Process development for automated solar cell and module production. Task 4: Automated array assembly
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1981-01-01
The Unimate robot was programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. Mechanical construction of the Automated Lamination Station and Final Assembly Station were completed on schedule. All final wiring and interconnect cables were also completed and the first operational testing began. The final controlling program was written. A local fabricator was contracted to produce the glass reinforced concrete panels to be used for testing and deliverables. A video tape showing all three stations in operation was produced.
Process development for automated solar cell and module production. Task 4: Automated array assembly
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1981-01-01
Progress in the development of automated solar cell and module production is reported. The unimate robot is programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. The mechanical construction of the automated lamination station and final assembly station phases are completed and the first operational testing is underway. The final controlling program is written and optimized. The glass reinforced concrete (GRC) panels to be used for testing and deliverables are in production. Test routines are grouped together and defined to produce the final control program.
Buried waste integrated demonstration human engineered control station. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
This document describes the Human Engineered Control Station (HECS) project activities including the conceptual designs. The purpose of the HECS is to enhance the effectiveness and efficiency of remote retrieval by providing an integrated remote control station. The HECS integrates human capabilities, limitations, and expectations into the design to reduce the potential for human error, provides an easy system to learn and operate, provides an increased productivity, and reduces the ultimate investment in training. The overall HECS consists of the technology interface stations, supporting engineering aids, platform (trailer), communications network (broadband system), and collision avoidance system.
NASA Technical Reports Server (NTRS)
1972-01-01
Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.
International Space Station Attitude Motion Associated With Flywheel Energy Storage
NASA Technical Reports Server (NTRS)
Roithmayr, Carlos M.
1999-01-01
Flywheels can exert torque that alters the Station's attitude motion, either intentionally or unintentionally. A design is presented for a once planned experiment to contribute torque for Station attitude control, while storing or discharging energy. Two contingencies are studied: the abrupt stop of one rotor while another rotor continues to spin at high speed, and energy storage performed with one rotor instead of a counter rotating pair. Finally, the possible advantages to attitude control offered by a system of ninety-six flywheels are discussed.
Propulsion requirements for communications satellites.
NASA Technical Reports Server (NTRS)
Isley, W. C.; Duck, K. I.
1972-01-01
The concept of characteristics thrust is introduced herein as a means of classifying propulsion system tasks related particularly to geosynchronous communications spacecraft. Approximate analytical models are developed to permit estimation of characteristic thrust for injection error corrections, orbit angle re-location, north-south station keeping, east-west station keeping, spin axis precession control, attitude rate damping, and orbit raising applications. Performance assessment factors are then outlined in terms of characteristic power, characteristic weight, and characteristic volume envelope, which are related to the characteristic thrust. Finally, selected performance curves are shown for power as a function of spacecraft weight, including the influence of duty cycle on north-south station keeping, a 90 degree orbit angle re-location in 14 days, and finally comparison of orbit raising tasks from low and intermediate orbits to a final geosynchronous station. Power requirements range from less than 75 watts for north-south station keeping on small payloads up to greater than 15 KW for a 180 day orbit raising mission including a 28.5 degree plane change.
Embodiment design for a multipropellant resistojet
NASA Technical Reports Server (NTRS)
Bao, Johnny; Chilosi, Thierry; Goodwin, Jason; Mocio, Jim; Yeh, Bruce
1993-01-01
This document presents the design of a multipropellant resistojet to use as an auxiliary propulsion system on the Space Station. Such a system is necessary to counteract atmospheric drag effects encountered by the Station in its orbit. NASA specifications are strictly followed with emphasis on reliability, operating life, multipropellant capability, and exhaust emission control. Several design variants are considered, and the final solution is a resistojet with an electronic pressure regulator, variable control, an internal flow heater, and a conical nozzle. To construct the resistojet, the important components are resolved independently and then integrated with secondary units. The document also includes engineering drawings of the final design with assembly instructions. Before final utilization, a prototype testing is recommended to uncover possible problems.
A Pressure Control Method for Emulsion Pump Station Based on Elman Neural Network
Tan, Chao; Qi, Nan; Yao, Xingang; Wang, Zhongbin; Si, Lei
2015-01-01
In order to realize pressure control of emulsion pump station which is key equipment of coal mine in the safety production, the control requirements were analyzed and a pressure control method based on Elman neural network was proposed. The key techniques such as system framework, pressure prediction model, pressure control model, and the flowchart of proposed approach were presented. Finally, a simulation example was carried out and comparison results indicated that the proposed approach was feasible and efficient and outperformed others. PMID:25861253
Final Environmental Impact Statement for Oil Refinery, Georgetown, South Carolina. Volume 2.
1984-09-01
at gauging and pumping stations. _adio and telephone communication exists between gaugers and pumping stations or vessels. 2. Describe secondary...thickness gauging . 4. Internal heatingO coil leakage is controlled by one or more of the following control factors: (a) M onitoring the steam return...behavior of sediment and oil emulsions. Journal of Sedimentary Petrology 47(2):671-677. Beam, H.W., South Carolina Coastal Council. [Letter to J.E. Jenkins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurlbut, D. J.; Haase, S.; Brinkman, G.
Pursuant to the Clean Air Act, the U.S. Environmental Protection Agency (EPA) announced in 2009 its intent to issue rules for controlling emissions from Navajo Generating Station that could affect visibility at the Grand Canyon and at several other national parks and wilderness areas. The final rule will conform to what EPA determines is the best available retrofit technology (BART) for the control of haze-causing air pollutants, especially nitrogen oxides. While EPA is ultimately responsible for setting Navajo Generating Station's BART standards in its final rule, it will be the U.S. Department of the Interior's responsibility to manage compliance andmore » the related impacts. This study aims to assist both Interior and EPA by providing an objective assessment of issues relating to the power sector.« less
Study of plasma environments for the integrated Space Station electromagnetic analysis system
NASA Technical Reports Server (NTRS)
Singh, Nagendra
1992-01-01
The final report includes an analysis of various plasma effects on the electromagnetic environment of the Space Station Freedom. Effects of arcing are presented. Concerns of control of arcing by a plasma contactor are highlighted. Generation of waves by contaminant ions are studied and amplitude levels of the waves are estimated. Generation of electromagnetic waves by currents in the structure of the space station, driven by motional EMF, is analyzed and the radiation level is estimated.
Performance evaluation of power control algorithms in wireless cellular networks
NASA Astrophysics Data System (ADS)
Temaneh-Nyah, C.; Iita, V.
2014-10-01
Power control in a mobile communication network intents to control the transmission power levels in such a way that the required quality of service (QoS) for the users is guaranteed with lowest possible transmission powers. Most of the studies of power control algorithms in the literature are based on some kind of simplified assumptions which leads to compromise in the validity of the results when applied in a real environment. In this paper, a CDMA network was simulated. The real environment was accounted for by defining the analysis area and the network base stations and mobile stations are defined by their geographical coordinates, the mobility of the mobile stations is accounted for. The simulation also allowed for a number of network parameters including the network traffic, and the wireless channel models to be modified. Finally, we present the simulation results of a convergence speed based comparative analysis of three uplink power control algorithms.
NASA Astrophysics Data System (ADS)
Burba, G. G.; Johnson, D.; Velgersdyk, M.; Beaty, K.; Forgione, A.; Begashaw, I.; Allyn, D.
2015-12-01
Significant increases in data generation and computing power in recent years have greatly improved spatial and temporal flux data coverage on multiple scales, from a single station to continental flux networks. At the same time, operating budgets for flux teams and stations infrastructure are getting ever more difficult to acquire and sustain. With more stations and networks, larger data flows from each station, and smaller operating budgets, modern tools are needed to effectively and efficiently handle the entire process. This would help maximize time dedicated to answering research questions, and minimize time and expenses spent on data processing, quality control and station management. Cross-sharing the stations with external institutions may also help leverage available funding, increase scientific collaboration, and promote data analyses and publications. FluxSuite, a new advanced tool combining hardware, software and web-service, was developed to address these specific demands. It automates key stages of flux workflow, minimizes day-to-day site management, and modernizes the handling of data flows: Each next-generation station measures all parameters needed for flux computations Field microcomputer calculates final fully-corrected flux rates in real time, including computation-intensive Fourier transforms, spectra, co-spectra, multiple rotations, stationarity, footprint, etc. Final fluxes, radiation, weather and soil data are merged into a single quality-controlled file Multiple flux stations are linked into an automated time-synchronized network Flux network manager, or PI, can see all stations in real time, including fluxes, supporting data, automated reports, and email alerts PI can assign rights, allow or restrict access to stations and data: selected stations can be shared via rights-managed access internally or with external institutions Researchers without stations could form "virtual networks" for specific projects by collaborating with PIs from different actual networks This presentation provides detailed examples of FluxSuite currently utilized by two large flux networks in China (National Academy of Sciences & Agricultural Academy of Sciences), and smaller networks with stations in the USA, Germany, Ireland, Malaysia and other locations around the globe.
NASA Astrophysics Data System (ADS)
Dunn, R. J. H.; Willett, K. M.; Thorne, P. W.; Woolley, E. V.; Durre, I.; Dai, A.; Parker, D. E.; Vose, R. S.
2012-10-01
This paper describes the creation of HadISD: an automatically quality-controlled synoptic resolution dataset of temperature, dewpoint temperature, sea-level pressure, wind speed, wind direction and cloud cover from global weather stations for 1973-2011. The full dataset consists of over 6000 stations, with 3427 long-term stations deemed to have sufficient sampling and quality for climate applications requiring sub-daily resolution. As with other surface datasets, coverage is heavily skewed towards Northern Hemisphere mid-latitudes. The dataset is constructed from a large pre-existing ASCII flatfile data bank that represents over a decade of substantial effort at data retrieval, reformatting and provision. These raw data have had varying levels of quality control applied to them by individual data providers. The work proceeded in several steps: merging stations with multiple reporting identifiers; reformatting to netCDF; quality control; and then filtering to form a final dataset. Particular attention has been paid to maintaining true extreme values where possible within an automated, objective process. Detailed validation has been performed on a subset of global stations and also on UK data using known extreme events to help finalise the QC tests. Further validation was performed on a selection of extreme events world-wide (Hurricane Katrina in 2005, the cold snap in Alaska in 1989 and heat waves in SE Australia in 2009). Some very initial analyses are performed to illustrate some of the types of problems to which the final data could be applied. Although the filtering has removed the poorest station records, no attempt has been made to homogenise the data thus far, due to the complexity of retaining the true distribution of high-resolution data when applying adjustments. Hence non-climatic, time-varying errors may still exist in many of the individual station records and care is needed in inferring long-term trends from these data. This dataset will allow the study of high frequency variations of temperature, pressure and humidity on a global basis over the last four decades. Both individual extremes and the overall population of extreme events could be investigated in detail to allow for comparison with past and projected climate. A version-control system has been constructed for this dataset to allow for the clear documentation of any updates and corrections in the future.
Using Mobile Devices for Robotic Controllers: Examples and Some Initial Concepts for Experimentation
2011-06-01
3 Figure 3. The Sony PlayStation Portable hand-held control device is about 6.7 × 2.9 × 0.9 in. .... 4 Figure 4 . Current...Nunchuk (left) measures 4.45 × 1.5 × 1.48 in. Figure 2. Apple iPhone is 4.5 × 2.31 × 0.37 in. 4 Figure 3. The Sony PlayStation Portable...YYYY) June 2011 2. REPORT TYPE Final 3. DATES COVERED (From - To) June 2010–July 2010 4 . TITLE AND SUBTITLE Using Mobile Devices for Robotic
Human factors issues in telerobotic systems for Space Station Freedom servicing
NASA Technical Reports Server (NTRS)
Malone, Thomas B.; Permenter, Kathryn E.
1990-01-01
Requirements for Space Station Freedom servicing are described and the state-of-the-art for telerobotic system on-orbit servicing of spacecraft is defined. The projected requirements for the Space Station Flight Telerobotic Servicer (FTS) are identified. Finally, the human factors issues in telerobotic servicing are discussed. The human factors issues are basically three: the definition of the role of the human versus automation in system control; the identification of operator-device interface design requirements; and the requirements for development of an operator-machine interface simulation capability.
Unity nameplate gets final check before being attached to module for ISS and Mission STS-88
NASA Technical Reports Server (NTRS)
1998-01-01
- In the Space Station Processing Facility, workers make a final check of the nameplate to be attached to the Unity connecting module, part of the International Space Station. Unity was expected to be transported to Launch Pad 39A on Oct. 26 for launch aboard Space Shuttle Endeavour on Mission STS-88 in December. The Unity is a connecting passageway to the living and working areas of ISS. While on orbit, the flight crew will deploy Unity from the payload bay and attach Unity to the Russian-built Zarya control module which will be in orbit at that time.
2011-07-08
CAPE CANAVERAL, Fla. -- Launch controllers wave their STS-135 shuttle launch team member flags and cheer in Firing Room 4 of the Launch Control Center following the successful launch of space shuttle Atlantis from NASA's Kennedy Space Center in Florida. Atlantis began its final flight, the STS-135 mission to the International Space Station, at 11:29 a.m. EDT on July 8. STS-135 will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also is flying the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2008-11-19
CAPE CANAVERAL, Fla. – Workers in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida oversee placement of the Cupola module onto a workstand. The module was delivered to Kennedy by the European Space Agency in 2004 from Alenia Spazio in Turin, Italy. Cupola will provide a 360-degree panoramic view of activities outside the station and spectacular views of the Earth. Cupola has the capability for command and control workstations to be installed to assist in space station remote manipulator system and extra vehicular activities. The final element of the space station core, Cupola is scheduled for launch on space shuttle Endeavour's STS-130 mission, targeted for Dec. 10, 2009. Photo credit: NASA/Cory Huston
2008-11-19
CAPE CANAVERAL, Fla. – Suspended by a crane in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Cupola module is being moved to a workstand. The module was delivered to Kennedy by the European Space Agency in 2004 from Alenia Spazio in Turin, Italy. Cupola will provide a 360-degree panoramic view of activities outside the station and spectacular views of the Earth. Cupola has the capability for command and control workstations to be installed to assist in space station remote manipulator system and extra vehicular activities. The final element of the space station core, Cupola is scheduled for launch on space shuttle Endeavour's STS-130 mission, targeted for Dec. 10, 2009. Photo credit: NASA/Cory Huston
2008-11-19
CAPE CANAVERAL, Fla. – Suspended by a crane in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Cupola module is lowered toward the workstand. The module was delivered to Kennedy by the European Space Agency in 2004 from Alenia Spazio in Turin, Italy. Cupola will provide a 360-degree panoramic view of activities outside the station and spectacular views of the Earth. Cupola has the capability for command and control workstations to be installed to assist in space station remote manipulator system and extra vehicular activities. The final element of the space station core, Cupola is scheduled for launch on space shuttle Endeavour's STS-130 mission, targeted for Dec. 10, 2009. Photo credit: NASA/Cory Huston
2008-11-19
CAPE CANAVERAL, Fla. – Suspended by a crane in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Cupola module moves closer to the workstand at right. The module was delivered to Kennedy by the European Space Agency in 2004 from Alenia Spazio in Turin, Italy. Cupola will provide a 360-degree panoramic view of activities outside the station and spectacular views of the Earth. Cupola has the capability for command and control workstations to be installed to assist in space station remote manipulator system and extra vehicular activities. The final element of the space station core, Cupola is scheduled for launch on space shuttle Endeavour's STS-130 mission, targeted for Dec. 10, 2009. Photo credit: NASA/Cory Huston
Views of the ISS during Endeavour's final flyaround for STS-97
2000-12-09
STS097-712-004 (9 December 2000) --- This picture of the distant International Space Station (ISS) blended against the darkness of space and the blue Earth at its horizon is one of a series of 70mm frames exposed of the station following undocking at 1:13 p.m. (CST), December 9, 2000. This series of images, as well as video and digital still imagery taken at the same time, represent the first imagery of the entire station with its new solar array panels deployed, though they are difficult to see in this angle. Before separation, the shuttle and space station had been docked to one another for 6 days, 23 hours and 13 minutes. Endeavour moved downward from the space station, then began a tail-first circle at a distance of about 500 feet. The maneuver, with pilot Michael J. Bloomfield at the controls, took about an hour. While Endeavour flew that circle, the two spacecraft, moving at five miles a second, navigated about two-thirds of the way around the Earth. Undocking took place 235 statute miles above the border of Kazakhstan and China. When Endeavour made its final separation burn, the orbiter and the space station were near the northeastern coast of South America.
NASA Astrophysics Data System (ADS)
Schillak, S.; Wnuk, E.
Determination of the stations coordinates and the control of their stability is one of the most important task in the satellite geodesy and geodynamics. This work is continu- ation of the similar paper about coordinates stability of the all SLR stations in 1999. The paper present results of positions determination for all SLR stations in 2000 cal- culated in the ITRF2000 system on the basis of data provided by the LAGEOS-1 and LAGEOS-2 laser ranging. The calculations were performed with the usage of the GEODYN II program. Coordinates of the stations were determined from monthly arcs for 2000. Typical RMS of (O-C) values for the monthly orbital arcs was on a level of 1.7 cm. The final stability of the geocentric coordinates of SLR stations per one year for all components varies from 5 millimetres to several centimetres.
2009-07-01
including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215...Canaveral Air Force Station (CCAFS) Skid Strip. Since the facility no longer operates as a missile skid strip, it is referred to as the "Airfield...construction of a new 65 foot tall control tower; construction of a new Airfield Manager (AM) Operations Building that would adjoin the new tower; and
2011-07-08
CAPE CANAVERAL, Fla. -- Launch controllers wave their STS-135 shuttle launch team member flags and cheer in Firing Room 4 of the Launch Control Center following the successful launch of space shuttle Atlantis from NASA's Kennedy Space Center in Florida. In the foreground, from left, are NASA Test Directors Charlie Blackwell-Thompson, Jeremy Graeber, and Jeff Spaulding; Orbiter Test Conductor Roberta Wyrick; and Assistant Orbiter Test Conductor Laurie Sally. Atlantis began its final flight, the STS-135 mission to the International Space Station, at 11:29 a.m. EDT on July 8. STS-135 will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also is flying the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
Hand controller study of force and control mode
NASA Technical Reports Server (NTRS)
Morris, A. Terry
1992-01-01
The objectives are to compare and evaluate the utility and effectiveness of various input control devices, e.g., hand controllers, with respect to the relative importance of force and operation control mode (rate or position) for Space Station Freedom (SSF) related tasks. The topics are presented in viewgraph form and include the: Intelligent Research Systems Lab (ISRL) experimental design; Telerobotic Systems Research Laboratory (TSRL) final experimental design; and factor analysis summary of results.
2008-11-21
to air squadrons. 4. USS John F. Kennedy was decommissioned in 2007. Source: Adapted from DoN 2006a Final EIS for the Proposed Homeporting of...Tugs Slot Small Craft 650 35 YD/YC/LCM Source: Adapted from Naval Facilities Engineering Service Center 2002 MCM = Mine Countermeasures DDG...It would include nonradiologically controlled spaces for administrative and other support functions. The design would be a site- adapted replication of
Spatial regression test for ensuring temperature data quality in southern Spain
NASA Astrophysics Data System (ADS)
Estévez, J.; Gavilán, P.; García-Marín, A. P.
2018-01-01
Quality assurance of meteorological data is crucial for ensuring the reliability of applications and models that use such data as input variables, especially in the field of environmental sciences. Spatial validation of meteorological data is based on the application of quality control procedures using data from neighbouring stations to assess the validity of data from a candidate station (the station of interest). These kinds of tests, which are referred to in the literature as spatial consistency tests, take data from neighbouring stations in order to estimate the corresponding measurement at the candidate station. These estimations can be made by weighting values according to the distance between the stations or to the coefficient of correlation, among other methods. The test applied in this study relies on statistical decision-making and uses a weighting based on the standard error of the estimate. This paper summarizes the results of the application of this test to maximum, minimum and mean temperature data from the Agroclimatic Information Network of Andalusia (southern Spain). This quality control procedure includes a decision based on a factor f, the fraction of potential outliers for each station across the region. Using GIS techniques, the geographic distribution of the errors detected has been also analysed. Finally, the performance of the test was assessed by evaluating its effectiveness in detecting known errors.
2001-08-05
KENNEDY SPACE CENTER, Fla. -- STS-105 Commander Scott Horowitz arrives at KSC aboard a T-38 jet to make final preparations for launch. On mission STS-105, Discovery will be transporting the Expedition Three crew and several payloads and scientific experiments to the International Space Station. The Early Ammonia Servicer (EAS) tank, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch of Discovery on mission STS-105 is scheduled for Aug. 9, 2001
Space Station requirements for in-flight exercise countermeasures
NASA Technical Reports Server (NTRS)
Hayes, Judith C.; Harris, Bernard A.
1990-01-01
In an effort to retard the deleterious effects of space adaptation, NASA has defined requirements for an Exercise Countermeasure Facility (ECF) within the Space Station Crew Health Care System (CHeCS). The application of exercise as a countermeasure to spaceflight-induced deconditioning has been utilized in the past by both the United States and the Soviet space programs. The ECF will provide exercise hardware, physiological monitoring capabilities, and an interactive motivational display system. ECF operations and data will be coupled through the Space Station Freedom Data Management System for monitoring of inflight training and testing from ground control, thus allowing for real-time evaluation of crewmember performance and modification of exercise prescriptions. Finally, the objective of the ECF is to monitor and control the exercise of crewmembers for the maintenance of an operational level of fitness to ensure mission success.
WILBER and PyWEED: Event-based Seismic Data Request Tools
NASA Astrophysics Data System (ADS)
Falco, N.; Clark, A.; Trabant, C. M.
2017-12-01
WILBER and PyWEED are two user-friendly tools for requesting event-oriented seismic data. Both tools provide interactive maps and other controls for browsing and filtering event and station catalogs, and downloading data for selected event/station combinations, where the data window for each event/station pair may be defined relative to the arrival time of seismic waves from the event to that particular station. Both tools allow data to be previewed visually, and can download data in standard miniSEED, SAC, and other formats, complete with relevant metadata for performing instrument correction. WILBER is a web application requiring only a modern web browser. Once the user has selected an event, WILBER identifies all data available for that time period, and allows the user to select stations based on criteria such as the station's distance and orientation relative to the event. When the user has finalized their request, the data is collected and packaged on the IRIS server, and when it is ready the user is sent a link to download. PyWEED is a downloadable, cross-platform (Macintosh / Windows / Linux) application written in Python. PyWEED allows a user to select multiple events and stations, and will download data for each event/station combination selected. PyWEED is built around the ObsPy seismic toolkit, and allows direct interaction and control of the application through a Python interactive console.
An update to the analysis of the Canadian Spatial Reference System
NASA Astrophysics Data System (ADS)
Ferland, R.; Piraszewski, M.; Craymer, M.
2015-12-01
The primary objective of the Canadian Spatial Reference System (CSRS) is to provide users access to a consistent geo-referencing infrastructure over the Canadian landmass. Global Navigation Satellite System (GNSS) positioning accuracy requirements ranges from meter level to mm level (e.g.: crustal deformation). The highest level of the Canadian infrastructure consist of a network of continually operating GPS and GNSS receivers, referred to as active control stations. The network includes all Canadian public active control stations, some bordering US CORS and Alaska stations, Greenland active control stations, as well as a selection of IGS reference frame stations. The Bernese analysis software is used for the daily processing and the combination into weekly solutions which form the basis for this analysis. IGS weekly final orbit, Earth Rotation parameters (ERP's) and coordinates products are used in the processing. For the more demanding users, the time dependant changes of station coordinates is often more important.All station coordinate estimates and related covariance information is used in this analysis. For each input solution, variance factor, translation, rotation and scale (and if needed their rates) or subsets of these are estimated. In the combination of these weekly solutions, station positions and velocities are estimated. Since the time series from the stations in these networks often experience changes in behavior, new (or reuse of) parameters are generally used in these situations. As is often the case with real data, unrealistic coordinates may occur. Automatic detection and removal of outliers is used in these cases. For the transformation, position and velocity parameters loose apriori estimates and uncertainties are provided. Alignment using the usual Helmert transformation to the latest IGb08 realization of ITRF is also performed during the adjustment.
Observations of the Performance of the U.S. Laboratory Architecture
NASA Technical Reports Server (NTRS)
Jones, Rod
2002-01-01
The United States Laboratory Module "Destiny" was the product of many architectural, technology, manufacturing, schedule and cost constraints which spanned 15 years. Requirements for the Space Station pressurized elements were developed and baselined in the mid to late '80's. Although the station program went through several design changes the fundamental requirements that drove the architecture did not change. Manufacturing of the U.S. Laboratory began in the early 90's. Final assembly and checkout testing completed in December of 2000. Destiny was launched, mated to the International Space Station and successfully activated on the STS-98 mission in February of 2001. The purpose of this paper is to identify key requirements, which directly or indirectly established the architecture of the U.S. Laboratory. Provide an overview of how that architecture affected the manufacture, assembly, test, and activation of the module on-orbit. And finally, through observations made during the last year of operation, provide considerations in the development of future requirements and mission integration controls for space habitats.
Concept and realization of unmanned aerial system with different modes of operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Czyba, Roman; Szafrański, Grzegorz; Janusz, Wojciech
2014-12-10
In this paper we describe the development process of unmanned aerial system, its mechanical components, electronics and software solutions. During the stage of design, we have formulated some necessary requirements for the multirotor vehicle and ground control station in order to build an optimal system which can be used for the reconnaissance missions. Platform is controlled by use of the ground control station (GCS) and has possibility of accomplishing video based observation tasks. In order to fulfill this requirement the on-board payload consists of mechanically stabilized camera augmented with machine vision algorithms to enable object tracking tasks. Novelty of themore » system are four modes of flight, which give full functionality of the developed UAV system. Designed ground control station is consisted not only of the application itself, but also a built-in dedicated components located inside the chassis, which together creates an advanced UAV system supporting the control and management of the flight. Mechanical part of quadrotor is designed to ensure its robustness while meeting objectives of minimizing weight of the platform. Finally the designed electronics allows for implementation of control and estimation algorithms without the needs for their excessive computational optimization.« less
2014-08-15
CAPE CANAVERAL, Fla. – The Kennedy Space Center Visitor Complex Spaceperson poses for a photo with Carver Middle School students and their teacher from Orlando, Florida, during the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. The team, members of the After School All-Stars, were regional winners and advanced to the final competition. For the competition, students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
Low-Cost Options for Moderate Levels of Mercury Control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharon Sjostrom
2006-03-31
On March 15, 2005, EPA issued the Clean Air Mercury Rule, requiring phased-in reductions of mercury emissions from electric power generators. ADA-ES, Inc., with support from DOE/NETL and industry partners, is conducting evaluations of EPRI's TOXECON II{trademark} process and of high-temperature reagents and sorbents to determine the capabilities of sorbent/reagent injection, including activated carbon, for mercury control on different coals and air emissions control equipment configurations. DOE/NETL targets for total mercury removal are {ge}55% (lignite), {ge}65% (subbituminous), and {ge}80% (bituminous). Based on work done to date at various scales, meeting the removal targets appears feasible. However, work needs to progressmore » to more thoroughly document and test these promising technologies at full scale. This is the final site report for tests conducted at MidAmerican's Louisa Station, one of three sites evaluated in this DOE/NETL program. The other two sites in the program are MidAmerican's Council Bluff Station and Entergy's Independence Station. MidAmerican's Louisa Station burns Powder River Basin (PRB) coal and employs hot-side electrostatic precipitators with flue gas conditioning for particulate control. This part of the testing program evaluated the effect of reagents used in the existing flue gas conditioning on mercury removal.« less
Lunar Orbiter 4 - Photographic Mission Summary. Volume 1
NASA Technical Reports Server (NTRS)
1968-01-01
Photographic summary report of Lunar Orbiter 4 mission. The fourth of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 22:25 GMT on May 4, 1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final maneuvering and acceleration to the velocity required to maintain the 100-nauticalmile- altitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the boost trajectory.
2014-08-15
CAPE CANAVERAL, Fla. – Florida middle school students and their teachers watch the Zero Robotics finals competition broadcast live via webex from the International Space Station. The Florida teams are at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
Lunar Orbiter 5. Photographic Mission Summary. Volume 1
NASA Technical Reports Server (NTRS)
1968-01-01
Selected photographs and mission summary of Lunar Orbiter 5. The last of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 22:33 GMT on August 1, 1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final maneuvering and acceleration to the velocity required to maintain the 100-nautical-mile-altitude Earth orbit were controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-bum period required to inject the spacecraft on the cislunar trajectory about 33 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the boost trajectory.
Lunar Orbiter 3 - Photographic Mission Summary
NASA Technical Reports Server (NTRS)
1968-01-01
Systems performance, lunar photography, and launch operations of Lunar Orbiter 3 photographic mission. The third of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 01:17 GMT on February 5,1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final 1 maneuvering and acceleration to the velocity required to maintain the 100-nautical-milealtitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.
