1990-09-01
following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W
Cost Estimation and Control for Flight Systems
NASA Technical Reports Server (NTRS)
Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)
2002-01-01
Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.
Nunes, Sheila Elke Araujo; Minamisava, Ruth; Vieira, Maria Aparecida da Silva; Itria, Alexander; Pessoa, Vicente Porfirio; de Andrade, Ana Lúcia Sampaio Sgambatti; Toscano, Cristiana Maria
2017-01-01
ABSTRACT Objective To determine and compare hospitalization costs of bacterial community-acquired pneumonia cases via different costing methods under the Brazilian Public Unified Health System perspective. Methods Cost-of-illness study based on primary data collected from a sample of 59 children aged between 28 days and 35 months and hospitalized due to bacterial pneumonia. Direct medical and non-medical costs were considered and three costing methods employed: micro-costing based on medical record review, micro-costing based on therapeutic guidelines and gross-costing based on the Brazilian Public Unified Health System reimbursement rates. Costs estimates obtained via different methods were compared using the Friedman test. Results Cost estimates of inpatient cases of severe pneumonia amounted to R$ 780,70/$Int. 858.7 (medical record review), R$ 641,90/$Int. 706.90 (therapeutic guidelines) and R$ 594,80/$Int. 654.28 (Brazilian Public Unified Health System reimbursement rates). Costs estimated via micro-costing (medical record review or therapeutic guidelines) did not differ significantly (p=0.405), while estimates based on reimbursement rates were significantly lower compared to estimates based on therapeutic guidelines (p<0.001) or record review (p=0.006). Conclusion Brazilian Public Unified Health System costs estimated via different costing methods differ significantly, with gross-costing yielding lower cost estimates. Given costs estimated by different micro-costing methods are similar and costing methods based on therapeutic guidelines are easier to apply and less expensive, this method may be a valuable alternative for estimation of hospitalization costs of bacterial community-acquired pneumonia in children. PMID:28767921
2016-11-01
systems engineering had better outcomes. For example, the Small Diameter Bomb Increment I program, which delivered within cost and schedule estimates ...its current portfolio. This portfolio has experienced cost growth of 48 percent since first full estimates and average delays in delivering initial...stable design, building and testing of prototypes, and demonstration of mature production processes. • Realistic cost estimate : Sound cost estimates
Novaes, Hillegonda Maria Dutilh; Itria, Alexander; Silva, Gulnar Azevedo e; Sartori, Ana Marli Christovam; Rama, Cristina Helena; de Soárez, Patrícia Coelho
2015-01-01
OBJECTIVE: To estimate the annual direct and indirect costs of the prevention and treatment of cervical cancer in Brazil. METHODS: This cost description study used a "gross-costing" methodology and adopted the health system and societal perspectives. The estimates were grouped into sets of procedures performed in phases of cervical cancer care: the screening, diagnosis and treatment of precancerous lesions and the treatment of cervical cancer. The costs were estimated for the public and private health systems, using data from national health information systems, population surveys, and literature reviews. The cost estimates are presented in 2006 USD. RESULTS: From the societal perspective, the estimated total costs of the prevention and treatment of cervical cancer amounted to USD $1,321,683,034, which was categorized as follows: procedures (USD $213,199,490), visits (USD $325,509,842), transportation (USD $106,521,537) and productivity losses (USD $676,452,166). Indirect costs represented 51% of the total costs, followed by direct medical costs (visits and procedures) at 41% and direct non-medical costs (transportation) at 8%. The public system represented 46% of the total costs, and the private system represented 54%. CONCLUSION: Our national cost estimates of cervical cancer prevention and treatment, indicating the economic importance of cervical cancer screening and care, will be useful in monitoring the effect of the HPV vaccine introduction and are of interest in research and health care management. PMID:26017797
LANDSAT D user data processing study
NASA Technical Reports Server (NTRS)
1976-01-01
The major expected users of the LANDSAT D system and a preliminary system design of their required facilities are investigated. This system design will then be costed in order to provide an estimate of the incremental user costs necessitated by LANDSAT D. One major use of these cost estimates is as part of an overall economic cost/benefit argument being developed for the LANDSAT D system. The implication of this motive is key; the system design (and corresponding cost estimates) must be a credible one, but not necessarily an optimum one.
Costing the satellite power system
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1978-01-01
The paper presents a methodology for satellite power system costing, places approximate limits on the accuracy possible in cost estimates made at this time, and outlines the use of probabilistic cost information in support of the decision-making process. Reasons for using probabilistic costing or risk analysis procedures instead of standard deterministic costing procedures are considered. Components of cost, costing estimating relationships, grass roots costing, and risk analysis are discussed. Risk analysis using a Monte Carlo simulation model is used to estimate future costs.
Harvesting systems and costs for southern pine in the 1980s
Frederick W. Cubbage; James E. Granskog
1981-01-01
Timber harvesting systems and their costs are a major concern for the forest products industries. In this paper, harvest costs per cord are estimated, using computer simulation, for current southern pine harvesting systems. The estimations represent a range of mechanization levels. The sensitivity of systems to factors affecting harvest costs - machine costs, fuel...
Jackson, T
2001-05-01
Casemix-funding systems for hospital inpatient care require a set of resource weights which will not inadvertently distort patterns of patient care. Few health systems have very good sources of cost information, and specific studies to derive empirical cost relativities are themselves costly. This paper reports a 5 year program of research into the use of data from hospital management information systems (clinical costing systems) to estimate resource relativities for inpatient hospital care used in Victoria's DRG-based payment system. The paper briefly describes international approaches to cost weight estimation. It describes the architecture of clinical costing systems, and contrasts process and job costing approaches to cost estimation. Techniques of data validation and reliability testing developed in the conduct of four of the first five of the Victorian Cost Weight Studies (1993-1998) are described. Improvement in sampling, data validity and reliability are documented over the course of the research program, the advantages of patient-level data are highlighted. The usefulness of these byproduct data for estimation of relative resource weights and other policy applications may be an important factor in hospital and health system decisions to invest in clinical costing technology.
Lunar base scenario cost estimates: Lunar base systems study task 6.1
NASA Technical Reports Server (NTRS)
1988-01-01
The projected development and production costs of each of the Lunar Base's systems are described and unit costs are estimated for transporting the systems to the lunar surface and for setting up the system.
2001-07-21
APPENDIX A. ACRONYMS ACCES Attenuating Custom Communication Earpiece System ACEIT Automated Cost estimating Integrated Tools AFSC Air Force...documented in the ACEIT cost estimating tool developed by Tecolote, Inc. The factor used was 14 percent of PMP. 1.3 System Engineering/ Program...The data source is the ASC Aeronautical Engineering Products Cost Factor Handbook which is documented in the ACEIT cost estimating tool developed
Computer software to estimate timber harvesting system production, cost, and revenue
Dr. John E. Baumgras; Dr. Chris B. LeDoux
1992-01-01
Large variations in timber harvesting cost and revenue can result from the differences between harvesting systems, the variable attributes of harvesting sites and timber stands, or changing product markets. Consequently, system and site specific estimates of production rates and costs are required to improve estimates of harvesting revenue. This paper describes...
Estimating the Life Cycle Cost of Space Systems
NASA Technical Reports Server (NTRS)
Jones, Harry W.
2015-01-01
A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
National Costs Of The Medical Liability System
Mello, Michelle M.; Chandra, Amitabh; Gawande, Atul A.; Studdert, David M.
2011-01-01
Concerns about reducing the rate of growth of health expenditures have reignited interest in medical liability reforms and their potential to save money by reducing the practice of defensive medicine. It is not easy to estimate the costs of the medical liability system, however. This article identifies the various components of liability system costs, generates national estimates for each component, and discusses the level of evidence available to support the estimates. Overall annual medical liability system costs, including defensive medicine, are estimated to be $55.6 billion in 2008 dollars, or 2.4 percent of total health care spending. PMID:20820010
NASA Technical Reports Server (NTRS)
Harney, A. G.; Raphael, L.; Warren, S.; Yakura, J. K.
1972-01-01
A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.
The Cost of CAI: A Matter of Assumptions.
ERIC Educational Resources Information Center
Kearsley, Greg P.
Cost estimates for Computer Assisted Instruction (CAI) depend crucially upon the particular assumptions made about the components of the system to be included in the costs, the expected lifetime of the system and courseware, and the anticipated student utilization of the system/courseware. The cost estimates of three currently operational systems…
Mental health services costs within the Alberta criminal justice system.
Jacobs, Philip; Moffatt, Jessica; Dewa, Carolyn S; Nguyen, Thanh; Zhang, Ting; Lesage, Alain
2016-01-01
Mental illness has been widely cited as a driver of costs in the criminal justice system. The objective of this paper is to estimate the additional mental health service costs incurred within the criminal justice system that are incurred because of people with mental illnesses who go through the system. Our focus is on costs in Alberta. We set up a model of the flow of all persons through the criminal justice system, including police, court, and corrections components, and for mental health diversion, review, and forensic services. We estimate the transitional probabilities and costs that accrue as persons who have been charged move through the system. Costs are estimated for the Alberta criminal justice system as a whole, and for the mental illness component. Public expenditures for each person diverted or charged in Alberta in the criminal justice system, including mental health costs, were $16,138. The 95% range of this estimate was from $14,530 to $19,580. Of these costs, 87% were for criminal justice services and 13% were for mental illness-related services. Hospitalization for people with mental illness who were reviewed represented the greatest additional cost associated with mental illnesses. Treatment costs stemming from mental illnesses directly add about 13% onto those in the criminal justice system. Copyright © 2016 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
General Learning Corp., Washington, DC.
Objective cost estimates for planning and operating systems should be made after an assessment of administrative factors (school environment) and instructional factors (learning objectives, type of presentation). Specification of appropriate sensory stimuli and the design of alternative systems also precede cost estimations for production,…
Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 7. System Cost.
DOT National Transportation Integrated Search
1973-02-01
The volume presents estimates of the federal government and user costs for the Satellite-Based Advanced Air Traffic Management System and the supporting rationale. The system configuration is that presented in volumes II and III. The cost estimates a...
Manual of phosphoric acid fuel cell power plant cost model and computer program
NASA Technical Reports Server (NTRS)
Lu, C. Y.; Alkasab, K. A.
1984-01-01
Cost analysis of phosphoric acid fuel cell power plant includes two parts: a method for estimation of system capital costs, and an economic analysis which determines the levelized annual cost of operating the system used in the capital cost estimation. A FORTRAN computer has been developed for this cost analysis.
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Department of Defense to rely upon information produced by the system that is needed for management purposes... management systems; and (4) Is subject to applicable financial control systems. Estimating system means the... estimates of costs and other data included in proposals submitted to customers in the expectation of...
Cost and size estimates for an electrochemical bulk energy storage concept
NASA Technical Reports Server (NTRS)
Warshay, M.; Wright, L. O.
1975-01-01
Preliminary capital cost and size estimates were made for a titanium trichloride, titanium tetrachloride, ferric chloride, ferrous chloride redox-flow-cell electric power system. On the basis of these preliminary estimates plus other important considerations, this electrochemical system emerged as having great promise as a bulk energy storage system for power load leveling. The size of this system is less than two per cent of that of a comparable pumped hydroelectric plant. The estimated capital cost of a 10 MW, 60- and 85-MWh redox-flow system compared well with that of competing systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wie, N.H.
An overview of the UCC-ND system for computer-aided cost estimating is provided. The program is generally utilized in the preparation of construction cost estimates for projects costing $25,000,000 or more. The advantages of the system to the manager and the estimator are discussed, and examples of the product are provided. 19 figures, 1 table.
Cost estimating methods for advanced space systems
NASA Technical Reports Server (NTRS)
Cyr, Kelley
1988-01-01
Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.
Constellation Program Life-cycle Cost Analysis Model (LCAM)
NASA Technical Reports Server (NTRS)
Prince, Andy; Rose, Heidi; Wood, James
2008-01-01
The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.
NASA Technical Reports Server (NTRS)
1985-01-01
Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. A narrative summary of the cost estimates and work breakdown structure/dictionary for both study phases is presented. Costs were estimated using the Grumman Space Programs Algorithm for Cost Estimating (SPACE) computer program and results are given for four AOTV configurations. The work breakdown structure follows the standard of the joint government/industry Space Systems Cost Analysis Group (SSCAG). A table is provided which shows cost estimates for each work breakdown structure element.
ERIC Educational Resources Information Center
Meeks, Glenn E.; Fisher, Ricki; Loveless, Warren
Personnel involved in planning or developing schools lack the costing tools that will enable them to determine educational technology costs. This report presents an overview of the technology costing process and the general costs used in estimating educational technology systems on a macro-budget basis, along with simple cost estimates for…
Cost estimating methods for advanced space systems
NASA Technical Reports Server (NTRS)
Cyr, Kelley
1988-01-01
The development of parametric cost estimating methods for advanced space systems in the conceptual design phase is discussed. The process of identifying variables which drive cost and the relationship between weight and cost are discussed. A theoretical model of cost is developed and tested using a historical data base of research and development projects.
48 CFR 2452.216-70 - Estimated cost, base fee and award fee.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...
48 CFR 2452.216-70 - Estimated cost, base fee and award fee.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...
2016-04-30
costs of new defense systems. An inappropriate price index can introduce errors in both development of cost estimating relationships ( CERs ) and in...indexes derived from CERs . These indexes isolate changes in price due to factors other than changes in quality over time. We develop a “Baseline” CER ...The hedonic index application has commonalities with cost estimating relationships ( CERs ), which also model system costs as a function of quality
2010-12-01
processes. Novice estimators must often use of these complicated cost estimation tools (e.g., ACEIT , SEER-H, SEER-S, PRICE-H, PRICE-S, etc.) until...However, the thesis will leverage the processes embedded in cost estimation tools such as the Automated Cost Estimating Integration Tool ( ACEIT ) and the
Satellite Power Systems (SPS) space transportation cost analysis and evaluation
NASA Technical Reports Server (NTRS)
1980-01-01
A picture of Space Power Systems space transportation costs at the present time is given with respect to accuracy as stated, reasonableness of the methods used, assumptions made, and uncertainty associated with the estimates. The approach used consists of examining space transportation costs from several perspectives to perform a variety of sensitivity analyses or reviews and examine the findings in terms of internal consistency and external comparison with analogous systems. These approaches are summarized as a theoretical and historical review including a review of stated and unstated assumptions used to derive the costs, and a performance or technical review. These reviews cover the overall transportation program as well as the individual vehicles proposed. The review of overall cost assumptions is the principal means used for estimating the cost uncertainty derived. The cost estimates used as the best current estimate are included.
Estimating Airline Operating Costs
NASA Technical Reports Server (NTRS)
Maddalon, D. V.
1978-01-01
The factors affecting commercial aircraft operating and delay costs were used to develop an airline operating cost model which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model permits estimates of aircraft related costs, i.e., aircraft service, landing fees, flight attendants, and control fees. A method for estimating the costs of certain types of airline delay is also described.
Government conceptual estimating for contracting and management
NASA Technical Reports Server (NTRS)
Brown, J. A.
1986-01-01
The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.
Cost estimating methods for advanced space systems
NASA Technical Reports Server (NTRS)
Cyr, Kelley
1994-01-01
NASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.
NASA Astrophysics Data System (ADS)
Trivailo, O.; Sippel, M.; Şekercioğlu, Y. A.
2012-08-01
The primary purpose of this paper is to review currently existing cost estimation methods, models, tools and resources applicable to the space sector. While key space sector methods are outlined, a specific focus is placed on hardware cost estimation on a system level, particularly for early mission phases during which specifications and requirements are not yet crystallised, and information is limited. For the space industry, cost engineering within the systems engineering framework is an integral discipline. The cost of any space program now constitutes a stringent design criterion, which must be considered and carefully controlled during the entire program life cycle. A first step to any program budget is a representative cost estimate which usually hinges on a particular estimation approach, or methodology. Therefore appropriate selection of specific cost models, methods and tools is paramount, a difficult task given the highly variable nature, scope as well as scientific and technical requirements applicable to each program. Numerous methods, models and tools exist. However new ways are needed to address very early, pre-Phase 0 cost estimation during the initial program research and establishment phase when system specifications are limited, but the available research budget needs to be established and defined. Due to their specificity, for vehicles such as reusable launchers with a manned capability, a lack of historical data implies that using either the classic heuristic approach such as parametric cost estimation based on underlying CERs, or the analogy approach, is therefore, by definition, limited. This review identifies prominent cost estimation models applied to the space sector, and their underlying cost driving parameters and factors. Strengths, weaknesses, and suitability to specific mission types and classes are also highlighted. Current approaches which strategically amalgamate various cost estimation strategies both for formulation and validation of an estimate, and techniques and/or methods to attain representative and justifiable cost estimates are consequently discussed. Ultimately, the aim of the paper is to establish a baseline for development of a non-commercial, low cost, transparent cost estimation methodology to be applied during very early program research phases at a complete vehicle system level, for largely unprecedented manned launch vehicles in the future. This paper takes the first step to achieving this through the identification, analysis and understanding of established, existing techniques, models, tools and resources relevant within the space sector.
Cost Allocation Issues in Interlibrary Systems.
ERIC Educational Resources Information Center
Alexander, Ernest R.
1985-01-01
In comparing methods of allocating service transaction costs among member libraries of interlibrary systems, questions of how costs are to be estimated, and what cost elements are to be included are critical. Different approaches of estimation yield varying results. Actual distribution of units accounts for greatest variance in allocations. (CDD)
NASA Technical Reports Server (NTRS)
1981-01-01
Pioneer Engineering and Manufacturing Company estimated the cost of manufacturing and Air Brayton Receiver for a Solar Thermal Electric Power System as designed by the AiResearch Division of the Garrett Corporation. Production costs were estimated at annual volumes of 100; 1,000; 5,000; 10,000; 50,000; 100,000 and 1,000,000 units. These costs included direct labor, direct material and manufacturing burden. A make or buy analysis was made of each part of each volume. At high volumes special fabrication concepts were used to reduce operation cycle times. All costs were estimated at an assumed 100% plant capacity. Economic feasibility determined the level of production at which special concepts were to be introduced. Estimated costs were based on the economics of the last half of 1980. Tooling and capital equipment costs were estimated for ach volume. Infrastructure and personnel requirements were also estimated.
Utilizing Expert Knowledge in Estimating Future STS Costs
NASA Technical Reports Server (NTRS)
Fortner, David B.; Ruiz-Torres, Alex J.
2004-01-01
A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.
NASA Technical Reports Server (NTRS)
Jones, Harry
2003-01-01
The Advanced Life Support (ALS) has used a single number, Equivalent System Mass (ESM), for both reporting progress and technology selection. ESM is the launch mass required to provide a space system. ESM indicates launch cost. ESM alone is inadequate for technology selection, which should include other metrics such as Technology Readiness Level (TRL) and Life Cycle Cost (LCC) and also consider perfom.arxe 2nd risk. ESM has proven difficult to implement as a reporting metric, partly because it includes non-mass technology selection factors. Since it will not be used exclusively for technology selection, a new reporting metric can be made easier to compute and explain. Systems design trades-off performance, cost, and risk, but a risk weighted cost/benefit metric would be too complex to report. Since life support has fixed requirements, different systems usually have roughly equal performance. Risk is important since failure can harm the crew, but it is difficult to treat simply. Cost is not easy to estimate, but preliminary space system cost estimates are usually based on mass, which is better estimated than cost. Amass-based cost estimate, similar to ESM, would be a good single reporting metric. The paper defines and compares four mass-based cost estimates, Equivalent Mass (EM), Equivalent System Mass (ESM), Life Cycle Mass (LCM), and System Mass (SM). EM is traditional in life support and includes mass, volume, power, cooling and logistics. ESM is the specifically defined ALS metric, which adds crew time and possibly other cost factors to EM. LCM is a new metric, a mass-based estimate of LCC measured in mass units. SM includes only the factors of EM that are originally measured in mass, the hardware and logistics mass. All four mass-based metrics usually give similar comparisons. SM is by far the simplest to compute and easiest to explain.
ARSENIC REMOVAL COST ESTIMATING PROGRAM
The Arsenic Removal Cost Estimating program (Excel) calculates the costs for using adsorptive media and anion exchange treatment systems to remove arsenic from drinking water. The program is an easy-to-use tool to estimate capital and operating costs for three types of arsenic re...
Developing Analogy Cost Estimates for Space Missions
NASA Technical Reports Server (NTRS)
Shishko, Robert
2004-01-01
The analogy approach in cost estimation combines actual cost data from similar existing systems, activities, or items with adjustments for a new project's technical, physical or programmatic differences to derive a cost estimate for the new system. This method is normally used early in a project cycle when there is insufficient design/cost data to use as a basis for (or insufficient time to perform) a detailed engineering cost estimate. The major limitation of this method is that it relies on the judgment and experience of the analyst/estimator. The analyst must ensure that the best analogy or analogies have been selected, and that appropriate adjustments have been made. While analogy costing is common, there is a dearth of advice in the literature on the 'adjustment methodology', especially for hardware projects. This paper discusses some potential approaches that can improve rigor and repeatability in the analogy costing process.
Tseng, Phillip; Kaplan, Robert S; Richman, Barak D; Shah, Mahek A; Schulman, Kevin A
2018-02-20
Administrative costs in the US health care system are an important component of total health care spending, and a substantial proportion of these costs are attributable to billing and insurance-related activities. To examine and estimate the administrative costs associated with physician billing activities in a large academic health care system with a certified electronic health record system. This study used time-driven activity-based costing. Interviews were conducted with 27 health system administrators and 34 physicians in 2016 and 2017 to construct a process map charting the path of an insurance claim through the revenue cycle management process. These data were used to calculate the cost for each major billing and insurance-related activity and were aggregated to estimate the health system's total cost of processing an insurance claim. Estimated time required to perform billing and insurance-related activities, based on interviews with management personnel and physicians. Estimated billing and insurance-related costs for 5 types of patient encounters: primary care visits, discharged emergency department visits, general medicine inpatient stays, ambulatory surgical procedures, and inpatient surgical procedures. Estimated processing time and total costs for billing and insurance-related activities were 13 minutes and $20.49 for a primary care visit, 32 minutes and $61.54 for a discharged emergency department visit, 73 minutes and $124.26 for a general inpatient stay, 75 minutes and $170.40 for an ambulatory surgical procedure, and 100 minutes and $215.10 for an inpatient surgical procedure. Of these totals, time and costs for activities carried out by physicians were estimated at a median of 3 minutes or $6.36 for a primary care visit, 3 minutes or $10.97 for an emergency department visit, 5 minutes or $13.29 for a general inpatient stay, 15 minutes or $51.20 for an ambulatory surgical procedure, and 15 minutes or $51.20 for an inpatient surgical procedure. Of professional revenue, professional billing costs were estimated to represent 14.5% for primary care visits, 25.2% for emergency department visits, 8.0% for general medicine inpatient stays, 13.4% for ambulatory surgical procedures, and 3.1% for inpatient surgical procedures. In a time-driven activity-based costing study in a large academic health care system with a certified electronic health record system, the estimated costs of billing and insurance-related activities ranged from $20 for a primary care visit to $215 for an inpatient surgical procedure. Knowledge of how specific billing and insurance-related activities contribute to administrative costs may help inform policy solutions to reduce these expenses.
Parametric study of helicopter aircraft systems costs and weights
NASA Technical Reports Server (NTRS)
Beltramo, M. N.
1980-01-01
Weight estimating relationships (WERs) and recurring production cost estimating relationships (CERs) were developed for helicopters at the system level. The WERs estimate system level weight based on performance or design characteristics which are available during concept formulation or the preliminary design phase. The CER (or CERs in some cases) for each system utilize weight (either actual or estimated using the appropriate WER) and production quantity as the key parameters.
Rule-Based Flight Software Cost Estimation
NASA Technical Reports Server (NTRS)
Stukes, Sherry A.; Spagnuolo, John N. Jr.
2015-01-01
This paper discusses the fundamental process for the computation of Flight Software (FSW) cost estimates. This process has been incorporated in a rule-based expert system [1] that can be used for Independent Cost Estimates (ICEs), Proposals, and for the validation of Cost Analysis Data Requirements (CADRe) submissions. A high-level directed graph (referred to here as a decision graph) illustrates the steps taken in the production of these estimated costs and serves as a basis of design for the expert system described in this paper. Detailed discussions are subsequently given elaborating upon the methodology, tools, charts, and caveats related to the various nodes of the graph. We present general principles for the estimation of FSW using SEER-SEM as an illustration of these principles when appropriate. Since Source Lines of Code (SLOC) is a major cost driver, a discussion of various SLOC data sources for the preparation of the estimates is given together with an explanation of how contractor SLOC estimates compare with the SLOC estimates used by JPL. Obtaining consistency in code counting will be presented as well as factors used in reconciling SLOC estimates from different code counters. When sufficient data is obtained, a mapping into the JPL Work Breakdown Structure (WBS) from the SEER-SEM output is illustrated. For across the board FSW estimates, as was done for the NASA Discovery Mission proposal estimates performed at JPL, a comparative high-level summary sheet for all missions with the SLOC, data description, brief mission description and the most relevant SEER-SEM parameter values is given to illustrate an encapsulation of the used and calculated data involved in the estimates. The rule-based expert system described provides the user with inputs useful or sufficient to run generic cost estimation programs. This system's incarnation is achieved via the C Language Integrated Production System (CLIPS) and will be addressed at the end of this paper.
NASA Technical Reports Server (NTRS)
Hammond, Wesley; Thurston, Marland; Hood, Christopher
1995-01-01
The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.
Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates
NASA Technical Reports Server (NTRS)
Peffley, Al F.
1991-01-01
The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.
NASA Astrophysics Data System (ADS)
Rhodes, Russel E.; Byrd, Raymond J.
1998-01-01
This paper presents a ``back of the envelope'' technique for fast, timely, on-the-spot, assessment of affordability (profitability) of commercial space transportation architectural concepts. The tool presented here is not intended to replace conventional, detailed costing methodology. The process described enables ``quick look'' estimations and assumptions to effectively determine whether an initial concept (with its attendant cost estimating line items) provides focus for major leapfrog improvement. The Cost Charts Users Guide provides a generic sample tutorial, building an approximate understanding of the basic launch system cost factors and their representative magnitudes. This process will enable the user to develop a net ``cost (and price) per payload-mass unit to orbit'' incorporating a variety of significant cost drivers, supplemental to basic vehicle cost estimates. If acquisition cost and recurring cost factors (as a function of cost per payload-mass unit to orbit) do not meet the predetermined system-profitability goal, the concept in question will be clearly seen as non-competitive. Multiple analytical approaches, and applications of a variety of interrelated assumptions, can be examined in a quick, (on-the-spot) cost approximation analysis as this tool has inherent flexibility. The technique will allow determination of concept conformance to system objectives.
Statistical methods of estimating mining costs
Long, K.R.
2011-01-01
Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.
Cost and performance model for redox flow batteries
NASA Astrophysics Data System (ADS)
Viswanathan, Vilayanur; Crawford, Alasdair; Stephenson, David; Kim, Soowhan; Wang, Wei; Li, Bin; Coffey, Greg; Thomsen, Ed; Graff, Gordon; Balducci, Patrick; Kintner-Meyer, Michael; Sprenkle, Vincent
2014-02-01
A cost model is developed for all vanadium and iron-vanadium redox flow batteries. Electrochemical performance modeling is done to estimate stack performance at various power densities as a function of state of charge and operating conditions. This is supplemented with a shunt current model and a pumping loss model to estimate actual system efficiency. The operating parameters such as power density, flow rates and design parameters such as electrode aspect ratio and flow frame channel dimensions are adjusted to maximize efficiency and minimize capital costs. Detailed cost estimates are obtained from various vendors to calculate cost estimates for present, near-term and optimistic scenarios. The most cost-effective chemistries with optimum operating conditions for power or energy intensive applications are determined, providing a roadmap for battery management systems development for redox flow batteries. The main drivers for cost reduction for various chemistries are identified as a function of the energy to power ratio of the storage system. Levelized cost analysis further guide suitability of various chemistries for different applications.
Costs And Savings Associated With Community Water Fluoridation In The United States.
O'Connell, Joan; Rockell, Jennifer; Ouellet, Judith; Tomar, Scott L; Maas, William
2016-12-01
The most comprehensive study of US community water fluoridation program benefits and costs was published in 2001. This study provides updated estimates using an economic model that includes recent data on program costs, dental caries increments, and dental treatments. In 2013 more than 211 million people had access to fluoridated water through community water systems serving 1,000 or more people. Savings associated with dental caries averted in 2013 as a result of fluoridation were estimated to be $32.19 per capita for this population. Based on 2013 estimated costs ($324 million), net savings (savings minus costs) from fluoridation systems were estimated to be $6,469 million and the estimated return on investment, 20.0. While communities should assess their specific costs for continuing or implementing a fluoridation program, these updated findings indicate that program savings are likely to exceed costs. Project HOPE—The People-to-People Health Foundation, Inc.
Cost estimate of electricity produced by TPV
NASA Astrophysics Data System (ADS)
Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens
2003-05-01
A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).
Jiwani, Aliya; Himmelstein, David; Woolhandler, Steffie; Kahn, James G
2014-11-13
The United States' multiple-payer health care system requires substantial effort and costs for administration, with billing and insurance-related (BIR) activities comprising a large but incompletely characterized proportion. A number of studies have quantified BIR costs for specific health care sectors, using micro-costing techniques. However, variation in the types of payers, providers, and BIR activities across studies complicates estimation of system-wide costs. Using a consistent and comprehensive definition of BIR (including both public and private payers, all providers, and all types of BIR activities), we synthesized and updated available micro-costing evidence in order to estimate total and added BIR costs for the U.S. health care system in 2012. We reviewed BIR micro-costing studies across healthcare sectors. For physician practices, hospitals, and insurers, we estimated the % BIR using existing research and publicly reported data, re-calculated to a standard and comprehensive definition of BIR where necessary. We found no data on % BIR in other health services or supplies settings, so extrapolated from known sectors. We calculated total BIR costs in each sector as the product of 2012 U.S. national health expenditures and the percentage of revenue used for BIR. We estimated "added" BIR costs by comparing total BIR costs in each sector to those observed in existing, simplified financing systems (Canada's single payer system for providers, and U.S. Medicare for insurers). Due to uncertainty in inputs, we performed sensitivity analyses. BIR costs in the U.S. health care system totaled approximately $471 ($330 - $597) billion in 2012. This includes $70 ($54 - $76) billion in physician practices, $74 ($58 - $94) billion in hospitals, an estimated $94 ($47 - $141) billion in settings providing other health services and supplies, $198 ($154 - $233) billion in private insurers, and $35 ($17 - $52) billion in public insurers. Compared to simplified financing, $375 ($254 - $507) billion, or 80%, represents the added BIR costs of the current multi-payer system. A simplified financing system in the U.S. could result in cost savings exceeding $350 billion annually, nearly 15% of health care spending.
Cost Estimation of Naval Ship Acquisition.
1983-12-01
one a 9-sub- system model , the other a single total cost model . The models were developed using the linear least squares regression tech- nique with...to Linear Statistical Models , McGraw-Hill, 1961. 11. Helmer, F. T., Bibliography on Pricing Methodology and Cost Estimating, Dept. of Economics and...SUPPI.EMSaTARY NOTES IS. KWRo" (Cowaft. en tever aide of ..aesep M’ Idab~t 6 Week ONNa.) Cost estimation; Acquisition; Parametric cost estimate; linear
Comparative analysis for various redox flow batteries chemistries using a cost performance model
NASA Astrophysics Data System (ADS)
Crawford, Alasdair; Viswanathan, Vilayanur; Stephenson, David; Wang, Wei; Thomsen, Edwin; Reed, David; Li, Bin; Balducci, Patrick; Kintner-Meyer, Michael; Sprenkle, Vincent
2015-10-01
The total energy storage system cost is determined by means of a robust performance-based cost model for multiple flow battery chemistries. Systems aspects such as shunt current losses, pumping losses and various flow patterns through electrodes are accounted for. The system cost minimizing objective function determines stack design by optimizing the state of charge operating range, along with current density and current-normalized flow. The model cost estimates are validated using 2-kW stack performance data for the same size electrodes and operating conditions. Using our validated tool, it has been demonstrated that an optimized all-vanadium system has an estimated system cost of < 350 kWh-1 for 4-h application. With an anticipated decrease in component costs facilitated by economies of scale from larger production volumes, coupled with performance improvements enabled by technology development, the system cost is expected to decrease to 160 kWh-1 for a 4-h application, and to 100 kWh-1 for a 10-h application. This tool has been shared with the redox flow battery community to enable cost estimation using their stack data and guide future direction.
A quality-based cost model for new electronic systems and products
NASA Astrophysics Data System (ADS)
Shina, Sammy G.; Saigal, Anil
1998-04-01
This article outlines a method for developing a quality-based cost model for the design of new electronic systems and products. The model incorporates a methodology for determining a cost-effective design margin allocation for electronic products and systems and its impact on manufacturing quality and cost. A spreadsheet-based cost estimating tool was developed to help implement this methodology in order for the system design engineers to quickly estimate the effect of design decisions and tradeoffs on the quality and cost of new products. The tool was developed with automatic spreadsheet connectivity to current process capability and with provisions to consider the impact of capital equipment and tooling purchases to reduce the product cost.
Proposed Reliability/Cost Model
NASA Technical Reports Server (NTRS)
Delionback, L. M.
1982-01-01
New technique estimates cost of improvement in reliability for complex system. Model format/approach is dependent upon use of subsystem cost-estimating relationships (CER's) in devising cost-effective policy. Proposed methodology should have application in broad range of engineering management decisions.
NASA Astrophysics Data System (ADS)
Teeples, Ronald; Glyer, David
1987-05-01
Both policy and technical analysis of water delivery systems have been based on cost functions that are inconsistent with or are incomplete representations of the neoclassical production functions of economics. We present a full-featured production function model of water delivery which can be estimated from a multiproduct, dual cost function. The model features implicit prices for own-water inputs and is implemented as a jointly estimated system of input share equations and a translog cost function. Likelihood ratio tests are performed showing that a minimally constrained, full-featured production function is a necessary specification of the water delivery operations in our sample. This, plus the model's highly efficient and economically correct parameter estimates, confirms the usefulness of a production function approach to modeling the economic activities of water delivery systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... total acquisition costs (for information technology, life cycle costs) are estimated to be $50 million or more, or (b) The system, regardless of estimated acquisition or life cycle costs, has been...
Code of Federal Regulations, 2014 CFR
2014-10-01
... total acquisition costs (for information technology, life cycle costs) are estimated to be $50 million or more, or (b) The system, regardless of estimated acquisition or life cycle costs, has been...
Code of Federal Regulations, 2013 CFR
2013-10-01
... total acquisition costs (for information technology, life cycle costs) are estimated to be $50 million or more, or (b) The system, regardless of estimated acquisition or life cycle costs, has been...
Code of Federal Regulations, 2012 CFR
2012-10-01
... total acquisition costs (for information technology, life cycle costs) are estimated to be $50 million or more, or (b) The system, regardless of estimated acquisition or life cycle costs, has been...
NASA Instrument Cost/Schedule Model
NASA Technical Reports Server (NTRS)
Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George
2011-01-01
NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.
Cost analysis of carbon dioxide concentrators
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1972-01-01
A methodology is developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware and is used to predict the costs of three carbon dioxide concentration systems. The cost and performance data from Gemini, Skylab, and other programs are utilized as a basis for establishing the cost estimating relationships. The concentration systems analyzed are the molecular sieves C02 concentrator, the hydrogen-depolarized concentrator, and the regenerable solid desiccant concentrator. Besides the cost estimates for each system, their comparative criteria including relative characteristics, operational differences, and development status are considered.
Cost analysis and facility reimbursement in the long-term health care industry.
Ullmann, S G
1984-01-01
This article examines costs and develops a system of prospective reimbursement for the industry committed to long-term health care. Together with estimates of average cost functions--for purposes of determining those factors affecting the costs of long-term health care, the author examines in depth the cost effects of patient mix and facility quality. Policy implications are indicated. The article estimates cost savings and predicted improvements in facility performance resulting from adoption of a prospective reimbursement system. PMID:6427138
Do case-mix adjusted nursing home reimbursements actually reflect costs? Minnesota's experience.
Nyman, J A; Connor, R A
1994-07-01
Some states have adopted Medicaid reimbursement systems that pay nursing homes according to patient type. These case-mix adjusted reimbursements are intended in part to eliminate the incentive in prospective systems to exclude less profitable patients. This study estimates the marginal costs of different patient types under Minnesota's case-mix system and compares them to their corresponding reimbursements. We find that estimated costs do not match reimbursement rates, again making some patient types less profitable than others. Further, in confirmation of our estimates, we find that the percentage change in patient days between 1986 and 1990 is explained by our profitability estimates.
Costing for the Future: Exploring Cost Estimation With Unmanned Autonomous Systems
2016-04-30
account for how cost estimating for autonomy is different than current methodologies and to suggest ways it can be addressed through the integration and...The Development stage involves refining the system requirements, creating a solution description , and building a system. 3. The Operational Test...parameter describes the extent to which efficient fabrication methodologies and processes are used, and the automation of labor-intensive operations
On a Formal Tool for Reasoning About Flight Software Cost Analysis
NASA Technical Reports Server (NTRS)
Spagnuolo, John N., Jr.; Stukes, Sherry A.
2013-01-01
A report focuses on the development of flight software (FSW) cost estimates for 16 Discovery-class missions at JPL. The techniques and procedures developed enabled streamlining of the FSW analysis process, and provided instantaneous confirmation that the data and processes used for these estimates were consistent across all missions. The research provides direction as to how to build a prototype rule-based system for FSW cost estimation that would provide (1) FSW cost estimates, (2) explanation of how the estimates were arrived at, (3) mapping of costs, (4) mathematical trend charts with explanations of why the trends are what they are, (5) tables with ancillary FSW data of interest to analysts, (6) a facility for expert modification/enhancement of the rules, and (7) a basis for conceptually convenient expansion into more complex, useful, and general rule-based systems.
Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned
NASA Technical Reports Server (NTRS)
Battle, Rick; Cole, Lance
2015-01-01
To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for the potential providers for each annual PPBE submit from 2009-2014. This paper describes the cost estimating processes used, challenges and lessons learned to develop estimates for this key NASA project that diverted from the traditional procurement approach and used a new way of doing business
Cost analysis of carbon dioxide concentrators
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1973-01-01
Methodology and cost estimating relationships, for flight-type and prototype CO2 concentrators, have been developed and presented. A validity check was made by comparing the molecular sieves system considered here and that developed for Skylab. The system evaluated here is twice the size of the Skylab system and is also more complex as it desorbs CO2 thermally and stores it in an accumulator. The cost estimates developed were found to be approximately 50 to 70% higher than the actual cost of the Skylab unit.
Zagar, Agata Karolina; Zagar, Robert John; Bartikowski, Boris; Busch, Kenneth G
2009-02-01
Data from youth studied by Zagar and colleagues were randomly sampled to create groups of controls and abused, delinquent, violent, and homicidal youth (n=30 in each). Estimated costs of raising a nondelinquent youth from birth to 17 yr. were compared with the average costs incurred by other youth in each group. Estimates of living expenses, direct and indirect costs of victimization, and criminal justice system expenditures were summed. Groups differed significantly on total expenses, victimization costs, and criminal justice expenditures. Mean total costs for a homicidal youth were estimated at $3,935,433, while those for a control youth were $150,754. Abused, delinquent, and violent youth had average total expenses roughly double the total mean costs of controls. Prevention of dropout, alcoholism, addiction, career delinquency, or homicide justifies interception and empirical treatment on a cost-benefit basis, but also based on the severe personal costs to the victims and to the youth themselves.
Estimating the Cost of NASA's Space Launch Initiative: How SLI Cost Stack Up Against the Shuttle
NASA Technical Reports Server (NTRS)
Hamaker, Joseph H.; Roth, Axel (Technical Monitor)
2002-01-01
NASA is planning to replace the Space Shuttle with a new completely reusable Second Generation Launch System by approximately 2012. Numerous contracted and NASA in-house Space Transportation Architecture Studies and various technology maturation activities are proceeding and have resulted in scores of competing architecture configurations being proposed. Life cycle cost is a key discriminator between all these various concepts. However, the one obvious analogy for costing purposes remains the current Shuttle system. Are there credible reasons to believe that a second generation reusable launch system can be accomplished at less cost than the Shuttle? The need for a credible answer to this question is critical. This paper reviews the cost estimating approaches being used by the contractors and the government estimators to address this issue and explores the rationale behind the numbers.
Estimating airline operating costs
NASA Technical Reports Server (NTRS)
Maddalon, D. V.
1978-01-01
A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.
Methods and Costs to Achieve Ultra Reliable Life Support
NASA Technical Reports Server (NTRS)
Jones, Harry W.
2012-01-01
A published Mars mission is used to explore the methods and costs to achieve ultra reliable life support. The Mars mission and its recycling life support design are described. The life support systems were made triply redundant, implying that each individual system will have fairly good reliability. Ultra reliable life support is needed for Mars and other long, distant missions. Current systems apparently have insufficient reliability. The life cycle cost of the Mars life support system is estimated. Reliability can be increased by improving the intrinsic system reliability, adding spare parts, or by providing technically diverse redundant systems. The costs of these approaches are estimated. Adding spares is least costly but may be defeated by common cause failures. Using two technically diverse systems is effective but doubles the life cycle cost. Achieving ultra reliability is worth its high cost because the penalty for failure is very high.
Cost of heat from a seasonal source
NASA Astrophysics Data System (ADS)
Reilly, R. W.; Brown, D. R.; Huber, H. D.
Results are reported of an investigation to estimate the cost of aquifer thermal energy storage (ATES) from a seasonal heat source. The cost of supplying energy (hot water) from an ATES system is estimated. Three types of loads are investigated: point demands, residential developments, and a multidistrict city. Several technical and economic factors are found to control the economic performance of an ATES system. Costs are found to be prohibitive for systems of small size, long transmission distances, and employing expensive purchased thermal energy. ATES is found to be cost-competitive with oil-fired and electric hot water delivery systems under a broad range of potential situations.
Estimating two indirect logging costs caused by accelerated erosion.
Glen O. Klock
1976-01-01
In forest areas where high soil erosion potential exists, a comparative yarding cost estimate, including the indirect costs determined by methods proposed here, shows that the total cost of using "advanced" logging methods may be less than that of "traditional" systems.
1975-06-01
the Air Force Flight Dynamics Laboratory for use in conceptual and preliminary designs pauses of weapon system development. The methods are a...trade study method provides ai\\ iterative capability stemming from a direct interface with design synthesis programs. A detailed cost data base ;ind...system for data expmjsion is provided. The methods are designed for ease in changing cost estimating relationships and estimating coefficients
Systems engineering and integration: Cost estimation and benefits analysis
NASA Technical Reports Server (NTRS)
Dean, ED; Fridge, Ernie; Hamaker, Joe
1990-01-01
Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.
Space Tug Docking Study. Volume 5: Cost Analysis
NASA Technical Reports Server (NTRS)
1976-01-01
The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.
Childhood Secondhand Smoke Exposure and ADHD-Attributable Costs to the Health and Education System
ERIC Educational Resources Information Center
Max, Wendy; Sung, Hai-Yen; Shi, Yanling
2014-01-01
Background: Children exposed to secondhand smoke (SHS) have higher rates of behavioral and cognitive effects, including attention deficit hyperactivity disorder (ADHD), but the costs to the health care and education systems have not been estimated. We estimate these costs for school-aged children aged 5-15. Methods: The relative risk (RR) of ADHD…
Estimating the costs of VA ambulatory care.
Phibbs, Ciaran S; Bhandari, Aman; Yu, Wei; Barnett, Paul G
2003-09-01
This article reports how we matched Common Procedure Terminology (CPT) codes with Medicare payment rates and aggregate Veterans Affairs (VA) budget data to estimate the costs of every VA ambulatory encounter. Converting CPT codes to encounter-level costs was more complex than a simple match of Medicare reimbursements to CPT codes. About 40 percent of the CPT codes used in VA, representing about 20 percent of procedures, did not have a Medicare payment rate and required other cost estimates. Reconciling aggregated estimated costs to the VA budget allocations for outpatient care produced final VA cost estimates that were lower than projected Medicare reimbursements. The methods used to estimate costs for encounters could be replicated for other settings. They are potentially useful for any system that does not generate billing data, when CPT codes are simpler to collect than billing data, or when there is a need to standardize cost estimates across data sources.
Cost projections for Redox Energy storage systems
NASA Technical Reports Server (NTRS)
Michaels, K.; Hall, G.
1980-01-01
A preliminary design and system cost analysis was performed for the redox energy storage system. A conceptual design and cost estimate was prepared for each of two energy applications: (1) electric utility 100-MWh requirement (10-MW for ten hours) for energy storage for utility load leveling application, and (2) a 500-kWh requirement (10-kW for 50 hours) for use with a variety of residential or commercial applications, including stand alone solar photovoltaic systems. The conceptual designs were based on cell performance levels, system design parameters, and special material costs. These data were combined with estimated thermodynamic and hydraulic analysis to provide preliminary system designs. Results indicate that the redox cell stack to be amenable to mass production techniques with a relatively low material cost.
Plantation thinning systems in the Southern United States
Bryce J. Stokes; William F. Watson
1996-01-01
This paper reviews southern pine management and thinning practices, describes three harvesting systems for thinning, and presents production and cost estimates, and utilization rates. The costs and product recoveries were developed from published sources using a spreadsheet analysis. Systems included tree-length, flail/chip, and cut-to-length. The estimated total...
Holmes, Lisa; Landsverk, John; Ward, Harriet; Rolls-Reutz, Jennifer; Saldana, Lisa; Wulczyn, Fred; Chamberlain, Patricia
2014-04-01
Estimating costs in child welfare services is critical as new service models are incorporated into routine practice. This paper describes a unit costing estimation system developed in England (cost calculator) together with a pilot test of its utility in the United States where unit costs are routinely available for health services but not for child welfare services. The cost calculator approach uses a unified conceptual model that focuses on eight core child welfare processes. Comparison of these core processes in England and in four counties in the United States suggests that the underlying child welfare processes generated from England were perceived as very similar by child welfare staff in California county systems with some exceptions in the review and legal processes. Overall, the adaptation of the cost calculator for use in the United States child welfare systems appears promising. The paper also compares the cost calculator approach to the workload approach widely used in the United States and concludes that there are distinct differences between the two approaches with some possible advantages to the use of the cost calculator approach, especially in the use of this method for estimating child welfare costs in relation to the incorporation of evidence-based interventions into routine practice.
System-of-Systems Technology-Portfolio-Analysis Tool
NASA Technical Reports Server (NTRS)
O'Neil, Daniel; Mankins, John; Feingold, Harvey; Johnson, Wayne
2012-01-01
Advanced Technology Life-cycle Analysis System (ATLAS) is a system-of-systems technology-portfolio-analysis software tool. ATLAS affords capabilities to (1) compare estimates of the mass and cost of an engineering system based on competing technological concepts; (2) estimate life-cycle costs of an outer-space-exploration architecture for a specified technology portfolio; (3) collect data on state-of-the-art and forecasted technology performance, and on operations and programs; and (4) calculate an index of the relative programmatic value of a technology portfolio. ATLAS facilitates analysis by providing a library of analytical spreadsheet models for a variety of systems. A single analyst can assemble a representation of a system of systems from the models and build a technology portfolio. Each system model estimates mass, and life-cycle costs are estimated by a common set of cost models. Other components of ATLAS include graphical-user-interface (GUI) software, algorithms for calculating the aforementioned index, a technology database, a report generator, and a form generator for creating the GUI for the system models. At the time of this reporting, ATLAS is a prototype, embodied in Microsoft Excel and several thousand lines of Visual Basic for Applications that run on both Windows and Macintosh computers.
SCATS: SRB Cost Accounting and Tracking System handbook
NASA Technical Reports Server (NTRS)
Zorv, R. B.; Stewart, R. D.; Coley, G.; Higginbotham, M.
1978-01-01
The Solid Rocket Booster Cost Accounting and Tracking System (SCATS) which is an automatic data processing system designed to keep a running account of the number, description, and estimated cost of Level 2, 3, and 4 changes is described. Although designed specifically for the Space Shuttle Solid Rocket Booster Program, the ADP system can be used for any other program that has a similar structure for recording, reporting, and summing numbers and costs of changes. The program stores the alpha-numeric designators for changes, government estimated costs, proposed costs, and negotiated value in a MIRADS (Marshall Information Retrieval and Display System) format which permits rapid access, manipulation, and reporting of current change status. Output reports listing all changes, totals of each level, and totals of all levels, can be derived for any calendar interval period.
A Decision Support System for Planning, Control and Auditing of DoD Software Cost Estimation.
1986-03-01
is frequently used in U. S. Air Force software cost estimates. Barry Boehm’s Constructive Cost Estimation Model (COCOMO) was recently selected for use...are considered basic to the proper development of software. Pressman , [Ref. 11], addresses these basic elements in a manner which attempts to integrate...H., Jr., and Carlson, Eric D., Building E fective Decision SUDDOrt Systems, Prentice-Hal, EnglewoodNJ, 1982 11. Pressman , Roger S., o A Practioner’s A
[The cost of tobacco-related diseases for Brazil's Unified National Health System].
