Parsley, M.J.; Kofoot, P.
2008-01-01
Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ward, David L.; Kern, J. Chris; Hughes, Michele L.
2004-02-01
We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.
Delonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Braaten, Patrick J.; Buhl, Kevin J.; Eder, Brandon L; Elliott, Caroline M.; Erwin, Susannah O.; Fuller, David B.; Haddix, Tyler M.; Ladd, Hallie L.A.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wesolek, Christopher J.; Wildhaber, Mark L.
2016-01-20
The research tasks in the 2013 scope of work emphasized understanding reproductive migrations and spawning of adult pallid sturgeon, and hatch and drift of free embryos and larvae. These tasks were addressed in four study sections located in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Upper Missouri River downstream from Fort Peck Dam, including downstream reaches of the Milk River, the Lower Yellowstone River, and the Lower Missouri River downstream from Gavins Point Dam. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2013.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris
2005-08-01
We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.
Parsley, M.J.; Kofoot, P.
2006-01-01
River discharge and water temperatures that occurred during April through July 2004 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for 3-4 weeks and coincided with the peak of the river hydrograph. However, the peak of the hydrograph was relatively low compared to past years, which is reflected in the relatively low monthly and annual indices of suitable spawning habitat. Bottom-trawl sampling in the Bonneville Reservoir revealed the presence of young-of-theyear (YOY) white sturgeon.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mallette, Christine
2009-07-28
We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year studymore » with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.« less
DeLonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Annis, Mandy L.; Braaten, P. J.; Elliott, Caroline M.; Fuller, D. B.; Haas, Justin D.; Haddix, Tyler M.; Ladd, Hallie L.A.; McElroy, Brandon J.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wildhaber, Mark L.
2014-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2011 scope of work emphasized understanding of reproductive migrations and spawning of adult sturgeon, and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and including downstream reaches of the Milk River, and the Lower Yellowstone River. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2011.
Delonay, Aaron J.; Chojnacki, Kimberly A.; Jacobson, Robert B.; Braaten, Patrick J.; Buhl, Kevin J.; Elliott, Caroline M.; Erwin, Susannah O.; Faulkner, Jacob D.A.; Candrl, James S.; Fuller, David B.; Backes, Kenneth M.; Haddix, Tyler M.; Rugg, Matthew L.; Wesolek, Christopher J.; Eder, Brandon L.; Mestl, Gerald E.
2016-03-16
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery Program–Integrated Science Program. The project research consists of several interdependent and complementary tasks that involve multiple disciplines.The project research tasks in the 2014 scope of work emphasized understanding of reproductive migrations and spawning of adult pallid sturgeon and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and downstream reaches of the Milk River, and the Lower Yellowstone River. The project research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2014.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigro, Anthony A.; Ward, David L.
1985-05-01
This report summarizes results of the first year of a study initiated in September 1984 to evaluate the adequacy of channel modifications made in the lower Umatilla River to improve adult anadromous salmonid passage to Three Mile Dam (RKm 5.6), determine if fish passage or delay problems exist at Three Mile Dam and recommend site specific corrective measures if needed. Movements of steelhead (Salmo gairdneri) were monitored using mark and recapture and radio telemetry techniques. Thirty-four steelhead were marked with T-anchor tags and released in the lower river. Fifteen of those marked were also fitted with radio transmitters. Three radiotaggedmore » steelhead migrated through channel modifications to Three Mile Dam. Two of these fish migrated to the dam in less than 26 hours, but held just below the dam for 7 and 10 days before entering the ladders. The third steelhead delayed for 30 days and entered the west ladder within 24 hours of arrival at the dam. Two other radiotagged steelhead moved upstream through some of the channel modifications but did not migrate to the dam. Only one of 19 marked steelhead not fitted with transmitters was recovered at Three Mile Dam. 14 refs., 18 figs., 3 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beamesdorfer, Raymond C.; Nigro, Anthony A.
We report on our progress from April 1992-March 1993 in research on white sturgeon in the lower Columbia River. The study began in July 1986 and progress through 1992 was summarized in a comprehensive report in 2 volumes (Beamesderfer and Nigro 1993a, 1993b). This report details activities during the first year of Phase II of this sturgeon research. In Phase I, we assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The statusmore » and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, U.S. Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparations for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report.« less
Parsley, M.J.; Kofoot, P.
2007-01-01
River discharge and water temperatures that occurred during April through July 2005 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for 3-4 weeks and coincided with the peak of the river hydrograph. However, the peak of the hydrograph occurred in mid May and discharges dropped quickly and water temperature rose during June, which is reflected in the monthly and annual indices of suitable spawning habitat. Indices of available spawning habitat for the month of June 2005 were less than one-half of the average of the period from 1985-2004. Bottom-trawl sampling in the Bonneville Reservoir revealed the presence of young-of-the-year (YOY) white sturgeon but the proportion of positive tows was quite low at 0.06.
Koltun, G.F.
2009-01-01
This report describes the results of a study to determine frequency characteristics of postregulation annual peak flows at streamflow-gaging stations at or near the Lockington, Taylorsville, Englewood, Huffman, and Germantown dry dams in the Miami Conservancy District flood-protection system (southwestern Ohio) and five other streamflow-gaging stations in the Great Miami River Basin further downstream from one or more of the dams. In addition, this report describes frequency characteristics of annual peak elevations of the dry-dam pools. In most cases, log-Pearson Type III distributions were fit to postregulation annual peak-flow values through 2007 (the most recent year of published peak-flow values at the time of this analysis) and annual peak dam-pool storage values for the period 1922-2008 to determine peaks with recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years. For one streamflow-gaging station (03272100) with a short period of record, frequency characteristics were estimated by means of a process involving interpolation of peak-flow yields determined for an upstream and downstream gage. Once storages had been estimated for the various recurrence intervals, corresponding dam-pool elevations were determined from elevation-storage ratings provided by the Miami Conservancy District.
Singer, M.B.
2007-01-01
This paper reports basinwide patterns of hydrograph alteration via statistical and graphical analysis from a network of long-term streamflow gauges located various distances downstream of major dams and confluences in the Sacramento River basin in California, USA. Streamflow data from 10 gauging stations downstream of major dams were divided into hydrologic series corresponding to the periods before and after dam construction. Pre- and post-dam flows were compared with respect to hydrograph characteristics representing frequency, magnitude and shape: annual flood peak, annual flow trough, annual flood volume, time to flood peak, flood drawdown time and interarrival time. The use of such a suite of characteristics within a statistical and graphical framework allows for generalising distinct strategies of flood control operation that can be identified without any a priori knowledge of operations rules. Dam operation is highly dependent on the ratio of reservoir capacity to annual flood volume (impounded runoff index). Dams with high values of this index generally completely cut off flood peaks thus reducing time to peak, drawdown time and annual flood volume. Those with low values conduct early and late flow releases to extend the hydrograph, increasing time to peak, drawdown time and annual flood volume. The analyses reveal minimal flood control benefits from foothill dams in the lower Sacramento River (i.e. dissipation of the down-valley flood control signal). The lower part of the basin is instead reliant on a weir and bypass system to control lowland flooding. Data from a control gauge (i.e. with no upstream dams) suggest a background signature of global climate change expressed as shortened flood hydrograph falling limbs and lengthened flood interarrival times at low exceedence probabilities. This research has implications for flood control, water resource management, aquatic and riparian ecosystems and for rehabilitation strategies involving flow alteration and/or manipulation of sediment supplies. Copyright ?? 2006 John Wiley & Sons, Ltd.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 100 [Docket No. USCG-2012-1094] Special Local Regulation; Annual Marine Events on the Colorado River, Between Davis Dam (Bullhead City, AZ) and Headgate Dam (Parker, AZ) Within the San Diego Captain of the Port Zone AGENCY: Coast Guard, DHS. ACTION...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 100 [Docket No. USCG-2012-0925] Special Local Regulation; Annual Marine Events on the Colorado River, Between Davis Dam (Bullhead City, AZ) and Headgate Dam (Parker, AZ) Within the San Diego Captain of the Port Zone AGENCY: Coast Guard, DHS. ACTION...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Laughlin Tourism Committee. Event Description Fireworks Display Date First week in July. Location Laughlin... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Annual Firework Events on the... § 165.1124 Annual Firework Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Laughlin Tourism Committee. Event Description Fireworks Display Date First week in July. Location Laughlin... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Annual Firework Events on the... § 165.1124 Annual Firework Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ward, David L.
The authors report on their progress from April 1997 through March 1998 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), National Marine Fisheries Service (NMFS; Report D), U.S. Fish andmore » Wildlife Service (USFWS; Report E), and Columbia River Inter-Tribal Fish Commission (CRITFC; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of the work from April 1997 through March 1998 listed.« less
Sediment budget as affected by construction of a sequence of dams in the lower Red River, Viet Nam
NASA Astrophysics Data System (ADS)
Lu, Xi Xi; Oeurng, Chantha; Le, Thi Phuong Quynh; Thuy, Duong Thi
2015-11-01
Dam construction is one of the main factors resulting in riverine sediment changes, which in turn cause river degradation or aggradation downstream. The main objective of this work is to examine the sediment budget affected by a sequence of dams constructed upstream in the lower reach of the Red River. The study is based on the longer-term annual data (1960-2010) with a complementary daily water and sediment data set (2008-2010). The results showed that the stretch of the river changed from sediment surplus (suggesting possible deposition processes) into sediment deficit (possible erosion processes) after the first dam (Thac Ba Dam) was constructed in 1972 and changed back to deposition after the second dam (Hoa Binh Dam) was constructed in 1985. The annual sediment deposition varied between 1.9 Mt/y and 46.7 Mt/y with an annual mean value of 22.9 Mt/y (1985-2010). The sediment deposition at the lower reach of the Red River would accelerate river aggradation which would change river channel capacity in the downstream of the Red River. The depositional processes could be sustained or changed back to erosional processes after more dams (the amount of sediment deposit was much less after the latest two dams Tuyen Quang Dam in 2009 and Sonla Dam in 2010) are constructed, depending on the water and sediment dynamics. This study revealed that the erosional and depositional processes could be shifted for the same stretch of river as affected by a sequence of dams and provides useful insights in river management in order to reduce flood frequency along the lower reach of the Red River.
Gas bubble disease in resident fish below Grand Coulee Dam: final report of research
Beeman, J.W.; Venditti, D.A.; Morris, R.G.; Gadomski, D.M.; Adams, B.J.; Vanderkooi, S.J.; Robinson, T.C.; Maule, A.G.
2003-01-01
Fish kills have occurred in the reservoir below Grand Coulee Dam possibly due to total dissolved gas supersaturation (TDGS), which occurs when water cascades over a dam or waterfall. The highest TDGS below Grand Coulee Dam has occurred after spilling water via the outlet tubes, though TDGS from upstream sources has also been recorded. Exposure to TDGS can cause gas bubble disease in aquatic organisms. This disease, analogous to ‘the bends’ in human divers, can range from mild to fatal depending on the level of supersaturation, species, life cycle stage, condition of the fish, fish depth, and the water temperature. The USGS, Western Fisheries Research Center’s Columbia River Research Laboratory conducted field and laboratory experiments to determine the relative risks of TDGS to various species of fish in the reservoir below the dam (Rufus Woods Lake). Field work included examination of over 8000 resident fish for signs of gas bubble disease, examination of the annual growth increments of several species relative to ambient TDGS, and recording the in-situ depths and temperatures of several species using miniature recorders surgically implanted in both resident fish and triploid steelhead reared in commercial net pens. Laboratory experiments included bioassays of the progression of signs and mortality of several species at various TDGS levels. The overarching objective of these studies was to provide data to enable sound management decisions regarding the effects of TDGS in the reservoir below Grand Coulee Dam, though the data may also be applicable to other locations.
NASA Astrophysics Data System (ADS)
Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.
2016-12-01
We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.
Irwin, Elise R.
2014-01-01
Hydroelectric dams are a flexible source of power, provide flood control, and contribute to the economic growth of local communities through real-estate and recreation. Yet the impoundment of rivers can alter and fragment miles of critical riverine habitat needed for other competing needs such as downstream consumptive water use, fish and wildlife population viability, or other forms of recreation. Multiple conflicting interests can compromise progressive management especially with recognized uncertainties related to whether management actions will fulfill the objectives of policy makers, resource managers and/or facility owners. Decision analytic tools were used in a stakeholder-driven process to develop and implement a template for evaluation and prediction of the effects of water resource management of multiple-use systems under the context provided by R.L. Harris Dam on the Tallapoosa River, Alabama, USA. The approach provided a transparent and structured framework for decision-making and incorporated both existing and new data to meet multiple management objectives. Success of the template has been evaluated by the stakeholder governing body in an adaptive resource management framework since 2005 and is ongoing. Consequences of management of discharge at the dam were evaluated annually relative to stakeholder satisfaction to allow for adjustment of both management scenarios and objectives. This template can be applied to attempt to resolve conflict inherent in many dam-regulated systems where management decisions impact diverse values of stakeholders.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ward, David L.
The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia Rivermore » Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 100 [Docket No. USCG-2013-0644] Special Local Regulations; Annual Marine Events on the Colorado River, Between Davis Dam (Bullhead City, Arizona... INFORMATION: The Coast Guard will enforce the special local regulations on the Colorado River for the...
Thermal effects of dams in the Willamette River basin, Oregon
Rounds, Stewart A.
2010-01-01
Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm
53. McMILLAN DAM Photographic copy of historic photo, 1937 ...
53. McMILLAN DAM - Photographic copy of historic photo, 1937 (original print in '1937 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN DAM AFTER RECONSTRUCTION' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM
NASA Astrophysics Data System (ADS)
Yaghmaei, Hiva; Sadeghi, Seyed Hamidreza; Moradi, Hamidreza; Gholamalifard, Mehdi
2018-02-01
Trends in flow discharge, temperature and rainfall from the Qom Rood Watershed, Iran, for a period of 1979-2016 were analyzed at monthly and annual time scales. Trend analyses were conducted using the Mann-Kendall test, the double-mass curve of mean annual discharge versus rainfall, and rainfall-runoff relationship before and after the 15 Khordad Dam operation. Multiple regression of flow discharge against rainfall and temperature was used to determine the residual trend at four meteorological and hydrological stations located upstream and downstream of the Qom Rood Watershed. Results showed that the temperature at the upstream and downstream stations did not have any significant trend, but a significant decreasing trend (P < .05) in rainfall was detected only in May (z = -1.66) at the downstream stations. There was a significant positive trend (P < .05) in rainfall in February (z = 2.22) and July (z = 2.15) at the upstream stations, and in October (z = 2.3) and November (z = 1.8) at the downstream stations. However, there was a noticeable decrease in monthly and annual flow discharge, and residual trend at 99% significance level at the downstream stations. At the upstream stations, the flow discharges had significant (P < .05) declining trend in all months, but annual flow discharge did not change significantly. Analysis of double mass curve between runoff and rainfall at the downstream stations showed an inconsistency in the line slope concordant with the time of 15 Khordad Dam operation. Annual mean discharge at the upstream stations did not show a significant change before and after 15 Khordad Dam operation. However, annual flow magnitude decreased significantly by 87.5 and 81.7% in Shad Abad and KoohSefid, respectively. These results confirmed that natural driving forces did not affect flow discharge changes and the observed decreasing tendency in flow discharge at the downstream stations was due to 15 Khordad Dam, and at the upstream stations due to diversion/storage dams. These findings highlighted the role of human interference in changing the hydrologic regime in the study area based on which appropriate adaptive decisions can be made.
Hydrological impact of high-density small dams in a humid catchment, Southeast China
NASA Astrophysics Data System (ADS)
Lu, W.; Lei, H.; Yang, D.
2017-12-01
The Jiulong River basin is a humid catchment with a drainage area of 14,741 km2; however, it has over 1000 hydropower stations within it. Such catchment with high-density small dams is scarce in China. Yet few is known about the impact of high-density small dams on streamflow changes. To what extent the large number of dams alters the hydrologic patterns is a fundamental scientific issue for water resources management, flood control, and aquatic ecological environment protection. Firstly, trend and change point analyses are applied to determine the characteristics of inter-annual streamflow. Based on the detected change point, the study period is divided into two study periods, the ``natural'' and ``disturbed'' periods. Then, a geomorphology-based hydrological model (GBHM) and the fixing-changing method are adopted to evaluate the relative contributions of climate variations and damming to the changes in streamflow at each temporal scale (i.e., from daily, monthly to annual). Based on the simulated natural streamflow, the impact of dam construction on hydrologic alteration and aquatic ecological environment will be evaluated. The hydrologic signatures that will be investigated include flood peak, seasonality of streamflow, and the inter-annual variability of streamflow. In particular, the impacts of damming on aquatic ecological environment will be investigated using eco-flow metrics and indicators of hydrologic alteration (IHA) which contains 33 individual streamflow statistics that are closely related to aquatic ecosystem. The results of this study expect to provide a reference for reservoir operation considering both ecological and economic benefits of such operations in the catchment with high-density dams.
