NASA Technical Reports Server (NTRS)
Applegate, Joseph L.
2014-01-01
This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The decision document presents the selected remedial action for Operable Unit Two (OU2) at the O-Line Ponds Area, Milan Army Ammunition Plant, Milan, Tennessee. The goal of the overall cleanup activities at the site is to prevent migration of contaminants from soil at the site and to prevent exposures to these contaminants, so that no adverse health effects will result from current or future off-post or on-post use. Soil contaminated with explosives compounds is known to exist in the O-Line Ponds area, and under current conditions, this contamination poses a potential threat to groundwater at the site. Currently contaminated groundwatermore » is being addressed by separate remedial actions under different Operable Units (OUs).« less
Comprehensive Characterization a Tidal Energy Site (Invited)
NASA Astrophysics Data System (ADS)
Polagye, B. L.; Thomson, J. M.; Bassett, C. S.; Epler, J.; Northwest National Marine Renewable Energy Center
2010-12-01
Northern Admiralty Inlet, Puget Sound, Washington is the proposed location of a pilot tidal energy project. Site-specific characterization of the physical and biological environment is required for device engineering and environmental analysis. However, the deep water and strong currents which make the site attractive for tidal energy development also pose unique challenges to collecting comprehensive information. This talk focuses on efforts to optimally site hydrokinetic turbines and estimate their acoustic impact, based on 18 months of field data collected to date. Additional characterization efforts being undertaken by the University of Washington branch of the Northwest National Marine Renewable Energy Center and its partners include marine mammal presence and behavior, water quality, seabed geology, and biofouling potential. Because kinetic power density varies with the cube of horizontal current velocity, an accurate map of spatial current variations is required to optimally site hydrokinetic turbines. Acoustic Doppler profilers deployed on the seabed show operationally meaningful variations in flow characteristics (e.g., power density, directionality, vertical shear) and tidal harmonic constituents over length scales of less than 100m. This is, in part, attributed to the proximity of this site to a headland. Because of these variations, interpolation between stationary measurement locations introduces potentially high uncertainty. The use of shipboard acoustic Doppler profilers is shown to be an effective tool for mapping peak currents and, combined with information from seabed profilers, may be able to resolve power density variations in the project area. Because noise levels from operating turbines are expected to exceed regulatory thresholds for incidental harassment of marine mammals known to be present in the project area, an estimate of the acoustic footprint is required to permit the pilot project. This requires site-specific descriptions of pre-existing ambient noise levels and the transmission loss (or practical spreading) at frequencies of interest. Recording hydrophones deployed on the seabed are used to quantify ambient noise, but are contaminated by self-noise during periods of strong currents. An empirical estimate of transmission loss is obtained from a source of opportunity - a passenger ferry which operates for more than twelve hours each day. By comparing recorded sound pressure levels against the location of the passenger ferry and other vessels (logged by an AIS receiver), the empirical transmission loss and source level for the ferry are obtained. Measurements of current velocity and underwater noise can apply routine oceanographic instruments and techniques. More unique measurements will be more challenging, such as high resolution sampling of current structure upstream and downstream of an operating device tens of meters off the seabed. Innovative approaches are required for cost effective characterization of tidal energy sites and monitoring of operating projects.
A network for continuous monitoring of water quality in the Sabine River basin, Texas and Louisiana
Blakey, J.F.; Skinner, P.W.
1973-01-01
Level I operations at a proposed site would monitor current and potential problems, water-quality changes in subreaches of streams, and water-quality trends in time and place. Level II operations would monitor current or potential problems only. An optimum system would require Level I operations at all nine stations. A minimum system would require Level II operations at most of the stations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Faybishenko, Boris; Birkholzer, Jens; Sassani, David
The overall objective of the Fifth Worldwide Review (WWR-5) is to document the current state-of-the-art of major developments in a number of nations throughout the World pursuing geological disposal programs, and to summarize challenging problems and experience that have been obtained in siting, preparing and reviewing cases for the operational and long-term safety of proposed and operating nuclear waste repositories. The scope of the Review is to address current specific technical issues and challenges in safety case development along with the interplay of technical feasibility, siting, engineering design issues, and operational and post-closure safety. In particular, the chapters included inmore » the report present the following types of information: the current status of the deep geological repository programs for high level nuclear waste and low- and intermediate level nuclear waste in each country, concepts of siting and radioactive waste and spent nuclear fuel management in different countries (with the emphasis of nuclear waste disposal under different climatic conditions and different geological formations), progress in repository site selection and site characterization, technology development, buffer/backfill materials studies and testing, support activities, programs, and projects, international cooperation, and future plans, as well as regulatory issues and transboundary problems.« less
AmeriFlux US-Ne1 Mead - irrigated continuous maize site
Suyker, Andy [University of Nebraska - Lincoln
2016-01-01
This is the AmeriFlux version of the carbon flux data for the site US-Ne1 Mead - irrigated continuous maize site. Site Description - The study site is one of three fields (all located within 1.6 km of each other) at the University of Nebraska Agricultural Research and Development Center near Mead, Nebraska. This site is irrigated with a center pivot system. Prior to the initiation of the study, the irrigated site had a 10-yr history of maize-soybean rotation under no-till. A tillage operation (disking) was done just prior to the 2001 planting to homogenize the top 0.1 m of soil, incorporate P and K fertilizers, as well as previously accumulated surface residues. Since the tillage operation, the site has been under no-till management until the harvest of 2005. Following harvest, a conservation-plow tillage operation was initiated where a small amount of N fertilizer is sprayed on the residue immediately prior to the plow operation. Approximately 1/3 of the crop residue is left on the surface. The post-harvest conservation-plow operation continues as the current practice.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Koppers Texarkana site is located within the City of Texarkana, Texas. The site consists of a 34-acre residential area and a 28-acre former sand and gravel operation. The Koppers Company operated the site as a wood-preserving facility from 1910 to 1961 using pentachlorophenol (PCP), creosote, and metallic salts in the operation. The site is currently owned by Carver Terrace, Inc. The Texas Department of Water Resources became aware of the site in 1979 through the Ekhardt Survey. The remedial investigation indicated that the highest concentration of site contaminants in the soil were located near the operations and drip trackmore » areas of the old wood-preserving facility. The primary contaminants of concern affecting the soil, ground water, and sediments are volatile organic compounds including benzene, xylenes, and toluene, other organics including polynuclear aromatic hydrocarbons and PCP, and metals including arsenic. The selected remedial action for the site is included.« less
February 2013 report on the current site conditions and a summary of human and ecological risk assessments of the LCP Chemicals Superfund Site, GA. Region ID : 04, DocID: 10925336 , DocDate: 2013-02-01
Logging utilization in Idaho: Current and past trends
Eric A. Simmons; Todd A. Morgan; Erik C. Berg; Stanley J. Zarnoch; Steven W. Hayes; Mike T. Thompson
2014-01-01
A study of commercial timber-harvesting activities in Idaho was conducted during 2008 and 2011 to characterize current tree utilization, logging operations, and changes from previous Idaho logging utilization studies. A two-stage simple random sampling design was used to select sites and felled trees for measurement within active logging sites. Thirty-three logging...
The Thirty Meter Telescope Site Testing Robotic Computer System
NASA Astrophysics Data System (ADS)
Riddle, Reed L.; Schöck, M.; Skidmore, W.; Els, S.; Travouillon, T.
2008-03-01
The Thirty Meter Telescope (TMT) project is currently testing five remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote, they require a control system that can automatically manage the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This is a discussion of the TMT site testing robotic computer system as implemented.
LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ocampo, R. P.; Bellah, W.
The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well watermore » is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ocampo, Ruben P.; Bellah, Wendy
The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well watermore » is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.« less
Effect of forced-air warming on the performance of operating theatre laminar flow ventilation.
Dasari, K B; Albrecht, M; Harper, M
2012-03-01
Forced-air warming exhaust may disrupt operating theatre airflows via formation of convection currents, which depends upon differences in exhaust and operating room air temperatures. We investigated whether the floor-to-ceiling temperatures around a draped manikin in a laminar-flow theatre differed when using three types of warming devices: a forced-air warming blanket (Bair Hugger™); an over-body conductive blanket (Hot Dog™); and an under-body resistive mattress (Inditherm™). With forced-air warming, mean (SD) temperatures were significantly elevated over the surgical site vs those measured with the conductive blanket (+2.73 (0.7) °C; p<0.001) or resistive mattress (+3.63 (0.7) °C; p<0.001). Air temperature differences were insignificant between devices at floor (p=0.339), knee (p=0.799) and head height levels (p=0.573). We conclude that forced-air warming generates convection current activity in the vicinity of the surgical site. The clinical concern is that these currents may disrupt ventilation airflows intended to clear airborne contaminants from the surgical site. Anaesthesia © 2012 The Association of Anaesthetists of Great Britain and Ireland.
The Thirty Meter Telescope site testing robotic computer system
NASA Astrophysics Data System (ADS)
Riddle, Reed L.; Schöck, Matthias; Skidmore, Warren
2006-06-01
The Thirty Meter Telescope (TMT) project is currently testing six remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote (usually hours from the nearest town), they requires a system that can control the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This paper is a discussion of the TMT site testing robotic computer system as implemented.
Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyle, J.W.; Blumberg, R.; Cotter, S.J.
1982-11-01
An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily withmore » the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn
Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).« less
Environmental impact statement Space Shuttle advanced solid rocket motor program
NASA Technical Reports Server (NTRS)
1989-01-01
The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site. Sites being considered for the new facilities include John C. Stennis Space Center, Hancock County, Mississippi; the Yellow Creek site in Tishomingo County, Mississippi, which is currently in the custody and control of the Tennessee Valley Authority; and John F. Kennedy Space Center, Brevard County, Florida. TVA proposes to transfer its site to the custody and control of NASA if it is the selected site. All facilities need not be located at the same site. Existing facilities which may provide support for the program include Michoud Assembly Facility, New Orleans Parish, Louisiana; and Slidell Computer Center, St. Tammany Parish, Louisiana. NASA's preferred production location is the Yellow Creek site, and the preferred test location is the Stennis Space Center.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie
2003-09-01
Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie
2004-09-01
Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).« less
Site remediation techniques in India: a review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anomitra Banerjee; Miller Jothi
India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelandsmore » arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)« less
Prevention of 3 "never events" in the operating room: fires, gossypiboma, and wrong-site surgery.
Zahiri, Hamid R; Stromberg, Jeffrey; Skupsky, Hadas; Knepp, Erin K; Folstein, Matthew; Silverman, Ronald; Singh, Devinder
2011-03-01
This study sought to identify and provide preventative recommendations for potentially devastating safety violations in the operating room. A Medline database search from 1950 to current using the terms patient safety and operating room was conducted. All topics identified were reviewed. Three patient safety violations with potential for immediate and devastating outcomes were selected for discussion using evidence-based literature. The search identified 2851 articles, 807 of which were directly related to patient safety in the operating room. Topics addressed by these 807 included infectious complications (26%), fires (11%), communication/teamwork (6%), retained foreign objects (3%), safety checklists (1%), and wrong-site surgery (1%). Fires, gossypiboma, and wrong-site surgery were selected for discussion. Although fire, gossypiboma, and wrong-site surgery should be "never events" in the operating room, they continue to persist as 3 common patient safety violations. This study provides the epidemiology, common etiologies, and evidence-based preventative recommendations for each.
Yassa, Rafik Rd; Khalfaoui, Mahdi Y; Veravalli, Karunakar; Evans, D Alun
2017-03-01
The aims of the current study were to determine whether pre-operative urinary tract infections in patients presenting acutely with neck of femur fractures resulted in a delay to surgery and whether such patients were at increased risk of developing post-operative surgical site infections. A retrospective review of all patients presenting with a neck of femur fracture, at a single centre over a one-year period. The hospital hip fracture database was used as the main source of data. UK University Teaching Hospital. All patients ( n = 460) presenting across a single year study period with a confirmed hip fracture. The presence of pre-operative urinary tract infection, the timing of surgical intervention, the occurrence of post-operative surgical site infection and the pathogens identified. A total of 367 patients were operated upon within 24 hours of admission. Urinary infections were the least common cause of delay. A total of 99 patients (21.5%) had pre-operative urinary tract infection. Post-operatively, a total of 57 (12.4%) patients developed a surgical site infection. Among the latter, 31 (54.4%) did not have a pre-operative urinary infection, 23 (40.4%) patients had a pre-operative urinary tract infection, 2 had chronic leg ulcers and one patient had a pre-operative chest infection. Statistically, there was a strong relationship between pre-operative urinary tract infection and the development of post-operative surgical site infection ( p -value: 0.0005). The results of our study indicate that pre-operative urinary tract infection has a high prevalence amongst those presenting with neck of femur fractures, and this is a risk factor for the later development of post-operative surgical site infection.
NASA Technical Reports Server (NTRS)
Johnson, Dale L.; Vaughan, William W.
1998-01-01
A summary is presented of basic lightning characteristics/criteria for current and future NASA aerospace vehicles. The paper estimates the probability of occurrence of a 200 kA peak lightning return current, should lightning strike an aerospace vehicle in various operational phases, i.e., roll-out, on-pad, launch, reenter/land, and return-to-launch site. A literature search was conducted for previous work concerning occurrence and measurement of peak lighting currents, modeling, and estimating probabilities of launch vehicles/objects being struck by lightning. This paper presents these results.
NASA Astrophysics Data System (ADS)
Fergason, R. L.; Laura, J.; Hare, T. M.; Otero, R.; Edgar, L. A.
2017-12-01
A Spatial Data Infrastructure (SDI) is a robust framework for data and data products, metadata, data access mechanisms, standards, policy, and a user community that helps to define and standardize the data necessary to meet some specified goal. The primary objective of an SDI is to improve communication, to enhance data access, and to aid in identifying gaps in knowledge. We are developing an SDI that describes the foundational data sets and accuracy requirements to evaluate landing site safety, facilitate the successful operation of Terrain Relative Navigation (TRN), and assist in the operation of the rover once it has successfully landed on Mars. Thru current development efforts, an implicit SDI exists for the Mars 2020 mission. An explicit SDI will allow us to identify any potential gaps in knowledge, facilitate communication between the different institutions involved in landing site evaluation and TRN development, and help ensure a smooth transition from landing to surface operations. This SDI is currently relevant to the Mars 2020 rover mission, but can also serve as a means to document current requirements for foundational data products and standards for future landed missions to Mars and other planetary bodies. To generate a Mars 2020-specific SDI, we must first document and rationalize data set and accuracy requirements for evaluating landing sites, performing surface operations, and inventorying Mars 2020 mission needs in terms of an SDI framework. This step will allow us to 1) evaluate and define what is needed for the acquisition of data and the generation and validation of data products, 2) articulate the accuracy and co-registration requirements, and 3) identify needs for data access (and eventual archiving). This SDI document will serve as a means to communicate the existing foundational products, standards that were followed in producing these products, and where and how these products can be accessed by the planetary community. This SDI will also facilitate discussions between the landing and surface operations groups to communicate the available data and identify unique needs to surface operations. Our goal is to continually review and update this SDI throughout the Mars 2020 landing site evaluation and operations, so that it remains relevant and effective as data availability and needs evolve.
Verbal autopsy: current practices and challenges.
Soleman, Nadia; Chandramohan, Daniel; Shibuya, Kenji
2006-01-01
Cause-of-death data derived from verbal autopsy (VA) are increasingly used for health planning, priority setting, monitoring and evaluation in countries with incomplete or no vital registration systems. In some regions of the world it is the only method available to obtain estimates on the distribution of causes of death. Currently, the VA method is routinely used at over 35 sites, mainly in Africa and Asia. In this paper, we present an overview of the VA process and the results of a review of VA tools and operating procedures used at demographic surveillance sites and sample vital registration systems. We asked for information from 36 field sites about field-operating procedures and reviewed 18 verbal autopsy questionnaires and 10 cause-of-death lists used in 13 countries. The format and content of VA questionnaires, field-operating procedures, cause-of-death lists and the procedures to derive causes of death from VA process varied substantially among sites. We discuss the consequences of using varied methods and conclude that the VA tools and procedures must be standardized and reliable in order to make accurate national and international comparisons of VA data. We also highlight further steps needed in the development of a standard VA process. PMID:16583084
32 CFR 179.2 - Applicability and scope.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) § 179.2 Applicability and scope. (a) This part... ordnance (UXO), discarded military munitions (DMM), or munitions constituents (MC), and (3) That are... munitions results from combat operations, (5) Currently operating military munitions storage and...
32 CFR 179.2 - Applicability and scope.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) § 179.2 Applicability and scope. (a) This part... ordnance (UXO), discarded military munitions (DMM), or munitions constituents (MC), and (3) That are... munitions results from combat operations, (5) Currently operating military munitions storage and...
32 CFR 179.2 - Applicability and scope.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) § 179.2 Applicability and scope. (a) This part... ordnance (UXO), discarded military munitions (DMM), or munitions constituents (MC), and (3) That are... munitions results from combat operations, (5) Currently operating military munitions storage and...
32 CFR 179.2 - Applicability and scope.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) § 179.2 Applicability and scope. (a) This part... ordnance (UXO), discarded military munitions (DMM), or munitions constituents (MC), and (3) That are... munitions results from combat operations, (5) Currently operating military munitions storage and...
32 CFR 179.2 - Applicability and scope.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) § 179.2 Applicability and scope. (a) This part... ordnance (UXO), discarded military munitions (DMM), or munitions constituents (MC), and (3) That are... munitions results from combat operations, (5) Currently operating military munitions storage and...
Virtual Planetary Analysis Environment for Remote Science
NASA Technical Reports Server (NTRS)
Keely, Leslie; Beyer, Ross; Edwards. Laurence; Lees, David
2009-01-01
All of the data for NASA's current planetary missions and most data for field experiments are collected via orbiting spacecraft, aircraft, and robotic explorers. Mission scientists are unable to employ traditional field methods when operating remotely. We have developed a virtual exploration tool for remote sites with data analysis capabilities that extend human perception quantitatively and qualitatively. Scientists and mission engineers can use it to explore a realistic representation of a remote site. It also provides software tools to "touch" and "measure" remote sites with an immediacy that boosts scientific productivity and is essential for mission operations.
7 CFR 3560.303 - Housing project budgets.
Code of Federal Regulations, 2014 CFR
2014-01-01
... history, current circumstances, and market conditions. (3) Borrowers must document that the operating expenses included in the budget accurately reflect reasonable and necessary costs to operate the housing... personnel costs of permanent and part-time staff assigned directly to the project site. This includes...
Differences Between S/X and VLBI2010 Operation
NASA Technical Reports Server (NTRS)
Hase, Hayo; Himwich, Ed; Neidhardt, Alexander
2010-01-01
The intended VLBI2010 operation has some significant differences to the current S/X operation. The presentation focuses on the problem of extending the operation of a global VLBI network to continuous operation within the frame of the same given amount of human resources. Remote control operation is a suitable solution to minimize operational expenses. The implementation of remote control operation requires more site specific information. A concept of a distributed-centralized remote control of the operation and its implications is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
This Decision Document presents the selected remedial action for the Peterson/Puritan, Inc. Superfund Site, Operable Unit 1, in Cumberland and Lincoln, Rhode Island. Operable Unit 1 contains two remediation areas. The CCL remediation area, a source of volatile organic contamination, includes the former Peterson/Puritan, Inc. facility, which is the Site's namesake (currently the CCL Custom Manufacturing facility, and referred to as CCL). The PAC remediation area includes the Pacific Anchor Chemical Corporation (PAC ) facility (formerly the Lonza and Universal Chemical Company facility), which is a source of arsenic and volatile organic contamination. Each remediation area is further split intomore » source and downgradient area components, respectively.« less
Modeling Natural Attenuation of an Industrial Facility in Houston
NASA Astrophysics Data System (ADS)
Sun, D.
2016-12-01
Groundwater monitoring is currently ongoing at a commercial/industrial facility located in Deer Park, Texas (the site). The subject site is an approximate 10 acre commercial/industrial facility that began operation in the late-1970s. Operations have historically consisted of vehicle maintenance services, administrative, and equipment storage. Assessment and groundwater monitoring activities have been conducted at the site to evaluate the magnitude and extent of groundwater affected with chlorinated volatile organic compounds (VOCs). Groundwater data has been collected at this site since the mid-2000s on a quarterly basis. Presently, VOC constituents tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (DCE), 1,1-dichloroethene (1,1-DCE), and vinyl chloride (VC) are the only chemicals of concern (COCs) detected at concentrations exceeding the TCEQ Actions Levels established by the state of Texas. The goal is that one day the site will receive a certificate of completion from the state, which states that all non-responsible parties are released from all liability to the state for cleanup. The remediation technology that is currently being used at this site is Monitoring Natural Attenuation (MNA). A significant question is whether MNA is efficiently removing COCs in groundwater and how long will this process take to achieve the remediation goals. The objective of this study is to provide an estimate of concentrations of COCs in groundwater at the site using the Biochlor model. The Biochlor model will help answer the question as to whether or not natural attenuation is occurring at the site efficiently. Results show that Monitored Natural Attenuation may not be the optimal remediation technology to use at this site. Other remedial technologies are needed to clean up chemical in the site. Groundwater monitoring is currently ongoing at a commercial/industrial facility located in Deer Park, Texas (the site). The subject site is an approximate 10 acre commercial/industrial facility that began operation in the late-1970s. Operations have historically consisted of vehicle maintenance services, administrative, and equipment storage. Assessment and groundwater monitoring activities have been conducted at the site to evaluate the magnitude and extent of groundwater affected with chlorinated volatile organic compounds (VOCs). Groundwater data has been collected at this site since the mid-2000s on a quarterly basis. Presently, VOC constituents tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (DCE), 1,1-dichloroethene (1,1-DCE), and vinyl chloride (VC) are the only chemicals of concern (COCs) detected at concentrations exceeding the TCEQ Actions Levels established by the state of Texas. The goal is that one day the site will receive a certificate of completion from the state, which states that all non-responsible parties are released from all liability to the state for cleanup. The remediation technology that is currently being used at this site is Monitoring Natural Attenuation (MNA). A significant question is whether MNA is efficiently removing COCs in groundwater and how long will this process take to achieve the remediation goals. The objective of this study is to provide an estimate of concentrations of COCs in groundwater at the site using the Biochlor model. The Biochlor model will help answer the question as to whether or not natural attenuation is occurring at the site efficiently. Results show that Monitored Natural Attenuation may not be the optimal remediation technology to use at this site. Other remedial technologies are needed to clean up chemical in the site.
Lightning Strike Peak Current Probabilities as Related to Space Shuttle Operations
NASA Technical Reports Server (NTRS)
Johnson, Dale L.; Vaughan, William W.
2000-01-01
A summary is presented of basic lightning characteristics/criteria applicable to current and future aerospace vehicles. The paper provides estimates on the probability of occurrence of a 200 kA peak lightning return current, should lightning strike an aerospace vehicle in various operational phases, i.e., roll-out, on-pad, launch, reenter/land, and return-to-launch site. A literature search was conducted for previous work concerning occurrence and measurement of peak lighting currents, modeling, and estimating the probabilities of launch vehicles/objects being struck by lightning. This paper presents a summary of these results.
National High Frequency Radar Network (hfrnet) and Pacific Research Efforts
NASA Astrophysics Data System (ADS)
Hazard, L.; Terrill, E. J.; Cook, T.; de Paolo, T.; Otero, M. P.; Rogowski, P.; Schramek, T. A.
2016-12-01
The U.S. High Frequency Radar Network (HFRNet) has been in operation for over ten years with representation from 31 organizations spanning academic institutions, state and local government agencies, and private organizations. HFRNet currently holds a collection from over 130 radar installations totaling over 10 million records of surface ocean velocity measurements. HFRNet is a primary example of inter-agency and inter-institutional partnerships for improving oceanographic research and operations. HF radar derived surface currents have been used in several societal applications including coastal search and rescue, oil spill response, water quality monitoring and marine navigation. Central to the operational success of the large scale network is an efficient data management, storage, access, and delivery system. The networking of surface current mapping systems is characterized by a tiered structure that extends from the individual field installations to local regional operations maintaining multiple sites and on to centralized locations aggregating data from all regions. The data system development effort focuses on building robust data communications from remote field locations (sites) for ingestion into the data system via data on-ramps (Portals or Site Aggregators) to centralized data repositories (Nodes). Centralized surface current data enables the aggregation of national surface current grids and allows for ingestion into displays, management tools, and models. The Coastal Observing Research and Development Center has been involved in international relationships and research in the Philippines, Palau, and Vietnam. CORDC extends this IT architecture of surface current mapping data systems leveraging existing developments and furthering standardization of data services for seamless integration of higher level applications. Collaborations include the Philippine Atmospheric Geophysical and Astronomical Services Administration (PAGASA), The Coral Reef Research Foundation (CRRF), and the Center for Oceanography/Vietnamese Administration of Seas and Islands (CFO/VASI). These collaborations and data sharing improve our abilities to respond to regional, national, and global environmental and management issues.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agogino, Karen; Sanchez, Rebecca
Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA), through the Sandia Site Offi ce (SSO), in Albuquerque, NM, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Washington Group International subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operatesmore » KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2007. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Site Offi ce (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting Manual (DOE 2007).« less
75 FR 22868 - Withdrawal of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... Characterization of Seismic Sources and Determination of Safe Shutdown Earthquake Ground Motion.'' FOR FURTHER.... Nuclear Regulatory Commission (NRC) is withdrawing RG 1.165, ``Identification and Characterization of... alter the licensing basis of any currently operating reactor or any of the currently issued early site...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... operate in-stream tidal turbines to power the office building and marina on site. Natural Currents Red... of the tides. The initial installations would consist of ten in-stream 20-kilowatt (kW) turbines with...
30 CFR 785.25 - Lands eligible for remining.
Code of Federal Regulations, 2010 CFR
2010-07-01
... application to conduct a surface coal mining operation on lands eligible for remining must comply with this... environmental and safety problems related to prior mining activity at the site and that could be reasonably... tailored to current site conditions. (2) With regard to potential environmental and safety problems...
1993-12-30
projectile fragments from target materials, principally sand. Phase I activities included (1) literature review of separations technology , (2) site visits, (3...the current operation, evaluation of alternative means for separation of DU from sand, a review of uranium mining technology for v possible...the current operation, evaluation of alternative means for separation of DU from sand, a review of uranium mining technology for possible
Draft environmental impact statement: Space Shuttle Advanced Solid Rocket Motor Program
NASA Technical Reports Server (NTRS)
1988-01-01
The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site.
Remote observing capability with Subaru Telescope
NASA Astrophysics Data System (ADS)
Kosugi, George; Sasaki, Toshiyuki; Yagi, Masafumi; Ogasawara, Ryusuke; Mizumoto, Yoshihiko; Noumaru, Junichi; Kawai, Jun A.; Koura, Norikazu; Kusumoto, Toyoaki; Yamamoto, Tadahiro; Watanabe, Noboru; Ukawa, Kentaro
2004-09-01
We've implemented remote observing function to Subaru telescope Observation Software system (SOSs). Subaru telescope has three observing-sites, i.e., a telescope local-site and two remote observing-sites, Hilo base facility in Hawaii and Mitaka NAOJ headquarter in Japan. Our remote observing system is designed to allow operations not only from one of three observing-sites, but also from more than two sites concurrently or simultaneously. Considering allowance for delay in observing operations and a bandwidth of the network between the telescope-site and the remote observing-sites, three types of interfaces (protocols) have been implemented. In the remote observing mode, we use socket interface for the command and the status communication, vnc for ready-made applications and pop-up windows, and ftp for the actual data transfer. All images taken at the telescope-site are transferred to both of two remote observing-sites immediately after the acquisition to enable the observers' evaluation of the data. We present the current status of remote observations with Subaru telescope.
John Rusty Dramm; Gerry L. Jackson; Jenny Wong
2002-01-01
This report provides a general overview of current log sort yard operations in the United States, including an extensive literature review and information collected during on-site visits to several operations throughout the nation. Log sort yards provide many services in marketing wood and fiber by concentrating, merchandising, processing, sorting, and adding value to...
Industrial operations and current land use.
John I. Blake; John J. Mayer; John C. Kilgo
2005-01-01
The management of natural resources at the Savannah River Site (SRS) has been variously executed over the years to meet conservation and restoration objectives, to provide research and educational opportunities, and to generate revenue from the sale of forest products. However, these management activities have been implemented under the constraints imposed by the Site...
Sitewide Environmental Assessment for the National Renewable Energy Laboratory, Golden, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-04
The Solar Energy Research, Development, and Demonstration Act of 1974 authorized a federal program to develop solar energy as a viable source of the nation`s future energy needs. Under this authority, the National Renewable Energy Laboratory (NREL) was created as a laboratory of the Department of Energy (DOE) to research a number of renewable energy possibilities. The laboratory conducts its operations both in government-owned facilities on the NREL South Table Mountain (STM) Site near Golden, Colorado, and in a number of leased facilities, particularly the Denver West Office Park. NREL operations include research in energy technologies, and other areas ofmore » national environmental and energy technology interest. Examples of these technologies include electricity from sunlight with solar cells (photovoltaics); energy from wind (windmills or wind turbines); conversion of plants and plant products (biomass) into liquid fuels (ethanol and methanol); heat from the sun (solar thermal) in place of wood, oil, gas, coal and other forms of heating; and solar buildings. NREL proposes to continue and expand the present R&D efforts in C&R energy by making infrastructure improvements and constructing facilities to eventually consolidate the R&D and associated support activities at its STM Site. In addition, it is proposed that operations continue in current leased space at the present levels of activity until site development is complete. The construction schedule proposed is designed to develop the site as rapidly as possible, dependent on Congressional funding, to accommodate not only the existing R&D that is being conducted in leased facilities off-site but to also allow for the 20-year projected growth. Impacts from operations currently conducted off-site are quantified and added to the cumulative impacts of the STM site. This environmental assessment provides information to determine the severity of impacts on the environment from the proposed action.« less
Site Selection for Hvdc Ground Electrodes
NASA Astrophysics Data System (ADS)
Freire, P. F.; Pereira, S. Y.
2014-12-01
High-Voltage Direct Current (HVDC) transmission systems are composed of a bipole transmission line with a converter substation at each end. Each substation may be equipped with a HVDC ground electrode, which is a wide area (up to 1 km Ø) and deep (from 3 to 100m) electrical grounding. When in normal operation, the ground electrode will dissipate in the soil the unbalance of the bipole (~1.5% of the rated current). When in monopolar operation with ground return, the HVDC electrode will inject in the soil the nominal pole continuous current, of about 2000 to 3000 Amperes, continuously for a period up to a few hours. HVDC ground electrodes site selection is a work based on extensive geophysical and geological surveys, in order to attend the desired design requirements established for the electrodes, considering both its operational conditions (maximum soil temperature, working life, local soil voltage gradients etc.) and the interference effects on the installations located up to 50 km away. This poster presents the geophysical investigations conducted primarily for the electrodes site selection, and subsequently for the development of the crust resistivity model, which will be used for the interference studies. A preliminary site selection is conducted, based on general geographical and geological criteria. Subsequently, the geology of each chosen area is surveyed in detail, by means of electromagnetic/electrical geophysical techniques, such as magnetotelluric (deep), TDEM (near-surface) and electroresistivity (shallow). Other complementary geologic and geotechnical surveys are conducted, such as wells drilling (for geotechnical characterization, measurement of the water table depth and water flow, and electromagnetic profiling), and soil and water sampling (for measurement of thermal parameters and evaluation of electrosmosis risk). The site evaluation is a dynamic process along the surveys, and some sites will be discarded. For the two or three final sites, the inversion of the combined deep, near-surface and shallow apparent resistivity curves, results in the layered crust resistivity models. These models will allow for the preliminary interference studies, that will result on the selection of the final electrode site (one for each converter substation).
On-site or off-site treatment of medical waste: a challenge
2014-01-01
Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, compare on-site medical waste treatment facilities with off-site systems and find the best location of medical waste treatment. To assess the current on-site facilities, four provinces (and 40 active hospitals) were selected to participate in the survey. For comparison of on-site and off-site facilities (due to non availability of an installed off-site facility) Analytical Hierarchy Process (AHP) was employed. The result indicated that most on-site medical waste treating systems have problems in financing, planning, determining capacity of installations, operation and maintenance. AHP synthesis (with inconsistency ratio of 0.01 < 0.1) revealed that, in total, the off-site treatment of medical waste was in much higher priority than the on-site treatment (64.1% versus 35.9%). According to the results of study it was concluded that the off-site central treatment can be considered as an alternative. An amendment could be made to Iran’s current medical waste regulations to have infectious-hazardous waste sent to a central off-site installation for treatment. To begin and test this plan and also receive the official approval, a central off-site can be put into practice, at least as a pilot in one province. Next, if it was practically successful, it could be expanded to other provinces and cities. PMID:24739145
Aerosol Measurements by the Globally Distributed Micro Pulse Lidar Network
NASA Technical Reports Server (NTRS)
Spinhirne, James; Welton, Judd; Campbell, James; Berkoff, Tim; Starr, David (Technical Monitor)
2001-01-01
Full time measurements of the vertical distribution of aerosol are now being acquired at a number of globally distributed MP (micro pulse) lidar sites. The MP lidar systems provide full time profiling of all significant cloud and aerosol to the limit of signal attenuation from compact, eye safe instruments. There are currently eight sites in operation and over a dozen planned. At all sited there are also passive aerosol and radiation measurements supporting the lidar data. Four of the installations are at Atmospheric Radiation Measurement program sites. The network operation includes instrument operation and calibration and the processing of aerosol measurements with standard retrievals and data products from the network sites. Data products include optical thickness and extinction cross section profiles. Application of data is to supplement satellite aerosol measurements and to provide a climatology of the height distribution of aerosol. The height distribution of aerosol is important for aerosol transport and the direct scattering and absorption of shortwave radiation in the atmosphere. Current satellite and other data already provide a great amount of information on aerosol distribution, but no passive technique can adequately resolve the height profile of aerosol. The Geoscience Laser Altimeter System (GLAS) is an orbital lidar to be launched in early 2002. GLAS will provide global measurements of the height distribution of aerosol. The MP lidar network will provide ground truth and analysis support for GLAS and other NASA Earth Observing System data. The instruments, sites, calibration procedures and standard data product algorithms for the MPL network will be described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stein, Joshua; Burnham, Laurie; Jones, Christian Birk
The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlinesmore » tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.« less
NASA Technical Reports Server (NTRS)
Tellado, Joseph
2014-01-01
The presentation contains a status of KSC ISS Logistics Operations. It basically presents current top level ISS Logistics tasks being conducted at KSC, current International Partner activities, hardware processing flow focussing on late Stow operations, list of KSC Logistics POC's, and a backup list of Logistics launch site services. This presentation is being given at the annual International Space Station (ISS) Multi-lateral Logistics Maintenance Control Panel meeting to be held in Turin, Italy during the week of May 13-16. The presentatiuon content doesn't contain any potential lessons learned.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-05-09
The Cimarron Mining Corporation, an Update 7 National Priorities List site, is located in the southeastern section of Carrizozo, Lincoln County, New Mexico. From 1979 to 1982 the site was operated as a milling operation where precious metals were extracted from crushed iron ore by using either sodium cyanide or potassium cyanide mixed with a metal stripper in a leaching process. Currently the site is inactive; however, drums of sodium/potassium cyanide and solid metal stripping and recovery compounds remain on-site. Preliminary environmental monitoring data indicate chromium, cyanide, lead, and nitrate contamination of on-site groundwater, and cyanide contamination of on-site soil,more » tailings, and wastes. The most likely pathways for contaminant transport to off-site areas appear to be those associated with groundwater and soil. Pathways for human exposure to site-associated contaminants include ingestion of contaminated groundwater and soil and inhalation of contaminated dusts. The site is of potential public health concern because of possible human exposure to site contaminants.« less
French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guiberteau, Ph.; Nokhamzon, J.G.
Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future.more » Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA comes from the diversity of facilities to be dismantled, which are predominantly research facilities and therefore have no series advantage. There is tremendous operating feedback, however. For more than twenty years in all its centres, the CEA has acquired experience and know-how through dismantling research reactors or critical models and laboratories or plants. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing from two dedicated funds, close to euro 15,000 Millions for the next thirty years, for current or projected dismantling operations, the Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2020, the dismantling of the UP1 plant at Marcoule, one of the largest dismantling works in the world, will be well advanced, with all the process equipment dismantled. (authors)« less
Site scientific mission plan for the Southern Great Plains CART site, January-June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.
1994-12-01
The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less
Performance assessment for low-level waste disposal in the UK
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashworth, A.B.
1995-12-31
British Nuclear Fuels plc (BNFL) operate a site for the disposal of Low Level Radioactive Waste at Drigg in West Cumbria, in North-West England. HMIP are responsible for the regulation of the site with regard to environmental discharges of radioactive materials, both operational and post-closure. This paper is concerned with post-closure matters only. Two post-closure performance assessments have been carried out for this site: one by the National Radiological Protection Board (NRPB) in 1987; and a subsequent one carried out on behalf of HMIP, completed in 1991. Currently, BNFL are preparing a Safety Case for continued operation of the Driggmore » site, and it expected that the core of this Case will comprise BNFL`s own analysis of post-closure performance. HMIP has developed procedures for the assessment of this Case, based upon experience of the previous Drigg assessments, and also upon the experience of similar work carried out in the assessment of Intermediate Level Waste (ILW) disposal at both deep and shallow potential sites. This paper describes the more important features of these procedures.« less
Current Regulations and Regulatory Actions
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.
Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schreck, R.I.
1991-10-01
The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, andmore » restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.« less
Atmospheric Radiation Measurement program climate research facility operations quarterly report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.; Decision and Information Sciences
2006-09-06
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period April 1 through June 30, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The third quarter comprises a total of 2,184 hours. For all fixed sites (especially the TWP locale) and the AMF, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the third quarter of fiscal year (FY) 2006.« less
Nevada National Security Site Environmental Report 2012 Attachment A: Site Description
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills, Cathy A
This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2012 (National Security Technologies, LLC [NSTec], 2013). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, andmore » assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.« less
Nevada National Security Site Environmental Report 2013 Attachment A: Site Description
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills, C.
This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2012 (National Security Technologies, LLC [NSTec], 2013). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, andmore » assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.« less
Focused intracochlear electric stimulation with phased array channels.
van den Honert, Chris; Kelsall, David C
2007-06-01
A method is described for producing focused intracochlear electric stimulation using an array of N electrodes. For each electrode site, N weights are computed that define the ratios of positive and negative electrode currents required to produce cancellation of the voltage within scala tympani at all of the N-1 other sites. Multiple sites can be stimulated simultaneously by superposition of their respective current vectors. The method allows N independent stimulus waveforms to be delivered to each of the N electrode sites without spatial overlap. Channel interaction from current spread associated with monopolar stimulation is substantially eliminated. The method operates by inverting the spread functions of individual monopoles as measured with the other electrodes. The method was implemented and validated with data from three human subjects implanted with 22-electrode perimodiolar arrays. Results indicate that (1) focusing is realizable with realistic precision; (2) focusing comes at the cost of increased total stimulation current; (3) uncanceled voltages that arise beyond the ends of the array are weak except when stimulating the two end channels; and (4) close perimodiolar positioning of the electrodes may be important for minimizing stimulation current and sensitivity to measurement errors.
Opportunities for Launch Site Integrated System Health Engineering and Management
NASA Technical Reports Server (NTRS)
Waterman, Robert D.; Langwost, Patricia E.; Waterman, Susan J.
2005-01-01
The launch site processing flow involves operations such as functional verification, preflight servicing and launch. These operations often include hazards that must be controlled to protect human life and critical space hardware assets. Existing command and control capabilities are limited to simple limit checking durig automated monitoring. Contingency actions are highly dependent on human recognition, decision making, and execution. Many opportunities for Integrated System Health Engineering and Management (ISHEM) exist throughout the processing flow. This paper will present the current human-centered approach to health management as performed today for the shuttle and space station programs. In addition, it will address some of the more critical ISHEM needs, and provide recommendations for future implementation of ISHEM at the launch site.
NASA Astrophysics Data System (ADS)
Kibrick, Robert I.; Wirth, Gregory D.; Allen, Steven L.; Deich, William T. S.; Goodrich, Robert W.; Lanclos, Kyle; Lyke, James E.
2011-03-01
For over a decade, the W. M. Keck Observatory's two 10-meter telescopes have been operated remotely from its Waimea headquarters. Over the last 9 years, WMKO remote observing has expanded to allow observing teams at dedicated sites located across California to observe via the Internet either in collaboration with colleagues in Waimea or entirely from California; this capability was extended to Swinburne University in Melbourne, Australia in 2010 and to Yale University in New Haven, Connecticut in early 2011. All Keck facility science instruments are currently supported. Observers distributed between as many as four sites can collaborate in the interactive operation of each instrument by means of shared VNC desktops and multipoint video and/or telephone conferencing. Automated routers at primary remote observing sites ensure continued connectivity during Internet outages. Each Keck remote observing facility is similarly equipped and configured so observers have the same operating environment. This architecture provides observers the flexibility to conduct observations from the location best suited to their needs and to adapt to last-minute changes. It also enhances the ability of off-site technical staff to provide remote support.
NASA Scientific Data Purchase Project: From Collection to User
NASA Technical Reports Server (NTRS)
Nicholson, Lamar; Policelli, Fritz; Fletcher, Rose
2002-01-01
NASA's Scientific Data Purchase (SDP) project is currently a $70 million operation managed by the Earth Science Applications Directorate at Stennis Space Center. The SDP project was developed in 1997 to purchase scientific data from commercial sources for distribution to NASA Earth science researchers. Our current data holdings include 8TB of remote sensing imagery consisting of 18 products from 4 companies. Our anticipated data volume is 60 TB by 2004, and we will be receiving new data products from several additional companies. Our current system capacity is 24 TB, expandable to 89 TB. Operations include tasking of new data collections, archive ordering, shipment verification, data validation, distribution, metrics, finances, customer feedback, and technical support. The program has been included in the Stennis Space Center Commercial Remote Sensing ISO 9001 registration since its inception. Our operational system includes automatic quality control checks on data received (with MatLab analysis); internally developed, custom Web-based interfaces that tie into commercial-off-the-shelf software; and an integrated relational database that links and tracks all data through operations. We've distributed nearly 1500 datasets, and almost 18,000 data files have been downloaded from our public web site; on a 10-point scale, our customer satisfaction index is 8.32 at a 23% response level. More information about the SDP is available on our Web site.
Analysis of governmental Web sites on food safety issues: a global perspective.
Namkung, Young; Almanza, Barbara A
2006-10-01
Despite a growing concern over food safety issues, as well as a growing dependence on the Internet as a source of information, little research has been done to examine the presence and relevance of food safety-related information on Web sites. The study reported here conducted Web site analysis in order to examine the current operational status of governmental Web sites on food safety issues. The study also evaluated Web site usability, especially information dimensionalities such as utility, currency, and relevance of content, from the perspective of the English-speaking consumer. Results showed that out of 192 World Health Organization members, 111 countries operated governmental Web sites that provide information about food safety issues. Among 171 searchable Web sites from the 111 countries, 123 Web sites (71.9 percent) were accessible, and 81 of those 123 (65.9 percent) were available in English. The majority of Web sites offered search engine tools and related links for more information, but their availability and utility was limited. In terms of content, 69.9 percent of Web sites offered information on foodborne-disease outbreaks, compared with 31.5 percent that had travel- and health-related information.
Decommissioning of magnox Ltd fuel cooling pond facilities in the UK
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bertoncini, Carlo
2013-07-01
Magnox reactors were the first generation of nuclear power stations built in the UK; ten sites in total, of which, nine had wet fuel routes with cooling ponds. Five ponds are currently in a decommissioning phase; this paper will focus primarily on Hunterston-A (HNA) Site and the central programme of work which governs its management. During its operation, the Cartridge Cooling Pond at HNA was used to receive the spent fuel discharged from the Site's two reactors, it was then stored for cooling purposes prior to dispatch off site. The current decommissioning phase focusses on draining the 6500 m{sup 3}more » pond. Due to the Site's limited caesium removal facilities, a stand-alone effluent treatment plant was constructed to improve abatement and reduce the pond activity from 200 to 0.7 Bq/ml (β). This was necessary due to increased environmental standards introduced since the site had ceased generation ten years previously. Early characterisation and experience from other sites concluded that if the pond were to be drained without any treatment to the walls, doses to the Operators, during subsequent decommissioning works, would routinely be in excess of 1 mSv.hr{sup -1}(γ). An opportunity was realised within the Ponds Programme that if the surface layer of the pond walls were to be removed during drain-down, ambient dose rates would be reduced by a factor of 10; this would allow for more cost-effective decommissioning options in the future. Ultrahigh pressure water jetting was tested and proved to yield a ∼95% total-activity reduction on treated surfaces. Challenges were overcome in providing safe and secure access to Decommissioning Operators to perform this operation by means of floating platforms on the surface of the pond. As strategies to clear facilities to exemption levels are becoming both cost prohibitive and not reasonably practicable, work is now underway in the Programme to determine the optimum condition for entry into long-term quiescent storage, prior to final demolition. This paper will discuss the strategy and techniques which led to Magnox Ltd ponds to be of national and international interest to the nuclear community. (authors)« less
Risk factors for acute surgical site infections after lumbar surgery: a retrospective study.
Lai, Qi; Song, Quanwei; Guo, Runsheng; Bi, Haidi; Liu, Xuqiang; Yu, Xiaolong; Zhu, Jianghao; Dai, Min; Zhang, Bin
2017-07-19
Currently, many scholars are concerned about the treatment of postoperative infection; however, few have completed multivariate analyses to determine factors that contribute to the risk of infection. Therefore, we conducted a multivariate analysis of a retrospectively collected database to analyze the risk factors for acute surgical site infection following lumbar surgery, including fracture fixation, lumbar fusion, and minimally invasive lumbar surgery. We retrospectively reviewed data from patients who underwent lumbar surgery between 2014 and 2016, including lumbar fusion, internal fracture fixation, and minimally invasive surgery in our hospital's spinal surgery unit. Patient demographics, procedures, and wound infection rates were analyzed using descriptive statistics, and risk factors were analyzed using logistic regression analyses. Twenty-six patients (2.81%) experienced acute surgical site infection following lumbar surgery in our study. The patients' mean body mass index, smoking history, operative time, blood loss, draining time, and drainage volume in the acute surgical site infection group were significantly different from those in the non-acute surgical site infection group (p < 0.05). Additionally, diabetes mellitus, chronic obstructive pulmonary disease, osteoporosis, preoperative antibiotics, type of disease, and operative type in the acute surgical site infection group were significantly different than those in the non-acute surgical site infection group (p < 0.05). Using binary logistic regression analyses, body mass index, smoking, diabetes mellitus, osteoporosis, preoperative antibiotics, fracture, operative type, operative time, blood loss, and drainage time were independent predictors of acute surgical site infection following lumbar surgery. In order to reduce the risk of infection following lumbar surgery, patients should be evaluated for the risk factors noted above.
Environmental projects. Volume 7: Environmental resources document
NASA Technical Reports Server (NTRS)
Kushner, Len; Kroll, Glenn
1988-01-01
The Goldstone Deep Space Communications Complex (GDSCC) in Barstow, California, is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Goldstone is managed, directed and operated by the Jet Propulsion Laboratory of Pasadena, California. The GDSCC includes five distinct operational sites: Echo, Venus, Mars, Apollo, and Mojave Base. Within each site is a Deep Space Station (DPS), consisting of a large dish antenna and its support facilities. As required by NASA directives concerning the implementation of the National Environmental Policy Act, each NASA field installation is to publish an Environmental Resources Document describing the current environment at the installation, including any adverse effects that NASA operations may have on the local environment.
Commonality of Ground Systems in Launch Operations
NASA Technical Reports Server (NTRS)
Quinn, Shawn M.
2008-01-01
NASA is examining the utility of requiring a certain degree of commonality in both flight and ground systems in the Constellation Program. While the benefits of commonality seem obvious in terms of minimizing upfront development and long-term operations and maintenance costs, success in real, large-scale engineering systems used to support launch operations is relatively unknown. A broad literature review conducted for this paper did not yield a single paper specifically addressing the application of commonality for ground systems at any launch site in the United States or abroad. This paper provides a broad overview of the ground systems, captures historical and current application of commonality at the launch site, and offers suggestions for additional research to further develop commonality approaches.
Radiological criteria for underground nuclear tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malik, J.S.; Brownlee, R.R.; Costa, C.F.
1981-04-01
The radiological criteria for the conduct of nuclear tests have undergone many revisions with the current criteria being 0.17 rad for uncontrolled populations and 0.5 rad for controllable populations. Their effect upon operations at the Nevada Test Site and the current off-site protective plans are reviewed for areas surrounding the Site. The few accidental releases that have occurred are used to establish estimates of probability of release and of hazard to the population. These are then put into context by comparing statistical data on other accidents and cataclysms. The guidelines established by DOE Manual Chapter MC-0524 have never been exceededmore » during the entire underground nuclear test program. The probability of real hazard to off-site populations appears to be sufficiently low as not to cause undue concern to the citizenry.« less
Research to Operations: The Critical Transition
NASA Technical Reports Server (NTRS)
Fogarty, Jennifer A.
2009-01-01
Space Life Sciences Directorate (SLSD) specializes in transitioning technology and knowledge to medical operations. This activity encompasses funding a spectrum of research and technology efforts, such as understanding fundamental biological mechanisms altered by microgravity and executing technology watches for state of the art diagnostic imaging equipment. This broad spectrum approach to fulfilling the need to protect crewmember health and performance during long and short duration missions to the International Space Station, moon and Mars is made possible by having a line of site between research and operations. Currently, SLSD's line of site is articulated in a transition to medical practice (TMP) process. This process is designed to shepherd information and knowledge gained through fundamental and mechanistic research toward the development of an operational solution such as a pre-flight selection criteria; an in-flight countermeasure, monitoring capability or treatment; or a post-flight reconditioning program. The TMP process is also designed to assist with the customization of mature hardware or technology for NASA specific use. The benefits of this process are that the concept of operational usability is interjected early in the research, design, or acquisition phase, and stakeholders are involved early to identify requirements and also periodically asked to assess requirements compliance of research or technology development project. Currently a device known as the actiwatch is being assessed for the final transition to operational use. Specific examples of research to operations transition success help to illustrate the process and bolster communication between the research and medical operations communities.
2015-06-01
National Instruments. The National Instruments DAQ is a full-featured PC running Windows 7. The DAQ, electromagnetic transmitter , and batteries for the... electromagnetic induction Environet Environet, Inc. ESTCP Environmental Security Technology Certification Program ftp file transfer protocol FUDS formerly used...capabilities of a currently available advanced electromagnetic induction sensor developed specifically for discrimination on real sites under operational
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... operators/users located within a grantee's ``service area'' in the context of the Board's standard 2,000... Foreign-Trade Zones Act, as amended (19 U.S.C. 81a-81u), and the regulations of the Board (15 CFR part 400... current zone project includes the following sites: Site 1 (22 acres)--Port of Memphis at President's...
NASA Technical Reports Server (NTRS)
2005-01-01
The Baseline Report captures range and spaceport capabilities at five sites: KSC, CCAFS, VAFB, Wallops, and Kodiak. The Baseline depicts a future state that relies on existing technology, planned upgrades, and straight-line recapitalization at these sites projected through 2030. The report presents an inventory of current spaceport and range capabilities at these five sites. The baseline is the first part of analyzing a business case for a set of capabilities designed to transform U.S. ground and space launch operations toward a single, integrated national "system" of space transportation systems. The second part of the business case compares current capabilities with technologies needed to support the integrated national "system". The final part, a return on investment analysis, identifies the technologies that best lead to the integrated national system and reduce recurring costs..Numerous data sources were used to define and describe the baseline spaceport and range by identifying major systems and elements and describing capabilities, limitations, and capabilities
NASA Astrophysics Data System (ADS)
Podesto, B.; Lapointe, A.; Larose, G.; Robichaud, Y.; Vaillancourt, C.
1981-03-01
The design and construction of a Real-Time Digital Data Acquisition System (RTDDAS) to be used in substations for on-site recording and preprocessing load response data were included. The gathered data can be partially processed on site to compute the apparent, active and reactive powers, voltage and current rms values, and instantaneous values of phase voltages and currents. On-site processing capability is provided for rapid monitoring of the field data to ensure that the test setup is suitable. Production analysis of field data is accomplished off-line on a central computer from data recorded on a dual-density (800/1600) magnetic tape which is IBM-compatible. Parallel channels of data can be recorded at a variable rate from 480 to 9000 samples per second per channel. The RTDDAS is housed in a 9.1 m (30-ft) trailer which is shielded from electromagnetic interference and protected by isolators from switching surges. The test must sometimes be performed. Information pertaining to the installation, software operation, and maintenance is presented.