Pinto, Márcia; Ugá, Maria Alicia Domínguez
2010-06-01
This study aimed to identify the direct costs of hospitalizations due to three smoking-related groups of diseases - cancer and circulatory and respiratory diseases - in Brazil's Unified National Health System (SUS) in 2005. For cancer, the cost of chemotherapy was also included. The study derived cost estimates using administrative databases, relative risks, smoking prevalence, and smoking-attributable fraction. According to the estimates, smoking- attributable medical expenditures for the three disease groups amounted to R$338,692,516.02 (approximately U$185 million), accounting for 27.6% of total medical expenditures. Considering all hospitalizations and chemotherapy provided by the National Health System, tobacco-related diseases accounted for 7.7% of total medical expenditures. These costs also represented 0.9% of expenditures by federally funded public health services. This study provides a conservative estimate of smoking-related costs and suggests the need for continued research on comprehensive approaches to measure the total burden of smoking for society.
Parametric Cost Analysis: A Design Function
NASA Technical Reports Server (NTRS)
Dean, Edwin B.
1989-01-01
Parametric cost analysis uses equations to map measurable system attributes into cost. The measures of the system attributes are called metrics. The equations are called cost estimating relationships (CER's), and are obtained by the analysis of cost and technical metric data of products analogous to those to be estimated. Examples of system metrics include mass, power, failure_rate, mean_time_to_repair, energy _consumed, payload_to_orbit, pointing_accuracy, manufacturing_complexity, number_of_fasteners, and percent_of_electronics_weight. The basic assumption is that a measurable relationship exists between system attributes and the cost of the system. If a function exists, the attributes are cost drivers. Candidates for metrics include system requirement metrics and engineering process metrics. Requirements are constraints on the engineering process. From optimization theory we know that any active constraint generates cost by not permitting full optimization of the objective. Thus, requirements are cost drivers. Engineering processes reflect a projection of the requirements onto the corporate culture, engineering technology, and system technology. Engineering processes are an indirect measure of the requirements and, hence, are cost drivers.
NASA Technical Reports Server (NTRS)
Bronstein, L. M.
1979-01-01
The use of the 18 and 30 GHz bands for fixed service satellite communications is examined. The cost and performance expected of 18 and 30 GHz hardware is assessed, selected trunking and direct to user concepts are optimized, and the cost of these systems are estimated. The effect of rain attenuation on the technical and economic viability of the system and methods circumventing the problem are discussed. Technology developments are investigated and cost estimates of these developments are presented.
1983-09-01
Science, Art, or Witchcraft ?" which summarizes the state of the art and describes some important issues in planning level estimates in water resources...REPORT: AD#: P1o 902 TITLE:Panning Level Cost Estimating--Science, Art, or Witchcraft . P01 903 Planning Water Supply Projects: The Systems Estimate...OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 PLANNING LEVEL COST ESTIMATING--SCIENCE, ART, OR WITCHCRAFT by * PLANNING WATER
Costs of Fetal Alcohol Spectrum Disorder in the Canadian Criminal Justice System.
Thanh, Nguyen Xuan; Jonsson, Egon
2015-01-01
We reviewed literature to estimate the costs of Fetal Alcohol Spectrum Disorder (FASD) in the Canadian Criminal Justice System (CJS), and to update the total costs of FASD in Canada. The results suggest FASD is costlier than previous estimates. The costs of FASD associated with the CJS are estimated at $3.9 billion a year, with $1.2 billion for police, $0.4 billion for court, $0.5 billion for correctional services, $1.6 billion for victims, and $0.2 billion for third-party. The updated total costs of FASD in Canada are $9.7 billion a year, of which CJS accounts for 40%, healthcare 21%, education 17%, social services 13%, and others 9%.
Fuzzy/Neural Software Estimates Costs of Rocket-Engine Tests
NASA Technical Reports Server (NTRS)
Douglas, Freddie; Bourgeois, Edit Kaminsky
2005-01-01
The Highly Accurate Cost Estimating Model (HACEM) is a software system for estimating the costs of testing rocket engines and components at Stennis Space Center. HACEM is built on a foundation of adaptive-network-based fuzzy inference systems (ANFIS) a hybrid software concept that combines the adaptive capabilities of neural networks with the ease of development and additional benefits of fuzzy-logic-based systems. In ANFIS, fuzzy inference systems are trained by use of neural networks. HACEM includes selectable subsystems that utilize various numbers and types of inputs, various numbers of fuzzy membership functions, and various input-preprocessing techniques. The inputs to HACEM are parameters of specific tests or series of tests. These parameters include test type (component or engine test), number and duration of tests, and thrust level(s) (in the case of engine tests). The ANFIS in HACEM are trained by use of sets of these parameters, along with costs of past tests. Thereafter, the user feeds HACEM a simple input text file that contains the parameters of a planned test or series of tests, the user selects the desired HACEM subsystem, and the subsystem processes the parameters into an estimate of cost(s).
Direct costs of osteoporosis and hip fracture: an analysis for the Mexican healthcare system.
Clark, P; Carlos, F; Barrera, C; Guzman, J; Maetzel, A; Lavielle, P; Ramirez, E; Robinson, V; Rodriguez-Cabrera, R; Tamayo, J; Tugwell, P
2008-03-01
This study reports the direct costs related to osteoporosis and hip fractures paid for governmental and private institutions in the Mexican health system and estimates the impact of these entities on Mexico. We conclude that the economic burden due to the direct costs of hip fracture justifies wide-scale prevention programs for osteoporosis (OP). To estimate the total direct costs of OP and hip fractures in the Mexican Health care system, a sample of governmental and private institutions were studied. Information was gathered through direct questionnaires in 275 OP patients and 218 hip fracture cases. Additionally, a chart review was conducted and experts' opinions obtained to get accurate protocol scenarios for diagnoses and treatment of OP with no fracture. Microcosting and activity-based costing techniques were used to yield unit costs. The total direct costs for OP and hip fracture were estimated for 2006 based on the projected annual incidence of hip fractures in Mexico. A total of 22,233 hip fracture cases were estimated for 2006 with a total cost to the healthcare system of US$ 97,058,159 for the acute treatment alone ($4,365.50 per case). We found considerable differences in costs and the way the patients were treated across the different health sectors within the country. Costs of the acute treatment of hip fractures in Mexico are high and are expected to increase with the predicted increment of life expectancy and the number of elderly in our population.
NASA Technical Reports Server (NTRS)
Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack
1998-01-01
An innovative approach to autonomous attitude and trajectory estimation is available using only magnetic field data and rate data. The estimation is performed simultaneously using an Extended Kalman Filter, a well known algorithm used extensively in onboard applications. The magnetic field is measured on a satellite by a magnetometer, an inexpensive and reliable sensor flown on virtually all satellites in low earth orbit. Rate data is provided by a gyro, which can be costly. This system has been developed and successfully tested in a post-processing mode using magnetometer and gyro data from 4 satellites supported by the Flight Dynamics Division at Goddard. In order for this system to be truly low cost, an alternative source for rate data must be utilized. An independent system which estimate spacecraft rate has been successfully developed and tested using only magnetometer data or a combination of magnetometer data and sun sensor data, which is less costly than a gyro. This system also uses an Extended Kalman Filter. Merging the two systems will provide an extremely low cost, autonomous approach to attitude and trajectory estimation. In this work we provide the theoretical background of the combined system. The measurement matrix is developed by combining the measurement matrix of the orbit and attitude estimation EKF with the measurement matrix of the rate estimation EKF, which is composed of a pseudo-measurement which makes the effective measurement a function of the angular velocity. Associated with this is the development of the noise covariance matrix associated with the original measurement combined with the new pseudo-measurement. In addition, the combination of the dynamics from the two systems is presented along with preliminary test results.
NASA Technical Reports Server (NTRS)
Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack
1998-01-01
An innovative approach to autonomous attitude and trajectory estimation is available using only magnetic field data and rate data. The estimation is performed simultaneously using an Extended Kalman Filter (EKF), a well known algorithm used extensively in onboard applications. The magnetic field is measured on a satellite by a magnetometer, an inexpensive and reliable sensor flown on virtually all satellites in low earth orbit. Rate data is provided by a gyro, which can be costly. This system has been developed and successfully tested in a post-processing mode using magnetometer and gyro data from 4 satellites supported by the Flight Dynamics Division at Goddard. In order for this system to be truly low cost, an alternative source for rate data must be utilized. An independent system which estimates spacecraft rate has been successfully developed and tested using only magnetometer data or a combination of magnetometer data and sun sensor data, which is less costly than a gyro. This system also uses an EKF. Merging the two systems will provide an extremely low cost, autonomous approach to attitude and trajectory estimation. In this work we provide the theoretical background of the combined system. The measurement matrix is developed by combining the measurement matrix of the orbit and attitude estimation EKF with the measurement matrix of the rate estimation EKF, which is composed of a pseudo-measurement which makes the effective measurement a function of the angular velocity. Associated with this is the development of the noise covariance matrix associated with the original measurement combined with the new pseudo-measurement. In addition, the combination of the dynamics from the two systems is presented along with preliminary test results.
Carter, Patrick M; Flannagan, Carol A C; Bingham, C Raymond; Cunningham, Rebecca M; Rupp, Jonathan D
2015-05-01
We estimated the injury prevention impact and cost savings associated with alcohol interlock installation in all new US vehicles. We identified fatal and nonfatal injuries associated with drinking driver vehicle crashes from the Fatality Analysis Reporting System and National Automotive Sampling System's General Estimates System data sets (2006-2010). We derived the estimated impact of universal interlock installation using an estimate of the proportion of alcohol-related crashes that were preventable in vehicles < 1 year-old. We repeated this analysis for each subsequent year, assuming a 15-year implementation. We applied existing crash-induced injury cost metrics to approximate economic savings, and we used a sensitivity analysis to examine results with varying device effectiveness. Over 15 years, 85% of crash fatalities (> 59 000) and 84% to 88% of nonfatal injuries (> 1.25 million) attributed to drinking drivers would be prevented, saving an estimated $342 billion in injury-related costs, with the greatest injury and cost benefit realized among recently legal drinking drivers. Cost savings outweighed installation costs after 3 years, with the policy remaining cost effective provided device effectiveness remained above approximately 25%. Alcohol interlock installation in all new vehicles is likely a cost-effective primary prevention policy that will substantially reduce alcohol-involved crash fatalities and injuries, especially among young vulnerable drivers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...
1988-09-01
20 SLIM . . . . .e & . . . . . . . . . . . . 24 SoftCost-R . . . . . . . . . . . . . . . 26 SPQR /20 . . . . . . . . . . .*. . . . . 28...PRICB-8 . . . . . . . . . . .. . 83 softCost-R ............. 84 SPQR /20 . . . . . . . . . . . . 0 . 84 System-3 . . . . . . . . . . . . . . 85 Summry...128 Appendix G: SoftCost-R Input Values . . . . . . . . . . 129 Appendix H: SoftCost-R Resources Estimate . . . . . . . 131 Appendix I: SPQR
The Launch Systems Operations Cost Model
NASA Technical Reports Server (NTRS)
Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)
2001-01-01
One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.
NASA Technical Reports Server (NTRS)
1980-01-01
The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.
Cost-estimating relationships for space programs
NASA Technical Reports Server (NTRS)
Mandell, Humboldt C., Jr.
1992-01-01
Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.
Unaffordable or cost-effective?: introducing an emergency referral system in rural Niger.
Bossyns, Paul; Abache, Ranaou; Abdoulaye, Mahaman Sani; Lerberghe, Wim Van
2005-09-01
An important investment was made in two health districts in Niger to organize an emergency referral system. This study estimates its impact and cost-effectiveness in relation with external determinants. After installing a solar radio network in the health centres, emergency calls and related data were monitored over 7 years and investment and recurrent costs for the system were estimated. The number of emergency calls increased significantly in both districts. In 2003, the total yearly cost for the district amounted to US dollars 14,147, the cost per useful and successful call was US dollars 49 and the cost per inhabitant and per year was about US dollars 0.06. The impressive and immediate impact on the health system, the relatively low recurrent cost and the minimal management requirements for the health service make the investment very worthwhile. Organizing emergency evacuation systems should be a priority for any health district in the world.
Cost analysis of an integrated vaccine-preventable disease surveillance system in Costa Rica.
Toscano, C M; Vijayaraghavan, M; Salazar-Bolaños, H M; Bolaños-Acuña, H M; Ruiz-González, A I; Barrantes-Solis, T; Fernández-Vargas, I; Panero, M S; de Oliveira, L H; Hyde, T B
2013-07-02
Following World Health Organization recommendations set forth in the Global Framework for Immunization Monitoring and Surveillance, Costa Rica in 2009 became the first country to implement integrated vaccine-preventable disease (iVPD) surveillance, with support from the U.S. Centers for Disease Control and Prevention (CDC) and the Pan American Health Organization (PAHO). As surveillance for diseases prevented by new vaccines is integrated into existing surveillance systems, these systems could cost more than routine surveillance for VPDs targeted by the Expanded Program on Immunization. We estimate the costs associated with establishing and subsequently operating the iVPD surveillance system at a pilot site in Costa Rica. We retrospectively collected data on costs incurred by the institutions supporting iVPD surveillance during the preparatory (January 2007 through August 2009) and implementation (September 2009 through August 2010) phases of the iVPD surveillance project in Costa Rica. These data were used to estimate costs for personnel, meetings, infrastructure, office equipment and supplies, transportation, and laboratory facilities. Costs incurred by each of the collaborating institutions were also estimated. During the preparatory phase, the estimated total cost was 128,000 U.S. dollars (US$), including 64% for personnel costs. The preparatory phase was supported by CDC and PAHO. The estimated cost for 1 year of implementation was US$ 420,000, including 58% for personnel costs, 28% for laboratory costs, and 14% for meeting, infrastructure, office, and transportation costs combined. The national reference laboratory and the PAHO Costa Rica office incurred 64% of total costs, and other local institutions supporting iVPD surveillance incurred the remaining 36%. Countries planning to implement iVPD surveillance will require adequate investments in human resources, laboratories, data management, reporting, and investigation. Our findings will be valuable for decision makers and donors planning and implementing similar strategies in other countries. Copyright © 2013 Elsevier Ltd. All rights reserved.
Cost analysis of an integrated vaccine-preventable disease surveillance system in Costa Rica✩
Toscano, C.M.; Vijayaraghavan, M.; Salazar-Bolaños, H.M.; Bolaños-Acuña, H.M.; Ruiz-González, A.I.; Barrantes-Solis, T.; Fernández-Vargas, I.; Panero, M.S.; de Oliveira, L.H.; Hyde, T.B.
2015-01-01
Introduction Following World Health Organization recommendations set forth in the Global Framework for Immunization Monitoring and Surveillance, Costa Rica in 2009 became the first country to implement integrated vaccine-preventable disease (iVPD) surveillance, with support from the U.S. Centers for Disease Control and Prevention (CDC) and the Pan American Health Organization (PAHO). As surveillance for diseases prevented by new vaccines is integrated into existing surveillance systems, these systems could cost more than routine surveillance for VPDs targeted by the Expanded Program on Immunization. Objectives We estimate the costs associated with establishing and subsequently operating the iVPD surveillance system at a pilot site in Costa Rica. Methods We retrospectively collected data on costs incurred by the institutions supporting iVPD surveillance during the preparatory (January 2007 through August 2009) and implementation (September 2009 through August 2010) phases of the iVPD surveillance project in Costa Rica. These data were used to estimate costs for personnel, meetings, infrastructure, office equipment and supplies, transportation, and laboratory facilities. Costs incurred by each of the collaborating institutions were also estimated. Results During the preparatory phase, the estimated total cost was 128,000 U.S. dollars (US$), including 64% for personnel costs. The preparatory phase was supported by CDC and PAHO. The estimated cost for 1 year of implementation was US$ 420,000, including 58% for personnel costs, 28% for laboratory costs, and 14% for meeting, infrastructure, office, and transportation costs combined. The national reference laboratory and the PAHO Costa Rica office incurred 64% of total costs, and other local institutions supporting iVPD surveillance incurred the remaining 36%. Conclusions Countries planning to implement iVPD surveillance will require adequate investments in human resources, laboratories, data management, reporting, and investigation. Our findings will be valuable for decision makers and donors planning and implementing similar strategies in other countries. PMID:23777698
Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.
Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S
2016-06-01
Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.
Adams, Vanessa M.; Segan, Daniel B.; Pressey, Robert L.
2011-01-01
Many governments have recently gone on record promising large-scale expansions of protected areas to meet global commitments such as the Convention on Biological Diversity. As systems of protected areas are expanded to be more comprehensive, they are more likely to be implemented if planners have realistic budget estimates so that appropriate funding can be requested. Estimating financial budgets a priori must acknowledge the inherent uncertainties and assumptions associated with key parameters, so planners should recognize these uncertainties by estimating ranges of potential costs. We explore the challenge of budgeting a priori for protected area expansion in the face of uncertainty, specifically considering the future expansion of protected areas in Queensland, Australia. The government has committed to adding ∼12 million ha to the reserve system, bringing the total area protected to 20 million ha by 2020. We used Marxan to estimate the costs of potential reserve designs with data on actual land value, market value, transaction costs, and land tenure. With scenarios, we explored three sources of budget variability: size of biodiversity objectives; subdivision of properties; and legal acquisition routes varying with tenure. Depending on the assumptions made, our budget estimates ranged from $214 million to $2.9 billion. Estimates were most sensitive to assumptions made about legal acquisition routes for leasehold land. Unexpected costs (costs encountered by planners when real-world costs deviate from assumed costs) responded non-linearly to inability to subdivide and percentage purchase of private land. A financially conservative approach - one that safeguards against large cost increases while allowing for potential financial windfalls - would involve less optimistic assumptions about acquisition and subdivision to allow Marxan to avoid expensive properties where possible while meeting conservation objectives. We demonstrate how a rigorous analysis can inform discussions about the expansion of systems of protected areas, including the identification of factors that influence budget variability. PMID:21980459
Adams, Vanessa M; Segan, Daniel B; Pressey, Robert L
2011-01-01
Many governments have recently gone on record promising large-scale expansions of protected areas to meet global commitments such as the Convention on Biological Diversity. As systems of protected areas are expanded to be more comprehensive, they are more likely to be implemented if planners have realistic budget estimates so that appropriate funding can be requested. Estimating financial budgets a priori must acknowledge the inherent uncertainties and assumptions associated with key parameters, so planners should recognize these uncertainties by estimating ranges of potential costs. We explore the challenge of budgeting a priori for protected area expansion in the face of uncertainty, specifically considering the future expansion of protected areas in Queensland, Australia. The government has committed to adding ∼12 million ha to the reserve system, bringing the total area protected to 20 million ha by 2020. We used Marxan to estimate the costs of potential reserve designs with data on actual land value, market value, transaction costs, and land tenure. With scenarios, we explored three sources of budget variability: size of biodiversity objectives; subdivision of properties; and legal acquisition routes varying with tenure. Depending on the assumptions made, our budget estimates ranged from $214 million to $2.9 billion. Estimates were most sensitive to assumptions made about legal acquisition routes for leasehold land. Unexpected costs (costs encountered by planners when real-world costs deviate from assumed costs) responded non-linearly to inability to subdivide and percentage purchase of private land. A financially conservative approach--one that safeguards against large cost increases while allowing for potential financial windfalls--would involve less optimistic assumptions about acquisition and subdivision to allow Marxan to avoid expensive properties where possible while meeting conservation objectives. We demonstrate how a rigorous analysis can inform discussions about the expansion of systems of protected areas, including the identification of factors that influence budget variability.
Resource Consumption of a Diffusion Model for Prevention Programs: The PROSPER Delivery System
Crowley, Daniel M.; Jones, Damon E.; Greenberg, Mark T.; Feinberg, Mark E.; Spoth, Richard L.
2012-01-01
Purpose To prepare public systems to implement evidence-based prevention programs for adolescents, it is necessary to have accurate estimates of programs’ resource consumption. When evidence-based programs are implemented through a specialized prevention delivery system, additional costs may be incurred during cultivation of the delivery infrastructure. Currently, there is limited research on the resource consumption of such delivery systems and programs. In this article, we describe the resource consumption of implementing the PROSPER (PROmoting School–Community–University Partnerships to Enhance Resilience) delivery system for a period of 5 years in one state, and how the financial and economic costs of its implementation affect local communities as well as the Cooperative Extension and University systems. Methods We used a six-step framework for conducting cost analysis, using a Cost–Procedure–Process–Outcome Analysis model (Yates, Analyzing costs, procedures, processes, and outcomes in human services: An introduction, 1996; Yates, 2009). This method entails defining the delivery System; bounding cost parameters; identifying, quantifying, and valuing systemic resource Consumption, and conducting sensitivity analysis of the cost estimates. Results Our analyses estimated both the financial and economic costs of the PROSPER delivery system. Evaluation of PROSPER illustrated how costs vary over time depending on the primacy of certain activities (e.g., team development, facilitator training, program implementation). Additionally, this work describes how the PROSPER model cultivates a complex resource infrastructure and provides preliminary evidence of systemic efficiencies. Conclusions This work highlights the need to study the costs of diffusion across time and broadens definitions of what is essential for successful implementation. In particular, cost analyses offer innovative methodologies for analyzing the resource needs of prevention systems. PMID:22325131
Estimated annual cost of arterial hypertension treatment in Brazil.
Dib, Murilo W; Riera, Rachel; Ferraz, Marcos B
2010-02-01
To estimate the direct annual cost of systemic arterial hypertension (SAH) treatment in Brazil's public and private health care systems, assess its economic impact on the total health care budget, and determine its proportion of the 2005 gross domestic product (GDP). A decision tree model was used to determine direct costs based on estimated use of various resources in SAH diagnosis and care, including treatment (medication and non-medication), complementary exams, doctor visits, nutritional assessments, and emergency room visits. Estimated direct annual cost of SAH treatment was approximately US$ 398.9 million for the public health care system and US$ 272.7 million for the private system, representing 0.08% of the 2005 GDP (ranging from 0.05% to 0.16%). With total health care expenses comprising about 7.6% of Brazil's GDP, this cost represented 1.11% of overall health care costs (0.62% to 2.06%)-1.43% of total expenses for the Unified Healthcare System (Sistema Unico de Saúde, SUS) (0.79% to 2.75%) and 0.83% of expenses for the private health care system (0.47% to 1.48%). Conclusion. To guarantee public or private health care based on the principles of universality and equality, with limited available resources, efforts must be focused on educating the population on prevention and treatment compliance in diseases such as SAH that require significant health resources.
Using average cost methods to estimate encounter-level costs for medical-surgical stays in the VA.
Wagner, Todd H; Chen, Shuo; Barnett, Paul G
2003-09-01
The U.S. Department of Veterans Affairs (VA) maintains discharge abstracts, but these do not include cost information. This article describes the methods the authors used to estimate the costs of VA medical-surgical hospitalizations in fiscal years 1998 to 2000. They estimated a cost regression with 1996 Medicare data restricted to veterans receiving VA care in an earlier year. The regression accounted for approximately 74 percent of the variance in cost-adjusted charges, and it proved to be robust to outliers and the year of input data. The beta coefficients from the cost regression were used to impute costs of VA medical-surgical hospital discharges. The estimated aggregate costs were reconciled with VA budget allocations. In addition to the direct medical costs, their cost estimates include indirect costs and physician services; both of these were allocated in proportion to direct costs. They discuss the method's limitations and application in other health care systems.
77 FR 12371 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... applicable conventions under the accelerated cost recovery system. DATES: Written comments should be received... INFORMATION: Title: Applicable Conventions Under the Accelerated Cost Recovery System. OMB Number: 1545-1146...-profit organizations, and farms. Estimated Number of Respondents: 700. Estimated Time per Respondent: 6...
Faul, Mark; Wald, Marlena M; Rutland-Brown, Wesley; Sullivent, Ernest E; Sattin, Richard W
2007-12-01
A decade after promulgation of treatment guidelines by the Brain Trauma Foundation (BTF), few studies exist that examine the application of these guidelines for severe traumatic brain injury (TBI) patients. These studies have reported both cost savings and reduced mortality. We projected the results of previous studies of BTF guideline adoption to estimate the impact of widespread adoption across the United States. We used surveillance systems and national surveys to estimate the number of severely injured TBI patients and compared the lifetime costs of BTF adoption to the current state of treatment. After examining the health outcomes and costs, we estimated that a substantial savings in annual medical costs ($262 million), annual rehabilitation costs ($43 million) and lifetime societal costs ($3.84 billion) would be achieved if treatment guidelines were used more routinely. Implementation costs were estimated to be $61 million. The net savings were primarily because of better health outcomes and a decreased burden on lifetime social support systems. We also estimate that mortality would be reduced by 3,607 lives if the guidelines were followed. Widespread adoption of the BTF guidelines for the treatment of severe TBI would result in substantial savings in costs and lives. The majority of cost savings are societal costs. Further validation work to identify the most effective aspects of the BTF guidelines is warranted.
2015-12-01
Physical Configuration Audit for the GMLRS AW was completed at the system level in March 2015. Director of Operational Test and Evaluation Assessment...Confidence Level Confidence Level of cost estimate for current APB: 50% The confidence level used in establishing the cost estimate for GMLRS/GMLRS AW...PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total 0.039 -0.003 0.001 0.001 0.009 0.037 0.000 0.000 0.045
Selected Tether Applications Cost Model
NASA Technical Reports Server (NTRS)
Keeley, Michael G.
1988-01-01
Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.
Parametric study of potential early commercial power plants Task 3-A MHD cost analysis
NASA Technical Reports Server (NTRS)
1983-01-01
The development of costs for an MHD Power Plant and the comparison of these costs to a conventional coal fired power plant are reported. The program is divided into three activities: (1) code of accounts review; (2) MHD pulverized coal power plant cost comparison; (3) operating and maintenance cost estimates. The scope of each NASA code of account item was defined to assure that the recently completed Task 3 capital cost estimates are consistent with the code of account scope. Improvement confidence in MHD plant capital cost estimates by identifying comparability with conventional pulverized coal fired (PCF) power plant systems is undertaken. The basis for estimating the MHD plant operating and maintenance costs of electricity is verified.
Cost of schizophrenia in England.
Mangalore, Roshni; Knapp, Martin
2007-03-01
Despite the wide-ranging financial and social burdens associated with schizophrenia, there have been few cost-of-illness studies of this illness in the UK. To provide up-to-date, prevalence based estimate of all costs associated with schizophrenia for England. A bottom-up approach was adopted. Separate cost estimates were made for people living in private households, institutions, prisons and for those who are homeless. The costs included related to: health and social care, informal care, private expenditures, lost productivity, premature mortality, criminal justice services and other public expenditures such as those by the social security system. Data came from many sources, including the UK-SCAP (Schizophrenia Care and Assessment Program) survey, Psychiatric Morbidity Surveys, Department of Health and government publications. The estimated total societal cost of schizophrenia was 6.7 billion pounds in 2004/05. The direct cost of treatment and care that falls on the public purse was about 2 billion pounds; the burden of indirect costs to the society was huge, amounting to nearly 4.7 billion pounds. Cost of informal care and private expenditures borne by families was 615 million pounds. The cost of lost productivity due to unemployment, absence from work and premature mortality of patients was 3.4 billion pounds. The cost of lost productivity of carers was 32 million pounds. Estimated cost to the criminal justice system was about 1 million pounds. It is estimated that about 570 million pounds will be paid out in benefit payments and the cost of administration associated with this is about 14 million pounds. It is difficult to compare estimates from previous cost-of-illness studies due to differences in the methods, scope of analyses and the range of costs covered. Costs estimated in this study are detailed, cover a comprehensive list of relevant items and allow for different levels of disaggregation. The main limitation of the study is that data came from a variety of secondary sources and some official data publicly available was not the latest. Schizophrenia continues to be a high cost illness because of the range of health needs that people have. Despite the shifting balance of care away from hospital-based care, the health care costs of treating and supporting people with schizophrenia remain high. Decision-makers need to recognise the breadth of economic impacts, well beyond the health system as conventionally defined. For example, as nearly 80% of schizophrenia patients remain unemployed, the cost of lost productivity is especially large. Better measurement of criminal justice services costs, private expenditures borne by families and valuation of lost quality of life could improve the estimates further.
Costs and savings associated with community water fluoridation programs in Colorado.
O'Connell, Joan M; Brunson, Diane; Anselmo, Theresa; Sullivan, Patrick W
2005-11-01
Local, state, and national health policy makers require information on the economic burden of oral disease and the cost-effectiveness of oral health programs to set policies and allocate resources. In this study, we estimate the cost savings associated with community water fluoridation programs (CWFPs) in Colorado and potential cost savings if Colorado communities without fluoridation programs or naturally high fluoride levels were to implement CWFPs. We developed an economic model to compare the costs associated with CWFPs with treatment savings achieved through averted tooth decay. Treatment savings included those associated with direct medical costs and indirect nonmedical costs (i.e., patient time spent on dental visit). We estimated program costs and treatment savings for each water system in Colorado in 2003 dollars. We obtained parameter estimates from published studies, national surveys, and other sources. We calculated net costs for Colorado water systems with existing CWFPs and potential net costs for systems without CWFPs. The analysis includes data for 172 public water systems in Colorado that serve populations of 1000 individuals or more. We used second-order Monte Carlo simulations to evaluate the inherent uncertainty of the model assumptions on the results and report the 95% credible range from the simulation model. We estimated that Colorado CWFPs were associated with annual savings of 148.9 million dollars (credible range, 115.1 million dollars to 187.2 million dollars) in 2003, or an average of 60.78 dollars per person (credible range, 46.97 dollars dollars to 76.41 dollars). We estimated that Colorado would save an additional 46.6 million dollars (credible range, 36.0 dollars to 58.6 dollars million) annually if CWFPs were implemented in the 52 water systems without such programs and for which fluoridation is recommended. Colorado realizes significant annual savings from CWFPs; additional savings and reductions in morbidity could be achieved if fluoridation programs were implemented in other areas.
Parametric study of transport aircraft systems cost and weight
NASA Technical Reports Server (NTRS)
Beltramo, M. N.; Trapp, D. L.; Kimoto, B. W.; Marsh, D. P.
1977-01-01
The results of a NASA study to develop production cost estimating relationships (CERs) and weight estimating relationships (WERs) for commercial and military transport aircraft at the system level are presented. The systems considered correspond to the standard weight groups defined in Military Standard 1374 and are listed. These systems make up a complete aircraft exclusive of engines. The CER for each system (or CERs in several cases) utilize weight as the key parameter. Weights may be determined from detailed weight statements, if available, or by using the WERs developed, which are based on technical and performance characteristics generally available during preliminary design. The CERs that were developed provide a very useful tool for making preliminary estimates of the production cost of an aircraft. Likewise, the WERs provide a very useful tool for making preliminary estimates of the weight of aircraft based on conceptual design information.
Cost analysis of water recovery systems
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1972-01-01
Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced life support subsystems for long range planning in support of earth orbital programs. Cost analysis are presented for five leading water reclamation systems; (1) RITE waste management-water system;(2) reverse osmosis system;(3) multifiltration system;(4) vapor compression system; and(5) closed air evaporation system with electrolytic pretreatment.
Harvesting Costs For Mechanized Thinning Systems In Slash Pine Plantations
James E. Granskog
1978-01-01
Harvesting costs of four tree harvester systems are estimated for row thinning slash pine plantations. Systems incorporating a full-tree type harvester had lower harvesting costs per cord than shortwood and tree-length harvester systems in 15-year-old plantations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard....501 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST...
Estimating costs and performance of systems for machine processing of remotely sensed data
NASA Technical Reports Server (NTRS)
Ballard, R. J.; Eastwood, L. F., Jr.
1977-01-01
This paper outlines a method for estimating computer processing times and costs incurred in producing information products from digital remotely sensed data. The method accounts for both computation and overhead, and may be applied to any serial computer. The method is applied to estimate the cost and computer time involved in producing Level II Land Use and Vegetative Cover Maps for a five-state midwestern region. The results show that the amount of data to be processed overloads some example computer systems, but that the processing is feasible on others.
Investment opportunity : the FPL low-cost solar dry kiln
George B. Harpole
1988-01-01
Two equations are presented that may be used to estimate a maximum investment limit and working capital requirements for the FPL low-cost solar dry kiln systems. The equations require data for drying cycle time, green lumber cost, and kiln-dried lumber costs. Results are intended to provide a preliminary estimate.
1989-07-31
Information System (OSMIS). The long-range objective is to develop methods to determine total operating and support (O&S) costs within life-cycle cost...objective was to assess the feasibility of developing cost estimating relationships (CERs) based on data from the Army Operating and Support Management
Disaster warning system study summary. [cost estimates using NOAA satellites
NASA Technical Reports Server (NTRS)
Leroy, B. F.; Maloy, J. E.; Braley, R. C.; Provencher, C. E.; Schumaker, H. A.; Valgora, M. E.
1977-01-01
A conceptual satellite system to replace or complement NOAA's data collection, internal communications, and public information dissemination systems for the mid-1980's was defined. Program cost and cost sensitivity to variations in communications functions are analyzed.
A LEO Satellite Navigation Algorithm Based on GPS and Magnetometer Data
NASA Technical Reports Server (NTRS)
Deutschmann, Julie; Bar-Itzhack, Itzhack; Harman, Rick; Bauer, Frank H. (Technical Monitor)
2000-01-01
The Global Positioning System (GPS) has become a standard method for low cost onboard satellite orbit determination. The use of a GPS receiver as an attitude and rate sensor has also been developed in the recent past. Additionally, focus has been given to attitude and orbit estimation using the magnetometer, a low cost, reliable sensor. Combining measurements from both GPS and a magnetometer can provide a robust navigation system that takes advantage of the estimation qualities of both measurements. Ultimately a low cost, accurate navigation system can result, potentially eliminating the need for more costly sensors, including gyroscopes.
PACE 2: Pricing and Cost Estimating Handbook
NASA Technical Reports Server (NTRS)
Stewart, R. D.; Shepherd, T.
1977-01-01
An automatic data processing system to be used for the preparation of industrial engineering type manhour and material cost estimates has been established. This computer system has evolved into a highly versatile and highly flexible tool which significantly reduces computation time, eliminates computational errors, and reduces typing and reproduction time for estimators and pricers since all mathematical and clerical functions are automatic once basic inputs are derived.
NASA Astrophysics Data System (ADS)
Bearden, David A.; Duclos, Donald P.; Barrera, Mark J.; Mosher, Todd J.; Lao, Norman Y.
1997-12-01
Emerging technologies and micro-instrumentation are changing the way remote sensing spacecraft missions are developed and implemented. Government agencies responsible for procuring space systems are increasingly requesting analyses to estimate cost, performance and design impacts of advanced technology insertion for both state-of-the-art systems as well as systems to be built 5 to 10 years in the future. Numerous spacecraft technology development programs are being sponsored by Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) agencies with the goal of enhancing spacecraft performance, reducing mass, and reducing cost. However, it is often the case that technology studies, in the interest of maximizing subsystem-level performance and/or mass reduction, do not anticipate synergistic system-level effects. Furthermore, even though technical risks are often identified as one of the largest cost drivers for space systems, many cost/design processes and models ignore effects of cost risk in the interest of quick estimates. To address these issues, the Aerospace Corporation developed a concept analysis methodology and associated software tools. These tools, collectively referred to as the concept analysis and design evaluation toolkit (CADET), facilitate system architecture studies and space system conceptual designs focusing on design heritage, technology selection, and associated effects on cost, risk and performance at the system and subsystem level. CADET allows: (1) quick response to technical design and cost questions; (2) assessment of the cost and performance impacts of existing and new designs/technologies; and (3) estimation of cost uncertainties and risks. These capabilities aid mission designers in determining the configuration of remote sensing missions that meet essential requirements in a cost- effective manner. This paper discuses the development of CADET modules and their application to several remote sensing satellite mission concepts.
Capital cost expenditure of high temperature latent and sensible thermal energy storage systems
NASA Astrophysics Data System (ADS)
Jacob, Rhys; Saman, Wasim; Bruno, Frank
2017-06-01
In the following study cost estimates have been undertaken for an encapsulated phase change material (EPCM) packed bed, a packed bed thermocline and a traditional two-tank molten salt system. The effect of various heat transfer fluids (air and molten salt), system configuration (cascade vs one PCM, and direct vs indirect) and temperature difference (ΔT = 100-500 °C) on the cost estimate of the system was also investigated. Lastly, the storage system boundary was expanded to include heat exchangers, pumps and fans, and heat tracing so that a thorough cost comparison could be undertaken. The results presented in this paper provide a methodology to quickly compare various systems and configurations while providing design limits for the studied technologies.
Costs of Educational Media Systems. A Series II Occasional Paper from ERIC at Stanford.
ERIC Educational Resources Information Center
Sovereign, Michael G.
Investigating the costs of instructional media systems necessitated that those systems be identified and analyzed, and that a methodology be formulated for estimating their costs, with reference to their area of operation: local, city, metropolitan, state, or regional school areas. Costs are broken down into cost per student per year, according to…
Leach, A W; Mumford, J D
2008-01-01
The Pesticide Environmental Accounting (PEA) tool provides a monetary estimate of environmental and health impacts per hectare-application for any pesticide. The model combines the Environmental Impact Quotient method and a methodology for absolute estimates of external pesticide costs in UK, USA and Germany. For many countries resources are not available for intensive assessments of external pesticide costs. The model converts external costs of a pesticide in the UK, USA and Germany to Mediterranean countries. Economic and policy applications include estimating impacts of pesticide reduction policies or benefits from technologies replacing pesticides, such as sterile insect technique. The system integrates disparate data and approaches into a single logical method. The assumptions in the system provide transparency and consistency but at the cost of some specificity and precision, a reasonable trade-off for a method that provides both comparative estimates of pesticide impacts and area-based assessments of absolute impacts.
NASA Technical Reports Server (NTRS)
Levack, Daniel J. H.
2000-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.
1997-09-01
Daly chose five models (REVIC, PRICE-S, SEER, System-4, and SPQR /20) to estimate schedule for 21 separate projects from the Electronic System Division...PRICE-S, two variants of COCOMO, System-3, SPQR /20, SASET, SoftCost-Ada) to 11 eight Ada specific programs. Ada was specifically designed for and is
The social costs of dangerous products: an empirical investigation.
Shapiro, Sidney; Ruttenberg, Ruth; Leigh, Paul
2009-01-01
Defective consumer products impose significant costs on consumers and third parties when they cause fatalities and injuries. This Article develops a novel approach to measuring the true extent of such costs, which may not be accurately captured under current methods of estimating the cost of dangerous products. Current analysis rests on a narrowly defined set of costs, excluding certain types of costs. The cost-of-injury estimates utilized in this Article address this omission by quantifying and incorporating these costs to provide a more complete picture of the true impact of defective consumer products. The new estimates help to gauge the true value of the civil liability system.
Remote Minehunting System (RMS)
2015-12-01
1449.4 1449.4 744.6 Confidence Level Confidence Level of cost estimate for current APB: 50% The Independent Cost Estimate to support the RMS Nunn...which the Derpartment has been successful. It is difficult to calculate mathematically the precise confidence levels associated with life-cycle cost...Baseline (TY $M) Initial PAUC Production Estimate Changes PAUC Development Estimate Econ Qty Sch Eng Est Oth Spt Total 12.957 -0.752 3.262 2.950 0.454
Hubble, Michael W; Richards, Michael E; Wilfong, Denise A
2008-01-01
To estimate the cost-effectiveness of continuous positive airway pressure (CPAP) in managing prehospital acute pulmonary edema in an urban EMS system. Using estimates from published reports on prehospital and emergency department CPAP, a cost-effectiveness model of implementing CPAP in a typical urban EMS system was derived from the societal perspective as well as the perspective of the implementing EMS system. To assess the robustness of the model, a series of univariate and multivariate sensitivity analyses was performed on the input variables. The cost of consumables, equipment, and training yielded a total cost of $89 per CPAP application. The theoretical system would be expected to use CPAP 4 times per 1000 EMS patients and is expected to save 0.75 additional lives per 1000 EMS patients at a cost of $490 per life saved. CPAP is also expected to result in approximately one less intubation per 6 CPAP applications and reduce hospitalization costs by $4075 per year for each CPAP application. Through sensitivity analyses the model was verified to be robust across a wide range of input variable assumptions. Previous studies have demonstrated the clinical effectiveness of CPAP in the management of acute pulmonary edema. Through a theoretical analysis which modeled the costs and clinical benefits of implementing CPAP in an urban EMS system, prehospital CPAP appears to be a cost-effective treatment.
Estimating Software-Development Costs With Greater Accuracy
NASA Technical Reports Server (NTRS)
Baker, Dan; Hihn, Jairus; Lum, Karen
2008-01-01
COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.
Jones, Terry L; Schlegel, Cara
2014-02-01
Accurate, precise, unbiased, reliable, and cost-effective estimates of nursing time use are needed to insure safe staffing levels. Direct observation of nurses is costly, and conventional surrogate measures have limitations. To test the potential of electronic capture of time and motion through real time location systems (RTLS), a pilot study was conducted to assess efficacy (method agreement) of RTLS time use; inter-rater reliability of RTLS time-use estimates; and associated costs. Method agreement was high (mean absolute difference = 28 seconds); inter-rater reliability was high (ICC = 0.81-0.95; mean absolute difference = 2 seconds); and costs for obtaining RTLS time-use estimates on a single nursing unit exceeded $25,000. Continued experimentation with RTLS to obtain time-use estimates for nursing staff is warranted. © 2013 Wiley Periodicals, Inc.
Software Cost-Estimation Model
NASA Technical Reports Server (NTRS)
Tausworthe, R. C.
1985-01-01
Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.
Nelson, Lauren; Valle, Jhaqueline; King, Galatea; Mills, Paul K; Richardson, Maxwell J; Roberts, Eric M; Smith, Daniel; English, Paul
2017-05-01
To estimate the proportion of cases and costs of the most common cancers among children aged 0 to 14 years (leukemia, lymphoma, and brain or central nervous system tumors) that were attributable to preventable environmental pollution in California in 2013. We conducted a literature review to identify preventable environmental hazards associated with childhood cancer. We combined risk estimates with California-specific exposure prevalence estimates to calculate hazard-specific environmental attributable fractions (EAFs). We combined hazard-specific EAFs to estimate EAFs for each cancer and calculated an overall EAF. Estimated economic costs included annual (indirect and direct medical) and lifetime costs. Hazards associated with childhood cancer risks included tobacco smoke, residential exposures, and parental occupational exposures. Estimated EAFs for leukemia, lymphoma, and brain or central nervous system cancer were 21.3% (range = 11.7%-30.9%), 16.1% (range = 15.0%-17.2%), and 2.0% (range = 1.7%-2.2%), respectively. The combined EAF was 15.1% (range = 9.4%-20.7%), representing $18.6 million (range = $11.6 to $25.5 million) in annual costs and $31 million in lifetime costs. Reducing environmental hazards and exposures in California could substantially reduce the human burden of childhood cancer and result in significant annual and lifetime savings.
Ding, Yan; Fei, Yang; Xu, Biao; Yang, Jun; Yan, Weirong; Diwan, Vinod K; Sauerborn, Rainer; Dong, Hengjin
2015-07-25
Studies into the costs of syndromic surveillance systems are rare, especially for estimating the direct costs involved in implementing and maintaining these systems. An Integrated Surveillance System in rural China (ISSC project), with the aim of providing an early warning system for outbreaks, was implemented; village clinics were the main surveillance units. Village doctors expressed their willingness to join in the surveillance if a proper subsidy was provided. This study aims to measure the costs of data collection by village clinics to provide a reference regarding the subsidy level required for village clinics to participate in data collection. We conducted a cross-sectional survey with a village clinic questionnaire and a staff questionnaire using a purposive sampling strategy. We tracked reported events using the ISSC internal database. Cost data included staff time, and the annual depreciation and opportunity costs of computers. We measured the village doctors' time costs for data collection by multiplying the number of full time employment equivalents devoted to the surveillance by the village doctors' annual salaries and benefits, which equaled their net incomes. We estimated the depreciation and opportunity costs of computers by calculating the equivalent annual computer cost and then allocating this to the surveillance based on the percentage usage. The estimated total annual cost of collecting data was 1,423 Chinese Renminbi (RMB) in 2012 (P25 = 857, P75 = 3284), including 1,250 RMB (P25 = 656, P75 = 3000) staff time costs and 134 RMB (P25 = 101, P75 = 335) depreciation and opportunity costs of computers. The total costs of collecting data from the village clinics for the syndromic surveillance system was calculated to be low compared with the individual net income in County A.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, Aladsair J.; Viswanathan, Vilayanur V.; Stephenson, David E.
A robust performance-based cost model is developed for all-vanadium, iron-vanadium and iron chromium redox flow batteries. Systems aspects such as shunt current losses, pumping losses and thermal management are accounted for. The objective function, set to minimize system cost, allows determination of stack design and operating parameters such as current density, flow rate and depth of discharge (DOD). Component costs obtained from vendors are used to calculate system costs for various time frames. A 2 kW stack data was used to estimate unit energy costs and compared with model estimates for the same size electrodes. The tool has been sharedmore » with the redox flow battery community to both validate their stack data and guide future direction.« less
[Costs of maternal-infant care in an institutionalized health care system].
Villarreal Ríos, E; Salinas Martínez, A M; Guzmán Padilla, J E; Garza Elizondo, M E; Tovar Castillo, N H; García Cornejo, M L
1998-01-01
Partial and total maternal and child health care costs were estimated. The study was developed in a Primary Care Health Clinic (PCHC) and a General Hospital (GH) of a social security health care system. Maternal and child health care services, type of activity and frequency utilization during 1995, were defined; cost examination was done separately for the PCHC and the GH. Estimation of fixed cost included departmentalization, determination of inputs, costs, basic services disbursements, and weighing. These data were related to depreciation, labor period and productivity. Estimation of variable costs required the participation of field experts; costs corresponded to those registered in billing records. The fixed cost plus the variable cost determined the unit cost, which multiplied by the of frequency of utilization generated the prenatal care, labor and delivery care, and postnatal care cost. The sum of these three equaled the maternal and child health care cost. The prenatal care cost was $1,205.33, the labor and delivery care cost was $3,313.98, and the postnatal care was $559.91. The total cost of the maternal and child health care corresponded to $5,079.22. Cost information is valuable for the health care personnel for health care planning activities.
Forecasting overhaul or replacement intervals based on estimated system failure intensity
NASA Astrophysics Data System (ADS)
Gannon, James M.
1994-12-01
System reliability can be expressed in terms of the pattern of failure events over time. Assuming a nonhomogeneous Poisson process and Weibull intensity function for complex repairable system failures, the degree of system deterioration can be approximated. Maximum likelihood estimators (MLE's) for the system Rate of Occurrence of Failure (ROCOF) function are presented. Evaluating the integral of the ROCOF over annual usage intervals yields the expected number of annual system failures. By associating a cost of failure with the expected number of failures, budget and program policy decisions can be made based on expected future maintenance costs. Monte Carlo simulation is used to estimate the range and the distribution of the net present value and internal rate of return of alternative cash flows based on the distributions of the cost inputs and confidence intervals of the MLE's.
NASA Astrophysics Data System (ADS)
Potters, M. G.; Bombois, X.; Mansoori, M.; Hof, Paul M. J. Van den
2016-08-01
Estimation of physical parameters in dynamical systems driven by linear partial differential equations is an important problem. In this paper, we introduce the least costly experiment design framework for these systems. It enables parameter estimation with an accuracy that is specified by the experimenter prior to the identification experiment, while at the same time minimising the cost of the experiment. We show how to adapt the classical framework for these systems and take into account scaling and stability issues. We also introduce a progressive subdivision algorithm that further generalises the experiment design framework in the sense that it returns the lowest cost by finding the optimal input signal, and optimal sensor and actuator locations. Our methodology is then applied to a relevant problem in heat transfer studies: estimation of conductivity and diffusivity parameters in front-face experiments. We find good correspondence between numerical and theoretical results.
Impossible Certainty: Cost Risk Analysis for Air Force Systems
2006-01-01
the estimated cost of weapon systems , which typically take many years to acquire and remain in operation for a long time . To make those esti- mates... times , uncertain, undefined, or unknown when estimates are prepared. New system development may involve further uncer- tainty due to unproven or...risk (a system requiring more money to complete than was forecasted ) and opera- tional risk (a vital capability becoming unaffordable as the program
Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stebbins, P.E.
1993-09-01
The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changesmore » in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.« less
Reusable Reentry Satellite (RRS) system design study: System cost estimates document
NASA Technical Reports Server (NTRS)
1991-01-01
The Reusable Reentry Satellite (RRS) program was initiated to provide life science investigators relatively inexpensive, frequent access to space for extended periods of time with eventual satellite recovery on earth. The RRS will provide an on-orbit laboratory for research on biological and material processes, be launched from a number of expendable launch vehicles, and operate in Low-Altitude Earth Orbit (LEO) as a free-flying unmanned laboratory. SAIC's design will provide independent atmospheric reentry and soft landing in the continental U.S., orbit for a maximum of 60 days, and will sustain three flights per year for 10 years. The Reusable Reentry Vehicle (RRV) will be 3-axis stabilized with artificial gravity up to 1.5g's, be rugged and easily maintainable, and have a modular design to accommodate a satellite bus and separate modular payloads (e.g., rodent module, general biological module, ESA microgravity botany facility, general botany module). The purpose of this System Cost Estimate Document is to provide a Life Cycle Cost Estimate (LCCE) for a NASA RRS Program using SAIC's RRS design. The estimate includes development, procurement, and 10 years of operations and support (O&S) costs for NASA's RRS program. The estimate does not include costs for other agencies which may track or interface with the RRS program (e.g., Air Force tracking agencies or individual RRS experimenters involved with special payload modules (PM's)). The life cycle cost estimate extends over the 10 year operation and support period FY99-2008.
Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection
NASA Technical Reports Server (NTRS)
Jones, Harry
2003-01-01
The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria - performance, safety, reliability, crew time, and risk - are considered, but cost is always an important factor. Because launch cost accounts for most of the cost of planetary missions, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select life support technology. The equivalent mass of a life support system includes the estimated masses of the hardware and of the pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in Advanced Life Support. A crew time mass-equivalent and sometimes other non-mass factors are added to equivalent mass to create ESM. Equivalent mass is an estimate of the launch cost only. For earth orbit rather than planetary missions, the launch cost is usually exceeded by the cost of Design, Development, Test, and Evaluation (DDT&E). Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. Since LCC includes launch cost, it is always a more accurate cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission design, destination, and duration. Since DDT&E or operations may cost more than launch, LCC may give a more accurate cost ranking than equivalent mass. To be sure of identifying the lowest cost technology for a particular mission, we should use LCC rather than equivalent mass.
NASA Technical Reports Server (NTRS)
1985-01-01
Fundamentally, the volumes of the oxidizer and fuel propellant scavenged from the orbiter and external tank determine the size and weight of the scavenging system. The optimization of system dimensions and weights is stimulated by the requirement to minimize the use of partial length of the orbiter payload bay. Thus, the cost estimates begin with weights established for the optimum design. Both the design, development, test, and evaluation and theoretical first unit hardware production costs are estimated from parametric cost weight scaling relations for four subsystems. For cryogenic propellants, the widely differing characteristics of the oxidizer and the fuel lead to two separate tank subsystems, in addition to the electrical and instrumentation subsystems. Hardwares costs also involve quantity, as an independent variable, since the number of production scavenging systems is not firm. For storable propellants, since the tankage volume of the oxidizer and fuel are equal, the hardware production costs for developing these systems are lower than for cryogenic propellants.
Nunes, Sheila Elke Araujo; Minamisava, Ruth; Vieira, Maria Aparecida da Silva; Itria, Alexander; Pessoa, Vicente Porfirio; Andrade, Ana Lúcia Sampaio Sgambatti de; Toscano, Cristiana Maria
2017-01-01
To determine and compare hospitalization costs of bacterial community-acquired pneumonia cases via different costing methods under the Brazilian Public Unified Health System perspective. Cost-of-illness study based on primary data collected from a sample of 59 children aged between 28 days and 35 months and hospitalized due to bacterial pneumonia. Direct medical and non-medical costs were considered and three costing methods employed: micro-costing based on medical record review, micro-costing based on therapeutic guidelines and gross-costing based on the Brazilian Public Unified Health System reimbursement rates. Costs estimates obtained via different methods were compared using the Friedman test. Cost estimates of inpatient cases of severe pneumonia amounted to R$ 780,70/$Int. 858.7 (medical record review), R$ 641,90/$Int. 706.90 (therapeutic guidelines) and R$ 594,80/$Int. 654.28 (Brazilian Public Unified Health System reimbursement rates). Costs estimated via micro-costing (medical record review or therapeutic guidelines) did not differ significantly (p=0.405), while estimates based on reimbursement rates were significantly lower compared to estimates based on therapeutic guidelines (p<0.001) or record review (p=0.006). Brazilian Public Unified Health System costs estimated via different costing methods differ significantly, with gross-costing yielding lower cost estimates. Given costs estimated by different micro-costing methods are similar and costing methods based on therapeutic guidelines are easier to apply and less expensive, this method may be a valuable alternative for estimation of hospitalization costs of bacterial community-acquired pneumonia in children. Determinar e comparar custos hospitalares no tratamento da pneumonia bacteriana adquirida na comunidade por diferentes metodologias de custeio, na perspectiva do Sistema Único de Saúde. Estudo de custo, com coleta de dados primários de uma amostra de 59 crianças com 28 dias a 35 meses de idade hospitalizadas por pneumonia bacteriana. Foram considerados custos diretos médicos e não médicos. Três metodologias de custeio foram utilizadas: microcusteio por revisão de prontuários, microcusteio considerando diretriz terapêutica e macrocusteio por ressarcimento do Sistema Único de Saúde. Os custos estimados pelas diferentes metodologias foram comparados utilizando o teste de Friedman. Os custos hospitalares de crianças com pneumonia grave foram R$ 780,70 ($Int. 858.7) por revisão de prontuários, R$ 641,90 ($Int. 706.90) por diretriz terapêutica e R$ 594,80 ($Int. 654.28) por ressarcimento do Sistema Único de Saúde, respectivamente. A utilização de metodologias de microcusteio (revisão de prontuários e diretriz) resultou em estimativas de custos equivalentes (p=0,405), enquanto o custo estimado por ressarcimento foi significativamente menor do que aqueles estimados por diretriz (p<0,001) e por revisão de prontuário (p=0,006), sendo, assim, significativamente diferentes. Na perspectiva do Sistema Único de Saúde, existe diferença significativa nos custos estimados quando se utilizam diferentes metodologias, sendo a estimativa por ressarcimento a que resulta em valores menores. Considerando que não há diferença nos valores de custos estimados por diferentes metodologias de microcusteio, a metodologia de custeio por diretriz, de mais fácil e rápida execução, é uma alternativa válida para estimativa de custos de hospitalização por pneumonias bacterianas em crianças.
Latest NASA Instrument Cost Model (NICM): Version VI
NASA Technical Reports Server (NTRS)
Mrozinski, Joe; Habib-Agahi, Hamid; Fox, George; Ball, Gary
2014-01-01
The NASA Instrument Cost Model, NICM, is a suite of tools which allow for probabilistic cost estimation of NASA's space-flight instruments at both the system and subsystem level. NICM also includes the ability to perform cost by analogy as well as joint confidence level (JCL) analysis. The latest version of NICM, Version VI, was released in Spring 2014. This paper will focus on the new features released with NICM VI, which include: 1) The NICM-E cost estimating relationship, which is applicable for instruments flying on Explorer-like class missions; 2) The new cluster analysis ability which, alongside the results of the parametric cost estimation for the user's instrument, also provides a visualization of the user's instrument's similarity to previously flown instruments; and 3) includes new cost estimating relationships for in-situ instruments.
NASA Technical Reports Server (NTRS)
Calle, Luz Marina; Hintze, Paul E.; Parlier, Christopher R.; Coffman, Brekke E.; Kolody, Mark R.; Curran, Jerome P.; Trejo, David; Reinschmidt, Ken; Kim, Hyung-Jin
2009-01-01
A 20-year life cycle cost analysis was performed to compare the operational life cycle cost, processing/turnaround timelines, and operations manpower inspection/repair/refurbishment requirements for corrosion protection of the Kennedy Space Center launch pad flame deflector associated with the existing cast-in-place materials and a newer advanced refractory ceramic material. The analysis compared the estimated costs of(1) continuing to use of the current refractory material without any changes; (2) completely reconstructing the flame trench using the current refractory material; and (3) completely reconstructing the flame trench with a new high-performance refractory material. Cost estimates were based on an analysis of the amount of damage that occurs after each launch and an estimate of the average repair cost. Alternative 3 was found to save $32M compared to alternative 1 and $17M compared to alternative 2 over a 20-year life cycle.
Defense Acquisitions: Addressing Incentives is Key to Further Reform Efforts
2014-04-30
championed sound management practices, such as realistic cost estimating, prototyping, and systems engineering . While some progress has been made...other reforms have championed sound management practices, such as realistic cost estimating, prototyping, and systems engineering . DOD’s declining...principles from disciplines such as systems engineering , as well as lessons learned and past reforms. The body of work we have done on benchmarking
The Pilot Training Study: A Cost-Estimating Model for Advanced Pilot Training (APT).
ERIC Educational Resources Information Center
Knollmeyer, L. E.
The Advanced Pilot Training Cost Model is a statement of relationships that may be used, given the necessary inputs, for estimating the resources required and the costs to train pilots in the Air Force formal flying training schools. Resources and costs are computed by weapon system on an annual basis for use in long-range planning or sensitivity…
Energy-Systems Economic Analysis
NASA Technical Reports Server (NTRS)
Doane, J.; Slonski, M. L.; Borden, C. S.
1982-01-01
Energy Systems Economic Analysis (ESEA) program is flexible analytical tool for rank ordering of alternative energy systems. Basic ESEA approach derives an estimate of those costs incurred as result of purchasing, installing and operating an energy system. These costs, suitably aggregated into yearly costs over lifetime of system, are divided by expected yearly energy output to determine busbar energy costs. ESEA, developed in 1979, is written in FORTRAN IV for batch execution.
Parabolic Trough Collector Cost Update for the System Advisor Model (SAM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurup, Parthiv; Turchi, Craig S.
2015-11-01
This report updates the baseline cost for parabolic trough solar fields in the United States within NREL's System Advisor Model (SAM). SAM, available at no cost at https://sam.nrel.gov/, is a performance and financial model designed to facilitate decision making for people involved in the renewable energy industry. SAM is the primary tool used by NREL and the U.S. Department of Energy (DOE) for estimating the performance and cost of concentrating solar power (CSP) technologies and projects. The study performed a bottom-up build and cost estimate for two state-of-the-art parabolic trough designs -- the SkyTrough and the Ultimate Trough. The SkyTroughmore » analysis estimated the potential installed cost for a solar field of 1500 SCAs as $170/m 2 +/- $6/m 2. The investigation found that SkyTrough installed costs were sensitive to factors such as raw aluminum alloy cost and production volume. For example, in the case of the SkyTrough, the installed cost would rise to nearly $210/m 2 if the aluminum alloy cost was $1.70/lb instead of $1.03/lb. Accordingly, one must be aware of fluctuations in the relevant commodities markets to track system cost over time. The estimated installed cost for the Ultimate Trough was only slightly higher at $178/m 2, which includes an assembly facility of $11.6 million amortized over the required production volume. Considering the size and overall cost of a 700 SCA Ultimate Trough solar field, two parallel production lines in a fully covered assembly facility, each with the specific torque box, module and mirror jigs, would be justified for a full CSP plant.« less
Project Cost Estimation for Planning
DOT National Transportation Integrated Search
2010-02-26
For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...
Costs of postabortion care in public sector health facilities in Malawi: a cross-sectional survey.
Benson, Janie; Gebreselassie, Hailemichael; Mañibo, Maribel Amor; Raisanen, Keris; Johnston, Heidi Bart; Mhango, Chisale; Levandowski, Brooke A
2015-12-17
Health systems could obtain substantial cost savings by providing safe abortion care rather than providing expensive treatment for complications of unsafely performed abortions. This study estimates current health system costs of treating unsafe abortion complications and compares these findings with newly-projected costs for providing safe abortion in Malawi. We conducted in-depth surveys of medications, supplies, and time spent by clinical personnel dedicated to postabortion care (PAC) for three treatment categories (simple, severe non-surgical, and severe surgical complications) and three uterine evacuation (UE) procedure types (manual vacuum aspiration (MVA), dilation and curettage (D&C) and misoprostol-alone) at 15 purposively-selected public health facilities. Per-case treatment costs were calculated and applied to national, annual PAC caseload data. The median cost per D&C case ($63) was 29% higher than MVA treatment ($49). Costs to treat severe non-surgical complications ($63) were almost five times higher than those of a simple PAC case ($13). Severe surgical complications were especially costly to treat at $128. PAC treatment in public facilities cost an estimated $314,000 annually. Transition to safe, legal abortion would yield an estimated cost reduction of 20%-30%. The method of UE and severity of complications have a large impact on overall costs. With a liberalized abortion law and implementation of induced abortion services with WHO-recommended UE methods, current PAC costs to the health system could markedly decrease.
Sensor selection cost optimisation for tracking structurally cyclic systems: a P-order solution
NASA Astrophysics Data System (ADS)
Doostmohammadian, M.; Zarrabi, H.; Rabiee, H. R.
2017-08-01
Measurements and sensing implementations impose certain cost in sensor networks. The sensor selection cost optimisation is the problem of minimising the sensing cost of monitoring a physical (or cyber-physical) system. Consider a given set of sensors tracking states of a dynamical system for estimation purposes. For each sensor assume different costs to measure different (realisable) states. The idea is to assign sensors to measure states such that the global cost is minimised. The number and selection of sensor measurements need to ensure the observability to track the dynamic state of the system with bounded estimation error. The main question we address is how to select the state measurements to minimise the cost while satisfying the observability conditions. Relaxing the observability condition for structurally cyclic systems, the main contribution is to propose a graph theoretic approach to solve the problem in polynomial time. Note that polynomial time algorithms are suitable for large-scale systems as their running time is upper-bounded by a polynomial expression in the size of input for the algorithm. We frame the problem as a linear sum assignment with solution complexity of ?.
Coal supply and cost under technological and environmental uncertainty
NASA Astrophysics Data System (ADS)
Chan, Melissa
This thesis estimates available coal resources, recoverability, mining costs, environmental impacts, and environmental control costs for the United States under technological and environmental uncertainty. It argues for a comprehensive, well-planned research program that will resolve resource uncertainty, and innovate new technologies to improve recovery and environmental performance. A stochastic process and cost (constant 2005) model for longwall, continuous, and surface mines based on current technology and mining practice data was constructed. It estimates production and cost ranges within 5-11 percent of 2006 prices and production rates. The model was applied to the National Coal Resource Assessment. Assuming the cheapest mining method is chosen to extract coal, 250-320 billion tons are recoverable. Two-thirds to all coal resource can be mined at a cost less than 4/mmBTU. If U.S. coal demand substantially increases, as projected by alternate Energy Information Administration (EIA), resources might not last more than 100 years. By scheduling cost to meet EIA projected demand, estimated cost uncertainty increases over time. It costs less than 15/ton to mine in the first 10 years of a 100 year time period, 10-30/ton in the following 50 years, and 15-$90/ton thereafter. Environmental impacts assessed are subsidence from underground mines, surface mine pit area, erosion, acid mine drainage, air pollutant and methane emissions. The analysis reveals that environmental impacts are significant and increasing as coal demand increases. Control technologies recommended to reduce these impacts are backfilling underground mines, surface pit reclamation, substitution of robotic underground mining systems for surface pit mining, soil replacement for erosion, placing barriers between exposed coal and the elements to avoid acid formation, and coalbed methane development to avoid methane emissions during mining. The costs to apply these technologies to meet more stringent environmental regulation scenarios are estimated. The results show that the cost of meeting these regulatory scenarios could increase mining costs two to six times the business as usual cost, which could significantly affect the cost of coal-powered electricity generation. This thesis provides a first estimate of resource availability, mining cost, and environmental impact assessment and cost analysis. Available resource is not completely reported, so the available estimate is lower than actual resource. Mining costs are optimized, so provide a low estimate of potential costs. Environmental impact estimates are on the high end of potential impact that may be incurred because it is assumed that impact is unavoidable. Control costs vary. Estimated cost to control subsidence and surface mine pit impacts are suitable estimates of the cost to reduce land impacts. Erosion control and robotic mining system costs are lower, and methane and acid mine drainage control costs are higher, than they may be in the case that these impacts must be reduced.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, Alasdair; Thomsen, Edwin; Reed, David
2016-04-20
A chemistry agnostic cost performance model is described for a nonaqueous flow battery. The model predicts flow battery performance by estimating the active reaction zone thickness at each electrode as a function of current density, state of charge, and flow rate using measured data for electrode kinetics, electrolyte conductivity, and electrode-specific surface area. Validation of the model is conducted using a 4kW stack data at various current densities and flow rates. This model is used to estimate the performance of a nonaqueous flow battery with electrode and electrolyte properties used from the literature. The optimized cost for this system ismore » estimated for various power and energy levels using component costs provided by vendors. The model allows optimization of design parameters such as electrode thickness, area, flow path design, and operating parameters such as power density, flow rate, and operating SOC range for various application duty cycles. A parametric analysis is done to identify components and electrode/electrolyte properties with the highest impact on system cost for various application durations. A pathway to 100$kWh -1 for the storage system is identified.« less
Cost-estimating for commercial digital printing
NASA Astrophysics Data System (ADS)
Keif, Malcolm G.
2007-01-01
The purpose of this study is to document current cost-estimating practices used in commercial digital printing. A research study was conducted to determine the use of cost-estimating in commercial digital printing companies. This study answers the questions: 1) What methods are currently being used to estimate digital printing? 2) What is the relationship between estimating and pricing digital printing? 3) To what extent, if at all, do digital printers use full-absorption, all-inclusive hourly rates for estimating? Three different digital printing models were identified: 1) Traditional print providers, who supplement their offset presswork with digital printing for short-run color and versioned commercial print; 2) "Low-touch" print providers, who leverage the power of the Internet to streamline business transactions with digital storefronts; 3) Marketing solutions providers, who see printing less as a discrete manufacturing process and more as a component of a complete marketing campaign. Each model approaches estimating differently. Understanding and predicting costs can be extremely beneficial. Establishing a reliable system to estimate those costs can be somewhat challenging though. Unquestionably, cost-estimating digital printing will increase in relevance in the years ahead, as margins tighten and cost knowledge becomes increasingly more critical.
Development of weight and cost estimates for lifting surfaces with active controls
NASA Technical Reports Server (NTRS)
Anderson, R. D.; Flora, C. C.; Nelson, R. M.; Raymond, E. T.; Vincent, J. H.
1976-01-01
Equations and methodology were developed for estimating the weight and cost incrementals due to active controls added to the wing and horizontal tail of a subsonic transport airplane. The methods are sufficiently generalized to be suitable for preliminary design. Supporting methodology and input specifications for the weight and cost equations are provided. The weight and cost equations are structured to be flexible in terms of the active control technology (ACT) flight control system specification. In order to present a self-contained package, methodology is also presented for generating ACT flight control system characteristics for the weight and cost equations. Use of the methodology is illustrated.
The use of the transition cost accounting system in health services research
Azoulay, Arik; Doris, Nadine M; Filion, Kristian B; Caron, Joanna; Pilote, Louise; Eisenberg, Mark J
2007-01-01
The Transition cost accounting system integrates clinical, resource utilization, and financial information and is currently being used by several hospitals in Canada and the United States to calculate the costs of patient care. Our objectives were to review the use of hospital-based cost accounting systems to measure costs of treatment and discuss potential use of the Transition cost accounting system in health services research. Such systems provide internal reports to administrators for formulating major policies and strategic plans for future activities. Our review suggests that the Transition cost accounting information system may useful for estimating in-hospital costs of treatment. PMID:17686148
The use of the transition cost accounting system in health services research.
Azoulay, Arik; Doris, Nadine M; Filion, Kristian B; Caron, Joanna; Pilote, Louise; Eisenberg, Mark J
2007-08-08
The Transition cost accounting system integrates clinical, resource utilization, and financial information and is currently being used by several hospitals in Canada and the United States to calculate the costs of patient care. Our objectives were to review the use of hospital-based cost accounting systems to measure costs of treatment and discuss potential use of the Transition cost accounting system in health services research. Such systems provide internal reports to administrators for formulating major policies and strategic plans for future activities. Our review suggests that the Transition cost accounting information system may useful for estimating in-hospital costs of treatment.
Probabilistic estimation of numbers and costs of future landslides in the San Francisco Bay region
Crovelli, R.A.; Coe, J.A.
2009-01-01
We used historical records of damaging landslides triggered by rainstorms and a newly developed Probabilistic Landslide Assessment Cost Estimation System (PLACES) to estimate the numbers and direct costs of future landslides in the 10-county San Francisco Bay region. Historical records of damaging landslides in the region are incomplete. Therefore, our estimates of numbers and costs of future landslides are minimal estimates. The estimated mean annual number of future damaging landslides for the entire 10-county region is about 65. Santa Cruz County has the highest estimated mean annual number of damaging future landslides (about 18), whereas Napa, San Francisco, and Solano Counties have the lowest estimated mean numbers of damaging landslides (about 1 each). The estimated mean annual cost of future landslides in the entire region is about US $14.80 million (year 2000 $). The estimated mean annual cost is highest for San Mateo County ($3.24 million) and lowest for Solano County ($0.18 million). The annual per capita cost for the entire region will be about $2.10. Santa Cruz County will have the highest annual per capita cost at $8.45, whereas San Francisco County will have the lowest per capita cost at $0.31. Normalising costs by dividing by the percentage of land area with slopes equal to or greater than 17% indicates that San Francisco County will have the highest cost per square km ($7,101), whereas Santa Clara County will have the lowest cost per square km ($229). These results indicate that the San Francisco Bay region has one of the highest levels of landslide risk in the United States. Compared with landslide cost estimates from the rest of the world, the risk level in the Bay region seems high, but not exceptionally high.
Bread Basket: a gaming model for estimating home-energy costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
An instructional manual for answering the twenty variables on COLORADO ENERGY's computerized program estimating home energy costs. The program will generate home-energy cost estimates based on individual household data, such as total square footage, number of windows and doors, number and variety of appliances, heating system design, etc., and will print out detailed costs, showing the percentages of the total household budget that energy costs will amount to over a twenty-year span. Using the program, homeowners and policymakers alike can predict the effects of rising energy prices on total spending by Colorado households.
Air-Mobile Ground Security and Surveillance System (AMGSSS) Project Summary Report.
1996-09-01
significantly to the cost and 5 lb or more to the weight . 15 5.3.3 Laser Ranging A Contraves laser rangefinder is recommended if the high cost is not...8 3.2 .4 B atteries ....................................................... 8 3.2.5 Payload Weight and Power...concept payload weight and power estimate ........................... 9 3. System battery estim ate
Landslide risk in the San Francisco Bay region
Coe, J.A.; Crovelli, R.A.
2008-01-01
We have used historical records of damaging landslides triggered by rainstorms, and a newly developed Probabilistic Landslide Assessment Cost Estimation System (PLACES), to estimate the numbers and direct costs of future landslides in the San Francisco Bay region. The estimated annual cost of future landslides in the entire region is about US $15 million (year 2000 $). The estimated annual cost is highest for San Mateo County ($3.32 million) and lowest for Solano County ($0.18 million). Normalizing costs by dividing by the percentage of land area with slopes equal or greater than about 10° indicates that San Francisco County will have the highest cost per square km ($7,400), whereas Santa Clara County will have the lowest cost per square km ($230). These results indicate that the San Francisco Bay region has one of the highest levels of landslide risk in the United States. Compared to landslide cost estimates from the rest of the world, the risk level in the Bay region seems high, but not exceptionally high.
Process-based Cost Estimation for Ramjet/Scramjet Engines
NASA Technical Reports Server (NTRS)
Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John
2003-01-01
Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.
A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions
NASA Technical Reports Server (NTRS)
Foreman, Veronica; Le Moigne, Jacqueline; de Weck, Oliver
2016-01-01
Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the shortcomings of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-the-art in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority weaknesses within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.
A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions
NASA Technical Reports Server (NTRS)
Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver
2016-01-01
Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.
NASA Astrophysics Data System (ADS)
Choi, Wongyu; Pate, Michael B.; Warren, Ryan D.; Nelson, Ron M.
2018-05-01
This paper presents an economic analysis of stationary and dual-axis tracking photovoltaic (PV) systems installed in the US Upper Midwest in terms of life-cycle costs, payback period, internal rate of return, and the incremental cost of solar energy. The first-year performance and energy savings were experimentally found along with documented initial cost. Future PV performance, savings, and operating and maintenance costs were estimated over 25-year assumed life. Under the given assumptions and discount rates, the life-cycle savings were found to be negative. Neither system was found to have payback periods less than the assumed system life. The lifetime average incremental costs of energy generated by the stationary and dual-axis tracking systems were estimated to be 0.31 and 0.37 per kWh generated, respectively. Economic analyses of different scenarios, each having a unique set of assumptions for costs and metering, showed a potential for economic feasibility under certain conditions when compared to alternative investments with assumed yields.
Space Station Facility government estimating
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
Flannagan, Carol A. C.; Bingham, C. Raymond; Cunningham, Rebecca M.; Rupp, Jonathan D.
2015-01-01
Objectives. We estimated the injury prevention impact and cost savings associated with alcohol interlock installation in all new US vehicles. Methods. We identified fatal and nonfatal injuries associated with drinking driver vehicle crashes from the Fatality Analysis Reporting System and National Automotive Sampling System’s General Estimates System data sets (2006–2010). We derived the estimated impact of universal interlock installation using an estimate of the proportion of alcohol-related crashes that were preventable in vehicles < 1 year-old. We repeated this analysis for each subsequent year, assuming a 15-year implementation. We applied existing crash-induced injury cost metrics to approximate economic savings, and we used a sensitivity analysis to examine results with varying device effectiveness. Results. Over 15 years, 85% of crash fatalities (> 59 000) and 84% to 88% of nonfatal injuries (> 1.25 million) attributed to drinking drivers would be prevented, saving an estimated $342 billion in injury-related costs, with the greatest injury and cost benefit realized among recently legal drinking drivers. Cost savings outweighed installation costs after 3 years, with the policy remaining cost effective provided device effectiveness remained above approximately 25%. Conclusions. Alcohol interlock installation in all new vehicles is likely a cost-effective primary prevention policy that will substantially reduce alcohol-involved crash fatalities and injuries, especially among young vulnerable drivers. PMID:25790385
Life Cycle Cost Analysis of Shuttle-Derived Launch Vehicles, Volume 1
NASA Technical Reports Server (NTRS)
1982-01-01
The design, performance, and programmatic definition of shuttle derived launch vehicles (SDLV) established by two different contractors were assessed and the relative life cycle costs of space transportation systems using the shuttle alone were compared with costs for a mix of shuttles and SDLV's. The ground rules and assumptions used in the evaluation are summarized and the work breakdown structure is included. Approaches used in deriving SDLV costs, including calibration factors and historical data are described. Both SDLV cost estimates and SDLV/STS cost comparisons are summarized. Standard formats are used to report comprehensive SDLV life cycle estimates. Hardware cost estimates (below subsystem level) obtained using the RCA PRICE 84 cost model are included along with other supporting data.
Predicting bunching costs for the Radio Horse 9 winch
Chris B. LeDoux; Bruce W. Kling; Patrice A. Harou; Patrice A. Harou
1987-01-01
Data from field studies and a prebunching cost simulator have been assembled and converted into a general equation that can be used to estimate the prebunching cost of the Radio Horse 9 winch. The methods can be used to estimate prebunching cost for bunching under the skyline corridor for swinging with cable systems, for bunching to skid trail edge to be picked up by a...
A clinical economics workstation for risk-adjusted health care cost management.
Eisenstein, E. L.; Hales, J. W.
1995-01-01
This paper describes a healthcare cost accounting system which is under development at Duke University Medical Center. Our approach differs from current practice in that this system will dynamically adjust its resource usage estimates to compensate for variations in patient risk levels. This adjustment is made possible by introducing a new cost accounting concept, Risk-Adjusted Quantity (RQ). RQ divides case-level resource usage variances into their risk-based component (resource consumption differences attributable to differences in patient risk levels) and their non-risk-based component (resource consumption differences which cannot be attributed to differences in patient risk levels). Because patient risk level is a factor in estimating resource usage, this system is able to simultaneously address the financial and quality dimensions of case cost management. In effect, cost-effectiveness analysis is incorporated into health care cost management. PMID:8563361
Benefit-Cost Analysis of Integrated Paratransit Systems : Volume 6. Technical Appendices.
DOT National Transportation Integrated Search
1979-09-01
This last volume, includes five technical appendices which document the methodologies used in the benefit-cost analysis. They are the following: Scenario analysis methodology; Impact estimation; Example of impact estimation; Sensitivity analysis; Agg...
Estimation of the cost of large-scale school deworming programmes with benzimidazoles
Montresor, A.; Gabrielli, A.F.; Engels, D.
2017-01-01
Summary This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20 000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33 000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19 000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. PMID:19926104
[Public free anonymous HIV testing centers: cost analysis and financing options].
Dozol, Adrien; Tribout, Martin; Labalette, Céline; Moreau, Anne-Christine; Duteil, Christelle; Bertrand, Dominique; Segouin, Christophe
2011-01-01
The services of general interest provided by hospitals, such as free HIV clinics, have been funded since 2005 by a lump sum covering all costs. The allocation of the budget was initially determined based on historical and declarative data. However, the French Ministry of Health (MoH) recently outlined new rules for determining the allocation of financial resources and contracting hospitals for each type of services of general interest provided. The aim of this study was to estimate the annual cost of a public free anonymous HIV-testing center and to assess the budgetary implications of new financing systems. Three financing options were compared: the historic block grant; a mixed system recommended by the MoH associating a lump sum covering the recurring costs of an average center and a variable part based on the type and volume of services provided; and a fee-for-services system. For the purposes of this retrospective study, the costs and activity data of the HIV testing clinic of a public hospital located in the North of Paris were obtained for 2007. The costs were analyzed from the perspective of the hospital. The total cost was estimated at 555,698 euros. Personnel costs accounted for 31% of the total costs, while laboratory expenses accounted for 36% of the total costs. While the estimated deficit was 292,553 euros under the historic system, the financial balance of the clinic was found to be positive under a fee-for-services system. The budget allocated to the HIV clinic under the system recommended by the MoH covers most of the current expenses of the HIV clinic while meeting the requirements of free confidential care.
Global Positioning System III (GPS III)
2015-12-01
Vacuum (TVAC) testing on October 12, 2015, and successfully completed baseline TVAC testing on December 23, 2015 – a major system- level event...0.0 0.0 Total 4142.9 5285.2 N/A 5180.4 4269.8 5650.1 5557.4 Current APB Cost Estimate Reference SCP dated July 02, 2015 Confidence Level Confidence... Level of cost estimate for current APB: 60% The current APB is established at the 60% confidence level . This estimate is built upon the February 2015
NASA Technical Reports Server (NTRS)
Devito, D. M.
1981-01-01
A low-cost GPS civil-user mobile terminal whose purchase cost is substantially an order of magnitude less than estimates for the military counterpart is considered with focus on ground station requirements for position monitoring of civil users requiring this capability and the civil user navigation and location-monitoring requirements. Existing survey literature was examined to ascertain the potential users of a low-cost NAVSTAR receiver and to estimate their number, function, and accuracy requirements. System concepts are defined for low cost user equipments for in-situ navigation and the retransmission of low data rate positioning data via a geostationary satellite to a central computing facility.
The economic feasibility of producing sweet sorghum as an ethanol feedstock in Mississippi
NASA Astrophysics Data System (ADS)
Linton, Joseph Andrew
This study examines the feasibility of producing sweet sorghum as an ethanol feedstock in Mississippi. An enterprise budgeting system is used along with estimates of transportation costs to estimate farmers' breakeven costs for producing and delivering sweet sorghum biomass. This breakeven cost for the farmer, along with breakeven costs for the producer based on wholesale ethanol price, production costs, and transportation and marketing costs for the refined ethanol, is used to estimate the amounts that farmers and ethanol producers would be willing to accept (WTA) and willing to pay (WTP), respectively, for sweet sorghum biomass. These WTA and WTP estimates are analyzed by varying key factors in the biomass and ethanol production processes. Deterministic and stochastic models are used to estimate profits for sweet sorghum and competing crops in two representative counties in Mississippi, with sweet sorghum consistently yielding negative per-acre profits in both counties.
Crovelli, Robert A.; Coe, Jeffrey A.
2008-01-01
The Probabilistic Landslide Assessment Cost Estimation System (PLACES) presented in this report estimates the number and economic loss (cost) of landslides during a specified future time in individual areas, and then calculates the sum of those estimates. The analytic probabilistic methodology is based upon conditional probability theory and laws of expectation and variance. The probabilistic methodology is expressed in the form of a Microsoft Excel computer spreadsheet program. Using historical records, the PLACES spreadsheet is used to estimate the number of future damaging landslides and total damage, as economic loss, from future landslides caused by rainstorms in 10 counties of the San Francisco Bay region in California. Estimates are made for any future 5-year period of time. The estimated total number of future damaging landslides for the entire 10-county region during any future 5-year period of time is about 330. Santa Cruz County has the highest estimated number of damaging landslides (about 90), whereas Napa, San Francisco, and Solano Counties have the lowest estimated number of damaging landslides (5?6 each). Estimated direct costs from future damaging landslides for the entire 10-county region for any future 5-year period are about US $76 million (year 2000 dollars). San Mateo County has the highest estimated costs ($16.62 million), and Solano County has the lowest estimated costs (about $0.90 million). Estimated direct costs are also subdivided into public and private costs.
Study of alternate space shuttle concepts
NASA Technical Reports Server (NTRS)
1971-01-01
A study of alternate space shuttle concepts was conducted to examine the stage-and-one-half concept and its potential for later conversion and use in the two stage reusable shuttle system. A study of external hydrogen tank concepts was conducted to determine the issues involved in the design and production of a low-cost expendable tank system. The major objectives of the study were to determine: (1) realistic drop tank program cost estimates, (2) estimated drop tank program cost for selected specific designs, and (3) change in program cost due to variations in design and manufacturing concepts and changes in program assumptions.
Understanding cost growth during operations of planetary missions: An explanation of changes
NASA Astrophysics Data System (ADS)
McNeill, J. F.; Chapman, E. L.; Sklar, M. E.
In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed picture is constructed of why cost grew during the operations phase, even to the level of specific events in the life of the missions. As a next step, the Phase E EoC results were gleaned and synthesized to produce leading indicators, i.e., what may be identifiable signs of cost and staffing growth that may be present as early as PDR or CDR. Both a qualitative and quantitative approach was used to determine leading indicators. These leading indicators will be reviewed and a practical method for their use will be discussed.
NASA Software Cost Estimation Model: An Analogy Based Estimation Model
NASA Technical Reports Server (NTRS)
Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James
2015-01-01
The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K- nearest neighbor prediction model performance on the same data set.
Sari, Nazmi; Rotter, Thomas; Goodridge, Donna; Harrison, Liz; Kinsman, Leigh
2017-08-03
The costs of investing in health care reform initiatives to improve quality and safety have been underreported and are often underestimated. This paper reports direct and indirect cost estimates for the initial phase of the province-wide implementation of Lean activities in Saskatchewan, Canada. In order to obtain detailed information about each type of Lean event, as well as the total number of corresponding Lean events, we used the Provincial Kaizen Promotion Office (PKPO) Kaizen database. While the indirect cost of Lean implementation has been estimated using the corresponding wage rate for the event participants, the direct cost has been estimated using the fees paid to the consultant and other relevant expenses. The total cost for implementation of Lean over two years (2012-2014), including consultants and new hires, ranged from $44 million CAD to $49.6 million CAD, depending upon the assumptions used. Consultant costs accounted for close to 50% of the total. The estimated cost of Lean events alone ranged from $16 million CAD to $19.5 million CAD, with Rapid Process Improvement Workshops requiring the highest input of resources. Recognizing the substantial financial and human investments required to undertake reforms designed to improve quality and contain cost, policy makers must carefully consider whether and how these efforts result in the desired transformations. Evaluation of the outcomes of these investments must be part of the accountability framework, even prior to implementation.
Lee, Sang Cheol; Hong, Sung Kyung
2016-12-11
This paper presents an algorithm for velocity-aided attitude estimation for helicopter aircraft using a microelectromechanical system inertial-measurement unit. In general, high- performance gyroscopes are used for estimating the attitude of a helicopter, but this type of sensor is very expensive. When designing a cost-effective attitude system, attitude can be estimated by fusing a low cost accelerometer and a gyro, but the disadvantage of this method is its relatively low accuracy. The accelerometer output includes a component that occurs primarily as the aircraft turns, as well as the gravitational acceleration. When estimating attitude, the accelerometer measurement terms other than gravitational ones can be considered as disturbances. Therefore, errors increase in accordance with the flight dynamics. The proposed algorithm is designed for using velocity as an aid for high accuracy at low cost. It effectively eliminates the disturbances of accelerometer measurements using the airspeed. The algorithm was verified using helicopter experimental data. The algorithm performance was confirmed through a comparison with an attitude estimate obtained from an attitude heading reference system based on a high accuracy optic gyro, which was employed as core attitude equipment in the helicopter.
Lee, Sang Cheol; Hong, Sung Kyung
2016-01-01
This paper presents an algorithm for velocity-aided attitude estimation for helicopter aircraft using a microelectromechanical system inertial-measurement unit. In general, high- performance gyroscopes are used for estimating the attitude of a helicopter, but this type of sensor is very expensive. When designing a cost-effective attitude system, attitude can be estimated by fusing a low cost accelerometer and a gyro, but the disadvantage of this method is its relatively low accuracy. The accelerometer output includes a component that occurs primarily as the aircraft turns, as well as the gravitational acceleration. When estimating attitude, the accelerometer measurement terms other than gravitational ones can be considered as disturbances. Therefore, errors increase in accordance with the flight dynamics. The proposed algorithm is designed for using velocity as an aid for high accuracy at low cost. It effectively eliminates the disturbances of accelerometer measurements using the airspeed. The algorithm was verified using helicopter experimental data. The algorithm performance was confirmed through a comparison with an attitude estimate obtained from an attitude heading reference system based on a high accuracy optic gyro, which was employed as core attitude equipment in the helicopter. PMID:27973429
1984-05-23
Because the cost accounting reports provide the historical cost information for the cost estimating reports, we also tested the reasonableness of... accounting and cost estimating reports must be based on timely and accurate infor- mation. The reports, therefore, require the continual attention of... accounting system reported less than half the value of site direct charges (labor, materials, equipment usage, and other costs ) that should have been
Improving the Discipline of Cost Estimation and Analysis
NASA Technical Reports Server (NTRS)
Piland, William M.; Pine, David J.; Wilson, Delano M.
2000-01-01
The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning man), program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility.
Costs of Alcohol-Involved Crashes, United States, 2010
Zaloshnja, Eduard; Miller, Ted R.; Blincoe, Lawrence J.
2013-01-01
This paper estimates total and unit costs of alcohol-involved crashes in the U.S. in 2010. With methods from earlier studies, we estimated costs per crash survivor by MAIS, body part, and fracture/dislocation involvement. We multiplied them times 2010 crash incidence estimates from NHTSA data sets, with adjustments for underreporting of crashes and their alcohol involvement. The unit costs are lifetime costs discounted at 3%. To develop medical costs, we combined 2008 Health Care Utilization Program national data for hospitalizations and ED visits of crash survivors with prior estimates of post-discharge costs. Productivity losses drew on Current Population Survey and American Time Use Survey data. Quality of life losses came from a 2011 AAAM paper and property damage from insurance data. We built a hybrid incidence file comprised of 2008–2010 and 1984–86 NHTSA crash surveillance data, weighted with 2010 General Estimates System weights. Fatality data came from the 2010 FARS. An estimated 12% of 2010 crashes but only 0.9% of miles driven were alcohol-involved (BAC > .05). Alcohol-involved crashes cost an estimated $125 billion. That is 22.5% of the societal cost of all crashes. Alcohol-attributable crashes accounted for an estimated 22.5% of US auto liability insurance payments. Alcohol-involved crashes cost $0.86 per drink. Above the US BAC limit of .08, crash costs were $8.37 per mile driven; 1 in 788 trips resulted in a crash and 1 in 1,016 trips in an arrest. Unit costs for crash survivors by severity are higher for impaired driving than for other crashes. That suggests national aggregate impaired driving cost estimates in other countries are substantial underestimates if they are based on all-crash unit costs. PMID:24406941
An expert system for estimating production rates and costs for hardwood group-selection harvests
Chris B. LeDoux; B. Gopalakrishnan; R. S. Pabba
2003-01-01
As forest managers shift their focus from stands to entire ecosystems alternative harvesting methods such as group selection are being used increasingly. Results of several field time and motion studies and simulation runs were incorporated into an expert system for estimating production rates and costs associated with harvests of group-selection units of various size...
NASA Technical Reports Server (NTRS)
Sundaram, Meenakshi
2005-01-01
NASA and the aerospace industry are extremely serious about reducing the cost and improving the performance of launch vehicles both manned or unmanned. In the aerospace industry, sharing infrastructure for manufacturing more than one type spacecraft is becoming a trend to achieve economy of scale. An example is the Boeing Decatur facility where both Delta II and Delta IV launch vehicles are made. The author is not sure how Boeing estimates the costs of each spacecraft made in the same facility. Regardless of how a contractor estimates the cost, NASA in its popular cost estimating tool, NASA Air force Cost Modeling (NAFCOM) has to have a method built in to account for the effect of infrastructure sharing. Since there is no provision in the most recent version of NAFCOM2002 to take care of this, it has been found by the Engineering Cost Community at MSFC that the tool overestimates the manufacturing cost by as much as 30%. Therefore, the objective of this study is to develop a methodology to assess the impact of infrastructure sharing so that better operations cost estimates may be made.
Ohsfeldt, Robert L.; Ward, Marcia M.; Schneider, John E.; Jaana, Mirou; Miller, Thomas R.; Lei, Yang; Wakefield, Douglas S.
2005-01-01
Objective The aim of this study was to estimate the costs of implementing computerized physician order entry (CPOE) systems in hospitals in a rural state and to evaluate the financial implications of statewide CPOE implementation. Methods A simulation model was constructed using estimates of initial and ongoing CPOE costs mapped onto all general hospitals in Iowa by bed quantity and current clinical information system (CIS) status. CPOE cost estimates were obtained from a leading CPOE vendor. Current CIS status was determined through mail survey of Iowa hospitals. Patient care revenue and operating cost data published by the Iowa Hospital Association were used to simulate the financial impact of CPOE adoption on hospitals. Results CPOE implementation would dramatically increase operating costs for rural and critical access hospitals in the absence of substantial costs savings associated with improved efficiency or improved patient safety. For urban and rural referral hospitals, the cost impact is less dramatic but still substantial. However, relatively modest benefits in the form of patient care cost savings or revenue enhancement would be sufficient to offset CPOE costs for these larger hospitals. Conclusion Implementation of CPOE in rural or critical access hospitals may depend on net increase in operating costs. Adoption of CPOE may be financially infeasible for these small hospitals in the absence of increases in hospital payments or ongoing subsidies from third parties. PMID:15492033
Graham, John D; Chang, Joice
2015-02-01
The use of table saws in the United States is associated with approximately 28,000 emergency department (ED) visits and 2,000 cases of finger amputation per year. This article provides a quantitative estimate of the economic benefits of automatic protection systems that could be designed into new table saw products. Benefits are defined as reduced health-care costs, enhanced production at work, and diminished pain and suffering. The present value of the benefits of automatic protection over the life of the table saw are interpreted as the switch-point cost value, the maximum investment in automatic protection that can be justified by benefit-cost comparison. Using two alternative methods for monetizing pain and suffering, the study finds switch-point cost values of $753 and $561 per saw. These point estimates are sensitive to the values of inputs, especially the average cost of injury. The various switch-point cost values are substantially higher than rough estimates of the incremental cost of automatic protection systems. Uncertainties and future research needs are discussed. © 2014 Society for Risk Analysis.
NASA Technical Reports Server (NTRS)
Zapata, Edgar
2012-01-01
This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... estimated cost of the case exceeds the adjusted outlier threshold. We calculate the adjusted outlier... to 80 percent of the difference between the estimated cost of the case and the outlier threshold. In... Federal Prospective Payment Rates VI. Update to Payments for High-Cost Outliers under the IRF PPS A...
Competition in Weapon Systems Acquisition: Cost Analyses of Some Issues
1990-09-01
10% increments , also known as the step-ladder bids) submitted by the contractor in the first year of dual source procurement. The triangles represent...savings by subtracting annual incremental government costs, stated in constant dollars, from (3). (5) Estimate nonrecurring start-up costs, stated in...constant dollars, by fiscal year. (6) Estimate incremental logistic support costs, stated in constant dollars. by fiscal year. (7) Calculate a net
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 434.001 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF... total acquisition costs (for information technology, life cycle costs) are estimated to be $50 million... Technology Systems Executive. ...
Algae biodiesel - a feasibility report
2012-01-01
Background Algae biofuels have been studied numerous times including the Aquatic Species program in 1978 in the U.S., smaller laboratory research projects and private programs. Results Using Molina Grima 2003 and Department of Energy figures, captial costs and operating costs of the closed systems and open systems were estimated. Cost per gallon of conservative estimates yielded $1,292.05 and $114.94 for closed and open ponds respectively. Contingency scenarios were generated in which cost per gallon of closed system biofuels would reach $17.54 under the generous conditions of 60% yield, 50% reduction in the capital costs and 50% hexane recovery. Price per gallon of open system produced fuel could reach $1.94 under generous assumptions of 30% yield and $0.2/kg CO2. Conclusions Current subsidies could allow biodiesel to be produced economically under the generous conditions specified by the model. PMID:22540986
Rebuilding health systems in post-conflict countries: estimating the costs of basic services.
Newbrander, William; Yoder, Richard; Debevoise, Anne Bilby
2007-01-01
After the fall of the Taliban in 2001, the Afghan transitional government and international donors found the health system near collapse. Afghanistan had some of the worst health indicators ever recorded. To begin activities that would quickly improve the health situation, the Ministry of Health (MOH) needed both a national package of health services and reliable data on the costs of providing those services. This study details the process of determining national health priorities, creating a basic package of services, and estimating per capita and unit costs for providing those services, with an emphasis on the costing exercise. Strategies for obtaining a rapid yet reasonably accurate estimate of health service costs nationwide are discussed. In 2002 this costing exercise indicated that the basic package of services could be provided for US dollars 4.55 per person. In 2006, the findings were validated: the four major donors who contracted with non-governmental organizations (NGOs) to provide basic health services for nearly 80% of the population found per capita costs ranging from dollars 4.30 to dollars 5.12. This study is relevant for other post-conflict countries that are re-establishing health services and seeking to develop cost-effective and equitable health systems. Copyright (c) 2007 John Wiley & Sons, Ltd.
[Cost at the first level of care].
Villarreal-Ríos, E; Montalvo-Almaguer, G; Salinas-Martínez, M; Guzmán-Padilla, J E; Tovar-Castillo, N H; Garza-Elizondo, M E
1996-01-01
To estimate the unit cost of 15 causes of demand for primary care per health clinic in an institutional (social security) health care system, and to determine the average cost at the state level. The cost of 80% of clinic visits was estimated in 35 of 40 clinics in the social security health care system in the state of Nuevo Leon, Mexico. The methodology for fixed costs consisted of: departmentalization, inputs, cost, weights and construction of matrices. Variable costs were estimated for standard patients by type of health care sought and with the consensus of experts; the sum of fixed and variable costs gave the unit cost. A computerized model was employed for data processing. A large variation in unit cost was observed between health clinics studied for all causes of demand, in both metropolitan and non-metropolitan areas. Prenatal care ($92.26) and diarrhea ($93.76) were the least expensive while diabetes ($240.42) and hypertension ($312.54) were the most expensive. Non-metropolitan costs were higher than metropolitan costs (p < 0.05); controlling for number of physician's offices showed that this was determined by medical units with only one physician's office. Knowledge of unit costs is a tool that, when used by medical administrators, allows adequate health care planning and efficient allocation of health resources.
2003 IDA Cost Research Symposium: Cost of Evolutionary Acquisition/Spiral Development
2003-08-01
Louis, Missouri”, IDA Paper P-3548 “Econometric Modeling of Acquisition Category I Systems at the Lockheed- Martin Plant in Marietta , Georgia”, IDA...Systems Command (NAVSEA)..................................................... B- 71 Naval Surface Warfare Center, Dahlgren Division (NSWCDD...cost estimates and reports on life-cycle costs of major defense acquisition programs (MDAPs) in Acquisition Category ID (see Reference [1]). Cost
On the Estimation of the Cost-Effectiveness Threshold: Why, What, How?
Vallejo-Torres, Laura; García-Lorenzo, Borja; Castilla, Iván; Valcárcel-Nazco, Cristina; García-Pérez, Lidia; Linertová, Renata; Polentinos-Castro, Elena; Serrano-Aguilar, Pedro
2016-01-01
Many health care systems claim to incorporate the cost-effectiveness criterion in their investment decisions. Information on the system's willingness to pay per effectiveness unit, normally measured as quality-adjusted life-years (QALYs), however, is not available in most countries. This is partly because of the controversy that remains around the use of a cost-effectiveness threshold, about what the threshold ought to represent, and about the appropriate methodology to arrive at a threshold value. The aim of this article was to identify and critically appraise the conceptual perspectives and methodologies used to date to estimate the cost-effectiveness threshold. We provided an in-depth discussion of different conceptual views and undertook a systematic review of empirical analyses. Identified studies were categorized into the two main conceptual perspectives that argue that the threshold should reflect 1) the value that society places on a QALY and 2) the opportunity cost of investment to the system given budget constraints. These studies showed different underpinning assumptions, strengths, and limitations, which are highlighted and discussed. Furthermore, this review allowed us to compare the cost-effectiveness threshold estimates derived from different types of studies. We found that thresholds based on society's valuation of a QALY are generally larger than thresholds resulting from estimating the opportunity cost to the health care system. This implies that some interventions with positive social net benefits, as informed by individuals' preferences, might not be an appropriate use of resources under fixed budget constraints. Copyright © 2016 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.
