DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya; Joe, Jeffrey; Rice, Brandon
Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.« less
A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya; Boring, Ronald; Joe, Jeffrey
Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BLanc, Katya Le; Powers, David; Joe, Jeffrey
2015-08-01
Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologiesmore » that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.« less
Human Factors Principles in Information Dashboard Design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hugo, Jacques V.; St. Germain, Shawn
When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state conceptsmore » for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.« less
Human Factors Engineering Aspects of Modifications in Control Room Modernization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hugo, Jacques; Clefton, Gordon; Joe, Jeffrey
This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by variousmore » resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacques Hugo; Ronald Boring; Lew Hanes
2013-09-01
The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann
In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator
10. Interior view of control room in Components Test Laboratory ...
10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
21. Interior view of citric acid air pollution control room ...
21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
11. Interior view of control room in Components Test Laboratory ...
11. Interior view of control room in Components Test Laboratory (T-27), looking north. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Low Level RF Control for the PIP-II Accelerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edelen, J. P.; Chase, B. E.; Cullerton, E.
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.
2017-02-12
Since the days of Gemini all of America’s human spaceflight programs have been controlled by men and women stationed in one of several flight control rooms at NASA’s Johnson Space Center in Houston: the International Space Station flight controllers recently moved into an upgraded facility in the room that hosted the teams during the first manned flights of Apollo and the space shuttle. Here’s a tour of “Mission Control Houston” through the years, from its first generation through the facility ready for the flights of Orion, the spacecraft that will take humans farther into space than they’ve ever gone before.
2011-02-01
Heating, Ventilation, Air Conditioning (HVAC) system to environmentally control the HPA Room as well as a Mechanical Room to house the new diesel ...Rickie D. Moon, Senior Systems Engineer MS, Environmental Management, Samford University BS, Chemistry and Mathematics, Samford University 28...Huntsville 16 LPES, Inc. Timothy Lavallee, PE, Principal/Senior Engineer BS, Mechanical Engineering , Northeastern University MS, Civil and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald Boring; Roger Lew; Thomas Ulrich
2014-03-01
As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how themore » process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.« less
NASA Technical Reports Server (NTRS)
Dudley, Stephanie R. B.; Marsh, Angela L.
2014-01-01
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
Software Support during a Control Room Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michele Joyce; Michael Spata; Thomas Oren
2005-09-21
In 2004, after 14 years of accelerator operations and commissioning, Jefferson Lab renovated its main control room. Changes in technology and lessons learned during those 14 years drove the control room redesign in a new direction, one that optimizes workflow and makes critical information and controls available to everyone in the control room. Fundamental changes in a variety of software applications were required to facilitate the new operating paradigm. A critical component of the new control room design is a large-format video wall that is used to make a variety of operating information available to everyone in the room. Analogmore » devices such as oscilloscopes and function generators are now displayed on the video wall through two crosspoint switchers: one for analog signals and another for video signals. A new software GUI replaces manual configuration of the oscilloscopes and function generators and helps automate setup. Monitoring screens, customized for the video wall, now make important operating information visible to everyone, not just a single operator. New alarm handler software gives any operator, on any workstation, access to all alarm handler functionality, and multiple users can now contribute to a single electronic logbook entry. To further support the shift to distributed access and control, many applications have been redesigned to run on servers instead of on individual workstations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald
2013-03-01
The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator ismore » also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.« less
Engine Research Building’s Central Control Room
1948-07-21
Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.
Report for Task 8.4: Development of Control Room Layout Recommendations
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, Robert
Idaho National Laboratory (INL) has contracted Institutt for Energiteknikk (IFE) to support in the development of an end state vision for the US Nuclear industry and in particular for a utility that is currently moving forward with a control room modernization project. This support includes the development of an Overview display and technical support in conducting an operational study. Development of operational scenarios to be conducted using a full scope simulator at the INL HSSL. Additionally IFE will use the CREATE modelling tool to provide 3-D views of the potential and possible end state view after the completion of digitalmore » upgrade project.« less
A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joe, Jeffrey C.
Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model formore » U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.« less
Incident Involving 30-Ah Li-ion Cell at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Bennett, William
2006-01-01
The key lesson learned from the February 17, 2006 cell explosion incident is that PC-based test-systems, even those having built-in watchdog monitors, can lose control and malfunction. In the case of lithiumion cell/battery testing, the stored energy can be released explosively causing considerable injury and damage to facilities. The investigation showed that although the Arbin system has a built-in watchdog monitor, the circumstances of the incident defeated the action of the watchdog and allowed the cycler to continue operation without control. An upgrade to the most recent version of Arbin software (version 4) was provided as a fix to the presumed control problem. This upgrade included newer EPROM s for the cycler microprocessor. Investigation revealed that similar incidents have occurred at other NASA centers with a variety of PC-based test instruments. JPL suffered an incident with Maccor testers and the GRC fuel cell group observed similar problems with LabView software. This is not exclusively an Arbin problem, but an issue with all PC-based systems. In this incident, it was fortunate that the event occurred after-hours with no-one in the room. The facility arrangement placed control consoles adjacent to the test chamber doors. Had someone been in the room during the event, they would have been exposed to hot debris and toxic combustion products. It was also fortunate that the exploded cell stayed inside the chamber after the door was forced open. If the cell had been ejected into the room it could have caused serious facility damage by impact and possibly caused a fire in the facility.
Upgrade of the ATLAS Tile Calorimeter Electronics
NASA Astrophysics Data System (ADS)
Moreno, Pablo; ATLAS Tile Calorimeter System
2016-04-01
The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of 9852 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase II) where the peak luminosity will increase 5× compared to the design luminosity (1034 cm-2s-1) at center of mass energy of 14 TeV. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10.24 Gbps optical links are used to read out all digitized data to the counting room while 4.8 Gbps down-links are used for synchronization, configuration and detector control. For the off-detector electronics a pre-processor (sROD) is being developed, which takes care of the initial trigger processing while temporarily storing the main data flow in pipeline and de-randomizer memories. Field Programmable Gate Arrays are extensively used for the logic functions off- and on-detector. One demonstrator prototype module with the new calorimeter module electronics, but still compatible with the present system, is planned to be inserted in ATLAS at the end of 2015.
NASA Technical Reports Server (NTRS)
Marsh, Angela L.; Dudley, Stephanie R. B.
2014-01-01
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
Control Room at the NACA’s Rocket Engine Test Facility
1957-05-21
Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.
CuOF: an electrical to optical interface for the upgrade of the CMS muon Drift Tubes system
NASA Astrophysics Data System (ADS)
Dattola, D.; De Remigis, P.; Maselli, S.; Mazza, G.; Rotondo, F.; Wheadon, R.
2013-02-01
The upgrade of the Drift Tube system of the CMS experiment foresee the relocation of the electronics actually sitting on the racks beside the magnet from the cavern to the counting room. It is thus required to convert the signals from electrical to optical, for a total number of 3500 channels that run at up to 480 Mb/s. A Copper to Optical Fiber board is currently under design. The board is divided into a mother board, which hosts the slow control system based on Field Programmable Gate Array, and four mezzanine cards, each with 8 conversion channels. A prototype of the mezzanine board has been designed and tested under irradiation.
ATLAS trigger operations: Upgrades to ``Xmon'' rate prediction system
NASA Astrophysics Data System (ADS)
Myers, Ava; Aukerman, Andrew; Hong, Tae Min; Atlas Collaboration
2017-01-01
We present ``Xmon,'' a tool to monitor trigger rates in the Control Room of the ATLAS Experiment. We discuss Xmon's recent (1) updates, (2) upgrades, and (3) operations. (1) Xmon was updated to modify the tool written for the three-level trigger architecture in Run-1 (2009-2012) to adapt to the new two-level system for Run-2 (2015-current). The tool takes as input the beam luminosity to make a rate prediction, which is compared with incoming rates to detect anomalies that occur both globally throughout a run and locally within a run. Global offsets are more commonly caught by the predictions based upon past runs, where offline processing allows for function adjustments and fit quality through outlier rejection. (2) Xmon was upgraded to detect local offsets using on-the-fly predictions, which uses a sliding window of in-run rates to make predictions. (3) Xmon operations examples are given. Future work involves further automation of the steps to provide the predictive functions and for alerting shifters.
The Teacher, Standardized Testing, and Prospects of Revolution.
ERIC Educational Resources Information Center
Stake, Robert E.
1991-01-01
Counterbalancing the simplification of education caused by testing means relying on classroom teachers' conceptual powers. Classroom teaching is labor intensive and varies from room to room because diversity is the norm. Specifying standard academic skills and curriculum has not upgraded education. Children need opportunities to confront…
16. Interior view of Test Cell 8 (oxidizer) in Components ...
16. Interior view of Test Cell 8 (oxidizer) in Components Test Laboratory (T-27), showing east wall. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. The windows in the wall enable personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
13. Interior view of Test Cell 9 (fuel) in Components ...
13. Interior view of Test Cell 9 (fuel) in Components Test Laboratory (T-27), showing west and north walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. Two windows in the wall to the left enable personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
15. Interior view of Test Cell 10 (environmental) in Components ...
15. Interior view of Test Cell 10 (environmental) in Components Test Laboratory (T-27), showing north and east walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. The window in the wall to the left enables personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Verification and Validation of Digitally Upgraded Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boring, Ronald; Lau, Nathan
2015-09-01
As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cyclesmore » of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice—the propensity for late-stage V&V and the use of increasingly complex psychological assessment measures for V&V.« less
Adding Interferometer Restoration and Upgrade: Learning by Doing with the NINE Program
NASA Astrophysics Data System (ADS)
Saby, Linnea
2017-01-01
During the summer of 2016, participants in the National and International Non-Traditional Exchange (NINE) Program were responsible for the restoration and upgrade of N2I2, an instructional interferometer located on New Mexico Tech's Socorro campus. The NINE program is a National Radio Astronomy Observatory (NRAO) initiative geared towards providing training in project management and other STEM functional areas to underrepresented groups around the world. A description of this restoration project illustrates both the experience of a NINE program participant and, more specifically, how principles of engineering and project management were applied to achieve project objectives.N2I2 was created by a joint NRAO-New Mexico Tech (NMT) team and became operational in 2004. The original instrument comprised two ten-foot dishes which recieved signals that were added using a simple power combiner, and data was interpreted using software on computers located in a nearby control room. The theory of adding interferometry was re-discovered for the design of this unique telescope. N2I2 was built using simple hardware with the intention of allowing interested community members and students from middle school to graduate school to learn about the principles of radio astronomy.Unfortunately, between 2008 and 2016 N2I2 was not used on a regular basis and fell into disrepair. NINE program director Lory Wingate accepted the responsibility of restoring the instrument as an experiential learning opportunity for the Socorro, New Mexico NINE team.During their 9 week assignment, the NINE team created a project plan, replaced and upgraded antenna hardware, developed operation and maintenance manuals, and refurbished the control room. A project plan was created for the addition of a third antenna and that plan was successfully carried out during August and September of 2016.Ultimately, functionality was successfully restored and improved, a maintenance plan was put into place, and community interest in the instrument was reignited.
Upgrading the ATLAS Tile Calorimeter Electronics
NASA Astrophysics Data System (ADS)
Carrió, Fernando
2013-11-01
This work summarizes the status of the on-detector and off-detector electronics developments for the Phase 2 Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in the middle of 2014 during the first Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The Main Board will provide communication and control to the FEBs and the Daughter Board will transmit the digitized data to the off-detector electronics in the counting room, where the super Read-Out Driver (sROD) will perform processing tasks on them and will be the interface to the trigger levels 0, 1 and 2.
18. Interior view of HVAC room in Components Test Laboratory ...
18. Interior view of HVAC room in Components Test Laboratory (T-27), showing northwest corner. Photograph shows upgraded instrumentation, piping, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
19. Interior view of HVAC room in Components Test Laboratory ...
19. Interior view of HVAC room in Components Test Laboratory (T-27), looking toward east wall. Photograph shows upgraded instrumentation, machinery, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Help | About | Privacy | Media Room | Feedback Start Describe Compare Upgrade Learn Error: Your Session Timed Out, Please click the start button to restart. Write down your session id. Environmental
Acoustic Calibration of the Exterior Effects Room at the NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Faller, Kenneth J., II; Rizzi, Stephen A.; Klos, Jacob; Chapin, William L.; Surucu, Fahri; Aumann, Aric R.
2010-01-01
The Exterior Effects Room (EER) at the NASA Langley Research Center is a 39-seat auditorium built for psychoacoustic studies of aircraft community noise. The original reproduction system employed monaural playback and hence lacked sound localization capability. In an effort to more closely recreate field test conditions, a significant upgrade was undertaken to allow simulation of a three-dimensional audio and visual environment. The 3D audio system consists of 27 mid and high frequency satellite speakers and 4 subwoofers, driven by a real-time audio server running an implementation of Vector Base Amplitude Panning. The audio server is part of a larger simulation system, which controls the audio and visual presentation of recorded and synthesized aircraft flyovers. The focus of this work is on the calibration of the 3D audio system, including gains used in the amplitude panning algorithm, speaker equalization, and absolute gain control. Because the speakers are installed in an irregularly shaped room, the speaker equalization includes time delay and gain compensation due to different mounting distances from the focal point, filtering for color compensation due to different installations (half space, corner, baffled/unbaffled), and cross-over filtering.
Pico-Kelvin thermometry and temperature stabilization using a resonant optical cavity.
Tan, Si; Wang, Suwen; Saraf, Shailendhar; Lipa, John A
2017-02-20
Ultra-high sensitivity temperature sensing and stable thermal control are crucial for many science experiments testing fundamental theories to high precision. Here we report the first pico-kevin scale thermometer operating at room temperature with an exceptionally low theoretical noise figure of ~70pK/Hz at 1 Hz and a high dynamic range of ~500 K. We have experimentally demonstrated a temperature sensitivity of <3.8nK/Hz at 1 Hz near room temperature, which is an order of magnitude improvement over the state of the art. We have also demonstrated an ultra-high stability thermal control system using this thermometer, achieving 3.7 nK stability at 1 s and ∼ 120 pK at 104 s, which is 10-100 times more stable than the state of the art. With some upgrades to this proof-of-principle device, we can expect it to be used for very high resolution tests of special relativity and in critical point phenomena.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sannibale, F.; Filippetto, D.; Johnson, M.
The past decade was characterized by an increasing scientific demand for extending towards higher repetition rates (MHz class and beyond) the performance of already operating lower repetition rate accelerator-based instruments such as x-ray free electron lasers (FELs) and ultrafast electron diffraction (UED) and microscopy (UEM) instruments. Such a need stimulated a worldwide spread of a vibrant R & D activity targeting the development of high-brightness electron sources capable of operating at these challenging rates. Among the different technologies pursued, rf guns based on room-temperature structures resonating in the very high frequency (VHF) range (30-300 MHz) and operating in continuous wavemore » successfully demonstrated in the past few years the targeted brightness and reliability. Nonetheless, recently proposed upgrades for x-ray FELs and the always brightness-frontier applications such as UED and UEM are now requiring a further step forward in terms of beam brightness in electron sources. Here, we present a few possible upgrade paths that would allow one to extend, in a relatively simple and cost-effective way, the performance of the present VHF technology to the required new goals.« less
Sannibale, F.; Filippetto, D.; Johnson, M.; ...
2017-11-27
The past decade was characterized by an increasing scientific demand for extending towards higher repetition rates (MHz class and beyond) the performance of already operating lower repetition rate accelerator-based instruments such as x-ray free electron lasers (FELs) and ultrafast electron diffraction (UED) and microscopy (UEM) instruments. Such a need stimulated a worldwide spread of a vibrant R & D activity targeting the development of high-brightness electron sources capable of operating at these challenging rates. Among the different technologies pursued, rf guns based on room-temperature structures resonating in the very high frequency (VHF) range (30-300 MHz) and operating in continuous wavemore » successfully demonstrated in the past few years the targeted brightness and reliability. Nonetheless, recently proposed upgrades for x-ray FELs and the always brightness-frontier applications such as UED and UEM are now requiring a further step forward in terms of beam brightness in electron sources. Here, we present a few possible upgrade paths that would allow one to extend, in a relatively simple and cost-effective way, the performance of the present VHF technology to the required new goals.« less
Distribution and Room Air Mixing Risks to Retrofitted Homes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, A.
2014-12-01
An energy efficiency upgrade reduces a home’s heating and cooling load. If the load reduction is great enough and the heating, ventilation, and air conditioning system warrants replacement, that system is often upgraded with a more efficient, lower capacity system that meets the load of the upgraded house. For a single-story house with floor supply air diffusers, the ducts often are removed and upgraded. For houses with ducts that are embedded in walls, the cost of demolition precludes the replacement of ducts. The challenge with the use of existing ducts is that the reduced airflow creates a decreased throw atmore » the supply registers, and the supply air and room air do not mix well, leading to potential thermal comfort complaints. This project investigates this retrofit scenario. The issues and solutions discussed here are relevant to all climate zones, with emphasis on climates that require cooling. In this project, IBACOS performed load calculations for a two-story 1960s house and characterized duct sizes and layouts based on industry “rules of thumb” (Herk et al. 2014). The team performed duct-sizing calculations for unaltered ducts and post-retrofit airflows and examined airflow velocities and pressure changes with respect to various factors. The team then used a mocked-up duct and register setup to measure the characteristics of isothermal air—to reduce the effects of buoyancy from the observations—passing through the duct and leaving the register.« less
2007-07-08
KENNEDY SPACE CENTER, FLA. -- The payload canister is lifted off its transporter up to the payload changeout room. Inside the canister are the S5 truss, SPACEHAB module and external stowage platform 3, the payload for mission STS-118. The red umbilical lines are still attached. The payloads will be transferred inside the changeout room to wait for Space Shuttle Endeavour to arrive at the pad. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the orbiter payload bay. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Space Shuttle Endeavour is targeted for launch on Aug. 7 from Launch Pad 39A. Photo credit: NASA/Kim Shiflett
2007-07-08
KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, the payload canister is lifted up to the payload changeout room. Inside the canister are the S5 truss, SPACEHAB module and external stowage platform 3, the payload for mission STS-118. The red umbilical lines are still attached. The payloads will be transferred inside the changeout room to wait for Space Shuttle Endeavour to arrive at the pad. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the orbiter payload bay. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Space Shuttle Endeavour is targeted for launch on Aug. 7 from Launch Pad 39A. Photo credit: NASA/Kim Shiflett
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joe, Jeffrey .C; Boring, Ronald L.
Under the United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program, researchers at Idaho National Laboratory (INL) have been using the Human Systems Simulation Laboratory (HSSL) to conduct critical safety focused Human Factors research and development (R&D) for the nuclear industry. The LWRS program has the overall objective to develop the scientific basis to extend existing nuclear power plant (NPP) operating life beyond the current 60-year licensing period and to ensure their long-term reliability, productivity, safety, and security. One focus area for LWRS is the NPP main control room (MCR), because many of the instrumentation andmore » control (I&C) system technologies installed in the MCR, while highly reliable and safe, are now difficult to replace and are therefore limiting the operating life of the NPP. This paper describes how INL researchers use the HSSL to conduct Human Factors R&D on modernizing or upgrading these I&C systems in a step-wise manner, and how the HSSL has addressed a significant gap in how to upgrade systems and technologies that are built to last, and therefore require careful integration of analog and new advanced digital technologies.« less
D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rucinski, Russ; /Fermilab
1995-11-17
This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above personal judgement are required for the installation work.
A Business Case for Nuclear Plant Control Room Modernization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, Ken; Lawrie, Sean; Niedermuller, Josef M.
This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority ofmore » savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization« less
NASA Astrophysics Data System (ADS)
Nellist, C.; Dinu, N.; Gkougkousis, E.; Lounis, A.
2015-06-01
The LHC accelerator complex will be upgraded between 2020-2022, to the High-Luminosity-LHC, to considerably increase statistics for the various physics analyses. To operate under these challenging new conditions, and maintain excellent performance in track reconstruction and vertex location, the ATLAS pixel detector must be substantially upgraded and a full replacement is expected. Processing techniques for novel pixel designs are optimised through characterisation of test structures in a clean room and also through simulations with Technology Computer Aided Design (TCAD). A method to study non-perpendicular tracks through a pixel device is discussed. Comparison of TCAD simulations with Secondary Ion Mass Spectrometry (SIMS) measurements to investigate the doping profile of structures and validate the simulation process is also presented.
Shuttle optical environment; Proceedings of the Meeting, Washington, DC, April 23, 24, 1981
NASA Technical Reports Server (NTRS)
Miller, E. R. (Editor); Fazio, G. G.
1982-01-01
The numerical modeling, instrumentation, identification, and procedures to characterize and/or control contamination hazards to equipment used on the Shuttle are discussed. On-orbit pollutants include molecular offgassing and outgassing, particulate material, and substances from thrusters, vents, and leaks. Clean-rooms are being implemented in ground assembly and integration facilities. Attention is given to an upgraded SPACE program for numerically modeling contamination pathways and appropriate procedures to protect instrumentation from film and particulate deposition. Finally, attention is given to military cryogenic IR detectors being employed to quantify the Shuttle thermal and solid pollutant environment on-orbit as a prelude to future operational IR sensors.
Testing of the new tuner design for the CEBAF 12 GeV upgrade SRF cavities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edward Daly; G. Davis; William Hicks
2005-05-01
The new tuner design for the 12 GeV Upgrade SRF cavities consists of a coarse mechanical tuner and a fine piezoelectric tuner. The mechanism provides a 30:1 mechanical advantage, is pre-loaded at room temperature and tunes the cavities in tension only. All of the components are located in the insulating vacuum space and attached to the helium vessel, including the motor, harmonic drive and piezoelectric actuators. The requirements and detailed design are presented. Measurements of range and resolution of the coarse tuner are presented and discussed.
Help | About | Privacy | Media Room | Feedback Start Describe Compare Upgrade Community Press For members of the media, we've gathered some press materials issued by Berkeley Lab, including the press Energy Management Software Home Energy Saver Website Computes Possible Savings for Homeowners Media
Design and upgrades for the Sloan Digital Sky Survey telescope's roll-off enclosure
NASA Astrophysics Data System (ADS)
Leger, R. French; Long, Dan; Klaene, Mark A.
2003-02-01
The SDSS telescope is housed, when not in use, in a roll-off enclosure. This enclosure rolls away from the telescope a distance of 60 feet, leaving the telescope fully exposed for operations. Design considerations for wind and solar loading, thermal venting, conditioning and stability are reviewed. Originally, the enclosure had been constructed to minimize its surface area obstruction to the telescopes field of view. This design feature, however, offered little room to perform engineering tasks during non-operational time. An upgrade to the structure, in the form of raising the roof, was instituted. This improvement greatly enhanced the engineering and testing functions performed on the telescope, thereby increasing operational efficiency and the time allotted to engineering tasks. Problems maintaining and associated with weather sealing, lightning protection, truck wheel alignment, altitude effects on truck controllers and thermal conditioning are examined. Communication and electrical connections between stationary and moving elements of the enclosure are described. Two types of systems, to date, have been used one a reel and the other a slider system. Advantages and disadvantages of both are examined from the perspective of four years experience.
Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade)
2015-12-01
Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-277 Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade) As of...Upgrade December 2015 SAR March 23, 2016 16:04:37 UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MDAP Programs 3 Program...Acquisition Unit Cost AWACS Blk 40/45 Upgrade December 2015 SAR March 23, 2016 16:04:37 UNCLASSIFIED 3 PB - President’s Budget PE - Program Element
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas Ulrich; Ronald Boring; William Phoenix
2012-08-01
The United States (U.S.) nuclear industry, like similar process control industries, has moved toward upgrading its control rooms. The upgraded control rooms typically feature digital control system (DCS) displays embedded in the panels. These displays gather information from the system and represent that information on a single display surface. In this manner, the DCS combines many previously separate analog indicators and controls into a single digital display, whereby the operators can toggle between multiple windows to monitor and control different aspects of the plant. The design of the DCS depends on the function of the system it monitors, but revolvesmore » around presenting the information most germane to an operator at any point in time. DCSs require a carefully designed human system interface. This report centers on redesigning existing DCS displays for an example chemical volume control system (CVCS) at a U.S. nuclear power plant. The crucial nature of the CVCS, which controls coolant levels and boration in the primary system, requires a thorough human factors evaluation of its supporting DCS. The initial digital controls being developed for the DCSs tend to directly mimic the former analog controls. There are, however, unique operator interactions with a digital vs. analog interface, and the differences have not always been carefully factored in the translation of an analog interface to a replacement DCS. To ensure safety, efficiency, and usability of the emerging DCSs, a human factors usability evaluation was conducted on a CVCS DCS currently being used and refined at an existing U.S. nuclear power plant. Subject matter experts from process control engineering, software development, and human factors evaluated the DCS displays to document potential usability issues and propose design recommendations. The evaluation yielded 167 potential usability issues with the DCS. These issues should not be considered operator performance problems but rather opportunities identified by experts to improve upon the design of the DCS. A set of nine design recommendations was developed to address these potential issues. The design principles addressed the following areas: (1) color, (2) pop-up window structure, (3) navigation, (4) alarms, (5) process control diagram, (6) gestalt grouping, (7) typography, (8) terminology, and (9) data entry. Visuals illustrating the improved DCS displays accompany the design recommendations. These nine design principles serve as the starting point to a planned general DCS style guide that can be used across the U.S. nuclear industry to aid in the future design of effective DCS interfaces.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cordaro, J.; Holland, M.; Reeves, G.
The Savannah River Site (SRS) has the analytical measurement capability to perform high-precision plutonium concentration measurements by controlled-potential coulometry. State-of-the-art controlled-potential coulometers were designed and fabricated by the Savannah River National Laboratory and installed in the Analytical Laboratories process control laboratory. The Analytical Laboratories uses coulometry for routine accountability measurements of and for verification of standard preparations used to calibrate other plutonium measurement systems routinely applied to process control, nuclear safety, and other accountability applications. The SRNL Coulometer has a demonstrated measurement reliability of {approx}0.05% for 10 mg samples. The system has also been applied to the characterization of neptuniummore » standard solutions with a comparable reliability. The SRNL coulometer features: a patented current integration system; continuous electrical calibration versus Faraday's Constants and Ohm's Law; the control-potential adjustment technique for enhanced application of the Nernst Equation; a wide operating room temperature range; and a fully automated instrument control and data acquisition capability. Systems have been supplied to the International Atomic Energy Agency (IAEA), Russia, Japanese Atomic Energy Agency (JAEA) and the New Brunswick Laboratory (NBL). The most recent vintage of electronics was based on early 1990's integrated circuits. Many of the components are no longer available. At the request of the IAEA and the Department of State, SRNL has completed an electronics upgrade of their controlled-potential coulometer design. Three systems have built with the new design, one for the IAEA which was installed at SAL in May 2011, one system for Los Alamos National Laboratory, (LANL) and one for the SRS Analytical Laboratory. The LANL and SRS systems are undergoing startup testing with installation scheduled for this summer.« less
Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2002-01-01
This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.
Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata
NASA Astrophysics Data System (ADS)
Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava
2015-03-01
The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.
Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata.
Roy, Anindya; Bhole, R B; Nandy, Partha P; Yadav, R C; Pal, Sarbajit; Roy, Amitava
2015-03-01
The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.
NASA Glenn PSL-3 and 4 Control System Upgrade
NASA Technical Reports Server (NTRS)
Lizanich, Paul J.
2010-01-01
An overview of the PSL-3&4 Jet Engine Test Facility control system; including its history, a description of the present effort to upgrade from Emerson Ovation v2.2 to V3.3.1, and future upgrade plans is shown.
Upgrade of a GEP50 robot control system
NASA Astrophysics Data System (ADS)
Alounai, Ali T.; Gharsalli, Imed
2000-03-01
Recently the ASL at Tennessee Technological University was donated a GEP50 welder. The welding is done via off line point-to-point teaching. A state of the art robot was needed for research but because money was not available to purchase such an expensive item. It was therefore decided to upgrade the GEP50 control system to make the welder a multitasking robot. The robot has five degrees of freedom can be sufficient to pursue some research in robotics control. The problem was that the control system of the welder is limited to point-to-point control, using off-line teaching. To make the GEP50 a multitasking robot that can be controlled using different control strategies, the existing control system of the welder had to be replaced. The upgrade turned to be a low cost operation. This robot is currently in sue to test different advanced control strategies in the ASL. This work discusses all the steps and tasks undertaken during the upgrade operation. The hardware and software required or the upgrade are provided in this paper. The newly developed control system has been implemented and tested successfully.
Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less
Instrumentation and control upgrade plan for Browns Ferry nuclear plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Belew, M.R.; Langley, D.T.; Torok, R.C.
1992-01-01
A comprehensive upgrade of the instrumentation and control (I C) systems at a power plant represents a formidable project for any utility. For a nuclear plant, the extra safety and reliability requirements along with regulatory constraints add further complications and cost. The need for the upgrade must, therefore, be very compelling, and the process must be well planned from the start. This paper describes the steps taken to initiate the I C upgrade process for Tennessee Valley Authority's (TVA's) Browns Ferry 2 nuclear plant. It explains the impetus for the upgrade, the expected benefits, and the process by which systemmore » upgrades will be selected and implemented.« less
Upgrade of U.S. EPA's Experimental Stream Facility Supervisory Control and Data Acquisition System
The Supervisory control and data acquisition (SCADA) system for the U.S. EPA’s Experimental Stream Facility (ESF) was upgraded using Camile hardware and software in 2015. The upgrade added additional hardwired connections, new wireless capabilities, and included a complete rewrit...
Anatomy of an upgraded pulverized coal facility: Combustion modification through flue gas scrubbing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watts, J.U.; Savichky, W.J.; O`Dea, D.T.
1997-12-31
Regeneration is a biological term for formation or creating anew. In the case of Milliken station, a species of steam generation (Tangentus coali) regeneration refers to refitting critical systems with the latest technological advances to reduce emissions while maintaining or improving performance. The plant has undergone a series of operations which provided anatomical changes as well as a face lift. Each of the two units were place in suspended animation (outage) to allow these changes to be made. The paper describes the project which includes retrofitting combustion systems, pulverizers, boiler liners, scrubbers, and control room. This retrofit is meant tomore » increase thermal efficiency while reducing the formation of nitrogen oxides.« less
Software and Human-Machine Interface Development for Environmental Controls Subsystem Support
NASA Technical Reports Server (NTRS)
Dobson, Matthew
2018-01-01
The Space Launch System (SLS) is the next premier launch vehicle for NASA. It is the next stage of manned space exploration from American soil, and will be the platform in which we push further beyond Earth orbit. In preparation of the SLS maiden voyage on Exploration Mission 1 (EM-1), the existing ground support architecture at Kennedy Space Center required significant overhaul and updating. A comprehensive upgrade of controls systems was necessary, including programmable logic controller software, as well as Launch Control Center (LCC) firing room and local launch pad displays for technician use. Environmental control acts as an integral component in these systems, being the foremost system for conditioning the pad and extremely sensitive launch vehicle until T-0. The Environmental Controls Subsystem (ECS) required testing and modification to meet the requirements of the designed system, as well as the human factors requirements of NASA software for Validation and Verification (V&V). This term saw significant strides in the progress and functionality of the human-machine interfaces used at the launch pad, and improved integration with the controller code.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2002-01-01
This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.
Model for Evaluating the Cost Consequences of Deferring New System Acquisition Through Upgrades
1999-07-01
Analysis & Evaluation The Pentagon Washington, DC 20301 Attn: Mr. Eric Coulter, Director Projection Forces Division, Room 2E314 Lt Col Kathleen Conley...1034 Office of the Air National Guard ANG/AQM 5109 Leesburg Pike Skyline VI, Suite 302A Falls Church, VA 22041-3201 Attn: Col Brent Marler 1 Lt Col
Wang, Xiuqin; Congdon, Nathan; Ma, Yue; Hu, Min; Zhou, Yuan; Liao, Weiqi; Jin, Ling; Xiao, Baixiang; Wu, Xiaoyi; Ni, Ming; Yi, Hongmei; Huang, Yiwen; Varga, Beatrice; Zhang, Hong; Cun, Yongkang; Li, Xianshun; Yang, Luhua; Liang, Chaoguang; Huang, Wan; Rozelle, Scott; Ma, Xiaochen
2017-01-01
Offering free glasses can be important to increase children's wear. We sought to assess whether "Upgrade glasses" could avoid reduced glasses sales when offering free glasses to children in China. In this cluster-randomized, controlled trial, children with uncorrected visual acuity (VA)< = 6/12 in either eye correctable to >6/12 in both eyes at 138 randomly-selected primary schools in 9 counties in Guangdong and Yunnan provinces, China, were randomized by school to one of four groups: glasses prescription only (Control); Free Glasses; Free Glasses + offer of $15 Upgrade Glasses; Free Glasses + offer of $30 Upgrade Glasses. Spectacle purchase (main outcome) was assessed 6 months after randomization. Among 10,234 children screened, 882 (8.62%, mean age 10.6 years, 45.5% boys) were eligible and randomized: 257 (29.1%) at 37 schools to Control; 253 (28.7%) at 32 schools to Free Glasses; 187 (21.2%) at 31 schools to Free Glasses + $15 Upgrade; and 185 (21.0%) at 27 schools to Free Glasses +$30 Upgrade. Baseline ownership among these children needing glasses was 11.8% (104/882), and 867 (98.3%) children completed follow-up. Glasses purchase was significantly less likely when free glasses were given: Control: 59/250 = 23.6%; Free glasses: 32/252 = 12.7%, P = 0.010. Offering Upgrade Glasses eliminated this difference: Free + $15 Upgrade: 39/183 = 21.3%, multiple regression relative risk (RR) 0.90 (0.56-1.43), P = 0.65; Free + $30 Upgrade: 38/182 = 20.9%, RR 0.91 (0.59, 1.42), P = 0.69. Upgrade glasses can prevent reductions in glasses purchase when free spectacles are provided, providing important program income. ClinicalTrials.gov Identifier: NCT02231606. Registered on 31 August 2014.
Richardson, George; Barton, Andrew; Basham, Meryl; Foy, Chris; Eick, Susan Ann; Somerville, Margaret
2006-05-15
A three-year study (1999-2001) was initiated in the UK to assess the effect of improving housing conditions in 3-4 bedroom, single-family unit, social rented sector houses on the health of the occupants. The houses were randomised into two groups. Phase I houses received extensive upgrading including wet central heating, on demand ventilation, double-glazed doors, cavity wall and roof/loft insulation. An identical intervention for Phase II houses was delayed for one year. As part of this randomised waiting list study, discrete measurements were made of indoor environmental variables in each house, to assess the short-term effects of improving housing conditions on the indoor environment. Variables representative of indoor environmental conditions were measured in the living room, bedroom and outdoors in each of the three years of the study. In 2000, there was a significant difference between the changes from 1999 to 2000 between Phase I (upgraded) and II (not then upgraded) houses for bedroom temperatures (p=0.002). Changes in wall surface dampness and wall dampness in Phase I houses were also significantly different to the change in Phase II houses in 2000 (p=0.001), but by 2001 the Phase I houses had reverted to the same dampness levels they had before upgrading. The housing upgrades increased bedroom temperatures in all houses. Other indoor environmental variables were not affected.
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
2010-10-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller
Data Recording Room in the 10-by 10-Foot Supersonic Wind Tunnel
1973-04-21
The test data recording equipment located in the office building of the 10-by 10-Foot Supersonic Wind Tunnel at the NASA Lewis Research Center. The data system was the state of the art when the facility began operating in 1955 and was upgraded over time. NASA engineers used solenoid valves to measure pressures from different locations within the test section. Up 48 measurements could be fed into a single transducer. The 10-by 10 data recorders could handle up to 200 data channels at once. The Central Automatic Digital Data Encoder (CADDE) converted this direct current raw data from the test section into digital format on magnetic tape. The digital information was sent to the Lewis Central Computer Facility for additional processing. It could also be displayed in the control room via strip charts or oscillographs. The 16-by 56-foot long ERA 1103 UNIVAC mainframe computer processed most of the digital data. The paper tape with the raw data was fed into the ERA 1103 which performed the needed calculations. The information was then sent back to the control room. There was a lag of several minutes before the computed information was available, but it was exponentially faster than the hand calculations performed by the female computers. The 10- by 10-foot tunnel, which had its official opening in May 1956, was built under the Congressional Unitary Plan Act which coordinated wind tunnel construction at the NACA, Air Force, industry, and universities. The 10- by 10 was the largest of the three NACA tunnels built under the act.
