Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Schedule for Diesel Cycle Vehicles Equipped With Periodically Regenerating Trap Oxidizer Systems Certifying...
Development of an accelerated reliability test schedule for terrestrial solar cells
NASA Technical Reports Server (NTRS)
Lathrop, J. W.; Prince, J. L.
1981-01-01
An accelerated test schedule using a minimum amount of tests and a minimum number of cells has been developed on the basis of stress test results obtained from more than 1500 cells of seven different cell types. The proposed tests, which include bias-temperature, bias-temperature-humidity, power cycle, thermal cycle, and thermal shock tests, use as little as 10 and up to 25 cells, depending on the test type.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...
A cycle timer for testing electric vehicles
NASA Technical Reports Server (NTRS)
Soltis, R. F.
1978-01-01
A cycle timer was developed to assist the driver of an electric vehicle in more accurately following and repeating SAE driving schedules. These schedules require operating an electric vehicle in a selected stop-and-go driving cycle and repeating this cycle pattern until the vehicle ceases to meet the requirements of the cycle. The heart of the system is a programmable read-only memory (PROM) that has the required test profiles permanently recorded on plug-in cards, one card for each different driving schedule. The PROM generates a direct current analog signal that drives a speedometer displayed on one scale of a dual movement meter. The second scale of the dual movement meter displays the actual speed of the vehicle as recorded by the fifth wheel. The vehicle operator controls vehicle speed to match the desired profile speed. The PROM controls the recycle start time as well as the buzzer activation. The cycle programmer is powered by the test vehicle's 12-volt accessory battery, through a 5-volt regulator and a 12-volt dc-to-dc converter.
10 CFR 474.4 - Test procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special...
Definition study for variable cycle engine testbed engine and associated test program
NASA Technical Reports Server (NTRS)
Vdoviak, J. W.
1978-01-01
The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.
40 CFR Appendix II to Part 86 - Temperature Schedules
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Temperature Schedules II Appendix II... to Part 86—Temperature Schedules (a) Ambient temperature cycle for the diurnal emission portion of the evaporative emission test (see § 86.133). Table I—Temperature Versus Time Sequence Use linear...
40 CFR Appendix II to Part 86 - Temperature Schedules
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Temperature Schedules II Appendix II... Appendix II to Part 86—Temperature Schedules (a) Ambient temperature cycle for the diurnal emission portion of the evaporative emission test (see § 86.133). Table I—Temperature Versus Time Sequence Use linear...
40 CFR Appendix II to Part 86 - Temperature Schedules
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 20 2013-07-01 2013-07-01 false Temperature Schedules II Appendix II... Appendix II to Part 86—Temperature Schedules (a) Ambient temperature cycle for the diurnal emission portion of the evaporative emission test (see § 86.133). Table I—Temperature Versus Time Sequence Use linear...
40 CFR Appendix II to Part 86 - Temperature Schedules
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 19 2011-07-01 2011-07-01 false Temperature Schedules II Appendix II... Appendix II to Part 86—Temperature Schedules (a) Ambient temperature cycle for the diurnal emission portion of the evaporative emission test (see § 86.133). Table I—Temperature Versus Time Sequence Use linear...
40 CFR Appendix II to Part 86 - Temperature Schedules
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Temperature Schedules II Appendix II... Appendix II to Part 86—Temperature Schedules (a) Ambient temperature cycle for the diurnal emission portion of the evaporative emission test (see § 86.133). Table I—Temperature Versus Time Sequence Use linear...
Ma, Cynthia; Mandrekar, Sumithra J; Alberts, Steven R; Croghan, Gary A; Jatoi, Aminah; Reid, Joel M; Hanson, Lorelei J; Bruzek, Laura; Tan, Angelina D; Pitot, Henry C; Erlichman, Charles; Wright, John J; Adjei, Alex A
2007-02-01
Bortezomib, a selective inhibitor of the 20S proteasome with activity in a variety of cancers, exhibits sequence-dependent synergistic cytotoxicity with taxanes and platinum agents. Two different treatment schedules of bortezomib in combination with paclitaxel and carboplatin were tested in this phase I study to evaluate the effects of scheduling on toxicities, pharmacodynamics and clinical activity. Patients with advanced malignancies were alternately assigned to receive (schedule A) paclitaxel and carboplatin (IV d1) followed by bortezomib (IV d2, d5, d8) or (schedule B) bortezomib (IV d1, d4, d8) followed by paclitaxel and carboplatin (IV d2) on a 21-day cycle. Fifty-three patients (A 25, B 28) were treated with a median of 3 cycles (range 1-8) for schedule A and 3.5 cycles (range 1-10) for schedule B. Grade 3 or higher treatment related hematologic adverse events in all cycles of treatment included neutropenia (A 52%, B 50%), anemia (A 12%, B 7.1%) and thrombocytopenia (A 16%, B 17.9%). Non-hematologic treatment related adverse events were fairly mild (primarily grades 1 and 2). The maximum tolerated dose and the recommended doses for future phase II trials are bortezomib 1.2 mg/m2, paclitaxel 135 mg/m2 and carboplatin AUC = 6 for schedule A and bortezomib 1.2 mg/m2, paclitaxel 175 mg/m2 and carboplatin AUC = 6 for schedule B. Six (21.4%) partial responses (PR) were seen with schedule B. In contrast, only 1 (4%) PR was achieved with schedule A. Similar proteasome inhibition was achieved at MTD for both schedules. Administration of sequential bortezomib followed by chemotherapy (schedule B) was well tolerated and associated with an encouraging number of objective responses in this small group of patients. Further studies with this administration schedule are warranted.
Avallone, Antonio; Pecori, Biagio; Bianco, Franco; Aloj, Luigi; Tatangelo, Fabiana; Romano, Carmela; Granata, Vincenza; Marone, Pietro; Leone, Alessandra; Botti, Gerardo; Petrillo, Antonella; Caracò, Corradina; Iaffaioli, Vincenzo R; Muto, Paolo; Romano, Giovanni; Comella, Pasquale; Budillon, Alfredo; Delrio, Paolo
2015-10-06
We have previously shown that an intensified preoperative regimen including oxaliplatin plus raltitrexed and 5-fluorouracil/folinic acid (OXATOM/FUFA) during preoperative pelvic radiotherapy produced promising results in locally advanced rectal cancer (LARC). Preclinical evidence suggests that the scheduling of bevacizumab may be crucial to optimize its combination with chemo-radiotherapy. This non-randomized, non-comparative, phase II study was conducted in MRI-defined high-risk LARC. Patients received three biweekly cycles of OXATOM/FUFA during RT. Bevacizumab was given 2 weeks before the start of chemo-radiotherapy, and on the same day of chemotherapy for 3 cycles (concomitant-schedule A) or 4 days prior to the first and second cycle of chemotherapy (sequential-schedule B). Primary end point was pathological complete tumor regression (TRG1) rate. The accrual for the concomitant-schedule was early terminated because the number of TRG1 (2 out of 16 patients) was statistically inconsistent with the hypothesis of activity (30%) to be tested. Conversely, the endpoint was reached with the sequential-schedule and the final TRG1 rate among 46 enrolled patients was 50% (95% CI 35%-65%). Neutropenia was the most common grade ≥ 3 toxicity with both schedules, but it was less pronounced with the sequential than concomitant-schedule (30% vs. 44%). Postoperative complications occurred in 8/15 (53%) and 13/46 (28%) patients in schedule A and B, respectively. At 5 year follow-up the probability of PFS and OS was 80% (95%CI, 66%-89%) and 85% (95%CI, 69%-93%), respectively, for the sequential-schedule. These results highlights the relevance of bevacizumab scheduling to optimize its combination with preoperative chemo-radiotherapy in the management of LARC.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
Schroeder, Analyne M; Truong, Danny; Loh, Dawn H; Jordan, Maria C; Roos, Kenneth P; Colwell, Christopher S
2012-01-01
The circadian system co-ordinates the temporal patterning of behaviour and many underlying biological processes. In some cases, the regulated outputs of the circadian system, such as activity, may be able to feed back to alter core clock processes. In our studies, we used four wheel-access conditions (no access; free access; early night; and late night) to manipulate the duration and timing of activity while under the influence of a light–dark cycle. In wild-type mice, scheduled wheel access was able to increase ambulatory activity, inducing a level of exercise driven at various phases of the light–dark cycle. Scheduled exercise also manipulated the magnitude and phasing of the circadian-regulated outputs of heart rate and body temperature. At a molecular level, the phasing and amplitude of PER2::LUCIFERASE (PER2::LUC) expression rhythms in the SCN and peripheral tissues of Per2::Luc knockin mice were altered by scheduled exercise. We then tested whether scheduled wheel access could improve deficits observed in vasointestinal polypeptide-deficient mice under the influence of a light–dark cycle. We found that scheduled wheel access during the late night improved many of the behavioural, physiological and molecular deficits previously described in vasointestinal polypeptide-deficient mice. Our results raise the possibility that scheduled exercise could be used as a tool to modulate daily rhythms and, when applied, may counteract some of the negative impacts of ageing and disease on the circadian system. PMID:22988135
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Woohyun; Katipamula, Srinivas; Lutes, Robert G.
Small- and medium-sized (<100,000 sf) commercial buildings (SMBs) represent over 95% of the U.S. commercial building stock and consume over 60% of total site energy consumption. Many of these buildings use rudimentary controls that are mostly manual, with limited scheduling capability, no monitoring or failure management. Therefore, many of these buildings are operated inefficiently and consume excess energy. SMBs typically utilize packaged rooftop units (RTUs) that are controlled by an individual thermostat. There is increased urgency to improve the operating efficiency of existing commercial building stock in the U.S. for many reasons, chief among them is to mitigate the climatemore » change impacts. Studies have shown that managing set points and schedules of the RTUs will result in up to 20% energy and cost savings. Another problem associated with RTUs is short-cycling, where an RTU goes through ON and OFF cycles too frequently. Excessive cycling can lead to excessive wear and lead to premature failure of the compressor or its components. The short cycling can result in a significantly decreased average efficiency (up to 10%), even if there are no physical failures in the equipment. Also, SMBs use a time-of-day scheduling is to start the RTUs before the building will be occupied and shut it off when unoccupied. Ensuring correct use of the zone set points and eliminating frequent cycling of RTUs thereby leading to persistent building operations can significantly increase the operational efficiency of the SMBs. A growing trend is to use low-cost control infrastructure that can enable scalable and cost-effective intelligent building operations. The work reported in this report describes three algorithms for detecting the zone set point temperature, RTU cycling rate and occupancy schedule detection that can be deployed on the low-cost infrastructure. These algorithms only require the zone temperature data for detection. The algorithms have been tested and validated using field data from a number of RTUs from six buildings in different climate locations. Overall, the algorithms were successful in detecting the set points and ON/OFF cycles accurately using the peak detection technique and occupancy schedule using symbolic aggregate approximation technique. The report describes the three algorithms, results from testing the algorithms using field data, how the algorithms can be used to improve SMBs efficiency, and presents related conclusions.« less
NASA Astrophysics Data System (ADS)
Hamilton, J. A.; Rand, D. A. J.
1983-03-01
A test rig has been designed and constructed to examine the performance of batteries under laboratory conditions that simulate the power characteristics of electric vehicles. Each station in the rig subjects a battery to continuous charge/discharge cycles, with an equalising charge every eighth cycle. The battery discharge follows the current-verse-time profile of a given vehicle operating under a driving schedule normal to road service. The test rig allows both smooth- and pulsed-current discharge to be investigated. Data collection is accomplished either with multi-pen recorders or with a computer-based information logger.
WFPC2 CYCLE 15 Intflat Linearity Check and Filter Rotation Anomaly Monitor
NASA Astrophysics Data System (ADS)
Gonzaga, Shireen
2006-07-01
Intflat observations will be taken to provide a linearity check: the linearity test consists of a series of intflats in F555W, in each gain and each shutter. A combination of intflats, visflats, and earthflats will be used to check the repeatability of filter wheel motions. {Intflat sequences tied to decons, visits 1-18 in prop 10363, have been moved to the cycle 15 decon proposal xxxx for easier scheduling.} Note: long-exposure WFPC2 intflats must be scheduled during ACS anneals to prevent stray light from the WFPC2 lamps from contaminating long ACS external exposures.
40 CFR 1066.410 - Dynamometer test procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... drive mode. (For purposes of this paragraph (g), the term four-wheel drive includes other multiple drive... Dynamometer test procedure. (a) Dynamometer testing may consist of multiple drive cycles with both cold-start...-setting part identifies the driving schedules and the associated sample intervals, soak periods, engine...
Avallone, Antonio; Pecori, Biagio; Bianco, Franco; Aloj, Luigi; Tatangelo, Fabiana; Romano, Carmela; Granata, Vincenza; Marone, Pietro; Leone, Alessandra; Botti, Gerardo; Petrillo, Antonella; Caracò, Corradina; Iaffaioli, Vincenzo R.; Muto, Paolo; Romano, Giovanni; Comella, Pasquale; Budillon, Alfredo; Delrio, Paolo
2015-01-01
Background We have previously shown that an intensified preoperative regimen including oxaliplatin plus raltitrexed and 5-fluorouracil/folinic acid (OXATOM/FUFA) during preoperative pelvic radiotherapy produced promising results in locally advanced rectal cancer (LARC). Preclinical evidence suggests that the scheduling of bevacizumab may be crucial to optimize its combination with chemo-radiotherapy. Patients and methods This non-randomized, non-comparative, phase II study was conducted in MRI-defined high-risk LARC. Patients received three biweekly cycles of OXATOM/FUFA during RT. Bevacizumab was given 2 weeks before the start of chemo-radiotherapy, and on the same day of chemotherapy for 3 cycles (concomitant-schedule A) or 4 days prior to the first and second cycle of chemotherapy (sequential-schedule B). Primary end point was pathological complete tumor regression (TRG1) rate. Results The accrual for the concomitant-schedule was early terminated because the number of TRG1 (2 out of 16 patients) was statistically inconsistent with the hypothesis of activity (30%) to be tested. Conversely, the endpoint was reached with the sequential-schedule and the final TRG1 rate among 46 enrolled patients was 50% (95% CI 35%–65%). Neutropenia was the most common grade ≥3 toxicity with both schedules, but it was less pronounced with the sequential than concomitant-schedule (30% vs. 44%). Postoperative complications occurred in 8/15 (53%) and 13/46 (28%) patients in schedule A and B, respectively. At 5 year follow-up the probability of PFS and OS was 80% (95%CI, 66%–89%) and 85% (95%CI, 69%–93%), respectively, for the sequential-schedule. Conclusions These results highlights the relevance of bevacizumab scheduling to optimize its combination with preoperative chemo-radiotherapy in the management of LARC. PMID:26320185
Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
NASA Technical Reports Server (NTRS)
Wilcox, Margaret
2008-01-01
A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.
Van Dongen, Hans P A; Belenky, Gregory; Vila, Bryan J
2011-07-01
Under simulated shift-work conditions, we investigated the efficacy of a restart break for maintaining neurobehavioral functioning across consecutive duty cycles, as a function of the circadian timing of the duty periods. As part of a 14-day experiment, subjects underwent two cycles of five simulated daytime or nighttime duty days, separated by a 34-hour restart break. Cognitive functioning and high-fidelity driving simulator performance were tested 4 times per day during the two duty cycles. Lapses on a psychomotor vigilance test (PVT) served as the primary outcome variable. Selected sleep periods were recorded polysomnographically. The experiment was conducted under standardized, controlled laboratory conditions with continuous monitoring. Twenty-seven healthy adults (13 men, 14 women; aged 22-39 years) participated in the study. Subjects were randomly assigned to a nighttime duty (experimental) condition or a daytime duty (control) condition. The efficacy of the 34-hour restart break for maintaining neurobehavioral functioning from the pre-restart duty cycle to the post-restart duty cycle was compared between these two conditions. Relative to the daytime duty condition, the nighttime duty condition was associated with reduced amounts of sleep, whereas sleep latencies were shortened and slow-wave sleep appeared to be conserved. Neurobehavioral performance measures ranging from lapses of attention on the PVT to calculated fuel consumption on the driving simulators remained optimal across time of day in the daytime duty schedule, but degraded across time of night in the nighttime duty schedule. The 34-hour restart break was efficacious for maintaining PVT performance and other objective neurobehavioral functioning profiles from one duty cycle to the next in the daytime duty condition, but not in the nighttime duty condition. Subjective sleepiness did not reliably track objective neurobehavioral deficits. The 34-hour restart break was adequate for maintaining performance in the case of optimal circadian placement of sleep and duty periods (control condition) but was inadequate (and perhaps even detrimental) for maintaining performance in a simulated nighttime duty schedule (experimental condition). Current US transportation hours-of-service regulations mandate time off duty but do not consider the circadian aspects of shift scheduling. Reinforcing a recent trend of applying sleep science to inform policymaking for duty and rest times, our findings indicate that restart provisions in hours-of-service regulations could be improved by taking the circadian timing of the duty schedules into account.
Thermal-Aware Test Access Mechanism and Wrapper Design Optimization for System-on-Chips
NASA Astrophysics Data System (ADS)
Yu, Thomas Edison; Yoneda, Tomokazu; Chakrabarty, Krishnendu; Fujiwara, Hideo
Rapid advances in semiconductor manufacturing technology have led to higher chip power densities, which places greater emphasis on packaging and temperature control during testing. For system-on-chips, peak power-based scheduling algorithms have been used to optimize tests under specified power constraints. However, imposing power constraints does not always solve the problem of overheating due to the non-uniform distribution of power across the chip. This paper presents a TAM/Wrapper co-design methodology for system-on-chips that ensures thermal safety while still optimizing the test schedule. The method combines a simplified thermal-cost model with a traditional bin-packing algorithm to minimize test time while satisfying temperature constraints. Furthermore, for temperature checking, thermal simulation is done using cycle-accurate power profiles for more realistic results. Experiments show that even a minimal sacrifice in test time can yield a considerable decrease in test temperature as well as the possibility of further lowering temperatures beyond those achieved using traditional power-based test scheduling.
Technology development and demonstration of a low thrust resistojet thruster
NASA Technical Reports Server (NTRS)
Pfeifer, G. R.
1972-01-01
Three thrusters were fabricated to definitized thruster drawings using new rhenium vapor deposition technology. Two of the thrusters were operated using ammonia as propellant and one was operated using hydrogen propellant for performance determination. All demonstrated consistent operational specific impulse performance while demonstrating thermal performance better than the development units from which they evolved. Two of the thrusters were subjected to environmental structural testing including vibration, acceleration and shock loading to specifications. Both of the thrusters subjected to the environmental tests passed all required tests. The third, spare, thruster was introduced into the life test portion of the program. Two thrusters were then subjected to a life cycling test program under typical spacecraft operating power levels. During the life test sequence, the hydrogen thruster accrued 720 operating life test cycles, more than 370 on-off cycles and 365 hours of powered up time. The ammonia accrued approximately 380 on-off cycles and 392.2 on time hours of operation during the 720 cycling hour test. Both thrusters completed the scheduled operational life test in reasonably good condition, structurally integral and capable of indefinite further operation.
Summary of Rocketdyne Engine A5 Rocket Based Combined Cycle Testing
NASA Technical Reports Server (NTRS)
Ketchum. A.; Emanuel, Mark; Cramer, John
1998-01-01
Rocketdyne Propulsion and Power (RPP) has completed a highly successful experimental test program of an advanced rocket based combined cycle (RBCC) propulsion system. The test program was conducted as part of the Advanced Reusable Technology program directed by NASA-MSFC to demonstrate technologies for low-cost access to space. Testing was conducted in the new GASL Flight Acceleration Simulation Test (FAST) facility at sea level (Mach 0), Mach 3.0 - 4.0, and vacuum flight conditions. Significant achievements obtained during the test program include 1) demonstration of engine operation in air-augmented rocket mode (AAR), ramjet mode and rocket mode and 2) smooth transition from AAR to ramjet mode operation. Testing in the fourth mode (scramjet) is scheduled for November 1998.
Comparison of OPC job prioritization schemes to generate data for mask manufacturing
NASA Astrophysics Data System (ADS)
Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark
2015-03-01
Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.
Community noise sources and noise control issues
NASA Technical Reports Server (NTRS)
Nihart, Gene L.
1992-01-01
The topics covered include the following: community noise sources and noise control issues; noise components for turbine bypass turbojet engine (TBE) turbojet; engine cycle selection and noise; nozzle development schedule; NACA nozzle design; NACA nozzle test results; nearly fully mixed (NFM) nozzle design; noise versus aspiration rate; peak noise test results; nozzle test in the Low Speed Aeroacoustic Facility (LSAF); and Schlieren pictures of NACA nozzle.
Accelerated stress testing of terrestrial solar cells
NASA Technical Reports Server (NTRS)
Lathrop, J. W.; Hawkins, D. C.; Prince, J. L.; Walker, H. A.
1982-01-01
The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.
1976-11-01
system. b. Read different program configurations to reconfigure the software during flight. c. Write Digital Integrated Test System (DITS) results...associated witn > inor C):l.e Event must be Unlatched. The sole difference between a Latched ana an lnratcrec Condition is that upon the Scheduling...Table. Furthermore, the block of pointers for one Minor Cycle may be wholly contained witnir the Diock of ocinters for a different Minor Cycle. For
Van Dongen, Hans P.A.; Belenky, Gregory; Vila, Bryan J.
2011-01-01
Objectives: Under simulated shift-work conditions, we investigated the efficacy of a restart break for maintaining neurobehavioral functioning across consecutive duty cycles, as a function of the circadian timing of the duty periods. Design: As part of a 14-day experiment, subjects underwent two cycles of five simulated daytime or nighttime duty days, separated by a 34-hour restart break. Cognitive functioning and high-fidelity driving simulator performance were tested 4 times per day during the two duty cycles. Lapses on a psychomotor vigilance test (PVT) served as the primary outcome variable. Selected sleep periods were recorded polysomnographically. Setting: The experiment was conducted under standardized, controlled laboratory conditions with continuous monitoring. Participants: Twenty-seven healthy adults (13 men, 14 women; aged 22–39 years) participated in the study. Interventions: Subjects were randomly assigned to a nighttime duty (experimental) condition or a daytime duty (control) condition. The efficacy of the 34-hour restart break for maintaining neurobehavioral functioning from the pre-restart duty cycle to the post-restart duty cycle was compared between these two conditions. Results: Relative to the daytime duty condition, the nighttime duty condition was associated with reduced amounts of sleep, whereas sleep latencies were shortened and slow-wave sleep appeared to be conserved. Neurobehavioral performance measures ranging from lapses of attention on the PVT to calculated fuel consumption on the driving simulators remained optimal across time of day in the daytime duty schedule, but degraded across time of night in the nighttime duty schedule. The 34-hour restart break was efficacious for maintaining PVT performance and other objective neurobehavioral functioning profiles from one duty cycle to the next in the daytime duty condition, but not in the nighttime duty condition. Subjective sleepiness did not reliably track objective neurobehavioral deficits. Conclusions: The 34-hour restart break was adequate for maintaining performance in the case of optimal circadian placement of sleep and duty periods (control condition) but was inadequate (and perhaps even detrimental) for maintaining performance in a simulated nighttime duty schedule (experimental condition). Current US transportation hours-of-service regulations mandate time off duty but do not consider the circadian aspects of shift scheduling. Reinforcing a recent trend of applying sleep science to inform policymaking for duty and rest times, our findings indicate that restart provisions in hours-of-service regulations could be improved by taking the circadian timing of the duty schedules into account. Citation: Van Dongen HPA; Belenky G; Vila BJ. The efficacy of a restart break for recycling with optimal performance depends critically on circadian timing. SLEEP 2011;34(7):917-929. PMID:21731142
Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) Project Status as of May 2010
NASA Technical Reports Server (NTRS)
Striepe, Scott A.; Epp, Chirold D.; Robertson, Edward A.
2010-01-01
This paper includes the current status of NASA s Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) Project. The ALHAT team has completed several flight tests and two major design analysis cycles. These tests and analyses examine terrain relative navigation sensors, hazard detection and avoidance sensors and algorithms, and hazard relative navigation algorithms, and the guidance and navigation system using these ALHAT functions. The next flight test is scheduled for July 2010. The paper contains results from completed flight tests and analysis cycles. ALHAT system status, upcoming tests and analyses is also addressed. The current ALHAT plans as of May 2010 are discussed. Application of the ALHAT system to landing on bodies other than the Moon is included
Messing, K; Saurel-Cubizolles, M J; Bourgine, M; Kaminski, M
1992-10-01
The food and agriculture industry employs 14.6% of the female industrial work force in France. Workers are exposed to a variety of environmental and organizational constraints (eg, irregular schedules, cold, uncomfortable postures, repetitive movements). In 1987-1988 a medical examination and questionnaire were administered to 726 workers with menstrual periods in 17 poultry slaughterhouses and six canning factories. Anomalies (irregular cycles, amenorrhea, long cycles) during the previous year were associated with work conditions. After adjustment for relevant nonoccupational variables, irregular cycles were significantly related to schedule variability and cold exposure, amenorrhea was associated with cold exposure, and long cycles with schedule variability. Other parameters such as repetitive work, standing posture, lifting weights, job satisfaction, and hours of domestic work were not associated with cycle anomalies. Cycle anomalies may be a useful indicator of occupational effects on female reproduction, analogous to the use of sperm parameters to warn of effects on male workers.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... Fifth Report and Order; Announces Schedule for Pleading Cycle AGENCY: Federal Communications Commission... Alert System (EAS) Fifth Report and Order, and announces a schedule for the pleading cycle. DATES... process last at least one year. By the Public Notice, the Commission establishes a pleading cycle for...
The Design of a Real Time Operating System for a Fault Tolerant Microcomputer
1986-12-01
Scheduler then enqueues all the new jobs for the new frame. Upon completion of the Purge and Task Scheduler routines the Cycle Interrupt Handler returns...the scheduling of new tasks in a new minor cycle to make room for the new jobs . The purge operation will usually not remove the same number of jobs each
Heuristic-based scheduling algorithm for high level synthesis
NASA Technical Reports Server (NTRS)
Mohamed, Gulam; Tan, Han-Ngee; Chng, Chew-Lye
1992-01-01
A new scheduling algorithm is proposed which uses a combination of a resource utilization chart, a heuristic algorithm to estimate the minimum number of hardware units based on operator mobilities, and a list-scheduling technique to achieve fast and near optimal schedules. The schedule time of this algorithm is almost independent of the length of mobilities of operators as can be seen from the benchmark example (fifth order digital elliptical wave filter) presented when the cycle time was increased from 17 to 18 and then to 21 cycles. It is implemented in C on a SUN3/60 workstation.
Evaluation of Environmental Profiles for Reliability Demonstration
1975-09-01
the increase in the ram air flow rate. As a result, one cannot generalize in advance about the effect of velocity increase on air-conditioner turbine ...152 6.2.6.3 Forced Cooling Air Temperature/ Flow Schedule. 152 Sample Test Provile ....... .............. 154 6.2.8 Profiles for Multi...Profiles for Reliability Demonstration Study Flow ....... . ....... 7 2 Typical MIL-STD-781 Profile ................ 23 3 Test Cycle A - Ambient Cooled
Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization
NASA Astrophysics Data System (ADS)
Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.
2018-06-01
The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.
Development and Testing of an UltraBattery-Equipped Honda Civic Hybrid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sally; Tyler Gray; Pattie Hovorka
2012-08-01
The UltraBattery Retrofit Project DP1.8 and Carbon Enriched Project C3, performed by ECOtality North America (ECOtality) and funded by the U.S. Department of Energy and the Advanced Lead Acid Battery Consortium (ALABC), are established to demonstrate the suitability of advanced lead battery technology in hybrid electrical vehicles (HEVs). A profile, termed the “Simulated Honda Civic HEV Profile” (SHCHEVP) has been developed in Project DP1.8 in order to provide reproducible laboratory evaluations of different battery types under real-world HEV conditions. The cycle is based on the Urban Dynamometer Driving Schedule and Highway Fuel Economy Test cycles and simulates operation of amore » battery pack in a Honda Civic HEV. One pass through the SHCHEVP takes 2,140 seconds and simulates 17.7 miles of driving. A complete nickel metal hydride (NiMH) battery pack was removed from a Honda Civic HEV and operated under SHCHEVP to validate the profile. The voltage behavior and energy balance of the battery during this operation was virtually the same as that displayed by the battery when in the Honda Civic operating on the dynamometer under the Urban Dynamometer Driving Schedule and Highway Fuel Economy Test cycles, thus confirming the efficacy of the simulated profile. An important objective of the project has been to benchmark the performance of the UltraBatteries manufactured by both Furukawa Battery Co., Ltd., Japan (Furakawa) and East Penn Manufacturing Co., Inc. (East Penn). Accordingly, UltraBattery packs from both Furakawa and East Penn have been characterized under a range of conditions. Resistance measurements and capacity tests at various rates show that both battery types are very similar in performance. Both technologies, as well as a standard lead-acid module (included for baseline data), were evaluated under a simple HEV screening test. Both Furakawa and East Penn UltraBattery packs operated for over 32,000 HEV cycles, with minimal loss in performance; whereas the standard lead-acid unit experienced significant degradation after only 6,273 cycles. The high-carbon, ALABC battery manufactured in Project C3 also was tested under the advanced HEV schedule. Its performance was significantly better than the standard lead-acid unit, but was still inferior compared with the UltraBattery. The batteries supplied by Exide as part of the C3 Project performed well under the HEV screening test, especially at high temperatures. The results suggest that higher operating temperatures may improve the performance of lead-acid-based technologies operated under HEV conditions—it is recommended that life studies be conducted on these technologies under such conditions.« less
Recent Cycle Time Reduction at Langley Research Center
NASA Technical Reports Server (NTRS)
Kegelman, Jerome T.
2000-01-01
The NASA Langley Research Center (LaRC) has been engaged in an effort to reduce wind tunnel test cycle time in support of Agency goals and to satisfy the wind tunnel testing needs of the commercial and military aerospace communities. LaRC has established the Wind Tunnel Enterprise (WTE), with goals of reducing wind tunnel test cycle time by an order of magnitude by 2002, and by two orders of magnitude by 2010. The WTE also plans to meet customer expectations for schedule integrity, as well as data accuracy and quality assurance. The WTE has made progress towards these goals over the last year with a focused effort on technological developments balanced by attention to process improvements. This paper presents a summary of several of the WTE activities over the last year that are related to test cycle time reductions at the Center. Reducing wind tunnel test cycle time, defined here as the time between the freezing of loft lines and delivery of test data, requires that the relationship between high productivity and data quality assurance be considered. The efforts have focused on all of the drivers for test cycle time reduction, including process centered improvements, facility upgrades, technological improvements to enhance facility readiness and productivity, as well as advanced measurement techniques. The application of internet tools and computer modeling of facilities to allow a virtual presence of the customer team is also presented.
J-2X Upper Stage Engine: Hardware and Testing 2009
NASA Technical Reports Server (NTRS)
Buzzell, James C.
2009-01-01
Mission: Common upper stage engine for Ares I and Ares V. Challenge: Use proven technology from Saturn X-33, RS-68 to develop the highest Isp GG cycle engine in history for 2 missions in record time . Key Features: LOX/LH2 GG cycle, series turbines (2), HIP-bonded MCC, pneumatic ball-sector valves, on-board engine controller, tube-wall regen nozzle/large passively-cooled nozzle extension, TEG boost/cooling . Development Philosophy: proven hardware, aggressive schedule, early risk reduction, requirements-driven.
20V, 40 Ah Lithium Ion Polymer Battery for the Spacesuit
NASA Technical Reports Server (NTRS)
Darcy, Eric; Wilburn, Monique; Hall, Dan; Roth, Peter; Das Gupta, Sankar; Jacobs, Jim; Bhola, Rakesh; Milicic, Gordan; Vandemeer, Dave
2006-01-01
Objective: Consider a new battery design for EMU. Results: a) Electrovaya s aerospace cell production line is improving, but must further improve to achieve acceptable reliability; b) Completed functional, vibration, and thermal cycling of LIB; c) So far, electrical safety tests have produced good results; d) Completed functional, vibration, thermal cycling, power quality and EMI of LIB Charger; e) Completed CDR on 9/23/04; and f) Manufacturing Readiness Review for flight cell/battery production scheduled for Dec 04.
Study on the Modifications Required to Re-Engine the Lockheed D-21 Drone
NASA Technical Reports Server (NTRS)
1999-01-01
This report was prepared by Lockheed Martin (LM). The purpose of this 45 day study contract was to investigate the feasibility of using the D-21 as a Rocket Based Combined Cycle engine test-bed. The new NASA engine is entitled "Demonstration of Rocket Combined Cycle Operations (DRACO)". Four objectives were defined and modification study provide an estimation of the: (1) mudified vehicle performance; (2) required engine performance; (3) required vehicle modification; and (4) modification cost and schedule.
Use of computerized interview scheduling program for pediatric surgery match applicants.
Stephens, Caroline Q; Hamilton, Nicholas A; Thompson, Ann E; Krishnaswami, Sanjay
2017-06-01
Pediatric surgery fellowship applicants and programs coordinate over 20 interviews per cycle. We hypothesized that replacing e-mail and phone communication with a computerized-scheduling program (CSP) could benefit both parties. We used a CSP to schedule 2016 interviews. Time to schedule and e-mail communication per applicant was compared to 2015, when traditional scheduling was used. Additionally, 2016 interviewees were surveyed about their experience with the CSP vs. traditional means. Analysis was performed using descriptive statistics and a Student's T-test. We found a significant decrease in mean scheduling time from 14.4 to 1.7h (p<0.001) and in e-mails exchanged from 3.4 to 1.0 (p<0.0001). Survey respondents reported 92% satisfaction with the CSP, and 87% found it easier to schedule interviews. Applicants also reported quicker finalization of interview dates (96%), improved access to interview slots (71%), and easier coordination of additional services and time off (63%). Notably, the mean longest time reported to schedule interviews using traditional methods was 7days (range 1-30). Overall, 84% supported widespread adoption of CSPs. Using CSPs improved the scheduling process for the significant majority of interviewees, and our program. If widely adopted, this could greatly improve the efficiency of pediatric surgery interview scheduling. N/A. Copyright © 2017 Elsevier Inc. All rights reserved.
Nappi, Rossella E; Lobo Abascal, Paloma; Hsieh, Jennifer; Micheletti, Marie-Christine
2017-01-01
To evaluate scheduled and unscheduled bleeding and spotting over 1 year of treatment with 91-day extended-regimen combined oral contraception (COC) providing continuous low-dose ethinyl estradiol (EE) in place of the traditional 7-day hormone-free interval (HFI). This post hoc analysis of a multicenter, open-label, 1-year, Phase 3 study of extended-regimen COC with 30 µg EE/150 µg levonorgestrel (LNG) for 84 days and EE 10 µg for 7 days included 799 sexually active, adult women who completed at least one 91-day cycle of therapy. Subjects recorded bleeding and spotting episodes daily using electronic diaries. Logistic regression analyses are reported as ORs with 95% CIs. There was a 10% increase (OR =1.102; 95% CI: 1.006-1.206) in the likelihood of reporting no scheduled bleeding for each additional 91-day cycle completed. From the third 91-day cycle, more than one fifth of women reported no scheduled bleeding (third cycle =23% [121/533]; fourth cycle =22% [97/446]). Among women who reported no scheduled bleeding at Cycle 1 (136/758 [18%]), ≥45% showed sustained lack of scheduled bleeding in later cycles. There were increases of 53% (OR =1.531; 95% CI: 1.393-1.683) and 31% (OR =1.307; 95% CI: 1.205-1.418) in the likelihood of reporting 0 to ≤6 days vs >6 days of unscheduled bleeding and spotting, respectively, for each additional 91-day cycle. By Cycle 2, more than 80% of women reported no unscheduled bleeding or ≤6 days of unscheduled bleeding during each 91-day cycle. Improved cycle control with decreased bleeding over time was shown during extended-regimen COC with 30 µg EE/150 µg LNG for 84 days and continuous low-dose EE instead of the traditional 7-day HFI. Women considering this regimen should be informed that those who complete at least one 91-day COC cycle will likely experience less bleeding/spotting in future cycles.
Nappi, Rossella E; Lobo Abascal, Paloma; Hsieh, Jennifer; Micheletti, Marie-Christine
2017-01-01
Purpose To evaluate scheduled and unscheduled bleeding and spotting over 1 year of treatment with 91-day extended-regimen combined oral contraception (COC) providing continuous low-dose ethinyl estradiol (EE) in place of the traditional 7-day hormone-free interval (HFI). Patients and methods This post hoc analysis of a multicenter, open-label, 1-year, Phase 3 study of extended-regimen COC with 30 µg EE/150 µg levonorgestrel (LNG) for 84 days and EE 10 µg for 7 days included 799 sexually active, adult women who completed at least one 91-day cycle of therapy. Subjects recorded bleeding and spotting episodes daily using electronic diaries. Logistic regression analyses are reported as ORs with 95% CIs. Results There was a 10% increase (OR =1.102; 95% CI: 1.006–1.206) in the likelihood of reporting no scheduled bleeding for each additional 91-day cycle completed. From the third 91-day cycle, more than one fifth of women reported no scheduled bleeding (third cycle =23% [121/533]; fourth cycle =22% [97/446]). Among women who reported no scheduled bleeding at Cycle 1 (136/758 [18%]), ≥45% showed sustained lack of scheduled bleeding in later cycles. There were increases of 53% (OR =1.531; 95% CI: 1.393–1.683) and 31% (OR =1.307; 95% CI: 1.205–1.418) in the likelihood of reporting 0 to ≤6 days vs >6 days of unscheduled bleeding and spotting, respectively, for each additional 91-day cycle. By Cycle 2, more than 80% of women reported no unscheduled bleeding or ≤6 days of unscheduled bleeding during each 91-day cycle. Conclusion Improved cycle control with decreased bleeding over time was shown during extended-regimen COC with 30 µg EE/150 µg LNG for 84 days and continuous low-dose EE instead of the traditional 7-day HFI. Women considering this regimen should be informed that those who complete at least one 91-day COC cycle will likely experience less bleeding/spotting in future cycles. PMID:29042818
NASA Technical Reports Server (NTRS)
2011-01-01
NASA is interested in developing technology that leads to more routine, safe, and affordable access to space. Access to space using airbreathing propulsion systems has potential to meet these objectives based on Airbreathing Access to Space (AAS) system studies. To this end, the NASA Fundamental Aeronautics Program (FAP) Hypersonic Project is conducting fundamental research on a Turbine Based Combined Cycle (TBCC) propulsion system. The TBCC being studied considers a dual flow-path inlet system. One flow-path includes variable geometry to regulate airflow to a turbine engine cycle. The turbine cycle provides propulsion from take-off to supersonic flight. The second flow-path supports a dual-mode scramjet (DMSJ) cycle which would be initiated at supersonic speed to further accelerate the vehicle to hypersonic speed. For a TBCC propulsion system to accelerate a vehicle from supersonic to hypersonic speed, a critical enabling technology is the ability to safely and effectively transition from the turbine to the DMSJ-referred to as mode transition. To experimentally test methods of mode transition, a Combined Cycle Engine (CCE) Large-scale Inlet testbed was designed with two flow paths-a low speed flow-path sized for a turbine cycle and a high speed flow-path designed for a DMSJ. This testbed system is identified as the CCE Large-Scale Inlet for Mode Transition studies (CCE-LIMX). The test plan for the CCE-LIMX in the NASA Glenn Research Center (GRC) 10- by 10-ft Supersonic Wind Tunnel (10x10 SWT) is segmented into multiple phases. The first phase is a matrix of inlet characterization (IC) tests to evaluate the inlet performance and establish the mode transition schedule. The second phase is a matrix of dynamic system identification (SysID) experiments designed to support closed-loop control development at mode transition schedule operating points for the CCE-LIMX. The third phase includes a direct demonstration of controlled mode transition using a closed loop control system developed with the data obtained from the first two phases. Plans for a fourth phase include mode transition experiments with a turbine engine. This paper, focusing on the first two phases of experiments, presents developed operational and analysis tools for streamlined testing and data reduction procedures.
40 CFR 86.1333-90 - Transient test cycle generation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... zero percent speed specified in the engine dynamometer schedules (appendix I (f)(1), (f)(2), or (f)(3... feedback torque equal to zero (using, for example, clutch disengagement, speed to torque control switching... reference speed and reference torque are zero percent values. For each idle segment that is ten seconds or...
40 CFR 86.1333-90 - Transient test cycle generation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... zero percent speed specified in the engine dynamometer schedules (appendix I (f)(1), (f)(2), or (f)(3... feedback torque equal to zero (using, for example, clutch disengagement, speed to torque control switching... reference speed and reference torque are zero percent values. For each idle segment that is ten seconds or...
40 CFR 86.1333-90 - Transient test cycle generation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... zero percent speed specified in the engine dynamometer schedules (appendix I (f)(1), (f)(2), or (f)(3... feedback torque equal to zero (using, for example, clutch disengagement, speed to torque control switching... reference speed and reference torque are zero percent values. For each idle segment that is ten seconds or...
NASA Technical Reports Server (NTRS)
Wright, K. P. Jr; Hughes, R. J.; Kronauer, R. E.; Dijk, D. J.; Czeisler, C. A.
2001-01-01
Endogenous circadian clocks are robust regulators of physiology and behavior. Synchronization or entrainment of biological clocks to environmental time is adaptive and important for physiological homeostasis and for the proper timing of species-specific behaviors. We studied subjects in the laboratory for up to 55 days each to determine the ability to entrain the human clock to a weak circadian synchronizing stimulus [scheduled activity-rest cycle in very dim (approximately 1.5 lux in the angle of gaze) light-dark cycle] at three approximately 24-h periods: 23.5, 24.0, and 24.6 h. These studies allowed us to test two competing hypotheses as to whether the period of the human circadian pacemaker is near to or much longer than 24 h. We report here that imposition of a sleep-wake schedule with exposure to the equivalent of candle light during wakefulness and darkness during sleep is usually sufficient to maintain circadian entrainment to the 24-h day but not to a 23.5- or 24.6-h day. Our results demonstrate functionally that, in normally entrained sighted adults, the average intrinsic circadian period of the human biological clock is very close to 24 h. Either exposure to very dim light and/or the scheduled sleep-wake cycle itself can entrain this near-24-h intrinsic period of the human circadian pacemaker to the 24-h day.
NASA Technical Reports Server (NTRS)
Sargent, N. B.; Dustin, M. O.
1981-01-01
The electric test vehicle one (ETV-1) was built from the ground up with present state of the art technology. Two vehicles were built and are presently being evaluated by NASA's Jet Propulsion Laboratory (JPL). A duplicate set of propulsion system components was built, mounted on a breadboard, and delivered to NASA's Lewis Research Center for testing on the road load simulator (RLS). Driving cycle tests completed on the system are described.
Conceptual design of the MHD Engineering Test Facility
NASA Technical Reports Server (NTRS)
Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.
1981-01-01
The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.
Incentive-compatible demand-side management for smart grids based on review strategies
NASA Astrophysics Data System (ADS)
Xu, Jie; van der Schaar, Mihaela
2015-12-01
Demand-side load management is able to significantly improve the energy efficiency of smart grids. Since the electricity production cost depends on the aggregate energy usage of multiple consumers, an important incentive problem emerges: self-interested consumers want to increase their own utilities by consuming more than the socially optimal amount of energy during peak hours since the increased cost is shared among the entire set of consumers. To incentivize self-interested consumers to take the socially optimal scheduling actions, we design a new class of protocols based on review strategies. These strategies work as follows: first, a review stage takes place in which a statistical test is performed based on the daily prices of the previous billing cycle to determine whether or not the other consumers schedule their electricity loads in a socially optimal way. If the test fails, the consumers trigger a punishment phase in which, for a certain time, they adjust their energy scheduling in such a way that everybody in the consumer set is punished due to an increased price. Using a carefully designed protocol based on such review strategies, consumers then have incentives to take the socially optimal load scheduling to avoid entering this punishment phase. We rigorously characterize the impact of deploying protocols based on review strategies on the system's as well as the users' performance and determine the optimal design (optimal billing cycle, punishment length, etc.) for various smart grid deployment scenarios. Even though this paper considers a simplified smart grid model, our analysis provides important and useful insights for designing incentive-compatible demand-side management schemes based on aggregate energy usage information in a variety of practical scenarios.
Hubble Space Telescope Battery Capacity Update
NASA Technical Reports Server (NTRS)
Hollandsworth, Roger; Armantrout, Jon; Rao, Gopalakrishna M.
2007-01-01
Orbital battery performance for the Hubble Space Telescope is discussed and battery life is predicted which supports decision to replace orbital batteries by 2009-2010 timeframe. Ground characterization testing of cells from the replacement battery build is discussed, with comparison of data from battery capacity characterization with cell studies of Cycle Life and 60% Stress Test at the Naval Weapons Surface Center (NWSC)-Crane, and cell Cycle Life testing at the Marshal Space Flight Center (MSFC). The contents of this presentation includes an update to the performance of the on-orbit batteries, as well as a discussion of the HST Service Mission 4 (SM4) batteries manufactured in 1996 and activated in 2000, and a second set of SM4 backup replacement batteries which began manufacture Jan 11, 2007, with delivery scheduled for July 2008.
2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 1; Executive Summary
NASA Technical Reports Server (NTRS)
Alexander, Dennis
1997-01-01
The Solar Dynamic Ground Test Demonstration (SDGTD) successfully demonstrated a solar-powered closed Brayton cycle system in a relevant space thermal environment. In addition to meeting technical requirements the project was completed 4 months ahead of schedule and under budget. The following conclusions can be supported: 1. The component technology for solar dynamic closed Brayton cycle technology has clearly been demonstrated. 2. The thermal, optical, control, and electrical integration aspects of systems integration have also been successfully demonstrated. Physical integration aspects were not attempted as these tend to be driven primarily by mission-specific requirements. 3. System efficiency of greater than 15 percent (all losses fully accounted for) was demonstrated using equipment and designs which were not optimized. Some preexisting hardware was used to minimize cost and schedule. 4. Power generation of 2 kWe. 5. A NASA/industry team was developed that successfully worked together to accomplish project goals. The material presented in this report will show that the technology necessary to design and fabricate solar dynamic electrical power systems for space has been successfully developed and demonstrated. The data will further show that achieved results compare well with pretest predictions. The next step in the development of solar dynamic space power will be a flight test.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prince, J.L.; Lathrop, J.W.
1979-05-01
The results of accelerated stress testing of four different types of silicon terrestrial solar cells are discussed. The accelerated stress tests used included bias-temperature tests, bias-temperature-humidity tests, thermal cycle and thermal shock tests, and power cycle tests. Characterization of the cells was performed before stress testing and at periodic down-times, using electrical measurement, visual inspection, and metal adherence pull tests. Electrical parameters measured included short-circuit current, I/sub sc/, open circuit voltage, V/sub oc/, and output power, voltage, and current at the maximum power point, P/sub m/, V/sub m/, and I/sub m/ respectively. Incorporated in the report are the distributions ofmore » the prestress electrical data for all cell types. Data was also obtained on cell series and shunt resistance. Significant differences in the response to the various stress tests was observed between cell types. On the basis of the experience gained in this research work, a suggested Reliability Qualification Test Schedule was developed.« less
40 CFR 86.115-00 - EPA dynamometer driving schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for 1977 and Later Model Year New Light-Duty Vehicles and New Light-Duty Trucks and New Otto-Cycle... for the EPA Urban Dynamometer Driving Schedule, US06, SC03, and the EPA New York City Cycles are...
40 CFR 86.115-00 - EPA dynamometer driving schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for 1977 and Later Model Year New Light-Duty Vehicles and New Light-Duty Trucks and New Otto-Cycle... for the EPA Urban Dynamometer Driving Schedule, US06, SC03, and the EPA New York City Cycles are...
40 CFR 86.115-00 - EPA dynamometer driving schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for 1977 and Later Model Year New Light-Duty Vehicles and New Light-Duty Trucks and New Otto-Cycle... for the EPA Urban Dynamometer Driving Schedule, US06, SC03, and the EPA New York City Cycles are...
40 CFR 86.115-00 - EPA dynamometer driving schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for 1977 and Later Model Year New Light-Duty Vehicles and New Light-Duty Trucks and New Otto-Cycle... for the EPA Urban Dynamometer Driving Schedule, US06, SC03, and the EPA New York City Cycles are...
Influence of sleep and meal schedules on performance peaks in competitive sprinters.
Javierre, C; Calvo, M; Díez, A; Garrido, E; Segura, R; Ventura, J L
1996-08-01
The influence of sleep and meal schedules on performance in short distance running was assessed in a group of 8 national-class competition male sprinters. They were tested on Saturdays for five consecutive weeks. On each testing day, the performance time for an 80 m sprint was registered on eight different occasions during days 1 and 4, on 9 occasions on days 2 and 5, and on 7 occasions on day 3. On control days (days 1 and 4) performance gradually improved during the morning up to 13:00 h, decreased at 15:00 h, and again improved thereafter, with a maximum peak performance at 19:00 h. On day 2, in which sleep/wake cycles and meal-times were advanced for two hours, and on day 3, in which timetables were delayed for two hours, maximum peak performance was observed at 17:00 h and 21:00 h, respectively. At the time of maximum peak performance on both days a statistically significant improvement was observed as compared with the control day (day 2, p < 0.01; day 3, p = 0.001). On day 5, in which only the sleep/wake cycle was advanced for two hours, performance in the afternoon and evening was similar to that recorded on days 1 and 4. We observed that easy manipulation of sleep and meal schedules would allow competitive sprinters to synchronize peak power output with the time of the athletic event, increasing the chances for improvement in performance.
Yamanaka, Yujiro; Hashimoto, Satoko; Tanahashi, Yusuke; Nishide, Shin-Ya; Honma, Sato; Honma, Ken-Ichi
2010-03-01
Effects of timed physical exercise were examined on the reentrainment of sleep-wake cycle and circadian rhythms to an 8-h phase-advanced sleep schedule. Seventeen male adults spent 12 days in a temporal isolation facility with dim light conditions (<10 lux). The sleep schedule was phase-advanced by 8 h from their habitual sleep times for 4 days, which was followed by a free-run session for 6 days, during which the subjects were deprived of time cues. During the shift schedule, the exercise group (n = 9) performed physical exercise with a bicycle ergometer in the early and middle waking period for 2 h each. The control group (n = 8) sat on a chair at those times. Their sleep-wake cycles were monitored every day by polysomnography and/or weight sensor equipped with a bed. The circadian rhythm in plasma melatonin was measured on the baseline day before phase shift: on the 4th day of shift schedule and the 5th day of free-run. As a result, the sleep-onset on the first day of free-run in the exercise group was significantly phase-advanced from that in the control and from the baseline. On the other hand, the circadian melatonin rhythm was significantly phase-delayed in the both groups, showing internal desynchronization of the circadian rhythms. The sleep-wake cycle resynchronized to the melatonin rhythm by either phase-advance or phase-delay shifts in the free-run session. These findings indicate that the reentrainment of the sleep-wake cycle to a phase-advanced schedule occurs independent of the circadian pacemaker and is accelerated by timed physical exercise.
Lacy, Ryan T; Strickland, Justin C; Feinstein, Max A; Robinson, Andrea M; Smith, Mark A
2016-09-01
Preclinical studies indicate that gonadal hormones are important determinants of drug self-administration. To date, little is known about the influence of sex and estrous cycle on drug self-administration in ecologically relevant social contexts. The objective of this study was to examine the role of sex and estrous cycle in a rat model during cocaine and heroin self-administration with male-female and female-female social dyads. Male and female virgin rats were trained to self-administer cocaine and heroin in operant conditioning chambers that permitted two rats to self-administer concurrently, but prevented physical contact. Experiment 1 examined cocaine self-administration on a progressive ratio schedule in male-female dyads. Experiments 2 and 3 examined heroin self-administration on a fixed ratio schedule in male-female dyads at constant and varying doses, respectively. Experiment 4 examined heroin self-administration in female-female dyads on a fixed ratio schedule. Cocaine-maintained breakpoints increased by ∼17 % in females during estrus, but remained consistent in males. Heroin self-administration decreased by ∼70 % during proestrus in females whether they were isolated, housed with males, or housed with females. Heroin self-administration was lower in males than females under some conditions and was not consistently associated with the responding of females. Cocaine and heroin self-administration is influenced by the estrous cycle in females when in the presence of a male partner. As a novel finding, these data illustrate that heroin self-administration is reduced in females during proestrus regardless of the social context tested. Finally, these data suggest that drug self-administration in males is only minimally influenced by the hormonal status of a female partner.
Lacy, Ryan T.; Strickland, Justin C.; Feinstein, Max A.; Robinson, Andrea M.; Smith, Mark A.