Gordon, Louisa G; Rowell, David
2015-03-01
The objective of this study was to review the literature for malignant melanoma, basal and squamous cell carcinomas to understand: (a) national estimates of the direct health system costs of skin cancer and (b) the cost-effectiveness of interventions for skin cancer prevention or early detection. A systematic review was performed using Medline, Cochrane Library and the National Health Service Economic Evaluation Databases as well as a manual search of reference lists to identify relevant studies up to 31 August 2013. A narrative synthesis approach was used to summarize the data. National cost estimates were adjusted for country-specific inflation and presented in 2013 euros. The CHEERS statement was used to assess the quality of the economic evaluation studies. Sixteen studies reporting national estimates of skin cancer costs and 11 cost-effectiveness studies on skin cancer prevention or early detection were identified. Relative to the size of their respective populations, the annual direct health system costs for skin cancer were highest for Australia, New Zealand, Sweden and Denmark (2013 euros). Skin cancer prevention initiatives are highly cost-effective and may also be cost-saving. Melanoma early detection programmes aimed at high-risk individuals may also be cost-effective; however, updated analyses are needed. There is a significant cost burden of skin cancer for many countries and health expenditure for this disease will grow as incidence increases. Public investment in skin cancer prevention and early detection programmes show strong potential for health and economic benefits.
Investigating DRG cost weights for hospitals in middle income countries.
Ghaffari, Shahram; Doran, Christopher; Wilson, Andrew; Aisbett, Chris; Jackson, Terri
2009-01-01
Identifying the cost of hospital outputs, particularly acute inpatients measured by Diagnosis Related Groups (DRGs), is an important component of casemix implementation. Measuring the relative costliness of specific DRGs is useful for a wide range of policy and planning applications. Estimating the relative use of resources per DRG can be done through different costing approaches depending on availability of information and time and budget. This study aims to guide costing efforts in Iran and other countries in the region that are pursuing casemix funding, through identifying the main issues facing cost finding approaches and introducing the costing models compatible with their hospitals accounting and management structures. The results show that inadequate financial and utilisation information at the patient's level, poorly computerized 'feeder systems'; and low quality data make it impossible to estimate reliable DRGs costs through clinical costing. A cost modelling approach estimates the average cost of 2.723 million Rials (Iranian Currency) per DRG. Using standard linear regression, a coefficient of 0.14 (CI = 0.12-0.16) suggests that the average cost weight increases by 14% for every one-day increase in average length of stay (LOS).We concluded that calculation of DRG cost weights (CWs) using Australian service weights provides a sensible starting place for DRG-based hospital management; but restructuring hospital accounting systems, designing computerized feeder systems, using appropriate software, and development of national service weights that reflect local practice patterns will enhance the accuracy of DRG CWs.
NASA Astrophysics Data System (ADS)
Orans, Ren
1990-10-01
Existing procedures used to develop marginal costs for electric utilities were not designed for applications in an increasingly competitive market for electric power. The utility's value of receiving power, or the costs of selling power, however, depend on the exact location of the buyer or seller, the magnitude of the power and the period of time over which the power is used. Yet no electric utility in the United States has disaggregate marginal costs that reflect differences in costs due to the time, size or location of the load associated with their power or energy transactions. The existing marginal costing methods used by electric utilities were developed in response to the Public Utilities Regulatory Policy Act (PURPA) in 1978. The "ratemaking standards" (Title 1) established by PURPA were primarily concerned with the appropriate segmentation of total revenues to various classes-of-service, designing time-of-use rating periods, and the promotion of efficient long-term resource planning. By design, the methods were very simple and inexpensive to implement. Now, more than a decade later, the costing issues facing electric utilities are becoming increasingly complex, and the benefits of developing more specific marginal costs will outweigh the costs of developing this information in many cases. This research develops a framework for estimating total marginal costs that vary by the size, timing, and the location of changes in loads within an electric distribution system. To complement the existing work at the Electric Power Research Institute (EPRI) and Pacific Gas and Electric Company (PGandE) on estimating disaggregate generation and transmission capacity costs, this dissertation focuses on the estimation of distribution capacity costs. While the costing procedure is suitable for the estimation of total (generation, transmission and distribution) marginal costs, the empirical work focuses on the geographic disaggregation of marginal costs related to electric utility distribution investment. The study makes use of data from an actual distribution planning area, located within PGandE's service territory, to demonstrate the important characteristics of this new costing approach. The most significant result of this empirical work is that geographic differences in the cost of capacity in distribution systems can be as much as four times larger than the current system average utility estimates. Furthermore, lumpy capital investment patterns can lead to significant cost differences over time.
DOT National Transportation Integrated Search
2000-06-01
The Highway Economic Requirements System (HERS) computer model estimates investment requirements for the nation's highways by adding together the costs of highway improvements that the model's benefit-cost analyses indicate are warranted. In making i...
Mvundura, Mercy; Lorenson, Kristina; Chweya, Amos; Kigadye, Rosemary; Bartholomew, Kathryn; Makame, Mohammed; Lennon, T Patrick; Mwangi, Steven; Kirika, Lydia; Kamau, Peter; Otieno, Abner; Murunga, Peninah; Omurwa, Tom; Dafrossa, Lyimo; Kristensen, Debra
2015-05-28
Having data on the costs of the immunization system can provide decision-makers with information to benchmark the costs when evaluating the impact of new technologies or programmatic innovations. This paper estimated the supply chain and immunization service delivery costs and cost per dose in selected districts in Kenya and Tanzania. We also present operational data describing the supply chain and service delivery points (SDPs). To estimate the supply chain costs, we collected resource-use data for the cold chain, distribution system, and health worker time and per diems paid. We also estimated the service delivery costs, which included the time cost of health workers to provide immunization services, and per diems and transport costs for outreach sessions. Data on the annual quantities of vaccines distributed to each facility, and the occurrence and duration of stockouts were collected from stock registers. These data were collected from the national store, 2 regional and 4 district stores, and 12 SDPs in each country for 2012. Cost per dose for the supply chain and immunization service delivery were estimated. The average annual costs per dose at the SDPs were $0.34 (standard deviation (s.d.) $0.18) for Kenya when including only the vaccine supply chain costs, and $1.33 (s.d. $0.82) when including immunization service delivery costs. In Tanzania, these costs were $0.67 (s.d. $0.35) and $2.82 (s.d. $1.64), respectively. Both countries experienced vaccine stockouts in 2012, bacillus Calmette-Guérin vaccine being more likely to be stocked out in Kenya, and oral poliovirus vaccine in Tanzania. When stockouts happened, they usually lasted for at least one month. Tanzania made investments in 2011 in preparation for planned vaccine introductions, and their supply chain cost per dose is expected to decline with the new vaccine introductions. Immunization service delivery costs are a significant portion of the total costs at the SDPs. Copyright © 2015 Elsevier Ltd. All rights reserved.
Software cost/resource modeling: Deep space network software cost estimation model
NASA Technical Reports Server (NTRS)
Tausworthe, R. J.
1980-01-01
A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.
Global cost of child survival: estimates from country-level validation
van Ekdom, Liselore; Scherpbier, Robert W; Niessen, Louis W
2011-01-01
Abstract Objective To cross-validate the global cost of scaling up child survival interventions to achieve the fourth Millennium Development Goal (MDG4) as estimated by the World Health Organization (WHO) in 2007 by using the latest country-provided data and new assumptions. Methods After the main cost categories for each country were identified, validation questionnaires were sent to 32 countries with high child mortality. Publicly available estimates for disease incidence, intervention coverage, prices and resources for individual-level and programme-level activities were validated against local data. Nine updates to the 2007 WHO model were generated using revised assumptions. Finally, estimates were extrapolated to 75 countries and combined with cost estimates for immunization and malaria programmes and for programmes for the prevention of mother-to-child transmission of the human immunodeficiency virus (HIV). Findings Twenty-six countries responded. Adjustments were largest for system- and programme-level data and smallest for patient data. Country-level validation caused a 53% increase in original cost estimates (i.e. 9 billion 2004 United States dollars [US$]) for 26 countries owing to revised system and programme assumptions, especially surrounding community health worker costs. The additional effect of updated population figures was small; updated epidemiologic figures increased costs by US$ 4 billion (+15%). New unit prices in the 26 countries that provided data increased estimates by US$ 4.3 billion (+16%). Extrapolation to 75 countries increased the original price estimate by US$ 33 billion (+80%) for 2010–2015. Conclusion Country-level validation had a significant effect on the cost estimate. Price adaptations and programme-related assumptions contributed substantially. An additional 74 billion US$ 2005 (representing a 12% increase in total health expenditure) would be needed between 2010 and 2015. Given resource constraints, countries will need to prioritize health activities within their national resource envelope. PMID:21479091
The socioeconomic costs of mental illness in Spain.
Oliva-Moreno, Juan; López-Bastida, Julio; Montejo-González, Angel Luis; Osuna-Guerrero, Rubén; Duque-González, Beatriz
2009-10-01
Mental illness affects a large number of people in the world, seriously impairing their quality of life and resulting in high socioeconomic costs for health care systems and society. Our aim is to estimate the socioeconomic impact of mental illness in Spain for the year 2002, including health care resources, informal care and loss of labour productivity. A prevalence-based approach was used to estimate direct medical costs, direct non-medical costs, and loss of labour productivity. The total costs of mental illness have been estimated at 7,019 million euros. Direct medical costs represented 39.6% of the total costs and 7.3% of total public healthcare expenditure in Spain. Informal care costs represented 17.7% of the total costs. Loss of labour productivity accounted for 42.7% of total costs. In conclusion, the costs of mental illness in Spain make a considerable economic impact from a societal perspective.
The health system cost of post-abortion care in Uganda
Vlassoff, Michael; Mugisha, Frederick; Sundaram, Aparna; Bankole, Akinrinola; Singh, Susheela; Amanya, Leo; Kiggundu, Charles; Mirembe, Florence
2014-01-01
This article presents estimates based on the research conducted in 2010 of the cost to the Ugandan health system of providing post-abortion care (PAC), filling a gap in knowledge of the cost of unsafe abortion. Thirty-nine public and private health facilities were sampled representing three levels of health care, and data were collected on drugs, supplies, material, personnel time and out-of-pocket expenses. In addition, direct non-medical costs in the form of overhead and capital costs were also measured. Our results show that the average annual PAC cost per client, across five types of abortion complications, was $131. The total cost of PAC nationally, including direct non-medical costs, was estimated to be $13.9 million per year. Satisfying all demand for PAC would raise the national cost to $20.8 million per year. This shows that PAC consumes a substantial portion of the total expenditure in reproductive health in Uganda. Investing more resources in family planning programmes to prevent unwanted and mistimed pregnancies would help reduce health systems costs. PMID:23274438
Deep space network software cost estimation model
NASA Technical Reports Server (NTRS)
Tausworthe, R. C.
1981-01-01
A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.
A comparative cost analysis of robot-assisted versus traditional laparoscopic partial nephrectomy.
Hyams, Elias; Pierorazio, Philip; Mullins, Jeffrey K; Ward, Maryann; Allaf, Mohamad
2012-07-01
Robot-assisted laparoscopic partial nephrectomy (RALPN) is supplanting traditional laparoscopic partial nephrectomy (LPN) as the technique of choice for minimally invasive nephron-sparing surgery. This evolution has resulted from potential clinical benefits, as well as proliferation of robotic systems and patient demand for robot-assisted surgery. We sought to quantify the costs associated with the use of robotics for minimally invasive partial nephrectomy. A cost analysis was performed for 20 consecutive robot-assisted partial nephrectomy (RPN) and LPN patients at our institution from 2009 to 2010. Data included actual perioperative and hospitalization costs as well as professional fees. Capital costs were estimated using purchase costs and amortization of two robotic systems from 2001 to 2009, as well as maintenance contract costs. The estimated cost/case was obtained using total robotic surgical volume during this period. Total estimated costs were compared between groups. A separate analysis was performed assuming "ideal" robotic utilization during a comparable period. RALPN had a cost premium of +$1066/case compared with LPN, assuming actual robot utilization from 2001 to 2009. Assuming "ideal" utilization during a comparable period, this premium decreased to +$334; capital costs per case decreased from $1907 to $1175. Tumor size, operative time, and length of stay were comparable between groups. RALPN is associated with a small to moderate cost premium depending on assumptions regarding robotic surgical volume. Saturated utilization of robotic systems decreases attributable capital costs and makes comparison with laparoscopy more favorable. Purported clinical benefits of RPN (eg, decreased warm ischemia time, increased utilization of nephron-sparing surgery) need further study, because these may have cost implications.
The cost of implementing inpatient bar code medication administration.
Sakowski, Julie Ann; Ketchel, Alan
2013-02-01
To calculate the costs associated with implementing and operating an inpatient bar-code medication administration (BCMA) system in the community hospital setting and to estimate the cost per harmful error prevented. This is a retrospective, observational study. Costs were calculated from the hospital perspective and a cost-consequence analysis was performed to estimate the cost per preventable adverse drug event averted. Costs were collected from financial records and key informant interviews at 4 not-for profit community hospitals. Costs included direct expenditures on capital, infrastructure, additional personnel, and the opportunity costs of time for existing personnel working on the project. The number of adverse drug events prevented using BCMA was estimated by multiplying the number of doses administered using BCMA by the rate of harmful errors prevented by interventions in response to system warnings. Our previous work found that BCMA identified and intercepted medication errors in 1.1% of doses administered, 9% of which potentially could have resulted in lasting harm. The cost of implementing and operating BCMA including electronic pharmacy management and drug repackaging over 5 years is $40,000 (range: $35,600 to $54,600) per BCMA-enabled bed and $2000 (range: $1800 to $2600) per harmful error prevented. BCMA can be an effective and potentially cost-saving tool for preventing the harm and costs associated with medication errors.
Mutowo, Mutsa P.; Lorgelly, Paula K.; Laxy, Michael; Mangwiro, John C.; Owen, Alice J.
2016-01-01
Objective. Treating complications associated with diabetes and hypertension imposes significant costs on health care systems. This study estimated the hospitalization costs for inpatients in a public hospital in Zimbabwe. Methods. The study was retrospective and utilized secondary data from medical records. Total hospitalization costs were estimated using generalized linear models. Results. The median cost and interquartile range (IQR) for patients with diabetes, $994 (385–1553) mean $1319 (95% CI: 981–1657), was higher than patients with hypertension, $759 (494–1147) mean $914 (95% CI: 825–1003). Female patients aged below 65 years with diabetes had the highest estimated mean costs ($1467 (95% CI: 1177–1828)). Wound care had the highest estimated mean cost of all procedures, $2884 (95% CI: 2004–4149) for patients with diabetes and $2239 (95% CI: 1589–3156) for patients with hypertension. Age below 65 years, medical procedures (amputation, wound care, dialysis, and physiotherapy), the presence of two or more comorbidities, and being prescribed two or more drugs were associated with significantly higher hospitalization costs. Conclusion. Our estimated costs could be used to evaluate and improve current inpatient treatment and management of patients with diabetes and hypertension and determine the most cost-effective interventions to prevent complications and comorbidities. PMID:27403444
Systems Engineering Programmatic Estimation Using Technology Variance
NASA Technical Reports Server (NTRS)
Mog, Robert A.
2000-01-01
Unique and innovative system programmatic estimation is conducted using the variance of the packaged technologies. Covariance analysis is performed on the subsystems and components comprising the system of interest. Technological "return" and "variation" parameters are estimated. These parameters are combined with the model error to arrive at a measure of system development stability. The resulting estimates provide valuable information concerning the potential cost growth of the system under development.
NASA Technical Reports Server (NTRS)
Shaw, Eric J.
2001-01-01
This paper will report on the activities of the IAA Launcher Systems Economics Working Group in preparations for its Launcher Systems Development Cost Behavior Study. The Study goals include: improve launcher system and other space system parametric cost analysis accuracy; improve launcher system and other space system cost analysis credibility; and provide launcher system and technology development program managers and other decisionmakers with useful information on development cost impacts of their decisions. The Working Group plans to explore at least the following five areas in the Study: define and explain development cost behavior terms and concepts for use in the Study; identify and quantify sources of development cost and cost estimating uncertainty; identify and quantify significant influences on development cost behavior; identify common barriers to development cost understanding and reduction; and recommend practical, realistic strategies to accomplish reductions in launcher system development cost.
Assessment of industrial applications for fuel cell cogeneration systems
NASA Technical Reports Server (NTRS)
Stickles, R. P.; Oneill, J. K.; Smith, E. H.
1978-01-01
The fuel cell energy systems are designed with and without a utility connection for emergency back-up power. Sale of electricity to the utility during periods of low plant demand is not considered. For each of the three industrial applications, conceptual designs were also developed for conventional utility systems relying on purchased electric power and fossil-fired boilers for steam/hot water. The capital investment for each energy system is estimated. Annual operating costs are also determined for each system. These cost estimates are converted to levelized annual costs by applying appropriate economic factors. The breakeven electricity price that would make fuel cell systems competitive with the conventional systems is plotted as a function of naphtha price. The sensitivity of the breakeven point to capital investment and coal price is also evaluated.
NASA Technical Reports Server (NTRS)
Selcuk, M. K.
1976-01-01
A solar heat collection system employing non-tracking reflectors integrated with a fixed vacuum tube receiver which achieves modest year-round concentration (about 2) of the sunlight at low capital costs is discussed. The axis of the vee-trough reflector lies in a east-west direction and requires reversal of the reflector surfaces only twice a year without disturbing the receiver tubes and associated plumbing. It collects most of the diffuse flux. The vacuum tube receiver with selective absorber has no convection losses while radiation and conduction losses are minimal. Significant cost reductions are offered since the vee-trough can be fabricated from inexpensive polished or plastic reflector laminated sheet metal covering 2/3 of the collection area, and only about 1/3 of the area is covered with the more expensive vacuum tube receivers. Thermal and economic performance of the vee-trough vacuum tube system, year-round variation of the concentration factor, incident flux, useful heat per unit area at various operation temperatures and energy cost estimates are presented. The electrical energy cost is estimated to be 77 mills/kWh, and the system construction cost is estimated to be $1140/kWe.
Solar power satellite cost estimate
NASA Technical Reports Server (NTRS)
Harron, R. J.; Wadle, R. C.
1981-01-01
The solar power configuration costed is the 5 GW silicon solar cell reference system. The subsystems identified by work breakdown structure elements to the lowest level for which cost information was generated. This breakdown divides into five sections: the satellite, construction, transportation, the ground receiving station and maintenance. For each work breakdown structure element, a definition, design description and cost estimate were included. An effort was made to include for each element a reference that more thoroughly describes the element and the method of costing used. All costs are in 1977 dollars.
Cost analysis of Navy acquisition alternatives for the NAVSTAR Global Positioning System
NASA Astrophysics Data System (ADS)
Darcy, T. F.; Smith, G. P.
1982-12-01
This research analyzes the life cycle cost (LCC) of the Navy's current and two hypothetical procurement alternatives for NAVSTAR Global Positioning System (GPS) user equipment. Costs are derived by the ARINC Research Corporation ACBEN cost estimating system. Data presentation is in a comparative format describing individual alternative LCC and differential costs between alternatives. Sensitivity analysis explores the impact receiver-processor unit (RPU) first unit production cost has on individual alternative LCC, as well as cost differentials between each alternative. Several benefits are discussed that might provide sufficient cost savings and/or system effectiveness improvements to warrant a procurement strategy other than the existing proposal.
DOT National Transportation Integrated Search
2009-01-01
In 1992, Pickrell published a seminal piece examining the accuracy of ridership forecasts and capital cost estimates for fixed-guideway transit systems in the US. His research created heated discussions in the transit industry regarding the ability o...
48 CFR 436.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...
48 CFR 436.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...
48 CFR 36.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An independent...
48 CFR 1336.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award, the...
48 CFR 1336.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award, the...
48 CFR 1336.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award, the...
48 CFR 36.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An independent...
48 CFR 36.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An independent...
48 CFR 436.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...
48 CFR 436.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...
48 CFR 1336.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award, the...
48 CFR 36.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An independent...
48 CFR 436.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...
48 CFR 36.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An independent...
48 CFR 1336.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award, the...
2002 IDA Cost Research Symposium: Estimating the Costs of Transforming U.S. Military Forces
2002-08-01
FY00 billing rates for the following contractors and locations: Lockheed- Martin (Fort Worth, Palmdale, and Marietta ), Boeing (Puget Sound, Southern...2001 “Econometric Modeling of Acquisition Category I Systems at the Lockheed- Martin Plant in Marietta , Georgia,” IDA Paper P-3590, July 2001...Improvement Group (CAIG) in the Office of the Secretary of Defense (OSD) provides independent cost estimates and reports on life-cycle costs of major
Training Technology Handbook for System Acquisition Planners: Preliminary Version.
1981-09-01
relied upon to estimate training resources and -validation of program characteristics costs during the phases of the WSAP. The figure also 0 Ful- Sale ...COST (fIR ITUNENT 0 THIS IS All ESTIMATE ASED On TYPICAL RIOUIREOnT FOR THIS KIM OF SYSTEM p 45 i 8aSI U SI I i I I I ] | Ja I I I I a’ * I
Ebola in the Netherlands, 2014-2015: costs of preparedness and response.
Suijkerbuijk, Anita W M; Swaan, Corien M; Mangen, Marie-Josee J; Polder, Johan J; Timen, Aura; Ruijs, Wilhelmina L M
2017-11-17
The recent epidemic of Ebola virus disease (EVD) resulted in countries worldwide to prepare for the possibility of having an EVD patient. In this study, we estimate the costs of Ebola preparedness and response borne by the Dutch health system. An activity-based costing method was used, in which the cost of staff time spent in preparedness and response activities was calculated based on a time-recording system and interviews with key professionals at the healthcare organizations involved. In addition, the organizations provided cost information on patient days of hospitalization, laboratory tests, personal protective equipment (PPE), as well as the additional cleaning and disinfection required. The estimated total costs averaged €12.6 million, ranging from €6.7 to €22.5 million. The main cost drivers were PPE expenditures and preparedness activities of personnel, especially those associated with ambulance services and hospitals. There were 13 possible cases clinically evaluated and one confirmed case admitted to hospital. The estimated total cost of EVD preparedness and response in the Netherlands was substantial. Future costs might be reduced and efficiency increased by designating one ambulance service for transportation and fewer hospitals for the assessment of possible patients with a highly infectious disease of high consequences.
Estimating and bidding for the Space Station Processing Facility
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 10 more ways the low bidder got low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
NASA Technical Reports Server (NTRS)
Lee, Taesik; Jeziorek, Peter
2004-01-01
Large complex projects cost large sums of money throughout their life cycle for a variety of reasons and causes. For such large programs, the credible estimation of the project cost, a quick assessment of the cost of making changes, and the management of the project budget with effective cost reduction determine the viability of the project. Cost engineering that deals with these issues requires a rigorous method and systematic processes. This paper introduces a logical framework to a&e effective cost engineering. The framework is built upon Axiomatic Design process. The structure in the Axiomatic Design process provides a good foundation to closely tie engineering design and cost information together. The cost framework presented in this paper is a systematic link between the functional domain (FRs), physical domain (DPs), cost domain (CUs), and a task/process-based model. The FR-DP map relates a system s functional requirements to design solutions across all levels and branches of the decomposition hierarchy. DPs are mapped into CUs, which provides a means to estimate the cost of design solutions - DPs - from the cost of the physical entities in the system - CUs. The task/process model describes the iterative process ot-developing each of the CUs, and is used to estimate the cost of CUs. By linking the four domains, this framework provides a superior traceability from requirements to cost information.
Oak Ridge Spallation Neutron Source (ORSNS) target station design integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamy, T.; Booth, R.; Cleaves, J.
1996-06-01
The conceptual design for a 1- to 3-MW short pulse spallation source with a liquid mercury target has been started recently. The design tools and methods being developed to define requirements, integrate the work, and provide early cost guidance will be presented with a summary of the current target station design status. The initial design point was selected with performance and cost estimate projections by a systems code. This code was developed recently using cost estimates from the Brookhaven Pulsed Spallation Neutron Source study and experience from the Advanced Neutron Source Project`s conceptual design. It will be updated and improvedmore » as the design develops. Performance was characterized by a simplified figure of merit based on a ratio of neutron production to costs. A work breakdown structure was developed, with simplified systems diagrams used to define interfaces and system responsibilities. A risk assessment method was used to identify potential problems, to identify required research and development (R&D), and to aid contingency development. Preliminary 3-D models of the target station are being used to develop remote maintenance concepts and to estimate costs.« less
Modelling the resource implications and budget impact of managing cow milk allergy in Australia.
Guest, J F; Nagy, E
2009-02-01
To estimate the resource implications and budget impact of current clinical practice for managing cow milk allergy (CMA) in Australia, from the perspective of the publicly funded healthcare system. A decision model was constructed using published clinical outcomes and clinician-derived resource utilisation estimates. The model was used to estimate the expected 6-monthly levels of healthcare resource use and corresponding costs attributable to managing 6150 new CMA sufferers following referral to a specialist. The expected 6-monthly costs of managing 6150 newly-diagnosed infants with CMA following referral to a specialist was an estimated (Australian dollars, AU$) AU$6.5 million at 2006/07 prices. Clinical nutrition preparations were found to be the primary cost driver accounting for 62% of the total 6-monthly cost and clinician visits were the secondary cost driver accounting for up to a further 28% of the total 6-monthly cost. Sensitivity analysis showed there would be fewer visits to hospital-based paediatric gastroenterologists and paediatric immunologists/allergists if all newly-diagnosed patients were prescribed an amino acid formula (AAF) following referral to a specialist, instead of being managed according to current practice. CMA imposes a substantial burden on the publicly funded healthcare system in Australia. However, using an AAF as the initial treatment for CMA can potentially release limited hospital resources for alternative use within the paediatric healthcare system.
Michael D. Erickson; Curt C. Hassler; Chris B. LeDoux
1991-01-01
Continuous time and motion study techniques were used to develop productivity and cost estimators for the skidding component of ground-based logging systems, operating on steep terrain using preplanned skid roads. Comparisons of productivity and costs were analyzed for an overland random access skidding method, verses a skidding method utilizing a network of preplanned...
The common engine concept for ALS application - A cost reduction approach
NASA Technical Reports Server (NTRS)
Bair, E. K.; Schindler, C. M.
1989-01-01
Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-09-01
The final report is presented of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 5408 Williamsburg Road, Richmond, Virginia. The description of the system is given along with the final cost breakdown, expected performance data and expected payback time for the installed system is estimated to be approximately five (5) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryersmore » used for the laundry. The success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
Air-cushion tankers for Alaskan North Slope oil
NASA Technical Reports Server (NTRS)
Anderson, J. L.
1973-01-01
A concept is described for transporting oil from the Arctic to southern markets in 10,000-ton, chemically fueled air-cushion vehicles (ACV's) configured as tankers. Based on preliminary cost estimates the conceptual ACV tanker system as tailored to the transportation of Alaskan North Slope oil could deliver the oil for about the same price per barrel as the proposed trans-Alaska pipeline with only one-third of the capital investment. The report includes the description of the conceptual system and its operation; preliminary cost estimates; an appraisal of ACV tanker development; and a comparison of system costs, versatility, vulnerability, and ecological effect with those of the trans-Alaska pipeline.
Occupational disease and workers' compensation: coverage, costs, and consequences.
Leigh, J Paul; Robbins, John A
2004-01-01
Most of the costs of occupational disease are not covered by workers' compensation. First, the authors estimated the deaths and costs for all occupational disease in 1999, using epidemiological studies. Among the greatest contributors were job-related cancer, chronic respiratory disease, and circulatory disease. Second, the authors estimated the number of workers' compensation cases, costs, and deaths for 1999, using data from up to 16 states representing all regions of the country. Unlike the epidemiological studies that emphasized fatal diseases, the workers' compensation estimates emphasized nonfatal diseases and conditions like tendonitis and hernia. Comparisons of the epidemiological and workers' compensation estimates suggest that in 1999, workers' compensation missed roughly 46,000 to 93,000 deaths and 8 billion US dollars to 23 billion US dollars in medical costs. These deaths and costs represented substantial cost shifting from workers' compensation systems to individual workers, their families, private medical insurance, and taxpayers (through Medicare and Medicaid). Designing policies to reduce the cost shifting and its associated inefficiency will be challenging.
Occupational Disease and Workers’ Compensation: Coverage, Costs, and Consequences
Leigh, J Paul; Robbins, John A
2004-01-01
Most of the costs of occupational disease are not covered by workers’ compensation. First, the authors estimated the deaths and costs for all occupational disease in 1999, using epidemiological studies. Among the greatest contributors were job-related cancer, chronic respiratory disease, and circulatory disease. Second, the authors estimated the number of workers’ compensation cases, costs, and deaths for 1999, using data from up to 16 states representing all regions of the country. Unlike the epidemiological studies that emphasized fatal diseases, the workers’ compensation estimates emphasized nonfatal diseases and conditions like tendonitis and hernia. Comparisons of the epidemiological and workers’ compensation estimates suggest that in 1999, workers’ compensation missed roughly 46,000 to 93,000 deaths and $8 billion to $23 billion in medical costs. These deaths and costs represented substantial cost shifting from workers’ compensation systems to individual workers, their families, private medical insurance, and taxpayers (through Medicare and Medicaid). Designing policies to reduce the cost shifting and its associated inefficiency will be challenging. PMID:15595947
COSTS OF URBAN STORMWATER CONTROL
This report presents information on the cost of stormwater pollution control facilities in urban areas, including collection, control, and treatment systems. Information on prior cost studies of control technologies and cost estimating models used in these studies was collected,...
COSTS OF URBAN STORMWATER CONTROL
This paper presents information on the cost of stormwater pollution control facilities in urban areas, including collection, control, and treatment systems. Information on prior cost studies of control technologies and cost estimating models used in these studies was collected, r...
48 CFR 9904.401-61 - Interpretation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-61 Section 9904.401-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE... ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-61 Interpretation. (a) 9904.401, Cost Accounting... accounting practices used in accumulating and reporting costs.” (b) In estimating the cost of direct material...
DOT National Transportation Integrated Search
2001-07-01
This working paper has been prepared to provide new estimates of the costs to deploy Intelligent Transportation System (ITS) infrastructure elements in the largest metropolitan areas in the United States. It builds upon estimates that were distribute...
DOT National Transportation Integrated Search
2000-08-01
This working paper has been prepared to provide new estimates of the costs to deploy Intelligent Transportation System (ITS) infrastructure elements in the largest metropolitan areas in the United States. It builds upon estimates that were distribute...
Phase III : GIS for the Appalachian Development Highway System 2007 cost to complete estimate
DOT National Transportation Integrated Search
2008-02-01
The proposed research will create an ADHS GIS for integrating and disseminating GIS and transportation data that will increase the accuracy and efficiency associated with completing the 2007 ADHS Cost to Complete Estimate. This project will create ap...
Cost of wetland protection using cable logging systems
Chris B. LeDoux; John E. Baumgras
1990-01-01
Forest managers, loggers, land-use planners, and other decision makers need an understanding of estimating the cost of protecting wetlands using cable logging systems to harvest timber products. Results suggest that protection costs can range from $244.75 to $489.50 per acre depending on the degree of protection desired.
A Compact VLSI System for Bio-Inspired Visual Motion Estimation.
Shi, Cong; Luo, Gang
2018-04-01
This paper proposes a bio-inspired visual motion estimation algorithm based on motion energy, along with its compact very-large-scale integration (VLSI) architecture using low-cost embedded systems. The algorithm mimics motion perception functions of retina, V1, and MT neurons in a primate visual system. It involves operations of ternary edge extraction, spatiotemporal filtering, motion energy extraction, and velocity integration. Moreover, we propose the concept of confidence map to indicate the reliability of estimation results on each probing location. Our algorithm involves only additions and multiplications during runtime, which is suitable for low-cost hardware implementation. The proposed VLSI architecture employs multiple (frame, pixel, and operation) levels of pipeline and massively parallel processing arrays to boost the system performance. The array unit circuits are optimized to minimize hardware resource consumption. We have prototyped the proposed architecture on a low-cost field-programmable gate array platform (Zynq 7020) running at 53-MHz clock frequency. It achieved 30-frame/s real-time performance for velocity estimation on 160 × 120 probing locations. A comprehensive evaluation experiment showed that the estimated velocity by our prototype has relatively small errors (average endpoint error < 0.5 pixel and angular error < 10°) for most motion cases.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allard, S.M.; Albert, N.F.
1992-09-18
Cost estimates for USMC SINCGARS usage of BB-5590/U Lithium Sulfur Dioxide (LiSO[sub 2]) Batteries, BA-590/U Sealed Lead-Acid Batteries, and BB-490/U Nickel-Cadmium (Ni-Cad) Batteries. Estimates encompass battery costs, charger costs as applicable, and disposal costs. Annual battery-related costs were estimated for USMC usage of mix of LiSO[sub 2] and Ni-Cad batteries ranging from 100% use of LiSO[sub 2] batteries to 100% use of Ni-Cad batteries; and for mix of LiSO[sub 2] and Lead-Acid batteries over the same range. Estimated hourly battery-related costs are $2.66 per hour for LiSO[sub 2] batteries $0.34 for Ni-Cad batteries, and $0.30 for Lead-Acid batteries. Disposal relatedmore » regulations and related documents are discussed and included in Appendices.« less
TVA GIS-based biomass resource assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Noon, C.E.
1993-12-31
The focus of this paper is a computer-based system for estimating the costs of supplying wood fuel. The system is being developed for the Tennessee Valley Authority and is referred to as the Biomass Resource Assessment Version One (BRAVO) system. The main objective in developing the BRAVO system is to assist TVA in estimating the costs for supplying wood fuel to any one of its twelve coal-fired plants. The BRAVO system is developed within a Geographic Information System (GIS) platform and is designed to allow a user to perform {open_quotes}what if{close_quotes} analyses related to the costs of wood fuel supply.more » Three types of wood fuel are considered in the BRAVO system: mill residues, logging residues and short-rotation woody crops (SRWC). Each type of wood fuel has unique economic and supply characteristics. The input data for the system includes the specific locations, amount, and prices of the various types of wood fuel throughout the TVA region. The system input is completed by data on political boundaries, power plant locations, road networks and a model for estimating transportation costs as a function of distance. The result is a comprehensive system which includes information on all possible wood fuel supply joints, demand points and product movement costs. In addition, the BRAVO system has been designed to allow a user to perform sensitivity analysis on a variety of supply system parameters. This will enable TVA to thoroughly investigate the financial impacts of issues such as increased competition for wood fuel, environmental policies, fuel taxes, and regional economic cycles.« less
2012-08-01
Command NBCD Nuclear, Biological, and Chemical Defence NCCA U.S. Naval Center for Cost Analysis NGISSI Northrop Grumman Integrated Systems...analysis (CPA) in the United States which investigated how costs, capabilities, and risks could be examined together in an attempt to engen - der more
Granados-García, Víctor; Velázquez, F Raúl; Salmerón, Jorge; Homedes, Nuria; Salinas-Escudero, Guillermo; Morales-Cisneros, Gabriela
2011-09-02
To estimate the health impact and the costs of treatment associated with rotavirus diarrhea in six yearly cohorts (2001-2006) of Mexican infants. The perspective of study is from the health care system. We estimated the effect of rotavirus diarrhea on disability adjusted life years (DALYS) and diarrhea treatment costs in hypothetical cohorts of infants who are followed from birth up to five years of age beginning in years from 2001 to 2006. We used information from administrative databases on mortality and health care from the National System of Information on Health and from the Mexican Institute for Social Security to feed a decision analysis to project the burden of disease and costs of treatment. Estimates of DALYS were 19,426 in 2001 and decreased by 28.9% for 2006 meanwhile costs of treatment were relatively constant, estimated at US$ 38.7 million and increased only by 5%. Rotavirus diarrhea in Mexican children is a major disease burden, presenting significant treatment costs. Rotavirus diarrhea mortality is decreasing; however this has not led to a steady decrease in treatment costs in the 6 years period of analysis. A sensitivity analysis showed that incidences of rotavirus diarrhea as well as the parameters associated with health-care access were the main factors, which had a significant effect on the projected burden of disease and costs. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Glier, Justin C.
In an effort to lower future CO2 emissions, a wide range of technologies are being developed to scrub CO2 from the flue gases of fossil fuel-based electric power and industrial plants. This thesis models one of several early-stage post-combustion CO2 capture technologies, solid sorbent-based CO2 capture process, and presents performance and cost estimates of this system on pulverized coal power plants. The spreadsheet-based software package Microsoft Excel was used in conjunction with AspenPlus modelling results and the Integrated Environmental Control Model to develop performance and cost estimates for the solid sorbent-based CO2 capture technology. A reduced order model also was created to facilitate comparisons among multiple design scenarios. Assumptions about plant financing and utilization, as well as uncertainties in heat transfer and material design that affect heat exchanger and reactor design were found to produce a wide range of cost estimates for solid sorbent-based systems. With uncertainties included, costs for a supercritical power plant with solid sorbent-based CO2 capture ranged from 167 to 533 per megawatt hour for a first-of-a-kind installation (with all costs in constant 2011 US dollars) based on a 90% confidence interval. The median cost was 209/MWh. Post-combustion solid sorbent-based CO2 capture technology is then evaluated in terms of the potential cost for a mature system based on historic experience as technologies are improved with sequential iterations of the currently available system. The range costs for a supercritical power plant with solid sorbent-based CO2 capture was found to be 118 to 189 per megawatt hour with a nominal value of 163 per megawatt hour given the expected range of technological improvement in the capital and operating costs and efficiency of the power plant after 100 GW of cumulative worldwide experience. These results suggest that the solid sorbent-based system will not be competitive with currently available liquid amine-systems in the absence of significant new improvements in solid sorbent properties and process system design to reduce the heat exchange surface area in the regenerator and cross-flow heat exchanger. Finally, the importance of these estimates for policy makers is discussed.
Mvundura, Mercy; Kien, Vu Duy; Nga, Nguyen Tuyet; Robertson, Joanie; Cuong, Nguyen Van; Tung, Ho Thanh; Hong, Duong Thi; Levin, Carol
2014-02-07
Few studies document the costs of operating vaccine supply chains, but decision-makers need this information to inform cost projections for investments to accommodate new vaccine introduction. This paper presents empirical estimates of vaccine supply chain costs for Vietnam's Expanded Program on Immunization (EPI) for routine vaccines at each level of the supply chain, before and after the introduction of the pentavalent vaccine. We used micro-costing methods to collect resource-use data associated with storage and transportation of vaccines and immunization supplies at the national store, the four regional stores, and a sample of provinces, districts, and commune health centers. We collected stock ledger data on the total number of doses of vaccines handled by each facility during the assessment year. Total supply chain costs were estimated at approximately US$65,000 at the national store and an average of US$39,000 per region, US$5800 per province, US$2200 per district, and US$300 per commune health center. Across all levels, cold chain equipment capital costs and labor were the largest drivers of costs. The cost per dose delivered was estimated at US$0.19 before the introduction of pentavalent and US$0.24 cents after introduction. At commune health centers, supply chain costs were 104% of the value of vaccines before introduction of pentavalent vaccine and 24% after introduction, mainly due to the higher price per dose of the pentavalent vaccine. The aggregated costs at the last tier of the health system can be substantial because of the large number of facilities. Even in countries with high-functioning systems, empirical evidence on current costs from all levels of the system can help estimate resource requirements for expanding and strengthening resources to meet future immunization program needs. Other low- and middle-income countries can benefit from similar studies, in view of new vaccine introductions that will put strains on existing systems. Copyright © 2013 Elsevier Ltd. All rights reserved.
Strategic Methodologies in Public Health Cost Analyses.
Whittington, Melanie; Atherly, Adam; VanRaemdonck, Lisa; Lampe, Sarah
The National Research Agenda for Public Health Services and Systems Research states the need for research to determine the cost of delivering public health services in order to assist the public health system in communicating financial needs to decision makers, partners, and health reform leaders. The objective of this analysis is to compare 2 cost estimation methodologies, public health manager estimates of employee time spent and activity logs completed by public health workers, to understand to what degree manager surveys could be used in lieu of more time-consuming and burdensome activity logs. Employees recorded their time spent on communicable disease surveillance for a 2-week period using an activity log. Managers then estimated time spent by each employee on a manager survey. Robust and ordinary least squares regression was used to measure the agreement between the time estimated by the manager and the time recorded by the employee. The 2 outcomes for this study included time recorded by the employee on the activity log and time estimated by the manager on the manager survey. This study was conducted in local health departments in Colorado. Forty-one Colorado local health departments (82%) agreed to participate. Seven of the 8 models showed that managers underestimate their employees' time, especially for activities on which an employee spent little time. Manager surveys can best estimate time for time-intensive activities, such as total time spent on a core service or broad public health activity, and yet are less precise when estimating discrete activities. When Public Health Services and Systems Research researchers and health departments are conducting studies to determine the cost of public health services, there are many situations in which managers can closely approximate the time required and produce a relatively precise approximation of cost without as much time investment by practitioners.
Seminar presentation on the economic evaluation of the space shuttle system
NASA Technical Reports Server (NTRS)
1973-01-01
The proceedings of a seminar on the economic aspects of the space shuttle system are presented. Emphasis was placed on the problems of economic analysis of large scale public investments, the state of the art of cost estimation, the statistical data base for estimating costs of new technological systems, and the role of the main economic parameters affecting the results of the analyses. An explanation of the system components of a space program and the present choice of launch vehicles, spacecraft, and instruments was conducted.
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1979-01-01
Appendixes for Volume 2 (Part 2) of a seven volume Satellite (SPS) report are presented. The document contains two appendixes. The first is a SPS work breakdown structure dictionary. The second gives SPS cost estimating relationships and contains the cost analyses and a description of cost elements that comprise the SPS program.
A Cost Prediction Model for Electronic Systems Flight Test Costs.
1983-09-01
development. It was found that a significant cost estimating relationship (CER) exists between costs and the characteristics of the flight test design. Using...University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Systems Management By C ., Thomas 3. DuPre’, BS Accession...SYSTEMS MANAGEMENT DATE: 28 September 1983 COMMITTEE CHA. ICEAfER it TABLE OF CONTENTS Page LIST OF TABLES ......................... vi LIST OF FIGURES
NASA Technical Reports Server (NTRS)
Cannon, I.; Balcer, S.; Cochran, M.; Klop, J.; Peterson, S.
1991-01-01
An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.
The economic costs of malaria in children in three sub-Saharan countries: Ghana, Tanzania and Kenya
2013-01-01
Background Malaria causes significant mortality and morbidity in sub-Saharan Africa (SSA), especially among children less than five years of age (U5 children). Although the economic burden of malaria in this region has been assessed previously, the extent and variation of this burden remains unclear. This study aimed to estimate the economic costs of malaria in U5 children in three countries (Ghana, Tanzania and Kenya). Methods Health system and household costs previously estimated were integrated with costs associated with co-morbidities, complications and productivity losses due to death. Several models were developed to estimate the expected treatment cost per episode per child, across different age groups, by level of severity and with or without controlling for treatment-seeking behaviour. Total annual costs (2009) were calculated by multiplying the treatment cost per episode according to severity by the number of episodes. Annual health system prevention costs were added to this estimate. Results Household and health system costs per malaria episode ranged from approximately US$ 5 for non-complicated malaria in Tanzania to US$ 288 for cerebral malaria with neurological sequelae in Kenya. On average, up to 55% of these costs in Ghana and Tanzania and 70% in Kenya were assumed by the household, and of these costs 46% in Ghana and 85% in Tanzania and Kenya were indirect costs. Expected values of potential future earnings (in thousands) lost due to premature death of children aged 0–1 and 1–4 years were US$ 11.8 and US$ 13.8 in Ghana, US$ 6.9 and US$ 8.1 in Tanzania, and US$ 7.6 and US$ 8.9 in Kenya, respectively. The expected treatment costs per episode per child ranged from a minimum of US$ 1.29 for children aged 2–11 months in Tanzania to a maximum of US$ 22.9 for children aged 0–24 months in Kenya. The total annual costs (in millions) were estimated at US$ 37.8, US$ 131.9 and US$ 109.0 nationwide in Ghana, Tanzania and Kenya and included average treatment costs per case of US$ 11.99, US$ 6.79 and US$ 20.54, respectively. Conclusion This study provides important insight into the economic burden of malaria in SSA that may assist policy makers when designing future malaria control interventions. PMID:24004482
A Leo Satellite Navigation Algorithm Based on GPS and Magnetometer Data
NASA Technical Reports Server (NTRS)
Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack
2001-01-01
The Global Positioning System (GPS) has become a standard method for low cost onboard satellite orbit determination. The use of a GPS receiver as an attitude and rate sensor has also been developed in the recent past. Additionally, focus has been given to attitude and orbit estimation using the magnetometer, a low cost, reliable sensor. Combining measurements from both GPS and a magnetometer can provide a robust navigation system that takes advantage of the estimation qualities of both measurements. Ultimately, a low cost, accurate navigation system can result, potentially eliminating the need for more costly sensors, including gyroscopes. This work presents the development of a technique to eliminate numerical differentiation of the GPS phase measurements and also compares the use of one versus two GPS satellites.
Edwards, Mervyn; Nathanson, Andrew; Wisch, Marcus
2014-01-01
The objective of the current study was to estimate the benefit for Europe of fitting precrash braking systems to cars that detect pedestrians and autonomously brake the car to prevent or lower the speed of the impact with the pedestrian. The analysis was divided into 2 main parts: (1) Develop and apply methodology to estimate benefit for Great Britain and Germany; (2) scale Great Britain and German results to give an indicative estimate for Europe (EU27). The calculation methodology developed to estimate the benefit was based on 2 main steps: 1. Calculate the change in the impact speed distribution curve for pedestrian casualties hit by the fronts of cars assuming pedestrian autonomous emergency braking (AEB) system fitment. 2. From this, calculate the change in the number of fatally, seriously, and slightly injured casualties by using the relationship between risk of injury and the casualty impact speed distribution to sum the resulting risks for each individual casualty. The methodology was applied to Great Britain and German data for 3 types of pedestrian AEB systems representative of (1) currently available systems; (2) future systems with improved performance, which are expected to be available in the next 2-3 years; and (3) reference limit system, which has the best performance currently thought to be technically feasible. Nominal benefits estimated for Great Britain ranged from £119 million to £385 million annually and for Germany from €63 million to €216 million annually depending on the type of AEB system assumed fitted. Sensitivity calculations showed that the benefit estimated could vary from about half to twice the nominal estimate, depending on factors such as whether or not the system would function at night and the road friction assumed. Based on scaling of estimates made for Great Britain and Germany, the nominal benefit of implementing pedestrian AEB systems on all cars in Europe was estimated to range from about €1 billion per year for current generation AEB systems to about €3.5 billion for a reference limit system (i.e., best performance thought technically feasible at present). Dividing these values by the number of new passenger cars registered in Europe per year gives an indication that the cost of a system per car should be less than ∼€80 to ∼€280 for it to be cost effective. The potential benefit of fitting AEB systems to cars in Europe for pedestrian protection has been estimated and the results interpreted to indicate the upper limit of cost for a system to allow it to be cost effective.
48 CFR 736.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...
48 CFR 736.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...
48 CFR 736.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...
48 CFR 736.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...
48 CFR 736.605 - Government cost estimate for architect-engineer work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...
Pataky, Reka; Bremner, Karen E.; Rangrej, Jagadish; Chan, Kelvin K.W.; Cheung, Winson Y.; Hoch, Jeffrey S.; Peacock, Stuart; Krahn, Murray D.
2017-01-01
Background: Costing studies are useful to measure the economic burden of cancer. Comparing costs between healthcare systems can inform evaluation, development or modification of cancer care policies. Objectives: To estimate and compare cancer costs in British Columbia and Ontario from the payers' perspectives. Methods: Using linked cancer registry and administrative data, and standardized costing methodology and analyses, we estimated costs for 21 cancer sites by phase of care to determine potential differences between provinces. Results: Overall, costs were higher in Ontario. Costs were highest in the initial post-diagnosis and pre-death phases and lowest in the pre-diagnosis and continuing phases, and generally higher for brain cancer and multiple myeloma, and lower for melanoma. Hospitalization was the major cost category. Costs for physician services and diagnostic tests differed the most between provinces. Conclusions: The standardization of data and costing methodology is challenging, but it enables interprovincial and international comparative costing analyses. PMID:28277207
Applications of EVA guidelines and design criteria. Volume 3: EVA systems cost model formating
NASA Technical Reports Server (NTRS)
Brown, N. E.
1973-01-01
The development of a model for estimating the impact of manned EVA costs on future payloads is discussed. Basic information on the EV crewman requirements, equipment, physical and operational characteristics, and vehicle interfaces is provided. The cost model is being designed to allow system designers to quantify the impact of EVA on vehicle and payload systems.
Research without billing data. Econometric estimation of patient-specific costs.
