Sample records for corrective action monitoring

  1. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  2. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  3. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  4. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...

  5. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...

  6. 42 CFR 460.194 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...

  7. 42 CFR 460.194 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...

  8. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  9. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  10. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  11. 7 CFR 275.3 - Federal monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... necessitate long range analytical and evaluative measures for corrective action development shall be... effective. In addition, FNS will examine the State agency's corrective action monitoring and evaluative...

  12. 7 CFR 275.3 - Federal monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... necessitate long range analytical and evaluative measures for corrective action development shall be... effective. In addition, FNS will examine the State agency's corrective action monitoring and evaluative...

  13. 7 CFR 275.3 - Federal monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... necessitate long range analytical and evaluative measures for corrective action development shall be... effective. In addition, FNS will examine the State agency's corrective action monitoring and evaluative...

  14. 7 CFR 275.3 - Federal monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... necessitate long range analytical and evaluative measures for corrective action development shall be... effective. In addition, FNS will examine the State agency's corrective action monitoring and evaluative...

  15. 7 CFR 275.3 - Federal monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... necessitate long range analytical and evaluative measures for corrective action development shall be... effective. In addition, FNS will examine the State agency's corrective action monitoring and evaluative...

  16. Error, rather than its probability, elicits specific electrocortical signatures: a combined EEG-immersive virtual reality study of action observation.

    PubMed

    Pezzetta, Rachele; Nicolardi, Valentina; Tidoni, Emmanuele; Aglioti, Salvatore Maria

    2018-06-06

    Detecting errors in one's own actions, and in the actions of others, is a crucial ability for adaptable and flexible behavior. Studies show that specific EEG signatures underpin the monitoring of observed erroneous actions (error-related negativity, error-positivity, mid-frontal theta oscillations). However, the majority of studies on action observation used sequences of trials where erroneous actions were less frequent than correct actions. Therefore, it was not possible to disentangle whether the activation of the performance monitoring system was due to an error - as a violation of the intended goal - or a surprise/novelty effect, associated with a rare and unexpected event. Combining EEG and immersive virtual reality (IVR-CAVE system), we recorded the neural signal of 25 young adults who observed in first-person perspective, simple reach-to-grasp actions performed by an avatar aiming for a glass. Importantly, the proportion of erroneous actions was higher than correct actions. Results showed that the observation of erroneous actions elicits the typical electro-cortical signatures of error monitoring and therefore the violation of the action goal is still perceived as a salient event. The observation of correct actions elicited stronger alpha suppression. This confirmed the role of the alpha frequency band in the general orienting response to novel and infrequent stimuli. Our data provides novel evidence that an observed goal error (the action slip) triggers the activity of the performance monitoring system even when erroneous actions, which are, typically, relevant events, occur more often than correct actions and thus are not salient because of their rarity.

  17. M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities groundwater monitoring and corrective-action report (U). Third and fourth quarters 1996, Vol. I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-03-01

    This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 1996.

  18. Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 112: Area 23 Hazardous Waste Trenches, Nevada Test Site, Nevada, Revision 0, December 2007; DOE/NV--1103

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for the period October 2006-September 2007. Quarterly inspections were conducted on December 20,2006; March 29,2007; June 13,2007; and September 27, 2007, to observe the condition of the gate, use restriction warning signs, monuments, fencing, trenches, soil covers, and monitoring well covers. The first inspection was conducted on December 20,2006. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. Themore » second inspection was conducted on March 29,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. Vegetation that was observed to be growing in several locations on the cover was the only identified concern, for which removal was recommended. Vegetation was removed on May 24,2007. The third inspection was conducted on June 13,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The fourth inspection was conducted on September 27,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The post-closure inspection checklists for CAU 112 are attached. Photographs and field notes taken during site inspections are maintained in the project files.« less

  19. Monitoring others' errors: The role of the motor system in early childhood and adulthood.

    PubMed

    Meyer, Marlene; Braukmann, Ricarda; Stapel, Janny C; Bekkering, Harold; Hunnius, Sabine

    2016-03-01

    Previous research demonstrates that from early in life, our cortical sensorimotor areas are activated both when performing and when observing actions (mirroring). Recent findings suggest that the adult motor system is also involved in detecting others' rule violations. Yet, how this translates to everyday action errors (e.g., accidentally dropping something) and how error-sensitive motor activity for others' actions emerges are still unknown. In this study, we examined the role of the motor system in error monitoring. Participants observed successful and unsuccessful pincer grasp actions while their electroencephalography was registered. We tested infants (8- and 14-month-olds) at different stages of learning the pincer grasp and adults as advanced graspers. Power in Alpha- and Beta-frequencies was analysed to assess motor and visual processing. Adults showed enhanced motor activity when observing erroneous actions. However, neither 8- nor 14-month-olds displayed this error sensitivity, despite showing motor activity for both actions. All groups did show similar visual activity, that is more Alpha-suppression, when observing correct actions. Thus, while correct and erroneous actions were processed as visually distinct in all age groups, only the adults' motor system was sensitive to action correctness. Functionality of different brain oscillations in the development of error monitoring and mirroring is discussed. © 2015 The British Psychological Society.

  20. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Boehlecke

    2004-04-01

    The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less

  1. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... Project Area/Management Unit Corrective Action Plan is implemented and achieves the anticipated results...

  2. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  3. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  4. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  5. 2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Correction Unit 447

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwatermore » flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.« less

  6. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less

  7. 40 CFR 257.26 - Assessment of corrective measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Assessment of corrective measures. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.26 Assessment of corrective... protection standards defined under § 257.25 (h) or (i), the owner or operator must initiate an assessment of...

  8. 40 CFR 257.26 - Assessment of corrective measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Assessment of corrective measures. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.26 Assessment of corrective... protection standards defined under § 257.25 (h) or (i), the owner or operator must initiate an assessment of...

  9. 40 CFR 257.26 - Assessment of corrective measures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Assessment of corrective measures. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.26 Assessment of corrective... protection standards defined under § 257.25 (h) or (i), the owner or operator must initiate an assessment of...

  10. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  11. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  12. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  13. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  14. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  15. 49 CFR 385.105 - Expedited action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Expedited action. 385.105 Section 385.105... Safety Monitoring System for Mexico-Domiciled Carriers § 385.105 Expedited action. (a) A Mexico-domiciled... required to submit a written response demonstrating corrective action: (1) Using drivers not possessing, or...

  16. 40 CFR 258.51 - Ground-water monitoring systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Ground-water monitoring systems. 258... CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.51 Ground-water monitoring systems. (a) A ground-water monitoring system must be installed that consists of a...

  17. 40 CFR 258.51 - Ground-water monitoring systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Ground-water monitoring systems. 258.51... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.51 Ground-water monitoring systems. (a) A ground-water monitoring system must be installed that consists of a...

  18. 40 CFR 257.22 - Ground-water monitoring systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Ground-water monitoring systems. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.22 Ground-water monitoring systems. (a) A ground-water monitoring system must be installed that consists of a sufficient number of...

  19. 40 CFR 258.51 - Ground-water monitoring systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Ground-water monitoring systems. 258... CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.51 Ground-water monitoring systems. (a) A ground-water monitoring system must be installed that consists of a...

  20. 40 CFR 257.22 - Ground-water monitoring systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Ground-water monitoring systems. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.22 Ground-water monitoring systems. (a) A ground-water monitoring system must be installed that consists of a sufficient number of...

  1. Evidence for the Automatic Evaluation of Self-Generated Actions

    ERIC Educational Resources Information Center

    Aarts, Kristien; De Houwer, Jan; Pourtois, Gilles

    2012-01-01

    The accuracy of simple actions is swiftly determined through specific monitoring brain systems. However, it remains unclear whether this evaluation is accompanied by a rapid and compatible emotional appraisal of the action that allows to mark incorrect actions as negative/bad and conversely correct actions as positive/good. In this study, we used…

  2. 40 CFR 258.56 - Assessment of corrective measures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Assessment of corrective measures. 258.56 Section 258.56 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.56...

  3. Action Monitoring Cortical Activity Coupled to Submovements

    PubMed Central

    Sobolewski, Aleksander

    2017-01-01

    Numerous studies have examined neural correlates of the human brain’s action-monitoring system during experimentally segmented tasks. However, it remains unknown how such a system operates during continuous motor output when no experimental time marker is available (such as button presses or stimulus onset). We set out to investigate the electrophysiological correlates of action monitoring when hand position has to be repeatedly monitored and corrected. For this, we recorded high-density electroencephalography (EEG) during a visuomotor tracking task during which participants had to follow a target with the mouse cursor along a visible trajectory. By decomposing hand kinematics into naturally occurring periodic submovements, we found an event-related potential (ERP) time-locked to these submovements and localized in a sensorimotor cortical network comprising the supplementary motor area (SMA) and the precentral gyrus. Critically, the amplitude of the ERP correlated with the deviation of the cursor, 110 ms before the submovement. Control analyses showed that this correlation was truly due to the cursor deviation and not to differences in submovement kinematics or to the visual content of the task. The ERP closely resembled those found in response to mismatch events in typical cognitive neuroscience experiments. Our results demonstrate the existence of a cortical process in the SMA, evaluating hand position in synchrony with submovements. These findings suggest a functional role of submovements in a sensorimotor loop of periodic monitoring and correction and generalize previous results from the field of action monitoring to cases where action has to be repeatedly monitored. PMID:29071301

  4. 40 CFR 258.51 - Ground-water monitoring systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Ground-water monitoring systems. 258.51 Section 258.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.51 Ground-water monitoring systems. (a) A...

  5. Monitoring environmental change with color slides

    Treesearch

    Arthur W. Magill

    1989-01-01

    Monitoring human impact on outdoor recreation sites and view landscapes is necessary to evaluate influences which may require corrective action and to determine if management is achieving desired goals. An inexpensive method to monitor environmental change is to establish camera points and use repeat color slides. Successful monitoring from slides requires the observer...

  6. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 110: AREA 3 WMD U-3AX/BL CRATER, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2004 - JUNE 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2005-08-01

    This Post-Closure Inspection and Monitoring report provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 Waste Management Division (WMD) U-3ax/bl Crater. This report includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2004 through June 2005. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and use restriction warning signs was good. Settling was observed thatmore » exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (cm) (6 inches [in]) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection.« less

  7. 40 CFR 257.24 - Detection monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Disposal Units Ground-Water Monitoring and Corrective Action § 257.24 Detection monitoring program. (a... unit; (ii) The mobility, stability, and persistence of waste constituents or their reaction products in... constituents, and reaction products in the ground water; and (iv) The concentration or values and coefficients...

  8. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0 with ROTC 1, 2, and Errata

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wickline, Alfred

    2004-04-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 204 Storage Bunkers, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE); and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) north of Las Vegas, Nevada (Figure 1-1). The Corrective Action Sites (CASs) within CAU 204 are located in Areas 1, 2, 3, and 5 of the NTS, in Nye County, Nevada (Figure 1-2). Corrective Action Unit 204 ismore » comprised of the six CASs identified in Table 1-1. As shown in Table 1-1, the FFACO describes four of these CASs as bunkers one as chemical exchange storage and one as a blockhouse. Subsequent investigations have identified four of these structures as instrumentation bunkers (CASs 01-34-01, 02-34-01, 03-34-01, 05-33-01), one as an explosives storage bunker (CAS 05-99-02), and one as both (CAS 05-18-02). The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activities conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation.« less

  9. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  10. 40 CFR 258.55 - Assessment monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 258.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.55 Assessment... be shown that the removed constituents are not reasonably expected to be in or derived from the waste...

  11. 40 CFR 258.54 - Detection monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.54 Detection... reaction products in the unsaturated zone beneath the MSWLF unit; (iii) The detectability of indicator parameters, waste constituents, and reaction products in the ground water; and (iv) The concentration or...

  12. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... charging, and shutdown procedures. (iv) Combustion controls and monitoring. (v) Operation of air pollution... the incinerator and air pollution control devices. (vii) Actions to correct malfunctions or conditions... requirements. (xiii) Methods to continuously monitor CISWI unit and air pollution control device operating...

  13. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... charging, and shutdown procedures. (iv) Combustion controls and monitoring. (v) Operation of air pollution... the incinerator and air pollution control devices. (vii) Actions to correct malfunctions or conditions... requirements. (xiii) Methods to continuously monitor CISWI unit and air pollution control device operating...

  14. Reality Monitoring and Feedback Control of Speech Production Are Related Through Self-Agency.

    PubMed

    Subramaniam, Karuna; Kothare, Hardik; Mizuiri, Danielle; Nagarajan, Srikantan S; Houde, John F

    2018-01-01

    Self-agency is the experience of being the agent of one's own thoughts and motor actions. The intact experience of self-agency is necessary for successful interactions with the outside world (i.e., reality monitoring) and for responding to sensory feedback of our motor actions (e.g., speech feedback control). Reality monitoring is the ability to distinguish internally self-generated information from outside reality (externally-derived information). In the present study, we examined the relationship of self-agency between lower-level speech feedback monitoring (i.e., monitoring what we hear ourselves say) and a higher-level cognitive reality monitoring task. In particular, we examined whether speech feedback monitoring and reality monitoring were driven by the capacity to experience self-agency-the ability to make reliable predictions about the outcomes of self-generated actions. During the reality monitoring task, subjects made judgments as to whether information was previously self-generated (self-agency judgments) or externally derived (external-agency judgments). During speech feedback monitoring, we assessed self-agency by altering environmental auditory feedback so that subjects listened to a perturbed version of their own speech. When subjects heard minimal perturbations in their auditory feedback while speaking, they made corrective responses, indicating that they judged the perturbations as errors in their speech output. We found that self-agency judgments in the reality-monitoring task were higher in people who had smaller corrective responses ( p = 0.05) and smaller inter-trial variability ( p = 0.03) during minimal pitch perturbations of their auditory feedback. These results provide support for a unitary process for the experience of self-agency governing low-level speech control and higher level reality monitoring.

  15. GUIDELINES FOR INSTALLATION AND SAMPLING OF SUB-SLAB VAPOR PROBES TO SUPPORT ASSESSMENT OF VAPOR INTRUSION

    EPA Science Inventory

    The purpose of this paper is to provide guidelines for sub-slab sampling using dedicated vapor probes. Use of dedicated vapor probes allows for multiple sample events before and after corrective action and for vacuum testing to enhance the design and monitoring of a corrective m...

  16. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  17. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  18. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  19. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  20. 40 CFR 258.54 - Detection monitoring program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.54 Detection... indicator parameters for a MSWLF unit, in lieu of some or all of the heavy metals (constituents 1-15 in... parameters, waste constituents, and reaction products in the ground water; and (iv) The concentration or...

  1. 40 CFR 258.54 - Detection monitoring program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.54 Detection... indicator parameters for a MSWLF unit, in lieu of some or all of the heavy metals (constituents 1-15 in... parameters, waste constituents, and reaction products in the ground water; and (iv) The concentration or...

  2. 40 CFR 258.54 - Detection monitoring program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.54 Detection... indicator parameters for a MSWLF unit, in lieu of some or all of the heavy metals (constituents 1-15 in... parameters, waste constituents, and reaction products in the ground water; and (iv) The concentration or...

  3. 40 CFR 258.54 - Detection monitoring program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.54 Detection... indicator parameters for a MSWLF unit, in lieu of some or all of the heavy metals (constituents 1-15 in... parameters, waste constituents, and reaction products in the ground water; and (iv) The concentration or...

  4. Method, system and apparatus for monitoring and adjusting the quality of indoor air

    DOEpatents

    Hartenstein, Steven D.; Tremblay, Paul L.; Fryer, Michael O.; Hohorst, Frederick A.

    2004-03-23

    A system, method and apparatus is provided for monitoring and adjusting the quality of indoor air. A sensor array senses an air sample from the indoor air and analyzes the air sample to obtain signatures representative of contaminants in the air sample. When the level or type of contaminant poses a threat or hazard to the occupants, the present invention takes corrective actions which may include introducing additional fresh air. The corrective actions taken are intended to promote overall health of personnel, prevent personnel from being overexposed to hazardous contaminants and minimize the cost of operating the HVAC system. The identification of the contaminants is performed by comparing the signatures provided by the sensor array with a database of known signatures. Upon identification, the system takes corrective actions based on the level of contaminant present. The present invention is capable of learning the identity of previously unknown contaminants, which increases its ability to identify contaminants in the future. Indoor air quality is assured by monitoring the contaminants not only in the indoor air, but also in the outdoor air and the air which is to be recirculated. The present invention is easily adaptable to new and existing HVAC systems. In sum, the present invention is able to monitor and adjust the quality of indoor air in real time by sensing the level and type of contaminants present in indoor air, outdoor and recirculated air, providing an intelligent decision about the quality of the air, and minimizing the cost of operating an HVAC system.

  5. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  6. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  7. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  8. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  9. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  10. 40 CFR 146.84 - Area of review and corrective action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activity. The area of review is delineated using computational modeling that accounts for the physical and... characterization, monitoring and operational data, and computational modeling, the projected lateral and vertical...

  11. 40 CFR 146.84 - Area of review and corrective action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activity. The area of review is delineated using computational modeling that accounts for the physical and... characterization, monitoring and operational data, and computational modeling, the projected lateral and vertical...

  12. 40 CFR 146.84 - Area of review and corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activity. The area of review is delineated using computational modeling that accounts for the physical and... characterization, monitoring and operational data, and computational modeling, the projected lateral and vertical...

  13. 40 CFR 146.84 - Area of review and corrective action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activity. The area of review is delineated using computational modeling that accounts for the physical and... characterization, monitoring and operational data, and computational modeling, the projected lateral and vertical...

  14. Operational support for Upper Atmosphere Research Satellite (UARS) attitude sensors

    NASA Technical Reports Server (NTRS)

    Lee, M.; Garber, A.; Lambertson, M.; Raina, P.; Underwood, S.; Woodruff, C.

    1994-01-01

    The Upper Atmosphere Research Satellite (UARS) has several sensors that can provide observations for attitude determination: star trackers, Sun sensors (gimbaled as well as fixed), magnetometers, Earth sensors, and gyroscopes. The accuracy of these observations is important for mission success. Analysts on the Flight Dynamics Facility (FDF) UARS Attitude task monitor these data to evaluate the performance of the sensors taking corrective action when appropriate. Monitoring activities range from examining the data during real-time passes to constructing long-term trend plots. Increasing residuals (differences) between the observed and expected quantities is a prime indicator of sensor problems. Residual increases may be due to alignment shifts and/or degradation in sensor output. Residuals from star tracker data revealed and anomalous behavior that contributes to attitude errors. Compensating for this behavior has significantly reduced the attitude errors. This paper discusses the methods used by the FDF UARS attitude task for maintenance of the attitude sensors, including short- and long-term monitoring, trend analysis, and calibration methods, and presents the results obtained through corrective action.

  15. 40 CFR 60.2635 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Combustion controls and monitoring. (v) Operation of air pollution control equipment and factors affecting... devices. (vii) Actions to correct malfunctions or conditions that may lead to malfunction. (viii) Bottom...

  16. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  17. Fact Sheet: Water Monitoring Reveals More Well Contamination

    EPA Pesticide Factsheets

    Wedron Resource Conservation and Recovery Act (RCRA) Corrective Action program to work with hazardous waste facilities to investigate and clean up any release of hazardous waste into the soil, ground water, surface water and air.

  18. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  19. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  20. Intelligent monitoring and control of semiconductor manufacturing equipment

    NASA Technical Reports Server (NTRS)

    Murdock, Janet L.; Hayes-Roth, Barbara

    1991-01-01

    The use of AI methods to monitor and control semiconductor fabrication in a state-of-the-art manufacturing environment called the Rapid Thermal Multiprocessor is described. Semiconductor fabrication involves many complex processing steps with limited opportunities to measure process and product properties. By applying additional process and product knowledge to that limited data, AI methods augment classical control methods by detecting abnormalities and trends, predicting failures, diagnosing, planning corrective action sequences, explaining diagnoses or predictions, and reacting to anomalous conditions that classical control systems typically would not correct. Research methodology and issues are discussed, and two diagnosis scenarios are examined.

  1. 40 CFR 264.602 - Monitoring, analysis, inspection, response, reporting, and corrective action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE....75, 264.76, 264.77, and -264.101 as well as meet any additional requirements needed to protect human...

  2. 40 CFR 264.602 - Monitoring, analysis, inspection, response, reporting, and corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE....75, 264.76, 264.77, and -264.101 as well as meet any additional requirements needed to protect human...

