NASA Technical Reports Server (NTRS)
1998-01-01
Crystal River Engineering was originally featured in Spinoff 1992 with the Convolvotron, a high speed digital audio processing system that delivers three-dimensional sound over headphones. The Convolvotron was developed for Ames' research on virtual acoustic displays. Crystal River is a now a subsidiary of Aureal Semiconductor, Inc. and they together develop and market the technology, which is a 3-D (three dimensional) audio technology known commercially today as Aureal 3D (A-3D). The technology has been incorporated into video games, surround sound systems, and sound cards.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
...., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown Decommissioning Activities Report AGENCY...) Accession No. ML13340A009), for the Crystal River Unit 3 Nuclear Generating Plant (CR-3). The PSDAR provides.... until 9 p.m., EST, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility...
76 FR 5216 - Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... for Crystal River from 24 to 26 months on a one-time only basis. The proposed exemption does not make... licensed operator requalification program period for Crystal River from 24 to 26 months on a one-time only....59, by allowing Crystal River a one-time extension in the allowed time for completing the current...
The effects of parameter variation on MSET models of the Crystal River-3 feedwater flow system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miron, A.
1998-04-01
In this paper we develop further the results reported in Reference 1 to include a systematic study of the effects of varying MSET models and model parameters for the Crystal River-3 (CR) feedwater flow system The study used archived CR process computer files from November 1-December 15, 1993 that were provided by Florida Power Corporation engineers Fairman Bockhorst and Brook Julias. The results support the conclusion that an optimal MSET model, properly trained and deriving its inputs in real-time from no more than 25 of the sensor signals normally provided to a PWR plant process computer, should be able tomore » reliably detect anomalous variations in the feedwater flow venturis of less than 0.1% and in the absence of a venturi sensor signal should be able to generate a virtual signal that will be within 0.1% of the correct value of the missing signal.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-14
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2011-0301] Crystal River Unit 3 Nuclear... the Crystal River Unit 3 Nuclear Generating Plant (CR-3), located in Florida, Citrus County. The... notice (if that document is available in ADAMS) is provided the first time that a document is referenced...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2009-0039] Crystal River Nuclear Generating... in ADAMS) is provided the first time that a document is referenced. NRC's PDR: You may examine and... operating license DPR-72, which authorizes Florida Power Corporaton (FPC) to operate the Crystal River...
Kieffer, S.W.
1985-01-01
At Crystal Creek, a debris fan was emplaced in 1966, constricting the channel of the Colorado River to about 0.25 of its upstream width between 1967 and 1983, forming a major rapid. The hydraulics of Crystal Creek rapid are described, and an analysis is presented to support the hypothesis that the major wave in the rapid was a normal wave (one type of hydraulic jump). Hydraulic jumps rarely occur in natural river channels with erodible beds, but one was present at Crystal Rapid because of the unusually severe constriction of the Colorado River by the 1966 debris fan. A quantitative model for river debris fan shapes is proposed and is used to estimate prehistoric flood levels from the observed constrictions: the 0.5 value of river constriction found at the more mature debris fans in the Grand Canyon suggests that peak flood discharges of approximately 11 320 m3/s have occurred. -from Author
1. Photocopy of engineering drawing (original in the Office of ...
1. Photocopy of engineering drawing (original in the Office of the Cuyahoga County Engineer)--1907 NORTH ROCKY RIVER BRIDGE--PROPOSED DESIGN--REINFORCED CONCRETE: AN ALTERNATIVE DESIGN FOR THE DETROIT AVENUE CROSSING - Rocky River Bridge, Spanning Beaver Dam River, Rocky River, Cuyahoga County, OH
2017-09-18
Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental
78 FR 58338 - Proposed Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
.../preliminaryfloodhazarddata preliminaryfloodhazarddata City of Crystal River City Hall, 123 NW U.S. Highway 19, Crystal River.../preliminaryfloodhazarddata preliminaryfloodhazarddata City of Carbon Hill City Hall, 170 NW 2nd Avenue, Carbon Hill, AL 35549. City of Cordova City Hall, 74 Main Street, Cordova, AL 35550. City of Dora City Hall, 1485 Sharon...
NASA Engine Icing Research Overview: Aeronautics Evaluation and Test Capabilities (AETC) Project
NASA Technical Reports Server (NTRS)
Veres, Joseph P.
2015-01-01
The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported by airlines under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion by the engine. The ice crystals can result in degraded engine performance, loss of thrust control, compressor surge or stall, and flameout of the combustor. The Aviation Safety Program at NASA has taken on the technical challenge of a turbofan engine icing caused by ice crystals which can exist in high altitude convective clouds. The NASA engine icing project consists of an integrated approach with four concurrent and ongoing research elements, each of which feeds critical information to the next element. The project objective is to gain understanding of high altitude ice crystals by developing knowledge bases and test facilities for testing full engines and engine components. The first element is to utilize a highly instrumented aircraft to characterize the high altitude convective cloud environment. The second element is the enhancement of the Propulsion Systems Laboratory altitude test facility for gas turbine engines to include the addition of an ice crystal cloud. The third element is basic research of the fundamental physics associated with ice crystal ice accretion. The fourth and final element is the development of computational tools with the goal of simulating the effects of ice crystal ingestion on compressor and gas turbine engine performance. The NASA goal is to provide knowledge to the engine and aircraft manufacturing communities to help mitigate, or eliminate turbofan engine interruptions, engine damage, and failures due to ice crystal ingestion.
Engineering calcium oxalate crystal formation in Arabidopsis
USDA-ARS?s Scientific Manuscript database
Many plants accumulate crystals of calcium oxalate. Just how these crystals form remains unknown. To gain insight into the mechanisms regulating calcium oxalate crystal formation, a crystal engineering approach was initiated utilizing the non-crystal accumulating plant, Arabidopsis. The success of t...
Physical-scale models of engineered log jams in rivers
USDA-ARS?s Scientific Manuscript database
Stream restoration and river engineering projects are employing engineered log jams increasingly for stabilization and in-stream improvements. To further advance the design of these structures and their morphodynamic effects on corridors, the basis for physical-scale models of rivers with engineere...
Fluvial geomorphology and river engineering: future roles utilizing a fluvial hydrosystems framework
NASA Astrophysics Data System (ADS)
Gilvear, David J.
1999-12-01
River engineering is coming under increasing public scrutiny given failures to prevent flood hazards and economic and environmental concerns. This paper reviews the contribution that fluvial geomorphology can make in the future to river engineering. In particular, it highlights the need for fluvial geomorphology to be an integral part in engineering projects, that is, to be integral to the planning, implementation, and post-project appraisal stages of engineering projects. It should be proactive rather than reactive. Areas in which geomorphologists will increasingly be able to complement engineers in river management include risk and environmental impact assessment, floodplain planning, river audits, determination of instream flow needs, river restoration, and design of ecologically acceptable channels and structures. There are four key contributions that fluvial geomorphology can make to the engineering profession with regard to river and floodplain management: to promote recognition of lateral, vertical, and downstream connectivity in the fluvial system and the inter-relationships between river planform, profile, and cross-section; to stress the importance of understanding fluvial history and chronology over a range of time scales, and recognizing the significance of both palaeo and active landforms and deposits as indicators of levels of landscape stability; to highlight the sensitivity of geomorphic systems to environmental disturbances and change, especially when close to geomorphic thresholds, and the dynamics of the natural systems; and to demonstrate the importance of landforms and processes in controlling and defining fluvial biotopes and to thus promote ecologically acceptable engineering. Challenges facing fluvial geomorphology include: gaining full acceptance by the engineering profession; widespread utilization of new technologies including GPS, GIS, image analysis of satellite and airborne remote sensing data, computer-based hydraulic modeling and geophysical techniques; dovetailing engineering approaches to the study of river channels which emphasize reach-scale flow resistance, shear stresses, and material strength with catchment scale geomorphic approaches, empirical predictions, bed and bank processes, landform evolution, and magnitude-frequency concepts; producing accepted river channel typologies; fundamental research aimed at producing more reliable deterministic equations for prediction of bed and bank stability and bedload transport; and collaboration with aquatic biologists to determine the role and importance of geomorphologically and hydraulically defined habitats.
Human impacts on fluvial systems - A small-catchment case study
NASA Astrophysics Data System (ADS)
Pöppl, Ronald E.; Glade, Thomas; Keiler, Margreth
2010-05-01
Regulations of nearly two-thirds of the rivers worldwide have considerable influences on fluvial systems. In Austria, nearly any river (or) catchment is affected by humans, e.g. due to changing land-use conditions and river engineering structures. Recent studies of human impacts on rivers show that morphologic channel changes play a major role regarding channelization and leveeing, land-use conversions, dams, mining, urbanization and alterations of natural habitats (ecomorphology). Thus 'natural (fluvial) systems' are scarce and humans are almost always inseparably interwoven with them playing a major role in altering them coincidentally. The main objective of this study is to identify human effects (i.e. different land use conditions and river engineering structures) on river bed sediment composition and to delineate its possible implications for limnic habitats. The study area watersheds of the 'Fugnitz' River (~ 140km²) and the 'Kaja' River (~ 20km²) are located in the Eastern part of the Bohemian Massif in Austria (Europe) and drain into the 'Thaya' River which is the border river to the Czech Republic in the north of Lower Austria. Furthermore the 'Thaya' River is eponymous for the local National Park 'Nationalpark Thayatal'. In order to survey river bed sediment composition and river engineering structures facies mapping techniques, i.e. river bed surface mapping and ecomorphological mapping have been applied. Additionally aerial photograph and airborne laserscan interpretation has been used to create land use maps. These maps have been integrated to a numerical DEM-based spatial model in order to get an impression of the variability of sediment input rates to the river system. It is hypothesized that this variability is primarily caused by different land use conditions. Finally river bed sites affected by river engineering structures have been probed and grain size distributions have been analyzed. With these data sedimentological and ecological/ecomorphological effects of various river engineering structures (i.e. dams, weirs, river bank- and river bed protection works) on river bed sediment composition and on limnic habitats are evaluated. First results reveal that 'land use' is a dominant factor concerning river bed sediment composition and limnic habitat conditions. Further outcomes will be presented on European Geosciences Union General Assembly, 2010.
Flood trends and river engineering on the Mississippi River system
Pinter, N.; Jemberie, A.A.; Remo, J.W.F.; Heine, R.A.; Ickes, B.S.
2008-01-01
Along >4000 km of the Mississippi River system, we document that climate, land-use change, and river engineering have contributed to statistically significant increases in flooding over the past 100-150 years. Trends were tested using a database of >8 million hydrological measurements. A geospatial database of historical engineering construction was used to quantify the response of flood levels to each unit of engineering infrastructure. Significant climate- and/or land use-driven increases in flow were detected, but the largest and most pervasive contributors to increased flooding on the Mississippi River system were wing dikes and related navigational structures, followed by progressive levee construction. In the area of the 2008 Upper Mississippi flood, for example, about 2 m of the flood crest is linked to navigational and flood-control engineering. Systemwide, large increases in flood levels were documented at locations and at times of wing-dike and levee construction. Copyright 2008 by the American Geophysical Union.
25 Years Later: A History of the McClellan-Kerr Arkansas River Navigation System in Arkansas
1995-01-01
and Clements, ’’Arkansas River ... Sediment Control," chap. 18, pp. 15-16; Ronald A. Antonino , "The Arkansas River Project," Civil Engineering (Dec...March 8, 1989. Secondary Sources Antonino , Ronald A. "The Arkansas River Project," Civil Engineering (Dec. 1969): 44- 49. Arnold, Morris S
NASA Technical Reports Server (NTRS)
Oliver, Michael J.
2014-01-01
The Propulsion Systems Laboratory (PSL) is an existing altitude simulation jet engine test facility located at NASA Glenn Research Center in Cleveland, OH. It was modified in 2012 with the integration of an ice crystal cloud generation system. This paper documents the inaugural ice crystal cloud test in PSL--the first ever full scale, high altitude ice crystal cloud turbofan engine test to be conducted in a ground based facility. The test article was a Lycoming ALF502-R5 high bypass turbofan engine, serial number LF01. The objectives of the test were to validate the PSL ice crystal cloud calibration and engine testing methodologies by demonstrating the capability to calibrate and duplicate known flight test events that occurred on the same LF01 engine and to generate engine data to support fundamental and computational research to investigate and better understand the physics of ice crystal icing in a turbofan engine environment while duplicating known revenue service events and conducting test points while varying facility and engine parameters. During PSL calibration testing it was discovered than heated probes installed through tunnel sidewalls experienced ice buildup aft of their location due to ice crystals impinging upon them, melting and running back. Filtered city water was used in the cloud generation nozzle system to provide ice crystal nucleation sites. This resulted in mineralization forming on flow path hardware that led to a chronic degradation of performance during the month long test. Lacking internal flow path cameras, the response of thermocouples along the flow path was interpreted as ice building up. Using this interpretation, a strong correlation between total water content (TWC) and a weaker correlation between median volumetric diameter (MVD) of the ice crystal cloud and the rate of ice buildup along the instrumented flow path was identified. For this test article the engine anti-ice system was required to be turned on before ice crystal icing would occur. The ice crystal icing event, an uncommanded reduction in thrust, was able to be turned on and off by manipulating cloud TWC. A flight test point where no ice crystal icing event occurred was also duplicated in PSL. Physics based computational tools were successfully used to predict tunnel settings to induce ice buildup along the low pressure compression system flow path for several test points at incrementally lower altitudes, demonstrating that development of ice crystal icing scaling laws is potentially feasible. Analysis of PSL test data showed that uncommanded reduction in thrust occurs during ice crystal cloud on operation prior to fan speed reduction. This supports previous findings that the reduction of thrust for this test article is due to ice buildup leading to a restricted airflow from either physical or aerodynamic blockage in the engine core flow path.
NASA Technical Reports Server (NTRS)
Oliver, Michael J.
2014-01-01
The Propulsion Systems Laboratory (PSL) is an existing altitude simulation jet engine test facility located at NASA Glenn Research Center in Clevleand, OH. It was modified in 2012 with the integration of an ice crystal cloud generation system. This paper documents the inaugural ice crystal cloud test in PSLthe first ever full scale, high altitude ice crystal cloud turbofan engine test to be conducted in a ground based facility. The test article was a Lycoming ALF502-R5 high bypass turbofan engine, serial number LF01. The objectives of the test were to validate the PSL ice crystal cloud calibration and engine testing methodologies by demonstrating the capability to calibrate and duplicate known flight test events that occurred on the same LF01 engine and to generate engine data to support fundamental and computational research to investigate and better understand the physics of ice crystal icing in a turbofan engine environment while duplicating known revenue service events and conducting test points while varying facility and engine parameters. During PSL calibration testing it was discovered than heated probes installed through tunnel sidewalls experienced ice buildup aft of their location due to ice crystals impinging upon them, melting and running back. Filtered city water was used in the cloud generation nozzle system to provide ice crystal nucleation sites. This resulted in mineralization forming on flow path hardware that led to a chronic degradation of performance during the month long test. Lacking internal flow path cameras, the response of thermocouples along the flow path was interpreted as ice building up. Using this interpretation, a strong correlation between total water content (TWC) and a weaker correlation between median volumetric diameter (MVD) of the ice crystal cloud and the rate of ice buildup along the instrumented flow path was identified. For this test article the engine anti-ice system was required to be turned on before ice crystal icing would occur. The ice crystal icing event, an uncommanded reduction in thrust, was able to be turned on and off by manipulating cloud TWC. A flight test point where no ice crystal icing event occurred was also duplicated in PSL. Physics based computational tools were successfully used to predict tunnel settings to induce ice buildup along the low pressure compression system flow path for several test points at incrementally lower altitudes, demonstrating that development of ice crystal icing scaling laws is potentially feasible. Analysis of PSL test data showed that uncommanded reduction in thrust occurs during ice crystal cloud on operation prior to fan speed reduction. This supports previous findings that the reduction of thrust for this test article is due to ice buildup leading to a restricted airflow from either physical or aerodynamic blockage in the engine core flow path.
16. Photocopy of Engineering Drawing (original in Engineering News, 4 ...
16. Photocopy of Engineering Drawing (original in Engineering News, 4 October 1890. p. 292), delineator unknown. Scales indicate height in feet above sea level. The gradient in the middle section of the tunnel is incorrectly labeled 1 in 100, whereas the correct gradient is 1 in 1,000. VIEW NORTH, PROFILE OF PART OF ST. CLAIR TUNNEL UNDER RIVER SHOWING SECTION OF RIVER BED AS DETERMINED BY BORINGS, 1890. - St. Clair Tunnel, Under St. Clair River between Port Huron, MI, & Sarnia, ON, Canada, Port Huron, St. Clair County, MI
33 CFR 211.7 - Rights which may be granted by Division and District Engineers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WITH CIVIL WORKS PROJECTS Temporary Use by Others of Civil Works Real Estate § 211.7 Rights which may.... Division Engineers, the President of the Mississippi River Commission, and District Engineers of districts... of the Mississippi River Commission in granting leases and District Engineers will administer the...
NASA Technical Reports Server (NTRS)
Oliver, Michael J.
2014-01-01
The National Aeronautics and Space Administration (NASA) conducted a full scale ice crystal icing turbofan engine test using an obsolete Allied Signal ALF502-R5 engine in the Propulsion Systems Laboratory (PSL) at NASA Glenn Research Center. The test article used was the exact engine that experienced a loss of power event after the ingestion of ice crystals while operating at high altitude during a 1997 Honeywell flight test campaign investigating the turbofan engine ice crystal icing phenomena. The test plan included test points conducted at the known flight test campaign field event pressure altitude and at various pressure altitudes ranging from low to high throughout the engine operating envelope. The test article experienced a loss of power event at each of the altitudes tested. For each pressure altitude test point conducted the ambient static temperature was predicted using a NASA engine icing risk computer model for the given ambient static pressure while maintaining the engine speed.
Nakata, Paul A
2015-01-01
The establishment of new approaches to control chewing insects has been sought not only for direct use in reducing crop loss but also in managing resistance to the pesticides already in use. Engineered formation of calcium oxalate crystals is a potential strategy that could be developed to fulfill both these needs. As a step toward this development, this study investigates the effects of transforming a non-calcium oxalate crystal accumulating plant, Arabidopsis thaliana, into a crystal accumulating plant. Calcium oxalate crystal accumulating A. thaliana lines were generated by ectopic expression of a single bacterial gene encoding an oxalic acid biosynthetic enzyme. Biochemical and cellular studies suggested that the engineered A. thaliana lines formed crystals of calcium oxalate in a manner similar to naturally occurring crystal accumulating plants. The amount of calcium oxalate accumulated in leaves also reached levels similar to those measured in the leaves of Medicago truncatula in which the crystals are known to play a defensive role. Visual inspection of the different engineered lines, however, suggested a phenotypic consequence on plant growth and development with higher calcium oxalate concentrations. The restoration of a near wild-type plant phenotype through an enzymatic reduction of tissue oxalate supported this observation. Overall, this study is a first to provide initial insight into the potential consequences of engineering calcium oxalate crystal formation in non-crystal accumulating plants.
Code of Federal Regulations, 2010 CFR
2010-07-01
... within the regulated navigation area and: (i) Sustained winds are greater than 25 knots but less than 40 knots, ensure the main engines are ready to provide full power in five minutes or less; and (ii) Sustained winds are 40 knots or over, ensure that the main engines are on line to immediately provide...
Code of Federal Regulations, 2012 CFR
2012-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2011 CFR
2011-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2014 CFR
2014-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2013 CFR
2013-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2010 CFR
2010-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Methods for Neutron Spectrometry
DOE R&D Accomplishments Database
Brockhouse, Bertram N.
1961-01-09
The appropriate theories and the general philosophy of methods of measurement and treatment of data neutron spectrometry are discussed. Methods of analysis of results for liquids using the Van Hove formulation, and for crystals using the Born-von Karman theory, are reviewed. The most useful of the available methods of measurement are considered to be the crystal spectrometer methods and the pulsed monoenergetic beam/time-of-flight method. Pulsed-beam spectrometers have the advantage of higher counting rates than crystal spectrometers, especially in view of the fact that simultaneous measurements in several counters at different angles of scattering are possible in pulsed-beam spectrometers. The crystal spectrometer permits several valuable new types of specialized experiments to be performed, especially energy distribution measurements at constant momentum transfer. The Chalk River triple-axis crystal-spectrometer is discussed, with reference to its use in making the specialized experiments. The Chalk River rotating crystal (pulsed-beam) spectrometer is described, and a comparison of this type instrument with other pulsed-beam spectrometers is made. A partial outline of the theory of operation of rotating-crystal spectrometers is presented. The use of quartz-crystal filters for fast neutron elimination and for order elimination is discussed. (auth)
Habersack, Helmut; Hein, Thomas; Stanica, Adrian; Liska, Igor; Mair, Raimund; Jäger, Elisabeth; Hauer, Christoph; Bradley, Chris
2016-02-01
In the Danube River Basin multiple pressures affect the river system as a consequence of river engineering works, altering both the river hydrodynamics and morphodynamics. The main objective of this paper is to identify the effects of hydropower development, flood protection and engineering works for navigation on the Danube and to examine specific impacts of these developments on sediment transport and river morphology. Whereas impoundments are characterised by deposition and an excess of sediment with remobilisation of fine sediments during severe floods, the remaining five free flowing sections of the Danube are experiencing river bed erosion of the order of several centimetres per year. Besides the effect of interruption of the sediment continuum, river bed degradation is caused by an increase in the sediment transport capacity following an increase in slope, a reduction of river bed width due to canalisation, prohibition of bank erosion by riprap or regressive erosion following base level lowering by flood protection measures and sediment dredging. As a consequence, the groundwater table is lowered, side-arms are disconnected, instream structures are lost and habitat quality deteriorates affecting the ecological status of valuable floodplains. The lack of sediments, together with cutting off meanders, leads also to erosion of the bed of main arms in the Danube Delta and coastal erosion. This paper details the causes and effects of river engineering measures and hydromorphological changes for the Danube. It highlights the importance of adopting a basin-wide holistic approach to river management and demonstrates that past management in the basin has been characterised by a lack of integration. To-date insufficient attention has been paid to the wide-ranging impacts of river engineering works throughout the basin: from the basin headwaters to the Danube Delta, on the Black Sea coast. This highlights the importance of new initiatives that seek to advance knowledge exchange and knowledge transfer within the basin to reach the goal of integrated basin management. Copyright © 2015 Elsevier B.V. All rights reserved.
Sai Gouthami, Kodukula; Kumar, Dinesh; Thipparaboina, Rajesh; Chavan, Rahul B; Shastri, Nalini R
2015-08-01
Improvement in dissolution of the drugs having poor solubility is a challenge in pharmaceutical industry. Micronization is one technique, employed for dissolution enhancement of cilostazol, a BCS class II drug. However, the obtained micronized drug possesses poor flowability. The aim of this study was to improve the dissolution rate and flow properties of cilostazol by crystal engineering, using habit modification method and compare with micronized cilostazol bulk drug. Simulation studies were performed to predict the effect of solvents on cilostazol crystal habit. Cilostazol crystals with different habits were prepared by solvent:anti-solvent crystallization technique. SEM, FTIR, DSC, TGA and PXRD were used for solid state characterization. The results revealed that cilostazol re-crystallized from methanol-hexane system were hexagonal and ethanol-hexane system gave rods. Cilostazol engineered habits showed increased dissolution rate than unprocessed drug but similar dissolution rate when compared to micronized cilostazol. Micronized cilostazol showed a dissolution efficiency of 75.58% where as cilostazol recrystallized from methanol-hexane and ethanol-hexane systems resulted in a dissolution efficiency of 72.63% and 68.63%, respectively. In addition, crystal engineering resulted in improved flow properties of re-crystallized habits when compared to micronized form of the drug. In conclusion, crystal engineering by habit modification show potential for dissolution enhancement with an added advantage of improved flow properties over micronization technique, for poorly soluble drugs like cilostazol. Copyright © 2015 Elsevier B.V. All rights reserved.
2016-05-27
often discussed in the field of thermosetting materials, crystal engineering1-4 plays a key role in facilitating the successful utilization of these...not to alter the desirable properties of the polymerized networks. Fortunately, the field of crystal engineering provides examples where even very...Chickos and Acree.26 For molecular modeling, methods ranging from atomistic simulations with semi-empirical force fields to density functional
Sea Level Operation Demonstration of F404-GE-400 Turbofan Engine with JP-5/Bio-Fuel Mixture
2010-03-30
Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test consisted of two separate...turbofan engine inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test...turbofan engine (ESN 310810) inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station (NAS) Patuxent River, Maryland, on 13
MESA/MEP at American River College: Year One Evaluation Report.
ERIC Educational Resources Information Center
Lee, Beth S.; And Others
In 1989, the Mathematics, Engineering, and Science Achievement (MESA)/Minority Engineering Program (MEP) was initiated at American River College. The MESA/MEP program recruits Black, Hispanic, and Native American students and provides assistance, encouragement, and enrichment programs to help them succeed in the fields of mathematics, engineering,…
NASA Technical Reports Server (NTRS)
Oliver, Michael J.
2015-01-01
The National Aeronautics and Space Administration conducted a full scale ice crystal icing turbofan engine test in the NASA Glenn Research Centers Propulsion Systems Laboratory (PSL) Facility in February 2013. Honeywell Engines supplied the test article, an obsolete, unmodified Lycoming ALF502-R5 turbofan engine serial number LF01 that experienced an un-commanded loss of thrust event while operating at certain high altitude ice crystal icing conditions. These known conditions were duplicated in the PSL for this testing.
Roseau River Subbasin, Red River of the North Reconnaissance Report.
1980-12-01
river. It was found that much of the area was used -,- .for agricultural purposes (cropland and pasture). A narrow corridor € .of woodlands, sometimes... corridor through disturbed (e.g. cropland) areas. The forested areas afford habitats for a greater variety of wildlife than any other major habitat type in...listing as a Federally protected species (U.S. Army Corps of Engineers, 1975; U.S. Fish and Wildife Service, 1980; International Roseau River Engineering
Columbia River System Analysis Model - Phase 1
1991-10-01
Reach reservoirs due to the impact of APPENDIX D 6 Wenatchee River flows and additional inflow downstream of Rocky Reach. An inflow link terminates at...AD-A246 639I 11 11111 till11 1 111 US Army Corps of Engineers Hydrologic Engineering Center Columbia River System Analysis Model - Phase I Libby...WORK UNIT ELEMENT NO. NO. NO. ACCESSION NO. 11. TITLE (Include Security Classification) Columbia River System Analysis - Phase I 12. PERSONAL AUTHOR(S
NASA Astrophysics Data System (ADS)
Xu, Y. J.
2016-02-01
Dujiangyan, also known as the Dujiangyan Project, is a hydraulic engineering complex built more than 2260 years ago on the Mingjiang River near Chengdu in China's Sichuan Province. The complex splits the river into two channels, a so-called "inner river" (Leijiang) and an "outer river" (Waijiang) that carry variable water volumes and sediment loads under different river flow conditions. The inner river and its numerous distributary canals are primarily man-made for irrigation over the past 2000 years, while the outer river is the natural channel and flows southward before entering into the Yangtze River. Under normal flow, 60% of the Mingjiang River goes into the inner river for irrigating nearly 1 million hectares of agricultural land on the Chengdu plain. During floods, however, less than 40% of the Mingjiang River flows into the inner river. Under both flow conditions, about 80% of the riverine sediments is carried by the outer river and continues downstream. This hydrology is achieved through a weir work complex that comprises three major components: a V-shaped bypass dike in the center of the Mingjiang River (the Yuzui Bypass Dike, see photo below), a sediment diversion canal in the inner river below the bypass dike (the Feishayan Floodgate), and a flow control in the inner river below the sediment diversion canal (the Baopingkou Diversion Passage). Together with ancillary embankments, these structures have not only ensured a regular supply of silt-reduced water to the fertile Chengdu plain, but have provided great benefits in flood control, sediment transport, and water resources regulation over the past two thousand years. The design of this ancient hydraulic complex ingeniously conforms to the natural environment while incorporating many sophisticated techniques, reflecting the concept that humankind is an integral part of nature. As we are urgently seeking solutions today to save the sinking Mississippi River Delta, examination of the ancient engineering marvel may offer insights into sustainable practices in river engineering of the lower Mississippi under climate change and sea level rise. This paper will introduce the Dujiangyan Project and will discuss possibilities of applying Dujiangyan's fundamental concept for sediment diversions in the Lower Mississippi River.
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) ...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) STRESS DIAGRAM - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Quality of water of the Colorado River in 1928-1930
Howard, C.S.
1932-01-01
This report gives the results obtained in the continuation of a study of the Colorado River begun in 1925.1 The analyses represent composites of daily samples collected by the observers at the gaging stations on the Colorado River at Cisco, Utah, and Lees Ferry and Grand Canyon, Ariz.; on the Green River at Green River, Utah; and on the San Juan River near Bluff, Utah. Analyses are given for samples collected about once a month from the Williams River at Planet, Ariz. The Arizona stations are operated under the direction of W. E. Dickinson, district engineer of the Geological Survey at Tucson, Ariz., and the Utah stations under the direction of A. B. Purton, district engineer of the Geological Survey at Salt Lake City, Utah. The average discharges given in Table 3 were calculated from data furnished by these district engineers. Complete discharge . data for this period will be published in the regular series of water-supply papers.
Saha, Subhankar; Desiraju, Gautam R
2017-04-06
Designing elastic crystals is a difficult task and is of relevance in potential applications from materials to biology. Here, multi-step crystal engineering based on σ-hole and π-hole synthon mimicry is performed to obtain binary organic molecular crystals with a high degree of flexibility. A structural model is proposed based only on σ-hole-oriented type-II halogen bonds with their characteristic orthogonal geometry. These σ-hole contacts are then partly replaced by chemically and geometrically similar π-hole synthons to obtain new crystals in the second step. In the final step, all the σ-hole interactions are replaced with π-hole interactions and elastic crystals of non-halogenated compounds are obtained. All the crystals obtained according to our protocols are found to be elastic. When crystals that do not conform to the desired structure type appeared, they were found to be brittle. This underlines the role of orthogonal-type interactions, whether they are of the σ-hole or π-hole type, in achieving elasticity. This is the first report in which π-hole interactions are used for property engineering. This example may illustrate a new generation of crystal engineering in which a particular property is associated more with topological rather than chemical attributes, although the significance of the latter cannot be completely excluded. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, ...
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, Seattle) STRESS SHEET - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Preliminary Evaluation of Altitude Scaling for Turbofan Engine Ice Crystal Icing
NASA Technical Reports Server (NTRS)
Tsao, Jen-Ching
2017-01-01
Preliminary evaluation of altitude scaling for turbofan engine ice crystal icing simulation was conducted during the 2015 LF11 engine icing test campaign in PSL.The results showed that a simplified approach for altitude scaling to simulate the key reference engine ice growth feature and associated icing effects to the engine is possible. But special considerations are needed to address the facility operation limitation for lower altitude engine icing simulation.
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, project location and index - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, lining details at Hinckston Run - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, February 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
44. LOCK, ELECTRICAL SYSTEM, HAULAGE ENGINES, ELECTRICAL DETAILS AND LOCATION. ...
44. LOCK, ELECTRICAL SYSTEM, HAULAGE ENGINES, ELECTRICAL DETAILS AND LOCATION. February 1938 - Mississippi River 9-Foot Channel Project, Lock & Dam No. 17, Upper Mississippi River, New Boston, Mercer County, IL
Desborough, G.A.; Foord, E.E.
1992-01-01
A mineral with the approximate composition of Au94Hg6 - Au88Hg12 (atomic %) has been identified in Pleistocene Snake River alluvial deposits. The gold-mercury mineral occurs as very small grains or as polycrystalline masses composed of subhedral to nearly euhedral attached crystals. Vibratory cold-polishing techniques with 0.05-??m alumina abrasive for polished sections revealed a porous internal texture for most subhedral crystals after 48-72 hours of treatment. Thus, optical character (isotropic or anisotropic) could not be determined by reflected-light microscopy, and pore-free areas were too small for measurement of reflectance. X-ray-diffraction lines rather than individual reflections (spots), on powder camera X-ray films of unrotated spindles of single grains that morphologically appear to be single crystals, indicate that individual subhedral or euhedral crystals are composed of domains in random orientation. Thus, no material was found suitable for single-crystal X-ray diffraction studies. -from Authors
8. Historic photo taken during construction of the Lost River ...
8. Historic photo taken during construction of the Lost River Diversion Dam and House. Labeled as follows, 'View showing walk construction North side. Group in foreground, left to right: - J.M. McLean, I.S. Voorhees, Asst Eng'r, A.B. Clevland, engineer... W.W. Patch, Project Engineer.' Negative # 95. Facing east. - Klamath Basin Project, Lost River Diversion Dam House, Lost River near intersection of State Highway 140 & Hill Road, Klamath Falls, Klamath County, OR
Publications - RI 97-15D | Alaska Division of Geological & Geophysical
Tidal Datum Portal Climate and Cryosphere Hazards Coastal Hazards Program Guide to Geologic Hazards in Coastal and River; Coastal and River Hazards; Construction Materials; Derivative; Engineering; Engineering
SECONDARY GENERAL MOTORS DIESEL ENGINE WITH CONNECTION TO REDUCTION GEAR ...
SECONDARY GENERAL MOTORS DIESEL ENGINE WITH CONNECTION TO REDUCTION GEAR BELT DRIVE SYSTEM, LOOKING SOUTH. - Mad River Glen, Single Chair Ski Lift, 62 Mad River Glen Resort Road, Fayston, Washington County, VT
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 1, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of construction downstream at STA. 152+50 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 8, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Stone Arch Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 8, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view upstream from Bethlehem steel footbridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of stadium upstream from point bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July 23, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view downstream from RB STA. 144+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, lining details and typical sections of invert - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, August 22, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream at STA. 40+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of construction downstream at First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 4, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, control weir at STA. 7+00-Little Conemaugh - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, August 22, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view upstream from point stadium - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view downstream from Walnut Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 7, 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general view at Dornick Point - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view downstream from Coopersdale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view upstream from prospect viaduct - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of Solomon Run Outlet, looking north - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view upstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July 18, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream at Walnut Street - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view of work area, looking downstream - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 26, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general view upstream at Dornick Point - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Point Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 18, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view from Coopersdale Bridge ramp - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream toward ten acre railroad bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view downstream from Horner Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of weir at point, looking southeast - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army,February 17, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream STA. 40+75 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July, 11, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from incline bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Kalyoncu, Sibel; Hyun, Jeongmin; Pai, Jennifer C.; Johnson, Jennifer L.; Entzminger, Kevin; Jain, Avni; Heaner, David P.; Morales, Ivan A.; Truskett, Thomas M.; Maynard, Jennifer A.; Lieberman, Raquel L.
2014-01-01
Protein crystallization is dependent upon, and sensitive to, the intermolecular contacts that assist in ordering proteins into a three dimensional lattice. Here we used protein engineering and mutagenesis to affect the crystallization of single chain antibody fragments (scFvs) that recognize the EE epitope (EYMPME) with high affinity. These hypercrystallizable scFvs are under development to assist difficult proteins, such as membrane proteins, in forming crystals, by acting as crystallization chaperones. Guided by analyses of intermolecular crystal lattice contacts, two second-generation anti-EE scFvs were produced, which bind to proteins with installed EE tags. Surprisingly, although non-complementarity determining region (CDR) lattice residues from the parent scFv framework remained unchanged through the processes of protein engineering and rational design, crystal lattices of the derivative scFvs differ. Comparison of energy calculations and the experimentally-determined lattice interactions for this basis set provides insight into the complexity of the forces driving crystal lattice choice and demonstrates the availability of multiple well-ordered surface features in our scFvs capable of forming versatile crystal contacts. PMID:24615866
ROBOTICS IN HAZARDOUS ENVIRONMENTS - REAL DEPLOYMENTS BY THE SAVANNAH RIVER NATIONAL LABORATORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriikku, E.; Tibrea, S.; Nance, T.
The Research & Development Engineering (R&DE) section in the Savannah River National Laboratory (SRNL) engineers, integrates, tests, and supports deployment of custom robotics, systems, and tools for use in radioactive, hazardous, or inaccessible environments. Mechanical and electrical engineers, computer control professionals, specialists, machinists, welders, electricians, and mechanics adapt and integrate commercially available technology with in-house designs, to meet the needs of Savannah River Site (SRS), Department of Energy (DOE), and other governmental agency customers. This paper discusses five R&DE robotic and remote system projects.
Sun, Sand and Water: A History of the Jacksonville District U.S. Army Corps of Engineers 1821-1975
1981-01-01
plan envisioned a dredged cut through the barrier beach to Banana River. On the river there would be a turning basin with terminal facilities, and...intracoastal canal to the west This canal would cut through Merritt Island, which separated Indian River from Banana River.6 District Engineer, Colonel...canal, guarded by two jetties, through the barrier land from the 27 -foot contour line in the Atlantic to a 27 -foot turning basin in the Banana
Modeling Commercial Turbofan Engine Icing Risk With Ice Crystal Ingestion
NASA Technical Reports Server (NTRS)
Jorgenson, Philip C. E.; Veres, Joseph P.
2013-01-01
The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion, partially melting, and ice accretion on the compression system components. The result was degraded engine performance, and one or more of the following: loss of thrust control (roll back), compressor surge or stall, and flameout of the combustor. As ice crystals are ingested into the fan and low pressure compression system, the increase in air temperature causes a portion of the ice crystals to melt. It is hypothesized that this allows the ice-water mixture to cover the metal surfaces of the compressor stationary components which leads to ice accretion through evaporative cooling. Ice accretion causes a blockage which subsequently results in the deterioration in performance of the compressor and engine. The focus of this research is to apply an engine icing computational tool to simulate the flow through a turbofan engine and assess the risk of ice accretion. The tool is comprised of an engine system thermodynamic cycle code, a compressor flow analysis code, and an ice particle melt code that has the capability of determining the rate of sublimation, melting, and evaporation through the compressor flow path, without modeling the actual ice accretion. A commercial turbofan engine which has previously experienced icing events during operation in a high altitude ice crystal environment has been tested in the Propulsion Systems Laboratory (PSL) altitude test facility at NASA Glenn Research Center. The PSL has the capability to produce a continuous ice cloud which are ingested by the engine during operation over a range of altitude conditions. The PSL test results confirmed that there was ice accretion in the engine due to ice crystal ingestion, at the same simulated altitude operating conditions as experienced previously in flight. The computational tool was utilized to help guide a portion of the PSL testing, and was used to predict ice accretion could also occur at significantly lower altitudes. The predictions were qualitatively verified by subsequent testing of the engine in the PSL. The PSL test has helped to calibrate the engine icing computational tool to assess the risk of ice accretion. The results from the computer simulation identified prevalent trends in wet bulb temperature, ice particle melt ratio, and engine inlet temperature as a function of altitude for predicting engine icing risk due to ice crystal ingestion.
78 FR 70851 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-27
... crystal icing (ICI) conditions at high altitudes, and to prohibit operation in moderate and severe ICI... temporary engine thrust loss, and other engine-related events that occurred in ice crystal icing (ICI... conditions that included ice crystal icing. This type of icing does not appear on radar due to its low...
17. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ENGINEERS ...
17. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ENGINEERS EXAMINING MODEL PUMPS, VIEW FROM MODEL BED. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
Design considerations for a Space Shuttle Main Engine turbine blade made of single crystal material
NASA Technical Reports Server (NTRS)
Abdul-Aziz, A.; August, R.; Nagpal, V.
