NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.
Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army
NASA Technical Reports Server (NTRS)
Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.
2016-01-01
Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.
The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management
NASA Technical Reports Server (NTRS)
Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param
2016-01-01
Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
75 FR 29324 - Preferred Supplier Program (PSP)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... of the Navy, Acquisition and Logistics Management (DASN (A&LM)), is soliciting comments that the...; in the areas of cost, schedule, performance, quality, and business relations would be granted... exemplary performance, at the corporate level, in the areas of cost, schedule, performance, quality, and...
75 FR 28788 - Preferred Supplier Program (PSP)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... of the Navy, Acquisition and Logistics Management (DASN (A&LM)), is soliciting comments that the...; in the areas of cost, schedule, performance, quality, and business relations would be granted... demonstrated exemplary performance, at the corporate level, in the areas of cost, schedule, performance...
Electric/Hybrid Vehicle Simulation
NASA Technical Reports Server (NTRS)
Slusser, R. A.; Chapman, C. P.; Brennand, J. P.
1985-01-01
ELVEC computer program provides vehicle designer with simulation tool for detailed studies of electric and hybrid vehicle performance and cost. ELVEC simulates performance of user-specified electric or hybrid vehicle under user specified driving schedule profile or operating schedule. ELVEC performs vehicle design and life cycle cost analysis.
Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns
NASA Technical Reports Server (NTRS)
Majerowicz, Walt; Shinn, Stephen A.
2016-01-01
This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.
NASA Astrophysics Data System (ADS)
Robertson, Randolph B.
This study investigates the impact of concurrent design on the cost growth and schedule growth of US Department of Defense Major Defense Acquisition Systems (MDAPs). It is motivated by the question of whether employment of concurrent design in the development of a major weapon system will produce better results in terms of cost and schedule than traditional serial development methods. Selected Acquisition Reports were used to determine the cost and schedule growth of MDAPs as well as the degree of concurrency employed. Two simple linear regression analyses were used to determine the degree to which cost growth and schedule growth vary with concurrency. The results were somewhat surprising in that for major weapon systems the utilization of concurrency as it was implemented in the programs under study was shown to have no effect on cost performance, and that performance to development schedule, one of the purported benefits of concurrency, was actually shown to deteriorate with increases in concurrency. These results, while not an indictment of the concept of concurrency, indicate that better practices and methods are needed in the implementation of concurrency in major weapon systems. The findings are instructive to stakeholders in the weapons acquisition process in their consideration of whether and how to employ concurrent design strategies in their planning of new weapons acquisition programs.
A methodology for spacecraft technology insertion analysis balancing benefit, cost, and risk
NASA Astrophysics Data System (ADS)
Bearden, David Allen
Emerging technologies are changing the way space missions are developed and implemented. Technology development programs are proceeding with the goal of enhancing spacecraft performance and reducing mass and cost. However, it is often the case that technology insertion assessment activities, in the interest of maximizing performance and/or mass reduction, do not consider synergistic system-level effects. Furthermore, even though technical risks are often identified as a large cost and schedule driver, many design processes ignore effects of cost and schedule uncertainty. This research is based on the hypothesis that technology selection is a problem of balancing interrelated (and potentially competing) objectives. Current spacecraft technology selection approaches are summarized, and a Methodology for Evaluating and Ranking Insertion of Technology (MERIT) that expands on these practices to attack otherwise unsolved problems is demonstrated. MERIT combines the modern techniques of technology maturity measures, parametric models, genetic algorithms, and risk assessment (cost and schedule) in a unique manner to resolve very difficult issues including: user-generated uncertainty, relationships between cost/schedule and complexity, and technology "portfolio" management. While the methodology is sufficiently generic that it may in theory be applied to a number of technology insertion problems, this research focuses on application to the specific case of small (<500 kg) satellite design. Small satellite missions are of particular interest because they are often developed under rigid programmatic (cost and schedule) constraints and are motivated to introduce advanced technologies into the design. MERIT is demonstrated for programs procured under varying conditions and constraints such as stringent performance goals, not-to-exceed costs, or hard schedule requirements. MERIT'S contributions to the engineering community are its: unique coupling of the aspects of performance, cost, and schedule; assessment of system level impacts of technology insertion; procedures for estimating uncertainties (risks) associated with advanced technology; and application of heuristics to facilitate informed system-level technology utilization decisions earlier in the conceptual design phase. MERIT extends the state of the art in technology insertion assessment selection practice and, if adopted, may aid designers in determining the configuration of complex systems that meet essential requirements in a timely, cost-effective manner.
The Joint Confidence Level Paradox: A History of Denial
NASA Technical Reports Server (NTRS)
Butts, Glenn; Linton, Kent
2009-01-01
This paper is intended to provide a reliable methodology for those tasked with generating price tags on construction (C0F) and research and development (R&D) activities in the NASA performance world. This document consists of a collection of cost-related engineering detail and project fulfillment information from early agency days to the present. Accurate historical detail is the first place to start when determining improved methodologies for future cost and schedule estimating. This paper contains a beneficial proposed cost estimating method for arriving at more reliable numbers for future submits. When comparing current cost and schedule methods with earlier cost and schedule approaches, it became apparent that NASA's organizational performance paradigm has morphed. Mission fulfillment speed has slowed and cost calculating factors have increased in 21st Century space exploration.
Project resource reallocation algorithm
NASA Technical Reports Server (NTRS)
Myers, J. E.
1981-01-01
A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.
2017-12-01
2-89) Prescribed by ANSI Std. 239-18 ii THIS PAGE INTENTIONALLY LEFT BLANK iii Approved for public release. Distribution is unlimited. COST ...from the scope of this demonstration due to time constraints. Further study of this software would benefit similar cost , schedule, and performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release. Distribution
C/SCSC overview: approach, implementation, use. [Cost/Schedule Control Systems Criteria
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turf, Larry
1979-01-01
An overview of the Cost/Schedule Control System Criteria, known as C/SCS or C/S Squared is pesented. In the mid-1960s, several DOD service agencies embarked on a new performance measurement concept to track cost and schedule performance on major DOD programs. The performance measurement concept of C/SCS has expanded from DOD use to the Department of Energy (PMS), NASA (533 reports), and private industry such as shipbuilding, utilities, and construction. This paper describes the C/SCSC with the events leading to the C/SCS requirement, how to approach the requirement, and discusses implementing and using the system. Many government publications, directives, and instructionsmore » on the subject are listed in the publication.« less
System cost/performance analysis (study 2.3). Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Kazangey, T.
1973-01-01
The relationships between performance, safety, cost, and schedule parameters were identified and quantified in support of an overall effort to generate program models and methodology that provide insight into a total space vehicle program. A specific space vehicle system, the attitude control system (ACS), was used, and a modeling methodology was selected that develops a consistent set of quantitative relationships among performance, safety, cost, and schedule, based on the characteristics of the components utilized in candidate mechanisms. These descriptive equations were developed for a three-axis, earth-pointing, mass expulsion ACS. A data base describing typical candidate ACS components was implemented, along with a computer program to perform sample calculations. This approach, implemented on a computer, is capable of determining the effect of a change in functional requirements to the ACS mechanization and the resulting cost and schedule. By a simple extension of this modeling methodology to the other systems in a space vehicle, a complete space vehicle model can be developed. Study results and recommendations are presented.
DORCA computer program. Volume 1: User's guide
NASA Technical Reports Server (NTRS)
Wray, S. T., Jr.
1971-01-01
The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.
Liu, Weihua; Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng
2014-01-01
In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC.
Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng
2014-01-01
In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC. PMID:24715818
48 CFR 2937.602 - Elements of performance-based contracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...
48 CFR 2452.216-70 - Estimated cost, base fee and award fee.
Code of Federal Regulations, 2010 CFR
2010-10-01
...] increments on the schedule set forth in the Performance Evaluation Plan established by the government. The amount payable shall be based on the progress toward completion of contract tasks as determined by the... payments of the award fee in accordance with the schedule established in the Performance Evaluation Plan...
NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly.
The Impact of Early Design Phase Risk Identification Biases on Space System Project Performance
NASA Technical Reports Server (NTRS)
Reeves, John D., Jr.; Eveleigh, Tim; Holzer, Thomas; Sarkani, Shahryar
2012-01-01
Risk identification during the early design phases of complex systems is commonly implemented but often fails to result in the identification of events and circumstances that truly challenge project performance. Inefficiencies in cost and schedule estimation are usually held accountable for cost and schedule overruns, but the true root cause is often the realization of programmatic risks. A deeper understanding of frequent risk identification trends and biases pervasive during space system design and development is needed, for it would lead to improved execution of existing identification processes and methods.
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Cost and schedule management on the quiet short-haul research aircraft project
NASA Technical Reports Server (NTRS)
Wilcox, D. E.; Patterakis, P.
1979-01-01
The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.
Incremental Scheduling Engines: Cost Savings through Automation
NASA Technical Reports Server (NTRS)
Jaap, John; Phillips, Shaun
2005-01-01
As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.
Satellite-instrument system engineering best practices and lessons
NASA Astrophysics Data System (ADS)
Schueler, Carl F.
2009-08-01
This paper focuses on system engineering development issues driving satellite remote sensing instrumentation cost and schedule. A key best practice is early assessment of mission and instrumentation requirements priorities driving performance trades among major instrumentation measurements: Radiometry, spatial field of view and image quality, and spectral performance. Key lessons include attention to technology availability and applicability to prioritized requirements, care in applying heritage, approaching fixed-price and cost-plus contracts with appropriate attention to risk, and assessing design options with attention to customer preference as well as design performance, and development cost and schedule. A key element of success either in contract competition or execution is team experience. Perhaps the most crucial aspect of success, however, is thorough requirements analysis and flowdown to specifications driving design performance with sufficient parameter margin to allow for mistakes or oversights - the province of system engineering from design inception to development, test and delivery.
Applying Resource Based Relative Value Scales (RBRVS) to the Champus Program
1990-12-01
fee for the related service .[Ref. 6:p. 7] F. EFFECTS OF RBRVS When a Medicare fee schedule is fully implemented, several Important...reimbursement rates increase would be attracted to CHAMPUS. In analyzing the impact of a resource based fee schedule on the Medicare program, the PPRC...procedures performed by physicians into components of work, training costs, and practice costs. The Medicare program is planning to implement a fee
Cost and schedule estimation study report
NASA Technical Reports Server (NTRS)
Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon
1993-01-01
This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.
Space network scheduling benchmark: A proof-of-concept process for technology transfer
NASA Technical Reports Server (NTRS)
Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy
1993-01-01
This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.
NASA Technical Reports Server (NTRS)
Bradley, E. S.; Little, B. H.; Warnock, W.; Jenness, C. M.; Wilson, J. M.; Powell, C. W.; Shoaf, L.
1982-01-01
The establishment of propfan technology readiness was determined and candidate drive systems for propfan application were identified. Candidate testbed aircraft were investigated for testbed aircraft suitability and four aircraft selected as possible propfan testbed vehicles. An evaluation of the four candidates was performed and the Boeing KC-135A and the Gulfstream American Gulfstream II recommended as the most suitable aircraft for test application. Conceptual designs of the two recommended aircraft were performed and cost and schedule data for the entire testbed program were generated. The program total cost was estimated and a wind tunnel program cost and schedule is generated in support of the testbed program.
Navy Program Manager’s Guide, 1985 Edition
1985-01-01
1-7 Relationship of Development Cost in System Life -Cycle Cost (LCC) ......................... 1-7 Realistic Costing and Budgeting...Review (PROR)..... 4-53 x MI *) First-Article Configuration Inspection (FACI) ...... 4-54 Cost Management- Life -Cycle Costing (LCC) ..................... 4...innovation and minimize costs. 4. Consideration of life -cycle cost (LCC) such that affordability is put on an equal basis with system performance, schedule
Limat, Samuel; Bracco-Nolin, Claire-Hélène; Legat-Fagnoni, Christine; Chaigneau, Loic; Stein, Ulrich; Huchet, Bernard; Pivot, Xavier; Woronoff-Lemsi, Marie-Christine
2006-06-01
The cost of chemotherapy has dramatically increased in advanced colorectal cancer patients, and the schedule of fluorouracil administration appears to be a determining factor. This retrospective study compared direct medical costs related to two different de Gramont schedules (standard vs. simplified) given in first-line chemotherapy with oxaliplatin or irinotecan. This cost-minimization analysis was performed from the French Health System perspective. Consecutive unselected patients treated in first-line therapy by LV5FU2 de Gramont with oxaliplatin (Folfox regimen) or with irinotecan (Folfiri regimen) were enrolled. Hospital and outpatient resources related to chemotherapy and adverse events were collected from 1999 to 2004 in 87 patients. Overall cost was reduced in the simplified regimen. The major factor which explained cost saving was the lower need for admissions for chemotherapy. Amount of cost saving depended on the method for assessing hospital stay. In patients treated by the Folfox regimen the per diem and DRG methods found cost savings of Euro 1,997 and Euro 5,982 according to studied schedules; in patients treated by Folfiri regimen cost savings of Euro 4,773 and Euro 7,274 were observed, respectively. In addition, travel costs were also reduced by simplified regimens. The robustness of our results was showed by one-way sensitivity analyses. These findings demonstrate that the simplified de Gramont schedule reduces costs of current first-line chemotherapy in advanced colorectal cancer. Interestingly, our study showed several differences in costs between two costing approaches of hospital stay: average per diem and DRG costs. These results suggested that standard regimen may be considered a profitable strategy from the hospital perspective. The opposition between health system perspective and hospital perspective is worth examining and may affect daily practices. In conclusion, our study shows that the simplified de Gramont schedule in combination with oxaliplatin or irinotecan is an attractive option from the French Health System perspective. This safe and less costly regimen must compared to alternative options such as oral fluoropyrimidines.
Appointment standardization evaluation in a primary care facility.
Huang, Yu-Li
2016-07-11
Purpose - The purpose of this paper is to evaluate the performance on standardizing appointment slot length in a primary care clinic to understand the impact of providers' preferences and practice differences. Design/methodology/approach - The treatment time data were collected for each provider. There were six patient types: emergency/urgent care (ER/UC), follow-up patient (FU), new patient, office visit (OV), physical exam, and well-child care. Simulation model was developed to capture patient flow and measure patient wait time, provider idle time, cost, overtime, finish time, and the number of patients scheduled. Four scheduling scenarios were compared: scheduled all patients at 20 minutes; scheduled ER/UC, FU, OV at 20 minutes and others at 40 minutes; scheduled patient types on individual provider preference; and scheduled patient types on combined provider preference. Findings - Standardized scheduling among providers increase cost by 57 per cent, patient wait time by 83 per cent, provider idle time by five minutes per patient, overtime by 22 minutes, finish time by 30 minutes, and decrease patient access to care by approximately 11 per cent. An individualized scheduling approach could save as much as 14 per cent on cost and schedule 1.5 more patients. The combined preference method could save about 8 per cent while the number of patients scheduled remained the same. Research limitations/implications - The challenge is to actually disseminate the findings to medical providers and adjust scheduling systems accordingly. Originality/value - This paper concluded standardization of providers' clinic preference and practice negatively impact clinic service quality and access to care.
77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Award Schedule (MAS) Program Continuous Open Season- Operational Change AGENCY: Federal Acquisition... proposing this operational change to enhance the performance of and modernize the MAS program in three key program areas: Small business viability, operational efficiency, and cost control. The DBM will realign...
Artificial Immune Algorithm for Subtask Industrial Robot Scheduling in Cloud Manufacturing
NASA Astrophysics Data System (ADS)
Suma, T.; Murugesan, R.
2018-04-01
The current generation of manufacturing industry requires an intelligent scheduling model to achieve an effective utilization of distributed manufacturing resources, which motivated us to work on an Artificial Immune Algorithm for subtask robot scheduling in cloud manufacturing. This scheduling model enables a collaborative work between the industrial robots in different manufacturing centers. This paper discussed two optimizing objectives which includes minimizing the cost and load balance of industrial robots through scheduling. To solve these scheduling problems, we used the algorithm based on Artificial Immune system. The parameters are simulated with MATLAB and the results compared with the existing algorithms. The result shows better performance than existing.
NASA Technical Reports Server (NTRS)
Janz, R. F.
1974-01-01
The systems cost/performance model was implemented as a digital computer program to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses. The computer is described along with the operating environment in which the program was written and checked, the program specifications such as discussions of logic and computational flow, the different subsystem models involved in the design of the spacecraft, and routines involved in the nondesign area such as costing and scheduling of the design. Preliminary results for the DSCS-II design are also included.
Space station program phase B definition: Nuclear reactor-powered space station cost and schedules
NASA Technical Reports Server (NTRS)
1971-01-01
Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.
Experiment Needs and Facilities Study Appendix A Transient Reactor Test Facility (TREAT) Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The TREAT Upgrade effort is designed to provide significant new capabilities to satisfy experiment requirements associated with key LMFBR Safety Issues. The upgrade consists of reactor-core modifications to supply the physics performance needed for the new experiments, an Advanced TREAT loop with size and thermal-hydraulics capabilities needed for the experiments, associated interface equipment for loop operations and handling, and facility modifications necessary to accommodate operations with the Loop. The costs and schedules of the tasks to be accomplished under the TREAT Upgrade project are summarized. Cost, including contingency, is about 10 million dollars (1976 dollars). A schedule for execution ofmore » 36 months has been established to provide the new capabilities in order to provide timely support of the LMFBR national effort. A key requirement for the facility modifications is that the reactor availability will not be interrupted for more than 12 weeks during the upgrade. The Advanced TREAT loop is the prototype for the STF small-bundle package loop. Modified TREAT fuel elements contain segments of graphite-matrix fuel with graded uranium loadings similar to those of STF. In addition, the TREAT upgrade provides for use of STF-like stainless steel-UO{sub 2} TREAT fuel for tests of fully enriched fuel bundles. This report will introduce the Upgrade study by presenting a brief description of the scope, performance capability, safety considerations, cost schedule, and development requirements. This work is followed by a "Design Description". Because greatly upgraded loop performance is central to the upgrade, a description is given of Advanced TREAT loop requirements prior to description of the loop concept. Performance requirements of the upgraded reactor system are given. An extensive discussion of the reactor physics calculations performed for the Upgrade concept study is provided. Adequate physics performance is essential for performance of experiments with the Advanced TREAT loop, and the stress placed on these calculations reflects this. Additional material on performance and safety is provided. Backup calculations on calculations of plutonium-release limits are described. Cost and schedule information for the Upgrade are presented.« less
Intercell scheduling: A negotiation approach using multi-agent coalitions
NASA Astrophysics Data System (ADS)
Tian, Yunna; Li, Dongni; Zheng, Dan; Jia, Yunde
2016-10-01
Intercell scheduling problems arise as a result of intercell transfers in cellular manufacturing systems. Flexible intercell routes are considered in this article, and a coalition-based scheduling (CBS) approach using distributed multi-agent negotiation is developed. Taking advantage of the extended vision of the coalition agents, the global optimization is improved and the communication cost is reduced. The objective of the addressed problem is to minimize mean tardiness. Computational results show that, compared with the widely used combinatorial rules, CBS provides better performance not only in minimizing the objective, i.e. mean tardiness, but also in minimizing auxiliary measures such as maximum completion time, mean flow time and the ratio of tardy parts. Moreover, CBS is better than the existing intercell scheduling approach for the same problem with respect to the solution quality and computational costs.
1980-04-15
schedule their air transportation networks, and learn the performance and financial results through simulation of the resulting traffic flows, costs...players in the role of airline management responsible for airline scheduling and market, fleet and financial planning. The Game Administrator created a...revenues and consequently the financial results for each airline. During this exercise the objective of each airline team was to schedule its flights so
NASA Instrument Cost/Schedule Model
NASA Technical Reports Server (NTRS)
Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George
2011-01-01
NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.
Report of the Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.
Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.
Hanford business structure for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less
An Analysis of Rocket Propulsion Testing Costs
NASA Technical Reports Server (NTRS)
Ramirez-Pagan, Carmen P.; Rahman, Shamim A.
2009-01-01
The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.
Balancing Authority Cooperation Concepts - Intra-Hour Scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunsaker, Matthew; Samaan, Nader; Milligan, Michael
2013-03-29
The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similarmore » and/or unchanged among the scenarios.« less
NASA Technical Reports Server (NTRS)
Frassinelli, G. J.
1972-01-01
Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.
Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments
Kadima, Hubert; Granado, Bertrand
2013-01-01
We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361
Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.
Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand
2013-01-01
We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.
Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support
NASA Technical Reports Server (NTRS)
Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun
2012-01-01
This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
Daniel I. Navon
1971-01-01
Timber RAM (Resource Allocation Method) is a long-range planning method for commercial timber lands under multiple-use management. Timber RAM can produce cutting and reforestation schedules and related harvest and economic reports. Each schedule optimizes an index of performance, subject to periodic constraints on revenues, costs, and, harvest levels. Periodic...
Quantifying Scheduling Challenges for Exascale System Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mondragon, Oscar; Bridges, Patrick G.; Jones, Terry R
2015-01-01
The move towards high-performance computing (HPC) ap- plications comprised of coupled codes and the need to dra- matically reduce data movement is leading to a reexami- nation of time-sharing vs. space-sharing in HPC systems. In this paper, we discuss and begin to quantify the perfor- mance impact of a move away from strict space-sharing of nodes for HPC applications. Specifically, we examine the po- tential performance cost of time-sharing nodes between ap- plication components, we determine whether a simple coor- dinated scheduling mechanism can address these problems, and we research how suitable simple constraint-based opti- mization techniques are for solvingmore » scheduling challenges in this regime. Our results demonstrate that current general- purpose HPC system software scheduling and resource al- location systems are subject to significant performance de- ciencies which we quantify for six representative applica- tions. Based on these results, we discuss areas in which ad- ditional research is needed to meet the scheduling challenges of next-generation HPC systems.« less
Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hulett, David T.; Nosbisch, Michael R.
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less
2013-06-01
distribution is unlimited 12b. DISTRIBUTION CODE A 13. ABSTRACT (maximum 200 words) Some major defense acquisition programs (MDAPs) are cancelled...68 VI. PRACTICAL IMPLICATIONS FOR DEFENSE ACQUISITION .....................73 A . OVERVIEW...Contract Performance Report C /SCSC Cost/Schedule Control Systems Criteria CV Cost Variance CV % Cost Variance Percentage DAE Defense Acquisition
Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
A Scheduling Algorithm for Cloud Computing System Based on the Driver of Dynamic Essential Path.
Xie, Zhiqiang; Shao, Xia; Xin, Yu
2016-01-01
To solve the problem of task scheduling in the cloud computing system, this paper proposes a scheduling algorithm for cloud computing based on the driver of dynamic essential path (DDEP). This algorithm applies a predecessor-task layer priority strategy to solve the problem of constraint relations among task nodes. The strategy assigns different priority values to every task node based on the scheduling order of task node as affected by the constraint relations among task nodes, and the task node list is generated by the different priority value. To address the scheduling order problem in which task nodes have the same priority value, the dynamic essential long path strategy is proposed. This strategy computes the dynamic essential path of the pre-scheduling task nodes based on the actual computation cost and communication cost of task node in the scheduling process. The task node that has the longest dynamic essential path is scheduled first as the completion time of task graph is indirectly influenced by the finishing time of task nodes in the longest dynamic essential path. Finally, we demonstrate the proposed algorithm via simulation experiments using Matlab tools. The experimental results indicate that the proposed algorithm can effectively reduce the task Makespan in most cases and meet a high quality performance objective.
A Scheduling Algorithm for Cloud Computing System Based on the Driver of Dynamic Essential Path
Xie, Zhiqiang; Shao, Xia; Xin, Yu
2016-01-01
To solve the problem of task scheduling in the cloud computing system, this paper proposes a scheduling algorithm for cloud computing based on the driver of dynamic essential path (DDEP). This algorithm applies a predecessor-task layer priority strategy to solve the problem of constraint relations among task nodes. The strategy assigns different priority values to every task node based on the scheduling order of task node as affected by the constraint relations among task nodes, and the task node list is generated by the different priority value. To address the scheduling order problem in which task nodes have the same priority value, the dynamic essential long path strategy is proposed. This strategy computes the dynamic essential path of the pre-scheduling task nodes based on the actual computation cost and communication cost of task node in the scheduling process. The task node that has the longest dynamic essential path is scheduled first as the completion time of task graph is indirectly influenced by the finishing time of task nodes in the longest dynamic essential path. Finally, we demonstrate the proposed algorithm via simulation experiments using Matlab tools. The experimental results indicate that the proposed algorithm can effectively reduce the task Makespan in most cases and meet a high quality performance objective. PMID:27490901
Renaissance: A revolutionary approach for providing low-cost ground data systems
NASA Technical Reports Server (NTRS)
Butler, Madeline J.; Perkins, Dorothy C.; Zeigenfuss, Lawrence B.
1996-01-01
The NASA is changing its attention from large missions to a greater number of smaller missions with reduced development schedules and budgets. In relation to this, the Renaissance Mission Operations and Data Systems Directorate systems engineering process is presented. The aim of the Renaissance approach is to improve system performance, reduce cost and schedules and meet specific customer needs. The approach includes: the early involvement of the users to define the mission requirements and system architectures; the streamlining of management processes; the development of a flexible cost estimation capability, and the ability to insert technology. Renaissance-based systems demonstrate significant reuse of commercial off-the-shelf building blocks in an integrated system architecture.
Madni, Syed Hamid Hussain; Abd Latiff, Muhammad Shafie; Abdullahi, Mohammed; Abdulhamid, Shafi'i Muhammad; Usman, Mohammed Joda
2017-01-01
Cloud computing infrastructure is suitable for meeting computational needs of large task sizes. Optimal scheduling of tasks in cloud computing environment has been proved to be an NP-complete problem, hence the need for the application of heuristic methods. Several heuristic algorithms have been developed and used in addressing this problem, but choosing the appropriate algorithm for solving task assignment problem of a particular nature is difficult since the methods are developed under different assumptions. Therefore, six rule based heuristic algorithms are implemented and used to schedule autonomous tasks in homogeneous and heterogeneous environments with the aim of comparing their performance in terms of cost, degree of imbalance, makespan and throughput. First Come First Serve (FCFS), Minimum Completion Time (MCT), Minimum Execution Time (MET), Max-min, Min-min and Sufferage are the heuristic algorithms considered for the performance comparison and analysis of task scheduling in cloud computing.
Madni, Syed Hamid Hussain; Abd Latiff, Muhammad Shafie; Abdullahi, Mohammed; Usman, Mohammed Joda
2017-01-01
Cloud computing infrastructure is suitable for meeting computational needs of large task sizes. Optimal scheduling of tasks in cloud computing environment has been proved to be an NP-complete problem, hence the need for the application of heuristic methods. Several heuristic algorithms have been developed and used in addressing this problem, but choosing the appropriate algorithm for solving task assignment problem of a particular nature is difficult since the methods are developed under different assumptions. Therefore, six rule based heuristic algorithms are implemented and used to schedule autonomous tasks in homogeneous and heterogeneous environments with the aim of comparing their performance in terms of cost, degree of imbalance, makespan and throughput. First Come First Serve (FCFS), Minimum Completion Time (MCT), Minimum Execution Time (MET), Max-min, Min-min and Sufferage are the heuristic algorithms considered for the performance comparison and analysis of task scheduling in cloud computing. PMID:28467505
Additively Manufactured Low Cost Upper Stage Combustion Chamber
NASA Technical Reports Server (NTRS)
Protz, Christopher; Cooper, Ken; Ellis, David; Fikes, John; Jones, Zachary; Kim, Tony; Medina, Cory; Taminger, Karen; Willingham, Derek
2016-01-01
Over the past two years NASA's Low Cost Upper Stage Propulsion (LCUSP) project has developed Additive Manufacturing (AM) technologies and design tools aimed at reducing the costs and manufacturing time of regeneratively cooled rocket engine components. High pressure/high temperature combustion chambers and nozzles must be regeneratively cooled to survive their operating environment, causing their design fabrication to be costly and time consuming due to the number of individual steps and different processes required. Under LCUSP, AM technologies in Sintered Laser Melting (SLM) GRCop-84 and Electron Beam Freeform Fabrication (EBF3) Inconel 625 have been significantly advanced, allowing the team to successfully fabricate a 25k-class regenerative chamber. Estimates of the costs and schedule of future builds indicate cost reductions and significant schedule reductions will be enabled by this technology. Characterization of the microstructural and mechanical properties of the SLM-produced GRCop-84, EBF3 Inconel 625 and the interface layer between the two has been performed and indicates the properties will meet the design requirements. The LCUSP chamber is to be tested with a previously demonstrated SLM injector in order to advance the Technology Readiness Level (TRL) and demonstrate the capability of the application of these processes. NASA is advancing these technologies to reduce cost and schedule for future engine applications and commercial needs.
NASA Astrophysics Data System (ADS)
Shah, Rahul H.
Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Guodong; Ollis, Thomas B.; Xiao, Bailu
Here, this paper proposes a Mixed Integer Conic Programming (MICP) model for community microgrids considering the network operational constraints and building thermal dynamics. The proposed optimization model optimizes not only the operating cost, including fuel cost, purchasing cost, battery degradation cost, voluntary load shedding cost and the cost associated with customer discomfort due to room temperature deviation from the set point, but also several performance indices, including voltage deviation, network power loss and power factor at the Point of Common Coupling (PCC). In particular, the detailed thermal dynamic model of buildings is integrated into the distribution optimal power flow (D-OPF)more » model for the optimal operation of community microgrids. The heating, ventilation and air-conditioning (HVAC) systems can be scheduled intelligently to reduce the electricity cost while maintaining the indoor temperature in the comfort range set by customers. Numerical simulation results show the effectiveness of the proposed model and significant saving in electricity cost could be achieved with network operational constraints satisfied.« less
Liu, Guodong; Ollis, Thomas B.; Xiao, Bailu; ...
2017-10-10
Here, this paper proposes a Mixed Integer Conic Programming (MICP) model for community microgrids considering the network operational constraints and building thermal dynamics. The proposed optimization model optimizes not only the operating cost, including fuel cost, purchasing cost, battery degradation cost, voluntary load shedding cost and the cost associated with customer discomfort due to room temperature deviation from the set point, but also several performance indices, including voltage deviation, network power loss and power factor at the Point of Common Coupling (PCC). In particular, the detailed thermal dynamic model of buildings is integrated into the distribution optimal power flow (D-OPF)more » model for the optimal operation of community microgrids. The heating, ventilation and air-conditioning (HVAC) systems can be scheduled intelligently to reduce the electricity cost while maintaining the indoor temperature in the comfort range set by customers. Numerical simulation results show the effectiveness of the proposed model and significant saving in electricity cost could be achieved with network operational constraints satisfied.« less
1992-03-01
public release; distribution is unlimited. 2b. DECLASSIFICATION/DOWNGRADING SCHEDULE 4. PERFORMING ORGANIZATION REPORT NUMBER( S ) S . MONITORING...ORGANIZATION REPORT NUMBER( S ) Sa. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Naval Postgraduate School (If appikable...PERSONAL AUTHOR( S ) Coutteau, Charles G. 13a. TYPE OF REPORT 1 3b. TIME COVE RED 14. DATE OF REPORT (year, month, day) 1S. PAGE COUNT Master’s TheisI From
Environmental Management Performance Report June 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
EDER, D.M.
2000-06-01
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities asmore » extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.« less
Systems cost/performance analysis; study 2.3. Volume 3: Programmer's manual and user's guide
NASA Technical Reports Server (NTRS)
1975-01-01
The implementation of the entire systems cost/performance model as a digital computer program was studied. A discussion of the operating environment in which the program was written and checked, the program specifications such as discussions of logic and computational flow, the different subsystem models involved in the design of the spacecraft, and routines involved in the nondesign area such as costing and scheduling of the design were covered. Preliminary results for the DSCS-2 design are also included.
NASA Astrophysics Data System (ADS)
Vilja, John; Levack, Daniel
1993-04-01
The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.
Economics of human performance and systems total ownership cost.
Onkham, Wilawan; Karwowski, Waldemar; Ahram, Tareq Z
2012-01-01
Financial costs of investing in people is associated with training, acquisition, recruiting, and resolving human errors have a significant impact on increased total ownership costs. These costs can also affect the exaggerate budgets and delayed schedules. The study of human performance economical assessment in the system acquisition process enhances the visibility of hidden cost drivers which support program management informed decisions. This paper presents the literature review of human total ownership cost (HTOC) and cost impacts on overall system performance. Economic value assessment models such as cost benefit analysis, risk-cost tradeoff analysis, expected value of utility function analysis (EV), growth readiness matrix, multi-attribute utility technique, and multi-regressions model were introduced to reflect the HTOC and human performance-technology tradeoffs in terms of the dollar value. The human total ownership regression model introduces to address the influencing human performance cost component measurement. Results from this study will increase understanding of relevant cost drivers in the system acquisition process over the long term.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Can flexitime and other alternative work schedules cost the customer agency more? Yes, GSA customers who extend their regular work schedule by a system of flexible hours shall reimburse GSA for its... alternative work schedules cost the customer agency more? 102-85.170 Section 102-85.170 Public Contracts and...
48 CFR 1852.216-80 - Task ordering procedure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... specified in the schedule. The Contractor may incur costs under this contract in performance of task orders... contemplated task order. (2) Proposed performance standards to be used as criteria for determining whether the... the task order, including special instructions or other information necessary for performance of the...
Workflow as a Service in the Cloud: Architecture and Scheduling Algorithms.
Wang, Jianwu; Korambath, Prakashan; Altintas, Ilkay; Davis, Jim; Crawl, Daniel
2014-01-01
With more and more workflow systems adopting cloud as their execution environment, it becomes increasingly challenging on how to efficiently manage various workflows, virtual machines (VMs) and workflow execution on VM instances. To make the system scalable and easy-to-extend, we design a Workflow as a Service (WFaaS) architecture with independent services. A core part of the architecture is how to efficiently respond continuous workflow requests from users and schedule their executions in the cloud. Based on different targets, we propose four heuristic workflow scheduling algorithms for the WFaaS architecture, and analyze the differences and best usages of the algorithms in terms of performance, cost and the price/performance ratio via experimental studies.
NASA Technical Reports Server (NTRS)
Zimmerman, W. F.; Matijevic, J. R.
1987-01-01
Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints.
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling
NASA Technical Reports Server (NTRS)
Jaap, John; Phillips, Shaun
2005-01-01
As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... Change To Amend the NYSE Arca Options Fee Schedule To Change the Monthly Cost for Option Trading Permits... proposes to amend the NYSE Arca Options Fee Schedule (``Fee Schedule'') to change the monthly cost for... its Fee Schedule to change the monthly cost for OTPs. The Exchange proposes to make the change...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... Change Amending the NYSE Arca Options Fee Schedule To Change the Monthly Cost for Option Trading Permits... proposes to amend the NYSE Arca Options Fee Schedule (``Fee Schedule'') to change the monthly cost for... amend its Fee Schedule to change the monthly cost for OTPs. The Exchange proposes to make the change...
NASA Astrophysics Data System (ADS)
Mirabi, Mohammad; Fatemi Ghomi, S. M. T.; Jolai, F.
2014-04-01
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this paper develops a novel hybrid genetic algorithm (HGA) with three genetic operators. Proposed HGA applies a modified approach to generate a pool of initial solutions, and also uses an improved heuristic called the iterated swap procedure to improve the initial solutions. We consider the make-to-order production approach that some sequences between jobs are assumed as tabu based on maximum allowable setup cost. In addition, the results are compared to some recently developed heuristics and computational experimental results show that the proposed HGA performs very competitively with respect to accuracy and efficiency of solution.
NASA Technical Reports Server (NTRS)
Sherry, Lance; Ferguson, John; Hoffman, Karla; Donohue, George; Beradino, Frank
2012-01-01
This report describes the Airline Fleet, Route, and Schedule Optimization Model (AFRS-OM) that is designed to provide insights into airline decision-making with regards to markets served, schedule of flights on these markets, the type of aircraft assigned to each scheduled flight, load factors, airfares, and airline profits. The main inputs to the model are hedged fuel prices, airport capacity limits, and candidate markets. Embedded in the model are aircraft performance and associated cost factors, and willingness-to-pay (i.e. demand vs. airfare curves). Case studies demonstrate the application of the model for analysis of the effects of increased capacity and changes in operating costs (e.g. fuel prices). Although there are differences between airports (due to differences in the magnitude of travel demand and sensitivity to airfare), the system is more sensitive to changes in fuel prices than capacity. Further, the benefits of modernization in the form of increased capacity could be undermined by increases in hedged fuel prices
Cloud computing task scheduling strategy based on improved differential evolution algorithm
NASA Astrophysics Data System (ADS)
Ge, Junwei; He, Qian; Fang, Yiqiu
2017-04-01
In order to optimize the cloud computing task scheduling scheme, an improved differential evolution algorithm for cloud computing task scheduling is proposed. Firstly, the cloud computing task scheduling model, according to the model of the fitness function, and then used improved optimization calculation of the fitness function of the evolutionary algorithm, according to the evolution of generation of dynamic selection strategy through dynamic mutation strategy to ensure the global and local search ability. The performance test experiment was carried out in the CloudSim simulation platform, the experimental results show that the improved differential evolution algorithm can reduce the cloud computing task execution time and user cost saving, good implementation of the optimal scheduling of cloud computing tasks.
32 CFR 701.53 - FOIA fee schedule.
Code of Federal Regulations, 2014 CFR
2014-07-01
... human time) and machine time. (1) Human time. Human time is all the time spent by humans performing the...) Machine time. Machine time involves only direct costs of the central processing unit (CPU), input/output... exist to calculate CPU time, no machine costs can be passed on to the requester. When CPU calculations...
32 CFR 701.53 - FOIA fee schedule.
Code of Federal Regulations, 2012 CFR
2012-07-01
... human time) and machine time. (1) Human time. Human time is all the time spent by humans performing the...) Machine time. Machine time involves only direct costs of the central processing unit (CPU), input/output... exist to calculate CPU time, no machine costs can be passed on to the requester. When CPU calculations...