75. AVALON DAM Photographic copy of historic photo, April ...
75. AVALON DAM - Photographic copy of historic photo, April 10, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'AVALON DAM - CCC ROCK WORK AT SPILLWAY NO. 2' - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM
52. McMILLAN DAM Photographic copy of historic photo, January ...
52. McMILLAN DAM - Photographic copy of historic photo, January 15, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN DAM - TRIMMING EARTH SLOPE BEFORE GRAVEL PLACING' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM
NASA Astrophysics Data System (ADS)
Loomis, John
2002-06-01
A travel cost demand model that uses intended trips if dams are removed and the river restored is presented as a tool for evaluating the potential recreation benefits in this counterfactual but increasingly policy relevant analysis of dam removal. The model is applied to the Lower Snake River in Washington using data from mail surveys of households in the Pacific Northwest region. Five years after dam removal, about 1.5 million visitor days are estimated, with this number growing to 2.5 million annually during years 20-100. Using the travel cost method model estimate of the value of river recreation, if the four dams are removed and the 225 km river is restored, the annualized benefits at a 6.875% discount rate would be $310 million. This gain in river recreation exceeds the loss of reservoir recreation but is about $60 million less than the total costs of the dam removal alternative. The analysis suggests this extension of the standard travel cost method may be suitable for evaluating the gain in river recreation associated with restoration of river systems from dam removal or associated with dam relicensing conditions.
NASA Astrophysics Data System (ADS)
Nukazawa, Kei; Kihara, Kousuke; Suzuki, Yoshihiro
2017-12-01
Rivers fulfill an essential ecological role by forming networks for material transport from upland forests to coastal areas. The way in which dams affect the organic and inorganic cycles in such systems is not well understood. Herein, we investigated the longitudinal profiles of the various components of the water chemistry across three cascade dams in Japan: the Yamasubaru Dam, Saigou Dam, and Ohuchibaru Dam, which are situated along the sediment-productive Mimi River in different flow conditions. We analyzed the following water quality components: suspended solids (SS), turbidity, total iron (TFe), dissolved iron (DFe), total organic carbon (TOC), total nitrogen (TN), total phosphorus (TP), humic substance (HS), and major ionic components (Na+, Mg2+, Ca2+, Cl-, NO3-, and SO42-) in the downstream channels of the three dams during the low-intermediate-flow and high-flow events from 2012 to 2014. We estimated hourly loads of each component using hourly turbidity data and discharge data (i.e., L-Q model) separately, and the results are integrated to estimate the annual fluxes. The annual fluxes between the methods were compared to verify predictability of the conventional L-Q models. Annual flux of TOC, TN, DFe, and HS estimated by the turbidity displayed similar values, whereas the flux of SS, TFe, and TP tended to increase downstream of the dams. Among the dams, estimated flux proportions for TP and TFe were higher during high-flow events (74%-94%). Considering geographic conditions (e.g., absence of major tributary between the dams), the result implies that accumulated TP and TFe in the reservoirs may be flushed and transported downstream with SS over the short height dams during flood events. Assuming this process, the reservoir dams probably make only a fractional contribution to the organic and inorganic transport in the catchment studied. The percent flux errors for SS, TFe, and TP fluxes ranged from -7.2% to -97% (except for the TP flux in 2013), which highlights the risk of underestimating these components when using an L-Q model.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-23
... Local Regulation; Annual Marine Events on the Colorado River Between Davis Dam (Bullhead City, AZ) and... during the Lake Havasu City Boat Parade of Lights on December 01, 2012 from 5 p.m. to 9 p.m. This event... Lake Havasu City Boat Parade of Lights (Item 10 on Table 1 of 33 CFR 100.1102). The Coast Guard will...
76. AVALON DAM Photographic copy of historic photo, 1939 ...
76. AVALON DAM - Photographic copy of historic photo, 1939 (original print in '1939 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown VIEW OF CCC WORKERS COMPLETING CONSTRUCTION OF SUSPENSION BRIDGE - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM
NASA Astrophysics Data System (ADS)
Bountry, J.; Godaire, J.; Bradley, D. N.
2017-12-01
At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods using historical trends, current field data, and hydraulic and sediment transport models. We present options for adaptive management for dam and reservoir sediment operations that incorporates monitoring of river processes to inform annual implementation strategies along with long-term planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fredenberg, Wade; Carty, Daniel; Cavigli, Jon
1996-06-01
The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less
Dam nation: A geographic census of American dams and their large-scale hydrologic impacts
NASA Astrophysics Data System (ADS)
Graf, William L.
1999-04-01
Newly available data indicate that dams fragment the fluvial system of the continental United States and that their impact on river discharge is several times greater than impacts deemed likely as a result of global climate change. The 75,000 dams in the continental United States are capable of storing a volume of water almost equaling one year's mean runoff, but there is considerable geographic variation in potential surface water impacts. In some western mountain and plains regions, dams can store more than 3 year's runoff, while in the Northeast and Northwest, storage is as little as 25% of the annual runoff. Dams partition watersheds; the drainage area per dam varies from 44 km2 (17 miles2) per dam in New England to 811 km2 (313 miles2) per dam in the Lower Colorado basin. Storage volumes, indicators of general hydrologic effects of dams, range from 26,200 m3 km-2 (55 acre-feet mile-2) in the Great Basin to 345,000 m3 km-2 (725 acre-feet mile-2) in the South Atlantic region. The greatest river flow impacts occur in the Great Plains, Rocky Mountains, and the arid Southwest, where storage is up to 3.8 times the mean annual runoff. The nation's dams store 5000 m3 (4 acre-feet) of water per person. Water resource regions have experienced individualized histories of cumulative increases in reservoir storage (and thus of downstream hydrologic and ecologic impacts), but the most rapid increases in storage occurred between the late 1950s and the late 1970s. Since 1980, increases in storage have been relatively minor.
54. McMILLAN DAM Photographic copy of historic photo, May ...
54. McMILLAN DAM - Photographic copy of historic photo, May 5, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN HEADGATE OPEN AFTER COMPLETION' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM
18 CFR 11.5 - Exemption of minor projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Government Dams § 11.5 Exemption of minor projects. No exemption will be made from payment of annual charges for the use of Government dams or tribal lands within Indian reservations but licenses may be issued...
18 CFR 11.5 - Exemption of minor projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Government Dams § 11.5 Exemption of minor projects. No exemption will be made from payment of annual charges for the use of Government dams or tribal lands within Indian reservations but licenses may be issued...
NASA Astrophysics Data System (ADS)
Kameyama, S.; Nohara, S.; Sato, T.; Fujii, Y.; Kudo, K.
2009-12-01
The Mekong River watershed is undergoing rapid economic progress and population growth, raising conflicts between watershed development and environmental conservation. A typical conflict is between the benefits of dam construction versus the benefits of watershed ecological services. In developed countries, this conflict is changing to a coordinated search for outcomes that are mutually acceptable to all stakeholders. In the Mekong River, however, government policy gives priority to watershed development for ensuring steady energy supplies. Since the 1990s, a series of dams called “the Mekong Cascade” have been under construction. Dam construction has multiple economic values as electric power supply, irrigation water, flood control, etc. On the other hand, the artificial flow discharge controls of dam moderate seasonal hydrologic patterns of the Asian monsoon region. Dam operations can change the sediment transport regime and river structure. Furthermore, their impacts on watershed ecosystems and traditional economic activities of fisheries and agriculture in downstream areas may be severe. We focus on dam impacts on spatio-temporal patterns of sediment transport and seasonal flood in riparian areas downstream from Mekong River dams. Our study river section is located on 100 km down stream from the Golden Triangle region of Myanmar, Laos, and Thailand. We selected a 10-km section in this main channel to simulate seasonal flooding. We modeled the river hydrology in the years 1991 and 2002, before and after the Manwan dam construction (1986-1993). For this simulation, we adapted three models (distributed runoff model, 1-D hydrological model, and 2-D flood simulation with sediment movement algorithm.) Input data on river structure, water velocity, and flow volume were acquired from field survey data in November 2007 and 2008. In the step of parameter decision, we adopted the shuffled complex evolution method. To validate hydrologic parameters, we used annual water level data observed in Chiang Sean and Luang Prabang. To calculate sediment flux volume, we employed a Load-Quantity equation using total suspended solids data from monthly water sampling and flow discharge volumes over 13 months. To evaluate the impact of dam construction and watershed development, we inputted the same year of precipitation data using two watershed conditions with different parameters. Our results from the 1-D model displayed a seasonal delay of water flooding time after summer rainy season and an increase in sediment transport volume from September to October. In the flood simulation by the 2-D model, most of the annual sediment transport was concentrated from July to October. The spatial pattern of sediment dynamics was dependent largely on river structure including river meander shape, river bottom elevation, and geometry of the riparian zone. Our study approaches and simulation results show promise for beginning a quantitative assessment approach to cross-boundary environmental issues in the Mekong River watershed.
Wright, Scott A.; Grams, Paul E.
2010-01-01
This report describes numerical modeling simulations of sand transport and sand budgets for reaches of the Colorado River below Glen Canyon Dam. Two hypothetical Water Year 2011 annual release volumes were each evaluated with six hypothetical operational scenarios. The six operational scenarios include the current operation, scenarios with modifications to the monthly distribution of releases, and scenarios with modifications to daily flow fluctuations. Uncertainties in model predictions were evaluated by conducting simulations with error estimates for tributary inputs and mainstem transport rates. The modeling results illustrate the dependence of sand transport rates and sand budgets on the annual release volumes as well as the within year operating rules. The six operational scenarios were ranked with respect to the predicted annual sand budgets for Marble Canyon and eastern Grand Canyon reaches. While the actual WY 2011 annual release volume and levels of tributary inputs are unknown, the hypothetical conditions simulated and reported herein provide reasonable comparisons between the operational scenarios, in a relative sense, that may be used by decision makers within the Glen Canyon Dam Adaptive Management Program.
10. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
10. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1919. Vol. I, RG 75, Entry 655, Box 25, National Archives, Washington, DC.) ASHURST-HAYDEN (FLORENCE) DAM SITE, BRUSH DAM ACROSS THE RIVER - San Carlos Irrigation Project, Ashurst-Hayden Dam, Gila River, T4S R11E S7, Coolidge, Pinal County, AZ
Fault-dominated deformation in an ice dam during annual filling and drainage of a marginal lake
Walder, J.S.; Trabant, D.C.; Cunico, M.; Anderson, S.P.; Anderson, R. Scott; Fountain, A.G.; Malm, A.
2005-01-01
Ice-dammed Hidden Creek Lake, Alaska, USA, outbursts annually in about 2-3 days. As the lake fills, a wedge of water penetrates beneath the glacier, and the surface of this 'ice dam' rises; the surface then falls as the lake drains. Detailed optical surveying of the glacier near the lake allows characterization of ice-dam deformation. Surface uplift rate is close to the rate of lake-level rise within about 400 m of the lake, then decreases by 90% over about 100 m. Such a steep gradient in uplift rate cannot be explained in terms of ice-dam flexure. Moreover, survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. Evidently, the zone of steep uplift gradient is a fault zone, with the faults penetrating the entire thickness of the ice dam. Fault motion is in a reverse sense as the lake fills, but in a normal sense as the lake drains. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.
Water level response to hydropower development in the upper Mekong River.
Li, Shaojuan; He, Daming
2008-05-01
Environmental changes and their transboundary influences on the Mekong watercourse system have been an international research focus in recent years, but the opinions and results related to the impacts of upper Mekong River dams are quite different. In this paper, based on the records of water levels from 1960 to 2003 at three mainstream sites in the upper Mekong River, a quantitative examination has been undertaken into characteristics of the mainstream water-level process at multiple timescales and its response to cascade development. The major results are: i) Annual mean, wet period mean, and the mean water levels during the period between March and April (PBMA period) exhibit a significant increasing trend at Jiuzhou and Yunjinghong sites, which are influenced by large-scale factors such as climate change and solar activity. ii) The interdecadal and interannual variations of annual mean, annual maximum, and wet period mean water levels at three sites show similar features during the dam construction period. iii) The interdecadal variations of PBMA period water level show a gradual increase at Gajiu and Yunjinghong sites but a falling trend at Jiuzhou; these trends confirm that there is some regulation on the flow in the dry season caused by the two existing dams. iv) The downstream effects of the present dams on water levels are very limited at the annual mean and wet season mean levels, not apparent at the monthly and yearly timescales, and relatively significant at daily and hourly timescales.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buchanan, Rebecca A.; Skalski, John R.; Broms, Kristin
The combined juvenile and adult detection histories of PIT-tagged wild salmonids migrating through the Federal Columbia River Power System (FCRPS) were analyzed using the ROSTER (River-Ocean Survival and Transportation Effects Routine) statistical release-recapture model. This model, implemented by software Program ROSTER, was used to estimate survival on large temporal and spatial scales for PIT-tagged wild spring and summer Chinook salmon and steelhead released in the Snake River Basin upstream of Lower Granite Dam from 1996 to 2004. In addition, annual results from wild salmonids were compared with results from hatchery salmonids, which were presented in a previous report in thismore » series (Buchanan, R. A., Skalski, J. R., Lady, J. L., Westhagen, P., Griswold, J., and Smith, S. 2007, 'Survival and Transportation Effects for Migrating Snake River Hatchery Chinook Salmon and Steelhead: Historical Estimates from 1996-2003', Technical report, Bonneville Power Administration, Project 1991-051-00). These results are reported here. Annual estimates of the smolt-to-adult return ratio (SAR), juvenile inriver survival from Lower Granite to Bonneville, the ocean return probability from Bonneville to Bonneville, and adult upriver survival from Bonneville to Lower Granite are reported. Annual estimates of transport-inriver (T/I) ratios and differential post-Bonneville mortality (D) are reported on a dam-specific basis for release years with sufficient numbers of wild PIT-tagged smolts transported. Transportation effects are estimated only for dams where at least 1,000 tagged wild smolts were transported from a given upstream release group. Because few wild Chinook salmon and steelhead tagged upstream of Lower Granite Dam were transported before the 2003 release year, T/I and D were estimated only for the 2003 and 2004 release years. Performance measures include age-1-ocean adult returns for steelhead, but not for Chinook salmon. Spring and summer Chinook salmon release groups were pooled across the entire Snake River Basin upstream of Lower Granite Dam for this report. Annual estimates of SAR from Lower Granite back to Lower Granite averaged 0.92% with an estimated standard error (dSE) of 0.25% for wild spring and summer Chinook salmon for tagged groups released from 1996 through 2004, omitting age-1-ocean (jack) returns. Only for the 1999 and 2000 release years did the wild Chinook SAR approach the target value of 2%, identified by the NPCC as the minimum SAR necessary for recovery. Annual estimates of SAR for wild steelhead from the Snake River Basin averaged 0.63% (dSE = 0.15%), including age-1-ocean returns, for release years 1996 through 2004. For release years when the ocean return probability from Bonneville back to Bonneville could be estimated (i.e., 1999 through 2004), it was estimated that on average approximately 83% of the total integrated mortality for nontransported, tagged wild spring and summer Chinook, and 78% for steelhead (omitting the 2001 release year), occurred during the ocean life stage (i.e., from Bonneville to Bonneville). This suggests that additional monitoring and research efforts should include the ocean and estuary environment. Annual estimates of the dam-specific T/I for Lower Granite Dam were available for the 2003 and 2004 release years for both wild Chinook salmon and wild steelhead. The estimated T/I for Lower Granite was significantly > 1.0 for Chinook in 2004 (P < 0.0001) and for steelhead in both 2003 (P < 0.0001) and 2004 (P < 0.0001), indicating that for these release years, wild fish transported at Lower Granite returned there in higher proportions than fish that were returned to the river at Lower Granite, or that passed Lower Granite without detection as juveniles. Annual estimates of the dam-specific T/I for Little Goose Dam were available for wild Chinook salmon for both 2003 and 2004. The estimated T/I for Little Goose was significantly > 1.0 for wild Chinook in 2004 (P = 0.0024), but not in 2003 (P = 0.1554). Differential post-Bonneville mortality (D) is the ratio of post-Bonneville survival to Lower Granite Dam of transported fish to that of nontransported ('inriver') fish. Estimates of D were available for transportation from Lower Granite and Little Goose dams in 2003 and 2004 for wild Chinook, and from Lower Granite Dam in 2003 and 2004 for wild steelhead. Point estimates ranged from 0.74 (dSE = 0.29) for transportation of wild Chinook salmon from Lower Granite Dam in 2003 to 1.91 (dSE = 0.61) for transportation of wild steelhead from Lower Granite Dam in 2003. Small transport groups resulted in high uncertainty on the point estimates, and only for 2003 steelhead transported from Lower Granite Dam did transported fish have significantly greater post-Bonneville survival than nontransported fish (P = 0.0213).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.
Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.
White, M.A.; Schmidt, J.C.; Topping, D.J.