1993-01-01
Nonlinear finite-element structural analyses were performed on the first stage high-pressure fuel turbopump blade of the Space Shuttle Main Engine. The analyses examined the structural response and the dynamic characteristics at typical operating conditions. Single crystal material PWA-1480 was considered for the analyses. Structural response and the blade natural frequencies with respect to the crystal orientation were investigated. The analyses were conducted based on typical test stand engine cycle. Influence of combined thermal, aerodynamic, and centrifugal loadings was considered. Results obtained showed that the single crystal secondary orientation effects on the maximum principal stresses are not highly significant.
DISC BRAKE SYSTEM (CENTER), INCLUDING BELT DRIVE TO SECONDARY GENERAL ...
DISC BRAKE SYSTEM (CENTER), INCLUDING BELT DRIVE TO SECONDARY GENERAL MOTORS ENGINE (LEFT)AND FERREL REDUCTION GEAR CONNECTION TO ALLIS-CHALMERS DIESEL ENGINE (RIGHT), LOOKING NORTH. NOTE TORQUE CONVERTER (TOP) AND THROTTLE (BELOW) LINES CONNECTING TO PRIMARY ENGINE. - Mad River Glen, Single Chair Ski Lift, 62 Mad River Glen Resort Road, Fayston, Washington County, VT
Taweel, Abdulali; Shuhaimi-Othman, M; Ahmad, A K
2013-07-01
Concentrations of the heavy metals copper (Cu), cadmium (Cd), zinc (Zn), lead (Pb) and nickel (Ni) were determined in the liver, gills and muscles of tilapia fish from the Langat River and Engineering Lake, Bangi, Selangor, Malaysia. There were differences in the concentrations of the studied heavy metals between different organs and between sites. In the liver samples, Cu>Zn>Ni>Pb>Cd, and in the gills and muscle, Zn>Ni>Cu>Pb>Cd. Levels of Cu, Cd, Zn and Pb in the liver samples from Engineering Lake were higher than in those from the Langat River, whereas the Ni levels in the liver samples from the Langat River were greater than in those from Engineering Lake. Cd levels in the fish muscle from Engineering Lake were lower than in that from the Langat River. Meanwhile, the Cd, Zn and Pb levels in the fish muscle from the Langat River were lower than in that from Engineering Lake, and the Ni levels were almost the same in the fish muscle samples from the two sites. The health risks associated with Cu, Cd, Zn, Pb and Ni were assessed based on the target hazard quotients. In the Langat River, the risk from Cu is minimal compared to the other studied elements, and the concentrations of Pb and Ni were determined to pose the greatest risk. The maximum allowable fish consumption rates (kg/d) based on Cu in Engineering Lake and the Langat River were 2.27 and 1.51 in December and 2.53 and 1.75 in February, respectively. The Cu concentrations resulted in the highest maximum allowable fish consumption rates compared with the other studied heavy metals, whereas those based on Pb were the lowest. A health risk analysis of the heavy metals measured in the fish muscle samples indicated that the fish can be classified at one of the safest levels for the general population and that there are no possible risks pertaining to tilapia fish consumption. Copyright © 2013 Elsevier Inc. All rights reserved.
An Overview of NASA Engine Ice-Crystal Icing Research
NASA Technical Reports Server (NTRS)
Addy, Harold E., Jr.; Veres, Joseph P.
2011-01-01
Ice accretions that have formed inside gas turbine engines as a result of flight in clouds of high concentrations of ice crystals in the atmosphere have recently been identified as an aviation safety hazard. NASA s Aviation Safety Program (AvSP) has made plans to conduct research in this area to address the hazard. This paper gives an overview of NASA s engine ice-crystal icing research project plans. Included are the rationale, approach, and details of various aspects of NASA s research.
Slone, Daniel H.; Butler, Susan M.; Reid, James P.; Haase, Catherine G.
2017-11-21
Managers at the U.S. Fish and Wildlife Service Crystal River National Wildlife Refuge (CRNWR) desire to update their management plan regarding the operation of select springs including Three Sisters Springs. They wish to refine existing parameters used to predict the presence of federally threatened Trichechus manatus latirostris (Florida manatee) in the springs and thereby improve their manatee management options. The U.S. Geological Survey Sirenia Project has been tracking manatees in the CRNWR area since 2006 with floating Global Positioning System (GPS) satellite-monitored telemetry tags. Analyzing movements of these tagged manatees will provide valuable insight into their habitat use patterns.A total of 136 GPS telemetry bouts were available for this project, representing 730,009 locations generated from 40 manatees tagged in the Gulf of Mexico north of Tampa, Florida. Dates from October through March were included to correspond to the times that cold ambient temperatures were expected, thus requiring a need for manatee thermoregulation and a physiologic need for warm water. Water level (tide) and water temperatures were obtained for the study from Salt River, Crystal River mouth, Bagley Cove, Kings Bay mouth, and Magnolia Spring. Polygons were drawn to subdivide the manatee locations into areas around the most-used springs (Three Sisters/Idiots Delight, House/Hunter/Jurassic, Magnolia and King), Kings Bay, Crystal/Salt Rivers and the Gulf of Mexico.Manatees were found in the Crystal or Salt Rivers or in the Gulf of Mexico when ambient temperatures were warmer (>20 °C), while they were found in or near the springs (especially Three Sisters Springs) at colder ambient water temperatures. There was a trend of manatees entering springs early in the morning and leaving in the afternoon. There was a strong association of manatee movements in and out of the Three Sisters/Idiots Delight polygon with tide cycles: manatees were more likely to enter the Three Sisters/Idiots Delight polygon on an incoming tide, and leave the polygon on an outgoing tide. Both movement directions were associated with midtide. Future analysis will incorporate human activity and a finer spatial scale, including movements between Three Sisters Springs and Idiots Delight and nearby canals.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 23, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view of channel excavation downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army,February 17, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, plan and profile, STA. 15+00 to STA. 24+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of WPA masonry wall and dike upstream from Central Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 23, 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, section of wall in progress, looking downstream from lb STA. 43+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 3, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of Solomon Run, looking north, RB STA. 135+25 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, February 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, cross sections, STA. 96+52.0 to STA. 101+53.5 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 24, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of channel excavation upstream at Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Alexander, Jason S.; Wilson, Richard C.; Green, W. Reed
2012-01-01
The U.S. Geological Survey Forecast Mekong project is providing technical assistance and information to aid management decisions and build science capacity of institutions in the Mekong River Basin. A component of this effort is to produce a synthesis of the effects of dams and other engineering structures on large-river hydrology, sediment transport, geomorphology, ecology, water quality, and deltaic systems. The Mississippi River Basin (MRB) of the United States was used as the backdrop and context for this synthesis because it is a continental scale river system with a total annual water discharge proportional to the Mekong River, has been highly engineered over the past two centuries, and the effects of engineering have been widely studied and documented by scientists and engineers. The MRB is controlled and regulated by dams and river-engineering structures. These modifications have resulted in multiple benefits including navigation, flood control, hydropower, bank stabilization, and recreation. Dams and other river-engineering structures in the MRB have afforded the United States substantial socioeconomic benefits; however, these benefits also have transformed the hydrologic, sediment transport, geomorphic, water-quality, and ecologic characteristics of the river and its delta. Large dams on the middle Missouri River have substantially reduced the magnitude of peak floods, increased base discharges, and reduced the overall variability of intraannual discharges. The extensive system of levees and wing dikes throughout the MRB, although providing protection from intermediate magnitude floods, have reduced overall channel capacity and increased flood stage by up to 4 meters for higher magnitude floods. Prior to major river engineering, the estimated average annual sediment yield of the Mississippi River Basin was approximately 400 million metric tons. The construction of large main-channel reservoirs on the Missouri and Arkansas Rivers, sedimentation in dike fields, and protection of channel banks by revetments throughout the basin, have reduced the overall sediment yield of the MRB by more than 60 percent. The primary alterations to channel morphology by dams and other engineering projects have been (1) channel simplification and reduced dynamism; (2) lowering of channel-bed elevation; and (3) disconnection of the river channel from the flood plain, except during extreme flood events. Freshwater discharge from the Mississippi River and its associated sediment and nutrient loads strongly influence the physical and biological components in the northern Gulf of Mexico. Ninety percent of the nitrogen load reaching the Gulf of Mexico is from nonpoint sources with about 60 percent coming from fertilizer and mineralized soil nitrogen. Much of the phosphorus is from animal manure from pasture and rangelands followed by fertilizer applied to corn and soybeans. Increased nutrient enrichment in the northern Gulf of Mexico has resulted in the degradation of water quality as more phytoplankton grow, which increases turbidity and depletes oxygen in the lower depths creating what is known as the "dead zone." In 2002, the dead zone was 22,000 square kilometers (km2), an area similar to the size of the State of Massachusetts. Changes in the flow regime from engineered structures have had direct and indirect effects on the fish communities. The navigation pools in the upper Mississippi River have aged, and these overwintering habitats, which were created when the pools filled, have declined as sedimentation reduces water depth. Reproduction of paddlefish may have been adversely affected by dams, which impede access to suitable spawning habitats. Fishes that inhabit swift-current habitats in the unimpounded lower Mississippi River have not declined as much as in the upper Mississippi River. The decline of the pallid sturgeon may be attributable to channelization of the Missouri River above St. Louis, Missouri. The Missouri River supports a rich fish community and remains relatively intact. Nevertheless, the widespread and long history of human intervention in river discharge has contributed to the declines of about 25 percent of the species. The Mississippi River Delta Plain is built from six delta complexes composed of a massive area of coastal wetlands that support the largest commercial fishery in the conterminous United States. Since the early 20th century, approximately 4,900 km2 of coastal lands have been lost in Louisiana. One of the primary mechanisms of wetland loss on the Plaquemines-Balize complex is believed to be the disconnection of the river distributary network from the delta plain by the massive system of levees on the delta top, which prevent overbank flooding and replenishment of the delta top by sediment and nutrient deliveries. Efforts by Federal and State agencies to conserve and restore the Mississippi River Delta Plain began over three decades ago and have accelerated over the past decade. Regardless of these efforts, however, land losses are expected to continue because the reduced upstream sediment supplies are not sufficient to keep up with the projected depositional space being created by the combined forces of delta plain subsidence and global sea-level rise.
1. GENERAL VIEW FROM NORTH SIDE OF RIVER LOOKING SOUTHEAST ...
1. GENERAL VIEW FROM NORTH SIDE OF RIVER LOOKING SOUTHEAST OVER ENGINE REPAIR HOUSE, DINKY LEVELS VISIBLE IN DISTANCE - Harbison-Walker Refractories Company, Engine Repair House, West end of Shirley Street, Mount Union, Huntingdon County, PA
1. Photocopied from Photo 1645, Wheelon Station Folder #1, Engineering ...
1. Photocopied from Photo 1645, Wheelon Station Folder #1, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. UTAH SUGAR CO.'S DAM -- BEAR RIVER CANYON. - Irrigation Diversion Canal, Bear River, Fielding, Box Elder County, UT
Possible Mechanisms for Turbofan Engine Ice Crystal Icing at High Altitude
NASA Technical Reports Server (NTRS)
Tsao, Jen-Ching; Struk, Peter M.; Oliver, Michael
2014-01-01
A thermodynamic model is presented to describe possible mechanisms of ice formation on unheated surfaces inside a turbofan engine compression system from fully glaciated ice crystal clouds often formed at high altitude near deep convective weather systems. It is shown from the analysis that generally there could be two distinct types of ice formation: (1) when the "surface freezing fraction" is in the range of 0 to 1, dominated by the freezing of water melt from fully or partially melted ice crystals, the ice structure is formed from accretion with strong adhesion to the surface, and (2) when the "surface melting fraction" is the range of 0 to 1, dominated by the further melting of ice crystals, the ice structure is formed from accumulation of un-melted ice crystals with relatively weak bonding to the surface. The model captures important qualitative trends of the fundamental ice-crystal icing phenomenon reported earlier1,2 from the research collaboration work by NASA and the National Research Council (NRC) of Canada. Further, preliminary analysis of test data from the 2013 full scale turbofan engine ice crystal icing test3 conducted in the NASA Glenn Propulsion Systems Laboratory (PSL) has also suggested that (1) both types of ice formation occurred during the test, and (2) the model has captured some important qualitative trend of turning on (or off) the ice crystal ice formation process in the tested engine low pressure compressor (LPC) targeted area under different icing conditions that ultimately would lead to (or suppress) an engine core roll back (RB) event.
Possible Mechanisms for Turbofan Engine Ice Crystal Icing at High Altitude
NASA Technical Reports Server (NTRS)
Tsao, Jen-Ching; Struk, Peter M.; Oliver, Michael J.
2016-01-01
A thermodynamic model is presented to describe possible mechanisms of ice formation on unheated surfaces inside a turbofan engine compression system from fully glaciated ice crystal clouds often formed at high altitude near deep convective weather systems. It is shown from the analysis that generally there could be two distinct types of ice formation: (1) when the "surface freezing fraction" is in the range of 0 to 1, dominated by the freezing of water melt from fully or partially melted ice crystals, the ice structure is formed from accretion with strong adhesion to the surface, and (2) when the "surface melting fraction" is the range of 0 to 1, dominated by the further melting of ice crystals, the ice structure is formed from accumulation of un-melted ice crystals with relatively weak bonding to the surface. The model captures important qualitative trends of the fundamental ice-crystal icing phenomenon reported earlier (Refs. 1 and 2) from the research collaboration work by NASA and the National Research Council (NRC) of Canada. Further, preliminary analysis of test data from the 2013 full scale turbofan engine ice crystal icing test (Ref. 3) conducted in the NASA Glenn Propulsion Systems Laboratory (PSL) has also suggested that (1) both types of ice formation occurred during the test, and (2) the model has captured some important qualitative trend of turning on (or off) the ice crystal ice formation process in the tested engine low pressure compressor (LPC) targeted area under different icing conditions that ultimately would lead to (or suppress) an engine core roll back (RB) event.
NASA Technical Reports Server (NTRS)
Arakere, Nagaraj K.; Swanson, Gregory R.
2000-01-01
High Cycle Fatigue (HCF) induced failures in aircraft gas-turbine engines is a pervasive problem affecting a wide range of components and materials. HCF is currently the primary cause of component failures in gas turbine aircraft engines. Turbine blades in high performance aircraft and rocket engines are increasingly being made of single crystal nickel superalloys. Single-crystal Nickel-base superalloys were developed to provide superior creep, stress rupture, melt resistance and thermomechanical fatigue capabilities over polycrystalline alloys previously used in the production of turbine blades and vanes. Currently the most widely used single crystal turbine blade superalloys are PWA 1480/1493 and PWA 1484. These alloys play an important role in commercial, military and space propulsion systems. PWA1493, identical to PWA1480, but with tighter chemical constituent control, is used in the NASA SSME (Space Shuttle Main Engine) alternate turbopump, a liquid hydrogen fueled rocket engine. Objectives for this paper are motivated by the need for developing failure criteria and fatigue life evaluation procedures for high temperature single crystal components, using available fatigue data and finite element modeling of turbine blades. Using the FE (finite element) stress analysis results and the fatigue life relations developed, the effect of variation of primary and secondary crystal orientations on life is determined, at critical blade locations. The most advantageous crystal orientation for a given blade design is determined. Results presented demonstrates that control of secondary and primary crystallographic orientation has the potential to optimize blade design by increasing its resistance to fatigue crack growth without adding additional weight or cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
.... Army Corps of Engineers Locks, Sault Sainte Marie, MI AGENCY: Coast Guard, DHS. ACTION: Temporary final... Fireworks, St Mary's River, U.S. Army Corps of Engineers Locks, Sault Sainte Marie, MI; in the Federal... celebration, fireworks will be launched from the northeast pier of the U.S. Army Corp of Engineers Soo Locks...
Application of HEC-6 to ephemeral rivers of Arizona
DOT National Transportation Integrated Search
1986-01-01
The U.S. Army Corps of Engineers, computer program HEC-6--"Scour and Deposition in Rivers and Reservoirs" was applied to three ephemeral rivers of Arizona--Agua Fria River, Salt River, and Rillito Creek. The input data development techniques and resu...
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 8, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, View of Balustrade Wall from footbridge, looking upstream from lb STA. 173+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 7, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, view of left bank in construction, looking downstream from RB STA. 63+75 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 4, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of water line construction upstream at Walnut Street Bridgeupstream from point stadium - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Debris flows from tributaries of the Colorado River, Grand Canyon National Park, Arizona
Webb, Robert H.; Pringle, Patrick T.; Rink, Glenn R.
1989-01-01
A reconnaissance of 36 tributaries of the Colorado River indicates that debris flows are a major process by which sediment is transported to the Colorado River in Grand Canyon National Park. Debris flows are slurries of sediment and water that have a water content of less than about 40 percent by volume. Debris flows occur frequently in arid and semiarid regions. Slope failures commonly trigger debris flows, which can originate from any rock formation in the Grand Canyon. The largest and most frequent flows originate from the Permian Hermit Shale, the underlying Esplanade Sandstone of the Supai Group, and other formations of the Permian and Pennsylvanian Supai Group. Debris flows also occur in the Cambrian Muav Limestone and underlying Bright Angel Shale and the Quaternary basalts in the western Grand Canyon. Debris-flow frequency and magnitude were studied in detail in the Lava-Chuar Creek drainage at Colorado River mile 65.5; in the Monument Creek drainage at mile 93.5; and in the Crystal Creek drainage at mile 98.2. Debris flows have reached the Colorado River on an average of once every 20 to 30 years in the Lava-Chuar Creek drainage since about 1916. Two debris flows have reached the Colorado River in the last 25 years in Monument Creek. The Crystal Creek drainage has had an average of one debris flow reaching the Colorado River every 50 years, although the debris flow of 1966 has been the only flow that reached the Colorado River since 1900. Debris flows may actually reach the Colorado River more frequently in these drainages because evidence for all debris flows may not have been preserved in the channel-margin stratigraphy. Discharges were estimated for the peak flow of three debris flows that reached the Colorado River. The debris flow of 1966 in the Lava-Chuar Creek drainage had an estimated discharge of 4,000 cubic feet per second. The debris flow of 1984 in the Monument Creek drainage had a discharge estimated between 3,600 and 4,200 cubic feet per second. The debris flow of 1966 in the Crystal Creek drainage had a discharge estimated between 9,200 and 14,000 cubic feet per second. Determination of the effective cross-sectional area was a problem in all calculations involving superelevations on bends because areas near superelevation marks were 1.5 to 3.5 times larger than areas of upstream or downstream cross sections. Debris flows in the Grand Canyon generally are composed of 10 to 40 percent sand by weight and may represent a significant source of beach-building sand along the Colorado River. The particle-size distributions are very poorly sorted and the largest transported boulders were in the Crystal Creek drainage. The large boulders transported into the Colorado River by debris flows create or change hydraulic controls (rapids); these controls appear to be governed by the magnitude and frequency of tributary-flow events and the history of discharges on the Colorado River. Reworking of debris fans by the Colorado River creates debris bars that constrain the size of eddy systems and forms secondary rapids and riffles below tributary mouths.
Ice Crystal Icing Research at NASA
NASA Technical Reports Server (NTRS)
Flegel, Ashlie B.
2017-01-01
Ice crystals found at high altitude near convective clouds are known to cause jet engine power-loss events. These events occur due to ice crystals entering a propulsion system's core flowpath and accreting ice resulting in events such as uncommanded loss of thrust (rollback), engine stall, surge, and damage due to ice shedding. As part of a community with a growing need to understand the underlying physics of ice crystal icing, NASA has been performing experimental efforts aimed at providing datasets that can be used to generate models to predict the ice accretion inside current and future engine designs. Fundamental icing physics studies on particle impacts, accretion on a single airfoil, and ice accretions observed during a rollback event inside a full-scale engine in the Propulsion Systems Laboratory are summarized. Low fidelity code development using the results from the engine tests which identify key parameters for ice accretion risk and the development of high fidelity codes are described. These activities have been conducted internal to NASA and through collaboration efforts with industry, academia, and other government agencies. The details of the research activities and progress made to date in addressing ice crystal icing research challenges are discussed.
Ice Crystal Icing Research at NASA
NASA Technical Reports Server (NTRS)
Flegel, Ashlie B.
2017-01-01
Ice crystals found at high altitude near convective clouds are known to cause jet engine power-loss events. These events occur due to ice crystals entering a propulsion systems core flowpath and accreting ice resulting in events such as uncommanded loss of thrust (rollback), engine stall, surge, and damage due to ice shedding. As part of a community with a growing need to understand the underlying physics of ice crystal icing, NASA has been performing experimental efforts aimed at providing datasets that can be used to generate models to predict the ice accretion inside current and future engine designs. Fundamental icing physics studies on particle impacts, accretion on a single airfoil, and ice accretions observed during a rollback event inside a full-scale engine in the Propulsion Systems Laboratory are summarized. Low fidelity code development using the results from the engine tests which identify key parameters for ice accretion risk and the development of high fidelity codes are described. These activities have been conducted internal to NASA and through collaboration efforts with industry, academia, and other government agencies. The details of the research activities and progress made to date in addressing ice crystal icing research challenges are discussed.
Freshwater Choices in China: Options That Will Impact South and Southeast Asia
2014-12-04
engineering infrastructure upstream on shared international river basins within its borders, and will be able to effectively use the threat of...constructing hydro-engineering infrastructure upstream on shared international river basins within its borders, and will be able to effectively use the...international river basins within its borders, China will be able to effectively use the threat of restricting freshwater flows as a political weapon to
Integrated water resources management using engineering measures
NASA Astrophysics Data System (ADS)
Huang, Y.
2015-04-01
The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amoroso, J. W.; Marra, J. C.
2015-08-26
A multi-phase ceramic waste form is being developed at the Savannah River National Laboratory (SRNL) for treatment of secondary waste streams generated by reprocessing commercial spent nuclear. The envisioned waste stream contains a mixture of transition, alkali, alkaline earth, and lanthanide metals. Ceramic waste forms are tailored (engineered) to incorporate waste components as part of their crystal structure based on knowledge from naturally found minerals containing radioactive and non-radioactive species similar to the radionuclides of concern in wastes from fuel reprocessing. The ability to tailor ceramics to mimic naturally occurring crystals substantiates the long term stability of such crystals (ceramics)more » over geologic timescales of interest for nuclear waste immobilization [1]. A durable multi-phase ceramic waste form tailored to incorporate all the waste components has the potential to broaden the available disposal options and thus minimize the storage and disposal costs associated with aqueous reprocessing. This report summarizes results from three years of work on the IAEA Coordinated Research Project on “Processing technologies for high level waste, formulation of matrices and characterization of waste forms” (T21027), and specific task “Melt Processed Crystalline Ceramic Waste Forms for Advanced Nuclear Fuel Cycles” (17208).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amoroso, J. W.; Marra, J. C.
2015-08-26
A multi-phase ceramic waste form is being developed at the Savannah River National Laboratory (SRNL) for treatment of secondary waste streams generated by reprocessing commercial spent nuclear. The envisioned waste stream contains a mixture of transition, alkali, alkaline earth, and lanthanide metals. Ceramic waste forms are tailored (engineered) to incorporate waste components as part of their crystal structure based on knowledge from naturally found minerals containing radioactive and non-radioactive species similar to the radionuclides of concern in wastes from fuel reprocessing. The ability to tailor ceramics to mimic naturally occurring crystals substantiates the long term stability of such crystals (ceramics)more » over geologic timescales of interest for nuclear waste immobilization [1]. A durable multi-phase ceramic waste form tailored to incorporate all the waste components has the potential to broaden the available disposal options and thus minimize the storage and disposal costs associated with aqueous reprocessing. This report summarizes results from three years of work on the IAEA Coordinated Research Project on “Processing technologies for high level waste, formulation of matrices and characterization of waste forms” (T21027), and specific task “Melt Processed Crystalline Ceramic Waste Forms for Advanced Nuclear Fuel Cycles” (17208).« less
Additional challenges for uncertainty analysis in river engineering
NASA Astrophysics Data System (ADS)
Berends, Koen; Warmink, Jord; Hulscher, Suzanne
2016-04-01
The management of rivers for improving safety, shipping and environment requires conscious effort on the part of river managers. River engineers design hydraulic works to tackle various challenges, from increasing flow conveyance to ensuring minimal water depths for environmental flow and inland shipping. Last year saw the completion of such large scale river engineering in the 'Room for the River' programme for the Dutch Rhine River system, in which several dozen of human interventions were built to increase flood safety. Engineering works in rivers are not completed in isolation from society. Rather, their benefits - increased safety, landscaping beauty - and their disadvantages - expropriation, hindrance - directly affect inhabitants. Therefore river managers are required to carefully defend their plans. The effect of engineering works on river dynamics is being evaluated using hydraulic river models. Two-dimensional numerical models based on the shallow water equations provide the predictions necessary to make decisions on designs and future plans. However, like all environmental models, these predictions are subject to uncertainty. In recent years progress has been made in the identification of the main sources of uncertainty for hydraulic river models. Two of the most important sources are boundary conditions and hydraulic roughness (Warmink et al. 2013). The result of these sources of uncertainty is that the identification of single, deterministic prediction model is a non-trivial task. This is this is a well-understood problem in other fields as well - most notably hydrology - and known as equifinality. However, the particular case of human intervention modelling with hydraulic river models compounds the equifinality case. The model that provides the reference baseline situation is usually identified through calibration and afterwards modified for the engineering intervention. This results in two distinct models, the evaluation of which yields the effect of the proposed intervention. The implicit assumption underlying such analysis is that both models are commensurable. We hypothesize that they are commensurable only to a certain extent. In an idealised study we have demonstrated that prediction performance loss should be expected with increasingly large engineering works. When accounting for parametric uncertainty of floodplain roughness in model identification, we see uncertainty bounds for predicted effects of interventions increase with increasing intervention scale. Calibration of these types of models therefore seems to have a shelf-life, beyond which calibration does not longer improves prediction. Therefore a qualification scheme for model use is required that can be linked to model validity. In this study, we characterize model use along three dimensions: extrapolation (using the model with different external drivers), extension (using the model for different output or indicators) and modification (using modified models). Such use of models is expected to have implications for the applicability of surrogating modelling for efficient uncertainty analysis as well, which is recommended for future research. Warmink, J. J.; Straatsma, M. W.; Huthoff, F.; Booij, M. J. & Hulscher, S. J. M. H. 2013. Uncertainty of design water levels due to combined bed form and vegetation roughness in the Dutch river Waal. Journal of Flood Risk Management 6, 302-318 . DOI: 10.1111/jfr3.12014
33 CFR 80.757 - Suncoast Keys, FL to Horseshoe Point, FL.
Code of Federal Regulations, 2012 CFR
2012-07-01
... latitude 29°16.6′ N. longitude 83°06.7′ W. 300° true to the shoreline of Hog Island. (h) A north-south line... formed by the centerline of Highway 44 Bridge over the Salt River. (c) A north-south line drawn through Crystal River Entrance Daybeacon 25 across the river entrance. (d) A north-south line drawn through the...
33 CFR 80.757 - Suncoast Keys, FL to Horseshoe Point, FL.
Code of Federal Regulations, 2010 CFR
2010-07-01
... latitude 29°16.6′ N. longitude 83°06.7′ W. 300° true to the shoreline of Hog Island. (h) A north-south line... formed by the centerline of Highway 44 Bridge over the Salt River. (c) A north-south line drawn through Crystal River Entrance Daybeacon 25 across the river entrance. (d) A north-south line drawn through the...
33 CFR 80.757 - Suncoast Keys, FL to Horseshoe Point, FL.
Code of Federal Regulations, 2013 CFR
2013-07-01
... latitude 29°16.6′ N., longitude 83°06.7′ W., 300° true to the shoreline of Hog Island. (h) A north-south... formed by the centerline of Highway 44 Bridge over the Salt River. (c) A north-south line drawn through Crystal River Entrance Daybeacon 25 across the river entrance. (d) A north-south line drawn through the...
33 CFR 80.757 - Suncoast Keys, FL to Horseshoe Point, FL.
Code of Federal Regulations, 2011 CFR
2011-07-01
... latitude 29°16.6′ N. longitude 83°06.7′ W. 300° true to the shoreline of Hog Island. (h) A north-south line... formed by the centerline of Highway 44 Bridge over the Salt River. (c) A north-south line drawn through Crystal River Entrance Daybeacon 25 across the river entrance. (d) A north-south line drawn through the...
Debris flows from tributaries of the Colorado River, Grand Canyon National Park, Arizona
Webb, R.H.; Pringle, P.T.; Rink, G.R.
1987-01-01
A reconnaissance of 36 tributaries of the Colorado River indicates that debris flows are a major process by which sediment is transported to the Colorado River in Grand Canyon National Park. Debris flows are slurries of sediment and water that have a water content < 40% by volume. Debris flows occur frequently in arid and semiarid regions. Slope failures commonly trigger debris flows, which can originate from any rock formation in the Grand Canyon. The largest and most frequent flows originate from the Permian Hermit Shale, the underlying Esplanade Sandstone of the Supai Group, and other formations of the Permian and Pennsylvanian Supai Group. Debris flows have reached the Colorado River on an average of once every 20 to 30 yr in the Lava-Chuar Creek drainage since about 1916. Two debris flows have reached the Colorado River in the last 25 yr in Monument Creek. The Crystal Creek drainage has had an average of one debris flow reaching the Colorado River every 50 yr, although the debris flow of 1966 has been the only flow that reached the Colorado River since 1900. Debris flows may actually reach the Colorado River more frequently in these drainages because evidence for all debris flows may not have been preserved in the channel-margin stratigraphy. Discharges were estimated for the peak flow of three debris flows that reached the Colorado River. The debris flow of 1966 in the Lava-Chuar Creek drainage had an estimated discharge of 4,000 cu ft/sec. The debris flow of 1984 in the Monument Creek drainage had a discharge estimated between 3,600 and 4,200 cu ft/sec. The debris flow of 1966 in the Crystal Creek drainage had a discharge estimated between 9,200 and 14,000 cu ft/sec. Debris flows in the Grand Canyon generally are composed of 10 to 40% sand by weight and may represent a significant source of beach-building sand along the Colorado River. The particle size distributions are very poorly sorted and the largest transported boulders were in the Crystal Creek drainage. Reworking of debris fans by the Colorado River creates debris bars that constrain the size of eddy systems and forms secondary rapids and riffles below tributary mouths. (See also W89-09239) (Lantz-PTT)
NASA Astrophysics Data System (ADS)
Scheel, Hans J.; Fukuda, Tsuguo
2004-06-01
This volume deals with the technologies of crystal fabrication, of crystal machining, and of epilayer production and is the first book on industrial and scientific aspects of crystal and layer production. The major industrial crystals are treated: Si, GaAs, GaP, InP, CdTe, sapphire, oxide and halide scintillator crystals, crystals for optical, piezoelectric and microwave applications and more. Contains 29 contributions from leading crystal technologists covering the following topics:
AROMATIC AMINES IN AND NEAR THE BUFFALO RIVER
Three sediment samples taken from the Buffalo River and two soil samples taken near its bank have been analyzed for 2-propanol-extractable, basic organic compounds by using GC/MS. Eleven aromatic amines related to the commercial production of malachite green and crystal violet we...
Dupuy, Alton J.; Couvillion, Nolan P.
1979-01-01
From March 1977 to July 1978 the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers conducted a series of elutriate studies to determine water quality in selected reaches of major navigable waterways of southern Louisiana. Sample were collected from the Mississippi River-Gulf Outlet areas; Mississippi River, South Pass; Baptiste Collette Bayou; Tiger Pass area; Baou Long; Bayou Barataria and Barataria Bay Waterway area (gulf section); Bayou Segnette Waterway, Lake Pontchartrain near Tangipahoa River mouth; Bayou Grand Caillou; Bayou la Carpe at Homa; Houma Navigation Canal and Terrebonne Bay; Bayou Boeuf, Bayou Chene, and Baou Black, Atchafalaya River Channel, Atchafalaya Bay; Old River Lock tailbay; Red River below mouth of Black River; Freshwaer Canal; Mermentau River and Lake Arthur Mermentau River outlet; and Calcasieu Ship Channel. The studies were initiated at the request of the U.S. Army Corps of Engineers to evaluate possible environmental effects of proposed dredging activities in those waterways. The U.S. Army Corps of Engineers and U.S. Geological Survey collected 189 samples of native water and 172 samples of bottom (bed) material from 163 different sites. A total of 117 elutriates (Mixtures of native water and bottom material) were prepared. The native water and elutriate samples were analyzed for selected metals, pesticides, nutrients organics, and pysical constituents. Particle-size determinations were made on bottom-material samples. (Kosco-USGS)
DeLonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Annis, Mandy L.; Braaten, P. J.; Elliott, Caroline M.; Fuller, D. B.; Haas, Justin D.; Haddix, Tyler M.; Ladd, Hallie L.A.; McElroy, Brandon J.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wildhaber, Mark L.
2014-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2011 scope of work emphasized understanding of reproductive migrations and spawning of adult sturgeon, and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and including downstream reaches of the Milk River, and the Lower Yellowstone River. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2011.
NASA Astrophysics Data System (ADS)
Larsen, Annegret; Lane, Stuart; Larsen, Joshua
2017-04-01
Beavers (Castor fiber, Castor canadensis) have the ability to actively engineer their habitat, which they can do most effectively in lower order streams and their floodplains. Hence, this engineering has the potential to alter the hydrology, geomorphology, biogeochemistry, and ecology of river systems and the feedbacks between them. Thus, the beaver is often referred to as an 'ecosystem engineer' and is reflected in their recognition as a key species when restoring ecosystems. This capacity to engineer low order streams also shapes a range of positive and negative perceptions on their influence. On the one hand they may be perceived as capable of undermining existing river engineering schemes and the land use of associated floodplains, and on the other hand beavers may provide an alternative to traditional 'hard' engineering, potentially improving river restoration success. The aim of this review is to summarize research to date on the impacts of beavers on stream and floodplain hydrology, geomorphology, water-quality and ecology, and the feedbacks between them. Our review shows that: (1) research has been focused heavily on North American streams, with far less research outside this North American context; (2) there is a tendency to investigate beaver impacts from the perspective of individual disciplines, to the detriment of considering broader process feedbacks, notably at the interface of hydro-geomorphology and riparian ecology; (3) it remains unclear to which extent beavers genuinely engineered streams prior to human impact, pointing to the need for longer term (millennium scale) studies on how beavers have changed river-floodplain systems. Crucially, we conclude that the investigation of the effects of beavers on streams and floodplains, especially in a longer-term, and their use for river restoration can only be understood through the thorough investigation of antecedent hydro-geomorphic conditions which takes account of the ways in which beavers and humans have interacted together over many centuries.
Measuring river from the cloud - River width algorithm development on Google Earth Engine
NASA Astrophysics Data System (ADS)
Yang, X.; Pavelsky, T.; Allen, G. H.; Donchyts, G.
2017-12-01
Rivers are some of the most dynamic features of the terrestrial land surface. They help distribute freshwater, nutrients, sediment, and they are also responsible for some of the greatest natural hazards. Despite their importance, our understanding of river behavior is limited at the global scale, in part because we do not have a river observational dataset that spans both time and space. Remote sensing data represent a rich, largely untapped resource for observing river dynamics. In particular, publicly accessible archives of satellite optical imagery, which date back to the 1970s, can be used to study the planview morphodynamics of rivers at the global scale. Here we present an image processing algorithm developed using the Google Earth Engine cloud-based platform, that can automatically extracts river centerlines and widths from Landsat 5, 7, and 8 scenes at 30 m resolution. Our algorithm makes use of the latest monthly global surface water history dataset and an existing Global River Width from Landsat (GRWL) dataset to efficiently extract river masks from each Landsat scene. Then a combination of distance transform and skeletonization techniques are used to extract river centerlines. Finally, our algorithm calculates wetted river width at each centerline pixel perpendicular to its local centerline direction. We validated this algorithm using in situ data estimated from 16 USGS gauge stations (N=1781). We find that 92% of the width differences are within 60 m (i.e. the minimum length of 2 Landsat pixels). Leveraging Earth Engine's infrastructure of collocated data and processing power, our goal is to use this algorithm to reconstruct the morphodynamic history of rivers globally by processing over 100,000 Landsat 5 scenes, covering from 1984 to 2013.
A top-down approach to crystal engineering of a racemic Δ2-isoxazoline.
Lombardo, Giuseppe M; Rescifina, Antonio; Chiacchio, Ugo; Bacchi, Alessia; Punzo, Francesco
2014-02-01
The crystal structure of racemic dimethyl (4RS,5RS)-3-(4-nitrophenyl)-4,5-dihydroisoxazole-4,5-dicarboxylate, C13H12N2O7, has been determined by single-crystal X-ray diffraction. By analysing the degree of growth of the morphologically important crystal faces, a ranking of the most relevant non-covalent interactions determining the crystal structure can be inferred. The morphological information is considered with an approach opposite to the conventional one: instead of searching inside the structure for the potential key interactions and using them to calculate the crystal habit, the observed crystal morphology is used to define the preferential lines of growth of the crystal, and then this information is interpreted by means of density functional theory (DFT) calculations. Comparison with the X-ray structure confirms the validity of the strategy, thus suggesting this top-down approach to be a useful tool for crystal engineering.
An approach to crystallizing proteins by metal-mediated synthetic symmetrization
Laganowsky, Arthur; Zhao, Minglei; Soriaga, Angela B; Sawaya, Michael R; Cascio, Duilio; Yeates, Todd O
2011-01-01
Combining the concepts of synthetic symmetrization with the approach of engineering metal-binding sites, we have developed a new crystallization methodology termed metal-mediated synthetic symmetrization. In this method, pairs of histidine or cysteine mutations are introduced on the surface of target proteins, generating crystal lattice contacts or oligomeric assemblies upon coordination with metal. Metal-mediated synthetic symmetrization greatly expands the packing and oligomeric assembly possibilities of target proteins, thereby increasing the chances of growing diffraction-quality crystals. To demonstrate this method, we designed various T4 lysozyme (T4L) and maltose-binding protein (MBP) mutants and cocrystallized them with one of three metal ions: copper (Cu2+), nickel (Ni2+), or zinc (Zn2+). The approach resulted in 16 new crystal structures—eight for T4L and eight for MBP—displaying a variety of oligomeric assemblies and packing modes, representing in total 13 new and distinct crystal forms for these proteins. We discuss the potential utility of the method for crystallizing target proteins of unknown structure by engineering in pairs of histidine or cysteine residues. As an alternate strategy, we propose that the varied crystallization-prone forms of T4L or MBP engineered in this work could be used as crystallization chaperones, by fusing them genetically to target proteins of interest. PMID:21898649
1983-12-01
ENGINEERS WALTHAM MR NEWl INLSIID2GSRDDVDEC 83 F/G 13/2 U mEEmhhhohhhmhI MIRO OP RE OAV IS H R L -I- I~JDrought Contingency US Army Corps of Engineers Plan...LA.KE WA’ N, t:ehauc River, 3c,,thhr:Aee ino t irhrid. Massacnusetts -RAIN.A\\, ; AREA 4Q. quare miles ;ro-s’ 322 . saire miles ,net’ sT,’k.,; "’:Es 7lood
O'Shea, Thomas J.; Langtimm, Catherine A.; O'Shea, Thomas J.; Ackerman, B.B.; Percival, H. Franklin
1995-01-01
We applied Cormack-Jolly-Seber open population models to manatee (Trichechus manatus latirostris) photo-identification databases to estimate adult survival probabilities. The computer programs JOLLY and RECAPCO were used to estimate survival of 677 individuals in three study areas: Crystal River (winters 1977-78 to 1990-91), Blue Spring (winters 1977-78 to 1990-91), and the Atlantic Coast (winters 1984-85 to 1990-91). We also estimated annual survival from observations of 111 manatees tagged for studies with radiotelemetry. Survival estimated from observations with telemetry had broader confidence intervals than survival estimated with the Cormack-Jolly-Seber models. Annual probabilities of capture based on photo-identification records were generally high. The mean annual adult survival estimated from sighting-resighting records was 0.959-0.962 in the Crystal River and 0.936-0.948 at Blue Spring and may be high enough to permit population growth, given the values of other life-history parameters. On the Atlantic Coast, the estimated annual adult survival (range of means = 0.877-0.885) may signify a declining population. However, for several reasons, interpretation of data from the latter study group should be tempered with caution. Adult survivorship seems to be constant with age in all three study groups. No strong differences were apparent between adult survival ofmales and females in the Crystal River or at Blue Spring; the basis of significant differences between sexes on the Atlantic Coast is unclear. Future research into estimating survival with photo-identification and the Cormack-Jolly-Seber models should be vigorously pursued. Estimates of annual survival can provide an additional indication of Florida manatee population status with a stronger statistical basis than aerial counts and carcass totals.
