidents are rare, simulation may represent a viable alternative to measure surge capacity. Hypothesis/Problem The objective of the current study was to develop a statistical method for the quantification of surge capacity using a combination of computer simulation and simple process-control statistical tools. Length-of-stay (LOS) and patient volume (PV) were used as metrics. The use of this method was then demonstrated on a subsequent computer simulation of an emergency department (ED) response to a mass-casualty incident. In the derivation phase, 357 participants in five countries performed 62 computer simulations of an ED response to a mass-casualty incident. Benchmarks for ED response were derived from these simulations, including LOS and PV metrics for triage, bed assignment, physician assessment, and disposition. In the application phase, 13 students of the European Master in Disaster Medicine (EMDM) program completed the same simulation scenario, and the results were compared to the standards obtained in the derivation phase. Patient-volume metrics included number of patients to be triaged, assigned to rooms, assessed by a physician, and disposed. Length-of-stay metrics included median time to triage, room assignment, physician assessment, and disposition. Simple graphical methods were used to compare the application phase group to the derived benchmarks using process-control statistical tools. The group in the application phase failed to meet the indicated standard for LOS from admission to disposition decision. This study demonstrates how simulation software can be used to derive values for objective benchmarks of ED surge capacity using PV and LOS metrics. These objective metrics can then be applied to other simulation groups using simple graphical process-control tools to provide a numeric measure of surge capacity. Repeated use in simulations of actual EDs may represent a potential means of objectively quantifying disaster management surge capacity. It is hoped that the described statistical method, which is simple and reusable, will be useful for investigators in this field to apply to their own research.

  17. [OR management - Checklists for OR-design for OR-managers - results of a workshop].

    PubMed

    Bock, Matthias; Steinmeyer-Bauer, Klaus; Schüpfer, Guido

    2014-10-01

    The construction of an operating room (OR) suite represents an important intermediate- and long term investment. The planning process starts with the quantitative estimation of the procedures to be carried out which defines the operative capacity for the life time of the facility. This permits the calculation of the number of ORs and the definition of the resources for the recovery room, the intermediate care and intensive care unit.The projectors should integrate the new facility into workflow, workload and logistics of the entire hospital. The simulation flow of patients and accompanying persons and of the routes of the personnel is helpful for this purpose. Separating structures for outpatients from those for inpatients and avoiding de-centralized rooms helps designing an efficient and safe OR suite.The design of the single ORs should be flexible to permit changes or technical innovations during their use period. Mobile equipment is preferable to permanently installed devices. We consider an expanse of at least 45 m(2) for any location adequate for general ORs. The space requirements are elevated for hybrid ORs and rooms dedicated for robotic surgery.The design of the suite should separate the flow of personnel, patients and logistics. Surgical instruments and their logistics should be standardized. Dedicated locations for a simultaneous preparation of the instrumentation tables permit parallel processing. Thus an adequate capacity of preparation rooms and storage rooms is necessary. Dressing rooms, rest rooms, showers and lounges are important for the working conditions and should be planned in an adequate size and number. © Georg Thieme Verlag Stuttgart · New York.

  18. A comprehensive operating room information system using the Kinect sensors and RFID.

    PubMed

    Nouei, Mahyar Taghizadeh; Kamyad, Ali Vahidian; Soroush, Ahmad Reza; Ghazalbash, Somayeh

    2015-04-01

    Occasionally, surgeons do need various types of information to be available rapidly, efficiently and safely during surgical procedures. Meanwhile, they need to free up hands throughout the surgery to necessarily access the mouse to control any application in the sterility mode. In addition, they are required to record audio as well as video files, and enter and save some data. This is an attempt to develop a comprehensive operating room information system called "Medinav" to tackle all mentioned issues. An integrated and comprehensive operating room information system is introduced to be compatible with Health Level 7 (HL7) and digital imaging and communications in medicine (DICOM). DICOM is a standard for handling, storing, printing, and transmitting information in medical imaging. Besides, a natural user interface (NUI) is designed specifically for operating rooms where touch-less interactions with finger and hand tracking are in use. Further, the system could both record procedural data automatically, and view acquired information from multiple perspectives graphically. A prototype system is tested in a live operating room environment at an Iranian teaching hospital. There are also contextual interviews and usability satisfaction questionnaires conducted with the "MediNav" system to investigate how useful the proposed system could be. The results reveal that integration of these systems into a complete solution is the key to not only stream up data and workflow but maximize surgical team usefulness as well. It is now possible to comprehensively collect and visualize medical information, and access a management tool with a touch-less NUI in a rather quick, practical, and harmless manner.

  19. Internet Protocol Display Sharing Solution for Mission Control Center Video System

    NASA Technical Reports Server (NTRS)

    Brown, Michael A.

    2009-01-01

    With the advent of broadcast television as a constant source of information throughout the NASA manned space flight Mission Control Center (MCC) at the Johnson Space Center (JSC), the current Video Transport System (VTS) characteristics provides the ability to visually enhance real-time applications as a broadcast channel that decision making flight controllers come to rely on, but can be difficult to maintain and costly. The Operations Technology Facility (OTF) of the Mission Operations Facility Division (MOFD) has been tasked to provide insight to new innovative technological solutions for the MCC environment focusing on alternative architectures for a VTS. New technology will be provided to enable sharing of all imagery from one specific computer display, better known as Display Sharing (DS), to other computer displays and display systems such as; large projector systems, flight control rooms, and back supporting rooms throughout the facilities and other offsite centers using IP networks. It has been stated that Internet Protocol (IP) applications are easily readied to substitute for the current visual architecture, but quality and speed may need to be forfeited for reducing cost and maintainability. Although the IP infrastructure can support many technologies, the simple task of sharing ones computer display can be rather clumsy and difficult to configure and manage to the many operators and products. The DS process shall invest in collectively automating the sharing of images while focusing on such characteristics as; managing bandwidth, encrypting security measures, synchronizing disconnections from loss of signal / loss of acquisitions, performance latency, and provide functions like, scalability, multi-sharing, ease of initial integration / sustained configuration, integration with video adjustments packages, collaborative tools, host / recipient controllability, and the utmost paramount priority, an enterprise solution that provides ownership to the whole process, while maintaining the integrity of the latest technological displayed image devices. This study will provide insights to the many possibilities that can be filtered down to a harmoniously responsive product that can be used in today's MCC environment.

  20. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less

  1. 6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape tunnel. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  2. 7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner and entrance to cable tunnel. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA

  3. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  4. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  5. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  6. Wide angle view of the Flight control room of Mission control center

    NASA Image and Video Library

    1984-10-06

    Wide angle view of the flight control room (FCR) of the Mission Control Center (MCC). Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.

  7. Sound-field reproduction in-room using optimal control techniques: simulations in the frequency domain.

    PubMed

    Gauthier, Philippe-Aubert; Berry, Alain; Woszczyk, Wieslaw

    2005-02-01

    This paper describes the simulations and results obtained when applying optimal control to progressive sound-field reproduction (mainly for audio applications) over an area using multiple monopole loudspeakers. The model simulates a reproduction system that operates either in free field or in a closed space approaching a typical listening room, and is based on optimal control in the frequency domain. This rather simple approach is chosen for the purpose of physical investigation, especially in terms of sensing microphones and reproduction loudspeakers configurations. Other issues of interest concern the comparison with wave-field synthesis and the control mechanisms. The results suggest that in-room reproduction of sound field using active control can be achieved with a residual normalized squared error significantly lower than open-loop wave-field synthesis in the same situation. Active reproduction techniques have the advantage of automatically compensating for the room's natural dynamics. For the considered cases, the simulations show that optimal control results are not sensitive (in terms of reproduction error) to wall absorption in the reproduction room. A special surrounding configuration of sensors is introduced for a sensor-free listening area in free field.

  8. Assessment of a short hypnosis in a paediatric operating room in reducing postoperative pain and anxiety: A randomised study.

