7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
21 CFR 120.10 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 120.10 Section 120.10 Food and... actions. Whenever a deviation from a critical limit occurs, a processor shall take corrective action by... develop written corrective action plans, which become part of their HACCP plans in accordance with § 120.8...
40 CFR 280.66 - Corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... additional information or to develop and submit a corrective action plan for responding to contaminated soils...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
21 CFR 123.7 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... of their HACCP plans in accordance with § 123.6(c)(5), by which they predetermine the corrective... in accordance with § 123.10, to determine whether the HACCP plan needs to be modified to reduce the risk of recurrence of the deviation, and modify the HACCP plan as necessary. (d) All corrective actions...
77 FR 14047 - Guidance for Decommissioning Planning During Operations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...
7 CFR 275.17 - State corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false State corrective action plan. 275.17 Section 275.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... be taken, the expected outcome of each action, the target date for each action, and the date by which...
7 CFR 275.17 - State corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false State corrective action plan. 275.17 Section 275.17 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... be taken, the expected outcome of each action, the target date for each action, and the date by which...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less
7 CFR 248.17 - Management evaluations and reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... deficiencies and prevent their future recurrence. (iii) If the corrective action plan is acceptable, FNS will... plan, and whether the deficiency is resolved or further corrective action is needed. Compliance buys...
20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...
20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...
Response to Request for Correction #10007
Response to the American Chemistry Council's Request for Correction #10007 that challenged the objectivity and utility of statements in the EPA Bisphenol A Action Plan and refusal to edit the EPA Bisphenol A Action Plan.
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective actions. 417.3 Section 417... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan shall identify the corrective action to be followed in response to a deviation from a critical limit...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Boehlecke
2004-04-01
The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less
42 CFR 493.1832 - Directed plan of correction and directed portion of a plan of correction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... laboratory to take specific corrective action within specific time frames in order to achieve compliance; and... plan of correction continues in effect until the day suspension, limitation, or revocation of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-05-01
Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
Corrective Action Sites around the Nation
Provide info to the public/community orgs, local officials & consultants on nearby corrective action cleanups, the status of the cleanup and future plans. Links to the Natl Corrective Action, Cleanups in My Community & Cleaning Up Our Land, Water & Air
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada
1998-09-30
This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that themore » landfill cells were used for solid waste disposal, including disposal of UXO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1999-03-01
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less
Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup whichmore » occurred after test activities.« less
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
Code of Federal Regulations, 2011 CFR
2011-07-01
... with fabric filter Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in... operation Operate in accordance with OM&M plan. b Bag leak detector or Initiate corrective action within 1... accordance with OM&M plan. b Dross-only furnace with fabric filter Bag leak detector or Initiate corrective...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
2009-04-01
Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less
77 FR 44144 - National Forest System Land Management Planning; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendments. SUMMARY: The Department of Agriculture (USDA) published a National Forest System land management planning rule in the... document may be sent to the Director, Ecosystem Management Coordination Staff, USDA Forest Service, 1400...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24more » (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-08-01
The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
78 FR 8104 - First Phase of the Forest Planning Process for the Bio-Region; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-05
... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio-Region; Correction AGENCY: USDA, Forest Service. ACTION: Notice; correction. SUMMARY: The Department of... rule entitled First Phase of the Forest Planning Process for the Bio-Region. The document contained...
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. B. Jackson
2003-05-01
The Areas 25, 26 and 27 Septic Systems are in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 271. This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for CAU 271. CAU 271 is located on the Nevada Test Site (NTS) approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and consists of the following 15 Corrective Action Sites (CAS): CAS 25-04-1, Septic System; CAS 25-04-03, Septic System; CAS25-04-04, Septic System; CAS 25-04-08, Septic System; CAS 25-04-09, Septic System; CAS 25-04-10, Septic System; CAS 25-04-11, Septicmore » System; CAS 26-03-01, Contaminated Water Reservoir; CAS 26-04-1, Septic System; CAS 26-04-02, Septic System; CAS 26-05-01, Radioactive Leachfield; CAS-26-05-03, Septic System; CAS 26-05-04, Septic System; CAS 26-05-05, Septic System; and CAS 27-05-02, Leachfield.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE
2005-08-01
Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6)more » 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justificationmore » and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.« less
76 FR 76633 - Indian Tribal Governmental Plans; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-08
... Indian Tribal Governmental Plans; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... are considering proposing relating to the determination of whether a plan of an Indian Tribal government is a governmental plan within the meaning of section 414(d) and contains an appendix that includes...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
1999-03-26
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform video surveys of the discharge and outfall lines. (2) Collect samples of material in the septic tanks. (3) Conduct exploratory trenching to locate and inspect subsurface components. (4) Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. (5) Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. (6) Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. (7) Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. (10) Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. (11) Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
Quick Reaction Report on DoD Procurements Through the Tennessee Valley Authority
1992-04-03
from non-DoD agencies that includes sections to be completed and signed by a contracting officer. Recommendations for Corrective Actions We recommend...in the DD 350 Individual Contract Action Reporting System. The Assistant Secretary did not provide planned dates for completing the corrective actions ...will be reprocured. Tentative milestones for completion of the corrective actions were not identified. Defense Logistics Agency comments. The Deputy
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less
77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2005-05-01
This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.
45 CFR 284.45 - What are the contents and duration of the corrective action plan?
Code of Federal Regulations, 2011 CFR
2011-10-01
... POVERTY RATE IS THE RESULT OF THE TANF PROGRAM § 284.45 What are the contents and duration of the... manner in which the State or Territory will reduce its child poverty rate; (2) A description of the... corrective action plan until it determines and notifies us that its child poverty rate, as determined in...
45 CFR 284.45 - What are the contents and duration of the corrective action plan?
Code of Federal Regulations, 2014 CFR
2014-10-01
... POVERTY RATE IS THE RESULT OF THE TANF PROGRAM § 284.45 What are the contents and duration of the... manner in which the State or Territory will reduce its child poverty rate; (2) A description of the... corrective action plan until it determines and notifies us that its child poverty rate, as determined in...
45 CFR 284.45 - What are the contents and duration of the corrective action plan?
Code of Federal Regulations, 2013 CFR
2013-10-01
... POVERTY RATE IS THE RESULT OF THE TANF PROGRAM § 284.45 What are the contents and duration of the... manner in which the State or Territory will reduce its child poverty rate; (2) A description of the... corrective action plan until it determines and notifies us that its child poverty rate, as determined in...
45 CFR 284.45 - What are the contents and duration of the corrective action plan?
Code of Federal Regulations, 2012 CFR
2012-10-01
... POVERTY RATE IS THE RESULT OF THE TANF PROGRAM § 284.45 What are the contents and duration of the... manner in which the State or Territory will reduce its child poverty rate; (2) A description of the... corrective action plan until it determines and notifies us that its child poverty rate, as determined in...
45 CFR 284.45 - What are the contents and duration of the corrective action plan?
Code of Federal Regulations, 2010 CFR
2010-10-01
... POVERTY RATE IS THE RESULT OF THE TANF PROGRAM § 284.45 What are the contents and duration of the... manner in which the State or Territory will reduce its child poverty rate; (2) A description of the... corrective action plan until it determines and notifies us that its child poverty rate, as determined in...
20 CFR 633.315 - Replacement, corrective action, termination.
Code of Federal Regulations, 2012 CFR
2012-04-01
... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...
20 CFR 633.315 - Replacement, corrective action, termination.
Code of Federal Regulations, 2011 CFR
2011-04-01
... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NSO
The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker.more » Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of contamination, as necessary. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
40 CFR 141.802 - Coliform sampling plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...
40 CFR 141.802 - Coliform sampling plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2012-10-01
CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less
77 FR 13996 - Indian Tribal Government Plans; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [REG-133223-08] RIN 1545-BI19 Indian Tribal Government Plans; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... 12226) relating to Indian tribal government plans. FOR FURTHER INFORMATION CONTACT: Concerning the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less
77 FR 13996 - Determination of Governmental Plan Status; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [REG-157714-06] RIN 1545-BG43 Determination of Governmental Plan Status; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...) relating to the determination of governmental plans. FOR FURTHER INFORMATION CONTACT: Concerning the...
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Aluminum scrap shredder with fabric filter Bag leak detector or Initiate corrective action within 1-hr of... the performance test. Afterburner operation Operate in accordance with OM&M plan. b Bag leak detector... detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan...
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Aluminum scrap shredder with fabric filter Bag leak detector or Initiate corrective action within 1-hr of... the performance test. Afterburner operation Operate in accordance with OM&M plan. b Bag leak detector... detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan...
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Aluminum scrap shredder with fabric filter Bag leak detector or Initiate corrective action within 1-hr of... the performance test. Afterburner operation Operate in accordance with OM&M plan. b Bag leak detector... detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of themore » nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.« less
77 FR 12514 - Determination of Governmental Plan Status; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [REG-157714-06] RIN 1545-BG43 Determination of Governmental Plan Status; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... governmental plans. FOR FURTHER INFORMATION CONTACT: Concerning the proposed regulations, Pamela Kinard at (202...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-10-27
This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at Corrective Action Unit (CAU) Number 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (140 miles) northwest of Las Vegas, Nevada. CAU Number 423 is comprised of only one Corrective Action Site (CAS) which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (240more » feet) northwest. The UDP was used between approximately 1965 and 1990 to dispose of waste fluids from the Building 03-60 automotive maintenance shop. It is likely that soils surrounding the UDP have been impacted by oil, grease, cleaning supplies and solvents as well as waste motor oil and other automotive fluids released from the UDP.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2010-02-28
Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
2004-06-01
This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental corrective action alternatives. Corrective Action Unit 151 is located in Areas 2, 12, 18, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 151 is comprised of the nine Corrective Action Sites (CAS) listed below: (1) 02-05-01, UE-2ce Pond; (2)more » 12-03-01, Sewage Lagoons (6); (3) 12-04-01, Septic Tanks; (4) 12-04-02, Septic Tanks; (5) 12-04-03, Septic Tank; (6) 12-47-01, Wastewater Pond; (7) 18-03-01, Sewage Lagoon; (8) 18-99-09, Sewer Line (Exposed); and (9) 20-19-02, Photochemical Drain. The CASs within CAU 151 are discharge and collection systems. Corrective Action Site 02-05-01 is located in Area 2 and is a well-water collection pond used as a part of the Nash test. Corrective Action Sites 12-03-01, 12-04-01, 12-04-02, 12-04-03, and 12-47-01 are located in Area 12 and are comprised of sewage lagoons, septic tanks, associated piping, and two sumps. The features are a part of the Area 12 Camp housing and administrative septic systems. Corrective Action Sites 18-03-01 and 18-99-09 are located in the Area 17 Camp in Area 18. These sites are sewage lagoons and associated piping. The origin and terminus of CAS 18-99-09 are unknown; however, the type and configuration of the pipe indicates that it may be a part of the septic systems in Area 18. Corrective Action Site 20-19-02 is located in the Area 20 Camp. This site is comprised of a surface discharge of photoprocessing chemicals.« less
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, frommore » which the Team derived four key findings. In the Safety and Health (S H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES&H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from whichmore » the Team derived four key findings. In the Safety and Health (S&H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S&H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... DEPARTMENT OF EDUCATION William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public Comment Period; Correction AGENCY: Department of Education. ACTION: Correction notice... entitled, ``William D. Ford Federal Direct Loan Program Repayment Plan Selection Form''. ED is extending...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
2005-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02,more » Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andrews, Robert; Marutzky, Sam
2000-09-01
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wickline, Alfred
2004-04-01
This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 204 Storage Bunkers, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE); and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) north of Las Vegas, Nevada (Figure 1-1). The Corrective Action Sites (CASs) within CAU 204 are located in Areas 1, 2, 3, and 5 of the NTS, in Nye County, Nevada (Figure 1-2). Corrective Action Unit 204 ismore » comprised of the six CASs identified in Table 1-1. As shown in Table 1-1, the FFACO describes four of these CASs as bunkers one as chemical exchange storage and one as a blockhouse. Subsequent investigations have identified four of these structures as instrumentation bunkers (CASs 01-34-01, 02-34-01, 03-34-01, 05-33-01), one as an explosives storage bunker (CAS 05-99-02), and one as both (CAS 05-18-02). The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activities conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation.« less
75 FR 14491 - Potato Research and Promotion Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
...] Potato Research and Promotion Plan AGENCY: Agricultural Marketing Service, USDA. ACTION: Correcting amendments. SUMMARY: The Agricultural Marketing Service is making corrections to its Potato Research and..., Marketing Specialist, Research and Promotion Branch, Fruit and Vegetable Programs, AMS, USDA, 1400...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... Impact Statements To Incorporate Greater Sage-grouse Conservation Measures Into Land Use Plans and Land Management Plans AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Correction. SUMMARY: The BLM... Supplemental EISs, extends the scoping period, and adds 11 Forest Service Land Management Plans (LMPs) to this...
7 CFR 275.19 - Monitoring and evaluation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... Project Area/Management Unit Corrective Action Plan is implemented and achieves the anticipated results...
EPA published final rules in the Federal Register approving certain revisions to the California SIP. EPA included inaccurate amendatory instructions preventing incorporation of the actions into the CFR. All the errors are being corrected by this action.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV
This CAIP presents a plan to investigate the DTRSA where unregulated disposal of radioactive and possibly hazardous waste occurred during decontamination activities for the Double Tracks test. The purpose of the corrective action investigation described in this CAIP is to: Identify and verify the locations of the decontamination facility and animal burial pit within the DTRSA; Identify the presence and nature of COPCs; Determine the vertical and lateral extent of COPCs; and Provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS. This CAIP was developed using the U.S. Environmental Protection Agency (EPA) Data Qualitymore » Objectives (DQOs) (EPA, 1994d) process to clearly define the goals for collecting environmental data, to determine data uses, and to design a data collection program that will satisfy these uses. A DQO scoping meeting was held prior to preparation of this plan; a brief summary of the DQOs is presented in Section 3.4. A more detailed summary of the DQO process and results is included in Appendix A.« less
Exploiting map plans as resources for action
NASA Technical Reports Server (NTRS)
Payton, David
1989-01-01
When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 165 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 165 consists of eight Corrective Action Sites (CASs): CAS 25-20-01, Lab Drain Dry Well; CAS 25-51-02, Dry Well; CAS 25-59-01, Septic System; CAS 26-59-01, Septic System; CAS 25-07-06, Train Decontamination Area; CAS 25-07-07, Vehicle Washdown; CAS 26-07-01, Vehicle Washdown Station; and CAS 25-47-01, Reservoir and French Drain. All eight CASsmore » are located in the Nevada Test Site, Nevada. Six of these CASs are located in Area 25 facilities and two CASs are located in Area 26 facilities. The eight CASs at CAU 165 consist of dry wells, septic systems, decontamination pads, and a reservoir. The six CASs in Area 25 are associated with the Nuclear Rocket Development Station that operated from 1958 to 1973. The two CASs in Area 26 are associated with facilities constructed for Project Pluto, a series of nuclear reactor tests conducted between 1961 to 1964 to develop a nuclear-powered ramjet engine. Based on site history, the scope of this plan will be a two-phased approach to investigate the possible presence of hazardous and/or radioactive constituents at concentrations that could potentially pose a threat to human health and the environment. The Phase I analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. If laboratory data obtained from the Phase I investigation indicates the presence of contaminants of concern, the process will continue with a Phase II investigation to define the extent of contamination. Based on the results of Phase I sampling, the analytical program for Phase II investigation may be reduced. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
75 FR 10228 - Publication of State Plan Pursuant to the Help America Vote Act; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act; Correction AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice; correction. SUMMARY: The U.S... caption to read: SUMMARY: Pursuant to sections 254(a)(11)(A) and 255(b) of the Help America Vote Act (HAVA...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
24 CFR 590.31 - Corrective and remedial action.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...
24 CFR 590.31 - Corrective and remedial action.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
2015-03-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastor, Laura
2005-12-01
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada,more » and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.« less
77 FR 12226 - Indian Tribal Government Plans; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [REG-133223-08] RIN 1545-BI19 Indian Tribal Government Plans; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... the Federal Register on Friday, February 3, 2012 (77 FR 5442) relating to Indian tribal government...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-04-30
This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closedmore » by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0381; FRL-9747-9] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for Prevention of Significant...: Environmental Protection Agency (EPA). ACTION: Final rule; correcting amendment. SUMMARY: This document corrects...
Corrections in Grasp Posture in Response to Modifications of Action Goals
Hughes, Charmayne M. L.; Seegelke, Christian; Spiegel, Marnie Ann; Oehmichen, Corinna; Hammes, Julia; Schack, Thomas
2012-01-01
There is ample evidence that people plan their movements to ensure comfortable final grasp postures at the end of a movement. The end-state comfort effect has been found to be a robust constraint during unimanual movements, and leads to the inference that goal-postures are represented and planned prior to movement initiation. The purpose of this study was to examine whether individuals make appropriate corrections to ensure comfortable final goal postures when faced with an unexpected change in action goal. Participants reached for a horizontal cylinder and placed the left or right end of the object into the target disk. As soon as the participant began to move, a secondary stimuli was triggered, which indicated whether the intended action goal had changed or not. Confirming previous research, participants selected initial grasp postures that ensured end-state comfort during non-perturbed trials. In addition, participants made appropriate on-line corrections to their reach-to-grasp movements to ensure end-state comfort during perturbed trials. Corrections in grasp posture occurred early or late in the reach-to-grasp phase. The results indicate that individuals plan their movements to afford comfort at the end of the movement, and that grasp posture planning is controlled via both feedforward and feedback mechanisms. PMID:22970119
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
Massett, Holly A.; Mishkin, Grace; Rubinstein, Larry; Ivy, S. Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A.; Abrams, Jeffrey S.