2017-01-01
Rationale Preclinical studies indicate that gonadal hormones are important determinants of drug self-administration. To date, little is known about the influence of sex and estrous cycle on drug self-administration in ecologically relevant social contexts. Objective Examine the role of sex and estrous cycle in a rat model during cocaine and heroin self-administration with male-female and female-female social dyads. Methods Male and female virgin rats were trained to self-administer cocaine and heroin in operant conditioning chambers that permitted two rats to self-administer concurrently but prevented physical contact. Experiment 1 examined cocaine self-administration on a progressive-ratio schedule in male-female dyads. Experiments 2 and 3 examined heroin self-administration on a fixed-ratio schedule in male-female dyads at constant and varying doses, respectively. Experiment 4 examined heroin self-administration in female-female dyads on a fixed-ratio schedule. Results Cocaine-maintained breakpoints increased by ~17% in females during estrus but remained consistent in males. Heroin self-administration decreased by ~70% during proestrus in females whether they were isolated, housed with males, or housed with females. Heroin self-administration was lower in males than females under some conditions and was not consistently associated with the responding of females. Conclusions Cocaine and heroin self-administration is influenced by the estrous cycle in females when in the presence of a male partner. As a novel finding, these data illustrate that heroin self-administration is reduced in females during proestrus regardless of the social context tested. Finally, these data suggest that drug self-administration in males is only minimally influenced by the hormonal status of a female partner. PMID:27370020
NASA Technical Reports Server (NTRS)
Sellereite, B. K.; Waterman, A. W.; Nelson, W. G.
1974-01-01
Polyimide second-stage rod seals were evaluated to determine their suitability for applications in space station environments. The 6.35-cm (2.5-in.)K-section seal was verified for thermal cycling operation between room temperature and 478 K (400 F) and for operation in a 133 micron PA(0.000001 mm Hg) vacuum environment. The test seal completed the scheduled 96 thermal cycles and 1438 hr in vacuum with external rod seal leakage well within the maximum allowable of two drops per 25 actuation cycles. At program completion, the seals showed no signs of structural degradation. Posttest inspection showed the seals retained a snug fit against the shaft and housing walls, indicating additional wear life capability. Evaluation of a molecular flow section during vacuum testing, to inhibit fluid loss through vaporization, showed it to be beneficial with MIL-H-5606, a petroleum-base fluid, in comparison with MIL-H-83282, a synthetic hydrocarbon-base fluid.
Validation of the Pulmonary Function System for Use on the International Space Station
NASA Technical Reports Server (NTRS)
McCleary, Frank A.; Moore, Alan D., Jr.; Hagan, R. Donald
2007-01-01
Aerobic deconditioning occurs during long duration space flight despite the use of exercise countermeasures (Convertino, 1996). As a part of International Space Station (ISS) medical operations, periodic tests designed to estimate aerobic capacity are performed to track changes in aerobic fitness and to determine the effectiveness of exercise countermeasures. These tests are performed prior to, during, and after missions of greater than 30 days in duration. Crewmembers selected for missions aboard the ISS perform a graded exercise test on a cycle ergometer approximately 270 days prior to their scheduled launch date in order to measure peak oxygen consumption (VO2PK) and peak heart rate (HRpk). Approximately 30 to 45 days prior to launch, crewmembers perform a submaximal cycle ergometer test at work rates set to elicit 25, 50 and 75% of their pre-flight VO2PK. This test, known as the Periodic Fitness Evaluation (PFE), serves as a baseline measure to which subsequent in-and post-flight exercise tests are compared. While onboard the ISS, crewmembers are normally scheduled to perform the PFE beginning with flight day (FD) 14 and every 30 days thereafter. The PFE is also conducted 5 and 30 days following flight. Using PFE data, aerobic fitness is estimated by quantifying the VO2 vs. HR relationship using linear regression and calculating the VO2 that would occur at the crewmember s previously measured HRpk. Currently, for data collected during flight, this technique assumes that the pre- vs. in-flight oxygen consumption per given cycle workload is similar. However, the validity of this assumption is based upon a sparse amount of data collected during the Skylab era (Michel, et al. 1977). The method of using heart rate and cycle ergometer work rates has been used to estimate aerobic fitness in normal gravity (Astrand and Ryhming, 1954; Lee, 1993). Due to spaceflight induced physiological alterations, such as shifts in extracellular fluid (e.g. plasma) volume, this method may not be valid during space flight. In addition, the ergometer onboard ISS is vibration-isolated and moves with the astronaut s application of force into the pedals. The effect of this movement on the VO2 of cycle exercise on ISS has not been quantified.
Effects of N-acetylcysteine and imipramine in a model of acute rhythm disruption in BALB/c mice.
Pilz, Luísa K; Trojan, Yasmine; Quiles, Caroline L; Benvenutti, Radharani; Melo, Gabriela; Levandovski, Rosa; Hidalgo, Maria Paz L; Elisabetsky, Elaine
2015-03-01
Circadian rhythm disturbances are among the risk factors for depression, but specific animal models are lacking. This study aimed to characterize the effects of acute rhythm disruption in mice and investigate the effects of imipramine and N-acetylcysteine (NAC) on rhythm disruption-induced changes. Mice were exposed to 12:12-hour followed by 10:10-hour light:dark cycles (LD); under the latter, mice were treated with saline, imipramine or NAC. Rhythms of rest/activity and temperature were assessed with actigraphs and iButtons, respectively. Hole-board and social preference tests were performed at the beginning of the experiment and again at the 8th 10:10 LD, when plasma corticosterone and IL-6 levels were also assessed. Actograms showed that the 10:10 LD schedule prevents the entrainment of temperature and activity rhythms for at least 13 cycles. Subsequent light regimen change activity and temperature amplitudes showed similar patterns of decline followed by recovery attempts. During the 10:10 LD schedule, activity and temperature amplitudes were significantly decreased (paired t test), an effect exacerbated by imipramine (ANOVA/SNK). The 10:10 LD schedule increased anxiety (paired t test), an effect prevented by NAC (30 mg/kg). This study identified mild but significant behavioral changes at specific time points after light regimen change. We suggest that if repeated overtime, these subtle changes may contribute to lasting behavioral disturbancess relevant to anxiety and mood disorders. Data suggest that imipramine may contribute to sustained rhythm disturbances, while NAC appears to prevent rhythm disruption-induced anxiety. Associations between sleep/circadian disturbances and the recurrence of depressive episodes underscore the relevance of potential drug-induced maintenance of disturbed rhythms.
Flat Tile Armour Cooled by Hypervapotron Tube: a Possible Technology for ITER
NASA Astrophysics Data System (ADS)
Schlosser, J.; Escourbiac, F.; Merola, M.; Schedler, B.; Bayetti, P.; Missirlian, M.; Mitteau, R.; Robin-Vastra, I.
Carbon fibre composite (CFC) flat tile armours for actively cooled plasma facing components (PFC’s) are an important challenge for controlled fusion machines. Flat tile concepts, water cooled by tubes, were studied, developed, tested and finally operated with success in Tore Supra. The components were designed for 10 MW/m2 and mock-ups were successfully fatigue tested at 15 MW/m2, 1000 cycles. For ITER, a tube-in-tile concept was developed and mock-ups sustained up to 25 MW/m2 for 1000 cycles without failure. Recently flat tile armoured mock-ups cooled by a hypervapotron tube successfully sustained a cascade failure test under a mean heat flux of 10 MW/m2 but with a doubling of the heat flux on some tiles to simulate missing tiles (500 cycles). This encouraging results lead to reconsider the limits for flat tile concept when cooled by hypervapotron (HV) tube. New tests are now scheduled to investigate these limits in regard to the ITER requirements. Experimental evidence of the concept could be gained in Tore Supra by installing a new limiter into the machine.
NASA Technical Reports Server (NTRS)
Nelson, Karl W.; McArthur, Craig; Leopard, Larry (Technical Monitor)
2000-01-01
This presentation reviews the activities of the Advanced Space Transportation Program (ASTP) in the development of Rocket-Based Combined Cycle (RBCC)technology. The document consist of the presentation slides for a talk scheduled to be given to the World Aviation Congress and Exhibit of SAE. Included in the review is discussion of recent accomplishments in the area of Advanced Reusable technologies (ART), which includes work in flowpath testing, and system studies of the various vehicle/engine combinations including RBCC, Turbine Based Combined Cycle (TBCC) and Pulsed Detonation Engine (PDE). Pictures of the proposed RBCC Flowpaths are included. The next steps in the development process are reviewed.
Deep reconditioning of batteries during DSCS 3 flight operations
NASA Technical Reports Server (NTRS)
Thierfelder, H. E.; Stearns, R. J.; Jones, P. W.
1985-01-01
Deep reconditioning of batteries is defined as discharge below the 1.0 volt/cell level to a value of about 1.0 volt/battery. This type of reconditioning was investigated for use on the Defense Satellite Communications System (DSCS) spacecraft, and has been used during the first year of orbital operation. Prior to launch of the spacecraft, the deep reconditioning was used during the battery life test, which has now complete fourteen eclipse periods. Reconditioning was performed prior to each eclipse period of the life test, and is scheduled to be used prior to each eclipse period in orbit. The battery data for discharge and recharge is presented for one of the life test reconditioning cycles, and for each of the three batteries during the reconditioning cycles between eclipse period no.1 and eclipse period no.2 in Earth orbit.
Environmental qualification testing of payload G-534, the Pool Boiling Experiment
NASA Technical Reports Server (NTRS)
Sexton, J. Andrew
1992-01-01
Payload G-534, the prototype Pool Boiling Experiment (PBE), is scheduled to fly on the STS-47 mission in September 1992. This paper describes the purpose of the experiment and the environmental qualification testing program that was used to prove the integrity of the hardware. Component and box level vibration and thermal cycling tests were performed to give an early level of confidence in the hardware designs. At the system level, vibration, thermal extreme soaks, and thermal vacuum cycling tests were performed to qualify the complete design for the expected shuttle environment. The system level vibration testing included three axis sine sweeps and random inputs. The system level hot and cold soak tests demonstrated the hardware's capability to operate over a wide range of temperatures and gave wider latitude in determining which shuttle thermal attitudes were compatible with the experiment. The system level thermal vacuum cycling tests demonstrated the hardware's capability to operate in a convection free environment. A unique environmental chamber was designed and fabricated by the PBE team and allowed most of the environmental testing to be performed within the hardware build laboratory. The completion of the test program gave the project team high confidence in the hardware's ability to function as designed during flight.
DOT National Transportation Integrated Search
1995-05-01
Air Traffic Control Specialists (ATCS) work rotating shift schedules for most of their careers. Specifically, many work a counterclockwise rotating shift schedule, called the 2-2-1, or some variation of the schedule. The 2-2-1 involves rotating from ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoddard, Larry; Galluzzo, Geoff; Andrew, Daniel
The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO hasmore » a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and 30 percent further reductions by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO 2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. This report addresses the concept definition of the sCO2 power generation system, a sub-set of items 2 and 3 above. Other reports address the balance of items 1 to 3 above as well as the MS/sCO2 integrated 10MWe facility, Item 2.« less
Molten Salt: Concept Definition and Capital Cost Estimate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoddard, Larry; Andrew, Daniel; Adams, Shannon
The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO hasmore » a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO 2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO 2 cycle generating approximately 10MWe. This report addresses the concept definition of the MS/sCO2 integrated 10MWe facility, Item No. 2 above. Other reports address Items No. 1 and No. 3 above.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Horst; Purgert, Robert Michael
Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increasemore » cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760°C). The steam turbine stop and control valve component has been designed to operate at full A-USC temperatures, and would be tested both in throttling operation and to accumulate accelerated, repetitive stroke cycles. A cycling header component has been designed to confirm the suitability of new high-temperature nickel alloys to cycling operation, expected of future coal-fired power plants. Current test plans would subject these components to A-USC operating conditions for at least 8,000 hours by September 2020. The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. This consortium is completing the Detailed Engineering phase of the project, with procurement scheduled to begin in late 2017. The effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory, along with the Ohio Development Services Agency. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides technical details on the design of the ComTest facility.« less
Nickel-hydrogen LEO cycling at 20-50 percent DOD. [depth of discharge
NASA Technical Reports Server (NTRS)
Lowery, John E.; Mai, Jenny
1991-01-01
Two NiH2 two-cell packs made up of engineering cells built according to the Hubble Space Telescope design (EPI RNH 90-3) are currently being low-earth-orbit (LEO) cycled at 20-50 percent depth of discharge (DOD). The cells were manufactured by Eagle-Picher Industries, Inc., and activated with electrolyte (KOH) concentrations of 26 percent (pack No.1) and 31 percent (pack No.2), for use during evaluation of the HST cell design. The cells have been grouped according to electrolyte concentration but follow the same test schedule for comparison. This test was set up to study the behavior of NiH2 cells having differing electrolyte concentrations, when operated at relatively high DOD (20-50 percent) in a LEO cycling program. The test was designed specifically to allow the cells to pick their own recharge ratio for varying DOD and varying EOC (end of charge) voltages. The cells are being cycled in a simulated 96-min orbit with 60-min charge and 36-min discharge where an EOC cutoff voltage controls high-rate charging. EOC cutoff voltages vary between 1.48 V and 1.56 V.
Ion thruster system (8-cm) cyclic endurance test
NASA Technical Reports Server (NTRS)
Dulgeroff, C. R.; Beattie, J. R.; Poeschel, R. L.; Hyman, J., Jr.
1984-01-01
This report describes the qualification test of an Engineering-Model 5-mN-thrust 8-cm-diameter mercury ion thruster which is representative of the Ion Auxiliary Propulsion System (IAPS) thrusters. Two of these thrusters are scheduled for future flight test. The cyclic endurance test described herein was a ground-based test performed in a vacuum facility with a liquid-nitrogen-cooled cryo-surface and a frozen mercury target. The Power Electronics Unit, Beam Shield, Gimal, and Propellant Tank that were used with the thruster in the endurance test are also similar to those of the IAPS. The IAPS thruster that will undergo the longest beam-on-time during the actual space test will be subjected to 7,055 hours of beam-on-time and 2,557 cycles during the flight test. The endurance test was successfully concluded when the mercury in the IAPS Propellant Tank was consumed. At that time, 8,471 hours of beam-on-time and 599 cycles had been accumulated. Subsequent post-test-evaluation operations were performed (without breaking vacuum) which extended the test values to 652 cycles and 9,489 hours of beam-on-time. The Power Electronic Unit (PEU) and thruster were in the same vacuum chamber throughout the test. The PEU accumulated 10,268 hr of test time with high voltage applied to the operating thruster or dummy load.
Mansour, Diana; Westhoff, Carolyn; Kher, Uma; Korver, Tjeerd
2017-04-01
To obtain more precise and detailed information regarding the bleeding patterns of nomegestrol acetate (NOMAC)/17β-estradiol (E2) and drospirenone/ethinyl estradiol (DRSP/EE) and to identify whether baseline demographic characteristics were associated with unscheduled bleeding, absent scheduled bleeding, or amenorrhea. This analysis pooled results from two pivotal open-label, randomized trials that compared bleeding patterns of NOMAC/E2 and DRSP/EE. In the two studies 4317 women aged 18-50 years from 24 countries across the Americas, Europe, and Asia underwent treatment. 2835 women taking NOMAC/E2 (2.5 mg/1.5 mg) in a 24/4-day regimen and 938 women taking DRSP/EE (3 mg/30 μg) in a 21/7-day regimen had at least 1 evaluable cycle for vaginal bleeding analyses. The frequency of absent scheduled bleeding was higher (p<.0001) for women using NOMAC/E2 than DRSP/EE across all 11 cycles (cycles 2-12), ranging between 17.6% and 31.6% and between 3.4% and 5.8%, respectively. For women who had absent scheduled bleeding in cycles 2, 3, or 4 the incidence of absent scheduled bleeding in subsequent cycles was high and ranged between approximately 50%-60% for NOMAC/E2 and approximately 40%-50% for DRSP/EE. Amenorrhea increased over time with both regimens, being higher with NOMAC/E2. Both absent scheduled bleeding and amenorrhea with NOMAC/E2 were more common in older women, overweight women, switchers, and smokers; unscheduled bleeding was more common in starters, but had no association with age, body mass index, and smoking. NOMAC/E2 is associated with a higher prevalence of absent scheduled bleeding compared with DRSP/EE. Absent scheduled bleeding and amenorrhea were associated with age, body weight, switching and smoking. Unscheduled bleeding was more common in starters. Information about the factors associated with bleeding patterns may help clinicians provide guidance to women considering use of the NOMAC/E2 oral contraceptive. Copyright © 2016 Elsevier Inc. All rights reserved.
Improving HVAC operational efficiency in small-and medium-size commercial buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Woohyun; Katipamula, Srinivas; Lutes, Robert
Small- and medium-size (<100,000 sf) commercial buildings (SMBs) represent over 95% of the U.S. commercial building stock and consume over 60% of total site energy consumption. Many of these buildings use rudimentary controls that are mostly manual, with limited scheduling capability, no monitoring, or failure management. Therefore, many of these buildings are operated inefficiently and consume excess energy. SMBs typically use packaged rooftop units (RTUs) that are controlled by an individual thermostat. There is increased urgency to improve the operating efficiency of existing commercial building stock in the United States for many reasons, chief among them being to mitigate themore » climate change impacts. Studies have shown that managing set points and schedules of the RTUs will result in up to 20% energy and cost savings. Another problem associated with RTUs is short cycling, when an RTU goes through ON and OFF cycles too frequently. Excessive cycling can lead to excessive wear and to premature failure of the compressor or its components. Also, short cycling can result in a significantly decreased average efficiency (up to 10%), even if there are no physical failures in the equipment. Ensuring correct use of the zone set points and eliminating frequent cycling of RTUs thereby leading to persistent building operations can significantly increase the operational efficiency of the SMBs. A growing trend is to use low-cost control infrastructure that can enable scalable and cost-effective intelligent building operations. The work reported in this paper describes two algorithms for detecting the zone set point temperature and RTU cycling rate that can be deployed on the low-cost infrastructure. These algorithms only require the zone temperature data for detection. The algorithms have been tested and validated using field data from a number of RTUs from six buildings in different climate locations. Overall, the algorithms were successful in detecting the set points and ON/OFF cycles accurately using the peak detection technique. The paper describes the two algorithms, results from testing the algorithms using field data, how the algorithms can be used to improve SMBs efficiency, and presents related conclusions.« less
User manual for NASA Lewis 10 by 10 foot supersonic wind tunnel. Revised
NASA Technical Reports Server (NTRS)
Soeder, Ronald H.
1995-01-01
This manual describes the 10- by 10-Foot Supersonic Wind Tunnel at the NASA Lewis Research Center and provides information for users who wish to conduct experiments in this facility. Tunnel performance operating envelopes of altitude, dynamic pressure, Reynolds number, total pressure, and total temperature as a function of test section Mach number are presented. Operating envelopes are shown for both the aerodynamic (closed) cycle and the propulsion (open) cycle. The tunnel test section Mach number range is 2.0 to 3.5. General support systems, such as air systems, hydraulic system, hydrogen system, fuel system, and Schlieren system, are described. Instrumentation and data processing and acquisition systems are also described. Pretest meeting formats and schedules are outlined. Tunnel user responsibility and personnel safety are also discussed.
Baseline tests of the power-train electric delivery van
NASA Technical Reports Server (NTRS)
Lumannick, S.; Dustin, M. O.; Bozek, J. M.
1977-01-01
Vehicle maximum speed, range at constant speed, range over stop-and-go driving schedules, maximum acceleration, gradeability, gradeability limit, road energy consumption, road power, indicated energy consumption, braking capability, battery charger efficiency, and battery characteristics were determined for a modified utility van powered by sixteen 6-volt batteries connected in series. A chopper controller actuated by a foot accelerator pedal changes the voltage applied to the 22-kilowatt (30-hp) series-wound drive motor. In addition to the conventional hydraulic braking system, the vehicle has hydraulic regenerative braking. Cycle tests and acceleration tests were conducted with and without hydraulic regeneration.
NASA Astrophysics Data System (ADS)
Gourash, F.
1984-02-01
The test results for a functional model ac motor controller for electric vehicles and a three-phase induction motor which were dynamically tested on the Lewis Research Center road load simulator are presented. Results show that the controller has the capability to meet the SAE-J227a D cycle test schedule and to accelerate a 1576-kg (3456-lb) simulated vehicle to a cruise speed of 88.5 km/hr (55 mph). Combined motor controller efficiency is 72 percent and the power inverter efficiency alone is 89 percent for the cruise region of the D cycle. Steady state test results for motoring, regeneration, and thermal data obtained by operating the simulator as a conventional dynamometer are in agreement with the contractor's previously reported data. The regeneration test results indicate that a reduction in energy requirements for urban driving cycles is attainable with regenerative braking. Test results and data in this report serve as a data base for further development of ac motor controllers and propulsion systems for electric vehicles. The controller uses state-of-the-art silicon controlled rectifier (SCR) power semiconductors and microprocessor-based logic and control circuitry. The controller was developed by Gould Laboratories under a Lewis contract for the Department of Energy's Electric and Hybrid Vehicle program.
NASA Technical Reports Server (NTRS)
Gourash, F.
1984-01-01
The test results for a functional model ac motor controller for electric vehicles and a three-phase induction motor which were dynamically tested on the Lewis Research Center road load simulator are presented. Results show that the controller has the capability to meet the SAE-J227a D cycle test schedule and to accelerate a 1576-kg (3456-lb) simulated vehicle to a cruise speed of 88.5 km/hr (55 mph). Combined motor controller efficiency is 72 percent and the power inverter efficiency alone is 89 percent for the cruise region of the D cycle. Steady state test results for motoring, regeneration, and thermal data obtained by operating the simulator as a conventional dynamometer are in agreement with the contractor's previously reported data. The regeneration test results indicate that a reduction in energy requirements for urban driving cycles is attainable with regenerative braking. Test results and data in this report serve as a data base for further development of ac motor controllers and propulsion systems for electric vehicles. The controller uses state-of-the-art silicon controlled rectifier (SCR) power semiconductors and microprocessor-based logic and control circuitry. The controller was developed by Gould Laboratories under a Lewis contract for the Department of Energy's Electric and Hybrid Vehicle program.
Sleep and performance in simulated Navy watch schedules.
Skornyakov, Elena; Shattuck, Nita L; Winser, Michael A; Matsangas, Panagiotis; Sparrow, Amy R; Layton, Matthew E; Gabehart, Rylie J; Van Dongen, Hans P A
2017-02-01
To operate Navy ships 24h per day, watchstanding is needed around the clock, with watch periods reflecting a variety of rotating or fixed shift schedules. The 5/15 watch schedule cycles through watch periods with 5h on, 15h off watch, such that watches occur 4h earlier on the clock each day - that is, the watches rotate backward. The timing of sleep varies over 4-day cycles, and sleep is split on some days to accommodate nighttime watchstanding. The 3/9 watch schedule cycles through watch periods with 3h on, 9h off watch, allowing for consistent sleep timing over days. In some sections of the 3/9 watch schedule, sleep may need to be split to accommodate nighttime watchstanding. In both the 5/15 and 3/9 watch schedules, four watch sections alternate to cover the 24h of the day. Here we compared sleep duration, psychomotor vigilance and subjective sleepiness in simulated sections of the 5/15 and 3/9 watch schedules. Fifteen healthy male subjects spent 6 consecutive days (5 nights) in the laboratory. Sleep opportunities were restricted to an average of 6.5h daily. Actigraphically estimated sleep duration was 5.6h per watch day on average, with no significant difference between watch sections. Sleep duration was not reduced when sleep opportunities were split. Psychomotor vigilance degraded over watch days, and tended to be more variable in the 5/15 than in the 3/9 watch sections. These laboratory-based findings suggest that Navy watch schedules are associated with cumulative sleep loss and a build-up of fatigue across days. The fixed watch periods of the 3/9 watch schedule appear to yield more stable performance than the backward rotating watch periods of the 5/15 watch schedule. Optimal performance may require longer and more consistent daily opportunities for sleep than are typically obtained in Navy operations. Copyright © 2015 Elsevier Ltd. All rights reserved.
Magoon, Michael A; Critchfield, Thomas S; Merrill, Dustin; Newland, M Christopher; Schneider, W Joel
2017-01-01
Although theoretical discussions typically assume that positive and negative reinforcement differ, the literature contains little unambiguous evidence that they produce differential behavioral effects. To test whether the two types of consequences control behavior differently, we pitted money-gain positive reinforcement and money-loss-avoidance negative reinforcement, scheduled through identically programmed variable-cycle schedules, against each other in concurrent schedules. Contingencies of response-produced feedback, normally different in positive and negative reinforcement, were made symmetrical. Steeper matching slopes were produced compared to a baseline consisting of all positive reinforcement. This free-operant differential outcomes effect supports the notion that that stimulus-presentation positive reinforcement and stimulus-elimination negative reinforcement are functionally "different." However, a control experiment showed that the feedback asymmetry of more traditional positive and negative reinforcement schedules also is sufficient to create a "difference" when the type of consequence is held constant. We offer these findings as a small step in meeting the very large challenge of moving negative reinforcement theory beyond decades of relative quiescence. © 2017 Society for the Experimental Analysis of Behavior.
Systematic Approach to Better Understanding Integration Costs: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stark, Gregory B.
2015-09-28
When someone mentions integration costs, thoughts of the costs of integrating renewable generation into an existing system come to mind. We think about how variability and uncertainty can increase power system cycling costs as increasing amounts of wind or solar generation are incorporated into the generation mix. However, seldom do we think about what happens to system costs when new baseload generation is added to an existing system or when generation self-schedules. What happens when a highly flexible combined-cycle plant is added? Do system costs go up, or do they go down? Are other, non-cycling, maintenance costs impacted? In thismore » paper we investigate six technologies and operating practices--including VG, baseload generation, generation mix, gas prices, self-scheduling, and fast-start generation--and how changes in these areas can impact a system's operating costs. This paper provides a working definition of integration costs and four components of variable costs. It describes the study approach and how a production cost modeling-based method was used to determine the cost effects, and, as a part of the study approach section, it describes the test system and data used for the comparisons. Finally, it presents the research findings, and, in closing, suggests three areas for future work.« less
NASA Technical Reports Server (NTRS)
Marsh, Matt; Cowan, Penny
1994-01-01
Turbomachinery used in liquid rocket engines typically are composed of complex geometries made from high strength-to-weight super alloys and have long design and fabrication cycle times (3 to 5 years). A simple, low-cost turbopump is being designed in-house to demonstrate the ability to reduce the overall cost to $500K and compress life cycle time to 18 months. The simplex turbopump was designed to provide a discharge pressure of 1500 psia of liquid oxygen at 90 lbm/s. The turbine will be powered by gaseous oxygen. This eliminates the need for an inter-propellant seal typically required to separate the fuel-rich turbine gases from the liquid oxygen pump components. Materials used in the turbine flow paths will utilize existing characterized metals at 800 deg R that are compatible with a warm oxygen environment. This turbopump design would be suitable for integration with a 40 K pound thrust hybrid motor that provides warm oxygen from a tapped-off location to power the turbine. The preliminary and detailed analysis was completed in a year by a multiple discipline, concurrent engineering team. Manpower, schedule, and cost data were tracked during the process for a comparison to the initial goal. The Simplex hardware is the procurement cycle with the expectation of the first test to occur approximately 1.5 months behind the original schedule goal.
Ocampo Rebollar, Ana; Menéndez Balaña, Francisco J; Conde Pastor, Montserrat
2017-04-01
Studies about affect changes during the menstrual cycle and the role of hormones in these changes have yielded contradictory results. Often research has focused on the pre-menstrual phase, with few studies paying specific attention to the affect changes around ovulation. In this research thirty women completed a daily questionnaire measuring the positive and negative affect during their menstrual cycle. These women were divided in two groups: hormonally-contracepting and naturally-cycling. The Positive and Negative Affect Schedule was used to measure the affect. A Digital Ovulation Test was used to determine the day of ovulation in the participants not taking hormonal contraceptives by measuring the Luteinizing Hormone peak. The differences in positive affect (PA) and negative affect (NA) between groups were examined. The results indicate that during the ovulatory phase, PA scores are significantly higher in naturally-cycling women than hormonally-contracepting women.
Life Cycle Testing of Viscoelastic Material for Hubble Space Telescope Solar Array 3 Damper
NASA Technical Reports Server (NTRS)
Maly, Joseph R.; Reed, Benjamin B.; Viens, Michael J.; Parker, Bradford H.; Pendleton, Scott C.
2003-01-01
During the March 2002 Servicing Mission by Space Shuttle (STS 109), the Hubble Space Telescope (HST) was refurbished with two new solar arrays that now provide all of its power. These arrays were built with viscoelastic/titanium dampers, integral to the supporting masts, which reduce the interaction of the wing bending modes with the Telescope. Damping of over 3% of critical was achieved. To assess the damper s ability to maintain nominal performance over the 10-year on-orbit design goal, material specimens were subjected to an accelerated life test. The test matrix consisted of scheduled events to expose the specimens to pre-determined combinations of temperatures, frequencies, displacement levels, and numbers of cycles. These exposure events were designed to replicate the life environment of the damper from fabrication through testing to launch and life on-orbit. To determine whether material degradation occurred during the exposure sequence, material performance was evaluated before and after the accelerated aging with complex stiffness measurements. Based on comparison of pre- and post-life-cycle measurements, the material is expected to maintain nominal performance through end of life on-orbit. Recent telemetry from the Telescope indicates that the dampers are performing nominally.
Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules
2015-06-01
additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of
Endogenous circadian rhythm in vasovagal response to head-up tilt
Hu, Kun; Scheer, Frank AJL; Laker, Michael; Smales, Carolina; Shea, Steven A
2011-01-01
Background The incidence of syncope exhibits a daily pattern with more occurrences in the morning, possibly due to influences from the endogenous circadian system and/or the daily pattern of behavioral/emotional stimuli. This study tested the hypothesis that the circadian system modulates cardiovascular responses to postural stress, leading to increased susceptibility to syncope at specific times of day. Methods and Results Twelve subjects underwent a 13-day in-laboratory protocol, in which subjects’ sleep-wake cycles were adjusted to 20 hours for 12 cycles. A 15-minute title-table test (60° head-up) was performed ~4.5 hours after scheduled awakening in each cycle so that twelve tests in each subject were distributed evenly across the circadian cycle. Out of 144 tests, signs/symptoms of presyncope were observed in 21 tests in 6 subjects. These presyncope events displayed a clear circadian rhythm (P=0.028) with 17 cases (81%) in the circadian phase range corresponding to ~22:30-10:30 (4.25 times of the probability from the other half of the circadian cycle). Significant circadian rhythms were also observed in hemodynamic and autonomic function markers (blood pressure, heart rate, epinephrine, norepinephrine, and indices of cardiac vagal tone) that may underlie the circadian rhythm of presyncope susceptibility. Conclusion The circadian system affects cardiovascular responses to postural stressors resulting in greater susceptibility to presyncope during the biological night. This finding suggests that night-shift workers and people with disrupted sleep at night may have great risk of syncope due to their exposure to postural stressors during the biological night. PMID:21339480
Bessho, Kazuhiro; Iwasa, Yoh
2010-11-21
Marine macroalgae (seaweed) show diverse life cycles. Species with a heteromorphic life cycle have a large multicellular algal body in one generation but have a very small body in the second generation of the same year. In contrast, the diploid and haploid life forms of isomorphic species have similar morphology, and these species often have more than two generations in a year. Here, we first study the optimal life cycle schedule of marine macroalgae when daily mortality changes seasonally, and then we discuss the conditions for coexistence and relative dominance of different life cycles. According to the optimal life cycle schedule, heteromorphic species tend to have a generation with a large algal body when mortality is low, and a microscopic-sized generation when mortality is high. In contrast, isomorphic species tend to mature when body size reaches a threshold value that is the same for different generations. We then examine the coexistence of the two life cycles when growth rate decreases with biomass. The model predicts that (1) at high latitudes (i.e., in strongly seasonal environments), heteromorphic species are likely to dominate over isomorphic species, and (2) species with a heteromorphic life cycle should dominate in the supratidal and upper intertidal zones where macroalgae tend to suffer high mortality, and also in the subtidal zone, where mortality is low, whereas isomorphic species are likely to be more successful when mortality is intermediate. These predictions are consistent with the observed distribution patterns of the two life cycles in macroalgae. Copyright © 2010 Elsevier Ltd. All rights reserved.
Cell cycle-tailored targeting of metastatic melanoma: Challenges and opportunities.
Haass, Nikolas K; Gabrielli, Brian
2017-07-01
The advent of targeted therapies of metastatic melanoma, such as MAPK pathway inhibitors and immune checkpoint antagonists, has turned dermato-oncology from the "bad guy" to the "poster child" in oncology. Current targeted therapies are effective, although here is a clear need to develop combination therapies to delay the onset of resistance. Many antimelanoma drugs impact on the cell cycle but are also dependent on certain cell cycle phases resulting in cell cycle phase-specific drug insensitivity. Here, we raise the question: Have combination trials been abandoned prematurely as ineffective possibly only because drug scheduling was not optimized? Firstly, if both drugs of a combination hit targets in the same melanoma cell, cell cycle-mediated drug insensitivity should be taken into account when planning combination therapies, timing of dosing schedules and choice of drug therapies in solid tumors. Secondly, if the combination is designed to target different tumor cell subpopulations of a heterogeneous tumor, one drug effective in a particular subpopulation should not negatively impact on the other drug targeting another subpopulation. In addition to the role of cell cycle stage and progression on standard chemotherapeutics and targeted drugs, we discuss the utilization of cell cycle checkpoint control defects to enhance chemotherapeutic responses or as targets themselves. We propose that cell cycle-tailored targeting of metastatic melanoma could further improve therapy outcomes and that our real-time cell cycle imaging 3D melanoma spheroid model could be utilized as a tool to measure and design drug scheduling approaches. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Advanced nickel-hydrogen spacecraft battery development
NASA Technical Reports Server (NTRS)
Coates, Dwaine K.; Fox, Chris L.; Standlee, D. J.; Grindstaff, B. K.
1994-01-01
Eagle-Picher currently has several advanced nickel-hydrogen (NiH2) cell component and battery designs under development including common pressure vessel (CPV), single pressure vessel (SPV), and dependent pressure vessel (DPV) designs. A CPV NiH2 battery, utilizing low-cost 64 mm (2.5 in.) cell diameter technology, has been designed and built for multiple smallsat programs, including the TUBSAT B spacecraft which is currently scheduled (24 Nov. 93) for launch aboard a Russian Proton rocket. An advanced 90 mm (3.5 in.) NiH2 cell design is currently being manufactured for the Space Station Freedom program. Prototype 254 mm (10 in.) diameter SPV batteries are currently under construction and initial boilerplate testing has shown excellent results. NiH2 cycle life testing is being continued at Eagle-Picher and IPV cells have currently completed more than 89,000 accelerated LEO cycles at 15% DOD, 49,000 real-time LEO cycles at 30 percent DOD, 37,800 cycles under a real-time LEO profile, 30 eclipse seasons in accelerated GEO, and 6 eclipse seasons in real-time GEO testing at 75 percent DOD maximum. Nickel-metal hydride battery development is continuing for both aerospace and electric vehicle applications. Eagle-Picher has also developed an extensive range of battery evaluation, test, and analysis (BETA) measurement and control equipment and software, based on Hewlett-Packard computerized data acquisition/control hardware.
Bossert, Jennifer M; Hoots, Jennifer K; Fredriksson, Ida; Adhikary, Sweta; Zhang, Michelle; Venniro, Marco; Shaham, Yavin
2018-05-19
Relapse to nonmedical use of prescription opioids often occurs after exposure to places previously associated with drug use. Here, we describe a rat model of context-induced reinstatement of oxycodone seeking after repeated cycles of drug self-administration and extinction-induced abstinence. We also determined the role of mu, delta, and kappa opioid receptors (MOR, DOR, KOR) in this reinstatement. We trained rats to self-administer oxycodone for 6 h/d in Context A; lever pressing was paired with a discrete cue. Next, we extinguished the lever pressing in the presence of the discrete cue in Context B and then tested the rats for reinstatement of oxycodone seeking in both contexts. We retrained rats to self-administer oxycodone in Context A, re-extinguished their lever pressing in Context B, and retested them for reinstatement in both contexts. Prior to testing, we injected the rats with vehicle or antagonists of MOR (naltrexone; 0.5 or 1.0 mg/kg), DOR (naltrindole; 7.5 or 15 mg/kg), or KOR (LY2456302; 5 or 10 mg/kg). We also tested the effect of naltrexone, naltrindole, and LY2456302 on oxycodone self-administration under fixed-ratio-1 (FR1) and progressive-ratio (PR) reinforcement schedules. We observed context-induced reinstatement of oxycodone seeking after repeated cycles of drug self-administration and extinction. Naltrexone, but not naltrindole or LY2456302, injections decreased this reinstatement. Additionally, naltrexone increased oxycodone self-administration under the FR1 schedule and decreased oxycodone self-administration under the PR schedule; naltrindole and LY2456302 were ineffective. Results demonstrate a critical role of MOR, but not DOR or KOR, in context-induced reinstatement of oxycodone seeking and oxycodone self-administration. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.
Revenue cycle management, Part II.
Crew, Matt
2007-01-01
The proper management of your revenue cycle requires the application of "best practices" and the continual monitoring and measuring of the entire cycle. The correct technology will enable you to gain the insight and efficiencies needed in the ever-changing healthcare economy. The revenue cycle is a process that begins when you negotiate payor contracts, set fees, and schedule appointments and continues until claims are paid in full. Every single step in the cycle carries equal importance. Monitoring all phases and a commitment to continually communicating the results will allow you to achieve unparalleled success. In part I of this article, we explored the importance of contracting, scheduling, and case management as well as coding and clinical documentation. We will now take a closer look at the benefits charge capture, claim submission, payment posting, accounts receivable follow-up, and reporting can mean to your practice.
Garrett solar Brayton engine/generator status
NASA Astrophysics Data System (ADS)
Anson, B.
1982-07-01
The solar advanced gas turbine (SAGT-1) is being developed by the Garrett Turbine Engine Company, for use in a Brayton cycle power conversion module. The engine is derived from the advanced gas turbine (AGT101) now being developd by Garrett and Ford Motor Company for automotive use. The SAGT Program is presently funded for the design, fabrication and test of one engine at Garrett's Phoenix facility. The engine when mated with a solar receiver is called a power conversion module (PCU). The PCU is scheduled to be tested on JPL's test bed concentrator under a follow on phase of the program. Approximately 20 kw of electrical power will be generated.
Intelligent Scheduling for Underground Mobile Mining Equipment.
Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John
2015-01-01
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.
NASA Astrophysics Data System (ADS)
1981-09-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
NASA Technical Reports Server (NTRS)
1981-01-01
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
Graphs of Soil Mechanics Tests in Orbit
NASA Technical Reports Server (NTRS)
1998-01-01
On STS-89, three Mechanics of Granular Materials (MGM) test cells were subjected to five cycles of compression and relief (left) and three were subjected to shorter displacement cycles that simulate motion during an earthquake (right). In the compression/relief tests, the sand particles rearranged themselves and slightly re-expanded the column during relief. In the short displacement tests, the specimen's resistance to compression decreases, even though the displacement remains the same. The specimens were cycled up to 100 times or until the resistive force was less than 1% that of the previous cycle. Sand and soil grains have faces that can cause friction as they roll and slide against each other, or even cause sticking and form small voids between grains. This complex behavior can cause soil to behave like a liquid under certain conditions such as earthquakes or when powders are handled in industrial processes. Mechanics of Granular Materials (MGM) experiments aboard the Space Shuttle use the microgravity of space to simulate this behavior under conditons that carnot be achieved in laboratory tests on Earth. MGM is shedding light on the behavior of fine-grain materials under low effective stresses. Applications include earthquake engineering, granular flow technologies (such as powder feed systems for pharmaceuticals and fertilizers), and terrestrial and planetary geology. Nine MGM specimens have flown on two Space Shuttle flights. Another three are scheduled to fly on STS-107. The principal investigator is Stein Sture of the University of Colorado at Boulder. Credit: NASA/Marshall Space Flight Center (MSFC)
... is scheduled at a time in your menstrual cycle after your period has stopped but before ovulation . ... form in the muscle of the uterus. Menstrual Cycle: The monthly process of changes that occur to ...
Aerospace nickel-cadmium cell separator qualifications program
NASA Technical Reports Server (NTRS)
Francis, R. W.; Haag, R. L.
1986-01-01
The present space qualified nylon separator, Pellon 2505 ML, is no longer available for aerospace nickel-cadmium (NiCd) cells. As a result of this anticipated unavailability, a joint Government program between the Air Force Space Division and the Naval Research Laboratory was established. Four cell types were procured with both the old qualified and the new unqualified separators. Acceptance, characterization, and life cycling tests are to be performed at the Naval Weapons Support Center, Crane, Ind. (NWSC/Crane). The scheduling and current status of this program are discussed and the progress of testing and available results are projected.
A novel multi-item joint replenishment problem considering multiple type discounts.
Cui, Ligang; Zhang, Yajun; Deng, Jie; Xu, Maozeng
2018-01-01
In business replenishment, discount offers of multi-item may either provide different discount schedules with a single discount type, or provide schedules with multiple discount types. The paper investigates the joint effects of multiple discount schemes on the decisions of multi-item joint replenishment. In this paper, a joint replenishment problem (JRP) model, considering three discount (all-unit discount, incremental discount, total volume discount) offers simultaneously, is constructed to determine the basic cycle time and joint replenishment frequencies of multi-item. To solve the proposed problem, a heuristic algorithm is proposed to find the optimal solutions and the corresponding total cost of the JRP model. Numerical experiment is performed to test the algorithm and the computational results of JRPs under different discount combinations show different significance in the replenishment cost reduction.
Development of the ECOSAR P-Band Synthetic Aperture Radar
NASA Technical Reports Server (NTRS)
Rincon, R. F.; Fatoyinbo, T.; Ranson, K. J.; Sun, G.; Deshpande, M.; Hale, R. D.; Bhat, A.; Perrine, M.; DuToit, C. F.; Bonds, Q.;
2012-01-01
This paper describes objectives and recent progress on the development of the EcoSAR, a new P-band airborne radar instrument being developed at the NASA/ Goddard Space Flight Center (GSFC) for the polarimetric and interferometric measurements of ecosystem structure and biomass. These measurements support science requirements for the study of the carbon cycle and its relationship to climate change. The instrument is scheduled to be completed and flight tested in 2013. Index Terms SAR, Digital Beamforming, Interferometry.
SHELL: A Simulator for the Software Test Vehicle of the INFOPLEX Database Computer.
1982-01-01
3.6. GCER: Incoming Messages . . . . ...... 17 3.7. AAHER . . . . . . . . . . . . . . . 18 3.8. SAHER o .# . . a . . . . . . . . . . 18 3.9. Data...equal to the STIME clock of the AAH. The LOGMSG event will be handled by the SAHER . 3.8. SAHER SAHER is the procedure which simulates the action of a...SAH. A full description of its operation is given in Chapter 5. In short, each activation of SAHER resembles a scheduling cycle (of the operating
Dembo, M; De Penfold, J B; Ruiz, R; Casalta, H
1985-03-01
Four pigeons were trained to peck a key under different values of a temporally defined independent variable (T) and different probabilities of reinforcement (p). Parameter T is a fixed repeating time cycle and p the probability of reinforcement for the first response of each cycle T. Two dependent variables were used: mean response rate and mean postreinforcement pause. For all values of p a critical value for the independent variable T was found (T=1 sec) in which marked changes took place in response rate and postreinforcement pauses. Behavior typical of random ratio schedules was obtained at T 1 sec and behavior typical of random interval schedules at T 1 sec. Copyright © 1985. Published by Elsevier B.V.
Automated Long - Term Scheduling for the SOFIA Airborne Observatory
NASA Technical Reports Server (NTRS)
Civeit, Thomas
2013-01-01
The NASA Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint US/German project to develop and operate a gyro-stabilized 2.5-meter telescope in a Boeing 747SP. SOFIA's first science observations were made in December 2010. During 2011, SOFIA accomplished 30 flights in the "Early Science" program as well as a deployment to Germany. The new observing period, known as Cycle 1, is scheduled to begin in 2012. It includes 46 science flights grouped in four multi-week observing campaigns spread through a 13-month span. Automation of the flight scheduling process offers a major challenge to the SOFIA mission operations. First because it is needed to mitigate its relatively high cost per unit observing time compared to space-borne missions. Second because automated scheduling techniques available for ground-based and space-based telescopes are inappropriate for an airborne observatory. Although serious attempts have been made in the past to solve part of the problem, until recently mission operations staff was still manually scheduling flights. We present in this paper a new automated solution for generating SOFIA long-term schedules that will be used in operations from the Cycle 1 observing period. We describe the constraints that should be satisfied to solve the SOFIA scheduling problem in the context of real operations. We establish key formulas required to efficiently calculate the aircraft course over ground when evaluating flight schedules. We describe the foundations of the SOFIA long-term scheduler, the constraint representation, and the random search based algorithm that generates observation and instrument schedules. Finally, we report on how the new long-term scheduler has been used in operations to date.
Shock Position Control for Mode Transition in a Turbine Based Combined Cycle Engine Inlet Model
NASA Technical Reports Server (NTRS)
Csank, Jeffrey T.; Stueber, Thomas J.
2013-01-01
A dual flow-path inlet for a turbine based combined cycle (TBCC) propulsion system is to be tested in order to evaluate methodologies for performing a controlled inlet mode transition. Prior to experimental testing, simulation models are used to test, debug, and validate potential control algorithms which are designed to maintain shock position during inlet disturbances. One simulation package being used for testing is the High Mach Transient Engine Cycle Code simulation, known as HiTECC. This paper discusses the development of a mode transition schedule for the HiTECC simulation that is analogous to the development of inlet performance maps. Inlet performance maps, derived through experimental means, describe the performance and operability of the inlet as the splitter closes, switching power production from the turbine engine to the Dual Mode Scram Jet. With knowledge of the operability and performance tradeoffs, a closed loop system can be designed to optimize the performance of the inlet. This paper demonstrates the design of the closed loop control system and benefit with the implementation of a Proportional-Integral controller, an H-Infinity based controller, and a disturbance observer based controller; all of which avoid inlet unstart during a mode transition with a simulated disturbance that would lead to inlet unstart without closed loop control.
NASA Astrophysics Data System (ADS)
Sherwood, R.; Mutz, D.; Estlin, T.; Chien, S.; Backes, P.; Norris, J.; Tran, D.; Cooper, B.; Rabideau, G.; Mishkin, A.; Maxwell, S.
2001-07-01
This article discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from high-level science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This artificial intelligence (AI)-based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules. An automated planning and scheduling system encodes rover design knowledge and uses search and reasoning techniques to automatically generate low-level command sequences while respecting rover operability constraints, science and engineering preferences, environmental predictions, and also adhering to hard temporal constraints. This prototype planning system has been field-tested using the Rocky 7 rover at JPL and will be field-tested on more complex rovers to prove its effectiveness before transferring the technology to flight operations for an upcoming NASA mission. Enabling goal-driven commanding of planetary rovers greatly reduces the requirements for highly skilled rover engineering personnel. This in turn greatly reduces mission operations costs. In addition, goal-driven commanding permits a faster response to changes in rover state (e.g., faults) or science discoveries by removing the time-consuming manual sequence validation process, allowing rapid "what-if" analyses, and thus reducing overall cycle times.
Yoshinaka, Kiichi; Yamaguchi, Ai; Matsumura, Ritsuko; Node, Koichi; Tokuda, Isao; Akashi, Makoto
2017-10-01
Approximately 20% of workers in developed countries are involved in night work. Nevertheless, many studies have strongly suggested that night-work-induced chronic circadian misalignment increases the risk of a diverse range of health problems. Although a relation between night work and irregular menstrual cycles has been indicated epidemiologically, a direct causal link remains elusive. Here, we report that repetitive reversal of light-dark (LD) cycles triggers irregular estrous cycles in mice. The findings showed that the estrous cycle remained irregular for more than four weeks after the mice were returned to regular LD cycles. Importantly, the magnitude of the negative impact of reversed LD cycles on the estrous cycle, or more specifically the decreased number of normal estrous cycles during the observation period, was dependent on the difference in the frequency of LD reversal. Presently, no clear solution to prevent night-work-mediated menstrual abnormalities is available, and reducing night work in modern society is difficult. Our findings indicate that optimizing work schedules could significantly prevent menstrual problems without reducing total night-work time. © 2017 Molecular Biology Society of Japan and John Wiley & Sons Australia, Ltd.
1998-01-01
On STS-89, three Mechanics of Granular Materials (MGM) test cells were subjected to five cycles of compression and relief (left) and three were subjected to shorter displacement cycles that simulate motion during an earthquake (right). In the compression/relief tests, the sand particles rearranged themselves and slightly re-expanded the column during relief. In the short displacement tests, the specimen's resistance to compression decreases, even though the displacement remains the same. The specimens were cycled up to 100 times or until the resistive force was less than 1% that of the previous cycle. Sand and soil grains have faces that can cause friction as they roll and slide against each other, or even cause sticking and form small voids between grains. This complex behavior can cause soil to behave like a liquid under certain conditions such as earthquakes or when powders are handled in industrial processes. Mechanics of Granular Materials (MGM) experiments aboard the Space Shuttle use the microgravity of space to simulate this behavior under conditons that carnot be achieved in laboratory tests on Earth. MGM is shedding light on the behavior of fine-grain materials under low effective stresses. Applications include earthquake engineering, granular flow technologies (such as powder feed systems for pharmaceuticals and fertilizers), and terrestrial and planetary geology. Nine MGM specimens have flown on two Space Shuttle flights. Another three are scheduled to fly on STS-107. The principal investigator is Stein Sture of the University of Colorado at Boulder. Credit: NASA/Marshall Space Flight Center (MSFC)
Smart sensing to drive real-time loads scheduling algorithm in a domotic architecture
NASA Astrophysics Data System (ADS)
Santamaria, Amilcare Francesco; Raimondo, Pierfrancesco; De Rango, Floriano; Vaccaro, Andrea
2014-05-01
Nowadays the focus on power consumption represent a very important factor regarding the reduction of power consumption with correlated costs and the environmental sustainability problems. Automatic control load based on power consumption and use cycle represents the optimal solution to costs restraint. The purpose of these systems is to modulate the power request of electricity avoiding an unorganized work of the loads, using intelligent techniques to manage them based on real time scheduling algorithms. The goal is to coordinate a set of electrical loads to optimize energy costs and consumptions based on the stipulated contract terms. The proposed algorithm use two new main notions: priority driven loads and smart scheduling loads. The priority driven loads can be turned off (stand by) according to a priority policy established by the user if the consumption exceed a defined threshold, on the contrary smart scheduling loads are scheduled in a particular way to don't stop their Life Cycle (LC) safeguarding the devices functions or allowing the user to freely use the devices without the risk of exceeding the power threshold. The algorithm, using these two kind of notions and taking into account user requirements, manages loads activation and deactivation allowing the completion their operation cycle without exceeding the consumption threshold in an off-peak time range according to the electricity fare. This kind of logic is inspired by industrial lean manufacturing which focus is to minimize any kind of power waste optimizing the available resources.
Parametric Data from a Wind Tunnel Test on a Rocket-Based Combined-Cycle Engine Inlet
NASA Technical Reports Server (NTRS)
Fernandez, Rene; Trefny, Charles J.; Thomas, Scott R.; Bulman, Mel J.
2001-01-01
A 40-percent scale model of the inlet to a rocket-based combined-cycle (RBCC) engine was tested in the NASA Glenn Research Center 1- by 1-Foot Supersonic Wind Tunnel (SWT). The full-scale RBCC engine is scheduled for test in the Hypersonic Tunnel Facility (HTF) at NASA Glenn's Plum Brook Station at Mach 5 and 6. This engine will incorporate the configuration of this inlet model which achieved the best performance during the present experiment. The inlet test was conducted at Mach numbers of 4.0, 5.0, 5.5, and 6.0. The fixed-geometry inlet consists of an 8 deg.. forebody compression plate, boundary layer diverter, and two compressive struts located within 2 parallel sidewalls. These struts extend through the inlet, dividing the flowpath into three channels. Test parameters investigated included strut geometry, boundary layer ingestion, and Reynolds number (Re). Inlet axial pressure distributions and cross-sectional Pitot-pressure surveys at the base of the struts were measured at varying back-pressures. Inlet performance and starting data are presented. The inlet chosen for the RBCC engine self-started at all Mach numbers from 4 to 6. Pitot-pressure contours showed large flow nonuniformity on the body-side of the inlet. The inlet provided adequate pressure recovery and flow quality for the RBCC cycle even with the flow separation.
Oral ifosfamide-mesna: a clinical investigation in advanced non-small-cell lung cancer.