Barnett, P G
1997-06-01
This article describes a method for computing the cost of care provided to individual patients in health care systems that do not routinely generate billing data, but gather information on patient utilization and total facility costs. Aggregate data on cost and utilization were used to estimate how costs vary with characteristics of patients and facilities of the US Department of Veterans Affairs. A set of cost functions was estimated, taking advantage of the department-level organization of the data. Casemix measures were used to determine the costs of acute hospital and long-term care. Hospitalization for medical conditions cost an average of $5,642 per US Health Care Financing Administration diagnosis-related group weight; surgical hospitalizations cost $11,836. Nursing home care cost $197.33 per day, intermediate care cost $280.66 per day, psychiatric care cost $307.33 per day, and domiciliary care cost $111.84 per day. Outpatient visits cost an average of $90.36. These estimates include the cost of physician services. The econometric method presented here accounts for variation in resource use caused by casemix that is not reflected in length of stay and for the effects of medical education, research, facility size, and wage rates. Data on non-Veteran's Affairs hospital stays suggest that the method accounts for 40% of the variation in acute hospital care costs and is superior to cost estimates based on length of stay or diagnosis-related group weight alone.
Model implementation for dynamic computation of system cost for advanced life support
NASA Technical Reports Server (NTRS)
Levri, J. A.; Vaccari, D. A.
2004-01-01
Life support system designs for long-duration space missions have a multitude of requirements drivers, such as mission objectives, political considerations, cost, crew wellness, inherent mission attributes, as well as many other influences. Evaluation of requirements satisfaction can be difficult, particularly at an early stage of mission design. Because launch cost is a critical factor and relatively easy to quantify, it is a point of focus in early mission design. The method used to determine launch cost influences the accuracy of the estimate. This paper discusses the appropriateness of dynamic mission simulation in estimating the launch cost of a life support system. This paper also provides an abbreviated example of a dynamic simulation life support model and possible ways in which such a model might be utilized for design improvement. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.
Market Assessment of Forward-Looking Turbulence Sensing Systems
NASA Technical Reports Server (NTRS)
Kauffmann, Paul
2003-01-01
This viewgraph presentation provides a cost benefit analysis of three next-generation forward-looking turbulence sensing systems: X band turbulence radar system for convective turbulence, LIDAR based turbulence systems to sense clear air turbulence and a combined hybrid system. Parameters for the cost benefit analysis were established using a business model which considered injury rates, cost of injuries, indirect costs, market penetration rate estimates and product success characteristics. Topics covered include: study approach, business case equations, data acquisition, benchmark analysis. Data interpretation from the cost benefit analysis is presented. The researchers conclude that the market potential for these products is based primarily on injury cost reduction and that X band radar systems have the greatest chance for commercial success.
An Application of UAV Attitude Estimation Using a Low-Cost Inertial Navigation System
NASA Technical Reports Server (NTRS)
Eure, Kenneth W.; Quach, Cuong Chi; Vazquez, Sixto L.; Hogge, Edward F.; Hill, Boyd L.
2013-01-01
Unmanned Aerial Vehicles (UAV) are playing an increasing role in aviation. Various methods exist for the computation of UAV attitude based on low cost microelectromechanical systems (MEMS) and Global Positioning System (GPS) receivers. There has been a recent increase in UAV autonomy as sensors are becoming more compact and onboard processing power has increased significantly. Correct UAV attitude estimation will play a critical role in navigation and separation assurance as UAVs share airspace with civil air traffic. This paper describes attitude estimation derived by post-processing data from a small low cost Inertial Navigation System (INS) recorded during the flight of a subscale commercial off the shelf (COTS) UAV. Two discrete time attitude estimation schemes are presented here in detail. The first is an adaptation of the Kalman Filter to accommodate nonlinear systems, the Extended Kalman Filter (EKF). The EKF returns quaternion estimates of the UAV attitude based on MEMS gyro, magnetometer, accelerometer, and pitot tube inputs. The second scheme is the complementary filter which is a simpler algorithm that splits the sensor frequency spectrum based on noise characteristics. The necessity to correct both filters for gravity measurement errors during turning maneuvers is demonstrated. It is shown that the proposed algorithms may be used to estimate UAV attitude. The effects of vibration on sensor measurements are discussed. Heuristic tuning comments pertaining to sensor filtering and gain selection to achieve acceptable performance during flight are given. Comparisons of attitude estimation performance are made between the EKF and the complementary filter.
Hospitalizations due to rotavirus gastroenteritis in Catalonia, Spain, 2003-2008
2011-01-01
Background Rotavirus is the most common cause of severe gastroenteritis among young children in Spain and worldwide. We evaluated hospitalizations due to community and hospital-acquired rotavirus gastroenteritis (RVGE) and estimated related costs in children under 5 years old in Catalonia, Spain. Results We analyzed hospital discharge data from the Catalan Health Services regarding hospital admissions coded as infectious gastroenteritis in children under 5 for the period 2003-2008. In order to estimate admission incidence, we used population estimates for each study year published by the Statistic Institut of Catalonia (Idescat). The costs associated with hospital admissions due to rotavirus diarrhea were estimated for the same years. A decision tree model was used to estimate the threshold cost of rotavirus vaccine to achieve cost savings from the healthcare system perspective in Catalonia. From 2003 through 2008, 10655 children under 5 years old were admitted with infectious gastroenteritis (IGE). Twenty-two percent of these admissions were coded as RVGE, yielding an estimated average annual incidence of 104 RVGE hospitalizations per 100000 children in Catalonia. Eighty seven percent of admissions for RVGE occurred during December through March. The mean hospital stay was 3.7 days, 0.6 days longer than for other IGE. An additional 892 cases of presumed nosocomial RVGE were detected, yielding an incidence of 2.5 cases per 1000 child admissions. Total rotavirus hospitalization costs due to community acquired RVGE for the years 2003 and 2008 were 431,593 and 809,224 €, respectively. According to the estimated incidence and hospitalization costs, immunization would result in health system cost savings if the cost of the vaccine was 1.93 € or less. At a vaccine cost of 187 € the incremental cost per hospitalization prevented is 195,388 € (CI 95% 159,300; 238,400). Conclusions The burden of hospitalizations attributable to rotavirus appeared to be lower in Catalonia than in other regions of Spain and Europe. The relatively low incidence of hospitalization due to rotavirus makes rotavirus vaccination less cost-effective in Catalonia than in other areas with higher rotavirus disease burden. PMID:22013948
An economic analysis of a commercial approach to the design and fabrication of a space power system
NASA Technical Reports Server (NTRS)
Putney, Z.; Been, J. F.
1979-01-01
A commercial approach to the design and fabrication of an economical space power system is presented. Cost reductions are projected through the conceptual design of a 2 kW space power system built with the capability for having serviceability. The approach to system costing that is used takes into account both the constraints of operation in space and commercial production engineering approaches. The cost of this power system reflects a variety of cost/benefit tradeoffs that would reduce system cost as a function of system reliability requirements, complexity, and the impact of rigid specifications. A breakdown of the system design, documentation, fabrication, and reliability and quality assurance cost estimates are detailed.
The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements
NASA Technical Reports Server (NTRS)
Zapata, Edgar
2017-01-01
In 2011, NASA released a report assessing the market for commercial crew and cargo services to low Earth orbit (LEO). The report stated that NASA had spent a few hundred million dollars in the Commercial Orbital Transportation Services (COTS) program on the portion related to the development of the Falcon 9 launch vehicle. Yet a NASA cost model predicted the cost would have been significantly more with a non-commercial cost-plus contracting approach. By 2016 a NASA request for information stated it must "maximize the efficiency and sustainability of the Exploration Systems development programs", as "critical to free resources for reinvestment...such as other required deep space exploration capabilities." This work joins the previous two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for "...other required deep space exploration capabilities." These other capabilities include landers, stages and more. We mature the concept of "costed baseball cards", adding cost estimates to NASA's space systems "baseball cards." We show some potential costs, including analysis, the basis of estimates, data sources and caveats to address a critical question - based on initial assessment, are significant agency resources justified for more detailed analysis and due diligence to understand and invest in public private partnerships for human deep space exploration systems? The cost analysis spans commercial to cost-plus contracting approaches, for smaller elements vs. larger, with some variation for lunar or Mars. By extension, we delve briefly into the potentially much broader significance of the individual cost estimates if taken together as a NASA investment portfolio where public private partnership are stitched together for deep space exploration. How might multiple improvements in individual systems add up to NASA human deep space exploration achievements, realistically, affordably, sustainably, in a relevant timeframe?
Cost analysis of the Mercedes-Benz occupant detection system for air bag shut-off
DOT National Transportation Integrated Search
1997-04-01
The objective of this project is to develop the variable manufacturing costs and lead time estimates of an "occupant detection system for air bag shut off". The Mercedes-Benz system was used as a base for developing this data. The system consists of ...
Time-driven Activity-based Costing More Accurately Reflects Costs in Arthroplasty Surgery.
Akhavan, Sina; Ward, Lorrayne; Bozic, Kevin J
2016-01-01
Cost estimates derived from traditional hospital cost accounting systems have inherent limitations that restrict their usefulness for measuring process and quality improvement. Newer approaches such as time-driven activity-based costing (TDABC) may offer more precise estimates of true cost, but to our knowledge, the differences between this TDABC and more traditional approaches have not been explored systematically in arthroplasty surgery. The purposes of this study were to compare the costs associated with (1) primary total hip arthroplasty (THA); (2) primary total knee arthroplasty (TKA); and (3) three surgeons performing these total joint arthroplasties (TJAs) as measured using TDABC versus traditional hospital accounting (TA). Process maps were developed for each phase of care (preoperative, intraoperative, and postoperative) for patients undergoing primary TJA performed by one of three surgeons at a tertiary care medical center. Personnel costs for each phase of care were measured using TDABC based on fully loaded labor rates, including physician compensation. Costs associated with consumables (including implants) were calculated based on direct purchase price. Total costs for 677 primary TJAs were aggregated over 17 months (January 2012 to May 2013) and organized into cost categories (room and board, implant, operating room services, drugs, supplies, other services). Costs derived using TDABC, based on actual time and intensity of resources used, were compared with costs derived using TA techniques based on activity-based costing and indirect costs calculated as a percentage of direct costs from the hospital decision support system. Substantial differences between cost estimates using TDABC and TA were found for primary THA (USD 12,982 TDABC versus USD 23,915 TA), primary TKA (USD 13,661 TDABC versus USD 24,796 TA), and individually across all three surgeons for both (THA: TDABC = 49%-55% of TA total cost; TKA: TDABC = 53%-55% of TA total cost). Cost categories with the most variability between TA and TDABC estimates were operating room services and room and board. Traditional hospital cost accounting systems overestimate the costs associated with many surgical procedures, including primary TJA. TDABC provides a more accurate measure of true resource use associated with TJAs and can be used to identify high-cost/high-variability processes that can be targeted for process/quality improvement. Level III, therapeutic study.
Ascher-Svanum, Haya; Nyhuis, Allen W; Faries, Douglas E; Ball, Daniel E; Kinon, Bruce J
2010-01-28
Individuals with schizophrenia may have a higher risk of encounters with the criminal justice system than the general population, but there are limited data on such encounters and their attendant costs. This study assessed the prevalence of encounters with the criminal justice system, encounter types, and the estimated cost attributable to these encounters in the one-year treatment of persons with schizophrenia. This post-hoc analysis used data from a prospective one-year cost-effectiveness study of persons treated with antipsychotics for schizophrenia and related disorders in the United States. Criminal justice system involvement was assessed using the Schizophrenia Patients Outcome Research Team (PORT) client survey and the victimization subscale of the Lehman Quality of Life Interview (QOLI). Direct cost of criminal justice system involvement was estimated using previously reported costs per type of encounter. Patients with and without involvement were compared on baseline characteristics and direct annual health care and criminal justice system-related costs. Overall, 278 (46%) of 609 participants reported at least 1 criminal justice system encounter. They were more likely to be substance users and less adherent to antipsychotics compared to participants without involvement. The 2 most prevalent types of encounters were being a victim of a crime (67%) and being on parole or probation (26%). The mean annual per-patient cost of involvement was $1,429, translating to 6% of total annual direct health care costs for those with involvement (11% when excluding crime victims). Criminal justice system involvement appears to be prevalent and costly for persons treated for schizophrenia in the United States. Findings highlight the need to better understand the interface between the mental health and the criminal justice systems and the related costs, in personal, societal, and economic terms.
The cost of vision loss in Canada. 1. Methodology.
Gordon, Keith D; Cruess, Alan F; Bellan, Lorne; Mitchell, Scott; Pezzullo, M Lynne
2011-08-01
This paper outlines the methodology used to estimate the cost of vision loss in Canada. The results of this study will be presented in a second paper. The cost of vision loss (VL) in Canada was estimated using a prevalence-based approach. This was done by estimating the number of people with VL in a base period (2007) and the costs associated with treating them. The cost estimates included direct health system expenditures on eye conditions that cause VL, as well as other indirect financial costs such as productivity losses. Estimates were also made of the value of the loss of healthy life, measured in Disability Adjusted Life Years or DALY's. To estimate the number of cases of VL in the population, epidemiological data on prevalence rates were applied to population data. The number of cases of VL was stratified by gender, age, ethnicity, severity and cause. The following sources were used for estimating prevalence: Population-based eye studies; Canadian Surveys; Canadian journal articles and research studies; and International Population Based Eye Studies. Direct health costs were obtained primarily from Health Canada and Canadian Institute for Health Information (CIHI) sources, while costs associated with productivity losses were based on employment information compiled by Statistics Canada and on economic theory of productivity loss. Costs related to vision rehabilitation (VR) were obtained from Canadian VR organizations. This study shows that it is possible to estimate the costs for VL for a country in the absence of ongoing local epidemiological studies. Copyright © 2011 Canadian Ophthalmological Society. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shonder, J.A.
Geothermal heat pumps (GHPs) have been shown to have a number of benefits over other technologies used to heat and cool buildings and provide hot water, combining high levels of occupant comfort with low operating and maintenance costs. Public facilities represent an increasingly important market for GHPs, and schools are a particularly good application, given the large land area that normally surrounds them. Nevertheless, some barriers remain to the increased use of GHPs in institutional and commercial applications. First, because GHPs are perceived as having higher installation costs than other space conditioning technologies, they are sometimes not considered as anmore » option in feasibility studies. When they are considered, it can be difficult to compile the information required to compare them with other technologies. For example, a life cycle cost analysis requires estimates of installation costs and annually recurring energy and maintenance costs. But most cost estimators are unfamiliar with GHP technology, and no published GHP construction cost estimating guide is available. For this reason, estimates of installed costs tend to be very conservative, furthering the perception that GHPs are more costly than other technologies. Because GHP systems are not widely represented in the various softwares used by engineers to predict building energy use, it is also difficult to estimate the annual energy use of a building having GHP systems. Very little published data is available on expected maintenance costs either. Because of this lack of information, developing an accurate estimate of the life cycle cost of a GHP system requires experience and expertise that are not available in all institutions or in all areas of the country. In 1998, Oak Ridge National Laboratory (ORNL) entered into an agreement with the Lincoln, Nebraska, Public School District and Lincoln Electric Service, the local electric utility in the Lincoln area, to study four new, identical elementary schools built in the district that are served by GHPs. ORNL was provided with complete as-built construction plans for the schools and associated equipment, access to original design calculations and cost estimates, extensive equipment operating data [both from the buildings' energy management systems (EMSs) and from utility meters], and access to the school district's complete maintenance record database, not only for the four GHP schools, but for the other schools in the district using conventional space conditioning equipment. Using this information, we were able to reproduce the process used by the Lincoln school district and the consulting engineering firm to select GHPs over other options to provide space conditioning for the four schools. The objective was to determine whether this decision was the correct one, or whether some other technology would have been more cost-effective. An additional objective was to identify all of the factors that make it difficult for building owners and their engineers to consider GHPs in their projects so that ongoing programs can remove these impediments over time.« less
Development of a Carbon Management Geographic Information System (GIS) for the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howard Herzog; Holly Javedan
In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Costmore » Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.« less
Landfill Gas Energy Cost Model Version 3.0 (LFGcost-Web V3 ...
To help stakeholders estimate the costs of a landfill gas (LFG) energy project, in 2002, LMOP developed a cost tool (LFGcost). Since then, LMOP has routinely updated the tool to reflect changes in the LFG energy industry. Initially the model was designed for EPA to assist landfills in evaluating the economic and financial feasibility of LFG energy project development. In 2014, LMOP developed a public version of the model, LFGcost-Web (Version 3.0), to allow landfill and industry stakeholders to evaluate project feasibility on their own. LFGcost-Web can analyze costs for 12 energy recovery project types. These project costs can be estimated with or without the costs of a gas collection and control system (GCCS). The EPA used select equations from LFGcost-Web to estimate costs of the regulatory options in the 2015 proposed revisions to the MSW Landfills Standards of Performance (also known as New Source Performance Standards) and the Emission Guidelines (herein thereafter referred to collectively as the Landfill Rules). More specifically, equations derived from LFGcost-Web were applied to each landfill expected to be impacted by the Landfill Rules to estimate annualized installed capital costs and annual O&M costs of a gas collection and control system. In addition, after applying the LFGcost-Web equations to the list of landfills expected to require a GCCS in year 2025 as a result of the proposed Landfill Rules, the regulatory analysis evaluated whether electr
Poveda Andrés, J L; García Gómez, C; Hernández Sansalvador, M; Valladolid Walsh, A
2003-01-01
To determine monetary impact when traditional drug floor stocks are replaced by Automated Drug Dispensing Systems (ADDS) in the Medical Intensive Care Unit, Surgical Intensive Care Unit and the Emergency Room. We analysed four different flows considered to be determinant when implementing ADDS in a hospital environment: capital investment, staff costs, inventory costs and costs related to drug use policies. Costs were estimated by calculation of the current net value. Its analysis shows that those expenses derived from initial investment are compensated by the three remaining flows, with costs related to drug use policies showing the most substantial savings. Five years after initial investment, global cash-flows have been estimated at 300.525 euros. Replacement of traditional floor stocks by ADDS in the Medical Intensive Care Unit, Surgery Intensive Care Unit and the Emergency Room produces a positive benefit/cost ratio (1.95).
NASA Astrophysics Data System (ADS)
1981-09-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
NASA Technical Reports Server (NTRS)
1981-01-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
The health system cost of post-abortion care in Rwanda
Vlassoff, Michael; Musange, Sabine F; Kalisa, Ina R; Ngabo, Fidele; Sayinzoga, Felix; Singh, Susheela; Bankole, Akinrinola
2015-01-01
Based on research conducted in 2012, we estimate the cost to the Rwandan health-care system of providing post-abortion care (PAC) due to unsafe abortions, a subject of policy importance not studied before at the national level. Thirty-nine public and private health facilities representing three levels of health care were randomly selected for data collection from key care providers and administrators for all five regions. Using an ingredients approach to costing, data were gathered on drugs, supplies, material, personnel time and hospitalization. Additionally, direct non-medical costs such as overhead and capital costs were also measured. We found that the average annual PAC cost per client, across five types of abortion complications, was $93. The total cost of PAC nationally was estimated to be $1.7 million per year, 49% of which was expended on direct non-medical costs. Satisfying all demands for PAC would raise the national cost to $2.5 million per year. PAC comprises a significant share of total expenditure in reproductive health in Rwanda. Investing more resources in provision of contraceptive services to prevent unwanted or mistimed pregnancies would likely reduce health systems costs. PMID:24548846
Subramanian, Sujha; Hoover, Sonja; Wagner, Joann L; Donovan, Jennifer L; Kanaan, Abir O; Rochon, Paula A; Gurwitz, Jerry H; Field, Terry S
2012-01-01
In a randomized trial of a clinical decision support system for drug prescribing for residents with renal insufficiency in a large long-term care facility, analyses were conducted to estimate the system's immediate, direct financial impact. We determined the costs that would have been incurred if drug orders that triggered the alert system had actually been completed compared to the costs of the final submitted orders and then compared intervention units to control units. The costs incurred by additional laboratory testing that resulted from alerts were also estimated. Drug orders were conservatively assigned a duration of 30 days of use for a chronic drug and 10 days for antibiotics. It was determined that there were modest reductions in drug costs, partially offset by an increase in laboratory-related costs. Overall, there was a reduction in direct costs (US$1391.43, net 7.6% reduction). However, sensitivity analyses based on alternative estimates of duration of drug use suggested a reduction as high as US$7998.33 if orders for non-antibiotic drugs were assumed to be continued for 180 days. The authors conclude that the immediate and direct financial impact of a clinical decision support system for medication ordering for residents with renal insufficiency is modest and that the primary motivation for such efforts must be to improve the quality and safety of medication ordering.
The social cost of illegal drug consumption in Spain.
García-Altés, Anna; Ollé, Josep Ma; Antoñanzas, Fernando; Colom, Joan
2002-09-01
The objective of this study was to estimate the social cost of the consumption of illegal drugs in Spain. We performed a cost-of-illness study, using a prevalence approximation and a societal perspective. The estimation of costs and consequences referred to 1997. As direct costs we included health-care costs, prevention, continuing education, research, administrative costs, non-governmental organizations and crime-related costs. As indirect costs we included lost productivity associated with mortality and the hospitalization of patients. Estimation of intangible costs was not included. The minimum cost of illegal drug consumption in Spain is 88,800 million pesetas (PTA) (467 million dollars). Seventy-seven per cent of the costs correspond to direct costs. Of those, crime-related costs represent 18%, while the largest part corresponds to the health-care costs (50% of direct costs). From the perspective of the health-care system, the minimum cost of illegal drug consumption is 44,000 million PTA (231 million dollars). The cost of illegal drug consumption represents 0.07% of the Spanish GDP. This gross figure compares with 2250 million PTA (12.5 million dollars) invested in prevention programmes during the same year, and with 12,300 million PTA (68.3 million dollars) spent on specific programmes and resources for the drug addict population. Although there are limitations intrinsic in this type of study and the estimations obtained in the present analysis are likely to be an underestimate of the real cost of this condition, we estimate that illegal drug consumption costs the Spanish economy at least 0.2% of GDP.
The socio-economic burden of snakebite in Sri Lanka.
Kasturiratne, Anuradhani; Pathmeswaran, Arunasalam; Wickremasinghe, A Rajitha; Jayamanne, Shaluka F; Dawson, Andrew; Isbister, Geoff K; de Silva, Hithanadura Janaka; Lalloo, David G
2017-07-01
Snakebite is a major problem affecting the rural poor in many of the poorest countries in the tropics. However, the scale of the socio-economic burden has rarely been studied. We undertook a comprehensive assessment of the burden in Sri Lanka. Data from a representative nation-wide community based household survey were used to estimate the number of bites and deaths nationally, and household and out of pocket costs were derived from household questionnaires. Health system costs were obtained from hospital cost accounting systems and estimates of antivenom usage. DALYs lost to snakebite were estimated using standard approaches using disability weights for poisoning. 79% of victims suffered economic loss following a snakebite with a median out of pocket expenditure of $11.82 (IQR 2-28.57) and a median estimated loss of income of $28.57 and $33.21 for those in employment or self-employment, respectively. Family members also lost income to help care for patients. Estimated health system costs for Sri Lanka were $ 10,260,652 annually. The annual estimated total number of DALYS was 11,101 to 15,076 per year for envenoming following snakebite. Snakebite places a considerable economic burden on the households of victims in Sri Lanka, despite a health system which is accessible and free at the point of care. The disability burden is also considerable, similar to that of meningitis or dengue, although the relatively low case fatality rate and limited physical sequelae following bites by Sri Lankan snakes means that this burden may be less than in countries on the African continent.
NASA Technical Reports Server (NTRS)
1973-01-01
Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.
The benefits of transit in the United States : a review and analysis of benefit-cost studies.
DOT National Transportation Integrated Search
2015-07-01
This white paper presents the findings from a review and analysis of the available literature on benefit-cost (b-c) estimates of : existing U.S. transit systems. Following an inventory of the literature, the b-c estimates from each study were organiz...
Costs of the Smoking Cessation Program in Brazil
Mendes, Andréa Cristina Rosa; Toscano, Cristiana Maria; Barcellos, Rosilene Marques de Souza; Ribeiro, Alvaro Luis Pereira; Ritzel, Jonas Bohn; Cunha, Valéria de Souza; Duncan, Bruce Bartholow
2016-01-01
ABSTRACT OBJECTIVE To assess the costs of the Smoking Cessation Program in the Brazilian Unified Health System and estimate the cost of its full implementation in a Brazilian municipality. METHODS The intensive behavioral therapy and treatment for smoking cessation includes consultations, cognitive-behavioral group therapy sessions, and use of medicines. The costs of care and management of the program were estimated using micro-costing methods. The full implementation of the program in the municipality of Goiania, Goias was set as its expansion to meet the demand of all smokers motivated to quit in the municipality that would seek care at Brazilian Unified Health System. We considered direct medical and non-medical costs: human resources, medicines, consumables, general expenses, transport, travels, events, and capital costs. We included costs of federal, state, and municipal levels. The perspective of the analysis was that from the Brazilian Unified Health System. Sensitivity analysis was performed by varying parameters concerning the amount of activities and resources used. Data sources included a sample of primary care health units, municipal and state secretariats of health, and the Brazilian Ministry of Health. The costs were estimated in Brazilian Real (R$) for the year of 2010. RESULTS The cost of the program in Goiania was R$429,079, with 78.0% regarding behavioral therapy and treatment of smoking. The cost per patient was R$534, and, per quitter, R$1,435. The full implementation of the program in the municipality of Goiania would generate a cost of R$20.28 million to attend 35,323 smokers. CONCLUSIONS The Smoking Cessation Program has good performance in terms of cost per patient that quit smoking. In view of the burden of smoking in Brazil, the treatment for smoking cessation must be considered as a priority in allocating health resources. PMID:27849293
Pricing Medicare's diagnosis-related groups: Charges versus estimated costs
Price, Kurt F.
1989-01-01
Hospital payments under Medicare's prospective payment system (PPS) are based on prices established for 474 diagnosis-related groups (DRG's). Previous analyses using 1981 data demonstrated that DRG prices based on charges alone were not that different from prices calculated from estimated costs. Data for 1986 were used in this study to show that the differences between the two sets of DRG prices are much larger than previously reported. If DRG prices were once again based on estimated costs instead of the current charge-based prices, payments would be significantly redistributed. PMID:10313356
Orbital Spacecraft Consumables Resupply System (OSCRS). Volume 3: Program Cost Estimate
NASA Technical Reports Server (NTRS)
Perry, D. L.
1986-01-01
A cost analysis for the design, development, qualification, and production of the monopropellant and bipropellant Orbital Spacecraft Consumable Resupply System (OSCRS) tankers, their associated avionics located in the Orbiter payload bay, and the unique ground support equipment (GSE) and airborne support equipment (ASE) required to support operations is presented. Monopropellant resupply for the Gamma Ray Observatory (GRO) in calendar year 1991 is the first defined resupply mission with bipropellant resupply missions expected in the early to mid 1990's. The monopropellant program estimate also includes contractor costs associated with operations support through the first GRO resupply mission.
Lin, Chyongchiou Jeng; Nowalk, Mary Patricia; Zimmerman, Richard K
2012-02-01
Health care personnel (HCP) are an important target group for influenza vaccination because of their close contact with vulnerable patients. Annual influenza vaccination for HCP is recommended to reduce the spread of influenza and decrease staff illness and absenteeism. UPMC Health System, the largest health system in western Pennsylvania, established a quality improvement project to increase influenza vaccination among its > 50,000 employees by implementing survey-informed interventions. At the completion of the intervention, estimates were prepared of the costs associated with implementing a multifaceted quality improvement intervention to improve HCP influenza vaccination rates in a large multihospital health system. All 11 participating hospitals provided education and publicity regarding influenza vaccination and provided vaccine free of charge at mass vaccination clinics. Two additional strategies-mobile vaccination carts and incentives-were implemented in a factorial design such that the hospitals had either carts, incentives, both strategies, or neither. The minimum and maximum costs per vaccinated employee by type of intervention were estimated using cost data for vaccine/supplies, labor, incentives, and administration. The average costs per vaccinated employee ranged from $24.55 to $30.43 for incentives and carts, $20.66 to $25.57 for incentives, $23.24 to $26.54 for carts, and $18.03 to $20.60 for education and publicity only. Vaccination rates increased significantly but remained below ideal levels. Influenza vaccination rates among nonphysician HCP can be improved using various interventions at a low cost per vaccinated employee. The costs for these nonmandatory interventions were modest compared with the costs typically associated with influenza-related absenteeism.
Cost analysis of water recovery systems
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1973-01-01
A methodology was developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware based on an extrapolation of past hardware development experience. Major items of costs within water recovery systems were identified and related to physical and/or performance criteria. Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced water recovery systems. The results of the study are expected to assist NASA in long-range planning and allocation of resources in a cost effective manner in support of earth orbital programs. This report deals with the cost analysis of the five leading water reclamation systems, namely: (1) RITE waste management-water system, (2) reverse osmosis system, (3) multifiltration system, (4) vapor compression system, and (5) closed air evaporation system with electrolytic pretreatment.
Wilson, Nick; Kvizhinadze, Giorgi; Pega, Frank; Nair, Nisha; Blakely, Tony
2017-01-01
Background There is some evidence that home safety assessment and modification (HSAM) is effective in reducing falls in older people. But there are various knowledge gaps, including around cost-effectiveness and also the impacts at a health district-level. Methods and findings A previously established Markov macro-simulation model built for the whole New Zealand (NZ) population (Pega et al 2016, Injury Prevention) was enhanced and adapted to a health district level. This district was Counties Manukau District Health Board, which hosts 42,000 people aged 65+ years. A health system perspective was taken and a discount rate of 3% was used for both health gain and costs. Intervention effectiveness estimates came from a systematic review, and NZ-specific intervention costs were extracted from a randomized controlled trial. In the 65+ age-group in this health district, the HSAM program was estimated to achieve health gains of 2800 quality-adjusted life-years (QALYs; 95% uncertainty interval [UI]: 547 to 5280). The net health system cost was estimated at NZ$8.44 million (95% UI: $663 to $14.3 million). The incremental cost-effectiveness ratio (ICER) was estimated at NZ$5480 suggesting HSAM is cost-effective (95%UI: cost saving to NZ$15,300 [equivalent to US$10,300]). Targeting HSAM only to people age 65+ or 75+ with previous injurious falls was estimated to be particularly cost-effective (ICERs: $700 and $832, respectively) with the latter intervention being cost-saving. There was no evidence for differential cost-effectiveness by sex or by ethnicity: Māori (Indigenous population) vs non-Māori. Conclusions This modeling study suggests that a HSAM program could produce considerable health gain and be cost-effective for older people at a health district level. Nevertheless, comparisons may be desirable with other falls prevention interventions such as group exercise programs, which also provide social contact and may prevent various chronic diseases. PMID:28910342
Wilson, Nick; Kvizhinadze, Giorgi; Pega, Frank; Nair, Nisha; Blakely, Tony
2017-01-01
There is some evidence that home safety assessment and modification (HSAM) is effective in reducing falls in older people. But there are various knowledge gaps, including around cost-effectiveness and also the impacts at a health district-level. A previously established Markov macro-simulation model built for the whole New Zealand (NZ) population (Pega et al 2016, Injury Prevention) was enhanced and adapted to a health district level. This district was Counties Manukau District Health Board, which hosts 42,000 people aged 65+ years. A health system perspective was taken and a discount rate of 3% was used for both health gain and costs. Intervention effectiveness estimates came from a systematic review, and NZ-specific intervention costs were extracted from a randomized controlled trial. In the 65+ age-group in this health district, the HSAM program was estimated to achieve health gains of 2800 quality-adjusted life-years (QALYs; 95% uncertainty interval [UI]: 547 to 5280). The net health system cost was estimated at NZ$8.44 million (95% UI: $663 to $14.3 million). The incremental cost-effectiveness ratio (ICER) was estimated at NZ$5480 suggesting HSAM is cost-effective (95%UI: cost saving to NZ$15,300 [equivalent to US$10,300]). Targeting HSAM only to people age 65+ or 75+ with previous injurious falls was estimated to be particularly cost-effective (ICERs: $700 and $832, respectively) with the latter intervention being cost-saving. There was no evidence for differential cost-effectiveness by sex or by ethnicity: Māori (Indigenous population) vs non-Māori. This modeling study suggests that a HSAM program could produce considerable health gain and be cost-effective for older people at a health district level. Nevertheless, comparisons may be desirable with other falls prevention interventions such as group exercise programs, which also provide social contact and may prevent various chronic diseases.
48 CFR 215.407-5-70 - Disclosure, maintenance, and review requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management systems (e.g., production control or cost accounting) with the estimating system so that the... disposition of the survey team findings. (g) Impact of estimating system deficiencies on specific proposals... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES...
Cost estimates for flat plate and concentrator collector arrays
NASA Technical Reports Server (NTRS)
Shimada, K.
1982-01-01
The current module and installation costs for the U.S. National Photovoltaic Program's grid-connected systems are significantly higher than required for economic viability of this alternative. Attention is accordingly given to the prospects for installed module cost reductions in flat plate, linear focus Fresnel concentrator, and point focus Fresnel concentrator candidate systems. Cost projections indicate that all three systems would meet near-term and midterm goals, provided that module costs of $2.80/W(p) and $0.70/W(p), respectively, are met. The point focus Fresnel system emerges as the most viable for the near term.
Social Cost of Substance Abuse in Russia.
Potapchik, Elena; Popovich, Larisa
2014-09-01
To summarize results of studies that estimate the social costs of alcohol, tobacco, and illicit drug abuse in Russia. The purpose of these studies was to inform policymakers about the real economic burden of risky behaviors and to provide conditions for evidence-based and well-informed decision making in this area. The cost-of-illness method was applied to estimate the social cost of substance abuse. The intangible cost was not included in estimation. A prevalence-based approach was applied to estimate the tangible cost. For the estimation of direct costs, a top-down method was used. Indirect costs were estimated using two methods: the human capital and the friction cost. In 2008, the social cost of substance abuse in Russia comprised 677.2 billion rubles if the friction cost method is applied and 1965.9 billion rubles if the human capital method is used. The social cost of substance abuse is defined to the greatest extent by alcohol consumption, comprising about 45% of the economic burden. Illicit drug use comprises about 30% of the economic burden and tobacco consumption 25%. The results of economic studies demonstrated that psychoactive substances impose a considerable economic burden on society. Analysis of the substance abuse social cost pattern shows that the main losses that society bears because of these behavioral risk factors fall outside the health care system and lay in other sectors of the economy such as social care, law enforcement, and productivity losses. Copyright © 2014 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.
Grosse, Scott D.; Nelson, Richard E.; Nyarko, Kwame A.; Richardson, Lisa C.; Raskob, Gary E.
2015-01-01
Venous thromboembolism (VTE), which includes deep vein thrombosis and pulmonary embolism, is an important cause of preventable mortality and morbidity. In this study, we summarize estimates of per-patient and aggregate medical costs or expenditures attributable to incident VTE in the United States. Per-patient estimates of incremental costs can be calculated as the difference in costs between patients with and without an event after controlling for differences in underlying health status. We identified estimates of the incremental per-patient costs of acute VTEs and VTE-related complications, including recurrent VTE, post-thrombotic syndrome, chronic thromboembolic pulmonary hypertension, and anticoagulation-related adverse drug events. Based on the studies identified, treatment of an acute VTE on average appears to be associated with incremental direct medical costs of $12,000 to $15,000 (2014 US dollars) among first-year survivors, controlling for risk factors. Subsequent complications are conservatively estimated to increase cumulative costs to $18,000–23,000 per incident case. Annual incident VTE events conservatively cost the US healthcare system $7–10 billion each year for 375,000 to 425,000 newly diagnosed, medically treated incident VTE cases. Future studies should track long-term costs for cohorts of people with incident VTE, control for comorbid conditions that have been shown to be associated with VTE, and estimate incremental medical costs for people with VTE who do not survive. The costs associated with treating VTE can be used to assess the potential economic benefit and cost-savings from prevention efforts, although costs will vary among different patient groups. PMID:26654719
Grosse, Scott D; Nelson, Richard E; Nyarko, Kwame A; Richardson, Lisa C; Raskob, Gary E
2016-01-01
Venous thromboembolism (VTE), which includes deep vein thrombosis and pulmonary embolism, is an important cause of preventable mortality and morbidity. In this study, we summarize estimates of per-patient and aggregate medical costs or expenditures attributable to incident VTE in the United States. Per-patient estimates of incremental costs can be calculated as the difference in costs between patients with and without an event after controlling for differences in underlying health status. We identified estimates of the incremental per-patient costs of acute VTEs and VTE-related complications, including recurrent VTE, post-thrombotic syndrome, chronic thromboembolic pulmonary hypertension, and anticoagulation-related adverse drug events. Based on the studies identified, treatment of an acute VTE on average appears to be associated with incremental direct medical costs of $12,000 to $15,000 (2014 US dollars) among first-year survivors, controlling for risk factors. Subsequent complications are conservatively estimated to increase cumulative costs to $18,000-23,000 per incident case. Annual incident VTE events conservatively cost the US healthcare system $7-10 billion each year for 375,000 to 425,000 newly diagnosed, medically treated incident VTE cases. Future studies should track long-term costs for cohorts of people with incident VTE, control for comorbid conditions that have been shown to be associated with VTE, and estimate incremental medical costs for people with VTE who do not survive. The costs associated with treating VTE can be used to assess the potential economic benefit and cost-savings from prevention efforts, although costs will vary among different patient groups. Published by Elsevier Ltd.
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Volpe Center Report on Advanced Automation System Benefit-Cost Study: Final Report
DOT National Transportation Integrated Search
1993-10-25
The Volpe Center study of the benefits and costs of the AAS approached the analysis by segments rather than as a whole system. The study concentrated on the automation aspects of the A TC system and applied conservative assumptions to the estimation ...
A measurement system for large, complex software programs
NASA Technical Reports Server (NTRS)
Rone, Kyle Y.; Olson, Kitty M.; Davis, Nathan E.
1994-01-01
This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.
NASA Technical Reports Server (NTRS)
Maynard, O. E.; Brown, W. C.; Edwards, A.; Haley, J. T.; Meltz, G.; Howell, J. M.; Nathan, A.
1975-01-01
The microwave rectifier technology, approaches to the receiving antenna, topology of rectenna circuits, assembly and construction, ROM cost estimates are discussed. Analyses and cost estimates for the equipment required to transmit the ground power to an external user. Noise and harmonic considerations are presented for both the amplitron and klystron and interference limits are identified and evaluated. The risk assessment discussion is discussed wherein technology risks are rated and ranked with regard to their importance in impacting the microwave power transmission system. The system analyses and evaluation are included of parametric studies of system relationships pertaining to geometry, materials, specific cost, specific weight, efficiency, converter packing, frequency selection, power distribution, power density, power output magnitude, power source, transportation and assembly. Capital costs per kW and energy costs as a function of rate of return, power source and transportation costs as well as build cycle time are presented. The critical technology and ground test program are discussed along with ROM costs and schedule. The orbital test program with associated critical technology and ground based program based on full implementation of the defined objectives is discussed.
ABC estimation of unit costs for emergency department services.
Holmes, R L; Schroeder, R E
1996-04-01
Rapid evolution of the health care industry forces managers to make cost-effective decisions. Typical hospital cost accounting systems do not provide emergency department managers with the information needed, but emergency department settings are so complex and dynamic as to make the more accurate activity-based costing (ABC) system prohibitively expensive. Through judicious use of the available traditional cost accounting information and simple computer spreadsheets. managers may approximate the decision-guiding information that would result from the much more costly and time-consuming implementation of ABC.
Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1979-02-01
This report describes a new cost estimating system for tunneling. The system is designed so that it may be used to aid planners, engineers, and designers in evaluating the cost impact of decisions they may make during the sequential stages of plannin...
Leal, Jenine R; Heitman, Steven J; Conly, John M; Henderson, Elizabeth A; Manns, Braden J
2016-09-01
OBJECTIVE To conduct a full economic evaluation assessing the costs and consequences related to probiotic use for the primary prevention of Clostridium difficile-associated diarrhea (CDAD). DESIGN Cost-effectiveness analysis using decision analytic modeling. METHODS A cost-effectiveness analysis was used to evaluate the risk of CDAD and the costs of receiving oral probiotics versus not over a time horizon of 30 days. The target population modeled was all adult inpatients receiving any therapeutic course of antibiotics from a publicly funded healthcare system perspective. Effectiveness estimates were based on a recent systematic review of probiotics for the primary prevention of CDAD. Additional estimates came from local data and the literature. Sensitivity analyses were conducted to assess how plausible changes in variables impacted the results. RESULTS Treatment with oral probiotics led to direct costs of CDN $24 per course of treatment per patient. On average, patients treated with oral probiotics had a lower overall cost compared with usual care (CDN $327 vs $845). The risk of CDAD was reduced from 5.5% in those not receiving oral probiotics to 2% in those receiving oral probiotics. These results were robust to plausible variation in all estimates. CONCLUSIONS Oral probiotics as a preventive strategy for CDAD resulted in a lower risk of CDAD as well as cost-savings. The cost-savings may be greater in other healthcare systems that experience a higher incidence and cost associated with CDAD. Infect Control Hosp Epidemiol 2016;37:1079-1086.
Novaes, Hillegonda Maria Dutilh; de Soárez, Patrícia Coelho; Silva, Gulnar Azevedo; Ayres, Andreia; Itria, Alexander; Rama, Cristina Helena; Sartori, Ana Marli Christovam; Clark, Andrew D; Resch, Stephen
2015-05-07
To evaluate the impact and cost-effectiveness of introducing universal human papillomavirus (HPV) vaccination into the National Immunization Program (NIP) in Brazil. The Excel-based CERVIVAC decision support model was used to compare two strategies: (1) status quo (with current screening program) and (2) vaccination of a cohort of 11-year-old girls. National parameters for the epidemiology and costs of cervical cancer were estimated in depth. The estimates were based on data from the health information systems of the public health system, the PNAD 2008 national household survey, and relevant scientific literature on Brazil. Costs are expressed in 2008 United States dollars (US$), and a 5% discount rate is applied to both future costs and future health benefits. Introducing the HPV vaccine would reduce the burden of disease. The model estimated there would be 229 deaths avoided and 6677 disability-adjusted life years (DALYs) averted in the vaccinated cohort. The incremental cost-effectiveness ratios (ICERs) per DALY averted from the perspectives of the government (US$ 7663), health system (US$ 7412), and society (US$ 7298) would be considered cost-effective, according to the parameters adopted by the World Health Organization. In the sensitivity analysis, the ICERs were most sensitive to variations in discount rate, disease burden, vaccine efficacy, and proportion of cervical cancer caused by types 16 and 18. However, universal HPV vaccination remained a cost-effective strategy in most variations of the key estimates. Vaccine introduction could contribute additional benefits in controlling cervical cancer, but it requires large investments by the NIP. Among the essential conditions for attaining the expected favorable results are immunization program sustainability, equity in a population perspective, improvement of the screening program, and development of a surveillance system. Copyright © 2014 Elsevier Ltd. All rights reserved.
[A cost-benefit analysis of occupational disease reporting in China].
Tang, X Z; Zeng, Q; Liu, D S
2017-03-20
Objective: To perform a cost-benefit analysis of the occupational disease reporting system in China, and to provide a basis for effective resource allocation. Methods: The data on the cost of occupational diseases were collected from China Health Statistics Yearbook 2013, the estimated benefit data were collected from published articles in China and foreign countries, and the probability data were collected from the occupational diseasereports published by health and family planning administrative departments. Adecision-making tree was used for the cost-benefit analysis. Results: The estimated cost of occupational disease reporting was about 102.47 million yuan/year, consisting of a cost of reporting in national medical institutions of 1.25 million yuan/year, a management cost of 30.35 million yuan/year, a management cost in local public health institutions of 69.80 million yuan/year, a management cost in national public health institutions of 370 thousand yuan/year, and a cost of construction and maintenance of reporting system of 700 thousand yuan/year. The results of the decision tree analysis showed that when an occupational disease monitoring system was established, the incremental input for occupational disease monitoring and prevention/control was 2.1 billion yuan/year, the output was 6.5 billion yuan/year, and the benefit of occupational disease reporting system was 4.4 billion yuan/year. Conclusion: The benefit of occupational disease reporting system depends on the cost-benefit of occupational disease prevention and control measures, and proper prevention and control measures are extremely important for improving the benefit of occupational disease reporting system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
James, Brian David; Huya-Kouadio, Jennie Moton; Houchins, Cassidy
This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.
Software for Tracking Costs of Mars Projects
NASA Technical Reports Server (NTRS)
Wong, Alvin; Warfield, Keith
2003-01-01
The Mars Cost Tracking Model is a computer program that administers a system set up for tracking the costs of future NASA projects that pertain to Mars. Previously, no such tracking system existed, and documentation was written in a variety of formats and scattered in various places. It was difficult to justify costs or even track the history of costs of a spacecraft mission to Mars. The present software enables users to maintain all cost-model definitions, documentation, and justifications of cost estimates in one computer system that is accessible via the Internet. The software provides sign-off safeguards to ensure the reliability of information entered into the system. This system may eventually be used to track the costs of projects other than only those that pertain to Mars.
Economic implications of current systems
NASA Technical Reports Server (NTRS)
Daniel, R. E.; Aster, R. W.
1983-01-01
The primary goals of this study are to estimate the value of R&D to photovoltaic (PV) metallization systems cost, and to provide a method for selecting an optimal metallization method for any given PV system. The value-added cost and relative electrical performance of 25 state-of-the-art (SOA) and advanced metallization system techniques are compared.
Russo, S; Mariani, T T; Migliorini, R; Marcellusi, A; Mennini, F S
2015-09-16
The aim of the study is to estimate the pension costs incurred for patients with musculoskeletal disorders (MDs) and specifically with rheumatoid arthritis (RA) and ankylosing spondylitis (AS) in Italy between 2009 and 2012. We analyzed the database of the Italian National Social Security Institute (Istituto Nazionale Previdenza Sociale i.e. INPS) to estimate the total costs of three types of social security benefits granted to patients with MDs, RA and AS: disability benefits (for people with reduced working ability), disability pensions (for people who cannot qualify as workers) and incapacity pensions (for people without working ability). We developed a probabilistic model with a Monte Carlo simulation to estimate the total costs for each type of benefit associated with MDs, RA and AS. We also estimated the productivity loss resulting from RA in 2013. From 2009 to 2012 about 393 thousand treatments were paid for a total of approximately €2.7 billion. The annual number of treatments was on average 98 thousand and cost in total €674 million per year. In particular, the total pension burden was about €99 million for RA and €26 million for AS. The productivity loss for AR in 2013 was equal to €707,425,191 due to 9,174,221 working days lost. Our study is the fi rst to estimate the burden of social security pensions for MDs based on data of both approved claims and benefits paid by the national security system. From 2009 to 2012, in Italy, the highest indirect costs were associated with disability pensions (54% of the total indirect cost), followed by disability benefits (44.1% of cost) and incapacity pensions (1.8% of cost). In conclusion, MDs are chronic and highly debilitating diseases with a strong female predominance and very significant economic and social costs that are set to increase due to the aging of the population.
Solar power satellite system definition study, phase 2. Volume 2: Reference system description
NASA Technical Reports Server (NTRS)
1979-01-01
System descriptions and cost estimates for the reference system of the solar power satellite program are presented. The reference system is divided into five principal elements: the solar power satellites; space construction and support; space and ground transportation; ground receiving stations; and operations control. The program scenario and non-recurring costs are briefly described.
Estimation of spatial-temporal gait parameters using a low-cost ultrasonic motion analysis system.
Qi, Yongbin; Soh, Cheong Boon; Gunawan, Erry; Low, Kay-Soon; Thomas, Rijil
2014-08-20
In this paper, a low-cost motion analysis system using a wireless ultrasonic sensor network is proposed and investigated. A methodology has been developed to extract spatial-temporal gait parameters including stride length, stride duration, stride velocity, stride cadence, and stride symmetry from 3D foot displacements estimated by the combination of spherical positioning technique and unscented Kalman filter. The performance of this system is validated against a camera-based system in the laboratory with 10 healthy volunteers. Numerical results show the feasibility of the proposed system with average error of 2.7% for all the estimated gait parameters. The influence of walking speed on the measurement accuracy of proposed system is also evaluated. Statistical analysis demonstrates its capability of being used as a gait assessment tool for some medical applications.
Deep space network software cost estimation model
NASA Technical Reports Server (NTRS)
Tausworthe, R. C.
1981-01-01
A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.
U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maples, B.
2012-10-01
With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOSmore » model, an analysis to understand the non‐turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.« less
Benefit-cost estimation for alternative drinking water maximum contaminant levels
NASA Astrophysics Data System (ADS)
Gurian, Patrick L.; Small, Mitchell J.; Lockwood, John R.; Schervish, Mark J.
2001-08-01
A simulation model for estimating compliance behavior and resulting costs at U.S. Community Water Suppliers is developed and applied to the evaluation of a more stringent maximum contaminant level (MCL) for arsenic. Probability distributions of source water arsenic concentrations are simulated using a statistical model conditioned on system location (state) and source water type (surface water or groundwater). This model is fit to two recent national surveys of source waters, then applied with the model explanatory variables for the population of U.S. Community Water Suppliers. Existing treatment types and arsenic removal efficiencies are also simulated. Utilities with finished water arsenic concentrations above the proposed MCL are assumed to select the least cost option compatible with their existing treatment from among 21 available compliance strategies and processes for meeting the standard. Estimated costs and arsenic exposure reductions at individual suppliers are aggregated to estimate the national compliance cost, arsenic exposure reduction, and resulting bladder cancer risk reduction. Uncertainties in the estimates are characterized based on uncertainties in the occurrence model parameters, existing treatment types, treatment removal efficiencies, costs, and the bladder cancer dose-response function for arsenic.