32 CFR 701.53 - FOIA fee schedule.
Code of Federal Regulations, 2013 CFR
2013-07-01
... human time) and machine time. (1) Human time. Human time is all the time spent by humans performing the...) Machine time. Machine time involves only direct costs of the central processing unit (CPU), input/output... exist to calculate CPU time, no machine costs can be passed on to the requester. When CPU calculations...
Space shuttle solid rocket booster cost-per-flight analysis technique
NASA Technical Reports Server (NTRS)
Forney, J. A.
1979-01-01
A cost per flight computer model is described which considers: traffic model, component attrition, hardware useful life, turnaround time for refurbishment, manufacturing rates, learning curves on the time to perform tasks, cost improvement curves on quantity hardware buys, inflation, spares philosophy, long lead, hardware funding requirements, and other logistics and scheduling constraints. Additional uses of the model include assessing the cost per flight impact of changing major space shuttle program parameters and searching for opportunities to make cost effective management decisions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Yishen; Zhou, Zhi; Liu, Cong
2016-08-01
As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides amore » reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.« less
A Cost Comparison Between Active and Naval Reserve Force FFG 7 Class Ships
1993-06-01
so in our hypothetical depreciation schedule 1/30th of the depreciable cost would be expensed each year. Under GAAP , the historical cost of the asset...and Support Costs (VAMOSC) data base provided by the* aval Center For Cost Analysis. The thesis also sets up theoretical depreciation schedules for...VAMOSC) data base provided by the Naval Center for Cost Analysis. The thesis also sets up theoretical depreciation schedules for selected ships to
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1998-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.
Machine Learning Based Online Performance Prediction for Runtime Parallelization and Task Scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, J; Ma, X; Singh, K
2008-10-09
With the emerging many-core paradigm, parallel programming must extend beyond its traditional realm of scientific applications. Converting existing sequential applications as well as developing next-generation software requires assistance from hardware, compilers and runtime systems to exploit parallelism transparently within applications. These systems must decompose applications into tasks that can be executed in parallel and then schedule those tasks to minimize load imbalance. However, many systems lack a priori knowledge about the execution time of all tasks to perform effective load balancing with low scheduling overhead. In this paper, we approach this fundamental problem using machine learning techniques first to generatemore » performance models for all tasks and then applying those models to perform automatic performance prediction across program executions. We also extend an existing scheduling algorithm to use generated task cost estimates for online task partitioning and scheduling. We implement the above techniques in the pR framework, which transparently parallelizes scripts in the popular R language, and evaluate their performance and overhead with both a real-world application and a large number of synthetic representative test scripts. Our experimental results show that our proposed approach significantly improves task partitioning and scheduling, with maximum improvements of 21.8%, 40.3% and 22.1% and average improvements of 15.9%, 16.9% and 4.2% for LMM (a real R application) and synthetic test cases with independent and dependent tasks, respectively.« less
A Technical Survey on Optimization of Processing Geo Distributed Data
NASA Astrophysics Data System (ADS)
Naga Malleswari, T. Y. J.; Ushasukhanya, S.; Nithyakalyani, A.; Girija, S.
2018-04-01
With growing cloud services and technology, there is growth in some geographically distributed data centers to store large amounts of data. Analysis of geo-distributed data is required in various services for data processing, storage of essential information, etc., processing this geo-distributed data and performing analytics on this data is a challenging task. The distributed data processing is accompanied by issues in storage, computation and communication. The key issues to be dealt with are time efficiency, cost minimization, utility maximization. This paper describes various optimization methods like end-to-end multiphase, G-MR, etc., using the techniques like Map-Reduce, CDS (Community Detection based Scheduling), ROUT, Workload-Aware Scheduling, SAGE, AMP (Ant Colony Optimization) to handle these issues. In this paper various optimization methods and techniques used are analyzed. It has been observed that end-to end multiphase achieves time efficiency; Cost minimization concentrates to achieve Quality of Service, Computation and reduction of Communication cost. SAGE achieves performance improvisation in processing geo-distributed data sets.
CrossTalk: The Journal of Defense Software Engineering. Volume 21, Number 4
2008-04-01
stability characteristics to those extensively reported for the Cost Performance Index in Earned Value Management . by Kym Henderson and Dr. Ofer...Zwikael Schedule Adherence:A Useful Measure for Project Management This article utilizes the new practice of Earned Schedule to discuss a proposed...measure for further enhancing the practice of Earned Value Management . by Walt Lipke A Review of Boundary Value Analysis Techniques This article reviews
Workflow as a Service in the Cloud: Architecture and Scheduling Algorithms
Wang, Jianwu; Korambath, Prakashan; Altintas, Ilkay; Davis, Jim; Crawl, Daniel
2017-01-01
With more and more workflow systems adopting cloud as their execution environment, it becomes increasingly challenging on how to efficiently manage various workflows, virtual machines (VMs) and workflow execution on VM instances. To make the system scalable and easy-to-extend, we design a Workflow as a Service (WFaaS) architecture with independent services. A core part of the architecture is how to efficiently respond continuous workflow requests from users and schedule their executions in the cloud. Based on different targets, we propose four heuristic workflow scheduling algorithms for the WFaaS architecture, and analyze the differences and best usages of the algorithms in terms of performance, cost and the price/performance ratio via experimental studies. PMID:29399237
Low-cost, portable fire hose tester
NASA Technical Reports Server (NTRS)
Jocke, R. F.; Miller, R. E.
1975-01-01
Availability of pumping unit permits scheduling and performing required periodic hose tests in proper manner while retaining full fire equipment readiness. Use of pumping unit preserves operating life and capability of pumper truck.
2017-02-01
to cost increases and schedule delays and (2) what is known about the costs of benefits foregone because of project delays. GAO compared the...Contributors to Cost Increases and Schedule Delays 13 Total Cost of Benefits Foregone from Project Delays at Olmsted Is Uncertain 27 Agency Comments...would take 7 years. The Corps also estimated benefits , such as transportation cost savings, associated with the project. However, once the project was
A strategy of cost control for Mariner Venus/Mercury 1973
NASA Technical Reports Server (NTRS)
Biggs, John R.; Downhower, Walter J.
1994-01-01
The spacecraft launched by NASA on November 3, 1973 to explore Venus and Mercury proved a notable success as a development project both in space and on the ground. This article on the development points our management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads. The Mariner Venus/Mercury '73 (MVM '73) project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology--on the part of people at NASA, JPL, and The Boeing Co. (the contractor).
Tsifetaki, Niki; Migkos, Michail P; Papagoras, Charalampos; Voulgari, Paraskevi V; Athanasakis, Kostas; Drosos, Alexandros A
2015-06-01
To investigate the total annual direct cost of patients with spondyloarthritis (SpA) in Greece. Retrospective study with 156 patients diagnosed and followed up in the rheumatology clinic of the University Hospital of Ioannina. Sixty-four had ankylosing spondylitis (AS) and 92 had psoriatic arthritis (PsA). Health resource use for each patient was elicited through a retrospective chart review that documented the use of monitoring visits, medications, laboratory/diagnostic tests, and inpatient stays for the previous year from the date that the review took place. Costs were calculated from a third-party payer perspective and are reported in 2014 euros. The mean ± SD annual direct cost for the patients with SpA reached €8680 ± 6627. For the patients with PsA and AS, the cost was estimated to be €8097 ± 6802 and €9531 ± 6322, respectively. The major cost was medication, which represented 88.9%, 88.2%, and 89.3% of the mean total direct cost for SpA, AS, and PsA, respectively. The annual amount of the scheduled tests for all patients corresponded to 7.5%, and for those performed on an emergency basis, 1.1%. Further, the cost for scheduled and emergency hospitalization, as well as the cost of scheduled visits to an outpatient clinic, corresponded to 2.5% of the mean total annual direct cost for the patients with SpA. SpA carries substantial financial cost, especially in the era of new treatment options. Adequate access and treatment for patients with SpA remains a necessity, even in times of fiscal constraint. Thus, the recommendations of the international scientific organizations should be considered when administering high-cost drugs such as biological treatments.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk
NASA Technical Reports Server (NTRS)
Hansen, Patricia A.; Day, Diane; Secunda, Mark
2003-01-01
The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.
The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk
NASA Technical Reports Server (NTRS)
Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.
2004-01-01
The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.
NASA Earned Value Management (EVM) Update
NASA Technical Reports Server (NTRS)
Kerby, Jerald
2013-01-01
Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.
Cost-efficient scheduling of FAST observations
NASA Astrophysics Data System (ADS)
Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi
2018-03-01
A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.
NASA Technical Reports Server (NTRS)
Kerby, Jerald; Counts, Stacy
2005-01-01
IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.
Process-based Cost Estimation for Ramjet/Scramjet Engines
NASA Technical Reports Server (NTRS)
Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John
2003-01-01
Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
NASA Technical Reports Server (NTRS)
Newman, J. J.; Grimes, D. W.; Gaetano, F. W.
1973-01-01
Discussion of management techniques that make it possible to overcome inflationary and developmental cost rises while holding schedule and performance fixed in scientific space programs. The techniques reviewed pertain to high personnel motivation, continual review of contract rigidity for de facto modification by senior judgment, standardization vs design innovation, cooperative customer/contractor goal orientation vs task orientation, and deep real-time management visibility.
NASA Astrophysics Data System (ADS)
Louzon, E.
1989-12-01
Quality, cost, and schedule are three factors affecting the competitiveness of a company; they require balancing so that products of acceptable quality are delivered, on time and at a competitive cost. Quality costs comprise investment in quality maintenance and failure costs which arise from failure to maintain standards. The basic principle for achieving the required quality at minimum cost is that of prevention of failures, etc., through production control, attention to manufacturing practices, and appropriate management and training. Total quality control involves attention to the product throughout its life cycle, including in-service performance evaluation, servicing, and maintenance.
Gain-Scheduled Complementary Filter Design for a MEMS Based Attitude and Heading Reference System
Yoo, Tae Suk; Hong, Sung Kyung; Yoon, Hyok Min; Park, Sungsu
2011-01-01
This paper describes a robust and simple algorithm for an attitude and heading reference system (AHRS) based on low-cost MEMS inertial and magnetic sensors. The proposed approach relies on a gain-scheduled complementary filter, augmented by an acceleration-based switching architecture to yield robust performance, even when the vehicle is subject to strong accelerations. Experimental results are provided for a road captive test during which the vehicle dynamics are in high-acceleration mode and the performance of the proposed filter is evaluated against the output from a conventional linear complementary filter. PMID:22163824
Research requirements for development of regenerative engines for helicopters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Semple, R.D.
1976-12-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Research requirements for development of regenerative engines for helicopters
NASA Technical Reports Server (NTRS)
Semple, R. D.
1976-01-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Wang, Xiao Jun; Saha, Ashwini; Zhang, Xu-Hao
2017-01-01
Currently, two pediatric pneumococcal conjugate vaccines are available in the private market of Malaysia-13-valent pneumococcal conjugate vaccine (PCV13) and pneumococcal polysaccharide and non-typeable Haemophilus influenzae protein D conjugate vaccine (PHiD-CV). This study aimed to evaluate the cost-effectiveness of a universal mass vaccination program with a PHiD-CV 2+1 schedule versus no vaccination or with a PCV13 2+1 schedule in Malaysia. A published Markov cohort model was adapted to evaluate the epidemiological and economic consequences of programs with no vaccination, a PHiD-CV 2+1 schedule or a PCV13 2+1 schedule over a 10-year time horizon. Disease cases, deaths, direct medical costs, quality-adjusted life-years (QALYs) and incremental cost-effectiveness ratios (ICERs) were estimated. Locally published epidemiology and cost data were used whenever possible. Vaccine effectiveness and disutility data were based on the best available published data. All data inputs and assumptions were validated by local clinical and health economics experts. Analyses were conducted from the perspective of the Malaysian government for a birth cohort of 508,774. Costs and QALYs were discounted at 3% per annum. One-way and probabilistic sensitivity analyses were performed. Compared with no vaccination, a PHiD-CV 2+1 program was projected to prevent 1109 invasive pneumococcal disease (IPD), 24,679 pneumonia and 72,940 acute otitis media (AOM) cases and 103 IPD/pneumonia deaths over 10 years, with additional costs and QALYs of United States dollars (USD) 30.9 million and 1084 QALYs, respectively, at an ICER of USD 28,497/QALY. Compared with a PCV13 2+1 program, PHiD-CV 2+1 was projected to result in similar reductions in IPD cases (40 cases more) but significantly fewer AOM cases (30,001 cases less), with cost savings and additional QALYs gained of USD 5.2 million and 116 QALYs, respectively, demonstrating dominance over PCV13. Results were robust to variations in one-way and probabilistic sensitivity analyses. A PHiD-CV 2+1 universal mass vaccination program could substantially reduce pneumococcal disease burden versus no vaccination, and was expected to be cost-effective in Malaysia. A PHiD-CV 2+1 program was also expected to be a dominant choice over a PCV13 2+1 program in Malaysia.
A new distributed systems scheduling algorithm: a swarm intelligence approach
NASA Astrophysics Data System (ADS)
Haghi Kashani, Mostafa; Sarvizadeh, Raheleh; Jameii, Mahdi
2011-12-01
The scheduling problem in distributed systems is known as an NP-complete problem, and methods based on heuristic or metaheuristic search have been proposed to obtain optimal and suboptimal solutions. The task scheduling is a key factor for distributed systems to gain better performance. In this paper, an efficient method based on memetic algorithm is developed to solve the problem of distributed systems scheduling. With regard to load balancing efficiently, Artificial Bee Colony (ABC) has been applied as local search in the proposed memetic algorithm. The proposed method has been compared to existing memetic-Based approach in which Learning Automata method has been used as local search. The results demonstrated that the proposed method outperform the above mentioned method in terms of communication cost.
Space station needs, attributes, and architectural options study. Volume 3: Cost and benefits
NASA Technical Reports Server (NTRS)
1983-01-01
Cost and schedule, cost/incremental capability, and schedule impact analyses are presented. Quantifiable benefits, space technology, non-quantifiable benefits, and space commercialization are addressed.
Incremental Scheduling Engines for Human Exploration of the Cosmos
NASA Technical Reports Server (NTRS)
Jaap, John; Phillips, Shaun
2005-01-01
As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.
Satellite voice broadcast. Volume 2: System study
NASA Technical Reports Server (NTRS)
Bachtell, E. E.; Bettadapur, S. S.; Coyner, J. V.; Farrell, C. E.
1985-01-01
The Technical Volume of the Satellite Broadcast System Study is presented. Designs are synthesized for direct sound broadcast satellite systems for HF-, VHF-, L-, and Ku-bands. Methods are developed and used to predict satellite weight, volume, and RF performance for the various concepts considered. Cost and schedule risk assessments are performed to predict time and cost required to implement selected concepts. Technology assessments and tradeoffs are made to identify critical enabling technologies that require development to bring technical risk to acceptable levels for full scale development.
Idea Bank: Summer Music Programs for Students.
ERIC Educational Resources Information Center
Anderson, Tom; And Others
1989-01-01
Describes the elements of high quality summer music programs for students. Points out considerations for selection of a summer music camp, including setting daily schedule, amount of performance and private lessons, cost, faculty, and program scope. (LS)
Increasing operating room productivity by duration categories and a newsvendor model.
Lehtonen, Juha-Matti; Torkki, Paulus; Peltokorpi, Antti; Moilanen, Teemu
2013-01-01
Previous studies approach surgery scheduling mainly from the mathematical modeling perspective which is often hard to apply in a practical environment. The aim of this study is to develop a practical scheduling system that considers the advantages of both surgery categorization and newsvendor model to surgery scheduling. The research was carried out in a Finnish orthopaedic specialist centre that performs only joint replacement surgery. Four surgery categorization scenarios were defined and their productivity analyzed by simulation and newsvendor model. Detailed analyses of surgery durations and the use of more accurate case categories and their combinations in scheduling improved OR productivity 11.3 percent when compared to the base case. Planning to have one OR team to work longer led to remarkable decrease in scheduling inefficiency. In surgical services, productivity and cost-efficiency can be improved by utilizing historical data in case scheduling and by increasing flexibility in personnel management. The study increases the understanding of practical scheduling methods used to improve efficiency in surgical services.
The Development of Patient Scheduling Groups for an Effective Appointment System
2016-01-01
Summary Background Patient access to care and long wait times has been identified as major problems in outpatient delivery systems. These aspects impact medical staff productivity, service quality, clinic efficiency, and health-care cost. Objectives This study proposed to redesign existing patient types into scheduling groups so that the total cost of clinic flow and scheduling flexibility was minimized. The optimal scheduling group aimed to improve clinic efficiency and accessibility. Methods The proposed approach used the simulation optimization technique and was demonstrated in a Primary Care physician clinic. Patient type included, emergency/urgent care (ER/UC), follow-up (FU), new patient (NP), office visit (OV), physical exam (PE), and well child care (WCC). One scheduling group was designed for this physician. The approach steps were to collect physician treatment time data for each patient type, form the possible scheduling groups, simulate daily clinic flow and patient appointment requests, calculate costs of clinic flow as well as appointment flexibility, and find the scheduling group that minimized the total cost. Results The cost of clinic flow was minimized at the scheduling group of four, an 8.3% reduction from the group of one. The four groups were: 1. WCC, 2. OV, 3. FU and ER/UC, and 4. PE and NP. The cost of flexibility was always minimized at the group of one. The total cost was minimized at the group of two. WCC was considered separate and the others were grouped together. The total cost reduction was 1.3% from the group of one. Conclusions This study provided an alternative method of redesigning patient scheduling groups to address the impact on both clinic flow and appointment accessibility. Balance between them ensured the feasibility to the recognized issues of patient service and access to care. The robustness of the proposed method on the changes of clinic conditions was also discussed. PMID:27081406
Techniques for cash management in scheduling manufacturing operations
NASA Astrophysics Data System (ADS)
Morady Gohareh, Mehdy; Shams Gharneh, Naser; Ghasemy Yaghin, Reza
2017-06-01
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order of costs and breaking ties in decreasing order of prices maximizes the latter and creates protection against financial instability.
Understanding London's Water Supply Tradeoffs When Scheduling Interventions Under Deep Uncertainty
NASA Astrophysics Data System (ADS)
Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.
2015-12-01
Water supply planning in many major world cities faces several challenges associated with but not limited to climate change, population growth and insufficient land availability for infrastructure development. Long-term plans to maintain supply-demand balance and ecosystem services require careful consideration of uncertainties associated with future conditions. The current approach for London's water supply planning utilizes least cost optimization of future intervention schedules with limited uncertainty consideration. Recently, the focus of the long-term plans has shifted from solely least cost performance to robustness and resilience of the system. Identifying robust scheduling of interventions requires optimizing over a statistically representative sample of stochastic inputs which may be computationally difficult to achieve. In this study we optimize schedules using an ensemble of plausible scenarios and assess how manipulating that ensemble influences the different Pareto-approximate intervention schedules. We investigate how a major stress event's location in time as well as the optimization problem formulation influence the Pareto-approximate schedules. A bootstrapping method that respects the non-stationary trend of climate change scenarios and ensures the even distribution of the major stress event in the scenario ensemble is proposed. Different bootstrapped hydrological scenario ensembles are assessed using many-objective scenario optimization of London's future water supply and demand intervention scheduling. However, such a "fixed" scheduling of interventions approach does not aim to embed flexibility or adapt effectively as the future unfolds. Alternatively, making decisions based on the observations of occurred conditions could help planners who prefer adaptive planning. We will show how rules to guide the implementation of interventions based on observations may result in more flexible strategies.
Scheduling and rescheduling with iterative repair
NASA Technical Reports Server (NTRS)
Zweben, Monte; Davis, Eugene; Daun, Brian; Deale, Michael
1992-01-01
This paper describes the GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle Ground Processing. The system uses constraint-based iterative repair, a technique that starts with a complete but possibly flawed schedule and iteratively improves it by using constraint knowledge within repair heuristics. In this paper we explore the tradeoff between the informedness and the computational cost of several repair heuristics. We show empirically that some knowledge can greatly improve the convergence speed of a repair-based system, but that too much knowledge, such as the knowledge embodied within the MIN-CONFLICTS lookahead heuristic, can overwhelm a system and result in degraded performance.
ERIC Educational Resources Information Center
Stone, Deborah L.; Villachica, Steven W.
2003-01-01
Provides suggestions to ensure the success of electronic performance support systems (EPSS) and electronic learning, including creating hybrid solutions; aligning EPSS with business objectives and performance requirements; change management efforts; and rapid application development to lower costs, shrink schedules, and improve quality.…
A Methodology for Making Early Comparative Architecture Performance Evaluations
ERIC Educational Resources Information Center
Doyle, Gerald S.
2010-01-01
Complex and expensive systems' development suffers from a lack of method for making good system-architecture-selection decisions early in the development process. Failure to make a good system-architecture-selection decision increases the risk that a development effort will not meet cost, performance and schedule goals. This research provides a…
Longman, Cai S; Lavric, Aureliu; Monsell, Stephen
2017-06-01
The performance overhead associated with changing tasks (the "switch cost") usually diminishes when the task is specified in advance but is rarely eliminated by preparation. A popular account of the "residual" (asymptotic) switch cost is that it reflects "task-set inertia": carry-over of task-set parameters from the preceding trial(s). New evidence for a component of "task-set inertia" comes from eye-tracking, where the location associated with the previously (but no longer) relevant task is fixated preferentially over other irrelevant locations, even when preparation intervals are generous. Might such limits in overcoming task-set inertia in general, and "attentional inertia" in particular, result from suboptimal scheduling of preparation when the time available is outside one's control? In the present study, the stimulus comprised 3 digits located at the points of an invisible triangle, preceded by a central verbal cue specifying which of 3 classification tasks to perform, each consistently applied to just 1 digit location. The digits were presented only when fixation moved away from the cue, thus giving the participant control over preparation time. In contrast to our previous research with experimenter-determined preparation intervals, we found no sign of attentional inertia for the long preparation intervals. Self-paced preparation reduced but did not eliminate the performance switch cost-leaving a clear residual component in both reaction time and error rates. That the scheduling of preparation accounts for some, but not all, components of the residual switch cost, challenges existing accounts of the switch cost, even those which distinguish between preparatory and poststimulus reconfiguration processes. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
Matching Judicial Supervision to Clients’ Risk Status in Drug Court
Marlowe, Douglas B.; Festinger, David S.; Lee, Patricia A.; Dugosh, Karen L.; Benasutti, Kathleen M.
2007-01-01
This article reports outcomes from a program of experimental research evaluating the risk principle in drug courts. Prior studies revealed that participants who were high risk and had (a) antisocial personality disorder or (b) a prior history of drug abuse treatment performed better in drug court when scheduled to attend biweekly judicial status hearings in court. In contrast, participants who were low risk performed equivalently regardless of the court hearings schedule. This study prospectively matches drug court clients to the optimal schedule of court hearings based on an assessment of their risk status and compares outcomes to clients randomly assigned to the standard hearings schedule. Results confirmed that participants who were high risk and matched to biweekly hearings had better during-treatment outcomes than participants assigned to status hearings as usual. These findings provide confirmation of the risk principle in drug courts and yield practical information for enhancing the efficacy and cost-efficiency of drug courts. PMID:18174915
Strategies for SEE Hardness Assurance From Buy-It-And-Fly-It to Bullet Proof
NASA Technical Reports Server (NTRS)
Ladbury, Raymond
2017-01-01
This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risksor worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.
Strategies for SEE Hardness Assurance - From Buy-It-And-Fly-It to Bullet Proof
NASA Technical Reports Server (NTRS)
Ladbury, Ray
2017-01-01
This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risks or worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.
CNA Independent Assessment: Air Force Acquisition. Return to Excellence
2009-02-01
symptoms that indicate problems with its acquisition system and processes. Some of the most pressing of these symptoms have been: Numerous cost...indicate problems with its acquisition system and proc- esses. Some of the most pressing of these symptoms have been: Frequent cost-schedule performance...Military Deputy MS Milestone NAVAIR Naval Air Systems Command PAR Program Assessment Review PCO Principal Contracting Officer PDR
Mass and power modeling of communication satellites
NASA Technical Reports Server (NTRS)
Price, Kent M.; Pidgeon, David; Tsao, Alex
1991-01-01
Analytic estimating relationships for the mass and power requirements for major satellite subsystems are described. The model for each subsystem is keyed to the performance drivers and system requirements that influence their selection and use. Guidelines are also given for choosing among alternative technologies which accounts for other significant variables such as cost, risk, schedule, operations, heritage, and life requirements. These models are intended for application to first order systems analyses, where resources do not warrant detailed development of a communications system scenario. Given this ground rule, the models are simplified to 'smoothed' representation of reality. Therefore, the user is cautioned that cost, schedule, and risk may be significantly impacted where interpolations are sufficiently different from existing hardware as to warrant development of new devices.
Relocation of the Cryo-Test Facility to NASA-MSFC
NASA Technical Reports Server (NTRS)
Sisco, Jimmy D.; McConnaughey, Paul K. (Technical Monitor)
2002-01-01
The Environmental Test Facility (ETF), located at NASA-Marshall Space Flight Center, Huntsville, Alabama, has provided thermal vacuum testing for several major programs since the 1960's. The ETF consists of over 13 thermal vacuum chambers sized and configured to handle the majority of test payloads. Testing is performed around the clock with multiple tests being conducted simultaneously. Chamber selection to achieve the best match with test articles and juggling program schedules, at times, can be a challenge. The ETF's Sunspot chamber has had tests scheduled and operated back-to-back for several years and provides the majority of schedule conflicts. Future test programs have been identified which surpass the current Sunspot availability. This paper describes a very low cost alternate to reduce schedule conflicts by utilizing government excess equipment
Dietz, Dennis C.
2014-01-01
A cogent method is presented for computing the expected cost of an appointment schedule where customers are statistically identical, the service time distribution has known mean and variance, and customer no-shows occur with time-dependent probability. The approach is computationally efficient and can be easily implemented to evaluate candidate schedules within a schedule optimization algorithm. PMID:24605070
1985-09-01
4 C/SCSC Terms and Definitions ...... ..... 5 Cost Performance Report Analysis (CPA) Progrra" m 6 Description of CPRA Terms and Formulas...hypotheses are: 1 2 C2: al’ 02 ’ The test statistic is then calculated as: F* (( SSEI + (nI - 2)) / (SSE 2 + (n 2 - 2))] The critical F value is: F(c, nl...353.90767 SIGNIF F = .0000 44 ,1 42 •.4 m . - .TABLE B.4 General Linear Test for EAC1 and EAC5 MEAN STD DEV CASES ECAC 827534.056 1202737.882 1630 EACS
Timed Transfer : An Evaluation of Its Structure, Performance and Cost
DOT National Transportation Integrated Search
1983-08-01
Timed transfer is a transit operating strategy in which vehicles from different routes are routed and scheduled to meet simultaneously at common stops to facilitate no-wait or minimum-wait passenger transfers. Timed transfers are being used primarily...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...
Combined truck routing and driver scheduling problems under hours of service regulations.
DOT National Transportation Integrated Search
2009-08-20
Regardless of changing variants, hours-of-service (HOS) regulations are intended to help truck drivers ensure get adequate rest and perform safe operations. The new HOS regulations, however, may lead to substantial cost increases for regional common ...
Reinventing The Design Process: Teams and Models
NASA Technical Reports Server (NTRS)
Wall, Stephen D.
1999-01-01
The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.
Hannan, M A; Akhtar, Mahmuda; Begum, R A; Basri, H; Hussain, A; Scavino, Edgar
2018-01-01
Waste collection widely depends on the route optimization problem that involves a large amount of expenditure in terms of capital, labor, and variable operational costs. Thus, the more waste collection route is optimized, the more reduction in different costs and environmental effect will be. This study proposes a modified particle swarm optimization (PSO) algorithm in a capacitated vehicle-routing problem (CVRP) model to determine the best waste collection and route optimization solutions. In this study, threshold waste level (TWL) and scheduling concepts are applied in the PSO-based CVRP model under different datasets. The obtained results from different datasets show that the proposed algorithmic CVRP model provides the best waste collection and route optimization in terms of travel distance, total waste, waste collection efficiency, and tightness at 70-75% of TWL. The obtained results for 1 week scheduling show that 70% of TWL performs better than all node consideration in terms of collected waste, distance, tightness, efficiency, fuel consumption, and cost. The proposed optimized model can serve as a valuable tool for waste collection and route optimization toward reducing socioeconomic and environmental impacts. Copyright © 2017 Elsevier Ltd. All rights reserved.
Yan, Chongjun; Tang, Jiafu; Jiang, Bowen; Fung, Richard Y K
2015-01-01
This paper compares the performance measures of traditional appointment scheduling (AS) with those of an open-access appointment scheduling (OA-AS) system with exponentially distributed service time. A queueing model is formulated for the traditional AS system with no-show probability. The OA-AS models assume that all patients who call before the session begins will show up for the appointment on time. Two types of OA-AS systems are considered: with a same-session policy and with a same-or-next-session policy. Numerical results indicate that the superiority of OA-AS systems is not as obvious as those under deterministic scenarios. The same-session system has a threshold of relative waiting cost, after which the traditional system always has higher total costs, and the same-or-next-session system is always preferable, except when the no-show probability or the weight of patients' waiting is low. It is concluded that open-access policies can be viewed as alternative approaches to mitigate the negative effects of no-show patients.
NASA Astrophysics Data System (ADS)
Tabrizi, Babak H.; Ghaderi, Seyed Farid
2016-09-01
Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.
Fast Missile Boat Project Planning using CPM and What If Analysis Method
NASA Astrophysics Data System (ADS)
Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.
2018-03-01
This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology
2016-04-30
success is measured as achieving technical performance and/or mission performance goals, coupled with customer (warfighter) satisfaction (De Wit, 1988...studies added criteria such as customer satisfaction , efficiency of execution, and effectiveness of the project organization (Pinto & Slevin, 1998...team and the user customer organization, management policy and project control. This clustering of success factors represents the amalgamation of the
NASA Technical Reports Server (NTRS)
Zabinsky, J. M.; Burnham, R. W.; Flora, C. C.; Gotlieb, P.; Grande, D. L.; Gunnarson, D. W.; Howard, W. M.; Hunt, D.; Jakubowski, G. W.; Johnson, P. E.
1975-01-01
An assessment of risk, in terms of delivery delays, cost overrun, and performance achievement, associated with the V/STOL technology airplane is presented. The risk is discussed in terms of weight, structure, aerodynamics, propulsion, mechanical drive, and flight controls. The analysis ensures that risks associated with the design and development of the airplane will be eliminated in the course of the program and a useful technology airplane that meets the predicted cost, schedule, and performance can be produced.
Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine.
Pérez, Eduardo; Ntaimo, Lewis; Malavé, César O; Bailey, Carla; McCormack, Peter
2013-12-01
The increased demand for medical diagnosis procedures has been recognized as one of the contributors to the rise of health care costs in the U.S. in the last few years. Nuclear medicine is a subspecialty of radiology that uses advanced technology and radiopharmaceuticals for the diagnosis and treatment of medical conditions. Procedures in nuclear medicine require the use of radiopharmaceuticals, are multi-step, and have to be performed under strict time window constraints. These characteristics make the scheduling of patients and resources in nuclear medicine challenging. In this work, we derive a stochastic online scheduling algorithm for patient and resource scheduling in nuclear medicine departments which take into account the time constraints imposed by the decay of the radiopharmaceuticals and the stochastic nature of the system when scheduling patients. We report on a computational study of the new methodology applied to a real clinic. We use both patient and clinic performance measures in our study. The results show that the new method schedules about 600 more patients per year on average than a scheduling policy that was used in practice by improving the way limited resources are managed at the clinic. The new methodology finds the best start time and resources to be used for each appointment. Furthermore, the new method decreases patient waiting time for an appointment by about two days on average.
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
2008-04-01
suitability would result in safer landings and reduced maintenance costs associated with an intended area of operations 2.1.2. Concept of... cost , integration, logistics, ownership, performance, schedule, and user perception. Criteria were developed for three timeframes—reflecting the end...analysis.. Changed runway finder back to six cardinal headings or user specified headings. Added NASA ACCA cloud recognition filter. Added switches for
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
Fu, Fang; Zhang, Tao
2016-01-01
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939
2008-03-01
order fulfillment visibility, Kanban deployment, inventory count can be made visually, machines and tool labeling, costs, preventive maintenance...order fulfillment, computer scheduling versus Kanban , pull versus push systems, flow time efficiencies, back room costs of scheduling, MRP costs
Silva, Bhagya Nathali; Khan, Murad; Han, Kijun
2018-02-25
The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.
Automatic programming via iterated local search for dynamic job shop scheduling.
Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen
2015-01-01
Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.
NASA Technical Reports Server (NTRS)
1979-01-01
Cost scheduling and funding data are presented for the reference design of the power extension package. Major schedule milestones are correlated with current Spacelab flight dates. Funding distributions provide for minimum expenditure during the first year of the project.
Laprise, Jean-François; Markowitz, Lauri E; Chesson, Harrell W; Drolet, Mélanie; Brisson, Marc
2016-09-01
A recent clinical trial using the 9-valent human papillomavirus virus (HPV) vaccine has shown that antibody responses after 2 doses are noninferior to those after 3 doses, suggesting that 2 and 3 doses may have comparable vaccine efficacy. We used an individual-based transmission-dynamic model to compare the population-level effectiveness and cost-effectiveness of 2- and 3-dose schedules of 9-valent HPV vaccine in the United States. Our model predicts that if 2 doses of 9-valent vaccine protect for ≥20 years, the additional benefits of a 3-dose schedule are small as compared to those of 2-dose schedules, and 2-dose schedules are likely much more cost-efficient than 3-dose schedules. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.
A Novel Collaboration to Reduce the Travel-Related Cost of Residency Interviewing.
Shappell, Eric; Fant, Abra; Schnapp, Benjamin; Craig, Jill P; Ahn, James; Babcock, Christine; Gisondi, Michael A
2017-04-01
Interviewing for residency is a complicated and often expensive endeavor. Literature has estimated interview costs of $4,000 to $15,000 per applicant, mostly attributable to travel and lodging. The authors sought to reduce these costs and improve the applicant interview experience by coordinating interview dates between two residency programs in Chicago, Illinois. Two emergency medicine residency programs scheduled contiguous interview dates for the 2015-2016 interview season. We used a survey to assess applicant experiences interviewing in Chicago and attitudes regarding coordinated scheduling. Data on utilization of coordinated dates were obtained from interview scheduling software. The target group for this intervention consisted of applicants from medical schools outside Illinois who completed interviews at both programs. Of the 158 applicants invited to both programs, 84 (53%) responded to the survey. Scheduling data were available for all applicants. The total estimated cost savings for target applicants coordinating interview dates was $13,950. The majority of target applicants reported that this intervention increased the ease of scheduling (84%), made them less likely to cancel the interview (82%), and saved them money (71%). Coordinated scheduling of interview dates was associated with significant estimated cost savings and was reviewed favorably by applicants across all measures of experience. Expanding use of this practice geographically and across specialties may further reduce the cost of interviewing for applicants.
Production of ELZM mirrors: performance coupled with attractive schedule, cost, and risk factors
NASA Astrophysics Data System (ADS)
Leys, Antoine; Hull, Tony; Westerhoff, Thomas
2016-08-01
Extreme light weighted ZERODUR Mirrors (ELZM) have been developed to exploit the superb thermal characteristics of ZERODUR. Coupled with up to date mechanical and optical fabrication methods this becomes an attractive technical approach. However the process of making mirror substrates has demonstrated to be unusually rapid and especially cost-effective. ELZM is aimed at the knee of the cost as a function of light weighting curve. ELZM mirrors are available at 88% light weighted. Together with their low risk, low cost production methods, this is presented as a strong option for NASA Explorer and Probe class missions.
2017-03-23
PUBLIC RELEASE; DISTRIBUTION UNLIMITED Using Multiple and Logistic Regression to Estimate the Median Will- Cost and Probability of Cost and... Cost and Probability of Cost and Schedule Overrun for Program Managers Ryan C. Trudelle Follow this and additional works at: https://scholar.afit.edu...afit.edu. Recommended Citation Trudelle, Ryan C., "Using Multiple and Logistic Regression to Estimate the Median Will- Cost and Probability of Cost and
A novel multi-item joint replenishment problem considering multiple type discounts.
Cui, Ligang; Zhang, Yajun; Deng, Jie; Xu, Maozeng
2018-01-01
In business replenishment, discount offers of multi-item may either provide different discount schedules with a single discount type, or provide schedules with multiple discount types. The paper investigates the joint effects of multiple discount schemes on the decisions of multi-item joint replenishment. In this paper, a joint replenishment problem (JRP) model, considering three discount (all-unit discount, incremental discount, total volume discount) offers simultaneously, is constructed to determine the basic cycle time and joint replenishment frequencies of multi-item. To solve the proposed problem, a heuristic algorithm is proposed to find the optimal solutions and the corresponding total cost of the JRP model. Numerical experiment is performed to test the algorithm and the computational results of JRPs under different discount combinations show different significance in the replenishment cost reduction.
Scheduling revisited workstations in integrated-circuit fabrication
NASA Technical Reports Server (NTRS)
Kline, Paul J.
1992-01-01
The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.
Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics
NASA Technical Reports Server (NTRS)
1983-01-01
The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.