    PubMed

    Duparc-Alegria, Nathalie; Tiberghien, Karine; Abdoul, Hendy; Dahmani, Souhayl; Alberti, Corinne; Thiollier, Anne-Francoise

    2018-01-01

    To assess the impact of a short hypnotic session on postoperative anxiety and pain in major orthopaedic surgery. Despite specific information given before a scheduled paediatric surgery, perioperative anxiety can become important. Randomised Clinical Study. The study is an open single-centre randomised clinical study comparing a "control" group versus a "hypnosis" group receiving a short hypnosis pre-induction session as additional experimental analgesic procedure. The primary endpoint was the postoperative anxiety, blindly assessed using a visual analogue scale. The study involved 120 children (age 10-18 years). The results showed no difference between control group versus hypnosis group. Twenty-four hours after surgery (Day+1), the patient's anxiety score was not different between control and hypnosis groups (median [Q1-Q3]: 1 [0; 3] vs. 0 [0; 3], respectively, p = .17). Each group experienced a significant decrease in anxiety level between the day before surgery (Day-1) and the day after surgery (Day+1) (median ([Q1-Q3]) difference of the anxiety score: 2 [4; 0] and 2 [4; 0], respectively, p < .0001 in each group). The postoperative pain scores were low and not different between groups (median [Q1-Q3]: 2 [0; 3] in control group vs. 3 [1; 3] in hypnosis group, p = .57). This randomised study on a short hypnosis session performed in the operating room prior to a major surgery showed no difference in postoperative anxiety and pain levels. The decrease in anxiety and pain levels may be due to the addition of nurse pre-operative interviews and optimisation in communication in the operating room. As postoperative anxiety level was low in both control and hypnosis groups, nurse pre-operative interviews and nurse training in hypnosis may contribute to the optimisation of global management and decrease the postoperative anxiety level. © 2017 John Wiley & Sons Ltd.

  9. Microcontroller based automatic temperature control for oyster mushroom plants

    NASA Astrophysics Data System (ADS)

    Sihombing, P.; Astuti, T. P.; Herriyance; Sitompul, D.

    2018-03-01

    In the cultivation of Oyster Mushrooms need special treatment because oyster mushrooms are susceptible to disease. Mushroom growth will be inhibited if the temperature and humidity are not well controlled because temperature and inertia can affect mold growth. Oyster mushroom growth usually will be optimal at temperatures around 22-28°C and humidity around 70-90%. This problem is often encountered in the cultivation of oyster mushrooms. Therefore it is very important to control the temperature and humidity of the room of oyster mushroom cultivation. In this paper, we developed an automatic temperature monitoring tool in the cultivation of oyster mushroom-based Arduino Uno microcontroller. We have designed a tool that will control the temperature and humidity automatically by Android Smartphone. If the temperature increased more than 28°C in the room of mushroom plants, then this tool will turn on the pump automatically to run water in order to lower the room temperature. And if the room temperature of mushroom plants below of 22°C, then the light will be turned on in order to heat the room. Thus the temperature in the room oyster mushrooms will remain stable so that the growth of oyster mushrooms can grow with good quality.

  10. Emotional intelligence in the operating room: analysis from the Boston Marathon bombing.

    PubMed

    Chang, Beverly P; Vacanti, Joshua C; Michaud, Yvonne; Flanagan, Hugh; Urman, Richard D

    2014-01-01

    The Boston Marathon terrorist bombing that occurred on April 15, 2013 illustrates the importance of a cohesive, efficient management for the operating room and perioperative services. Conceptually, emotional intelligence (EI) is a form of social intelligence used by individuals in leadership positions to monitor the feelings and emotions of their team while implementing a strategic plan. To describe the experience of caring for victims of the bombing at a large tertiary care center and provide examples demonstrating the importance of EI and its role in the management of patient flow and overall care. A retrospective review of trauma data was performed. Data regarding patient flow, treatment types, treatment times, and outcomes were gathered from the hospital's electronic tracking system and subsequently analyzed. Analyses were performed to aggregate the data, identify trends, and describe the medical care. Immediately following the bombing, a total of 35 patients were brought to the emergency department (ED) with injuries requiring immediate medical attention. 10 of these patients went directly to the operating room on arrival to the hospital. The first victim was in an operating room within 21 minutes after arrival to the ED. The application of EI in managerial decisions helped to ensure smooth transitions for victims throughout all stages of their perioperative care. EI provided the fundamental groundwork that allowed the operating room manager and nurse leaders to establish the calm and coordinated leadership that facilitated patient care and teamwork.

  11. [Advanced Trauma Life Support (ATLS) in the emergency room. Is it suitable as an SOP?].

    PubMed

    Shafizadeh, S; Tjardes, T; Steinhausen, E; Balke, M; Paffrath, T; Bouillon, B; Bäthis, H

    2010-08-01

    There is clinical evidence that a standardized management of trauma patients in the emergency room improves outcome. ATLS is a training course that teaches a systematic approach to the trauma patient in the emergency room. The aims are a rapid and accurate assessment of the patient's physiologic status, treatment according to priorities, and making decisions on whether the local resources are sufficient for adequate definitive treatment of the patient or if transfer to a trauma center is necessary. Above all it is important to prevent secondary injury, to realize timing as a relevant factor in the initial treatment, and to assure a high standard of care. A standard operating procedure (SOP) exactly regulates the approach to trauma patients and determines the responsibilities of the involved faculties. An SOP moreover incorporates the organizational structure in the treatment of trauma patients as well as the necessary technical equipment and staff requirements. To optimize process and result quality, priorities are in the fields of medical fundamentals of trauma care, education, and fault management. SOPs and training courses increase the process and result quality in the treatment of the trauma patient in the emergency room. These programs should be based on the special demands of the physiology of the trauma as well as the structural specifics of the hospital. ATLS does not equal an SOP but it qualifies as a standardized concept for management of trauma patients in the emergency room.

  12. Towards Socially-Responsible Management of Personal Information in Social Networks

    NASA Astrophysics Data System (ADS)

    Morin, Jean-Henry

    Considering the increasing number of Personal Information (PI) used and shared in our now common social networked interactions, privacy issues, retention and how such information are manages have become important. Most approaches rely on one-way disclaimers and policies, often complex, hard to find and lacking ease of understanding for ordinary users of such common networks. Thus leaving little room for users to actually retain any control how the released information is actually used and managed once it has been put online. Additionally, personal information (PI) may include digital artifacts and contributions for which people would legitimately like to retain some rights over their use and their lifetime. Of particular interest in this category is the notion of the "right to forget" we no longer have control over, given the persistent nature of the Internet and its ability to retain information forever. This paper examines this issue from the point of view of the user and social responsibility, arguing for the need to augment information with an additional set of metadata about its usage and management. We discuss the use of DRM technologies in this context as a possible direction.

  13. Time-motion analysis of clinical nursing documentation during implementation of an electronic operating room management system for ophthalmic surgery.

    PubMed

    Read-Brown, Sarah; Sanders, David S; Brown, Anna S; Yackel, Thomas R; Choi, Dongseok; Tu, Daniel C; Chiang, Michael F

    2013-01-01

    Efficiency and quality of documentation are critical in surgical settings because operating rooms are a major source of revenue, and because adverse events may have enormous consequences. Electronic health records (EHRs) have potential to impact surgical volume, quality, and documentation time. Ophthalmology is an ideal domain to examine these issues because procedures are high-throughput and demand efficient documentation. This time-motion study examines nursing documentation during implementation of an EHR operating room management system in an ophthalmology department. Key findings are: (1) EHR nursing documentation time was significantly worse during early implementation, but improved to a level near but slightly worse than paper baseline, (2) Mean documentation time varied significantly among nurses during early implementation, and (3) There was no decrease in operating room turnover time or surgical volume after implementation. These findings have important implications for ambulatory surgery departments planning EHR implementation, and for research in system design.

  14. Time-Motion Analysis of Clinical Nursing Documentation During Implementation of an Electronic Operating Room Management System for Ophthalmic Surgery

    PubMed Central

    Read-Brown, Sarah; Sanders, David S.; Brown, Anna S.; Yackel, Thomas R.; Choi, Dongseok; Tu, Daniel C.; Chiang, Michael F.

    2013-01-01

    Efficiency and quality of documentation are critical in surgical settings because operating rooms are a major source of revenue, and because adverse events may have enormous consequences. Electronic health records (EHRs) have potential to impact surgical volume, quality, and documentation time. Ophthalmology is an ideal domain to examine these issues because procedures are high-throughput and demand efficient documentation. This time-motion study examines nursing documentation during implementation of an EHR operating room management system in an ophthalmology department. Key findings are: (1) EHR nursing documentation time was significantly worse during early implementation, but improved to a level near but slightly worse than paper baseline, (2) Mean documentation time varied significantly among nurses during early implementation, and (3) There was no decrease in operating room turnover time or surgical volume after implementation. These findings have important implications for ambulatory surgery departments planning EHR implementation, and for research in system design. PMID:24551402

  15. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00575 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  16. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00576 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  17. "Tuberculosis Case Management" Training.