Standardized Automated CO2/H2O Flux Systems for Individual Research Groups and Flux Networks
NASA Astrophysics Data System (ADS)
Burba, George; Begashaw, Israel; Fratini, Gerardo; Griessbaum, Frank; Kathilankal, James; Xu, Liukang; Franz, Daniela; Joseph, Everette; Larmanou, Eric; Miller, Scott; Papale, Dario; Sabbatini, Simone; Sachs, Torsten; Sakai, Ricardo; McDermitt, Dayle
2017-04-01
In recent years, spatial and temporal flux data coverage improved significantly, and on multiple scales, from a single station to continental networks, due to standardization, automation, and management of data collection, and better handling of the extensive amounts of generated data. With more stations and networks, larger data flows from each station, and smaller operating budgets, modern tools are required to effectively and efficiently handle the entire process. Such tools are needed to maximize time dedicated to authoring publications and answering research questions, and to minimize time and expenses spent on data acquisition, processing, and quality control. Thus, these tools should produce standardized verifiable datasets and provide a way to cross-share the standardized data with external collaborators to leverage available funding, promote data analyses and publications. LI-COR gas analyzers are widely used in past and present flux networks such as AmeriFlux, ICOS, AsiaFlux, OzFlux, NEON, CarboEurope, and FluxNet-Canada, etc. These analyzers have gone through several major improvements over the past 30 years. However, in 2016, a three-prong development was completed to create an automated flux system which can accept multiple sonic anemometer and datalogger models, compute final and complete fluxes on-site, merge final fluxes with supporting weather soil and radiation data, monitor station outputs and send automated alerts to researchers, and allow secure sharing and cross-sharing of the station and data access. Two types of these research systems were developed: open-path (LI-7500RS) and enclosed-path (LI-7200RS). Key developments included: • Improvement of gas analyzer performance • Standardization and automation of final flux calculations onsite, and in real-time • Seamless integration with latest site management and data sharing tools In terms of the gas analyzer performance, the RS analyzers are based on established LI-7500/A and LI-7200 models, and the improvements focused on increased stability in the presence of contamination, refining temperature control and compensation, and providing more accurate fast gas concentration measurements. In terms of the flux calculations, improvements focused on automating the on-site flux calculations using EddyPro® software run by a weatherized fully digital microcomputer, SmartFlux2. In terms of site management and data sharing, the development focused on web-based software, FluxSuite, which allows real-time station monitoring and data access by multiple users. The presentation will describe details for the key developments and will include results from field tests of the RS gas analyzer models in comparison with older models and control reference instruments.
A study of universal modulation techniques applied to satellite data collection
NASA Technical Reports Server (NTRS)
1980-01-01
A universal modulation and frequency control system for use with data collection platform (DCP) transmitters is examined. The final design discussed can, under software/firmwave control, generate all of the specific digital data modulation formats currently used in the NASA satellite data collection service and can simultaneously synthesize the proper RF carrier frequencies employed. A novel technique for DCP time and frequency control is presented. The emissions of NBS radio station WWV/WWVH are received, detected, and finally decoded in microcomputer software to generate a highly accurate time base for the platform; with the assistance of external hardware, the microcomputer also directs the recalibration of all DCP oscillators to achieve very high frequency accuracies and low drift rates versus temperature, supply voltage, and time. The final programmable DCP design also employs direct microcomputer control of data reduction, formatting, transmitter switching, and system power management.
NASA Astrophysics Data System (ADS)
Burba, George; Johnson, Dave; Velgersdyk, Michael; Begashaw, Israel; Allyn, Douglas
2016-04-01
In recent years, spatial and temporal flux data coverage improved significantly and on multiple scales, from a single station to continental networks, due to standardization, automation, and management of the data collection, and better handling of the extensive amounts of generated data. However, operating budgets for flux research items, such as labor, travel, and hardware, are becoming more difficult to acquire and sustain. With more stations and networks, larger data flows from each station, and smaller operating budgets, modern tools are required to effectively and efficiently handle the entire process, including sharing data among collaborative groups. On one hand, such tools can maximize time dedicated to publications answering research questions, and minimize time and expenses spent on data acquisition, processing, quality control and overall station management. On the other hand, cross-sharing the stations with external collaborators may help leverage available funding, and promote data analyses and publications. A new low-cost, advanced system, FluxSuite, utilizes a combination of hardware, software and web-services to address these specific demands. It automates key stages of flux workflow, minimizes day-to-day site management, and modernizes the handling of data flows: (i) The system can be easily incorporated into a new flux station, or as un upgrade to many presently operating flux stations, via weatherized remotely-accessible microcomputer, SmartFlux 2, with fully digital inputs (ii) Each next-generation station will measure all parameters needed for flux computations in a digital and PTP time-synchronized mode, accepting digital signals from a number of anemometers and data loggers (iii) The field microcomputer will calculate final fully-processed flux rates in real time, including computation-intensive Fourier transforms, spectra, co-spectra, multiple rotations, stationarity, footprint, etc. (iv) Final fluxes, radiation, weather and soil data will be merged into a single quality-control file (v) Multiple flux stations can be linked into an automated time-synchronized network (vi) Flux network managers, or PI's, can see all stations in real-time, including fluxes, supporting data, automated reports, and email alerts (vii) PI's can assign rights, allow or restrict access to stations and data: selected stations can be shared via rights-managed access internally or with external institutions (viii) Researchers without stations could form "virtual networks" for specific projects by collaborating with PIs from different actual networks This presentation provides detailed examples of FluxSuite currently utilized to manage two large flux networks in China (National Academy of Sciences and Agricultural Academy of Sciences), and smaller networks with stations in the USA, Germany, Ireland, Malaysia and other locations around the globe. Very latest 2016 developments and expanded functionality are also discussed.
Final MTI Data Report: Pilgrim Nuclear Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, M.J.
2003-03-17
During the period from May 2000 to September 2001, ocean surface water temperature data was collected at the Pilgrim Nuclear Power Station near Plymouth, MA. This effort was led by the Savannah River Technology Center (SRTC) with the assistance of a local sub-contractor, Marine BioControl Corporation of Sandwich, MA. Permission for setting up the monitoring system was granted by Energy Corporation, which owns the plant site. This work was done in support of SRTC's ground truth mission for the U.S. Department of Energy's Multispectral Thermal Imager (MTI) satellite.
1998-10-22
In the Space Station Processing Facility, workers make a final check of the nameplate to be attached to the Unity connecting module, part of the International Space Station. Unity was expected to be transported to Launch Pad 39A on Oct. 26 for launch aboard Space Shuttle Endeavour on Mission STS-88 in December. The Unity is a connecting passageway to the living and working areas of ISS. While on orbit, the flight crew will deploy Unity from the payload bay and attach Unity to the Russian-built Zarya control module which will be in orbit at that time
A Hybrid Authentication and Authorization Process for Control System Networks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Manz, David O.; Edgar, Thomas W.; Fink, Glenn A.
2010-08-25
Convergence of control system and IT networks require that security, privacy, and trust be addressed. Trust management continues to plague traditional IT managers and is even more complex when extended into control system networks, with potentially millions of entities, a mission that requires 100% availability. Yet these very networks necessitate a trusted secure environment where controllers and managers can be assured that the systems are secure and functioning properly. We propose a hybrid authentication management protocol that addresses the unique issues inherent within control system networks, while leveraging the considerable research and momentum in existing IT authentication schemes. Our hybridmore » authentication protocol for control systems provides end device to end device authentication within a remote station and between remote stations and control centers. Additionally, the hybrid protocol is failsafe and will not interrupt communication or control of vital systems in a network partition or device failure. Finally, the hybrid protocol is resilient to transitory link loss and can operate in an island mode until connectivity is reestablished.« less
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket is in position for a wet dress rehearsal at Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket is in position for a wet dress rehearsal at Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket is in position for a wet dress rehearsal at Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
Space station automation: the role of robotics and artificial intelligence (Invited Paper)
NASA Astrophysics Data System (ADS)
Park, W. T.; Firschein, O.
1985-12-01
Automation of the space station is necessary to make more effective use of the crew, to carry out repairs that are impractical or dangerous, and to monitor and control the many space station subsystems. Intelligent robotics and expert systems play a strong role in automation, and both disciplines are highly dependent on a common artificial intelligence (Al) technology base. The AI technology base provides the reasoning and planning capabilities needed in robotic tasks, such as perception of the environment and planning a path to a goal, and in expert systems tasks, such as control of subsystems and maintenance of equipment. This paper describes automation concepts for the space station, the specific robotic and expert systems required to attain this automation, and the research and development required. It also presents an evolutionary development plan that leads to fully automatic mobile robots for servicing satellites. Finally, we indicate the sequence of demonstrations and the research and development needed to confirm the automation capabilities. We emphasize that advanced robotics requires AI, and that to advance, AI needs the "real-world" problems provided by robotics.
Investigation of Stability of Precise Geodetic Instruments Used in Deformation Monitoring
NASA Astrophysics Data System (ADS)
Woźniak, Marek; Odziemczyk, Waldemar
2017-12-01
Monitoring systems using automated electronic total stations are an important element of safety control of many engineering objects. In order to ensure the appropriate credibility of acquired data, it is necessary that instruments (total stations in most of the cases) used for measurements meet requirements of measurement accuracy, as well as the stability of instrument axis system geometry. With regards to the above, it is expedient to conduct quality control of data acquired using electronic total stations in the context of performed measurement procedures. This paper presents results of research conducted at the Faculty of Geodesy and Cartography at Warsaw University of Technology investigating the stability of "basic" error values (collimation, zero location for V circle, inclination), for two types of automatic total stations: TDA 5005 and TCRP 1201+. Research provided also information concerning the influence of temperature changes upon the stability of investigated instrument's optical parameters. Results are presented in graphical analytic technique. Final conclusions propose methods, which allow avoiding negative results of measuring tool-set geometry changes during conducting precise deformation monitoring measurements.
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-074 (1 June 2011) --- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units, which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-088 (1 June 2011) --- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units, which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-087 (1 June 2011) --- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units, which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-085 (1 June 2011) --- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units, which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-086 (1 June 2011) --- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units, which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Engineering and Design: Control Stations and Control Systems for Navigation Locks and Dams
1997-05-30
of human intelli- hypothetical lock and dam configurations. Finally, b. Terminology. (1) PLC system. The computer- based systems utilize special...electrical industry for industrial use. There- fore, for purposes of this document, a computer- based system is referred to as a PLC system. (2) Relay- based ...be custom made, because most of today’s control systems of any complexity are PLC - based , the standard size of a given motor starter cubicle is not
2001-08-06
KENNEDY SPACE CENTER, Fla. -- STS-105 Commander Scott Horowitz prepares to climb into the cockpit of a T-38 jet for a training flight from the Kennedy Space Center Shuttle Landing Facility. He and the rest of the crew are at Kennedy to make final preparations for launch. On mission STS-105, Discovery will be transporting the Expedition Three crew and several payloads and scientific experiments to the International Space Station. The Early Ammonia Servicer (EAS) tank, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch is scheduled for Aug. 9, 2001
2001-08-06
KENNEDY SPACE CENTER, Fla. -- Climbing into the T-38 jet at the Kennedy Space Center Shuttle Landing Facility for a training flight are STS-105 Pilot Rick Sturckow (left) and Mission Specialist Patrick Forrester (right). The STS-105 and Expedition Three crews are at Kennedy to make final preparations for launch. On mission STS-105, Discovery will be transporting the Expedition Three crew and several payloads and scientific experiments to the International Space Station. The Early Ammonia Servicer (EAS) tank, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch is scheduled for Aug. 9, 2001
Unity hatch closed in preparation for launch on STS-88
NASA Technical Reports Server (NTRS)
1998-01-01
Workers in the Space Station Processing Facility make final preparations for closing the access hatch to the Unity connecting module, part of the International Space Station, before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time.
International Space Station Environmental Control and Life Support System Status: 2002-2003
NASA Technical Reports Server (NTRS)
Wiliams, David E.; Lewis, John F.; Gentry, Gregory
2003-01-01
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2002 and March 2003. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements with Node 3 just completing its final design review so that it can proceed towards manufacturing and the continued manufacturing of the regenerative ECLS equipment that will be integrated into Node 3.
NASA Technical Reports Server (NTRS)
1973-01-01
Configuration data and design information for the space shuttle launched configuration is presented. The overall system definition, operations and control, and telecommunication service system including link budgets are discussed. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form.
2012-08-31
CAPE CANAVERAL, Fla. -- At Space Launch Complex 40 on Cape Canaveral Air Force Station in Florida, the Space Exploration Technologies, or SpaceX, Falcon 9 rocket is moved into a vertical position for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket rolls out of its processing hangar toward Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- At Space Launch Complex 40 on Cape Canaveral Air Force Station in Florida, the Space Exploration Technologies, or SpaceX, Falcon 9 rocket is moved into a vertical position for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket rolls out of its processing hangar toward Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- The Space Exploration Technologies, or SpaceX, Falcon 9 rocket rolls out of its processing hangar toward Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2012-08-31
CAPE CANAVERAL, Fla. -- At Space Launch Complex 40 on Cape Canaveral Air Force Station in Florida, the Space Exploration Technologies, or SpaceX, Falcon 9 rocket is moved into a vertical position for a wet dress rehearsal. During the rehearsal, the rocket will be fully fueled and launch controllers will perform a countdown demonstration. The rehearsal is in preparation for the company's first Commercial Resupply Services, or CRS, mission to the International Space Station aboard the Dragon capsule. The SpaceX CRS contract with NASA provides for 12 cargo resupply missions to the station through 2015, the first of which is targeted to launch in October 2012.SpaceX became the first private company to berth a spacecraft with the space station in 2012 during its final demonstration flight under the Commercial Orbital Transportation Services, or COTS, program managed by NASA's Johnson Space Center in Houston. Photo credit: NASA/Jim Grossmann
2000-10-11
STS-92 Mission Specialist William S. McArthur Jr. undergoes final suit check in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. McArthur and the rest of the crew are making the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
2000-10-11
STS-92 Commander Brian Duffy is helped with final suit check in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Duffy and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
2000-10-11
STS-92 Pilot Pamela Ann Melroy has a final check on her launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Melroy and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
ERIC Educational Resources Information Center
Pieper, William J.; And Others
This study was initiated to design, develop, implement, and evaluate a videodisc-based simulator system, the Interactive Graphics Simulator (IGS) for 6883 Converter Flight Control Test Station training at Lowry Air Force Base, Colorado. The simulator provided a means for performing task analysis online, developing simulations from the task…
2014-07-24
Optical PAyload for Lasercomm Science OPALS flight terminal undergoes final testing at NASA Jet Propulsion Laboratory. OPALS was launched to the International Space Station from Cape Canaveral Air Force Station in Florida on April 18, 2014.
2014-07-24
The Optical PAyload for Lasercomm Science OPALS undergoes final inspection prior to shipment to NASA Kennedy Space Center. OPALS was launched to the International Space Station from Cape Canaveral Air Force Station in Florida on April 18, 2014.
76 FR 79541 - Revisions to Final Response to Petition From New Jersey Regarding SO2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... Revisions to Final Response to Petition From New Jersey Regarding SO2 Emissions From the Portland Generating... Jersey Regarding SO2 Emissions From the Portland Generating Station (Portland) published November 7, 2011... Final Response to Petition From New Jersey Regarding SO2 Emissions From the Portland Generating Station...
2001-08-05
KENNEDY SPACE CENTER, Fla. -- STS-105 Mission Specialist Patrick Forrester (left) and Pilot Rick Sturckow (right) walk away from the T-38 jet they arrived in at the KSC Shuttle Landing Facility. The STS-105 and Expedition Three crews are returning to Kennedy to make final preparations for launch . On mission STS-105, Discovery will be transporting the Expedition Three crew and several payloads and scientific experiments to the International Space Station. The Early Ammonia Servicer (EAS) tank, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch of Discovery on mission STS-105 is scheduled for Aug. 9, 2001
Automation in the Space Station module power management and distribution Breadboard
NASA Technical Reports Server (NTRS)
Walls, Bryan; Lollar, Louis F.
1990-01-01
The Space Station Module Power Management and Distribution (SSM/PMAD) Breadboard, located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, models the power distribution within a Space Station Freedom Habitation or Laboratory module. Originally designed for 20 kHz ac power, the system is now being converted to high voltage dc power with power levels on a par with those expected for a space station module. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level process consists of fast, simple (from a computing standpoint) switchgear, capable of quickly safing the system. The next level consists of local load center processors called Lowest Level Processors (LLP's). These LLP's execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. The level above the LLP's contains a Communication and Algorithmic Controller (CAC) which coordinates communications with the highest level. Finally, at this highest level, three cooperating Artificial Intelligence (AI) systems manage load prioritization, load scheduling, load shedding, and fault recovery and management. The system provides an excellent venue for developing and examining advanced automation techniques. The current system and the plans for its future are examined.
Modular space station mass properties
NASA Technical Reports Server (NTRS)
1972-01-01
An update of the space station mass properties is presented. Included are the final status update of the Initial Space Station (ISS) modules and logistic module plus incorporation of the Growth Space Station (GSS) module additions.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...
Final Environmental Assessment of Mosquito Control at Joint Base Charleston - Weapons Station
2011-04-01
that wildlife mortalities in wetlands may be more difficult to detect than in agricultural areas. Naled is considered toxic to bees . Droplets of the...14 Figure 3-2. Wetlands and Floodplain Map...climate which contribute to the perpetuation of considerable expanses of wetlands and open water. Unlike natural breeding habitats, there are no natural
2011-06-01
CAPE CANAVERAL, Fla. -- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units (APUs), which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kenny Allen
NASA Technical Reports Server (NTRS)
Red, Michael T.; Hess, Philip W.
1989-01-01
Among the Lyndon B. Johnson Space Center's responsibilities for Space Station Freedom is the cupola. Attached to the resource node, the cupola is a windowed structure that will serve as the space station's secondary control center. From the cupola, operations involving the mobile service center and orbital maneuvering vehicle will be conducted. The Systems Engineering Simulator (SES), located in building 16, activated a real-time man-in-the-loop cupola simulator in November 1987. The SES cupola is an engineering tool with the flexibility to evolve in both hardware and software as the final cupola design matures. Two workstations are simulated with closed-circuit television monitors, rotational and translational hand controllers, programmable display pushbuttons, and graphics display with trackball and keyboard. The displays and controls of the SES cupola are driven by a Silicon Graphics Integrated Raster Imaging System (IRIS) 4D/70 GT computer. Through the use of an interactive display builder program, SES, cupola display pages consisting of two dimensional and three dimensional graphics are constructed. These display pages interact with the SES via the IRIS real-time graphics interface. The focus is on the real-time graphics interface applications software developed on the IRIS.
Status of DSMT research program
NASA Technical Reports Server (NTRS)
Mcgowan, Paul E.; Javeed, Mehzad; Edighoffer, Harold H.
1991-01-01
The status of the Dynamic Scale Model Technology (DSMT) research program is presented. DSMT is developing scale model technology for large space structures as part of the Control Structure Interaction (CSI) program at NASA Langley Research Center (LaRC). Under DSMT a hybrid-scale structural dynamics model of Space Station Freedom was developed. Space Station Freedom was selected as the focus structure for DSMT since the station represents the first opportunity to obtain flight data on a complex, three-dimensional space structure. Included is an overview of DSMT including the development of the space station scale model and the resulting hardware. Scaling technology was developed for this model to achieve a ground test article which existing test facilities can accommodate while employing realistically scaled hardware. The model was designed and fabricated by the Lockheed Missile and Space Co., and is assembled at LaRc for dynamic testing. Also, results from ground tests and analyses of the various model components are presented along with plans for future subassembly and matted model tests. Finally, utilization of the scale model for enhancing analysis verification of the full-scale space station is also considered.
2009-07-27
S127-E-009322 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Information management in an integrated space telerobot
NASA Technical Reports Server (NTRS)
Dipippo, S.; Pasquariello, G.; Labini, G. Sylos
1989-01-01
The in-orbit operations, like space structures inspection, servicing and repairing, is expected to be one of the most significant technological area for application and development of Robotics and Automation in Space Station environment. The Italian National Space Plan (PSN) has started up its strategic programme SPIDER (Space Inspection Device for Extravehicular Repairs), which is scheduled in three phases, with the final goal of performing docking and precision repairing in the Space Station environment. SPIDER system is an autonomous integrated space robot, using mature Artificial Intelligence tools and technics for its operational control. The preliminary results of a study on the information architecture of the spacecraft are described.
2009-03-15
CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Center Director Bob Cabana (with microphone) congratulates the mission management team after the successful launch of space shuttle Discovery on the STS-119 mission. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
Samsa, M.
1980-01-01
An important effort is the Satellite Power System (SPS) comparative Assessment is the selection and characterization of alternative technologies to be compared with the SPS concept. The ground rules, criteria, and screening procedure applied in the selection of those alternative technologies are summarized. The final set of central station alternatives selected for comparison with the SPS concept includes: (1) light water reactor with improved fuel utilization, (2) conventional coal combustion with improved environmental controls, (3) open cycle gas turbine with integral low Btu gasifier, (4) terrestrial photovoltaic, (5) liquid metal fast breeder reactor, and (6) magnetic confinement fusion.
STS-92 MS Wakata gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Mission Specialist Koichi Wakata of Japan gets a final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Wakata and the rest of the crew are making the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
STS-92 Pilot Melroy gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Pilot Pamela Ann Melroy has a final check on her launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Melroy and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
2000-10-11
STS-92 Mission Specialist Koichi Wakata of Japan gets a final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Wakata and the rest of the crew are making the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
STS-92 MS McArthur gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Mission Specialist William S. McArthur Jr. undergoes final suit check in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. McArthur and the rest of the crew are making the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
STS-92 Commander Duffy gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Commander Brian Duffy is helped with final suit check in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Duffy and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
2000-10-11
STS-92 Mission Specialist Michael E. Lopez-Alegria gets a final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Lopez-Alegria and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
STS-92 MS Lopez-Alegria gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Mission Specialist Michael E. Lopez-Alegria gets a final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Lopez-Alegria and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
2011-07-21
CAPE CANAVERAL, Fla. -- The Convoy Command Center vehicle is positioned on the Shuttle Landing Facility (SLF) at NASA's Kennedy Space Center in Florida awaiting the landing of space shuttle Atlantis. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Seen here is Chris Hasselbring, USA Operations Manager. Securing the space shuttle fleet's place in history, Atlantis marks the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Ben Smegelsky
Mission Analysis and Orbit Control of Interferometric Wheel Formation Flying
NASA Astrophysics Data System (ADS)
Fourcade, J.
Flying satellite in formation requires maintaining the specific relative geometry of the spacecraft with high precision. This requirement raises new problem of orbit control. This paper presents the results of the mission analysis of a low Earth observation system, the interferometric wheel, patented by CNES. This wheel is made up of three receiving spacecraft, which follow an emitting Earth observation radar satellite. The first part of this paper presents trades off which were performed to choose orbital elements of the formation flying which fulfils all constraints. The second part presents orbit positioning strategies including reconfiguration of the wheel to change its size. The last part describes the station keeping of the formation. Two kinds of constraints are imposed by the interferometric system : a constraint on the distance between the wheel and the radar satellite, and constraints on the distance between the wheel satellites. The first constraint is fulfilled with a classical chemical station keeping strategy. The second one is fulfilled using pure passive actuators. Due to the high stability of the relative eccentricity of the formation, only the relative semi major axis had to be controlled. Differential drag due to differential attitude motion was used to control relative altitude. An autonomous orbit controller was developed and tested. The final accuracy is a relative station keeping better than few meters for a wheel size of one kilometer.
NASA Technical Reports Server (NTRS)
Chen, I. Y.; Ungar, E. K.; Lee, D. Y.; Beckstrom, P. S.
1993-01-01
To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
Final Environmental Assessment- Air Traffic Control Tower and Fire Station Pope AFB, NC
2004-06-01
collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2004 2. REPORT TYPE 3. DATES COVERED 00-00...of undeveloped land are located east of the base. Pope AFB covers approximately 2,140 acres, of which 151 acres are owned by the Air Force. The...protection against decreased visibility and damage to animals, crops , vegetation, and buildings. 4 PM2.s = Particulate matter less than 2.5 microns in
2011-07-08
CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden congratulates the launch control team members following the successful launch of space shuttle Atlantis on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Kennedy Center Director Bob Cabana congratulates the launch control team members following the successful launch of space shuttle Atlantis on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach adjusts controls at his console during the countdown to the launch of space shuttle Atlantis on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
77 FR 76541 - Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-28
....; Pilgrim Nuclear Power Station AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... licensee), for operation of the Pilgrim Nuclear Power Station (Pilgrim), located in Plymouth, Massachusetts... Regarding Pilgrim Nuclear Power Station, Final Report- Appendices,'' published in July 2007 (ADAMS Accession...
Proposal for a remotely manned space station
NASA Technical Reports Server (NTRS)
Minsky, Marvin
1990-01-01
The United States is in trouble in space. The costs of the proposed Space Station Freedom have grown beyond reach, and the present design is obsolete. The trouble has come from imagining that there are only two alternatives: manned vs. unmanned. Both choices have led us into designs that do not appear to be practical. On one side, the United States simply does not possess the robotic technology needed to operate or assemble a sophisticated unmanned space station. On the other side, the manned designs that are now under way seem far too costly and dangerous, with all of its thousands of extravehicular activity (EVA) hours. More would be accomplished at far less cost by proceeding in a different way. The design of a space station made of modular, Erector Set-like parts is proposed which is to be assembled using earth-based remotely-controlled binary-tree telerobots. Earth-based workers could be trained to build the station in space using simulators. A small preassembled spacecraft would be launched with a few telerobots, and then, telerobots could be ferried into orbit along with stocks of additional parts. Trained terrestrial workers would remotely assemble a larger station, and materials for additional power and life support systems could be launched. Finally, human scientists and explorers could be sent to the space station. Other aspects of such a space station program are discussed.
NASA Technical Reports Server (NTRS)
Quirk, Kevin J.; Patawaran, Ferze D.; Nguyen, Danh H.; Lee, Clement G.; Nguyen, Huy
2011-01-01
A programmable oscillator is a frequency synthesizer with an output phase that tracks an arbitrary function. An offset, phase-locked loop circuit is used in combination with an error control feedback loop to precisely control the output phase of the oscillator. To down-convert the received signal, several stages of mixing may be employed with the compensation for the time-base distortion of the carrier occurring at any one of those stages. In the Goldstone Solar System Radar (GSSR), the compensation occurs in the mixing from an intermediate frequency (IF), whose value is dependent on the station and band, to a common IF used in the final stage of down-conversion to baseband. The programmable oscillator (PO) is used in the final stage of down-conversion to generate the IF, along with a time-varying phase component that matches the time-base distortion of the carrier, thus removing it from the final down-converted signal.
2010-03-01
FINAL ENVIRONMENTAL ASSESSMENT ADDRESSING CONSTRUCTION OF A NEW CIVIL ENGINEERING WORKSHOP AT BELLOWS AIR FORCE STATION , O‘AHU, HAWAI‘I...Minimize impacts on other Bellows AFS functions and environmental resources This alternative would be located in an area located near Building 546 and...Preparation of An Environmental Assessment for the Proposed Construction of New Civil Engineering Workshop at Bellows Air !Force Station Thank you
47 CFR 97.109 - Station control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...
47 CFR 97.109 - Station control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...
47 CFR 97.109 - Station control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...
47 CFR 97.109 - Station control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...
NASA Technical Reports Server (NTRS)
1973-01-01
Configuration data and design information for a Delta 2914 launched configuration with greatly enhanced telecommunication service over the Part I Delta 2914 configuration is contained. The overall system definition, operations and control, and telecommunication service system, including link budgets are discussed. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beemer, J.D.; Parsons, R.R.; Rueter, L.L.
1975-02-01
An engineering analysis and development effort has been executed to design a superpressure airship, POBAL-S, capable of station keeping at an altitude of 21 kilometers for a duration of 7 days while supporting a payload weighing 890 Newtons and requiring 500 watts of electrical power. A detailed parametric trade-off between various power sources and other design choices was performed. The computer program used to accomplish this analysis is described and many results are presented. The system concept which resulted was a fuel cell powered, propeller driven airship controlled by an on-board autopilot with basic commands telemetered from a ground controlmore » station. Design of the balloon, power train, gimbaled propeller assembly, and electronic/electrical systems is presented. Flight operations for launch and recovery are discussed.« less
NASA Astrophysics Data System (ADS)
Gress, O.; Astapov, I.; Budnev, N.; Bezyazeekov, P.; Bogdanov, A.; Boreyko, V.; Brückner, M.; Chiavassa, A.; Chvalaev, O.; Dyachok, A.; Gress, T.; Epimakhov, S.; Fedoseev, E.; Gafarov, A.; Gorbunov, N.; Grebenyuk, V.; Grinuk, A.; Grishin, O.; Horns, D.; Ivanova, A.; Kalinin, A.; Karpov, N.; Kalmykov, N.; Kazarina, Yu.; Kirichkov, N.; Kiryuhin, S.; Kokoulin, R.; Komponiest, K.; Korosteleva, E.; Kozhin, V.; Kunnas, M.; Kuzmichev, L.; Lenok, V.; Lubsandorzhiev, B.; Lubsandorzhiev, N.; Mirgazov, R.; Mirzoyan, R.; Monkhoev, R.; Nachtigall, R.; Pakhorukov, A.; Panasyuk, M.; Pankov, L.; Petrukhin, A.; Platonov, V.; Poleschuk, V.; Popova, E.; Porelli, A.; Prosin, V.; Rubtsov, G.; Pushnin, A.; Samoliga, V.; Saunkin, A.; Semeney, Yu.; Shaibonov(ju), B.; Silaev, A.; Silaev(ju), A.; Skurikhin, A.; Slucka, V.; Spiering, C.; Sveshnikova, L.; Tabolenko, V.; Tarashchansky, B.; Tkachenko, A.; Tkachev, L.; Tluczykont, M.; Voronin, D.; Wischnewski, R.; Zagorodnikov, A.; Zurbanov, V.; Yashin, I.