O'Brien, Jeremy J; Stormann, Jeremy; Roche, Kelli; Cabral-Goncalves, Ines; Monks, Annamarie; Hallett, Donna; Mortele, Koenraad J
2017-02-01
The purpose of this study was to describe and evaluate the effect of focused process improvements on protocol selection and scheduling in the MRI division of a busy academic medical center, as measured by examination and room times, magnet fill rate, and potential revenue increases and cost savings to the department. Focused process improvements, led by a multidisciplinary team at a large academic medical center, were directed at streamlining MRI protocols and optimizing matching protocol ordering to scheduling while maintaining or improving image quality. Data were collected before (June 2013) and after (March 2015) implementation of focused process improvements and divided by subspecialty on type of examination, allotted examination time, actual examination time, and MRI parameters. Direct and indirect costs were compiled and analyzed in consultation with the business department. Data were compared with evaluated effects on selected outcome and efficiency measures, as well as revenue and cost considerations. Statistical analysis was performed using a t test. During the month of June 2013, 2145 MRI examinations were performed at our center; 2702 were performed in March 2015. Neuroradiology examinations were the most common (59% in June 2013, 56% in March 2015), followed by body examinations (25% and 27%). All protocols and parameters were analyzed and streamlined for each examination, with slice thickness, TR, and echo train length among the most adjusted parameters. Mean time per examination decreased from 43.4 minutes to 36.7 minutes, and mean room time per patient decreased from 46.3 to 43.6 minutes (p = 0.009). Potential revenue from increased throughput may yield up to $3 million yearly (at $800 net revenue per scan) or produce cost savings if the facility can reduce staffed scanner hours or the number of scanners in its fleet. Actual revenue and expense impacts depend on the facility's fixed and variable cost structure, payer contracts, MRI fleet composition, and unmet MRI demand. Focused process improvements in selecting MRI protocols and scheduling examinations significantly increased throughput in the MRI division, thereby increasing capacity and revenue. Shorter scan and department times may also improve patient experience.
A Near-Term, High-Confidence Heavy Lift Launch Vehicle
NASA Technical Reports Server (NTRS)
Rothschild, William J.; Talay, Theodore A.
2009-01-01
The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.
The Relationship Between Cost Growth and Schedule Growth
2003-01-01
Relationship between Cost Growth and Schedule Growth, 35th DoDCAS, SCEA 2002, Integrated Program Management Conference (IPMC) 2002, R. L. Coleman...currently valid OMB control number. 1. REPORT DATE 2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE The Relationship Between Cost...
Scheduling Operations for Massive Heterogeneous Clusters
NASA Technical Reports Server (NTRS)
Humphrey, John; Spagnoli, Kyle
2013-01-01
High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic execution framework, and the second is scalable linear algebra libraries that are built directly on the former.
NASA management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Peters, F.
1975-01-01
The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.
DORCA II: Dynamic operations requirements and cost analysis program
NASA Technical Reports Server (NTRS)
1976-01-01
Program is written to handle logistics of acquisition and transport of personnel, equipment, and services and to determine costs, transport schedules, acquisition schedules, and fuel requirements of cargo transport.
Approximate Dynamic Programming Algorithms for United States Air Force Officer Sustainment
2015-03-26
level of correction needed. While paying bonuses has an easily calculable cost, RIFs have more subtle costs. Mone (1994) discovered that in a steady...a regression is performed utilizing instrumental variables to minimize Bellman error. This algorithm uses a set of basis functions to approximate the...transitioned to an all-volunteer force. Charnes et al. (1972) utilize a goal programming model for General Schedule civilian manpower management in the
Identifying Acquisition Framing Assumptions Through Structured Deliberation
2014-01-01
and tracking them, the Office of the Secretary of Defense (OSD), and the Services may be able to better manage major risks to and expectations of...programs. An FA is any explicit or implicit assumption that is central in shaping cost, sched- ule, or performance expectations . FAs may change over the... expectations . This criterion means that FAs, when they fail or are incorrect, will have significant cost, schedule and/or per- formance effects on the
Cost/Effort Drivers and Decision Analysis
NASA Technical Reports Server (NTRS)
Seidel, Jonathan
2010-01-01
Engineering trade study analyses demand consideration of performance, cost and schedule impacts across the spectrum of alternative concepts and in direct reference to product requirements. Prior to detailed design, requirements are too often ill-defined (only goals ) and prone to creep, extending well beyond the Systems Requirements Review. Though lack of engineering design and definitive requirements inhibit the ability to perform detailed cost analyses, affordability trades still comprise the foundation of these future product decisions and must evolve in concert. This presentation excerpts results of the recent NASA subsonic Engine Concept Study for an Advanced Single Aisle Transport to demonstrate an affordability evaluation of performance characteristics and the subsequent impacts on engine architecture decisions. Applying the Process Based Economic Analysis Tool (PBEAT), development cost, production cost, as well as operation and support costs were considered in a traditional weighted ranking of the following system-level figures of merit: mission fuel burn, take-off noise, NOx emissions, and cruise speed. Weighting factors were varied to ascertain the architecture ranking sensitivities to these performance figures of merit with companion cost considerations. A more detailed examination of supersonic variable cycle engine cost is also briefly presented, with observations and recommendations for further refinements.
NASA Technical Reports Server (NTRS)
Garrocq, C. A.; Hurley, M. J.; Dublin, M.
1973-01-01
A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... respond to an FOIA request. Direct costs include, for example, the salary of the employee performing work... programs of scholarly research. (5) Non-commercial scientific institution means an institution that is not... solely for the purpose of conducting scientific research, the results of which are not intended to...
1170 MW/sub t/ HTGR steamer cogeneration plant: design and cost study
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
A conceptual design and cost study is presented for intermediate size high temperature gas-cooled reactor (HTGR) for industrial energy applications performed by United Engineers and Constructors Inc., (UE and C) and The General Atomic Company (GAC). The study is part of a program at ORNL and has the objective to provide support in the evaluation of the technical and economic feasibility of a single unit 1170 MW/sub t/ HTGR steam cycle cogeneration plant (referred to as the Steamer plant) for the production of industrial process energy. Inherent in the achievement of this objective, it was essential to perform a numbermore » of basic tasks such as the development of plant concept, capital cost estimate, project schedule and annual operation and maintenance (O and M) cost.« less
Accelerating Large Scale Image Analyses on Parallel, CPU-GPU Equipped Systems
Teodoro, George; Kurc, Tahsin M.; Pan, Tony; Cooper, Lee A.D.; Kong, Jun; Widener, Patrick; Saltz, Joel H.
2014-01-01
The past decade has witnessed a major paradigm shift in high performance computing with the introduction of accelerators as general purpose processors. These computing devices make available very high parallel computing power at low cost and power consumption, transforming current high performance platforms into heterogeneous CPU-GPU equipped systems. Although the theoretical performance achieved by these hybrid systems is impressive, taking practical advantage of this computing power remains a very challenging problem. Most applications are still deployed to either GPU or CPU, leaving the other resource under- or un-utilized. In this paper, we propose, implement, and evaluate a performance aware scheduling technique along with optimizations to make efficient collaborative use of CPUs and GPUs on a parallel system. In the context of feature computations in large scale image analysis applications, our evaluations show that intelligently co-scheduling CPUs and GPUs can significantly improve performance over GPU-only or multi-core CPU-only approaches. PMID:25419545
Heber Binary Project. Binary Cycle Geothermal Demonstration Power Plant (RP1900-1)
NASA Astrophysics Data System (ADS)
Lacy, R. G.; Nelson, T. T.
1982-12-01
The Heber Binary Project (1) demonstrates the potential of moderate temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology; (2) allows the scaling up and evaluation of the performance of binary cycle technology in geothermal service; (3) establishes schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants; and (4) resolves uncertainties associated with the reservoir performance, plant operation, and economics.
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
Cost-Effectiveness Analysis of the Spanish Renal Replacement Therapy Program
Villa, Guillermo; Fernández–Ortiz, Lucía; Cuervo, Jesús; Rebollo, Pablo; Selgas, Rafael; González, Teresa; Arrieta, Javier
2012-01-01
♦ Background: We undertook a cost-effectiveness analysis of the Spanish Renal Replacement Therapy (RRT) program for end-stage renal disease patients from a societal perspective. The current Spanish situation was compared with several hypothetical scenarios. ♦ Methods: A Markov chain model was used as a foundation for simulations of the Spanish RRT program in three temporal horizons (5, 10, and 15 years). The current situation (scenario 1) was compared with three different scenarios: increased proportion of overall scheduled (planned) incident patients (scenario 2); constant proportion of overall scheduled incident patients, but increased proportion of scheduled incident patients on peritoneal dialysis (PD), resulting in a lower proportion of scheduled incident patients on hemodialysis (HD) (scenario 3); and increased overall proportion of scheduled incident patients together with increased scheduled incidence of patients on PD (scenario 4). ♦ Results: The incremental cost-effectiveness ratios (ICERs) of scenarios 2, 3, and 4, when compared with scenario 1, were estimated to be, respectively, –€83 150, –€354 977, and –€235 886 per incremental quality-adjusted life year (ΔQALY), evidencing both moderate cost savings and slight effectiveness gains. The net health benefits that would accrue to society were estimated to be, respectively, 0.0045, 0.0211, and 0.0219 ΔQALYs considering a willingness-to-pay threshold of €35 000/ΔQALY. ♦ Conclusions: Scenario 1, the current Spanish situation, was dominated by all the proposed scenarios. Interestingly, scenarios 3 and 4 showed the best results in terms of cost-effectiveness. From a cost-effectiveness perspective, an increase in the overall scheduled incidence of RRT, and particularly that of PD, should be promoted. PMID:21965620
Li, Xuejun; Xu, Jia; Yang, Yun
2015-01-01
Cloud workflow system is a kind of platform service based on cloud computing. It facilitates the automation of workflow applications. Between cloud workflow system and its counterparts, market-oriented business model is one of the most prominent factors. The optimization of task-level scheduling in cloud workflow system is a hot topic. As the scheduling is a NP problem, Ant Colony Optimization (ACO) and Particle Swarm Optimization (PSO) have been proposed to optimize the cost. However, they have the characteristic of premature convergence in optimization process and therefore cannot effectively reduce the cost. To solve these problems, Chaotic Particle Swarm Optimization (CPSO) algorithm with chaotic sequence and adaptive inertia weight factor is applied to present the task-level scheduling. Chaotic sequence with high randomness improves the diversity of solutions, and its regularity assures a good global convergence. Adaptive inertia weight factor depends on the estimate value of cost. It makes the scheduling avoid premature convergence by properly balancing between global and local exploration. The experimental simulation shows that the cost obtained by our scheduling is always lower than the other two representative counterparts.
Li, Xuejun; Xu, Jia; Yang, Yun
2015-01-01
Cloud workflow system is a kind of platform service based on cloud computing. It facilitates the automation of workflow applications. Between cloud workflow system and its counterparts, market-oriented business model is one of the most prominent factors. The optimization of task-level scheduling in cloud workflow system is a hot topic. As the scheduling is a NP problem, Ant Colony Optimization (ACO) and Particle Swarm Optimization (PSO) have been proposed to optimize the cost. However, they have the characteristic of premature convergence in optimization process and therefore cannot effectively reduce the cost. To solve these problems, Chaotic Particle Swarm Optimization (CPSO) algorithm with chaotic sequence and adaptive inertia weight factor is applied to present the task-level scheduling. Chaotic sequence with high randomness improves the diversity of solutions, and its regularity assures a good global convergence. Adaptive inertia weight factor depends on the estimate value of cost. It makes the scheduling avoid premature convergence by properly balancing between global and local exploration. The experimental simulation shows that the cost obtained by our scheduling is always lower than the other two representative counterparts. PMID:26357510
Evaluation of intradermal vaccination at the anti rabies vaccination OPD.
Mankeshwar, R; Silvanus, V; Akarte, S
2014-09-01
Rabies is a virtually 100% fatal acute viral encephalitis caused by an RNA virus belonging to family Rhabdoviridae and genus Lyssavirus. The virus can infect all warm blooded animals. The disease is transmitted to humans by the bite, lick or scratch of an infected animal. More than 99% of all human rabies deaths occur in the developing world. It is preventable with timely and proper usage of modern immunobiologicals (vaccines and immunoglobulins). Once exposure occurs, modern prophylaxis entails immediate wound care, local infiltration of rabies immune globulin and parenteral administration of modern cell culture vaccines in multiple doses. The annual medicinal (vaccines and other drugs) cost for animal bite treatment is Rs. 2 billion approximately (2004). The objective of the present study is to evaluate the performance of the Intradermal (i.d.) route visa vis the Intramuscular (i.m.) route in our clinical setting the Antirabies Vaccination (ARV) OPD, Sir J.J. Hospital, Mumbai. A total of 1460 patients were administered the Antirabies vaccine by the Intradermal route over the 1 year period as compared to 1075 patients who were administered the Antirabies vaccine by the Intramuscular route in the previous year. 1230 (84.2) of the patients who were administered the vaccine by the i.d. route completed the schedule and 230 (15.8%) partially completed the schedule. Four hundred thirty two (40%) of the patients who were administered the vaccine by the Intramuscular route completed the schedule and 643 (59.8%) partially completed the schedule. The vaccine cost for i.d. was Rs. 2,80,600. The vaccine cost for the intramuscular (i.m.) assuming 84% compliance was estimated as Rs. 15, 64, 000. Assuming 40% compliance the cost was estimated as Rs. 7, 82, 230. Thus a saving of Rs. 5, 01, 630 to Rs. 12, 83, 400 was effected. In our setting, the Intradermal regime was cost effective and increased patient adherence and enrolment. It has now been routinely adopted at the clinic.
Space Tug Docking Study. Volume 5: Cost Analysis
NASA Technical Reports Server (NTRS)
1976-01-01
The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.
Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan
NASA Technical Reports Server (NTRS)
1973-01-01
The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.
Power Management for Space Advanced Life Support
NASA Technical Reports Server (NTRS)
Jones, Harry
2001-01-01
Space power systems include the power source, storage, and management subsystems. In current crewed spacecraft, solar cells are the power source, batteries provide storage, and the crew performs any required load scheduling. For future crewed planetary surface systems using Advanced Life Support, we assume that plants will be grown to produce much of the crew's food and that nuclear power will be employed. Battery storage is much more costly than nuclear power capacity and so is not likely to be used. We investigate the scheduling of power demands by the crew or automatic control, to reduce the peak power load and the required generating capacity. The peak to average power ratio is a good measure of power use efficiency. We can easily schedule power demands to reduce the peak power from its maximum, but simple scheduling approaches may not find the lowest possible peak to average power ratio. An initial power scheduling example was simple enough for a human to solve, but a more complex example with many intermittent load demands required automatic scheduling. Excess power is a free resource and can be used even for minor benefits.
Optimized Hypervisor Scheduler for Parallel Discrete Event Simulations on Virtual Machine Platforms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoginath, Srikanth B; Perumalla, Kalyan S
2013-01-01
With the advent of virtual machine (VM)-based platforms for parallel computing, it is now possible to execute parallel discrete event simulations (PDES) over multiple virtual machines, in contrast to executing in native mode directly over hardware as is traditionally done over the past decades. While mature VM-based parallel systems now offer new, compelling benefits such as serviceability, dynamic reconfigurability and overall cost effectiveness, the runtime performance of parallel applications can be significantly affected. In particular, most VM-based platforms are optimized for general workloads, but PDES execution exhibits unique dynamics significantly different from other workloads. Here we first present results frommore » experiments that highlight the gross deterioration of the runtime performance of VM-based PDES simulations when executed using traditional VM schedulers, quantitatively showing the bad scaling properties of the scheduler as the number of VMs is increased. The mismatch is fundamental in nature in the sense that any fairness-based VM scheduler implementation would exhibit this mismatch with PDES runs. We also present a new scheduler optimized specifically for PDES applications, and describe its design and implementation. Experimental results obtained from running PDES benchmarks (PHOLD and vehicular traffic simulations) over VMs show over an order of magnitude improvement in the run time of the PDES-optimized scheduler relative to the regular VM scheduler, with over 20 reduction in run time of simulations using up to 64 VMs. The observations and results are timely in the context of emerging systems such as cloud platforms and VM-based high performance computing installations, highlighting to the community the need for PDES-specific support, and the feasibility of significantly reducing the runtime overhead for scalable PDES on VM platforms.« less
Performance and economy of a fault-tolerant multiprocessor
NASA Technical Reports Server (NTRS)
Lala, J. H.; Smith, C. J.
1979-01-01
The FTMP (Fault-Tolerant Multiprocessor) is one of two central aircraft fault-tolerant architectures now in the prototype phase under NASA sponsorship. The intended application of the computer includes such critical real-time tasks as 'fly-by-wire' active control and completely automatic Category III landings of commercial aircraft. The FTMP architecture is briefly described and it is shown that it is a viable solution to the multi-faceted problems of safety, speed, and cost. Three job dispatch strategies are described, and their results with respect to job-starting delay are presented. The first strategy is a simple First-Come-First-Serve (FCFS) job dispatch executive. The other two schedulers are an adaptive FCFS and an interrupt driven scheduler. Three failure modes are discussed, and the FTMP survival probability in the face of random hard failures is evaluated. It is noted that the hourly cost of operating two FTMPs in a transport aircraft can be as little as one-to-two percent of the total flight-hour cost of the aircraft.
Rinehart, Joseph B; Lee, Tiffany C; Kaneshiro, Kayleigh; Tran, Minh-Ha; Sun, Coral; Kain, Zeev N
2016-04-01
As part of ongoing perioperative surgical home implantation process, we applied a previously published algorithm for creation of a maximum surgical blood order schedule (MSBOS) to our operating rooms. We hypothesized that using the MSBOS we could show a reduction in unnecessary preoperative blood testing and associated costs. Data regarding all surgical cases done at UC Irvine Health's operating rooms from January 1, 2011, to January 1, 2014 were extracted from the anesthesia information management systems (AIMS). After the data were organized into surgical specialties and operative sites, blood order recommendations were generated based on five specific case characteristics of the group. Next, we assessed current ordering practices in comparison to actual blood utilization to identify potential areas of wastage and performed a cost analysis comparing the annual hospital costs from preoperative blood orders if the blood order schedule were to be followed to historical practices. Of the 19,138 patients who were categorized by the MSBOS as needing no blood sample, 2694 (14.0%) had a type and screen (T/S) ordered and 1116 (5.8%) had a type and crossmatch ordered. Of the 6073 procedures where MSBOS recommended only a T/S, 2355 (38.8%) had blood crossmatched. The cost analysis demonstrated an annual reduction in actual hospital costs of $57,335 with the MSBOS compared to historical blood ordering practices. We showed that the algorithm for development of a multispecialty blood order schedule is transferable and yielded reductions in preoperative blood product screening at our institution. © 2016 AABB.
Some single-machine scheduling problems with learning effects and two competing agents.
Li, Hongjie; Li, Zeyuan; Yin, Yunqiang
2014-01-01
This study considers a scheduling environment in which there are two agents and a set of jobs, each of which belongs to one of the two agents and its actual processing time is defined as a decreasing linear function of its starting time. Each of the two agents competes to process its respective jobs on a single machine and has its own scheduling objective to optimize. The objective is to assign the jobs so that the resulting schedule performs well with respect to the objectives of both agents. The objective functions addressed in this study include the maximum cost, the total weighted completion time, and the discounted total weighted completion time. We investigate three problems arising from different combinations of the objectives of the two agents. The computational complexity of the problems is discussed and solution algorithms where possible are presented.
The effect of dynamic scheduling and routing in a solid waste management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johansson, Ola M.
2006-07-01
Solid waste collection and hauling account for the greater part of the total cost in modern solid waste management systems. In a recent initiative, 3300 Swedish recycling containers have been fitted with level sensors and wireless communication equipment, thereby giving waste collection operators access to real-time information on the status of each container. In this study, analytical modeling and discrete-event simulation have been used to evaluate different scheduling and routing policies utilizing the real-time data. In addition to the general models developed, an empirical simulation study has been performed on the downtown recycling station system in Malmoe, Sweden. From themore » study, it can be concluded that dynamic scheduling and routing policies exist that have lower operating costs, shorter collection and hauling distances, and reduced labor hours compared to the static policy with fixed routes and pre-determined pick-up frequencies employed by many waste collection operators today. The results of the analytical model and the simulation models are coherent, and consistent with experiences of the waste collection operators.« less
2014-05-01
CDiff Antibiotics) 4.5.3 Preliminary Results of Prototype 1 Figure 5: Mapped Cases of Clostridium difficile by ward over 1 year KGH C. Diff. All...Quarters Figure 6: Mapped Cases of Clostridium difficile by ward over 3 months KGH C. Diff. Q1 Figure 7: Mapped Cases of Methicillin Resistant Staph...Competing Technologies B-2 Schedule Performance Summary B-3 Cost Performance Summary Annex C Publications, Presentations, Patents Bibliography List of
Code of Federal Regulations, 2013 CFR
2013-04-01
... URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability... is repeated; (2) Request the recipient to submit progress schedules for completing activities or... incur costs for the affected activity; (4) Recommend that the recipient redirect funds from affected...
Code of Federal Regulations, 2014 CFR
2014-04-01
... URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability... is repeated; (2) Request the recipient to submit progress schedules for completing activities or... incur costs for the affected activity; (4) Recommend that the recipient redirect funds from affected...
Code of Federal Regulations, 2013 CFR
2013-04-01
... members of the public under this subpart: (1) Fee schedule. (i) Searching for records, per hour or... employee who actually performs the search, plus an additional 16% of that rate to cover benefits. (ii) The cost for computer searches will be calculated based on the salary of the category of employee who...
Code of Federal Regulations, 2014 CFR
2014-04-01
... members of the public under this subpart: (1) Fee schedule. (i) Searching for records, per hour or... employee who actually performs the search, plus an additional 16% of that rate to cover benefits. (ii) The cost for computer searches will be calculated based on the salary of the category of employee who...
Code of Federal Regulations, 2012 CFR
2012-04-01
... members of the public under this subpart: (1) Fee schedule. (i) Searching for records, per hour or... employee who actually performs the search, plus an additional 16% of that rate to cover benefits. (ii) The cost for computer searches will be calculated based on the salary of the category of employee who...
DOT National Transportation Integrated Search
2011-08-27
"In principle, hours-of-service (HOS) regulations are intended to help truck drivers ensure get adequate rest and perform safe operations. The new HOS regulations, however, may lead to substantial cost increases for regional common carriers which hav...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
48 CFR 736.602-3 - Evaluation board functions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... industry with respect to such factors as control of costs, quality of work, and ability to meet schedules, to the extent such information is available; (4) Ability to assign an adequate number of qualified... architect-engineer is able to perform with its own forces when required; (6) Ability of the architect...
48 CFR 736.602-3 - Evaluation board functions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... industry with respect to such factors as control of costs, quality of work, and ability to meet schedules, to the extent such information is available; (4) Ability to assign an adequate number of qualified... architect-engineer is able to perform with its own forces when required; (6) Ability of the architect...
48 CFR 736.602-3 - Evaluation board functions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... industry with respect to such factors as control of costs, quality of work, and ability to meet schedules, to the extent such information is available; (4) Ability to assign an adequate number of qualified... architect-engineer is able to perform with its own forces when required; (6) Ability of the architect...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
Predicting the Effects of Longitudinal Variables on Cost and Schedule Performance
2007-03-01
budget so that as cost growth occurs, it can be absorbed (Moore, 2003:2). This number padding is very tempting since it relieves the program...presence of a value, zero was entered for the missing variables because without any value assigned, the analysis software would ignore all data for the...program in question, reducing the already small dataset. Second, if we considered the variable in isolation, we removed the zero and left the field
Routing and Scheduling Optimization Model of Sea Transportation
NASA Astrophysics Data System (ADS)
barus, Mika debora br; asyrafy, Habib; nababan, Esther; mawengkang, Herman
2018-01-01
This paper examines the routing and scheduling optimization model of sea transportation. One of the issues discussed is about the transportation of ships carrying crude oil (tankers) which is distributed to many islands. The consideration is the cost of transportation which consists of travel costs and the cost of layover at the port. Crude oil to be distributed consists of several types. This paper develops routing and scheduling model taking into consideration some objective functions and constraints. The formulation of the mathematical model analyzed is to minimize costs based on the total distance visited by the tanker and minimize the cost of the ports. In order for the model of the problem to be more realistic and the cost calculated to be more appropriate then added a parameter that states the multiplier factor of cost increases as the charge of crude oil is filled.
Marlowe, Douglas B.; Festinger, David S.; Dugosh, Karen L.; Lee, Patricia A.; Benasutti, Kathleen M.
2007-01-01
This article reports recent findings from a program of experimental research examining the effects of adapting judicial supervision to the risk level of drug-abusing offenders. Prior studies revealed that high-risk participants with (1) antisocial personality disorder or (2) a history of drug abuse treatment performed significantly better in drug court when they were scheduled to attend frequent, bi-weekly judicial status hearings in court. Low-risk participants performed equivalently regardless of the schedule of court hearings. The current study prospectively matched misdemeanor drug court clients to the optimal schedule of court hearings based upon an assessment of their risk status, and compared outcomes to those of clients randomly assigned to the standard schedule of court hearings. Results confirmed that high-risk participants graduated at a higher rate, provided more drug-negative urine specimens at 6 months post-admission, and reported significantly less drug use and alcohol intoxication at 6 months post-admission when they were matched to bi-weekly hearings as compared to the usual schedule of hearings. These findings yield practical information for enhancing the efficacy and cost-efficiency of drug court services. Directions for future research on adaptive programming for drug offenders are discussed. PMID:17071020
Silva, Bhagya Nathali; Khan, Murad; Han, Kijun
2018-01-01
The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism. PMID:29495346
Guidance and Control Software,
1980-05-01
commitments of function, cost, and schedule . The phrase "software engineering" was intended to contrast with the phrase "computer science" the latter aims...the software problems of cost, delivery schedule , and quality were gradually being recognized at the highest management levels. Thus, in a project... schedule dates. Although the analysis of software problems indicated that the entire software development process (figure 1) needed new methods, only
Pietras, Cynthia J; Brandt, Andrew E; Searcy, Gabriel D
2010-01-01
An experiment with adult humans investigated the effects of response-contingent money loss (response-cost punishment) on monetary-reinforced responding. A yoked-control procedure was used to separate the effects on responding of the response-cost contingency from the effects of reduced reinforcement density. Eight adults pressed buttons for money on a three-component multiple reinforcement schedule. During baseline, responding in all components produced money gains according to a random-interval 20-s schedule. During punishment conditions, responding during the punishment component conjointly produced money losses according to a random-interval schedule. The value of the response-cost schedule was manipulated across conditions to systematically evaluate the effects on responding of response-cost frequency. Participants were assigned to one of two yoked-control conditions. For participants in the Yoked Punishment group, during punishment conditions money losses were delivered in the yoked component response independently at the same intervals that money losses were produced in the punishment component. For participants in the Yoked Reinforcement group, responding in the yoked component produced the same net earnings as produced in the punishment component. In 6 of 8 participants, contingent response cost selectively decreased response rates in the punishment component and the magnitude of the decrease was directly related to the punishment schedule value. Under punishment conditions, for participants in the Yoked Punishment group response rates in the yoked component also decreased, but the decrease was less than that observed in the punishment component, whereas for participants in the Yoked Reinforcement group response rates in the yoked component remained similar to rates in the no-punishment component. These results provide further evidence that contingent response cost functions similarly to noxious punishers in that it appears to suppress responding apart from its effects on reinforcement density. PMID:20676265
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
Sustaining mammography screening among the medically underserved: a follow-up evaluation.
Davis, Terry C; Arnold, Connie L; Bennett, Charles L; Wolf, Michael S; Liu, Dachao; Rademaker, Alfred
2015-04-01
Our previous three-arm comparative effectiveness intervention in community clinic patients who were not up-to-date with screening resulted in mammography rates over 50% in all arms. Our aim was to evaluate the effectiveness and cost-effectiveness of the three interventions on improving biennial screening rates among eligible patients. A three-arm quasi-experimental evaluation was conducted in eight community clinics from 2008 to 2011. Screening efforts included (1) enhanced care: Participants received an in-person recommendation from a research assistant (RA) in year 1, and clinics followed usual clinic protocol for scheduling screening mammograms; (2) education intervention: Participants received education and in-person recommendation from an RA in year 1, and clinics followed usual clinic protocol for scheduling mammograms; or (3) nurse support: A nurse manager provided in-person education and recommendation, scheduled mammograms, and followed up with phone support. In all arms, mammography was offered at no cost to uninsured patients. Of 624 eligible women, biennial mammography within 24-30 months of their previous test was performed for 11.0% of women in the enhanced-care arm, 7.1% in the education- intervention arm, and 48.0% in the nurse-support arm (p<0.0001). The incremental cost was $1,232 per additional woman undergoing screening with nurse support vs. enhanced care and $1,092 with nurse support vs. education. Biennial mammography screening rates were improved by providing nurse support but not with enhanced care or education. However, this approach was not cost-effective.
PLAStiCC: Predictive Look-Ahead Scheduling for Continuous dataflows on Clouds
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kumbhare, Alok; Simmhan, Yogesh; Prasanna, Viktor K.
2014-05-27
Scalable stream processing and continuous dataflow systems are gaining traction with the rise of big data due to the need for processing high velocity data in near real time. Unlike batch processing systems such as MapReduce and workflows, static scheduling strategies fall short for continuous dataflows due to the variations in the input data rates and the need for sustained throughput. The elastic resource provisioning of cloud infrastructure is valuable to meet the changing resource needs of such continuous applications. However, multi-tenant cloud resources introduce yet another dimension of performance variability that impacts the application’s throughput. In this paper wemore » propose PLAStiCC, an adaptive scheduling algorithm that balances resource cost and application throughput using a prediction-based look-ahead approach. It not only addresses variations in the input data rates but also the underlying cloud infrastructure. In addition, we also propose several simpler static scheduling heuristics that operate in the absence of accurate performance prediction model. These static and adaptive heuristics are evaluated through extensive simulations using performance traces obtained from public and private IaaS clouds. Our results show an improvement of up to 20% in the overall profit as compared to the reactive adaptation algorithm.« less
A cost comparison analysis of adjuvant radiation therapy techniques after breast-conserving surgery.
Lanni, Thomas; Keisch, Martin; Shah, Chirag; Wobb, Jessica; Kestin, Larry; Vicini, Frank
2013-01-01
The aim of this study is to perform a cost analysis to compare adjuvant radiation therapy schedules following breast conserving surgery. Treatment planning and delivery utilization data were modeled for a series of 10 different breast RT techniques. The whole breast (WB) regimens consisted of: (1) Wedge based WB (25 fractions [fx]), (2) WB using IMRT, (3) WBRT with a boost (B), (4) WBRT using IMRT with a B, (5) Canadian WB (16 fx) with 3D-CRT, and (6) Canadian using IMRT. The accelerated partial breast irradiation (APBI) regimens included (7): APBI using 3D-CRT, (8) IMRT, (9) single channel balloon, and (10) multi-channel balloon. Costs incurred by the payer (i.e., direct medical costs) were taken from the 2011 Medicare Fee Schedule. Among all the different regimens examined, Canadian 3D-CRT and APBI 3D-CRT were the least costly whereas WB using IMRT with a B was the most expensive. Both APBI brachytherapy techniques were less costly than conventional WB with a B. In terms of direct medical costs, the technical component accounted for most, if not all, of the disparity among the various treatments. A general trend of decreasing RT costs was observed with further reductions in overall treatment time for WBRT techniques, but not all of the alternative treatment regimens led to similar total cost savings. APBI using brachytherapy techniques was less costly than conventional WBRT with a standard boost. © 2013 Wiley Periodicals, Inc.
PHENIX Work Breakdown Structure. Cost and schedule review copy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
Analysis of Application Power and Schedule Composition in a High Performance Computing Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elmore, Ryan; Gruchalla, Kenny; Phillips, Caleb
As the capacity of high performance computing (HPC) systems continues to grow, small changes in energy management have the potential to produce significant energy savings. In this paper, we employ an extensive informatics system for aggregating and analyzing real-time performance and power use data to evaluate energy footprints of jobs running in an HPC data center. We look at the effects of algorithmic choices for a given job on the resulting energy footprints, and analyze application-specific power consumption, and summarize average power use in the aggregate. All of these views reveal meaningful power variance between classes of applications as wellmore » as chosen methods for a given job. Using these data, we discuss energy-aware cost-saving strategies based on reordering the HPC job schedule. Using historical job and power data, we present a hypothetical job schedule reordering that: (1) reduces the facility's peak power draw and (2) manages power in conjunction with a large-scale photovoltaic array. Lastly, we leverage this data to understand the practical limits on predicting key power use metrics at the time of submission.« less
Fog computing job scheduling optimization based on bees swarm
NASA Astrophysics Data System (ADS)
Bitam, Salim; Zeadally, Sherali; Mellouk, Abdelhamid
2018-04-01
Fog computing is a new computing architecture, composed of a set of near-user edge devices called fog nodes, which collaborate together in order to perform computational services such as running applications, storing an important amount of data, and transmitting messages. Fog computing extends cloud computing by deploying digital resources at the premise of mobile users. In this new paradigm, management and operating functions, such as job scheduling aim at providing high-performance, cost-effective services requested by mobile users and executed by fog nodes. We propose a new bio-inspired optimization approach called Bees Life Algorithm (BLA) aimed at addressing the job scheduling problem in the fog computing environment. Our proposed approach is based on the optimized distribution of a set of tasks among all the fog computing nodes. The objective is to find an optimal tradeoff between CPU execution time and allocated memory required by fog computing services established by mobile users. Our empirical performance evaluation results demonstrate that the proposal outperforms the traditional particle swarm optimization and genetic algorithm in terms of CPU execution time and allocated memory.
Self-balancing dynamic scheduling of electrical energy for energy-intensive enterprises
NASA Astrophysics Data System (ADS)
Gao, Yunlong; Gao, Feng; Zhai, Qiaozhu; Guan, Xiaohong
2013-06-01
Balancing production and consumption with self-generation capacity in energy-intensive enterprises has huge economic and environmental benefits. However, balancing production and consumption with self-generation capacity is a challenging task since the energy production and consumption must be balanced in real time with the criteria specified by power grid. In this article, a mathematical model for minimising the production cost with exactly realisable energy delivery schedule is formulated. And a dynamic programming (DP)-based self-balancing dynamic scheduling algorithm is developed to obtain the complete solution set for such a multiple optimal solutions problem. For each stage, a set of conditions are established to determine whether a feasible control trajectory exists. The state space under these conditions is partitioned into subsets and each subset is viewed as an aggregate state, the cost-to-go function is then expressed as a function of initial and terminal generation levels of each stage and is proved to be a staircase function with finite steps. This avoids the calculation of the cost-to-go of every state to resolve the issue of dimensionality in DP algorithm. In the backward sweep process of the algorithm, an optimal policy is determined to maximise the realisability of energy delivery schedule across the entire time horizon. And then in the forward sweep process, the feasible region of the optimal policy with the initial and terminal state at each stage is identified. Different feasible control trajectories can be identified based on the region; therefore, optimising for the feasible control trajectory is performed based on the region with economic and reliability objectives taken into account.
1L Mark-IV Target Design Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koehler, Paul E.
This presentation includes General Design Considerations; Current (Mark-III) Lower Tier; Mark-III Upper Tier; Performance Metrics; General Improvements for Material Science; General Improvements for Nuclear Science; Improving FOM for Nuclear Science; General Design Considerations Summary; Design Optimization Studies; Expected Mark-IV Performance: Material Science; Expected Mark-IV Performance: Nuclear Science (Disk); Mark IV Enables Much Wider Range of Nuclear-Science FOM Gains than Mark III; Mark-IV Performance Summary; Rod or Disk? Center or Real FOV?; and Project Cost and Schedule.
TRU Waste Management Program cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
1985-10-01
The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less
Hwang, I-Shyan
2017-01-01
The K-coverage configuration that guarantees coverage of each location by at least K sensors is highly popular and is extensively used to monitor diversified applications in wireless sensor networks. Long network lifetime and high detection quality are the essentials of such K-covered sleep-scheduling algorithms. However, the existing sleep-scheduling algorithms either cause high cost or cannot preserve the detection quality effectively. In this paper, the Pre-Scheduling-based K-coverage Group Scheduling (PSKGS) and Self-Organized K-coverage Scheduling (SKS) algorithms are proposed to settle the problems in the existing sleep-scheduling algorithms. Simulation results show that our pre-scheduled-based KGS approach enhances the detection quality and network lifetime, whereas the self-organized-based SKS algorithm minimizes the computation and communication cost of the nodes and thereby is energy efficient. Besides, SKS outperforms PSKGS in terms of network lifetime and detection quality as it is self-organized. PMID:29257078
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
Effects of partitioning and scheduling sparse matrix factorization on communication and load balance
NASA Technical Reports Server (NTRS)
Venugopal, Sesh; Naik, Vijay K.
1991-01-01
A block based, automatic partitioning and scheduling methodology is presented for sparse matrix factorization on distributed memory systems. Using experimental results, this technique is analyzed for communication and load imbalance overhead. To study the performance effects, these overheads were compared with those obtained from a straightforward 'wrap mapped' column assignment scheme. All experimental results were obtained using test sparse matrices from the Harwell-Boeing data set. The results show that there is a communication and load balance tradeoff. The block based method results in lower communication cost whereas the wrap mapped scheme gives better load balance.
Automated mixed traffic vehicle control and scheduling study
NASA Technical Reports Server (NTRS)
Peng, T. K. C.; Chon, K.
1976-01-01
The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.
JCL Implementation On A Human Spaceflight Program
NASA Technical Reports Server (NTRS)
Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William
2013-01-01
Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
Automated problem scheduling and reduction of synchronization delay effects
NASA Technical Reports Server (NTRS)
Saltz, Joel H.
1987-01-01
It is anticipated that in order to make effective use of many future high performance architectures, programs will have to exhibit at least a medium grained parallelism. A framework is presented for partitioning very sparse triangular systems of linear equations that is designed to produce favorable preformance results in a wide variety of parallel architectures. Efficient methods for solving these systems are of interest because: (1) they provide a useful model problem for use in exploring heuristics for the aggregation, mapping and scheduling of relatively fine grained computations whose data dependencies are specified by directed acrylic graphs, and (2) because such efficient methods can find direct application in the development of parallel algorithms for scientific computation. Simple expressions are derived that describe how to schedule computational work with varying degrees of granularity. The Encore Multimax was used as a hardware simulator to investigate the performance effects of using the partitioning techniques presented in shared memory architectures with varying relative synchronization costs.