    ERIC Educational Resources Information Center

    Knebel, Elisa; Kolodner, Jennifer

    2001-01-01

    The need to isolated health providers with critical knowledge in tuberculosis (TB) case management prompted the development of "Tuberculosis Case Management" CD-ROM. Features include "Learning Center,""Examination Room," and "Library." The combination of audio, video, and graphics allows participants to…

  18. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  19. 26. A typical outer rod room, or rack room, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. A typical outer rod room, or rack room, showing the racks for the nine horizontal control rods (HCRs) that would be inserted or withdrawn from the pile to control the rate of reaction. In this case, it is the 105-F Reactor in February 1945. The view is looking away from the pile, which is out of the picture on the left. Several of the cooling water hose reels for the rods can be seen at the end of the racks near the wall. D-8323 - B Reactor, Richland, Benton County, WA

  20. KSC-99pp0237

    NASA Image and Video Library

    1999-02-25

    KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test

  1. The ribbon-cutting ceremony unveils the reactivated altitude chamber inside the O&C high bay

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test.

  2. Intrahospital teleradiology from the emergency room

    NASA Astrophysics Data System (ADS)

    Fuhrman, Carl R.; Slasky, B. S.; Gur, David; Lattner, Stefanie; Herron, John M.; Plunkett, Michael B.; Towers, Jeffrey D.; Thaete, F. Leland

    1993-09-01

    Off-hour operations of the modern emergency room presents a challenge to conventional image management systems. To assess the utility of intrahospital teleradiology systems from the emergency room (ER), we installed a high-resolution film digitizer which was interfaced to a central archive and to a workstation at the main reading room. The system was designed to allow for digitization of images as soon as the films were processed. Digitized images were autorouted to both destinations, and digitized images could be laser printed (if desired). Almost real time interpretations of nonselected cases were performed at both locations (conventional film in the ER and a workstation in the main reading room), and an analysis of disagreements was performed. Our results demonstrate that in spite of a `significant' difference in reporting, `clinically significant differences' were found in less than 5% of cases. Folder management issues, preprocessing, image orientation, and setting reasonable lookup tables for display were identified as the main limitations to the systems' routine use in a busy environment. The main limitation of the conventional film was the identification of subtle abnormalities in the bright regions of the film. Once identified on either system (conventional film or soft display), all abnormalities were visible and detectable on both display modalities.

  3. 75 FR 15741 - Information Collection; Request for Public Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... mail sent through the U.S. Postal Service, we encourage respondents to submit comments electronically... Financial Management, Office of Management and Budget, Room 6025, New Executive Office Building, Washington... Federal Financial Management, Office of Management and Budget, (202) 395-3052. The proposed revisions to...

  4. 78 FR 21147 - Renewal of Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... maintaining range improvement projects that enhance or improve livestock grazing management, improve watershed.... Department of the Interior, Bureau of Land Management, 1849 C Street NW., Room 2134LM, Attention: Jean... lands managed by the BLM. Range improvements enhance or improve livestock grazing management, improve...

  5. Closed-Loop Acoustic Control of Reverberant Room for Satellite Environmental Testing

    NASA Astrophysics Data System (ADS)

    Janssens, Karl; Bianciardi, Fabio; Sabbatini, Danilo; Debille, Jan; Carrella, Alex

    2012-07-01

    The full satellite acoustic test is an important milestone in a satellite launch survivability verification campaign. This test is required to verify the satellite’s mechanical design against the high-level acoustic loads induced by the launch vehicle during the atmospheric flight. During the test, the satellite is subjected to a broadband diffuse acoustic field, reproducing the pressure levels observed during launch. The excitation is in most cases provided by a combination of horns for the low frequencies and noise generators for the higher frequencies. Acoustic control tests are commonly performed in reverberant rooms, controlling the sound pressure levels in third octave bands over the specified target spectrum. This paper discusses an automatic feedback control system for acoustic control of large reverberation rooms for satellite environmental testing. The acoustic control system consists of parallel third octave PI (Proportional Integral) feedback controllers that take the reverberation characteristics of the room into consideration. The drive output of the control system is shaped at every control step based on the comparison of the average third octave noise spectrum, measured from a number of microphones in the test room, with the target spectrum. Cross-over filters split the output drive into band- limited signals to feed each of the horns. The control system is realized in several steps. In the first phase, a dynamic process model is developed, including the non-linear characteristics of the horns and the reverberant properties of the room. The model is identified from dynamic experiments using system identification techniques. In the next phase, an adequate control strategy is designed which is capable of reaching the target spectrum in the required time period without overshoots. This control strategy is obtained from model-in-the-loop (MIL) simulations, evaluating the performance of various potential strategies. Finally, the proposed strategy is implemented in real-time and its control performance tested and validated.

  6. Clean room survey and assessment, volume 5, appendix H

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.

  7. Human factors aspects of control room design

    NASA Technical Reports Server (NTRS)

    Jenkins, J. P.

    1983-01-01

    A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

  8. IET. Control room in control building (TAN620). Terminal panels for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET. Control room in control building (TAN-620). Terminal panels for instrumentation wiring. Note alarm horn and emergency light at right edge of view. Cable reel comes from Collier, Pawtucket, RI. Date: February 1955. INEEL negative no. 55-362 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  9. Guidelines on ergonomic aspects of control rooms

    NASA Technical Reports Server (NTRS)

    Mitchell, C. M.; Bocast, A. K.; Stewart, L. J.

    1983-01-01

    The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.

  10. Report: EPA’s Office of Environmental Information Should Improve Ariel Rios and Potomac Yard Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0879, September 26, 2012. The security posture and in-place environmental control review of the computer rooms in the Ariel Rios and Potomac Yard buildings revealed numerous security and environmental control deficiencies.

  11. 20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  12. The heat is on: room temperature affects laboratory equipment--an observational study.

    PubMed

    Butler, Julia M; Johnson, Jane E; Boone, William R

    2013-10-01

    To evaluate the effect of ambient room temperature on equipment typically used in in vitro fertilization (IVF). We set the control temperature of the room to 20 °C (+/-0.3) and used CIMScan probes to record temperatures of the following equipment: six microscope heating stages, four incubators, five slide warmers and three heating blocks. We then increased the room temperature to 26 °C (+/-0.3) or decreased it to 17 °C (+/-0.3) and monitored the same equipment again. We wanted to determine what role, if any, changing room temperature has on equipment temperature fluctuation. There was a direct relationship between room temperature and equipment temperature stability. When room temperature increased or decreased, equipment temperature reacted in a corresponding manner. Statistical differences between equipment were found when the room temperature changed. What is also noteworthy is that temperature of equipment responded within 5 min to a change in room temperature. Clearly, it is necessary to be aware of the affect of room temperature on equipment when performing assisted reproductive procedures. Room and equipment temperatures should be monitored faithfully and adjusted as frequently as needed, so that consistent culture conditions can be maintained. If more stringent temperature control can be achieved, human assisted reproduction success rates may improve.

  13. KSC-2009-2975

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  14. KSC-2009-2976

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  15. 37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA

  16. 78 FR 22345 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... CONTACT: Lisette Voyatzis, Committee Management Officer, 1100 Pennsylvania Ave. NW., Room 529, Washington...-8282. SUPPLEMENTARY INFORMATION: Meetings 1. Date: May 01, 2013 Time: 8:30 a.m. to 5:00 p.m. Room: 315 This meeting will discuss applications for the Institutes for College and University Teachers grant...

  17. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  18. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  19. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  20. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  1. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  2. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  3. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  4. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  5. Nurse Case Management and Housing Interventions Reduce Allergen Exposures: The Milwaukee Randomized Controlled Trial

    PubMed Central

    Breysse, Jill; Wendt, Jean; Dixon, Sherry; Murphy, Amy; Wilson, Jonathan; Meurer, John; Cohn, Jennifer; Jacobs, David E.