2017-02-01
The new TAIGA-HiSCORE non-imaging Cherenkov array aims to detect air showers induced by gamma rays above 30 TeV and to study cosmic rays above 100 TeV. TAIGA-HiSCORE is made of integrating air Cherenkov detector stations with a wide field of view (0.6 sr), placed at a distance of about 100 m. They cover an area of initially ∼0.25 km2 (prototype array), and of ∼5 km2 at the final phase of the experiment. Each station includes 4 PMTs with 20 or 25 cm diameter, equipped with light guides shaped as Winstone cones. We describe the design, specifications of the read-out, DAQ and control and monitoring systems of the array. The present 28 detector stations of the TAIGA-HiSCORE engineering setup are in operation since September 2015.
2001-08-05
KENNEDY SPACE CENTER, Fla. -- Two members of the Expedition Three crew arrive at Kennedy Space Center’s Shuttle Landing Facility to make final preparations before launch of STS-105. At left is Commander Frank Culbertson, who piloted the T-38 in the background with his passenger cosmonaut Mikhail Tyurin (right). The Shuttle crew comprises commander Scott Horowitz, Pilot Rick Sturckow and Mission Specialists Daniel Barry and Patrick Forrester. On mission STS-105, Discovery will be transporting the Expedition Three crew and several payloads and scientific experiments to the International Space Station. The Early Ammonia Servicer (EAS) tank, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch of Discovery on mission STS-105 is scheduled for Aug. 9, 2001
2011-07-07
NASA Administrator Charles Bolden, right, participates in the post launch traditional beans and cornbread at the NASA Kennedy Space Center, Launch Control Center (LCC) shortly after the space shuttle Atlantis, STS-135, launched on Friday, July 8, 2011, in Cape Canaveral, Fla. The launch of Atlantis is the final flight of the shuttle program, a 12-day mission to the International Space Station. Photo Credit: (NASA/Bill Ingalls)
NASA Technical Reports Server (NTRS)
Kovalkeski, Scott D.; Patterson, Michael J.; Soulas, George C.
2001-01-01
Charge control on the International Space Station (ISS) is currently being provided by two plasma contactor units (PCUs). The plasma contactor includes a hollow cathode assembly (HCA), power processing unit and Xe gas feed system. The hollow cathode assemblies in use in the ISS plasma contactors were designed and fabricated at the NASA Glenn Research Center. Prequalification testing of development HCAs as well as acceptance testing of the flight HCAs is presented. Integration of the HCAs into the Boeing North America built PCU and acceptance testing of the PCU are summarized in this paper. Finally, data from the two on-orbit PCUs is presented.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009342 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009315 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009312 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009317 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009329 (27 July 2009) --- Astronauts Christopher Cassidy and Tom Marshburn (partially out of frame at left), both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009323 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009303 (27 July 2009) --- Astronaut Tom Marshburn, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and astronaut Christopher Cassidy (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009363 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009372 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
ISS020-E-025085 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of ?get ahead? tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009248 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009347 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009371 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-03-15
CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Flow Director for space shuttle Discovery Stephanie Stilson (center) and Shuttle Launch Director Mike Leinbach applaud the mission management team for the successful launch of space shuttle Discovery on the STS-119 mission. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
Space station needs, attributes and architectural options study. Final executive review
NASA Technical Reports Server (NTRS)
1983-01-01
Identification and validation of missions, the benefits of manned presence in space, attributes and architectures, space station requirements, orbit selection, space station architectural options, technology selection, and program planning are addressed.
Automation of closed environments in space for human comfort and safety
NASA Technical Reports Server (NTRS)
1990-01-01
The results are presented of the first year of a three year project on the automation of the Environmental Control and Life Support System (ECLSS) of the Space Station Freedom (SSF). The results are applicable to other future space mission. The work was done by the Kansas State University NASA/USRA interdisciplinary student design team. The six ECLSS subsystems and how they interact are discussed. Proposed control schemes and their rationale are discussed for the Atmosphere Revitalization (AR) subsystem. Finally, a description of the mathematical models for many components of the ECLSS control system is given.
STS-96 Mission Highlights. Part 2
NASA Technical Reports Server (NTRS)
1999-01-01
In this second part of a three-part video mission-highlights set, on-orbit spacecrew activities performed on the STS-96 Space Shuttle Orbiter Discovery and the International Space Station are reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This second part in the mission series features video from Flight Day 4-7 (FD 4-7). FD 4 of STS-96 presents astronauts Tammy Jernigan and Dan Barry completing the second longest space walk in shuttle history. Footage includes Jernigan and Barry transferring and installing two cranes from the shuttle's payload bay to locations on the outside of the station. The astronauts enter the International Space Station delivering supplies and prepare the outpost to receive its first resident crew, scheduled to arrive in early 2000 on FD 5. The video also captures the crew involved in logistics transfer activities within the Discovery/ISS orbiting complex. FD 6 includes footage of Valery Tokarev and Canadian astronaut Julie Payette charging out the final six battery recharge controller units for two of Zarya's power-producing batteries and all crew members' involvement in logistics transfer activities from the SPACEHAB module to designated locations in the International Space Station. With the transfer work of FD 6 all but complete, the astronauts conduct some additional work, installing parts of a wireless strain gauge system that will help engineers track the effects of adding modules to the station throughout its assembly. Moving the few remaining items from Discovery to the ISS, then closing a series of hatches within the station's modules leading back to the shuttle are the primary activities contained in FD 7. Final coverage features Discovery's astronauts finishing their work inside the International Space Station, closing all of the hatches and readying the shuttle's small thrusters to be fired to raise the entire complex's orbit in preparation for the undocking and departure set for FD 8.
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
STS-108 Mission Specialist Daniel M. Tani final suit checkout
NASA Technical Reports Server (NTRS)
2001-01-01
STS-108 Mission Specialist Daniel M. Tani final suit checkout KSC-01PD-1717 KENNEDY SPACE CENTER, Fla. - STS-108 Mission Specialist Daniel M. Tani waves as he undergoes final suit check before launch on Nov. 29. Top priorities for the STS-108 (UF-1) mission of Endeavour are rotation of the International Space Station Expedition Three and Expedition Four crews; bringing water, equipment and supplies to the station in the Multi-Purpose Logistics Module Raffaello; and completion of robotics tasks and a spacewalk to install thermal blankets over two pieces of equipment at the bases of the Space Station's solar wings. Liftoff is scheduled for 7:41 p.m. EST.
STS-108 Mission Specialist Linda A. Godwin final suit checkout
NASA Technical Reports Server (NTRS)
2001-01-01
STS-108 Mission Specialist Linda A. Godwin final suit checkout KSC-01PD-1720 KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Linda A. Godwin undergoes final suit check before launch on mission STS-108 Nov. 29. Top priorities for the STS-108 (UF-1) mission of Endeavour are rotation of the International Space Station Expedition Three and Expedition Four crews; bringing water, equipment and supplies to the station in the Multi-Purpose Logistics Module Raffaello; and completion of robotics tasks and a spacewalk to install thermal blankets over two pieces of equipment at the bases of the Space Station's solar wings. Liftoff is scheduled for 7:41 p.m. EST.
2011-07-08
CAPE CANAVERAL, Fla. -- Launch controllers wave their STS-135 shuttle launch team member flags and cheer in Firing Room 4 of the Launch Control Center following the successful launch of space shuttle Atlantis from NASA's Kennedy Space Center in Florida. In the foreground, from left, are NASA Test Directors Steve Payne and Bob Holl; Landing and Recovery Director Greg Gaddis; Shuttle Launch Director Mike Leinbach; Atlantis' NASA Flow Director Angie Brewer; NASA Test Director Charlie Blackwell-Thompson; STS-135 Launch Commentator George Diller; NASA Test Directors Jeremy Graeber, Tim Potter, and Jeff Spaulding; Orbiter Test Conductor Roberta Wyrick; Assistant Orbiter Test Conductor Laurie Sally; Assistant Launch Director Pete Nickolenko; United Space Alliance Vice President of Launch and Recovery Systems Mark Nappi; and United Space Alliance Test Conductor Mark Paxton. Atlantis began its final flight, the STS-135 mission to the International Space Station, at 11:29 a.m. EDT on July 8. STS-135 will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also is flying the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
Maag, Carl R.; Deshpande, Sunil P.; Johnson, Nicholas L.
1997-01-01
A flight experiment flown onboard the Mir space station as a part of the Euromir 95 mission is considered. The aim of the experiment was to develop a greater understanding of the effects of the space environment on materials. In addition to the active enumeration of particle impacts and trajectories, the aim was to capture hypervelocity particles for their return to earth. Postflight measurements were performed to determine the flux density, diameters and subsequent effects on various optical thermal control and structural materials. Sensors actively measured the atomic oxygen flux, the contamination depostion and their effects during the mission. Two clouds of small particles were detected during a period of 100 days onboard Mir. It is concluded that the measured momenta of these particles suggests that their size and velocity are such that they cause damage to optics and thermal control surfaces.
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Florida middle school students and their teachers greet students from other locations via webex before the start of the Zero Robotics finals competition. The Florida teams are at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2009-03-15
CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, from left, Steve Stich, manager of the Kennedy Orbiter Project Office; John Fraser, with Boeing Co. at the Marshall Space Flight Center; Rick Russell, with the NASA Orbiter Sustaining Engineering Office; and Rene Ortega with Marshall Space Flight Center's Shuttle Propulsion Office, are presented with a plaque for their work on the fuel control valve problem on space shuttle Discovery. The award was presented after the successful launch of Discovery on the STS-119 mission. Liftoff was on time at 7:43 p. m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2011-06-01
CAPE CANAVERAL, Fla. -- Xenon lights illuminate space shuttle Endeavour's unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Heat from the shuttle's auxiliary power units (APUs), which provide hydraulic control, can be seen at the back of Endeavour, near the vertical tail. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kenny Allen
2011-06-01
CAPE CANAVERAL, Fla. -- Heat from space shuttle Endeavour's auxiliary power units (APUs), which provide hydraulic control, can be seen at the back of the shuttle, near the vertical tail. Endeavour landed for the final time on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida, marking the 25th night landing of the Space Shuttle Program. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kenny Allen
2011-06-01
CAPE CANAVERAL, Fla. -- Heat from space shuttle Endeavour's auxiliary power units (APUs), which provide hydraulic control, can be seen at the back of the shuttle, near the vertical tail. Endeavour landed for the final time on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida, marking the 25th night landing of the Space Shuttle Program. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kenny Allen
2011-06-01
CAPE CANAVERAL, Fla. -- Heat from space shuttle Endeavour's auxiliary power units (APUs), which provide hydraulic control, can be seen at the back of the shuttle, near the vertical tail. Endeavour landed for the final time on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida, marking the 25th night landing of the Space Shuttle Program. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Tom Farrar
Characterization of an In-Situ Ground Terminal via a Geostationary Satellite
NASA Technical Reports Server (NTRS)
Piasecki, Marie T.; Welch, Bryan W.; Mueller, Carl H.
2015-01-01
In 2015, the Space Communications and Navigation (SCaN) Testbed project completed an S-Band ground station located at the NASA Glenn Research Center in Cleveland, Ohio. This S-Band ground station was developed to create a fully characterized and controllable dynamic link environment when testing novel communication techniques for Software Defined Radios and Cognitive Communication Systems. In order to provide a useful environment for potential experimenters, it was necessary to characterize various RF devices at both the component level in the laboratory and at the system level after integration. This paper will discuss some of the laboratory testing of the ground station components, with a particular focus/emphasis on the near-field measurements of the antenna. It will then describe the methodology for characterizing the installed ground station at the system level via a Tracking and Data Relay Satellite (TDRS), with specific focus given to the characterization of the ground station antenna pattern, where the max TDRS transmit power limited the validity of the non-noise floor received power data to the antenna main lobe region. Finally, the paper compares the results of each test as well as provides lessons learned from this type of testing methodology.
Characterization of an In-Situ Ground Terminal via a Geostationary Satellite
NASA Technical Reports Server (NTRS)
Piasecki, Marie; Welch, Bryan; Mueller, Carl
2015-01-01
In 2015, the Space Communications and Navigation (SCaN) Testbed project completed an S-Band ground station located at the NASA Glenn Research Center in Cleveland, Ohio. This S-Band ground station was developed to create a fully characterized and controllable dynamic link environment when testing novel communication techniques for Software Defined Radios and Cognitive Communication Systems. In order to provide a useful environment for potential experimenters, it was necessary to characterize various RF devices at both the component level in the laboratory and at the system level after integration. This paper will discuss some of the laboratory testing of the ground station components, with a particular focus emphasis on the near-field measurements of the antenna. It will then describe the methodology for characterizing the installed ground station at the system level via a Tracking and Data Relay Satellite (TDRS), with specific focus given to the characterization of the ground station antenna pattern, where the max TDRS transmit power limited the validity of the non-noise floor received power data to the antenna main lobe region. Finally, the paper compares the results of each test as well as provides lessons learned from this type of testing methodology.
Space station final study report. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1987-01-01
Volume 1 of the Final Study Report provides an Executive Summary of the Phase B study effort conducted under contract NAS8-36526. Space station Phase B implementation resulted in the timely establishment of preliminary design tasks, including trades and analyses. A comprehensive summary of project activities in conducting this study effort is included.
47 CFR 90.249 - Control stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Control stations. 90.249 Section 90.249... MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.249 Control stations. Control... following: (a) Frequencies for control stations. (1) Control stations may be authorized to operate on...
47 CFR 90.249 - Control stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Control stations. 90.249 Section 90.249... MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.249 Control stations. Control... following: (a) Frequencies for control stations. (1) Control stations may be authorized to operate on...
47 CFR 90.249 - Control stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Control stations. 90.249 Section 90.249... MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.249 Control stations. Control... following: (a) Frequencies for control stations. (1) Control stations may be authorized to operate on...
47 CFR 90.249 - Control stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Control stations. 90.249 Section 90.249... MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.249 Control stations. Control... following: (a) Frequencies for control stations. (1) Control stations may be authorized to operate on...
47 CFR 80.71 - Operating controls for stations on land.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operating controls for stations on land. 80.71... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Land Stations § 80.71 Operating controls for stations on land. Each coast station, Alaska-public fixed station...
ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned
NASA Technical Reports Server (NTRS)
Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David
2000-01-01
The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground stations successfully demonstrated many services and applications at Ka-band in three different modes of operation: circuit switched TDMA using the satellite on-board processor, satellite switched SS-TDMA applications using the on-board Microwave Switch Matrix (MSM), and conventional transponder (bent-pipe) operation. Data rates ranged from 4.8 kbps up to 622 Mbps. Experiments included: 1) low rate (4.8- 1 00's kbps) remote data acquisition and control using small earth stations, 2) moderate rate (1-45 Mbps) experiments included full duplex voice and video conferencing and both full duplex and asymmetric data rate protocol and network evaluation using mid-size ground stations, and 3) link characterization experiments and high data rate (155-622 Mbps) terrestrial and satellite interoperability application experiments conducted by a consortium of experimenters using the large transportable ground stations.
NASA Astrophysics Data System (ADS)
Modiri, Ehsan; Modiri, Sadegh
2015-04-01
Climatic hazards have complex nature that many of them are beyond human control. Earth's climate is constantly fluctuating and trying to balance itself. More than 75% of Iran has arid and semi-arid climate thus assessment of climate change induced threats and vulnerabilities is essential. In order to investigate the reason for the changes in amount and trend of precipitation parameter, 17 synoptic stations have been selected in the interval of the establishment time of the station until 2013. These stations are located in three regions: Northern, Razavi and Southern Khorasan. For quality control of data in Monthly, quarterly and annual total precipitation of data were tested and checked by run test. Then probable trends in each of the areas was assessed by Kendall-tau test. Total annual precipitation of each station is the important factor that increase the sensitivity of vulnerability in the area with low rainfall. Annual amount of precipitation moving from north to south has been declining, though in different fields that they have different geomorphologic characteristics controversies occur. But clearly can be observed average of precipitation decline with decreasing latitude. There were positive trends in the annual precipitation in 6 stations, negative trends in 10 stations, as well as one station, has no trend. The remarkable notice is that all stations have a positive trend were in the northern region in the case study. These stations had been in ranging from none to Moderate classification of threats and vulnerability. After the initialization parameters to classify levels of risks and vulnerability, the two measures of mean annual precipitation and the trends of this fluctuation were combined together. This classification was created in five level for stations. Accordingly Golmakan, Ghochan, Torbate heydarieh, Bojnord and Mashhad were in none threat level. Khoor of Birjand and Boshruyeh have had complete stage of the threat level and had the greatest meteorological perspective risk. Finally, after determining the degree of threats, meteorological vulnerability zoning map was produced by kriging interpolation method and utilizing geographic information systems (GIS). It showed most studied areas were in complete level of investigation. Keywords: Vulnerability, Climate threats, GIS, Zoning, Precipitation, Crisis management.
47 CFR 80.80 - Operating controls for ship stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...
47 CFR 80.80 - Operating controls for ship stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...
47 CFR 80.80 - Operating controls for ship stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...
47 CFR 80.80 - Operating controls for ship stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...
STS-92 MS Wisoff gets suit checked in the White Room before launch
NASA Technical Reports Server (NTRS)
2000-01-01
STS-92 Mission Specialist Peter J.K. '''Jeff''' Wisoff reaches out to shake the hand of Danny Wyatt, KSC NASA Quality Assurance specialist, after completing final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Wisoff and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery's landing is expected Oct. 22 at 2:10 p.m. EDT.
2000-10-11
STS-92 Mission Specialist Peter J.K. “Jeff” Wisoff reaches out to shake the hand of Danny Wyatt, KSC NASA Quality Assurance specialist, after completing final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Wisoff and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
2000-10-11
STS-92 Mission Specialist Peter J.K. “Jeff” Wisoff reaches out to shake the hand of Danny Wyatt, KSC NASA Quality Assurance specialist, after completing final check of his launch and entry suit in the White Room before entering Discovery. The White Room is an environmentally controlled area at the end of the Orbiter Access Arm that provides entry to the orbiter as well as emergency egress if needed. The arm remains in the extended position until 7 minutes 24 seconds before launch. Wisoff and the rest of the crew are undertaking the fifth flight to the International Space Station for construction. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. The mission includes four spacewalks for the construction activities. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT
2011-07-07
NASA Photographer Kim Shiflett, left, and Videographer Glenn Benson capture a group photo of the launch team in Firing Room Four of the NASA Kennedy Space Center Launch Control Center (LCC) shortly after the space shuttle Atlantis, STS-135, launched on Friday, July 8, 2011, in Cape Canaveral, Fla. The launch of Atlantis is the final flight of the shuttle program, a 12-day mission to the International Space Station. Photo Credit: (NASA/Bill Ingalls)
2011-07-21
CAPE CANAVERAL, Fla. -- The Convoy Command Center vehicle is positioned on the Shuttle Landing Facility (SLF) at NASA's Kennedy Space Center in Florida awaiting the landing of space shuttle Atlantis. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Accompanying the command convoy team are STS-135 Assistant Launch Director Pete Nickolenko (right), NASA astronaut Janet Kavandi and Chris Hasselbring, USA Operations Manager (left). Securing the space shuttle fleet's place in history, Atlantis marks the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Ben Smegelsky
2011-07-21
CAPE CANAVERAL, Fla. -- In the Flight Vehicle Support Building at NASA Kennedy Space Center's Shuttle Landing Facility (SLF), Mission Convoy Commander Tim Obrien strategies with NASA managers and convoy crew members during a prelanding meeting. A Convoy Command Center vehicle will be positioned near shuttle Atlantis on the SLF. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Securing the space shuttle fleet's place in history, Atlantis will mark the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- In the Flight Vehicle Support Building at NASA Kennedy Space Center's Shuttle Landing Facility (SLF), NASA Administrator Charles Bolden discusses strategies with NASA managers and convoy crew members during a prelanding convoy meeting. A Convoy Command Center vehicle will be positioned near shuttle Atlantis on the SLF. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Securing the space shuttle fleet's place in history, Atlantis will mark the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
OA-7 Final "Powered" Cargo Loading and Closeouts Banner Installation
2017-03-06
Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians perform final cargo and power installation in the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2008-0617] Nebraska Public Power District: Cooper Nuclear Station; Notice of Availability of the Final Supplement 41 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, Commission) has...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
....-- William C. Dale Power Station; Clark County, KY AGENCY: Environmental Protection Agency (EPA). ACTION... Station (Dale Station) located in Clark County, Kentucky. This Order constitutes a final action on the...
47 CFR 95.139 - Adding a small base station or a small control station.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Adding a small base station or a small control... base station or a small control station. (a) Except for a GMRS system licensed to a non-individual, one or more small base stations or a small control station may be added to a GMRS system at any point...
2011-07-08
CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach, and Payloads Launch Manager and Deputy Director of ISS and Spacecraft Processing at Kennedy, Bill Dowdell along with the launch control members, watch intently as space shuttle Atlantis lifts off on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
Dynamics of pollution-indicator and heterotrophic bacteria in sewage treatment lagoons.
Legendre, P; Baleux, B; Troussellier, M
1984-01-01
The spatio-temporal dynamics of pollution-indicator bacteria and aerobic heterotrophic bacteria were studied in the sewage treatment lagoons of an urban wastewater center after 26 months of biweekly sampling at eight stations in these lagoons. Robust statistical methods of time-series analysis were used to study successional steps (through chronological clustering) and rhythmic behavior through time (through contingency periodogram). The aerobic heterotrophic bacterial community showed two types of temporal evolution: in the first four stations, it seems mainly controlled by the nutrient support capacity of the sewage input, whereas in the remaining part of the lagoon, it seems likely that the pollution-indicator bacteria are gradually replaced by other bacterial types that are better adapted to this environment. On the other hand, the pollution-indicator bacteria showed an annual cycle which increased in amplitude at distances further from the wastewater source. The main events in this cycle were produced simultaneously at all stations, indicating control of these bacterial populations by climatic factors, which act through physical and chemical factors, and also through other biological components of this ecosystem (phytoplankton and zooplankton). Finally, we use results from this study to suggest a modified design for a future study program. Images PMID:6497372
Dynamics of pollution-indicator and heterotrophic bacteria in sewage treatment lagoons.
Legendre, P; Baleux, B; Troussellier, M
1984-09-01
The spatio-temporal dynamics of pollution-indicator bacteria and aerobic heterotrophic bacteria were studied in the sewage treatment lagoons of an urban wastewater center after 26 months of biweekly sampling at eight stations in these lagoons. Robust statistical methods of time-series analysis were used to study successional steps (through chronological clustering) and rhythmic behavior through time (through contingency periodogram). The aerobic heterotrophic bacterial community showed two types of temporal evolution: in the first four stations, it seems mainly controlled by the nutrient support capacity of the sewage input, whereas in the remaining part of the lagoon, it seems likely that the pollution-indicator bacteria are gradually replaced by other bacterial types that are better adapted to this environment. On the other hand, the pollution-indicator bacteria showed an annual cycle which increased in amplitude at distances further from the wastewater source. The main events in this cycle were produced simultaneously at all stations, indicating control of these bacterial populations by climatic factors, which act through physical and chemical factors, and also through other biological components of this ecosystem (phytoplankton and zooplankton). Finally, we use results from this study to suggest a modified design for a future study program.
NASA Technical Reports Server (NTRS)
1993-01-01
This report is the result of the Space Station Redesign Team's activity. Its purpose is to present without bias, and in appropriate detail, the characteristics and cost of three design and management approaches for the Space Station Freedom. It was presented to the Advisory Committee on the Redesign of the Space Station on 7 Jun. 1993, in Washington, D.C.
2000-12-21
NASA is issuing new regulations entitled "International Space Station Crew," to implement certain provisions of the International Space Station (ISS) Intergovernmental Agreement (IGA) regarding ISS crewmembers' observance of an ISS Code of Conduct.
2009-03-15
CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Flow Director for space shuttle Discovery Stephanie Stilson, Assistant Launch Director Pete Nickolenko and Shuttle Launch Director Mike Leinbach check the computers for follow-up images of the launch of space shuttle Discovery on the STS-119 mission. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Regulatory Commission (NRC) and the U.S. Army Corps of Engineers as a cooperating agency have published a... Licenses (COLs) at the South Texas Project Electric Generating Station Units 3 and 4: Final Report'' for the South Texas Project Electric Generating Station Units 3 and 4 COL application. The draft EIS was...
47 CFR 97.221 - Automatically controlled digital station.
Code of Federal Regulations, 2013 CFR
2013-10-01
... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2013-10-01 2013-10-01 false Automatically controlled digital station. 97...
47 CFR 97.221 - Automatically controlled digital station.
Code of Federal Regulations, 2012 CFR
2012-10-01
... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2012-10-01 2012-10-01 false Automatically controlled digital station. 97...
47 CFR 97.221 - Automatically controlled digital station.
Code of Federal Regulations, 2014 CFR
2014-10-01
... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2014-10-01 2014-10-01 false Automatically controlled digital station. 97...
47 CFR 97.221 - Automatically controlled digital station.
Code of Federal Regulations, 2011 CFR
2011-10-01
... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2011-10-01 2011-10-01 false Automatically controlled digital station. 97...
DOT National Transportation Integrated Search
2016-08-01
Public charging stations allow electric vehicle (EV) owners to have the ability and confidence to drive throughout New York State; for travel within and between metropolitan areas. Incorporating EV charging station planning into broader local and reg...
46 CFR 154.320 - Cargo control stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Arrangements § 154.320 Cargo control stations. (a) Cargo control stations must be above the weather deck. (b) If a cargo control station is in accommodation, service, or control spaces or has access to such a space, the station must: (1) Be a gas safe space; (2) Have an access to the space that meets § 154.330...
46 CFR 154.320 - Cargo control stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Arrangements § 154.320 Cargo control stations. (a) Cargo control stations must be above the weather deck. (b) If a cargo control station is in accommodation, service, or control spaces or has access to such a space, the station must: (1) Be a gas safe space; (2) Have an access to the space that meets § 154.330...
46 CFR 154.320 - Cargo control stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Arrangements § 154.320 Cargo control stations. (a) Cargo control stations must be above the weather deck. (b) If a cargo control station is in accommodation, service, or control spaces or has access to such a space, the station must: (1) Be a gas safe space; (2) Have an access to the space that meets § 154.330...
SMAC: A soft MAC to reduce control overhead and latency in CDMA-based AMI networks
Garlapati, Shravan; Kuruganti, Teja; Buehrer, Michael R.; ...
2015-10-26
The utilization of state-of-the-art 3G cellular CDMA technologies in a utility owned AMI network results in a large amount of control traffic relative to data traffic, increases the average packet delay and hence are not an appropriate choice for smart grid distribution applications. Like the CDG, we consider a utility owned cellular like CDMA network for smart grid distribution applications and classify the distribution smart grid data as scheduled data and random data. Also, we propose SMAC protocol, which changes its mode of operation based on the type of the data being collected to reduce the data collection latency andmore » control overhead when compared to 3G cellular CDMA2000 MAC. The reduction in the data collection latency and control overhead aids in increasing the number of smart meters served by a base station within the periodic data collection interval, which further reduces the number of base stations needed by a utility or reduces the bandwidth needed to collect data from all the smart meters. The reduction in the number of base stations and/or the reduction in the data transmission bandwidth reduces the CAPital EXpenditure (CAPEX) and OPerational EXpenditure (OPEX) of the AMI network. Finally, the proposed SMAC protocol is analyzed using markov chain, analytical expressions for average throughput and average packet delay are derived, and simulation results are also provided to verify the analysis.« less
Path planning and Ground Control Station simulator for UAV
NASA Astrophysics Data System (ADS)
Ajami, A.; Balmat, J.; Gauthier, J.-P.; Maillot, T.