The nuMOIRCS project: detector upgrade overview and early commissioning results
NASA Astrophysics Data System (ADS)
Walawender, Josh; Wung, Matthew; Fabricius, Maximilian; Tanaka, Ichi; Arimoto, Nobuo; Cook, David; Elms, Brian; Hashiba, Yasuhito; Hu, Yen-Sang; Iwata, Ikuru; Nishimura, Tetsuo; Omata, Koji; Takato, Naruhisa; Wang, Shiang-Yu; Weber, Mark
2016-08-01
In 2014 and 2015 the Multi-Object InfraRed Camera and Spectrograph (MOIRCS) instrument at the Subaru Telescope on Maunakea is underwent a significant modernization and upgrade project. We upgraded the two Hawaii2 detectors to Hawaii2-RG models, modernized the cryogenic temperature control system, and rewrote much of the instrument control software. The detector upgrade replaced the Hawaii2 detectors which use the Tohoku University Focal Plane Array Controller (TUFPAC) electronics with Hawaii2-RG detectors using SIDECAR ASIC (a fully integrated FPA controller system-on-a-chip) and a SAM interface card. We achieved an improvement in read noise by a factor of about 2 with this detector and electronics upgrade. The cryogenic temperature control upgrade focused on modernizing the components and making the procedures for warm up and cool down of the instrument safer. We have moved PID control loops out of the instrument control software and into Lakeshore model 336 cryogenic temperature controllers and have added interlocks on the warming systems to prevent overheating of the instrument. Much of the instrument control software has also been re-written. This was necessitated by the different interface to the detector electronics (ASIC and SAM vs. TUFPAC) and by the desire to modernize the interface to the telescope control software which has been updated to Subaru's "Gen2" system since the time of MOIRCS construction and first light. The new software is also designed to increase reliability of operation of the instrument, decrease overheads, and be easier for night time operators and support astronomers to use.
Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roy, Anindya, E-mail: r-ani@vecc.gov.in; Bhole, R. B.; Nandy, Partha P.
2015-03-15
The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A setmore » of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.« less
Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meador, Richard J.; Hatley, Darrel D.
2004-03-18
Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less
Wang, Xiuqin; Ma, Yue; Hu, Min; Zhou, Yuan; Liao, Weiqi; Jin, Ling; Xiao, Baixiang; Wu, Xiaoyi; Ni, Ming; Yi, Hongmei; Huang, Yiwen; Varga, Beatrice; Zhang, Hong; Cun, Yongkang; Li, Xianshun; Yang, Luhua; Liang, Chaoguang; Huang, Wan; Rozelle, Scott; Ma, Xiaochen
2017-01-01
Background Offering free glasses can be important to increase children’s wear. We sought to assess whether “Upgrade glasses” could avoid reduced glasses sales when offering free glasses to children in China. Methods In this cluster-randomized, controlled trial, children with uncorrected visual acuity (VA)< = 6/12 in either eye correctable to >6/12 in both eyes at 138 randomly-selected primary schools in 9 counties in Guangdong and Yunnan provinces, China, were randomized by school to one of four groups: glasses prescription only (Control); Free Glasses; Free Glasses + offer of $15 Upgrade Glasses; Free Glasses + offer of $30 Upgrade Glasses. Spectacle purchase (main outcome) was assessed 6 months after randomization. Results Among 10,234 children screened, 882 (8.62%, mean age 10.6 years, 45.5% boys) were eligible and randomized: 257 (29.1%) at 37 schools to Control; 253 (28.7%) at 32 schools to Free Glasses; 187 (21.2%) at 31 schools to Free Glasses + $15 Upgrade; and 185 (21.0%) at 27 schools to Free Glasses +$30 Upgrade. Baseline ownership among these children needing glasses was 11.8% (104/882), and 867 (98.3%) children completed follow-up. Glasses purchase was significantly less likely when free glasses were given: Control: 59/250 = 23.6%; Free glasses: 32/252 = 12.7%, P = 0.010. Offering Upgrade Glasses eliminated this difference: Free + $15 Upgrade: 39/183 = 21.3%, multiple regression relative risk (RR) 0.90 (0.56–1.43), P = 0.65; Free + $30 Upgrade: 38/182 = 20.9%, RR 0.91 (0.59, 1.42), P = 0.69. Conclusions Upgrade glasses can prevent reductions in glasses purchase when free spectacles are provided, providing important program income. Trial registration ClinicalTrials.gov Identifier: NCT02231606. Registered on 31 August 2014. PMID:29161286
Dormitory renovation project reduces energy use by 69%
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kokayko, M.J.
1997-06-01
Baldwin Hall is a three-story, 46,000 ft{sup 2} (4,273 m{sup 1}) dormitory on the campus of Allegheny College in Meadville, Pa. The building was originally built in the 1950s; an additional wing was added in the 1970s so that it has about 37,000 ft{sup 2} (3,437 m{sup 2}). The building contains approximately 100 double-occupancy student rooms; three common bathroom groups per floor; central study, lounge, and computer areas; and a laundry. Design for the renovation started in the winter of 1993; construction took place in the summer of 1994. The major goals of the renovation were: (1) to replace themore » entire building heating system (central boiler plant, distribution piping, and room heating terminals); (2) add a ventilation system within the building; (3) upgrade the building electrical system; (4) provide computer data cabling and cable TV wiring to each room; and, (5) improve room and hallway lighting and finishes.« less
Upgrades at the NASA Langley Research Center National Transonic Facility
NASA Technical Reports Server (NTRS)
Paryz, Roman W.
2012-01-01
Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.
NASA Astrophysics Data System (ADS)
Neidhardt, Alexander; Schönberger, Matthias; Plötz, Christian; Kronschnabl, Gerhard
2014-12-01
VGOS is a challenge for all fields of a new radio telescope. For the future software and hardware control mechanisms, it also requires new developments and solutions. More experiments, more data, high-speed data transfers through the Internet, and a real-time monitoring of current system status information must be handled. Additionally, an optimization of the observation shifts is required to reduce work load and costs. Within the framework of the development of the new 13.2-m Twin radio Telescopes Wettzell (TTW) and in combination with upgrades of the 20-m Radio Telescope Wettzell (RTW), some new technical realizations are under development and testing. Besides the activities for the realization of remote control, mainly supported during the project ``Novel EXploration Pushing Robust e-VLBI Services (NEXPReS)'' of the European VLBI Network (EVN), autonomous, automated, and unattended observations are also planned. A basic infrastructure should enable these, e.g., independent monitoring and security systems or additional, local high-speed transfer networks to ship data directly from a telescope to the main control room.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-12
... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory... (NRC or the Commission) is requesting public comment on Chapter 7, Section 7.3, Reactor Control System...-Power Reactors: Format and Content,'' for instrumentation and control (I&C) upgrades and NUREG-1537...
Mass Storage System Upgrades at the NASA Center for Computational Sciences
NASA Technical Reports Server (NTRS)
Tarshish, Adina; Salmon, Ellen; Macie, Medora; Saletta, Marty
2000-01-01
The NASA Center for Computational Sciences (NCCS) provides supercomputing and mass storage services to over 1200 Earth and space scientists. During the past two years, the mass storage system at the NCCS went through a great deal of changes both major and minor. Tape drives, silo control software, and the mass storage software itself were upgraded, and the mass storage platform was upgraded twice. Some of these upgrades were aimed at achieving year-2000 compliance, while others were simply upgrades to newer and better technologies. In this paper we will describe these upgrades.
Progress and plan of KSTAR plasma control system upgrade
Hahn, Sang-hee; Kim, Y. J.; Penaflor, B. G.; ...
2016-06-01
The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable duringmore » the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.« less
Positive train control test bed interoperability upgrades.
DOT National Transportation Integrated Search
2013-02-01
Transportation Technology Center, Inc. (TTCI) upgraded the Positive Train Control (PTC) Test Bed to support additional PTC testing configurations under Federal Railroad Administration (FRA) Task Order 270. The scope of work provided additional PTC Co...
SBIR Phase II Final Report - Multi-Protocol Energy Management Gateway for Home-Area Networks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanna, Jason
Significant amounts of electricity, natural gas, and heating oil are wasted by homeowners due to inefficient operation and inadequate maintenance of heating, ventilation, and air conditioning (HVAC) equipment. Coincident’s work under this award reduces energy waste, saves consumers money, and reduces carbon emissions. It does so in three ways: First, Coincident’s approach replaces the traditional thermostat with a wireless network of sensors and controllers that measure temperature, humidity and occupancy in multiple rooms in the house. The “Internet of Things” is a technology trend holding the promise of ubiquitous inexpensive sensors. The reality, however, is that energy and HVAC monitoringmore » and management is a patchwork of incompatible protocols and expensive proprietary technologies. Coincident’s multi-protocol architecture, developed in part under this award tackles this problem and brings low cost interoperable sensor and control devices to market. Second, the Coincident system eliminates hard-to-program and rigid thermostat schedules and instead provides automatic operation of heating and cooling by combining individual temperature and comfort preferences with energy-saving targets, real-time utility use information, weather data, and room utilization patterns. Energy efficiency technology must be appealing to consumers otherwise it will not be used. The Coincident user interface has engaging features such as remote control from any smart phone or web browser and per-room performance breakdowns. Expected energy savings resulting from more efficient operation of heating and air conditioning equipment are in the range of 10-20%. Third, the Coincident system provides heating and air-conditioning contractors with fine-grained performance data for every residence they support (subject to customer privacy controls). This data is integrated from diverse networks within the residence and includes HVAC performance and fuel use data. This information allows the partner to validate energy savings and identify potential system faults (whether from installation problems or maintenance issues). When combined with professional installation as part of high-efficiency HVAC upgrade, energy savings levels of 20-30% can be achieved. Economic feasibility of energy efficiency technology is one of the key challenges addressed in this award. The Coincident system is engineered to be delivered at a disruptive price point, making the system financially feasible for new and retrofit homes of all types and sizes. The Coincident system is intended to be sold through the HVAC professional—the industry most capable of improving HVAC efficiency. Providing HVAC contractors with detailed home performance data motivates them to sell the product, provides them with maintenance and upgrade revenue opportunities, and therefore delivers customer savings and environmental benefits. Having demonstrated technical and financial feasibility, Coincident has won additional grants and awards, participated in pilot projects, started partnership discussions with several HVAC equipment vendors, and has lined up several large channel partners ready to participate in large pilot rollouts.« less
[Minimally invasive surgery and robotic surgery: surgery 4.0?].
Feußner, H; Wilhelm, D
2016-03-01
Surgery can only maintain its role in a highly competitive environment if results are continuously improved, accompanied by further reduction of the interventional trauma for patients and with justifiable costs. Significant impulse to achieve this goal was expected from minimally invasive surgery and, in particular, robotic surgery; however, a real breakthrough has not yet been achieved. Accordingly, the new strategic approach of cognitive surgery is required to optimize the provision of surgical treatment. A full scale integration of all modules utilized in the operating room (OR) into a comprehensive network and the development of systems with technical cognition are needed to upgrade the current technical environment passively controlled by the surgeon into an active collaborative support system (surgery 4.0). Only then can the true potential of minimally invasive surgery and robotic surgery be exploited.
Addressing the human factors issues associated with control room modifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
O`Hara, J.; Stubler, W.; Kramer, J.
1998-03-01
Advanced human-system interface (HSI) technology is being integrated into existing nuclear plants as part of plant modifications and upgrades. The result of this trend is that hybrid HSIs are created, i.e., HSIs containing a mixture of conventional (analog) and advanced (digital) technology. The purpose of the present research is to define the potential effects of hybrid HSIs on personnel performance and plant safety and to develop human factors guidance for safety reviews of them where necessary. In support of this objective, human factors issues associated with hybrid HSIs were identified. The issues were evaluated for their potential significance to plantmore » safety, i.e., their human performance concerns have the potential to compromise plant safety. The issues were then prioritized and a subset was selected for design review guidance development.« less
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs
NASA Astrophysics Data System (ADS)
Ieki, K.
2016-07-01
The MEG experiment searches for the muon lepton flavor violating decay, μ+ →e+ γ. An upgrade of the experiment is ongoing, aiming at reaching a sensitivity of Br(μ+ →e+ γ) = 4 ×10-14, an order of magnitude better than the sensitivity of the current MEG. To achieve this goal, all of the detectors are being upgraded. In MEG, the energy, position and timing of the gamma ray were measured by a liquid Xe calorimeter, which consists of 900 l of liquid Xe and 846 2-in. round-shaped photo-multiplier tubes (PMTs). In the upgrade, the granularity at the gamma ray incident face will be improved by replacing 216 PMTs with 4092 SiPMs (MPPCs) with an active area of 12×12 mm2 each. The energy resolution for the gamma ray is expected to improve by a factor of 2, because the efficiency to collect scintillation light will become more uniform. The position resolution is also expected to improve by a factor of 2. In collaboration with Hamamatsu Photonics K.K., we have successfully developed a high performance MPPC for our detector. It has excellent photon detection efficiency for the liquid xenon scintillation light in VUV range. The size of the chips is large so that it can cover large area with a manageable number of readout channels. The characteristics of the MPPCs are being tested in liquid Xe, and also at the room temperature. The results of the tests will be presented, together with the expected performance of the upgraded detector.
Overview of the ATLAS Insertable B-Layer (IBL) Project
NASA Astrophysics Data System (ADS)
Kagan, M. A.
2014-06-01
The first upgrade for the Pixel Detector will be a new pixel layer which is currently under construction and will be installed during the first shutdown of the LHC machine, in 2013-14. The new detector, called the Insertable B-layer (IBL), will be installed between the existing Pixel Detector and a new, smaller radius beam-pipe. Two different silicon sensor technologies, planar n-in-n and 3D, will be used, connected with the new generation 130nm IBM CMOS FE-I4 readout chip via solder bump-bonds. A production quality control test bench was set up in the ATLAS inner detector assembly clean room to verify and rate the performance of the detector elements before integration around the beam-pipe. An overview of the IBL project, of the module design, the qualification for these sensor technologies, the integration quality control setups and recent results in the construction of this full scale new concept detector is discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory...-Power Reactors: Format and Content,'' for instrumentation and control upgrades and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review...
Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project
NASA Technical Reports Server (NTRS)
Harp, Janice Leshay
2014-01-01
This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.
Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Robert C.; Smith, Ryan; Wright, Mark
This project is part of a collaboration effort between Iowa State University (ISU), University of Oklahoma (OK) and Pacific Northwest National Laboratory (PNNL). The purpose of this project is to stabilize bio-oil fractions and improve their suitability for insertion into petroleum refineries. Bio-oil from fast pyrolysis of biomass is a complex mixture of unstable organic compounds. These organic compounds react under standard room conditions resulting in increases in bio-oil viscosity and water content – both detrimental for bio-oil storage and transportation. This study employed fractionation and upgrading systems to improve the stability of bio-oil. The fractionation system consists of amore » series of condensers, and electrostatic precipitators designed to separate bio-oil into five fractions: soluble carbohydrates (SF1&2), clean phenolic oligomers (CPO) and middle fraction (SF3&4), light oxygenates (SF5). A two-stage upgrading process was designed to process bio-oil stage fractions into stable products that can be inserted into a refinery. In the upgrading system, heavy and middle bio-oil fractions were upgraded into stable oil via cracking and subsequent hydrodeoxygenation. The light oxygenate fraction was steam reformed to provide a portion of requisite hydrogen for hydroprocessing. Hydrotreating and hydrocracking employed hydrogen from natural gas, fuel gas and light oxygenates reforming. The finished products from this study consist of gasoline- and diesel-blend stock fuels.« less
Vacuum system of the cyclotrons in VECC, Kolkata
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roy, Anindya; Bhole, R.B.; Akhtar, J.
2011-07-01
The vacuum system of the K=130 Room Temperature Cyclotron (RTC) (operational since 1978) has been recently modernized and the same of the K{sub bend}=520 Superconducting Cyclotron (SCC), currently under commissioning, is being deployed for remote monitoring and control. The vacuum system of RTC is designed to achieve and maintain vacuum level of 2 X 10{sup -6} mbar inside 23 m{sup 3} volume of Resonator tank and DEE tank. This has been upgraded by replacing several valves, Freon units, gauges and pumps. The relay based manual control system has been replaced by PLC based automated system. The SCC vacuum system alsomore » has an elaborate arrangement comprising of turbo molecular pumping modules with associated isolation valves and characteristic gauges. This paper describes essential elements, typically used to obtain high (1X10{sup -7} mbar) vacuum using rotary pumps, diffusion pumps and cold traps/turbo-molecular pumps and other system components such as valves, gauges and baffles. The supervisory control methodology/scheme of both the vacuum systems, developed in-house using EPICS (Experimental Physics and Industrial Control System), a standard open-source software tool for designing distributed control system, is also elaborated here. (author)« less
Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System
NASA Astrophysics Data System (ADS)
Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.
2011-03-01
The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carruth, R.C.; Sotos, W.G.
As the nation`s nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant`s protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade.
Thermal Vacuum Control Systems Options for Test Facilities
NASA Technical Reports Server (NTRS)
Marchetti, John
2008-01-01
This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.
Field Quality Measurements in the FNAL Twin-Aperture 11 T Dipole for LHC Upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strauss, T.; Apollinari, G.; Apollinari, G.
2016-11-08
FNAL and CERN are developing an 11 T Nb3Sn dipole suitable for installation in the LHC to provide room for additional collimators. Two 1 m long collared coils previously tested at FNAL in single-aperture dipole configuration were assembled into the twin-aperture configuration and tested including magnet quench performance and field quality. The results of magnetic measurements are reported and discussed in this paper.
NASA Astrophysics Data System (ADS)
Ballarino, A.; Giannelli, S.; Jacquemod, A.; Leclercq, Y.; Ortiz Ferrer, C.; Parma, V.
2017-12-01
The High Luminosity LHC (HL-LHC) is a project aiming to upgrade the Large Hadron Collider (LHC) after 2020-2025 in order to increase the integrated luminosity by about one order of magnitude and extend the operational capabilities until 2035. The upgrade of the focusing triplet insertions for the Atlas and CMS experiments foresees using superconducting magnets operating in a pressurised superfluid helium bath at 1.9 K. The increased radiation levels from the particle debris produced by particle collisions in the experiments require that the power converters are placed in radiation shielded zones located in a service gallery adjacent to the main tunnel. The powering of the magnets from the gallery is achieved by means of MgB2 superconducting cables in a 100-m long flexible cryostat transfer line, actively cooled by 4.5 K to 20 K gaseous helium generated close to the magnets. At the highest temperature end, the helium flow cools the High Temperature Superconducting (HTS) current leads before being recovered at room temperature. At the magnet connection side, a dedicated connection box allows connection to the magnets and a controlled boil-off production of helium for the cooling needs of the powering system. This paper presents the overall concept of the cryostat system from the magnet connection boxes, through the flexible cryostat transfer line, to the connection box of the current leads.
Mobile Telemetry Van Remote Control Upgrade
2012-05-17
Advantages of Remote Control System Upgrade • Summary Overview • Remote control of Telemetry Mobile Ground Support ( TMGS ) Van proposed to allow...NWC) personnel provided valuable data for full-function remote control of telemetry tracking vans Background • TMGS Vans support Flight Test...control capability from main TM site at Building 5790 currently allows support via TMGS Van at nearby C- 15 Site, Plant 42 in Palmdale, and as far
Results of using the NSTX-U Plasma Control System for scenario development
NASA Astrophysics Data System (ADS)
Boyer, M. D.; Battaglia, D. J.; Gates, D. A.; Gerhardt, S.; Menard, J.; Mueller, D.; Myers, C. E.; Ferron, J.; Sabbagh, S.; NSTX-U Team
2016-10-01
To best use the new capabilities of NSTX-U (e.g., higher toroidal field and additional, more distributed heating and current drive sources) and to achieve the operational goals of the program, major upgrades to the Plasma Control System have been made. These include improvements to vertical control, real-time equilibrium reconstruction, and plasma boundary shape control and the addition of flexible algorithms for beam modulation and gas injection to control the upgraded actuators in real-time, enabling their use in algorithms for stored energy and profile control. Control system commissioning activities have so far focused on vertical position and shape control. The upgraded controllers have been used to explore the vertical stability limits in inner wall limited and diverted discharges, and control of X-point and strike point locations has been demonstrated and is routinely used. A method for controlling the mid-plane inner gap, a challenge for STs, has also been added to improve reproducible control of diverted discharges. A supervisory shutdown handling algorithm has also been commissioned to ramp the plasma down and safely turn off actuators after an event such as loss of vertical control. Use of the upgrades has contributed to achieving 1MA, 0.65T scenarios with greater than 1s pulse length. Work supported by U.S. D.O.E. Contract No. DE-AC02-09CH11466.
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, training takes place atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility is prepared to conduct a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2011-02-15
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training on a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
Recent progress and tests of radiation resistant impregnation materials for Nb3Sn coils
NASA Astrophysics Data System (ADS)
Bossert, R.; Krave, S.; Ambrosio, G.; Andreev, N.; Chlachidze, G.; Nobrega, A.; Novitski, I.; Yu, M.; Zlobin, A. V.
2014-01-01
Fermilab is collaborating with Lawrence Berkeley National Laboratory (LBNL) and Brookhaven National Laboratory (BNL) (US-LARP collaboration) to develop a large-aperture Nb3Sn superconducting quadrupole for the Large Hadron Collider (LHC) luminosity upgrade. An important component of this work is the development of materials that are sufficiently radiation resistant for use in critical areas of the upgrade. This paper describes recent progress in characterization of materials, including the baseline CTD101K epoxy, cyanate ester blends, and Matrimid 5292, a bismaleimide-based system. Structural properties of "ten stacks" of cable impregnated with these materials are tested at room and cryogenic temperatures and compared to the baseline CT-101K. Experience with potting 1 and 2 meter long coils with Matrimid 5292 are described. Test results of a single 1-m coil impregnated with Matrimid 5292 are reported and compared to similar coils impregnated with the traditional epoxy.
NASA Technical Reports Server (NTRS)
Saltsman, J. F.; Halford, G. R.
1984-01-01
A hydrodynamic air bearing with a compliment surface is used in the gas generator of an upgraded automotive gas turbine engine. In the prototype design, the compliant surface is a thin foil spot welded at one end to the bearing cartridge. During operation, the foil failed along the line of spot welds which acted as a series of stress concentrators. Because of its higher degree of geometric uniformity, electron beam welding of the foil was selected as an alternative to spot welding. Room temperature bending fatigue tests were conducted to determine the fatigue resistance of the electron beam welded foils. Equations were determined relating cycles to crack initiation and cycles to failure to nominal total strain range. A scaling procedure is presented for estimating the reduction in cyclic life when the foil is at its normal operating temperature of 260 C (500 F).
NASA Astrophysics Data System (ADS)
Schaller, S. C.; Bjorklund, E. A.; Carr, G. P.; Faucett, J. A.; Oothoudt, M. A.
1997-05-01
The Los Alamos Neutron Scattering Center (LANSCE) Proton Storage Ring (PSR) control system upgrade was completed in 1996. In previous work, much of a PDP-11-based control system was replaced with Experimental Physics and Industrial Control System (EPICS) controls. Several parts of the old control system which used a VAX for operator displays and direct access to a CAMAC serial highway still remained. The old system was preserved as a "fallback" if the new EPICS-based system had problems. The control system upgrade completion included conversion of several application programs to EPICS-based operator interfaces, moving some data acquisition hardware to EPICS Input-Output Controllers (IOCs), and the implementation of new gateway software to complete the overall control system interoperability. Many operator interface (OPI) screens, written by LANSCE operators, have been incorporated in the new system. The old PSR control system hardware was removed. The robustness and reliability of the new controls obviated the need for a fallback capability.
2013-06-01
cooling water, fire water, domestic water, sanitary systems, con- trol room, and other requirements which would be utilized in place. Constructing a new...communica- tions requirements, sanitary sewer, and electrical connections back to the PAR building are expected to be routed through the new...Pembina Delta Aquifer is underlain by shale bedrock and by glacial till and thick deposits of lake clay and silt. Small aquifers within the
Sutton, Jonathan E.; Danielson, Thomas; Beste, Ariana; ...
2017-11-14
C-H bond breaking is important for industrial commodity and specialty chemical transformations, including the upgrading of alcohols. Small primary alcohols – methanol and ethanol – are used industrially as precursors for the corresponding aldehydes at industrial scales. However, upgrading these primary alcohols involves C-H bond breaking and the processes are run at elevated temperatures (> 200 °C). In this work, new understanding from temperature programmed reaction (TPR) studies with methanol over a CeO 2(111) surface show the C-H bond breaking and the subsequent desorption of formaldehyde, even below room temperature. This is of particular interests because CeO 2 is amore » naturally abundant, inexpensive metal oxide. We combine density functional theory (DFT) and kinetic Monte Carlo (KMC) to simulate the TPR of methanol on CeO2. Our simulations show that the low temperature C H bond breaking occurs via disproportionation of adjacent methoxy species to form methanol and formaldehyde which each then desorb. We further show from DFT calculations that the same transition state with comparably low activation energies should be possible for other sustainable primary alcohols, with ethanol, 1-propanol, and 1-butanol having been explicitly calculated. In conclusion, these findings point out a new class of transition states to search for in seeking low temperature C-H bond breaking over inexpensive metal oxides.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutton, Jonathan E.; Danielson, Thomas; Beste, Ariana
C-H bond breaking is important for industrial commodity and specialty chemical transformations, including the upgrading of alcohols. Small primary alcohols – methanol and ethanol – are used industrially as precursors for the corresponding aldehydes at industrial scales. However, upgrading these primary alcohols involves C-H bond breaking and the processes are run at elevated temperatures (> 200 °C). In this work, new understanding from temperature programmed reaction (TPR) studies with methanol over a CeO 2(111) surface show the C-H bond breaking and the subsequent desorption of formaldehyde, even below room temperature. This is of particular interests because CeO 2 is amore » naturally abundant, inexpensive metal oxide. We combine density functional theory (DFT) and kinetic Monte Carlo (KMC) to simulate the TPR of methanol on CeO2. Our simulations show that the low temperature C H bond breaking occurs via disproportionation of adjacent methoxy species to form methanol and formaldehyde which each then desorb. We further show from DFT calculations that the same transition state with comparably low activation energies should be possible for other sustainable primary alcohols, with ethanol, 1-propanol, and 1-butanol having been explicitly calculated. In conclusion, these findings point out a new class of transition states to search for in seeking low temperature C-H bond breaking over inexpensive metal oxides.« less
A Cooling System for the EAPU Shuttle Upgrade
NASA Technical Reports Server (NTRS)
Tongue, Stephen; Guyette, Greg; Irbeck, Bradley
2001-01-01
The Shuttle orbiter currently uses hydrazine-powered APU's for powering its hydraulic system pumps. To enhance vehicle safety and reliability, NASA is pursuing an APU upgrade where the hydrazine powered turbine is replaced by an electric motor pump and battery power supply. This EAPU (Electric APU) upgrade presents several thermal control challenges most notably the new requirement for moderate temperature control of high-power electron ics at 132 of (55.6 C). This paper describes how the existing Water Spray Boiler (WSB), which currently cools the hydraulic fluid and APU lubrication oil, is being modified to provide EAPU thermal management.
High Speed Operation and Testing of a Fault Tolerant Magnetic Bearing
NASA Technical Reports Server (NTRS)
DeWitt, Kenneth; Clark, Daniel
2004-01-01
Research activities undertaken to upgrade the fault-tolerant facility, continue testing high-speed fault-tolerant operation, and assist in the commission of the high temperature (1000 degrees F) thrust magnetic bearing as described. The fault-tolerant magnetic bearing test facility was upgraded to operate to 40,000 RPM. The necessary upgrades included new state-of-the art position sensors with high frequency modulation and new power edge filtering of amplifier outputs. A comparison study of the new sensors and the previous system was done as well as a noise assessment of the sensor-to-controller signals. Also a comparison study of power edge filtering for amplifier-to-actuator signals was done; this information is valuable for all position sensing and motor actuation applications. After these facility upgrades were completed, the rig is believed to have capabilities for 40,000 RPM operation, though this has yet to be demonstrated. Other upgrades included verification and upgrading of safety shielding, and upgrading control algorithms. The rig will now also be used to demonstrate motoring capabilities and control algorithms are in the process of being created. Recently an extreme temperature thrust magnetic bearing was designed from the ground up. The thrust bearing was designed to fit within the existing high temperature facility. The retrofit began near the end of the summer, 04, and continues currently. Contract staff authored a NASA-TM entitled "An Overview of Magnetic Bearing Technology for Gas Turbine Engines", containing a compilation of bearing data as it pertains to operation in the regime of the gas turbine engine and a presentation of how magnetic bearings can become a viable candidate for use in future engine technology.
Combination sound and vibration isolation curb for rooftop air-handling systems
NASA Astrophysics Data System (ADS)
Paige, Thomas S.
2005-09-01
This paper introduces the new Model ESSR Sound and Vibration Isolation Curb manufactured by Kinetics Noise Control, Inc. This product was specially designed to address all of the common transmission paths associated with noise and vibration sources from roof-mounted air-handling equipment. These include: reduction of airborne fan noise in supply and return air ductwork, reduction of duct rumble and breakout noise, reduction of direct airborne sound transmission through the roof deck, and reduction of vibration and structure-borne noise transmission to the building structure. Upgrade options are available for increased seismic restraint and wind-load protection. The advantages of this new system over the conventional approach of installing separate duct silencers in the room ceiling space below the rooftop unit are discussed. Several case studies are presented with the emphasis on completed projects pertaining to classrooms and school auditorium applications. Some success has also been achieved by adding active noise control components to improve low-frequency attenuation. This is an innovative product designed for conformance with the new classroom acoustics standard ANSI S12.60.
NASA Technical Reports Server (NTRS)
Cramer, Christopher J.; Wright, James D.; Simmons, Scott A.; Bobbitt, Lynn E.; DeMoss, Joshua A.
2015-01-01
The paper will present a brief background of the previous data acquisition system at the National Transonic Facility (NTF) and the reasoning and goals behind the upgrade to the current Test SLATE (Test Software Laboratory and Automated Testing Environments) data acquisition system. The components, performance characteristics, and layout of the Test SLATE system within the NTF control room will be discussed. The development, testing, and integration of Test SLATE within NTF operations will be detailed. The operational capabilities of the system will be outlined including: test setup, instrumentation calibration, automatic test sequencer setup, data recording, communication between data and facility control systems, real time display monitoring, and data reduction. The current operational status of the Test SLATE system and its performance during recent NTF testing will be highlighted including high-speed, frame-by-frame data acquisition with conditional sampling post-processing applied. The paper concludes with current development work on the system including the capability for real-time conditional sampling during data acquisition and further efficiency enhancements to the wind tunnel testing process.
Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade
NASA Astrophysics Data System (ADS)
Graça, S.; Santos, J.; Manso, M. E.
2004-10-01
The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut für Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusão Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodman, Dan
The goal of this project is to upgrade existing building facilities owned by Nunamiut Corporation in Anaktuvuk Pass, AK. The upgrades mentioned will include lighting, heating system, insulation and smart control units designed to increase the energy efficiency of Village Corporation owned buildings.
Research of TREETOPS Structural Dynamics Controls Simulation Upgrade
NASA Technical Reports Server (NTRS)
Yates, Rose M.
1996-01-01
Under the provisions of contract number NAS8-40194, which was entitled 'TREETOPS Structural Dynamics and Controls Simulation System Upgrade', Oakwood College contracted to produce an upgrade to the existing TREETOPS suite of analysis tools. This suite includes the main simulation program, TREETOPS, two interactive preprocessors, TREESET and TREEFLX, an interactive post processor, TREEPLOT, and an adjunct program, TREESEL. A 'Software Design Document', which provides descriptions of the argument lists and internal variables for each subroutine in the TREETOPS suite, was established. Additionally, installation guides for both DOS and UNIX platforms were developed. Finally, updated User's Manuals, as well as a Theory Manual, were generated.
A compact, smart Langmuir Probe control module for MAST-Upgrade
NASA Astrophysics Data System (ADS)
Lovell, J.; Stephen, R.; Bray, S.; Naylor, G.; Elmore, S.; Willett, H.; Peterka, M.; Dimitrova, M.; Havranek, A.; Hron, M.; Sharples, R.
2017-11-01
A new control module for the MAST-Upgrade Langmuir Probe system has been developed. It is based on a Xilinx Zynq FPGA, which allows for excellent configurability and ease of retrieving data. The module is capable of arbitrary bias voltage waveform generation, and digitises current and voltage readings from 16 probes. The probes are biased and measured one at a time in a time multiplexed fashion, with the multiplexing sequence completely configurable. In addition, simultaneous digitisation of the floating potential of all unbiased probes is possible. A suite of these modules, each coupled with a high voltage amplifier, enables biasing and digitisation of 640 Langmuir Probes in the MAST-Upgrade Super-X divertor. The system has been successfully tested on the York Linear Plasma Device and on the COMPASS tokamak. It will be installed on MAST-Upgrade ready for operations in 2018.
Modular Filter and Source-Management Upgrade of RADAC
NASA Technical Reports Server (NTRS)
Lanzi, R. James; Smith, Donna C.
2007-01-01
In an upgrade of the Range Data Acquisition Computer (RADAC) software, a modular software object library was developed to implement required functionality for filtering of flight-vehicle-tracking data and management of tracking-data sources. (The RADAC software is used to process flight-vehicle metric data for realtime display in the Wallops Flight Facility Range Control Center and Mobile Control Center.)
An observatory control system for the University of Hawai'i 2.2m Telescope
NASA Astrophysics Data System (ADS)
McKay, Luke; Erickson, Christopher; Mukensnable, Donn; Stearman, Anthony; Straight, Brad
2016-07-01
The University of Hawai'i 2.2m telescope at Maunakea has operated since 1970, and has had several controls upgrades to date. The newest system will operate as a distributed hierarchy of GNU/Linux central server, networked single-board computers, microcontrollers, and a modular motion control processor for the main axes. Rather than just a telescope control system, this new effort is towards a cohesive, modular, and robust whole observatory control system, with design goals of fully robotic unattended operation, high reliability, and ease of maintenance and upgrade.
Application of programmable logic controllers to space simulation
NASA Technical Reports Server (NTRS)
Sushon, Janet
1992-01-01
Incorporating a state-of-the-art process control and instrumentation system into a complex system for thermal vacuum testing is discussed. The challenge was to connect several independent control systems provided by various vendors to a supervisory computer. This combination will sequentially control and monitor the process, collect the data, and transmit it to color a graphic system for subsequent manipulation. The vacuum system upgrade included: replacement of seventeen diffusion pumps with eight cryogenic pumps and one turbomolecular pump, replacing a relay based control system, replacing vacuum instrumentation, and upgrading the data acquisition system.
System and process for upgrading hydrocarbons
Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.
2015-08-25
In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.
GMRT servo system : overview of the upgrades
NASA Astrophysics Data System (ADS)
Bagde, Shailendra
The servo system of the GMRT, designed in the early 1990s by BARC and subsequently commissioned in the antennas by 1996, is a classical nested loop control system. Some of its major subsystems are undergoing significant upgrades to increase reliability, reduce maintenance and overcome obsolescence of components. These include the solid-state interlock system, a PC104 based servo control computer, and advanced BLDC drives and motors.