Teimouri, Fatemeh; Kebriaeezadeh, Abbas; Zahraei, Seyed Mohsen; Gheiratian, MohammadMahdi; Nikfar, Shekoufeh
2017-01-14
Health decision makers need to know the impact of the development of a new intervention on the public health and health care costs so that they can plan for economic and financial objectives. The aim of this study was to determine the budget impact of adding Haemophilus influenzae type b (Hib) as a part of a Pentavalent vaccine (Hib-HBV-DTP) to the national childhood immunization schedule of Iran. An excel-based model was developed to determine the costs of including the Pentavalent vaccine in the national immunization program (NIP), comparing the present schedule with the previous one (including separate DTP and hepatitis B vaccines). The total annual costs included the cost of vaccination (the vaccine and syringe) and the cost of Hib treatment. The health outcome was the estimated annual cases of the diseases. The net budget impact was the difference in the total annual cost between the two schedules. Uncertainty about the vaccine effectiveness, vaccination coverage, cost of the vaccine, and cost of the diseases were handled through scenario analysis. The total cost of vaccination during 5 years was $18,060,463 in the previous program and $67,774,786 in the present program. Inclusion of the Pentavalent vaccine would increase the vaccination cost about $49 million, but would save approximately $6 million in the healthcare costs due to reduction of disease cases and treatment costs. The introduction of the Pentavalent vaccine resulted in a net increase in the healthcare budget expenditure across all scenarios from $43.4 million to $50.7 million. The results of this study showed that the inclusion of the Pentavalent vaccine in the NIP of Iran had a significant impact on the health care budget and increased the financial burden on the government. Budget impact of including Pentavalent vaccine in the national immunization schedule of Iranᅟ.
National Airspace System : status of FAA's Standard Terminal Automation Replacement System
DOT National Transportation Integrated Search
2002-09-01
Comparing the currently projected cost and deployment schedule for : STARS with the original cost and schedule is difficult because the program : presently bears little resemblance to the program envisioned in 1996. At : that time, FAA contracted wit...
NASA Astrophysics Data System (ADS)
1982-12-01
The behavior and suitability of aquifers as compressed-air energy-storage sites is discussed. The engineering and construction schedule, facilities capital-cost estimate, and corresponding cash-flow requirements are given.
2016-04-01
3Concurrency is broadly defined as the overlap between technology development and product development or between product development and...reported extensively on the F-35 program’s cost, schedule, and performance problems. The program plans to begin increasing production rates over the...internal DOD program analyses. GAO also collected and analyzed production and supply chain performance data, and interviewed DOD, program, and
AGT 1500 Powerpack Improvement Project (M1 TMEPS). Volume 1
1991-03-01
culminated in a one week evalUation of the ATR. This was due to funding and schedule constraints. Testing was concentrated on vehicle mobility performance...June 1990 with a one week vehicle demonstration at Milford Proving Grounds. The vehicle performed well but the mobility characteristics, most...all of the nonrecurring, recurring, engineering, data, system test and evaluation, and initial spares costs aplicable to each alternative. TMEPS as a
Multi-time Scale Joint Scheduling Method Considering the Grid of Renewable Energy
NASA Astrophysics Data System (ADS)
Zhijun, E.; Wang, Weichen; Cao, Jin; Wang, Xin; Kong, Xiangyu; Quan, Shuping
2018-01-01
Renewable new energy power generation prediction error like wind and light, brings difficulties to dispatch the power system. In this paper, a multi-time scale robust scheduling method is set to solve this problem. It reduces the impact of clean energy prediction bias to the power grid by using multi-time scale (day-ahead, intraday, real time) and coordinating the dispatching power output of various power supplies such as hydropower, thermal power, wind power, gas power and. The method adopts the robust scheduling method to ensure the robustness of the scheduling scheme. By calculating the cost of the abandon wind and the load, it transforms the robustness into the risk cost and optimizes the optimal uncertainty set for the smallest integrative costs. The validity of the method is verified by simulation.
NASA Technical Reports Server (NTRS)
Withey, James V.
1986-01-01
The validity of real-time software is determined by its ability to execute on a computer within the time constraints of the physical system it is modeling. In many applications the time constraints are so critical that the details of process scheduling are elevated to the requirements analysis phase of the software development cycle. It is not uncommon to find specifications for a real-time cyclic executive program included to assumed in such requirements. It was found that prelininary designs structured around this implementation abscure the data flow of the real world system that is modeled and that it is consequently difficult and costly to maintain, update and reuse the resulting software. A cyclic executive is a software component that schedules and implicitly synchronizes the real-time software through periodic and repetitive subroutine calls. Therefore a design method is sought that allows the deferral of process scheduling to the later stages of design. The appropriate scheduling paradigm must be chosen given the performance constraints, the largest environment and the software's lifecycle. The concept of process inversion is explored with respect to the cyclic executive.
The Feasibility of Determining Success Criteria for Educational Research and Development Projects.
ERIC Educational Resources Information Center
Ball, Rodney J.; Cook, Desmond L.
The determination of final success of educational research and development projects is an important problem for those concerned with project management and evaluation. The purpose of this study was twofold: (a) to determine if schedule, cost, quality/performance, follow-on work, spin-off benefits, and customer/client satisfaction were given a…
D-21B RBCC Modification Feasibility Study
NASA Technical Reports Server (NTRS)
1999-01-01
This report presents a feasibility study on the modifications required to re-engine the Lockheed D-21 Drone for use as a NASA RBCC engine. An introduction, background information, engine configuration and performance, propulsion system integration, loads/thermal analysis, avionics/systems, flight test results, costs and work schedule, and some conclusions are presented.
Fontecha, John E; Akhavan-Tabatabaei, Raha; Duque, Daniel; Medaglia, Andrés L; Torres, María N; Rodríguez, Juan Pablo
In this work we tackle the problem of planning and scheduling preventive maintenance (PM) of sediment-related sewer blockages in a set of geographically distributed sites that are subject to non-deterministic failures. To solve the problem, we extend a combined maintenance and routing (CMR) optimization approach which is a procedure based on two components: (a) first a maintenance model is used to determine the optimal time to perform PM operations for each site and second (b) a mixed integer program-based split procedure is proposed to route a set of crews (e.g., sewer cleaners, vehicles equipped with winches or rods and dump trucks) in order to perform PM operations at a near-optimal minimum expected cost. We applied the proposed CMR optimization approach to two (out of five) operative zones in the city of Bogotá (Colombia), where more than 100 maintenance operations per zone must be scheduled on a weekly basis. Comparing the CMR against the current maintenance plan, we obtained more than 50% of cost savings in 90% of the sites.
The role of a nurse telephone call to prevent no-shows in endoscopy.
Childers, Ryan E; Laird, Amy; Newman, Lisa; Keyashian, Kian
2016-12-01
Preventing missed appointments, or "no-shows," is an important target in improving efficient patient care and lowering costs in gastrointestinal endoscopy practices. We aimed to investigate whether a nurse telephone call would reduce no-show rates for endoscopic appointments, and to determine if hiring and maintaining a nurse dedicated to pre-endoscopy phone calls is economically advantageous. Our secondary aim was to identify predictors of no-shows to endoscopy appointments. We hired and trained a full-time licensed nurse to make a telephone call to patients 7 days before their scheduled upper endoscopy or colonoscopy. We compared this intervention with a previous reminder system involving mailed reminders. The effect of the intervention and impact of other predictors of no-shows were analyzed in 2 similar preintervention and postintervention patient cohorts. A mixed effects logistic regression model was used to estimate the association of the odds of being a no-show to the scheduled appointment and the characteristics of the patient and visit. An analysis of costs was performed that included the startup and maintenance costs of the intervention. We found that a nurse phone call was associated with a 33% reduction in the odds of a no-show visit (odds ratio, 0.67; 95% confidence interval, 0.50-0.91), adjusting for gender, age, partnered status, insurer type, distance from the endoscopy center, and visit type. The recovered reimbursement during the study period was $48,765, with net savings of $16,190 when accounting for the maintenance costs of the intervention; this resulted in a net revenue per annum of $43,173. We found that endoscopy practices may increase revenue, improve scheduling efficiency, and maximize resource utilization by hiring a nurse to reduce no-shows. Predictors of no-shows to endoscopy included unpartnered or single patients, commercial or managed care, being scheduled for colonoscopy as opposed to upper endoscopy, and being scheduled for a screening or surveillance colonoscopy. Copyright © 2016 American Society for Gastrointestinal Endoscopy. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Bishop, D. F.
1972-01-01
The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.
NASA Astrophysics Data System (ADS)
Tang, Dunbing; Dai, Min
2015-09-01
The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production planning and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed smalland large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.
The Delta Launch Vehicle Model 2914 Series
NASA Technical Reports Server (NTRS)
Gunn, C. R.
1973-01-01
The newest Delta launch vehicle configuration, Model 2914 is described for potential users together with recent flight results. A functional description of the vehicle, its performance, flight profile, flight environment, injection accuracy, spacecraft integration requirements, user organizational interfaces, launch operations, costs and reimbursable users payment plan are provided. The versatile, relatively low cost Delta has a flight demonstrated reliability record of 92 percent that has been established in 96 launches over twelve years while concurrently undergoing ten major upratings to keep pace with the ever increasing performance and reliability requirements of its users. At least 40 more launches are scheduled over the next three years from the Eastern and Western Test Ranges.
Germar, Maria Julieta; Purugganan, Carrie; Bernardino, Ma Socorro; Cuenca, Benjamin; Chen, Y-Chen; Li, Xiao; Van Kriekinge, Georges; Lee, I-Heng
2017-05-04
Cervical cancer (CC) is the second leading cause of cancer death among Filipino women. Human papillomavirus (HPV) vaccination protects against CC. Two vaccines (AS04-HPV-16/18 and 4vHPV) are approved in the Philippines; they were originally developed for a 3-dose (3D) administration and have recently been approved in a 2-dose schedule (2D). This study aims to evaluate the cost-effectiveness of HPV vaccination of 13-year-old Filipino girls, in addition to current screening, in the new 2D schedule. An existing static lifetime, one-year cycle Markov cohort model was adapted to the Philippine settings to simulate the natural history of low-risk and oncogenic HPV infection, the effects of screening and vaccination of a 13-year-old girls cohort vaccinated with either the 2D-AS04-HPV-16/18 or 2D-4vHPV assuming a 100% vaccination coverage. Incremental cost, quality-adjusted life year (QALY) and cost-effectiveness were derived from these estimates. Input data were obtained from published sources and Delphi panel, using country-specific data where possible. Sensitivity analyses were performed to assess the robustness of the model. The model estimated that 2D-AS04-HPV-16/18 prevented 986 additional CC cases and 399 CC deaths (undiscounted), as well as 555 increased QALY (discounted), and save 228.1 million Philippine pesos (PHP) compared with the 2D-4vHPV. In conclusion, AS04-HPV-16/18 is shown to be dominant over 4vHPV in the Philippines, with greater estimated health benefits and lower costs.
Germar, Maria Julieta; Purugganan, Carrie; Bernardino, Ma. Socorro; Cuenca, Benjamin; Chen, Y-Chen; Li, Xiao; Van Kriekinge, Georges; Lee, I-Heng
2017-01-01
ABSTRACT Cervical cancer (CC) is the second leading cause of cancer death among Filipino women. Human papillomavirus (HPV) vaccination protects against CC. Two vaccines (AS04-HPV-16/18 and 4vHPV) are approved in the Philippines; they were originally developed for a 3-dose (3D) administration and have recently been approved in a 2-dose schedule (2D). This study aims to evaluate the cost-effectiveness of HPV vaccination of 13-year-old Filipino girls, in addition to current screening, in the new 2D schedule. An existing static lifetime, one-year cycle Markov cohort model was adapted to the Philippine settings to simulate the natural history of low-risk and oncogenic HPV infection, the effects of screening and vaccination of a 13-year-old girls cohort vaccinated with either the 2D-AS04-HPV-16/18 or 2D-4vHPV assuming a 100% vaccination coverage. Incremental cost, quality-adjusted life year (QALY) and cost-effectiveness were derived from these estimates. Input data were obtained from published sources and Delphi panel, using country-specific data where possible. Sensitivity analyses were performed to assess the robustness of the model. The model estimated that 2D-AS04-HPV-16/18 prevented 986 additional CC cases and 399 CC deaths (undiscounted), as well as 555 increased QALY (discounted), and save 228.1 million Philippine pesos (PHP) compared with the 2D-4vHPV. In conclusion, AS04-HPV-16/18 is shown to be dominant over 4vHPV in the Philippines, with greater estimated health benefits and lower costs. PMID:28075249
Mousavi, Maryam; Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah
2017-01-01
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs' battery charge. Assessment of the numerical examples' scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software.
Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah
2017-01-01
Flexible manufacturing system (FMS) enhances the firm’s flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs’ battery charge. Assessment of the numerical examples’ scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software. PMID:28263994
NASA Technical Reports Server (NTRS)
1981-01-01
The results of magnet system special investigations listed below are summarized: 4 Tesla Magnet Alternate Design Study; 6 Tesla Magnet Manufacturability Study. The conceptual design for a 4 Tesla superconducting magnet system for use with an alternate (supersonic) ETF power train is described, and estimated schedule and cost are identified. The magnet design is scaled from the ETF 6 T Tesla design. Results of a manufacturability study and a revised schedule and cost estimate for the ETF 6 T magnet are reported. Both investigations are extensions of the conceptual design of a 6 T magnet system performed earlier as a part of the overall MED-ETF conceptual design described in Conceptual Design Engineering Report (CDER) Vol. V, System Design Description (SDD) 503 dated September, 1981, DOE/NASA/0224-1; NASA CR-165/52.
Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models
NASA Technical Reports Server (NTRS)
Gagnier, Donald; Hayner, Rick; Nosek, Thomas; Roza, Michael; Hendershot, James E.; Razzaghi, Andrea I.
2004-01-01
This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric scientific instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments and the Aura spacecraft bus electronics. Aura is one of NASA s Earth Observatory System missions. The test was designed to evaluate the complex interfaces in the command and data handling subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during the flight integration phase of the observatory can cause significant cost and schedule impacts. The tests successfully revealed problems and led to their resolution before the full-up integration phase, saving significant cost and schedule. This approach could be beneficial for future environmental satellite programs involving the integration of multiple, complex scientific instruments onto a spacecraft bus.
NASA Astrophysics Data System (ADS)
Choi, Young-In; Ahn, Jaemyung
2018-04-01
Earned value management (EVM) is a methodology for monitoring and controlling the performance of a project based on a comparison between planned and actual cost/schedule. This study proposes a concept of hybrid earned value management (H-EVM) that integrates the traditional EVM metrics with information on the technology readiness level. The proposed concept can reflect the progress of a project in a sensitive way and provides short-term perspective complementary to the traditional EVM metrics. A two-dimensional visualization on the cost/schedule status of a project reflecting both of the traditional EVM (long-term perspective) and the proposed H-EVM (short-term perspective) indices is introduced. A case study on the management of a new space launch vehicle development program is conducted to demonstrate the effectiveness of the proposed H-EVM concept, associated metrics, and the visualization technique.
An applied study using systems engineering methods to prioritize green systems options
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Sonya M; Macdonald, John M
2009-01-01
For many years, there have been questions about the effectiveness of applying different green solutions. If you're building a home and wish to use green technologies, where do you start? While all technologies sound promising, which will perform the best over time? All this has to be considered within the cost and schedule of the project. The amount of information available on the topic can be overwhelming. We seek to examine if Systems Engineering methods can be used to help people choose and prioritize technologies that fit within their project and budget. Several methods are used to gain perspective intomore » how to select the green technologies, such as the Analytic Hierarchy Process (AHP) and Kepner-Tregoe. In our study, subjects applied these methods to analyze cost, schedule, and trade-offs. Results will document whether the experimental approach is applicable to defining system priorities for green technologies.« less
A Method for Scheduling Air Traffic with Uncertain En Route Capacity Constraints
NASA Technical Reports Server (NTRS)
Arneson, Heather; Bloem, Michael
2009-01-01
A method for scheduling ground delay and airborne holding for flights scheduled to fly through airspace with uncertain capacity constraints is presented. The method iteratively solves linear programs for departure rates and airborne holding as new probabilistic information about future airspace constraints becomes available. The objective function is the expected value of the weighted sum of ground and airborne delay. In order to limit operationally costly changes to departure rates, they are updated only when such an update would lead to a significant cost reduction. Simulation results show a 13% cost reduction over a rough approximation of current practices. Comparison between the proposed as needed replanning method and a similar method that uses fixed frequency replanning shows a typical cost reduction of 1% to 2%, and even up to a 20% cost reduction in some cases.
A New Distributed Optimization for Community Microgrids Scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Starke, Michael R; Tomsovic, Kevin
This paper proposes a distributed optimization model for community microgrids considering the building thermal dynamics and customer comfort preference. The microgrid central controller (MCC) minimizes the total cost of operating the community microgrid, including fuel cost, purchasing cost, battery degradation cost and voluntary load shedding cost based on the customers' consumption, while the building energy management systems (BEMS) minimize their electricity bills as well as the cost associated with customer discomfort due to room temperature deviation from the set point. The BEMSs and the MCC exchange information on energy consumption and prices. When the optimization converges, the distributed generation scheduling,more » energy storage charging/discharging and customers' consumption as well as the energy prices are determined. In particular, we integrate the detailed thermal dynamic characteristics of buildings into the proposed model. The heating, ventilation and air-conditioning (HVAC) systems can be scheduled intelligently to reduce the electricity cost while maintaining the indoor temperature in the comfort range set by customers. Numerical simulation results show the effectiveness of proposed model.« less
NASA Astrophysics Data System (ADS)
1981-09-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
NASA Technical Reports Server (NTRS)
1981-01-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
Incentive-compatible demand-side management for smart grids based on review strategies
NASA Astrophysics Data System (ADS)
Xu, Jie; van der Schaar, Mihaela
2015-12-01
Demand-side load management is able to significantly improve the energy efficiency of smart grids. Since the electricity production cost depends on the aggregate energy usage of multiple consumers, an important incentive problem emerges: self-interested consumers want to increase their own utilities by consuming more than the socially optimal amount of energy during peak hours since the increased cost is shared among the entire set of consumers. To incentivize self-interested consumers to take the socially optimal scheduling actions, we design a new class of protocols based on review strategies. These strategies work as follows: first, a review stage takes place in which a statistical test is performed based on the daily prices of the previous billing cycle to determine whether or not the other consumers schedule their electricity loads in a socially optimal way. If the test fails, the consumers trigger a punishment phase in which, for a certain time, they adjust their energy scheduling in such a way that everybody in the consumer set is punished due to an increased price. Using a carefully designed protocol based on such review strategies, consumers then have incentives to take the socially optimal load scheduling to avoid entering this punishment phase. We rigorously characterize the impact of deploying protocols based on review strategies on the system's as well as the users' performance and determine the optimal design (optimal billing cycle, punishment length, etc.) for various smart grid deployment scenarios. Even though this paper considers a simplified smart grid model, our analysis provides important and useful insights for designing incentive-compatible demand-side management schemes based on aggregate energy usage information in a variety of practical scenarios.
Cost and Schedule Benchmarks for Defense Acquisition Contracts
1994-09-01
and schedule deviations early Knepp & S -curves for cost S -curves couldn’t Stroble/1993 control be used Terry & EAC Indices SCI-based EAC is...completed and on-going contracts from the early 1970’ s to date. Some of the fields in the database used in determining the status of cost overruns and...Measurement Data (Christensen, 1992:20). Christensen Article David S . Christensen published an analysis of cost overruns on DoD acquisition contracts
1988-09-30
DISTRiUTIONWtAVAu.ASiUTY OF REPORT 2b. DECLASSIFICATON I DOW’NGRADING SCHEDULE 4. PERFORMING ORGANIZATION REPORT NUMBER(S) S. MONITORING ORGANIZATION...REPORT NUMBER(S) 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION WCW Associates, Inc. Battel le 6c. ADDRESS...Cycle Figure 8-6 Induced Change k Figure 8-7 The Culture- Performance Relationship Figure 8-8 Culture-Productivity Bridge vi Preface Our cultural
Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reboul, S. H.; DiPrete, D. P.
2016-12-12
This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dosemore » associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.« less
Xiang, Wei; Li, Chong
2015-01-01
Operating Room (OR) is the core sector in hospital expenditure, the operation management of which involves a complete three-stage surgery flow, multiple resources, prioritization of the various surgeries, and several real-life OR constraints. As such reasonable surgery scheduling is crucial to OR management. To optimize OR management and reduce operation cost, a short-term surgery scheduling problem is proposed and defined based on the survey of the OR operation in a typical hospital in China. The comprehensive operation cost is clearly defined considering both under-utilization and overutilization. A nested Ant Colony Optimization (nested-ACO) incorporated with several real-life OR constraints is proposed to solve such a combinatorial optimization problem. The 10-day manual surgery schedules from a hospital in China are compared with the optimized schedules solved by the nested-ACO. Comparison results show the advantage using the nested-ACO in several measurements: OR-related time, nurse-related time, variation in resources' working time, and the end time. The nested-ACO considering real-life operation constraints such as the difference between first and following case, surgeries priority, and fixed nurses in pre/post-operative stage is proposed to solve the surgery scheduling optimization problem. The results clearly show the benefit of using the nested-ACO in enhancing the OR management efficiency and minimizing the comprehensive overall operation cost.
Gallego-Delgado, María; Villacorta, Eduardo; Valenzuela-Vicente, M Carmen; Walias-Sánchez, Ángela; Ávila, Carmen; Velasco-Cañedo, M Jesús; Cano-Mozo, M Teresa; Martín-García, Agustín; García-Sánchez, María Jesús; Sánchez, Argelina; Cascón, Manuel; Sánchez, Pedro L
2018-05-21
The cardiology day hospital (CDH) is an alternative to hospitalization for scheduled cardiological procedures. The aims of this study were to analyze the activity, quality of care and the cost-effectiveness of a CDH. An observational descriptive study was conducted of the health care activity during the first year of operation of DHHA. The quality of care was analyzed through the substitution rate (outpatient procedures), cancellation rates, complications, and a satisfaction survey. For cost-effectiveness, we calculated the economic savings of avoided hospital stays. A total of 1646 patients were attended (mean age 69 ± 15 years, 60% men); 2550 procedures were scheduled with a cancellation rate of 4%. The most frequently cancelled procedure was electrical cardioversion. The substitution rate for scheduled invasive procedures was 66%. Only 1 patient required readmission after discharge from the CDH due to heart failure. Most surveyed patients (95%) considered the care received in the CDH to be good or very good. The saving due to outpatient-converted procedures made possible by the CDH was € 219 199.55, higher than the cost of the first year of operation. In our center, the CDH allowed more than two thirds of the invasive procedures to be performed on an outpatient basis, while maintaining the quality of care. In the first year of operation, the expenses due to its implementation were offset by a significant reduction in hospital admissions. Copyright © 2018 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.
Sustaining Mammography Screening Among the Medically Underserved: A Follow-Up Evaluation
Arnold, Connie L.; Bennett, Charles L.; Wolf, Michael S.; Liu, Dachao; Rademaker, Alfred
2015-01-01
Abstract Background: Our previous three-arm comparative effectiveness intervention in community clinic patients who were not up-to-date with screening resulted in mammography rates over 50% in all arms. Objective: Our aim was to evaluate the effectiveness and cost-effectiveness of the three interventions on improving biennial screening rates among eligible patients. Methods: A three-arm quasi-experimental evaluation was conducted in eight community clinics from 2008 to 2011. Screening efforts included (1) enhanced care: Participants received an in-person recommendation from a research assistant (RA) in year 1, and clinics followed usual clinic protocol for scheduling screening mammograms; (2) education intervention: Participants received education and in-person recommendation from an RA in year 1, and clinics followed usual clinic protocol for scheduling mammograms; or (3) nurse support: A nurse manager provided in-person education and recommendation, scheduled mammograms, and followed up with phone support. In all arms, mammography was offered at no cost to uninsured patients. Results: Of 624 eligible women, biennial mammography within 24–30 months of their previous test was performed for 11.0% of women in the enhanced-care arm, 7.1% in the education- intervention arm, and 48.0% in the nurse-support arm (p<0.0001). The incremental cost was $1,232 per additional woman undergoing screening with nurse support vs. enhanced care and $1,092 with nurse support vs. education. Conclusions: Biennial mammography screening rates were improved by providing nurse support but not with enhanced care or education. However, this approach was not cost-effective. PMID:25692910
Efficient Execution of Microscopy Image Analysis on CPU, GPU, and MIC Equipped Cluster Systems.
Andrade, G; Ferreira, R; Teodoro, George; Rocha, Leonardo; Saltz, Joel H; Kurc, Tahsin
2014-10-01
High performance computing is experiencing a major paradigm shift with the introduction of accelerators, such as graphics processing units (GPUs) and Intel Xeon Phi (MIC). These processors have made available a tremendous computing power at low cost, and are transforming machines into hybrid systems equipped with CPUs and accelerators. Although these systems can deliver a very high peak performance, making full use of its resources in real-world applications is a complex problem. Most current applications deployed to these machines are still being executed in a single processor, leaving other devices underutilized. In this paper we explore a scenario in which applications are composed of hierarchical data flow tasks which are allocated to nodes of a distributed memory machine in coarse-grain, but each of them may be composed of several finer-grain tasks which can be allocated to different devices within the node. We propose and implement novel performance aware scheduling techniques that can be used to allocate tasks to devices. We evaluate our techniques using a pathology image analysis application used to investigate brain cancer morphology, and our experimental evaluation shows that the proposed scheduling strategies significantly outperforms other efficient scheduling techniques, such as Heterogeneous Earliest Finish Time - HEFT, in cooperative executions using CPUs, GPUs, and MICs. We also experimentally show that our strategies are less sensitive to inaccuracy in the scheduling input data and that the performance gains are maintained as the application scales.
Efficient Execution of Microscopy Image Analysis on CPU, GPU, and MIC Equipped Cluster Systems
Andrade, G.; Ferreira, R.; Teodoro, George; Rocha, Leonardo; Saltz, Joel H.; Kurc, Tahsin
2015-01-01
High performance computing is experiencing a major paradigm shift with the introduction of accelerators, such as graphics processing units (GPUs) and Intel Xeon Phi (MIC). These processors have made available a tremendous computing power at low cost, and are transforming machines into hybrid systems equipped with CPUs and accelerators. Although these systems can deliver a very high peak performance, making full use of its resources in real-world applications is a complex problem. Most current applications deployed to these machines are still being executed in a single processor, leaving other devices underutilized. In this paper we explore a scenario in which applications are composed of hierarchical data flow tasks which are allocated to nodes of a distributed memory machine in coarse-grain, but each of them may be composed of several finer-grain tasks which can be allocated to different devices within the node. We propose and implement novel performance aware scheduling techniques that can be used to allocate tasks to devices. We evaluate our techniques using a pathology image analysis application used to investigate brain cancer morphology, and our experimental evaluation shows that the proposed scheduling strategies significantly outperforms other efficient scheduling techniques, such as Heterogeneous Earliest Finish Time - HEFT, in cooperative executions using CPUs, GPUs, and MICs. We also experimentally show that our strategies are less sensitive to inaccuracy in the scheduling input data and that the performance gains are maintained as the application scales. PMID:26640423
Summary of Results from the Risk Management Program for the Mars Microrover Flight Experiment
NASA Technical Reports Server (NTRS)
Shishko, Robert; Matijevic, Jacob R.
2000-01-01
On 4 July 1997, the Mars Pathfinder landed on the surface of Mars carrying the first planetary rover, known as the Sojourner. Formally known as the Microrover Flight Experiment (MFEX), the Sojourner was a low cost, high-risk technology demonstration, in which new risk management techniques were tried. This paper summarizes the activities and results of the effort to conduct a low-cost, yet meaningful risk management program for the MFEX. The specific activities focused on cost, performance, schedule, and operations risks. Just as the systems engineering process was iterative and produced successive refinements of requirements, designs, etc., so was the risk management process. Qualitative risk assessments were performed first to gain some insights for refining the microrover design and operations concept. These then evolved into more quantitative analyses. Risk management lessons from the manager's perspective is presented for other low-cost, high-risk space missions.
International Acquisition Programs: Variables Beyond Cost, Schedule and Performance
2015-02-17
Academy with a Bachelor of Science Degree in Human Factors Engineering and a Masters of Operational Art and Science from Air Command and Staff...Lt Col, USAF A Research Report Submitted to the Faculty In Partial Fulfillment of the Graduation Requirements Advisor: Col Kenneth Tatum 17...5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS
20 CFR 402.165 - Fee schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC... costs of operating the machine, plus the actual cost of the materials used, plus charges for the time...
42 CFR 447.76 - Public schedule.
Code of Federal Regulations, 2010 CFR
2010-10-01
... limit on premiums and cost sharing or just cost sharing. (4) Mechanisms for making payments for required... State must make the public schedule available to the following: (1) Beneficiaries, at the time of their..., or aggregate limits are revised. (2) Applicants, at the time of application. (3) All participating...
NASA Technical Reports Server (NTRS)
1984-01-01
The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.
Heritage Systems Engineering Lessons from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for all five missions studied. The cost and schedule growth was not found to be the result of technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the systemwide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study s lessons learned in more detail and offers suggestions for improving the project s ability to identify and manage the technology and heritage risks inherent in the design solution.
Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for four of the five missions studied. The cost and schedule growth was not found to result from technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study's lessons learned in more detail and offers suggestions for improving the project's ability to identify and manage the technology and heritage risks inherent in the design solution.
EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects
NASA Technical Reports Server (NTRS)
Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris
2018-01-01
The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.
An approach to rescheduling activities based on determination of priority and disruptivity
NASA Technical Reports Server (NTRS)
Sponsler, Jeffrey L.; Johnston, Mark D.
1990-01-01
A constraint-based scheduling system called SPIKE is being used to create long term schedules for the Hubble Space Telescope. Feedback for the spacecraft or from other ground support systems may invalidate some scheduling decisions and those activities concerned must be reconsidered. A function rescheduling priority is defined which for a given activity performs a heuristic analysis and produces a relative numerical value which is used to rank all such entities in the order that they should be rescheduled. A function disruptivity is also defined that is used to place a relative numeric value on how much a pre-existing schedule would be changed in order to reschedule an activity. Using these functions, two algorithms (a stochastic neural network approach and an exhaustive search approach) are proposed to find the best place to reschedule an activity. Prototypes were implemented and preliminary testing reveals that the exhaustive technique produces only marginally better results at much greater computational cost.
Innovative routing and scheduling concepts for transit systems.
DOT National Transportation Integrated Search
1984-01-01
The objective of this research was to investigate innovative routing and scheduling concepts to determine how transit systems in Virginia may improve ridership and reduce operating costs. Information on innovative routing and scheduling concepts was ...
Designing an optimal software intensive system acquisition: A game theoretic approach
NASA Astrophysics Data System (ADS)
Buettner, Douglas John
The development of schedule-constrained software-intensive space systems is challenging. Case study data from national security space programs developed at the U.S. Air Force Space and Missile Systems Center (USAF SMC) provide evidence of the strong desire by contractors to skip or severely reduce software development design and early defect detection methods in these schedule-constrained environments. The research findings suggest recommendations to fully address these issues at numerous levels. However, the observations lead us to investigate modeling and theoretical methods to fundamentally understand what motivated this behavior in the first place. As a result, Madachy's inspection-based system dynamics model is modified to include unit testing and an integration test feedback loop. This Modified Madachy Model (MMM) is used as a tool to investigate the consequences of this behavior on the observed defect dynamics for two remarkably different case study software projects. Latin Hypercube sampling of the MMM with sample distributions for quality, schedule and cost-driven strategies demonstrate that the higher cost and effort quality-driven strategies provide consistently better schedule performance than the schedule-driven up-front effort-reduction strategies. Game theory reasoning for schedule-driven engineers cutting corners on inspections and unit testing is based on the case study evidence and Austin's agency model to describe the observed phenomena. Game theory concepts are then used to argue that the source of the problem and hence the solution to developers cutting corners on quality for schedule-driven system acquisitions ultimately lies with the government. The game theory arguments also lead to the suggestion that the use of a multi-player dynamic Nash bargaining game provides a solution for our observed lack of quality game between the government (the acquirer) and "large-corporation" software developers. A note is provided that argues this multi-player dynamic Nash bargaining game also provides the solution to Freeman Dyson's problem, for a way to place a label of good or bad on systems.
NASA Technical Reports Server (NTRS)
1974-01-01
The results of the updated 30-day life sciences dedicated laboratory scheduling and costing activities are documented, and the 'low cost' methodology used to establish individual equipment item costs is explained in terms of its allowances for equipment that is commerical off-the-shelf, modified commercial, and laboratory prototype; a method which significantly lowers program costs. The costs generated include estimates for non-recurring development, recurring production, and recurring operations costs. A cost for a biomedical emphasis laboratory and a Delta cost to provide a bioscience and technology laboratory were also generated. All cost reported are commensurate with the design and schedule definitions available.
Fee-for-service payment - an evil practice that must be stamped out?
Ikegami, Naoki
2015-02-01
Co-opting physicians to regulate Fee-for-Service (FFS) payment is more feasible and simpler to administer than capitation, Diagnosis-Related Groups (DRGs) and pay-for-performance. The key lies in designing and revising the fee schedule, which not only defines and sets the fee for each item, but also the conditions of billing. Adherence to these regulations must be strictly audited in order to control volume and costs, and to assure quality. The fee schedule requires periodic revisions on an item-by-item basis in order to maintain balance among the providers, to list new drugs, devices and equipment, and to reflect the lower market prices of existing ones. Implementing the fee schedule will facilitate the control of balance billing and extra billing, and the introduction of more sophisticated methods of payment in the future.
Center for Ground Vehicle Development and Integration
2011-04-22
UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations
Shuttle payload interface verification equipment study. Volume 3: Specification data
NASA Technical Reports Server (NTRS)
1976-01-01
A complete description is given of the IVE physical and performance design requirements as evolved in this study. The data are presented in a format to facilitate the development of an item specification. Data were used to support the development of the project plan data (schedules, cost, etc.) contained in Volume 4 of this report.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
... defray the Institutional Broker's transaction fee costs. Also, related to clearing submissions, only... fee schedule to allocate additional costs specifically to the Institutional Brokers as an equitable... Change To Alter Its Fee Schedule To Amend Its Institutional Broker Credits November 8, 2012. Pursuant to...
A transportation-scheduling system for managing silvicultural projects
Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald
2005-01-01
A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...
Martin-Gill, Christian; Barger, Laura K; Moore, Charity G; Higgins, J Stephen; Teasley, Ellen M; Weiss, Patricia M; Condle, Joseph P; Flickinger, Katharyn L; Coppler, Patrick J; Sequeira, Denisse J; Divecha, Ayushi A; Matthews, Margaret E; Lang, Eddy S; Patterson, P Daniel
2018-02-15
Scheduled napping during work shifts may be an effective way to mitigate fatigue-related risk. This study aimed to critically review and synthesize existing literature on the impact of scheduled naps on fatigue-related outcomes for EMS personnel and similar shift worker groups. A systematic literature review was performed of the impact of a scheduled nap during shift work on EMS personnel or similar shift workers. The primary (critical) outcome of interest was EMS personnel safety. Secondary (important) outcomes were patient safety; personnel performance; acute states of fatigue, alertness, and sleepiness; indicators of sleep duration and/or quality; employee retention/turnover; indicators of long-term health; and cost to the system. Meta-analyses were performed to evaluate the impact of napping on a measure of personnel performance (the psychomotor vigilance test [PVT]) and measures of acute fatigue. Of 4,660 unique records identified, 13 experimental studies were determined relevant and summarized. The effect of napping on reaction time measured at the end of shift was small and non-significant (SMD 0.12, 95% CI -0.13 to 0.36; p = 0.34). Napping during work did not change reaction time from the beginning to the end of the shift (SMD -0.01, 95% CI -25.0 to 0.24; p = 0.96). Naps had a moderate, significant effect on sleepiness measured at the end of shift (SMD 0.40, 95% CI 0.09 to 0.72; p = 0.01). The difference in sleepiness from the start to the end of shift was moderate and statistically significant (SMD 0.41, 95% CI 0.09 to 0.72; p = 0.01). Reviewed literature indicated that scheduled naps at work improved performance and decreased fatigue in shift workers. Further research is required to identify the optimal timing and duration of scheduled naps to maximize the beneficial outcomes.
NASA Technical Reports Server (NTRS)
1985-01-01
The 3rd Quarter Status Report on DFVLR's ROSAT project confirms that with regard to technical performance and costs the project is on schedule. The valid schedule for engineering model and flight model completion on May 7, 1985 leads to a launch date on October 30, 1987. Progress in each department is compared to and explained with regard to the milestone plan. Continued problems with the gold damping of the FM-mirror system and contamination of the sterile rooms where the mirrors are stored have led to postponement of milestone 7. It is not yet completely clear to what extent all successive milestones will be affected by this factor.
1992-03-01
DOWNGRADING SCHEDULE Aptvdfo uii 4101tt;dsrttto i ilmti 4 PERFORMING ORGANIZATION REPORT NUMBER( S ) 5 MONITORING ORGANIZATION REPORT NUMBE I~’’i) 6tt NAME...CT MAN A(TEHSI IGUIJ.I) K NOW AIOUIt’ tS’I’ ANDI SClI IED11L11 M A N At Ill:EN’I 1? PERSONAL AUTHOR( S ) (’aaattnu.IlairlerineN. 13ai TYPE OF REPORT 13b...tat I )rlii-I ova Ia loo I S 17 COSATI CODES 18. SUBJECT TERMS (continue on reverse if necessary and identify by blocl, nnwibel) HlELD I ROUP I
Show me the money: the implications of Schedule H.