In this paper we present a Universal and Interoperable Ground Control Station (UIGCS) simulator for fixed and rotary wing Unmanned Aerial Vehicles (UAVs), and all types of payloads. One of the major constraints is to operate and manage multiple legacy and future UAVs, taking into account the compliance with NATO Combined/Joint Services Operational Environment (STANAG 4586). Another purpose of the station is to assign the UAV a certain degree of autonomy, via autonomous planification/replanification strategies. The paper is organized as follows. In Section 2, we describe the non-linear models of the fixed and rotary wing UAVs that we use in the simulator. In Section 3, we describe the simulator architecture, which is based upon interacting modules programmed independently. This simulator is linked with an open source flight simulator, to simulate the video flow and the moving target in 3D. To conclude this part, we tackle briefly the problem of the Matlab/Simulink software connection (used to model the UAV's dynamic) with the simulation of the virtual environment. Section 5 deals with the control module of a flight path of the UAV. The control system is divided into four distinct hierarchical layers: flight path, navigation controller, autopilot and flight control surfaces controller. In the Section 6, we focus on the trajectory planification/replanification question for fixed wing UAV. Indeed, one of the goals of this work is to increase the autonomy of the UAV. We propose two types of algorithms, based upon 1) the methods of the tangent and 2) an original Lyapunov-type method. These algorithms allow either to join a fixed pattern or to track a moving target. Finally, Section 7 presents simulation results obtained on our simulator, concerning a rather complicated scenario of mission.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-07-01
This document is the final report of the solar energy heating and hot water system installed at the Kansas City Fire Station, Number 24, 2309 Hardesty Street, Kansas City, Missouri. The solar system was designed to provide 47 percent of the space heating, 8800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1428 cubic feet of 1/2 inch diameter pebbles weighing 71 1/2 tons, a DHW preheat tank, blowers, pumps, heatmore » exchangers, air ducting, controls and associated plumbing. Two 120-gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30-kilowatt electric unit heaters. There are six modes of system operation. This project is part of the Department of Energy PON-1 Solar Demonstration Program with DOE cost sharing $154,282 of the $174,372 solar system cost. The Final Design Review was held March 1977, the system became operational March 1979 and acceptance test was completed in September 1979.« less
Environmental Assessment for Buckley Air Force Base Air Traffic Control Tower and Fire Station
2003-05-01
Guard Base, Arapahoe County, Colorado, Colorado National Heritage Program, Colorado State University , Ft. Collins, CO, July 2000. COANG, 2000d. Final... Westcliffe Publishers, Inc, Englewood, CO, 1995. Hoogland, 1995. Hoogland, John L. The Black-Tailed Prairie Dog- Social Life of a Burrowing Mammal. The... University of Chicago Press. Chicago, IL, 1995. Hranac, 2002. Email: Utilities Information, from Civ 460/CES/CEV to Civ 460/CES/CEVP dated 16
2011-07-07
NASA Administrator Charles Bolden speaks to visitors at the NASA Kennedy Space Center Banana Creek viewing site prior to going to the Launch Control Center (LCC) for the planned launch of the space shuttle Atlantis from pad 39A on Friday, July 8, 2011, in Cape Canaveral, Fla. The launch of Atlantis, STS-135, is the final flight of the shuttle program, a 12-day mission to the International Space Station. Photo Credit: (NASA/Bill Ingalls)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garlapati, Shravan; Kuruganti, Teja; Buehrer, Michael R.
The utilization of state-of-the-art 3G cellular CDMA technologies in a utility owned AMI network results in a large amount of control traffic relative to data traffic, increases the average packet delay and hence are not an appropriate choice for smart grid distribution applications. Like the CDG, we consider a utility owned cellular like CDMA network for smart grid distribution applications and classify the distribution smart grid data as scheduled data and random data. Also, we propose SMAC protocol, which changes its mode of operation based on the type of the data being collected to reduce the data collection latency andmore » control overhead when compared to 3G cellular CDMA2000 MAC. The reduction in the data collection latency and control overhead aids in increasing the number of smart meters served by a base station within the periodic data collection interval, which further reduces the number of base stations needed by a utility or reduces the bandwidth needed to collect data from all the smart meters. The reduction in the number of base stations and/or the reduction in the data transmission bandwidth reduces the CAPital EXpenditure (CAPEX) and OPerational EXpenditure (OPEX) of the AMI network. Finally, the proposed SMAC protocol is analyzed using markov chain, analytical expressions for average throughput and average packet delay are derived, and simulation results are also provided to verify the analysis.« less
DOT National Transportation Integrated Search
2005-11-01
In order to extend commercial vehicle enforcement coverage to routes that are not monitored by fixed weigh stations, Kentucky has developed and implemented a Remote Monitoring System (RMS) and a Virtual Weight Station (VWS). The RMS captures images o...
Adaptive control applied to Space Station attitude control system
NASA Technical Reports Server (NTRS)
Lam, Quang M.; Chipman, Richard; Hu, Tsay-Hsin G.; Holmes, Eric B.; Sunkel, John
1992-01-01
This paper presents an adaptive control approach to enhance the performance of current attitude control system used by the Space Station Freedom. The proposed control law was developed based on the direct adaptive control or model reference adaptive control scheme. Performance comparisons, subject to inertia variation, of the adaptive controller and the fixed-gain linear quadratic regulator currently implemented for the Space Station are conducted. Both the fixed-gain and the adaptive gain controllers are able to maintain the Station stability for inertia variations of up to 35 percent. However, when a 50 percent inertia variation is applied to the Station, only the adaptive controller is able to maintain the Station attitude.
2011-07-06
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members sit at their consoles preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-06
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members sit at their consoles preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-06
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members sit at their consoles preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-06
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members sit at their consoles preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-06
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members sit at their consoles preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
Construction risk assessment of deep foundation pit in metro station based on G-COWA method
NASA Astrophysics Data System (ADS)
You, Weibao; Wang, Jianbo; Zhang, Wei; Liu, Fangmeng; Yang, Diying
2018-05-01
In order to get an accurate understanding of the construction safety of deep foundation pit in metro station and reduce the probability and loss of risk occurrence, a risk assessment method based on G-COWA is proposed. Firstly, relying on the specific engineering examples and the construction characteristics of deep foundation pit, an evaluation index system based on the five factors of “human, management, technology, material and environment” is established. Secondly, the C-OWA operator is introduced to realize the evaluation index empowerment and weaken the negative influence of expert subjective preference. The gray cluster analysis and fuzzy comprehensive evaluation method are combined to construct the construction risk assessment model of deep foundation pit, which can effectively solve the uncertainties. Finally, the model is applied to the actual project of deep foundation pit of Qingdao Metro North Station, determine its construction risk rating is “medium”, evaluate the model is feasible and reasonable. And then corresponding control measures are put forward and useful reference are provided.
NASA Astrophysics Data System (ADS)
Wang, Y.; Fang, D., VI; Xu, J.; Dong, Q.
2017-12-01
The Lancang-Mekong River is an important international river, cascaded hydropower stations development in which attracts the attention of downstream countries. In this paper, we proposed a coordination framework for water resources utilization on the interests of mutual compensation to relieve the conflict of upstream and downstream countries. Firstly, analyze the benefits and risks caused by the cascaded hydropower stations development and the evolution process of water resources use conflict between upstream and downstream countries. Secondly, evaluate the benefits and risks of flood control, water supply, navigation and power generation based on the energy theory of cascaded hydropower stations development in Lancang-Mekong River. Thirdly, multi-agent cooperation motivation and cooperation conditions between upstream and downstream countries in Lancang-Mekong River is given. Finally, the coordination framework for water resources utilization on the interests of mutual compensation in Lancang-Mekong River is presented. This coordination framework for water resources utilization can increase comprehensive benefits in Lancang-Mekong River.
Space station automation and robotics study. Operator-systems interface
NASA Technical Reports Server (NTRS)
1984-01-01
This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.
2011-07-06
CAPE CANAVERAL, Fla. -- In the Launch Control Center at NASA's Kennedy Space Center in Florida, Firing Room 3 is serene as launch team members gather at their consoles in Firing Room 4 preparing for space shuttle Atlantis' STS-135 mission to the International Space Station. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... effects that would result from use of stationing and training capacity, land use changes, and training... 4 stationing action; Alternative 5 land use change; and Alternative 4 training infrastructure... stationing package. Alternative 5 land use changes allow fixed sites (e.g., military bivouac), mission...
78 FR 45984 - Yankee Atomic Electric Company, Yankee Nuclear Power Station
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Electric Company, Yankee Nuclear Power Station AGENCY: Nuclear Regulatory Commission. ACTION: Environmental... (YAEC) is the holder of Possession-Only License DPR-3 for the Yankee Nuclear Power Station (YNPS... on the site of any nuclear power reactor. In its Statement of Considerations (SOC) for the Final Rule...
75 FR 1285 - Vehicle-Mounted Earth Stations (VMES)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... Earth Stations (VMES) AGENCY: Federal Communications Commission. ACTION: Final Rule; announcement of...-Mounted Earth Stations in Certain Frequency Bands Allocated to the Fixed-Satellite Service, IB Docket No...(i), 4(j), 7(a), 301, 303(c), 303(f), 303(g), 303(r), 303(y) and 308 of the Communications Act of...
Data transmission system with distributed microprocessors
Nambu, Shigeo
1985-01-01
A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-06
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272, 50-311, 50-354; NRC-2009-0390 and NRC-2009-0391] PSEG Nuclear, LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2; Notice of Availability of the Final Supplement 45 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Notice is...
Drift Recovery and Station Keeping for the CanX-4 & CanX-5 Nanosatellite Formation Flying Mission
NASA Astrophysics Data System (ADS)
Newman, Joshua Zachary
Canadian Advanced Nanospace eXperiments 4 & 5 (CanX-4&5) are a pair of formation flying nanosatellites that demonstrated autonomous sub-metre formation control at ranges of 1000 to 50 m. To facilitate the autonomous formation flight mission, it is necessary that the two spacecraft be brought within a few kilometres of one another, with a low relative velocity. Therefore, a system to calculate fuel-efficient recovery trajectories and produce the corresponding spacecraft commands was required. This system was also extended to provide station keeping capabilities. In this thesis, the overall drift recovery strategy is outlined, and the design of the controller is detailed. A method of putting the formation into a passively safe state, where the spacecraft cannot collide, is also presented. Monte-Carlo simulations are used to estimate the fuel losses associated with navigational and attitude errors. Finally, on-orbit results are presented, validating both the design and the error expectations.
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, at left, executive director of the Center for the Advancement of Science in Space, and NASA Kennedy Space Center Director Bob Cabana, visit with Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
STS-114 Flight Day 8 Highlights
NASA Technical Reports Server (NTRS)
2005-01-01
The major activities of Day 8 for the STS-114 crew of the Space Shuttle Discovery (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda) and the Expedition 11 crew of the International Space Station (ISS) (Commander Sergei Krikalev and NASA ISS Science Officer and Flight Engineer John Phillips) are a press conference and a conversation with President Bush. The two crews are interviewed by American, Japanese, and Russian media. Discovery crew members on the shuttle's mid-deck review paperwork regarding the impending extravehicular activity (EVA) to remove gap fillers from underneath the orbiter, and the Space Station Remote Manipulator System grapples the External Stowage Platform-2 in the Shuttle's payload bay. Finally, Mission control grants the shuttle crew some time off.
Applications technology satellites advanced mission study
NASA Technical Reports Server (NTRS)
Gould, L. M.
1972-01-01
Three spacecraft configurations were designed for operation as a high powered synchronous communications satellite. Each spacecraft includes a 1 kw TWT and a 2 kw Klystron power amplifier feeding an antenna with multiple shaped beams. One of the spacecraft is designed to be boosted by a Thor-Delta launch vehicle and raised to synchronous orbit with electric propulsion. The other two are inserted into a elliptical transfer orbit with an Atlas Centaur and injected into final orbit with an apogee kick motor. Advanced technologies employed in the several configurations include tubes with multiple stage collectors radiating directly to space, multiple-contoured beam antennas, high voltage rollout solar cell arrays with integral power conditioning, electric propulsion for orbit raising and on-station attitude control and station-keeping, and liquid metal slip rings.
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida beginning its final flight, the STS-134 mission, to the International Space Station. Launch was on time at 8:56 a.m. EDT on May 16. STS-134 and its six-member crew will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA
2011-05-16
CAPE CANAVERAL, Fla. -- Kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida beginning its final flight, the STS-134 mission, to the International Space Station. Launch was on time at 8:56 a.m. EDT on May 16. STS-134 and its six-member crew will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida beginning its final flight, the STS-134 mission, to the International Space Station. Launch was on time at 8:56 a.m. EDT on May 16. STS-134 and its six-member crew will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA
ATV GNC flight performance and lessons learned
NASA Astrophysics Data System (ADS)
Mongrard, O.; Cavrois, B.; Ankersen, F.; Dubois-Matra, O.; Zink, M.; Vergnol, A.; Piquemal, E.; Pionnier, G.; Southivong, U.
2018-06-01
ESA's fifth and final Automated Transfer Vehicle (ATV), Georges Lemaître, performed its fully automated rendezvous and docking with the International Space Station (ISS) on August 12, 2014. The ATV's navigation sensors have shown their worth docking the 20-ton vehicles with aft port of the Space Station, manoeuvring into position and docking with an excellent accuracy. For the second consecutive time after ATV-4, the accuracy at docking was such that the ATV probe head was directly captured inside the Zvezda docking mechanism without contact with the receiving cone. From 30 km and down to a distance of 250 m, ATV uses GPS (Global Positioning System) information from its own receiver and the Station's that is transmitted over a radiofrequency link. As it moves closer, ATV switches to laser navigation, using the reflection of laser pulses on reflectors mounted on the Space Station. This paper presents the achievements and performance of ATV GNC (Guidance, Navigation, and Control) across the 5 missions for both types of navigation. It will also discuss the observations made during the various flights regarding unforeseen conditions such as space environment or target pattern contamination having a potential impact on performance and how they were resolved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arca, V.J.; Blewett, W.K.; Kinne, W.E.
1996-10-01
The Rapid Response System (RRS) is a trailer-mounted facility for demilitarizing Chemical Agent Identification Sets (CAIS), obsolete training kits containing ampules and/or bottles of chemical warfare agents (mustard and lewisite), or other industrial chemical compounds. The main component of the RRS is a glovebox divided into three areas - an airlock station, unpack station, and neutralization station, and the CAIS items are processed through each station by use of 11 glove ports. The glovebox is maintained at negative pressure differential by a gas-particulate filter-blower unit. To measure the performance of the glovebox in containing chemical vapors/gases, a series of testsmore » was conducted on 811 April 1996 at Tooele Army Depot, UT, with methyl salicylate, a simulant for mustard. This testing addressed performance in steady state operation, airlock cycling, waste barrel changeout, and glove changeout. Two trials were also conducted in a simulated power-failure condition to determine the rate of leakage if system airflow is interrupted. The glovebox and its engineering controls provided a very high level of protection. Some procedural changes were recommended to increase the protection factor in glove and barrel changeout operations.« less
Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1981-01-01
The Automated Lamination Station is mechanically complete and is currently undergoing final wiring. The high current driver and isolator boards have been completed and installed, and the main interface board is under construction. The automated vacuum chamber has had a minor redesign to increase stiffness and improve the cover open/close mechanism. Design of the Final Assembly Station has been completed and construction is underway.
Automatic centring and bonding of lenses
NASA Astrophysics Data System (ADS)
Krey, Stefan; Heinisch, J.; Dumitrescu, E.
2007-05-01
We present an automatic bonding station which is able to center and bond individual lenses or doublets to a barrel with sub micron centring accuracy. The complete manufacturing cycle includes the glue dispensing and UV curing. During the process the state of centring is continuously controlled by the vision software, and the final result is recorded to a file for process statistics. Simple pass or fail results are displayed to the operator at the end of the process.
NASA Technical Reports Server (NTRS)
1972-01-01
A reference handbook of configuration data and design information is presented. It treats the overall system definition, operations and control, and telecommunication service system including link budgets. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form for easy reference.
2011-07-21
CAPE CANAVERAL, Fla. -- In the Flight Vehicle Support Building at NASA Kennedy Space Center's Shuttle Landing Facility (SLF), Kennedy Center Director Bob Cabana speaks with Closeout Crew lead Travis Thompson (left), and STS-135 Assistant Launch Director Pete Nickolenko during a prelanding convoy meeting. A Convoy Command Center vehicle will be positioned near shuttle Atlantis on the SLF. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Securing the space shuttle fleet's place in history, Atlantis will mark the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2010-05-21
ISS023-E-047827 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008906 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009312 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047841 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009074 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009283 (21 May 2010) --- NASA astronauts Michael Good (top center) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009246 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047842 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047855 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009253 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008866 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman (partially obscured), both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009255 (21 May 2010) --- NASA astronauts Michael Good (bottom center) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047864 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008863 (21 May 2010) --- NASA astronauts Garrett Reisman (right) and Michael Good, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009298 (21 May 2010) --- NASA astronauts Michael Good (partially obscured at left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047845 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047833 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008868 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman (partially obscured), both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-049791 (21 May 2010) --- NASA astronauts Garrett Reisman (bottom) and Michael Good, both STS-132 mission specialists, participate in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and Good completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009242 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047828 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
Space Station crew safety alternatives study. Volume 5: Space Station safety plan
NASA Technical Reports Server (NTRS)
Mead, G. H.; Peercy, R. L., Jr.; Raasch, R. F.
1985-01-01
The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.
Report on the Audit of the Morale, Welfare, and Recreation Fund, Bad Aibling Station, West Germany
1990-06-29
This is our final report on the Audit of the Morale, Welfare, and Recreation Fund (the Fund), Bad Aibling Station (the Station), West Germany. The...objectives of the audit were to determine whether the financial statements presented fairly the financial condition and results of operations of the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-07
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-528, 50-529, 50-530; NRC-2009-0012] Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of the Final Supplement 43... of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the...
Solar Dynamics Observatory Launch and Commissioning
NASA Technical Reports Server (NTRS)
O'Donnell, James R., Jr.; Kristin, D.; Bourkland, L.; Hsu, Oscar C.; Liu, Kuo-Chia; Mason, Paul A. C.; Morgenstern, Wendy M.; Russo, Angela M.; Starin, Scott R.; Vess, Melissa F.
2011-01-01
The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.
NASA Astrophysics Data System (ADS)
Capo-Lugo, Pedro A.
Formation flying consists of multiple spacecraft orbiting in a required configuration about a planet or through Space. The National Aeronautics and Space Administration (NASA) Benchmark Tetrahedron Constellation is one of the proposed constellations to be launched in the year 2009 and provides the motivation for this investigation. The problem that will be researched here consists of three stages. The first stage contains the deployment of the satellites; the second stage is the reconfiguration process to transfer the satellites through different specific sizes of the NASA benchmark problem; and, the third stage is the station-keeping procedure for the tetrahedron constellation. Every stage contains different control schemes and transfer procedures to obtain/maintain the proposed tetrahedron constellation. In the first stage, the deployment procedure will depend on a combination of two techniques in which impulsive maneuvers and a digital controller are used to deploy the satellites and to maintain the tetrahedron constellation at the following apogee point. The second stage that corresponds to the reconfiguration procedure shows a different control scheme in which the intelligent control systems are implemented to perform this procedure. In this research work, intelligent systems will eliminate the use of complex mathematical models and will reduce the computational time to perform different maneuvers. Finally, the station-keeping process, which is the third stage of this research problem, will be implemented with a two-level hierarchical control scheme to maintain the separation distance constraints of the NASA Benchmark Tetrahedron Constellation. For this station-keeping procedure, the system of equations defining the dynamics of a pair of satellites is transformed to take in account the perturbation due to the oblateness of the Earth and the disturbances due to solar pressure. The control procedures used in this research will be transformed from a continuous control system to a digital control system which will simplify the implementation into the computer onboard the satellite. In addition, this research will show an introductory chapter on attitude dynamics that can be used to maintain the orientation of the satellites, and an adaptive intelligent control scheme will be proposed to maintain the desired orientation of the spacecraft. In conclusion, a solution for the dynamics of the NASA Benchmark Tetrahedron Constellation will be presented in this research work. The main contribution of this work is the use of discrete control schemes, impulsive maneuvers, and intelligent control schemes that can be used to reduce the computational time in which these control schemes can be easily implemented in the computer onboard the satellite. These contributions are explained through the deployment, reconfiguration, and station-keeping process of the proposed NASA Benchmark Tetrahedron Constellation.
Rosenthal, Madelyn E; Castellvi, Antonio O; Goova, Mouza T; Hollett, Lisa A; Dale, Jarrod; Scott, Daniel J
2009-11-01
We previously reported a proficiency-based Fundamentals of Laparoscopic Surgery (FLS) curriculum that uniformly resulted in passing the technical skills certification criteria. We hypothesized that pretraining using the Southwestern (SW) videotrainer stations would decrease costs and training time and maintain benefits. Group I (2nd-year medical student, n = 10) underwent FLS pretesting (Pretest 1), SW station proficiency-based training, repeat FLS testing (Pretest 2), FLS proficiency-based training, and final FLS testing (Posttest). These data were compared with a historic control, group II (2nd-year medical student, n = 10), which underwent FLS pretesting (Pretest 1), proficiency-based training, and final FLS testing (Posttest). During training, group I achieved proficiency (85.4 + or - 26.2 repetitions) for all SW tasks. For both groups, proficiency was achieved for 96% of the FLS tasks, with substantial differences detected for group I and group II repetitions (100.5 + or - 15.9 versus 114 + or - 25.5) and training time (6.0 + or - 1.5 versus 9.2 + or - 2.2 hours), respectively. Per-person material costs were considerably different for groups I and II ($827 + or - 116 versus $1,108 + or - 393). Group I demonstrated significant improvement from Pretest 1 (149 + or - 39; 0% FLS pass rate) to Pretest 2 (293 + or - 83; p < 0.001; 60% FLS pass rate), and to Posttest (444 + or - 60; p < 0.001; 100% FLS pass rate). Group II demonstrated significant improvement from Pretest 1 (158 + or - 78; 0% FLS pass rate) to Posttest (469.7 + or - 12.0; p < 0.001; 100% FLS pass rate). Pretraining on SW stations decreases training time for FLS skill acquisition and maintains educational benefits. This strategy decreases costs associated with using consumable materials for training.
The flight telerobotic servicer Tinman concept: System design drivers and task analysis
NASA Technical Reports Server (NTRS)
Andary, J. F.; Hewitt, D. R.; Hinkal, S. W.
1989-01-01
A study was conducted to develop a preliminary definition of the Flight Telerobotic Servicer (FTS) that could be used to understand the operational concepts and scenarios for the FTS. Called the Tinman, this design concept was also used to begin the process of establishing resources and interfaces for the FTS on Space Station Freedom, the National Space Transportation System shuttle orbiter, and the Orbital Maneuvering vehicle. Starting with an analysis of the requirements and task capabilities as stated in the Phase B study requirements document, the study identified eight major design drivers for the FTS. Each of these design drivers and their impacts on the Tinman design concept are described. Next, the planning that is currently underway for providing resources for the FTS on Space Station Freedom is discussed, including up to 2000 W of peak power, up to four color video channels, and command and data rates up to 500 kbps between the telerobot and the control station. Finally, an example is presented to show how the Tinman design concept was used to analyze task scenarios and explore the operational capabilities of the FTS. A structured methodology using a standard terminology consistent with the NASA/National Bureau of Standards Standard Reference Model for Telerobot Control System Architecture (NASREM) was developed for this analysis.
Progress on control experiments of flexible structures
NASA Technical Reports Server (NTRS)
Juang, Jer-Nan
1990-01-01
Progress at the NASA Langley Research Center in the area of control experiments for flexible structures is described. First the author presents the experimental results for a linear model which represents slewing maneuvers of a generic space station solar panel carried out to evaluate experimentally some control technologies. Then the status of the rotational/translational maneuvering experiment of a flexible steel panel carried by a translation cart is presented. Finally, experimental results of the NASA minimast testbed using velocity command stepper motors as reaction mass reactors are shown. All the test configurations are briefly described, including actuator and sensor, test setup, and test software. The status of some research activities oriented primarily to the experimental methods for control of flexible structures is presented.
Modelling and simulation of Space Station Freedom berthing dynamics and control
NASA Technical Reports Server (NTRS)
Cooper, Paul A.; Garrison, James L., Jr.; Montgomery, Raymond C.; Wu, Shih-Chin; Stockwell, Alan E.; Demeo, Martha E.
1994-01-01
A large-angle, flexible, multibody, dynamic modeling capability has been developed to help validate numerical simulations of the dynamic motion and control forces which occur during berthing of Space Station Freedom to the Shuttle Orbiter in the early assembly flights. This paper outlines the dynamics and control of the station, the attached Shuttle Remote Manipulator System, and the orbiter. The simulation tool developed for the analysis is described and the results of two simulations are presented. The first is a simulated maneuver from a gravity-gradient attitude to a torque equilibrium attitude using the station reaction control jets. The second simulation is the berthing of the station to the orbiter with the station control moment gyros actively maintaining an estimated torque equilibrium attitude. The influence of the elastic dynamic behavior of the station and of the Remote Manipulator System on the attitude control of the station/orbiter system during each maneuver was investigated. The flexibility of the station and the arm were found to have only a minor influence on the attitude control of the system during the maneuvers.
H2FIRST Reference Station Design Task: Project Deliverable 2-2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pratt, Joseph; Terlip, Danny; Ainscough, Chris
2015-04-20
This report presents near-term station cost results and discusses cost trends of different station types. It compares various vehicle rollout scenarios and projects realistic near-term station utilization values using the station infrastructure rollout in California as an example. It describes near-term market demands and matches those to cost-effective station concepts. Finally, the report contains detailed designs for five selected stations, which include piping and instrumentation diagrams, bills of materials, and several site-specific layout studies that incorporate the setbacks required by NFPA 2, the National Fire Protection Association Hydrogen Technologies Code. This work identified those setbacks as a significant factor affectingmore » the ability to site a hydrogen station, particularly liquid stations at existing gasoline stations. For all station types, utilization has a large influence on the financial viability of the station.« less
International Space Station (ISS)
1994-09-21
Artist's concept of the final configuration of the International Space Station (ISS) Alpha. The ISS is a multidisciplinary laboratory, technology test bed, and observatory that will provide an unprecedented undertaking in scientific, technological, and international experimentation.
Space Station communications and tracking systems modeling and RF link simulation
NASA Technical Reports Server (NTRS)
Tsang, Chit-Sang; Chie, Chak M.; Lindsey, William C.
1986-01-01
In this final report, the effort spent on Space Station Communications and Tracking System Modeling and RF Link Simulation is described in detail. The effort is mainly divided into three parts: frequency division multiple access (FDMA) system simulation modeling and software implementation; a study on design and evaluation of a functional computerized RF link simulation/analysis system for Space Station; and a study on design and evaluation of simulation system architecture. This report documents the results of these studies. In addition, a separate User's Manual on Space Communications Simulation System (SCSS) (Version 1) documents the software developed for the Space Station FDMA communications system simulation. The final report, SCSS user's manual, and the software located in the NASA JSC system analysis division's VAX 750 computer together serve as the deliverables from LinCom for this project effort.
Elgowainy, Amgad; Reddi, Krishna; Lee, Dong-Yeon; ...
2017-10-16
In this study, we conducted a techno-economic and thermodynamic analysis of precooling units (PCUs) at hydrogen refueling stations and developed a cost-minimizing design algorithm for the PCU observing the SAE J2601 refueling protocol for T40 stations. In so doing, we identified major factors that affect PCU cost and energy use. The hydrogen precooling energy intensity depends strongly on the station utilization rate, but approaches 0.3 kWh e/kg-H 2 at full utilization. In early fuel cell electric vehicle markets where utilization of the refueling capacity is low, the overhead cooling load (to keep the heat exchanger cold at -40°C) results inmore » significantly high PCU energy intensity because only a small amount of hydrogen is being dispensed. We developed a parameterized precooling energy intensity prediction formula as a function of the ambient temperature and station utilization rate. We also found that the Joule-Thomson effect of the flow control device introduces a significant increase in temperature upstream of the PCU’s heat exchanger (HX), which impacts the PCU design capacity. An optimal PCU (per dispenser, at 35°C HX inlet temperature) consists of a 13-kW refrigerator and a HX with 1400 kg of thermal mass (aluminum), which currently costs $70,000 (uninstalled). Finally, the total (installed) capital and operation cost of PCU at a fully utilized hydrogen refueling station adds $0.50/kg-H 2.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elgowainy, Amgad; Reddi, Krishna; Lee, Dong-Yeon
In this study, we conducted a techno-economic and thermodynamic analysis of precooling units (PCUs) at hydrogen refueling stations and developed a cost-minimizing design algorithm for the PCU observing the SAE J2601 refueling protocol for T40 stations. In so doing, we identified major factors that affect PCU cost and energy use. The hydrogen precooling energy intensity depends strongly on the station utilization rate, but approaches 0.3 kWh e/kg-H 2 at full utilization. In early fuel cell electric vehicle markets where utilization of the refueling capacity is low, the overhead cooling load (to keep the heat exchanger cold at -40°C) results inmore » significantly high PCU energy intensity because only a small amount of hydrogen is being dispensed. We developed a parameterized precooling energy intensity prediction formula as a function of the ambient temperature and station utilization rate. We also found that the Joule-Thomson effect of the flow control device introduces a significant increase in temperature upstream of the PCU’s heat exchanger (HX), which impacts the PCU design capacity. An optimal PCU (per dispenser, at 35°C HX inlet temperature) consists of a 13-kW refrigerator and a HX with 1400 kg of thermal mass (aluminum), which currently costs $70,000 (uninstalled). Finally, the total (installed) capital and operation cost of PCU at a fully utilized hydrogen refueling station adds $0.50/kg-H 2.« less
NASA Astrophysics Data System (ADS)
Xiong, Zhi; Zhu, J. G.; Xue, B.; Ye, Sh. H.; Xiong, Y.