Selective catalytic two-step process for ethylene glycol from carbon monoxide
Dong, Kaiwu; Elangovan, Saravanakumar; Sang, Rui; Spannenberg, Anke; Jackstell, Ralf; Junge, Kathrin; Li, Yuehui; Beller, Matthias
2016-01-01
Upgrading C1 chemicals (for example, CO, CO/H2, MeOH and CO2) with C–C bond formation is essential for the synthesis of bulk chemicals. In general, these industrially important processes (for example, Fischer Tropsch) proceed at drastic reaction conditions (>250 °C; high pressure) and suffer from low selectivity, which makes high capital investment necessary and requires additional purifications. Here, a different strategy for the preparation of ethylene glycol (EG) via initial oxidative coupling and subsequent reduction is presented. Separating coupling and reduction steps allows for a completely selective formation of EG (99%) from CO. This two-step catalytic procedure makes use of a Pd-catalysed oxycarbonylation of amines to oxamides at room temperature (RT) and subsequent Ru- or Fe-catalysed hydrogenation to EG. Notably, in the first step the required amines can be efficiently reused. The presented stepwise oxamide-mediated coupling provides the basis for a new strategy for selective upgrading of C1 chemicals. PMID:27377550
CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB)
DOE Office of Scientific and Technical Information (OSTI.GOV)
I.E. Campisi; B. Carpenter; G.K. Davis
2001-06-01
The planned upgrade of the CEBAF electron accelerator includes the development of an improved cryomodule. Several components differ substantially from the original CEBAF cryomodule; these include: the new 7-cell, 1.5 GHz cavities with integral helium vessel, a new, backlash-free cavity tuner, the waveguide coupler with its room-temperature ceramic window, and the HOM damping filters. In order to test the design features and performance of the new components, a horizontal cryostat (Horizontal Test Bed) has been constructed which allows testing with a turn around time of less than three weeks. This cryostat provides the environment for testing one or two cavities,more » with associated auxiliary components, in a condition similar to that of a real cryomodule. A series of tests has been performed on a prototype 7-cell cavity and the above-mentioned systems. In this paper the results of the tests on the cryostat, on the cavity performance, on its coupler, on the tuner characteristics, and on the microphonics behavior will be reported.« less
Black, Stuart; Ferrell, Jack R
2017-02-07
Carbonyl compounds present in bio-oils are known to be responsible for bio-oil property changes upon storage and during upgrading. Specifically, carbonyls cause an increase in viscosity (often referred to as 'aging') during storage of bio-oils. As such, carbonyl content has previously been used as a method of tracking bio-oil aging and condensation reactions with less variability than viscosity measurements. Additionally, carbonyls are also responsible for coke formation in bio-oil upgrading processes. Given the importance of carbonyls in bio-oils, accurate analytical methods for their quantification are very important for the bio-oil community. Potentiometric titration methods based on carbonyl oximation have long been used for the determination of carbonyl content in pyrolysis bio-oils. Here, we present a modification of the traditional carbonyl oximation procedures that results in less reaction time, smaller sample size, higher precision, and more accurate carbonyl determinations. While traditional carbonyl oximation methods occur at room temperature, the Faix method presented here occurs at an elevated temperature of 80 °C.
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...
The upgrade of the H.E.S.S. cameras
NASA Astrophysics Data System (ADS)
Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; de Naurois, Mathieu; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois
2017-01-01
The High Energy Stereoscopic System (H.E.S.S.) is an array of five imaging atmospheric Cherenkov telescopes (IACT) located in Namibia. In order to assure the continuous operation of H.E.S.S. at its full sensitivity until and possibly beyond the advent of CTA, the older cameras, installed in 2003, are currently undergoing an extensive upgrade. Its goals are reducing the system failure rate, reducing the dead time and improving the overall performance of the array. All camera components have been upgraded, except the mechanical structure and the photo-multiplier tubes (PMTs). Novel technical solutions have been introduced: the upgraded readout electronics is based on the NECTAr analog memory chip; the control of the hardware is carried out by an FPGA coupled to an embedded ARM computer; the control software was re-written from scratch and it is based on modern C++ open source libraries. These hardware and software solutions offer very good performance, robustness and flexibility. The first camera was fielded in July 2015 and has been successfully commissioned; the rest is scheduled to be upgraded in September 2016. The present contribution describes the design, the testing and the performance of the new H.E.S.S. camera and its components.
[On-line data management system using a portable blood gas analyzer in the operating room].
Shimosato, G; Ibuki, T; Hirata, M; Shigemi, K; Tanaka, Y
2000-03-01
It is very important to establish a clinical testing system which is not only prompt, simple and accurate but also safe for the patients and medical staff in the operating room, emergency room and intensive care unit. In our institution an i-STAT portable blood gas analyser has been widely used for point of care testing in all the operating rooms. This clinical testing system has been upgraded by adding an i-STAT communication protocol to our online data management system. The analysed data transmitted by the i-STAT as an infrared signal is transformed to an electronic signal through the IR link and sent to the central data station (CDS) via RS232C. The data received by the CDS is then sent to the upper grade computer system where the data is recorded on the hard disk. One advantage of this system is that it is connected to the hospital computer system. Not only does this new system meet the need for accurate, safe, effective and economical laboratory testing, but also retrospective and multifactorial analysis of intraoperative events can be easily carried out. In the future this system can be applied to telemedicine through the Internet and contribute to the treatment of critically ill patients.
NASA Astrophysics Data System (ADS)
Dopke, J.; Falchieri, D.; Flick, T.; Gabrielli, A.; Kugel, A.; Mättig, P.; Morettini, P.; Polini, A.; Schroer, N.
2011-01-01
The first upgrade for the ATLAS Pixel Detector will be an additional layer, which is called IBL (Insertable B-Layer). To readout this new layer, built from new electronics, an update of the readout electronics is necessary. The aim is to develop a system which is capable to read out at a higher bandwidth, but also compatible with the existing system to be integrated into it. This paper describes the necessary development to reach a new readout system, concentrating on the requirements of a newly designed Back of Crate card as the optical interface in the counting room.
DOT National Transportation Integrated Search
2015-06-01
FRA Task Order 314 upgraded the Positive Train Control (PTC) Test Bed at the Transportation Technology Center to support : testing of PTC systems, components, and related equipment associated with the Advanced Civil Speed Enforcement System : (ACSES)...
Mechanical Property Allowables Generated for the Solid Rocket Booster Composite Note Cap
NASA Technical Reports Server (NTRS)
Hodge, A. J.
2000-01-01
Mechanical property characterization was performed on AS4/3501-6 graphite/epoxy and SC350G syntactic foam for the SRB Composite Nose Cap Shuttle Upgrades Project. Lamina level properties for the graphite/epoxy were determined at room temperature, 240 F, 350 F, 480 F, 600 F, and 350 F after a cycle to 600 F. Graphite/epoxy samples were moisture conditioned prior to testing. The syntactic foam material was tested at room temperature, 350 F, and 480 F. A high-temperature test facility was developed at MSFC. Testing was performed with quartz lamp heaters and high resistance heater strips. The thermal history profile of the nose cap was simulated in order to test materials at various times during launch. A correlation study was performed with Southern Research Institute to confirm the test methodology and validity of test results. A-basis allowables were generated from the results of testing on three lots of material.
NASA Astrophysics Data System (ADS)
Fernández-Martínez, Pablo; Flores, D.; Hidalgo, S.; Quirion, D.; Durà, R.; Ullán, M.
2018-01-01
A new vertical JFET transistor has been recently developed at the IMB-CNM, taking advantage of a deep-trenched 3D technology to achieve vertical conduction and low switch-off voltage. The silicon V-JFET transistors were mainly conceived to work as rad-hard protection switches for the renewed HV powering scheme (HV-MUX) of the ATLAS upgraded tracker. This work presents the features of the first batch of V-JFETs produced at the IMB-CNM clean room, together with the results of a full pre-irradiation characterization of the fabricated prototypes. Details of the technological process are provided and the outcome quality is also evaluated with the aid of reverse engineering techniques. Concerning the electrical performance of the prototypes, promising results were obtained, already meeting most of the HV-MUX specifications, both at room and below-zerotemperatures.
NASA Technical Reports Server (NTRS)
Klos, J.; Brown, S. A.
2002-01-01
A technique to measure the radiated acoustic intensity and transmission loss of panels is documented in this paper. This facility has been upgraded to include a test fixture that scans the acoustic intensity radiated from a panel on the anechoic receiving room side of the transmission loss window. The acoustic intensity incident on the panel from the reverberant side of the transmission loss window is estimated from measurements made using six stationary microphones in the reverberant source room. From the measured incident and radiated intensity, the sound power transmission loss is calculated. The setup of the facility and data acquisition system are documented. A transmission loss estimate of a typical panel is shown. The measurement-to-measurement and setup-to-setup repeatability of the transmission loss estimate are assessed. Conclusions are drawn about the ability to measure changes in transmission loss due to changes in panel construction.
NSTX-U Control System Upgrades
Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; ...
2014-06-01
The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore » port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less
Optical attenuation mechanism upgrades, MOBLAS, and TLRS systems
NASA Technical Reports Server (NTRS)
Eichinger, Richard; Johnson, Toni; Malitson, Paul; Oldham, Thomas; Stewart, Loyal
1993-01-01
This poster presentation describes the Optical Attenuation Mechanism (OAM) Upgrades to the MOBLAS and TLRS Crustal Dynamics Satellite Laser Ranging (CDSLR) systems. The upgrades were for the purposes of preparing these systems to laser range to the TOPEX/POSEIDON spacecraft when it will be launched in the summer of 1992. The OAM permits the laser receiver to operate over the expected large signal dynamic range from TOPEX/POSEIDON and it reduces the number of pre- and post-calibrations for each satellite during multi-satellite tracking operations. It further simplifies the calibration bias corrections that had been made due to the pass-to-pass variation of the photomultiplier supply voltage and the transmit filter glass thickness. The upgrade incorporated improvements to the optical alignment capability of each CDSLR system through the addition of a CCD camera into the MOBLAS receive telescope and an alignment telescope onto the TLRS optical table. The OAM is stepper motor and microprocessor based; and the system can be controlled either manually by a control switch panel or computer controlled via an EIA RS-232C serial interface. The OAM has a neutral density (ND) range of 0.0 to 4.0 and the positioning is absolute referenced in steps of 0.1 ND. Both the fixed transmit filter and the daylight filter are solenoid actuated with digital inputs and outputs to and from the OAM microprocessor. During automated operation, the operator has the option to overide the remote control and control the OAM system via a local control switch panel.
AN INTERNET RACK MONITOR-CONTROLLER FOR APS LINAC RF ELECTRONICS UPGRADE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, Hengjie; Smith, Terry; Nassiri, Alireza
To support the research and development in APS LINAC area, the existing LINAC rf control performance needs to be much improved, and thus an upgrade of the legacy LINAC rf electronics becomes necessary. The proposed upgrade plan centers on the concept of using a modern, network-attached, rackmount digital electronics platform –Internet Rack Monitor-Controller (or IRMC) to achieve the goal of modernizing the rf electronics at a lower cost. The system model of the envisioned IRMC is basically a 3-tier stack with a high-performance DSP in the mid-layer to perform the core tasks of real-time rf data processing and controls. Themore » Digital Front-End (DFE) attachment layer at bottom bridges the applicationspecific rf front-ends to the DSP. A network communication gateway, together with an embedded event receiver (EVR) in the top layer merges the Internet Rack MonitorController node into the networks of the accelerator controls infrastructure. Although the concept is very much in trend with today’s Internet-of-Things (IoT), this implementation has actually been used in the accelerators for over two decades.« less
Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.
2016-09-23
The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.
The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.
Snowflake divertor configuration studies for NSTX-Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soukhanovskii, V A
2011-11-12
Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand controlmore » of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.« less
NASA Astrophysics Data System (ADS)
Lyakhovets, M. V.; Wenger, K. G.; Myshlyaev, L. P.; Shipunov, M. V.; Grachev, V. V.; Melkozerov, M. Yu; Fairoshin, Sh A.
2018-05-01
The experience of modernization of the automation control system of technological processes at the preparation plant under the conditions of technical re-equipment of the preparation plant “Barzasskoye Tovarischestvo” LLC (Berezovsky) is considered. The automated process control systems (APCS), the modernization goals and the ways to achieve them are indicated, the main subsystems of the integrated APCS are presented, the enlarged functional and technical structure of the upgraded system is given. The procedure for commissioning an upgraded system is described.
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
NASA Astrophysics Data System (ADS)
Boyer, M. D.; Battaglia, D. J.; Mueller, D.; Eidietis, N.; Erickson, K.; Ferron, J.; Gates, D. A.; Gerhardt, S.; Johnson, R.; Kolemen, E.; Menard, J.; Myers, C. E.; Sabbagh, S. A.; Scotti, F.; Vail, P.
2018-03-01
The upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgraded to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.
The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory
NASA Technical Reports Server (NTRS)
Jones, Ross M.
2005-01-01
JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.
2016-03-23
A truck sprays water in front of NASA’s upgraded crawler-transporter 2 (CT-2) to control dust as it begins the trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.
Linam Ranch cryogenic gas plant: A design and operating retrospective
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harwell, L.J.; Kuscinski, J.
1999-07-01
GPM Gas Corporation's Linam Ranch Gas Plant is the processing hub of their southeastern New Mexico gathering system, producing a y-grade NGL product which is pipelined primarily to the Phillips petrochemical complex at Sweeney, Texas, GPM acquired the facility near Hobbs, N.M. late in 1994 when it was still operating as a refrigerated lean oil plant, renamed it, and commenced an upgrade project culminating in its conversion to a high recovery cryogenic facility in early 1996 with a processing capacity of 150 MMscfd. Facilities that were upgraded included inlet liquids receiving and handling, the amine system, mol sieve dehydration, themore » sulfur recovery unit, inlet compression, and the propane refrigeration system. A Foxboro I/A DCS was also placed into operation. The lean oil system was replaced with a high recovery turboexpander unit supplied by KTI Fish based on their Flash Vapor Reflux (FVR) process. Resulting ethane recovery was greater than 95% for the new facilities. New residue compression units were installed including steam generators on the turbine exhausts, which complemented the existing plant steam system. During the three years since conversion to cryogenic operation, GPM has steadily improved plant operations. Expansion of the mol sieve dehydration system and retrofit of evaporation combustion air cooling on gas turbines have expanded nameplate capacity to 170 MMscfd while maintaining ethane recovery at 95%. Future expansion to 200 MMscfd with high recovery is achievable. In addition, creative use of the Foxboro DCS has been employed to implement advanced control schemes for handling inlet liquid slugs, gas and amine balancing for parallel amine contactors, improved sulfur recovery unit (SRU) trim air control, and constraint-based process optimization to maximize horsepower utilization and ethane recovery. Some challenges remain, leaving room for additional improvements. However, GPM's progress so far has resulted in a current ethane recovery level in excess of 97% when processing gas at the original design throughput of 150 MMscfd.« less
Thermal System Upgrade of the Space Environment Simulation Test Chamber
NASA Technical Reports Server (NTRS)
Desai, Ashok B.
1997-01-01
The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.
A Major Upgrade of the H.E.S.S. Cherenkov Cameras
NASA Astrophysics Data System (ADS)
Lypova, Iryna; Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; de Naurois, Mathieu; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois
2017-03-01
The High Energy Stereoscopic System (H.E.S.S.) is an array of imaging atmospheric Cherenkov telescopes (IACTs) located in Namibia. It was built to detect Very High Energy (VHE, >100 GeV) cosmic gamma rays, and consists of four 12 m diameter Cherenkov telescopes (CT1-4), built in 2003, and a larger 28 m telescope (CT5), built in 2012. The larger mirror surface of CT5 permits to lower the energy threshold of the array down to 30 GeV. The cameras of CT1-4 are currently undergoing an extensive upgrade, with the goals of reducing their failure rate, reducing their readout dead time and improving the overall performance of the array. The entire camera electronics has been renewed from ground-up, as well as the power, ventilation and pneumatics systems, and the control and data acquisition software. Technical solutions forseen for the next-generation Cherenkov Telescope Array (CTA) observatory have been introduced, most notably the readout is based on the NECTAr analog memory chip. The camera control subsystems and the control software framework also pursue an innovative design, increasing the camera performance, robustness and flexibility. The CT1 camera has been upgraded in July 2015 and is currently taking data; CT2-4 will upgraded in Fall 2016. Together they will assure continuous operation of H.E.S.S at its full sensitivity until and possibly beyond the advent of CTA. This contribution describes the design, the testing and the in-lab and on-site performance of all components of the newly upgraded H.E.S.S. camera.
143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...
143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
HMI conventions for process control graphics.
Pikaar, Ruud N
2012-01-01
Process operators supervise and control complex processes. To enable the operator to do an adequate job, instrumentation and process control engineers need to address several related topics, such as console design, information design, navigation, and alarm management. In process control upgrade projects, usually a 1:1 conversion of existing graphics is proposed. This paper suggests another approach, efficiently leading to a reduced number of new powerful process graphics, supported by a permanent process overview displays. In addition a road map for structuring content (process information) and conventions for the presentation of objects, symbols, and so on, has been developed. The impact of the human factors engineering approach on process control upgrade projects is illustrated by several cases.
Determination of Carbonyl Functional Groups in Bio-oils by Potentiometric Titration: The Faix Method
DOE Office of Scientific and Technical Information (OSTI.GOV)
Black, Stuart; Ferrell, Jack R.
We know that carbonyl compounds, present in bio-oils, are responsible for bio-oil property changes upon storage and during upgrading. Specifically, carbonyls cause an increase in viscosity (often referred to as 'aging') during storage of bio-oils. As such, carbonyl content has previously been used as a method of tracking bio-oil aging and condensation reactions with less variability than viscosity measurements. In addition, carbonyls are also responsible for coke formation in bio-oil upgrading processes. Given the importance of carbonyls in bio-oils, accurate analytical methods for their quantification are very important for the bio-oil community. Potentiometric titration methods based on carbonyl oximation havemore » long been used for the determination of carbonyl content in pyrolysis bio-oils. Here, we present a modification of the traditional carbonyl oximation procedures that results in less reaction time, smaller sample size, higher precision, and more accurate carbonyl determinations. And while traditional carbonyl oximation methods occur at room temperature, the Faix method presented here occurs at an elevated temperature of 80 degrees C.« less
Determination of Carbonyl Functional Groups in Bio-oils by Potentiometric Titration: The Faix Method
Black, Stuart; Ferrell, Jack R.
2017-02-07
We know that carbonyl compounds, present in bio-oils, are responsible for bio-oil property changes upon storage and during upgrading. Specifically, carbonyls cause an increase in viscosity (often referred to as 'aging') during storage of bio-oils. As such, carbonyl content has previously been used as a method of tracking bio-oil aging and condensation reactions with less variability than viscosity measurements. In addition, carbonyls are also responsible for coke formation in bio-oil upgrading processes. Given the importance of carbonyls in bio-oils, accurate analytical methods for their quantification are very important for the bio-oil community. Potentiometric titration methods based on carbonyl oximation havemore » long been used for the determination of carbonyl content in pyrolysis bio-oils. Here, we present a modification of the traditional carbonyl oximation procedures that results in less reaction time, smaller sample size, higher precision, and more accurate carbonyl determinations. And while traditional carbonyl oximation methods occur at room temperature, the Faix method presented here occurs at an elevated temperature of 80 degrees C.« less
Wavefront control of large optical systems
NASA Technical Reports Server (NTRS)
Meinel, Aden B.; Meinel, Marjorie P.; Breckinridge, J. B.
1990-01-01
Several levels of wavefront control are necessary for the optimum performance of very large telescopes, especially segmented ones like the Large Deployable Reflector. In general, the major contributors to wavefront error are the segments of the large primary mirror. Wavefront control at the largest optical surface may not be the optimum choice because of the mass and inaccessibility of the elements of this surface that require upgrading. The concept of two-stage optics was developed to permit a poor wavefront from the large optics to be upgraded by means of a wavefront corrector at a small exit pupil of the system.
NASA Technical Reports Server (NTRS)
Vilnrotter, Victor A.
2012-01-01
Initial optical communications experiments with a Vertex polished aluminum panel have been described. The polished panel was mounted on the main reflector of the DSN's research antenna at DSS-13. The PSF was recorded via remotely controlled digital camera mounted on the subreflector structure. Initial PSF generated by Jupiter showed significant tilt error and some mechanical deformation. After upgrades, the PSF improved significantly, leading to much better concentration of light. Communications performance of the initial and upgraded panel structure were compared. After the upgrades, simulated PPM symbol error probability decreased by six orders of magnitude. Work is continuing to demonstrate closed-loop tracking of sources from zenith to horizon, and better characterize communications performance in realistic daytime background environments.
FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L Boring; David I Gertman; Tuan Q Tran
2008-09-01
This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and riskmore » associated with human performance in next generation control rooms.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truitt, R.W.
1997-10-22
This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phasemore » 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system.« less
10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM ...
10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM INTERIOR, SHOWING ESCAPE HATCH. Looking north along east wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
Motor System Upgrades Smooth the Way to Savings of $700,000 at Chevron Refinery
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1999-01-01
By upgrading its motor systems at its Richmond, California refinery, Chevron was able to realize cost savings of more than $700,000 per year, in addition to reduced energy consumption of approximately 1 million kilowatts per month and improved equipment reliability and process control. This fact sheet tells how they did it.
National Ignition Facility Control and Information System Operational Tools
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marshall, C D; Beeler, R G; Bowers, G A
The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint themore » size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.« less
SIG -- The Role of Human-Computer Interaction in Next-Generation Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L. Boring; Jacques Hugo; Christian Richard
2005-04-01
The purpose of this CHI Special Interest Group (SIG) is to facilitate the convergence between human-computer interaction (HCI) and control room design. HCI researchers and practitioners actively need to infuse state-of-the-art interface technology into control rooms to meet usability, safety, and regulatory requirements. This SIG outlines potential HCI contributions to instrumentation and control (I&C) and automation in control rooms as well as to general control room design.
Energy Systems Integration Facility Control Room | Energy Systems
Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees
NASA Astrophysics Data System (ADS)
Grujicic, M.; Galgalikar, R.; Snipes, J. S.; Ramaswami, S.
2016-01-01
In our recent work, a multi-length-scale room-temperature material model for SiC/SiC ceramic-matrix composites (CMCs) was derived and parameterized. The model was subsequently linked with a finite-element solver so that it could be used in a general room-temperature, structural/damage analysis of gas-turbine engine CMC components. Due to its multi-length-scale character, the material model enabled inclusion of the effects of fiber/tow (e.g., the volume fraction, size, and properties of the fibers; fiber-coating material/thickness; decohesion properties of the coating/matrix interfaces; etc.) and ply/lamina (e.g., the 0°/90° cross-ply versus plain-weave architectures, the extent of tow crimping in the case of the plain-weave plies, cohesive properties of the inter-ply boundaries, etc.) length-scale microstructural/architectural parameters on the mechanical response of the CMCs. One of the major limitations of the model is that it applies to the CMCs in their as-fabricated conditions (i.e., the effect of prolonged in-service environmental exposure and the associated material aging-degradation is not accounted for). In the present work, the model is upgraded to include such in-service environmental-exposure effects. To demonstrate the utility of the upgraded material model, it is used within a finite-element structural/failure analysis involving impact of a toboggan-shaped turbine shroud segment by a foreign object. The results obtained clearly revealed the effects that different aspects of the in-service environmental exposure have on the material degradation and the extent of damage suffered by the impacted CMC toboggan-shaped shroud segment.
1997-02-10
KENNEDY SPACE CENTER, FLA. - The White Room is seen at the upper left where the astronauts enter the Space Shuttle for flight. The Rotating Service Structure has been retracted at KSC's Launch Pad 39A. Discovery, the orbiter for the STS-82 mission, is ready for the launch of the second Hubble Space Telescope service mission. The payload consists of the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) that will be installed, Fine Guidance Sensor #1 (FGS-1), and the Space Telescope Imaging Spectrograph (STIS) to be installed. The STS-82 will launch with a crew of seven at 3:54 a.m. EST, Feb. 11, 1997. The launch window is 65 minutes in duration. The Mission Commander for STS-82 is Ken Bowersox. The purpose of the mission is to upgrade the scientific capabilities, service or replace aging components on the Telescope, and provide a reboost to the optimum altitude.
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
Network Upgrade for the SLC: PEP II Network
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crane, M.; Call, M.; Clark, S.
2011-09-09
The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status informationmore » is included.« less
Automatic reactor control system for transient operation
NASA Astrophysics Data System (ADS)
Lipinski, Walter C.; Bhattacharyya, Samit K.; Hanan, Nelson A.
Various programmatic considerations have delayed the upgrading of the TREAT reactor and the performance of the control system is not yet experimentally verified. The current schedule calls for the upgrading activities to occur last in the calendar year 1987. Detailed simulation results, coupled with earlier validation of individual components of the control strategy in TREAT, verify the performance of the algorithms. The control system operates within the safety envelope provided by a protection system designed to ensure reactor safety under conditions of spurious reactivity additions. The approach should be directly applicable to MMW systems, with appropriate accounting of temperature rate limitations of key components and of the inertia of the secondary system components.
Mwencha, Marasi; Rosen, James E; Spisak, Cary; Watson, Noel; Kisoka, Noela; Mberesero, Happiness
2017-09-27
To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced. We used a nonexperimental pre-post study design to compare the previous system with the upgraded management system. We collected baseline data from August to November 2013. We conducted round 1 of post-implementation data collection during April and May 2015, about 1 year after implementation of the upgrades. We evaluated key indicators of data use and reporting; supply chain management practices such as storage and supervision; supply chain performance including stock-out and expiry rates; and supply chain cost and savings. We analyzed the data using a range of techniques including statistical testing of baseline and round-1 results, and cost, cost-effectiveness, and return on investment analysis. The upgrades were associated with improvements in data use, accessibility, visibility, and transparency; planning, control, and monitoring; support for quantification; stock-out rates; stock-out duration; commodity expiry; and forecast error. The upgraded system was more costly, but it was also more efficient, particularly when adjusting for the performance improvements. The upgrades also generated substantial savings that defrayed some, but not all, of the investment costs. Upgrades to Tanzania's supply chain management systems created multiple and complex pathways to impact. One year after implementation, the LMU and eLMIS brought about performance improvements through better data use and through improvements in some, but not all, management practices. Furthermore, the upgrades-while not inexpensive-contributed to greater system efficiency and modest savings. © Mwencha et al.
Hotel guest's $14.5 million jury verdict set aside on appeal.
1999-08-20
A Missouri Court of Appeals judge reversed a $14.5 million judgement against [name removed] Inc., which had been held liable for the beating and sexual assault of a guest in its hotel. The guest, identified as [name removed], had requested an upgrade to a concierge room, to increase her safety, but the hotel did not fill her request. When [name removed] opened her hotel room door the next morning, an assailant attacked, beat and raped her. The assailant escaped hotel security, but was later apprehended. The initial case against [name removed] and the assailant resulted in a $22.5 million judgement for [name removed] Both parties appealed. [Name removed] prevailed in its argument that the initial trial judge misinstructed the jury, and that [name removed] was unable to show clear and convincing evidence that the hotel's willful or conscious disregard for guest safety caused the situation. However, the court ruled against [name removed] on the basis of [name removed]'s fear-of-AIDS claim, because of her exposure to the virus.
3D vision upgrade kit for TALON robot
NASA Astrophysics Data System (ADS)
Edmondson, Richard; Vaden, Justin; Hyatt, Brian; Morris, James; Pezzaniti, J. Larry; Chenault, David B.; Tchon, Joe; Barnidge, Tracy; Kaufman, Seth; Pettijohn, Brad
2010-04-01
In this paper, we report on the development of a 3D vision field upgrade kit for TALON robot consisting of a replacement flat panel stereoscopic display, and multiple stereo camera systems. An assessment of the system's use for robotic driving, manipulation, and surveillance operations was conducted. The 3D vision system was integrated onto a TALON IV Robot and Operator Control Unit (OCU) such that stock components could be electrically disconnected and removed, and upgrade components coupled directly to the mounting and electrical connections. A replacement display, replacement mast camera with zoom, auto-focus, and variable convergence, and a replacement gripper camera with fixed focus and zoom comprise the upgrade kit. The stereo mast camera allows for improved driving and situational awareness as well as scene survey. The stereo gripper camera allows for improved manipulation in typical TALON missions.
The Golden Canopies (Infant Radiant Warmer)
NASA Technical Reports Server (NTRS)
1978-01-01
The cradle warmer is based on technology in heated transparent materials developed by Sierracin Corporation, Sylmar, California he original application was in heated faceplates for the pressure suit heated faceplates worn by pilots of an Air Force/NASA reconnaissance and weather research plane. Later, Sierracin advanced the technology for other applications, among them the cockpit windows of the NASA X-15 supersonic research vehicle and the helmet faceplates of Apollo astronauts. Adapting the technology to hospital needs, Sierracin teamed with Cavitron Corporation, Anaheim, California, which produces the cradle warmer and two other systems employing Sierracin's electrically-heated transparencies. Working to combat the infant mortality rate, hospitals are continually upgrading delivery room and nursery care techniques. Many have special procedures and equipment to protect infants during the "period of apprehension," the critical six to 12 hours after delivery. One such item of equipment is an aerospace spinoff called the Infant Radiant Warmer, a "golden canopy" which provides uniform, controlled warmth to the infant's cradle. Warmth is vitally important to all newborns, particularly premature babies; they lose heat more rapidly than adults because they have greater surface area in comparison with body mass.
NASA Astrophysics Data System (ADS)
Ferraro, R.; Danzeca, S.; Brucoli, M.; Masi, A.; Brugger, M.; Dilillo, L.
2017-04-01
The need for upgrading the Total Ionizing Dose (TID) measurement resolution of the current version of the Radiation Monitoring system for the LHC complex has driven the research of new TID sensors. The sensors being developed nowadays can be defined as Systems On Chip (SOC) with both analog and digital circuitries embedded in the same silicon. A radiation tolerant TID Monitoring System (TIDMon) has been designed to allow the placement of the entire dosimeter readout electronics in very harsh environments such as calibration rooms and even in the mixed radiation field such as the one of the LHC complex. The objective of the TIDMon is to measure the effect of the TID on the new prototype of Floating Gate Dosimeter (FGDOS) without using long cables and with a reliable measurement system. This work introduces the architecture of the TIDMon, the radiation tolerance techniques applied on the controlling electronics as well as the design choices adopted for the system. Finally, results of several tests of TIDMon under different radiation environments such as gamma rays or mixed radiation field at CHARM are presented.
Network Upgrade for the SLC: Control System Modifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crane, M.; Mackenzie, R.; Sass, R.
2011-09-09
Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.
The Network Operations Control Center upgrade task: Lessons learned
NASA Technical Reports Server (NTRS)
Sherif, J. S.; Tran, T.-L.; Lee, S.
1994-01-01
This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bushmelev, Vadim; Viktorov, Vladimir; Zhikharev, Stanislav
2008-01-01
The All-Russian Scientific Research Institute of Experimental Physics (VNIIEF), founded in 1946 at the historic village of Sarov, in Nizhniy Novgorod Oblast, is the largest nuclear research center in the Rosatom complex. In the framework of international collaboration, the United States (US) Department of Energy/National Nuclear Security Agency, in cooperation with US national laboratories, on the one hand, Rosatom and VNIIEF on the other hand, have focused their cooperative efforts to upgrade the existing material protection control and accountability system to prevent unauthorized access to the nuclear material. In this paper we will discuss the present status of material controlmore » and accounting (MC&A) system upgrades and the preliminary results from a pilot program on the MC&A system performance testing that was recently conducted at one technical area.« less
An overview of autonomous rendezvous and docking system technology development
NASA Astrophysics Data System (ADS)
Nelson, Kurt D.
The Centaur upper stage was selected for an airborne avionics modernization program. The parts used in the existing avionics units were obsolete. Continued use of existing hardware would require substantial redesign, yet would result in the use of outdated hardware. Out of date processes, with very expensive and labor intensive technologies, were being used for manufacturing. The Atlas/Centaur avionics were to be procured at a fairly high rate that demanded the use of modern components. The new avionics also reduce size, weight, power, and parts count with a dramatic improvement in reliability. Finally, the cost leverage derived from upgrading the avionics as opposed to any other subsystem for the existing Atlas/Centaur was a very large consideration in the upgrade decision. The upgrade program is a multiyear effort that began in 1989. It includes telemetry, guidance and navigation, control electronics, thrust vector control, and redundancy levels.
75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...
Upgrading the Control Systems of Turbines of K-160-12.8 Type Produced by PAO Turboatom
NASA Astrophysics Data System (ADS)
Babayev, I. N.
2018-05-01
Steam turbines of a K-160-12.8 (PVK-150) type produced by PAO Turboatom are operated at thermal power plants from the 1960s and many of them still have the complete set that was installed at that time by the factory, but they have become out of date. For this reason, the problem of upgrading the turbines to bring their characteristics into compliance with modern requirements is relevant. This article describes the main technical decisions adopted by PAO Turboatom when upgrading the automatic control system (ACS) of a K-160-12.8 (PVK-150) turbine: replacing the control valves (CV); replacing the distributing mechanism; replacing the front support components, including the main servomotor and oil control pipes; and replacing the assembly of cutoff spools by separate spools of servomotors of high-pressure control valves and reheat control valves. The schematic diagram of the ACS and description of the structure of newly installed mechanisms are presented: the cutoff spools, the high-pressure CVs, the distribution mechanism, and the main servomotor. The particularity of the ACS is the presence of electromechanical converters, which are used in each cutoff spool. For improving operating reliability of the ACS by providing the actuation of servomotors of control valves for closing regardless of ACS commands, the connection of rods of the electromechanical converter and cutoff spools are made using spring-type uncoupling devices. For actuation of the protection system by the commands of the automatic electronic safety device, the separate actuator driven by an electromagnet is installed in the ACS. During further improvement of the protection system, it is recommended to replace the controller assembly by two-spool protection devices, remove the protection spool assembly, and increase the pressure in the protection lines up to power pressure. The upgrading during this project was carried out by the Dobrotvor TPP (Ukraine).
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
AN/ASQ-197 provides commonality to Recce systems and avionics upgrades
NASA Astrophysics Data System (ADS)
Regan, Brendan P.
1993-02-01
In an attempt to strike a balance between increases in multi-role tactical air reconnaissance mission tasking and simultaneous decreases in defense spending, many users are evaluating upgrades to existing sensors and reconnaissance systems. At the heart of any cost-effective reconnaissance system upgrade must be a flexible reconnaissance management system, capable of filling multiple rolls in today's film backed reconnaissance system, while enabling successful transition to the Electro-Optical (EO) system of tomorrow. As a case in point this paper describes enhanced effectiveness and growth potential that Fairchild's AN/ASQ-197 Sensor Control-Data Display Set (SC-DDS) can provide.
Design of an integrated master-slave robotic system for minimally invasive surgery.
Li, Jianmin; Zhou, Ningxin; Wang, Shuxin; Gao, Yuanqian; Liu, Dongchun
2012-03-01
Minimally invasive surgery (MIS) robots are commonly used in hospitals and medical centres. However, currently available robotic systems are very complicated and huge, greatly raising system costs and the requirements of operating rooms. These disadvantages have become the major impediments to the expansion of MIS robots. An integrated MIS robotic system is proposed based on the analysis of advantages and disadvantages of different MIS robots. In the proposed system, the master manipulators, slave manipulators, image display device and control system have been designed as a whole. Modular design is adopted for the control system for easy maintenance and upgrade. The kinematic relations between the master and the slave are also investigated and embedded in software to realize intuitive movements of hand and instrument. Finally, animal experiments were designed to test the effectiveness of the robot. The robot realizes natural hand-eye movements between the master and the slave to facilitate MIS operations. The experimental results show that the robot can realize similar functions to those of current commercialized robots. The integrated design simplifies the robotic system and facilitates use of the robot. Compared with the commercialized robots, the proposed MIS robot achieves similar functions and features but with a smaller size and less weight. Copyright © 2011 John Wiley & Sons, Ltd.