2005-01-01
Wavelet analysis is a powerful tool with which to analyse the hydrologic effects of dam construction and operation on river systems. Using continuous records of instantaneous discharge from the Lees Ferry gauging station and records of daily mean discharge from upstream tributaries, we conducted wavelet analyses of the hydrologic structure of the Colorado River in Grand Canyon. The wavelet power spectrum (WPS) of daily mean discharge provided a highly compressed and integrative picture of the post-dam elimination of pronounced annual and sub-annual flow features. The WPS of the continuous record showed the influence of diurnal and weekly power generation cycles, shifts in discharge management, and the 1996 experimental flood in the post-dam period. Normalization of the WPS by local wavelet spectra revealed the fine structure of modulation in discharge scale and amplitude and provides an extremely efficient tool with which to assess the relationships among hydrologic cycles and ecological and geomorphic systems. We extended our analysis to sections of the Snake River and showed how wavelet analysis can be used as a data mining technique. The wavelet approach is an especially promising tool with which to assess dam operation in less well-studied regions and to evaluate management attempts to reconstruct desired flow characteristics. Copyright ?? 2005 John Wiley & Sons, Ltd.
Remo, Jonathan W.F.; Ickes, Brian; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.
2018-01-01
The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a ~1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.
NASA Astrophysics Data System (ADS)
Remo, Jonathan W. F.; Ickes, Brian S.; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.
2018-07-01
The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a 1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sylvester, Ryan; Stephens, Brian; Tohtz, Joel
2009-04-03
A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidlymore » discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.« less
NASA Astrophysics Data System (ADS)
Salami, Adebayo Wahab; Sule, Bolaji Fatai; Adunkpe, Tope Lacroix; Ayanshola, Ayanniyi Mufutau; Bilewu, Solomon Olakunle
2017-03-01
Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir's live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carty, Daniel; Knoetek, W. Ladd
1997-06-01
Kokanee salmon Oncorhynchus nerka were introduced into Flathead Lake in 1916. The kokanee population declined in the 1960s and 1970s, and kokanee disappeared from Flathead Lake in the late 1980s. Their disappearance has been attributed to the long-term effects of the construction and operation of Hungry Horse and Kerr dams, excessive harvest by anglers, and changes in the lake food web induced by the introduction of opossum shrimp Mysis relicta. Attempts to reestablish kokanee in the Flathead Lake ecosystem between 1988 and 1991 were unsuccessful. In 1991, Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribesmore » (CSKT) wrote a mitigation plan to restore kokanee to Flathead Lake. In 1993, MFWP, CSKT, and the U.S. Fish and Wildlife Service wrote a mitigation implementation plan that initiated a 5-year test program to use hatchery-reared fish to reintroduce kokanee to the lake. Stocking hatchery-reared kokanee into Flathead Lake began in 1993; the 5-year {open_quotes}kokanee test{close_quotes} started in 1994 and is scheduled to continue through 1998. The annual stocking objective is 1 million yearling kokanee (6-8 in long). Criteria used to evaluate the success of the 5-year test are (1) 30% survival of kokanee 1 year after stocking, (2) yearling-to-adult survival of 10%, and (3) annual harvest of 50,000 kokanee ({ge} 11 in) and fishing effort {ge} 100,000 angler hours.« less
Simulating future water temperatures in the North Santiam River, Oregon
NASA Astrophysics Data System (ADS)
Buccola, Norman L.; Risley, John C.; Rounds, Stewart A.
2016-04-01
A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990-1999) and future (2059-2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam's spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake's surface with cooler water from deep in the lake, and the spillway is an important release point near the lake's surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.
NASA Astrophysics Data System (ADS)
Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.
2017-12-01
The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration. This impact was stronger for younger trees (<200 yr) and for those growing closer to the hydroelectric dam (<100 km distance). Considering the planning of construction of several dozen dams in the Amazon there is an urgent need to consider these downstream impacts in all discussions of hydroelectric power plants implementation and operation.
Anadromous sea lampreys recolonize a Maine coastal river tributary after dam removal
Hogg, Robert; Coghlan, Stephen M.; Zydlewski, Joseph D.
2013-01-01
Sedgeunkedunk Stream, a third-order tributary to the Penobscot River, Maine, historically supported several anadromous fishes, including the Atlantic Salmon Salmo salar, AlewifeAlosa pseudoharengus, and Sea Lamprey Petromyzon marinus. However, two small dams constructed in the 1800s reduced or eliminated spawning runs entirely. In 2009, efforts to restore marine–freshwater connectivity in the system culminated with removal of the lowermost dam, thus providing access to an additional 4.6 km of lotic habitat. Because Sea Lampreys utilized accessible habitat prior to dam removal, they were chosen as a focal species with which to quantify recolonization. During spawning runs of 2008–2011 (before and after dam removal), individuals were marked with PIT tags and their activity was tracked with daily recapture surveys. Open-population mark–recapture models indicated a fourfold increase in the annual abundance of spawning-phase Sea Lampreys, with estimates rising from 59±4 () before dam removal (2008) to 223±18 and 242±16 after dam removal (2010 and 2011, respectively). Accompanying the marked increase in annual abundance was a greater than fourfold increase in nesting sites: the number of nests increased from 31 in 2008 to 128 and 131 in 2010 and 2011, respectively. During the initial recolonization event (i.e., in 2010), Sea Lampreys took 6 d to move past the former dam site and 9 d to expand into the furthest upstream reaches. Conversely, during the 2011 spawning run, Sea Lampreys took only 3 d to penetrate into the upstream reaches, thus suggesting a potential positive feedback in which larval recruitment into the system may have attracted adult spawners via conspecific pheromone cues. Although more research is needed to verify the migratory pheromone hypothesis, our study clearly demonstrates that small-stream dam removal in coastal river systems has the potential to enhance recovery of declining anadromous fish populations.
Draut, Amy E.; Rubin, David M.
2008-01-01
Since the closure of Glen Canyon Dam in 1963, the natural hydrologic and sedimentary systems along the Colorado River in the Grand Canyon reach have changed substantially (see, for example, Andrews, 1986; Johnson and Carothers, 1987; Webb and others, 1999b; Rubin and others, 2002; Topping and others, 2003; Wright and others, 2005; Hazel and others, 2006b). The dam has reduced the fluvial sediment supply at the upstream boundary of Grand Canyon National Park by about 95 percent. Regulation of river discharge by dam operations has important implications for the storage and redistribution of sediment in the Colorado River corridor. In the absence of floods, sediment is not deposited at elevations that regularly received sediment before dam closure. Riparian vegetation has colonized areas at lower elevations than in predam time when annual floods removed young vegetation (Turner and Karpiscak, 1980). Together, these factors have caused a systemwide decrease in the size and number of subaerially exposed fluvial sand deposits since the 1960s, punctuated by episodic aggradation during the exceptional high-flow intervals in 1983-84, 1996, and 2004 and by sediment input from occasional tributary floods (Beus and others, 1985; Schmidt and Graf, 1987; Kearsley and others, 1994; Hazel and others, 1999; Schmidt and others, 2004; Wright and others, 2005). When the Bureau of Reclamation sponsored the creation of the Glen Canyon Environmental Studies (GCES) research initiative in 1982, research objectives included physical and biologic resources, whereas the effects of dam operations on cultural resources were not addressed (Fairley and others, 1994; Fairley, 2003). In the early 1980s, it was widely believed that because few archeologic sites were preserved within the river's annual-flood zone, cultural features would not be greatly affected by dam operations. Recent studies, however, indicate that alterations in the flow and sediment load of the Colorado River by Glen Canyon Dam operations may affect archeologic sites within the river corridor, even above the annual flood limit (Hereford and others, 1993, Yeatts, 1996, 1997; Thompson and Potochnik, 2000; Draut and others, 2005). (The annual-flood zone is defined here by the mean annual predam flood of 2,410 m3/s; the 'predam flood limit', the highest elevation at which fluvial deposits are present locally, was approximately equivalent to a rare, major flood of 8,500 m3/s; Topping and others, 2003.) Of about 500 archeologic sites documented between Glen Canyon Dam and Separation Canyon (255 river miles), more than 330 are considered to be within the area of potential effect (APE) of dam operations (Fairley and others, 1994; Neal and others, 2000; Fairley, 2005). The APE was designated by the National Park Service (NPS) to include the area below the peak stage of the 1884 flood; though previously believed to have reached 8,490 m3/s, this flood was shown by Topping and others (2003) to have peaked at 5,940 m3/s. Archeologic research and monitoring in Grand Canyon National Park focus increasingly on the potential effects of Glen Canyon Dam operations on the landscape in which these sites exist. Many archeologic sites in or on sedimentary deposits are being eroded, owing to eolian deflation and gully incision (Leap and others, 2000; Neal and others, 2000; Fairley, 2003, 2005). Hereford and others (1993) first suggested that gully incision of sedimentary deposits, and the base level to which small drainage systems respond, were linked to dam operations; they hypothesized that pronounced arroyo incision, which occurs during rainfall runoff, was caused by lowering of the effective base level at the mouths of ephemeral drainages to meet the new postdam elevation of high-flow sediment deposition, about 3 to 4 m below the lowest predam alluvial terraces. Thompson and Potochnik (2000) modified that hypothesis to include the restorative effects of fluvial deposition in the mouths of gullies and ar
An environmental streamflow assessment for the Santiam River basin, Oregon
Risley, John C.; Wallick, J. Rose; Mangano, Joseph F.; Jones, Krista L.
2012-01-01
The Santiam River is a tributary of the Willamette River in northwestern Oregon and drains an area of 1,810 square miles. The U.S. Army Corps of Engineers (USACE) operates four dams in the basin, which are used primarily for flood control, hydropower production, recreation, and water-quality improvement. The Detroit and Big Cliff Dams were constructed in 1953 on the North Santiam River. The Green Peter and Foster Dams were completed in 1967 on the South Santiam River. The impacts of the structures have included a decrease in the frequency and magnitude of floods and an increase in low flows. For three North Santiam River reaches, the median of annual 1-day maximum streamflows decreased 42–50 percent because of regulated streamflow conditions. Likewise, for three reaches in the South Santiam River basin, the median of annual 1-day maximum streamflows decreased 39–52 percent because of regulation. In contrast to their effect on high flows, the dams increased low flows. The median of annual 7-day minimum flows in six of the seven study reaches increased under regulated streamflow conditions between 60 and 334 percent. On a seasonal basis, median monthly streamflows decreased from February to May and increased from September to January in all the reaches. However, the magnitude of these impacts usually decreased farther downstream from dams because of cumulative inflow from unregulated tributaries and groundwater entering the North, South, and main-stem Santiam Rivers below the dams. A Wilcox rank-sum test of monthly precipitation data from Salem, Oregon, and Waterloo, Oregon, found no significant difference between the pre-and post-dam periods, which suggests that the construction and operation of the dams since the 1950s and 1960s are a primary cause of alterations to the Santiam River basin streamflow regime. In addition to the streamflow analysis, this report provides a geomorphic characterization of the Santiam River basin and the associated conceptual framework for assessing possible geomorphic and ecological changes in response to river-flow modifications. Suggestions for future biomonitoring and investigations are also provided. This study was one in a series of similar tributary streamflow and geomorphic studies conducted for the Willamette Sustainable Rivers Project. The Sustainable Rivers Project is a national effort by the USACE and The Nature Conservancy to develop environmental flow requirements in regulated river systems.
Lewis, Jason M.; Smith, S. Jerrod; Buck, Stephanie D.; Strong, Scott A.
2011-01-01
An understanding of fluvial sediment transport and changing channel morphology can assist planners in making responsible decisions with future riverine development or restoration projects. Sediment rating curves can serve as simple models and can provide predictive tools to estimate annual sediment fluxes. Sediment flux models can aid in the design of river projects by providing insight to past and potential future sediment fluxes. Historical U.S. Geological Survey suspended-sediment and discharge data were evaluated to estimate annual suspended-sediment fluxes for two stations on the Arkansas River located downstream from Keystone Dam in Tulsa County. Annual suspended-sediment fluxes were estimated from 1931-95 for the Arkansas River at Tulsa streamflow-gaging station (07164500) and from 1973-82 for the Arkansas River near Haskell streamflow-gaging station (07165570). The annual flow-weighted suspended-sediment concentration decreased from 1,970 milligrams per liter to 350 milligrams per liter after the completion of Keystone Dam at the Tulsa station. The streambed elevation at the Arkansas River at Tulsa station has changed less than 1 foot from 1970 to 2005, but the thalweg has shifted from a location near the right bank to a position near the left bank. There was little change in the position of most of the banks of the Arkansas River channel from 1950 to 2009. The most substantial change evident from visual inspection of aerial photographs was an apparent decrease in sediment storage in the form of mid-channel and meander bars. The Arkansas River channel between Keystone Dam and the Tulsa-Wagoner County line showed a narrowing and lengthening (increase in sinuosity) over the transition period 1950-77 followed by a steady widening and shortening of the river channel (decrease in sinuosity) during the post-dam (Keystone) periods 1977-85, 1985-2003, and 2003-10.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... & Marketing, Southeastern Power Administration, U.S. Department of Energy, 1166 Athens Tech Road, Elberton...,000 MWh of average annual energy to 25 preference entities that serve 210 preference customers in... customers while the Wolf Creek and Center Hill dam safety repairs are finalized. The Wolf Creek Dam work is...
NASA Astrophysics Data System (ADS)
Li, Zhenwei; Xu, Xianli; Xu, Chaohao; Liu, Meixian; Wang, Kelin
2018-03-01
Southwest China, as one of the largest continuous karst areas in the world, is a severely eroded region due to its special geological condition. Thus, soil and water conservation measures such as dam construction have been extensively implemented in this region to control sediment delivery. However, it remains unclear how dam construction affects multiscale variability of sediment discharge (SD) and its potentially influential factors in southwest China. To assess this, annual SD, water discharge (WD), precipitation (PT), potential evapotranspiration (PET), and normalized differential vegetation index (NDVI) data from 1955 to 2015 were obtained from two karst watersheds of Liujiang (no large dams) and Hongshui (dam-controlled). These sites shared the similar climatic conditions. The Mann-Kendal test, Wilcoxon rank-sum test, and continuous wavelet transform analysis was used to detect the trends and periodicity in SD, and wavelet coherence analysis were employed to detect the temporal covariance between SD and WD, PT, PET, and NDVI. Results indicated that the multiscale variability of SD was strongly influenced by dam construction. The annual SD showed significant 4-year periodic oscillation in the Liujiang watershed, while no significant cycles were found in the Hongshui watershed. Dam construction exerted substantial influence on the multiscale correlations between SD and its associated factors. The time scales that the NDVI resonated with SD were concentrated on the periodicity of 2- and 3-year in the Liujiang watershed. In contrast, no significant periodicities were observed in the Hongshu watershed. This study yields a greater understanding of SD dynamics, and is helpful for better watershed management in karst areas of southwest China.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muir, William D.
1995-02-01
In 1994, the National Marine Fisheries Service and the University of Washington completed the second year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through the dams and reservoirs of the Snake River. Actively migrating smolts were collected at selected locations above, at, and below Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Survival estimates were calculated using the Single-Release, Modified Single-Release, and Paired-Release Models.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-17
... Natural Resources and impounds a 553-acre reservoir at a normal pool elevation of 472.2 North American... the existing Williams dam owned by the Indiana Department of Natural Resources on the East Fork White... maintained at the existing normal pool elevation (crest of the dam spillway) or above. The average annual...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Chuck; Scofield, Ben; Pavlik, Deanne
2003-03-01
A slightly dryer than normal year yielded flows in Lake Roosevelt that were essentially equal to the past ten year average. Annual mean inflow and outflow were 3,160.3 m3/s and 3,063.4 m3/s respectively. Mean reservoir elevation was 387.2 m above sea level at the Grand Coulee Dam forebay. The forebay elevation was below the mean elevation for a total of 168 days. During the first half of the 2000 forebay elevation changed at a rate of 0.121 m/d and during the last half changed at a rate of 0.208 m/d. The higher rate of elevation change earlier in the yearmore » is due to the drawdown to accommodate spring runoff. Mean annual water retention time was 40 days. Annual mean total dissolved gas was 108%. Total dissolved gas was greatest at upriver locations (110% = US/Canada Border annual mean) and decreased moving toward Grand Coulee Dam (106% = Grand Coulee Dam Forebay annual mean). Total dissolved gas was greatest in May (122% reservoir wide monthly mean). Gas bubble trauma was observed in 16 fish primarily largescale suckers and was low in severity. Reservoir wide mean temperatures were greatest in August (19.5 C) and lowest in January (5.5 C). The Spokane River and Sanpoil River Arms experienced higher temperatures than the mainstem reservoir. Brief stratification was observed at the Sanpoil River shore location in July. Warm water temperatures in the Spokane Arm contributed to low dissolved oxygen concentrations in August (2.6 mg/L at 33 m). However, decomposition of summer algal biomass was likely the main cause of depressed dissolved oxygen concentrations. Otherwise, dissolved oxygen profiles were relatively uniform throughout the water column across other sampling locations. Annual mean Secchi depth throughout the reservoir was 5.7 m. Nutrient concentrations were generally low, however, annual mean total phosphorus (0.016 mg/L) was in the mesotrophic range. Annual mean total nitrogen was in the meso-oligotrophic range. Total nitrogen to total phosphorus ratios were large (31:1 annual mean) likely indicating phosphorus limitations to phytoplankton.« less
NASA Astrophysics Data System (ADS)
Kondolf, G. M.; Oreilly, C.