Salinsky, Eileen
2009-04-21
Responding to policymakers' concerns, the Internal Revenue Service (IRS) implemented significant new hospital community benefit reporting under Schedule H of its revised Form 990, the return used by tax-exempt organizations. This issue brief considers the policy implications of the quantitative and qualitative information that hospitals are now mandated to report through Schedule H, including the costs associated with charity care, bad debt, and the unreimbursed costs of Medicaid and Medicare. The paper examines unresolved issues related to the new reporting requirements, such as controversies regarding the scope of Schedule H, and considers the potential for these reports to influence IRS oversight activities, legislative action, and hospital policies and practices.
Cost and schedule analytical techniques development
NASA Technical Reports Server (NTRS)
1994-01-01
This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.
Sankaran, Ramanan; Angel, Jordan; Brown, W. Michael
2015-04-08
The growth in size of networked high performance computers along with novel accelerator-based node architectures has further emphasized the importance of communication efficiency in high performance computing. The world's largest high performance computers are usually operated as shared user facilities due to the costs of acquisition and operation. Applications are scheduled for execution in a shared environment and are placed on nodes that are not necessarily contiguous on the interconnect. Furthermore, the placement of tasks on the nodes allocated by the scheduler is sub-optimal, leading to performance loss and variability. Here, we investigate the impact of task placement on themore » performance of two massively parallel application codes on the Titan supercomputer, a turbulent combustion flow solver (S3D) and a molecular dynamics code (LAMMPS). Benchmark studies show a significant deviation from ideal weak scaling and variability in performance. The inter-task communication distance was determined to be one of the significant contributors to the performance degradation and variability. A genetic algorithm-based parallel optimization technique was used to optimize the task ordering. This technique provides an improved placement of the tasks on the nodes, taking into account the application's communication topology and the system interconnect topology. As a result, application benchmarks after task reordering through genetic algorithm show a significant improvement in performance and reduction in variability, therefore enabling the applications to achieve better time to solution and scalability on Titan during production.« less
Explanation of Change Cost and Schedule Growth Study Interim Status Briefing
NASA Technical Reports Server (NTRS)
Croonce, Thomas; Bitten, Bob; Emmons, Debra
2010-01-01
This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects. A second goal was to determine the percentage of growth that was outside the control of the project. The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time. This briefing reviews the results of the study of the first 20 missions.
Comparison of OPC job prioritization schemes to generate data for mask manufacturing
NASA Astrophysics Data System (ADS)
Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark
2015-03-01
Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Samaan, Nader A.; Milligan, Michael; Hunsaker, Matthew
This paper introduces a Production Cost Modeling (PCM) approach to evaluate the benefits of intra-hour scheduling between Balancing Authorities (BAs). The system operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)-real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the real-time simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current real-time operation with hourly schedules, a new constraint was introduced to force each BAmore » net exchange schedule deviation from HA schedules to be within NERC ACE limits. Case studies that investigate the benefits of moving from hourly exchange schedules between WECC BAs into 10-min exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Samaan, Nader; Milligan, Michael; Hunsaker, Matt
This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA netmore » exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less
Orbit transfer vehicle engine study. Volume 2: Technical report
NASA Technical Reports Server (NTRS)
1980-01-01
The orbit transfer vehicle (OTV) engine study provided parametric performance, engine programmatic, and cost data on the complete propulsive spectrum that is available for a variety of high energy, space maneuvering missions. Candidate OTV engines from the near term RL 10 (and its derivatives) to advanced high performance expander and staged combustion cycle engines were examined. The RL 10/RL 10 derivative performance, cost and schedule data were updated and provisions defined which would be necessary to accommodate extended low thrust operation. Parametric performance, weight, envelope, and cost data were generated for advanced expander and staged combustion OTV engine concepts. A prepoint design study was conducted to optimize thrust chamber geometry and cooling, engine cycle variations, and controls for an advanced expander engine. Operation at low thrust was defined for the advanced expander engine and the feasibility and design impact of kitting was investigated. An analysis of crew safety and mission reliability was conducted for both the staged combustion and advanced expander OTV engine candidates.
Optimal pre-scheduling of problem remappings
NASA Technical Reports Server (NTRS)
Nicol, David M.; Saltz, Joel H.
1987-01-01
A large class of scientific computational problems can be characterized as a sequence of steps where a significant amount of computation occurs each step, but the work performed at each step is not necessarily identical. Two good examples of this type of computation are: (1) regridding methods which change the problem discretization during the course of the computation, and (2) methods for solving sparse triangular systems of linear equations. Recent work has investigated a means of mapping such computations onto parallel processors; the method defines a family of static mappings with differing degrees of importance placed on the conflicting goals of good load balance and low communication/synchronization overhead. The performance tradeoffs are controllable by adjusting the parameters of the mapping method. To achieve good performance it may be necessary to dynamically change these parameters at run-time, but such changes can impose additional costs. If the computation's behavior can be determined prior to its execution, it can be possible to construct an optimal parameter schedule using a low-order-polynomial-time dynamic programming algorithm. Since the latter can be expensive, the performance is studied of the effect of a linear-time scheduling heuristic on one of the model problems, and it is shown to be effective and nearly optimal.
Application of the Life Safety Code to a Historic Test Stand
NASA Technical Reports Server (NTRS)
Askins, Bruce; Lemke, Paul R.; Lewis, William L.; Covell, Carol C.
2011-01-01
NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2011-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.
Space shuttle system program definition. Volume 4: Cost and schedule report
NASA Technical Reports Server (NTRS)
1972-01-01
The supporting cost and schedule data for the second half of the Space Shuttle System Phase B Extension Study is summarized. The major objective for this period was to address the cost/schedule differences affecting final selection of the HO orbiter space shuttle system. The contending options under study included the following booster launch configurations: (1) series burn ballistic recoverable booster (BRB), (2) parallel burn ballistic recoverable booster (BRB), (3) series burn solid rocket motors (SRM's), and (4) parallel burn solid rocket motors (SRM's). The implications of varying payload bay sizes for the orbiter, engine type for the ballistics recoverable booster, and SRM motors for the solid booster were examined.
Heatpipe power system and heatpipe bimodal system design and development options
NASA Technical Reports Server (NTRS)
Houts, M. G.; Poston, D. I.; Emrich, W. J., Jr.
1997-01-01
The Heatpipe Power System (HPS) is a potential, near-term, low-cost space fission power system. The Heatpipe Bimodal System (HBS) is a potential, near-term, low-cost space fission power and/or propulsion system. Both systems will be composed of independent modules, and all components operate within the existing databases. The HPS and HBS have relatively few system integration issues; thus, the successful development of a module is a significant step toward verifying system feasibility and performance estimates. A prototypic HPS module is being fabricated, and testing is scheduled to begin in November 1996. A successful test will provide high confidence that the HPS can achieve its predicted performance.
11th Annual CMMI Technology Conference and User Group
2011-11-17
Examples of triggers may include: – Cost performance – Schedule performance – Results of management reviews – Occurrence of the risk • as a...Analysis (PHA) – Method 3 – Through bottom- up analysis of design data (e.g., flow diagrams, Failure Mode Effects and Criticality Analysis (FMECA...of formal reviews and the setting up of delta or follow- up reviews can be used to give the organization more places to look at the products as they
Going Boldly Beyond: Progress on NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Singer, Jody; Crumbly, Chris
2013-01-01
NASA's Space Launch System is implementing an evolvable configuration approach to system development in a resource-constrained era. Legacy systems enable non-traditional development funding and contribute to sustainability and affordability. Limited simultaneous developments reduce cost and schedule risk. Phased approach to advanced booster development enables innovation and competition, incrementally demonstrating affordability and performance enhancements. Advanced boosters will provide performance for the most capable heavy lift launcher in history, enabling unprecedented space exploration benefiting all of humanity.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Mascareñas, A; Salinas, J; Tasset-Tisseau, A; Mascareñas, C; Khan, M M
2005-06-01
The World Health Organization recommends that all children aged less than 5 years should be vaccinated against polio through intensive immunization programmes as well as routine immunization. A national immunization week (NIW) was held in February 2002 in the Monterrey district of Mexico. A prospective micro-costing study was conducted to measure the total cost to the state of the NIW, the cost profile, and the ratio of cost per immunization contact to cost per dose of oral polio vaccine (OPV), and to compare OPV and inactive polio vaccine (IPV) in economic terms. Two scenarios were used as the basis for calculation. The cost of volunteers was excluded from the "lower-cost scenario" and included in the "upper-cost scenario". The total cost of the NIW was USD 100,454 for the lower-cost scenario and USD 156,614 for the upper-cost scenario. The major part of the costs was personnel costs (67.30 and 77.53% of the total costs in the lower- and upper-cost scenario, respectively). The ratio of cost per immunization contact to cost per dose of OPV was 6.45 for the lower-cost scenario and 10.05 for the upper-cost scenario. Changing from the current OPV-based intensive and routine schedule to a sequential IPV-OPV routine schedule would save USD 14.52 per vaccinated child, and changing to a full IPV routine schedule would save USD 9.41 per vaccinated child.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
...-Regulatory Organizations; NYSE Amex LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Implementing Changes to the Per Contract Execution Costs for Certain Participants March 9, 2012. Pursuant to... Schedule (``Fee Schedule'') to increase the per contract execution costs for certain participants. The text...
ERIC Educational Resources Information Center
Mitchell, Susan Marie
2012-01-01
Uncontrollable costs, schedule overruns, and poor end product quality continue to plague the software engineering field. Innovations formulated with the expectation to minimize or eliminate cost, schedule, and quality problems have generally fallen into one of three categories: programming paradigms, software tools, and software process…
75 FR 66075 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
...: Cost-Based Rate Schedule No. 114--Compliance Filing to be effective 10/ 1/2010. Filed Date: 10/19/2010...: Sierra Pacific Power Company submits tariff filing per 35: Cost-Based Rate Schedule No. 57--Compliance... Tariff to remove the price cap regarding the assignment of Avista transmission pursuant to Order 739, to...
Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody
2006-01-01
The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.
TTSA: An Effective Scheduling Approach for Delay Bounded Tasks in Hybrid Clouds.
Yuan, Haitao; Bi, Jing; Tan, Wei; Zhou, MengChu; Li, Bo Hu; Li, Jianqiang
2017-11-01
The economy of scale provided by cloud attracts a growing number of organizations and industrial companies to deploy their applications in cloud data centers (CDCs) and to provide services to users around the world. The uncertainty of arriving tasks makes it a big challenge for private CDC to cost-effectively schedule delay bounded tasks without exceeding their delay bounds. Unlike previous studies, this paper takes into account the cost minimization problem for private CDC in hybrid clouds, where the energy price of private CDC and execution price of public clouds both show the temporal diversity. Then, this paper proposes a temporal task scheduling algorithm (TTSA) to effectively dispatch all arriving tasks to private CDC and public clouds. In each iteration of TTSA, the cost minimization problem is modeled as a mixed integer linear program and solved by a hybrid simulated-annealing particle-swarm-optimization. The experimental results demonstrate that compared with the existing methods, the optimal or suboptimal scheduling strategy produced by TTSA can efficiently increase the throughput and reduce the cost of private CDC while meeting the delay bounds of all the tasks.
NASA Technical Reports Server (NTRS)
Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A
1992-01-01
The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
NASA Technical Reports Server (NTRS)
Phillips, Dave; Haas, William; Barth, Tim; Benjamin, Perakath; Graul, Michael; Bagatourova, Olga
2005-01-01
Range Process Simulation Tool (RPST) is a computer program that assists managers in rapidly predicting and quantitatively assessing the operational effects of proposed technological additions to, and/or upgrades of, complex facilities and engineering systems such as the Eastern Test Range. Originally designed for application to space transportation systems, RPST is also suitable for assessing effects of proposed changes in industrial facilities and large organizations. RPST follows a model-based approach that includes finite-capacity schedule analysis and discrete-event process simulation. A component-based, scalable, open architecture makes RPST easily and rapidly tailorable for diverse applications. Specific RPST functions include: (1) definition of analysis objectives and performance metrics; (2) selection of process templates from a processtemplate library; (3) configuration of process models for detailed simulation and schedule analysis; (4) design of operations- analysis experiments; (5) schedule and simulation-based process analysis; and (6) optimization of performance by use of genetic algorithms and simulated annealing. The main benefits afforded by RPST are provision of information that can be used to reduce costs of operation and maintenance, and the capability for affordable, accurate, and reliable prediction and exploration of the consequences of many alternative proposed decisions.
System engineering of complex optical systems for mission assurance and affordability
NASA Astrophysics Data System (ADS)
Ahmad, Anees
2017-08-01
Affordability and reliability are equally important as the performance and development time for many optical systems for military, space and commercial applications. These characteristics are even more important for the systems meant for space and military applications where total lifecycle costs must be affordable. Most customers are looking for high performance optical systems that are not only affordable but are designed with "no doubt" mission assurance, reliability and maintainability in mind. Both US military and commercial customers are now demanding an optimum balance between performance, reliability and affordability. Therefore, it is important to employ a disciplined systems design approach for meeting the performance, cost and schedule targets while keeping affordability and reliability in mind. The US Missile Defense Agency (MDA) now requires all of their systems to be engineered, tested and produced according to the Mission Assurance Provisions (MAP). These provisions or requirements are meant to ensure complex and expensive military systems are designed, integrated, tested and produced with the reliability and total lifecycle costs in mind. This paper describes a system design approach based on the MAP document for developing sophisticated optical systems that are not only cost-effective but also deliver superior and reliable performance during their intended missions.
Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions
NASA Technical Reports Server (NTRS)
Grabbe, Shon; Chan, William N.; Mukherjee, Avijit
2012-01-01
Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times of the aircraft. Findings from these initial experiments indicate that it is possible to schedule arrivals into Anchorage with minimal delays under low-visibility conditions with less disruption to high-cost, international flights.
Practice expenses in the MFS (Medicare fee schedule): the service-class approach.
Latimer, E A; Kane, N M
1995-01-01
The practice expense component of the Medicare fee schedule (MFS), which is currently based on historical charges and rewards physician procedures at the expense of cognitive services, is due to be changed by January 1, 1998. The Physician Payment Review Commission (PPRC) and others have proposed microcosting direct costs and allocating all indirect costs on a common basis, such as physician time or work plus direct costs. Without altering the treatment of direct costs, the service-class approach disaggregates indirect costs into six practice function costs. The practice function costs are then allocated to classes of services using cost-accounting and statistical methods. This approach would make the practice expense component more resource-based than other proposed alternatives.
Does Shortening the School Week Impact Student Performance? Evidence from the Four-Day School Week
ERIC Educational Resources Information Center
Anderson, D. Mark; Walker, Mary Beth
2015-01-01
School districts use a variety of policies to close budget gaps and stave off teacher layoffs and furloughs. More schools are implementing four-day school weeks to reduce overhead and transportation costs. The four-day week requires substantial schedule changes as schools must increase the length of their school day to meet minimum instructional…
Application of TOS/AMS to TDRS E and F
NASA Technical Reports Server (NTRS)
1984-01-01
The development of the Transfer Orbit Stage (TOS) and the study of an Apogee and Maneuvering Stage (AMS) to be used in conjunction with the TOS are presented. A definition of the TOS/AMS configuration is provided along with a detailed design analysis including layout drawings, component definition, performance, sts and spacecraft interface definition, schedules, cost estimates, and specifications documents.
Parts and Components Reliability Assessment: A Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia
2009-01-01
System reliability assessment is a methodology which incorporates reliability analyses performed at parts and components level such as Reliability Prediction, Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA) to assess risks, perform design tradeoffs, and therefore, to ensure effective productivity and/or mission success. The system reliability is used to optimize the product design to accommodate today?s mandated budget, manpower, and schedule constraints. Stand ard based reliability assessment is an effective approach consisting of reliability predictions together with other reliability analyses for electronic, electrical, and electro-mechanical (EEE) complex parts and components of large systems based on failure rate estimates published by the United States (U.S.) military or commercial standards and handbooks. Many of these standards are globally accepted and recognized. The reliability assessment is especially useful during the initial stages when the system design is still in the development and hard failure data is not yet available or manufacturers are not contractually obliged by their customers to publish the reliability estimates/predictions for their parts and components. This paper presents a methodology to assess system reliability using parts and components reliability estimates to ensure effective productivity and/or mission success in an efficient manner, low cost, and tight schedule.
Resource-constrained scheduling with hard due windows and rejection penalties
NASA Astrophysics Data System (ADS)
Garcia, Christopher
2016-09-01
This work studies a scheduling problem where each job must be either accepted and scheduled to complete within its specified due window, or rejected altogether. Each job has a certain processing time and contributes a certain profit if accepted or penalty cost if rejected. There is a set of renewable resources, and no resource limit can be exceeded at any time. Each job requires a certain amount of each resource when processed, and the objective is to maximize total profit. A mixed-integer programming formulation and three approximation algorithms are presented: a priority rule heuristic, an algorithm based on the metaheuristic for randomized priority search and an evolutionary algorithm. Computational experiments comparing these four solution methods were performed on a set of generated benchmark problems covering a wide range of problem characteristics. The evolutionary algorithm outperformed the other methods in most cases, often significantly, and never significantly underperformed any method.
Outsourcing and scheduling for a two-machine flow shop with release times
NASA Astrophysics Data System (ADS)
Ahmadizar, Fardin; Amiri, Zeinab
2018-03-01
This article addresses a two-machine flow shop scheduling problem where jobs are released intermittently and outsourcing is allowed. The first operations of outsourced jobs are processed by the first subcontractor, they are transported in batches to the second subcontractor for processing their second operations, and finally they are transported back to the manufacturer. The objective is to select a subset of jobs to be outsourced, to schedule both the in-house and the outsourced jobs, and to determine a transportation plan for the outsourced jobs so as to minimize the sum of the makespan and the outsourcing and transportation costs. Two mathematical models of the problem and several necessary optimality conditions are presented. A solution approach is then proposed by incorporating the dominance properties with an ant colony algorithm. Finally, computational experiments are conducted to evaluate the performance of the models and solution approach.
NASA Technical Reports Server (NTRS)
1976-01-01
The feasibility of accomplishing selected atmospheric science mission using a pallet-only mode was studied. Certain unresolved issues were identified. The first issue was that of assuring that the on-board computer facility was adequate to process scientific data, control subsystems such as instrument pointing, provide mission operational program capability, and accomplish display and control. The second issue evolved from an investigation of the availability of existing substitute instruments that could be used instead of the prime instrumentation where the development tests and schedules are incompatible with the realistic budgets and shuttle vehicle schedules. Some effort was expended on identifying candidate substitute instruments, and the performance, cost, and development schedule trade-offs found during that effort were significant enough to warrant a follow-on investigation. This addendum documents the results of that follow-on effort, as it applies to the Atmospheric Sciences Facility.
2016-02-01
components. In 2010, they began an LEP to consolidate four versions of a legacy nuclear weapon, the B61 bomb , into a bomb called the B61-12 (see...Force Integrated Master Schedule BIMS Boeing Integrated Master Schedule B61 bomb B61 legacy bomb CD critical decision Cost Guide GAO Cost...are versions of the B61 bomb , an aircraft-delivered weapon that is a key component of the United States’ commitments to the North Atlantic Treaty
2015-03-26
acquisition programs’ cost and schedule. Many prior studies have focused on the overall cost of programs (the cost estimate at completion (EAC)) ( Smoker ...regression ( Smoker , 2011), the Kalman Filter Forecasting Method (Kim, 2007), and analysis of the Integrated Master Schedule (IMS). All of the...A study by Smoker demonstrated this technique by first regressing the BCWP against months and the same approach for BAC (2011). In that study
The human factors of implementing shift work in logging operations.
Mitchell, D L; Gallagher, T V; Thomas, R E
2008-10-01
A fairly recent development in the forest industry is the use of shift work in logging in the southeastern U.S. Logging company owners are implementing shift work as an opportunity to increase production and potentially reduce the cost of producing each unit of wood, without consideration of the potential impacts on the logging crew. There are many documented physiological and psychological impacts on workers from shift work in a variety of industries, although few address forestry workers in the U.S. Semi-structured interviews were performed to gather information about how logging company owners were implementing shift work in seven southeastern states. Data collected during the interviews included employee turnover, shift hours, shift scheduling, safety considerations, and production impacts. Various work schedules were employed. The majority of the schedules encompassed less than 24 hours per day. Permanent and rotating shift schedules were found. None of the logging company owners used more than two crews in a 24-hour period. Additional safety precautions were implemented as a result of working after dark. No in-woods worker accidents or injuries were reported by any of those interviewed. Results indicate that a variety of work schedules can be successfully implemented in the southeastern logging industry.
Asteroid Crewed Segment Mission Lean Development
NASA Technical Reports Server (NTRS)
Gard, Joe; McDonald, Mark; Jermstad, Wayne
2014-01-01
The next generation of human spaceflight missions presents numerous challenges to designers that must be addressed to produce a feasible concept. The specific challenges of designing an exploration mission utilizing the Space Launch System and the Orion spacecraft to carry astronauts beyond earth orbit to explore an asteroid stored in a distant retrograde orbit around the moon will be addressed. Mission designers must carefully balance competing constraints including cost, schedule, risk, and numerous spacecraft performance metrics including launch mass, nominal landed mass, abort landed mass, mission duration, consumable limits and many others. The Asteroid Redirect Crewed Mission will be described along with results from the concurrent mission design trades that led to its formulation. While the trades presented are specific to this mission, the integrated process is applicable to any potential future mission. The following trades were critical in the mission formulation and will be described in detail: 1) crew size, 2) mission duration, 3) trajectory design, 4) docking vs grapple, 5) extravehicular activity tasks, 6) launch mass and integrated vehicle performance, 7) contingency performance, 8) crew consumables including food, clothing, oxygen, nitrogen and water, and 9) mission risk. The additional Orion functionality required to perform the Asteroid Redirect Crewed Mission and how it is incorporated while minimizing cost, schedule and mass impacts will be identified. Existing investments in the NASA technology portfolio were leveraged to provide the added functionality that will be beneficial to future exploration missions. Mission kits are utilized to augment Orion with the necessary functionality without introducing costly new requirements to the mature Orion spacecraft design effort. The Asteroid Redirect Crewed Mission provides an exciting early mission for the Orion and SLS while providing a stepping stone to even more ambitious missions in the future.
A heuristic approach to incremental and reactive scheduling
NASA Technical Reports Server (NTRS)
Odubiyi, Jide B.; Zoch, David R.
1989-01-01
An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.
1993-08-01
the orthotic and prosthetic fee schedule that do not require professional fabrication or fitting services . We also identified considerable variation...transplant, further improvements are needed. Medicare : Physicians Who Invest in Imaging Centers Refer More Patients for More Costly Services (Testimony...GAO/HRD-92-38R). Medicare : Program and Beneficiary Costs Under Durable Medical Equipment Fee Schedules (Report, July 7, 1992, GAO/HRD-92-78). Medicaid
Parametric Cost and Schedule Modeling for Early Technology Development
2018-04-02
Best Paper in the Analysis Methods Category and 2017 Best Paper Overall awards. It was also presented at the 2017 NASA Cost and Schedule Symposium... Methods over the Project Life Cycle .............................................................................................. 2 Figure 2. Average...information contribute to the lack of data, objective models, and methods that can be broadly applied in early planning stages. Scientific
50 CFR 14.94 - What fees apply to me?
Code of Federal Regulations, 2010 CFR
2010-10-01
... diem costs associated with inspection of the shipment. These fees are in place of, not in addition to... Federal holiday. (h) Fee schedule. Inspection fee schedule Fee cost per shipment per year 2008 2009 2010... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false What fees apply to me? 14.94 Section 14.94...
Cost-effectiveness of hepatitis A vaccination in Indonesia.
Suwantika, Auliya A; Beutels, Philippe; Postma, Maarten J
2014-01-01
This study aims to assess the cost-effectiveness of hepatitis A immunization in Indonesia, including an explicit comparison between one-dose and two-dose vaccines. An age-structured cohort model based on a decision tree was developed for the 2012 Indonesia birth cohort. Using the model, we made a comparison on the use of two-dose and one-dose vaccines. The model involved a 70-year time horizon with 1-month cycles for children less than 2 years old and annually thereafter. Monte Carlo simulations were used to examine the economic acceptability and affordability of the hepatitis A vaccination. Vaccination would save US$ 3,795,148 and US$ 2,892,920 from the societal perspective, for the two-dose and one-dose vaccine schedules, respectively, in the context of hepatitis A treatment. It also would save 8917 and 6614 discounted quality-adjusted-life-years (QALYs), respectively. With the vaccine price of US$ 3.21 per dose, the implementation of single dose vaccine would yield an incremental cost-effectiveness ratio (ICER) of US$ 4933 per QALY gained versus no vaccination, whereas the two-dose versus one-dose schedule would cost US$ 14 568 per QALY gained. Considering the 2012 gross-domestic-product (GDP) per capita in Indonesia of US$ 3557, the results indicate that hepatitis A vaccination would be a cost-effective intervention, both for the two-dose and one-dose vaccine schedules in isolation, but two-dose vaccination would no longer be cost-effective if one-dose vaccination is a feasible option. Vaccination would be 100% affordable at budgets of US$ 71,408 000 and US$ 37,690,000 for the implementation of the two-dose and one-dose vaccine schedules, respectively. The implementation of hepatitis A vaccination in Indonesia would be a cost-effective health intervention under the market vaccine price. Given the budget limitations, the use of a one-dose-vaccine schedule would be more realistic to be applied than a two-dose schedule. The vaccine price, mortality rate and discount rate were the most influential parameters impacting the ICERs.
Cost-effectiveness of hepatitis A vaccination in Indonesia
Suwantika, Auliya A; Beutels, Philippe; Postma, Maarten J
2014-01-01
Objective This study aims to assess the cost-effectiveness of hepatitis A immunization in Indonesia, including an explicit comparison between one-dose and two-dose vaccines. Methods An age-structured cohort model based on a decision tree was developed for the 2012 Indonesia birth cohort. Using the model, we made a comparison on the use of two-dose and one-dose vaccines. The model involved a 70-year time horizon with 1-month cycles for children less than 2 years old and annually thereafter. Monte Carlo simulations were used to examine the economic acceptability and affordability of the hepatitis A vaccination. Results Vaccination would save US$ 3 795 148 and US$ 2 892 920 from the societal perspective, for the two-dose and one-dose vaccine schedules, respectively, in the context of hepatitis A treatment. It also would save 8917 and 6614 discounted quality-adjusted-life-years (QALYs), respectively. With the vaccine price of US$ 3.21 per dose, the implementation of single dose vaccine would yield an incremental cost-effectiveness ratio (ICER) of US$ 4933 per QALY gained versus no vaccination, whereas the two-dose versus one-dose schedule would cost US$ 14 568 per QALY gained. Considering the 2012 gross-domestic-product (GDP) per capita in Indonesia of US$ 3557, the results indicate that hepatitis A vaccination would be a cost-effective intervention, both for the two-dose and one-dose vaccine schedules in isolation, but two-dose vaccination would no longer be cost-effective if one-dose vaccination is a feasible option. Vaccination would be 100% affordable at budgets of US$ 71 408 000 and US$ 37 690 000 for the implementation of the two-dose and one-dose vaccine schedules, respectively. Conclusions The implementation of hepatitis A vaccination in Indonesia would be a cost-effective health intervention under the market vaccine price. Given the budget limitations, the use of a one-dose-vaccine schedule would be more realistic to be applied than a two-dose schedule. The vaccine price, mortality rate and discount rate were the most influential parameters impacting the ICERs. PMID:25424941
Clark, Sarah J; Cowan, Anne E; Freed, Gary L
2011-04-01
Combination vaccines have been endorsed as a means to decrease the number of injections needed to complete the childhood immunization schedule, yet anecdotal reports suggest that private providers lose money on combination vaccines. The objective of this study was to determine whether practices purchasing combination vaccines had significantly different vaccine costs and reimbursement compared to practices that were not purchasing combination vaccines. Using cross-sectional purchase and insurer payment data collected from a targeted sample of private practices in five US states, we calculated the average total vaccine cost and reimbursement across the childhood immunization schedule. The average vaccine purchase cost across the childhood schedule was significantly higher for practices using a combined vaccine with diphtheria, tetanus, acellular pertussis vaccine, inactivated polio vaccine, and Hepatitis B vaccine (DTaP-IPV-HepB) than for practices using either separate vaccine products or a combined vaccine with Haemophilus influenzae, type b vaccine and Hepatitis B vaccine (Hib-HepB). The average insurer payment for vaccine administration across the childhood schedule was significantly lower for practices using DTaP-IPV-HepB combination vaccine than for practices using separate vaccine products. This study appears to validate anecdotal reports that vaccine purchase costs and insurer payment for combination vaccines can have a negative financial impact for practices that purchase childhood vaccines.
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
Study on the Modifications Required to Re-Engine the Lockheed D-21 Drone
NASA Technical Reports Server (NTRS)
1999-01-01
This report was prepared by Lockheed Martin (LM). The purpose of this 45 day study contract was to investigate the feasibility of using the D-21 as a Rocket Based Combined Cycle engine test-bed. The new NASA engine is entitled "Demonstration of Rocket Combined Cycle Operations (DRACO)". Four objectives were defined and modification study provide an estimation of the: (1) mudified vehicle performance; (2) required engine performance; (3) required vehicle modification; and (4) modification cost and schedule.
Teleradiology from the provider's perspective-cost analysis for a mid-size university hospital.
Rosenberg, Christian; Kroos, Kristin; Rosenberg, Britta; Hosten, Norbert; Flessa, Steffen
2013-08-01
Real costs of teleradiology services have not been systematically calculated. Pricing policies are not evidence-based. This study aims to prove the feasibility of performing an original cost analysis for teleradiology services and show break-even points to perform cost-effective practice. Based on the teleradiology services provided by the Greifswald University Hospital in northeastern Germany, a detailed process analysis and an activity-based costing model revealed costs per service unit according to eight examination categories. The Monte Carlo method was used to simulate the cost amplitude and identify pricing thresholds. Twenty-two sub-processes and four staff categories were identified. The average working time for one unit was 55 (x-ray) to 72 min (whole-body CT). Personnel costs were dominant (up to 68 %), representing lower limit costs. The Monte Carlo method showed the cost distribution per category according to the deficiency risk. Avoiding deficient pricing by a likelihood of 90 % increased the cost of a cranial CT almost twofold as compared with the lower limit cost. Original cost analysis is possible when providing teleradiology services with complex statutory requirements in place. Methodology and results provide useful data to help enhance efficiency in hospital management as well as implement realistic reimbursement fees. • Analysis of original costs of teleradiology is possible for a providing hospital • Results discriminate pricing thresholds and lower limit costs to perform cost-effective practice • The study methods represent a managing tool to enhance efficiency in providing facilities • The data are useful to help represent telemedicine services in regular medical fee schedules.
Design for an 8 Meter Monolithic UV/OIR Space Telescope
NASA Technical Reports Server (NTRS)
Stahl, H. Philip; Postman, Marc; Hornsby, Linda; Hopkins, Randall; Mosier, Gary E.; Pasquale, Bert A.; Arnold, William R.
2009-01-01
ATLAST-8 is an 8-meter monolithic UV/optical/NIR space observatory to be placed in orbit at Sun-Earth L2 by NASA's planned Ares V cargo launch vehicle. The ATLAST-8 will yield fundamental astronomical breakthroughs. The mission concept utilizes two enabling technologies: planned Ares-V launch vehicle (scheduled for 2019) and autonomous rendezvous and docking (AR&D). The unprecedented Ares-V payload and mass capacity enables the use of a massive, monolithic, thin-meniscus primary mirror - similar to a VLT or Subaru. Furthermore, it enables simple robust design rules to mitigate cost, schedule and performance risk. AR&D enables on-orbit servicing, extending mission life and enhancing science return.
Complexity analysis of the cost effectiveness of PI-led NASA science missions
NASA Astrophysics Data System (ADS)
Yoshida, J.; Cowdin, M.; Mize, T.; Kellogg, R.; Bearden, D.
For the last 20 years, NASA has allowed Principal Investigators (PIs) to manage the development of many unmanned space projects. Advocates of PI-led projects believe that a PI-led implementation can result in a project being developed at lower cost and shorter schedule than other implementation modes. This paper seeks to test this hypothesis by comparing the actual costs of NASA and other comparable projects developed under different implementation modes. The Aerospace Corporation's Complexity-Based Risk Assessment (CoBRA) analysis tool is used to normalize the projects such that the cost can be compared for equivalent project complexities. The data is examined both by complexity and by launch year. Cost growth will also be examined for any correlation with implementation mode. Defined in many NASA Announcements of Opportunity (AOs), a PI-led project is characterized by a central, single person with full responsibility for assembling a team and for the project's scientific integrity and the implementation and integrity of all other aspects of the mission, while operating under a cost cap. PIs have larger degrees of freedom to achieve the stated goals within NASA guidelines and oversight. This study leverages the definitions and results of previous National Research Council studies of PI-led projects. Aerospace has defined a complexity index, derived from mission performance, mass, power, and technology choices, to arrive at a broad representation of missions for purposes of comparison. Over a decade of research has established a correlation between mission complexity and spacecraft development cost and schedule. This complexity analysis, CoBRA, is applied to compare a PI-led set of New Frontiers, Discovery, Explorers, and Earth System Science Pathfinder missions to the overall NASA mission dataset. This reveals the complexity trends against development costs, cost growth, and development era.
Kulpeng, Wantanee; Leelahavarong, Pattara; Rattanavipapong, Waranya; Sornsrivichai, Vorasith; Baggett, Henry C.; Meeyai, Aronrag; Punpanich, Warunee; Teerawattananon, Yot
2015-01-01
Objective This study aims to evaluate the costs and outcomes of offering the 10-valent pneumococcal conjugate vaccine (PCV10) and 13-valent pneumococcal conjugate vaccine (PCV13) in Thailand compared to the current situation of no PCV vaccination. Methods Two vaccination schedules were considered: two-dose primary series plus a booster dose (2 + 1) and three-dose primary series plus a booster dose (3 + 1). A cost-utility analysis was conducted using a societal perspective. A Markov simulation model was used to estimate the relevant costs and health outcomes for a lifetime horizon. Costs were collected and values were calculated for the year 2010. The results were reported as incremental cost-effectiveness ratios (ICERs) in Thai Baht (THB) per quality adjusted life year (QALY) gained, with future costs and outcomes being discounted at 3% per annum. One-way sensitivity analysis and probabilistic sensitivity analysis using a Monte Carlo simulation were performed to assess parameter uncertainty. Results Under the base case-scenario of 2 + 1 dose schedule and a five-year protection, without indirect vaccine effects, the ICER for PCV10 and PCV13 were THB 1,368,072 and THB 1,490,305 per QALY gained, respectively. With indirect vaccine effects, the ICER of PCV10 was THB 519,399, and for PCV13 was THB 527,378. The model was sensitive to discount rate, the change in duration of vaccine protection and the incidence of pneumonia for all age groups. Conclusions At current prices, PCV10 and PCV13 are not cost-effective in Thailand. Inclusion of indirect vaccine effects substantially reduced the ICERs for both vaccines, but did not result in cost effectiveness. PMID:23588084
ACARA - AVAILABILITY, COST AND RESOURCE ALLOCATION
NASA Technical Reports Server (NTRS)
Viterna, L. A.
1994-01-01
ACARA is a program for analyzing availability, lifecycle cost, and resource scheduling. It uses a statistical Monte Carlo method to simulate a system's capacity states as well as component failure and repair. Component failures are modelled using a combination of exponential and Weibull probability distributions. ACARA schedules component replacement to achieve optimum system performance. The scheduling will comply with any constraints on component production, resupply vehicle capacity, on-site spares, or crew manpower and equipment. ACARA is capable of many types of analyses and trade studies because of its integrated approach. It characterizes the system performance in terms of both state availability and equivalent availability (a weighted average of state availability). It can determine the probability of exceeding a capacity state to assess reliability and loss of load probability. It can also evaluate the effect of resource constraints on system availability and lifecycle cost. ACARA interprets the results of a simulation and displays tables and charts for: (1) performance, i.e., availability and reliability of capacity states, (2) frequency of failure and repair, (3) lifecycle cost, including hardware, transportation, and maintenance, and (4) usage of available resources, including mass, volume, and maintenance man-hours. ACARA incorporates a user-friendly, menu-driven interface with full screen data entry. It provides a file management system to store and retrieve input and output datasets for system simulation scenarios. ACARA is written in APL2 using the APL2 interpreter for IBM PC compatible systems running MS-DOS. Hardware requirements for the APL2 system include 640K of RAM, 2Mb of extended memory, and an 80386 or 80486 processor with an 80x87 math co-processor. A dot matrix printer is required if the user wishes to print a graph from a results table. A sample MS-DOS executable is provided on the distribution medium. The executable contains licensed material from the APL2 for the IBM PC product which is program property of IBM; Copyright IBM Corporation 1988 - All rights reserved. It is distributed with IBM's permission. The standard distribution medium for this program is a set of three 5.25 inch 360K MS-DOS format diskettes. The contents of the diskettes are compressed using the PKWARE archiving tools. The utility to unarchive the files, PKUNZIP.EXE, is included. ACARA was developed in 1992.
Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models
NASA Technical Reports Server (NTRS)
Gagnier, Don; Hayner, Rick; Roza, Michael; Nosek, Thomas; Razzaghi, Andrea
2004-01-01
This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric science instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments that will be flown on the Aura s p a c m and of the Aura spacecraft bus electronics. Aura is one of NASA's Earth Observing System @OS) Program missions managed by the Goddard Space Flight Center. The test was designed to evaluate the complex interfaces in the spacecraft and instrument command and data handling (C&DH) subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during (and not before) the flight hardware integration phase can cause significant cost and schedule impacts. The testing successfully surfaced problems and led to their resolution before the full-up integration phase, saving significant cost and schedule time. This approach could be used on future environmental satellite programs involving multiple, complex scientific instruments being integrated onto a bus.
NASA Technical Reports Server (NTRS)
Clare, Loren; Clement, B.; Gao, J.; Hutcherson, J.; Jennings, E.