Operationally Efficient Propulsion System Study (OEPSS): OEPSS Video Script
NASA Technical Reports Server (NTRS)
Wong, George S.; Waldrop, Glen S.; Trent, Donnie (Editor)
1992-01-01
The OEPSS video film, along with the OEPSS Databooks, provides a data base of current launch experience that will be useful for design of future expendable and reusable launch systems. The focus is on the launch processing of propulsion systems. A brief 15-minute overview of the OEPSS study results is found at the beginning of the film. The remainder of the film discusses in more detail: current ground operations at the Kennedy Space Center; typical operations issues and problems; critical operations technologies; and efficiency of booster and space propulsion systems. The impact of system architecture on the launch site and its facility infrastucture is emphasized. Finally, a particularly valuable analytical tool, developed during the OEPSS study, that will provide for the "first time" a quantitative measure of operations efficiency for a propulsion system is described.
B. E. Carpenter
1959-01-01
But how about bolts from cull oaks on upland pine sites? Though a bolt operation in such material offers many difficulties, at least one Southern firm is currently trying it. That firm is Potlatch Forests, Inc., of Warren, Arkansas.
Use of Hawaii Analog Sites for Lunar Science and In-Situ Resource Utilization
NASA Astrophysics Data System (ADS)
Sanders, G. B.; Larson, W. E.; Picard, M.; Hamilton, J. C.
2011-10-01
In-Situ Resource Utilization (ISRU) and lunar science share similar objectives with respect to analyzing and characterizing the physical, mineral, and volatile materials and resources at sites of robotic and human exploration. To help mature and stress instruments, technologies, and hardware and to evaluate operations and procedures, space agencies have utilized demonstrations at analog sites on Earth before use in future missions. The US National Aeronautics and Space Administration (NASA), the Canadian Space Agency (CSA), and the German Space Agency (DLR) have utilized an analog site on the slope of Mauna Kea on the Big Island of Hawaii to test ISRU and lunar science hardware and operations in two previously held analog field tests. NASA and CSA are currently planning on a 3rd analog field test to be held in June, 2012 in Hawaii that will expand upon the successes from the previous two field tests.
Use of Hawaii Analog Sites for Lunar Science and In-Situ Resource Utilization
NASA Technical Reports Server (NTRS)
Sanders, G. B.; Larson, W. E.; Picard, M.; Hamilton, J. C.
2011-01-01
In-Situ Resource Utilization (ISRU) and lunar science share similar objectives with respect to analyzing and characterizing the physical, mineral, and volatile materials and resources at sites of robotic and human exploration. To help mature and stress instruments, technologies, and hardware and to evaluate operations and procedures, space agencies have utilized demonstrations at analog sites on Earth before use in future missions. The US National Aeronautics and Space Administration (NASA), the Canadian Space Agency (CSA), and the German Space Agency (DLR) have utilized an analog site on the slope of Mauna Kea on the Big Island of Hawaii to test ISRU and lunar science hardware and operations in two previously held analog field tests. NASA and CSA are currently planning on a 3rd analog field test to be held in June, 2012 in Hawaii that will expand upon the successes from the previous two field tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ivarson, Kristine A.; Miller, Charles W.; Arola, Craig C.
Groundwater contamination by hexavalent chromium and other nuclear reactor operation-related contaminants has resulted in the need for groundwater remedial actions within the Hanford Site reactor areas (the Hanford Site 100 Area). The large geographic extent of the resultant contaminant plumes requires an extensive level of understanding of the aquifer structure, characteristics, and configuration to support assessment and design of remedial alternatives within the former 100-D, 100-H, and 100-K reactor areas. The authors have prepared two- and three-dimensional depictions of the key subsurface geologic structures at two Hanford Site reactor operable units (100-K and 100-D/H). These depictions, prepared using commercial-off-the-shelf (COTS)more » visualization software, provide a basis for expanding the understanding of groundwater contaminant migration pathways, including identification of geologically-defined preferential groundwater flow pathways. These identified preferential flow pathways support the conceptual site model and help explain both historical and current contaminant distribution and transport. (authors)« less
Nevada National Security Site Environmental Report 2011 Attachment A: Site Description
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cathy Wills, ed.
2012-09-12
This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2011. Included are subsections that summarize the site's geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operationsmore » on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.« less
Nevada National Security Site Environmental Report 2016, Attachment A: Site Description
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills, Cathy
This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2016 (prepared by National Security Technologies, LLC [NSTec], 2017). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current sitemore » operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the amended remedial action for Operable Units 3, 4, and 5 (OUs 3, 4, and 5) at Eielson Air Force Base (AFB). This decision is based on the Administrative Record for OU 3, 4, and 5, updated in July 1998, to include new information generated since the original Record of Decision was signed on 30 September 1995 (PB95-964618). This amendment applies to OU3 site DP44 (Battery Shop Leach Field Building), OU4 sites SS35 (Asphalt Mixing Area) and ST58 (Old Quartermaster Service Station), and OU5 sites LF03/FT09 (Current Inactive Base Landfill/Fire Training Area). Through new information, contaminantmore » levels than interpreted prior to signing the original ROD document. Proper enforcement of Institutional Controls (IC`s) at all sites will be effective in controlling and restricting access to contaminated media at the sites remediation goals are achieved.« less
Fontecha, John E; Akhavan-Tabatabaei, Raha; Duque, Daniel; Medaglia, Andrés L; Torres, María N; Rodríguez, Juan Pablo
In this work we tackle the problem of planning and scheduling preventive maintenance (PM) of sediment-related sewer blockages in a set of geographically distributed sites that are subject to non-deterministic failures. To solve the problem, we extend a combined maintenance and routing (CMR) optimization approach which is a procedure based on two components: (a) first a maintenance model is used to determine the optimal time to perform PM operations for each site and second (b) a mixed integer program-based split procedure is proposed to route a set of crews (e.g., sewer cleaners, vehicles equipped with winches or rods and dump trucks) in order to perform PM operations at a near-optimal minimum expected cost. We applied the proposed CMR optimization approach to two (out of five) operative zones in the city of Bogotá (Colombia), where more than 100 maintenance operations per zone must be scheduled on a weekly basis. Comparing the CMR against the current maintenance plan, we obtained more than 50% of cost savings in 90% of the sites.
Operational Strategies for Low-Level Radioactive Waste Disposal Site in Egypt - 13513
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mohamed, Yasser T.
The ultimate aims of treatment and conditioning is to prepare waste for disposal by ensuring that the waste will meet the waste acceptance criteria of a disposal facility. Hence the purpose of low-level waste disposal is to isolate the waste from both people and the environment. The radioactive particles in low-level waste emit the same types of radiation that everyone receives from nature. Most low-level waste fades away to natural background levels of radioactivity in months or years. Virtually all of it diminishes to natural levels in less than 300 years. In Egypt, The Hot Laboratories and Waste Management Centermore » has been established since 1983, as a waste management facility for LLW and ILW and the disposal site licensed for preoperational in 2005. The site accepts the low level waste generated on site and off site and unwanted radioactive sealed sources with half-life less than 30 years for disposal and all types of sources for interim storage prior to the final disposal. Operational requirements at the low-level (LLRW) disposal site are listed in the National Center for Nuclear Safety and Radiation Control NCNSRC guidelines. Additional procedures are listed in the Low-Level Radioactive Waste Disposal Facility Standards Manual. The following describes the current operations at the LLRW disposal site. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Charles R.; Bergeron, Marcel P.; Wurstner, Signe K.
2001-05-31
This report describes a new initiative to strengthen the technical defensibility of predictions made with the Hanford site-wide groundwater flow and transport model. The focus is on characterizing major uncertainties in the current model. PNNL will develop and implement a calibration approach and methodology that can be used to evaluate alternative conceptual models of the Hanford aquifer system. The calibration process will involve a three-dimensional transient inverse calibration of each numerical model to historical observations of hydraulic and water quality impacts to the unconfined aquifer system from Hanford operations since the mid-1940s.
Kamboj, Sunita; Yu, Charley; Johnson, Robert
2013-05-01
The Derived Concentration Guideline Levels for two building areas previously used in waste processing and storage at Argonne National Laboratory were developed using both probabilistic and deterministic radiological environmental pathway analysis. Four scenarios were considered. The two current uses considered were on-site industrial use and off-site residential use with farming. The two future uses (i.e., after an institutional control period of 100 y) were on-site recreational use and on-site residential use with farming. The RESRAD-OFFSITE code was used for the current-use off-site residential/farming scenario and RESRAD (onsite) was used for the other three scenarios. Contaminants of concern were identified from the past operations conducted in the buildings and the actual characterization done at the site. Derived Concentration Guideline Levels were developed for all four scenarios using deterministic and probabilistic approaches, which include both "peak-of-the-means" and "mean-of-the-peaks" analyses. The future-use on-site residential/farming scenario resulted in the most restrictive Derived Concentration Guideline Levels for most radionuclides.
Eye Safe, Visible Wavelength Lidar Systems: Design and Operational Advances, Results and Potential
NASA Technical Reports Server (NTRS)
Spinhirne, James; Welton, Ellsworth J.; Berkoff, Timothy; Campbell, James
2007-01-01
In the early nineties the first of the eye safe visible wavelength lidar systems known now as Micro Pulse Lidar (MPL) became operational. The important advance of the design was a system that, unlike most existing lidar, operated at eye safe energy densities and could thus operate unattended for full time monitoring. Since that time there have been many dozens of these systems produced and applied for full time profiling of atmospheric cloud and aerosol structure. There is currently an observational network of MPL sites to support global climate research. In thc course of application of these instruments there have been significant improvements in the, design and performance of the systems. In the last half decade particularly there has been significant application and technical development of MPL systems. In this paper we review progress. The current MPL systems in use are all single wavelength systems designed for cloud and aerosol applications. For the cloud and aerosol applications, both lidar depolarization and multi wavelength measurements have significant applications. These can be accomplished with the MPL, approach. The main current challenge for the lidar network activity are in the area of the reliability, repeatability and efficiency of data processing. The network makes use of internet data downloads and automated processing. The heights of all cloud and aerosol layers are needed. The recent emphasis has been in operationally deriving aerosol extinction cross section. Future emphasis will include adding cirrus optical parameters. For operational effectiveness, improvements to simplify routine data signal calibration are being researched. Overall the MPL systems have proven very effective. A large data base of results from globally distributed sites can be easily accessed through the internet. Applications have included atmospheric model development. Validation of current global satellite observations of aerosol and clouds, including now orbital lidar observations, was a primary goal for NASA. Although sampling issues require careful consideration, results have proven useful.
1981-11-01
evaluate and test these ideas in the Internet research context. 4. Field third-generation gateways. At this point in time, we purposely avoid selecting a...plan to cover the period from now until the time when a gateway system can be fielded which implements the results of the current work in the Internet ... research community. The current gateway system is inadequate from both a functionality and a• performance standpoint, and therefore the transition
A Mobile Robot for Remote Response to Incidents Involving Hazardous Materials
NASA Technical Reports Server (NTRS)
Welch, Richard V.
1994-01-01
This paper will describe a teleoperated mobile robot system being developed at JPL for use by the JPL Fire Department/HAZMAT Team. The project, which began in October 1990, is focused on prototyping a robotic vehicle which can be quickly deployed and easily operated by HAZMAT Team personnel allowing remote entry and exploration of a hazardous material incident site. The close involvement of JPL Fire Department personnel has been critical in establishing system requirements as well as evaluating the system. The current robot, called HAZBOT III, has been especially designed for operation in environments that may contain combustible gases. Testing of the system with the Fire Department has shown that teleoperated robots can successfully gain access to incident sites allowing hazardous material spills to be remotely located and identified. Work is continuing to enable more complex missions through enhancement of the operator interface and by allowing tetherless operation.
Remedial Investigation of Hanford Site Releases to the Columbia River - 13603
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Hulstrom, L.C.; Sands, J.P.
2013-07-01
In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previouslymore » investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)« less
OSHA standard for medical surveillance of hazardous waste workers.
Melius, J M
1990-01-01
The increasing amount of work involving hazardous waste sites and the heavy involvement of the federal and state governments in this work have led to the gradual development of guidelines and standards providing for occupational safety and health programs for these sites. On March 6, 1989, the Occupational Safety and Health Administration published its final rule governing occupational safety and health matters at hazardous waste sites and emergency operations. This rule is currently scheduled to take effect on March 6, 1990. This chapter will briefly describe this regulation, particularly its medical surveillance requirements.
NASA Astrophysics Data System (ADS)
Nejat, Cyrus
2012-01-01
The Nejat Aerospace Magnoplane (NAM) is designed as a low speed (Mach < 1:00) aerial vehicle that it can be modified as a high speed aerial vehicle. This aerial vehicle is able to operate on highlands and hilly sites such as landing on and launching from the mentioned sites. The problem concerns with launching and landing of the vehicle on and from sites where there are highlands with bushes difficulties. Also, where there is short area for landing of regular airplane. This project is pursued for patent registration and highly modified version current airplanes.
Radiographic Detectability of Retained Neuropatties in a Cadaver Model.
Luo, Wangjian Thomas; Almack, Robert; Mawson, John B; Cochrane, David Douglas
2015-08-01
Counts are the commonest method used to ensure that all sponges and neuropatties are removed from a surgical site before closure. When the count is not reconciled, plain radiographs of the operative site are taken to determine whether the missing patty has been left in the wound. The purpose of this study was to describe the detectability of commonly used neuropatties in the clinical setting using digital technologies. Neuropatties were implanted into the anterior and posterior cranial fossae and the thoracolumbar extradural space of a mature male cadaver. Four neuropatty sizes were used: 3 × 1 in, 2 × ½ in, ½ × ½ in, and ¼ × ¼ in. Neuropatties, with size and location chosen at random, were placed in the surgical sites and anteroposterior/posterior-anterior and lateral radiographs were taken using standard portable digital radiographic equipment. Six clinicians reviewed the digital images for the presence or absence of neuropatties. The readers were not aware of the number and size of the patties that were included in each image. The detectability of neuropatties is dependent on the size of the neuropatty's radiopaque marker and the operative site. Neuropatties measuring 2 × ½ in and 3 × 1 in were detected reliably regardless of the operative site. ¼ × ¼ in neuropatties were poorly detected by neurosurgeons and radiologists in all three operative sites. Readers of various experience and background were similar in their ability to detect neuropatties under these conditions. Under simulated operating room conditions and using currently available neuropatties and plain radiograph imaging technology, small ¼-in and ½-in neuropatties are poorly visible/detectable on digital images. Copyright © 2015 Elsevier Inc. All rights reserved.
Hazardous Waste Cleanup: Safety-Kleen Corporation in Southampton Township, New Jersey
The site has been reportedly in operation since 1976 and is currently an active transfer station for distribution of fresh solvent products and the collection and temporary storage of used solvent wastes (prior to subsequent transportation and recycling
Remote video assessment for missile launch facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, G.G.; Stewart, W.A.
1995-07-01
The widely dispersed, unmanned launch facilities (LFs) for land-based ICBMs (intercontinental ballistic missiles) currently do not have visual assessment capability for existing intrusion alarms. The security response force currently must assess each alarm on-site. Remote assessment will enhance manpower, safety, and security efforts. Sandia National Laboratories was tasked by the USAF Electronic Systems Center to research, recommend, and demonstrate a cost-effective remote video assessment capability at missile LFs. The project`s charter was to provide: system concepts; market survey analysis; technology search recommendations; and operational hardware demonstrations for remote video assessment from a missile LF to a remote security center viamore » a cost-effective transmission medium and without using visible, on-site lighting. The technical challenges of this project were to: analyze various video transmission media and emphasize using the existing missile system copper line which can be as long as 30 miles; accentuate and extremely low-cost system because of the many sites requiring system installation; integrate the video assessment system with the current LF alarm system; and provide video assessment at the remote sites with non-visible lighting.« less
Alloy Selection for Accident Tolerant Fuel Cladding in Commercial Light Water Reactors
NASA Astrophysics Data System (ADS)
Rebak, Raul B.
2015-12-01
As a consequence of the March 2011 events at the Fukushima site, the U.S. congress asked the Department of Energy (DOE) to concentrate efforts on the development of nuclear fuels with enhanced accident tolerance. The new fuels had to maintain or improve the performance of current UO2-zirconium alloy rods during normal operation conditions and tolerate the loss of active cooling in the core for a considerably longer time period than the current system. DOE is funding cost-shared research to investigate the behavior of advanced steels both under normal operation conditions in high-temperature water [ e.g., 561 K (288 °C)] and under accident conditions for reaction with superheated steam. Current results show that, under accident conditions, the advanced ferritic steels (1) have orders of magnitude lower reactivity with steam, (2) would generate less hydrogen and heat than the current zirconium alloys, (3) are resistant to stress corrosion cracking under normal operation conditions, and (4) have low general corrosion in water at 561 K (288 °C).
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... Flow Providers and Clearing Members and Make a Conforming Change to the Current Text in the Fee... change to the current text in the Fee Schedule. The proposed change will be operative on July 1, 2012. The text of the proposed rule change is available on the Exchange's Web site at www.nyse.com , at the...
Robinson, G.R.; Kapo, K.E.
2004-01-01
Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative to transportation network and population distribution data. The models can be used on a regional scale to quickly map the relative site suitability for a RAP or RPCC aggregate recycling operation in a particular area based on transportation network and population parameters. The results can be used to identify general areas to be further evaluated on a site-specific basis using more detailed marketplace information. As transportation or population features change due to planning or actual development, the models can be easily revised to reflect these changes. ?? 2004 Elsevier B.V. All rights reserved.
Optimization of site layout for change of plant operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reuwer, S.M.; Kasperski, E.; Joseph, T.D.
1995-12-31
Several of the Florida Power & Light operating fossil power plants have undergone significant site layout changes as well as changes in plant operation. The FPL Fort Lauderdale Plant was repowered in 1992 which consisted of using four (4) Westinghouse 501F Combustion Turbines rated at 158 Mw each, to repower two (2) existing steam turbines rates at 143 Mw each. In 1991, a physical security fence separation occurred between Turkey Point Plants`s fossil fueled Units 1&2, and its nuclear fueled Units 3&4. As a result of this separation, certain facilities common to both the nuclear side and fossil side ofmore » the plant required relocating. Also, the Sanford and Manatee Plants were evaluated for the use of a new fuel as an alternative source. Manatee Plant is currently in the licensing process for modifications to burn a new fuel, requiring expansion of backened clean-up equipment, with additional staff to operate this equipment. In order to address these plant changes, site development studies were prepared for each plant to determine the suitability of the existing ancillary facilities to support the operational changes, and to make recommendations for facility improvement if found inadequate. A standardized process was developed for all of the site studies. This proved to be a comprehensive process and approach, that gave FPL a successful result that all the various stake holders bought into. This process was objectively based, focused, and got us to where we need to be as quickly as possible. As a result, this paper details the outline and various methods developed to prepare a study following this process, that will ultimately provide the optimum site development plan for the changing plant operations.« less
The IUE Science Operations Ground System
NASA Technical Reports Server (NTRS)
Pitts, Ronald E.; Arquilla, Richard
1994-01-01
The International Ultraviolet Explorer (IUE) Science Operations System provides full realtime operations capabilities and support to the operations staff and astronomer users. The components of this very diverse and extremely flexible hardware and software system have played a major role in maintaining the scientific efficiency and productivity of the IUE. The software provides the staff and user with all the tools necessary for pre-visit and real-time planning and operations analysis for any day of the year. Examples of such tools include the effects of spacecraft constraints on target availability, maneuver times between targets, availability of guide stars, target identification, coordinate transforms, e-mail transfer of Observatory forms and messages, and quick-look analysis of image data. Most of this extensive software package can also be accessed remotely by individual users for information, scheduling of shifts, pre-visit planning, and actual observing program execution. Astronomers, with a modest investment in hardware and software, may establish remote observing sites. We currently have over 20 such sites in our remote observers' network.
A combined quality-control methodology in Ebro Delta (NE Spain) high frequency radar system
NASA Astrophysics Data System (ADS)
Lorente, P.; Piedracoba, S.; Soto-Navarro, J.; Alvarez-Fanjul, E.
2015-08-01
Ebro River Delta is a relevant marine protected area in the western Mediterranean. In order to promote the conservation of its ecosystem and support operational decision making in this sensitive area, a three site standard-range (13.5 MHz) CODAR SeaSonde High Frequency (HF) radar was deployed in 2013. Since there is a growing demand for reliable HF radar surface current measurements, the main goal of this work is to present a combined quality control methodology. Firstly, one year-long (2014) real-time web monitoring of nonvelocity-based diagnostic parameters is conducted in order to infer both radar site status and HF radar system performance. Signal-to-noise ratio at the monopole exhibited a consistent monthly evolution although some abrupt decreases (below 10 dB), occasionally detected in June for one of the radar sites, impacted negatively on the spatiotemporal coverage of total current vectors. It seemed to be a sporadic episode since radar site overall performance was found to be robust during 2014. Secondly, a validation of HF radar data with independent in situ observations from a moored current meter was attempted for May-October 2014. The accuracy assessment of radial and total vectors revealed a consistently high agreement. The directional accuracy of the HF radar was rated at better than 8°. The correlation coefficient and RMSE values emerged in the ranges 0.58-0.83 and 4.02-18.31 cm s-1, respectively. The analysis of the monthly averaged current maps for 2014 showed that the HF radar properly represented basic oceanographic features previously reported, namely: the predominant southwestward flow, the coastal clockwise eddy confined south of Ebro Delta mouth or the Ebro River impulsive-type freshwater discharge. Future works should include the use of verified HF radar data for the rigorous skill assessment of operational ocean circulation systems currently running in Ebro estuarine region like MyOcean IBI.
Mars Surface Systems Common Capabilities and Challenges for Human Missions
NASA Technical Reports Server (NTRS)
Toups, Larry; Hoffman, Stephen J.; Watts, Kevin
2016-01-01
This paper describes the current status of common systems and operations as they are applied to actual locations on Mars that are representative of Exploration Zones (EZ) - NASA's term for candidate locations where humans could land, live and work on the martian surface. Given NASA's current concepts for human missions to Mars, an EZ is a collection of Regions of Interest (ROIs) located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. An EZ also contains a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. The Evolvable Mars Campaign (EMC), a description of NASA's current approach to these human Mars missions, assumes that a single EZ will be identified within which NASA will establish a substantial and durable surface infrastructure that will be used by multiple human crews. The process of identifying and eventually selecting this single EZ will likely take many years to finalized. Because of this extended EZ selection process it becomes important to evaluate the current suite of surface systems and operations being evaluated for the EMC as they are likely to perform at a variety of proposed EZ locations and for the types of operations - both scientific and development - that are proposed for these candidate EZs. It is also important to evaluate proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC.
The Willard L. Eccles Observatory: Commissioning and Development of Remote Operation Capabilities
NASA Astrophysics Data System (ADS)
Springer, Wayne; Dawson, Kyle; Gondolo, Paolo; Ricketts, Paul; Ramsrud, Nicolas; Samarasingha, Upul
2011-03-01
The University of Utah completed construction of the Willard L. Eccles Observatory located on Frisco Peak near Milford, UT in October 2009. The observatory site is located on a prominent peak at an altitude of approximately 9600 feet in a region with minimal light pollution. The Frisco Peak site was chosen after careful consideration of many factors including climate, light pollution and available infrastructure. The facility houses a 32" telescope manufactured by DFM Engineering of Longmont, CO. Further development of remote operation capabilities is currently being undertaken. Monitoring of the weather and seeing conditions are being performed and confirm the excellent nature of the site for astronomical observations. The observatory facilities will be used for educational and public outreach activities as well as research projects. A description of the facility and its planned use will be provided.
Oak Ridge Reservation annual site environmental report for 1997: Color your tomorrow
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamilton, L.V.
1998-10-01
The U.S. Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. The reservation contains three major operating sites: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried outmore » for the war effort and subsequent research, development, and production activities have involved (and continue to involve) radiological and hazardous materials.« less
Williams, Cory A.; Richards, Rodney J.; Collins, Kent L.
2015-01-01
The U.S. Bureau of Reclamation (USBR) and local stakeholder groups are evaluating reservoir-management strategies within Paonia Reservoir. This small reservoir fills to capacity each spring and requires approximately half of the snowmelt-runoff volume from its sediment-laden source waters, Muddy Creek. The U.S. Geological Survey is currently conducting high-resolution (15-minute data-recording interval) sediment monitoring to characterize incoming and outgoing sediment flux during reservoir operations at two sites on Muddy Creek. The high-resolution monitoring is being used to establish current rates of reservoir sedimentation, support USBR sediment transport and storage models, and assess the viability of water-storage recovery in Paonia Reservoir. These sites are equipped with in situ, single-frequency, side-looking acoustic Doppler current meters in conjunction with turbidity sensors to monitor sediment flux. This project serves as a demonstration of the capability of using surrogate techniques to predict suspended-sediment concentrations in small streams (less than 20 meters in width and 2 meters in depth). These two sites provide the ability to report near real-time suspended-sediment concentrations through the U.S. Geological Survey National Water Information System (NWIS) web interface and National Real-Time Water Quality websites (NRTWQ) to aid in reservoir operations and assessments.
Brusseau, M.L.; Mainhagu, J.; Morrison, C.; Carroll, K.C.
2015-01-01
Vapor-phase multi-stage contaminant mass discharge (CMD) tests were conducted at three field sites to measure mass discharge associated with contaminant sources located in the vadose zone. The three sites represent the three primary stages along the soil vapor extraction (SVE) operations lifecycle- pre/initial-SVE, mid-lifecycle, and near-closure. A CMD of 32 g/d was obtained for a site at which soil vapor SVE has been in operation for approximately 6 years, and for which mass removal is currently in the asymptotic stage. The contaminant removal behavior exhibited for the vapor extractions conducted at this site suggests that there is unlikely to be a significant mass of non-vapor-phase contaminant (e.g., DNAPL, sorbed phase) remaining in the advective domains, and that most remaining mass is likely located in poorly accessible domains. Given the conditions for this site, this remaining mass is hypothesized to be associated with the low-permeability (and higher water saturation) region in the vicinity of the saturated zone and capillary fringe. A CMD of 25 g/d was obtained for a site wherein SVE has been in operation for several years but concentrations and mass-removal rates are still relatively high. A CMD of 270 g/d was obtained for a site for which there were no prior SVE operations. The behavior exhibited for the vapor extractions conducted at this site suggest that non-vapor-phase contaminant mass (e.g., DNAPL) may be present in the advective domains. Hence, the asymptotic conditions observed for this site most likely derive from a combination of rate-limited mass transfer from DNAPL (and sorbed) phases present in the advective domain as well as mass residing in lower-permeability (“non-advective”) regions. The CMD values obtained from the tests were used in conjunction with a recently developed vapor-discharge tool to evaluate the impact of the measured CMDs on groundwater quality. PMID:26047819
Brusseau, M L; Mainhagu, J; Morrison, C; Carroll, K C
2015-08-01
Vapor-phase multi-stage contaminant mass discharge (CMD) tests were conducted at three field sites to measure mass discharge associated with contaminant sources located in the vadose zone. The three sites represent the three primary stages of the soil vapor extraction (SVE) operations lifecycle-pre/initial-SVE, mid-lifecycle, and near-closure. A CMD of 32g/d was obtained for a site at which soil vapor SVE has been in operation for approximately 6years, and for which mass removal is currently in the asymptotic stage. The contaminant removal behavior exhibited for the vapor extractions conducted at this site suggests that there is unlikely to be a significant mass of non-vapor-phase contaminant (e.g., DNAPL, sorbed phase) remaining in the advective domains, and that most remaining mass is likely located in poorly accessible domains. Given the conditions for this site, this remaining mass is hypothesized to be associated with the low-permeability (and higher water saturation) region in the vicinity of the saturated zone and capillary fringe. A CMD of 25g/d was obtained for a site wherein SVE has been in operation for several years but concentrations and mass-removal rates are still relatively high. A CMD of 270g/d was obtained for a site for which there were no prior SVE operations. The behavior exhibited for the vapor extractions conducted at this site suggest that non-vapor-phase contaminant mass (e.g., DNAPL) may be present in the advective domains. Hence, the asymptotic conditions observed for this site most likely derive from a combination of rate-limited mass transfer from DNAPL (and sorbed) phases present in the advective domain as well as mass residing in lower-permeability ("non-advective") regions. The CMD values obtained from the tests were used in conjunction with a recently developed vapor-discharge tool to evaluate the impact of the measured CMDs on groundwater quality. Copyright © 2015 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.; Yucel, V.; Desotell, L.
2006-07-01
The long-term safety of U.S. Department of Energy (DOE) low-level radioactive disposal facilities is assessed by conducting a performance assessment -- a systematic analysis that compares estimated risks to the public and the environment with performance objectives contained in DOE Manual 435.1-1, Radioactive Waste Management Manual. Before site operations, facilities design features such as final inventory, waste form characteristics, and closure cover design may be uncertain. Site operators need a modeling tool that can be used throughout the operational life of the disposal site to guide decisions regarding the acceptance of problematic waste streams, new disposal cell design, environmental monitoringmore » program design, and final site closure. In response to these needs the National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has developed a decision support system for the Area 5 Radioactive Waste Management Site in Frenchman Flat on the Nevada Test Site. The core of the system is a probabilistic inventory and performance assessment model implemented in the GoldSim{sup R} simulation platform. The modeling platform supports multiple graphic capabilities that allow clear documentation of the model data sources, conceptual model, mathematical implementation, and results. The combined models have the capability to estimate disposal site inventory, contaminant concentrations in environmental media, and radiological doses to members of the public engaged in various activities at multiple locations. The model allows rapid assessment and documentation of the consequences of waste management decisions using the most current site characterization information, radionuclide inventory, and conceptual model. The model is routinely used to provide annual updates of site performance, evaluate the consequences of disposal of new waste streams, develop waste concentration limits, optimize the design of new disposal cells, and assess the adequacy of environmental monitoring programs. (authors)« less
NASA Astrophysics Data System (ADS)
Kim, U.; Parker, J.
2016-12-01
Many dense non-aqueous phase liquid (DNAPL) contaminated sites in the U.S. are reported as "remediation in progress" (RIP). However, the cost to complete (CTC) remediation at these sites is highly uncertain and in many cases, the current remediation plan may need to be modified or replaced to achieve remediation objectives. This study evaluates the effectiveness of iterative stochastic cost optimization that incorporates new field data for periodic parameter recalibration to incrementally reduce prediction uncertainty and implement remediation design modifications as needed to minimize the life cycle cost (i.e., CTC). This systematic approach, using the Stochastic Cost Optimization Toolkit (SCOToolkit), enables early identification and correction of problems to stay on track for completion while minimizing the expected (i.e., probability-weighted average) CTC. This study considers a hypothetical site involving multiple DNAPL sources in an unconfined aquifer using thermal treatment for source reduction and electron donor injection for dissolved plume control. The initial design is based on stochastic optimization using model parameters and their joint uncertainty based on calibration to site characterization data. The model is periodically recalibrated using new monitoring data and performance data for the operating remediation systems. Projected future performance using the current remediation plan is assessed and reoptimization of operational variables for the current system or consideration of alternative designs are considered depending on the assessment results. We compare remediation duration and cost for the stepwise re-optimization approach with single stage optimization as well as with a non-optimized design based on typical engineering practice.
Hazardous Waste Cleanup: Dunkirk Acquisition Corporation in Dunkirk, New York
The entire site occupies approximately 90 acres on Willowbrook Avenue in the City of Dunkirk. It has been in operation since 1908, and has changed owners and names several times during the years. Currently, production facilities owned by Universal Stainles
47 CFR 15.31 - Measurement standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the installation site, such as perimeter protection systems, carrier current systems, and systems... variation of the input power or the radiated signal level of the fundamental frequency component of the... nominal rated supply voltage. For battery operated equipment, the equipment tests shall be performed using...
Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John R.
This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwatermore » [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.« less
Forced-air patient warming blankets disrupt unidirectional airflow.
Legg, A J; Hamer, A J
2013-03-01
We have recently shown that waste heat from forced-air warming blankets can increase the temperature and concentration of airborne particles over the surgical site. The mechanism for the increased concentration of particles and their site of origin remained unclear. We therefore attempted to visualise the airflow in theatre over a simulated total knee replacement using neutral-buoyancy helium bubbles. Particles were created using a Rocket PS23 smoke machine positioned below the operating table, a potential area of contamination. The same theatre set-up, warming devices and controls were used as in our previous study. This demonstrated that waste heat from the poorly insulated forced-air warming blanket increased the air temperature on the surgical side of the drape by > 5°C. This created convection currents that rose against the downward unidirectional airflow, causing turbulence over the patient. The convection currents increased the particle concentration 1000-fold (2 174 000 particles/m(3) for forced-air warming vs 1000 particles/m(3) for radiant warming and 2000 particles/m(3) for the control) by drawing potentially contaminated particles from below the operating table into the surgical site. Cite this article: Bone Joint J 2013;95-B:407-10.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2007-03-14
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period October 1 through December 31, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The first quarter comprises a total of 2,208 hours. For all fixed sites, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the first quarter of fiscal year (FY) 2007. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. NIM represents the AMF statistics for the current deployment in Niamey, Niger, Africa. PYE represents the AMF statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request an account on the local site data system. The eight research computers are located at the Barrow and Atqasuk sites; the SGP Central Facility; the TWP Manus, Nauru, and Darwin sites; the DMF at PNNL; and the AMF in Niger. This report provides the cumulative numbers of visitors and user accounts by site for the period January 1, 2006 - December 31, 2006. The U.S. Department of Energy requires national user facilities to report facility use by total visitor days-broken down by institution type, gender, race, citizenship, visitor role, visit purpose, and facility-for actual visitors and for active user research computer accounts. During this reporting period, the ACRF Archive did not collect data on user characteristics in this way. Work is under way to collect and report these data. Table 2 shows the summary of cumulative users for the period January 1, 2006 - December 31, 2006. For the first quarter of FY 2007, the overall number of users is up from the last reporting period. The historical data show that there is an apparent relationship between the total number of users and the 'size' of field campaigns, called Intensive Operation Periods (IOPs): larger IOPs draw more of the site facility resources, which are reflected by the number of site visits and site visit days, research accounts, and device accounts. These types of users typically collect and analyze data in near-real time for a site-specific IOP that is in progress. However, the Archive accounts represent persistent (year-to-year) ACRF data users that often mine from the entire collection of ACRF data, which mostly includes routine data from the fixed and mobile sites, as well as cumulative IOP data sets. Archive data users continue to show a steady growth, which is independent of the size of IOPs. For this quarter, the number of Archive data user accounts was 961, the highest since record-keeping began. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Although the AMF is not officially collecting data this quarter, personnel are regularly involved with teardown, packing, hipping, unpacking, setup, and maintenance activities, so they are included in the safety statistics. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period October 1 - December 31, 2006. There were no recordable or lost workdays or incidents for the first quarter of FY 2007.« less
NASA Astrophysics Data System (ADS)
Shimomura, Y.; Aymar, R.; Chuyanov, V. A.; Huguet, M.; Matsumoto, H.; Mizoguchi, T.; Murakami, Y.; Polevoi, A. R.; Shimada, M.; ITER Joint Central Team; ITER Home Teams
2001-03-01
ITER is planned to be the first fusion experimental reactor in the world operating for research in physics and engineering. The first ten years of operation will be devoted primarily to physics issues at low neutron fluence and the following ten years of operation to engineering testing at higher fluence. ITER can accommodate various plasma configurations and plasma operation modes, such as inductive high Q modes, long pulse hybrid modes and non-inductive steady state modes, with large ranges of plasma current, density, beta and fusion power, and with various heating and current drive methods. This flexibility will provide an advantage for coping with uncertainties in the physics database, in studying burning plasmas, in introducing advanced features and in optimizing the plasma performance for the different programme objectives. Remote sites will be able to participate in the ITER experiment. This concept will provide an advantage not only in operating ITER for 24 hours a day but also in involving the worldwide fusion community and in promoting scientific competition among the ITER Parties.
DAG telescope site studies and infrastructure for possible international co-operations
NASA Astrophysics Data System (ADS)
Yerli, Sinan K.; Yeşilyaprak, Cahit; Keskin, Onur; Alis, Sinan
2016-07-01
The selected site for the 4 m DAG (Eastern Anatolian Observatory in Turkish) telescope is at "Karakaya Ridge", at 3170 m altitude (3150 m after summit management). The telescope's optical design is performed by the DAG technical team to allow infrared observation at high angular resolution, with its adaptive optics system to be built in Turkey. In this paper; a brief introduction about DAG telescope design; planned instrumentation; the meteorological data collected from 2008, clear night counts, short-term DIMM observations; current infrastructure to hold auxiliary telescopes; auxiliary buildings to assist operations; the observatory design; and coating unit plans will be presented along with possible collaboration possibilities in terms of instrumentation and science programs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazardmore » areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.« less
High-Security Fencing for Rail Right-of-way Applications : Current Use and Best Practices.
DOT National Transportation Integrated Search
2015-10-01
The Volpe Center investigated how high-security fencing is used to prevent right-of-way (ROW) trespassing at several urban transit and commuter rail agencies in the United States. Interviews, operations documentation, and site visits were used to gat...
Mars Surface Systems Common Capabilities and Challenges for Human Missions
NASA Technical Reports Server (NTRS)
Toups, Larry; Hoffman, Stephen J.
2016-01-01
This paper describes the current status of common systems and operations as they are applied to actual locations on Mars that are representative of Exploration Zones (EZ) - NASA's term for candidate locations where humans could land, live and work on the Martian surface. Given NASA's current concepts for human missions to Mars, an EZ is a collection of Regions of Interest (ROIs) located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. An EZ also contains a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. The Evolvable Mars Campaign (EMC), a description of NASA's current approach to these human Mars missions, assumes that a single EZ will be identified within which NASA will establish a substantial and durable surface infrastructure that will be used by multiple human crews. The process of identifying and eventually selecting this single EZ will likely take many years to finalized. Because of this extended EZ selection process it becomes important to evaluate the current suite of surface systems and operations being evaluated for the EMC as they are likely to perform at a variety of proposed EZ locations and for the types of operations - both scientific and development - that are proposed for these candidate EZs. It is also important to evaluate proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC. Four locations identified in the Mars Exploration Program Analysis Group (MEPAG)'s Human Exploration of Mars Science Analysis Group (HEM-SAG) report are used in this paper as representative of candidate EZs that will emerge from the selection process that NASA has initiated. A field station site plan is developed for each of these four HEM-SAG sites. Because of the difficulty in getting equipment and supplies to the surface of Mars, specific assessments have been conducted to identify those systems and processes that can perform in multiple, sometimes completely unrelated, situations. Examples of common systems that are assessed at all of these sites include: (a) habitation and associated logistics storage systems, (b) a centralized power plant capable of supplying power to a geographically distributed (but within the central habitation zone) set of systems, (c) mobility systems that can be used to off-load and move payloads to specific locations at the central field station location that could also be used to traverse long distances to reach some of the more remote ROIs and (d) robotic systems that can support various activities (such as system set up and maintenance) at the field station that could also be used to explore scientific ROIs and used to support site-specific ISRU (In Situ Resource Utilization) production activities.
Reclamation of sanitary landfills: A case study in Shelby County, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
Riddick, P.M.; Kirsch, S.; Kung, Hsiang-Te
1992-07-01
Approximately 30,000 sanitary landfills were in operation in the United States in 1976; today, there are <7,000. The remaining 23,000 closed sites can be reclaimed to actually enhance the surrounding community; cost is the only limiting factor. Abandoned sanitary landfill sites do have problems, namely leachates, methane build-up, and subsidence. However, with modern techniques and planning, these problems can be overcome. Across the nation, old landfills have been converted into golf courses, parks, ski resorts, libraries, and even methane power plants. In some cases, a community's property value has actually increased after reclamation of the local landfill. Shelby County, inmore » southwestern Tennessee, currently has four closed sanitary landfills. Only one site has been fully utilized as a recreational facility. At this site, four soccer fields are home to over 150 league soccer teams. Two sites are home to airplane radio-control clubs, although most land at these sites is currently unused. The fourth site is completely unused and up for sale. All of these closed sanitary landfills have potential use as recreation areas, but, as is often the case, lack of money and initiative is preventing development. 7 refs.« less
Fetter, J G; Benditt, D G; Stanton, M S
1996-08-01
This study was designed to determine the susceptibility of an implanted cardioverter-defibrillator to electromagnetic interference in an electrically hostile work site environment, with the ultimate goal of allowing the patient to return to work. Normal operation of an implanted cardioverter-defibrillator depends on reliable sensing of the heart's electrical activity. Consequently, there is concern that external electromagnetic interference from external sources in the work place, especially welding equipment or motor-generator systems, may be sensed and produce inappropriate shocks or abnormal reed switch operation, temporarily suspending detection of ventricular tachycardia or ventricular fibrillation. The effects of electromagnetic interference on the operation of one type of implantable cardioverter-defibrillator (Medtronic models 7217 and 7219) was measured by using internal event counter monitoring in 10 patients operating arc welders at up to 900 A or working near 200-hp motors and 1 patient close to a locomotive starter drawing up to 400 A. The electromagnetic interference produced two sources of potential interference on the sensing circuit or reed switch operation, respectively: 1) electrical fields with measured frequencies up to 50 MHz produced by the high currents during welding electrode activation, and 2) magnetic fields produced by the current in the welding electrode and cable. The defibrillator sensitivity was programmed to the highest (most sensitive) value: 0.15 mV (model 7219) or 0.3 mV (model 7217). The ventricular tachycardia and ventricular fibrillation therapies were temporarily turned off but the detection circuits left on. None of the implanted defibrillators tested were affected by oversensing of the electric field as verified by telemetry from the detection circuits. The magnetic field from 225-A welding current produced a flux density of 1.2 G; this density was not adequate to close the reed switch, which requires approximately 10 G. Our testing at the work site revealed no electrical interference with this type of defibrillator. Patients were allowed to return to work. The following precautions should be observed by the patient: 1) maintain a minimal distance of 2 ft (61 cm) from the welding arc and cables or large motors, 2) do not exceed tested currents with the welding equipment, 3) wear insulated gloves while operating electrical equipment, 4) verify that electrical equipment is properly grounded, and 5) stop welding and leave the work area immediately if a therapy is delivered or a feeling of lightheadedness is experienced.
NV/YMP radiological control manual, Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gile, A.L.
The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste andmore » the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.« less
NASA Technical Reports Server (NTRS)
Bennington, Donald R. (Inventor); Crawford, Daniel J. (Inventor)
1990-01-01
The invention is a clock for synchronizing operations within a high-speed, distributed data processing network. The clock is actually a distributed system comprising a central clock and multiple site clock interface units (SCIUs) which are connected by means of a fiber optic star network and which operate under control of separate clock software. The presently preferred embodiment is a part of the flight simulation system now in current use at the NASA Langley Research Center.
Quantitative Investigation of Room-Temperature Breakdown Effects in Pixelated TlBr Detectors
NASA Astrophysics Data System (ADS)
Koehler, Will; He, Zhong; Thrall, Crystal; O'Neal, Sean; Kim, Hadong; Cirignano, Leonard; Shah, Kanai
2014-10-01
Due to favorable material properties such as high atomic number (Tl: 81, Br: 35), high density ( 7.56 g/cm3), and a wide band gap (2.68 eV), thallium-bromide (TlBr) is currently under investigation for use as an alternative room-temperature semiconductor gamma-ray spectrometer. TlBr detectors can achieve less than 1% FWHM energy resolution at 662 keV, but these results are limited to stable operation at - 20°C. After days to months of room-temperature operation, ionic conduction causes these devices to fail. This work correlates the varying leakage current with alpha-particle and gamma-ray spectroscopic performances at various operating temperatures. Depth-dependent photopeak centroids exhibit time-dependent transient behavior, which indicates trapping sites form near the anode surface during room-temperature operation. After refabrication, similar performance and functionality of failed detectors returned.
Photovoltaic array: Power conditioner interface characteristics
NASA Technical Reports Server (NTRS)
Gonzalez, C. C.; Hill, G. M.; Ross, R. G., Jr.
1982-01-01
The electrical output (power, current, and voltage) of flat plate solar arrays changes constantly, due primarily to changes in cell temperature and irradiance level. As a result, array loads such as dc-to-ac power conditioners must be capable of accommodating widely varying input levels while maintaining operation at or near the maximum power point of the array. The array operating characteristics and extreme output limits necessary for the systematic design of array load interfaces under a wide variety of climatic conditions are studied. A number of interface parameters are examined, including optimum operating voltage, voltage energy, maximum power and current limits, and maximum open circuit voltage. The effect of array degradation and I-V curve fill factor or the array power conditioner interface is also discussed. Results are presented as normalized ratios of power conditioner parameters to array parameters, making the results universally applicable to a wide variety of system sizes, sites, and operating modes.
NASA Astrophysics Data System (ADS)
Wu, Yunna; Chen, Kaifeng; Xu, Hu; Xu, Chuanbo; Zhang, Haobo; Yang, Meng
2017-12-01
There is insufficient research relating to offshore wind farm site selection in China. The current methods for site selection have some defects. First, information loss is caused by two aspects: the implicit assumption that the probability distribution on the interval number is uniform; and ignoring the value of decision makers' (DMs') common opinion on the criteria information evaluation. Secondly, the difference in DMs' utility function has failed to receive attention. An innovative method is proposed in this article to solve these drawbacks. First, a new form of interval number and its weighted operator are proposed to reflect the uncertainty and reduce information loss. Secondly, a new stochastic dominance degree is proposed to quantify the interval number with a probability distribution. Thirdly, a two-stage method integrating the weighted operator with stochastic dominance degree is proposed to evaluate the alternatives. Finally, a case from China proves the effectiveness of this method.
UV disinfection pilot plant study at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huffines, R.L.; Beavers, B.A.
1993-05-01
An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfectionmore » process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.« less
UV disinfection pilot plant study at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huffines, R.L.; Beavers, B.A.
1993-01-01
An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfectionmore » process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.« less
A Constrained and Versioned Data Model for TEAM Data
NASA Astrophysics Data System (ADS)
Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.
2009-04-01
The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. At each TEAM Site, data is gathered as defined by the protocols and according to a predefined sampling schedule. The TEAM data is organized and stored in a database based on the TEAM spatio-temporal data model. This data model is at the core of the TEAM Information System - it consumes and executes spatio-temporal queries, and analytical functions that are performed on TEAM data, and defines the object data types, relationships and operations that maintain database integrity. The TEAM data model contains object types including types for observation objects (e.g. bird, butterfly and trees), sampling unit, person, role, protocol, site and the relationship of these object types. Each observation data record is a set of attribute values of an observation object and is always associated with a sampling unit, an observation timestamp or time interval, a versioned protocol and data collectors. The operations on the TEAM data model can be classified as read operations, insert operations and update operations. Following are some typical operations: The operation get(site, protocol, [sampling unit block, sampling unit,] start time, end time) returns all data records using the specified protocol and collected at the specified site, block, sampling unit and time range. The operation insertSamplingUnit(sampling unit, site, protocol) saves a new sampling unit into the data model and links it with the site and protocol. The operation updateSampligUnit(sampling_unit_id, attribute, value) changes the attribute (e.g. latitude or longitude) of the sampling unit to the specified value. The operation insertData(observation record, site, protocol, sampling unit, timestamps, data collectors) saves a new observation record into the database and associates it with specified objects. The operation updateData(protocol, data_id, attribute, value) modifies the attribute of an existing observation record to the specified value. All the insert or update operations require: 1) authorization to ensure the user has necessary privileges to perform the operation; 2) timestamp validation to ensure the observation timestamps are in the designated time range specified in the sampling schedule; 3) data validation to check that the data records use correct taxonomy terms and data values. No authorization is performed for get operations, but under some specific condition, a username may be required for the purpose of authentication. Along with the validations above, the TEAM data model also supports human based data validation on observed data through the Data Review subsystem to ensure data quality. The data review is implemented by adding two attributes review_tag and review_comment to each observation data record. The attribute review_tag is used by a reviewer to specify the quality of data, and the attribute review_comment is for reviewers to give more information when a problem is identified. The review_tag attribute can be populated by either the system conducting QA/QC tests or by pre-specified scientific experts. The following is the review operation, which is actually a special case of the operation updateData: The operation updateReview(protocol, data_id, judgment, comment) sets the attribute review_tag and review_comment to the specified values. By systematically tracking every step, The TEAM data model can roll back to any previous state. This is achieved by introducing a historical data container for each editable object type. When the operation updateData is applied to an object to modify its attribute, the object will be tagged with the current timestamp and the name of the user who conducts the operation, the tagged object will then be moved into the historical data container, and finally a new object will be created with the new value for the specified attribute. The diagram illustrates the architecture of the TEAM data management system. A data collector can use the Data Ingestion subsystem to load new data records into the TEAM data model. The system establishes a first level of review (i.e. meets minimum data standards via QA/QC tests). Further review is done via experts and they can verify and provide their comments on data records through the Data Review subsystem. The data editor can then address data records based on the reviewer's comments. Users can use the Data Query and Download application to find data by sites, protocols and time ranges. The Data Query and Download system packages selected data with the data license and important metadata information into a single package and delivers it to the user.
EPA MOBILE INCINERATION SYSTEM MODIFICATIONS, TESTING AND OPERATIONS - FEBRUARY 1986 TO JUNE 1989
The report covers the field demonstration activities of the U.S. Environmental Protection Agency's Mobile Incineration System (MIS) from February 1986 to June 1989 at the Denney Farm Site, Missouri. The activities discussed in the current report include: modifications made to the...
Mars Surface System Common Capabilities and Challenges for Human Missions
NASA Technical Reports Server (NTRS)
Hoffman, Stephen J.; Toups, Larry
2016-01-01
NASA has begun a process to identify and evaluate candidate locations where humans could land, live and work on the martian surface. These locations are referred to as Exploration Zones (EZs). Given current mission concepts, an EZ is a collection of Regions of Interest (ROIs) that are located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains a landing site and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. In parallel with this process, NASA continues to make progress on the Evolvable Mars Campaign examining alternatives that can pioneer an extended human presence on Mars that is Earth independent. This involves ongoing assessments of surface systems and operations to enable a permanent, sustainable human presence. Because of the difficulty in getting equipment and supplies to the surface of Mars, part of these assessments involve identifying those systems and processes that can perform in multiple, sometimes completely unrelated, situations. These assessments have been performed in a very generic surface mission carried out at a very generic surface location. As specific candidate EZs are identified it becomes important to evaluate the current suite of surface systems and operations as they are likely to perform for the specific locations and for the types of operations - both scientific and development - that are proposed for these EZs. It is also important to evaluate the proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC. This means looking at setting up and operating a field station at a central location within the EZ as well as traversing to and exploring the scientific ROIs within the boundaries of the EZ. The proposed paper will describe the current status of common systems and operations as they can be applied to actual EZ locations on Mars. Initially these EZs will be the four locations identified MEPAG's Human Exploration of Mars Science Analysis Group (HEM-SAG) that will be used as representative of the EZs that will emerge from the process that NASA has initiated. An example process that could be commonly applied is an approach for developing a field station site plan that would be demonstrated by applying this process to each of the four HEM-SAG sites. Examples of common systems include (a) mobility systems that can be used to off-load and move payloads to specific locations at the central field station location that could also be used to traverse long distances to reach some of the more remote ROIs or (b) robotic systems that can support various activities (such as system set up and maintenance) at the field station that could also be used to explore scientific ROIs and used to support site-specific ISRU production activities.
Inter-operator and inter-device agreement and reliability of the SEM Scanner.
Clendenin, Marta; Jaradeh, Kindah; Shamirian, Anasheh; Rhodes, Shannon L
2015-02-01
The SEM Scanner is a medical device designed for use by healthcare providers as part of pressure ulcer prevention programs. The objective of this study was to evaluate the inter-rater and inter-device agreement and reliability of the SEM Scanner. Thirty-one (31) volunteers free of pressure ulcers or broken skin at the sternum, sacrum, and heels were assessed with the SEM Scanner. Each of three operators utilized each of three devices to collect readings from four anatomical sites (sternum, sacrum, left and right heels) on each subject for a total of 108 readings per subject collected over approximately 30 min. For each combination of operator-device-anatomical site, three SEM readings were collected. Inter-operator and inter-device agreement and reliability were estimated. Over the course of this study, more than 3000 SEM Scanner readings were collected. Agreement between operators was good with mean differences ranging from -0.01 to 0.11. Inter-operator and inter-device reliability exceeded 0.80 at all anatomical sites assessed. The results of this study demonstrate the high reliability and good agreement of the SEM Scanner across different operators and different devices. Given the limitations of current methods to prevent and detect pressure ulcers, the SEM Scanner shows promise as an objective, reliable tool for assessing the presence or absence of pressure-induced tissue damage such as pressure ulcers. Copyright © 2015 Bruin Biometrics, LLC. Published by Elsevier Ltd.. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-01-01
This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-controlmore » and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.« less
NASA Astrophysics Data System (ADS)
Gong, X.; Wu, Q.