2010-12-01
Water-supply reservoirs in the actively eroding California Coast Ranges are vulnerable to sediment filling, thus creating obsolete impounding dams (Minear & Kondolf 2009). Once full of sediment, there is more impetus to remove dams for public safety and fish passage, but managing accumulated sediments becomes a dominant issue in dam removal planning. We analyzed the planning process and sediment management analyses for five dams, all of which have important ecological resources but whose dam removal options are constrained by potential impacts to downstream urban populations. Ringe Dam on Malibu Ck, Matilija Dam on the Ventura River, Searsville Dam on San Francisquito Ck, and Upper York Creek Dam on York Ck cut off important habitat for anadromous steelhead trout (Oncorhynchus mykiss). San Clemente Dam on the Carmel River has a working fish ladder, but only some of the migratory steelhead use it. By virtue of having filled with sediment, all five dams are at greater risk of seismic failure. San Clemente Dam is at greater risk because its foundation is on alluvium (not bedrock), and the poor-quality concrete in Matilija Dam is deteriorating from an akali-aggregate reaction. Simply removing the dams and allowing accumulated sediments to be transported downstream is not an option because all these rivers have extremely expensive houses along downstream banks and floodplains, so that allowing the downstream channel to aggrade with dam-dervied sediments could expose agencies to liability for future flood losses. Analyses of potential sediment transport have been based mostly on application of tractive force models, and have supported management responses ranging from in-situ stabilization (San Clemente and Matilija) to removal of stored sediment (York) to annual dredging to maintain capacity and prevent sediment passing over the dam (proposed for Searsville).
Sarah J. Kupferberg; Wendy J. Palen; Amy J. Lind; Steve Bobzien; Alessandro Catenazzi; Joe Drennan; Mary. Power
2012-01-01
Widespread alteration of natural hydrologic patterns by large dams combined with peak demands for power and water delivery during summer months have resulted in frequent aseasonal flow pulses in rivers of western North America. Native species in these ecosystems have evolved with predictable annual flood-drought cycles; thus, their likelihood of persistence may...
Perry, R.W.; Farley, M.J.; Hansen, G.S.; Shurtleff, D.J.; Rondorf, D.W.; LeCaire, R.
2003-01-01
In 1995, the Chief Joseph Kokanee Enhancement Project was established to mitigate the loss of anadromous fish due to the construction of Chief Joseph and Grand Coulee dams. The objectives of the Chief Joseph Enhancement Project are to determine the status of resident kokanee (Oncorhynchus nerka) populations above Chief Joseph and Grand Coulee dams and to enhance kokanee and rainbow trout (Oncorhynchus mykiss) populations. Studies conducted at Grand Coulee Dam documented substantial entrainment of kokanee through turbines at the third powerhouse.
Water clarity of the Colorado River—Implications for food webs and fish communities
Voichick, Nicholas; Kennedy, Theodore A.; Topping, David; Griffiths, Ronald; Fry, Kyrie
2016-11-01
The closure of Glen Canyon Dam in 1963 resulted in drastic changes to water clarity, temperature, and flow of the Colorado River in Glen, Marble, and Grand Canyons. The Colorado River is now much clearer, water temperature is less variable throughout the year, and the river is much colder in the summer months. The flow—regulated by the dam—is now less variable annually, but has larger daily fluctuations than during pre-dam times. All of these changes have resulted in a different fish community and different food resources for fish than existed before the dam was built. Recent monitoring of water clarity, by measuring turbidity, has helped scientists and river managers understand modern water-clarity patterns in the dam-regulated Colorado River. These data were then used to estimate pre-dam turbidity in the Colorado River in order to make comparisons of pre-dam and dam-regulated conditions, which are useful for assessing biological changes in the river over time. Prior to dam construction, the large sediment load resulted in low water clarity almost all of the time, a condition which was more favorable for the native fish community.
Riparian Vegetation Encroachment Ratios in rivers below large Dams
NASA Astrophysics Data System (ADS)
Garcia de Jalón, Diego; Martínez-Fernández, Vanesa; González del Tánago, Marta
2017-04-01
Large Dams and reservoirs change the natural flow regime and consequently cause many alterations in riparian vegetation dynamics which may be assessed at different spatial and temporal scales. In Mediterranean regions flow regulation is frequently associated with irrigation. Regulated rivers with this purpose very often show reduced discharges during the wet season when the reservoir is being filled and increased discharges during the dry season when irrigation takes place. This type of regulation frequently promotes riparian vegetation growth as soil moisture levels are increased during summer when a natural drought would otherwise limit its growth. Additionally, flow regulation by large dams promotes the aging of late seral riparian vegetation reducing the frequency of flood disturbance and consequently, the potential recruitment of pioneer species. In this work we study the response of woody riparian vegetation to flow regulation by large dams in four rivers from Central Spain: Jarama, Manzanares, Guadalix and Alberche. The aim is to quantify the annual vegetation encroachment ratios and to develop a model to understand the main controlling factors, such as floodplain and channel traits; flow regulation intensity; type of regulation; present vegetation canopy; distance to the dam; and time since dam commissioning. A temporal comparison using aerial photographs from 1956, 1966, 1972, 1991, 2011 and 2014 was done in thirteen river reaches downstream from large dams, to evaluate their morphological evolution.. Floodplain dimensions and channel and riparian vegetation changes were assessed by comparing different pre-dam and post-dam conditions. Recent coloured photographs with 0.5 m spatial resolution and older black-and-white photographs at 1:33 000 spatial scale were supplied by the National Geographic Institute of Spain (www.ign.es) and the Statistical Institute (www.madrid.org/nomecalles/Inicio.icm) from Madrid Community. Similar visual scales were used to cope with different air photographs resolution. Results show a generalized natural vegetation encroachment process. Two exceptions were found associated with farming (Jarama 3) and poplar plantation (Alberche 1) that occupied riparian soils.. Annual encroachment ratios, range from 1 to 55 Ha/km, with a mean value of 12 Ha per km of river length. Higher values are found in the lowest reaches, which are far from the dam (5 cases), and also in the years following the beginning of dam operation. However, other reaches showed a delay of several years in the encroaching process, likely associated to scarcity or absence of initial woody vegetation at the time when dam started working.
NASA Astrophysics Data System (ADS)
LI, E.; Li, D.; Wang, Y.; Fu, X.
2017-12-01
The Yellow River is well known for its high sediment load and serious water shortage. The long-term averaged sediment load is about 1.6´103 million tons per year, resulting in aggrading and perched lower reaches. In recent years, however, dramatic decreases in runoff and sediment load have been observed. The annual sediment load has been less than 150 million tons in the last ten years. Extrapolation of this trend into the future would motivate substantial change in the management strategies of the Lower Yellow River. To understand the possible trend and its coevolving drivers, we performed a case study of the Huangfuchuang River, which is a tributary to the Middle Yellow River, with a drainage area of 3246 km2 and an annual precipitation of 365 mm. Statistical analysis of historical data from 1960s to 2015 showed a significantly decreasing trend in runoff and sediment load since 1984. As potential drivers, the precipitation does not show an obvious change in annual amount, while the vegetation cover and the number of check dams have been increased gradually as a result of the national Grain for Green project. A simulation with the Soil and Water Assessment Tool (SWAT) reproduced the historical evolution processes, and showed that human activities dominated the reduction in runoff and sediment load, with a contribution of around 80%. We then projected the runoff and sediment load for the next 50 years (2016-2066), considering typical scenarios of climate change and accounting for vegetation cover development subject to climate conditions and storage capacity loss of check dams due to sediment deposition. The differences between the projected trend and the historical record were analyzed, so as to highlight the coevolving processes of climate, vegetation, and check dam retention on a time scale of decades. Keywords: Huangfuchuan River Basin, sediment load, vegetation cover, check dams, annual precipitation, SWAT.
[Quality assurance in airway management: education and training for difficult airway management].
Kaminoh, Yoshiroh
2006-01-01
Respiratory problem is one of the main causes of death or severe brain damage in perioperative period. Three major factors of respiratory problem are esophageal intubation, inadequate ventilation, and difficult airway. The wide spread of pulse oximeter and capnograph reduced the incidences of esophageal intubation and inadequate ventilation, but the difficult airway still occupies the large portion in the causes of adverse events during anesthesia. "Practice guideline for management of the difficult airway" was proposed by American Society of Anesthesiologists (ASA) in 1992 and 2002. Improvement of knowledge, technical skills, and cognitive skills are necessary for the education and training of the difficult airway management. "The practical seminar of difficult airway management (DAM practical seminar)" has been cosponsored by the Japanese Association of Medical Simulation (JAMS) in the 51 st and 52 nd annual meetings of Japanese Society of Anesthesiologists and the 24th annual meeting of Japanese Society for Clinical Anesthesia. The DAM practical seminar is composed of the lecture session for ASA difficult airway algorithm, the hands-on training session for technical skills, and the scenario-based training session for cognitive skills. Ninty six Japanese anesthesiologists have completed the DAM practical seminar in one year. "The DAM instructor course" should be immediately prepared to organize the seminar more frequently.
Local response of a glacier to annual filling and drainage of an ice-marginal lake
Walder, J.S.; Trabant, D.C.; Cunico, M.; Fountain, A.G.; Anderson, S.P.; Anderson, R. Scott; Malm, A.
2006-01-01
Ice-marginal Hidden Creek Lake, Alaska, USA, outbursts annually over the course of 2-3 days. As the lake fills, survey targets on the surface of the 'ice dam' (the glacier adjacent to the lake) move obliquely to the ice margin and rise substantially. As the lake drains, ice motion speeds up, becomes nearly perpendicular to the face of the ice dam, and the ice surface drops. Vertical movement of the ice dam probably reflects growth and decay of a wedge of water beneath the ice dam, in line with established ideas about jo??kulhlaup mechanics. However, the distribution of vertical ice movement, with a narrow (50-100 m wide) zone where the uplift rate decreases by 90%, cannot be explained by invoking flexure of the ice dam in a fashion analogous to tidal flexure of a floating glacier tongue or ice shelf. Rather, the zone of large uplift-rate gradient is a fault zone: ice-dam deformation is dominated by movement along high-angle faults that cut the ice dam through its entire thickness, with the sense of fault slip reversing as the lake drains. Survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. The horizontal strain rate also undergoes a reversal across this zone, being compressional as the lake fills, but extensional as the lake drains. Frictional resistance to fault-block motion probably accounts for the fact that lake level falls measurably before the onset of accelerated horizontal motion and vertical downdrop. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.
NASA Astrophysics Data System (ADS)
Chapman, K.; Parnell, R. A.; Smith, M. E.; Grams, P. E.; Mueller, E. R.
2015-12-01
The 1963 closure of Glen Canyon Dam drastically reduced the downstream sediment supply and altered daily flow regimes of the Colorado River through Grand Canyon, resulting in significant sandbar erosion downstream of the dam. Dam-release floods, known as High Flow Experiments (HFEs), have occurred six times since 1996 and are intended to rebuild Grand Canyon sandbars using tributary-supplied sediment. In Marble Canyon (first 100 km of Grand Canyon) the targeted tributary is the Paria River which supplies approximately 90% of the annual suspended sediment flux through Marble Canyon; the same input contributed less than 6% prior to the dam. Annual topographic surveys have established that HFEs are effective at rebuilding sandbars. However, the long-term viability of using HFEs for sandbar maintenance is dependent on a sustainable source of sediments comprising HFE deposits. Significant use of non-tributary, main-stem sediments (i.e. pre-dam sand stored in eddies or the channel bed) in HFE deposits would indicate reliance on a limited resource, and diminishing returns in the ability of HFEs to rebuild sandbars. In this study, we sampled vertically throughout 12 bars in Marble Canyon to document temporal and downstream changes in the proportion of sediment sourced from the Paria River during the 2013 and 2014 HFEs. Preliminary data suggest that heavy mineral compositions and concentrations of Ti, S, Cr and Rb, all of which are influenced by grainsize, could be sufficiently capable of differentiating Paria-derived and main-stem sediments when combined into a composite fingerprint (CF). A multivariate mixing model using these CFs quantitatively determines the contribution of Paria-derived sediment in each HFE deposit sample. Mixing model endmembers for non-Paria sand include pre-dam flood deposits in Glen and Marble Canyons, and Marble Canyon dredge samples. These results elucidate the role of contemporary versus legacy sediment in long-term sandbar maintenance.
19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN ...
19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Anthropogenic controls on geomorphic evolution of the Upper Missouri River
NASA Astrophysics Data System (ADS)
Benthem, A.; Skalak, K.; Schenk, E.; Hupp, C.; Galloway, J.; Nustad, R.
2012-12-01
The 70-mile free flowing Upper Missouri River reach is bounded upstream by the Garrison Dam and downstream by Lake Oahe. The Garrison Dam, which regulates flow into the reach, was completed in 1953; the Oahe Dam (which created Lake Oahe and the associated delta near Bismarck, ND) was completed in 1959. This reach is used for recreation, water supply, fisheries, and as habitat for threatened and endangered species. The Upper Missouri River regularly (approximately every two years) received annual peak flows above 100,000 cubic feet per second (cfs) prior to the completion of the Garrison Dam. Annual peak flows consistently have been between 30,000 and 45,000 cfs following dam completion. The largest flood since dam regulation occurred in 2011 following an abnormally high snow pack season and a week-long rain event in the headwaters. Flood releases from the Garrison Dam began in May 2011 and peaked in June with a flow of approximately 150,000 cfs. The peak flow was sustained for two weeks. The dam releases have had a discernible impact on the Missouri River throughout this section. The 2011 flood has highlighted the critical need for quantifying the complex interaction between the regional geomorphology and human activities. It is necessary to first understand and quantify the historical impacts of the dams in order to determine the impact of the 2011 flood on channel planform, morphology, and sediment dynamics. We have created a spatial-temporal conceptual model of the governing fluvial and deltaic processes for the reach. Methods used for the development of the conceptual model include interpretation of repeat aerial photography, historical streamgage data, historical cross-sectional surveys, in addition to ground-truthing data with sediment cores, channel surveys, and dendrogeomorphic tools. Preliminary results indicate that prior to the 2011 flood the reach had achieved a dynamic equilibrium in response to dam closure and subsequent managed flows. The perturbation from the dam closure attenuated over approximately a 30-year period. Cross-sectional analysis indicates the reach just below the Garrison Dam increased in capacity over this period and the lower end of the reach (just upstream of the delta) either maintained capacity or experienced a reduction. Analysis of channel planform through repeat aerial photography suggests channel adjustment of varying types and degrees. Loss of islands and erosion has occurred in the 20 miles just below the dam; the next 30 miles have generally remained metastable and many islands in the remaining 20 miles of the river have become bank-attached. Loss of conveyance and increased frequency and growth of islands has occurred in the delta above the reservoir. However, the Upper Missouri River is still responding to the historic flood of 2011 and analysis is ongoing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A
2014-01-01
Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects ofmore » local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at large spatial scales as to generalize the directionality of hydrologic responses.« less
Origin of the Colorado River experimental flood in Grand Canyon
Andrews, E.D.; Pizzi, L.A.
2000-01-01
The Colorado River is one of the most highly regulated and extensively utilized rivers in the world. Total reservoir storage is approximately four times the mean annual runoff of ~17 x 109 m3 year -1. Reservoir storage and regulation have decreased annual peak discharges and hydroelectric power generation has increased daily flow variability. In recent years, the incidental impacts of this development have become apparent especially along the Colorado River through Grand Canyon National Park downstream from Glen Canyon Dam and caused widespread concern. Since the completion of Glen Canyon Dam, the number and size of sand bars, which are used by recreational river runners and form the habitat for native fishes, have decreased substantially. Following an extensive hydrological and geomorphic investigation, an experimental flood release from the Glen Canyon Dam was proposed to determine whether sand bars would be rebuilt by a relatively brief period of flow substantially greater than the normal operating regime. This proposed release, however, was constrained by the Law of the River, the body of law developed over 70 years to control and distribute Colorado River water, the needs of hydropower users and those dependent upon hydropower revenues, and the physical constraints of the dam itself. A compromise was reached following often difficult negotiations and an experimental flood to rebuild sand bars was released in 1996. This flood, and the process by which it came about, gives hope to resolving the difficult and pervasive problem of allocation of water resources among competing interests.The Colorado River is one of the most highly regulated and extensively utilized rivers in the world. Total reservoir storage is approximately four times the mean annual runoff of approximately 17??109 m3 year-1. Reservoir storage and regulation have decreased annual peak discharges and hydroelectric power generation has increased daily flow variability. In recent years, the incidental impacts of this development have become apparent especially along the Colorado River through Grand Canyon National Park downstream from Glen Canyon Dam and caused widespread concern. Since the completion of Glen Canyon Dam, the number and size of sand bars, which are used by recreational river runners and form the habitat for native fishes, have decreased substantially. Following an extensive hydrological and geomorphic investigation, an experimental flood release from the Glen Canyon Dam was proposed to determine whether sand bars would be rebuilt by a relatively brief period of flow substantially greater than the normal operating regime. This proposed release, however, was constrained by the Law of the River, the body of law developed over 70 years to control and distribute Colorado River water, the needs of hydropower users and those dependent upon hydropower revenues, and the physical constraints of the dam itself. A compromise was reached following often difficult negotiations and an experimental flood to rebuild sand bars was released in 1996. This flood, and the process by which it came about, gives hope to resolving the difficult and pervasive problem of allocation of water resources among competing interests.