Manegold, C; Bischoff, H; Fischer, J R; Löchner, S; Peukert, M; Schmähl, A; Drings, P
1992-11-01
The purpose of this study was to evaluate the toxicity and response efficacy of fixed-dose oral ifosfamide (OI)-mesna (M) in advanced, non-small-cell lung cancer (NSCLC). OI was given in four different fractionated-dose treatment schedules with a total dose per cycle of either 3.0 g/m2, 6.0 g/m2, 7.5 g/m2 or 10 g/m2 (equivalent to a daily dose of either 750 mg, 1000 mg or 1250 mg.) M was given p.o. by drinking ampules. In the 64 patients (pts) included, a total of 305 treatment cycles were administered with no evidence of severe neurotoxicity. Twenty-two pts (37%) developed mild to moderate CNS toxicity. Neither myelosuppression, alopecia, gastrointestinal toxicity nor urotoxicity were clinical problems. On schedule 2 (6 g/m2), 3 of 14 evaluable pts (21%) had partial remissions (PR), and on schedule 3 (7.5 g/m2) 4 pts (25%) showed PRs. The median duration of response was 9 months (mts) for pts on schedule 2, and 8 mts for pts on schedule 3. We conclude that OIM can easily be tolerated in the same dose usually given intravenously (7.5 g/m2/mts), when patients at high risk for developing CNS toxicity have been previously excluded from therapy. In order to reduce CNS toxicity, it is suggested that the total dose per cycle should not exceed 7.5 g/m2 (1000 mg daily) within a fractionated-dose, 14-day treatment schedule. We further conclude that the tumor response efficacy of OIM in NSCLC is comparable to the one achieved by intravenously-administered IM, whereby the total monthly OI dose should not be less than 6.0 g/m2 (750 mg daily).
Phase-shifting human circadian rhythms: influence of sleep timing, social contact and light exposure
NASA Technical Reports Server (NTRS)
Duffy, J. F.; Kronauer, R. E.; Czeisler, C. A.
1996-01-01
1. Both the timing of behavioural events (activity, sleep and social interactions) and the environmental light-dark cycle have been reported to contribute to entrainment of human circadian rhythms to the 24 h day. Yet, the relative contribution of those putative behavioural synchronizers to that of light exposure remains unclear. 2. To investigate this, we inverted the schedule of rest, sedentary activity and social contact of thirty-two young men either with or without exposure to bright light. 3. On this inverted schedule, the endogenous component of the core temperature rhythm of subjects who were exposed to bright light showed a significant phase shift, demonstrating that they were adapting to the new schedule. In contrast, the core temperature rhythm of subjects who were not exposed to bright light moved on average 0.2 h later per day and after 10 days had not significantly adapted to the new schedule. 4. The direction of phase shift in the groups exposed to bright light was dependent on the time of bright light exposure, while control subjects drifted to a later hour regardless of the timing of their schedule of sleep timing, social contact and meals. 5. These results support the concept that the light-dark cycle is the most important synchronizer of the human circadian system. They suggest that inversion of the sleep-wake, rest-activity and social contact cycles provides relatively minimal drive for resetting the human circadian pacemaker. 6. These data indicate that interventions designed to phase shift human circadian rhythms for adjustment to time zone changes or altered work schedules should focus on properly timed light exposure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, B.E.; Bryan, W.E.; Goranson, P.L.
1985-01-01
The helical field (HF) coil set for the Advanced Toroidal Facility (ATF) is an M = 12, l = 2, constant-ratio torsatron winding consisting of 2 coils, each with 14 turns of heavy copper conductor. The coils are divided into 24 identical segments to facilitate fabrication and minimize the assembly schedule. The segments are connected across through-bolted lap joints that must carry up to 124,000 A per turn for 5 s or 62,500 A steady-state. In addition, the joints must carry the high magnetic and thermal loads induced in the conductor and still fit within the basic 140- by 30-mmmore » copper envelope. Extensive testing and development were undertaken to verify and refine the basic joint design. Tests included assembly force and clamping force for various types of misalignment; joint resistance as a function of clamping force; clamp bolt relaxation due to thermal cycling; fatigue testing of full-size, multiturn joint prototypes; and low-cycle fatigue and tensile tests of annealed CDA102 copper. The required performance parameters and actual test results, as well as the final joint configuration, are presented. 2 refs., 9 figs., 4 tabs.« less
Electric/Hybrid Vehicle Simulation
NASA Technical Reports Server (NTRS)
Slusser, R. A.; Chapman, C. P.; Brennand, J. P.
1985-01-01
ELVEC computer program provides vehicle designer with simulation tool for detailed studies of electric and hybrid vehicle performance and cost. ELVEC simulates performance of user-specified electric or hybrid vehicle under user specified driving schedule profile or operating schedule. ELVEC performs vehicle design and life cycle cost analysis.
2003-12-09
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, after being removed from the solid rocket booster (SRB), the forward assembly is lowered toward a transporter below in the transfer aisle. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.
2003-12-09
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, after being removed from the solid rocket booster (SRB), the forward assembly is lowered from high above the transfer aisle. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.
Intelligent Scheduling for Underground Mobile Mining Equipment
Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John
2015-01-01
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine. PMID:26098934
NASA Astrophysics Data System (ADS)
Na, Kwangsam; Biswas, Subhasis; Robertson, William; Sahay, Keshav; Okamoto, Robert; Mitchell, Alexander; Lemieux, Sharon
2015-04-01
As part of a broad evaluation of the environmental impacts of biodiesel and renewable diesel as alternative motor fuels and fuel blends in California, the California Air Resources Board's (CARB) Heavy-duty Diesel Emission Testing Laboratory conducted chassis dynamometer exhaust emission measurements on in-use heavy-heavy-duty diesel trucks (HHDDT). The results presented here detail the impact of biodiesel and renewable diesel fuels and fuel blends as compared to CARB ULSD on particulate matter (PM), regulated gases, and two greenhouse gases emissions from a HHDDT with a 2000 C15 Caterpillar engine with no exhaust after treatment devices. This vehicle was tested over the Urban Dynamometer Driving Schedule (UDDS) and the cruise portion of the California HHDDT driving schedule. Three neat blend stocks (soy-based and animal-based fatty acid methyl ester (FAME) biodiesels, and a renewable diesel) and CARB-certified ultra-low sulfur diesel (CARB ULSD) along with their 20% and 50% blends (blended with CARB ULSD) were tested. The effects of blend level on emission characteristics were discussed on g·km-1 basis. The results showed that PM, total hydrocarbon (THC), and carbon monoxide (CO) emissions were dependent on driving cycles, showing higher emissions for the UDDS cycles with medium load than the highway cruise cycle with high load on per km basis. When comparing CARB ULSD to biodiesels and renewable diesel blends, it was observed that the PM, THC, and CO emissions decreased with increasing blend levels regardless of the driving cycles. Note that biodiesel blends showed higher degree of emission reductions for PM, THC, and CO than renewable diesel blends. Both biodiesels and renewable diesel blends effectively reduced PM emissions, mainly due to reduction in elemental carbon emissions (EC), however no readily apparent reductions in organic carbon (OC) emissions were observed. When compared to CARB ULSD, soy- and animal-based biodiesel blends showed statistically significant increases in nitrogen oxides (NOx) emissions for 50% or higher biodiesel blends. The 20% blends of the biodiesels showed no statistically significant effect on NOx emissions on any cycle. In contrast, renewable diesel slightly decreased NOx emissions and the degree of reduction was statistically significant for 50% or higher blends over the UDDS cycle, but not at the 20% blends. The highway cruise cycles did not show a statistically strong NOx emission trend with increasing blend level of renewable diesel. Biodiesel and renewable fuel impacts on two greenhouse gases, CO2 and N2O emissions were of lower magnitude when compared to other regulated pollutants emissions, showing a change in their emissions within approximately ±3% from the CARB ULSD.
Deming, Dustin A; Ninan, Jacob; Bailey, Howard H; Kolesar, Jill M; Eickhoff, Jens; Reid, Joel M; Ames, Matthew M; McGovern, Renee M; Alberti, Dona; Marnocha, Rebecca; Espinoza-Delgado, Igor; Wright, John; Wilding, George; Schelman, William R
2014-04-01
Accumulating evidence shows evidence of efficacy with the combination of vorinostat and bortezomib in solid tumors. We previously examined a once-daily continuous dosing schedule of vorinostat in combination with bortezomib which was well tolerated in cycles 1 and 2; however, there was concern regarding the tolerability through multiple cycles. This study was conducted to evaluate an intermittent dosing schedule of vorinostat with bortezomib. Vorinostat was initially administered orally twice daily on days 1-14 with bortezomib IV on days 1, 4, 8, and 11 of a 21 day cycle. Two DLTs (elevated ALT and fatigue) were observed at dose level 1, thus the protocol was amended to administer vorinostat intermittently twice daily on days 1-4 and 8-11. 29 patients were enrolled; 13 men and 16 women. Common cancer types included sarcoma, pancreatic, colorectal, GIST, and breast. The most common Grade 3-4 toxicities at any dose level included thrombocytopenia, fatigue, increased ALT, elevated INR, and diarrhea. DLTs in the intermittent dosing scheduled included thrombocytopenia and fatigue. The Cmax and AUC for the intermittent dosing regimen were similar to those observed in the daily dosing. In this heavily pretreated population, stable disease was observed in patients with sarcoma, colorectal adenocarcinoma and GIST. The MTD was established at vorinostat 300 mg BID on days 1-4 and 8-11 and bortezomib 1.3 mg/m(2) IV on days 1, 4, 8, and 11 of a 21 day cycle. Tolerability was not improved with the intermittent dosing schedule of vorinostat when compared to continuous dosing.
A Cross-Layer Duty Cycle MAC Protocol Supporting a Pipeline Feature for Wireless Sensor Networks
Tong, Fei; Xie, Rong; Shu, Lei; Kim, Young-Chon
2011-01-01
Although the conventional duty cycle MAC protocols for Wireless Sensor Networks (WSNs) such as RMAC perform well in terms of saving energy and reducing end-to-end delivery latency, they were designed independently and require an extra routing protocol in the network layer to provide path information for the MAC layer. In this paper, we propose a new cross-layer duty cycle MAC protocol with data forwarding supporting a pipeline feature (P-MAC) for WSNs. P-MAC first divides the whole network into many grades around the sink. Each node identifies its grade according to its logical hop distance to the sink and simultaneously establishes a sleep/wakeup schedule using the grade information. Those nodes in the same grade keep the same schedule, which is staggered with the schedule of the nodes in the adjacent grade. Then a variation of the RTS/CTS handshake mechanism is used to forward data continuously in a pipeline fashion from the higher grade to the lower grade nodes and finally to the sink. No extra routing overhead is needed, thus increasing the network scalability while maintaining the superiority of duty-cycling. The simulation results in OPNET show that P-MAC has better performance than S-MAC and RMAC in terms of packet delivery latency and energy efficiency. PMID:22163895
Advanced Nuclear Fuel Cycle Transitions: Optimization, Modeling Choices, and Disruptions
NASA Astrophysics Data System (ADS)
Carlsen, Robert W.
Many nuclear fuel cycle simulators have evolved over time to help understan the nuclear industry/ecosystem at a macroscopic level. Cyclus is one of th first fuel cycle simulators to accommodate larger-scale analysis with it liberal open-source licensing and first-class Linux support. Cyclus also ha features that uniquely enable investigating the effects of modeling choices o fuel cycle simulators and scenarios. This work is divided into thre experiments focusing on optimization, effects of modeling choices, and fue cycle uncertainty. Effective optimization techniques are developed for automatically determinin desirable facility deployment schedules with Cyclus. A novel method fo mapping optimization variables to deployment schedules is developed. Thi allows relationships between reactor types and scenario constraints to b represented implicitly in the variable definitions enabling the usage o optimizers lacking constraint support. It also prevents wasting computationa resources evaluating infeasible deployment schedules. Deployed power capacit over time and deployment of non-reactor facilities are also included a optimization variables There are many fuel cycle simulators built with different combinations o modeling choices. Comparing results between them is often difficult. Cyclus flexibility allows comparing effects of many such modeling choices. Reacto refueling cycle synchronization and inter-facility competition among othe effects are compared in four cases each using combinations of fleet of individually modeled reactors with 1-month or 3-month time steps. There are noticeable differences in results for the different cases. The larges differences occur during periods of constrained reactor fuel availability This and similar work can help improve the quality of fuel cycle analysi generally There is significant uncertainty associated deploying new nuclear technologie such as time-frames for technology availability and the cost of buildin advanced reactors. Historically, fuel cycle analysis has focused on answerin questions of fuel cycle feasibility and optimality. However, there has no been much work done to address uncertainty in fuel cycle analysis helpin answer questions of fuel cycle robustness. This work develops an demonstrates a methodology for evaluating deployment strategies whil accounting for uncertainty. Techniques are developed for measuring th hedging properties of deployment strategies under uncertainty. Additionally methods for using optimization to automatically find good hedging strategie are demonstrated.
Cortisol, reaction time test and health among offshore shift workers.
Harris, Anette; Waage, Siri; Ursin, Holger; Hansen, Ase Marie; Bjorvatn, Bjørn; Eriksen, Hege R
2010-10-01
The stress hormone cortisol shows a pronounced endogenous diurnal rhythm, which is affected by the sleep/wake cycle, meals and activity. Shift work and especially night work disrupts the sleep/wake cycle and causes a desynchronization of the natural biological rhythms. Therefore, different shift schedules may have different impact on performance at work and health. The purpose was to study if health, reaction time, and the cortisol rhythm were negatively affected when a group of shift workers changed their work schedule from ordinary day-night shift (fixed shift) to "swing shift". 19 healthy workers on a Norwegian oil rig participated in the study. They worked 2 weeks offshore followed by 4 weeks off work. The ordinary schedule consisted of 12-h day shift and 12-h night shift every other work period (14 days or nights=fixed shift). "Swing shift" involved 1 week of night shift, followed by 1 week of day shift during the work period. All participants worked ordinary day-night shift when baseline data were collected (questionnaires, saliva cortisol, and reaction time during work). After collection of baseline data the workers changed their work schedule to "swing shift", for every working period, and 9 months later the same data were collected. "Swing shift" did not give any negative health effects or any negative changes in reaction time during the day they shifted from night work to day work. Personnel adapted to night shift within a week regardless of schedule, but recovery from night shift took longer time. During swing shift the cortisol rhythm went back towards a normal rhythm in the second week, but it was not returned completely to normal values when they returned home for the 4 weeks off period. However, the cortisol rhythms were readapted to normal values after 1 week at home. For personnel returning home directly from 14 consecutive night shifts, cortisol adaptation was not complete after 1 week at home. We found no increase in health complaints from swing shift or reaction time in the shift from night to day work. Recovery from night shift takes longer time. Copyright © 2010 Elsevier Ltd. All rights reserved.
1994-01-01
but do not provide strategies or specific schedules of crew rest tailored to the- unit’s specific mission demands, environmental conditions, and...and the impact of mission driven work schedules and environmental conditions on crew rest quality. Phase II provides rhythms, sleep/wake cycles...shiftwork schedules , and methods for regulating the body’s biological clock to prevent sleep loss during characteristic mission. This report contains a
Proceedings on Expert Systems Workshop Held in Pacific Grove, California on 16-18 April 1986
1986-04-01
list is empty, the scheduler process is guar- As a result, fewer evaluator cycles are wasted waiting for the schedulcr process to anteed to be waiting...SECURITY CLASS. (of this report) UNCLASSIFIED ISa. DECLASSI FICATION/DOWNGRADING SCHEDULE 16. DISTRIBUTION STATEMENT (of this Report) APPROVED FOR PUBLIC...parallel. makes them easy to port to alternative new *--Features unimplemented at present; scheduled formachines,.hse2 phase 2. To cover a larger set
Bi-Axial Solar Array Drive Mechanism: Design, Build and Environmental Testing
NASA Technical Reports Server (NTRS)
Scheidegger, Noemy; Ferris, Mark; Phillips, Nigel
2014-01-01
The development of the Bi-Axial Solar Array Drive Mechanism (BSADM) presented in this paper is a demonstration of SSTL's unique space manufacturing approach that enables performing rapid development cycles for cost-effective products that meet ever-challenging mission requirements: The BSADM is designed to orient a solar array wing towards the sun, using its first rotation axis to track the sun, and its second rotation axis to compensate for the satellite orbit and attitude changes needed for a successful payload operation. The tight development schedule, with manufacture of 7 Flight Models within 1.5 year after kick-off, is offset by the risk-reduction of using qualified key component-families from other proven SSTL mechanisms. This allowed focusing the BSADM design activities on the mechanism features that are unique to the BSADM, and having an Engineering Qualification Model (EQM) built 8 months after kick-off. The EQM is currently undergoing a full environmental qualification test campaign. This paper presents the BSADM design approach that enabled meeting such a challenging schedule, its design particularities, and the ongoing verification activities.
Brainard, George C; Barger, Laura K; Soler, Robert R; Hanifin, John P
2016-11-01
The review addresses the development of a new solid-state lighting system for the International Space Station (ISS) that is intended to enhance the illumination of the working and living environment of astronauts and to improve sleep, circadian entrainment, and daytime alertness. Spaceflight missions often expose astronauts and mission support ground crews to atypical sleep-wake cycles and work schedules. A recent, extensive study describes the sleep characteristics and use of sleep-promoting pharmaceuticals in astronauts before, during, and after spaceflight. The acceptability, feasibility, and efficacy of the new ISS solid-state lighting systems are currently being tested in ground-based, analog studies. Installation of this lighting system on the ISS is scheduled to begin later this year. In-flight testing of this lighting system is planned to take place during ISS spaceflight expeditions. If the new ISS lighting system is capable of improving circadian entrainment and sleep during spaceflight, it should enhance astronaut health, performance, well-being, and safety. Such an advance would open the door to future lighting applications for humans living on Earth.
IV&V Project Assessment Process Validation
NASA Technical Reports Server (NTRS)
Driskell, Stephen
2012-01-01
The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.
Testing Task Schedulers on Linux System
NASA Astrophysics Data System (ADS)
Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj
Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).
Li, Kai Chun; Waddell, J Neil; Prior, David J; Ting, Stephanie; Girvan, Liz; van Vuuren, Ludwig Jansen; Swain, Michael V
2013-11-01
To investigate the effect of autoclave induced low-temperature degradation on the adhesion energy between yttria-stabilized zirconia veneered with porcelain. The strain energy release rate using a four-point bending stable fracture test was evaluated for two different porcelains [leucite containing (VM9) and glass (Zirox) porcelain] veneered to zirconia. Prior to veneering the zirconia had been subjected to 0 (control), 1, 5, 10 and 20 autoclave cycles. The specimens were manufactured to a total bi-layer dimension of 30 mm × 8 mm × 3 mm. Subsequent scanning electron microscopy/energy dispersive spectrometry, electron backscatter diffraction and X-ray diffraction analysis were performed to identify the phase transformation and fracture behavior. The strain energy release rate for debonding of the VM9 specimens were significantly higher (p<0.05) compared to the Zirox specimens across all test groups. Increasing autoclave cycles lowered the strain energy release rate significantly (p<0.05) from 18.67 J/m(2) (control) to the lowest of 12.79 J/m(2) (cycle 10) for only the VM9 specimens. SEM analyses showed predominant cohesive fracture within the porcelain for all cycle groups. XRD analysis of the substrate prior to veneering confirmed a tetragonal to monoclinic phase transformation with increasing the number of autoclave cycles between 5 and 20. The monoclinic phase reverted back to tetragonal phase after undergoing conventional porcelain firing cycles. EBSD data showed significant changes of the grain size distribution between the control and autoclaved specimen (cycle 20). Increasing autoclave cycles only significantly decreased the adhesion of the VM9 layered specimens. In addition, a conventional porcelain firing schedule completely reverted the monoclinic phase back to tetragonal. Copyright © 2013 Academy of Dental Materials. Published by Elsevier Ltd. All rights reserved.
Naturalistic drive cycle synthesis for pickup trucks.
Liu, Zifan; Ivanco, Andrej; Filipi, Zoran
2015-09-01
Future pick-up trucks are meeting much stricter fuel economy and exhaust emission standards. Design tradeoffs will have to be carefully evaluated to satisfy consumer expectations within the regulatory and cost constraints. Boundary conditions will obviously be critical for decision making: thus, the understanding of how customers are driving in naturalistic settings is indispensable. Federal driving schedules, while critical for certification, do not capture the richness of naturalistic cycles, particularly the aggressive maneuvers that often shape consumer perception of performance. While there are databases with large number of drive cycles, applying all of them directly in the design process is impractical. Therefore, representative drive cycles that capture the essence of the naturalistic driving should be synthesized from naturalistic driving data. Naturalistic drive cycles are firstly categorized by investigating their micro-trip components, defined as driving activities between successive stops. Micro-trips are expected to characterize underlying local traffic conditions, and separate different driving patterns. Next, the transitions from one vehicle state to another vehicle state in each cycle category are captured with Transition Probability Matrix (TPM). Candidate drive cycles can subsequently be synthesized using Markov Chain based on TPMs for each category. Finally, representative synthetic drive cycles are selected through assessment of significant cycle metrics to identify the ones with smallest errors. This paper provides a framework for synthesis of representative drive cycles from naturalistic driving data, which can subsequently be used for efficient optimization of design or control of pick-up truck powertrains. Manufacturers will benefit from representative drive cycles in several aspects, including quick assessments of vehicle performance and energy consumption in simulations, component sizing and design, optimization of control strategies, and vehicle testing under real-world conditions. This is in contrast to using federal certification test cycles, which were never intended to capture pickup truck segment. Copyright © 2015 Elsevier Ltd and National Safety Council. All rights reserved.
Space shuttle low cost/risk avionics study
NASA Technical Reports Server (NTRS)
1971-01-01
All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.
Characterization testing of a 40 AHR bipolar nickel-hydrogen battery
NASA Astrophysics Data System (ADS)
Brewer, Jeffrey C.; Manzo, Michelle A.; Gemeiner, Russel P.
1989-12-01
Extensive characterization testing has been done on a second 40 amp-hour (Ahr), 10-cell bipolar nickel-hydrogen (Ni-H2) battery to study the effects of such operating parameters as charge and discharge rates, temperature, and pressure, on capacity, Ahr and watt-hour (Whr) efficiencies, end-of-charge (EOC) and mid-point discharge voltages. Testing to date has produced many interesting results, with the battery performing well throughout all of the test matrix except during the high-rate (5C and 10C) discharges, where poorer than expected results were observed. The exact cause of this poor performance is, as yet, unknown. Small scale 2 x 2 inch battery tests are to be used in studying this problem. Low earth orbit (LEO) cycle life testing at a 40 percent depth of discharge (DOD) and 10 C is scheduled to follow the characterization testing.
Characterization testing of a 40 AHR bipolar nickel-hydrogen battery
NASA Technical Reports Server (NTRS)
Brewer, Jeffrey C.; Manzo, Michelle A.; Gemeiner, Russel P.
1989-01-01
Extensive characterization testing has been done on a second 40 amp-hour (Ahr), 10-cell bipolar nickel-hydrogen (Ni-H2) battery to study the effects of such operating parameters as charge and discharge rates, temperature, and pressure, on capacity, Ahr and watt-hour (Whr) efficiencies, end-of-charge (EOC) and mid-point discharge voltages. Testing to date has produced many interesting results, with the battery performing well throughout all of the test matrix except during the high-rate (5C and 10C) discharges, where poorer than expected results were observed. The exact cause of this poor performance is, as yet, unknown. Small scale 2 x 2 inch battery tests are to be used in studying this problem. Low earth orbit (LEO) cycle life testing at a 40 percent depth of discharge (DOD) and 10 C is scheduled to follow the characterization testing.
Characterization testing of a 40 ampere hour bipolar nickel-hydrogen battery
NASA Technical Reports Server (NTRS)
Brewer, Jeffrey C.; Manzo, Michelle A.; Gemeiner, Russel P.
1990-01-01
Extensive characterization testing has been done on a second 40-ampere hour (A h), 10-cell, bipolar nickel-hydrogen (Ni-H2) battery, to study the effects of operating parameters such as charge and discharge rates, temperature, and pressure on capacity, A h and watt hour (W h) efficiencies, and end-of-charge and midpoint discharge voltages. Testing to date has produced many interesting results, with the battery performing well throughout the test matrix except during the high-rate (5 C and 10 C) discharges, where poorer than expected results were observed. The exact cause of this poor performance is, as yet, unknown. Small scale 2 in. x 2 in. battery tests are to be used in studying this problem. Low earth orbit cycle life testing at a 40-percent depth of discharge and 10 C is scheduled to follow the characterization testing.
Using Optimization to Improve Test Planning
2017-09-01
friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool for the test and... evaluation schedulers. 14. SUBJECT TERMS schedule optimization, test planning 15. NUMBER OF PAGES 223 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...make the input more user-friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool
Inspection and monitoring of wind turbine blade-embedded wave defects during fatigue testing
Niezrecki, Christopher; Avitabile, Peter; Chen, Julie; ...
2014-05-20
The research we present in this article focuses on a 9-m CX-100 wind turbine blade, designed by a team led by Sandia National Laboratories and manufactured by TPI Composites Inc. The key difference between the 9-m blade and baseline CX-100 blades is that this blade contains fabric wave defects of controlled geometry inserted at specified locations along the blade length. The defect blade was tested at the National Wind Technology Center at the National Renewable Energy Laboratory using a schedule of cycles at increasing load level until failure was detected. Our researchers used digital image correlation, shearography, acoustic emission, fiber-opticmore » strain sensing, thermal imaging, and piezoelectric sensing as structural health monitoring techniques. Furthermore, this article provides a comparison of the sensing results of these different structural health monitoring approaches to detect the defects and track the resultant damage from the initial fatigue cycle to final failure.« less
The Application of Project Management Techniques to College and University Admissions Activities.
ERIC Educational Resources Information Center
Bickers, Doyle
1993-01-01
The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)
Project Interface Requirements Process Including Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2010-01-01
Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings
NASA Astrophysics Data System (ADS)
Anseán, D.; Dubarry, M.; Devie, A.; Liaw, B. Y.; García, V. M.; Viera, J. C.; González, M.
2017-07-01
Lithium plating is considered one of the most detrimental phenomenon in lithium ion batteries (LIBs), as it increases cell degradation and might lead to safety issues. Plating induced LIB failure presents a major concern for emerging applications in transportation and electrical energy storage. Hence, the necessity to operando monitor, detect and analyze lithium plating becomes critical for safe and reliable usage of LIB systems. Here, we report in situ lithium plating analyses for a commercial graphite||LiFePO4 cell cycled under dynamic stress test (DST) driving schedule. We designed a framework based on incremental capacity (IC) analysis and mechanistic model simulations to quantify degradation modes, relate their effects to lithium plating occurrence and assess cell degradation. The results show that lithium plating was induced by large loss of active material on the negative electrode that eventually led the electrode to over-lithiate. Moreover, when lithium plating emerged, we quantified that the loss of lithium inventory pace was increased by a factor of four. This study illustrates the benefits of the proposed framework to improve lithium plating analysis. It also discloses the symptoms of lithium plating formation, which prove valuable for novel, online strategies on early lithium plating detection.
Pressurized fluidized bed combustion of coal for electric power generation the AEP approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Markowsky J.J.; Wickstrom, B.
1982-08-01
American Electric Power (AEP), STAL-LAVAL Turbine A.B. (SL), and Deutsche Babcock Anlagen AG (DBA) are working on a program estimated to cost $250 million that will lead toward the construction of a large (170,000 KW) commercial demonstration of an advanced electric power plant incorporating Pressurized Fluidized Bed Combustion (PFBC) of coal. A pilot plant test program carried out during 1977-1980 verified combustor performance and demonstrated long gas turbine blade life. Parallel efforts during this period involved the design of the 170,000 kW Commercial Demonstration Plant (CDP) and a 500,000 kW Commercial Plant which essentially consists of two CDP combustors-gas turbinemore » modules and a larger capacity steam cycle. These efforts showed considerable economic advantages of PFBC-combined cycle power generation over other alternative technologies. A 15,000 KW (thermal) component test facility (CTF) is presently under construction in Sweden. Extensive testing is scheduled to begin in early 1982. Upon successful completion of these tests, AEP intends to start construction of the CDP in 1983; the plant is expected to supply power to the AEP network by 1986.« less
Utilization Bound of Non-preemptive Fixed Priority Schedulers
NASA Astrophysics Data System (ADS)
Park, Moonju; Chae, Jinseok
It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.
Ubaldo-Reyes, L M; Buijs, R M; Escobar, C; Ángeles-Castellanos, M
2017-08-01
Travelling across several time zones requires a fast adjustment of the circadian system and the differential adjustment speeds of organs and systems results in what is commonly referred as jet lag. During this transitory state of circadian disruption, individuals feel discomfort, appetite loss, fatigue, disturbed sleep and deficient performance of multiple tasks. We have demonstrated that after a 6-h phase advance of the light-dark cycle (LD) scheduled food in phase with the new night onset can speed up re-entrainment. In this study, we explored the possible mechanisms underlying the fast re-entrainment due to the feeding schedule. We focused on first- and second-order structures that provide metabolic information to the suprachiasmatic nucleus (SCN). We compared (i) control rats without change in LD cycle; (ii) rats exposed to a 6-h phase advance of the LD cycle with food ad libitum; and (iii) rats exposed to the 6-h phase advance combined with food access in phase with the new night. We found an immediate synchronizing effect of food on stomach distention and on c-Fos expression in the nucleus of the solitary tract, arcuate nucleus of the hypothalamus, dorsomedial hypothalamic nucleus and paraventricular nucleus. These observations indicate that in a model of jet lag, scheduled feeding can favour an immediate shift in first- and second-order relays to the SCN and that by keeping feeding schedules coupled to the new night, a fast re-entrainment may be achieved by shifting peripheral and extra-SCN oscillations. © 2017 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.
Caiyan, Wang; Wen, Di; Qinping, Liao; Huan, Shen; Ziyan, Han; Liangdan, Tang; Zheng'ai, Xiong; Yufeng, Li; Shulan, Zhang; Baihua, Dong; Xiaoyan, Xin; Mulan, Ren; Xiaomao, Li; Youdi, Xu; Zhisong, Ma; Meiqing, Xie; Hongyu, Wu; Zirong, Huang
2014-05-01
To assess the efficacy, bleeding pattern, cycle control and safety of a combined oral contraceptive (YAZ) containing drospirenone 3 mg and ethinylestradiol 20 µg in a 24+4-day regimen in China. This is a multi-center, open, one-label study. Healthy females aged 18-45 years received YAZ for 13 cycles. Following-ups were scheduled during the treatment phase on Day 12-19 of Cycle 1, 4, 7 and 10 and 10-17 days after completing the study. The efficacy variables were the number of unintended pregnancies, bleeding pattern and cycle control. The safety variables were adverse events (AE), lab examinations, physical and gynecological examinations, vital signs and body weights and questionnaires. Four pregnancies occurred among 675 women for 603.78 women-years, resulting in a Pearl index (PI) of 0.7 and adjusted PI of 0.6. The cumulative 1-year pregnancy rate was 0.66%. The mean number of bleeding/spotting days was (26.3 ± 12.4) days in reference period 1 and (15.4 ± 5.5) days in reference period 4. 94.2% (582/618)- 96.8% (538/558) subjects experienced scheduled bleeding. The mean duration of scheduled bleeding decreased from (5.9 ± 3.2) to (5.0 ± 1.6) days. The percentage of women with intermenstrual bleeding decreased from 14.5% (90/621) at Cycle 1 to 2.3% (13/558) at Cycle 12. The common AE relating treatment include nausea (3.4%, 23/675), breast tenderness (1.2%, 8/675), dizzy (1.2%), vagina bleeding (1.2%). No serious AE relating treatment occurred. 85.6% (542/633) subjects were satisfied or very satisfied with the study treatment. YAZ is highly effective, acceptable and safe for Chinese women.
Navy Program Manager’s Guide, 1985 Edition
1985-01-01
1-7 Relationship of Development Cost in System Life -Cycle Cost (LCC) ......................... 1-7 Realistic Costing and Budgeting...Review (PROR)..... 4-53 x MI *) First-Article Configuration Inspection (FACI) ...... 4-54 Cost Management- Life -Cycle Costing (LCC) ..................... 4...innovation and minimize costs. 4. Consideration of life -cycle cost (LCC) such that affordability is put on an equal basis with system performance, schedule
Undevia, Samir D.; Innocenti, Federico; Ramirez, Jacqueline; House, Larry; Desai, Apurva A.; Skoog, Linda A.; Singh, Deepti A.; Karrison, Theodore; Kindler, Hedy L.; Ratain, Mark J.
2009-01-01
Purpose To investigate the safety and pharmacokinetics of R(+)XK469, a quinoxaline analogue, in patients with advanced refractory solid tumours. Preclinical studies suggested that efficacy was independent of schedule but that toxicity was decreased by dividing the dose. Methods R(+)XK469 was initially administered as a 30 min intravenous infusion on days 1–5 of a 21-d cycle. Based on the demonstration of a long half-life, the dosing schedule was subsequently amended to infusion on days 1, 3 and 5 of a 21-d cycle. An alternate single-dose schedule of once every 21 d was also explored. Blood samples were collected for pharmaco-kinetic studies. Results Dose-limiting toxicity (DLT) was neutropaenia. There was significant interindividual variability in clearance as evidenced by a coefficient of variation of 46%. A flat-dosing scheme (not based on body surface area) was justified by the absence of correlation between clearance and body surface area. A partial response was observed in a patient with nasopharyngeal carcinoma. Conclusions The recommended phase II doses are 850–1100 mg/d on days 1, 3 and 5 of a 21-d cycle and 2500 mg on day 1 of a 21-d cycle. The observed interpatient pharmacokinetic variability should prompt investigation into the presence of genetic polymorphism in relevant metabolizing enzymes. PMID:18650079
DOT National Transportation Integrated Search
2014-05-01
The U.S. Environmental Protection Agencys (EPA) newest emissions model, MOtor Vehicle : Emission Simulator (MOVES), uses a disaggregate approach that enables the users of the model to create : and use local drive schedules (drive cycles) in order ...
O’Cearbhaill, Roisin; Zhou, Qin; Iasonos, Alexia; Hensley, Martee L.; Tew, William P.; Aghajanian, Carol; Spriggs, David R.; Lichtman, Stuart M.; Sabbatini, Paul J.
2015-01-01
Objective Repeated exposure to carboplatin can lead to hypersensitivity reactions during retreatment with carboplatin. This may prevent its further use in platinum-sensitive ovarian cancer patients. At our institution, an increasing proportion of patients are prophylactically converted to an extended schedule of infusion after 8 cycles of carboplatin. We sought to determine whether an incrementally increasing, extended 3-hour infusion of carboplatin was associated with a lower rate of hypersensitivity reactions compared to the standard 30-minute schedule in sequentially treated patients. Methods We performed a retrospective electronic medical record review of patients with recurrent ovarian cancer retreated with carboplatin at our institution from 01/98–12/08. Results Seven hundred seventy-seven patients with relapsed ovarian, fallopian tube, or primary peritoneal cancer were retreated with carboplatin and met study inclusion criteria. Of these, 117 (17%) developed hypersensitivity reactions during second-line or greater carboplatin-based treatment for recurrent disease. Only 6 (3.4%) of the 174 patients who received the extended schedule developed hypersensitivity reactions (0% grade 4; 1.7% grade 3) compared to 111 (21%) of 533 patients in the standard schedule group (12% grade 4; 77% grade 3). The first hypersensitivity episode occurred after a median of 16 platinum (carboplatin and cisplatin) treatments in the extended group compared to 9 in the standard group. Using the Fisher-exact test, there was an association with a reduced incidence of hypersensitivity reactions with the extended infusion schedule (P<0.001). Conclusion Our data suggest appropriate premedication and prophylactic conversion to an extended infusion during carboplatin retreatment may reduce hypersensitivity reactions. PMID:19944454
Parametric Cost and Schedule Modeling for Early Technology Development
2018-04-02
Best Paper in the Analysis Methods Category and 2017 Best Paper Overall awards. It was also presented at the 2017 NASA Cost and Schedule Symposium... Methods over the Project Life Cycle .............................................................................................. 2 Figure 2. Average...information contribute to the lack of data, objective models, and methods that can be broadly applied in early planning stages. Scientific
A Deadline-Aware Scheduling and Forwarding Scheme in Wireless Sensor Networks.
Dao, Thi-Nga; Yoon, Seokhoon; Kim, Jangyoung
2016-01-05
Many applications in wireless sensor networks (WSNs) require energy consumption to be minimized and the data delivered to the sink within a specific delay. A usual solution for reducing energy consumption is duty cycling, in which nodes periodically switch between sleep and active states. By increasing the duty cycle interval, consumed energy can be reduced more. However, a large duty cycle interval causes a long end-to-end (E2E) packet delay. As a result, the requirement of a specific delay bound for packet delivery may not be satisfied. In this paper, we aim at maximizing the duty cycle while still guaranteeing that the packets arrive at the sink with the required probability, i.e., the required delay-constrained success ratio (DCSR) is achieved. In order to meet this objective, we propose a novel scheduling and forwarding scheme, namely the deadline-aware scheduling and forwarding (DASF) algorithm. In DASF, the E2E delay distribution with the given network model and parameters is estimated in order to determine the maximum duty cycle interval, with which the required DCSR is satisfied. Each node independently selects a wake-up time using the selected interval, and packets are forwarded to a node in the potential forwarding set, which is determined based on the distance between nodes and the sink. DASF does not require time synchronization between nodes, and a node does not need to maintain neighboring node information in advance. Simulation results show that the proposed scheme can satisfy a required delay-constrained success ratio and outperforms existing algorithms in terms of E2E delay and DCSR.
A Deadline-Aware Scheduling and Forwarding Scheme in Wireless Sensor Networks
Dao, Thi-Nga; Yoon, Seokhoon; Kim, Jangyoung
2016-01-01
Many applications in wireless sensor networks (WSNs) require energy consumption to be minimized and the data delivered to the sink within a specific delay. A usual solution for reducing energy consumption is duty cycling, in which nodes periodically switch between sleep and active states. By increasing the duty cycle interval, consumed energy can be reduced more. However, a large duty cycle interval causes a long end-to-end (E2E) packet delay. As a result, the requirement of a specific delay bound for packet delivery may not be satisfied. In this paper, we aim at maximizing the duty cycle while still guaranteeing that the packets arrive at the sink with the required probability, i.e., the required delay-constrained success ratio (DCSR) is achieved. In order to meet this objective, we propose a novel scheduling and forwarding scheme, namely the deadline-aware scheduling and forwarding (DASF) algorithm. In DASF, the E2E delay distribution with the given network model and parameters is estimated in order to determine the maximum duty cycle interval, with which the required DCSR is satisfied. Each node independently selects a wake-up time using the selected interval, and packets are forwarded to a node in the potential forwarding set, which is determined based on the distance between nodes and the sink. DASF does not require time synchronization between nodes, and a node does not need to maintain neighboring node information in advance. Simulation results show that the proposed scheme can satisfy a required delay-constrained success ratio and outperforms existing algorithms in terms of E2E delay and DCSR. PMID:26742046
Chervin, Ronald D; Garetz, Susan L; Ruzicka, Deborah L; Hodges, Elise K; Giordani, Bruno J; Dillon, James E; Felt, Barbara T; Hoban, Timothy F; Guire, Kenneth E; O'Brien, Louise M; Burns, Joseph W
2014-08-15
Pediatric obstructive sleep apnea (OSA) is associated with hyperactive behavior, cognitive deficits, psychiatric morbidity, and sleepiness, but objective polysomnographic measures of OSA presence or severity among children scheduled for adenotonsillectomy have not explained why. To assess whether sleep fragmentation might explain neurobehavioral outcomes, we prospectively assessed the predictive value of standard arousals and also respiratory cycle-related EEG changes (RCREC), thought to reflect inspiratory microarousals. Washtenaw County Adenotonsillectomy Cohort II participants included children (ages 3-12 years) scheduled for adenotonsillectomy, for any clinical indication. At enrollment and again 7.2 ± 0.9 (SD) months later, children had polysomnography, a multiple sleep latency test, parent-completed behavioral rating scales, cognitive testing, and psychiatric evaluation. The RCREC were computed as previously described for delta, theta, alpha, sigma, and beta EEG frequency bands. Participants included 133 children, 109 with OSA (apnea-hypopnea index [AHI] ≥ 1.5, mean 8.3 ± 10.6) and 24 without OSA (AHI 0.9 ± 0.3). At baseline, the arousal index and RCREC showed no consistent, significant associations with neurobehavioral morbidities, among all subjects or the 109 with OSA. At follow-up, the arousal index, RCREC, and neurobehavioral measures all tended to improve, but neither baseline measure of sleep fragmentation effectively predicted outcomes (all p > 0.05, with only scattered exceptions, among all subjects or those with OSA). Sleep fragmentation, as reflected by standard arousals or by RCREC, appears unlikely to explain neurobehavioral morbidity among children who undergo adenotonsillectomy. ClinicalTrials.gov, ID: NCT00233194.
Powathil, Gibin G.; Adamson, Douglas J. A.; Chaplain, Mark A. J.
2013-01-01
In this paper we use a hybrid multiscale mathematical model that incorporates both individual cell behaviour through the cell-cycle and the effects of the changing microenvironment through oxygen dynamics to study the multiple effects of radiation therapy. The oxygenation status of the cells is considered as one of the important prognostic markers for determining radiation therapy, as hypoxic cells are less radiosensitive. Another factor that critically affects radiation sensitivity is cell-cycle regulation. The effects of radiation therapy are included in the model using a modified linear quadratic model for the radiation damage, incorporating the effects of hypoxia and cell-cycle in determining the cell-cycle phase-specific radiosensitivity. Furthermore, after irradiation, an individual cell's cell-cycle dynamics are intrinsically modified through the activation of pathways responsible for repair mechanisms, often resulting in a delay/arrest in the cell-cycle. The model is then used to study various combinations of multiple doses of cell-cycle dependent chemotherapies and radiation therapy, as radiation may work better by the partial synchronisation of cells in the most radiosensitive phase of the cell-cycle. Moreover, using this multi-scale model, we investigate the optimum sequencing and scheduling of these multi-modality treatments, and the impact of internal and external heterogeneity on the spatio-temporal patterning of the distribution of tumour cells and their response to different treatment schedules. PMID:23874170
An investigation on impacts of scheduling configurations on Mississippi biology subject area testing
NASA Astrophysics Data System (ADS)
Marchette, Frances Lenora
The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education programs and the stress of testing on everyone involved in high-stakes testing.
Defense Acquisition Research Journal. Volume 21, Number 4, Issue 71, October 2014
2014-10-01
Military Sales and Direct Contractor Sales Strategies into Programs • Controlling Costs Throughout the Product Life Cycle • System Cyber Hardness GROUND...Power • Life Cycle Chart • iTunes • Defense Acquisition Guide Book iCatalog • Course Schedule • Equivalency Fulfillment • Predecessors/Prerequisites
40 CFR 600.109-08 - EPA driving cycles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and Carbon-Related Exhaust....115 of this chapter. (b) The highway fuel economy driving cycle is specified in this paragraph. (1) The Highway Fuel Economy Driving Schedule is set forth in appendix I of this part. The driving...
40 CFR 600.109-08 - EPA driving cycles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and Carbon-Related Exhaust....115 of this chapter. (b) The highway fuel economy driving cycle is specified in this paragraph. (1) The Highway Fuel Economy Driving Schedule is set forth in appendix I of this part. The driving...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2013 CFR
2013-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2012 CFR
2012-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2011 CFR
2011-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... Subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2014 CFR
2014-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
75 FR 26280 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... the Life Cycle Management Division (NWML) using one of the following means: Mail: NARA (NWML), 8601... indicate in their request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle... period, and balance. 4. Department of Education, Federal Student Aid (N1-441-09-23, 9 items, 9 temporary...
An Analysis of Rocket Propulsion Testing Costs
NASA Technical Reports Server (NTRS)
Ramirez-Pagan, Carmen P.; Rahman, Shamim A.
2009-01-01
The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.
16 CFR 1203.13 - Test schedule.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test schedule. 1203.13 Section 1203.13... STANDARD FOR BICYCLE HELMETS The Standard § 1203.13 Test schedule. (a) Helmet sample 1 of the set of eight... environments, respectively) shall be tested in accordance with the dynamic retention system strength test at...
School Schedules Affect Sleep Timing in Children and Contribute to Partial Sleep Deprivation
ERIC Educational Resources Information Center
Anacleto, Tâmile Stella; Adamowicz, Taísa; Simões da Costa Pinto, Laura; Louzada, Fernando Mazzilli
2014-01-01
Although the environmental light/dark cycle is the main zeitgeber for the human species, the social cues seem to be important in the synchronization of circadian rhythms. In Brazil, the existence of two school schedules--one with only morning classes (MG) and other with only afternoon classes (AG)--allows the investigation of the effect of school…
NASA Instrument Cost/Schedule Model
NASA Technical Reports Server (NTRS)
Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George
2011-01-01
NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.
Tolcher, Anthony W.; Messersmith, Wells A.; Mikulski, Stanislaw M.; Papadopoulos, Kyriakos P.; Kwak, Eunice L.; Gibbon, Darlene G.; Patnaik, Amita; Falchook, Gerald S.; Dasari, Arvind; Shapiro, Geoffrey I.; Boylan, John F.; Xu, Zhi-Xin; Wang, Ka; Koehler, Astrid; Song, James; Middleton, Steven A.; Deutsch, Jonathan; DeMario, Mark; Kurzrock, Razelle; Wheler, Jennifer J.
2012-01-01
Purpose To determine the maximum-tolerated dose (MTD) and assess safety, pharmacokinetics, pharmacodynamics, and evidence of antitumor activity of RO4929097, a gamma secretase inhibitor of Notch signaling in patients with advanced solid malignancies. Patients and Methods Patients received escalating doses of RO4929097 orally on two schedules: (A) 3 consecutive days per week for 2 weeks every 3 weeks; (B) 7 consecutive days every 3 weeks. To assess reversible CYP3A4 autoinduction, the expanded part of the study tested three dosing schedules: (B) as above; modified A, 3 consecutive d/wk for 3 weeks; and (C) continuous daily dosing. Positron emission tomography scans with [18F]fluorodeoxyglucose (FDG-PET) were used to assess tumor metabolic effects. Results Patients on schedule A (n = 58), B (n = 47), and C (n = 5; expanded cohort) received 302 cycles of RO4929097. Common grade 1 to 2 toxicities were fatigue, thrombocytopenia, fever, rash, chills, and anorexia. Transient grade 3 hypophosphatemia (dose-limiting toxicity, one patient) and grade 3 pruritus (two patients) were observed at 27 mg and 60 mg, respectively; transient grade 3 asthenia was observed on schedule A at 80 mg (one patient). Tumor responses included one partial response in a patient with colorectal adenocarcinoma with neuroendocrine features, one mixed response (stable disease) in a patient with sarcoma, and one nearly complete FDG-PET response in a patient with melanoma. Effect on CYP3A4 induction was observed. Conclusion RO4929097 was well tolerated at 270 mg on schedule A and at 135 mg on schedule B; the safety of schedule C has not been fully evaluated. Further studies are warranted on the basis of a favorable safety profile and preliminary evidence of clinical antitumor activity. PMID:22529266
Merritt, Michael L.
1997-01-01
This paper presents and interprets data from three cycles of injection, storage, and recovery of freshwater in a brackish aquifer through wells drilled at the Hialeah Water Treatment Plant in northeastern Dade County, Florida. Also described is an application of solute-transport modeling techniques to depict the hypothetical movement of the freshwater mass and to simulate the increasing salinity of the recovered water during the withdrawal phases. This paper also reports results of use of the calibrated model to predict recovery efficiencies in hypothetical future operational schedules of injection and recovery.
Software-Engineering Process Simulation (SEPS) model
NASA Technical Reports Server (NTRS)
Lin, C. Y.; Abdel-Hamid, T.; Sherif, J. S.
1992-01-01
The Software Engineering Process Simulation (SEPS) model is described which was developed at JPL. SEPS is a dynamic simulation model of the software project development process. It uses the feedback principles of system dynamics to simulate the dynamic interactions among various software life cycle development activities and management decision making processes. The model is designed to be a planning tool to examine tradeoffs of cost, schedule, and functionality, and to test the implications of different managerial policies on a project's outcome. Furthermore, SEPS will enable software managers to gain a better understanding of the dynamics of software project development and perform postmodern assessments.
1988-09-01
designed to compare the performance of grade 15W-40 (OE/HDO- 15/40), grade 40 (OE/HDO-40), and SAE -50 grade lubricants in M60 battle tanks and to verify...throughout the test period. Company A was to continue to use SAE -50 grade oil, Company B was to receive an OEIHDO-l3I40 oil, and Company C was to be...Company A procured the SAE -nO grade oil thdrough normal supply channels. 2 Each tank company was to follow regularly scheduled training cycles so that by
NASA Astrophysics Data System (ADS)
1981-09-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
NASA Technical Reports Server (NTRS)
1981-01-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
2013-01-01
of the Army’s Life Cycle Management Commands (LCMCs)—those for Aviation and Missiles (AMCOM), Communications - Electronics (CECOM), and Tank-automotive...took time from their busy schedules to participate in our interviews. We would like to thank Lieutenant Colonel John Coombs for helping us track down...Army Communications -Electronics Life Cycle Management Command CPFR collaborative planning, forecasting, and replenishment DCMA Defense Contract
Corrosion Preventive Compounds Lifetime Testing
NASA Technical Reports Server (NTRS)
Hale, Stephanie M.; Kammerer, Catherine C.; Copp, Tracy L.
2007-01-01
Lifetime Testing of Corrosion Preventive Compounds (CPCs) was performed to quantify performance in the various environments to which the Space Shuttle Orbiter is exposed during a flight cycle. Three CPCs are approved for use on the Orbiter: RD Calcium Grease, Dinitrol AV-30, and Braycote 601 EF. These CPCs have been rigorously tested to prove that they mitigate corrosion in typical environments, but little information is available on how they perform in the unique combination of the coastal environment at the launch pad, the vacuum of low-earth orbit, and the extreme heat of reentry. Currently, there is no lifetime or reapplication schedule established for these compounds that is based on this combination of environmental conditions. Aluminum 2024 coupons were coated with the three CPCs and exposed to conditions that simulate the environments to which the Orbiter is exposed. Uncoated Aluminum 2024 coupons were exposed to the environmental conditions as a control. Visual inspection and Electro- Impedance Spectroscopy (EIS) were performed on the samples in order to determine the effectiveness of the CPCs. The samples were processed through five mission life cycles or until the visual inspection revealed the initiation of corrosion and EIS indicated severe degradation of the coating.
Corrosion Preventive Compounds Lifetime Testing
NASA Technical Reports Server (NTRS)
Hale, Stephanie M.; Kammerer, Catherine C.
2007-01-01
Lifetime Testing of Corrosion Preventive Compounds (CPCs) was performed to quantify performance in the various environments to which the Space Shuttle Orbiter is exposed during a flight cycle. Three CPCs are approved for use on the Orbiter: HD Calcium Grease, Dinitrol AV-30, and Braycote 601 EF. These CPCs have been rigorously tested to prove that they mitigate corrosion in typical environments, but little information is available on how they perform in the unique combination of the coastal environment at the launch pad, the vacuum of low-earth orbit, and the extreme heat of reentry. Currently, there is no lifetime or reapplication schedule established for these compounds that is based on this combination of environmental conditions. Aluminum 2024 coupons were coated with the three CPCs and exposed to conditions that simulate the environments to which the Orbiter is exposed. Uncoated Aluminum 2024 coupons were exposed to the environmental conditions as a control. Visual inspection and Electro- Impedance Spectroscopy (EIS) were performed on the samples in order to determine the effectiveness of the CPCs. The samples were processed through five mission life cycles or until the visual inspection revealed the initiation of corrosion and EIS indicated severe degradation of the coating.
Multivariable control of vapor compression systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
He, X.D.; Liu, S.; Asada, H.H.
1999-07-01
This paper presents the results of a study of multi-input multi-output (MIMO) control of vapor compression cycles that have multiple actuators and sensors for regulating multiple outputs, e.g., superheat and evaporating temperature. The conventional single-input single-output (SISO) control was shown to have very limited performance. A low order lumped-parameter model was developed to describe the significant dynamics of vapor compression cycles. Dynamic modes were analyzed based on the low order model to provide physical insight of system dynamic behavior. To synthesize a MIMO control system, the Linear-Quadratic Gaussian (LQG) technique was applied to coordinate compressor speed and expansion valve openingmore » with guaranteed stability robustness in the design. Furthermore, to control a vapor compression cycle over a wide range of operating conditions where system nonlinearities become evident, a gain scheduling scheme was used so that the MIMO controller could adapt to changing operating conditions. Both analytical studies and experimental tests showed that the MIMO control could significantly improve the transient behavior of vapor compression cycles compared to the conventional SISO control scheme. The MIMO control proposed in this paper could be extended to the control of vapor compression cycles in a variety of HVAC and refrigeration applications to improve system performance and energy efficiency.« less
Cocker, David R; Shah, Sandip D; Johnson, Kent; Miller, J Wayne; Norbeck, Joseph M
2004-04-01
Information about in-use emissions from diesel engines remains a critical issue for inventory development and policy design. Toward that end, we have developed and verified the first mobile laboratory that measures on-road or real-world emissions from engines at the quality level specified in the U.S. Congress Code of Federal Regulations. This unique mobile laboratory provides information on integrated and modal regulated gaseous emission rates and integrated emission rates for speciated volatile and semivolatile organic compounds and particulate matter during real-world operation. Total emissions are captured and collected from the HDD vehicle that is pulling the mobile laboratory. While primarily intended to accumulate data from HDD vehicles, it may also be used to measure emission rates from stationary diesel sources such as back-up generators. This paper describes the development of the mobile laboratory, its measurement capabilities, and the verification process and provides the first data on total capture gaseous on-road emission measurements following the California Air Resources Board (ARB) 4-mode driving cycle, the hot urban dynamometer driving schedule (UDDS), the modified 5-mode cycle, and a 53.2-mi highway chase experiment. NOx mass emission rates (g mi(-1)) for the ARB 4-mode driving cycle, the hot UDDS driving cycle, and the chase experimentwerefoundto exceed current emission factor estimates for the engine type tested by approximately 50%. It was determined that congested traffic flow as well as "off-Federal Test Procedure cycle" emissions can lead to significant increases in per mile NOx emission rates for HDD vehicles.