US-CERT Control System Center Input/Output (I/O) Conceputal Design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2005-02-01
This document was prepared for the US-CERT Control Systems Center of the National Cyber Security Division (NCSD) of the Department of Homeland Security (DHS). DHS has been tasked under the Homeland Security Act of 2002 to coordinate the overall national effort to enhance the protection of the national critical infrastructure. Homeland Security Presidential Directive HSPD-7 directs the federal departments to identify and prioritize critical infrastructure and protect it from terrorist attack. The US-CERT National Strategy for Control Systems Security was prepared by the NCSD to address the control system security component addressed in the National Strategy to Secure Cyberspace andmore » the National Strategy for the Physical Protection of Critical Infrastructures and Key Assets. The US-CERT National Strategy for Control Systems Security identified five high-level strategic goals for improving cyber security of control systems; the I/O upgrade described in this document supports these goals. The vulnerability assessment Test Bed, located in the Information Operations Research Center (IORC) facility at Idaho National Laboratory (INL), consists of a cyber test facility integrated with multiple test beds that simulate the nation's critical infrastructure. The fundamental mission of the Test Bed is to provide industry owner/operators, system vendors, and multi-agency partners of the INL National Security Division a platform for vulnerability assessments of control systems. The Input/Output (I/O) upgrade to the Test Bed (see Work Package 3.1 of the FY-05 Annual Work Plan) will provide for the expansion of assessment capabilities within the IORC facility. It will also provide capabilities to connect test beds within the Test Range and other Laboratory resources. This will allow real time I/O data input and communication channels for full replications of control systems (Process Control Systems [PCS], Supervisory Control and Data Acquisition Systems [SCADA], and components). This will be accomplished through the design and implementation of a modular infrastructure of control system, communications, networking, computing and associated equipment, and measurement/control devices. The architecture upgrade will provide a flexible patching system providing a quick ''plug and play''configuration through various communication paths to gain access to live I/O running over specific protocols. This will allow for in-depth assessments of control systems in a true-to-life environment. The full I/O upgrade will be completed through a two-phased approach. Phase I, funded by DHS, expands the capabilities of the Test Bed by developing an operational control system in two functional areas, the Science & Technology Applications Research (STAR) Facility and the expansion of various portions of the Test Bed. Phase II (see Appendix A), funded by other programs, will complete the full I/O upgrade to the facility.« less
Chang, Beverly; Kaye, Alan D; Diaz, James H; Westlake, Benjamin; Dutton, Richard P; Urman, Richard D
2015-04-07
This study examines the impact of procedural locations and types of anesthetics on patient outcomes in non-operating room anesthesia (NORA) locations. The National Anesthesia Clinical Outcomes Registry database was examined to compare OR to NORA anesthetic complications and patient demographics. The National Anesthesia Clinical Outcomes Registry database was examined for all patient procedures from 2010 to 2013. A total of 12,252,846 cases were analyzed, with 205 practices contributing information, representing 1494 facilities and 7767 physician providers. Cases were separated on the basis of procedure location, OR, or NORA. Subgroup analysis examined outcomes from specific subspecialties. Non-OR anesthesia procedures were performed on a higher percentage of patients older than 50 years (61.92% versus 55.56%, P < 0.0001). Monitored anesthesia care (MAC) (20.15%) and sedation (2.05%) were more common in NORA locations. The most common minor complications were postoperative nausea and vomiting (1.06%), inadequate pain control (1.01%), and hemodynamic instability (0.62%). The most common major complications were serious hemodynamic instability (0.10%) and upgrade of care (0.10%). There was a greater incidence of complications in cardiology and radiology locations. Overall mortality was higher in OR versus NORA (0.04% versus 0.02%, P < 0.0001). Subcategory analysis showed increased incidence of death in cardiology and radiology locations (0.05%). Non-OR anesthesia procedures have lower morbidity and mortality rates than OR procedures, contrary to some previously published studies. However, the increased complication rates in both the cardiology and radiology locations may need to be the target of future safety investigations. Providers must ensure proper monitoring of patients, and NORA locations need to be held to the same standard of care as the main operating room. Further studies need to identify at-risk patients and procedures that may predispose patients to complications.
Chang, Beverly; Kaye, Alan D; Diaz, James H; Westlake, Benjamin; Dutton, Richard P; Urman, Richard D
2018-03-01
This study examines the impact of procedural locations and types of anesthetics on patient outcomes in non-operating room anesthesia (NORA) locations. The National Anesthesia Clinical Outcomes Registry database was examined to compare OR to NORA anesthetic complications and patient demographics. The National Anesthesia Clinical Outcomes Registry database was examined for all patient procedures from 2010 to 2013. A total of 12,252,846 cases were analyzed, with 205 practices contributing information, representing 1494 facilities and 7767 physician providers. Cases were separated on the basis of procedure location, OR, or NORA. Subgroup analysis examined outcomes from specific subspecialties. NORA procedures were performed on a higher percentage of patients older than 50 years (61.92% versus 55.56%, P < 0.0001). Monitored anesthesia care (MAC) (20.15%) and sedation (2.05%) were more common in NORA locations. The most common minor complications were postoperative nausea and vomiting (1.06%), inadequate pain control (1.01%), and hemodynamic instability (0.62%). The most common major complications were serious hemodynamic instability (0.10%) and upgrade of care (0.10%). There was a greater incidence of complications in cardiology and radiology locations. Overall mortality was higher in OR versus NORA (0.04% versus 0.02%, P < 0.0001). Subcategory analysis showed increased incidence of death in cardiology and radiology locations (0.05%). NORA procedures have lower morbidity and mortality rates than OR procedures, contrary to some previously published studies. However, the increased complication rates in both the cardiology and radiology locations may need to be the target of future safety investigations. Providers must ensure proper monitoring of patients, and NORA locations need to be held to the same standard of care as the main operating room. Further studies need to identify at-risk patients and procedures that may predispose patients to complications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koivisto, H., E-mail: hannu.koivisto@phys.jyu.fi; Kalvas, T.; Tarvainen, O.
Several ion source related research and development projects are in progress at the Department of Physics, University of Jyväskylä (JYFL). The work can be divided into investigation of the ion source plasma and development of ion sources, ion beams, and diagnostics. The investigation covers the Electron Cyclotron Resonance Ion Source (ECRIS) plasma instabilities, vacuum ultraviolet (VUV) and visible light emission, photon induced electron emission, and the development of plasma diagnostics. The ion source development covers the work performed for radiofrequency-driven negative ion source, RADIS, beam line upgrade of the JYFL 14 GHz ECRIS, and the development of a new room-temperature-magnetmore » 18 GHz ECRIS, HIISI.« less
Yan, Jun-Min; Li, Si-Jia; Yi, Sha-Sha; Wulan, Ba-Ri; Zheng, Wei-Tao; Jiang, Qing
2018-03-01
Hydrogen is widely considered to be a sustainable and clean energy alternative to the use of fossil fuels in the future. Its high hydrogen content, nontoxicity, and liquid state at room temperature make formic acid a promising hydrogen carrier. Designing highly efficient and low-cost heterogeneous catalysts is a major challenge for realizing the practical application of formic acid in the fuel-cell-based hydrogen economy. Herein, a simple but effective and rapid strategy is proposed, which demonstrates the synthesis of NiPd bimetallic ultrafine particles (UPs) supported on NH 2 -functionalized and N-doped reduced graphene oxide (NH 2 -N-rGO) at room temperature. The introduction of the NH 2 N group to rGO is the key reason for the formation of the ultrafine and well-dispersed Ni 0.4 Pd 0.6 UPs (1.8 nm) with relatively large surface area and more active sites. Surprisingly, the as-prepared low-cost NiPd/NH 2 -N-rGO dsiplays excellent hydrophilicity, 100% H 2 selectivity, 100% conversion, and remarkable catalytic activity (up to 954.3 mol H 2 (mol catalyst) -1 h -1 ) for FA decomposition at room temperature even with no additive, which is much higher than that of the best catalysts so far reported. © 2018 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
75 FR 69912 - Pipeline Safety: Control Room Management/Human Factors
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... 192 and 195 [Docket ID PHMSA-2007-27954] RIN 2137-AE64 Pipeline Safety: Control Room Management/Human... rulemaking; Extension of comment period. SUMMARY: On September 17, 2010, PHMSA published a Control Room... Control Room Management/Human Factors rule at 49 CFR 192.631 and 195.446. The NPRM proposes to expedite...
A scalable and continuous-upgradable optical wireless and wired convergent access network.
Sung, J Y; Cheng, K T; Chow, C W; Yeh, C H; Pan, C-L
2014-06-02
In this work, a scalable and continuous upgradable convergent optical access network is proposed. By using a multi-wavelength coherent comb source and a programmable waveshaper at the central office (CO), optical millimeter-wave (mm-wave) signals of different frequencies (from baseband to > 100 GHz) can be generated. Hence, it provides a scalable and continuous upgradable solution for end-user who needs 60 GHz wireless services now and > 100 GHz wireless services in the future. During the upgrade, user only needs to upgrade their optical networking unit (ONU). A programmable waveshaper is used to select the suitable optical tones with wavelength separation equals to the desired mm-wave frequency; while the CO remains intact. The centralized characteristics of the proposed system can easily add any new service and end-user. The centralized control of the wavelength makes the system more stable. Wired data rate of 17.45 Gb/s and w-band wireless data rate up to 3.36 Gb/s were demonstrated after transmission over 40 km of single-mode fiber (SMF).
Operational present status and reliability analysis of the upgraded EAST cryogenic system
NASA Astrophysics Data System (ADS)
Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.
2017-12-01
Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.
Searching for New Physics with Top Quarks and Upgrade to the Muon Spectrometer at ATLAS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwarz, Thomas Andrew
2015-06-29
Over the funding period of this award, my research has focused on searching for new physics with top quarks and in the Higgs sector. The highly energetic top quark events at the LHC are an excellent venue to search for new physics, as well as make standard model measurements. Further, the recent discovery of the Higgs boson motivates searching for new physics that could be associated with it. This one-year award has facilitated the beginning of my research program, which has resulted in four publications, several conference talks, and multiple leadership positions within physics groups. Additionally, we are contributing tomore » ATLAS upgrades and operations. As part of the Phase I upgrade, I have taken on the responsibility of the design, prototyping, and quality control of a signal packet router for the trigger electronics of the New Small Wheel. This is a critical component of the upgrade, as the router is the main switchboard for all trigger signals to track finding processors. I am also leading the Phase II upgrade of the readout electronics of the muon spectrometer, and have been selected as the USATLAS Level-2 manager of the Phase II upgrade of the muon spectrometer. The award has been critical in these contributions to the experiment.« less
NE-CAT Upgrade of the Bending Magnet Beamline 8BM at the ALS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang Jun; Ogata, Craig; Yang Xiaochun
2007-01-19
NE-CAT, North East Collaborative Access Team, bending magnet beamline (8BM) is a beamline for protein crystallography. Recently, the beamline has undergone upgrades of its x-ray optics, control system, and the addition of a robot automounter. The first crystal of the double crystal monochromator was replaced by a new design offered by Oxford Danfysik with a micro-finned, direct water-cooled crystal assembly that would provide better cooling and reduced thermal distortion, pressure induced bulge, and residual strain. Gear reduced motors were added to enhance the torque of the bender and obtain better control. For measuring displacement of the bender directly, two linearmore » variable differential transformers (LVDT) were installed to the second crystal assembly. Early optics characterization and analysis has been carried out. Besides the upgrade of the optical components, the Blu-Ice control system originally developed at SSRL has been implemented. The installation of an automated robotic sample mounting system, from the ALS, was carried out in collaboration with the engineering group at LBNL. Preliminary results are presented.« less
The enhanced ASDEX Upgrade pellet centrifuge launcher
NASA Astrophysics Data System (ADS)
Plöckl, B.; Lang, P. T.
2013-10-01
Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.
The enhanced ASDEX Upgrade pellet centrifuge launcher.
Plöckl, B; Lang, P T
2013-10-01
Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.
The enhanced ASDEX Upgrade pellet centrifuge launcher
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plöckl, B.; Lang, P. T.
2013-10-15
Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system.more » Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.« less
NASA Astrophysics Data System (ADS)
Dumont Dayot, Nicolas
2012-01-01
In the context of the LHC upgrade, we develop a new Read Out Driver (ROD) for the ATLAS Liquid Argon (LAr) community. ATCA and μTCA (Advanced/Micro Telecom Computing Architecture) is becoming a standard in high energy physics and a strong candidate to be used for boards and crates. We work to master ATCA and to integrate a large number of high speed links (96 links at 8.5 Gbps) on a ROD evaluation ATCA board. A versatile ATCA IPMI controller for ATCA boards which is FPGA Mezzanine Card (FMC) compliant has been developed to control the ROD evaluation board.
Mwencha, Marasi; Rosen, James E; Spisak, Cary; Watson, Noel; Kisoka, Noela; Mberesero, Happiness
2017-01-01
ABSTRACT Background: To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced. Methods: We used a nonexperimental pre-post study design to compare the previous system with the upgraded management system. We collected baseline data from August to November 2013. We conducted round 1 of post-implementation data collection during April and May 2015, about 1 year after implementation of the upgrades. We evaluated key indicators of data use and reporting; supply chain management practices such as storage and supervision; supply chain performance including stock-out and expiry rates; and supply chain cost and savings. We analyzed the data using a range of techniques including statistical testing of baseline and round-1 results, and cost, cost-effectiveness, and return on investment analysis. Results: The upgrades were associated with improvements in data use, accessibility, visibility, and transparency; planning, control, and monitoring; support for quantification; stock-out rates; stock-out duration; commodity expiry; and forecast error. The upgraded system was more costly, but it was also more efficient, particularly when adjusting for the performance improvements. The upgrades also generated substantial savings that defrayed some, but not all, of the investment costs. Conclusion: Upgrades to Tanzania's supply chain management systems created multiple and complex pathways to impact. One year after implementation, the LMU and eLMIS brought about performance improvements through better data use and through improvements in some, but not all, management practices. Furthermore, the upgrades—while not inexpensive—contributed to greater system efficiency and modest savings. PMID:28877933
The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training
NASA Technical Reports Server (NTRS)
Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)
2002-01-01
NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.
8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
PBF Control Building (PER619). Interior of control room shows control ...
PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Status of the University of Rochester tandem upgrade
NASA Astrophysics Data System (ADS)
Cross, Clinton; Miller, Thomas
1986-05-01
The status of the University of Rochester tandem Van de Graaff accelerator upgrade is reviewed. The accelerator upgrade to 18 MV consists of extended tubes, shielded resistors, dead-section ion pumping, two rotating insulating power shaft systems to provide power to the dead sections and terminal, and a pelletron charging system to replace the charging belt. Control of many of the accelerator operating systems will be done by two IBM personal computers. The negative ion injector diffusion pump, isolation transformer, preacceleration high-voltage power supply, and high-voltage corona enclosure will all be replaced. Finally, the SF6 gas handling system will be improved with the addition of a second set of gas dryers and a larger recirculating pump.
NASA Astrophysics Data System (ADS)
Wedeking, Gregory A.; Zierer, Joseph J.; Jackson, John R.
2010-07-01
The University of Texas, Center for Electromechanics (UT-CEM) is making a major upgrade to the robotic tracking system on the Hobby Eberly Telescope (HET) as part of theWide Field Upgrade (WFU). The upgrade focuses on a seven-fold increase in payload and necessitated a complete redesign of all tracker supporting structure and motion control systems, including the tracker bridge, ten drive systems, carriage frames, a hexapod, and many other subsystems. The cost and sensitivity of the scientific payload, coupled with the tracker system mass increase, necessitated major upgrades to personnel and hardware safety systems. To optimize kinematic design of the entire tracker, UT-CEM developed novel uses of constraints and drivers to interface with a commercially available CAD package (SolidWorks). For example, to optimize volume usage and minimize obscuration, the CAD software was exercised to accurately determine tracker/hexapod operational space needed to meet science requirements. To verify hexapod controller models, actuator travel requirements were graphically measured and compared to well defined equations of motion for Stewart platforms. To ensure critical hardware safety during various failure modes, UT-CEM engineers developed Visual Basic drivers to interface with the CAD software and quickly tabulate distance measurements between critical pieces of optical hardware and adjacent components for thousands of possible hexapod configurations. These advances and techniques, applicable to any challenging robotic system design, are documented and describe new ways to use commercially available software tools to more clearly define hardware requirements and help insure safe operation.
6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
NASA Technical Reports Server (NTRS)
Brunat, H
1927-01-01
This report presents methods to reduce the incidence of aviation accidents. Some of the methods discussed include enlistment and training of aviators, improvement of controls and control surfaces, and upgrading of power plants.
NASA Technical Reports Server (NTRS)
Kennedy, Barbara J.
2004-01-01
The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.
The upgrade of the H.E.S.S. cameras
NASA Astrophysics Data System (ADS)
Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; Naurois, Mathieu de; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois
2017-12-01
The High Energy Stereoscopic System (HESS) is an array of imaging atmospheric Cherenkov telescopes (IACTs) located in the Khomas highland in Namibia. It was built to detect Very High Energy (VHE > 100 GeV) cosmic gamma rays. Since 2003, HESS has discovered the majority of the known astrophysical VHE gamma-ray sources, opening a new observational window on the extreme non-thermal processes at work in our universe. HESS consists of four 12-m diameter Cherenkov telescopes (CT1-4), which started data taking in 2002, and a larger 28-m telescope (CT5), built in 2012, which lowers the energy threshold of the array to 30 GeV . The cameras of CT1-4 are currently undergoing an extensive upgrade, with the goals of reducing their failure rate, reducing their readout dead time and improving the overall performance of the array. The entire camera electronics has been renewed from ground-up, as well as the power, ventilation and pneumatics systems, and the control and data acquisition software. Only the PMTs and their HV supplies have been kept from the original cameras. Novel technical solutions have been introduced, which will find their way into some of the Cherenkov cameras foreseen for the next-generation Cherenkov Telescope Array (CTA) observatory. In particular, the camera readout system is the first large-scale system based on the analog memory chip NECTAr, which was designed for CTA cameras. The camera control subsystems and the control software framework also pursue an innovative design, exploiting cutting-edge hardware and software solutions which excel in performance, robustness and flexibility. The CT1 camera has been upgraded in July 2015 and is currently taking data; CT2-4 have been upgraded in fall 2016. Together they will assure continuous operation of HESS at its full sensitivity until and possibly beyond the advent of CTA. This contribution describes the design, the testing and the in-lab and on-site performance of all components of the newly upgraded HESS camera.
Fuel Flexible Gas Turbine Combustor Flametube Facility Upgraded
NASA Technical Reports Server (NTRS)
Little, James E.; Nemets, Steve A.; Tornabene, Robert T.; Smith, Timothy D.; Frankenfeld, Bruce J.
2004-01-01
In fiscal year 2003, test cell 23 of the Research Combustion Laboratory (RCL 23) at the NASA Glenn Research Center was upgraded with the addition of gaseous hydrogen as a working propellant and the addition of a 450-psig air-supply system. Test flexibility was further enhanced by upgrades to the facility control systems. RCL 23 can now test with gaseous hydrogen flow rates up to 0.05 lbm/sec and jet fuel flow rates up to 0.62 lbm/sec. Research airflow rates up to 3 lbm/sec are possible with the 450-psig supply system over a range of inlet temperatures. Nonvitiated, heated air is supplied from a shell and tube heat exchanger. The maximum nonvitiated facility air temperature is 1100 F at 1.5 lbm/sec. Research-section exhaust temperatures are limited to 3200 F because of material and cooling capacity limits. A variety of support systems are available depending on the research hardware configuration. Test section ignition can be provided via either a hydrogen air torch system or an electronic spark system. Emissions measurements are obtained with either pneumatically or electromechanically actuated gas sample probes, and the electromechanical system allows for radial measurements at a user-specified axial location for measurement of emissions profiles. Gas analysis data can be obtained for a variety of species, including carbon monoxide (CO), carbon dioxide (CO2), nitrogen oxides (NO and NOx), oxygen (O2), unburnt hydrocarbons, and unburnt hydrogen. Facility control is accomplished with a programmable logic control system. Facility operations have been upgraded to a system based on graphical user interface control screens. A data system is available for real-time acquisition and monitoring of both measurements in engineering units and performance calculations. The upgrades have made RCL 23 a highly flexible facility for research into low emissions gas turbine combustor concepts, and the flame tube configuration inherently allows for a variety of fuel nozzle configurations to be tested in a cost-effective manner. RCL 23 is poised to be a leading facility for developing modern low-emission fuel nozzles for use with jet fuel and alternative fuels.
The Integration of DCS I/O to an Existing PLC
NASA Technical Reports Server (NTRS)
Sadhukhan, Debashis; Mihevic, John
2013-01-01
At the NASA Glenn Research Center (GRC), Existing Programmable Logic Controller (PLC) I/O was replaced with Distributed Control System (DCS) I/O, while keeping the existing PLC sequence Logic. The reason for integration of the PLC logic and DCS I/O, along with the evaluation of the resulting system is the subject of this paper. The pros and cons of the old system and new upgrade are described, including operator workstation screen update times. Detail of the physical layout and the communication between the PLC, the DCS I/O and the operator workstations are illustrated. The complex characteristics of a central process control system and the plan to remove the PLC processors in future upgrades is also discussed.
Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Josh A. Salmond
2009-08-07
The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and lowmore » residual stresses. The products fabricated are used on multiple programs.« less
PBF Control Building (PER619). Interior of control room. Control console ...
PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Study About Ceiling Design for Main Control Room of NPP with HFE
NASA Astrophysics Data System (ADS)
Gu, Pengfei; Ni, Ying; Chen, Weihua; Chen, Bo; Zhang, Jianbo; Liang, Huihui
Recently since human factor engineering (HFE) has been used in control room design of nuclear power plant (NPP), the human-machine interface (HMI) has been gradual to develop harmoniously, especially the use of the digital technology. Comparing with the analog technology which was used to human-machine interface in the past, human-machine interaction has been more enhanced. HFE and the main control room (MCR) design engineering of NPP is a combination of multidisciplinary cross, mainly related to electrical and instrument control, reactor, machinery, systems engineering and management disciplines. However, MCR is not only equipped with HMI provided by the equipments, but also more important for the operator to provide a work environment, such as the main control room ceiling. The ceiling design of main control room related to HFE which influences the performance of staff should also be considered in the design of the environment and aesthetic factors, especially the introduction of professional design experience and evaluation method. Based on Ling Ao phase II and Hong Yanhe project implementation experience, the study analyzes lighting effect, space partition, vision load about the ceiling of main control room of NPP. Combining with the requirements of standards, the advantages and disadvantages of the main control room ceiling design has been discussed, and considering the requirements of lightweight, noise reduction, fire prevention, moisture protection, the ceiling design solution of the main control room also has been discussed.
A project of upgrading the operations control system of the Hungarian electric power system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oroszki, L.; Kovacs, G.
About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communicationmore » protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.« less
The INFN-FBK pixel R&D program for HL-LHC
NASA Astrophysics Data System (ADS)
Meschini, M.; Dalla Betta, G. F.; Boscardin, M.; Calderini, G.; Darbo, G.; Giacomini, G.; Messineo, A.; Ronchin, S.
2016-09-01
We report on the ATLAS and CMS joint research activity, which is aiming at the development of new, thin silicon pixel detectors for the Large Hadron Collider Phase-2 detector upgrades. This R&D is performed under special agreement between Istituto Nazionale di Fisica Nucleare and FBK foundation (Trento, Italy). New generations of 3D and planar pixel sensors with active edges are being developed in the R&D project, and will be fabricated at FBK. A first planar pixel batch, which was produced by the end of year 2014, will be described in this paper. First clean room measurement results on planar sensors obtained before and after neutron irradiation will be presented.
X-ray optics simulation and beamline design for the APS upgrade
NASA Astrophysics Data System (ADS)
Shi, Xianbo; Reininger, Ruben; Harder, Ross; Haeffner, Dean
2017-08-01
The upgrade of the Advanced Photon Source (APS) to a Multi-Bend Achromat (MBA) will increase the brightness of the APS by between two and three orders of magnitude. The APS upgrade (APS-U) project includes a list of feature beamlines that will take full advantage of the new machine. Many of the existing beamlines will be also upgraded to profit from this significant machine enhancement. Optics simulations are essential in the design and optimization of these new and existing beamlines. In this contribution, the simulation tools used and developed at APS, ranging from analytical to numerical methods, are summarized. Three general optical layouts are compared in terms of their coherence control and focusing capabilities. The concept of zoom optics, where two sets of focusing elements (e.g., CRLs and KB mirrors) are used to provide variable beam sizes at a fixed focal plane, is optimized analytically. The effects of figure errors on the vertical spot size and on the local coherence along the vertical direction of the optimized design are investigated.
Riser, E.; Noone, P.; Thompson, R. E.
1978-01-01
The fluorescent antibody technique was used to investigate an epidemic of Klebsiella infection in a urological ward and to trace the probable source to a contaminated sink in the treatment room. It was also shown that cross infections by particular capsular types were very common within each ward. Certain types of Klebsiella occurred in cut flower water but could not be associated with the types infecting the patients. Antibiotic resistance patterns within one capsular type were found to vary whether the type was from different sources in one patient or from different patients in the same ward. One capsular type was observed to develop resistance to increasing numbers of antibiotics over a 3-year period. This was probably due to the acquisition of R-plasmids. There also appeared to be a relation between capsular type and the site of infection. The frequency of Klebsiella infections in the urological wards dropped significantly after up-grading the treatment room, improving catheter storage and reducing ampicillin use. PMID:340582
2012-11-16
CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis
2012-11-16
CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis
Plasma production and preliminary results from the ADITYA Upgrade tokamak
NASA Astrophysics Data System (ADS)
R, L. TANNA; J, GHOSH; Harshita, RAJ; Rohit, KUMAR; Suman, AICH; Vaibhav, RANJAN; K, A. JADEJA; K, M. PATEL; S, B. BHATT; K, SATHYANARAYANA; P, K. CHATTOPADHYAY; M, N. MAKWANA; K, S. SHAH; C, N. GUPTA; V, K. PANCHAL; Praveenlal, EDAPPALA; Bharat, ARAMBHADIYA; Minsha, SHAH; Vismay, RAULJI; M, B. CHOWDHURI; S, BANERJEE; R, MANCHANDA; D, RAJU; P, K. ATREY; Umesh, NAGORA; J, RAVAL; Y, S. JOISA; K, TAHILIANI; S, K. JHA; M, V. GOPALKRISHANA
2018-07-01
The Ohmically heated circular limiter tokamak ADITYA (R 0 = 75 cm, a = 25 cm) has been upgraded to a tokamak named the ADITYA Upgrade (ADITYA-U) with an open divertor configuration with divertor plates. The main goal of ADITYA-U is to carry out dedicated experiments relevant for bigger fusion machines including ITER, such as the generation and control of runaway electrons, disruption prediction, and mitigation studies, along with an improvement in confinement with shaped plasma. The ADITYA tokamak was dismantled and the assembly of ADITYA-U was completed in March 2016. Integration of subsystems like data acquisition and remote operation along with plasma production and preliminary plasma characterization of ADITYA-U plasmas are presented in this paper.
Tevatron beam position monitor upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolbers, Stephen; Banerjee, B.; Barker, B.
2005-05-01
The Tevatron Beam Position Monitor (BPM) readout electronics and software have been upgraded to improve measurement precision, functionality and reliability. The original system, designed and built in the early 1980's, became inadequate for current and future operations of the Tevatron. The upgraded system consists of 960 channels of new electronics to process analog signals from 240 BPMs, new front-end software, new online and controls software, and modified applications to take advantage of the improved measurements and support the new functionality. The new system reads signals from both ends of the existing directional stripline pickups to provide simultaneous proton and antiprotonmore » position measurements. Measurements using the new system are presented that demonstrate its improved resolution and overall performance.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
D.A. Gates; J.R. Ferron; M. Bell
In 2003, the NSTX plasma control system was used for plasma shape control using real-time equilibrium reconstruction (using the rtEFIT code - J. Ferron, et al., Nucl. Fusion 38 1055 (1998)). rtEFIT is now in routine use for plasma boundary control [D. A. Gates, et al., submitted to Nuclear Fusion (2005)]. More recently, the system has been upgraded to support feedback control of the resistive wall mode (RWM). This paper describes the hardware and software improvements that were made in support of these physics requirements. The real-time data acquisition system now acquires 352 channels of data at 5kHz for eachmore » NSTX plasma discharge. The latency for the data acquisition, which uses the FPDP (Front Panel Data Port) protocol, is measured to be {approx}8 microseconds. A Stand-Alone digitizer (SAD), designed at PPPL, along with an FPDP Input multiplexing module (FIMM) allows for simple modular upgrades. An interface module was built to interface between the FPDP output of the NSTX control system and the legacy Power Conversion link (PCLINK) used for communicating with the PPPL power supplies (first used for TFTR). Additionally a module has been built for communicating with the switching power amplifiers (SPA) recently installed on NSTX. In addition to the hardware developments, the control software [D. Mastrovito, Fusion Eng. And Design 71 65 (2004)] on the NSTX control system has been upgraded. The control computer is an eight processor (8x333MHz G4) built by Sky Computers (Helmsford, MA). The device driver software for the hardware described above will be discussed, as well as the new control algorithms that have been developed to control the switching power supplies for RWM control. An important initial task in RWM feedback is to develop a reliable mode detection algorithm.« less
Dedication of emergency diesel generators` control air subsystem
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, M.; Myers, G.; Palumbo, M.
1994-12-31
In the spring of 1993, the need to upgrade Seabrook Station`s emergency diesel generators` (EDGs`) control air system from nonsafety related to safety related was identified. This need was identified as a result of questions raised by the US Nuclear Regulatory Commission, which was conducting an Electrical Distribution Safety Functional Inspection at Seabrook at that time. The specific reason for the reassignment of safety classification was recognition that failure of the control air supply to the EDGs` jacket cooling water temperature control valves could cause overcooling of the EDGs, which potentially could result in EDG failure during long-term operation. Thismore » paper addresses how the installed control air system was upgraded to safety related using Seabrook`s Commercial Grade Dedication (CGD) Program and how, by using the dedication skills obtained over the past few years, it was done at minimal cost.« less
Lee, Wen-Sen; Hsieh, Tai-Chin; Shiau, Justine C; Ou, Tsong-Yih; Chen, Fu-Lun; Liu, Yu-Hsin; Yen, Muh-Yong; Hsueh, Po-Ren
2017-10-01
This prospective before-after study was intended to investigate the effect of Bio-Kil on reducing environmental bacterial burden and healthcare-associated infections (HAIs) in intensive care units (ICUs) at the Municipal Wan-Fang Hospital, Taipei, Taiwan in 2014. Four rooms in the medical and surgical ICUs were investigated and designated as study rooms (n = 2) or control rooms (n = 2). Routine disinfection was performed during the pre-intervention period in both room types. Bio-Kil was applied to the fomites and surroundings of the study rooms during the intervention period. Total bacterial burden and proportion of colonization of fomites and surroundings by multidrug-resistance organisms (MDROs) were determined before and after the intervention. The demographic characteristics, underlying conditions, and clinical outcomes of patients were analyzed. After application of Bio-Kil, the bacterial burden declined in both groups, although the reduction was greater in the study rooms as compared with the control rooms (p = 0.001). During the pre-intervention period, 16 patients were admitted to control rooms and 18 patients to study rooms. After the intervention, 22 patients were admitted to control rooms and 21 patients to study rooms. The number of cases of new-onset sepsis declined in the intervention group (from 33% to 23.8%), but increased in the control group (from 25% to 40.9%); however, there was no significant difference in incidence of new-onset sepsis between the study and control rooms after intervention. Application of Bio-Kil reduced the environmental bacterial burden and MDROs in ICUs. Further studies are needed to evaluate the efficacy of this nanotechnology-based disinfectant in reducing HAIs. Copyright © 2016. Published by Elsevier B.V.
Low gamma counting for measuring NORM/TENORM with a radon reducing system
NASA Astrophysics Data System (ADS)
Paschoa, Anselmo S.
2001-06-01
A detection system for counting low levels of gamma radiation was built by upgrading an existing rectangular chamber made of 18 metric tonne of steel fabricated before World War II. The internal walls, the ceiling, and the floor of the chamber are covered with copper sheets. The new detection system consists of a stainless steel hollow cylinder with variable circular apertures in the cylindrical wall and in the base, to allow introduction of a NaI (Tl) crystal, or alternatively, a HPGe detector in its interior. This counting system is mounted inside the larger chamber, which in turn is located in a subsurface air-conditioned room. The access to the subsurface room is made from a larger entrance room through a tunnel plus a glass anteroom to decrease the air-exchange rate. Both sample and detector are housed inside the stainless steel cylinder. This cylinder is filled with hyper pure nitrogen gas, before counting a sample, to prevent radon coming into contact with the detector surface. As a consequence, the contribution of the 214Bi photopeaks to the background gamma spectra is minimized. The reduction of the gamma radiation background near the detector facilitates measurement of naturally occurring radioactive materials (NORM), and/or technologically enhanced NORM (TENORM), which are usually at concentration levels only slightly higher than those typically found in the natural radioactive background.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neubauer, Michael; Dudas, Alan; Krasnykh, Anatoly
Through a combination of experimentation and calculation the components of a novel room temperature dry load were successfully fabricated. These components included lossy ceramic cylinders of various lengths, thicknesses, and percent of silicon carbide (SiC). The cylinders were then assembled into stainless steel compression rings by differential heating of the parts and a special fixture. Post machining of this assembly provided a means for a final weld. The ring assemblies were then measured for S-parameters, individually and in pairs using a low-cost TE10 rectangular to TE01 circular waveguide adapter specially designed to be part of the final load assembly. Matchedmore » pairs of rings were measured for assembly into the final load, and a sliding short designed and fabricated to assist in determining the desired short location in the final assembly. The plan for the project was for Muons, Inc. to produce prototype loads for long-term testing at SLAC. The STTR funds for SLAC were to upgrade and operate their test station to ensure that the loads would satisfy their requirements. Phase III was to be the sale to SLAC of loads that Muons, Inc. would manufacture. However, an alternate solution that involved a rebuild of the old loads, reduced SLAC budget projections, and a relaxed time for the replacement of all loads meant that in-house labor will be used to do the upgrade without the need for the loads developed in this project. Consequently, the project was terminated before the long term testing was initiated. However, SLAC can use the upgraded test stand to compare the long-term performance of the ones produced in this project with their rebuilt loads when they are available.« less
Upgrading Custom Simulink Library Components for Use in Newer Versions of Matlab
NASA Technical Reports Server (NTRS)
Stewart, Camiren L.
2014-01-01
The Spaceport Command and Control System (SCCS) at Kennedy Space Center (KSC) is a control system for monitoring and launching manned launch vehicles. Simulations of ground support equipment (GSE) and the launch vehicle systems are required throughout the life cycle of SCCS to test software, hardware, and procedures to train the launch team. The simulations of the GSE at the launch site in conjunction with off-line processing locations are developed using Simulink, a piece of Commercial Off-The-Shelf (COTS) software. The simulations that are built are then converted into code and ran in a simulation engine called Trick, a Government off-the-shelf (GOTS) piece of software developed by NASA. In the world of hardware and software, it is not uncommon to see the products that are utilized be upgraded and patched or eventually fade away into an obsolete status. In the case of SCCS simulation software, Matlab, a MathWorks product, has released a number of stable versions of Simulink since the deployment of the software on the Development Work Stations in the Linux environment (DWLs). The upgraded versions of Simulink has introduced a number of new tools and resources that, if utilized fully and correctly, will save time and resources during the overall development of the GSE simulation and its correlating documentation. Unfortunately, simply importing the already built simulations into the new Matlab environment will not suffice as it will produce results that may not be expected as they were in the version that is currently being utilized. Thus, an upgrade execution plan was developed and executed to fully upgrade the simulation environment to one of the latest versions of Matlab.
Controlling the Cost of C4I Upgrades on Naval Ships
2009-01-01
Dynamics Electric Boat and Northrop Grumman Newport News. To analyze cost drivers, variability within costs, and the accuracy of the Navy’s cost...design also features a zonal electricity grid that allows power to be directed throughout the ship where and when it is needed. C4I-Upgrade Issues...class for hull, mechanical, and electrical equip- ment and systems. However, because C4I technologies can change one or two times during the three
Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade)
2013-12-01
MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other PAUC - Program Acquisition Unit Cost PB - President’s...and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be Determined TY - Then Year UCR - Unit Cost Reporting AWACS Blk...Objective and Threshold, and Current Estimate for IOT&E milestone have been corrected from June 2011 to June 2012, to reflect the actual date of
Maintenance Management Information and Control System (MMICS). Administrative Boon or Burden.