NASA Astrophysics Data System (ADS)
Magirl, C. S.; Ritchie, A.; Bountry, J.; Randle, T. J.; East, A. E.; Hilldale, R. C.; Curran, C. A.; Pess, G. R.
2015-12-01
The 2011-2014 staged removals of two nearly century-old dams on the Elwha River in northwest Washington State, the largest dam-removal project in the United States, exposed 21 million m3 of reservoir-trapped sand and gravel to potential fluvial transport. The river downstream from the dams is gravel bedded with a pool-riffle morphology. The river flows 20 km to the marine environment through a riparian corridor lined with large wood and having relatively few anthropogenic alterations. This moderately natural pre-dam-removal condition afforded an unprecedented opportunity to study river response to an anticipated massive sediment release. Four years into the project, 12 million m3 of sediment eroded from the former reservoirs with about 90% of the total load transported to the marine environment. Annualized sediment discharge was as great as 20 times the background natural load. Initial river response to the arrival of the first large sediment pulse was the nearly complete filling of the river's previously sediment-starved pools, widespread filling of side channels, and increased braiding index. In year 2, during maximum aggradation, the river graded to a plane-bedded system, efficiently conveying sediment to the marine environment. Modest peak flows (<2-yr return period) in year 2 promoted sediment transport but caused little large-scale geomorphic disturbance by channel migration or avulsions. As the river processed the sediment pulse, pools returned and the braiding index decreased in years 3-4. Higher peak flows in year 4 caused localized channel widening and migration but no major avulsions. Gauging indicated sand dominated the first stages of sediment release, but fluvial loads coarsened through time with progressive arrival of larger material. The literature suggests the Elwha River sediment wave should have evolved through dispersion with little translation. However, morphologic measurements and data from a stage-gauge network indicated patterns of deposition, sediment transport, and sediment-wave evolution were heterogeneously complex, challenging our efforts to classify the sediment wave in terms of simple dispersion or translation.
NASA Astrophysics Data System (ADS)
Ho, M. W.; Devineni, N.; Cook, E. R.; Lall, U.
2017-12-01
As populations and associated economic activity in the US evolve, regional demands for water likewise change. For regions dependent on surface water, dams and reservoirs are critical to storing and managing releases of water and regulating the temporal and spatial availability of water in order to meet these demands. Storage capacities typically range from seasonal storage in the east to multi-annual and decadal-scale storage in the drier west. However, most dams in the US were designed with limited knowledge regarding the range, frequency, and persistence of hydroclimatic extremes. Demands for water supplied by these dams have likewise changed. Furthermore, many dams in the US are now reaching or have already exceeded their economic design life. The converging issues of aging dams, improved knowledge of hydroclimatic variability, and evolving demands for dam services result in a pressing need to evaluate existing reservoir capacities with respect to contemporary water demands, long term hydroclimatic variability, and service reliability into the future. Such an effort is possible given the recent development of two datasets that respectively address hydroclimatic variability in the conterminous United States over the past 555 years and human water demand related water stress over the same region. The first data set is a paleoclimate reconstruction of streamflow variability across the CONUS region based on a tree-ring informed reconstruction of the Palmer Drought Severity Index. This streamflow reconstruction suggested that wet spells with shorter drier spells were a key feature of 20th century streamflow compared with the preceding 450 years. The second data set in an annual cumulative drought index that is a measure of water balance based on water supplied through precipitation and water demands based on evaporative demands, agricultural, urban, and industrial demands. This index identified urban and regional hotspots that were particularly dependent on water transfers and vulnerable to persistent drought risk. These data sets are used in conjunction with the national inventory of dams to assess the current capacity of dams to meet water demands considering variability in streamflow over the past 555 years. A case study in the North-East US is presented.
Wehmeyer, Loren L.; Bales, Jerad D.
2009-01-01
Understanding the relation between dam release characteristics and downstream water quality in the lower Roanoke River, North Carolina, is important for natural-resource management and ecosystem protection. Data from four raingages, four water-quality monitoring sites, and one streamflow-measurement site were used to identify statistical relations and discernible quantitative or qualitative patterns linking Roanoke River instream dissolved-oxygen (DO) levels to releases at Roanoke Rapids Dam for the period 1998-2005. The time-series DO data, complicated by the occurrence of major hurricanes in the short period of hourly DO data collection at the dam, present a mixed picture of the effects of hydropower peaking (a technique used by hydropower dam operators to produce electricity when consumption is high by passing a large volume of water through the dam turbines, which dramatically increases the volume of flow below the dam) on downstream DO. Other than in 2003 when dissolved-oxygen concentrations in the Roanoke River were likely affected by runoff from Hurricane Isabel rains, there were not consistent, statistically significant differences detected in the annual medians of hourly and(or) daily DO values during peaking versus nonpeaking periods. Along the Roanoke River, downstream of Roanoke Rapids Dam at Oak City, North Carolina, using a 95-percent confidence interval, the median value of the May-November daily mean DO concentrations for each year was lower during peaking periods for 2 years, higher for 2 years, and not significantly different for 4 years. Downstream at Jamesville, North Carolina, also using a 95-percent confidence interval, the median value of the annual May-November daily mean DO concentrations during hydropower peaking was lower for 4 years, higher for 2 years, and not significantly different for 2 years. In summary, the effect of hydropower peaking on downstream DO was inconsistent. Conversely, large precipitation events downstream from the dam resulted in consistent, statistically significant decreases in DO in the mainstem of the Roanoke River at Oak City and Jamesville.
Kennedy, T.A.; Ralston, B.E.
2012-01-01
Dams and associated river regulation have led to the expansion of riparian vegetation, especially nonnative species, along downstream ecosystems. Nonnative saltcedar is one of the dominant riparian plants along virtually every major river system in the arid western United States, but allochthonous inputs have never been quantified along a segment of a large river that is dominated by saltcedar. We developed a novel method for estimating direct allochthonous inputs along the 387km-long reach of the Colorado River downstream of Glen Canyon Dam that utilized a GIS vegetation map developed from aerial photographs, empirical and literature-derived litter production data for the dominant vegetation types, and virtual shorelines of annual peak discharge (566m 3s -1 stage elevation). Using this method, we estimate that direct allochthonous inputs from riparian vegetation for the entire reach studied total 186metric tonsyear -1, which represents mean inputs of 470gAFDMm -1year -1 of shoreline or 5.17gAFDMm -2year -1 of river surface. These values are comparable to allochthonous inputs for other large rivers and systems that also have sparse riparian vegetation. Nonnative saltcedar represents a significant component of annual allochthonous inputs (36% of total direct inputs) in the Colorado River. We also estimated direct allochthonous inputs for 46.8km of the Colorado River prior to closure of Glen Canyon Dam using a vegetation map that was developed from historical photographs. Regulation has led to significant increases in riparian vegetation (270-319% increase in cover, depending on stage elevation), but annual allochthonous inputs appear unaffected by regulation because of the lower flood peaks on the post-dam river. Published in 2010 by John Wiley & Sons, Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William
1992-04-01
The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.
21. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
21. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, UPSTREAM SIDE FROM SOUTH END, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
20. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
20. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, BRIDGE FROM SOUTH END, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronson, James P.; Loffink, Ken; Duke, Bill
Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelheadmore » and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.« less
Macek-Rowland, Kathleen M.
2000-01-01
Annual suspended-sediment loads for water years 1954 through 1998 were estimated for the major tributaries in the Missouri River Basin between Garrison Dam and Lake Oahe in North Dakota and for the Missouri River at Garrison Dam and the Missouri River at Bismarck, N. Dak. The major tributaries are the Knife River, Turtle Creek, Painted Woods Creek, Square Butte Creek, Burnt Creek, Heart River, and Apple Creek. Sediment and streamflow data used to estimate the suspended-sediment loads were from selected U.S. Geological Survey streamflow-gaging stations located within each basin. Some of the stations had no sediment data available and limited continuous streamflow data for water years 1954 through 1998. Therefore, data from nearby streamflow-gaging stations were assumed for the calculations. The Heart River contributed the largest amount of suspended sediment to the Missouri River for 1954-98. Annual suspended-sediment loads in the Heart River near Mandan ranged from less than 1 to 40 percent of the annual suspended-sediment load in the Missouri River. The Knife River contributed the second largest amount of suspended sediment to the Missouri River. Annual suspended-sediment loads in the Knife River at Hazen ranged from less than 1 to 19 percent of the annual suspended-sediment load in the Missouri River. Apple Creek, Turtle Creek, Painted Woods Creek, Square Butte Creek, and Burnt Creek all contributed 2 percent or less of the annual suspended-sediment load in the Missouri River. The Knife River and the Heart River also had the largest average suspended-sediment yields for the seven tributaries. The yield for the Knife River was 91.1 tons per square mile, and the yield for the Heart River was 133 tons per square mile. The remaining five tributaries had yields of less than 24 tons per square mile based on total drainage area.
McNary Dam, Ice Harbor Dam, and Lower Monumental Dam Smolt Monitoring Program; 1996 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillson, Todd; Lind, Sharon; Price, William
1997-07-01
The Washington Department of Fish & Wildlife (WDFW) assumed responsibility for the Smolt Monitoring Program at McNary Dam on the Columbia River in 1990 and at the new juvenile collection facility at Lower Monumental Dam on the Snake River in 1993. In 1996, Smolt Monitoring Program activities also began at the new juvenile collection facility located at Ice Harbor Dam. This report summarizes the 1996 Smolt Monitoring work at all three sites. The work at Ice Harbor consisted of Gas Bubble Trauma (GBT) monitoring only. In general, the 1996 passage season at both the McNary and Lower Monumental sites canmore » be characterized by reduced passage of juveniles through the collection systems due to elevated river flows and spill, and low (<1%) overall facility mortality rates most likely resulting from cooler water temperatures. In accordance with the National Marine Fisheries Service recommendations (NMFS, 1995) all spring migrants were bypassed at McNary Dam in 1996. Mechanical problems within the McNary collection system resulted in collection and sampling activities being delayed until April 18 at this site, while sampling and collection began on the scheduled starting date of April 1 at Lower Monumental Dam. Monitoring operations were conducted through December 14 at McNary Dam and through October 28 at Lower Monumental Dam. An ongoing transportation evaluation summer migrant marking program was conducted at McNary Dam in 1996 by the NMFS. This necessitated the sampling of 394,211 additional fish beyond the recommended sampling guidelines. All total, 509,237 and 31,219 juvenile salmonids were anesthetized and individually counted, examined for scale loss, injuries, and brands by WDFW Smolt Monitoring personnel in 1996 at McNary Dam and Lower Monumental Dam, respectively.« less
DISCHARGE AND DEPTH BEHIND A PARTIALLY BREACHED DAM.
Chen, Cheng-lung
1987-01-01
The role that the velocity-distribution correction factor plays in the determination of the flood discharge and corresponding flow depth behind a partially breached dam is investigated. Assumption of a uniformly progressive flow for an established dam-break flood in a rectangular channel of infinite extent leads to the formulation of a theoretical relation between the depth and velocity of flow expressed in differential form. Integrating this ordinary differential equation, one can express the velocity in terms of the depth.
NASA Astrophysics Data System (ADS)
Tundu, Colleta; Tumbare, Michael James; Kileshye Onema, Jean-Marie
2018-04-01
Sediment delivery into water sources and bodies results in the reduction of water quantity and quality, increasing costs of water purification whilst reducing the available water for various other uses. The paper gives an analysis of sedimentation in one of Zimbabwe's seven rivers, the Mazowe Catchment, and its impact on water quality. The Revised Universal Soil Loss Equation (RUSLE) model was used to compute soil lost from the catchment as a result of soil erosion. The model was used in conjunction with GIS remotely sensed data and limited ground observations. The estimated annual soil loss in the catchment indicates soil loss ranging from 0 to 65 t ha yr-1. Bathymetric survey at Chimhanda Dam showed that the capacity of the dam had reduced by 39 % as a result of sedimentation and the annual sediment deposition into Chimhanda Dam was estimated to be 330 t with a specific yield of 226 t km-2 yr-1. Relationship between selected water quality parameters, TSS, DO, NO3, pH, TDS, turbidity and sediment yield for selected water sampling points and Chimhanda Dam was analyzed. It was established that there is a strong positive relationship between the sediment yield and the water quality parameters. Sediment yield showed high positive correlation with turbidity (0.63) and TDS (0.64). Water quality data from Chimhanda treatment plant water works revealed that the quality of water is deteriorating as a result of increase in sediment accumulation in the dam. The study concluded that sedimentation can affect the water quality of water sources.
Juvenile Radio-Tag Study: Lower Granite Dam, 1985 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stuehrenberg, Lowell C.
The concept of using mass releases of juvenile radio tags represents a new and potentially powerful research tool that could be effectively applied to juvenile salmonid passage problems at dams on the Columbia and Snake Rivers. A system of detector antennas, strategically located, would automatically detect and record individually tagged juvenile salmonids as they pass through the spillway, powerhouse, bypass system, or tailrace areas below the dam. Accurate measurements of spill effectiveness, fish guiding efficiency (FGE), collection efficiency (CE), spillway survival, powerhouse survival, and bypass survival would be possible without handling large numbers of unmarked fish. A prototype juvenile radio-tagmore » system was developed and tested by the National Marine Fisheries Service (NMFS) and Bonneville Power Administration (BPA) at John Day Dam and at Lower Granite Dam. This report summarizes research to: (1) evaluate the effectiveness of the prototype juvenile radio-tag system in a field situation and (2) to test the basic assumptions inherent in using the juvenile radio tag as a research tool.« less
Simulating future water temperatures in the North Santiam River, Oregon
Buccola, Norman; Risley, John C.; Rounds, Stewart A.
2016-01-01
A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990–1999) and future (2059–2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam’s spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake’s surface with cooler water from deep in the lake, and the spillway is an important release point near the lake’s surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.
Estimates of Sediment Load Prior to Dam Removal in the Elwha River, Clallam County, Washington
Curran, Christopher A.; Konrad, Christopher P.; Higgins, Johnna L.; Bryant, Mark K.
2009-01-01
Years after the removal of the two dams on the Elwha River, the geomorphology and habitat of the lower river will be substantially influenced by the sediment load of the free-flowing river. To estimate the suspended-sediment load prior to removal of the dams, the U.S. Geological Survey collected suspended-sediment samples during water years 2006 and 2007 at streamflow-gaging stations on the Elwha River upstream of Lake Mills and downstream of Glines Canyon Dam at McDonald Bridge. At the gaging station upstream of Lake Mills, discrete samples of suspended sediment were collected over a range of streamflows including a large peak in November 2006 when suspended-sediment concentrations exceeded 7,000 milligrams per liter, the highest concentrations recorded on the river. Based on field measurements in this study and from previous years, regression equations were developed for estimating suspended-sediment and bedload discharge as a function of streamflow. Using a flow duration approach, the average total annual sediment load at the gaging station upstream of Lake Mills was estimated at 327,000 megagrams with a range of uncertainty of +57 to -34 percent (217,000-513,000 megagrams) at the 95 percent confidence level; 77 percent of the total was suspended-sediment load and 23 percent was bedload. At the McDonald Bridge gaging station, daily suspended-sediment samples were obtained using an automated pump sampler, and concentrations were combined with the record of streamflow to calculate daily, monthly, and annual suspended-sediment loads. In water year 2006, an annual suspended-sediment load of 49,300 megagrams was determined at the gaging station at McDonald Bridge, and a load of 186,000 megagrams was determined upstream at the gaging station upstream of Lake Mills. In water year 2007, the suspended-sediment load was 75,200 megagrams at McDonald Bridge and 233,000 megagrams upstream of Lake Mills. The large difference between suspended-sediment loads at both gaging stations shows the extent of sediment trapping by Lake Mills, and a trap efficiency of 0.86 was determined for the reservoir. Pre-dam-removal estimates of suspended-sediment load and sediment-discharge relations will help planners monitor geomorphic and habitat changes in the river as it reaches a dynamic equilibrium following the removal of dams.