NASA Astrophysics Data System (ADS)
Khader, A. I.; Rosenberg, D. E.; McKee, M.
2013-05-01
Groundwater contaminated with nitrate poses a serious health risk to infants when this contaminated water is used for culinary purposes. To avoid this health risk, people need to know whether their culinary water is contaminated or not. Therefore, there is a need to design an effective groundwater monitoring network, acquire information on groundwater conditions, and use acquired information to inform management options. These actions require time, money, and effort. This paper presents a method to estimate the value of information (VOI) provided by a groundwater quality monitoring network located in an aquifer whose water poses a spatially heterogeneous and uncertain health risk. A decision tree model describes the structure of the decision alternatives facing the decision-maker and the expected outcomes from these alternatives. The alternatives include (i) ignore the health risk of nitrate-contaminated water, (ii) switch to alternative water sources such as bottled water, or (iii) implement a previously designed groundwater quality monitoring network that takes into account uncertainties in aquifer properties, contaminant transport processes, and climate (Khader, 2012). The VOI is estimated as the difference between the expected costs of implementing the monitoring network and the lowest-cost uninformed alternative. We illustrate the method for the Eocene Aquifer, West Bank, Palestine, where methemoglobinemia (blue baby syndrome) is the main health problem associated with the principal contaminant nitrate. The expected cost of each alternative is estimated as the weighted sum of the costs and probabilities (likelihoods) associated with the uncertain outcomes resulting from the alternative. Uncertain outcomes include actual nitrate concentrations in the aquifer, concentrations reported by the monitoring system, whether people abide by manager recommendations to use/not use aquifer water, and whether people get sick from drinking contaminated water. Outcome costs include healthcare for methemoglobinemia, purchase of bottled water, and installation and maintenance of the groundwater monitoring system. At current methemoglobinemia and bottled water costs of 150/person and 0.6/baby/day, the decision tree results show that the expected cost of establishing the proposed groundwater quality monitoring network exceeds the expected costs of the uninformed alternatives and there is no value to the information the monitoring system provides. However, the monitoring system will be preferred to ignoring the health risk or using alternative sources if the methemoglobinemia cost rises to 300/person or the bottled water cost increases to 2.3/baby/day. Similarly, the monitoring system has value if the system can more accurately report actual aquifer concentrations and the public more fully abides by manager recommendations to use/not use the aquifer. The system also has value if it will serve a larger population or if its installation costs can be reduced, for example using a smaller number of monitoring wells. The VOI analysis shows how monitoring system design, accuracy, installation and operating costs, public awareness of health risks, costs of alternatives, and demographics together affect the value of implementing a system to monitor groundwater quality.
NASA Astrophysics Data System (ADS)
Khader, A.; Rosenberg, D.; McKee, M.
2012-12-01
Nitrate pollution poses a health risk for infants whose freshwater drinking source is groundwater. This risk creates a need to design an effective groundwater monitoring network, acquire information on groundwater conditions, and use acquired information to inform management. These actions require time, money, and effort. This paper presents a method to estimate the value of information (VOI) provided by a groundwater quality monitoring network located in an aquifer whose water poses a spatially heterogeneous and uncertain health risk. A decision tree model describes the structure of the decision alternatives facing the decision maker and the expected outcomes from these alternatives. The alternatives include: (i) ignore the health risk of nitrate contaminated water, (ii) switch to alternative water sources such as bottled water, or (iii) implement a previously designed groundwater quality monitoring network that takes into account uncertainties in aquifer properties, pollution transport processes, and climate (Khader and McKee, 2012). The VOI is estimated as the difference between the expected costs of implementing the monitoring network and the lowest-cost uninformed alternative. We illustrate the method for the Eocene Aquifer, West Bank, Palestine where methemoglobinemia is the main health problem associated with the principal pollutant nitrate. The expected cost of each alternative is estimated as the weighted sum of the costs and probabilities (likelihoods) associated with the uncertain outcomes resulting from the alternative. Uncertain outcomes include actual nitrate concentrations in the aquifer, concentrations reported by the monitoring system, whether people abide by manager recommendations to use/not-use aquifer water, and whether people get sick from drinking contaminated water. Outcome costs include healthcare for methemoglobinemia, purchase of bottled water, and installation and maintenance of the groundwater monitoring system. At current methemoglobinemia and bottled water costs of 150 $/person and 0.6 $/baby/day, the decision tree results show that the expected cost of establishing the proposed groundwater quality monitoring network exceeds the expected costs of the uninformed alternatives and there is not value to the information the monitoring system provides. However, the monitoring system will be preferred to ignoring the health risk or using alternative sources if the methemoglobinemia cost rises to 300 $/person or the bottled water cost increases to 2.3 $/baby/day. Similarly, the monitoring system has value if the system can more accurately report actual aquifer concentrations and the public more fully abides by managers' recommendations to use/not use the aquifer. The system also has value if it will serve a larger population or if its installation costs can be reduced, for example using a smaller number of monitoring wells. The VOI analysis shows how monitoring system design, accuracy, installation and operating costs, public awareness of health risks, costs of alternatives, and demographics together affect the value of implementing a system to monitor groundwater quality.
Duerinckx, A J; Kenagy, J J; Grant, E G
1998-01-01
This study analysed the design and cost of a picture archiving and communications system (PACS), computerized radiography (CR) and a wide-area network for teleradiology. The Desert Pacific Healthcare Network comprises 10 facilities, including four tertiary medical centres and one small hospital. Data were collected on radiologists' workloads, and patient and image flow within and between these medical centres. These were used to estimate the size and cash flows associated with a system-wide implementation of PACS, CR and teleradiology services. A cost analysis model was used to estimate the potential cost savings in a filmless radiology environment. ATM technology was selected as the communications medium between the medical centres. A strategic plan and business plan were successfully developed. The cost model predicted the cost-effectiveness of the proposed PACS/CR configuration within four to six years, if the base costs were kept low. The experience gained in design and cost analysis of a PACS/teleradiology network will serve as a model for similar projects.
NASA Technical Reports Server (NTRS)
Gates, W. R.
1983-01-01
Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.
NASA Astrophysics Data System (ADS)
Gates, W. R.
1983-02-01
Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.
DOD/NASA system impact analysis (study 2.1). Volume 2: Study results
NASA Technical Reports Server (NTRS)
1973-01-01
Results of the tug turnaround cost study and the space transportation system (STS) abort modes and effects study are presented for DOD/NASA system impact analysis. Cost estimates are given for tug turnabout; and vehicle description, abort assessment, and abort performance capability are given for the STS.
USDA-ARS?s Scientific Manuscript database
The overall objective of this research was to develop an in-field presorting and grading system to separate undersized and defective fruit from fresh market-grade apples. To achieve this goal, a cost-effective machine vision inspection prototype was built, which consisted of a low-cost color camera,...
The Pilot Training Study: A Cost-Estimating Model for Undergraduate Pilot Training.
ERIC Educational Resources Information Center
Allison, S. L.
A means for estimating the resource requirements and attendant costs of any configuration of the undergraduate pilot training system (UPT) is described by inputs that are supplied by the user of the model. The inputs consist of data such as UPT graduate requirements, course syllabus requirements, instructor-student ratios, administrative and…
An Exploratory Study of Software Cost Estimating at the Electronic Systems Division.
1976-07-01
action’. to improve the software cost Sestimating proces., While thin research was limited to the M.nD onvironment, the same types of problema may exist...Methods in Social Science. Now York: Random House, 1969. 57. Smith, Ronald L. Structured Programming Series (Vol. XI) - Estimating Software Project
Direct and Indirect Costs of Asthma Management in Greece: An Expert Panel Approach.
Souliotis, Kyriakos; Kousoulakou, Hara; Hillas, Georgios; Bakakos, Petros; Toumbis, Michalis; Loukides, Stelios; Vassilakopoulos, Theodoros
2017-01-01
Asthma is a major cause of morbidity and mortality and is associated with significant economic burden worldwide. The objectives of this study were to map current resource use associated with the disease management and to estimate the annual direct and indirect costs per adult patient with asthma. A Delphi panel with seven leading pulmonologists was conducted. A semistructured questionnaire was developed to elicit data on resource use and treatment patterns. Unit costs from official, published sources were subsequently assigned to resource use to estimate direct medical costs. Indirect costs were estimated as number of work loss days. Cost base year was 2015, and the perspective adopted was that of the National Organization of Health Care Services Provision, as well as the societal. Patients with asthma are mainly managed by pulmonologists (71.4%) and secondarily by general practitioners and internists (28.6%). The annual cost of managing exacerbations was estimated at €273.1, while maintenance costs were estimated at €1,100.2 per year. Total costs of managing asthma per patient per year were estimated at €2,281.8, 64.4% of which represented direct medical costs. Of the direct costs, pharmaceutical treatment was the key driver, accounting for 63.9 and 41.2% of direct and total costs, respectively. Direct non-medical costs (patient travel and waiting time) were estimated at €152.3. Indirect costs accounted for 28.9% of total costs. Asthma is a chronic condition, the management of which constrains the already limited Greek health care resources. The increasing prevalence of the disease raises concerns as it could translate per patient costs into a significant burden for the Greek health care system. Thus, the prevention, self-management, and improved quality of care for asthma should find a place in the health policy agenda in Greece.
Wunsch, Eva-Maria; Kliem, Sören; Kröger, Christoph
2014-09-01
Borderline personality disorder (BPD) is considered one of the most expensive mental disorders in terms of direct and indirect costs. The aim of this study was to carry out a cost-offset estimation of disorder-specific psychotherapy for BPD at the population level. The study investigated whether the possible financial benefits of dialectical behavior therapy outweigh the therapy costs, assuming a currently running, ideal health system, and whether the estimated cost-benefit relationships change depending upon the number of patients willing to be treated. A formula was elaborated that allows the user to calculate cost-benefit relationships for various conservative or progressive scenarios, with different stages of individuals' willingness to be treated (10%-90%). The possible costs and benefits of BPD-related treatment were evaluated using a 12-month, prevalence-based approach. The annual costs for untreated BPD were 8.69 billion EUR annually. The cost-benefit relationship for the treatment remained constant at 1.52 for all scenarios, implying that for each EUR invested, 1.52 EUR can be gained within one year, independent of the willingness to be treated. Additional intangible benefits were calculated with the aid of Quality-Adjusted Life Years. Findings suggest that BPD-related treatment might well be efficient at the population level. Copyright © 2014 Elsevier Ltd. All rights reserved.
Cost analysis of new and retrofit hot-air type solar assisted heating systems
NASA Technical Reports Server (NTRS)
Stewart, R. D.; Hawkins, B. J.
1978-01-01
A detailed cost analysis/cost improvement study was performed on two Department of Energy/National Aeronautics and Space Administration operational test sites to determine actual costs and potential cost improvements of new and retrofit hot air type, solar assisted heating and hot water systems for single family sized structures. This analysis concentrated on the first cost of a system which included procurement, installation, and integration of a solar assisted heating and hot water system on a new or retrofit basis; it also provided several cost projections which can be used as inputs to payback analyses, depending upon the degree of optimism or future improvements assumed. Cost definitions were developed for five categories of cost, and preliminary estimates were developed for each. The costing methodology, approach, and results together with several candidate low cost designs are described.
Effect of prospective reimbursement on nursing home costs.
Coburn, A F; Fortinsky, R; McGuire, C; McDonald, T P
1993-01-01
OBJECTIVE. This study evaluates the effect of Maine's Medicaid nursing home prospective payment system on nursing home costs and access to care for public patients. DATA SOURCES/STUDY SETTING. The implementation of a facility-specific prospective payment system for nursing homes provided the opportunity for longitudinal study of the effect of that system. Data sources included audited Medicaid nursing home cost reports, quality-of-care data from state facility survey and licensure files, and facility case-mix information from random, stratified samples of homes and residents. Data were obtained for six years (1979-1985) covering the three-year period before and after implementation of the prospective payment system. STUDY DESIGN. This study used a pre-post, longitudinal analytical design in which interrupted, time-series regression models were estimated to test the effects of prospective payment and other factors, e.g., facility characteristics, nursing home market factors, facility case mix, and quality of care, on nursing home costs. PRINCIPAL FINDINGS. Prospective payment contributed to an estimated $3.03 decrease in total variable costs in the third year from what would have been expected under the previous retrospective cost-based payment system. Responsiveness to payment system efficiency incentives declined over the study period, however, indicating a growing problem in achieving further cost reductions. Some evidence suggested that cost reductions might have reduced access for public patients. CONCLUSIONS. Study findings are consistent with the results of other studies that have demonstrated the effectiveness of prospective payment systems in restraining nursing home costs. Potential policy trade-offs among cost containment, access, and quality assurance deserve further consideration, particularly by researchers and policymakers designing the new generation of case mix-based and other nursing home payment systems. PMID:8463109
Effect of prospective reimbursement on nursing home costs.
Coburn, A F; Fortinsky, R; McGuire, C; McDonald, T P
1993-04-01
This study evaluates the effect of Maine's Medicaid nursing home prospective payment system on nursing home costs and access to care for public patients. The implementation of a facility-specific prospective payment system for nursing homes provided the opportunity for longitudinal study of the effect of that system. Data sources included audited Medicaid nursing home cost reports, quality-of-care data from state facility survey and licensure files, and facility case-mix information from random, stratified samples of homes and residents. Data were obtained for six years (1979-1985) covering the three-year period before and after implementation of the prospective payment system. This study used a pre-post, longitudinal analytical design in which interrupted, time-series regression models were estimated to test the effects of prospective payment and other factors, e.g., facility characteristics, nursing home market factors, facility case mix, and quality of care, on nursing home costs. Prospective payment contributed to an estimated $3.03 decrease in total variable costs in the third year from what would have been expected under the previous retrospective cost-based payment system. Responsiveness to payment system efficiency incentives declined over the study period, however, indicating a growing problem in achieving further cost reductions. Some evidence suggested that cost reductions might have reduced access for public patients. Study findings are consistent with the results of other studies that have demonstrated the effectiveness of prospective payment systems in restraining nursing home costs. Potential policy trade-offs among cost containment, access, and quality assurance deserve further consideration, particularly by researchers and policymakers designing the new generation of case mix-based and other nursing home payment systems.
State-level estimates of obesity-attributable costs of absenteeism.
Andreyeva, Tatiana; Luedicke, Joerg; Wang, Y Claire
2014-11-01
To provide state-level estimates of obesity-attributable costs of absenteeism among working adults in the United States. Nationally representative data from the National Health and Nutrition Examination Survey for 1998 to 2008 and from the Behavioral Risk Factor Surveillance System for 2012 are examined. The outcome is obesity-attributable workdays missed in the previous year because of health and their costs to states. Obesity, but not overweight, is associated with a significant increase in workdays absent, from 1.1 to 1.7 extra days missed annually compared with normal-weight employees. Obesity-attributable absenteeism among American workers costs the nation an estimated $8.65 billion per year. Obesity imposes a considerable financial burden on states, accounting for 6.5% to 12.6% of total absenteeism costs in the workplace. State legislatures and employers should seek effective ways to reduce these costs.
Knowlton, Kim; Rotkin-Ellman, Miriam; Geballe, Linda; Max, Wendy; Solomon, Gina M
2011-11-01
The future health costs associated with predicted climate change-related events such as hurricanes, heat waves, and floods are projected to be enormous. This article estimates the health costs associated with six climate change-related events that struck the United States between 2000 and 2009. The six case studies came from categories of climate change-related events projected to worsen with continued global warming-ozone pollution, heat waves, hurricanes, infectious disease outbreaks, river flooding, and wildfires. We estimate that the health costs exceeded $14 billion, with 95 percent due to the value of lives lost prematurely. Actual health care costs were an estimated $740 million. This reflects more than 760,000 encounters with the health care system. Our analysis provides scientists and policy makers with a methodology to use in estimating future health costs related to climate change and highlights the growing need for public health preparedness.
NASA Technical Reports Server (NTRS)
Foster, Richard W.
1992-01-01
Extensively axisymmetric and non-axisymmetric Single Stage To Orbit (SSTO) vehicles are considered. The information is presented in viewgraph form and the following topics are presented: payload comparisons; payload as a percent of dry weight - a system hardware cost indicator; life cycle cost estimations; operations and support costs estimation; selected engine type; and rocket engine specific impulse calculation.
Cost of abortions in Zambia: A comparison of safe abortion and post abortion care.
Parmar, Divya; Leone, Tiziana; Coast, Ernestina; Murray, Susan Fairley; Hukin, Eleanor; Vwalika, Bellington
2017-02-01
Unsafe abortion is a significant but preventable cause of maternal mortality. Although induced abortion has been legal in Zambia since 1972, many women still face logistical, financial, social, and legal obstacles to access safe abortion services, and undergo unsafe abortion instead. This study provides the first estimates of costs of post abortion care (PAC) after an unsafe abortion and the cost of safe abortion in Zambia. In the absence of routinely collected data on abortions, we used multiple data sources: key informant interviews, medical records and hospital logbooks. We estimated the costs of providing safe abortion and PAC services at the University Teaching Hospital, Lusaka and then projected these costs to generate indicative cost estimates for Zambia. Due to unavailability of data on the actual number of safe abortions and PAC cases in Zambia, we used estimates from previous studies and from other similar countries, and checked the robustness of our estimates with sensitivity analyses. We found that PAC following an unsafe abortion can cost 2.5 times more than safe abortion care. The Zambian health system could save as much as US$0.4 million annually if those women currently treated for an unsafe abortion instead had a safe abortion.
Estimating the Cost of Providing Foundational Public Health Services.
Mamaril, Cezar Brian C; Mays, Glen P; Branham, Douglas Keith; Bekemeier, Betty; Marlowe, Justin; Timsina, Lava
2017-12-28
To estimate the cost of resources required to implement a set of Foundational Public Health Services (FPHS) as recommended by the Institute of Medicine. A stochastic simulation model was used to generate probability distributions of input and output costs across 11 FPHS domains. We used an implementation attainment scale to estimate costs of fully implementing FPHS. We use data collected from a diverse cohort of 19 public health agencies located in three states that implemented the FPHS cost estimation methodology in their agencies during 2014-2015. The average agency incurred costs of $48 per capita implementing FPHS at their current attainment levels with a coefficient of variation (CV) of 16 percent. Achieving full FPHS implementation would require $82 per capita (CV=19 percent), indicating an estimated resource gap of $34 per capita. Substantial variation in costs exists across communities in resources currently devoted to implementing FPHS, with even larger variation in resources needed for full attainment. Reducing geographic inequities in FPHS may require novel financing mechanisms and delivery models that allow health agencies to have robust roles within the health system and realize a minimum package of public health services for the nation. © Health Research and Educational Trust.
The price momentum of stock in distribution
NASA Astrophysics Data System (ADS)
Liu, Haijun; Wang, Longfei
2018-02-01
In this paper, a new momentum of stock in distribution is proposed and applied in real investment. Firstly, assuming that a stock behaves as a multi-particle system, its share-exchange distribution and cost distribution are introduced. Secondly, an estimation of the share-exchange distribution is given with daily transaction data by 3 σ rule from the normal distribution. Meanwhile, an iterative method is given to estimate the cost distribution. Based on the cost distribution, a new momentum is proposed for stock system. Thirdly, an empirical test is given to compare the new momentum with others by contrarian strategy. The result shows that the new one outperforms others in many places. Furthermore, entropy of stock is introduced according to its cost distribution.
Siregar, Adiatma Y M; Pitriyan, Pipit; Walters, Dylan
2018-01-01
In Indonesia, 96% of children (< 24mo) are breastfed. However, only 42% of children (< 6mo) are exclusively breastfed, as per World Health Organization recommendations. Breastfeeding provides protective benefits such as reducing the risk of morbidity and mortality associated with diarrhea and pneumonia/respiratory disease (PRD). This study estimates the potential economic impact of not breastfeeding according to recommendation in Indonesia based on infants suffering from attributable diarrhea and PRD. A cost analysis examined both the healthcare system costs and non-medical costs for children (< 24mo) with diarrhea and PRD. Data collection took place between 2015 and 2016 and healthcare expenditures were assessed in 13 facilities, in five sites including Bandung and Tomohon City. Costs from a provider perspective were estimated using healthcare records and 26 interviews with healthcare workers. A discount rate of 3% was used. A cross-sectional survey with caregiver-child pairs ( n = 615) collected data related to out of pocket costs such transportation and opportunity costs such as wage loss. These figures were combined with the national disease prevalence rates from Indonesia Demographic and Health Survey 2012, and the relative risk of disease of not breastfeeding according to recommendation from literatures to extrapolate the financial burden of treatment. The healthcare system cost due to not breastfeeding according to recommendation was estimated at US$118 million annually. The mean healthcare system cost and out of pocket costs was US$11.37 and US$3.85 respectively. This cost consists of US$88.64 million of provider costs and US$29.98 million of non-medical patient costs. The cost of not breastfeeding according to recommendation is potentially high, therefore the Indonesian government needs to invest in breastfeeding protection, promotion and support as the potential healthcare system cost savings are significant. As suggested by other studies, the long term cost due to cognitive losses of providing not breastfeeding according to recommendation should also be taken into account to provide a complete understanding of the economic impact of not breastfeeding according to recommendation.
Civil Uses of Remotely Piloted Aircraft
NASA Technical Reports Server (NTRS)
Aderhold, J. R.; Gordon, G.; Scott, G. W.
1976-01-01
The economic, technical, and environmental implications of remotely piloted vehicles (RVP) are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RVP systems is estimated. Typical cost savings of 25 to 35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.
Merrill, Steve J; Paz, Alexander; Molano, Victor; Shrestha, Pramen P; Maheshwari, Pankaj; Stephen, Haroon; de la Fuente-Mella, Hanns
2016-01-01
This study provides an economic evaluation for a Land Ferry, which is a rail system capable of carrying trucks and all other types of vehicles, passengers, and cargo. The Land Ferry system involves a sliding loading system to roll heavy loads onto a flatbed; as a result, loading and unloading of all vehicles and cargo could be accomplished simultaneously. The evaluation for this system included (1) the design of a new track alignment over which the Land Ferry system would run, (2) evaluation of various sources of power, (3) estimation of how many local jobs the Land Ferry would generate, and (4) a benefit-cost analysis. It was estimated that the Land Ferry would create over 45,788 temporary jobs in Nevada during the three-year construction period and 318 permanent jobs during operation. The majority of the benefits were attributed to savings in travel time ($356.4 M), vehicle operating costs ($1000.4 M), reduction of accidents ($544.6 M), and pavement maintenance ($503.2 M). These benefits would be a consequence of the shift of trucks from the highway, thus resulting in higher speeds, decrease fuel consumption, and decrease vehicle maintenance costs. The overall benefit-cost ratio of 1.7 implies a cost-effective project.
Merrill, Steve J.; Paz, Alexander; Molano, Victor; Shrestha, Pramen P.; Maheshwari, Pankaj; Stephen, Haroon
2016-01-01
This study provides an economic evaluation for a Land Ferry, which is a rail system capable of carrying trucks and all other types of vehicles, passengers, and cargo. The Land Ferry system involves a sliding loading system to roll heavy loads onto a flatbed; as a result, loading and unloading of all vehicles and cargo could be accomplished simultaneously. The evaluation for this system included (1) the design of a new track alignment over which the Land Ferry system would run, (2) evaluation of various sources of power, (3) estimation of how many local jobs the Land Ferry would generate, and (4) a benefit-cost analysis. It was estimated that the Land Ferry would create over 45,788 temporary jobs in Nevada during the three-year construction period and 318 permanent jobs during operation. The majority of the benefits were attributed to savings in travel time ($356.4 M), vehicle operating costs ($1000.4 M), reduction of accidents ($544.6 M), and pavement maintenance ($503.2 M). These benefits would be a consequence of the shift of trucks from the highway, thus resulting in higher speeds, decrease fuel consumption, and decrease vehicle maintenance costs. The overall benefit-cost ratio of 1.7 implies a cost-effective project. PMID:27419201
Lerner, E Brooke; Garrison, Herbert G; Nichol, Graham; Maio, Ronald F; Lookman, Hunaid A; Sheahan, William D; Franz, Timothy R; Austad, James D; Ginster, Aaron M; Spaite, Daniel W
2012-02-01
Calculating the cost of an emergency medical services (EMS) system using a standardized method is important for determining the value of EMS. This article describes the development of a methodology for calculating the cost of an EMS system to its community. This includes a tool for calculating the cost of EMS (the "cost workbook") and detailed directions for determining cost (the "cost guide"). The 12-step process that was developed is consistent with current theories of health economics, applicable to prehospital care, flexible enough to be used in varying sizes and types of EMS systems, and comprehensive enough to provide meaningful conclusions. It was developed by an expert panel (the EMS Cost Analysis Project [EMSCAP] investigator team) in an iterative process that included pilot testing the process in three diverse communities. The iterative process allowed ongoing modification of the toolkit during the development phase, based upon direct, practical, ongoing interaction with the EMS systems that were using the toolkit. The resulting methodology estimates EMS system costs within a user-defined community, allowing either the number of patients treated or the estimated number of lives saved by EMS to be assessed in light of the cost of those efforts. Much controversy exists about the cost of EMS and whether the resources spent for this purpose are justified. However, the existence of a validated toolkit that provides a standardized process will allow meaningful assessments and comparisons to be made and will supply objective information to inform EMS and community officials who are tasked with determining the utilization of scarce societal resources. © 2012 by the Society for Academic Emergency Medicine.
Advanced space communications architecture study. Volume 2: Technical report
NASA Technical Reports Server (NTRS)
Horstein, Michael; Hadinger, Peter J.
1987-01-01
The technical feasibility and economic viability of satellite system architectures that are suitable for customer premise service (CPS) communications are investigated. System evaluation is performed at 30/20 GHz (Ka-band); however, the system architectures examined are equally applicable to 14/11 GHz (Ku-band). Emphasis is placed on systems that permit low-cost user terminals. Frequency division multiple access (FDMA) is used on the uplink, with typically 10,000 simultaneous accesses per satellite, each of 64 kbps. Bulk demodulators onboard the satellite, in combination with a baseband multiplexer, convert the many narrowband uplink signals into a small number of wideband data streams for downlink transmission. Single-hop network interconnectivity is accomplished via downlink scanning beams. Each satellite is estimated to weigh 5600 lb and consume 6850W of power; the corresponding payload totals are 1000 lb and 5000 W. Nonrecurring satellite cost is estimated at $110 million, with the first-unit cost at $113 million. In large quantities, the user terminal cost estimate is $25,000. For an assumed traffic profile, the required system revenue has been computed as a function of the internal rate of return (IRR) on invested capital. The equivalent user charge per-minute of 64-kbps channel service has also been determined.
Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars
NASA Technical Reports Server (NTRS)
Hunt, Charles D.; vanPelt, Michel O.
2004-01-01
To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.
Optimal control of nonlinear continuous-time systems in strict-feedback form.
Zargarzadeh, Hassan; Dierks, Travis; Jagannathan, Sarangapani
2015-10-01
This paper proposes a novel optimal tracking control scheme for nonlinear continuous-time systems in strict-feedback form with uncertain dynamics. The optimal tracking problem is transformed into an equivalent optimal regulation problem through a feedforward adaptive control input that is generated by modifying the standard backstepping technique. Subsequently, a neural network-based optimal control scheme is introduced to estimate the cost, or value function, over an infinite horizon for the resulting nonlinear continuous-time systems in affine form when the internal dynamics are unknown. The estimated cost function is then used to obtain the optimal feedback control input; therefore, the overall optimal control input for the nonlinear continuous-time system in strict-feedback form includes the feedforward plus the optimal feedback terms. It is shown that the estimated cost function minimizes the Hamilton-Jacobi-Bellman estimation error in a forward-in-time manner without using any value or policy iterations. Finally, optimal output feedback control is introduced through the design of a suitable observer. Lyapunov theory is utilized to show the overall stability of the proposed schemes without requiring an initial admissible controller. Simulation examples are provided to validate the theoretical results.
NASA Astrophysics Data System (ADS)
Sirirojvisuth, Apinut
In complex aerospace system design, making an effective design decision requires multidisciplinary knowledge from both product and process perspectives. Integrating manufacturing considerations into the design process is most valuable during the early design stages since designers have more freedom to integrate new ideas when changes are relatively inexpensive in terms of time and effort. Several metrics related to manufacturability are cost, time, and manufacturing readiness level (MRL). Yet, there is a lack of structured methodology that quantifies how changes in the design decisions impact these metrics. As a result, a new set of integrated cost analysis tools are proposed in this study to quantify the impacts. Equally important is the capability to integrate this new cost tool into the existing design methodologies without sacrificing agility and flexibility required during the early design phases. To demonstrate the applicability of this concept, a ModelCenter environment is used to develop software architecture that represents Integrated Product and Process Development (IPPD) methodology used in several aerospace systems designs. The environment seamlessly integrates product and process analysis tools and makes effective transition from one design phase to the other while retaining knowledge gained a priori. Then, an advanced cost estimating tool called Hybrid Lifecycle Cost Estimating Tool (HLCET), a hybrid combination of weight-, process-, and activity-based estimating techniques, is integrated with the design framework. A new weight-based lifecycle cost model is created based on Tailored Cost Model (TCM) equations [3]. This lifecycle cost tool estimates the program cost based on vehicle component weights and programmatic assumptions. Additional high fidelity cost tools like process-based and activity-based cost analysis methods can be used to modify the baseline TCM result as more knowledge is accumulated over design iterations. Therefore, with this concept, the additional manufacturing knowledge can be used to identify a more accurate lifecycle cost and facilitate higher fidelity tradeoffs during conceptual and preliminary design. Advanced Composite Cost Estimating Model (ACCEM) is employed as a process-based cost component to replace the original TCM result of the composite part production cost. The reason for the replacement is that TCM estimates production costs from part weights as a result of subtractive manufacturing of metallic origin such as casting, forging, and machining processes. A complexity factor can sometimes be adjusted to reflect different types of metal and machine settings. The TCM assumption, however, gives erroneous results when applied to additive processes like those of composite manufacturing. Another innovative aspect of this research is the introduction of a work measurement technique called Maynard Operation Sequence Technique (MOST) to be used, similarly to Activity-Based Costing (ABC) approach, to estimate manufacturing time of a part by virtue of breaking down the operations occurred during its production. ABC allows a realistic determination of cost incurred in each activity, as opposed to using a traditional method of time estimation by analogy or using response surface equations from historical process data. The MOST concept provides a tailored study of an individual process typically required for a new, innovative design. Nevertheless, the MOST idea has some challenges, one of which is its requirement to build a new process from ground up. The process development requires a Subject Matter Expertise (SME) in manufacturing method of the particular design. The SME must have also a comprehensive understanding of the MOST system so that the correct parameters are chosen. In practice, these knowledge requirements may demand people from outside of the design discipline and a priori training of MOST. To relieve the constraint, this study includes an entirely new sub-system architecture that comprises 1) a knowledge-based system to provide the required knowledge during the process selection; and 2) a new user-interface to guide the parameter selection when building the process using MOST. Also included in this study is the demonstration of how the HLCET and its constituents can be integrated with a Georgia Tech' Integrated Product and Process Development (IPPD) methodology. The applicability of this work will be shown through a complex aerospace design example to gain insights into how manufacturing knowledge helps make better design decisions during the early stages. The setup process is explained with an example of its utility demonstrated in a hypothetical fighter aircraft wing redesign. The evaluation of the system effectiveness against existing methodologies is illustrated to conclude the thesis.
COSTS OF BEST MANAGEMENT PRACTICES AND ASSOCIATED LAND FOR URBAN STORMWATER CONTROL
The purpose of this paper is to present information on the cost of stormwater pollution control facilities in urban areas, including collection, control, and treatment systems. Information on prior cost studies of control technologies and cost estimating models used in these stu...
van der Pol, T D; van Ierland, E C; Gabbert, S; Weikard, H-P; Hendrix, E M T
2015-05-01
Stormwater drainage and other water systems are vulnerable to changes in rainfall and runoff and need to be adapted to climate change. This paper studies impacts of rainfall variability and changing return periods of rainfall extremes on cost-effective adaptation of water systems to climate change given a predefined system performance target, for example a flood risk standard. Rainfall variability causes system performance estimates to be volatile. These estimates may be used to recurrently evaluate system performance. This paper presents a model for this setting, and develops a solution method to identify cost-effective investments in stormwater drainage adaptations. Runoff and water levels are simulated with rainfall from stationary rainfall distributions, and time series of annual rainfall maxima are simulated for a climate scenario. Cost-effective investment strategies are determined by dynamic programming. The method is applied to study the choice of volume for a storage basin in a Dutch polder. We find that 'white noise', i.e. trend-free variability of rainfall, might cause earlier re-investment than expected under projected changes in rainfall. The risk of early re-investment may be reduced by increasing initial investment. This can be cost-effective if the investment involves fixed costs. Increasing initial investments, therefore, not only increases water system robustness to structural changes in rainfall, but could also offer insurance against additional costs that would occur if system performance is underestimated and re-investment becomes inevitable. Copyright © 2015 Elsevier Ltd. All rights reserved.
Benefit/cost comparison for utility SMES applications
NASA Astrophysics Data System (ADS)
Desteese, J. G.; Dagle, J. E.
1991-08-01
This paper summarizes eight case studies that account for the benefits and costs of superconducting magnetic energy storage (SMES) in system-specific utility applications. Four of these scenarios are hypothetical SMES applications in the Pacific Northwest, where relatively low energy costs impose a stringent test on the viability of the concept. The other four scenarios address SMES applications on high-voltage, direct-current (HVDC) transmission lines. While estimated SMES benefits are based on a previously reported methodology, this paper presents results of an improved cost-estimating approach that includes an assumed reduction in the cost of the power conditioning system (PCS) from approximately $160/kW to $80/kW. The revised approach results in all the SMES scenarios showing higher benefit/cost ratios than those reported earlier. However, in all but two cases, the value of any single benefit is still less than the unit's levelized cost. This suggests, as a general principle, that the total value of multiple benefits should always be considered if SMES is to appear cost effective in many utility applications. These results should offer utilities further encouragement to conduct more detailed analyses of SMES benefits in scenarios that apply to individual systems.
Cost Implications of Uncertainty in CO{sub 2} Storage Resource Estimates: A Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Steven T., E-mail: sanderson@usgs.gov
Carbon capture from stationary sources and geologic storage of carbon dioxide (CO{sub 2}) is an important option to include in strategies to mitigate greenhouse gas emissions. However, the potential costs of commercial-scale CO{sub 2} storage are not well constrained, stemming from the inherent uncertainty in storage resource estimates coupled with a lack of detailed estimates of the infrastructure needed to access those resources. Storage resource estimates are highly dependent on storage efficiency values or storage coefficients, which are calculated based on ranges of uncertain geological and physical reservoir parameters. If dynamic factors (such as variability in storage efficiencies, pressure interference,more » and acceptable injection rates over time), reservoir pressure limitations, boundaries on migration of CO{sub 2}, consideration of closed or semi-closed saline reservoir systems, and other possible constraints on the technically accessible CO{sub 2} storage resource (TASR) are accounted for, it is likely that only a fraction of the TASR could be available without incurring significant additional costs. Although storage resource estimates typically assume that any issues with pressure buildup due to CO{sub 2} injection will be mitigated by reservoir pressure management, estimates of the costs of CO{sub 2} storage generally do not include the costs of active pressure management. Production of saline waters (brines) could be essential to increasing the dynamic storage capacity of most reservoirs, but including the costs of this critical method of reservoir pressure management could increase current estimates of the costs of CO{sub 2} storage by two times, or more. Even without considering the implications for reservoir pressure management, geologic uncertainty can significantly impact CO{sub 2} storage capacities and costs, and contribute to uncertainty in carbon capture and storage (CCS) systems. Given the current state of available information and the scarcity of (data from) long-term commercial-scale CO{sub 2} storage projects, decision makers may experience considerable difficulty in ascertaining the realistic potential, the likely costs, and the most beneficial pattern of deployment of CCS as an option to reduce CO{sub 2} concentrations in the atmosphere.« less
Cost implications of uncertainty in CO2 storage resource estimates: A review
Anderson, Steven T.
2017-01-01
Carbon capture from stationary sources and geologic storage of carbon dioxide (CO2) is an important option to include in strategies to mitigate greenhouse gas emissions. However, the potential costs of commercial-scale CO2 storage are not well constrained, stemming from the inherent uncertainty in storage resource estimates coupled with a lack of detailed estimates of the infrastructure needed to access those resources. Storage resource estimates are highly dependent on storage efficiency values or storage coefficients, which are calculated based on ranges of uncertain geological and physical reservoir parameters. If dynamic factors (such as variability in storage efficiencies, pressure interference, and acceptable injection rates over time), reservoir pressure limitations, boundaries on migration of CO2, consideration of closed or semi-closed saline reservoir systems, and other possible constraints on the technically accessible CO2 storage resource (TASR) are accounted for, it is likely that only a fraction of the TASR could be available without incurring significant additional costs. Although storage resource estimates typically assume that any issues with pressure buildup due to CO2 injection will be mitigated by reservoir pressure management, estimates of the costs of CO2 storage generally do not include the costs of active pressure management. Production of saline waters (brines) could be essential to increasing the dynamic storage capacity of most reservoirs, but including the costs of this critical method of reservoir pressure management could increase current estimates of the costs of CO2 storage by two times, or more. Even without considering the implications for reservoir pressure management, geologic uncertainty can significantly impact CO2 storage capacities and costs, and contribute to uncertainty in carbon capture and storage (CCS) systems. Given the current state of available information and the scarcity of (data from) long-term commercial-scale CO2 storage projects, decision makers may experience considerable difficulty in ascertaining the realistic potential, the likely costs, and the most beneficial pattern of deployment of CCS as an option to reduce CO2 concentrations in the atmosphere.
Bang, Hyun J; Littrup, Peter J; Goodrich, Dylan J; Currier, Brandt P; Aoun, Hussein D; Heilbrun, Lance K; Vaishampayan, Ulka; Adam, Barbara; Goodman, Allen C
2012-06-01
To assess complications, local tumor recurrences, overall survival (OS), and estimates of cost-effectiveness for multisite cryoablation (MCA) of oligometastatic renal cell carcinoma (RCC). A total of 60 computed tomography- and/or ultrasound-guided percutaneous MCA procedures were performed on 72 tumors in 27 patients (three women and 24 men). Average patient age was 63 years. Tumor location was grouped according to common metastatic sites. Established surgical selection criteria graded patient status. Median OS was determined by Kaplan-Meier method and defined life-years gained (LYGs). Estimates of MCA costs per LYG were compared with established values for systemic therapies. Total number of tumors and cryoablation procedures for each anatomic site are as follows: nephrectomy bed, 11 and 11; adrenal gland, nine and eight; paraaortic, seven and six; lung, 14 and 13; bone, 13 and 13; superficial, 12 and nine; intraperitoneal, five and three; and liver, one and one. A mean of 2.2 procedures per patient were performed, with a median clinical follow-up of 16 months. Major complication and local recurrence rates were 2% (one of 60) and 3% (two of 72), respectively. No patients were graded as having good surgical risk, but median OS was 2.69 years, with an estimated 5-year survival rate of 27%. Cryoablation remained cost-effective with or without the presence of systemic therapies according to historical cost comparisons, with an adjunctive cost-effectiveness ratio of $28,312-$59,554 per LYG. MCA was associated with very low morbidity and local tumor recurrence rates for all anatomic sites, with apparent increased OS. Even as an adjunct to systemic therapies, MCA appeared cost-effective for palliation of oligometastatic RCC. Copyright © 2012 SIR. Published by Elsevier Inc. All rights reserved.
Ranmuthugala, Geetha; Brown, Laurie; Lidbury, Brett A
2011-06-01
Respiratory syncytial virus (RSV) presents very similar to influenza and is the principle cause of bronchiolitis in infants and young children worldwide. Yet, there is no systematic monitoring of RSV activity in Australia. This study uses existing published data sources to estimate incidence, hospitalisation rates, and associated costs of RSV among young children in Australia. Published reports from the Laboratory Virology and Serology Reporting Scheme, a passive voluntary surveillance system, and the National Hospital Morbidity Dataset were used to estimate RSV-related age-specific hospitalisation rates in New South Wales and Australia. These estimates and national USA estimates of RSV-related hospitalisation rates were applied to Australian population data to estimate RSV incidence in Australia. Direct economic burden was estimated by applying cost estimates used to derive economic cost associated with the influenza virus. The estimated RSV-related hospitalisation rates ranged from 2.2-4.5 per 1,000 among children less than 5 years of age to 8.7-17.4 per 1,000 among infants. Incidence ranged from 110.0-226.5 per 1,000 among the under five age group to 435.0-869.0 per 1,000 among infants. The total annual direct healthcare cost was estimated to be between $24 million and $50 million. Comparison with the health burdens attributed to the influenza virus and rotavirus suggests that the disease burden caused by RSV is potentially much higher. The limitations associated with using a passive surveillance system to estimate disease burden, and the need to explore further assessments and to monitor RSV activity are discussed.
The health system cost of post-abortion care in Rwanda.
Vlassoff, Michael; Musange, Sabine F; Kalisa, Ina R; Ngabo, Fidele; Sayinzoga, Felix; Singh, Susheela; Bankole, Akinrinola
2015-03-01
Based on research conducted in 2012, we estimate the cost to the Rwandan health-care system of providing post-abortion care (PAC) due to unsafe abortions, a subject of policy importance not studied before at the national level. Thirty-nine public and private health facilities representing three levels of health care were randomly selected for data collection from key care providers and administrators for all five regions. Using an ingredients approach to costing, data were gathered on drugs, supplies, material, personnel time and hospitalization. Additionally, direct non-medical costs such as overhead and capital costs were also measured. We found that the average annual PAC cost per client, across five types of abortion complications, was $93. The total cost of PAC nationally was estimated to be $1.7 million per year, 49% of which was expended on direct non-medical costs. Satisfying all demands for PAC would raise the national cost to $2.5 million per year. PAC comprises a significant share of total expenditure in reproductive health in Rwanda. Investing more resources in provision of contraceptive services to prevent unwanted or mistimed pregnancies would likely reduce health systems costs. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014.
Highway User Benefit Analysis System Research Project #128
DOT National Transportation Integrated Search
2000-10-01
In this research, a methodology for estimating road user costs of various competing alternatives was developed. Also, software was developed to calculate the road user cost, perform economic analysis and update cost tables. The methodology is based o...
Economical space power systems
NASA Technical Reports Server (NTRS)
Burkholder, J. H.
1980-01-01
A commercial approach to design and fabrication of an economical space power system is investigated. Cost projections are based on a 2 kW space power system conceptual design taking into consideration the capability for serviceability, constraints of operation in space, and commercial production engineering approaches. A breakdown of the system design, documentation, fabrication, and reliability and quality assurance estimated costs are detailed.
Use of multispectral data in design of forest sample surveys
NASA Technical Reports Server (NTRS)
Titus, S. J.; Wensel, L. C.
1977-01-01
The use of multispectral data in design of forest sample surveys using a computer software package is described. The system allows evaluation of a number of alternative sampling systems and, with appropriate cost data, estimates the implementation cost for each.
Use of multispectral data in design of forest sample surveys
NASA Technical Reports Server (NTRS)
Titus, S. J.; Wensel, L. C.
1977-01-01
The use of multispectral data in design of forest sample surveys using a computer software package, WILLIAM, is described. The system allows evaluation of a number of alternative sampling systems and, with appropriate cost data, estimates the implementation cost for each.
NASA Technical Reports Server (NTRS)
Borden, C. S.; Volkmer, K.; Cochrane, E. H.; Lawson, A. C.
1984-01-01
A simple methodology to estimate photovoltaic system size and life-cycle costs in stand-alone applications is presented. It is designed to assist engineers at Government agencies in determining the feasibility of using small stand-alone photovoltaic systems to supply ac or dc power to the load. Photovoltaic system design considerations are presented as well as the equations for sizing the flat-plate array and the battery storage to meet the required load. Cost effectiveness of a candidate photovoltaic system is based on comparison with the life-cycle cost of alternative systems. Examples of alternative systems addressed are batteries, diesel generators, the utility grid, and other renewable energy systems.
Economic burden of seasonal influenza in the United States.
Putri, Wayan C W S; Muscatello, David J; Stockwell, Melissa S; Newall, Anthony T
2018-05-22
Seasonal influenza is responsible for a large disease and economic burden. Despite the expanding recommendation of influenza vaccination, influenza has continued to be a major public health concern in the United States (U.S.). To evaluate influenza prevention strategies it is important that policy makers have current estimates of the economic burden of influenza. To provide an updated estimate of the average annual economic burden of seasonal influenza in the U.S. population in the presence of vaccination efforts. We evaluated estimates of age-specific influenza-attributable outcomes (ill-non medically attended, office-based outpatient visit, emergency department visits, hospitalizations and death) and associated productivity loss. Health outcome rates were applied to the 2015 U.S. population and multiplied by the relevant estimated unit costs for each outcome. We evaluated both direct healthcare costs and indirect costs (absenteeism from paid employment) reporting results from both a healthcare system and societal perspective. Results were presented in five age groups (<5 years, 5-17 years, 18-49 years, 50-64 years and ≥65 years of age). The estimated average annual total economic burden of influenza to the healthcare system and society was $11.2 billion ($6.3-$25.3 billion). Direct medical costs were estimated to be $3.2 billion ($1.5-$11.7 billion) and indirect costs $8.0 billion ($4.8-$13.6 billion). These total costs were based on the estimated average numbers of (1) ill-non medically attended patients (21.6 million), (2) office-based outpatient visits (3.7 million), (3) emergency department visit (0.65 million) (4) hospitalizations (247.0 thousand), (5) deaths (36.3 thousand) and (6) days of productivity lost (20.1 million). This study provides an updated estimate of the total economic burden of influenza in the U.S. Although we found a lower total cost than previously estimated, our results confirm that influenza is responsible for a substantial economic burden in the U.S. Copyright © 2018. Published by Elsevier Ltd.
NASA Astrophysics Data System (ADS)
Ristow, Alan H.
2008-10-01
Electricity generated from photovoltaics (PV) promises to satisfy the world's ever-growing thirst for energy without significant pollution and greenhouse gas emissions. At present, however, PV is several times too expensive to compete economically with conventional sources of electricity delivered via the power grid. To ensure long-term success, must achieve cost parity with electricity generated by conventional sources of electricity. This requires detailed understanding of the relationship between technology and economics as it pertains to PV devices and systems. The research tasks of this thesis focus on developing and using four types of models in concert to develop a complete picture of how solar cell technology and design choices affect the quantity and cost of energy produced by PV systems. It is shown in this thesis that high-efficiency solar cells can leverage balance-of-systems (BOS) costs to gain an economic advantage over solar cells with low efficiencies. This advantage is quantified and dubbed the "efficiency premium." Solar cell device models are linked to models of manufacturing cost and PV system performance to estimate both PV system cost and performance. These, in turn, are linked to a model of levelized electricity cost to estimate the per-kilowatt-hour cost of electricity produced by the PV system. A numerical PV module manufacturing cost model is developed to facilitate this analysis. The models and methods developed in this thesis are used to propose a roadmap to high-efficiency multicrystalline-silicon PV modules that achieve cost parity with electricity from the grid. The impact of PV system failures on the cost of electricity is also investigated; from this, a methodology is proposed for improving the reliability of PV inverters.