2017-12-01
Network virtual instrument (VI) is a new development direction in current automated test. Based on LabVIEW, the software and hardware system of VI used for emission spectrum of pulsed high-voltage direct current (DC) discharge is developed and applied to investigate pulsed high-voltage DC discharge of nitrogen. By doing so, various functions are realized including real time collection of emission spectrum of nitrogen, monitoring operation state of instruments and real time analysis and processing of data. By using shared variables and DataSocket technology in LabVIEW, the network VI system based on field VI is established. The system can acquire the emission spectrum of nitrogen in the test site, monitor operation states of field instruments, realize real time face-to-face interchange of two sites, and analyze data in the far-end from the network terminal. By employing the network VI system, the staff in the two sites acquired the same emission spectrum of nitrogen and conducted the real time communication. By comparing with the previous results, it can be seen that the experimental data obtained by using the system are highly precise. This implies that the system shows reliable network stability and safety and satisfies the requirements for studying the emission spectrum of pulsed high-voltage discharge in high-precision fields or network terminals. The proposed architecture system is described and the target group gets the useful enlightenment in many fields including engineering remote users, specifically in control- and automation-related tasks.
The PACE evaluation: initial findings.
Branch, L G; Coulam, R F; Zimmerman, Y A
1995-06-01
As of mid-1994 there were nine replications of the On Lok model operating under dual capitation payments as sites in the Program of All-inclusive Care for the Elderly (PACE). A tenth site had begun operating under capitation, but was unable to remain viable. The present descriptive study documents the growth and development of the first seven of these sites, all that had been operating under capitation during 1992. Comparisons among these sites and with On Lok are presented in the areas of organizational structure, client characteristics, approaches to case management, service delivery options, and financing. There is considerable variability in the implementation of the PACE model. Combined Medicare and Medicaid capitation monthly payments range from $2,147 to $5,973. These seven PACE sites (excluding On Lok) served a total of 888 current clients at the end of 1992, after a cumulative 136 months of experience under capitation. The very slow enrollment rates may imply that the target clients are less enthusiastic about this model than are its architects. The client selection process may suggest niche-marketing or skimming, but not the full representation of the nursing home population in their states. Given both the slow enrollment and the niche-marketing (the benevolent term) or skimming (the pejorative term) that has occurred, caution about the long-term viability of the PACE model may be warranted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-09-21
The Doepke Disposal (Holliday) site is an inactive industrial-waste landfill located east of Holliday, Johnson County, Kansas. During the 1950s and early 1960s the site was used as a landfill for residential refuse. In 1963 Doepke Disposal Service, Inc. leased the property and operated a commercial and industrial waste landfill until 1970, when the State shut down the operation. Materials such as fiberglass, fiberglass resins, paint sludges, spent solvents, metal sludges, soaps, and pesticides were reportedly disposed of at the landfill. In 1966 fire debris and up to 374 drums of solvents and organochlorine and organophosphate pesticides were disposed ofmore » at the site as a result of a fire at a Kansas City chemical plant. Initially wastes and residues brought to the site were burned, however, in the late 1960s burning operations ceased and solid wastes were buried onsite and liquids were disposed of in two surface impoundments. In 1977 rock material excavated during the construction of an interstate was dumped onsite and in some cases over the deposited waste. The current owner uses portions of the site for storage of clay, crushed shales, and crushed limestone. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, toluene, and xylene; other organics including PAHs, PCBs, and pesticides, and metals including chromium and lead.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2006-09-30
This annual report describes the environmental monitoring programs related to the Department of Energy’s (DOE) activities at the Santa Susana Field Laboratory (SSFL) facility located in Ventura County, California during 2005. Part of the SSFL facility, known as Area IV, had been used for DOE’s activities since the 1950s. A broad range of energy related research and development (R&D) projects, including nuclear technologies projects, was conducted at the site. All the nuclear R&D operations in Area IV ceased in 1988. Current efforts are directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and closure of facilities used formore » liquid metal research.« less
Collins, Brian D.; Corbett, Skye C.; Sankey, Joel B.; Fairley, Helen C.
2014-01-01
Along the Colorado River corridor between Glen Canyon Dam and Lees Ferry, Arizona, located some 25 km downstream from the dam, archaeological sites dating from 8,000 years before present through the modern era are located within and on top of fluvial and alluvial terraces of the prehistorically undammed river. These terraces are known to have undergone significant erosion and retreat since emplacement of Glen Canyon Dam in 1963. Land managers and policy makers associated with managing the flow of the Colorado River are interested in understanding how the operations of Glen Canyon Dam have affected the archeological sites associated with these terraces and how dam-controlled flows currently interact with other landscape-shaping processes. In 2012, the U.S. Geological Survey initiated a research project in Glen Canyon to study the types and causes of erosion of the terraces. This report provides the first step towards this understanding by presenting comparative analyses on several types of high-resolution topographic data (airborne lidar, terrestrial lidar, and airborne photogrammetry) that can be used in the future to document and analyze changes to terrace-based archaeological sites. Herein, we present topographic and geomorphologic data of four archaeological sites within a 14 km segment of Glen Canyon using each of the three data sources. In addition to comparing each method’s suitability for adequately representing the topography of the sites, we also analyze the data within each site’s context and describe the geomorphological processes responsible for erosion. Our results show that each method has its own strengths and weaknesses, and that terrestrial and airborne lidar are essentially interchangeable for many important topographic characterization and monitoring purposes. However, whereas terrestrial lidar provides enhanced capacity for feature recognition and gully morphology delineation, airborne methods (whether by way of laser or optical sensors) are better suited for reach- and regional-scale mapping. Our site-specific geomorphic analyses of the four archeological sites indicate that their current topographical conditions are a result of different and sometimes competing erosional agents, including bedrock- and terrace-based overland flow, fluvial-induced terrace bank collapse, and alluvial-fan-generated debris flows. Although the influences of anthropogenic-induced erosion from dam operations are not specifically analyzed in this report, we do identify geomorphic settings where dam operations are either more or less likely to affect archeological site stability. This information can be used to assist with future monitoring efforts of these sites and identification of similar conditions for other archeological sites along the Colorado River corridor in Glen Canyon.
Modelling and operation strategies of DLR's large scale thermocline test facility (TESIS)
NASA Astrophysics Data System (ADS)
Odenthal, Christian; Breidenbach, Nils; Bauer, Thomas
2017-06-01
In this work an overview of the TESIS:store thermocline test facility and its current construction status will be given. Based on this, the TESIS:store facility using sensible solid filler material is modelled with a fully transient model, implemented in MATLAB®. Results in terms of the impact of filler site and operation strategies will be presented. While low porosity and small particle diameters for the filler material are beneficial, operation strategy is one key element with potential for optimization. It is shown that plant operators have to ponder between utilization and exergetic efficiency. Different durations of the charging and discharging period enable further potential for optimizations.
SAMO (Sistema de Apoyo Mechanizado a la Operacion): An operational aids computer system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stormer, T.D.; Laflor, E.V.
1989-01-01
SAMO (Sistema de Apoyo Mechanizado a la Operacion) is a sensor-driven, computer-based, graphic display system designed by Westinghouse to aid the A. N. Asco operations staff during all modes of plant operations, including emergencies. The SAMO system is being implemented in the A. N. Asco plant in two phases that coincide with consecutive refueling outages for each of two nuclear units at the Asco site. Phase 1 of the SAMO system implements the following functions: (1) emergency operational aids, (2) postaccident monitoring, (3) plant graphics display, (4) high-speed transient analysis recording, (5) historical data collection, storage, and retrieval, (6) sequencemore » of events, and (7) posttrip review. During phase 2 of the SAMO project, the current plant computer will be removed and the functions now performed by the plant computer will be performed by the SAMO system. In addition, the following functions will be implemented: (1) normal and simple transients operational aid, (2) plant information graphics; and (3) real-time radiological off-site dose calculation.« less
COST MODEL FOR LARGE URBAN SCHOOLS.
ERIC Educational Resources Information Center
O'BRIEN, RICHARD J.
THIS DOCUMENT CONTAINS A COST SUBMODEL OF AN URBAN EDUCATIONAL SYSTEM. THIS MODEL REQUIRES THAT PUPIL POPULATION AND PROPOSED SCHOOL BUILDING ARE KNOWN. THE COST ELEMENTS ARE--(1) CONSTRUCTION COSTS OF NEW PLANTS, (2) ACQUISITION AND DEVELOPMENT COSTS OF BUILDING SITES, (3) CURRENT OPERATING EXPENSES OF THE PROPOSED SCHOOL, (4) PUPIL…
Hazardous Waste Cleanup: Central Hudson Gas & Electric Corporation in Highland, New York
This site is located about five miles west of the Hudson River in Town of Lloyd, New York, Ulster County. It has operated as a vehicle and equipment storage and repair facility for an electric power transmission company since the 1950's. Both current
Natural Phenomena Hazards Design Criteria and Other Characterization Information for the MFFF at SRS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wyatt, D.E.
This report is a comprehensive complication applicable to the general Savannah River Site area, developed by both the original contractor, the DuPont Company, and by the current plant operator, Westinghouse Savannah River Company, over the full plant lifetime period (1950 - 2000).
STK Integrated Message Production List Editor (SIMPLE) for CEO Operations
NASA Technical Reports Server (NTRS)
Trenchard, Mike; Heydorn, James
2014-01-01
Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.
From Reader to Writer: Citizen Journalism as News Produsage
NASA Astrophysics Data System (ADS)
Bruns, Axel
Today, participatory or citizen journalism - journalism which enables readers to become writers - exists online and offline in a variety of forms and formats, operates under a number of editorial schemes, and focuses on a wide range of topics from the specialist to the generic and the micro-local to the global. Key models in this phenomenon include veteran sites Slashdot and Indymedia, as well as news-related weblogs; more recent additions into the mix have been the South Korean OhmyNews, which in 2003 was “the most influential online news site in that country, attracting an estimated 2 million readers a day” (Gillmor, 2003a, p. 7), with its new Japanese and international offshoots, as well as the Wikipedia with its highly up-to-date news and current events section and its more recent offshoot Wikinews, and even citizen-produced video news as it is found in sites such as YouTube and Current.tv.
IODP Expedition 338: NanTroSEIZE Stage 3: NanTroSEIZE plate boundary deep riser 2
NASA Astrophysics Data System (ADS)
Moore, G. F.; Kanagawa, K.; Strasser, M.; Dugan, B.; Maeda, L.; Toczko, S.
2014-01-01
The Nankai Trough Seismogenic Zone Experiment (NanTroSEIZE) is designed to investigate fault mechanics and seismogenesis along a subduction megathrust, with objectives that include characterizing fault slip, strain accumulation, fault and wall rock composition, fault architecture, and state variables throughout an active plate boundary system. Integrated Ocean Drilling Program (IODP) Expedition 338 was planned to extend and case riser Hole C0002F from 856 to 3600 meters below the seafloor (m b.s.f.). Riser operations extended the hole to 2005.5 m b.s.f., collecting logging-while-drilling (LWD) and measurement-while-drilling, mud gas, and cuttings data. Results reveal two lithologic units within the inner wedge of the accretionary prism that are separated by a prominent fault zone at ~ 1640 m b.s.f. Due to damage to the riser during unfavorable winds and strong currents, riser operations were suspended, and Hole C0002F left for re-entry during future riser drilling operations. Contingency riserless operations included coring at the forearc basin site (C0002) and at two slope basin sites (C0021 and C0022), and LWD at one input site (C0012) and at three slope basin sites (C0018, C0021 and C0022). Cores and logs from these sites comprehensively characterize the alteration stage of the oceanic basement input to the subduction zone, the early stage of Kumano Basin evolution, gas hydrates in the forearc basin, and recent activity of the shallow megasplay fault zone system and associated submarine landslides.
A low cost, high performance remotely controlled backhoe/excavator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rizzo, J.
1995-12-31
This paper addresses a state of the art, low cost, remotely controlled backhoe/excavator system for remediation use at hazardous waste sites. The all weather, all terrain, Remote Dig-It is based on a simple, proven construction platform and incorporates state of the art sensors, control, telemetry and other subsystems derived from advanced underwater remotely operated vehicle systems. The system can be towed to a site without the use of a trailer, manually operated by an on board operator or operated via a fiber optic or optional RF communications link by a remotely positioned operator. A proportional control system is piggy backedmore » onto the standard manual control system. The control system improves manual operation, allows rapid manual/remote mode selection and provides fine manual or remote control of all functions. The system incorporates up to 4 separate video links, acoustic obstacle proximity sensors, and stereo audio pickups and an optional differential GPS navigation. Video system options include electronic panning and tilting within a distortion-corrected wide angle field of view. The backhoe/excavator subsystem has a quick disconnect interface feature which allows its use as a manipulator with a wide variety of end effectors and tools. The Remote Dig-It was developed to respond to the need for a low-cost, effective remediation system for use at sites containing hazardous materials. The prototype system was independently evaluated for this purpose by the Army at the Jefferson Proving Ground where it surpassed all performance goals. At the time of this writing, the Remote Dig-It system is currently the only backhoe/excavator which met the Army`s goals for remediation systems for use at hazardous waste sites and it costs a fraction of any known competing offerings.« less
Nevada National Security Site Radiological Control Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Radiological Control Managers’ Council
2012-03-26
This document supersedes DOE/NV/25946--801, 'Nevada Test Site Radiological Control Manual,' Revision 1 issued in February 2010. Brief Description of Revision: A complete revision to reflect a recent change in name for the NTS; changes in name for some tenant organizations; and to update references to current DOE policies, orders, and guidance documents. Article 237.2 was deleted. Appendix 3B was updated. Article 411.2 was modified. Article 422 was re-written to reflect the wording of DOE O 458.1. Article 431.6.d was modified. The glossary was updated. This manual contains the radiological control requirements to be used for all radiological activities conducted bymore » programs under the purview of the U.S. Department of Energy (DOE) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection.' Programs covered by this manual are located at the Nevada National Security Site (NNSS); Nellis Air Force Base and North Las Vegas, Nevada; Santa Barbara and Livermore, California; and Andrews Air Force Base, Maryland. In addition, fieldwork by NNSA/NSO at other locations is covered by this manual. Current activities at NNSS include operating low-level radioactive and mixed waste disposal facilities for United States defense-generated waste, assembly and execution of subcritical experiments, assembly/disassembly of special experiments, the storage and use of special nuclear materials, performing criticality experiments, emergency responder training, surface cleanup and site characterization of contaminated land areas, environmental activity by the University system, and nonnuclear test operations, such as controlled spills of hazardous materials at the Hazardous Materials Spill Center. Currently, the major potential for occupational radiation exposure is associated with the burial of low-level radioactive waste and the handling of radioactive sources. Remediation of contaminated land areas may also result in radiological exposures.« less
[The place of vascular surgery in the treatment of cancer patients].
Gaibov, A D; Zikiriakhodzhaev, D Z; Sultanov, D D; Karimova, N R
2004-01-01
The aim of the present work was to analyze the reported data related to the diagnostic potential of delineating the degree of blood vessel involvement into the tumorous process in patients with cancer diseases of varying sites and to the choice of the method for surgical treatment of this group patients. Half century ago an idea was advanced of the necessity of performing vascular operations during evacuation of tumors of certain sites. Based on the analysis of numerous publications the authors have established that the lowering of the lethality and improvement of the quality of life in patients with oncopathology are determined in many respects by one-stage operations performed on the great vessels, allowing to broaden the indications for tumor resection. The review elucidates the current achievements of vascular surgery linked with oncology, mirrors the historical viewpoint of the given problem, describes an experience of different authors gained with the use of the modern noninvasive research modalities in the diagnosis of vascular involvement into tumorous growth. As dependent on the site, tumor morphology and hemodynamic significance of the affected vascular segment, the indications have been worked out for different types of operations on the arteries and veins. The authors emphasize the potential and safety of great vessel ligation after radical resection of tumors of certain sites.
EDOS Evolution to Support NASA Future Earth Sciences Missions
NASA Technical Reports Server (NTRS)
Cordier, Guy R.; McLemore, Bruce; Wood, Terri; Wilkinson, Chris
2010-01-01
This paper presents a ground system architecture to service future NASA decadal missions and in particular, the high rate science data downlinks, by evolving EDOS current infrastructure and upgrading high rate network lines. The paper will also cover EDOS participation to date in formulation and operations concepts for the respective missions to understand the particular mission needs and derived requirements such as data volumes, downlink rates, data encoding, and data latencies. Future decadal requirements such as onboard data recorder management and file protocols drive the need to emulate these requirements within the ground system. The EDOS open system modular architecture is scalable to accommodate additional missions using the current sites antennas and future sites as well and meet the data security requirements and fulfill mission's objectives
Physical oceanographic data from the OTEC Punta Tuna, Puerto Rico Site, September 1979-June 1980
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frye, D.; Davison, A.; Leavitt, K.
1981-01-01
The first results of an oceanographic measurement program being conducted off the southeast corner of Puerto Rico are presented. The study site is a proposed OTEC site and is located about 20 km off Punta Tuna. The objectives of the measurement program are to document the physical oceanography of the site as related to the engineering and environmental factors involved in OTEC design and operation. Oceanographic measurements include: (1) a subsurface mooring instrumented with five current, temperature, and pressure recorders; and (2) quarterly hydrographic cruises to measure salinity, temperature, and depth profiles on a grid of 33 stations in themore » vicinity of the mooring site. The first cruise, conducted between 16 and 21 June 1980, included the initial mooring deployment and a CTD (conductivity, temperature, and depth) and XBT (expendable bathythermograph) survey. The CTD/XBT measurements are presented. Also included are results of in situ current, temperature, and pressure measurements made during two previous programs. In September 1979, Coastal Marine Research (CMR) deployed a mooring at approximately the same site as the present mooring. Results from three of these instruments are included. The Naval Underwater Systems Center deployed a mooring at this site in February 1979 and partial results from one instrument on this mooring are also presented. (WHK)« less
Sneve, M K; Kiselev, M; Shandala, N K
2014-05-01
The Norwegian Radiation Protection Authority has been implementing a regulatory cooperation program in the Russian Federation for over 10 years, as part of the Norwegian government's Plan of Action for enhancing nuclear and radiation safety in northwest Russia. The overall long-term objective has been the enhancement of safety culture and includes a special focus on regulatory supervision of nuclear legacy sites. The initial project outputs included appropriate regulatory threat assessments, to determine the hazardous situations and activities which are most in need of enhanced regulatory supervision. In turn, this has led to the development of new and updated norms and standards, and related regulatory procedures, necessary to address the often abnormal conditions at legacy sites. This paper presents the experience gained within the above program with regard to radio-ecological characterization of Sites of Temporary Storage for spent nuclear fuel and radioactive waste at Andreeva Bay and Gremikha in the Kola Peninsula in northwest Russia. Such characterization is necessary to support assessments of the current radiological situation and to support prospective assessments of its evolution. Both types of assessments contribute to regulatory supervision of the sites. Accordingly, they include assessments to support development of regulatory standards and guidance concerning: control of radiation exposures to workers during remediation operations; emergency preparedness and response; planned radionuclide releases to the environment; development of site restoration plans, and waste treatment and disposal. Examples of characterization work are presented which relate to terrestrial and marine environments at Andreeva Bay. The use of this data in assessments is illustrated by means of the visualization and assessment tool (DATAMAP) developed as part of the regulatory cooperation program, specifically to help control radiation exposure in operations and to support regulatory analysis of management options. For assessments of the current radiological situation, the types of data needed include information about the distribution of radionuclides in environmental media. For prognostic assessments, additional data are needed about the landscape features, on-shore and off-shore hydrology, geochemical properties of soils and sediments, and possible continuing source terms from continuing operations and on-site disposal. It is anticipated that shared international experience in legacy site characterization can be useful in the next steps. Although the output has been designed to support regulatory evaluation of these particular sites in northwest Russia, the methods and techniques are considered useful examples for application elsewhere, as well as providing relevant input to the International Atomic Energy Agency's international Working Forum for the Regulatory Supervision of Legacy Sites. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, J. P.; Pastor, R. S.
2002-02-28
The West Valley Demonstration Project (WVDP) has successfully pretreated and vitrified nearly all of the 600,000 gallons of liquid high-level radioactive waste that was generated at the site of the only commercial nuclear fuel reprocessing plant to have operated in the United States. Low-level waste (LLW) generated during the course of the cleanup effort now requires disposal. Currently the WVDP only ships Class A LLW for off-site disposal. It has been shipping Class A wastes to Envirocare of Utah, Inc. since 1997. However, the WVDP may also have a future need to ship Class B and Class C waste, whichmore » Envirocare is not currently authorized to accept. The Nevada Test Site (NTS), a U.S. Department of Energy (DOE) facility, can accept all three waste classifications. The WVDP set a goal to receive certification to begin shipping Class A wastes to NTS by 2001. Formal certification/approval was granted by the DOE Nevada Operations Office on July 12, 2001. This paper discusses how the WVDP contractor, West Valley Nuclear Services Company (WVNSCO), completed the activities required to achieve NTS certification in 2001 to ship waste to its facility. The information and lessons learned provided are significant because the WVDP is the only new generator receiving certification based on an NTS audit in January 2001 that resulted in no findings and only two observations--a rating that is unparalleled in the DOE Complex.« less
Zaid, Harras B; Kaffenberger, Samuel D; Chang, Sam S
2013-04-01
For radical cystectomy, historical practice trends have favored the use of preoperative bowel preparations to reduce complications, including surgical site infections, ileus, and anastomotic leaks. However, emerging data has questioned this practice. Postoperative cystectomy care also remains in flux, as new pharmacologic agents that may potentiate earlier return of bowel function are studied. We review the current literature with regards to preoperative and postoperative cystectomy bowel management.
Review of CERN Data Centre Infrastructure
NASA Astrophysics Data System (ADS)
Andrade, P.; Bell, T.; van Eldik, J.; McCance, G.; Panzer-Steindel, B.; Coelho dos Santos, M.; Traylen and, S.; Schwickerath, U.
2012-12-01
The CERN Data Centre is reviewing strategies for optimizing the use of the existing infrastructure and expanding to a new data centre by studying how other large sites are being operated. Over the past six months, CERN has been investigating modern and widely-used tools and procedures used for virtualisation, clouds and fabric management in order to reduce operational effort, increase agility and support unattended remote data centres. This paper gives the details on the project's motivations, current status and areas for future investigation.
Sandia SWiFT Wind Turbine Manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, Jonathan; LeBlanc, Bruce Philip; Berg, Jonathan Charles
The Scaled Wind Farm Technology (SWiFT) facility, operated by Sandia National Laboratories for the U.S. Department of Energy's Wind and Water Power Program, is a wind energy research site with multiple wind turbines scaled for the experimental study of wake dynamics, advanced rotor development, turbine control, and advanced sensing for production-scale wind farms. The SWiFT site currently includes three variable-speed, pitch-regulated, three-bladed wind turbines. The six volumes of this manual provide a detailed description of the SWiFT wind turbines, including their operation and user interfaces, electrical and mechanical systems, assembly and commissioning procedures, and safety systems. Further dissemination only asmore » authorized to U.S. Government agencies and their contractors; other requests shall be approved by the originating facility or higher DOE programmatic authority. 111 UNCLASSIFIED UNLIMITED RELEASE Sandia SWiFT Wind Turbine Manual (SAND2016-0746 ) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Site Supervisor Dave Mitchell (6121) Date Note: Document revision logs are found after the title page of each volume of this manual. iv« less
Compost: Brown gold or toxic trouble?
Kovacic, D.A.; Cahill, R.A.; Bicki, T.J.
1992-01-01
Limited data are available regarding the occurrence of potentially hazardous constituents in raw, uncomposted yard wastes, partially composted yard wastes, and finished compost (15, 16). Environmental monitoring at composting operations or facilities is lacking, and currently published research on the environmental fate of composted yard waste constituents is extremely limited. The cost of thoroughly investigating the fate of toxicants in yard waste may seem needlessly expensive, but it is much less than the cost of cleaning up contaminated sites and groundwater. Could yard waste compost sites become Superfund sites? The cost of a thorough testing program throughout the United States may be several million dollars, but that is only a fraction of the funds spent initiating and developing yard waste composting facilities, let alone the potentially much greater cost of environmental remediation. There is still time to address these problems and to develop sound state and federal guidelines for siting and operating yard waste compost facilities. The rush to implement landfill alternatives such as composting should not be the major driving force in determining legislation governing solid waste management. ?? 1991 American Chemical Society.
NASA Astrophysics Data System (ADS)
Thomas, V. I.; Yu, E.; Acharya, P.; Jaramillo, J.; Chowdhury, F.
2015-12-01
Maintaining and archiving accurate site metadata is critical for seismic network operations. The Advanced National Seismic System (ANSS) Station Information System (SIS) is a repository of seismic network field equipment, equipment response, and other site information. Currently, there are 187 different sensor models and 114 data-logger models in SIS. SIS has a web-based user interface that allows network operators to enter information about seismic equipment and assign response parameters to it. It allows users to log entries for sites, equipment, and data streams. Users can also track when equipment is installed, updated, and/or removed from sites. When seismic equipment configurations change for a site, SIS computes the overall gain of a data channel by combining the response parameters of the underlying hardware components. Users can then distribute this metadata in standardized formats such as FDSN StationXML or dataless SEED. One powerful advantage of SIS is that existing data in the repository can be leveraged: e.g., new instruments can be assigned response parameters from the Incorporated Research Institutions for Seismology (IRIS) Nominal Response Library (NRL), or from a similar instrument already in the inventory, thereby reducing the amount of time needed to determine parameters when new equipment (or models) are introduced into a network. SIS is also useful for managing field equipment that does not produce seismic data (eg power systems, telemetry devices or GPS receivers) and gives the network operator a comprehensive view of site field work. SIS allows users to generate field logs to document activities and inventory at sites. Thus, operators can also use SIS reporting capabilities to improve planning and maintenance of the network. Queries such as how many sensors of a certain model are installed or what pieces of equipment have active problem reports are just a few examples of the type of information that is available to SIS users.
Site environmental report for Calendar Year 1994 on radiological and nonradiological parameters
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-06-30
Battelle Memorial Institute`s nuclear research facilities are currently being maintained in a surveillance and maintenance (S&M) mode with continual decontamination and decommissioning (D&D) activities being conducted under Department of Energy (DOE) Contract W-7405-ENG-92. These activities are referred to under the Contract as the Battelle Columbus Laboratories Decommissioning Project (BCLDP). Operations referenced in this report are performed in support of S&M and D&D activities. Battelle`s King Avenue facility is not considered in this report to the extent that the West Jefferson facility is. The source term at the King Avenue site is a small fraction of the source term at themore » West Jefferson site. Off site levels of radionuclides that could be attributed to the west Jefferson and King Avenue nuclear operations wereindistinguishable from background levels at specific locations where air, water, and direct radiation measurements were performed. Environmental monitoring continued to demonstrate compliance by Battelle with federal, state and local regulations. Routine, nonradiological activities performed include monitoring liquid effluents and monitoring the ground water system for the West Jefferson North site. Samples of various environmental media including air, water, grass, fish, field and garden crops, sediment and soil were collected from the region surrounding the two sites and analyzed.« less
Vocational Options for Deaf-Blind Youth Through Community-Based Training. Project ADVANCE.
ERIC Educational Resources Information Center
McGinnity, Betsy L.
Project ADVANCE currently provides vocational training to 26 deaf-blind adolescents and young adults attending Perkins School for the Blind in Watertown, Massachusetts. The project has developed community work sites in four different vocational options: (1) competitive employment, (2) a student operated small business, (3) sheltered enclave within…
Logging utilization in Oregon and Washington, 2011–2015
Eric A. Simmons; Todd A. Morgan; Erik C. Berg; Steven W. Hayes; Glenn A. Christensen
2016-01-01
A study of commercial timber harvesting activities in Oregon and Washington was conducted from 2011 through 2015 to characterize current tree utilization, logging operations, and assist with estimating the amount of woody biomass left onsite after harvesting. Sample logging sites were selected within major geographic regions proportional to regional 5-year timber...
An On-Line Program for Intermediate Level Latin Readings.
ERIC Educational Resources Information Center
Raia, Ann
2001-01-01
Introduces an on-line intermediate Latin program to potential users by describing the goals and elements of the site (www.iona.edu/latin). Operation of the program is described, as well as the benefits for language education, its current uses, and suggestions for more creative uses in the classroom. (Author/VWL)
Code of Federal Regulations, 2010 CFR
2010-07-01
... currently available (BPT). (a) The operator must submit a site-specific Pollution Abatement Plan to the permitting authority for the pollution abatement area. The plan must be approved by the permitting authority and incorporated into the permit as an effluent limitation. The Pollution Abatement Plan must identify...
Methods and strategies for future reactor safety goals
NASA Astrophysics Data System (ADS)
Arndt, Steven Andrew
There have been significant discussions over the past few years by the United States Nuclear Regulatory Commission (NRC), the Advisory Committee on Reactor Safeguards (ACRS), and others as to the adequacy of the NRC safety goals for use with the next generation of nuclear power reactors to be built in the United States. The NRC, in its safety goals policy statement, has provided general qualitative safety goals and basic quantitative health objectives (QHOs) for nuclear reactors in the United States. Risk metrics such as core damage frequency (CDF) and large early release frequency (LERF) have been used as surrogates for the QHOs. In its review of the new plant licensing policy the ACRS has looked at the safety goals, as has the NRC. A number of issues have been raised including what the Commission had in mind when it drafted the safety goals and QHOs, how risk from multiple reactors at a site should be combined for evaluation, how the combination of a new and old reactor at the same site should be evaluated, what the criteria for evaluating new reactors should be, and whether new reactors should be required to be safer than current generation reactors. As part of the development and application of the NRC safety goal policy statement the Commissioners laid out the expectations for the safety of a nuclear power plant but did not address the risk associated with current multi-unit sites, potential modular reactor sites, and hybrid sites that could contain current generation reactors, new passive reactors, and/or modular reactors. The NRC safety goals and the QHOs refer to a "nuclear power plant," but do not discuss whether a "plant" refers to only a single unit or all of the units on a site. There has been much discussion on this issue recently due to the development of modular reactors. Additionally, the risk of multiple reactor accidents on the same site has been largely ignored in the probabilistic risk assessments (PRAs) done to date, and in most risk-informed analyses and discussions. This dissertation examines potential approaches to updating the safety goals that include the establishment of new quantitative safety goal associated with the comparative risk of generating electricity by viable competing technologies and modifications of the goals to account for multi-plant reactor sites, and issues associated with the use of safety goals in both initial licensing and operational decision making. This research develops a new quantitative health objective that uses a comparable benefit risk metric based on the life-cycle risk of the construction, operation and decommissioning of a comparable non-nuclear electric generation facility, as well as the risks associated with mining and transportation. This dissertation also evaluates the effects of using various methods for aggregating site risk as a safety metric, as opposed to using single plant safety goals. Additionally, a number of important assumptions inherent in the current safety goals, including the effect of other potential negative societal effects such as the generation of greenhouse gases (e.g., carbon dioxide) have on the risk of electric power production and their effects on the setting of safety goals, is explored. Finally, the role risk perception should play in establishing safety goals has been explored. To complete this evaluation, a new method to analytically compare alternative technologies of generating electricity was developed, including development of a new way to evaluate risk perception, and a new method was developed for evaluating the risk at multiple units on a single site. To test these modifications to the safety goals a number of possible reactor designs and configurations were evaluated using these new proposed safety goals to determine the goals' usefulness and utility. The results of the analysis showed that the modifications provide measures that more closely evaluate the potential risk to the public from the operation of nuclear power plants than the current safety goals, while still providing a straight-forward process for assessment of reactor design and operation.
Measurement of the Vertical Distribution of Aerosol by Globally Distributed MP Lidar Network Sites
NASA Technical Reports Server (NTRS)
Spinhirne, James; Welton, Judd; Campbell, James; Starr, David OC. (Technical Monitor)
2001-01-01
The global distribution of aerosol has an important influence on climate through the scattering and absorption of shortwave radiation and through modification of cloud optical properties. Current satellite and other data already provide a great amount of information on aerosol distribution. However there are critical parameters that can only be obtained by active optical profiling. For aerosol, no passive technique can adequately resolve the height profile of aerosol. The aerosol height distribution is required for any model for aerosol transport and the height resolved radiative heating/cooling effect of aerosol. The Geoscience Laser Altimeter System (GLAS) is an orbital lidar to be launched by 2002. GLAS will provide global measurements of the height distribution of aerosol. The sampling will be limited by nadir only coverage. There is a need for local sites to address sampling, and accuracy factors. Full time measurements of the vertical distribution of aerosol are now being acquired at a number of globally distributed MP (micro pulse) lidar sites. The MP lidar systems provide profiling of all significant cloud and aerosol to the limit of signal attenuation from compact, eye safe instruments. There are currently six sites in operation and over a dozen planned. At all sites there are a complement of passive aerosol and radiation measurements supporting the lidar data. Four of the installations are at Atmospheric Radiation Measurement program sites. The aerosol measurements, retrievals and data products from the network sites will be discussed. The current and planned application of data to supplement satellite aerosol measurements is covered.
NASA Astrophysics Data System (ADS)
Prucha, R. H.; Dayton, C. S.; Hawley, C. M.
2002-12-01
The Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado, a former Department of Energy nuclear weapons manufacturing facility, is currently undergoing closure. The natural semi-arid interaction between surface and subsurface flow at RFETS is complex and complicated by the industrial modifications to the flow system. Using a substantial site data set, a distributed parameter, fully-integrated hydrologic model was developed to assess the hydrologic impact of different hypothetical site closure configurations on the current flow system and to better understand the integrated hydrologic behavior of the system. An integrated model with this level of detail has not been previously developed in a semi-arid area, and a unique, but comprehensive, approach was required to calibrate and validate the model. Several hypothetical scenarios were developed to simulate hydrologic effects of modifying different aspects of the site. For example, some of the simulated modifications included regrading the current land surface, changing the existing surface channel network, removing subsurface trenches and gravity drain flow systems, installing a slurry wall and geotechnical cover, changing the current vegetative cover, and converting existing buildings and pavement to permeable soil areas. The integrated flow model was developed using a rigorous physically-based code so that realistic design parameters can simulate these changes. This code also permitted evaluation of changes to complex integrated hydrologic system responses that included channelized and overland flow, pond levels, unsaturated zone storage, groundwater heads and flow directions, and integrated water balances for key areas. Results generally show that channel flow offsite decreases substantially for different scenarios, while groundwater heads generally increase within the reconfigured industrial area most of which is then discharged as evapotranspiration. These changes have significant implications to site closure and operation.
NASA Astrophysics Data System (ADS)
Semerjyan, Vardan; Yuan, Tao
2011-04-01
Sodium (Na) Faraday filters based spectrometer is a relatively new instrument to study sodium nightglow as well as sodium and oxygen chemistry in the mesopause region. Successful spectrometer measurement demands highly accurate control of filter temperature. The ideal, long-term operation site for the Na spectrometer is an isolated location with minimum nocturnal sky background. Thus, the remote control of the filter temperature is a requirement for such operation, whereas current temperature controllers can only be operated manually. The proposed approach is aimed to not only enhance the temperature control, but also achieve spectrometer's remote and autonomous operation. In the meantime, the redesign should relief the burden of the cost for multi temperature controllers. The program will give to the operator flexibility in setting the operation temperatures of the Faraday filters, monitoring the temperature variations, and logging the data during the operation. Research will make diligent efforts to attach preliminary data analysis subroutine to the main control program. The real-time observation results will be posted online after the observation is completed. This approach also can be a good substitute for the temperature control system currently used to run the Lidar system at Utah State University (USU).
NASA Astrophysics Data System (ADS)
Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.
2017-12-01
This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. M. Capron
2008-04-17
The 100-F-54 waste site, part of the 100-FR-2 Operable Unit, is the soil associated with the former pastures for holding domestic farm animals used in experimental toxicology studies. Evaluation of historical information resulted in identification of the experimental animal farm pastures as having potential residual soil contamination due to excrement from experimental animals. The 100-F-54 animal farm pastures confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminantmore » concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ann R. Dallman; Neary, Vincent S.
This report presents met-ocean data and wave energy characteristics at eight U.S. wave energy converter (WEC) test and potential deployment sites. Its purpose is to enable the comparison of wave resource characteristics among sites as well as the selection of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives. It also provides essential inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment, and operations and maintenance. For each site, this report catalogues wave statistics recommended in the International Electrotechnical Commission Technical Specimore » cation (IEC 62600-101 TS) on Wave Energy Characterization, as well as the frequency of occurrence of weather windows and extreme sea states, and statistics on wind and ocean currents. It also provides useful information on test site infrastructure and services.« less
Sondossi, Hoda A.; Fairley, Helen C.
2014-01-01
The development of a one-dimensional flow-routing model for the Colorado River between Lees Ferry and Diamond Creek, Arizona in 2008 provided a potentially useful tool for assessing the degree to which varying discharges from Glen Canyon Dam may inundate terrestrial environments and potentially affect resources located within the zone of inundation. Using outputs from the model, a geographic information system analysis was completed to evaluate the degree to which flows from Glen Canyon Dam might inundate archaeological sites located along the Colorado River in the Grand Canyon. The analysis indicates that between 4 and 19 sites could be partially inundated by flows released from Glen Canyon Dam under current (2014) operating guidelines, and as many as 82 archaeological sites may have been inundated to varying degrees by uncontrolled high flows released in June 1983. Additionally, the analysis indicates that more of the sites currently (2014) proposed for active management by the National Park Service are located at low elevations and, therefore, tend to be more susceptible to potential inundation effects than sites not currently (2014) targeted for management actions, although the potential for inundation occurs in both groups of sites. Because of several potential sources of error and uncertainty associated with the model and with limitations of the archaeological data used in this analysis, the results are not unequivocal. These caveats, along with the fact that dam-related impacts can involve more than surface-inundation effects, suggest that the results of this analysis should be used with caution to infer potential effects of Glen Canyon Dam on archaeological sites in the Grand Canyon.
Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS
NASA Technical Reports Server (NTRS)
Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.
2009-01-01
Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 2-acre Better Brite Plating Chrome and Zinc site is composed of two plating facilities in De Pere, Brown County, Wisconsin. The site includes the 1.5-acre Chrome Shop and the 0.5-acre Zinc Shop. Land use in the area is predominantly residential and commercial, with a wetlands located approximately one-quarter mile from the site. The estimated 15,000 area residents use the municipal wells drawing from the deep aquifer as a drinking water supply. The Zinc Shop has a long history of improper operational procedures and spills into the surrounding soil. The selected remedial action for this interim remedy includes continuing andmore » expanding the current operation of the ground water extraction system and pretreatment facility, which will include pretreatment of the additional water collected by the surface water and ground water collection systems, and the Chrome and Zinc shops, with discharge to the De Pere wastewater system.« less
Development and demonstration of a telerobotic excavation system
NASA Technical Reports Server (NTRS)
Burks, Barry L.; Thompson, David H.; Killough, Stephen M.; Dinkins, Marion A.
1994-01-01
Oak Ridge National Laboratory is developing remote excavation technologies for the Department of Energy's Office (DOE) of Technology Development, Robotics Technology Development Program, and also for the Department of Defense (DOD) Project Manager for Ammunition Logistics. This work is being done to meet the need for remote excavation and removal of radioactive and contaminated buried waste at several DOE sites and unexploded ordnance at DOD sites. System requirements are based on the need to uncover and remove waste from burial sites in a way that does not cause unnecessary personnel exposure or additional environmental contamination. Goals for the current project are to demonstrate dexterous control of a backhoe with force feedback and to implement robotic operations that will improve productivity. The Telerobotic Small Emplacement Excavator is a prototype system that incorporates the needed robotic and telerobotic capabilities on a commercially available platform. The ability to add remote dexterous teleoperation and robotic operating modes is intended to be adaptable to other commercially available excavator systems.
The Cherenkov Telescope Array: Exploring the Very-high-energy Sky from ESO's Paranal Site
NASA Astrophysics Data System (ADS)
Hofmann, W.
2017-06-01
The Cherenkov Telescope Array (CTA) is a next-generation observatory for ground-based very-high-energy gamma-ray astronomy, using the imaging atmospheric Cherenkov technique to detect and reconstruct gamma-ray induced air showers. The CTA project is planning to deploy 19 telescopes on its northern La Palma site, and 99 telescopes on its southern site at Paranal, covering the 20 GeV to 300 TeV energy domain and offering vastly improved performance compared to currently operating Cherenkov telescopes. The combination of three different telescope sizes (23-, 12- and 4-metre) allows cost-effective coverage of the wide energy range. CTA will be operated as a user facility, dividing observation time between a guest observer programme and large Key Science Projects (KSPs), and the data will be made public after a one-year proprietary period. The history of the project, the implementation of the arrays, and some of the major science goals and KSPs, are briefly summarised.
Overview of environmental and hydrogeologic conditions at Moses Point, Alaska
Dorava, J.M.; Ayres, R.P.; Sisco, W.C.
1994-01-01
The Federal Aviation Administration facility at Moses Point is located at the mouth of the Kwiniuk River on the Seward Peninsula in northwestern Alaska. This area has long cold winters and short summers which affect the hydrology of the area. The Federal Aviation Administration owns or operates airport support facilities at the Moses Point site and wishes to consider the subsistence lifestyles of area residents and the quality of the current environment when evaluating options for remediation of environmental contamination at their facilities. Currently no operating wells are in the area, but the vulnerability of the aquifer and other alternative water supplies are being evaluated because the Federal Aviation Administration has a potential liability for the storage and use of hazardous materials in the area.
AmeriFlux US-SO4 Sky Oaks- New Stand
Oechel, Walt [San Diego State University
2016-01-01
This is the AmeriFlux version of the carbon flux data for the site US-SO4 Sky Oaks- New Stand. Site Description - The Sky Oaks New site is located near the Sky Oaks Field station, owned and operated by San Diego State University. Chaparral vegetation, associated with a Mediterranean climate, covers nearly half of the rough and rocky terrain. Precipitation is almost exclusively confined to the winter months. During the summer and early fall, hot and dry Santa Ana winds from the northeast bring desert heat to the site. A high intensity natural wildfire occurred in approximately 1905. Physical characteristics prior to the 1905 burn are unknown, including stand age and canopy height. Currently, the Sky Oaks New site is an excellent representation of an old-growth chaparral ecosystem, with a canopy height of 2.3 m and chamise-dominated overstory.
Remediation strategies for historical mining and smelting sites.
Dybowska, Agnieszka; Farago, Margaret; Valsami-Jones, Eugenia; Thornton, Iain
2006-01-01
The environmental, social and economic problems associated with abandoned mine sites are serious and global. Environmental damage arising from polluted waters and dispersal of contaminated waste is a feature characteristic of many old mines in North America, Australia, Europe and elsewhere. Today, because of the efficiency of mining operations and legal requirements in many countries for prevention of environmental damage from mining operations, the release of metals to the environment from modern mining is low. However, many mineralized areas that were extensively worked in the 18th and 19th centuries and left abandoned after mining had ceased, have left a legacy of metal contaminated land. Unlike organic chemicals and plastics, metals cannot be degraded chemically or biologically into non-toxic and environmentally neutral constituents. Thus sites contaminated with toxic metals present a particular challenge for remediation. Soil remediation has been the subject of a significant amount of research work in the past decade; this has resulted in a number of remediation options currently available or being developed. Remediation strategies for metal/metalloid contaminated historical mining sites are reviewed and summarized in this article. It focuses on the current applications of in situ remediation with the use of soil amendments (adsorption and precipitation based methods are discussed) and phytoremediation (in situ plant based technology for environmental clean up and restoration). These are promising alternative technologies to traditional options of excavation and ex situ treatment, offering an advantage of being non-invasive and low cost. In particular, they have been shown to be effective in remediation of mining and smelting contaminated sites, although the long-term durability of these treatments cannot be predicted.
Operational Space Weather Needs - Perspectives from SEASONS 2014
NASA Astrophysics Data System (ADS)
Comberiate, J.; Kelly, M. A.; Paxton, L. J.; Schaefer, R. K.; Bust, G. S.; Sotirelis, T.; Fox, N. J.
2014-12-01
A key challenge for the operational space weather community is the gap between the latest scientific data, models, methods, and indices and those that are currently used in operational systems. The November 2014 SEASONS (Space Environment Applications, Systems, and Operations for National Security) Workshop at JHU/APL in Laurel, Maryland, brings together representatives from the operational and scientific communities. The theme of SEASONS 2014 is "Beyond Climatology," with a focus on how space weather events threaten operational assets and disrupt missions. Here we present perspectives from SEASONS 2014 on new observations, models in development, and forecasting methods that are of interest to the operational space weather community. Highlighted topics include ionospheric data assimilation and forecasting models, HF propagation models, radiation belt observations, and energetic particle modeling. The SEASONS 2014 web site can be found at https://secwww.jhuapl.edu/SEASONS/
EarthScope's Transportable Array: Advancing Eastward
NASA Astrophysics Data System (ADS)
Busby, R. W.; Vernon, F.; Newman, R. L.; Astiz, L.
2006-12-01
EarthScope's Transportable Array has installed more than 200 high-quality broadband seismic stations over the last 3 years in the western US. These stations have a nominal spacing of 70 km and are part of an eventual 400 station array that migrates from west to east at a rate of 18 stations per month. The full 400 stations will be operating by September 2007. Stations have a residence time of about 2 years before being relocated to the next site. Throughout the continental US, 1623 sites are expected to be occupied. Standardized procedures and protocols have been developed to streamline all aspects of Transportable Array operations, from siting to site construction and installation to equipment purchasing and data archiving. Earned Value Management tools keep facility installation and operation on budget and schedule. A diverse, yet efficient, infrastructure installs and maintains the Transportable Array. Sensors, dataloggers, and other equipment are received and tested by the IRIS PASSCAL Instrument Center and shipped to regional storage facilities. To engage future geoscientists in the project, students are trained to conduct field and analytical reconnaissance to identify suitable seismic station sites. Contract personnel are used for site verification; vault construction; and installation of sensors, power, and communications systems. IRIS staff manages permitting, landowner communications, and station operations and maintenance. Seismic signal quality and metadata are quality-checked at the Array Network Facility at the University of California-San Diego and simultaneously archived at the IRIS Data Management Center in Seattle. Station equipment has been specifically designed for low power, remote, unattended operation and uses diverse two-way IP communications for real-time transmission. Digital cellular services, VSAT satellite, and commercial DSL, cable or wireless transport services are employed. Automatic monitoring of status, signal quality and earthquake event detection as well as operational alarms for low voltage and water intrusion are performed by a robust data acquisition package. This software is coupled with a host of network management tools and display managers operated by the Array Network Facility to allow managers, field personnel, and network operations staff to visualize array performance in real-time and to access historical information for diagnostics. Current data recording proficiency is 99.1%, with real-time telemetry averaging about 91%. EarthScope, IRIS and the USGS are working with regional seismic network operators, both existing and newly formed, to transition some of the Transportable Array stations into regional network assets. Each region has unique circumstances and interested parties are invited to exchange ideas on how this might be accomplished in their area. Contact busby@iris.edu for more information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Byerly, D.W.
1976-06-01
The following is a report of investigation on the geologic setting of several underground limestone mines in Ohio other than the PPG mine at Barberton, Ohio. Due to the element of available time, the writer is only able to deliver a brief synopsis of the geology of three sites visited. These three sites and the Barberton, Ohio site are the only underground limestone mines in Ohio to the best of the writer's knowledge. The sites visited include: (1) the Jonathan Mine located near Zanesville, Ohio, and currently operated by the Columbia Cement Corporation; (2) the abandoned Alpha Portland Cement Minemore » located near Ironton, Ohio; and (3) the Lewisburg Mine located at Lewisburg, Ohio, and currently being utilized as an underground storage facility. Other remaining possibilities where limestone is being mined underground are located in middle Ordovician strata near Carntown and Maysville, Kentucky. These are drift mines into a thick sequence of carbonates. The writer predicts, however, that these mines would have some problems with water due to the preponderance of carbonate rocks and the proximity of the mines to the Ohio River. None of the sites visited nor the sites in Kentucky have conditions comparable to the deep mine at Barberton, Ohio.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan R. Dutton; H. Seay Nance
2003-06-01
Commercial and centralized drilling-fluid disposal (CCDD) sites receive a portion of spent drilling fluids for disposal from oil and gas exploration and production (E&P) operations. Many older and some abandoned sites may have operated under less stringent regulations than are currently enforced. This study provides a census, compilation, and summary of information on active, inactive, and abandoned CCDD sites in Louisiana, New Mexico, Oklahoma, and Texas, intended as a basis for supporting State-funded assessment and remediation of abandoned sites. Closure of abandoned CCDD sites is within the jurisdiction of State regulatory agencies. Sources of data used in this study onmore » abandoned CCDD sites mainly are permit files at State regulatory agencies. Active and inactive sites were included because data on abandoned sites are sparse. Onsite reserve pits at individual wells for disposal of spent drilling fluid are not part of this study. Of 287 CCDD sites in the four States for which we compiled data, 34 had been abandoned whereas 54 were active and 199 were inactive as of January 2002. Most were disposal-pit facilities; five percent were land treatment facilities. A typical disposal-pit facility has fewer than 3 disposal pits or cells, which have a median size of approximately 2 acres each. Data from well-documented sites may be used to predict some conditions at abandoned sites; older abandoned sites might have outlier concentrations for some metal and organic constituents. Groundwater at a significant number of sites had an average chloride concentration that exceeded nonactionable secondary drinking water standard of 250 mg/L, or a total dissolved solids content of >10,000 mg/L, the limiting definition for underground sources of drinking water source, or both. Background data were lacking, however, so we did not determine whether these concentrations in groundwater reflected site operations. Site remediation has not been found necessary to date for most abandoned CCDD sites; site assessments and remedial feasibility studies are ongoing in each State. Remediation alternatives addressed physical hazards and potential for groundwater transport of dissolved salt and petroleum hydrocarbons that might be leached from wastes. Remediation options included excavation of wastes and contaminated adjacent soils followed by removal to permitted disposal facilities or land farming if sufficient on-site area were available.« less
Clinical operations generation next… The age of technology and outsourcing
Temkar, Priya
2015-01-01
Huge cost pressures and the need to drive faster approvals has driven a technology transformation in the clinical trial (CT) industry. The CT industry is thus leveraging mobile data, cloud computing, social media, robotic automation, and electronic source to drive efficiencies in a big way. Outsourcing of clinical operations support services to technology companies with a clinical edge is gaining tremendous importance. This paper provides an overview of current technology trends, applicable Food and Drug Administration (FDA) guidelines, basic challenges that the pharma industry is facing in trying to implement such changes and its shift towards outsourcing these services to enable it to focus on site operations. PMID:26623386
Clinical operations generation next… The age of technology and outsourcing.
Temkar, Priya
2015-01-01
Huge cost pressures and the need to drive faster approvals has driven a technology transformation in the clinical trial (CT) industry. The CT industry is thus leveraging mobile data, cloud computing, social media, robotic automation, and electronic source to drive efficiencies in a big way. Outsourcing of clinical operations support services to technology companies with a clinical edge is gaining tremendous importance. This paper provides an overview of current technology trends, applicable Food and Drug Administration (FDA) guidelines, basic challenges that the pharma industry is facing in trying to implement such changes and its shift towards outsourcing these services to enable it to focus on site operations.
The ATLAS PanDA Pilot in Operation
NASA Astrophysics Data System (ADS)
Nilsson, P.; Caballero, J.; De, K.; Maeno, T.; Stradling, A.; Wenaus, T.; ATLAS Collaboration
2011-12-01
The Production and Distributed Analysis system (PanDA) [1-2] was designed to meet ATLAS [3] requirements for a data-driven workload management system capable of operating at LHC data processing scale. Submitted jobs are executed on worker nodes by pilot jobs sent to the grid sites by pilot factories. This paper provides an overview of the PanDA pilot [4] system and presents major features added in light of recent operational experience, including multi-job processing, advanced job recovery for jobs with output storage failures, gLExec [5-6] based identity switching from the generic pilot to the actual user, and other security measures. The PanDA system serves all ATLAS distributed processing and is the primary system for distributed analysis; it is currently used at over 100 sites worldwide. We analyze the performance of the pilot system in processing real LHC data on the OSG [7], EGI [8] and Nordugrid [9-10] infrastructures used by ATLAS, and describe plans for its evolution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatheway, A.W.; Anderson, D.R.