1984-03-01
training schools (fundamentals and theory ) for the particular career field; through correspondence courses developed and written by the Air Force, and...are identified, scheduled and done on a timely basis. 6 "The administration of an individual’s Upgrade Training ( UGT ) to meet the job knowledge and...formal OJT must study and complete a Career Develop- ment Course (CDC) as part of their upgrade training ( UGT ). The progress and status of the course is
NASA Technical Reports Server (NTRS)
Tarshish, Adina; Salmon, Ellen
1994-01-01
In October 1992, the NASA Center for Computational Sciences made its Convex-based UniTree system generally available to users. The ensuing months saw growth in every area. Within 26 months, data under UniTree control grew from nil to over 12 terabytes, nearly all of it stored on robotically mounted tape. HiPPI/UltraNet was added to enhance connectivity, and later HiPPI/TCP was added as well. Disks and robotic tape silos were added to those already under UniTree's control, and 18-track tapes were upgraded to 36-track. The primary data source for UniTree, the facility's Cray Y-MP/4-128, first doubled its processing power and then was replaced altogether by a C98/6-256 with nearly two-and-a-half times the Y-MP's combined peak gigaflops. The Convex/UniTree software was upgraded from version 1.5 to 1.7.5, and then to 1.7.6. Finally, the server itself, a Convex C3240, was upgraded to a C3830 with a second I/O bay, doubling the C3240's memory and capacity for I/O. This paper describes insights gained and reinforced with the burgeoning demands on the UniTree storage system and the significant increases in performance gained from the many upgrades.
Performance upgrades in the EUV engineering test stand
NASA Astrophysics Data System (ADS)
Tichenor, Daniel A.; Replogle, William C.; Lee, Sang Hun; Ballard, William P.; Leung, Alvin H.; Kubiak, Glenn D.; Klebanoff, Leonard E.; Graham, Samual, Jr.; Goldsmith, John E. M.; Jefferson, Karen L.; Wronosky, John B.; Smith, Tony G.; Johnson, Terry A.; Shields, Harry; Hale, Layton C.; Chapman, Henry N.; Taylor, John S.; Sweeney, Donald W.; Folta, James A.; Sommargren, Gary E.; Goldberg, Kenneth A.; Naulleau, Patrick P.; Attwood, David T., Jr.; Gullikson, Eric M.
2002-07-01
The EUV Engineering Test Stand (ETS) has demonstrated the printing of 100-nm-resolution scanned images. This milestone was first achieved while the ETS operated in an initial configuration using a low power laser and a developmental projection system, PO Box 1. The drive laser has ben upgraded to a single chain of the three-chain Nd:YAG laser developed by TRW. The result in exposure time is approximately 4 seconds for static exposures. One hundred nanometer dense features have been printed in step-and-scan operation with the same image quality obtained in static printing. These experiments are the first steps toward achieving operation using all three laser chains for a total drive laser power of 1500 watts. In a second major upgrade the developmental wafer stage platen, used to demonstrate initial full-field imaging, has been replaced with the final low-expansion platen made of Zerodur. Additional improvements in the hardware and control software have demonstrated combined x and jitter from 2 to 4 nm RMS Over most of the wafer stage travel range, while scanning at the design scan speed of 10 mm/s at the wafer. This value, less than half of the originally specified jitter, provides sufficient stability to support printing of 70 nm features as planned, when the upgraded projection system is installed. The third major upgrade will replace PO Box 1 with an improved projection system, PO Box 2, having lower figure error and lower flare. In addition to these upgrades, dose sensors at the reticle and wafer planes and an EUV- sensitive aerial image monitor have been integrated into the ETS. This paper reports on ETS system upgrades and the impact on system performance.
Nap environment control considering respiration rate and music tempo by using sensor agent robot
NASA Astrophysics Data System (ADS)
Nakaso, Sayaka; Mita, Akira
2015-03-01
We propose a system that controls a nap environment considering respiration rates and music tempo by using a sensor agent robot. The proposed system consists of two sub-systems. The first sub-system measures respiration rates using optical flow. We conducted preparatory experiments to verify the accuracy of this sub-system. The experimental results showed that this sub-system can measure the respiration rates accurately despite several positional relationships. It was also shown that the accuracy could be affected by clothes, movements and light. The second sub-system we constructed was the music play sub-system that chooses music with the certain tempo corresponding to the respiration rates measured by the first sub-system. We conducted verification experiments to verify the effectiveness of this music play sub-system. The experimental results showed the effectiveness of varying music tempo based on the respiration rates in taking a nap. We also demonstrated this system in a real environment; a subject entered into the room being followed by ebioNα. When the subject was considered sleeping, ebioNα started measuring respiration rates, controlling music based on the respiration rates. As a result, we showed that this system could be realized. As a next step, we would like to improve this system to a nap environment control system to be used in offices. To realize this, we need to update the first sub-system measuring respiration rates by removing disturbances. We also need to upgrade music play sub-system considering the numbers of tunes, the kinds of music and time to change music.
Education in Helium Refrigeration
NASA Astrophysics Data System (ADS)
Gistau Baguer, G. M.
2004-06-01
On the one hand, at the end of the time I was active in helium refrigeration, I noticed that cryogenics was stepping into places where it was not yet used. For example, a conventional accelerator, operating at room temperature, was to be upgraded to reach higher particle energy. On the other hand, I was a little bit worried to let what I had so passionately learned during these years to be lost. Retirement made time available, and I came gradually to the idea to teach about what was my basic job. I thought also about other kinds of people who could be interested in such lessons: operators of refrigerators or liquefiers who, often by lack of time, did not get a proper introduction to their job when they started, young engineers who begin to work in cryogenics… and so on. Consequently, I have assembled a series of lessons about helium refrigeration. As the audiences have different levels of knowledge in the field of cryogenics, I looked for a way of teaching that is acceptable for all of them. The course is split into theory of heat exchangers, refrigeration cycles, technology and operation of main components, process control, and helium purity.
DOT National Transportation Integrated Search
1971-06-01
An analysis has been made of the potentialities and problems involved in assigning some computer processing and control functions to the remote sites in an upgraded third generation air traffic control system. Interrogator sites offer the most fruitf...
Comparison of acoustic fields produced by the original and upgraded HM-3 lithotripter
NASA Astrophysics Data System (ADS)
Zhou, Yufeng; Zhu, Songlin; Dreyer, Thomas; Liebler, Marko; Zhong, Pei
2003-10-01
To reduce tissue injury in shock wave lithotripsy (SWL) while maintaining satisfactory stone comminution, an original HM-3 lithotripter was upgraded by a reflector insert to suppress large intraluminal bubble expansion, which is a primary mechanism of vascular injury in SWL. The pressure waveforms produced by the original and upgraded HM-3 lithotripter were measured by using a fiber optical probe hydrophone (FOPH), which was scanned both along and transverse to the lithotripter axis at 1-mm step using a computer-controlled 3-D positioning system. At F2, the pressure waveform produced by the upgraded HM-3 lithotripter at 22 kV has a distinct dual-pulse structure, with a leading shock wave of ~45 MPa from the reflector insert and a 4-μs delayed second pulse of ~15 MPa reflected from the uncovered bottom surface of the original HM-3 reflector. The beam sizes of the original and upgraded HM-3 lithotripter are comparable in both axial and lateral directions. The pressure waveforms measured at the reflector aperture will be used as input to the KZK equation to predict the lithotripter shock wave at F2. Furthermore, bubble dynamics predicted by the Gilmore model will be compared with experimental observation by high-speed imaging. [Work supported by NIH.
Main Control Room, view to the east. The door to ...
Main Control Room, view to the east. The door to the motor room is to the right, and the main control cabinets are to the left - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Fink, D. Hill, J. O'Hara
2004-11-30
Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.
Master-slave control scheme in electric vehicle smart charging infrastructure.
Chung, Ching-Yen; Chynoweth, Joshua; Chu, Chi-Cheng; Gadh, Rajit
2014-01-01
WINSmartEV is a software based plug-in electric vehicle (PEV) monitoring, control, and management system. It not only incorporates intelligence at every level so that charge scheduling can avoid grid bottlenecks, but it also multiplies the number of PEVs that can be plugged into a single circuit. This paper proposes, designs, and executes many upgrades to WINSmartEV. These upgrades include new hardware that makes the level 1 and level 2 chargers faster, more robust, and more scalable. It includes algorithms that provide a more optimal charge scheduling for the level 2 (EVSE) and an enhanced vehicle monitoring/identification module (VMM) system that can automatically identify PEVs and authorize charging.
Master-Slave Control Scheme in Electric Vehicle Smart Charging Infrastructure
Chung, Ching-Yen; Chynoweth, Joshua; Chu, Chi-Cheng; Gadh, Rajit
2014-01-01
WINSmartEV is a software based plug-in electric vehicle (PEV) monitoring, control, and management system. It not only incorporates intelligence at every level so that charge scheduling can avoid grid bottlenecks, but it also multiplies the number of PEVs that can be plugged into a single circuit. This paper proposes, designs, and executes many upgrades to WINSmartEV. These upgrades include new hardware that makes the level 1 and level 2 chargers faster, more robust, and more scalable. It includes algorithms that provide a more optimal charge scheduling for the level 2 (EVSE) and an enhanced vehicle monitoring/identification module (VMM) system that can automatically identify PEVs and authorize charging. PMID:24982956
Real-time feedback control of the plasma density profile on ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Mlynek, A.; Reich, M.; Giannone, L.; Treutterer, W.; Behler, K.; Blank, H.; Buhler, A.; Cole, R.; Eixenberger, H.; Fischer, R.; Lohs, A.; Lüddecke, K.; Merkel, R.; Neu, G.; Ryter, F.; Zasche, D.; ASDEX Upgrade Team
2011-04-01
The spatial distribution of density in a fusion experiment is of significant importance as it enters in numerous analyses and contributes to the fusion performance. The reconstruction of the density profile is therefore commonly done in offline data analysis. In this paper, we present an algorithm which allows for density profile reconstruction from the data of the submillimetre interferometer and the magnetic equilibrium in real-time. We compare the obtained results to the profiles yielded by a numerically more complex offline algorithm. Furthermore, we present recent ASDEX Upgrade experiments in which we used the real-time density profile for active feedback control of the shape of the density profile.
Poster - Thur Eve - 29: Detecting changes in IMRT QA using statistical process control.
Drever, L; Salomons, G
2012-07-01
Statistical process control (SPC) methods were used to analyze 239 measurement based individual IMRT QA events. The selected IMRT QA events were all head and neck (H&N) cases with 70Gy in 35 fractions, and all prostate cases with 76Gy in 38 fractions planned between March 2009 and 2012. The results were used to determine if the tolerance limits currently being used for IMRT QA were able to indicate if the process was under control. The SPC calculations were repeated for IMRT QA of the same type of cases that were planned after the treatment planning system was upgraded from Eclipse version 8.1.18 to version 10.0.39. The initial tolerance limits were found to be acceptable for two of the three metrics tested prior to the upgrade. After the upgrade to the treatment planning system the SPC analysis found that the a priori limits were no longer capable of indicating control for 2 of the 3 metrics analyzed. The changes in the IMRT QA results were clearly identified using SPC, indicating that it is a useful tool for finding changes in the IMRT QA process. Routine application of SPC to IMRT QA results would help to distinguish unintentional trends and changes from the random variation in the IMRT QA results for individual plans. © 2012 American Association of Physicists in Medicine.
Collaborative engineering and design management for the Hobby-Eberly Telescope tracker upgrade
NASA Astrophysics Data System (ADS)
Mollison, Nicholas T.; Hayes, Richard J.; Good, John M.; Booth, John A.; Savage, Richard D.; Jackson, John R.; Rafal, Marc D.; Beno, Joseph H.
2010-07-01
The engineering and design of systems as complex as the Hobby-Eberly Telescope's* new tracker require that multiple tasks be executed in parallel and overlapping efforts. When the design of individual subsystems is distributed among multiple organizations, teams, and individuals, challenges can arise with respect to managing design productivity and coordinating successful collaborative exchanges. This paper focuses on design management issues and current practices for the tracker design portion of the Hobby-Eberly Telescope Wide Field Upgrade project. The scope of the tracker upgrade requires engineering contributions and input from numerous fields including optics, instrumentation, electromechanics, software controls engineering, and site-operations. Successful system-level integration of tracker subsystems and interfaces is critical to the telescope's ultimate performance in astronomical observation. Software and process controls for design information and workflow management have been implemented to assist the collaborative transfer of tracker design data. The tracker system architecture and selection of subsystem interfaces has also proven to be a determining factor in design task formulation and team communication needs. Interface controls and requirements change controls will be discussed, and critical team interactions are recounted (a group-participation Failure Modes and Effects Analysis [FMEA] is one of special interest). This paper will be of interest to engineers, designers, and managers engaging in multi-disciplinary and parallel engineering projects that require coordination among multiple individuals, teams, and organizations.
Threat radar system simulations
NASA Astrophysics Data System (ADS)
Miller, L.
The capabilities, requirements, and goals of radar emitter simulators are discussed. Simulators are used to evaluate competing receiver designs, to quantify the performance envelope of a radar system, and to model the characteristics of a transmitted signal waveform. A database of candidate threat systems is developed and, in concert with intelligence data on a given weapons system, permits upgrading simulators to new projected threat capabilities. Four currently available simulation techniques are summarized, noting the usefulness of developing modular software for fast controlled-cost upgrades of simulation capabilities.
2000-03-01
discussed. There are two requirements of the permit designed to meet the goals of the program: 1) design and implementation of BMPs to control runoff...affect these species. NMFS is aware that specific upgrades to the sanitary sewer and storm drainage systems have yet to be designed and the proposed...Specific 8 upgrades to the sanitary sewer and storm drainage systems, though not yet designed , 9 will meet both City and County of San Francisco and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haase, M.; Hine, C.; Robertson, C.
1996-12-31
Approximately five years ago, the Safe, Secure Dismantlement program was started between the US and countries of the Former Soviet Union (FSU). The purpose of the program is to accelerate progress toward reducing the risk of nuclear weapons proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This would be accomplished by strengthening the material protection, control, and accounting systems within the FSU countries. Under the US Department of Energy`s program of providing cooperative assistance to the FSU countries in the areas of Material Protection, Control, and Accounting (MPC and A), the Latvian Academy of Sciencesmore » Nuclear Research Center (LNRC) near Riga, Latvia, was identified as a candidate site for a cooperative MPC and A project. The LNRC is the site of a 5-megawatt IRT-C pool-type research reactor. This paper describes: the process involved, from initial contracting to project completion, for the physical protection upgrades now in place at the LNRC; the intervening activities; and a brief overview of the technical aspects of the upgrades.« less
Effects of high-pressure extruding pretreatment on MSW upgrading and hydrolysis enhancement.
Xu, Shuang; Kong, Xin; Liu, Jianguo; Zhao, Ke; Zhao, Guangqi; Bahdolla, Amanjol
2016-12-01
High-pressure extruding (HPE) is an efficient technology used to separate municipal solid waste (MSW) into wet (biodegradable) and dry (combustible) fractions. Effects of pressure, 10, 20, 30, and 40MPa on quality upgrading of the MSW and hydrolysis of the wet fraction were examined. TS of the dry fraction increased from 48.5% to 59.4% when the extruding pressure increased from 10 to 40MPa, meanwhile the biochemical methane potential (BMP) of the wet fraction extruded under 40MPa was 674mL CH 4 /g·VS, 33% higher than that of the organic fraction of the MSW (OFMSW) control. Furthermore, in the initial stage of hydrolysis experiment, the extruded wet fractions had lower pH and higher COD, volatile fatty acids (VFAs) and COD/VFA than those of the OFMSW control. The results confirmed that HPE upgraded the MSW and enhanced hydrolysis of the wet fractions. However, high extruding pressure as 40MPa aggravated the excessive acidification of the wet fractions. Copyright © 2016 Elsevier Ltd. All rights reserved.
Partial detachment of high power discharges in ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Kallenbach, A.; Bernert, M.; Beurskens, M.; Casali, L.; Dunne, M.; Eich, T.; Giannone, L.; Herrmann, A.; Maraschek, M.; Potzel, S.; Reimold, F.; Rohde, V.; Schweinzer, J.; Viezzer, E.; Wischmeier, M.; the ASDEX Upgrade Team
2015-05-01
Detachment of high power discharges is obtained in ASDEX Upgrade by simultaneous feedback control of core radiation and divertor radiation or thermoelectric currents by the injection of radiating impurities. So far 2/3 of the ITER normalized heat flux Psep/R = 15 MW m-1 has been obtained in ASDEX Upgrade under partially detached conditions with a peak target heat flux well below 10 MW m-2. When the detachment is further pronounced towards lower peak heat flux at the target, substantial changes in edge localized mode (ELM) behaviour, density and radiation distribution occur. The time-averaged peak heat flux at both divertor targets can be reduced below 2 MW m-2, which offers an attractive DEMO divertor scenario with potential for simpler and cheaper technical solutions. Generally, pronounced detachment leads to a pedestal and core density rise by about 20-40%, moderate (<20%) confinement degradation and a reduction of ELM size. For AUG conditions, some operational challenges occur, like the density cut-off limit for X-2 electron cyclotron resonance heating, which is used for central tungsten control.
Physics-based Control-oriented Modeling of the Current Profile Evolution in NSTX-Upgrade
NASA Astrophysics Data System (ADS)
Ilhan, Zeki; Barton, Justin; Shi, Wenyu; Schuster, Eugenio; Gates, David; Gerhardt, Stefan; Kolemen, Egemen; Menard, Jonathan
2013-10-01
The operational goals for the NSTX-Upgrade device include non-inductive sustainment of high- β plasmas, realization of the high performance equilibrium scenarios with neutral beam heating, and achievement of longer pulse durations. Active feedback control of the current profile is proposed to enable these goals. Motivated by the coupled, nonlinear, multivariable, distributed-parameter plasma dynamics, the first step towards feedback control design is the development of a physics-based, control-oriented model for the current profile evolution in response to non-inductive current drives and heating systems. For this purpose, the nonlinear magnetic-diffusion equation is coupled with empirical models for the electron density, electron temperature, and non-inductive current drives (neutral beams). The resulting first-principles-driven, control-oriented model is tailored for NSTX-U based on the PTRANSP predictions. Main objectives and possible challenges associated with the use of the developed model for control design are discussed. This work was supported by PPPL.
Project Design Concept for Monitoring and Control System
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCGREW, D.L.
2000-10-02
This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations.
Feedback controlled, reactor relevant, high-density, high-confinement scenarios at ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Lang, P. T.; Blanken, T. C.; Dunne, M.; McDermott, R. M.; Wolfrum, E.; Bobkov, V.; Felici, F.; Fischer, R.; Janky, F.; Kallenbach, A.; Kardaun, O.; Kudlacek, O.; Mertens, V.; Mlynek, A.; Ploeckl, B.; Stober, J. K.; Treutterer, W.; Zohm, H.; ASDEX Upgrade Team
2018-03-01
One main programme topic at the ASDEX Upgrade all-metal-wall tokamak is development of a high-density regime with central densities at reactor grade level while retaining high-confinement properties. This required development of appropriate control techniques capable of coping with the pellet tool, a powerful means of fuelling but one which presented challenges to the control system for handling of related perturbations. Real-time density profile control was demonstrated, raising the core density well above the Greenwald density while retaining the edge density in order to avoid confinement losses. Recently, a new model-based approach was implemented that allows direct control of the central density. Investigations focussed first on the N-seeding scenario owing to its proven potential to yield confinement enhancements. Combining pellets and N seeding was found to improve the divertor buffering further and enhance the operational range accessible. For core densities up to about the Greenwald density, a clear improvement with respect to the non-seeding reference was achieved; however, at higher densities this benefit is reduced. This behaviour is attributed to recurrence of an outward shift of the edge density profile, resulting in a reduced peeling-ballooning stability. This is similar to the shift seen during strong gas puffing, which is required to prevent impurity influx in ASDEX Upgrade. First tests indicate that highly-shaped plasma configurations like the ITER base-line scenario, respond very well to pellet injection, showing efficient fuelling with no measurable impact on the edge density profile.
Major refit of R/V MARION DUFRESNE and giant sediment corer improvements
NASA Astrophysics Data System (ADS)
Leau, Hélène; Réaud, Yvan
2015-04-01
The french Research Vessel MARION DUFRESNE is equipped with a unique sediment coring facility, called CALYPSO, developed initially by Yvon BALUT at the French Polar Institute, Paul-Emile Victor (IPEV) that operates the vessel 217 days per year in all oceans. The CALYPSO sediment corer retrieves routinely 50 m long undisturbed sediment cores in any water depths, and presently holds the worldwide record of the longest core ever retrieved, that is 64.5 m. This vessel is then a fantastic opportunity for the paleoceanographic community to carry out expeditions at sea. Over the last 20 years, many international IMAGES coring expeditions were organized in all the ocean basins around the world on board the R/V MARION DUFRESNE. More than 1500 cores were retrieved, leading to major advances in the paleoceanography and paleoclimatology of the Late Quaternary. The vessel will celebrate her 20th anniversary in 2015 and will undergo a major refit on hull & machineries, public spaces, as well as scientific equipment. The coring capacity is currently being developed to further improve - The length of the retrievable core, with an objective of 75 m long core in routine - The quality of the sediment un-disturbance with a specially designed coring cable with controlled minimum elasticity - The safety of the operations at sea - The quality control of the operations with a suite of sensors and software allowing a detailed monitoring of the coring operation - The time requested for each operation - The environment data collection, in the same time as the coring operations The detailed description of the upgrades will be presented. They consist in a new suite of acoustic sensors that will be integrated on board the vessel during the 4 months ship yard stay from April to July 2015, amongst which a KONSBERG EM122 multibeam echo-sounder and a SBP 120-3 sub-bottom profiler, both mounted on a gondola fitted under the hull of the vessel. This equipment will allow the highest quality images of the seabed and upper sediment, allowing accurate survey of the coring targets. Scientific deck equipment, such as coring winch and associated A frame, hydrological winch and deployment system, will be upgraded, the coring operating equipment being brought up to 45 t SWL. The ship side will be modified to allow the deployment of 75 m long corer. Finally, the laboratories will be renovated and the main PC room will be redistributed in order to offer more space to the scientific party and secure a new IT dedicated room. The vessel will undergo a series of tests at sea before being available to the scientific community again from January 2016. As before her midlife refit, IPEV wishes to carry on training programs such as "University at Sea" and EGU supported "Teachers at sea" program in association with future paleoceanographic activities.
Successful Strategies for Rapidly Upgrading PTC Windchill 9.1 to Windchill 10.1 on a Light Budget
NASA Technical Reports Server (NTRS)
Shearrow, Charles A.
2013-01-01
Topics covered include: The Frugal Times Historical Upgrade Process; Planning for Possible Constraints; PTC Compatibility Matrix; In-Place Upgrade Process; Pre-Upgrade Activities; Upgrade Activities; Post Upgrade Activities; Results of the Upgrade; Tips for an Upgrade On a Shoestring Budget.
Maximum performance synergy: A new approach to recording studio control room design
NASA Astrophysics Data System (ADS)
Szymanski, Jeff D.
2003-10-01
Popular recording studio control room designs include LEDE(tm), RFZ(tm), and nonenvironment rooms. The common goal of all of these is to create an accurate acoustical environment that does not distort or otherwise color audio reproduction. Also common to these designs is the frequent need to have multiple ancillary recording rooms, often adjacent to the main control room, where group members perform. This approach, where group members are physically separated from one another, can lead to lack of ensemble in the finished recordings. New twists on old acoustical treatment techniques have been implemented at a studio in Nashville, Tennessee, which minimize the need for multiple ancillary recording rooms, thus creating an environment where talent, producer and recording professionals can all occupy the same space for maximum performance synergy. Semi-separated performance areas are designed around a central, critical listening area. The techniques and equipment required to achieve this separation are reviewed, as are advantages and disadvantages to this new control room design approach.
Pegasus power system facility upgrades
NASA Astrophysics Data System (ADS)
Lewicki, B. T.; Kujak-Ford, B. A.; Winz, G. R.
2008-11-01
Two key Pegasus systems have been recently upgraded: the Ohmic-transformer IGCT bridge control system, and the plasma-gun injector power system. The Ohmic control system contains two new microprocessor controlled components to provide an interface between the PWM controller and the IGCT bridges. An interface board conditions the command signals from the PWM controller. A splitter/combiner board routes the conditioned PWM commands to an array of IGCT bridges and interprets IGCT bridge status. This system allows for any PWM controller to safely control IGCT bridges. Future developments will include a transition to a polyphasic bridge control. This will allow for 3 to 4 times the present pulse length and provide a much higher switching frequency. The plasma gun injector system now includes active current feedback control on gun bias current via PWM buck type power supplies. Near term goals include a doubling or tripling of the applied bias voltage. Future arc bias system power supplies may include a simpler boost type system which will allow access to even higher voltages using existing low voltage energy storage systems.
A high-sensitivity EM-CCD camera for the open port telescope cavity of SOFIA
NASA Astrophysics Data System (ADS)
Wiedemann, Manuel; Wolf, Jürgen; McGrotty, Paul; Edwards, Chris; Krabbe, Alfred
2016-08-01
The Stratospheric Observatory for Infrared Astronomy (SOFIA) has three target acquisition and tracking cameras. All three imagers originally used the same cameras, which did not meet the sensitivity requirements, due to low quantum efficiency and high dark current. The Focal Plane Imager (FPI) suffered the most from high dark current, since it operated in the aircraft cabin at room temperatures without active cooling. In early 2013 the FPI was upgraded with an iXon3 888 from Andor Techonolgy. Compared to the original cameras, the iXon3 has a factor five higher QE, thanks to its back-illuminated sensor, and orders of magnitude lower dark current, due to a thermo-electric cooler and "inverted mode operation." This leads to an increase in sensitivity of about five stellar magnitudes. The Wide Field Imager (WFI) and Fine Field Imager (FFI) shall now be upgraded with equally sensitive cameras. However, they are exposed to stratospheric conditions in flight (typical conditions: T≍-40° C, p≍ 0:1 atm) and there are no off-the-shelf CCD cameras with the performance of an iXon3, suited for these conditions. Therefore, Andor Technology and the Deutsches SOFIA Institut (DSI) are jointly developing and qualifying a camera for these conditions, based on the iXon3 888. These changes include replacement of electrical components with MIL-SPEC or industrial grade components and various system optimizations, a new data interface that allows the image data transmission over 30m of cable from the camera to the controller, a new power converter in the camera to generate all necessary operating voltages of the camera locally and a new housing that fulfills airworthiness requirements. A prototype of this camera has been built and tested in an environmental test chamber at temperatures down to T=-62° C and pressure equivalent to 50 000 ft altitude. In this paper, we will report about the development of the camera and present results from the environmental testing.
5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1A, DIRECTORATE OF ...
5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1-A, DIRECTORATE OF MISSILE CAPTIVE TEST, EDWARDS AFB, 15 JAN 58, 3097.58." Two men working in the control room. Photo no. "3097 58; G-AFFTC 15 JAN 58, T.S. 1-A Control". - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
NASA Astrophysics Data System (ADS)
Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi
2011-05-01
A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.
Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector
Hasegawa, S.
2016-04-23
The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is duemore » to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature ($-$20 °C).« less
Upgrading of the STP Uithoorn: treatment of nutrient rich wastewater from horticulture.
Piekema, P; Neef, R
2005-01-01
The STP Uithoorn will be upgraded to accommodate the treatment of wastewater from a growing population and to meet more stringent nutrient discharge limits in 2006. In 2003 a system choice and preliminary design was made for the upgrading. A special feature is the nutrient rich wastewater flow from the rapidly developing horticulture in the area. Since the future loads from horticulture are highly uncertain, flexibility of the STP after upgrading is an important issue. A three stage system was selected: improved physical-chemical primary treatment, secondary treatment by activated sludge, and tertiary treatment by denitrifying filters. In this way an important part of the existing infrastructure can be reused, and flexibility is assured by constructing the tertiary treatment in modules and by providing a wide range of operational control possibilities. In this paper the process of system choice and selection of type of tertiary treatment are described, as well as the optimisation of the existing treatment. In order to determine the feasibility of allowing a high loading rate on the existing secondary clarifiers, a two-dimensional hydraulic model of the clarification process was used.
Duan, Dengle; Ruan, Roger; Lei, Hanwu; Liu, Yuhuan; Wang, Yunpu; Zhang, Yayun; Zhao, Yunfeng; Dai, Leilei; Wu, Qiuhao; Zhang, Shumei
2018-06-01
The co-pyrolysis of pretreated lignin and soapstock was carried out to upgrade vapors under microwave irradiation. Results showed that the yield of 29.92-42.21 wt% of upgraded liquid oil was achieved under varied pretreatment conditions. Char yield decreased from 32.44 wt% for untreated control to 24.35 wt% for the 150 °C pretreated samples. The increased temperature, irradiation time and acid concentration were conducive to decrease the relative contents of phenols and oxygenates in liquid oils. The main components of the liquid oil were gasoline fraction (mono-aromatics and C5-C12 aliphatics), which ranged from 57.38 to 71.98% under various pretreatment conditions. Meanwhile, the diesel fraction (C12+ aliphatics) ranged from 13.16 to 22.62% from co-pyrolysis of pretreated lignin and soapstock, comparing with 10.18% of C12+ aliphatics from co-pyrolysis of non-pretreated lignin and soapstock. A possible mechanism was proposed for co-pyrolysis of pretreated lignin and soapstock for upgraded liquid oils. Copyright © 2018 Elsevier Ltd. All rights reserved.
The XENONnT Dark Matter Experiment
NASA Astrophysics Data System (ADS)
Aprile, Elena; Xenon Collaboration
2017-01-01
With XENON1T ready to search for dark matter with the highest sensivity of any experiment to-date the XENON collaboration started to secure funding and resources to upgrade the detector by the end of 2018- phase which we refer to as XENONnT. The XENONnT experiment will utilize the already-built-and-tested XENON1T infrastructures, such as the cryogenic system, Kr distillation system and Xe storage and recovery system, with the main upgrade of the time projection chamber (TPC). The upgraded XENONnT detector will be filled with 7.5-ton ultra-pure liquid xenon, tripling the active liquid xenon target mass of XENON1T. About 500 low-radioactive three-inch R11410 PMTs will be used. Background from internal sources such as radon will be reduced. It will enable another order of magnitude improvement in dark matter search sensitivity compared to that of XENON1T, or accumulate statistics if a positive dark matter signal is observed by XENON1T. The detailed TPC upgrade plan, the background control and reduction techniques, the predicted sensitivity reach will be presented.
Feedback-controlled NTM stabilization on ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Stober, J.; Barrera, L.; Behler, K.; Bock, A.; Buhler, A.; Eixenberger, H.; Giannone, L.; Kasparek, W.; Maraschek, M.; Mlynek, A.; Monaco, F.; Poli, E.; Rapson, C. J.; Reich, M.; Schubert, M.; Treutterer, W.; Wagner, D.; Zohm, H.
2015-03-01
On ASDEX Upgrade a concept for real-time stabilization of NTMs has been realized and successfully applied to (3,2)- and (2,1)-NTMs. Since most of the work has meanwhile been published elsewhere, a short summary with the appropriate references is given. Limitations, deficits and future extensions of the system are discussed. In a second part the recent work on using modulated ECCD for NTM stabilisation is described in some detail. In these experiments ECCD power is modulated according to a magnetic footprint of the rotating NTM. In agreement with earlier results it could be shown that O-point heating reduces the necessary average power for stabilisation whereas X-point heating hampers stabilisation. Although this modulated scheme is not relevant for routine NTM stabilisation on ASDEX Upgrade it may be mandatory for ITER or DEMO. On ASDEX Upgrade it has been re-developed to demonstrate the usage of a FAst DIrectional Switch to continously heat the O-point of the rotating island with only one gyrotron switching between two launchers which target the mode at locations separated in phase by 180 degrees as described in [1].
New developments in instrumentation at the W. M. Keck Observatory
NASA Astrophysics Data System (ADS)
Adkins, Sean M.; Armandroff, Taft E.; Fitzgerald, Michael P.; Johnson, James; Larkin, James E.; Lewis, Hilton A.; Martin, Christopher; Matthews, Keith Y.; Prochaska, J. X.; Wizinowich, Peter
2014-07-01
The W. M. Keck Observatory continues to develop new capabilities in support of our science driven strategic plan which emphasizes leadership in key areas of observational astronomy. This leadership is a key component of the scientific productivity of our observing community and depends on our ability to develop new instrumentation, upgrades to existing instrumentation, and upgrades to supporting infrastructure at the observatory. In this paper we describe the as measured performance of projects completed in 2014 and the expected performance of projects currently in the development or construction phases. Projects reaching completion in 2014 include a near-IR tip/tilt sensor for the Keck I adaptive optics system, a new center launch system for the Keck II laser guide star facility, and NIRES, a near-IR Echelle spectrograph for the Keck II telescope. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, a deployable tertiary mirror for the Keck I telescope, upgrades to the spectrograph detector and the imager of the OSIRIS instrument, and an upgrade to the telescope control systems on both Keck telescopes.
Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation
NASA Technical Reports Server (NTRS)
Lux-Baumann, Jesica; Dees, Ray; Fratello, David
2006-01-01
The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.
Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation
NASA Technical Reports Server (NTRS)
Lux-Baumann, Jessica R.; Dees, Ray A.; Fratello, David J.
2006-01-01
The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.
A computerized aircraft battery servicing facility
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1992-01-01
The latest upgrade to the Aerospace Energy Systems Laboratory (AESL) is described. The AESL is a distributed digital system consisting of a central system and battery servicing stations connected by a high-speed serial data bus. The entire system is located in two adjoining rooms; the bus length is approximately 100 ft. Each battery station contains a digital processor, data acquisition, floppy diskette data storage, and operator interfaces. The operator initiates a servicing task and thereafter the battery station monitors the progress of the task and terminates it at the appropriate time. The central system provides data archives, manages the data bus, and provides a timeshare interface for multiple users. The system also hosts software production tools for the battery stations and the central system.
Investigations on Absorber Materials at Cryogenic Temperatures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marhauser, Frank; Elliott, Thomas; Rimmer, Robert
2009-05-01
In the framework of the 12 GeV upgrade project for the Continuous Electron Beam Accelerator Facility (CEBAF) improvements are being made to refurbish cryomodules housing Thomas Jefferson National Accelerator Facility's (JLab) original 5-cell cavities. Recently we have started to look into a possible simplification of the existing Higher Order Mode (HOM) absorber design combined with the aim to find alternative material candidates. The absorbers are implemented in two HOM-waveguides immersed in the helium bath and operate at 2 K temperature. We have built a cryogenic setup to perform measurements on sample load materials to investigate their lossy characteristics and variationsmore » from room temperature down to 2 K. Initial results are presented in this paper.« less
2009-04-18
CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister is lifted toward the payload changeout room, or PCR, on the rotating service structure. The red umbilical lines are still attached. The canister's cargo of Hubble Space Telescope equipment will be deposited in the PCR and later transferred to the payload bay on space shuttle Atlantis, at right. Atlantis' 11-day STS-125 mission to service Hubble is targeted for launch May 12. The flight will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014. Photo credit: NASA/Kim Shiflett
Stainless Steel to Titanium Bimetallic Transitions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaluzny, J. A.; Grimm, C.; Passarelli, D.