2016-01-01
Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAPs) received for slow-accruing Phase 1 and 2 trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for Phase 1 trials and 66 for Phase 2 trials. Primary reasons cited for slow accrual were safety/toxicity (Phase 1: 48%), design/protocol concerns (Phase 1: 42%, Phase 2: 33%), and eligibility criteria (Phase 1: 41%, Phase 2: 35%). The most commonly proposed corrective actions were adding institutions (Phase 1: 43%, Phase 2: 85%) and amending the trial to change eligibility or design (Phase 1: 55%, Phase 2: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (Phase 1=48; Phase 2=46). Of these, 67% of Phase 1 and 70% of Phase 2 trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial lifecycles, but it may be more beneficial to invest in earlier accrual planning. PMID:27401246
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located withinmore » Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues, herbicides, pesticides, polychlorinated biphenyls, metals, and radionuclides. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. S. Tobiason
Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from bothmore » sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the discharge line at SWS 1 Septic Tank 33-1A (Figure 3). These concentrations are above the PALs of 3.0 mg/kg and 360 {micro}g/kg, respectively (DOE/NV, 1999) but are below the hazardous regulatory levels for these constituents. The soil will be excavated and disposed in the Nevada Test Site (NTS) Area 23 Sanitary Landfill.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-05-01
Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend correctivemore » action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.« less
An Exploration of Pennsylvania Corrective Action Plans, 2006-2007
ERIC Educational Resources Information Center
Morgan-Davis, Carrie Lynn
2013-01-01
With the "No Child Left Behind Act of 2001" ("NCLB"), signed into law on January 8, 2002, schools nationwide have been challenged to improve student achievement. Several middle and junior high schools in the Commonwealth of Pennsylvania were identified as being in need of Corrective Action in 2006 based upon data from the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
42 CFR 431.954 - Basis and scope.
Code of Federal Regulations, 2010 CFR
2010-10-01
... implementing any corrective action plans; requirements for State verification of an applicant's self-declaration or self-certification of eligibility for, and correct amount of, medical assistance under Medicaid...
On Motion Planning with Uncertainty. Revised.
1984-01-01
drift to the right, sticking at the right corner. See Fig. 1.6. Given the uncertainty in the position sensor, it is impossible to execute corrective ...action once * sticking is detected. This is because the corrective action depends on knowing the side at which sticking occurred. Worse than being...unable to correct errors should they occur, is the inability to detect success. In the given example, it is possible that the peg may move smoothly into
MO-G-BRE-08: Taxonomy of Corrective Actions in Radiotherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutlief, S; Brown, D
2014-06-15
Purpose: Various causal taxonomies have been developed for healthcare incidents and for radiation therapy in particular. The causal analysis of incidents leads to corrective actions which can also be organized into a taxonomy. Such a corrective action classification system would provide information about the situational context, the action type, and the leverage of the action in order to detect patterns in the corrective actions frequently employed in radiation therapy. It would also provide practical guidance to the radiation therapy community for determining the appropriateness and potential effectiveness of proposed corrective actions. Materials: A review of causal analysis reports and correctivemore » action plans was conducted using the following sources: US NRC medical event reports, IAEA reports, ROSIS submissions, US Veterans Health Administration reports, and singleincident report sources. The corrective actions presented in the published sources were then mapped onto four corrective action taxonomy prototypes: role-based, safety-context-based, responsibility-based, and hierarchy of hazard control. The resulting corrective action taxonomy was then validated through use of the published sources. Results: The responsibility-based taxonomy and hierarchy of hazard taxonomy provided more intuitive and sensible categories than the role-based taxonomy or the safety-context taxonomy. The most frequent corrective actions were added safety barriers, training, process standardization, and development of a quality improvement program where one was lacking. Conclusion: Published corrective action statements in radiation therapy emphasize what to do more so than whom the recipient is or which process step is affected. The hierarchy of hazard taxonomy provides a suitable framework for radiation therapy and has the advantage of providing insight into the likelihood that a particular corrective action will mitigate the recurrence of the error it was meant to correct. This information would be useful to medical center administration, safety personnel, and regulators who must assess the projected efficacy of corrective actions. Derek Brown is a director of TreatSafely, LLC.« less
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2012 CFR
2012-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2013 CFR
2013-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
Massett, Holly A; Mishkin, Grace; Rubinstein, Larry; Ivy, S Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A; Abrams, Jeffrey S
2016-11-15
Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAP) received for slow-accruing phase I and II trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for phase I trials and 66 for phase II trials. Primary reasons cited for slow accrual were safety/toxicity (phase I: 48%), design/protocol concerns (phase I: 42%, phase II: 33%), and eligibility criteria (phase I: 41%, phase II: 35%). The most commonly proposed corrective actions were adding institutions (phase I: 43%, phase II: 85%) and amending the trial to change eligibility or design (phase I: 55%, phase II: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (phase I = 48; phase II = 46). Of these, 67% of phase I and 70% of phase II trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial life cycles, but it may be more beneficial to invest in earlier accrual planning. Clin Cancer Res; 22(22); 5408-16. ©2016 AACRSee related commentary by Mileham and Kim, p. 5397. ©2016 American Association for Cancer Research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or withoutmore » remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.« less
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below themore » Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... or DLS/FF i. If you use a bag leak detection system, initiating corrective action within 1 hour of a bag leak detection system alarm and completing corrective actions in accordance with your OM&M plan... established during the performance test; and iv. If chemicals are added to the scrubber water, collecting the...
42 CFR 51.10 - Remedial actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Remedial actions. 51.10 Section 51.10 Public Health... actions. Failure to submit an annual report in the designated format on time or to submit requested information and documentation, corrective action plans and ongoing implementation status reports in response...
40 CFR 280.66 - Corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... submitting a plan that provides for adequate protection of human health and the environment as determined by... will adequately protect human health, safety, and the environment. In making this determination, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-FHC-2012-N030; FVHC98130406900Y4-XXX-FF04G01000] Correction Notice for Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability and request...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-04-01
Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluatemore » and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2010-03-01
Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Correctivemore » Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
2001-04-26
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 405, Area 3 Septic Systems, Tonopah Test Range (TTR), under the Federal Facility Agreement and Consent Order. Corrective Action Unit 405 consists of Corrective Action Sites 03-05-002-SW03, 03-05-002-SW04, and 03-05-002-SW07 (also collectively known as: Septic Waste Systems [SWSs] 3, 4, and 7). Located in Area 3 in the northwest section of the TTR, approximately 140 miles northwest of Las Vegas, this location was historically (betweenmore » 1960 and 1990) used as a research facility with the mission to perform defense-related projects, and whose operations generated sanitary and industrial wastewaters potentially contaminated with COPCs and disposed of in septic tanks and leachfields. Though Septic Waste Systems 3, 4, and 7 were origin ally constructed to receive sanitary sewage, they may have inadvertently received effluent containing potentially hazardous and radiological constituents containing acetone, benzene, ethylbenzene, 4-methyl-2-pentanone, toluene, xylenes, volatile organic compound constituents, phenols, arsenic, barium, lead, mercury, hydrocarbons of oil and grease, and uranium-234, -235, and -238. The Area 3 septic systems were documented in a DOE/NV 1996 report as being included in the septic tank abandonment program conducted by Sandia National Laboratories in 1993; however, this program was not completed and the possibility exists that some of the Area 3 septic tanks may not have been abandoned. Even though all of the SWSs addressed in this CAIP are inactive, geophysical surveys conducted in 1993 were generally inconclusive and did not provide useful data for the purposes of this investigation. The scope of this current investigation, therefore, will be to determine the existence of the identified CO PCs and excavation will be the primary investigation method employed for these leachfield systems, but this effort may be limited by existing facilities and utilities. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the subsequent corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
2002-11-12
This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krause
2010-08-01
This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2011-09-01
The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1998-06-01
This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less
12 CFR 702.305 - Prompt corrective action for “uncapitalized” new credit unions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... amount reflected in the credit union's approved initial or revised business plan; (2) Submit revised business plan. Submit a revised business plan within the time provided by § 702.306, providing for... increased its net worth ratio consistent with its then-present approved business plan; (ii) Has no then...
Pigeons (Columba livia) plan future moves on computerized maze tasks.
Miyata, Hiromitsu; Fujita, Kazuo
2008-07-01
Planning, the internal process of formulating an organized method about one's future behavior, should be advantageous for non-human animals as well as for humans. However, little is known about this process in avian species. We examined planning processes in pigeons (Columba livia) using a computerized maze task. In Experiment 1, we found that the pigeons plan their next one step, and in some cases even correctly adjust their actions after change of goal locations, while performing on a plus-shaped maze. We also showed that the pigeons might even plan two steps on familiar, well-practiced mazes. In Experiment 2, we discovered that the subjects plan the direction they would go first before starting to solve a four-arm shuriken (a Japanese traditional throwing knife)-shaped maze. The birds also corrected their previously planned actions after change of goal locations. Our results from these experiments suggest that planning ahead is within the cognitive capacity of a "bird brain", and that it may be more widespread in the animal kingdom than has been presumed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL,more » Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium, beryllium, total petroleum hydrocarbons; and total Resource Conservation and Recovery Act metals. Field activities will consist of geophysical and radiological surveys, and collecting soil samples at biased locations by appropriate methods. A two-step data quality objective strategy will be followed: (1) define the nature of contamination at each CAS location by identifying any contamination above preliminary action levels (PALs); and, (2) determine the extent of contamination identified above PALs. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
...: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to correct an... ozone. EPA is also taking final action to revise the boundaries of certain Southern California air...-2012-0936 for this action. The index to the docket is available electronically at www.regulations.gov...
ORNL Remedial Action Program strategy (FY 1987-FY 1992)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabalka, J.R.; Myrick, T.E.
1987-12-01
Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
Completion Report for Well ER-3-3 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wurtz, Jeffrey; Rehfeldt, Ken
Well ER-3-3 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from February 21 to March 15, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the WAGTAIL (U3an) underground test.
Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.« less
42 CFR 417.165 - Reapplication for qualification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Continued Regulation of Federally Qualified Health Maintenance Organizations... CMS for purposes of section 1310 of the PHS Act may, after completing the corrective action required...
77 FR 37439 - Notice of Lodging of Proposed Consent Decree Under the Clean Water Act
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... City of Perth Amboy, New Jersey a Municipal Corporation, and the State of New Jersey, Civil Action No... inspection and engineering assessment that will result in a corrective action plan that will include...
DOE Office of Scientific and Technical Information (OSTI.GOV)
none
1998-03-01
This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
2000-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2014-04-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 squaremore » miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-02-21
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-02-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit 168 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 168 consists of a group of twelve relatively diverse Corrective Action Sites (CASs 25-16-01, Construction Waste Pile; 25-16-03, MX Construction Landfill; 25-19-02, Waste Disposal Site; 25-23-02, Radioactive Storage RR Cars; 25-23-18, Radioactive Material Storage; 25-34-01, NRDS Contaminated Bunker; 25-34-02, NRDS Contaminated Bunker; CAS 25-23-13, ETL - Lab Radioactive Contamination; 25-99-16, USW G3;more » 26-08-01, Waste Dump/Burn Pit; 26-17-01, Pluto Waste Holding Area; 26-19-02, Contaminated Waste Dump No.2). These CASs vary in terms of the sources and nature of potential contamination. The CASs are located and/or associated wit h the following Nevada Test Site (NTS) facilities within three areas. The first eight CASs were in operation between 1958 to 1984 in Area 25 include the Engine Maintenance, Assembly, and Disassembly Facility; the Missile Experiment Salvage Yard; the Reactor Maintenance, Assembly, and Disassembly Facility; the Radioactive Materials Storage Facility; and the Treatment Test Facility Building at Test Cell A. Secondly, the three CASs located in Area 26 include the Project Pluto testing area that operated from 1961 to 1964. Lastly, the Underground Southern Nevada Well (USW) G3 (CAS 25-99-16), a groundwater monitoring well located west of the NTS on the ridgeline of Yucca Mountain, was in operation during the 1980s. Based on site history and existing characterization data obtained to support the data quality objectives process, contaminants of potential concern (COPCs) for CAU 168 are primarily radionuclide; however, the COPCs for several CASs were not defined. To address COPC uncertainty, the analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. Upon reviewing historical data and current site conditions, it has been determined that no further characterization is required at USW G3 (CAS 25-99-16) to select the appropriate corrective action. A cesium-137 source was encased in cement within the vadous zone during the drilling of the well (CAS 25-99-16). A corrective action of closure in place with a land-use restriction for drilling near USW G3 is appropriate. This corrective action will be documented in the Corrective Action Decision Document (CADD) for CAU 168. The results of the remaining field investigation will support a defensible evaluation of corrective action alternatives for the other CASs within CAU 168 in this CADD.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-12
... DEPARTMENT OF JUSTICE National Institute of Corrections Solicitation for a Cooperative Agreement... Institute of Corrections, U.S. Department of Justice. ACTION: Solicitation for a Cooperative Agreement.... Eligibility of Applicants: An eligible applicant is any public or private agency, educational institution...
Code of Federal Regulations, 2010 CFR
2010-01-01
... net worth by the amount reflected in its approved initial or revised business plan and quarterly... plan. Submit a revised business plan within the time provided by § 702.306 if the credit union either: (i) Has not increased its net worth ratio consistent with its then-present approved business plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Offices's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 127 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 127 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of 12 Corrective Action Sites (CASs) located at Test Cell C; the Engine Maintenance, Assembly, and Disassembly (E-MAD) Facility; the X-Tunnel in Area 25; the Pluto Disassembly Facility; themore » Pluto Check Station; and the Port Gaston Training Facility in Area 26. These CASs include: CAS 25-01-05, Aboveground Storage Tank (AST); CAS 25-02-02, Underground Storage Tank (UST); CAS 25-23-11, Contaminated Materials; CAS 25-12-01, Boiler; CAS 25-01-06, AST; CAS 25-01-07, AST; CAS 25-02-13, UST; CAS 26- 01-01, Filter Tank (Rad) and Piping; CAS 26-01-02, Filter Tank (Rad); CAS 26-99-01, Radioactively Contaminated Filters; CAS 26-02-01, UST; CAS 26-23-01, Contaminated Liquids Spreader. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for CAU 127 include radionuclides, metals, total petroleum hydrocarbons, volatile organic compounds, asbestos, and polychlorinated biphenyls. Additionally, beryllium may be present at some locations. The sources of potential releases are varied, but releases of contaminated liquids may have occurred and may have migrated into and impacted soil below and surrounding storage vessels at some of the CASs. Also, at several CASs, asbestos-containing materials may be present on the aboveground structures and may be friable. Exposure pathways are limited to ingestion, inhalation, and dermal contact (adsorption) of soils/sediments or liquids, or inhalation of contaminants by site workers due to disturbance of contaminated materials. Future land-use scenarios limit subsequent uses of the CASs to various nonresidential (i.e., industrial) activities. Field activities will consist of radiological walkover and screening surveys, and field-screening and collecting of both tank content and soil samples, and further sample testing as appropriate. A two-step data quality objective strategy will be followed: (1) Phase I will be to collect environmental samples for laboratory analysis to confirm the presence or absence of contaminants at concentrations exceeding preliminary action levels; and (2) Phase II will be to collect additional environmental samples for laboratory analysis to determine the extent of contamination identified in Phase I. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Code of Federal Regulations, 2012 CFR
2012-04-01
... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the...) Being discharged from publicly funded institutions and systems of care, such as health-care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and...
Code of Federal Regulations, 2013 CFR
2013-04-01
... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the...) Being discharged from publicly funded institutions and systems of care, such as health-care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
..., Office of Planning & Informatics, Center for Drug Evaluation and Research, Food and Drug Administration... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0643...: Food and Drug Administration, HHS. ACTION: Notice; correction. [[Page 76050
30 CFR 250.525 - What do I submit if my casing diagnostic test requires action?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What do I submit if my casing diagnostic test... if my casing diagnostic test requires action? Within 14 days after you perform a casing diagnostic... Corrective Action Plan within 30 days of the diagnostic test. (b) a casing pressure request, Regional...
23 CFR 230.409 - Contract compliance review procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., written corrective action plans, PR-1391 or Manpower Utilization Reports, training requirements, previous... result in increased utilization of minorities and women? (iv) Is there impartiality in treatment of...) Have the contractor's efforts produced results? (f) Exit conference (Action R-6). (1) During the exit...
23 CFR 230.409 - Contract compliance review procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., written corrective action plans, PR-1391 or Manpower Utilization Reports, training requirements, previous... result in increased utilization of minorities and women? (iv) Is there impartiality in treatment of...) Have the contractor's efforts produced results? (f) Exit conference (Action R-6). (1) During the exit...
23 CFR 230.409 - Contract compliance review procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., written corrective action plans, PR-1391 or Manpower Utilization Reports, training requirements, previous... result in increased utilization of minorities and women? (iv) Is there impartiality in treatment of...) Have the contractor's efforts produced results? (f) Exit conference (Action R-6). (1) During the exit...
23 CFR 230.409 - Contract compliance review procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., written corrective action plans, PR-1391 or Manpower Utilization Reports, training requirements, previous... result in increased utilization of minorities and women? (iv) Is there impartiality in treatment of...) Have the contractor's efforts produced results? (f) Exit conference (Action R-6). (1) During the exit...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
The Phthalate Esters Panel (Panel) of the American Chemistry Council submits this Request for Correction to EPA under the Guidelines for Ensuring and Maximizing the Quality, Objectivity, Utility, and Integrity, of Information Disseminated by the Environmental Protection Agency
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
... tons per day of municipal solid waste (MSW). This action corrects an error in the regulatory language... per day of municipal solid waste (MSW), and for which construction, reconstruction, or modification... Municipal Waste Combustor (LMWC) Emissions From Existing Facilities; Correction AGENCY: Environmental...
20 CFR 652.8 - Administrative provisions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... openings, labor market information, and similar items are allowable. (5) Each State shall retain basic... determination. Such determinations shall be based on the requirements of the Act, regulations, and State plan... corrective actions for violation of the Act, regulations, or State plan, including the following: (i...
20 CFR 652.8 - Administrative provisions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... openings, labor market information, and similar items are allowable. (5) Each State shall retain basic... determination. Such determinations shall be based on the requirements of the Act, regulations, and State plan... corrective actions for violation of the Act, regulations, or State plan, including the following: (i...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule; correction. SUMMARY: The Pension Benefit Guaranty Corporation published in the...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CMS, designed to reduce improper payments in each program based on its analysis of the error causes in... State must take the following actions: (1) Data analysis. States must conduct data analysis such as reviewing clusters of errors, general error causes, characteristics, and frequency of errors that are...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CMS, designed to reduce improper payments in each program based on its analysis of the error causes in... State must take the following actions: (1) Data analysis. States must conduct data analysis such as reviewing clusters of errors, general error causes, characteristics, and frequency of errors that are...
Government review of the Mod-2 wind turbine (as-built)
NASA Technical Reports Server (NTRS)
Johnson, W. R.; Birchenough, A. G.; Linscott, B. S.; Reagan, J. R.; Sirocky, P. J.; Sizemore, R. L.; Sullivan, T. L.; Holeman, R. H.