Missouri's first gas works began operation in 1845 (St. Louis). By 1900, gas works operated in many northern-Missouri coal belt towns, major cities, and Hannibal and Cape Girardeau (Mississippi River supply). Today's 40-odd former manufactured gas plant (FMPGs) sites are fiscal nightmares for parent utility companies; all hazardous waste groups are prevalent to the plants. Tar residuals may migrate along/through geologic anomalies. Tar-water emulsions typically were disposed in tar wells or nearby drainages or many times plumbed directly into sewers, which typically leaked into the environment at unpredictable down gradient locations. Just as well site geologic characteristics and current groundwatermore » usage may render FMPGs relatively harmless from the human exposure standpoint. Geologic deduction, photo interpretation, careful subsurface exploration and engineering geophysics can locate hot spots and delimit contaminant migration. Many types of historic documents chronicle changes in plant character and equipment, as well as mode of operation. Without such details, mistakes in characterization are likely and errors in risk assessment and selection of remedial technologies are possible.« less
Space weather activities in Australia
NASA Astrophysics Data System (ADS)
Cole, D.
Space Weather Plan Australia has a draft space weather plan to drive and focus appropriate research into services that meet future industry and social needs. The Plan has three main platforms, space weather monitoring and service delivery, support for priority research, and outreach to the community. The details of monitoring, service, research and outreach activities are summarised. A ground-based network of 14 monitoring stations from Antarctica to Papua New Guinea is operated by IPS, a government agency. These sites monitor ionospheric and geomagnetic characteristics, while two of them also monitor the sun at radio and optical wavelengths. Services provided through the Australian Space Forecast Centre (ASFC) include real-time information on the solar, space, ionospheric and geomagnetic environments. Data are gathered automatically from monitoring sites and integrated with data exchanged internationally to create snapshots of current space weather conditions and forecasts of conditions up to several days ahead. IPS also hosts the WDC for Solar-Terrestrial Science and specialises in ground-based solar, ionospheric, and geomagnetic data sets, although recent in-situ magnetospheric measurements are also included. Space weather activities A research consortium operates the Tasman International Geospace Environment Radar (TIGER), an HF southward pointing auroral radar operating from Hobart (Tasmania). A second cooperative radar (Unwin radar) is being constructed in the South Island of New Zealand. This will intersect with TIGER over the auroral zone and enhance the ability of the radar to image the surge of currents that herald space environment changes entering the Polar Regions. Launched in November 2002, the micro satellite FEDSAT, operated by the Cooperative Research Centre for Satellite Systems, has led to successful space science programs and data streams. FEDSAT is making measurements of the magnetic field over Australia and higher latitudes. It also carries a GPS receiver measuring total electron content data for magnetospheric and ionospheric studies. Understanding cosmic ray phenomena requires observations from a range of locations. The Mawson observatory, comprising low and high energy surface and high energy underground instruments, is the largest and most sophisticated observatory of its type in the Southern Hemisphere, and the only one at polar latitudes. The Australian Antarctic Division operates similar detectors at other sites. Australia has proved to be a successful site for ground-based studies and satellite downlink facilities for international collaborative projects, such as ILWS, which are monitoring Sun-Earth activity and exploring techniques for space weather forecasting.
NASA Astrophysics Data System (ADS)
Morley, M. G.; Mihaly, S. F.; Dewey, R. K.; Jeffries, M. A.
2015-12-01
Ocean Networks Canada (ONC) operates the NEPTUNE and VENUS cabled ocean observatories to collect data on physical, chemical, biological, and geological ocean conditions over multi-year time periods. Researchers can download real-time and historical data from a large variety of instruments to study complex earth and ocean processes from their home laboratories. Ensuring that the users are receiving the most accurate data is a high priority at ONC, requiring quality assurance and quality control (QAQC) procedures to be developed for all data types. While some data types have relatively straightforward QAQC tests, such as scalar data range limits that are based on expected observed values or measurement limits of the instrument, for other data types the QAQC tests are more comprehensive. Long time series of ocean currents from Acoustic Doppler Current Profilers (ADCP), stitched together from multiple deployments over many years is one such data type where systematic data biases are more difficult to identify and correct. Data specialists at ONC are working to quantify systematic compass heading uncertainty in long-term ADCP records at each of the major study sites using the internal compass, remotely operated vehicle bearings, and more analytical tools such as principal component analysis (PCA) to estimate the optimal instrument alignments. In addition to using PCA, some work has been done to estimate the main components of the current at each site using tidal harmonic analysis. This paper describes the key challenges and presents preliminary PCA and tidal analysis approaches used by ONC to improve long-term observatory current measurements.
77 FR 5201 - Drawbridge Operation Regulation; Bear Creek, Dundalk, MD
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... bridge opening to a 48-hour advance notice requirement for a bridge opening. Due to the lack of openings... this bridge has had fewer than 12 openings every year since 2008. The majority of these openings have... it difficult, logistically, to arrive at the bridge site for an opening within the current four hour...
DWPF Safely Dispositioning Liquid Waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-01-05
The only operating radioactive waste glassification plant in the nation, the Defense Waste Processing Facility (DWPF) converts the liquid radioactive waste currently stored at the Savannah River Site (SRS) into a solid glass form suitable for long-term storage and disposal. Scientists have long considered this glassification process, called “vitrification,” as the preferred option for treating liquid radioactive waste.
The Clean Air Status and Trends Network (CASTNET) is a long-term environmental monitoring program that measures trends in ambient air quality and atmospheric dry pollutant deposition across the United States. CASTNET has been operating since 1987 and currently consists of 89 moni...
EPA currently requires that application of Concentrated Animal Feeding Operation (CAFO) wastes to agricultural fields follows a Comprehensive Nutrient Management Plan (CNMP). The tacit assumption is that a well designed and executed CNMP ensures that all lagoon water contaminants...
Alabama, 2012 - forest inventory and analysis factsheet
Andrew J. Hartsell
2013-01-01
These early surveys were not concerned with the forests, species, and tree sizes that were not considered commercially viable. Early surveys reported only on growing-stock trees on timberlands, i.e. commercially important tree species and tree sizes on forests that could sustain harvest operations. Currently, FIA reports on all of the forest lands regardless of site...
Maintaining site productivity during biofuel harvest operations
Deborah Page-Dumoese; Mark Kimsey
2012-01-01
Demand for forest biomass for bioenergy production and other uses is expected to increase to four times the current level in the next one to five years. The search for alternative energy sources, including forest bioenergy, increases pressure on the productive capacity of our western forestlands. The questions are: Can forest soils in the western U.S. support more...
CBRNE Detection: Technology is not a Strategy
2008-05-25
boundaries to the US national laboratories for definitive identification. Currently in Iraq, chemists are performing forensic analysis of explosive...force health protection, forensics and WMD elimination with one theater asset, especially where instrumentation and scientific disciplines converge...substances in the area of operations; supporting forensic requirements during sensitive site exploitation; and issues relating to the impact of
Military Hazardous Wastes: An Overview and Analysis.
1981-12-01
the soil as fertilizers or soil conditioners * Mining overburden returned to the mine site Utility wastes (fly ash, flue gas desulfurization sludge...19 3.3.2 What Is the Significance of Superfund to Military Wastes? ...... ............... 20 3.4 Toxic Substances Control Act...Hazardous Wastes From Current and Future Operations .... ......... 34 4.4 Organizational Responsibilities ... ............. .. 42 5. CONTROL TECHNOLOGY
Assessment of air pollutant emissions from the Akrotiri landfill site (Chania, Greece).
Chalvatzaki, E; Lazaridis, M
2010-09-01
Air pollutants emitted from landfills affect air quality, contribute to the greenhouse effect and may cause serious problems to human health under certain circumstances. The current study was focused on the determination of air emissions from the Akrotiri landfill site which is located in the Akrotiri area (Chania, Greece). The landfill consists of two phases, phase A (first phase) which is currently closed (operational between 2003 and 2007) and phase B (second phase, operation between 2007 and (foreseen) 2013). Three different emission models (the EPA LandGEM model, the triangular model and the stoichiometric model) were used for the quantification of emissions. The LandGEM 3.02 software was further adopted and used in conjunction with the long-term dispersion model ISC3-LT for the evaluation of the dispersion of gaseous chemical components from the landfill. The emission and meteorological conditions under which the models were applied were based on the worst-case emission scenario. Furthermore, the concentration of hydrogen sulfide, vinyl chloride and benzene were determined in and around the landfill site. The concentrations of hydrogen sulfide and benzene were calculated to be far below the limit value proposed by the World Health Organization (WHO) for human health safety. However, the vinyl chloride concentrations were above the WHO reference lifetime exposure health criteria for the phase B area.
3D simulation as a tool for improving the safety culture during remediation work at Andreeva Bay.
Chizhov, K; Sneve, M K; Szőke, I; Mazur, I; Mark, N K; Kudrin, I; Shandala, N; Simakov, A; Smith, G M; Krasnoschekov, A; Kosnikov, A; Kemsky, I; Kryuchkov, V
2014-12-01
Andreeva Bay in northwest Russia hosts one of the former coastal technical bases of the Northern Fleet. Currently, this base is designated as the Andreeva Bay branch of Northwest Center for Radioactive Waste Management (SevRAO) and is a site of temporary storage (STS) for spent nuclear fuel (SNF) and other radiological waste generated during the operation and decommissioning of nuclear submarines and ships. According to an integrated expert evaluation, this site is the most dangerous nuclear facility in northwest Russia. Environmental rehabilitation of the site is currently in progress and is supported by strong international collaboration. This paper describes how the optimization principle (ALARA) has been adopted during the planning of remediation work at the Andreeva Bay STS and how Russian-Norwegian collaboration greatly contributed to ensuring the development and maintenance of a high level safety culture during this process. More specifically, this paper describes how integration of a system, specifically designed for improving the radiological safety of workers during the remediation work at Andreeva Bay, was developed in Russia. It also outlines the 3D radiological simulation and virtual reality based systems developed in Norway that have greatly facilitated effective implementation of the ALARA principle, through supporting radiological characterisation, work planning and optimization, decision making, communication between teams and with the authorities and training of field operators.
Geoengineering properties of potential repository units at Yucca Mountain, southern Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tillerson, J.R.; Nimick, F.B.
1984-12-01
The Nevada Nuclear Waste Storage Investigations (NNWSI) Project is currently evaluating volcanic tuffs at the Yucca Mountain site, located on and adjacent to the Nevada Test Site, for possible use as a host rock for a radioactive waste repository. The behavior of tuff as an engineering material must be understood to design, license, construct, and operate a repository. Geoengineering evaluations and measurements are being made to develop confidence in both the analysis techniques for thermal, mechanical, and hydrothermal effects and the supporting data base of rock properties. The analysis techniques and the data base are currently used for repository design,more » waste package design, and performance assessment analyses. This report documents the data base of geoengineering properties used in the analyses that aided the selection of the waste emplacement horizon and in analyses synopsized in the Environmental Assessment Report prepared for the Yucca Mountain site. The strategy used for the development of the data base relies primarily on data obtained in laboratory tests that are then confirmed in field tests. Average thermal and mechanical properties (and their anticipated variations) are presented. Based upon these data, analyses completed to date, and previous excavation experience in tuff, it is anticipated that existing mining technology can be used to develop stable underground openings and that repository operations can be carried out safely.« less
Launching the Next Generation IODP Site Survey Data Bank
NASA Astrophysics Data System (ADS)
Miller, S. P.; Helly, J.; Clark, D.; Eakins, B.; Sutton, D.; Weatherford, J.; Thatch, G.; Miville, B.; Zelt, B.
2005-12-01
The next generation all-digital Site Survey Data Bank (SSDB) became operational on August 15, 2005 as an online resource for Integrated Ocean Drilling Program (IODP) proponents, reviewers, panels and operations, worldwide. There are currently 123 active proposals for drilling at sites distributed across the globe, involving nearly 1000 proponents from more than 40 countries. The goal is to provide an authoritative, persistent, secure, password-controlled and easily-used home for contributed data objects, as proposals evolve through their life cycle from preliminary phases to planned drilling expeditions. Proposal status can be monitored graphically by proposal number, data type or date. A Java SSDBviewer allows discovery of all proposal data objects, displayed over a basemap of global topography, crustal age or other custom maps. Data can be viewed or downloaded under password control. Webform interfaces assist with the uploading of data and metadata. Thirty four different standard data types are currently supported. The system was designed as a fully functioning digital library, not just a database or a web archive, drawing upon the resources of the SIOExplorer Digital Library project. Blocks of metadata are organized to support discovery and use, as appropriate for each data type. The SSDB has been developed by a UCSD team of researchers and computer scientists at the Scripps Institution of Oceanography and the San Diego Supercomputer Center, under contract with IODP Management International Inc., supported by NSF OCE 0432224.
Incorporation of operator knowledge for improved HMDS GPR classification
NASA Astrophysics Data System (ADS)
Kennedy, Levi; McClelland, Jessee R.; Walters, Joshua R.
2012-06-01
The Husky Mine Detection System (HMDS) detects and alerts operators to potential threats observed in groundpenetrating RADAR (GPR) data. In the current system architecture, the classifiers have been trained using available data from multiple training sites. Changes in target types, clutter types, and operational conditions may result in statistical differences between the training data and the testing data for the underlying features used by the classifier, potentially resulting in an increased false alarm rate or a lower probability of detection for the system. In the current mode of operation, the automated detection system alerts the human operator when a target-like object is detected. The operator then uses data visualization software, contextual information, and human intuition to decide whether the alarm presented is an actual target or a false alarm. When the statistics of the training data and the testing data are mismatched, the automated detection system can overwhelm the analyst with an excessive number of false alarms. This is evident in the performance of and the data collected from deployed systems. This work demonstrates that analyst feedback can be successfully used to re-train a classifier to account for variable testing data statistics not originally captured in the initial training data.
NASA Astrophysics Data System (ADS)
Omine, Yukio; Sakai, Masaki; Aoki, Yoshimitsu; Takagi, Mikio
2004-10-01
In recent years, crisis management in response to terrorist attacks and natural disasters, as well as accelerating rescue operations has become an important issue. Rescue operations greatly influence human lives, and require the ability to accurately and swiftly communicate information as well as assess the status of the site. Currently, considerable amount of research is being conducted for assisting rescue operations, with the application of various engineering techniques such as information technology and radar technology. In the present research, we believe that assessing the status of the site is most crucial in rescue and firefighting operations at a fire disaster site, and aim to visualize the space that is smothered with dense smoke. In a space filled with dense smoke, where visual or infrared sensing techniques are not feasible, three-dimensional measurements can be realized using a compact millimeter wave radar device combined with directional information from a gyro sensor. Using these techniques, we construct a system that can build and visualize a three-dimensional geometric model of the space. The final objective is to implement such a system on a wearable computer, which will improve the firefighters' spatial perception, assisting them in the baseline assessment and the decision-making process. In the present paper, we report the results of the basic experiments on three-dimensional measurement and visualization of a space that is smoke free, using a millimeter wave radar.
Telerobot local-remote control architecture for space flight program applications
NASA Technical Reports Server (NTRS)
Zimmerman, Wayne; Backes, Paul; Steele, Robert; Long, Mark; Bon, Bruce; Beahan, John
1993-01-01
The JPL Supervisory Telerobotics (STELER) Laboratory has developed and demonstrated a unique local-remote robot control architecture which enables management of intermittent communication bus latencies and delays such as those expected for ground-remote operation of Space Station robotic systems via the Tracking and Data Relay Satellite System (TDRSS) communication platform. The current work at JPL in this area has focused on enhancing the technologies and transferring the control architecture to hardware and software environments which are more compatible with projected ground and space operational environments. At the local site, the operator updates the remote worksite model using stereo video and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. This capability runs on a single Silicon Graphics Inc. machine. The operator can employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the intended object. The remote site controller, called the Modular Telerobot Task Execution System (MOTES), runs in a multi-processor VME environment and performs the task sequencing, task execution, trajectory generation, closed loop force/torque control, task parameter monitoring, and reflex action. This paper describes the new STELER architecture implementation, and also documents the results of the recent autonomous docking task execution using the local site and MOTES.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aurah, Mirwaise Y.; Roberts, Mark A.
Washington River Protection Solutions (WRPS), operator of High Level Radioactive Waste (HLW) Tank Farms at the Hanford Site, is taking an over 20-year leap in technology, replacing systems that were monitored with clipboards and obsolete computer systems, as well as solving major operations and maintenance hurdles in the area of process automation and information management. While WRPS is fully compliant with procedures and regulations, the current systems are not integrated and do not share data efficiently, hampering how information is obtained and managed.
NASA Technical Reports Server (NTRS)
Chinea, Anoushka Z.
1995-01-01
The Emergency Operation Center (EOC) is a site from which NASA LaRC Emergency Preparedness Officials exercise control and direction in an emergency. Research was conducted in order to determine what makes an effective EOC. Specifically information concerning the various types of equipment and communication capability that an efficient EOC should contain (i.e., computers, software, telephone systems, radio systems, etc.) was documented. With this information a requirements document was written stating a brief description of the equipment and required quantity to be used in an EOC and then compared to current capabilities at the NASA Langley Research Center.
Natural gas storage in bedded salt formations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Macha, G.
1996-09-01
In 1990 Western Resources Inc. (WRI) identified the need for additional natural gas storage capacity for its intrastate natural gas system operated in the state of Kansas. Western Resources primary need was identified as peak day deliverability with annual storage balancing a secondary objective. Consequently, an underground bedded salt storage facility, Yaggy Storage Field, was developed and placed in operation in November 1993. The current working capacity of the new field is 2.1 BCF. Seventy individual caverns are in service on the 300 acre site. The caverns vary in size from 310,000 CF to 2,600,000 CF. Additional capacity can bemore » added on the existing acreage by increasing the size of some of the smaller existing caverns by further solution mining and by development of an additional 30 potential well sites on the property.« less
Sakoda, Masahiko; Iino, Satoshi; Mataki, Yuko; Kawasaki, Yota; Kurahara, Hiroshi; Maemura, Kosei; Ueno, Shinichi; Natsugoe, Shoji
Antibiotic prophylaxis has been recommended to reduce post-operative infectious complications. Discontinuation of post-operative antibiotic administration within 24 hours of operation is currently recommended. Many surgeons, however, conventionally tend to extend the duration of prophylactic antibiotic use. In this study, we performed a retrospective analysis to assess the efficacy of extended post-operative antibiotic use in patients who underwent elective liver resection. A total of 208 consecutive patients who underwent liver resection without biliary reconstruction were investigated. Patients were divided into two groups according to the duration of post-operative antibiotic use: Only once after the operation (the post-operative day [POD] 0 group) and until three days after the operation (the POD 3 group). Post-operative complications in the two groups were analyzed and compared. Incisional surgical site infections (SSIs) were observed in 5% of the POD 0 group and 3% of the POD 3 group (p = 0.517). Organ/space SSIs were observed in 2% of the POD 0 group and 3% of the POD 3 group (p = 0.694). Overall infectious complications including SSIs and remote site infections were observed in 12% of the POD 0 group and 11% of the POD 3 group. Multi-variable analyses revealed that the short-term post-operative antibiotic regimen did not confer additional risk for infectious complications. In elective liver resection, the administration of prophylactic antibiotics on the operative day alone appears to be sufficient, because no additional benefit in the incidence of post-operative infectious complications was conferred on patients given antibiotic agents for three days.
Scatolini, Fabio; Alves, Cláudio Jorge Pinto
2016-01-01
ABSTRACT OBJECTIVE To perform a quantitative analysis of the background noise at Congonhas Airport surroundings based on large sampling and measurements with no interruption. METHODS Measuring sites were chosen from 62 and 72 DNL (day-night-level) noise contours, in urban sites compatible with residential use. Fifteen sites were monitored for at least 168 hours without interruption or seven consecutive days. Data compilation was based on cross-reference between noise measurements and air traffic control records, and results were validated by airport meteorological reports. Preliminary diagnoses were established using the standard NBR-13368. Background noise values were calculated based on the Sound Exposure Level (SEL). Statistic parameters were calculated in one-hour intervals. RESULTS Only four of the fifteen sites assessed presented aircraft operations as a clear cause for the noise annoyance. Even so, it is possible to detect background noise levels above regulation limits during periods of low airport activity or when it closes at night. CONCLUSIONS All the sites monitored showed background noise levels above regulation limits between 7:00 and 21:00. In the intervals between 6:00-6:59 and 21:00-22:59 the noise data, when analyzed with the current airport operational characteristics, still allow the development of additional mitigating measures. PMID:28099658
Flue gas desulfurization gypsum and fly ash
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-05-01
The Cumberland Fossil Plant (CUF) is located in Stewart County, Tennessee, and began commercial operation in 1972. This is the Tennessee Valley Authority`s newest fossil (coal-burning) steam electric generating plant. Under current operating conditions, the plant burns approximately seven million tons of coal annually. By-products from the combustion of coal are fly ash, approximately 428,000 tons annually, and bottom ash, approximately 115,000 tons annually. Based on historical load and projected ash production rates, a study was initially undertaken to identify feasible alternatives for marketing, utilization and disposal of ash by-products. The preferred alternative to ensure that facilities are planned formore » all by-products which will potentially be generated at CUF is to plan facilities to handle wet FGD gypsum and dry fly ash. A number of different sites were evaluated for their suitability for development as FGD gypsum and ash storage facilities. LAW Engineering was contracted to conduct onsite explorations of sites to develop information on the general mature of subsurface soil, rock and groundwater conditions in the site areas. Surveys were also conducted on each site to assess the presence of endangered and threatened species, wetlands and floodplains, archaeological and cultural resources, prime farmland and other site characteristics which must be considered from an environmental perspective.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-01
This document represents a Site-specific Standard Request for underground storage tanks (USTs) 1219-U,1222-U and 2082-U previously located at former Building 9754-1, and tank 2086-U previously located at Building 9720-15, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The tanks previously contained petroleum products. For the purposes of this report, the two building sites will be regarded as a single UST site and will be referred to as the Rust Garage Facility. The current land use associated with the Y-12 Plant is light industrial and the operational period of the plant is projected to be at least 30 years. Thus, potential futuremore » residential exposures are not expected to occur for at least 30 years. Based on the degradation coefficient for benzene (the only carcinogenic petroleum constituent detected in soils or groundwater at the Rust Garage Facility), it is expected that the benzene and other contaminants at the site will likely be reduced prior to expiration of the 30-year plant operational period. As the original sources of petroleum contamination have been removed, and the area of petroleum contamination is limited, a site-specific standard is therefore being requested for the Rust Garage Facility.« less
EPA Superfund Records of Decision (RODs) for Region 7: Iowa, Kansas, Missouri, and Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
EPA Superfund Records of Decision (RODs) for Region 10: Alaska, Idaho, Oregon, and Washington
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
Survey of existing underground openings for in-situ experimental facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wollenberg, H.; Graf, A.; Strisower, B.
1981-07-01
In an earlier project, a literature search identified 60 underground openings in crystalline rock capable of providing access for an in-situ experimental facility to develop geochemical and hydrological techniques for evaluating sites for radioactive waste isolation. As part of the current project, discussions with state geologists, owners, and operators narrowed the original group to 14. Three additional sites in volcanic rock and one site in granite were also identified. Site visits and application of technical criteria, including the geologic and hydrologic settings and depth, extent of the rock unit, condition, and accessibility of underground workings, determined four primary candidate sites:more » the Helms Pumped Storage Project in grandiodorite of the Sierra Nevada, California; the Tungsten Queen Mine in Precambrian granodiorite of the North Carolina Piedmont; the Mount Hope Mine in Precambrian granite and gneiss of northern New Jersey; and the Minnamax Project in the Duluth gabbro complex of northern Minnesota.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-09-28
The Independent Nail Company site, occupying 24.6 acres, is located near Beaufort, South Carolina. Land use in the vicinity of the site is a combination of fields, woodlands, and wetlands. Endangered and threatened species may occur within the area of influence of the site, although habitation has not been confirmed. The previous owners of the site, the Blake and Johnson Company, manufactured metallic screws and fasteners. In part of the manufacturing process, the company discharged approximately 33,000 gallons per day of plating wastewater into an unlined infiltration lagoon. The lagoon was in use from approximately 1969 to 1980. The Southmore » Carolina Department of Health and Environmental Control (SCDHEC) reported that the wastewater contained some organic cleaning solvents, phosphate, cyanide, chromium, cadmium, lead, mercury, nickel, zinc, copper and iron. In April 1980 the Blake and Johnson Company ceased operation. Two months later the Independent Nail Company purchased the plant. They currently operate a paneling nail coating process at the plant, but do not discharge any wastewater to the lagoon. The primary contaminants of concern to the soil and sediment include: cadmium, chromium, nickel and zinc.« less
Nucleation of shear bands in amorphous alloys
Perepezko, John H.; Imhoff, Seth D.; Chen, Ming-Wei; Wang, Jun-Qiang; Gonzalez, Sergio
2014-01-01
The initiation and propagation of shear bands is an important mode of localized inhomogeneous deformation that occurs in a wide range of materials. In metallic glasses, shear band development is considered to center on a structural heterogeneity, a shear transformation zone that evolves into a rapidly propagating shear band under a shear stress above a threshold. Deformation by shear bands is a nucleation-controlled process, but the initiation process is unclear. Here we use nanoindentation to probe shear band nucleation during loading by measuring the first pop-in event in the load–depth curve which is demonstrated to be associated with shear band formation. We analyze a large number of independent measurements on four different bulk metallic glasses (BMGs) alloys and reveal the operation of a bimodal distribution of the first pop-in loads that are associated with different shear band nucleation sites that operate at different stress levels below the glass transition temperature, Tg. The nucleation kinetics, the nucleation barriers, and the density for each site type have been determined. The discovery of multiple shear band nucleation sites challenges the current view of nucleation at a single type of site and offers opportunities for controlling the ductility of BMG alloys. PMID:24594599
Bjegovich-Weidman, Marija; Kahabka, Jill; Bock, Amy; Frick, Jacob; Kowalski, Helga; Mirro, Joseph
2012-03-01
Aurora Health Care (AHC) is the largest health care system in Wisconsin, with 14 acute care hospitals. In early 2010, a group of 18 medical oncologists became affiliated with AHC. This affiliation added 13 medical oncology infusion clinics to our existing 12 sites. In the era of health care reform and declining reimbursement, we need an objective method and criteria to evaluate our 25 outpatient medical oncology sites. We developed financial, clinical, and strategic tools for the evaluation and management of our cancer subservice lines and outpatient sites. The key to our success has been the direct involvement of stakeholders with a vested interest in the services in the selection of the criteria and evaluation process. We developed our objective metrics for evaluation based on strategic, financial, operational, and patient experience criteria. Strategic criteria included: population trends, full-time equivalent (FTE) medical oncologists/primary care physicians, FTE radiation oncologists, FTE oncologic surgeons, new annual cases of patients with cancer, and market share trends. Financial criteria per site included: physician work relative value units, staff FTE by type, staff salaries, and profit and loss. Operational criteria included: facility by type (clinic v hospital based), hours of operation, and facility detail (eg, No. of chairs, No. of procedure and examination rooms, square footage). Patient experience criteria included: nursing model primary/nurse navigators, multidisciplinary support at site, Press Ganey (South Bend, IN; health care performance improvement company) results, and employee engagement score. The outcome of our data analysis has resulted in the development of recommendations for AHC senior leadership and geographic market leadership to consider the consolidation of four sites (phase one, four sites; phase two, two sites) and priority strategic sites to address capacity issues that limit growth. The recommendations if implemented would result in significant cost savings, currently being quantified as a result of consolidation and improved efficiency. A reinvestment of these cost savings would be required to address facility expansion and program enhancement to maximize patient-centered expert care consistently across all of our remaining sites of service.
Characterization of the electrical output of flat-plate photovoltaic arrays
NASA Technical Reports Server (NTRS)
Gonzalez, C. C.; Hill, G. M.; Ross, R. G., Jr.
1982-01-01
The electric output of flat-plate photovoltaic arrays changes constantly, due primarily to changes in cell temperature and irradiance level. As a result, array loads such as direct-current to alternating-current power conditioners must be able to accommodate widely varying input levels, while maintaining operation at or near the array maximum power point.The results of an extensive computer simulation study that was used to define the parameters necessary for the systematic design of array/power-conditioner interfaces are presented as normalized ratios of power-conditioner parameters to array parameters, to make the results universally applicable to a wide variety of system sizes, sites, and operating modes. The advantages of maximum power tracking and a technique for computing average annual power-conditioner efficiency are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanrahan, T.P.
2009-01-08
The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physicalmore » characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Escapement estimates for fall of 2000 indicate more than 9000 adult fall Chinook salmon returned to this area, accounting for more than 2100 redds within a 5 km section of river.« less
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2010-10-26
Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current yearmore » and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.« less
1981-03-20
There are no croplands within the study area. Oil and gas leases are widely scattered in the area, and deep tests are currently being drilled. There...sightings from Uinta Basin in 1972 and 1975, from New Green River, Utah, in 1976, and from Rich and Emery counties in 1977 and 1978. The primary prey...located in a transitional area between the Great Basin and the Mojave Desert, and it contains vegeta- tion representative of both regions. Plant and
Clean-ups at Aberdeen Proving Ground
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cardenuto, R.A.
1994-12-31
The Department of Defense has utilized radiative material in numerous applications over several decades. Aberdeen Proving Ground has been an integral player in the Army`s Research, Development, and Testing of items incorporating radionuclides, as well as developing new and innovative applications. As new information becomes available and society progresses, we find that the best management practices used decades, or even sometimes years earlier are inadequate to meet the current demands. Aberdeen Proving Ground is committed to remediating historic disposal sites, and utilizing the best available technology in current operations to prevent future adverse impact. Two projects which are currently ongoingmore » at Aberdeen Proving Ground illustrates these points. The first, the remediation of contaminated metal storage areas, depicts how available technology has provided a means for recycling material whereby preventing the continued stock piling, and allowing for the decommissioning of the areas. The second, the 26Th Street Disposal Site Removal Action, shows how historic methods of disposition were inadequate to meet today`s needs.« less
Cargo/Logistics Airlift System Study (CLASS), Volume 1
NASA Technical Reports Server (NTRS)
Norman, J. M.; Henderson, R. D.; Macey, F. C.; Tuttle, R. P.
1978-01-01
Current and advanced air cargo systems are evaluated using industrial and consumer statistics. Market and commodity characteristics that influence the use of the air mode are discussed along with a comparison of air and surface mode on typical routes. Results of on-site surveys of cargo processing facilities at airports are presented, and institutional controls and influences on air cargo operations are considered.
DWPF Safely Dispositioning Liquid Waste
None
2018-06-21
The only operating radioactive waste glassification plant in the nation, the Defense Waste Processing Facility (DWPF) converts the liquid radioactive waste currently stored at the Savannah River Site (SRS) into a solid glass form suitable for long-term storage and disposal. Scientists have long considered this glassification process, called âvitrification,â as the preferred option for treating liquid radioactive waste.
41 CFR 102-173.45 - Is there a registration charge for domain names?
Code of Federal Regulations, 2011 CFR
2011-01-01
...-INTERNET GOV DOMAIN Registration § 102-173.45 Is there a registration charge for domain names? The General... operations. For current registration charges, please visit the GSA Web site at http://www.nic.gov. GSA does... that may be provided by GSA, and a recurring annual charge that will not exceed $500 for all dot-gov...
41 CFR 102-173.45 - Is there a registration charge for domain names?
Code of Federal Regulations, 2013 CFR
2013-07-01
...-INTERNET GOV DOMAIN Registration § 102-173.45 Is there a registration charge for domain names? The General... operations. For current registration charges, please visit the GSA Web site at http://www.nic.gov. GSA does... that may be provided by GSA, and a recurring annual charge that will not exceed $500 for all dot-gov...
41 CFR 102-173.45 - Is there a registration charge for domain names?
Code of Federal Regulations, 2010 CFR
2010-07-01
...-INTERNET GOV DOMAIN Registration § 102-173.45 Is there a registration charge for domain names? The General... operations. For current registration charges, please visit the GSA Web site at http://www.nic.gov. GSA does... that may be provided by GSA, and a recurring annual charge that will not exceed $500 for all dot-gov...
41 CFR 102-173.45 - Is there a registration charge for domain names?
Code of Federal Regulations, 2014 CFR
2014-01-01
...-INTERNET GOV DOMAIN Registration § 102-173.45 Is there a registration charge for domain names? The General... operations. For current registration charges, please visit the GSA Web site at http://www.nic.gov. GSA does... that may be provided by GSA, and a recurring annual charge that will not exceed $500 for all dot-gov...
41 CFR 102-173.45 - Is there a registration charge for domain names?
Code of Federal Regulations, 2012 CFR
2012-01-01
...-INTERNET GOV DOMAIN Registration § 102-173.45 Is there a registration charge for domain names? The General... operations. For current registration charges, please visit the GSA Web site at http://www.nic.gov. GSA does... that may be provided by GSA, and a recurring annual charge that will not exceed $500 for all dot-gov...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2008-01-24
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request an account on the local site data system. The eight research computers are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the DMF at PNNL; and the AMF, currently in Germany. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Due to the similarity of ACRF NSA data streams, and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period January 1, 2007 - December 31, 2007. Table 2 shows the summary of cumulative users for the period January 1, 2007 - December 31, 2007. For the first quarter of FY 2008, the overall number of users was up significantly from the last reporting period. For the fourth consecutive reporting period, a record high number of Archive users was recorded. In addition, the number of visitors and visitor days set a new record this reporting period particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany. It is interesting to note this quarter that 22% (a slight decrease from last quarter) of the Archive users are ARM Science funded principal investigators and 35% (the same as last quarter) of all other facility users are either ARM Science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period October 1 - December 31, 2007. There were no incidents this reporting period.« less
Discharge measurements using a broad-band acoustic Doppler current profiler
Simpson, Michael R.
2002-01-01
The measurement of unsteady or tidally affected flow has been a problem faced by hydrologists for many years. Dynamic discharge conditions impose an unreasonably short time constraint on conventional current-meter discharge-measurement methods, which typically last a minimum of 1 hour. Tidally affected discharge can change more than 100 percent during a 10-minute period. Over the years, the U.S. Geological Survey (USGS) has developed moving-boat discharge-measurement techniques that are much faster but less accurate than conventional methods. For a bibliography of conventional moving-boat publications, see Simpson and Oltmann (1993, page 17). The advent of the acoustic Doppler current profiler (ADCP) made possible the development of a discharge-measurement system capable of more accurately measuring unsteady or tidally affected flow. In most cases, an ADCP discharge-measurement system is dramatically faster than conventional discharge-measurement systems, and has comparable or better accuracy. In many cases, an ADCP discharge-measurement system is the only choice for use at a particular measurement site. ADCP systems are not yet ?turnkey;? they are still under development, and for proper operation, require a significant amount of operator training. Not only must the operator have a rudimentary knowledge of acoustic physics, but also a working knowledge of ADCP operation, the manufacturer's discharge-measurement software, and boating techniques and safety.
A teleoperated system for remote site characterization
NASA Technical Reports Server (NTRS)
Sandness, Gerald A.; Richardson, Bradley S.; Pence, Jon
1994-01-01
The detection and characterization of buried objects and materials is an important step in the restoration of burial sites containing chemical and radioactive waste materials at Department of Energy (DOE) and Department of Defense (DOD) facilities. By performing these tasks with remotely controlled sensors, it is possible to obtain improved data quality and consistency as well as enhanced safety for on-site workers. Therefore, the DOE Office of Technology Development and the US Army Environmental Center have jointly supported the development of the Remote Characterization System (RCS). One of the main components of the RCS is a small remotely driven survey vehicle that can transport various combinations of geophysical and radiological sensors. Currently implemented sensors include ground-penetrating radar, magnetometers, an electromagnetic induction sensor, and a sodium iodide radiation detector. The survey vehicle was constructed predominantly of non-metallic materials to minimize its effect on the operation of its geophysical sensors. The system operator controls the vehicle from a remote, truck-mounted, base station. Video images are transmitted to the base station by a radio link to give the operator necessary visual information. Vehicle control commands, tracking information, and sensor data are transmitted between the survey vehicle and the base station by means of a radio ethernet link. Precise vehicle tracking coordinates are provided by a differential Global Positioning System (GPS).
Extended Magnetic Reconnection Across the Dayside Magnetopause
NASA Technical Reports Server (NTRS)
Dunlop, M. W.; Zhang, Q.-H.; Bogdanova, Y. V.; Lockwood, M.; Pu, Z.; Hasegawa, H.; Wang, J.; Taylor, M. G. G. T.; Berchem, J.; Lavraund, B.;
2011-01-01
The extent of where magnetic reconnection (MR), the dominant process responsible for energy and plasma transport into the magnetosphere, operates across Earth's dayside magnetopause has previously been only indirectly shown by observations. We report the first direct evidence of X-line structure resulting from the operation of MR at each of two widely separated locations along the tilted, subsolar line of maximum current on Earth's magnetopause, confirming the operation of MR at two or more sites across the extended region where MR is expected to occur. The evidence results from in-situ observations of the associated ion and electron plasma distributions, present within each magnetic X-line structure, taken by two spacecraft passing through the active MR regions simultaneously.
Monitoring and mapping selected riparian habitat along the lower Snake River
DOE Office of Scientific and Technical Information (OSTI.GOV)
Downs, J. L; Tiller, B. L; Witter, M.
Studies in this document were initiated to establish baseline information on riparian and wetland habitat conditions at the areas studied under the current reservoir operations on the lower Snake River. Two approaches were used to assess habitat at 28 study sites selected on the four pools on the lower Snake River. These areas all contribute significant riparian habitat along the river, and several of these areas are designated habitat management units. At 14 of the 28 sites, we monitored riparian habitat on three dates during the growing season to quantify vegetation abundance and composition along three transects: soil nutrients, moisture,more » and pH and water level and pH. A second approach involved identifying any differences in the extent and amount of riparian/wetland habitat currently found at the study areas from that previously documented. We used both ground and boat surveys to map and classify the changes in vegetative cover along the shoreline at the 14 monitoring sites and at 14 additional sites along the lower Snake selected to represent various riparian/wetland habitat conditions. Results of these mapping efforts are compared with maps of cover types previously generated using aerial photography taken in 1987.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
L. M. Dittmer
2007-08-30
The 1607-B1 Septic System includes a septic tank, drain field, and associated connecting pipelines and influent sanitary sewer lines. This septic system serviced the former 1701-B Badgehouse, 1720-B Patrol Building/Change Room, and the 1709-B Fire Headquarters. The 1607-B1 waste site received unknown amounts of nonhazardous, nonradioactive sanitary sewage from these facilities during its operational history from 1944 to approximately 1970. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. Themore » results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Public Health Assessment of Sola Optical USA, Inc. is based on a review of the Remedial Investigation report and the Public Health Risk Assessment. The Sola Optical USA, Inc. (Sola) site, located in Petaluma, Sonoma County, California, was placed on the National Priorities List by the EPA on June, 1988. The EPA is the lead governmental agency for the cleanup at the Sola site. Spillage associated with six underground solvent storage tanks resulted in volatile organic contaminants (VOCs) leaking into the subsurface soils and groundwater. These underground tanks and some of the surrounding contaminated soil have been excavated andmore » removed from the site. Various VOCs have been detected in on-site groundwater at levels of human health concern; however the contaminated groundwater is not currently a source of drinking water. An on-site groundwater extraction and treatment system has been in operation since 1987. Based on information reviewed, ATSDR and CDHS have concluded that the Sola site poses no apparent public health hazard.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Leslie A.
2006-09-19
This biological assessment considers the effects of continuing to operate Los Alamos National Laboratory on Federally listed threatened or endangered species, based on current and future operations identified in the 2006 Site-wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (SWEIS; DOE In Prep.). We reviewed 40 projects analyzed in the SWEIS as well as two aspects on ongoing operations to determine if these actions had the potential to affect Federally listed species. Eighteen projects that had not already received U.S. Fish and Wildlife Service (USFWS) consultation and concurrence, as well as the two aspects ofmore » ongoing operations, ecological risk from legacy contaminants and the Outfall Reduction Project, were determined to have the potential to affect threatened or endangered species. Cumulative impacts were also analyzed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, V.A.; Beach, J.A.; Statham, W.H.
The Savannah River Site (SRS) is a Department of Energy (DOE) facility located near Aiken, South Carolina which is currently operated and managed by Westinghouse Savannah River Company (WSRC). The Sanitary Landfill (Sanitary Landfill) at the SRS is located approximately 2,000 feet Northwest of Upper Three Runs Creek (UTRC) on an approximately 70 acre site located south of Road C between the SRS B-Area and UTRC. The Sanitary Landfill has been receiving wastes since 1974 and operates as an unlined trench and fill operation. The original landfill site was 32 acres. This area reached its capacity around 1987 and amore » Northern Expansion of 16 acres and a Southern Expansion of 22 acres were added in 1987. The Northern Expansion has not been used for waste disposal to date and the Southern Expansion is expected to reach capacity in 1992 or 1993. The waste received at the Sanitary Landfill is predominantly paper, plastics, rubber, wood, metal, cardboard, rags saturated with degreasing solvents, pesticide bags, empty cans, and asbestos in bags. The landfill is not supposed to receive any radioactive wastes. However, tritium has been detected in the groundwater at the site. Gross alpha and gross beta are also evaluated at the landfill. The objectives of this modeling study are twofold: (1) to create a local scale Sanitary Landfill flow model to study hydraulic effects resulting from capping the Sanitary Landfill; and (2) to create a Sanitary Landfill local scale transport model to support ACL Demonstrations for a RCRA Part B Permit Renewal.« less
NASA Astrophysics Data System (ADS)
Hwang, Ihn; Wang, Wei; Hwang, Sun Kak; Cho, Sung Hwan; Kim, Kang Lib; Jeong, Beomjin; Huh, June; Park, Cheolmin
2016-05-01
The characteristic source-drain current hysteresis frequently observed in field-effect transistors with networked single walled carbon-nanotube (NSWNT) channels is problematic for the reliable switching and sensing performance of devices. But the two distinct current states of the hysteresis curve at a zero gate voltage can be useful for memory applications. In this work, we demonstrate a novel non-volatile transistor memory with solution-processed NSWNTs which are suitable for multilevel data programming and reading. A polymer passivation layer with a small amount of water employed on the top of the NSWNT channel serves as an efficient gate voltage dependent charge trapping and de-trapping site. A systematic investigation evidences that the water mixed in a polymer passivation solution is critical for reliable non-volatile memory operation. The optimized device is air-stable and temperature-resistive up to 80 °C and exhibits excellent non-volatile memory performance with an on/off current ratio greater than 104, a switching time less than 100 ms, data retention longer than 4000 s, and write/read endurance over 100 cycles. Furthermore, the gate voltage dependent charge injection mediated by water in the passivation layer allowed for multilevel operation of our memory in which 4 distinct current states were programmed repetitively and preserved over a long time period.The characteristic source-drain current hysteresis frequently observed in field-effect transistors with networked single walled carbon-nanotube (NSWNT) channels is problematic for the reliable switching and sensing performance of devices. But the two distinct current states of the hysteresis curve at a zero gate voltage can be useful for memory applications. In this work, we demonstrate a novel non-volatile transistor memory with solution-processed NSWNTs which are suitable for multilevel data programming and reading. A polymer passivation layer with a small amount of water employed on the top of the NSWNT channel serves as an efficient gate voltage dependent charge trapping and de-trapping site. A systematic investigation evidences that the water mixed in a polymer passivation solution is critical for reliable non-volatile memory operation. The optimized device is air-stable and temperature-resistive up to 80 °C and exhibits excellent non-volatile memory performance with an on/off current ratio greater than 104, a switching time less than 100 ms, data retention longer than 4000 s, and write/read endurance over 100 cycles. Furthermore, the gate voltage dependent charge injection mediated by water in the passivation layer allowed for multilevel operation of our memory in which 4 distinct current states were programmed repetitively and preserved over a long time period. Electronic supplementary information (ESI) available. See DOI: 10.1039/c6nr00505e
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2009-10-15
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.« less
Burton, Bethany L.; Ball, Lyndsay B.
2011-01-01
Red Devil Mine, located in southwestern Alaska near the Village of Red Devil, was the state's largest producer of mercury and operated from 1933 to 1971. Throughout the lifespan of the mine, various generations of mills and retort buildings existed on both sides of Red Devil Creek, and the tailings and waste rock were deposited across the site. The mine was located on public Bureau of Land Management property, and the Bureau has begun site remediation by addressing mercury, arsenic, and antimony contamination caused by the minerals associated with the ore deposit (cinnabar, stibnite, realgar, and orpiment). In August 2010, the U.S. Geological Survey completed a geophysical survey at the site using direct-current resistivity and electromagnetic induction surface methods. Eight two-dimensional profiles and one three-dimensional grid of direct-current resistivity data as well as about 5.7 kilometers of electromagnetic induction profile data were acquired across the site. On the basis of the geophysical data and few available soil borings, there is not sufficient electrical or electromagnetic contrast to confidently distinguish between tailings, waste rock, and weathered bedrock. A water table is interpreted along the two-dimensional direct-current resistivity profiles based on correlation with monitoring well water levels and a relatively consistent decrease in resistivity typically at 2-6 meters depth. Three settling ponds used in the last few years of mine operation to capture silt and sand from a flotation ore processing technique possessed conductive values above the interpreted water level but more resistive values below the water level. The cause of the increased resistivity below the water table is unknown, but the increased resistivity may indicate that a secondary mechanism is affecting the resistivity structure under these ponds if the depth of the ponds is expected to extend below the water level. The electromagnetic induction data clearly identified the three monofills and indicate, in conjunction with the three-dimensional resistivity data, additional possible landfill features on the north side of Red Devil Creek. No obvious shallow feature was identified as a possible source for a spring that is feeding into Red Devil Creek from the north bank. However, a discrete, nearly vertical conductive feature observed on the direct-current resistivity line that passes within 5 meters of the spring may be worth investigating. Additional deep soil borings that better differentiate between tailings, waste rock, and weathered bedrock may be very useful in more confidently identifying these rock types in the direct-current resistivity data.
Holzrichter, J.F.; Siekhaus, W.J.
1997-04-15
A scanning probe microscope, such as an atomic force microscope (AFM) or a scanning tunneling microscope (STM), is operated in a stationary mode on a site where an activity of interest occurs to measure and identify characteristic time-varying micromotions caused by biological, chemical, mechanical, electrical, optical, or physical processes. The tip and cantilever assembly of an AFM is used as a micromechanical detector of characteristic micromotions transmitted either directly by a site of interest or indirectly through the surrounding medium. Alternatively, the exponential dependence of the tunneling current on the size of the gap in the STM is used to detect micromechanical movement. The stationary mode of operation can be used to observe dynamic biological processes in real time and in a natural environment, such as polymerase processing of DNA for determining the sequence of a DNA molecule. 6 figs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 50-acre South Andover site is composed of several privately owned parcels of land near Minneapolis in Anoka County, Minnesota. There are several source areas where former activities included drum storage, waste storage, and waste burning. Solid and liquid chemical waste dumping and open pit burning of solvents occurred during the 1960's and 1970's. Investigations showed that drum storage and chemical waste disposal sites were partially obscured by auto salvage operations and more than 3 million waste tires. The ROD amendment changes the 1988 ROD for ground water based on current data from a 1990 Design Investigation. The primary contaminantsmore » of concern affecting the ground water are VOCs, including acetone, ethyl benzene, methylchloride, PCE, TCE, toluene; and metals, including arsenic, chromium, and lead.« less
Holzrichter, John F.; Siekhaus, Wigbert J.
1997-01-01
A scanning probe microscope, such as an atomic force microscope (AFM) or a scanning tunneling microscope (STM), is operated in a stationary mode on a site where an activity of interest occurs to measure and identify characteristic time-varying micromotions caused by biological, chemical, mechanical, electrical, optical, or physical processes. The tip and cantilever assembly of an AFM is used as a micromechanical detector of characteristic micromotions transmitted either directly by a site of interest or indirectly through the surrounding medium. Alternatively, the exponential dependence of the tunneling current on the size of the gap in the STM is used to detect micromechanical movement. The stationary mode of operation can be used to observe dynamic biological processes in real time and in a natural environment, such as polymerase processing of DNA for determining the sequence of a DNA molecule.
Discharge transient coupling in large space power systems
NASA Technical Reports Server (NTRS)
Stevens, N. John; Stillwell, R. P.
1990-01-01
Experiments have shown that plasma environments can induce discharges in solar arrays. These plasmas simulate the environments found in low earth orbits where current plans call for operation of very large power systems. The discharges could be large enough to couple into the power system and possibly disrupt operations. Here, the general concepts of the discharge mechanism and the techniques of coupling are discussed. Data from both ground and flight experiments are reviewed to obtain an expected basis for the interactions. These concepts were applied to the Space Station solar array and distribution system as an example of the large space power system. The effect of discharges was found to be a function of the discharge site. For most sites in the array discharges would not seriously impact performance. One location at the negative end of the array was identified as a position where discharges could couple to charge stored in system capacitors. This latter case could impact performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUECK, K.J.
2004-10-18
This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dam, William; Gil, Dr. April; Johnson, Raymond H.
The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlinedmore » tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a downgradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment–water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies.« less
Wide operating window spin-torque majority gate towards large-scale integration of logic circuits
NASA Astrophysics Data System (ADS)
Vaysset, Adrien; Zografos, Odysseas; Manfrini, Mauricio; Mocuta, Dan; Radu, Iuliana P.
2018-05-01
Spin Torque Majority Gate (STMG) is a logic concept that inherits the non-volatility and the compact size of MRAM devices. In the original STMG design, the operating range was restricted to very small size and anisotropy, due to the exchange-driven character of domain expansion. Here, we propose an improved STMG concept where the domain wall is driven with current. Thus, input switching and domain wall propagation are decoupled, leading to higher energy efficiency and allowing greater technological optimization. To ensure majority operation, pinning sites are introduced. We observe through micromagnetic simulations that the new structure works for all input combinations, regardless of the initial state. Contrary to the original concept, the working condition is only given by threshold and depinning currents. Moreover, cascading is now possible over long distances and fan-out is demonstrated. Therefore, this improved STMG concept is ready to build complete Boolean circuits in absence of external magnetic fields.
NASA Technical Reports Server (NTRS)
Zanley, Nancy L.
1991-01-01
The NASA Science Internet (NSI) Network Operations Staff is responsible for providing reliable communication connectivity for the NASA science community. As the NSI user community expands, so does the demand for greater interoperability with users and resources on other networks (e.g., NSFnet, ESnet), both nationally and internationally. Coupled with the science community's demand for greater access to other resources is the demand for more reliable communication connectivity. Recognizing this, the NASA Science Internet Project Office (NSIPO) expands its Operations activities. By January 1990, Network Operations was equipped with a telephone hotline, and its staff was expanded to six Network Operations Analysts. These six analysts provide 24-hour-a-day, 7-day-a-week coverage to assist site managers with problem determination and resolution. The NSI Operations staff monitors network circuits and their associated routers. In most instances, NSI Operations diagnoses and reports problems before users realize a problem exists. Monitoring of the NSI TCP/IP Network is currently being done with Proteon's Overview monitoring system. The Overview monitoring system displays a map of the NSI network utilizing various colors to indicate the conditions of the components being monitored. Each node or site is polled via the Simple Network Monitoring Protocol (SNMP). If a circuit goes down, Overview alerts the Network Operations staff with an audible alarm and changes the color of the component. When an alert is received, Network Operations personnel immediately verify and diagnose the problem, coordinate repair with other networking service groups, track problems, and document problem and resolution into a trouble ticket data base. NSI Operations offers the NSI science community reliable connectivity by exercising prompt assessment and resolution of network problems.
Central Facilities Area Sewage Lagoon Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Mark R.
2013-12-01
The Central Facilities Area (CFA), located in Butte County, Idaho, at the Idaho National Laboratory has an existing wastewater system to collect and treat sanitary wastewater and non-contact cooling water from the facility. The existing treatment facility consists of three cells: Cell #1 has a surface area of 1.7 acres, Cell #2 has a surface area of 10.3 acres, and Cell #3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5-acre land application site that uses a center-pivot irrigation sprinkler system. As flows at CFA have decreasedmore » in recent years, the amount of wastewater discharged to the land application site has decreased from 13.64 million gallons in 2004 to no discharge in 2012 and 2013. In addition to the decreasing need for land application, approximately 7.7 MG of supplemental water was added to the system in 2013 to maintain a water level and prevent the clay soil liners in the cells from drying out and “cracking.” The Idaho National Laboratory is concerned that the sewage lagoons and land application site may be oversized for current and future flows. A further concern is the sustainability of the large volumes of supplemental water that are added to the system according to current operational practices. Therefore, this study was initiated to evaluate the system capacity, operational practices, and potential improvement alternatives, as warranted.« less
Alarm upgrade meets new standards.
2004-11-01
When Bedford Hospital NHS Trust decided to replace its ageing and increasingly unreliable fire detection and alarm system, it was looking to achieve more than just compliance with the latest regulations. It wanted a flexible, state-of-the-art system that would not only meet its current requirements but would also be easy to adapt and inexpensive to maintain. The pound 1 million Gent Vigilon fire system now operating across the site has given it just that. The 15-month long project to install the system was completed without a single ward or operating theatre having to be shut down.