  3. 40 CFR 264.602 - Monitoring, analysis, inspection, response, reporting, and corrective action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE....75, 264.76, 264.77, and -264.101 as well as meet any additional requirements needed to protect human...

  4. 40 CFR 264.602 - Monitoring, analysis, inspection, response, reporting, and corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE....75, 264.76, 264.77, and -264.101 as well as meet any additional requirements needed to protect human...

  5. 40 CFR 264.602 - Monitoring, analysis, inspection, response, reporting, and corrective action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE....75, 264.76, 264.77, and -264.101 as well as meet any additional requirements needed to protect human...

  6. Validation, Proof-of-Concept, and Postaudit of the Groundwater Flow and Transport Model of the Project Shoal Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahmed Hassan

    2004-09-01

    The groundwater flow and radionuclide transport model characterizing the Shoal underground nuclear test has been accepted by the State of Nevada Division of Environmental Protection. According to the Federal Facility Agreement and Consent Order (FFACO) between DOE and the State of Nevada, the next steps in the closure process for the site are then model validation (or postaudit), the proof-of-concept, and the long-term monitoring stage. This report addresses the development of the validation strategy for the Shoal model, needed for preparing the subsurface Corrective Action Decision Document-Corrective Action Plan and the development of the proof-of-concept tools needed during the five-yearmore » monitoring/validation period. The approach builds on a previous model, but is adapted and modified to the site-specific conditions and challenges of the Shoal site.« less

  7. 40 CFR 63.8244 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... temperature specified in § 63.8232(f)(1)(vii) during each heating phase of the regeneration cycle of your... determined according to § 63.8232(f)(2) for three consecutive regeneration cycles, your monitoring value is out of range and you must take corrective action as soon as practicable. During the first regeneration...

  8. 40 CFR 63.8244 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... temperature specified in § 63.8232(f)(1)(vii) during each heating phase of the regeneration cycle of your... determined according to § 63.8232(f)(2) for three consecutive regeneration cycles, your monitoring value is out of range and you must take corrective action as soon as practicable. During the first regeneration...

  9. 40 CFR 63.8244 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... temperature specified in § 63.8232(f)(1)(vii) during each heating phase of the regeneration cycle of your... determined according to § 63.8232(f)(2) for three consecutive regeneration cycles, your monitoring value is out of range and you must take corrective action as soon as practicable. During the first regeneration...

  10. 40 CFR 63.8244 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... temperature specified in § 63.8232(f)(1)(vii) during each heating phase of the regeneration cycle of your... determined according to § 63.8232(f)(2) for three consecutive regeneration cycles, your monitoring value is out of range and you must take corrective action as soon as practicable. During the first regeneration...

  11. Evaluative priming reveals dissociable effects of cognitive versus physiological anxiety on action monitoring.

    PubMed

    De Saedeleer, Lien; Pourtois, Gilles

    2016-06-01

    Performance monitoring enables the rapid detection of mismatches between goals or intentions and actions, as well as subsequent behavioral adjustment by means of enhanced attention control. These processes are not encapsulated, but they are readily influenced by affective or motivational variables, including negative affect. Here we tested the prediction that worry, the cognitive component of anxiety, and arousal, its physiological counterpart, can each influence specific processes during performance monitoring. In 2 experiments, participants were asked to discriminate the valence of emotional words that were preceded by either correct (good) or incorrect (bad) actions, serving as primes in a standard evaluative priming procedure. In Experiment 1 (n = 36) we examined the influence of trait worry and arousal. Additionally, we included a face priming task to examine the specificity of this effect. Stepwise linear regression analyses showed that increased worry, but not arousal, weakened the evaluative priming effect and therefore the rapid and automatic processing of actions as good or bad. By contrast, arousal, but not worry, increased posterror slowing. In Experiment 2 (n = 30) state worry was induced using an anagram task. Effects of worry on action monitoring were trait but not state dependent, and only evidenced when actions were directly used as primes. These results suggest a double dissociation between worry and arousal during performance monitoring. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  12. Labor Costs in DoD Contracts.

    DTIC Science & Technology

    1985-08-01

    Labor Costs in 000 Contracts HQ DA, ATTN: DACA -BUZ-X (Mr. Walker) HQ DA, ATTN: DACA -OM1Z-B (Mr. Olson) HQ DA, ATTN: DACS-DPZ-B (Dr. Bellaschi) Defense...counterparts and if so, recommend corrective action . C. APPROACH. In addition to reviewing current methods used to monitor and control labor costs, a...Compensation Related Actions .................................... 27 6. Compensation Data Information Flow .................................. 32 V

  13. 40 CFR 258.59 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false [Reserved] 258.59 Section 258.59 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.59 [Reserved] ...

  14. Environment/Health/Safety (EHS): Databases

    Science.gov Websites

    Hazard Documents Database Biosafety Authorization System CATS (Corrective Action Tracking System) (for findings 12/2005 to present) Chemical Management System Electrical Safety Ergonomics Database (for new Learned / Best Practices REMS - Radiation Exposure Monitoring System SJHA Database - Subcontractor Job

  15. 40 CFR 258.52 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false [Reserved] 258.52 Section 258.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.52 [Reserved] ...

  16. 40 CFR 258.59 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false [Reserved] 258.59 Section 258.59 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.59 [Reserved] ...

  17. 40 CFR 258.52 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false [Reserved] 258.52 Section 258.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.52 [Reserved] ...

  18. Emerging Trends in Regulatory Implementation of MNA

    EPA Science Inventory

    There are two EPA documents relevant to MNA of Chlorinated Solvents: the Technical Protocol for Evaluating Natural Attenuation of Chlorinated Solvents in Ground Water. EPA/600/R-98/128 September, 1998, and Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action...

  19. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Alvarado, Juan

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less

  20. Brain negativity as an indicator of predictive error processing: the contribution of visual action effect monitoring.

    PubMed

    Joch, Michael; Hegele, Mathias; Maurer, Heiko; Müller, Hermann; Maurer, Lisa Katharina

    2017-07-01

    The error (related) negativity (Ne/ERN) is an event-related potential in the electroencephalogram (EEG) correlating with error processing. Its conditions of appearance before terminal external error information suggest that the Ne/ERN is indicative of predictive processes in the evaluation of errors. The aim of the present study was to specifically examine the Ne/ERN in a complex motor task and to particularly rule out other explaining sources of the Ne/ERN aside from error prediction processes. To this end, we focused on the dependency of the Ne/ERN on visual monitoring about the action outcome after movement termination but before result feedback (action effect monitoring). Participants performed a semi-virtual throwing task by using a manipulandum to throw a virtual ball displayed on a computer screen to hit a target object. Visual feedback about the ball flying to the target was masked to prevent action effect monitoring. Participants received a static feedback about the action outcome (850 ms) after each trial. We found a significant negative deflection in the average EEG curves of the error trials peaking at ~250 ms after ball release, i.e., before error feedback. Furthermore, this Ne/ERN signal did not depend on visual ball-flight monitoring after release. We conclude that the Ne/ERN has the potential to indicate error prediction in motor tasks and that it exists even in the absence of action effect monitoring. NEW & NOTEWORTHY In this study, we are separating different kinds of possible contributors to an electroencephalogram (EEG) error correlate (Ne/ERN) in a throwing task. We tested the influence of action effect monitoring on the Ne/ERN amplitude in the EEG. We used a task that allows us to restrict movement correction and action effect monitoring and to control the onset of result feedback. We ascribe the Ne/ERN to predictive error processing where a conscious feeling of failure is not a prerequisite. Copyright © 2017 the American Physiological Society.

  1. Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluatedmore » to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).« less

  2. 40 CFR 63.1517 - Records

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operating parameter value and corrective action taken. (6) For each continuous monitoring system, records... operator may retain records on microfilm, computer disks, magnetic tape, or microfiche; and (3) The owner or operator may report required information on paper or on a labeled computer disk using commonly...

  3. 40 CFR 257.13 - Deadline for making demonstrations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Hazardous Waste Disposal Units Location Restrictions § 257.13 Deadline for making demonstrations. Existing..., 1998, must not accept CESQG hazardous waste for disposal. Ground-Water Monitoring and Corrective Action ... WASTES CRITERIA FOR CLASSIFICATION OF SOLID WASTE DISPOSAL FACILITIES AND PRACTICES Disposal Standards...

  4. Corrective Action Investigation Plan for Corrective Action Unit 168: Areas 25 and 26 Contaminated Materials and Waste Dumps, Nevada Test Site, Nevada (Rev. 0) includes Record of Technical Change No. 1 (dated 8/28/2002), Record of Technical Change No. 2 (dated 9/23/2002), and Record of Technical Change No. 3 (dated 6/2/2004)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit 168 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 168 consists of a group of twelve relatively diverse Corrective Action Sites (CASs 25-16-01, Construction Waste Pile; 25-16-03, MX Construction Landfill; 25-19-02, Waste Disposal Site; 25-23-02, Radioactive Storage RR Cars; 25-23-18, Radioactive Material Storage; 25-34-01, NRDS Contaminated Bunker; 25-34-02, NRDS Contaminated Bunker; CAS 25-23-13, ETL - Lab Radioactive Contamination; 25-99-16, USW G3;more » 26-08-01, Waste Dump/Burn Pit; 26-17-01, Pluto Waste Holding Area; 26-19-02, Contaminated Waste Dump No.2). These CASs vary in terms of the sources and nature of potential contamination. The CASs are located and/or associated wit h the following Nevada Test Site (NTS) facilities within three areas. The first eight CASs were in operation between 1958 to 1984 in Area 25 include the Engine Maintenance, Assembly, and Disassembly Facility; the Missile Experiment Salvage Yard; the Reactor Maintenance, Assembly, and Disassembly Facility; the Radioactive Materials Storage Facility; and the Treatment Test Facility Building at Test Cell A. Secondly, the three CASs located in Area 26 include the Project Pluto testing area that operated from 1961 to 1964. Lastly, the Underground Southern Nevada Well (USW) G3 (CAS 25-99-16), a groundwater monitoring well located west of the NTS on the ridgeline of Yucca Mountain, was in operation during the 1980s. Based on site history and existing characterization data obtained to support the data quality objectives process, contaminants of potential concern (COPCs) for CAU 168 are primarily radionuclide; however, the COPCs for several CASs were not defined. To address COPC uncertainty, the analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. Upon reviewing historical data and current site conditions, it has been determined that no further characterization is required at USW G3 (CAS 25-99-16) to select the appropriate corrective action. A cesium-137 source was encased in cement within the vadous zone during the drilling of the well (CAS 25-99-16). A corrective action of closure in place with a land-use restriction for drilling near USW G3 is appropriate. This corrective action will be documented in the Corrective Action Decision Document (CADD) for CAU 168. The results of the remaining field investigation will support a defensible evaluation of corrective action alternatives for the other CASs within CAU 168 in this CADD.« less

  5. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less

  6. 40 CFR 63.548 - Monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bag leak detection and corrective action plans for all baghouses (fabric filters) that are used to... the baghouse through visual inspection of the baghouse interior for air leaks. (8) Quarterly... operation of a bag leak detection system. (d) The procedures specified in the standard operating procedures...

  7. Subthreshold muscle twitches dissociate oscillatory neural signatures of conflicts from errors.

    PubMed

    Cohen, Michael X; van Gaal, Simon

    2014-02-01

    We investigated the neural systems underlying conflict detection and error monitoring during rapid online error correction/monitoring mechanisms. We combined data from four separate cognitive tasks and 64 subjects in which EEG and EMG (muscle activity from the thumb used to respond) were recorded. In typical neuroscience experiments, behavioral responses are classified as "error" or "correct"; however, closer inspection of our data revealed that correct responses were often accompanied by "partial errors" - a muscle twitch of the incorrect hand ("mixed correct trials," ~13% of the trials). We found that these muscle twitches dissociated conflicts from errors in time-frequency domain analyses of EEG data. In particular, both mixed-correct trials and full error trials were associated with enhanced theta-band power (4-9Hz) compared to correct trials. However, full errors were additionally associated with power and frontal-parietal synchrony in the delta band. Single-trial robust multiple regression analyses revealed a significant modulation of theta power as a function of partial error correction time, thus linking trial-to-trial fluctuations in power to conflict. Furthermore, single-trial correlation analyses revealed a qualitative dissociation between conflict and error processing, such that mixed correct trials were associated with positive theta-RT correlations whereas full error trials were associated with negative delta-RT correlations. These findings shed new light on the local and global network mechanisms of conflict monitoring and error detection, and their relationship to online action adjustment. © 2013.

  8. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  9. Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less

  10. Final corrective action study for the former CCC/USDA facility in Ramona, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    Past operations at a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Ramona, Kansas, resulted in low concentrations of carbon tetrachloride in groundwater that slightly exceed the regulatory standard in only one location. As requested by the Kansas Department of Health and Environment, the CCC/USDA has prepared a Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address groundwater impacted by the former CCC/USDA facility but not releases caused by other potential groundwater contamination sources in Ramona. Four remedial alternatives were considered in themore » CAS. The recommended remedial alternative in the CAS consists of Environmental Use Control to prevent the inadvertent use of groundwater as a water supply source, coupled with groundwater monitoring to verify the continued natural improvement in groundwater quality. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) has directed Argonne National Laboratory to prepare a Corrective Action Study (CAS), consistent with guidance from the Kansas Department of Health and Environment (KDHE 2001a), for the CCC/USDA grain storage facility formerly located in Ramona, Kansas. This effort is pursuant to a KDHE (2007a) request. Although carbon tetrachloride levels at the Ramona site are low, they remain above the Kansas Tier 2 risk-based screening level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5 {micro}g/L (Kansas 2003, 2004). In its request for the CAS, the KDHE (2007a) stated that, because of these levels, risk is associated with potential future exposure to contaminated groundwater. The KDHE therefore determined that additional measures are warranted to limit future use of the property and/or exposure to contaminated media as part of site closure. The KDHE further requested comparison of at least two corrective action alternatives to the 'no-action' alternative, as the basis for the Draft Corrective Action Decision for the site. The history and nature of the contamination and previous investigations are summarized in Section 2. Also included in Section 2 is an evaluation of human and environmental targets and potential exposure pathways. Section 3 describes the corrective action goals and applicable or relevant and appropriate requirements (ARARs). Section 4 describes four alternatives, Section 5 analyzes the alternatives in detail, and Section 6 compares the alternatives. Section 6 also includes a summary and a recommended corrective action.« less

  11. Building Automation Systems.

    ERIC Educational Resources Information Center

    Honeywell, Inc., Minneapolis, Minn.

    A number of different automation systems for use in monitoring and controlling building equipment are described in this brochure. The system functions include--(1) collection of information, (2) processing and display of data at a central panel, and (3) taking corrective action by sounding alarms, making adjustments, or automatically starting and…

  12. In-Vehicle Safety Advisory And Warning System (Ivsaws), Volume Iv, Appendices I Through K

    DOT National Transportation Integrated Search

    2001-01-01

    The importance of timely corrective action for rutted pavements, coupled with the need for safe and efficient data collection, has led many state highway agencies to use automated survey vehicles to collect the data needed to assess and monitor the e...

  13. 40 CFR 264.551 - Grandfathered Corrective Action Management Units (CAMUs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... risks to humans or to the environment resulting from exposure to hazardous wastes or hazardous... human health and the environment, to include, for areas where wastes will remain in place, monitoring... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...

  14. 40 CFR 264.551 - Grandfathered Corrective Action Management Units (CAMUs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... risks to humans or to the environment resulting from exposure to hazardous wastes or hazardous... human health and the environment, to include, for areas where wastes will remain in place, monitoring... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...

  15. Report: Congressionally Requested Report on Office of Inspector General Unimplemented Recommendations (Revised)

    EPA Pesticide Factsheets

    Report #08-P-0123, March 31, 2008. Both program offices and the Office of the Chief Financial Officer, in its oversight role, can do more to monitor the audit followup process and ensure that timely and appropriate corrective actions are taking place.

  16. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  17. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  18. The SERENITY Runtime Monitoring Framework

    NASA Astrophysics Data System (ADS)

    Spanoudakis, George; Kloukinas, Christos; Mahbub, Khaled

    This chapter describes SERENITY’s approach to runtime monitoring and the framework that has been developed to support it. Runtime monitoring is required in SERENITY in order to check for violations of security and dependability properties which are necessary for the correct operation of the security and dependability solutions that are available from the SERENITY framework. This chapter discusses how such properties are specified and monitored. The chapter focuses on the activation and execution of monitoring activities using S&D Patterns and the actions that may be undertaken following the detection of property violations. The approach is demonstrated in reference to one of the industrial case studies of the SERENITY project.

  19. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  20. 24 CFR 1000.530 - What corrective and remedial actions will HUD request or recommend to address performance...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring... for completing activities or complying with the requirements of this part; (3) Recommend that the recipient suspend, discontinue, or not incur costs for the affected activity; (4) Recommend that the...

  1. 24 CFR 1000.530 - What corrective and remedial actions will HUD request or recommend to address performance...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring... for completing activities or complying with the requirements of this part; (3) Recommend that the recipient suspend, discontinue, or not incur costs for the affected activity; (4) Recommend that the...

  2. 24 CFR 1000.530 - What corrective and remedial actions will HUD request or recommend to address performance...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability... is repeated; (2) Request the recipient to submit progress schedules for completing activities or... incur costs for the affected activity; (4) Recommend that the recipient redirect funds from affected...

  3. 24 CFR 1000.530 - What corrective and remedial actions will HUD request or recommend to address performance...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability... is repeated; (2) Request the recipient to submit progress schedules for completing activities or... incur costs for the affected activity; (4) Recommend that the recipient redirect funds from affected...

  4. 24 CFR 1000.530 - What corrective and remedial actions will HUD request or recommend to address performance...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring... for completing activities or complying with the requirements of this part; (3) Recommend that the recipient suspend, discontinue, or not incur costs for the affected activity; (4) Recommend that the...

  5. 49 CFR 24.4 - Assurances, monitoring and corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 24.4 Transportation Office of the Secretary of Transportation UNIFORM RELOCATION ASSISTANCE AND... Uniform Act, the State Agency must provide appropriate assurances that it will comply with the Uniform Act and this part. A displacing Agency's assurances shall be in accordance with section 210 of the Uniform...

  6. REAGENTLESS FIELD-USABLE FIXED-SITE AND PORTABLE ANALYZER FOR TRIHALOMETHANE (THM) CONCENTRATIONS IN DRINKING WATER - PHASE I

    EPA Science Inventory

    Environmental Protection Agency rules stipulate that corrective action be taken for drinking water distribution systems that exceed the maximum contaminant level (MCL) for total Trihalomethanes (TTHMs) 80μg/L.  Real-time, or even periodic, monitoring of drinking water i...

  7. 40 CFR 63.11440 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... exceeds 1540 °C (2800 °F), you must take corrective action according to your standard operating procedures... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  8. 40 CFR 63.11440 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... exceeds 1540 °C (2800 °F), you must take corrective action according to your standard operating procedures... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  9. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  10. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  11. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  12. FORTRAN Automated Code Evaluation System (faces) system documentation, version 2, mod 0. [error detection codes/user manuals (computer programs)

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A system is presented which processes FORTRAN based software systems to surface potential problems before they become execution malfunctions. The system complements the diagnostic capabilities of compilers, loaders, and execution monitors rather than duplicating these functions. Also, it emphasizes frequent sources of FORTRAN problems which require inordinate manual effort to identify. The principle value of the system is extracting small sections of unusual code from the bulk of normal sequences. Code structures likely to cause immediate or future problems are brought to the user's attention. These messages stimulate timely corrective action of solid errors and promote identification of 'tricky' code. Corrective action may require recoding or simply extending software documentation to explain the unusual technique.

  13. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flatmore » CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).« less

  14. Electronic System for Preventing Airport Runway Incursions

    NASA Technical Reports Server (NTRS)

    Dabney, Richard; Elrod, Susan

    2009-01-01

    A proposed system of portable illuminated signs, electronic monitoring equipment, and radio-communication equipment for preventing (or taking corrective action in response to) improper entry of aircraft, pedestrians, or ground vehicles onto active airport runways is described. The main overall functions of the proposed system would be to automatically monitor aircraft ground traffic on or approaching runways and to generate visible and/or audible warnings to affected pilots, ground-vehicle drivers, and control-tower personnel when runway incursions take place.