1985-01-01
The findings and recommendations of the Government committee formed to conduct an as-built review of the three Mod-2 wind turbine units at Goldendale, Washington are given. The purpose of the review was to identify any critical deficiencies in machine components that could result in failure, and to recommend any necessary corrective action before resuming safe machine operation. The review concluded that one of the deficiencies identified would preclude planned attended or unattended operation, provided that certain corrective actions were implemented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
2006-09-01
This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... 52.2424(c) for the Fredericksburg Area. This action corrects these oversights. Section 553 of the... Plan for the Fredericksburg Area to read as follows: Sec. 52.2420 Identification of plan. * * * * * (e... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0444; FRL-9760-9] Approval and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
IT Corporation, Las Vegas, NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfillsmore » used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will concentrate on geophysical surveys to confirm the presence or absence of disposed waste within a CAS and verify the boundaries of disposal areas; penetrate disposal feature covers via excavation and/or drilling; perform geodetic surveys; and be used to collect both soil and environmental samples for laboratory analyses. Phase II will deal only with those CASs where a contaminant of concern has been identified. This phase will involve the collection of additional soil and/or environmental samples for laboratory analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are locatedmore » in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).« less
Affirmative Action Plan, October 1987 through September 1988
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-10-01
This report documents Reynolds Electrical and Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations.
Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.
2015-01-01
In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews and Dawn Peterson
2011-09-01
Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... Planning Area (WPA) in the Gulf of Mexico; Correction AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice; correction. SUMMARY: The Bureau of Ocean Energy Management published a notice... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Notice of Availability of the...
78 FR 60301 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-01
... Evaluation Program (HSEEP) After Action Report (AAR) Improvement Plan (IP). DATES: Comments must be submitted...) Improvement Plan (IP) provides a standardized method for reporting the results of preparedness exercises and identifying, correcting and sharing as appropriate strengths and areas for improvement. Thus, the HSEEP AAR/IP...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2011 CFR
2011-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2013 CFR
2013-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2012 CFR
2012-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2014 CFR
2014-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
40 CFR 63.1367 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
Differentiating between precursor and control variables when analyzing reasoned action theories.
Hennessy, Michael; Bleakley, Amy; Fishbein, Martin; Brown, Larry; Diclemente, Ralph; Romer, Daniel; Valois, Robert; Vanable, Peter A; Carey, Michael P; Salazar, Laura
2010-02-01
This paper highlights the distinction between precursor and control variables in the context of reasoned action theory. Here the theory is combined with structural equation modeling to demonstrate how age and past sexual behavior should be situated in a reasoned action analysis. A two wave longitudinal survey sample of African-American adolescents is analyzed where the target behavior is having vaginal sex. Results differ when age and past behavior are used as control variables and when they are correctly used as precursors. Because control variables do not appear in any form of reasoned action theory, this approach to including background variables is not correct when analyzing data sets based on the theoretical axioms of the Theory of Reasoned Action, the Theory of Planned Behavior, or the Integrative Model.
Differentiating Between Precursor and Control Variables When Analyzing Reasoned Action Theories
Hennessy, Michael; Bleakley, Amy; Fishbein, Martin; Brown, Larry; DiClemente, Ralph; Romer, Daniel; Valois, Robert; Vanable, Peter A.; Carey, Michael P.; Salazar, Laura
2010-01-01
This paper highlights the distinction between precursor and control variables in the context of reasoned action theory. Here the theory is combined with structural equation modeling to demonstrate how age and past sexual behavior should be situated in a reasoned action analysis. A two wave longitudinal survey sample of African-American adolescents is analyzed where the target behavior is having vaginal sex. Results differ when age and past behavior are used as control variables and when they are correctly used as precursors. Because control variables do not appear in any form of reasoned action theory, this approach to including background variables is not correct when analyzing data sets based on the theoretical axioms of the Theory of Reasoned Action, the Theory of Planned Behavior, or the Integrative Model PMID:19370408
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-09-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less
Better Assessment of Operational Suitability. Volume 2. Case Studies
1992-01-01
August to 25 October 1988. Although declared operationally effective and suitable by OTEA, a Corrective Action Plan (CAP) was instituted on 5 December 1988...to correct performance deficiencies encountered in FOT&E. The option year 3 procureiaent was exercised on 8 December 1988. An OTEA assessment of the...Hughes developed and tested airframe design modifications to correct deficiencies noted in DT POT I, to improve flight handling characteristics, and to
Peer Support Action Plan: Northwest Fire and Rescue.
Dowdall-Thomae, Cynthia; Culliney, Sean; Piechura, Jeff
2009-01-01
Cumulative stress among firefighters may present as behavior changes that could be considered destructive for an individual and for the fire crew on which they serve. Through the use of effective leadership and open communication between personnel, destructive behaviors may be mitigated before a cascade of poor decisions affects the health and livelihood of the individual and those around him/her The Peer Support Action Plan presents several different intervention techniques in order to best cope with destructive behaviors, while providing follow-up and continued support by a trained Peer Support Action Team. The Peer Support Action Plan is not a disciplinary measure nor is it a guarantee of continued employment, but rather a coaching and support strategy to correct behaviors and keep firefighters at their optimum level of functioning and performance through coping efficacy (problem focused and seeking social support).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 414 is located on the Tonopah Test Range, which is approximately 130 miles northwest of Las Vegas, Nevada, and approximately 40 miles southeast of Tonopah, Nevada. The CAU 414 site consists of the release of radionuclides to the surface and shallow subsurface from the conduct of the Clean Slate III (CSIII) storage–transportation test conducted on June 9, 1963. CAU 414 includes one corrective action site (CAS), TA-23-03CS (Pu Contaminated Soil). The known releases at CAU 414 are the result of the atmospheric dispersal of contamination from the 1963 CSIII test. The CSIII test was a nonnuclearmore » detonation of a nuclear device located inside a reinforced concrete bunker covered with 8 feet of soil. This test dispersed radionuclides, primarily uranium and plutonium, on the ground surface. The presence and nature of contamination at CAU 414 will be evaluated based on information collected from a corrective action investigation (CAI). The investigation is based on the data quality objectives (DQOs) developed on June 7, 2016, by representatives of the Nevada Division of Environmental Protection; the U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective action alternatives for CAU 414.« less
Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vallem, Mallikarjuna R.; Vyakaranam, Bharat GNVSR; Holzer, Jesse T.
2017-10-19
Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis bymore » developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. M. Fitzmaurice
2001-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ravindranath, B; Xiong, J; Happersett, L
2016-06-15
Purpose: To quantify and compare the dosimetric impact of motion management correction strategies during VMAT and IMRT for hypofractionated prostate treatment. Methods: Two arc VMAT and 9 field IMRT plans were generated for two prostate cancer patients undergoing hypofractionated radiotherapy (7.5Gy × 5 and 8Gy × 5). 212 motion traces were retrospectively extracted from treatment records of prostate cancer patients with implanted Calypso beacons. Dose to the CTV and normal tissues was reconstructed for each trace and plan taking into account the actual treatment delivery time. Following motion correction scenarios were simulated: (1) VMAT plan – (a) No correction, (b)more » correction between arcs, (c) correction every 20 degrees of gantry rotation and (2) IMRT plan - (a) No correction,(b) correction between fields. Two mm action threshold for position correction was assumed. The 5–95% confidence interval (CI) range was extracted from the family of DVHs for each correction scenario. Results: Treatment duration for 8Gy plan (VMAT vs IMRT) was 3 vs 12 mins and for 7.5Gy plan was 3 vs 9 mins. In the absence of correction, the VMAT 5–−95% CI dose spread was, on average, less than the IMRT dose spread by 2% for CTVD95, 9% for rectalwall (RW) D1cc and 9% for bladderwall (BW) D53. Further, VMAT b/w arcs correction strategy reduced the spread about the planned value compared to IMRT b/w fields correction by: 1% for CTVD95, 2.6% for RW1cc and 2% for BWD53. VMAT 20 degree strategy led to greater reduction in dose spread compared to IMRT by: 2% for CTVD95, 4.5% for RW1cc and 6.7% for BWD53. Conclusion: In the absence of a correction strategy, the limited motion during VMAT’s shorter delivery times translates into less motion-induced dosimetric degradation than IMRT. Performing limited periodic motion correction during VMAT can yield excellent conformity to planned values that is superior to IMRT. This work was partially supported by Varian Medical Systems.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... Deterioration'' to approve changes to Georgia's SIP-approved regulations entitled ``Air Quality Control Rule 391... a separate action, the correct version of EPA's proposed rulemaking related to Georgia's Air Quality Control Rule 391-3-.1 is being provided for public comment. This course of action will promote efficiency...
Project #OA-FY16-0179, May 5, 2016. The EPA OIG plans to begin research on EPA actions to address operational deficiencies relative to QA requirements and staff technical competencies at the National Center for Radiation Field Operations (NCRFO).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-09-30
The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. From 1952 to present, Ciba-Geigy, formerly Geigy Chemical Corporation, has produced various chemicals including DDT, laundry products, herbicides, insecticides, agricultural chelating agents, sequestering agents, plastic resins and additives, antioxidants, and specialty chemicals. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. In 1987, as part of the corrective action plan requirements, Ciba-Geigy installed an additional wastewater treatment system and ground water monitoring wells.more » The ROD addresses highly contaminated soil and sludge at 10 of the 11 former waste management areas as OU2. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs including benzene and toluene; other organics including PCBs and pesticides (e.g., DDT); and metals including lead. The selected remedial action for the site is included.« less
van Osch, Liesbeth; Beenackers, Mariëlle; Reubsaet, Astrid; Lechner, Lilian; Candel, Math; de Vries, Hein
2009-01-01
Background Large discrepancies between people's intention to eat a healthy diet and actual dietary behavior indicate that motivation is not a sufficient instigator for healthy behavior. Research efforts to decrease this 'intention - behavior gap' have centered on aspects of self-regulation, most importantly self-regulatory planning. Most studies on the impact of self-regulatory planning in health and dietary behavior focus on the promotion of health protective behaviors. This study investigates and compares the predictive value of action planning in health protective behavior and the restriction of health risk behavior. Methods Two longitudinal observational studies were performed simultaneously, one focusing on fruit consumption (N = 572) and one on high-caloric snack consumption (N = 585) in Dutch adults. Structural equation modeling was used to investigate and compare the predictive value of action planning in both behaviors, correcting for demographics and the influence of motivational factors and past behavior. The nature of the influence of action planning was investigated by testing mediating and moderating effects. Results Action planning was a significant predictor of fruit consumption and restricted snack consumption beyond the influence of motivational factors and past behavior. The strength of the predictive value of action planning did not differ between the two behaviors. Evidence for mediation of the intention - behavior relationship was found for both behaviors. Positive moderating effects of action planning were demonstrated for fruit consumption, indicating that individuals who report high levels of action planning are significantly more likely to translate their intentions into actual behavior. Conclusion The results indicate that the planning of specific preparatory actions predicts the performance of healthy dietary behavior and support the application of self-regulatory planning in both health protective and health risk behaviors. Future interventions in dietary modification may turn these findings to advantage by incorporating one common planning protocol to increase the likelihood that good intentions are translated into healthy dietary behavior. PMID:19825172
Better Oversight Needed for Safety and Health Activities at DOE’s Nuclear Facilities.
1981-08-04
States Acca !3ion Tor Kl. ; BRA&I DTIC TAi \\ • inounced Jusl Lfii I "• ’ DiStril on/ r\\ D i Avai3 i - ’•ity Coi a j...m*d——I—^1 I —* Even DOE’s audit report tracking system failed to adequately document corrective actions taken or planned. This system was...designed by DOE to ensure that corrective actions on audit report recommendations are responsive, timely and complete. Audit re- ports, such as ours
ERIC Educational Resources Information Center
Figlio, Mary Ellen
1979-01-01
Asbestos in the schools has become a serious problem. Current activity in inspecting for asbestos and plans for corrective action are discussed. Suggestions are offered administrators in choosing contractors for asbestos removal. (MLF)
Singleton, Christa-Marie; Debastiani, Summer; Rose, Dale; Kahn, Emily B
2014-01-01
To identify the extent to which the Homeland Security Exercise and Evaluation Program's (HSEEP) After Action Report/Improvement Plan (AAR/IP) template was followed by public health entities and facilitated the identification of detailed corrective actions and continuous improvement. Data were drawn from the US H1N1 Public Health Emergency Response (PHER) federal grant awardees (n = 62). After action report/improvement plan text was examined to identify the presence of AAR/IP HSEEP elements and characterized as "minimally complete," "partially complete," or "complete." Corrective actions (CA) and recommendations within the IP focusing on performance deficits were coded as specific, measurable, and time-bound, and whether they were associated with a problem that met root cause criteria and whether the CA/recommendation was intended to address or fix the root cause. A total of 2619 CA/recommendations were identified. More than half (n = 1480, 57%) addressed root causes. Corrective actions/recommendations associated with complete AARs more frequently addressed root cause (58% vs 51%, χ = 9.1, P < 0.003) and were more specific (34% vs 23%, χ = 32.3, P < 0.0001), measurable (30% vs 18%, χ = 37.9, P < 0.0001), and time-bound (38% vs 15%, χ = 115.5, P < 0.0001) than partially complete AARs. The same pattern was not observed with completeness of IPs. Corrective actions and recommendations were similarly specific and measurable. Recommendations significantly addressed root cause more than CAs. Our analysis indicates a possible lack of awardee distinction between CA and recommendations in AARs. As HSEEP adapts to align with the 2011 National Preparedness Goal and National Preparedness System, future HSEEP documents should emphasize the importance of root cause analysis as a required element within AAR documents and templates in the exercise and real incident environment, as well as the need for specific and measurable CAs.
A manufacturer's perspective: Hewlett Packard Y2K action plan.
Rapp, W N
1999-01-01
Medical device manufacturers must ensure that their devices are safe and effective including investigating issues involved with the century rollover. Manufacturers must begin early to evaluate their products in order to allow time to correct and distribute these product corrections and communicate to their customers so they can prepare for the Y2K event.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick and Sloop, Christy
2011-04-01
This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less
CSAPR June Revisions Rule (77 FR 34830)
EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).
ERIC Educational Resources Information Center
Potter, Penny F.; Graham-Moore, Brian E.
Most organizations planning to assess adverse impact or perform a stock analysis for affirmative action planning must correctly classify their jobs into appropriate occupational categories. Two methods of job classification were assessed in a combination archival and field study. Classification results from expert judgment of functional job…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
TERRA Battery Thermal Control Anomaly - Simulation and Corrective Actions
NASA Technical Reports Server (NTRS)
Grob, Eric W.
2010-01-01
The TERRA spacecraft was launched in December 1999 from Vandenberg Air Force Base, becoming the flagship of NASA's Earth Observing System program to gather data on how the planet's processes create climate. Originally planned as a 5 year mission, it still provides valuable science data after nearly 10 years on orbit. On October 13th, 2009 at 16:23z following a routine inclination maneuver, TERRA experienced a battery cell failure and a simultaneous failure of several battery heater control circuits used to maintain cell temperatures and gradients within the battery. With several cells nearing the minimum survival temperature, preventing the electrolyte from freezing was the first priority. After several reset attempts and power cycling of the control electronics failed to reestablish control authority on the primary side of the controller, it was switched to the redundant side, but anomalous performance again prevented full heater control of the battery cells. As the investigation into the cause of the anomaly and corrective action continued, a battery thermal model was developed to be used in determining the control ability remaining and to simulate and assess corrective actions. Although no thermal model or detailed reference data of the battery was available, sufficient information was found to allow a simplified model to be constructed, correlated against pre-anomaly telemetry, and used to simulate the thermal behavior at several points after the anomaly. It was then used to simulate subsequent corrective actions to assess their impact on cell temperatures. This paper describes the rapid development of this thermal model, including correlation to flight data before and after the anomaly., along with a comparative assessment of the analysis results used to interpret the telemetry to determine the extent of damage to the thermal control hardware, with near-term corrective actions and long-term operations plan to overcome the anomaly.
Applying a Generic Intelligent Tutoring System (ITS) Authoring Tool to Specific Military Domains
2006-01-01
to evaluate a student’s actions in a free play simulation, or comparison to correct and likely incorrect solutions for each scenario. There are...the student’s actions in the free play simulation. IISAT’s comparison libraries successfully evaluated a student’s battle plan with the addition of
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-14
... Matter and Ozone; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule..., Nitrogen oxides, Ozone, Particulate matter, Regional haze, Reporting and recordkeeping requirements, Sulfur...
CSAPR Direct Final Rule (77 FR 10342)
EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).
Response to Request for Correction 10001
Reponse to the Phthalate Esters Panel of the American Chemistry Council, in which the EPA concludes that the underlying information and conclusions presented in the Phthalates Action Plan are objective and of high quality.
Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less
Department of Defense Performance and Accountability Report, Fiscal Year 2006
2006-11-15
FY 2006 with a total of 35, resulting in a net gain of one material weakness over FY 2005. Each weakness and their corrective action plans are...held due to statutory requirements for use in national defense, conservation, or national emergencies. The Annual Materials Plan lists the maximum...of non- materiality instances where planning for periods of crisis were not fully developed. (Office of the Under Secretary of Defense
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
Learning reliable manipulation strategies without initial physical models
NASA Technical Reports Server (NTRS)
Christiansen, Alan D.; Mason, Matthew T.; Mitchell, Tom M.
1990-01-01
A description is given of a robot, possessing limited sensory and effectory capabilities but no initial model of the effects of its actions on the world, that acquires such a model through exploration, practice, and observation. By acquiring an increasingly correct model of its actions, it generates increasingly successful plans to achieve its goals. In an apparently nondeterministic world, achieving reliability requires the identification of reliable actions and a preference for using such actions. Furthermore, by selecting its training actions carefully, the robot can significantly improve its learning rate.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-26
...) of the Administrative Procedure Act (APA) which, upon finding ``good cause,'' authorizes agencies to... is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date less than 30 days after...
12 CFR 208.44 - Capital restoration plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Action § 208.44 Capital restoration plans. (a) Schedule for filing plan—(1) In general. A member bank... § 208.43(c) shall include a description of the steps the bank will take to correct the unsafe or unsound... section 38(e)(2)(C) of that Act by each company that controls the bank. (c) Review of capital restoration...
Model Checking Artificial Intelligence Based Planners: Even the Best Laid Plans Must Be Verified
NASA Technical Reports Server (NTRS)
Smith, Margaret H.; Holzmann, Gerard J.; Cucullu, Gordon C., III; Smith, Benjamin D.