In order to use stainless steel piping in an LCLS-II (Linac Coherent Light Source Upgrade) cryomodule, stainless steel to titanium bimetallic transitions are needed to connect the stainless steel piping to the titanium cavity helium vessel. Explosion bonded stainless steel to titanium transition pieces and bimetallic transition material samples have been tested. A sample transition tube was subjected to tests and x-ray examinations between tests. Samples of the bonded joint material were impact and tensile tested at room temperature as well as liquid helium temperature. The joint has been used successfully in horizontal tests of LCLS-II cavity helium vessels andmore » is planned to be used in LCLS-II cryomodules. Results of material sample and transition tube tests will be presented.« less
Koivisto, H; Kalvas, T; Tarvainen, O; Komppula, J; Laulainen, J; Kronholm, R; Ranttila, K; Tuunanen, J; Thuillier, T; Xie, D; Machicoane, G
2016-02-01
Several ion source related research and development projects are in progress at the Department of Physics, University of Jyväskylä (JYFL). The work can be divided into investigation of the ion source plasma and development of ion sources, ion beams, and diagnostics. The investigation covers the Electron Cyclotron Resonance Ion Source (ECRIS) plasma instabilities, vacuum ultraviolet (VUV) and visible light emission, photon induced electron emission, and the development of plasma diagnostics. The ion source development covers the work performed for radiofrequency-driven negative ion source, RADIS, beam line upgrade of the JYFL 14 GHz ECRIS, and the development of a new room-temperature-magnet 18 GHz ECRIS, HIISI.
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
Accelerating the Delivery of Home Performance Upgrades through a Synergistic Business Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schirber, Tom; Ojczyk, Cindy
Achieving Building America energy savings goals (40% by 2030) will require many existing homes to install energy upgrades. Engaging large numbers of homeowners in building science-guided upgrades during a single remodeling event has been difficult for a number of reasons. Performance upgrades in existing homes tend to occur over multiple years and usually result from component failures (furnace failure) and weather damage (ice dams, roofing, siding). This research attempted to: A) understand the homeowner's motivations regarding investing in building science based performance upgrades; B) determining a rapidly scalable approach to engage large numbers of homeowners directly through existing customer networks;more » and C) access a business model that will manage all aspects of the contractor-homeowner-performance professional interface to ensure good upgrade decisions over time. The solution results from a synergistic approach utilizing networks of suppliers merging with networks of homeowner customers. Companies in the $400 to $800 billion home services industry have proven direct marketing and sales proficiencies that have led to the development of vast customer networks. Companies such as pest control, lawn care, and security have nurtured these networks by successfully addressing the ongoing needs of homes. This long-term access to customers and trust established with consistent delivery has also provided opportunities for home service providers to grow by successfully introducing new products and services like attic insulation and air sealing. The most important component for success is a business model that will facilitate and manage the process. The team analyzes a group that developed a working model.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Achieving Building America energy savings goals (40 percent by 2030) will require many existing homes to install energy upgrades. Engaging large numbers of homeowners in building science-guided upgrades during a single remodeling event has been difficult for a number of reasons. Performance upgrades in existing homes tend to occur over multiple years and usually result from component failures (furnace failure) and weather damage (ice dams, roofing, siding). This research attempted to: A) Understand the homeowner's motivations regarding investing in building science based performance upgrades. B) Determining a rapidly scalable approach to engage large numbers of homeowners directly through existing customermore » networks. C) Access a business model that will manage all aspects of the contractor-homeowner-performance professional interface to ensure good upgrade decisions over time. The solution results from a synergistic approach utilizing networks of suppliers merging with networks of homeowner customers. Companies in the $400 to $800 billion home services industry have proven direct marketing and sales proficiencies that have led to the development of vast customer networks. Companies such as pest control, lawn care, and security have nurtured these networks by successfully addressing the ongoing needs of homes. This long-term access to customers and trust established with consistent delivery has also provided opportunities for home service providers to grow by successfully introducing new products and services like attic insulation and air sealing. The most important component for success is a business model that will facilitate and manage the process. The team analyzes a group that developed a working model.« less
Main control room, showing original sixpane windows and doors to ...
Main control room, showing original six-pane windows and doors to pump motor room at left. The main control cabinets and switchgear, visible on right, were replaced in 2003. View to the south - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ
VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0, LOOKING WEST. ...
VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0, LOOKING WEST. THESE PANELS WERE WHERE THE A-MOTOR TAPES WOULD HAVE BEEN VISIBLE IN THE CONTROL ROOM. MORE RECENT MONITOR IN UPPER CENTER FOR LTR FLUX MONITORS - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
2014-04-03
CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shimada, M.; Taylor, C. N.; Pawelko, R. J.
2016-04-01
The Tritium Plasma Experiment (TPE) is a unique high-flux linear plasma device that can handle beryllium, tritium, and neutron-irradiated plasma facing materials, and is the only existing device dedicated to directly study tritium retention and permeation in neutron-irradiated materials with tritium [M. Shimada et.al., Rev. Sci. Instru. 82 (2011) 083503 and and M. Shimada, et.al., Nucl. Fusion 55 (2015) 013008]. The plasma-material-interaction (PMI) determines a boundary condition for diffusing tritium into bulk PFCs, and the tritium PMI is crucial for enhancing fundamental sciences that dictate tritium fuel cycles and safety and are high importance to an FNSF and DEMO. Recentlymore » the TPE has undergone major upgrades in its electrical and control systems. New DC power supplies and a new control center enable remote plasma operations from outside of the contamination area for tritium, minimizing the possible exposure risk with tritium and beryllium. We discuss the electrical upgrade, enhanced operational safety, improved plasma performance, and development of optical spectrometer system. This upgrade not only improves operational safety of the worker, but also enhances plasma performance to better simulate extreme plasma-material conditions expected in ITER, Fusion Nuclear Science Facility (FNSF), and Demonstration reactor (DEMO). This work was prepared for the U.S. Department of Energy, Office of Fusion Energy Sciences, under the DOE Idaho Field Office contract number DE-AC07-05ID14517.« less
Upgraded cameras for the HESS imaging atmospheric Cherenkov telescopes
NASA Astrophysics Data System (ADS)
Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gérard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-François; Gräber, Tobias; Hinton, James; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; de Naurois, Mathieu; Nayman, Patrick; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, François
2016-08-01
The High Energy Stereoscopic System (H.E.S.S.) is an array of five imaging atmospheric Cherenkov telescopes, sensitive to cosmic gamma rays of energies between 30 GeV and several tens of TeV. Four of them started operations in 2003 and their photomultiplier tube (PMT) cameras are currently undergoing a major upgrade, with the goals of improving the overall performance of the array and reducing the failure rate of the ageing systems. With the exception of the 960 PMTs, all components inside the camera have been replaced: these include the readout and trigger electronics, the power, ventilation and pneumatic systems and the control and data acquisition software. New designs and technical solutions have been introduced: the readout makes use of the NECTAr analog memory chip, which samples and stores the PMT signals and was developed for the Cherenkov Telescope Array (CTA). The control of all hardware subsystems is carried out by an FPGA coupled to an embedded ARM computer, a modular design which has proven to be very fast and reliable. The new camera software is based on modern C++ libraries such as Apache Thrift, ØMQ and Protocol buffers, offering very good performance, robustness, flexibility and ease of development. The first camera was upgraded in 2015, the other three cameras are foreseen to follow in fall 2016. We describe the design, the performance, the results of the tests and the lessons learned from the first upgraded H.E.S.S. camera.
TCS and peripheral robotization and upgrade on the ESO 1-meter telescope at La Silla Observatory
NASA Astrophysics Data System (ADS)
Ropert, S.; Suc, V.; Jordán, A.; Tala, M.; Liedtke, P.; Royo, S.
2016-07-01
In this work we describe the robotization and upgrade of the ESO 1m telescope located at La Silla Observatory. The ESO 1m telescope was the first telescope installed in La Silla, in 1966. It now hosts as a main instrument the FIber Dual EchellE Optical Spectrograph (FIDEOS), a high resolution spectrograph designed for precise Radial Velocity (RV) measurements on bright stars. In order to meet this project's requirements, the Telescope Control System (TCS) and some of its mechanical peripherals needed to be upgraded. The TCS was also upgraded into a modern and robust software running on a group of single board computers interacting together as a network with the CoolObs TCS developed by ObsTech. One of the particularities of the CoolObs TCS is that it allows to fuse the input signals of 2 encoders per axis in order to achieve high precision and resolution of the tracking with moderate cost encoders. One encoder is installed on axis at the telescope and the other on axis at the motor. The TCS was also integrated with the FIDEOS instrument system so that all the system can be controlled through the same remote user interface. Our modern TCS unit allows the user to run observations remotely through a secured internet web interface, minimizing the need of an on-site observer and opening a new age in robotic astronomy for the ESO 1m telescope.
Front view of bldg 30 which houses mission control
1984-08-30
41D-3072 (30 Aug 1984) --- A 41-D shift change is taking place in the Johnson Space Center's Building 30. In its twenty years of operation, the mission control center has been the scene of many such changes. The windowless wing at left houses three floors, including rooms supporting flight control rooms 1 & 2 (formerly called mission operations control rooms 1 & 2).
VIEW OF CABLES AND TAPES ASSOCIATED WITH ADRIVE CONTROL ROD ...
VIEW OF CABLES AND TAPES ASSOCIATED WITH A-DRIVE CONTROL ROD SYSTEM, AT LEVEL +15, DIRECTLY ABOVE PDP CONTROL ROOM, LOOKING NORTHWEST. THE CABLES FROM THE PDP ROOM GO THROUGH THE CONCRETE WALL, MAKE A RIGHT ANGLE TURN DOWNWARD, AND DESCEND INTO THE PDP CONTROL ROOM AS VERTICAL TAPES - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...
3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID
5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ...
5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ROOM; PASS-THROUGH FOR EXPOSED FILM ON RIGHT - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Measuring Human Performance in Simulated Nuclear Power Plant Control Rooms Using Eye Tracking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kovesdi, Casey Robert; Rice, Brandon Charles; Bower, Gordon Ross
Control room modernization will be an important part of life extension for the existing light water reactor fleet. As part of modernization efforts, personnel will need to gain a full understanding of how control room technologies affect performance of human operators. Recent advances in technology enables the use of eye tracking technology to continuously measure an operator’s eye movement, which correlates with a variety of human performance constructs such as situation awareness and workload. This report describes eye tracking metrics in the context of how they will be used in nuclear power plant control room simulator studies.
Space Station Upgrades Continue on This Week @NASA – March 31, 2017
2017-03-31
Work continues aboard the International Space Station on upgrades to prepare it for future operational activities. Ground controllers, using the station’s robotic arm, moved the Pressurized Mating Adapter-3 (PMA-3) from the Tranquility module to the station’s Harmony module March 26. PMA-3 will be outfitted with one of two International Docking Adapters to accommodate U.S. commercial spacecraft carrying astronauts on future missions. Four days after the PMA-3 move, NASA’s Shane Kimbrough and Peggy Whitson conducted the second in a series of three planned spacewalks to complete work related to the upgrades. The third spacewalk is planned in April. Also, James Webb Space Telescope Completes Acoustic and Vibration Tests, MAVEN Data Helps Measure Loss of Mars’ Atmosphere, Getting Excited About STEM, and New NASA App for Amazon Fire TV!
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Interior of display area (room 101), looking south towards TV ...
Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Quan, Xiaobo; Joseph, Anjali; Ensign, Janet C
2012-01-01
The built environment significantly affects the healthcare experiences of patients and staff. Healthcare administrators and building designers face the opportunity and challenge of improving healthcare experience and satisfaction through better environmental design. The purpose of the study was to evaluate how a novel environmental intervention for imaging rooms, which integrated multiple elements of healing environments including positive distractions and personal control over environment, affects the perceptions and satisfactions of its primary users-patients and staff. Anonymous questionnaire surveys were conducted to compare patient and staff perceptions of the physical environment, satisfaction, and stress in two types of imaging rooms: imaging rooms with the intervention installed (intervention rooms) and traditionally designed rooms without the intervention (comparison rooms). Imaging technologists and patients perceived the intervention rooms to be significantly more pleasant-looking. Patients in the intervention rooms reported significantly higher levels of environmental control and were significantly more willing to recommend the intervention rooms to others. The environmental intervention was effective in improving certain aspects of the imaging environment: pleasantness and environmental control. Further improvement of the imaging environment is needed to address problematic areas such as noise.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy
2009-10-07
The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under theirmore » control. This regulatory development has been accomplished as part of the U.S.-Russian MPC&A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC&A regulations.« less
11. Historic view of Building 100 control room, showing personnel ...
11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas
2006-06-01
One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.
Liquid fuel generation from algal biomass via a two-step process: effect of feedstocks.
Xu, Yu-Ping; Duan, Pei-Gao; Wang, Feng; Guan, Qing-Qing
2018-01-01
In this study, a two-step processing method (hydrothermal liquefaction followed by catalytic upgrading) was used to produce upgraded bio-oil. A comprehensive screening analysis of algal species, including four microalgae and four macroalgae, was conducted to bridge the gap between previous accounts of microalgae and macroalgae hydrothermal liquefaction and the upgrading process of the resulting crude bio-oils. Hydrothermal liquefaction using eight algal biomasses was performed at 350 °C for 1 h. The microalgae always produced a higher crude bio-oil yield than the macroalgae due to their high lipid content, among which Schizochytrium limacinum provided the maximum crude bio-oil yield of 54.42 wt%. For microalgae, higher amounts of N in the biomass resulted in higher amounts of N in the crude bio-oil; however, contrary results were observed for the macroalgae. The crude bio-oils generated from both the microalgae and macroalgae were characterized as having a high viscosity, total acid number, and heteroatom content, and they were influenced by the biochemical compositions of the feedstocks. Next, all eight-crude bio-oils were treated at 400 °C for 2 h with 10 wt% Ru/C using tetralin as the hydrogen donor. The hydrogen source was provided after tetralin was transformed to naphthalene. All the upgraded bio-oils had higher energy densities and significantly lower N, O, and S contents and viscosities than their corresponding crude bio-oils. However, the H/C molar ratio of the upgraded bio-oils decreased due to the absence of external hydrogen relative to the crude bio-oils. The S content of the upgraded bio-oil produced from upgrading the Schizochytrium limacinum crude bio-oil was even close to the 50 ppm requirement of China IV diesel. Microalgae are better feedstocks than macroalgae for liquid fuel production. Biochemical components have a significant impact on the yield and composition of crude bio-oil. Tetralin does not perform as well as external hydrogen for controlling coke formation. The S content of the upgraded bio-oil can be reduced to 76 ppm for the crude bio-oil produced from Schizochytrium limacinum . Upgraded bio-oils have similar properties to those of naphtha and jet fuel.
Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saewert, A. L.; Rapisarda, S. M.; Wendt, M.
2006-11-20
An analog signal pre-processing scheme was developed, in the framework of the Fermilab Main Injector Beam Position Monitor (BPM) Upgrade, to interface BPM pickup signals to the new digital receiver based read-out system. A key component is the 8-channel electronics module, which uses separate frequency-selective gain stages to acquire 53 MHz bunched proton and 2.5 MHz antiproton signals. Related hardware includes a filter and combiner box to sum pickup electrode signals in the tunnel. A controller module allows local/remote control of gain settings and activation of gain stages and supplies test signals. Theory of operation, system overview, and some designmore » details are presented, as well as first beam measurements of the prototype hardware.« less
Initial operation of the NSTX-Upgrade real-time velocity diagnostic
Podestà, M.; Bell, R. E.
2016-11-03
A real-time velocity (RTV) diagnostic based on active charge-exchange recombination spectroscopy is now operational on the National Spherical Torus Experiment-Upgrade (NSTX-U) spherical torus (Menard et al 2012 Nucl. Fusion 52 083015). We designed the system in order to supply plasma velocity data in real time to the NSTX-U plasma control system, as required for the implementation of toroidal rotation control. Our measurements are available from four radii at a maximum sampling frequency of 5 kHz. Post-discharge analysis of RTV data provides additional information on ion temperature, toroidal velocity and density of carbon impurities. Furthermore, examples of physics studies enabled bymore » RTV measurements from initial operations of NSTX-U are discussed.« less
A nonlinear disturbance-decoupled elevation axis controller for the Multiple Mirror Telescope
NASA Astrophysics Data System (ADS)
Clark, Dusty; Trebisky, Tom; Powell, Keith
2008-07-01
The Multiple Mirror Telescope (MMT), upgraded in 2000 to a monolithic 6.5m primary mirror from its original array of six 1.8m primary mirrors, was commissioned with axis controllers designed early in the upgrade process without regard to structural resonances or the possibility of the need for digital filtering of the control axis signal path. Post-commissioning performance issues led us to investigate replacement of the original control system with a more modern digital controller with full control over the system filters and gain paths. This work, from system identification through controller design iteration by simulation, and pre-deployment hardware-in-the-loop testing, was performed using latest-generation tools with Matlab® and Simulink®. Using Simulink's Real Time Workshop toolbox to automatically generate C source code for the controller from the Simulink diagram and a custom target build script, we were able to deploy the new controller into our existing software infrastructure running Wind River's VxWorks™real-time operating system. This paper describes the process of the controller design, including system identification data collection, with discussion of implementation of non-linear control modes and disturbance decoupling, which became necessary to obtain acceptable wind buffeting rejection.
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Current status of Japanese detectors
NASA Astrophysics Data System (ADS)
Tatsumi, Daisuke; Takahashi, Ryutaro; Arai, Koji; Nakagawa, Noriyasu; Agatsuma, Kazuhiro; Yamazaki, Toshitaka; Fukushima, Mitsuhiro; Fujimoto, Masa-Katsu; Takamori, Akiteru; Bertolini, Alessandro; Sannibale, Virginio; DeSalvo, Riccardo; Márka, Szabolcs; Ando, Masaki; Tsubono, Kimio; Akutsu, Tomomi; Yamamoto, Kazuhiro; Ishitsuka, Hideki; Uchiyama, Takashi; Miyoki, Shinji; Ohashi, Masatake; Kuroda, Kazuaki; Awaya, Norichika; Kanda, Nobuyuki; Araya, Akito; Telada, Souichi; Tomaru, Takayuki; Haruyama, Tomiyoshi; Yamamoto, Akira; Sato, Nobuaki; Suzuki, Toshitaka; Shintomi, Takakazu
2007-10-01
The current status of the TAMA and CLIO detectors in Japan is reported in this paper. These two interferometric gravitational wave detectors are being developed for the large cryogenic gravitational wave telescope (LCGT) which is a future plan for detecting gravitational wave signals at least once per year. TAMA300 is being upgraded to improve the sensitivity in a low-frequency region after the last observational experiment in 2004. To reduce the seismic noises, we are installing a new seismic isolation system, called the TAMA seismic attenuation system, for the four test masses. We confirmed stable mass locks of a cavity and improvements of length and angular fluctuations by using two SASs. We are currently optimizing the performance of the third and fourth SASs. We continue TAMA300 operation and R&D studies for the LCGT. The next data taking is planned for the summer of 2007. CLIO is a 100 m baseline length prototype detector for LCGT to investigate interferometer performance in cryogenic condition. The key features of CLIO are that it locates the Kamioka underground site for a low-seismic noise level, and adopts cryogenic Sapphire mirrors for low-thermal noise level. The first operation of the cryogenic interferometer was successfully demonstrated in February 2006. Current sensitivity at room temperature is close to the target sensitivity within a factor of 4. Several observational experiments at room temperature have been done. Once the displacement noise reaches the thermal noise level of room temperature, its improvement by cooling test mass mirrors should be demonstrated.
Test Capability Enhancements to the NASA Langley 8-Foot High Temperature Tunnel
NASA Technical Reports Server (NTRS)
Harvin, S. F.; Cabell, K. F.; Gallimore, S. D.; Mekkes, G. L.
2006-01-01
The NASA Langley 8-Foot High Temperature Tunnel produces true enthalpy environments simulating flight from Mach 4 to Mach 7, primarily for airbreathing propulsion and aerothermal/thermo-structural testing. Flow conditions are achieved through a methane-air heater and nozzles producing aerodynamic Mach numbers of 4, 5 or 7 and have exit diameters of 8 feet or 4.5 feet. The 12-ft long free-jet test section, housed inside a 26-ft vacuum sphere, accommodates large test articles. Recently, the facility underwent significant upgrades to support hydrocarbon fueled scramjet engine testing and to expand flight simulation capability. The upgrades were required to meet engine system development and flight clearance verification requirements originally defined by the joint NASA-Air Force X-43C Hypersonic Flight Demonstrator Project and now the Air Force X-51A Program. Enhancements to the 8-Ft. HTT were made in four areas: 1) hydrocarbon fuel delivery; 2) flight simulation capability; 3) controls and communication; and 4) data acquisition/processing. The upgrades include the addition of systems to supply ethylene and liquid JP-7 to test articles; a Mach 5 nozzle with dynamic pressure simulation capability up to 3200 psf, the addition of a real-time model angle-of-attack system; a new programmable logic controller sub-system to improve process controls and communication with model controls; the addition of MIL-STD-1553B and high speed data acquisition systems and a classified data processing environment. These additions represent a significant increase to the already unique test capability and flexibility of the facility, and complement the existing array of test support hardware such as a model injection system, radiant heaters, six-component force measurement system, and optical flow field visualization hardware. The new systems support complex test programs that require sophisticated test sequences and precise management of process fluids. Furthermore, the new systems, such as the real-time angle of attack system and the new programmable logic controller enhance the test efficiency of the facility. The motivation for the upgrades and the expanded capabilities is described here.
29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...
29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA
28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...
28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA
Karásek, Pavel; Hohnová, Barbora; Planeta, Josef; Št'avíková, Lenka; Roth, Michal
2013-02-01
Increasing production and disposal of organic light-emitting diode (OLED) displays for smartphones and tablets may have impact on the environment depending on the aqueous solubility of the pertinent chemicals. Here, aqueous solubilities are presented for several compounds, mostly aromatic amines, used as hole transport materials in the OLED displays. Solute selection includes 1,4-bis(diphenylamino)benzene, tetra-N-phenylbenzidine, 4,4'-bis(N-carbazolyl)-1,1'-biphenyl, 1,3,5-tris(diphenylamino)benzene, and 9,10-bis(phenylethynyl)anthracene. The solubilities are those in pressurized hot water (PHW), i.e., measured at elevated temperature (up to 260 °C) and pressure. The semi-quantitative estimates of room-temperature solubilities of the solutes have been obtained from extrapolations of the solubilities in PHW. For the compounds studied, the estimated aqueous solubilities at room temperature do not exceed 2×10(-11) g of the solute per 1 kg of water. Aqueous solubilities of triphenylamine have also been measured and used to upgrade a recent group-contribution model of aqueous solubilities of organic nonelectrolytes with the parameters for the nitrogen atom in aromatic amines. Copyright © 2012 Elsevier Ltd. All rights reserved.
West wall, display area (room 101), view 1 of 4: ...
West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade
NASA Astrophysics Data System (ADS)
Bongers, W. A.; Kasparek, W.; Doelman, N.; van den Braber, R.; van den Brand, H.; Meo, F.; de Baar, M. R.; Amerongen, F. J.; Donné, A. J. H.; Elzendoorn, B. S. Q.; Erckmann, V.; Goede, A. P. H.; Giannone, L.; Grünwald, G.; Hollman, F.; Kaas, G.; Krijger, B.; Michel, G.; Lubyako, L.; Monaco, F.; Noke, F.; Petelin, M.; Plaum, B.; Purps, F.; ten Pierik, J. G. W.; Schüller, C.; Slob, J. W.; Stober, J. K.; Schütz, H.; Wagner, D.; Westerhof, E.; Ronden, D. M. S.
2012-09-01
A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.
Governing time in operating rooms.
Riley, Robin; Manias, Elizabeth
2006-05-01
This paper examines how time is controlled and governed in operating rooms through interpersonal communication between nurses and doctors. Time is a valuable commodity in organizations with improvements often directed towards maximizing efficiencies. As a consequence, time can be a source of tension and interpersonal conflict as individuals compete for control of its use. The data in this paper emanate from an ethnographic study that explored a range of communication practices in operating room nursing. Participants comprised 11 operating room nurses. Data were collected over two years in three different institutional settings and involved participant observation, interviews and the keeping of a personal diary. A deconstructive analysis of the data was undertaken. Results are discussed in terms of the practices, in which clinicians are engaged in, to govern and control their use of time. The four practices presented in this paper include; questioning judgment and timing, controlling speed, estimating surgeons' use of time and coping with different perceptions of time. Time and speed were hotly contested by nurses. They used their personal knowledge of individual surgeon's habits of time to govern and control practice. Nurses thought about surgeons in terms of time and developed commonly accepted understandings about the length of surgical procedures. They used this knowledge to manage the scheduling of operations in the departments and to control the workflow in individual operating rooms. Knowledge of individual surgeons was a source of power for operating room nurses. Nurses have more power in the operating room than might be imagined but they exercise this power in subtle ways. If operating rooms are to work effectively, the operating room team must understand each others' work better.
Promoting Hand Hygiene With a Lighting Prompt.
Diegel-Vacek, Lauren; Ryan, Catherine
2016-10-01
The objective of this pilot study was to assess an automatic sink light design intervention as a prompt for clinician hand hygiene (as defined by World Health Organization [WHO]). Healthcare-associated infections (HAIs) are still leading causes of morbidity and mortality and contribute to burdens on our healthcare system. Hand hygiene has been related to reducing the rate of HAIs and positively impacting both patient and hospital outcomes. This pilot study was a prospective, longitudinal observational study of a convenience sample of healthcare clinicians. In one inpatient room, clinicians were exposed to a hand hygiene reminder that consisted of a light turning on over the sink as they entered. A control room (the adjacent inpatient room) did not have the intervention. A total of 88 clinician encounters were monitored during the study. On the first observation day at the initial activation of the signal light system, the percentage of clinicians performing hand hygiene upon entering a room was only 7% in the control room and 23% in the intervention room. During the second observation (Day 14), those percentages were 16% in the control room and 30% in the intervention room. During the third observation (Day 21), those percentages were 23% in the control room and 23% in the intervention room. The healthcare system frequently relies on expensive technology to improve healthcare delivery, but implementation of low-cost, low-technology methods such as this light may be effective in prompting hand hygiene. © The Author(s) 2016.
Space Shuttle Upgrades Advanced Hydraulic Power System
NASA Technical Reports Server (NTRS)
2004-01-01
Three Auxiliary Power Units (APU) on the Space Shuttle Orbiter each provide 145 hp shaft power to a hydraulic pump which outputs 3000 psi hydraulic fluid to 41 hydraulic actuators. A hydrazine fuel powered APU utilized throughout the Shuttle program has undergone many improvements, but concerns remain with flight safety, operational cost, critical failure modes, and hydrazine related hazards. The advanced hydraulic power system (AHPS), also known as the electric APU, is being evaluated as an upgrade to replace the hydrazine APU. The AHPS replaces the high-speed turbine and hydrazine fuel supply system with a battery power supply and electric motor/pump that converts 300 volt electrical power to 3000 psi hydraulic power. AHPS upgrade benefits include elimination of toxic hydrazine propellant to improve flight safety, reduction in hazardous ground processing operations, and improved reliability. Development of this upgrade provides many interesting challenges and includes development of four hardware elements that comprise the AHPS system: Battery - The battery provides a high voltage supply of power using lithium ion cells. This is a large battery that must provide 28 kilowatt hours of energy over 99 minutes of operation at 300 volts with a peak power of 130 kilowatts for three seconds. High Voltage Power Distribution and Control (PD&C) - The PD&C distributes electric power from the battery to the EHDU. This 300 volt system includes wiring and components necessary to distribute power and provide fault current protection. Electro-Hydraulic Drive Unit (EHDU) - The EHDU converts electric input power to hydraulic output power. The EHDU must provide over 90 kilowatts of stable, output hydraulic power at 3000 psi with high efficiency and rapid response time. Cooling System - The cooling system provides thermal control of the Orbiter hydraulic fluid and EHDU electronic components. Symposium presentation will provide an overview of the AHPS upgrade, descriptions of the four hardware elements, and a summary of development results to date.
The Fermilab Accelerator control system
NASA Astrophysics Data System (ADS)
Bogert, Dixon
1986-06-01
With the advent of the Tevatron, considerable upgrades have been made to the controls of all the Fermilab Accelerators. The current system is based on making as large an amount of data as possible available to many operators or end-users. Specifically there are about 100 000 separate readings, settings, and status and control registers in the various machines, all of which can be accessed by seventeen consoles, some in the Main Control Room and others distributed throughout the complex. A "Host" computer network of approximately eighteen PDP-11/34's, seven PDP-11/44's, and three VAX-11/785's supports a distributed data acquisition system including Lockheed MAC-16's left from the original Main Ring and Booster instrumentation and upwards of 1000 Z80, Z8002, and M68000 microprocessors in dozens of configurations. Interaction of the various parts of the system is via a central data base stored on the disk of one of the VAXes. The primary computer-hardware communication is via CAMAC for the new Tevatron and Antiproton Source; certain subsystems, among them vacuum, refrigeration, and quench protection, reside in the distributed microprocessors and communicate via GAS, an in-house protocol. An important hardware feature is an accurate clock system making a large number of encoded "events" in the accelerator supercycle available for both hardware modules and computers. System software features include the ability to save the current state of the machine or any subsystem and later restore it or compare it with the state at another time, a general logging facility to keep track of specific variables over long periods of time, detection of "exception conditions" and the posting of alarms, and a central filesharing capability in which files on VAX disks are available for access by any of the "Host" processors.
Design of the thermal insulating test system for doors and windows of buildings
NASA Astrophysics Data System (ADS)
Yu, Yan; Qi, Jinqing; Xu, Yunwei; Wu, Hao; Ou, Jinping
2011-04-01
Thermal insulating properties of doors and widows are important parameter to measure the quality of windows and doors. This paper develops the thermal insulating test system of doors and windows for large temperature difference in winter in north of China according to national standards. This system is integrated with temperature measurement subsystem, temperature control subsystem, the heating power measurement subsystem, and heat transfer coefficient calculated subsystem. The temperature measurement subsystem includes temperature sensor which is implemented by sixty-four thermocouple sensors to measure the key positions of cold room and hot room, and the temperature acquisition unit which adopts Agilent 34901A data acquisition card to achieve self-compensation and accurate temperature capture. The temperature control subsystem including temperature controller and compressor system is used to control the temperature between 0 degree to 20 degree for hot room and -20 degree to 0 degree for cold room. The hot room controller uses fuzzy control algorithm to achieve accurate control of temperature and the cold room controller firstly uses compressor to achieve coarse control and then uses more accurate temperature controller unit to obtain constant temperature(-20 degree). The heating power measurement is mainly to get the heat power of hot room heating devices. After above constant temperature environment is constructed, software of the test system is developed. Using software, temperature data and heat power data can be accurately got and then the heat transfer coefficient, representing the thermal insulating properties of doors and widows, is calculated using the standard formula. Experimental results show that the test system is simple, reliable and precise. It meets the testing requirements of national standard and has a good application prospect.
Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade
NASA Astrophysics Data System (ADS)
Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.
2009-04-01
The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
ERIC Educational Resources Information Center
Soenens, Bart; Vansteenkiste, Maarten
2010-01-01
Psychological control refers to manipulative parental behavior that intrudes upon the child's psychological world. During the past decade, socialization research has consistently demonstrated the negative effects of psychologically controlling parenting on children's and adolescents' development. However, there has been relatively little advance…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
... process of upgrading their accounting systems and internal controls and hiring additional staff to meet... thereunder, that require registered companies to devise and maintain a system of internal accounting controls... company's risk management processes and system of internal control. A listed company may choose to...
Upgraded metallurgical-grade silicon solar cells with efficiency above 20%
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zheng, P.; Rougieux, F. E.; Samundsett, C.
We present solar cells fabricated with n-type Czochralski–silicon wafers grown with strongly compensated 100% upgraded metallurgical-grade feedstock, with efficiencies above 20%. The cells have a passivated boron-diffused front surface, and a rear locally phosphorus-diffused structure fabricated using an etch-back process. The local heavy phosphorus diffusion on the rear helps to maintain a high bulk lifetime in the substrates via phosphorus gettering, whilst also reducing recombination under the rear-side metal contacts. The independently measured results yield a peak efficiency of 20.9% for the best upgraded metallurgical-grade silicon cell and 21.9% for a control device made with electronic-grade float-zone silicon. The presencemore » of boron-oxygen related defects in the cells is also investigated, and we confirm that these defects can be partially deactivated permanently by annealing under illumination.« less
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...
83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
10. Credit BG. Interior of control and observation room at ...
10. Credit BG. Interior of control and observation room at Control and Recording Center Building 4221/E-22. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Cong; Evans, Tabitha J.; Cheng, Lei
2015-10-02
These catalytic C–C coupling and deoxygenation reactions are essential for upgrading of biomass-derived oxygenates to fuel-range hydrocarbons. Detailed understanding of mechanistic and energetic aspects of these reactions is crucial to enabling and improving the catalytic upgrading of small oxygenates to useful chemicals and fuels. Using periodic density functional theory (DFT) calculations, we have investigated the reactions of furan and acetaldehyde in an HZSM-5 zeolite catalyst, a representative system associated with the catalytic upgrading of pyrolysis vapors. Comprehensive energy profiles were computed for self-reactions (i.e., acetaldehyde coupling and furan coupling) and cross-reactions (i.e., acetaldehyde + furan) of this representative mixture. Majormore » products proposed from the computations are further confirmed using temperature controlled mass spectra measurements. Moreover, the computational results show that furan interacts with acetaldehyde in HZSM-5 via an alkylation mechanism, which is more favorable than the self-reactions, indicating that mixing furans with aldehydes could be a promising approach to maximize effective C–C coupling and dehydration while reducing the catalyst deactivation (e.g., coke formation) from aldehyde condensation.« less
Nuclear reactor control room construction
Lamuro, R.C.; Orr, R.
1993-11-16
A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures.
Nuclear reactor control room construction
Lamuro, Robert C.; Orr, Richard
1993-01-01
A control room 10 for a nuclear plant is disclosed. In the control room, objects 12, 20, 22, 26, 30 are no less than four inches from walls 10.2. A ceiling 32 contains cooling fins 35 that extend downwards toward the floor from metal plates 34. A concrete slab 33 is poured over the plates. Studs 36 are welded to the plates and are encased in the concrete.
17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON ...
17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON LEFT, SIGNAL CONTROLS ON RIGHT, WHISTLE PULL TOP. RADIO TELEPHONE IN CENTER BACK (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
2009-09-25
CAPE CANAVERAL, Fla. – This ribbon cutting officially turns over NASA Kennedy Space Center's Launch Control Center Firing Room 1 from the Space Shuttle Program to the Constellation Program. Participating are (from left) Pepper Phillips, director of the Constellation Project Office at Kennedy; Bob Cabana, Kennedy's director; Robert Crippen, former astronaut; Jeff Hanley, manager of the Constellation Program at NASA's Johnson Space Center; and Nancy Bray, deputy director of Center Operations at Kennedy. The room has undergone demolition and construction and been outfitted with consoles for the upcoming Ares I-X rocket flight test targeted for launch on Oct. 27. As the center of launch operations at Kennedy since the Apollo Program, the Launch Control Center, or LCC, has played a central role in NASA's human spaceflight programs. Firing Room 1 was the first operational firing room constructed. From this room, controllers launched the first Saturn V, the first crewed flight of Saturn V, the first crewed mission to the moon and the first space shuttle. Firing Room 1 will continue this tradition of firsts when controllers launch the Constellation Program's first flight test. Also, this firing room will be the center of operations for the upcoming Ares I and Orion operations. Photo credit: NASA/Kim Shiflett
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Photographic art in exam rooms may reduce white coat hypertension.