2013-10-01
As a novel network coordinate measurement system based on multi-directional positioning, workspace Measurement and Positioning System (wMPS) has outstanding advantages of good parallelism, wide measurement range and high measurement accuracy, which makes it to be the research hotspots and important development direction in the field of large-scale measurement. Since station deployment has a significant impact on the measurement range and accuracy, and also restricts the use-cost, the optimization method of station deployment was researched in this paper. Firstly, positioning error model was established. Then focusing on the small network consisted of three stations, the typical deployments and error distribution characteristics were studied. Finally, through measuring the simulated fuselage using typical deployments at the industrial spot and comparing the results with Laser Tracker, some conclusions are obtained. The comparison results show that under existing prototype conditions, I_3 typical deployment of which three stations are distributed in a straight line has an average error of 0.30 mm and the maximum error is 0.50 mm in the range of 12 m. Meanwhile, C_3 typical deployment of which three stations are uniformly distributed in the half-circumference of an circle has an average error of 0.17 mm and the maximum error is 0.28 mm. Obviously, C_3 typical deployment has a higher control effect on precision than I_3 type. The research work provides effective theoretical support for global measurement network optimization in the future work.
DETAIL INTERIOR VIEW OF CONTROL PANEL IN CONTROL STATION, VIEW ...
DETAIL INTERIOR VIEW OF CONTROL PANEL IN CONTROL STATION, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Control Station, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
3. VAL CONTROL STATION, VIEW OF CONTROL PANELS SHOWING MAIN ...
3. VAL CONTROL STATION, VIEW OF CONTROL PANELS SHOWING MAIN PRESSURE GAUGES, LOOKING NORTH. - Variable Angle Launcher Complex, Control Station, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA
30 CFR 77.309-1 - Control stations; location.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Control stations; location. 77.309-1 Section 77... MINES Thermal Dryers § 77.309-1 Control stations; location. Thermal dryer system control stations constructed after June 30, 1971, shall be installed at a location which will give to the operator of the...
47 CFR 25.119 - Assignment or transfer of control of station authorization.
Code of Federal Regulations, 2012 CFR
2012-10-01
... assignments and transfers of control of space station licenses to determine whether the initial license was... 47 Telecommunication 2 2012-10-01 2012-10-01 false Assignment or transfer of control of station... Requirements § 25.119 Assignment or transfer of control of station authorization. (a) You must file an...
47 CFR 25.119 - Assignment or transfer of control of station authorization.
Code of Federal Regulations, 2014 CFR
2014-10-01
... assignments and transfers of control of space station licenses to determine whether the initial license was... 47 Telecommunication 2 2014-10-01 2014-10-01 false Assignment or transfer of control of station... Requirements § 25.119 Assignment or transfer of control of station authorization. (a) You must file an...
47 CFR 25.119 - Assignment or transfer of control of station authorization.
Code of Federal Regulations, 2013 CFR
2013-10-01
... assignments and transfers of control of space station licenses to determine whether the initial license was... 47 Telecommunication 2 2013-10-01 2013-10-01 false Assignment or transfer of control of station... Requirements § 25.119 Assignment or transfer of control of station authorization. (a) You must file an...
47 CFR 25.119 - Assignment or transfer of control of station authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... assignments and transfers of control of space station licenses to determine whether the initial license was... 47 Telecommunication 2 2010-10-01 2010-10-01 false Assignment or transfer of control of station... Requirements § 25.119 Assignment or transfer of control of station authorization. (a) You must file an...
47 CFR 25.119 - Assignment or transfer of control of station authorization.
Code of Federal Regulations, 2011 CFR
2011-10-01
... assignments and transfers of control of space station licenses to determine whether the initial license was... 47 Telecommunication 2 2011-10-01 2011-10-01 false Assignment or transfer of control of station... Requirements § 25.119 Assignment or transfer of control of station authorization. (a) You must file an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...
Final report on the portable weather station.
DOT National Transportation Integrated Search
2010-03-01
This station was required to have air temperature, relative humidity, wind speed and direction, and : pavement temperature sensors of similar quality to the traditional RWIS sensors, have an integrated solar : powered battery system, and be trailer...
47 CFR 90.119 - Application requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...
47 CFR 90.119 - Application requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...
47 CFR 90.119 - Application requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...
47 CFR 90.119 - Application requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...
2005-08-31
to the launch complex is considered a hazardous operation. Transportation of fueled payloads will comply with AFSPCMAN 91 - 710 , Range Safety User...April. 45th Space Wing (SW). 1996b. Hazardous Materials Response Plan 32- 3 , Volume I, March. 45th Space Wing (SW). 2001. Integrated Natural...control number. 1. REPORT DATE 31 AUG 2005 2. REPORT TYPE 3 . DATES COVERED 00-00-2005 to 00-00-2005 4. TITLE AND SUBTITLE Final Environmental
SPX-8 Dragon Spacecraft Approach
2016-04-10
ISS047e052707 (04/10/2016) --- The SpaceX Dragon cargo spaceship begins the final approach to the International Space Station. The spacecraft is delivering about 7,000 pounds of science and research investigations, including the Bigelow Expandable Activity Module, known as BEAM. Dragon’s arrival marked the first time two commercial cargo vehicles have been docked simultaneously at the space station. Orbital ATK’s Cygnus spacecraft arrived to the station just over two weeks ago. With the arrival of Dragon, the space station ties the record for most vehicles on station at one time – six.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requests to assign rights granted by the authorization or to transfer control of entities holding... in the station's authorization or rules. Control station. A fixed station, the transmissions of which are used to control automatically the emissions or operations of a radio station, or a remote base...
The role of automation and artificial intelligence
NASA Astrophysics Data System (ADS)
Schappell, R. T.
1983-07-01
Consideration is given to emerging technologies that are not currently in common use, yet will be mature enough for implementation in a space station. Artificial intelligence (AI) will permit more autonomous operation and improve the man-machine interfaces. Technology goals include the development of expert systems, a natural language query system, automated planning systems, and AI image understanding systems. Intelligent robots and teleoperators will be needed, together with improved sensory systems for the robotics, housekeeping, vehicle control, and spacecraft housekeeping systems. Finally, NASA is developing the ROBSIM computer program to evaluate level of automation, perform parametric studies and error analyses, optimize trajectories and control systems, and assess AI technology.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... A regularly interacting group of base, mobile and associated control and fixed relay stations... qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are used to control...
Code of Federal Regulations, 2013 CFR
2013-10-01
.... A regularly interacting group of base, mobile and associated control and fixed relay stations... qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are used to control...
NASA Astrophysics Data System (ADS)
Gao, Qing; Liu, Jinguo; Tian, Tongtong; Li, Yangmin
2017-09-01
Space robots can perform some tasks in harsh environment as assistants of astronauts or substitutions of astronauts. Taking the limited working time and the arduous task of the astronauts in the space station into account, an astronaut assistant robot (AAR-2) applied in the space station is proposed and designed in this paper. The AAR-2 is achieved with some improvements on the basis of AAR-1 which was designed before. It can exploit its position and attitude sensors and control system to free flight or hover in the space cabin. And it also has a definite environmental awareness and artificial intelligence to complete some specified tasks under the control of astronauts or autonomously. In this paper, it mainly analyzes and controls the 6-DOF motion of the AAR-2. Firstly, the system configuration of AAR-2 is specifically described, and the movement principles are analyzed. Secondly, according to the physical model of the AAR-2, the Newton - Euler equation is applied in the preparation of space dynamics model of 6-DOF motion. Then, according to the mathematical model's characteristics which are nonlinear and strong coupling, a dual closed loop position and attitude controller based on fuzzy sliding mode control is proposed and designed. Finally, simulation experiments are appropriate to provide for AAR-2 control system by using Matlab/Simulink. From the simulation results it can be observed that the designed fuzzy sliding mode controller can control the 6-DOF motion of AAR-2 quickly and precisely.
Synthetic Minor NSR Permit: ConocoPhillips Company - Sunnyside Compressor Station
This page contains the response to public comments and the final synthetic minor NSR permit for the ConocoPhillips Company, Sunnyside Compressor Station, located on the Southern Ute Indian Reservation in La Plata County, CO.
Synthetic Minor NSR Permit: ConocoPhillips Company - Ute Compressor Station
This page contains the response to public comments and the final synthetic minor NSR permit for the ConocoPhillips Company, Ute Compressor Station, located on the Southern Ute Indian Reservation in La Plata County, CO.
Synthetic Minor NSR Permit: ConocoPhillips Company - Argenta Compressor Station
This page contains the response to public comments and the final synthetic minor NSR permit for the ConocoPhillips Company, Argenta Compressor Station, located on the Southern Ute Indian Reservation in La Plata County, CO.
2011-05-16
CAPE CANAVERAL, Fla. -- Kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida. Endeavour began its final flight, the STS-134 mission to the International Space Station, on time at 8:56 a.m. EDT on May 16. Endeavour and its six-member crew are embarking on a mission to deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire and kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida beginning its final flight, the STS-134 mission, to the International Space Station. Launch was on time at 8:56 a.m. EDT on May 16. STS-134 and its six-member crew will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire, space shuttle Endeavour soars skyward after lifting off Launch Pad 39A at NASA's Kennedy Space Center in Florida. Endeavour began its final flight, the STS-134 mission to the International Space Station, on time at 8:56 a.m. EDT on May 16. Endeavour and its six-member crew are embarking on a mission to deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller
2011-05-16
CAPE CANAVERAL, Fla. -- Kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from its seaside launch pad at NASA's Kennedy Space Center in Florida. Endeavour began its final flight, the STS-134 mission, to the International Space Station on time at 8:56 a.m. EDT on May 16. Endeavour and its six-member crew are embarking on a mission to deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jim Grossmann
2011-05-16
CAPE CANAVERAL, Fla. -- Media capture the launch of space shuttle Endeavour on the STS-134 mission to the International Space Station from the Press Site at NASA's Kennedy Space Center in Florida. The shuttle and its six-member crew lifted off on time at 8:56 a.m. EDT on May 16. STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-16
CAPE CANAVERAL, Fla. -- The American flag sways in the breeze as space shuttle Endeavour launches on the STS-134 mission to the International Space Station. The shuttle and its six-member crew lifted off from Launch Pad 39A at NASA's Kennedy Space Center in Florida on time at 8:56 a.m. EDT on May 16. STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire and kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from Launch Pad 39A at NASA's Kennedy Space Center in Florida beginning its final flight, the STS-134 mission, to the International Space Station. Launch was on time at 8:56 a.m. EDT on May 16. STS-134 and its six-member crew will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA
NASA Technical Reports Server (NTRS)
Rabenberg, Ellen; Kaukler, William; Grugel, Richard
2015-01-01
Two sets of epoxy mixtures, both containing the same ionic liquid (IL) based resin but utilizing two different curing agents, were evaluated after spending more than two years of continual space exposure outside of the International Space Station on the MISSE-8 sample rack. During this period the samples, positioned on nadir side, also experienced some 12,500 thermal cycles between approximately -40?C and +40 C. Initial examination showed some color change, a miniscule weight variance, and no cracks or de-bonding from the sample substrate. Microscopic examination of the surface reveled some slight deformities and pitting. These observations, and others, are discussed in view of the ground-based control samples. Finally, the impetus of this study in terms of space applications is presented.
Localization from Visual Landmarks on a Free-Flying Robot
NASA Technical Reports Server (NTRS)
Coltin, Brian; Fusco, Jesse; Moratto, Zack; Alexandrov, Oleg; Nakamura, Robert
2016-01-01
We present the localization approach for Astrobee,a new free-flying robot designed to navigate autonomously on board the International Space Station (ISS). Astrobee will conduct experiments in microgravity, as well as assisst astronauts and ground controllers. Astrobee replaces the SPHERES robots which currently operate on the ISS, which were limited to operating in a small cube since their localization system relied on triangulation from ultrasonic transmitters. Astrobee localizes with only monocular vision and an IMU, enabling it to traverse the entire US segment of the station. Features detected on a previously-built map, optical flow information,and IMU readings are all integrated into an extended Kalman filter (EKF) to estimate the robot pose. We introduce several modifications to the filter to make it more robust to noise.Finally, we extensively evaluate the behavior of the filter on atwo-dimensional testing surface.
49 CFR 236.814 - Station, control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Station, control. 236.814 Section 236.814..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.814 Station, control. The place where the control machine of a traffic control system is located. ...
49 CFR 236.814 - Station, control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Station, control. 236.814 Section 236.814..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.814 Station, control. The place where the control machine of a traffic control system is located. ...
49 CFR 236.814 - Station, control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Station, control. 236.814 Section 236.814..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.814 Station, control. The place where the control machine of a traffic control system is located. ...
49 CFR 236.814 - Station, control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Station, control. 236.814 Section 236.814..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.814 Station, control. The place where the control machine of a traffic control system is located. ...
Modeling, simulation and control for a cryogenic fluid management facility, preliminary report
NASA Technical Reports Server (NTRS)
Turner, Max A.; Vanbuskirk, P. D.
1986-01-01
The synthesis of a control system for a cryogenic fluid management facility was studied. The severe demand for reliability as well as instrumentation and control unique to the Space Station environment are prime considerations. Realizing that the effective control system depends heavily on quantitative description of the facility dynamics, a methodology for process identification and parameter estimation is postulated. A block diagram of the associated control system is also produced. Finally, an on-line adaptive control strategy is developed utilizing optimization of the velocity form control parameters (proportional gains, integration and derivative time constants) in appropriate difference equations for direct digital control. Of special concern are the communications, software and hardware supporting interaction between the ground and orbital systems. It is visualized that specialist in the OSI/ISO utilizing the Ada programming language will influence further development, testing and validation of the simplistic models presented here for adaptation to the actual flight environment.
77 FR 21593 - V. C. Summer Nuclear Station, Units 2 and 3 Combined Licenses and Record of Decision
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 052-00027 and 052-00028; NRC-2008-0441] V. C. Summer... Licenses for Virgil C. Summer Nuclear Station, Units 2 and 3'' ML11098A044 NUREG-1939, Vol 1, ``Final Environmental Impact Statement for Combined Licenses for Virgil C. Summer Nuclear Station, Units 2 and 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... Company D/B/A/ Dominion Virginia Power and Old Dominion Electric Cooperative, North Anna Power Station... combined license (COL) application to build and operate a new reactor at its North Anna Power Station (NAPS... Combined License (COL) for North Anna Power Station, Unit 3.'' A notice of availability of the final...
Space station automation study: Autonomous systems and assembly, volume 2
NASA Technical Reports Server (NTRS)
Bradford, K. Z.
1984-01-01
This final report, prepared by Martin Marietta Denver Aerospace, provides the technical results of their input to the Space Station Automation Study, the purpose of which is to develop informed technical guidance in the use of autonomous systems to implement space station functions, many of which can be programmed in advance and are well suited for automated systems.
2. VAL CONTROL STATION, VIEW OF INTERIOR SHOWING EXTERIOR DOOR, ...
2. VAL CONTROL STATION, VIEW OF INTERIOR SHOWING EXTERIOR DOOR, WINDOWS AND CONTROL PANELS, LOOKING SOUTHEAST. - Variable Angle Launcher Complex, Control Station, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA
Unity hatch closed in preparation for launch on STS-88
NASA Technical Reports Server (NTRS)
1998-01-01
Workers in the Space Station Processing Facility hold part of the equipment to close the hatch to the Unity connecting module, part of the International Space Station, before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time.
Unity hatch closed in preparation for launch on STS-88
NASA Technical Reports Server (NTRS)
1998-01-01
Workers in the Space Station Processing Facility close the access hatch to the Unity connecting module, part of the International Space Station, before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time.
2011-07-05
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members took their posts at about 12:30 p.m. EDT, July 5 to prepare for space shuttle Atlantis' STS-135 mission to the International Space Station. The countdown clock began ticking backward from the T-43 hour mark at 1 p.m. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-05
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members took their posts at about 12:30 p.m. EDT, July 5 to prepare for space shuttle Atlantis' STS-135 mission to the International Space Station. The countdown clock began ticking backward from the T-43 hour mark at 1 p.m. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-05
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members took their posts at about 12:30 p.m. EDT, July 5 to prepare for space shuttle Atlantis' STS-135 mission to the International Space Station. The countdown clock began ticking backward from the T-43 hour mark at 1 p.m. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
2011-07-05
CAPE CANAVERAL, Fla. -- In Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members took their posts at about 12:30 p.m. EDT, July 5 to prepare for space shuttle Atlantis' STS-135 mission to the International Space Station. The countdown clock began ticking backward from the T-43 hour mark at 1 p.m. Atlantis and its crew of four are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin
NASA Technical Reports Server (NTRS)
Soeder, James F.; Frye, Robert J.; Phillips, Rudy L.
1991-01-01
Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) and the Rocketdyne Division of Rockwell International have had extensive efforts underway to develop test beds to support the definition of the detailed electrical power system design. Because of the extensive redirections that have taken place in the Space Station Freedom Program in the past several years, the test bed effort was forced to accommodate a large number of changes. A short history of these program changes and their impact on the LeRC test beds is presented to understand how the current test bed configuration has evolved. The current test objectives and the development approach for the current DC Test Bed are discussed. A description of the test bed configuration, along with its power and controller hardware and its software components, is presented. Next, the uses of the test bed during the mature design and verification phase of SSFP are examined. Finally, the uses of the test bed in operation and evolution of the SSF are addressed.
NASA Technical Reports Server (NTRS)
Soeder, James F.; Frye, Robert J.; Phillips, Rudy L.
1991-01-01
Since the beginning of the Space Station Freedom Program (SSFP), the NASA Lewis Research Center (LeRC) and the Rocketdyne Division of Rockwell International have had extensive efforts underway to develop testbeds to support the definition of the detailed electrical power system design. Because of the extensive redirections that have taken place in the Space Station Freedom Program in the past several years, the test bed effort was forced to accommodate a large number of changes. A short history of these program changes and their impact on the LeRC test beds is presented to understand how the current test bed configuration has evolved. The current test objectives and the development approach for the current DC test bed are discussed. A description of the test bed configuration, along with its power and controller hardware and its software components, is presented. Next, the uses of the test bed during the mature design and verification phase of SSFP are examined. Finally, the uses of the test bed in the operation and evolution of the SSF are addressed.
View southeast of main supervisory board showing panels 3 through ...
View southeast of main supervisory board showing panels 3 through 11; panel 3 at far left contains meters for monitoring power in the system; panel 4 contains controls for controlling heaters to keep track twitches free of ice and snow; panels 5, 6, and 7 date to the 1935 installation and control the catenary in the area of the station yard. These work on 120 volts direct current; panel 8 contains circuit breakers (rupture switches) which control power to individual tracks in the station area; panels 9 and 10 house controls for the West Philadelphia sub-station; panel 11 controls sub-station 13 in South Wilmington Delaware and miscellaneous meters - Thirtieth Street Station, Power Director Center, Thirtieth & Market Streets in Amtrak Railroad Station, Philadelphia, Philadelphia County, PA
Synthetic Minor NSR Permit: Northern Border Pipeline Company - Compressor Station #2
This page contains the response to public comments and the final synthetic minor NSR permit for the Northern Border Pipeline Company Compressor Station #2, located on the Fort Peck Indian Reservation in Roosevelt County, Montana.
Synthetic Minor NSR Permit: Red Cedar Gathering Company - Sambrito Compressor Station
This page contains the response to public comments and the final synthetic minor NSR permit for the Red Cedar Gathering Company, Sambrito Compressor Station, located on the Southern Ute Indian Reservation in La Plata County, CO.
Aerobrake assembly with minimum Space Station accommodation
NASA Technical Reports Server (NTRS)
Katzberg, Steven J.; Butler, David H.; Doggett, William R.; Russell, James W.; Hurban, Theresa
1991-01-01
The minimum Space Station Freedom accommodations required for initial assembly, repair, and refurbishment of the Lunar aerobrake were investigated. Baseline Space Station Freedom support services were assumed, as well as reasonable earth-to-orbit possibilities. A set of three aerobrake configurations representative of the major themes in aerobraking were developed. Structural assembly concepts, along with on-orbit assembly and refurbishment scenarios were created. The scenarios were exercised to identify required Space Station Freedom accommodations. Finally, important areas for follow-on study were also identified.
2009-10-01
FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT CONSTRUCTION OF NEW RECREATIONAL LODGING AT BELLOWS AIR FORCE STATION , O’AHU, HAWAri... Environmental Assessment for the Proposed Construction of New Recreational Lodging at Bellows Air Force Station , O’ahu, Hawaii 1. The 15th Airlift Wing (15...A W) is prepanng an Environmental Assessment to address the proposed Construction of New Recreational Lodging at Bellows Air Force Station (AFS
A Novel Methodology for Charging Station Deployment
NASA Astrophysics Data System (ADS)
Sun, Zhonghao; Zhao, Yunwei; He, Yueying; Li, Mingzhe
2018-02-01
Lack of charging stations has been a main obstacle to the promotion of electric vehicles. This paper studies deploying charging stations in traffic networks considering grid constraints to balance the charging demand and grid stability. First, we propose a statistical model for charging demand. Then we combine the charging demand model with power grid constraints and give the formulation of the charging station deployment problem. Finally, we propose a theoretical solution for the problem by transforming it to a Markov Decision Process.
Implementation method of multi-terminal DC control system
NASA Astrophysics Data System (ADS)
Yi, Liu; Hao-Ran, Huang; Jun-Wen, Zhou; Hong-Guang, Guo; Yu-Yong, Zhou
2018-04-01
Currently the multi-terminal DC system (MTDC) has more stations. Each station needs operators to monitor and control the device. It needs much more operation and maintenance, low efficiency and small reliability; for the most important reason, multi-terminal DC system has complex control mode. If one of the stations has some problem, the control of the whole system should have problems. According to research of the characteristics of multi-terminal DC (VSC-MTDC) systems, this paper presents a strong implementation of the multi-terminal DC Supervisory Control and Data Acquisition (SCADA) system. This system is intelligent, can be networking, integration and intelligent. A master control system is added in each station to communication with the other stations to send current and DC voltage value to pole control system for each station. Based on the practical application and information feedback in the China South Power Grid research center VSC-MTDC project, this system is higher efficiency and save the cost on the maintenance of convertor station to improve the intelligent level and comprehensive effect. And because of the master control system, a multi-terminal system hierarchy coordination control strategy is formed, this make the control and protection system more efficiency and reliability.
Operating manual for the miniservo-control tester
Rapp, W.L.
1986-01-01
Ever since the implementation of servo-control units (regular and minimodels) with manometers at U. S. Geological Survey streamflow stations, the need for an effective and efficient servo-control unit tester has been paramount among field personnel. In numerous cases, servo-control unit failures were blamed on battery failures and vice versa. There was no valid instrument to definitively identify cause of failure, let alone properly diagnose the servo-control/manometer system. In 1983, two servo-control unit testers were developed and fabricated. One was mechanical in fabrication, operation, and serviceability; the other was electronic. The testers were extensively used and evaluated in Maine, Ohio, Kansas, and Louisiana under a wide range of environmental conditions. The consensus to integrate the best aspects of both testers into one instrument allowed the Survey to finally solve its long-time need for an effective, efficient servo-control unit tester. (USGS)
NASA Technical Reports Server (NTRS)
Gettman, Chang-Ching L.; Adams, Neil; Bedrossian, Nazareth; Valavani, Lena
1993-01-01
This paper demonstrates an approach to nonlinear control system design that uses linearization by state feedback to allow faster maneuvering of payloads by the Shuttle Remote Manipulator System (SRMS). A nonlinear feedback law is defined to cancel the nonlinear plant dynamics so that a linear controller can be designed for the SRMS. First a nonlinear design model was generated via SIMULINK. This design model included nonlinear arm dynamics derived from the Lagrangian approach, linearized servo model, and linearized gearbox model. The current SRMS position hold controller was implemented on this system. Next, a trajectory was defined using a rigid body kinematics SRMS tool, KRMS. The maneuver was simulated. Finally, higher bandwidth controllers were developed. Results of the new controllers were compared with the existing SRMS automatic control modes for the Space Station Freedom Mission Build 4 Payload extended on the SRMS.
47 CFR 80.94 - Control by coast or Government station.
Code of Federal Regulations, 2011 CFR
2011-10-01
... frequency, the suspension of communication and the permissible type of message traffic that may be... 47 Telecommunication 5 2011-10-01 2011-10-01 false Control by coast or Government station. 80.94...-General § 80.94 Control by coast or Government station. When communicating with a coast station or any...
47 CFR 80.94 - Control by coast or Government station.
Code of Federal Regulations, 2010 CFR
2010-10-01
... frequency, the suspension of communication and the permissible type of message traffic that may be... 47 Telecommunication 5 2010-10-01 2010-10-01 false Control by coast or Government station. 80.94...-General § 80.94 Control by coast or Government station. When communicating with a coast station or any...
Space Shuttle GN and C Development History and Evolution
NASA Technical Reports Server (NTRS)
Zimpfer, Douglas; Hattis, Phil; Ruppert, John; Gavert, Don
2011-01-01
Completion of the final Space Shuttle flight marks the end of a significant era in Human Spaceflight. Developed in the 1970 s, first launched in 1981, the Space Shuttle embodies many significant engineering achievements. One of these is the development and operation of the first extensive fly-by-wire human space transportation Guidance, Navigation and Control (GN&C) System. Development of the Space Shuttle GN&C represented first time inclusions of modern techniques for electronics, software, algorithms, systems and management in a complex system. Numerous technical design trades and lessons learned continue to drive current vehicle development. For example, the Space Shuttle GN&C system incorporated redundant systems, complex algorithms and flight software rigorously verified through integrated vehicle simulations and avionics integration testing techniques. Over the past thirty years, the Shuttle GN&C continued to go through a series of upgrades to improve safety, performance and to enable the complex flight operations required for assembly of the international space station. Upgrades to the GN&C ranged from the addition of nose wheel steering to modifications that extend capabilities to control of the large flexible configurations while being docked to the Space Station. This paper provides a history of the development and evolution of the Space Shuttle GN&C system. Emphasis is placed on key architecture decisions, design trades and the lessons learned for future complex space transportation system developments. Finally, some of the interesting flight operations experience is provided to inform future developers of flight experiences.
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata has a final fitting of his launch and entry suit. Wakata will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
This page contains the final PSD permit for the Cheyenne Light, Fuel & Power / Black Hills Power, Inc. Cheyenne Prairie Generating Station, located in Laramie, Wyoming, and operated by Black Hills Service Company.
The Flight Service Station Training Program : 1981-1985.
DOT National Transportation Integrated Search
1986-06-01
This report describes the performance of the ATC classes in the Flight Service Station Training Program 1981 to 1985 on the skills tests and laboratory exercises in Preflight (pilot briefing), Inflight, and Emergency Services. Over 80% of the final g...
Tribology approach to the engineering and study of articular cartilage.
Wimmer, Markus A; Grad, Sibylle; Kaup, Thomas; Hänni, Markus; Schneider, Erich; Gogolewski, Sylwester; Alini, Mauro
2004-01-01
This study has been based on the assumption that articular motion is an important aspect of mechanotransduction in synovial joints. For this reason a new bioreactor concept, able to reproduce joint kinematics more closely, has been designed. The prototype consists of a rotating scaffold and/or cartilage pin, which is pressed onto an orthogonally rotating ball. By oscillating pin and ball in phase difference, elliptical displacement trajectories are generated that are similar to the motion paths occurring in vivo. Simultaneously, dynamic compression may be applied with a linear actuator, while two-step-motors generate the rotation of pin and ball. The whole apparatus is placed in an incubator. The control station is located outside. Preliminary investigations at the gene expression level demonstrated promising results. Compared with free-swelling control and/or simply compression-loaded samples, chondrocyte-seeded scaffolds as well as nasal cartilage explants exposed to interface motion both showed elevated levels of cartilage oligomeric matrix protein mRNA. The final design of the bioreactor will include four individual stations in line, which will facilitate the investigation of motion-initiated effects at the contacting surfaces in more detail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...