2005-01-01
Automated planning systems (APS) are gaining acceptance for use on NASA missions as evidenced by APS flown On missions such as Orbiter and Deep Space 1 both of which were commanded by onboard planning systems. The planning system takes high level goals and expands them onboard into a detailed of action fiat the spacecraft executes. The system must be verified to ensure that the automatically generated plans achieve the goals as expected and do not generate actions that would harm the spacecraft or mission. These systems are typically tested using empirical methods. Formal methods, such as model checking, offer exhaustive or measurable test coverage which leads to much greater confidence in correctness. This paper describes a formal method based on the SPIN model checker. This method guarantees that possible plans meet certain desirable properties. We express the input model in Promela, the language of SPIN and express the properties of desirable plans formally.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
Seki, Akira; Miya, Tetsumasa
2011-03-01
As a result of recurring medical accidents, risk management in the medical setting has been given much attention. The announcement in August, 2000 by the Ministry of Health committee for formulating a standard manual for risk management, of a "Risk management manual formulation guideline" has since been accompanied by the efforts of numerous medical testing facilities to develop such documents. In 2008, ISO/TS 22367:2008 on "Medical laboratories-Reduction of error through risk management and continual improvement" was published. However, at present, risk management within a medical testing facility stresses the implementation of provisional actions in response to a problem after it has occurred. Risk management is basically a planned process and includes "corrective actions" as well as "preventive actions." A corrective action is defined as identifying the root cause of the problem and removing it, and is conducted to prevent the problem from recurring. A preventive action is defined as identifying of the any potential problem and removing it, and is conducted to prevent a problem before it occurs. Presently, I shall report on the experiences of our laboratory regarding corrective and preventive actions taken in response to accidents and incidents, respectively.
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-07-01
Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less
Notification: Follow-up on a Framework for Developing Tribal Capacity
Project #OA-FY12-0333, March 1, 2012. We plan to follow-up on the 2008 report Framework for Developing Tribal Capacity Needed in the Indian General Assistance Program. and the Agency’s corrective actions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark; Gallo, Patricia
Corrective Action Unit (CAU) 413 is located on the Tonopah Test Range, which is approximately 130 miles northwest of Las Vegas, Nevada, and approximately 40 miles southeast of Tonopah, Nevada. The CAU 413 site consists of the release of radionuclides to the surface and shallow subsurface from the conduct of the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. CAU 413 includes one corrective action site (CAS), TA-23-02CS (Pu Contaminated Soil). The known releases at CAU 413 are the result of the atmospheric deposition of contamination from the 1963 CSII test. The CSII test was a non-nuclearmore » detonation of a nuclear device located inside a reinforced concrete bunker covered with 2 feet of soil. This test dispersed radionuclides, primarily plutonium, on the ground surface. The presence and nature of contamination at CAU 413 will be evaluated based on information collected from a corrective action investigation (CAI). The investigation is based on the data quality objectives (DQOs) developed on June 17, 2015, by representatives of the Nevada Division of Environmental Protection; the U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 413. The CAI will include radiological surveys, geophysical surveys, collection and analyses of soil samples, and assessment of investigation results. The collection of soil samples will be accomplished using both probabilistic and judgmental sampling approaches. To facilitate site investigation and the evaluation of DQO decisions, the releases at CAU 413 have been divided into seven study groups.« less
Design and validation of pictograms in a pediatric anaphylaxis action plan.
Mok, Garrick; Vaillancourt, Régis; Irwin, Danica; Wong, Alexandre; Zemek, Roger; Alqurashi, Waleed
2015-05-01
Current anaphylaxis action plans (AAPs) are based on written instructions without inclusion of pictograms. To develop an AAP with pictorial aids and to prospectively validate the pictogram components of this plan. Participants recruited from the emergency department and allergy clinic participated in a questionnaire to validate pictograms depicting key counseling points of an anaphylactic reaction. Children ≥ 10 years of age and caregivers of children < 10 years with acute anaphylaxis or who carried epinephrine auto-injector for confirmed allergy were eligible. Guessability, translucency, and recall were assessed for 11 pictogram designs. Pictograms identified as correct or partially correct by at least 85% of participants were considered valid. Three independent reviewers assessed these outcome measures. Of the 115 total participants, 73 (63%) were female, 76 (66%) were parents/guardians, and 39 (34%) were children aged 10-17. Overall, 10 pictograms (91%) reached ≥ 85% for correct guessability, translucency, and recall. Four pictograms were redesigned to reach the preset validation target. One pictogram depicting symptom management (5-min wait time after first epinephrine treatment) reached 82% translucency after redesign. However, it reached 98% and 100% of correct guessability and recall, respectively. We prospectively designed and validated a set of pictograms to be included in an AAP. The incorporation of validated pictograms into an AAP may potentially increase comprehension of the triggers, signs and symptoms, and management of an anaphylactic reaction. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Affirmative Action Plan, October 1991--September 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-10-01
This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Examining action effects in the execution of a skilled soccer kick by using erroneous feedback.
Ford, Paul; Hodges, Nicola J; Williams, A Mark
2007-11-01
The authors examined the role of action effects (i.e., ball trajectory) during the performance of a soccer kick. Participants were 20 expert players who kicked a ball over a height barrier toward a ground-level target. The authors occluded participants' vision of the ball trajectory after foot-to-ball contact. Participants in a 1st group received erroneous feedback from a video that showed a ball-trajectory apex approximately 75 cm lower than that of their actual kick, although the ball's landing position was unaltered. Participants in a 2nd group received correct video feedback of both the ball trajectory and the landing position. The erroneous-feedback group showed a significant bias toward higher ball trajectories than did the correct-feedback group. The authors conclude that performers at high levels of skill use the visual consequences of the action to plan and execute an action.
Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-08-15
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2013 CFR
2013-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2014 CFR
2014-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2012 CFR
2012-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2011 CFR
2011-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2010 CFR
2010-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 9.101 Section 9.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... contract or grant. It does not include agency actions such as contract audits, site visits, corrective...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister and Patrick Matthews
2012-11-01
The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Strand
2006-05-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. A Tier 2 evaluation was conducted, and a FAL of 185,000 micrograms per kilogram was calculated for chlordane at CASs 16-04-01, 16-04-02, and 16-04-03 based on an occasional use area exposure scenario. This evaluation of chlordane based on the Tier 2 FAL determined that no FALs were exceeded. Therefore, the DQO data needs were met, and it was determined that no corrective action (based on risk to human receptors) is necessary for the site. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) The surface soil surrounding the main concrete pad at CAS 23-20-01 contained Aroclor-1254, Aroclor-1260, and chlordane above the FALs. This soil, along with the COCs, was subsequently removed at CAS 23-20-01. (2) The sludge in the concrete box of the catch basin at the large concrete pad at CAS 23-20-01 contained lead and benzo(a)pyrene above the FALs. This contamination was limited to the sludge in the concrete box of the catch basin and did not migrate to the subsurface features beneath it. The contaminated and the concrete box of the catch basin were subsequently recovered at CAS 23-20-01.« less
Galvan, T L; Burkness, E C; Hutchison, W D
2007-06-01
To develop a practical integrated pest management (IPM) system for the multicolored Asian lady beetle, Harmonia axyridis (Pallas) (Coleoptera: Coccinellidae), in wine grapes, we assessed the spatial distribution of H. axyridis and developed eight sampling plans to estimate adult density or infestation level in grape clusters. We used 49 data sets collected from commercial vineyards in 2004 and 2005, in Minnesota and Wisconsin. Enumerative plans were developed using two precision levels (0.10 and 0.25); the six binomial plans reflected six unique action thresholds (3, 7, 12, 18, 22, and 31% of cluster samples infested with at least one H. axyridis). The spatial distribution of H. axyridis in wine grapes was aggregated, independent of cultivar and year, but it was more randomly distributed as mean density declined. The average sample number (ASN) for each sampling plan was determined using resampling software. For research purposes, an enumerative plan with a precision level of 0.10 (SE/X) resulted in a mean ASN of 546 clusters. For IPM applications, the enumerative plan with a precision level of 0.25 resulted in a mean ASN of 180 clusters. In contrast, the binomial plans resulted in much lower ASNs and provided high probabilities of arriving at correct "treat or no-treat" decisions, making these plans more efficient for IPM applications. For a tally threshold of one adult per cluster, the operating characteristic curves for the six action thresholds provided binomial sequential sampling plans with mean ASNs of only 19-26 clusters, and probabilities of making correct decisions between 83 and 96%. The benefits of the binomial sampling plans are discussed within the context of improving IPM programs for wine grapes.
Notification: Follow-up Audit of Prior OIG Recommendations on EPA's Workforce Management
October 16, 2012. The U.S. Environmental Protection Agency (EPA), Office of Inspector General (OIG), plans to begin audit work to evaluate the status of the Agency’s corrective actions for recommendations we made in 3 specific audit reports.
RFC: EPA's Action Plan for Bisphenol A Pursuant to EPA's Data Quality Guidelines
The American Chemistry Council (ACC) submits this Request for Correction to the U.S. Environmental Protection Agency under the Guidelines for Ensuring and Maximizing the Quality, Objectivity, Utility, and Integrity of Information Disseminated by the Environmental Protection Agency
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-04-01
Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Findlay, Rick
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tim Echelard
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less
24 CFR 1006.430 - Corrective and remedial action.
Code of Federal Regulations, 2011 CFR
2011-04-01
... plan; (3) Made substantial progress in carrying out its program and achieving its quantifiable goals as... to submit progress schedules for completing activities or complying with the requirements of the Act... appropriate technical assistance using existing grant funds or other available resources to overcome the...
40 CFR 63.548 - Monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... bag leak detection and corrective action plans for all baghouses (fabric filters) that are used to... the baghouse through visual inspection of the baghouse interior for air leaks. (8) Quarterly... operation of a bag leak detection system. (d) The procedures specified in the standard operating procedures...
42 CFR 410.143 - Requirements for approved accreditation organizations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 2 2014-10-01 2014-10-01 false Requirements for approved accreditation organizations. 410.143 Section 410.143 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF... decisions and any accreditation-related information that CMS may require (including corrective action plans...
Tiger Team Assessments seventeen through thirty-five: A summary and analysis. Volume 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-01
This report provides a summary and analysis of the Department of Energy`s (DOE`S) 19 Tiger Team Assessments that were conducted from October 1990 to July 1992. The sites are listed in the box below, along with their respective program offices and assessment completion dates. This analysis relied solely on the information contained in the Tiger Team Assessment Reports. The findings and concerns documented by the Tiger Teams provide a database of information about the then-current ES&H programs and practice. Program Secretarial Officers (PSOS) and field managers may use this information, along with other sources (such as the Corrective Action Plans,more » Progress Assessments, and Self-Assessments), to address the ES&H deficiencies found, prioritize and plan appropriate corrective actions, measure progress toward solving the problems, strengthen and transfer knowledge about areas where site performance exemplified the ES&H mindset, and so forth. Further analyses may be suggested by the analysis presented in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less
In this action, EPA limits the interstate transport of emissions of nitrogen oxides (NOX) and sulfur dioxide (SO2) that contribute to harmful levels of fine particle matter (PM2.5) and ozone in downwind states.
AT&T: "Apologies Are Not Enough."
ERIC Educational Resources Information Center
Benoit, William L.; Brinson, Susan L.
1994-01-01
Describes AT&T's long distance service interruption in New York on September 17, 1991, as a serious threat to its corporate image. Analyzes the advertising actions taken by AT&T to restore its image. Discusses three primary strategies developed in the advertising: mortification, plans for correction, and bolstering. (HB)
7 CFR 276.4 - Suspension/disallowance of administrative funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... System reviews, Federal reviews, audits, investigations, corrective action plans, financial management... inefficient or ineffective if the State agency fails to comply with the food stamp requirements established by... ineffective, FNS may warn the State agency that a suspension and/or disallowance of administrative funds is...
Army Task Force on Behavioral Health: Corrective Action Plan
2013-01-01
Veterans Affairs Legal Section KNOWLEDGE MGMT SECTION • KMO • CAA Analyst Figure I-1. Task Force Organization. ACRONYM Key ASA(M&RA): Assistant...Army Audit Agency OTIG: Office of the Inspector General OTSG: Office of the Surgeon General KMO : Knowledge Management Officer CAA: Center for
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-06-27
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
Geographic Unified Commands (GUCs): A Necessary Step Towards Achieving Unified Action
2009-10-23
in more than 150,000 dead or missing, and millions more homeless by the end of the first day17. The enormity of the crisis and lack of applicable... lacking appropriate representation), are never corrected and the ability to execute the plan is significantly impacted. Department of State and other...governmental agency planning organizations typically lack the depth of military personnel, with required joint expertise, that are needed to
Status and Plans for NSTX-U Recovery
NASA Astrophysics Data System (ADS)
Hawryluk, R. J.; Gerhardt, S.; Menard, J.; Neumeyer, C.
2017-10-01
The NSTX-U device experienced a series of technical problems; the most recent of which was the failure of one of the poloidal magnetic field coils, which has rendered the device inoperable and in need of significant repair. As a result of these incidents, the Laboratory performed a very comprehensive analysis of all of the systems on NSTX-U. Through an integrated system's analysis approach, this process identified which actions need to be taken to form a corrective action plan to ensure reliable and predictable operation. The actions required to address the deficiencies were reviewed by external experts who made recommendations on four high-level programmatic decisions regarding the inner poloidal field coils, limitations to the required bakeout temperature needed for conditioning of the vacuum vessel, divertor and wall protection tiles and coaxial helicity injection. The plans for addressing the recommendations from the external review panels will be presented. This research was sponsored by the U.S. Dept. of Energy under contract DE-AC02-09CH11466.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greg Ruskauff
2009-02-01
As prescribed in the Pahute Mesa Corrective Action Investigation Plan (CAIP) (DOE/NV, 1999) and Appendix VI of the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008), the ultimate goal of transport analysis is to develop stochastic predictions of a contaminant boundary at a specified level of uncertainty. However, because of the significant uncertainty of the model results, the primary goal of this report was modified through mutual agreement between the DOE and the State of Nevada to assess the primary model components that contribute to this uncertainty and to postpone defining the contaminant boundary until additionalmore » model refinement is completed. Therefore, the role of this analysis has been to understand the behavior of radionuclide migration in the Pahute Mesa (PM) Corrective Action Unit (CAU) model and to define, both qualitatively and quantitatively, the sensitivity of such behavior to (flow) model conceptualization and (flow and transport) parameterization.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-05
... DEPARTMENT OF AGRICULTURE Forest Service National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule; Correction AGENCY: USDA Forest Service. ACTION... for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1 (800) 877-8339 between 8...
Mass Deacidification Systems: Planning and Managerial Decision Making.
ERIC Educational Resources Information Center
Turko, Karen
Library administrators, faced with the problems of acid-paper deterioration, are examining mass deacidification procedures. Mass deacidification of acidic books while they are still physically sound and not yet brittle is the most cost-effective corrective action to extend the life of the paper. There are currently at least five mass…
20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... substantiates serious management, fiscal and/or performance problems, information from the Inspector General or gained through incident reports of poor performance, serious administrative problems and/or inability to... termination: (1) Poor performance and inability to meet Federal standards related to such debt collection...
49 CFR 195.56 - Filing safety-related condition reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operator. (2) Date of report. (3) Name, job title, and business telephone number of person submitting the report. (4) Name, job title, and business telephone number of person who determined that the condition... planned follow-up or future corrective action, including the anticipated schedule for starting and...
45 CFR 400.58 - Content and submission of public/private RCA plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES REFUGEE... services; (6) A description of the procedures to be used to ensure appropriate protections and due process for refugees, such as the correction of underpayments, notice of adverse action and the right to...
23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and increase skills of minority and female employees and applicants for employment. Commitment: We... minority employees have not been contacted for recruitment purposes. Commitment: We have developed a system... apprentices and trainees will be minorities and 15 percent will be female. In addition to the commitment made...
Quality Control Study of the GSL Reinsurance System. Final Report.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
A quality control plan for the U.S. Department of Education's Guaranteed Student Loan (GSL) reinsurance process was developed. To identify existing errors, systems documentation and past analyses of the reinsurance system were analyzed, and interviews were conducted. Corrective actions were proposed, and a quality control checklist was developed…
78 FR 52838 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... Maintenance Planning Data (MPD) Document. Repeat the test thereafter at intervals not to exceed 7,500 flight... by loss of fuel system suction feed capability on one engine, and in-flight shutdown of the engine...-101, before further flight, perform all related testing and corrective actions, and repeat the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham and Sam Marutzky
2011-07-01
This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flatmore » CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).« less
Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-01-01
This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG-1232 in April 1989. Supplement 1 of Volume 3 of NUREG-1232 (SSER 1) was published in October 1989. Like its predecessors, SSER 2 is composed of numerous safety evaluations by the staff regarding specific elements contained in the Browns Ferry Nuclear Performance Plan (BFNPP), Volume 3 (up to and including Revision 2), submitted by the Tennessee Valley Authority (TVA) for the Browns Ferry Nuclear Plant (BFN).more » The Browns Ferry Nuclear Plant consists of three boiling-water reactors (BWRs) at a site in Limestone County, Alabama. The BFNPP describes the corrective action plans and commitments made by TVA to resolve deficiencies with its nuclear programs before the startup of Unit 2. The staff has inspected and will continue to inspect TVA's implementation of these BFNPP corrective action plans that address staff concerns about TVA's nuclear program. SSER 2 documents the NRC staff's safety evaluations and conclusions for those elements of the BFNPP that were not previously addressed by the staff or that remained open as a result of unresolved issues identified by the staff in previous SERs and inspections.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks contain trichloroethane and 1,4-dichlorobenzene above ''Resource Conservation and Recovery Act'' toxicity characteristic limits. Based on the evaluation of analytical data from the CAI, review of future and current operations at the eight CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 151. No Further Action is the recommended corrective action for soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 18-03-01, and 18-99-09; and Lagoons C, D, F, and G of CAS 12-03-01. No Further Action with implementation of a best management practice (BMP) is recommended for soils at CAS 12-47-01 and Lagoons B and E of CAS 12-03-01. To be protective of future workers should the present scenario used to calculate FALs change, an administrative use restriction will be recorded per the FFACO agreement as a BMP. Close in Place with Administrative Controls is the recommended corrective action for Lagoon A of CAS 12-03-01. Based on the evaluation of analytical data from the CAI; review of future and current operations at CASs 12-04-01, 12-04-02, and 12-04-03; and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for the septic tanks at these CASs. No Further Action with implementation of BMPs is the recommended corrective action for septic tanks that do not contain potential source material from CAS 12-04-01, System No.4 (four tanks); CAS 12-04-02, System No.5 (six tanks); and CAS 12-04-03, System No.3 (four tanks). Clean Closure with implementation of BMPs is the recommended corrective action for the septic tanks from CAS 12-04-01, System No.1 (two tanks). The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 151.« less
Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shannon Parsons
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less
40 CFR 281.35 - Release response and corrective action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for soil...
40 CFR 281.35 - Release response and corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for soil...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-21
... Matter and Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is...: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8... ) and sulfur dioxide (SO 2 ) that contribute harmful levels of fine particle matter and ozone in...