76 FR 10524 - Restricted Area, Potomac River, Marine Corps Base Quantico, Quantico, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area, Potomac River, Marine Corps Base Quantico, Quantico, VA AGENCY: United States Army Corps of Engineers... Facility (MCAF) at Marine Corps Base Quantico (MCB Quantico), located in Quantico, Virginia. DATES...
Crystals of Serum Albumin for Use in Genetic Engineering and Rational Drug Design
NASA Technical Reports Server (NTRS)
Carter, Daniel C. (Inventor)
1996-01-01
Serum albumin crystal forms have been produced which exhibit superior x-ray diffraction quality. The crystals are produced from both recombinant and wild-type human serum albumin, canine, and baboon serum albumin and allow the performance of drug-binding studies as well as genetic engineering studies. The crystals are grown from solutions of polyethylene glycol or ammonium sulphate within prescribed limits during growth times from one to several weeks and include the following space groups: P2(sub 1), C2, P1.
NASA Astrophysics Data System (ADS)
Brown, R. A.; Pasternack, G. B.; Wallender, W. W.
2014-06-01
The synthesis of artificial landforms is complementary to geomorphic analysis because it affords a reflection on both the characteristics and intrinsic formative processes of real world conditions. Moreover, the applied terminus of geomorphic theory is commonly manifested in the engineering and rehabilitation of riverine landforms where the goal is to create specific processes associated with specific morphology. To date, the synthesis of river topography has been explored outside of geomorphology through artistic renderings, computer science applications, and river rehabilitation design; while within geomorphology it has been explored using morphodynamic modeling, such as one-dimensional simulation of river reach profiles, two-dimensional simulation of river networks, and three-dimensional simulation of subreach scale river morphology. To date, no approach allows geomorphologists, engineers, or river rehabilitation practitioners to create landforms of prescribed conditions. In this paper a method for creating topography of synthetic river valleys is introduced that utilizes a theoretical framework that draws from fluvial geomorphology, computer science, and geometric modeling. Such a method would be valuable to geomorphologists in understanding form-process linkages as well as to engineers and river rehabilitation practitioners in developing design surfaces that can be rapidly iterated. The method introduced herein relies on the discretization of river valley topography into geometric elements associated with overlapping and orthogonal two-dimensional planes such as the planform, profile, and cross section that are represented by mathematical functions, termed geometric element equations. Topographic surfaces can be parameterized independently or dependently using a geomorphic covariance structure between the spatial series of geometric element equations. To illustrate the approach and overall model flexibility examples are provided that are associated with mountain, lowland, and hybrid synthetic river valleys. To conclude, recommended advances such as multithread channels are discussed along with potential applications.
Effects of water-resource development on Yellowstone River streamflow, 1928-2002
Eddy-Miller, Cheryl A.; Chase, Katherine J.
2015-01-01
Major floods in 1996 and 1997 intensified public concern about the effects of human activities on the Yellowstone River in Montana. In 1999, the Yellowstone River Conservation District Council, whose members are primarily representatives from the conservation districts bordering the main stem of the Yellowstone River, was formed to promote wise use and conservation of the Yellowstone River’s natural resources. The Yellowstone River Conservation District Council is working with the U.S. Army Corps of Engineers to understand the cumulative hydrologic effects of water-resource development in the Yellowstone River Basin. The U.S. Army Corps of Engineers, Yellowstone River Conservation District Council, and U.S. Geological Survey began cooperatively studying the Yellowstone River in 2010, publishing four reports describing streamflow information for selected sites in the Yellowstone River Basin, 1928–2002. Detailed information about the methods used, as well as summary streamflow statistics, are available in the four reports. The purpose of this fact sheet is to highlight findings from the published reports and describe the effects of water use and structures, primarily dams, on the Yellowstone River streamflow.
Delonay, Aaron J.; Chojnacki, Kimberly A.; Jacobson, Robert B.; Braaten, Patrick J.; Buhl, Kevin J.; Elliott, Caroline M.; Erwin, Susannah O.; Faulkner, Jacob D.A.; Candrl, James S.; Fuller, David B.; Backes, Kenneth M.; Haddix, Tyler M.; Rugg, Matthew L.; Wesolek, Christopher J.; Eder, Brandon L.; Mestl, Gerald E.
2016-03-16
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery Program–Integrated Science Program. The project research consists of several interdependent and complementary tasks that involve multiple disciplines.The project research tasks in the 2014 scope of work emphasized understanding of reproductive migrations and spawning of adult pallid sturgeon and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and downstream reaches of the Milk River, and the Lower Yellowstone River. The project research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2014.
1981-12-01
Creek, Russian River Basin, Sonoma County , California; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer Waterways Experiment...Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali- fornia; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer...Structures Ables, J. H., Jr., and Pickering, G. A. 1973 (Feb). "Outlet Works, 0 Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali
2006-08-01
and on the west by the Banana River, which is an estuarine system. Figure 1-1 shows CCAFS and the surrounding area. CCAFS encompasses approximately...barrier island on which it is located characterizes the visual environment in the vicinity of CCAFS. The Indian and Banana rivers separate the...large expanses of inland waters in the Indian, Banana , and St. John’s rivers and large ENVIRONMENTAL ASSESSMENT-ENGINEERING SERVICES FACILITY AT
Climatic control of Mississippi River flood hazard amplified by river engineering.
Munoz, Samuel E; Giosan, Liviu; Therrell, Matthew D; Remo, Jonathan W F; Shen, Zhixiong; Sullivan, Richard M; Wiman, Charlotte; O'Donnell, Michelle; Donnelly, Jeffrey P
2018-04-04
Over the past century, many of the world's major rivers have been modified for the purposes of flood mitigation, power generation and commercial navigation. Engineering modifications to the Mississippi River system have altered the river's sediment levels and channel morphology, but the influence of these modifications on flood hazard is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability before the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood hazard on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño-Southern Oscillation and the Atlantic Multidecadal Oscillation, but that the artificial channelization (confinement to a straightened channel) has greatly amplified flood magnitudes over the past century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the past 500 years, reveal that the magnitude of the 100-year flood (a flood with a 1 per cent chance of being exceeded in any year) has increased by 20 per cent over those five centuries, with about 75 per cent of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood hazard to levels that are unprecedented within the past five centuries.
Slone, Daniel H.; Butler, Susan M.; Reid, James P.
2018-04-06
Kings Bay, Florida, is one of the most important natural winter habitat locations for the federally threatened Trichechus manatus latirostris (Florida manatee). Crystal River National Wildlife Refuge was established in 1983 specifically to provide protection for manatees and their critical habitat. To aid managers at the refuge and other agencies with this task, spatial analyses of local habitat use locations and travel corridors of manatees in Kings Bay during manatee season (November 15–March 31) are presented based on Global Positioning System telemetry of 41 manatees over a 12-year timespan (2006−18). Local habitat use areas and travel corridors differed spatially when Gulf of Mexico water temperatures were cold (less than or equal to 17 degrees Celsius) versus when they were warm (greater than 17 degrees Celsius). During times of cold water, manatees were found in higher concentrations in the main springs and canals throughout the eastern side of the bay, whereas when waters were warm, they were found more generally throughout the bay and into Crystal River, except for the central open part of the bay and the southwest corner.
Contreras, Daniel A.; Keefer, David K.
2009-01-01
Channeling of water through a variety of architectural features represents a significant engineering investment at the first millennium B.C. ceremonial center of Chavín de Huántar in the Peruvian Central Andes. The site contains extensive evidence of the manipulation of water, apparently for diverse purposes. The present configuration of the two local rivers, however, keeps available water approximately 9m below the highest level of water-bearing infrastructure in the site. Geomorphic and archaeological investigation of the fluvial history of the Wacheqsa River has revealed evidence that the Chavín-era configuration of the Wacheqsa River was different. A substantially higher water level, likely the result of a local impoundment of river water caused by a landslide dam, made the provision of water for the hydrologic system within the site a more readily practical possibility. We review what is known of that system and argue that the fluvial history of the Wacheqsa River is critical to understanding this aspect of hydrologic engineering and ritual practice at Chavín. This study demonstrates the relative rapidity and archaeological relevance of landscape change in a dynamic environment.
76 FR 79167 - Notice for the Great Lakes and Mississippi River Interbasin Study (GLMRIS)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... DEPARTMENT OF DEFENSE Department of the Army Corps of Engineers Notice for the Great Lakes and Mississippi River Interbasin Study (GLMRIS) AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD... Area Waterway System'' (ANS Control Paper). An Aquatic Nuisance Species (ANS) Control is an option or...
Responses of experimental river corridors to engineered log jams
USDA-ARS?s Scientific Manuscript database
Physical models of the Big Sioux River, SD, were constructed to assess the impact on flow, drag, and bed erosion and deposition in response to the installation of two different types of engineered log jams (ELJs). A fixed-bed model focused on flow velocity and forces acting on an instrumented ELJ, a...
23. Photocopy of original photo from Corps of Engineers, Los ...
23. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) CONSTRUCTION PHOTO SHOWING CURVED CONCRETE CHUTE SPILLWAY. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
21. Photocopy of original photo from Corps of Engineers, Los ...
21. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) SALINAS DAM UNDER CONSTRUCTION IN 1941. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
24. Photocopy of original photo from Corps of Engineers, Los ...
24. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown, report located at City of San Luis Obispo.) SALINAS DAM COMPLETION PHOTO. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
Application of single crystal superalloys for Earth-to-orbit propulsion systems
NASA Technical Reports Server (NTRS)
Dreshfield, R. L.; Parr, R. A.
1987-01-01
Single crystal superalloys were first identified as potentially useful engineering materials for aircraft gas turbine engines in the mid-1960's. Although they were not introduced into service as turbine blades in commercial aircraft engines until the early 1980's, they have subsequently accumulated tens of millions of flight hours in revenue producing service. The space shuttle main engine (SSME) and potential advanced earth-to-orbit propulsion systems impose severe conditions on turbopump turbine blades which for some potential failure modes are more severe than in aircraft gas turbines. Research activities which are directed at evaluating the potential for single crystal superalloys for application as turbopump turbine blades in the SSME and advanced rocket engines are discussed. The mechanical properties of these alloys are summarized and the effects of hydrogen are noted. The use of high gradient directional solidification and hot isostatic pressing to improve fatigue properties is also addressed.
NASA Astrophysics Data System (ADS)
Kim, Byoung Soo; Kim, Hyun Jin; An, Suyeong; Chi, Sangwon; Kim, Junseok; Lee, Jonghwi
2017-07-01
Recently, numerous attempts have been made to engineer micro- and nano-porous surface patterns or to develop convenient preparation methods for the practical applications of self-cleaning surfaces, water-repellent surfaces, novel textures, etc. Herein, we introduce a simple, cheap, and repeatable crystallization-based method to produce porous surface structures, on any surface of already fabricated polymeric materials. Contact of the solvent phase with cooled polymer surfaces enabled the limited dissolution of the surfaces and the subsequent extremely fast melt crystallization of the solvent. After removing the crystals, various micro- and nano-porous patterns were obtained, whose pore sizes ranged over three orders of magnitude. Pore depth was linearly dependent on the dissolution time. Crystal growth was mainly directed normal to the surfaces, but it was also controlled in-plane, resulting in cylindrical or lamellar structures. Superhydrophobic surfaces were successfully prepared on both polystyrene and polycarbonate. This process offers a novel surface engineering tool for a variety of polymer surfaces, whose topology can be conveniently controlled over a wide range by crystal engineering.
33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...
33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...
Modeling of Commercial Turbofan Engine With Ice Crystal Ingestion: Follow-On
NASA Technical Reports Server (NTRS)
Jorgenson, Philip C. E.; Veres, Joseph P.; Coennen, Ryan
2014-01-01
The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion, partially melting, and ice accretion on the compression system components. The result was degraded engine performance, and one or more of the following: loss of thrust control (roll back), compressor surge or stall, and flameout of the combustor. As ice crystals are ingested into the fan and low pressure compression system, the increase in air temperature causes a portion of the ice crystals to melt. It is hypothesized that this allows the ice-water mixture to cover the metal surfaces of the compressor stationary components which leads to ice accretion through evaporative cooling. Ice accretion causes a blockage which subsequently results in the deterioration in performance of the compressor and engine. The focus of this research is to apply an engine icing computational tool to simulate the flow through a turbofan engine and assess the risk of ice accretion. The tool is comprised of an engine system thermodynamic cycle code, a compressor flow analysis code, and an ice particle melt code that has the capability of determining the rate of sublimation, melting, and evaporation through the compressor flow path, without modeling the actual ice accretion. A commercial turbofan engine which has previously experienced icing events during operation in a high altitude ice crystal environment has been tested in the Propulsion Systems Laboratory (PSL) altitude test facility at NASA Glenn Research Center. The PSL has the capability to produce a continuous ice cloud which is ingested by the engine during operation over a range of altitude conditions. The PSL test results confirmed that there was ice accretion in the engine due to ice crystal ingestion, at the same simulated altitude operating conditions as experienced previously in flight. The computational tool was utilized to help guide a portion of the PSL testing, and was used to predict ice accretion could also occur at significantly lower altitudes. The predictions were qualitatively verified by subsequent testing of the engine in the PSL. In a previous study, analysis of select PSL test data points helped to calibrate the engine icing computational tool to assess the risk of ice accretion. This current study is a continuation of that data analysis effort. The study focused on tracking the variations in wet bulb temperature and ice particle melt ratio through the engine core flow path. The results from this study have identified trends, while also identifying gaps in understanding as to how the local wet bulb temperature and melt ratio affects the risk of ice accretion and subsequent engine behavior.
Modeling of Commercial Turbofan Engine with Ice Crystal Ingestion; Follow-On
NASA Technical Reports Server (NTRS)
Jorgenson, Philip C. E.; Veres, Joseph P.; Coennen, Ryan
2014-01-01
The occurrence of ice accretion within commercial high bypass aircraft turbine engines has been reported under certain atmospheric conditions. Engine anomalies have taken place at high altitudes that have been attributed to ice crystal ingestion, partially melting, and ice accretion on the compression system components. The result was degraded engine performance, and one or more of the following: loss of thrust control (roll back), compressor surge or stall, and flameout of the combustor. As ice crystals are ingested into the fan and low pressure compression system, the increase in air temperature causes a portion of the ice crystals to melt. It is hypothesized that this allows the ice-water mixture to cover the metal surfaces of the compressor stationary components which leads to ice accretion through evaporative cooling. Ice accretion causes a blockage which subsequently results in the deterioration in performance of the compressor and engine. The focus of this research is to apply an engine icing computational tool to simulate the flow through a turbofan engine and assess the risk of ice accretion. The tool is comprised of an engine system thermodynamic cycle code, a compressor flow analysis code, and an ice particle melt code that has the capability of determining the rate of sublimation, melting, and evaporation through the compressor flow path, without modeling the actual ice accretion. A commercial turbofan engine which has previously experienced icing events during operation in a high altitude ice crystal environment has been tested in the Propulsion Systems Laboratory (PSL) altitude test facility at NASA Glenn Research Center. The PSL has the capability to produce a continuous ice cloud which is ingested by the engine during operation over a range of altitude conditions. The PSL test results confirmed that there was ice accretion in the engine due to ice crystal ingestion, at the same simulated altitude operating conditions as experienced previously in flight. The computational tool was utilized to help guide a portion of the PSL testing, and was used to predict ice accretion could also occur at significantly lower altitudes. The predictions were qualitatively verified by subsequent testing of the engine in the PSL. In a previous study, analysis of select PSL test data points helped to calibrate the engine icing computational tool to assess the risk of ice accretion. This current study is a continuation of that data analysis effort. The study focused on tracking the variations in wet bulb temperature and ice particle melt ratio through the engine core flow path. The results from this study have identified trends, while also identifying gaps in understanding as to how the local wet bulb temperature and melt ratio affects the risk of ice accretion and subsequent engine behavior.
Zou, Yi; Chakravarty, Swapnajit; Zhu, Liang; Chen, Ray T.
2014-01-01
We experimentally demonstrate an efficient and robust method for series connection of photonic crystal microcavities that are coupled to photonic crystal waveguides in the slow light transmission regime. We demonstrate that group index taper engineering provides excellent optical impedance matching between the input and output strip waveguides and the photonic crystal waveguide, a nearly flat transmission over the entire guided mode spectrum and clear multi-resonance peaks corresponding to individual microcavities that are connected in series. Series connected photonic crystal microcavities are further multiplexed in parallel using cascaded multimode interference power splitters to generate a high density silicon nanophotonic microarray comprising 64 photonic crystal microcavity sensors, all of which are interrogated simultaneously at the same instant of time. PMID:25316921
1. BLACK RIVER CANAL PARSHALL FLUME AT UPPER END ...
1. BLACK RIVER CANAL - PARSHALL FLUME AT UPPER END OF SUPPLY (USED BY STATE ENGINEER). VIEW TO NORTHEAST - Carlsbad Irrigation District, Black River Canal, 15 miles Southeast of Carlsbad near Malaga, Carlsbad, Eddy County, NM
Delonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Braaten, Patrick J.; Buhl, Kevin J.; Eder, Brandon L; Elliott, Caroline M.; Erwin, Susannah O.; Fuller, David B.; Haddix, Tyler M.; Ladd, Hallie L.A.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wesolek, Christopher J.; Wildhaber, Mark L.
2016-01-20
The research tasks in the 2013 scope of work emphasized understanding reproductive migrations and spawning of adult pallid sturgeon, and hatch and drift of free embryos and larvae. These tasks were addressed in four study sections located in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Upper Missouri River downstream from Fort Peck Dam, including downstream reaches of the Milk River, the Lower Yellowstone River, and the Lower Missouri River downstream from Gavins Point Dam. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2013.
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE ...
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE RIVER BRIDGE, ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, PARHAM CONT. CO., CONTRACTOR' - Augusta Bridge, Spanning White River at Highway 64, Augusta, Woodruff County, AR
2012-05-16
Regional Command RCP Route Clearance Platoon RSOI Reception, Staging, Onward Movement, Integration SBCT Stryker Brigade Combat Team TOE Table of...Point (ASPs), and field hospital platforms; prepare river crossing sites; and support port repair due to Hydraulic Excavator (HYEX), provides force...platforms, FARPS, supply routes, roads, control points, fire bases, tank ditches, ASPs, and field hospital platforms; prepare river crossing sites; and
Climatic control of Mississippi River flood hazard amplified by river engineering
NASA Astrophysics Data System (ADS)
Munoz, Samuel E.; Giosan, Liviu; Therrell, Matthew D.; Remo, Jonathan W. F.; Shen, Zhixiong; Sullivan, Richard M.; Wiman, Charlotte; O’Donnell, Michelle; Donnelly, Jeffrey P.
2018-04-01
Over the past century, many of the world’s major rivers have been modified for the purposes of flood mitigation, power generation and commercial navigation. Engineering modifications to the Mississippi River system have altered the river’s sediment levels and channel morphology, but the influence of these modifications on flood hazard is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability before the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood hazard on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño–Southern Oscillation and the Atlantic Multidecadal Oscillation, but that the artificial channelization (confinement to a straightened channel) has greatly amplified flood magnitudes over the past century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the past 500 years, reveal that the magnitude of the 100-year flood (a flood with a 1 per cent chance of being exceeded in any year) has increased by 20 per cent over those five centuries, with about 75 per cent of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood hazard to levels that are unprecedented within the past five centuries.
Protein Crystal Based Nanomaterials
NASA Technical Reports Server (NTRS)
Bell, Jeffrey A.; VanRoey, Patrick
2001-01-01
This is the final report on a NASA Grant. It concerns a description of work done, which includes: (1) Protein crystals cross-linked to form fibers; (2) Engineering of protein to favor crystallization; (3) Better knowledge-based potentials for protein-protein contacts; (4) Simulation of protein crystallization.
1977-09-01
On 24 June 1974 Packer applied to the St. Paul District, Corps of Engineers (Corps) for a DOA permit under Section 10 of the River and Harbor Act of...exercised jurisdiction under Section 404 of P.L. 92-500 to the ordinary high water mark of the • Mississippi River, Thu’, even though the proposed project...Corps of Engineers was to expand their regulatory IT ril ct ion under Sect ion 404 of P.l.. 92-500 ,nd to promulgate new r- ’~giiI.,t .; ill conjunct
The purpose of the Mississippi River map series is to provide the U.S. Army Corps of Engineers with a comprehensive and contemporary view of the Mississippi River, and to provide a basis for identifying ecological vulnerability throughout the Mississippi River Basin. The current...
A hybrid phononic crystal for roof application.
Wan, Qingmian; Shao, Rong
2017-11-01
Phononic crystal is a type of acoustic material, and the study of phononic crystals has attracted great attention from national research institutions. Meanwhile, noise reduction in the low-frequency range has always encountered difficulties and troubles in the engineering field. In order to obtain a unique and effective low-frequency noise reduction method, in this paper a low frequency noise attenuation system based on phononic crystal structure is proposed and demonstrated. The finite element simulation of the band gap is consistent with the final test results. The effects of structure parameters on the band gaps were studied by changing the structure parameters and the band gaps can be controlled by suitably tuning structure parameters. The structure and results provide a good support for phononic crystal structures engineering application.
Corbett, J J; Robinson, A L
2001-04-01
This paper describes measurements of NOx emissions from one engine on a commercial towboat operating on the Upper Ohio River system around the Port of Pittsburgh. Continuous measurements were made over a one-week period to characterize emissions during normal operations. The average NOx emission factor is 70 +/- 4.2 kg of NOx per t of fuel, similar to that of larger marine engines. A vessel-specific duty cycle is derived to characterize the towboat's operations; more than 50% of the time the vessel engines are at idle. Although recently promulgated EPA regulations apply only to new marine engines, these data provide insight into inland-river operations, which can be used to evaluate these regulations within the inland river context. This vessel operates as a courier service, scheduling pickups and deliveries of single- or multiple-barge loads per customers' requests; as many as 30% of the 277 towboats in the Pittsburgh region operate in this fashion. The EPA-prescribed ISO E3 duty cycle does not accurately describe inland-river operations of this towboat: its application overestimates actual NOx emissions by 14%. Only 41% of this vessel's operations fall within the Not-To-Exceed Zone defined by the EPA regulations, which limits the effectiveness of this component of the regulations to limit emissions from vessels that operate in a similar fashion.
Pyroelectric Crystal Accelerator In The Department Of Physics And Nuclear Engineering At West Point
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gillich, Don; Kovanen, Andrew; Anderson, Tom
The Nuclear Science and Engineering Research Center (NSERC), a Defense Threat Reduction Agency (DTRA) office located at the United States Military Academy (USMA), sponsors and manages cadet and faculty research in support of DTRA objectives. The NSERC has created an experimental pyroelectric crystal accelerator program to enhance undergraduate education at USMA in the Department of Physics and Nuclear Engineering. This program provides cadets with hands-on experience in designing their own experiments using an inexpensive tabletop accelerator. This device uses pyroelectric crystals to ionize and accelerate gas ions to energies of {approx}100 keV. Within the next year, cadets and faculty atmore » USMA will use this device to create neutrons through the deuterium-deuterium (D-D) fusion process, effectively creating a compact, portable neutron generator. The double crystal pyroelectric accelerator will also be used by students to investigate neutron, x-ray, and ion spectroscopy.« less
Low-cost single-crystal turbine blades, volume 2
NASA Technical Reports Server (NTRS)
Strangman, T. E.; Dennis, R. E.; Heath, B. R.
1984-01-01
The overall objectives of Project 3 were to develop the exothermic casting process to produce uncooled single-crystal (SC) HP turbine blades in MAR-M 247 and higher strength derivative alloys and to validate the materials process and components through extensive mechanical property testing, rig testing, and 200 hours of endurance engine testing. These Program objectives were achieved. The exothermic casting process was successfully developed into a low-cost nonproperietary method for producing single-crystal castings. Single-crystal MAR-M 247 and two derivatives DS alloys developed during this project, NASAIR 100 and SC Alloy 3, were fully characterized through mechanical property testing. SC MAR-M 247 shows no significant improvement in strength over directionally solidified (DS) MAR-M 247, but the derivative alloys, NASAIR 100 and Alloy 3, show significant tensile and fatigue improvements. Firtree testing, holography, and strain-gauge rig testing were used to determine the effects of the anisotropic characteristics of single-crystal materials. No undesirable characteristics were found. In general, the single-crystal material behaved similarly to DS MAR-M 247. Two complete engine sets of SC HP turbine blades were cast using the exothermic casting process and fully machined. These blades were successfully engine-tested.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... of Intent To Prepare an Environmental Impact Statement for the Missouri River Recovery Management Plan, Missouri River, United States AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD... amended, the U.S. Army Corps of Engineers (USACE), Kansas City and Omaha Districts, intend to prepare the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Proposed rule. SUMMARY: The U.S. Army requested that the U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Direct final rule. SUMMARY: The U.S. Army requested that the U.S...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR
22. Photocopy of original photo from Corps of Engineers, Los ...
22. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) CONSTRUCTION PHOTO SHOWING THE STRUTS, POURED TO ALIGN WITH THE RIGHT (WEST) BUTTRESS. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
An overview of inverted colloidal crystal systems for tissue engineering.
João, Carlos Filipe C; Vasconcelos, Joana Marta; Silva, Jorge Carvalho; Borges, João Paulo
2014-10-01
Scaffolding is at the heart of tissue engineering but the number of techniques available for turning biomaterials into scaffolds displaying the features required for a tissue engineering application is somewhat limited. Inverted colloidal crystals (ICCs) are inverse replicas of an ordered array of monodisperse colloidal particles, which organize themselves in packed long-range crystals. The literature on ICC systems has grown enormously in the past 20 years, driven by the need to find organized macroporous structures. Although replicating the structure of packed colloidal crystals (CCs) into solid structures has produced a wide range of advanced materials (e.g., photonic crystals, catalysts, and membranes) only in recent years have ICCs been evaluated as devices for medical/pharmaceutical and tissue engineering applications. The geometry, size, pore density, and interconnectivity are features of the scaffold that strongly affect the cell environment with consequences on cell adhesion, proliferation, and differentiation. ICC scaffolds are highly geometrically ordered structures with increased porosity and connectivity, which enhances oxygen and nutrient diffusion, providing optimum cellular development. In comparison to other types of scaffolds, ICCs have three major unique features: the isotropic three-dimensional environment, comprising highly uniform and size-controllable pores, and the presence of windows connecting adjacent pores. Thus far, this is the only technique that guarantees these features with a long-range order, between a few nanometers and thousands of micrometers. In this review, we present the current development status of ICC scaffolds for tissue engineering applications.
Road Map for Development of Crystal-Tolerant High Level Waste Glasses
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matyas, Josef; Vienna, John D.; Peeler, David
This road map guides the research and development for formulation and processing of crystal-tolerant glasses, identifying near- and long-term activities that need to be completed over the period from 2014 to 2019. The primary objective is to maximize waste loading for Hanford waste glasses without jeopardizing melter operation by crystal accumulation in the melter or melter discharge riser. The potential applicability to the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) is also addressed in this road map.
Integration of manatee life-history data and population modeling
Eberhardt, L.L.; O'Shea, Thomas J.; O'Shea, Thomas J.; Ackerman, B.B.; Percival, H. Franklin
1995-01-01
Aerial counts and the number of deaths have been a major focus of attention in attempts to understand the population status of the Florida manatee (Trichechus manatus latirostris). Uncertainties associated with these data have made interpretation difficult. However, knowledge of manatee life-history attributes increased and now permits the development of a population model. We describe a provisional model based on the classical approach of Lotka. Parameters in the model are based on data from'other papers in this volume and draw primarily on observations from the Crystal River, Blue Spring, and Adantic Coast areas. The model estimates X (the finite rate ofincrease) at each study area, and application ofthe delta method provides estimates of variance components and partial derivatives ofX with respectto key input parameters (reproduction, adult survival, and early survival). In some study areas, only approximations of some parameters are available. Estimates of X and coefficients of variation (in parentheses) of manatees were 1.07 (0.009) in the Crystal River, 1.06 (0.012) at Blue Spring, and 1.01 (0.012) on the Atlantic Coast. Changing adult survival has a major effect on X. Early-age survival has the smallest effect. Bootstrap comparisons of population growth estimates from trend counts in the Crystal River and at Blue Spring and the reproduction and survival data suggest that the higher, observed rates from counts are probably not due to chance. Bootstrapping for variance estimates based on reproduction and survival data from manatees at Blue Spring and in the Crystal River provided estimates of X, adult survival, and rates of reproduction that were similar to those obtained by other methods. Our estimates are preliminary and suggestimprovements for future data collection and analysis. However, results support efforts to reduce mortality as the most effective means to promote the increased growth necessary for the eventual recovery of the Florida manatee population.
NASA Astrophysics Data System (ADS)
Murphy, John T.; Lowenstein, Tim K.; Pietras, Jeffrey T.
2014-12-01
Significant changes in carbonate mineralogy, texture, and stable isotope composition occur at the transition from the Wilkins Peak Member to the Laney Member in the Eocene Green River Formation, Bridger Basin, Wyoming, which reflect evolution of inflow waters, lake waters, and paleoenvironments. The top of the Wilkins Peak Member contains heterogeneous laminae of calcite and dolomite. Evaporites associated with these layers suggest deposition in hypersaline lakes. Diagenetic carbonate mineral textures include euhedral cement overgrowths and interlocking mosaics of calcite and dolomite crystals, 20-70 μm in size. Electron microprobe analyses indicate diagenetic overgrowth of Fe-rich dolomite on cloudy Fe-poor cores. δ18O values of carbonate laminae in the upper Wilkins Peak Member vary by ~ 6‰ with no depth dependent or mineralogic trends, which also suggests diagenetic overprinting. Alternating organic-rich and primary aragonite, calcite, and dolomite laminae were identified from the lower Laney Member. Primary lacustrine aragonite consists of well sorted, prismatic crystals 5-10 μm in length, with micro-lamination defined by crystal size variation. Primary precipitated calcite and dolomite laminae are monominerallic, with well sorted polyhedral crystals, ~ 10 μm in size. Primary mineralogy of the lower Laney Member changes from calcite to aragonite and dolomite stratigraphically upward. Along the same 15 m thick stratigraphic interval, δ18O values decrease upward by ~ 3‰, all of which suggests (1) lake waters underwent evaporative concentration, which together with calcite precipitation increased the lake water Mg/Ca ratios and led to formation of aragonite and dolomite, (2) source waters became lower in δ18O, possibly as inflow changed to higher altitude foreland rivers. The results from this study show that understanding the primary lacustrine versus diagenetic origin of Green River carbonate minerals is essential for paleoenvironmental and paleoclimate interpretations.
75 FR 81464 - Safety Zone; Columbia River, The Dalles Lock and Dam
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
...-AA00 Safety Zone; Columbia River, The Dalles Lock and Dam AGENCY: Coast Guard, DHS. ACTION: Temporary... Columbia River in the vicinity of The Dalles Lock and Dam while the Army Corps of Engineers completes...; Columbia River, The Dalles Lock and Dam (a) Location. The following is a safety zone: All waters of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing plan of bars in top flange, elevation of girder reinforcement, plan of bars in bottom flange - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing general plan, plan of top chord, elevation of main girder, transverse section, plan section at deck level. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing elevation of center pier, elevation and plan of north and south abutments, sections of abutments, pier, and pier footings - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
Designing and Implementation of River Classification Assistant Management System
NASA Astrophysics Data System (ADS)
Zhao, Yinjun; Jiang, Wenyuan; Yang, Rujun; Yang, Nan; Liu, Haiyan
2018-03-01
In an earlier publication, we proposed a new Decision Classifier (DCF) for Chinese river classification based on their structures. To expand, enhance and promote the application of the DCF, we build a computer system to support river classification named River Classification Assistant Management System. Based on ArcEngine and ArcServer platform, this system implements many functions such as data management, extraction of river network, river classification, and results publication under combining Client / Server with Browser / Server framework.
NASA Technical Reports Server (NTRS)
Abdul-Aziz, Ali; Kalluri, Sreeramesh
1991-01-01
The temperature-dependent engineering elastic constants of a directionally solidified nickel-base superalloy were estimated from the single-crystal elastic constants of nickel and MAR-MOO2 superalloy by using Wells' method. In this method, the directionally solidified (columnar-grained) nickel-base superalloy was modeled as a transversely isotropic material, and the five independent elastic constants of the transversely isotropic material were determined from the three independent elastic constants of a cubic single crystal. Solidification for both the single crystals and the directionally solidified superalloy was assumed to be along the (001) direction. Temperature-dependent Young's moduli in longitudinal and transverse directions, shear moduli, and Poisson's ratios were tabulated for the directionally solidified nickel-base superalloy. These engineering elastic constants could be used as input for performing finite element structural analysis of directionally solidified turbine engine components.
Update on the NASA Glenn Propulsion Systems Lab Ice Crystal Cloud Characterization (2015)
NASA Technical Reports Server (NTRS)
Van Zante, Judith F.; Bencic, Timothy J.; Ratvasky, Thomas P.
2016-01-01
NASA Glenn's Propulsion Systems Lab (PSL), an altitude engine test facility, was outfitted with a spray system to generate ice crystals. The first ice crystal characterization test occurred in 2012. At PSL, turbine engines and driven rigs can experience ice crystal icing at flight altitudes, temperatures and Mach numbers. To support these tests, four ice crystal characterizations have been conducted in two different facility configurations. In addition, super-cooled liquid and mixed phase clouds have also been generated. This paper will discuss the recent learning from the previous two calibrations. It will describe some of the 12-parameter calibration space, and how those parameters interact with each other, the instrumentation used to characterize the cloud and present a sample of the cloud characterization results.
Single crystal diamond membranes for nanoelectronics.
Bray, Kerem; Kato, Hiromitsu; Previdi, Rodolfo; Sandstrom, Russell; Ganesan, Kumaravelu; Ogura, Masahiko; Makino, Toshiharu; Yamasaki, Satoshi; Magyar, Andrew P; Toth, Milos; Aharonovich, Igor
2018-02-22
Single crystal, nanoscale diamond membranes are highly sought after for a variety of applications including nanophotonics, nanoelectronics and quantum information science. However, so far, the availability of conductive diamond membranes has remained an unreachable goal. In this work we present a complete nanofabrication methodology for engineering high aspect ratio, electrically active single crystal diamond membranes. The membranes have large lateral directions, exceeding ∼500 × 500 μm 2 and are only several hundreds of nanometers thick. We further realize vertical single crystal p-n junctions made from the diamond membranes that exhibit onset voltages of ∼10 V and a current of several mA. Moreover, we deterministically introduce optically active color centers into the membranes, and demonstrate for the first time a single crystal nanoscale diamond LED. The robust and scalable approach to engineer the electrically active single crystal diamond membranes offers new pathways for advanced nanophotonic, nanoelectronic and optomechanical devices employing diamond.
12. Detail of clutch and backup gasoline engine for powering ...
12. Detail of clutch and backup gasoline engine for powering Stoney gates. Clutch mechanism manufactured by Baldridge Machine Company, Detroit, Michigan, ca. 1910. Instrument to the left records volume of flow through headworks. View looking south towards Stoney gates. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
2014-08-01
Hydrokinetic Turbine Development Affecting the US Army Corps of Engineers by David L. Smith, John M. Nestler, Richard Styles, and Brian Tetreault BACKGROUND...attendant environmental impacts. One family of renewable energy technologies experiencing increased national interest is hydrokinetic turbines ...Hydrokinetic turbines include systems that convert waves, tides, and river flow (without impoundment) into electric energy. River hydrokinetic turbines
NASA Astrophysics Data System (ADS)
Viparelli, Enrica; Gaeuman, David; Wilcock, Peter; Parker, Gary
2011-02-01
Major changes in the morphology of the Trinity River in California, such as narrowing of the cross section and sedimentation of fine sediment in pools, occurred after the closure of a system of dams. These changes caused a dramatic reduction in the salmonid population and a resulting decline of the fishery. Gravel augmentation, regulated flood releases, and mechanical channel rehabilitation are currently being implemented to help restore the aquatic habitat of the river. The present paper describes a tool, named the Spawning Gravel Refresher, for designing and predicting the effects of gravel augmentation in gravel bed rivers. The tool assumes an imposed, cycled hydrograph. The model is calibrated and applied to the regulated reach of the Trinity River in four steps: (1) zeroing runs to reproduce conditions of mobile bed equilibrium as best can be estimated for the predam Trinity River, (2) runs to compare the predictions with the results of previous studies, (3) runs at an engineering time scale to reproduce the effects of the dams, and (4) runs to design gravel augmentation schemes. In the fourth group of runs, the combined effects of engineered flood flow releases and gravel augmentation are predicted. At an engineering time scale, the model indicates that the fraction of fine sediment in the surface layer and in the topmost part of the substrate should decrease when subjected to these two restoration measures, with a consequent improvement of the quality of the spawning gravel.