    2011-01-01

    Objective We examined the impact of a combination of home environmental interventions and nurse case management services on total settled dust loadings and on allergen concentrations in the homes of asthmatic children. Methods Using a randomized longitudinal controlled trial study design, we randomly assigned homes of asthmatic children in Milwaukee to either a control (n=64) or an intervention (n=57) group. Control group homes received a visual assessment, education, bed/pillow dust mite encasings, and treatment of lead-based paint hazards. The intervention group received these same services plus nurse case management that included tailored, individual asthma action plans, provision of minor home repairs, home cleaning using special vacuuming and wet washing, and integrated pest management. Dust vacuum samples were collected from measured surface areas of floors in the TV room, kitchen, and child's bedroom at baseline and at three-, six-, and 12-month follow-up visits. Dust loading (mass per surface area) is a means of measuring total dust and the total amount of allergen present. Results For the intervention group, geometric mean dust loadings declined significantly from baseline (39 milligrams per square foot [mg/ft2]) to post-intervention (11 mg/ft2) (p<0.001). Baseline dust loading, treatment group, visit, and season were significant predictors of follow-up dust loadings. Mean post-intervention dust loadings were 72% higher in the control group. The total amount of allergen in settled house dust declined significantly following the intervention because total dust loading declined; the concentration of allergens in settled dust did not change significantly. Conclusion The combination of nurse case management and home environmental interventions promotes collaboration between health and housing professionals and is effective in reducing exposures to allergens in settled dust. PMID:21563716

  6. Challenges of pain control and the role of the ambulatory pain specialist in the outpatient surgery setting.

    PubMed

    Vadivelu, Nalini; Kai, Alice M; Kodumudi, Vijay; Berger, Jack M

    2016-01-01

    Ambulatory surgery is on the rise, with an unmet need for optimum pain control in ambulatory surgery centers worldwide. It is important that there is a proportionate increase in the availability of acute pain-management services to match the rapid rise of clinical patient load with pain issues in the ambulatory surgery setting. Focus on ambulatory pain control with its special challenges is vital to achieve optimum pain control and prevent morbidity and mortality. Management of perioperative pain in the ambulatory surgery setting is becoming increasingly complex, and requires the employment of a multimodal approach and interventions facilitated by ambulatory surgery pain specialists, which is a new concept. A focused ambulatory pain specialist on site at each ambulatory surgery center, in addition to providing safe anesthesia, could intervene early once problematic pain issues are recognized, thus preventing emergency room visits, as well as readmissions for uncontrolled pain. This paper reviews methods of acute-pain management in the ambulatory setting with risk stratification, the utilization of multimodal interventions, including pharmacological and nonpharmacological options, opioids, nonopioids, and various routes with the goal of preventing delayed discharge and unexpected hospital admissions after ambulatory surgery. Continued research and investigation in the area of pain management with outcome studies in acute surgically inflicted pain in patients with underlying chronic pain treated with opioids and the pattern and predictive factors for pain in the ambulatory surgical setting is needed.

  7. Acute management and outcome of multiple trauma patients with pelvic disruptions

    PubMed Central

    2012-01-01

    Introduction Data on prehospital and trauma-room fluid management of multiple trauma patients with pelvic disruptions are rarely reported. Present trauma algorithms recommend early hemorrhage control and massive fluid resuscitation. By matching the German Pelvic Injury Register (PIR) with the TraumaRegister DGU (TR) for the first time, we attempt to assess the initial fluid management for different Tile/OTA types of pelvic-ring fractures. Special attention was given to the patient's posttraumatic course, particularly intensive care unit (ICU) data and patient outcome. Methods A specific match code was applied to identify certain patients with pelvic disruptions from both PIR and TR anonymous trauma databases, admitted between 2004 and 2009. From the resulting intersection set, a retrospective analysis was done of prehospital and trauma-room data, length of ICU stay, days of ventilation, incidence of multiple organ dysfunction syndrome (MODS), sepsis, and mortality. Results In total, 402 patients were identified. Mean ISS was 25.9 points, and the mean of patients with ISS ≥16 was 85.6%. The fracture distribution was as follows: 19.7% type A, 29.4% type B, 36.6% type C, and 14.3% isolated acetabular and/or sacrum fractures. The type B/C, compared with type A fractures, were related to constantly worse vital signs that necessitated a higher volume of fluid and blood administration in the prehospital and/or the trauma-room setting. This group of B/C fractures were also related to a significantly higher presence of concomitant injuries and related to increased ISS. This was related to increased ventilation and ICU stay, increased rate of MODS, sepsis, and increased rate of mortality, at least for the type C fractures. Approximately 80% of the dead had sustained type B/C fractures. Conclusions The present study confirms the actuality of traditional trauma algorithms with initial massive fluid resuscitation in the recent therapy of multiple trauma patients with pelvic disruptions. Low-volume resuscitation seems not yet to be accepted in practice in managing this special patient entity. Mechanically unstable pelvic-ring fractures type B/C (according to the Tile/OTA classification) form a distinct entity that must be considered notably in future trauma algorithms. PMID:22913820

  8. 76 FR 78249 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Officer, Office of Management and Budget, 725 17th Street NW., Room 10222, New Executive Office Building... U.S.C. Chapter 35) requires that the Office of Management and Budget (OMB) provide interested..., Privacy, Information and Records Management Services, Office of Management, invites comments on the...

  9. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  10. KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  11. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  12. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  13. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  14. STS-118 Ascent/Entry Flight Control Team in White Flight Control Room (WFCR) with Flight Director Steve Stitch

    NASA Image and Video Library

    2007-07-20

    JSC2007-E-41011 (20 July 2007) --- STS-118 Ascent/Entry flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich (center right) and astronaut Tony Antonelli, spacecraft communicator (CAPCOM), hold the STS-118 mission logo.

  15. Report: EPA’s Radiation and Indoor Environments National Laboratory Should Improve Its Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0847, September 21, 2012.Our review of the security posture and in-place environmental controls of EPA’s Radiation and Indoor Environments National Laboratory computer room disclosed an array of security and environmental control deficiencies.

  16. 28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA

  17. 31. Perimeter acquisition radar building room #318, data storage "racks"; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Perimeter acquisition radar building room #318, data storage "racks"; sign read: M&D controller, logic control buffer, data transmission controller - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  18. Air Cleaning Technologies