Code of Federal Regulations, 2010 CFR
2010-10-01
... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...
Code of Federal Regulations, 2012 CFR
2012-10-01
... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...
MERCATOR: Methods and Realization for Control of the Attitude and the Orbit of spacecraft
NASA Technical Reports Server (NTRS)
Tavernier, Gilles; Campan, Genevieve
1993-01-01
Since 1974, CNES has been involved in geostationary positioning. Among different entities participating in operations and their preparation, the Flight Dynamics Center (FDC) is in charge of performing the following tasks: orbit determination; attitude determination; computation, monitoring, and calibration of orbit maneuvers; computation, monitoring, and calibration of attitude maneuvers; and operational predictions. In order to fulfill this mission, the FDC receives telemetry from the satellite and localization measurements from ground stations (e.g., CNES, NASA, INTELSAT). These data are processed by space dynamics programs integrated in the MERCATOR system which is run on SUN workstations (UNIX O.S.). The main features of MERCATOR are redundancy, modularity, and flexibility: efficient, flexible, and user friendly man-machine interface; and four identical SUN stations redundantly linked in an Ethernet network. Each workstation can perform all the tasks from data acquisition to computation results dissemination through a video network. A team of four engineers can handle the space mechanics aspects of a complete geostationary positioning from the injection into a transfer orbit to the final maneuvers in the station-keeping window. MERCATOR has been or is to be used for operations related to more than ten geostationary positionings. Initially developed for geostationary satellites, MERCATOR's methodology was also used for satellite control centers and can be applied to a wide range of satellites and to future manned missions.
Long range geoid control through the European GPS traverse: Final results
NASA Technical Reports Server (NTRS)
Torge, W.; Basic, T.; Denker, H.; Doliff, J.; Wenzel, H.-G.
1989-01-01
The European north-south Global Positioning System (GPS)-traverse proposed by IAG SSG 3.88, should control and improve the European geoid. This traverse follows first order leveling lines, included in the United European Leveling Network. From May to August 1986 and in July 1987, the central and northern part of this traverse (approx. 3000 km) was observed using up to four TI 4100 receivers, covering Austria, Federal Republic of Germany, Denmark, Sweden and Norway. Both traverse parts contain 71 stations with distances of about 50 km. In addition, 8 stations have been occupied for overlapping connections, and traverse links were established for connecting the fundamental stations Wettzell (VLBI and SLR) and Onsala (VLBI). Final results show a GPS observation precision of a few cm for loops of some 100 km circumference. After transformation of the GPS results to geoid heights using the leveled heights, comparisons with different existing gravimetric geoid determinations including geopotential models were performed. In addition, new geopotential models complete to degree and order 360 tailored to gravity data in Europe, and gravimetric geoid solutions using 6 x 10' mean gravity anomalies were investigated. The comparison with GPS and leveling yields rms discrepancies of + or - 0.1...0.2 m over 1000 km traverse sections for the best solutions, but a strong slope is existing in Sweden and southern Norway in almost all solutions, which is probably caused by systematic errors in the available gravity data for Scandinavia. This is confirmed by a new geoid computation at the Danish Geodetic Institute where the slope has disappeared. If this new solution is taken for the northern traverse section and the best solution for the central part, the rms discrepancy reduces to approximately + or - 0.2 m over 3000 km. Thus, a + or - 10 (exp 7) relative height accuracy seems to be achievable over long distances with the GPS/leveling and the gravimetric geoid calculation techniques, applied in this experiment.
Closed-loop motor control using high-speed fiber optics
NASA Technical Reports Server (NTRS)
Dawson, Reginald (Inventor); Rodriquiz, Dagobert (Inventor)
1991-01-01
A closed-loop control system for controlling the operation of one or more servo motors or other controllable devices is described. The system employs a fiber optics link immune to electromagnetic interference, for transmission of control signals from a controller or controllers at a remote station to the power electronics located in proximity to the motors or other devices at the local station. At the remote station the electrical control signals are time-multiplexed, converted to a formatted serial bit stream, and converted to light signals for transmission over a single fiber of the fiber optics link. At the local station, the received optical signals are reconstructed as electrical control signals for the controlled motors or other devices. At the local station, an encoder sensor linked to the driven device generates encoded feedback signals which provide information as to a condition of the controlled device. The encoded signals are placed in a formatted serial bit stream, multiplexed, and transmitted as optical signals over a second fiber of the fiber optic link which closes the control loop of the closed-loop motor controller. The encoded optical signals received at the remote station are demultiplexed, reconstructed and coupled to the controller(s) as electrical feedback signals.
2002-03-13
Scaled Composites' Doug Shane examines the screen of his ground control station during tests in New Mexico. Shane used this configuration as the ground control station to remotely pilot the Proteus aircraft during a NASA sponsored series of tests.
Eclipse of the Floating Orbs: Controlling Robots on the International Space Station
NASA Technical Reports Server (NTRS)
Wheeler, D. W.
2017-01-01
I will describe the Control Station for a free-flying robot called Astrobee. Astrobee will serve as a mobile camera, sensor platform, and research testbed when it is launched to the International Space Station (ISS)in 2017. Astronauts on the ISS as well as ground-based users will control Astrobee using the Eclipse-based Astrobee Control Station. Designing theControl Station for use in space presented unique challenges, such as allowing the intuitive input of 3D information without a mouse or trackpad. Come to this talk to learn how Eclipse is used in an environment few humans have the chance to visit.
Bonding machine for forming a solar array strip
NASA Technical Reports Server (NTRS)
Costogue, E. N.; Downing, R. G.; Middleton, O.; Mueller, R. L.; Yasui, R. K.; Cairo, F. J.; Person, J. K. (Inventor)
1979-01-01
A machine is described for attaching solar cells to a flexable substrate on which printed circuitry has been deposited. The strip is fed through: (1) a station in which solar cells are elevated into engagement with solder pads for the printed circuitry and thereafter heated by an infrared lamp; (2) a station at which flux and solder residue is removed; (3) a station at which electrical performance of the soldered cells is determined; (4) a station at which an encapsulating resin is deposited on the cells; (5) a station at which the encapsulated solar cells are examined for electrical performance; and (6) a final station at which the resulting array is wound on a takeup drum.
35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...
35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA
This page contains a November 1994 fact sheet for the final NESHAP for Gasoline Distribution Facilities. This page also contains a December fact sheet with information regarding the final amendments to the 2003 final rule for the NESHAP.
International Space Station (ISS)
1994-07-20
An artist's conception of what the final configuration of the International Space Station (ISS) will look like when it is fully built and deployed. The ISS is a multidisciplinary laboratory, technology test bed, and observatory that will provide an unprecedented undertaking in scientific, technological, and international experimentation.
Modular space station phase B extension preliminary system design. Volume 5: configuration analyses
NASA Technical Reports Server (NTRS)
Stefan, A. J.; Goble, G. J.
1972-01-01
The initial and growth modular space station configurations are described, and the evolutionary steps arriving at the final configuration are outlined. Supporting tradeoff studies and analyses such as stress, radiation dosage, and micrometeoroid and thermal protection are included.
49 CFR 192.469 - External corrosion control: Test stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false External corrosion control: Test stations. 192.469... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Requirements for Corrosion Control § 192.469 External corrosion control: Test stations. Each pipeline under cathodic protection...
49 CFR 192.469 - External corrosion control: Test stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false External corrosion control: Test stations. 192.469... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Requirements for Corrosion Control § 192.469 External corrosion control: Test stations. Each pipeline under cathodic protection...
49 CFR 192.469 - External corrosion control: Test stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false External corrosion control: Test stations. 192.469... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Requirements for Corrosion Control § 192.469 External corrosion control: Test stations. Each pipeline under cathodic protection...
49 CFR 192.469 - External corrosion control: Test stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false External corrosion control: Test stations. 192.469... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Requirements for Corrosion Control § 192.469 External corrosion control: Test stations. Each pipeline under cathodic protection...
49 CFR 192.469 - External corrosion control: Test stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false External corrosion control: Test stations. 192.469... TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Requirements for Corrosion Control § 192.469 External corrosion control: Test stations. Each pipeline under cathodic protection...
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire and kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from its seaside launch pad at NASA's Kennedy Space Center in Florida. Endeavour began its final flight, the STS-134 mission, to the International Space Station on time at 8:56 a.m. EDT on May 16. Endeavour and its six-member crew are embarking on a mission to deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jim Grossmann
2011-05-16
CAPE CANAVERAL, Fla. -- The American flag sways in the breeze as space shuttle Endeavour soars into the sky on the STS-134 mission to the International Space Station. The shuttle and its six-member crew lifted off from Launch Pad 39A at NASA's Kennedy Space Center in Florida on time at 8:56 a.m. EDT on May 16. STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Troy Cryder
2011-05-16
CAPE CANAVERAL, Fla. -- Rising on twin columns of fire and kicking up a trail of smoke and steam, space shuttle Endeavour lifts off from its seaside launch pad at NASA's Kennedy Space Center in Florida. Endeavour began its final flight, the STS-134 mission, to the International Space Station on time at 8:56 a.m. EDT on May 16. Endeavour and its six-member crew are embarking on a mission to deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the space station. Endeavour's first launch attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jim Grossmann
Catastrophic Storm Seen from Space on This Week @NASA – September 1, 2017
2017-09-01
We worked with our partner agencies to use space-based assets to capture imagery of Hurricane Harvey that impacted the Texas-Louisiana Gulf Coast region. Imagery captured from the vantage point of space, provides data that weather forecasters, emergency responders and other officials can use to better inform the public. Views from the International Space Station, and NOAA’s GOES East satellite showed the massive size and movement of the storm. While our Global Precipitation Measurement (GPM) Mission analyzed the storm’s record-breaking rainfall – which led to catastrophic flooding in Texas and Louisiana. Due to the storm, our Johnson Space Center in Houston is closed through Labor Day, while the region recovers, but Mission Control remains operational in support of the crew aboard the International Space Station. Also, Final RS-25 Engine Test of the Summer, Key SLS Rocket Hardware Finished, and Researching Quiet Supersonic Flight!
2009-03-15
CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, NASA management waits for the launch of space shuttle Discovery on the STS-119 mission. From left are (standing) Director of NASA's Marshall Space Flight Center Dave King, Center Director Bob Cabana, Director of NASA's Johnson Space Center Michael Coats, (seated) Space Shuttle Program Manager John Shannon, NASA Associate Administrator for Space Operations William Gerstenmaier and NASA Acting Administrator Chris Scolese. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
New York harbor water-quality survey, 1988-1990. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brosnan, T.M.
1991-08-27
Fifty two stations were monitored over twelve weeks of each of the summers of 1988 through 1990 to provide the 79th, 80th, and 81st Annual Summer Water Quality Surveys of New York Harbor. Coliform bacteria continue to exhibit significant long-term improvements throughout the harbor due to water pollution control plant construction and upgrades. Only 4% of stations were out of compliance with coliform standards in 1990, with exceedances confined to waterways heavily impacted by combined sewer overflows (CSO's). In 1990, average summer dissolved oxygen (DO) met state standards at 94% of surface, and 85% of bottom sites; however many sitesmore » contravened DO standards at least once. While average DO compliance in 1990 was significantly better than any time since at least 1986, 1988 and 1989 were noticeably worse, particularly in waterways prone to phytoplankton blooms and density stratification. Nutrient and chlorophyll a concentrations displayed spatial trends.« less
NASA Technical Reports Server (NTRS)
Singh, Sudeep K.; Lindenmoyer, Alan J.
1989-01-01
Results are presented from a preliminary control/structure interaction study of the Space Station, the Assembly Work Platform, and the STS orbiter dynamics coupled with the orbiter and station control systems. The first three Space Station assembly flight configurations and their finite element representations are illustrated. These configurations are compared in terms of control authority in each axis and propellant usage. The control systems design parameters during assembly are computed. Although the rigid body response was acceptable with the orbiter Primary Reaction Control System, the flexible body response showed large structural deflections and loads. It was found that severe control/structure interaction occurred if the stiffness of the Assembly Work Platform was equal to that of the station truss. Also, the response of the orbiter Vernier Reaction Control System to small changes in inertia properties is examined.
Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
46 CFR 154.320 - Cargo control stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) If a cargo control station is in accommodation, service, or control spaces or has access to such a space, the station must: (1) Be a gas safe space; (2) Have an access to the space that meets § 154.330...
46 CFR 154.320 - Cargo control stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) If a cargo control station is in accommodation, service, or control spaces or has access to such a space, the station must: (1) Be a gas safe space; (2) Have an access to the space that meets § 154.330...
47 CFR 73.3540 - Application for voluntary assignment or transfer of control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... control of a corporate licensee or permittee for an FM or TV translator station, a low power TV station and any associated auxiliary station, such as translator microwave relay stations and UHF translator... Licensee or Permittee, or Assignment of License or Permit for an FM or TV translator Station, or a Low...
Crew interface with a telerobotic control station
NASA Technical Reports Server (NTRS)
Mok, Eva
1987-01-01
A method for apportioning crew-telerobot tasks has been derived to facilitate the design of a crew-friendly telerobot control station. To identify the most appropriate state-of-the-art hardware for the control station, task apportionment must first be conducted to identify if an astronaut or a telerobot is best to execute the task and which displays and controls are required for monitoring and performance. Basic steps that comprise the task analysis process are: (1) identify space station tasks; (2) define tasks; (3) define task performance criteria and perform task apportionment; (4) verify task apportionment; (5) generate control station requirements; (6) develop design concepts to meet requirements; and (7) test and verify design concepts.
Morin, Robert L.; Glen, Jonathan M.G.
2003-01-01
Gravity data were collected between 1999 and 2002 along transects in the Talkeetna Mountains of south-central Alaska as part of a geological and geophysical study of the framework geology of the region. The study area lies between 61° 30’ and 63° 45’ N. latitude and 145° and 151° W. longitude. This data set includes 408 gravity stations. These data, combined with the pre-existing 3,286 stations, brings the total data in this area to 3,694 gravity stations. Principal facts for the 408 new gravity stations and the 15 gravity base stations used for control are listed in this report. During the summer of 1999, a gravity survey was conducted in the western Talkeetna Mountains. Measurements at 55 gravity stations were made. One gravity base station was used for control for this survey. This base station, STEP, is located at the Stephan Lake Lodge on Stephan Lake. The observed gravity of this station was calculated based on an indirect tie to base station ANCL in Anchorage. The temporary base used to tie between STEP and ANCL was REGL in Anchorage. During the summer of 2000, a gravity survey was conducted in the western Talkeetna Mountains. Measurements at 56 gravity stations were made. One gravity base station was used for control for this survey. This base station, GRHS, is located at the Gracious House Lodge on the Denali Highway. The observed gravity of this station was calculated based on multiple ties to base stations D87, and D57 along the Denali Highway. During the summer of 2001, a gravity survey was conducted in the western Talkeetna Mountains. Measurements at 90 gravity stations were made. One gravity base station was used for control for this survey. This base station, HLML, is located at the High Lake Lodge. The observed gravity of this station was calculated based on multiple ties to base stations ANCU in Anchorage, PALH in Palmer, WASA in Wasilla, and TLKM in Talkeetna. Also during the summer of 2001, a gravity survey was conducted in the vicinity of Tangle Lakes. Measurements at 86 gravity stations were made. The Tangle Lakes area is located about 25 km west of Paxson and north of the Denali Highway. One gravity base station was used for control for this survey. This base station, TLIN, is located at the Tangle Lakes Inn. The observed gravity of this station was calculated based on multiple ties to base stations ANCU in Anchorage, PALH in Palmer, BD27 in Gulkana, B-07 on the Richardson Highway, and base stations D42, and D57 along the Denali Highway. During the summer of 2002, measurements at an additional 107 gravity stations were made in the vicinity of Tangle Lakes. Base station TLIN at the Tangle Lakes Inn was again used for control. Additional ties to base stations ANCU and B-07 were made.
NASA/ASEE Summer Faculty Fellowship Program, 1990, Volume 1
NASA Technical Reports Server (NTRS)
Bannerot, Richard B. (Editor); Goldstein, Stanley H. (Editor)
1990-01-01
The 1990 Johnson Space Center (JSC) NASA/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston-University Park and JSC. A compilation of the final reports on the research projects are presented. The topics covered include: the Space Station; the Space Shuttle; exobiology; cell biology; culture techniques; control systems design; laser induced fluorescence; spacecraft reliability analysis; reduced gravity; biotechnology; microgravity applications; regenerative life support systems; imaging techniques; cardiovascular system; physiological effects; extravehicular mobility units; mathematical models; bioreactors; computerized simulation; microgravity simulation; and dynamic structural analysis.
NASA Technical Reports Server (NTRS)
1973-01-01
Configuration data and design information for the Atlas Centaur launched configuration are presented. Overall system definition, operations and control, and telecommunication service system, including link budgets, are discussed. A brief description of the user telecommunications equipment and ground station is presented. A summary description of the TDR spacecraft and all the subsystems is included. The data presented are largely in tabular form. A brief treatment of an optional configuration with enhanced telecommunications service is described.
2012-11-01
miles east of Texarkana , Arkansas in Lafayette County (see Figure 1). The Installation is comprised of approximately 79 acres of government-owned land...34’ f ~ • c COifl’lty Cl 8 l ARKANSAS _ Texarkana T* "’ " , . TOt t.•f•)’•tl• tO Ad " . N ~ " ..,:;;. .. . ~ . ; f J " . 0...tainment for the criteria pollutant. Lafayette County is located in the Shreveport- Texarkana -Tyler Interstate Air Quality Control Region. Red
2011-06-29
Action and Alternatives 9 2.5 Identification of the Preferred Action 10 3.0 AFFECTED ENVIRONMENT 13 3.1 New Boston Air Force Station 13 3.1.1 Air...the alternative actions is presented in Section 2.4. Finally, identification of the Preferred Action is presented in Section 2.5. 2.1 PROPOSED...presented in Chapter 4.0 of this EA. 2.5 IDENTIFICATION OF THE PREFERRED ACTION The USAF’s Preferred Action is to implement the Proposed Action at
Analysis on influencing factors of EV charging station planning based on AHP
NASA Astrophysics Data System (ADS)
Yan, F.; Ma, X. F.
2016-08-01
As a new means of transport, electric vehicle (EV) is of great significance to alleviate the energy crisis. EV charging station planning has a far-reaching significance for the development of EV industry. This paper analyzes the impact factors of EV charging station planning, and then uses the analytic hierarchy process (AHP) to carry on the further analysis to the influencing factors, finally it gets the weight of each influence factor, and provides the basis for the evaluation scheme of the planning of charging stations for EV.
Synthetic Minor NSR Permit: XTO Energy, Inc. - Wild Horse Bench Compressor Station
This page contains the response to public comments, the final synthetic minor NSR permit, and the administrative record for the XTO Energy, Inc. Wild Horse Bench Compressor Station, located on the Uintah and Ouray Indian Reservation in Uintah County, UT.
Space-to-Ground: Teacher On Board: 10/20/2017
2017-10-20
The crew completed their third and final spacewalk for the month...We kicked off a year of education on station...and we talk about the importance of astronaut photography. Space to Ground is your weekly update on what's happening aboard the International Space Station.
Medical Image Processing Server applied to Quality Control of Nuclear Medicine.
NASA Astrophysics Data System (ADS)
Vergara, C.; Graffigna, J. P.; Marino, E.; Omati, S.; Holleywell, P.
2016-04-01
This paper is framed within the area of medical image processing and aims to present the process of installation, configuration and implementation of a processing server of medical images (MIPS) in the Fundación Escuela de Medicina Nuclear located in Mendoza, Argentina (FUESMEN). It has been developed in the Gabinete de Tecnologia Médica (GA.TE.ME), Facultad de Ingeniería-Universidad Nacional de San Juan. MIPS is a software that using the DICOM standard, can receive medical imaging studies of different modalities or viewing stations, then it executes algorithms and finally returns the results to other devices. To achieve the objectives previously mentioned, preliminary tests were conducted in the laboratory. More over, tools were remotely installed in clinical enviroment. The appropiate protocols for setting up and using them in different services were established once defined those suitable algorithms. Finally, it’s important to focus on the implementation and training that is provided in FUESMEN, using nuclear medicine quality control processes. Results on implementation are exposed in this work.
Updates on HRF Payloads Operations in Columbus ATCS
NASA Technical Reports Server (NTRS)
DePalo, Savino; Wright, Bruce D.; La,e Robert E.; Challis, Simon; Davenport, Robert; Pietrafesa, Donata
2011-01-01
The NASA developed Human Research Facility 1 (HRF1) and Human Research Facility (HRF2) experiment racks have been operating in the European Space Agency (ESA) Columbus module of the International Space Station (ISS) since Summer 2008. The two racks are of the same design. Since the start of operations, unexpected pressure spikes were observed in the Columbus module's thermal-hydraulic system during the racks activation sequence. The root cause of these spikes was identified in the activation command sequence in the Rack Interface Controller (RIC), which controls the flow of thermal-hydraulic system fluid through the rack. A new Common RIC Software (CRS) release fixed the bug and was uploaded on both racks in late 2009. This paper gives a short introduction to the topic, describes the Columbus module countermeasures to mitigate the spikes, describes the ground validation test of the new software, and describes the flight checks performed before and after the final upload. Finally, the new on-orbit test designed to further simplify the racks hydraulic management is presented.
STS-101: Crew Activity Report CAR/Flight Day 04 Highlights
NASA Technical Reports Server (NTRS)
2000-01-01
On this fourth day of the STS-101 Atlantis mission, the flight crew, Commander James D. Halsell Jr., Pilot Scott J. Horowitz, and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev are seen performing final preparations for the scheduled space walk. Horowitz, Williams and Voss are seen in the mid-deck before the space walk. Horowitz and Weber are also seen in the flight deck, powering-up the robot-arm. During the space walk Voss is seen checking the American Cargo Crane-Orbital Replacement Unit Transfer Device. Voss and Williams are shown securing the American-built crane that was installed on the station last year. They are seen as they install the final parts (boom extension) of a Russian-built crane on the station. Voss and Williams are also shown as they replace a faulty antenna for one of the station's communications systems on the Unity Module, and install several handrails and a camera cable on the station's exterior.
Coordinated study of Solar-Terrestrial Observatory (STO) payloads on space station
NASA Technical Reports Server (NTRS)
Wu, S. T.
1988-01-01
Since the publication of the final report of the science study group in October 1984 on the Solar Terrestrial Observatory (STO), its science goals and objectives have been clearly defined and a conceptual design and analysis was carried out by MSFC/NASA. Plans for the possible placing of the STO aboard the Space Station were made. A series of meetings for the STO science study group were held to review the instruments to be placed on the initial STO at Space Station IOC, and the placement of these instruments on the manned space station, polar platform, and the co-orbiting platform. A summary of these initial STO instruments is presented in Section 2. A brief description of the initial plan for the placement of STO instruments is included in Section 3. Finally, in Section 4, the scenario for the operation of the STO is discussed. These results were obtained from the report of the Solar Terrestrial Observatory mini-workshop held at MSFC on 6 June 1985.
Petkewich, Matthew D.; Daamen, Ruby C.; Roehl, Edwin A.; Conrads, Paul
2016-09-29
The Everglades Depth Estimation Network (EDEN), with over 240 real-time gaging stations, provides hydrologic data for freshwater and tidal areas of the Everglades. These data are used to generate daily water-level and water-depth maps of the Everglades that are used to assess biotic responses to hydrologic change resulting from the U.S. Army Corps of Engineers Comprehensive Everglades Restoration Plan. The generation of EDEN daily water-level and water-depth maps is dependent on high quality real-time data from water-level stations. Real-time data are automatically checked for outliers by assigning minimum and maximum thresholds for each station. Small errors in the real-time data, such as gradual drift of malfunctioning pressure transducers, are more difficult to immediately identify with visual inspection of time-series plots and may only be identified during on-site inspections of the stations. Correcting these small errors in the data often is time consuming and water-level data may not be finalized for several months. To provide daily water-level and water-depth maps on a near real-time basis, EDEN needed an automated process to identify errors in water-level data and to provide estimates for missing or erroneous water-level data.The Automated Data Assurance and Management (ADAM) software uses inferential sensor technology often used in industrial applications. Rather than installing a redundant sensor to measure a process, such as an additional water-level station, inferential sensors, or virtual sensors, were developed for each station that make accurate estimates of the process measured by the hard sensor (water-level gaging station). The inferential sensors in the ADAM software are empirical models that use inputs from one or more proximal stations. The advantage of ADAM is that it provides a redundant signal to the sensor in the field without the environmental threats associated with field conditions at stations (flood or hurricane, for example). In the event that a station does malfunction, ADAM provides an accurate estimate for the period of missing data. The ADAM software also is used in the quality assurance and quality control of the data. The virtual signals are compared to the real-time data, and if the difference between the two signals exceeds a certain tolerance, corrective action to the data and (or) the gaging station can be taken. The ADAM software is automated so that, each morning, the real-time EDEN data are compared to the inferential sensor signals and digital reports highlighting potential erroneous real-time data are generated for appropriate support personnel. The development and application of inferential sensors is easily transferable to other real-time hydrologic monitoring networks.
International Space Station Alpha trace contaminant control subassembly life test report
NASA Technical Reports Server (NTRS)
Tatara, J. D.; Perry, J. L.
1995-01-01
The Environmental Control and Life Support System (ECLSS) Life Test Program (ELTP) began with Trace Contaminant Control Subassembly (TCCS) Life Testing on November 9, 1992, at 0745. The purpose of the test, as stated in the NASA document 'Requirements for Trace Contaminant Control Subassembly High Temperature Catalytic Oxidizer Life Testing (Revision A)' was to 'provide for the long duration operation of the ECLSS TCCS HTCO (High Temperature Catalytic Oxidizer) at normal operating conditions... (and thus)... to determine the useful life of ECLSS hardware for use on long duration manned space missions.' Specifically, the test was designed to demonstrate thermal stability of the HTCO catalyst. The report details TCCS stability throughout the test. Graphs are included to aid in evaluating trends and subsystem anomalies. The report summarizes activities through the final day of testing, January 17, 1995 (test day 762).
Modular telerobot control system for accident response
NASA Astrophysics Data System (ADS)
Anderson, Richard J. M.; Shirey, David L.
1999-08-01
The Accident Response Mobile Manipulator System (ARMMS) is a teleoperated emergency response vehicle that deploys two hydraulic manipulators, five cameras, and an array of sensors to the scene of an incident. It is operated from a remote base station that can be situated up to four kilometers away from the site. Recently, a modular telerobot control architecture called SMART was applied to ARMMS to improve the precision, safety, and operability of the manipulators on board. Using SMART, a prototype manipulator control system was developed in a couple of days, and an integrated working system was demonstrated within a couple of months. New capabilities such as camera-frame teleoperation, autonomous tool changeout and dual manipulator control have been incorporated. The final system incorporates twenty-two separate modules and implements seven different behavior modes. This paper describes the integration of SMART into the ARMMS system.
2002-12-11
KENNEDY SPACE CENTER, FLA. -- KSC technicians supervise the offloading of the Integrated Equipment Assembly (IEA), one of two major components of the Starboard 6 (S6) truss segment for the International Space Station (ISS), onto a cargo transporter following its arrival at the Shuttle Landing Facility. The IEA will be joined to its companion piece, the Long Spacer, before launch early in 2004. The S6 truss segment will be the 11th and final piece of the Station's Integrated Truss Structure and will support the fourth and final set of solar arrays, batteries, and electronics.
2002-12-11
KENNEDY SPACE CENTER, FLA. -- KSC technicians supervise the transfer of the Integrated Equipment Assembly (IEA), one of two major components of the Starboard 6 (S6) truss segment for the International Space Station (ISS), onto a cargo transporter following its arrival at the Shuttle Landing Facility. The IEA will be joined to its companion piece, the Long Spacer, before launch early in 2004. The S6 truss segment will be the 11th and final piece of the Station's Integrated Truss Structure and will support the fourth and final set of solar arrays, batteries, and electronics.
Collaboration Mechanism for Equipment Instruction of Multiple Energy Systems
NASA Astrophysics Data System (ADS)
Wang, Dong; Wang, Tuo; Wang, Qi; Zhang, Zhao; Zhao, Mingyu; Wang, Yinghui
2018-01-01
When multiple energy systems execute optimization instructions simultaneously, and the same equipment is Shared, the instruction conflict may occur. Aiming at the above problems, taking into account the control objectives of each system, the characteristics of different systems, such as comprehensive clean energy, energy efficiency, and peak filling, etc., designed the instruction coordination mechanism for the daemon. This mechanism mainly acts on the main station of the system, and form a final optimization instruction. For some specific scenarios, the collaboration mechanism of unlocking the terminal is supplemented. The mechanism determines the specific execution instructions based on the arrival time of the instruction. Finally, the experiment in Tianjin eco-city shows that this algorithm can meet the instruction and collaboration requirements of multi-energy systems, and ensure the safe operation of the equipment.