Tompa, Emile; Dolinschi, Roman; Alamgir, Hasanat; Sarnocinska-Hart, Anna; Guzman, Jaime
2016-05-01
To evaluate whether a peer-coaching programme for patient lift use in British Columbia, Canada, was effective and cost-beneficial. We used monthly panel data from 15 long-term care facilities from 2004 to 2011 to estimate the number of patient-handling injuries averted by the peer-coaching programme using a generalised estimating equation model. Facilities that had not yet introduced the programme served as concurrent controls. Accepted lost-time claim counts related to patient handling were the outcome of interest with a denominator of full-time equivalents of nursing staff. A cost-benefit approach was used to estimate the net monetary gains at the system level. The coaching programme was found to be associated with a reduction in the injury rate of 34% during the programme and 56% after the programme concluded with an estimated 62 lost-time injury claims averted. 2 other factors were associated with changes in injury rates: larger facilities had a lower injury rate, and the more care hours per bed the lower the injury rate. We calculated monetary benefits to the system of $748 431 and costs of $894 000 (both in 2006 Canadian dollars) with a benefit-to-cost ratio of 0.84. The benefit-to-cost ratio was -0.05 in the worst case scenario and 2.31 in the best case scenario. The largest cost item was peer coaches' time. A simulation of the programme continuing for 5 years with the same coaching intensity would result in a benefit-to-cost ratio of 0.63. A peer-coaching programme to increase effective use of overhead lifts prevented additional patient-handling injuries but added modest incremental cost to the system. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
Economic Studies in Colorectal Cancer: Challenges in Measuring and Comparing Costs
2013-01-01
Estimates of the costs associated with cancer care are essential both for assessing burden of disease at the population level and for conducting economic evaluations of interventions to prevent, detect, or treat cancer. Comparisons of cancer costs between health systems and across countries can improve understanding of the economic consequences of different health-care policies and programs. We conducted a structured review of the published literature on colorectal cancer (CRC) costs, including direct medical, direct nonmedical (ie, patient and caregiver time, travel), and productivity losses. We used MEDLINE to identify English language articles published between 2000 and 2010 and found 55 studies. The majority were conducted in the United States (52.7%), followed by France (12.7%), Canada (10.9%), the United Kingdom (9.1%), and other countries (9.1%). Almost 90% of studies estimated direct medical costs, but few studies estimated patient or caregiver time costs or productivity losses associated with CRC. Within a country, we found significant heterogeneity across the studies in populations examined, health-care delivery settings, methods for identifying incident and prevalent patients, types of medical services included, and analyses. Consequently, findings from studies with seemingly the same objective (eg, costs of chemotherapy in year following CRC diagnosis) are difficult to compare. Across countries, aggregate and patient-level estimates vary in so many respects that they are almost impossible to compare. Our findings suggest that valid cost comparisons should be based on studies with explicit standardization of populations, services, measures of costs, and methods with the goal of comparability within or between health systems or countries. Expected increases in CRC prevalence and costs in the future highlight the importance of such studies for informing health-care policy and program planning. PMID:23962510
Operations and support cost modeling using Markov chains
NASA Technical Reports Server (NTRS)
Unal, Resit
1989-01-01
Systems for future missions will be selected with life cycle costs (LCC) as a primary evaluation criterion. This reflects the current realization that only systems which are considered affordable will be built in the future due to the national budget constaints. Such an environment calls for innovative cost modeling techniques which address all of the phases a space system goes through during its life cycle, namely: design and development, fabrication, operations and support; and retirement. A significant portion of the LCC for reusable systems are generated during the operations and support phase (OS). Typically, OS costs can account for 60 to 80 percent of the total LCC. Clearly, OS costs are wholly determined or at least strongly influenced by decisions made during the design and development phases of the project. As a result OS costs need to be considered and estimated early in the conceptual phase. To be effective, an OS cost estimating model needs to account for actual instead of ideal processes by associating cost elements with probabilities. One approach that may be suitable for OS cost modeling is the use of the Markov Chain Process. Markov chains are an important method of probabilistic analysis for operations research analysts but they are rarely used for life cycle cost analysis. This research effort evaluates the use of Markov Chains in LCC analysis by developing OS cost model for a hypothetical reusable space transportation vehicle (HSTV) and suggests further uses of the Markov Chain process as a design-aid tool.
Redondo, Jonatan Pajares; González, Lisardo Prieto; Guzman, Javier García; Boada, Beatriz L; Díaz, Vicente
2018-02-06
Nowadays, the current vehicles are incorporating control systems in order to improve their stability and handling. These control systems need to know the vehicle dynamics through the variables (lateral acceleration, roll rate, roll angle, sideslip angle, etc.) that are obtained or estimated from sensors. For this goal, it is necessary to mount on vehicles not only low-cost sensors, but also low-cost embedded systems, which allow acquiring data from sensors and executing the developed algorithms to estimate and to control with novel higher speed computing. All these devices have to be integrated in an adequate architecture with enough performance in terms of accuracy, reliability and processing time. In this article, an architecture to carry out the estimation and control of vehicle dynamics has been developed. This architecture was designed considering the basic principles of IoT and integrates low-cost sensors and embedded hardware for orchestrating the experiments. A comparison of two different low-cost systems in terms of accuracy, acquisition time and reliability has been done. Both devices have been compared with the VBOX device from Racelogic, which has been used as the ground truth. The comparison has been made from tests carried out in a real vehicle. The lateral acceleration and roll rate have been analyzed in order to quantify the error of these devices.
Díaz, Vicente
2018-01-01
Nowadays, the current vehicles are incorporating control systems in order to improve their stability and handling. These control systems need to know the vehicle dynamics through the variables (lateral acceleration, roll rate, roll angle, sideslip angle, etc.) that are obtained or estimated from sensors. For this goal, it is necessary to mount on vehicles not only low-cost sensors, but also low-cost embedded systems, which allow acquiring data from sensors and executing the developed algorithms to estimate and to control with novel higher speed computing. All these devices have to be integrated in an adequate architecture with enough performance in terms of accuracy, reliability and processing time. In this article, an architecture to carry out the estimation and control of vehicle dynamics has been developed. This architecture was designed considering the basic principles of IoT and integrates low-cost sensors and embedded hardware for orchestrating the experiments. A comparison of two different low-cost systems in terms of accuracy, acquisition time and reliability has been done. Both devices have been compared with the VBOX device from Racelogic, which has been used as the ground truth. The comparison has been made from tests carried out in a real vehicle. The lateral acceleration and roll rate have been analyzed in order to quantify the error of these devices. PMID:29415507
NASA Technical Reports Server (NTRS)
1973-01-01
Power subsystem cost/weight tradeoffs are discussed for the Venus probe spacecraft. The cost estimations of power subsystem units were based upon DSCS-2, DSP, and Pioneer 10 and 11 hardware design and development and manufacturing experience. Parts count and degree of modification of existing hardware were factored into the estimate of manufacturing and design and development costs. Cost data includes sufficient quantities of units to equip probe bus and orbiter versions. It was based on the orbiter complement of equipment, but the savings in fewer slices for the probe bus balance the cost of the different probe bus battery. The preferred systems for the Thor/Delta and for the Atlas/Centaur are discussed. The weights of the candidate designs were based upon slice or tray weights for functionally equivalent circuitry measured on existing hardware such as Pioneers 10 and 11, Intelsat 3, DSCS-2, or DSP programs. Battery weights were based on measured cell weight data adjusted for case weight or off-the-shelf battery weights. The solar array weight estimate was based upon recent hardware experience on DSCS-2 and DSP arrays.
The use of cluster analysis techniques in spaceflight project cost risk estimation
NASA Technical Reports Server (NTRS)
Fox, G.; Ebbeler, D.; Jorgensen, E.
2003-01-01
Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.
48 CFR 30.606 - Resolving cost impacts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Resolving cost impacts. 30... impacts. (a) General. (1) The CFAO shall coordinate with the affected contracting officers before negotiating and resolving the cost impact when the estimated cost impact on any of their contracts is at least...
ERIC Educational Resources Information Center
Rhode, William E.; And Others
Basic cost estimates for selected instructional media are tabled in this document, Part II (Appendix III) of the report "Analysis and Approach to the Development of an Advanced Multimedia Instructional System" by William E. Rhode and others. Learning materials production costs are given for motion pictures, still visuals, videotapes, live…
USDA-ARS?s Scientific Manuscript database
The objective of this research was to develop an in-field apple presorting and grading system to separate undersized and defective fruit from fresh market-grade apples. To achieve this goal, a cost-effective machine vision inspection prototype was built, which consisted of a low-cost color camera, L...
Integrating Solar PV in Utility System Operations: Analytical Framework and Arizona Case Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, Jing; Botterud, Audun; Mills, Andrew
2015-06-01
A systematic framework is proposed to estimate the impact on operating costs due to uncertainty and variability in renewable resources. The framework quantifies the integration costs associated with subhourly variability and uncertainty as well as day-ahead forecasting errors in solar PV (photovoltaics) power. A case study illustrates how changes in system operations may affect these costs for a utility in the southwestern United States (Arizona Public Service Company). We conduct an extensive sensitivity analysis under different assumptions about balancing reserves, system flexibility, fuel prices, and forecasting errors. We find that high solar PV penetrations may lead to operational challenges, particularlymore » during low-load and high solar periods. Increased system flexibility is essential for minimizing integration costs and maintaining reliability. In a set of sensitivity cases where such flexibility is provided, in part, by flexible operations of nuclear power plants, the estimated integration costs vary between $1.0 and $4.4/MWh-PV for a PV penetration level of 17%. The integration costs are primarily due to higher needs for hour-ahead balancing reserves to address the increased sub-hourly variability and uncertainty in the PV resource. (C) 2015 Elsevier Ltd. All rights reserved.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denholm, P.; Margolis, R.; Palmintier, B.
This report outlines the methods, data, and tools that could be used at different levels of sophistication and effort to estimate the benefits and costs of DGPV. In so doing, we identify the gaps in current benefit-cost-analysis methods, which we hope will inform the ongoing research agenda in this area. The focus of this report is primarily on benefits and costs from the utility or electricity generation system perspective. It is intended to provide useful background information to utility and regulatory decision makers and their staff, who are often being asked to use or evaluate estimates of the benefits andmore » cost of DGPV in regulatory proceedings. Understanding the technical rigor of the range of methods and how they might need to evolve as DGPV becomes a more significant contributor of energy to the electricity system will help them be better consumers of this type of information. This report is also intended to provide information to utilities, policy makers, PV technology developers, and other stakeholders, which might help them maximize the benefits and minimize the costs of integrating DGPV into a changing electricity system.« less
1997-09-01
factor values are identified. For SASET, revised cost estimating relationships are provided ( Apgar et al., 1991). A 1991 AFIT thesis by Gerald Ourada...description of the model is a paragraph directly quoted from the user’s manual . This is not to imply that a lack of a thorough analysis indicates...constraints imposed by the system. The effective technology rating is computed from the basic technology rating by the following equation ( Apgar et al., 1991
Coal gasification systems engineering and analysis. Appendix D: Cost and economic studies
NASA Technical Reports Server (NTRS)
1980-01-01
The detailed cost estimate documentation for the designs prepared in this study are presented. The include: (1) Koppers-Totzek, (2) Texaco (3) Babcock and Wilcox, (4) BGC-Lurgi, and (5) Lurgi. The alternate product cost estimates include: (1) Koppers-Totzek and Texaco single product facilities (methane, methanol, gasoline, hydrogen), (2) Kopers-Totzek SNG and MBG, (3) Kopers-Totzek and Texaco SNG and MBG, and (4) Lurgi-methane and Lurgi-methane and methanol.
Cost-effectiveness analysis of a hospital electronic medication management system.
Westbrook, Johanna I; Gospodarevskaya, Elena; Li, Ling; Richardson, Katrina L; Roffe, David; Heywood, Maureen; Day, Richard O; Graves, Nicholas
2015-07-01
To conduct a cost-effectiveness analysis of a hospital electronic medication management system (eMMS). We compared costs and benefits of paper-based prescribing with a commercial eMMS (CSC MedChart) on one cardiology ward in a major 326-bed teaching hospital, assuming a 15-year time horizon and a health system perspective. The eMMS implementation and operating costs were obtained from the study site. We used data on eMMS effectiveness in reducing potential adverse drug events (ADEs), and potential ADEs intercepted, based on review of 1 202 patient charts before (n = 801) and after (n = 401) eMMS. These were combined with published estimates of actual ADEs and their costs. The rate of potential ADEs following eMMS fell from 0.17 per admission to 0.05; a reduction of 71%. The annualized eMMS implementation, maintenance, and operating costs for the cardiology ward were A$61 741 (US$55 296). The estimated reduction in ADEs post eMMS was approximately 80 actual ADEs per year. The reduced costs associated with these ADEs were more than sufficient to offset the costs of the eMMS. Estimated savings resulting from eMMS implementation were A$63-66 (US$56-59) per admission (A$97 740-$102 000 per annum for this ward). Sensitivity analyses demonstrated results were robust when both eMMS effectiveness and costs of actual ADEs were varied substantially. The eMMS within this setting was more effective and less expensive than paper-based prescribing. Comparison with the few previous full economic evaluations available suggests a marked improvement in the cost-effectiveness of eMMS, largely driven by increased effectiveness of contemporary eMMs in reducing medication errors. © The Author 2015. Published by Oxford University Press on behalf of the American Medical Informatics Association.
Zubiaurre, Paula Rosales; Bahia, Luciana Ribeiro; da Rosa, Michelle Quarti Machado; Assumpção, Roberto Pereira; Padoin, Alexandre Vontobel; Sussembach, Samanta Pereira; da Silva, Everton Nunes; Mottin, Claudio Corá
2017-12-01
Obesity is a major global epidemic and a burden to society and health systems. This study aimed to estimate and compare the anual costs of clinical and surgical treatment of severe obesity from the perspective of the Brazilian Public Health System. An observational and cross-sectional study was performed in three reference centers. Data collection on health resources utilization and productivity loss was carried out through an online questionnaire. Participants were divided in clinical (waiting list for a bariatric surgery) and surgical groups (open Roux-en-Y gastric bypass), and then allocated by the time of surgery (up to 1 year; 1-2 years; 2-3 years; and >3 years). Costs of visits, medications, exams, and surgeries were obtained from government sources. Data on non-medical costs, such as transportation, special diets, and caregivers, were also colleted. Productivity loss was estimated using self-reported income. Costs in local currency (Real) were converted to international dollars (Int$ 2015). Two hundred and seventy-four patients, 140 in surgical group and 134 in clinical group were included. In first postoperative year, the surgical group had higher costs than clinical group (Int$6005.47 [5000.18-8262.36] versus 2148.14 [1412.2-3506.8]; p = 0.0002); however, from the second year, the costs decreased progressively. In the same way, indirect costs decreased significantly after surgery (259.08 [163.63-662.72] versus 368.17 [163.62-687.27]; p = 0.06). Total costs were higher in the surgical group in the first 2 years after surgery. However, from the third year on, the costs were lower than in the clinical group.
Comparative costs of family planning services and hospital-based maternity care in Turkey.
Cakir, H V; Fabricant, S J; Kircalioğlu, F N
1996-01-01
The costs of running a recently established family planning program in the Turkish social security system were measured and compared with the costs of providing the medical services and nonmedical benefits for pregnant women. The undiscounted cost savings from averting pregnancy were estimated to exceed the program's recurrent costs by 17.6 to 1. Cost savings represent only 1 percent of all of the system's medical expenditures, but the family planning program is in an early stage, and potential savings could influence management decisionmaking regarding investments in specialized maternity hospitals.
Planning and Decision Making for Medical Education: An Analysis of Costs and Benefits.
ERIC Educational Resources Information Center
Wing, Paul
This paper clarifies the role of medical education in the large health care system, estimates the resources required to carry on medical education programs and the benefits that accrue from medical education, and answers a few fundamental policy questions. Cost estimates are developed on a program-by-program basis, using empirical economic…
Nefdt, Rory; Ribaira, Eric; Diallo, Khassoum
2014-10-01
To ensure correct and appropriate funding is available, there is a need to estimate resource needs for improved planning and implementation of integrated Community Case Management (iCCM). To compare and estimate costs for commodity and human resource needs for iCCM, based on treatment coverage rates, bottlenecks and national targets in Ethiopia, Kenya and Zambia from 2014 to 2016. Resource needs were estimated using Ministry of Health (MoH) targets fronm 2014 to 2016 for implementation of case management of pneumonia, diarrhea and malaria through iCCM based on epidemiological, demographic, economic, intervention coverage and other health system parameters. Bottleneck analysis adjusted cost estimates against system barriers. Ethiopia, Kenya and Zambia were chosen to compare differences in iCCM costs in different programmatic implementation landscapes. Coverage treatment rates through iCCM are lowest in Ethiopia, followed by Kenya and Zambia, but Ethiopia had the greatest increases between 2009 and 2012. Deployment of health extension workers (HEWs) in Ethiopia is more advanced compared to Kenya and Zambia, which have fewer equivalent cadres (called commu- nity health workers (CHWs)) covering a smaller proportion of the population. Between 2014 and 2016, the propor- tion of treatments through iCCM compared to health centres are set to increase from 30% to 81% in Ethiopia, 1% to 18% in Kenya and 3% to 22% in Zambia. The total estimated cost of iCCM for these three years are USD 75,531,376 for Ethiopia, USD 19,839,780 for Kenya and USD 33,667,742 for Zambia. Projected per capita expen- diture for 2016 is USD 0.28 for Ethiopia, USD 0.20 in Kenya and USD 0.98 in Zambia. Commodity costs for pneumonia and diarrhea were a small fraction of the total iCCM budget for all three countries (less than 3%), while around 80% of the costs related to human resources. Analysis of coverage, demography and epidemiology data improves estimates of fimding requirements for iCCM. Bottleneck analysis adjusts cost estimates by including system barriers, thus reflecting a more accurate estimate of potential resource utilization. Adding pneumonia and diarrhea interventions to existing large scale community-based malaria case management programs is likely to require relatively small and nationally affordable investments. iCCM can be implemented for USD 0.09 to 0.98 per capita per annum, depending on the stage of scale-up and targets set by the MoH.
Future trends in power generation cost by power resource
NASA Astrophysics Data System (ADS)
1992-08-01
The Japan Energy Economy Research Institute has been evaluating power generation cost by each power resource every year focusing on nuclear power generation. The Institute is surveying the cost evaluations by power resources in France, Britain and the U.S.A., the nuclear generation advanced nations. The OECD is making power generation cost estimation using a hypothesis which uniforms basically the conditions varying in different member countries. In model power generation cost calculations conducted by the Ministry of International Trade and Industry of Japan, nuclear power generation is the most economical system in any fiscal year. According to recent calculations performed by the Japan Energy Economy Research Institute, the situation is such that it is difficult to distinguish the economical one from others among the power generation systems in terms of generation costs except for thermal power generation. Economic evaluations are given on estimated power generation costs based on construction costs for nuclear and thermal power plants, nuclear fuel cycling cost, and fuel cost data on petroleum, LNG and coal. With regard to the future trends, scenario analyses are made on generation costs, that assume fluctuations in fuel prices and construction costs, the important factors to give economic influence on power generation.
Technology management: a perspective on system support, procurement, and replacement planning.
Dickerson, M L; Jackson, M E
1992-01-01
The escalating costs associated with medical technology present a host of challenges for the hospital clinical engineering department. As service and support costs comprise ever larger portions of a system's life cycle cost, innovative management of service provider mix and mechanisms can provide substantial savings in operating expenses. In addition to full-service contracts, the use of demand service and independents has become commonplace. Medical equipment maintenance insurance programs provide yet another service alternative, combining the flexibility of demand service with the safety of a capped budget. These programs have gained acceptance among hospitals as their providers have become more focused on the healthcare market and its many needs. In view of the long-term cost impact surrounding technology procurement, the authors recommend that hospitals refine system evaluation methodologies and develop more comprehensive techniques directed at capital equipment replacement planning. One replacement planning approach, based on an estimation of system value changes, is described and illustrated using data collected through client consultations. Although the validity of this method has not been demonstrated, it represents a simplified approach to life cycle cost analysis and is intended to provide a standard method by which system replacement planning may be quantified. As a departure from system devaluation based solely on depreciation, this method estimates prospective system values derived from anticipated operations and maintenance costs, projected revenue, and the availability of new technology.
Evans, W K
1997-04-01
Statistics Canada (Ottawa, Ontario, Canada) is in the process of developing the Population Health Model to simulate the health and common illnesses of Canadians. The Population Health Model incorporates a lung cancer module that is based on contemporary Canadian practice. This microsimulation model can be used to estimate the total direct care costs of treating all lung cancer cases diagnosed in Canada and to evaluate the cost and cost-effectiveness of new therapeutic interventions as they are introduced into practice. Gemcitabine, a new nucleoside analogue with a broad spectrum of antitumor activity, is about to be introduced on the Canadian market. The Population Health Model has been used to estimate the cost-effectiveness of gemcitabine in the management of lung cancer over a range of drug doses per treatment cycle starting at 1,000 mg/m2 weekly x 3, as well as potential survival benefits. The survival of stage IV non-small cell lung cancer (NSCLC) patients treated on an international trial of gemcitabine (EO-18) was used to estimate the potential survival gain relative to the survival of stage IV NSCLC patients managed with best supportive care on a randomized trial conducted by the National Cancer Institute of Canada (BR 5). Sensitivity analyses were performed assuming that the survival gain was 25% or 50% less than that reported in the EO-18 trial. The perspective of the economic analysis is that of the government as payer in a universal health care system, and all costs are expressed in 1993 Canadian dollars. Based on the apparent survival advantage of the EO-18 trial in comparison to best supportive care, the cost per life-year gained ranged from $632 to $9,285, depending on the dose per treatment cycle. At the highest dose per cycle (2,000 mg/m2) and with survival reduced by 50% as compared with the EO-18 result, the cost per life-year gained was estimated to be $17,390. From these estimates of direct care costs in the Canadian health care system, gemcitabine appears to be a cost-effective intervention for advanced NSCLC.
DOT National Transportation Integrated Search
The purpose of this report, "Working Paper National Costs of the Metropolitan ITS infrastructure: Updated with 2004 Deployment Data," is to update the estimates of the costs remaining to deploy Intelligent Transportation Systems (ITS) infrastructure ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paul, Prokash; Bhattacharyya, Debangsu; Turton, Richard
Here, a novel sensor network design (SND) algorithm is developed for maximizing process efficiency while minimizing sensor network cost for a nonlinear dynamic process with an estimator-based control system. The multiobjective optimization problem is solved following a lexicographic approach where the process efficiency is maximized first followed by minimization of the sensor network cost. The partial net present value, which combines the capital cost due to the sensor network and the operating cost due to deviation from the optimal efficiency, is proposed as an alternative objective. The unscented Kalman filter is considered as the nonlinear estimator. The large-scale combinatorial optimizationmore » problem is solved using a genetic algorithm. The developed SND algorithm is applied to an acid gas removal (AGR) unit as part of an integrated gasification combined cycle (IGCC) power plant with CO 2 capture. Due to the computational expense, a reduced order nonlinear model of the AGR process is identified and parallel computation is performed during implementation.« less
NASA Technical Reports Server (NTRS)
Gerberich, Matthew W.; Oleson, Steven R.
2013-01-01
The Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at Glenn Research Center has performed integrated system analysis of conceptual spacecraft mission designs since 2006 using a multidisciplinary concurrent engineering process. The set of completed designs was archived in a database, to allow for the study of relationships between design parameters. Although COMPASS uses a parametric spacecraft costing model, this research investigated the possibility of using a top-down approach to rapidly estimate the overall vehicle costs. This paper presents the relationships between significant design variables, including breakdowns of dry mass, wet mass, and cost. It also develops a model for a broad estimate of these parameters through basic mission characteristics, including the target location distance, the payload mass, the duration, the delta-v requirement, and the type of mission, propulsion, and electrical power. Finally, this paper examines the accuracy of this model in regards to past COMPASS designs, with an assessment of outlying spacecraft, and compares the results to historical data of completed NASA missions.
Paul, Prokash; Bhattacharyya, Debangsu; Turton, Richard; ...
2017-06-06
Here, a novel sensor network design (SND) algorithm is developed for maximizing process efficiency while minimizing sensor network cost for a nonlinear dynamic process with an estimator-based control system. The multiobjective optimization problem is solved following a lexicographic approach where the process efficiency is maximized first followed by minimization of the sensor network cost. The partial net present value, which combines the capital cost due to the sensor network and the operating cost due to deviation from the optimal efficiency, is proposed as an alternative objective. The unscented Kalman filter is considered as the nonlinear estimator. The large-scale combinatorial optimizationmore » problem is solved using a genetic algorithm. The developed SND algorithm is applied to an acid gas removal (AGR) unit as part of an integrated gasification combined cycle (IGCC) power plant with CO 2 capture. Due to the computational expense, a reduced order nonlinear model of the AGR process is identified and parallel computation is performed during implementation.« less
Civil Uses of Remotely Piloted Aircraft
NASA Technical Reports Server (NTRS)
Aderhold, J. R.; Gordon, G.; Scott, G. W.
1976-01-01
The technology effort is identified and assessed that is required to bring the civil uses of RPVs to fruition and to determine whether or not the potential market is real and economically practical, the technologies are within reach, the operational problems are manageable, and the benefits are worth the cost. To do so, the economic, technical, and environmental implications are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RPV systems is estimated. Typical cost savings of 25-35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.
State-Level Estimates of Obesity-Attributable Costs of Absenteeism
Andreyeva, Tatiana; Luedicke, Joerg; Wang, Y. Claire
2014-01-01
Objective To provide state-level estimates of obesity-attributable costs of absenteeism among working adults in the U.S. Methods Nationally-representative data from the National Health and Nutrition Examination Survey (NHANES) for 1998–2008 and from the Behavioral Risk Factor Surveillance System (BRFSS) for 2012 are examined. The outcome is obesity-attributable workdays missed in the previous year due to health, and their costs to states. Results Obesity, but not overweight, is associated with a significant increase in workdays absent, from 1.1 to 1.7 extra days missed annually compared to normal weight employees. Obesity-attributable absenteeism among American workers costs the nation an estimated $8.65 billion per year. Conclusion Obesity imposes a considerable financial burden on states, accounting for 6.5%–12.6% of total absenteeism costs in the workplace. State legislature and employers should seek effective ways to reduce these costs. PMID:25376405
Estimating the cost of caring for people with cancer at the end of life: A modelling study
Round, Jeff; Jones, Louise; Morris, Steve
2015-01-01
Background: People with advanced cancer require a range of health, social and informal care during the final phases of life. The cost of providing care to this group as they approach the end of their lives is unknown, but represents a significant cost to health and social care systems, charities patients and their families. Aim: In this study, we estimate the direct and indirect costs for lung, breast, colorectal and prostate cancer patients at the end of life (from the start of strong opioids to death) in England and Wales. Methods: We use a modelling-based approach to estimate the costs of care. Data are estimated from the literature and publicly available data sets. Probabilistic sensitivity analysis is used to reflect uncertainty in model estimates. Results: Total estimated costs for treating people with these four cancers at the end of life are £641 million. Breast and prostate cancer patients have the highest expected cost per person at £12,663 (95% credible interval (CI): £1249–£38,712) and £14,859 (95% CI: £1391–£46,424), respectively. Lung cancer has the highest expected total cost (£226m). The value of informal care giving accounts for approximately one-third of all costs. Conclusion: The cost to society of providing care to people at the end of their lives is significant. Much of this cost is borne by informal care givers. The cost to formal care services of replacing this care with paid care giving would be significant and demand for care will increase as the demographic profile of the population ages. PMID:26199134
Simple calculator to estimate the medical cost of diabetes in sub-Saharan Africa
Alouki, Koffi; Delisle, Hélène; Besançon, Stéphane; Baldé, Naby; Sidibé-Traoré, Assa; Drabo, Joseph; Djrolo, François; Mbanya, Jean-Claude; Halimi, Serge
2015-01-01
AIM: To design a medical cost calculator and show that diabetes care is beyond reach of the majority particularly patients with complications. METHODS: Out-of-pocket expenditures of patients for medical treatment of type-2 diabetes were estimated based on price data collected in Benin, Burkina Faso, Guinea and Mali. A detailed protocol for realistic medical care of diabetes and its complications in the African context was defined. Care components were based on existing guidelines, published data and clinical experience. Prices were obtained in public and private health facilities. The cost calculator used Excel. The cost for basic management of uncomplicated diabetes was calculated per person and per year. Incremental costs were also computed per annum for chronic complications and per episode for acute complications. RESULTS: Wide variations of estimated care costs were observed among countries and between the public and private healthcare system. The minimum estimated cost for the treatment of uncomplicated diabetes (in the public sector) would amount to 21%-34% of the country’s gross national income per capita, 26%-47% in the presence of retinopathy, and above 70% for nephropathy, the most expensive complication. CONCLUSION: The study provided objective evidence for the exorbitant medical cost of diabetes considering that no medical insurance is available in the study countries. Although the calculator only estimates the cost of inaction, it is innovative and of interest for several stakeholders. PMID:26617974
NASA Astrophysics Data System (ADS)
Schwabe, O.; Shehab, E.; Erkoyuncu, J.
2015-08-01
The lack of defensible methods for quantifying cost estimate uncertainty over the whole product life cycle of aerospace innovations such as propulsion systems or airframes poses a significant challenge to the creation of accurate and defensible cost estimates. Based on the axiomatic definition of uncertainty as the actual prediction error of the cost estimate, this paper provides a comprehensive overview of metrics used for the uncertainty quantification of cost estimates based on a literature review, an evaluation of publicly funded projects such as part of the CORDIS or Horizon 2020 programs, and an analysis of established approaches used by organizations such NASA, the U.S. Department of Defence, the ESA, and various commercial companies. The metrics are categorized based on their foundational character (foundations), their use in practice (state-of-practice), their availability for practice (state-of-art) and those suggested for future exploration (state-of-future). Insights gained were that a variety of uncertainty quantification metrics exist whose suitability depends on the volatility of available relevant information, as defined by technical and cost readiness level, and the number of whole product life cycle phases the estimate is intended to be valid for. Information volatility and number of whole product life cycle phases can hereby be considered as defining multi-dimensional probability fields admitting various uncertainty quantification metric families with identifiable thresholds for transitioning between them. The key research gaps identified were the lacking guidance grounded in theory for the selection of uncertainty quantification metrics and lacking practical alternatives to metrics based on the Central Limit Theorem. An innovative uncertainty quantification framework consisting of; a set-theory based typology, a data library, a classification system, and a corresponding input-output model are put forward to address this research gap as the basis for future work in this field.
2014-01-01
Background Interest in the impact of burnout on physicians has been growing because of the possible burden this may have on health care systems. The objective of this study is to estimate the cost of burnout on early retirement and reduction in clinical hours of practicing physicians in Canada. Methods Using an economic model, the costs related to early retirement and reduction in clinical hours of physicians were compared for those who were experiencing burnout against a scenario in which they did not experience burnout. The January 2012 Canadian Medical Association Masterfile was used to determine the number of practicing physicians. Transition probabilities were estimated using 2007–2008 Canadian Physician Health Survey and 2007 National Physician Survey data. Adjustments were also applied to outcome estimates based on ratio of actual to planned retirement and reduction in clinical hours. Results The total cost of burnout for all physicians practicing in Canada is estimated to be $213.1 million ($185.2 million due to early retirement and $27.9 million due to reduced clinical hours). Family physicians accounted for 58.8% of the burnout costs, followed by surgeons for 24.6% and other specialists for 16.6%. Conclusion The cost of burnout associated with early retirement and reduction in clinical hours is substantial and a significant proportion of practicing physicians experience symptoms of burnout. As health systems struggle with human resource shortages and expanding waiting times, this estimate sheds light on the extent to which the burden could be potentially decreased through prevention and promotion activities to address burnout among physicians. PMID:24927847
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colella, Whitney G.; Pilli, Siva Prasad
2015-06-01
The United States (U.S.) Department of Energy (DOE)’s Pacific Northwest National Laboratory (PNNL) is spearheading a program with industry to deploy and independently monitor five kilowatt-electric (kWe) combined heat and power (CHP) fuel cell systems (FCSs) in light commercial buildings. This publication discusses results from PNNL’s research efforts to independently evaluate manufacturer-stated engineering, economic, and environmental performance of these CHP FCSs at installation sites. The analysis was done by developing parameters for economic comparison of CHP installations. Key thermodynamic terms are first defined, followed by an economic analysis using both a standard accounting approach and a management accounting approach. Keymore » economic and environmental performance parameters are evaluated, including (1) the average per unit cost of the CHP FCSs per unit of power, (2) the average per unit cost of the CHP FCSs per unit of energy, (3) the change in greenhouse gas (GHG) and air pollution emissions with a switch from conventional power plants and furnaces to CHP FCSs; (4) the change in GHG mitigation costs from the switch; and (5) the change in human health costs related to air pollution. From the power perspective, the average per unit cost per unit of electrical power is estimated to span a range from $15–19,000/ kilowatt-electric (kWe) (depending on site-specific changes in installation, fuel, and other costs), while the average per unit cost of electrical and heat recovery power varies between $7,000 and $9,000/kW. From the energy perspective, the average per unit cost per unit of electrical energy ranges from $0.38 to $0.46/kilowatt-hour-electric (kWhe), while the average per unit cost per unit of electrical and heat recovery energy varies from $0.18 to $0.23/kWh. These values are calculated from engineering and economic performance data provided by the manufacturer (not independently measured data). The GHG emissions were estimated to decrease by one-third by shifting from a conventional energy system to a CHP FCS system. The GHG mitigation costs were also proportional to the changes in the GHG gas emissions. Human health costs were estimated to decrease significantly with a switch from a conventional system to a CHP FCS system.« less
Comparative evaluation of distributed-collector solar thermal electric power plants
NASA Technical Reports Server (NTRS)
Fujita, T.; El Gabalawi, N.; Herrera, G. G.; Caputo, R. S.
1978-01-01
Distributed-collector solar thermal-electric power plants are compared by projecting power plant economics of selected systems to the 1990-2000 timeframe. The approach taken is to evaluate the performance of the selected systems under the same weather conditions. Capital and operational costs are estimated for each system. Energy costs are calculated for different plant sizes based on the plant performance and the corresponding capital and maintenance costs. Optimum systems are then determined as the systems with the minimum energy costs for a given load factor. The optimum system is comprised of the best combination of subsystems which give the minimum energy cost for every plant size. Sensitivity analysis is done around the optimum point for various plant parameters.
NASA Astrophysics Data System (ADS)
Rougé, Charles; Harou, Julien J.; Pulido-Velazquez, Manuel; Matrosov, Evgenii S.
2017-04-01
The marginal opportunity cost of water refers to benefits forgone by not allocating an additional unit of water to its most economically productive use at a specific location in a river basin at a specific moment in time. Estimating the opportunity cost of water is an important contribution to water management as it can be used for better water allocation or better system operation, and can suggest where future water infrastructure could be most beneficial. Opportunity costs can be estimated using 'shadow values' provided by hydro-economic optimization models. Yet, such models' use of optimization means the models had difficulty accurately representing the impact of operating rules and regulatory and institutional mechanisms on actual water allocation. In this work we use more widely available river basin simulation models to estimate opportunity costs. This has been done before by adding in the model a small quantity of water at the place and time where the opportunity cost should be computed, then running a simulation and comparing the difference in system benefits. The added system benefits per unit of water added to the system then provide an approximation of the opportunity cost. This approximation can then be used to design efficient pricing policies that provide incentives for users to reduce their water consumption. Yet, this method requires one simulation run per node and per time step, which is demanding computationally for large-scale systems and short time steps (e.g., a day or a week). Besides, opportunity cost estimates are supposed to reflect the most productive use of an additional unit of water, yet the simulation rules do not necessarily use water that way. In this work, we propose an alternative approach, which computes the opportunity cost through a double backward induction, first recursively from outlet to headwaters within the river network at each time step, then recursively backwards in time. Both backward inductions only require linear operations, and the resulting algorithm tracks the maximal benefit that can be obtained by having an additional unit of water at any node in the network and at any date in time. Results 1) can be obtained from the results of a rule-based simulation using a single post-processing run, and 2) are exactly the (gross) benefit forgone by not allocating an additional unit of water to its most productive use. The proposed method is applied to London's water resource system to track the value of storage in the city's water supply reservoirs on the Thames River throughout a weekly 85-year simulation. Results, obtained in 0.4 seconds on a single processor, reflect the environmental cost of water shortage. This fast computation allows visualizing the seasonal variations of the opportunity cost depending on reservoir levels, demonstrating the potential of this approach for exploring water values and its variations using simulation models with multiple runs (e.g. of stochastically generated plausible future river inflows).
Starship Sails Propelled by Cost-Optimized Directed Energy
NASA Astrophysics Data System (ADS)
Benford, J.
Microwave and laser-propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability (`beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, beryllium, graphene, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail diameter and frequency. So optimal sails will be larger, lower in mass and driven by higher frequency beams. Estimated costs include economies of scale. We present several starship point concepts. Systems based on microwave, millimeter wave and laser technologies are of equal cost at today's costs. The frequency advantage of lasers is cancelled by the high cost of both the laser and the radiating optic. Cost of interstellar sailships is very high, driven by current costs for radiation source, antennas and especially electrical power. The high speeds necessary for fast interstellar missions make the operating cost exceed the capital cost. Such sailcraft will not be flown until the cost of electrical power in space is reduced orders of magnitude below current levels.
Zarkin, Gary A; Cowell, Alexander J; Hicks, Katherine A; Mills, Michael J; Belenko, Steven; Dunlap, Laura J; Houser, Kimberly A; Keyes, Vince
2012-06-01
Reflecting drug use patterns and criminal justice policies throughout the 1990s and 2000s, prisons hold a disproportionate number of society's drug abusers. Approximately 50% of state prisoners meet the criteria for a diagnosis of drug abuse or dependence, but only 10% receive medically based drug treatment. Because of the link between substance abuse and crime, treating substance abusing and dependent state prisoners while incarcerated has the potential to yield substantial economic benefits. In this paper, we simulate the lifetime costs and benefits of improving prison-based substance abuse treatment and post-release aftercare for a cohort of state prisoners. Our model captures the dynamics of substance abuse as a chronic disease; estimates the benefits of substance abuse treatment over individuals' lifetimes; and tracks the costs of crime and criminal justice costs related to policing, adjudication, and incarceration. We estimate net societal benefits and cost savings to the criminal justice system of the current treatment system and five policy scenarios. We find that four of the five policy scenarios provide positive net societal benefits and cost savings to the criminal justice system relative to the current treatment system. Our study demonstrates the societal gains to improving the drug treatment system for state prisoners. Copyright © 2011 John Wiley & Sons, Ltd.
ZARKIN, GARY A.; COWELL, ALEXANDER J.; HICKS, KATHERINE A.; MILLS, MICHAEL J.; BELENKO, STEVEN; DUNLAP, LAURA J.; HOUSER, KIMBERLY A.; KEYES, VINCE
2011-01-01
SUMMARY Reflecting drug use patterns and criminal justice policies throughout the 1990s and 2000s, prisons hold a disproportionate number of society’s drug abusers. Approximately 50% of state prisoners meet the criteria for a diagnosis of drug abuse or dependence, but only 10% receive medically based drug treatment. Because of the link between substance abuse and crime, treating substance abusing and dependent state prisoners while incarcerated has the potential to yield substantial economic benefits. In this paper, we simulate the lifetime costs and benefits of improving prison-based substance abuse treatment and post-release aftercare for a cohort of state prisoners. Our model captures the dynamics of substance abuse as a chronic disease; estimates the benefits of substance abuse treatment over individuals’ lifetimes; and tracks the costs of crime and criminal justice costs related to policing, adjudication, and incarceration. We estimate net societal benefits and cost savings to the criminal justice system of the current treatment system and five policy scenarios. We find that four of the five policy scenarios provide positive net societal benefits and cost savings to the criminal justice system relative to the current treatment system. Our study demonstrates the societal gains to improving the drug treatment system for state prisoners. PMID:21506193
Carbon dioxide capture from atmospheric air using sodium hydroxide spray.
Stolaroff, Joshuah K; Keith, David W; Lowry, Gregory V
2008-04-15
In contrast to conventional carbon capture systems for power plants and other large point sources, the system described in this paper captures CO2 directly from ambient air. This has the advantages that emissions from diffuse sources and past emissions may be captured. The objective of this research is to determine the feasibility of a NaOH spray-based contactor for use in an air capture system by estimating the cost and energy requirements per unit CO2 captured. A prototype system is constructed and tested to measure CO2 absorption, energy use, and evaporative water loss and compared with theoretical predictions. A numerical model of drop collision and coalescence is used to estimate operating parameters for a full-scale system, and the cost of operating the system per unit CO2 captured is estimated. The analysis indicates that CO2 capture from air for climate change mitigation is technically feasible using off-the-shelf technology. Drop coalescence significantly decreases the CO2 absorption efficiency; however, fan and pump energy requirements are manageable. Water loss is significant (20 mol H2O/mol CO2 at 15 degrees C and 65% RH) but can be lowered by appropriately designing and operating the system. The cost of CO2 capture using NaOH spray (excluding solution recovery and CO2 sequestration, which may be comparable) in the full-scale system is 96 $/ton-CO2 in the base case, and ranges from 53 to 127 $/ton-CO2 under alternate operating parameters and assumptions regarding capital costs and mass transfer rate. The low end of the cost range is reached by a spray with 50 microm mean drop diameter, which is achievable with commercially available spray nozzles.
Improving The Discipline of Cost Estimation and Analysis
NASA Technical Reports Server (NTRS)
Piland, William M.; Pine, David J.; Wilson, Delano M.
2000-01-01
The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.
Space transfer vehicle concepts and requirements. Volume 3: Program cost estimates
NASA Technical Reports Server (NTRS)
1991-01-01
The Space Transfer Vehicle (STV) Concepts and Requirements Study has been an eighteen-month study effort to develop and analyze concepts for a family of vehicles to evolve from an initial STV system into a Lunar Transportation System (LTS) for use with the Heavy Lift Launch Vehicle (HLLV). The study defined vehicle configurations, facility concepts, and ground and flight operations concepts. This volume reports the program cost estimates results for this portion of the study. The STV Reference Concept described within this document provides a complete LTS system that performs both cargo and piloted Lunar missions.
Forecasting the future burden of opioids for osteoarthritis.
Ackerman, I N; Zomer, E; Gilmartin-Thomas, J F-M; Liew, D
2018-03-01
To quantify the current national burden of opioids for osteoarthritis (OA) pain in Australia in terms of number of dispensed opioid prescriptions and associated costs, and to forecast the likely burden to the year 2030/31. Epidemiological modelling. Published data were obtained on rates of opioid prescribing for people with OA and national OA prevalence projections. Trends in opioid dispensing from 2006 to 2016, and average costs for common opioid subtypes were obtained from the Pharmaceutical Benefits Scheme and Medicare Australia Statistics. Using these inputs, a model was developed to estimate the likely number of dispensed opioid prescriptions and costs to the public healthcare system by 2030/31. In 2015/16, an estimated 1.1 million opioid prescriptions were dispensed in Australia for 403,954 people with OA (of a total 2.2 million Australians with OA). Based on recent dispensing trends and OA prevalence projections, the number of dispensed opioid prescriptions is expected to nearly triple to 3,032,332 by 2030/31, for an estimated 562,610 people with OA. The estimated cost to the Australian healthcare system was $AUD25.2 million in 2015/16, rising to $AUD72.4 million by 2030/31. OA-related opioid dispensing and associated costs are set to increase substantially in Australia from 2015/16 to 2030/31. Use of opioids for OA pain is concerning given joint disease chronicity and the risk of adverse events, particularly among older people. These projections represent a conservative estimate of the full financial burden given additional costs associated with opioid-related harms and out-of-pocket costs borne by patients. Copyright © 2017 Osteoarthritis Research Society International. Published by Elsevier Ltd. All rights reserved.
MESSOC capabilities and results. [Model for Estimating Space Station Opertions Costs
NASA Technical Reports Server (NTRS)
Shishko, Robert
1990-01-01
MESSOC (Model for Estimating Space Station Operations Costs) is the result of a multi-year effort by NASA to understand and model the mature operations cost of Space Station Freedom. This paper focuses on MESSOC's ability to contribute to life-cycle cost analyses through its logistics equations and databases. Together, these afford MESSOC the capability to project not only annual logistics costs for a variety of Space Station scenarios, but critical non-cost logistics results such as annual Station maintenance crewhours, upweight/downweight, and on-orbit sparing availability as well. MESSOC results using current logistics databases and baseline scenario have already shown important implications for on-orbit maintenance approaches, space transportation systems, and international operations cost sharing.
Water Misting and Injection of Commercial Aircraft Engines to Reduce Airport NOx
NASA Technical Reports Server (NTRS)
Daggett, David L.; Hendricks, Robert C. (Technical Monitor)
2004-01-01
This report provides the first high level look at system design, airplane performance, maintenance, and cost implications of using water misting and water injection technology in aircraft engines for takeoff and climb-out NOx emissions reduction. With an engine compressor inlet water misting rate of 2.2 percent water-to-air ratio, a 47 percent NOx reduction was calculated. Combustor water injection could achieve greater reductions of about 85 percent, but with some performance penalties. For the water misting system on days above 59 F, a fuel efficiency benefit of about 3.5 percent would be experienced. Reductions of up to 436 F in turbine inlet temperature were also estimated, which could lead to increased hot section life. A 0.61 db noise reduction will occur. A nominal airplane weight penalty of less than 360 lb (no water) was estimated for a 305 passenger airplane. The airplane system cost is initially estimated at $40.92 per takeoff giving an attractive NOx emissions reduction cost/benefit ratio of about $1,663/ton.
NASA Technical Reports Server (NTRS)
Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.
1973-01-01
The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.
The importance of operations, risk, and cost assessment to space transfer systems design
NASA Technical Reports Server (NTRS)
Ball, J. M.; Komerska, R. J.; Rowell, L. F.
1992-01-01
This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.
Auerbach, H; Schreyögg, J; Busse, R
2006-01-01
The purpose of this study is to assess the cost-effectiveness (net costs per life year gained) of telemedical devices for pre-clinical traffic accident emergency rescue in Germany. Two equipment versions of a telemedical device are compared from a societal perspective with the baseline in Germany, i.e. the non-application of telemedicine in emergency rescues. The analysis is based on retrospective statistical data covering a period of 10 years with discounted costs not adjusted for inflation. Due to the uncertainty of data, certain assumptions and estimates were necessary. The outcome is measured in terms of "life years gained" by reducing therapy-free intervals and improvements in first-aid provided by laypersons. The introduction of the basic equipment version, "Automatic Accident Alert", is associated with net costs per life year gained of euro 247,977 (at baseline assumptions). The full equipment version of the telemedical device would lead to estimated net costs of euro 239,524 per life year gained. Multi-way sensitivity-analysis with best and worst case scenarios suggests that decreasing system costs would disproportionately reduce total costs, and that rapid market penetration would largely increase the system's benefit, while simultaneously reducing costs. The net costs per life year gained in the application of the two versions of the telemedical device for pre-clinical emergency rescue of traffic accidents are estimated as quite high. However, the implementation of the device as part of a larger European co-ordinated initiative is more realistic.
Hospital costs estimation and prediction as a function of patient and admission characteristics.
Ramiarina, Robert; Almeida, Renan Mvr; Pereira, Wagner Ca
2008-01-01
The present work analyzed the association between hospital costs and patient admission characteristics in a general public hospital in the city of Rio de Janeiro, Brazil. The unit costs method was used to estimate inpatient day costs associated to specific hospital clinics. With this aim, three "cost centers" were defined in order to group direct and indirect expenses pertaining to the clinics. After the costs were estimated, a standard linear regression model was developed for correlating cost units and their putative predictors (the patients gender and age, the admission type (urgency/elective), ICU admission (yes/no), blood transfusion (yes/no), the admission outcome (death/no death), the complexity of the medical procedures performed, and a risk-adjustment index). Data were collected for 3100 patients, January 2001-January 2003. Average inpatient costs across clinics ranged from (US$) 1135 [Orthopedics] to 3101 [Cardiology]. Costs increased according to increases in the risk-adjustment index in all clinics, and the index was statistically significant in all clinics except Urology, General surgery, and Clinical medicine. The occupation rate was inversely correlated to costs, and age had no association with costs. The (adjusted) per cent of explained variance varied between 36.3% [Clinical medicine] and 55.1% [Thoracic surgery clinic]. The estimates are an important step towards the standardization of hospital costs calculation, especially for countries that lack formal hospital accounting systems.
Toward an affordable and user-friendly visual motion capture system.
Bonnet, V; Sylla, N; Cherubini, A; Gonzáles, A; Azevedo Coste, C; Fraisse, P; Venture, G
2014-01-01
The present study aims at designing and evaluating a low-cost, simple and portable system for arm joint angle estimation during grasping-like motions. The system is based on a single RGB-D camera and three customized markers. The automatically detected and tracked marker positions were used as inputs to an offline inverse kinematic process based on bio-mechanical constraints to reduce noise effect and handle marker occlusion. The method was validated on 4 subjects with different motions. The joint angles were estimated both with the proposed low-cost system and, a stereophotogrammetric system. Comparative analysis shows good accuracy with high correlation coefficient (r= 0.92) and low average RMS error (3.8 deg).
DOT National Transportation Integrated Search
2006-07-01
The purpose of this report, "Working Paper National Costs of the Metropolitan ITS Infrastructure: Updated with 2005 Deployment Data," is to update the estimates of the costs remaining to fully deploy Intelligent Transportation Systems (ITS) infrastru...
New Approaches in Reusable Booster System Life Cycle Cost Modeling
NASA Technical Reports Server (NTRS)
Zapata, Edgar
2013-01-01
This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.
New Approaches in Reuseable Booster System Life Cycle Cost Modeling
NASA Technical Reports Server (NTRS)
Zapata, Edgar
2013-01-01
This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.
DOE Office of Scientific and Technical Information (OSTI.GOV)
University of California, Berkeley; Wei, Max; Lipman, Timothy
2014-06-23
A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kWmore » level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.« less
Cost-effectiveness of community-based practitioner programmes in Ethiopia, Indonesia and Kenya.
McPake, Barbara; Edoka, Ijeoma; Witter, Sophie; Kielmann, Karina; Taegtmeyer, Miriam; Dieleman, Marjolein; Vaughan, Kelsey; Gama, Elvis; Kok, Maryse; Datiko, Daniel; Otiso, Lillian; Ahmed, Rukhsana; Squires, Neil; Suraratdecha, Chutima; Cometto, Giorgio
2015-09-01
To assess the cost-effectiveness of community-based practitioner programmes in Ethiopia, Indonesia and Kenya. Incremental cost-effectiveness ratios for the three programmes were estimated from a government perspective. Cost data were collected for 2012. Life years gained were estimated based on coverage of reproductive, maternal, neonatal and child health services. For Ethiopia and Kenya, estimates of coverage before and after the implementation of the programme were obtained from empirical studies. For Indonesia, coverage of health service interventions was estimated from routine data. We used the Lives Saved Tool to estimate the number of lives saved from changes in reproductive, maternal, neonatal and child health-service coverage. Gross domestic product per capita was used as the reference willingness-to-pay threshold value. The estimated incremental cost per life year gained was 82 international dollars ($)in Kenya, $999 in Ethiopia and $3396 in Indonesia. The results were most sensitive to uncertainty in the estimates of life-years gained. Based on the results of probabilistic sensitivity analysis, there was greater than 80% certainty that each programme was cost-effective. Community-based approaches are likely to be cost-effective for delivery of some essential health interventions where community-based practitioners operate within an integrated team supported by the health system. Community-based practitioners may be most appropriate in rural poor communities that have limited access to more qualified health professionals. Further research is required to understand which programmatic design features are critical to effectiveness.