Sun, Enwei; Cao, Wenwu
2014-01-01
In the past decade, domain engineered relaxor-PT ferroelectric single crystals, including (1-x)Pb(Mg1/3Nb2/3)O3-xPbTiO3 (PMN-PT), (1-x)Pb(Zn1/3Nb2/3)O3-xPbTiO3 (PZN-PT) and (1-x-y)Pb(In1/2Nb1/2)O3-yPb(Mg1/3Nb2/3)O3-xPbTiO3 (PIN-PMN-PT), with compositions near the morphotropic phase boundary (MPB) have triggered a revolution in electromechanical devices owing to their giant piezoelectric properties and ultra-high electromechanical coupling factors. Compared to traditional PbZr1-xTixO3 (PZT) ceramics, the piezoelectric coefficient d33 is increased by a factor of 5 and the electromechanical coupling factor k33 is increased from < 70% to > 90%. Many emerging rich physical phenomena, such as charged domain walls, multi-phase coexistence, domain pattern symmetries, etc., have posed challenging fundamental questions for scientists. The superior electromechanical properties of these domain engineered single crystals have prompted the design of a new generation electromechanical devices, including sensors, transducers, actuators and other electromechanical devices, with greatly improved performance. It took less than 7 years from the discovery of larger size PMN-PT single crystals to the commercial production of the high-end ultrasonic imaging probe “PureWave”. The speed of development is unprecedented, and the research collaboration between academia and industrial engineers on this topic is truly intriguing. It is also exciting to see that these relaxor-PT single crystals are being used to replace traditional PZT piezoceramics in many new fields outside of medical imaging. The new ternary PIN-PMN-PT single crystals, particularly the ones with Mn-doping, have laid a solid foundation for innovations in high power acoustic projectors and ultrasonic motors, hinting another revolution in underwater SONARs and miniature actuation devices. This article intends to provide a comprehensive review on the development of relaxor-PT single crystals, spanning material discovery, crystal growth techniques, domain engineering concept, and full-matrix property characterization all the way to device innovations. It outlines a truly encouraging story in materials science in the modern era. All key references are provided and 30 complete sets of material parameters for different types of relaxor-PT single crystals are listed in the Appendix. It is the intension of this review article to serve as a resource for those who are interested in basic research and practical applications of these relaxor-PT single crystals. In addition, possible mechanisms of giant piezoelectric properties in these domain-engineered relaxor-PT systems will be discussed based on contributions from polarization rotation and charged domain walls. PMID:25061239
Sun, Enwei; Cao, Wenwu
2014-08-01
In the past decade, domain engineered relaxor-PT ferroelectric single crystals, including (1- x )Pb(Mg 1/3 Nb 2/3 )O 3 - x PbTiO 3 (PMN-PT), (1- x )Pb(Zn 1/3 Nb 2/3 )O 3 - x PbTiO 3 (PZN-PT) and (1- x - y )Pb(In 1/2 Nb 1/2 )O 3 - y Pb(Mg 1/3 Nb 2/3 )O 3 - x PbTiO 3 (PIN-PMN-PT), with compositions near the morphotropic phase boundary (MPB) have triggered a revolution in electromechanical devices owing to their giant piezoelectric properties and ultra-high electromechanical coupling factors. Compared to traditional PbZr 1- x Ti x O 3 (PZT) ceramics, the piezoelectric coefficient d 33 is increased by a factor of 5 and the electromechanical coupling factor k 33 is increased from < 70% to > 90%. Many emerging rich physical phenomena, such as charged domain walls, multi-phase coexistence, domain pattern symmetries, etc., have posed challenging fundamental questions for scientists. The superior electromechanical properties of these domain engineered single crystals have prompted the design of a new generation electromechanical devices, including sensors, transducers, actuators and other electromechanical devices, with greatly improved performance. It took less than 7 years from the discovery of larger size PMN-PT single crystals to the commercial production of the high-end ultrasonic imaging probe "PureWave". The speed of development is unprecedented, and the research collaboration between academia and industrial engineers on this topic is truly intriguing. It is also exciting to see that these relaxor-PT single crystals are being used to replace traditional PZT piezoceramics in many new fields outside of medical imaging. The new ternary PIN-PMN-PT single crystals, particularly the ones with Mn-doping, have laid a solid foundation for innovations in high power acoustic projectors and ultrasonic motors, hinting another revolution in underwater SONARs and miniature actuation devices. This article intends to provide a comprehensive review on the development of relaxor-PT single crystals, spanning material discovery, crystal growth techniques, domain engineering concept, and full-matrix property characterization all the way to device innovations. It outlines a truly encouraging story in materials science in the modern era. All key references are provided and 30 complete sets of material parameters for different types of relaxor-PT single crystals are listed in the Appendix. It is the intension of this review article to serve as a resource for those who are interested in basic research and practical applications of these relaxor-PT single crystals. In addition, possible mechanisms of giant piezoelectric properties in these domain-engineered relaxor-PT systems will be discussed based on contributions from polarization rotation and charged domain walls.
Wash load and bed-material load transport in the Yellow River
Yang, C.T.; Simoes, F.J.M.
2005-01-01
It has been the conventional assumption that wash load is supply limited and is only indirectly related to the hydraulics of a river. Hydraulic engineers also assumed that bed-material load concentration is independent of wash load concentration. This paper provides a detailed analysis of the Yellow River sediment transport data to determine whether the above assumptions are true and whether wash load concentration can be computed from the original unit stream power formula and the modified unit stream power formula for sediment-laden flows. A systematic and thorough analysis of 1,160 sets of data collected from 9 gauging stations along the Middle and Lower Yellow River confirmed that the method suggested by the conjunctive use of the two formulas can be used to compute wash load, bed-material load, and total load in the Yellow River with accuracy. Journal of Hydraulic Engineering ?? ASCE.
Update on the NASA Glenn Propulsion Systems Lab Ice Crystal Cloud Characterization (2015, 2016)
NASA Technical Reports Server (NTRS)
Van Zante, Judith; Bencic, Timothy; Ratvasky, Thomas
2016-01-01
NASA Glenn's Propulsion Systems Lab, an altitude engine test facility, was outfitted with a spray system to generate ice crystals in 2011. Turbine engines and driven rigs can experience ice crystal icing at flight altitudes, temperatures and Mach numbers. To support these tests, four ice crystal characterizations have been conducted in two different facility configurations. In addition, super-cooled liquid and mixed phase clouds have also been generated. This paper represents a work in progress. It will describe some of the 11-parameter calibration space, and how those parameters interact with each other, the instrumentation used to characterize the cloud and present a sample of the cloud characterization results.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
..., LLC (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing U. S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. The proposed...
A River Discharge Model for Coastal Taiwan during Typhoon Morakot
2012-08-01
Multidisciplinary Simulation, Estimation, and Assimilation Systems Reports in Ocean Science and Engineering MSEAS-13 A River Discharge...in this region. The island’s major rivers have correspondingly large drainage basins, and outflow from these river mouths can substantially reduce the...Multidisciplinary Simulation, Estimation, and Assimilation System (MSEAS) has been used to simulate the ocean dynamics and forecast the uncertainty
Fretting Stresses in Single Crystal Superalloy Turbine Blade Attachments
NASA Technical Reports Server (NTRS)
Arakere, Nagaraj K.; Swanson, Gregory
2000-01-01
Single crystal nickel base superalloy turbine blades are being utilized in rocket engine turbopumps and turbine engines because of their superior creep, stress rupture, melt resistance and thermomechanical fatigue capabilities over polycrystalline alloys. Currently the most widely used single crystal nickel base turbine blade superalloys are PWA 1480/1493 and PWA 1484. These alloys play an important role in commercial, military and space propulsion systems. High Cycle Fatigue (HCF) induced failures in aircraft gas turbine and rocket engine turbopump blades is a pervasive problem. Blade attachment regions are prone to fretting fatigue failures. Single crystal nickel base superalloy turbine blades are especially prone to fretting damage because the subsurface shear stresses induced by fretting action at the attachment regions can result in crystallographic initiation and crack growth along octahedral planes. Furthermore, crystallographic crack growth on octahedral planes under fretting induced mixed mode loading can be an order of magnitude faster than under pure mode I loading. This paper presents contact stress evaluation in the attachment region for single crystal turbine blades used in the NASA alternate Advanced High Pressure Fuel Turbo Pump (HPFTP/AT) for the Space Shuttle Main Engine (SSME). Single crystal materials have highly orthotropic properties making the position of the crystal lattice relative to the part geometry a significant factor in the overall analysis. Blades and the attachment region are modeled using a large-scale 3D finite element (FE) model capable of accounting for contact friction, material orthotrophy, and variation in primary and secondary crystal orientation. Contact stress analysis in the blade attachment regions is presented as a function of coefficient of friction and primary and secondary crystal orientation, Stress results are used to discuss fretting fatigue failure analysis of SSME blades. Attachment stresses are seen to reach peak values at locations where fretting cracks have been observed. Fretting stresses at the attachment region are seen to vary significantly as a function of crystal orientation. Attempts to adapt techniques used for estimating fatigue life in the airfoil region, for life calculations in the attachment region, are presented. An effective model for predicting crystallographic crack initiation under mixed mode loading is required for life prediction under fretting action.
19. REGIONAL MAP, SALINAS RIVER PROJECT, CAMP SAN LUIS OBISPO, ...
19. REGIONAL MAP, SALINAS RIVER PROJECT, CAMP SAN LUIS OBISPO, IN CENTRAL PORTION OF SAN LUIS OBISPO, CALIFORNIA. Leeds Hill Barnard & Jewett - Consulting Engineers, February 1942. - Salinas River Project, Cuesta Tunnel, Southeast of U.S. 101, San Luis Obispo, San Luis Obispo County, CA
Directional Gila River crossing saves construction, mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saylor, L.A.
1994-12-01
Directional drilled river crossing technology gained a new convert this fall as El Paso Natural Gas Co. (EPNG) replaced a washed out 10 3/4-in. line that crossed the Gila River and two irrigation canals near Yuma, Ariz. The 1,650-ft bore, the company's first drilled river crossing, saved both construction costs and environmental reporting and mitigation expenses. This paper reviews the planning, engineering, and equipment used to install this river pipeline crossing.
Preface: Bridging the gap between theory and practice on the upper Mississippi River
Lubinski, Kenneth S.
1995-01-01
In July 1994, the Upper Mississippi River (UMR) served as a nexus for coalescing scientific information and management issues related to worldwide floodplain river ecosystems. The objective of the conference ‘Sustaining the Ecological Integrity of Large Floodplain Rivers: Application of Ecological Knowledge to River Management’, was to provide presentations of current ideas from the scientific community. To translate the many lessons learned on other river systems to operational decisions on the UMR, a companion workshop for managers and the general public was held immediately after the conference.An immediate local need for such sharing has existed for several years, as the U.S. Corps of Engineers is currently planning commercial navigation activities that will influence the ecological integrity of the river over the next half century. Recently, other equally important management issues have surfaced, including managing the river as an element of the watershed, and assessing its ecological value as a system instead of a collection of parts (Upper Mississippi River Conservation Committee, 1993). Regional and state natural resource agencies are becoming more convinced that they need to address these issues within their own authorities, however spatially limited, rather than relying on the U.S. Corps of Engineers to manage the ecosystem as an adjunct to its purpose of navigation support.
Engineering Provision of Assault Crossing of Rivers,
1983-01-21
in the first place, in the missile and nuclear weapons warfare sharply they increased frontage and the depth of troop dispositions in the defense...modern missile and nuclear weapons warfare the medium * and wide rivers, reinforced by mine fields and decomposition of water-engineering and other...PMP and transport motor pool PVD -20. The existing pontoon trains make it possible to mechanize labor-consuming fitters work, to the minimum to bring
Carbon storage in the Mississippi River delta enhanced by environmental engineering
NASA Astrophysics Data System (ADS)
Shields, Michael R.; Bianchi, Thomas S.; Mohrig, David; Hutchings, Jack A.; Kenney, William F.; Kolker, Alexander S.; Curtis, Jason H.
2017-11-01
River deltas have contributed to atmospheric carbon regulation throughout Earth history, but functioning in the modern era has been impaired by reduced sediment loads, altered hydrologic regimes, increased global sea-level rise and accelerated subsidence. Delta restoration involves environmental engineering via river diversions, which utilize self-organizing processes to create prograding deltas. Here we analyse sediment cores from Wax Lake delta, a product of environmental engineering, to quantify the burial of organic carbon. We find that, despite relatively low concentrations of organic carbon measured in the cores (about 0.4%), the accumulation of about 3 T m-2 of sediment over the approximate 60 years of delta building resulted in the burial of a significant amount of organic carbon (16 kg m-2). This equates to an apparent organic carbon accumulation rate of 250 +/- 23 g m-2 yr-1, which implicitly includes losses by carbon emissions and erosion. Our estimated accumulation rate for Wax Lake delta is substantially greater than previous estimates based on the top metre of delta sediments and comparable to those of coastal mangrove and marsh habitats. The sedimentation of carbon at the Wax Lake delta demonstrates the capacity of engineered river diversions to enhance both coastal accretion and carbon burial.
The Huntington District of the U.S. Army Corps of Engineers, in collaboration with the Ohio River Basin Alliance, the Institute for Water Resources, the Great Lakes and Ohio River Division, and numerous other Federal agencies, non-governmental organizations, research institutions...
Designing forward with an eye to the past: Morphogenesis of the lower Yuba River
NASA Astrophysics Data System (ADS)
James, L. Allan
2015-12-01
The early geomorphic evolution of the lower Yuba River (LYR), northern California, up to 1906 is reconstructed using cartographic, documentary, topographic, and stratigraphic evidence. The importance of early river mining is identified along with rates and patterns of floodplain aggradation and channel incision at the turn of the 20th century. The LYR is a classic example of anthropogeomorphic transformation of a river by episodic hydraulic mining sedimentation. This was followed by channelization, damming, dredging, and other engineering works to redirect, contain, and stabilize channels. These geomorphic changes and engineering controls continue to govern channel and floodplain form and process, control the trajectory of river responses, and constrain flood control, water quality, and aquatic ecosystem management options. Returning a river system to a prior condition should not be the primary goal of river rehabilitation projects, especially if hydrologic inputs have substantially changed. Reconstructing former conditions may be impractical and unsustainable under modern circumstances. Instead, fluvial systems should be designed and managed for present inputs and processes while anticipating future conditions. Rapid changes in land use and climate that generate changes in runoff and sediment loadings are likely to generate morphological instability, and these changes should be considered in the design and management of fluvial systems. The past geomorphic evolution of fluvial systems should also be considered in design and management decisions to recognize trajectories and suppressed tendencies. Recognition of trends and system vulnerabilities may avoid potential blunders, such as removing critical stabilizing works. Complex causalities may be difficult to reconstruct from geomorphic form alone, however, due to process-form dynamics. Detailed research on the geomorphic and engineering history of a river is essential, therefore, if substantial changes and morphologic instabilities have occurred.
Xu, Yan; Cai, Yanpeng; Sun, Tao; Yin, Xin'An; Tan, Qian
2017-06-30
An integrated indicator system was developed for determining synthetic environmental responses under multiple types of coastal reclamation engineering in the Yellow River estuary, China. Four types of coastal engineering works were analyzed, namely port construction, petroleum exploitation, fishery and aquaculture, and seawall defense. In addition, two areas with limited human disturbances were considered for comparison. From the weights of the response value for each indicator, port construction was determined to be the primary impact contributor among the four engineering works studies. Specifically, hydrodynamic conditions, ecological status, economic costs, and engineering intensity were on average 72.78%, 65.03%, 75.03%, and 66.35% higher than those of other engineering types. Furthermore, fishery and aquaculture impact on water quality was 42.51% higher than that of other engineering types, whereas seawall defense impact on landscape variation was 51.75% higher than that of other engineering types. The proposed indicator system may provide effective coastal management in future. Copyright © 2017 Elsevier Ltd. All rights reserved.
Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam
NASA Astrophysics Data System (ADS)
Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.
2016-12-01
The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.
Storm-rhine -simulation Tool For River Management
NASA Astrophysics Data System (ADS)
Heun, J. C.; Schotanus, T. D.; de Groen, M. M.; Werner, M.
The Simulation Tool for River Management (STORM), based on the River Rhine case, aims to provide insight into river and floodplain management, by (1) raising aware- ness of river functions, (2) exploring alternative strategies, (3) showing the links be- tween natural processes, spatial planning, engineering interventions, river functions and stakeholder interests, (4) facilitating the debate between different policy makers and stakeholders from across the basin and (5) enhancing co-operation and mutual un- derstanding. The simulation game is built around the new concepts of SRoom for the & cedil;RiverT, Flood Retention Areas, Resurrection of former River Channels and SLiving & cedil;with the FloodsT. The Game focuses on the Lower and Middle Rhine from the Dutch Delta to Maxau in Germany. Influences from outside the area are included as scenarios for boundary conditions. The heart of the tool is the hydraulic module, which calcu- lates representative high- and low water-levels for different hydrological scenarios and influenced by river engineering measures and physical planning in the floodplains. The water levels are translated in flood risks, navigation potential, nature development and land use opportunities in the floodplain. Players of the Game represent the institutions: National, Regional, Municipal Government and Interest Organisations, with interests in flood protection, navigation, agriculture, urban expansion, mining and nature. Play- ers take typical river and floodplain engineering, physical planning and administrative measures to pursue their interests in specific river functions. The players are linked by institutional arrangements and budgetary constraints. The game particularly aims at middle and higher level staff of local and regional government, water boards and members of interest groups from across the basin, who deal with particular stretches or functions of the river but who need (1) to be better aware of the integrated whole, (2) to understand the interests and considerations of others and (3) to experience the mu- tual benefits of co-operation. There is potential for using the game as one of the tools in support of interactive formulation of policy and participatory decision-making in actual plans.
Evolution of Effluent Chemistry at Crystal Geyser, Green River, Utah
NASA Astrophysics Data System (ADS)
Han, W. S.; Park, E.; Choung, S.; Kim, C. Y.; Piao, J.; Han, G.
2016-12-01
Several cold-water geysers and springs are located adjacent to the Green River in Utah where two major east-west faults, the Little Grand Wash and the Salt Wash Graben faults, trend roughly parallel to each other. Among these springs and geysers is Crystal Geyser, located immediately north of the Little Grand Wash fault and approximately 6 km south of the town of Green River. In this study, the fluid mechanics of the regularly erupting Crystal Geyser was investigated by instrumenting its conduit with pressure, temperature, pH, EC, and dissolved oxygen sensors, measuring every 1 minute during and between eruptions. The single eruption cycle at Crystal geyser lasted over four days and was composed of four parts: Minor Eruption (mEP), Major Eruption (MEP), Aftershock Eruption (Ae) and Recharge (R). Current eruption patterns exhibit a bimodal distribution although previous measurements and anecdotal evidence suggests that this pattern was different prior to recent seismic activity. Based on chemical characteristics, the primary sourcing aquifers characterized to be both Entrada and Navajo Sandstones with minor contribution from Paradox Formation brine. Contemporaneously, dissolved ionic species vary 0-44% while transition from mEP, MEP and R even if the degree of changes was different from individual ion. Generally, Na+, K+, Cl- and SO42- regularly decrease at the onset and throughout the MEP. These species then increase in concentration during the mEP. Conversely, Ca2+, Mg2+, Fe2+ and Sr2+ decrease and increase in concentration during the MEP and mEP, respectively. Inverse geochemical modeling was conducted to characterize the contribution of Crystal geyser effluents from endmembers of Entrada Sandstone, Navajo Sandstone and Paradox Formations. Results of inverse modeling show that, during the mEP, the Navajo, Entrada and brine supply 62-65%, 33-36% and 1%, respectively. During the MEP, the contribution shifts to 53-56%, 42-45% and 1% for the Navajo, Entrada and Brine, respectively.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1970-03-01
The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Close, Devin W.; Paul, Craig Don; Langan, Patricia S.
In this paper, we describe the engineering and X-ray crystal structure of Thermal Green Protein (TGP), an extremely stable, highly soluble, non-aggregating green fluorescent protein. TGP is a soluble variant of the fluorescent protein eCGP123, which despite being highly stable, has proven to be aggregation-prone. The X-ray crystal structure of eCGP123, also determined within the context of this paper, was used to carry out rational surface engineering to improve its solubility, leading to TGP. The approach involved simultaneously eliminating crystal lattice contacts while increasing the overall negative charge of the protein. Despite intentional disruption of lattice contacts and introduction ofmore » high entropy glutamate side chains, TGP crystallized readily in a number of different conditions and the X-ray crystal structure of TGP was determined to 1.9 Å resolution. The structural reasons for the enhanced stability of TGP and eCGP123 are discussed. We demonstrate the utility of using TGP as a fusion partner in various assays and significantly, in amyloid assays in which the standard fluorescent protein, EGFP, is undesirable because of aberrant oligomerization.« less
Close, Devin W.; Paul, Craig Don; Langan, Patricia S.; ...
2015-05-08
In this paper, we describe the engineering and X-ray crystal structure of Thermal Green Protein (TGP), an extremely stable, highly soluble, non-aggregating green fluorescent protein. TGP is a soluble variant of the fluorescent protein eCGP123, which despite being highly stable, has proven to be aggregation-prone. The X-ray crystal structure of eCGP123, also determined within the context of this paper, was used to carry out rational surface engineering to improve its solubility, leading to TGP. The approach involved simultaneously eliminating crystal lattice contacts while increasing the overall negative charge of the protein. Despite intentional disruption of lattice contacts and introduction ofmore » high entropy glutamate side chains, TGP crystallized readily in a number of different conditions and the X-ray crystal structure of TGP was determined to 1.9 Å resolution. The structural reasons for the enhanced stability of TGP and eCGP123 are discussed. We demonstrate the utility of using TGP as a fusion partner in various assays and significantly, in amyloid assays in which the standard fluorescent protein, EGFP, is undesirable because of aberrant oligomerization.« less
Hot Spots from Generated Defects in HMX Crystals
NASA Astrophysics Data System (ADS)
Sorensen, Christian; Cummock, Nicholas; O'Grady, Caitlin; Gunduz, I. Emre; Son, Steven
2017-06-01
There are several hot spot initiation mechanisms that have been proposed. However, direct observation of shock or impact compression of these mechanisms at macroscopic scale in explosives is difficult. Phase contrast imaging (PCI) may be applied to these systems. Here, high-speed video was used to record optical spectrum and for x-ray Phase Contrast Imaging (PCI) of shockwave interaction with low defect HMX crystals and crystals with engineered defects. Additionally, multiple crystals were arranged and observed under shock loading with PCI and optical high-speed video. Sample preparation techniques for generating voids and other engineered defects will be discussed. These methods include drilled holes and laser machined samples. Insight into hot spot mechanisms was obtained. Funding from ONR's PC@Xtreme MURI.
NASA Technical Reports Server (NTRS)
Flegel, Ashlie B.; Oliver, Michael J.
2016-01-01
Preliminary results from the Heavily Instrumented ALF503R-5 Engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory will be discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This model engine, serial number LF01, was used during the inaugural icing test in the PSL facility. The reduction of thrust (rollback) events experienced by this engine in flight were replicated in the facility. Limited instrumentation was used to detect icing. Metal temperature on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect characterize ice accretion, and visualize the ice accretion in the region of interest.
USDA-ARS?s Scientific Manuscript database
The establishment of new approaches to control chewing insects has been sought not only for direct use in reducing crop loss but also in managing resistance to the pesticides already in use. Engineered formation of calcium oxalate crystals is a potential strategy that could be developed to fulfill ...
Photonically engineered incandescent emitter
Gee, James M.; Lin, Shawn-Yu; Fleming, James G.; Moreno, James B.
2003-08-26
A photonically engineered incandescence is disclosed. The emitter materials and photonic crystal structure can be chosen to modify or suppress thermal radiation above a cutoff wavelength, causing the emitter to selectively emit in the visible and near-infrared portions of the spectrum. An efficient incandescent lamp is enabled thereby. A method for fabricating a three-dimensional photonic crystal of a structural material, suitable for the incandescent emitter, is also disclosed.
Photonically Engineered Incandescent Emitter
Gee, James M.; Lin, Shawn-Yu; Fleming, James G.; Moreno, James B.
2005-03-22
A photonically engineered incandescence is disclosed. The emitter materials and photonic crystal structure can be chosen to modify or suppress thermal radiation above a cutoff wavelength, causing the emitter to selectively emit in the visible and near-infrared portions of the spectrum. An efficient incandescent lamp is enabled thereby. A method for fabricating a three-dimensional photonic crystal of a structural material, suitable for the incandescent emitter, is also disclosed.
1978-01-01
consequently accelerating the drainage of surface water into the Mississippi and its tributaries. 16 77 Although he considered levees responsible for the ...creation of the Mississippi River Commission in 1879. Its assigned functions included making surveys, plans, and estimates for improve- ments to "correct...along those great transportation arteries, St. Louis continues to depend on waterborne commerce for a large measure
K.L. Hatcher; J.A. Jones
2013-01-01
Large river basins transfer the water signal from the atmosphere to the ocean. Climate change is widely expected to alter streamflow and potentially disrupt water management systems. We tested the ecological resilienceâcapacity of headwater ecosystems to sustain streamflow under climate changeâand the engineering resilienceâcapacity of dam and reservoir management to...
Improving Lithium Therapeutics by Crystal Engineering of Novel Ionic Cocrystals
2013-01-01
Current United States Food and Drug Administration (FDA)-approved lithium salts are plagued with a narrow therapeutic window. Recent attempts to find alternative drugs have identified new chemical entities, but lithium’s polypharmacological mechanisms for treating neuropsychiatric disorders are highly debated and are not yet matched. Thus, re-engineering current lithium solid forms in order to optimize performance represents a low cost and low risk approach to the desired therapeutic outcome. In this contribution, we employed a crystal engineering strategy to synthesize the first ionic cocrystals (ICCs) of lithium salts with organic anions. We are unaware of any previous studies that have assessed the biological efficacy of any ICCs, and encouragingly we found that the new speciation did not negatively affect established bioactivities of lithium. We also observed that lithium ICCs exhibit modulated pharmacokinetics compared to lithium carbonate. Indeed, the studies detailed herein represent an important advancement in a crystal engineering approach to a new generation of lithium therapeutics. PMID:24191685
Improving lithium therapeutics by crystal engineering of novel ionic cocrystals.
Smith, Adam J; Kim, Seol-Hee; Duggirala, Naga K; Jin, Jingji; Wojtas, Lukasz; Ehrhart, Jared; Giunta, Brian; Tan, Jun; Zaworotko, Michael J; Shytle, R Douglas
2013-12-02
Current United States Food and Drug Administration (FDA)-approved lithium salts are plagued with a narrow therapeutic window. Recent attempts to find alternative drugs have identified new chemical entities, but lithium's polypharmacological mechanisms for treating neuropsychiatric disorders are highly debated and are not yet matched. Thus, re-engineering current lithium solid forms in order to optimize performance represents a low cost and low risk approach to the desired therapeutic outcome. In this contribution, we employed a crystal engineering strategy to synthesize the first ionic cocrystals (ICCs) of lithium salts with organic anions. We are unaware of any previous studies that have assessed the biological efficacy of any ICCs, and encouragingly we found that the new speciation did not negatively affect established bioactivities of lithium. We also observed that lithium ICCs exhibit modulated pharmacokinetics compared to lithium carbonate. Indeed, the studies detailed herein represent an important advancement in a crystal engineering approach to a new generation of lithium therapeutics.
Goldstein, F.J.; Weight, W.D.
1982-01-01
The Idaho National Engineering Laboratory (INEL) covers about 890 square miles of the eastern Snake River Plain, in southeastern Idaho. The eastern Snake River Plain is a structural basin which has been filled with thin basaltic lava flows, rhyolitic deposits, and interbedded sediments. These rocks form an extensive ground-water reservoir known as the Snake River Plain aquifer. Six wells were drilled and two existing wells were deepened at the INEL from 1969 through 1974. Interpretation of data from the drilling program confirms that the subsurface is dominated by basalt flows interbedded with layers of sediment, cinders, and silicic volcanic rocks. Water levels in the wells show cyclic seasonal fluctuations of maximum water levels in winter and minimum water levels in mid-summer. Water levels in three wells near the Big Lost River respond to changes in recharge to the Snake River Plain aquifer from the Big Lost River. Measured water levels in multiple piezometers in one well indicate increasing pressure heads with depth. A marked decline in water levels in the wells since 1977 is attributed to a lack of recharge to the Snake River Plain aquifer.
This study evaluates the impacts of future land use changes on flooding in the Kansas River Basin. It also studies the impacts of wetlands on flood reduction. The study presents Hydrologic Engineering Centers-Hydrologic Modeling System (HEC-HMS) based runoff modeling and River A...
How great a thirst? Assembling a river restoration toolkit
Steve Harris
1999-01-01
The Rio Grande River's biologically troubled status is clearly linked to present and historic water management. To restore the river to pre-settlement conditions will take a "tool kit" that holds authorities, knowledge, and skills needed to correct historical neglect and abuse. Tools include awareness, planning, partnerships, engineering solutions, and a...
A framework for evaluating disciplinary contributions to river restoration
G. E. Grant
2008-01-01
As river restoration has matured into a global-scale intervention in rivers, a broader range of technical disciplines are informing restoration goals, strategies, approaches, and methods. The ecological, geomotphological, hydrological, and engineering sciences each bring a distinct focus and set of perspectives and tools, and are themselves embedded in a larger context...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
Protein-directed self-assembly of a fullerene crystal.
Kim, Kook-Han; Ko, Dong-Kyun; Kim, Yong-Tae; Kim, Nam Hyeong; Paul, Jaydeep; Zhang, Shao-Qing; Murray, Christopher B; Acharya, Rudresh; DeGrado, William F; Kim, Yong Ho; Grigoryan, Gevorg
2016-04-26
Learning to engineer self-assembly would enable the precise organization of molecules by design to create matter with tailored properties. Here we demonstrate that proteins can direct the self-assembly of buckminsterfullerene (C60) into ordered superstructures. A previously engineered tetrameric helical bundle binds C60 in solution, rendering it water soluble. Two tetramers associate with one C60, promoting further organization revealed in a 1.67-Å crystal structure. Fullerene groups occupy periodic lattice sites, sandwiched between two Tyr residues from adjacent tetramers. Strikingly, the assembly exhibits high charge conductance, whereas both the protein-alone crystal and amorphous C60 are electrically insulating. The affinity of C60 for its crystal-binding site is estimated to be in the nanomolar range, with lattices of known protein crystals geometrically compatible with incorporating the motif. Taken together, these findings suggest a new means of organizing fullerene molecules into a rich variety of lattices to generate new properties by design.
1. Front view of steam engine and mill, looking NE, ...
1. Front view of steam engine and mill, looking NE, showing (l to r) 6-column beam engine, flywheel, reduction gears and 3-roll cane mill. - Hacienda Azucarera La Esperanza, Steam Engine & Mill, 2.65 Mi. N of PR Rt. 2 Bridge over Manati River, Manati, Manati Municipio, PR
The founding of ISOTT: the Shamattawa of engineering science and medical science.
Bruley, Duane F
2014-01-01
The founding of ISOTT was based upon the blending of Medical and Engineering sciences. This occurrence is portrayed by the Shamattawa, the joining of the Chippewa and Flambeau rivers. Beginning with Carl Scheele's discovery of oxygen, the medical sciences advanced the knowledge of its importance to physiological phenomena. Meanwhile, engineering science was evolving as a mathematical discipline used to define systems quantitatively from basic principles. In particular, Adolf Fick's employment of a gradient led to the formalization of transport phenomena. These two rivers of knowledge were blended to found ISOTT at Clemson/Charleston, South Carolina, USA, in 1973.The establishment of our society with a mission to support the collaborative work of medical scientists, clinicians and all disciplines of engineering was a supporting step in the evolution of bioengineering. Traditional engineers typically worked in areas not requiring knowledge of biology or the life sciences. By encouraging collaboration between medical science and traditional engineering, our society became one of the forerunners in establishing bioengineering as the fifth traditional discipline of engineering.
Global Analysis of River Planform Change using the Google Earth Engine
NASA Astrophysics Data System (ADS)
Bryk, A.; Dietrich, W. E.; Gorelick, N.; Sargent, R.; Braudrick, C. A.
2014-12-01
Geomorphologists have historically tracked river dynamics using a combination of maps, aerial photographs, and the stratigraphic record. Although stratigraphic records can extend into deep time, maps and aerial photographs often confine our record of change to sparse measurements over the last ~80 years and in some cases much less time. For the first time Google's Earth Engine (GEE) cloud based platform allows researchers the means to analyze quantitatively the pattern and pace of river channel change over the last 30 years with high temporal resolution across the entire planet. The GEE provides an application programing interface (API) that enables quantitative analysis of various data sets including the entire Landsat L1T archive. This allows change detection for channels wider than about 150 m over 30 years of successive, georeferenced imagery. Qualitatively, it becomes immediately evident that the pace of channel morphodynamics for similar planforms varies by orders of magnitude across the planet and downstream along individual rivers. To quantify these rates of change and to explore their controls we have developed methods for differentiating channels from floodplain along large alluvial rivers. We introduce a new metric of morphodynamics: the ratio of eroded area to channel area per unit time, referred to as "M". We also keep track of depositional areas resulting from channel shifting. To date our quantitative analysis has focused on rivers in the Andean foreland. Our analysis shows channel bank erosion rates, M, varies by orders of magnitude for these rivers, from 0 to ~0.25 yr-1, yet these rivers have essentially identical curvature and sinuosity and are visually indistinguishable. By tracking both bank paths in time, we find that, for some meandering rivers, a significant fraction of new floodplain is produced through outer-bank accretion rather than point bar deposition. This process is perhaps more important in generating floodplain stratigraphy than previously recognized. These initial findings indicate a new set of quantitative observations will emerge to further test and advance morphodynamic theory. The Google Earth Engine offers the opportunity to explore river morphodynamics on an unprecedented scale and provides a powerful tool for addressing fundamental questions in river morphodynamics.
NASA Astrophysics Data System (ADS)
Jugie, Marion; Gob, Frédéric; Slawson, Deborah; Le-Coeur, Charles
2014-05-01
The EU Water Framework Directive (WFD, October 2000) mandated that the Member States of the European Union achieve the general objective of protection of aquatic ecology by 2015. European rivers and streams have to attain "good ecological status" through the preservation and restoration of aquatic environments. Member will have to ensure environmental continuity through "the adequate distribution of fish species and transport of sediments". In France, more than 61,000 transverse structures - mill dams, weirs, diversion gates - have been identified on rivers as being obstacles to ecological and sedimentary continuity. Because of their historical occupation by societies, rivers flowing in the Paris area have long been anthropized and artificialized. River courses, channel shape, sediment transport and hydrological regime modifications have tremendously transformed the hydrosystems surrounding the city of Paris. The Merantaise's catchment is one of this low energy river watershed, near Paris, that have been modified by historical engineering, especially during medieval-modern times and by the building of the Versailles Castle (XVIIth century). The hydraulic infrastructures are still there and impact the hydromorphogical conditions of the river (incision, lateral erosion, …). In addition to these ancient pressures a rapid and massive urbanization of the suburban areas has applied a new type of constraint to the hydrosystems in recent decades. This undermines the balance that was established following ancient engineering and disturbs the current functioning of the valley. These new types of land occupation have significantly altered the ecological circumstances and transformed the hydrological responses of rivers. In this study, we therefore seek to understand these processes of successive adjustments (ancient and recent) of a small river from the urban margins of the Orge watershed (to the south of Paris). We use a multi-scalar spatial and temporal approach to reconstruct the hydromorphological circumstances ancient and current, by hydrological chronicles and archives documentation.
Mixed Phase Modeling in GlennICE with Application to Engine Icing
NASA Technical Reports Server (NTRS)
Wright, William B.; Jorgenson, Philip C. E.; Veres, Joseph P.
2011-01-01
A capability for modeling ice crystals and mixed phase icing has been added to GlennICE. Modifications have been made to the particle trajectory algorithm and energy balance to model this behavior. This capability has been added as part of a larger effort to model ice crystal ingestion in aircraft engines. Comparisons have been made to four mixed phase ice accretions performed in the Cox icing tunnel in order to calibrate an ice erosion model. A sample ice ingestion case was performed using the Energy Efficient Engine (E3) model in order to illustrate current capabilities. Engine performance characteristics were supplied using the Numerical Propulsion System Simulation (NPSS) model for this test case.
Chase, Katherine J.
2014-01-01
Major floods in 1996 and 1997 intensified public debate about the effects of human activities on the Yellowstone River. In 1999, the Yellowstone River Conservation District Council was formed to address conservation issues on the river. The Yellowstone River Conservation District Council partnered with the U.S. Army Corps of Engineers to carry out a cumulative effects study on the main stem of the Yellowstone River. The cumulative effects study is intended to provide a basis for future management decisions within the watershed. Streamflow statistics, such as flow-frequency data calculated for unregulated and regulated streamflow conditions, are a necessary component of the cumulative effects study. The U.S. Geological Survey, in cooperation with the Yellowstone River Conservation District Council and the U.S. Army Corps of Engineers, calculated low-flow frequency data and general monthly and annual statistics for unregulated and regulated streamflow conditions for the Upper Yellowstone and Bighorn Rivers for the 1928–2002 study period; these data are presented in this report. Unregulated streamflow represents flow conditions during the 1928–2002 study period if there had been no water-resources development in the Yellowstone River Basin. Regulated streamflow represents estimates of flow conditions during the 1928–2002 study period if the level of water-resources development existing in 2002 was in place during the entire study period.
Mosaic anisotropy model for magnetic interactions in mesostructured crystals
NASA Astrophysics Data System (ADS)
Goldman, Abby R.; Asenath-Smith, Emily; Estroff, Lara A.
2017-10-01
We propose a new model for interpreting the magnetic interactions in crystals with mosaic texture called the mosaic anisotropy (MA) model. We test the MA model using hematite as a model system, comparing mosaic crystals to polycrystals, single crystal nanoparticles, and bulk single crystals. Vibrating sample magnetometry confirms the hypothesis of the MA model that mosaic crystals have larger remanence (Mr/Ms) and coercivity (Hc) compared to polycrystalline or bulk single crystals. By exploring the magnetic properties of mesostructured crystalline materials, we may be able to develop new routes to engineering harder magnets.
NASA Technical Reports Server (NTRS)
Arakere, N. K.; Swanson, G.
2002-01-01
High cycle fatigue (HCF) induced failures in aircraft gas turbine and rocket engine turbopump blades is a pervasive problem. Single crystal nickel turbine blades are being utilized in rocket engine turbopumps and jet engines throughout industry because of their superior creep, stress rupture, melt resistance, and thermomechanical fatigue capabilities over polycrystalline alloys. Currently the most widely used single crystal turbine blade superalloys are PWA 1480/1493, PWA 1484, RENE' N-5 and CMSX-4. These alloys play an important role in commercial, military and space propulsion systems. Single crystal materials have highly orthotropic properties making the position of the crystal lattice relative to the part geometry a significant factor in the overall analysis. The failure modes of single crystal turbine blades are complicated to predict due to the material orthotropy and variations in crystal orientations. Fatigue life estimation of single crystal turbine blades represents an important aspect of durability assessment. It is therefore of practical interest to develop effective fatigue failure criteria for single crystal nickel alloys and to investigate the effects of variation of primary and secondary crystal orientation on fatigue life. A fatigue failure criterion based on the maximum shear stress amplitude /Delta(sub tau)(sub max))] on the 24 octahedral and 6 cube slip systems, is presented for single crystal nickel superalloys (FCC crystal). This criterion reduces the scatter in uniaxial LCF test data considerably for PWA 1493 at 1200 F in air. Additionally, single crystal turbine blades used in the alternate advanced high-pressure fuel turbopump (AHPFTP/AT) are modeled using a large-scale three-dimensional finite element model. This finite element model is capable of accounting for material orthotrophy and variation in primary and secondary crystal orientation. Effects of variation in crystal orientation on blade stress response are studied based on 297 finite element model runs. Fatigue lives at critical points in the blade are computed using finite element stress results and the failure criterion developed. Stress analysis results in the blade attachment region are also presented. Results presented demonstrates that control of secondary and primary crystallographic orientation has the potential to significantly increase a component S resistance to fatigue crack growth with- out adding additional weight or cost. [DOI: 10.1115/1.1413767
Bio-inspired band gap engineering of zinc oxide by intracrystalline incorporation of amino acids.
Brif, Anastasia; Ankonina, Guy; Drathen, Christina; Pokroy, Boaz
2014-01-22
Bandgap engineering of zinc oxide semiconductors can be achieved using a bio-inspired method. During a bioInspired crystallization process, incorporation of amino acids into the crystal structure of ZnO induces lattice strain that leads to linear bandgap shifts. This allows for fine tuning of the bandgap in a bio-inspired route. © 2013 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Corrosion engineering in the utilization of the Raft River geothermal resource
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, R.L.