  15. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  16. 40 CFR 75.59 - Certification, quality assurance, and quality control record provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and the run average); (B) The raw data and results for all required pre-test, post-test, pre-run and...-day calibration error tests, all daily system integrity checks (Hg monitors, only), and all off-line calibration demonstrations, including any follow-up tests after corrective action: (i) Component-system...

  17. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  18. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  19. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  20. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  1. 40 CFR 60.674 - Monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... certified by the manufacturer to be accurate within ±250 pascals ±1 inch water gauge pressure and must be... monthly periodic inspections to check that water is flowing to discharge spray nozzles in the wet... corrective action as expediently as practical if the owner or operator finds that water is not flowing...

  2. 40 CFR 258.53 - Ground-water sampling and analysis requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Ground-water sampling and analysis requirements. 258.53 Section 258.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.53 Ground-water sampling and analysi...

  3. 40 CFR 258.53 - Ground-water sampling and analysis requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Ground-water sampling and analysis requirements. 258.53 Section 258.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.53 Ground-water sampling and analysi...

  4. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  5. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  6. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  7. Integration of a computerized two-finger gripper for robot workstation safety

    NASA Technical Reports Server (NTRS)

    Sneckenberger, John E.; Yoshikata, Kazuki

    1988-01-01

    A microprocessor-based controller has been developed that continuously monitors and adjusts the gripping force applied by a special two-finger gripper. This computerized force sensing gripper system enables the endeffector gripping action to be independently detected and corrected. The gripping force applied to a manipulated object is real-time monitored for problem situations, situations which can occur during both planned and errant robot arm manipulation. When unspecified force conditions occur at the gripper, the gripping force controller initiates specific reactions to cause dynamic corrections to the continuously variable gripping action. The force controller for this intelligent gripper has been interfaced to the controller of an industrial robot. The gripper and robot controllers communicate to accomplish the successful completion of normal gripper operations as well as unexpected hazardous situations. An example of an unexpected gripping condition would be the sudden deformation of the object being manipulated by the robot. The capabilities of the interfaced gripper-robot system to apply workstation safety measures (e.g., stop the robot) when these unexpected gripping effects occur have been assessed.

  8. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & Building 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  9. Zoonoses action plan Salmonella monitoring programme: an investigation of the sampling protocol.

    PubMed

    Snary, E L; Munday, D K; Arnold, M E; Cook, A J C

    2010-03-01

    The Zoonoses Action Plan (ZAP) Salmonella Programme was established by the British Pig Executive to monitor Salmonella prevalence in quality-assured British pigs at slaughter by testing a sample of pigs with a meat juice enzyme-linked immunosorbent assay for antibodies against group B and C(1) Salmonella. Farms were assigned a ZAP level (1 to 3) depending on the monitored prevalence, and ZAP 2 or 3 farms were required to act to reduce the prevalence. The ultimate goal was to reduce the risk of human salmonellosis attributable to British pork. A mathematical model has been developed to describe the ZAP sampling protocol. Results show that the probability of assigning a farm the correct ZAP level was high, except for farms that had a seroprevalence close to the cutoff points between different ZAP levels. Sensitivity analyses identified that the probability of assigning a farm to the correct ZAP level was dependent on the sensitivity and specificity of the test, the number of batches taken to slaughter each quarter, and the number of samples taken per batch. The variability of the predicted seroprevalence was reduced as the number of batches or samples increased and, away from the cutoff points, the probability of being assigned the correct ZAP level increased as the number of batches or samples increased. In summary, the model described here provided invaluable insight into the ZAP sampling protocol. Further work is required to understand the impact of the program for Salmonella infection in British pig farms and therefore on human health.

  10. CORRRECTIVE ACTION DECISION DOCUMENT FOR CORRECTIVE ACTION UNIT 427: AREA 3 SEPTIC WASTE SYSTEMS 2 AND 6, TONOPAH TEST RANGE, NEVADA, REVISION 0, JUNE 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ITLV.

    1998-06-01

    This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less

  11. 40 CFR 63.7834 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...

  12. 40 CFR 63.7834 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...

  13. 40 CFR 63.7834 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...

  14. 40 CFR 63.7834 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...

  15. 40 CFR 63.7834 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...

  16. Superfund Record of Decision (EPA Region 4): Ciba-Geigy, Washington County, Mcintosh, AL. (Second remedial action), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-30

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. From 1952 to present, Ciba-Geigy, formerly Geigy Chemical Corporation, has produced various chemicals including DDT, laundry products, herbicides, insecticides, agricultural chelating agents, sequestering agents, plastic resins and additives, antioxidants, and specialty chemicals. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. In 1987, as part of the corrective action plan requirements, Ciba-Geigy installed an additional wastewater treatment system and ground water monitoring wells.more » The ROD addresses highly contaminated soil and sludge at 10 of the 11 former waste management areas as OU2. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs including benzene and toluene; other organics including PCBs and pesticides (e.g., DDT); and metals including lead. The selected remedial action for the site is included.« less

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  18. Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less

  19. Corrective Action Investigation Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, with Errata Sheet, Revision 0 (in English; Afrikaans)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  20. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  1. Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  2. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less

  3. The neural basis of monitoring goal progress

    PubMed Central

    Benn, Yael; Webb, Thomas L.; Chang, Betty P. I.; Sun, Yu-Hsuan; Wilkinson, Iain D.; Farrow, Tom F. D.

    2014-01-01

    The neural basis of progress monitoring has received relatively little attention compared to other sub-processes that are involved in goal directed behavior such as motor control and response inhibition. Studies of error-monitoring have identified the dorsal anterior cingulate cortex (dACC) as a structure that is sensitive to conflict detection, and triggers corrective action. However, monitoring goal progress involves monitoring correct as well as erroneous events over a period of time. In the present research, 20 healthy participants underwent functional magnetic resonance imagining (fMRI) while playing a game that involved monitoring progress toward either a numerical or a visuo-spatial target. The findings confirmed the role of the dACC in detecting situations in which the current state may conflict with the desired state, but also revealed activations in the frontal and parietal regions, pointing to the involvement of processes such as attention and working memory (WM) in monitoring progress over time. In addition, activation of the cuneus was associated with monitoring progress toward a specific target presented in the visual modality. This is the first time that activation in this region has been linked to higher-order processing of goal-relevant information, rather than low-level anticipation of visual stimuli. Taken together, these findings identify the neural substrates involved in monitoring progress over time, and how these extend beyond activations observed in conflict and error monitoring. PMID:25309380

  4. SU-F-T-67: Correction Factors for Monitor Unit Verification of Clinical Electron Beams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haywood, J

    Purpose: Monitor units calculated by electron Monte Carlo treatment planning systems are often higher than TG-71 hand calculations for a majority of patients. Here I’ve calculated tables of geometry and heterogeneity correction factors for correcting electron hand calculations. Method: A flat water phantom with spherical volumes having radii ranging from 3 to 15 cm was created. The spheres were centered with respect to the flat water phantom, and all shapes shared a surface at 100 cm SSD. D{sub max} dose at 100 cm SSD was calculated for each cone and energy on the flat phantom and for the spherical volumesmore » in the absence of the flat phantom. The ratio of dose in the sphere to dose in the flat phantom defined the geometrical correction factor. The heterogeneity factors were then calculated from the unrestricted collisional stopping power for tissues encountered in electron beam treatments. These factors were then used in patient second check calculations. Patient curvature was estimated by the largest sphere that aligns to the patient contour, and appropriate tissue density was read from the physical properties provided by the CT. The resulting MU were compared to those calculated by the treatment planning system and TG-71 hand calculations. Results: The geometry and heterogeneity correction factors range from ∼(0.8–1.0) and ∼(0.9–1.01) respectively for the energies and cones presented. Percent differences for TG-71 hand calculations drop from ∼(3–14)% to ∼(0–2)%. Conclusion: Monitor units calculated with the correction factors typically decrease the percent difference to under actionable levels, < 5%. While these correction factors work for a majority of patients, there are some patient anatomies that do not fit the assumptions made. Using these factors in hand calculations is a first step in bringing the verification monitor units into agreement with the treatment planning system MU.« less

  5. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...

  6. The robust corrective action priority-an improved approach for selecting competing corrective actions in FMEA based on principle of robust design

    NASA Astrophysics Data System (ADS)

    Sutrisno, Agung; Gunawan, Indra; Vanany, Iwan

    2017-11-01

    In spite of being integral part in risk - based quality improvement effort, studies improving quality of selection of corrective action priority using FMEA technique are still limited in literature. If any, none is considering robustness and risk in selecting competing improvement initiatives. This study proposed a theoretical model to select risk - based competing corrective action by considering robustness and risk of competing corrective actions. We incorporated the principle of robust design in counting the preference score among corrective action candidates. Along with considering cost and benefit of competing corrective actions, we also incorporate the risk and robustness of corrective actions. An example is provided to represent the applicability of the proposed model.

  7. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  8. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Echelard

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  14. Coliform Bacteria Monitoring in Fish Systems: Current Practices in Public Aquaria.

    PubMed

    Culpepper, Erin E; Clayton, Leigh A; Hadfield, Catherine A; Arnold, Jill E; Bourbon, Holly M

    2016-06-01

    Public aquaria evaluate coliform indicator bacteria levels in fish systems, but the purpose of testing, testing methods, and management responses are not standardized, unlike with the coliform bacteria testing for marine mammal enclosures required by the U.S. Department of Agriculture. An online survey was sent to selected aquaria to document current testing and management practices in fish systems without marine mammals. The information collected included indicator bacteria species, the size and type of systems monitored, the primary purpose of testing, sampling frequency, test methods, the criteria for interpreting results, corrective actions, and management changes to limit human exposure. Of the 25 institutions to which surveys were sent, 19 (76%) responded. Fourteen reported testing for fecal indicator bacteria in fish systems. The most commonly tested indicator species were total (86%) and fecal (79%) coliform bacteria, which were detected by means of the membrane filtration method (64%). Multiple types and sizes of systems were tested, and the guidelines for testing and corrective actions were highly variable. Only three institutions performed additional tests to confirm the identification of indicator organisms. The results from this study can be used to compare bacterial monitoring practices and protocols in fish systems, as an aid to discussions relating to the accuracy and reliability of test results, and to help implement appropriate management responses. Received August 23, 2015; accepted December 29, 2015.

  15. Continuous intraoperative neural monitoring of the recurrent nerves in thyroid surgery: a quantum leap in technology

    PubMed Central

    Randolph, Gregory W.; Barczynski, Marcin; Dionigi, Gianlorenzo; Wu, Che-Wei; Chiang, Feng-Yu; Machens, Andreas; Kamani, Dipti; Dralle, Henning

    2016-01-01

    The continuous intraoperative neural monitoring (CIONM) technique is increasingly acknowledged as a useful tool to recognize impending nerve injury and to abort the related manoeuvre to prevent nerve injury during thyroid surgery. CIONM provides valuable real-time information constantly, which is really useful during complex thyroid surgeries especially in the settings of unusual anatomy. Thus, CIONM overcomes the key methodological limitation inherent in intermittent nerve monitoring (IINOM); which is allowing the nerve to be at risk in between the stimulations. The clinically important combined electromyographic (EMG) event, indicative of impending recurrent laryngeal nerve (RLN) injury, prevents the majority of traction related injuries to the anatomically intact RLN enabling modification of the causative surgical manoeuvre in 80% of cases. These EMG changes can progress to loss of EMG signal with postoperative vocal cord palsy (VCP) if corrective action is not taken. As a further extension, CIONM also helps to identify intraoperative functional nerve recovery with restitution of amplitude to ≥50% of initial baseline; this allows continuing of resection of contralateral side. CIONM facilitates for early corrective action before permanent damage to the nerve has been done. CIONM is a recent but rapidly evolving technique, constantly being refined by various studies focusing on improvement in its implementation and interpretation, as well as on the elimination of the technical snags. PMID:28149807

  16. Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    2000-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  18. Actions Underway to Reduce Delinquencies in the Health Professions and Nursing Student Loan Programs.

    ERIC Educational Resources Information Center

    Comptroller General of the U.S., Washington, DC.

    The problem of loan payment delinquency in the Health Professions and Nursing Student Loan Programs was reviewed. Problems that schools have had in billing and collecting outstanding loans and the lack of effective program monitoring by the Department of Health and Human Services (DHHS) were assessed, along with the DHHS' efforts to correct the…

  19. Closure report for Corrective Action Unit 211, Area 15 EPA Farm waste sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  20. CORRECTIVE ACTION DECISION DOCUMENT FOR AREA 9 UXO LANDFILL, TONOPAH TEST RNGE, CAU 453, REVISION 0, MARCH 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none

    1998-03-01

    This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less

  1. 45 CFR 1225.19 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...

  2. 45 CFR 1225.19 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...

  3. Corrective Action Decision Document for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    2005-05-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02,more » Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.« less

  4. Nobody Is Perfect: ERP Effects Prior to Performance Errors in Musicians Indicate Fast Monitoring Processes

    PubMed Central

    Maidhof, Clemens; Rieger, Martina; Prinz, Wolfgang; Koelsch, Stefan

    2009-01-01

    Background One central question in the context of motor control and action monitoring is at what point in time errors can be detected. Previous electrophysiological studies investigating this issue focused on brain potentials elicited after erroneous responses, mainly in simple speeded response tasks. In the present study, we investigated brain potentials before the commission of errors in a natural and complex situation. Methodology/Principal Findings Expert pianists bimanually played scales and patterns while the electroencephalogram (EEG) was recorded. Event-related potentials (ERPs) were computed for correct and incorrect performances. Results revealed differences already 100 ms prior to the onset of a note (i.e., prior to auditory feedback). We further observed that erroneous keystrokes were delayed in time and pressed more slowly. Conclusions Our data reveal neural mechanisms in musicians that are able to detect errors prior to the execution of erroneous movements. The underlying mechanism probably relies on predictive control processes that compare the predicted outcome of an action with the action goal. PMID:19337379

  5. 9 CFR 416.15 - Corrective Actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective action(s) when either the establishment or FSIS determines that the establishment's Sanitation SOP's or...

  6. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada: Revision 0, Including Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-01

    This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less

  8. MO-G-BRE-08: Taxonomy of Corrective Actions in Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sutlief, S; Brown, D

    2014-06-15

    Purpose: Various causal taxonomies have been developed for healthcare incidents and for radiation therapy in particular. The causal analysis of incidents leads to corrective actions which can also be organized into a taxonomy. Such a corrective action classification system would provide information about the situational context, the action type, and the leverage of the action in order to detect patterns in the corrective actions frequently employed in radiation therapy. It would also provide practical guidance to the radiation therapy community for determining the appropriateness and potential effectiveness of proposed corrective actions. Materials: A review of causal analysis reports and correctivemore » action plans was conducted using the following sources: US NRC medical event reports, IAEA reports, ROSIS submissions, US Veterans Health Administration reports, and singleincident report sources. The corrective actions presented in the published sources were then mapped onto four corrective action taxonomy prototypes: role-based, safety-context-based, responsibility-based, and hierarchy of hazard control. The resulting corrective action taxonomy was then validated through use of the published sources. Results: The responsibility-based taxonomy and hierarchy of hazard taxonomy provided more intuitive and sensible categories than the role-based taxonomy or the safety-context taxonomy. The most frequent corrective actions were added safety barriers, training, process standardization, and development of a quality improvement program where one was lacking. Conclusion: Published corrective action statements in radiation therapy emphasize what to do more so than whom the recipient is or which process step is affected. The hierarchy of hazard taxonomy provides a suitable framework for radiation therapy and has the advantage of providing insight into the likelihood that a particular corrective action will mitigate the recurrence of the error it was meant to correct. This information would be useful to medical center administration, safety personnel, and regulators who must assess the projected efficacy of corrective actions. Derek Brown is a director of TreatSafely, LLC.« less

  9. An evaluation of the results of alluvial groundwater sampling from 1987--1990 at the Durango disposal site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-04-01

    This evaluation was conducted to determine if surface discharges of contaminated water from a retention pond and seepage of tailings pore water from the disposal cell have affected ground I water quality in the alluvial deposits east and northeast of the Bodo Canyon disposal cell. The question of whether corrective remedial action is needed for the alluvial groundwater downgradient of the disposal cell is also addressed. Maximum observed concentrations of seven hazardous constituents equalled or exceeded proposed US Environmental Protection Agency (EPA) maximum concentration limits (MCLs) in the alluvial groundwater downgradient of the disposal cell. These constituents include chromium, lead,more » molybdenum, net gross alpha, radium-226 and -228, selenium, and uranium. Concentrations greater than MCLs for molybdenum, net gross alpha, and radium-226 and -228 may be naturally occurring in the alluvial groundwater. There is no statistical evidence that these hazardous constituents are groundwater contaminants with concentrations that exceed the MCLs in alluvial groundwater. However, the median selenium concentration in monitor well 608 exceeds the MCL. Therefore, selenium contamination in the alluvial groundwater in the area of monitor well 608 is possible. Selenium concentrations show no definite increasing or decreasing trend. Since groundwater contamination by selenium is possible in one monitor well, but concentrations are not increasing, corrective action is not warranted at this time. Alluvial groundwater quality will continue to be monitored quarterly and the discharge from the retention pond should be sampled after treatment to ascertain its potential affects on groundwater quality.« less

  10. CORRECTIVE ACTION DECISION DOCUMENT FOR CORRECTIVE ACTION UNIT 383: AREA 12 E-TUNNEL SITES, NEVADA TEST SITE, REV. NO. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark McLane

    2005-03-01

    This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for CAU 383.« less

  11. Hypnotic clever hands: Agency and automatic responding.

    PubMed

    Polito, Vince; Barnier, Amanda J; Connors, Michael H

    2018-06-01

    The Clever Hands task (Wegner, Fuller, & Sparrow, 2003) is a behavioral illusion in which participants make responses to a trivia quiz for which they have no sense of agency. Sixty high hypnotizable participants completed two versions of the Clever Hands task. Quiz One was a replication of the original study. Quiz Two was a hypnotic adaptation using three suggestions that were based on clinical disruptions to the sense of agency. The suggestions were for: random responding, thought insertion, and alien control. These suggestions led to differences in accuracy (action production) and estimates of accuracy (action projection). Specifically, whereas the random responding suggestion had little effect, the two clinically based suggestions had opposite impacts on action production: the thought insertion suggestion led to an increase in the rate of correct responses (although participants still believed they were responding randomly); while the alien control suggestion led to a reduction in the rate of correct answers and a pattern of results that more closely approximated randomness. Contrary to theoretical accounts that claim that hypnosis affects executive monitoring rather than executive control, this result indicates that specific hypnotic suggestions can also influence the implicit processes involved in action production. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  12. [Quality assurance of hospital medical records as a risk management tool].

    PubMed

    Terranova, Giuseppina; Cortesi, Elisabetta; Briani, Silvia; Giannini, Raffaella

    2006-01-01

    A retrospective analysis of hospital medical records was performed jointly by the Medicolegal department of the Pistoia Local Health Unit N. 3 and by the management of the SS. Cosma and Damiano di Pescia Hospital. Evaluation was based on ANDEM criteria, JCAHO standards, and the 1992 discharge abstract guidelines of the Italian Health Ministry. In the first phase of the study, data were collected and processed for each hospital ward and then discussed with clinicians and audited. After auditing, appropriate actions were agreed upon for correcting identified problems. Approximately one year later a second smaller sample of medical records was evaluated and a higher compliance rate with the established corrective actions was found in all wards for all data categories. In this study the evaluation of medical records can be considered in the wider context of risk management, a multidisciplinary process directed towards identifying and monitoring risk through the use of appropriate quality indicators.

  13. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less

  14. 21 CFR 120.10 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 120.10 Section 120.10 Food and... actions. Whenever a deviation from a critical limit occurs, a processor shall take corrective action by... develop written corrective action plans, which become part of their HACCP plans in accordance with § 120.8...

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  16. Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada with ROTC1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2008-05-01

    Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend correctivemore » action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.« less

  17. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The correctivemore » action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.« less

  18. 10 CFR 71.133 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...

  19. 10 CFR 71.133 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...

  20. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less

  1. Predictive modeling for corrective maintenance of imaging devices from machine logs.

    PubMed

    Patil, Ravindra B; Patil, Meru A; Ravi, Vidya; Naik, Sarif

    2017-07-01

    In the cost sensitive healthcare industry, an unplanned downtime of diagnostic and therapy imaging devices can be a burden on the financials of both the hospitals as well as the original equipment manufacturers (OEMs). In the current era of connectivity, it is easier to get these devices connected to a standard monitoring station. Once the system is connected, OEMs can monitor the health of these devices remotely and take corrective actions by providing preventive maintenance thereby avoiding major unplanned downtime. In this article, we present an overall methodology of predicting failure of these devices well before customer experiences it. We use data-driven approach based on machine learning to predict failures in turn resulting in reduced machine downtime, improved customer satisfaction and cost savings for the OEMs. One of the use-case of predicting component failure of PHILIPS iXR system is explained in this article.