    PubMed Central

    2005-01-01

    Executive Summary Objective This health technology policy assessment will answer the following questions: When should in-room air cleaners be used? How effective are in-room air cleaners? Are in-room air cleaners that use combined HEPA and UVGI air cleaning technology more effective than those that use HEPA filtration alone? What is the Plasmacluster ion air purifier in the pandemic influenza preparation plan? The experience of severe acute respiratory syndrome (SARS) locally, nationally, and internationally underscored the importance of administrative, environmental, and personal protective infection control measures in health care facilities. In the aftermath of the SARS crisis, there was a need for a clearer understanding of Ontario’s capacity to manage suspected or confirmed cases of airborne infectious diseases. In so doing, the Walker Commission thought that more attention should be paid to the potential use of new technologies such as in-room air cleaning units. It recommended that the Medical Advisory Secretariat of the Ontario Ministry of Health and Long-Term Care evaluate the appropriate use and effectiveness of such new technologies. Accordingly, the Ontario Health Technology Advisory Committee asked the Medical Advisory Secretariat to review the literature on the effectiveness and utility of in-room air cleaners that use high-efficiency particle air (HEPA) filters and ultraviolet germicidal irradiation (UVGI) air cleaning technology. Additionally, the Ontario Health Technology Advisory Committee prioritized a request from the ministry’s Emergency Management Unit to investigate the possible role of the Plasmacluster ion air purifier manufactured by Sharp Electronics Corporation, in the pandemic influenza preparation plan. Clinical Need Airborne transmission of infectious diseases depends in part on the concentration of breathable infectious pathogens (germs) in room air. Infection control is achieved by a combination of administrative, engineering, and personal protection methods. Engineering methods that are usually carried out by the building’s heating, ventilation, and air conditioning (HVAC) system function to prevent the spread of airborne infectious pathogens by diluting (dilution ventilation) and removing (exhaust ventilation) contaminated air from a room, controlling the direction of airflow and the air flow patterns in a building. However, general wear and tear over time may compromise the HVAC system’s effectiveness to maintain adequate indoor air quality. Likewise, economic issues may curtail the completion of necessary renovations to increase its effectiveness. Therefore, when exposure to airborne infectious pathogens is a risk, the use of an in-room air cleaner to reduce the concentration of airborne pathogens and prevent the spread of airborne infectious diseases has been proposed as an alternative to renovating a HVAC system. Airborne transmission is the spread of infectious pathogens over large distances through the air. Infectious pathogens, which may include fungi, bacteria, and viruses, vary in size and can be dispersed into the air in drops of moisture after coughing or sneezing. Small drops of moisture carrying infectious pathogens are called droplet nuclei. Droplet nuclei are about 1 to 5μm in diameter. This small size in part allows them to remain suspended in the air for several hours and be carried by air currents over considerable distances. Large drops of moisture carrying infectious pathogens are called droplets. Droplets being larger than droplet nuclei, travel shorter distances (about 1 metre) before rapidly falling out of the air to the ground. Because droplet nuclei remain airborne for longer periods than do droplets, they are more amenable to engineering infection control methods than are droplets. Droplet nuclei are responsible for the airborne transmission of infectious diseases such as tuberculosis, chicken pox (varicella), measles (rubeola), and dessiminated herpes zoster, whereas close contact is required for the direct transmission of infectious diseases transmitted by droplets, such as influenza (the flu) and SARS. The Technology In-room air cleaners are supplied as portable or fixed devices. Fixed devices can be attached to either a wall or ceiling and are preferred over portable units because they have a greater degree of reliability (if installed properly) for achieving adequate room air mixing and airflow patterns, which are important for optimal effectiveness. Through a method of air recirculation, an in-room air cleaner can be used to increase room ventilation rates and if used to exhaust air out of the room it can create a negative-pressure room for airborne infection isolation (AII) when the building’s HVAC system cannot do so. A negative-pressure room is one where clean air flows into the room but contaminated air does not flow out of it. Contaminated room air is pulled into the in-room air cleaner and cleaned by passing through a series of filters, which remove the airborne infectious pathogens. The cleaned air is either recirculated into the room or exhausted outside the building. By filtering contaminated room air and then recirculating the cleaned air into the room, an in-room air cleaner can improve the room’s ventilation. By exhausting the filtered air to the outside the unit can create a negative-pressure room. There are many types of in-room air cleaners. They vary widely in the airflow rates through the unit, the type of air cleaning technology used, and the technical design. Crucial to maximizing the efficiency of any in-room air cleaner is its strategic placement and set-up within a room, which should be done in consultation with ventilation engineers, infection control experts, and/or industrial hygienists. A poorly positioned air cleaner may disrupt airflow patterns within the room and through the air cleaner, thereby compromising its air cleaning efficiency. The effectiveness of an in-room air cleaner to remove airborne pathogens from room air depends on several factors, including the airflow rate through the unit’s filter and the airflow patterns in the room. Tested under a variety of conditions, in-room air cleaners, including portable or ceiling mounted units with either a HEPA or a non-HEPA filter, portable units with UVGI lights only, or ceiling mounted units with combined HEPA filtration and UVGI lights, have been estimated to be between 30% and 90%, 99% and 12% and 80% effective, respectively. However, and although their effectiveness is variable, the United States Centers for Disease Control and Prevention has acknowledged in-room air cleaners as alternative technology for increasing room ventilation when this cannot be achieved by the building’s HVAC system with preference given to fixed recirculating systems over portable ones. Importantly, the use of an in-room air cleaner does not preclude either the need for health care workers and visitors to use personal protective equipment (N95 mask or equivalent) when entering AII rooms or health care facilities from meeting current regulatory requirements for airflow rates (ventilation rates) in buildings and airflow differentials for effective negative-pressure rooms. The Plasmacluster ion technology, developed in 2000, is an air purification technology. Its manufacturer, Sharp Electronics Corporation, says that it can disable airborne microorganisms through the generation of both positive and negative ions. (1) The functional unit is the hydroxyl, which is a molecule comprised of one oxygen molecule and one hydrogen atom. Plasmacluster ion air purifier uses a multilayer filter system composed of a prefilter, a carbon filter, an antibacterial filter, and a HEPA filter, combined with an ion generator to purify the air. The ion generator uses an alternating plasma discharge to split water molecules into positively and negatively charged ions. When these ions are emitted into the air, they are surrounded by water molecules and form cluster ions which are attracted to airborne particles. The cluster ion surrounds the airborne particle, and the positive and negative ions react to form hydroxyls. These hydroxyls steal the airborne particle’s hydrogen atom, which creates a hole in the particle’s outer protein membrane, thereby rendering it inactive. Because influenza is primarily acquired by large droplets and direct and indirect contact with an infectious person, any in-room air cleaner will have little benefit in controlling and preventing its spread. Therefore, there is no role for the Plasmacluster ion air purifier or any other in-room air cleaner in the control of the spread of influenza. Accordingly, for purposes of this review, the Medical Advisory Secretariat presents no further analysis of the Plasmacluster. Review Strategy The objective of the systematic review was to determine the effectiveness of in-room air cleaners with built in UVGI lights and HEPA filtration compared with those using HEPA filtration only. The Medical Advisory Secretariat searched the databases of MEDLINE, EMBASE, Cochrane Database of Systematic Reviews, INAHATA (International Network of Agencies for Health Technology Assessment), Biosis Previews, Bacteriology Abstracts, Web of Science, Dissertation Abstracts, and NIOSHTIC 2. A meta-analysis was conducted if adequate data was available from 2 or more studies and where statistical and clinical heterogeneity among studies was not an issue. Otherwise, a qualitative review was completed. The GRADE system was used to summarize the quality of the body of evidence comprised of 1 or more studies. Summary of Findings There were no existing health technology assessments on air cleaning technology located during the literature review. The literature search yielded 59 citations of which none were retained. One study was retrieved from a reference list of a guidance document from the United States Centers for Disease Control and Prevention, which evaluated an in-room air cleaner with combined UVGI lights and HEPA filtration under 2 conditions: UVGI lights on and UVGI lights off. Experiments were performed using different ventilation rates and using an aerosolized pathogen comprised of Mycobaterium parafortuitum, a surrogate for the bacterium that causes tuberculosis. Effectiveness was measured as equivalent air changes per hour (eACH). This single study formed the body of evidence for our systematic review research question. Experimental Results The eACH rate for the HEPA-UVGI in-room air cleaner was statistically significantly greater when the UV lights were on compared with when the UV lights were off. (P < .05). However, subsequent experiments could not attribute this to the UVGI. Consequently, the results are inconclusive and an estimate of effect (benefit) is uncertain. The study was reviewed by a scientific expert and rated moderate for quality. Further analysis determined that there was some uncertainty in the directness of the outcome measure (eACH); thus, the GRADE level for the quality of the evidence was low indicating that an estimate of effect is very uncertain. There is uncertainty in the benefits of using in-room air cleaners with combined UVGI lights and HEPA filtration over systems that use HEPA filtration alone. However, there are no known risks to using systems with combined UVGI and HEPA technology compared with those with HEPA alone. There is an increase in the burden of cost including capital costs (cost of the device), operating costs (electricity usage), and maintenance costs (cleaning and replacement of UVGI lights) to using an in-room air cleaner with combined UVGI and HEPA technology compared with those with HEPA alone. Given the uncertainty of the estimate of benefits, an in-room air cleaner with HEPA technology only may be an equally reasonable alternative to using one with combined UVGI and HEPA technology Conclusions In-room air cleaners may be used to protect health care staff from air borne infectious pathogens such as tuberculosis, chicken pox, measles, and dessiminated herpes zoster. In addition, and although in-room air cleaners are not effective at protecting staff and preventing the spread of droplet-transmitted diseases such as influenza and SARS, they may be deployed in situations with a novel/emerging infectious agent whose epidemiology is not yet defined and where airborne transmission is suspected. It is preferable that in-room air cleaners be used with a fixed and permanent room placement when ventilation requirements must be improved and the HVAC system cannot be used. However, for acute (temporary) situations where a novel/emerging infectious agent presents whose epidemiology is not yet defined and where airborne transmission is suspected it may be prudent to use the in room air cleaner as a portable device until mode of transmission is confirmed. To maximize effectiveness, consultation with an environmental engineer and infection control expert should be undertaken before using an in-room air cleaner and protocols for maintenance and monitoring of these devices should be in place. If properly installed and maintained, in room air cleaners with HEPA or combined HEPA and UVGI air cleaning technology are effective in removing airborne pathogens. However, there is only weak evidence available at this time regarding the benefit of using an in-room air cleaner with combined HEPA and UVGI air cleaner technology instead of those with HEPA filter technology only. PMID:23074468

  19. KSC-2013-3235

    NASA Image and Video Library

    2013-08-09

    CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang

  20. The Current State of Middle Management Preparation, Training, and Development in Academic Libraries

    ERIC Educational Resources Information Center

    Rooney, Michael P.