Progressive failure of lower San Fernando dam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gu, W.H.; Morgenstern, N.R.; Robertson, P.K.
1993-02-01
Postearthquake deformation analyses of the lower San Fernando dam were conducted using an incremental finite-element method. In the analyses, an undrained elastoplastic model was used to simulate the collapse of liquefied materials. The model is developed based on the critical-state boundary-surface theory, the concept of steady-state strength, and the undrained behavior of liquefiable soils. A triggering condition in terms of a collapse surface was considered in this model. The hyperbolic strain-softening relationship has been introduced to simulate the postpeak behavior of liquefied materials. The analyses have shown that a progressive failure under undrained conditions may explain the observed response ofmore » the lower San Fernando dam following the 1971 earthquake. Stress redistribution initiated by the strain softening of liquefied materials is the main reason for undrained flow failures of dams, slopes, and foundations and can occur in a short period ranging from a few seconds to a few minutes. The liquefied zone after stress redistribution may be much larger than the initial liquefied zone caused directly by an earthquake. Therefore, a postearthquake deformation analysis may be essential in liquefaction stability evaluations.« less
10. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
10. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1919. Vol. I, RG 75, Entry 655, BOx 25, National Archives, Washington, D.C.) Photographer unknown. SACATION DAM SITE LOOKING SOUTH SHOWING HEADWORKS OF SAN TAN FLOOD-WATER CANAL - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
23. Photographic copy of photograph. (Source: U.S. Department of interior. ...
23. Photographic copy of photograph. (Source: U.S. Department of interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown, SACATON DAM, NORTH SIDE SIPHON AND INTAKE GATES, 2/23/26 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
14. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
14. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE PIERS - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
22. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
22. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, SOUTH END WITH CANAL AND ROADWAY, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
Kjelstrom, L.C.
1995-01-01
Many individual springs and groups of springs discharge water from volcanic rocks that form the north canyon wall of the Snake River between Milner Dam and King Hill. Previous estimates of annual mean discharge from these springs have been used to understand the hydrology of the eastern part of the Snake River Plain. Four methods that were used in previous studies or developed to estimate annual mean discharge since 1902 were (1) water-budget analysis of the Snake River; (2) correlation of water-budget estimates with discharge from 10 index springs; (3) determination of the combined discharge from individual springs or groups of springs by using annual discharge measurements of 8 springs, gaging-station records of 4 springs and 3 sites on the Malad River, and regression equations developed from 5 of the measured springs; and (4) a single regression equation that correlates gaging-station records of 2 springs with historical water-budget estimates. Comparisons made among the four methods of estimating annual mean spring discharges from 1951 to 1959 and 1963 to 1980 indicated that differences were about equivalent to a measurement error of 2 to 3 percent. The method that best demonstrates the response of annual mean spring discharge to changes in ground-water recharge and discharge is method 3, which combines the measurements and regression estimates of discharge from individual springs.
Feasibility of groundwater recharge dam projects in arid environments
NASA Astrophysics Data System (ADS)
Jaafar, H. H.
2014-05-01
A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.
Light, Helen M.; Vincent, Kirk R.; Darst, Melanie R.; Price, Franklin D.
2006-01-01
From 1954 to 2004, water levels declined in the nontidal reach of the Apalachicola River, Florida, as a result of long-term changes in stage-discharge relations. Channel widening and deepening, which occurred throughout much of the river, apparently caused the declines. The period of most rapid channel enlargement began in 1954 and occurred primarily as a gradual erosional process over two to three decades, probably in response to the combined effect of a dam located at the head of the study reach (106 miles upstream from the mouth of the river), river straightening, dredging, and other activities along the river. Widespread recovery has not occurred, but channel conditions in the last decade (1995-2004) have been relatively stable. Future channel changes, if they occur, are expected to be minor. The magnitude and extent of water-level decline attributable to channel changes was determined by comparing pre-dam stage (prior to 1954) and recent stage (1995-2004) in relation to discharge. Long-term stage data for the pre-dam period and recent period from five streamflow gaging stations were related to discharge data from a single gage just downstream from the dam, by using a procedure involving streamflow lag times. The resulting pre-dam and recent stage-discharge relations at the gaging stations were used in combination with low-flow water-surface profile data from the U.S. Army Corps of Engineers to estimate magnitude of water-level decline at closely spaced locations (every 0.1 mile) along the river. The largest water-level declines occurred at the lowest discharges and varied with location along the river. The largest water-level decline, 4.8 feet, which occurred when sediments were scoured from the streambed just downstream from the dam, has been generally known and described previously. This large decline progressively decreased downstream to a magnitude of 1 foot about 40 river miles downstream from the dam, which is the location that probably marks the downstream limit of the influence of the dam on bed scour. Downstream from that location, previously unreported water-level declines progressively increased to 3 feet at a location 68 miles downstream from the dam, probably as a result of various channel modifications conducted in that part of the river. Water-level declines in the river have substantially changed long-term hydrologic conditions in more than 200 miles of off-channel floodplain sloughs, streams, and lakes and in most of the 82,200 acres of floodplain forests in the nontidal reach of the Apalachicola River. Decreases in duration of floodplain inundation at low discharges were large in the upstream-most 10 miles of the river (20-45 percent) and throughout most of the remaining 75 miles of the nontidal reach (10-25 percent). As a consequence of this decreased inundation, the quantity and quality of floodplain habitats for fish, mussels, and other aquatic organisms have declined, and wetland forests of the floodplain are changing in response to drier conditions. Water-level decline caused by channel change is probably the most serious anthropogenic impact that has occurred so far in the Apalachicola River and floodplain. This decline has been exacerbated by long-term reductions in spring and summer flow, especially during drought periods. Although no trends in total annual flow volumes were detected, long-term decreases in discharge for April, May, July, and August were apparent, and water-level declines during drought conditions resulting from decreased discharge in those 4 months were similar in magnitude to the water-level declines caused by channel changes. The observed changes in seasonal discharge are probably caused by a combination of natural climatic changes and anthropogenic activities in the Apalachicola-Chattahoochee-Flint River Basin. Continued research is needed for geomorphic studies to assist in the design of future floodplain restoration efforts and for hydrologic studies to monitor change
The Glen Canyon Dam adaptive management program: progress and immediate challenges
Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.
2012-01-01
Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior officials who guide the Program.
Zydlewski, Joseph D.; Coghlan, Stephen M.; Gardner, C.; Saunders, R.
2011-01-01
Dams are ubiquitous in coastal regions and have altered stream habitats and the distribution and abundance of stream fishes in those habitats by disrupting hydrology, temperature regime and habitat connectivity. Dam removal is a common restoration tool, but often the response of the fish assemblage is not monitored rigorously. Sedgeunkedunk Stream, a small tributary to the Penobscot River (Maine, USA), has been the focus of a restoration effort that includes the removal of two low-head dams. In this study, we quantified fish assemblage metrics along a longitudinal gradient in Sedgeunkedunk Stream and also in a nearby reference stream. By establishing pre-removal baseline conditions and associated variability and the conditions and variability immediately following removal, we can characterize future changes in the system associated with dam removal. Over 2 years prior to dam removal, species richness and abundance in Sedgeunkedunk Stream were highest downstream of the lowest dam, lowest immediately upstream of that dam and intermediate farther upstream; patterns were similar in the reference stream. Although seasonal and annual variation in metrics within each site was substantial, the overall upstream-to-downstream pattern along the stream gradient was remarkably consistent prior to dam removal. Immediately after dam removal, we saw significant decreases in richness and abundance downstream of the former dam site and a corresponding increase in fish abundance upstream of the former dam site. No such changes occurred in reference sites. Our results show that by quantifying baseline conditions in a small stream before restoration, the effects of stream restoration efforts on fish assemblages can be monitored successfully. These data set the stage for the long-term assessment of Sedgeunkedunk Stream and provide a simple methodology for assessment in other restoration projects.
Control of Sediment Availability on the Path of Channel Recovery in Bedload-Dominated Rivers
NASA Astrophysics Data System (ADS)
Doyle, H.; Renshaw, C. E.; Magilligan, F. J.
2015-12-01
Following a disturbance, a channel can recover to an equilibrium form by adjusting its slope, width, depth, grain size, or some combination of these dimensions that define the recovery path. In this study we relate the channel recovery path to the quantity and caliber of sediment introduced due to dam construction/removal or erosion caused by flooding. We suggest that the recovery path of a channel depends on the availability of sediment of a size that is transported as bedload during bankfull flows (the "mobile fraction"). We define a ratio, S*, of the sediment volume added to the channel because of the disturbance to the average annual sediment flux. We compare S* values to the recovery path of New England gravel-bedded streams following two dam emplacements and removals and flooding related to Tropical Storm Irene. Pelham Dam in Pelham, MA (removed 2012) and Kendrick Dam in Pittsford, VT (removed 2014) were on similar streams: drainage areas ~25 km2, slopes 1-2%, and bankfull widths ~10 m. Sediment was excavated from both impoundments prior to removal, resulting in lower S* values. Irene-affected study sites are on ~10 gravel-bedded streams in VT, NH, and MA. Sediment input at these sites is due to bank failures and landslides, many of which continue to supply sediment to the channel four years after flooding. To track recovery we collected annual topographic and sediment size data and calculated Shields numbers to determine if channels had reached an equilibrium form. We define equilibrium for bedload rivers as Shields numbers at bankfull discharge equal to that required to initiate bedload transport. Following dam emplacements the channels failed to recover because mobile sediment was unavailable. Fining dominated the recovery at Irene-affected sites (~10% reduction in sediment size) and dam removal sites (up to 30-60% reduction) with little post-disturbance change in channel geometry, possibly due to the limited mobile fraction.
2008-09-01
65 Figure 30. Chiang Mai , Thailand March Climatology AREPS M-unit graphic. ..............66 Figure 31. Standard Atmosphere AREPS M-unit...experiment as a precursor to the annual capstone field experiment (May and June) at the Mae Ngat Dam north of Chiang Mai , Thailand. COASTS R&D...Motorola 802.16 network components as discussed in Chapter II. Testing occurred approximately 40 km north of Chiang Mai , Thailand, at the Mae Ngat Dam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rien, Thomas A.; Beiningen, Kirk T.
This project began in July 1986 and is a cooperative effort of federal, state, and tribal fisheries entities to determine (1) the status and habitat requirements, and (2) effects of mitigative measures on productivity of white sturgeon populations in the lower Colombia and Snake rivers.
19. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
19. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CANAL BRIDGE, OPERATING HOUSE AND INTAKE, SOUTH END, 2/14/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
12. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
12. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE FROM QUARRY HILL, PRACTICALLY COMPLETED, 6/18/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
25. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
25. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1928. Vol I. Irrigation District #4, California and Southern Arizona, RG 75, BIA-Phoenix, BOx 40, National Archives, Pacific Southwest Region.) SACATON DAM SHOWING CONSTRUCTION OF CONDUIT AND EXCAVATION OF GRAVEL, APRIL 10, 1928 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
16. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
16. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol, I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, SHOWING WEIR APRONS AND BRIDGE, 6/18/25. - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
24. Photographic copy of photograph. (Source: U.S. Department of interior. ...
24. Photographic copy of photograph. (Source: U.S. Department of interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1928. Vol I. Irrigation District #4, California and Southern Arizona, RG 75, BIA-Phoenix, Box 40, National Archives, Pacific Southwest Region) Photographer unknown. SACATON DAM, CONDUIT ANCHORING AND REINFORCING STEEL, APRIL 10, 1928 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
17. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
17. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF WEIR, 1/17/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
15. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
15. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE DECK, 4/5/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
13. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
13. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF MAIN APRON, 12/9/24 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
11. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
11. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE SITE FROM QUARRY HILL, 10/1/24 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
Sensitivity of Water-Energy Nexus to dam operation: A Water-Energy Productivity concept.
Basheer, Mohammed; Elagib, Nadir Ahmed
2018-03-01
Understanding and modelling the complex nature of interlinkages between water and energy are essential for efficient use of the two resources. Hydropower storage dams represent an interesting example of the water-energy interdependencies since they are often multipurpose. The concept of Water-Energy Productivity (WEP), defined as the amount of energy produced per unit of water lost in the process, is introduced in this study to illustrate the relationship between energy generation and water losses by examining the sensitivity of the Water-Energy Nexus (WEN) to changing dam operation policy. This concept is demonstrated by developing a water allocation model of the White Nile in Sudan, including Jebel Aulia Dam (JAD), using a general river and reservoir simulation software called RiverWare. A number of 77 operation scenarios of JAD are examined for 30 hydrologic years (1980-2009), considering reducing the Full Supply Level (FSL) gradually from its current value to the minimum possible value, increasing the Minimum Operating Level (MOL) gradually to the maximum possible level, and operating the dam at a Constant Operating Level (COL). The results show that raising the operating level does not necessarily increase the WEP. In comparison to the current policy, the analysis shows that a maximum WEP of 32.6GWh/BCM (GWh/Billion Cubic Meters) would be reached by raising the MOL to 375masl (meters above sea level), resulting in an increase in average annual energy generation to 164.6GWh (+18.1%) at the expense of an annual water loss of 5.05BCM (+12.7%). Even though this operation policy results in a more efficient water use compared to the original operation policy, a basin-wide assessment that includes all hydropower storage dams in the Nile basin should be conducted to decide on where and how much energy should be generated. The present analysis and future examination of the multi-dimensions of the WEN in the context of dam operation are imperative to improve the decision making in the quest for efficient resource use and management. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Comes, E.; Jaeger, K. L.
2016-12-01
Lowhead dams have had a profound cumulative impact on rivers and streams. Their removal is an increasingly popular restoration method, however, geomorphic response remains poorly resolved. This study quantified geomorphic change following two lowhead dam removal in the Olentangy River and the downstream Scioto River, which flows through Columbus, Ohio. A paired control-treatment design compared change above and below a removed dam (treatment) to an existing dam (control) in each river system over a two and three-year period. Upstream treatment reaches included passive and active restoration via in-channel engineering. Channel change was quantified through repeat bathymetric surveys using an acoustic Doppler current profiles and near-surface riverbed substrate sampling at several time periods ( 2 surveys/year). Differencing of digital elevation models from each bathymetric survey quantified changes in erosion and deposition patterns and bathymetric heterogeneity. Results indicate upstream treatment reaches were net erosional with overall substrate coarsening that included D84 sand to gravel clast size shifts. The Olentangy River's downstream treatment reach experienced concurrent erosion and deposition within a given survey although net erosion dominated the first year of the three-year study period. The downstream treatment reach also experienced substantial grain size fluctuation between surveys with little overall change. Unanticipated engineering activities in the downstream treatment reach of the Scioto River confounded geomorphic change in this reach. Non-metric multidimensional scaling analysis indicates a moderate, but abrupt change towards overall increased heterogeneity in the first year following dam removal in the downstream reach with little overall change in the following two years. Active restoration activities in the upstream treatment reach resulted in abrupt, but slight shifts towards decreased bathymetric heterogeneity despite substantial riverbed regrading to create pool-riffle features. Repeat intra-annual surveys revealed that the river system experiences clear seasonal patterns of erosion and deposition with associated substrate coarsening and fining that would not be evident in typical dam removal studies that generally are limited to annual surveys.
Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.
2015-01-01
Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (<7.6 m high) fragment United States rivers. Despite potential adverse impacts of these ubiquitous disturbances, the spatial impacts of low-head dams on geomorphology and ecology are largely untested. Progress for research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.
Costigan, Katie H.; Daniels, Melinda D.
2015-01-01
Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (<7.6 m high) fragment United States rivers. Despite potential adverse impacts of these ubiquitous disturbances, the spatial impacts of low-head dams on geomorphology and ecology are largely untested. Progress for research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams. PMID:26540105
Erosion and sediment transport in the Owens River near Bishop, California
Williams, Rhea P.
1975-01-01
Closure of Pleasant Valley Dam in 1954 has almost eliminated the supply of gravel to the 16-mile (25.7-kilometre) study reach of the Owens River. Because of armoring of the channel, scour has been limited to approximately 1 foot (0.3 metre) in the upper 2.3 miles (3.7 kilometres).This report presents information useful in determining long-term erosion effects below Pleasant Valley Dam, in assessing the feasibility of a proposed bypass channel versus retention of the main channel in its present state, and in determining man's influence on river morphology.Bedload transport is dependent on the hydraulics of a section and the availability of material. Ninety-eight percent by weight of the sampled bedload transported between sites 1 and 6 in the study reach was finer than 8 millimetres, although only 6 to 12 percent of the material in the bed available for transport was finer than 8 millimetres. Bank material, a prime source of new material for transport, is predominantly finer than 16 millimetres.Bank erosion is accelerated by wide ranges in flow release. The bank-erosion rates interpreted from aerial photographs indicate average annual erosion rates of 750 tons (680 tonnes) from 1947 to 1967, 1,970 tons (1,790 tonnes) from 1967 to 1968, and 2,020 tons (1,830 tonnes) from 1968 to 1971. These rates are compatible with the water discharge-sediment discharge relation developed from field data collected during 1972-73.Hydraulic geometry of the six sites indicates a shift in the river system regime since 1954. These changes have progressed downstream from the dam to a point between sites 4 and 5. Farther downstream channel changes will occur until the channel stabilizes.