Early Retirement Is Not the Cat's Meow. The Endpaper.
ERIC Educational Resources Information Center
Ferguson, Wayne S.
1982-01-01
Early retirement plans are perceived as being beneficial to school staff and financially advantageous to schools. Four out of the five assumptions on which these perceptions are based are incorrect. The one correct assumption is that early retirement will make affirmative action programs move ahead more rapidly. The incorrect assumptions are: (1)…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies... on the proposal. The FDIC hereby gives notice of its plan to submit to OMB a request to approve... Corrective Action (77 FR 52792); Regulatory Capital Rules: Standardized Approach for Risk-Weighted Assets...
78 FR 16046 - Proposed Collection; Comment Request for Notice 2010-6
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Notice 2010-6 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Notice 2010-6, Relief and Guidance on Corrections of Certain Failures of a Nonqualified Deferred... Compensation Plan to Comply with Section 409A(a). OMB Number: 1545-2164. Notice Number: Notice 2010-6 Abstract...
ERIC Educational Resources Information Center
Beauvois, Jean-Leon; Depret, Eric
2008-01-01
We focus on three aspects of the articles of Reyna, of Perry, Stupnisky, Daniels and Haynes, and of Murdock, Beauchamp and Hinton. The first aspect is the logic of causal chain, a logic that we differentiate from a more deterministic approach. The second one is the mode of corrective action (attribution retraining) that is planned for students,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [FDMS Docket No. EPA-R03-OAR-2011-0511; FRL-9609-1... Maintenance Areas; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule..., Parkersburg, Weirton, and Wheeling 8-hour ozone maintenance areas. The previous rulemaking amended the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-01
... Docket No. 06-150; FCC 12-61] 4.9 GHz Band AGENCY: Federal Communications Commission. ACTION: Final rule... that exempted 4940-4990 MHz (4.9 GHz) band applicants from certified frequency coordination. Next, the Commission corrects the bandwidth of Channel 14 in the 4.9 GHz band plan from five megahertz to one megahertz...
78 FR 14722 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... capability on one engine, and in-flight shutdown of the engine. This action revises that NPRM by proposing to... maintenance planning data (MPD) document. We are proposing this supplemental NPRM to detect and correct... feed system, followed by loss of fuel system suction feed capability on one engine, and in-flight...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
..., where ArcelorMittal is located. Emission inventories and modeling parameters had improved, and through...; therefore, this corrective action has no impact on the approved SIP or the modeling conducted to support it... gas combustion that were used in the modeling to demonstrate attainment. The flares were not...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
... proposed rule change is to correct Rule 616 to correspond to amended Equity Floor Procedure Advice (``EFPA'') A-7 and Options Floor Procedure Advice (``OFPA'') F-34 (together, the ``Advices'').\\5\\ \\5\\ The... plans for the abbreviated reporting of minor disciplinary infractions. Any disciplinary action taken by...
40 CFR 281.35 - Release response and corrective action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for soil...
40 CFR 281.35 - Release response and corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for soil...
Kennedy Space Center Press Site (SWMU 074) Interim Measure Report
NASA Technical Reports Server (NTRS)
Applegate, Joseph L.
2015-01-01
This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).
2004-07-01
sampler, project manager, data reviewer, statistician , risk assessor, assessment personnel, and laboratory QC manager. In addition, a complete copy of...sample • Corrective actions to be taken if the QC sample fails these criteria • A description of how the QC data and results are to be documented and...Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Evaluating, Assessing, and Documenting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Kauss
2011-06-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-07-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2013 CFR
2013-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2010 CFR
2010-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2014 CFR
2014-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2011 CFR
2011-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
42 CFR 460.194 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...
42 CFR 460.194 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...
Plans, Habits, and Theory of Mind.
Gershman, Samuel J; Gerstenberg, Tobias; Baker, Chris L; Cushman, Fiery A
2016-01-01
Human success and even survival depends on our ability to predict what others will do by guessing what they are thinking. If I accelerate, will he yield? If I propose, will she accept? If I confess, will they forgive? Psychologists call this capacity "theory of mind." According to current theories, we solve this problem by assuming that others are rational actors. That is, we assume that others design and execute efficient plans to achieve their goals, given their knowledge. But if this view is correct, then our theory of mind is startlingly incomplete. Human action is not always a product of rational planning, and we would be mistaken to always interpret others' behaviors as such. A wealth of evidence indicates that we often act habitually-a form of behavioral control that depends not on rational planning, but rather on a history of reinforcement. We aim to test whether the human theory of mind includes a theory of habitual action and to assess when and how it is deployed. In a series of studies, we show that human theory of mind is sensitive to factors influencing the balance between habitual and planned behavior.
Ajzen, Icek; Brown, Thomas C; Carvajal, Franklin
2004-09-01
An experiment was designed to account for intention-behavior discrepancies by applying the theory of planned behavior to contingent valuation. College students (N = 160) voted in hypothetical and real payment referenda to contribute $8 to a scholarship fund. Overestimates of willingness to pay in the hypothetical referendum could not be attributed to moderately favorable latent dispositions. Instead, this hypothetical bias was explained by activation of more favorable beliefs and attitudes in the context of a hypothetical rather than a real referendum. A corrective entreaty was found to eliminate this bias by bringing beliefs, attitudes, and intentions in line with those in the real payment situation. As a result, the theory of planned behavior produced more accurate prediction of real payment when participants were exposed to the corrective entreaty.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews; Christy Sloop
2012-02-01
Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred tomore » as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A. Because CAU 569 is a complicated site containing many types of releases, it was agreed during the data quality objectives (DQO) process that these sites will be grouped. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the DQOs developed on September 26, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 569. The presence and nature of contamination at CAU 569 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample locations to the dose-based final action level (FAL). The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. A field investigation will be performed to define any areas where TED exceeds the FAL and to determine whether contaminants of concern are present at the site from other potential releases. The presence and nature of contamination from other types of releases (e.g., excavation, migration, and any potential releases discovered during the investigation) will be evaluated using soil samples collected from biased locations indicating the highest levels of contamination. Appendix A provides a detailed discussion of the DQO methodology and the objectives specific to each study group.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Matter and Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Announcement of public hearing... Ozone'', which was signed on October 6, 2011 and posted on EPA's website on October 6, 2011. The hearing... Particulate Matter and Ozone and Correction of SIP Approvals). EPA is proposing to amend the assurance penalty...
42 CFR 424.535 - Revocation of enrollment and billing privileges in the Medicare program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... application applicable for its provider or supplier type, and has not submitted a plan of corrective action as... supplier is no longer operational to furnish Medicare covered items or services, or is not meeting Medicare... A provider is no longer operational to furnish Medicare covered items or services, or the provider...
40 CFR 49.24 - Federal Implementation Plan Provisions for Navajo Generating Station, Navajo Nation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... observations, and any corrective actions taken shall be noted in a log. (f) Reporting and recordkeeping... Environmental Protection Agency, P.O. Box 339, Window Rock, Arizona 86515, (928) 871 -7692, (928) 871-7996... Protection Agency, by mail to: P.O. Box 339, Window Rock, Arizona 86515, or by facsimile to: (928) 871-7996...
NASA Astrophysics Data System (ADS)
Sutrisno, Agung; Gunawan, Indra; Vanany, Iwan
2017-11-01
In spite of being integral part in risk - based quality improvement effort, studies improving quality of selection of corrective action priority using FMEA technique are still limited in literature. If any, none is considering robustness and risk in selecting competing improvement initiatives. This study proposed a theoretical model to select risk - based competing corrective action by considering robustness and risk of competing corrective actions. We incorporated the principle of robust design in counting the preference score among corrective action candidates. Along with considering cost and benefit of competing corrective actions, we also incorporate the risk and robustness of corrective actions. An example is provided to represent the applicability of the proposed model.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2016-05-01
The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31more » (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krenzien, Susan
2015-01-01
This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities from October 1, 2013, through September 30, 2014 (fiscal year [FY] 2014). All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); National Security Technologies, LLC (NSTec); Navarro-Intera, LLC (N-I); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2014. The activities included conducting oversight assessments for QAP compliance, identifying findings and completing corrective actions, evaluating laboratory performance,more » and publishing documents. UGTA Activity participants conducted 25 assessments on topics including safe operations, QAP compliance, activity planning, and sampling. These assessments are summarized in Section 2.0. Corrective actions tracked in FY 2014 are presented in Appendix A. Laboratory performance was evaluated based on three approaches: (1) established performance evaluation programs (PEPs), (2) interlaboratory comparisons, or (3) data review. The results of the laboratory performance evaluations, and interlaboratory comparison results are summarized in Section 4.0. The UGTA Activity published three public documents and a variety of other publications in FY 2014. The titles, dates, and main authors are identified in Section 5.0. The Contract Managers, Corrective Action Unit (CAU) Leads, Preemptive Review (PER) Committee members, and Topical Committee members are listed by name and organization in Section 6.0. Other activities that affected UGTA quality are discussed in Section 7.0. Section 8.0 provides the FY 2014 UGTA QA program conclusions, and Section 9.0 lists the references not identified in Section 5.0.« less
Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070
NASA Technical Reports Server (NTRS)
Wilson, Deborah M.; Miller, Ralinda R.
2015-01-01
The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding ``good cause.... EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
...'' exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding ``good cause.... EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date...
Report #15-P-0298, September 28, 2015. Due to a Notice of Non-Compliance issued to the Hawaii DOH and lack of adequate progress on a corrective action plan, the EPA should withhold about $8.8 million in FY 2015 DWSRF capitalization grant funds.
The Major Project in the Field of Education in the Latin American and Caribbean Region. Bulletin 4.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and Caribbean.
The initiative and activities carried out by 29 countries in Latin and South America and the Caribbean in the UNESCO Major Project in the Field of Education to correct deficiencies and meet unsatisfied basic educational needs are summarized. Many summaries reflect revisions made during 1983 in National Plans of Action with respect to enhancing…
National Congress on Rural Education Proceedings (1st, Traverse City, Michigan, October 11, 1992).
ERIC Educational Resources Information Center
Gregory, Leonard, Comp.
The first National Congress on Rural Education, organized and conducted in conjunction with the 84th annual convention of the National Rural Education Association, convened an assembly of 458 advocates of rural education which came together to analyze common problems that tend to disaffect education in rural America and to plan corrective action.…
Taylor, C; Parker, J; Stratford, J; Warren, M
2018-05-01
Although all systematic and random positional setup errors can be corrected for in entirety during on-line image-guided radiotherapy, the use of a specified action level, below which no correction occurs, is also an option. The following service evaluation aimed to investigate the use of this 3 mm action level for on-line image assessment and correction (online, systematic set-up error and weekly evaluation) for lower extremity sarcoma, and understand the impact on imaging frequency and patient positioning error within one cancer centre. All patients were immobilised using a thermoplastic shell attached to a plastic base and an individual moulded footrest. A retrospective analysis of 30 patients was performed. Patient setup and correctional data derived from cone beam CT analysis was retrieved. The timing, frequency and magnitude of corrections were evaluated. The population systematic and random error was derived. 20% of patients had no systematic corrections over the duration of treatment, and 47% had one. The maximum number of systematic corrections per course of radiotherapy was 4, which occurred for 2 patients. 34% of episodes occurred within the first 5 fractions. All patients had at least one observed translational error during their treatment greater than 0.3 cm, and 80% of patients had at least one observed translational error during their treatment greater than 0.5 cm. The population systematic error was 0.14 cm, 0.10 cm, 0.14 cm and random error was 0.27 cm, 0.22 cm, 0.23 cm in the lateral, caudocranial and anteroposterial directions. The required Planning Target Volume margin for the study population was 0.55 cm, 0.41 cm and 0.50 cm in the lateral, caudocranial and anteroposterial directions. The 3 mm action level for image assessment and correction prior to delivery reduced the imaging burden and focussed intervention on patients that exhibited greater positional variability. This strategy could be an efficient deployment of departmental resources if full daily correction of positional setup error is not possible. Copyright © 2017. Published by Elsevier Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
Family planning services for incarcerated women: models for filling an unmet need.
Sufrin, Carolyn; Baird, Sara; Clarke, Jennifer; Feldman, Elizabeth
2017-03-13
Purpose Incarcerated women around the globe are predominantly of reproductive age. Most of these women have been pregnant before, and many want to be sexually active and avoid pregnancy upon release. Yet few of these women are on a regular method of contraception. Providing contraceptive services for women in custody benefits individual and public health goals of reducing unintended pregnancy. This policy briefing reviews evidence for an unmet need for family planning in the correctional setting, and policy implications for expanding services. The paper aims to discuss these issues. Design/methodology/approach The authors describe four model programs in the USA with established contraceptive services on site, highlighting practical steps other facilities can implement. Findings Correctional facilities health administrators, providers, advocates, and legislators should advance policies which should counsel women on family planning and should make a range of contraceptive methods available before release, while remaining sensitive to the potential pressure these women may feel to use birth control in this unique environment. Practical implications Family planning services for incarcerated women benefits individuals, facilities, and the community. Social implications Policies which enable correctional facilities to provide comprehensive family planning to incarcerated women - including reproductive life goals counseling and contraceptive method provision - promote equity in access to critical reproductive health services and also provide broad scale population level benefits in preventing unintended pregnancy or enabling counseling for healthy pregnancies for a group of women who often have limited access to such services. Originality/value This policy briefing highlights an area of health care in prisons and jails which gets little attention in research and in policy circles: family planning services for incarcerated women. In addition to reviewing the importance of such services for this population, the authors also highlight model family planning programs in correctional facilities. These provide actionable insights for other administrators and providers.
Intelligent monitoring and control of semiconductor manufacturing equipment
NASA Technical Reports Server (NTRS)
Murdock, Janet L.; Hayes-Roth, Barbara
1991-01-01
The use of AI methods to monitor and control semiconductor fabrication in a state-of-the-art manufacturing environment called the Rapid Thermal Multiprocessor is described. Semiconductor fabrication involves many complex processing steps with limited opportunities to measure process and product properties. By applying additional process and product knowledge to that limited data, AI methods augment classical control methods by detecting abnormalities and trends, predicting failures, diagnosing, planning corrective action sequences, explaining diagnoses or predictions, and reacting to anomalous conditions that classical control systems typically would not correct. Research methodology and issues are discussed, and two diagnosis scenarios are examined.
Robot learning and error correction
NASA Technical Reports Server (NTRS)
Friedman, L.
1977-01-01
A model of robot learning is described that associates previously unknown perceptions with the sensed known consequences of robot actions. For these actions, both the categories of outcomes and the corresponding sensory patterns are incorporated in a knowledge base by the system designer. Thus the robot is able to predict the outcome of an action and compare the expectation with the experience. New knowledge about what to expect in the world may then be incorporated by the robot in a pre-existing structure whether it detects accordance or discrepancy between a predicted consequence and experience. Errors committed during plan execution are detected by the same type of comparison process and learning may be applied to avoiding the errors.
Markert, H; Kaufmann, U; Kara Kayikci, Z; Palm, G
2009-03-01
Language understanding is a long-standing problem in computer science. However, the human brain is capable of processing complex languages with seemingly no difficulties. This paper shows a model for language understanding using biologically plausible neural networks composed of associative memories. The model is able to deal with ambiguities on the single word and grammatical level. The language system is embedded into a robot in order to demonstrate the correct semantical understanding of the input sentences by letting the robot perform corresponding actions. For that purpose, a simple neural action planning system has been combined with neural networks for visual object recognition and visual attention control mechanisms.
45 CFR 1225.19 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...
45 CFR 1225.19 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...
Priority scheme planning for the robust SSM/PMAD testbed
NASA Technical Reports Server (NTRS)
Elges, Michael R.; Ashworth, Barry R.
1991-01-01
Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.
9 CFR 416.15 - Corrective Actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective action(s) when either the establishment or FSIS determines that the establishment's Sanitation SOP's or...
DOUBLE TRACKS Test Site interim corrective action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2004-04-01
This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-12-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less
Plans, Habits, and Theory of Mind
Baker, Chris L.; Cushman, Fiery A.
2016-01-01
Human success and even survival depends on our ability to predict what others will do by guessing what they are thinking. If I accelerate, will he yield? If I propose, will she accept? If I confess, will they forgive? Psychologists call this capacity “theory of mind.” According to current theories, we solve this problem by assuming that others are rational actors. That is, we assume that others design and execute efficient plans to achieve their goals, given their knowledge. But if this view is correct, then our theory of mind is startlingly incomplete. Human action is not always a product of rational planning, and we would be mistaken to always interpret others’ behaviors as such. A wealth of evidence indicates that we often act habitually—a form of behavioral control that depends not on rational planning, but rather on a history of reinforcement. We aim to test whether the human theory of mind includes a theory of habitual action and to assess when and how it is deployed. In a series of studies, we show that human theory of mind is sensitive to factors influencing the balance between habitual and planned behavior. PMID:27584041
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark McLane
2005-03-01
This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for CAU 383.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chesneau, H.L.; Passman, F.J.; Daniels, D.
1995-05-01
Responding to feed-back from its retail outlet network, a major, vertically integrated petroleum company undertook to diagnose and remediate diesel and gasoline performance problems. Analysis of samples from tanks at refinery, distribution terminal and retail outlet sites established that uncontrolled microbial contamination was rampant throughout the distribution system. The company then developed and instituted a two-phase action plan. During Phase I, all tanks received corrective (shock) biocide treatment preceding mechanical tank cleaning and fuel polishing. An ongoing Phase II program currently includes routine sampling and analysis combined with periodic preventive biocide treatment. This paper describes the initial problem diagnosis, correctivemore » action plan and preventive program; recommending the Phase II program as a model for all companies involved with refining, distribution or retailing gasoline.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahmed Hassan
2004-09-01
The groundwater flow and radionuclide transport model characterizing the Shoal underground nuclear test has been accepted by the State of Nevada Division of Environmental Protection. According to the Federal Facility Agreement and Consent Order (FFACO) between DOE and the State of Nevada, the next steps in the closure process for the site are then model validation (or postaudit), the proof-of-concept, and the long-term monitoring stage. This report addresses the development of the validation strategy for the Shoal model, needed for preparing the subsurface Corrective Action Decision Document-Corrective Action Plan and the development of the proof-of-concept tools needed during the five-yearmore » monitoring/validation period. The approach builds on a previous model, but is adapted and modified to the site-specific conditions and challenges of the Shoal site.« less
Participatory action research in corrections: The HITEC 2 program.