    2010-01-01

    This study examined the management experience, preparation, and training possessed by middle managers in academic libraries through the analysis of survey results. The analysis showed both advances in middle management preparation over recent decades and room for improvement in several aspects of management development and training within the…

  1. A SUMMARY COMPARISON OF DESIGN EVALUATION TECHNIQUES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spielman, Zachary; Hill, Rachael

    The United States’ fleet of Nuclear Reactors is considering modernizing their control rooms and instrumentation as an effort to avoid component obsolescence, keep up with competing industries, and cater to a new work force among others. Multiple technologies have potential to improve the control room. In attempts to evaluate the available options researchers employ a variety of measures to ensure the best candidate is used in a modernizing effort. The NRC is in charge of ensuring any new design has been thoroughly vetted before approving a license. Laid out in NUREG-0711 “Human Factors Engineering Program Review Model” is the reviewmore » criteria for design validation. As there are a variety of measures currently used to evaluate candidate technologies, this paper seeks to identify weaknesses in the common measures used to design and validate technology in control room modernization efforts. Identifying where measurements are not meeting the criteria will help the control room modernization research platform identify where measurement development needs to occur. This will help ensure that current performance measurements are producing as reliable results as possible to select the right technology to integrate into nuclear operating control rooms.« less

  2. Engine Research Building’s Central Control Room

    NASA Image and Video Library

    1948-07-21

    Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  3. 14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. WrightPatterson ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. - Wright-Patterson Air Force Base, Area B, Building No. 20A, Propeller Test Complex, Seventh Street, from E to G Streets, Dayton, Montgomery County, OH

  4. 16. View of Building 100 control room. 1987. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. IET control building (TAN620). interior room. sign says, "emergency equipment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). interior room. sign says, "emergency equipment for metal fires." INEEL negative no. HD-21-1-2 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  6. 40 CFR 62.15105 - Who must complete the operator training course? By when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...

  7. 40 CFR 62.15105 - Who must complete the operator training course? By when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...

  8. Virtual Project Rooms for Education in Engineering

    ERIC Educational Resources Information Center

    van Vliet, Rudolf G.; Roeling, Monika M.; de Graaff, Rick; Pilot, Albert

    2004-01-01

    Virtual project rooms (VPRs) may support collaborative project-based learning groups by facilitating project management, documentation and communication. In this study a set of experiments was carried out at Eindhoven University of Technology using the MS Outlook/Exchange software as a groupware platform for design-oriented group projects. The…

  9. ITTALKS: A Case Study in the Semantic Web and DAML

    DTIC Science & Technology

    2005-01-01

    For example, a Centaurus room manager agent [26] could watch ITTALKS for events happening in a room for which it is responsible in order to enable...01), Montreal, Quebec, Canada, May 29 2001. [26] Lalana Kagal, Vlad Korolev, Harry Chen, Anupam Joshi, and Timothy Finin. Centaurus : A framework for

  10. The ICCB MIS Facility Inventory & Utilization Users Handbook.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    This handbook is designed to assist community college administrators in using the various reports generated by the facility inventory and utilization subsystem of the Illinois Community College Board management information system. Among the reports generated by the subsystem are: room utilization report, campus classroom usage report, room use…

  11. 78 FR 22562 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... submit an information collection request to the Office of Management and Budget (OMB) and solicitation of... fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB...

  12. 78 FR 35329 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... action to submit an information collection request to the Office of Management and Budget (OMB) and... fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB...

  13. 78 FR 34134 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... action to submit an information collection request to the Office of Management and Budget (OMB) and... fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB...

  14. Locker Room Maintenance Made Easy.

    ERIC Educational Resources Information Center

    Theel, James

    1998-01-01

    Provides examples on ways to make locker room maintenance easier and their use more student-friendly. Improvements include use of indoor-outdoor carpeting with numerous floor drains to cut mildew buildup, adequate ventilation to reduce musty smells, better hot water management, ceramic tiles to reduce water-damage repair and painting needs, and…

  15. Results of the Medicare Health Support disease-management pilot program.

    PubMed

    McCall, Nancy; Cromwell, Jerry

    2011-11-03

    In the Medicare Modernization Act of 2003, Congress required the Centers for Medicare and Medicaid Services to test the commercial disease-management model in the Medicare fee-for-service program. The Medicare Health Support Pilot Program was a large, randomized study of eight commercial programs for disease management that used nurse-based call centers. We randomly assigned patients with heart failure, diabetes, or both to the intervention or to usual care (control) and compared them with the use of a difference-in-differences method to evaluate the effects of the commercial programs on the quality of clinical care, acute care utilization, and Medicare expenditures for Medicare fee-for-service beneficiaries. The study included 242,417 patients (163,107 in the intervention group and 79,310 in the control group). The eight commercial disease-management programs did not reduce hospital admissions or emergency room visits, as compared with usual care. We observed only 14 significant improvements in process-of-care measures out of 40 comparisons. These modest improvements came at substantial cost to the Medicare program in fees paid to the disease-management companies ($400 million), with no demonstrable savings in Medicare expenditures. In this large study, commercial disease-management programs using nurse-based call centers achieved only modest improvements in quality-of-care measures, with no demonstrable reduction in the utilization of acute care or the costs of care.

  16. Critical event management with geographic information system technology

    NASA Astrophysics Data System (ADS)

    Booth, John F.; Young, Jeffrey M.

    1997-02-01

    Critical event management at the Los Angeles County Regional Criminal Information Clearinghouse (LACRCIC) provides for the deconfliction of operations, such as reverse stings, arrests, undercover buys/busts, searches, surveillances, and site surveys in the Los Angeles, Orange, Riverside, and San Bernardino county area. During these operations, the opportunity for officer-to-officer confrontation is high, possibly causing a worse case scenario -- officers drawing on each other resulting in friendly fire injuries or casualties. In order to prevent local, state, and federal agencies in the Los Angeles area from experiencing this scenario, the LACRCIC provides around the clock critical event management services via its secure war room. The war room maintains a multicounty detailed street-level map base and geographic information system (GIS) application to support this effort. Operations are telephoned in by the participating agencies and posted in the critical event management system by war room analysts. The application performs both a proximity search around the address and a commonality of suspects search. If a conflict is found, the system alerts the analyst by sounding an audible alarm and flashing the conflicting events on the automated basemap. The analyst then notifies the respective agencies of the conflicting critical events so coordination or rescheduling can occur.

  17. PBF Control Building (PER619). Interior detail of control room's severe ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  18. 17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. Control centers design for ergonomics and safety.

    PubMed

    Quintana, Leonardo; Lizarazo, Cesar; Bernal, Oscar; Cordoba, Jorge; Arias, Claudia; Monroy, Magda; Cotrino, Carlos; Montoya, Olga

    2012-01-01

    This paper shows the general design conditions about ergonomics and safety for control centers in the petrochemical process industry. Some of the topics include guidelines for the optimized workstation design, control room layout, building layout, and lighting, acoustical and environmental design. Also takes into account the safety parameters in the control rooms and centers design. The conditions and parameters shown in this paper come from the standards and global advances on this topic on the most recent publications. And also the work was supplemented by field visits of our team to the control center operations in a petrochemical company, and technical literature search efforts. This guideline will be useful to increase the productivity and improve the working conditions at the control rooms.

  20. 12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA

  1. KSC-2009-2977

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – A technician works at installing a new window in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  2. 21. Interior view of citric acid air pollution control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  3. 8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance and inner blast door. - Edwards Air Force Base, South Base Sled Track, Firing & Control Blockhouse for 10,000-foot Track, South of Sled Track at midpoint of 20,000-foot track, Lancaster, Los Angeles County, CA

  4. 82. VIEW OF AIRCONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    82. VIEW OF AIR-CONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF SLC-3E CONTROL ROOM. DIAL ON RIGHT (EAST) PERPENDICULAR WALL IS DIMMER FOR ROOM LIGHTING. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. Clifford Charlesworth seated at his console in Mission Control Room

    NASA Image and Video Library

    1968-12-21

    S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.

  6. 76 FR 50188 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ..., Information and Records Management Services, Office of Management, invites comments on the submission for OMB... Management and Budget, 725 17th Street, NW., Room 10222, New Executive Office Building, Washington, DC 20503... 35) requires that the Office of Management and Budget (OMB) provide interested Federal agencies and...

  7. 77 FR 12040 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ..., Information and Records Management Services, Office of Management, invites comments on the submission for OMB... Management and Budget, 725 17th Street NW., Room 10222, New Executive Office Building, Washington, DC 20503... 35) requires that the Office of Management and Budget (OMB) provide interested Federal agencies and...