  2. Intelligent Chemistry Management System (ICMS)--A new approach to steam generator chemistry control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barto, R.J.; Farrell, D.M.; Noto, F.A.

    1986-04-01

    The Intelligent Chemistry Management System (ICMS) is a new tool which assists in steam generator chemistry control. Utilizing diagnostic capabilities, the ICMS will provide utility and industrial boiler operators, system chemists, and plant engineers with a tool for monitoring, diagnosing, and controlling steam generator system chemistry. By reducing the number of forced outages through early identification of potentially detrimental conditions, suggestion of possible causes, and execution of corrective actions, improvements in unit availability and reliability will result. The system monitors water and steam quality at a number of critical locations in the plant.

  3. Path planning and execution monitoring for a planetary rover

    NASA Technical Reports Server (NTRS)

    Gat, Erann; Slack, Marc G.; Miller, David P.; Firby, R. James

    1990-01-01

    A path planner and an execution monitoring planner that will enable the rover to navigate to its various destinations safely and correctly while detecting and avoiding hazards are described. An overview of the complete architecture is given. Implementation and testbeds are described. The robot can detect unforseen obstacles and take appropriate action. This includes having the rover back away from the hazard and mark the area as untraversable in the in the rover's internal map. The experiments have consisted of paths roughly 20 m in length. The architecture works with a large variety of rover configurations with different kinematic constraints.

  4. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  5. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  6. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  7. 40 CFR 35.3170 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...

  8. 42 CFR 431.246 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...

  9. 16 CFR 1209.37 - Corrective actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Corrective actions. 1209.37 Section 1209.37... SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure. When any test required by § 1209.36 yields failing or unacceptable results, corrective action must be...

  10. 42 CFR 431.246 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...

  11. 40 CFR 35.3170 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...

  12. Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less

  13. Corrective Action Decision Document/Closure Report for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kidman, Raymond; Matthews, Patrick

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less

  15. 40 CFR 192.04 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...

  16. 21 CFR 123.7 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 123.7 Section 123.7 Food and... CONSUMPTION FISH AND FISHERY PRODUCTS General Provisions § 123.7 Corrective actions. (a) Whenever a deviation from a critical limit occurs, a processor shall take corrective action either by: (1) Following a...

  17. 10 CFR 72.172 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...

  18. 45 CFR 1225.10 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...

  19. 9 CFR 417.3 - Corrective actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective actions. 417.3 Section 417... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan shall identify the corrective action to be followed in response to a deviation from a critical limit...

  20. 34 CFR 200.42 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...

  1. 10 CFR 72.172 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...

  2. 34 CFR 200.42 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...

  3. 45 CFR 1225.10 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...

  4. 40 CFR 192.04 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...

  5. Corrective Action Decision Document for Corrective Action Unit 568. Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less

  6. The knowledge-based framework for a nuclear power plant operator advisor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D.W.; Hajek, B.K.

    1989-01-01

    An important facet in the design, development, and evaluation of aids for complex systems is the identification of the tasks performed by the operator. Operator aids utilizing artificial intelligence, or more specifically knowledge-based systems, require identification of these tasks in the context of a knowledge-based framework. In this context, the operator responses to the plant behavior are to monitor and comprehend the state of the plant, identify normal and abnormal plant conditions, diagnose abnormal plant conditions, predict plant response to specific control actions, and select the best available control action, implement a feasible control action, monitor system response to themore » control action, and correct for any inappropriate responses. These tasks have been identified to formulate a knowledge-based framework for an operator advisor under development at Ohio State University that utilizes the generic task methodology proposed by Chandrasekaran. The paper lays the foundation to identify the responses as a knowledge-based set of tasks in accordance with the expected human operator responses during an event. Initial evaluation of the expert system indicates the potential for an operator aid that will improve the operator's ability to respond to both anticipated and unanticipated events.« less

  7. 5 CFR 930.113 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...

  8. 5 CFR 930.113 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloop, Christy

    2013-04-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less

  10. Method and system for providing work machine multi-functional user interface

    DOEpatents

    Hoff, Brian D [Peoria, IL; Akasam, Sivaprasad [Peoria, IL; Baker, Thomas M [Peoria, IL

    2007-07-10

    A method is performed to provide a multi-functional user interface on a work machine for displaying suggested corrective action. The process includes receiving status information associated with the work machine and analyzing the status information to determine an abnormal condition. The process also includes displaying a warning message on the display device indicating the abnormal condition and determining one or more corrective actions to handle the abnormal condition. Further, the process includes determining an appropriate corrective action among the one or more corrective actions and displaying a recommendation message on the display device reflecting the appropriate corrective action. The process may also include displaying a list including the remaining one or more corrective actions on the display device to provide alternative actions to an operator.

  11. Installation Restoration Program Stage 3. McClellan Air Force Base, California. Remedial Investigation/Feasibility Study Groundwater Sampling and Analysis Program Data Summary

    DTIC Science & Technology

    1988-12-01

    and do not refer to monitoring zones at McClellSn AFB. b Priority poLutant metals analyses also included U.S. EPA Methods 206.2, 245.1 and 270.2. EW a...sampling protocol, and the laboratory is audited routinely. Therefore, no corrective action other than good training and supervision is necessary. The same

  12. Re: Request Under the Data Quality Act and EPA's Information Quality Guidelines

    EPA Pesticide Factsheets

    In light of recent statements from EPA in the rulemaking for the Mercury and Air Toxics Standards (MATS Rule), Environmental Integrity Project (EIP) and Chesapeake Climate Action Network (CCAN) submit this Request for Correction to ask EPA to resolve the conflict between the statements from the MATS rulemaking and EPA's earlier position on the accuracy of monitoring of sulfur dioxide (SO2) under the Acid Rain program.

  13. Interactive chemistry management system (ICMS); Field demonstration results at United Illuminating

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noto, F.A.; Farrell, D.M.; Lombard, E.V.

    1988-01-01

    The authors report on a field demonstration of the interactive chemistry management system (ICMS) performed in the late summer of 1987 at the New Haven Harbor Station of United Illuminating Co. This demonstration was the first installation of the ICMS at an actual plant site. The ICMS is a computer-based system designed to monitor, diagnose, and provide optional automatic control of water and steam chemistry throughout the steam generator cycle. It is one of the diagnostic modules that comprises CE-TOPS (combustion engineering total on-line performance system), which continuously monitors operating conditions and suggests priority actions to increase operation efficiency, extendmore » the performance life of boiler components and reduce maintenance costs. By reducing the number of forced outages through early identification of potentially detrimental conditions, diagnosis of possible causes, and execution of corrective actions, improvements in unit availability and reliability will result.« less

  14. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-04-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluatemore » and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.« less

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less

  16. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  17. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  18. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  19. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  20. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  2. Error-Induced Learning as a Resource-Adaptive Process in Young and Elderly Individuals

    NASA Astrophysics Data System (ADS)

    Ferdinand, Nicola K.; Weiten, Anja; Mecklinger, Axel; Kray, Jutta

    Thorndike described in his law of effect [44] that actions followed by positive events are more likely to be repeated in the future, whereas actions that are followed by negative outcomes are less likely to be repeated. This implies that behavior is evaluated in the light of its potential consequences, and non-reward events (i.e., errors) must be detected for reinforcement learning to take place. In short, humans have to monitor their performance in order to detect and correct errors, and this allows them to successfully adapt their behavior to changing environmental demands and acquire new behavior, i.e., to learn.

  3. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    NASA Technical Reports Server (NTRS)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  4. 45 CFR 305.66 - Notice, corrective action year, and imposition of penalty.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... deficiency or deficiencies cited in the notice during the automatic corrective action year (i.e., the... corrected the deficiency or deficiencies cited in the notice by the end of the corrective action year. (d... which the penalty is assessed and which failed to correct the deficiency or deficiencies cited in the...

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less

  6. Corrective Action Investigation Plan for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less

  7. Corrective Action Investigation Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada (December 2002, Revision No.: 0), Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NSO

    The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker.more » Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of contamination, as necessary. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less

  10. 9 CFR 416.15 - Corrective Actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective... the procedures specified therein, or the implementation or maintenance of the Sanitation SOP's, may...

  11. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada, For the Period July 2007-June 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-08-01

    This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110 for the period July 2007 through June 2008. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, perimeter fence, and use restriction (UR) warning signs was good. However, settling was observed thatmore » exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW021 (Nevada Division of Environmental Protection, 2005). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Two areas of settling and cracks were observed on the south and east edges of the cover during the September 2007 inspection that exceeded the action level and required repair. The areas were repaired in October 2007. Additional settling and cracks were observed along the east side of the cover during the December 2007 inspection that exceeded the action level, and the area was repaired in January 2008. Significant animal burrows were also observed during the March 2008 inspection, and small mammal trapping and relocation was performed in April 2008. The semiannual subsidence surveys were performed in September 2007 and March 2008. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.02 m [-0.08 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring overall on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing well. Time Domain Reflectometry (TDR) data show regular changes in the shallow subsurface with significant rain events; however, major changes in volumetric moisture content (VMC) appear to be limited to 1.8 m (6 ft) below ground surface or shallower, depending on the location on the cover. At 2.4 m (8 ft) below the cover surface, TDR data show soil moisture content remained between 9 and 15 percent VMC, depending on the TDR location. The west portion of the cover tends to reflect a lower moisture content and less variability in annual fluctuations in moisture content at this depth. Results of soil moisture monitoring of the cover indicate that VMC at the compliance level (at 2.4 m [8 ft] below the cover surface) is approaching a steady state. If the moisture content at this level remains consistent with recent years, then a recommendation may be made for establishing compliance levels for future monitoring.« less

  12. Lessons Learned from the Space Shuttle Engine Cutoff System (ECO) Anomalies

    NASA Technical Reports Server (NTRS)

    Martinez, Hugo E.; Welzyn, Ken

    2011-01-01

    The Space Shuttle Orbiter's main engine cutoff (ECO) system first failed ground checkout in April, 2005 during a first tanking test prior to Return-to-Flight. Despite significant troubleshooting and investigative efforts that followed, the root cause could not be found and intermittent anomalies continued to plague the Program. By implementing hardware upgrades, enhancing monitoring capability, and relaxing the launch rules, the Shuttle fleet was allowed to continue flying in spite of these unexplained failures. Root cause was finally determined following the launch attempts of STS-122 in December, 2007 when the anomalies repeated, which allowed drag-on instrumentation to pinpoint the fault (the ET feedthrough connector). The suspect hardware was removed and provided additional evidence towards root cause determination. Corrective action was implemented and the system has performed successfully since then. This white paper presents the lessons learned from the entire experience, beginning with the anomalies since Return-to-Flight through discovery and correction of the problem. To put these lessons in better perspective for the reader, an overview of the ECO system is presented first. Next, a chronological account of the failures and associated investigation activities is discussed. Root cause and corrective action are summarized, followed by the lessons learned.

  13. Brief Communication: On the rapid and efficient monitoring results dissemination in landslide emergency scenarios: the Mont de La Saxe case study

    NASA Astrophysics Data System (ADS)

    Giordan, D.; Manconi, A.; Allasia, P.; Bertolo, D.

    2015-09-01

    Straightforward communication of monitoring results is of major importance in emergency scenarios relevant to large slope instabilities. Here we describe the communication strategy developed for the Mont de La Saxe rockslide threatening La Palud and Entrèves hamlets in the Courmayeur municipality (Aosta Valley, Italy). Starting from the definition of actions and needs of the landslide management team, including scientists, technicians, civil protection operators, decision makers, and politicians, we show that sharing and disseminating ad hoc information simplifies the understanding of the landslide evolution, as well as the correct communication of the level of criticality.

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less

  15. Prognostics & Health Management: A NASA Perspective

    NASA Technical Reports Server (NTRS)

    Boyer, Roger L.

    2015-01-01

    How can advanced automation techniques developed by NASA to perform Fault Detection, Isolation, and Recovery (FDIR) in space missions be used here on Earth in the Oil & Gas industry? Whether on a Mars orbiter or an oil platform, having an intelligent machine to back up the crew/operators to help monitor and diagnose the systems for possible problems and aid in determining a corrective action/response is an important and useful attribute for multiple industries.

  16. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less

  18. Corrective Action Investigation Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental corrective action alternatives. Corrective Action Unit 151 is located in Areas 2, 12, 18, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 151 is comprised of the nine Corrective Action Sites (CAS) listed below: (1) 02-05-01, UE-2ce Pond; (2)more » 12-03-01, Sewage Lagoons (6); (3) 12-04-01, Septic Tanks; (4) 12-04-02, Septic Tanks; (5) 12-04-03, Septic Tank; (6) 12-47-01, Wastewater Pond; (7) 18-03-01, Sewage Lagoon; (8) 18-99-09, Sewer Line (Exposed); and (9) 20-19-02, Photochemical Drain. The CASs within CAU 151 are discharge and collection systems. Corrective Action Site 02-05-01 is located in Area 2 and is a well-water collection pond used as a part of the Nash test. Corrective Action Sites 12-03-01, 12-04-01, 12-04-02, 12-04-03, and 12-47-01 are located in Area 12 and are comprised of sewage lagoons, septic tanks, associated piping, and two sumps. The features are a part of the Area 12 Camp housing and administrative septic systems. Corrective Action Sites 18-03-01 and 18-99-09 are located in the Area 17 Camp in Area 18. These sites are sewage lagoons and associated piping. The origin and terminus of CAS 18-99-09 are unknown; however, the type and configuration of the pipe indicates that it may be a part of the septic systems in Area 18. Corrective Action Site 20-19-02 is located in the Area 20 Camp. This site is comprised of a surface discharge of photoprocessing chemicals.« less

  19. NASA Audit Follow-up Handbook

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This NASA Audit Follow-up Handbook is issued pursuant to the requirements of the Office of Management and Budget (OMB) Circular A-50, Audit Follow-up, dated September 29, 1982. It sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for use when considering reports issued by the Office of Inspector General (OIG), other executive branch audit organizations, the Defense Contract Audit Agency (DCAA), and the General Accounting Office (GAO). It is intended to: specify principal roles; strengthen the procedures for management decisions (resolution) on audit findings and corrective action on audit report recommendations; emphasize the importance of monitoring agreed upon corrective actions to assure actual accomplishment; and foster the use of audit reports as effective tools of management. A flow chart depicting the NASA audit and management decision process is in Appendix A. This handbook is a controlled handbook issued in loose-leaf form and will be revised by page changes. Additional copies for internal use may be obtained through normal distribution channels.

  20. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less

  1. 78 FR 45983 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; withdrawal... withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based... determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle...

  2. Documents Pertaining to Resource Conservation and Recovery Act Corrective Action Event Codes

    EPA Pesticide Factsheets

    Document containing RCRA Corrective Action event codes and definitions, including national requirements, initiating sources, dates, and guidance, from the first facility assessment until the Corrective Action is terminated.

  3. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamationmore » and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov« less

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 106: Area 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews and Dawn Peterson

    2011-09-01

    Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less

  5. Monitoring programs need to take into account imperfect species detectability

    USGS Publications Warehouse

    Kery, M.; Schmid, Hans

    2004-01-01

    Biodiversiry monitoring is important to identify biological units in need of conservation and to check the effectiveness of conservation actions. Programs generally monitor species richness and its changes (trend). Usually, no correction is made for imperfect species detectability. Instead, it is assumed that each species present has the same probability of being recorded and that there is no difference in this detectability across space and time, e.g. among observers and habitats. Consequently, species richness is determined by enumeration as the sum of species recorded. In Switzerland, the federal government has recently launched a comprehensive program that aims at detecting changes in biodiversity at all levels of biological integration. Birds are an important part of that program. Since 1999, 23 visits per breeding season are made to each of >250 1 km2 squares to map the territories of all detected breeding bird species. Here, we analyse data from three squares to illustrate the use of capture-recapture models in monitoring to obtain detectability-corrected estimates of species richness and trend. Species detectability averaged only 85%. Hence an estimated 15% of species present remained overlooked even after three visits. Within a square, changes in detectability for different years were of the same magnitude when surveys were conducted by the same observer as when they were by different observers. Estimates of trend were usually biased and community turnover was overestimated when based on enumeration. Here we use bird data as an illustration of methods. However, species detectability for any taxon is unlikely ever to be perfect or even constant across categories to be compared. Therefore, monitoring programs should correct for species detectability.

  6. Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  7. Addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  8. Addendum 2 to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  9. Apollo experience report: Problem reporting and corrective action system

    NASA Technical Reports Server (NTRS)

    Adams, T. J.

    1974-01-01

    The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.

  10. Corrective Action Investigation Plan for Corrective Action Unit 576: Miscellaneous Radiological Sites and Debris Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24more » (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).« less

  11. 40 CFR 258.73 - Financial assurance for corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...

  12. 40 CFR 258.73 - Financial assurance for corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...

  13. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  15. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  16. 4 CFR 28.131 - Corrective action proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT THE GOVERNMENT ACCOUNTABILITY OFFICE Corrective Action, Disciplinary and Stay Proceedings § 28.131 Corrective action proceedings...

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less

  18. Intelligent Tutoring Systems for Procedural Task Training of Remote Payload Operations at NASA

    NASA Technical Reports Server (NTRS)

    Ong, James; Noneman, Steven

    2000-01-01

    Intelligent Tutoring Systems (ITSs) encode and apply the subject matter and teaching expertise of experienced instructors to provide students with individualized instruction automatically. ITSs complement training simulators by providing automated instruction when it is not economical or feasible to dedicate an instructor to each student during training simulations. Despite their proven training effectiveness and favorable operating cost, however, relatively few ITSs are in use. This is largely because it is usually costly and difficult to encode the task knowledge used by the ITS to evaluate the student's actions and assess the student's performance. Procedural tasks are tasks for which there exist procedures, guidelines, and strategies that determine the correct set of steps to be taken within each situation. To lower the cost and difficulty of creating tutoring systems for procedural task training, Stottler Henke Associates, Inc. (SHAI) worked closely with the Operations Training Group at NASA's Marshall Space Flight Center to develop the Task Tutor Toolkit (T (exp 3)), a generic tutoring system shell and scenario authoring tool. The Task Tutor Toolkit employs a case-based reasoning approach where the instructor creates a procedure template that specifies the range of student actions that are "correct" within each scenario. Because each procedure template is specific to a single scenario, the system can employ relatively simple reasoning methods to represent a correct set of actions and assess student performance. This simplicity enables a non-programmer to specify task knowledge quickly and easily by via graphical user interface, using a "demonstrate, generalize, and annotate" paradigm, that recognizes the range of possible valid actions and infers principles understood (or misunderstood) by the student when those actions are carried out. The Task Tutor Toolkit was also designed to be modular and general, so that it can be interfaced with a wide range of training simulators and support a variety of training domains. SHAI and NASA applied the Task Tutor Toolkit to create the Remote Payload Operations Tutor (RPOT). RPOT is a specific tutoring system application which lets scientists who are new to space mission operations learn to monitor and control their experiments aboard the International Space Station according to NASA payload regulations, guidelines, and procedures. The RPOT simulator lets students practice these skills by monitoring the telemetry variable values of a simple, hypothetical experiment, sending commands to the experiment, coordinating with NASA personnel via voice communication loops, and submitting and retrieving information via documents and forms. At the end of each scenario, RPOT displays the principles correctly or incorrectly demonstrated by the student, along with explanations and background information. The effectiveness of RPOT and the Task Tutor Toolkit are currently under evaluation at NASA.

  19. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less

  20. 34 CFR 200.49 - SEA responsibilities for school improvement, corrective action, and restructuring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false SEA responsibilities for school improvement, corrective... Agencies Lea and School Improvement § 200.49 SEA responsibilities for school improvement, corrective action... subject to corrective action on January 7, 2002, the SEA must ensure that the LEA for that school provides...

  1. 77 FR 48168 - Correction for Notice of Realty Action; Recreation and Public Purposes Act Classification...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD09000.L14300000.ES0000; CACA- 051457] Correction for Notice of Realty Action; Recreation and Public Purposes Act Classification; California AGENCY: Bureau of Land Management, Interior. ACTION: Correction SUMMARY: This notice corrects a Notice of Realty...