1976-08-01
The economic impact of corrosion and the particular problems of corrosion in the utilization of geothermal energy resources are noted. Corrosion is defined and the parameters that control corrosion in geothermal systems are discussed. A general background of corrosion is presented in the context of the various forms of corrosion, in relation to the Raft River geothermal system. A basic reference for mechanical design engineers involved in the design of geothermal energy recovery systems is provided.
NASA Astrophysics Data System (ADS)
Stone, M. C.; Byrne, C.; Morrison, R.
2015-12-01
It is widely recognized that past river engineering, flood control, and floodplain development activities have tended to work against nature rather than with it. The consequence in many cases has been severe degradation of our natural ecosystems. This, combined with an increased appreciation for the benefits of properly functioning ecosystems, has prompted efforts to restore rivers to a more natural state. However, most restoration projects currently focus on a narrow set of goals, such as endangered species recovery or channel stabilization. In order to shift the restoration community towards more holistic perspectives and approaches, it is necessary to improve understanding of river and floodplain hydrogeomorphic processes and their role in supporting healthy ecosystems. The goal of this research was to investigate the impacts of river engineering and restoration practices on the process of floodwave attenuation. This goal was addressed through numerical investigations that allowed us to: (1) quantify mass and momentum fluxes between river channels and floodplains; (2) investigate the influence of mass and momentum fluxes on floodwave attenuation processes; and (3) evaluate the impacts of river and floodplain restoration on floodwave attenuation. Two-dimensional hydrodynamic models were applied to the Rio Grande, San Joaquin, and Gila rivers in the Southwestern United States using novel modeling approaches to describe dynamic floodplain roughness, fluxes at channel/floodplain interfaces, and attenuation along river corridors. The results provide important insights into the role of floodplain characteristics on floodwave movement and the potential for enhancing floodwave attenuation through river restoration.
Geology of the Canyon Reservoir site on the Guadalupe River, Comal County, Texas
George, William O.; Welder, Frank A.
1955-01-01
In response to a request by Colonel Harry O. Fisher, District Engineer of the Fort Worth District of the Corps of Engineers, United States Army (letter of Dec. 13, 1954), a reconnaissance investigation was made of the geology of the Canyon (F-1) reservoir site on the Guadalupe River in Comal County, Tex. The purpose of the investigation was to study the geology in relation to possible leakage - particularly leakage of water that might then be lost from the drainage area of the Guadalupe River - and to add to the general knowledge of the ground-water hydrology of the San Antonio area. The dam (F-1) was originally designed for flood control and conservation only, with provision for the addition of a power unit if feasible. Since the completion of the investigation by the Corps of Engineers, the city of San Antonio has expressed an interest in the reservoir as a possible source of public water supply. The Corps of Engineers has made a thorough engineering and geologic study of the dam site (Corps of Engineers, 1950), which has Congressional approval. The geology and water resources of Comal County have been studied by George (1952). The rocks studied are those within the reservoir area and generally below the 1,000-foot contour as shown on the Smithson Valley quadrangle of the U.S. Geological Survey.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... Ice Crystal Icing Conditions AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of... airplanes most affected by these icing conditions, mixed phase and ice crystal conditions for all transport category airplanes, and supercooled large drop, mixed phase, and ice crystal icing conditions for all...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... of Engineers' scheduled maintenance shutdown of Barrier IIB. During the enforcement period, entry...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... the U.S. Army Corps of Engineers' maintenance operations of dispersal barrier IIB. During these...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... Corps of Engineers' post-maintenance testing of Barrier IIA and IIB. During the enforcement period...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2013 CFR
2013-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2012 CFR
2012-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2014 CFR
2014-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2011 CFR
2011-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Mississippi River Water Control Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Mississippi River Water Control Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This...
Lehigh River Basin, Hydropower Study. Stage 1. Reconnaissance Report.
1980-09-01
Works and Transportation of the U.S. House of Representatives adopted a resolution authorizing the Board of Engineers for Rivers and Harbors to review... Transportation . Early transportation was difficult. The first settlers relied on Indian trails and both rivers for travel. The first road was laid in...1735 and others quickly followed, but the rivers were the roads during much of the 1700’s. Rafts and dugout canoes transported settlers and their farm
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing detail of floor beam at central pier, half section of cantilever slab at end of bridge, floor beam end panels, slab reinforcing, plan of slab reinforcing, diagram of slab bars, typical floor girder. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
Historical Sediment Sources and Delivery on the Lower Mississippi River
NASA Astrophysics Data System (ADS)
Dahl, T. A.; Biedenharn, D. S.; Little, C. D.
2015-12-01
The development of the Lower Mississippi River (LMR) and its floodplain for navigation and flood control has been ongoing since the 18th century, with the most concerted efforts occurring as a result of the Flood Control Act (FCA) of 1928 following the Great Flood of 1927. The Mississippi River and Tributaries (MR&T) Project that was spawned from the FCA of 1928 has produced a massive, comprehensive system for flood control and channel stabilization that includes levees, channel improvements, and floodways, as well as tributary reservoirs and other basin improvements. Additionally, the development of the river for safe and dependable navigation has generated a substantial engineering effort involving river training structures, meander cutoffs, and dredging. The historical, and present-day morphology of the LMR reflects an integration of all these engineering interventions (and the process-responses they have triggered in the fluvial system), combined with natural drivers of channel change and evolution, including floods and droughts, hurricanes, neotectonic activity, geologic outcrops, climate change, and relative sea-level rise. In response to the complex requirements in navigation, flood risk reduction, and environmental restoration, all with multiple stakeholders, the U.S. Army Corps of Engineers created the Mississippi River Geomorphology & Potamology (MRG&P) Program. The goals of the MRG&P are to advance the knowledge of the geomorphology of the LMR and to transfer this technology to improve and sustain long-term management of the system. The results presented herein come from several MRG&P studies. The historical river morphology, and particularly the sources and delivery of sediments have changed dramatically over the past two centuries. In this presentation, the changes in sediment sources, and the manner in which this sediment is delivered through the channel system from the early 1800s to present-day is described.
Sele coastal plain flood risk due to wave storm and river flow interaction
NASA Astrophysics Data System (ADS)
Benassai, Guido; Aucelli, Pietro; Di Paola, Gianluigi; Della Morte, Renata; Cozzolino, Luca; Rizzo, Angela
2016-04-01
Wind waves, elevated water levels and river discharge can cause flooding in low-lying coastal areas, where the water level is the interaction between wave storm elevated water levels and river flow interaction. The factors driving the potential flood risk include weather conditions, river water stage and storm surge. These data are required to obtain inputs to run the hydrological model used to evaluate the water surface level during ordinary and extreme events regarding both the fluvial overflow and storm surge at the river mouth. In this paper we studied the interaction between the sea level variation and the river hydraulics in order to assess the location of the river floods in the Sele coastal plain. The wave data were acquired from the wave buoy of Ponza, while the water level data needed to assess the sea level variation were recorded by the tide gauge of Salerno. The water stages, river discharges and rating curves for Sele river were provided by Italian Hydrographic Service (Servizio Idrografico e Mareografico Nazionale, SIMN).We used the dataset of Albanella station (40°29'34.30"N, 15°00'44.30"E), located around 7 km from the river mouth. The extreme river discharges were evaluated through the Weibull equation, which were associated with their return period (TR). The steady state river water levels were evaluated through HEC-RAS 4.0 model, developed by Hydrologic Engineering Center (HEC) of the United States Army Corps of Engineers Hydrologic Engineering Center (USACE,2006). It is a well-known 1D model that computes water surface elevation (WSE) and velocity at discrete cross-sections by solving continuity, energy and flow resistance (e.g., Manning) equation. Data requirements for HEC-RAS include topographic information in the form of a series of cross-sections, friction parameter in the form of Manning's n values across each cross-section, and flow data including flow rates, flow change locations, and boundary conditions. For a steady state sub-critical simulation, the boundary condition is a known downstream WSE, in this case the elevated water level due to wave setup, wind setup and inverted barometer, while the upstream boundary condition consisted in WSE corresponding to river discharges associated to different return periods. The results of the simulations evidence, for the last 10 kilometers of the river, the burst of critical inundation scenarios even with moderate flow discharge, if associated with concurrent storm surge which increase the water level at the river mouth, obstructing normal flow discharge.
Preliminary Results from Pyroelectric Crystal Accelerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Tom; Edwards, Ronald; Bright, Kevin
The Nuclear Science and Engineering Research Center (NSERC), a Defense Threat Reduction Agency (DTRA) office located at the United States Military Academy (USMA), sponsors and manages cadet and faculty research in support of DTRA objectives. Cadets in the Department of Physics and Nuclear Engineering at USMA are using pyroelectric crystals to ionize and accelerate residual gas trapped inside a vacuum system. A system using two lithium tantalate crystals with associated diagnostics was designed and is now operational. X-ray energies of approximately 150 keV have been achieved. Future work will focus on developing a portable neutron generator using the D-D nuclearmore » fusion process.« less
NASA Astrophysics Data System (ADS)
Zisis, G.; Martinez-Jimenez, G.; Franz, Y.; Healy, N.; Masaud, T. M.; Chong, H. M. H.; Soergel, E.; Peacock, A. C.; Mailis, S.
2017-08-01
We report laser-induced poling inhibition and direct poling in lithium niobate crystals (LiNbO3), covered with an amorphous silicon (a-Si) light-absorbing layer, using a visible (488 nm) continuous wave laser source. Our results show that the use of the a-Si overlayer produces deeper poling inhibited domains with minimum surface damage, as compared to previously reported UV laser writing experiments on uncoated crystals, thus increasing the applicability of this method in the production of ferroelectric domain engineered structures for nonlinear optical applications. The characteristics of the poling inhibited domains were investigated using differential etching and piezoresponse force microscopy.
Community and Institutional Adaptation to Riverbank Erosion along the Jamuna River, Bangladesh
NASA Astrophysics Data System (ADS)
Ali, F. M. M.
2009-04-01
The paper examines adaptation to the river erosion hazard in Bangladesh through its most exacting river, the braided Jamuna. The Jamuna River has destroyed and continues to threaten significant areas of settlements, farmed land and infrastructure. Local communities experience a social disintegration and pauperisation which lasts for generations. Although advanced for several decades, the public engineering effort to mitigate the erosion is piecemeal and has had limited success to date. The research takes an interdisciplinary approach to the hazard, in both content and method. Using Remote Sensing data to distinguish regions of dormant, explosive, minimal and constant erosion, the physical morphology of the river is linked to the community adaptation through the creation of PPGIS mapping depicting historical institutional displacement. This spatial information is linked to the qualitative investigation focusing on the expression of values in adaptation by examining social structures and investigating technological development. Drawing on Bourdieu's ideas of fields, capital and habitus, interview data is gathered from: displacees; local elites; the engineering-science community; and the political-administrative structure. The analysis is conducted along four themes; the spatial history of community displacement; social values; institutional operation; and learning in practice. Findings show the marked persistence of displaced local institutions. Dormant erosion zones host the most displaced institutions, acting as refuges once the risk is lowered through engineering or serendipity. The non-material values deeply impacted by the hazard underpin the strong local aspiration for engineering intervention. However, political discontinuity, associated institutional instability and spatial biasing of construction hinders the success of erosion mitigation and the development of appropriate national technological expertise. The small national economic resource base, shortsighted negotiations with international lenders and reduced public confidence in water sector engineering are also confounding factors. Evidence suggests that social and technological progress occurs when values, institutional results and political commitment align.
DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Haas, Justin D.; Mestl, Gerald E.
2012-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2010 scope of work primarily address spawning as a probable factor limiting pallid sturgeon survival and recovery, although limited pilot studies also have been initiated to examine the requirements of early life stages. The research is designed to inform management decisions affecting channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2010.
NASA Astrophysics Data System (ADS)
Grunder, A.; Moore, N. E.; Bohrson, W. A.
2015-12-01
The Steens Basalts (~16.7 Ma), the oldest and most mafic stage of Columbia River flood basalt volcanism, are known for lavas with conspicuous giant plagioclase laths (2 - 5 cm in diameter). Such flows are intercalated with ones that are nearly aphyric or that bear plagioclase (plag) phenocrysts of 0.5-2 cm. Addition textures are distinctive radial, snowflake plag clusters and sandwich glomerocrysts of plag, with olivine trapped between laths. These clusters and glomerocrysts are typically 1, but as large as 3 cm in diameter. Plag composition of all textural types is limited (An76-60). Plag dominates the phenocryst mode; rare flows, mainly low in the section, have olivine > plag and phenocrystic clinopyroxene occurs rarely, and mainly high in the section. Unlike the flows, dikes have few phenocrysts; giant laths are rare and the snowflake texture has not been observed. Giant plag laths are euhedral and make up a few percent to more than 50% of the rock. Many plag megacrysts are made of several plag crystals that form a mosaic, where the constituent crystals are crystallographically distinct and are overgrown with feldspar to make the crystal euhedral. We describe these composite megacrysts as "mosaicrysts". We are exploring magmatic conditions that would trigger oversaturation to spawn rapid growth yielding clusters and overgrowths that form mosaicrysts. Giant plagioclase basalts (so-called GPB) are also described for the Deccan and Emeishan flood basalt provinces attesting to similar magmatic processes. Plag laths typically define strong flow foliation at the flow base, have a swirled distribution in the flow core, and are sparse in the top. Some particularly crystal-rich flows (or sills) have an abrupt transition to a crystal-poor upper few decimeters of the several-m- thick flow. We interpret the crystal-poor top to be the expelled melt from crystal accumulation in the flow, which locally reinjects and is entrained in lower crystal mush.
16. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. MECHANICAL ...
16. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. MECHANICAL AND HYDRAULIC ENGINEERS EXAMINING MODEL PUMPS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
19. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ELECTRONICS ...
19. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ELECTRONICS ENGINEER AT DATA COLLECTION COMPUTER ROOM. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
Cocrystal habit engineering to improve drug dissolution and alter derived powder properties.
Serrano, Dolores R; O'Connell, Peter; Paluch, Krzysztof J; Walsh, David; Healy, Anne Marie
2016-05-01
Cocrystallization of sulfadimidine (SDM) with suitable coformers, such as 4-aminosalicylic acid (4-ASA), combined with changes in the crystal habit can favourably alter its physicochemical properties. The aim of this work was to engineer SDM : 4-ASA cocrystals with different habits to investigate the effect on dissolution, and the derived powder properties of flow and compaction. Cocrystals were prepared in a 1 : 1 molar ratio by solvent evaporation using ethanol (habit I) or acetone (habit II), solvent evaporation followed by grinding (habit III) and spray drying (habit IV). Powder X-ray diffraction showed Bragg peak position was the same in all the solid products. The peak intensity varied, indicating different preferred crystal orientation confirmed by SEM micrographs: large prismatic crystals (habit I), large plate-like crystals (habit II), small cube-like crystals (habit III) and microspheres (habit IV). The habit III exhibited the fasted dissolution rate; however, it underwent a polymorphic transition during dissolution. Habits I and IV exhibited the highest Carr's compressibility index, indicating poor flowability. However, habits II and III demonstrated improved flow. Spray drying resulted in cocrystals with improved compaction properties. Even for cocrystals with poor pharmaceutical characteristics, a habit can be engineered to alter the dissolution, flowability and compaction behaviour. © 2015 Royal Pharmaceutical Society.
Chester River Study. Volume I,
1972-11-01
of the effects of agri- i6 IA -46 cultural activities on the aquatic system. This initial feet (24 meters). The soils of the basin area are suit...to the stocks themselves. The shell crystal struc- ture modification in oysters recalls to mind the eggshell thinning in birds mentioned earlier...with figures provided by Chestertown to the mouth of the River at Love the U.S. Soil Conservation Service as of 1967 (last Point (Table VII). year of
Climatic and anthropogenic controls on Mississippi River floods: a multi-proxy palaeoflood approach
NASA Astrophysics Data System (ADS)
Munoz, S. E.; Therrell, M. D.; Remo, J. W.; Giosan, L.; Donnelly, J. P.
2017-12-01
Over the last century, many of the world's major rivers have been modified for the purposes of flood mitigation, power generation, and commercial navigation. Engineering modifications to the Mississippi River system have altered the river's sediment budget and channel morphology, but the influence of these modifications on flood risk is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability prior to the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood risk on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño-Southern Oscillation (ENSO) and the Atlantic Multidecadal Oscillation (AMO), but that artificial channelization has greatly amplified flood magnitudes over the last century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the last five hundred years that combines sedimentary, tree-ring, and instrumental records, reveal that the magnitude of the 100-year flood has increased by 20% over the period of record, with 75% of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood risk to levels that are unprecedented within the last five centuries.
Change In Course Pattern Of The Teesta River: After Effect Of An Engineering Project
NASA Astrophysics Data System (ADS)
Ashrafi, Z. M.; Shuvo, S. D.; Mahmud, M. S.
2016-12-01
Bangladesh is blessed by rivers that contribute to country's agriculture, landscape development and water supply. Due to nature of the river's flow and morphology, several engineering project have been initiated to enhance its utility, Teesta barrage was one of them. After two decades of its construction in Northern Bangladesh, several study identified major impacts on local ecosystem due to hindrance in water flow. However, how Teesta River evolved in last 25 years after the barrage construction, has not been quantified yet. This study quantifies the downstream evolution of Teesta River in after-construction period (1990-2015). Time series earth observation satellite (Landsat) data and geo-spatial techniques have been utilized to understand the changes in course pattern. Besides, sinuosity index has been used to quantify it. Analysis shows that the river is becoming more braided with the rise of numerous `Char' areas (islands); as well as bifurcation of the main channel, creating newer channels increasingly. Statistically significant changes in Sinuosity Index (SI) of the Teesta river has found in post construction period. In some locations SI increased which indicate that the river is becoming more and more winding than straight it used to be around 1990. It is also found that the river is shifting towards the east where the number of human settlement is higher. The rate of shifting has accelerated during the 2000s. There are places where the course has moved about 3 kilometers from its earlier course. Therefore, higher number of human settlements are in threat of river bank erosion in recent years. River bank management should be developed considering the pattern of course change so that rural settlement can save from destructive river bank erosion.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
..., LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bossier Parish, near the Town of Ninock, Louisiana. The proposed...
The Built Environment of Cold War Era Servicewomen
2006-08-01
60 Figure 51. WAVES at work on engine maintenance, Naval Air Station Banana River, FL, 30 August 1944...Naval Air Station Banana River, FL, 30 Aug. 1944 (NARA, RG 80-G Box 758, 244458... Banana River, FL, 30 August 1944 (NARA, RG 80-G Box 758, 244460). ERDC/CERL M-06-2 61 Figure 52. WAVES packing parachutes, Naval Air Station
Musser, Jonathan W.
2018-01-31
Digital flood-inundation maps for a 12.6-mile reach of the Withlacoochee River from Skipper Bridge Road to St. Augustine Road (Georgia State Route 133) were developed to depict estimates of the areal extent and depth of flooding corresponding to selected water levels (stages) at the U.S. Geological Survey (USGS) streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483). Real-time stage information from this streamgage can be used with these maps to estimate near real-time areas of inundation. The forecasted peak-stage information for the USGS streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483), can be used in conjunction with the maps developed for this study to show predicted areas of flood inundation.A one-dimensional step-backwater model was developed using the U.S. Army Corps of Engineers Hydrologic Engineer-ing Center’s River Analysis System (HEC–RAS) software for the Withlacoochee River and was used to compute flood profiles for a 12.6-mile reach of the Withlacoochee River. The hydraulic model was then used to simulate 23 water-surface profiles at 1.0-foot (ft) intervals at the Withlacoochee River near the Bemiss streamgage. The profiles ranged from the National Weather Service action stage of 10.7 ft, which is 131.0 ft above the North American Vertical Datum of 1988 (NAVD 88), to a stage of 32.7 ft, which is 153.0 ft above NAVD 88. The simulated water-surface profiles were then combined with a geographic information system digital elevation model—derived from light detection and ranging (lidar) data having a 4.0-ft horizontal resolution—to delineate the area flooded at each 1.0-ft interval of stream stage.
NASA Astrophysics Data System (ADS)
Naillon, A.; Joseph, P.; Prat, M.
2018-01-01
The stress generation on pore walls due to the growth of a sodium chloride crystal in a confined aqueous solution is studied from evaporation experiments in microfluidic channels in conjunction with numerical computations of crystal growth. The study indicates that the stress buildup on the pore walls is a highly transient process taking place over a very short period of time (in less than 1 s in our experiments). The analysis makes clear that what matters for the stress generation is not the maximum supersaturation at the onset of the crystal growth but the supersaturation at the interface between the solution and the crystal when the latter is about to be confined between the pore walls. The stress generation is summarized in a simple stress diagram involving the pore aspect ratio and the Damkhöler number characterizing the competition between the precipitation reaction kinetics and the ion transport towards the growing crystal. This opens up the route for a better understanding of the damage of porous materials induced by salt crystallization, an important issue in Earth sciences, reservoir engineering, and civil engineering.
Nonlinear coherent structures in granular crystals
NASA Astrophysics Data System (ADS)
Chong, C.; Porter, Mason A.; Kevrekidis, P. G.; Daraio, C.
2017-10-01
The study of granular crystals, which are nonlinear metamaterials that consist of closely packed arrays of particles that interact elastically, is a vibrant area of research that combines ideas from disciplines such as materials science, nonlinear dynamics, and condensed-matter physics. Granular crystals exploit geometrical nonlinearities in their constitutive microstructure to produce properties (such as tunability and energy localization) that are not conventional to engineering materials and linear devices. In this topical review, we focus on recent experimental, computational, and theoretical results on nonlinear coherent structures in granular crystals. Such structures—which include traveling solitary waves, dispersive shock waves, and discrete breathers—have fascinating dynamics, including a diversity of both transient features and robust, long-lived patterns that emerge from broad classes of initial data. In our review, we primarily discuss phenomena in one-dimensional crystals, as most research to date has focused on such scenarios, but we also present some extensions to two-dimensional settings. Throughout the review, we highlight open problems and discuss a variety of potential engineering applications that arise from the rich dynamic response of granular crystals.
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
NASA Astrophysics Data System (ADS)
Pozharskiy, Dmitry
In recent years a nonlinear, acoustic metamaterial, named granular crystals, has gained prominence due to its high accessibility, both experimentally and computationally. The observation of a wide range of dynamical phenomena in the system, due to its inherent nonlinearities, has suggested its importance in many engineering applications related to wave propagation. In the first part of this dissertation, we explore the nonlinear dynamics of damped-driven granular crystals. In one case, we consider a highly nonlinear setting, also known as a sonic vacuum, and derive a nonlinear analogue of a linear spectrum, corresponding to resonant periodic propagation and antiresonances. Experimental studies confirm the computational findings and the assimilation of experimental data into a numerical model is demonstrated. In the second case, global bifurcations in a precompressed granular crystal are examined, and their involvement in the appearance of chaotic dynamics is demonstrated. Both results highlight the importance of exploring the nonlinear dynamics, to gain insight into how a granular crystal responds to different external excitations. In the second part, we borrow established ideas from coarse-graining of dynamical systems, and extend them to optimization problems. We combine manifold learning algorithms, such as Diffusion Maps, with stochastic optimization methods, such as Simulated Annealing, and show that we can retrieve an ensemble, of few, important parameters that should be explored in detail. This framework can lead to acceleration of convergence when dealing with complex, high-dimensional optimization, and could potentially be applied to design engineered granular crystals.
2013-01-01
The most abundant polyphenol in green tea, epigallocatechin-3-gallate (EGCg), has recently received considerable attention due to the discovery of numerous health-promoting bioactivities. Despite reports of its poor oral bioavailability, EGCg has been included in many dietary supplement formulations. Conventional preformulation methods have been employed to improve the bioavailability of EGCg. However, these methods have limitations that hinder the development of EGCg as an effective therapeutic agent. In this study, we have utilized the basic concepts of crystal engineering and several crystallization techniques to screen for various solid crystalline forms of EGCg and evaluated the efficacy of crystal engineering for modulating the pharmacokinetics of EGCg. We synthesized and characterized seven previously undescribed crystal forms of EGCg including the pure crystal structure of EGCg. The aqueous solubility profiles of four new EGCg cocrystals were determined. These cocrystals were subsequently dosed at 100 mg EGCg per kg body weight in rats, and the plasma levels were monitored over the course of eight hours following the single oral dose. Two of the EGCg cocrystals were found to exhibit modest improvements in relative bioavailability. Further, cocrystallization resulted in marked effects on pharmacokinetic parameters including Cmax, Tmax, area under curve, relative bioavailability, and apparent terminal half-life. Our findings suggest that modulation of the pharmacokinetic profile of EGCg is possible using cocrystallization and that it offers certain opportunities that could be useful during its development as a therapeutic agent. PMID:23730870
17. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING ...
17. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING EAST The direct-acting 1883 Pittston Engine and Machine Company steam engine was made by George A. Parrish and W. B. Culver of West Pittston, Pennsylvania. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
Reddy, Michael M.; Leenheer, Jerry
2011-01-01
Calcite crystallization rates are characterized using a constant solution composition at 25°C, pH=8.5, and calcite supersaturation (Ω) of 4.5 in the absence and presence of fulvic acids isolated from Big Soda Lake, Nevada (BSLFA), and a fulvic acid from the Suwannee River, Georgia (SRFA). Rates are also measured in the presence and absence of low-molar mass, aliphatic-alicyclic polycarboxylic acids (PCA). BSLFA inhibits calcite crystal-growth rates with increasing BSLFA concentration, suggesting that BSLFA adsorbs at growth sites on the calcite crystal surface. Calcite growth morphology in the presence of BSLFA differed from growth in its absence, supporting an adsorption mechanism of calcite-growth inhibition by BSLFA. Calcite growth-rate inhibition by BSLFA is consistent with a model indicating that polycarboxylic acid molecules present in BSLFA adsorb at growth sites on the calcite crystal surface. In contrast to published results for an unfractionated SRFA, there is dramatic calcite growth inhibition (at a concentration of 1 mg/L) by a SRFA fraction eluted by pH 5 solution from XAD-8 resin, indicating that calcite growth-rate inhibition is related to specific SRFA component fractions. A cyclic PCA, 1, 2, 3, 4, 5, 6-cyclohexane hexacarboxylic acid (CHXHCA) is a strong calcite growth-rate inhibitor at concentrations less than 0.1 mg/L. Two other cyclic PCAs, 1, 1 cyclopentanedicarboxylic acid (CPDCA) and 1, 1 cyclobutanedicarboxylic acid (CBDCA) with the carboxylic acid groups attached to the same ring carbon atom, have no effect on calcite growth rates up to concentrations of 10 mg/L. Organic matter ad-sorbed from the air onto the seed crystals has no effect on the measured calcite crystal-growth rates.
NASA Astrophysics Data System (ADS)
Shkuratov, Sergey I.; Baird, Jason; Antipov, Vladimir G.; Hackenberger, Wesley; Luo, Jun; Zhang, Shujun; Lynch, Christopher S.; Chase, Jay B.; Jo, Hwan R.; Roberts, Christopher C.
2018-03-01
The development of relaxor ferroelectric single crystal technology is driven by the ability to tailor ferroelectric properties through domain engineering not achievable in polycrystalline materials. In this study, three types of domain-engineered rhombohedral Pb(In1/2Nb1/2)O3-Pb(Mg1/3Nb2/3)O3-PbTiO3 crystals were subjected to transverse high strain rate loading. The experimental results indicate that the domain configuration has a significant effect on the stress-induced depolarization and the associated charge released. A complete depolarization of the single-domain crystals with 3m symmetry is observed, while multidomain crystals with 4mm and mm2 symmetries retain a fraction of their initial remanent polarization. The complete depolarization of single-domain crystals is unique without transition to a non-polar phase, with a stress-induced charge density of 0.48 C/m2. This is up to three times higher than that of the multidomain crystals and PbZrxTi1-xO3 ferroelectric ceramics that are critical for ultrahigh-power transducer applications. The main offering of this work is to propose a detailed mechanism for complete stress-induced depolarization in ferroelectric crystals which does not involve an intermediate transformation to a non-polar phase.
NASA Technical Reports Server (NTRS)
Veres, Joseph P.; Jorgenson, Philip C. E.; Jones, Scott M.
2016-01-01
The Propulsion Systems Laboratory (PSL), an altitude test facility at NASA Glenn Research Center, has been used to test a highly instrumented turbine engine at simulated altitude operating conditions. This is a continuation of the PSL testing that successfully duplicated the icing events that were experienced in a previous engine (serial LF01) during flight through ice crystal clouds, which was the first turbofan engine tested in PSL. This second model of the ALF502R-5A serial number LF11 is a highly instrumented version of the previous engine. The PSL facility provides a continuous cloud of ice crystals with controlled characteristics of size and concentration, which are ingested by the engine during operation at simulated altitudes. Several of the previous operating points tested in the LF01 engine were duplicated to confirm repeatability in LF11. The instrumentation included video cameras to visually illustrate the accretion of ice in the low pressure compressor (LPC) exit guide vane region in order to confirm the ice accretion, which was suspected during the testing of the LF01. Traditional instrumentation included static pressure taps in the low pressure compressor inner and outer flow path walls, as well as total pressure and temperature rakes in the low pressure compressor region. The test data was utilized to determine the losses and blockages due to accretion in the exit guide vane region of the LPC. Multiple data points were analyzed with the Honeywell Customer Deck. A full engine roll back point was modeled with the Numerical Propulsion System Simulation (NPSS) code. The mean line compressor flow analysis code with ice crystal modeling was utilized to estimate the parameters that indicate the risk of accretion, as well as to estimate the degree of blockage and losses caused by accretion during a full engine roll back point. The analysis provided additional validation of the icing risk parameters within the LPC, as well as the creation of models for estimating the rates of blockage growth and losses.
NASA Technical Reports Server (NTRS)
Chirivella, J. E.
1975-01-01
Instrumentation for the measurement of plume exhaust specie deposition rates were developed and demonstrated. The instruments, two sets of quartz crystal microbalances, were designed for low temperature operation in the back flow and variable temperature operation in the core flow regions of an exhaust plume. These quartz crystal microbalances performed nominally, and measurements of exhaust specie deposition rates for 8400 number of pulses for a 0.1-lb monopropellant thruster are reported.
Amorphous or Crystalline? A Comparison of Particle Engineering Methods and Selection.
Thakkar, Sachin G; Fathe, Kristin; Smyth, Hugh D C
2015-01-01
This review is intended to provide a critical account of the current goals and technologies of particle engineering regarding the production of crystalline and amorphous particles. The technologies discussed here cover traditional crystallization technologies, supercritical fluid technologies, spray drying, controlled solvent crystallization, and sonocrystallization. Also recent advancements in particle engineering including spray freezing into liquid, thin-film freeze-drying, PRINT technology are presented. The paper also examines the merits and limitations of these technologies with respect to their methods of characterization. Additionally a section discussing the utility of creating amorphous and crystalline formulation approaches in regards to bioavailability and utility in formulation is presented.
Functional Topology of Evolving Urban Drainage Networks
NASA Astrophysics Data System (ADS)
Yang, Soohyun; Paik, Kyungrock; McGrath, Gavan S.; Urich, Christian; Krueger, Elisabeth; Kumar, Praveen; Rao, P. Suresh C.
2017-11-01
We investigated the scaling and topology of engineered urban drainage networks (UDNs) in two cities, and further examined UDN evolution over decades. UDN scaling was analyzed using two power law scaling characteristics widely employed for river networks: (1) Hack's law of length (L)-area (A) [L∝Ah] and (2) exceedance probability distribution of upstream contributing area (δ) [P>(A≥δ>)˜aδ-ɛ]. For the smallest UDNs (<2 km2), length-area scales linearly (h ˜ 1), but power law scaling (h ˜ 0.6) emerges as the UDNs grow. While P>(A≥δ>) plots for river networks are abruptly truncated, those for UDNs display exponential tempering [P>(A≥δ>)=aδ-ɛexp>(-cδ>)]. The tempering parameter c decreases as the UDNs grow, implying that the distribution evolves in time to resemble those for river networks. However, the power law exponent ɛ for large UDNs tends to be greater than the range reported for river networks. Differences in generative processes and engineering design constraints contribute to observed differences in the evolution of UDNs and river networks, including subnet heterogeneity and nonrandom branching.
An appraisal of the ground-water resources of the Juniata River Basin, Pennsylvania
Seaber, Paul R.; Hollyday, Este F.
1966-01-01
This report describes the availability, quantity, quality, variability, and cost of development of the ground-water resources in the Juniata River basin, one of the larger sub-basins of the Susquehanna River basin. The report has been prepared for and under specifications established by the Corps of Engineers, U. S. Army, and the Public Health Service, Department of Health, Education, and Welfare.A comprehensive study of the water and related land resources of the Susquehanna River basin was authorized by the Congress of the United States in October 1961, and the task of preparing a report and of coordinating the work being done by others in support of the study was assigned to the Corps of Engineers. The comprehensive study is being conducted by several Federal departments and independent agencies in cooperation with the States of New York, Pennsylvania, and Maryland. The Public Health Service under its authority in the Federal Water Pollution Control Act (P. L. 660) initiated a comprehensive water quality control program for the Chesapeake drainage basin, which includes the Susquehanna River basin.
19. Stress sheet for the river span dated 7/13/12; revised ...
19. Stress sheet for the river span dated 7/13/12; revised Oct. 18 and 21, 1912. Drawing courtesy Office of the Cuyahoga County Engineer, Cleveland, Ohio. - Detroit Superior High Level Bridge, Cleveland, Cuyahoga County, OH
10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...
10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, Monica
Monica Phillips discuss her role as an engineer at Savannah River National Laboratory. Her mission is to provide support to various customers on-site through engineered equipment and solutions, along with solving complex problems to help them meet their needs.
39. ENGINE LATHE, SANDER, AND LATHE WITH PATTERNS AND SHAFTS ...
39. ENGINE LATHE, SANDER, AND LATHE WITH PATTERNS AND SHAFTS ABOVE-LOOKING NORTHWEST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
77 FR 20331 - Department of the Army, Corps of Engineers
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... and Indian Field Creek along the York River in Yorktown, VA; Restricted Area AGENCY: U.S. Army Corps... comments. SUMMARY: The Corps of Engineers is proposing to amend an existing permanent restricted area in... Weapons Station Yorktown is requesting the Corps of Engineers modify the existing restricted area to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... District Engineer and market by signs and/or flashing red lights installed in conspicuous and appropriate... structures located on the left-hand side (facing downstream) of the river and a black can-type buoy for such... buoy of appropriate type and color (red nun or black can buoy) until covered by a depth of water equal...
Code of Federal Regulations, 2013 CFR
2013-07-01
... District Engineer and market by signs and/or flashing red lights installed in conspicuous and appropriate... structures located on the left-hand side (facing downstream) of the river and a black can-type buoy for such... buoy of appropriate type and color (red nun or black can buoy) until covered by a depth of water equal...
15. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
15. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1917, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of locks in 1990's - St. Mary's Falls Canal, Soo Locks, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
ERIC Educational Resources Information Center
Nienkamp, Paul
2010-01-01
During the twentieth-century, American engineers harnessed the atom, sent men to the moon, and literally reshaped the world. They re-routed rivers to create giant hydroelectric dams, created a massive and interconnected highway system, and designed skyscrapers, jets, computers, and the internet. As a modern profession, engineering boasted strong…
Annual Technical Report, Materials Research Laboratory, 1 July 1981-30 June 1982.
1982-06-30
of making source regions is best for our purposes. Principal Investizator: P.J. Stiles (Physics). Personnel: E . Crisman (Engineering) and J-I Lee...of Dislocation Substructure in Aluminum Single Crystals Following Dynamic Deformation," C.Y. Chiem and J. Duffy, MEA 79-23742/3, MRL E -137, October...Engineering), Y. Zuiki (Engineering), A. Azar (Engineering), E . Lavernia (Engineering), P. Rosakis (Engineering). Publications: "Experimental Determination of
NASA Images Mississippi River Flooding in Louisiana
2011-05-19
NASA Terra spacecraft shows the water flow after the U.S. Army Corps of Engineers opened the Morganza Spillway, a flood control structure along the western bank of the Mississippi River in Louisiana, to ease flooding along levee systems on May 14, 2011.
ASTER Images Flooding from Mississippi River Levee Breach
2011-05-10
NASA Terra spacecraft shows the resultant flooding of farmland west of the Mississippi 20 miles south of the Mississippi River levee breach. U.S. Army Corps of Engineers detonated explosives at the Birds Point levee near Wyatt, Missouri, on May 2, 2011.
User's manual for BRI-STARS (BRIdge Stream Tube model for Alluvial River Simulation)
DOT National Transportation Integrated Search
1998-07-01
There is a need for a generalized water and sediment-routing computer model for solving complicated river engineering problems with limited data and resources. This program should have the following capabilities: to compute hydraulic parameters for o...
Modeling Trihalomethane Formation Potential from Wastewater Chlorination
1994-09-01
Aerated Lagoon Chlor/Dechlor - - - King Salmon River Luke, AZ Tertiary Ultraviolet 1.2 MGD Agua Fria River / Irrigation MacDD, FL Activated Sludge...November 1988). Tchobanoglous, George and Burton, Franklin L. Wastewater engineering: treatment, disposal, and reuse / Metcalf & Eddy, Inc. -3rd ed
Man versus Rivers: the lost equilibrium of the Tisza River due to engineering works
NASA Astrophysics Data System (ADS)
Kiss, Timea; Fiala, Károly
2016-04-01
The direct and indirect human impacts alter the catchment and the channel characteristics, which will result in further hydro-morphological alterations of rivers. The modified fluvial environment will create new hydrological hazards for the society, so for the successful and sustainable hazard and risk management it is important to evaluate the equilibrium and sensitivity of rivers. The aim of the paper is to evaluate the hydrological and morphological effects of engineering works along the Tisza River, Hungary. Based on the trends of the different fluvial processes the equilibrium of the river will be evaluated to ground further engineering works. The Tisza River, was one of the first systematically regulated rivers in Europe. In the late 19th century artificial cut-offs were made, shortening the river by ca. 30%. The hydrology and the morphology of the Tisza adapted to this, as the channel became temporarily wider and deeper (by 20-25%). The cut-offs had an effect on the channel for ca. 60-70 years. Simultaneously, artificial levees were built, thus the overbank floodplain aggradation became more intensive (from 0.02-0.07 cm/y to 0.3-0.8 mm/y). The floodplain aggradation became higher by 2-4 times since 1970's, as the vegetation became denser. However, in the 21st c. the floodplain vegetation became so uncontrollably dense, that the pattern and rate of accumulation changed again, and now it is limited just to the banks. So the levee could be considered as continuous disturbing factor, besides, the unmanaged floodplain vegetation appeared as a new disturbing force accelerating the processes. In the 20th century revetments were constructed to stop the lateral migration of the channel. This resulted in channel distortion, as it became sharper and the cross-sectional area decreased by 28%. As revetments were constructed along ca. 51% of the channel, the meandering channel forms became replaced features characteristic in incising rivers, for example point-bars disappeared and mass movements became common, especially in the 21st c. As the channel becomes too narrow and confined, the landslides erode the revetments too, thus a natural channel-widening will took place. Thus, the Tisza aligned to the new hydro-morphology after the artificial cut-offs within few decades, and within the given energy and slope conditions the river reached an equilibrium state. However in the 21st c. there are several evidences on the non-equilibrium state: the height and frequency of floods increase, their discharge decreases; the slope of the river declines; and the specific stream power increases. Morphological sign of the lost equilibrium is the vertical and horizontal distortion of the channel (caused by revetments!) and the decreasing flood conductivity of the floodplain (caused by dense, unmanaged floodplain vegetation). The rate of these processes refers to accelerating equilibrium loss. Thus the state of the Tisza could be referred as "non-equilibrium" or "pseudo-equilibrium". Therefore, if further engineering works will be planned, it must be considered that the river might give unexpected hydro-morphological responses on any disturbance.