2013-02-15
The Centers for Disease Control and Prevention (CDC), located within the Department of Health and Human Services (HHS), is amending regulations for the importation of live nonhuman primates (NHPs) by extending existing requirements for the importation of Macaca fascicularis (cynomolgus), Chlorocebus aethiops (African green), and Macaca mulatta (rhesus) monkeys to all NHPs with the exception of the filovirus testing requirement. Filovirus testing will only be required for Old World NHPs in quarantine that have illness consistent with filovirus infection or that die for any reason other than trauma during quarantine. HHS/CDC is also finalizing a provision to reduce the frequency at which importers of cynomolgus, African green, and rhesus monkeys are required to renew their special permits (from every 180 days to every 2 years). HHS/CDC is incorporating existing guidelines into the regulations and adding new provisions to address the following: NHPs imported as part of an animal act; NHPs imported or transferred by zoological societies; the transfer of NHPs from approved laboratories; and non-live imported NHP products. Finally, HHS/CDC is also requiring that all NHPs be imported only through ports of entry where a HHS/CDC quarantine station is located.
BROADBAND DIGITAL GEOPHYSICAL TELEMETRY SYSTEM.
Seeley, Robert L.; Daniels, Jeffrey J.
1984-01-01
A system has been developed to simultaneously sample and transmit digital data from five remote geophysical data receiver stations to a control station that processes, displays, and stores the data. A microprocessor in each remote station receives commands from the control station over a single telemetry channel.
Synthetic Minor NSR Permit: XTO Energy, Inc. - RBU 11-18F Compressor Station
This page contains the response to public comments, the final synthetic minor NSR permit, and the administrative record for the XTO Energy, Inc. RBU 11-18F Compressor Station, located on the Uintah and Ouray Indian Reservation in Uintah County, UT.
System and method for transferring telemetry data between a ground station and a control center
NASA Technical Reports Server (NTRS)
Ray, Timothy J. (Inventor); Ly, Vuong T. (Inventor)
2012-01-01
Disclosed herein are systems, computer-implemented methods, and tangible computer-readable media for coordinating communications between a ground station, a control center, and a spacecraft. The method receives a call to a simple, unified application programmer interface implementing communications protocols related to outer space, when instruction relates to receiving a command at the control center for the ground station generate an abstract message by agreeing upon a format for each type of abstract message with the ground station and using a set of message definitions to configure the command in the agreed upon format, encode the abstract message to generate an encoded message, and transfer the encoded message to the ground station, and perform similar actions when the instruction relates to receiving a second command as a second encoded message at the ground station from the control center and when the determined instruction type relates to transmitting information to the control center.
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
Live from Space Station Learning Technologies Project
NASA Technical Reports Server (NTRS)
2001-01-01
This is the Final Report for the Live From Space Station (LFSS) project under the Learning Technologies Project FY 2001 of the MSFC Education Programs Department. AZ Technology, Inc. (AZTek) has developed and implemented science education software tools to support tasks under the LTP program. Initial audience consisted of 26 TreK in the Classroom schools and thousands of museum visitors to the International Space Station: The Earth Tour exhibit sponsored by Discovery Place museum.
Crewmember activity in the middeck and Mir Space Station Base Block
2016-08-24
STS091-361-034 (2-12 June 1998) --- Andrew S.W. Thomas signs a plaque containing the names of all the visitors to Russia's Mir space station. Thomas is the final of seven NASA astronauts to serve as a guest cosmonaut researcher aboard Mir as part of International Space Station (ISS) Phase I. Looking on in the background are astronauts Franklin R. Chang-Diaz, payload commander; and Janet L. Kavandi, mission specialist.
Smart roadside initiative : final report.
DOT National Transportation Integrated Search
2015-09-01
This is the Final Report for the Smart Roadside Initiative (SRI) prototype system deployment project. The SRI prototype was implemented at weigh stations in Grass Lake, Michigan and West Friendship, Maryland. The prototype was developed to integrate ...
Design of an MSAT-X mobile transceiver and related base and gateway stations
NASA Technical Reports Server (NTRS)
Fang, Russell J. F.; Bhaskar, Udaya; Hemmati, Farhad; Mackenthun, Kenneth M.; Shenoy, Ajit
1987-01-01
This paper summarizes the results of a design study of the mobile transceiver, base station, and gateway station for NASA's proposed Mobile Satellite Experiment (MSAT-X). Major ground segment system design issues such as frequency stability control, modulation method, linear predictive coding vocoder algorithm, and error control technique are addressed. The modular and flexible transceiver design is described in detail, including the core, RF/IF, modem, vocoder, forward error correction codec, amplitude-companded single sideband, and input/output modules, as well as the flexible interface. Designs for a three-carrier base station and a 10-carrier gateway station are also discussed, including the interface with the controllers and with the public-switched telephone networks at the gateway station. Functional specifications are given for the transceiver, the base station, and the gateway station.
Design of an MSAT-X mobile transceiver and related base and gateway stations
NASA Astrophysics Data System (ADS)
Fang, Russell J. F.; Bhaskar, Udaya; Hemmati, Farhad; Mackenthun, Kenneth M.; Shenoy, Ajit
This paper summarizes the results of a design study of the mobile transceiver, base station, and gateway station for NASA's proposed Mobile Satellite Experiment (MSAT-X). Major ground segment system design issues such as frequency stability control, modulation method, linear predictive coding vocoder algorithm, and error control technique are addressed. The modular and flexible transceiver design is described in detail, including the core, RF/IF, modem, vocoder, forward error correction codec, amplitude-companded single sideband, and input/output modules, as well as the flexible interface. Designs for a three-carrier base station and a 10-carrier gateway station are also discussed, including the interface with the controllers and with the public-switched telephone networks at the gateway station. Functional specifications are given for the transceiver, the base station, and the gateway station.
CMIP5 based downscaled temperature over Western Himalayan region
NASA Astrophysics Data System (ADS)
Dutta, M.; Das, L.; Meher, J. K.
2016-12-01
Limited numbers of reliable temperature data is available for assessing warming over the Western Himalayan Region (WHR) of India. India meteorological Department provided many stations having more than 30% missing values. Stations having <30% missing values, were replaced using the Multiple Imputation Chained Equation (MICE) technique. Finally 16 stations having continuous records during 1969-2009 were considered as the "reference stations" for assessing the trends in addition to evaluate the Coupled Model Intercomparison, phase 5 (CMIP5) Global Circulation Model(GCMs). Station data indicates higher and rapid (1.41oC) winter warming than the other seasons and least warming was observed in the post monsoon (0.31oC) season. Mean annual warming is 0.84 oC during 1969-2009 indicating the warming over the WHR is more than double the global warming (0.85oC during 1880-2012). The performance of 34 CMIP5 models was evaluated through three different approaches namely comparison of: i) mean seasonal cycle ii) temporal trends and iii) spatial correlation and a rank was assigned to each GCM. How the better performing GCMs able to reproduce the observed spatial details were verified the ERA-interim reanalysis data. Finally station level future downscaled winter temperature has constructed using Empirical Statistical Downscaling (ESD) technique where 2 meter air temperature (T2m) is considered as predictor and station temperature as predictant. Future range of downscaled temperature change for the stations Dheradun, Manali and Gulmarg are 1.3-6.1OC, 1.1-5.8OC and 0.5-5.8OC respectively at the end of 21st century.
Code of Federal Regulations, 2012 CFR
2012-10-01
... term also encompasses requests to assign rights granted by the authorization or to transfer control of.... This power is specified by the Commission in the station's authorization or rules. Control station. A fixed station, the transmissions of which are used to control automatically the emissions or operations...
76 FR 21940 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... improvements, guard-rail, cul-de-sacs, and a potential levee) made necessary based on final design that were... necessary based on final design that were not analyzed in the Tier 2 Section 1 ROD or FEIS (approved... easements, and revised right-of-way to even station and offset) made necessary based on final design that...
Human interactions in space: ISS vs. Shuttle/Mir
NASA Astrophysics Data System (ADS)
Kanas, N. A.; Salnitskiy, V. P.; Ritsher, J. B.; Gushin, V. I.; Weiss, D. S.; Saylor, S. A.; Kozerenko, O. P.; Marmar, C. R.
2006-07-01
This paper compares findings from two NASA-funded studies of international long-duration missions to the Mir space station (Shuttle/Mir) and to the International Space Station (ISS). American and Russian crewmembers and mission control personnel participated. Issues examined included changes in mood and group social climate over time, displacement of group tension to outside monitoring personnel, cultural differences, and leadership roles. Findings were based on the completion of a weekly questionnaire that included items from the Profile of Mood States, the Group Environment Scale, and the Work Environment Scale. An examination of issues investigated in both studies revealed much similarity in findings. There was little support for the presence of changes in levels of mood and group climate over time, and no evidence for a "3rd quarter phenomenon". Both studies also provided evidence for the displacement of negative emotions to outside personnel in both crewmembers and mission control personnel. There were similar patterns of differences between Americans and Russians and between crewmembers and mission control personnel. Finally, in both studies, the support role of the leader was related to group cohesion among crewmembers, and both the task and support roles of the leader were related to cohesion among mission control personnel. Thus, in these four areas, the ISS study substantially replicated the findings from the earlier Shuttle/Mir study, suggesting that common psychosocial issues affect people engaged in on-orbit space missions.
NASA Astrophysics Data System (ADS)
Xie, Chen; Yang, Fan; Liu, Guoqing; Liu, Yang; Wang, Long; Fan, Ziwu
2017-01-01
Water environment of urban rivers suffers degradation with the impacts of urban expansion, especially in Yangtze River Delta. The water area in cites decreased sharply, and some rivers were cut off because of estate development, which brings the problems of urban flooding, flow stagnation and water deterioration. The approach aims to enhance flood control capability and improve the urban river water quality by planning gate-pump stations surrounding the cities and optimizing the locations and functions of the pumps, sluice gates, weirs in the urban river network. These gate-pump stations together with the sluice gates and weirs guarantee the ability to control the water level in the rivers and creating hydraulic gradient artificially according to mathematical model. Therefore the flow velocity increases, which increases the rate of water exchange, the DO concentration and water body self-purification ability. By site survey and prototype measurement, the river problems are evaluated and basic data are collected. The hydrodynamic model of the river network is established and calibrated to simulate the scenarios. The schemes of water quality improvement, including optimizing layout of the water distribution projects, improvement of the flow discharge in the river network and planning the drainage capacity are decided by comprehensive Analysis. Finally the paper introduces the case study of the approach in Changshu City, where the approach is successfully implemented.
ACTS TDMA network control. [Advanced Communication Technology Satellite
NASA Technical Reports Server (NTRS)
Inukai, T.; Campanella, S. J.
1984-01-01
This paper presents basic network control concepts for the Advanced Communications Technology Satellite (ACTS) System. Two experimental systems, called the low-burst-rate and high-burst-rate systems, along with ACTS ground system features, are described. The network control issues addressed include frame structures, acquisition and synchronization procedures, coordinated station burst-time plan and satellite-time plan changes, on-board clock control based on ground drift measurements, rain fade control by means of adaptive forward-error-correction (FEC) coding and transmit power augmentation, and reassignment of channel capacities on demand. The NASA ground system, which includes a primary station, diversity station, and master control station, is also described.
NASA Technical Reports Server (NTRS)
Heinrichs, J. A.; Fee, J. J.
1972-01-01
Space station and solar array data and the analyses which were performed in support of the integrated dynamic analysis study. The analysis methods and the formulated digital simulation were developed. Control systems for space station altitude control and solar array orientation control include generic type control systems. These systems have been digitally coded and included in the simulation.
A10 – UAS Control Station Ergo-nomics Considerations : Tasks CS-6 through CS-8
DOT National Transportation Integrated Search
2017-08-01
The overall objective of the control station tasks within Project A-10 is to provide the Federal Aviation Administration (FAA) with information on an ergonomic design of unmanned aircraft system (UAS) control stations which will allow safe piloting o...
Code of Federal Regulations, 2014 CFR
2014-10-01
... for ground vehicle identification and collision avoidance; (3) No more than two hundred 1090 MHz... utility station at an airport served by a control tower, RCO or FAA flight service station is the frequency used by the control tower for ground traffic control or by the flight service station for...
NASA Technical Reports Server (NTRS)
1983-01-01
User requirements for space station use are presented for the following areas: space environments, astrophysics, Earth observations, and life science. Also included are a summary of study tasks and final reports, a topical cross reference, key team members, and acronyms and abbreviations.
E. Durant McArthur
2004-01-01
Restoring Western Ranges and Wildlands has had a fairly long gestation period. The final product of three volumes had its beginnings in 1983. At that time research administrators of the Intermountain Forest and Range Experiment Station (now part of the Rocky Mountain Research Station) had obtained funding from the Four Corners Regional Commission (FCRC) to produce a...
2011-07-10
CAPE CANAVERAL, Fla. – A crane working from the dock at Hangar AF at Cape Canaveral Air Force Station in Florida removes one of the spools holding the parachutes and lines from the right spent boosters from space shuttle Atlantis' final launch. The parachutes and booster were gathered by the crews from the Liberty Star, one of NASA's solid rocket booster retrieval ships. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-084 (1 June 2011) --- Space shuttle Endeavour approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-080 (1 June 2011) --- Space shuttle Endeavour lands on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-066 (1 June 2011) --- Space shuttle Endeavour approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
Final Landing of the Space Shuttle Endeavour / STS-134 Mission
2011-06-01
STS134-S-068 (1 June 2011) --- Space shuttle Endeavour lands on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. (EDT) on June 1, 2011, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Onboard are NASA astronauts Mark Kelly, STS-134 commander; Greg H. Johnson, pilot; Michael Fincke, Andrew Feustel, Greg Chamitoff and European Space Agency astronaut Roberto Vittori, all mission specialists. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA
38. From Final Construction Report on the Haleakala Road ProjectNR7, ...
38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata puts on his helmet as part of the final fitting of his launch and entry suit. Wakata is making his third shuttle flight. He will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
SPX-8 SpaceX Dragon Spacecraft Approach
2016-04-10
iss047e050943 (4/10/2016) --- The SpaceX Dragon cargo spaceship begins the final approach to the International Space Station. On the left, the solar arrays of Orbital ATK’s Cygnus cargo craft can be seen. Dragon’s arrival marked the first time two commercial cargo vehicles have been docked simultaneously at the space station. Orbital ATK’s Cygnus spacecraft arrived to the station just over two weeks ago. With the arrival of Dragon, the space station ties the record for most vehicles on station at one time – six. The spacecraft is delivering about 7,000 pounds of science and research investigations, including the Bigelow Expandable Activity Module, known as BEAM.
Automated Meteor Detection by All-Sky Digital Camera Systems
NASA Astrophysics Data System (ADS)
Suk, Tomáš; Šimberová, Stanislava
2017-12-01
We have developed a set of methods to detect meteor light traces captured by all-sky CCD cameras. Operating at small automatic observatories (stations), these cameras create a network spread over a large territory. Image data coming from these stations are merged in one central node. Since a vast amount of data is collected by the stations in a single night, robotic storage and analysis are essential to processing. The proposed methodology is adapted to data from a network of automatic stations equipped with digital fish-eye cameras and includes data capturing, preparation, pre-processing, analysis, and finally recognition of objects in time sequences. In our experiments we utilized real observed data from two stations.
Ground control station software design for micro aerial vehicles
NASA Astrophysics Data System (ADS)
Walendziuk, Wojciech; Oldziej, Daniel; Binczyk, Dawid Przemyslaw; Slowik, Maciej
2017-08-01
This article describes the process of designing the equipment part and the software of a ground control station used for configuring and operating micro unmanned aerial vehicles (UAV). All the works were conducted on a quadrocopter model being a commonly accessible commercial construction. This article contains a characteristics of the research object, the basics of operating the micro aerial vehicles (MAV) and presents components of the ground control station model. It also describes the communication standards for the purpose of building a model of the station. Further part of the work concerns the software of the product - the GIMSO application (Generally Interactive Station for Mobile Objects), which enables the user to manage the actions and communication and control processes from the UAV. The process of creating the software and the field tests of a station model are also presented in the article.
12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...
12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA
Study on the construction of Intelligent Courier Station Model
NASA Astrophysics Data System (ADS)
zhao, Ce; lu, Jia xin; li, Zhuang zhuang; shao, Zi rong; pi, Kun yi
2018-06-01
Campus Express is an important window to observe the city consumption logistics service "last kilometer".The research on Campus Express service is not only conducive to campus environment improvement and service quality promotion, but also provides all types of community, agglomeration areas such as urban terminal "last kilometer" logistics with reference.This article first proposed the main problems of campus express service,analyzed the mode of smart express station and finally built a smart express station.
Work Station For Inverting Solar Cells
NASA Technical Reports Server (NTRS)
Feder, H.; Frasch, W.
1982-01-01
Final work station along walking-beam conveyor of solar-array assembly line turns each pretabbed solar cell over, depositing it back-side-up onto landing pad, which centers cell without engaging collector surface. Solar cell arrives at inverting work station collector-side-up with two interconnect tabs attached to collector side. Cells are inverted so that second soldering operation takes place in plain view of operator. Inversion protects collector from damage when handled at later stages of assembly.
Space Station Crew Discusses Life in Space with Massachusetts Media
2018-02-05
Aboard the International Space Station, Expedition 54 Flight Engineers Mark Vande Hei and Scott Tingle of NASA discussed life and research on the orbital outpost during a pair of in-flight interviews Feb. 5 with WHDH-TV, Boston and Bloomberg Bay State Radio. Vande Hei is in the final weeks of his five and a half month mission on the station, while Tingle, a Massachusetts native, will remain on the complex until early June.
2004-09-13
ISS009-E-22465 (13 September 2004) --- Hurricane Ivan was photographed as it entered the Gulf of Mexico late Monday (22:36:24 GMT, Sept. 13) by astronaut Edward M. (Mike) Fincke aboard the International Space Station, 230 miles above Earth. At the time, Ivan was a category 5 hurricane with winds of 160 mph. Fincke, the NASA Station Science Officer, and Station Commander Gennady Padalka are in the final month of a six-month mission aboard the research platform.
2004-09-26
ISS009-E-22466 (13 September 2004) --- Hurricane Ivan was photographed as it entered the Gulf of Mexico late Monday (22:36:31 GMT, Sept. 13) by astronaut Edward M. (Mike) Fincke aboard the International Space Station, 230 miles above Earth. At the time, Ivan was a category 5 hurricane with winds of 160 mph. Fincke, the NASA Station Science Officer, and Station Commander Gennady Padalka are in the final month of a six-month mission aboard the research platform.
2004-09-13
ISS009-E-22497 (13 September 2004) --- Hurricane Ivan was photographed as it entered the Gulf of Mexico late Monday (22:39:23 GMT, Sept. 13) by astronaut Edward M. (Mike) Fincke aboard the International Space Station, 230 miles above Earth. At the time, Ivan was a category 5 hurricane with winds of 160 mph. Fincke, the NASA Station Science Officer, and Station Commander Gennady Padalka are in the final month of a six-month mission aboard the research platform.
2004-09-13
ISS009-E-22471 (13 September 2004) --- Hurricane Ivan was photographed as it entered the Gulf of Mexico late Monday (22:36:49 GMT, Sept. 13) by astronaut Edward M. (Mike) Fincke aboard the International Space Station, 230 miles above Earth. At the time, Ivan was a category 5 hurricane with winds of 160 mph. Fincke, the NASA Station Science Officer, and Station Commander Gennady Padalka are in the final month of a six-month mission aboard the research platform.
OA-7 Veggie Series 1 Processing
2017-02-15
Charles Spern, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
Biomass power for rural development. Technical progress report, October 1--December 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.« less
46 CFR 30.10-5b - Cargo control station-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Cargo control station-TB/ALL. 30.10-5b Section 30.10-5b Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-5b Cargo control station—TB/ALL. The term cargo control station means a location that is manned...
46 CFR 30.10-5b - Cargo control station-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Cargo control station-TB/ALL. 30.10-5b Section 30.10-5b Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-5b Cargo control station—TB/ALL. The term cargo control station means a location that is manned...
46 CFR 30.10-5b - Cargo control station-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Cargo control station-TB/ALL. 30.10-5b Section 30.10-5b Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-5b Cargo control station—TB/ALL. The term cargo control station means a location that is manned...
46 CFR 30.10-5b - Cargo control station-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Cargo control station-TB/ALL. 30.10-5b Section 30.10-5b Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-5b Cargo control station—TB/ALL. The term cargo control station means a location that is manned...
46 CFR 30.10-5b - Cargo control station-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Cargo control station-TB/ALL. 30.10-5b Section 30.10-5b Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-5b Cargo control station—TB/ALL. The term cargo control station means a location that is manned...
Improving liquid bait programs for Argentine ant control: bait station density.
Nelson, Erik H; Daane, Kent M
2007-12-01
Argentine ants, Linepithema humile (Mayr), have a positive effect on populations of mealybugs (Pseudococcus spp.) in California vineyards. Previous studies have shown reductions in both ant activity and mealybug numbers after liquid ant baits were deployed in vineyards at densities of 85-620 bait stations/ha. However, bait station densities may need to be <85 bait stations/ha before bait-based strategies for ant control are economically comparable to spray-based insecticide treatments-a condition that, if met, will encourage the commercial adoption of liquid baits for ant control. This research assessed the effectiveness of baits deployed at lower densities. Two field experiments were conducted in commercial vineyards. In experiment 1, baits were deployed at 54-225 bait stations/ha in 2005 and 2006. In experiment 2, baits were deployed at 34-205 bait stations/ha in 2006 only. In both experiments, ant activity and the density of mealybugs in grape fruit clusters at harvest time declined with increasing bait station density. In 2005 only, European fruit lecanium scale [Parthenolecanium corni (Bouché)] were also present in fruit clusters, and scale densities were negatively related to bait station density. The results indicate that the amount of ant and mealybug control achieved by an incremental increase in the number of bait stations per hectare is constant across a broad range of bait station densities. The results are discussed in the context of commercializing liquid ant baits to provide a more sustainable Argentine ant control strategy.
2011-07-10
CAPE CANAVERAL, Fla. - Liberty Star, one of NASA's solid rocket booster retrieval ships, maneuvers the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, maneuvers the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows a spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. – The right spent booster from space shuttle Atlantis' final launch is towed by the Liberty Star, one of NASA's solid rocket booster retrieval ships to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. – The right spent booster from space shuttle Atlantis' final launch is towed by the Liberty Star, one of NASA's solid rocket booster retrieval ships to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows a spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows a spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8. STS-135 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-10
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows the right spent booster from space shuttle Atlantis' final launch, as it is taken to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-08
CAPE CANAVERAL, Fla. -- Liberty Star, one of NASA's solid rocket booster retrieval ships, tows a spent booster from space shuttle Atlantis' final launch, to Port Canaveral in Florida. The shuttle's two solid rocket booster casings and associated flight hardware are recovered in the Atlantic Ocean after every launch by Freedom Star and Liberty Star. The boosters impact the Atlantic about seven minutes after liftoff and the retrieval ships are stationed about 10 miles from the impact area at the time of splashdown. After the spent segments are processed, they will be transported to Utah, where they will be deserviced and stored, if needed. Atlantis began its final flight at 11:29 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also delivers the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit to the station. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
Development of a preprototype trace contaminant control system. [for space stations
NASA Technical Reports Server (NTRS)
1977-01-01
The steady state contaminant load model based on shuttle equipment and material test programs, and on the current space station studies was revised. An emergency upset contaminant load model based on anticipated emergency upsets that could occur in an operational space station was defined. Control methods for the contaminants generated by the emergency upsets were established by test. Preliminary designs of both steady state and emergency contaminant control systems for the space station application are presented.
Suman, Devi Shankar; Wang, Yi; Unlu, Isik; Williges, Eric; Williams, Gregory M.; Gaugler, Randy
2016-01-01
Background The Asian tiger mosquito, Aedes albopictus, is a vector of dengue, Chikungunya, and Zika viruses. This mosquito inhabits a wide range of artificial water-holding containers in urban and suburban areas making it difficult to control. We tested the hypothesis that female-driven autodissemination of an insect growth regulator could penetrate cryptic oviposition habitats difficult to treat with conventional insecticidal sprays. Methodology Oviposition preferences of Ae. albopictus females for open and cryptic cups were tested in semi-field experiments. Two conventional larvicidal sprayers were tested to determine droplet penetration and larvicidal efficacy in open and cryptic habitats using Bacillus thuringiensis var. israelensis (Bti) in the field. Finally, the efficacy of pyriproxyfen autodissemination stations was assessed in cryptic and open cups in residential areas during 2013 and 2014. Principal Findings Gravid females strongly preferred cryptic (53.1±12.9 eggs/cup) over open (10.3±4.3 eggs/cup) cups for oviposition. Cryptic cups showed limited droplet penetration and produced 0.1–0.3% larval mortality with a conventional backpack and low-volume sprays of Bti. The autodissemination stations effectively contaminated these cryptic cups (59.3–84.6%) and produced 29.7–40.8% pupal mortality during 2013–2014. Significant pupal mortality was also observed in open cups. Conclusions The autodissemination station effectively exploits the oviposition behavior of wild gravid females to deliver pyriproxyfen to targeted oviposition habitats. Although the pupal mortality in cryptic cups was relatively lower than expected for the effective vector control. Autodissemination approach may be a suitable supporting tool to manage Ae. albopictus immatures in the cryptic habitats those are less accessible to conventional larvicidal sprays. PMID:28033379
Staffing the ISS Control Centers: Lessons Learned from Long-Duration Human Space Flight
NASA Technical Reports Server (NTRS)
Olsen, Carrie D.; Horvath, Timothy J.; Davis, Sally P.
2006-01-01
The International Space Station (ISS) has been in operation with a permanent human presence in space for over five years, and plans for continued operations stretch ten years into the future. Ground control and support operations are, likewise, a 15-year enterprise. This long-term, 24-hour per day, 7 day per week support has presented numerous challenges in the areas of ground crew training, initial and continued certification, and console staffing. The Mission Control Center in Houston, Texas and the Payload Operations Center in Huntsville, Alabama have both tackled these challenges, with similar, yet distinct, approaches. This paper describes the evolution of the staffing and training policies of both control centers in a chronological progression. The relative merits and shortcomings of the various policies employed are discussed and a summary of "lessons learned" is presented. Finally, recommendations are made as best practices for future long-term space missions.
Zero-Propellant Maneuver[TM] Flight Results for 180 deg ISS Rotation
NASA Technical Reports Server (NTRS)
Bedrossian, Nazareth; Bhatt, Sagar; Lammers, Mike; Nguyen, Louis
2007-01-01
This paper presents results for the Zero Propellant Maneuver (ZPM) TradeMark attitude control concept flight demonstration. On March 3, 2007, a ZPM was used to reorient the International Space Station 180 degrees without using any propellant. The identical reorientation performed with thrusters would have burned 110lbs of propellant. The ZPM was a pre-planned trajectory used to command the CMG attitude hold controller to perform the maneuver between specified initial and final states while maintaining the CMGs within their operational limits. The trajectory was obtained from a PseudoSpectral solution to a new optimal attitude control problem. The flight test established the breakthrough capability to simultaneously perform a large angle attitude maneuver and momentum desaturation without the need to use thrusters. The flight implementation did not require any modifications to flight software. This approach is applicable to any spacecraft that are controlled by momentum storage devices.
47 CFR 74.635 - Unattended operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Stations § 74.635 Unattended operation. (a) TV relay stations, TV translator relay stations, TV STL... persons; (3) TV relay stations, TV STL stations, TV translator relay stations, and TV microwave booster... control point. Additionally, a TV translator relay station (and any associated TV microwave booster...
The Thirty Meter Telescope Site Testing Robotic Computer System
NASA Astrophysics Data System (ADS)
Riddle, Reed L.; Schöck, M.; Skidmore, W.; Els, S.; Travouillon, T.
2008-03-01
The Thirty Meter Telescope (TMT) project is currently testing five remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote, they require a control system that can automatically manage the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This is a discussion of the TMT site testing robotic computer system as implemented.
Satellite Communications for Unmanned Aircraft C2 Links: C-Band, Ku-Band and Ka-Band
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Wilson, Jeffrey D.; Bishop, William D.
2016-01-01
Unmanned aircraft (UA) that require access to controlled (or non-segregated) airspace require a highly reliable and robust command and control (C2) link, operating over protected aviation spectrum. While operating within radio line-of-sight (LOS) UA can make use of air-to-ground C2 links to terrestrial stations. When operating beyond LOS (BLOS) where a group of networked terrestrial stations does not exist to provide effective BLOS coverage, a satellite communications link is required. Protected aviation spectrum for satellite C2 links has only recently been allocated in bands where operational satellites exist. A previously existing C-Band allocation covers a bands where there are currently no operational satellites. The new allocations, within the Fixed Satellite Service bands at Ku and Ka-Bands will not be finalized until 2023 due to the need for the development of standards and technical decisions on the operation of UA satellite C2 links within these bands. This paper provides an overview of BLOS satellite C2 links, some of the conditions which will need to be met for the operation of such links, and a look at some aspects of spectrum sharing which may constrain these operations.