2006-01-01
Described recent development of communications protocols, services, and associated tools targeted to reduce risk, reduce cost and increase efficiency of IND infrastructure and supported mission operations. Space-based networking technologies developed were: a) Provide differentiated quality of service (QoS) that will give precedence to traffic that users have selected as having the greatest importance and/or time-criticality; b) Improve the total value of information to users through the use of QoS prioritization techniques; c) Increase operational flexibility and improve command-response turnaround; d) Enable new class of networked and collaborative science missions; e) Simplify applications interfaces to communications services; and f) Reduce risk and cost from a common object model and automated scheduling and communications protocols. Technologies are described in three general areas: communications scheduling, middleware, and protocols. Additionally developed simulation environment, which provides comprehensive, quantitative understanding of the technologies performance within overall, evolving architecture, as well as ability to refine & optimize specific components.
Strategies GeoCape Intelligent Observation Studies @ GSFC
NASA Technical Reports Server (NTRS)
Cappelaere, Pat; Frye, Stu; Moe, Karen; Mandl, Dan; LeMoigne, Jacqueline; Flatley, Tom; Geist, Alessandro
2015-01-01
This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.
1983-08-01
for the level of manage- 5AR ment reviewing it ., (40) The Cost Schedule Control Systems PROD R&D Criteria are not a...evolution and development of the Cost/Schedule Control Vice President, Contracts and Pricing Systems Criteria (C/SCSC), then analyze its cost impact...don’t come and ask for what we are going to war with-not He is taking the tough position to en- funding to cover it -find out what the new system
Safe to Fly: Certifying COTS Hardware for Spaceflight
NASA Technical Reports Server (NTRS)
Fichuk, Jessica L.
2011-01-01
Providing hardware for the astronauts to use on board the Space Shuttle or International Space Station (ISS) involves a certification process that entails evaluating hardware safety, weighing risks, providing mitigation, and verifying requirements. Upon completion of this certification process, the hardware is deemed safe to fly. This process from start to finish can be completed as quickly as 1 week or can take several years in length depending on the complexity of the hardware and whether the item is a unique custom design. One area of cost and schedule savings that NASA implements is buying Commercial Off the Shelf (COTS) hardware and certifying it for human spaceflight as safe to fly. By utilizing commercial hardware, NASA saves time not having to develop, design and build the hardware from scratch, as well as a timesaving in the certification process. By utilizing COTS hardware, the current detailed certification process can be simplified which results in schedule savings. Cost savings is another important benefit of flying COTS hardware. Procuring COTS hardware for space use can be more economical than custom building the hardware. This paper will investigate the cost savings associated with certifying COTS hardware to NASA s standards rather than performing a custom build.
Yoon, Sang-Young; Ko, Jeonghan; Jung, Myung-Chul
2016-07-01
The aim of study is to suggest a job rotation schedule by developing a mathematical model in order to reduce cumulative workload from the successive use of the same body region. Workload assessment using rapid entire body assessment (REBA) was performed for the model in three automotive assembly lines of chassis, trim, and finishing to identify which body part exposed to relatively high workloads at workstations. The workloads were incorporated to the model to develop a job rotation schedule. The proposed schedules prevent the exposure to high workloads successively on the same body region and minimized between-worker variance in cumulative daily workload. Whereas some of workers were successively assigned to high workload workstation under no job rotation and serial job rotation. This model would help to reduce the potential for work-related musculoskeletal disorders (WMSDs) without additional cost for engineering work, although it may need more computational time and relative complex job rotation sequences. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This appendix summarizes building characteristics used to determine heating and cooling loads for each of the five building types in each of the four regions. For the selected five buildings, the following data are attached: new and existing construction characteristics; new and existing construction thermal resistance; floor plan and elevation; people load schedule; lighting load schedule; appliance load schedule; ventilation schedule; and hot water use schedule. For the five building types (single family, apartment buildings, commercial buildings, office buildings, and schools), data are compiled in 10 appendices. These are Building Characteristics; Alternate Energy Sources and Energy Conservation Techniques Description, Costs,more » Fuel Price Scenarios; Life Cycle Cost Model; Simulation Models; Solar Heating/Cooling System; Condensed Weather; Single and Multi-Family Dwelling Characteristics and Energy Conservation Techniques; Mixed Strategies for Energy Conservation and Alternative Energy Utilization in Buildings. An extensive bibliography is given in the final appendix. (MCW)« less
Getting Defense Acquisition Right
2017-01-01
cost increases, schedule slips , and sometimes failure to deliver an acceptable or 8 Getting Defense Acquisition Right affordable...did not make any allowance for overruns, schedule slips , or increases in costs for services beyond the standard indices assumed by the Office of...that we are not taking enough risks. With respect to our major programs, I find myself pushed in two directions simultaneously by the political winds
Robust optimisation-based microgrid scheduling with islanding constraints
Liu, Guodong; Starke, Michael; Xiao, Bailu; ...
2017-02-17
This paper proposes a robust optimization based optimal scheduling model for microgrid operation considering constraints of islanding capability. Our objective is to minimize the total operation cost, including generation cost and spinning reserve cost of local resources as well as purchasing cost of energy from the main grid. In order to ensure the resiliency of a microgrid and improve the reliability of the local electricity supply, the microgrid is required to maintain enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation when the supply of power from the main grid is interrupted suddenly,more » i.e., microgrid transitions from grid-connected into islanded mode. Prevailing operational uncertainties in renewable energy resources and load are considered and captured using a robust optimization method. With proper robust level, the solution of the proposed scheduling model ensures successful islanding of the microgrid with minimum load curtailment and guarantees robustness against all possible realizations of the modeled operational uncertainties. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling model.« less
NASA Technical Reports Server (NTRS)
Levack, Daniel J. H.
2000-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.
NASA Astrophysics Data System (ADS)
Sahelgozin, M.; Alimohammadi, A.
2015-12-01
Increasing distances between locations of residence and services leads to a large number of daily commutes in urban areas. Developing subway systems has been taken into consideration of transportation managers as a response to this huge amount of travel demands. In developments of subway infrastructures, representing a temporal schedule for trains is an important task; because an appropriately designed timetable decreases Total passenger travel times, Total Operation Costs and Energy Consumption of trains. Since these variables are not positively correlated, subway scheduling is considered as a multi-criteria optimization problem. Therefore, proposing a proper solution for subway scheduling has been always a controversial issue. On the other hand, research on a phenomenon requires a summarized representation of the real world that is known as Model. In this study, it is attempted to model temporal schedule of urban trains that can be applied in Multi-Criteria Subway Schedule Optimization (MCSSO) problems. At first, a conceptual framework is represented for MCSSO. Then, an agent-based simulation environment is implemented to perform Sensitivity Analysis (SA) that is used to extract the interrelations between the framework components. These interrelations is then taken into account in order to construct the proposed model. In order to evaluate performance of the model in MCSSO problems, Tehran subway line no. 1 is considered as the case study. Results of the study show that the model was able to generate an acceptable distribution of Pareto-optimal solutions which are applicable in the real situations while solving a MCSSO is the goal. Also, the accuracy of the model in representing the operation of subway systems was significant.
HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler
NASA Technical Reports Server (NTRS)
Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.
2012-01-01
HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easton, C. R.
The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less
Madduri, Ravi K.; Sulakhe, Dinanath; Lacinski, Lukasz; Liu, Bo; Rodriguez, Alex; Chard, Kyle; Dave, Utpal J.; Foster, Ian T.
2014-01-01
We describe Globus Genomics, a system that we have developed for rapid analysis of large quantities of next-generation sequencing (NGS) genomic data. This system achieves a high degree of end-to-end automation that encompasses every stage of data analysis including initial data retrieval from remote sequencing centers or storage (via the Globus file transfer system); specification, configuration, and reuse of multi-step processing pipelines (via the Galaxy workflow system); creation of custom Amazon Machine Images and on-demand resource acquisition via a specialized elastic provisioner (on Amazon EC2); and efficient scheduling of these pipelines over many processors (via the HTCondor scheduler). The system allows biomedical researchers to perform rapid analysis of large NGS datasets in a fully automated manner, without software installation or a need for any local computing infrastructure. We report performance and cost results for some representative workloads. PMID:25342933
Madduri, Ravi K; Sulakhe, Dinanath; Lacinski, Lukasz; Liu, Bo; Rodriguez, Alex; Chard, Kyle; Dave, Utpal J; Foster, Ian T
2014-09-10
We describe Globus Genomics, a system that we have developed for rapid analysis of large quantities of next-generation sequencing (NGS) genomic data. This system achieves a high degree of end-to-end automation that encompasses every stage of data analysis including initial data retrieval from remote sequencing centers or storage (via the Globus file transfer system); specification, configuration, and reuse of multi-step processing pipelines (via the Galaxy workflow system); creation of custom Amazon Machine Images and on-demand resource acquisition via a specialized elastic provisioner (on Amazon EC2); and efficient scheduling of these pipelines over many processors (via the HTCondor scheduler). The system allows biomedical researchers to perform rapid analysis of large NGS datasets in a fully automated manner, without software installation or a need for any local computing infrastructure. We report performance and cost results for some representative workloads.
Abouleish, Amr E; Dexter, Franklin; Epstein, Richard H; Lubarsky, David A; Whitten, Charles W; Prough, Donald S
2003-04-01
Determination of operating room (OR) block allocation and case scheduling is often not based on maximizing OR efficiency, but rather on tradition and surgeon convenience. As a result, anesthesiology groups often incur additional labor costs. When negotiating financial support, heads of anesthesiology departments are often challenged to justify the subsidy necessary to offset these additional labor costs. In this study, we describe a method for calculating a statistically sound estimate of the excess labor costs incurred by an anesthesiology group because of inefficient OR allocation and case scheduling. OR information system and anesthesia staffing data for 1 yr were obtained from two university hospitals. Optimal OR allocation for each surgical service was determined by maximizing the efficiency of use of the OR staff. Hourly costs were converted to dollar amounts by using the nationwide median compensation for academic and private-practice anesthesia providers. Differences between actual costs and the optimal OR allocation were determined. For Hospital A, estimated annual excess labor costs were $1.6 million (95% confidence interval, $1.5-$1.7 million) and $2.0 million ($1.89-$2.05 million) when academic and private-practice compensation, respectively, was calculated. For Hospital B, excess labor costs were $1.0 million ($1.08-$1.17 million) and $1.4 million ($1.32-1.43 million) for academic and private-practice compensation, respectively. This study demonstrates a methodology for an anesthesiology group to estimate its excess labor costs. The group can then use these estimates when negotiating for subsidies with its hospital, medical school, or multispecialty medical group. We describe a new application for a previously reported statistical method to calculate operating room (OR) allocations to maximize OR efficiency. When optimal OR allocations and case scheduling are not implemented, the resulting increase in labor costs can be used in negotiations as a statistically sound estimate for the increased labor cost to the anesthesiology department.
Mashey, Thomas Charles
2002-01-01
A fabricated torque shaft is provided that features a bolt-together design to allow vane schedule revisions with minimal hardware cost. The bolt-together design further facilitates on-site vane schedule revisions with parts that are comparatively small. The fabricated torque shaft also accommodates stage schedules that are different one from another in non-linear inter-relationships as well as non-linear schedules for a particular stage of vanes.
Determination of an Optimal Commercial Data Bus Architecture for a Flight Data System
NASA Technical Reports Server (NTRS)
Crawford, Kevin; Johnson, Martin; Humphries, Rick (Technical Monitor)
2001-01-01
NASA/Marshall Space Flight Center (MSFC) is continually looking for methods to reduce cost and schedule while keeping the quality of work high. MSFC is NASA's lead center for space transportation and microgravity research. When supporting NASA's programs several decisions concerning the avionics system must be made. Usually many trade studies must be conducted to determine the best ways to meet the customer's requirements. When deciding the flight data system, one of the first trade studies normally conducted is the determination of the data bus architecture. The schedule, cost, reliability, and environments are some of the factors that are reviewed in the determination of the data bus architecture. Based on the studies, the data bus architecture could result in a proprietary data bus or a commercial data bus. The cost factor usually removes the proprietary data bus from consideration. The commercial data bus's range from Versa Module Eurocard (VME) to Compact PCI to STD 32 to PC 104. If cost, schedule and size are prime factors, VME is usually not considered. If the prime factors are cost, schedule, and size then Compact PCI, STD 32 and PC104 are the choices for the data bus architecture. MSFC's center director has funded a study from his discretionary fund to determine an optimal low cost commercial data bus architecture. The goal of the study is to functionally and environmentally test Compact PCI, STD 32 and PC 104 data bus architectures. This paper will summarize the results of the data bus architecture study.
Differences in Student Outcomes between Block, Semester, and Trimester Schedules.
ERIC Educational Resources Information Center
McCreary, Jason; Hausman, Charles
Despite the popularity of schedule modifications as a cost-effective reform to improve student outcomes, little empirical research on the consequences of alternative schedules has been conducted. The literature has been dominated by anecdotal reports. Even when empirical evidence is examined, causal comparisons of school outcomes between schedules…
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Schedule of charges. 7.4 Section 7.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS DISTRIBUTION OF..., depending upon the cost of ingredients and the complexity of production. An up-to-date schedule of charges...
Working Hours Flexibility. Background Paper No. 30.
ERIC Educational Resources Information Center
Staines, Graham L.
Flexible work schedules offer the promise of a low-cost option for helping people manage work and family responsibilities. Alternative work schedules include part-time work, job sharing, work sharing, shiftwork, compressed work week, flexitime, and flexiplace. Flexitime is the most prevalent full-time flexible schedule and is second in prevalence…
Management Matters. Changing to Flexible Scheduling
ERIC Educational Resources Information Center
Pappas, Marjorie L.
2005-01-01
Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…
Naval Postgraduate School Solar Cell Array Tester
2010-12-01
PROGRAM MANAGEMENT ................................45 1. SCHEDULE .....................................47 B. BUDGET...budget and schedule from December 2009 to September 2010. In addition, a total development cost estimate, including labor, equipment, and testing... scheduler becomes active, all tasks become eligible to run, and normal operations begin. Figure 21 shows a diagram of the startup actions [32
Wave scheduling - Decentralized scheduling of task forces in multicomputers
NASA Technical Reports Server (NTRS)
Van Tilborg, A. M.; Wittie, L. D.
1984-01-01
Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.
The cost of doing business: cost structure of electronic immunization registries.
Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy
2002-10-01
To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment.
1997-09-01
Daly chose five models (REVIC, PRICE-S, SEER, System-4, and SPQR /20) to estimate schedule for 21 separate projects from the Electronic System Division...PRICE-S, two variants of COCOMO, System-3, SPQR /20, SASET, SoftCost-Ada) to 11 eight Ada specific programs. Ada was specifically designed for and is
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
NASA Astrophysics Data System (ADS)
Pattabhiraman, Sriram
Airplane fuselage structures are designed with the concept of damage tolerance, wherein small damage are allowed to remain on the airplane, and damage that otherwise affect the safety of the structure are repaired. The damage critical to the safety of the fuselage are repaired by scheduling maintenance at pre-determined intervals. Scheduling maintenance is an interesting trade-off between damage tolerance and cost. Tolerance of larger damage would require less frequent maintenance and hence, a lower cost, to maintain a certain level of reliability. Alternatively, condition-based maintenance techniques have been developed using on-board sensors, which track damage continuously and request maintenance only when the damage size crosses a particular threshold. This effects a tolerance of larger damage than scheduled maintenance, leading to savings in cost. This work quantifies the savings of condition-based maintenance over scheduled maintenance. The work also quantifies converting the cost savings into weight savings. Structural health monitoring will need time to be able to establish itself as a stand-alone system for maintenance, due to concerns on its diagnosis accuracy and reliability. This work also investigates the effect of synchronizing structural health monitoring system with scheduled maintenance. This work uses on-board SHM equipment skip structural airframe maintenance (a subsect of scheduled maintenance), whenever deemed unnecessary while maintain a desired level of safety of structure. The work will also predict the necessary maintenance for a fleet of airplanes, based on the current damage status of the airplanes. The work also analyses the possibility of false alarm, wherein maintenance is being requested with no critical damage on the airplane. The work use SHM as a tool to identify lemons in a fleet of airplanes. Lemons are those airplanes that would warrant more maintenance trips than the average behavior of the fleet.
NASA Technical Reports Server (NTRS)
Cole, Stuart K.; Wallace, Jon; Schaffer, Mark; May, M. Scott; Greenberg, Marc W.
2014-01-01
As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.
29 CFR 4901.32 - Fee schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... an established agency-wide average rate for CPU operating costs and operator/programmer salaries... of duplication. (c) Other charges. The scheduled fees, set forth in paragraphs (a) and (b) of this...
29 CFR 4901.32 - Fee schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... an established agency-wide average rate for CPU operating costs and operator/programmer salaries... of duplication. (c) Other charges. The scheduled fees, set forth in paragraphs (a) and (b) of this...
Time-optimum packet scheduling for many-to-one routing in wireless sensor networks
Song, W.-Z.; Yuan, F.; LaHuser, R.
2007-01-01
This paper studies the WSN application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs max(2N(u1) - 1, N(u 0) -1) time slots, assuming each node reports one unit of data in each round. Here N(u0) is the total number of sensors, while N(u 1) denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also eliminated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle. ??2006 IEEE.
Time-optimum packet scheduling for many-to-one routing in wireless sensor networks
Song, W.-Z.; Yuan, F.; LaHusen, R.; Shirazi, B.
2007-01-01
This paper studies the wireless sensor networks (WSN) application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs [image omitted], N(u0)-1) time slots, assuming each node reports one unit of data in each round. Here [image omitted] is the total number of sensors, while [image omitted] denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet-scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also mitigated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle.
User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program
Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions
2012-01-01
This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...
Value of information of repair times for offshore wind farm maintenance planning
NASA Astrophysics Data System (ADS)
Seyr, Helene; Muskulus, Michael
2016-09-01
A large contribution to the total cost of energy in offshore wind farms is due to maintenance costs. In recent years research has focused therefore on lowering the maintenance costs using different approaches. Decision support models for scheduling the maintenance exist already, dealing with different factors influencing the scheduling. Our contribution deals with the uncertainty in the repair times. Given the mean repair times for different turbine components we make some assumptions regarding the underlying repair time distribution. We compare the results of a decision support model for the mean times to repair and those repair time distributions. Additionally, distributions with the same mean but different variances are compared under the same conditions. The value of lowering the uncertainty in the repair time is calculated and we find that using distributions significantly decreases the availability, when scheduling maintenance for multiple turbines in a wind park. Having detailed information about the repair time distribution may influence the results of maintenance modeling and might help identify cost factors.
The economic and operational value of using drones to transport vaccines.
Haidari, Leila A; Brown, Shawn T; Ferguson, Marie; Bancroft, Emily; Spiker, Marie; Wilcox, Allen; Ambikapathi, Ramya; Sampath, Vidya; Connor, Diana L; Lee, Bruce Y
2016-07-25
Immunization programs in low and middle income countries (LMICs) face numerous challenges in getting life-saving vaccines to the people who need them. As unmanned aerial vehicle (UAV) technology has progressed in recent years, potential use cases for UAVs have proliferated due to their ability to traverse difficult terrains, reduce labor, and replace fleets of vehicles that require costly maintenance. Using a HERMES-generated simulation model, we performed sensitivity analyses to assess the impact of using an unmanned aerial system (UAS) for routine vaccine distribution under a range of circumstances reflecting variations in geography, population, road conditions, and vaccine schedules. We also identified the UAV payload and UAS costs necessary for a UAS to be favorable over a traditional multi-tiered land transport system (TMLTS). Implementing the UAS in the baseline scenario improved vaccine availability (96% versus 94%) and produced logistics cost savings of $0.08 per dose administered as compared to the TMLTS. The UAS maintained cost savings in all sensitivity analyses, ranging from $0.05 to $0.21 per dose administered. The minimum UAV payloads necessary to achieve cost savings over the TMLTS, for the various vaccine schedules and UAS costs and lifetimes tested, were substantially smaller (up to 0.40L) than the currently assumed UAV payload of 1.5L. Similarly, the maximum UAS costs that could achieve savings over the TMLTS were greater than the currently assumed costs under realistic flight conditions. Implementing a UAS could increase vaccine availability and decrease costs in a wide range of settings and circumstances if the drones are used frequently enough to overcome the capital costs of installing and maintaining the system. Our computational model showed that major drivers of costs savings from using UAS are road speed of traditional land vehicles, the number of people needing to be vaccinated, and the distance that needs to be traveled. Copyright © 2016. Published by Elsevier Ltd.
The economic and operational value of using drones to transport vaccines
Haidari, Leila A.; Brown, Shawn T.; Ferguson, Marie; Bancroft, Emily; Spiker, Marie; Wilcox, Allen; Ambikapathi, Ramya; Sampath, Vidya; Connor, Diana L.; Lee, Bruce Y.
2017-01-01
Background Immunization programs in low and middle income countries (LMICs) face numerous challenges in getting life-saving vaccines to the people who need them. As unmanned aerial vehicle (UAV) technology has progressed in recent years, potential use cases for UAVs have proliferated due to their ability to traverse difficult terrains, reduce labor, and replace fleets of vehicles that require costly maintenance. Methods Using a HERMES-generated simulation model, we performed sensitivity analyses to assess the impact of using an unmanned aerial system (UAS) for routine vaccine distribution under a range of circumstances reflecting variations in geography, population, road conditions, and vaccine schedules. We also identified the UAV payload and UAS costs necessary for a UAS to be favorable over a traditional multi-tiered land transport system (TMLTS). Results Implementing the UAS in the baseline scenario improved vaccine availability (96% versus 94%) and produced logistics cost savings of $0.08 per dose administered as compared to the TMLTS. The UAS maintained cost savings in all sensitivity analyses, ranging from $0.05 to $0.21 per dose administered. The minimum UAV payloads necessary to achieve cost savings over the TMLTS, for the various vaccine schedules and UAS costs and lifetimes tested, were substantially smaller (up to 0.40 L) than the currently assumed UAV payload of 1.5 L. Similarly, the maximum UAS costs that could achieve savings over the TMLTS were greater than the currently assumed costs under realistic flight conditions. Conclusion Implementing a UAS could increase vaccine availability and decrease costs in a wide range of settings and circumstances if the drones are used frequently enough to overcome the capital costs of installing and maintaining the system. Our computational model showed that major drivers of costs savings from using UAS are road speed of traditional land vehicles, the number of people needing to be vaccinated, and the distance that needs to be traveled. PMID:27340098
NASA Technical Reports Server (NTRS)
1972-01-01
The results are presented of the second six-month performance period of the Nuclear Electric Propulsion Mission Engineering Study. A brief overview of the program, identifying the study objectives and approach, and a discussion of the program status and schedule are presented. The program results are reviewed and key conclusions to date are summarized. Planned effort for the remainder of the program is reviewed.
NASA Technical Reports Server (NTRS)
1983-01-01
The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.
F-35 Joint Strike Fighter: Development of New Capabilities Requires Continued Oversight
2016-04-26
Expected at 10:00 a.m. ET Tuesday, April 26, 2016 GAO-16-634T United States Government Accountability Office Letter Page 1 GAO-16-634T F-35...difficult for Congress to hold it accountable for achieving its cost, schedule, and performance requirements. Given that congressional oversight... Accountability Office, the audit, evaluation, and investigative arm of Congress, exists to support Congress in meeting its constitutional
An Analysis of Technology Transition Within the Department of Defense
2010-06-01
relentless adversaries, it is essential that the DoD performs technology transition in a practical yet expedient manner. Time is a critical factor in...themselves, rather than rely on DOD labs to do so—a practice that brings cost and schedule risk since programs may well find themselves addressing problems...that utilized non-traditional, industry practices to abate the difficulties bringing technologies to a suitable maturation state. Albeit these
ERIC Educational Resources Information Center
Powell, Christopher R.
2010-01-01
There is a disconnect between information technology (IT) and information systems (IS) that lies at the foundation of frequent failure in cost, schedule, and/or performance of IT/IS. This disconnect can perhaps be reconciled through a focus on the socially constructed and emergent nature of IT as it enters and is used by an organization. The…
Integrated Resource Planning Model (IRPM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, T. B.
2010-04-01
The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as wellmore » as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.« less
NASA Technical Reports Server (NTRS)
Larsen, D. Gail; Schwieder, Paul R.
1993-01-01
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
NASA Astrophysics Data System (ADS)
Larsen, D. Gail; Schwieder, Paul R.
1993-02-01
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
NASA Astrophysics Data System (ADS)
Larsen, D. G.; Schwieder, P. R.
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE video conferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hub monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel costs throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines
Zhang, Guang-Qian; Wang, Jian-Jun; Liu, Ya-Jing
2014-01-01
m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem. PMID:24982933
Understanding Acquisition Cycle Time: Focusing the Research Problem
2013-11-01
Browning, Tyson R., and Steven D. Eppinger. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE...2009. Clark, Kim, and Steven Wheelwright. Revolutionizing Development: Quantum Leaps in Speed, Efficiency and Quality. New York, NY: The Free Press...1992. Cross, Steven M. Data Analysis and its Impact on Predicting Schedule and Cost Risk. AFIT/GIR/ENC/06M-01. Wright-Patterson AFB OH: AFIT
Cost-effectiveness of rotavirus vaccination in peru.
Clark, Andrew D; Walker, Damian G; Mosqueira, N Rocio; Penny, Mary E; Lanata, Claudio F; Fox-Rushby, Julia; Sanderson, Colin F B
2009-11-01
There are plans to introduce the oral rotavirus vaccine Rotarix (GlaxoSmithKline), 1 of 2 recently developed vaccines against rotavirus, in Peru. We modeled the cost-effectiveness of adding a rotavirus vaccine to the Peruvian immunization program under 3 scenarios for the timing of vaccination: (1) strictly according to schedule, at 2 and 4 months of age (on time); (2) distributed around the target ages in the same way as the actual timings in the program (flexible); and (3) flexible but assuming vaccination is not initiated for infants >12 weeks of age (restricted). We assumed an introductory price of US $7.50 per dose, and varied the annual rate of price decrease in sensitivity analyses. The discounted cost per disability-adjusted life-year averted for restricted, flexible, and on-time schedules was $621, $615, and $581, respectively. For each of the 3 scenarios, the percentage reduction in deaths due to rotavirus infection was 53%, 66%, and 69%, respectively. The cost per disability-adjusted life-year averted for alternative "what-if" scenarios ranged from $229 (assuming a 1-dose schedule, administered on time) to $1491 (assuming a 2-dose schedule, with half the baseline vaccine efficacy rates and a restricted timing policy). On the basis of current World Health Organization guidelines, rotavirus vaccination represents a highly cost-effective intervention in Peru. Withholding the vaccine from children who present for their first dose after 12 weeks of age would reduce the number of deaths averted by approximately 20%. A single dose may be more cost-effective than 2 doses, but more evidence on the protection conferred by a single dose is required.
2013-03-01
33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde
A decision-making framework for total ownership cost management of complex systems: A Delphi study
NASA Astrophysics Data System (ADS)
King, Russel J.
This qualitative study, using a modified Delphi method, was conducted to develop a decision-making framework for the total ownership cost management of complex systems in the aerospace industry. The primary focus of total ownership cost is to look beyond the purchase price when evaluating complex system life cycle alternatives. A thorough literature review and the opinions of a group of qualified experts resulted in a compilation of total ownership cost best practices, cost drivers, key performance factors, applicable assessment methods, practitioner credentials and potential barriers to effective implementation. The expert panel provided responses to the study questions using a 5-point Likert-type scale. Data were analyzed and provided to the panel members for review and discussion with the intent to achieve group consensus. As a result of the study, the experts agreed that a total ownership cost analysis should (a) be as simple as possible using historical data; (b) establish cost targets, metrics, and penalties early in the program; (c) monitor the targets throughout the product lifecycle and revise them as applicable historical data becomes available; and (d) directly link total ownership cost elements with other success factors during program development. The resultant study framework provides the business leader with incentives and methods to develop and implement strategies for controlling and reducing total ownership cost over the entire product life cycle when balancing cost, schedule, and performance decisions.
Thermoelectric Outer Planets Spacecraft (TOPS)
NASA Technical Reports Server (NTRS)
1973-01-01
The research and advanced development work is reported on a ballistic-mode, outer planet spacecraft using radioisotope thermoelectric generator (RTG) power. The Thermoelectric Outer Planet Spacecraft (TOPS) project was established to provide the advanced systems technology that would allow the realistic estimates of performance, cost, reliability, and scheduling that are required for an actual flight mission. A system design of the complete RTG-powered outer planet spacecraft was made; major technical innovations of certain hardware elements were designed, developed, and tested; and reliability and quality assurance concepts were developed for long-life requirements. At the conclusion of its active phase, the TOPS Project reached its principal objectives: a development and experience base was established for project definition, and for estimating cost, performance, and reliability; an understanding of system and subsystem capabilities for successful outer planets missions was achieved. The system design answered long-life requirements with massive redundancy, controlled by on-board analysis of spacecraft performance data.
A 48Cycles/MB H.264/AVC Deblocking Filter Architecture for Ultra High Definition Applications
NASA Astrophysics Data System (ADS)
Zhou, Dajiang; Zhou, Jinjia; Zhu, Jiayi; Goto, Satoshi
In this paper, a highly parallel deblocking filter architecture for H.264/AVC is proposed to process one macroblock in 48 clock cycles and give real-time support to QFHD@60fps sequences at less than 100MHz. 4 edge filters organized in 2 groups for simultaneously processing vertical and horizontal edges are applied in this architecture to enhance its throughput. While parallelism increases, pipeline hazards arise owing to the latency of edge filters and data dependency of deblocking algorithm. To solve this problem, a zig-zag processing schedule is proposed to eliminate the pipeline bubbles. Data path of the architecture is then derived according to the processing schedule and optimized through data flow merging, so as to minimize the cost of logic and internal buffer. Meanwhile, the architecture's data input rate is designed to be identical to its throughput, while the transmission order of input data can also match the zig-zag processing schedule. Therefore no intercommunication buffer is required between the deblocking filter and its previous component for speed matching or data reordering. As a result, only one 24×64 two-port SRAM as internal buffer is required in this design. When synthesized with SMIC 130nm process, the architecture costs a gate count of 30.2k, which is competitive considering its high performance.
Scheduling and control strategies for the departure problem in air traffic control
NASA Astrophysics Data System (ADS)
Bolender, Michael Alan
Two problems relating to the departure problem in air traffic control automation are examined. The first problem that is addressed is the scheduling of aircraft for departure. The departure operations at a major US hub airport are analyzed, and a discrete event simulation of the departure operations is constructed. Specifically, the case where there is a single departure runway is considered. The runway is fed by two queues of aircraft. Each queue, in turn, is fed by a single taxiway. Two salient areas regarding scheduling are addressed. The first is the construction of optimal departure sequences for the aircraft that are queued. Several greedy search algorithms are designed to minimize the total time to depart a set of queued aircraft. Each algorithm has a different set of heuristic rules to resolve situations within the search space whenever two branches of the search tree with equal edge costs are encountered. These algorithms are then compared and contrasted with a genetic search algorithm in order to assess the performance of the heuristics. This is done in the context of a static departure problem where the length of the departure queue is fixed. A greedy algorithm which deepens the search whenever two branches of the search tree with non-unique costs are encountered is shown to outperform the other heuristic algorithms. This search strategy is then implemented in the discrete event simulation. A baseline performance level is established, and a sensitivity analysis is performed by implementing changes in traffic mix, routing, and miles-in-trail restrictions for comparison. It is concluded that to minimize the average time spent in the queue for different traffic conditions, a queue assignment algorithm is needed to maintain an even balance of aircraft in the queues. A necessary consideration is to base queue assignment upon traffic management restrictions such as miles-in-trail constraints. The second problem addresses the technical challenges associated with merging departure aircraft onto their filed routes in a congested airspace environment. Conflicts between departures and en route aircraft within the Center airspace are analyzed. Speed control, holding the aircraft; at an intermediate altitude, re-routing, and vectoring are posed as possible deconfliction maneuvers. A cost assessment of these merge strategies, which are based upon 4D fight management and conflict detection and resolution principles, is given. Several merge conflicts are studied and a cost for each resolution is computed. It is shown that vectoring tends to be the most expensive resolution technique. Altitude hold is simple, costs less than vectoring, but may require a long time for the aircraft to achieve separation. Re-routing is the simplest, and provides the most cost benefit since the aircraft flies a shorter distance than if it had followed its filed route. Speed control is shown to be ineffective as a means of increasing separation, but is effective for maintaining separation between aircraft. In addition, the affects of uncertainties on the cost are assessed. The analysis shows that cost is invariant with the decision time.
Integrating Solar PV in Utility System Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, A.; Botterud, A.; Wu, J.
2013-10-31
This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, andmore » day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.« less
Production scheduling and rescheduling with genetic algorithms.
Bierwirth, C; Mattfeld, D C
1999-01-01
A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.
Pizzi, Laura T; Zangalli, Camila S; Murchison, Ann P; Hale, Nicole; Hark, Lisa; Dai, Yang; Leiby, Benjamin E; Haller, Julia A
2015-04-01
Diabetic retinopathy is one of the leading causes of vision impairment among adults in the USA. While it is suggested that diabetics receive annual dilated fundus examinations (DFE), many patients do not adhere to these recommendations. This paper investigates the outcomes and costs of an educational and telephone intervention on DFE follow-up adherence in patients with diabetes. In a prospective trial, 356 diabetic patients due for a DFE at an urban eye clinic were randomly assigned to usual care (UC; reference case), mailed intervention (MI), or telephone intervention (TI). UC patients (n = 119) received a standard form letter. MI patients (n = 117) received a personalized letter encouraging scheduling of an eye examination with an educational brochure about diabetic eye disease. TI patients (n = 120) received personal calls (up to three attempts) to schedule a follow-up with standard form letter. The primary outcome was obtaining a DFE within 90 days of suggested return. Costs (US$ 2013) included time costs for staff, phone charges, supplies, and postage. Since TI involved greater cost components compared to MI, univariate sensitivity analysis examined the impact of reducing phone costs. Patients were mostly female (66 %) and African American (70 %) with a mean age of 61 years. TI patients were more likely to schedule DFE [65 vs. 42 %; relative risk (RR) 1.54; CI 1.20-1.96; P < 0.001] versus UC patients. Obtaining a DFE within 90 days of suggested return was also significantly higher among TI patients compared to UC patients (51 vs. 36 %, RR 1.41; CI 1.05-1.89; P = 0.024). MI patients were slightly less likely to schedule DFE versus UC patients (38 vs. 42 %, RR 0.90; CI 0.66-1.22; P = NSS) and obtain a DFE (32 vs. 36 %; RR 0.90; CI 0.63-1.28; P = NSS). The total cost of TI was US$798.28 or US$6.65/patient and the cost/follow-up DFE was US$26.05. Sensitivity analyses revealed that the cost/follow-up can be greatly reduced but remains greater compared to UC (US$2.76 if US$0.25/call, US$11.13 if $1/call; US$22.29 if US$2/call). Personal phone assistance in scheduling DFE follow-up is more effective but also more costly. Follow-up research has been initiated to determine whether automated phone reminders can achieve similar effectiveness at a lower cost.
EELV Booster Assist Options for CEV
NASA Technical Reports Server (NTRS)
McNeal, Curtis, Jr.
2005-01-01
Medium lift EELVs may still play a role in manned space flight. To be considered for manned flight, medium lift EELVs must address the short comings in their current boost assist motors. Two options exist: redesign and requalify the solid rocket motors. Replace solid rocket motors (SRMs) with hybrid rocket motors. Hybrid rocket motors are an attractive alternative. They are safer than SRMs. The TRL's Lockheed Martin Small Launch Vehicle booster development substantially lowers the development risk, cost risk, and the schedule risk for developing hybrid boost assist for EELVs. Hybrid boosters testability offsets SRMs higher inherent reliability.Hybrid booster development and recurring costs are lower than SRMs. Performance gains are readily achieved.
Integration of safety engineering into a cost optimized development program.
NASA Technical Reports Server (NTRS)
Ball, L. W.
1972-01-01
A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'
Ciarametaro, Mike; Bradshaw, Steven E.; Guiglotto, Jillian; Hahn, Beth; Meier, Genevieve
2015-01-01
Abstract The objective of this work is to demonstrate the potential time and labor savings that may result from increased use of combination vaccinations. The study (GSK study identifier: HO-12-4735) was a model developed to evaluate the efficiency of the pediatric vaccine schedule, using time and motion studies. The model considered vaccination time and the associated labor costs, but vaccination acquisition costs were not considered. We also did not consider any efficacy or safety differences between formulations. The model inputs were supported by a targeted literature review. The reference year for the model was 2012. The most efficient vaccination program using currently available vaccines was predicted to reduce costs through a combination of fewer injections (62%) and less time per vaccination (38%). The most versus the least efficient vaccine program was predicted to result in a 47% reduction in vaccination time and a 42% reduction in labor and supply costs. The estimated administration cost saving with the most versus the least efficient program was estimated to be nearly US $45 million. If hypothetical 6- or 7-valent vaccines are developed using the already most efficient schedule by adding additional antigens (pneumococcal conjugate vaccine and Haemophilus influenzae type b) to the most efficient 5-valent vaccine, the savings are predicted to be even greater. Combination vaccinations reduce the time burden of the childhood immunization schedule and could create the potential to improve vaccination uptake and compliance as a result of fewer required injections. PMID:25634165
Association of sleep and academic performance.
Eliasson, Arne; Eliasson, Anders; King, Joseph; Gould, Ben; Eliasson, Arn
2002-03-01
Poor school performance by adolescent students has been attributed in part to insufficient sleep. It is recognized that a number of factors lead to diminished total sleep time and chief among these are early school start times and sleep phase delay in adolescence. Political initiatives are gaining momentum across the United States to require later school start times with the intent of increasing total sleep time and consequently improving school performance. Later school start times come with significant costs and impact other activities of families and communities. The decision to implement later school start times cannot be made lightly and deserves support of well-performed research on the impact of these changes. A study evaluating the association of academic performance and total sleep time was performed in middle school and high school students in a suburban Maryland school system. Preliminary results of this study show no correlation of total sleep time with academic performance. Before mandating costly changes in school schedules, it would be useful to perform further research to determine the effects of increasing sleep time on the behaviors of adolescent students.