Overview and Status of the Laser Communication Relay Demonstration
NASA Technical Reports Server (NTRS)
Luzhanskiy, E.; Edwards, B.; Israel, D.; Cornwell, D.; Staren, J.; Cummings, N.; Roberts, T.; Patschke, R.
2016-01-01
NASA is presently developing first all optical high data rate satellite relay system, LCRD. To be flown on commercial geosynchronous satellite, it will communicate at DPSK and PPM modulation formats up to 1.244 Gbps. LCRD flight payload is being developed by NASA's Goddard Space Flight Center. The two ground stations, one on Table Mountain in CA, developed by NASA's Jet Propulsion Laboratory and another on Hawaiian island will enable bi-directional relay operation and ground sites diversity experiments. In this paper we will report on the current state of LCRD system development, planned operational scenarios and expected system performance.
Enhanced performance of the Westinghouse Series 1000 Mobile Satellite Telephone System
NASA Technical Reports Server (NTRS)
Martinson, Richard E.
1995-01-01
The Westinghouse Series 1000 Mobile Satellite Telephone System is designed for land mobile, maritime, and fixed site land applications. The product currently operates on the Optus Mobilesat system in Australia and will operate on American Mobile Satellite Corporation's (AMSC) Skycell service in the U.S. and TMI Communications' (TMIC) MSAT service in Canada. The architecture allows the same transceiver electronics to be used for diverse mobile applications. Advanced antenna designs have made land mobile satellite communications a reality. This paper details the unique high performance product and its configuration for the vehicle mounted land mobile application.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fisher, R. E.; Buehring, W. A.; Whitfield, R. G.
2009-10-14
The US Department of Homeland Security (DHS) has directed its Protective Security Advisors (PSAs) to form partnerships with the owners and operators of assets most essential to the Nation's well being - a subclass of critical infrastructure and key resources (CIKR) - and to conduct site visits for these and other high-risk assets as part of the Enhanced Critical Infrastructure Protection (ECIP) Program. During each such visit, the PSA documents information about the facility's current CIKR protection posture and overall security awareness. The primary goals for ECIP site visits (DHS 2009) are to: (1) inform facility owners and operators ofmore » the importance of their facilities as an identified high-priority CIKR and the need to be vigilant in light of the ever-present threat of terrorism; (2) identify protective measures currently in place at these facilities, provide comparisons of CIKR protection postures across like assets, and track the implementation of new protective measures; and (3) enhance existing relationships among facility owners and operators; DHS; and various Federal, State, local tribal, and territorial partners. PSAs conduct ECIP visits to assess overall site security; educate facility owners and operators about security; help owners and operators identify gaps and potential improvements; and promote communication and information sharing among facility owners and operators, DHS, State governments, and other security partners. Information collected during ECIP visits is used to develop metrics; conduct sector-by-sector and cross-sector vulnerability comparisons; identify security gaps and trends across CIKR sectors and subsectors; establish sector baseline security survey results; and track progress toward improving CIKR security through activities, programs, outreach, and training (Snyder 2009). The data being collected are used in a framework consistent with the National Infrastructure Protection Plan (NIPP) risk criteria (DHS 2009). The NIPP framework incorporates consequence, threat, and vulnerability components and addresses all hazards. The analysis of the vulnerability data needs to be reproducible, support risk analysis, and go beyond protection. It also needs to address important security/vulnerability topics, such as physical security, cyber security, systems analysis, and dependencies and interdependencies. This report provides an overview of the approach being developed to estimate vulnerability and provide vulnerability comparisons for sectors and subsectors. the information will be used to assist DHS in analyzing existing protective measures and vulnerability at facilities, to identify potential ways to reduce vulnerabilities, and to assist in preparing sector risk estimates. The owner/operator receives an analysis of the data collected for a specific asset, showing a comparison between the facility's protection posture/vulnerability index and those of DHS sector/subsector sites visited. This comparison gives the owner/operator an indication of the asset's security strengths and weaknesses that may be contributing factors to its vulnerability and protection posture. The information provided to the owner/operator shows how the asset compares to other similar assets within the asset's sector or subsector. A 'dashboard' display is used to illustrate the results in a convenient format. The dashboard allows the owner/operator to analyze the implementation of additional protective measures and to illustrate how such actions would impact the asset's Protective Measures Index (PMI) or Vulnerability Index (VI).« less
Adopt-A-Highway, Statewide M & O, Transportation & Public Facilities, State
& Operations Search DOT&PF State of Alaska DOT&PF > Maintenance & Operations > Maintenance Subcommittee off site link FHWA Operations off site link U.S. DOT off site link Site Map Policies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, E.C.; Killough, S.M.; Rowe, J.C.
The purpose of the Smart Crane Ammunition Transfer System (SCATS) project is to demonstrate robotic/telerobotic controls technology for a mobile articulated crane for missile/munitions handling, delivery, and reload. Missile resupply and reload have been manually intensive operations up to this time. Currently, reload missiles are delivered by truck to the site of the launcher. A crew of four to five personnel reloads the missiles from the truck to the launcher using a hydraulic-powered crane. The missiles are handled carefully for the safety of the missiles and personnel. Numerous steps are required in the reload process and the entire reload operationmore » can take over an hour for some missile systems. Recent US Army directives require the entire operation to be accomplished in a fraction of that time. Current development of SCATS is being based primarily on reloading Patriot missiles. This paper summarizes the current status of the SCATS project at the Oak Ridge National Laboratory (ORNL). Additional information on project background and requirements has been described previously (Bradley, et al., 1995).« less
Current legal and institutional issues in the commercialization of phosphoric acid fuel cells
NASA Technical Reports Server (NTRS)
Nimmons, J. T.; Sheehy, K. D.; Singer, J. R.; Gardner, T. C.
1982-01-01
Legal and institutional factors affecting the development and commercial diffusion of phosphoric acid fuel cells are assessed. Issues for future research and action are suggested. Perceived barriers and potential opportunities for fuel cells in central and dispersed utility operations and on-site applications are reviewed, as well as the general concept of commercialization as applied to emerging energy technologies.
A Pilot Tsunami Inundation Forecast System for Australia
NASA Astrophysics Data System (ADS)
Allen, Stewart C. R.; Greenslade, Diana J. M.
2016-12-01
The Joint Australian Tsunami Warning Centre (JATWC) provides a tsunami warning service for Australia. Warnings are currently issued according to a technique that does not include explicit modelling at the coastline, including any potential coastal inundation. This paper investigates the feasibility of developing and implementing tsunami inundation modelling as part of the JATWC warning system. An inundation model was developed for a site in Southeast Australia, on the basis of the availability of bathymetric and topographic data and observations of past tsunamis. The model was forced using data from T2, the operational deep-water tsunami scenario database currently used for generating warnings. The model was evaluated not only for its accuracy but also for its computational speed, particularly with respect to operational applications. Limitations of the proposed forecast processes in the Australian context and areas requiring future improvement are discussed.
NASA Astrophysics Data System (ADS)
Yoon, S.
2016-12-01
To define geodetic reference frame using GPS data collected by Continuously Operating Reference Stations (CORS) network, historical GPS data needs to be reprocessed regularly. Reprocessing GPS data collected by upto 2000 CORS sites for the last two decades requires a lot of computational resource. At National Geodetic Survey (NGS), there has been one completed reprocessing in 2011, and currently, the second reprocessing is undergoing. For the first reprocessing effort, in-house computing resource was utilized. In the current second reprocessing effort, outsourced cloud computing platform is being utilized. In this presentation, the outline of data processing strategy at NGS is described as well as the effort to parallelize the data processing procedure in order to maximize the benefit of the cloud computing. The time and cost savings realized by utilizing cloud computing approach will also be discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Halliwell, Stephen
2012-07-01
At the Hanford site, in the 1950's and 60's, radioactive waste materials, including Transuranic (TRU) wastes from a number of laboratories were stored in vertical pipe units (VPUs) in what are now the 618-10 and 618-11 burial grounds. Although the current physical condition of the VPUs is unknown, initial R and D studies had shown that in-ground size reduction and stabilization of VPU contents was feasible. This paper describes the R and D work and testing activities to validate the concept of in-ground size reduction and stabilization of VPU contents, and the design and pre-testing of major plant items andmore » augering systems on full size simulated VPUs. The paper also describes the full size prototype equipment which will be used in full size cold testing of simulated VPUs off the Hanford site, to prove the equipment, develop operating procedures, and train operators prior to deployment on site. Safe and effective field remediation, removal and disposal of the VPUs in the 600 area are critical to the success of the River Corridor Closure Contract at the U.S. Department of Energy's Hanford Site. Safe and effective field remediation, removal and disposal of the VPUs in the 600 area are critical to the success of the River Corridor Closure Contract at the U.S. Department of Energy's Hanford Site. (authors)« less
Storageless and caching Tier-2 models in the UK context
NASA Astrophysics Data System (ADS)
Cadellin Skipsey, Samuel; Dewhurst, Alastair; Crooks, David; MacMahon, Ewan; Roy, Gareth; Smith, Oliver; Mohammed, Kashif; Brew, Chris; Britton, David
2017-10-01
Operational and other pressures have lead to WLCG experiments moving increasingly to a stratified model for Tier-2 resources, where “fat” Tier-2s (“T2Ds”) and “thin” Tier-2s (“T2Cs”) provide different levels of service. In the UK, this distinction is also encouraged by the terms of the current GridPP5 funding model. In anticipation of this, testing has been performed on the implications, and potential implementation, of such a distinction in our resources. In particular, this presentation presents the results of testing of storage T2Cs, where the “thin” nature is expressed by the site having either no local data storage, or only a thin caching layer; data is streamed or copied from a “nearby” T2D when needed by jobs. In OSG, this model has been adopted successfully for CMS AAA sites; but the network topology and capacity in the USA is significantly different to that in the UK (and much of Europe). We present the result of several operational tests: the in-production University College London (UCL) site, which runs ATLAS workloads using storage at the Queen Mary University of London (QMUL) site; the Oxford site, which has had scaling tests performed against T2Ds in various locations in the UK (to test network effects); and the Durham site, which has been testing the specific ATLAS caching solution of “Rucio Cache” integration with ARC’s caching layer.
Closure of the R Reactor Disassembly Basin at the SRS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austin, W.E.
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less
Smart Cruise Control: UAV sensor operator intent estimation and its application
NASA Astrophysics Data System (ADS)
Cheng, Hui; Butler, Darren; Kumar, Rakesh
2006-05-01
Due to their long endurance, superior mobility and the low risk posed to the pilot and sensor operator, UAVs have become the preferred platform for persistent ISR missions. However, currently most UAV based ISR missions are conducted through manual operation. Event the simplest tasks, such as vehicle tracking, route reconnaissance and site monitoring, need the sensor operator's undivided attention and constant adjustment of the sensor control. The lack of autonomous behaviour greatly limits of the effectiveness and the capability of UAV-based ISR, especially the use of a large number of UAVs simultaneously. Although fully autonomous UAV based ISR system is desirable, it is still a distant dream due to the complexity and diversity of combat and ISR missions. In this paper, we propose a Smart Cruise Control system that can learn UAV sensor operator's intent and use it to complete tasks automatically, such as route reconnaissance and site monitoring. Using an operator attention model, the proposed system can estimate the operator's intent from how they control the sensor (e.g. camera) and the content of the imagery that is acquired. Therefore, for example, from initially manually controlling the UAV sensor to follow a road, the system can learn not only the preferred operation, "tracking", but also the road appearance, "what to track" in real-time. Then, the learnt models of both road and the desired operation can be used to complete the task automatically. We have demonstrated the Smart Cruise Control system using real UAV videos where roads need to be tracked and buildings need to be monitored.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-09-28
The Garden State Cleaners Company is a dry cleaning establishment located in Buena Borough, New Jersey. Contaminated wastewater from on-site operations was routinely discharged to on-site soils. Analytical data has described significant soil and ground-water contamination from tetrachloroethylene (PCE) and other volatile organic compounds. Ground-water contamination downgradient (to the south) of the site has required the recommended closing of private wells and the installation of a municipal water supply system. An Administrative Order and Notice of Civil Administrative Penalty Assessment (AO and PSO) were issued to Garden State Cleaners in December 1985, requiring GSC to perform a full RI/FS. Municipalmore » water supplies have been made available to affected residens, but utilization is elective. The site was included on the NPL list in March 1989 and is currently ranked 105 of 108 sites in New Jersey. ATSDR and NJDOH consider the Garden State Cleaners site to be of public health concern. The site is being considered for follow-up health study or evaluation.« less
Moon, Hye-Sung
2018-06-01
Using the da Vinci single-site platform, surgeons can perform more minimally invasive surgery. However, surgical challenges exist due to the limitations of single-site instrumental movements. To aid in the performance of successful robotic single-site hysterectomy, a new suturing technique using the current set of limited instruments is introduced in this study. New vaginal cuff suturing techniques have been used in 55 robotic single-site hysterectomies in our institute over the past 2 years. A needle driver approach utilizing screwing and advancing the needle driver in the correct direction at an increasing angle from the transverse cuff margin with dragging and formation of an adequate loop of thread was used when suturing the vaginal cuff. Using the new vaginal suturing techniques, easy and firm vaginal cuff closure with reduced operative time relative to previous hysterectomies was achieved. The new vaginal cuff suturing techniques may convince more surgeons to perform robotic single-site hysterectomies more frequently and with greater ease. Copyright © 2018. Published by Elsevier B.V.
Tanks Focus Area site needs assessment FY 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by four major US Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), and Savannah River Site (SRS). This document describes the TFA`s process of collecting site needs, analyzing them, and creating technical responses to the sites. It also summarizes the information contained within the TFA needs database, portraying information provided by four majormore » DOE sites with tank waste problems. The overall TFA program objective is to deliver a tank technology program that reduces the current cost, and the operational and safety risks of tank remediation. The TFA`s continues to enjoy close, cooperative relationships with each site. During the past year, the TFA has fostered exchanges of technical information between sites. These exchanges have proven to be healthy for all concerned. The TFA recognizes that site technology needs often change, and the TFA must be prepared not only to amend its program in response, but to help the sites arrive at the best technical approach to solve revised site needs.« less
Analysis of ORNL site temperature and humidity data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willis, B.E.
1989-08-01
The Advanced Neutron Source (ANS) is planned as a new state-of-the-art facility for neutron research and is currently undergoing conceptual design at the Oak Ridge National Laboratory (ORNL). The current concept calls for a nuclear research reactor with an operating power near 350 MW and extensive experiment and user support facilities. Analyses have been undertaken to determine an acceptable design basis wet-bulb temperature range for the facility. Comparisons are drawn with the design wet-bulb temperature previously used for the High Flux Isotope Reactor (HFIR), which is located on an adjacent site a Oak Ridge. This report explains the importance ofmore » wet-bulb temperature to the reactor cooling system performance, and describes the analysis of available meteorological data, and presents the results and the recommendations for a wet-bulb temperature range for use as a part of the plant design basis conditions. 1 ref., 6 figs.« less
NASA Technical Reports Server (NTRS)
Spinhirne, James; Berkoff, Timothy; Welton, Elsworth; Campbell, James; OCStarr, David (Technical Monitor)
2002-01-01
In 1993 the first of the eye safe visible wavelength lidar systems known now as Micro Pulse Lidar (MPL) became operational. Since that time there have been several dozen of these systems produced and applied for full time profiling of atmospheric cloud and aerosol structure. There is currently an observational network of MPL sites to support global climate research. In the course of application of these instruments there have been significant improvements in understanding, design and performance of the systems. There are addition potential and applications beyond current practice for the high repetition rate, eye safe designs. The MPL network and the current capability, design and future potential of MPL systems are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2009-07-14
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for April 1 - June 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and are not included in the aggregate average with the fixed sites. The AMF statistics for this reporting period were not available at the time of this report. The third quarter comprises a total of 2,184 hours for the fixed sites. The average well exceeded our goal this quarter.« less
Size Matters: Penis Size and Sexual Position in Gay Porn Profiles.
Brennan, Joseph
2018-01-01
This article combines qualitative and quantitative textual approaches to the representation of penis size and sexual position of performers in 10 of the most visited gay pornography Web sites currently in operation. Specifically, in excess of 6,900 performer profiles sourced from 10 commercial Web sites are analyzed. Textual analysis of the profile descriptions is combined with a quantitative representation of disclosed penis size and sexual position, which is presented visually by two figures. The figures confirm that these sites generally market themselves as featuring penises that are extraordinarily large and find a sample-wide correlation between smaller penis sizes (5-6.5 inches) and receptive sexual acts (bottoming), and larger (8.5-13 inches) with penetrative acts (topping). These observations are supported through the qualitative textual readings of how the performers are described on these popular sites, revealing the narratives and marketing strategies that shape the construction of popular porn brands, performers, and profitable fantasies.
Design of the aerosol sampling manifold for the Southern Great Plains site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leifer, R.; Knuth, R.H.; Guggenheim, S.F.
1995-04-01
To meet the needs of the ARM program, the Environmental Measurements Laboratory (EML) has the responsibility to establish a surface aerosol measurements program at the Southern Great Plains (SGP) site in Lamont, OK. At the present time, EML has scheduled installation of five instruments at SGP: a single wavelength nephelometer, an optical particle counter (OPC), a condensation particle counter (CPC), an optical absorption monitor (OAM), and an ozone monitor. ARM`s operating protocol requires that all the observational data be placed online and sent to the main computer facility in real time. EML currently maintains a computer file containing back trajectorymore » (BT) analyses for the SGP site. These trajectories are used to characterize air mass types as they pass over the site. EML is continuing to calculate and store the resulting trajectory analyses for future use by the ARM science team.« less
Designing Hydrologic Observatories as a Community Resource
NASA Astrophysics Data System (ADS)
Hooper, R. P.; Duncan, J. M.
2004-12-01
CUAHSI convened a workshop in August 2004 to explore what makes a successful hydrologic observatory. Because of their high cost, only a small number of observatories will be operated, at least initially. (CUAHSI has recommended a pilot network of 5 observatories to develop operational experience and an eventual network of approximately 15 sites.) Because hydrologic scientists can work "in their backyard" (unlike oceanographers or astronomers), hydrologic observatories must offer significant advantages over current methods of field work to successfully attract researchers. Twenty-four teams of scientists submitted "prospectuses" of potential locations for hydrologic observatories for consideration by network attendees. These documents (available at http://www.cuahsi.org) were marketing documents to the workshop participants, who voted for a hypothetical network of 5 observatories from the 24 proposed sites. This network formed the basis for a day of discussions on necessary attributes of core data and how to form a network of observatories from a collection of sites that are designed and implemented individually. Key findings included: 1) Core data must be balanced among disciplines. Although the hydrologic cycle is an organizing principle for the design of HOs, physical data cannot dominate the core data; chemical and biological data, although more expensive to collect, must be given equal footing. 2) New data collection must strategically leverage existing data. Resources are always limited, so that a successful HO must carefully target gaps in existing data, as determined by an explicitly stated conceptual model, and fill them rather than designing an independent study. 3) Site logistics must support remote researchers. Significant resources will be necessary for on-site staff to handle housing, transportation, permitting and other needs. 4) Network-level hypotheses are required early in the implementation of HOs. A network will only emerge around hypotheses. Network-level hypotheses are currently being solicited by CUAHSI to help inform proposing team of important community questions.
Tan, Teck L.; Wang, Lin -Lin; Zhang, Jia; ...
2015-03-02
For small Pt nanoparticles (NPs), catalytic activity is, as observed, adversely affected by size in the 1–3 nm range. We elucidate, via first-principles-based thermodynamics, the operation H* distribution and cyclic voltammetry (CV) during the hydrogen evolution reaction (HER) across the electrochemical potential, including the underpotential region (U ≤ 0) that is difficult to assess in experiment. We consider multiple adsorption sites on a 1 nm Pt NP model and show that the characteristic CV peaks from different H* species correspond well to experiment. We next quantify the activity contribution from each H* species to explain the adverse effect of size.more » From the resolved CV peaks at the standard hydrogen electrode potential (U = 0), we first deduce that the active species for the HER are the partially covered (100)-facet bridge sites and the (111)-facet hollow sites. Upon evaluation of the reaction barriers at operation H* distribution and microkinetic modeling of the exchange current, we find that the nearest-neighbor (100)-facet bridge site pairs have the lowest activation energy and contribute to ~75% of the NP activity. Edge bridge sites (fully covered by H*) per se are not active; however, they react with neighboring (100)-facet H* to account for ~18% of the activity, whereas (111)-facet hollow sites contribute little. As a result, extrapolating the relative contributions to larger NPs in which the ratio of facet-to-edge sites increases, we show that the adverse size effect of Pt NP HER activity kicks in for sizes below 2 nm.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L.
The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), formerly operated a grain storage facility approximately 1,100 ft north of Centralia from 1949 until 1971. Subsequently, a concrete mixing plant operated on the site (FSA 1997). None of the CCC/USDA structures remain, though belowgrade foundations related to structures associated with the concrete mixing operations are evident. Two additional grain storage facilities currently exist in and near Centralia: the Nemaha County Co-op, approximately 4,000 ft south of the former CCC/USDA facility, and a private grain storage facility near the Don Morris residence, 3,500 ft north ofmore » the former CCC/USDA facility (Figure 1.1). The property on which the former facility was located is currently owned by Jeanne Burdett Lacky of Seneca, Kansas. In August-September 1998 the Kansas Department of Health and Environment (KDHE) conducted preliminary investigations at the former CCC/USDA facility, on the basis of the detection of carbon tetrachloride in the domestic well at the Don Morris residence (north of the former CCC/USDA facility). Prior to 1986, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the grain storage industry to preserve grain. The details of previous investigations in the area and a summary of the findings were reported previously (Argonne 2002a). Because the KDHE detected carbon tetrachloride in groundwater and soil at the former CCC/USDA facility at Centralia that might be related to historical use of carbon tetrachloride-based grain fumigants at the facility, the CCC/USDA is conducting an environmental site investigation to determine the source(s) and extent of the carbon tetrachloride contamination at the former facility near Centralia and to assess whether the contamination requires remedial action. The town of Centralia and all residents near the former CCC/USDA facility currently obtain their water from Rural Water District No.3. Therefore, local residents are not drinking or using the contaminated groundwater detected at the former facility. The Environmental Research Division of Argonne National Laboratory is performing the investigation at Centralia on behalf of the CCC/USDA. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. At these former facilities, Argonne is applying its QuickSite{reg_sign} environmental site characterization methodology. QuickSite is Argonne's proprietary implementation system for the expedited site characterization process. This methodology has been applied successfully at a number of former CCC/USDA facilities in Nebraska and Kansas and has been adopted by the American Society for Testing and Materials (ASTM 1998) as standard practice for environmental site characterization. Argonne's investigations are conducted with a phased approach. Phase I focuses primarily on the investigation and evaluation of geology, hydrogeology, and hydrogeochemistry to identify potential contaminant pathways at a site. Phase II focuses on delineating the contamination present in both soil and aquifers along the potential migration pathways. Phase I of Argonne's investigation was conducted in March-April 2002. The results and findings of the Phase I investigation at Centralia were reported previously (Argonne 2003). This report documents the findings of the Phase II activities at Centralia. Section 1 provides a brief history of the area, a review of the Phase I results and conclusions, technical objectives for the Phase II investigation, and a brief description of the sections contained in this report. Section 2 describes the investigative methods used during the Phase II investigation. Section 3 presents all of the data obtained during the investigation. Section 4 describes the interpretation of the pertinent data used to meet the technical objectives of the investigation. Section 5 presents the conclusions of the investigation relative to the technical objectives and outlines further recommendations.« less
Chaikind, Brian; Bessen, Jeffrey L.; Thompson, David B.; Hu, Johnny H.; Liu, David R.
2016-01-01
We describe the development of ‘recCas9’, an RNA-programmed small serine recombinase that functions in mammalian cells. We fused a catalytically inactive dCas9 to the catalytic domain of Gin recombinase using an optimized fusion architecture. The resulting recCas9 system recombines DNA sites containing a minimal recombinase core site flanked by guide RNA-specified sequences. We show that these recombinases can operate on DNA sites in mammalian cells identical to genomic loci naturally found in the human genome in a manner that is dependent on the guide RNA sequences. DNA sequencing reveals that recCas9 catalyzes guide RNA-dependent recombination in human cells with an efficiency as high as 32% on plasmid substrates. Finally, we demonstrate that recCas9 expressed in human cells can catalyze in situ deletion between two genomic sites. Because recCas9 directly catalyzes recombination, it generates virtually no detectable indels or other stochastic DNA modification products. This work represents a step toward programmable, scarless genome editing in unmodified cells that is independent of endogenous cellular machinery or cell state. Current and future generations of recCas9 may facilitate targeted agricultural breeding, or the study and treatment of human genetic diseases. PMID:27515511
NASA Technical Reports Server (NTRS)
1977-01-01
The wastewater treatment facilities of three communities in southern Florida and two in southern Texas areas having populations of 20,000 or fewer persons were surveyed to determine: (1) their performance characteristics and the nature of their customers; (2) facility upgrading requirements needed to meet current and future EPA and State standards; (3) their adaptability to water hyacinth utilization and harvested plant disposal; and (4) the level of community support. Guidelines for site selection were established and applied to five cities in Texas and four in Florida. An evaluation of the prospective sites reveals that the Florida locations are generally unsuitable for implementation of water hyacinth based systems because of regulatory philosophy. All five Texas sites have excellent potential.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The purpose of an EPA Record of Decision is to evaluate a Superfund Site with the goal of protecting human health and the environment while ensuring consistency of evaluations in contamination and clean-up of all Superfund sites. The ROD is a public document signed by the appropriate Regional Administrator which details cleanup, cost estimates, and EPA`s responsiveness to the public comment summary. The ROD may be litigated, thus it is important to have all current updates to the signed EPA decision. The ROD may be amended with an Amendment or supplemented by an Explanation of Significant Difference (ESD). A Superfundmore » Site may have multiple RODs, as each Superfund Site may be further redefined as Operable Units and Events. This allows EPA`s decisions to evolve as new technology presents itself. Average clean-up time for a Superfund Site can range from 12 to 100 years.« less
Radiation Exposure and Vascular Access in Acute Coronary Syndromes: The RAD-Matrix Trial.
Sciahbasi, Alessandro; Frigoli, Enrico; Sarandrea, Alessandro; Rothenbühler, Martina; Calabrò, Paolo; Lupi, Alessandro; Tomassini, Francesco; Cortese, Bernardo; Rigattieri, Stefano; Cerrato, Enrico; Zavalloni, Dennis; Zingarelli, Antonio; Calabria, Paolo; Rubartelli, Paolo; Sardella, Gennaro; Tebaldi, Matteo; Windecker, Stephan; Jüni, Peter; Heg, Dik; Valgimigli, Marco
2017-05-23
It remains unclear whether radial access increases the risk of operator or patient radiation exposure compared to transfemoral access when performed by expert operators. This study sought to determine whether radial access increases radiation exposure. A total of 8,404 patients, with or without ST-segment elevation acute coronary syndrome, were randomly assigned to radial or femoral access for coronary angiography and percutaneous intervention, and collected fluoroscopy time and dose-area product (DAP). RAD-MATRIX is a radiation sub-study of the MATRIX (Minimizing Adverse Haemorrhagic Events by Transradial Access Site and Systemic Implementation of AngioX) trial. We anticipated that 13 or more operators, each wearing a thorax (primary endpoint), wrist, and head (secondary endpoints) lithium fluoride thermoluminescent dosimeter, and randomizing at least 13 patients per access site, were needed to establish noninferiority of radial versus femoral access. Among 18 operators, performing 777 procedures in 767 patients, the noninferiority primary endpoint was not achieved (p value for noninferiority = 0.843). Operator equivalent dose at the thorax (77 μSv) was significantly higher with radial than femoral access (41 μSv; p = 0.02). After normalization of operator radiation dose by fluoroscopy time or DAP, the difference remained significant. Radiation dose at wrist or head did not differ between radial and femoral access. Thorax operator dose did not differ for right radial (84 μSv) compared to left radial access (52 μSv; p = 0.15). In the overall MATRIX population, fluoroscopy time and DAP were higher with radial compared to femoral access: 10 min versus 9 min (p < 0.0001) and 65 Gy·cm 2 versus 59 Gy·cm 2 (p = 0.0001), respectively. Compared to femoral access, radial access is associated with greater operator and patient radiation exposure when performed by expert operators in current practice. Radial operators and institutions should be sensitized towards radiation risks and adopt adjunctive radioprotective measures. (Minimizing Adverse Haemorrhagic Events by Transradial Access Site and Systemic Implementation of AngioX; NCT101433627). Copyright © 2017 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.
McFarland, Forrest S.; Lienkaemper, James J.; Caskey, S. John
2009-01-01
From 1979 until his retirement from the project in 2001, Jon Galehouse of San Francisco State University (SFSU) and many student research assistants measured creep (aseismic slip) rates on these faults. The creep measurement project, which was initiated by Galehouse, continued through the Geosciences Department at SFSU from 2001-2006 under the direction of Karen Grove and John Caskey (Grove and Caskey, 2005) and since 2006 under Caskey (2007). Forrest McFarland has managed most of the technical and logistical project operations, as well as data processing and compilation since 2001. Data from 2001-2007 are found in McFarland and others (2007). From 2009 onward, we have released the raw data annually using this report (OF2009-1119) as a permanent publication link, while publishing more detailed analyses of these data in the scientific literature, such as Lienkaemper and others (2014a). We maintain a project Web site (http://funnel.sfsu.edu/creep/) that includes the following information: project description, project personnel, creep characteristics and measurement, map of creep-measurement sites, creep-measurement site information, and links to data plots for each measurement site. Our most current, annually updated results are, therefore, accessible to the scientific community and to the general public. Information about the project can currently be requested by the public by an email link (fltcreep@sfsu.edu) found on our project Web site.
3D mapping of buried rocks by the GPR WISDOM/ExoMars 2020
NASA Astrophysics Data System (ADS)
Herve, Yann; Ciarletti, Valerie; Le Gall, Alice; Quantin, Cathy; Guiffaut, Christophe; Plettemeier, Dirk
2017-04-01
The main objective of ExoMars 2020 is to search for signs of past and/or present life on Mars. Because these signs may be beneath the inhospitable surface of Mars, the ExoMars Rover has on board a suite of instruments aiming at characterizing the subsurface. In particular, the Rover payload includes WISDOM (Water Ice Subsurface Deposits Observation on Mars), a polarimetric ground penetrating radar designed to investigate the shallow subsurface. WISDOM is able to probe down to a depth of few meters with a resolution of few centimeters; its main objective is to provide insights into the geological context of the investigated Martian sites and to determine the most promising location to collect samples for the ExoMars drill. In this paper, we demonstrate the ability of WISDOM to locate buried rocks and to estimate their size distribution. Indeed, the rock distribution is related to the geological processes at play in the past or currently and thus provides clues to understand the geological context of the investigated site. Rocks also represent a hazard for drilling operations that WISDOM is to guide. We use a 3D FDTD code called TEMSI-FD (which takes into account the radiation pattern of the antenna system) to simulate WISDOM operations on a realistic (both in terms of dielectric properties and structure) ground. More specifically, our geoelectrical models of the Martian subsurface take into account realistic values of the complex permittivity relying on published measurements performed in laboratory on Martian analogues. Further, different distributions of buried rocks are considered based on the size-frequency distribution observed at the Mars Pathfinder landing site and on Oxia Planum, the landing site currently selected for ExoMars 2020. We will describe the algorithm we developed to automatically detect the signature of the buried rocks on radargrams. The radargrams are obtained simulating WISDOM operations along parallel and perpendicular profiles as planned for the ExoMars mission. Our ultimate goal is to show that WISDOM observations can be used to build a 3D map of the subsurface. We will also present experimental data obtained with a prototype of WISDOM to test our method.
Philippines TCCON Project: Installation, Operation, and Comparisons with GOSAT and OCO-2 Data
NASA Astrophysics Data System (ADS)
Morino, I.; Velazco, V. A.; Hori, A.; Uchino, O.; Sakai, T.; Izumi, T.; Nagai, T.; Bagtasa, G.; Yoshida, Y.; Kiel, M.; Bukosa, B.; Deutscher, N. M.; Fisher, J. A.; Griffith, D. W. T.
2017-12-01
TCCON is dedicated to the precise measurements of greenhouse gases (GHGs) such as CO2 and CH4. TCCON measurements have been and are currently used extensively and globally for satellite validation, for comparison with atmospheric chemistry models and to study atmosphere-biosphere exchanges of carbon. With the global effort to cap GHG emissions, TCCON has taken on a vital role in validating satellite-based GHG data from past, current and future missions like Japanese GOSAT and GOSAT-2, NASA's OCO-2 and OCO-3, Chinese TanSat, TROPOMI, and others. The lack of reliable validation data for the satellite-based GHG observing missions in the tropical regions is a common limitation in global carbon-cycle modeling studies that have a tropical component. The international CO2 modeling community has specified a requirement for "expansion of the CO2 observation network within the tropics" to reduce uncertainties in regional estimates of CO2sources and sinks using atmospheric transport models. To address this challenge, we installed a newly-constructed TCCON FTS at a wind farm operated by the Energy Development Corporation in Burgos, Ilocos Norte, Philippines (18.5326° N, 120.6496° E), which followed rigorous site assessments and discussions at several TCCON and GOSAT-2 science team meetings. After developing the TCCON instrument and characterizing its performance at the NIES in Japan, we deployed the TCCON FTS at the Burgos site in Dec. 2016. Installation and set up of the instruments were concluded in Mar. 2017, followed by first measurements of solar absorption spectra and continued operations in the Philippines using TCCON protocols. Here, we will show obvious CO2, CH4and CO enhancements were observed in Mar. 2017, accompanied by clear depolarization signals from a LIDAR instrument. These enhancements are probably caused by outflow of pollution from major cities in China but the emissions are underestimated in the GEOS-Chem model. Comparisons with GOSAT and OCO-2 soundings will also be shown. The Burgos site has been approved as an official TCCON site with a provisional status at the last TCCON meeting in Jun. 2017.
NASA's Next Generation Space Geodesy Network
NASA Technical Reports Server (NTRS)
Desai, S. D.; Gross, R. S.; Hilliard, L.; Lemoine, F. G.; Long, J. L.; Ma, C.; McGarry, J. F.; Merkowitz, S. M.; Murphy, D.; Noll, C. E.;
2012-01-01
NASA's Space Geodesy Project (SGP) is developing a prototype core site for a next generation Space Geodetic Network (SGN). Each of the sites in this planned network co-locate current state-of-the-art stations from all four space geodetic observing systems, GNSS, SLR, VLBI, and DORIS, with the goal of achieving modern requirements for the International Terrestrial Reference Frame (ITRF). In particular, the driving ITRF requirements for this network are 1.0 mm in accuracy and 0.1 mm/yr in stability, a factor of 10-20 beyond current capabilities. Development of the prototype core site, located at NASA's Geophysical and Astronomical Observatory at the Goddard Space Flight Center, started in 2011 and will be completed by the end of 2013. In January 2012, two operational GNSS stations, GODS and GOON, were established at the prototype site within 100 m of each other. Both stations are being proposed for inclusion into the IGS network. In addition, work is underway for the inclusion of next generation SLR and VLBI stations along with a modern DORIS station. An automated survey system is being developed to measure inter-technique vectorties, and network design studies are being performed to define the appropriate number and distribution of these next generation space geodetic core sites that are required to achieve the driving ITRF requirements. We present the status of this prototype next generation space geodetic core site, results from the analysis of data from the established geodetic stations, and results from the ongoing network design studies.
Cost-effectiveness of the Federal stream-gaging program in Virginia
Carpenter, D.H.
1985-01-01
Data uses and funding sources were identified for the 77 continuous stream gages currently being operated in Virginia by the U.S. Geological Survey with a budget of $446,000. Two stream gages were identified as not being used sufficiently to warrant continuing their operation. Operation of these stations should be considered for discontinuation. Data collected at two other stations were identified as having uses primarily related to short-term studies; these stations should also be considered for discontinuation at the end of the data collection phases of the studies. The remaining 73 stations should be kept in the program for the foreseeable future. The current policy for operation of the 77-station program requires a budget of $446,000/yr. The average standard error of estimation of streamflow records is 10.1%. It was shown that this overall level of accuracy at the 77 sites could be maintained with a budget of $430,500 if resources were redistributed among the gages. A minimum budget of $428,500 is required to operate the 77-gage program; a smaller budget would not permit proper service and maintenance of the gages and recorders. At the minimum budget, with optimized operation, the average standard error would be 10.4%. The maximum budget analyzed was $650,000, which resulted in an average standard error of 5.5%. The study indicates that a major component of error is caused by lost or missing data. If perfect equipment were available, the standard error for the current program and budget could be reduced to 7.6%. This also can be interpreted to mean that the streamflow data have a standard error of this magnitude during times when the equipment is operating properly. (Author 's abstract)
Patterns and operative treatment of recurrent Crohn's disease: a prospective longitudinal study.
Fichera, Alessandro; Lovadina, Stefano; Rubin, Michele; Cimino, Fabrizio; Hurst, Roger D; Michelassi, Fabrizio
2006-10-01
It is believed commonly that Crohn's recurrences always occur at the site of a previous intestinal anastomosis; yet this concept is probably inaccurate and not mindful of the panintestinal nature of the disease. Between October, 1984 and March, 2003, we carried out 1,132 procedures (464 for primary and 668 for recurrent disease) on 981 consecutive patients. Patients in whom we carried out both the original procedure as well as the procedure for recurrent disease constitute this study population. Operative procedures for perineal complications were excluded from this analysis. Data were accrued prospectively. Seventy-eight patients met the study inclusion criteria. They had a total of 149 sites of disease (duodenum, n = 3; jejunum/ileum, n = 53; terminal ileum/neo terminal ileum, n = 67; colon and rectum, n = 26). One hundred thirty-four sites required operative intervention (85 resections and 49 strictureplasties) and 15 did not. Crohn's disease recurred in 79 sites after a mean of 48.4 months (range, 1-161 months, median, 41 months). Site of operative intervention and operative technique influenced patterns of recurrence: when an anastomosis or strictureplasty was constructed with small bowel, the majority of recurrences were limited to the anastomotic line (17/29, 59%); when it was constructed with small bowel and colon, the majority of recurrences extended to the proximal limb (29/35, 83%). The difference in recurrence pattern is significant (P < .01). In addition, fewer recurrences occurred at strictureplasty than resection sites (22/49, 45%, vs 57/85, 70%, respectively, P < .05). At the time of the second procedure, 40 additional recurrences were identified distant from the original operative site. Four of these represented progression of disease at the 15 sites that did not originally need operative intervention. Of 119 total recurrences, 115 required 73 resections, 40 strictureplasties, and 2 other procedures. The site of the original operative intervention is the most common site for recurrence, although as many as one-third of recurrences occur separate from it. Pattern of recurrence is influenced by site of the operative intervention (anastomotic for small bowel, proximal limb for ileocolonic) and by operative technique (fewer recurrences occurred at strictureplasty than resection sites). Disease progression occurred in 25% of the sites not addressed operatively at the original procedure. The operative strategy applied to Crohn's complications in different intestinal sites was similar for primary and recurrent disease.
Current status of SPINNORs designs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Su'ud, Zaki
2010-06-22
This study discuss about the SPINNOR (Small Power Reactor, Indonesia, No On-site Refuelling) and the VSPINNOR (Very Small Power Reactor, Indonesia, No On-site Refuelling) which are small lead-bismuth cooled nuclear power reactors with fast neutron spectrum that could be operated for more than 10 or 15 years without on-site refuelling. They are based on the concept of a long-life core reactor developed in Indonesia since early 1990 in collaboration with the Research Laboratory for Nuclear Reactors of the Tokyo Institute of Technology (RLNR TITech). The reactor cores are designed to have near zero (less then one effective delayed neutron fraction)more » burn-up reactivity swing during the whole course of their operation to avoid a possibility of prompt criticality accident. The basic concept is that central region of the reactor core is filled with fertile (blanket) material. During the reactor operation fissile material accumulates in this central region, which helps to compensate fissile material loss in the peripheral core region and also contributes to negative coolant loss reactivity effect. A concept of high fuel volume fraction in the core is applied to achieve smaller size of a critical reactor. In this paper we consider to add Np-237 to the fuel to enhance non proliferation characteristics of the systems. The effect of Np-237 amount variation is discussed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2008-05-22
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period April 1, 2007 - March 31, 2008. Table 2 shows the summary of cumulative users for the period April 1, 2007 - March 31, 2007. For the second quarter of FY 2008, the overall number of users was nearly as high as the last reporting period, in which a new record high for number of users was established. This quarter, a new record high was established for the number of user days, particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany, as well as major field campaigns at the NSA and SGP sites. This quarter, 37% of the Archive users are ARM science-funded principal investigators and 23% of all other facility users are either ARM science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period January 1 - March 31, 2008. There were no incidents this reporting period.« less
Runtime optimization of an application executing on a parallel computer
None
2014-11-25
Identifying a collective operation within an application executing on a parallel computer; identifying a call site of the collective operation; determining whether the collective operation is root-based; if the collective operation is not root-based: establishing a tuning session and executing the collective operation in the tuning session; if the collective operation is root-based, determining whether all compute nodes executing the application identified the collective operation at the same call site; if all compute nodes identified the collective operation at the same call site, establishing a tuning session and executing the collective operation in the tuning session; and if all compute nodes executing the application did not identify the collective operation at the same call site, executing the collective operation without establishing a tuning session.
Runtime optimization of an application executing on a parallel computer
Faraj, Daniel A; Smith, Brian E
2014-11-18
Identifying a collective operation within an application executing on a parallel computer; identifying a call site of the collective operation; determining whether the collective operation is root-based; if the collective operation is not root-based: establishing a tuning session and executing the collective operation in the tuning session; if the collective operation is root-based, determining whether all compute nodes executing the application identified the collective operation at the same call site; if all compute nodes identified the collective operation at the same call site, establishing a tuning session and executing the collective operation in the tuning session; and if all compute nodes executing the application did not identify the collective operation at the same call site, executing the collective operation without establishing a tuning session.
Runtime optimization of an application executing on a parallel computer
Faraj, Daniel A.; Smith, Brian E.
2013-01-29
Identifying a collective operation within an application executing on a parallel computer; identifying a call site of the collective operation; determining whether the collective operation is root-based; if the collective operation is not root-based: establishing a tuning session and executing the collective operation in the tuning session; if the collective operation is root-based, determining whether all compute nodes executing the application identified the collective operation at the same call site; if all compute nodes identified the collective operation at the same call site, establishing a tuning session and executing the collective operation in the tuning session; and if all compute nodes executing the application did not identify the collective operation at the same call site, executing the collective operation without establishing a tuning session.
Drew, Michael K; Lovell, Gregory; Palsson, Thorvaldur S; Chiarelli, Pauline E; Osmotherly, Peter G
2016-10-01
This is the first study to evaluate the mechanical sensitivity, clinical classifications and prevalence of groin pain in Australian football players. Case-control. Professional (n=66) and semi-professional (n=9) Australian football players with and without current or previous groin injuries were recruited. Diagnoses were mapped to the Doha Agreement taxonomy. Point and career prevalence of groin pain was calculated. Pressure pain thresholds (PPTs) were assessed at regional and distant sites using handheld pressure algometry across four sites bilaterally (adductor longus tendon, pubic bone, rectus femoris, tibialis anterior muscle). To assess the relationship between current groin pain and fixed effects of hyperalgesia of each site and a history of groin pain, a mixed-effect logistic regression model was utilised. Receiver Operator Characteristic (ROC) curve were determined for the model. Point prevalence of groin pain in the preseason was 21.9% with a career prevalence of 44.8%. Adductor-related groin pain was the most prevalent classification in the pre-season period. Hyperalgesia was observed in the adductor longus tendon site in athletes with current groin pain (OR=16.27, 95% CI 1.86 to 142.02). The ROC area under the curve of the regression model was fair (AUC=0.76, 95% CI 0.54 to 0.83). Prevalence data indicates that groin pain is a larger issue than published incidence rates imply. Adductor-related groin pain is the most common diagnosis in pre-season in this population. This study has shown that hyperalgesia exists in Australian football players experiencing groin pain indicating the value of assessing mechanical pain sensitivity as a component of the clinical assessment. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Yim, S.-W.; Yu, S.-D.; Kim, H.-R.; Kim, M.-J.; Park, C.-R.; Yang, S.-E.; Kim, W.-S.; Hyun, O.-B.; Sim, J.; Park, K.-B.; Oh, I.-S.
2010-11-01
We have constructed and completed the preparation for a long-term operation test of a superconducting fault current limiter (SFCL) in a Korea Electric Power Corporation (KEPCO) test grid. The SFCL with rating of 22.9 kV/630 A, 3-phases, has been connected to the 22.9 kV test grid equipped with reclosers and other protection devices in Gochang Power Testing Center of KEPCO. The main goals of the test are the verification of SFCL performance and protection coordination studies. A line-commutation type SFCL was fabricated and installed for this project, and the superconducting components were cooled by a cryo-cooler to 77 K in the sub-cooled liquid nitrogen pressurized by 3 bar of helium gas. The verification test includes un-manned - long-term operation with and without loads and fault tests. Since the test site is 170 km away from the laboratory, we will adopt the un-manned operation with real-time remote monitoring and controlling using high speed internet. For the fault tests, we will apply fault currents up to around 8 kArms to the SFCL using an artificial fault generator. The fault tests may allow us not only to confirm the current limiting capability of the SFCL, but also to adjust the SFCL - recloser coordination such as resetting over-current relay parameters. This paper describes the construction of the testing facilities and discusses the plans for the verification tests.
Charles Essien; Qingzheng Cheng; Brian K. Via; Edward F. Loewenstein; Xiping Wang
2016-01-01
There is currently a request from landowners in southeastern USA to provide a non-destructive tool that can differentiate the quality between stands of 25 and 30 years of age subjected to different thinning treatments. A typical site with various thinning regimes was used to vary the wood quality and to determine whether acoustics had the ability to seperate for...
1985-07-01
proposed range . 54 Table 4.4. HUD site acceptability standards ... ........... .. 55 Table 4.5. Predicted pollutant emissions for flight activties...Current flight operations from Moody contribute particulatmatter, carbon monoxide, hydrocarbons, oxides of nitrogen, and oxides of sulfur to the...regional pollution levels, but because of the amounts emitted and the altitudes at which they typically occur, these emissions have only minor impact on
D. J. Leduc; J. C. G. Goelz
2010-01-01
The hazard of southern pine beetle (SPB) infestations is affected by characteristics such as stand density, stand age, site quality, and tree size. COMPUTE P-LOB is a model that simulates the growth and development of loblolly pine plantations in the west gulf coastal plain. P-LOB was rewritten as COMPUTE SPB-Lob to update it for current operating systems and to...
2006-09-01
Astin, Director (December, 1965) [2] Agranovich, Y. Ya. “The theory of operators with dominant main diagonal. I.” Positiv - ity, Volume 2 (1998) pages 153...A Spherical Harmonics Solu- tion for Radiative Transfer Problems with Reflecting Boundaries and Internal Sources” Journal of Quantitative Spectroscopy...F. Huxley. “A Quantitative Description of Membrane Current and its Application to Conduction and Excitation in Nerve” Journal of Physiology (1952
NASA Technical Reports Server (NTRS)
Feigenbaum, H.; Kaufman, A.; Wang, C. L.; Werth, J.; Whelan, J. A.
1983-01-01
Operating experience with a 5kW methanol-air integrated system is described. On-going test results for a 24-cell, two-sq ft (4kW) stack are reported. The main activity for this stack is currently the evaluation of developmental non-metalic cooling plates. Single-cell test results are presented for a promising developmental cathode catalyst.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tynan, Mark C.; Russell, Glenn P.; Perry, Frank V.
These associated tables, references, notes, and report present a synthesis of some notable geotechnical and engineering information used to create four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies or disposal facilities 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding “deep underground” facilities, history, activities, and plans. In general, the interactive maps and database provide each facility’s approximate site location, geology, and engineered features (e.g.:more » access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not comprehensive, it is representative of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.« less
Mars Reconnaissance Orbiter In-flight Anomalies and Lessons Learned: An Update
NASA Technical Reports Server (NTRS)
Bayer, Todd J.
2008-01-01
The Mars Reconnaissance Orbiter mission has as its primary objectives: advance our understanding of the current Mars climate, the processes that have formed and modified the surface of the planet and the extent to which water has played a role in surface processes; identify sites of possible aqueous activity indicating environments that may have been or are conducive to biological activity; and thus identify and characterize sites for future landed missions; and provide forward and return relay services for current and future Mars landed assets. MRO's crucial role in the long term strategy for Mars exploration requires a high level of reliability during its 5.4 year mission. This requires an architecture which incorporates extensive redundancy and cross-strapping. Because of the distances and hence light-times involved, the spacecraft itself must be able to utilize this redundancy in responding to time-critical failures. For cases where fault protection is unable to recognize a potentially threatening condition, either due to known limitations or software flaws, intervention by ground operations is required. These aspects of MRO's design were discussed in a previous paper [Ref. 1]. This paper provides an update to the original paper, describing MRO's significant in-flight anomalies over the past year, with lessons learned for redundancy and fault protection architectures and for ground operations.
Current situation and future plans in radioactive waste management in Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lopez, H.; Jimenez, M.
1992-01-01
A brief introduction is offered in this document in order to explain the importance which is given in Mexico to the safe management of radioactive wastes. The Secretaria de Energia, Minas e Industria Paraestatal is the organization responsible for this issue. Also, a brief historical background is offered so as to understand the evolution of these activities since they were originated. This background allows us to describe the present situation, which consists in a substantial change in the volume of produced radioactive wastes; in other words, before the present situation only the, nuclear wastes from the application of radioisotopes weremore » generated whereas currently, with the starting of commercial operation of the first unit of Laguna Verde Nuclear Power Plant (LVNPP), large volumes of industrial radioactive wastes are being generated. A mention is given as well of the acquired experience during more than 20 years of waste management and of the technologies which have been applied or practiced in the use and disposal of such wastes. Finally, some general trends in relation to the future planning are indicated, which essentially consist in the siting and characterization of a site so as to, design and construct a permanent disposal facility in order to dispose the operational radioactive wastes from LVNPP.« less
Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)
DOE Office of Scientific and Technical Information (OSTI.GOV)
COVEY, L.I.
2000-11-28
The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will havemore » been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.« less
36 CFR 6.5 - Solid waste disposal sites in operation on September 1, 1984.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Solid waste disposal sites in..., DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.5 Solid waste disposal sites in operation on September 1, 1984. (a) The operator of a solid waste disposal site in...
36 CFR 6.5 - Solid waste disposal sites in operation on September 1, 1984.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Solid waste disposal sites in..., DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.5 Solid waste disposal sites in operation on September 1, 1984. (a) The operator of a solid waste disposal site in...
36 CFR 6.5 - Solid waste disposal sites in operation on September 1, 1984.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Solid waste disposal sites in..., DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.5 Solid waste disposal sites in operation on September 1, 1984. (a) The operator of a solid waste disposal site in...
36 CFR 6.5 - Solid waste disposal sites in operation on September 1, 1984.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Solid waste disposal sites in..., DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.5 Solid waste disposal sites in operation on September 1, 1984. (a) The operator of a solid waste disposal site in...
36 CFR 6.5 - Solid waste disposal sites in operation on September 1, 1984.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Solid waste disposal sites in..., DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.5 Solid waste disposal sites in operation on September 1, 1984. (a) The operator of a solid waste disposal site in...
Results from Three Years of Ka-Band Propagation Characterization at Svalbard, Norway
NASA Technical Reports Server (NTRS)
Nessel, James; Zemba, Michael; Morse, Jacquelynne
2015-01-01
Over the next several years, NASA plans to launch several earth science missions which are expected to achieve data throughputs of 5-40 terabits per day transmitted from low earth orbiting spacecraft to ground stations. The current S-band and X-band frequency allocations in use by NASA, however, are incapable of supporting the data rates required to meet this demand. As such, NASA is in the planning stages to upgrade its existing Near Earth Network (NEN) polar ground stations to support Ka-band (25.5-27 GHz) operations. Consequently, it installed and operated a Ka-band radiometer at the Svalbard site. Svalbard was chosen as the appropriate site for two primary reasons: (1) Svalbard will be the first site to be upgraded to Ka-band operations within the NEN Polar Network enhancement plan, and (2) there exists a complete lack of Ka-band propagation data at this site (as opposed to the Fairbanks, AK NEN site, which has 5 years of characterization collected during the Advanced Communications Technology becomes imperative that characterization of propagation effects at these NEN sites is conducted to determine expected system Satellite (ACTS) campaign). processing and provide the Herein, we discuss the data three-year measurement results performance, particularly at low elevation angles ((is) less than 10 deg) from the ongoing Ka-band propagation characterization where spacecraft signal acquisition typically occurs. Since May 2011, NASA Glenn Research Center has installed and operated a Ka-band radiometer at the NEN site located in Svalbard, Norway. The Ka-band radiometer monitors the water vapor line, as well as 4 frequencies around 26.5 GHz at a fixed 10 deg elevation angle. Three-year data collection results indicate good campaign at Svalbard, Norway. Comparison of these results with the ITU models and existing ERA profile data indicates very good agreement when the 2010 rain maps and cloud statistics are used. Finally, the Svalbard data is used to derive the expected atmospheric margin requirements for this site agreement with models and comparable performance to necessary to maintain total system availability levels for the previously characterized northern latitude sites in the United States, i.e., Fairbanks, Alaska. The Svalbard data is used to upcoming Joint Polar Satellite System (JPSS) launch in the derive availability results for an upcoming earth-observation 2017/2022 timeframes. mission, JPSS-1, and indicate a requirement of 4 dB of atmospheric attenuation margin necessary to close the link with 99% overall system availability for the expected LEO orbital cycle, as observed from the Svalbard location.