  2. Corrective Action Sites around the Nation

    EPA Pesticide Factsheets

    Provide info to the public/community orgs, local officials & consultants on nearby corrective action cleanups, the status of the cleanup and future plans. Links to the Natl Corrective Action, Cleanups in My Community & Cleaning Up Our Land, Water & Air

  3. 16 CFR 1209.37 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...

  4. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment corrective actions/compliance schedule approval report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Biebesheimer, E.

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.

  5. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  6. Taking two to tango: fMRI analysis of improvised joint action with physical contact

    PubMed Central

    Belyk, Michel; Brown, Steven

    2018-01-01

    Many forms of joint action involve physical coupling between the participants, such as when moving a sofa together or dancing a tango. We report the results of a novel two-person functional MRI study in which trained couple dancers engaged in bimanual contact with an experimenter standing next to the bore of the magnet, and in which the two alternated between being the leader and the follower of joint improvised movements. Leading showed a general pattern of self-orientation, being associated with brain areas involved in motor planning, navigation, sequencing, action monitoring, and error correction. In contrast, following showed a far more sensory, externally-oriented pattern, revealing areas involved in somatosensation, proprioception, motion tracking, social cognition, and outcome monitoring. We also had participants perform a “mutual” condition in which the movement patterns were pre-learned and the roles were symmetric, thereby minimizing any tendency toward either leading or following. The mutual condition showed greater activity in brain areas involved in mentalizing and social reward than did leading or following. Finally, the analysis of improvisation revealed the dual importance of motor-planning and working-memory areas. We discuss these results in terms of theories of both joint action and improvisation. PMID:29324862

  7. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 274: Septic Systems, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-09-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less

  9. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closedmore » by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.« less

  10. Mayan Children's Creation of Learning Ecologies by Initiative and Cooperative Action.

    PubMed

    de León, Lourdes

    2015-01-01

    This chapter examines Mayan children's initiatives in creating their own learning environments in collaboration with others as they engage in culturally relevant endeavors of family and community life. To this end, I carry out a fine-grained ethnographic and linguistic analysis of the interactional emergence of learning ecologies. Erickson defines learning ecology as a socioecological system where participants mutually influence one another through verbal and nonverbal actions, as well as through other forms of semiotic communication (2010, 254). In analyzing learning ecologies, I adopt a "theory of action" approach, taking into account multimodal communication (e.g., talk, gesture, gaze, body positioning), participants' sociospatial organization, embodied action, objects, tools, and other culturally relevant materials brought together to build action (Goodwin, 2000, 2013; Hutchins, 1995). I use microethnographic analysis (Erickson, 1992) to bring to the surface central aspects of children's agentive roles in learning through "cooperative actions" (Goodwin, 2013) and "hands-on" experience (Ingold, 2007) the skills of competent members of their community. I examine three distinct Learning Ecologies created by children's initiatives among the Mayan children that I observed: (i) children requesting guidance to collaborate in a task, (ii) older children working on their own initiative with subsequent monitoring and correction from competent members, and (iii) children with near competence in a task with occasional monitoring and no guidance. I argue that these findings enrich and add power to models of family- and community-based learning such as Learning by Observing and Pitching In (Rogoff, 2014). © 2015 Elsevier Inc. All rights reserved.

  11. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1 and No. 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less

  12. Use of failure mode effect analysis (FMEA) to improve medication management process.

    PubMed

    Jain, Khushboo

    2017-03-13

    Purpose Medication management is a complex process, at high risk of error with life threatening consequences. The focus should be on devising strategies to avoid errors and make the process self-reliable by ensuring prevention of errors and/or error detection at subsequent stages. The purpose of this paper is to use failure mode effect analysis (FMEA), a systematic proactive tool, to identify the likelihood and the causes for the process to fail at various steps and prioritise them to devise risk reduction strategies to improve patient safety. Design/methodology/approach The study was designed as an observational analytical study of medication management process in the inpatient area of a multi-speciality hospital in Gurgaon, Haryana, India. A team was made to study the complex process of medication management in the hospital. FMEA tool was used. Corrective actions were developed based on the prioritised failure modes which were implemented and monitored. Findings The percentage distribution of medication errors as per the observation made by the team was found to be maximum of transcription errors (37 per cent) followed by administration errors (29 per cent) indicating the need to identify the causes and effects of their occurrence. In all, 11 failure modes were identified out of which major five were prioritised based on the risk priority number (RPN). The process was repeated after corrective actions were taken which resulted in about 40 per cent (average) and around 60 per cent reduction in the RPN of prioritised failure modes. Research limitations/implications FMEA is a time consuming process and requires a multidisciplinary team which has good understanding of the process being analysed. FMEA only helps in identifying the possibilities of a process to fail, it does not eliminate them, additional efforts are required to develop action plans and implement them. Frank discussion and agreement among the team members is required not only for successfully conducing FMEA but also for implementing the corrective actions. Practical implications FMEA is an effective proactive risk-assessment tool and is a continuous process which can be continued in phases. The corrective actions taken resulted in reduction in RPN, subjected to further evaluation and usage by others depending on the facility type. Originality/value The application of the tool helped the hospital in identifying failures in medication management process, thereby prioritising and correcting them leading to improvement.

  13. 75 FR 29803 - Agency Information Collection Activity Seeking OMB Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... action to correct unsafe conditions in aircraft, engines, propellers, and appliances. Reports of... issued to require correct corrective action to correct unsafe conditions in aircraft, engines, propellers...

  14. Evaluation of Corrective Action Team (CAT) Leader Training in Aeronautical Systems Division

    DTIC Science & Technology

    1991-09-01

    00A DI EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION CA THESIS Kirk J. Streitrater, Captain, USAF AFIT...EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Kirk J. Streitmater, Captain, USAF AFIT/GSM/LSR/91S-25...8217, , C- s :C AFIT/GSM/LSR/91S-25 EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Presented to the

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick K.

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justificationmore » and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.« less

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick and Sloop, Christy

    2011-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less

  17. CY2017 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada: (January 2017–December 2017), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rehfeldt, Ken; Haight, Brian

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitoredmore » to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2017. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The 86,000-picocuries-per-liter (pCi/L) tritium concentration in one of the wells is about 12 percent higher than measured in 2016 but is over an order of magnitude less than the peak value measured in the well in 1980. The concentration in the other source/plume well is lower than measured in 2016. The water-level monitoring network includes 16 wells. Depth to water measured in 2017 is generally consistent with recent measurements for most wells. Water-level declines differing from long-term trends were observed in four wells. Three of these (WW-4, WW-4A, and WW-5B) are water-supply wells that experienced increases in pumping during the year. No definitive cause for the sharp decline in the fourth well (ER-5-3-2) in 2016 is known as yet. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.« less

  18. 40 CFR 147.2914 - Corrective action for wells authorized by rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... potential endangerment of an USDW, then action as described in paragraph (a) (1) or (2) of this section must... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Corrective action for wells authorized... PROGRAMS Osage Mineral Reserve-Class II Wells § 147.2914 Corrective action for wells authorized by rule...

  19. Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada with ROTCs 1, 2, and 3 (Revision 0, September 2000)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrews, Robert; Marutzky, Sam

    2000-09-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less

  20. External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sam Marutzky

    2010-09-01

    An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked withmore » addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studies—the next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in models of flow and transport in the Frenchman Flat except for a few deficiencies described in the report. Finally, the peer review team concludes that the UGTA subproject has explored a wide range of variations in assumptions, methods, and data, and should proceed to the next stage with an emphasis on monitoring studies. The corrective action strategy, as described in the Federal Facility Agreement and Consent Order, states that the groundwater flow and transport models for each corrective action unit will consider, at a minimum, the following: • Alternative hydrostratigraphic framework models of the modeling domain. • Uncertainty in the radiological and hydrological source terms. • Alternative models of recharge. • Alternative boundary conditions and groundwater flows. • Multiple permissive sets of calibrated flow models. • Probabilistic simulations of transport using plausible sets of alternative framework and recharge models, and boundary and groundwater flows from calibrated flow models. • Ensembles of forecasts of contaminant boundaries. • Sensitivity and uncertainty analyses of model outputs. The peer review team finds that these minimum requirements have been met. While the groundwater modeling and uncertainty analyses have been quite detailed, the peer review team has identified several modeling-related issues that should be addressed in the next phase of the corrective action activities: • Evaluating and using water-level gradients from the pilot wells at the Area 5 Radioactive Waste Management Site in model calibration. • Re-evaluating the use of geochemical age-dating data to constrain model calibrations. • Developing water budgets for the alluvial and upper volcanic aquifer systems in Frenchman Flat. • Considering modeling approaches in which calculated groundwater flow directions near the water table are not predetermined by model boundary conditions and areas of recharge, all of which are very uncertain. • Evaluating local-scale variations in hydraulic conductivity on the calculated contaminant boundaries. • Evaluating the effects of non-steady-state flow conditions on calculated contaminant boundaries, including the effects of long-term declines in water levels, climatic change, and disruption of groundwater system by potential earthquake faulting along either of the two major controlling fault zones in the flow system (the Cane Spring and Rock Valley faults). • Considering the use of less-complex modeling approaches. • Evaluating the large change in water levels in the vicinity of the Frenchman Flat playa and developing a conceptual model to explain these water-level changes. • Developing a long-term groundwater level monitoring program for Frenchman Flat with regular monitoring of water levels at key monitoring wells. Despite these reservations, the peer review team strongly believes that the UGTA subproject should proceed to the next stage.« less

  1. Monitoring robot actions for error detection and recovery

    NASA Technical Reports Server (NTRS)

    Gini, M.; Smith, R.

    1987-01-01

    Reliability is a serious problem in computer controlled robot systems. Although robots serve successfully in relatively simple applications such as painting and spot welding, their potential in areas such as automated assembly is hampered by programming problems. A program for assembling parts may be logically correct, execute correctly on a simulator, and even execute correctly on a robot most of the time, yet still fail unexpectedly in the face of real world uncertainties. Recovery from such errors is far more complicated than recovery from simple controller errors, since even expected errors can often manifest themselves in unexpected ways. Here, a novel approach is presented for improving robot reliability. Instead of anticipating errors, researchers use knowledge-based programming techniques so that the robot can autonomously exploit knowledge about its task and environment to detect and recover from failures. They describe preliminary experiment of a system that they designed and constructed.

  2. Implementing AORN recommended practices for sterile technique.

    PubMed

    Kennedy, Lynne

    2013-07-01

    Using sterile technique helps prevent the surgical environment from becoming contaminated and thus can help reduce the incidence of surgical site infection. The AORN "Recommended practices for sterile technique" provides guidance for setting up, maintaining, and monitoring a sterile field. Topics include the use of surgical attire and personal protective equipment; appropriate selection and evaluation of surgical gowns, gloves, and drape products for each procedure; use of sterile technique to don sterile gowns and gloves; appropriate methods for establishing and monitoring a sterile field; and techniques to ensure that items such as surgical instruments that may be contaminated are not used. Breaks in sterile technique should be corrected immediately unless the actions necessary would endanger the patient. If remedial actions must be delayed, they should be undertaken as soon as possible. Adhering to best practices for sterile technique requires remaining up to date with new approaches and incorporating these into quality initiatives. Copyright © 2013 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  3. Corrective Action Decision Document for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, Nevada Operations Office

    2000-02-08

    This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less

  4. Corrective Action Decision Document for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2008-02-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less

  5. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2015 and FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A; Miller, Julianne J; McCurdy, Greg

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff. This activity supports Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closuremore » design and post-closure monitoring program.« less

  6. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2013 and FY2014 (revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Miller, Julianne J.; McCurdy, Greg D.

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff, which supports National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closure designmore » and post-closure monitoring program.« less

  7. Brief Communication: On the rapid and efficient monitoring results dissemination in landslide emergency scenarios: the Mont de La Saxe case study

    NASA Astrophysics Data System (ADS)

    Giordan, D.; Manconi, A.; Allasia, P.; Bertolo, D.

    2015-04-01

    Straightforward communication of monitoring results is of major importance in emergency scenarios relevant to large slope instabilities. Here we describe the communication strategy developed for the Mont de La Saxe case study, a large rockslide threatening La Palud and Entrèves hamlets in the Courmayeur municipality (Aosta Valley, Italy). Starting from the definition of actions and needs of the Landslide Management Team, including scientists, technicians, civil protection operators, decision makers, and politicians, we show that sharing and disseminating ad hoc information simplifies the understanding of the landslide evolution, as well as the correct communication of the level of criticality.

  8. Corrective Action Investigation Plan for Corrective Action Unit 527: Horn Silver Mine, Nevada Test Site, Nevada: Revision 1 (Including Records of Technical Change No.1, 2, 3, and 4)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  9. Corrective Action Investigation Plan for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0, with ROTC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of themore » nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.« less

  10. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less

  11. Resource Conservation and Recovery Act (RCRA) Corrective Action Training: Strategies for Meeting the 2020 Vision

    EPA Pesticide Factsheets

    RCRA Corrective Action training to develop and enhance the skills of qualified personnel who will implement corrective actions for their sites by the year 2020 that are protective of human health and the environment while encouraging revitalization.

  12. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... additional information or to develop and submit a corrective action plan for responding to contaminated soils...

  13. 40 CFR 35.3170 - Corrective action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...

  14. 40 CFR 35.3170 - Corrective action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...

  15. 40 CFR 35.3170 - Corrective action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...

  16. Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less

  17. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less

  19. 40 CFR 63.1382 - Emission standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complete corrective actions in a timely manner according to the procedures in the operations, maintenance... or operator must initiate corrective action within 1 hour of an alarm from a bag leak detection system and complete corrective actions in a timely manner according to the procedures in the operations...

  20. 9 CFR 417.3 - Corrective actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...

  1. 9 CFR 417.3 - Corrective actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...

  2. 9 CFR 417.3 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...

  3. 9 CFR 417.3 - Corrective actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...

  4. Sensory-based expert monitoring and control

    NASA Astrophysics Data System (ADS)

    Yen, Gary G.

    1999-03-01

    Field operators use their eyes, ears, and nose to detect process behavior and to trigger corrective control actions. For instance: in daily practice, the experienced operator in sulfuric acid treatment of phosphate rock may observe froth color or bubble character to control process material in-flow. Or, similarly, (s)he may use acoustic sound of cavitation or boiling/flashing to increase or decrease material flow rates in tank levels. By contrast, process control computers continue to be limited to taking action on P, T, F, and A signals. Yet, there is sufficient evidence from the fields that visual and acoustic information can be used for control and identification. Smart in-situ sensors have facilitated potential mechanism for factory automation with promising industry applicability. In respond to these critical needs, a generic, structured health monitoring approach is proposed. The system assumes a given sensor suite will act as an on-line health usage monitor and at best provide the real-time control autonomy. The sensor suite can incorporate various types of sensory devices, from vibration accelerometers, directional microphones, machine vision CCDs, pressure gauges to temperature indicators. The decision can be shown in a visual on-board display or fed to the control block to invoke controller reconfigurration.

  5. Quiet Clean Short-haul Experimental Engine (QCSEE) over-the-wing control system design report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A control system incorporating a digital electronic control was designed for the over-the-wing engine. The digital electronic control serves as the primary controlling element for engine fuel flow and core compressor stator position. It also includes data monitoring capability, a unique failure indication and corrective action feature, and optional provisions for operating with a new type of servovalve designed to operate in response to a digital-type signal and to fail with its output device hydraulically locked into position.

  6. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2006-08-01

    This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2005 through June 2006. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and UR warning signs was good. Settling was observed thatmore » exceeded the action level as specified in Section VILB.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Along the east edge of the cover (repaired previously in August 2003, December 2003, May 2004, October 2004), an area of settling was observed during the December 2005 inspection to again be above the action level, and required repair. This area and two other areas of settling on the cover that were first observed during the December 2005 inspection were repaired in February 2006. The semiannual subsidence surveys were done in September 2005 and March 2006. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.015 m [-0.05 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing as expected. Time Domain Reflectometry (TDR) data indicated an increase in soil moisture (1 to 3% VMC change) at a depth of 1.8 m (6 ft.) due to the exceptionally heavy precipitation from the January and February 2005 precipitation events. The moisture profile returned to baseline conditions by October 2005. At 2.4 m (8 ft) below the cover surface, TDR data show soil moisture content remained between 10 and 13 percent VMC. Considering the heavy precipitation experience in this and the previous reporting period, a compliance level will be established when the system reaches a steady state and equilibrium has been established.« less

  7. Verification of monitor unit calculations for non-IMRT clinical radiotherapy: report of AAPM Task Group 114.

    PubMed

    Stern, Robin L; Heaton, Robert; Fraser, Martin W; Goddu, S Murty; Kirby, Thomas H; Lam, Kwok Leung; Molineu, Andrea; Zhu, Timothy C

    2011-01-01

    The requirement of an independent verification of the monitor units (MU) or time calculated to deliver the prescribed dose to a patient has been a mainstay of radiation oncology quality assurance. The need for and value of such a verification was obvious when calculations were performed by hand using look-up tables, and the verification was achieved by a second person independently repeating the calculation. However, in a modern clinic using CT/MR/PET simulation, computerized 3D treatment planning, heterogeneity corrections, and complex calculation algorithms such as convolution/superposition and Monte Carlo, the purpose of and methodology for the MU verification have come into question. In addition, since the verification is often performed using a simpler geometrical model and calculation algorithm than the primary calculation, exact or almost exact agreement between the two can no longer be expected. Guidelines are needed to help the physicist set clinically reasonable action levels for agreement. This report addresses the following charges of the task group: (1) To re-evaluate the purpose and methods of the "independent second check" for monitor unit calculations for non-IMRT radiation treatment in light of the complexities of modern-day treatment planning. (2) To present recommendations on how to perform verification of monitor unit calculations in a modern clinic. (3) To provide recommendations on establishing action levels for agreement between primary calculations and verification, and to provide guidance in addressing discrepancies outside the action levels. These recommendations are to be used as guidelines only and shall not be interpreted as requirements.

  8. Evaluation of corrective measures implemented for the preventive conservation of fresco paintings in Ariadne’s house (Pompeii, Italy)

    PubMed Central

    2013-01-01

    Background A microclimate monitoring study was conducted in 2008 aimed at assessing the conservation risks affecting the valuable wall paintings decorating Ariadne’s House (Pompeii, Italy). It was found that thermohygrometric conditions were very unfavorable for the conservation of frescoes. As a result, it was decided to implement corrective measures, and the transparent polycarbonate sheets covering three rooms (one of them delimited by four walls and the others composed of three walls) were replaced by opaque roofs. In order to examine the effectiveness of this measure, the same monitoring system comprised by 26 thermohygrometric probes was installed again in summer 2010. Data recorded in 2008 and 2010 were compared. Results Microclimate conditions were also monitored in a control room with the same roof in both years. The average temperature in this room was lower in 2010, and it was decided to consider a time frame of 18 summer days with the same mean temperature in both years. In the rooms with three walls, the statistical analysis revealed that the diurnal maximum temperature decreased about 3.5°C due to the roof change, and the minimum temperature increased 0.5°C. As a result, the daily thermohygrometric variations resulted less pronounced in 2010, with a reduction of approximately 4°C, which is favorable for the preservation of mural paintings. In the room with four walls, the daily fluctuations also decreased about 4°C. Based on the results, other alternative actions are discussed aimed at improving the conservation conditions of wall paintings. Conclusions The roof change has reduced the most unfavorable thermohygrometric conditions affecting the mural paintings, but additional actions should be adopted for a long term preservation of Pompeian frescoes. PMID:23683173

  9. Evaluation of corrective measures implemented for the preventive conservation of fresco paintings in Ariadne's house (Pompeii, Italy).

    PubMed

    Merello, Paloma; García-Diego, Fernando-Juan; Zarzo, Manuel

    2013-05-17

    A microclimate monitoring study was conducted in 2008 aimed at assessing the conservation risks affecting the valuable wall paintings decorating Ariadne's House (Pompeii, Italy). It was found that thermohygrometric conditions were very unfavorable for the conservation of frescoes. As a result, it was decided to implement corrective measures, and the transparent polycarbonate sheets covering three rooms (one of them delimited by four walls and the others composed of three walls) were replaced by opaque roofs. In order to examine the effectiveness of this measure, the same monitoring system comprised by 26 thermohygrometric probes was installed again in summer 2010. Data recorded in 2008 and 2010 were compared. Microclimate conditions were also monitored in a control room with the same roof in both years. The average temperature in this room was lower in 2010, and it was decided to consider a time frame of 18 summer days with the same mean temperature in both years. In the rooms with three walls, the statistical analysis revealed that the diurnal maximum temperature decreased about 3.5°C due to the roof change, and the minimum temperature increased 0.5°C. As a result, the daily thermohygrometric variations resulted less pronounced in 2010, with a reduction of approximately 4°C, which is favorable for the preservation of mural paintings. In the room with four walls, the daily fluctuations also decreased about 4°C. Based on the results, other alternative actions are discussed aimed at improving the conservation conditions of wall paintings. The roof change has reduced the most unfavorable thermohygrometric conditions affecting the mural paintings, but additional actions should be adopted for a long term preservation of Pompeian frescoes.