  8. 78 FR 8161 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0005; OMB...: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency... comments to Docket Manager, Office of Chief Counsel, DHS/FEMA, 500 C Street SW., Room 835, Washington, DC...

  9. 78 FR 13760 - Proposed Collection of Information: Application Form for U.S. Department of the Treasury Stored...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... U.S. Department of the Treasury Stored Value Card (SVC) Program AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management... written comments to Financial Management Service, Records and Information Management Branch, Room 135...

  10. Method of installing a control room console in a nuclear power plant

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  11. Advanced nuclear plant control room complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  12. 133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM (214), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  16. Integrated intelligent systems in advanced reactor control rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckmeyer, R.R.

    1989-01-01

    An intelligent, reactor control room, information system is designed to be an integral part of an advanced control room and will assist the reactor operator's decision making process by continuously monitoring the current plant state and providing recommended operator actions to improve that state. This intelligent system is an integral part of, as well as an extension to, the plant protection and control systems. This paper describes the interaction of several functional components (intelligent information data display, technical specifications monitoring, and dynamic procedures) of the overall system and the artificial intelligence laboratory environment assembled for testing the prototype. 10 refs.,more » 5 figs.« less

  17. [Regional health systems management: a case study in Rio Grande do Sul, Brazil].

    PubMed

    Lima, Juliano de Carvalho; Rivera, Francisco Javier Uribe

    2006-10-01

    This article analyzes the management system in a health district in the State of Rio Grande do Sul, Brazil, through qualitative analysis, using a case study as the methodology and macro-organization theory as the analytical framework. For the current management system in the 6th Health Region, a clear mission statement and wide acceptance by health workers are facilitating factors for the current organizational practices within the health system. Nevertheless, the way health coordinators are currently prioritizing their time has diverted necessary resources from critical problems towards more remedial issues. The 6th Health Region has encouraged social control (or public oversight) in order to improve accountability. However, there is room for improvement in quality assurance management, since there were no well-defined goals, objectives, or accountability. Decentralized consultancy provided to the municipalities and the funding model itself have both promoted decentralization and autonomy, although the strategy requires better regional integration and greater commitment in managerial practices.

  18. A recovery room-based acute pain service.

    PubMed

    Leykin, Y; Pellis, T; Ambrosio, C; Zanette, G; Malisano, A; Rapotec, A; Casati, A

    2007-04-01

    Despite routine postoperative pain management improves recovery and reduces postoperative morbidity and overall costs, and the availability of a large armamentarium of analgesic techniques and drugs, a significant portion of patients do not receive adequate postoperative pain control. We describe a recovery room (RR) based acute pain service model. Guidelines on postoperative pain and therapeutic protocols were instituted in January 1999. The analgesic endpoint was a visual analogic scale (VAS) below 4 for all surgical patients for the first 48-72 h. The RR, run by one anesthesiologist and 2 nurses and one assistant, acted as a coordination centre. Discharge from the RR was subject to achieving effective analgesia. Nurses of each ward monitored VAS along with vital signs, administered rescue doses if necessary, and reported to the RR nurse when needed. RR nurses monitored the patient at least twice daily and reported to the anesthesiologist. We have distributed an anonymous questionnaire, within surgical wards, to both surgeons and nurses to evaluate their perception of pain management and of this acute pain service (APS) model. VAS was maintained significantly <4. Analgesic drug consumption increased between 1997, 2000 (first year of APS) and 2004. The auditing process confirmed the desire of all professional figures to be informed and involved in acute pain management as part of a coordinated and systematic approach to the surgical patient. A RR-based APS can effectively act as coordinating centre for acute pain treatment without adjunctive personnel.

  19. Dawn Spacecraft Processing

    NASA Image and Video Library

    2007-04-10

    In clean room C of Astrotech's Payload Processing Facility, a worker wearing a "bunny suit," or clean-room attire, begins removing the protective cover surrounding the Dawn spacecraft. In the clean room, the spacecraft will undergo further processing. Dawn's mission is to explore two of the asteroid belt's most intriguing and dissimilar occupants: asteroid Vesta and the dwarf planet Ceres. The Dawn mission is managed by JPL, a division of the California Institute of Technology in Pasadena, for NASA's Science Mission Directorate in Washington, D.C.

  20. Dawn Spacecraft Processing

    NASA Image and Video Library

    2007-04-10

    In clean room C of Astrotech's Payload Processing Facility, a worker wearing a "bunny suit," or clean-room attire, looks over the Dawn spacecraft after removing the protective cover, at bottom right. In the clean room, the spacecraft will undergo further processing. Dawn's mission is to explore two of the asteroid belt's most intriguing and dissimilar occupants: asteroid Vesta and the dwarf planet Ceres. The Dawn mission is managed by JPL, a division of the California Institute of Technology in Pasadena, for NASA's Science Mission Directorate in Washington, D.C.

  1. Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald Boring; Roger Lew; Thomas Ulrich

    2014-03-01

    As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how themore » process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.« less

  2. KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  3. Clown doctors as a treatment for preoperative anxiety in children: a randomized, prospective study.

    PubMed

    Vagnoli, Laura; Caprilli, Simona; Robiglio, Arianna; Messeri, Andrea

    2005-10-01

    The induction of anesthesia is one of the most stressful moments for a child who must undergo surgery: it is estimated that 60% of children suffer anxiety in the preoperative period. Preoperative anxiety is characterized by subjective feelings of tension, apprehension, nervousness, and worry. These reactions reflect the child's fear of separation from parents and home environment, as well as of loss of control, unfamiliar routines, surgical instruments, and hospital procedures. High levels of anxiety have been identified as predictors of postoperative troubles that can persist for 6 months after the procedure. Both behavioral and pharmacologic interventions are available to treat preoperative anxiety in children. The aim of this study was to investigate the effects of the presence of clowns on a child's preoperative anxiety during the induction of anesthesia and on the parent who accompanies him/her until he/she is asleep. The sample was composed of 40 subjects (5-12 years of age) who had to undergo minor day surgery and were assigned randomly to the clown group (N = 20), in which the children were accompanied in the preoperative room by the clowns and a parent, or the control group (N = 20), in which the children were accompanied by only 1 of his/her parents. The anxiety of the children in the preoperative period was measured through the Modified Yale Preoperative Anxiety Scale instrument (observational behavioral checklist to measure the state anxiety of young children), and the anxiety of the parents was measured with the State-Trait Anxiety Inventory (Y-1/Y-2) instrument (self-report anxiety behavioral instrument that measures trait/baseline and state/situational anxiety in adults). In addition, a questionnaire for health professionals was developed to obtain their opinion about the presence of clowns during the induction of anesthesia, and a self-evaluation form was developed to be filled out by the clowns themselves about their interactions with the child. The clown group was significantly less anxious during the induction of anesthesia compared with the control group. In the control group there was an increased level of anxiety in the induction room in comparison to in the waiting room; in the clown group anxiety was not significantly different in the 2 locations. The questionnaire for health professionals indicated that the clowns were a benefit to the child, but the majority of the staff was opposed to continuing the program because of perceived interference with the procedures of the operating room. The correlation between the scores of the form to self-evaluate the effectiveness of the clowns and of the Modified Yale Preoperative Anxiety Scale is significant for both the waiting room and induction room. This study shows that the presence of clowns during the induction of anesthesia, together with the child's parents, was an effective intervention for managing children's and parents' anxiety during the preoperative period. We would encourage the promotion of this form of distraction therapy in the treatment of children requiring surgery, but the resistance of medical personnel make it very difficult to insert this program in the activity of the operating room.

  4. Ornamental indoor plants in hospital rooms enhanced health outcomes of patients recovering from surgery.

    PubMed

    Park, Seong-Hyun; Mattson, Richard H

    2009-09-01

    Clinical trials have not been reported concerning the health benefits of viewing indoor plants on stress and recovery of surgical patients within a hospital setting. Using various medical and psychologic measurements, this study performed a randomized clinical trial with surgical patients to evaluate whether plants in hospital rooms have therapeutic influences. Ninety (90) patients recovering from a hemorrhoidectomy were randomly assigned to either control or plant rooms. With half the patients, live plants were placed in their rooms during postoperative recovery periods. Data collected for each patient included length of hospitalization, analgesics used for postoperative pain control, vital signs, ratings of pain intensity, pain distress, anxiety and fatigue, the State-Trait Anxiety Inventory Form Y-1, the Environmental Assessment Scale, and the Patient's Room Satisfaction Questionnaire. Viewing plants during the recovery period had a positive influence linking directly to health outcomes of surgical patients. Patients in hospital rooms with plants and flowers had significantly more positive physiologic responses evidenced by lower systolic blood pressure, and lower ratings of pain, anxiety, and fatigue than patients in the control room. Patients with plants also felt more positively about their rooms and evaluated them with higher satisfaction when compared with patients in similar rooms without plants. Based on patients' comments, plants brightened up the room environment, reduced stress, and also conveyed positive impressions of hospital employees caring for patients. Findings of this study confirmed the therapeutic value of plants in the hospital environment as a noninvasive, inexpensive, and effective complementary medicine for surgical patients. Health care professionals and hospital administrators need to consider the use of plants and flowers to enhance healing environments for patients.