Granular crystals: Nonlinear dynamics meets materials engineering
Porter, Mason A.; Kevrekidis, Panayotis G.; Daraio, Chiara
2015-11-01
In this article, the freedom to choose the size, stiffness, and spatial distribution of macroscopic particles in a lattice makes granular crystals easily tailored building blocks for shock-absorbing materials, sound-focusing devices, acoustic switches, and other exotica.
Kotov works with Plasma Crystal-3+ Experiment in the SM during Expedition 22
2010-01-25
ISS022-E-035436 (25 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, works with the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kotov works with Plasma Crystal-3+ Experiment in the SM during Expedition 22
2010-01-25
ISS022-E-035434 (25 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, works with the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
An appraisal of the ground-water resources of the lower Susquehanna River basin (An interim report)
Seaber, Paul R.; Hollyday, Este F.
1965-01-01
This report describes the availability, quantity, quality, variability, and cost of development of the ground-water resources in the lower Susquehanna River basin. The report has been prepared for and under specifications established by the Corps of Engineers, U. S. Army, and the Public Health Service, Department of Health, Education, and Welfare.A comprehensive study of the water and related land resources of the Susquehanna River basin was authorized by the Congress of the United States in October 1961, and the task of preparing a report and of coordinating the work being done by others in support of the study was assigned to the Corps of Engineers. The comprehensive study is being conducted by several Federal departments and independent agencies in cooperation with the States of New York, Pennsylvania, and Maryland. The Public Health Service under its authority in the Federal Water Pollution Control Act (P. L. 660) initiated a comprehensive water quality control program for the Chesapeake drainage basin, which includes the Susquehanna River basin.This report is intended to serve the specific needs for ground-water information of both the Corps of Engineers and the Public Health Service, as well as those of the other participating Federal and State agencies.
18. VIEW TOWARD MAIN ENTRANCE OF AMERICAN TOOL ENGINE LATHE, ...
18. VIEW TOWARD MAIN ENTRANCE OF AMERICAN TOOL ENGINE LATHE, JIB CRANE ABOVE-LOOKING NORTH. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
17. TRACTOR ENGINE POWERING SHAFT SYSTEM IN FOREGROUND, BELT CONNECTS ...
17. TRACTOR ENGINE POWERING SHAFT SYSTEM IN FOREGROUND, BELT CONNECTS WITH MAIN SHAFT LOOKING EAST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
13. RADIAL DRILL, ENGINE LATHE, DRILL PRESS, AND GRINDER (L ...
13. RADIAL DRILL, ENGINE LATHE, DRILL PRESS, AND GRINDER (L TO R)-LOOKING SOUTHEAST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
NASA Astrophysics Data System (ADS)
Ospennikova, O. G.; Orlov, M. R.; Kolodochkina, V. G.; Nazarkin, R. M.
2015-04-01
The irreversible structural changes of the single-crystal ZhS32-VI nickel superalloy blades of a high-pressure turbine that occur during life tests of a gas turbine engine are studied. The main operation damages in the hottest section of the blade airfoil are found to be the fracture of the heat-resistant coating in the leading edge and the formation of thermomechanical fatigue cracks. The possibility of reconditioning repair of the blades is considered.
Engineering topological edge states in two dimensional magnetic photonic crystal
NASA Astrophysics Data System (ADS)
Yang, Bing; Wu, Tong; Zhang, Xiangdong
2017-01-01
Based on a perturbative approach, we propose a simple and efficient method to engineer the topological edge states in two dimensional magnetic photonic crystals. The topological edge states in the microstructures can be constructed and varied by altering the parameters of the microstructure according to the field-energy distributions of the Bloch states at the related Bloch wave vectors. The validity of the proposed method has been demonstrated by exact numerical calculations through three concrete examples. Our method makes the topological edge states "designable."
Fatigue Failure of Space Shuttle Main Engine Turbine Blades
NASA Technical Reports Server (NTRS)
Swanson, Gregrory R.; Arakere, Nagaraj K.
2000-01-01
Experimental validation of finite element modeling of single crystal turbine blades is presented. Experimental results from uniaxial high cycle fatigue (HCF) test specimens and full scale Space Shuttle Main Engine test firings with the High Pressure Fuel Turbopump Alternate Turbopump (HPFTP/AT) provide the data used for the validation. The conclusions show the significant contribution of the crystal orientation within the blade on the resulting life of the component, that the analysis can predict this variation, and that experimental testing demonstrates it.
Wu, Hui Qiong; Yan, Chang Sheng; Luo, Feng; Krishna, Rajamani
2018-04-02
Different from the established crystal engineering method for enhancing gas-separation performance, we demonstrate herein a distinct approach. In contrast to the pristine MOF (metal-organic framework) material, the C 2 H 2 /CO 2 separation ability for the resultant Ag NPs (nanoparticle)@Fe 2 O 3 @MOF composite material, estimated from breakthrough calculations, is greatly enhanced by 2 times, and further magnified up to 3 times under visible light irradiation.
1990-11-01
cutoff trench be fractured and removed using a non-explosive demolition agent on a IV on 1H slope. No. 40 Required the additional rock excavation of the...Sniabar limestone in Modification 33 be extended downstream through the cutoff trench using the same non-explosive demolition agent . No. 41 Changed the...O45,913 i!~~C ~ &E~J----------- - -- - r - - - - --- USARMY ENGINEER DISTRICT COPPS OF ENGINEERS KIANSAS CITfY MISSOURI 1 LITTLE BLOE RIVERMISSOJRI R G~ 0
Ferris, John G.
1950-01-01
This memorandum summarize information brought out in correspondence between the office of the District Engineer of the Milwaukee District, U.S. Corps of Engineers, and the District Office of the Ground Water Branch of the U.S. Geological Survey at Lansing, Mich., concerning the probable effects on the ground-water resources of the Lansing area from the construction of a proposed flood-water cut-off channel for the Grand River to extend from Millett to Delta Mills, in Eaton County, Mich.
Test drilling in the upper Sevier River drainage basin, Garfield and Piute Counties, Utah
Feltis, R.D.; Robinson, G.B. Jr.
1963-01-01
A test-drilling program was conducted by the U.S. Geological Survey in the upper Sevier River drainage basin (fig. 1) in the summer of 1962. The program was part of a ground-water investigation made in cooperation with the Utah State Engineer. The drilling was financed cooperatively through the State Engineer by the U.S. Geological Survey, Garfield, Piute, Sevier, Sanpete, and Millard Counties, and various water users within those counties. Drilling began in May and continued through September 1962, and 21 test holes were drilled.
Bartholomay, R.C.; Knobel, L.L.; Davis, L.C.
1989-01-01
The U.S. Geological Survey 's Idaho National Engineering Laboratory project office, in cooperation with the U.S. Department of Energy, collected 35 samples of surficial sediments from the Big Lost River drainage and vicinity from July 1987 through August 1988 for analysis of grain-size distribution, bulk mineralogy, and clay mineralogy. Samples were collected from 11 sites in the channel and 5 sites in overbank deposits of the Big Lost River, 6 sites in the spreading areas that receive excess flow from the Big Lost River during peak flow conditions, 7 sites in the natural sinks and playas of the Big Lost River, 1 site in the Little Lost River Sink, and 5 sites from other small, isolated closed basins. Eleven samples from the Big Lost River channel deposits had a mean of 1.9 and median of 0.8 weight percent in the less than 0.062 mm fraction. The other 24 samples had a mean of 63.3 and median of 63.7 weight percent for the same size fraction. Mineralogy data are consistent with grain-size data. The Big Lost River channel deposits had mean and median percent mineral abundances of total clays and detrital mica of 10 and 10%, respectively, whereas the remaining 24 samples had mean and median values of 24% and 22.5% , respectively. (USGS)
Tidal-flow, circulation, and flushing characteristics of Kings Bay, Citrus County, Florida
Hammett, K.M.; Goodwin, C.R.; Sanders, G.L.
1996-01-01
Kings Bay is an estuary on the gulf coast of peninsular Florida with a surface area of less than one square mile. It is a unique estuarine system with no significant inflowing rivers or streams. As much as 99 percent of the freshwater entering the bay originates from multiple spring vents at the bottom of the estuary. The circulation and flushing characteristics of Kings Bay were evaluated by applying SIMSYS2D, a two-dimensional numerical model. Field data were used to calibrate and verify the model. Lagrangian particle simulations were used to determine the circulation characteristics for three hydrologic conditions: low inflow, typical inflow, and low inflow with reduced friction from aquatic vegetation. Spring discharge transported the particles from Kings Bay through Crystal River and out of the model domain. Tidal effects added an oscillatory component to the particle paths. The mean particle residence time was 59 hours for low inflow with reduced friction; therefore, particle residence time is affected more by spring discharge than by bottom friction. Circulation patterns were virtually identical for the three simulated hydroloigc conditions. Simulated particles introduced in the southern part of Kings Bay traveled along the eastern side of Buzzard Island before entering Crystal River and existing the model domain. The flushing characteristics of Kings Bay for the three hydrodynamic conditions were determined by simulating the injection of conservative dye constituents. The average concentration of dye initially injected in Kings Bay decreased asymptotically because of spring discharge, and the tide caused some oscillation in the average dye concentration. Ninety-five percent of the injected dye exited Kings Bay and Crystal River with 94 hours for low inflow, 71 hours for typical inflow, and 94 hours for low inflow with reduced bottom friction. Simulation results indicate that all of the open waters of Kings Bay are flushed by the spring discharge. Reduced bottom friction has little effect on flushing.
Schloesser, J.T.; Paukert, Craig P.; Doyle, W.J.; Hill, T.; Steffensen, K.D.; Travnichek, Vincent H.
2012-01-01
Large rivers throughout the world have been modified by using dike structures to divert water flows to deepwater habitats to maintain navigation channels. These modifications have been implicated in the decline in habitat diversity and native fishes. However, dike structures have been modified in the Missouri River USA to increase habitat diversity to aid in the recovery of native fishes. We compared species occupancy and fish community composition at natural sandbars and at notched and un-notched rock dikes along the lower Missouri River to determine if notching dikes increases species diversity or occupancy of native fishes. Fish were collected using gill nets, trammel nets, otter trawls, and mini fyke nets throughout the lower 1212 river km of the Missouri River USA from 2003 to 2006. Few differences in species richness and diversity were evident among engineered dike structures and natural sandbars. Notching a dike structure had no effect on proportional abundance of fluvial dependents, fluvial specialists, and macrohabitat generalists. Occupancy at notched dikes increased for two species but did not differ for 17 other species (81%). Our results suggest that dike structures may provide suitable habitats for fluvial species compared with channel sand bars, but dike notching did not increase abundance or occupancy of most Missouri River fishes. Published in 2011 by John Wiley & Sons, Ltd.
Protein crystal growth in space
NASA Technical Reports Server (NTRS)
Bugg, C. E.; Clifford, D. W.
1987-01-01
The advantages of protein crystallization in space, and the applications of protein crystallography to drug design, protein engineering, and the design of synthetic vaccines are examined. The steps involved in using protein crystallography to determine the three-dimensional structure of a protein are discussed. The growth chamber design and the hand-held apparatus developed for protein crystal growth by vapor diffusion techniques (hanging-drop method) are described; the experimental data from the four Shuttle missions are utilized to develop hardware for protein crystal growth in space and to evaluate the effects of gravity on protein crystal growth.
Upper Mississippi River and Illinois Waterways : non-structural measures cost-benefit study
DOT National Transportation Integrated Search
2003-05-01
These analyses support the U.S. Army Corps of Engineers study of navigation in the Upper Mississippi River (UMR) and Illinois Waterway (IWW) and address the need to examine the potential of non-structural measures to improve efficiency in th...
Complaint, Master Settlement Agreement et al. for John Hubenka and LeClair Irrigation District
In 2000, Mr. Hubenka discharged dredged and/or fill material into the Wind River by constructing a series of dikes in the river without first obtaining a CWA Section 404 permit from the Army Corps of Engineers (“Corps”).
A comparison study of one-and two-dimensional hydraulic models for river environments.
DOT National Transportation Integrated Search
2017-05-01
Computer models are used every day to analyze river systems for a wide variety of reasons vital to : the public interest. For decades most hydraulic engineers have been limited to models that simplify the fluid : mechanics to the unidirectional case....
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE... Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition, responsibilities and authority of the Mississippi River Water Control Management Board. (b) Applicability. This...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
NASA Astrophysics Data System (ADS)
Brown, Rocko A.; Pasternack, Gregory B.
2008-05-01
In efforts to rehabilitate regulated rivers for ecological benefits, the flow regime has been one of the primary focal points of management strategies. However, channel engineering can impact channel geometry such that hydraulic and geomorphic responses to flow reregulation do not yield the sought for benefits. To illustrate and assess the impacts of structural channel controls and flow reregulation on channel processes and fish habitat quality in multiple life stages, a highly detailed digital elevation model was collected and analyzed for a river reach right below a dam using a suite of hydrologic, hydraulic, geomorphic, and ecological methods. Results showed that, despite flow reregulation to produce a scaled-down natural hydrograph, anthropogenic boundary controls have severely altered geomorphic processes associated with geomorphic self-sustainability and instream habitat availability in the case study. Given the similarity of this stream to many others, we concluded that the potential utility of natural flow regime reinstatement in regulated gravel-bed rivers is conditional on concomitant channel rehabilitation.
Chase, Katherine J.
2013-01-01
Major floods in 1996 and 1997 on the Yellowstone River in Montana intensified public debate over the effects of human activities on the Yellowstone River. In 1999, the Yellowstone River Conservation District Council was formed to address conservation issues on the river. The Yellowstone River Conservation District Council partnered with the U.S. Army Corps of Engineers to conduct a cumulative-effects study on the main stem of the Yellowstone River. The cumulative-effects study is intended to provide a basis for future management decisions in the watershed. Streamflow statistics, such as flow-frequency and flow-duration data calculated for unregulated and regulated streamflow conditions, are a necessary component of the cumulative effects study. The U.S. Geological Survey, in cooperation with the Yellowstone River Conservation District Council and the U.S. Army Corps of Engineers, calculated streamflow statistics for unregulated and regulated conditions for the Yellowstone, Tongue, and Powder Rivers for the 1928–2002 study period. Unregulated streamflow represents flow conditions that might have occurred during the 1928–2002 study period if there had been no water-resources development in the Yellowstone River Basin. Regulated streamflow represents estimates of flow conditions during the 1928–2002 study period if the level of water-resources development existing in 2002 was in place during the entire study period. Peak-flow frequency estimates for regulated and unregulated streamflow were developed using methods described in Bulletin 17B. High-flow frequency and low-flow frequency data were developed for regulated and unregulated streamflows from the annual series of highest and lowest (respectively) mean flows for specified n-day consecutive periods within the calendar year. Flow-duration data, and monthly and annual streamflow characteristics, also were calculated for the unregulated and regulated streamflows.
Modeling discharge, temperature, and water quality in the Tualatin River, Oregon
Rounds, Stewart A.; Wood, Tamara M.; Lynch, Dennis D.
1999-01-01
The discharge, water temperature, and water quality of the Tualatin River in northwestern Oregon was simulated with CE-QUAL-W2, a two-dimensional, laterally averaged model developed by the U.S. Army Corps of Engineers. The model was calibrated for May through October periods of 1991, 1992, and 1993. Nine hypothetical scenarios were tested with the model to provide insight for river managers and regulators.
Joint Development of a Fourth Generation Single Crystal Superalloy
NASA Technical Reports Server (NTRS)
Walston, S.; Cetel, A.; MacKay, R.; OHara, K.; Duhl, D.; Dreshfield, R.
2004-01-01
A new, fourth generation, single crystal superalloy has been jointly developed by GE Aircraft Engines, Pratt & Whitney, and NASA. The focus of the effort was to develop a turbine airfoil alloy with long-term durability for use in the High Speed Civil Transport. In order to achieve adequate long-time strength improvements at moderate temperatures and retain good microstructural stability, it was necessary to make significant composition changes from 2nd and 3rd generation single crystal superalloys. These included lower chromium levels, higher cobalt and rhenium levels and the inclusion of a new alloying element, ruthenium. It was found that higher Co levels were beneficial to reducing both TCP precipitation and SRZ formation. Ruthenium caused the refractory elements to partition more strongly to the ' phase, which resulted in better overall alloy stability. The final alloy, EPM 102, had significant creep rupture and fatigue improvements over the baseline production alloys and had acceptable microstructural stability. The alloy is currently being engine tested and evaluated for advanced engine applications.
Ice Accretion Measurements on an Airfoil and Wedge in Mixed-Phase Conditions
NASA Technical Reports Server (NTRS)
Struk, Peter; Bartkus, Tadas; Tsao, Jen-Ching; Currie, Tom; Fuleki, Dan
2015-01-01
This paper describes ice accretion measurements from experiments conducted at the National Research Council (NRC) of Canada's Research Altitude Test Facility during 2012. Due to numerous engine power loss events associated with high altitude convective weather, potential ice accretion within an engine due to ice crystal ingestion is being investigated collaboratively by NASA and NRC. These investigations examine the physical mechanisms of ice accretion on surfaces exposed to ice crystal and mixed phase conditions, similar to those believed to exist in core compressor regions of jet engines. A further objective of these tests is to examine scaling effects since altitude appears to play a key role in this icing process.
Self-Assembly of Reconfigurable By-Design Optical Materials with Molecular-Level Control
2014-09-21
International Conference on Metamaterials, Photonic Crystals and Plasmonics, Singapore, May 20 - 23, 2014. Zhang, W. “Design, Synthesis, and Applications of...metal nanoparticles positioned in 3D crystal lattices...materials such as photonic crystal and metamaterial hold high promise of providing a path to by-design optical materials with engineered optical
Multi Resonance Shear Mode Transducers
2016-11-21
burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing...ABSTRACT Crystallographic engineering of single crystal relaxor-based ferroelectrics was used to design broadband, compact, high power, low frequency...using multiple d36 crystal geometries or combinations of d36 and other crystal cuts. 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17
The Cumberland River Flood of 2010 and Corps Reservoir Operations
NASA Astrophysics Data System (ADS)
Charley, W.; Hanbali, F.; Rohrbach, B.
2010-12-01
On Saturday, May 1, 2010, heavy rain began falling in the Cumberland River Valley and continued through the following day. 13.5 inches was measured at Nashville, an unprecedented amount that doubled the previous 2-day record, and exceeded the May monthly total record of 11 inches. Elsewhere in the valley, amounts of over 19 inches were measured. The frequency of this storm was estimated to exceed the one-thousand year event. This historic rainfall brought large scale flooding to the Cumberland-Ohio-Tennessee River Valleys, and caused over 2 billion dollars in damages, despite the numerous flood control projects in the area, including eight U.S. Army Corps of Engineers projects. The vast majority of rainfall occurred in drainage areas that are uncontrolled by Corps flood control projects, which lead to the wide area flooding. However, preliminary analysis indicates that operations of the Corps projects reduced the Cumberland River flood crest in Nashville by approximately five feet. With funding from the American Recovery and Reinvestment Act (ARRA) of 2009, hydrologic, hydraulic and reservoir simulation models have just been completed for the Cumberland-Ohio-Tennessee River Valleys. These models are being implemented in the Corps Water Management System (CWMS), a comprehensive data acquisition and hydrologic modeling system for short-term decision support of water control operations in real time. The CWMS modeling component uses observed rainfall and forecasted rainfall to compute forecasts of river flows into and downstream of reservoirs, using HEC-HMS. Simulation of reservoir operations, utilizing either the HEC-ResSim or CADSWES RiverWare program, uses these flow scenarios to provide operational decision information for the engineer. The river hydraulics program, HEC-RAS, computes river stages and water surface profiles for these scenarios. An inundation boundary and depth map of water in the flood plain can be calculated from the HEC-RAS results using ArcInfo. The economic impacts of the different inundation depths are computed by HEC-FIA. The user-configurable sequence of modeling software allows engineers to evaluate operational decisions for reservoirs and other control structures, and view and compare hydraulic and economic impacts for various “what if?” scenarios. This paper reviews the Cumberland River May 2010 event, the impact of Corps reservoirs and reservoir operations and the expected future benefits and effects of the ARRA funded models and CWMS on future events for this area.
15. View looking N at foundation ruins of steam engine ...
15. View looking N at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
16. View looking E at foundation ruins of steam engine ...
16. View looking E at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
58. Photographic copy of original construction plan (St. Paul Engineer's ...
58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN
Presentations - Smith, J.R. and others, 2013 | Alaska Division of
Engineering Geology Alaska Tidal Datum Portal Climate and Cryosphere Hazards Coastal Hazards Program Guide to (1.4 M) Keywords Coastal; Coastal and River; Engineering Geology Posters and Presentations; Seward
A model study of bridge hydraulics
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers HEC-RAS (Hydrologic Engineering : Centers River Analysis System) computer program. This study was carried out to compare results of HEC-RAS : bridge modeling with laboratory e...
18. Photocopy of an engineering drawing (original in the Collection ...
18. Photocopy of an engineering drawing (original in the Collection of the Washington State Department of Public Works)--August 1921--LOCATION-TOPOGRAPHY AND GENERAL ELEVATION - Pasco-Kennewick Bridge, Spanning Columbia River, Pasco, Franklin County, WA
Crystal Engineering; How molecules build solids
NASA Astrophysics Data System (ADS)
Williams, Jeffrey H.
2017-09-01
There are more than 20 million chemicals in the literature, with new materials being synthesized each week. Most of these molecules are stable, and the 3-dimensional arrangement of the atoms in the molecules, in the various solids may be determined by routine x-ray crystallography. When this is done, it is found that this vast range of molecules, with varying sizes and shapes can be accommodated by only a handful of solid structures. This limited number of architectures for the packing of molecules of all shapes and sizes, to maximize attractive intermolecular forces and minimizing repulsive intermolecular forces, allows us to develop simple models of what holds the molecules together in the solid. In this volume we look at the origin of the molecular architecture of crystals; a topic that is becoming increasingly important and is often termed, crystal engineering. Such studies are a means of predicting crystal structures, and of designing crystals with particular properties by manipulating the structure and interaction of large molecules. That is, creating new crystal architectures with desired physical characteristics in which the molecules pack together in particular architectures; a subject of particular interest to the pharmaceutical industry.
Fang, Yiping
2013-09-01
The three-rivers headwater region (THRHR) of Qinghai province, China plays a key role as source of fresh water and ecosystem services for central and eastern China. Global warming and human activities in the THRHR have threatened the ecosystem since the 1980s. Therefore, the Chinese government has included managing of the THRHR in the national strategy since 2003. The State Integrated Test and Demonstration Region of the THRHR highlights the connection with social engineering (focus on improving people's livelihood and well-being) in managing nature reserves. Based on this program, this perspective attempts a holistic analysis of the strategic role of the THRHR, requirements for change, indices of change, and approaches to change. Long-term success of managing nature reserves requires effective combination of ecological conservation, economic development, and social progress. Thus, the philosophy of social engineering should be employed as a strategy to manage the THRHR.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... no change to radioactive effluents that affect radiation exposures to plant workers and members of... resources. There would be no impact to socioeconomic resources. Therefore, no changes to or different types...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, K. M.; Edwards, T. B.; Mcclane, D. L.
2016-03-01
In this report, Savannah River National Laboratory provides chemical analyses and Product Consistency Test (PCT) results for a series of simulated high level waste (HLW) glasses fabricated by Pacific Northwest National Laboratory (PNNL) as part of an ongoing nepheline crystallization study. The results of these analyses will be used to improve the ability to predict crystallization of nepheline as a function of composition and heat treatment for glasses formulated at high alumina concentrations.
Langtimm, C.A.; O'Shea, T.J.; Pradel, R.; Beck, C.A.
1998-01-01
The population dynamics of large, long-lived mammals are particularly sensitive to changes in adult survival. Understanding factors affecting survival patterns is therefore critical for developing and testing theories of population dynamics and for developing management strategies aimed at preventing declines or extinction in such taxa. Few studies have used modern analytical approaches for analyzing variation and testing hypotheses about survival probabilities in large mammals. This paper reports a detailed analysis of annual adult survival in the Florida manatee (Trichechus manatus latirostris), an endangered marine mammal, based on a mark-recapture approach. Natural and boat-inflicted scars distinctively 'marked' individual manatees that were cataloged in a computer-based photographic system. Photo-documented resightings provided 'recaptures.' Using open population models, annual adult-survival probabilities were estimated for manatees observed in winter in three areas of Florida: Blue Spring, Crystal River, and the Atlantic coast. After using goodness-of-fit tests in Program RELEASE to search for violations of the assumptions of mark-recapture analysis, survival and sighting probabilities were modeled under several different biological hypotheses with Program SURGE. Estimates of mean annual probability of sighting varied from 0.948 for Blue Spring to 0.737 for Crystal River and 0.507 for the Atlantic coast. At Crystal River and Blue Spring, annual survival probabilities were best estimated as constant over the study period at 0.96 (95% CI = 0.951-0.975 and 0.900-0.985, respectively). On the Atlantic coast, where manatees are impacted more by human activities, annual survival probabilities had a significantly lower mean estimate of 0.91 (95% CI = 0.887-0.926) and varied unpredictably over the study period. For each study area, survival did not differ between sexes and was independent of relative adult age. The high constant adult-survival probabilities estimated for manatees in the Blue Spring and Crystal River areas were consistent with current mammalian life history theory and other empirical data available for large, long-lived mammals. Adult survival probabilities in these areas appeared high enough to maintain growing populations if other traits such as reproductive rates and juvenile survival were also sufficiently high lower and variable survival rates on the Atlantic coast are cause for concern.
1980-01-01
Engineering Branch Engineering Division CARNEY M. TERZIAN, MEMBER Design Branch Engineering Division S, RICHARD DIE O CHIRA Water Control Branch...Associates, P.C. under a letter of 19 October 1979 from William E. Hodgson, Jr., Colonel, Corps of Engineers. Contract No. DACW33-80-C-0001 has been assigned
14. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
14. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1917, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of locks prior to completion of Sabin (fourth) Lock - St. Mary's Falls Canal, Soo Locks, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
16. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
16. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1915, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Filling and emptying culvert butterfly valve and hydraulic piston. - St. Mary's Falls Canal, Soo Locks, Sabin Lock Subcomplex, Sabin Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
9. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
9. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1912, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Filling and emptying culvert butterfly valve and hydraulic piston. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Davis Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
Macrophytes: ecosystem engineers in UK urban rivers
NASA Astrophysics Data System (ADS)
Gibbs, H.; Gurnell, A.; Heppell, K.; Spencer, K.
2012-04-01
Macrophytes act as ecosystem engineers within river channels in that they have the ability to cause geomorphological and ecological change. They induce reductions in flow velocity and associated sediment accumulation, and their system of underground roots and rhizomes also reinforces the accumulated sediment reducing sediment erosion and resuspension and creating habitats. As sediments, particularly finer-grained, store contaminants including metals, this engineering means that in the specific context of urban rivers where sediments are more likely to be contaminated, macrophytes trap and hold contaminated sediments creating a potentially important sink of metals. However, depending on the ability for the macrophyte to reinforce the sediment and reduce erosion and resuspension, there is the potential for the sink to turn in to a source and metals to be released in to the overlying water. This research therefore looks at the ecosystem engineering ability of common macrophytes in UK urban rivers by looking at: (i) the effect upon flow velocity and sediment accumulation of Sparganium erectum (branched bur-reed); (ii) the sediment reinforcement ability of both S. erectum, Typha latifolia (bulrush) and Phalaris arundinacea (reed canary grass); and, (iii) the storage of metals within the sediment, overlying water and the macrophytes. Research was undertaken on the River Blackwater, an urban river in Surrey, UK which has extensive macrophyte growth. Flow velocity measurements and fine sediment depths were recorded both within and outside of dense stands of S. erectum. The uprooting resistance (as an indicator of sediment reinforcement) was measured for three species: S. erectum, T. latifolia and P. arundinacea. Additionally, some preliminary sampling was undertaken of the sediment, overlying water and the macrophytes to determine metal storage. Lower flow velocities and greater volumes of fine sediment were recorded within the stands of S. erectum as opposed to the adjacent areas of open channel with minimal macrophyte growth. Uprooting resistances were considerable and differences were found both between species and over the annual growth cycle. T. latifolia showed the greatest uprooting resistance and P. arundinacea the lowest uprooting resistance. Maximum uprooting resistance for all species was in June. The sampled sediments were found to be a store of metals. For all macrophyte species, the below-ground tissues (roots and rhizomes) generally had greater metal concentrations than above-ground tissues (stem and leafs). The results from this research will help inform the use of macrophytes in the management of sediment-contaminated urban rivers.
A History of the Little Rock District U. S. Army Corps of Engineers
1971-01-01
Orleans on March 23, 1820, and arrived at Arkansas Post on March 31. On the sixty-mile trip from the mouth of the ,. 4 Hydraulic pile-driving on...34 and was to be kept open from the mouth of the river to the mouth of the Grand (Neosho) River, n ear present-day Muskogee, Oklahoma - a total...the river t ended to be narrower ; hence deeper a nd more n avigable. The r emainder of the White River project w a s aban- doned but the existing
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Weapons... except Sundays. (ii) When firing is in progress, no person, or fishing or oystering vessels shall operate...
SLS Engine Section Test Article Loaded on Barge Pegasus at NASA's Michoud Assembly Facility
2017-04-27
A NASA move team loaded the engine section structural qualification test article for the Space Launch System into the barge Pegasus docked in the harbor at NASA's Michoud Assembly Facility in New Orleans. The rocket's engine section is the bottom of the core stage and houses the four RS-25 engines. The engine section test article was moved from Building 103, Michoud’s 43-acre rocket factory, to the barge where it was loaded for a river trip to NASA’s Marshall Space Flight Center in Huntsville, Alabama. The bottom part of the test article is structurally the same as the engine section that will be flown as part of the SLS core stage. The shiny metal top part simulates the rocket's liquid hydrogen tank, which is the fuel tank that joins to the engine section. The barge Pegasus will travel 1,240 miles by river to Marshall and endure tests that pull, push, and bend it, subjecting it to millions of pounds of force. This ensures the structure can withstand the incredible stresses produced by the 8.8 million pounds of thrust during launch and ascent.
Growth and characterization of pure and Cadmium chloride doped KDP Crystals grown by gel medium
NASA Astrophysics Data System (ADS)
Kalaivani, M. S.; Asaithambi, T.
2016-10-01
Crystal growth technology provides an important basis for many industrial branches. Crystals are the unrecognized pillars of modern technology. Without crystals, there is no electronic industry, no photonic industry, and no fiber optic communications. Single crystals play a major role and form the strongest base for the fast growing field of engineering, science and technology. Crystal growth is an interdisciplinary subject covering physics, chemistry, material science, chemical engineering, metallurgy, crystallography, mineralogy, etc. In past few decades, there has been a keen interest on crystal growth processes, particularly in view of the increasing demand of materials for technological applications. Optically good quality pure and metal doped KDP crystals have been grown by gel method at room temperature and their characterization have been studied. Gel method is a much uncomplicated method and can be utilized to synthesize crystals which are having low solubility. Potassium dihydrogen orthophosphate KH2PO4 (KDP) continues to be an interesting material both academically and industrially. KDP is a representative of hydrogen bonded materials which possess very good electro - optic and nonlinear optical properties in addition to interesting electrical properties. Due to this interesting properties, we made an attempt to grow pure and cadmium chloride doped KDP crystals in various concentrations (0.002, 0.004, 0.006, 0.008 and 0.010) using gel method. The grown crystals were collected after 20 days. We get crystals with good quality and shaped. The dc electrical conductivity (resistance, capacitance and dielectric constant) values were measured at frequencies in the range of 1 KHZ and 100 HZ of pure and cadmium chloride added crystal with a temperature range of 400C to 1300C using simple two probe setup with Q band digital LCR meter present in our lab. The electrical conductivity increases with increase of temperature. The dielectric constants of metal doped KDP crystals were slightly decreased compared to pure KDP crystals.
Kotov works with Plasma Crystal-3+ Experiment in the SM during Expedition 22
2010-01-28
ISS022-E-040614 (28 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, is pictured while working with the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kotov works with Plasma Crystal-3 Experiment in the SM during Expedition 22
2010-01-25
ISS022-E-035439 (25 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, is pictured while working with the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kotov works with Plasma Crystal-3 Experiment in the SM during Expedition 22
2010-01-25
ISS022-E-035438 (25 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, uses a computer while servicing the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kotov works with Plasma Crystal-3+ Experiment in the SM during Expedition 22
2010-01-28
ISS022-E-040617 (28 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, is pictured while working with the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kotov works with Plasma Crystal-3+ Experiment in the SM during Expedition 22
2010-01-28
ISS022-E-040615 (28 Jan. 2010) --- Russian cosmonaut Oleg Kotov, Expedition 22 flight engineer, uses a computer while servicing the Plasma Crystal-3 experiment in the Zvezda Service Module of the International Space Station.
Kugel, Alex; He, Jie; Samanta, Satyabrata; ...
2012-08-27
Here, a series of poly(1,9-nonamethylene adipamide-co-1,9-nonamethylene terephthalamide) copolymers were produced using melt polymerization and the thermal properties, crystal structure, and moisture uptake characterized. The results confirmed that the copolymers exhibit isomorphism. As expected, glass transition temperature and the apparent melting temperature increased with increasing terephthalmide content. Using the difference in the apparent melting temperature to the crystallization temperature as a measure of relative crystallization rate, it was observed that crystallization rate decreased as the terephthalamide content of the copolymer was increased from 0 to 50 mole percent but then sharply increased when increased beyond 50 mole percent. This behavior maymore » be the result of extensive inter- and intramolecular interactions in the melt associated with terephthalmide units in the polymer chain that nucleate crystallization upon cooling below the equilibrium melting temperature. Comparing the thermal properties of copolymers possessing an excess of terephthalmide units to the commodity polyamide Nylon 6,6, it is believed that these copolymers may have utility as partially renewable engineering thermoplastics.« less
Crystallization engineering as a route to epitaxial strain control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Akbashev, Andrew R.; Plokhikh, Aleksandr V.; Barbash, Dmitri
2015-10-01
The controlled synthesis of epitaxial thin films offers opportunities for tuning their functional properties via enabling or suppressing strain relaxation. Examining differences in the epitaxial crystallization of amorphous oxide films, we report on an alternate, low-temperature route for strain engineering. Thin films of amorphous Bi–Fe–O were grown on (001)SrTiO{sub 3} and (001)LaAlO{sub 3} substrates via atomic layer deposition. In situ X-ray diffraction and X-ray photoelectron spectroscopy studies of the crystallization of the amorphous films into the epitaxial (001)BiFeO{sub 3} phase reveal distinct evolution profiles of crystallinity with temperature. While growth on (001)SrTiO{sub 3} results in a coherently strained film, themore » same films obtained on (001)LaAlO{sub 3} showed an unstrained, dislocation-rich interface, with an even lower temperature onset of the perovskite phase crystallization than in the case of (001)SrTiO{sub 3}. Our results demonstrate how the strain control in an epitaxial film can be accomplished via its crystallization from the amorphous state.« less
A model study of bridge hydraulics : technical summary.
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers Hydrologic Engineering Centers River Analysis System (HEC-RAS) computer program. This report is the second edition. The first edition of the report considered the laboratory m...
13. Building 105, Facilities Engineering Building, 1830, interior, tin metal ...
13. Building 105, Facilities Engineering Building, 1830, interior, tin metal shop area, showing construction of window and part of ceiling, E wall of building. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... hazards associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations... Michigan has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations...
Model based estimation of sediment erosion in groyne fields along the River Elbe
NASA Astrophysics Data System (ADS)
Prohaska, Sandra; Jancke, Thomas; Westrich, Bernhard
2008-11-01
River water quality is still a vital environmental issue, even though ongoing emissions of contaminants are being reduced in several European rivers. The mobility of historically contaminated deposits is key issue in sediment management strategy and remediation planning. Resuspension of contaminated sediments impacts the water quality and thus, it is important for river engineering and ecological rehabilitation. The erodibility of the sediments and associated contaminants is difficult to predict due to complex time depended physical, chemical, and biological processes, as well as due to the lack of information. Therefore, in engineering practice the values for erosion parameters are usually assumed to be constant despite their high spatial and temporal variability, which leads to a large uncertainty of the erosion parameters. The goal of presented study is to compare the deterministic approach assuming constant critical erosion shear stress and an innovative approach which takes the critical erosion shear stress as a random variable. Furthermore, quantification of the effective value of the critical erosion shear stress, its applicability in numerical models, and erosion probability will be estimated. The results presented here are based on field measurements and numerical modelling of the River Elbe groyne fields.
UAV based hydromorphological mapping of a river reach to improve hydrodynamic numerical models
NASA Astrophysics Data System (ADS)
Lükő, Gabriella; Baranya, Sándor; Rüther, Nils
2017-04-01
Unmanned Aerial Vehicles (UAVs) are increasingly used in the field of engineering surveys. In river engineering, or in general, water resources engineering, UAV based measurements have a huge potential. For instance, indirect measurements of the flow discharge using e.g. large-scale particle image velocimetry (LSPIV), particle tracking velocimetry (PTV), space-time image velocimetry (STIV) or radars became a real alternative for direct flow measurements. Besides flow detection, topographic surveys are also essential for river flow studies as the channel and floodplain geometry is the primary steering feature of the flow. UAVs can play an important role in this field, too. The widely used laser based topographic survey method (LIDAR) can be deployed on UAVs, moreover, the application of the Structure from Motion (SfM) method, which is based on images taken by UAVs, might be an even more cost-efficient alternative to reveal the geometry of distinct objects in the river or on the floodplain. The goal of this study is to demonstrate the utilization of photogrammetry and videogrammetry from airborne footage to provide geometry and flow data for a hydrodynamic numerical simulation of a 2 km long river reach in Albania. First, the geometry of the river is revealed from photogrammetry using the SfM method. Second, a more detailed view of the channel bed at low water level is taken. Using the fine resolution images, a Matlab based code, BASEGrain, developed by the ETH in Zürich, will be applied to determine the grain size characteristics of the river bed. This information will be essential to define the hydraulic roughness in the numerical model. Third, flow mapping is performed using UAV measurements and LSPIV method to quantitatively asses the flow field at the free surface and to estimate the discharge in the river. All data collection and analysis will be carried out using a simple, low-cost UAV, moreover, for all the data processing, open source, freely available software will be used leading to a cost-efficient methodology. The results of the UAV based measurements will be discussed and future research ideas will be outlined.