  10. Consolidation of cloud computing in ATLAS

    NASA Astrophysics Data System (ADS)

    Taylor, Ryan P.; Domingues Cordeiro, Cristovao Jose; Giordano, Domenico; Hover, John; Kouba, Tomas; Love, Peter; McNab, Andrew; Schovancova, Jaroslava; Sobie, Randall; ATLAS Collaboration

    2017-10-01

    Throughout the first half of LHC Run 2, ATLAS cloud computing has undergone a period of consolidation, characterized by building upon previously established systems, with the aim of reducing operational effort, improving robustness, and reaching higher scale. This paper describes the current state of ATLAS cloud computing. Cloud activities are converging on a common contextualization approach for virtual machines, and cloud resources are sharing monitoring and service discovery components. We describe the integration of Vacuum resources, streamlined usage of the Simulation at Point 1 cloud for offline processing, extreme scaling on Amazon compute resources, and procurement of commercial cloud capacity in Europe. Finally, building on the previously established monitoring infrastructure, we have deployed a real-time monitoring and alerting platform which coalesces data from multiple sources, provides flexible visualization via customizable dashboards, and issues alerts and carries out corrective actions in response to problems.

  11. 7 CFR 1730.25 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Corrective action. 1730.25 Section 1730.25... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.25 Corrective action. (a) For any items on the RUS Form 300 rated unsatisfactory (i.e., 0 or 1) by the borrower...

  12. 40 CFR 264.101 - Corrective action for solid waste management units.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...

  13. 40 CFR 264.101 - Corrective action for solid waste management units.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...

  14. 40 CFR 264.101 - Corrective action for solid waste management units.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...

  15. 40 CFR 264.101 - Corrective action for solid waste management units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...

  16. 40 CFR 264.101 - Corrective action for solid waste management units.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...

  17. Eighteen- and 24-Month-Old Infants Correct Others in Anticipation of Action Mistakes

    ERIC Educational Resources Information Center

    Knudsen, Birgit; Liszkowski, Ulf

    2012-01-01

    Much of human communication and collaboration is predicated on making predictions about others' actions. Humans frequently use predictions about others' action mistakes to correct others and spare them mistakes. Such anticipatory correcting reveals a social motivation for unsolicited helping. Cognitively, it requires forward inferences about…

  18. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that themore » landfill cells were used for solid waste disposal, including disposal of UXO.« less

  19. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less

  20. 5 CFR 735.103 - What other regulations pertain to employee conduct?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... employee's violation of those regulations may cause the employee's agency to take disciplinary action, or corrective action as that term is used in 5 CFR part 2635. Such disciplinary action or corrective action may...

  1. Electrophysiological evidence of enhanced performance monitoring in recently abstinent alcoholic men

    PubMed Central

    Padilla, Mayra L.; Sullivan, Edith V.; Mayer, Benjamin Z.; Turlington, Sharon R.; Hoffman, Lindsay R.; Wagstaff, Amanda E.; Pfefferbaum, Adolf

    2010-01-01

    Rationale Chronic alcoholism is associated with mild to moderate cognitive impairment. Under certain conditions, impairment can be ameliorated by invoking compensatory processes. Objective To identify electrophysiological mechanisms of such compensation that would be required to resolve response conflict. Methods 14 abstinent alcoholic men and 14 similarly aged control men performed a variation of the Eriksen flanker task during an electroencephalography (EEG) recording to examine whether alcoholics could achieve and maintain control-level performance and whether EEG markers could identify evidence for the action of compensatory processes in the alcoholics. Monitoring processes engaged following a response were indexed by the correct related negativity (CRN) and error related negativity (ERN), two medial–frontal negative event-related potentials. Results The alcoholics were able to perform at control levels on accuracy and reaction time (RT). Alcoholics generated larger ERN amplitudes following incorrect responses and larger CRNs following correct responses than controls. Both groups showed evidence of post-error slowing. Larger CRN amplitudes in the alcoholics were related to longer RTs. Also observed in the alcoholics was an association between smaller CRN amplitudes and length of sobriety, suggesting a normalization of monitoring activity with extended abstinence. Conclusions To the extent that greater amplitude of these electrophysiological markers of performance monitoring indexes greater resource allocation and performance compensation, the larger amplitudes observed in the alcoholic than control group support the view that elevated performance monitoring enables abstinent alcoholics to overcome response conflict, as was evident in their control-level performance. PMID:20941595

  2. A new risk and stochastic analysis of monitoring and remediation in subsurface contamination

    NASA Astrophysics Data System (ADS)

    Papapetridis, K.; Paleologos, E.

    2012-04-01

    Sanitary landfills constitute the most widely used management approach for the disposal of solid wastes because of their simplicity and cost effectiveness. However, historical records indicate that landfills exhibit a high failure rate of groundwater contamination. Successful detection of aquifer contamination via monitoring wells is a complicated problem with many factors, such as the heterogeneity of the geologic environment, the dispersion of contamination into the geologic medium, the quantity and nature of the contaminants, the number and location of the monitoring wells, and the frequency of sampling, all contributing to the uncertainty of early detection. Detection of contaminants, of course, is of value if remedial actions follow as soon as possible, so that the volume of contaminated groundwater to be treated is minimized. Practically, there is always a time lag between contaminant detection and remedial action response. Administrative decisions and arrangements with local contractors initiate remedial procedures introduces a time lag between detection and remediation time. During this time lag a plume continues to move into an aquifer contaminating larger groundwater volumes. In the present study these issues are addressed by investigating the case of instantaneous leakage from a landfill facility into a heterogeneous aquifer. The stochastic Monte Carlo framework was used to address, in two dimensions, the problem of evaluating the effectiveness of contaminant detection in heterogeneous aquifers by linear networks of monitoring wells. Numerical experiments based on the random-walk tracking-particle method were conducted to determine the detection probabilities and to calculate contaminated areas at different time steps. Several cases were studied assuming different levels of geologic heterogeneity, contamination dispersion, detectable contamination limits and monitoring wells' sampling frequencies. A new perspective is introduced for the correction of risk analyses; contemporary risk analyses consider the cost of alternative remediation procedures by assuming that the contamination area to be remediated coincides with the area calculated at the time of detection. However, there is always a considerable lag between the time that a plume is detected and the time when remediation commences. This time lag constitutes a random variable that depends on available resources and technologies, as well as efficiency of administration decision-making. An expression is proposed that accounts for the delay between detection and remedial action in order to provide a correction to decision analyses that evaluate the economic worth of well monitoring. This expression illustrates that delays over 3 years are equivalent to reducing the monitoring performance of 12 wells to that of a much lower number of wells, or equally, having to consider higher failure costs than those assumed in current risk analyses.

  3. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less

  4. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada,more » and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.« less

  5. Health Workforce Planning

    PubMed Central

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  6. Quick Reaction Report on DoD Procurements Through the Tennessee Valley Authority

    DTIC Science & Technology

    1992-04-03

    from non-DoD agencies that includes sections to be completed and signed by a contracting officer. Recommendations for Corrective Actions We recommend...in the DD 350 Individual Contract Action Reporting System. The Assistant Secretary did not provide planned dates for completing the corrective actions ...will be reprocured. Tentative milestones for completion of the corrective actions were not identified. Defense Logistics Agency comments. The Deputy

  7. Statistical Tools Applied in the Characterisation and Evaluation of a Thermo-Hygrometric Corrective Action Carried out at the Noheda Archaeological Site (Noheda, Spain)

    PubMed Central

    Valero, Miguel Ángel; Merello, Paloma; Navajas, Ángel Fernández; García-Diego, Fernando-Juan

    2014-01-01

    The Noheda archaeological site is unique and exceptional for its size, and the quality and conservation condition of the Roman mosaic pavement covering its urban pars. In 2008 a tent was installed as protection from rain and sun. Being of interest to characterise the microclimate of the remains, six probes with relative humidity and temperature sensors were installed in 2013 for this purpose. Microclimate monitoring allowed us to check relative humidity differences resulting from the groundwater level, as well as inner sensors reaching maximum temperatures higher than the outdoors ones as a consequence of the non-ventilated tent covering the archaeological site. Microclimatic conditions in the archaeological site were deemed detrimental for the conservation of the mosaics. Thus, in summer 2013, expanded clay and geotextile were installed over the mosaics as a corrective action. The outcomes of this study have proven the effectiveness of this solution to control temperature and relative humidity, helping to configure a more stable microclimate suitable for preservation of the mosaic. PMID:24445414

  8. Statistical tools applied in the characterisation and evaluation of a thermo-hygrometric corrective action carried out at the Noheda archaeological site (Noheda, Spain).

    PubMed

    Valero, Miguel Ángel; Merello, Paloma; Navajas, Ángel Fernández; García-Diego, Fernando-Juan

    2014-01-17

    The Noheda archaeological site is unique and exceptional for its size, and the quality and conservation condition of the Roman mosaic pavement covering its urban pars. In 2008 a tent was installed as protection from rain and sun. Being of interest to characterise the microclimate of the remains, six probes with relative humidity and temperature sensors were installed in 2013 for this purpose. Microclimate monitoring allowed us to check relative humidity differences resulting from the groundwater level, as well as inner sensors reaching maximum temperatures higher than the outdoors ones as a consequence of the non-ventilated tent covering the archaeological site. Microclimatic conditions in the archaeological site were deemed detrimental for the conservation of the mosaics. Thus, in summer 2013, expanded clay and geotextile were installed over the mosaics as a corrective action. The outcomes of this study have proven the effectiveness of this solution to control temperature and relative humidity, helping to configure a more stable microclimate suitable for preservation of the mosaic.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  10. Addendum to the Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  11. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  12. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Undrground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  13. Addendum to the Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  14. Addendum to the Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  15. Addendum to the Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  16. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  17. Addendum to the Closure Report for Corrective Action Unit 423: Area 3 Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  18. Addendum to the Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  19. Addendum to the Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  20. Addendum to the Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  1. 78 FR 23626 - Agency Information Collection Activities; Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ..., page 73114. Airworthiness Directives are regulations issued to require action to correct unsafe... emergency corrective action is taken to determine if the action was adequate to correct the unsafe condition... DePaepe at (405) 954-9362, or by email at: [email protected] . SUPPLEMENTARY INFORMATION: [[Page...

  2. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  3. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  4. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  5. 10 CFR 26.41 - Audits and corrective action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...

  6. 10 CFR 26.41 - Audits and corrective action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...

  7. 10 CFR 26.41 - Audits and corrective action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...

  8. 10 CFR 26.41 - Audits and corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...

  9. 10 CFR 26.41 - Audits and corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...

  10. Corrective Action Framework for the Office of Student Financial Assistance.

    ERIC Educational Resources Information Center

    Advanced Technology, Inc., Reston, VA.

    An ongoing corrective action framework for the Office of Student Financial Assistance (OSFA) is presented. Attention is directed to the formal management structure in OSFA and current initiatives to improve management, and the placement of the corrective action process in the organizational hierarchy. Four formal mechanisms needed to implement the…

  11. 77 FR 74024 - Sunshine Act Meetings; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ... INTER-AMERICAN FOUNDATION BOARD MEETING Sunshine Act Meetings; Correction AGENCY: Inter-American Foundation. ACTION: Correction. SUMMARY: This action corrects the order of the MATTERS TO BE CONSIDERED and... September 24, 2012, Meeting of the Board of Directors'' subsections. CONTACT PERSON FOR MORE INFORMATION...

  12. Corrective Action Plan for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. B. Jackson

    2003-05-01

    The Areas 25, 26 and 27 Septic Systems are in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 271. This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for CAU 271. CAU 271 is located on the Nevada Test Site (NTS) approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and consists of the following 15 Corrective Action Sites (CAS): CAS 25-04-1, Septic System; CAS 25-04-03, Septic System; CAS25-04-04, Septic System; CAS 25-04-08, Septic System; CAS 25-04-09, Septic System; CAS 25-04-10, Septic System; CAS 25-04-11, Septicmore » System; CAS 26-03-01, Contaminated Water Reservoir; CAS 26-04-1, Septic System; CAS 26-04-02, Septic System; CAS 26-05-01, Radioactive Leachfield; CAS-26-05-03, Septic System; CAS 26-05-04, Septic System; CAS 26-05-05, Septic System; and CAS 27-05-02, Leachfield.« less

  13. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 516: SEPTIC SYSTEMS AND DISCHARGE POINTS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2005-08-01

    Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6)more » 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).« less

  14. Distributed intelligent monitoring and reporting facilities

    NASA Astrophysics Data System (ADS)

    Pavlou, George; Mykoniatis, George; Sanchez-P, Jorge-A.

    1996-06-01

    Distributed intelligent monitoring and reporting facilities are of paramount importance in both service and network management as they provide the capability to monitor quality of service and utilization parameters and notify degradation so that corrective action can be taken. By intelligent, we refer to the capability of performing the monitoring tasks in a way that has the smallest possible impact on the managed network, facilitates the observation and summarization of information according to a number of criteria and in its most advanced form and permits the specification of these criteria dynamically to suit the particular policy in hand. In addition, intelligent monitoring facilities should minimize the design and implementation effort involved in such activities. The ISO/ITU Metric, Summarization and Performance management functions provide models that only partially satisfy the above requirements. This paper describes our extensions to the proposed models to support further capabilities, with the intention to eventually lead to fully dynamically defined monitoring policies. The concept of distributing intelligence is also discussed, including the consideration of security issues and the applicability of the model in ODP-based distributed processing environments.

  15. RCRA, superfund and EPCRA hotline training module. Introduction to: RCRA corrective action updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module discusses the regulatory and statutory requirements and authorities governing the Resource Conservation and Recovery Act (RCRA) corrective action process. There are minimal regulatory requirements at present, but the Agency has issued a proposed rule (55 FR 30798; July 27, 1990) that would establish a comprehensive regulatory framework for implementing the corrective action program. This proposed rule and other guidance developed pursuant to statutory authorities are used to structure corrective action requirements in facility permits and orders. This module describes the current statutory and regulatory structure and discusses the future of the proposed rule.

  16. Real-Time Monitoring of Vaccination Campaign Performance Using Mobile Phones - Nepal, 2016.

    PubMed

    Oh, David H; Dabbagh, Alya; Goodson, James L; Strebel, Peter M; Thapa, Sanjita; Giri, Jagat Narain; Shakya, Sagar Ratna; Khanal, Sudhir

    2016-10-07

    In 2012, the Global Vaccine Action Plan* established a goal to achieve measles and rubella elimination in five of the six World Health Organization (WHO) regions (194 countries) by 2020 (1). Measles elimination strategies aim to achieve ≥95% coverage with 2 routine doses of measles-containing vaccine (2), and implement supplementary immunization activities (SIAs) † in settings where routine coverage is low or where there are subpopulations at high risk. To ensure SIA quality and to achieve ≥95% SIA coverage nationally, rapid convenience monitoring (RCM) is used during or immediately after SIAs (3,4). The objective of RCM is to find unvaccinated children and to identify reasons for nonvaccination in areas with persons at high risk, to enable immediate implementation of corrective actions (e.g., reassigning teams to poorly vaccinated areas, modifying the timing of vaccination, or conducting mop-up vaccination activities). This report describes pilot testing of RCM using mobile phones (RCM-MP) during the second phase of an SIA in Nepal in 2016. Use of RCM-MP resulted in 87% timeliness and 94% completeness of data reporting and found that, although 95% of children were vaccinated, 42% of areas required corrective vaccination activities. RCM-MP challenges included connecting to mobile networks, small phone screen size, and capturing Global Positioning System (GPS) coordinates. Nonetheless, use of RCM-MP led to faster data transmission, analysis, and decision-making and to increased accountability among levels of the health system.

  17. Cleanups In My Community (CIMC) - Hazardous Waste Corrective Actions, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Hazardous Waste Corrective Action sites as part of the CIMC web service. Hazardous waste is waste that is dangerous or potentially harmful to our health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded commercial products, like cleaning fluids or pesticides, or the by-products of manufacturing processes. The RCRA Corrective Action Program, run by EPA and 43 authorized states and territories, works with facilities that have treated, stored, or disposed of hazardous wastes (TSDs) to protect public health and the environment by investigating and cleaning up hazardous releases to soil, ground water, surface water, and air at their facilities.RCRA Corrective Action sites in all 50 states and four U.S. territories cover 18 million acres of land.EPA estimates that more than 35 million people, roughly 12 percent of the U.S. population, live within one mile of a RCRA Corrective Action site (based on the 2000 U.S. Census).RCRA Corrective Action facilities include many current and former chemical manufacturing plants, oil refineries, lead smelters, wood preservers, steel mills, commercial landfills, and a variety of other types of entities. Due to poor practices prior to environmental regulations, Corrective Action facilities have left large stretches of river sediments laden with PCBs; deposited lead in residential yards and parks beyond site boundaries; polluted drinking water wells

  18. Improving nurses' knowledge of continuous ST-segment monitoring.

    PubMed

    Chronister, Connie

    2014-01-01

    Continuous ST-segment monitoring can result in detection of myocardial ischemia, but in clinical practice, continuous ST-segment monitoring is conducted incorrectly and underused by many registered nurses (RNs). Many RNs are unable to correctly institute ST-segment monitoring guidelines because of a lack of education. To evaluate whether an educational intervention, provided to 32 RNs, increases knowledge and correct clinical decision making (CDM) for the use of continuous ST-segment monitoring. At a single institution, an ST-segment monitoring class was provided to RNs in 2 cardiovascular units. Knowledge and correct CDM instruments were used for a baseline pretest and subsequent posttest after ST-segment monitoring education. Statistical significance between pretest and posttest scores for knowledge and correct CDM practice was noted with dependent t tests (P = .0001). Many RNs responsible for electrocardiographic monitoring are not aware of evidence-based ST-segment monitoring practice guidelines and cannot properly place precordial leads needed for ST-segment monitoring. Knowledge and correct CDM with ST-segment monitoring can be improved with focused education.

  19. Tokamak plasma current disruption infrared control system

    DOEpatents

    Kugel, Henry W.; Ulrickson, Michael

    1987-01-01

    In a magnetic plasma confinment device having an inner toroidal limiter mounted on an inner wall of a plasma containment vessel, an arrangement is provided for monitoring vertical temperature profiles of the limiter. The temperature profiles are taken at brief time intervals, in a time scan fashion. The time scans of the vertical temperature profile are continuously monitored to detect the presence of a peaked temperature excursion, which, according to the present invention, is a precursor of a subsequent major plasma disruption. A fast scan of the temperature profile is made so as to provide a time interval in real time prior to the major plasma disruption, such that corrective action can be taken to reduce the harmful effects of the plasma disruption.

  20. 36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...

  1. 36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...

  2. 36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...

  3. 36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...

  4. Failing Schools: A Study of Corrective Actions in Relation to Underperforming Elementary Schools in California

    ERIC Educational Resources Information Center

    Stewart, Francine A.

    2016-01-01

    The purpose of this study was to find out which corrective actions have a positive impact on improving students' learning and achievement and ultimately moving underperforming elementary schools out of Program Improvement (PI) status in California. Some common corrective actions include, but are not limited to, instructional program, instructional…

  5. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  6. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada, REVISION 0, march 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ITLV.

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less

  7. Corrective Action Investigation Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, July 2002, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located withinmore » Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues, herbicides, pesticides, polychlorinated biphenyls, metals, and radionuclides. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  8. Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. M. Fitzmaurice

    2001-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).« less

  9. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin J.; Boehlecke, Robert F.

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less

  10. A manual for addressing ineffectiveness within a Corrective Action System and driving on-time dispositions

    NASA Astrophysics Data System (ADS)

    Mallari, Lawrence Anthony Castro

    This project proposes a manual specifically for remedying an ineffective Corrective Action Request System for Company ABC by providing dispositions within the company's quality procedure. A Corrective Action Request System is a corrective action tool that provides a means for employees to engage in the process improvement, problem elimination cycle. At Company ABC, Corrective Action Recommendations (CARs) are not provided with timely dispositions; CARs are being ignored due to a lack of training and awareness of Company ABC's personnel and quality procedures. In this project, Company ABC's quality management software database is scrutinized to identify the number of delinquent, non-dispositioned CARs in 2014. These CARs are correlated with the number of nonconformances generated for the same issue while the CAR is still open. Using secondary data, the primary investigator finds that nonconformances are being remediated at the operational level. However, at the administrative level, CARS are being ignored and forgotten.