Status of Tropospheric Emissions: Monitoring of Pollution (TEMPO)
NASA Astrophysics Data System (ADS)
Chance, K.; Liu, X.; Suleiman, R. M.; Flittner, D. E.; Al-Saadi, J. A.; Janz, S. J.
2016-12-01
TEMPO is now in the Assembly, Integration and Test (AI&T) phase, having passed its Key Decision Point C, Critical Design Reviews (CDRs) for the instrument and the ground systems, and the Test Readiness Review (TRR). The TEMPO instrument is scheduled for delivery in August 2017. The request for proposals to host TEMPO on a commercial geostationary satellite is scheduled for release by May 2017, with host selection hopefully completed by the end of calendar 2017. TEMPO is thus on schedule to measure atmospheric pollution for greater North America from space using ultraviolet and visible spectroscopy. TEMPO measures from Mexico City and Cuba to the Canadian oil sands, and from the Atlantic to the Pacific, hourly and at high spatial resolution. It provides a measurement suite that includes the key elements of tropospheric air pollution chemistry. Measurements are from geostationary (GEO) orbit, to capture the high variability in the diurnal cycle of emissions and chemistry. The small spatial footprint resolves pollution sources at sub-urban scale. Together, this temporal and spatial resolution improves emission inventories, monitors population exposure, and enables effective emission-control strategies.TEMPO takes advantage of a GEO host spacecraft to provide a mission that measures the spectra required to retrieve O3, NO2, SO2, H2CO, C2H2O2, H2O, aerosols, cloud parameters, and UVB radiation. TEMPO thus measures the major elements, directly or by proxy, in the tropospheric O3 chemistry cycle. Multi-spectral observations provide sensitivity to O3 in the lowermost troposphere, substantially reducing uncertainty in air quality predictions. TEMPO quantifies and tracks the evolution of aerosol loading. It provides near-real-time air quality products that will be made widely, publicly available.TEMPO provides much of the atmospheric measurement capability recommended for GEO-CAPE in the 2007 National Research Council Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond. Instruments from Europe (Sentinel 4) and Asia (GEMS) will form parts of a global GEO constellation for pollution monitoring later this decade, with a major focus on intercontinental pollution transport. TEMPO will launch at a prime time to be a component of this constellation.
NASA Astrophysics Data System (ADS)
1980-06-01
Fabrication of the inductor motor, the flywheel, the power conditioner, and the system control is described. Test results of the system operating over the SAE j227a Schedule D driving cycle are given and are compared to the calculated value. The flywheel energy storage system consists of a solid rotor, synchronous, inductor-type, flywheel drive machine electrically coupled to a dc battery electric propulsion system through a load-commutated inverter. The motor/alernator unit is coupled mechanically to a small steel flywheel which provides a portion of the vehicle's accelerating energy and regenerates the vehicle's braking energy. Laboratory simulation of the electric vehicle propulsion system included a 108 volt, lead-acid battery bank and a separately excited dc propulsion motor coupled to a flywheel and generator which simulate the vehicle's inertia and losses.
MHD retrofit of steam power plants. Feasibility study. Summary and conclusions, Part I
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-07-01
The US Department of Energy Division of Magnetohydrodynamics (DOE/MHD) initiated this study to evaluate the feasibility of a retrofit option to reduce the time and cost of commercializing MHD. The MHD retrofit option will integrate a nominal 260 megawatt thermal (MWt) MHD topping cycle into an existing or scheduled private utility steam plant; this facility will test both the MHD system and the combined operation of the MHD/steam plant. The 260 MWt input level was determined to be the size which could most effectively demonstrate and verify the engineering design and operational characteristics of a coal-fired, open-cycle, MHD power plant.more » Details are presented. A goal of the MHD program is to have operational by the year 2003 a commercial size, fully integrated MHD plant. This would be accomplished by demonstrating commercial scale, baseload performance of a fully integrated, MHD/steam power plant. (WHK)« less
NASA Technical Reports Server (NTRS)
Hays, D.
1982-01-01
Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.
1994-12-01
Order Cycle ..... 20 2. Order Processing and the Information System .......... ................. 21 3. The Order Cycle at SCCB ...... ......... 21 v...order transmittal time, order processing time, order assembly time, stock availability, production time, and delivery time. CUSTOMER L7 2 I i u *r1...methods, inventory stocking policies, order processing procedures, transport modes, and scheduling methods [Ref. 15]. 20 2. Order Processing and the
Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH
Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok
2018-01-01
Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology. PMID:29659508
Expert system for on-board satellite scheduling and control
NASA Technical Reports Server (NTRS)
Barry, John M.; Sary, Charisse
1988-01-01
An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.
Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.
Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok
2018-04-16
Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
Cost and schedule estimation study report
NASA Technical Reports Server (NTRS)
Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon
1993-01-01
This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.
Scheduling Earth Observing Fleets Using Evolutionary Algorithms: Problem Description and Approach
NASA Technical Reports Server (NTRS)
Globus, Al; Crawford, James; Lohn, Jason; Morris, Robert; Clancy, Daniel (Technical Monitor)
2002-01-01
We describe work in progress concerning multi-instrument, multi-satellite scheduling. Most, although not all, Earth observing instruments currently in orbit are unique. In the relatively near future, however, we expect to see fleets of Earth observing spacecraft, many carrying nearly identical instruments. This presents a substantially new scheduling challenge. Inspired by successful commercial applications of evolutionary algorithms in scheduling domains, this paper presents work in progress regarding the use of evolutionary algorithms to solve a set of Earth observing related model problems. Both the model problems and the software are described. Since the larger problems will require substantial computation and evolutionary algorithms are embarrassingly parallel, we discuss our parallelization techniques using dedicated and cycle-scavenged workstations.
The role of fracture mechanics in the design of fuel tanks in space vehicles
NASA Technical Reports Server (NTRS)
Denton, S. J.; Liu, C. K.
1976-01-01
With special reference to design of fuel tanks in space vehicles, the principles of fracture mechanics are reviewed. An approximate but extremely simple relationship is derived among the operating stress level, the length of crack, and the number of cycles of failure. Any one of the variables can be computed approximately from the knowledge of the other two, if the loading schedule (mission of the tank) is not greatly altered. Two sample examples illustrating the procedures of determining the allowable safe operating stress corresponding to a set of assumed loading schedule are included. The selection of sample examples is limited by the relatively meager available data on the candidate material for various stress ratios in the cycling.
Desensitization to rituximab in a multidisciplinary setting.
Amorós-Reboredo, Patrícia; Sánchez-López, Jaime; Bastida-Fernández, Carla; do Pazo-Oubiña, Fernando; Borràs-Maixenchs, Núria; Giné, Eva; Valero, Antonio; Creus-Baró, Natàlia
2015-10-01
The need to offer first-line therapy to the increasing number of patients who have suffered an hypersensitivity reaction has stimulated the use of rapid desensitization protocols. To present our experience working as a multidisciplinary team using a rituximab rapid desensitization scheme. Patient demographics, allergic reaction, skin tests to rituximab, number of desensitizations, reactions during the desensitization protocol and actions taken, number of administered and completed cycles, were retrospectively collected in patients who received at least one desensitization to rituximab. Number of desensitizations successfully managed. Between 2012 and June 2013 five patients received a total of 19 desensitizations to rituximab using a 12 step rapid desensitization protocol. All patients received the scheduled chemotherapeutic cycles as inpatients, with no delay in administration dates. Three patients presented a hypersensitivity reaction during the first desensitization and in one patient the event occurred again during the second treatment cycle. All reactions occurred in the last step, when the infusion rate reached the maximum speed. The developed protocol for rapid desensitization was successful in five patients receiving rituximab. Patients could receive the full intended dose.
Quantifying and understanding reproductive allocation schedules in plants.
Wenk, Elizabeth Hedi; Falster, Daniel S
2015-12-01
A plant's reproductive allocation (RA) schedule describes the fraction of surplus energy allocated to reproduction as it increases in size. While theorists use RA schedules as the connection between life history and energy allocation, little is known about RA schedules in real vegetation. Here we review what is known about RA schedules for perennial plants using studies either directly quantifying RA or that collected data from which the shape of an RA schedule can be inferred. We also briefly review theoretical models describing factors by which variation in RA may arise. We identified 34 studies from which aspects of an RA schedule could be inferred. Within those, RA schedules varied considerably across species: some species abruptly shift all resources from growth to reproduction; most others gradually shift resources into reproduction, but under a variety of graded schedules. Available data indicate the maximum fraction of energy allocated to production ranges from 0.1 to 1 and that shorter lived species tend to have higher initial RA and increase their RA more quickly than do longer-lived species. Overall, our findings indicate, little data exist about RA schedules in perennial plants. Available data suggest a wide range of schedules across species. Collection of more data on RA schedules would enable a tighter integration between observation and a variety of models predicting optimal energy allocation, plant growth rates, and biogeochemical cycles.
Activity-rest schedules in physically demanding work and the variation of responses with age.
Kakarot, Nadine; Mueller, Friedrich; Bassarak, Claudia
2012-01-01
Workers in physically demanding occupations require work breaks to recover from exertion. In a laboratory setting, we investigated the impact of ergometer cycling for 7 h in two conditions with an identical total break time but with two different activity-rest schedules. We hypothesised that more frequent but shorter breaks lead to less psychophysical strain and its effects than do less frequent but longer breaks, particularly for older workers. Twenty-nine participants representing three different age groups were tested in both conditions. Heart rate, perceived exertion/tension and feelings of fatigue were assessed and used as dependent variables. Results indicate no general activity-rest differences as well as no age-related differences of break effects under the condition of subjectively equal straining load. However, heart rate was found to be lower at some measurement points in the frequent-short-break condition and perceived exertion was lower in the infrequent-long-break condition. Design of activity-rest schedules in physically demanding occupations is a key issue in the prevention of strain and hence of interest to ergonomists. Our study suggests that breaks during physically demanding work have the same effect if they are frequent and short or infrequent and long, regardless of age.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Schedule C-prototype tests for calibration or reference... Licensed Items § 32.102 Schedule C—prototype tests for calibration or reference sources containing..., conduct prototype tests, in the order listed, on each of five prototypes of the source, which contains...
Understanding Acquisition Cycle Time: Focusing the Research Problem
2013-11-01
Browning, Tyson R., and Steven D. Eppinger. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE...2009. Clark, Kim, and Steven Wheelwright. Revolutionizing Development: Quantum Leaps in Speed, Efficiency and Quality. New York, NY: The Free Press...1992. Cross, Steven M. Data Analysis and its Impact on Predicting Schedule and Cost Risk. AFIT/GIR/ENC/06M-01. Wright-Patterson AFB OH: AFIT
Najam, Rahila; Mateen, Ahmed
2013-01-01
The study is designed to assess the frequency and severity of few dose limiting neurological adverse effects of four different schedules of FOLFOX. Patients with histologically confirmed advanced colorectal carcinoma (CRC) were included in the study. Toxicity was graded according to CTC v 2.0. The frequency of grade 3 and 4 adverse effects was comparatively assessed in each treatment arm. The difference in the pattern of toxicity between the treatment schedule was evaluated. The most frequent adverse symptom of neurological adverse effect was grade 1 paresthesia in the patients treated with FOLFOX4 schedule. Grade 4 peripheral neuropathy was reported in few patients of FOLFOX7 treatment arm. Frequency and onset of neurological adverse effects like paresthesia, dizziness, and hypoesthesia were significantly different (P < 0.05), whereas frequency and onset of peripheral neuropathy were highly significant (P < 0.01) in each treatment arm of FOLFOX. Peripheral neuropathy was associated with electrolyte imbalance and diabetes in few patients. Frequency of symptoms, for example, paresthesia, is associated with increased number of recurrent exposure to oxaliplatin (increased number of cycles) even at low doses (85 mg/m2), whereas severity of symptoms, for example, peripheral neuropathy, is associated with higher dose (130 mg/m2) after few treatment cycles. PMID:24187619
Code of Federal Regulations, 2011 CFR
2011-07-01
... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...
Code of Federal Regulations, 2012 CFR
2012-07-01
... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...
Code of Federal Regulations, 2010 CFR
2010-07-01
... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...
Code of Federal Regulations, 2013 CFR
2013-07-01
... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...
Enhancing the revenue cycle experience for patients.
Consolver, Patti; Phillips, Scott
2014-09-01
In 2013, Texas Health Resources began to record discussions with patients at each revenue cycle touch point, from scheduling through registration. The recordings give leaders insight on the accuracy and consistency of information communicated at each touch point and provide a tool for improving customer service. The initiative has improved patient satisfaction and increased point-of-service collections.
78 FR 19585 - Drawbridge Operation Regulations; China Basin, San Francisco, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... scheduled CycleSF, a community event. This deviation allows the bridge to remain in the closed-to-navigation... above Mean High Water in the closed-to-navigation position. The draw opens on signal if at least one... allow participants in the CycleSF to cross the bridge during the event. This temporary deviation has...
Lunar Regenerative Fuel Cell (RFC) Reliability Testing for Assured Mission Success
NASA Technical Reports Server (NTRS)
Bents, David J.
2009-01-01
NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) Regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated," these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development.When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
Heber Binary Project. Binary Cycle Geothermal Demonstration Power Plant (RP1900-1)
NASA Astrophysics Data System (ADS)
Lacy, R. G.; Nelson, T. T.
1982-12-01
The Heber Binary Project (1) demonstrates the potential of moderate temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology; (2) allows the scaling up and evaluation of the performance of binary cycle technology in geothermal service; (3) establishes schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants; and (4) resolves uncertainties associated with the reservoir performance, plant operation, and economics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This appendix summarizes building characteristics used to determine heating and cooling loads for each of the five building types in each of the four regions. For the selected five buildings, the following data are attached: new and existing construction characteristics; new and existing construction thermal resistance; floor plan and elevation; people load schedule; lighting load schedule; appliance load schedule; ventilation schedule; and hot water use schedule. For the five building types (single family, apartment buildings, commercial buildings, office buildings, and schools), data are compiled in 10 appendices. These are Building Characteristics; Alternate Energy Sources and Energy Conservation Techniques Description, Costs,more » Fuel Price Scenarios; Life Cycle Cost Model; Simulation Models; Solar Heating/Cooling System; Condensed Weather; Single and Multi-Family Dwelling Characteristics and Energy Conservation Techniques; Mixed Strategies for Energy Conservation and Alternative Energy Utilization in Buildings. An extensive bibliography is given in the final appendix. (MCW)« less
10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for a license pursuant to § 32.61 shall conduct prototype tests on each of five prototype ice detection...
10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for a license pursuant to § 32.61 shall conduct prototype tests on each of five prototype ice detection...
10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for a license pursuant to § 32.61 shall conduct prototype tests on each of five prototype ice detection...
Computational Analysis of the Combustion Processes in an Axisymmetric, RBCC Flowpath
NASA Technical Reports Server (NTRS)
Steffen, Christopher J., Jr.; Yungster, Shaye
2001-01-01
Computational fluid dynamic simulations have been used to study the combustion processes within an axisymmetric, RBCC flowpath. Two distinct operating modes have been analyzed to date, including the independent ramjet stream (IRS) cycle and the supersonic combustion ramjet (scramJet) cycle. The IRS cycle investigation examined the influence of fuel-air ratio, fuel distribution, and rocket chamber pressure upon the combustion physics and thermal choke characteristics. Results indicate that adjustment of the amount and radial distribution of fuel can control the thermal choke point. The secondary massflow rate was very sensitive to the fuel-air ratio and the rocket chamber pressure. The scramjet investigation examined the influence of fuel-air ratio and fuel injection schedule upon combustion performance estimates. An analysis of the mesh-dependence of these calculations was presented. Jet penetration data was extracted from the three-dimensional simulations and compared favorably with experimental correlations of similar flows. Results indicate that combustion efficiency was very sensitive to the fuel schedule.
Relocation of the Cryo-Test Facility to NASA-MSFC
NASA Technical Reports Server (NTRS)
Sisco, Jimmy D.; McConnaughey, Paul K. (Technical Monitor)
2002-01-01
The Environmental Test Facility (ETF), located at NASA-Marshall Space Flight Center, Huntsville, Alabama, has provided thermal vacuum testing for several major programs since the 1960's. The ETF consists of over 13 thermal vacuum chambers sized and configured to handle the majority of test payloads. Testing is performed around the clock with multiple tests being conducted simultaneously. Chamber selection to achieve the best match with test articles and juggling program schedules, at times, can be a challenge. The ETF's Sunspot chamber has had tests scheduled and operated back-to-back for several years and provides the majority of schedule conflicts. Future test programs have been identified which surpass the current Sunspot availability. This paper describes a very low cost alternate to reduce schedule conflicts by utilizing government excess equipment
Nonentrained circadian rhythms of melatonin in submariners scheduled to an 18-hour day.
Kelly, T L; Neri, D F; Grill, J T; Ryman, D; Hunt, P D; Dijk, D J; Shanahan, T L; Czeisler, C A
1999-06-01
The human circadian timing system has previously been shown to free run with a period slightly longer than 24 h in subjects living in the laboratory under conditions of forced desynchrony. In forced desynchrony, subjects are shielded from bright light and periodic time cues and are required to live on a day length outside the range of circadian entrainment. The work schedule used for most personnel aboard American submarines is 6 h on duty alternating with 12 h off duty. This imposed 18-h cycle is too short for human circadian synchronization, especially given that there is no bright-light exposure aboard submarines. However, crew members are exposed to 24-h stimuli that could mediate synchronization, such as clocks and social contacts with personnel who are living on a 24-h schedule. The authors investigated circadian rhythms of salivary melatonin in 20 crew members during a prolonged voyage on a Trident nuclear submarine. The authors found that in crew members living on the 18-h duty cycle, the endogenous rhythm of melatonin showed an average period of 24.35 h (n = 12, SD = 0.18 h). These data indicate that social contacts and knowledge of clock time are insufficient for entrainment to a 24-h period in personnel living by an 18-h rest-activity cycle aboard a submarine.
NASA Astrophysics Data System (ADS)
Dixit, Poornima; Miller, J. Wayne; Cocker, David R.; Oshinuga, Adewale; Jiang, Yu; Durbin, Thomas D.; Johnson, Kent C.
2017-10-01
Emissions from eight heavy-duty diesel trucks (HDDTs) equipped with three different exhaust aftertreatment systems (ATS) for controlling nitrogen oxide (NOx) emissions were quantified on a chassis dynamometer using driving schedules representative of stop-and-go and free-flow driving in metropolitan areas. The three control technologies were: 1) cooled exhaust gas recirculation (CEGR) plus a diesel particulate filter (DPF); 2) CEGR and DPF plus advanced engine controls; and 3) CEGR and DPF plus selective catalytic reduction with ammonia (SCR). Results for all control technologies and driving conditions showed PM emission factors were less than the standard, while selected non-regulated emissions (ammonia, carbonyls, and C4-C12 hydrocarbons) and a greenhouse gas (nitrous oxide) were at measurement detection limits. However, NOx emission factors depended on the control technology, engine calibration, and driving mode. For example, emissions from engines with cooled-exhaust gas recirculation (CEGR) were 239% higher for stop-and-go driving as compared with free-flow. For CEGR plus selective catalytic reduction (SCR), the ratio was 450%. A deeper analysis was carried out with the assumption that emissions measured for a drive cycle on either the chassis or in-use driving would be similar. Applying the same NTE rules to the chassis data showed emissions during stop-and-go driving often exceeded the certification standard and >90% of the driving did not fall within the Not-To-Exceed (NTE) control area suggesting the NTE requirements do not provide sufficient emissions control under in-use conditions. On-road measurement of emissions using the same mobile lab while the vehicle followed a free-flow driving schedule verified the chassis results. These results have implications for scientists who build inventories using certification values instead of real world emission values and for metropolitan populations, who are exposed to elevated emissions. The differences in values between real world emissions and certification cycles should be narrowed. For example, one might use a different mix of cold and hot start testing to greater emphasize low temperature/load operation, a separate cycle to specifically characterize low-load operation, or broaden the in-use compliance testing requirements and associated conformity factors to incorporate a wider envelope of vehicle operation, especially at low load conditions. .
Direct Digital Control of HVAC (Heating, Ventilating, and Air Conditioning).
1985-01-01
controller func- tions such as time-of-day, economizer cycles, reset, load shedding, chiller optimization , VAV fan synchronization, and optimum start/stop...control system such as that illustrated in Fig- urc 4. Data on setpoints , reset schedules, and event timing, such as that presented in Figure 6, are...program code (Figure 7). In addition to the control logic, setpoint and other data are readily available. Program logi:, setpoint and schedule data, and
2013-01-01
Background Both oral contraceptive pills (OCPs) and estradiol (E2) valerate have been used to schedule gonadotropin-releasing hormone (GnRH) antagonist in vitro fertilization (IVF) cycles and, consequently, laboratory activities. However, there are no studies comparing treatment outcomes directly between these two pretreatment methods. This randomized controlled trial was aimed at finding differences in ongoing pregnancy rates between GnRH antagonist IVF cycles scheduled with OCPs or E2 valerate. Methods Between January and May 2012, one hundred consecutive patients (nonobese, regularly cycling women 18–38 years with normal day 3 hormone levels and <3 previous IVF/ICSI attempts) undergoing IVF with the GnRH antagonist protocol were randomized to either the OCP or E2 pretreatment arms, with no restrictions such as blocking or stratification. Authors involved in data collection and analysis were blinded to group assignment. Fifty patients received OCP (30 μg ethinyl E2/150 μg levonorgestrel) for 12–16 days from day 1 or 2, and stimulation was started 5 days after stopping OCP. Similarly, 50 patients received 4 mg/day oral E2 valerate from day 20 for 5–12 days, until the day before starting stimulation. Results Pretreatment with OCP (mean±SD, 14.5±1.7 days) was significantly longer than with E2 (7.8±1.9 days). Stimulation and embryological characteristics were similar. Ongoing pregnancy rates (46.0% vs. 44.0%; risk difference, –2.0% [95% CI –21.2% to 17.3%]), as well as implantation (43.5% vs. 47.4%), clinical pregnancy (50.0% vs. 48.0%), clinical miscarriage (7.1% vs. 7.7%), and live birth (42.0% vs. 40.0%) rates were comparable between groups. Conclusions This is the first study to directly compare these two methods of cycle scheduling in GnRH antagonist cycles. Our results fail to show statistically significant differences in ongoing pregnancy rates between pretreatment with OCP and E2 for IVF with the GnRH antagonist protocol. Although the study is limited by its sample size, our results may contribute to a future meta-analysis. An interesting future direction would be to extend our study to women with decreased ovarian reserve, as these are the patients in whom an increase in oocyte yield—due to the hypothetical beneficial effect of steroid pretreatment on follicular synchronization—could more easily be demonstrated. Trial registration ClinicalTrials.gov http://NCT01501448. PMID:24074027
Sex differences in methamphetamine seeking in rats: Impact of oxytocin
Cox, Brittney M.; Young, Amy B.; See, Ronald E.; Reichel, Carmela M.
2013-01-01
Previous evidence in an animal model of drug self-administration and drug seeking showed that acute oxytocin decreased methamphetamine (meth) seeking in male rats, suggesting potential clinical efficacy for the treatment of psychostimulant addiction. However, based on the well-established role of oxytocin in reproduction and pair bond formation, it is important to know how this effect extrapolates to females. Here, we tested whether oxytocin (1 mg/kg, IP) would decrease meth seeking in female rats across various stages of the estrous cycle (Experiment 1). Freely cycling Long Evans female rats self-administered meth (IV) in 2-h daily sessions, followed by daily extinction sessions. Following extinction, rats received oxytocin (0, 0.3, or 1 mg/kg, IP) 30 min before a meth priming injection (1 mg/kg, IP) to assess reinstatement of meth seeking. Next, we examined the effects of oxytocin on motivated meth- and sucrose-taking and seeking in male and female rats. In separate experiments, males and females self-administered meth (Experiment 2) or sucrose (Experiment 3) until responding was stabilized along a fixed ratio (FR) 5 schedule of reinforcement. Subsequently, rats received either oxytocin or vehicle prior to self-administration along a progressive ratio (PR) schedule of reinforcement. Rats were subsequently tested for cue-, meth-, and stress-induced reinstatement after pretreatment with oxytocin or vehicle. While oxytocin reduced meth seeking in females, we found that estrous cycle stage (as determined from vaginal cytology) did not influence meth-primed reinstatement or the ability of oxytocin to decrease reinstatement of meth seeking. Oxytocin reduced PR responding for meth only in females. Females responded more than males during cue-induced reinstatement of meth and sucrose seeking, and oxytocin reduced this responding only in meth females. In both sexes, oxytocin attenuated meth seeking in response to a meth prime and yohimbine (a pharmacological stressor). The results suggest that oxytocin may have efficacy as a treatment of meth addiction in both sexes; however, females may show greater response to oxytocin treatment for the prevention of relapse. PMID:23764194
Oba, Takaaki; Maeno, Kazuma; Ito, Kenichi; Ishizone, Satoshi; Hanaoka, Takaomi
2017-11-01
When acute appendicitis occurs in patients treated with chemotherapy, neutropenia and abdominal complaints caused by chemotherapy can contribute to the diagnostic difficulty, masking the increase in white blood cell(WBC)counts and physical findings of acute appendicitis. A 43-year-old premenopausal woman who was diagnosed with stage IIIA left breast cancer was scheduled for neoadjuvant chemotherapy includingfluorouracil plus epirubicin plus cyclophosphamide(FEC), followed by docetaxel and trastuzumab(DOC plus HER). The patient developed fever and lower abdominal pain on day 17 of DOC plus HER cycle 1, and was diagnosed with acute gastroenteritis in the emergency room. These symptoms were almost improved 4 days later, and then cycle 2 was performed as scheduled. WBC counts decreased to 1,530 cells/mL due to DOCinduced myelosuppression on day 8 of cycle 2 when the patient developed lower abdominal pain again. However, WBC counts increased to 21,680 cells/mL on day 13 of cycle 2. Computed tomography scans revealed an intraperitoneal abscess due to acute appendicitis, and consequently urgent operation was performed. It is necessary to understand that patients with acute appendicitis duringchemotherapy can present less clinical findings.
Jiang, Yu; Yang, Jiacheng; Cocker, David; Karavalakis, Georgios; Johnson, Kent C; Durbin, Thomas D
2018-04-01
The regulated emissions of five 2012 and newer, low-mileage, heavy-duty Class 8 diesel trucks equipped with diesel particulate filters (DPFs) and selective catalytic reduction (SCR) systems were evaluated over test cycles representing urban, highway, and stop-and-go driving on a chassis dynamometer. NOx emissions over the Urban Dynamometer Driving Schedule (UDDS) ranged from 0.495 to 1.363g/mi (0.136 to 0.387g/bhp-hr) for four of the normal emitting trucks. For those trucks, NOx emissions were lowest over the cruise (0.068 to 0.471g/mi) and high-speed cruise (0.067 to 0.249g/mi) cycles, and highest for the creep cycle (2.131 to 9.468g/mi). A fifth truck showed an anomaly in that it had never regenerated throughout its relatively short operating lifetime due to its unusual, unladed service history. This truck exhibited NOx emissions of 3.519g/mi initially over the UDDS, with UDDS NOx emissions decreasing to 0.39g/mi after a series of parked regenerations. PM, THC, and CO emissions were found to be very low for most of the testing conditions, due to the presence of the DPF/SCR aftertreatment system, and were comparable to background levels in some cases. Copyright © 2017 Elsevier B.V. All rights reserved.
Reliability and validity of four alternative definitions of rapid-cycling bipolar disorder.
Maj, M; Pirozzi, R; Formicola, A M; Tortorella, A
1999-09-01
This study tested the reliability and validity of four definitions of rapid cycling. Two trained psychiatrists, using the Schedule for Affective Disorders and Schizophrenia, independently assessed 210 patients with bipolar disorder. They checked whether each patient met four definitions of rapid cycling: one consistent with DSM-IV criteria, one waiving criteria for duration of affective episodes, one waiving such criteria and requiring at least one switch from mania to depression or vice versa during the reference year, and one waiving duration criteria and requiring at least 8 weeks of fully symptomatic affective illness during the reference year. The interrater reliability was calculated by Cohen's kappa statistic. Patients who met each definition according to both psychiatrists were compared to those who did not meet any definition (nonrapid-cycling group) on demographic and clinical variables. All patients were followed up for 1 year. Kappa values were 0.93, 0.73, 0.75, and 0.80, respectively, for the four definitions of rapid cycling. The groups meeting the second and third definitions included significantly more female and bipolar II patients than did the nonrapid-cycling group. Those two groups also had the lowest proportion of patients with a favorable lithium prophylaxis outcome and the highest stability of the rapid-cycling pattern on follow-up. The four groups of rapid-cycling patients did not differ significantly among themselves on any of the assessed variables. The expression "rapid cycling" encompasses a spectrum of conditions. The DSM-IV definition, although quite reliable, covers only part of this spectrum, and the conditions that are excluded are very typical in terms of key validators and are relatively stable over time.
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2011-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.
Mozessohn, Lee; Cheung, Matthew C; Fallahpour, Saber; Gill, Tripat; Maloul, Asmaa; Zhang, Liying; Lau, Olivia; Buckstein, Rena
2018-06-01
The outcome of myelodysplastic syndrome (MDS) patients with uniformly higher-risk disease treated with azacitidine (AZA) in the 'real-world' remains largely unknown. We evaluated 1101 consecutive higher-risk MDS patients (International Prognostic Scoring System intermediate-2/high) and low-blast count acute myeloid leukaemia (AML; 21-30% blasts) patients treated in Ontario, Canada. By dosing schedule, 24·7% received AZA for seven consecutive days, 12·4% for six consecutive days and 62·9% by 5-2-2. Overall, median number of cycles was 6 (range 1-67) and 8 (range 6-14) when restricted to the 692 (63%) patients who received at least 4 cycles. The actuarial median survival was 11·6 months [95% confidence interval (CI) 10·7-12·4) for the entire cohort and 18·0 months (landmark analysis; 95% CI 16·6-19·1 months) for those receiving at least 4 cycles. There was no difference in overall survival (OS) between the 3 dosing schedules (P = 0·87). In our large 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML, we demonstrated a lower than expected OS. Reassuringly, survival did not differ by dosing schedules. The OS was higher in the 2/3 of patients who received at least 4 cycles of treatment, reinforcing the necessity of sustained administration until therapeutic benefits are realised. This represents the largest 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML. © 2018 John Wiley & Sons Ltd.
Lovell, R; Whalan, M; Marshall, P W M; Sampson, J A; Siegler, J C; Buchheit, M
2018-05-24
Scheduling eccentric-based injury prevention programs (IPP) during the common 6-day micro-cycle in soccer is challenged by recovery and tapering phases. This study profiled muscle damage, neuromuscular performance, and perceptual responses to a lower limb eccentric-based IPP administered 1 (MD+1) vs 3 days (MD+3) postmatch. A total of 18 semi-professional players were monitored daily during 3 in-season 6-day micro-cycles, including weekly competitive fixtures. Capillary creatine kinase concentration (CK), posterior lower limb isometric peak force (PF), counter-movement jump (CMJ) performance, and muscle soreness were assessed 24 hours prior to match-day (baseline), and every 24 hours up to 120 hours postmatch. The IPP consisted of lunges, single stiff leg dead-lifts, single leg-squats, and Nordic hamstring exercises. Performing the IPP on MD+1 attenuated the decline in CK normally observed following match play (CON: 142%; MD+3: 166%; small differences). When IPP was delivered on MD+3, CK was higher vs CON and MD+1 trials on both MD+4 (MD+3: 260%; CON: 146%; MD+1: 151%; moderate differences) and MD+5 (MD+3: 209%; CON: 125%; MD+1: 127%; small differences). Soreness ratings were not exacerbated when the IPP was delivered on MD+1, but when prescribed on MD+3, hamstring soreness ratings remained higher on MD+4 and MD+5 (small differences). No between-trial differences were observed for PF and CMJ. Administering the IPP in the middle of the micro-cycle (MD+3) increased measures of muscle damage and soreness, which remained elevated on the day prior to the next match (MD+5). Accordingly, IPP should be scheduled early in the micro-cycle, to avoid compromising preparation for the following match. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Mateos, Maria-Victoria; Oriol, Albert; Martínez-López, Joaquín; Teruel, Ana-Isabel; Bengoechea, Enrique; Palomera, Luis; de Arriba, Felipe; Esseltine, Dixie-Lee; Cakana, Andrew; Pei, Lixia; van de Velde, Helgi; Miguel, Jesus San
2016-12-01
Bortezomib-melphalan-prednisone (VMP) is a standard-of-care for previously untreated, transplant-ineligible multiple myeloma (MM). Here, we compared outcomes between VMP regimens in the VISTA trial (9-cycle VMP schedule, including 4 cycles of twice weekly bortezomib) and the PETHEMA/GEM05 trial (less intensive 6-cycle VMP schedule with 1 cycle of twice weekly and 5 cycles of weekly bortezomib, then bortezomib-based maintenance). A total of 113 patient pairs matched by propensity score (estimated using logistic regression and incorporating eight exposure/outcome-related parameters) were included in this retrospective analysis. Median cumulative bortezomib dose was higher in PETHEMA/GEM05 than VISTA (49.6 vs 37.0 mg/m 2 ); median dose intensity was lower (2.0 vs 5.1 mg/m 2 /month). Median progression-free survival (PFS) and time-to-progression (TTP) were significantly longer in PETHEMA/GEM05 than VISTA (PFS, 30.5 vs 20.0 months, p = 0.0265; TTP, 33.8 vs 24.2 months, p = 0.0049) after a median follow-up of 77.2 and 26.0 months, respectively. Median overall survival (OS) was similar (61.3 vs 61.0 months, p = 0.6528; median follow-up, 77.6 vs 60.1 months). Post-induction complete response rate was lower in PETHEMA/GEM05 than VISTA (19 vs 31 %; p = 0.03318); on-study (including maintenance) rate was similar (30 vs 31 %; p = 0.89437). This analysis suggests that the less-intensive PETHEMA/GEM05 VMP regimen plus maintenance may improve PFS and TTP, but not OS, compared with the VISTA VMP regimen. NCT00111319, NCT00443235.
Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.
2015-01-01
Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488
Budd, George T; Barlow, William E; Moore, Halle C F; Hobday, Timothy J; Stewart, James A; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K; Rinn, Kristine J; Albain, Kathy S; Chew, Helen K; Burton, Gary V; Moore, Timothy D; Srkalovic, Gordan; McGregor, Bradley A; Flaherty, Lawrence E; Livingston, Robert B; Lew, Danika L; Gralow, Julie R; Hortobagyi, Gabriel N
2015-01-01
To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor-negative/human epidermal growth factor receptor 2 (HER2) -negative tumors (P = .067), with no differences seen with hormone receptor-positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor-negative/HER2-negative tumors. © 2014 by American Society of Clinical Oncology.
Skin Temperature Rhythms in Humans Respond to Changes in the Timing of Sleep and Light.
Cuesta, Marc; Boudreau, Philippe; Cermakian, Nicolas; Boivin, Diane B
2017-06-01
Body temperature is known to vary with circadian phase and to be influenced by factors that can mask its circadian expression. We wanted to test whether skin temperature rhythms were sensitive to an abrupt shift of the sleep schedule and to the resetting effects of light. Nineteen healthy subjects spent 6 days in time isolation and underwent a simulated night-shift procedure. They were assigned to either a control group ( n = 10) or bright light group ( n = 9) and measurements were taken under a baseline day-oriented schedule and during the 4 th cycle of a night-oriented schedule. In the bright light group, participants were exposed to a 3-cycle 8-h exposure of ~6,500 lux at night, while the control group remained in dim light conditions (~3 lux). Skin temperature was recorded in 10 and 4 participants from the control and bright light groups, respectively. We found significant circadian rhythms of plasma melatonin, core body temperature (CBT), and skin temperature at baseline for both groups ( p < 0.001 for all). Rhythms of melatonin, CBT, and skin temperature following night shifts were significantly phase delayed by about 7 to 9 h ( p < 0.05) in response to bright light at night, whereas there was no shift in the control group. In addition, we found that at bedtime melatonin does not consistently increase before the increase in distal skin temperature and subsequent decrease in CBT, in contrast to what has been previously reported. The present study shows that, in constant posture conditions, skin temperature rhythms have an evoked component sensitive to abrupt changes in the timing of sleep. They also comprise an endogenous component that is sensitive to the resetting effects of bright light exposure. These results have applications for the determination of circadian phase, as skin temperature is less intrusive than rectal temperature recordings.
Users Guide to Direct Digital Control of Heating, Ventilating, and Air Conditioning Equipment,
1985-01-01
cycles, reset, load shedding, chiller optimization , VAV fan synchronization, and optimum start/stop. The prospective buyer of a DDC system should...in Fig- ure 4. Data on setpoints , reset schedules, and event timing, such as that presented in Figure 6, are often even more difficult to find. In con...control logic, setpoint and other data are readily available. Program logic, setpoint and schedule data, and other information stored in a DDC unit
Development of a Hospital Information System
1984-01-01
4~4and overused statement but true nonrAýheless. Arid, if some- "thing is information fur one and not Cor another, what is it for the latter? It is...scheduling your projects, fantastic! Keep doing itl If you schedule your projects according to a combination of your horoscope , the stock market, and...hospital functions. It is true that knowledge of the tools used in the Systems Development Life Cycle can allow one to go into 4.. any setting and
Circadian rhythm of intraocular pressure in the rat.
Moore, C G; Johnson, E C; Morrison, J C
1996-02-01
To define the characteristics of the diurnal variation of intraocular pressure (IOP) in eyes of awake rats, ten male brown Norway rats were entrained to a 12-hour light:12-hour dark (12L:12D) lighting schedule and were conditioned to IOP measurement with the TonoPen XL tonometer while awake, using only 0.5% proparacaine HCl anesthesia. The IOP measurements were performed in 4 experiments: Preliminary-IOP was measured at 6-hour intervals in both eyes of each animal, to determine correlation between right and left eyes; Light:Dark-lighting remained the same as in the preliminary experiment, but the measurement schedule was altered so that measurements were obtained at 4-hour intervals in alternating eyes, over two 24-hour light cycles; Dark:Dark-animals were placed in constant dark (0L:24D) and, after 72 h, measurements were obtained at 4-hour intervals in alternating eyes. Animals were then re-entrained to the previous 12L:12D schedule for 7 days, after which they were returned to constant dark and the experiment was repeated; and Dark:Light-animals were entrained to a reversed light:dark cycle (12D:12L) for 28 days, after which measurements were obtained in the same fashion as in the Light:Dark experiment. Close agreement was found between right- and left-eye IOPs. Animals on a 12L:12D schedule exhibited lowest IOP while the lights were on (19.3 +/- 1.9 mm Hg), and highest (31.3 +/- 1.3 mm Hg) while the lights were off. Pressure changes anticipated the change from light to dark and dark to light. This pattern persisted in constant dark, and was reversed when the cycle was changed to 12D:12L. Brown Norway rats possess a regular rhythm of IOP that is entrained by the cycle of light and dark, and persistence of this rhythm in constant dark establishes it as a circadian rhythm. Furthermore, our results indicate that reliable and physiologically meaningful IOP measurements can be obtained in awake rats using the TonoPen XL tonometer.
Aberrant light directly impairs mood and learning through melanopsin-expressing neurons.
LeGates, Tara A; Altimus, Cara M; Wang, Hui; Lee, Hey-Kyoung; Yang, Sunggu; Zhao, Haiqing; Kirkwood, Alfredo; Weber, E Todd; Hattar, Samer
2012-11-22
The daily solar cycle allows organisms to synchronize their circadian rhythms and sleep-wake cycles to the correct temporal niche. Changes in day-length, shift-work, and transmeridian travel lead to mood alterations and cognitive function deficits. Sleep deprivation and circadian disruption underlie mood and cognitive disorders associated with irregular light schedules. Whether irregular light schedules directly affect mood and cognitive functions in the context of normal sleep and circadian rhythms remains unclear. Here we show, using an aberrant light cycle that neither changes the amount and architecture of sleep nor causes changes in the circadian timing system, that light directly regulates mood-related behaviours and cognitive functions in mice. Animals exposed to the aberrant light cycle maintain daily corticosterone rhythms, but the overall levels of corticosterone are increased. Despite normal circadian and sleep structures, these animals show increased depression-like behaviours and impaired hippocampal long-term potentiation and learning. Administration of the antidepressant drugs fluoxetine or desipramine restores learning in mice exposed to the aberrant light cycle, suggesting that the mood deficit precedes the learning impairments. To determine the retinal circuits underlying this impairment of mood and learning, we examined the behavioural consequences of this light cycle in animals that lack intrinsically photosensitive retinal ganglion cells. In these animals, the aberrant light cycle does not impair mood and learning, despite the presence of the conventional retinal ganglion cells and the ability of these animals to detect light for image formation. These findings demonstrate the ability of light to influence cognitive and mood functions directly through intrinsically photosensitive retinal ganglion cells.
An on-time power-aware scheduling scheme for medical sensor SoC-based WBAN systems.
Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk
2012-12-27
The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network-a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.
An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems
Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk
2013-01-01
The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices. PMID:23271602
Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten
2013-01-01
Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).
NASA Astrophysics Data System (ADS)
Hanish Nithin, Anu; Omenzetter, Piotr
2017-04-01
Optimization of the life-cycle costs and reliability of offshore wind turbines (OWTs) is an area of immense interest due to the widespread increase in wind power generation across the world. Most of the existing studies have used structural reliability and the Bayesian pre-posterior analysis for optimization. This paper proposes an extension to the previous approaches in a framework for probabilistic optimization of the total life-cycle costs and reliability of OWTs by combining the elements of structural reliability/risk analysis (SRA), the Bayesian pre-posterior analysis with optimization through a genetic algorithm (GA). The SRA techniques are adopted to compute the probabilities of damage occurrence and failure associated with the deterioration model. The probabilities are used in the decision tree and are updated using the Bayesian analysis. The output of this framework would determine the optimal structural health monitoring and maintenance schedules to be implemented during the life span of OWTs while maintaining a trade-off between the life-cycle costs and risk of the structural failure. Numerical illustrations with a generic deterioration model for one monitoring exercise in the life cycle of a system are demonstrated. Two case scenarios, namely to build initially an expensive and robust or a cheaper but more quickly deteriorating structures and to adopt expensive monitoring system, are presented to aid in the decision-making process.
Production scheduling and rescheduling with genetic algorithms.
Bierwirth, C; Mattfeld, D C
1999-01-01
A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
40 CFR 86.535-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... minutes. Engine startup (with all accessories turned off), operation over the driving schedule, and engine... driving schedule complete the hot start test. The exhaust emissions are diluted with ambient air and a... Administrator. (d) Practice runs over the prescribed driving schedule may be performed at test points, provided...
SAFARI-1: Achieving conversion to LEU - A local challenge
DOE Office of Scientific and Technical Information (OSTI.GOV)
Piani, C.S.B.
2008-07-15
Two years have passed since the South African Department of Minerals and Energy authorised the conversion from High Enriched Uranium (HEU) to Low Enriched Uranium (LEU) of the South African Research Reactor (SAFARI-1) and the associated fuel manufacturing at Pelindaba. The scheduling, as originally proposed, allowed approximately three years for the full conversion of the reactor, anticipating simultaneous manufacturing ability from the fuel production plant. Due to technical difficulties experienced in the conversion of the local manufacturing plant from HEU (UAl alloy) to LEU (U Silicide) and the uncertainty as to costing and scheduling of such an achievement, the conversionmore » of SAFARI-1 based on local supply has been allocated a lower priority. The acquisition in mid-2006 of 2 LEU silicide elements of SA design, manufactured by AREVA- CERCA and irradiated as test elements in SAFARI-1 to burn-ups of {approx}65% each; was successfully accomplished within 9 cycles of irradiation each. Furthermore, four 'Hybrid' elements (AREVA-CERCA plates assembled locally at Pelindaba) are ready for irradiation and have received regulatory authorisation to load. This will enable the SAFARI-1 conversion program to continue systematically according to an agreed schedule. This paper will trace the developments of the above and reflect the current status and the rescheduled conversion phases of the reactor according to latest expectations. (author)« less
NASA Technical Reports Server (NTRS)
Frady, Greg; Nesman, Thomas; Zoladz, Thomas; Szabo, Roland
2010-01-01
For many years, the capabilities to determine the root-cause failure of component failures have been limited to the analytical tools and the state of the art data acquisition systems. With this limited capability, many anomalies have been resolved by adding material to the design to increase robustness without the ability to determine if the design solution was satisfactory until after a series of expensive test programs were complete. The risk of failure and multiple design, test, and redesign cycles were high. During the Space Shuttle Program, many crack investigations in high energy density turbomachines, like the SSME turbopumps and high energy flows in the main propulsion system, have led to the discovery of numerous root-cause failures and anomalies due to the coexistences of acoustic forcing functions, structural natural modes, and a high energy excitation, such as an edge tone or shedding flow, leading the technical community to understand many of the primary contributors to extremely high frequency high cycle fatique fluid-structure interaction anomalies. These contributors have been identified using advanced analysis tools and verified using component and system tests during component ground tests, systems tests, and flight. The structural dynamics and fluid dynamics communities have developed a special sensitivity to the fluid-structure interaction problems and have been able to adjust and solve these problems in a time effective manner to meet budget and schedule deadlines of operational vehicle programs, such as the Space Shuttle Program over the years.
Diedrichs, Danilo R; Isihara, Paul A; Buursma, Doeke D
2014-02-01
Using a basic, two transmission level seasonal SIR model, we introduce mathematical evidence for the schedule effect which asserts that major recurring peak infections can be significantly reduced by modification of the traditional school calendar. The schedule effect is observed first in simulated time histories of the infectious population. Schedules with higher average transmission rate may exhibit reduced peak infections. Splitting vacations changes the period of the oscillating transmission function and can confine limit cycles in the proportion susceptible/proportion infected phase plane. Numerical analysis of the phase plane shows the relationship between the transmission period and the maximum recurring infection peaks and period of the response. For certain transmission periods, this response may exhibit period-doubling and chaos, leading to increased peaks. Non-monotonic infectious response is also observed in conjunction with changing birth rate. We discuss how to take these effects into consideration to design an optimum school schedule with particular reference to a hypothetical developing world context. Copyright © 2013 Elsevier Inc. All rights reserved.
Optimizing Department of Defense Acquisition Development Test and Evaluation Scheduling
2015-06-01
CPM Critical Path Method DOD Department of Defense DT&E development test and evaluation EMD engineering and manufacturing development GAMS...these, including the Program Evaluation Review Technique (PERT), the Critical Path Method ( CPM ), and the resource- constrained project-scheduling...problem (RCPSP). These are of particular interest to this thesis as the current scheduling method uses elements of the PERT/ CPM , and the test
Pre-adaptation to shiftwork in space
NASA Astrophysics Data System (ADS)
Samel, A.; Wegmann, H. M.; Vejvoda, M.
Astronauts are often required to work in shift schedules. To test pre-mission adaptation strategies and effects on the circadian system, a study was performed using microgravity simulation by head-down bedrest. Eight male subjects were studied over 4 control days, and 7 days each for pre-mission adaptation, bedrest, and readjustment. The circadian system was assessed by monitoring ECG and temperature, and by collecting urine for determination of hormones and electrolytes. Rhythms did not achieve complete adjustment within the adaptation period when the sleep-wake cycle was shortened by 1h/day, but resynchronization continued during bedrest. After the bedrest period when the time shift was reversed by a 7-h delay within 2 days, resynchronization was achieved satisfactorily only within 7 days. From the results it is concluded that a sleep-wake cycle advance as used in this study is insufficient to keep the circadian system in pace. Under operational conditions the circadian system of astronauts may become longer and more destabilized than under controlled laboratory conditions.
Study of utilization of advanced composites in fuselage structures of large transports
NASA Technical Reports Server (NTRS)
Jackson, A. C.; Campion, M. C.; Pei, G.
1984-01-01
The effort required by the transport aircraft manufacturers to support the introduction of advanced composite materials into the fuselage structure of future commercial and military transport aircraft is investigated. Technology issues, potential benefits to military life cycle costs and commercial operating costs, and development plans are examined. The most urgent technology issues defined are impact dynamics, acoustic transmission, pressure containment and damage tolerance, post-buckling, cutouts, and joints and splices. A technology demonstration program is defined and a rough cost and schedule identified. The fabrication and test of a full-scale fuselage barrel section is presented. Commercial and military benefits are identified. Fuselage structure weight savings from use of advanced composites are 16.4 percent for the commercial and 21.8 percent for the military. For the all-composite airplanes the savings are 26 percent and 29 percent, respectively. Commercial/operating costs are reduced by 5 percent for the all-composite airplane and military life cycle costs by 10 percent.
Pre-adaptation to shiftwork in space.
Samel, A; Wegmann, H M; Vejvoda, M
1993-08-01
Astronauts are often required to work in shift schedules. To test pre-mission adaptation strategies and effects on the circadian system, a study was performed using microgravity simulation by head-down bedrest. Eight male subjects were studied over 4 control days, and 7 days each for pre-mission adaptation, bedrest, and readjustment. The circadian system was assessed by monitoring ECG and temperature, and by collecting urine for determination of hormones and electrolytes. Rhythms did not achieve complete adjustment within the adaptation period when the sleep-wake cycle was shortened by 1 h/day, but resynchronization continued during bedrest. After the bedrest period when the time shift was reversed by a 7-h delay within 2 days, resynchronization was achieved satisfactorily only within 7 days. From the results it is concluded that a sleep-wake cycle advance as used in this study is insufficient to keep the circadian system in pace. Under operational conditions the circadian system of astronauts may become longer and more destabilized than under controlled laboratory conditions.
NASA Technical Reports Server (NTRS)
Sass, J. P.; Raines, N. G.; Ryan, H. M.
2004-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.
Sleep, performance, circadian rhythms, and light-dark cycles during two space shuttle flights
NASA Technical Reports Server (NTRS)
Dijk, D. J.; Neri, D. F.; Wyatt, J. K.; Ronda, J. M.; Riel, E.; Ritz-De Cecco, A.; Hughes, R. J.; Elliott, A. R.; Prisk, G. K.; West, J. B.;
2001-01-01
Sleep, circadian rhythm, and neurobehavioral performance measures were obtained in five astronauts before, during, and after 16-day or 10-day space missions. In space, scheduled rest-activity cycles were 20-35 min shorter than 24 h. Light-dark cycles were highly variable on the flight deck, and daytime illuminances in other compartments of the spacecraft were very low (5.0-79.4 lx). In space, the amplitude of the body temperature rhythm was reduced and the circadian rhythm of urinary cortisol appeared misaligned relative to the imposed non-24-h sleep-wake schedule. Neurobehavioral performance decrements were observed. Sleep duration, assessed by questionnaires and actigraphy, was only approximately 6.5 h/day. Subjective sleep quality diminished. Polysomnography revealed more wakefulness and less slow-wave sleep during the final third of sleep episodes. Administration of melatonin (0.3 mg) on alternate nights did not improve sleep. After return to earth, rapid eye movement (REM) sleep was markedly increased. Crewmembers on these flights experienced circadian rhythm disturbances, sleep loss, decrements in neurobehavioral performance, and postflight changes in REM sleep.
Manley, Ray; Satiani, Bhagwan
2009-11-01
With the widening gap between overhead expenses and reimbursement, management of the revenue cycle is a critical part of a successful vascular surgery practice. It is important to review the data on all the components of the revenue cycle: payer contracting, appointment scheduling, preregistration, registration process, coding and capturing charges, proper billing of patients and insurers, follow-up of accounts receivable, and finally using appropriate benchmarking. The industry benchmarks used should be those of peers in identical groups. Warning signs of poor performance are discussed enabling the practice to formulate a performance improvement plan.
Lin, Jing; Wang, Lu; Guidoin, Robert; Nutley, Mark; Song, Ge; Zhang, Ze; Du, Jia; Douville, Yvan
2014-03-01
Stent-grafts externally fitted with a Z-shaped stents were compared to devices fitted with ringed stents in an in vitro oscillating fatigue machine at 200 cycles per minute and a pressure of 360 mmHg for scheduled durations of up to 1 week. The devices fitted with Z-stents showed a considerably lower endurance limit to buckling compared to the controls. The contact between the apexes of adjacent Z-stents resulted in significant damage to the textile scaffolds and polyester fibers due to the sharp angle of the Z-stents. The ringed stents did not cause any fraying in the textile scaffolds.
Development of technologies for welding interconnects to fifty-micron thick silicon solar cells
NASA Technical Reports Server (NTRS)
Patterson, R. E.