  5. 78 FR 52782 - Renewal of Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... maintaining range improvement projects that enhance or improve livestock grazing management, improve watershed... Interior, Bureau of Land Management, 1849 C Street NW., Room 2134LM, Attention: Jean Sonneman, Washington... by the BLM. Range improvements enhance or improve livestock grazing management, improve watershed...

  6. 39 CFR 3002.11 - Office of Secretary and Administration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Employment Opportunity Officer for the Commission and manages the Commission's continuity of operations planning. (d) The Office of Secretary and Administration manages the Commission's records, including the... Office of Secretary and Administration manages the Commission's dockets and docket room, Web site...

  7. 39 CFR 3002.11 - Office of Secretary and Administration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Employment Opportunity Officer for the Commission and manages the Commission's continuity of operations planning. (d) The Office of Secretary and Administration manages the Commission's records, including the... Office of Secretary and Administration manages the Commission's dockets and docket room, Web site...

  8. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

  9. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intendedmore » to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.« less

  10. Tuberculosis prevention and control in large jails: a challenge to tuberculosis elimination.

    PubMed

    Roberts, Cheryl A; Lobato, Mark N; Bazerman, Lauri B; Kling, Ryan; Reichard, Audrey A; Hammett, Theodore M

    2006-02-01

    This study assessed the extent to which 20 large jail systems have implemented national recommendations for tuberculosis (TB) prevention and control in correctional facilities. Data were collected through questionnaires to jail medical directors and TB control directors, observation at the jails, and abstraction of medical records of inmates with TB disease and latent TB infection. Twenty percent of jail systems (4/20) had conducted an assessment of risk for TB transmission in their facilities, and 55% (11/20) monitored tuberculin skin test conversions of inmates and staff. Sixty-five percent (13/20) of jails had an aggregate record-keeping system for tracking TB status and treatment, which was usually paper based. Forty-five percent of jails (9/20) had policies to offer HIV counseling and testing to tuberculin skin test-positive patients, and 75% (15/20) screen HIV-infected inmates with chest radiographs. Three quarters of jails (15/20) had policies to always isolate patients with suspected or confirmed pulmonary TB in an airborne infection isolation room. Half of jails with airborne infection isolation rooms (6/12) conformed to Centers for Disease Control and Prevention (CDC) guidelines for monitoring negative pressure. Improvements are needed in conducting TB risk assessments and evaluations to determine priorities and reduce risk of transmission. Inadequate medical information systems are impeding TB control and evaluation efforts. Although HIV infection is the greatest cofactor for development of TB disease, jails have inadequate information on patients' HIV status to make informed decisions in screening and management of TB and latent TB infection. Jails need to improve the use of environmental controls.

  11. 140. Detail of north control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    140. Detail of north control panel in control room, looking north. This panel monitors a variety of activities: gages indicate the level of Lake Tapps and level of the circular forebay; wattmeters indicate output of exciters. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  12. FET. Control and equipment building, TAN630. Main floor plan. Control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FET. Control and equipment building, TAN-630. Main floor plan. Control room. Room numbers and functions. Ralph M. Parsons. 1229-2-ANP/GE-5-630-A-2. Date: March 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 036-0630-00-693-107081 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  13. Perceived Parental Care and Control among Israeli Female Adolescents Presenting to Emergency Rooms after Self-Poisoning

    ERIC Educational Resources Information Center

    Diamond, Gary M.; Didner, Hila; Waniel, Ariela; Priel, Beatriz; Asherov, Jack; Arbel, Shosh

    2005-01-01

    Levels of perceived parental care and control among 24 female Israeli adolescents presenting at emergency rooms after a self-poisoning act of low lethality were compared to those found among 23 non-self-harming, community controls. Adolescents' perceived levels of parental care and control were measured via both adolescents' self-report and…

  14. Mission Operations Control Room (MOCR) activities during STS-6 mission

    NASA Image and Video Library

    1983-04-05

    Astronauts Roy D. Bridges (left) and RIchard O. Covey serve as spacecraft communicators (CAPCOM) for STS-6. They are seated at the CAPCOM console in the mission operations control room (MOCR) of JSC's mission control center (30119); Flight Director Jay H. Greene communicates with a nearby flight controller in the MOCR just after launch of the Challenger (30120).

  15. 5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, SHOWING PUMP MOTOR AND STEEL BULKHEADS IN FLOOR FOR ACCESS TO PUMPS - Providence Sewage Treatment System, Reservoir Avenue Pumping Station, Reservoir & Pontiac Avenues, Providence, Providence County, RI

  16. 68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO TURBINE HALL AT UNITS 3, 5, AND 2) - Delaware County Electric Company, Chester Station, Delaware River at South end of Ward Street, Chester, Delaware County, PA

  17. 8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), FROM ENTRYWAY, LOOKING NORTH, SHOWING ADDITIONAL 'GAMEWELL' FIRE ALARM SYSTEMS. - Oakland Naval Supply Center, Firehouse, East of Fourth Street, between A & B Streets, Oakland, Alameda County, CA

  18. 11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL OF BOEING 737 AT TOP OF PHOTOGRAPH IN FULL-SCALE WIND TUNNEL. - NASA Langley Research Center, Full-Scale Wind Tunnel, 224 Hunting Avenue, Hampton, Hampton, VA

  19. 15. Interior view of unoccupied controlled computer room looking at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior view of unoccupied controlled computer room looking at exit door and office; northwest corner of unoccupied portion; view to south. - Ellsworth Air Force Base, Mess & Administration Building, 2279 Risner Drive, Blackhawk, Meade County, SD

  20. Monitoring persistence of the entomopathogenic fungus Metarhizium anisopliae under simulated field conditions with the aim of controlling adult Aedes aegypti (Diptera: Culicidae)

    PubMed Central

    2014-01-01

    Background Entomopathogenic fungi are potential candidates for use in integrated vector management, with recent emphasis aimed at developing adult mosquito control methods. Here we investigated the persistence of the fungus Metarhizium anisopliae when tested against female A. aegypti under field conditions. Methods Black cotton cloths impregnated with M. anisopliae conidia, formulated in vegetable oil + isoparaffin, were maintained on a covered veranda for up to 30 days. At specific times, pieces of the cloths were removed, placed in Tween 80 and the resuspended conidia were sprayed directly onto mosquitoes. The persistence of conidia impregnated on black cloths using three different carriers was evaluated in test rooms. Fifty mosquitoes were released into each room and after a 5 day period, the surviving insects were captured. Another 50 insects were then released into each room. The capacity of the fungus at reducing mosquito survival was evaluated over a total of 35 days. Results Conidia extracted from cloths maintained on the veranda for 2 to 18 days remained virulent, with 28 to 60% mosquito survival observed. Mosquito survival following exposure to fungus impregnated cloths showed that fungus + Tween caused similar reductions to that of fungus + vegetable oil. Mosquitoes exposed to the formulation fungus + vegetable oil had survival rates of 36% over the first 5 days of the experiment. Following the release of the second cohort of mosquitoes (6-11days), survival increased to 50%. The survival of the 12–17 day cohort (78%) was statistically equal to that of the controls (84%). Formulation of the fungus in vegetable oil + isoparaffin increased the persistence of the fungus, with the 18–23 day cohort (64% survival) still showing statistical differences to that of the controls (87% survival). Conclusions The potential of entomopathogenic fungi for the control of adult A. aegypti was confirmed under field conditions. Vegetable oil + isoparaffin formulations of M. anisopliae significantly increased the effectiveness of the fungus, thus reducing the need for frequent changes of black cloths in residences. Our future aim is to obtain effective control of mosquito populations, with cloths only needing to being replaced once a month. PMID:24766705

Top