A Framework to Assess the Cumulative Hydrological Impacts of Dams on flow Regime
NASA Astrophysics Data System (ADS)
Wang, Y.; Wang, D.
2016-12-01
In this study we proposed a framework to assess the cumulative impact of dams on hydrological regime, and the impacts of the Three Gorges Dam on flow regime in Yangtze River were investigated with the framework. We reconstructed the unregulated flow series to compare with the regulated flow series in the same period. Eco-surplus and eco-deficit and the Indicators of Hydrologic Alteration parameters were used to examine the hydrological regime change. Among IHA parameters, Wilcoxon signed-rank test and Principal Components Analysis identified the representative indicators of hydrological alterations. Eco-surplus and eco-deficit showed that the reservoir also changed the seasonal regime of the flows in autumn and winter. Annual extreme flows and October flows changes lead to negative ecological implications downstream from the Three Gorges Dam. Ecological operation for the Three Gorges Dam is necessary to mitigate the negative effects on the river ecosystem in the middle reach of Yangtze River. The framework proposed here could be a robust method to assess the cumulative impacts of reservoir operation.
NASA Astrophysics Data System (ADS)
Jidin, Razali; Othman, Bahari
2013-06-01
The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.
Estimation of sediment deposits in the Ghézala reservoir in northern Tunisia
NASA Astrophysics Data System (ADS)
Mathlouthi, Majid; Lebdi, Fethi
2018-04-01
The control of sedimentation in a reservoir provides a global evaluation of the process of erosion and transportation of sediment. Knowledge of sedimentation is useful for reservoir management. Bathymetric surveys can be used to assess the silting volume of dams. The results of two surveys of the Ghézala dam reservoir in northern Tunisia are available. The measurements provide initial information about the quantity and variability of silting and the mechanism of sediment deposition. According to the results of measurements, the average annual specific sediment yield of the Ghézala dam watershed is estimated at 1851 t km-2 yr-1. The annual average sediment volume trapped varies from 23 000 m3 in 1993 to 66 692 m3 in 2011. The sedimentation rates increases from 0.20 to 0.57 % overtime. The results indicate interdependence between the specific erosion rates and the occurrence of soils on steep slopes. The pressure exerted on the soil by plowing as well as overgrazing to meet the needs of the population of this area has exposed the soil to continued deterioration manifested by increased erosion endangering the only source of revenue for the area.
Summary of juvenile salmonid passage and survival at McNary Dam-Acoustic survival studies, 2006-09
Adams, Noah S.; Evans, Scott D.
2011-01-01
Passage and survival data were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Given the importance of these annual studies, the primary objectives of this report were to summarize the findings of these annual studies to ensure that passage and survival metrics are consistently calculated and reported across all years and to consolidate this information in a single document, thereby making it easier to reference. It is worth noting that this report does not contain all the information from all the annual reports. The intent of this report was to summarize the key findings from multiple years of research. The reader is encouraged to reference the annual reports if more detailed information is needed. Chapter 1 summarizes existing behavior, passage, and survival results for fish released 10 rkm upstream of McNary Dam and from the McNary Dam tailrace during 2006-09. Chapter 2 summarizes existing behavior, passage, and survival results for fish released in the mid-Columbia River and detected at McNary Dam during 2006-09. Results from 2006 indicated that higher spill discharge generally resulted in higher fish passage through spill, and in turn, higher fish survival through the entire dam. Within the spillway, passage effectiveness was highest for the south spill bays, adjacent to the powerhouse. Increased passage in this area, combined with detailed 3-dimensional approach paths, aided in the design and location of the temporary spillway weirs (TSWs) at McNary Dam prior to the 2007 migration of juvenile salmonids. During the 2007 study, the TSWs were tested under two spill treatments during the spring and summer: a "2006 Modified spill," and a "2007 test spill." In the spring, slightly higher discharge through spill bays 14-17 was the primary difference between the spill treatments tested. During the summer, spill treatments were characterized by a high (60 percent) and low (40 percent) percent flow of the total discharge going through the spillway. Flow through the TSWs represented about 7-8 percent of total project discharge in spring and about 10-11 percent of total project discharge in summer. Overall, the TSWs passed 24 percent of yearling Chinook salmon and 27 percent of subyearling Chinook salmon, but passed about 65 percent of juvenile steelhead. In spring, there was little evidence for an effect of spill treatment on either fish passage or survival, however, this was not surprising given there was a relatively small difference between spill treatments. For subyearling Chinook salmon during the summer study, high spill discharge resulted in higher fish passage through the spillway and lower fish passage through the powerhouse. Season wide survival (paired-release) for yearling and subyearling Chinook salmon was 0.98 and 0.92 (SE<0.04) through TSW 20, and 0.96 and 0.97 (SE<0.04) through TSW 22, respectively. Season-wide survival (single-release) for juvenile steelhead was 0.98 (SE=0.024) through TSW 20, and 0.90 (SE=0.02) through TSW 22. The extent to which location and structural design contributed to the differences observed between the two TSWs was uncertain. Nonetheless, the TSWs performed similarly to surface-oriented fish passage structures at other locations and appear to be a useful fish passage alternative at McNary Dam. The 2008 and 2009 studies confirmed previous results showing high survival for fish passing through the TSWs, especially juvenile steelhead. Although the number of all fish species passing through the TSWs was lower in 2008 and 2009 compared to 2007, fish passage efficiency for juvenile steelhead and subyearling Chinook salmon was higher in years with the TSWs, compared to 2006, before the TSWs were in place.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porter, Russell
2009-09-10
This report presents results for year seventeen in the basin-wide Experimental Northern Pikeminnow Management Program to harvest northern pikeminnow1 (Ptychocheilus oregonensis) in the Columbia and Snake Rivers. This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 throughmore » 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991 - a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and dam-angling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified (small-sized) Merwin trapnet. We found this floating trapnet to be very effective in catching northern pikeminnow at specific sites. Consequently, in 1993 we examined a system-wide fishery using floating trapnets, but found this fishery to be ineffective at harvesting large numbers of northern pikeminnow on a system-wide scale. In 1994, we investigated the use of trap nets and gillnets at specific locations where concentrations of northern pikeminnow were known or suspected to occur during the spring season (i.e., March through early June). In addition, we initiated a concerted effort to increase public participation in the sport-reward fishery through a series of promotional and incentive activities. In 1995, 1996, and 1997, promotional activities and incentives were further improved based on the favorable response in 1994. Results of these efforts are subjects of this annual report. Evaluation of the success of test fisheries in achieving our target goal of a 10-20% annual exploitation rate on northern pikeminnow is presented in Report C of this report. Overall program success in terms of altering the size and age composition of the northern pikeminnow population and in terms of potential reductions in loss of juvenile salmonids to northern pikeminnow predation is also discussed in Report C. Program cooperators include the Pacific States Marine Fisheries Commission (PSMFC), Oregon Department of Fish and Wildlife (ODFW), and Washington Department of Fish and Wildlife (WDFW), and the U. S. Department of Agriculture (USDA), Animal Damage Unit as a contractor to test Dam Angling. The PSMFC was responsible for coordination and administration of the program; PSMFC subcontracted various tasks and activities to ODFW and WDFW based on the expertise each brought to the tasks involved in implementing the program and dam angling to the USDA.« less
Kock, Tobias J.; Liedtke, Theresa L.; Rondorf, Dennis W.; Serl, John D.; Kohn, Mike; Bumbaco, Karin A.
2012-01-01
A 4-year evaluation was conducted to determine the proportion of juvenile coho salmon Oncorhynchus kisutch passing Cowlitz Falls Dam, on the Cowlitz River, Washington, during winter. River and reservoir populations of coho salmon parr were monitored using radiotelemetry to determine if streamflow increases resulted in increased downstream movement and dam passage. This was of interest because fish that pass downstream of Cowlitz Falls Dam become landlocked in Riffe Lake and are lost to the anadromous population. Higher proportions of reservoir-released fish (0.391-0.480) passed Cowlitz Falls Dam than did river-released fish (0.037-0.119). Event-time analyses demonstrated that streamflow increases were important predictors of dam passage rates during the study. The estimated effect of increasing streamflows on the risk of dam passage varied annually and ranged from 9% to 75% for every 28.3 m3/s increase in streamflow. These results have current management implications because they demonstrate the significance of dam passage by juvenile coho salmon during winter months when juvenile fish collection facilities are typically not operating. The results also have future management implications because climate change predictions suggest that peak streamflow timing for many watersheds in the Pacific Northwest will shift from late spring and early summer to winter. Increased occurrence of intense winter flood events is also expected. Our results demonstrate that juvenile coho salmon respond readily to streamflow increases and initiate downstream movements during winter months, which could result in increased passage at dams during these periods if climate change predictions are realized in the coming decades.
NASA Astrophysics Data System (ADS)
Le Roux, Jay
2016-04-01
Soil erosion not only involves the loss of fertile topsoil but is also coupled with sedimentation of dams, a double barrel problem in semi-arid regions where water scarcity is frequent. Due to increasing water requirements in South Africa, the Department of Water and Sanitation is planning water resource development in the Mzimvubu River Catchment, which is the only large river network in the country without a dam. Two dams are planned including a large irrigation dam and a hydropower dam. However, previous soil erosion studies indicate that large parts of the catchment is severely eroded. Previous studies, nonetheless, used mapping and modelling techniques that represent only a selection of erosion processes and provide insufficient information about the sediment yield. This study maps and models the sediment yield comprehensively by means of two approaches over a five-year timeframe between 2007 and 2012. Sediment yield contribution from sheet-rill erosion was modelled with ArcSWAT (a graphical user interface for SWAT in a GIS), whereas gully erosion contributions were estimated using time-series mapping with SPOT 5 imagery followed by gully-derived sediment yield modelling in a GIS. Integration of the sheet-rill and gully results produced a total sediment yield map, with an average of 5 300 t km-2 y-1. Importantly, the annual average sediment yield of the areas where the irrigation dam and hydropower dam will be built is around 20 000 t km-2 y-1. Without catchment rehabilitation, the life expectancy of the irrigation dam and hydropower dam could be 50 and 40 years respectively.
Geomorphic and Ecological Disturbance and Recovery from Two Small Dams and Their Removal
Tullos, Desirée D.; Finn, Debra S.; Walter, Cara
2014-01-01
Dams are known to impact river channels and ecosystems, both during their lifetime and in their decommissioning. In this study, we applied a before-after-control-impact design associated with two small dam removals to investigate abiotic and biotic recovery trajectories from both the elimination of the press disturbance associated with the presence of dams and the introduction of a pulse disturbance associated with removal of dams. The two case studies represent different geomorphic and ecological conditions that we expected to represent low and high sensitivities to the pulse disturbance of dam removal: the 4 m tall, gravel-filled Brownsville Dam on the wadeable Calapooia River and the 12.5 m tall, sand and gravel-filled Savage Rapids Dam on the largely non-wadeable Rogue River. We evaluated both geomorphic and ecological responses annually for two years post removal, and asked if functional traits of the macroinvertebrate assemblages provided more persistent signals of ecological disturbance than taxonomically defined assemblages over the period of study. Results indicate that: 1) the presence of the dams constituted a strong ecological press disturbance to the near-downstream reaches on both rivers, despite the fact that both rivers passed unregulated flow and sediment during the high flow season; 2) ecological recovery from this press disturbance occurred within the year following the restoration action of dam removal, whereas signals of geomorphic disturbance from the pulse of released sediment persisted two years post-removal, and 3) the strength of the press disturbance and the rapid ecological recovery were detected regardless of whether recovery was assessed by taxonomic or functional assemblages and for both case studies, in spite of their different geomorphic settings. PMID:25233231
NASA Astrophysics Data System (ADS)
Kameyama, S.; Shimazaki, H.; Nohara, S.; Fukushima, M.; Kudo, K.; Sato, T.
2008-12-01
In the Mekong River watershed, traditional social and industrial systems have long existed in harmony with water and biological resources. Since the 1950s, many dam-construction projects have been started to develop power and water resources to meet increasing demand for energy and food production. Since the 1970s, there have been temporary interruptions to these projects because of civil war or regional volatility of international relations. Many of these projects have been restarted in the last 15 years. This raises international interest, as there are transboundary issues cross-border issues related to both development assistance and environmental conservation. By 2008, two Chinese dams had already been completed (the Manwan dam in 1996 and the Dachaoshan dam in 2003) on the Mekong River in Yunnan province. Dam construction has some positive impacts, such as electricity production, management of water resources, and flood control. However, upstream control of water discharge can have negative impacts on traditional agricultural systems and fisheries downstream from the dams, such as drastic changes in flow volume and sediment load. We used hydrological simulation of the watershed to quantify the impact of the construction of the Dachaoshan dam by comparing annual water discharge and sediment transport before and after the dam was completed. Our main objectives were to use watershed hydrologic modeling to simulate changes to annual hydrological parameters and sediment transport, and to map spatio-temporal changes of these data before and after dam construction. Our study area covered the part of the Mekong River main channel that extends about 100 km downstream from the junction of the borders of Myanmar, Thailand, and the Lao People's Democratic Republic. We used five data validation points at 25-km intervals along this section of the river and calculated model parameters every 1 km. The years we modeled were 1990 (began dam construction) and 2006 (after dam completed). We used the MIKE-SHE and MIKE11-Enterprise (developed by DHI) to calculate seasonal changes of water level, water velocity, and sediment transport. These models provided both water discharge and sediment transport dynamics at each modeled point along the river. The sediment budget was calculated as the difference of sediment load by volume between adjacent modeled points. All parameters used in the model were calibrated with field survey data; the river structure and water flows were measured in November 2007. To validate our simulated results we used historical water-level records from the towns of Chensean and Chencone. To determine the relationship between water discharge and sediment load, we analyzed the turbidity of monthly river water samples collected in the study region between November 2007 and November 2008. Our watershed runoff models simulated water discharge and sediment load at 1-km intervals and 1-h time steps for 1990 and 2006. The model results were compiled in GIS format and maps were produced to provide simple spatial displays of modeled parameters. Our simulations show that after construction of the dam, there was a moderate decrease in peak discharge volume and water velocity during the rainy season from August to September.
Estimates of average annual tributary inflow to the lower Colorado River, Hoover Dam to Mexico
Owen-Joyce, Sandra J.
1987-01-01
Estimates of tributary inflow by basin or area and by surface water or groundwater are presented in this report and itemized by subreaches in tabular form. Total estimated average annual tributary inflow to the Colorado River between Hoover Dam and Mexico, excluding the measured tributaries, is 96,000 acre-ft or about 1% of the 7.5 million acre-ft/yr of Colorado River water apportioned to the States in the lower Colorado River basin. About 62% of the tributary inflow originates in Arizona, 30% in California, and 8% in Nevada. Tributary inflow is a small component in the water budget for the river. Most of the quantities of unmeasured tributary inflow were estimated in previous studies and were based on mean annual precipitation for 1931-60. Because mean annual precipitation for 1951-80 did not differ significantly from that of 1931-60, these tributary inflow estimates are assumed to be valid for use in 1984. Measured average annual runoff per unit drainage area on the Bill Williams River has remained the same. Surface water inflow from unmeasured tributaries is infrequent and is not captured in surface reservoirs in any of the States; it flows to the Colorado River gaging stations. Estimates of groundwater inflow to the Colorad River valley. Average annual runoff can be used in a water budget; although in wet years, runoff may be large enough to affect the calculation of consumptive use and to be estimated from hydrographs for the Colorado River valley are based on groundwater recharge estimates in the bordering areas, which have not significantly changed through time. In most areas adjacent to the Colorado River valley, groundwater pumpage is small and pumping has not significantly affected the quantity of groundwater discharged to the Colorado River valley. In some areas where groundwater pumpage exceeds the quantity of groundwater discharge and water levels have declined, the quantity of discharge probably has decreased and groundwater inflow to the Colorado River valley will eventually be reduced if not stopped completely. Groundwater discharged at springs below Hoover Dam is unused and flows directly to the Colorado River. (Lantz-PTT)
Will river erosion below the Three Gorges Dam stop in the middle Yangtze?
NASA Astrophysics Data System (ADS)
Lai, X.; Yin, D.; Finlayson, B. L.; Wei, T.; Li, M.; Yuan, W.; Yang, S.; Dai, Z.; Gao, S.; Chen, Z.