  11. 78 FR 63903 - Airworthiness Directives; the Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Airplanes AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM... corrective actions if necessary. This proposed AD also specifies an optional action of doing an inspection for corrosion damage of the bonding brackets, and corrective actions if necessary, which would...

  12. Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

    NASA Technical Reports Server (NTRS)

    2015-01-01

    This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

  13. Microclimate monitoring of Ariadne's house (Pompeii, Italy) for preventive conservation of fresco paintings.

    PubMed

    Merello, Paloma; García-Diego, Fernando-Juan; Zarzo, Manuel

    2012-11-28

    Ariadne's house, located at the city center of ancient Pompeii, is of great archaeological value due to the fresco paintings decorating several rooms. In order to assess the risks for long-term conservation affecting the valuable mural paintings, 26 temperature data-loggers and 26 relative humidity data-loggers were located in four rooms of the house for the monitoring of ambient conditions. Data recorded during 372 days were analyzed by means of graphical descriptive methods and analysis of variance (ANOVA). Results revealed an effect of the roof type and number of walls of the room. Excessive temperatures were observed during the summer in rooms covered with transparent roofs, and corrective actions were taken. Moreover, higher humidity values were recorded by sensors on the floor level. The present work provides guidelines about the type, number, calibration and position of thermohygrometric sensors recommended for the microclimate monitoring of mural paintings in outdoor or semi-confined environments.

  14. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  15. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  16. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  17. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  18. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  19. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  20. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  1. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  2. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  3. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  4. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  5. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  6. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  7. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  8. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  9. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  10. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  11. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  12. CSHM: Web-based safety and health monitoring system for construction management.

    PubMed

    Cheung, Sai On; Cheung, Kevin K W; Suen, Henry C H

    2004-01-01

    This paper describes a web-based system for monitoring and assessing construction safety and health performance, entitled the Construction Safety and Health Monitoring (CSHM) system. The design and development of CSHM is an integration of internet and database systems, with the intent to create a total automated safety and health management tool. A list of safety and health performance parameters was devised for the management of safety and health in construction. A conceptual framework of the four key components of CSHM is presented: (a) Web-based Interface (templates); (b) Knowledge Base; (c) Output Data; and (d) Benchmark Group. The combined effect of these components results in a system that enables speedy performance assessment of safety and health activities on construction sites. With the CSHM's built-in functions, important management decisions can theoretically be made and corrective actions can be taken before potential hazards turn into fatal or injurious occupational accidents. As such, the CSHM system will accelerate the monitoring and assessing of performance safety and health management tasks.

  13. 78 FR 28780 - Defense Federal Acquisition Regulation Supplement: Detection and Avoidance of Counterfeit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... clause at FAR 52.244-2, Subcontracts. (1) Unallowability of costs of rework and corrective action. A new... cost of rework or corrective action that may be required to remedy the use or inclusion of such parts... such products and for any rework or corrective action that may be required to remedy the use or...

  14. 36 CFR § 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What are the types of corrective action NARA imposes for prohibited behavior? § 1280.34 Section § 1280.34 Parks, Forests, and... of corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions...

  15. Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-07-01

    Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less

  16. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  17. Real time monitoring of powder blend bulk density for coupled feed-forward/feed-back control of a continuous direct compaction tablet manufacturing process.

    PubMed

    Singh, Ravendra; Román-Ospino, Andrés D; Romañach, Rodolfo J; Ierapetritou, Marianthi; Ramachandran, Rohit

    2015-11-10

    The pharmaceutical industry is strictly regulated, where precise and accurate control of the end product quality is necessary to ensure the effectiveness of the drug products. For such control, the process and raw materials variability ideally need to be fed-forward in real time into an automatic control system so that a proactive action can be taken before it can affect the end product quality. Variations in raw material properties (e.g., particle size), feeder hopper level, amount of lubrication, milling and blending action, applied shear in different processing stages can affect the blend density significantly and thereby tablet weight, hardness and dissolution. Therefore, real time monitoring of powder bulk density variability and its incorporation into the automatic control system so that its effect can be mitigated proactively and efficiently is highly desired. However, real time monitoring of powder bulk density is still a challenging task because of different level of complexities. In this work, powder bulk density which has a significant effect on the critical quality attributes (CQA's) has been monitored in real time in a pilot-plant facility, using a NIR sensor. The sensitivity of the powder bulk density on critical process parameters (CPP's) and CQA's has been analyzed and thereby feed-forward controller has been designed. The measured signal can be used for feed-forward control so that the corrective actions on the density variations can be taken before they can influence the product quality. The coupled feed-forward/feed-back control system demonstrates improved control performance and improvements in the final product quality in the presence of process and raw material variations. Copyright © 2015 Elsevier B.V. All rights reserved.

  18. 77 FR 4392 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ..., no. 225, page 72237. Airworthiness Directives are regulations issued to require correct corrective... inspections are often needed when emergency corrective action is taken to determine if the action was adequate...

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Strand

    2006-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. A Tier 2 evaluation was conducted, and a FAL of 185,000 micrograms per kilogram was calculated for chlordane at CASs 16-04-01, 16-04-02, and 16-04-03 based on an occasional use area exposure scenario. This evaluation of chlordane based on the Tier 2 FAL determined that no FALs were exceeded. Therefore, the DQO data needs were met, and it was determined that no corrective action (based on risk to human receptors) is necessary for the site. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) The surface soil surrounding the main concrete pad at CAS 23-20-01 contained Aroclor-1254, Aroclor-1260, and chlordane above the FALs. This soil, along with the COCs, was subsequently removed at CAS 23-20-01. (2) The sludge in the concrete box of the catch basin at the large concrete pad at CAS 23-20-01 contained lead and benzo(a)pyrene above the FALs. This contamination was limited to the sludge in the concrete box of the catch basin and did not migrate to the subsurface features beneath it. The contaminated and the concrete box of the catch basin were subsequently recovered at CAS 23-20-01.« less

  20. Corrective Action Decision Document for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-05-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks contain trichloroethane and 1,4-dichlorobenzene above ''Resource Conservation and Recovery Act'' toxicity characteristic limits. Based on the evaluation of analytical data from the CAI, review of future and current operations at the eight CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 151. No Further Action is the recommended corrective action for soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 18-03-01, and 18-99-09; and Lagoons C, D, F, and G of CAS 12-03-01. No Further Action with implementation of a best management practice (BMP) is recommended for soils at CAS 12-47-01 and Lagoons B and E of CAS 12-03-01. To be protective of future workers should the present scenario used to calculate FALs change, an administrative use restriction will be recorded per the FFACO agreement as a BMP. Close in Place with Administrative Controls is the recommended corrective action for Lagoon A of CAS 12-03-01. Based on the evaluation of analytical data from the CAI; review of future and current operations at CASs 12-04-01, 12-04-02, and 12-04-03; and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for the septic tanks at these CASs. No Further Action with implementation of BMPs is the recommended corrective action for septic tanks that do not contain potential source material from CAS 12-04-01, System No.4 (four tanks); CAS 12-04-02, System No.5 (six tanks); and CAS 12-04-03, System No.3 (four tanks). Clean Closure with implementation of BMPs is the recommended corrective action for the septic tanks from CAS 12-04-01, System No.1 (two tanks). The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 151.« less

  1. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  2. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... 16, 2006 Monitoring § 60.2940 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  3. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  4. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... 16, 2006 Monitoring § 60.2940 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  5. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  6. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  7. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  8. Develop a Prototype Personal Health Record Application (PHR-A) that Captures Information About Daily Living Important for Diabetes and Provides Decision Support with Actionable Advice for Diabetes Self Care

    DTIC Science & Technology

    2013-10-01

    diabetes self-management: 1) nutrition/ diet (healthy eating) 2) physical activity (being active); 3) blood glucose (self-monitoring); 4) medications...correctly interpret random blood glucose readings, take medications as prescribed, follow a balanced, whole foods-based diet and engage in regular...What if I ate…” analysis). The Healthy Eating Module’s focus is eating a balanced diet of the right food groups (not about calorie and/or carbohydrate

  9. 76 FR 72237 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... correct corrective action to correct unsafe conditions in aircraft, engines, propellers, and appliances... action was adequate to correct the unsafe condition. The respondents are aircraft owners and operators... when an unsafe condition is discovered on a specific aircraft type. If the condition is serious enough...

  10. 77 FR 73114 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... correct corrective action to correct unsafe conditions in aircraft, engines, propellers, and appliances... action was adequate to correct the unsafe condition. The respondents are aircraft owners and operators... when an unsafe condition is discovered on a specific aircraft type. If the condition is serious enough...

  11. 49 CFR 385.323 - May FMCSA extend the period under § 385.319(c) for a new entrant to take corrective action to...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) for a new entrant to take corrective action to remedy its safety management practices? 385.323 Section....319(c) for a new entrant to take corrective action to remedy its safety management practices? (a... determines the new entrant is making a good faith effort to remedy its safety management practices. (b) FMCSA...

  12. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  13. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  14. 21 CFR 820.100 - Corrective and preventive action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., work operations, concessions, quality audit reports, quality records, service records, complaints, returned product, and other sources of quality data to identify existing and potential causes of... (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Corrective and Preventive Action § 820.100 Corrective...

  15. 21 CFR 820.100 - Corrective and preventive action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., work operations, concessions, quality audit reports, quality records, service records, complaints, returned product, and other sources of quality data to identify existing and potential causes of... (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Corrective and Preventive Action § 820.100 Corrective...

  16. 21 CFR 820.100 - Corrective and preventive action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., work operations, concessions, quality audit reports, quality records, service records, complaints, returned product, and other sources of quality data to identify existing and potential causes of... (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Corrective and Preventive Action § 820.100 Corrective...

  17. 21 CFR 820.100 - Corrective and preventive action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., work operations, concessions, quality audit reports, quality records, service records, complaints, returned product, and other sources of quality data to identify existing and potential causes of... (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Corrective and Preventive Action § 820.100 Corrective...

  18. 21 CFR 820.100 - Corrective and preventive action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., work operations, concessions, quality audit reports, quality records, service records, complaints, returned product, and other sources of quality data to identify existing and potential causes of... (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Corrective and Preventive Action § 820.100 Corrective...

  19. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less

  20. Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup whichmore » occurred after test activities.« less

  1. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  2. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false State corrective action plan. 275.17 Section 275.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... be taken, the expected outcome of each action, the target date for each action, and the date by which...

  3. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false State corrective action plan. 275.17 Section 275.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... be taken, the expected outcome of each action, the target date for each action, and the date by which...

  4. Embodying Others in Immersive Virtual Reality: Electro-Cortical Signatures of Monitoring the Errors in the Actions of an Avatar Seen from a First-Person Perspective.

    PubMed

    Pavone, Enea Francesco; Tieri, Gaetano; Rizza, Giulia; Tidoni, Emmanuele; Grisoni, Luigi; Aglioti, Salvatore Maria

    2016-01-13

    Brain monitoring of errors in one's own and other's actions is crucial for a variety of processes, ranging from the fine-tuning of motor skill learning to important social functions, such as reading out and anticipating the intentions of others. Here, we combined immersive virtual reality and EEG recording to explore whether embodying the errors of an avatar by seeing it from a first-person perspective may activate the error monitoring system in the brain of an onlooker. We asked healthy participants to observe, from a first- or third-person perspective, an avatar performing a correct or an incorrect reach-to-grasp movement toward one of two virtual mugs placed on a table. At the end of each trial, participants reported verbally how much they embodied the avatar's arm. Ratings were maximal in first-person perspective, indicating that immersive virtual reality can be a powerful tool to induce embodiment of an artificial agent, even through mere visual perception and in the absence of any cross-modal boosting. Observation of erroneous grasping from a first-person perspective enhanced error-related negativity and medial-frontal theta power in the trials where human onlookers embodied the virtual character, hinting at the tight link between early, automatic coding of error detection and sense of embodiment. Error positivity was similar in 1PP and 3PP, suggesting that conscious coding of errors is similar for self and other. Thus, embodiment plays an important role in activating specific components of the action monitoring system when others' errors are coded as if they are one's own errors. Detecting errors in other's actions is crucial for social functions, such as reading out and anticipating the intentions of others. Using immersive virtual reality and EEG recording, we explored how the brain of an onlooker reacted to the errors of an avatar seen from a first-person perspective. We found that mere observation of erroneous actions enhances electrocortical markers of error detection in the trials where human onlookers embodied the virtual character. Thus, the cerebral system for action monitoring is maximally activated when others' errors are coded as if they are one's own errors. The results have important implications for understanding how the brain can control the external world and thus creating new brain-computer interfaces. Copyright © 2016 the authors 0270-6474/16/360268-12$15.00/0.

  5. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    PubMed Central

    Hadjichristodoulou, Christos; Mouchtouri, Varvara; Vaitsi, Vasiliki; Kapoula, Christina; Vousoureli, Anastasia; Kalivitis, Isidiros; Chervoni, Julia; Papastergiou, Panagiotis; Vasilogiannakopoulos, Antonios; Daniilidis, Vasilis D; Kremastinou, Jenny

    2006-01-01

    Background Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. Methods The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc) of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Results Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p < 0.0001) and positive water quality tests (r = 0.39, p < 0.001) presented an overall decrease trend over time. In August, 2003, an outbreak of salmonellosis was linked to a hotel restaurant which accommodated athletes during a test event. Conclusion Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective. PMID:17176469

  6. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    PubMed

    Hadjichristodoulou, Christos; Mouchtouri, Varvara; Vaitsi, Vasiliki; Kapoula, Christina; Vousoureli, Anastasia; Kalivitis, Isidiros; Chervoni, Julia; Papastergiou, Panagiotis; Vasilogiannakopoulos, Antonios; Daniilidis, Vasilis D; Kremastinou, Jenny

    2006-12-18

    Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc) of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p < 0.0001) and positive water quality tests (r = 0.39, p < 0.001) presented an overall decrease trend over time. In August, 2003, an outbreak of salmonellosis was linked to a hotel restaurant which accommodated athletes during a test event. Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective.

  7. Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Murphy, Alex

    2016-01-01

    This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

  8. 49 CFR 385.325 - What happens after a new entrant has been notified under § 385.319(c) to take corrective action...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under § 385.319(c) to take corrective action to remedy its safety management practices? 385.325 Section... been notified under § 385.319(c) to take corrective action to remedy its safety management practices... not be revoked and it may continue operations. (b) If a new entrant, after being notified that it is...

  9. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less

  10. Addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  11. Addendum to the Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  12. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada, REVISION 0, march 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    1999-03-26

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform video surveys of the discharge and outfall lines. (2) Collect samples of material in the septic tanks. (3) Conduct exploratory trenching to locate and inspect subsurface components. (4) Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. (5) Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. (6) Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. (7) Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. (10) Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. (11) Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less

  13. The application of hazard analysis and critical control points and risk management in the preparation of anti-cancer drugs.

    PubMed

    Bonan, Brigitte; Martelli, Nicolas; Berhoune, Malik; Maestroni, Marie-Laure; Havard, Laurent; Prognon, Patrice

    2009-02-01

    To apply the Hazard analysis and Critical Control Points method to the preparation of anti-cancer drugs. To identify critical control points in our cancer chemotherapy process and to propose control measures and corrective actions to manage these processes. The Hazard Analysis and Critical Control Points application began in January 2004 in our centralized chemotherapy compounding unit. From October 2004 to August 2005, monitoring of the process nonconformities was performed to assess the method. According to the Hazard Analysis and Critical Control Points method, a multidisciplinary team was formed to describe and assess the cancer chemotherapy process. This team listed all of the critical points and calculated their risk indexes according to their frequency of occurrence, their severity and their detectability. The team defined monitoring, control measures and corrective actions for each identified risk. Finally, over a 10-month period, pharmacists reported each non-conformity of the process in a follow-up document. Our team described 11 steps in the cancer chemotherapy process. The team identified 39 critical control points, including 11 of higher importance with a high-risk index. Over 10 months, 16,647 preparations were performed; 1225 nonconformities were reported during this same period. The Hazard Analysis and Critical Control Points method is relevant when it is used to target a specific process such as the preparation of anti-cancer drugs. This method helped us to focus on the production steps, which can have a critical influence on product quality, and led us to improve our process.

  14. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  15. Comparison of the effect of rocuronium dosing based on corrected or lean body weight on rapid sequence induction and neuromuscular blockade duration in obese female patients

    PubMed Central

    Sakızcı-Uyar, Bahar; Çelik, Şeref; Postacı, Aysun; Bayraktar, Yeşim; Dikmen, Bayazit; Özkoçak-Turan, Işıl; Saçan, Özlem

    2016-01-01

    Objectives: To compare onset time, duration of action, and tracheal intubation conditions in obese patients when the intubation dose of rocuronium was based on corrected body weight (CBW) versus lean body weight (LBW) for rapid sequence induction. Methods: This prospective study was carried out at Numune Education and Research Hospital, Ankara, Turkey between August 2013 and May 2014. Forty female obese patients scheduled for laparoscopic surgery under general anesthesia were randomized into 2 groups. Group CBW (n=20) received 1.2 mg/kg rocuronium based on CBW, and group LBW (n=20) received 1.2 mg/kg rocuronium based on LBW. Endotracheal intubation was performed 60 seconds after injection of muscle relaxant, and intubating conditions were evaluated. Neuromuscular transmission was monitored using acceleromyography of the adductor pollicis. Onset time, defined as time to depression of the twitch tension to 95% of its control value, and duration of action, defined as time to achieve one response to train-of-four stimulation (T1) were recorded. Results: No significant differences were observed between the groups in intubation conditions or onset time (50-60 seconds median, 30-30 interquartile range [IQR]). Duration of action was significantly longer in the CBW group (60 minutes median, 12 IQR) than the LBW group (35 minutes median, 16 IQR; p<0.01). Conclusion: In obese patients, dosing of 1.2 mg/kg rocuronium based on LBW provides excellent or good tracheal intubating conditions within 60 seconds after administration and does not lead to prolonged duration of action. PMID:26739976

  16. Effects of two types of intra-team feedback on developing a shared mental model in Command & Control teams.

    PubMed

    Rasker, P C; Post, W M; Schraagen, J M

    2000-08-01

    In two studies, the effect of two types of intra-team feedback on developing a shared mental model in Command & Control teams was investigated. A distinction is made between performance monitoring and team self-correction. Performance monitoring is the ability of team members to monitor each other's task execution and give feedback during task execution. Team self-correction is the process in which team members engage in evaluating their performance and in determining their strategies after task execution. In two experiments the opportunity to engage in performance monitoring, respectively team self-correction, was varied systematically. Both performance monitoring as well as team self-correction appeared beneficial in the improvement of team performance. Teams that had the opportunity to engage in performance monitoring, however, performed better than teams that had the opportunity to engage in team self-correction.

  17. Efficient color correction method for smartphone camera-based health monitoring application.

    PubMed

    Duc Dang; Chae Ho Cho; Daeik Kim; Oh Seok Kwon; Jo Woon Chong

    2017-07-01

    Smartphone health monitoring applications are recently highlighted due to the rapid development of hardware and software performance of smartphones. However, color characteristics of images captured by different smartphone models are dissimilar each other and this difference may give non-identical health monitoring results when the smartphone health monitoring applications monitor physiological information using their embedded smartphone cameras. In this paper, we investigate the differences in color properties of the captured images from different smartphone models and apply a color correction method to adjust dissimilar color values obtained from different smartphone cameras. Experimental results show that the color corrected images using the correction method provide much smaller color intensity errors compared to the images without correction. These results can be applied to enhance the consistency of smartphone camera-based health monitoring applications by reducing color intensity errors among the images obtained from different smartphones.

  18. 77 FR 59728 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... correct installation of certain bonding straps, and applicable corrective actions. This new AD adds... the potential of ignition sources inside fuel tanks in the event of a severe lightning strike, which... installation of certain bonding straps, and applicable corrective actions. That NPRM also proposed to add...

  19. 7 CFR 225.11 - Corrective action procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Corrective action procedures. 225.11 Section 225.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.11 Corrective...

  20. 7 CFR 225.11 - Corrective action procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Corrective action procedures. 225.11 Section 225.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.11 Corrective...