Results from Three Years of Ka-band Propagation Characterization at Svalbard, Norway
NASA Technical Reports Server (NTRS)
Nessel, James A.; Zemba, Michael; Morse, Jacquelynne
2015-01-01
Over the next several years, NASA plans to launch several earth science missions which are expected to achieve data throughputs of 5-40 terabits per day transmitted from low earth orbiting spacecraft to ground stations. The current S-band and X-band frequency allocations in use by NASA, however, are incapable of supporting the data rates required to meet this demand. As such, NASA is in the planning stages to upgrade its existing Near Earth Network (NEN) polar ground stations to support Ka-band (25.5-27 GHz) operations. Consequently, it installed and operated a Ka-band radiometer at the Svalbard site. Svalbard was chosen as the appropriate site for two primary reasons: (1) Svalbard will be the first site to be upgraded to Ka-band operations within the NEN Polar Network enhancement plan, and (2) there exists a complete lack of Ka-band propagation data at this site (as opposed to the Fairbanks, AK NEN site, which has 5 years of characterization collected during the Advanced Communications Technology becomes imperative that characterization of propagation effects at these NEN sites is conducted to determine expected system Satellite (ACTS) campaign). processing and provide the Herein, we discuss the data three-year measurement results performance, particularly at low elevation angles ((is) less than 10 deg) from the ongoing Ka-band propagation characterization where spacecraft signal acquisition typically occurs. Since May 2011, NASA Glenn Research Center has installed and operated a Ka-band radiometer at the NEN site located in Svalbard, Norway. The Ka-band radiometer monitors the water vapor line, as well as 4 frequencies around 26.5 GHz at a fixed 10 deg elevation angle. Three-year data collection results indicate good campaign at Svalbard, Norway. Comparison of these results with the ITU models and existing ERA profile data indicates very good agreement when the 2010 rain maps and cloud statistics are used. Finally, the Svalbard data is used to derive the expected atmospheric margin requirements for this site agreement with models and comparable performance to necessary to maintain total system availability levels for the previously characterized northern latitude sites in the United States, i.e., Fairbanks, Alaska. The Svalbard data is used to upcoming Joint Polar Satellite System (JPSS) launch in the derive availability results for an upcoming earth-observation 2017/2022 timeframes. mission, JPSS-1, and indicate a requirement of 4 dB of atmospheric attenuation margin necessary to close the link with 99% overall system availability for the expected LEO orbital cycle, as observed from the Svalbard location.
Human Mars Landing Site and Impacts on Mars Surface Operations
NASA Technical Reports Server (NTRS)
Bussey, Ben; Hoffman, Stephen J.
2016-01-01
This paper describes NASA's initial steps for identifying and evaluating candidate Exploration Zones (EZs) and Regions of Interests (ROIs) for the first human crews that will explore the surface of Mars. NASA's current effort to define the exploration of this planet by human crews, known as the Evolvable Mars Campaign (EMC), provides the context in which these EZs and ROIs are being considered. The EMC spans all aspects of a human Mars mission including launch from Earth, transit to and from Mars, and operations on the surface of Mars. Studies related to Mars surface operations and related system capabilities have led to the current definition of an EZ as well as ROIs. An EZ is a collection of ROIs that are located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains one or more landing sites and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. With the EMC as a conceptual basis, the EZ model has been refined to a point where specific site selection criteria for scientific exploration and in situ resource utilization can be defined. In 2015 these criteria were distributed to the planetary sciences community and the in situ resource utilization and civil engineering communities as part of a call for EZ proposals. The resulting "First Landing Site/Exploration Zone Workshop for Human Missions to the Surface of Mars" was held in October 2015 during which 47 proposals for EZs and ROIs were presented and discussed. Proposed locations spanned all longitudes and all allowable latitudes (+/- 50 degrees). Proposed justification for selecting one of these EZs also spanned a significant portion of the scientific and resource criteria provided to the community. Workshop results will be used to prepare for follow-on workshops to refine our understanding of proposed EZs and ultimately select a single location to be explored and utilized by human crews. Another significant workshop outcome was a recognition that new data will be needed to refine our understanding of the value of proposed EZs. These new data will come in part from existing spacecraft at Mars and may come from future robotic Mars missions as appropriate consideration is given to these new data needs during mission definition and development.
10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs
Code of Federal Regulations, 2010 CFR
2010-01-01
... average megawatts or more over a 12 month period. This applies to power marketing operations and to siting... Systems D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities D3. Siting/construction/operation/decommissioning of uranium enrichment facilities D4. Siting/construction...
Hanf, R William; Kelly, Lynn M
2005-03-01
Drinking water is supplied to most U.S. Department of Energy (DOE) facilities on the Hanford Site by DOE-owned, contractor-operated pumping and distribution systems. Water is primarily obtained from the Columbia River, but some facilities use water from on-site groundwater wells. Because of the large amount of radioactive and chemical waste produced, stored, and disposed of at Hanford, some people are concerned that waste materials are contaminating on-site drinking-water supplies. This paper describes the drinking-water facilities and treatment requirements on the Hanford Site and summarizes radiological and non-radiological water quality data obtained from water samples collected from each drinking-water system in use during 2001 and 2002. Monitoring data show that Hanford-produced radionuclides are measurable in some drinking-water samples. The only non-radiological contaminants detected either were by-products of the chlorination process or came from off-site agricultural activities. Contaminant level values were, in all cases, below state and federal drinking-water limits. This information will provide assurance to current employees and future site developers that drinking water on the Hanford Site is safe for public consumption.
Beam-dynamics driven design of the LHeC energy-recovery linac
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pellegrini, Dario; Latina, Andrea; Schulte, Daniel
The LHeC study is a possible upgrade of the LHC that aims at delivering an electron beam for collisions with the existing hadronic beams. The current baseline design for the electron facility consists of a multi-pass superconducting energy-recovery linac operating in a continuous wave mode. Here, we summarize the overall layout of such ERL complex located on the LHC site and introduce the most recent developments. We review of the lattice components, presenting their baseline design along with possible alternatives that aims at improving the overall machine performance. The detector bypass has been designed and integrated into the lattice. Trackingmore » simulations allowed us to verify the high current (~150 mA in the linacs) beam operation required for the LHeC to serve as an Higgs Factory. The impact of single and multi-bunch wake-fields, synchrotron radiation and beam-beam effects has been assessed in this paper.« less
Beam-dynamics driven design of the LHeC energy-recovery linac
Pellegrini, Dario; Latina, Andrea; Schulte, Daniel; ...
2015-12-23
The LHeC study is a possible upgrade of the LHC that aims at delivering an electron beam for collisions with the existing hadronic beams. The current baseline design for the electron facility consists of a multi-pass superconducting energy-recovery linac operating in a continuous wave mode. Here, we summarize the overall layout of such ERL complex located on the LHC site and introduce the most recent developments. We review of the lattice components, presenting their baseline design along with possible alternatives that aims at improving the overall machine performance. The detector bypass has been designed and integrated into the lattice. Trackingmore » simulations allowed us to verify the high current (~150 mA in the linacs) beam operation required for the LHeC to serve as an Higgs Factory. The impact of single and multi-bunch wake-fields, synchrotron radiation and beam-beam effects has been assessed in this paper.« less
Reese, Ronald S.; Alvarez-Zarikian, Carlos A.
2007-01-01
Well construction, hydraulic well test, ambient water-quality, and cycle test data were inventoried and compiled for 30 aquifer storage and recovery facilities constructed in the Floridan aquifer system in southern Florida. Most of the facilities are operated by local municipalities or counties in coastal areas, but five sites are currently being evaluated as part of the Comprehensive Everglades Restoration Plan. The relative performance of all sites with adequate cycle test data was determined, and compared with four hydrogeologic and design factors that may affect recovery efficiency. Testing or operational cycles include recharge, storage, and recovery periods that each last days or months. Cycle test data calculations were made including the potable water (chloride concentration of less than 250 milligrams per liter) recovery efficiency per cycle, total recovery efficiency per cycle, and cumulative potable water recovery efficiencies for all of the cycles at each site. The potable water recovery efficiency is the percentage of the total amount of potable water recharged for each cycle that is recovered; potable water recovery efficiency calculations (per cycle and cumulative) were the primary measures used to evaluate site performance in this study. Total recovery efficiency, which is the percent recovery at the end of each cycle, however, can be substantially higher and is the performance measure normally used in the operation of water-treatment plants. The Upper Floridan aquifer of the Floridan aquifer system currently is being used, or planned for use, at 29 of the aquifer storage and recovery sites. The Upper Floridan aquifer is continuous throughout southern Florida, and its overlying confinement is generally good; however, the aquifer contains brackish to saline ground water that can greatly affect freshwater storage and recovery due to dispersive mixing within the aquifer. The hydrogeology of the Upper Floridan varies in southern Florida; confinement between flow zones is better in southwestern Florida than in southeastern Florida. Vertical hydraulic conductivity in the upper part of the aquifer also may be higher in southeastern Florida because of unconformities present at formation contacts within the aquifer that may be better developed in this area. Recovery efficiencies per cycle varied widely. Eight sites had recovery efficiencies of less than about 10 percent for the first cycle, and three of these sites had not yet achieved recoveries exceeding 10 percent, even after three to five cycles. The highest recovery efficiency achieved per cycle was 94 percent. Three southeastern coastal sites and two southwestern coastal sites have achieved potable water recoveries per cycle exceeding 60 percent. One of the southeastern coastal sites and both of the southwestern coastal sites achieved good recoveries, even with long storage periods (from 174 to 191 days). The high recovery efficiencies for some cycles apparently resulted from water banking?an operational approach whereby an initial cycle with a large recharge volume of water is followed by cycles with much smaller recharge volume. This practice flushes out the aquifer around the well and builds up a buffer zone that can maintain high recovery efficiency in the subsequent cycles. The relative performance of all sites with adequate cycle test data was determined. Performance was arbitrarily grouped into ?high? (greater than 40 percent), ?medium? (between 20 and 40 percent), and ?low? (less than 20 percent) categories based primarily on their cumulative recovery efficiency for the first seven cycles, or projected to seven cycles if fewer cycles were conducted. The ratings of three sites, considered to be borderline, were modified using the overall recharge rate derived from the cumulative recharge volumes. A higher overall recharge rate (greater than 300 million gallons per year) can improve recovery efficiency because of the water-bankin
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. M. Capron
2008-04-15
The 100-F-50 waste site, part of the 100-FR-2 Operable Unit, is a steel stormwater runoff culvert that runs between two railroad grades in the south-central portion of the 100-F Area. The culvert exiting the west side of the railroad grade is mostly encased in concrete and surrounded by a concrete stormwater collection depression partially filled with soil and vegetation. The drain pipe exiting the east side of the railroad grade embankment is partially filled with soil and rocks. The 100-F-50 stormwater diversion culvert confirmatory sampling results support a reclassification of this site to no action. The current site conditions achievemore » the remedial action objectives and corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less
Taking a traditional web site to patient portal technology.
Labow, Kimberly
2010-01-01
In this era of consumer-driven healthcare, consumers (your current and potential patients) seek healthcare information on the Internet. If your practice doesn't have a Web site, or has one that's static and uninformative, you won't be found, and the patient will move on to the next practice Web site. Why? Because only the most graphically appealing, informative, and patient-centered Web sites will drive patients to your practice. Patients are demanding improved communication with their physician. A practice Web site is a start, but the adoption of a fully functional, interactive Web site with patient portal solutions will not only improve patient-to-provider relationships but will also give the patient access to your practice from anywhere, at any time of the day. Furthermore, these solutions can help practices increase efficiencies and revenue, while reducing operating costs. With the American Recovery and Reinvestment Act of 2009 and other incentives for healthcare information technology adoption, the time is right for your practice to consider implementing technology that will bring considerable value to your practice and also increase patient satisfaction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Texarkana Wood Preserving Company (TWPC) is a National Priorities List site located in northeastern Texas, at the southern extremity of the City of Texarkana in Bowie County. The TWPC site has been used for various lumber-related activities since the early 1900s and for creosoting operations since the early 1950s. Contaminated soils, groundwater, surface water, and surface water sediments have been detected on and off of the TWPC site. The primary contaminants of concern are polycyclic aromatic hydrocarbons, pentachlorophenol, chlorinated dibenzodioxins and chlorinated dibenzofurans. The population at greatest risk of exposure to these contaminants are on-site workers engaged in remedialmore » activities. There are currently no residences or businesses located immediately adjacent to the site and no documentation that contaminated groundwater is being used for potable purposes. The Texarkana Wood Preserving Company site has been evaluated by the Agency for Toxic Substances and Disease Registry (ATSDR) Health Activities Recommendation Panel (HARP) for appropriate follow-up with respect to health activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contaminationmore » and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.« less
Silva, Gisele S; Farrell, Shawn; Shandra, Emma; Viswanathan, Anand; Schwamm, Lee H
2012-08-01
Little is known about adoption or success of telestroke networks outside of published or federally funded programs. Under contract to the Health Resource Services Administration, we conducted an environmental scan of telestroke programs in the United States. An analyst contacted all potential programs identified in comprehensive online searches, interviewed respondents, and collected response data about structural and functional components of currently operating telestroke programs. Among 97 potential programs contacted, 56 programs had confirmed telestroke activity, and 38 programs (68%) from 27 states participated. Hospital and community characteristics of nonparticipating programs were similar to those of participating ones. The top 3 clinical needs met by the telestroke were emergency department consultation (100%), patient triage (83.8%), and inpatient teleconsultation (46.0%). Telestroke programs were in operation a median of 2.44 years (interquartile range, 1.36-3.44 years); 94.6% used 2-way, real-time interactive video plus imaging, but only 44% used dedicated telemedicine consultation software. The mean number of spokes per hub increased significantly from 2007 to 2008 to 2009 (3.78 versus 7.60; P<0.05), and >80% of spoke sites were rural or small hospitals. Reimbursement was absent for >40% of sites. Sites rated inability to obtain physician licensure (27.77%), lack of program funds (27.77%), and lack of reimbursement (19.44%) as the most important barriers to program growth. Telestroke is a widespread and growing practice model. Important barriers to expansion amenable to change relate to organizational, technical, and educational domains and external economic and regulatory forces.
Advanced Atmospheric Modeling for Emergency Response.
NASA Astrophysics Data System (ADS)
Fast, Jerome D.; O'Steen, B. Lance; Addis, Robert P.
1995-03-01
Atmospheric transport and diffusion models are an important part of emergency response systems for industrial facilities that have the potential to release significant quantities of toxic or radioactive material into the atmosphere. An advanced atmospheric transport and diffusion modeling system for emergency response and environmental applications, based upon a three-dimensional mesoscale model, has been developed for the U.S. Department of Energy's Savannah River Site so that complex, time-dependent flow fields not explicitly measured can be routinely simulated. To overcome some of the current computational demands of mesoscale models, two operational procedures for the advanced atmospheric transport and diffusion modeling system are described including 1) a semiprognostic calculation to produce high-resolution wind fields for local pollutant transport in the vicinity of the Savannah River Site and 2) a fully prognostic calculation to produce a regional wind field encompassing the southeastern United States for larger-scale pollutant problems. Local and regional observations and large-scale model output are used by the mesoscale model for the initial conditions, lateral boundary conditions, and four-dimensional data assimilation procedure. This paper describes the current status of the modeling system and presents two case studies demonstrating the capabilities of both modes of operation. While the results from the case studies shown in this paper are preliminary and certainly not definitive, they do suggest that the mesoscale model has the potential for improving the prognostic capabilities of atmospheric modeling for emergency response at the Savannah River Site. Long-term model evaluation will be required to determine under what conditions significant forecast errors exist.
NASA Program of Airborne Optical Observations.
Bader, M; Wagoner, C B
1970-02-01
NASA's Ames Research Center currently operates a Convair 990 four-engine jet transport as a National Facility for airborne scientific research (astronomy, aurora, airglow, meteorology, earth resources). This aircraft can carry about twelve experiments to 12 km for several hours. A second aircraft, a twin-engine Lear Jet, has been used on a limited basis for airborne science and can carry one experiment to 15 km for 1 h. Mobility and altitude are the principal advantages over ground sites, while large payload and personnel carrying capabilities, combined with ease of operations and relatively low cost, are the main advantages compared to balloons, rockets, or satellites. Typical airborne instrumentation and scientific results are presented.
A science and technology initiative within the office of civilian radioactive waste management
Budnitz, R.J.; Kiess, T.E.; Peters, M.; Duncan, D.
2003-01-01
In 2002, by following a national decision-making process that had been specified in the 1982 Nuclear Waste Policy Act, Yucca Mountain (YM) was designated as the site for the nation's geologic repository for commercial spent nuclear fuel (SNF). The U.S. Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) must now obtain regulatory approval to construct and operate a repository there, and to develop transportation and infrastructure needed to support operations. The OCRWM has also recently begun a separate Science and Technology (S&T) initiative, whose purposes, beginnings, current projects, and future plans are described here.
Cost-effectiveness of the stream-gaging program in Maryland, Delaware, and the District of Columbia
Carpenter, David H.; James, R.W.; Gillen, D.F.
1987-01-01
This report documents the results of a cost-effectiveness study of the stream-gaging program in Maryland, Delaware, and the District of Columbia. Data uses and funding sources were identified for 99 continuously operated stream gages in Maryland , Delaware, and the District of Columbia. The current operation of the program requires a budget of $465,260/year. The average standard error of estimation of streamflow records is 11.8%. It is shown that this overall level of accuracy at the 99 sites could be maintained with a budget of $461,000, if resources were redistributed among the gages. (USGS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bracey, William; Bondre, Jayant; Shelton, Catherine
2013-07-01
The current inventory of used nuclear fuel assemblies (UNFAs) from commercial reactor operations in the United States totals approximately 65,000 metric tons or approximately 232,000 UNFAs primarily stored at the 104 operational reactors in the US and a small number of decommissioned reactors. This inventory is growing at a rate of roughly 2,000 to 2,400 metric tons each year, (Approx. 7,000 UNFAs) as a result of ongoing commercial reactor operations. Assuming an average of 10 metric tons per storage/transportation casks, this inventory of commercial UNFAs represents about 6,500 casks with an additional of about 220 casks every year. In Januarymore » 2010, the Blue Ribbon Commission (BRC) [1] was directed to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new plan. The BRC issued their final recommendations in January 2012. One of the main recommendations is for the United States to proceed promptly to develop one or more consolidated storage facilities (CSF) as part of an integrated, comprehensive plan for safely managing the back end of the nuclear fuel cycle. Based on its extensive experience in storage and transportation cask design, analysis, licensing, fabrication, and operations including transportation logistics, Transnuclear, Inc. (TN), an AREVA Subsidiary within the Logistics Business Unit, is engineering an integrated system that will address the complete process of commercial UNFA management. The system will deal with UNFAs in their current storage mode in various configurations, the preparation including handling and additional packaging where required and transportation of UNFAs to a CSF site, and subsequent storage, operation and maintenance at the CSF with eventual transportation to a future repository or recycling site. It is essential to proceed by steps to ensure that the system will be the most efficient and serve at best its purpose by defining: the problem to be resolved, the criteria to evaluate the solutions, and the alternative solutions. The complexity of the project is increasing with time (more fuel assemblies, new storage systems, deteriorating logistics infrastructure at some sites, etc.) but with the uncertainty on the final disposal path, flexibility and simplicity will be critical. (authors)« less
An Analog Rover Exploration Mission for Education and Outreach
NASA Astrophysics Data System (ADS)
Moores, John; Campbell, Charissa L.; Smith, Christina L.; Cooper, Brittney A.
2017-10-01
This abstract describes an analog rover exploration mission designed as an outreach program for high school and undergraduate students. This program is used to teach them about basic mission control operations, how to manage a rover as if it were on another planetary body, and employing the rover remotely to complete mission objectives. One iteration of this program has been completed and another is underway. In both trials, participants were shown the different operation processes involved in a real-life mission. Modifications were made to these processes to decrease complexity and better simulate a mission control environment in a short time period (three 20-minute-long mission “days”). In the first run of the program, participants selected a landing site, what instruments would be on the rover - subject to cost, size, and weight limitations - and were randomly assigned one of six different mission operations roles, each with specific responsibilities. For example, a Science Planner/Integrator (SPI) would plan science activities whilst a Rover Engineer (RE) would keep on top of rover constraints. Planning consisted of a series of four meetings to develop and verify the current plan, pre-plan the next day's activities and uplink the activities to the “rover” (a human colleague). Participants were required to attend certain meetings depending upon their assigned role. To conclude the mission, students viewed the site to understand any differences between remote viewing and reality in relation to the rover. Another mission is currently in progress with revisions from the earlier run to improve the experience. This includes broader roles and meetings and pre-selecting the landing site and rover. The new roles are: Mission Lead, Rover Engineer and Science Planner. The SPI role was previously popular so most of the students were placed in this category. The meetings were reduced to three but extended in length. We are also planning to integrate this program into the Ontario Science Center (OSC) to educate and fascinate people of all ages.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jean-Philippe Nicot; Renaud Bouroullec; Hugo Castellanos
2006-06-30
Underground carbon storage may become one of the solutions to address global warming. However, to have an impact, carbon storage must be done at a much larger scale than current CO{sub 2} injection operations for enhanced oil recovery. It must also include injection into saline aquifers. An important characteristic of CO{sub 2} is its strong buoyancy--storage must be guaranteed to be sufficiently permanent to satisfy the very reason that CO{sub 2} is injected. This long-term aspect (hundreds to thousands of years) is not currently captured in legislation, even if the U.S. has a relatively well-developed regulatory framework to handle carbonmore » storage, especially in the operational short term. This report proposes a hierarchical approach to permitting in which the State/Federal Government is responsible for developing regional assessments, ranking potential sites (''General Permit'') and lessening the applicant's burden if the general area of the chosen site has been ranked more favorably. The general permit would involve determining in the regional sense structural (closed structures), stratigraphic (heterogeneity), and petrophysical (flow parameters such as residual saturation) controls on the long-term fate of geologically sequestered CO{sub 2}. The state-sponsored regional studies and the subsequent local study performed by the applicant will address the long-term risk of the particular site. It is felt that a performance-based approach rather than a prescriptive approach is the most appropriate framework in which to address public concerns. However, operational issues for each well (equivalent to the current underground injection control-UIC-program) could follow regulations currently in place. Area ranking will include an understanding of trapping modes. Capillary (due to residual saturation) and structural (due to local geological configuration) trappings are two of the four mechanisms (the other two are solubility and mineral trappings), which are the most relevant to the time scale of interest. The most likely pathways for leakage, if any, are wells and faults. We favor a defense-in-depth approach, in which storage permanence does not rely upon a primary seal only but assumes that any leak can be contained by geologic processes before impacting mineral resources, fresh ground water, or ground surface. We examined the Texas Gulf Coast as an example of an attractive target for carbon storage. Stacked sand-shale layers provide large potential storage volumes and defense-in-depth leakage protection. In the Texas Gulf Coast, the best way to achieve this goal is to establish the primary injection level below the total depth of most wells (>2,400 m-8,000 ft). In addition, most faults, particularly growth faults, present at the primary injection level do not reach the surface. A potential methodology, which includes an integrated approach comprising the whole chain of potential events from leakage from the primary site to atmospheric impacts, is also presented. It could be followed by the State/Federal Government, as well as by the operators.« less
Terrestrial reference standard sites for postlaunch sensor calibration
Teillet, P.M.; Chander, G.
2010-01-01
In an era when the number of Earth observation satellites is rapidly growing and measurements from satellite sensors are used to address increasingly urgent global issues, often through synergistic and operational combinations of data from multiple sources, it is imperative that scientists and decision-makers are able to rely on the accuracy of Earth observation data products. The characterization and calibration of these sensors, particularly their relative biases, are vital to the success of the developing integrated Global Earth Observation System of Systems (GEOSS) for coordinated and sustained observations of the Earth. This can only reliably be achieved in the postlaunch environment through the careful use of observations by multiple sensor systems over common, well-characterized terrestrial targets (i.e., on or near the Earth's surface). Through greater access to and understanding of these vital reference standard sites and their use, the validity and utility of information gained from Earth remote sensing will continue to improve. This paper provides a brief overview of the use of reference standard sites for postlaunch sensor radiometric calibration from historical, current, and future perspectives. Emphasis is placed on optical sensors operating in the visible, near-infrared, and shortwave infrared spectral regions.
Ultra-portable field transfer radiometer for vicarious calibration of earth imaging sensors
NASA Astrophysics Data System (ADS)
Thome, Kurtis; Wenny, Brian; Anderson, Nikolaus; McCorkel, Joel; Czapla-Myers, Jeffrey; Biggar, Stuart
2018-06-01
A small portable transfer radiometer has been developed as part of an effort to ensure the quality of upwelling radiance from test sites used for vicarious calibration in the solar reflective. The test sites are used to predict top-of-atmosphere reflectance relying on ground-based measurements of the atmosphere and surface. The portable transfer radiometer is designed for one-person operation for on-site field calibration of instrumentation used to determine ground-leaving radiance. The current work describes the detector- and source-based radiometric calibration of the transfer radiometer highlighting the expected accuracy and SI-traceability. The results indicate differences between the detector-based and source-based results greater than the combined uncertainties of the approaches. Results from recent field deployments of the transfer radiometer using a solar radiation based calibration agree with the source-based laboratory calibration within the combined uncertainties of the methods. The detector-based results show a significant difference to the solar-based calibration. The source-based calibration is used as the basis for a radiance-based calibration of the Landsat-8 Operational Land Imager that agrees with the OLI calibration to within the uncertainties of the methods.
(abstract) A Mobile Robot for Remote Response to Incidents Involving Hazardous Materials
NASA Technical Reports Server (NTRS)
Welch, Richard V.
1994-01-01
This paper will report the status of the Emergency Response Robotics project, a teleoperated mobile robot system being developed at JPL for use by the JPL Fire Department/HAZMAT Team. The project, which began in 1991, has been focused on developing a robotic vehicle which can be quickly deployed by HAZMAT Team personnel for first entry into an incident site. The primary goals of the system are to gain access to the site, locate and identify the hazard, and aid in its mitigation. The involvement of JPL Fire Department/HAZMAT Team personnel has been critical in guiding the design and evaluation of the system. A unique feature of the current robot, called HAZBOT III, is its special design for operation in combustible environments. This includes the use of all solid state electronics, brushless motors, and internal pressurization. Demonstration and testing of the system with HAZMAT Team personnel has shown that teleoperated robots, such as HAZBOT III, can successfully gain access to incident sites locating and identifying hazardous material spills. Work is continuing to enable more complex missions through the addition of appropriate sensor technology and enhancement of the operator interface.
Karouna-Renier, Natalie K; Rao, K Ranga; Lanza, John J; Davis, Deeya A; Wilson, Patricia A
2007-10-01
The Escambia Wood Treating Company (ETC) Superfund site, Pensacola, FL, is contaminated with polychlorinated dibenzo-p-dioxins and polychlorinated dibenzofurans (PCDD/F), benzo(a)pyrene, lead and arsenic from pentachlorophenol (PCP), creosote, and other compounds used to treat utility poles and foundation pilings. Although ETC's operations ceased in 1982, soils in the areas surrounding the facility continue to exhibit elevated levels of contaminants attributable to ETC operations. In July 2000, individuals who may have been affected by contamination from the ETC site, including current and former residents and former workers and their household members were invited to participate in a study, which included a health and exposure history and routine blood analysis. We also conducted a toxicological health evaluation of a subset of these eligible workers/residents by analyzing serum levels of 17 PCDD/F congeners. Members of the ETC cohort exhibited elevated serum PCDD/F relative to the general population, and congener profiles in members of the cohort reflected patterns commonly observed in persons exposed to PCP. Hypertension prevalence in the cohort was found to correlate with PCDD/F levels, although no other significant relationships were identified with monitored health indices.
Shah, Sachin D.; Quigley, Sean M.
2005-01-01
Air Force Plant 4 (AFP4) and adjacent Naval Air Station-Joint Reserve Base (NAS-JRB) at Fort Worth, Tex., constitute a government-owned, contractor-operated (GOCO) facility that has been in operation since 1942. Contaminants from the facility, primarily volatile organic compounds (VOCs) and metals, have entered the groundwater-flow system through leakage from waste-disposal sites (landfills and pits) and from manufacturing processes (U.S. Air Force, Aeronautical Systems Center, 1995). The U.S. Geological Survey (USGS), in cooperation with the U.S. Air Force (USAF), Aeronautical Systems Center, Environmental Management Directorate (ASC/ENVR), developed a comprehensive database (or geodatabase) of temporal and spatial environmental information associated with the geology, hydrology, and water quality at AFP4 and NAS-JRB. The database of this report provides information about the AFP4 and NAS-JRB study area including sample location names, identification numbers, locations, historical dates, and various measured hydrologic data. This database does not include every sample location at the site, but is limited to an aggregation of selected digital and hardcopy data of the USAF, USGS, and various consultants who have previously or are currently working at the site.
Site Operators License: Guidelines for Applicants
DOT National Transportation Integrated Search
1995-08-08
The U. S. Department of Transportation's Office of Commercial Space : Transportation (OCST) issues site operator licenses based on the site : operator's demonstration of the ability to ensure public safety and the : safety of property, both on and of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... if I own or operate an existing stationary RICE with a site rating of equal to or less than 500 brake....6602 What emission limitations must I meet if I own or operate an existing stationary RICE with a site... operate an existing stationary RICE with a site rating of equal to or less than 500 brake HP located at a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Dave; Miller, David; Kautsky, Mark
A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoingmore » activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.« less
EMP Attachment 3 DOE-SC PNNL Site Dose Assessment Guidance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Snyder, Sandra F.
2011-12-21
This Dose Assessment Guidance (DAG) describes methods to use to determine the Maximally-Exposed Individual (MEI) location and to estimate dose impact to that individual under the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from PNNL Site operations. This document is an attachment to the Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP) and describes dose assessment guidance for radiological air emissions. The impact of radiological air emissions from the U.S. Department of Energy Office ofmore » Science (DOE-SC) PNNL Site is indicated by dose estimates to a maximally exposed member of the public, referred to as the maximally exposed individual (MEI). Reporting requirements associated with dose to members of the public from radiological air emissions are in 40 CFR Part 61.94, WAC 246-247-080, and DOE Order 458.1. The DOE Order and state standards for dose from radioactive air emissions are consistent with U.S. Environmental Protection Agency (EPA) dose standards in 40 CFR 61.92 (i.e., 10 mrem/yr to a MEI). Despite the fact that the current Contract Requirements Document (CRD) for the DOE-SC PNNL Site operations does not include the requirement to meet DOE CRD 458.1, paragraph 2.b, public dose limits, the DOE dose limits would be met when EPA limits are met.« less
Desert Research and Technology Studies (RATS) Local and Remote Test Sites
NASA Technical Reports Server (NTRS)
Janoiko, Barbara; Kosmo, Joseph; Eppler, Dean
2007-01-01
Desert RATS (Research and Technology Studies) is a combined group of inter-NASA center scientists and engineers, collaborating with representatives of industry and academia, for the purpose of conducting remote field exercises. These exercises provide the capability to validate experimental hardware and software, to evaluate and develop mission operational techniques, and to identify and establish technical requirements applicable for future planetary exploration. D-RATS completed its ninth year of field testing in September 2006. Dry run test activities prior to testing at designated remote field site locations are initially conducted at the Johnson Space Center (JSC) Remote Field Demonstration Test Site. This is a multi-acre external test site located at JSC and has detailed representative terrain features simulating both Lunar and Mars surface characteristics. The majority of the remote field tests have been subsequently conducted in various high desert areas adjacent to Flagstaff, Arizona. Both the local JSC and remote field test sites have terrain conditions that are representative of both the Moon and Mars, such as strewn rock and volcanic ash fields, meteorite crater ejecta blankets, rolling plains, hills, gullies, slopes, and outcrops. Flagstaff is the preferred remote test site location for many reasons. First, there are nine potential test sites with representative terrain features within a 75-mile radius. Second, Flagstaff is the location of the United States Geologic Survey (USGS)/Astrogeology Branch, which historically supported Apollo astronaut geologic training and currently supports and provides host accommodations to the D-RATS team. Finally, in considering the importance of logistics in regard to providing the necessary level of support capabilities, the Flagstaff area provides substantial logistics support and lodging accommodations to take care of team members during long hours of field operations.
NASA Astrophysics Data System (ADS)
Naftz, D. L.; Walton-Day, K. E.; Fuller, C.; Dam, W. L.; Briggs, M. A.; Snyder, T.
2015-12-01
Legacy uranium (U) mining and processing activities have resulted in soil and water contamination on Federal, state, and tribal lands in the western United States. Sites include legacy mill sites associated with U extraction now managed by the Department of Energy and thousands of waste dumps associated with U exploration, mining, and processing. Recently (2012), over 400,000 hectares of federally managed land in northern Arizona was withdrawn from consideration of mining for a 20-year period to protect the Grand Canyon watershed from potentially adverse effects of U mineral exploration and development. Ore from active and recently active U mines in the Colorado Plateau, the Henry Mountains Complex, and the Arizona Strip is transported to the only currently (2015) active conventional mill site in the western United States, located in Utah. Previous and ongoing U.S. Geological Survey assessments to examine U mobility at a variety of legacy and active sites associated with ore exploration, extraction, and processing will be presented as field-scale examples. Topics associated with site investigations will include: (1) offsite migration of radionuclides associated with the operation of the White Mesa U mill; (2) long-term contaminant transport from legacy U waste dumps on Bureau of Land Management regulated land in Utah; (3) application of incremental soil sampling techniques to determine pre- and post-mining radionuclide levels associated with planned and operating U mines in northern Arizona; (4) application of fiber optic digital temperature sensing equipment to identify areas where shallow groundwater containing elevated U levels may be discharging to a river adjacent to a reclaimed mill site in central Wyoming; and (5) field-scale manipulation of groundwater chemistry to limit U migration from a legacy upgrader site in southeastern Utah.
Development of the INEEL Site Wide Vadose Zone Roadmap
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yonk, Alan Keith
2001-09-01
The INEEL Vadose Zone Roadmap was developed to identify inadquacies in current knowledge, to assist in contaminant management capabilities relative to the INEEL vadose zone, and to ensure that ongoing and planned Science and Technology developments will meet the risk management challenges facing the INEEL in coming years. The primary objective of the Roadmap is to determine the S&T needs that will facilitate monitoring, characterization, prediction, and assessment activities necessary to support INEEL risk management decisions and to ensure that long-term stewardship of contaminated sites at the INEEL is achieved. The mission of the Roadmap is to insure that themore » long-term S&T strategy is aligned with site programs, that it takes advantage of progress made to date, and that it can assist in meeting the milestones and budgets of operations.« less
Phase I and II feasibility study report for the 300-FF-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1993-12-31
The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phasemore » III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.« less
Robotic single port cholecystectomy: current data and future perspectives.
Angelou, Anastasios; Skarmoutsos, Athanasios; Margonis, Georgios A; Moris, Demetrios; Tsigris, Christos; Pikoulis, Emmanouil
2017-04-01
Minimally invasive techniques are used more and more frequently. Since conventional laparoscopic approach has been the gold standard, surgeons in their effort to further reduce the invasiveness of conventional laparoscopic cholecystectomy have adopted Single Incision approach. The widespread adoption of robotics has led to the inevitable hybridization of robotic technology with laparoendoscopic single-site surgery (LESS). As a result, employment of the da Vinci surgical system may allow greater surgical maneuverability, improving ergonomics. A review of the English literature was conducted to evaluate all robotic single port cholecystectomy performed till today. Demographic data, operative parameters, postoperative outcomes and materials used for the operation were collected and assessed. A total of 12 studies, including 501 patients were analyzed. Demographics and clinical characteristics of the patients was heterogeneous, but in most studies a mean BMI <30 was recorded. Intraoperative metrics like operative time, estimated blood loss and conversion rate were comparable with those in multiport conventional laparoscopy. Robotic single port cholecystectomy is a safe and feasible alternative to conventional multiport laparoscopic or manual robotic approach. However, current data do not suggest a superiority of robotic SILC over other established methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. L. Sisterson
2010-01-12
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Booth, Peter M.; Da Silva, Nivaldo Carlos; Pereira de Oliveira, Alexandre
The Caldas site is located in the Federal State of Minas Gerais in Brazil about 25 km from the city of Pocos de Caldas. While the city itself has 150,000 inhabitants there is a total population of around 0.5 million people living in an area that could potentially be influenced by the site. Uranium ore was mined and milled here between the years of 1982 and 1995, with ore extraction taking place from an open pit. Of the material removed, aside from that extracted for uranium, some was used on-site for road construction and building embankments while the remainder wasmore » disposed of onto two major rock piles. There are a number of potential historical and current environmental impacts to groundwater as a consequence of discharges into streams which then flow off site. The site is now undergoing a phase of decommissioning which includes the formulation and substantiation of a site remediation strategy. As part of a wider International Atomic Energy Agency (IAEA) Technical Cooperation Project aimed at providing practical guidance for implementing a decommissioning and remediation plan at the site, WSP E and E were invited to lead a mission in order to provide advice on the importance and merits of stakeholder engagement and how to ultimately build an engagement program. In November 2011, WSP E and E met with personnel from the site operators, the Brazilian regulatory bodies and representatives from the local stakeholder community and explained the principles of stakeholder engagement and how the process had internationally evolved principally from a decide-announce-defend approach to a more formal two way mechanism of engagement. Historically there had been insufficient liaison between the site operator, the nuclear regulator and the environmental regulator. All parties had recognized that greater interaction was necessary. There had also been very little engagement with local stakeholders about the various activities on the site and the potential implications of these activities on human health and the environment. The main concerns of the local stakeholders were in relation to potential environmental impacts on groundwater and surface water as well as their lack of knowledge about the site's activities and how it might evolve over time. There was a feeling that the site brought no real benefit to the local community as local labor was rarely utilized when work was being undertaken. WSP E and E were asked many questions about stakeholder engagement processes and had to address a number of concerns relating to being able to construct and control an engagement program. Advice was provided on how to construct a phased program in a manner that would allow the site operator to demonstrate increased transparency and allow as wide a range of stakeholders as possible the opportunity to become engaged. We provided an important message in that engagement often had to be culture and project specific and that what might work in one country could not necessarily purely be transposed to another. Since the WSP E and E mission there has been evidence of a number of positive steps in many of the areas of stakeholder engagement related to the Caldas site. The nuclear and environmental regulators work in a more open and transparent manner and continue to undertake joint inspections of the Caldas site. They have agreed to develop a written agreement that will enable them to jointly assess and discuss the issues on the site. Both regulatory bodies had previously accompanied the site operator on a visit to the Wismut uranium mining area in Germany and as well as providing useful learning had also allowed the regulators to discuss some common issues, thus bringing them closer together. A local stakeholder group under the auspices of the Water Commission had previously been set up but now they are starting to have more regular meetings with the site operator and nuclear regulator. They are now additionally considering the formation of a site specific advisory board (based on similar lines to those at US legacy sites) in order to gain some further technical focus within the stakeholder community. The site operator has started to present and explain the proposed environmental remediation plans to various towns and cities potentially influenced by the Caldas site. The successes to date can be attributed primarily to the willingness of the site operator to engage more openly with local community representatives in addition to the enthusiasm of the Water Commission itself. Providing stakeholder engagement advice to all the relevant parties in a manner which recognized their concerns, aspirations and country specific culture was extremely important for this positive progress to have been established. The process established and the subsequent successes could provide useful learning to those countries that face similar cultural engagement challenges. (authors)« less
Variation in Treatment of Displaced Geriatric Acetabular Fractures Among 15 Level-I Trauma Centers.
Manson, Theodore T; Reider, Lisa; OʼToole, Robert V; Scharfstein, Daniel O; Tornetta, Paul; Gary, Joshua L
2016-09-01
To document the initial treatment of displaced acetabular fractures among older adults across multiple trauma centers and to investigate the factors that influence the decision to operate and the choice of operative procedure [open reduction internal fixation (ORIF) vs. total hip arthroplasty (THA)]. Retrospective observational study. Fifteen US level-I trauma centers participating in the Major Extremity Trauma Research Consortium. Overall, 269 patients aged 60 years or older admitted for the treatment of a displaced acetabular fracture. None. Treatment. Sixty percent of fractures (n = 162) were treated operatively. Younger age (<80 years), injury from high-energy mechanism, fractures with femoral head impaction, and fractures without hip congruency were significantly associated with receiving operative treatment (P < 0.05). Significant site variation in operative versus nonoperative treatment occurred even after accounting for these factors (P = 0.0044). Among operatively treated patients, 88% (n = 142) received ORIF and 12% (n = 20) received THA as the initial treatment. Women were more likely to be treated with initial THA compared with men; of the known risk factors for poor outcomes with ORIF (ie, dome or roof impaction, femoral head impaction, or posterior wall involvement), only dome impaction was significantly associated with receiving initial THA (P < 0.05). Currently, no treatment guidelines exist for acetabular fractures in older adults, which likely explains the significant site variation in operative versus nonoperative treatment. This study identifies patient and injury factors that drive treatment decisions, which will be important in planning and designing future trials needed to determine the best treatment for these fractures.
Anomalous event diagnosis for environmental satellite systems
NASA Technical Reports Server (NTRS)
Ramsay, Bruce H.
1993-01-01
The National Oceanic and Atmospheric Administration's (NOAA) National Environmental Satellite, Data, and Information Service (NESDIS) is responsible for the operation of the NOAA geostationary and polar orbiting satellites. NESDIS provides a wide array of operational meteorological and oceanographic products and services and operates various computer and communication systems on a 24-hour, seven days per week schedule. The Anomaly Reporting System contains a database of anomalous events regarding the operations of the Geostationary Operational Environmental Satellite (GOES), communication, or computer systems that have degraded or caused the loss of GOES imagery. Data is currently entered manually via an automated query user interface. There are 21 possible symptoms (e.g., No Data), and 73 possible causes (e.g., Sectorizer - World Weather Building) of an anomalous event. The determination of an event's cause(s) is made by the on-duty computer operator, who enters the event in a paper based daily log, and by the analyst entering the data into the reporting system. The determination of the event's cause(s) impacts both the operational status of these systems, and the performance evaluation of the on-site computer and communication operations contractor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2007-07-26
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period April 1 through June 30, 2007, for the fixed sites only. The AMF has been deployed to Germany and is operational this quarter. The third quarter comprises a total of 2,184 hours. Although the average exceeded our goal this quarter, there were cash flow issues resulting from Continuing Resolution early in the period that did not allow for timely instrument repairs that kept our statistics lower than past quarters at all sites. The low NSA numbers resulted from missing MFRSR data this spring that appears to be recoverable but not available at the Archive at the time of this report.« less
Space Station Freedom assembly and operation at a 51.6 degree inclination orbit
NASA Technical Reports Server (NTRS)
Troutman, Patrick A.; Brewer, Laura M.; Heck, Michael L.; Kumar, Renjith R.
1993-01-01
This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.
Real-time Data Access From Remote Observatories
NASA Astrophysics Data System (ADS)
Detrick, D. L.; Lutz, L. F.; Etter, J. E.; Rosenberg, T. J.; Weatherwax, A. T.
2006-12-01
Real-time access to solar-terrestrial data is becoming increasingly important, not only because it is now possible to acquire and access data rapidly via the internet, but also because of the need for timely publication of real-time data for analysis and modeling efforts. Currently, engineering-scaled summary data are available routinely on a daily basis from many observatories, but only when the observatories have continuous, or at least daily network access. Increasingly, the upgrading of remote data acquisition hardware makes it possible to provide data in real-time, and it is becoming normal to expect timely access to data products. The NSF- supported PENGUIn/AGO constellation of autonomous Antarctic research observatories has provided real-time data since December, 2002, when Iridium satellite modems were installed at three sites. The Iridium telecommunications links are maintained continuously, transferring data between the remote observatories and a U.S.-based data acquisition site. The time-limiting factor with this scenario is now the delay in completing a data record before transmission, which can be as short as minutes depending on the sampling rate. The single-channel data throughput of the current systems is 20-MB/day (megabytes per day), but planned installations will be capable of operating with multiple modem channels. The data records are currently posted immediately to a web site accessible by anonymous FTP client software, for use by the instruments' principal investigators, and survey plots of selected signals are published daily. The web publication facilities are being upgraded, in order to allow other interested researchers rapid access to engineering-scaled data products, in several common formats, as well as providing interactive plotting capabilities. The web site will provide access to data from other collaborating observatories (including South Pole and McMurdo Stations), as well as ancillary data accessible from public sites (e.g., Kp, AE, Dst). The site will be accessible via common HTML interface protocols, enabling access to the data products by browsers or other compatible application software. We describe details of the hardware and software components of the Iridium telecommunications linkage, as well as details of the current and planned web publication capabilities.
GAS INJECTION/WELL STIMULATION PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
John K. Godwin
2005-12-01
Driver Production proposes to conduct a gas repressurization/well stimulation project on a six well, 80-acre portion of the Dutcher Sand of the East Edna Field, Okmulgee County, Oklahoma. The site has been location of previous successful flue gas injection demonstration but due to changing economic and sales conditions, finds new opportunities to use associated natural gas that is currently being vented to the atmosphere to repressurize the reservoir to produce additional oil. The established infrastructure and known geological conditions should allow quick startup and much lower operating costs than flue gas. Lessons learned from the previous project, the lessons learnedmore » form cyclical oil prices and from other operators in the area will be applied. Technology transfer of the lessons learned from both projects could be applied by other small independent operators.« less
William T. Plass; Willis G. Vogel
1973-01-01
A survey of 39 surface-mine sites in southern West Virginia showed that most of the spoils from current mining operations had a pH of 5.0 or higher. Soil-size material averaged 37 percent of the weight of the spoils sampled. A major problem for the establishment of vegetation was a deficiency of nitrogen and phosphorus. This can be corrected with additions of...
Time Transfer Methodologies for International Atomic Time (TAI)
2007-01-01
International Atomic Time (TAI) and Coordinated Universal Time (UTC) involve either GPS or Two Way Satellite Time and Frequency Transfer ( TWSTFT ). This paper...NRCan, provide real-time carrier-phase based time transfer as well [3,4] Beginning in 2000, time-transfer links using TWSTFT replaced some GPS...links as the primary operational link, and currently over half the clocks used for TAI-generation are linked to other sites via a direct TWSTFT link
Pine Ridge Indian Health Service Primary Care Resident Rotation: a summary.
Jerde, O M; Vogt, H B
1996-10-01
The Pine Ridge Indian Health Service Primary Care Resident Rotation was officially established in January 1992 and operated through May 1996. Sponsored by an Indian Health Service grant, the rotation was conceived in an effort to help address the problem of recruitment and retention of physicians at Pin Ridge in the long term, while offering a unique educational experience for residents. Fifty-eight residents from 40 Family Practice, General Internal Medicine and General Pediatric Residency Programs in 18 states completed the rotation. Four of the rotation "graduates" are currently employed by the IHS at Pine Ridge and two other sites. A fifth physician provided short term service to a fourth site.
A tiered approach to distinguish sources of gasoline and diesel spills.
Xiong, Wenhui; Bernesky, Ryan; Bechard, Robert; Michaud, Guy; Lang, Jeremy
2014-07-15
Approximately 11% and 25% of annual Canadian oil spill accidents are gasoline and diesel spills, respectively. Gasoline and diesel spills are a challenge to conventional environmental forensic techniques because refinery processes remove most of the higher molecular weight biomarkers. This study presents a tiered environmental forensics strategy that includes such information as site operational history, geology/hydrogeology, GC/FID pre-screening, volatile GC/MS, semi-volatile GC/MS, and GC/MS selected ion monitoring (SIM) chromatograms for fingerprinting of gasoline and diesel spills. GC/FID pre-screening analysis identified the presence of two individual gasoline and diesel plumes at a fuel service station (study site). The gasoline plume is present between the upgradient fuel underground storage tanks (USTs) and the downgradient diesel plume, suggesting that the diesel impacts to groundwater may not be originated from the current UST leakage. Similar distribution of C3-alkylbenzenes (the most stable chemicals in gasoline) and the consistent diagnostic ratios of the analyte pairs with similar solubility indicate that the source for the dissolved gasoline constituents in the gasoline impacted zone likely originated from a gasoline leakage from the current USTs on the study site. In the diesel impacted zone, the distinct distribution and diagnostic ratios of sesquiterpanes (biomarkers for diesel) and alkylated PAHs confirm that the diesel plume originate from different crude oil sources than the current USTs. Copyright © 2014 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-01-22
Rinchem Company, Inc. once operated a chemical distribution business on a 1/2- to 2/3-acre industrial site at 5001 Edith Boulevard NE in Albuquerque, Bernalillo County, New Mexico. Groundwater within the site is contamined with volatile organic compounds (VOCs), such as trichloroethene. The company that currently occupies this site uses city water. The unlikely migration of VOCs from contaminated subsurface soil into the on-site building was examined and the VOC concentrations of indoor air were found to be well below the concentration of concern. However, precaution is needed if soil excavation is performed at some hot spots identified from soil gasmore » survey. Based on the information reviewed, the Agency for Toxic Substances and Disease Registry (ATSDR) has concluded that the old Rinchem site at 5001 Edith Boulevard NE, Albuquerque, New Mexico, is an indeterminate public health hazard. This conclusion is based on the fluctuating, low levels of VOC in a few on-site monitoring wells in the past decade. There are also no adequate data for evaluating off-site contamination in groundwater.« less
The Atmospheric Monitoring Strategy for the Cherenkov Telescope Array
NASA Astrophysics Data System (ADS)
Daniel, M. K.; CTA Consortium
2015-04-01
The Imaging Atmospheric Cherenkov Technique (IACT) is unusual in astronomy as the atmosphere actually forms an intrinsic part of the detector system, with telescopes indirectly detecting very high energy particles by the generation and transport of Cherenkov photons deep within the atmosphere. This means that accurate measurement, characterisation and monitoring of the atmosphere is at the very heart of successfully operating an IACT system. The Cherenkov Telescope Array (CTA) will be the next generation IACT observatory with an ambitious aim to improve the sensitivity of an order of magnitude over current facilities, along with corresponding improvements in angular and energy resolution and extended energy coverage, through an array of Large (23 m), Medium (12 m) and Small (4 m) sized telescopes spread over an area of order ~km2. Whole sky coverage will be achieved by operating at two sites: one in the northern hemisphere and one in the southern hemisphere. This proceedings will cover the characterisation of the candidate sites and the atmospheric calibration strategy. CTA will utilise a suite of instrumentation and analysis techniques for atmospheric modelling and monitoring regarding pointing forecasts, intelligent pointing selection for the observatory operations and for offline data correction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buelt, J.L.; Stottlemyre, J.A.; White, M.K.
1991-09-01
Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigations/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating establishment technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies requires by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buelt, J.L.; Stottlemyre, J.A.; White, M.K.
1991-02-01
Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating established technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies required by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, M.S.
The Barnwell Waste Management Facility (BWMF) is scheduled to restrict access to waste generators outside of the Atlantic Compact (SC, CT, NJ) on July 1, 2008. South Carolina, authorized under the Low-Level Waste Policy Act of 1980 and Amendments Act of 1985, and in agreement with the other Atlantic Compact states, will only accept Class A, B, and C low-level radioactive waste (LLRW) generated within compact. For many years, the BWMF has been the only LLRW disposal facility to accept Class B and C waste from LLRW generators throughout the country, except those that have access to the Northwest Compactmore » Site. Many Class B/C waste generators consider this to be a national crisis situation requiring interim or possible permanent storage, changes in operation, significant cost impacts, and/or elimination of services, especially in the health care and non-power generation industries. With proper in-house waste management practices and utilization of commercial processor services, a national crisis can be avoided, although some generators with specific waste forms or radionuclides will remain without options. In summary: It is unknown what the future will bring for commercial LLRW disposal. Could the anticipated post Barnwell Class B/C crisis be avoided by any of the following? - Barnwell Site remains open for the nation's commercial Class B/C waste; - Richland Site opens back up to the nation for commercial Class B/C waste; - Texas Site opens up to the nation for commercial Class B/C waste; - Federal Government intervenes by keeping a commercial Class B/C site open for the nation's commercial Class B/C waste; - Federal Government makes a DOE site available for commercial Class B/C waste; - Federal Government revisits the LLRW Policy Act of 1980 and Amendments Act of 1985. Without a future LLRW site capable of accepting Class B/C currently on the horizon, commercial LLRW generators are faced with waste volume elimination, reduction, or storage. With proper in-house waste management practices, utilization of commercial processor services and regulatory relief, a national crisis can be avoided. Waste volumes for storage can be reduced to as little as 10% of the current Class B/C volume. Although a national LLRW crisis can be avoided, some generators with specific waste forms or radionuclides will have a significant financial and/or operational impact due to a lack of commercial LLRW management options. (authors)« less
Mars Trek: An Interactive Web Portal for Current and Future Missions to Mars
NASA Technical Reports Server (NTRS)
Law, E.; Day, B.