NASA Astrophysics Data System (ADS)
Hortobágyi, Borbála; Corenblit, Dov; Steiger, Johannes; Peiry, Jean-Luc
2018-03-01
Within riparian corridors, biotic-abiotic feedback mechanisms occur between woody vegetation strongly influenced by hydrogeomorphic constraints (e.g., sediment transport and deposition, shear stress, hydrological variability), fluvial landforms, and morphodynamics, which in turn are modulated by the established vegetation. During field investigations in spring 2015, we studied 16 alluvial bars (e.g., point and lateral bars) within the dynamic riparian corridor of the Allier River (France) to assess the aptitude of three pioneer riparian Salicaceae species (Populus nigra L., Salix purpurea L., and Salix alba L.) to establish and act as ecosystem engineers by trapping sediment and constructing fluvial landforms. Our aim is to empirically identify the preferential establishment area (EA; i.e., the local areas where species become established) and the preferential biogeomorphic feedback window (BFW; i.e., where and to what extent the species and geomorphology interact) of these three species on alluvial bars within a 20-km-long river reach. Our results show that the EA and BFW of all three species vary significantly along the longitudinal profile, i.e., upstream-downstream exposure on the alluvial bars, as well as transversally, i.e., the main hydrological connectivity gradient from the river channel toward the floodplain. In the present-day context of the Allier River, P. nigra is the most abundant species, appearing to act as the main engineer species affecting landform dynamics at the bar scale; S. purpurea is established and acts as an ecosystem engineer at locations on alluvial bars that are most exposed to hydrosedimentary flow dynamics, while S. alba is established on the bar tail close to secondary channels and affects the geomorphology in mixed patches along with P. nigra. Our study highlights the role of functional trait diversity of riparian engineer species in controlling the extent of fluvial landform construction along geomorphic gradients within riparian corridors exposed to frequent hydrogeomorphic disturbances.
USSR and Eastern Europe Scientific Abstracts. Engineering and Equipment. Number 26
1976-11-10
harbor in- volves a sea sector and a river sector. The author indicates the hypotheses taken into consideration, including the number of berths in the...river and sea sectors, the arrivals of sea - and river-going ships, and ship operation time. Also indicated is the system of equations describing...diffusion for plastic deformation by torsion is greater than plastic deformation by tension. The main energy diffusion mechanism is microplastic
Missouri River Recovery Management Plan and Environmental Impact Statement
2014-04-11
Proficient in hydrologic and hydraulic engineering computer models, particularly ResSim and HEC - RAS ; working experience with large river systems including...to help study teams determine ecosystem responses to changes in the flow regime of a river or connected wetland. HEC -EFM analyses involve: 1...Description of the Model and How It Will Be Applied in the Study Approval Status HEC - RAS The function of this model is to conduct one-dimensional hydraulic
Engineering the Kentucky River: The Commonwealth’s Waterway
1999-01-01
durable dugout canoes hollowed from the trunks of trees.6 After felling a tree, usually a poplar, sycamore, or pine , and stripping it of branches and...Skiles and Warren County interests to improve Green and Barren river navigation up to Bowling Green. Metcalfe be- came the first state official to...engi- neers employed to plan slackwater navigation on the Green and Barren rivers which would provide year-round navigation to Bowling Green. This was
Facility siting as a decision process at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wike, L.D.
1995-12-31
Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating amore » facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts.« less
Life Prediction of Turbine Blade Nickel Base Superalloy Single Crystals.
1986-08-01
mechanical properties between single crystals and the DS version of Mar-M200. Soon it was recognized again through the mechanical property - structure ... property achievements demonstrated by screening and simulated engine tests. 1 Single crystals are the results of extensive investigation on the mechanical ...behavior, (especially fatigue and creep) of, and the structure - property correlations in the equiaxed and directionally solidified (DS) nickel-base
Guidelines for Software Engineering Education Version 1.0
1999-11-01
Turbo Pascal and Software Design. Sudbury, Massachusetts: Jones and Bartlett, 1997. " Deitel, Harvey M. & Deitel, Paul J. C++: How to Program . Upper...Saddle River, New Jersey: Prentice-Hall, 1997. " Deitel, Harvey M. & Deitel, Paul J. Java: How to Program . Upper Saddle River, New Jersey: Prentice-Hall
Publications - STATEMAP Project | Alaska Division of Geological &
., 2008, Surficial-geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska , Engineering - geologic map, Alaska Highway corridor, Delta Junction to Dot Lake, Alaska: Alaska Division of geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska Division of Geological
18. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
18. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
16. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
16. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
17. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
17. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
8. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
8. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1911, by U.S. Army Corps of Engineers. Drawings in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of hydraulic accumulator, exhaust reservoir, and pressure pumps. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Southwest Operating Shelter, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
10. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
10. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1912, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Hydraulic accumulator and pressure pumping plant for east end of Davis Lock. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Davis Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gao, Wen-Yang; Chen, Yao; Niu, Youhong
Crystal engineering of the nbo metal–organic framework (MOF) platform MOF-505 with a custom-designed azamacrocycle ligand (1,4,7,10-tetrazazcyclododecane-N,N',N'',N'''-tetra-p-methylbenzoic acid) leads to a high density of well-oriented Lewis active sites within the cuboctahedral cage in MMCF-2, [Cu₂(Cu-tactmb)(H₂O)₃(NO₃)₂]. This MOF demonstrates high catalytic activity for the chemical fixation of CO₂ into cyclic carbonates at room temperature under 1 atm pressure.
2016-07-11
NASA Glenn’s Propulsion Systems Lab (PSL) is conducting research to characterize ice crystal clouds that can create a hazard to aircraft engines under certain conditions. The isokinetic probe (in gold) samples particles and another series of probes can measure everything from humidity to air pressure.
Spectroscopy of Charge Carriers and Traps in Field-Doped Single Crystal Organic Semiconductors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhu, Xiaoyang; Frisbie, Daniel
2017-03-31
The proposed research aims to achieve quantitative, molecular level understanding of charge carriers and traps in field-doped crystalline organic semiconductors via in situ linear and nonlinear optical spectroscopy, in conjunction with transport measurements and molecular/crystal engineering.
NASA Astrophysics Data System (ADS)
Kalyanapu, A. J.; Dullo, T. T.; Thornton, J. C.; Auld, L. A.
2015-12-01
Obion River, is located in the northwestern Tennessee region, and discharges into the Mississippi River. In the past, the river system was largely channelized for agricultural purposes that resulted in increased erosion, loss of wildlife habitat and downstream flood risks. These impacts are now being slowly reversed mainly due to wetland restoration. The river system is characterized by a large network of "loops" around the main channels that hold water either from excess flows or due to flow diversions. Without data on each individual channel, levee, canal, or pond it is not known where the water flows from or to. In some segments along the river, the natural channel has been altered and rerouted by the farmers for their irrigation purposes. Satellite imagery can aid in identifying these features, but its spatial coverage is temporally sparse. All the alterations that have been done to the watershed make it difficult to develop hydraulic models, which could predict flooding and droughts. This is especially true when building one-dimensional (1D) hydraulic models compared to two-dimensional (2D) models, as the former cannot adequately simulate lateral flows in the floodplain and in complex terrains. The objective of this study therefore is to study the performance of 1D and 2D flood models in this complex river system, evaluate the limitations of 1D models and highlight the advantages of 2D models. The study presents the application of HEC-RAS and HEC-2D models developed by the Hydrologic Engineering Center (HEC), a division of the US Army Corps of Engineers. The broader impacts of this study is the development of best practices for developing flood models in channelized river systems and in agricultural watersheds.
Evaluating Investment in Missouri River Restoration: The Missouri River Effects Analysis
NASA Astrophysics Data System (ADS)
Jacobson, R. B.; Fischenich, C. J.; Buenau, K. E.
2014-12-01
In excess of $700 million has been spent over the last 10 years on restoration of the Missouri River. During this time, restoration efforts have focused progressively on avoidance of jeopardy for three threatened or endangered species: interior least tern (Sternula antillarum), piping plover (Charadrius melodus), and the pallid sturgeon (Scaphirhynchus albus). In 2013, the US Army Corps of Engineers, the US Fish and Wildlife Service, and Missouri River stakeholders (through the Missouri River Recovery Implementation Committee) commissioned an Effects Analysis (EA; Murphy and Weiland, 2011) to evaluate the effects of this effort on the three species' populations and to project effects of future restoration. The EA includes synthesis of existing abiotic and biotic scientific information relating to species population processes, distributions, and habitat needs, as well as development of conceptual and quantitative models linking river context to its management and to species' responses. The EA also includes design of the next generation of hypothesis-driven science to support adaptive management of the species and the river. The Missouri River EA faces the challenge of evaluating how management of North America's largest reservoir storage system, 600 km of non-channelized mainstem, and nearly 1,200 km of channelized mainstem contribute to species' population dynamics. To support EA needs, the US Army Corps of Engineers is developing a new generation of reservoir simulation and routing models for the Missouri River basin, coupled with components to evaluate ecological and socio-economic metrics. The EA teams are developing coordinated models relating management to functional habitats and species' responses. A particular challenge faced by the EA is communicating the very different uncertainties in population dynamics between well-documented birds and the enigmatic fish, and the implications of this disparity in decision making, implementation, and adaptive management strategies.
Borissova, A; Goltz, G E; Kavanagh, J P; Wilkins, T A
2010-07-01
Crystallization of calcium oxalate monohydrate in a section of a single kidney nephron (distal convoluted tubule) is simulated using a model adapted from industrial crystallization. The nephron fluid dynamics is represented as a crystallizer/separator series with changing volume to allow for water removal along the tubule. The model integrates crystallization kinetics and crystal size distribution and allows the prediction of the calcium oxalate concentration profile and the nucleation and growth rates. The critical supersaturation ratio for the nucleation of calcium oxalate crystals has been estimated as 2 and the mean crystal size as 1 mum. The crystal growth order, determined as 2.2, indicates a surface integration mechanism of crystal growth and crystal growth dispersion. The model allows the exploration of the effect of varying the input calcium oxalate concentration and the rate of water extraction, simulating real life stressors for stone formation such as dietary loading and dehydration.
El-Kady, Ihab F [Albuquerque, NM; Olsson, Roy H [Albuquerque, NM
2012-01-10
Phononic crystals that have the ability to modify and control the thermal black body phonon distribution and the phonon component of heat transport in a solid. In particular, the thermal conductivity and heat capacity can be modified by altering the phonon density of states in a phononic crystal. The present invention is directed to phononic crystal devices and materials such as radio frequency (RF) tags powered from ambient heat, dielectrics with extremely low thermal conductivity, thermoelectric materials with a higher ratio of electrical-to-thermal conductivity, materials with phononically engineered heat capacity, phononic crystal waveguides that enable accelerated cooling, and a variety of low temperature application devices.
12. VIEW FROM MAIN ENTRANCE OF STOVE, ENGINE LATHE, AND ...
12. VIEW FROM MAIN ENTRANCE OF STOVE, ENGINE LATHE, AND GRINDER (L TO R) IN FOREGROUND, SHAFTING ABOVE LOOKING SOUTH. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations. During any of... has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operation poses...
Causes for the decline of suspended-sediment discharge in the Mississippi River system, 1940-2007
Meade, R.H.; Moody, J.A.
2010-01-01
Before 1900, the Missouri-Mississippi River system transported an estimated 400 million metric tons per year of sediment from the interior of the United States to coastal Louisiana. During the last two decades (1987-2006), this transport has averaged 145 million metric tons per year. The cause for this substantial decrease in sediment has been attributed to the trapping characteristics of dams constructed on the muddy part of the Missouri River during the 1950s. However, reexamination of more than 60 years of water- and sediment-discharge data indicates that the dams alone are not the sole cause. These dams trap about 100-150 million metric tons per year, which represent about half the decrease in sediment discharge near the mouth of the Mississippi. Changes in relations between water discharge and suspended-sediment concentration suggest that the Missouri-Mississippi has been transformed from a transport-limited to a supply-limited system. Thus, other engineering activities such as meander cutoffs, river-training structures, and bank revetments as well as soil erosion controls have trapped sediment, eliminated sediment sources, or protected sediment that was once available for transport episodically throughout the year. Removing major engineering structures such as dams probably would not restore sediment discharges to pre-1900 state, mainly because of the numerous smaller engineering structures and other soil-retention works throughout the Missouri-Mississippi system. ?? 2009 John Wiley & Sons, Ltd.
Coesite inclusions in diamonds of Yakutia
NASA Astrophysics Data System (ADS)
Bardukhinov, L. D.; Spetsius, Z. V.; Monkhorov, R. V.
2016-10-01
The results of the study of diamonds with inclusions of high-pressure modification of SiO2 (coesite) by Raman spectroscopy are reported. It is established that the octahedral crystal from the Zapolyarnaya pipe is characterized by the highest residual pressure (2.7 ± 0.07 GPa). An intermediate value of this parameter (2.1 ± 0.07 GPa) was obtained for a crystal of transitional habit from the Maiskaya pipe. The minimal Raman shift was registered for coesite in diamond from the Komsomol'skaya-Magnitnaya pipe and provided a calculated residual pressure of 1.8 ± 0.03 GPa. The residual pressures for crystals from the placer deposits of the Kuoika and Bol'shaya Kuonamka rivers are 2.7 ± 0.07 and 3.1 ± 0.1 GPa, respectively. Octahedral crystals were formed in the mantle at a higher pressure than rhombododecahedral diamonds.
Maghsoodi, Maryam
2015-01-01
Crystallization is often used for manufacturing drug substances. Advances of crystallization have achieved control over drug identity and purity, but control over the physical form remains poor. This review discusses the influence of solvents used in crystallization process on crystal habit and agglomeration of crystals with potential implication for dissolution. According to literature it has been known that habit modification of crystals by use of proper solvents may enhance the dissolution properties by changing the size, number and the nature of crystal faces exposed to the dissolution medium. Also, the faster dissolution rate of drug from the agglomerates of crystals compared with the single crystals may be related to porous structure of the agglomerates and consequently their better wettability. It is concluded from this review that in-depth understanding of role of the solvents in crystallization process can be applied to engineering of crystal habit or crystal agglomeration, and predictably dissolution improvement in poorly soluble drugs. PMID:25789214
NASA Technical Reports Server (NTRS)
VanZante, Judith F.; Rosine, Bryan M.
2014-01-01
The inaugural calibration of the ice crystal and supercooled liquid water clouds generated in NASA Glenn's engine altitude test facility, the Propulsion Systems Lab (PSL) is reported herein. This calibration was in support of the inaugural engine ice crystal validation test. During the Fall of 2012 calibration effort, cloud uniformity was documented via an icing grid, laser sheet and cloud tomography. Water content was measured via multi-wire and robust probes, and particle sizes were measured with a Cloud Droplet Probe and Cloud Imaging Probe. The environmental conditions ranged from 5,000 to 35,000 ft, Mach 0.15 to 0.55, temperature from +50 to -35 F and relative humidities from less than 1 percent to 75 percent in the plenum.
Wetting and Spreading of Molten Volcanic Ash in Jet Engines.
Song, Wenjia; Lavallée, Yan; Wadsworth, Fabian B; Hess, Kai-Uwe; Dingwell, Donald B
2017-04-20
A major hazard to jet engines posed by volcanic ash is linked to the wetting and spreading of molten ash droplets on engine component surfaces. Here, using the sessile drop method, we study the evolution of the wettability and spreading of volcanic ash. We employ rapid temperature changes up to 1040-1450 °C, to replicate the heating conditions experienced by volcanic ash entering an operating jet engine. In this scenario, samples densify as particles coalesce under surface tension until they form a large system-sized droplet (containing remnant gas bubbles and crystals), which subsequently spreads on the surface. The data exhibit a transition from a heterogeneous to a homogeneous wetting regime above 1315 °C as crystals in the drops are dissolved in the melt. We infer that both viscosity and microstructural evolution are key controls on the attainment of equilibrium in the wetting of molten volcanic ash droplets.
Johnson, Jennifer L; Entzminger, Kevin C; Hyun, Jeongmin; Kalyoncu, Sibel; Heaner, David P; Morales, Ivan A; Sheppard, Aly; Gumbart, James C; Maynard, Jennifer A; Lieberman, Raquel L
2015-04-01
Crystallization chaperones are attracting increasing interest as a route to crystal growth and structure elucidation of difficult targets such as membrane proteins. While strategies to date have typically employed protein-specific chaperones, a peptide-specific chaperone to crystallize multiple cognate peptide epitope-containing client proteins is envisioned. This would eliminate the target-specific chaperone-production step and streamline the co-crystallization process. Previously, protein engineering and directed evolution were used to generate a single-chain variable (scFv) antibody fragment with affinity for the peptide sequence EYMPME (scFv/EE). This report details the conversion of scFv/EE to an anti-EE Fab format (Fab/EE) followed by its biophysical characterization. The addition of constant chains increased the overall stability and had a negligible impact on the antigen affinity. The 2.0 Å resolution crystal structure of Fab/EE reveals contacts with larger surface areas than those of scFv/EE. Surface plasmon resonance, an enzyme-linked immunosorbent assay, and size-exclusion chromatography were used to assess Fab/EE binding to EE-tagged soluble and membrane test proteins: namely, the β-barrel outer membrane protein intimin and α-helical A2a G protein-coupled receptor (A2aR). Molecular-dynamics simulation of the intimin constructs with and without Fab/EE provides insight into the energetic complexities of the co-crystallization approach.
Structural analysis of β-glucosidase mutants derived from a hyperthermophilic tetrameric structure
Nakabayashi, Makoto; Kataoka, Misumi; Mishima, Yumiko; Maeno, Yuka; Ishikawa, Kazuhiko
2014-01-01
β-Glucosidase from Pyrococcus furiosus (BGLPf) is a hyperthermophilic tetrameric enzyme which can degrade cellooligosaccharides to glucose under hyperthermophilic conditions and thus holds promise for the saccharification of lignocellulosic biomass at high temperature. Prior to the production of large amounts of this enzyme, detailed information regarding the oligomeric structure of the enzyme is required. Several crystals of BGLPf have been prepared over the past ten years, but its crystal structure had not been solved until recently. In 2011, the first crystal structure of BGLPf was solved and a model was constructed at somewhat low resolution (2.35 Å). In order to obtain more detailed structural data on BGLPf, the relationship between its tetrameric structure and the quality of the crystal was re-examined. A dimeric form of BGLPf was constructed and its crystal structure was solved at a resolution of 1.70 Å using protein-engineering methods. Furthermore, using the high-resolution crystal structural data for the dimeric form, a monomeric form of BGLPf was constructed which retained the intrinsic activity of the tetrameric form. The thermostability of BGLPf is affected by its oligomeric structure. Here, the biophysical and biochemical properties of engineered dimeric and monomeric BGLPfs are reported, which are promising prototype models to apply to the saccharification reaction. Furthermore, details regarding the oligomeric structures of BGLPf and the reasons why the mutations yielded improved crystal structures are discussed. PMID:24598756
Lorenzo, Daniel A; Forrest, Sebastian J K; Sparkes, Hazel A
2016-02-01
A number of hydrogen-bonded co-crystals, consisting of a cinnamic acid derivative and a pyridyl co-crystallizer, have been synthesized and their properties investigated by X-ray diffraction. Samples were prepared by recrystallization or solvent drop grinding of trans-cinnamic acid (1), 4-methylcinnamic acid (2), 4-methoxy cinnamic acid (3) or 3,4-methoxy cinnamic acid (4), with 4,4-dipyridyl (A), iso-nicotinamide (B) or nicotinamide (C). The X-ray single-crystal structures of seven novel co-crystals, obtained through recrystallization, are examined and the hydrogen-bonding interactions discussed. Consistent hydrogen-bonding motifs were observed for samples prepared when using 4,4-dipyridyl (A) or iso-nicotinamide (B) as the co-crystallizing agent. Powder X-ray diffraction analysis of the samples prepared by solvent drop grinding suggests the formation of ten co-crystals.
Explosive performance of HMX/NTO co-crystal
NASA Astrophysics Data System (ADS)
Li, J. C.; Jiao, Q. J.; Gong, Y. G.; Wang, Y. Y.; Liang, T.; Sun, J.
2018-01-01
A new co-crystal explosive of 1,3,5,7-tetranitro-1,3,5,7-tetrazocane (HMX) and 3-nitro-1, 2, 4-triazol-5-one (NTO) in a molar ratio of 1:1 has been prepared by solvent/anti-solvent method. The SEM photographs show that HMX/NTO co-crystals are distinctly different from HMX and NTO crystals. The co-crystals are prisms with well formed crystal surfaces. Thermal analysis results indicate the melting point of the co-crystal is 29.3 °Chigher than that of NTO. Moreover, the co-crystal exhibits a modified mechanical sensitivity. The characteristic height (H50) of impact sensitivity increases 14.8cm, and the explosion percentage (P) of friction sensitivity decreases by 40% compared with HMX. The HMX/NTO co-crystals possess good thermal property and low sensitivity, which mean huge advantages in blasting engineering.
16. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING ...
16. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING EAST This overview of the 1883 Pittston Engine and Machine Company steam engine includes the flywheel and pillowblock in the foreground, with the shaft and cylinder in the background. The engine is a horizontal, slide valve type of 30 inch bore and 60 inch stroke that turned the fan at 49 revolutions per minute. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
Final Environmental Assessment: Evaluation of J-85-5 Engine Test Burn
2005-01-01
is highest in winter when birds migrate from the north. Most of the birds congregate during the winter at Reelfoot Lake and Dale Hollow Reservoir...Hydrological features include surface waters ( lakes , rivers, streams, and springs) and groundwater. Arnold AFB lies within the Duck River and the Elk...Smaller creeks R ow la nd C re ek Crumpton Creek Sinking Pond Woods Reservoir Normandy Lake Tims Ford Lake Retention Reservoir Duck River Figure 3-1 0
Geotechnical Engineering in US Elementary Schools
ERIC Educational Resources Information Center
Suescun-Florez, Eduardo; Iskander, Magued; Kapila, Vikram; Cain, Ryan
2013-01-01
This paper reports on the results of several geotechnical engineering-related science activities conducted with elementary-school students. Activities presented include soil permeability, contact stress, soil stratigraphy, shallow and deep foundations, and erosion in rivers. The permeability activity employed the LEGO NXT platform for data…
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
13. Photocopy of engineering drawing (original drawing located in WWP ...
13. Photocopy of engineering drawing (original drawing located in WWP Building, Transmission Department, Spokane, Washington). DIMENSIONS AND DETAILS OF STEEL TOWERS, LITTLE FALLS TIE LINE. - Little Falls Tie Line Towers, Near Little Dam Falls on Spokane River, Wellpinit, Stevens County, WA
18. Photocopy of a drawing (from the Corps of Engineers ...
18. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 3) SECTION THROUGH BRIDGE 808 AND THE DAM - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
Engineering and Characterizing Light-Matter Interactions in Photonic Crystals
2010-01-01
photonic crystal effects would occur at wavelengths in the infrared spectrum. These effects would not be easily measured by our available...spectrometers which operate in the visible and near- infrared , at wavelengths shorter than 1.6 microns. Similarly, the majority of interesting luminescent...periodicity of the photonic crystal is defined by the high -throughput method while the low-throughput method performs the complementary task of adding a
Sukarno; Law, Cheryl Suwen; Santos, Abel
2017-06-08
We present the first realisation of linear variable bandpass filters in nanoporous anodic alumina (NAA-LVBPFs) photonic crystal structures. NAA gradient-index filters (NAA-GIFs) are produced by sinusoidal pulse anodisation and used as photonic crystal platforms to generate NAA-LVBPFs. The anodisation period of NAA-GIFs is modified from 650 to 850 s to systematically tune the characteristic photonic stopband of these photonic crystals across the UV-visible-NIR spectrum. Then, the nanoporous structure of NAA-GIFs is gradually widened along the surface under controlled conditions by wet chemical etching using a dip coating approach aiming to create NAA-LVBPFs with finely engineered optical properties. We demonstrate that the characteristic photonic stopband and the iridescent interferometric colour displayed by these photonic crystals can be tuned with precision across the surface of NAA-LVBPFs by adjusting the fabrication and etching conditions. Here, we envisage for the first time the combination of the anodisation period and etching conditions as a cost-competitive, facile, and versatile nanofabrication approach that enables the generation of a broad range of unique LVBPFs covering the spectral regions. These photonic crystal structures open new opportunities for multiple applications, including adaptive optics, hyperspectral imaging, fluorescence diagnostics, spectroscopy, and sensing.
Crystallization techniques in wastewater treatment: An overview of applications.
Lu, Haijiao; Wang, Jingkang; Wang, Ting; Wang, Na; Bao, Ying; Hao, Hongxun
2017-04-01
As a by-product of industrial or domestic activities, wastewater of different compositions has caused serious environmental problems all over the world. Facing the challenge of wastewater treatment, researchers have begun to make use of crystallization techniques in wastewater treatment. Crystallization techniques have many advantages, such as high efficiency, energy saving, low costs, less space occupation and so on. In recent decades, crystallization is considered as one of promising techniques for wastewater treatment, especially for desalination, water and salt recovery. It has been widely used in engineering applications all over the world. In this paper, various crystallization techniques in wastewater treatment are summarized, mainly including evaporation crystallization, cooling crystallization, reaction crystallization, drowning-out crystallization and membrane distillation crystallization. Overall, they are mainly used for desalination, water and salt recovery. Their applications, advantages and disadvantages were compared and discussed in detail. Copyright © 2017 Elsevier Ltd. All rights reserved.
Review of waterpower withdrawals in Weiser River Basin, Idaho
Colbert, Jesse Lane; Young, Loyd L.
1964-01-01
The Weiser River basin is primarily agricultural and is supported by extensive irrigation. The Geological Survey has initiated withdrawals, or has made powersite classifications of lands having value for reservoir sites and for waterpower production. These withdrawals have been examined to see if they should continue in force or if it is in the public interest to restore them. The 1960 report, "Upper Snake River Basin," by the U.S. bureau of Reclamation, and U.S. Army Corps of Engineers included recommendations conooming potential water resource-development sites in Water River basin. That report furnished much of the information for this review.
Konrad, Christopher P.
2010-01-01
The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.
NASA Astrophysics Data System (ADS)
Sunardi; Sukandar; Setionohadi, B.; Sulkhani, E.; Sambah, A. B.; Pamungkas, S.
2018-04-01
River is the only access to enter the pond area in Ujung Pangkah District, Gresik. The area is difficult to access due to the siltation of the river with only 50 cm depth. In addition, rent for traditional boat is expensive. This research developed a design of a small boat efficient enough to transport fish farmer from and to the pond area. Engine from motorcycle was used as it was easy to operate and economical use of fuel. The fundamental change for this design was a small double-hulled low-lane vessel. The motor matic engine was adjusted to a propeller to get maximum boost. The results showed that a ship with 3 meters length, 1.2 meters width and 1 m height, 2 persons in charge and speed of 7 knots, could use 150cc automatic motor engine by lowering engine rotation (RPM) from 7000 RPM to 4500 RPM using a Gear Box and 4-leaf B-Serries blades with a diameter of 14 cm.
Silicon Carbide in Heavy-Mineral Samples: Indicator of Diamond Deposits
NASA Astrophysics Data System (ADS)
Leung, I. S.; Wang, W.
2013-12-01
Since kimberlite Pipe 50 of Wafangdian, 120 km northeast of the port city Dalian in Liaoning Province, ceased production in 2002, exploration programs have been conducted along tributaries of the Fuzhou River south of Wafangdian. The heavy-mineral method is often based on finding deep red G10 pyrope garnets which can be identified accurately by means of microprobe analysis to confirm their particular range of composition: high chromium, low calcium. Garnets are prone to hydrothermal alteration during kimberlite eruption, oxidation on Earth's surface, or be broken during mass transport. Unlike garnet, silicon carbide (SiC) resists chemical and mechanical alterations, but it crystallized at similarly high temperatures as diamond in Earth's mantle, and has the same atomic structure as diamond. Thus, SiC seems to be an ideal diamond indicator, although it is one of the rarest minerals in nature. Because of its characteristic blue-green color and adamantine luster, it can be recognized easily, no matter how minute the grains may be. We decided to re-examine small samples of heavy minerals collected and previously studied by exploration geologists, respectively from 3 tributaries of the Fuzhou River (Laogugao, Saocentun, Pingiaying), and from 3 ravines in the vicinity of Wafangdian (Songiagao, Dlitun, Lidianzhun), among which Songiagao, flowing into Qingnian Reservoir, is apparently a pristine water system, unpolluted by human activities. We found one grain of SiC in all the samples. From Fuzhou River: (1) Blue-green, euhedral, hexagonal shape, water-clear, one edge slightly chipped. (2) Light green, slightly corroded edges. (3) Green, half of the crystal's surface is covered by a blister-like yellow overgrowth; this material protrudes out on one side like a thick tapering paint brush. From Wafandian Vicinity: (1) Blue-green, with patchy black edges. (2) Green, with deep green rims and one brown inclusion. (3) Pale green, subhedral with one beige inclusion. All the crystals show various hues of green and blue, variable color saturation both within itself and between different grains. All crystals have different shapes, forms, coatings, types of reaction rims, while two crystals carry one or two inclusions, The multitude of features suggests a history of intricacies in the growth environment, an implication worthy of our contemplation as we try to understand the problem of diamond genesis.
1980-03-01
Engineering Branch Engineering Division CARNEY M. TERZIAN, KENBER Design Branch Engineering Division RICHARD DIBKO CHIRA Water Control Branch...State of New Hampshire. Authorization and notice to proceed were issued to S E A Consultants Inc. under a letter of November 5, 1979 from William
NASA Astrophysics Data System (ADS)
Bowles, C.
2013-12-01
Ecological engineering, or eco engineering, is an emerging field in the study of integrating ecology and engineering, concerned with the design, monitoring, and construction of ecosystems. According to Mitsch (1996) 'the design of sustainable ecosystems intends to integrate human society with its natural environment for the benefit of both'. Eco engineering emerged as a new idea in the early 1960s, and the concept has seen refinement since then. As a commonly practiced field of engineering it is relatively novel. Howard Odum (1963) and others first introduced it as 'utilizing natural energy sources as the predominant input to manipulate and control environmental systems'. Mtisch and Jorgensen (1989) were the first to define eco engineering, to provide eco engineering principles and conceptual eco engineering models. Later they refined the definition and increased the number of principles. They suggested that the goals of eco engineering are: a) the restoration of ecosystems that have been substantially disturbed by human activities such as environmental pollution or land disturbance, and b) the development of new sustainable ecosystems that have both human and ecological values. Here a more detailed overview of eco engineering is provided, particularly with regard to how engineers and ecologists are utilizing multi-dimensional computational models to link ecology and engineering, resulting in increasingly successful project implementation. Descriptions are provided pertaining to 1-, 2- and 3-dimensional hydrodynamic models and their use at small- and large-scale applications. A range of conceptual models that have been developed to aid the in the creation of linkages between ecology and engineering are discussed. Finally, several case studies that link ecology and engineering via computational modeling are provided. These studies include localized stream rehabilitation, spawning gravel enhancement on a large river system, and watershed-wide floodplain modeling of the Sacramento River Valley.
National Waterways Study. Engineering Analysis of Waterways Systems.
1981-08-01
Waterway between Lewiston , Idaho and Bonneville Lock and Dam. Eight locks are present on this segment. All, except Bonneville, have 675’x86’ chambers...Island Bar Every 5 years Dec. 1972 68,000 319 The Columbia River, above the Bonneville Lock to and including the Snake River at Lewiston , Idaho is com
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... structure and is aligned with water management activities during recent flood and drought events in the... operating activities concerned with water management within the Greater Mississippi River Basin. The Greater... require coordination of basin-wide water management activities. b. To serve as a forum for discussion of...
1. VIEW OF LOCKS, LOOKING NORTHEAST Photocopy of photograph, ca. ...
1. VIEW OF LOCKS, LOOKING NORTHEAST Photocopy of photograph, ca. 1980, courtesy of U.S. Engineer Office, St. Louis, Missouri. Original print is on file at Mississippi River Lock and Dam No. 27 in Granite City, Illinois. - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
33 CFR 207.340 - Reservoirs at headwaters of the Mississippi River; use and administration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Reservoirs at headwaters of the... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.340 Reservoirs at headwaters of the Mississippi River; use and administration. (a) Description. These reservoirs include...
33 CFR 207.340 - Reservoirs at headwaters of the Mississippi River; use and administration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Reservoirs at headwaters of the... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.340 Reservoirs at headwaters of the Mississippi River; use and administration. (a) Description. These reservoirs include...
19. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
19. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. DETAILS FOR PIERS NO. 1, 2, 5 & 6. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. GENERAL PLAN AND ELEVATION OF BRIDGE. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
11. Photographic copy of lines drawing of original construction (24 ...
11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN
In the Chicago area, treated wastewater and storm water flow through the engineered Chicago River system to the Mississippi River, with the goal to protect Lake Michigan from urban discharges. Therefore, under dry weather conditions, nearby Lake Michigan recreational beaches shou...
NASA Astrophysics Data System (ADS)
Santos, Abel; Law, Cheryl Suwen; Pereira, Taj; Losic, Dusan
2016-04-01
Herein, we present a method for storing binary data within the spectral signature of nanoporous anodic alumina photonic crystals. A rationally designed multi-sinusoidal anodisation approach makes it possible to engineer the photonic stop band of nanoporous anodic alumina with precision. As a result, the transmission spectrum of these photonic nanostructures can be engineered to feature well-resolved and selectively positioned characteristic peaks across the UV-visible spectrum. Using this property, we implement an 8-bit binary code and assess the versatility and capability of this system by a series of experiments aiming to encode different information within the nanoporous anodic alumina photonic crystals. The obtained results reveal that the proposed nanosized platform is robust, chemically stable, versatile and has a set of unique properties for data storage, opening new opportunities for developing advanced nanophotonic tools for a wide range of applications, including sensing, photonic tagging, self-reporting drug releasing systems and secure encoding of information.Herein, we present a method for storing binary data within the spectral signature of nanoporous anodic alumina photonic crystals. A rationally designed multi-sinusoidal anodisation approach makes it possible to engineer the photonic stop band of nanoporous anodic alumina with precision. As a result, the transmission spectrum of these photonic nanostructures can be engineered to feature well-resolved and selectively positioned characteristic peaks across the UV-visible spectrum. Using this property, we implement an 8-bit binary code and assess the versatility and capability of this system by a series of experiments aiming to encode different information within the nanoporous anodic alumina photonic crystals. The obtained results reveal that the proposed nanosized platform is robust, chemically stable, versatile and has a set of unique properties for data storage, opening new opportunities for developing advanced nanophotonic tools for a wide range of applications, including sensing, photonic tagging, self-reporting drug releasing systems and secure encoding of information. Electronic supplementary information (ESI) available: Further details about anodisation profiles, SEM cross-section images, digital pictures, transmission spectra, photonic barcodes and ASCII codes of the different NAA photonic crystals fabricated and analysed in our study. See DOI: 10.1039/c6nr01068g
Wang, Chenguang; Hu, Shenye; Sun, Changquan Calvin
2017-10-02
A palatable direct compression (DC) orally disintegrating tablet (ODT) product of a bitter drug, diphenhydramine (DPH), was developed using an integrated crystal and particle engineering approach. A DPH salt with a sweetener, acesulfame (Acs), DPH-Acs, was synthesized and its solid state properties were comprehensively characterized. Tablet formulation composition and compaction parameters were optimized by employing material sparing techniques. In vivo disintegration time, bitterness, and grittiness of the final ODT product, were evaluated by a taste panel. Physical stability of the ODT tablets was assessed to identify appropriate storage conditions. Phase-pure DPH-Acs exhibited significantly better tabletability and palatability than DPH-HCl. A DC formulation was designed and optimized to obtain a new ODT product with good manufacturability and excellent product characteristics, including fast in vivo disintegration, and acceptable bitterness and grittiness. A new ODT product of DPH with excellent pharmaceutical properties was successfully developed using 15 g of DPH and in two months. This example shows that integrated crystal and particle engineering is an effective approach for developing high quality ODT products using the DC process.
van 't Hag, Leonie; Gras, Sally L; Conn, Charlotte E; Drummond, Calum J
2017-05-22
Ordered amphiphile self-assembly materials with a tunable three-dimensional (3D) nanostructure are of fundamental interest, and crucial for progressing several biological and biomedical applications, including in meso membrane protein crystallization, as drug and medical contrast agent delivery vehicles, and as biosensors and biofuel cells. In binary systems consisting of an amphiphile and a solvent, the ability to tune the 3D cubic phase nanostructure, lipid bilayer properties and the lipid mesophase is limited. A move beyond the binary compositional space is therefore required for efficient engineering of the required material properties. In this critical review, the phase transitions upon encapsulation of more than 130 amphiphilic and soluble additives into the bicontinuous lipidic cubic phase under excess hydration are summarized. The data are interpreted using geometric considerations, interfacial curvature, electrostatic interactions, partition coefficients and miscibility of the alkyl chains. The obtained lyotropic liquid crystal engineering design rules can be used to enhance the formulation of self-assembly materials and provides a large library of these materials for use in biomedical applications (242 references).
Romanenko works with the Coulomb Crystal Experiment in the MRM-2
2013-01-28
ISS034-E-035764 (28 Jan. 2013) --- In the International Space Station?s Poisk Mini-Research Module 2 (MRM2), Russian cosmonaut Roman Romanenko, Expedition 34 flight engineer, works with the Coulomb Crystal experiment, which gathers data about charged particles in a weightless environment.
76 FR 65751 - Notice of intent to grant exclusive license
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Crystalline Semiconductor Alloys on Basal Plane of Trigonal or Hexagonal Crystal,'' U.S. Patent Application No. 12/254,134 entitled ``Hybrid Bandgap Engineering for Super-Hetero- Epitaxial Semiconductor Materials... Semiconductor Materials on Trigonal Substrate with Single Crystal Properties and Devices Based on Such Materials...
Ball, Lyndsay B.; Burton, Bethany L.; Powers, Michael H.; Asch, Theodore H.
2015-01-01
To characterize the extent and thickness of lithologic units that may have differing scour potential, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, has performed several geoelectrical surveys of the lower American River channel and flood plain between Cal Expo and the Rio Americano High School in east Sacramento, California. Additional geotechnical data have been collected by the U.S. Army Corps of Engineers and its contractors. Data resulting from these surveys have been compiled into similar database formats and converted to uniform geospatial datums and projections. These data have been visualized in a digital three-dimensional framework project that can be viewed using freely available software. These data facilitate a comprehensive analysis of the resistivity structure underlying the lower American River corridor and assist in levee system management.
Ground-water conditions in the central Virgin River basin, Utah
Cordova, R.M.; Sandberg, G.W.; McConkie, Wilson
1972-01-01
Water-rights problems have occurred in the central Virgin River basin and are expected to increase as development of the water resources increases. The Utah State Engineer needs a basic knowledge of ground-water conditions and of the relation of ground water to surface water as a first step to understanding and resolving the problems. Accordingly, the State Engineer requested the U. S. Geological Survey to make a ground-water investigation of the central Virgin River basin as part of the Statewide cooperative agreement with the Utah Department of Natural Resources. The investigation was begun July 1, 1968, and fieldwork was completed in August 1970. Detailed information was obtained for the principal aquifers and for recharge, movement, discharge, storage, utilization, and chemical quality of ground water. A progress report (Cordova, Sandberg, and McConkie, 1970) describes the general findings in the first year of the investigation.
Crystals of Human Serum Albumin for Use in Genetic Engineering and Rational Drug Design
NASA Technical Reports Server (NTRS)
Carter, Daniel C. (Inventor)
1994-01-01
This invention pertains to crystals of serum albumin and processes for growing them. The purpose of the invention is to provide crystals of serum albumin which can be studied to determine binding sites for drugs. Form 2 crystals grow in the monoclinic space P2(sub 1), and possesses the following unit cell constraints: a = 58.9 +/- 7, b = 88.3 +/- 7, c = 60.7 +/- 7, Beta = 101.0 +/- 2 degrees. One advantage of the invention is that it will allow rational drug design
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-03
... provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are... Regulatory Commission. David J. Wrona, Projects Branch 2, Division of License Renewal, Office of Nuclear...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vavrinec, John; Pearson, Walter H.; Kohn, Nancy P.