2001-07-11
KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis is ready for final launch preparations. The orbiter access arm is extended to the orbiter to allow entry into Atlantis. The White Room at the end is the point of entry, and is an environmentally controlled room where the Shuttle crew have final adjustments made to their launch and entry suits. At the lower end of Atlantis are the tail service masts, in front of either wing. The masts support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft T-0 umbilicals. Viewed in the background is the Atlantic Ocean. Launch on mission STS-104 is scheduled for 5:04 a.m. July 12. The launch is the 10th assembly flight to the International Space Station. Along with a crew of five, Atlantis will carry the joint airlock module as primary payload
Space Station Environmental Control/Life Support System engineering
NASA Technical Reports Server (NTRS)
Miller, C. W.; Heppner, D. B.
1985-01-01
The present paper is concerned with a systems engineering study which has provided an understanding of the overall Space Station ECLSS (Environmental Control and Life Support System). ECLSS/functional partitioning is considered along with function criticality, technology alternatives, a technology description, single thread systems, Space Station architectures, ECLSS distribution, mechanical schematics per space station, and Space Station ECLSS characteristics. Attention is given to trade studies and system synergism. The Space Station functional description had been defined by NASA. The ECLSS will utilize technologies which embody regenerative concepts to minimize the use of expendables.
76 FR 33346 - Final Supplementary Rules for the Upper Snake Field Office, Idaho
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
... were placed at key locations in the greater planning area and contained comment cards that helped... prohibiting recreational vehicle (RV) owners from dumping their tanks at the dump station at Byington. The... prohibited from emptying their tanks in the dump station at Byington boat access. The capacity of the dump...
78 FR 42487 - Announcement of Grant Application Deadlines; Deadlines and Funding Levels
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... full digital transition of their stations across all equipment. Rural stations often have translators... FCC deadline did not apply to translators, and in 2011 the FCC adopted a final deadline for analog-to-digital conversion of all translators by September 1, 2015. Because of this, translators have been allowed...
77 FR 29589 - Announcement of Grant Application Deadlines and Funding Levels
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... transition of their stations across all equipment. Rural stations often have translators serving small or... not apply to translators, and only recently in 2011 the FCC adopted a final deadline for analog-to-digital conversion of all translators by September 1, 2015. Because of this, translators have been allowed...
Space Station: Delays in dealing with space debris may reduce safety and increase costs
NASA Astrophysics Data System (ADS)
1992-06-01
The majority of NASA's current designs for protecting the space station and crew from debris are outdated and its overall debris protection strategy is insufficient. NASA's contractors have designed the station using a 1984 model of the space environment that is obsolete, significantly underestimating the increasing amount of debris that the station will encounter during its 30-year lifetime. In February 1992, NASA directed its space centers to incorporate an updated 1991 model into their designs. However, the agency has not yet made critical decisions on how to implement this change. Preliminary evaluations show that incorporating the 1991 model using currently established safety criteria could entail a major redesign of some components, with significant cost impact and schedule delays. NASA's overall protection strategy for space debris is insufficient. While NASA has concentrated its protection on shielding the space station from small debris and plans to augment this initial shielding in orbit, it has not yet developed designs or studied the cost and operational impact of augmenting its protection with additional shielding. Further, current designs do not provide the capability of warning or protecting the crew from imminent collision with mid-size debris. Finally, although some capabilities exist for maneuvering the station away from large debris, the agency lacks collision-avoidance plans and debris-tracking equipment. In developing a comprehensive strategy to protect the station from the more severe debris environment, NASA cannot avoid some difficult decisions. These decisions involve tradeoffs between how much the agency is willing to pay to protect the station, the schedule delays it may incur, and the risk to station safety it is willing to accept. It is important that these decisions be made before NASA completes its critical design reviews in early 1993. At that time key designs will be made final and manufacturing will begin. Without a comprehensive strategy, NASA will have decided to build the station, knowing the consequences of this decision on station and crew safety, and on life-cycle station cost.
Summary of the Science performed onboard the International Space Station during Increments 12 and 13
NASA Technical Reports Server (NTRS)
Jules, Kenol
2007-01-01
By September of 2007, continuous human presence on the International Space Station will reach a milestone of eighty months. The many astronauts and cosmonauts, who live onboard the station during the last fourteen Increments over that time span, spend their time building the station as well as performing science on a daily basis. Over those eighty months, the U.S astronauts crew members logged over 2954 hours of research time. Far more research time has been accumulated by experiments controlled by investigators on the ground. The U.S astronauts conducted over one hundred and twenty six (126) science investigations. From these hundred and twenty six science investigations, many were operated across multiple Increments. The crew also installed, activated and operated nine (9) science racks that supported six science disciplines ranging from material sciences to life science. By the end of Increment 14, a total of 5083 kg of research rack mass were ferried to the station as well as 5021 kg of research mass. The objectives of this paper are three-fold. (1) To briefly review the science conducted on the International Space Station during the previous eleven Increments; (2) to discuss in detail the science investigations that were conducted on the station during Increments 12 and 13. The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, some preliminary science results will be discussed for each of the investigation as science results availability permit. (3) The paper will briefly touch on what the science complement planning was and what was actually accomplished due to real time science implementation and challenges during these two Increments in question to illustrate the challenges of daily science activity while the science platform is under construction. Finally, the paper will briefly discuss the science research complements for the other two Increments, Increments 14 and 15, to preview how much science might be accomplished during these two Increments.
Work/control stations in Space Station weightlessness
NASA Technical Reports Server (NTRS)
Willits, Charles
1990-01-01
An ergonomic integration of controls, displays, and associated interfaces with an operator, whose body geometry and dynamics may be altered by the state of weightlessness, is noted to rank in importance with the optimal positioning of controls relative to the layout and architecture of 'body-ported' work/control stations applicable to the NASA Space Station Freedom. A long-term solution to this complex design problem is envisioned to encompass the following features: multiple imaging, virtual optics, screen displays controlled by a keyboard ergonomically designed for weightlessness, cursor control, a CCTV camera, and a hand-controller featuring 'no-grip' vernier/tactile positioning. This controller frees all fingers for multiple-switch actuations, while retaining index/register determination with the hand controller. A single architectural point attachment/restraint may be used which requires no residual muscle tension in either brief or prolonged operation.
Tethered Vehicle Control and Tracking System
NASA Technical Reports Server (NTRS)
North, David D. (Inventor); Aull, Mark J. (Inventor)
2017-01-01
A kite system includes a kite and a ground station. The ground station includes a sensor that can be utilized to determine an angular position and velocity of the kite relative to the ground station. A controller utilizes a fuzzy logic control system to autonomously fly the kite. The system may include a ground station having powered winding units that generate power as the lines to the kite are unreeled. The control system may be configured to fly the kite in a crosswind trajectory to increase line tension for power generation. The sensors for determining the position of the kite are preferably ground-based.
Tethered Vehicle Control and Tracking System
NASA Technical Reports Server (NTRS)
North, David D. (Inventor); Aull, Mark J. (Inventor)
2014-01-01
A kite system includes a kite and a ground station. The ground station includes a sensor that can be utilized to determine an angular position and velocity of the kite relative to the ground station. A controller utilizes a fuzzy logic control system to autonomously fly the kite. The system may include a ground station having powered winding units that generate power as the lines to the kite are unreeled. The control system may be configured to fly the kite in a crosswind trajectory to increase line tension for power generation. The sensors for determining the position of the kite are preferably ground-based.
View northeast of a microchip based computer control system installed ...
View northeast of a microchip based computer control system installed in the early 1980's to replace Lamokin Tower, at center of photograph; panels 1 and 2 at right of photograph are part of main supervisory board; panel 1 controlled Allen Lane sub-station #7; responsiblity for this portion of the system was transferred to southeast Pennsylvania transit authority (septa) in 1985; panel 2 at extreme right controls catenary switches in a coach storage yard adjacent to the station - Thirtieth Street Station, Power Director Center, Thirtieth & Market Streets in Amtrak Railroad Station, Philadelphia, Philadelphia County, PA
Design-Tradeoff Model For Space Station
NASA Technical Reports Server (NTRS)
Chamberlain, Robert G.; Smith, Jeffrey L.; Borden, Chester S.; Deshpande, Govind K.; Fox, George; Duquette, William H.; Dilullo, Larry A.; Seeley, Larry; Shishko, Robert
1990-01-01
System Design Tradeoff Model (SDTM) computer program produces information which helps to enforce consistency of design objectives throughout system. Mathematical model of set of possible designs for Space Station Freedom. Program finds particular design enabling station to provide specified amounts of resources to users at lowest total (or life-cycle) cost. Compares alternative design concepts by changing set of possible designs, while holding specified services to users constant, and then comparing costs. Finally, both costs and services varied simultaneously when comparing different designs. Written in Turbo C 2.0.
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. At far left is Dena Richmond, ESC configuration management. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
Forward view of the ISS taken during final flyaround
2001-04-29
S100-E-5958 (29 April 2001) --- Backdropped against the blue and white Earth and sporting a readily visible new addition in the form of the Canadarm2 or space station robotic arm, the International Space Station (ISS) was photographed following separation from the Space Shuttle Endeavour. With six astronauts and a Rosaviakosmos cosmonaut aboard the shuttle, the spacecraft performed a fly-around survey of the station, which was inhabited by two astronauts and a Russian cosmonaut. The image was recorded with a digital still camera.
D'Occhio, Michael J; Fordyce, Geoffry; Whyte, Tim R; Jubb, Tristan F; Fitzpatrick, Lee A; Cooper, Neil J; Aspden, William J; Bolam, Matt J; Trigg, Timothy E
2002-12-16
The ability of gonadotrophin releasing hormone (GnRH) agonist implants to suppress ovarian activity and prevent pregnancies, long-term, was examined in heifers and cows maintained under extensive management. At three cattle stations, heifers (2-year-old) and older cows (3- to 16-year-old) were assigned to a control group that received no treatment, or were treated with high-dose (12 mg, Station A) or low-dose (8 mg, Station B and Station C) GnRH agonist implants. The respective numbers of control and GnRH agonist-treated animals (heifers + cows) at each station were: Station A, 20 and 99; Station B, 19 and 89; Station C, 20 and 76. Animals were maintained with 4% bulls and monitored for pregnancy at 2-monthly intervals for approximately 12 months. Pregnancy rates for control heifers and control cows ranged from 60-90% and 80-100%, respectively, depending on the study site. The respective number of animals (heifers + cows) treated with GnRH agonist that conceived, and days to first conception, were: Station A, 9 (9%) and 336 +/- 3 days; Station B, 8 (10%) and 244 +/- 13 days; Station C, 20 (26%) and 231 +/- 3 days. Treatment with high-dose GnRH agonist prevented pregnancies for longer (approximately 300 days) than treatment with low-dose GnRH agonist (approximately 200 days). In the majority of heifers and cows treated with GnRH agonist, ovarian follicular growth was restricted to early antral follicles (2-4mm). The findings indicate that GnRH agonist implants have considerable potential as a practical technology to suppress ovarian activity and control reproduction in female cattle maintained in extensive rangelands environments. The technology also has broader applications in diverse cattle production systems. Copyright 2002 Elsevier Science B.V.
35. From Final Construction Report on the Haleakala Road ProjectNR7, ...
35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI
The transportation depot: An orbiting vehicle support facility
NASA Technical Reports Server (NTRS)
Kaszubowski, Martin J.; Ayers, J. Kirk
1992-01-01
This paper describes the details of an effort to produce conceptual designs for an orbiting platform, called a transportation depot, to handle assembly and processing of lunar, Martian, and related vehicles. High-level requirements for such a facility were established, and several concepts were developed to meet those requirements. By showing that the critical rigid-body momentum characteristics of each concept are similar to those of the dual-keel space station, some insight was gained about the controllability and utility of this type of facility. Finally, several general observations were made that highlight the advantages and disadvantages of particular design features.
Resource sharing on CSMA/CD networks in the presence of noise. M.S. Thesis
NASA Technical Reports Server (NTRS)
Dinschel, Duane Edward
1987-01-01
Resource sharing on carrier sense multiple access with collision detection (CSMA/CD) networks can be accomplished by using window-control algorithms for bus contention. The window-control algorithms are designed to grant permission to transmit to the station with the minimum contention parameter. Proper operation of the window-control algorithm requires that all stations sense the same state of the newtork in each contention slot. Noise causes the state of the network to appear as a collision. False collisions can cause the window-control algorithm to terminate without isolating any stations. A two-phase window-control protocol and approximate recurrence equation with noise as a parameter to improve the performance of the window-control algorithms in the presence of noise are developed. The results are compared through simulation, with the approximate recurrence equation yielding the best overall performance. Noise is even a bigger problem when it is not detected by all stations. In such cases it is possible for the window boundaries of the contending stations to become out of phase. Consequently, it is possible to isolate a station other than the one with the minimum contention parameter. To guarantee proper isolation of the minimum, a broadcast phase must be added after the termination of the algorithm. The protocol required to correct the window-control algorithm when noise is not detected by all stations is discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grier, H.E.
1985-09-01
An automatic remote-control system armed and fired the bomb and sent out a sequence of time signals to experimental equipment on the atoll. A central station at Parry Island sent signals via submarine cables to a timer station on a shot island. The timer station controlled signals to the zero station and to experiments on the island, and through auxiliary stations, it also controlled signal distribution on adjacent islands. Light-sensitive triggering units for apparatus and for accurate standard zero-time reference were provided in the form of Blue Boxes, or fiducial markers.
47 CFR 90.305 - Location of stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... stations. (a) The transmitter site(s) for base station(s), including mobile relay stations, shall be.... (b) Mobile units shall be operated within 48 km. (30 mi.) of their associated base station or...). (c) Control stations must be located within the area of operation of the mobile units. (d) Base and...
2011-09-19
CAPE CANAVERAL, Fla. – Astronauts from Space Shuttle Atlantis’ STS-135 mission return to the Training Auditorium at NASA’s Kennedy Space Center for the traditional post-flight crew return presentation. Commander Chris Ferguson meets with audience members to share personal stories about the crew’s successful 13-day mission to the International Space Station. STS-135 Mission Specialist Rex Walheim was unable to attend the Kennedy event. In July 2011, Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis and the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann
2011-09-19
CAPE CANAVERAL, Fla. – Astronauts from space shuttle Atlantis’ STS-135 mission return to the Training Auditorium at NASA’s Kennedy Space Center for the traditional post-flight crew return presentation. Having completed their successful 13-day mission to the International Space Station, (from left) Mission Specialist Sandra Magnus, Pilot Doug Hurley and Commander Chris Ferguson share personal stories of their experiences. STS-135 Mission Specialist Rex Walheim was unable to attend the Kennedy event. In July 2011, Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis and the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann
2011-06-01
CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, NASA managers brief media after space shuttle Endeavour's successful landing and conclusion of its STS-134 and final mission. From left are, Associate Administrator for Space Operations Bill Gerstenmaier, Space Shuttle Program Launch Integration Manager Mike Moses; and Shuttle Launch Director Mike Leinbach. Endeavour and its crew delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kim Shiflett
2011-06-01
CAPE CANAVERAL, Fla. -- Workers measured and marked the spot where shuttle Endeavour's nose gear came to a stop after the vehicle's final return from space completing a 16-day, 6.5-million-mile STS-134 mission. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kim Shiflett
2011-06-01
CAPE CANAVERAL, Fla. -- Astronaut Rick Sturckow flies weather reconnaissance in a Shuttle Training Aircraft over NASA's Kennedy Space Center in Florida to assess conditions before space shuttle Endeavour returns to Earth for the final time. Weather was observed "go" and Endeavour glided to a stop on the Shuttle Landing Facility's Runway 15 at 2:35 a.m. EDT, bringing an end to the STS-134 mission. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Tony Gray
The Apollo 17 mare basalts: Serenely sampling Taurus-Littrow
NASA Technical Reports Server (NTRS)
Neal, Clive R.; Taylor, Lawrence A.
1992-01-01
As we are all aware, the Apollo 17 mission marked the final manned lunar landing of the Apollo program. The lunar module (LM) landed approximately 0.7 km due east of Camelot Crater in the Taurus-Littrow region on the southwestern edge of Mare Serenitatis. Three extravehicular activities (EVA's) were performed, the first concentrating around the LM and including station 1 approximately 1.1 km south-southeast of the LM at the northwestern edge of Steno Crater. The second traversed approximately 8 km west of the LM to include stations 2, 3, 4, and 5, and the third EVA traversed approximately 4.5 km to the northwest of the LM to include stations 6, 7, 8, and 9. This final manned mission returned the largest quantity of lunar rock samples, 110.5 kg/243.7 lb, and included soils, breccias, highland samples, and mare basalts. This abstract concentrates upon the Apollo 17 mare basalt samples.
Capabilities and Present Status of The Sicaya Radio Telescope in Peru
NASA Astrophysics Data System (ADS)
Ishitsuka, J. K.; Kobayashi, H.; Miyoshi, M.
2017-07-01
The private telephone company, Telefónica del Perú, stopped operations of the Sicaya Intelsat Station in 2000, we knew that they were looking for some institution to own the Station in 2002 and begun conversations. Finally in 2008, the whole communications station with a 32-meters parabolic antenna was donated to the Geophysical Institute of Peru. Many things have happened since that, but finally we are almost ready to have a radio telescope. National Astronomical Observatory of Japan contributed enormously to set up the radio telescope. Initially as a single dish radio telescope, it will observe methanol maser at 6.7 GHz of young stellar objects. In the near future, equipping for VLBI observations is in the scope. Sicaya is situated on the central part of Peru at 3,370 meters of altitude and the weather is benign for radio astronomical observations, also humidity is low and allows have radio telescopes free of rust.
The Apollo 17 mare basalts: Serenely sampling Taurus-Littrow
NASA Astrophysics Data System (ADS)
Neal, Clive R.; Taylor, Lawrence A.
1992-12-01
As we are all aware, the Apollo 17 mission marked the final manned lunar landing of the Apollo program. The lunar module (LM) landed approximately 0.7 km due east of Camelot Crater in the Taurus-Littrow region on the southwestern edge of Mare Serenitatis. Three extravehicular activities (EVA's) were performed, the first concentrating around the LM and including station 1 approximately 1.1 km south-southeast of the LM at the northwestern edge of Steno Crater. The second traversed approximately 8 km west of the LM to include stations 2, 3, 4, and 5, and the third EVA traversed approximately 4.5 km to the northwest of the LM to include stations 6, 7, 8, and 9. This final manned mission returned the largest quantity of lunar rock samples, 110.5 kg/243.7 lb, and included soils, breccias, highland samples, and mare basalts. This abstract concentrates upon the Apollo 17 mare basalt samples.
Automated Subsystem Control for Life Support System (ASCLSS)
NASA Technical Reports Server (NTRS)
Block, Roger F.
1987-01-01
The Automated Subsystem Control for Life Support Systems (ASCLSS) program has successfully developed and demonstrated a generic approach to the automation and control of space station subsystems. The automation system features a hierarchical and distributed real-time control architecture which places maximum controls authority at the lowest or process control level which enhances system autonomy. The ASCLSS demonstration system pioneered many automation and control concepts currently being considered in the space station data management system (DMS). Heavy emphasis is placed on controls hardware and software commonality implemented in accepted standards. The approach demonstrates successfully the application of real-time process and accountability with the subsystem or process developer. The ASCLSS system completely automates a space station subsystem (air revitalization group of the ASCLSS) which moves the crew/operator into a role of supervisory control authority. The ASCLSS program developed over 50 lessons learned which will aide future space station developers in the area of automation and controls..
2. NORTH SIDE OF THE CONTROL STATION OPERATIONS BUILDING SHOWING ...
2. NORTH SIDE OF THE CONTROL STATION OPERATIONS BUILDING SHOWING MISSION REVIVAL FACADE. A TELECOMMUNICATIONS BUILDING CONSTRUCTED IN THE 1980s IS ADJACENT AT PHOTO-CENTER, AND COTTAGE 111 (PRESENTLY USED AS THE HYDROGRAPHER'S OFFICE) IS VISIBLE AT PHOTORIGHT. VIEW TO SOUTH. - Bishop Creek Hydroelectric System, Control Station, Bishop Creek, Bishop, Inyo County, CA
NASA Technical Reports Server (NTRS)
Morgan, E. L.; Young, R. C.; Smith, M. D.; Eagleson, K. W.
1986-01-01
The objective of this study was to evaluate proposed design characteristics and applications of automated biomonitoring devices for real-time toxicity detection in water quality control on-board permanent space stations. Simulated tests in downlinking transmissions of automated biomonitoring data to Earth-receiving stations were simulated using satellite data transmissions from remote Earth-based stations.
Garfield, R
1999-07-31
Throughout Central America, a traditional malaria control strategy (depending on heavy use of organic pesticides) became less effective during the 1970s. In Nicaragua, an alternative strategy, based on frequent local epidemiological assessments and community participation, was developed in the 1980s. Despite war-related social instability, and continuing vector resistance, this approach was highly successful. By the end of the contra war, there finally existed organisational and ecological conditions that favoured improved malaria control. Yet the expected improvements did not occur. In the 1990s, Nicaragua experienced its worst recorded malaria epidemics. This situation was partly caused by the country's macroeconomic structural adjustment programme. Volunteers now take fewer slides and provide less treatment, malaria control workers are less motivated by the spirit of public service, and some malaria control stations charge for diagnosis or treatment. To "roll back malaria", in Nicaragua at least, will require the roll-back of some erroneous aspects of structural adjustment.
Efficient placement of structural dynamics sensors on the space station
NASA Technical Reports Server (NTRS)
Lepanto, Janet A.; Shepard, G. Dudley
1987-01-01
System identification of the space station dynamic model will require flight data from a finite number of judiciously placed sensors on it. The placement of structural dynamics sensors on the space station is a particularly challenging problem because the station will not be deployed in a single mission. Given that the build-up sequence and the final configuration for the space station are currently undetermined, a procedure for sensor placement was developed using the assembly flights 1 to 7 of the rephased dual keel space station as an example. The procedure presented approaches the problem of placing the sensors from an engineering, as opposed to a mathematical, point of view. In addition to locating a finite number of sensors, the procedure addresses the issues of unobserved structural modes, dominant structural modes, and the trade-offs involved in sensor placement for space station. This procedure for sensor placement will be applied to revised, and potentially more detailed, finite element models of the space station configuration and assembly sequence.
Prototype space station automation system delivered and demonstrated at NASA
NASA Technical Reports Server (NTRS)
Block, Roger F.
1987-01-01
The Automated Subsystem Control for Life Support System (ASCLSS) program has successfully developed and demonstrated a generic approach to the automation and control of Space Station subsystems. The hierarchical and distributed real time controls system places the required controls authority at every level of the automation system architecture. As a demonstration of the automation technique, the ASCLSS system automated the Air Revitalization Group (ARG) of the Space Station regenerative Environmental Control and Life Support System (ECLSS) using real-time, high fidelity simulators of the ARG processess. This automation system represents an early flight prototype and an important test bed for evaluating Space Station controls technology including future application of ADA software in real-time control and the development and demonstration of embedded artificial intelligence and expert systems (AI/ES) in distributed automation and controls systems.
2008-10-07
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is open to receive the final supplies for the STS-126 mission to the International Space Station. The 15-day flight will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station Solar Alpha Rotary Joints. Leonardo holds supplies and equipment, including equipment for the regenerative life support system, additional crew quarters and exercise equipment and spare hardware. Photo credit: NASA/Kim Shiflett
Selection of combined water electrolysis and resistojet propulsion for Space Station Freedom
NASA Technical Reports Server (NTRS)
Schmidt, George R.
1988-01-01
An analytical rationale is presented for the configuration of the NASA Space Station's two-element propulsion system, and attention is given to the cost benefits accruing to this system over the Space Station's service life. The principal system element uses gaseous oxygen and hydrogen obtained through water electrolysis to furnish attitude control, backup attitude control, and contingency maneuvering. The secondary element uses resistojets to augment Space Station reboost through the acceleration of waste gases in the direction opposite the Station's flight path.
An AI Approach to Ground Station Autonomy for Deep Space Communications
NASA Technical Reports Server (NTRS)
Fisher, Forest; Estlin, Tara; Mutz, Darren; Paal, Leslie; Law, Emily; Stockett, Mike; Golshan, Nasser; Chien, Steve
1998-01-01
This paper describes an architecture for an autonomous deep space tracking station (DS-T). The architecture targets fully automated routine operations encompassing scheduling and resource allocation, antenna and receiver predict generation. track procedure generation from service requests, and closed loop control and error recovery for the station subsystems. This architecture has been validated by the construction of a prototype DS-T station, which has performed a series of demonstrations of autonomous ground station control for downlink services with NASA's Mars Global Surveyor (MGS).
47 CFR 90.476 - Interconnection of fixed stations and certain mobile stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... mobile stations. 90.476 Section 90.476 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Interconnected Systems § 90.476 Interconnection of fixed stations and certain mobile stations. (a) Fixed stations and...
47 CFR 80.503 - Cooperative use of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... station or marine utility station on shore may install ship radio stations on board United States... verifying that the ship station licensee has the sole right of control of the ship stations, that the vessel operators must use the ship stations subject to the orders and instructions of the coast station or marine...
47 CFR 25.172 - Requirements for reporting space station control arrangements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... case of a non-U.S.-licensed space station, prior to commencing operation with U.S. earth stations. (1... earth station(s) communicating with the space station from any site in the United States. (3) The location, by city and country, of any telemetry, tracking, and command earth station that communicates with...
Systems and Methods for Collaboratively Controlling at Least One Aircraft
NASA Technical Reports Server (NTRS)
Estkowski, Regina I. (Inventor)
2016-01-01
An unmanned vehicle management system includes an unmanned aircraft system (UAS) control station controlling one or more unmanned vehicles (UV), a collaborative routing system, and a communication network connecting the UAS and the collaborative routing system. The collaborative routing system being configured to receive flight parameters from an operator of the UAS control station and, based on the received flight parameters, automatically present the UAS control station with flight plan options to enable the operator to operate the UV in a defined airspace.
Space station contamination control study: Internal combustion, phase 1
NASA Technical Reports Server (NTRS)
Ruggeri, Robert T.
1987-01-01
Contamination inside Space Station modules was studied to determine the best methods of controlling contamination. The work was conducted in five tasks that identified existing contamination control requirements, analyzed contamination levels, developed outgassing specification for materials, wrote a contamination control plan, and evaluated current materials of offgassing tests used by NASA. It is concluded that current contamination control methods can be made to function on the Space Station for up to 1000 days, but that current methods are deficient for periods longer than about 1000 days.
Fuzzy Control/Space Station automation
NASA Technical Reports Server (NTRS)
Gersh, Mark
1990-01-01
Viewgraphs on fuzzy control/space station automation are presented. Topics covered include: Space Station Freedom (SSF); SSF evolution; factors pointing to automation & robotics (A&R); astronaut office inputs concerning A&R; flight system automation and ground operations applications; transition definition program; and advanced automation software tools.
Kavandi at controls of Canadarm2 in Destiny module
2001-07-16
S104-E-5114 (16 July 2001) --- Janet L. Kavandi, STS-104 mission specialist, looks over the Canadarm2, Space Station Remote Manipulator System (SSRMS), control station in the Destiny laboratory during STS-104's visit to the International Space Station (ISS).
Flight Simulator: Use of SpaceGraph Display in an Instructor/Operator Station. Final Report.
ERIC Educational Resources Information Center
Sher, Lawrence D.
This report describes SpaceGraph, a new computer-driven display technology capable of showing space-filling images, i.e., true three dimensional displays, and discusses the advantages of this technology over flat displays for use with the instructor/operator station (IOS) of a flight simulator. Ideas resulting from 17 brainstorming sessions with…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-28
... Management Command (IMCOM) has reviewed the Final Environmental Impact Statement (FEIS) for implementing Army... Preferred Alternative for the Proposed Action. The Preferred Alternative has several components that consist... stationing of a Combat Aviation Brigade (CAB) of up to 2,800 Soldiers. If all stationing components are...
Precourt prepares for entry seated at the commander's station
1997-06-05
STS084-318-035 (15-24 May 1997) --- Attired in the partial pressure launch and entry garment, astronaut Charles J. Precourt, commander, performs final checkout procedures prior to the re-entry phase of the STS-84 mission. The photo was taken with a 35mm camera by one of the Space Shuttle Atlantis' rear station-seated crewmembers.
ERIC Educational Resources Information Center
Warner, H. D.
Human engineering guidelines for the design of instructor/operator stations (IOSs) for aircrew training devices are provided in this handbook. These guidelines specify the preferred configuration of IOS equipment across the range of the anticipated user sizes and performance capabilities. The guidelines are consolidated from various human…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... no-action alternative. The factors considered in the record of decision can be found in the final... Generating Station; Record of Decision and Issuance of Renewed Facility Operating License for an Additional... the record of decision for the renewal of facility operating license No. NPF-21, consistent with the...