2017-01-01
NASA's Mars Trek (https://marstrek.jpl.nasa.gov) provides a web-based Portal and a suite of interactive visualization and analysis tools to enable mission planners, lunar scientists, and engineers to access mapped data products from past and current missions to Mars. During the past year, the capabilities and data served by Mars Trek have been significantly expanded beyond its original design as a public outreach tool. At the request of NASA's Science Mission Directorate and Human Exploration Operations Mission Directorate, Mars Trek's technology and capabilities are now being extended to support site selection and analysis activities for the first human missions to Mars.
Cast Stone Formulation for Nuclear Waste Immobilization at Higher Sodium Concentrations
Fox, Kevin; Cozzi, Alex; Roberts, Kimberly; ...
2014-11-01
Low activity radioactive waste at U.S. Department of Energy sites can be immobilized for permanent disposal using cementitious waste forms. This study evaluated waste forms produced with simulated wastes at concentrations up to twice that of currently operating processes. The simulated materials were evaluated for their fresh properties, which determine processability, and cured properties, which determine waste form performance. The results show potential for greatly reducing the volume of material. Fresh properties were sufficient to allow for processing via current practices. Cured properties such as compressive strength meet disposal requirements. Leachability indices provide an indication of expected long-term performance.
Mars Trek: An Interactive Web Portal for Current and Future Missions to Mars
NASA Astrophysics Data System (ADS)
Law, E.; Day, B.
2017-09-01
NASA's Mars Trek (https://marstrek.jpl.nasa.gov) provides a web-based Portal and a suite of interactive visualization and analysis tools to enable mission planners, lunar scientists, and engineers to access mapped data products from past and current missions to Mars. During the past year, the capabilities and data served by Mars Trek have been significantly expanded beyond its original design as a public outreach tool. At the request of NASA's Science Mission Directorate and Human Exploration Operations Mission Directorate, Mars Trek's technology and capabilities are now being extended to support site selection and analysis activities for the first human missions to Mars.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilcox, Brian; Mellor, Russ; Michaluk, Craig
2013-07-01
Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less
ILRS: Current Status and Future Challenges
NASA Astrophysics Data System (ADS)
Pearlman, M. R.; Bianco, G.; Merkowitz, S.; Noll, C. E.; Pavlis, E. C.; Shargorodsky, V.; Zhongping, Z.
2016-12-01
The International Laser Ranging Service (ILRS) is expanding its ground tracking capability with new stations and upgrades to current stations. Our Russian colleagues have installed new stations in Brasilia and South Africa, and have several other sites in process or in planning. The NASA Space Geodesy Program is preparing equipment for U.S. sites (McDonald and Haleakala) and with the Norwegian National Mapping Agency in Ny Ålesund; further deployments are planned. Upgrades continue at sites in China, and new sites are underway or planned in Europe and India. Stations are moving to higher repetition rates and more efficient detection to enhance satellite interleaving capability; some stations have already implemented automated processes that could lead to around-the-clock operation to increase temporal coverage and to make more efficient use of personnel. The ILRS roster of supported satellites continues to grow with the addition of the LARES satellite to augment tracking for the improvement of the ITRF. New GNSS constellations and geosynchronous satellites now bring the total roster to over 80 satellites - so much so, that new tracking strategies and time and location multiplexing are under consideration. There continues to be strong interest in Lunar Ranging. New applications of one-way and two-way laser ranging include ps-accurate time transfer, laser transponders for interplanetary ranging, and tracking of space debris. New laser ranging data products are being developed, including satellite orbit products, satellite orientation, gravity field products, and products to characterize the quality of data and station performance. This talk will give a brief summary of recent progress, current challenges and a view of the path ahead.
Treatment of leachate by electrocoagulation using aluminum and iron electrodes.
Ilhan, Fatih; Kurt, Ugur; Apaydin, Omer; Gonullu, M Talha
2008-06-15
In this paper, treatment of leachate by electrocoagulation (EC) has been investigated in a batch process. The sample of leachate was supplied from Odayeri Landfill Site in Istanbul. Firstly, EC was compared with classical chemical coagulation (CC) process via COD removal. The first comparison results with 348 A/m2 current density showed that EC process has higher treatment performance than CC process. Secondly, effects of process variables such as electrode material, current density (from 348 to 631 A/m2), pH, treatment cost, and operating time for EC process are investigated on COD and NH4-N removal efficiencies. The appropriate electrode type search for EC provided that aluminum supplies more COD removal (56%) than iron electrode (35%) at the end of the 30 min operating time. Finally, EC experiments were also continued to determine the efficiency of ammonia removal, and the effects of current density, mixing, and aeration. All the findings of the study revealed that treatment of leachate by EC can be used as a step of a joint treatment.
Nevada National Security Site Environmental Report 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills
This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSERmore » summarizes data and compliance status for calendar year 2016 at the Nevada National Security Site (NNSS) and its two Nevada-based support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. In addition to the NNSA itself, the six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for its multiple missions. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, the Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).« less
Airborne and Ground-Based Optical Characterization of Legacy Underground Nuclear Test Sites
NASA Astrophysics Data System (ADS)
Vigil, S.; Craven, J.; Anderson, D.; Dzur, R.; Schultz-Fellenz, E. S.; Sussman, A. J.
2015-12-01
Detecting, locating, and characterizing suspected underground nuclear test sites is a U.S. security priority. Currently, global underground nuclear explosion monitoring relies on seismic and infrasound sensor networks to provide rapid initial detection of potential underground nuclear tests. While seismic and infrasound might be able to generally locate potential underground nuclear tests, additional sensing methods might be required to further pinpoint test site locations. Optical remote sensing is a robust approach for site location and characterization due to the ability it provides to search large areas relatively quickly, resolve surface features in fine detail, and perform these tasks non-intrusively. Optical remote sensing provides both cultural and surface geological information about a site, for example, operational infrastructure, surface fractures. Surface geological information, when combined with known or estimated subsurface geologic information, could provide clues concerning test parameters. We have characterized two legacy nuclear test sites on the Nevada National Security Site (NNSS), U20ak and U20az using helicopter-, ground- and unmanned aerial system-based RGB imagery and light detection and ranging (lidar) systems. The multi-faceted information garnered from these different sensing modalities has allowed us to build a knowledge base of how a nuclear test site might look when sensed remotely, and the standoff distances required to resolve important site characteristics.
Noise characterization of oil and gas operations.
Radtke, Cameron; Autenrieth, Daniel A; Lipsey, Tiffany; Brazile, William J
2017-08-01
In cooperation with The Colorado Oil and Gas Conservation Commission, researchers at Colorado State University performed area noise monitoring at 23 oil and gas sites throughout Northern Colorado. The goals of this study were to: (1) measure and compare the noise levels for the different phases of oil and gas development sites; (2) evaluate the effectiveness of noise barriers; and (3) determine if noise levels exceeded the Colorado Oil and Gas Conservation Commission noise limits. The four phases of oil and gas development include drilling, hydraulic fracturing, completion and production. Noise measurements were collected using the A- and C-weighted sound scales. Octave band analysis was also performed to characterize the frequency spectra of the noise measurements. Noise measurements were collected using noise dosimeters and a hand-held sound-level meter at specified distances from the development sites in each cardinal direction. At 350 ft (107 m), drilling, hydraulic fracturing, and completion sites without noise barriers exceeded the maximum permissible noise levels for residential and commercial zones (55 dBA and 60 dBA, respectively). In addition, drilling and hydraulic fracturing sites with noise barriers exceeded the maximum permissible noise level for residential zones (55 dBA). However, during drilling, hydraulic fracturing, and completion operations, oil producers are allowed an exception to the noise permissible limits in that they only must comply with the industrial noise limit (80 dBA). It is stated in Rule 604.c.(2)A. that: "Operations involving pipeline or gas facility installation or maintenance, the use of a drilling rig, completion rig, workover rig, or stimulation is subject to the maximum permissible noise levels for industrial zones (80dBA)." [8] Production sites were within the Colorado Oil and Gas Conservation Commission permissible noise level criteria for all zones. At 350 ft (107 m) from the noise source, all drilling, hydraulic fracturing, and completion sites exceeded 65 dBC. Current noise wall mitigation strategies reduced noise levels in both the A- and C-weighted scale measurements. However, this reduction in noise was not sufficient to reduce the noise below the residential permissible noise level (55 dBA).
Deactivation of the P, C, and R Reactor Disassembly Basins at the SRS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pickett, J.B.
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at 105-R Disassembly Basin and will continue with the 105-P and 105-C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion-exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds. A NEPA Environmental Assessment (EA) is being prepared to propose the preferred closure alternative for each of the three basins. The EA will be the primary mechanism to inform the public and gain stakeholder and regulatory approval.« less
Vascular Plants of the Hanford Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sackschewsky, Michael R.; Downs, Janelle L.
This report provides an updated listing of the vascular plants present on and near the U.S. Department of Energy Hanford Site. This document is an update of a listing of plants prepared by Sackschewdky et al. in 1992. Since that time there has been a significant increase in the botanical knowledge of the Hanford Site. The present listing is based on an examination of herbarium collections held at PNNL, at WSU-Tri Cities, WSU-Pullman, Bringham Young University, and The University of Washington, and on examination of ecological literature derived from the Hanford and Benton county areas over the last 100 years.more » Based on the most recent analysis, there are approximately 725 different plant species that have been documented on or around the Hanford Site. This represents an approximate 20% increase in the number of species reported within Sackschewsky et al. (1992). This listing directly supports DOE and contractor efforts to assess the potential impacts of Hanford Site operations on the biological environment, including impacts to rare habitats and to species listed as endangered or\\ threatened. This document includes a listing of plants currently listed as endangered, threatened, or otherwise of concern to the Washington Natural Heritage Program or the U.S. Fish and Wildlife Service, as well as those that are currently listed as noxious weeds by the State of Washington. Also provided is an overview of how plants on the Hanford Site can be used by people. This information may be useful in developing risk assessment models, and as supporting information for clean-up level and remediation decisions.« less
36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...
36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...
36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...
36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...
36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Programs
The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Wastemore » Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.« less
East, Amy E.; Collins, Brian D.; Sankey, Joel B.; Corbett, Skye C.; Fairley, Helen C.; Caster, Joshua J.
2016-05-17
We conclude that most of the river-corridor archeological sites are at elevated risk of net erosion under present dam operations. In the present flow regime, controlled floods do not simulate the magnitude or frequency of natural floods, and are not large enough to deposit sand at elevations that were flooded at annual to decadal intervals in predam time. For archeological sites that depend upon river-derived sand, we infer elevated erosion risk owing to a combination of reduced sand supply (both fluvial and aeolian) through (1) the lower-than-natural flood magnitude, frequency, and sediment supply of the controlled-flooding protocol; (2) reduction of open, dry sand area available for wind redistribution under current normal (nonflood) dam operations, which do not include flows as low as natural seasonal low flows and do include substantial daily flow fluctuations; and (3) impeded aeolian sand entrainment and transport owing to increased riparian vegetation growth in the absence of larger, more-frequent floods. If dam operations were to increase the supply of sand available for windblown transport—for example, through larger floods, sediment augmentation, or increased fluvial sandbar exposure by low flows—and also decrease riparian vegetation, the prevalence of active aeolian sand could increase over time, and the propensity for unmitigated gully erosion could decrease. Although the evolution of river-corridor landscapes and archeological sites has been altered fundamentally by the lack of large, sediment-rich floods (flows on the order of 5,000 m3/s), some combination of sediment-rich flows above 1,270 m3/s, seasonal flows below 226 m3/s, and riparian-vegetation removal might increase the preservation potential for sand-dependent archeological resources in the Colorado River corridor.
Lessons from Fukushima for Improving the Safety of Nuclear Reactors
NASA Astrophysics Data System (ADS)
Lyman, Edwin
2012-02-01
The March 2011 accident at the Fukushima Daiichi nuclear power plant has revealed serious vulnerabilities in the design, operation and regulation of nuclear power plants. While some aspects of the accident were plant- and site-specific, others have implications that are broadly applicable to the current generation of nuclear plants in operation around the world. Although many of the details of the accident progression and public health consequences are still unclear, there are a number of lessons that can already be drawn. The accident demonstrated the need at nuclear plants for robust, highly reliable backup power sources capable of functioning for many days in the event of a complete loss of primary off-site and on-site electrical power. It highlighted the importance of detailed planning for severe accident management that realistically evaluates the capabilities of personnel to carry out mitigation operations under extremely hazardous conditions. It showed how emergency plans rooted in the assumption that only one reactor at a multi-unit site would be likely to experience a crisis fail miserably in the event of an accident affecting multiple reactor units simultaneously. It revealed that alternate water injection following a severe accident could be needed for weeks or months, generating large volumes of contaminated water that must be contained. And it reinforced the grim lesson of Chernobyl: that a nuclear reactor accident could lead to widespread radioactive contamination with profound implications for public health, the economy and the environment. While many nations have re-examined their policies regarding nuclear power safety in the months following the accident, it remains to be seen to what extent the world will take the lessons of Fukushima seriously and make meaningful changes in time to avert another, and potentially even worse, nuclear catastrophe.
Evidence for a persistent microbial seed bank throughout the global ocean
Gibbons, Sean M.; Caporaso, J. Gregory; Pirrung, Meg; Field, Dawn; Knight, Rob; Gilbert, Jack A.
2013-01-01
Do bacterial taxa demonstrate clear endemism, like macroorganisms, or can one site’s bacterial community recapture the total phylogenetic diversity of the world’s oceans? Here we compare a deep bacterial community characterization from one site in the English Channel (L4-DeepSeq) with 356 datasets from the International Census of Marine Microbes (ICoMM) taken from around the globe (ranging from marine pelagic and sediment samples to sponge-associated environments). At the L4-DeepSeq site, increasing sequencing depth uncovers greater phylogenetic overlap with the global ICoMM data. This site contained 31.7–66.2% of operational taxonomic units identified in a given ICoMM biome. Extrapolation of this overlap suggests that 1.93 × 1011 sequences from the L4 site would capture all ICoMM bacterial phylogenetic diversity. Current technology trends suggest this limit may be attainable within 3 y. These results strongly suggest the marine biosphere maintains a previously undetected, persistent microbial seed bank. PMID:23487761
40 CFR 63.8782 - Am I subject to this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations... you own or operate a flexible polyurethane foam fabrication plant site that operates a flame... flexible polyurethane foam fabrication plant site is a plant site where pieces of flexible polyurethane...
40 CFR 63.8782 - Am I subject to this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations... you own or operate a flexible polyurethane foam fabrication plant site that operates a flame... flexible polyurethane foam fabrication plant site is a plant site where pieces of flexible polyurethane...
40 CFR 63.8782 - Am I subject to this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations... you own or operate a flexible polyurethane foam fabrication plant site that operates a flame... flexible polyurethane foam fabrication plant site is a plant site where pieces of flexible polyurethane...
40 CFR 63.8782 - Am I subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations... you own or operate a flexible polyurethane foam fabrication plant site that operates a flame... flexible polyurethane foam fabrication plant site is a plant site where pieces of flexible polyurethane...
40 CFR 63.8782 - Am I subject to this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations... you own or operate a flexible polyurethane foam fabrication plant site that operates a flame... flexible polyurethane foam fabrication plant site is a plant site where pieces of flexible polyurethane...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...
Kregting, Louise; Elsaesser, Bjoern; Kennedy, Robert; Smyth, David; O'Carroll, Jack; Savidge, Graham
2016-01-01
Arrays of tidal energy converters have the potential to provide clean renewable energy for future generations. Benthic communities may, however, be affected by changes in current speeds resulting from arrays of tidal converters located in areas characterised by strong currents. Current speed, together with bottom type and depth, strongly influence benthic community distributions; however the interaction of these factors in controlling benthic dynamics in high energy environments is poorly understood. The Strangford Lough Narrows, the location of SeaGen, the world's first single full-scale, grid-compliant tidal energy extractor, is characterised by spatially heterogenous high current flows. A hydrodynamic model was used to select a range of benthic community study sites that had median flow velocities between 1.5-2.4 m/s in a depth range of 25-30 m. 25 sites were sampled for macrobenthic community structure using drop down video survey to test the sensitivity of the distribution of benthic communities to changes in the flow field. A diverse range of species were recorded which were consistent with those for high current flow environments and corresponding to very tide-swept faunal communities in the EUNIS classification. However, over the velocity range investigated, no changes in benthic communities were observed. This suggested that the high physical disturbance associated with the high current flows in the Strangford Narrows reflected the opportunistic nature of the benthic species present with individuals being continuously and randomly affected by turbulent forces and physical damage. It is concluded that during operation, the removal of energy by marine tidal energy arrays in the far-field is unlikely to have a significant effect on benthic communities in high flow environments. The results are of major significance to developers and regulators in the tidal energy industry when considering the environmental impacts for site licences.
Kregting, Louise; Elsaesser, Bjoern; Kennedy, Robert; Smyth, David; O’Carroll, Jack; Savidge, Graham
2016-01-01
Arrays of tidal energy converters have the potential to provide clean renewable energy for future generations. Benthic communities may, however, be affected by changes in current speeds resulting from arrays of tidal converters located in areas characterised by strong currents. Current speed, together with bottom type and depth, strongly influence benthic community distributions; however the interaction of these factors in controlling benthic dynamics in high energy environments is poorly understood. The Strangford Lough Narrows, the location of SeaGen, the world’s first single full-scale, grid-compliant tidal energy extractor, is characterised by spatially heterogenous high current flows. A hydrodynamic model was used to select a range of benthic community study sites that had median flow velocities between 1.5–2.4 m/s in a depth range of 25–30 m. 25 sites were sampled for macrobenthic community structure using drop down video survey to test the sensitivity of the distribution of benthic communities to changes in the flow field. A diverse range of species were recorded which were consistent with those for high current flow environments and corresponding to very tide-swept faunal communities in the EUNIS classification. However, over the velocity range investigated, no changes in benthic communities were observed. This suggested that the high physical disturbance associated with the high current flows in the Strangford Narrows reflected the opportunistic nature of the benthic species present with individuals being continuously and randomly affected by turbulent forces and physical damage. It is concluded that during operation, the removal of energy by marine tidal energy arrays in the far-field is unlikely to have a significant effect on benthic communities in high flow environments. The results are of major significance to developers and regulators in the tidal energy industry when considering the environmental impacts for site licences. PMID:27560657
Signatures of a staggered-flux phase in the t-J model with two holes on a 32-site lattice
NASA Astrophysics Data System (ADS)
Leung, P. W.
2000-09-01
We study the relevance of the staggered-flux phase in the t-J model using a system with two holes on a 32-site lattice with periodic boundary conditions. We find a staggered-flux pattern in the current-current correlation in the lowest energy d-wave state where there is mutual attraction between the holes. This staggered correlation decays faster with distance when the hole binding becomes stronger. This is in complete agreement with a recent study by Ivanov, Lee, and Wen [Phys. Rev. Lett. 84, 3958 (2000)] based on the SU(2) theory, and strongly suggests that the staggered-flux phase is a key ingredient in the t-J model. We further show that this staggered-flux pattern does not exist in a state where the holes repel each other. Correlations of the chirality operator S1.(S2×S3) show that the staggered pattern of the chirality is closely tied to the holes.
Wildlife conservation and solar energy development in the Desert Southwest, United States
Lovich, Jeffrey E.; Ennen, Josua R.
2011-01-01
Large areas of public land are currently being permitted or evaluated for utility-scale solar energy development (USSED) in the southwestern United States, including areas with high biodiversity and protected species. However, peer-reviewed studies of the effects of USSED on wildlife are lacking. The potential effects of the construction and the eventual decommissioning of solar energy facilities include the direct mortality of wildlife; environmental impacts of fugitive dust and dust suppressants; destruction and modification of habitat, including the impacts of roads; and off-site impacts related to construction material acquisition, processing, and transportation. The potential effects of the operation and maintenance of the facilities include habitat fragmentation and barriers to gene flow, increased noise, electromagnetic field generation, microclimate alteration, pollution, water consumption, and fire. Facility design effects, the efficacy of site-selection criteria, and the cumulative effects of USSED on regional wildlife populations are unknown. Currently available peer-reviewed data are insufficient to allow a rigorous assessment of the impact of USSED on wildlife.
NASA Astrophysics Data System (ADS)
Czapla-Myers, Jeffrey; McCorkel, Joel; Anderson, Nikolaus; Biggar, Stuart
2018-01-01
This paper describes the current ground-based calibration results of Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Terra and Aqua Moderate Resolution Imaging Spectroradiometer (MODIS), Suomi National Polar orbiting Partnership Visible Infrared Imaging Radiometer Suite (VIIRS), and Sentinel-2A Multispectral Instrument (MSI), using an automated suite of instruments located at Railroad Valley, Nevada, USA. The period of this study is 2012 to 2016 for MODIS, VIIRS, and ETM+, 2013 to 2016 for OLI, and 2015 to 2016 for MSI. The current results show that all sensors agree with the Radiometric Calibration Test Site (RadCaTS) to within ±5% in the solar-reflective regime, except for one band on VIIRS that is within ±6%. In the case of ETM+ and OLI, the agreement is within ±3%, and, in the case of MODIS, the agreement is within ±3.5%. MSI agrees with RadCaTS to within ±4.5% in all applicable bands.
Application of ERTS-1 data to the protection and management of New Jersey's coastal environment
NASA Technical Reports Server (NTRS)
Yunghans, R. S. (Principal Investigator); Feinberg, E. B.; Stitt, J. A.; Mairs, R. L.; Wobber, F. J.; Macomber, R. T.; Stanczuk, D. T.; Thibult, D.
1974-01-01
The author has identified the following significant results. Quasi-operational information products for coastal zone management have been prepared using ERTS-1 imagery and collateral aerial photography. These products were applied to the practical regulation, protection, and management of New Jersey's coastal environment. Procedures were developed for the operational use of ERTS-1 data products within New Jersey's Department of Environmental Protection. Successful analysis and product preparation for operational needs centered on four major coastal resource problem areas: (1) detection of environmental changes in coastal areas, (2) siting of ocean outfalls, (3) monitoring of offshore waste disposal, and (4) calculation of recession rates along the Atlantic Shore. The utility and monetary benefits derived from ERTS and aircraft imagery for each problem area have been determined. The NJDEP estimates the possibility of $620,000 yearly savings through the use of an operational ERTS system and a one-time savings of $2.8 million on current or planned projects if a truly operational ERTS type satellite were available.
Goudeau, V; Daniel, B; Dubot, D
2017-04-21
During the operation and the decommissioning of a nuclear site the operator must assure the protection of the workers and the environment. It must furthermore identify and classify the various wastes, while optimizing the associated costs. At all stages of the decommissioning radiological measurements are performed to determine the initial situation, to monitor the demolition and clean-up, and to verify the final situation. Radiochemical analysis is crucial for the radiological evaluation process to optimize the clean-up operations and to the respect limits defined with the authorities. Even though these types of analysis are omnipresent in activities such as the exploitation, the monitoring, and the cleaning up of nuclear plants, some nuclear sites do not have their own radiochemical analysis laboratory. Mobile facilities can overcome this lack when nuclear facilities are dismantled, when contaminated sites are cleaned-up, or in a post-accident situation. The current operations for the characterization of radiological soils of CEA nuclear facilities, lead to a large increase of radiochemical analysis. To manage this high throughput of samples in a timely manner, the CEA has developed a new mobile laboratory for the clean-up of its soils, called SMaRT (Shelter for Monitoring and nucleAR chemisTry). This laboratory is dedicated to the preparation and the radiochemical analysis (alpha, beta, and gamma) of potentially contaminated samples. In this framework, CEA and Eichrom laboratories has signed a partnership agreement to extend the analytical capacities and bring on site optimized and validated methods for different problematic. Gamma-emitting radionuclides can usually be measured in situ as little or no sample preparation is required. Alpha and beta-emitting radionuclides are a different matter. Analytical chemistry laboratory facilities are required. Mobile and transportable laboratories equipped with the necessary tools can provide all that is needed. The main advantage of a mobile laboratory is its portability; the shelter can be placed in the vicinity of nuclear facilities under decommissioning, or of contaminated sites with infrastructures unsuitable for the reception and treatment of radioactive samples. Radiological analysis can then be performed without the disadvantages of radioactive material transport. This paper describes how this solution allows a fast response and control of costs, with a high analytical capacity. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and othermore » environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-03-26
The Tansitor Electronics, Inc. site, located in Bennington, Bennington County, Vermont, has been proposed by the Environmental Protection Agency for inclusion onto the National Priorities List (NPL). Most of the investigations into site contamination have been coordinated by the Vermont Department of Environmental Conservation. Tansitor Electronics, Inc. operates an electronic capacitor manufacturing facility on a 36-acre parcel located along Route 9 and about 3 miles west of downtown Bennington, Bennington County, Vermont. The site is of potential public health concern because of the risk to human health resulting from possible exposure to hazardous substances at concentrations that may result inmore » adverse health effects. There are no monitoring data or information indicating that appreciable human exposure to site-related contaminants is currently occurring. However, additional monitoring data or information is needed to evaluate the on-site and off-site ground water (shallow aquifer and bedrock aquifer), ambient air, sediment, surface soil, and surface water. The monitoring data or information may form the basis of future ATSDR evaluation of the undefined human exposure pathways and public health implications associated with these pathways. The site is not recommended for follow-up health activities at this time.« less
NASA Astrophysics Data System (ADS)
Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.
2016-12-01
The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.
The GOES-R Rebroadcast (GRB) Data Stream Simulator
NASA Astrophysics Data System (ADS)
Dittberner, G. J.; Gibbons, K.; Czopkiewicz, E.; Miller, C.; Brown-Bergtold, B.; Haman, B.; Marley, S.
2013-12-01
GOES Rebroadcast (GRB) signals in the GOES-R era will replace the current legacy GOES Variable (GVAR) signal and will have substantially different characteristics, including a change in data rate from a single 2.1 Mbps stream to two digital streams of 15.5 Mbps each. Five GRB Simulators were developed as portable systems that output a high-fidelity stream of Consultative Committee for Space Data Systems (CCSDS) formatted GRB packet data equivalent to live GRB data. The data are used for on-site testing of user ingest and data handling systems known as field terminal sites. The GRB Simulator is a fully self-contained system which includes all software and hardware units needed for operation. The operator manages configurations to edit preferences, define individual test scenarios, and manage event logs and reports. Simulations are controlled by test scenarios, which are scripts that specify the test data and provide a series of actions for the GRB Simulator to perform when generating GRB output. Scenarios allow for the insertion of errors or modification of GRB packet headers for testing purposes. The GRB Simulator provides a built-in editor for managing scenarios. The GRB Simulator provides GRB data as either baseband (digital) or Intermediate Frequency (IF) output to the test system. GRB packet data are sent in the same two output streams used in the operational system: one for Left Hand Circular Polarization (LHCP) and one for Right Hand Circular Polarization (RHCP). Use of circular polarization in the operational system allows the transmitting antenna to multiplex the two digital streams into the same signal, thereby doubling the available bandwidth. The GRB Simulator is designed to be used at sites that receive the GRB downlink.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document presents the selected remedial action for Operable Unit Two for the Texarkana Wood Preserving Company (TWPC) Superfund Site (Site) in Texarkana, Texas. This operable unit is the second of two operable units planned for the Site. Operable Unit Two involves remediation of the deeper ground water contaminated above the action levels in a limited area of the Silty Sand Zone around Monitoring Well-16.
2016-06-01
site customization of existing models. The author performed an empirical study centered around a survey of United States Marine Corps (USMC) and United...recommends that more studies be performed to determine the best way forward for AM within the USMC and USN. 14. SUBJECT TERMS 3D printing, additive...customization of existing models. The author performed an em- pirical study centered around a survey of United States Marine Corps (USMC) and United
Delivery of Fuel and Construction Materials to South Pole Station
1993-07-01
AID-A270 431 Delivery of Fuel and Construction Materials to South Pole Station Stephen L. DenHartog and George L. Blaisdell July 993 DTIC ELECT S OCT...South Pole Station, ideally with minimal impact on the current science and operational program. The new station will require the delivery of massive...amounts of construction materials to this remote site. The existing means of delivering material and fuel to the South Pole include the use of specialized
Project Ares: A Systems Engineering and Operations Architecture for the Exploration of Mars
1992-03-20
increased use of automation, experiential databases , expert systems, and fail-soft’ configurations and designs (33:252-253). Automatic communication relay and...communications satellite’s lifetimes, we assume that uplink data rates on the order of 10 Kbps should suffice for command and database uploads. Current...squashed, 20-sided polyhedron configuration which should be relatively easy to obtain. Thus, two extremes for configuration exist. At one end is the site
Small launchers (current and future projects in the world)
NASA Astrophysics Data System (ADS)
Naumann, W. G.
1993-01-01
Small satellites need launching services using small launchers capable of injecting 100 to 1000 kg into a polar orbit at an altitude of 1000 km. Operational small launchers are reviewed as well as developing and planned ones. Launcher characteristics, constraints, performance, and status are detailed. Few technical problems are encountered, as most launcher projects call for existing components and well known technologies. Most of the difficulties have come from launch site availability and from financial considerations.
Nelson, David R
2009-10-01
The Cytochrome P450 Homepage is a universal resource for nomenclature and sequence information on cytochrome P450 ( CYP ) genes. The site has been in continuous operation since February 1995. Currently, naming information for 11,512 CYPs are available on the web pages. The P450 sequences are manually curated by David Nelson, and the nomenclature system conforms to an evolutionary scheme such that members of CYP families and subfamilies share common ancestors. The organisation and content of the Homepage are described.
Kimura, Koji; Sawa, Akihiro; Akagi, Shinji; Kihira, Kenji
2007-06-01
We have developed an original system to conduct surgical site infection (SSI) surveillance. This system accumulates SSI surveillance information based on the National Nosocomial Infections Surveillance (NNIS) System and the Japanese Nosocomial Infections Surveillance (JNIS) System. The features of this system are as follows: easy input of data, high generality, data accuracy, SSI rate by operative procedure and risk index category (RIC) can be promptly calculated and compared with the current NNIS SSI rate, and the SSI rates and accumulated data can be exported electronically. Using this system, we monitored 798 patients in 24 operative procedure categories in the Digestive Organs Surgery Department of Mazda Hospital, Mazda Motor Corporation, from January 2004 through December 2005. The total number and rate of SSI were 47 and 5.89%, respectively. The SSI rates of 777 patients were calculated based on 15 operative procedure categories and Risk Index Categories (RIC). The highest SSI rate was observed in the rectum surgery of RIC 1 (30%), followed by the colon surgery of RIC3 (28.57%). About 30% of the isolated infecting bacteria were Enterococcus faecalis, Staphylococcus aureus, Klebsiella pneumoniae, Pseudomonas aeruginosa, and Escherichia coli. Using quantification theory type 2, the American Society of Anesthesiology score (4.531), volume of hemorrhage under operation (3.075), wound classification (1.76), operation time (1.352), and history of diabetes (0.989) increased to higher ranks as factors for SSI. Therefore, we evaluated this system as a useful tool in safety control for operative procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiff, Scott D.; Dazeley, Steven; Reyna, David
The current state-of-the-art in antineutrino detection is such that it is now possible to remotely monitor the operational status, power levels and fissile content of nuclear reactors in real-time. This non-invasive and incorruptible technique has been demonstrated at civilian power reactors in both Russia and the United States and has been of interest to the IAEA Novel Technologies Unit for several years. Expert's meetings were convened at IAEA headquarters in 2003 and again in 2008. The latter produced a report in which antineutrino detection was called a 'highly promising technology for safeguards applications' at nuclear reactors and several near-term goalsmore » and suggested developments were identified to facilitate wider applicability. Over the last few years, we have been working to achieve some of these goals and improvements. Specifically, we have already demonstrated the successful operation of non-toxic detectors and most recently, we are testing a transportable, above-ground detector system, which is fully contained within a standard 6 meter ISO container. If successful, such a system could allow easy deployment at any reactor facility around the world. As well, our previously demonstrated ability to remotely monitor the data and respond in real-time to reactor operational changes could allow the verification of operator declarations without the need for costly site-visits. As the global nuclear power industry expands around the world, the burden on maintaining operational histories and safeguarding inventories will increase greatly. Such a system for providing remote data to verify operator's declarations could greatly reduce the need for frequent site inspections while still providing a robust warning of anomalies requiring further investigation.« less
Antolino, Dominick J.; Chapman, Melinda J.
2017-01-06
The U.S. Geological Survey South Atlantic Water Science Center collected borehole geophysical logs and images and continuous water-level data near the GMH Electronics National Priorities List Superfund site near Roxboro, North Carolina, during December 2012 through July 2015. Previous work by the U.S. Geological Survey South Atlantic Water Science Center at the site involved the collection of borehole geophysical log data in 15 wells, in addition to surface geologic mapping and passive diffusion bag sampling. In a continued effort to assist the U.S. Environmental Protection Agency in developing a conceptual groundwater model to assess current contaminant distribution and future migration of contaminants, more than 900 subsurface features (primarily fracture orientations) in 10 open borehole wells were delineated and continuous water-level data information from 14 monitoring wells within close proximity of the initially drilled boreholes was collected to observe any induced water-level fluctuations during drilling operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-06-30
The 20-acre USA Aberdeen Michaelsville Landfill is a municipal landfill located along the Chesapeake Bay in Harford County, Maryland. The site is in the northern portion of the Aberdeen Proving Ground (APG) in the Aberdeen Area (AA) between Michaelsville Road and Trench Warfare Road. The majority of materials reportedly disposed of at the site included domestic trash, trash from nonindustrial sources at APG, solvents, waste motor oils, PCB transformer oils, wastewater treatment sludges, pesticides containing thallium, insecticides containing selenium, and rodenticides containing antimony. The ROD addresses protection of the ground water by minimizing leachate flow and preventing current or futuremore » exposure to waste materials as the first of two OUs planned for the site. The primary contaminants of concern affecting the soil are organics, including pesticides; and metals, including chromium and lead.« less
Meyer, Thomas; Melin, Frédéric; Richter, Oliver-M H; Ludwig, Bernd; Kannt, Aimo; Müller, Hanne; Michel, Hartmut; Hellwig, Petra
2015-02-27
Two different pathways through which protons access cytochrome c oxidase operate during oxygen reduction from the mitochondrial matrix, or the bacterial cytoplasm. Here, we use electrocatalytic current measurements to follow oxygen reduction coupled to proton uptake in cytochrome c oxidase isolated from Paracoccus denitrificans. Wild type enzyme and site-specific variants with defects in both proton uptake pathways (K354M, D124N and K354M/D124N) were immobilized on gold nanoparticles, and oxygen reduction was probed electrochemically in the presence of varying concentrations of Zn(2+) ions, which are known to inhibit both the entry and the exit proton pathways in the enzyme. Our data suggest that under these conditions substrate protons gain access to the oxygen reduction site via the exit pathway. Copyright © 2015 Federation of European Biochemical Societies. Published by Elsevier B.V. All rights reserved.
The optical very large array and its moon-based version
NASA Technical Reports Server (NTRS)
Labeyrie, Antoine
1992-01-01
An Optical Very Large Array (OVLA) is currently in early prototyping stages for ground-based sites, such as Mauna Kea and perhaps the VLT site in Chile. Its concept is also suited for a moon-based interferometer. With a ring of bi-dimensionally mobile telescopes, there is maximal flexibility in the aperture pattern, and no need for delay lines. A circular configuration of many free-flying telescopes, TRIO, is also considered for space interferometers. Finally, the principle of gaseous mirrors may become applicable for moon-based optical arrays. Fifteen years after the first coherent linkage of two optical telescopes, the design of an ambitious imaging array, the OVLA, is now well advanced. Two 1.5 m telescopes have been built and now provide astronomical results. Elements of the OVLA are under construction. Although primarily conceived for ground-based sites, the OVLA structure appears to meet the essential requirements for operation on the Moon.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
..., Inc., Wealth Management Americas Operations, Including On-Site Leased Workers From Leafstone... Services, Inc., Wealth Management Americas Operations (UBS), Weehawken, New Jersey. The workers are engaged... to include all leased workers on-site at UBS Financial Services, Inc., Wealth Management Americas...
An evaluation of SAO sites for laser operations
NASA Technical Reports Server (NTRS)
Thorp, J. M.; Bush, M. A.; Pearlman, M. R.
1974-01-01
Operational criteria are provided for the selection of laser tracking sites for the Earth and Ocean Physics Applications Program. A compilation of data is given concerning the effect of weather conditions on laser and Baker-Nunn camera operations. These data have been gathered from the Smithsonian astrophysical observing station sites occupied since the inception of the satellite tracking program. Also given is a brief description of each site, including its characteristic weather conditions, comments on communications and logistics, and a summary of the terms of agreement under which the station is or was operated.
WIYN: A New Technology Telescope on Kitt Peak
NASA Astrophysics Data System (ADS)
Silva, David R.
1995-05-01
The WIYN Observatory, a joint venture between the University of Wisconsin (W), Indiana University (I), Yale University (Y), and the National Optical Astronomy Observatories (N), is a new technology alt-az 3.5m telescope located on Kitt Peak. Science operations are scheduled to begin during July 1995. WIYN has achieved site-limited delivered image quality (DIQ) through a combination of careful site selection, enclosure thermal control, and active optics techniques. The Observatory site was selected based on previous empirical observations of sub-arcsecond images. Heat from the enclosure is vented actively and passively: with 2 m/s winds, the observing chamber volume is exchanged roughly once per minute. The temperature and shape of the lightweight primary mirror, spun-cast by the Steward Observatory Mirror Lab, are maintained by control systems developed by NOAO. These systems maintain the mirror temperature within 0.2 deg C of ambient and the total delivered wavefront error within 150 nm RMS of the ideal. The measured WIYN median DIQ was 0.7'' FWHM for the period June 1994 through January 1995. The main facility instruments, the Multi-Object Spectrograph (MOS/Hydra) and the WIYN Imager, are currently being commissioned simultaneously at the two Nasymth foci. A f/6.3, 1 deg corrected beam is presented to MOS/Hydra while the beam presented to the Imager is corrected over 0.5 deg. The WIYN control system is based on a distributed network of real-time and time-sharing processors linked together by a low-bandwidth asynchronous message passing system. This architecture is robust, easily expandable, and amenable to remote operations. The baseline system was designed and implemented by the University of Wisconsin Controls Group. Current telescope performance and commissioning progress will be presented at the Meeting.
NASA Astrophysics Data System (ADS)
Skafte, Theis Løye; Blennow, Peter; Hjelm, Johan; Graves, Christopher
2018-01-01
Reduction of CO2 to CO and O2 in the solid oxide electrolysis cell (SOEC) has the potential to play a crucial role in closing the CO2 loop. Carbon deposition in nickel-based cells is however fatal and must be considered during CO2 electrolysis. Here, the effect of operating parameters is investigated systematically using simple current-potential experiments. Due to variations of local conditions, it is shown that higher current density and lower fuel electrode porosity will cause local carbon formation at the electrochemical reaction sites despite operating with a CO outlet concentration outside the thermodynamic carbon formation region. Attempts at mitigating the issue by coating the composite nickel/yttria-stabilized zirconia electrode with carbon-inhibiting nanoparticles and by sulfur passivation proved unsuccessful. Increasing the fuel electrode porosity is shown to mitigate the problem, but only to a certain extent. This work shows that a typical SOEC stack converting CO2 to CO and O2 is limited to as little as 15-45% conversion due to risk of carbon formation. Furthermore, cells operated in CO2-electrolysis mode are poisoned by reactant gases containing ppb-levels of sulfur, in contrast to ppm-levels for operation in fuel cell mode.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John R.
This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Areamore » [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.« less
Design of a multiband near-infrared sky brightness monitor using an InSb detector.
Dong, Shu-Cheng; Wang, Jian; Tang, Qi-Jie; Jiang, Feng-Xin; Chen, Jin-Ting; Zhang, Yi-Hao; Wang, Zhi-Yue; Chen, Jie; Zhang, Hong-Fei; Jiang, Hai-Jiao; Zhu, Qing-Feng; Jiang, Peng; Ji, Tuo
2018-02-01
Infrared sky background level is an important parameter of infrared astronomy observations from the ground, particularly for a candidate site of an infrared capable observatory since low background level is required for such a site. The Chinese astronomical community is looking for a suitable site for a future 12 m telescope, which is designed for working in both optical and infrared wavelengths. However, none of the proposed sites has been tested for infrared observations. Nevertheless, infrared sky background measurements are also important during the design of infrared observing instruments. Based on the requirement, in order to supplement the current site survey data and guide the design of future infrared instruments, a multiband near-infrared sky brightness monitor (MNISBM) based on an InSb sensor is designed in this paper. The MNISBM consists of an optical system, mechanical structure and control system, detector and cooler, high gain readout electronics, and operational software. It is completed and tested in the laboratory. The results show that the sensitivity of the MNISBM meets the requirements of the measurement of near-infrared sky background level of several well-known astronomical infrared observing sites.
Design of a multiband near-infrared sky brightness monitor using an InSb detector
NASA Astrophysics Data System (ADS)
Dong, Shu-cheng; Wang, Jian; Tang, Qi-jie; Jiang, Feng-xin; Chen, Jin-ting; Zhang, Yi-hao; Wang, Zhi-yue; Chen, Jie; Zhang, Hong-fei; Jiang, Hai-jiao; Zhu, Qing-feng; Jiang, Peng; Ji, Tuo
2018-02-01
Infrared sky background level is an important parameter of infrared astronomy observations from the ground, particularly for a candidate site of an infrared capable observatory since low background level is required for such a site. The Chinese astronomical community is looking for a suitable site for a future 12 m telescope, which is designed for working in both optical and infrared wavelengths. However, none of the proposed sites has been tested for infrared observations. Nevertheless, infrared sky background measurements are also important during the design of infrared observing instruments. Based on the requirement, in order to supplement the current site survey data and guide the design of future infrared instruments, a multiband near-infrared sky brightness monitor (MNISBM) based on an InSb sensor is designed in this paper. The MNISBM consists of an optical system, mechanical structure and control system, detector and cooler, high gain readout electronics, and operational software. It is completed and tested in the laboratory. The results show that the sensitivity of the MNISBM meets the requirements of the measurement of near-infrared sky background level of several well-known astronomical infrared observing sites.
Water Resources Data, New Jersey, Water Year 2003; Volume 3. Water-Quality Data
DeLuca, Michael J.; Hoppe, Heidi L.; Heckathorn, Heather A.; Riskin, Melissa L.; Gray, Bonnie J.; Melvin, Emma-Lynn; Liu, Nicholas A.
2004-01-01
Water-resources data for the 2003 water year for New Jersey are presented in three volumes, and consists of records of stage, discharge, and water-quality of streams; stage and contents of lakes and reservoirs; and water levels and water-quality of ground water. Volume 3 contains a summary of surface- and ground-water hydrologic conditions for the 2003 water year, a listing of current water-resources projects in New Jersey, a bibliography of water-related reports, articles, and fact sheets for New Jersey completed by the Geological Survey in recent years, water-quality records of chemical analyses from 123 continuing-record surface-water stations, 35 ground-water sites, records of daily statistics of temperature and other physical measurements from 20 continuous-recording stations, and 5 special-study sites consisting of 2 surface-water sites, 1 spring site, and 240 groundwater sites. Locations of water-quality stations are shown in figures 21-25. Locations of special-study sites are shown in figures 49-53. These data represent that part of the National Water Data System operated by the U.S. Geological Survey and cooperating federal, state, and local agencies in New Jersey.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, E.C.; Killough, S.M.; Rowe, J.C.
The purpose of the Smart Crane Ammunition Transfer System (SCATS) project is to demonstrate robotic/telerobotic controls technology for a mobile articulated crane for missile/ munitions handling, delivery, and reload. Missile resupply and reload have been manually intensive operations up to this time. Currently, reload missiles are delivered by truck to the site of the launcher. A crew of four to five personnel reloads the missiles from the truck to the launcher using a hydraulic-powered crane. The missiles are handled carefully for the safety of the missiles and personnel. Numerous steps are required in the reload process and the entire reloadmore » operation can take over 1 h for some missile systems. Recent U.S. Army directives require the entire operation to be accomplished in a fraction of that time. Current requirements for the development of SCATS are being based primarily on reloading Patriot missiles. The planned development approach will integrate robotic control and sensor technology with a commercially available hydraulic articulated crane. SCATS is being developed with commercially available hardware as much as possible. Development plans include adding a 3-D.F. end effector with a grapple to the articulating crane; closed-loop position control for the crane and end effector; digital microprocessor control of crane functions; simplified operator interface; and operating modes which include rectilinear movement, obstacle avoidance, and partial automated operation. The planned development will include progressive technology demonstrations. Ultimate plans are for this technology to be transferred and utilized in the military fielding process.« less
NASA Astrophysics Data System (ADS)
Melville, R.; Stillinger, A.; Gerrard, A.; Weatherwax, A.
2014-04-01
The need to provide power to unmanned instrumentation over the course of an entire year on the Antarctic plateau presents a large number of engineering and logistical challenges. Designs formulated in ideal laboratory environments often fail in the Antarctic due to the harsh operating conditions, and field experience is necessary to achieve year-round operation in the 100 W power range. In this paper we present our current power design for the Automatic Geophysical Observatories; a design based on over two decades of experience on the ice and allows for relatively continuous operation at the aforementioned power level. We also discuss our various implementation methods, both failures and successes, in an effort assist other unmanned deployments on the ice.
Melville, R; Stillinger, A; Gerrard, A; Weatherwax, A
2014-04-01
The need to provide power to unmanned instrumentation over the course of an entire year on the Antarctic plateau presents a large number of engineering and logistical challenges. Designs formulated in ideal laboratory environments often fail in the Antarctic due to the harsh operating conditions, and field experience is necessary to achieve year-round operation in the 100 W power range. In this paper we present our current power design for the Automatic Geophysical Observatories; a design based on over two decades of experience on the ice and allows for relatively continuous operation at the aforementioned power level. We also discuss our various implementation methods, both failures and successes, in an effort assist other unmanned deployments on the ice.
Nam, Kyoung Won; Lee, Jung Joo; Hwang, Chang Mo; Choi, Seong Wook; Son, Ho Sung; Sun, Kyung
2007-11-01
Currently, personal mobile communication devices have become quite common, and the applications of such devices have expanded quickly. Remote communication systems might be employed for the telemonitoring of patients or the operating status of their medical devices. In this article, we describe the development of a mobile-based artificial heart telemanagement system for use in a wearable extracorporeal pneumatic biventricular assist device, which is capable of telemonitoring and telecontrolling the operating status of the ventricular assist device from any site. The system developed herein utilized small mobile phones for the client device and adopted a standard transmission control protocol/Internet protocol communication protocol for the purposes of telecommunication. The results of in vitro and animal experiments showed that the telemanagement system developed herein operated in accordance with the desired parameters.
Behavior-based safety on construction sites: a case study.
Choudhry, Rafiq M
2014-09-01
This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.
Predicting the post-operative length of stay for the orthopaedic trauma patient.
Chona, Deepak; Lakomkin, Nikita; Bulka, Catherine; Mousavi, Idine; Kothari, Parth; Dodd, Ashley C; Shen, Michelle S; Obremskey, William T; Sethi, Manish K
2017-05-01
Length of stay (LOS) is a major driver of cost and quality of care. A bundled payment system makes it essential for orthopaedic surgeons to understand factors that increase a patient's LOS. Yet, minimal data regarding predictors of LOS currently exist. Using the ACS-NSQIP database, this is the first study to identify risk factors for increased LOS for orthopaedic trauma patients and create a personalized LOS calculator. All orthopaedic trauma surgery between 2006 and 2013 were identified from the ACS-NSQIP database using CPT codes. Patient demographics, pre-operative comorbidities, anatomic location of injury, and post-operative in-hospital complications were collected. To control for individual patient comorbidities, a negative binomial regression model evaluated hospital LOS after surgery. Betas (β), were determined for each pre-operative patient characteristic. We selected significant predictors of LOS (p < 0.05) using backwards stepwise elimination. 49,778 orthopaedic trauma patients were included in the analysis. Deep incisional surgical site infections and superficial surgical site infections were associated with the greatest percent change in predicted LOS (β = 1.2760 and 1.2473, respectively; p < 0.0001 for both). A post-operative LOS risk calculator was developed based on the formula: [Formula: see text]. Utilizing a large prospective cohort of orthopaedic trauma patients, we created the first personalized LOS calculator based on pre-operative comorbidities, post-operative complications and location of surgery. Future work may assess the use of this calculator and attempt to validate its utility as an accurate model. To improve the quality measures of hospitals, orthopaedists must employ such predictive tools to optimize care and better manage resources.
MailMinder: taming DHCP's mailman interface.
Shultz, E K; Brown, R; Kotta, G
1992-01-01
While the Department of Veteran's Affairs Decentralized Hospital Computer Program (DHCP) is one of the most widely disseminated and successful hospital information systems in existence, it currently is accessed through a user interface which is not as mature as the rest of the system. This interface is a VT-100 compatible, character oriented interface using menus accessed by typed commands for feature access. This project demonstrated that a mature graphical user interface (MailMinder) can be successfully used as a "front-end" to DHCP. MailMinder is completely compatible with the existing unmodified DHCP electronic mail program, Mailman. MailMinder allows the user to be more efficient than the current interface and offers additional features over the current mail system. The program has undergone evaluation and limited deployment at five separate sites. The feature set of this program and its operation will be shown at this demonstration. The demonstration has implications for all current hospital information systems.
MailMinder: taming DHCP's mailman interface.
Shultz, E. K.; Brown, R.; Kotta, G.
1992-01-01
While the Department of Veteran's Affairs Decentralized Hospital Computer Program (DHCP) is one of the most widely disseminated and successful hospital information systems in existence, it currently is accessed through a user interface which is not as mature as the rest of the system. This interface is a VT-100 compatible, character oriented interface using menus accessed by typed commands for feature access. This project demonstrated that a mature graphical user interface (MailMinder) can be successfully used as a "front-end" to DHCP. MailMinder is completely compatible with the existing unmodified DHCP electronic mail program, Mailman. MailMinder allows the user to be more efficient than the current interface and offers additional features over the current mail system. The program has undergone evaluation and limited deployment at five separate sites. The feature set of this program and its operation will be shown at this demonstration. The demonstration has implications for all current hospital information systems. PMID:1482995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2009-01-15
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2009-04-23
Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.« less
Site Characterization at a Tidal Energy Site in the East River, NY (usa)
NASA Astrophysics Data System (ADS)
Gunawan, B.; Neary, V. S.; Colby, J.
2012-12-01
A comprehensive tidal energy site characterization is performed using ADV measurements of instantaneous horizontal current magnitude and direction at the planned hub centerline of a tidal turbine over a two month period, and contributes to the growing data base of tidal energy site hydrodynamic conditions. The temporal variation, mean current statistics, and turbulence of the key tidal hydrodynamic parameters are examined in detail, and compared to estimates from two tidal energy sites in Puget Sound. Tidal hydrodynamic conditions, including mean annual current (at hub height), the speed of extreme gusts (instantaneous horizontal currents acting normal to the rotor plane), and turbulence intensity (as proposed here, relative to a mean current of 2 m s-1) can vary greatly among tidal energy sites. Comparison of hydrodynamic conditions measured in the East River tidal straight in New York City with those reported for two tidal energy sites in Puget Sound indicate differences of mean annual current speeds, difference in the instantaneous current speeds of extreme gusts, and differences in turbulence intensities. Significant differences in these parameters among the tidal energy sites, and with the tidal resource assessment map, highlight the importance of conducting site resource characterization with ADV measurements at the machine scale. As with the wind industry, which adopted an International Electrotechnical Commission (IEC) wind class standard to aid in the selection of wind turbines for a particular site, it is recommended that the tidal energy industry adopt an appropriate standard for tidal current classes. Such a standard requires a comprehensive field campaign at multiple tidal energy sites that can identify the key hydrodynamic parameters for tidal current site classification, select a list of tidal energy sites that exhibit the range of hydrodynamic conditions that will be encountered, and adopt consistent measurement practices (standards) for site classification.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-03-01
This document presents the selected remedial action for the Stationary Low-Power Reactor-1 (SL-1) burial ground, the Boiling Water Reactor Experiment-I (BORAX-I) burial ground, and 10 no action sites in Waste Area Group 5. Actual or threatened releases of hazardous substances from the SL-1 and BORAX-I burial grounds, if not addressed by implementing the response action selected in this Record of Decision, may present a current or potential threat to public health, welfare, or the environment. The 10 no action sites do not present a threat to human health or the environment.