1982-01-01
A program was conducted to develop technologies for welding interconnects to 50 microns thick, 2 by 2 cm solar cells. The cells were characterized with respect to electrical performance, cell thickness, silver contact thickness, contact waviness, bowing, and fracture strength. Weld schedules were independently developed for each of the three cell types and were coincidentally identical. Thermal shock tests (100 cycles from 100 C to -180 C) were performed on 16 cell coupons for each cell type without any weld joint failures or electrical degradation. Three 48 cell modules (one for each cell type) were assembled with 50 microns thick cells, frosted fused silica covers, silver clad Invar interconnectors, and Kapton substrates.
Welding interconnects to 50-micron silicon solar cells
NASA Technical Reports Server (NTRS)
Patterson, R. E.; Mesch, H. G.
1983-01-01
A program was conducted to develop technologies for welding interconnects to 50-micron thick, 2 by 2 cm solar cells obtained from three suppliers. The cells were characterized with respect to electrical performance, cell thickness, silver contact thickness, contact waviness, bowing, and fracture strength. Weld schedules were independently developed for each of the three cell types and were coincidentally identical. Thermal shock tests (100 cycles from 100 deg to -180 deg C) were performed on 16-cell coupons for each cell type without any weld joint failures or electrical degradation. Three 48-cell modules (one for each cell type) were assembled with 50-micron thick cells, frosted fused silica covers, silver clad Invar interconnectors, and Kapton substrates.
VEG-01: Veggie Hardware Verification Testing
NASA Technical Reports Server (NTRS)
Massa, Gioia; Newsham, Gary; Hummerick, Mary; Morrow, Robert; Wheeler, Raymond
2013-01-01
The Veggie plant/vegetable production system is scheduled to fly on ISS at the end of2013. Since much of the technology associated with Veggie has not been previously tested in microgravity, a hardware validation flight was initiated. This test will allow data to be collected about Veggie hardware functionality on ISS, allow crew interactions to be vetted for future improvements, validate the ability of the hardware to grow and sustain plants, and collect data that will be helpful to future Veggie investigators as they develop their payloads. Additionally, food safety data on the lettuce plants grown will be collected to help support the development of a pathway for the crew to safely consume produce grown on orbit. Significant background research has been performed on the Veggie plant growth system, with early tests focusing on the development of the rooting pillow concept, and the selection of fertilizer, rooting medium and plant species. More recent testing has been conducted to integrate the pillow concept into the Veggie hardware and to ensure that adequate water is provided throughout the growth cycle. Seed sanitation protocols have been established for flight, and hardware sanitation between experiments has been studied. Methods for shipping and storage of rooting pillows and the development of crew procedures and crew training videos for plant activities on-orbit have been established. Science verification testing was conducted and lettuce plants were successfully grown in prototype Veggie hardware, microbial samples were taken, plant were harvested, frozen, stored and later analyzed for microbial growth, nutrients, and A TP levels. An additional verification test, prior to the final payload verification testing, is desired to demonstrate similar growth in the flight hardware and also to test a second set of pillows containing zinnia seeds. Issues with root mat water supply are being resolved, with final testing and flight scheduled for later in 2013.
Landslide: Systematic Dynamic Race Detection in Kernel Space
2012-05-01
schedule_in_flight← true; CAUSE_TIMER_INTERRUPT(); end if end function Thread Scheduling Finally, the Landslide scheduler is responsible for managing ...child process vanish() simultaneously. • double_wait: Tests interactions of multiple waiters on a single child. • double_thread_fork: Tests for...conditions using Landslide. We describe them here. • Too many waiters allowed. Using the double_wait test case, Group 1 found a bug in which more threads
Preliminary power train design for a state-of-the-art electric vehicle
NASA Technical Reports Server (NTRS)
Ross, J. A.; Wooldridge, G. A.
1978-01-01
The state-of-the-art (SOTA) of electric vehicles built since 1965 was reviewed to establish a base for the preliminary design of a power train for a SOTA electric vehicle. The performance of existing electric vehicles were evaluated to establish preliminary specifications for a power train design using state-of-the-art technology and commercially available components. Power train components were evaluated and selected using a computer simulation of the SAE J227a Schedule D driving cycle. Predicted range was determined for a number of motor and controller combinations in conjunction with the mechanical elements of power trains and a battery pack of sixteen lead-acid batteries - 471.7 kg at 0.093 MJ/Kg (1040 lbs. at 11.7 Whr/lb). On the basis of maximum range and overall system efficiency using the Schedule D cycle, an induction motor and 3 phase inverter/controller was selected as the optimum combination when used with a two-speed transaxle and steel belted radial tires. The predicted Schedule D range is 90.4 km (56.2 mi). Four near term improvements to the SOTA were identified, evaluated, and predicted to increase range approximately 7%.
ERIC Educational Resources Information Center
Belke, T. W.; Mondona, A. R.; Conrad, K. M.; Poirier, K. F.; Pickering, K. L.
2008-01-01
Do rats run and respond at a higher rate to run during the dark phase when they are typically more active? To answer this question, Long Evans rats were exposed to a response-initiated variable interval 30-s schedule of wheel-running reinforcement during light and dark cycles. Wheel-running and local lever-pressing rates increased modestly during…
Heritage Systems Engineering Lessons from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for all five missions studied. The cost and schedule growth was not found to be the result of technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the systemwide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study s lessons learned in more detail and offers suggestions for improving the project s ability to identify and manage the technology and heritage risks inherent in the design solution.
Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for four of the five missions studied. The cost and schedule growth was not found to result from technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study's lessons learned in more detail and offers suggestions for improving the project's ability to identify and manage the technology and heritage risks inherent in the design solution.
NASA Technical Reports Server (NTRS)
Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet
1996-01-01
Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).
SMART operational field test evaluation : schedule adherence report : final report
DOT National Transportation Integrated Search
1997-06-01
Among the paratransit (termed Community Transit within SMART) performance indicators likely to be affected by SMARTs implementation of automated scheduling and dispatch (ASD) is schedule adherence. Schedule adherence refers to a variety of measure...
Book, Emily K; Snow, Richard; Long, Thomas; Fang, Tiegang; Baldauf, Richard
2015-06-01
Emissions tests were conducted on two medium heavy-duty diesel trucks equipped with a particulate filter (DPF), with one vehicle using a NOx absorber and the other a selective catalytic reduction (SCR) system for control of nitrogen oxides (NOx). Both vehicles were tested with two different fuels (ultra-low-sulfur diesel [ULSD] and biodiesel [B20]) and ambient temperatures (70ºF and 20ºF), while the truck with the NOx absorber was also operated at two loads (a heavy weight and a light weight). The test procedure included three driving cycles, a cold start with low transients (CSLT), the federal heavy-duty urban dynamometer driving schedule (UDDS), and a warm start with low transients (WSLT). Particulate matter (PM) emissions were measured second-by-second using an Aethalometer for black carbon (BC) concentrations and an engine exhaust particle sizer (EEPS) for particle count measurements between 5.6 and 560 nm. The DPF/NOx absorber vehicle experienced increased BC and particle number concentrations during cold starts under cold ambient conditions, with concentrations two to three times higher than under warm starts at higher ambient temperatures. The average particle count for the UDDS showed an opposite trend, with an approximately 27% decrease when ambient temperatures decreased from 70ºF to 20ºF. This vehicle experienced decreased emissions when going from ULSD to B20. The DPF/SCR vehicle tested had much lower emissions, with many of the BC and particle number measurements below detectable limits. However, both vehicles did experience elevated emissions caused by DPF regeneration. All regeneration events occurred during the UDDS cycle. Slight increases in emissions were measured during the WSLT cycles after the regeneration. However, the day after a regeneration occurred, both vehicles showed significant increases in particle number and BC for the CSLT drive cycle, with increases from 93 to 1380% for PM number emissions compared with tests following a day with no regeneration. The use of diesel particulate filters (DPFs) on trucks is becoming more common throughout the world. Understanding how DPFs affect air pollution emissions under varying operating conditions will be critical in implementing effective air quality standards. This study evaluated particulate matter (PM) and black carbon (BC) emissions with two DPF-equipped heavy-duty diesel trucks operating on conventional fuel and a biodiesel fuel blend at varying ambient temperatures, loads, and drive cycles.
Lithium-Ion Batteries Being Evaluated for Low-Earth-Orbit Applications
NASA Technical Reports Server (NTRS)
McKissock, Barbara I.
2005-01-01
The performance characteristics and long-term cycle life of aerospace lithium-ion (Li-ion) batteries in low-Earth-orbit applications are being investigated. A statistically designed test using Li-ion cells from various manufacturers began in September 2004 to study the effects of temperature, end-of-charge voltage, and depth-of-discharge operating conditions on the cycle life and performance of these cells. Performance degradation with cycling is being evaluated, and performance characteristics and failure modes are being modeled statistically. As technology improvements are incorporated into aerospace Li-ion cells, these new designs can be added to the test to evaluate the effect of the design changes on performance and life. Cells from Lithion and Saft have achieved over 2000 cycles under 10 different test condition combinations and are being evaluated. Cells from Mine Safety Appliances (MSA) and modules made up of commercial-off-the-shelf 18650 Li-ion cells connected in series/parallel combinations are scheduled to be added in the summer of 2005. The test conditions include temperatures of 10, 20, and 30 C, end-of-charge voltages of 3.85, 3.95, and 4.05 V, and depth-of-discharges from 20 to 40 percent. The low-Earth-orbit regime consists of a 55 min charge, at a constant-current rate that is 110 percent of the current required to fully recharge the cells in 55 min until the charge voltage limit is reached, and then at a constant voltage for the remaining charge time. Cells are discharged for 35 min at the current required for their particular depth-of-discharge condition. Cells are being evaluated in four-cell series strings with charge voltage limits being applied to individual cells by the use of charge-control units designed and produced at the NASA Glenn Research Center. These charge-control units clamp the individual cell voltages as each cell reaches its end-of-charge voltage limit, and they bypass the excess current from that cell, while allowing the full current flow to the remaining cells in the pack. The goal of this evaluation is to identify conditions and cell designs for Li-ion technology that can achieve more than 30,000 low-Earth-orbit cycles. Testing is being performed at the Naval Surface Warfare Center, Crane Division, in Crane, Indiana.
Tse, Vicki C; Ng, Wai Tong; Lee, Victor; Lee, Anne W M; Chua, Daniel T T; Chau, June; McGhee, Sarah M
2011-07-09
XELOX (capecitabine + oxaliplatin) and FOLFOX 4 (5-FU + folinic acid + oxaliplatin) have shown similar improvements in survival in patients with metastatic colorectal cancer (MCRC). A US cost-minimization study found that the two regimens had similar costs from a healthcare provider perspective but XELOX had lower costs than FOLFOX4 from a societal perspective, while a Japanese cost-effectiveness study found XELOX had superior cost-effectiveness. This study compared the costs of XELOX and FOLFOX4 in patients with MCRC recently treated in two oncology departments in Hong Kong. Cost data were collected from the medical records of 60 consecutive patients (30 received XELOX and 30 FOLFOX4) from two hospitals. Drug costs, outpatient visits, hospital days and investigations were recorded and expressed as cost per patient from the healthcare provider perspective. Estimated travel and time costs were included in a societal perspective analysis. All costs were classed as either scheduled (associated with planned chemotherapy and follow-up) or unscheduled (unplanned visits or admissions and associated tests and medicines). Costs were based on government and hospital sources and expressed in US dollars (US$). XELOX patients received an average of 7.3 chemotherapy cycles (of the 8 planned cycles) and FOLFOX4 patients received 9.2 cycles (of the 12 planned cycles). The scheduled cost per patient per cycle was $2,046 for XELOX and $2,152 for FOLFOX4, while the unscheduled cost was $240 and $421, respectively. Total treatment cost per patient was $16,609 for XELOX and $23,672 for FOLFOX4; the total cost for FOLFOX4 was 37% greater than that of XELOX. The addition of the societal costs increased the total treatment cost per patient to $17,836 for XELOX and $27,455 for FOLFOX4. Sensitivity analyses showed XELOX was still less costly than FOLFOX4 when using full drug regimen costs, incorporating data from a US model with costs and adverse event data from their clinical trial and with the removal of oxaliplatin from both treatment arms. Capecitabine would have to cost around four times its present price in Hong Kong for the total resource cost of treatment with XELOX to equal that of FOLFOX4. XELOX costs less than FOLFOX4 for this patient group with MCRC from both the healthcare provider and societal perspectives.
2011-01-01
Background XELOX (capecitabine + oxaliplatin) and FOLFOX 4 (5-FU + folinic acid + oxaliplatin) have shown similar improvements in survival in patients with metastatic colorectal cancer (MCRC). A US cost-minimization study found that the two regimens had similar costs from a healthcare provider perspective but XELOX had lower costs than FOLFOX4 from a societal perspective, while a Japanese cost-effectiveness study found XELOX had superior cost-effectiveness. This study compared the costs of XELOX and FOLFOX4 in patients with MCRC recently treated in two oncology departments in Hong Kong. Methods Cost data were collected from the medical records of 60 consecutive patients (30 received XELOX and 30 FOLFOX4) from two hospitals. Drug costs, outpatient visits, hospital days and investigations were recorded and expressed as cost per patient from the healthcare provider perspective. Estimated travel and time costs were included in a societal perspective analysis. All costs were classed as either scheduled (associated with planned chemotherapy and follow-up) or unscheduled (unplanned visits or admissions and associated tests and medicines). Costs were based on government and hospital sources and expressed in US dollars (US$). Results XELOX patients received an average of 7.3 chemotherapy cycles (of the 8 planned cycles) and FOLFOX4 patients received 9.2 cycles (of the 12 planned cycles). The scheduled cost per patient per cycle was $2,046 for XELOX and $2,152 for FOLFOX4, while the unscheduled cost was $240 and $421, respectively. Total treatment cost per patient was $16,609 for XELOX and $23,672 for FOLFOX4; the total cost for FOLFOX4 was 37% greater than that of XELOX. The addition of the societal costs increased the total treatment cost per patient to $17,836 for XELOX and $27,455 for FOLFOX4. Sensitivity analyses showed XELOX was still less costly than FOLFOX4 when using full drug regimen costs, incorporating data from a US model with costs and adverse event data from their clinical trial and with the removal of oxaliplatin from both treatment arms. Capecitabine would have to cost around four times its present price in Hong Kong for the total resource cost of treatment with XELOX to equal that of FOLFOX4. Conclusion XELOX costs less than FOLFOX4 for this patient group with MCRC from both the healthcare provider and societal perspectives. PMID:21740590
The Associate Principal Astronomer for AI Management of Automatic Telescopes
NASA Technical Reports Server (NTRS)
Henry, Gregory W.
1998-01-01
This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.
Kado, Norman Y; Okamoto, Robert A; Kuzmicky, Paul A; Kobayashi, Reiko; Ayala, Alberto; Gebel, Michael E; Rieger, Paul L; Maddox, Christine; Zafonte, Leo
2005-10-01
The number of heavy-duty vehicles using alternative fuels such as compressed natural gas (CNG) and new low-sulfur diesel fuel formulations and equipped with after-treatment devices are projected to increase. However, few peer-reviewed studies have characterized the emissions of particulate matter (PM) and other toxic compounds from these vehicles. In this study, chemical and biological analyses were used to characterize the identifiable toxic air pollutants emitted from both CNG and low-sulfur-diesel-fueled heavy-duty transit buses tested on a chassis dynamometer over three transient driving cycles and a steady-state cruise condition. The CNG bus had no after-treatment, and the diesel bus was tested first equipped with an oxidation catalyst (OC) and then with a catalyzed diesel particulate filter (DPF). Emissions were analyzed for PM, volatile organic compounds (VOCs; determined on-site), polycyclic aromatic hydrocarbons (PAHs), and mutagenic activity. The 2000 model year CNG-fueled vehicle had the highest emissions of 1,3-butadiene, benzene, and carbonyls (e.g., formaldehyde) of the three vehicle configurations tested in this study. The 1998 model year diesel bus equipped with an OC and fueled with low-sulfur diesel had the highest emission rates of PM and PAHs. The highest specific mutagenic activities (revertants/microg PM, or potency) and the highest mutagen emission rates (revertants/mi) were from the CNG bus in strain TA98 tested over the New York Bus (NYB) driving cycle. The 1998 model year diesel bus with DPF had the lowest VOCs, PAH, and mutagenic activity emission. In general, the NYB driving cycle had the highest emission rates (g/mi), and the Urban Dynamometer Driving Schedule (UDDS) had the lowest emission rates for all toxics tested over the three transient test cycles investigated. Also, transient emissions were, in general, higher than steady-state emissions. The emissions of toxic compounds from an in-use CNG transit bus (without an oxidation catalyst) and from a vehicle fueled with low-sulfur diesel fuel (equipped with DPF) were lower than from the low-sulfur diesel fueled vehicle equipped with OC. All vehicle configurations had generally lower emissions of toxics than an uncontrolled diesel engine. Tunnel backgrounds (measurements without the vehicle running) were measured throughout this study and were helpful in determining the incremental increase in pollutant emissions. Also, the on-site determination of VOCs, especially 1,3-butadiene, helped minimize measurement losses due to sample degradation after collection.
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
40 CFR 790.55 - Modification of test standards or schedules during conduct of test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Modification of test standards or schedules during conduct of test. 790.55 Section 790.55 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) PROCEDURES GOVERNING TESTING CONSENT AGREEMENTS AND TEST RULES Implementation,...
Wu, Junjie; Waxman, David J.
2014-01-01
Metronomic cyclophosphamide (CPA) treatment activates robust innate anti-tumor immunity and induces major regression of large, implanted brain tumor xenografts when administered on an intermittent, every 6-day schedule, but not on a daily low-dose or a maximum-tolerated dose CPA schedule. Here, we used an implanted GL261 glioma model to compare five intermittent metronomic CPA schedules to elucidate the kinetics and schedule dependence of innate immune cell recruitment and tumor regression. Tumor-recruited natural killer cells induced by two every 6-day treatment cycles were significantly ablated one day after a third CPA treatment, but largely recovered several days later. Natural killer and other tumor-infiltrating innate immune cells peaked 12 days after the last CPA treatment on the every 6-day schedule, suggesting that drug-free intervals longer than 6 days may show increased efficacy. Metronomic CPA treatments spaced 9 or 12 days apart, or on an alternating 6 and 9 day schedule, induced extensive tumor regression, similar to the 6-day schedule, however, the tumor-infiltrating natural killer cell responses were not sustained, leading to rapid resumption of tumor regrowth after day 24, despite ongoing metronomic CPA treatment. Increasing the CPA dose prolonged the period of tumor regression on the every 9-day schedule, but natural killer cell activation was markedly decreased. Thus, while several intermittent metronomic CPA treatment schedules can activate innate immune cell recruitment leading to major tumor regression, sustained immune and anti-tumor responses are only achieved on the 6-day schedule. However, even with this schedule, some tumors eventually relapse, indicating a need for further improvements in immunogenic metronomic therapies. PMID:25069038
Cadwallader, Amy B
2017-09-01
Traditionally, urine drug testing (UDT) in the correctional population (both prison and community corrections) has been infrequent, is scheduled, and has a high possibility of delayed results. Of practical relevance is that scheduled testing is ineffective for identifying drug misuse. Of ethical relevance is that consequences of positive scheduled tests can be unpredictable-in the form of overly severe punishment or a lack of treatment options-and that the scheduled testing paradigm is a poor way to change behaviors. More innovative programs now use a UDT paradigm with more frequent, random testing providing rapid results and certain, swift consequences and addiction treatment when warranted or requested. Studies have shown these new programs-the foundation of which is frequent, random UDTs-to significantly reduce drug use, criminal recidivism, and incarceration. © 2017 American Medical Association. All Rights Reserved.
Thinking Outside the Block: An Innovative Alternative to 4X4 Block Scheduling.
ERIC Educational Resources Information Center
Frank, Myra
2002-01-01
Introduces a 4x1 block scheduling method that was developed as an alternative to 4x4 block scheduling. Schedules Fridays for summer school, test preparation, and enrichment and elective courses. Includes suggestions on how to alleviate drawbacks of the 4x1 block schedule. (YDS)
Influence of menstrual cycle phase on pulmonary function in asthmatic athletes.
Stanford, Kristin I; Mickleborough, Timothy D; Ray, Shahla; Lindley, Martin R; Koceja, David M; Stager, Joel M
2006-04-01
The main aim of this study was to investigate whether there is a relationship between menstrual cycle phase and exercise-induced bronchoconstriction (EIB) in female athletes with mild atopic asthma. Seven eumenorrheic subjects with regular 28-day menstrual cycles were exercised to volitional exhaustion on day 5 [mid-follicular (FOL)] and day 21 [mid-luteal (LUT)] of their menstrual cycle. Pulmonary function tests were conducted pre- and post-exercise. The maximal percentage decline in post-exercise forced expiratory volume in 1 s (FEV(1)) and forced expiratory flow from 25 to 75% of forced vital capacity (FEF(25-75%)) was significantly greater (P<0.05) on day 21 (mid-LUT phase) (-17.35+/-2.32 and -26.28+/-6.04%, respectively), when salivary progesterone concentration was highest, compared to day 5 (mid-FOL phase) (-12.81+/-3.35 and -17.23+/-8.20%, respectively), when salivary progesterone concentration was lowest. The deterioration in the severity of EIB during the mid-LUT phase was accompanied by worsening asthma symptoms and increased bronchodilator use. There was a negative correlation between the percent change in pre- to post-exercise FEV(1) and salivary progesterone concentration. However, no such correlation was found between salivary estradiol and the percentage change in pre- to post-exercise FEV(1). This study has shown for the first time that menstrual cycle phase is an important determinant of the severity of EIB in female athletes with mild atopic asthma. Female asthmatic athletes may need to adjust their training and competition schedules to their menstrual cycle and to consider the potential negative effects of the LUT phase of the menstrual cycle on exercise performance.
NASA Technical Reports Server (NTRS)
1991-01-01
Recommendations are made after 32 interviews, lesson identification, lesson analysis, and mission characteristics identification. The major recommendations are as follows: (1) to develop end-to-end planning and scheduling operations concepts by mission class and to ensure their consideration in system life cycle documentation; (2) to create an organizational infrastructure at the Code 500 level, supported by a Directorate level steering committee with project representation, responsible for systems engineering of end-to-end planning and scheduling systems; (3) to develop and refine mission capabilities to assess impacts of early mission design decisions on planning and scheduling; and (4) to emphasize operational flexibility in the development of the Advanced Space Network, other institutional resources, external (e.g., project) capabilities and resources, operational software and support tools.
Sandra-Petrescu, Flavius; Herrle, Florian; Burkholder, Iris; Kienle, Peter; Hofheinz, Ralf-Dieter
2018-04-03
A randomized trial demonstrated that capecitabine is at least as effective as fluorouracil in the adjuvant treatment of patients with locally advanced rectal cancer. However, not all patients receive all planned cycles of chemotherapy. Therefore it is of interest how complete or partial administration of chemotherapy influences oncological outcome. A post hoc analysis of a trial with 401 randomized patients, nine being excluded because of missing data, was performed. 392 patients (197 - capecitabine, 195 - fluorouracil) could be analyzed regarding the number of administered adjuvant chemotherapy cycles. In the subgroup of 361 patients with an overall survival of at least six months, five-year overall and disease-free survival were analyzed in respect to completion (complete vs. incomplete) of chemotherapy cycles. Survival rates and curves were calculated and compared using the log-rank test. The effect of completion of chemotherapy was adjusted for relevant confounding factors. Two hundred fifty-one (64.0%) of analyzed patients received all postoperative scheduled cycles. Five-year overall survival was significantly better in these patients compared to the incomplete group (76.0 vs. 60.6%, p < 0.0001). Of 361 patients with an overall survival of at least six months, 251(69.5%) patients received all cycles. Five-year overall survival was also significantly better than in the incomplete group (76.0 vs. 66.4%, p = 0.0073). Five-year disease free survival was numerically better (64.9 vs. 58.7%, p = 0.0646; HR [not all cycles vs. all cycles] = 1.42 95% CI: [0.98, 2.07]). Cox regression models show a non-significant better OS (p = 0.061) and DFS (p = 0.083), if chemotherapy cycles were administered completely. Complete administration of chemotherapy cycles was associated with improved five-year overall and disease-free survival in patients with locally advanced rectal cancer.
Khushalani, Nikhil I; Leichman, Cynthia Gail; Proulx, Gary; Nava, Hector; Bodnar, Lisa; Klippenstein, Donald; Litwin, Alan; Smith, Judy; Nava, Enriqueta; Pendyala, Lakshmi; Smith, Patrick; Greco, William; Berdzik, Joanne; Douglass, Harold; Leichman, Lawrence
2002-06-15
To identify a dose and schedule of oxaliplatin (OXP) to be safely administered in combination with protracted-infusion (PI) fluorouracil (5-FU) and external-beam radiation therapy (XRT) for patients with primary esophageal carcinoma (EC). Eligibility included therapeutically naïve EC patients with clinical disease stages II, III, or IV. Initial doses and schedules for cycle 1 consisted of OXP 85 mg/m(2) on days 1, 15, and 29; PI 5-FU 180 mg/m(2) for 24 hours for 35 days; and XRT 1.8 Gy in 28 fractions starting on day 8. At completion of cycle 1, eligible patients could undergo an operation or begin cycle 2 without XRT. Postoperative patients were eligible for cycle 2. Stage IV patients were allowed three cycles in the absence of disease progression. OXP and 5-FU increases were based on dose-limiting toxicity (DLT) encountered in cohorts of three consecutive patients. Thirty-eight eligible patients received therapy: 22 noninvasively staged as IV and 16 noninvasively staged as II and III. Thirty-six patients completed cycle 1, 29 patients started cycle 2, and 24 patients completed cycle 2. The combined-modality therapy was well tolerated, but DLT prevented OXP and 5-FU escalation. No grade 4 hematologic toxicity was noted. Eleven grade 3 and two grade 4 clinical toxicities were noted in eight patients. After cycle 1, 29 patients (81%) had no cancer in the esophageal mucosa. Thirteen patients underwent an operation with intent to resect the esophagus; five patients (38%) exhibited pathologic complete responses. OXP 85 mg/m(2) on days 1, 15, and 29 administered with PI 5-FU and XRT is safe, tolerable, and seems effective against primary EC. The role of OXP in multimodality regimens against EC deserves further evaluation.
ERIC Educational Resources Information Center
Murray, Gregory V.; Moyer-Packenham, Patricia S.
2014-01-01
One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…
Results of Rolling Resistance Measurements of Twelve Radial Passenger Car Tires
DOT National Transportation Integrated Search
1980-01-01
The Calspan Tire Research Facility is described, including the test procedure, a tire test schedule, and a tire identification schedule for testing low-rolling resistance radial passenger car tires. The equilibrium rolling resistance was measured on ...
Kwon, Yong Hyun; Kwon, Jung Won; Lee, Myoung Hee
2015-01-01
[Purpose] The purpose of the current study was to compare the effectiveness of motor sequential learning according to two different types of practice schedules, distributed practice schedule (two 12-hour inter-trial intervals) and massed practice schedule (two 10-minute inter-trial intervals) using a serial reaction time (SRT) task. [Subjects and Methods] Thirty healthy subjects were recruited and then randomly and evenly assigned to either the distributed practice group or the massed practice group. All subjects performed three consecutive sessions of the SRT task following one of the two different types of practice schedules. Distributed practice was scheduled for two 12-hour inter-session intervals including sleeping time, whereas massed practice was administered for two 10-minute inter-session intervals. Response time (RT) and response accuracy (RA) were measured in at pre-test, mid-test, and post-test. [Results] For RT, univariate analysis demonstrated significant main effects in the within-group comparison of the three tests as well as the interaction effect of two groups × three tests, whereas the between-group comparison showed no significant effect. The results for RA showed no significant differences in neither the between-group comparison nor the interaction effect of two groups × three tests, whereas the within-group comparison of the three tests showed a significant main effect. [Conclusion] Distributed practice led to enhancement of motor skill acquisition at the first inter-session interval as well as at the second inter-interval the following day, compared to massed practice. Consequentially, the results of this study suggest that a distributed practice schedule can enhance the effectiveness of motor sequential learning in 1-day learning as well as for two days learning formats compared to massed practice. PMID:25931727
Nelson, Anita; Parke, Susanne; Mellinger, Uwe; Zampaglione, Edio; Schmidt, Anja
2014-03-01
This study investigated the efficacy and safety of a combined oral contraceptive (COC) containing estradiol valerate/dienogest (E2V/DNG). This was a multicenter, noncomparative, 13-cycle (extended to 28 cycles) study conducted in the United States and Canada. Contraceptive efficacy was calculated as a Pearl Index for 13 cycles, based on all on-treatment pregnancies; bleeding patterns were calculated based on bleeding and spotting information recorded daily in diary cards. Safety events during a 16-month extension study were added to the 1-year data. In total, 499 women, aged 18-35 years, were enrolled, and 490 of them were included in the full analysis set for contraceptive efficacy. Five pregnancies occurred in the first year (unadjusted Pearl Index=1.64). In cycles 1-12, an average 23.5% of women had absent scheduled (withdrawal) bleeding. Among women with scheduled (withdrawal) bleeding, bleeding started after a median of 2 days after intake of the last DNG-containing pill. For safety, data included from 147 women followed over an additional 16 months were added to the original 13-cycle data set. Treatment-related adverse events (AEs) occurred in 51.8% of women; 14.9% discontinued because of AEs over the entire 28-month study period. A COC with E2V and DNG was shown to provide effective contraception in women aged 18-35 years in North America.
ODECS -- A computer code for the optimal design of S.I. engine control strategies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arsie, I.; Pianese, C.; Rizzo, G.
1996-09-01
The computer code ODECS (Optimal Design of Engine Control Strategies) for the design of Spark Ignition engine control strategies is presented. This code has been developed starting from the author`s activity in this field, availing of some original contributions about engine stochastic optimization and dynamical models. This code has a modular structure and is composed of a user interface for the definition, the execution and the analysis of different computations performed with 4 independent modules. These modules allow the following calculations: (1) definition of the engine mathematical model from steady-state experimental data; (2) engine cycle test trajectory corresponding to amore » vehicle transient simulation test such as ECE15 or FTP drive test schedule; (3) evaluation of the optimal engine control maps with a steady-state approach; (4) engine dynamic cycle simulation and optimization of static control maps and/or dynamic compensation strategies, taking into account dynamical effects due to the unsteady fluxes of air and fuel and the influences of combustion chamber wall thermal inertia on fuel consumption and emissions. Moreover, in the last two modules it is possible to account for errors generated by a non-deterministic behavior of sensors and actuators and the related influences on global engine performances, and compute robust strategies, less sensitive to stochastic effects. In the paper the four models are described together with significant results corresponding to the simulation and the calculation of optimal control strategies for dynamic transient tests.« less
Life-Cycle-Cost Analysis of the Microwave Landing System Ground and Airborne Systems
1981-10-01
constant 1980 dollars, with a production rate variability. Table S-3 presents the life-cycle costs by MLS configuration and total system implementation... PRODUCTION RATE VARIABILITY OVER A THREE-YEAR PFODUCTXION RUN (MILLIONS OF CONSTANT 1980 DOLLARS) Pruduction (Juantitl•e and Costs system Typ 75...Implementation strategies * Production schedules for MLS equipment The LCC was determined to be relatively insensitive to changes in MTBF. This was expected
NASA Technical Reports Server (NTRS)
Johnson, Kenneth R.
1997-01-01
The Mars Pathfinder (MPF) Spacecraft was built and tested at the Jet Propulsion Laboratory during 1995/96. MPF is scheduled to launch in December 1996 and to land on Mars on July 4, 1997. The testing program for MPF required subjecting the mission hardware to both deep space and Mars surface conditions. A series of tests were devised and conducted from 1/95 to 7/96 to study the thermal response of the MPF spacecraft to the environmental conditions in which it will be exposed during the cruise phase (on the way to Mars) and the lander phase (landed on Mars) of the mission. Also, several tests were conducted to study the thermal characteristics of the Mars rover, Sojourner, under Mars surface environmental conditions. For these tests, several special test fixtures and methods were devised to simulate the required environmental conditions. Creating simulated Mars surface conditions was a challenging undertaking since Mars' surface is subjected to diurnal cycling between -20 C and -85 C, with windspeeds to 20 m/sec, occurring in an 8 torr CO2 atmosphere. This paper describes the MPF test program which was conducted at JPL to verify the MPF thermal design.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... switch port in the test environment. The test environment is designed to closely mirror the live equity... Change To Establish Fees Under the PHLX Pricing Schedule for Use of the Carteret Testing Facility Test... establish fees under the Pricing Schedule for use of the Testing Facility (``NTF'') test environment located...
NASA Astrophysics Data System (ADS)
Bonner, Tonia Anita
This study examined the difference between the number of overall students, African-American students, and students with disabilities on a semester 4 x 4 block schedule who were proficient on the North Carolina Biology End-of-Course Test and the number of the same group of students on a traditional 45-50 minute yearlong schedule who were proficient on the NC Biology End-of-Course Test in the state of North Carolina during the 2009--2010 school year. A causal-comparative design was used and three null hypotheses were tested using chi-square analysis. Archival data was used. The results showed that there was a significant association between the number of the overall students and African-American students who were proficient on the NC Biology EOC Test when taught biology on a 4 x 4 semester block versus a traditional schedule. However, no statistically significant relationship existed between the number of students with disabilities who were educated on 4 x 4 semester block schedule and those students with disabilities who were educated on a six or seven period traditional schedule in biology. Suggestions for further research are included.
NASA Astrophysics Data System (ADS)
Leonardi, Marcelo
The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.
Sleep, Circadian Rhythms, and Performance During Space Shuttle Missions
NASA Technical Reports Server (NTRS)
Neri, David F.; Czeisler, Charles A.; Dijk, Derk-Jan; Wyatt, James K.; Ronda, Joseph M.; Hughes, Rod J.
2003-01-01
Sleep and circadian rhythms may be disturbed during spaceflight, and these disturbances can affect crewmembers' performance during waking hours. The mechanisms underlying sleep and circadian rhythm disturbances in space are not well understood, and effective countermeasures are not yet available. We investigated sleep, circadian rhythms, cognitive performance, and light-dark cycles in five astronauts prior to, during, and after the 16-day STS-90 mission and the IO-day STS-95 mission. The efficacy of low-dose, alternative-night, oral melatonin administration as a countermeasure for sleep disturbances was evaluated. During these missions, scheduled rest activity cycles were 20-35 minutes shorter than 24 hours. Light levels on the middeck and in the Spacelab were very low; whereas on the flight deck (which has several windows), they were highly variable. Circadian rhythm abnormalities were observed. During the second half of the missions, the rhythm of urinary cortisol appeared to be delayed relative to the sleep-wake schedule. Performance during wakefulness was impaired. Astronauts slept only about 6.5 hours per day, and subjective sleep quality was lower in space. No beneficial effects of melatonin (0.3 mg administered prior to sleep episodes on alternate nights) were observed. A surprising finding was a marked increase in rapid eye movement (REM) sleep upon return to Earth. We conclude that these Space Shuttle missions were associated with circadian rhythm disturbances, sleep loss, decrements in neurobehavioral performance, and alterations in REM sleep homeostasis. Shorter than 24-hour rest-activity schedules and exposure to light-dark cycles inadequate for optimal circadian synchronization may have contributed to these disturbances.
NASA Technical Reports Server (NTRS)
Ewashinka, J. G.; Bozek, J. M.
1981-01-01
A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule.
NASA Astrophysics Data System (ADS)
Ewashinka, J. G.; Bozek, J. M.
1981-05-01
A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule.
Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P
2016-09-13
In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid residency programs in schedule analysis and redesign.
... clock is out of sync with the normal day-night cycle and causes a disrupted sleep schedule.) Tasimelteon ... It is usually taken without food once a day before bedtime. Take tasimelteon at the same time every night. If you are unable to take tasimelteon at ...
Full-Authority Fault-Tolerant Electronic Engine Control Systems for Variable Cycle Engines.
1981-12-01
Geometry or Fuel Flow Scheduled as a Function of Engine State, i.e. FIGV = f( N1 C2 ) Closed Loop - Geometry or Fuel Flow Modulated To Maintain an Engine...Low Pressure Turbine Inlet Area (A41) Closed Loop (Integral) N2, T22 Core Stream Exhaust Nozzle Area (AJE) Closed Loop (Integral) N1 , T2 Duct Stream...to remain at the breakpoint value while low rotor speed reference ( N1 reference) is scheduled to decrease as a function of power lever angle (PLA), to
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2012 CFR
2012-04-01
... competent processing authorities. If incubation tests are necessary for process confirmation, they shall... instituting the process. The incubation tests for confirmation of the scheduled processes should include the.... Complete records covering all aspects of the establishment of the process and associated incubation tests...
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... procedures recognized by competent processing authorities. If incubation tests are necessary for process... the period of instituting the process. The incubation tests for confirmation of the scheduled... and associated incubation tests shall be prepared and shall be permanently retained by the person or...
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2014 CFR
2014-04-01
... competent processing authorities. If incubation tests are necessary for process confirmation, they shall... instituting the process. The incubation tests for confirmation of the scheduled processes should include the.... Complete records covering all aspects of the establishment of the process and associated incubation tests...
21 CFR 113.83 - Establishing scheduled processes.
Code of Federal Regulations, 2013 CFR
2013-04-01
... competent processing authorities. If incubation tests are necessary for process confirmation, they shall... instituting the process. The incubation tests for confirmation of the scheduled processes should include the.... Complete records covering all aspects of the establishment of the process and associated incubation tests...
Proposed Schedule for Fenton Hill Experiments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albright, James N.; Brown, Donald W.
To help in planning Fenton Hill experimental operations in concert with preparations for the Long-Term Flow Test (LTFT) next summer, the following schedule is proposed. This schedule fits some of the realities of the next few months, including the Laboratory closure during the Holidays, the seismic monitoring tests in Roswell, and the difficulties of operating during the winter months. Whenever possible, cyclic pumping operations during the colder months will be scheduled so that the pump will be on during the late evening and early morning hours to prevent freezeup.
Comparison of menstrual disorders in hospital nursing staff according to shift work pattern.
Albert-Sabater, Josep Amílcar; Martínez, José Miguel; Baste, Valborg; Moen, Bente E; Ronda-Perez, Elena
2016-11-01
To assess the association between work in a rotating shift schedule and menstruation characteristics among nurse staff in a prospective study. Rotating shifts have been linked to alterations in the reproductive cycle. In the case of menstrual alterations, the conclusions are not clear. Prospective epidemiological study with follow-up over four months. All the female nurse staff (<40 years) in a hospital were interviewed, collecting sociodemographic and employment information. They were given a menstrual diary to keep a record of their shifts and characteristics of their menstruation (duration, amount of blood, dysmenorrhoea). They had two types of shifts: (1) Rotating shift schedule (two mornings, two afternoons, one night and two days off) including morning shifts (8:00-15:00), afternoon/evening shifts (15:00-22:00) and night shifts (22:00-8:00), and (2) Day shift schedule including morning shifts (8:00-15:00) and/or afternoon/evening shifts (15:00-22:00). The crude and adjusted odds ratios with 95% confidence interval were calculated using logistic generalised estimating equations (GEE) taking into account the correlations of multiple cycles per worker. One hundred and thirteen workers on the rotating shift and 75 on the day shift participated, and information from 730 menstrual cycles were obtained. There were no differences in prolonged duration, dysmenorrhoea, prolonged duration dysmenorrhoea and excessive bleeding among nurses on rotating shift compared to those on the day shift. For prolonged duration of menstruation, workers with more than five years on the rotating shift showed a slightly lower (nonsignificant) risk compared with those with <5 years. Nurse staff on the rotating shift did not show increased risk of having menstrual disorders comparing with day staff. Shifts with short rotation cycles and a progressive sequence do not appear to cause menstrual disorders in nurse staff who work rotating shifts. © 2016 John Wiley & Sons Ltd.
Carroll, Marilyn E.; Kohl, Emily A.; Johnson, Krista M.; LaNasa, Rachel M.
2013-01-01
Background In previous studies with male and female rhesus monkeys withdrawal of access to oral phencyclidine (PCP) self administration reduced responding for food under a high fixed-ratio (FR) schedule more in males than females and with a delay discounting (DD) task with saccharin (SACC) as the reinforcer. Impulsive choice for SACC increased during PCP withdrawal more than females. Objectives The goal of the present study was to examine the effect of PCP (0.25 or 0.5 mg/ml) withdrawal on impulsive choice for SACC in females during the follicular and luteal phases of the menstrual cycle. Materials and methods In Component 1 PCP and water were available from 2 drinking spouts for 1.5 h sessions under concurrent FR 16 schedules. In Component 2 a SACC solution was available for 45 min under a DD schedule. Monkeys had a choice of one immediate SACC delivery (0.6 ml) or 6 delayed SACC deliveries, and the delay was increased by 1 sec after a response on the delayed lever and decreased by 1 sec after a response on the immediate lever. There was then a 10-day water substitution phase, or PCP-withdrawal, that occurred during the mid-folllicular phase (Days 7–11) or the late-luteal (Days 24–28) phase of the menstrual cycle. Access to PCP and concurrent water was then restored, and the PCP withdrawal procedure was repeated over several follicular and luteal menstrual phases. Results PCP deliveries were higher during the luteal vs the follicular phase. Impulsive choice was greater during the luteal (vs follicular) phase during withdrawal of the higher PCP concentration. Conclusions PCP withdrawal was associated with elevated impulsive choice for SACC, especially in the luteal (vs follicular) phase of the menstrual cycle in female monkeys. PMID:23344553
NASA Technical Reports Server (NTRS)
Mckay, C. W.; Bown, R. L.
1985-01-01
The space station data management system involves networks of computing resources that must work cooperatively and reliably over an indefinite life span. This program requires a long schedule of modular growth and an even longer period of maintenance and operation. The development and operation of space station computing resources will involve a spectrum of systems and software life cycle activities distributed across a variety of hosts, an integration, verification, and validation host with test bed, and distributed targets. The requirement for the early establishment and use of an apporopriate Computer Systems and Software Engineering Support Environment is identified. This environment will support the Research and Development Productivity challenges presented by the space station computing system.
Pitch Guidance Optimization for the Orion Abort Flight Tests
NASA Technical Reports Server (NTRS)
Stillwater, Ryan Allanque
2010-01-01
The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.
Investigation of bus transit schedule behavior modeling using advanced techniques
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalaputapu, R.; Demetsky, M.J.
This research focused on investigating the application of artificial neural networks (ANN) and the Box-Jenkins technique for developing and testing schedule behavior models using data obtained for a test route from Tidewater Regional Transit`s AVL system. The three ANN architectures investigated were: Feedforward Network, Elman Network and Jordan Network. In addition, five different model structures were investigated. The time-series methodology was adopted for developing the schedule behavior models. Finally, the role of a schedule behavior model within the framework of an intelligent transit management system is defined and the potential utility of the schedule behavior model is discussed using anmore » example application.« less
Time cycle analysis and simulation of material flow in MOX process layout
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chakraborty, S.; Saraswat, A.; Danny, K.M.
The (U,Pu)O{sub 2} MOX fuel is the driver fuel for the upcoming PFBR (Prototype Fast Breeder Reactor). The fuel has around 30% PuO{sub 2}. The presence of high percentages of reprocessed PuO{sub 2} necessitates the design of optimized fuel fabrication process line which will address both production need as well as meet regulatory norms regarding radiological safety criteria. The powder pellet route has highly unbalanced time cycle. This difficulty can be overcome by optimizing process layout in terms of equipment redundancy and scheduling of input powder batches. Different schemes are tested before implementing in the process line with the helpmore » of a software. This software simulates the material movement through the optimized process layout. The different material processing schemes have been devised and validity of the schemes are tested with the software. Schemes in which production batches are meeting at any glove box location are considered invalid. A valid scheme ensures adequate spacing between the production batches and at the same time it meets the production target. This software can be further improved by accurately calculating material movement time through glove box train. One important factor is considering material handling time with automation systems in place.« less
Scheduling Chemotherapy: Catch 22 between Cell Kill and Resistance Evolution
Gardner, Shea N.
2000-01-01
Dose response curves show that prolonged drug exposure at a low concentration may kill more cells than short exposures at higher drug concentrations, particularly for cell cycle phase specific drugs. Applying drugs at low concentrations for prolonged periods, however, allows cells with partial resistance to evolve higher levels of resistance through stepwise processes such as gene amplification. Models are developed for cell cycle specific (CS) and cell cycle nonspecific (CNS) drugs to identify the schedule of drug application that balances this tradeoff. The models predict that a CS drug may be applied most effectively by splitting the cumulative dose intomore » many (>40) fractions applied by long-term chemotherapy, while CNS drugs may be better applied in fewer than 10 fractions applied over a shorter term. The model suggests that administering each fraction by continuous infusion may be more effective than giving the drug as a bolus, whether the drug is CS or CNS. In addition, tumors with a low growth fraction or slow rate of cell division are predicted to be controlled more easily with CNS drugs, while those with a high proliferative fraction or fast cell division rate may respond better to CS drugs.« less
Scheduling Chemotherapy: Catch 22 between Cell Kill and Resistance Evolution
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gardner, Shea N.
Dose response curves show that prolonged drug exposure at a low concentration may kill more cells than short exposures at higher drug concentrations, particularly for cell cycle phase specific drugs. Applying drugs at low concentrations for prolonged periods, however, allows cells with partial resistance to evolve higher levels of resistance through stepwise processes such as gene amplification. Models are developed for cell cycle specific (CS) and cell cycle nonspecific (CNS) drugs to identify the schedule of drug application that balances this tradeoff. The models predict that a CS drug may be applied most effectively by splitting the cumulative dose intomore » many (>40) fractions applied by long-term chemotherapy, while CNS drugs may be better applied in fewer than 10 fractions applied over a shorter term. The model suggests that administering each fraction by continuous infusion may be more effective than giving the drug as a bolus, whether the drug is CS or CNS. In addition, tumors with a low growth fraction or slow rate of cell division are predicted to be controlled more easily with CNS drugs, while those with a high proliferative fraction or fast cell division rate may respond better to CS drugs.« less
Rehabilitation After International Space Station Flights
NASA Technical Reports Server (NTRS)
Chauvin, S. J.; Shepherd, B. A. S.; Guilliams, M. E.; Taddeo, T.
2003-01-01
Rehabilitating U.S. crew members to preflight status following flights on the Russian Mir Space Station required longer than six months for full functional recovery of some of the seven crew members. Additional exercise hardware has been added on the International Space Station as well as a rehabilitative emphasis on functional fitness/agility and proprioception. The authors will describe and present the results of the rehabilitation program for ISS and evaluate rehabilitative needs for longer missions. Pre- and in-flight programs emphasize strength and aerobic conditioning. One year before launch, crew members are assigned an Astronaut Strength and Conditioning specialist. Crew members are scheduled for 2 hours, 3 days a week, for pre-flight training and 2.5 hours, six days a week, for in-flight training. Crewmembers are tested on functional fitness, agility, isokinetic strength, and submaximal cycle ergometer evaluation before and after flight. The information from these tests is used for exercise prescriptions, comparison, and evaluation of the astronaut and training programs. The rehabilitation program lasts for 45 days and is scheduled for 2 hours during each crew workday. Phase 1 of the rehabilitation program starts on landing day and places emphasis on ambulation, flexibility, and muscle strengthening. Phase 2 adds proprioceptive exercise and cardiovascular conditioning. Phase 3 (the longest phase) focuses on functional development. All programs are tailored specifically for each individual according to their test results, preferred recreational activities, and mission roles and duties. Most crew members reached or exceeded their preflight test values 45 days after flight. Some crew members subjectively indicated the need for a longer rehabilitation period. The current rehabilitation program for returning ISS crew members seems adequate in content but may need to be extended for longer expeditions.
NASA Technical Reports Server (NTRS)
Ensey, Tyler S.
2013-01-01
During my internship at NASA, I was a model developer for Ground Support Equipment (GSE). The purpose of a model developer is to develop and unit test model component libraries (fluid, electrical, gas, etc.). The models are designed to simulate software for GSE (Ground Special Power, Crew Access Arm, Cryo, Fire and Leak Detection System, Environmental Control System (ECS), etc. .) before they are implemented into hardware. These models support verifying local control and remote software for End-Item Software Under Test (SUT). The model simulates the physical behavior (function, state, limits and 110) of each end-item and it's dependencies as defined in the Subsystem Interface Table, Software Requirements & Design Specification (SRDS), Ground Integrated Schematic (GIS), and System Mechanical Schematic.(SMS). The software of each specific model component is simulated through MATLAB's Simulink program. The intensiv model development life cycle is a.s follows: Identify source documents; identify model scope; update schedule; preliminary design review; develop model requirements; update model.. scope; update schedule; detailed design review; create/modify library component; implement library components reference; implement subsystem components; develop a test script; run the test script; develop users guide; send model out for peer review; the model is sent out for verifictionlvalidation; if there is empirical data, a validation data package is generated; if there is not empirical data, a verification package is generated; the test results are then reviewed; and finally, the user. requests accreditation, and a statement of accreditation is prepared. Once each component model is reviewed and approved, they are intertwined together into one integrated model. This integrated model is then tested itself, through a test script and autotest, so that it can be concluded that all models work conjointly, for a single purpose. The component I was assigned, specifically, was a fluid component, a discrete pressure switch. The switch takes a fluid pressure input, and if the pressure is greater than a designated cutoff pressure, the switch would stop fluid flow.
Effect of truck operating weight on heavy-duty diesel emissions.
Gajendran, Prakash; Clark, Nigel N
2003-09-15
Heavy-duty diesel vehicles are substantial contributors of oxides of nitrogen (NO(x)) and particulate matter (PM) while carbon monoxide and hydrocarbon (HC) emissions from diesel vehicles receive less attention. Truck emissions inventories have traditionally employed average fuel economy and engine efficiency factors to translate certification into distance-specific (g/mi) data, so that inventories do not take into account the real effects of truck operating weight on emissions. The objective of this research was to examine weight corrections for class 7 and 8 vehicles (over 26 000 lb (11 793 kg) gross vehicle weight) from a theoretical point of view and to present a collection of original data on the topic. It was found by combining an empirical equation with theoretical truck loads that the NO(x) emissions increased by approximately 54% for a doubling of test weight. Emissions data were gathered from specific tests performed using different test weights and using various test schedules, which can consist of cycles or routes. It was found experimentally that NO(x) emissions have a nearly linear correlation with vehicle weight and did not vary much from vehicle to vehicle. NO(x) emissions were also found to be insensitive to transient operation in the test schedule. The observed trends correlate well with the theory presented, and hence, the NO(x) emissions can be predicted reasonably accurately using the theory. If NO(x) data were considered in fuel-specific (g/gal) units, they did not vary with the test weight. HC emissions were found to be insensitive to the vehicle weight. CO and PM emissions were found to be a strong function of weight during transient operation. Under transient operation, the CO emissions value increased by 36% for an increase in test weight from 42 000 (19 051 kg) to 56 000 lb (25 401 kg). However, CO and PM were found to be insensitive to the vehicle weight during nearly steady-state operation.
Continual planning and scheduling for managing patient tests in hospital laboratories.
Marinagi, C C; Spyropoulos, C D; Papatheodorou, C; Kokkotos, S
2000-10-01
Hospital laboratories perform examination tests upon patients, in order to assist medical diagnosis or therapy progress. Planning and scheduling patient requests for examination tests is a complicated problem because it concerns both minimization of patient stay in hospital and maximization of laboratory resources utilization. In the present paper, we propose an integrated patient-wise planning and scheduling system which supports the dynamic and continual nature of the problem. The proposed combination of multiagent and blackboard architecture allows the dynamic creation of agents that share a set of knowledge sources and a knowledge base to service patient test requests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zawislanski, P.T.; McGrath, A.E.; Benson, S.M.
1995-11-01
Research aimed at gaining a better understanding of selenium cycling in marshes and mudflats of the Carquinez Strait is being performed by scientists from Lawrence Berkeley National Laboratory and collaborators from the University of California at Davis. This work was initiated in the Fall of 1994 and is scheduled to continue through the Fall of 1996. This report summarizes the results of the effort to date.