Harper, Michael B; Kanayama-Trivedi, Stacy; Caldito, Gloria; Montgomery, David; Mayeaux, E J; DelRosso, Lourdes M
2015-12-01
Blood pressure (BP) elevation in medical office settings in patients who are normotensive in nonmedical settings is an effect known as 'white coat hypertension'. This phenomenon is thought to be due to situational anxiety caused by the experience of visiting a doctor and the anxiety-inducing nature of the medical office. Our study was designed to determine if carefully selected photographic art could counter the anxiety that causes white coat hypertension and lead to lower BP recordings in some patients. 117 adults, non-pregnant patients from the Louisiana State University Health Sciences Center Family Medicine Resident Clinic participated in this study. After the triage nurse measured the BP, the patients were randomly placed in either an exam room with standard medical posters (control room) or in an exam room with photographic art (photo room). The BP was measured in the exam room. After the medical visit, the patients switched rooms and the BP was measured a third time. The patients were asked to fill out a questionnaire to identify room preference. On average, the BP obtained in the control rooms was higher than that obtained in the photo rooms. There was a statistically significant difference between the mean arterial pressure, systolic BP and diastolic BP between the control room and the photo room. Landscape photographic art may have the beneficial effect of reducing BP in medical office examination rooms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
Ferrite HOM Absorber for the RHIC ERL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hahn,H.; Choi, E.M.; Hammons, L.
A superconducting Energy Recovery Linac is under construction at Brookhaven National Laboratory to serve as test bed for RHIC upgrades. The damping of higher-order modes in the superconducting five-cell cavity for the Energy-Recovery linac at RHIC is performed exclusively by two ferrite absorbers. The ferrite properties have been measured in ferrite-loaded pill box cavities resulting in the permeability values given by a first-order Debye model for the tiled absorber structure and an equivalent permeability value for computer simulations with solid ring dampers. Measured and simulated results for the higher-order modes in the prototype copper cavity are discussed. First room-temperature measurementsmore » of the finished niobium cavity are presented which confirm the effective damping of higher-order modes in the ERL. by the ferrite absorbers.« less
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1988-01-01
Deep Space Network and Systems topics addressed include: tracking and ground-base navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; and network upgrading and sustaining.
Analog signal pre-processing for the Fermilab Main Injector BPM upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saewert, A.L.; Rapisarda, S.M.; Wendt, M.
2006-05-01
An analog signal pre-processing scheme was developed, in the framework of the Fermilab Main Injector Beam Position Monitor (BPM) Upgrade, to interface BPM pickup signals to the new digital receiver based read-out system. A key component is the 8-channel electronics module, which uses separate frequency selective gain stages to acquire 53 MHz bunched proton, and 2.5 MHz anti-proton signals. Related hardware includes a filter and combiner box to sum pickup electrode signals in the tunnel. A controller module allows local/remote control of gain settings and activation of gain stages, and supplies test signals. Theory of operation, system overview, and somemore » design details are presented, as well as first beam measurements of the prototype hardware.« less
Measure Guideline. Steam System Balancing and Tuning for Multifamily Residential Buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choi, Jayne; Ludwig, Peter; Brand, Larry
2013-04-01
This guideline provides building owners, professionals involved in multifamily audits, and contractors insights for improving the balance and tuning of steam systems. It provides readers an overview of one-pipe steam heating systems, guidelines for evaluating steam systems, typical costs and savings, and guidelines for ensuring quality installations. It also directs readers to additional resources for details not included here. Measures for balancing a distribution system that are covered include replacing main line vents and upgrading radiator vents. Also included is a discussion on upgrading boiler controls and the importance of tuning the settings on new or existing boiler controls. Themore » guideline focuses on one-pipe steam systems, though many of the assessment methods can be generalized to two-pipe steam systems.« less
Sjöstrand, Henrik; Andersson Sundén, E; Conroy, S; Ericsson, G; Gatu Johnson, M; Giacomelli, L; Gorini, G; Hellesen, C; Hjalmarsson, A; Popovichev, S; Ronchi, E; Tardocchi, M; Weiszflog, M
2009-06-01
Burning plasma experiments such as ITER and DEMO require diagnostics capable of withstanding the harsh environment generated by the intense neutron flux and to maintain stable operating conditions for times longer than present day systems. For these reasons, advanced control and monitoring (CM) systems will be necessary for the reliable operation of diagnostics. This paper describes the CM system of the upgraded magnetic proton recoil neutron spectrometer installed at the Joint European Torus focusing in particular on a technique for the stabilization of the gain of the photomultipliers coupled to the neutron detectors. The results presented here show that this technique provides good results over long time scales. The technique is of general interest for all diagnostics that employ scintillators coupled to photomultiplier tubes.
Simulation Control Graphical User Interface Logging Report
NASA Technical Reports Server (NTRS)
Hewling, Karl B., Jr.
2012-01-01
One of the many tasks of my project was to revise the code of the Simulation Control Graphical User Interface (SIM GUI) to enable logging functionality to a file. I was also tasked with developing a script that directed the startup and initialization flow of the various LCS software components. This makes sure that a software component will not spin up until all the appropriate dependencies have been configured properly. Also I was able to assist hardware modelers in verifying the configuration of models after they have been upgraded to a new software version. I developed some code that analyzes the MDL files to determine if any error were generated due to the upgrade process. Another one of the projects assigned to me was supporting the End-to-End Hardware/Software Daily Tag-up meeting.
Microprocessor tester for the treat upgrade reactor trip system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenkszus, F.R.; Bucher, R.G.
1984-01-01
The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. In addition, a programmable Automated Reactor Control System (ARCS) will permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety systemmore » is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations.« less
Reliable and redundant FPGA based read-out design in the ATLAS TileCal Demonstrator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Akerstedt, Henrik; Muschter, Steffen; Drake, Gary
The Tile Calorimeter at ATLAS [1] is a hadron calorimeter based on steel plates and scintillating tiles read out by PMTs. The current read-out system uses standard ADCs and custom ASICs to digitize and temporarily store the data on the detector. However, only a subset of the data is actually read out to the counting room. The on-detector electronics will be replaced around 2023. To achieve the required reliability the upgraded system will be highly redundant. Here the ASICs will be replaced with Kintex-7 FPGAs from Xilinx. This, in addition to the use of multiple 10 Gbps optical read-out links,more » will allow a full read-out of all detector data. Due to the higher radiation levels expected when the beam luminosity is increased, opportunities for repairs will be less frequent. The circuitry and firmware must therefore be designed for sufficiently high reliability using redundancy and radiation tolerant components. Within a year, a hybrid demonstrator including the new readout system will be installed in one slice of the ATLAS Tile Calorimeter. This will allow the proposed upgrade to be thoroughly evaluated well before the planned 2023 deployment in all slices, especially with regard to long term reliability. Different firmware strategies alongside with their integration in the demonstrator are presented in the context of high reliability protection against hardware malfunction and radiation induced errors.« less
CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...
CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA
Early experience with influenza A H1N109 in an Australian intensive care unit.
Leen, Tim; Williams, Teresa A; Campbell, Lorraine; Chamberlain, Jenny; Gould, Andree; McEntaggart, Geraldine; Leslie, Gavin D
2010-08-01
Influenza is a common seasonal viral infection that affects large numbers of people. In early 2009, many people were admitted to hospitals in Mexico with severe respiratory failure following an influenza-like illness, subtyped as H1N1. An increased mortality rate was observed. By June 2009, H1N1 was upgraded to pandemic status. In June-July, Australian ICUs were experiencing increased activity due to the influenza pandemic. While hospitals implemented plans for the pandemic, the particularly heavy demand to provide critical care facilities to accommodate an influx of people with severe respiratory failure became evident and placed a great burden on provision of these services. This paper describes the initial experience (June to mid September) of the pandemic from the nursing perspective in a single Australian ICU. Patients were noted to be younger with a higher proportion of women, two of whom were pregnant. Two patients had APACHE III comorbidity. Of the 31 patients admitted during this period, three patients died in ICU and one patient died in hospital. Aerosol precautions were initiated for all patients. The requirement for single room accommodation placed enormous demands for bed management in ICU. Specific infection control procedures were developed to deal with this new pandemic influenza. Copyright 2010 Elsevier Ltd. All rights reserved.
Solar Thermal Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biesinger, K; Cuppett, D; Dyer, D
2012-01-30
HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With themore » use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.« less
NASA Astrophysics Data System (ADS)
Wehner, William; Schuster, Eugenio; Poli, Francesca
2016-10-01
Initial progress towards the design of non-inductive current ramp-up scenarios in the National Spherical Torus Experiment Upgrade (NSTX-U) has been made through the use of TRANSP predictive simulations. The strategy involves, first, ramping the plasma current with high harmonic fast waves (HHFW) to about 400 kA, and then further ramping to 900 kA with neutral beam injection (NBI). However, the early ramping of neutral beams and application of HHFW leads to an undesirably peaked current profile making the plasma unstable to ballooning modes. We present an optimization-based control approach to improve on the non-inductive ramp-up strategy. We combine the TRANSP code with an optimization algorithm based on sequential quadratic programming to search for time evolutions of the NBI powers, the HHFW powers, and the line averaged density that define an open-loop actuator strategy that maximizes the non-inductive current while satisfying constraints associated with the current profile evolution for MHD stable plasmas. This technique has the potential of playing a critical role in achieving robustly stable non-inductive ramp-up, which will ultimately be necessary to demonstrate applicability of the spherical torus concept to larger devices without sufficient room for a central coil. Supported by the US DOE under the SCGSR Program.
Measure Guideline: Combustion Safety for Natural Draft Appliances Using Indoor Air
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brand, L.
2014-04-01
This measure guideline covers how to assess and carry out the combustion safety procedures for appliances and heating equipment that uses indoor air for combustion in low-rise residential buildings. Only appliances installed in the living space, or in an area freely communicating with the living space, vented alone or in tandem with another appliance are considered here. A separate measure guideline addresses combustion appliances located either within the living space in enclosed closets or side rooms or outside the living space in an adjacent area like an attic or garage that use outdoor air for combustion. This document is formore » inspectors, auditors, and technicians working in homes where energy upgrades are being conducted whether or not air infiltration control is included in the package of measures being applied. In the indoor combustion air case, guidelines summarized here are based on language provided in several of the codes to establish minimum requirements for the space using simplified prescriptive measures. In addition, building performance testing procedures are provided by testing agencies. The codes in combination with the test procedures offer comprehensive combustion safety coverage to address safety concerns, allowing inexperienced residential energy retrofit inspectors to effectively address combustion safety issues and allow energy retrofits to proceed.« less
Combustion Safety for Appliances Using Indoor Air (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-05-01
This measure guideline covers how to assess and carry out the combustion safety procedures for appliances and heating equipment that uses indoor air for combustion in low-rise residential buildings. Only appliances installed in the living space, or in an area freely communicating with the living space, vented alone or in tandem with another appliance are considered here. A separate measure guideline addresses combustion appliances located either within the living space in enclosed closets or side rooms or outside the living space in an adjacent area like an attic or garage that use outdoor air for combustion. This document is formore » inspectors, auditors, and technicians working in homes where energy upgrades are being conducted whether or not air infiltration control is included in the package of measures being applied. In the indoor combustion air case, guidelines summarized here are based on language provided in several of the codes to establish minimum requirements for the space using simplified prescriptive measures. In addition, building performance testing procedures are provided by testing agencies. The codes in combination with the test procedures offer comprehensive combustion safety coverage to address safety concerns, allowing inexperienced residential energy retrofit inspectors to effectively address combustion safety issues and allow energy retrofits to proceed.« less
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...
TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED ...
13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED BEHIND MANAGER'S ART DECO-STYLE CONTROL DESK, WITH CONTROL CUBICLE 1 AT FAR RIGHT AND CONTROL CUBICLE 9 AT FAR LEFT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA
11. Credit BG. Interior of control and observation room at ...
11. Credit BG. Interior of control and observation room at Control and Recording Center, showing detail of switchboard and closed circuit television monitors. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA
5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL ...
5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL HOUSE LOCATED ON THE SOUTH END OF BIG TUJUNGA DAM SHOWING THE CONTROL PANEL. - Big Tujunga Dam, Control House, 809 West Big Tujunga Road, Sunland, Los Angeles County, CA
Requirements for VICTORIA Class Fire Control System: Contact Management Function
2014-07-01
Canadian Navy ( RCN ) is currently upgrading the fire control system, which will include moving the software to new modular consoles which have screens...Development RCN Royal Canadian Navy SAC Sensor Analysis Coordinator; also called Command Display Console (CDC) operator SAR Search and Rescue SME
Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial.
Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh
2015-05-01
One of the strategies for a good outcome and pain free childbearing is to design the delivery room. The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants' intervention vs. 66% of control participants had perinea laceration (P = 0.041). According to the findings of the present study, distracting senses in snoezelen room decreases mother's pain intensity, the length of labor, and incidence of episiotomy.
Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial
Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh
2015-01-01
Background: One of the strategies for a good outcome and pain free childbearing is to design the delivery room. Objectives: The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. Patients and Methods: This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. Results: The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants’ intervention vs. 66% of control participants had perinea laceration (P = 0.041). Conclusions: According to the findings of the present study, distracting senses in snoezelen room decreases mother’s pain intensity, the length of labor, and incidence of episiotomy. PMID:26082849
A simulator-based nuclear reactor emergency response training exercise.
Waller, Edward; Bereznai, George; Shaw, John; Chaput, Joseph; Lafortune, Jean-Francois
Training offsite emergency response personnel basic awareness of onsite control room operations during nuclear power plant emergency conditions was the primary objective of a week-long workshop conducted on a CANDU® virtual nuclear reactor simulator available at the University of Ontario Institute of Technology, Oshawa, Canada. The workshop was designed to examine both normal and abnormal reactor operating conditions, and to observe the conditions in the control room that may have impact on the subsequent offsite emergency response. The workshop was attended by participants from a number of countries encompassing diverse job functions related to nuclear emergency response. Objectives of the workshop were to provide opportunities for participants to act in the roles of control room personnel under different reactor operating scenarios, providing a unique experience for participants to interact with the simulator in real-time, and providing increased awareness of control room operations during accident conditions. The ability to "pause" the simulator during exercises allowed the instructors to evaluate and critique the performance of participants, and to provide context with respect to potential offsite emergency actions. Feedback from the participants highlighted (i) advantages of observing and participating "hands-on" with operational exercises, (ii) their general unfamiliarity with control room operational procedures and arrangements prior to the workshop, (iii) awareness of the vast quantity of detailed control room procedures for both normal and transient conditions, and (iv) appreciation of the increased workload for the operators in the control room during a transient from normal operations. Based upon participant feedback, it was determined that the objectives of the training had been met, and that future workshops should be conducted.
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
50 CFR 600.1002 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... moratorium on new entrants, restrictions on vessel upgrades, and other effort control measures, taking into account the full potential fishing capacity of the fleet; (2) Establish a specified or target total...
12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. ...
12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING NORTH - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING EAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
IET control building (TAN620). control room. facing north. control consoles ...
IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... determined that, because Kansas is a Group 2 SO 2 state, EPA could not demonstrate that these controls would... adjusted downward as a result of combustion control (e.g., LNB) upgrades or installation that would be... of what other similarly-configured units are achieving when installing such controls. Therefore, the...
Utilization of the High Flux Isotope Reactor at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Selby, Douglas L; Bilheux, Hassina Z; Meilleur, Flora
2015-01-01
This paper addresses several aspects of the scientific utilization of the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR). Topics to be covered will include: 1) HFIR neutron scattering instruments and the formal instrument user program; 2) Recent upgrades to the neutron scattering instrument stations at the reactor, and 3) eMod a new tool for addressing instrument modifications and providing configuration control and design process for scientific instruments at HFIR and the Spallation Neutron Source (SNS). There are 15 operating neutron instrument stations at HFIR with 12 of them organized into a formal user program. Since the last presentationmore » on HFIR instruments at IGORR we have installed a Single Crystal Quasi-Laue Diffractometer instrument called IMAGINE; and we have made significant upgrades to HFIR neutron scattering instruments including the Cold Triple Axis Instrument, the Wide Angle Neutron Diffractometer, the Powder Diffractometer, and the Neutron Imaging station. In addition, we have initiated upgrades to the Thermal Triple Axis Instrument and the Bio-SANS cold neutron instrument detector system. All of these upgrades are tied to a continuous effort to maintain a high level neutron scattering user program at the HFIR. For the purpose of tracking modifications such as those mentioned and configuration control we have been developing an electronic system for entering instrument modification requests that follows a modification or instrument project through concept development, design, fabrication, installation, and commissioning. This system, which we call eMod, electronically leads the task leader through a series of questions and checklists that then identifies such things as ES&H and radiological issues and then automatically designates specific individuals for the activity review process. The system has been in use for less than a year and we are still working out some of the inefficiencies, but we believe that this will become a very effective tool for achieving the configuration and process control believed to be necessary for scientific instrument systems.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borole, A P
The recovery and conversion of heavy oils is limited due to the high viscosity of these crudes and their high heteroatom content. Conventional technology relies on thermochemical hydrogenation and hydrodesulfurization to address these problems and is energy intensive due to the high operating temperature and pressure. This project was initiated to explore biological catalysts for adding hydrogen to the heavy oil molecules. Biological enzymes are efficient at hydrogen splitting at very mild conditions such as room temperature and pressure, however, they are very specific in terms of the substrates they hydrogenate. The goal of the project was to investigate howmore » the specificity of these enzymes can be altered to develop catalysts for oil upgrading. Three approaches were used. First was to perform chemical modification of the enzyme surface to improve binding of other non-natural substrates. Second approach was to expose the deeply buried catalytic active site of the enzyme by removal of protein scaffolding to enable better interaction with other substrates. The third approach was based on molecular biology to develop genetically engineered systems for enabling targeted structural changes in the enzyme. The first approach was found to be limited in success due to the non-specificity of the chemical modification and inability to target the region near the active site or the site of substrate binding. The second approach produced a smaller catalyst capable of catalyzing hydrogen splitting, however, further experimentation is needed to address reproducibility and stability issues. The third approach which targeted cloning of hydrogenase in alternate hosts demonstrated progress, although further work is necessary to complete the cloning process. The complex nature of the hydrogenase enzyme structure-function relationship and role of various ligands in the protein require significant more research to better understand the enzyme and to enable success in strategies in developing catalysts with broader specificity as that required for crude upgrading.« less
Working Group 5: Measurements technology and active experiments
NASA Technical Reports Server (NTRS)
Whipple, E.; Barfield, J. N.; Faelthammar, C.-G.; Feynman, J.; Quinn, J. N.; Roberts, W.; Stone, N.; Taylor, W. L.
1986-01-01
Technology issues identified by working groups 5 are listed. (1) New instruments are needed to upgrade the ability to measure plasma properties in space. (2) Facilities should be developed for conducting a broad range of plasma experiments in space. (3) The ability to predict plasma weather within magnetospheres should be improved and a capability to modify plasma weather developed. (4) Methods of control of plasma spacecraft and spacecraft plasma interference should be upgraded. (5) The space station laboratory facilities should be designed with attention to problems of flexibility to allow for future growth. These issues are discussed.
NASA Astrophysics Data System (ADS)
Petros, Mulugeta; Refaat, Tamer F.; Singh, Upendra N.; Yu, Jirong; Antill, Charles; Remus, Ruben; Taylor, Bryant D.; Wong, Teh-Hwa; Reithmaier, Karl; Lee, Jane; Ismail, Syed; Davis, Kenneth J.
2018-04-01
An advanced airborne triple-pulse 2-μm integrated path differential absorption (IPDA) lidar is under development at NASA Langley Research Center that targets both carbon dioxide (CO2) and water vapor (H2O) measurements simultaneously and independently. This lidar is an upgrade to the successfully demonstrated CO2 2-μm double-pulse IPDA. Upgrades include high-energy, highrepetition rate 2-μm triple-pulse laser transmitter, innovative wavelength control and advanced HgCdTe (MCT) electron-initiated avalanche photodiode detection system. Ground testing and airborne validation plans are presented.
LHC Status and Upgrade Challenges
NASA Astrophysics Data System (ADS)
Smith, Jeffrey
2009-11-01
The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... written control room management procedures that implement the requirements of this section. The procedures... define the roles and responsibilities of a controller during normal, abnormal, and emergency operating... operator must define each of the following: (1) A controller's authority and responsibility to make...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1987-01-01
Topics addressed include: tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; network upgrade and sustaining; mission interface and support; and Ka-band capabilities.
Guided to gather: toy plane upgraded with telemetry
Wiese, Vanessa; Wiese, Dana
2006-01-01
GPS/INS and infrared optical sensors propel USGS's transformation of a remote-controlled one-quarter scale recreational aircraft into a low-cost unmanned aerial vehicle designed for environmental particulate collection.
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
Boyer, M. D.; Battaglia, D. J.; Mueller, D.; ...
2018-01-25
Here, the upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgradedmore » to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.« less
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyer, M. D.; Battaglia, D. J.; Mueller, D.
Here, the upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgradedmore » to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.« less
An intervention for noise control of blast furnace in steel industry.
Golmohammadi, Rostam; Giahi, Omid; Aliabadi, Mohsen; Darvishi, Ebrahim
2014-01-01
Noise pollution is currently a major health risk factor for workers in industries. The aim of this study was to investigate noise pollution and implement a control intervention plan for blast furnace in a steel industry. The measurement of sound pressure level (SPL) along with frequency analysis was done with the sound-level-meter Cell-450. Personal noise exposure was performed using dosimeter TES-1345 calibrated with CEL-282. Before planning noise controls, acoustic insulation properties of the furnace control unit and workers' rest room were assessed. Control room and workers' rest room were redesigned in order to improve acoustical condition. The SPL before intervention around the Blast Furnace was 90.3 dB (L) and its dominant frequency was 4000 Hz. Besides, noise transmission loss of the control and rest rooms were 10.3 dB and 4.2 dB, respectively. After intervention, noise reduction rates in the control and rest rooms were 27.4 dB and 27.7 dB, respectively. The workers' noise dose before and after the intervention was 240% and less than 100%, respectively. Improvement the workroom acoustic conditions through noise insulation can be considered effective method for preventing workers exposure to harmful noise.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dagle, J.E.
1992-09-01
The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less
D0 Solenoid Upgrade Project: Pressure Ratings for Some Chimney and Control Dewar Componenets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rucinski, R.; /Fermilab
1993-05-25
Pressure rating calculations were done for some of the chimney and control dewar components. This engineering note documents these calculations. The table below summarizes the components looked at, and what pressure rating are. The raw engineering calculations for each of the components is given.
27. Pump Room interiorDrainage pump motor control center with main ...
27. Pump Room interior-Drainage pump motor control center with main valve control panel at right. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA
31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL ...
31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL ...
30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
Front view of bldg 30 which houses mission control
NASA Technical Reports Server (NTRS)
1984-01-01
Front view of bldg 30 which houses mission control. A shift change for the 41-D mission is underway. The windowless wing at left houses three floors, including rooms supporting flight control room 1 and 2.
11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...
11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...
12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, T. M.; Wilke, R. J.; Roberts, T.
Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building. The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference. Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test. The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, T. M.; Wilke, R. J.; Roberts, T.
Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building.The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference.Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test.The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less
49. Environmental equipment room, cbr filter at left, ventilation control ...
49. Environmental equipment room, cbr filter at left, ventilation control panel in center, brine chiller controls at right, looking southeast - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
Documentation of new mission control center White Flight Control Room (FLCR)
1995-06-06
Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).
An integrated system for dynamic control of auditory perspective in a multichannel sound field
NASA Astrophysics Data System (ADS)
Corey, Jason Andrew
An integrated system providing dynamic control of sound source azimuth, distance and proximity to a room boundary within a simulated acoustic space is proposed for use in multichannel music and film sound production. The system has been investigated, implemented, and psychoacoustically tested within the ITU-R BS.775 recommended five-channel (3/2) loudspeaker layout. The work brings together physical and perceptual models of room simulation to allow dynamic placement of virtual sound sources at any location of a simulated space within the horizontal plane. The control system incorporates a number of modules including simulated room modes, "fuzzy" sources, and tracking early reflections, whose parameters are dynamically changed according to sound source location within the simulated space. The control functions of the basic elements, derived from theories of perception of a source in a real room, have been carefully tuned to provide efficient, effective, and intuitive control of a sound source's perceived location. Seven formal listening tests were conducted to evaluate the effectiveness of the algorithm design choices. The tests evaluated: (1) loudness calibration of multichannel sound images; (2) the effectiveness of distance control; (3) the resolution of distance control provided by the system; (4) the effectiveness of the proposed system when compared to a commercially available multichannel room simulation system in terms of control of source distance and proximity to a room boundary; (5) the role of tracking early reflection patterns on the perception of sound source distance; (6) the role of tracking early reflection patterns on the perception of lateral phantom images. The listening tests confirm the effectiveness of the system for control of perceived sound source distance, proximity to room boundaries, and azimuth, through fine, dynamic adjustment of parameters according to source location. All of the parameters are grouped and controlled together to create a perceptually strong impression of source location and movement within a simulated space.
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along ...
11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along west wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND ...
29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND VIEWING WINDOW IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...
8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
User and Performance Impacts from Franklin Upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
He, Yun
2009-05-10
The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.
LOFT. Interior, control room in control building (TAN630). Camera facing ...
LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA
Recent developments for the upgrade of the LHCb readout system
NASA Astrophysics Data System (ADS)
Cachemiche, J. P.; Y Duval, P.; Hachon, F.; Le Gac, R.; Réthoré, F.
2013-02-01
The upgraded LHCb readout system aims at a trigger-free readout of the entire detector at the bunch-crossing rate. This implies a major architectural change for the readout system that must capture the data at 40 MHz instead of 1 MHz. One of the key components of this upgrade system is the readout board. The LHCb collaboration has chosen to evaluate the ATCA architecture as form-factor for the readout board. The readout system architecture relies on a unique board able to satisfy all the requirements for data transmission, timing and fast control as well as experiment control system. A generic ATCA carrier board has been developped. It is equipped with four dense AMC mezzanines able to interface a total of 144 bidirectional optical links at up to 10 Gbits/s. This board embeds 4 high end Stratix V GX devices for data processing and a programmable set of commutation functions allowing to reconfigure the connectivity of the system in a flexible way. The overall architecture will be presented and how the cards map over each functionality. First results and measurements will be described in particular those related to the use of new highly integrated optical devices. At last we will present the incremental development methodology used in this project.
Lowe, Gary R; Griffin, Yolanda; Hart, Michael D
2014-08-01
Modern electronic health record systems (EHRS) reportedly offer advantages including improved quality, error prevention, cost reduction, and increased efficiency. This project reviewed the impact on specimen turnaround times (TAT) and percent compliance for specimens processed in a STAT laboratory after implementation of an upgraded EHRS. Before EHRS implementation, laboratory personnel received instruction and training for specimen processing. One laboratory member per shift received additional training. TAT and percent compliance data sampling occurred 4 times monthly for 13 months post-conversion and were compared with the mean of data collected for 3 months pre-conversion. Percent compliance was gauged using a benchmark of reporting 95% of all specimens within 7 min from receipt. Control charts were constructed for TAT and percent compliance with control limits set at 2 SD and applied continuously through the data collection period. TAT recovered to pre-conversion levels by the 6th month post-conversion. Percent compliance consistently returned to pre-conversion levels by the 10th month post-conversion. Statistical analyses revealed the TAT were significantly longer for 3 months post-conversion (P < .001) compared with pre-conversion levels. Statistical significance was not observed for subsequent groups. Percent compliance results were significantly lower for 6 months post-conversion (P < .001). Statistical significance was not observed for subsequent groups. Extensive efforts were made to train and prepare personnel for challenges expected after the EHRS upgrade. Specific causes identified with the upgraded EHRS included multiple issues involving personnel and the EHRS. These data suggest that system and user issues contributed to delays in returning to pre-conversion TAT and percent compliance levels following the upgrade in the EHRS.
NASA Astrophysics Data System (ADS)
Grujicic, M.; Ramaswami, S.; Snipes, J. S.; Yavari, R.; Yen, C.-F.; Cheeseman, B. A.
2015-01-01
Our recently developed multi-physics computational model for the conventional gas metal arc welding (GMAW) joining process has been upgraded with respect to its predictive capabilities regarding the process optimization for the attainment of maximum ballistic limit within the weld. The original model consists of six modules, each dedicated to handling a specific aspect of the GMAW process, i.e., (a) electro-dynamics of the welding gun; (b) radiation-/convection-controlled heat transfer from the electric arc to the workpiece and mass transfer from the filler metal consumable electrode to the weld; (c) prediction of the temporal evolution and the spatial distribution of thermal and mechanical fields within the weld region during the GMAW joining process; (d) the resulting temporal evolution and spatial distribution of the material microstructure throughout the weld region; (e) spatial distribution of the as-welded material mechanical properties; and (f) spatial distribution of the material ballistic limit. In the present work, the model is upgraded through the introduction of the seventh module in recognition of the fact that identification of the optimum GMAW process parameters relative to the attainment of the maximum ballistic limit within the weld region entails the use of advanced optimization and statistical sensitivity analysis methods and tools. The upgraded GMAW process model is next applied to the case of butt welding of MIL A46100 (a prototypical high-hardness armor-grade martensitic steel) workpieces using filler metal electrodes made of the same material. The predictions of the upgraded GMAW process model pertaining to the spatial distribution of the material microstructure and ballistic limit-controlling mechanical properties within the MIL A46100 butt weld are found to be consistent with general expectations and prior observations.
Robonaut 2 on the International Space Station: Status Update and Preparations for IVA Mobility
NASA Technical Reports Server (NTRS)
Ahlstrom, Thomas D.; Diftler, Myron E.; Berka, Reginald B.; Badger, Julia M.; Yayathi, Sandeep; Curtis, Andrew W.; Joyce, Charles A.
2013-01-01
Robotics engineers, ground controllers and International Space Station (ISS) crew have been running successful experiments using Robonaut 2 (R2) on-board the ISS for more than a year. This humanoid upper body robot continues to expand its list of achievements and its capabilities to safely demonstrate maintenance and servicing tasks while working alongside human crewmembers. The next phase of the ISS R2 project will transition from a stationary Intra Vehicular Activity (IVA) upper body using a power/data umbilical, to an IVA mobile system with legs for repositioning, a battery backpack power supply, and wireless communications. These upgrades will enable the R2 team to evaluate hardware performance and to develop additional control algorithms and control verification techniques with R2 inside the ISS in preparation for the Extra Vehicular Activity (EVA) phase of R2 operations. As R2 becomes more capable in assisting with maintenance tasks, with minimal supervision, including repositioning itself to different work sites, the ISS crew will be burdened with fewer maintenance chores, leaving them more time to conduct other activities. R2's developers at the Johnson Space Center (JSC) are preparing the R2 IVA mobility hardware and software upgrades for delivery to the ISS in late 2013. This paper summarizes R2 ISS achievements to date, briefly describes the R2 IVA mobility upgrades, and discusses the R2 IVA mobility objectives and plans.
Information Foraging in Nuclear Power Plant Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
R.L. Boring
2011-09-01
nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators tomore » appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.« less
NASA Astrophysics Data System (ADS)
Mahavarkar, Prasanna; John, Jacob; Dhapre, Vijay; Dongre, Varun; Labde, Sachin
2018-04-01
A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia), was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG) in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.
6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape ...
6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape tunnel. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner ...
7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner and entrance to cable tunnel. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
Wide angle view of the Flight control room of Mission control center
1984-10-06
Wide angle view of the flight control room (FCR) of the Mission Control Center (MCC). Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.
Gauthier, Philippe-Aubert; Berry, Alain; Woszczyk, Wieslaw
2005-02-01
This paper describes the simulations and results obtained when applying optimal control to progressive sound-field reproduction (mainly for audio applications) over an area using multiple monopole loudspeakers. The model simulates a reproduction system that operates either in free field or in a closed space approaching a typical listening room, and is based on optimal control in the frequency domain. This rather simple approach is chosen for the purpose of physical investigation, especially in terms of sensing microphones and reproduction loudspeakers configurations. Other issues of interest concern the comparison with wave-field synthesis and the control mechanisms. The results suggest that in-room reproduction of sound field using active control can be achieved with a residual normalized squared error significantly lower than open-loop wave-field synthesis in the same situation. Active reproduction techniques have the advantage of automatically compensating for the room's natural dynamics. For the considered cases, the simulations show that optimal control results are not sensitive (in terms of reproduction error) to wall absorption in the reproduction room. A special surrounding configuration of sensors is introduced for a sensor-free listening area in free field.
Upgrading in an Industrial Setting. Final Report.
ERIC Educational Resources Information Center
Russell, Wendell
The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…
Microcontroller based automatic temperature control for oyster mushroom plants
NASA Astrophysics Data System (ADS)
Sihombing, P.; Astuti, T. P.; Herriyance; Sitompul, D.
2018-03-01
In the cultivation of Oyster Mushrooms need special treatment because oyster mushrooms are susceptible to disease. Mushroom growth will be inhibited if the temperature and humidity are not well controlled because temperature and inertia can affect mold growth. Oyster mushroom growth usually will be optimal at temperatures around 22-28°C and humidity around 70-90%. This problem is often encountered in the cultivation of oyster mushrooms. Therefore it is very important to control the temperature and humidity of the room of oyster mushroom cultivation. In this paper, we developed an automatic temperature monitoring tool in the cultivation of oyster mushroom-based Arduino Uno microcontroller. We have designed a tool that will control the temperature and humidity automatically by Android Smartphone. If the temperature increased more than 28°C in the room of mushroom plants, then this tool will turn on the pump automatically to run water in order to lower the room temperature. And if the room temperature of mushroom plants below of 22°C, then the light will be turned on in order to heat the room. Thus the temperature in the room oyster mushrooms will remain stable so that the growth of oyster mushrooms can grow with good quality.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhao, Y.; Edwards, R.M.; Lee, K.Y.
1997-03-01
In this paper, a simplified model with a lower order is first developed for a nuclear steam generator system and verified against some realistic environments. Based on this simplified model, a hybrid multi-input and multi-out (MIMO) control system, consisting of feedforward control (FFC) and feedback control (FBC), is designed for wide range conditions by using the genetic algorithm (GA) technique. The FFC control, obtained by the GA optimization method, injects an a priori command input into the system to achieve an optimal performance for the designed system, while the GA-based FBC control provides the necessary compensation for any disturbances ormore » uncertainties in a real steam generator. The FBC control is an optimal design of a PI-based control system which would be more acceptable for industrial practices and power plant control system upgrades. The designed hybrid MIMO FFC/FBC control system is first applied to the simplified model and then to a more complicated model with a higher order which is used as a substitute of the real system to test the efficacy of the designed control system. Results from computer simulations show that the designed GA-based hybrid MIMO FFC/FBC control can achieve good responses and robust performances. Hence, it can be considered as a viable alternative to the current control system upgrade.« less
Estrada, José M; Kraakman, N J R; Lebrero, R; Muñoz, R
2015-11-01
Traditional physical/chemical end-of-the-pipe technologies for odor abatement are relatively expensive and present high environmental impacts. On the other hand, biotechnologies have recently emerged as cost-effective and environmentally friendly alternatives but are still limited by their investment costs and land requirements. A more desirable approach to odor control is the prevention of odorant formation before being released to the atmosphere, but limited information is available beyond good design and operational practices of the wastewater treatment process. The present paper reviews two widely applicable and economic alternatives for odor control, Activated Sludge Recycling (ASR) and Oxidized Ammonium Recycling (OAR), by discussing their fundamentals, key operating parameters and experience from the available pilot and field studies. Both technologies present high application potential using readily available plant by-products with a minimum plant upgrading, and low investment and operating costs, contributing to the sustainability and economic efficiency of odor control at wastewater treatment facilities. Copyright © 2015 Elsevier Ltd. All rights reserved.
Upgrades to MINERVA control software
NASA Astrophysics Data System (ADS)
Wilson, Maurice; Eastman, Jason D.
2017-01-01
The MINiature Exoplanet Radial Velocity Array (MINERVA) is an array of four robotic telescopes located on Mt. Hopkins in Arizona that will find and characterize rocky planets around our nearest stars. We discuss the latest upgrades to the MINERVA robotic control software. Previously, our robotic control software was only capable of taking radial velocities or photometry for the entire night, but not both. We have recently increased the speed and ease of transitioning between photometry and radial velocity (RV) observations. We can now arbitrarily assign a subset of the telescopes to either photometric or spectroscopic observations. This capability enables us to monitor stellar activity while measuring the star’s RV, gather photometry on one star while continuing our RV survey of other targets and provide education and public outreach opportunities where others can observe with one or more telescopes while we continue using the remaining telescopes for research. This material is based upon work supported by the National Science Foundation Graduate Research Fellowship Program under Grant No. 1144152.