Removal of gadolinium nitrate from heavy water
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilde, E.W.
2000-03-22
Work was conducted to develop a cost-effective process to purify 181 55-gallon drums containing spent heavy water moderator (D2O) contaminated with high concentrations of gadolinium nitrate, a chemical used as a neutron poison during former nuclear reactor operations at the Savannah River Site (SRS). These drums also contain low level radioactive contamination, including tritium, which complicates treatment options. Presently, the drums of degraded moderator are being stored on site. It was suggested that a process utilizing biological mechanisms could potentially lower the total cost of heavy water purification by allowing the use of smaller equipment with less product loss andmore » a reduction in the quantity of secondary waste materials produced by the current baseline process (ion exchange).« less
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
..., LLC, Wafer Slicing and Quality Control Operations, Including On-Site Leased Workers From Brown and... Quality Control Operations, Salem, Oregon, including on-site leased workers from Brown and Dunton, Inc... and included workers who supplied quality control and support functions. The company reports that...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
... Operations, Inc., Including On-Site Leased Workers From Reliable Temp Services, Inc., Johnson & Hill Staffing... Golf Ball Operations, Inc., including on-site leased workers from Reliable Temp Services, Inc., and... Reliable Temp Services, Inc., Johnson & Hill Staffing and Apollo Security, Chicopee, Massachusetts, who...
Preliminary results from comparisons of redundant tiltmeters at three sites in central california
Mortensen, C.E.; Johnston, M.J.S.
1979-01-01
The U.S. Geological Survey has been operating a network of shallow-borehole tiltmeters in central California since June 1973. At six sites redundant instruments have been installed as a check on data coherency. These include the Sage Ranch, Tres Pinos, New Idria, Aromas, Bear Valley and San Juan Bautista tiltmeter sites. Preliminary results from the comparison of redundant data from the Aromas, Bear Valley and San Juan Bautista sites for periods of eight, three and seven months respectively, suggest that short period tilt signals in the range 5 min < T < 3-5 h and ranging in amplitude from 5 ?? 10-8 to 10-6 rad, but not including step offsets, show excellent agreement on closely spaced instruments. Agreement is not as good in this period range for instruments at San Juan Bautista with a separation of 200 m. Signals of interest observed in this period range include coseismic tilts, teleseisms and tilts associated with creep events. Tilt signals in the period range 3-5 h < T < 2- 5 weeks are not always coherent at all three of the redundant tilt sites studied. Tilt signals in this period range have amplitudes up to 5 ?? 10-6 rad and wavelengths down to at least the instrument separation at the closely spaced sites (~several meters). Regarding longerterm coherency, the instruments at San Juan Bautista with 200-m spacing, agree within 0.5 ??rad for the N-S component and 0.7 jurad for the E-W component for a period of two months. The closely spaced redundant instruments at Aromas agree within 2 ??rad for the N-S component and 1 ??rad for the E-W component for the eight-month period of operation. Data from the three sites have been checked for effects of temperature, atmospheric pressure and rainfall. The latter appears to be critically site dependent. The worst case tilts for 1 inch of rainfall can be more than 1 jurad with a duration of a few days to a week. Typical rain-induced tilts are less than 0.3 ??rad for 1 inch of rain. The two instruments at the Sage Ranch site have been in operation for the longest period. However, they have shown local site or ground instability, high drift and lack of coherency since installation. Data are not yet available from the Tres Pinos or New Idria instruments. Deeper installation appears necessary for these instruments and two alternative methods of tiltmeter emplacement are currently being tested in an attempt to evaluate the depth, spatial and temporal dependency of surface tilt sources. ?? 1979.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vucelick, J.; McMichael, G.
2003-11-01
Pacific Northwest National Laboratory evaluated the fish screens at the Nursery Bridge Fishway and the newly constructed Garden City/Lowden II site west of Walla Walla, Washington, in the Walla Walla River Basin during spring and summer 2003. Both fish screen facilities were examined to determine if they were being effectively operated and maintained to provide for safe fish passage. At the Nursery Bridge Fishway, the screens were evaluated specifically to determine whether the louvers that aid in controlling water flow from behind the screens could be adjusted so that the screens would meet fish protection criteria. Data were collected tomore » determine whether velocities in front of the screens and in the bypasses met current National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) (formerly National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage before and after changing the louver settings. Rock weirs downstream of the dam were also evaluated to determine whether they might impede upstream migration of juvenile salmonids during low flow conditions. At the Garden City/Lowden II site, data were collected to establish a baseline for operating conditions and to determine whether any changes in the baffle settings were needed.« less
Jaślan, D; Mueller, T D; Becker, D; Schultz, J; Cuin, T A; Marten, I; Dreyer, I; Schönknecht, G; Hedrich, R
2016-09-01
The two-pore cation channel TPC1 operates as a dimeric channel in animal and plant endomembranes. Each subunit consists of two homologous Shaker-like halves, with 12 transmembrane domains in total (S1-S6, S7-S12). In plants, TPC1 channels reside in the vacuolar membrane, and upon voltage stimulation, give rise to the well-known slow-activating SV currents. Here, we combined bioinformatics, structure modelling, site-directed mutagenesis, and in planta patch clamp studies to elucidate the molecular mechanisms of voltage-dependent channel gating in TPC1 in its native plant background. Structure-function analysis of the Arabidopsis TPC1 channel in planta confirmed that helix S10 operates as the major voltage-sensing site, with Glu450 and Glu478 identified as possible ion-pair partners for voltage-sensing Arg537. The contribution of helix S4 to voltage sensing was found to be negligible. Several conserved negative residues on the luminal site contribute to calcium binding, stabilizing the closed channel. During evolution of plant TPC1s from two separate Shaker-like domains, the voltage-sensing function in the N-terminal Shaker-unit (S1-S4) vanished. © 2016 German Botanical Society and The Royal Botanical Society of the Netherlands.
A Water Cherenkov Detector prototype for the HAWC Gamma-Ray Observatory
NASA Astrophysics Data System (ADS)
Longo, Megan; Mostafa, Miguel; Salesa Greus, Francisco; Warner, David
2011-10-01
A full-size Water Cherenkov Detector (WCD) prototype for the High Altitude Water Cherenkov (HAWC) gamma-ray Observatory was deployed, and is currently being operated at Colorado State University (CSU). The HAWC Observatory will consist of 300 WCDs at the very high altitude (4100m) site in Sierra Negra, Mexico. Each WCD will have 4 baffled upward-facing Photomultiplier Tubes (PMTs) anchored to the bottom of a self made multilayer hermetic plastic bag containing 200,000 liters of purified water, inside a 5m deep by 7.3m diameter steel container. The full size WCD at CSU is the only full size prototype outside of the HAWC site. It is equipped with seven HAWC PMTs and has scintillators both under and above the volume of water. It has been in operation since March 1, 2011. This prototype also has the same laser calibration system that the detectors deployed at the HAWC site will have. The CSU WCD serves as a testbed for the different subsystems before deployment at high altitude, and for optimizing the location of the PMTs, the design of the light collectors, deployment procedures, etc. Simulations of the light inside the detectors and the expected signals in the PMTs can also be benchmarked with this prototype.
Ambient Noise in an Urbanized Tidal Channel
NASA Astrophysics Data System (ADS)
Bassett, Christopher
In coastal environments, when topographic and bathymetric constrictions are combined with large tidal amplitudes, strong currents (> 2 m/s) can occur. Because such environments are relatively rare and difficult to study, until recently, they have received little attention from the scientific community. However, in recent years, interest in developing tidal hydrokinetic power projects in these environments has motivated studies to improve this understanding. In order to support an analysis of the acoustic effects of tidal power generation, a multi-year study was conducted at a proposed project site in Puget Sound (WA) are analyzed at a site where peak currents exceeded 3.5 m/s. From these analyses, three noise sources are shown to dominate the observed variability in ambient noise between 0.02-30 kHz: anthropogenic noise from vessel traffic, sediment-generated noise during periods of strong currents, and flow-noise resulting from turbulence advected over the hydrophones. To assess the contribution of vessel traffic noise, one calendar year of Automatic Identification System (AIS) ship-traffic data was paired with hydrophone recordings. The study region included inland waters of the Salish Sea within a 20 km radius of the hydrophone deployment site in northern Admiralty Inlet. The variability in spectra and hourly, daily, and monthly ambient noise statistics for unweighted broadband and M-weighted sound pressure levels is driven largely by vessel traffic. Within the one-year study period, at least one AIS transmitting vessel is present in the study area 90% of the time and over 1,363 unique vessels are recorded. A noise budget for vessels equipped with AIS transponders identifies cargo ships, tugs, and passenger vessels as the largest contributors to noise levels. A simple model to predict received levels at the site based on an incoherent summation of noise from different vessel types yields a cumulative probability density function of broadband sound pressure levels that shows good agreement with 85% of the temporal data. Bed stresses associated with currents can produce propagating ambient noise by mobilizing sediments. The strength of the tidal currents in northern Admiralty Inlet produces bed stresses in excess of 20 Pa. Significant increases in noise levels at frequencies from 4-30 kHz, with more modest increases noted from 1-4 kHz, are attributed to mobilized sediments. Sediment-generated noise during strong currents masks background noise from other sources, including vessel traffic. Inversions of the acoustic spectra for equivalent grain sizes are consistent with qualitative observations of the seabed composition. Bed stress calculations using log layer, Reynolds stress, and inertial dissipation techniques generally agree well and are used to estimate the shear stresses at which noise levels increase for different grain sizes. Ambient noise levels in one-third octave bands with center frequencies from 1 kHz to 25 kHz are dominated by sediment-generated noise and can be accurately predicted using the near-bed current velocity above a critical threshold. When turbulence is advected over a pressure sensitive transducer, the turbulent pressure fluctuations can be measured as noise, though these pressure fluctuations are not propagating sound and should not be interpreted as ambient noise. Based on measurements in both Admiralty Inlet, Puget Sound and the Chacao Channel, Chile, two models are developed for flow-noise. The first model combined measurements of mean current velocities and turbulence and agrees well with data from both sites. The second model uses scaling arguments to model the flow-noise based solely on the mean current velocity. This model agrees well with the data from the Chacao Channel but performs poorly in Admiralty Inlet, a difference attributed to differences turbulence production mechanisms. At both sites, the spectral slope of flow noise follows a f-3.2 dependence, suggesting partial cancellation of the pressure fluctuations when the turbulent scales are on order of, or smaller than, the characteristic size of the hydrophone. At both sites, flow-noise levels can exceed ambient noise levels during slack currents by more than 50 dB at 20 Hz and flow-noise is measured at frequencies greater than 500 Hz. In Admiralty Inlet, the use of a compact flow shield is shown to reduce flow-noise levels by up to 30 dB. Below 1 kHz, the dominant source of ambient noise is vessel traffic, though during periods of strong currents, the propagating noise from vessels can be difficult to identify because of flow-noise. At frequencies above 1 kHz, during periods of strong currents, the dominant source of ambient noise is bedload transport. Observation of this higher frequency sound is not affected by flow-noise, which is limited to lower frequencies in northern Admiralty Inlet. These results are combined with marine species hearing thresholds, a turbine source spectrum, and a simple propagation model to roughly quantify the probability of marine animals detecting the sound of operating turbines against ambient noise. The results suggest that the likely detection range of operating turbines is limited to less than 1 km under most conditions. The sound produced by operating tidal turbines at the proposed demonstration-scale tidal power project is not likely to have any significant behavioral effect at greater range. Finally, the ambient statistics at the site are also combined with a sound propagation model and vocalization characteristics of Southern Resident killer whales to determine the effective range for passive acoustic monitoring techniques at the proposed project location. Due to the frequency overlap between sediment-generated noise and killer whale vocalizations, during peak currents the detection range for vocalizations is reduced by up to 90% when compared to slack current noise levels. Although the reduction in detection range is significant, this analysis suggests that passive acoustic monitoring will still be effective at ranges greater than the typical range at which killer whales can detect the turbines. These results of these two detection studies will inform the design of post-installation monitoring plans to quantify noise production by operating turbines and the associated environmental changes. This dissertation provides a comprehensive analysis of ambient noise measurements in an energetic coastal environment and advances the understanding of noise sources unique to these environments, such as sediment-generated noise and flow-noise. The improved understanding of these noise sources will aid in the interpretation of acoustic measurements in other energetic environments. Furthermore, as uncertainties in sound produced by tidal turbines and marine animal behavioral responses to this sound are reduced, the foundation laid by this research will allow the acoustic impacts of tidal hydrokinetic power projects to be quantified.
Archaeological field survey automation: concurrent multisensor site mapping and automated analysis
NASA Astrophysics Data System (ADS)
Józefowicz, Mateusz; Sokolov, Oleksandr; Meszyński, Sebastian; Siemińska, Dominika; Kołosowski, Przemysław
2016-04-01
ABM SE develops mobile robots (rovers) used for analog research of Mars exploration missions. The rovers are all-terrain exploration platforms, carrying third-party payloads: scientific instrumentation. "Wisdom" ground penetrating radar for Exomars mission has been tested onboard, as well as electrical resistivity module and other devices. Robot has operated in various environments, such as Central European countryside, Dachstein ice caves or Sahara, Morocco (controlled remotely via satellite from Toruń, Poland. Currently ABM SE works on local and global positioning system for a Mars rover basing on image and IMU data. This is performed under a project from ESA. In the next Mars rover missions a Mars GIS model will be build, including an acquired GPR profile, DEM and regular image data, integrated into a concurrent 3D terrain model. It is proposed to use similar approach in surveys of archaeological sites, especially those, where solid architecture remains can be expected at shallow depths or being partially exposed. It is possible to deploy a rover that will concurrently map a selected site with GPR, 2D and 3D cameras to create a site model. The rover image processing algorithms are capable of automatic tracing of distinctive features (such as exposed structure remains on a desert ground, differences in color of the ground, etc.) and to mark regularities on a created map. It is also possible to correlate the 3D map with an aerial photo taken under any angle to achieve interpretation synergy. Currently the algorithms are an interpretation aid and their results must be confirmed by a human. The advantages of a rover over traditional approaches, such as a manual cart or a drone include: a) long hours of continuous work or work in unfavorable environment, such as high desert, frozen water pools or large areas, b) concurrent multisensory data acquisition, c) working from the ground level enables capturing of sites obstructed from the air (trees), d) it is possible to control the platform from a remote location via satellite, with only servicing person on the site and the survey team operating from their office, globally. The method is under development. The team contributing to the project includes also: Oleksii Sokolov, Michał Koepke, Krzysztof Rydel, Michał Stypczyński, Maciej Ślęk, Łukasz Zapała, Michał Dąbrowski.
NASA Technical Reports Server (NTRS)
Mavroidis, Constantinos; Pfeiffer, Charles; Paljic, Alex; Celestino, James; Lennon, Jamie; Bar-Cohen, Yoseph
2000-01-01
For many years, the robotic community sought to develop robots that can eventually operate autonomously and eliminate the need for human operators. However, there is an increasing realization that there are some tasks that human can perform significantly better but, due to associated hazards, distance, physical limitations and other causes, only robot can be employed to perform these tasks. Remotely performing these types of tasks requires operating robots as human surrogates. While current "hand master" haptic systems are able to reproduce the feeling of rigid objects, they present great difficulties in emulating the feeling of remote/virtual stiffness. In addition, they tend to be heavy, cumbersome and usually they only allow limited operator workspace. In this paper a novel haptic interface is presented to enable human-operators to "feel" and intuitively mirror the stiffness/forces at remote/virtual sites enabling control of robots as human-surrogates. This haptic interface is intended to provide human operators intuitive feeling of the stiffness and forces at remote or virtual sites in support of space robots performing dexterous manipulation tasks (such as operating a wrench or a drill). Remote applications are referred to the control of actual robots whereas virtual applications are referred to simulated operations. The developed haptic interface will be applicable to IVA operated robotic EVA tasks to enhance human performance, extend crew capability and assure crew safety. The electrically controlled stiffness is obtained using constrained ElectroRheological Fluids (ERF), which changes its viscosity under electrical stimulation. Forces applied at the robot end-effector due to a compliant environment will be reflected to the user using this ERF device where a change in the system viscosity will occur proportionally to the force to be transmitted. In this paper, we will present the results of our modeling, simulation, and initial testing of such an electrorheological fluid (ERF) based haptic device.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lahs, W.R.; Haisfield, M.F.
1991-12-31
Since the 1982 promulgation of regulations for the land disposal of low-level radioactive waste (LLW), requirements have been in place to control transfers of LLW intended for disposal at licensed land disposal facilities. These requirements established a manifest tracking system and defined processes to control transfers of LLW intended for disposal at a land disposal facility. Because the regulations did not specify the format for the LLW shipment manifests, it was not unexpected that the two operators of the three currently operating disposal sites should each have developed their own manifest forms. The forms have many similarities and the collectedmore » information, in many cases, is identical; however, these manifests incorporate unique operator preferences and also reflect the needs of the Agreement State regulatory authority in the States where the disposal sites are located. Since Agreement State regulations must be compatible with, but need not always be identical to, those of the Nuclear Regulatory Commission (NRC), the possibility of a proliferation of different manifest forms containing variations in collected information could be envisioned. If these manifests were also to serve a shipping paper purpose, effective integration of the Department of Transportations` (DOT) requirements would also have to be addressed. This wide diversity in uses of manifest information by Federal and State regulatory authorities, other State or Compact entities, and disposal site operators, suggested a single consolidated approach to develop a uniform manifest format with a baseline information content and to define recordkeeping requirements. The NRC, in 1989, had embarked on a rulemaking activity to establish a base set of manifest information needs for regulatory purposes. In response to requests from State and Regional Compact organizations who are attempting to design, develop and operate LLW disposal facilities, and with the general support of Agreement State regulatory authorities, this original data base rulemaking was expanded to include development of a uniform low-level radioactive waste manifest.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cossairt, J.Donald; /Fermilab
2010-12-01
Preliminary plans for providing the proton beam needed by the proposed Mu2e experiment at Fermilab will require the transport of 8 GeV protons to the Accumulator/Debuncher where they be processed into an intensity and time structure useful for the experiment. The intensities involved are far greater that those encountered with antiprotons of the same kinetic energy in the same beam enclosures under Tevatron Collider operational conditions, the operating parameters for which the physical facilities of the Antiproton Source were designed. This note explores some important ramifications of the proposed operation for radiation safety and demonstrates the need for extensive modificationsmore » of significant portions of the shielding of the Accumulator Debuncher storage rings; notably that underneath the AP Service Buildings AP10, AP30, and AP50. While existing shielding is adequate for the current operating mode of the Accumulator/Debuncher as part of the Antiproton Source used in the Tevatron Collider program, without significant modifications of the shielding configuration in the Accumulator/Debuncher region and/or beam loss control systems far more effective than seen in most applications at Fermilab, the proposed operational mode for Mu2e is not viable for the following reasons: 1. Due to skyshine alone, under normal operational conditions large areas of the Fermilab site would be exposed to unacceptable levels of radiation where most of the Laboratory workforce and some members of the general public who regularly visit Fermilab would receive measurable doses annually, contrary to workforce, public, and DOE expectations concerning the As Low as Reasonably Achievable (ALARA) principle. 2. Under normal operational conditions, a sizeable region of the Fermilab site would also require fencing due to skyshine. The size of the areas involved would likely invite public inquiry about the significant and visible enlargement of Fermilab's posted radiological areas. 3. There would be aesthetics questions about the employment of so much new fencing on the Fermilab site. 4. The assumption of only 1.0% 'normal condition' beam losses over the three locations is regarded as being extremely optimistic. Thus, it is evident that it is necessary to pursue shielding improvements to support viable operation of the Mu2e experiment.« less
Characterization of Tactical Departure Scheduling in the National Airspace System
NASA Technical Reports Server (NTRS)
Capps, Alan; Engelland, Shawn A.
2011-01-01
This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.
NASA Astrophysics Data System (ADS)
Adler, J.; Goulden, T.; Kampe, T. U.; Leisso, N.; Musinsky, J.
2014-12-01
The National Ecological Observatory Network (NEON) has collected airborne photographic, lidar, and imaging spectrometer data in 5 of 20 unique ecological climate regions (domains) within the United States. As part of its mission to detect and forecast ecological change at continental scales over multiple decades, NEON Airborne Observation Platform (AOP) will aerially survey the entire network of 60 core and re-locatable terrestrial sites annually, each of which are a minimum of 10km-by-10km in extent. The current effort encompasses three years of AOP engineering test flights; in 2017 NEON will transition to full operational status in all 20 domains. To date the total airborne data collected spans 34 Terabytes, and three of the five sampled domain's L1 data are publically available upon request. The large volume of current data, and the expected data collection over the remaining 15 domains, is challenging NEON's data distribution plans, backup capability, and data discovery processes. To provide the public with the highest quality data, calibration and validation efforts of the camera, lidar, and spectrometer L0 data are implemented to produce L1 datasets. Where available, the collected airborne measurements are validated against ground reference points and surfaces and adjusted for instrumentation and atmospheric effects. The imaging spectrometer data is spectrally and radiometrically corrected using NIST-traceable procedures. This presentation highlights three years of flight operation experiences including:1) Lessons learned on payload re-configuration, data extraction, data distribution, permitting requirements, flight planning, and operational procedures2) Lidar validation through control data comparisons collected at the Boulder Municipal Airport (KBDU), the site of NEON's new hangar facility3) Spectrometer calibration efforts, to include both the laboratory and ground observations
Matthieu, D.E.; Brusseau, M.L.; Guo, Z.; Plaschke, M.; Carroll, K.C.; Brinker, F.
2015-01-01
The objective of this study was to characterize the behavior of a groundwater contaminant (trichloroethene) plume after implementation of a source-containment operation at a site in Arizona. The plume resides in a quasi three-layer system comprising a sand/gravel unit bounded on the top and bottom by relatively thick silty clayey layers. The system was monitored for 60 months beginning at start-up in 2007 to measure the change in contaminant concentrations within the plume, the change in plume area, the mass of contaminant removed, and the integrated contaminant mass discharge. Concentrations of trichloroethene in groundwater pumped from the plume extraction wells have declined significantly over the course of operation, as have concentrations for groundwater sampled from 40 monitoring wells located within the plume. The total contaminant mass discharge associated with operation of the plume extraction wells peaked at 0.23 kg/d, decreased significantly within one year, and thereafter began an asymptotic decline to a current value of approximately 0.03 kg/d. Despite an 87% reduction in contaminant mass and a comparable 87% reduction in contaminant mass discharge for the plume, the spatial area encompassed by the plume has decreased by only approximately 50%. This is much less than would be anticipated based on ideal flushing and mass-removal behavior. Simulations produced with a simplified 3-D numerical model matched reasonably well to the measured data. The results of the study suggest that permeability heterogeneity, back diffusion, hydraulic factors associated with the specific well field system, and residual discharge from the source zone are all contributing to the observed persistence of the plume, as well as the asymptotic behavior currently observed for mass removal and for the reduction in contaminant mass discharge. PMID:26069436
Design Considerations: Falcon M Dwarf Habitable Exoplanet Survey
NASA Astrophysics Data System (ADS)
Polsgrove, Daniel; Novotny, Steven; Della-Rose, Devin J.; Chun, Francis; Tippets, Roger; O'Shea, Patrick; Miller, Matthew
2016-01-01
The Falcon Telescope Network (FTN) is an assemblage of twelve automated 20-inch telescopes positioned around the globe, controlled from the Cadet Space Operations Center (CSOC) at the US Air Force Academy (USAFA) in Colorado Springs, Colorado. Five of the 12 sites are currently installed, with full operational capability expected by the end of 2016. Though optimized for studying near-earth objects to accomplish its primary mission of Space Situational Awareness (SSA), the Falcon telescopes are in many ways similar to those used by ongoing and planned exoplanet transit surveys targeting individual M dwarf stars (e.g., MEarth, APACHE, SPECULOOS). The network's worldwide geographic distribution provides additional potential advantages. We have performed analytical and empirical studies exploring the viability of employing the FTN for a future survey of nearby late-type M dwarfs tailored to detect transits of 1-2REarth exoplanets in habitable-zone orbits . We present empirical results on photometric precision derived from data collected with multiple Falcon telescopes on a set of nearby (< 25 pc) M dwarfs using infrared filters and a range of exposure times, as well as sample light curves created from images gathered during known transits of varying transit depths. An investigation of survey design parameters is also described, including an analysis of site-specific weather data, anticipated telescope time allocation and the percentage of nearby M dwarfs with sufficient check stars within the Falcons' 11' x 11' field-of-view required to perform effective differential photometry. The results of this ongoing effort will inform the likelihood of discovering one (or more) habitable-zone exoplanets given current occurrence rate estimates over a nominal five-year campaign, and will dictate specific survey design features in preparation for initiating project execution when the FTN begins full-scale automated operations.
Site environmental report for 2009 : Sandia National Laboratories, California.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
2010-06-01
Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office oversees operations at the site, using Sandia Corporation as a management and operating contractor. This Site Environmental Report for 2009 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2009. General site and environmental program information is also included. The Site Environmental Report is divided into tenmore » chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2009. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2009. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.« less
Tracking strategies for laser ranging to multiple satellite targets
NASA Technical Reports Server (NTRS)
Robbins, J. W.; Smith, D. E.; Kolenkiewicz, R.
1994-01-01
By the middle of the decade, several new Laser Geodynamic Satellites will be launched to join the current constellation comprised of the laser geodynamic satellite (LAGEOS) (US), Starlette (France), Ajisai (Japan), and Etalon I and II (USSR). The satellites to be launched, LAGEOS II and III (US & Italy), and Stella (France), will be injected into orbits that differ from the existing constellation so that geodetic and gravimetric quantities are sampled to enhance their resolution and accuracy. An examination of various possible tracking strategies adopted by the network of laser tracking stations has revealed that the recovery of precise geodetic parameters can be obtained over shorter intervals than is currently obtainable with the present constellation of satellites. This is particularly important in the planning of mobile laser tracking operations, given a network of permanently operating tracking sites. Through simulations, it is shown that laser tracking of certain satellite passes, pre-selected to provide optimal sky-coverage, provides the means to acquire a sufficient amount of data to allow the recovery of 1 cm station positions.
Investigating the Effects of Variable Water Type for VIIRS Calibration
NASA Astrophysics Data System (ADS)
Bowers, J.; Ladner, S.; Martinolich, P.; Arnone, R.; Lawson, A.; Crout, R. L.; Vandermeulen, R. A.
2016-02-01
The Naval Research Laboratory - Stennis Space Center (NRL-SSC) currently provides calibration and validation support for the Visible Infrared Imaging Radiometer Suite (VIIRS) satellite ocean color products. NRL-SSC utilizes the NASA Ocean Biology Processing Group (OBPG) methodology for on-orbit vicarious calibration with in situ data collected in blue ocean water by the Marine Optical Buoy (MOBY). An acceptable calibration consists of 20-40 satellite to in situ matchups that establish the radiance correlation at specific points within the operating range of the VIIRS instrument. While the current method improves the VIIRS performance, the MOBY data alone does not represent the full range of radiance values seen in the coastal oceans. However, by utilizing data from the AERONET-OC coastal sites we expand our calibration matchups to cover a more realistic range of continuous values particularly in the green and red spectral regions of the sensor. Improved calibration will provide more accurate data to support daily operations and enable construction of valid climatology for future reference.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limitations must I meet if I own or operate a stationary RICE with a site rating of more than 500... RICE with a site rating of more than 500 brake HP located at a major source of HAP emissions... 4SRB stationary RICE with a site rating of more than 500 brake HP located at a major source of HAP...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating limitations must I meet if I own or operate a stationary RICE with a site rating of more than 500... RICE with a site rating of more than 500 brake HP located at a major source of HAP emissions... 4SRB stationary RICE with a site rating of more than 500 brake HP located at a major source of HAP...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less
The economics and timing of preoperative antibiotics for orthopaedic procedures.
Norman, B A; Bartsch, S M; Duggan, A P; Rodrigues, M B; Stuckey, D R; Chen, A F; Lee, B Y
2013-12-01
The efficacy of antibiotics in preventing surgical site infections (SSIs) depends on the timing of administration relative to the start of surgery. However, currently, both the timing of and recommendations for administration vary substantially. To determine how the economic value from the hospital perspective of preoperative antibiotics varies with the timing of administration for orthopaedic procedures. Computational decision and operational models were developed from the hospital perspective. Baseline analyses looked at current timing of administration, while additional analyses varied the timing of administration, compliance with recommended guidelines, and the goal time-interval. Beginning antibiotic administration within 0-30 min prior to surgery resulted in the lowest costs and SSIs. Operationally, linking to a pre-surgical activity, administering antibiotics prior to incision but after anaesthesia-ready time was optimal, as 92.1% of the time, antibiotics were administered in the optimal time-interval (0-30 min prior to incision). Improving administration compliance from 80% to 90% for this pre-surgical activity results in cost savings of $447 per year for a hospital performing 100 orthopaedic operations a year. This study quantifies the potential cost-savings when antibiotic administration timing is improved, which in turn can guide the amount hospitals should invest to address this issue.
Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrecky, James; Ashley, Christopher
2014-07-21
Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuelmore » cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.« less
Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stevens, Patrice Ann; Baumer, Andrew Ronald
Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste managementmore » and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste management units at Area G. These MDA G disposal units include 32 pits, 193 shafts, and 4 trenches and contain LLW, MLLW and TRU waste. The remaining 105 solid waste management units (SWMUs) include RCRA-regulated landfill and storage units and DOE-regulated LLW disposal units. The TA-54 closure project must ensure that continuing waste operations at Area G and their transition to an interim or enduring facility are coordinated with closure activities.« less
Robots and Humans in Planetary Exploration: Working Together?
NASA Technical Reports Server (NTRS)
Landis, Geoffrey A.; Lyons, Valerie (Technical Monitor)
2002-01-01
Today's approach to human-robotic cooperation in planetary exploration focuses on using robotic probes as precursors to human exploration. A large portion of current NASA planetary surface exploration is focussed on Mars, and robotic probes are seen as precursors to human exploration in: Learning about operation and mobility on Mars; Learning about the environment of Mars; Mapping the planet and selecting landing sites for human mission; Demonstration of critical technology; Manufacture fuel before human presence, and emplace elements of human-support infrastructure
2013-02-01
author(s) and should not be construed as an official Department of the Army position, policy or decision unless so designated by other documentation. 1...Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that...required, WRNMMC credentialing office will NOT renew privileges unless a peer review can be conducted. However, as it currently stands, peer review
Large Horizontal-Axis Wind Turbines
NASA Technical Reports Server (NTRS)
Thresher, R. W. (Editor)
1982-01-01
The proceedings of a workshop held in Cleveland, July 28-30, 1981 are described. The workshop emphasized recent experience in building and testing large propeller-type wind turbines, expanding upon the proceedings of three previous DOE/NASA workshops at which design and analysis topics were considered. A total of 41 papers were presented on the following subjects: current and advanced large wind turbine systems, rotor blade design and manufacture, electric utility activities, research and supporting technology, meteorological characteristics for design and operation, and wind resources assessments for siting.
NASA Technical Reports Server (NTRS)
Putkovich, K.
1981-01-01
Initial test results indicated that the Global Positioning System/Time Transfer Unit (GPS/TTU) performed well within the + or - 100 nanosecond range required by the original system specification. Subsequent testing involved the verification of GPS time at the master control site via portable clocks and the acquisition and tracking of as many passes of the space vehicles currently in operation as possible. A description and discussion of the testing, system modifications, test results obtained, and an evaluation of both GPS and the GPS/TTU are presented.
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Jack Pfaller
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Kim Shiflett
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Jack Pfaller
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Jack Pfaller
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Kim Shiflett
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Jack Pfaller
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Jack Pfaller
2011-04-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, smoke rises from a smoldering brush fire southeast of the Turn Basin. The fire was spotted near Kennedy’s Press Site approximately three miles away from Launch Pad 39A. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service. No personnel are in danger and currently there is no to impact any operations related to space shuttle Endeavour’s launch countdown. Photo credit: NASA/Troy Cryder
NASA Astrophysics Data System (ADS)
Baars, Holger; Althausen, Dietrich; Engelmann, Ronny; Heese, Birgit; Ansmann, Albert; Wandinger, Ulla; Hofer, Julian; Skupin, Annett; Komppula, Mika; Giannakaki, Eleni; Filioglou, Maria; Bortoli, Daniele; Silva, Ana Maria; Pereira, Sergio; Stachlewska, Iwona S.; Kumala, Wojciech; Szczepanik, Dominika; Amiridis, Vassilis; Marinou, Eleni; Kottas, Michail; Mattis, Ina; Müller, Gerhard
2018-04-01
PollyNET is a network of portable, automated, and continuously measuring Ramanpolarization lidars of type Polly operated by several institutes worldwide. The data from permanent and temporary measurements sites are automatically processed in terms of optical aerosol profiles and displayed in near-real time at polly.tropos.de. According to current schedules, the network will grow by 3-4 systems during the upcoming 2-3 years and will then comprise 11 permanent stations and 2 mobile platforms.
NASA Astrophysics Data System (ADS)
Zwaan, M.; Testi, L.
The Atacama Large Millimeter/submillimeter Array (ALMA) is currently being constructed at the 5000m Chajnantor plateau in the Chilean Andes. ALMA has been designed and is being built to deliver transformational science in the millimeter and submillimeter regime for many years to come. We briefly describe the project status and timeline. The Atacama Pathfinder Experiment (APEX), built at the same site, is already operational and proves to be an effective survey instrument. We discuss which niches in millimeter/submillimeter astronomy will remain open for a possible facility in Antarctica.
2009-01-01
The Cytochrome P450 Homepage is a universal resource for nomenclature and sequence information on cytochrome P450 (CYP) genes. The site has been in continuous operation since February 1995. Currently, naming information for 11,512 CYPs are available on the web pages. The P450 sequences are manually curated by David Nelson, and the nomenclature system conforms to an evolutionary scheme such that members of CYP families and subfamilies share common ancestors. The organisation and content of the Homepage are described. PMID:19951895
Improvements to GOES Twilight Cloud Detection over the ARM SGP
NASA Technical Reports Server (NTRS)
Yost, c. R.; Trepte, Q.; Khaiyer, M. M.; Palikonda, R.; Nguyen, L.
2007-01-01
The current ARM satellite cloud products derived from Geostationary Operational Environmental Satellite (GOES) data provide continuous coverage of many cloud properties over the ARM Southern Great Plains domain. However, discontinuities occur during daylight near the terminator, a time period referred to here as twilight. This poster presentation will demonstrate the improvements in cloud detection provided by the improved cloud mask algorithm as well as validation of retrieved cloud properties using surface observations from the Atmospheric Radiation Measurement Southern Great Plains (ARM SGP) site.
Reichelt-Brushett, Amanda J; Stone, Jane; Howe, Pelli; Thomas, Bernard; Clark, Malcolm; Male, Yusthinus; Nanlohy, Albert; Butcher, Paul
2017-01-01
Artisanal small-scale gold mining (ASGM) using mercury (Hg) amalgamation has been occurring on Buru Island, Indonesia since early 2012, and has caused rapid accumulation of high Hg concentrations in river, estuary and marine sediments. In this study, sediment samples were collected from several sites downstream of the Mount Botak ASGM site, as well as in the vicinity of the more recently established site at Gogrea where no sampling had previously been completed. All sediment samples had total Hg (THg) concentrations exceeding Indonesian sediment quality guidelines and were up to 82 times this limit at one estuary site. The geochemistry of sediments in receiving environments indicates the potential for Hg-methylation to form highly bioavailable Hg species. To assess the current contamination threat from consumption of local seafood, samples of fish, molluscs and crustaceans were collected from the Namlea fish market and analysed for THg concentrations. The majority of edible tissue samples had elevated THg concentrations, which raises concerns for food safety. This study shows that river, estuary and marine ecosystems downstream of ASGM operations on Buru Island are exposed to dangerously high Hg concentrations, which are impacting aquatic food chains, and fisheries resources. Considering the high dietary dependence on marine protein in the associated community and across the Mollucas Province, and the short time period since ASGM operations commenced in this region, the results warrant urgent further investigation, risk mitigation, and community education. Copyright © 2016 Elsevier Inc. All rights reserved.
Results from Two Years of Ka-Band Propagation Characterization at Svalbard, Norway
NASA Technical Reports Server (NTRS)
Nessel, James A.; Morse, Jacquelynne Rose; Zemba, Michael
2014-01-01
Over the several years, NASA plans to launch several earth science missions which are expected to achieve data throughputs of 5-40 terabits per day transmitted from low earth orbiting spacecraft to ground stations. The current S-band and X-band frequency allocations in use by NASA, however, are incapable of supporting the data rates required to meet this demand. As such, NASA is in the planning stages to upgrade its existing Near Earth Network (NEN) Polar ground stations to support Ka-band (25.5-27 GHz) operations. Consequently, it becomes imperative that characterization of propagation effects at these NEN sites is conducted to determine expected system performance, particularly at low elevation angles ((is) less than 10 deg) where spacecraft signal acquisition typically occurs. Since May 2011, NASA Glenn Research Center has installed and operated a Ka-band radiometer at the NEN site located in Svalbard, Norway. The Ka-band radiometer monitors the water vapor line, as well as 6 frequencies around 26.5 GHz at multiple elevation angles: 45 deg, 20 deg, and 10 deg. Two year data collection results indicate comparable performance to previously characterized northern latitude sites in the United States, i.e., Fairbanks, Alaska. It is observed that cloud cover at the Svalbard site remains the dominant loss mechanism for Ka-band links, resulting in a margin requirement of 4.1 dB to maintain link availability of 99% at 10 deg elevation.
Immediate Partial Breast Reconstruction with Endoscopic Latissimus Dorsi Muscle Flap Harvest
Yang, Chae Eun; Roh, Tai Suk; Yun, In Sik; Lew, Dae Hyun
2014-01-01
Background Currently, breast conservation therapy is commonly performed for the treatment of early breast cancer. Depending on the volume excised, patients may require volume replacement, even in cases of partial mastectomy. The use of the latissimus dorsi muscle is the standard method, but this procedure leaves an unfavorable scar on the donor site. We used an endoscope for latissimus dorsi harvesting to minimize the incision, thus reducing postoperative scars. Methods Ten patients who underwent partial mastectomy and immediate partial breast reconstruction with endoscopic latissimus dorsi muscle flap harvest were reviewed retrospectively. The total operation time, hospital stay, and complications were reviewed. Postoperative scarring, overall shape of the reconstructed breast, and donor site deformity were assessed using a 10-point scale. Results In the mean follow-up of 11 weeks, no tumor recurrence was reported. The mean operation time was 294.5 (±38.2) minutes. The postoperative hospital stay was 11.4 days. Donor site seroma was reported in four cases and managed by office aspiration and compressive dressing. Postoperative scarring, donor site deformity, and the overall shape of the neobreast were acceptable, scoring above 7. Conclusions Replacement of 20% to 40% of breast volume in the upper and the lower outer quadrants with a latissimus dorsi muscle flap by using endoscopic harvesting is a good alternative reconstruction technique after partial mastectomy. Short incision benefits from a very acceptable postoperative scar, less pain, and early upper extremity movement. PMID:25276643
Overview of environmental investigations and remediations of leaks and spills in oil and gas fields
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacobs, J.A.; Jacobs, O.T.; Traver, R.
Historic and current leaks and spills in oil and gas fields can involve a variety of hazardous compounds, can be located virtually anywhere on site, and may significantly degrade soils and groundwater quality. Environmental evaluation of historic and current leaks and spills in oil and gas fields occurs in the investigative stage, characterized by a site assessment and field evaluation. The site assessment includes a site survey, aerial photo interpretation, review of regulatory agency records, operators' records, previous work by consultants, and interviews with knowledgeable persons. The field evaluation, designed to examine the lateral and vertical extent of the spillmore » or leak, could include a soil gas survey, cone penetrometer, trenching, and drilling. Using these techniques, collected soil or groundwater samples can be analyzed in a laboratory to differentiate the various hazardous compounds on-site. Once an environmental investigation has been performed to define the vertical and lateral extent of a spill and the potential pathways that the hazardous compound will move to expose a given population, then remediation options can be designed. Remedial programs for hazardous compounds commonly found in oil and gas fields include the following in-situ technologies: volatilization, biodegradation, leaching and chemical reaction, vitrification, passive remediation, and isolation/containment. Non-in-situ technologies include land farming, incineration, asphalt incorporation, solidification/stabilization, groundwater extraction and treatment, chemical extraction, and excavation and offsite disposal. Factors affecting remedial measures are cost of technology, time available to finish remediation, technical feasibility, regulatory acceptance, and accessibility and availability of space in the remediation area.« less
Mesophotic coral ecosystems under anthropogenic stress: a case study at Ponce, Puerto Rico
NASA Astrophysics Data System (ADS)
Appeldoorn, Richard; Ballantine, David; Bejarano, Ivonne; Carlo, Milton; Nemeth, Michael; Otero, Ernesto; Pagan, Francisco; Ruiz, Hector; Schizas, Nikolaos; Sherman, Clark; Weil, Ernesto
2016-03-01
Mesophotic coral ecosystems (MCEs) were compared between La Parguera and Ponce, off the south coast of Puerto Rico. In contrast to La Parguera, Ponce has a narrow insular shelf and hosts several river outlets, a commercial port, a regional sewage treatment plant with associated deep water outfall, and three deep dredge disposal sites. Off Ponce, MCEs receive higher (16×) rates of sedimentation than off La Parguera, a less impacted site. The most impacted sites were located offshore of Cayo Ratones and are in or down-current and in close proximity to one of the dredge disposal sites. There, MCEs are characterized by a steep, irregular, rocky slope with a cover of fine-grained, dark brown sediment, which increases with depth. At shallower depths, scattered rocky outcroppings are colonized by sponges, black corals and algae. The sediment cover contains two to three times the terrigenous content and a significantly higher percentage of the fine-grained fraction than off La Parguera. Thirteen remotely operated vehicle (ROV) dives east and west of Ponce showed that the deepest depth at which corals were observed increased with distance from Cayo Ratones and did not approach depths observed off La Parguera except at the eastern-most (up-current) site, Caja de Muertos, which was also significantly further offshore. Benthic communities off Caja de Muertos were comparable to those at La Parguera, while off Cayo Ratones, there were no mesophotic corals and sparse development of other benthic macrobiota except sponges. Management authorities should include MCEs when assessing potential impacts from anthropogenic activities and take the necessary steps to reduce local threats.
Data Collection and Validation of Newport Beach Hydrogen Station Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kashuba, Michael John
2012-10-15
The hydrogen fueling station located at 1600 Jamboree Road in Newport Beach, California was designed and built to refuel light duty fuel cell electric vehicles (FCEVs). The station features the on-site generation of hydrogen through a small scale natural gas steam methane reformer (SMR). All the hydrogen related equipment was added to an existing retail gasoline/diesel station. The station is an early demonstration of what the footprint and equipment arrangement of a retail on-site SMR facility might look like. Commercial customer FCEV leases have only just begun in the last two years or so. And, individual Original Equipment Manufacturer (OEM)more » vehicle lease fleets are relatively small. Only a few hundred FCEVs are on the road in California. As a result, hydrogen throughput is relatively low at the few early pre-commercial hydrogen stations that are currently open. Therefore the stations are underutilized. This project aims to collect additional station data to allow the operator to potentially adjust various operational parameters in order to improve the overall efficiency of the station and lower operation and maintenance costs and to help improve air quality and reduce greenhouse gas emissions. Due to unforeseen delays, technical challenges and personnel reassignments the project was delayed to the point that the award was allowed to expire.« less
Responding to traveling patients' seasonal demand for health care services.
Al-Haque, Shahed; Ceyhan, Mehmet Erkan; Chan, Stephanie H; Nightingale, Deborah J
2015-01-01
The Veterans Health Administration (VHA) provides care to over 8 million Veterans and operates over 1,700 sites of care across 21 regional networks in the United States. Health care providers within VHA report large seasonal variation in the demand for services, especially in the southern United States because of arrival of "snowbirds" during the winter. Because resource allocation activities are primarily carried out through an annual budgeting process, the seasonal load imposed by "traveling Veterans"-Veterans that seek care at VHA sites outside of their home network-make providing high-quality services more challenging. This work constitutes the first major effort within VHA to understand the impact of traveling Veterans. We discovered strong seasonal fluctuations in demand at a clinic located in the southeastern United States and developed a seasonal autoregressive integrated moving average model to help the clinic forecast demand for its services with significantly less error than historical averaging. Monte Carlo simulation of the clinic revealed that physicians are overutilized, suggesting the need to re-evaluate how the clinic is currently staffed. More broadly, this study demonstrates how operations management methods can assist operational decision making at other clinics and medical centers both within and outside VHA. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.
Dravolina, O A; Zvartau, E E; Bespalov, A Y
2000-04-01
Current perspectives on the clinical use of NMDA receptor antagonists infer repeated administration schedules for the management of different pathological states. The development of tolerance and cross-tolerance between different NMDA receptor antagonists may be an important factor contributing to the clinical efficacy of these drugs. The present study aimed to characterize the development of tolerance and cross-tolerance to the ability of various site-selective NMDA receptor antagonists to produce a decrement of operant responding (multiple extinction 9 s fixed-interval 1-s schedule of water reinforcement). Acute administration of D-CPPen (SDZ EAA 494; 1-5.6 mg/kg), dizocilpine (MK-801; 0.03-0.3 mg/kg), memantine (0.3-17 mg/kg), ACEA-1021 (10-56 mg/kg), and eliprodil (1-30 mg/kg) differentially affected operant responding. Both increases and decreases in response rates and accuracy of responding were observed. Repeated preexposure to D-CPPen (5.6 mg/kg, once a day for 7 days) attenuated a behavioral disruption produced by an acute challenge with D-CPPen or ACEA-1021, but potentiated the effects of dizocilpine, memantine, and eliprodil. Based on the present results, one can suggest that the repeated administration of a competitive NMDA receptor antagonist differentially affects the functional activity of various sites on NMDA receptor complex.
Heitmann, Stewart; Rule, Michael; Truccolo, Wilson; Ermentrout, Bard
2017-01-01
Constant optogenetic stimulation targeting both pyramidal cells and inhibitory interneurons has recently been shown to elicit propagating waves of gamma-band (40-80 Hz) oscillations in the local field potential of non-human primate motor cortex. The oscillations emerge with non-zero frequency and small amplitude-the hallmark of a type II excitable medium-yet they also propagate far beyond the stimulation site in the manner of a type I excitable medium. How can neural tissue exhibit both type I and type II excitability? We investigated the apparent contradiction by modeling the cortex as a Wilson-Cowan neural field in which optogenetic stimulation was represented by an external current source. In the absence of any external current, the model operated as a type I excitable medium that supported propagating waves of gamma oscillations similar to those observed in vivo. Applying an external current to the population of inhibitory neurons transformed the model into a type II excitable medium. The findings suggest that cortical tissue normally operates as a type I excitable medium but it is locally transformed into a type II medium by optogenetic stimulation which predominantly targets inhibitory neurons. The proposed mechanism accounts for the graded emergence of gamma oscillations at the stimulation site while retaining propagating waves of gamma oscillations in the non-stimulated tissue. It also predicts that gamma waves can be emitted on every second cycle of a 100 Hz oscillation. That prediction was subsequently confirmed by re-analysis of the neurophysiological data. The model thus offers a theoretical account of how optogenetic stimulation alters the excitability of cortical neural fields.
Defense.gov - Special Report: Marine Assault: Operation Cobra's Anger
Operation Cobra's Anger. Story Marines Clear Taliban Stronghold During Operation Cobra's Anger HELMAND -scale operation in northern Helmand province. Story Related Sites Marine Corps News White House Fact insurgents Operation Cobra's Anger PHOTOS About This Site DoD Inspector General Freedom of Information
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
40 CFR 63.7733 - What procedures must I use to establish operating limits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Foundries Initial Compliance Requirements § 63.7733 What procedures must I use to establish operating limits... site-specific operating limits in your operation and maintenance plan according to the procedures in... site-specific operating limit according to the procedures specified in paragraphs (c)(1) and (2) of...
Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowe, John; Aly, Alaa
2012-07-01
The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and tomore » evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides; these radionuclides either would have decayed and would be undetectable in soil, or likely would not have deposited onto Hanford Site soils. A small fraction of the total historical emissions consisted of long-lived particulate radionuclides, which could have deposited onto the soil. Soil monitoring studies conducted as part of surveillance and monitoring programs do not indicate a build-up of radionuclide concentrations in soil, which might indicate potential deposition impacts from stack emissions. Aerial radiological surveys of the Hanford Site, while effective in detecting gamma-emitting nuclides, also do not indicate deposition patterns in soil from stack emissions. - The surveillance and monitoring programs also have verified that the limited occurrence of biointrusion observed in the River Corridor has not resulted in a spread of contamination into the non-operational areas. - Monitoring of radionuclides in ambient air conducted as part of the surveillance and monitoring programs generally show a low and declining trend of detected concentrations in air. Monitoring of radionuclides in soil and vegetation correspondingly show declining trends in concentrations, particularly for nuclides with short half lives (Cs-137, Co-60 and Sr-90). - Statistical analysis of the geographical distribution of waste sites based on man -made features and topography describes the likely locations of waste sites in the River Corridor. The results from this analysis reinforce the findings from the Orphan Site Evaluation program, which has systematically identified any remaining waste sites within the River Corridor. - Statistical analysis of the distribution of radionuclide concentrations observable from aerial surveys has confirmed that the likelihood of detecting elevated radionuclide concentrations in non-operational area soils is very small; the occurrences and locations where potentially elevated concentrations may be found are discussed below. In addition, statistical analysis showed that there is a relatively high probability (>50%) that concentrations of Cs-137 higher than background (3.9 Bq/kg or 1.05 pCi/g) are located outside of the operational portion of the 100-BC, 100-K, and 100-N Areas. This observation is based on modeled concentrations in soil derived from aerial radiography data. However, the extent is limited to a few meters from the respective facilities fence lines or known operational activities. Evaluation of the extent of contamination is being conducted as part of the RI process for each decision area. No unanticipated waste sites were identified either from the OSE program or statistical analysis of waste site proximity to known features. Based on the evaluation of these multiple lines of evidence, the likelihood of identifying waste sites or contaminant dispersal from Hanford site operations into non-operational areas can be considered very small. (authors)« less
NoWMex: Continuous GNSS Sites in Northwest Mexico
NASA Astrophysics Data System (ADS)
Gonzalez-Garcia, J. J.; Gonzalez-Ortega, J. A.
2008-05-01
Nowadays GPS has become part of daily life activities. In the near future, with the GPS modernization and the use of Glonass and Galileo as a Global Navigation Satellite System will give relative location precision from decimeters to millimeters in near real time applications. In order to realize this, we need a global array of continuously operating GNSS stations built to meet the standards of the geophysical communities and linked with gravimetric local measurements to discern the vertical component of our active Earth. Trying to follow this revolution, CICESE has been working with GPS since 1985. The GPS site CICE was built as an IGS reference station in 1995. Afterward we built 5 more continuous GPS sites in Northwest Mexico with the support of SCIGN. The CGPS NoWMex network is currently made up of six sites: CIC1, SPMX, CORX, GUAX, USMX and YESX (sopac.ucsd.edu). Recently, we implemented an experimental GPS processing lab as part of the Geodesy and Geodynamics Laboratory in the Seismology Department at CICESE. 30 stations are now currently processed from the network Red Geodesica Nacional Activa (RGNA-INEGI), NoWMex, and sites in neighbor countries. Fiducials solutions in ITRF2000 are obtained using GAMIT/GLOBK 10.31 with final igs orbits, every month since 2006. In order to make a contribution to densification of ITRF and support NAREF, SIRGAS and SNARF issues related to scientific and geomatics results; we are looking for internal (Mexican) and external colleagues as well as funding for maintenance and increase the number of CGNSS in NoWMeX including southern Basin and Ranger (Sonora, Chihuahua, Sinaloa and Durango), Gulf of California islands, Peninsular Californias, Nayarit, Jalisco, Colima and the Mexican Pacific islands: Guadalupe (2 more sites), Cedros, Socorro (DORIS site), Clarion and Tres Marias. We must to build more and free available CGNSS sites in and around Mexico to contribute to sea level rise and global change studies.