Ahrendt, Hans-Joachim; Makalová, Dagmar; Parke, Susanne; Mellinger, Uwe; Mansour, Diana
2009-11-01
This study compared the bleeding pattern, cycle control and safety of an oral contraceptive (OC) comprising estradiol valerate/dienogest (E2V/DNG; administered using a dynamic dosing regimen) with a monophasic OC containing ethinyl estradiol 20 mcg/levonorgestrel 100 mcg (EE/LNG). E2V releases estradiol (E2), which is identical to endogenously produced 17beta-estradiol. This was a randomized, multicenter, double-blind, double-dummy trial lasting seven cycles in healthy women aged 18-50 years. Overall, 798 women were randomized and received allocated treatment (399 per group). There were significantly fewer bleeding/spotting days reported by women who received E2V/DNG than those who received EE/LNG [17.3+/-10.4 vs. 21.5+/-8.6, respectively, p<.0001, Reference Period 1 (Days 1-90); and 13.4+/-9.vs. 15.9+/-7.1, respectively, p<.0001, Reference Period 2 (Days 91-180)]. Through Cycles 1-7, the occurrence of scheduled withdrawal bleeding per cycle was 77.7-83.2% with E2V/DNG and 89.5-93.8% with EE/LNG (p<.0001 per cycle). The duration and intensity of scheduled withdrawal bleeding were reduced with E2V/DNG vs. EE/LNG. The incidence of intracyclic bleeding was similar with E2V/DNG (10.5%-18.6%) and EE/LNG (9.9%-17.1%) (p>.05 per cycle). No unintended pregnancies occurred with E2V/DNG, but there was one unintended pregnancy with EE/LNG. Adverse drug reactions occurred in 10.0% and 8.5% of women taking E2V/DNG and EE/LNG, respectively. Overall, 79.4% of women were satisfied with E2V/DNG and 79.9% with EE/LNG. A novel OC composed of E2V/DNG is associated with an acceptable bleeding profile that is comparable to that of an EE-containing OC.
Dy, Grace K; Suri, Ajit; Reid, Joel M; Sloan, Jeff A; Pitot, Henry C; Alberts, Steven R; Goldberg, Richard M; Atherton, Pamela J; Hanson, Lorelei J; Burch, Patrick A; Rubin, Joseph; Erlichman, Charles; Adjei, Alex A
2005-06-01
We have previously demonstrated that pemetrexed is clinically active when administered 90 min after gemcitabine in a phase I study. The present study was undertaken to evaluate the efficacy, toxicity, and pharmacokinetics of gemcitabine and pemetrexed when pemetrexed is administered immediately after gemcitabine. A total of 14 patients received 84 cycles of treatment. Gemcitabine 1250 mg/m(2) was administered on days 1 and 8 of each 21-day cycle, and pemetrexed 500 mg/m(2) on day 8 immediately following gemcitabine administration. Toxicities were graded according to the National Cancer Institute Common Toxicity Criteria and recorded as maximum grade per patient for all treatment cycles. Pharmacokinetic analyses of plasma gemcitabine and pemetrexed concentrations were performed. Neutropenia was the most common severe toxicity. Non-hematologic toxicities, which included nausea, vomiting, fatigue, diarrhea, rash, and elevated transaminases were of mild-to-moderate severity. No increased toxicity was observed with this schedule in comparison to the previous phase I schedule. There was no pharmacokinetic interaction between the two drugs. One partial response was documented in a patient with non-small-cell lung cancer. Eight patients had disease stabilization for five or more cycles. Gemcitabine immediately followed by pemetrexed is well tolerated and clinically active, and deserves further evaluation in phase II trials.
Response Strength in Extreme Multiple Schedules
ERIC Educational Resources Information Center
McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.
2012-01-01
Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…
Ordination of the estuarine environment: What the organism experiences
Investigators customarily schedule estuary sampling trips with regard to a variety of criteria, especially tide stage and the day-night cycle. However, estuarine organisms experience a wide suite of continuously changing tide and light conditions. Such organisms may undertake i...
Effects of sleep schedules on commercial motor vehicle driver performance : part 1
DOT National Transportation Integrated Search
2000-09-01
The Federal Motor Carrier Safety Administration sponsored a study to gather and analyze data on commercial motor vehicle (CMV) driver rest and recovery cycles, effects of partial sleep deprivation, and prediction of subsequent performance. The study ...
Effects of sleep schedules on commercial motor vehicle driver performance : part 2
DOT National Transportation Integrated Search
2000-09-01
The Federal Motor Carrier Safety Administration sponsored a study to gather and analyze data on commercial motor vehicle driver rest and recovery cycles, effects of partial sleep deprivation, and prediction of subsequent performance. The study began ...
TRUST: TDRSS Resource User Support Tool
NASA Technical Reports Server (NTRS)
Sparn, Thomas P.; Gablehouse, R. Daniel
1991-01-01
TRUST-TDRSS (Tracking Data and Relay Satellite System) Resource User Support Tool is presented in the form of the viewgraphs. The following subject areas are covered: TRUST development cycle; the TRUST system; scheduling window; ODM/GCMR window; TRUST architecture; surpass; and summary.
Microgravity effects on standardized cognitive performance measures
NASA Technical Reports Server (NTRS)
Schiflett, Samuel G.
1992-01-01
The purpose of this experiment, selected to fly on the International Microgravity Laboratory (IML-2) Spacelab mission, is to determine the effects of microgravity upon the cognitive skills which are critical to successful performance of many tasks on board the Space Shuttle. Six tests from the Unified Tri-service Cognitive Performance Assessment Battery (UTC-PAB) will be administered to the Mission Specialists to fulfill the goals of this experiment. These tests are based upon current theoretical models of human performance and the hypothesized effects of microgravity. The principle objective is the identification of the effects of microgravity upon specific information processing skills affecting performance from those of fatigue and shifts in work/rest cycles. Multiple measures of both short and long term fatigue will be obtained and used as a major independent variable for the analysis of these performance data. Scientific supporting studies will determine optimum practice and performance testing schedules for the astronauts. The same tests will be used post-flight to collect data on the recovery of any cognitive performance impairment compared with pre-flight, baseline levels.
Carboplatin hypersensitivity: evaluation and successful desensitization protocol.
Bruchim, Ilan; Goldberg, Arnon; Fishman, Ami; Confino-Cohen, Ronit
2014-01-01
Carboplatin-induced immediate hypersensitivity reactions are relatively common among patients with gynecological malignancies. Once this occurs, the patient might be at risk for future carboplatin-induced reactions. This study evaluated the efficacy of allergic consultation, carboplatin skin testing and desensitization as a single intervention strategy in this population. Patients with a well-documented immediate reaction to carboplatin were offered allergy consultation, carboplatin skin testing and a desensitization plan in a single visit between scheduled chemotherapy sessions. Fifty-five patients with an immediate reaction were evaluated. After allergist assessment, 44 (89%) of 49 patients skin tested had a positive result. A total of 207 carboplatin desensitization cycles were administered to 49 women. Among them, 10 patients had a mild immediate hypersensitivity reaction during desensitization. Five patients subsequently tolerated carboplatin administered in the prolonged desensitization protocol. In the data presented, we propose a strategy that is both cost effective and very convenient for the patient. The diagnostic procedure, including allergist consultation and skin test, can be completed in less than 2 h. In most cases where carboplatin is indispensable, desensitization can be administered without overnight hospitalization.
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
Vergauwe, Evie
2018-04-23
Refreshing is one of the mechanisms proposed to maintain information in human working memory. The mechanism is assumed to operate serially, boosting the items of a memory list one after the other. In the current study, we test the most straightforward implementation of serial refreshing, by which refreshing spontaneously reproduces the order of presentation, starting with the first memory item and cycling through the list in a forward fashion, to support short-term memory of a list. Therefore, we examined verbal serial recall performance under different instructed-refreshing schedules that varied in their similarity to cumulative, forward-order refreshing. This was done by manipulating whether instructed refreshing started with the first memory item, and whether instructed refreshing proceeded in forward order through the list. We expected recall performance to be poorer as participants were required to think of the list items in a way that was more dissimilar to what they would have done spontaneously. However, across four experiments, we observed that recall performance was not drastically affected by the nature of instructed refreshing and thus, we did not find any evidence that cumulative, forward-order refreshing supports serial verbal WM performance. © 2018 New York Academy of Sciences.
NASA Technical Reports Server (NTRS)
Boesch, Hartmut; Toon, G.; Sen, B; Li, Q. B.; Salawitch, R.; Miller, C.; Crisp, D.; Washenfelder, R.; Wennberg, P.; Natraj, V.;
2006-01-01
Global, space-based observations of atmospheric CO2 with precision, resolution, and coverage needed to monitor sources and sinks: a) Spectra of reflected/scattered sunlight in NIR CO2 and O2 bands used to estimate X(sub CO2) with large sensitivity to surface; b) A-train orbit (1:15 PM polar sun sync); c) 16 day repeat cycle samples seasonal cycle on semi-monthly intervals; and d) NASA ESSP (Earth Space System Pathfinder) scheduled for Sept 2008 launch; 2 yrs lifetime. Initial comparison of SCIAMACHY and FTS retrievals for Park Falls: a) Positive bias in X(sub CO2) of approx. 10 ppm; and b) Negative bias in surface pressure After correction of spectral artifacts in O2A band: a) Largely improved agreement between SCIAMACHY and FTS X(sub CO2) (without clear bias) and in surface pressure; and b) Standard deviation of SCIAMACHY X(sub CO2 approx. 6 ppm. Good qualitative agreement with GEOS-CHEM, with GEOS-CHEM underestimating seasonal cycle. OCO is a dedicated CO2 instrument and will achieve much higher accuracy and precision: a) much higher spectral resolution (by factor of 20); and b) smaller ground pixels (by factor of 600).
Control of rail integrity by self-adaptive scheduling of rail tests
DOT National Transportation Integrated Search
1990-06-01
A guide for the scheduling of in-service tests of rail to detect defects is presented. The guide is designed for self-adaptation to changing track conditions, as reflected by the total rate of defect occurrence per test, the rate of 'service' defect ...
Yamamoto, J Jay; Malatestinic, Bill; Lehman, Angela; Juneja, Rattan
2010-01-01
The objective of this project was to improve the timing of inpatient insulin administration related to meal delivery and the scheduling of radiology tests by Lean Six Sigma method. A multidisciplinary hospital team and a Six Sigma team from a pharmaceutical manufacturer collaborated to evaluate food delivery and radiology scheduling processes related to the timing of insulin administration. Key factors leading to problems within each system were addressed to improve the efficiency of each process while improving the timeliness of glucose testing and insulin administration. Standardizing the food delivery schedule and utilizing scorecards to track on-time meal deliveries to the floor enabled nursing to more accurately administer insulin in coordination with the delivery of meals. Increasing communication and restricting the scheduling of inpatient procedures during mealtimes reduced disruptions to insulin administration. Data at 6 months postimplementation demonstrated that the institution met goals for most primary outcome metrics including increasing on-time meal delivery and the proportion of patients taking insulin scheduled for radiology tests during appropriate times. By implementing the recommendations identified via Lean Six Sigma, this collaborative effort improved the timing of inpatient insulin administration related to meal delivery and radiology testing.
40 CFR 92.1005 - In-use locomotives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... railroad to schedule the supply of locomotives for testing in such a manner that it minimizes disruption of... schedule the supply of locomotives for testing in such a manner that it minimizes disruption of its...
Satellite antenna management system and method
NASA Technical Reports Server (NTRS)
Leath, Timothy T (Inventor); Azzolini, John D (Inventor)
1999-01-01
The antenna management system and method allow a satellite to communicate with a ground station either directly or by an intermediary of a second satellite, thus permitting communication even when the satellite is not within range of the ground station. The system and method employ five major software components, which are the control and initialization module, the command and telemetry handler module, the contact schedule processor module, the contact state machining module, and the telemetry state machine module. The control and initialization module initializes the system and operates the main control cycle, in which the other modules are called. The command and telemetry handler module handles communication to and from the ground station. The contact scheduler processor module handles the contact entry schedules to allow scheduling of contacts with the second satellite. The contact and telemetry state machine modules handle the various states of the satellite in beginning, maintaining and ending contact with the second satellite and in beginning, maintaining and ending communication with the satellite.
Scheduling reinforcement about once a day.
Eckerman, D A
1999-04-01
A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.
A De-centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments
NASA Technical Reports Server (NTRS)
Arora, Manish; Das, Sajal K.; Biswas, Rupak
2002-01-01
In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper, we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is decentralized, scalable, and overlaps the node coordination time with that of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.
A De-Centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments
NASA Technical Reports Server (NTRS)
Arora, Manish; Das, Sajal K.; Biswas, Rupak; Biegel, Bryan (Technical Monitor)
2002-01-01
In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is de-centralized, scalable, and overlaps the node coordination time of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.
DOE Office of Scientific and Technical Information (OSTI.GOV)
El-Awady, Raafat A., E-mail: relawady@sharjah.ac.ae; Department of Pharmacology and Pharmaceutics, College of Pharmacy, University of Sharjah, University City road, 27272 Sharjah; Saleh, Ekram M.
Celecoxib, an inhibitor of cyclooxygenase-2, is being investigated for enhancement of chemotherapy efficacy in cancer clinical trials. This study investigates the ability of cyclooxygenase-2 inhibitors to sensitize cells from different origins to several chemotherapeutic agents. The effect of the drug's mechanism of action and sequence of administration are also investigated. The sensitivity, cell cycle, apoptosis and DNA damage of five different cancer cell lines (HeLa, HCT116, HepG2, MCF7 and U251) to 5-FU, cisplatin, doxorubicin and etoposide {+-} celecoxib following different incubation schedules were analyzed. We found antagonism between celecoxib and the four drugs in the breast cancer cells MCF7 followingmore » all incubation schedules and between celecoxib and doxorubicin in all cell lines except for two combinations in HCT116 cells. Celecoxib with the other three drugs in the remaining four cell lines resulted in variable interactions. Mechanistic investigations revealed that celecoxib exerts different molecular effects in different cells. In some lines, it abrogates the drug-induced G2/M arrest enhancing pre-mature entry into mitosis with damaged DNA thus increasing apoptosis and resulting in synergism. In other cells, it enhances drug-induced G2/M arrest allowing time to repair drug-induced DNA damage before entry into mitosis and decreasing cell death resulting in antagonism. In some synergistic combinations, celecoxib-induced abrogation of G2/M arrest was not associated with apoptosis but permanent arrest in G1 phase. These results, if confirmed in-vivo, indicate that celecoxib is not a suitable chemosensitizer for breast cancer or with doxorubicin for other cancers. Moreover, combination of celecoxib with other drugs should be tailored to the tumor type, drug and administration schedule. - Graphical abstract: Display Omitted Highlights: > Celecoxib may enhance effects of anticancer drugs. > Its combination with four drugs was tested in five cancer cell lines. > It antagonized the effects of the four drugs in the breast cancer cell line MCF7. > Doxorubicin's cytotoxic effects were antagonized by celecoxib in four cell lines. > Cell cycle, apoptosis and DNA damage explain the different interactive effects.« less
Evaluation of undeveloped rocket engine cycle applications to advanced transportation
NASA Technical Reports Server (NTRS)
1990-01-01
Undeveloped pump-fed, liquid propellant rocket engine cycles were assessed and evaluated for application to Next Manned Transportation System (NMTS) vehicles, which would include the evolving Space Transportation System (STS Evolution), the Personnel Launch System (PLS), and the Advanced Manned Launch System (AMLS). Undeveloped engine cycles selected for further analysis had potential for increased reliability, more maintainability, reduced cost, and improved (or possibly level) performance when compared to the existing SSME and proposed STME engines. The split expander (SX) cycle, the full flow staged combustion (FFSC) cycle, and a hybrid version of the FFSC, which has a LOX expander drive for the LOX pump, were selected for definition and analysis. Technology requirements and issues were identified and analyses of vehicle systems weight deltas using the SX and FFSC cycles in AMLS vehicles were performed. A strawman schedule and cost estimate for FFSC subsystem technology developments and integrated engine system demonstration was also provided.
Scheduling viability tests for seeds in long-term storage based on a Bayesian Multi-Level Model
USDA-ARS?s Scientific Manuscript database
Genebank managers conduct viability tests on stored seeds so they can replace lots that have viability near a critical threshold, such as 50 or 85% germination. Currently, these tests are typically scheduled at uniform intervals; testing every 5 years is common. A manager needs to balance the cost...
A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.
ERIC Educational Resources Information Center
CANTER, JOHN; AND OTHERS
AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…
10 CFR 75.34 - Inventory change reports.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Transactions Reports (Inventory Change Reports), when appropriate, must be accompanied by Concise Notes... Commission, Division of Fuel Cycle Safety and Safeguards, Washington, DC 20555-0001. This Concise Note is... operational program for the facility, including particularly, but not exclusively, the schedule for taking...
10 CFR 75.34 - Inventory change reports.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Transactions Reports (Inventory Change Reports), when appropriate, must be accompanied by Concise Notes... Commission, Division of Fuel Cycle Safety and Safeguards, Washington, DC 20555-0001. This Concise Note is... operational program for the facility, including particularly, but not exclusively, the schedule for taking...
10 CFR 75.34 - Inventory change reports.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Transactions Reports (Inventory Change Reports), when appropriate, must be accompanied by Concise Notes... Commission, Division of Fuel Cycle Safety and Safeguards, Washington, DC 20555-0001. This Concise Note is... operational program for the facility, including particularly, but not exclusively, the schedule for taking...
10 CFR 75.34 - Inventory change reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Transactions Reports (Inventory Change Reports), when appropriate, must be accompanied by Concise Notes... Commission, Division of Fuel Cycle Safety and Safeguards, Washington, DC 20555-0001. This Concise Note is... operational program for the facility, including particularly, but not exclusively, the schedule for taking...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Maintenance, scheduled; test vehicles... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... vehicles. (a) Periodic maintenance on the engine, emission control system, and fuel system of test vehicles...
Pérez, Omar D; Aitken, Michael R F; Zhukovsky, Peter; Soto, Fabián A; Urcelay, Gonzalo P; Dickinson, Anthony
2016-12-15
Associative learning theories regard the probability of reinforcement as the critical factor determining responding. However, the role of this factor in instrumental conditioning is not completely clear. In fact, free-operant experiments show that participants respond at a higher rate on variable ratio than on variable interval schedules even though the reinforcement probability is matched between the schedules. This difference has been attributed to the differential reinforcement of long inter-response times (IRTs) by interval schedules, which acts to slow responding. In the present study, we used a novel experimental design to investigate human responding under random ratio (RR) and regulated probability interval (RPI) schedules, a type of interval schedule that sets a reinforcement probability independently of the IRT duration. Participants responded on each type of schedule before a final choice test in which they distributed responding between two schedules similar to those experienced during training. Although response rates did not differ during training, the participants responded at a lower rate on the RPI schedule than on the matched RR schedule during the choice test. This preference cannot be attributed to a higher probability of reinforcement for long IRTs and questions the idea that similar associative processes underlie classical and instrumental conditioning.
Mercury Conditions for the MESSENGER Mission Simulated in High- Solar-Radiation Vacuum Tests
NASA Technical Reports Server (NTRS)
Wong, Wayne A.
2003-01-01
The MESSENGER (Mercury Surface, Space Environment, Geochemistry, and Ranging) spacecraft, planned for launch in March 2004, will perform two flybys of Mercury before entering a year-long orbit of the planet in September 2009. The mission will provide opportunities for detailed characterization of the surface, interior, atmosphere, and magnetosphere of the closest planet to the Sun. The NASA Glenn Research Center and the MESSENGER spacecraft integrator, the Johns Hopkins University Applied Physics Laboratory, have partnered under a Space Act Agreement to characterize a variety of critical components and materials under simulated conditions expected near Mercury. Glenn's Vacuum Facility 6, which is equipped with a solar simulator, can simulate the vacuum and high solar radiation anticipated in Mercury orbit. The MESSENGER test hardware includes a variety of materials and components that are being characterized during the Tank 6 vacuum tests, where the hardware will be exposed to up to 11 suns insolation, simulating conditions expected in Mercury orbit. In 2002, ten solar vacuum tests were conducted, including beginning of life, end of life, backside exposure, and solar panel thermal shock cycling tests. Components tested include candidate solar array panels, sensors, thermal shielding materials, and communication devices. As an example, for the solar panel thermal shock cycling test, two candidate solar array panels were suspended on a lift mechanism that lowered the panels into a liquid-nitrogen-cooled box. After reaching -140 C, the panels were then lifted out of the box and exposed to the equivalent of 6 suns (8.1 kilowatts per square meters). After five cold soak/heating cycles were completed successfully, there was no apparent degradation in panel performance. An anticipated 100-hr thermal shield life test is planned for autumn, followed by solar panel flight qualification tests in winter. Glenn's ongoing support to the MESSENGER program has been instrumental in identifying design solutions and validating thermal performance models under a very aggressive development schedule. The test data have assisted Johns Hopkins engineers in selecting a flight solar array vendor and a thermal shield design. MESSENGER is one in a series of missions in NASA's Discovery Program. Infrared thermography provides data on the thermal gradients in the MESSENGER components during high solar insolation vacuum testing.
An investigation of reheat cracking in the weld heat affected zone of type 347 stainless steel
NASA Astrophysics Data System (ADS)
Phung-On, Isaratat
2007-12-01
Reheat cracking has been a persistent problem for welding of many alloys such as the stabilized stainless steels: Types 321 and 347 as well as Cr-Mo-V steels. Similar problem occurs in Ni-base superalloys termed "strain-age cracking". Cracking occurs during the post weld heat treatment. The HAZ is the most susceptible area due to metallurgical reactions in solid state during both heating and cooling thermal cycle. Many investigations have been conducted to understand the RHC mechanism. There is still no comprehensive mechanism to explain its underlying mechanism. In this study, there were two proposed cracking mechanisms. The first is the formation of a PFZ resulting in local weakening and strain localization. The second is the creep-like grain boundary sliding that causes microvoid formation at the grain boundaries and the triple point junctions. Cracking occurs due to the coalescence of the microvoids that form. In this study, stabilized grade stainless steel, Type 347, was selected for investigation of reheat cracking mechanism due to the simplicity of its microstructure and understanding of its metallurgical behavior. The Gleeble(TM) 3800 system was employed due to its capability for precise control of both thermal and mechanical simulation. Cylindrical samples were subjected to thermal cycles for the HAZ simulation followed by PWHT as the reheat cracking test. "Susceptibility C-curves" were plotted as a function of PWHT temperatures and time to failure at applied stress levels of 70% and 80% yield strength. These C-curves show the possible relationship of the reheat cracking susceptibility and carbide precipitation behavior. To identify the mechanism, the sample shape was modified containing two flat surfaces at the center section. These flat surfaces were electro-polished and subjected to the HAZ simulation followed by the placement of the micro-indentation arrays. Then, the reheat cracking test was performed. The cracking mechanism was identified by tracing the shifting of the micro-indentations compared to their original locations. At the 80% stress level, the cracking mechanism was identified as the PFZ weakening, while at the 70% stress as the creep-like grain boundary sliding. A design of experiment (DOE) using a D-optimal design was successfully employed in this study to investigate the effects of microstructures on the reheat cracking susceptibility. The microstructures were modified by heat treatment prior to the reheat cracking test. The grain size and cooling rate were found to have moderate effects on cracking susceptibility. The amount (volume fraction) of MC carbide (NbC) had a significant effect on time to failure. The more NbC formed prior to test, the longer time to failure, and the more resistance to reheat cracking. On the other hand, the amount of GB carbide (M23C6) had an insignificant effect. The statistical interaction between MC carbide with other testing parameters also had strong effect. The PWHT temperature also had significant effect as can be predicted from the susceptibility C-curves. The heat treatment schedules, during cooling and during heating schedules, were also investigated. During cooling schedule was the same schedule done earlier in this study. On the other hand, during heating schedule allowed the sample cool to room temperature prior microstructure modification followed by the reheat cracking test. During heating schedule showed an improvement in resistance to reheat cracking. Microstructure of the crack samples showed the intergranular cracking path and wedge shapes along cracking boundaries. There was also the evidence of grain boundary sliding as a result of the creep-like grain boundary sliding cracking mechanism. SEM showed the intergranular cracking and grain separation with precipitates decorated on the fracture surfaces. The precipitates were identified as Nb-rich, MC carbide (NbC). The fracture surfaces showed micro-ductility and microvoid coalescence. The size of microvoid corresponds to the size of precipitate that forms. In addition, there was intragranular cracking in some location indicating that another failure mechanism may also be possible. It was believed that failure may occur along a precipitate free zone. However, the distinct PFZ could not be detected. A SS-DTA technique was also implemented in order to determine precipitation temperatures of the material. The results showed the possible precipitation temperatures in the range of 850°C to 650°C. However, the results were not confidently reliable due to the small amount of carbide formed that affects the sensitivity of the SS-DTA. A simple grain boundary sliding model was generated proposing that the sliding is operated by the shear stress resulting from the formation of precipitate in the grain interior. Then, the sliding results in the microvoid formation and coalescence followed by cracking. In addition, a simple finite element model was generated to provide the illustration of the shear stress built up by the formation of precipitate. The model showed that shear stress can cause the grain boundary movement/sliding. Based on the results from this study, the recommendation for the selection of post weld heat treatment schedule as well as welding procedures can be determined for the prevention of the reheat cracking. A residual stress should be kept below the critical value during welding and post weld heat treating. The testing procedures used in this study can be applied as the guidelines to conduct the reheat cracking susceptibility test for material selection.
Design and scheduling for periodic concurrent error detection and recovery in processor arrays
NASA Technical Reports Server (NTRS)
Wang, Yi-Min; Chung, Pi-Yu; Fuchs, W. Kent
1992-01-01
Periodic application of time-redundant error checking provides the trade-off between error detection latency and performance degradation. The goal is to achieve high error coverage while satisfying performance requirements. We derive the optimal scheduling of checking patterns in order to uniformly distribute the available checking capability and maximize the error coverage. Synchronous buffering designs using data forwarding and dynamic reconfiguration are described. Efficient single-cycle diagnosis is implemented by error pattern analysis and direct-mapped recovery cache. A rollback recovery scheme using start-up control for local recovery is also presented.
Peters, V; de Rijk, A; Engels, J; Heerkens, Y; Nijhuis, F
2016-04-07
Work schedules contribute substantially to the health and well-being of nurses. Too broad typologies are used in research that do not meet the current variety in work schedules. To develop a new typology for nurses' work schedules based on five requirements and to validate the typology. This study is based on a questionnaire returned by 498 nurses (response 51%) including questions regarding nurses' work schedule, socio-demographic, and family characteristics and their appraisal of the work schedule. Frequencies of the different schedules were computed to determine the typology. To validate the typology, differences between the types were tested with ANOVAs, Chi2 and Kruskal-Wallis tests. Five main types can be distinguished based on predetermined requirements and frequencies, namely: (1) fixed early shift, (2) rotating two shift pattern without night shift, (3) rotating three shift pattern, (4) fixed and rotating two shift pattern including night shift, and (5) fixed normal day or afternoon shifts. Nurses in these types of work schedule differed significantly with respect to hours worked, days off between shifts, age, education, years in the job, commuting time, contribution to household income, satisfaction with work schedule and work schedule control. Especially nurses with type 3 schedules differed from other types. A typology of five main types of work schedules is proposed. Content validity of the typology is sufficient and the new typology seems useful for research on work-related aspects of nursing.
40 CFR 86.164-08 - Supplemental Federal Test Procedure calculations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for the test schedules of FTP, US06, and SC03. (b) The provisions of § 86.144-94(a) are applicable to... the FTP test schedule (Ywm). (c)(1) When the test vehicle is equipped with air conditioning, the final... = Mass emissions per mile for a particular pollutant weighted in terms of the contributions from the FTP...
Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course
ERIC Educational Resources Information Center
Huelskamp, Diana
2014-01-01
Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…
DOT National Transportation Integrated Search
2013-08-01
The U.S. Environmental Protection Agencys : newest emissions model, Motor Vehicle Emission : Simulator (MOVES), enables users to use local : drive schedules(representative vehicle speed : profiles) in order to perform an accurate analysis : of emi...
Yu, Yang; Wang, Sihan; Tang, Jiafu; Kaku, Ikou; Sun, Wei
2016-01-01
Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru formation and seru load. For simplicity, however, previous studies focus on the seru formation with a given scheduling rule in seru load. We select ten scheduling rules usually used in seru load to investigate the influence of different scheduling rules on the performance of line-seru conversion. Moreover, we clarify the complexities of line-seru conversion for ten different scheduling rules from the theoretical perspective. In addition, multi-objective decisions are often used in line-seru conversion. To obtain Pareto-optimal solutions of multi-objective line-seru conversion, we develop two improved exact algorithms based on reducing time complexity and space complexity respectively. Compared with the enumeration based on non-dominated sorting to solve multi-objective problem, the two improved exact algorithms saves computation time greatly. Several numerical simulation experiments are performed to show the performance improvement brought by the two proposed exact algorithms.
Stubbs, D A; Cohen, S L
1972-11-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules.
Stubbs, D. Alan; Cohen, Steven L.
1972-01-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules. PMID:16811634
Abratt, R P; Willcox, P A; de Groot, M; Goodman, H T; Jansen, E R; Salton, D G
1991-01-01
78 patients with limited disease small cell lung carcinoma (SCLC) were entered into a prospective randomised study of two combination regimens (AVE-5 and AVE-1) that differed only in the scheduling of etoposide. Patients in the AVE-5 arm received etoposide intravenously 60 mg/m2 on day 1 and orally 120 mg/m2 on days 2-5 of each cycle. Patients in the AVE-1 arm received etoposide 300 mg/m2 intravenously on day 1. Patients in both arms received doxorubicin and vincristine on day 1 of each cycle. The complete (53% vs. 26%) and the overall (75% vs. 52%) response rates were significantly higher in the AVE-5 arm. Median survival was also increased from 11 to 14 months in this arm. Toxicity was low and similar in both groups. The daily administration of etoposide in low toxicity combination therapy for SCLC is important. This can be conveniently achieved by using etoposide orally.
VAXELN Experimentation: Programming a Real-Time Periodic Task Dispatcher Using VAXELN Ada 1.1
1987-11-01
synchronization to the SQM and VAXELN semaphores. Based on real-time scheduling theory, the optimal rate-monotonic scheduling algorithm [Lui 73...schedulability test based on the rate-monotonic algorithm , namely task-lumping [Sha 871, was necessary to cal- culate the theoretically expected schedulability...8217 Guide Digital Equipment Corporation, Maynard, MA, 1986. [Lui 73] Liu, C.L., Layland, J.W. Scheduling Algorithms for Multi-programming in a Hard-Real-Time
NAD+ maintenance attenuates light induced photoreceptor degeneration Δ
Bai, Shi; Sheline, Christian T.
2013-01-01
Light-induced retinal damage (LD) occurs after surgery or sun exposure. We previously showed that zinc (Zn2+) accumulated in photoreceptors and RPE cells after LD but prior to cell death, and pyruvate or nicotinamide attenuated the resultant death perhaps by restoring nicotinamide adenine dinucleotide (NAD+) levels. We first examined the levels of NAD+ and the efficacy of pyruvate or nicotinamide in oxidative toxicities using primary retinal cultures. We next manipulated NAD+ levels in vivo and tested the affect on LD to photoreceptors and RPE. NAD+ levels cycle with a 24-h rhythm in mammals, which is affected by the feeding schedule. Therefore, we tested the affect of increasing NAD+ levels on LD by giving nicotinamide, inverting the feeding schedule, or using transgenic mice which overexpress cytoplasmic nicotinamide mononucleotide adenyl-transferase-1 (cytNMNAT1), an NAD+ synthetic enzyme. Zn2+ accumulation was also assessed in culture and in retinal sections. Retinas of light damaged animals were examined by OCT and plastic sectioning, and retinal NAD levels were measured. Day fed, or nicotinamide treated rats showed less NAD+ loss, and LD compared to night fed rats or untreated rats without changing the Zn2+ staining pattern. CytNMNAT1 showed less Zn2+ staining, NAD+ loss, and cell death after LD. In conclusion, intense light, Zn2+ and oxidative toxicities caused an increase in Zn2+, NAD+ loss, and cell death which were attenuated by NAD+ restoration. Therefore, NAD+ levels play a protective role in LD-induced death of photoreceptors and RPE cells. PMID:23274583
Waggoner, Lauren B; Grant, Devon A; Van Dongen, Hans P A; Belenky, Gregory; Vila, Bryan
2012-11-01
This study assessed the utility of a combined field and laboratory research design for measuring the impact of consecutive night shift work on the sleepiness, vigilance, and driving performance of police patrol officers. For police patrol officers working their normal night shift duty cycles, simulated driving performance and psychomotor vigilance were measured in a laboratory on two separate occasions: in the morning after the last of five consecutive 10.7-h night shifts, and at the same time in the morning after three consecutive days off duty. Order of participation in conditions was randomized among subjects. Subjects experienced manipulation of sleep schedules due to working night shifts in a real operational environment, but performance testing was conducted under controlled laboratory conditions. N = 29 active-duty police patrol officers (27 male, 2 female; age 37.1 ± 6.3 years) working night shift schedules participated in this study. Simulated driving performance, psychomotor vigilance, and subjective sleepiness were significantly degraded following 5 consecutive night shifts as compared to 3 consecutive days off duty, indicating that active-duty police officers are susceptible to performance degradation as a consequence of working nights. This combined field and laboratory research design succeeded in bridging the gap between the realism of the operational environment and the control of laboratory performance testing, demonstrating that this is a useful approach for addressing the relationship between shift work induced fatigue and critical operational task performance.
SMART operational field test evaluation : scheduler survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...
IGF-1R inhibition induces schedule-dependent sensitization of human melanoma to temozolomide
Ramcharan, Roger; Aleksic, Tamara; Kamdoum, Wilfride Petnga; Gao, Shan; Pfister, Sophia X.; Tanner, Jordan; Bridges, Esther; Asher, Ruth; Watson, Amanda J.; Margison, Geoffrey P.; Woodcock, Mick; Repapi, Emmanouela; Li, Ji-Liang; Middleton, Mark R.; Macaulay, Valentine M.
2015-01-01
Prior studies implicate type 1 IGF receptor (IGF-1R) in mediating chemo-resistance. Here, we investigated whether IGF-1R influences response to temozolomide (TMZ), which generates DNA adducts that are removed by O6-methylguanine-DNA methyltransferase (MGMT), or persist causing replication-associated double-strand breaks (DSBs). Initial assessment in 10 melanoma cell lines revealed that TMZ resistance correlated with MGMT expression (r = 0.79, p = 0.009), and in MGMT-proficient cell lines, with phospho-IGF-1R (r = 0.81, p = 0.038), suggesting that TMZ resistance associates with IGF-1R activation. Next, effects of IGF-1R inhibitors (IGF-1Ri) AZ3801 and linsitinib (OSI-906) were tested on TMZ-sensitivity, cell cycle progression and DSB induction. IGF-1Ri sensitized BRAF wild-type and mutant melanoma cells to TMZ in vitro, an effect that was independent of MGMT. Cells harboring wild-type p53 were more sensitive to IGF-1Ri, and showed schedule-dependent chemo-sensitization that was most effective when IGF-1Ri followed TMZ. This sequence sensitized to clinically-achievable TMZ concentrations and enhanced TMZ-induced apoptosis. Simultaneous or prior IGF-1Ri caused less effective chemo-sensitization, associated with increased G1 population and reduced accumulation of TMZ-induced DSBs. Clinically relevant sequential (TMZ → IGF-1Ri) treatment was tested in mice bearing A375M (V600E BRAF, wild-type p53) melanoma xenografts, achieving peak plasma/tumor IGF-1Ri levels comparable to clinical Cmax, and inducing extensive intratumoral apoptosis. TMZ or IGF-1Ri caused minor inhibition of tumor growth (gradient reduction 13%, 25% respectively), while combination treatment caused supra-additive growth delay (72%) that was significantly different from control (p < 0.01), TMZ (p < 0.01) and IGF-1Ri (p < 0.05) groups. These data highlight the importance of scheduling when combining IGF-1Ri and other targeted agents with drugs that induce replication-associated DNA damage. PMID:26497996
Real Time Energy Management Control Strategies for Hybrid Powertrains
NASA Astrophysics Data System (ADS)
Zaher, Mohamed Hegazi Mohamed
In order to improve fuel efficiency and reduce emissions of mobile vehicles, various hybrid power-train concepts have been developed over the years. This thesis focuses on embedded control of hybrid powertrain concepts for mobile vehicle applications. Optimal robust control approach is used to develop a real time energy management strategy for continuous operations. The main idea is to store the normally wasted mechanical regenerative energy in energy storage devices for later usage. The regenerative energy recovery opportunity exists in any condition where the speed of motion is in opposite direction to the applied force or torque. This is the case when the vehicle is braking, decelerating, or the motion is driven by gravitational force, or load driven. There are three main concepts for regernerative energy storing devices in hybrid vehicles: electric, hydraulic, and flywheel. The real time control challenge is to balance the system power demand from the engine and the hybrid storage device, without depleting the energy storage device or stalling the engine in any work cycle, while making optimal use of the energy saving opportunities in a given operational, often repetitive cycle. In the worst case scenario, only engine is used and hybrid system completely disabled. A rule based control is developed and tuned for different work cycles and linked to a gain scheduling algorithm. A gain scheduling algorithm identifies the cycle being performed by the machine and its position via GPS, and maps them to the gains.
NASA Technical Reports Server (NTRS)
Davis, Randal; Thalman, Nancy
1993-01-01
The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.
Regenerative flywheel storage system, volume 2
NASA Astrophysics Data System (ADS)
1980-06-01
A vehicle propulsion system was simulated on a digital computer in order to determine the optimum system operating strategies and to establish a calculated range improvement over a nonregenerative, all electric vehicle. Fabrication of the inductor motor, the flywheel, the power conditioner, and the system control are described. Test results of the system operating over the SAE J227a Schedule D driving cycle are given and are compared to the calculated value. The flywheel energy storage system consists of a solid rotor, synchronous, inductor type, flywheel drive machine electrically coupled to a dc battery electric propulsion system through a load commutated inverter. The motor/alternator unit is coupled mechanically to a small steel flywheel which provides a portion of the vehicle's accelerating energy and regenerates the vehicle's braking energy.
10 CFR 32.101 - Schedule B-prototype tests for luminous safety devices for use in aircraft.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Schedule B-prototype tests for luminous safety devices for... thermometer. (d) Shock test. The device shall be dropped upon a concrete or iron surface in a 3-foot free gravitational fall, or shall be subjected to equivalent treatment in a test device simulating such a free fall...
Tas, Faruk; Yildiz, Ibrahim; Kilic, Leyla; Ciftci, Rumeysa; Keskin, Serkan; Sen, Fatma
2016-01-01
Carboplatin-paclitaxel chemotherapy combination is the standard first-line treatment of advanced ovarian cancer and is the most commonly used treatment combination shown to be effective in advanced non-small-cell lung cancer (NSCLC). The most important dose-limiting side effect is hematologic toxicity. In this study, the severity of treatment-related myelotoxicity is compared in patients with advanced ovarian and lung cancers who received same schedule of carboplatin-paclitaxel. The study was prospectively performed from February 2009 to July 2011 and involved 103 patients with stages Ic-IV ovarian (n = 51) and advanced NSCLC (n = 52) who were administered a maximum of 6 cycles of carboplatin-paclitaxel as a first-line treatment. Full blood counts were measured before treatment, before each chemotherapy cycle during therapy, and at the first and sixth month after therapy. The median ages were 59 years (range, 35-77 years) for patients with NSCLC and 56 years (range, 38-75 years) for patients with ovarian cancer. The frequencies of anemia were 17% and 28.6% before the initiation of chemotherapy, 39.2% and 68.0% at the third cycle of treatment, and 44.2% and 45.2% at the sixth cycle of treatment in patients with NSCLC and ovarian cancer, respectively. Initial leukopenia rates were 3.4% and 0%; at the third cycle 46.0% and 41.2%; and at the sixth cycle 41.9% and 48.8% in patients with NSCLC and ovarian cancer, respectively. At the third cycle, 2.5% of the patients with NSCLC and 10.4% of the patients with ovarian cancer had thrombocytopenia, and at the sixth cycle, 23.3% of the patients with NSCLC and 25% of the patients with ovarian cancer had thrombocytopenia. Hemoglobin, leukocyte, and platelet values at the third cycle were significantly lower than those at admission in both cancer groups. Declines in hemoglobin levels in patients with NSCLC and in platelets in patients with ovarian cancer at the sixth cycle were statistically significant compared with the third cycle. In conclusion, the same schedule of chemotherapy may lead to different myelotoxicities in different types of cancer. These results should be taken into consideration in terms of supportive care and management of toxicity.
Risk Management Concepts and Guidance
1989-03-01
SUMMARY . ,den.ifying risks 5.3 PROGRAMMATIC RISK SUMMARY o Quantifying risk 5.4 SUPPORTABILITY RISK SUMMARY 55 SCHEDULE RISK SUMMARY * Use of tools to...with Life Cycle Cost Estimates," Defense Systems Management School, (Fort Belvoir). 1973. 207. Lieber, R.S., "New Approaches for Quantifying Risk and
9 CFR 381.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... establishment at the time the processing cycle begins to assure that the temperature of the contents of every... processing operation times. Temperature/time recording devices shall correspond within 15 minutes to the time... (or operating process schedules) for daily production, including minimum initial temperatures and...
9 CFR 381.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... establishment at the time the processing cycle begins to assure that the temperature of the contents of every... processing operation times. Temperature/time recording devices shall correspond within 15 minutes to the time... (or operating process schedules) for daily production, including minimum initial temperatures and...
9 CFR 381.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... establishment at the time the processing cycle begins to assure that the temperature of the contents of every... processing operation times. Temperature/time recording devices shall correspond within 15 minutes to the time... (or operating process schedules) for daily production, including minimum initial temperatures and...
9 CFR 381.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... establishment at the time the processing cycle begins to assure that the temperature of the contents of every... processing operation times. Temperature/time recording devices shall correspond within 15 minutes to the time... (or operating process schedules) for daily production, including minimum initial temperatures and...
Short Range Planning for Educational Management.
ERIC Educational Resources Information Center
Turksen, I. B.; Holzman, A. G.
A planning cycle for any autonomous university entity contains five basic processes: information storage and retrieval forecasting, resource allocation, scheduling, and a term of study with a feedback loop. The resource allocation process is investigated for the development of shortrange planning models. Dynamic models wth linear and quadratic…
Sapak, Z; Salam, M U; Minchinton, E J; MacManus, G P V; Joyce, D C; Galea, V J
2017-09-01
A weather-based simulation model, called Powdery Mildew of Cucurbits Simulation (POMICS), was constructed to predict fungicide application scheduling to manage powdery mildew of cucurbits. The model was developed on the principle that conditions favorable for Podosphaera xanthii, a causal pathogen of this crop disease, generate a number of infection cycles in a single growing season. The model consists of two components that (i) simulate the disease progression of P. xanthii in secondary infection cycles under natural conditions and (ii) predict the disease severity with application of fungicides at any recurrent disease cycles. The underlying environmental factors associated with P. xanthii infection were quantified from laboratory and field studies, and also gathered from literature. The performance of the POMICS model when validated with two datasets of uncontrolled natural infection was good (the mean difference between simulated and observed disease severity on a scale of 0 to 5 was 0.02 and 0.05). In simulations, POMICS was able to predict high- and low-risk disease alerts. Furthermore, the predicted disease severity was responsive to the number of fungicide applications. Such responsiveness indicates that the model has the potential to be used as a tool to guide the scheduling of judicious fungicide applications.
An Analysis of Task-Scheduling for a Generic Avionics Mission Computer
2006-04-01
3 3. 1. 3 Response Time Analysis........................................................................... 8 3. 2 Non - Preemptive ...Fixed Priority Scheduling ...................................................... 10 3. 2. 1 Simple Non - Preemptive Response Time Test...10 3. 2. 2 Non - Preemptive Response Time Test .................................................. 12 3. 3 Asynchronous Fixed
Change from an 8-hour shift to a 12-hour shift, attitudes, sleep, sleepiness and performance.
Lowden, A; Kecklund, G; Axelsson, J; Akerstedt, T
1998-01-01
The present study sought to evaluate the effect of a change from a rotating 3-shift (8-hour) to a 2-shift shift (12 hour) schedule on sleep, sleepiness, performance, perceived health, and well-being. Thirty-two shift workers at a chemical plant (control room operators) responded to a questionnaire a few months before a change was made in their shift schedule and 10 months after the change. Fourteen workers also filled out a diary, carried activity loggers, and carried out reaction-time tests (beginning and end of shift). Fourteen day workers served as a reference group for the questionnaires and 9 were intensively studied during a week with workdays and a free weekend. The questionnaire data showed that the shift change increased satisfaction with workhours, sleep, and time for social activities. Health, perceived accident risk, and reaction-time performance were not negatively affected. Alertness improved and subjective recovery time after night work decreased. The quick changes in the 8-hour schedule greatly increased sleep problems and fatigue. Sleepiness integrated across the entire shift cycle showed that the shift workers were less alert than the day workers, across workdays and days off (although alertness increased with the 12-hour shift). The change from 8-hour to 12-hour shifts was positive in most respects, possibly due to the shorter sequences of the workdays, the longer sequences of consecutive days off, the fewer types of shifts (easier planning), and the elimination of quick changes. The results may differ in groups with a higher work load.
A 48Cycles/MB H.264/AVC Deblocking Filter Architecture for Ultra High Definition Applications
NASA Astrophysics Data System (ADS)
Zhou, Dajiang; Zhou, Jinjia; Zhu, Jiayi; Goto, Satoshi
In this paper, a highly parallel deblocking filter architecture for H.264/AVC is proposed to process one macroblock in 48 clock cycles and give real-time support to QFHD@60fps sequences at less than 100MHz. 4 edge filters organized in 2 groups for simultaneously processing vertical and horizontal edges are applied in this architecture to enhance its throughput. While parallelism increases, pipeline hazards arise owing to the latency of edge filters and data dependency of deblocking algorithm. To solve this problem, a zig-zag processing schedule is proposed to eliminate the pipeline bubbles. Data path of the architecture is then derived according to the processing schedule and optimized through data flow merging, so as to minimize the cost of logic and internal buffer. Meanwhile, the architecture's data input rate is designed to be identical to its throughput, while the transmission order of input data can also match the zig-zag processing schedule. Therefore no intercommunication buffer is required between the deblocking filter and its previous component for speed matching or data reordering. As a result, only one 24×64 two-port SRAM as internal buffer is required in this design. When synthesized with SMIC 130nm process, the architecture costs a gate count of 30.2k, which is competitive considering its high performance.
NASA's Space Launch System: Momentum Builds Towards First Launch
NASA Technical Reports Server (NTRS)
May, Todd; Lyles, Garry
2014-01-01
NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.
Sunde, B; Ericson, J; Kumagai, K; Lundell, L; Tsai, J A; Lindblad, M; Rouvelas, I; Friesland, S; Wang, N; Nilsson, M
2016-07-01
Dysphagia is the main symptom of cancer of the esophagus and gastroesophageal junction and causing nutritional problems and weight loss, often counteracted by insertion of self-expandable metal stents or nutrition via an enteral route. Clinical observations indicate that neoadjuvant therapy may effectively and promptly alleviate dysphagia, making such nutrition supportive interventions redundant before surgical resection. The objective of the current study was to carefully study the effects of induction neoadjuvant therapy on dysphagia and its subsequent course and thereby investigate the actual need for alimentary gateways for nutritional support. Thirty-five consecutive patients scheduled for neoadjuvant therapy were recruited and assessed regarding dysphagia and appetite at baseline, after the first cycle of preoperative treatment with either chemotherapy alone or with chemoradiotherapy and before surgery. Platinum-based therapy in combination with 5-fluorouracil was administered intravenously days 1-5 every 3 weeks and consisted of three treatments. Patients receiving combined chemoradiotherapy started radiotherapy on day one of second chemotherapy cycle. They received fractions of 2 Gy/day each up to a total dose of 40 Gy. Watson and Ogilvie dysphagia scores were used to assess dysphagia, while appetite was assessed by the Edmonton Assessment System Visual analogue scale-appetite questionnaire. Patients were evaluated at regular outpatient clinic visits or by telephone. The histological tumor response in the surgical specimen was assessed using the Chirieac scale. Ten patients scheduled for neoadjuvant chemotherapy and 25 patients scheduled for chemoradiotherapy were included in the analysis. There was a significant improvement in dysphagia in both treatment groups, according to both scales, already from baseline to the completion of the first chemotherapy cycle which remained to the end of the neoadjuvant treatment (P < 0.001). Appetite also improved after the first chemotherapy cycle (P = 0.03). Body weight did not change during any type of neoadjuvant therapy. We were unable to demonstrate any association between relief of dysphagia and the degree of histological response to neoadjuvant therapy in the surgical specimen. The present study shows that a platin - 5FU-based neoadjuvant chemotherapy, with or without concomitant radiotherapy, effectively and promptly relieves dysphagia in patients presenting with cancers of the esophagus or gastroesophageal junction already after the first cycle. © 2015 International Society for Diseases of the Esophagus.
Sex differences in selecting between food and cocaine reinforcement are mediated by estrogen.
Kerstetter, Kerry A; Ballis, Maya A; Duffin-Lutgen, Stevie; Carr, Amanda E; Behrens, Alexandra M; Kippin, Tod E
2012-11-01
Cocaine-dependent women, relative to their male counterparts, report shorter cocaine-free periods and report transiting faster from first use to entering treatment for addiction. Similarly, preclinical studies indicate that female rats, particularly those in the estrus phase of their reproductive cycle, show increased operant responding for cocaine under a wide variety of schedules. Making maladaptive choices is a component of drug dependence, and concurrent reinforcement schedules that examine cocaine choice offers an animal model of the conditions of human drug use; therefore, the examination of sex differences in decision-making may be critical to understanding why women display a more severe profile of cocaine addiction than men. Accordingly, we assessed sex and estrous cycle differences in choice between food (45 mg grain pellets) and intravenous cocaine (0.4 or 1.0 mg/kg per infusion) reinforcement in male, female (freely cycling), and ovariectomized (OVX) females treated with either estrogen benzoate (EB; 5 μg per day) or vehicle. At both cocaine doses, intact female rats choose cocaine over food significantly more than male rats. However, the estrous cycle did not impact the level of cocaine choice in intact females. Nevertheless, OVX females treated with vehicle exhibited a substantially lower cocaine choice compared with those receiving daily EB or to intact females. These results demonstrate that intact females have a greater preference for cocaine over food compared with males. Furthermore, this higher preference is estrogen-dependent, but does not vary across the female reproductive cycle, suggesting that ovarian hormones regulate cocaine choice. The present findings indicate that there is a biological predisposition for females to forgo food reinforcement to obtain cocaine reinforcement, which may substantially contribute to women experiencing a more severe profile of cocaine addiction than men.
Sex Differences in Selecting Between Food and Cocaine Reinforcement are Mediated by Estrogen
Kerstetter, Kerry A; Ballis, Maya A; Duffin-Lutgen, Stevie; Carr, Amanda E; Behrens, Alexandra M; Kippin, Tod E
2012-01-01
Cocaine-dependent women, relative to their male counterparts, report shorter cocaine-free periods and report transiting faster from first use to entering treatment for addiction. Similarly, preclinical studies indicate that female rats, particularly those in the estrus phase of their reproductive cycle, show increased operant responding for cocaine under a wide variety of schedules. Making maladaptive choices is a component of drug dependence, and concurrent reinforcement schedules that examine cocaine choice offers an animal model of the conditions of human drug use; therefore, the examination of sex differences in decision-making may be critical to understanding why women display a more severe profile of cocaine addiction than men. Accordingly, we assessed sex and estrous cycle differences in choice between food (45 mg grain pellets) and intravenous cocaine (0.4 or 1.0 mg/kg per infusion) reinforcement in male, female (freely cycling), and ovariectomized (OVX) females treated with either estrogen benzoate (EB; 5 μg per day) or vehicle. At both cocaine doses, intact female rats choose cocaine over food significantly more than male rats. However, the estrous cycle did not impact the level of cocaine choice in intact females. Nevertheless, OVX females treated with vehicle exhibited a substantially lower cocaine choice compared with those receiving daily EB or to intact females. These results demonstrate that intact females have a greater preference for cocaine over food compared with males. Furthermore, this higher preference is estrogen-dependent, but does not vary across the female reproductive cycle, suggesting that ovarian hormones regulate cocaine choice. The present findings indicate that there is a biological predisposition for females to forgo food reinforcement to obtain cocaine reinforcement, which may substantially contribute to women experiencing a more severe profile of cocaine addiction than men. PMID:22871910
ERIC Educational Resources Information Center
Bonner, Tonia Anita
2012-01-01
This study examined the difference between the number of overall students, African-American students, and students with disabilities on a semester 4 x 4 block schedule who were proficient on the North Carolina Biology End-of-Course Test and the number of the same group of students on a traditional 45-50 minute yearlong schedule who were proficient…
Sleep inertia during a simulated 6-h on/6-h off fixed split duty schedule.
Hilditch, Cassie J; Short, Michelle; Van Dongen, Hans P A; Centofanti, Stephanie A; Dorrian, Jillian; Kohler, Mark; Banks, Siobhan
Sleep inertia is a safety concern for shift workers returning to work soon after waking up. Split duty schedules offer an alternative to longer shift periods, but introduce additional wake-ups and may therefore increase risk of sleep inertia. This study investigated sleep inertia across a split duty schedule. Sixteen participants (age range 21-36 years; 10 females) participated in a 9-day laboratory study with two baseline nights (10 h time in bed, [TIB]), four 24-h periods of a 6-h on/6-h off split duty schedule (5-h TIB in off period; 10-h TIB per 24 h) and two recovery nights. Two complementary rosters were evaluated, with the timing of sleep and wake alternating between the two rosters (2 am/2 pm wake-up roster versus 8 am/8 pm wake-up roster). At 2, 17, 32 and 47 min after scheduled awakening, participants completed an 8-min inertia test bout, which included a 3-min psychomotor vigilance test (PVT-B), a 3-min Digit-Symbol Substitution Task (DSST), the Karolinska Sleepiness Scale (KSS), and the Samn-Perelli Fatigue Scale (SP-Fatigue). Further testing occurred every 2 h during scheduled wakefulness. Performance was consistently degraded and subjective sleepiness/fatigue was consistently increased during the inertia testing period as compared to other testing times. Morning wake-ups (2 am and 8 am) were associated with higher levels of sleep inertia than later wake-ups (2 pm and 8 pm). These results suggest that split duty workers should recognise the potential for sleep inertia after waking, especially during the morning hours.