  1. 7 CFR 225.11 - Corrective action procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Corrective action procedures. 225.11 Section 225.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.11 Corrective...

  2. 20 CFR 633.315 - Replacement, corrective action, termination.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...

  3. 20 CFR 633.315 - Replacement, corrective action, termination.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...

  4. Building false memories without suggestions.

    PubMed

    Foster, Jeffrey L; Garry, Maryanne

    2012-01-01

    People can come to remember doing things they have never done. The question we asked in this study is whether people can systematically come to remember performing actions they never really did, in the absence of any suggestion from the experimenter. People built LEGO vehicles, performing some steps but not others. For half the people, all the pieces needed to assemble each vehicle were laid out in order in front of them while they did the building; for the other half, the pieces were hidden from view. The next day, everyone returned for a surprise recognition test. People falsely and confidently remembered having carried out steps they did not; those who saw all the pieces while they built each vehicle were more likely to correctly remember performing steps they did perform but equally likely to falsely remember performing steps they did not. We explain our results using the source monitoring framework: People used the relationships between actions to internally generate the missing, related actions, later mistaking that information for genuine experience.

  5. Corrective Action Investigation Plan for Corrective Action Unit 165: Areas 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (including Record of Technical Change Nos. 1, 2, and 3) (January 2002, Rev. 0)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 165 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 165 consists of eight Corrective Action Sites (CASs): CAS 25-20-01, Lab Drain Dry Well; CAS 25-51-02, Dry Well; CAS 25-59-01, Septic System; CAS 26-59-01, Septic System; CAS 25-07-06, Train Decontamination Area; CAS 25-07-07, Vehicle Washdown; CAS 26-07-01, Vehicle Washdown Station; and CAS 25-47-01, Reservoir and French Drain. All eight CASsmore » are located in the Nevada Test Site, Nevada. Six of these CASs are located in Area 25 facilities and two CASs are located in Area 26 facilities. The eight CASs at CAU 165 consist of dry wells, septic systems, decontamination pads, and a reservoir. The six CASs in Area 25 are associated with the Nuclear Rocket Development Station that operated from 1958 to 1973. The two CASs in Area 26 are associated with facilities constructed for Project Pluto, a series of nuclear reactor tests conducted between 1961 to 1964 to develop a nuclear-powered ramjet engine. Based on site history, the scope of this plan will be a two-phased approach to investigate the possible presence of hazardous and/or radioactive constituents at concentrations that could potentially pose a threat to human health and the environment. The Phase I analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. If laboratory data obtained from the Phase I investigation indicates the presence of contaminants of concern, the process will continue with a Phase II investigation to define the extent of contamination. Based on the results of Phase I sampling, the analytical program for Phase II investigation may be reduced. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  6. Corrective Action Investigation Plan for Corrective Action Unit 405: Area 3 Septic Systems, Tonopah Test Range, Nevada(April 2001, Rev. 0) with Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    2001-04-26

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 405, Area 3 Septic Systems, Tonopah Test Range (TTR), under the Federal Facility Agreement and Consent Order. Corrective Action Unit 405 consists of Corrective Action Sites 03-05-002-SW03, 03-05-002-SW04, and 03-05-002-SW07 (also collectively known as: Septic Waste Systems [SWSs] 3, 4, and 7). Located in Area 3 in the northwest section of the TTR, approximately 140 miles northwest of Las Vegas, this location was historically (betweenmore » 1960 and 1990) used as a research facility with the mission to perform defense-related projects, and whose operations generated sanitary and industrial wastewaters potentially contaminated with COPCs and disposed of in septic tanks and leachfields. Though Septic Waste Systems 3, 4, and 7 were origin ally constructed to receive sanitary sewage, they may have inadvertently received effluent containing potentially hazardous and radiological constituents containing acetone, benzene, ethylbenzene, 4-methyl-2-pentanone, toluene, xylenes, volatile organic compound constituents, phenols, arsenic, barium, lead, mercury, hydrocarbons of oil and grease, and uranium-234, -235, and -238. The Area 3 septic systems were documented in a DOE/NV 1996 report as being included in the septic tank abandonment program conducted by Sandia National Laboratories in 1993; however, this program was not completed and the possibility exists that some of the Area 3 septic tanks may not have been abandoned. Even though all of the SWSs addressed in this CAIP are inactive, geophysical surveys conducted in 1993 were generally inconclusive and did not provide useful data for the purposes of this investigation. The scope of this current investigation, therefore, will be to determine the existence of the identified CO PCs and excavation will be the primary investigation method employed for these leachfield systems, but this effort may be limited by existing facilities and utilities. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the subsequent corrective action decision document.« less

  7. Agency attribution: event-related potentials and outcome monitoring.

    PubMed

    Bednark, Jeffery G; Franz, Elizabeth A

    2014-04-01

    Knowledge about the effects of our actions is an underlying feature of voluntary behavior. Given the importance of identifying the outcomes of our actions, it has been proposed that the sensory outcomes of self-made actions are inherently different from those of externally caused outcomes. Thus, the outcomes of self-made actions are likely to be more motivationally significant for an agent. We used event-related potentials to investigate the relationship between the perceived motivational significance of an outcome and the attribution of agency in the presence of others. In our experiment, we assessed agency attribution in the presence of another agent by varying the degree of contiguity between participants' self-made actions and the sensory outcome. Specifically, we assessed the feedback correct-related positivity (fCRP) and the novelty P3 measures of an outcome's motivational significance and unexpectedness, respectively. Results revealed that both the fCRP and participants' agency attributions were significantly influenced by action-outcome contiguity. However, when action-outcome contiguity was ambiguous, novelty P3 amplitude was a reliable indicator of agency attribution. Prior agency attributions were also found to influence attribution in trials with ambiguous and low action-outcome contiguity. Participants' use of multiple cues to determine agency is consistent with the cue integration theory of agency. In addition to these novel findings, this study supports growing evidence suggesting that reinforcement processes play a significant role in the sense of agency.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less

  9. 40 CFR 146.64 - Corrective action for wells in the area of review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requiring corrective action other than pressure limitations shall include a compliance schedule requiring... require observance of appropriate pressure limitations under paragraph (d)(3) until all other corrective... have been taken. (3) The Director may require pressure limitations in lieu of plugging. If pressure...

  10. 21 CFR 120.10 - Corrective actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 2 2013-04-01 2013-04-01 false Corrective actions. 120.10 Section 120.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS General Provisions § 120.10 Corrective...

  11. 21 CFR 120.10 - Corrective actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 2 2011-04-01 2011-04-01 false Corrective actions. 120.10 Section 120.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS General Provisions § 120.10 Corrective...

  12. 21 CFR 120.10 - Corrective actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 2 2012-04-01 2012-04-01 false Corrective actions. 120.10 Section 120.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS General Provisions § 120.10 Corrective...

  13. 21 CFR 120.10 - Corrective actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 2 2014-04-01 2014-04-01 false Corrective actions. 120.10 Section 120.10 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS General Provisions § 120.10 Corrective...

  14. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27more » (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.« less

  15. 40 CFR 146.7 - Corrective action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INJECTION CONTROL PROGRAM: CRITERIA AND STANDARDS General Provisions § 146.7 Corrective action. In...; (b) Nature of native fluids or by-products of injection; (c) Potentially affected population; (d...

  16. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less

  17. Corrective action investigation plan for Corrective Action Unit Number 423: Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-10-27

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at Corrective Action Unit (CAU) Number 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (140 miles) northwest of Las Vegas, Nevada. CAU Number 423 is comprised of only one Corrective Action Site (CAS) which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (240more » feet) northwest. The UDP was used between approximately 1965 and 1990 to dispose of waste fluids from the Building 03-60 automotive maintenance shop. It is likely that soils surrounding the UDP have been impacted by oil, grease, cleaning supplies and solvents as well as waste motor oil and other automotive fluids released from the UDP.« less

  18. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  19. Teaching Early Readers to Self-Monitor and Self-Correct

    ERIC Educational Resources Information Center

    Pratt, Sharon M.; Urbanowski, Melena

    2016-01-01

    Proficient readers self-monitor and self-correct to derive meaning from text. This article reviews research on how students learn to self-monitor and self-correct and describes a Reciprocal Teaching (RT) instructional routine that was successfully used with early readers to build their metacognitive processes. The RT routine included teacher…

  20. Corrective Action Investigation Plan for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, Revision 0 (includes ROTCs 1, 2, and 3)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL,more » Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium, beryllium, total petroleum hydrocarbons; and total Resource Conservation and Recovery Act metals. Field activities will consist of geophysical and radiological surveys, and collecting soil samples at biased locations by appropriate methods. A two-step data quality objective strategy will be followed: (1) define the nature of contamination at each CAS location by identifying any contamination above preliminary action levels (PALs); and, (2) determine the extent of contamination identified above PALs. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  1. 21 CFR 99.401 - Corrective actions and cessation of dissemination of information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HEALTH AND HUMAN SERVICES GENERAL DISSEMINATION OF INFORMATION ON UNAPPROVED/NEW USES FOR MARKETED DRUGS... cessation of dissemination of information. (a) FDA actions based on post dissemination data. If FDA receives... requirements; or (2) Order the manufacturer to cease dissemination of information and to take corrective action...

  2. 24 CFR 3282.416 - Supervision of notification and correction actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Supervision of notification and correction actions. 3282.416 Section 3282.416 Housing and Urban Development Regulations Relating to Housing... REGULATIONS Consumer Complaint Handling and Remedial Actions § 3282.416 Supervision of notification and...

  3. 42 CFR 431.836 - Corrective action under the MQC claims processing assessment system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... assessment system. 431.836 Section 431.836 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT... ADMINISTRATION Quality Control Medicaid Quality Control (mqc) Claims Processing Assessment System § 431.836 Corrective action under the MQC claims processing assessment system. The agency must— (a) Take action to...

  4. 78 FR 16401 - Institutional Review Boards; Correcting Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Administration, HHS. ACTION: Final rule; correcting amendments. SUMMARY: The Food and Drug Administration (FDA... the regulatory text and to update contact information. This action is editorial in nature and is... action under the Administrative Procedures Act (5 U.S.C. 553). FDA has determined that notice and public...

  5. 78 FR 11903 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for public comment... ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities.'' The draft NUREG provides guidance to... a fuel cycle facility is acceptable. DATES: Comments may be submitted by April 22, 2013. Comments...

  6. Toward Automated International Law Compliance Monitoring (TAILCM)

    DTIC Science & Technology

    2014-07-01

    5b. GRANT NUMBER N /A 5c. PROGRAM ELEMENT NUMBER Other (SAF) 6. AUTHOR(S) Leora Morgenstern 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...0.7 0.8 0.9 1 Regulation Type Action Agent Patient Condition Exception Pr ec is io n Category Corrected and Uncorrected Precision for Each Category...89 .82 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pr ec is io n Category Precision of Each Category for Each Adjudicator A1 A2 A3 Approved for

  7. View of Mission Control Center during the Apollo 13 oxygen cell failure

    NASA Image and Video Library

    1970-04-14

    S70-34904 (14 April 1970) --- Astronaut Alan B. Shepard Jr., prime crew commander of the Apollo 14 mission, monitors communications between the Apollo 13 spacecraft and Mission Control Center. He is seated at a console in the Mission Operations Control Room of the MCC, Manned Spacecraft Center. The main concern of the moment was action taken by the three Apollo 13 crewmen - astronauts James A. Lovell Jr., John L. Swigert Jr. and Fred W. Haise Jr. - to make corrections inside the spacecraft following discovery of an oxygen cell failure several hours earlier.

  8. 4 CFR 28.130 - General authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Corrective Action, Disciplinary and Stay Proceedings § 28.130 General authority. The procedures in this subpart relate to the Board's functions “to consider, decide and order corrective or disciplinary action...

  9. 40 CFR 280.42 - Requirements for hazardous substance UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND... effective corrective action technologies, health risks, and chemical and physical properties of the stored...

  10. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  11. Impaired action self-monitoring and cognitive confidence among ultra-high risk for psychosis and first-episode psychosis patients.

    PubMed

    Gawęda, Ł; Li, E; Lavoie, S; Whitford, T J; Moritz, S; Nelson, B

    2018-01-01

    Self-monitoring biases and overconfidence in incorrect judgments have been suggested as playing a role in schizophrenia spectrum disorders. Little is known about whether self-monitoring biases may contribute to early risk factors for psychosis. In this study, action self-monitoring (i.e., discrimination between imagined and performed actions) was investigated, along with confidence in judgments among ultra-high risk (UHR) for psychosis individuals and first-episode psychosis (FEP) patients. Thirty-six UHR for psychosis individuals, 25 FEP patients and 33 healthy controls (CON) participated in the study. Participants were assessed with the Action memory task. Simple actions were presented to participants verbally or non-verbally. Some actions were required to be physically performed and others were imagined. Participants were asked whether the action was presented verbally or non-verbally (action presentation type discrimination), and whether the action was performed or imagined (self-monitoring). Confidence self-ratings related to self-monitoring responses were obtained. The analysis of self-monitoring revealed that both UHR and FEP groups misattributed imagined actions as being performed (i.e., self-monitoring errors) significantly more often than the CON group. There were no differences regarding performed actions as being imagined. UHR and FEP groups made their false responses with higher confidence in their judgments than the CON group. There were no group differences regarding discrimination between the types of actions presented (verbal vs non-verbal). A specific type of self-monitoring bias (i.e., misattributing imagined actions with performed actions), accompanied by high confidence in this judgment, may be a risk factor for the subsequent development of a psychotic disorder. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  12. 21 CFR 123.7 - Corrective actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of their HACCP plans in accordance with § 123.6(c)(5), by which they predetermine the corrective... in accordance with § 123.10, to determine whether the HACCP plan needs to be modified to reduce the risk of recurrence of the deviation, and modify the HACCP plan as necessary. (d) All corrective actions...

  13. Microclimate monitoring of Ariadne’s house (Pompeii, Italy) for preventive conservation of fresco paintings

    PubMed Central

    2012-01-01

    Background Ariadne’s house, located at the city center of ancient Pompeii, is of great archaeological value due to the fresco paintings decorating several rooms. In order to assess the risks for long-term conservation affecting the valuable mural paintings, 26 temperature data-loggers and 26 relative humidity data-loggers were located in four rooms of the house for the monitoring of ambient conditions. Results Data recorded during 372 days were analyzed by means of graphical descriptive methods and analysis of variance (ANOVA). Results revealed an effect of the roof type and number of walls of the room. Excessive temperatures were observed during the summer in rooms covered with transparent roofs, and corrective actions were taken. Moreover, higher humidity values were recorded by sensors on the floor level. Conclusions The present work provides guidelines about the type, number, calibration and position of thermohygrometric sensors recommended for the microclimate monitoring of mural paintings in outdoor or semi-confined environments. PMID:23190798

  14. Formal Verification of the Runway Safety Monitor

    NASA Technical Reports Server (NTRS)

    Siminiceanu, Radu; Ciardo, Gianfranco

    2006-01-01

    The Runway Safety Monitor (RSM) designed by Lockheed Martin is part of NASA's effort to reduce runway accidents. We developed a Petri net model of the RSM protocol and used the model checking functions of our tool SMART to investigate a number of safety properties in RSM. To mitigate the impact of state-space explosion, we built a highly discretized model of the system, obtained by partitioning the monitored runway zone into a grid of smaller volumes and by considering scenarios involving only two aircraft. The model also assumes that there are no communication failures, such as bad input from radar or lack of incoming data, thus it relies on a consistent view of reality by all participants. In spite of these simplifications, we were able to expose potential problems in the RSM conceptual design. Our findings were forwarded to the design engineers, who undertook corrective action. Additionally, the results stress the efficiency attained by the new model checking algorithms implemented in SMART, and demonstrate their applicability to real-world systems.

  15. 40 CFR 63.2998 - What records must I maintain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Records of maintenance and inspections performed on the control devices. (e) If an operating parameter... which corrective actions were initiated and completed; (4) A brief description of the corrective actions...

  16. 7 CFR 248.17 - Management evaluations and reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... deficiencies and prevent their future recurrence. (iii) If the corrective action plan is acceptable, FNS will... plan, and whether the deficiency is resolved or further corrective action is needed. Compliance buys...

  17. The commercial use of satellite data to monitor the potato crop in the Columbia Basin

    NASA Technical Reports Server (NTRS)

    Waddington, George R., Jr.; Lamb, Frank G.

    1990-01-01

    The imaging of potato crops with satellites is described and evaluated in terms of the commercial application of the remotely sensed data. The identification and analysis of the crops is accomplished with multiple images acquired from the Landsat MSS and TM systems. The data are processed on a PC with image-procesing software which produces images of the seven 1024 x 1024 pixel windows which are subdivided into 21 512 x 512 pixel windows. Maximization of imaged data throughout the year aids in the identification of crop types by IR reflectance. The classification techniques involve the use of six or seven spectral classes for particular image dates. Comparisons with ground-truth data show good agreement; for example, potato fields are identified correctly 90 percent of the time. Acreage estimates and crop-condition assessments can be made from satellite data and used for corrective agricultural action.

  18. Ambient intelligence application based on environmental measurements performed with an assistant mobile robot.

    PubMed

    Martinez, Dani; Teixidó, Mercè; Font, Davinia; Moreno, Javier; Tresanchez, Marcel; Marco, Santiago; Palacín, Jordi

    2014-03-27

    This paper proposes the use of an autonomous assistant mobile robot in order to monitor the environmental conditions of a large indoor area and develop an ambient intelligence application. The mobile robot uses single high performance embedded sensors in order to collect and geo-reference environmental information such as ambient temperature, air velocity and orientation and gas concentration. The data collected with the assistant mobile robot is analyzed in order to detect unusual measurements or discrepancies and develop focused corrective ambient actions. This paper shows an example of the measurements performed in a research facility which have enabled the detection and location of an uncomfortable temperature profile inside an office of the research facility. The ambient intelligent application has been developed by performing some localized ambient measurements that have been analyzed in order to propose some ambient actuations to correct the uncomfortable temperature profile.

  19. Ambient Intelligence Application Based on Environmental Measurements Performed with an Assistant Mobile Robot

    PubMed Central

    Martinez, Dani; Teixidó, Mercè; Font, Davinia; Moreno, Javier; Tresanchez, Marcel; Marco, Santiago; Palacín, Jordi

    2014-01-01

    This paper proposes the use of an autonomous assistant mobile robot in order to monitor the environmental conditions of a large indoor area and develop an ambient intelligence application. The mobile robot uses single high performance embedded sensors in order to collect and geo-reference environmental information such as ambient temperature, air velocity and orientation and gas concentration. The data collected with the assistant mobile robot is analyzed in order to detect unusual measurements or discrepancies and develop focused corrective ambient actions. This paper shows an example of the measurements performed in a research facility which have enabled the detection and location of an uncomfortable temperature profile inside an office of the research facility. The ambient intelligent application has been developed by performing some localized ambient measurements that have been analyzed in order to propose some ambient actuations to correct the uncomfortable temperature profile. PMID:24681671

  20. An emerging network storage management standard: Media error monitoring and reporting information (MEMRI) - to determine optical tape data integrity

    NASA Technical Reports Server (NTRS)

    Podio, Fernando; Vollrath, William; Williams, Joel; Kobler, Ben; Crouse, Don

    1998-01-01

    Sophisticated network storage management applications are rapidly evolving to satisfy a market demand for highly reliable data storage systems with large data storage capacities and performance requirements. To preserve a high degree of data integrity, these applications must rely on intelligent data storage devices that can provide reliable indicators of data degradation. Error correction activity generally occurs within storage devices without notification to the host. Early indicators of degradation and media error monitoring 333 and reporting (MEMR) techniques implemented in data storage devices allow network storage management applications to notify system administrators of these events and to take appropriate corrective actions before catastrophic errors occur. Although MEMR techniques have been implemented in data storage devices for many years, until 1996 no MEMR standards existed. In 1996 the American National Standards Institute (ANSI) approved the only known (world-wide) industry standard specifying MEMR techniques to verify stored data on optical disks. This industry standard was developed under the auspices of the Association for Information and Image Management (AIIM). A recently formed AIIM Optical Tape Subcommittee initiated the development of another data integrity standard specifying a set of media error monitoring tools and media error monitoring information (MEMRI) to verify stored data on optical tape media. This paper discusses the need for intelligent storage devices that can provide data integrity metadata, the content of the existing data integrity standard for optical disks, and the content of the MEMRI standard being developed by the AIIM Optical Tape Subcommittee.

Top