National Space Transportation System (NSTS) technology needs
NASA Technical Reports Server (NTRS)
Winterhalter, David L.; Ulrich, Kimberly K.
1990-01-01
The National Space Transportation System (NSTS) is one of the Nation's most valuable resources, providing manned transportation to and from space in support of payloads and scientific research. The NSTS program is currently faced with the problem of hardware obsolescence, which could result in unacceptable schedule and cost impacts to the flight program. Obsolescence problems occur because certain components are no longer being manufactured or repair turnaround time is excessive. In order to achieve a long-term, reliable transportation system that can support manned access to space through 2010 and beyond, NASA must develop a strategic plan for a phased implementation of enhancements which will satisfy this long-term goal. The NSTS program has initiated the Assured Shuttle Availability (ASA) project with the following objectives: eliminate hardware obsolescence in critical areas, increase reliability and safety of the vehicle, decrease operational costs and turnaround time, and improve operational capability. The strategy for ASA will be to first meet the mandatory needs - keep the Shuttle flying. Non-mandatory changes that will improve operational capability and enhance performance will then be considered if funding is adequate. Upgrade packages should be developed to install within designated inspection periods, grouped in a systematic approach to reduce cost and schedule impacts, and allow the capability to provide a Block 2 Shuttle (Phase 3).
Cost-effectiveness of strategies to enhance mammography use.
Fishman, P; Taplin, S; Meyer, D; Barlow, W
2000-01-01
To estimate the cost-effectiveness of three strategies to increase breast cancer screening with mammography (reminder postcard, reminder telephone call, and motivational telephone call). Cost accounting for each strategy followed by cost-effectiveness analysis. DATA SOURCE FOR EFFECTIVENESS: Randomized trial of three strategies conducted at Group Health Cooperative of Puget Sound (GHC). Women 50 to 79 years of age who were enrolled in GHC's breast cancer screening program who did not schedule screening mammography within 2 months after it was recommended by letter. Health plan. Marginal cost-effectiveness of each additional woman screened. Because of its high cost (about $26 per call) and intermediate effectiveness, the motivational call was the least cost-effective strategy. If it was assumed that 50% of the women who scheduled mammography after receiving the reminder postcard would have scheduled mammography within 10 months even without it, marginal cost-effectiveness for the postcard among all women was $22 per woman screened versus $92 for the reminder call. Among women with no previous mammography, the marginal cost-effectiveness for the postcard was $70 versus $100 for the reminder call. Among women with no previous mammography, the choice between the reminder postcard and the reminder call was sensitive to assumptions about the percentage of women expected to receive mammography in the absence of other promotional strategies. A simple reminder postcard is the most cost-effective way to increase mammography. Choices about how to promote mammography will ultimately depend on plan values and willingness to invest in promotional strategies that increase participation at higher unit costs.
29 CFR 20.59 - Assessment of administrative costs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... against other debtors in similar stages of delinquency. (b) In addition to assessing the costs listed in... delinquency. (c) The Chief Financial Officer shall issue each year a schedule providing the costs associated...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marathe, Aniruddha P.; Harris, Rachel A.; Lowenthal, David K.
The use of clouds to execute high-performance computing (HPC) applications has greatly increased recently. Clouds provide several potential advantages over traditional supercomputers and in-house clusters. The most popular cloud is currently Amazon EC2, which provides fixed-cost and variable-cost, auction-based options. The auction market trades lower cost for potential interruptions that necessitate checkpointing; if the market price exceeds the bid price, a node is taken away from the user without warning. We explore techniques to maximize performance per dollar given a time constraint within which an application must complete. Specifically, we design and implement multiple techniques to reduce expected cost bymore » exploiting redundancy in the EC2 auction market. We then design an adaptive algorithm that selects a scheduling algorithm and determines the bid price. We show that our adaptive algorithm executes programs up to seven times cheaper than using the on-demand market and up to 44 percent cheaper than the best non-redundant, auction-market algorithm. We extend our adaptive algorithm to incorporate application scalability characteristics for further cost savings. In conclusion, we show that the adaptive algorithm informed with scalability characteristics of applications achieves up to 56 percent cost savings compared to the expected cost for the base adaptive algorithm run at a fixed, user-defined scale.« less
Liu, Weihua; Yang, Yi; Wang, Shuqing; Liu, Yang
2014-01-01
Order insertion often occurs in the scheduling process of logistics service supply chain (LSSC), which disturbs normal time scheduling especially in the environment of mass customization logistics service. This study analyses order similarity coefficient and order insertion operation process and then establishes an order insertion scheduling model of LSSC with service capacity and time factors considered. This model aims to minimize the average unit volume operation cost of logistics service integrator and maximize the average satisfaction degree of functional logistics service providers. In order to verify the viability and effectiveness of our model, a specific example is numerically analyzed. Some interesting conclusions are obtained. First, along with the increase of completion time delay coefficient permitted by customers, the possible inserting order volume first increases and then trends to be stable. Second, supply chain performance reaches the best when the volume of inserting order is equal to the surplus volume of the normal operation capacity in mass service process. Third, the larger the normal operation capacity in mass service process is, the bigger the possible inserting order's volume will be. Moreover, compared to increasing the completion time delay coefficient, improving the normal operation capacity of mass service process is more useful.
Lu, Lingbo; Li, Jingshan; Gisler, Paula
2011-06-01
Radiology tests, such as MRI, CT-scan, X-ray and ultrasound, are cost intensive and insurance pre-approvals are necessary to get reimbursement. In some cases, tests may be denied for payments by insurance companies due to lack of pre-approvals, inaccurate or missing necessary information. This can lead to substantial revenue losses for the hospital. In this paper, we present a simulation study of a centralized scheduling process for outpatient radiology tests at a large community hospital (Central Baptist Hospital in Lexington, Kentucky). Based on analysis of the central scheduling process, a simulation model of information flow in the process has been developed. Using such a model, the root causes of financial losses associated with errors and omissions in this process were identified and analyzed, and their impacts were quantified. In addition, "what-if" analysis was conducted to identify potential process improvement strategies in the form of recommendations to the hospital leadership. Such a model provides a quantitative tool for continuous improvement and process control in radiology outpatient test scheduling process to reduce financial losses associated with process error. This method of analysis is also applicable to other departments in the hospital.
Preliminary design report for OTEC stationkeeping subsystems (SKSS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-12
Lockheed Ocean Systems with IMODCO prepared these preliminary designs for OTEC Stationkeeping Subsystems (SKSS) under contract to NOAA in support of the Department of Energy OTEC program. The results of Tasks III, V, and VI are presented in this design report. The report consists of five sections: introduction, preliminary designs for the multiple anchor leg (MAL) and tension anchor leg (TAL), costs and schedule, and conclusions. Extensive appendixes provide detailed descriptions of design methodology and include backup calculations and data to support the results presented. The objective of this effort is to complete the preliminary designs for the barge-MAL andmore » Spar-TAL SKSS. A set of drawings is provided for each which show arrangements, configuration, component details, engineering description, and deployment plan. Loads analysis, performance assessment, and sensitivity to requirements are presented, together with the methodology employed to analyze the systems and to derive the results presented. Life cycle costs and schedule are prepared and compared on a common basis. Finally, recommendations for the Commercial Plant SKSS are presented for both platform types.« less
NASA Technical Reports Server (NTRS)
Carter, John; Kelly, John; Jones, Dan; Lee, James
2013-01-01
There is a national effort to expedite advanced space technologies on new space systems for both government and commercial applications. In order to lower risk, these technologies should be demonstrated in a relevant environment before being installed in new space systems. This presentation introduces several low cost, short schedule space technology demonstrations using airborne and range facilities available at the Dryden Flight Research Center.
The costs of reducing loss to follow-up in South African cervical cancer screening
Goldhaber-Fiebert, Jeremy D; Denny, Lynette E; De Souza, Michelle; Wright, Thomas C; Kuhn, Louise; Goldie, Sue J
2005-01-01
Background This study was designed to quantify the resources used in reestablishing contact with women who missed their scheduled cervical cancer screening visits and to assess the success of this effort in reducing loss to follow-up in a developing country setting. Methods Women were enrolled in this Cape Town, South Africa-based screening study between 2000 and 2003, and all had scheduled follow-up visits in 2003. Community health worker (CHW) time, vehicle use, maintenance, and depreciation were estimated from weekly logs and cost accounting systems. The percentage of women who attended their scheduled visit, those who attended after CHW contact(s), and those who never returned despite attempted contact(s) were determined. The number of CHW visits per woman was also estimated. Results 3,711 visits were scheduled in 2003. Of these, 2,321 (62.5%) occurred without CHW contact, 918 (24.8%) occurred after contact(s), and 472 (12.7%) did not occur despite contact(s). Loss to follow-up was reduced from 21% to 6%, 39% to 10%, and 50% to 24% for 6, 12, and 24-month visits. CHWs attempted 3,200 contacts in 530 trips. On average, 3 CHWs attempted to contact 6 participants over each 111 minute trip. The per-person cost (2003 Rand) for these activities was 12.75, 24.92, and 40.50 for 6, 12, and 24-month visits. Conclusion CHW contact with women who missed scheduled visits increased their return rate. Cost-effectiveness analyses aimed at policy decisions about cervical cancer screening in developing countries should incorporate these findings. PMID:16288646
Historical Mass, Power, Schedule, and Cost Growth for NASA Spacecraft
NASA Technical Reports Server (NTRS)
Hayhurst, Marc R.; Bitten, Robert E.; Shinn, Stephen A.; Judnick, Daniel C.; Hallgrimson, Ingrid E.; Youngs, Megan A.
2016-01-01
Although spacecraft developers have been moving towards standardized product lines as the aerospace industry has matured, NASA's continual need to push the cutting edge of science to accomplish unique, challenging missions can still lead to spacecraft resource growth over time. This paper assesses historical mass, power, cost, and schedule growth for multiple NASA spacecraft from the last twenty years and compares to industry reserve guidelines to understand where the guidelines may fall short. Growth is assessed from project start to launch, from the time of the preliminary design review (PDR) to launch and from the time of the critical design review (CDR) to launch. Data is also assessed not just at the spacecraft bus level, but also at the subsystem level wherever possible, to help obtain further insight into possible drivers of growth. Potential recommendations to minimize spacecraft mass, power, cost, and schedule growth for future missions are also discussed.
17 CFR Schedule A to Part 286 - Schedule A to Part 286
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Insofar as practicable, the itemization shall include transfer agents' fees, cost of printing and engraving, and legal and accounting fees. The information may be given as subject to future contingencies...
Implementation and Evaluation of Self-Scheduling in a Hospital System.
Wright, Christina; McCartt, Peggy; Raines, Diane; Oermann, Marilyn H
Inflexible work schedules affect job satisfaction and influence nurse turnover. Job satisfaction is a significant predictor of nurse retention. Acute care hospitals report that job satisfaction is influenced by autonomy and educational opportunity. This project discusses implementation of computer-based self-scheduling in a hospital system and its impact. It is important for staff development educators to be aware that self-scheduling may play a key role in autonomy, professional development, turnover, and hospital costs.
Kosmadopoulos, Anastasi; Sargent, Charli; Darwent, David; Zhou, Xuan; Dawson, Drew; Roach, Gregory D
2014-12-01
Extended wakefulness, sleep loss, and circadian misalignment are factors associated with an increased accident risk in shiftwork. Splitting shifts into multiple shorter periods per day may mitigate these risks by alleviating prior wake. However, the effect of splitting the sleep-wake schedule on the homeostatic and circadian contributions to neurobehavioural performance and subjective assessments of one's ability to perform are not known. Twenty-nine male participants lived in a time isolation laboratory for 13 d, assigned to one of two 28-h forced desynchrony (FD) schedules. Depending on the assigned schedule, participants were provided the same total time in bed (TIB) each FD cycle, either consolidated into a single period (9.33 h TIB) or split into two equal halves (2 × 4.67 h TIB). Neurobehavioural performance was regularly assessed with a psychomotor vigilance task (PVT) and subjectively-assessed ability was measured with a prediction of performance on a visual analogue scale. Polysomnography was used to assess sleep, and core body temperature was recorded to assess circadian phase. On average, participants obtained the same amount of sleep in both schedules, but those in the split schedule obtained more slow wave sleep (SWS) on FD days. Mixed-effects ANOVAs indicated no overall difference between the standard and split schedules in neurobehavioural performance or predictions of performance. Main effects of circadian phase and prior wake were present for both schedules, such that performance and subjective ratings of ability were best around the circadian acrophase, worst around the nadir, and declined with increasing prior wake. There was a schedule by circadian phase interaction for all neurobehavioural performance metrics such that performance was better in the split schedule than the standard schedule around the nadir. There was no such interaction for predictions of performance. Performance during the standard schedule was significantly better than the split schedule at 2 h of prior wake, but declined at a steeper rate such that the schedules converged by 4.5-7 h of prior wake. Overall, the results indicate that when the total opportunity for sleep per day is satisfactory, a split sleep-wake schedule is not detrimental to sleep or performance. Indeed, though not reflected in subjective assessments of performance capacity, splitting the schedule may be of some benefit, given its reduction of neurobehavioural impairment at night and its association with increased SWS. Therefore, for some industries that require operations to be sustained around the clock, implementing a split work-rest schedule may be of assistance.
OTEC modular experiment cold water pipe concept evaluation. Volume III. Appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-04-01
The Cold Water Pipe System Design Study was undertaken to evaluate the diverse CWP concepts, recommend the most viable alternatives for a 1984 deployment of the 10 to 40 MWe MEP, and carry out preliminary designs of three concepts. The concept evaluation phase reported involved a systems analysis of design alternatives in the broad categories of rigid walled (with hinges), compliant walled, stockade and bottom mounted buoyant. Quantitative evaluations were made of concept performance, availability, deployment schedule, technical feasibility and cost. CWP concepts were analyzed to determine if they met or could be made to meet established system requirements andmore » could be deployed by 1984. Fabrication, construction and installation plans were developed for successful concepts, and costs were determined in a WBS format. Evaluations were performed on the basis of technical and cost risk. This volume includes the following appendices: (A) materials and associated design criteria; (B) summary of results of dynamic flow and transportation analysis; (C) CWP sizing analysis; (D) CWP thermal performance; and (E) investigation of the APL/ABAM CWP design. (WHK)« less
The Budget of the United States Government. Department of Defense Extract for Fiscal Year 1985
1984-02-01
with real GNP rising over 6% and industrial production by 16%. Unemployment, though still unacceptably high , has declined by a record 2l/z...the administration will focus its legislative effort on three of those proposals, in modified form: cost-of-living adjustment (COLA) reform, a high 5...computer matching, adjusted payment schedules, contractor and grantee performance incentives, and a streamlined field structure. All of these efforts
2014-06-01
Incentivized. The basic report card of a tra- ditional PM depends on management of cost and schedule deadlines, performance of the system and mitigation...from iTunes (iPad only). Document Viewer iBlueprint—With iBlueprint, you can create and export custom floor plans. It’s handy for homebuyers and real...create and manage punch list items, access contact data, share and store project photos, log time card entries and more. The Procore app can be used on
1981-03-01
application. This was accomplished by the collection and survey of informa- tion regarding the three positions to be studied in this thesis. The...modestly, expand the scope of collective bargaining, including covering many statutory appeals by the negotiated grievance procedure. Employees will have...current inventory of budget plans and program schedules; c. Budget formulation, review and execution; d. Collection of obligation, expenditure, cost, and
REMR (Repair, Evaluation, Maintenance, and Rehabilitation) Research Program Development Report.
1983-02-01
that can halt fur- ther damage. Cases where rock reinforcement has been used to limit dis- tress will be evaluated to examine the effectiveness of the...Corps to perform its REMR activities in a rapid, quality- oriented, and cost- effective manner. b. Increase the service life of all Civil Works projects...environmental effects of REMR and development of an operations management system to provide guidance on scheduling REMR activities. REMR Terminology The
Warranties for Weapons: Theory and Initial Assessment.
1987-04-01
the warranty on the C-17 air vehicle.2 This warranty calls for the field measurement of some five maintainability parameters, redesign and retrofit of...NOTE N-2479-AF Warranties for Weapons: Theory and Initial Assessment James P. Stucker, Giles K. Smith April 1987 Prepared for The United States Air Force...cost, schedule, performance, and reliability? The Air Force and the other Services currently are spending a lot of money and effort specifying
An Assessment of the Armed Forces of the Philippines Modernization Program
2007-12-14
Sayaff Group BAC Bids and Awards Committee BCDA Bases Conversion and Development Authority BEP Bid Evaluation Plan BIR Bureau of Internal Revenue...contractor execute the requirements of the contract with regard to cost, schedule and performance (Sammet and Green 1990, 136) Bid Evaluation Plan or BEP is...adopted in the evaluation and assessment of bidders’ statements and the method and criteria for the evaluation and assessment of bids. The BEP also
Navy Acquisition: Cost, Schedule, and Performance of New Submarine Combat Systems
1990-01-01
1985). Page 8 GAO/NSIAD-90-72 Submarine Combat Systems Chapter 1 Introduction In December 1983 the Navy awarded the International Business Machines...contracts to the General Electric Com- pany and the International Business Machines. In December 1987 the Navy selected General Electric as the prime...contractor and International Business Machines as the "follower" contractor. On March 31, 1988. the Navy awarded General Electric a $1.84 billion fixed
Computational Process Modeling for Additive Manufacturing (OSU)
NASA Technical Reports Server (NTRS)
Bagg, Stacey; Zhang, Wei
2015-01-01
Powder-Bed Additive Manufacturing (AM) through Direct Metal Laser Sintering (DMLS) or Selective Laser Melting (SLM) is being used by NASA and the Aerospace industry to "print" parts that traditionally are very complex, high cost, or long schedule lead items. The process spreads a thin layer of metal powder over a build platform, then melts the powder in a series of welds in a desired shape. The next layer of powder is applied, and the process is repeated until layer-by-layer, a very complex part can be built. This reduces cost and schedule by eliminating very complex tooling and processes traditionally used in aerospace component manufacturing. To use the process to print end-use items, NASA seeks to understand SLM material well enough to develop a method of qualifying parts for space flight operation. Traditionally, a new material process takes many years and high investment to generate statistical databases and experiential knowledge, but computational modeling can truncate the schedule and cost -many experiments can be run quickly in a model, which would take years and a high material cost to run empirically. This project seeks to optimize material build parameters with reduced time and cost through modeling.
Short, Michelle A; Centofanti, Stephanie; Hilditch, Cassie; Banks, Siobhan; Lushington, Kurt; Dorrian, Jillian
2016-05-01
Shorter, more frequent rosters, such as 6h-on/6h-off split shifts, may offer promise to sleep, subjective sleepiness and performance by limiting shift length and by offering opportunities for all workers to obtain some sleep across the biological night. However, there exists a paucity of studies that have examined these shifts using objective measures of sleep and performance. The present study examined neurobehavioural performance, sleepiness and sleep during 6h-on/6h-off split sleep schedules. Sixteen healthy adults (6 males, 26.13 y ± 4.46) participated in a 9-day laboratory study that included two baseline nights (BL, 10h time in bed (TIB), 2200 h-0800 h), 4 days on one of two types of 6h-on/6h-off split sleep schedules with 5h TIB during each 'off' period (6h early: TIB 0300 h-0800 h and 1500 h-20000 h, or 6-h late: TIB 0900 h-1400 h and 2100 h-0200 h), and two recovery nights (10h TIB per night, 2200 h-0800 h). Participants received 10h TIB per 24h in total across both shift schedules. A neurobehavioural test bout was completed every 2 h during wake, which included the Psychomotor Vigilance Task (PVT) and the Karolinska Sleepiness Scale (KSS). Linear mixed effects models were used to assess the effect of day (BL, shift days 1-4), schedule (6h early, 6h late) and trial (numbers 1-6) on PVT lapses (operationalised as the number of reaction times >500 ms), PVT total lapse time, PVT fastest 10% of reaction times and KSS. Analyses were also conducted examining the effect of day and schedule on sleep variables. Overall, PVT lapses and total lapse time did not differ significantly between baseline and shift days, however, peak response speeds were significantly slower on the first shift day when compared to baseline, but only for those in the 6h-late condition. Circadian variations were apparent in performance outcomes, with individuals in the 6h-late condition demonstrated significantly more and longer lapses and slower peak reaction times at the end of their night shift (0730 h) than at any other time during their shifts. In the 6h-early condition, only response speed significantly differed across trials, with slower response speeds occurring at trial 1 (0930 h) than in trials 3 (1330 h) or 4 (2130 h). While subjective sleepiness was higher on shift days than at baseline, sleepiness did not accumulate across days. Total sleep was reduced across split sleep schedules compared to baseline. Overall, these results show that while there was not a cumulative cost to performance across days of splitting sleep, participants obtained less sleep and reported lowered alertness on shift days. Tests near the circadian nadir showed higher sleepiness and increased performance deficits. While this schedule did not produce cumulative impairment, the performance deficits witnessed during the biological night are still of operational concern for industry and workers alike. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.
Cloud computing task scheduling strategy based on differential evolution and ant colony optimization
NASA Astrophysics Data System (ADS)
Ge, Junwei; Cai, Yu; Fang, Yiqiu
2018-05-01
This paper proposes a task scheduling strategy DEACO based on the combination of Differential Evolution (DE) and Ant Colony Optimization (ACO), aiming at the single problem of optimization objective in cloud computing task scheduling, this paper combines the shortest task completion time, cost and load balancing. DEACO uses the solution of the DE to initialize the initial pheromone of ACO, reduces the time of collecting the pheromone in ACO in the early, and improves the pheromone updating rule through the load factor. The proposed algorithm is simulated on cloudsim, and compared with the min-min and ACO. The experimental results show that DEACO is more superior in terms of time, cost, and load.
Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2
NASA Technical Reports Server (NTRS)
1981-01-01
Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.
An Efficient Scheduling Scheme on Charging Stations for Smart Transportation
NASA Astrophysics Data System (ADS)
Kim, Hye-Jin; Lee, Junghoon; Park, Gyung-Leen; Kang, Min-Jae; Kang, Mikyung
This paper proposes a reservation-based scheduling scheme for the charging station to decide the service order of multiple requests, aiming at improving the satisfiability of electric vehicles. The proposed scheme makes it possible for a customer to reduce the charge cost and waiting time, while a station can extend the number of clients it can serve. A linear rank function is defined based on estimated arrival time, waiting time bound, and the amount of needed power, reducing the scheduling complexity. Receiving the requests from the clients, the power station decides the charge order by the rank function and then replies to the requesters with the waiting time and cost it can guarantee. Each requester can decide whether to charge at that station or try another station. This scheduler can evolve to integrate a new pricing policy and services, enriching the electric vehicle transport system.
SMI Compatible Simulation Scheduler Design for Reuse of Model Complying with Smp Standard
NASA Astrophysics Data System (ADS)
Koo, Cheol-Hea; Lee, Hoon-Hee; Cheon, Yee-Jin
2010-12-01
Software reusability is one of key factors which impacts cost and schedule on a software development project. It is very crucial also in satellite simulator development since there are many commercial simulator models related to satellite and dynamics. If these models can be used in another simulator platform, great deal of confidence and cost/schedule reduction would be achieved. Simulation model portability (SMP) is maintained by European Space Agency and many models compatible with SMP/simulation model interface (SMI) are available. Korea Aerospace Research Institute (KARI) is developing hardware abstraction layer (HAL) supported satellite simulator to verify on-board software of satellite. From above reasons, KARI wants to port these SMI compatible models to the HAL supported satellite simulator. To port these SMI compatible models to the HAL supported satellite simulator, simulation scheduler is preliminary designed according to the SMI standard.
The advantages of cost plus award fee contracts
NASA Technical Reports Server (NTRS)
Keathley, William C.
1994-01-01
A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.
NASA Technical Reports Server (NTRS)
Levak, Daniel
1993-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.
The Cost of Doing Business: Cost Structure of Electronic Immunization Registries
Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy
2002-01-01
Objective To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Data Sources/Study Setting Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. Study Design A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data Collection/Extraction Methods Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. Principal Findings The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. Conclusions There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment. PMID:12479497
Tug fleet and ground operations schedules and controls. Volume 2: part 2, addenda
NASA Technical Reports Server (NTRS)
1975-01-01
The results of a study to assess the tug safing requirements at postlanding are presented. The study considered the normal (green light) conditions from orbiter landing to completion of preparations for the next launch. Normal tug ground turnaround operations include handling and transportation activities and the performance of inspections, tests, and checkout functions. These activities dictate that hazards to ground personnel, the tug, GSE, facilities, and ecology be reduced to the lowest practical level consistent with program objectives, cost, and schedules. During flight operations, the tug contains energy sources that constitute potential hazards but are required for mission accomplishment. These potential hazards have been reduced to an acceptable level for flight operation by design features and by providing for control of energy sources.
NASA Technical Reports Server (NTRS)
Logston, R. G.; Budris, G. D.
1977-01-01
The methodology to optimize the utilization of Spacelab racks and pallets and to apply this methodology to the early STS Spacelab missions was developed. A review was made of Spacelab Program requirements and flow plans, generic flow plans for racks and pallets were examined, and the principal optimization criteria and methodology were established. Interactions between schedule, inventory, and key optimization factors; schedule and cost sensitivity to optional approaches; and the development of tradeoff methodology were addressed. This methodology was then applied to early spacelab missions (1980-1982). Rack and pallet requirements and duty cycles were defined, a utilization assessment was made, and several trade studies performed involving varying degrees of Level IV integration, inventory level, and shared versus dedicated Spacelab racks and pallets.
Intelligent Life-Extending Controls for Aircraft Engines
NASA Technical Reports Server (NTRS)
Guo, Ten-Huei; Chen, Philip; Jaw, Link
2005-01-01
Aircraft engine controllers are designed and operated to provide desired performance and stability margins. The purpose of life-extending-control (LEC) is to study the relationship between control action and engine component life usage, and to design an intelligent control algorithm to provide proper trade-offs between performance and engine life usage. The benefit of this approach is that it is expected to maintain safety while minimizing the overall operating costs. With the advances of computer technology, engine operation models, and damage physics, it is necessary to reevaluate the control strategy fro overall operating cost consideration. This paper uses the thermo-mechanical fatigue (TMF) of a critical component to demonstrate how an intelligent engine control algorithm can drastically reduce the engine life usage with minimum sacrifice in performance. A Monte Carlo simulation is also performed to evaluate the likely engine damage accumulation under various operating conditions. The simulation results show that an optimized acceleration schedule can provide a significant life saving in selected engine components.
COSTMODL: An automated software development cost estimation tool
NASA Technical Reports Server (NTRS)
Roush, George B.
1991-01-01
The cost of developing computer software continues to consume an increasing portion of many organizations' total budgets, both in the public and private sector. As this trend develops, the capability to produce reliable estimates of the effort and schedule required to develop a candidate software product takes on increasing importance. The COSTMODL program was developed to provide an in-house capability to perform development cost estimates for NASA software projects. COSTMODL is an automated software development cost estimation tool which incorporates five cost estimation algorithms including the latest models for the Ada language and incrementally developed products. The principal characteristic which sets COSTMODL apart from other software cost estimation programs is its capacity to be completely customized to a particular environment. The estimation equations can be recalibrated to reflect the programmer productivity characteristics demonstrated by the user's organization, and the set of significant factors which effect software development costs can be customized to reflect any unique properties of the user's development environment. Careful use of a capability such as COSTMODL can significantly reduce the risk of cost overruns and failed projects.
Achieving reutilization of scheduling software through abstraction and generalization
NASA Technical Reports Server (NTRS)
Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael
1995-01-01
Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.
Doing more with less - The new way of exploring the solar system
NASA Technical Reports Server (NTRS)
Ridenoure, Rex
1992-01-01
Exploration of the solar system is considered in the light of existing economic factors and scientific priorities, and a general blueprint for an exploration strategy is set forth. Attention is given to mission costs, typical schedules, and the scientific findings of typical projects which create the need for collaboration and diversification in mission development. The combined technologies and cooperative efforts of several small organizations can lead to missions with short schedules and low costs.
Doing more with less - The new way of exploring the solar system
NASA Astrophysics Data System (ADS)
Ridenoure, Rex
1992-08-01
Exploration of the solar system is considered in the light of existing economic factors and scientific priorities, and a general blueprint for an exploration strategy is set forth. Attention is given to mission costs, typical schedules, and the scientific findings of typical projects which create the need for collaboration and diversification in mission development. The combined technologies and cooperative efforts of several small organizations can lead to missions with short schedules and low costs.
Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling
NASA Astrophysics Data System (ADS)
Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata
2017-10-01
Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is not allowed to take longer) and maximum total value of subcontracted work. The problem is modelled as a mixed binary linear program that minimizes project cost. It can be solved using universal solvers (e.g. LINGO, AIMMS, CPLEX, MATLAB and Optimization Toolbox, etc.). However, developing a dedicated decision-support tool would facilitate practical applications. To illustrate the idea of the model, the authors present a numerical example to find the optimal set of resources allocated to a project.
Economic Analysis Case Studies of Battery Energy Storage with SAM
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiOrio, Nicholas; Dobos, Aron; Janzou, Steven
2015-11-01
Interest in energy storage has continued to increase as states like California have introduced mandates and subsidies to spur adoption. This energy storage includes customer sited behind-the-meter storage coupled with photovoltaics (PV). This paper presents case study results from California and Tennessee, which were performed to assess the economic benefit of customer-installed systems. Different dispatch strategies, including manual scheduling and automated peak-shaving were explored to determine ideal ways to use the storage system to increase the system value and mitigate demand charges. Incentives, complex electric tariffs, and site specific load and PV data were used to perform detailed analysis. Themore » analysis was performed using the free, publically available System Advisor Model (SAM) tool. We find that installation of photovoltaics with a lithium-ion battery system priced at $300/kWh in Los Angeles under a high demand charge utility rate structure and dispatched using perfect day-ahead forecasting yields a positive net-present value, while all other scenarios cost the customer more than the savings accrued. Different dispatch strategies, including manual scheduling and automated peak-shaving were explored to determine ideal ways to use the storage system to increase the system value and mitigate demand charges. Incentives, complex electric tariffs, and site specific load and PV data were used to perform detailed analysis. The analysis was performed using the free, publically available System Advisor Model (SAM) tool. We find that installation of photovoltaics with a lithium-ion battery system priced at $300/kWh in Los Angeles under a high demand charge utility rate structure and dispatched using perfect day-ahead forecasting yields a positive net-present value, while all other scenarios cost the customer more than the savings accrued.« less
Deep space network resource scheduling approach and application
NASA Technical Reports Server (NTRS)
Eggemeyer, William C.; Bowling, Alan
1987-01-01
Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
TinyOS-based quality of service management in wireless sensor networks
Peterson, N.; Anusuya-Rangappa, L.; Shirazi, B.A.; Huang, R.; Song, W.-Z.; Miceli, M.; McBride, D.; Hurson, A.; LaHusen, R.
2009-01-01
Previously the cost and extremely limited capabilities of sensors prohibited Quality of Service (QoS) implementations in wireless sensor networks. With advances in technology, sensors are becoming significantly less expensive and the increases in computational and storage capabilities are opening the door for new, sophisticated algorithms to be implemented. Newer sensor network applications require higher data rates with more stringent priority requirements. We introduce a dynamic scheduling algorithm to improve bandwidth for high priority data in sensor networks, called Tiny-DWFQ. Our Tiny-Dynamic Weighted Fair Queuing scheduling algorithm allows for dynamic QoS for prioritized communications by continually adjusting the treatment of communication packages according to their priorities and the current level of network congestion. For performance evaluation, we tested Tiny-DWFQ, Tiny-WFQ (traditional WFQ algorithm implemented in TinyOS), and FIFO queues on an Imote2-based wireless sensor network and report their throughput and packet loss. Our results show that Tiny-DWFQ performs better in all test cases. ?? 2009 IEEE.
Collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation
NASA Astrophysics Data System (ADS)
Yang, Shangwen; Guo, Baohua; Xiao, Xuefei; Gao, Haichao
2018-01-01
To allocate the en-routes and slots to the flights with collaborative decision making, a collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation was proposed. Evaluation indexes include flight delay costs, delay time and the number of turning points. Analytic hierarchy process is applied to determining index weights. Remark set for current two flights not yet obtained the en-route and slot in flight schedule is established. Then, fuzzy comprehensive evaluation is performed, and the en-route and slot for the current two flights are determined. Continue selecting the flight not yet obtained an en-route and a slot in flight schedule. Perform fuzzy comprehensive evaluation until all flights have obtained the en-routes and slots. MatlabR2007b was applied to numerical test based on the simulated data of a civil en-route. Test results show that, compared with the traditional strategy of first come first service, the algorithm gains better effect. The effectiveness of the algorithm was verified.
75 FR 7411 - Schedule of Water Charges
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...
Residential Consumption Scheduling Based on Dynamic User Profiling
NASA Astrophysics Data System (ADS)
Mangiatordi, Federica; Pallotti, Emiliano; Del Vecchio, Paolo; Capodiferro, Licia
Deployment of household appliances and of electric vehicles raises the electricity demand in the residential areas and the impact of the building's electrical power. The variations of electricity consumption across the day, may affect both the design of the electrical generation facilities and the electricity bill, mainly when a dynamic pricing is applied. This paper focuses on an energy management system able to control the day-ahead electricity demand in a residential area, taking into account both the variability of the energy production costs and the profiling of the users. The user's behavior is dynamically profiled on the basis of the tasks performed during the previous days and of the tasks foreseen for the current day. Depending on the size and on the flexibility in time of the user tasks, home inhabitants are grouped in, one over N, energy profiles, using a k-means algorithm. For a fixed energy generation cost, each energy profile is associated to a different hourly energy cost. The goal is to identify any bad user profile and to make it pay a highest bill. A bad profile example is when a user applies a lot of consumption tasks and low flexibility in task reallocation time. The proposed energy management system automatically schedules the tasks, solving a multi-objective optimization problem based on an MPSO strategy. The goals, when identifying bad users profiles, are to reduce the peak to average ratio in energy demand, and to minimize the energy costs, promoting virtuous behaviors.
Madan, Atul K; Powelson, Jill E; Tichansky, David S
2008-01-01
We performed a formal cost analysis of a hypothetical bariatric practice consisting of a surgeon, dietitian, clinical coordinator/office manager, receptionist, and certified medical assistant to determine whether a bariatric practice would have a difficult time surviving financially with the current Medicare reimbursement. The number of possible cases was calculated for the 2005 calendar year. Most of the costs and assumptions were taken from an actual bariatric practice. The malpractice insurance premium (but not physician salary and benefits) was calculated into the practice cost. With a total of 231 days available for clinical work in 2005, 300 scheduled laparoscopic gastric bypasses could have been performed to allow for appropriate clinic time for new patient visits, postoperative visits, and annual visits. The total reimbursement from Medicare would have been $516,158, with most of the reimbursement coming from procedure fees ($407,063). The total practice cost would have been $444,592. Most of the costs were clinic staff salary and benefits ($207,065) and the malpractice premium ($55,150). The net difference of $71,566 was left to pay the salary and benefits of the bariatric surgeon. The low reimbursement of Medicare for laparoscopic gastric bypass threatens the financial viability of a bariatric surgery practice. With the increasing cost of malpractice and the threatened decrease in Medicare physician reimbursement, Medicare recipients could see a decrease in the number of bariatric surgeons offering them service.
Marathe, Aniruddha P.; Harris, Rachel A.; Lowenthal, David K.; ...
2015-12-17
The use of clouds to execute high-performance computing (HPC) applications has greatly increased recently. Clouds provide several potential advantages over traditional supercomputers and in-house clusters. The most popular cloud is currently Amazon EC2, which provides fixed-cost and variable-cost, auction-based options. The auction market trades lower cost for potential interruptions that necessitate checkpointing; if the market price exceeds the bid price, a node is taken away from the user without warning. We explore techniques to maximize performance per dollar given a time constraint within which an application must complete. Specifically, we design and implement multiple techniques to reduce expected cost bymore » exploiting redundancy in the EC2 auction market. We then design an adaptive algorithm that selects a scheduling algorithm and determines the bid price. We show that our adaptive algorithm executes programs up to seven times cheaper than using the on-demand market and up to 44 percent cheaper than the best non-redundant, auction-market algorithm. We extend our adaptive algorithm to incorporate application scalability characteristics for further cost savings. In conclusion, we show that the adaptive algorithm informed with scalability characteristics of applications achieves up to 56 percent cost savings compared to the expected cost for the base adaptive algorithm run at a fixed, user-defined scale.« less
Gerlach, Jay; Sequeira, Magda; Alvarado, Vivian; Cerpas, Christian; Balmaseda, Angel; Gonzalez, Alcides; de Los Santos, Tala; Levin, Carol E; Amador, Juan Jose; Domingo, Gonzalo J
2010-11-05
HIV viral load testing as a component of antiretroviral therapy monitoring is costly. Understanding the full costs and the major sources of inefficiency associated with viral load testing is critical for optimizing the systems and technologies that support the testing process. The objective of our study was to estimate the costs associated with viral load testing performed for antiretroviral therapy monitoring to both patients and the public healthcare system in a low-HIV prevalence, low-resource country. A detailed cost analysis was performed to understand the costs involved in each step of performing a viral load test in Nicaragua, from initial specimen collection to communication of the test results to each patient's healthcare provider. Data were compiled and cross referenced from multiple information sources: laboratory records, regional surveillance centre records, and scheduled interviews with the key healthcare providers responsible for HIV patient care in five regions of the country. The total average cost of performing a viral load test in Nicaragua varied by region, ranging from US$99.01 to US$124.58, the majority of which was at the laboratory level: $88.73 to $97.15 per specimen, depending on batch size. The average cost to clinics at which specimens were collected ranged from $3.31 to $20.92, depending on the region. The average cost per patient for transportation, food, lodging and lost income ranged from $3.70 to $14.93. The quantitative viral load test remains the single most expensive component of the process. For the patient, the distance of his or her residence from the specimen collection site is a large determinant of cost. Importantly, the efficiency of results reporting has a large impact on the cost per result delivered to the clinician and utility of the result for patient monitoring. Detailed cost analysis can identify opportunities for removing barriers to effective antiretroviral therapy monitoring programmes in limited-resource countries with low HIV prevalence.