A criterion autoscheduler for long range planning
NASA Technical Reports Server (NTRS)
Sponsler, Jeffrey L.
1994-01-01
A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubble Space Telescope. A meta-level scheduler called the Criterion Autoscheduler for Long range planning (CASL) was created to guide SPIKE's schedule generation according to the agenda of the planning scientists. It is proposed that sufficient flexibility exists in a schedule to allow high level planning heuristics to be applied without adversely affected crucial constraints such as spacecraft efficiency. This hypothesis is supported by test data which is described.
NASA Astrophysics Data System (ADS)
Bulman, M. J.; Culver, D. W.; McIlwain, M. C.; Rochow, Richard; D'Yakov, E. K.; Smetannikov, V. P.
1993-06-01
The paper describes the Nuclear Thermal Energy (NTRE) engine, developed by taking advantage of mature fuel technology developed in the former Soviet Union, thus shortening the development schedule of this engine for moon and Mars explorations. The near-term NTRE engine has a number of features that provide safety, mission performance, cost, and risk benefits. These include: (1) high-temperature long-life CIS fuel, (2) high-pressure recuperated expander cycle, (3) assured restart, (4) long-life cooled nozzle with thin inner wall, (5) long-life turbopumps, (6) heat radiation and electrical power generation, and (7) component integration synergy. Diagrams of the reactor core, the recuperated bottoming cycle flow schematic, and the recuperated bottoming cycle engine schematic are presented.
NASA Technical Reports Server (NTRS)
Zweben, Monte
1991-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
NASA Technical Reports Server (NTRS)
Zweben, Monte
1991-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
NASA Technical Reports Server (NTRS)
Zweben, Monte
1993-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ...
8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 22 of 148; file no. 1320/73. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Hybrid Modeling for Testing Intelligent Software for Lunar-Mars Closed Life Support
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Nicholson, Leonard S. (Technical Monitor)
1999-01-01
Intelligent software is being developed for closed life support systems with biological components, for human exploration of the Moon and Mars. The intelligent software functions include planning/scheduling, reactive discrete control and sequencing, management of continuous control, and fault detection, diagnosis, and management of failures and errors. Four types of modeling information have been essential to system modeling and simulation to develop and test the software and to provide operational model-based what-if analyses: discrete component operational and failure modes; continuous dynamic performance within component modes, modeled qualitatively or quantitatively; configuration of flows and power among components in the system; and operations activities and scenarios. CONFIG, a multi-purpose discrete event simulation tool that integrates all four types of models for use throughout the engineering and operations life cycle, has been used to model components and systems involved in the production and transfer of oxygen and carbon dioxide in a plant-growth chamber and between that chamber and a habitation chamber with physicochemical systems for gas processing.
NASA Technical Reports Server (NTRS)
Textor, G. P.; Kelly, L. B.; Kelly, M.
1972-01-01
The Deep Space Tracking and Data System activities in support of the Mariner Mars 1971 project from the first trajectory correction maneuver on 4 June 1971 through cruise and orbit insertion on 14 November 1971 are presented. Changes and updates to the TDS requirements and to the plan and configuration plus detailed information on the TDS flight support performance evaluation and the preorbital testing and training are included. With the loss of Mariner 8 at launch, a few changes to the Mariner Mars 1971 requirements, plan, and configuration were necessitated. Mariner 9 is now assuming the former mission plan of Mariner 8, including the TV mapping cycles and a 12-hr orbital period. A second trajectory correction maneuver was not required because of the accuracy of the first maneuver. All testing and training for orbital operations were completed satisfactorily and on schedule. The orbit insertion was accomplished with excellent results.
Life Cycle Assessment of Cooking Fuel Systems in India, China, Kenya, and Ghana (Slides)
This presentation was requested by the Global Alliance to augment they scheduled to present update on the use of LCA to better understand implications of future policy that consider all pollutants including criteria, air toxics, and other pollutants impacting air quality concerns...
Footing the bill: patient portals, part I.
Lawrence, Daphne
2009-05-01
Tie financial portal strategy into overall portal strategy. Savings from patient portals for finance come in the areas of call center volumes, bill pay, scheduling, and increased volume. Financial functions on the patient portal should be balanced with clinical functions. Improve the revenue cycle process before going to a portal.
Teaching Chronobiology and Sleep Habits in School and University
ERIC Educational Resources Information Center
Azevedo, Carolina V. M.; Sousa, Ivanise; Paul, Ketema; MacLeish, Marlene Y.; Mondejar, Ma Teresa; Sarabia, Juan Antonio; Rol, M. Angeles; Madrid, Juan Antonio
2008-01-01
Early morning school schedules are in the opposite direction to the sleep-wake cycle in adolescence and early adulthood. This conflict leads to sleep deprivation and irregular patterns whose consequences are scarcely explored. This article discusses the effects of three educational experiences with high school students, parents, teachers, and…
Family Life Satisfaction across Positional Roles, Family Development Categories and SES.
ERIC Educational Resources Information Center
Tiffany, Phyllis G.
Marital satisfaction across the life cycle differs for men and women. To investigate family life satisfaction across positional roles, developmental categories, and socioeconomic status (SES), 100 husbands and wives (families) were administered the Heimler Schedule of Social Functioning (SOSF), which relates social function and stressors (work,…
GRACE-FO Spacecraft (Artist's Rendering)
2018-04-25
Artist's rendering of the twin spacecraft of the Gravity Recovery and Climate Experiment Follow-On (GRACE-FO) mission, scheduled to launch in May, 2018. GRACE-FO will track the evolution of Earth's water cycle by monitoring changes in the distribution of mass on Earth. https://photojournal.jpl.nasa.gov/catalog/PIA22431
Advanced Gas Turbine (AGT): Power-train system development
NASA Technical Reports Server (NTRS)
Helms, H. E.; Johnson, R. A.; Gibson, R. K.; Smith, L. B.
1983-01-01
Technical work on the design and effort leading to the testing of a 74.5 kW (100 hp) automotive gas turbine is described. The general effort was concentrated on building an engine for test starting in July. The buildup progressed with only routine problems and the engine was delivered to the test stand 9 July. In addition to the engine build effort, work continued in selected component areas. Ceramic turbine parts were built and tested. Burst tests of ceramic rotors show strengths are approaching that achieved in test bars; proof testing is required for acceptable strength ceramic vanes. Over 25 hours was accumulated on the combustor rig in three test modes: pilot nozzle only, start nozzle, and main nozzle operation. Satisfactory ignition was achieved for a wide range of starting speeds and the lean blowout limit was as low as 0.06 kg/b (0.14 lb/hr). Lean blowout was more a function of nozzle atomization than fuel/air ratio. A variety of cycle points were tested. Transition from start nozzle flow to main nozzle flow was done manually without difficulty. Regenerator parts were qualification tested without incident and the parts were assembled on schedule. Rig based performance matched first build requirements. Repeated failures in the harmonic drive gearbox during rig testing resulted in that concept being abandoned for an alternate scheme.
Yoon, Seungju; Collins, John; Thiruvengadam, Arvind; Gautam, Mridul; Herner, Jorn; Ayala, Alberto
2013-08-01
Engine and exhaust control technologies applied to compressed natural gas (CNG) transit buses have advanced from lean-burn, to lean-burn with oxidation catalyst (OxC), to stoichiometric combustion with three-way catalyst (TWC). With this technology advancement, regulated gaseous and particulate matter emissions have been significantly reduced. Two CNG transit buses equipped with stoichiometric combustion engines and TWCs were tested on a chassis dynamometer, and their emissions were measured. Emissions from the stoichiometric engines with TWCs were then compared to the emissions from lean-burn CNG transit buses tested in previous studies. Stoichiometric combustion with TWC was effective in reducing emissions of oxides of nitrogen (NO(x)), particulate matter (PM), and nonmethane hydrocarbon (NMHC) by 87% to 98% depending on pollutants and test cycles, compared to lean combustion. The high removal efficiencies exceeded the emission reduction required from the certification standards, especially for NO(x) and PM. While the certification standards require 95% and 90% reductions for NO(x) and PM, respectively, from the engine model years 1998-2003 to the engine model year 2007, the measured NO(x) and PM emissions show 96% and 95% reductions, respectively, from the lean-burn engines to the stoichiometric engines with TWC over the transient Urban Dynamometer Driving Schedule (UDDS) cycle. One drawback of stoichiometric combustion with TWC is that this technology produces higher carbon monoxide (CO) emissions than lean combustion. In regard to controlling CO emissions, lean combustion with OxC is more effective than stoichiometric combustion. Stoichiometric combustion with TWC produced higher greenhouse gas (GHG) emissions including carbon dioxide (CO2) and methane (CH4) than lean combustion during the UDDS cycle, but lower GHG emissions during the steady-state cruise cycle. Stoichiometric combustion with three-way catalyst is currently the best emission control technology available for compressed natural gas (CNG) transit buses to meet the stringent U.S. Environmental Protection Agency (EPA) 2010 heavy-duty engine NO(x) emissions standard. For existing lean-burn CNG transit buses in the fleet, oxidation catalyst would be the most effective retrofit technology for the control of NMHC and CO emissions.
NASA Technical Reports Server (NTRS)
Chevalley, Eric; Parke, Bonny; Kraut, Josh M.; Bienert, Nancy; Omar, Faisal; Palmer, Everett A.
2015-01-01
In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.
One approach for evaluating the Distributed Computing Design System (DCDS)
NASA Technical Reports Server (NTRS)
Ellis, J. T.
1985-01-01
The Distributed Computer Design System (DCDS) provides an integrated environment to support the life cycle of developing real-time distributed computing systems. The primary focus of DCDS is to significantly increase system reliability and software development productivity, and to minimize schedule and cost risk. DCDS consists of integrated methodologies, languages, and tools to support the life cycle of developing distributed software and systems. Smooth and well-defined transistions from phase to phase, language to language, and tool to tool provide a unique and unified environment. An approach to evaluating DCDS highlights its benefits.
Scott, Katherine Ann; Shah, Sini; Dalgleish, Angus George; Liu, Wai Man
2013-10-01
Cannabinoids are the bioactive components of the Cannabis plant that display a diverse range of therapeutic qualities. We explored the activity of six cannabinoids, used both alone and in combination in leukaemic cells. Cannabinoids were cytostatic and caused a simultaneous arrest at all phases of the cell cycle. Re-culturing pre-treated cells in drug-free medium resulted in dramatic reductions in cell viability. Furthermore, combining cannabinoids was not antagonistic. We suggest that the activities of some cannabinoids are influenced by treatment schedules; therefore, it is important to carefully select the most appropriate strategy in order to maximise their efficacy.
Plasticity of the Intrinsic Period of the Human Circadian Timing System
Scheer, Frank A.J.L.; Wright, Kenneth P.; Kronauer, Richard E.; Czeisler, Charles A.
2007-01-01
Human expeditions to Mars will require adaptation to the 24.65-h Martian solar day-night cycle (sol), which is outside the range of entrainment of the human circadian pacemaker under lighting intensities to which astronauts are typically exposed. Failure to entrain the circadian time-keeping system to the desired rest-activity cycle disturbs sleep and impairs cognitive function. Furthermore, differences between the intrinsic circadian period and Earth's 24-h light-dark cycle underlie human circadian rhythm sleep disorders, such as advanced sleep phase disorder and non-24-hour sleep-wake disorders. Therefore, first, we tested whether exposure to a model-based lighting regimen would entrain the human circadian pacemaker at a normal phase angle to the 24.65-h Martian sol and to the 23.5-h day length often required of astronauts during short duration space exploration. Second, we tested here whether such prior entrainment to non-24-h light-dark cycles would lead to subsequent modification of the intrinsic period of the human circadian timing system. Here we show that exposure to moderately bright light (∼450 lux; ∼1.2 W/m2) for the second or first half of the scheduled wake episode is effective for entraining individuals to the 24.65-h Martian sol and a 23.5-h day length, respectively. Estimations of the circadian periods of plasma melatonin, plasma cortisol, and core body temperature rhythms collected under forced desynchrony protocols revealed that the intrinsic circadian period of the human circadian pacemaker was significantly longer following entrainment to the Martian sol as compared to following entrainment to the 23.5-h day. The latter finding of after-effects of entrainment reveals for the first time plasticity of the period of the human circadian timing system. Both findings have important implications for the treatment of circadian rhythm sleep disorders and human space exploration. PMID:17684566
Simulated shift work in rats perturbs multiscale regulation of locomotor activity
Hsieh, Wan-Hsin; Escobar, Carolina; Yugay, Tatiana; Lo, Men-Tzung; Pittman-Polletta, Benjamin; Salgado-Delgado, Roberto; Scheer, Frank A. J. L.; Shea, Steven A.; Buijs, Ruud M.; Hu, Kun
2014-01-01
Motor activity possesses a multiscale regulation that is characterized by fractal activity fluctuations with similar structure across a wide range of timescales spanning minutes to hours. Fractal activity patterns are disturbed in animals after ablating the master circadian pacemaker (suprachiasmatic nucleus, SCN) and in humans with SCN dysfunction as occurs with aging and in dementia, suggesting the crucial role of the circadian system in the multiscale activity regulation. We hypothesized that the normal synchronization between behavioural cycles and the SCN-generated circadian rhythms is required for multiscale activity regulation. To test the hypothesis, we studied activity fluctuations of rats in a simulated shift work protocol that was designed to force animals to be active during the habitual resting phase of the circadian/daily cycle. We found that these animals had gradually decreased mean activity level and reduced 24-h activity rhythm amplitude, indicating disturbed circadian and behavioural cycles. Moreover, these animals had disrupted fractal activity patterns as characterized by more random activity fluctuations at multiple timescales from 4 to 12 h. Intriguingly, these activity disturbances exacerbated when the shift work schedule lasted longer and persisted even in the normal days (without forced activity) following the shift work. The disrupted circadian and fractal patterns resemble those of SCN-lesioned animals and of human patients with dementia, suggesting a detrimental impact of shift work on multiscale activity regulation. PMID:24829282
Space Power Facility at NASA’s Plum Brook Station
1969-02-21
Exterior view of the Space Power Facility at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The $28.4-million facility, which began operations in 1969, is the largest high vacuum chamber ever built. The chamber is 100 feet in diameter and 120 feet high. It produces a vacuum deep enough to simulate the conditions at 300 miles altitude. The facility can sustain a high vacuum; simulate solar radiation via a 4-megawatt quartz heat lamp array, solar spectrum by a 400-kilowatt arc lamp, and cold environments. The Space Power Facility was originally designed to test nuclear power sources for spacecraft during long durations in a space atmosphere, but it was never used for that purpose. The facility’s first test in 1970 involved a 15 to 20-kilowatt Brayton Cycle Power System for space applications. Three different methods of simulating solar heat were employed during the Brayton tests. The facility was also used for jettison tests of the Centaur Standard Shroud. The shroud was designed for the new Titan-Centaur rocket that was scheduled to launch the Viking spacecraft to Mars. The new shroud was tested under conditions that simulated the time from launch to the separation of the stages. Test programs at the facility include high-energy experiments, shroud separation tests, Mars Lander system tests, deployable Solar Sail tests and International Space Station hardware tests.
AMS-02 Cryocooler Baseline Configuration and Engineering Model Qualification Test Results
NASA Technical Reports Server (NTRS)
Banks, Stuart; Breon, Susan; Shirey, Kimberly
2003-01-01
Four Sunpower M87N Stirling-cycle cryocoolers will be used to extend the lifetime of the Alpha Magnetic Spectrometer-02 (AMS-02) experiment. The cryocoolers will be mounted to the AMS-02 vacuum case using a structure that will thermally and mechanically decouple the cryocooler from the vacuum case while providing compliance to allow force attenuation using a passive balancer system. The cryocooler drive is implemented using a 60Hz pulse duration modulated square wave. Details of the testing program, mounting assembly and drive scheme will be presented. AMS-02 is a state-of-the-art particle physics detector containing a large superfluid helium-cooled superconducting magnet. Highly sensitive detector plates inside the magnet measure a particle s speed, momentum, charge, and path. The AMS-02 experiment, which will be flown as an attached payload on the International Space Station, will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. Two engineering model cryocoolers have been under test at NASA Goddard since November 2001. Qualification testing of the engineering model cryocooler bracket assembly is near completion. Delivery of the flight cryocoolers to Goddard is scheduled for September 2003.
Characterization testing of MEASAT GaAs/Ge solar cell assemblies
NASA Technical Reports Server (NTRS)
Brown, Mike R.; Garcia, Curtis A.; Goodelle, George S.; Powe, Joseph S.; Schwartz, Joel A.
1996-01-01
The first commercial communications satellite with gallium-arsenide on germanium (GaAs/Ge) solar arrays is scheduled for launch in December 1995. The spacecraft, named MEASAT, was built by Hughes Space and Communications Company. The solar cell assemblies consisted of large area GaAs/Ge cells supplied by Spectrolab Inc. with infrared reflecting (IRR) coverglass supplied by Pilkington Space Technology. A comprehensive characterization program was performed on the GaAs/Ge solar cell assemblies used on the MEASAT array. This program served two functions; first to establish the database needed to accurately predict on-orbit performance under a variety of conditions; and second, to demonstrate the ability of the solar cell assemblies to withstand all mission environments while still providing the required power at end-of-life. Characterization testing included measurement of electrical performance parameters as a function of radiation exposure, temperature, and angle of incident light; reverse bias stability; optical and thermal properties; mechanical strength tests, panel fabrication, humidity and thermal cycling environmental tests. The results provided a complete database enabling the design of the MEASAT solar array, and demonstrated that the GaAs/Ge cells meet the spacecraft requirements at end-of-life.
Characterization testing of MEASAT GaAs/Ge solar cell assemblies
NASA Technical Reports Server (NTRS)
Brown, Mike R.; Garcia, Curtis A.; Goodelle, George S.; Powe, Joseph S.; Schwartz, Joel A.
1995-01-01
The first commercial communications satellite with gallium-arsenide on germanium (GaAs/Ge) solar arrays is scheduled for launch in December 1995. The spacecraft, named MEASAT, was built by hughes Space and Telecommunications company for Binariang Satellite Systems of Malaysia. The solar cell assemblies consisted of large area GaAs/Ge cells supplied by Spectrolab Inc. with infrared reflecting (IRR) coverglass supplied by Pilkington Space Technology. A comprehensive characterization program was performed on the GaAs/Ge solar cell assemblies used on the MEASAT array. This program served two functions; first to establish the database needed to accurately predict on-orbit performance under a variety of conditions; and second, to demonstrate the ability of the solar cell assemblies to withstand all mission environments while still providing the required power at end-of-life. characterization testing included measurement of electrical performance parameters as a function of radiation exposure, temperature, and angle of incident light; reverse bias stability; optical and thermal properties; mechanical strength tests, panel fabrication, humidity and thermal cycling environmental tests. The results provided a complete database enabling the design of the MEASAT solar array, and demonstrated that the GaAs/Ge cells meet the spacecraft requirements at end-of-life.
Naval Postgraduate School Solar Cell Array Tester
2010-12-01
PROGRAM MANAGEMENT ................................45 1. SCHEDULE .....................................47 B. BUDGET...budget and schedule from December 2009 to September 2010. In addition, a total development cost estimate, including labor, equipment, and testing... scheduler becomes active, all tasks become eligible to run, and normal operations begin. Figure 21 shows a diagram of the startup actions [32
Simulated annealing with probabilistic analysis for solving traveling salesman problems
NASA Astrophysics Data System (ADS)
Hong, Pei-Yee; Lim, Yai-Fung; Ramli, Razamin; Khalid, Ruzelan
2013-09-01
Simulated Annealing (SA) is a widely used meta-heuristic that was inspired from the annealing process of recrystallization of metals. Therefore, the efficiency of SA is highly affected by the annealing schedule. As a result, in this paper, we presented an empirical work to provide a comparable annealing schedule to solve symmetric traveling salesman problems (TSP). Randomized complete block design is also used in this study. The results show that different parameters do affect the efficiency of SA and thus, we propose the best found annealing schedule based on the Post Hoc test. SA was tested on seven selected benchmarked problems of symmetric TSP with the proposed annealing schedule. The performance of SA was evaluated empirically alongside with benchmark solutions and simple analysis to validate the quality of solutions. Computational results show that the proposed annealing schedule provides a good quality of solution.
Developmental kinetics of pig embryos by parthenogenetic activation or by handmade cloning.
Li, J; Li, R; Liu, Y; Villemoes, K; Purup, S; Callesen, H
2013-10-01
The developmental kinetics of pig embryos produced by parthenogenetic activation without (PAZF) or with (PAZI) zona pellucida or by handmade cloning (HMC) was compared by time-lapse videography. After cumulus cell removal, the matured oocytes were either left zona intact (PAZI) or were made zona free by pronase digestion (PAZF) before they were activated (PA). Other matured oocytes were used for HMC based on foetal fibroblast cells. On Day 0 (day of PA or reconstruction), the embryos were cultured for 7 days in vitro in our time-lapse system. Pictures were taken every 30 min, and afterwards, each cell cycle was identified for each embryo to be analysed. Results showed that the PA embryos (both PAZF and PAZI) had shorter first cell cycle compared with HMC (17.4. 17.8 vs 23.6 h), but had a longer time length from four cell to morula stages (57.9, 53.8 vs 44.9 h). However, at the second cell cycle, PAZF embryos needed shorter time, while PAZI embryos had similar time length as HMC embryos, and both were longer than PAZF (23.4, 24.8 vs 14.6 h). Both PAZF and PAZI embryos used similar time to reach the blastocyst stage, and this was later than HMC embryos. In addition, when all of these embryos were grouped into viable (developed to blastocysts) and non-viable (not developed to blastocysts), the only difference in the time length was observed on the first cell cycle (18.6 vs 24.5 h), but not on the later cell cycles. In conclusion, our results not only give detailed information regarding the time schedule of in vitro-handled pig embryos, but also indicate that the first cell cycle could be used as a selecting marker for embryo viability. However, to evaluate the effect of the produced techniques, the whole time schedule of the pre-implantation developmental kinetics should be observed. © 2013 Blackwell Verlag GmbH.
Optimizing MRI Logistics: Prospective Analysis of Performance, Efficiency, and Patient Throughput.
Beker, Kevin; Garces-Descovich, Alejandro; Mangosing, Jason; Cabral-Goncalves, Ines; Hallett, Donna; Mortele, Koenraad J
2017-10-01
The objective of this study is to optimize MRI logistics through evaluation of MRI workflow and analysis of performance, efficiency, and patient throughput in a tertiary care academic center. For 2 weeks, workflow data from two outpatient MRI scanners were prospectively collected and stratified by value added to the process (i.e., value-added time, business value-added time, or non-value-added time). Two separate time cycles were measured: the actual MRI process cycle as well as the complete length of patient stay in the department. In addition, the impact and frequency of delays across all observations were measured. A total of 305 MRI examinations were evaluated, including body (34.1%), neurologic (28.9%), musculoskeletal (21.0%), and breast examinations (16.1%). The MRI process cycle lasted a mean of 50.97 ± 24.4 (SD) minutes per examination; the mean non-value-added time was 13.21 ± 18.77 minutes (25.87% of the total process cycle time). The mean length-of-stay cycle was 83.51 ± 33.63 minutes; the mean non-value-added time was 24.33 ± 24.84 minutes (29.14% of the total patient stay). The delay with the highest frequency (5.57%) was IV or port placement, which had a mean delay of 22.82 minutes. The delay with the greatest impact on time was MRI arthrography for which joint injection of contrast medium was necessary but was not accounted for in the schedule (mean delay, 42.2 minutes; frequency, 1.64%). Of 305 patients, 34 (11.15%) did not arrive at or before their scheduled time. Non-value-added time represents approximately one-third of the total MRI process cycle and patient length of stay. Identifying specific delays may expedite the application of targeted improvement strategies, potentially increasing revenue, efficiency, and overall patient satisfaction.
Kosmadopoulos, Anastasi; Sargent, Charli; Darwent, David; Zhou, Xuan; Dawson, Drew; Roach, Gregory D
2014-12-01
Extended wakefulness, sleep loss, and circadian misalignment are factors associated with an increased accident risk in shiftwork. Splitting shifts into multiple shorter periods per day may mitigate these risks by alleviating prior wake. However, the effect of splitting the sleep-wake schedule on the homeostatic and circadian contributions to neurobehavioural performance and subjective assessments of one's ability to perform are not known. Twenty-nine male participants lived in a time isolation laboratory for 13 d, assigned to one of two 28-h forced desynchrony (FD) schedules. Depending on the assigned schedule, participants were provided the same total time in bed (TIB) each FD cycle, either consolidated into a single period (9.33 h TIB) or split into two equal halves (2 × 4.67 h TIB). Neurobehavioural performance was regularly assessed with a psychomotor vigilance task (PVT) and subjectively-assessed ability was measured with a prediction of performance on a visual analogue scale. Polysomnography was used to assess sleep, and core body temperature was recorded to assess circadian phase. On average, participants obtained the same amount of sleep in both schedules, but those in the split schedule obtained more slow wave sleep (SWS) on FD days. Mixed-effects ANOVAs indicated no overall difference between the standard and split schedules in neurobehavioural performance or predictions of performance. Main effects of circadian phase and prior wake were present for both schedules, such that performance and subjective ratings of ability were best around the circadian acrophase, worst around the nadir, and declined with increasing prior wake. There was a schedule by circadian phase interaction for all neurobehavioural performance metrics such that performance was better in the split schedule than the standard schedule around the nadir. There was no such interaction for predictions of performance. Performance during the standard schedule was significantly better than the split schedule at 2 h of prior wake, but declined at a steeper rate such that the schedules converged by 4.5-7 h of prior wake. Overall, the results indicate that when the total opportunity for sleep per day is satisfactory, a split sleep-wake schedule is not detrimental to sleep or performance. Indeed, though not reflected in subjective assessments of performance capacity, splitting the schedule may be of some benefit, given its reduction of neurobehavioural impairment at night and its association with increased SWS. Therefore, for some industries that require operations to be sustained around the clock, implementing a split work-rest schedule may be of assistance.
Time-optimum packet scheduling for many-to-one routing in wireless sensor networks
Song, W.-Z.; Yuan, F.; LaHuser, R.
2007-01-01
This paper studies the WSN application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs max(2N(u1) - 1, N(u 0) -1) time slots, assuming each node reports one unit of data in each round. Here N(u0) is the total number of sensors, while N(u 1) denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also eliminated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle. ??2006 IEEE.
Time-optimum packet scheduling for many-to-one routing in wireless sensor networks
Song, W.-Z.; Yuan, F.; LaHusen, R.; Shirazi, B.
2007-01-01
This paper studies the wireless sensor networks (WSN) application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs [image omitted], N(u0)-1) time slots, assuming each node reports one unit of data in each round. Here [image omitted] is the total number of sensors, while [image omitted] denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet-scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also mitigated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle.
Orbit transfer vehicle engine study, phase A extension. Volume 2A: Study results
NASA Technical Reports Server (NTRS)
1980-01-01
Engine trade studies and systems analyses leading to a baseline engine selection for advanced expander cycle engine are discussed with emphasis on: (1) performance optimization of advanced expander cycle engines in the 10 to 20K pound thrust range; (2) selection of a recommended advanced expander engine configuration based on maximized performance and minimized mission risk, and definition of the components for this configuration; (3) characterization of the low thrust adaptation requirements and performance for the staged combustion engine; (4) generation of a suggested safety and reliability approach for OTV engines independent of engine cycle; (5) definition of program risk relationships between expander and staged combustion cycle engines; and (6) development of schedules and costs for the DDT&E, production, and operation phases of the 10K pound thrust expander engine program.
Schell, Greggory J; Lavieri, Mariel S; Helm, Jonathan E; Liu, Xiang; Musch, David C; Van Oyen, Mark P; Stein, Joshua D
2014-08-01
To determine whether dynamic and personalized schedules of visual field (VF) testing and intraocular pressure (IOP) measurements result in an improvement in disease progression detection compared with fixed interval schedules for performing these tests when evaluating patients with open-angle glaucoma (OAG). Secondary analyses using longitudinal data from 2 randomized controlled trials. A total of 571 participants from the Advanced Glaucoma Intervention Study (AGIS) and the Collaborative Initial Glaucoma Treatment Study (CIGTS). Perimetric and tonometric data were obtained for AGIS and CIGTS trial participants and used to parameterize and validate a Kalman filter model. The Kalman filter updates knowledge about each participant's disease dynamics as additional VF tests and IOP measurements are obtained. After incorporating the most recent VF and IOP measurements, the model forecasts each participant's disease dynamics into the future and characterizes the forecasting error. To determine personalized schedules for future VF tests and IOP measurements, we developed an algorithm by combining the Kalman filter for state estimation with the predictive power of logistic regression to identify OAG progression. The algorithm was compared with 1-, 1.5-, and 2-year fixed interval schedules of obtaining VF and IOP measurements. Length of diagnostic delay in detecting OAG progression, efficiency of detecting progression, and number of VF and IOP measurements needed to assess for progression. Participants were followed in the AGIS and CIGTS trials for a mean (standard deviation) of 6.5 (2.8) years. Our forecasting model achieved a 29% increased efficiency in identifying OAG progression (P<0.0001) and detected OAG progression 57% sooner (reduced diagnostic delay) (P = 0.02) than following a fixed yearly monitoring schedule, without increasing the number of VF tests and IOP measurements required. The model performed well for patients with mild and advanced disease. The model performed significantly more testing of patients who exhibited OAG progression than nonprogressing patients (1.3 vs. 1.0 tests per year; P<0.0001). Use of dynamic and personalized testing schedules can enhance the efficiency of OAG progression detection and reduce diagnostic delay compared with yearly fixed monitoring intervals. If further validation studies confirm these findings, such algorithms may be able to greatly enhance OAG management. Copyright © 2014 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.
Research on schedulers for astronomical observatories
NASA Astrophysics Data System (ADS)
Colome, Josep; Colomer, Pau; Guàrdia, Josep; Ribas, Ignasi; Campreciós, Jordi; Coiffard, Thierry; Gesa, Lluis; Martínez, Francesc; Rodler, Florian
2012-09-01
The main task of a scheduler applied to astronomical observatories is the time optimization of the facility and the maximization of the scientific return. Scheduling of astronomical observations is an example of the classical task allocation problem known as the job-shop problem (JSP), where N ideal tasks are assigned to M identical resources, while minimizing the total execution time. A problem of higher complexity, called the Flexible-JSP (FJSP), arises when the tasks can be executed by different resources, i.e. by different telescopes, and it focuses on determining a routing policy (i.e., which machine to assign for each operation) other than the traditional scheduling decisions (i.e., to determine the starting time of each operation). In most cases there is no single best approach to solve the planning system and, therefore, various mathematical algorithms (Genetic Algorithms, Ant Colony Optimization algorithms, Multi-Objective Evolutionary algorithms, etc.) are usually considered to adapt the application to the system configuration and task execution constraints. The scheduling time-cycle is also an important ingredient to determine the best approach. A shortterm scheduler, for instance, has to find a good solution with the minimum computation time, providing the system with the capability to adapt the selected task to varying execution constraints (i.e., environment conditions). We present in this contribution an analysis of the task allocation problem and the solutions currently in use at different astronomical facilities. We also describe the schedulers for three different projects (CTA, CARMENES and TJO) where the conclusions of this analysis are applied to develop a suitable routine.
Vacuum application of thermal barrier plasma coatings
NASA Technical Reports Server (NTRS)
Holmes, R. R.; Mckechnie, T. N.
1988-01-01
Coatings are presently applied to Space Shuttle Main Engine (SSME) turbine blades for protection against the harsh environment realized in the engine during lift off-to-orbit. High performance nickel, chromium, aluminum, and yttrium (NiCrAlY) alloy coatings, which are applied by atmospheric plasma spraying, crack and spall off because of the severe thermal shock experienced during start-up and shut-down of the engine. Ceramic coatings of yttria stabilized zirconia (ZrO2-Y2O3) were applied initially as a thermal barrier over coating to the NiCrAlY but were removed because of even greater spalling. Utilizing a vacuum plasma spraying process, bond coatings of NiCrAlY were applied in a low pressure atmosphere of argon/helium, producing significantly improved coating-to-blade bonding. The improved coatings showed no spalling after 40 MSFC burner rig thermal shock cycles, cycling between 1700 and -423 F. The current atmospheric plasma NiCrAlY coatings spalled during 25 test cycles. Subsequently, a process was developed for applying a durable thermal barrier coating of ZrO2-Y2O3 to the turbine blades of first stage high-pressure fuel turbopumps utilizing the vacuum plasma process. The improved thermal barrier coating has successfully passed 40 burner rig thermal shock cycles without spalling. Hot firing in an SSME turbine engine is scheduled for the blades. Tooling was installed in preparation for vacuum plasma spray coating other SSME hardware, e.g., the titanium main fuel valve housing (MFVH) and the fuel turbopump nozzle/stator.
Development of Next Generation Memory Test Experiment for Deployment on a Small Satellite
NASA Technical Reports Server (NTRS)
MacLeod, Todd; Ho, Fat D.
2012-01-01
The original Memory Test Experiment successfully flew on the FASTSAT satellite launched in November 2010. It contained a single Ramtron 512K ferroelectric memory. The memory device went through many thousands of read/write cycles and recorded any errors that were encountered. The original mission length was schedule to last 6 months but was extended to 18 months. New opportunities exist to launch a similar satellite and considerations for a new memory test experiment should be examined. The original experiment had to be designed and integrated in less than two months, so the experiment was a simple design using readily available parts. The follow-on experiment needs to be more sophisticated and encompass more technologies. This paper lays out the considerations for the design and development of this follow-on flight memory experiment. It also details the results from the original Memory Test Experiment that flew on board FASTSAT. Some of the design considerations for the new experiment include the number and type of memory devices to be used, the kinds of tests that will be performed, other data needed to analyze the results, and best use of limited resources on a small satellite. The memory technologies that are considered are FRAM, FLASH, SONOS, Resistive Memory, Phase Change Memory, Nano-wire Memory, Magneto-resistive Memory, Standard DRAM, and Standard SRAM. The kinds of tests that could be performed are read/write operations, non-volatile memory retention, write cycle endurance, power measurements, and testing Error Detection and Correction schemes. Other data that may help analyze the results are GPS location of recorded errors, time stamp of all data recorded, radiation measurements, temperature, and other activities being perform by the satellite. The resources of power, volume, mass, temperature, processing power, and telemetry bandwidth are extremely limited on a small satellite. Design considerations must be made to allow the experiment to not interfere with the satellite s primary mission.
VPS GRCop-84 Liner Development Efforts
NASA Technical Reports Server (NTRS)
Elam, Sandra K.; Holmes, Richard; McKechnie, Tim; Hickman, Robert; Pickens, Tim
2003-01-01
For the past several years, NASA's Marshall Space Flight Center (MSFC) has been working with Plasma Processes, Inc. (PPI) to fabricate combustion chamber liners using the Vacuum Plasma Spray (VPS) process. Multiple liners of a variety of shapes and sizes have been created. Each liner has been fabricated with GRCop-84 (a copper alloy with chromium and niobium) and a functional gradient coating (FGC) on the hot wall. While the VPS process offers versatility and a reduced fabrication schedule, the material system created with VPS allows the liners to operate at higher temperatures, with maximum blanch resistance and improved cycle life. A subscal unit (5K lbf thrust class) is being cycle tested in a LOX/Hydrogen thrust chamber assembly at MSFC. To date, over 75 hot-fire tests have been accumulated on this article. Tests include conditions normally detrimental to conventional materials, yet the VPS GRCop-84 liner has yet to show any signs of degradation. A larger chamber (15K lbf thrust class) has also been fabricated and is being prepared for hot-fire testing at MSFC near the end of 2003. Linear liners have been successfully created to further demonstrate the versatility of the process. Finally, scale up issues for the VPS process are being tackled with efforts to fabricate a full size, engine class liner. Specifically, a liner for the SSME's Main Combustion Chamber (MCC) has recently been attempted. The SSME size was chosen for convenience, since its design was readily available and its size was sufficient to tackle specific issues. Efforts to fabricate these large liners have already provided valuable lessons for using this process for engine programs. The material quality for these large units is being evaluated with destructive analysis and these results will be available by the end of 2003.
Zheng, Zhongqing; Durbin, Thomas D; Xue, Jian; Johnson, Kent C; Li, Yang; Hu, Shaohua; Huai, Tao; Ayala, Alberto; Kittelson, David B; Jung, Heejung S
2014-01-01
It is important to understand the differences between emissions from standard laboratory testing cycles and those from actual on-road driving conditions, especially for solid particle number (SPN) emissions now being regulated in Europe. This study compared particle mass and SPN emissions from a heavy-duty diesel vehicle operating over the urban dynamometer driving schedule (UDDS) and actual on-road driving conditions. Particle mass emissions were calculated using the integrated particle size distribution (IPSD) method and called MIPSD. The MIPSD emissions for the UDDS and on-road tests were more than 6 times lower than the U.S. 2007 heavy-duty particulate matter (PM) mass standard. The MIPSD emissions for the UDDS fell between those for the on-road uphill and downhill driving. SPN and MIPSD measurements were dominated by nucleation particles for the UDDS and uphill driving and by accumulation mode particles for cruise and downhill driving. The SPN emissions were ∼ 3 times lower than the Euro 6 heavy-duty SPN limit for the UDDS and downhill driving and ∼ 4-5 times higher than the Euro 6 SPN limit for the more aggressive uphill driving; however, it is likely that most of the "solid" particles measured under these conditions were associated with a combination release of stored sulfates and enhanced sulfate formation associated with high exhaust temperatures, leading to growth of volatile particles into the solid particle counting range above 23 nm. Except for these conditions, a linear relationship was found between SPN and accumulation mode MIPSD. The coefficient of variation (COV) of SPN emissions of particles >23 nm ranged from 8 to 26% for the UDDS and on-road tests.
Afzal, Samina; Wherrett, Diane; Bartels, Ute; Tabori, Uri; Huang, Annie; Stephens, Derek; Bouffet, Eric
2010-05-01
Patients with intracranial germ cell tumor (IGCT) often present with pituitary dysfunction, including diabetes insipidus (DI). Recent protocols have used pre-radiation chemotherapy with combinations of etoposide, carboplatin and/or cisplatin, and ifosfamide. Management of DI in these patients requires monitoring of electrolytes and fluids during chemotherapy and hyperhydration. All consecutive patients treated with chemotherapy for an IGCT during the period 1990-2007 at the Hospital for Sick Children, Toronto were reviewed. Out of 32 patients who received chemotherapy, 21 had DI. Only cycles containing cisplatin and/or ifosfamide and hyperhydration were considered. DI and non-DI patients were compared for each cycle of chemotherapy. Patients were studied for number of days in hospital per chemotherapy course, daily fluid input and output, changes in dose, schedule and route of administration of desmopressin (DDAVP) during chemotherapy, daily variations in sodium level, electrolyte monitoring requirements per day, and complications related to fluid and electrolyte disturbances. Fifty-four cycles of chemotherapy in DI patients were compared to 25 cycles in non DI patients. All 21 patients with DI required daily change in dosage and schedule of DDAVP. Marked variations in daily sodium level were observed in the DI group. Seventeen courses required prolonged admission in the DI group (one in non DI patients) and 6 patients experienced serious complications. In conclusion, DI is a risk factor for complications when cisplatin and/or ifosfamide based protocols are used. The role of these agents in the management of ICGT should be carefully evaluated and guidelines for management of DI established.
Game injuries in relation to game schedules in the National Basketball Association.
Teramoto, Masaru; Cross, Chad L; Cushman, Daniel M; Maak, Travis G; Petron, David J; Willick, Stuart E
2017-03-01
Injury management is critical in the National Basketball Association (NBA), as players experience a wide variety of injuries. Recently, it has been suggested that game schedules, such as back-to-back games and four games in five days, increase the risk of injuries in the NBA. The aim of this study was to examine the association between game schedules and player injuries in the NBA. Descriptive epidemiology study. The present study analyzed game injuries and game schedules in the 2012-13 through 2014-15 regular seasons. Game injuries by game schedules and players' profiles were examined using an exact binomial test, the Fisher's exact test and the Mann-Whitney-Wilcoxon test. A Poisson regression analysis was performed to predict the number of game injuries sustained by each player from game schedules and injured players' profiles. There were a total of 681 cases of game injuries sustained by 280 different players during the three years (total N=1443 players). Playing back-to-back games or playing four games in five days alone was not associated with an increased rate of game injuries, whereas a significant positive association was found between game injuries and playing away from home (p<0.05). Playing back-to-back games and away games were significant predictors of frequent game injuries (p<0.05). Game schedules could be one factor that impacts the risk of game injuries in the NBA. The findings could be useful for designing optimal game schedules in the NBA as well as helping NBA teams make adjustments to minimize game injuries. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.
5 CFR 550.707 - Computation of severance pay fund.
Code of Federal Regulations, 2010 CFR
2010-01-01
... hours in the employee's basic work schedule (excluding overtime hours) varies during the year because of part-time work requirements, compute the weekly average of those hours and multiply that average by the... differential pay under 5 U.S.C. 5343(f) varies from week to week under a regularly recurring cycle of work...
Prolonged Cycle Times and Schedule Growth in Defense Acquisition: A Literature Review
2014-01-01
www.rand.org/pubs/monograph_reports/MR1362.html Blakeman, Seth T., Anthony R. Gibbs, and Jeyanthan Jeyasingam, Study of the Mine Resistant Ambush...Chad J. R. Ohlandt, Caroline Reilly, Rena Rudavsky, Jerry M. Sollinger, Katharine Watkins Webb, and Carolyn Wong, Root Cause Analyses of Nunn-McCurdy
Code of Federal Regulations, 2014 CFR
2014-07-01
... Conditioning/Heat Pump Equipment Domestic and commercial air conditioning and refrigeration equipment fall... cooling/heat cycle. 8415.82.00 Other, incorporating a refrigerating unit— Self-contained machines and... refrigerating or freezing equipment, electric or other; heat pumps, other than air conditioning machines of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Conditioning/Heat Pump Equipment Domestic and commercial air conditioning and refrigeration equipment fall... cooling/heat cycle. 8415.82.00 Other, incorporating a refrigerating unit— Self-contained machines and... refrigerating or freezing equipment, electric or other; heat pumps, other than air conditioning machines of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Conditioning/Heat Pump Equipment Domestic and commercial air conditioning and refrigeration equipment fall... cooling/heat cycle. 8415.82.00 Other, incorporating a refrigerating unit— Self-contained machines and... refrigerating or freezing equipment, electric or other; heat pumps, other than air conditioning machines of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Conditioning/Heat Pump Equipment Domestic and commercial air conditioning and refrigeration equipment fall... cooling/heat cycle. 8415.82.00 Other, incorporating a refrigerating unit— Self-contained machines and... refrigerating or freezing equipment, electric or other; heat pumps, other than air conditioning machines of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Conditioning/Heat Pump Equipment Domestic and commercial air conditioning and refrigeration equipment fall... cooling/heat cycle. 8415.82.00 Other, incorporating a refrigerating unit— Self-contained machines and... refrigerating or freezing equipment, electric or other; heat pumps, other than air conditioning machines of...
ERIC Educational Resources Information Center
Peterson, Megan J.; Snyder, W. Kalani; Westerman, Shelley; McFarland, Benjamin J.
2011-01-01
We describe how to produce and purify proteins from "Escherichia coli" inclusion bodies by adapting versatile, preparative-scale techniques to the undergraduate laboratory schedule. This 7-week sequence of experiments fits into an annual cycle of research activity in biochemistry courses. Recombinant proteins are expressed as inclusion bodies,…
Drullinsky, Pamela; Sugarman, Steven M; Fornier, Monica N; D'Andrea, Gabriella; Gilewski, Teresa; Lake, Diana; Traina, Tiffany; Wasserheit-Lieblich, Carolyn; Sklarin, Nancy; Atieh-Graham, Deena; Mills, Nancy; Troso-Sandoval, Tiffany; Seidman, Andrew D; Yuan, Jeffrey; Patel, Hamangi; Patil, Sujata; Norton, Larry; Hudis, Clifford
2010-12-01
Cyclophosphamide/methotrexate/fluorouracil (CMF) is a proven adjuvant option for patients with early-stage breast cancer. Randomized trials with other regimens demonstrate that dose-dense (DD) scheduling can offer greater efficacy. We investigated the feasibility of administering CMF using a DD schedule. Thirty-eight patients with early-stage breast cancer were accrued from March 2008 through June 2008. They were treated every 14 days with C 600, M 40, F 600 (all mg/m2) with PEG-filgrastim (Neulasta®) support on day 2 of each cycle. The primary endpoint was tolerability using a Simon's 2-stage optimal design. The design would effectively discriminate between true tolerability (as protocol-defined) rates of ≤ 60% and ≥ 80%. The median age was 52-years-old (range, 38-78 years of age). Twenty-nine of the 38 patients completed 8 cycles of CMF at 14-day intervals. Dose-dense adjuvant CMF is tolerable and feasible at 14-day intervals with PEG-filgrastim support.
NASA Technical Reports Server (NTRS)
Wyatt, J. K.; Ritz-De Cecco, A.; Czeisler, C. A.; Dijk, D. J.
1999-01-01
The interaction of homeostatic and circadian processes in the regulation of waking neurobehavioral functions and sleep was studied in six healthy young subjects. Subjects were scheduled to 15-24 repetitions of a 20-h rest/activity cycle, resulting in desynchrony between the sleep-wake cycle and the circadian rhythms of body temperature and melatonin. The circadian components of cognitive throughput, short-term memory, alertness, psychomotor vigilance, and sleep disruption were at peak levels near the temperature maximum, shortly before melatonin secretion onset. These measures exhibited their circadian nadir at or shortly after the temperature minimum, which in turn was shortly after the melatonin maximum. Neurobehavioral measures showed impairment toward the end of the 13-h 20-min scheduled wake episodes. This wake-dependent deterioration of neurobehavioral functions can be offset by the circadian drive for wakefulness, which peaks in the latter half of the habitual waking day during entrainment. The data demonstrate the exquisite sensitivity of many neurobehavioral functions to circadian phase and the accumulation of homeostatic drive for sleep.
Dynamic Modeling of Solar Dynamic Components and Systems
NASA Technical Reports Server (NTRS)
Hochstein, John I.; Korakianitis, T.
1992-01-01
The purpose of this grant was to support NASA in modeling efforts to predict the transient dynamic and thermodynamic response of the space station solar dynamic power generation system. In order to meet the initial schedule requirement of providing results in time to support installation of the system as part of the initial phase of space station, early efforts were executed with alacrity and often in parallel. Initially, methods to predict the transient response of a Rankine as well as a Brayton cycle were developed. Review of preliminary design concepts led NASA to select a regenerative gas-turbine cycle using a helium-xenon mixture as the working fluid and, from that point forward, the modeling effort focused exclusively on that system. Although initial project planning called for a three year period of performance, revised NASA schedules moved system installation to later and later phases of station deployment. Eventually, NASA selected to halt development of the solar dynamic power generation system for space station and to reduce support for this project to two-thirds of the original level.
Solar Effects of Low-Earth Orbit objects in ORDEM 3.0
NASA Technical Reports Server (NTRS)
Vavrin, A. B.; Anz-Meador, P.; Kelley, R. L.
2014-01-01
Variances in atmospheric density are directly related to the variances in solar flux intensity between 11- year solar cycles. The Orbital Debris Engineering Model (ORDEM 3.0) uses a solar flux table as input for calculating orbital lifetime of intact and debris objects in Low-Earth Orbit. Long term projections in solar flux activity developed by the NASA Orbital Debris Program Office (ODPO) extend the National Oceanic and Atmospheric Administration Space Environment Center (NOAA/SEC) daily historical flux values with a 5-year projection. For purposes of programmatic scheduling, the Q2 2009 solar flux table was chosen for ORDEM 3.0. Current solar flux activity shows that the current solar cycle has entered a period of lower solar flux intensity than previously forecasted in 2009. This results in a deviation of the true orbital debris environment propagation in ORDEM 3.0. In this paper, we present updated orbital debris populations in LEO using the latest solar flux values. We discuss the effects on recent breakup events such as the FY-1C anti-satellite test and the Iridium 33 / Cosmos 2251 accidental collision. Justifications for chosen solar flux tables are discussed.
TreeMAC: Localized TDMA MAC protocol for real-time high-data-rate sensor networks
Song, W.-Z.; Huang, R.; Shirazi, B.; Husent, R.L.
2009-01-01
Earlier sensor network MAC protocols focus on energy conservation in low-duty cycle applications, while some recent applications involve real-time high-data-rate signals. This motivates us to design an innovative localized TDMA MAC protocol to achieve high throughput and low congestion in data collection sensor networks, besides energy conservation. TreeMAC divides a time cycle into frames and frame into slots. Parent determines children's frame assigmnent based on their relative bandwidth demand, and each node calculates its own slot assignment based on its hop-count to the sink. This innovative 2-dimensional frame-slot assignment algorithm has the following nice theory properties. Firstly, given any node, at any time slot, there is at most one active sender in its neighborhood (includ ing itself). Secondly, the packet scheduling with TreelMAC is bufferless, which therefore minimizes the probability of network congestion. Thirdly, the data throughput to gateway is at least 1/3 of the optimum assuming reliable links. Our experiments on a 24 node test bed demonstrate that TreeMAC protocol significantly improves network throughput and energy efficiency, by comparing to the TinyOS's default CSMA MAC protocol and a recent TDMA MAC protocol Funneling-MAC[8]. ?? 2009 IEEE.
Intermittent and Flexible Work Schedules and Welfare Mothers' Employment. Phase 2.
ERIC Educational Resources Information Center
Franklin, David S.
The project worked closely and supportively with California welfare mothers, helping them find suitable employment which meshed with their parenting functions, to demonstrate and test the impact of flexible work schedules and to determine whether business and industry could provide flexibly scheduled work (part-time, temporary, or intermittent).…
DOT National Transportation Integrated Search
1995-12-01
A 10-hour, 4-day rotating shift schedule worked by some Air Traffic Control Specialists (ATCSs) was compared to the more traditional 8-hour, 2-2-1 rapidly rotating schedule. Measures of performance and alertness were obtained from a group of 52 ATCSs...
Asymmetry of Reinforcement and Punishment in Human Choice
ERIC Educational Resources Information Center
Rasmussen, Erin B.; Newland, M. Christopher
2008-01-01
The hypothesis that a penny lost is valued more highly than a penny earned was tested in human choice. Five participants clicked a computer mouse under concurrent variable-interval schedules of monetary reinforcement. In the no-punishment condition, the schedules arranged monetary gain. In the punishment conditions, a schedule of monetary loss was…
Shattuck, Nita Lewis; Matsangas, Panagiotis
2016-05-01
We assessed sleep patterns, psychomotor vigilance performance, work demands and mood of 77 crewmembers of USS NIMITZ (CVN-68) on the rotating 5-h on/10-h off (5/10) watchstanding schedule. Within the 3-day cycle of the 5/10, sleep occurred at distinctly different times each day. On two of these days, sailors typically received only brief, 4-h sleep episodes followed by periods of sustained wakefulness (approximately 22 and 20 h). Crewmembers received approximately seven hours of sleep daily, but reported excessive fatigue and dissatisfaction with their schedule. Crewmembers' mood worsened significantly over the course of the underway phase. Psychomotor vigilance performance (reaction times, lapses) was significantly degraded compared to performance when working circadian-aligned schedules. Overall, standing watch on the 5/10 schedule, combined with other work duties, resulted in poor sleep hygiene. Crewmembers on the 5/10 experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep. Practitioner summary: We assessed crewmembers' sleep patterns, psychomotor vigilance performance and work demands when working a rotating 5-h on/10-h off (5/10) watchstanding schedule. The 5/10, combined with other work duties, resulted in poor sleep hygiene. Crewmembers experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep.