Cherniack, Martin; Dussetschleger, Jeffrey; Dugan, Alicia; Farr, Dana; Namazi, Sara; El Ghaziri, Mazen; Henning, Robert
2016-03-01
HITEC 2 (Health Improvement through Employee Control 2) is the follow-up to HITEC, a participatory action research (PAR) program that integrates health and work conditions interventions designed by the workforce. HITEC 2 compares intervention programs between two correctional sites, one using a pure workforce level design team and the other using a more structured and time delineated labor-management kaizen effectiveness team. HITEC 2 utilizes a seven step participatory Intervention Design and Analysis Scorecard (IDEAS) for planning interventions. Consistent with PAR, process and intervention efficacy measures are developed and administered through workforce representation. Participation levels, robustness of participatory structures and sophistication of interventions have increased at each measured interval. Health comparisons between 2008 and 2013 showed increased hypertension, static weight maintenance, and increased 'readiness to change'. The PAR approaches are robust and sustained. Their long-term effectiveness in this population is not yet clear. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.
Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document /Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 482 U15a/e Muckpiles and Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 482 is comprised of three Corrective Action Sites (CASs) and one adjacent area: CAS 15-06-01, U15e Muckpile; CAS 15-06-02, U15a Muckpile; CAS 15-38-01, Area 15 U15a/e Ponds; and Drainage below the U15a Muckpile. The purpose of thismore » CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further corrective action, by placing use restrictions on the three CASs and the adjacent area of CAU 482. To support this recommendation, a corrective action investigation (CAI) was performed in September 2002. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to determine appropriate corrective actions. The CAU 482 dataset from the CAI was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Tier 2 FALS were determined for the hazardous constituents of total petroleum hydrocarbons (TPH)-diesel-range organics (DRO) and the radionuclides americium (Am)-241, cesium (Cs)-137, plutonium (Pu)-238, and Pu-239. The Tier 2 FALs were calculated for the radionuclides using site-specific information. The hazardous constituents of TPH-DRO were compared to the PALs defined in the CAIP, and because none of the preliminary action levels (PALs) were exceeded, the PALs became the FALs. The radionuclide FALs were calculated using the Residual Radioactive (RESRAD) code (version 6.21). The RESRAD calculation determined the activities of all radionuclides that together would sum to an exposure dose of 25 millirem per year to a site receptor (based on their relative abundances at each CAS). Based on the field investigation, the following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) CAS 15-06-01 - None. (2) CAS 15-06-02 - Cs-137 and Pu-239. (3) CAS 15-38-01 - Am-241, Cs-137, Pu-238, and Pu-239. (4) Drainage below CAS 15-06-02 - Cs-137 and Pu-239. Based on the data and risk evaluations, the DQO data needs presented in the Corrective Action Investigation Plan were met, and the data accurately represent the radiological and chemical risk present at CAU 482. Based on the results of the CAI data evaluation, it was determined that closure in place with use restrictions is the appropriate corrective action for CAU 482 and that use restrictions will effectively control exposure to future land users. This is based on the fact that even though the FALs were exceeded in a few samples, this remote, controlled access site poses only limited risk overall to public health and the environment. Given the relatively low levels of contamination present, it would create a greater hazard to worker safety, public health, and the environment to remove the contamination, transport it, and bury it at another location. Therefore, DTRA provides the following recommendations: (1) Close COCs in place at CAS 15-06-02, CAS 15-38-01, and the drainage below CAS 15-06-02 with use restrictions. (2) No further action for CAU 482. (3) A Notice of Completion be issued to DTRA by the Nevada Division of Environmental Protection for closure of CAU 482. (4) Move CAU 482 from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Administrative Procedure Act (APA) which, upon finding ``good cause,'' authorizes agencies to dispense with... NAAQS into the Florida SIP. EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows...
ERIC Educational Resources Information Center
Bird, Fiona L.; Yucel, Robyn
2015-01-01
Effective feedback can build self-assessment skills in students so that they become more competent and confident to identify and self-correct weaknesses in their work. In this study, we trialled a feedback code as part of an integrated programme of formative and summative assessment tasks, which provided feedback to first-year students on their…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2010-04-01
Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Recordmore » of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls of the leach pit chamber and leach rock. The contamination present at CAS 06-05-03 within the leach pit was not feasible to remove. •The surface and subsurface soils within and surrounding the septic system at CAS 06-05-04 contained PCB concentrations above the FAL of 0.74 mg/kg. The lateral and vertical extent of COCs was determined for this CAS. Contaminated soils were removed up to within 18 ft of the building. The remaining contamination is confined to subsurface soils adjacent to and beneath Building CP-162 and was not feasible to remove. •The solid materials within the septic tank and soils immediately surrounding the inlet end of the tank at CAS 06-59-03 contained benzo(a)pyrene above the FAL of 0.21 mg/kg. The soils, tank contents, and tank were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. •The solids contained within the septic tank and inlet pipe at CAS 06-59-05 contained the following contaminants above their respective FALs: PCBs, arsenic, lead, benzo(a)pyrene, and pesticides. The tank and inlet pipe contents were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following corrective action recommendations: •No further action for CASs 03-51-01, 06-04-02, and 06-59-04, as no contaminants of potential concern were present that exceed FALs. •Closure in place for CAS 06-05-03 under a corrective action with a use restriction (UR) for remaining PCB- and arsenic-impacted potential source material (PSM). The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •Closure in place for CAS 06-05-04 under a corrective action with a UR for remaining PCBs in soil adjacent to and beneath Building CP-162. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •No further action for CAS 06-59-03, as the COC of benzo(a)pyrene in soil and PSM have been removed. •No further action for CAS 06-59-05, as the COCs in PSM within the septic tank and inlet piping have been removed and the tank was filled with concrete.« less
Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less
10 CFR 71.133 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...
10 CFR 71.133 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...
A strategic approach to employee retention.
Gering, John; Conner, John
2002-11-01
A sound retention strategy should incorporate a business plan, a value proposition, progress measures, and management influences. The business plan will indicate whether a healthcare organization will achieve a return on investment for its effort. A value proposition will showcase an organization's strengths and differentiate it from its competitors. Measuring progress toward meeting retention goals at regular intervals will help keep an organization on track. The best managers require accountability, rewarding employees for their successes and taking corrective action as necessary. Retention rate targets must be at a level that will achieve a competitive advantage in the served market.
DOE Office of Scientific and Technical Information (OSTI.GOV)
John McCord
2006-06-01
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Underground Test Area (UGTA) Project to assess and evaluate the effects of the underground nuclear weapons tests on groundwater beneath the Nevada Test Site (NTS) and vicinity. The framework for this evaluation is provided in Appendix VI, Revision No. 1 (December 7, 2000) of the Federal Facility Agreement and Consent Order (FFACO, 1996). Section 3.0 of Appendix VI ''Corrective Action Strategy'' of the FFACO describes the process that will be used to complete corrective actions specifically for the UGTA Project. The objective of themore » UGTA corrective action strategy is to define contaminant boundaries for each UGTA corrective action unit (CAU) where groundwater may have become contaminated from the underground nuclear weapons tests. The contaminant boundaries are determined based on modeling of groundwater flow and contaminant transport. A summary of the FFACO corrective action process and the UGTA corrective action strategy is provided in Section 1.5. The FFACO (1996) corrective action process for the Yucca Flat/Climax Mine CAU 97 was initiated with the Corrective Action Investigation Plan (CAIP) (DOE/NV, 2000a). The CAIP included a review of existing data on the CAU and proposed a set of data collection activities to collect additional characterization data. These recommendations were based on a value of information analysis (VOIA) (IT, 1999), which evaluated the value of different possible data collection activities, with respect to reduction in uncertainty of the contaminant boundary, through simplified transport modeling. The Yucca Flat/Climax Mine CAIP identifies a three-step model development process to evaluate the impact of underground nuclear testing on groundwater to determine a contaminant boundary (DOE/NV, 2000a). The three steps are as follows: (1) Data compilation and analysis that provides the necessary modeling data that is completed in two parts: the first addressing the groundwater flow model, and the second the transport model. (2) Development of a groundwater flow model. (3) Development of a groundwater transport model. This report presents the results of the first part of the first step, documenting the data compilation, evaluation, and analysis for the groundwater flow model. The second part, documentation of transport model data will be the subject of a separate report. The purpose of this document is to present the compilation and evaluation of the available hydrologic data and information relevant to the development of the Yucca Flat/Climax Mine CAU groundwater flow model, which is a fundamental tool in the prediction of the extent of contaminant migration. Where appropriate, data and information documented elsewhere are summarized with reference to the complete documentation. The specific task objectives for hydrologic data documentation are as follows: (1) Identify and compile available hydrologic data and supporting information required to develop and validate the groundwater flow model for the Yucca Flat/Climax Mine CAU. (2) Assess the quality of the data and associated documentation, and assign qualifiers to denote levels of quality. (3) Analyze the data to derive expected values or spatial distributions and estimates of the associated uncertainty and variability.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Takahashi, R; Kamima, T; Tachibana, H
2015-06-15
Purpose: To show the results of a multi-institutional study of the independent dose verification for conventional, Stereotactic radiosurgery and body radiotherapy (SRS and SBRT) plans based on the action level of AAPM TG-114. Methods: This study was performed at 12 institutions in Japan. To eliminate the bias of independent dose verification program (Indp), all of the institutions used the same CT-based independent dose verification software (Simple MU Analysis, Triangle Products, JP) with the Clarkson-based algorithm. Eclipse (AAA, PBC), Pinnacle{sup 3} (Adaptive Convolve) and Xio (Superposition) were used as treatment planning system (TPS). The confidence limits (CL, Mean±2SD) for 18 sitesmore » (head, breast, lung, pelvis, etc.) were evaluated in comparison in dose between the TPS and the Indp. Results: A retrospective analysis of 6352 treatment fields was conducted. The CLs for conventional, SRS and SBRT were 1.0±3.7 %, 2.0±2.5 % and 6.2±4.4 %, respectively. In conventional plans, most of the sites showed within 5 % of TG-114 action level. However, there were the systematic difference (4.0±4.0 % and 2.5±5.8 % for breast and lung, respectively). In SRS plans, our results showed good agreement compared to the action level. In SBRT plans, the discrepancy between the Indp was variable depending on dose calculation algorithms of TPS. Conclusion: The impact of dose calculation algorithms for the TPS and the Indp affects the action level. It is effective to set the site-specific tolerances, especially for the site where inhomogeneous correction can affect dose distribution strongly.« less
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...
42 CFR 431.246 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...
16 CFR 1209.37 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Corrective actions. 1209.37 Section 1209.37... SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure. When any test required by § 1209.36 yields failing or unacceptable results, corrective action must be...
42 CFR 431.246 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-05
...EPA is proposing to approve revisions to the North Dakota State Implementation Plan that the Governor of North Dakota submitted with a letter dated April 6, 2009. The revisions affect North Dakota's air pollution control rules regarding general provisions (including rules regarding shutdowns and malfunctions), ambient air quality standards, emissions of particulate matter, permitting, and fees. In addition, EPA is proposing administrative corrections to the regulatory text for North Dakota that will be codified in the Code of Federal Regulations; we made errors in the identification of plan table when we approved the North Dakota State Implementation Plan revisions for Interstate Transport of pollution, which the Governor also submitted on April 6, 2009. This action is being taken under section 110 of the Clean Air Act.
Fitts’ Law in Early Postural Adjustments
Bertucco, M.; Cesari, P.; Latash, M.L
2012-01-01
We tested a hypothesis that the classical relation between movement time and index of difficulty (ID) in quick pointing action (Fitts’ Law) reflects processes at the level of motor planning. Healthy subjects stood on a force platform and performed quick and accurate hand movements into targets of different size located at two distances. The movements were associated with early postural adjustments that are assumed to reflect motor planning processes. The short distance did not require trunk rotation, while the long distance did. As a result, movements over the long distance were associated with substantiual Coriolis forces. Movement kinematics and contact forces and moments recorded by the platform were studied. Movement time scaled with ID for both movements. However, the data could not be fitted with a single regression: Movements over the long distance had a larger intercept corresponding to movement times about 140 ms longer than movements over the shorter distance. The magnitude of postural adjustments prior to movement initiation scaled with ID for both short and long distances. Our results provide strong support for the hypothesis that Fitts’ Law emerges at the level of motor planning, not at the level of corrections of ongoing movements. They show that, during natural movements, changes in movement distance may lead to changes in the relation between movement time and ID, for example when the contribution of different body segments to the movement varies and when the action of Coriolis force may require an additional correction of the movement trajectory. PMID:23211560
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kidman, Raymond; Matthews, Patrick
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 192.04 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...
21 CFR 123.7 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 123.7 Section 123.7 Food and... CONSUMPTION FISH AND FISHERY PRODUCTS General Provisions § 123.7 Corrective actions. (a) Whenever a deviation from a critical limit occurs, a processor shall take corrective action either by: (1) Following a...
10 CFR 72.172 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
34 CFR 200.42 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 1 2011-07-01 2011-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...
10 CFR 72.172 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...
34 CFR 200.42 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
40 CFR 192.04 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...
5 CFR 930.113 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...
5 CFR 930.113 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sloop, Christy
2013-04-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less
Method and system for providing work machine multi-functional user interface
Hoff, Brian D [Peoria, IL; Akasam, Sivaprasad [Peoria, IL; Baker, Thomas M [Peoria, IL
2007-07-10
A method is performed to provide a multi-functional user interface on a work machine for displaying suggested corrective action. The process includes receiving status information associated with the work machine and analyzing the status information to determine an abnormal condition. The process also includes displaying a warning message on the display device indicating the abnormal condition and determining one or more corrective actions to handle the abnormal condition. Further, the process includes determining an appropriate corrective action among the one or more corrective actions and displaying a recommendation message on the display device reflecting the appropriate corrective action. The process may also include displaying a list including the remaining one or more corrective actions on the display device to provide alternative actions to an operator.
SU-F-T-67: Correction Factors for Monitor Unit Verification of Clinical Electron Beams
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haywood, J
Purpose: Monitor units calculated by electron Monte Carlo treatment planning systems are often higher than TG-71 hand calculations for a majority of patients. Here I’ve calculated tables of geometry and heterogeneity correction factors for correcting electron hand calculations. Method: A flat water phantom with spherical volumes having radii ranging from 3 to 15 cm was created. The spheres were centered with respect to the flat water phantom, and all shapes shared a surface at 100 cm SSD. D{sub max} dose at 100 cm SSD was calculated for each cone and energy on the flat phantom and for the spherical volumesmore » in the absence of the flat phantom. The ratio of dose in the sphere to dose in the flat phantom defined the geometrical correction factor. The heterogeneity factors were then calculated from the unrestricted collisional stopping power for tissues encountered in electron beam treatments. These factors were then used in patient second check calculations. Patient curvature was estimated by the largest sphere that aligns to the patient contour, and appropriate tissue density was read from the physical properties provided by the CT. The resulting MU were compared to those calculated by the treatment planning system and TG-71 hand calculations. Results: The geometry and heterogeneity correction factors range from ∼(0.8–1.0) and ∼(0.9–1.01) respectively for the energies and cones presented. Percent differences for TG-71 hand calculations drop from ∼(3–14)% to ∼(0–2)%. Conclusion: Monitor units calculated with the correction factors typically decrease the percent difference to under actionable levels, < 5%. While these correction factors work for a majority of patients, there are some patient anatomies that do not fit the assumptions made. Using these factors in hand calculations is a first step in bringing the verification monitor units into agreement with the treatment planning system MU.« less
Code of Federal Regulations, 2013 CFR
2013-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2012 CFR
2012-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2010 CFR
2010-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2014 CFR
2014-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Ideational apraxia in Parkinson disease.
Qureshi, Mohammad; Williamson, John B; Heilman, Kenneth M
2011-09-01
: The objective of the study was to determine whether ideational apraxia (IA), a loss of ability to plan the sequence of actions needed to achieve a goal, is associated with Parkinson disease (PD). : The frontal lobes play an important role in planning and sequencing, and many patients with PD have frontal lobe dysfunction. : Ten right-handed patients with PD and 10 right-handed neurologically and psychiatrically healthy people participated. To assess for IA, participants were given sets of pictures that showed the steps in completing a task, but the steps were shown out of order. The participants were required to point to the pictures in the correct sequence to complete each task. The participants also performed a control task of sequencing randomly arranged printed single words to create a sentence that described an accompanying picture. : The patients with PD performed more poorly than the controls on the action-sequencing tasks (P<0.05). Errors were predominantly in sequencing rather than repetition or omission, indicating that the poor performance was not caused by perseveration. There were no group differences in the task of sequencing words to make a sentence. : These results indicate that patients with PD do have IA, an action-sequence planning deficit. Further research is needed to better understand mechanisms, ecological implications, and potential treatments.
45 CFR 305.66 - Notice, corrective action year, and imposition of penalty.
Code of Federal Regulations, 2010 CFR
2010-10-01
... deficiency or deficiencies cited in the notice during the automatic corrective action year (i.e., the... corrected the deficiency or deficiencies cited in the notice by the end of the corrective action year. (d... which the penalty is assessed and which failed to correct the deficiency or deficiencies cited in the...
Zoonoses action plan Salmonella monitoring programme: an investigation of the sampling protocol.