LANDSAT-4 MSS Geometric Correction: Methods and Results
NASA Technical Reports Server (NTRS)
Brooks, J.; Kimmer, E.; Su, J.
1984-01-01
An automated image registration system such as that developed for LANDSAT-4 can produce all of the information needed to verify and calibrate the software and to evaluate system performance. The on-line MSS archive generation process which upgrades systematic correction data to geodetic correction data is described as well as the control point library build subsystem which generates control point chips and support data for on-line upgrade of correction data. The system performance was evaluated for both temporal and geodetic registration. For temporal registration, 90% errors were computed to be .36 IFOV (instantaneous field of view) = 82.7 meters) cross track, and .29 IFOV along track. Also, for actual production runs monitored, the 90% errors were .29 IFOV cross track and .25 IFOV along track. The system specification is .3 IFOV, 90% of the time, both cross and along track. For geodetic registration performance, the model bias was measured by designating control points in the geodetically corrected imagery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bachner, Katherine M.; Mladineo, Stephen V.
The NNSA Material Protection, Control, and Accounting (MPC&A) program has been engaged for fifteen years in upgrading the security of nuclear materials in Russia. Part of the effort has been to establish the conditions necessary to ensure the long-term sustainability of nuclear security. A sustainable program of nuclear security requires the creation of an indigenous infrastructure, starting with sustained high level government commitment. This includes organizational development, training, maintenance, regulations, inspections, and a strong nuclear security culture. The provision of modern physical protection, control, and accounting equipment to the Russian Federation alone is not sufficient. Comprehensive infrastructure projects support themore » Russian Federation's ability to maintain the risk reduction achieved through upgrades to the equipment. To illustrate the contributions to security, and challenges of implementation, this paper discusses the history and next steps for an indigenous Tamper Indication Device (TID) program, and a Radiation Portal Monitoring (RPM) program.« less
A new telescope control system for the Telescopio Nazionale Galileo: I - derotators
NASA Astrophysics Data System (ADS)
Ghedina, Adriano; Gonzalez, Manuel; Perez Ventura, Hector; Carmona, Candido; Riverol, Luis
2014-07-01
Telescopio Nazionale Galileo (TNG) is a 4m class active optics telescope at the observatory of Roque de Los Muchachos. In the framework of keeping optimum performances during observation and continuous reliability the telescope control system (TCS) of the TNG is going through a deep upgrade after nearly 20 years of service. The original glass encoders and bulb lamp heads are substituted with modern steel scale drums and scanning units. The obsolete electronic racks and computers for the control loops are replaced with modern and compact commercial drivers with a net improvement in the tracking error RMS. In order to minimize the impact on the number of nights lost during the mechanical and electronic changes in the TCS the new TCS is developed and tested in parallel to the existing one and three steps will be taken to achieve the full upgrade. We describe here the first step affecting the mechanical derotators at the Nasmyth foci.
A new telescope control system for the Telescopio Nazionale Galileo II: azimuth and elevation axes
NASA Astrophysics Data System (ADS)
Ghedina, Adriano; Gonzalez, Manuel; Pérez Ventura, Héctor; Riverol Rodríguez, A. Luis
2016-07-01
TNG is a 4m class active optics telescope at the Observatory of Roque de Los Muchachos. In the framework of keeping optimum performances during observation and continuous reliability the telescope control system (TCS) of the TNG is going through a deep upgrade after nearly 20 years of service. The original glass encoders and bulb lamp heads are substituted with modern steel scale drums and scanning units. The obsolete electronic racks and computers for the control loops are replaced with modern and compact commercial drivers with a net improvement in the motors torque ripple. In order to minimize the impact on the number of nights lost during the mechanical and electronic changes in the TCS the new TCS is developed and tested in parallel to the existing one and three steps will be taken to achieve the full upgrade. We describe here the second step that affected the main axes of the telescope, AZ and EL.
Check Calibration of the NASA Glenn 10- by 10-Foot Supersonic Wind Tunnel (2014 Test Entry)
NASA Technical Reports Server (NTRS)
Johnson, Aaron; Pastor-Barsi, Christine; Arrington, E. Allen
2016-01-01
A check calibration of the 10- by 10-Foot Supersonic Wind Tunnel (SWT) was conducted in May/June 2014 using an array of five supersonic wedge probes to verify the 1999 Calibration. This check calibration was necessary following a control systems upgrade and an integrated systems test (IST). This check calibration was required to verify the tunnel flow quality was unchanged by the control systems upgrade prior to the next test customer beginning their test entry. The previous check calibration of the tunnel occurred in 2007, prior to the Mars Science Laboratory test program. Secondary objectives of this test entry included the validation of the new Cobra data acquisition system (DAS) against the current Escort DAS and the creation of statistical process control (SPC) charts through the collection of series of repeated test points at certain predetermined tunnel parameters. The SPC charts secondary objective was not completed due to schedule constraints. It is hoped that this effort will be readdressed and completed in the near future.
Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Herrmann, A.; Greuner, H.; Fuchs, J. C.; de Marné, P.; Neu, R.; ASDEX Upgrade Team
2009-12-01
ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N2-seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.
Fermilab Tevatron and Pbar source status report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, H.
1986-08-01
The antiproton production cycle is enumerated, and the commissioning of the antiproton source is described, giving milestones and major obstacles. The Tevatron collider operation is described, including procedure to load the Tevatron with three bunches of protons and three bunches of antiprotons. Commissioning of the Main Ring and Tevatron for collider operation is described. Development and accelerator studies in four areas were necessary: main ring RF manipulations; controls and applications software support; Tevatron storage and low-beta squeeze sequence; and study of various beam transfers, storage steps, and sequences. Final tests are described. A long range upgrade program is presently undermore » evaluation to accomplish these goals: luminosity increase to 5 x 10/sup 31/ cm/sup -2/sec/sup -1/, production rates up to 4 x 10/sup 11/ antiprotons/hr, and intensity increase for fixed target operation. Beam quality is to be improved by the injector and main ring upgrades, and the luminosity goal is addressed by the Collider upgrade. (LEW)« less
The upgrade system of BESIII ETOF with MRPC technology
NASA Astrophysics Data System (ADS)
Wang, X. Z.; Sun, Y. J.; Li, C.; Heng, Y. K.; Wu, Z.; Cao, P.; Dai, H. L.; Ji, X. L.; Gong, W. X.; Liu, Z.; Luo, X. L.; Sun, W. J.; Wang, S. Y.; Wang, Y.; Yang, R. X.; Ye, M.; Zhao, J. L.
2016-08-01
An upgrade, based on Multigap Resistive Plate Chamber (MRPC) technology, of the endcap Time-Of-Flight (ETOF) detector of the Beijing Spectrometer III (BESIII) has been proposed for the replacement of the current scintillator + PMT based ETOF, with the aim of improving the time resolution down to 80 ps sigma. This improvement will enhance the particle identification capability to meet the higher precision requirements of physics. The ETOF system including MRPC modules, Front End Electronics (FEE), CLOCK module, fast control boards and Time to Digital modules (TDIG), has been designed, constructed and parts of the ETOF system have seperately tested. Aiming at examining the quality of entire ETOF system and training the operation of all participated instruments, a cosmic ray test system was built and tested in the laboratory for about three months to guarantee the performance. In this paper the results of the test are presented indicating that the entire ETOF system works well and satisfies the requirements of the upgrade.
The payloads of Advanced Virgo: current status and upgrades
NASA Astrophysics Data System (ADS)
Naticchioni, L.; Virgo Collaboration
2018-02-01
The development and integration of new detector payloads has been an important part of the Advanced Virgo (AdV) project, the major upgrade of the Virgo interferometric detector of Gravitational Waves, aiming to increase the detector sensitivity by one order of magnitude. During the integration phase of the new AdV payloads with monolithic suspension of mirrors we experienced systematic suspension failures later identified as caused by dust contamination of the vacuum system. In order to not postpone the detector commissioning, making possible to join the LIGO O2 observation run, the Collaboration decided to proceed with the integration of the payloads relying on steel wire suspensions for all the mirrors. In this proceeding the status of the currently integrated payloads is reported, including their angular control characterization and the Q-factor measurements for test mass steel wire suspensions. The payload upgrade for the re-integration of monolithic suspensions after the O2 run is reported in the last section.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, M.; Gunter, B.
1991-09-01
In response to a request from a representative of the Raymond W. Bliss Army Community Hospital concerning indoor air quality at Greely Hall, Fort Huachuca (SIC-9711), Arizona, an environmental and ventilation survey was conducted. Greely Hall was a three story, multipurpose building with approximately 120,000 feet per floor. The building housed primarily offices, but also had a cafeteria, auditorium, computer rooms, conference rooms and electronics maintenance area. Over 2100 persons worked in the building. Average carbon-dioxide (124389) levels were 584 parts per million (ppm) in the morning, increasing to 1040ppm for the last measurements made that day. The levels rangedmore » from 350 to 1000ppm in the morning to 800 to 1800ppm in the afternoon. Inordinate temperature increases during the day were found in some areas of the building. Many of the air handling units had inoperable or closed main outside air dampers. Maintenance was poor. Improperly maintained or poorly draining condesate pans, renovation of the building without upgrading the ventilation systems and insufficient maintenance personnel were some of the problems identified. The authors conclude that the potential for thermal comfort problems and microbial contamination existed. The authors recommend measures to remedy these situations.« less
STS-109 Flight Control Room Photo
2002-03-05
JSC2002-00575 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.
STS-109 Flight Control Room Photo
2002-03-05
JSC2002-00576 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.
Real Time Control of the SSC String Magnets
NASA Astrophysics Data System (ADS)
Calvo, O.; Flora, R.; MacPherson, M.
1987-08-01
The system described in this paper, called SECAR, was designed to control the excitation of a test string of magnets for the proposed Superconducting Super Collider (SSC) and will be used to upgrade the present Tevatron Excitation, Control and Regulation (TECAR) hardware and software . It resides in a VME crate and is controlled by a 68020/68881 based CPU running the application software under a real time operating system named VRTX.
Real time control of the SSC string magnets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Calvo, O.; Flora, R.; MacPherson, M.
1987-08-01
The system described in this paper, called SECAR, was designed to control the excitation of a test string of magnets for the proposed Superconducting Super Collider (SSC) and will be used to upgrade the present Tevatron Excitation, Control and Regulation (TECAR) hardware and software. It resides in a VME orate and is controlled by a 68020/68881 based CPU running the application software under a real time operating system named VRTX.
The Impact of New Electronic Imaging Systems on U.S. Air Force Visual Information Professionals.
1993-06-01
modernizing the functions left in their control. This process started by converting combat camera assets from 16mm film to Betacam "camcorder’ systems. Combat...upgraded to computer-controlled editing with 1-inch helical machines or component-video Betacam equipment. For the base visual information centers, new
Upgrading NASA/DOSE laser ranging system control computers
NASA Technical Reports Server (NTRS)
Ricklefs, Randall L.; Cheek, Jack; Seery, Paul J.; Emenheiser, Kenneth S.; Hanrahan, William P., III; Mcgarry, Jan F.
1993-01-01
Laser ranging systems now managed by the NASA Dynamics of the Solid Earth (DOSE) and operated by the Bendix Field Engineering Corporation, the University of Hawaii, and the University of Texas have produced a wealth on interdisciplinary scientific data over the last three decades. Despite upgrades to the most of the ranging station subsystems, the control computers remain a mix of 1970's vintage minicomputers. These encompass a wide range of vendors, operating systems, and languages, making hardware and software support increasingly difficult. Current technology allows replacement of controller computers at a relatively low cost while maintaining excellent processing power and a friendly operating environment. The new controller systems are now being designed using IBM-PC-compatible 80486-based microcomputers, a real-time Unix operating system (LynxOS), and X-windows/Motif IB, and serial interfaces have been chosen. This design supports minimizing short and long term costs by relying on proven standards for both hardware and software components. Currently, the project is in the design and prototyping stage with the first systems targeted for production in mid-1993.
Suppression of Rn-daughters in the DarkSide Dark Matter Search
NASA Astrophysics Data System (ADS)
Cao, Huajie; Borexino; DarkSide Collaboration
2011-04-01
Alpha-emitting activity from radon daughters will be an important source of background for the next generation of direct dark matter searches. A vacuum swing adsorption (VSA) system with a radon suppression factor better than 100 was constructed and operated to purify the make-up air to the clean room that was used for the construction of the Borexino nylon vessels. The system was recently refurbished and upgraded for use in the construction and assembly of the DarkSide-50 dark matter detector. The VSA system consists of two charcoal-filled tanks cycled between atmospheric pressure and 10 mbar. I will discuss the design and operation of the system and detail its performance. Results from this test may inform the development of radon filters dedicated to support the next generation of dark matter and double beta decay detectors.
2009-05-11
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, Steven Hoyle, left, and Russ Brucker, center, receive a VIP award for their efforts associated with the STS-125 mission and NASA's Hubble Space Telescope. Hoyle is the payload test operations manager with NASA's Goddard Space Flight Center; Brucker is the Atlantis payload project manager with United Space Alliance. A crew of seven launched today on space shuttle Atlantis to service Hubble. Liftoff was on time at 2:01 p.m. EDT. Atlantis' 11-day flight will include five spacewalks to refurbish and upgrade the telescope with state-of-the-art science instruments that will expand Hubble's capabilities and extend its operational lifespan through at least 2014. The payload includes a Wide Field Camera 3, fine guidance sensor and the Cosmic Origins Spectrograph. Photo credit: NASA/Kim Shiflett
26. A typical outer rod room, or rack room, showing ...
26. A typical outer rod room, or rack room, showing the racks for the nine horizontal control rods (HCRs) that would be inserted or withdrawn from the pile to control the rate of reaction. In this case, it is the 105-F Reactor in February 1945. The view is looking away from the pile, which is out of the picture on the left. Several of the cooling water hose reels for the rods can be seen at the end of the racks near the wall. D-8323 - B Reactor, Richland, Benton County, WA
Closed-Loop Acoustic Control of Reverberant Room for Satellite Environmental Testing
NASA Astrophysics Data System (ADS)
Janssens, Karl; Bianciardi, Fabio; Sabbatini, Danilo; Debille, Jan; Carrella, Alex
2012-07-01
The full satellite acoustic test is an important milestone in a satellite launch survivability verification campaign. This test is required to verify the satellite’s mechanical design against the high-level acoustic loads induced by the launch vehicle during the atmospheric flight. During the test, the satellite is subjected to a broadband diffuse acoustic field, reproducing the pressure levels observed during launch. The excitation is in most cases provided by a combination of horns for the low frequencies and noise generators for the higher frequencies. Acoustic control tests are commonly performed in reverberant rooms, controlling the sound pressure levels in third octave bands over the specified target spectrum. This paper discusses an automatic feedback control system for acoustic control of large reverberation rooms for satellite environmental testing. The acoustic control system consists of parallel third octave PI (Proportional Integral) feedback controllers that take the reverberation characteristics of the room into consideration. The drive output of the control system is shaped at every control step based on the comparison of the average third octave noise spectrum, measured from a number of microphones in the test room, with the target spectrum. Cross-over filters split the output drive into band- limited signals to feed each of the horns. The control system is realized in several steps. In the first phase, a dynamic process model is developed, including the non-linear characteristics of the horns and the reverberant properties of the room. The model is identified from dynamic experiments using system identification techniques. In the next phase, an adequate control strategy is designed which is capable of reaching the target spectrum in the required time period without overshoots. This control strategy is obtained from model-in-the-loop (MIL) simulations, evaluating the performance of various potential strategies. Finally, the proposed strategy is implemented in real-time and its control performance tested and validated.
Clean room survey and assessment, volume 5, appendix H
NASA Technical Reports Server (NTRS)
1991-01-01
The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.
Time Synchronization Prototype, Server Upgrade Procedure Support and Remote Software Development
NASA Technical Reports Server (NTRS)
Sanders, Shania R.
2014-01-01
Networks are roadways of communication that connect devices. Like all roadways, there are rules and regulations that govern whatever (information in this case) travels along them. One type of rule that is commonly used is called a protocol. More specifically, a protocol is a standard that specifies how data should be transmitted over a network. The project outlined in this document seeks to implement one protocol in particular, Precision Time Protocol, within the Kennedy Ground Control Subsystem network at Kennedy Space Center. This document also summarizes work completed for server upgrades, remote software developer training and how all three assignments demonstrated the importance of accountability and security.
Quality control and batch testing of MRPC modules for BESIII ETOF upgrade
NASA Astrophysics Data System (ADS)
Liu, Z.; Li, X.; Sun, Y. J.; Li, C.; Heng, Y. K.; Chen, T. X.; Dai, H. L.; Shao, M.; Sun, S. S.; Tang, Z. B.; Yang, R. X.; Wu, Z.; Wang, X. Z.
2017-12-01
The end-cap time-of-flight (ETOF) system for the Beijing Spectrometer III (BESIII) has been upgraded using the Multi-gap Resistive Plate Chamber (MRPC) technology (Williams et al., 1999; Li et al., 2001; Blanco et al., 2003; Fonte et al., 2013, [1-4]). A set of quality-assurance procedures has been developed to guarantee the performances of the 72 mass-produced MRPC modules installed. The cosmic ray batch testing show that the average detection efficiency of the MRPC modules is about 95%. Two different calibration methods indicate that MRPCs' time resolution can reach 60 ps in the cosmic ray test.
NASA Technical Reports Server (NTRS)
Dyer, Edward F.
1992-01-01
In view of the serious performance deficiencies inherent in conventional modular and welded shielding EMC test enclosures, in which multipath reflections and resonant standing waves can damage flight hardware during RF susceptibility tests, NASA-Goddard has undertaken the modification of a 20 x 24 ft modular-shielded enclosure through installation of steel panels to which ferrite tiles will be mounted with epoxy. The internally reflected RF energy will thereby be absorbed, and exterior power-line noise will be reduced. Isolation of power-line filters and control of 60-Hz ground connections will also be undertaken in the course of upgrading.
TAIPAN instrument fibre positioner and Starbug robots: engineering overview
NASA Astrophysics Data System (ADS)
Staszak, Nicholas F.; Lawrence, Jon; Brown, David M.; Brown, Rebecca; Zhelem, Ross; Goodwin, Michael; Kuehn, Kyler; Lorente, Nuria P. F.; Nichani, Vijay; Waller, Lew; Case, Scott; Content, Robert; Hopkins, Andrew M.; Klauser, Urs; Pai, Naveen; Mueller, Rolf; Mali, Slavko; Vuong, Minh V.
2016-07-01
TAIPAN will conduct a stellar and galaxy survey of the Southern sky. The TAIPAN positioner is being developed as a prototype for the MANIFEST instrument on the GMT. The design for TAIPAN incorporates 150 optical fibres (with an upgrade path to 300) situated within independently controlled robotic positioners known as Starbugs. Starbugs allow precise parallel positioning of individual fibres, thus significantly reducing instrument configuration time and increasing the amount of observing time. Presented is an engineering overview of the UKST upgrade of the completely new Instrument Spider Assembly utilized to support the Starbug Fibre Positioning Robot and current status of the Starbug itself.
Bruning, Oliver
2018-05-23
Overview of the operation and upgrade plans for the machine. Upgrade studies and taskforces. The Chamonix 2010 discussions led to five new task forces: planning for a long shut down in 2012 for splice consolidation; long term consolidation planning for the injector complex; SPS upgrade task force (accelerated program for SPS upgrade); PSB upgrade and its implications for the PS (e.g. radiation etc.); LHC High Luminosity project (investigate planning for ONE upgrade by 2018-2020); Launch of a dedicated study for doubling the beam energy in the LHC->HE-LHC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conklin, Shane
2013-09-30
Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.
Human factors aspects of control room design
NASA Technical Reports Server (NTRS)
Jenkins, J. P.
1983-01-01
A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.
Weiland, Tracey J; Ivory, Sean; Hutton, Jennie
2017-06-01
Effective strategies for managing acute behavioural disturbances (ABDs) within emergency departments (EDs) are needed given their rising occurrence and negative impact on safety, psychological wellbeing, and staff turnover. Non-pharmacological interventions for ABD management generally fall into four categories: environmental modifications; policies; practice changes; and education. Our objective was to systematically review the efficacy of strategies for ABD management within EDs that involved changes to environment, architecture, policy and practice. We performed systematic searches of CINAHL Plus with Full Text, PsycINFO, MEDLINE, and EMBASE, as well as reference lists of relevant review articles to identify relevant studies published between January 1985 - April 2016. We included studies written in English, which reported management of behavioural disturbances in adults associated with the ED through the use of environmental modifiers (including seclusion, restraint, specialised rooms, architectural changes), policy, and practice-based interventions excepting education-only interventions. Efficacy outcomes of interest included incidence, severity, and duration of ABD, incidence of injuries, staff absenteeism, restraint use, restraint duration, and staff and patient perceptions. Two reviewers independently screened titles and abstracts, and assessed the relevancy and eligibility of studies based on full-text articles. Two authors independently appraised included studies. A narrative synthesis of findings was undertaken. Studies reporting interventions for managing ABDs within the ED are limited in number and quality. The level of evidence for efficacy is low, requiring caution in conclusions. While there is preliminary evidence for environmental change in the form of specialised behavioural rooms, security upgrades and ED modifications, these are not supported by evidence from controlled studies. Many of these "common sense" environmental changes recommended in many guidelines have been widely implemented in EDs. There is an unambiguous gap in the literature regarding the efficacy of interventions for ABD management in EDs involving environmental, policy or practice-based changes. With growing demand on EDs, and with increasing numbers of ABDs, identification of robust evidence-based interventions for safe and effective ABD management is vital.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warkentin, H; Bubric, K; Giovannetti, H
2016-06-15
Purpose: As a quality improvement measure, we undertook this work to incorporate usability testing into the implementation procedures for new electronic documents and forms used by four affiliated radiation therapy centers. Methods: A human factors specialist provided training in usability testing for a team of medical physicists, radiation therapists, and radiation oncologists from four radiotherapy centers. A usability testing plan was then developed that included controlled scenarios and standardized forms for qualitative and quantitative feedback from participants, including patients. Usability tests were performed by end users using the same hardware and viewing conditions that are found in the clinical environment.more » A pilot test of a form used during radiotherapy CT simulation was performed in a single department; feedback informed adaptive improvements to the electronic form, hardware requirements, resource accessibility and the usability testing plan. Following refinements to the testing plan, usability testing was performed at three affiliated cancer centers with different vault layouts and hardware. Results: Feedback from the testing resulted in the detection of 6 critical errors (omissions and inability to complete task without assistance), 6 non-critical errors (recoverable), and multiple suggestions for improvement. Usability problems with room layout were detected at one center and problems with hardware were detected at one center. Upon amalgamation and summary of the results, three key recommendations were presented to the document’s authors for incorporation into the electronic form. Documented inefficiencies and patient safety concerns related to the room layout and hardware were presented to administration along with a request for funding to purchase upgraded hardware and accessories to allow a more efficient workflow within the simulator vault. Conclusion: By including usability testing as part of the process when introducing any new document or procedure into clinical use, associated risks can be identified and mitigated before patient care and clinical workflow are impacted.« less
IET. Control room in control building (TAN620). Terminal panels for ...
IET. Control room in control building (TAN-620). Terminal panels for instrumentation wiring. Note alarm horn and emergency light at right edge of view. Cable reel comes from Collier, Pawtucket, RI. Date: February 1955. INEEL negative no. 55-362 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Guidelines on ergonomic aspects of control rooms
NASA Technical Reports Server (NTRS)
Mitchell, C. M.; Bocast, A. K.; Stewart, L. J.
1983-01-01
The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.
Report #12-P-0879, September 26, 2012. The security posture and in-place environmental control review of the computer rooms in the Ariel Rios and Potomac Yard buildings revealed numerous security and environmental control deficiencies.
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
The heat is on: room temperature affects laboratory equipment--an observational study.
Butler, Julia M; Johnson, Jane E; Boone, William R
2013-10-01
To evaluate the effect of ambient room temperature on equipment typically used in in vitro fertilization (IVF). We set the control temperature of the room to 20 °C (+/-0.3) and used CIMScan probes to record temperatures of the following equipment: six microscope heating stages, four incubators, five slide warmers and three heating blocks. We then increased the room temperature to 26 °C (+/-0.3) or decreased it to 17 °C (+/-0.3) and monitored the same equipment again. We wanted to determine what role, if any, changing room temperature has on equipment temperature fluctuation. There was a direct relationship between room temperature and equipment temperature stability. When room temperature increased or decreased, equipment temperature reacted in a corresponding manner. Statistical differences between equipment were found when the room temperature changed. What is also noteworthy is that temperature of equipment responded within 5 min to a change in room temperature. Clearly, it is necessary to be aware of the affect of room temperature on equipment when performing assisted reproductive procedures. Room and equipment temperatures should be monitored faithfully and adjusted as frequently as needed, so that consistent culture conditions can be maintained. If more stringent temperature control can be achieved, human assisted reproduction success rates may improve.
Get a winning Oracle upgrade session using the quarterback approach
NASA Technical Reports Server (NTRS)
Anderson, G.
2002-01-01
Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.
2009-05-06
CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
2009-05-06
CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA
NASA Astrophysics Data System (ADS)
Grujicic, M.; Snipes, J. S.; Galgalikar, R.; Ramaswami, S.; Yavari, R.; Yen, C.-F.; Cheeseman, B. A.
2014-09-01
In our recent work, a multi-physics computational model for the conventional gas metal arc welding (GMAW) joining process was introduced. The model is of a modular type and comprises five modules, each designed to handle a specific aspect of the GMAW process, i.e.: (i) electro-dynamics of the welding-gun; (ii) radiation-/convection-controlled heat transfer from the electric-arc to the workpiece and mass transfer from the filler-metal consumable electrode to the weld; (iii) prediction of the temporal evolution and the spatial distribution of thermal and mechanical fields within the weld region during the GMAW joining process; (iv) the resulting temporal evolution and spatial distribution of the material microstructure throughout the weld region; and (v) spatial distribution of the as-welded material mechanical properties. In the present work, the GMAW process model has been upgraded with respect to its predictive capabilities regarding the spatial distribution of the mechanical properties controlling the ballistic-limit (i.e., penetration-resistance) of the weld. The model is upgraded through the introduction of the sixth module in the present work in recognition of the fact that in thick steel GMAW weldments, the overall ballistic performance of the armor may become controlled by the (often inferior) ballistic limits of its weld (fusion and heat-affected) zones. To demonstrate the utility of the upgraded GMAW process model, it is next applied to the case of butt-welding of a prototypical high-hardness armor-grade martensitic steel, MIL A46100. The model predictions concerning the spatial distribution of the material microstructure and ballistic-limit-controlling mechanical properties within the MIL A46100 butt-weld are found to be consistent with prior observations and general expectations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
Energy Savings and Persistence from an Energy Services Performance Contract at an Army Base
2011-10-01
control system upgrades, lighting retrofits, vending machine controls, and cooling tower variable frequency drivers (VFDs). To accomplish the...controls were installed in the vending machines , and for the 87018 thermal plant, cooling tower VFDs were implemented. To develop baseline models...identify the reasons of improved or deteriorated energy performance of the buildings. For example, periodic submetering of the vending machines
Impact of animal-assisted therapy for outpatients with fibromyalgia.
Marcus, Dawn A; Bernstein, Cheryl D; Constantin, Janet M; Kunkel, Frank A; Breuer, Paula; Hanlon, Raymond B
2013-01-01
Animal-assisted therapy using dogs trained to be calm and provide comfort to strangers has been used as a complementary therapy for a range of medical conditions. This study was designed to evaluate the effects of brief therapy dog visits for fibromyalgia patients attending a tertiary outpatient pain management facility compared with time spent in a waiting room. Open label with waiting room control. Tertiary care, university-based, outpatient pain management clinic. A convenience sample of fibromyalgia patients was obtained through advertisements posted in the clinic. Participants were able to spend clinic waiting time with a certified therapy dog instead of waiting in the outpatient waiting area. When the therapy dog was not available, individuals remained in the waiting area. OUTCOME MEASURES.: Self-reported pain, fatigue, and emotional distress were recorded using 11-point numeric rating scales before and after the therapy dog visit or waiting room time. Data were evaluated from 106 therapy dog visits and 49 waiting room controls, with no significant between-group demographic differences in participants. Average intervention duration was 12 minutes for the therapy dog visit and 17 minutes for the waiting room control. Significant improvements were reported for pain, mood, and other measures of distress among patients after the therapy dog visit, but not the waiting room control. Clinically meaningful pain relief (≥2 points pain severity reduction) occurred in 34% after the therapy dog visit and 4% in the waiting room control. Outcome was not affected by the presence of comorbid anxiety or depression. Brief therapy dog visits may provide a valuable complementary therapy for fibromyalgia outpatients. Wiley Periodicals, Inc.
33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...
33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2007-07-20
JSC2007-E-41011 (20 July 2007) --- STS-118 Ascent/Entry flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich (center right) and astronaut Tony Antonelli, spacecraft communicator (CAPCOM), hold the STS-118 mission logo.
Report #12-P-0847, September 21, 2012.Our review of the security posture and in-place environmental controls of EPA’s Radiation and Indoor Environments National Laboratory computer room disclosed an array of security and environmental control deficiencies.
28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...
28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA
31. Perimeter acquisition radar building room #318, data storage "racks"; ...
31. Perimeter acquisition radar building room #318, data storage "racks"; sign read: M&D controller, logic control buffer, data transmission controller - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
2013-08-09
CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang
A New Curriculum: Energy Outsourcing Brings Cost and Efficiency Benefits.
ERIC Educational Resources Information Center
Dickerman, Robert N.
2002-01-01
Considers the value of colleges and universities upgrading their energy infrastructure and using outsourcing energy management functions to save money and gain greater control of energy operations without substantial investments in staff and resources. (GR)
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, C.B.; Haglund, R.C.; Miller, M.E.
1996-12-31
The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Pro-ram, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the Near the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magneto-hydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) frommore » a 200{degrees}C NaK facility to a 350{degrees}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degrees}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer multiple-hour, MHD tests, all at 230{degrees}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, C.B.; Haglund, R.C.; Miller, M.E.
1996-12-31
The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Program, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magnetohydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) from a 200{degree}Cmore » NaK facility to a 350{degree}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degree}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer, multiple-hour, MHD tests, all at 230{degree}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000. 4 refs., 2 figs.« less
A SUMMARY COMPARISON OF DESIGN EVALUATION TECHNIQUES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spielman, Zachary; Hill, Rachael
The United States’ fleet of Nuclear Reactors is considering modernizing their control rooms and instrumentation as an effort to avoid component obsolescence, keep up with competing industries, and cater to a new work force among others. Multiple technologies have potential to improve the control room. In attempts to evaluate the available options researchers employ a variety of measures to ensure the best candidate is used in a modernizing effort. The NRC is in charge of ensuring any new design has been thoroughly vetted before approving a license. Laid out in NUREG-0711 “Human Factors Engineering Program Review Model” is the reviewmore » criteria for design validation. As there are a variety of measures currently used to evaluate candidate technologies, this paper seeks to identify weaknesses in the common measures used to design and validate technology in control room modernization efforts. Identifying where measurements are not meeting the criteria will help the control room modernization research platform identify where measurement development needs to occur. This will help ensure that current performance measurements are producing as reliable results as possible to select the right technology to integrate into nuclear operating control rooms.« less
Performance of the upgraded Orroral laser ranging system
NASA Technical Reports Server (NTRS)
Luck, John M.
1993-01-01
The topics discussed include the following: upgrade arrangements, system prior to 1991, elements of the upgrade, laser performance, timing system performance, pass productivity, system precision, system accuracy, telescope pointing and future upgrades and extensions.
Enhanced operator perception through 3D vision and haptic feedback
NASA Astrophysics Data System (ADS)
Edmondson, Richard; Light, Kenneth; Bodenhamer, Andrew; Bosscher, Paul; Wilkinson, Loren
2012-06-01
Polaris Sensor Technologies (PST) has developed a stereo vision upgrade kit for TALON® robot systems comprised of a replacement gripper camera and a replacement mast zoom camera on the robot, and a replacement display in the Operator Control Unit (OCU). Harris Corporation has developed a haptic manipulation upgrade for TALON® robot systems comprised of a replacement arm and gripper and an OCU that provides haptic (force) feedback. PST and Harris have recently collaborated to integrate the 3D vision system with the haptic manipulation system. In multiple studies done at Fort Leonard Wood, Missouri it has been shown that 3D vision and haptics provide more intuitive perception of complicated scenery and improved robot arm control, allowing for improved mission performance and the potential for reduced time on target. This paper discusses the potential benefits of these enhancements to robotic systems used for the domestic homeland security mission.
14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. WrightPatterson ...
14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. - Wright-Patterson Air Force Base, Area B, Building No. 20A, Propeller Test Complex, Seventh Street, from E to G Streets, Dayton, Montgomery County, OH
16. View of Building 100 control room. 1987. On file ...
16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
IET control building (TAN620). interior room. sign says, "emergency equipment ...
IET control building (TAN-620). interior room. sign says, "emergency equipment for metal fires." INEEL negative no. HD-21-1-2 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
40 CFR 62.15105 - Who must complete the operator training course? By when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...
40 CFR 62.15105 - Who must complete the operator training course? By when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...
NASA Technical Reports Server (NTRS)
Clinedinst, Winston C.; Debure, Kelly R.; Dickson, Richard W.; Heaphy, William J.; Parks, Mark A.; Slominski, Christopher J.; Wolverton, David A.
1988-01-01
The Flight Management/Flight Controls (FM/FC) software for the Norden 2 (PDP-11/70M) computer installed on the NASA 737 aircraft is described. The software computes the navigation position estimates, guidance commands, those commands to be issued to the control surfaces to direct the aircraft in flight based on the modes selected on the Advanced Guidance Control System (AGSC) mode panel, and the flight path selected via the Navigation Control/Display Unit (NCDU).
PBF Control Building (PER619). Interior detail of control room's severe ...
PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
Control centers design for ergonomics and safety.
Quintana, Leonardo; Lizarazo, Cesar; Bernal, Oscar; Cordoba, Jorge; Arias, Claudia; Monroy, Magda; Cotrino, Carlos; Montoya, Olga
2012-01-01
This paper shows the general design conditions about ergonomics and safety for control centers in the petrochemical process industry. Some of the topics include guidelines for the optimized workstation design, control room layout, building layout, and lighting, acoustical and environmental design. Also takes into account the safety parameters in the control rooms and centers design. The conditions and parameters shown in this paper come from the standards and global advances on this topic on the most recent publications. And also the work was supplemented by field visits of our team to the control center operations in a petrochemical company, and technical literature search efforts. This guideline will be useful to increase the productivity and improve the working conditions at the control rooms.
12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...
12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA
2009-05-06
CAPE CANAVERAL, Fla. – A technician works at installing a new window in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance ...
8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance and inner blast door. - Edwards Air Force Base, South Base Sled Track, Firing & Control Blockhouse for 10,000-foot Track, South of Sled Track at midpoint of 20,000-foot track, Lancaster, Los Angeles County, CA
82. VIEW OF AIRCONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF ...
82. VIEW OF AIR-CONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF SLC-3E CONTROL ROOM. DIAL ON RIGHT (EAST) PERPENDICULAR WALL IS DIMMER FOR ROOM LIGHTING. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Clifford Charlesworth seated at his console in Mission Control Room
1968-12-21
S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.
Southwestern Division 2012 History Report
2013-05-01
maintenance to be performed. Examples of additional maintenance included hydraulic piping replacement, motor control center upgrades, miter gates anchorage...in CEBIS. WATER MANAGEMENT PROGRAM 2012 Hydrology , Hydraulics and Water Management Programs 2012: In March 2012, the Corps’ SWD office...hosted the annual “2012 Reservoir Control Center/Hydrology and Hydraulics annual meeting. The meeting was held in Tulsa, Oklahoma at the Tulsa