Iwamoto, Kana; Ishihara, Hiroki; Takagi, Toshio; Kondo, Tsunenori; Yoshida, Kazuhiko; Iizuka, Junpei; Tanabe, Kazunari
2018-04-23
Sunitinib treatment with a 2-week-on/1-week-off schedule (Schedule 2/1) is a common alternative regimen with high relative dose intensity (RDI) and superior tolerability for patients with metastatic renal cell carcinoma (mRCC). The prognostic impact of RDI is reported only in 4-week-on/2-week-off or mixed regimens. Herein, we evaluated the prognostic impact of RDI during early-phase sunitinib treatment using Schedule 2/1. Seventy-four patients who received first-line sunitinib treatment using Schedule 2/1 were evaluated. Endpoints were progression-free survival (PFS) and overall survival (OS). We assessed RDI within the initial two cycles (2c-RDI), and its prognostic impact. Predictive factors for 2c-RDI deterioration were also evaluated. The cut-off value of 2c-RDI was set at 65%. Based on this cut-off, 31 patients (42.0%) were classified into the low 2c-RDI group (< 65%). PFS and OS were significantly shorter in the low-2c-RDI patients, compared with the high 2c-RDI patients (median PFS: 6.15 vs. 18.4 months, p = 0.0005; OS 11.0 vs. 39.3 months, p = 0.0002). Furthermore, multivariate analyses showed that the development of dose-limiting toxicities (DLTs) within the initial two cycles, as well as low initial dose, were independent factors for low 2c-RDI (DLTs: OR 18.6, 95% CI 3.27-105.30, p = 0.0010; initial dose: OR 9.26, 95% CI 1.42-60.40, p = 0.020). The most common adverse event was thrombocytopenia (any grade: 24.3%; grade ≥ 3: 8.1%). More than 65% of 2c-RDI should be maintained for optimal therapeutic effect of sunitinib treatment using Schedule 2/1. To achieve the appropriate 2c-RDI, careful follow-up for patient tolerability is needed to avoid early DLT development.
Dim light at night disturbs the daily sleep-wake cycle in the rat.
Stenvers, Dirk Jan; van Dorp, Rick; Foppen, Ewout; Mendoza, Jorge; Opperhuizen, Anne-Loes; Fliers, Eric; Bisschop, Peter H; Meijer, Johanna H; Kalsbeek, Andries; Deboer, Tom
2016-10-20
Exposure to light at night (LAN) is associated with insomnia in humans. Light provides the main input to the master clock in the hypothalamic suprachiasmatic nucleus (SCN) that coordinates the sleep-wake cycle. We aimed to develop a rodent model for the effects of LAN on sleep. Therefore, we exposed male Wistar rats to either a 12 h light (150-200lux):12 h dark (LD) schedule or a 12 h light (150-200 lux):12 h dim white light (5 lux) (LDim) schedule. LDim acutely decreased the amplitude of daily rhythms of REM and NREM sleep, with a further decrease over the following days. LDim diminished the rhythms of 1) the circadian 16-19 Hz frequency domain within the NREM sleep EEG, and 2) SCN clock gene expression. LDim also induced internal desynchronization in locomotor activity by introducing a free running rhythm with a period of ~25 h next to the entrained 24 h rhythm. LDim did not affect body weight or glucose tolerance. In conclusion, we introduce the first rodent model for disturbed circadian control of sleep due to LAN. We show that internal desynchronization is possible in a 24 h L:D cycle which suggests that a similar desynchronization may explain the association between LAN and human insomnia.
Dim light at night disturbs the daily sleep-wake cycle in the rat
Jan Stenvers, Dirk; van Dorp, Rick; Foppen, Ewout; Mendoza, Jorge; Opperhuizen, Anne-Loes; Fliers, Eric; Bisschop, Peter H.; Meijer, Johanna H.; Kalsbeek, Andries; Deboer, Tom
2016-01-01
Exposure to light at night (LAN) is associated with insomnia in humans. Light provides the main input to the master clock in the hypothalamic suprachiasmatic nucleus (SCN) that coordinates the sleep-wake cycle. We aimed to develop a rodent model for the effects of LAN on sleep. Therefore, we exposed male Wistar rats to either a 12 h light (150–200lux):12 h dark (LD) schedule or a 12 h light (150–200 lux):12 h dim white light (5 lux) (LDim) schedule. LDim acutely decreased the amplitude of daily rhythms of REM and NREM sleep, with a further decrease over the following days. LDim diminished the rhythms of 1) the circadian 16–19 Hz frequency domain within the NREM sleep EEG, and 2) SCN clock gene expression. LDim also induced internal desynchronization in locomotor activity by introducing a free running rhythm with a period of ~25 h next to the entrained 24 h rhythm. LDim did not affect body weight or glucose tolerance. In conclusion, we introduce the first rodent model for disturbed circadian control of sleep due to LAN. We show that internal desynchronization is possible in a 24 h L:D cycle which suggests that a similar desynchronization may explain the association between LAN and human insomnia. PMID:27762290
A real-time Excel-based scheduling solution for nursing staff reallocation.
Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna
2016-09-30
Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.
Bicard, David E; Neef, Nancy A
2002-01-01
This study examined the effects of two types of instructions on the academic responding of 4 children with attention deficit hyperactivity disorder. Tactical instructions specified how to distribute responding between two concurrently available sets of math problems associated with different variable-interval schedules of reinforcement. Strategic instructions provided a strategy to determine the best way to distribute responding. Instruction conditions were counterbalanced in an ABAB/BABA reversal design nested within a multiple baseline across participants design. Experimental sessions consisted of a learning session in which participants were provided with one type of instruction, followed by a test session in which no instruction was provided. The schedules of reinforcement were subsequently reversed during test sessions. When learning and test schedules were identical, the responding of all 4 participants closely matched the reinforcement schedules. When tactical instructions were provided and schedules were subsequently changed, responding often remained under the control of the instructions. When strategic instructions were provided, responding more quickly adapted to the changed contingencies. Analysis of postsession verbal reports indicated correspondence between the participants' verbal descriptions (whether accurate or inaccurate) and their nonverbal patterns of responding.
Signals, resistance to change, and conditioned reinforcement in a multiple schedule.
Bell, Matthew C; Gomez, Belen E; Kessler, Kira
2008-06-01
The effect of signals on resistance to change was evaluated using pigeons responding on a three-component multiple schedule. Each component contained a variable-interval initial link followed by a fixed-time terminal link. One component was an unsignaled-delay schedule, and two were equivalent signaled-delay schedules. After baseline training, resistance to change was assessed through (a) extinction and (b) adding free food to the intercomponent interval. During these tests, the signal stimulus from one of the signaled-delay components (SIG-T) was replaced with the initial-link stimulus from that component, converting it to an unsignaled-delay schedule. That signal stimulus was added to the delay period of the unsignaled-delay component (UNS), converting it to a signaled-delay schedule. The remaining signaled component remained unchanged (SIG-C). Resistance-to-change tests showed removing the signal had a minimal effect on resistance to change in the SIG-T component compared to the unchanged SIG-C component except for one block during free-food testing. Adding the signal to the UNS component significantly increased response rates suggesting that component had low response strength. Interestingly, the direction of the effect was in the opposite direction from what is typically observed. Results are consistent with the conclusion that the signal functioned as a conditioned reinforcer and inconsistent with a generalization-decrement explanation.
Dijk, Derk-Jan; Duffy, Jeanne F.; Silva, Edward J.; Shanahan, Theresa L.; Boivin, Diane B.; Czeisler, Charles A.
2012-01-01
Background The phase and amplitude of rhythms in physiology and behavior are generated by circadian oscillators and entrained to the 24-h day by exposure to the light-dark cycle and feedback from the sleep-wake cycle. The extent to which the phase and amplitude of multiple rhythms are similarly affected during altered timing of light exposure and the sleep-wake cycle has not been fully characterized. Methodology/Principal Findings We assessed the phase and amplitude of the rhythms of melatonin, core body temperature, cortisol, alertness, performance and sleep after a perturbation of entrainment by a gradual advance of the sleep-wake schedule (10 h in 5 days) and associated light-dark cycle in 14 healthy men. The light-dark cycle consisted either of moderate intensity ‘room’ light (∼90–150 lux) or moderate light supplemented with bright light (∼10,000 lux) for 5 to 8 hours following sleep. After the advance of the sleep-wake schedule in moderate light, no significant advance of the melatonin rhythm was observed whereas, after bright light supplementation the phase advance was 8.1 h (SEM 0.7 h). Individual differences in phase shifts correlated across variables. The amplitude of the melatonin rhythm assessed under constant conditions was reduced after moderate light by 54% (17–94%) and after bright light by 52% (range 12–84%), as compared to the amplitude at baseline in the presence of a sleep-wake cycle. Individual differences in amplitude reduction of the melatonin rhythm correlated with the amplitude of body temperature, cortisol and alertness. Conclusions/Significance Alterations in the timing of the sleep-wake cycle and associated bright or moderate light exposure can lead to changes in phase and reduction of circadian amplitude which are consistent across multiple variables but differ between individuals. These data have implications for our understanding of circadian organization and the negative health outcomes associated with shift-work, jet-lag and exposure to artificial light. PMID:22363414
NASA Astrophysics Data System (ADS)
Arons-Polan, Bonnie
This study examined the effect of three schedule types on student achievement in Advanced Placement Biology classes. AP Biology test scores from students on three types of full-year schedules were analyzed to assess the impact schedule type had on student achievement. The three schedules included the block and traditional schedules, and the rotating/hybrid, a blend of the former two schedules. The results indicated the variable most closely associated with success on the AP Biology exam was the length of experience the teachers had teaching the course, regardless of schedule type. Although significant differences were seen in mean AP Biology test scores among the three schedule types, this could be explained by the relationship between instructors' experience and schedule type. Regression analysis determined the two strongest predictors of successful performance on the AP Biology exam were instructors' experience and perceived teaching style, regardless of schedule type. It appears that the economically developed suburbs, had teachers with the largest amount of experience teaching AP Biology, and these teachers reported using a direct approach to teaching, using lecture greater than 50% of the time. The results of this study also suggest when restructuring to improve student achievement, educators should examine other variables in addition to the high school schedule. Restructuring the day to allow for longer classes must be accompanied by professional staff development to allow teachers to develop new teaching methods. Most of the teachers in the survey reported using lecture a great deal of the time, regardless of schedule type. Comments from the teachers from the various schedules revealed that the ability to add student centered, inquiry based activities and labs were dependent on adequate class time. No information on whether or not the teachers were given professional development to expand their repertoire of teaching methods when the school adopted a block or rotating hybrid schedule was obtained. Limitations to this study include the fact that there was no independent verification of teaching style as reported by the teachers in this study. This study involved only Advanced Placement Biology classes, so no generalizations can be made to other science classes.
Jorgensen, Rachael; Arathi, H S
2013-09-01
A plant investing in reproduction partitions resources between flowering and seed production. Under resource limitation, altered allocations may result in floral trait variations, leading to compromised fecundity. Floral longevity and timing of selfing are often the traits most likely to be affected. The duration of corolla retention determines whether fecundity results from outcrossing or by delayed selfing-mediated reproductive assurance. In this study, the role of pollination schedules and soil water availability on floral longevity and seed production is tested in Collinsia heterophylla (Plantaginaceae). Using three different watering regimes and pollination schedules, effects on floral longevity and seed production were studied in this protandrous, flowering annual. The results reveal that soil water status and pollination together influence floral longevity with low soil water and hand-pollinations early in the floral lifespan reducing longevity. However, early pollinations under excess water did not extend longevity, implying that resource surplus does not lengthen the outcrossing period. The results also indicate that pollen receipt, a reliable cue for fecundity, accelerates flower drop. Early corolla abscission under drought stress could potentially exacerbate sexual conflict in this protandrous, hermaphroditic species by ensuring self-pollen paternity and enabling male control of floral longevity. While pollination schedules did not affect fecundity, water stress reduced per-capita seed numbers. Unmanipulated flowers underwent delayed autonomous selfing, producing very few seeds, suggesting that inbreeding depression may limit benefits of selfing. In plants where herkogamy and dichogamy facilitate outcrossing, floral longevity determines reproductive success and mating system. Reduction in longevity under drought suggests a strong environmental effect that could potentially alter the preferred breeding mode in this mixed-mated species. Extrapolating the findings to unpredictable global drought cycles, it is suggested that in addition to reducing yield, water stress may influence the evolutionary trajectory of plant mating system.
Simulated Night Shift Disrupts Circadian Rhythms of Immune Functions in Humans.
Cuesta, Marc; Boudreau, Philippe; Dubeau-Laramée, Geneviève; Cermakian, Nicolas; Boivin, Diane B
2016-03-15
Recent research unveiled a circadian regulation of the immune system in rodents, yet little is known about rhythms of immune functions in humans and how they are affected by circadian disruption. In this study, we assessed rhythms of cytokine secretion by immune cells and tested their response to simulated night shifts. PBMCs were collected from nine participants kept in constant posture over 24 h under a day-oriented schedule (baseline) and after 3 d under a night-oriented schedule. Monocytes and T lymphocytes were stimulated with LPS and PHA, respectively. At baseline, a bimodal rhythmic secretion was detected for IL-1β, IL-6, and TNF-α: a night peak was primarily due to a higher responsiveness of monocytes, and a day peak was partly due to a higher proportion of monocytes. A rhythmic release was also observed for IL-2 and IFN-γ, with a nighttime peak due to a higher cell count and responsiveness of T lymphocytes. Following night shifts, with the exception of IL-2, cytokine secretion was still rhythmic but with peak levels phase advanced by 4.5-6 h, whereas the rhythm in monocyte and T lymphocyte numbers was not shifted. This suggests distinct mechanisms of regulation between responsiveness to stimuli and cell numbers of the human immune system. Under a night-oriented schedule, only cytokine release was partly shifted in response to the change in the sleep-wake cycle. This led to a desynchronization of rhythmic immune parameters, which might contribute to the increased risk for infection, autoimmune diseases, cardiovascular and metabolic disorders, and cancer reported in shift workers. Copyright © 2016 by The American Association of Immunologists, Inc.
Cash transportation vehicle routing and scheduling under stochastic travel times
NASA Astrophysics Data System (ADS)
Yan, Shangyao; Wang, Sin-Siang; Chang, Yu-Hsuan
2014-03-01
Stochastic disturbances occurring in real-world operations could have a significant influence on the planned routing and scheduling results of cash transportation vehicles. In this study, a time-space network flow technique is utilized to construct a cash transportation vehicle routing and scheduling model incorporating stochastic travel times. In addition, to help security carriers to formulate more flexible routes and schedules, a concept of the similarity of time and space for vehicle routing and scheduling is incorporated into the model. The test results show that the model could be useful for security carriers in actual practice.
Kullberg, Anna; Bergenmar, Mia; Sharp, Lena
2016-05-01
To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.
Visual Schedule System in Dental Care for Patients with Autism: A Pilot Study.
Mah, Janet Wt; Tsang, Phoebe
A pilot study to test whether a visual schedule system using picture communication symbols can help children with autism have successful routine dental cleaning visits. 14 boys with autism between three- to eight-years-old presented to the dental clinic for four weekly consecutive dental appointments. Patients were randomly assigned to either the control group who received the tell-show-do method (i.e., standard of care), or the test group who received the tell-show-do method plus the visual schedule system. Patients in the test group completed an average of 1.38 more steps, at 35.52 seconds per step faster, and with 18.7% lower levels of behavioral distress than those in the control group. The use of a visual schedule system, along with repeated weekly visits, showed some promise in helping children with autism successfully complete more steps, progress at a quicker rate, and exhibit lower levels of behavioral distress within a dental appointment, compared to a traditional tell-show-do approach.
Regularity in the control of the free-running sleep-wakefulness rhythm
NASA Technical Reports Server (NTRS)
Webb, W. B.; Agnew, H. W., Jr.
1974-01-01
In the present experiment, rigid control over the sleep and wake-up times was employed in an attempt to contain the natural rhythm to a 24-hr cycle. Eight subjects were isolated from all time and social cues for 10 days. They were placed on a rigid schedule of sleep between 11 p.m. and 7 a.m. The results indicate that, for practical purposes, the free-running sleep-wakefulness rhythm can be contained to a 24-hr cycle by rigid control of the sleep portion of the cycle. When part of the control was released by allowing the subjects to sleep beyond 7 a.m., they slept an average of 67 min longer and showed sleep latencies which averaged 73 min. From these data it is concluded that control of the sleep portion of the sleep-wakefulness cycle, particularly control of the wake-up time, is sufficient to contain the free-running sleep-wakefulness rhythm to a 24-hr cycle.
Short, Michelle A; Agostini, Alexandra; Lushington, Kurt; Dorrian, Jillian
2015-09-01
The aim of this review was to identify which limited wake shift work schedules (LWSW) best promote sleep, alertness, and performance. LWSW are fixed work/rest cycles where the time-at-work does is ≤8 hours and there is >1 rest period per day, on average, for ≥2 consecutive days. These schedules are commonly used in safety-critical industries such as transport and maritime industries. Literature was sourced using PubMed, Embase, PsycInfo, Scopus, and Google Scholar databases. We identified 20 independent studies (plus a further 2 overlapping studies), including 5 laboratory and 17 field-based studies focused on maritime watch keepers, ship bridge officers, and long-haul train drivers. The measurement of outcome measures was varied, incorporating subjective and objective measures of sleep: sleep diaries (N=5), actigraphy (N=4), and polysomnography, (N=3); sleepiness: Karolinska Sleepiness Scale (N=5), visual analog scale (VAS) alertness (N=2) and author-derived measures (N=2); and performance: Psychomotor Vigilance Test (PVT) (N=5), Reaction Time or Vigilance tasks (N=4), Vector and Letter Cancellation Test (N=1), and subjective performance (N=2). Of the three primary rosters examined (6 hours-on/6 hours-off, 8 hours-on/8 hours-off and 4 hours-on/8 hours-off), the 4 hours-on/8 hours-off roster was associated with better sleep and lower levels of sleepiness. Individuals working 4 hours-on/8 hours-off rosters averaged 1 hour more sleep per night than those working 6 hours-on/6 hours-off and 1.3 hours more sleep than those working 8 hours-on/8 hours-off (P<0.01). More broadly, findings indicate that LWSW schedules were associated with better sleep and lower sleepines in the case of (i) shorter time-at-work, (ii) more frequent rest breaks, (iii) shifts that start and end at the same clock time every 24 hours, and (iv) work shifts commencing in the daytime (as opposed to night). The findings for performance remain incomplete due to the small number of studies containing a performance measure and the heterogeneity of performance measures within those that did. The literature supports the utility of LWSW in industries where individuals sleep at or near the workplace as they facilitate at least some sleep during the biological night and minimize deficits associated with time-on-shift with shorter shifts. Overall, the 4 hour-on/8 hour-off roster best promoted sleep and minimized sleepiness compared to other LWSW schedules. Nevertheless, and considering the safety-critical nature of industries which employ LWSW, the limited literature needs to be greatly expanded with specific focus on the consequences for performance and comparison to mainstream rosters.
Flight evaluation of the DEEC secondary control air-start capability
NASA Technical Reports Server (NTRS)
Johnson, J. B.; Nelson, J.
1983-01-01
The air-start capability of a secondary engine control (SEC) was tested for a DEEC-equipped F100 engine and installed in an F-15 airplane. Two air-start schedules were tested. The first was referred to as the group I schedule; the second or revised schedule was the group II start schedule. Using the group I start schedule, an airspeed of 300 knots was required to ensure successful 40- and 25-percent SEC-mode air starts. If N2 were less than 40 percent, a stall would occur when the start bleeds closed 40 sec after initiation of the air start. All JFS-assisted air starts were successful with the group start schedule. For the group II schedule, the time between pressurization and start-bleed closure ranged between 50 and 72 sec depending on altitude. All air starts were successful above 225 knots givin a 75-knot reduction in required airspeed for a successful air start. Spooldown air starts of 40 percent were successful at 200 knots at altitudes up to 10,650 m and at 175 knots at altitudes up to 6100 m. Idle rpm was lower than the desired 65 percent for air starts at higher altitudes and lower airspeeds. All JSF-assisted air starts were successful.
Further Examination of the Reliability of the Modified Rathus Assertiveness Schedule.
ERIC Educational Resources Information Center
Del Greco, Linda; And Others
1986-01-01
Examined the reliability of the 30-item Modified Rathus Assertiveness Schedule (MRAS) using the test-retest method over a three-week period. The MRAS yielded correlations of .74 using the Pearson product and Spearman Brown correlation coefficient. Correlations for males yielded .77 and .72. For females correlations for both tests were .72.…
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Schedule C-prototype tests for calibration or reference sources containing americium-241 or radium-226. 32.102 Section 32.102 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL Generally...
20 CFR 220.52 - Failure to appear at a consultative examination.
Code of Federal Regulations, 2010 CFR
2010-04-01
... not have good reason for failing or refusing to take part in a consultative examination or test which... good reason for failure to appear, another examination or test will be scheduled. (b) Examples of good reasons for failure to appear. Some examples of good reasons for not going to a scheduled examination or...
Space network scheduling benchmark: A proof-of-concept process for technology transfer
NASA Technical Reports Server (NTRS)
Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy
1993-01-01
This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.
Compositional schedulability analysis of real-time actor-based systems.
Jaghoori, Mohammad Mahdi; de Boer, Frank; Longuet, Delphine; Chothia, Tom; Sirjani, Marjan
2017-01-01
We present an extension of the actor model with real-time, including deadlines associated with messages, and explicit application-level scheduling policies, e.g.,"earliest deadline first" which can be associated with individual actors. Schedulability analysis in this setting amounts to checking whether, given a scheduling policy for each actor, every task is processed within its designated deadline. To check schedulability, we introduce a compositional automata-theoretic approach, based on maximal use of model checking combined with testing. Behavioral interfaces define what an actor expects from the environment, and the deadlines for messages given these assumptions. We use model checking to verify that actors match their behavioral interfaces. We extend timed automata refinement with the notion of deadlines and use it to define compatibility of actor environments with the behavioral interfaces. Model checking of compatibility is computationally hard, so we propose a special testing process. We show that the analyses are decidable and automate the process using the Uppaal model checker.
NASA Technical Reports Server (NTRS)
Withey, James V.
1986-01-01
The validity of real-time software is determined by its ability to execute on a computer within the time constraints of the physical system it is modeling. In many applications the time constraints are so critical that the details of process scheduling are elevated to the requirements analysis phase of the software development cycle. It is not uncommon to find specifications for a real-time cyclic executive program included to assumed in such requirements. It was found that prelininary designs structured around this implementation abscure the data flow of the real world system that is modeled and that it is consequently difficult and costly to maintain, update and reuse the resulting software. A cyclic executive is a software component that schedules and implicitly synchronizes the real-time software through periodic and repetitive subroutine calls. Therefore a design method is sought that allows the deferral of process scheduling to the later stages of design. The appropriate scheduling paradigm must be chosen given the performance constraints, the largest environment and the software's lifecycle. The concept of process inversion is explored with respect to the cyclic executive.
2015-05-28
Diver Characteristics Appendix E Diving Schedule Appendix F Medical Incidents Appendix G UBA Gas Compositions iv ACKNOWLEDGEMENTS The...experimental dives (median = 3). The schedule of each diver’s participation in experimental dives is given in Appendix E . Divers were required to avoid any...divers’ participation on each test schedule is given in Appendix E . The numbers of completed man-dives on the two schedules are not multiples of the
Vehicle Test Procedure Driving Schedules
DOT National Transportation Integrated Search
1977-03-01
This report discusses the salient characteristics of driving schedules which are currently being used to determine automotive fuel economy, exhaust emissions, and component characteristics. The analyses discussed and the results reported highlight th...
Scheduling lessons learned from the Autonomous Power System
NASA Technical Reports Server (NTRS)
Ringer, Mark J.
1992-01-01
The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.
Space Station Systems Technology Study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1984-01-01
The four study areas addressed are: (1) attitude control, (2) data management, (3) long-life thermal management, and (4) automated housekeeping integration. The design concepts in each area were refined. The cost benefits, schedules, and life cycle costs for the options were evaluated. Technology advancement plans were prepared for each of the selected items, and documentation was prepared.
Project Helps High-Schoolers Shore up on Shut-Eye
ERIC Educational Resources Information Center
Brydolf, Carol
2011-01-01
It's not news to most parents of adolescents that teenagers' sleep cycles operate in an alternate universe. A growing body of research shows that American teenagers are so at odds with conventional work and school schedules that they suffer from sleep deficits serious enough to affect their moods, health, and academic performance. Yet the vast…
2002-09-01
abbreviations used are: P-gp, P-glycoprotein; MDR, multidrug re- Association of New York, Shoes on Sale/QVC. sistance; FB1 , fumonisin B1; SPT, serine...when Fumonisin B1, a ceramide synthase inhibitor, was ing on the integrity of their schedule-oriented cell cycle checkpoints; G2/M arrest added to
ERIC Educational Resources Information Center
Colorado State Dept. of Education, Denver.
Guidelines to help school district supervisors and business management personnel implement state-required financial policies and procedures are presented in this report. Steps to comply with Colorado regulations for budgeting, accounting, reporting, and auditing processes are discussed. Figures illustrate the budgeting cycle and schedule. (LMI)
Automated Estimation Of Software-Development Costs
NASA Technical Reports Server (NTRS)
Roush, George B.; Reini, William
1993-01-01
COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Medvec, M.D.; Rosen, V.
1995-12-31
In 1990, New York Power Authority (NYPA), was selected to provide 150 MW of electrical power to Long Island Lighting Company (LILCO), using a combined gas and steam turbine cycle. The gas turbine chosen was a Siemens V84.2 with a design ISO rating of 103 MW. NYPA, acting as an independent power producer, would build, operate and maintain the facility. The power plant would be dispatched by LILCO for a period of twenty years from the beginning of its commercial operation on May 1, 1994. The construction was completed in 20 months and the unit started commercial operation on schedule.more » The formal performance acceptance tests, conducted in June 1994, indicated a better net output power and a lower net heart rate than the guaranteed figures for operation with natural gas and light distillate as the backup fuel. Stack emissions compliance tests conducted in October 1995, successfully demonstrated NOx emissions of 9 ppmvd (15% O{sub 2}) for dry combustion of natural gas. In its first year of operation the plant achieved a rolling average equivalent availability rate (EAF) of 94.6%; NYPA`s target is 90.42% for a twenty year contract term. This article will review Siemens NOx abatement technology to obtain single digit emissions and describe the operational experience with the dry low NOx system at the Richard M. Flynn Power Plant.« less
Regazzi, M B; Russo, D; Iacona, I; Sacchi, S; Visani, G; Lazzarino, M; Avvisati, G; Pelicci, P G; Dastoli, G; Grandi, C; Spreafico, S; Grattoni, R; Galieni, P; Rupoli, S; Maiolo, A M; Guerra, E; Liberati, A M
1998-01-01
This study investigated the pharmacokinetics of tretinoin during alternating cycles of 1 week of tretinoin treatment and 1 week drug-free in patients with Ph1+ chronic myelogenous leukaemia (CML) in the chronic phase. Eighteen patients with CML were treated with tretinoin 80 mg/m(2)/day (in two divided doses) for 7 consecutive days every other week (one cycle = 1 week on/1 week off). Body systemic exposure to tretinoin as determined by the area under the plasma concentration-time curve (AUC) decreased significantly during the first week of drug administration, from (mean +/- SD) 678.3 +/- 498.1 to 258.7 +/- 272.4 microg/L.h. In about 40% of the patients the decline in plasma concentrations was >/=80%, while 17% of the population did not experience any decline. On day 7 of cycle 1, the mean apparent oral clearance (CL/F) was 2.6 times the corresponding value on day 1. After 1 week without tretinoin, the mean AUC on day 1 of cycle 2 was lower (down 15%) but not statistically different from the corresponding value observed on day 1 of cycle 1; 62% of patients showed an increase in the AUC, which was 40% higher than the corresponding value on day 7 of cycle 1. On day 1 of cycle 6, the AUC and CL/F of tretinoin during a dosage interval were not statistically different from those observed on day 1 of cycle 1 and cycle 2. On all occasions the peak plasma concentration (C(max)) was strongly correlated to the corresponding AUC. No significant change in the time to observed C(max) (t(max)) and in the elimination half-life (t((1/2))) was observed during the whole study. These results confirmed that the metabolism of tretinoin is rapidly up-regulated in CML patients, with significant declines in plasma drug exposure during the first week of drug administration. After tretinoin was discontinued, a return to the noninduced state followed a mean time-cycle similar to the induction. The strong decrease in the apparent oral drug clearance and the absence of significant variations in the drug half-life demonstrated that the presystemic extraction of tretinoin is the main cause of the marked decline in plasma drug exposure. The favourable pharmacokinetic profile of tretinoin obtained by an intermittent regimen, 1 week on/1 week off therapy (vs continuous administration), suggests that such a therapeutic schedule is the most appropriate for the assessment of clinical efficacy in those pathologies in which its use is suitable.
The Ames-Lockheed orbiter processing scheduling system
NASA Technical Reports Server (NTRS)
Zweben, Monte; Gargan, Robert
1991-01-01
A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.
Bankole, Temitayo; Jones, Dustin; Bhattacharyya, Debangsu; ...
2017-11-03
In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capturemore » and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.« less
Channel and Timeslot Co-Scheduling with Minimal Channel Switching for Data Aggregation in MWSNs
Yeoum, Sanggil; Kang, Byungseok; Lee, Jinkyu; Choo, Hyunseung
2017-01-01
Collision-free transmission and efficient data transfer between nodes can be achieved through a set of channels in multichannel wireless sensor networks (MWSNs). While using multiple channels, we have to carefully consider channel interference, channel and time slot (resources) optimization, channel switching delay, and energy consumption. Since sensor nodes operate on low battery power, the energy consumed in channel switching becomes an important challenge. In this paper, we propose channel and time slot scheduling for minimal channel switching in MWSNs, while achieving efficient and collision-free transmission between nodes. The proposed scheme constructs a duty-cycled tree while reducing the amount of channel switching. As a next step, collision-free time slots are assigned to every node based on the minimal data collection delay. The experimental results demonstrate that the validity of our scheme reduces the amount of channel switching by 17.5%, reduces energy consumption for channel switching by 28%, and reduces the schedule length by 46%, as compared to the existing schemes. PMID:28471416
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bankole, Temitayo; Jones, Dustin; Bhattacharyya, Debangsu
In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capturemore » and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.« less
Channel and Timeslot Co-Scheduling with Minimal Channel Switching for Data Aggregation in MWSNs.
Yeoum, Sanggil; Kang, Byungseok; Lee, Jinkyu; Choo, Hyunseung
2017-05-04
Collision-free transmission and efficient data transfer between nodes can be achieved through a set of channels in multichannel wireless sensor networks (MWSNs). While using multiple channels, we have to carefully consider channel interference, channel and time slot (resources) optimization, channel switching delay, and energy consumption. Since sensor nodes operate on low battery power, the energy consumed in channel switching becomes an important challenge. In this paper, we propose channel and time slot scheduling for minimal channel switching in MWSNs, while achieving efficient and collision-free transmission between nodes. The proposed scheme constructs a duty-cycled tree while reducing the amount of channel switching. As a next step, collision-free time slots are assigned to every node based on the minimal data collection delay. The experimental results demonstrate that the validity of our scheme reduces the amount of channel switching by 17.5%, reduces energy consumption for channel switching by 28%, and reduces the schedule length by 46%, as compared to the existing schemes.
ERIC Educational Resources Information Center
Grissom, Jason A.; Strunk, Katharine O.
2012-01-01
This study examines the relative distribution of salary schedule returns to experience for beginning and veteran teachers. We argue that districts are likely to benefit from structuring salary schedules with greater experience returns early in the teaching career. To test this hypothesis, we match salary data to school-level student performance…
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
NASA Technical Reports Server (NTRS)
Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte
1992-01-01
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.
NASA Technical Reports Server (NTRS)
Maynard, O. E.; Brown, W. C.; Edwards, A.; Haley, J. T.; Meltz, G.; Howell, J. M.; Nathan, A.
1975-01-01
The microwave rectifier technology, approaches to the receiving antenna, topology of rectenna circuits, assembly and construction, ROM cost estimates are discussed. Analyses and cost estimates for the equipment required to transmit the ground power to an external user. Noise and harmonic considerations are presented for both the amplitron and klystron and interference limits are identified and evaluated. The risk assessment discussion is discussed wherein technology risks are rated and ranked with regard to their importance in impacting the microwave power transmission system. The system analyses and evaluation are included of parametric studies of system relationships pertaining to geometry, materials, specific cost, specific weight, efficiency, converter packing, frequency selection, power distribution, power density, power output magnitude, power source, transportation and assembly. Capital costs per kW and energy costs as a function of rate of return, power source and transportation costs as well as build cycle time are presented. The critical technology and ground test program are discussed along with ROM costs and schedule. The orbital test program with associated critical technology and ground based program based on full implementation of the defined objectives is discussed.
Multiple quay cranes scheduling for double cycling in container terminals
Chu, Yanling; Zhang, Xiaoju; Yang, Zhongzhen
2017-01-01
Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in container terminals. In this paper, an optimization model for double cycling is developed to optimize the operation sequence of multiple QCs. The objective is to minimize the makespan of the ship handling operation considering the ship balance constraint. To solve the model, an algorithm based on Lagrangian relaxation is designed. Finally, we compare the efficiency of the Lagrangian relaxation based heuristic with the branch-and-bound method and a genetic algorithm using instances of different sizes. The results of numerical experiments indicate that the proposed model can effectively reduce the unloading and loading times of QCs. The effects of the ship balance constraint are more notable when the number of QCs is high. PMID:28692699
Multiple quay cranes scheduling for double cycling in container terminals.
Chu, Yanling; Zhang, Xiaoju; Yang, Zhongzhen
2017-01-01
Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in container terminals. In this paper, an optimization model for double cycling is developed to optimize the operation sequence of multiple QCs. The objective is to minimize the makespan of the ship handling operation considering the ship balance constraint. To solve the model, an algorithm based on Lagrangian relaxation is designed. Finally, we compare the efficiency of the Lagrangian relaxation based heuristic with the branch-and-bound method and a genetic algorithm using instances of different sizes. The results of numerical experiments indicate that the proposed model can effectively reduce the unloading and loading times of QCs. The effects of the ship balance constraint are more notable when the number of QCs is high.
Scheduling Earth Observing Satellites with Evolutionary Algorithms
NASA Technical Reports Server (NTRS)
Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna
2003-01-01
We hypothesize that evolutionary algorithms can effectively schedule coordinated fleets of Earth observing satellites. The constraints are complex and the bottlenecks are not well understood, a condition where evolutionary algorithms are often effective. This is, in part, because evolutionary algorithms require only that one can represent solutions, modify solutions, and evaluate solution fitness. To test the hypothesis we have developed a representative set of problems, produced optimization software (in Java) to solve them, and run experiments comparing techniques. This paper presents initial results of a comparison of several evolutionary and other optimization techniques; namely the genetic algorithm, simulated annealing, squeaky wheel optimization, and stochastic hill climbing. We also compare separate satellite vs. integrated scheduling of a two satellite constellation. While the results are not definitive, tests to date suggest that simulated annealing is the best search technique and integrated scheduling is superior.
Lu, Lingbo; Li, Jingshan; Gisler, Paula
2011-06-01
Radiology tests, such as MRI, CT-scan, X-ray and ultrasound, are cost intensive and insurance pre-approvals are necessary to get reimbursement. In some cases, tests may be denied for payments by insurance companies due to lack of pre-approvals, inaccurate or missing necessary information. This can lead to substantial revenue losses for the hospital. In this paper, we present a simulation study of a centralized scheduling process for outpatient radiology tests at a large community hospital (Central Baptist Hospital in Lexington, Kentucky). Based on analysis of the central scheduling process, a simulation model of information flow in the process has been developed. Using such a model, the root causes of financial losses associated with errors and omissions in this process were identified and analyzed, and their impacts were quantified. In addition, "what-if" analysis was conducted to identify potential process improvement strategies in the form of recommendations to the hospital leadership. Such a model provides a quantitative tool for continuous improvement and process control in radiology outpatient test scheduling process to reduce financial losses associated with process error. This method of analysis is also applicable to other departments in the hospital.
Temporal Organization of the Sleep-Wake Cycle under Food Entrainment in the Rat
Castro-Faúndez, Javiera; Díaz, Javier; Ocampo-Garcés, Adrián
2016-01-01
Study Objectives: To analyze the temporal organization of the sleep-wake cycle under food entrainment in the rat. Methods: Eighteen male Sprague-Dawley rats were chronically implanted for polysomnographic recording. During the baseline (BL) protocol, rats were recorded under a 12:12 light-dark (LD) schedule in individual isolation chambers with food and water ad libitum. Food entrainment was performed by means of a 4-h food restriction (FR) protocol starting at photic zeitgeber time 5. Eight animals underwent a 3-h phase advance of the FR protocol (A-FR). We compared the mean curves and acrophases of wakefulness, NREM sleep, and REM sleep under photic and food entrainment and after a phase advance in scheduled food delivery. We further evaluated the dynamics of REM sleep homeostasis and the NREM sleep EEG delta wave profile. Results: A prominent food-anticipatory arousal interval was observed after nine or more days of FR, characterized by increased wakefulness and suppression of REM sleep propensity and dampening of NREM sleep EEG delta activity. REM sleep exhibited a robust nocturnal phase preference under FR that was not explained by a nocturnal REM sleep rebound. The mean curve of sleep-wake states and NREM sleep EEG delta activity remained phase-locked to the timing of meals during the A-FR protocol. Conclusions: Our results support the hypothesis that under food entrainment, the sleep-wake cycle is coupled to a food-entrainable oscillator (FEO). Our findings suggest an unexpected interaction between FEO output and NREM sleep EEG delta activity generators. Citation: Castro-Faúndez J, Díaz J, Ocampo-Garcés A. Temporal organization of the sleep-wake cycle under food entrainment in the rat. SLEEP 2016;39(7):1451–1465. PMID:27091526
Fusion energy from the Moon for the twenty-first century
NASA Technical Reports Server (NTRS)
Kulcinski, G. L.; Cameron, E. N.; Santarius, J. F.; Sviatoslavsky, I. N.; Wittenberg, L. J.; Schmitt, Harrison H.
1992-01-01
It is shown in this paper that the D-He-3 fusion fuel cycle is not only credible from a physics standpoint, but that its breakeven and ignition characteristics could be developed on roughly the same time schedule as the DT cycle. It was also shown that the extremely low fraction of power in neutrons, the lack of significant radioactivity in the reactants, and the potential for very high conversion efficiencies, can result in definite advantages for the D-He-3 cycle with respect to DT fusion and fission reactors in the twenty-first century. More specifically, the D-He-3 cycle can accomplish the following: (1) eliminate the need for deep geologic waste burial facilities and the wastes can qualify for Class A, near-surface land burial; (2) allow 'inherently safe' reactors to be built that, under the worst conceivable accident, cannot cause a civilian fatality or result in a significant (greater than 100 mrem) exposure to a member of the public; (3) reduce the radiation damage levels to a point where no scheduled replacement of reactor structural components is required, i.e., full reactor lifetimes (approximately 30 FPY) can be credibly claimed; (4) increase the reliability and availability of fusion reactors compared to DT systems because of the greatly reduced radioactivity, the low neutron damage, and the elimination of T breeding; and (5) greatly reduce the capital costs of fusion power plants (compared to DT systems) by as much as 50 percent and present the potential for a significant reduction on the COE. The concepts presented in this paper tie together two of the most ambitious high-technology endeavors of the twentieth century: the development of controlled thermonuclear fusion for civilian power applications and the utilization of outer space for the benefit of mankind on Earth.
Fusion energy from the Moon for the twenty-first century
NASA Astrophysics Data System (ADS)
Kulcinski, G. L.; Cameron, E. N.; Santarius, J. F.; Sviatoslavsky, I. N.; Wittenberg, L. J.; Schmitt, Harrison H.
1992-09-01
It is shown in this paper that the D-He-3 fusion fuel cycle is not only credible from a physics standpoint, but that its breakeven and ignition characteristics could be developed on roughly the same time schedule as the DT cycle. It was also shown that the extremely low fraction of power in neutrons, the lack of significant radioactivity in the reactants, and the potential for very high conversion efficiencies, can result in definite advantages for the D-He-3 cycle with respect to DT fusion and fission reactors in the twenty-first century. More specifically, the D-He-3 cycle can accomplish the following: (1) eliminate the need for deep geologic waste burial facilities and the wastes can qualify for Class A, near-surface land burial; (2) allow 'inherently safe' reactors to be built that, under the worst conceivable accident, cannot cause a civilian fatality or result in a significant (greater than 100 mrem) exposure to a member of the public; (3) reduce the radiation damage levels to a point where no scheduled replacement of reactor structural components is required, i.e., full reactor lifetimes (approximately 30 FPY) can be credibly claimed; (4) increase the reliability and availability of fusion reactors compared to DT systems because of the greatly reduced radioactivity, the low neutron damage, and the elimination of T breeding; and (5) greatly reduce the capital costs of fusion power plants (compared to DT systems) by as much as 50 percent and present the potential for a significant reduction on the COE. The concepts presented in this paper tie together two of the most ambitious high-technology endeavors of the twentieth century: the development of controlled thermonuclear fusion for civilian power applications and the utilization of outer space for the benefit of mankind on Earth.
Daily rhythms of locomotor and demand-feeding activities in Schizothorax pelzami (Kessler, 1870).
Ebrahimi, Ehsan; Kamrani, Ehsan; Heydarnejad, Mohammad Saeed; Safari, Omid
2017-01-01
A study was carried out to investigate the daily rhythms of locomotor and feeding activity of Khajoo, Schizothorax pelzami, a candidate species for freshwater aquaculture. Using self-feeder juvenile Khajoo were exposed to a 12/12 LD cycle to determine the rhythms of locomotor and feeding activity. The effects of feeding on locomotor and feeding activity of fish were also examined. Finally, the endogenous rhythmicity under different lighting condition tested. Fish displayed a strictly diurnal feeding and locomotor activities with 98% and 84% of the total activity occurred in the photophase, respectively. In scheduled feeding, both the L-group (fed in light) and the D-group (fed in the dark) showed a diurnal locomotor activity pattern. However, the L-group had a peak of locomotor activity near the feeding time, but the D-group had a scarce locomotor activity in the scatophase with no significant change at the mealtime. Most of the individuals display free-running rhythms when exposed to different lighting condition including, constant darkness, ultradian 45:45 min LD cycle and reversed DL photo cycle. Taken together the results of this study showed that both locomotor and feeding activity have diurnal rhythms in Khajoo S. pelzami, even fish feeding had taken place at night. Additionally, the free-running locomotor activity of the fish in the absence of external light stimuli, suggests the existence of an endogenous timing mechanism in this fish species.
Simulated shift work in rats perturbs multiscale regulation of locomotor activity.
Hsieh, Wan-Hsin; Escobar, Carolina; Yugay, Tatiana; Lo, Men-Tzung; Pittman-Polletta, Benjamin; Salgado-Delgado, Roberto; Scheer, Frank A J L; Shea, Steven A; Buijs, Ruud M; Hu, Kun
2014-07-06
Motor activity possesses a multiscale regulation that is characterized by fractal activity fluctuations with similar structure across a wide range of timescales spanning minutes to hours. Fractal activity patterns are disturbed in animals after ablating the master circadian pacemaker (suprachiasmatic nucleus, SCN) and in humans with SCN dysfunction as occurs with aging and in dementia, suggesting the crucial role of the circadian system in the multiscale activity regulation. We hypothesized that the normal synchronization between behavioural cycles and the SCN-generated circadian rhythms is required for multiscale activity regulation. To test the hypothesis, we studied activity fluctuations of rats in a simulated shift work protocol that was designed to force animals to be active during the habitual resting phase of the circadian/daily cycle. We found that these animals had gradually decreased mean activity level and reduced 24-h activity rhythm amplitude, indicating disturbed circadian and behavioural cycles. Moreover, these animals had disrupted fractal activity patterns as characterized by more random activity fluctuations at multiple timescales from 4 to 12 h. Intriguingly, these activity disturbances exacerbated when the shift work schedule lasted longer and persisted even in the normal days (without forced activity) following the shift work. The disrupted circadian and fractal patterns resemble those of SCN-lesioned animals and of human patients with dementia, suggesting a detrimental impact of shift work on multiscale activity regulation. © 2014 The Author(s) Published by the Royal Society. All rights reserved.
Soares, S M T P; Jannuzzi, H P C; Kassab, M F O; Nucci, L B; Paschoal, M A
2015-09-01
To evaluate the effects of repetition of the 6-minute walk test in patients scheduled to undergo abdominal surgery within the next 48 hours, and to verify the physical capacity of these subjects before surgery. Cross-sectional study. University teaching hospital. Forty-two patients scheduled for elective abdominal surgery within the next 48 hours. Distance walked in the 6-minute walk test, heart rate, peripheral oxygen saturation, dyspnoea and leg fatigue. Thirty-one patients (74%) were able to walk for a longer distance when the test was repeated. In these subjects, the mean increase in distance walked was 35.4 [standard deviation (SD) 19.9]m. Heart rate, dyspnoea and leg fatigue increased significantly over time on both tests (P<0.05). The mean heart rate at the end of the sixth minute was significantly higher on the second test (P=0.022). Peripheral oxygen saturation remained above 90% in both tests. The furthest distance walked was, on average, 461.3 (SD 89.7)m. This value was significantly lower than that predicted for the sample (P<0.001). Patients scheduled to undergo abdominal surgery were able to walk further when they performed a second 6-minute walk test. Moreover, they showed reduced physical ability before surgery. These findings suggest that repetition of the 6-minute walk test may increase the accuracy of the distance walked, which is useful for studies assessing the physical capacity of patients undergoing abdominal surgery. Copyright © 2014 Chartered Society of Physiotherapy. Published by Elsevier Ltd. All rights reserved.
Nurse Scheduling by Cooperative GA with Effective Mutation Operator
NASA Astrophysics Data System (ADS)
Ohki, Makoto
In this paper, we propose an effective mutation operators for Cooperative Genetic Algorithm (CGA) to be applied to a practical Nurse Scheduling Problem (NSP). The nurse scheduling is a very difficult task, because NSP is a complex combinatorial optimizing problem for which many requirements must be considered. In real hospitals, the schedule changes frequently. The changes of the shift schedule yields various problems, for example, a fall in the nursing level. We describe a technique of the reoptimization of the nurse schedule in response to a change. The conventional CGA is superior in ability for local search by means of its crossover operator, but often stagnates at the unfavorable situation because it is inferior to ability for global search. When the optimization stagnates for long generation cycle, a searching point, population in this case, would be caught in a wide local minimum area. To escape such local minimum area, small change in a population should be required. Based on such consideration, we propose a mutation operator activated depending on the optimization speed. When the optimization stagnates, in other words, when the optimization speed decreases, the mutation yields small changes in the population. Then the population is able to escape from a local minimum area by means of the mutation. However, this mutation operator requires two well-defined parameters. This means that user have to consider the value of these parameters carefully. To solve this problem, we propose a periodic mutation operator which has only one parameter to define itself. This simplified mutation operator is effective over a wide range of the parameter value.
Tests of an alternating current propulsion subsystem for electric vehicles on a road load simulator
NASA Astrophysics Data System (ADS)
Stenger, F. J.
1982-12-01
The test results of a breadboard version of an ac electric-vehicle propulsion subsystem are presented. The breadboard was installed in the NASA Lewis Research Center Road Load Simulator facility and tested under steady-state and transient conditions. Steady-state tests were run to characterize the system and component efficiencies over the complete speed-torque range within the capability of the propulsion subsystem in the motoring mode of operation. Transient tests were performed to determine the energy consumption of the breadboard over the acceleration and cruise portions of SAE J227 and driving schedules B, C, and D. Tests in the regenerative mode were limited to the low-gear-speed range of the two speed transaxle used in the subsystem. The maximum steady-state subsystem efficiency observed for the breadboard was 81.5 percent in the high-gear-speed range in the motoring mode, and 76 percent in the regenerative braking mode (low gear). The subsystem energy efficiency during the transient tests ranged from 49.2 percent for schedule B to 68.4 percent for Schedule D.
Tests of an alternating current propulsion subsystem for electric vehicles on a road load simulator
NASA Technical Reports Server (NTRS)
Stenger, F. J.
1982-01-01
The test results of a breadboard version of an ac electric-vehicle propulsion subsystem are presented. The breadboard was installed in the NASA Lewis Research Center Road Load Simulator facility and tested under steady-state and transient conditions. Steady-state tests were run to characterize the system and component efficiencies over the complete speed-torque range within the capability of the propulsion subsystem in the motoring mode of operation. Transient tests were performed to determine the energy consumption of the breadboard over the acceleration and cruise portions of SAE J227 and driving schedules B, C, and D. Tests in the regenerative mode were limited to the low-gear-speed range of the two speed transaxle used in the subsystem. The maximum steady-state subsystem efficiency observed for the breadboard was 81.5 percent in the high-gear-speed range in the motoring mode, and 76 percent in the regenerative braking mode (low gear). The subsystem energy efficiency during the transient tests ranged from 49.2 percent for schedule B to 68.4 percent for Schedule D.
An Improved SoC Test Scheduling Method Based on Simulated Annealing Algorithm
NASA Astrophysics Data System (ADS)
Zheng, Jingjing; Shen, Zhihang; Gao, Huaien; Chen, Bianna; Zheng, Weida; Xiong, Xiaoming
2017-02-01
In this paper, we propose an improved SoC test scheduling method based on simulated annealing algorithm (SA). It is our first to disorganize IP core assignment for each TAM to produce a new solution for SA, allocate TAM width for each TAM using greedy algorithm and calculate corresponding testing time. And accepting the core assignment according to the principle of simulated annealing algorithm and finally attain the optimum solution. Simultaneously, we run the test scheduling experiment with the international reference circuits provided by International Test Conference 2002(ITC’02) and the result shows that our algorithm is superior to the conventional integer linear programming algorithm (ILP), simulated annealing algorithm (SA) and genetic algorithm(GA). When TAM width reaches to 48,56 and 64, the testing time based on our algorithm is lesser than the classic methods and the optimization rates are 30.74%, 3.32%, 16.13% respectively. Moreover, the testing time based on our algorithm is very close to that of improved genetic algorithm (IGA), which is state-of-the-art at present.
2003-11-20
KENNEDY SPACE CENTER, FLA. - This view shows the tiles below the windshield on the orbiter Atlantis. A gap test is being performed on the tiles as part of return-to-flight activities. Atlantis is scheduled for mission STS-114, a return-to-flight test mission to the International Space Station.
NASA Astrophysics Data System (ADS)
Ryu, Sung Jae; Lim, Sung Taek; Vacca, Anthony; Fiekowsky, Peter; Fiekowsky, Dan
2013-09-01
IC fabs inspect critical masks on a regular basis to ensure high wafer yields. These requalification inspections are costly for many reasons including the capital equipment, system maintenance, and labor costs. In addition, masks typically remain in the "requal" phase for extended, non-productive periods of time. The overall "requal" cycle time in which reticles remain non-productive is challenging to control. Shipping schedules can slip when wafer lots are put on hold until the master critical layer reticle is returned to production. Unfortunately, substituting backup critical layer reticles can significantly reduce an otherwise tightly controlled process window adversely affecting wafer yields. One major requal cycle time component is the disposition process of mask inspections containing hundreds of defects. Not only is precious non-productive time extended by reviewing hundreds of potentially yield-limiting detections, each additional classification increases the risk of manual review techniques accidentally passing real yield limiting defects. Even assuming all defects of interest are flagged by operators, how can any person's judgment be confident regarding lithographic impact of such defects? The time reticles spend away from scanners combined with potential yield loss due to lithographic uncertainty presents significant cycle time loss and increased production costs. Fortunately, a software program has been developed which automates defect classification with simulated printability measurement greatly reducing requal cycle time and improving overall disposition accuracy. This product, called ADAS (Auto Defect Analysis System), has been tested in both engineering and high-volume production environments with very successful results. In this paper, data is presented supporting significant reduction for costly wafer print checks, improved inspection area productivity, and minimized risk of misclassified yield limiting defects.
Ivanov, Plamen Ch.; Hu, Kun; Hilton, Michael F.; Shea, Steven A.; Stanley, H. Eugene
2007-01-01
The endogenous circadian pacemaker influences key physiologic functions, such as body temperature and heart rate, and is normally synchronized with the sleep/wake cycle. Epidemiological studies demonstrate a 24-h pattern in adverse cardiovascular events with a peak at ≈10 a.m. It is unknown whether this pattern in cardiac risk is caused by a day/night pattern of behaviors, including activity level and/or influences from the internal circadian pacemaker. We recently found that a scaling index of cardiac vulnerability has an endogenous circadian peak at the circadian phase corresponding to ≈10 a.m., which conceivably could contribute to the morning peak in cardiac risk. Here, we test whether this endogenous circadian influence on cardiac dynamics is caused by circadian-mediated changes in motor activity or whether activity and heart rate dynamics are decoupled across the circadian cycle. We analyze high-frequency recordings of motion from young healthy subjects during two complementary protocols that decouple the sleep/wake cycle from the circadian cycle while controlling scheduled behaviors. We find that static activity properties (mean and standard deviation) exhibit significant circadian rhythms with a peak at the circadian phase corresponding to 5–9 p.m. (≈9 h later than the peak in the scale-invariant index of heartbeat fluctuations). In contrast, dynamic characteristics of the temporal scale-invariant organization of activity fluctuations (long-range correlations) do not exhibit a circadian rhythm. These findings suggest that endogenous circadian-mediated activity variations are not responsible for the endogenous circadian rhythm in the scale-invariant structure of heartbeat fluctuations and likely do not contribute to the increase in cardiac risk at ≈10 a.m. PMID:18093917