Snary, E L; Munday, D K; Arnold, M E; Cook, A J C
2010-03-01
The Zoonoses Action Plan (ZAP) Salmonella Programme was established by the British Pig Executive to monitor Salmonella prevalence in quality-assured British pigs at slaughter by testing a sample of pigs with a meat juice enzyme-linked immunosorbent assay for antibodies against group B and C(1) Salmonella. Farms were assigned a ZAP level (1 to 3) depending on the monitored prevalence, and ZAP 2 or 3 farms were required to act to reduce the prevalence. The ultimate goal was to reduce the risk of human salmonellosis attributable to British pork. A mathematical model has been developed to describe the ZAP sampling protocol. Results show that the probability of assigning a farm the correct ZAP level was high, except for farms that had a seroprevalence close to the cutoff points between different ZAP levels. Sensitivity analyses identified that the probability of assigning a farm to the correct ZAP level was dependent on the sensitivity and specificity of the test, the number of batches taken to slaughter each quarter, and the number of samples taken per batch. The variability of the predicted seroprevalence was reduced as the number of batches or samples increased and, away from the cutoff points, the probability of being assigned the correct ZAP level increased as the number of batches or samples increased. In summary, the model described here provided invaluable insight into the ZAP sampling protocol. Further work is required to understand the impact of the program for Salmonella infection in British pig farms and therefore on human health.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCord, John; Marutzky, Sam
2004-12-01
This Corrective Action Investigation Plan (CAIP) was developed for Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain. The CAIP is a requirement of the ''Federal Facility Agreement and Consent Order'' (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD) (FFACO, 1996). The FFACO addresses environmental restoration activities at U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) facilities and sites including the underground testing area(s) of the Nevada Test Site (NTS). This CAIP describes the investigation activities currently planned for the Rainier Mesa/Shoshone Mountain CAU.more » These activities are consistent with the current Underground Test Area (UGTA) Project strategy described in Section 3.0 of Appendix VI, Revision No. 1 (December 7, 2000) of the FFACO (1996) and summarized in Section 2.1.2 of this plan. The Rainier Mesa/Shoshone Mountain CAU extends over several areas of the NTS (Figure 1-1) and includes former underground nuclear testing locations in Areas 12 and 16. The area referred to as ''Rainier Mesa'' includes the geographical area of Rainier Mesa proper and the contiguous Aqueduct Mesa. Figure 1-2 shows the locations of the tests (within tunnel complexes) conducted at Rainier Mesa. Shoshone Mountain is located approximately 20 kilometers (km) south of Rainier Mesa, but is included within the same CAU due to similarities in their geologic setting and in the nature and types of nuclear tests conducted. Figure 1-3 shows the locations of the tests conducted at Shoshone Mountain. The Rainier Mesa/Shoshone Mountain CAU falls within the larger-scale Rainier Mesa/Shoshone Mountain Investigation Area, which also includes the northwest section of the Yucca Flat CAU as shown in Figure 1-1. Rainier Mesa and Shoshone Mountain lie adjacent to the Timber Mountain Caldera Complex and are composed of volcanic rocks that erupted from the caldera as well as from more distant sources. This has resulted in a layered volcanic stratigraphy composed of thick deposits of welded and nonwelded ash-flow tuff and lava flows. These deposits are proximal to the source caldera and are interstratified with the more distal facies of fallout tephra and bedded reworked tuff from more distant sources. In each area, a similar volcanic sequence was deposited upon Paleozoic carbonate and siliciclastic rocks that are disrupted by various thrust faults, normal faults, and strike-slip faults. In both Rainier Mesa (km) to the southwest, and Tippipah Spring, 4 km to the north, and the tunnel complex is dry. Particle-tracking simulations performed during the value of information analysis (VOIA) (SNJV, 2004b) indicate that most of the regional groundwater that underlies the test locations at Rainier Mesa and Shoshone Mountain eventually follows similar and parallel paths and ultimately discharges in Death Valley and the Amargosa Desert. Particle-tracking simulations conducted for the regional groundwater flow and risk assessment indicated that contamination from Rainier Mesa and Shoshone Mountain were unlikely to leave the NTS during the 1,000-year period of interest (DOE/NV, 1997a). It is anticipated that CAU-scale modeling will modify these results somewhat, but it is not expected to radically alter the outcome of these previous particle-tracking simulations within the 1,000-year period of interest. The Rainier Mesa/Shoshone Mountain CAIP describes the corrective action investigation (CAI) to be conducted at the Rainier Mesa/Shoshone Mountain CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The CAI will be conducted by the UGTA Project, which is part of the NNSA/NSO Environmental Restoration Project (ERP). The purpose and scope of the CAI are presented in this section, followed by a summary of the entire document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16,more » Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) to the dose-based final action level (FAL). The presence of TED exceeding the FAL is considered a radiological contaminant of concern (COC). Anything identified as a COC will require corrective action. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters will be used to measure external radiological dose. Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plume, it was determined that the releases from the nuclear tests are co-located and will be investigated concurrently. A field investigation will be performed to define areas where TED exceeds the FAL and to determine whether other COCs are present at the site. The investigation will also collect information to determine the presence and nature of contamination associated with migration and excavation, as well as any potential releases discovered during the investigation. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less
9 CFR 416.15 - Corrective Actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective... the procedures specified therein, or the implementation or maintenance of the Sanitation SOP's, may...
2016-08-01
prioritization of key information technology limits management’s ability to focus audit readiness efforts on the systems with the highest risk...corrective actions for the higher-risk systems first. For an audit readiness plan for key information technology systems, the Navy provided a schedule...prioritization of key information technology systems used in the FBWT process limits management’s ability to focus audit readiness efforts on the most
Hartwigsen, Gesa; Bestmann, Sven; Ward, Nick S.; Woerbel, Saskia; Mastroeni, Claudia; Granert, Oliver; Siebner, Hartwig R.
2013-01-01
The ability to discard a prepared action plan in favor of an alternative action is critical when facing sudden environmental changes. We tested whether the functional contribution of left supramarginal gyrus (SMG) during action reprogramming depends on the functional integrity of left dorsal premotor cortex (PMd). Adopting a dual-site repetitive transcranial magnetic stimulation (rTMS) strategy, we first transiently disrupted PMd with “offline” 1Hz rTMS and then applied focal “online” rTMS to SMG whilst human subjects performed a spatially-precued reaction time task. Effective online rTMS of SMG but not sham rTMS of SMG increased errors when subjects had to reprogram their action in response to an invalid precue regardless of the type of preceding offline rTMS. This suggests that left SMG primarily contributes to the online updating of actions by suppressing invalidly prepared responses. Online rTMS of SMG additionally increased reaction times for correct responses in invalidly-precued trials, but only after offline rTMS of PMd. We infer that offline rTMS caused an additional dysfunction of PMd which increased the functional relevance of SMG for rapid activation of the correct response, and sensitized SMG to the disruptive effects of online rTMS. These results not only provide causal evidence that left PMd and SMG jointly contribute to action reprogramming, but also that the respective functional weight of these areas can be rapidly redistributed. This mechanism might constitute a generic feature of functional networks that allows for rapid functional compensation in response to focal dysfunctions. PMID:23152600
Trust, but verify - Accuracy of clinical commercial radiation Treatment Planning Systems
NASA Astrophysics Data System (ADS)
Lehmann, J.; Kenny, J.; Lye, J.; Dunn, L.; Williams, I.
2014-03-01
Computer based Treatment Planning Systems (TPS) are used worldwide to design and calculate treatment plans for treating radiation therapy patients. TPS are generally well designed and thoroughly tested by their developers and local physicists prior to clinical use. However, the wide-reaching impact of their accuracy warrants ongoing vigilance. This work reviews the findings of the Australian national audit system and provides recommendations for checks of TPS. The Australian Clinical Dosimetry Service (ACDS) has designed and implemented a national system of audits, currently in a three year test phase. The Level III audits verify the accuracy of a beam model of a facility's TPS through a comparison of measurements with calculation at selected points in an anthropomorphic phantom. The plans are prescribed by the ACDS and all measurement equipment is brought in for independent onsite measurements. In this first version of audits, plans are comparatively simple, involving asymmetric fields, wedges and inhomogeneities. The ACDS has performed 14 Level III audits to-date. Six audits returned at least one measurement at Action Level, indicating that the measured dose differed more than 3.3% (but less than 5%) from the planned dose. Two audits failed (difference >5%). One fail was caused by a data transmission error coupled with quality assurance (QA) not being performed. The second fail was investigated and reduced to Action Level with the onsite audit team finding phantom setup at treatment a contributing factor. The Action Level results are attributed to small dose calculation deviations within the TPS, which are investigated and corrected by the facilities. Small deviations exist in clinical TPS which can add up and can combine with output variations to result in unacceptable variations. Ongoing checks and independent audits are recommended.
78 FR 45983 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; withdrawal... withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based... determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle...
Documents Pertaining to Resource Conservation and Recovery Act Corrective Action Event Codes
Document containing RCRA Corrective Action event codes and definitions, including national requirements, initiating sources, dates, and guidance, from the first facility assessment until the Corrective Action is terminated.
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...
Apollo experience report: Problem reporting and corrective action system
NASA Technical Reports Server (NTRS)
Adams, T. J.
1974-01-01
The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.
40 CFR 258.73 - Financial assurance for corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...
40 CFR 258.73 - Financial assurance for corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-11-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.
4 CFR 28.131 - Corrective action proceedings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT THE GOVERNMENT ACCOUNTABILITY OFFICE Corrective Action, Disciplinary and Stay Proceedings § 28.131 Corrective action proceedings...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
...EPA is correcting its previous full approval of Texas's Clean Air Act (CAA) Prevention of Significant Deterioration (PSD) program to be a partial approval and partial disapproval. The state did not address, or provide adequate legal authority for, the program's application to all pollutants that would become newly subject to regulation in the future, including non-National Ambient Air Quality Standard (NAAQS) pollutants, among them greenhouse gases (GHGs). Further, EPA is promulgating a federal implementation plan (FIP), as required following the partial disapproval, to establish a PSD permitting program in Texas for GHG-emitting sources. EPA is taking this action through interim final rulemaking, effective upon publication, to ensure the availability of a permitting authority-- EPA--in Texas for GHG-emitting sources when they become subject to PSD on January 2, 2011. This will allow those sources to proceed with plans to construct or expand. This rule will expire on April 30, 2011. EPA is also proposing a notice-and-comment rulemaking that mirrors this rulemaking.
Tiger Team Assessments seventeen through thirty-five: A summary and analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-01
This report provides a summary and analysis of the Department of Energy's (DOE'S) 19 Tiger Team Assessments that were conducted from October 1990 to July 1992. The sites are listed in the box below, along with their respective program offices and assessment completion dates. This analysis relied solely on the information contained in the Tiger Team Assessment Reports. The findings and concerns documented by the Tiger Teams provide a database of information about the then-current ES H programs and practice. Program Secretarial Officers (PSOS) and field managers may use this information, along with other sources (such as the Corrective Actionmore » Plans, Progress Assessments, and Self-Assessments), to address the ES H deficiencies found, prioritize and plan appropriate corrective actions, measure progress toward solving the problems, strengthen and transfer knowledge about areas where site performance exemplified the ES H mindset, and so forth. Further analyses may be suggested by the analysis presented in this report.« less
34 CFR 200.49 - SEA responsibilities for school improvement, corrective action, and restructuring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false SEA responsibilities for school improvement, corrective... Agencies Lea and School Improvement § 200.49 SEA responsibilities for school improvement, corrective action... subject to corrective action on January 7, 2002, the SEA must ensure that the LEA for that school provides...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD09000.L14300000.ES0000; CACA- 051457] Correction for Notice of Realty Action; Recreation and Public Purposes Act Classification; California AGENCY: Bureau of Land Management, Interior. ACTION: Correction SUMMARY: This notice corrects a Notice of Realty...
Taking two to tango: fMRI analysis of improvised joint action with physical contact
Belyk, Michel; Brown, Steven
2018-01-01
Many forms of joint action involve physical coupling between the participants, such as when moving a sofa together or dancing a tango. We report the results of a novel two-person functional MRI study in which trained couple dancers engaged in bimanual contact with an experimenter standing next to the bore of the magnet, and in which the two alternated between being the leader and the follower of joint improvised movements. Leading showed a general pattern of self-orientation, being associated with brain areas involved in motor planning, navigation, sequencing, action monitoring, and error correction. In contrast, following showed a far more sensory, externally-oriented pattern, revealing areas involved in somatosensation, proprioception, motion tracking, social cognition, and outcome monitoring. We also had participants perform a “mutual” condition in which the movement patterns were pre-learned and the roles were symmetric, thereby minimizing any tendency toward either leading or following. The mutual condition showed greater activity in brain areas involved in mentalizing and social reward than did leading or following. Finally, the analysis of improvisation revealed the dual importance of motor-planning and working-memory areas. We discuss these results in terms of theories of both joint action and improvisation. PMID:29324862
16 CFR 1209.37 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
2003-04-07
CLASSIFICATION: Unclassified In 1987, the Equal Employment Opportunity Commission ( EEOC ) released Management Directive 714 (MD 714), “Instructions for the...accomplishment reports" and plan updates to the EEOC . Such programs have as their stated aim correcting any “manifest imbalance or conspicuous absence of...Equal Employment Opportunity Commission ( EEOC ) in Federal District Court in Washington, D.C. That suit may have triggered or been part of a chain of
2011-09-30
Ratio TAFS Treasury Appropriation Fund Symbol INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY DRIVE ARLINGTON, VIRGINIA 22202-4704...Symbol ( TAFS ) to the www.recovery.gov Web site. As a result of our review, officials at AFCESA took action to correct the errors in the...projects in a timely manner, and the funding authorization documents properly identified a Recovery Act designation. Funding documents cited a TAFS of
Use of failure mode effect analysis (FMEA) to improve medication management process.
Jain, Khushboo
2017-03-13
Purpose Medication management is a complex process, at high risk of error with life threatening consequences. The focus should be on devising strategies to avoid errors and make the process self-reliable by ensuring prevention of errors and/or error detection at subsequent stages. The purpose of this paper is to use failure mode effect analysis (FMEA), a systematic proactive tool, to identify the likelihood and the causes for the process to fail at various steps and prioritise them to devise risk reduction strategies to improve patient safety. Design/methodology/approach The study was designed as an observational analytical study of medication management process in the inpatient area of a multi-speciality hospital in Gurgaon, Haryana, India. A team was made to study the complex process of medication management in the hospital. FMEA tool was used. Corrective actions were developed based on the prioritised failure modes which were implemented and monitored. Findings The percentage distribution of medication errors as per the observation made by the team was found to be maximum of transcription errors (37 per cent) followed by administration errors (29 per cent) indicating the need to identify the causes and effects of their occurrence. In all, 11 failure modes were identified out of which major five were prioritised based on the risk priority number (RPN). The process was repeated after corrective actions were taken which resulted in about 40 per cent (average) and around 60 per cent reduction in the RPN of prioritised failure modes. Research limitations/implications FMEA is a time consuming process and requires a multidisciplinary team which has good understanding of the process being analysed. FMEA only helps in identifying the possibilities of a process to fail, it does not eliminate them, additional efforts are required to develop action plans and implement them. Frank discussion and agreement among the team members is required not only for successfully conducing FMEA but also for implementing the corrective actions. Practical implications FMEA is an effective proactive risk-assessment tool and is a continuous process which can be continued in phases. The corrective actions taken resulted in reduction in RPN, subjected to further evaluation and usage by others depending on the facility type. Originality/value The application of the tool helped the hospital in identifying failures in medication management process, thereby prioritising and correcting them leading to improvement.
Soares, Sérgio R A; Bernardes, Ricardo S; Netto, Oscar de M Cordeiro
2002-01-01
The understanding of sanitation infrastructure, public health, and environmental relations is a fundamental assumption for planning sanitation infrastructure in urban areas. This article thus suggests elements for developing a planning model for sanitation infrastructure. The authors performed a historical survey of environmental and public health issues related to the sector, an analysis of the conceptual frameworks involving public health and sanitation systems, and a systematization of the various effects that water supply and sanitation have on public health and the environment. Evaluation of these effects should guarantee the correct analysis of possible alternatives, deal with environmental and public health objectives (the main purpose of sanitation infrastructure), and provide the most reasonable indication of actions. The suggested systematization of the sanitation systems effects in each step of their implementation is an advance considering the association between the fundamental elements for formulating a planning model for sanitation infrastructure.
75 FR 29803 - Agency Information Collection Activity Seeking OMB Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... action to correct unsafe conditions in aircraft, engines, propellers, and appliances. Reports of... issued to require correct corrective action to correct unsafe conditions in aircraft, engines, propellers...
Evaluation of Corrective Action Team (CAT) Leader Training in Aeronautical Systems Division
1991-09-01
00A DI EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION CA THESIS Kirk J. Streitrater, Captain, USAF AFIT...EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Kirk J. Streitmater, Captain, USAF AFIT/GSM/LSR/91S-25...8217, , C- s :C AFIT/GSM/LSR/91S-25 EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Presented to the
Moving and memorizing: motor planning modulates the recency effect in serial and free recall.
Weigelt, Matthias; Rosenbaum, David A; Huelshorst, Sven; Schack, Thomas
2009-09-01
Motor planning has generally been studied in situations where participants carry out physical actions without a particular purpose. Yet in everyday life physical actions are usually carried out for higher-order goals. We asked whether two previously discovered motor planning phenomena--the end-state comfort effect and motor hysteresis--would hold up if the actions were carried out in the service of higher-order goals. The higher-order goal we chose to study was memorization. By focusing on memorization, we asked not only how and whether motor planning is affected by the need to memorize, but also how memory performance might depend on the cognitive demands of motor planning. We asked university-student participants to retrieve cups from a column of drawers and memorize as many letters as possible from the inside of the cups. The drawers were opened either in a random order (Experiment 1) or in a regular order (Experiments 2 and 3). The end-state comfort effect and motor hysteresis were replicated in these conditions, indicating that the effects hold up when physical actions are carried out for the sake of a higher-order goal. Surprisingly, one of the most reliable effects in memory research was eliminated, namely, the tendency of recent items to be recalled better than earlier items--the recency effect. This outcome was not an artifact of memory being uniformly poor, because the tendency of initial items to be recalled better than later items--the primacy effect--was obtained. Elimination of the recency effect was not due to the requirement that participants recall items in their correct order, for the recency effect was also eliminated when the items could be recalled in any order (Experiment 3). These and other aspects of the results support recent claims for tighter links between perceptual-motor control and intellectual (symbolic) processing than have been assumed in the past.
Planning and executing complex large-scale exercises.
McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M
2014-01-01
Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.
40 CFR 147.2914 - Corrective action for wells authorized by rule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... potential endangerment of an USDW, then action as described in paragraph (a) (1) or (2) of this section must... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Corrective action for wells authorized... PROGRAMS Osage Mineral Reserve-Class II Wells § 147.2914 Corrective action for wells authorized by rule...
Can persuasive messages encourage individuals to create action plans for physical activity?
Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E
2014-08-01
Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, Nevada Operations Office
2000-02-08
This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less
RCRA Corrective Action training to develop and enhance the skills of qualified personnel who will implement corrective actions for their sites by the year 2020 that are protective of human health and the environment while encouraging revitalization.