Mautone, Susan G
2009-12-01
Sleep deprivation negatively affects resident performance, education, and safety. Concerns over these effects have prompted efforts to reduce resident hours. This article describes the design and implementation of a scheduling system with no continuous 24-hour calls. Aims included meeting Accreditation Council for Graduate Medical Education work hour requirements without increasing resident complement, maximizing continuity of learning and patient care, maintaining patient care quality, and acceptance by residents, faculty, and administration. Various coverage options were formulated and discussed. The final schedule was the product of consensus. After re-engineering the master rotation schedule, service-specific conversion of on-call schedules was initiated in July 2003 and completed in July 2004. Annual in-training and certifying examination performance, length of stay, patient mortalities, resident motor vehicle accidents/near misses, and resident satisfaction with the new scheduling system were tracked. Continuous 24-hour call has been eliminated from the program since July 2004, with the longest assigned shift being 14 hours. Residents have at least 1 free weekend per month, a 10-hour break between consecutive assigned duty hours, and a mandatory 4-hour "nap" break if assigned a night shift immediately following a day shift. Program-wide, duty hours average 66 hours per week for first-year residents, 63 hours per week for second-year residents, and 60 hours per week for third-year residents. Self-reported motor vehicle accidents and/or near misses of accidents significantly decreased (P < .001) and resident satisfaction increased (P = .42). The change was accomplished at no additional cost to the institution and with no adverse patient care or educational outcomes. Pediatric residency training with restriction to 14 consecutive duty hours is effective and well accepted by stakeholders. Five years later, the re-engineered schedule has become the new "normal" for our program.
NASA Technical Reports Server (NTRS)
Sadovsky, Alexander V.; Davis, Damek; Isaacson, Douglas R.
2012-01-01
A class of problems in air traffic management asks for a scheduling algorithm that supplies the air traffic services authority not only with a schedule of arrivals and departures, but also with speed advisories. Since advisories must be finite, a scheduling algorithm must ultimately produce a finite data set, hence must either start with a purely discrete model or involve a discretization of a continuous one. The former choice, often preferred for intuitive clarity, naturally leads to mixed-integer programs, hindering proofs of correctness and computational cost bounds (crucial for real-time operations). In this paper, a hybrid control system is used to model air traffic scheduling, capturing both the discrete and continuous aspects. This framework is applied to a class of problems, called the Fully Routed Nominal Problem. We prove a number of geometric results on feasible schedules and use these results to formulate an algorithm that attempts to compute a collective speed advisory, effectively finite, and has computational cost polynomial in the number of aircraft. This work is a first step toward optimization and models refined with more realistic detail.
Liu, Jie; Guo, Liang; Jiang, Jiping; Jiang, Dexun; Wang, Peng
2017-01-01
In the emergency management relevant to chemical contingency spills, efficiency emergency rescue can be deeply influenced by a reasonable assignment of the available emergency materials to the related risk sources. In this study, an emergency material scheduling model (EMSM) with time-effective and cost-effective objectives is developed to coordinate both allocation and scheduling of the emergency materials. Meanwhile, an improved genetic algorithm (IGA) which includes a revision operation for EMSM is proposed to identify the emergency material scheduling schemes. Then, scenario analysis is used to evaluate optimal emergency rescue scheme under different emergency pollution conditions associated with different threat degrees based on analytic hierarchy process (AHP) method. The whole framework is then applied to a computational experiment based on south-to-north water transfer project in China. The results demonstrate that the developed method not only could guarantee the implementation of the emergency rescue to satisfy the requirements of chemical contingency spills but also help decision makers identify appropriate emergency material scheduling schemes in a balance between time-effective and cost-effective objectives.
Payload accommodation and development planning tools - A Desktop Resource Leveling Model (DRLM)
NASA Technical Reports Server (NTRS)
Hilchey, John D.; Ledbetter, Bobby; Williams, Richard C.
1989-01-01
The Desktop Resource Leveling Model (DRLM) has been developed as a tool to rapidly structure and manipulate accommodation, schedule, and funding profiles for any kind of experiments, payloads, facilities, and flight systems or other project hardware. The model creates detailed databases describing 'end item' parameters, such as mass, volume, power requirements or costs and schedules for payload, subsystem, or flight system elements. It automatically spreads costs by calendar quarters and sums costs or accommodation parameters by total project, payload, facility, payload launch, or program phase. Final results can be saved or printed out, automatically documenting all assumptions, inputs, and defaults.
14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.
Code of Federal Regulations, 2012 CFR
2012-01-01
... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...
14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...
14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...
Planning and scheduling for success
NASA Technical Reports Server (NTRS)
Manzanera, Ignacio
1994-01-01
Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.
A New Lagrangian Relaxation Method Considering Previous Hour Scheduling for Unit Commitment Problem
NASA Astrophysics Data System (ADS)
Khorasani, H.; Rashidinejad, M.; Purakbari-Kasmaie, M.; Abdollahi, A.
2009-08-01
Generation scheduling is a crucial challenge in power systems especially under new environment of liberalization of electricity industry. A new Lagrangian relaxation method for unit commitment (UC) has been presented for solving generation scheduling problem. This paper focuses on the economical aspect of UC problem, while the previous hour scheduling as a very important issue is studied. In this paper generation scheduling of present hour has been conducted by considering the previous hour scheduling. The impacts of hot/cold start-up cost have been taken in to account in this paper. Case studies and numerical analysis presents significant outcomes while it demonstrates the effectiveness of the proposed method.
77 FR 35338 - Schedule of Fees Authorized
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... registration program, to cover the cost of making import eligibility decisions, and to cover the cost of... establishes to cover the costs of ``making the decisions under this subchapter.'' This includes decisions on... for the cost of carrying out the registration program and making eligibility decisions, and to...
NASA Technical Reports Server (NTRS)
Broadway, Jeramie; Hickman, Robert; Mireles, Omar
2012-01-01
NTP is attractive for space exploration because: (1) Higher Isp than traditional chemical rockets (2)Shorter trip times (3) Reduced propellant mass (4) Increased payload. Lack of qualified fuel material is a key risk (cost, schedule, and performance). Development of stable fuel form is a critical path, long lead activity. Goals of this project are: Mature CERMET and Graphite based fuel materials and Develop and demonstrate critical technologies and capabilities.
NASA Technical Reports Server (NTRS)
Jr., R. F. Miles
1995-01-01
Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.
Photovoltaic system criteria documents. Volume 4: Review criteria for photovoltaic applications
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided for the organization, preparation and conduct of program reviews for photovoltaic applications. These criteria apply to all photovoltaic applications. They include, but are not limited to, the following: (1) Conceptual design review; (2) Preliminary design review; (3) Critical design review; and (4) Operational readiness review. Contract goal's and objectives are met through program monitoring for cost, schedule, and performance for both managerial and technical elements for all PV applications activities.
2014-01-01
29 Draft Joint Test Protocol – Validation of Pretreatments for Steel Armor 68 4.4.7 Rising Step Load (Stress Corrosion Cracking) 4.4.7.1...Cost Assessment 27 9. Schedule of Activities 29 10. Management and Staffing 29 11. References 30 Appendix A. Joint Test Protocol 33 Appendix B...in accordance with the tests delineated in the joint test protocol (JTP) provided in appendix A. The functional performance objectives are
The ATA-67 Formula for Direct Operating Cost
NASA Technical Reports Server (NTRS)
Faulkner, H. B.
1972-01-01
The ATA formulas for direct operating cost were developed for the purpose of comparing different aircraft, existing or not, on the same route or the same aircraft on different routes. Such characteristics of the airline as crew pay, maintenance procedures, and depreciation schedules are kept constant. In air transportation systems analysis the 1967 ATA formula is usually used with appropriate exceptions or modifications, such as: different maintenance labor rate, total maintenance multiplied by a factor, maintenance burden deleted, different depreciation schedule, or different spares percentages.
Causes of catastrophic failure in complex systems
NASA Astrophysics Data System (ADS)
Thomas, David A.
2010-08-01
Root causes of mission critical failures and major cost and schedule overruns in complex systems and programs are studied through the post-mortem analyses compiled for several examples, including the Hubble Space Telescope, the Challenger and Columbia Shuttle accidents, and the Three Mile Island nuclear power plant accident. The roles of organizational complexity, cognitive biases in decision making, the display of quantitative data, and cost and schedule pressure are all considered. Recommendations for mitigating the risk of similar failures in future programs are also provided.
29 CFR Appendix A to Part 2201 - Schedule of Fees
Code of Federal Regulations, 2011 CFR
2011-07-01
... IMPLEMENTING THE FREEDOM OF INFORMATION ACT Pt. 2201, App. A Appendix A to Part 2201—Schedule of Fees Type of... and above) 76 Duplication cost per page 0.25 Computer printout copying fee 0.40 Searches of...
Assessing the Benefits of NASA Category 3, Low Cost Class C/D Missions
NASA Technical Reports Server (NTRS)
Bitten, Robert E.; Shinn, Steven A.; Mahr, Eric M.
2013-01-01
Category 3, Class C/D missions have the benefit of delivering worthwhile science at minimal cost which is increasingly important in NASA's constrained budget environment. Although higher cost Category 1 and 2 missions are necessary to achieve NASA's science objectives, Category 3 missions are shown to be an effective way to provide significant science return at a low cost. Category 3 missions, however, are often reviewed the same as the more risk averse Category 1 and 2 missions. Acknowledging that reviews are not the only aspect of a total engineering effort, reviews are still a significant concern for NASA programs. This can unnecessarily increase the cost and schedule of Category 3 missions. This paper quantifies the benefit and performance of Category 3 missions by looking at the cost vs. capability relative to Category 1 and 2 missions. Lessons learned from successful organizations that develop low cost Category 3, Class C/D missions are also investigated to help provide the basis for suggestions to streamline the review of NASA Category 3 missions.
Doria, Andrea S; Amernic, Heidi; Dick, Paul; Babyn, Paul; Chait, Peter; Langer, Jacob; Coyte, Peter C; Ungar, Wendy J
2005-12-01
Assessment of appendicitis during a weeknight or weekend shift (after-hours period, AHP) might be more costly and less effective than its assessment on a weekday shift (standard hours period, SHP) because of increased costs (staff premium fees) and perforation risk (longer delays and less experience of fellows). The objectives were to compare the costs and effectiveness of assessing children with suspected appendicitis who required a laparotomy and had US or CT after-hours with those of assessing children during standard hours, and to evaluate the importance of diagnostic imaging (DI) within the overall costs. We retrospectively microcosted resource use within six areas of a tertiary hospital (emergency [ED], diagnostic imaging (DI), surgery, wards, transport, and pathology) in a tertiary hospital. About 41 children (1.8-17 years) in the AHP and 35 (2.9-16 years) in the SHP were evaluated. Work shift effectiveness was measured with a histological score that assessed the severity of appendicitis (non-perforated appendicitis: scores 1-3; perforated appendicitis: score 4). The SHP was less costly and more effective regardless of whether the calculation included US or CT costs only. For a salary-based fee schedule, 733 US dollars were saved per case of perforated appendicitis averted in the SHP. For a fee-for-service payment schedule, 847 dollars were saved. Within the overall budget, the highest costs were those incurred on the ward for both shifts. The average cost per patient in DI ranged from 2 to 5% of the total costs in both shifts. Most perforation cases were found in the AHP (31.7%, AHP vs. 17.1%, SHP), which resulted in higher ward costs for patients in the AHP. A higher proportion of severe cases was seen in the AHP, which led to its higher costs. As a result, the SHP dominated the AHP, being less costly and more effective regardless of the fee schedule applied. The DI costs contributed little to the overall cost of the assessment of appendicitis.
Manage indirect practice expense the way you practice medicine: with information.
Zeller, T L; Senagore, A J; Siegel, G
1999-05-01
Surgeons are increasingly faced with the pressures of maintaining the highest quality of patient care, while at the same time maintaining financial viability. The purpose of this project was to provide a framework for analyzing practice costs for colorectal surgeons using an activity-based cost accounting model. A survey of 11 practices that were diverse in terms of geography, managed care penetration, academic vs. private practice style, and case distribution was performed. In activity-based costing the assignment of typical costs such as staff salaries are assigned to the appropriate business process. The business processes employed in this study were service patients in the office, perform in-office procedures, schedule cases in facilities, service patients in the hospital, insurance authorization, maintain medical records, billing, collections, resolve billing disputes, interaction with third parties, maintain professional education, sustain and manage the practice, maintain the facility, teaching and research, and performing drug studies. The final step is to assign the cost associated with all appropriate business processes to the appropriate cost object. The cost objects in this study were defined as a charge office visit, no-charge office visit, charge hospital visit, in-office procedures, in-facility procedures, and performing drug studies. The data were then analyzed to allow a comparison of four similar practices within the study group. The data demonstrated that the cost of seeing a charge office visit ranged from $55 to $105. Similarly, the cost of seeing a no-charge office visit during the global period ranged from $43 to $100. The study analyzed possible explanations for the wide variability in these costs. It is essential that physicians clearly understand the sources of expenses generated by the operation of their practices. A clear comprehension of costs will lead colorectal surgeons to make appropriate decisions regarding such important issues as office staffing ratios, office square footage, and instrumentation acquisitions.
A pragmatic decision model for inventory management with heterogeneous suppliers
NASA Astrophysics Data System (ADS)
Nakandala, Dilupa; Lau, Henry; Zhang, Jingjing; Gunasekaran, Angappa
2018-05-01
For enterprises, it is imperative that the trade-off between the cost of inventory and risk implications is managed in the most efficient manner. To explore this, we use the common example of a wholesaler operating in an environment where suppliers demonstrate heterogeneous reliability. The wholesaler has partial orders with dual suppliers and uses lateral transshipments. While supplier reliability is a key concern in inventory management, reliable suppliers are more expensive and investment in strategic approaches that improve supplier performance carries a high cost. Here we consider the operational strategy of dual sourcing with reliable and unreliable suppliers and model the total inventory cost where the likely scenario lead-time of the unreliable suppliers extends beyond the scheduling period. We then develop a Customized Integer Programming Optimization Model to determine the optimum size of partial orders with multiple suppliers. In addition to the objective of total cost optimization, this study takes into account the volatility of the cost associated with the uncertainty of an inventory system.
Anzai, Yoshimi; Heilbrun, Marta E; Haas, Derek; Boi, Luca; Moshre, Kirk; Minoshima, Satoshi; Kaplan, Robert; Lee, Vivian S
2017-02-01
The lack of understanding of the real costs (not charge) of delivering healthcare services poses tremendous challenges in the containment of healthcare costs. In this study, we applied an established cost accounting method, the time-driven activity-based costing (TDABC), to assess the costs of performing an abdomen and pelvis computed tomography (AP CT) in an academic radiology department and identified opportunities for improved efficiency in the delivery of this service. The study was exempt from an institutional review board approval. TDABC utilizes process mapping tools from industrial engineering and activity-based costing. The process map outlines every step of discrete activity and duration of use of clinical resources, personnel, and equipment. By multiplying the cost per unit of capacity by the required task time for each step, and summing each component cost, the overall costs of AP CT is determined for patients in three settings, inpatient (IP), outpatient (OP), and emergency departments (ED). The component costs to deliver an AP CT study were as follows: radiologist interpretation: 40.1%; other personnel (scheduler, technologist, nurse, pharmacist, and transporter): 39.6%; materials: 13.9%; and space and equipment: 6.4%. The cost of performing CT was 13% higher for ED patients and 31% higher for inpatients (IP), as compared to that for OP. The difference in cost was mostly due to non-radiologist personnel costs. Approximately 80% of the direct costs of AP CT to the academic medical center are related to labor. Potential opportunities to reduce the costs include increasing the efficiency of utilization of CT, substituting lower cost resources when appropriate, and streamlining the ordering system to clarify medical necessity and clinical indications. Copyright © 2017 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, BE
2003-10-07
The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach tomore » waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435,000 below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.« less
Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition
NASA Technical Reports Server (NTRS)
1971-01-01
This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.
Near-Net Shape Powder Metallurgy Rhenium Thruster
NASA Technical Reports Server (NTRS)
Leonhardt, Todd; Hamister, Mark; Carlen, Jan C.; Biaglow, James; Reed, Brian
2001-01-01
This paper describes the development of a method to produce a near-net shape (NNS) powder metallurgy (PM) rhenium combustion chamber of the size 445 N (100 lbf) used in a high performance liquid apogee engine. These engines are used in low earth Orbit and geostationary orbit for satellite positioning systems. The developments in near-net shape powder metallurgy rhenium combustion chambers reported in this paper will reduce manufacturing cost of the rhenium chambers by 25 percent, and reduce the manufacturing time by 30 to 40 percent. The quantity of rhenium metal powder used to produce a rhenium chamber is reduced by approximately 70 percent and the subsequent reduction in machining schedule and costs is nearly 50 percent.
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
The use of cluster analysis techniques in spaceflight project cost risk estimation
NASA Technical Reports Server (NTRS)
Fox, G.; Ebbeler, D.; Jorgensen, E.
2003-01-01
Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.
1988-09-01
20 SLIM . . . . .e & . . . . . . . . . . . . 24 SoftCost-R . . . . . . . . . . . . . . . 26 SPQR /20 . . . . . . . . . . .*. . . . . 28...PRICB-8 . . . . . . . . . . .. . 83 softCost-R ............. 84 SPQR /20 . . . . . . . . . . . . 0 . 84 System-3 . . . . . . . . . . . . . . 85 Summry...128 Appendix G: SoftCost-R Input Values . . . . . . . . . . 129 Appendix H: SoftCost-R Resources Estimate . . . . . . . 131 Appendix I: SPQR
14 CFR 1214.202 - Reimbursement policy.
Code of Federal Regulations, 2010 CFR
2010-01-01
... according to the reimbursement schedule plus short term call-up additional costs. The additional costs will... services. (2) The price will be based on estimated costs. (3) The price will be held constant for flights...) Subsequent to the first three years, the price will be adjusted annually to insure that total operating costs...
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2013 CFR
2013-10-01
... is available from the Division of Scientific Resources, Centers for Disease Control, 1600 Clifton..., and a proportionate share of management and administrative costs), and the cost of particular...
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2014 CFR
2014-10-01
... is available from the Division of Scientific Resources, Centers for Disease Control, 1600 Clifton..., and a proportionate share of management and administrative costs), and the cost of particular...
Penny, Melissa A; Verity, Robert; Bever, Caitlin A; Sauboin, Christophe; Galactionova, Katya; Flasche, Stefan; White, Michael T; Wenger, Edward A; Van de Velde, Nicolas; Pemberton-Ross, Peter; Griffin, Jamie T; Smith, Thomas A; Eckhoff, Philip A; Muhib, Farzana; Jit, Mark; Ghani, Azra C
2016-01-23
The phase 3 trial of the RTS,S/AS01 malaria vaccine candidate showed modest efficacy of the vaccine against Plasmodium falciparum malaria, but was not powered to assess mortality endpoints. Impact projections and cost-effectiveness estimates for longer timeframes than the trial follow-up and across a range of settings are needed to inform policy recommendations. We aimed to assess the public health impact and cost-effectiveness of routine use of the RTS,S/AS01 vaccine in African settings. We compared four malaria transmission models and their predictions to assess vaccine cost-effectiveness and impact. We used trial data for follow-up of 32 months or longer to parameterise vaccine protection in the group aged 5-17 months. Estimates of cases, deaths, and disability-adjusted life-years (DALYs) averted were calculated over a 15 year time horizon for a range of levels of Plasmodium falciparum parasite prevalence in 2-10 year olds (PfPR2-10; range 3-65%). We considered two vaccine schedules: three doses at ages 6, 7·5, and 9 months (three-dose schedule, 90% coverage) and including a fourth dose at age 27 months (four-dose schedule, 72% coverage). We estimated cost-effectiveness in the presence of existing malaria interventions for vaccine prices of US$2-10 per dose. In regions with a PfPR2-10 of 10-65%, RTS,S/AS01 is predicted to avert a median of 93,940 (range 20,490-126,540) clinical cases and 394 (127-708) deaths for the three-dose schedule, or 116,480 (31,450-160,410) clinical cases and 484 (189-859) deaths for the four-dose schedule, per 100,000 fully vaccinated children. A positive impact is also predicted at a PfPR2-10 of 5-10%, but there is little impact at a prevalence of lower than 3%. At $5 per dose and a PfPR2-10 of 10-65%, we estimated a median incremental cost-effectiveness ratio compared with current interventions of $30 (range 18-211) per clinical case averted and $80 (44-279) per DALY averted for the three-dose schedule, and of $25 (16-222) and $87 (48-244), respectively, for the four-dose schedule. Higher ICERs were estimated at low PfPR2-10 levels. We predict a significant public health impact and high cost-effectiveness of the RTS,S/AS01 vaccine across a wide range of settings. Decisions about implementation will need to consider levels of malaria burden, the cost-effectiveness and coverage of other malaria interventions, health priorities, financing, and the capacity of the health system to deliver the vaccine. PATH Malaria Vaccine Initiative; Bill & Melinda Gates Foundation; Global Good Fund; Medical Research Council; UK Department for International Development; GAVI, the Vaccine Alliance; WHO. Copyright © 2016 Penny et al. Open Access article distributed under the terms of CC BY. Published by Elsevier Ltd.. All rights reserved.
Penny, Melissa A; Verity, Robert; Bever, Caitlin A; Sauboin, Christophe; Galactionova, Katya; Flasche, Stefan; White, Michael T; Wenger, Edward A; Van de Velde, Nicolas; Pemberton-Ross, Peter; Griffin, Jamie T; Smith, Thomas A; Eckhoff, Philip A; Muhib, Farzana; Jit, Mark; Ghani, Azra C
2016-01-01
Summary Background The phase 3 trial of the RTS,S/AS01 malaria vaccine candidate showed modest efficacy of the vaccine against Plasmodium falciparum malaria, but was not powered to assess mortality endpoints. Impact projections and cost-effectiveness estimates for longer timeframes than the trial follow-up and across a range of settings are needed to inform policy recommendations. We aimed to assess the public health impact and cost-effectiveness of routine use of the RTS,S/AS01 vaccine in African settings. Methods We compared four malaria transmission models and their predictions to assess vaccine cost-effectiveness and impact. We used trial data for follow-up of 32 months or longer to parameterise vaccine protection in the group aged 5–17 months. Estimates of cases, deaths, and disability-adjusted life-years (DALYs) averted were calculated over a 15 year time horizon for a range of levels of Plasmodium falciparum parasite prevalence in 2–10 year olds (PfPR2–10; range 3–65%). We considered two vaccine schedules: three doses at ages 6, 7·5, and 9 months (three-dose schedule, 90% coverage) and including a fourth dose at age 27 months (four-dose schedule, 72% coverage). We estimated cost-effectiveness in the presence of existing malaria interventions for vaccine prices of US$2–10 per dose. Findings In regions with a PfPR2–10 of 10–65%, RTS,S/AS01 is predicted to avert a median of 93 940 (range 20 490–126 540) clinical cases and 394 (127–708) deaths for the three-dose schedule, or 116 480 (31 450–160 410) clinical cases and 484 (189–859) deaths for the four-dose schedule, per 100 000 fully vaccinated children. A positive impact is also predicted at a PfPR2–10 of 5–10%, but there is little impact at a prevalence of lower than 3%. At $5 per dose and a PfPR2–10 of 10–65%, we estimated a median incremental cost-effectiveness ratio compared with current interventions of $30 (range 18–211) per clinical case averted and $80 (44–279) per DALY averted for the three-dose schedule, and of $25 (16–222) and $87 (48–244), respectively, for the four-dose schedule. Higher ICERs were estimated at low PfPR2–10 levels. Interpretation We predict a significant public health impact and high cost-effectiveness of the RTS,S/AS01 vaccine across a wide range of settings. Decisions about implementation will need to consider levels of malaria burden, the cost-effectiveness and coverage of other malaria interventions, health priorities, financing, and the capacity of the health system to deliver the vaccine. Funding PATH Malaria Vaccine Initiative; Bill & Melinda Gates Foundation; Global Good Fund; Medical Research Council; UK Department for International Development; GAVI, the Vaccine Alliance; WHO. PMID:26549466
Fairness in optimizing bus-crew scheduling process.
Ma, Jihui; Song, Cuiying; Ceder, Avishai Avi; Liu, Tao; Guan, Wei
2017-01-01
This work proposes a model considering fairness in the problem of crew scheduling for bus drivers (CSP-BD) using a hybrid ant-colony optimization (HACO) algorithm to solve it. The main contributions of this work are the following: (a) a valid approach for cases with a special cost structure and constraints considering the fairness of working time and idle time; (b) an improved algorithm incorporating Gamma heuristic function and selecting rules. The relationships of each cost are examined with ten bus lines collected from the Beijing Public Transport Holdings (Group) Co., Ltd., one of the largest bus transit companies in the world. It shows that unfair cost is indirectly related to common cost, fixed cost and extra cost and also the unfair cost approaches to common and fixed cost when its coefficient is twice of common cost coefficient. Furthermore, the longest time for the tested bus line with 1108 pieces, 74 blocks is less than 30 minutes. The results indicate that the HACO-based algorithm can be a feasible and efficient optimization technique for CSP-BD, especially with large scale problems.
NASA Technical Reports Server (NTRS)
Lee, C. S. G.; Chen, C. L.
1989-01-01
Two efficient mapping algorithms for scheduling the robot inverse dynamics computation consisting of m computational modules with precedence relationship to be executed on a multiprocessor system consisting of p identical homogeneous processors with processor and communication costs to achieve minimum computation time are presented. An objective function is defined in terms of the sum of the processor finishing time and the interprocessor communication time. The minimax optimization is performed on the objective function to obtain the best mapping. This mapping problem can be formulated as a combination of the graph partitioning and the scheduling problems; both have been known to be NP-complete. Thus, to speed up the searching for a solution, two heuristic algorithms were proposed to obtain fast but suboptimal mapping solutions. The first algorithm utilizes the level and the communication intensity of the task modules to construct an ordered priority list of ready modules and the module assignment is performed by a weighted bipartite matching algorithm. For a near-optimal mapping solution, the problem can be solved by the heuristic algorithm with simulated annealing. These proposed optimization algorithms can solve various large-scale problems within a reasonable time. Computer simulations were performed to evaluate and verify the performance and the validity of the proposed mapping algorithms. Finally, experiments for computing the inverse dynamics of a six-jointed PUMA-like manipulator based on the Newton-Euler dynamic equations were implemented on an NCUBE/ten hypercube computer to verify the proposed mapping algorithms. Computer simulation and experimental results are compared and discussed.
24 CFR 982.517 - Utility allowance schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., the PHA also must provide any information or procedures used in preparation of the schedule. (b) How... services according to the following general categories: space heating; air conditioning; cooking; water heating; water; sewer; trash collection (disposal of waste and refuse); other electric; refrigerator (cost...
1993-10-01
we identified 42 items 8 paid for under the orthotic and prosthetic fee schedule that do not require professional fabrication or fitting services . We...HRD-92-38R). Medicare : Program and Beneficiary Costs Under Durable Medical Equipment Fee Schedules (Report, July 7, 1992, GAO/HRD-92-78). Medicaid...Report with same title (Nov. 12, 1991, GAO/HRD-92-11). Medicare : Effect of Durable Medical Equipment Fee Schedules on Six Suppliers’ Profits (Report, Nov
Zagreb Regimen, an Abbreviated Intramuscular Schedule for Rabies Vaccination
Ren, Jiangping; Yao, Linong; Sun, Jimin
2014-01-01
The Zagreb regimen, an abbreviated intramuscular schedule for rabies vaccination, was developed by I. Vodopija and colleagues of the Zagreb Institute of Public Health in Croatia in the 1980s. It was recommended by WHO as one of the intramuscular (IM) schedules for rabies vaccination in 2010. We reviewed the literature on the immunogenicity, safety, economic burden, and compliance of the Zagreb 2-1-1 regimen. Compared to Essen, another IM schedule recommended by WHO, Zagreb has higher compliance, lower medical cost, and better immunogenicity at an early stage. PMID:25392012
Charge scheduling of an energy storage system under time-of-use pricing and a demand charge.
Yoon, Yourim; Kim, Yong-Hyuk
2014-01-01
A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power.
Design principles and algorithms for automated air traffic management
NASA Technical Reports Server (NTRS)
Erzberger, Heinz
1995-01-01
This paper presents design principles and algorithm for building a real time scheduler. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high altitude airspace far from the airport and low altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time.
Charge Scheduling of an Energy Storage System under Time-of-Use Pricing and a Demand Charge
Yoon, Yourim
2014-01-01
A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power. PMID:25197720
A modify ant colony optimization for the grid jobs scheduling problem with QoS requirements
NASA Astrophysics Data System (ADS)
Pu, Xun; Lu, XianLiang
2011-10-01
Job scheduling with customers' quality of service (QoS) requirement is challenging in grid environment. In this paper, we present a modify Ant colony optimization (MACO) for the Job scheduling problem in grid. Instead of using the conventional construction approach to construct feasible schedules, the proposed algorithm employs a decomposition method to satisfy the customer's deadline and cost requirements. Besides, a new mechanism of service instances state updating is embedded to improve the convergence of MACO. Experiments demonstrate the effectiveness of the proposed algorithm.
Smart sensing to drive real-time loads scheduling algorithm in a domotic architecture
NASA Astrophysics Data System (ADS)
Santamaria, Amilcare Francesco; Raimondo, Pierfrancesco; De Rango, Floriano; Vaccaro, Andrea
2014-05-01
Nowadays the focus on power consumption represent a very important factor regarding the reduction of power consumption with correlated costs and the environmental sustainability problems. Automatic control load based on power consumption and use cycle represents the optimal solution to costs restraint. The purpose of these systems is to modulate the power request of electricity avoiding an unorganized work of the loads, using intelligent techniques to manage them based on real time scheduling algorithms. The goal is to coordinate a set of electrical loads to optimize energy costs and consumptions based on the stipulated contract terms. The proposed algorithm use two new main notions: priority driven loads and smart scheduling loads. The priority driven loads can be turned off (stand by) according to a priority policy established by the user if the consumption exceed a defined threshold, on the contrary smart scheduling loads are scheduled in a particular way to don't stop their Life Cycle (LC) safeguarding the devices functions or allowing the user to freely use the devices without the risk of exceeding the power threshold. The algorithm, using these two kind of notions and taking into account user requirements, manages loads activation and deactivation allowing the completion their operation cycle without exceeding the consumption threshold in an off-peak time range according to the electricity fare. This kind of logic is inspired by industrial lean manufacturing which focus is to minimize any kind of power waste optimizing the available resources.
Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao
2016-01-01
Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.
NASA Astrophysics Data System (ADS)
Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian
2018-05-01
Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.
A Hybrid Cellular Genetic Algorithm for Multi-objective Crew Scheduling Problem
NASA Astrophysics Data System (ADS)
Jolai, Fariborz; Assadipour, Ghazal
Crew scheduling is one of the important problems of the airline industry. This problem aims to cover a number of flights by crew members, such that all the flights are covered. In a robust scheduling the assignment should be so that the total cost, delays, and unbalanced utilization are minimized. As the problem is NP-hard and the objectives are in conflict with each other, a multi-objective meta-heuristic called CellDE, which is a hybrid cellular genetic algorithm, is implemented as the optimization method. The proposed algorithm provides the decision maker with a set of non-dominated or Pareto-optimal solutions, and enables them to choose the best one according to their preferences. A set of problems of different sizes is generated and solved using the proposed algorithm. Evaluating the performance of the proposed algorithm, three metrics are suggested, and the diversity and the convergence of the achieved Pareto front are appraised. Finally a comparison is made between CellDE and PAES, another meta-heuristic algorithm. The results show the superiority of CellDE.
Flight Departure Delay and Rerouting Under Uncertainty in En Route Convective Weather
NASA Technical Reports Server (NTRS)
Mukherjee, Avijit; Grabbe, Shon; Sridhar, Banavar
2011-01-01
Delays caused by uncertainty in weather forecasts can be reduced by improving traffic flow management decisions. This paper presents a methodology for traffic flow management under uncertainty in convective weather forecasts. An algorithm for assigning departure delays and reroutes to aircraft is presented. Departure delay and route assignment are executed at multiple stages, during which, updated weather forecasts and flight schedules are used. At each stage, weather forecasts up to a certain look-ahead time are treated as deterministic and flight scheduling is done to mitigate the impact of weather on four-dimensional flight trajectories. Uncertainty in weather forecasts during departure scheduling results in tactical airborne holding of flights. The amount of airborne holding depends on the accuracy of forecasts as well as the look-ahead time included in the departure scheduling. The weather forecast look-ahead time is varied systematically within the experiments performed in this paper to analyze its effect on flight delays. Based on the results, longer look-ahead times cause higher departure delays and additional flying time due to reroutes. However, the amount of airborne holding necessary to prevent weather incursions reduces when the forecast look-ahead times are higher. For the chosen day of traffic and weather, setting the look-ahead time to 90 minutes yields the lowest total delay cost.
Yang, Yi; Wang, Shuqing; Liu, Yang
2014-01-01
Order insertion often occurs in the scheduling process of logistics service supply chain (LSSC), which disturbs normal time scheduling especially in the environment of mass customization logistics service. This study analyses order similarity coefficient and order insertion operation process and then establishes an order insertion scheduling model of LSSC with service capacity and time factors considered. This model aims to minimize the average unit volume operation cost of logistics service integrator and maximize the average satisfaction degree of functional logistics service providers. In order to verify the viability and effectiveness of our model, a specific example is numerically analyzed. Some interesting conclusions are obtained. First, along with the increase of completion time delay coefficient permitted by customers, the possible inserting order volume first increases and then trends to be stable. Second, supply chain performance reaches the best when the volume of inserting order is equal to the surplus volume of the normal operation capacity in mass service process. Third, the larger the normal operation capacity in mass service process is, the bigger the possible inserting order's volume will be. Moreover, compared to increasing the completion time delay coefficient, improving the normal operation capacity of mass service process is more useful. PMID:25276851
Managing large energy and mineral resources (EMR) projects in challenging environments
NASA Astrophysics Data System (ADS)
Chanmeka, Arpamart
The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.
Spaceport Performance Measures
NASA Technical Reports Server (NTRS)
Finger, G. Wayne
2010-01-01
Spaceports have traditionally been characterized by performance measures associated with their site characteristics. Measures such as "Latitude" (proximity to the equator), "Azimuth" (range of available launch azimuths) and "Weather" (days of favorable weather) are commonly used to characterize a particular spaceport. However, other spaceport performance measures may now be of greater value. These measures can provide insight into areas of operational differences between competing spaceports and identify areas for improving the performance of spaceports. This paper suggests Figures of Merit (FOMs) for spaceport "Capacity" (number of potential launch opportunities per year and / or potential mass' to low earth orbit (LEO) per year); "Throughput" (actual mass to orbit per year compared to capacity); "Productivity" (labor effort hours per unit mass to orbit); "Energy Efficiency" (joules expended at spaceport per unit mass to orbit); "Carbon Footprint" tons CO2 per unit mass to orbit). Additional FOMS are investigated with regards to those areas of special interest to commercial launch operators, such as "Assignment Schedule" (days required for a binding assignment of a launch site from the spaceport); "Approval Schedule" (days to complete a range safety assessment leading to an approval or disapproval of a launch vehicle); "Affordability" (cost for a spaceport to assess a new launch vehicle); "Launch Affordability" (fixed range costs per launch); "Reconfigure Time" (hours to reconfigure the range from one vehicle's launch ready configuration to another vehicle's configuration); "Turn,Around Time" (minimum range hours required between launches of an identical type launch vehicle). Available or notional data is analyzed for the KSC/CCAFS area and other spaceports. Observations regarding progress over the past few decades are made. Areas where improvement are needed or indicated are suggested.
48 CFR 49.303-2 - Submission of inventory disposal schedules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of inventory disposal schedules. 49.303-2 Section 49.303-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement...
Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P
2016-09-13
In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid residency programs in schedule analysis and redesign.
Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program
NASA Technical Reports Server (NTRS)
Rodionova, Olga; Arneson, Heather; Sridhar, Banavar; Evans, Antony
2017-01-01
The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.
An improved robust buffer allocation method for the project scheduling problem
NASA Astrophysics Data System (ADS)
Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad
2017-04-01
Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.
NASA Technical Reports Server (NTRS)
Wilcox, Margaret
2008-01-01
A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.
Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-08-01
The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first sectionmore » is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.« less
Modelling of project cash flow on construction projects in Malang city
NASA Astrophysics Data System (ADS)
Djatmiko, Bambang
2017-09-01
Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.
General risks for tunnelling projects: An overview
NASA Astrophysics Data System (ADS)
Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda
2017-10-01
Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.
NASA Technical Reports Server (NTRS)
Obrien, Charles J.
1993-01-01
Existing NASA research contracts are supporting development of advanced reinforced polymer and metal matrix composites for use in liquid rocket engines of the future. Advanced rocket propulsion concepts, such as modular platelet engines, dual-fuel dual-expander engines, and variable mixture ratio engines, require advanced materials and structures to reduce overall vehicle weight as well as address specific propulsion system problems related to elevated operating temperatures, new engine components, and unique operating processes. High performance propulsion systems with improved manufacturability and maintainability are needed for single stage to orbit vehicles and other high performance mission applications. One way to satisfy these needs is to develop a small engine which can be clustered in modules to provide required levels of total thrust. This approach should reduce development schedule and cost requirements by lowering hardware lead times and permitting the use of existing test facilities. Modular engines should also reduce operational costs associated with maintenance and parts inventories.