2007-05-07
Dredging of the Columbia River navigation channel has raised concerns about dredging-related impacts on Dungeness crabs (Cancer magister) in the estuary, mouth of the estuary, and nearshore ocean areas adjacent to the Columbia River. The Portland District, U.S. Army Corps of Engineers engaged the Marine Sciences Laboratory (MSL) of the U.S. Department of Energy’s Pacific Northwest National Laboratory to review the state of knowledge and conduct studies concerning impacts on Dungeness crabs resulting from disposal during the Columbia River Channel Improvement Project and annual maintenance dredging in the mouth of the Columbia River. The present study concerns potential effects onmore » Dungeness crabs from dredged material disposal specific to the mouth of the Columbia River.« less
10. Photocopied from Photo 1162, Nunns Station Folder, Engineering Department, ...
10. Photocopied from Photo 1162, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. PENSTOCKS, c. 1920? - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
26. Photocopied from Photo 1217, Olmstead Folder #2, Engineering Department, ...
26. Photocopied from Photo 1217, Olmstead Folder #2, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. MACHINE SHOP -- LAB. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
27. Photocopied from Photo 1216, Olmstead Folder #2, Engineering Department, ...
27. Photocopied from Photo 1216, Olmstead Folder #2, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. MACHINE SHOP -- LAB. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
42. NORTHEAST VIEW OF BLOW ENGINE HOUSE No. 3, WITH ...
42. NORTHEAST VIEW OF BLOW ENGINE HOUSE No. 3, WITH FILTER CAKE HOSUE IN CENTER FOREGROUND, AND EVAPORATIVE WASTE WATER TREATMENT COOLING TOWER TO THE LEFT. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA
17. Photocopy of a drawing (from the Corps of Engineers ...
17. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 2) FRONT ELEVATION AND PLAN VIEW OF BRIDGE 808 IN 1979 - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
Sustainable water management under future uncertainty with eco-engineering decision scaling
NASA Astrophysics Data System (ADS)
Poff, N. Leroy; Brown, Casey M.; Grantham, Theodore E.; Matthews, John H.; Palmer, Margaret A.; Spence, Caitlin M.; Wilby, Robert L.; Haasnoot, Marjolijn; Mendoza, Guillermo F.; Dominique, Kathleen C.; Baeza, Andres
2016-01-01
Managing freshwater resources sustainably under future climatic and hydrological uncertainty poses novel challenges. Rehabilitation of ageing infrastructure and construction of new dams are widely viewed as solutions to diminish climate risk, but attaining the broad goal of freshwater sustainability will require expansion of the prevailing water resources management paradigm beyond narrow economic criteria to include socially valued ecosystem functions and services. We introduce a new decision framework, eco-engineering decision scaling (EEDS), that explicitly and quantitatively explores trade-offs in stakeholder-defined engineering and ecological performance metrics across a range of possible management actions under unknown future hydrological and climate states. We illustrate its potential application through a hypothetical case study of the Iowa River, USA. EEDS holds promise as a powerful framework for operationalizing freshwater sustainability under future hydrological uncertainty by fostering collaboration across historically conflicting perspectives of water resource engineering and river conservation ecology to design and operate water infrastructure for social and environmental benefits.
Sustainable water management under future uncertainty with eco-engineering decision scaling
Poff, N LeRoy; Brown, Casey M; Grantham, Theodore E.; Matthews, John H; Palmer, Margaret A.; Spence, Caitlin M; Wilby, Robert L.; Haasnoot, Marjolijn; Mendoza, Guillermo F; Dominique, Kathleen C; Baeza, Andres
2015-01-01
Managing freshwater resources sustainably under future climatic and hydrological uncertainty poses novel challenges. Rehabilitation of ageing infrastructure and construction of new dams are widely viewed as solutions to diminish climate risk, but attaining the broad goal of freshwater sustainability will require expansion of the prevailing water resources management paradigm beyond narrow economic criteria to include socially valued ecosystem functions and services. We introduce a new decision framework, eco-engineering decision scaling (EEDS), that explicitly and quantitatively explores trade-offs in stakeholder-defined engineering and ecological performance metrics across a range of possible management actions under unknown future hydrological and climate states. We illustrate its potential application through a hypothetical case study of the Iowa River, USA. EEDS holds promise as a powerful framework for operationalizing freshwater sustainability under future hydrological uncertainty by fostering collaboration across historically conflicting perspectives of water resource engineering and river conservation ecology to design and operate water infrastructure for social and environmental benefits.
Camprubí, Lino
2012-03-01
After the Spanish Civil War (1936-1939), Francisco Franco's emphasis on dam building became so intense that it is still today associated with his dictatorial rule. Rather than being purely a personal obsession, however, this intensive period of reservoir construction was the result of the influential political role played by engineers from the early years of the regime. During the years 1946-1961 some of these engineers undertook the 'total transformation' of the Noguera Ribagorzana river basin in the Catalonian Pyrenees. But this explicitly 'totalitarian' project encountered important limitations posed both by competing state agencies and by the basin's geology. Analysing the efforts of these engineers allows for new understandings of the Francoist regime and of the place of science, technology, and the landscape within it. Copyright © 2011 Elsevier Ltd. All rights reserved.
Comparison of measured and computed phase functions of individual tropospheric ice crystals
NASA Astrophysics Data System (ADS)
Stegmann, Patrick G.; Tropea, Cameron; Järvinen, Emma; Schnaiter, Martin
2016-07-01
Airplanes passing the incuda (lat. anvils) regions of tropical cumulonimbi-clouds are at risk of suffering an engine power-loss event and engine damage due to ice ingestion (Mason et al., 2006 [1]). Research in this field relies on optical measurement methods to characterize ice crystals; however the design and implementation of such methods presently suffer from the lack of reliable and efficient means of predicting the light scattering from ice crystals. The nascent discipline of direct measurement of phase functions of ice crystals in conjunction with particle imaging and forward modelling through geometrical optics derivative- and Transition matrix-codes for the first time allow us to obtain a deeper understanding of the optical properties of real tropospheric ice crystals. In this manuscript, a sample phase function obtained via the Particle Habit Imaging and Polar Scattering (PHIPS) probe during a measurement campaign in flight over Brazil will be compared to three different light scattering codes. This includes a newly developed first order geometrical optics code taking into account the influence of the Gaussian beam illumination used in the PHIPS device, as well as the reference ray tracing code of Macke and the T-matrix code of Kahnert.
2011-07-01
A relatively small portion of this accreted land would be removed by the proposed project and returned to the River. U.S. Army Corps of Engineers... Planting a portion of the site currently utilized for row-crop agriculture to native hardwood tree species. • Gradual sloping of the new River...the change would be localized and so small that it would not be of any measurable or perceptible consequence. Minor: Impact could result in a
1988-05-01
Engineer Water Resources Support Center, Fort Belvoir, Va. Conner, J. W., Pennington, C. H., and Bosley, T. R. 1983. "Larval Fish of Selected Aquatic ...Mississippi River Environmental Program; Report 13 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Aquatic Ecosystem...Jenkins, Aquatic Ecosystem Analysts, PO Box 4188, Fayetteville, Ark. Mr. Stephen P. Cobb, MRC, Vicksburg, Miss., was the project officer and program manager
1990-12-01
ROAD LOCK AND DAM ILLINOIS RIVER L IL CEDARS LOCK AND DAM (KIMBERLY DAM) FOX RIVER L WI CORALVILLE LAKE AND DAM IOWA RIVER R IA DEPERE LOCK AND DAM FOX...Mississippi upstream to Sioux City, Iowa below Gavins Point Dam. Drought results in lower streamflow and a shorter navigation season. Lower streamflow may...897 of the previous month. Classification system. Palmer (1965) used drought data from central Iowa and western Kansas to plot a graph of accumulated
NASA Astrophysics Data System (ADS)
Wang, Bo; Xu, Y. Jun
2018-01-01
Channel bars are a major depositional feature in alluvial rivers and their morphodynamics has been investigated intensively in the past several decades. However, relatively less is known about how channel bars in alluvial rivers respond to river engineering and regulations. In this study, we assessed 30-yr morphologic changes of 30 large emerged bars located in a 223 km reach of the highly regulated Lower Mississippi River from Vicksburg, Mississippi, to the Mississippi-Atchafalaya River diversion. Landsat imagery and river stage data between 1985 and 2015 were utilized to characterize bar morphologic features and quantify decadal changes. Based on bar surface areas estimated with the satellite images at different river stages, a rating curve was developed for each of the 30 bars to determine their volumes. Results from this study show that the highly regulated river reach favored the growth of mid-channel and attached bars, while more than half of the point bars showed degradation. Currently, the mid-channel and attached bars accounted for 38% and 34% of the total volume of the 30 bars. The average volume of a single mid-channel bar is over two times that of an attached bar and over four times that of a point bar. Overall, in the past three decades, the total volume of the studied 30 bars increased by 110,118,000 m3 (41%). Total dike length in a dike field was found mostly contributing to the bar volume increase. Currently, the emerged volume of the 30 bars was estimated approximately 378,183,000 m3. The total bar volume is equivalent to 530 million metric tons of coarse sand, based on an average measured bulk density of 1.4 t/m3 for the bar sediment. The findings show that these bars are large sediment reservoirs.
Williams, Marshall L.; Fosness, Ryan L.; Weakland, Rhonda J.
2012-01-01
The U.S. Geological Survey conducted a bathymetric survey of the Lower Granite Reservoir, Washington, using a multibeam echosounder, and an underwater video mapping survey during autumn 2009 and winter 2010. The surveys were conducted as part of the U.S. Army Corps of Engineer's study on sediment deposition and control in the reservoir. The multibeam echosounder survey was performed in 1-mile increments between river mile (RM) 130 and 142 on the Snake River, and between RM 0 and 2 on the Clearwater River. The result of the survey is a digital elevation dataset in ASCII coordinate positioning data (easting, northing, and elevation) useful in rendering a 3×3-foot point grid showing bed elevation and reservoir geomorphology. The underwater video mapping survey was conducted from RM 107.73 to 141.78 on the Snake River and RM 0 to 1.66 on the Clearwater River, along 61 U.S. Army Corps of Engineers established cross sections, and dredge material deposit transects. More than 900 videos and 90 bank photographs were used to characterize the sediment facies and ground-truth the multibeam echosounder data. Combined, the surveys were used to create a surficial sediment facies map that displays type of substrate, level of embeddedness, and presence of silt.
Towards River Rehabilitation as AN Integrated Approach to Flood Management in Asian Cities
NASA Astrophysics Data System (ADS)
Higgitt, David L.
Flood management in Asian cities has conventionally been approached through structural intervention where floods are regarded as a threat requiring control through engineering infrastructure. Such a command and control paradigm represents a marked transition from the way that monsoon flood regimes have been traditionally perceived across Asia. Rapid urbanization and climate change has imposed increasingly difficult flood management challenges as an extension of impermeable surfaces generates rapid runoff and flash flooding, while cities expand into flood-prone areas. Property and communities are placed at enhanced risk. Urbanization reallocates risk as channel and floodplain modification influences flood regimes, while demands for flood protection at certain locations can redistribute risk to other areas. An increasing concern about flood hazard across Asian cities questions whether conventional solutions reliant on structural intervention are sustainable. Such questioning is mirrored by an alternative paradigm of rehabilitation in integrated river basin management — a recognition that restoring and sustaining functional river ecosystems with high biodiversity is one of the greatest challenges facing society. Rehabilitation initiatives demand a new approach to river basin management which encourage interdisciplinary activity, particularly between engineers, hydrologists, geomorphologists and ecologists. The paper sets out some preliminary ideas from a research project investigating the potential for river rehabilitation as a central tenet of flood management, with a particular focus on Asian cities.
Thompson, Ryan F.; Johnson, Michaela R.; Andersen, Michael J.
2007-01-01
The U.S. Army Corps of Engineers has constructed emergent sandbar habitat on sections of the Missouri River bordering South Dakota and Nebraska downstream from Gavins Point Dam to create and enhance habitat for threatened and endangered bird species. Two areas near river miles 761.3 and 769.8 were selected for construction of emergent sandbar habitat. Pre- and postconstruction data were collected by the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, to evaluate the success of the habitat management techniques. Data collected include pre- and postconstruction channel-geometry data (bathymetric and topographic) for areas upstream from, downstream from, and within each construction site. Water-velocity data were collected for selected parts of the site near river mile 769.8. Instruments and methods used in data collection, as well as quality-assurance and quality-control measures, are described. Geospatial channel-geometry data are presented for transects of the river channel as cross sections and as geographical information system shapefiles. Geospatial land-surface elevation data are provided for part of each site in the form of a color-shaded relief map. Geospatial water-velocity data also are provided as color-shaded maps and geographical information system shapefiles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartholomay, R.C.; Orr, B.R.; Liszewski, M.J.
Radiochemical and chemical wastewater discharged since 1952 to infiltration ponds and disposal wells at the Idaho National Engineering Laboratory (INEL) has affected water quality in the Snake River Plain aquifer. The U.S. Geological Survey, in cooperation with the U.S. Department of Energy, maintains a continuous monitoring network at the INEL to determine hydrologic trends and to delineate the movement of radiochemical and chemical wastes in the aquifer. This report presents an analysis of water-level and water-quality data collected from the Snake River Plain aquifer during 1989-91. Water in the eastern Snake River Plain aquifer moves principally through fractures and interflowmore » zones in basalt, generally flows southwestward, and eventually discharges at springs along the Snake River. The aquifer is recharged principally from irrigation water, infiltration of streamflow, and ground-water inflow from adjoining mountain drainage basins. Water levels in wells throughout the INEL generally declined during 1989-91 due to drought. Detectable concentrations of radiochemical constituents in water samples from wells in the Snake River Plain aquifer at the INEL decreased or remained constant during 1989-91. Decreased concentrations are attributed to reduced rates of radioactive-waste disposal, sorption processes, radioactive decay, and changes in waste-disposal practices. Detectable concentrations of chemical constituents in water from the Snake River Plain aquifer at the INEL were variable during 1989-91. Sodium and chloride concentrations in the southern part of the INEL increased slightly during 1989-91 because of increased waste-disposal rates and a lack of recharge from the Big Lost River. Plumes of 1,1,1-trichloroethane have developed near the Idaho Chemical Processing Plant and the Radioactive Waste Management Complex as a result of waste disposal practices.« less
Bedinger, M.S.; Reed, J.E.; Wells, C.J.; Swafford, B.F.
1970-01-01
The Arkansas River Multiple-Purpose Plan will provide year-round navigation on the Arkansas River from near its mouth to Muskogee, Okla., and on the Verdigris River from Muskogee to Catoosa, Okla. The altered regimen in the Arkansas and Verdigris Rivers will affect ground-water conditions in the adjacent alluvial aquifers. In 1957 the U.S. Geological Survey and U.S. Army Corps of Engineers entered into a cooperative agreement for a comprehensive ground-water study of the lower Arkansas and Verdigris River valleys. At the request of the Corps of Engineers, the Geological Survey agreed to provide (1) basic ground-water data before, during, and after construction of the Multiple-Purpose Plan and (2) interpretation and projections of postconstruction ground-water conditions. The data collected were used by the Corps of Engineers in preliminary foundation and excavation estimates and by the Geological Survey as the basis for defining the hydrologic properties of, and the ground-water conditions in, the aquifer. The projections of postconstruction ground-water conditions were used by the Corps of Engineers in the planning, design, construction, and operation of the Multiple-Purpose Plan. Analysis and projections of ground-water conditions were made by use of electrical analog models. These models use the analogy between the flow of electricity in a resistance-capacitance circuit and the flow of a liquid in a porous and permeable medium. Verification provides a test of the validity of the analog to perform as the aquifer would, within the range of historic forces. The verification process consists of simulating the action of historic forces which have acted upon the aquifer and of duplicating the aquifer response with the analog. The areal distribution of accretion can be treated as an unknown and can be determined by analog simulation of the piezometric surface in an aquifer. Comparison of accretion with depth to piezometric surface below land surface shows that accretion decreases with decreasing depth to water level. The decrease in accretion is attributed mostly to the increase in evapotranspiration from the aquifer, and where water levels are very near the land surface, to the rejection of recharge. The maximum accretion and the decrease in accretion with the decrease in depth to water are dependent upon the climate and the thickness and lithology of the fine-grained material overlying the aquifer. Dams on the Arkansas and Verdigris Rivers will impose a direct change in water levels in the aquifers adjacent to the rivers. This change will be attenuated by the resultant change in accretion to the aquifer. The analogs of aquifers in the valleys were used to determine the change in ground-water level from preconstruction to postconstruction conditions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poirier, M.R.
2002-06-07
Personnel performed engineering-scale tests at the Filtration Research Engineering Demonstration (FRED) to determine crossflow filter performance with a 5.6 M sodium solution containing varying concentrations of sludge and sodium permanganate. The work represents another in a series of collaborative efforts between the University of South Carolina and the Savannah River Technology Center in support of the process development efforts for the Savannah River Site. The current tests investigated filter performance with slurry containing simulated Tank 40H Sludge and sodium permanganate at concentrations between 0.070 weight percent and 3.04 weight percent insoluble solids.
Newell, Wayne L.; Stone, B.; Harrison, R.; ,
2004-01-01
Holocene alluvium of the Pedhicos River around Lefkosia (Nicosia), Cyprus, was studied. Alluvial stratigraphy was found to present serial flood deposits underlying river terraces and an extensive alluvial fan. It was found that the stratigraphy and geomorphology of the alluvium can be interpreted to distinguish not only the effects of climate change, but also land-use change, and the impact of particular engineering works. It was suggested that details of the physical properties of the flood deposit sequences and paleosols can contribute to modeling various geophysical and engineering properties and in predicting response to vertical acceleration during earthquakes.
NASA Astrophysics Data System (ADS)
Toussaint, Bert
In this paper, the author wants to explore the knowledge development in two crucial fields, river management and coast management in the 19th century and first decades of the 20th century. Were there similar characteristics in this development? Which types of knowledge can be distinguished? Who were the principal actors in these processes? Did the knowledge evolution have a Dutch stamp or a rather international flavour? To structure the analysis, the author uses the concept of technology regime, a set of technical rules which shapes the know-how of engineers, their design rules and research processes. The analysis shows that the knowledge development of river management and coastal management followed different evolution paths between 1800 and 1940. In the field of river management, a substantial amount of mathematical and physical theories had been gradually developed since the end of the 17th century. After 1850, the regularization approach met gradually a widespread support. Empirical data, design rules, theoretical knowledge and engineering pivoted around the regularization approach, and a technology regime around this approach emerged. The regularization regime further developed in the 20th century, and handbooks were increasingly shaped by mathematical and physical reasoning and formulas. On the other hand, coastal management was until the 1880s a rather marginal activity. Coastal engineering was an extremely complex and multidimensional field of knowledge which no engineer was able to grasp. The foundation of a Dutch weather institute was a first important step towards a more theoretical approach. The Zuiderzee works (starting in 1925) gave probably the most important stimuli to scientific coastal research. It was also a main factor in setting up scientific institutes by Rijkswaterstaat. So from the 1920s, Rijkswaterstaat became a major producer of scientific knowledge, not only in tidal modelling but also in coastal research. Due to a multidisciplinary knowledge network, coastal research transformed from a marginal to a first-rank scientific field, and this transformation enabled Rijkswaterstaat to set a much higher level of ambition in coastal management. The 1953 flood and the Deltaworks marked a new era. New design rules for sea dykes and river levees, based on a revolutionary statistical risk approach were determined, and design rules for the Deltaworks estuary closures were developed, being enabled by the development of hydraulic research.
Microgravity protein crystallization
McPherson, Alexander; DeLucas, Lawrence James
2015-01-01
Over the past 20 years a variety of technological advances in X-ray crystallography have shortened the time required to determine the structures of large macromolecules (i.e., proteins and nucleic acids) from several years to several weeks or days. However, one of the remaining challenges is the ability to produce diffraction-quality crystals suitable for a detailed structural analysis. Although the development of automated crystallization systems combined with protein engineering (site-directed mutagenesis to enhance protein solubility and crystallization) have improved crystallization success rates, there remain hundreds of proteins that either cannot be crystallized or yield crystals of insufficient quality to support X-ray structure determination. In an attempt to address this bottleneck, an international group of scientists has explored use of a microgravity environment to crystallize macromolecules. This paper summarizes the history of this international initiative along with a description of some of the flight hardware systems and crystallization results. PMID:28725714
Growth and applications of GeSn-related group-IV semiconductor materials
Zaima, Shigeaki; Nakatsuka, Osamu; Taoka, Noriyuki; Kurosawa, Masashi; Takeuchi, Wakana; Sakashita, Mitsuo
2015-01-01
We review the technology of Ge1−xSnx-related group-IV semiconductor materials for developing Si-based nanoelectronics. Ge1−xSnx-related materials provide novel engineering of the crystal growth, strain structure, and energy band alignment for realising various applications not only in electronics, but also in optoelectronics. We introduce our recent achievements in the crystal growth of Ge1−xSnx-related material thin films and the studies of the electronic properties of thin films, metals/Ge1−xSnx, and insulators/Ge1−xSnx interfaces. We also review recent studies related to the crystal growth, energy band engineering, and device applications of Ge1−xSnx-related materials, as well as the reported performances of electronic devices using Ge1−xSnx related materials. PMID:27877818
Growth and applications of GeSn-related group-IV semiconductor materials.
Zaima, Shigeaki; Nakatsuka, Osamu; Taoka, Noriyuki; Kurosawa, Masashi; Takeuchi, Wakana; Sakashita, Mitsuo
2015-08-01
We review the technology of Ge 1- x Sn x -related group-IV semiconductor materials for developing Si-based nanoelectronics. Ge 1- x Sn x -related materials provide novel engineering of the crystal growth, strain structure, and energy band alignment for realising various applications not only in electronics, but also in optoelectronics. We introduce our recent achievements in the crystal growth of Ge 1- x Sn x -related material thin films and the studies of the electronic properties of thin films, metals/Ge 1- x Sn x , and insulators/Ge 1- x Sn x interfaces. We also review recent studies related to the crystal growth, energy band engineering, and device applications of Ge 1- x Sn x -related materials, as well as the reported performances of electronic devices using Ge 1- x Sn x related materials.
Crystallization in high level waste (HLW) glass melters: Savannah River Site operational experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Kevin M.; Peeler, David K.; Kruger, Albert A.
2015-06-12
This paper provides a review of the scaled melter testing that was completed for design input to the Defense Waste Processing Facility (DWPF) melter. Testing with prototype melters provided the data to define the DWPF operating limits to avoid bulk (volume) crystallization in the un-agitated DWPF melter and provided the data to distinguish between spinels generated by refractory corrosion versus spinels that precipitated from the HLW glass melt pool. A review of the crystallization observed with the prototype melters and the full-scale DWPF melters (DWPF Melter 1 and DWPF Melter 2) is included. Examples of actual DWPF melter attainment withmore » Melter 2 are given. The intent is to provide an overview of lessons learned, including some example data, that can be used to advance the development and implementation of an empirical model and operating limit for crystal accumulation for a waste treatment and immobilization plant.« less
Fabrication of self-rolling geodesic objects and photonic crystal tubes
NASA Astrophysics Data System (ADS)
Danescu, A.; Regreny, Ph; Cremillieu, P.; Leclercq, J.-L.
2018-07-01
This paper presents a stress engineering method that allows the design and fabrication of the analogs of single-wall nanotubes in the class of photonic crystals. The macroscopic shape of the final object is obtained through the stress relaxation of a pre-stressed multilayer planar design. We illustrate the extent of the proposed method by various single-layer and multilayer photonic crystals tubes and micron-scale objects with 5-fold symmetry.
Fabrication of self-rolling geodesic objects and photonic crystal tubes.
Danescu, A; Regreny, Ph; Cremillieu, P; Leclercq, J-L
2018-07-13
This paper presents a stress engineering method that allows the design and fabrication of the analogs of single-wall nanotubes in the class of photonic crystals. The macroscopic shape of the final object is obtained through the stress relaxation of a pre-stressed multilayer planar design. We illustrate the extent of the proposed method by various single-layer and multilayer photonic crystals tubes and micron-scale objects with 5-fold symmetry.
Field and flume investigations of the effects of logjams and woody debris on streambed morphology
NASA Astrophysics Data System (ADS)
Leung, V.; Montgomery, D. R.; McHenry, M. L.
2014-12-01
Interactions among wood debris, fluid flow and sediment transport in rivers are first-order controls on channel morphodynamics, affecting streambed morphology, sediment transport, sediment storage and aquatic habitat. Woody debris increases the hydraulic and topographic complexity in rivers, leading to a greater diversity of aquatic habitats and an increase in the number of large pools that are important fish habitat and breeding grounds. In the past decade, engineered logjams have become an increasingly used tool in river management for simultaneously decreasing the rate of riverbank migration and improving aquatic habitat. Sediment deposits around woody debris build up riverbanks and counteract bank migration caused by erosion. Previous experiments on flow visualization around model woody debris suggest the amount of sediment scour and deposition are primarily related to the presence of roots and the obstructional area of the woody debris. We present the results of fieldwork and sediment transport experiments of streambed morphology around stationary woody debris. Field surveys on the Hoh River and the Elwha River, WA, measure the local streambed morphology around logjams and individual pieces of woody debris. We quantified the amount of local scour and dam-removal related fine sediment deposition around natural and engineered logjams of varying sizes and construction styles, located in different geomorphic settings. We also quantified the amount of local scour around individual pieces of woody debris of varying sizes, geometries and orientations relative to flow. The flume experiments tested the effects of root geometry and log orientation of individual stationary trees on streambed morphology. The flume contained a deformable sediment bed of medium sand. We find that: 1) the presence of roots on woody debris leads to greater areas of both sediment scour and deposition; and 2) the amount of sediment scour and deposition are related to the wood debris cross-sectional area, oriented orthogonal to flow. A better understanding of the underlying sediment physics and hydraulics around naturally occurring woody debris in rivers can provide guidance and criteria for use in river restoration and engineering as well as scientific insights into a complex interdisciplinary problem.
A Novel Mach-Zehnder Interferometer Based on Hybrid Liquid Crystal-Photonic Crystal Fiber
NASA Astrophysics Data System (ADS)
Luo, Xian-Ping; Wang, Fei-Ru; Chen, Chun-Lei; Zhang, Ling-Li; Wang, Lei; Sun, Wei-Min; Liu, Yong-Jun
2017-12-01
Not Available Supported by the National Natural Science Foundation of China under Grant Nos U1531102, 61107059, 61308052 and U1331114, the 111 Project to the Harbin Engineering University under Grant No B13015, and the Fundamental Research Funds for the Central Universities.
NASA Astrophysics Data System (ADS)
Nittrouer, Jeffrey
2016-04-01
Owing to their extraordinary natural resources and ecosystem services, deltaic coastlines host hundreds of millions of people worldwide. Societal sustainability on these coastal landscapes is far from certain, however, due to anthropogenic influences including sediment-supply reduction, accelerated subsidence from sub-surface fluid extraction, and leveeing of rivers. The crucial resource in building stable deltaic coastlines is sediment, and the key control on sediment delivery, whether natural or engineered, is by way river channel diversions. Two case studies, based on previous and ongoing research efforts, are presented here to describe the effects of engineered diversions for the removal of river water and associated sediment: the Mississippi River (U.S.A) and the Yellow River (China). Comparatively speaking, these two systems are end-members: Mississippi River water discharge is five times greater than the Yellow River, and yet historically, the Yellow River sediment discharges five times more sediment than the Mississippi system. As such, diversions for the two systems have contrasting goals. During flood events, the Mississippi water stage threatens major metropolitan regions with levee overtopping; spillways are therefore utilized to reduce water flux through the main channel. For the Yellow River, extremely high sediment loads result in significant sedimentation within the main channel, and so there is a concerted effort to divert and shorten the main channel, in order to enhance the water surface slope and increase sediment transport capacity. Interestingly, the net effect of these two projects has been to deposit a significant amount of sediment into the respective receiving basins, which in turn has led to the development of subaerial land. In essence, this represents two compelling case studies documenting how managed (engineered) land building practices can be implemented for other large fluvial-deltaic systems. Observational data collected from field studies of both the Mississippi and Yellow rivers have been used to inform and validate numerical modeling efforts that seek to replicate the morphodynamics of the two diversions. The aim is to evaluate best practices for building deltaic landscape. Based on these research efforts, there are key similarities found for the delta systems: 1) coarse (sandy) sediment is the primary contributor to subaerial delta development, despite the abundance of mud for both rivers; 2) the influx of freshwater into estuarine regions of deltas has tremendous impact on vegetation development, and therefore the cohesion of the deltaic sediment deposit; and 3) it is feasible to produce efficient diversions that maximize sediment delivery and still provide for continued use of the riverine resource (for example, navigation of the channel by vessels). These findings are critical when considering future plans that seek sustainable management practices of other large, anthropic fluvial deltaic systems.
Invisible defects in complex crystals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Longhi, Stefano, E-mail: stefano.longhi@fisi.polimi.it; Della Valle, Giuseppe
2013-07-15
We show that invisible localized defects, i.e. defects that cannot be detected by an outside observer, can be realized in a crystal with an engineered imaginary potential at the defect site. The invisible defects are synthesized by means of supersymmetric (Darboux) transformations of an ordinary crystal using band-edge wavefunctions to construct the superpotential. The complex crystal has an entire real-valued energy spectrum and Bragg scattering is not influenced by the defects. An example of complex crystal synthesis is presented for the Mathieu potential. -- Highlights: •We show the existence of invisible localized defects in complex crystals. •They turn out tomore » be fully invisible to Bloch waves belonging to any lattice band. •An example of invisible defect is presented for a PT-symmetric Mathieu crystal.« less
NASA Astrophysics Data System (ADS)
Aronoff, H. I.; Leslie, J. J.; Mittleman, A. N.; Holt, S.
1983-11-01
This manual describes a Shared Time Engineering Program (STEP) conducted by the New England Apparel Manufacturers Association (NEAMA) headquartered in Fall River Massachusetts, and funded by the Office of Trade Adjustment Assistance of the U.S. Department of Commerce. It is addressed to industry association executives, industrial engineers and others interested in examining an innovative model of industrial engineering assistance to small plants which might be adapted to their particular needs.
Connecting large-scale coastal behaviour with coastal management of the Rhône delta
NASA Astrophysics Data System (ADS)
Sabatier, François; Samat, Olivier; Ullmann, Albin; Suanez, Serge
2009-06-01
The aim of this paper is to connect the Large Scale Coastal Behaviour (LSCB) of the Rhône delta (shoreface sediment budget, river sediment input to the beaches, climatic change) with the impact and efficiency of hard engineering coastal structures. The analysis of the 1895 to 1974 bathymetric maps as well as 2D modelling of the effect of wave blocking on longshore transport allows us to draw up a conceptual model of the LSCB of the Rhône delta. The river sand input, settled in the mouth area (prodeltaic lobe), favours the advance of adjacent beaches. There is however a very weak alongshore sand feeding of the non-adjacent beaches farther off the mouth. After a mouth shift, the prodelta is eroded by aggressive waves and the sand is moved alongshore to build spits. This conceptual model suggests that there is a "timeshift" between the input of river sediments to the sea and the build up of a beach (nonadjacent to the mouth). Nowadays, as the river channels are controlled by dykes and human interventions, a river shift is not possible. It thus appears unlikely that the river sediments can supply the beaches of the Rhône delta coast. Under these conditions, we must expect that the problems of erosion will continue at Saintes-Maries-de-la-Mer and on the Faraman shore, in areas with chronic erosion where the shoreline retreat has been partially stopped by hard engineering practices in the 1980s. Therefore, these artificially stabilised sectors remain potentially under threat because of profile steepening and downdrift erosion evidenced in this paper by bathymetric profile measurements. In the long-term (1905 to 2003), the temporal analysis of the storm surges and the sea level show very weak but reliable increasing trends. Thus, these climatic agents will be more aggressive on the beaches and on the coastal structures calling their efficiency into question. We also evidence that the hard engineering structures were built in a favourable climatic context during the 1980s meanwhile the storm surges and the sea-level rise are stronger since the 1990s. Regarding to the LSCB of the Rhône delta, and the impact of hard engineering coastal structures, we suggest that classical hard coastal protections are not the best option to protect the coast.
Lewelling, B.R.
2003-01-01
Riverine and palustrine system wetlands are a major ecological component of river basins in west-central Florida. Healthy wetlands are dependent upon the frequency and duration of periodic flooding or inundation. This report assesses the extent, area, depth, frequency, and duration of periodic flooding and the effects of potential surface-water withdrawals on the wetlands along Cypress Creek and the Peace, Alafia, North Prong Alafia, and South Prong Alafia Rivers. Results of the study were derived from step-backwater analysis performed at each of the rivers using the U.S. Army Corps of Engineers Hydrologic Engineering Center-River Analysis System (HEC-RAS) one-dimensional model. The step-backwater analysis was performed using selected daily mean discharges at the 10th, 50th, 70th, 80th, 90th, 98th, 99.5th, and 99.9th percentiles to compute extent of areal inundation, area of inundation, and hydraulic depth to assess the net reduction of areal inundation if 10 percent of the total river flow were diverted for potential withdrawals. The extent of areal inundation is determined by cross-sectional topography and the degree to which the channel is incised. Areal inundation occurs along the broad, low relief of the Cypress Creek floodplain during all selected discharge percentiles. However, areal inundation of the Peace and Alafia Rivers floodplains, which generally have deeply incised channels, occurs at or above discharges at the 80th percentile. The greatest area of inundation along the three rivers generally occurs between the 90th and 98th percentile discharges. The decrease in inundated area resulting from a potential 10-percent withdrawal in discharge ranged as follows: Cypress Creek, 22 to 395 acres (1.7 to 8.4 percent); Peace River, 17 to 1,900 acres (2.1 to 13.6 percent); Alafia River, 1 to 90 acres (1 to 19.6 percent); North Prong Alafia River, 1 to 46 acres (0.7 to 23.4 percent); and South Prong Alafia River, 1 to 75 acres (1.5 to 13.4 percent).
Groundwater controls on river channel pattern
NASA Astrophysics Data System (ADS)
Bätz, Nico; Colombini, Pauline; Cherubini, Paolo; Lane, Stuart N.
2017-04-01
Braided rivers are characterized by high rates of morphological change. However, despite the potential for frequent disturbance, vegetated patches may develop within this system and influence long-term channel dynamics and channel patterns through the "engineering effects" of vegetation. The stabilizing effect of developing vegetation on morphological change has been widely shown by flume experiments and (historic) aerial pictures analysis. Thus, there is a balance between disturbance and stabilization, mediated through vegetation, that may determine the long-term geomorphic and biogeomorphic evolution of the river. It follows that with a change in disturbance frequency relative to the rate of vegetation establishment, a systematic geomorphological shift could occur. Research has addressed how changes in disturbance frequency affect river channel pattern, but has rarely addressed the way in which the stabilizing effects of biogeomorphic succession interact with disturbance frequency to maintain a river in a more dynamic or a less dynamic state. Here, we quantify how the interplay between groundwater access, disturbance frequency and vegetation succession, drive changes in channel pattern. We studied this complex interplay on a transitional gravel-bed river system (braided, wandering, meandering) close to Geneva (Switzerland) - the Allondon River. Dendroecological analysis demonstrate that vegetation growth is driven by groundwater access. Groundwater access conditions the rate of vegetation stabilization at the sub-reach scale and, due to a reduction in flood-related disturbance frequency over the last 50 years, drives a change in channel pattern. Where groundwater is shallower, vegetation encroachment rates were high and as flood-related disturbance decreased, the river has shifted towards a meandering state. Where groundwater was deeper, vegetation growth was limited by water-access and thus vegetation encroachment rates were low. Even though there was a reduction in flood disturbance, it was still sufficient to maintain a wandering/braided state. Thus, it appears that access to groundwater can control river channel pattern through its impact upon the "engineering effects" of vegetation. The results are important for river management as they highlight the non-linearity of developing vegetation in dynamic alluvial floodplains and the importance of considering the wider environmental setting and associated feedbacks between biotic and abiotic river components in defining long-term geomorphological river response.
8. Photocopied from unnumbered photo, Nunns Station Folder, Engineering Department, ...
8. Photocopied from unnumbered photo, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. EXTERIOR VIEW. C. 1898. - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
11. Photocopied from Photo #1, Nunns Station Folder, Engineering Department, ...
11. Photocopied from Photo #1, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. 'INTERIOR NUNNS STATION.' c. 1898. - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ) COMPLETION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND ...
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND CENTRE CASTING OF CAST STEEL, MASONRY CASTING OF CAST IRON CASTING, FOR MINNEAPOLIS STEEL ARCH (4 x 5 negative) - Steel Arch Bridge, Hennepin Avenue spanning west channel of Mississippi River, Minneapolis, Hennepin County, MN
1981-08-01
approval. CARNEY M. TERZLAN, KDIBER Design Branch Engineering Division Water\\ontrol Brancr%.J Engineering Division ARAiQAST MANTESI, CHIRA Geotechnical...issued to Hayden, Harding & Buchanan, Inc. on 26 June 1981 by William E. Hodgson Jr., Colonel, Corps of Engineers. Contract No. DACW 33-80-C-0006 has been
9. EXTERIOR VIEW OF BALTIMORE FAN HOUSE LOOKING NORTHEAST The ...
9. EXTERIOR VIEW OF BALTIMORE FAN HOUSE LOOKING NORTHEAST The brick and concrete construction of the engine room, airways, and chimney are evident. The shaft housing and flywheel of the Allis- Chalmers Corliss steam engine are visible through the window of the engine room. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
76 FR 34072 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
.... 20110178, Draft EIS, NRC, FL, Generic--License Renewal of Nuclear Plants Regarding Crystal River Unit 3.... 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, Proposed 150 megawatt Solar Energy Generating..., Access, Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, St. Joe Ranger District...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal... enforcement of regulation. SUMMARY: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road....S. Army Corps of Engineers' dispersal barrier maintenance operations. During the enforcement period...
33 CFR 334.560 - Banana River at Patrick Air Force Base, Fla.; restricted area.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Banana River at Patrick Air Force Base, Fla.; restricted area. 334.560 Section 334.560 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.560 Banana...
76 FR 21633 - Disestablishing Special Anchorage Area 2; Ashley River, Charleston, SC
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
...-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey... or shapes required by Rule 30 of the Inland Navigation Rules (33 U.S.C. 2030). Ashley River Properties and the Ripley Light Yacht Club submitted a permit application to the Army Corps of Engineers to...
Code of Federal Regulations, 2010 CFR
2010-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
Code of Federal Regulations, 2011 CFR
2011-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
33 CFR 207.60 - Federal Dam, Hudson River, Troy, N.Y.; pool level.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Federal Dam, Hudson River, Troy, N.Y.; pool level. 207.60 Section 207.60 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.Y.; pool level. (a) Whenever the elevation of the pool created by the Federal dam at Troy, N.Y...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
76 FR 48070 - Regulated Navigation Area, Zidell Waterfront Property, Willamette River, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... Regulated Navigation Area (RNA) at the Zidell Waterfront Property located on the Willamette River in Portland, Oregon. This RNA is necessary to preserve the integrity of an engineered sediment cap as part of... shoreline soil in these areas. As such, this RNA is necessary to help ensure the cap is protected and will...