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
Sensorimotor Learning Biases Choice Behavior: A Learning Neural Field Model for Decision Making
Schöner, Gregor; Gail, Alexander
2012-01-01
According to a prominent view of sensorimotor processing in primates, selection and specification of possible actions are not sequential operations. Rather, a decision for an action emerges from competition between different movement plans, which are specified and selected in parallel. For action choices which are based on ambiguous sensory input, the frontoparietal sensorimotor areas are considered part of the common underlying neural substrate for selection and specification of action. These areas have been shown capable of encoding alternative spatial motor goals in parallel during movement planning, and show signatures of competitive value-based selection among these goals. Since the same network is also involved in learning sensorimotor associations, competitive action selection (decision making) should not only be driven by the sensory evidence and expected reward in favor of either action, but also by the subject's learning history of different sensorimotor associations. Previous computational models of competitive neural decision making used predefined associations between sensory input and corresponding motor output. Such hard-wiring does not allow modeling of how decisions are influenced by sensorimotor learning or by changing reward contingencies. We present a dynamic neural field model which learns arbitrary sensorimotor associations with a reward-driven Hebbian learning algorithm. We show that the model accurately simulates the dynamics of action selection with different reward contingencies, as observed in monkey cortical recordings, and that it correctly predicted the pattern of choice errors in a control experiment. With our adaptive model we demonstrate how network plasticity, which is required for association learning and adaptation to new reward contingencies, can influence choice behavior. The field model provides an integrated and dynamic account for the operations of sensorimotor integration, working memory and action selection required for decision making in ambiguous choice situations. PMID:23166483
Defense.gov - Special Report: VOTE
Voting Action Plan (pdf) 2013 USMC Voting Action Plan (pdf) 2013 Army Voting Action Plan (pdf) Air Force Voting Plan 2012-13 (pdf) Army Voting Action Plan 2012 (pdf) Marine Corps Voting Action Plan 2012 (pdf ) Navy Voting Action Plan (pdf) Overseas Vote Foundation Project Vote Smart Preparing for the 2012
Prefrontal neural correlates of memory for sequences.
Averbeck, Bruno B; Lee, Daeyeol
2007-02-28
The sequence of actions appropriate to solve a problem often needs to be discovered by trial and error and recalled in the future when faced with the same problem. Here, we show that when monkeys had to discover and then remember a sequence of decisions across trials, ensembles of prefrontal cortex neurons reflected the sequence of decisions the animal would make throughout the interval between trials. This signal could reflect either an explicit memory process or a sequence-planning process that begins far in advance of the actual sequence execution. This finding extended to error trials such that, when the neural activity during the intertrial interval specified the wrong sequence, the animal also attempted to execute an incorrect sequence. More specifically, we used a decoding analysis to predict the sequence the monkey was planning to execute at the end of the fore-period, just before sequence execution. When this analysis was applied to error trials, we were able to predict where in the sequence the error would occur, up to three movements into the future. This suggests that prefrontal neural activity can retain information about sequences between trials, and that regardless of whether information is remembered correctly or incorrectly, the prefrontal activity veridically reflects the animal's action plan.
2014-09-29
In response to this finding, AMC is initiating a Depot Material Requirements Planning ( MRP ) Integrated Process Team (IPT) from which one objective...methodologies for DOF reviews and corrective actions by AMC and its component organizations. The target completion date for the Depot MRP IPT is June...implemented a matrix for MRP SOW where the aviation programs were updated in Production LMP 1QFY14. Army Materiel Command (cont’d) Management
40 CFR 63.1382 - Emission standards
Code of Federal Regulations, 2010 CFR
2010-07-01
... complete corrective actions in a timely manner according to the procedures in the operations, maintenance... or operator must initiate corrective action within 1 hour of an alarm from a bag leak detection system and complete corrective actions in a timely manner according to the procedures in the operations...
7 CFR 1730.25 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Corrective action. 1730.25 Section 1730.25... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.25 Corrective action. (a) For any items on the RUS Form 300 rated unsatisfactory (i.e., 0 or 1) by the borrower...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
Eighteen- and 24-Month-Old Infants Correct Others in Anticipation of Action Mistakes
ERIC Educational Resources Information Center
Knudsen, Birgit; Liszkowski, Ulf
2012-01-01
Much of human communication and collaboration is predicated on making predictions about others' actions. Humans frequently use predictions about others' action mistakes to correct others and spare them mistakes. Such anticipatory correcting reveals a social motivation for unsolicited helping. Cognitively, it requires forward inferences about…
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...
5 CFR 735.103 - What other regulations pertain to employee conduct?
Code of Federal Regulations, 2010 CFR
2010-01-01
... employee's violation of those regulations may cause the employee's agency to take disciplinary action, or corrective action as that term is used in 5 CFR part 2635. Such disciplinary action or corrective action may...
Predictive sufficiency and the use of stored internal state
NASA Technical Reports Server (NTRS)
Musliner, David J.; Durfee, Edmund H.; Shin, Kang G.
1994-01-01
In all embedded computing systems, some delay exists between sensing and acting. By choosing an action based on sensed data, a system is essentially predicting that there will be no significant changes in the world during this delay. However, the dynamic and uncertain nature of the real world can make these predictions incorrect, and thus, a system may execute inappropriate actions. Making systems more reactive by decreasing the gap between sensing and action leaves less time for predictions to err, but still provides no principled assurance that they will be correct. Using the concept of predictive sufficiency described in this paper, a system can prove that its predictions are valid, and that it will never execute inappropriate actions. In the context of our CIRCA system, we also show how predictive sufficiency allows a system to guarantee worst-case response times to changes in its environment. Using predictive sufficiency, CIRCA is able to build real-time reactive control plans which provide a sound basis for performance guarantees that are unavailable with other reactive systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krenzien, Susan; Marutzky, Sam
This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2013. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2013. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. In addition, integrated UGTA required reading and correctivemore » action tracking was instituted.« less
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nacht, S.
1999-08-01
The Mercury Fire Training Pit is a former fire training area located in Area 23 of the Nevada Test Site (NTS). The Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting personnel at the NTS, and encompasses an area approximately 107 meters (m) (350 feet [ft]) by 137 m (450 ft). The Mercury Fire Training Pit formerly included a bermed burn pit with four small burn tanks, four large above ground storage tanks an overturned bus, a telephone pole storage area, and areas for burning sheds, pallets, and cables. Closure activities will includemore » excavation of the impacted soil in the aboveground storage tank and burn pit areas to a depth of 1.5 m (5 ft), and excavation of the impacted surface soil downgradient of the former ASTs and burnpit areas to a depth of 0.3 m (1 ft). Excavated soil will be disposed in the Area 6 Hydrocarbon Landfill at the NTS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kupar, J.; Hasek, M.
The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less
[Mobile emergency care medical records audit: the need for Tunisian guidelines].
Mallouli, Manel; Hchaichi, Imen; Ammar, Asma; Sehli, Jihène; Zedini, Chekib; Mtiraoui, Ali; Ajmi, Thouraya
2017-03-06
Objective: This study was designed to assess the quality of the Gabès (Tunisia) mobile emergency care medical records and propose corrective actions.Materials and methods: A clinical audit was performed at the Gabès mobile emergency care unit (SMUR). Records of day, night and weekend primary and secondary interventions during the first half of 2014 were analysed according to a data collection grid comprising 56 criteria based on the SMUR guidelines and the 2013 French Society of Emergency Medicine evaluation guide. A non-conformance score was calculated for each section.Results: 415 medical records were analysed. The highest non-conformance rates (48.5%) concerned the “specificities of the emergency medical record” section. The lowest non-conformance rates concerned the surveillance data section (23.4%). The non-conformance score for the medical data audit was 24%.Conclusion: This audit identified minor dysfunctions that could be due to the absence of local guidelines concerning medical records in general and more specifically SMUR. Corrective measures were set up in the context of a short-term and intermediate-term action plan.
Integration of a computerized two-finger gripper for robot workstation safety
NASA Technical Reports Server (NTRS)
Sneckenberger, John E.; Yoshikata, Kazuki
1988-01-01
A microprocessor-based controller has been developed that continuously monitors and adjusts the gripping force applied by a special two-finger gripper. This computerized force sensing gripper system enables the endeffector gripping action to be independently detected and corrected. The gripping force applied to a manipulated object is real-time monitored for problem situations, situations which can occur during both planned and errant robot arm manipulation. When unspecified force conditions occur at the gripper, the gripping force controller initiates specific reactions to cause dynamic corrections to the continuously variable gripping action. The force controller for this intelligent gripper has been interfaced to the controller of an industrial robot. The gripper and robot controllers communicate to accomplish the successful completion of normal gripper operations as well as unexpected hazardous situations. An example of an unexpected gripping condition would be the sudden deformation of the object being manipulated by the robot. The capabilities of the interfaced gripper-robot system to apply workstation safety measures (e.g., stop the robot) when these unexpected gripping effects occur have been assessed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
..., page 73114. Airworthiness Directives are regulations issued to require action to correct unsafe... emergency corrective action is taken to determine if the action was adequate to correct the unsafe condition... DePaepe at (405) 954-9362, or by email at: [email protected] . SUPPLEMENTARY INFORMATION: [[Page...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
Corrective Action Framework for the Office of Student Financial Assistance.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
An ongoing corrective action framework for the Office of Student Financial Assistance (OSFA) is presented. Attention is directed to the formal management structure in OSFA and current initiatives to improve management, and the placement of the corrective action process in the organizational hierarchy. Four formal mechanisms needed to implement the…
77 FR 74024 - Sunshine Act Meetings; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-12
... INTER-AMERICAN FOUNDATION BOARD MEETING Sunshine Act Meetings; Correction AGENCY: Inter-American Foundation. ACTION: Correction. SUMMARY: This action corrects the order of the MATTERS TO BE CONSIDERED and... September 24, 2012, Meeting of the Board of Directors'' subsections. CONTACT PERSON FOR MORE INFORMATION...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Notice of availability and request for public comment..., Division of Reproductive Health, Attn: National Public Health Action Plan for the Detection, Prevention...
76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... requesting public comment on the draft A Public Health Action Plan to Combat Antimicrobial Resistance. HHS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan, which...
76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... Federal Register requesting public comment on the draft, A Public Health Action Plan to Combat...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marutzky, Sam J.; Andrews, Robert
The peer review team commends the Navarro-Intera, LLC (N-I), team for its efforts in using limited data to model the fate of radionuclides in groundwater at Yucca Flat. Recognizing the key uncertainties and related recommendations discussed in Section 6.0 of this report, the peer review team has concluded that U.S. Department of Energy (DOE) is ready for a transition to model evaluation studies in the corrective action decision document (CADD)/corrective action plan (CAP) stage. The DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) clarified the charge to the peer review team in a letter dated October 9, 2014, frommore » Bill R. Wilborn, NNSA/NFO Underground Test Area (UGTA) Activity Lead, to Sam J. Marutzky, N-I UGTA Project Manager: “The model and supporting information should be sufficiently complete that the key uncertainties can be adequately identified such that they can be addressed by appropriate model evaluation studies. The model evaluation studies may include data collection and model refinements conducted during the CADD/CAP stage. One major input to identifying ‘key uncertainties’ is the detailed peer review provided by independent qualified peers.” The key uncertainties that the peer review team recognized and potential concerns associated with each are outlined in Section 6.0, along with recommendations corresponding to each uncertainty. The uncertainties, concerns, and recommendations are summarized in Table ES-1. The number associated with each concern refers to the section in this report where the concern is discussed in detail.« less
Improving the treatment planning and delivery process of Xoft electronic skin brachytherapy.
Manger, Ryan; Rahn, Douglas; Hoisak, Jeremy; Dragojević, Irena
2018-05-14
To develop an improved Xoft electronic skin brachytherapy process and identify areas of further improvement. A multidisciplinary team conducted a failure modes and effects analysis (FMEA) by developing a process map and a corresponding list of failure modes. The failure modes were scored for their occurrence, severity, and detectability, and a risk priority number (RPN) was calculated for each failure mode as the product of occurrence, severity, and detectability. Corrective actions were implemented to address the higher risk failure modes, and a revised process was generated. The RPNs of the failure modes were compared between the initial process and final process to assess the perceived benefits of the corrective actions. The final treatment process consists of 100 steps and 114 failure modes. The FMEA took approximately 20 person-hours (one physician, three physicists, and two therapists) to complete. The 10 most dangerous failure modes had RPNs ranging from 336 to 630. Corrective actions were effective at addressing most failure modes (10 riskiest RPNs ranging from 189 to 310), yet the RPNs were higher than those published for alternative systems. Many of these high-risk failure modes remained due to hardware design limitations. FMEA helps guide process improvement efforts by emphasizing the riskiest steps. Significant risks are apparent when using a Xoft treatment unit for skin brachytherapy due to hardware limitations such as the lack of several interlocks, a short source lifespan, and variability in source output. The process presented in this article is expected to reduce but not eliminate these risks. Copyright © 2018 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.
Climate Action Planning Process | Climate Neutral Research Campuses | NREL
Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module discusses the regulatory and statutory requirements and authorities governing the Resource Conservation and Recovery Act (RCRA) corrective action process. There are minimal regulatory requirements at present, but the Agency has issued a proposed rule (55 FR 30798; July 27, 1990) that would establish a comprehensive regulatory framework for implementing the corrective action program. This proposed rule and other guidance developed pursuant to statutory authorities are used to structure corrective action requirements in facility permits and orders. This module describes the current statutory and regulatory structure and discusses the future of the proposed rule.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-27
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Extension of public comment period. SUMMARY: On May 16... National Public Health Action Plan for the Detection, Prevention, and Management of Infertility (77 FR...
Cleanups In My Community (CIMC) - Hazardous Waste Corrective Actions, National Layer
This data layer provides access to Hazardous Waste Corrective Action sites as part of the CIMC web service. Hazardous waste is waste that is dangerous or potentially harmful to our health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded commercial products, like cleaning fluids or pesticides, or the by-products of manufacturing processes. The RCRA Corrective Action Program, run by EPA and 43 authorized states and territories, works with facilities that have treated, stored, or disposed of hazardous wastes (TSDs) to protect public health and the environment by investigating and cleaning up hazardous releases to soil, ground water, surface water, and air at their facilities.RCRA Corrective Action sites in all 50 states and four U.S. territories cover 18 million acres of land.EPA estimates that more than 35 million people, roughly 12 percent of the U.S. population, live within one mile of a RCRA Corrective Action site (based on the 2000 U.S. Census).RCRA Corrective Action facilities include many current and former chemical manufacturing plants, oil refineries, lead smelters, wood preservers, steel mills, commercial landfills, and a variety of other types of entities. Due to poor practices prior to environmental regulations, Corrective Action facilities have left large stretches of river sediments laden with PCBs; deposited lead in residential yards and parks beyond site boundaries; polluted drinking water wells
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
ERIC Educational Resources Information Center
Stewart, Francine A.
2016-01-01
The purpose of this study was to find out which corrective actions have a positive impact on improving students' learning and achievement and ultimately moving underperforming elementary schools out of Program Improvement (PI) status in California. Some common corrective actions include, but are not limited to, instructional program, instructional…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mann, L.J.
1996-10-01
Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey`s (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation`s water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities willmore » be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient.« less
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
Lengerich, Eugene J; Kluhsman, Brenda C; Bencivenga, Marcyann; Allen, Regina; Miele, Mary Beth; Farace, Elana
2007-09-01
In 2002, 10.4% of the 10 million persons alive who have ever been diagnosed with cancer had colorectal cancer (CRC). Barriers, such as distance, terrain, access to care and cultural differences, to CRC survivorship may be especially relevant in rural communities. We tested the hypothesis that teams from rural cancer coalitions and hospitals would develop a Community Plan (CP) to enhance CRC survivorship. We used community-based participatory research and the PRECEDE-PROCEED model to train teams from rural cancer coalitions and hospitals in Pennsylvania and New York. We measured knowledge at three points in time and tested the change with McNemar's test, corrected for multiple comparisons (p < 0.0167). We also conducted a qualitative review of the CP contents. Fourteen (93.3%) of the 15 coalitions or hospitals initially recruited to the study completed a CP. Knowledge in public health, sponsorship of A National Action Plan for Cancer Survivorship, and CRC survivorship and treatment increased. Teams identified perceived barriers and community assets. All teams planned to increase awareness of community assets and almost all planned to enhance treatment-related care and psychosocial care for the CRC survivor; 50% planned to enhance primary care and CRC screening. The study demonstrated the interest and ability of rural organizations to plan to enhance CRC survivorship, including linkage of CRC survivorship to primary care. Rural cancer coalitions and hospitals may be a vehicle to develop local action for A National Action Plan. Access to more comprehensive care for CRC cancer survivors in rural communities appears to be facilitated by the community-based initiative described and investigated in this study. Efforts such as these could be replicated in other rural communities and may impact the care and quality of life of survivors with many types of cancers. While access to health services may be increased through community-based initiatives, we still need to measure the impact of such initiatives on the long term health and well being of cancer survivors in rural locations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cabble, Kevin J.; Boehlecke, Robert F.
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less
NASA Astrophysics Data System (ADS)
Mallari, Lawrence Anthony Castro
This project proposes a manual specifically for remedying an ineffective Corrective Action Request System for Company ABC by providing dispositions within the company's quality procedure. A Corrective Action Request System is a corrective action tool that provides a means for employees to engage in the process improvement, problem elimination cycle. At Company ABC, Corrective Action Recommendations (CARs) are not provided with timely dispositions; CARs are being ignored due to a lack of training and awareness of Company ABC's personnel and quality procedures. In this project, Company ABC's quality management software database is scrutinized to identify the number of delinquent, non-dispositioned CARs in 2014. These CARs are correlated with the number of nonconformances generated for the same issue while the CAR is still open. Using secondary data, the primary investigator finds that nonconformances are being remediated at the operational level. However, at the administrative level, CARS are being ignored and forgotten.
78 FR 63903 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Airplanes AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM... corrective actions if necessary. This proposed AD also specifies an optional action of doing an inspection for corrosion damage of the bonding brackets, and corrective actions if necessary, which would...
The Test and Evaluation of Non-Chromate Finishing Agent
NASA Technical Reports Server (NTRS)
Okhio, Cyril; Gulley, Harold; Steele, Gynelle (Technical Monitor)
2002-01-01
Clark Atlanta University (CAU) has engaged a team comprised of university faculty members, student research assistants, and consultants from industrial and technology firms in order to ensure that NASA receives a quality product on time and within budget. In addition to the current related expertise which CAU possess, we have enlisted materials and aid from several other agencies, and machine manufacturers to assist us in completing the project on time and according to plan and budget. The research team is employing sound engineering principles in its approach to this project. Each phase of the project is preceded by a thorough and complete planning session that details the work plan and provide a comprehensive review of the work to be accomplished during the particular phase and by whom. Maximum use is being made of existing or already planned capabilities to ensure maximum economy, and frequent online reviews are being held to measure progress and to identify a potential problem in sufficient time to allow for corrective action.
Climate Neutral Research Campuses | NREL
the background. Set an example for climate neutrality. Use NREL's climate action planning process and more. Climate Action Planning Process Identify the best technology options for a climate action plan . Climate Action Planning Tool Identify the best technology options for a climate action plan. Technology
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...