High Pressure Electrolyzer System Evaluation
NASA Technical Reports Server (NTRS)
Prokopius, Kevin; Coloza, Anthony
2010-01-01
This report documents the continuing efforts to evaluate the operational state of a high pressure PEM based electrolyzer located at the NASA Glenn Research Center. This electrolyzer is a prototype system built by General Electric and refurbished by Hamilton Standard (now named Hamilton Sunstrand). It is capable of producing hydrogen and oxygen at an output pressure of 3000 psi. The electrolyzer has been in storage for a number of years. Evaluation and testing was performed to determine the state of the electrolyzer and provide an estimate of the cost for refurbishment. Pressure testing was performed using nitrogen gas through the oxygen ports to ascertain the status of the internal membranes and seals. It was determined that the integrity of the electrolyzer stack was good as there were no appreciable leaks in the membranes or seals within the stack. In addition to the integrity testing, an itemized list and part cost estimate was produced for the components of the electrolyzer system. An evaluation of the system s present state and an estimate of the cost to bring it back to operational status was also produced.
Florence, Curtis S; Zhou, Chao; Luo, Feijun; Xu, Likang
2016-10-01
It is important to understand the magnitude and distribution of the economic burden of prescription opioid overdose, abuse, and dependence to inform clinical practice, research, and other decision makers. Decision makers choosing approaches to address this epidemic need cost information to evaluate the cost effectiveness of their choices. To estimate the economic burden of prescription opioid overdose, abuse, and dependence from a societal perspective. Incidence of fatal prescription opioid overdose from the National Vital Statistics System, prevalence of abuse and dependence from the National Survey of Drug Use and Health. Fatal data are for the US population, nonfatal data are a nationally representative sample of the US civilian noninstitutionalized population ages 12 and older. Cost data are from various sources including health care claims data from the Truven Health MarketScan Research Databases, and cost of fatal cases from the WISQARS (Web-based Injury Statistics Query and Reporting System) cost module. Criminal justice costs were derived from the Justice Expenditure and Employment Extracts published by the Department of Justice. Estimates of lost productivity were based on a previously published study. Calendar year 2013. Monetized burden of fatal overdose and abuse and dependence of prescription opioids. The total economic burden is estimated to be $78.5 billion. Over one third of this amount is due to increased health care and substance abuse treatment costs ($28.9 billion). Approximately one quarter of the cost is borne by the public sector in health care, substance abuse treatment, and criminal justice costs. These estimates can assist decision makers in understanding the magnitude of adverse health outcomes associated with prescription opioid use such as overdose, abuse, and dependence.
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...
75 FR 38187 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... the Accelerated Cost Recovery System (Sec. 1.168(i)-1). DATES: Written comments should be received on... . SUPPLEMENTARY INFORMATION: Title: General Asset Accounts under the Accelerated Cost Recovery System. OMB Number... approved collection. Affected Public: Business or other for-profit organizations and Farms. Estimated...
2012-01-01
Background Obesity is a major global epidemic and a burden to society and health systems. It is well known risk factor for a number of chronic medical conditions with high morbidity and mortality. This study aimed to provide an estimate of the direct costs associated to outpatient and inpatient care of overweight and obesity related diseases in the perspective of the Brazilian Health System (SUS). Methods Population attributable risk (PAR) was calculated for selected diseases related to overweight and obesity and with the following parameters: Relative risk (RR) ≥ 1.20 or RR ≥1.10 and < 1.20, but important problem of public health due its high prevalence. After a broad search in the literature, two meta-analysis were selected to provide RR for PAR calculation. The prevalence rates of overweight and obesity in Brazilians with ≥18 years were obtained from large national survey. The national health database (DATASUS) was used to estimate the annual cost of the Brazilian Unified Health System (SUS) with the diseases included in the analysis. The extracted values were stratified by sex, type of service (inpatient or outpatient care) and year. Data were collected from 2008 to 2010 and the results reflect the average of 3 years. Brazilian costs were converted into US dollars during the analysis using a purchasing power parity basis (2010). Results The estimated total costs in one year with all diseases related to overweight and obesity are US$ 2,1 billion; US$ 1,4 billion (68.4% of total costs) due to hospitalizations and US$ 679 million due to ambulatory procedures. Approximately 10% of these cost is attributable to overweight and obesity. Conclusion The results confirm that overweight and obesity carry a great economic burden for Brazilian health system and for the society. The knowledge of these costs will be useful for future economic analysis of preventive and treatment interventions. PMID:22713624
NASA Technical Reports Server (NTRS)
Levak, Daniel
1993-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.
ERIC Educational Resources Information Center
Palmer, Crescentia
A comparison of costs for computer-based searching of Psychological Abstracts and Educational Resources Information Center (ERIC) systems by the New York State Library at Albany was produced by combining data available from search request forms and from bills from the contract subscription service, the State University of New…
Cost effectiveness analysis of a smoke alarm giveaway program in Oklahoma City, Oklahoma.
Haddix, A C; Mallonee, S; Waxweiler, R; Douglas, M R
2001-12-01
To estimate the cost effectiveness of the Lifesavers Residential Fire and Injury Prevention Program (LRFIPP), a smoke alarm giveaway program. In 1990, the LRFIPP distributed over 10,000 smoke alarms in an area of Oklahoma City at high risk for residential fire injuries. The program also included fire prevention education and battery replacement components. A cost effectiveness analysis was conducted from the societal and health care systems perspectives. The study compared program costs with the total costs of medical treatment and productivity losses averted over a five year period. Fatal and non-fatal residential fire related injuries prevented were estimated from surveillance data. Medical costs were obtained from chart reviews of patients with fire related injuries that occurred during the pre-intervention period. During the five years post-intervention, it is estimated that the LRFIPP prevented 20 fatal and 24 non-fatal injuries. From the societal perspective, the total discounted cost of the program was $531,000. Total discounted net savings exceeded $15 million. From the health care system perspective, the total discounted net savings were almost $1 million and would have a net saving even if program effectiveness was reduced by 64%. The program was effective in reducing fatal and non-fatal residential fire related injuries and was cost saving. Similar programs in other high risk areas would be good investments even if program effectiveness was lower than that achieved by the LRFIPP.
Compile-time estimation of communication costs in multicomputers
NASA Technical Reports Server (NTRS)
Gupta, Manish; Banerjee, Prithviraj
1991-01-01
An important problem facing numerous research projects on parallelizing compilers for distributed memory machines is that of automatically determining a suitable data partitioning scheme for a program. Any strategy for automatic data partitioning needs a mechanism for estimating the performance of a program under a given partitioning scheme, the most crucial part of which involves determining the communication costs incurred by the program. A methodology is described for estimating the communication costs at compile-time as functions of the numbers of processors over which various arrays are distributed. A strategy is described along with its theoretical basis, for making program transformations that expose opportunities for combining of messages, leading to considerable savings in the communication costs. For certain loops with regular dependences, the compiler can detect the possibility of pipelining, and thus estimate communication costs more accurately than it could otherwise. These results are of great significance to any parallelization system supporting numeric applications on multicomputers. In particular, they lay down a framework for effective synthesis of communication on multicomputers from sequential program references.
Prinja, Shankar; Gupta, Aditi; Verma, Ramesh; Bahuguna, Pankaj; Kumar, Dinesh; Kaur, Manmeet; Kumar, Rajesh
2016-01-01
With the commitment of the national government to provide universal healthcare at cheap and affordable prices in India, public healthcare services are being strengthened in India. However, there is dearth of cost data for provision of health services through public system like primary & community health centres. In this study, we aim to bridge this gap in evidence by assessing the total annual and per capita cost of delivering the package of health services at PHC and CHC level. Secondly, we determined the per capita cost of delivering specific health services like cost per antenatal care visit, per institutional delivery, per outpatient consultation, per bed-day hospitalization etc. We undertook economic costing of fourteen public health facilities (seven PHCs and CHCs each) in three North-Indian states viz., Haryana, Himachal Pradesh and Punjab. Bottom-up costing method was adopted for collection of data on all resources spent on delivery of health services in selected health facilities. Analysis was undertaken using a health system perspective. The joint costs like human resource, capital, and equipment were apportioned as per the time value spent on a particular service. Capital costs were discounted and annualized over the estimated life of the item. Mean annual costs and unit costs were estimated along with their 95% confidence intervals using bootstrap methodology. The overall annual cost of delivering services through public sector primary and community health facilities in three states of north India were INR 8.8 million (95% CI: 7,365,630-10,294,065) and INR 26.9 million (95% CI: 22,225,159.3-32,290,099.6), respectively. Human resources accounted for more than 50% of the overall costs at both the level of PHCs and CHCs. Per capita per year costs for provision of complete package of preventive, curative and promotive services at PHC and CHC were INR 170.8 (95% CI: 131.6-208.3) and INR162.1 (95% CI: 112-219.1), respectively. The study estimates can be used for financial planning of scaling up of similar health services in the urban areas under the aegis of National Health Mission. The estimates would be also useful in undertaking equity analysis and full economic evaluations of the health systems.
Gupta, Aditi; Verma, Ramesh; Bahuguna, Pankaj; Kumar, Dinesh; Kaur, Manmeet; Kumar, Rajesh
2016-01-01
Background With the commitment of the national government to provide universal healthcare at cheap and affordable prices in India, public healthcare services are being strengthened in India. However, there is dearth of cost data for provision of health services through public system like primary & community health centres. In this study, we aim to bridge this gap in evidence by assessing the total annual and per capita cost of delivering the package of health services at PHC and CHC level. Secondly, we determined the per capita cost of delivering specific health services like cost per antenatal care visit, per institutional delivery, per outpatient consultation, per bed-day hospitalization etc. Methods We undertook economic costing of fourteen public health facilities (seven PHCs and CHCs each) in three North-Indian states viz., Haryana, Himachal Pradesh and Punjab. Bottom-up costing method was adopted for collection of data on all resources spent on delivery of health services in selected health facilities. Analysis was undertaken using a health system perspective. The joint costs like human resource, capital, and equipment were apportioned as per the time value spent on a particular service. Capital costs were discounted and annualized over the estimated life of the item. Mean annual costs and unit costs were estimated along with their 95% confidence intervals using bootstrap methodology. Results The overall annual cost of delivering services through public sector primary and community health facilities in three states of north India were INR 8.8 million (95% CI: 7,365,630–10,294,065) and INR 26.9 million (95% CI: 22,225,159.3–32,290,099.6), respectively. Human resources accounted for more than 50% of the overall costs at both the level of PHCs and CHCs. Per capita per year costs for provision of complete package of preventive, curative and promotive services at PHC and CHC were INR 170.8 (95% CI: 131.6–208.3) and INR162.1 (95% CI: 112–219.1), respectively. Conclusion The study estimates can be used for financial planning of scaling up of similar health services in the urban areas under the aegis of National Health Mission. The estimates would be also useful in undertaking equity analysis and full economic evaluations of the health systems. PMID:27536781
Comparing Costs of Traditional and Specialty Probation for People With Serious Mental Illness.
Skeem, Jennifer L; Montoya, Lina; Manchak, Sarah M
2018-05-15
Specialty mental health probation reduces the likelihood of rearrest for people with mental illness, who are overrepresented in the justice system. This study tested whether specialty probation was associated with lower costs than traditional probation during the two years after placement in probation. A longitudinal, matched study compared costs of behavioral health care and criminal justice contacts among 359 probationers with mental illness at prototypic specialty or traditional agencies. Compared with traditional officers, specialty officers supervised smaller caseloads, established better relationships with supervisees, and participated more in treatment. Participants and officers were interviewed, and administrative databases were integrated to capture service use and criminal justice contacts. Unit costs were attached to these data to estimate costs incurred by each participant over two years. Cost differences were estimated by using machine-learning algorithms combined with targeted maximum-likelihood estimation (TMLE), a double-robust estimator that accounts for associations between confounders and both treatment assignment and outcomes. Specialty probation cost $11,826 (p<.001) less per participant than traditional probation, with overall savings of about 51%. Specialty and traditional probation did not differ in criminal justice costs because the additional costs for supervision of specialty caseloads were offset by reduced recidivism. However, for behavioral health care, specialty probation cost an estimated $14,049 (p<.001) less per client than traditional probation. Greater outpatient costs were more than offset by reduced emergency, inpatient, and residential costs. Well-implemented specialty probation yielded substantial savings-and should be considered in justice reform efforts for people with mental illness.
PARVCOST : a particleboard variable cost program
Peter J. Ince; George B. Harpole
1977-01-01
PARVCOST, a FORTRAN program, was designed to develop economic and financial analyses of systems for manufacturing particleboard. In the program, costs and requirements of wood are calculated as are chemicals and energy per unit of finished board products. Estimates are made of sensitivity of the finished product costs to changes in unit costs of energy and raw...
Energy Analysis of Offshore Systems | Wind | NREL
successful research to understand and improve the cost of wind generation technology. As a research approaches used to estimate direct and indirect economic impacts of offshore wind. Chart of cost data for report on cost trends. Recent studies include: Analysis of capital cost trends for planned and installed
Attrition Cost Model Instruction Manual
ERIC Educational Resources Information Center
Yanagiura, Takeshi
2012-01-01
This instruction manual explains in detail how to use the Attrition Cost Model program, which estimates the cost of student attrition for a state's higher education system. Programmed with SAS, this model allows users to instantly calculate the cost of attrition and the cumulative attrition rate that is based on the most recent retention and…
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Cost of money. 1631.205-10... AND PROCEDURES Contracts With Commercial Organizations 1631.205-10 Cost of money. For the purposes of FAR 31.205-10(b)(3), the estimated facilities capital cost of money is specifically identified if it...
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Cost of money. 1631.205-10... AND PROCEDURES Contracts With Commercial Organizations 1631.205-10 Cost of money. For the purposes of FAR 31.205-10(b)(3), the estimated facilities capital cost of money is specifically identified if it...
NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.
NASA Astrophysics Data System (ADS)
Gates, W. R.
1983-02-01
Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.
NASA Technical Reports Server (NTRS)
Gates, W. R.
1983-01-01
Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.
NREL Screens Universities for Solar and Battery Storage Potential
DOE Office of Scientific and Technical Information (OSTI.GOV)
In support of the U.S. Department of Energy's SunShot initiative, NREL provided solar photovoltaic (PV) screenings in 2016 for eight universities seeking to go solar. NREL conducted an initial technoeconomic assessment of PV and storage feasibility at the selected universities using the REopt model, an energy planning platform that can be used to evaluate RE options, estimate costs, and suggest a mix of RE technologies to meet defined assumptions and constraints. NREL provided each university with customized results, including the cost-effectiveness of PV and storage, recommended system size, estimated capital cost to implement the technology, and estimated life cycle costmore » savings.« less
Cost-Conscious of Anesthesia Physicians: An awareness survey.
Hakimoglu, Sedat; Hancı, Volkan; Karcıoglu, Murat; Tuzcu, Kasım; Davarcı, Isıl; Kiraz, Hasan Ali; Turhanoglu, Selim
2015-01-01
Increasing competitive pressure and health performance system in the hospitals result in pressure to reduce the resources allocated. The aim of this study was to evaluate the anesthesiology and intensive care physicians awareness of the cost of the materials used and to determine the factors that influence it. This survey was conducted between September 2012 and September 2013 after the approval of the local ethics committee. Overall 149 anesthetists were included in the study. Participants were asked to estimate the cost of 30 products used by anesthesiology and intensive care units. One hundred forty nine doctors, 45% female and 55% male, participated in this study. Of the total 30 questions the averages of cost estimations were 5.8% accurate estimation, 35.13% underestimation and 59.16% overestimation. When the participants were divided into the different groups of institution, duration of working in this profession and sex, there were no statistically significant differences regarding accurate estimation. However, there was statistically significant difference in underestimation. In underestimation, there was no significant difference between 16-20 year group and >20 year group but these two groups have more price overestimation than the other groups (p=0.031). Furthermore, when all the participants were evaluated there were no significant difference between age-accurate cost estimation and profession time-accurate cost estimation. Anesthesiology and intensive care physicians in this survey have an insufficient awareness of the cost of the drugs and materials that they use. The institution and experience are not effective factors for accurate estimate. Programs for improving the health workers knowledge creating awareness of cost should be planned in order to use the resources more efficiently and cost effectively.
Etcheverrigaray, F; Bulteau, S; Machon, L O; Riche, V P; Mauduit, N; Tricot, R; Sellal, O; Sauvaget, A
2015-08-01
Repetitive transcranial magnetic stimulation (rTMS) is an effective and well-tolerated treatment in resistant depression with mild to moderate intensity. This indication has not yet been approved in France. The cost and medico-economic value of rTMS in psychiatry remains unknown. The aim of this preliminary study was to assess rTMS cost production analysis as an in-hospital treatment for depression. The methodology, derived from analytical accounts, was validated by a multidisciplinary task force (clinicians, public health doctors, pharmacists, administrative officials and health economist). It was pragmatic, based on official and institutional documentary sources and from field practice. It included equipment, staff, and structure costs, to get an estimate as close to reality as possible. First, we estimated the production cost of rTMS session, based on our annual activity. We then estimated the cost of a cure, which includes 15 sessions. A sensitivity analysis was also performed. The hospital production cost of a cure for treating depression was estimated at € 1932.94 (€ 503.55 for equipment, € 1082.75 for the staff, and € 346.65 for structural expenses). This cost-estimate has resulted from an innovative, pragmatic, and cooperative approach. It is slightly higher but more comprehensive than the costs estimated by the few international studies. However, it is limited due to structure-specific problems and activity. This work could be repeated in other circumstances in order to obtain a more general estimate, potentially helpful for determining an official price for the French health care system. Moreover, budgetary constraints and public health choices should be taken into consideration. Copyright © 2015 Elsevier Masson SAS. All rights reserved.
Verloock, Leen; Joseph, Wout; Gati, Azeddine; Varsier, Nadège; Flach, Björn; Wiart, Joe; Martens, Luc
2013-06-01
An experimental validation of a low-cost method for extrapolation and estimation of the maximal electromagnetic-field exposure from long-term evolution (LTE) radio base station installations are presented. No knowledge on downlink band occupation or service characteristics is required for the low-cost method. The method is applicable in situ. It only requires a basic spectrum analyser with appropriate field probes without the need of expensive dedicated LTE decoders. The method is validated both in laboratory and in situ, for a single-input single-output antenna LTE system and a 2×2 multiple-input multiple-output system, with low deviations in comparison with signals measured using dedicated LTE decoders.
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
77 FR 65607 - Internal Revenue Service
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... Form 720 returns a systemic way to order additional tax forms and informational publications. Current... forms of information technology; and (e) estimates of capital or start-up costs and costs of operation...
Determination of VA health care costs.
Barnett, Paul G
2003-09-01
In the absence of billing data, alternative methods are used to estimate the cost of hospital stays, outpatient visits, and treatment innovations in the U.S. Department of Veterans Affairs (VA). The choice of method represents a trade-off between accuracy and research cost. The direct measurement method gathers information on staff activities, supplies, equipment, space, and workload. Since it is expensive, direct measurement should be reserved for finding short-run costs, evaluating provider efficiency, or determining the cost of treatments that are innovative or unique to VA. The pseudo-bill method combines utilization data with a non-VA reimbursement schedule. The cost regression method estimates the cost of VA hospital stays by applying the relationship between cost and characteristics of non-VA hospitalizations. The Health Economics Resource Center uses pseudo-bill and cost regression methods to create an encounter-level database of VA costs. Researchers are also beginning to use the VA activity-based cost allocation system.
Land Application of Wastes: An Educational Program. Costing Land Application Systems - Module 10.
ERIC Educational Resources Information Center
Clarkson, W. W.; And Others
This module expands on the concepts of cost estimation and comparison of costs among various treatment alternatives which were presented in a previous module. The need for useful published cost data is stressed. Criteria for selecting cost references are presented, and examples of charts and graphs from several of these are used in comparing land…
Learning/cost-improvement curves
NASA Technical Reports Server (NTRS)
Delionback, L. M.
1976-01-01
Review guide is an aid to manager or engineer who must determine production costs for components, systems, or services. Methods are described by which manufacturers may use historical data, task characteristics, and current cost data to estimate unit prices as function of number of units to be produced.
de Oliveira, Claire; Bremner, Karen E; Liu, Ning; Greenberg, Mark L; Nathan, Paul C; McBride, Mary L; Krahn, Murray D
2017-03-01
Childhood and adolescent cancers are uncommon, but they have important economic and health impacts on patients, families, and health care systems. Few studies have measured the economic burden of care for childhood and adolescent cancers. To estimate costs of cancer care in population-based cohorts of children and adolescents from the public payer perspective. We identified patients with cancer, aged 91 days to 19 years, diagnosed from 1995 to 2009 using cancer registry data, and matched each to three noncancer controls. Using linked administrative health care records, we estimated total and net resource-specific costs (in 2012 Canadian dollars) during 90 days prediagnosis and 1 year postdiagnosis. Children (≤14 years old) numbered 4,396: 36% had leukemia, 21% central nervous system tumors, 10% lymphoma, and 33% other cancers. Adolescents (15-19 years old) numbered 2,329: 28.9% had lymphoma. Bone and soft tissue sarcoma, germ cell tumor, and thyroid carcinoma each comprised 12% to 13%. Mean net prediagnosis costs were $5,810 and $1,127 and mean net postdiagnosis costs were $136,413 and $62,326 for children and adolescents, respectively; the highest were for leukemia ($157,764 for children and $172,034 for adolescents). In both cohorts, costs were much higher for patients who died within 1 year of diagnosis. Inpatient hospitalization represented 69% to 74% of postdiagnosis costs. Treating children with cancer is costly, more costly than treating adolescents or adults. Substantial survival gains in children mean that treatment may still be very cost-effective. Comprehensive age-specific population-based cost estimates are essential to reliably assess the cost-effectiveness of cancer care for children and adolescents, and measure health system performance. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.
Rosenheck, Robert; Doyle, Jefferson; Leslie, Douglas; Fontana, Alan
2003-01-01
This article examines the ways in which changes in the treatment environment and in measurement perspectives can affect the evaluation of cost-effectiveness of new medications. In three studies we reexamined data from a clinical trial of haloperidol and clozapine conducted from 1993 to 1996. The results of the studies are as follows: Study 1 found that clozapine treatment was associated with significantly reduced inpatient costs, and increased outpatient costs, suggesting that as systems use less inpatient care and more outpatient care, more effective medications may increase, rather than decrease, costs in sicker patients. Study 2 found that while provider assessments and standard measures favored clozapine over haloperidol, patient responses showed little evidence of a clinical advantage for clozapine and a less favorable side-effect profile. Study 3 found that while annual drug costs in the published trial were estimated to be dollars 4,545 for a full year of clozapine treatment, atypical antipsychotic costs in 2000 were estimated to range from dollars 1,254 to dollars 3,016 in the Department of Veterans Affairs system, and from dollars 2,221 to dollars 8,147 in the private sector. In conclusion, cost-effectiveness, as evaluated in studies like CATIE, will increasingly need to be tied to service system contingencies, environments, and evaluation perspectives.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.
This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... for disagreeing. (3) The Contracting Officer will evaluate the Contractor's response and notify the...
NASA Astrophysics Data System (ADS)
Bell, Kevin D.; Dafesh, Philip A.; Hsu, L. A.; Tsuda, A. S.
1995-12-01
Current architectural and design trade techniques often carry unaffordable alternatives late into the decision process. Early decisions made during the concept exploration and development (CE&D) phase will drive the cost of a program more than any other phase of development; thus, designers must be able to assess both the performance and cost impacts of their early choices. The Space Based Infrared System (SBIRS) cost engineering model (CEM) described in this paper is an end-to-end process integrating engineering and cost expertise through commonly available spreadsheet software, allowing for concurrent design engineering and cost estimation to identify and balance system drives to reduce acquisition costs. The automated interconnectivity between subsystem models using spreadsheet software allows for the quick and consistent assessment of the system design impacts and relative cost impacts due to requirement changes. It is different from most CEM efforts attempted in the past as it incorporates more detailed spacecraft and sensor payload models, and has been applied to determine the cost drivers for an advanced infrared satellite system acquisition. The CEM is comprised of integrated detailed engineering and cost estimating relationships describing performance, design, and cost parameters. Detailed models have been developed to evaluate design parameters for the spacecraft bus and sensor; both step-starer and scanner sensor types incorporate models of focal plane array, optics, processing, thermal, communications, and mission performance. The current CEM effort has provided visibility to requirements, design, and cost drivers for system architects and decision makers to determine the configuration of an infrared satellite architecture that meets essential requirements cost effectively. In general, the methodology described in this paper consists of process building blocks that can be tailored to the needs of many applications. Descriptions of the spacecraft and payload subsystem models provide insight into The Aerospace Corporation expertise and scope of the SBIRS concept development effort.
Kawalec, Paweł P; Malinowski, Krzysztof P
2015-01-01
Systemic lupus erythematosus, systemic sclerosis and sarcoidosis are three different autoimmune systemic diseases that generate a significant burden to society due to treatment costs and also those caused by a work disability or absenteeism among patients. Relevant 2012 data referring to the three components of absenteeism produced by autoimmune systemic diseases, sick leave, short-term and long-term work disability, were obtained from the Social Insurance Institution in Poland (PSII). By applying the Human Capital Approach using gross domestic product per capita, gross value added per worker and gross income per worker in 2012, total indirect costs for the diseases were calculated. All costs were presented in euros and were valid for 2012. The PSII recorded 1600 patients with systemic lupus erythematosus, 500 patients with systemic sclerosis and 2700 patients with sarcoidosis in the 2012 - total indirect costs were as high as 7,260,595, 2,268,571 and 4,027,575 EUR, respectively. Costs were estimated using gross domestic product per capita; 17,485,412, 5,463,312 and 9,699,455 EUR, accordingly, calculated using gross value added per worker and 5,346,933, 1,670,648 and 2,966,034 EUR estimated using gross income per worker, respectively. Considering only data on absenteeism gathered by the PSII we can conclude that the three autoimmune systemic diseases bore great indirect costs. Their social burden for Poland could be even greater when considering presenteeism as well as other components of absenteeism such as loss of unpaid work, a gray economy or loss of leisure time.
Study to establish cost projections for production of Redox chemicals
NASA Technical Reports Server (NTRS)
Walther, J. F.; Greco, C. C.; Rusinko, R. N.; Wadsworth, A. L., III
1982-01-01
A cost study of four proposed manufacturing processes for redox chemicals for the NASA REDOX Energy Storage System yielded favorable selling prices in the range $0.99 to $1.91/kg of chromic chloride, anhydrous basis, including ferrous chloride. The prices corresponded to specific energy storage costs from under $9 to $17/kWh. A refined and expanded cost analysis of the most favored process yielded a price estimate corresponding to a storage cost of $11/kWh. The findings supported the potential economic viability of the NASA REDOX system.
NASA Technical Reports Server (NTRS)
1981-01-01
The manufacturing cost of a General Electric 12 meter diameter concentrator was estimated. This parabolic dish concentrator for solar thermal system was costed in annual production volumes of 100 - 1,000 - 5,000 - 10,000 - 50,000 100,000 - 400,000 and 1,000,000 units. Presented for each volume are the costs of direct labor, material, burden, tooling, capital equipment and buildings. Also presented is the direct labor personnel and factory space requirements. All costs are based on early 1981 economics.
Global Economic Burden of Norovirus Gastroenteritis
Bartsch, Sarah M.; Lopman, Benjamin A.; Ozawa, Sachiko; Hall, Aron J.; Lee, Bruce Y.
2016-01-01
Background Despite accounting for approximately one fifth of all acute gastroenteritis illnesses, norovirus has received comparatively less attention than other infectious pathogens. With several candidate vaccines under development, characterizing the global economic burden of norovirus could help funders, policy makers, public health officials, and product developers determine how much attention and resources to allocate to advancing these technologies to prevent and control norovirus. Methods We developed a computational simulation model to estimate the economic burden of norovirus in every country/area (233 total) stratified by WHO region and globally, from the health system and societal perspectives. We considered direct costs of illness (e.g., clinic visits and hospitalization) and productivity losses. Results Globally, norovirus resulted in a total of $4.2 billion (95% UI: $3.2–5.7 billion) in direct health system costs and $60.3 billion (95% UI: $44.4–83.4 billion) in societal costs per year. Disease amongst children <5 years cost society $39.8 billion, compared to $20.4 billion for all other age groups combined. Costs per norovirus illness varied by both region and age and was highest among adults ≥55 years. Productivity losses represented 84–99% of total costs varying by region. While low and middle income countries and high income countries had similar disease incidence (10,148 vs. 9,935 illness per 100,000 persons), high income countries generated 62% of global health system costs. In sensitivity analysis, the probability of hospitalization had the largest impact on health system cost estimates ($2.8 billion globally, assuming no hospitalization costs), while the probability of missing productive days had the largest impact on societal cost estimates ($35.9 billion globally, with a 25% probability of missing productive days). Conclusions The total economic burden is greatest in young children but the highest cost per illness is among older age groups in some regions. These large costs overwhelmingly are from productivity losses resulting from acute illness. Low, middle, and high income countries all have a considerable economic burden, suggesting that norovirus gastroenteritis is a truly global economic problem. Our findings can help identify which age group(s) and/or geographic regions may benefit the most from interventions. PMID:27115736
Global Economic Burden of Norovirus Gastroenteritis.
Bartsch, Sarah M; Lopman, Benjamin A; Ozawa, Sachiko; Hall, Aron J; Lee, Bruce Y
2016-01-01
Despite accounting for approximately one fifth of all acute gastroenteritis illnesses, norovirus has received comparatively less attention than other infectious pathogens. With several candidate vaccines under development, characterizing the global economic burden of norovirus could help funders, policy makers, public health officials, and product developers determine how much attention and resources to allocate to advancing these technologies to prevent and control norovirus. We developed a computational simulation model to estimate the economic burden of norovirus in every country/area (233 total) stratified by WHO region and globally, from the health system and societal perspectives. We considered direct costs of illness (e.g., clinic visits and hospitalization) and productivity losses. Globally, norovirus resulted in a total of $4.2 billion (95% UI: $3.2-5.7 billion) in direct health system costs and $60.3 billion (95% UI: $44.4-83.4 billion) in societal costs per year. Disease amongst children <5 years cost society $39.8 billion, compared to $20.4 billion for all other age groups combined. Costs per norovirus illness varied by both region and age and was highest among adults ≥55 years. Productivity losses represented 84-99% of total costs varying by region. While low and middle income countries and high income countries had similar disease incidence (10,148 vs. 9,935 illness per 100,000 persons), high income countries generated 62% of global health system costs. In sensitivity analysis, the probability of hospitalization had the largest impact on health system cost estimates ($2.8 billion globally, assuming no hospitalization costs), while the probability of missing productive days had the largest impact on societal cost estimates ($35.9 billion globally, with a 25% probability of missing productive days). The total economic burden is greatest in young children but the highest cost per illness is among older age groups in some regions. These large costs overwhelmingly are from productivity losses resulting from acute illness. Low, middle, and high income countries all have a considerable economic burden, suggesting that norovirus gastroenteritis is a truly global economic problem. Our findings can help identify which age group(s) and/or geographic regions may benefit the most from interventions.
The evaluation of cost-of-illness due to use of cost-of-illness-based chemicals.
Hong, Jiyeon; Lee, Yongjin; Lee, Geonwoo; Lee, Hanseul; Yang, Jiyeon
2015-01-01
This study is conducted to estimate the cost paid by the public suffering from disease possibly caused by chemical and to examine the effect on public health. Cost-benefit analysis is an important factor in analysis and decision-making and is an important policy decision tool in many countries. Cost-of-illness (COI), a kind of scale-based analysis method, estimates the potential value lost as a result of illness as a monetary unit and calculates the cost in terms of direct, indirect and psychological costs. This study estimates direct medical costs, transportation fees for hospitalization and outpatient treatment, and nursing fees through a number of patients suffering from disease caused by chemicals in order to analyze COI, taking into account the cost of productivity loss as an indirect cost. The total yearly cost of the diseases studied in 2012 is calculated as 77 million Korean won (KRW) per person. The direct and indirect costs being 52 million KRW and 23 million KRW, respectively. Within the total cost of illness, mental and behavioral disability costs amounted to 16 million KRW, relevant blood immunological parameters costs were 7.4 million KRW, and disease of the nervous system costs were 6.7 million KRW. This study reports on a survey conducted by experts regarding diseases possibly caused by chemicals and estimates the cost for the general public. The results can be used to formulate a basic report for a social-economic evaluation of the permitted use of chemicals and limits of usage.
Adaptive UAV Attitude Estimation Employing Unscented Kalman Filter, FOAM and Low-Cost MEMS Sensors
de Marina, Héctor García; Espinosa, Felipe; Santos, Carlos
2012-01-01
Navigation employing low cost MicroElectroMechanical Systems (MEMS) sensors in Unmanned Aerial Vehicles (UAVs) is an uprising challenge. One important part of this navigation is the right estimation of the attitude angles. Most of the existent algorithms handle the sensor readings in a fixed way, leading to large errors in different mission stages like take-off aerobatic maneuvers. This paper presents an adaptive method to estimate these angles using off-the-shelf components. This paper introduces an Attitude Heading Reference System (AHRS) based on the Unscented Kalman Filter (UKF) using the Fast Optimal Attitude Matrix (FOAM) algorithm as the observation model. The performance of the method is assessed through simulations. Moreover, field experiments are presented using a real fixed-wing UAV. The proposed low cost solution, implemented in a microcontroller, shows a satisfactory real time performance. PMID:23012559
Costs of HIV/AIDS outpatient services delivered through Zambian public health facilities.
Bratt, John H; Torpey, Kwasi; Kabaso, Mushota; Gondwe, Yebo
2011-01-01
To present evidence on unit and total costs of outpatient HIV/AIDS services in ZPCT-supported facilities in Zambia; specifically, to measure unit costs of selected outpatient HIV/AIDS services, and to estimate total annual costs of antiretroviral therapy (ART) and prevention of mother-to-child transmission (PMTCT) in Zambia. Cost data from 2008 were collected in 12 ZPCT-supported facilities (hospitals and health centres) in four provinces. Costs of all resources used to produce ART, PMTCT and CT visits were included, using the perspective of the provider. All shared costs were distributed to clinic visits using appropriate allocation variables. Estimates of annual costs of HIV/AIDS services were made using ZPCT and Ministry of Health data on numbers of persons receiving services in 2009. Unit costs of visits were driven by costs of drugs, laboratory tests and clinical labour, while variability in visit costs across facilities was explained mainly by differences in utilization. First-year costs of ART per client ranged from US$278 to US$523 depending on drug regimen and facility type; costs of a complete course of antenatal care (ANC) including PMTCT were approximately US$114. Annual costs of ART provided in ZPCT-supported facilities were estimated at US$14.7-$40.1 million depending on regimen, and annual costs of antenatal care including PMTCT were estimated at US$16 million. In Zambia as a whole, the respective estimates were US$41.0-114.2 million for ART and US$57.7 million for ANC including PMTCT. Consistent with the literature, total costs of services were dominated by drugs, laboratory tests and clinical labour. For each visit type, variability across facilities in total costs and cost components suggests that some potential exists to reduce costs through greater harmonization of care protocols and more intensive use of fixed resources. Improving facility-level information on the costs of resources used to produce services should be emphasized as an element of health systems strengthening. © 2010 Blackwell Publishing Ltd.
The ASAC Flight Segment and Network Cost Models
NASA Technical Reports Server (NTRS)
Kaplan, Bruce J.; Lee, David A.; Retina, Nusrat; Wingrove, Earl R., III; Malone, Brett; Hall, Stephen G.; Houser, Scott A.
1997-01-01
To assist NASA in identifying research art, with the greatest potential for improving the air transportation system, two models were developed as part of its Aviation System Analysis Capability (ASAC). The ASAC Flight Segment Cost Model (FSCM) is used to predict aircraft trajectories, resource consumption, and variable operating costs for one or more flight segments. The Network Cost Model can either summarize the costs for a network of flight segments processed by the FSCM or can be used to independently estimate the variable operating costs of flying a fleet of equipment given the number of departures and average flight stage lengths.
A study of methods for lowering aerial environmental survey cost
NASA Technical Reports Server (NTRS)
Stansberry, J. R.
1973-01-01
The results are presented of a study of methods for lowering the cost of environmental aerial surveys. A wide range of low cost techniques were investigated for possible application to current pressing urban and rural problems. The objective of the study is to establish a definition of the technical problems associated with conducting aerial surveys using various low cost techniques, to conduct a survey of equipment which may be used in low cost systems, and to establish preliminary estimates of cost. A set of candidate systems were selected and described for the environmental survey tasks.
Estimating the cost of compensating victims of medical negligence.
Fenn, P.; Hermans, D.; Dingwall, R.
1994-01-01
The current system in Britain for compensating victims of medical injury depends on an assessment of negligence. Despite the sporadic pressure on the government to adopt a "no fault" approach, such as exists in Sweden, the negligence system will probably remain for the immediate future. The cost of this system was estimated to be 52.3m pounds for England 1990-1. The problem for the future, however, is one of forecasting accuracy at provider level: too high a guess and current patient care will suffer; too low a guess and future patient care will suffer. The introduction of a mutual insurance scheme may not resolve these difficulties, as someone will have to set the rates. Moreover, the figures indicate that if a no fault scheme was introduced the cost might be four times that of the current system, depending on the type of scheme adopted. PMID:8081145
Annual Direct Medical Costs of Diabetic Foot Disease in Brazil: A Cost of Illness Study.
Toscano, Cristiana M; Sugita, Tatiana H; Rosa, Michelle Q M; Pedrosa, Hermelinda C; Rosa, Roger Dos S; Bahia, Luciana R
2018-01-08
The aim of this study was to estimate the annual costs for the treatment of diabetic foot disease (DFD) in Brazil. We conducted a cost-of-illness study of DFD in 2014, while considering the Brazilian Public Healthcare System (SUS) perspective. Direct medical costs of outpatient management and inpatient care were considered. For outpatient costs, a panel of experts was convened from which utilization of healthcare services for the management of DFD was obtained. When considering the range of syndromes included in the DFD spectrum, we developed four well-defined hypothetical DFD cases: (1) peripheral neuropathy without ulcer, (2) non-infected foot ulcer, (3) infected foot ulcer, and (4) clinical management of amputated patients. Quantities of each healthcare service was then multiplied by their respective unit costs obtained from national price listings. We then developed a decision analytic tree to estimate nationwide costs of DFD in Brazil, while taking into the account the estimated cost per case and considering epidemiologic parameters obtained from a national survey, secondary data, and the literature. For inpatient care, ICD10 codes related to DFD were identified and costs of hospitalizations due to osteomyelitis, amputations, and other selected DFD related conditions were obtained from a nationwide hospitalization database. Direct medical costs of DFD in Brazil was estimated considering the 2014 purchasing power parity (PPP) (1 Int$ = 1.748 BRL). We estimated that the annual direct medical costs of DFD in 2014 was Int$ 361 million, which denotes 0.31% of public health expenses for this period. Of the total, Int$ 27.7 million (13%) was for inpatient, and Int$ 333.5 million (87%) for outpatient care. Despite using different methodologies to estimate outpatient and inpatient costs related to DFD, this is the first study to assess the overall economic burden of DFD in Brazil, while considering all of its syndromes and both outpatients and inpatients. Although we have various reasons to believe that the hospital costs are underestimated, the estimated DFD burden is significant. As such, public health preventive strategies to reduce DFD related morbidity and mortality and costs are of utmost importance.
1980-06-01
43 3000 TYPICAL MID-1978 COSTS, all overhead included 2000- Type of System: Double alkali flue gas desulfurization plus baghouse particulate removal...Figures 5, 6, and 8 also provide cost estimating data for oil- and natural gas -fired steam turbine systems. Figure 5 shows the steam- generating station of...to the ownership and operation of the system. For systems burning oil or natural gas , fuel will typically constitute 65-90% of the total life cycle
Identifying inaccuracy of MS Project using system analysis
NASA Astrophysics Data System (ADS)
Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi
2018-05-01
The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.
NASA Technical Reports Server (NTRS)
Boothe, W. A.; Corman, J. C.; Johnson, G. G.; Cassel, T. A. V.
1976-01-01
Results are presented of an investigation of gasification and clean fuels from coal. Factors discussed include: coal and coal transportation costs; clean liquid and gas fuel process efficiencies and costs; and cost, performance, and environmental intrusion elements of the integrated low-Btu coal gasification system. Cost estimates for the balance-of-plant requirements associated with advanced energy conversion systems utilizing coal or coal-derived fuels are included.
Logistics: Implementation of Performance - Based Logistics for the Javelin Weapon System
2005-03-07
the c.ontext of each lice within the Automated Cost 24 Batimating-hTasgraled Tools ( ACEIT ) mode], the Army’s standard cost model, containing the EA was...fully validated the EA, The Javelin E.A was valihdted through an extensive review of the EA cost documentation in (te ACEIT file in coordination with... ACEIT file of the system cost estimate- This documentation was conndered to be suflicienT by the CEAC Director once the EA was determinmd to be valid
Pressure injury in Australian public hospitals: a cost-of-illness study.
Nguyen, Kim-Huong; Chaboyer, Wendy; Whitty, Jennifer A
2015-06-01
Pressure injuries (PI) are largely preventable and can be viewed as an adverse outcome of a healthcare admission, yet they affect millions of people and consume billions of dollars in healthcare spending. The existing literature in Australia presents a patchy picture of the economic burden of PI on society and the health system. The aim of the present study was to provide a more comprehensive and updated picture of PI by state and severity using publicly available data. A cost-of-illness analysis was conducted using a prevalence approach and a 1-year time horizon based on data from the existing literature extrapolated using simulation methods to estimate the costs by PI severity and state subgroups. The treatment cost across all states and severity in 2012-13 was estimated to be A$983 million per annum, representing approximately 1.9% of all public hospital expenditure or 0.6% of the public recurrent health expenditure. The opportunity cost was valued at an additional A$820 million per annum. These estimates were associated with a total number of 121 645 PI cases in 2012-13 and a total number of 524 661 bed days lost. The costs estimated in the present study highlight the economic waste for the Australian health system associated with a largely avoidable injury. Wastage can also be reduced by preventing moderate injuries (Stage I and II) from developing into severe cases (Stage III and IV), because the severe cases, accounting for 12% of cases, mounted to 30% of the total cost.
Effect of present technology on airship capabilities
NASA Technical Reports Server (NTRS)
Madden, R. T.
1975-01-01
The effect is presented of updating past airship designs using current materials and propulsion systems to determine new airship performance and productivity capabilities. New materials and power plants permit reductions in the empty weights and increases in the useful load capabilities of past airship designs. The increased useful load capability results in increased productivity for a given range, i.e., either increased payload at the same operating speed or increased operating speed for the same payload weight or combinations of both. Estimated investment costs and operating costs are presented to indicate the significant cost parameters in estimating transportation costs of payloads in cents per ton mile. Investment costs are presented considering production lots of 1, 10 and 100 units. Operating costs are presented considering flight speeds and ranges.
Estimated costs of production and potential prices for the WHO Essential Medicines List
Hill, Andrew M; Barber, Melissa J
2018-01-01
Introduction There are persistent gaps in access to affordable medicines. The WHO Model List of Essential Medicines (EML) includes medicines considered necessary for functional health systems. Methods A generic price estimation formula was developed by reviewing published analyses of cost of production for medicines and assuming manufacture in India, which included costs of formulation, packaging, taxation and a 10% profit margin. Data on per-kilogram prices of active pharmaceutical ingredient exported from India were retrieved from an online database. Estimated prices were compared with the lowest globally available prices for HIV/AIDS, tuberculosis (TB) and malaria medicines, and current prices in the UK, South Africa and India. Results The estimation formula had good predictive accuracy for HIV/AIDS, TB and malaria medicines. Estimated generic prices ranged from US$0.01 to US$1.45 per unit, with most in the lower end of this range. Lowest available prices were greater than estimated generic prices for 214/277 (77%) comparable items in the UK, 142/212 (67%) in South Africa and 118/298 (40%) in India. Lowest available prices were more than three times above estimated generic price for 47% of cases compared in the UK and 22% in South Africa. Conclusion A wide range of medicines in the EML can be profitably manufactured at very low cost. Most EML medicines are sold in the UK and South Africa at prices significantly higher than those estimated from production costs. Generic price estimation and international price comparisons could empower government price negotiations and support cost-effectiveness calculations. PMID:29564159
A Cost Analysis of a Community Health Worker Program in Rural Vermont
Wang, Guijing; Ruggles, Laural; Dunet, Diane O.
2015-01-01
Studies have shown that community health workers (CHWs) can improve the effectiveness of health care systems; however, little has been reported about CHW program costs. We examined the costs of a program staffed by three CHWs associated with a small, rural hospital in Vermont. We used a standardized data collection tool to compile cost information from administrative data and personal interviews. We analyzed personnel and operational costs from October 2010 to September 2011. The estimated total program cost was $420,348, a figure comprised of $281,063 (67 %) for personnel and $139,285 (33 %) for operations. CHW salaries and office space were the major cost components. Our cost analysis approach may be adapted by others to conduct cost analyses of their CHW program. Our cost estimates can help inform future economic studies of CHW programs and resource allocation decisions. PMID:23794072
Moriarty, James P; Branda, Megan E; Olsen, Kerry D; Shah, Nilay D; Borah, Bijan J; Wagie, Amy E; Egginton, Jason S; Naessens, James M
2012-03-01
To provide the simultaneous 7-year estimates of incremental costs of smoking and obesity among employees and dependents in a large health care system. We used a retrospective cohort aged 18 years or older with continuous enrollment during the study period. Longitudinal multivariate cost analyses were performed using generalized estimating equations with demographic adjustments. The annual incremental mean costs of smoking by age group ranged from $1274 to $1401. The incremental costs of morbid obesity II by age group ranged from $5467 to $5530. These incremental costs drop substantially when comorbidities are included. Obesity and smoking have large long-term impacts on health care costs of working-age adults. Controlling comorbidities impacted incremental costs of obesity but may lead to underestimation of the true incremental costs because obesity is a risk factor for developing chronic conditions.
Optimal estimation and scheduling in aquifer management using the rapid feedback control method
NASA Astrophysics Data System (ADS)
Ghorbanidehno, Hojat; Kokkinaki, Amalia; Kitanidis, Peter K.; Darve, Eric
2017-12-01
Management of water resources systems often involves a large number of parameters, as in the case of large, spatially heterogeneous aquifers, and a large number of "noisy" observations, as in the case of pressure observation in wells. Optimizing the operation of such systems requires both searching among many possible solutions and utilizing new information as it becomes available. However, the computational cost of this task increases rapidly with the size of the problem to the extent that textbook optimization methods are practically impossible to apply. In this paper, we present a new computationally efficient technique as a practical alternative for optimally operating large-scale dynamical systems. The proposed method, which we term Rapid Feedback Controller (RFC), provides a practical approach for combined monitoring, parameter estimation, uncertainty quantification, and optimal control for linear and nonlinear systems with a quadratic cost function. For illustration, we consider the case of a weakly nonlinear uncertain dynamical system with a quadratic objective function, specifically a two-dimensional heterogeneous aquifer management problem. To validate our method, we compare our results with the linear quadratic Gaussian (LQG) method, which is the basic approach for feedback control. We show that the computational cost of the RFC scales only linearly with the number of unknowns, a great improvement compared to the basic LQG control with a computational cost that scales quadratically. We demonstrate that the RFC method can obtain the optimal control values at a greatly reduced computational cost compared to the conventional LQG algorithm with small and controllable losses in the accuracy of the state and parameter estimation.
Planning and Estimation of Operations Support Requirements
NASA Technical Reports Server (NTRS)
Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon
2010-01-01
Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.
Synthesis of a large communications aperture using small antennas
NASA Technical Reports Server (NTRS)
Resch, George M.; Cwik, T. W.; Jamnejad, V.; Logan, R. T.; Miller, R. B.; Rogstad, Dave H.
1994-01-01
In this report we compare the cost of an array of small antennas to that of a single large antenna assuming both the array and single large antenna have equal performance and availability. The single large antenna is taken to be one of the 70-m antennas of the Deep Space Network. The cost of the array is estimated as a function of the array element diameter for three different values of system noise temperature corresponding to three different packaging schemes for the first amplifier. Array elements are taken to be fully steerable paraboloids and their cost estimates were obtained from commercial vendors. Array loss mechanisms and calibration problems are discussed. For array elements in the range 3 - 35 m there is no minimum in the cost versus diameter curve for the three system temperatures that were studied.
Cost Growth: Perception and Reality
2010-07-01
McNichol, Tyson, Hiller, Cloud, & Minix , 2005, p. 6). In other words, high cost growth was not a phenomenon across the board but concentrated in a...McNichol, D., Tyson, K., Hiller, J., Cloud, H., & Minix , J. (2005). The accuracy of independent estimates of the procurement costs of major systems