2017-11-01
The environmental impact of the Three Gorges Dam has been a subject of vigorous academic, political and social debate since its inception. This includes the key issue of post-dam river channel erosion, which was predicted by the feasibility study to extend to the river mouth. In this paper we examine the geomorphic response of the channel of the middle Yangtze for 660 km downstream of the dam. Using data on channel characteristics, bed material and sediment transport, we show that in the decade following the dam closure, pre-dam seasonal erosion has been replaced by year-round erosion, a pattern most marked at the upstream end of the study area. The sediment carrying capacity of the river channel has been largely reduced below the dam. The locus of bed scour has moved progressively downstream, ceasing as the bed material became too coarse to be transported (e.g. D50: 0.29 mm pre-dam coarsened to 20 mm below the dam by 2008). About 400 km below the dam there is a reduction in channel slope that changes the sediment carrying capacity from 0.25 kg m-3 to only about 0.05 kg m-3, which is insufficient to move bed sediment. The new long-term hydro-morphological equilibrium that will be established in this section of the middle Yangtze will prevent the further incision downstream initiated by the Three Gorges Dam. The results suggest that the full extent of adverse environmental impact predicted by the pre-dam studies will not eventuate.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... Contact: Larry Mann, Progress Energy Carolinas, Inc., Tillery Hydro Plant, 179 Tillery Dam Road, Mount... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2008-12-22
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2009-08-06
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
18. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
18. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, SOUTH END SLUICEWAY, INTAKE CANAL BRIDGE, OPERATING HOUSE, AND MAIN BRIDGE, 6/18/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ
Schenk, E.R.; Hupp, C.R.
2009-01-01
Many rivers and streams of the Mid-Atlantic Region, United States (U.S.) have been altered by postcolonial floodplain sedimentation (legacy sediment) associated with numerous milldams. Little Conestoga Creek, Pennsylvania, a tributary to the Susquehanna River and the Chesapeake Bay, is one of these streams. Floodplain sedimentation rates, bank erosion rates, and channel morphology were measured annually during 2004-2007 at five sites along a 28-km length of Little Conestoga Creek with nine colonial era milldams (one dam was still in place in 2007). This study was part of a larger cooperative effort to quantify floodplain sedimentation, bank erosion, and channel morphology in a high sediment yielding region of the Chesapeake Bay watershed. Data from the five sites were used to estimate the annual volume and mass of sediment stored on the floodplain and eroded from the banks for 14 segments along the 28-km length of creek. A bank and floodplain reach based sediment budget (sediment budget) was constructed for the 28 km by summing the net volume of sediment deposited and eroded from each segment. Mean floodplain sedimentation rates for Little Conestoga Creek were variable, with erosion at one upstream site (-5 mm/year) to deposition at the other four sites (highest = 11 mm/year) despite over a meter of floodplain aggradation from postcolonial sedimentation. Mean bank erosion rates range between 29 and 163 mm/year among the five sites. Bank height increased 1 m for every 10.6 m of channel width, from upstream to downstream (R2 = 0.79, p < 0.0001) resulting in progressively lowered hydraulic connectivity between the channel and the floodplain. Floodplain sedimentation and bank erosion rates also appear to be affected by the proximity of the segments to one existing milldam, which promotes deposition upstream and scouring downstream. The floodplain and bank along the 28-km reach produced a net mean sediment loss of 5,634 Mg/year for 2004-2007, indicating that bank erosion was exceeding floodplain sedimentation. In particular, the three segments between the existing dam and the confluence with the Conestoga River (32% of the studied reach) account for 97% of the measured net sediment budget. Future research directed at understanding channel equilibria should facilitate efforts to reduce the sediment impacts of dam removal and legacy sediment. ?? 2009 American Water Resources Association.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnsen, Richard C.
1990-02-19
This project is a part of the continuing Smolt Monitoring Program (SMP) to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC). The SMP provides timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis by the FPC for travel time, relative magnitude and timing of the smolt migration. Sampling sites were McNary, John Day and Bonneville Dams under the SMP, and the Dalles Dam under the Fish Spill Memorandum of Agreement'' for 1989. All pertinent fish capture, condition and brand data, as well as dam operationsmore » and river flow data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 15 refs., 6 figs., 6 tabs.« less
Flynn, Marilyn E.; Hart, Robert J.; Marzolf, G. Richard; Bowser, Carl J.
2001-01-01
The productivity of the trout fishery in the tailwater reach of the Colorado River downstream from Glen Canyon Dam depends on the productivity of lower trophic levels. Photosynthesis and respiration are basic biological processes that control productivity and alter pH and oxygen concentration. During 1998?99, data were collected to aid in the documentation of short- and long-term trends in these basic ecosystem processes in the Glen Canyon reach. Dissolved-oxygen, temperature, and specific-conductance profile data were collected monthly in the forebay of Glen Canyon Dam to document the status of water chemistry in the reservoir. In addition, pH, dissolved-oxygen, temperature, and specific-conductance data were collected at five sites in the Colorado River tailwater of Glen Canyon Dam to document the daily, seasonal, and longitudinal range of variation in water chemistry that could occur annually within the Glen Canyon reach.
15. DETAIL OF WORKS PROGRESS ADMINISTRATION (WPA) MONUMENT LOCATED ON ...
15. DETAIL OF WORKS PROGRESS ADMINISTRATION (WPA) MONUMENT LOCATED ON TOP OF BANK JUST SOUTH OF NORTH FOOT BRIDGE - Upper Doughty Dam, 200 feet west of Garden State Parkway, 1.7 miles west of Absecon, Egg Harbor City, Atlantic County, NJ
Czuba, Christiana R.; Randle, Timothy J.; Bountry, Jennifer A.; Magirl, Christopher S.; Czuba, Jonathan A.; Curran, Christopher A.; Konrad, Christopher P.; Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.
2011-01-01
During and after the planned incremental removal of two large, century-old concrete dams between 2011 and 2014, the sediment-transport regime in the lower Elwha River of western Washington will initially spike above background levels and then return to pre-dam conditions some years after complete dam removal. Measurements indicate the upper reaches of the steep-gradient Elwha River, draining the northeast section of the Olympic Mountains, carries between an estimated 120,000 and 290,000 cubic meters of sediment annually. This large load has deposited an estimated 19 million cubic meters of sediment within the two reservoirs formed by the Elwha and Glines Canyon Dams. It is anticipated that from 7 to 8 million cubic meters of this trapped sediment will mobilize and transport downstream during and after dam decommissioning, restoring the downstream sections of the sediment-starved river and nearshore marine environments. Downstream transport of sediment from the dam sites will have significant effects on channel morphology, water quality, and aquatic habitat during and after dam removal. Sediment concentrations are expected to be between 200 and 1,000 milligrams per liter during and just after dam removal and could rise to as much as 50,000 milligrams per liter during high flows. Downstream sedimentation in the river channel and flood plain will be potentially large, particularly in the lower Elwha River, an alluvial reach with a wide flood plain. Overall aggradation could be as much as one to several meters. Not all reservoir sediment, however, will be released to the river. Some material will remain on hill slopes and flood plains within the drained reservoirs in quantities that will depend on the hydrology, precipitation, and mechanics of the incising channel. Eventually, vegetation will stabilize this remaining reservoir sediment, and the overall sediment load in the restored river will return to pre-dam levels.
Buccola, Norman L.
2017-05-31
Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.
An assessment of fish assemblage structure in a large river
Kiraly, Ian A.; Coghlan, S.M.; Zydlewski, Joseph D.; Hayes, D.
2015-01-01
The Penobscot River drains the largest watershed in Maine and once provided spawning and rearing habitats to 11 species of diadromous fishes. The construction of dams blocked migrations of these fishes and likely changed the structure and function of fish assemblages throughout the river. The proposed removal of two main-stem dams, improved upstream fish passage at a third dam, and construction of a fish bypass on a dam obstructing a major tributary is anticipated to increase passage of and improve habitat connectivity for both diadromous and resident fishes. We captured 61 837 fish of 35 species in the Penobscot River and major tributaries, through 114 km of boat electrofishing. Patterns of fish assemblage structure did not change considerably during our sampling; relatively few species contributed to seasonal and annual variability within the main-stem river, including smallmouth bass Micropterus dolomieu, white sucker Catostomus commersonii, pumpkinseed Lepomis gibbosus, and golden shiner Notemigonus crysoleucas. However, distinct fish assemblages were present among river sections bounded by dams. Many diadromous species were restricted to tidal waters downriver of the Veazie Dam; Fundulus species were also abundant within the tidal river section. Smallmouth bass and pumpkinseed were most prevalent within the Veazie Dam impoundment and the free-flowing river section immediately upriver, suggesting the importance of both types of habitat that supports multiple life stages of these species. Further upriver, brown bullhead Ameiurus nebulosus, yellow perch Perca flavescens, chain pickerel Esox niger, and cyprinid species were more prevalent than within any other river section. Our findings describe baseline spatial patterns of fish assemblages in the Penobscot River in relation to dams with which to compare assessments after dam removal occurs.
Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bellgraph, Brian J.
2009-03-31
The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull troutmore » were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.« less
NASA Astrophysics Data System (ADS)
Magilligan, F. J.; Nislow, K. H.; Kynard, B. E.; Hackman, A. M.
2016-01-01
Dam removal is becoming an increasingly important component of river restoration, with > 1100 dams having been removed nationwide over the past three decades. Despite this recent progression of removals, the lack of pre- to post-removal monitoring and assessment limits our understanding of the magnitude, rate, and sequence of geomorphic and/or ecological recovery to dam removal. Taking advantage of the November 2012 removal of an old ( 190 year-old) 6-m high, run-of-river industrial dam on Amethyst Brook (26 km2) in central Massachusetts, we identify the immediate eco-geomorphic responses to removal. To capture the geomorphic responses to dam removal, we collected baseline data at multiple scales, both upstream ( 300 m) and downstream (> 750 m) of the dam, including monumented cross sections, detailed channel-bed longitudinal profiles, embeddedness surveys, and channel-bed grain size measurements, which were repeated during the summer of 2013. These geomorphic assessments were combined with detailed quantitative electrofishing surveys of stream fish richness and abundance above and below the dam site and throughout the watershed and visual surveys of native anadromous sea lamprey (Petromyzon marinus) nest sites. Post-removal assessments were complicated by two events: (1) upstream knickpoint migration exhumed an older (ca. late eighteenth century) intact wooden crib dam 120 m upstream of the former stone dam, and (2) the occurrence of a 10-20 year RI flood 6 months after removal that caused further upstream incision and downstream aggradation. Now that the downstream reach has been reconnected to upstream sediment supply, the predominant geomorphic response was bed aggradation and associated fining (30-60% reduction). At dam proximal locations, aggradation ranged from 0.3 to > 1 m where a large woody debris jam enhanced aggradation. Although less pronounced, distal locations still showed aggradation with a mean depth of deposition of 0.20 m over the 750-m downstream reach. Post-removal, but pre-flood, bed surveys indicate 2 m of incision had migrated 25 m upstream of the former reservoir before encountering the exhumed dam, which now acts as the new grade control, limiting progressive headcutting. Approximately 1000 m3 of sediment was evacuated in the first year, with 67% of the volume occurring by pre-flood, process-driven (e.g., changes in base level) controls. The combination of changes in channel-bed sedimentology, the occurrence of a large magnitude flood, and the emergence of the new crib dam that is a likely barrier to fish movement was associated with major reductions in abundance and richness in sites downstream and immediately upstream adjacent to the former dam in post-removal sampling. At the same time, we documented the presence of four species of fish, including sea lamprey, which were not present above the dam prior to removal, indicating that upstream passage has been achieved; and we also documented lamprey spawning activity at sites immediately below the dam, which had previously been unsuitable owing to an excessively coarse and armored riverbed. Our results point to the importance of interactions between dam removal and flood disturbance effects, with important implications for short- and long-term monitoring and assessment of dam impacts to river systems.
NASA Astrophysics Data System (ADS)
Pisaniello, John D.; Tingey-Holyoak, Joanne L.
2017-02-01
Farm dams that are not managed properly at the individual level can create water storage equity and safety threats to downstream communities and the environment that aggregate at the catchment level: a potential 'dual-extreme cumulative' problem. The paper provides indicative evidence and develops understanding of this novel phenomenon and associated policy needs within the Australian setting comprising dual hydrologic extremes of floods and droughts, further exacerbated by climate change. This is achieved through comparative case studies involving surveys of both dam owner perceptions and dam management practices in four States representing a complete range of integrated policy approaches from weak to strong. Survey results find most farmers do not believe dam maintenance is important, will undertake spillway blocking and do not plan for emergencies. These results are supported by physical on-site findings of farmers neglecting dams and blocking or under-designing spillways, in turn storing more water than they are entitled and creating unsafe dams at both the individual and cumulative levels. From detailed cross-case comparative assessment against policy context, it emerges that on-farm perceptions and practices form a range of 'acceptability' of dam management that directly reflects policy strength and integration in each setting. The paper advances the international small dams policy, agricultural water management and hydrology literatures, evidencing the need for effective integrated policy to mitigate dual extreme cumulative threats. Importantly, guidance is provided to jurisdictions internationally with high inter-annual rainfall variation on how best to design integrated policy that can achieve both water storage equity and safety in agricultural catchments.
Yakima River Radio-Telemetry Study: Spring Chinook Salmon, 1991-1992 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hockersmith, Eric
1994-09-01
As part of the presupplementation planning, baseline data on the productivity of spring chinook salmon (Oncorhynchus tshawytscha) in the Yakima River have been collected. However, for adult salmonids, data on habitat use, delays in passage at irrigation diversions, migration rates, and substock separation had not been previously collected. In 1991, the National Marine Fisheries Service began a 2-year radio-telemetry study of adult spring chinook salmon in the Yakima River Basin. Specific objectives addressed in this study were: to determine spawning populations` run timing, passage patterns at irrigation diversion dams, and morphometric characteristics to determine where and when substocks become separated;more » to evaluate fish passage at Yakima River Basin diversion dams including Prosser, Sunnyside, Wapato, Roza, Town Diversion, Easton, Cowiche, and Wapatox Dams; to determine spring chinook salmon migration rates between Yakima River Basin dams, prespawning behavior, temporal distribution, and habitat utilization; to identify spawning distribution and timing of spring chinook salmon; to determine the amount and cause of prespawning mortality of spring chinook salmon; and to evaluate adult fish-handling procedures for the right-bank, adult-trapping facility at Prosser Dam.« less
1984-02-01
of the number of fish that may have passed through a dam was given. REFERENCE: Gustafson. S. P., J. L. Gels , and C. J. Bublitz. 1979. 1978 Progress...77 253 9.5 0 If 03/03/77 162 53.5 0 " 01/18/77 118 1 0 " 05/06/77 226 4 0 03/11/77 170 28 0 ASO ,"j
Measured and simulated runoff to the lower Charles River, Massachusetts, October 1999-September 2000
Zarriello, Phillip J.; Barlow, Lora K.
2002-01-01
The lower Charles River, the water body between the Watertown Dam and the New Charles River Dam, is an important recreational resource for the Boston, Massachusetts, metropolitan area, but impaired water quality has affected its use. The goal of making this resource fishable and swimmable requires a better understanding of combined-sewer-overflow discharges, non-combined-sewer-overflow stormwater runoff, and constituent loads. This report documents the modeling effort used to calculate non-combined-sewer-overflow runoff to the lower Charles River. During the 2000 water year, October 1, 1999?September 30, 2000, the U.S. Geological Survey collected precipitation data at Watertown Dam and compiled data from five other precipitation gages in or near the watershed. In addition, surface-water discharge data were collected at eight sites?three relatively homogenous land-use sites, four major tributary sites, and the Charles River at Watertown Dam, which is the divide between the upper and lower watersheds. The precipitation and discharge data were used to run and calibrate Stormwater Management Models developed for the three land-use subbasins (single-family, multi-family, and commercial), and the two tributary subbasins (Laundry and Faneuil Brooks). These calibrated models were used to develop a sixth model to simulate 54 ungaged outfalls to the lower Charles River. Models developed by the U.S. Geological Survey at gaged sites were calibrated with up to 24 storms. Each model was evaluated by comparing simulated discharge against measured discharge for all storms with appreciable precipitation and reliable discharge data. The model-fit statistics indicated that the models generally were well calibrated to peak discharge and runoff volumes. The model fit of the commercial land-use subbasin was not as well calibrated compared to the other models because the measured flows appear to be affected by variable conditions not represented in the model. A separate Stormwater Management Model of the Stony Brook Subbasin previously developed by others was evaluated with the newly collected data from this study; this model had a model fit comparable to the models developed by the U.S. Geological Survey. The total annual runoff to the lower Charles River during the 2000 water year, not including contributions from combined-sewer-overflows except from the Stony Brook Subbasin, was 16,500 million cubic feet; 92 percent of the inflow was from the Charles River above Watertown Dam, 3 percent was from the Stony Brook Subbasin, 2 percent was from the Muddy River Subbasin, and less than 1 percent was from the combined inflows of Laundry and Faneuil Brooks. The remaining ungaged drainage area contributed about 2 percent of the total annual inflow to the lower Charles River. Excluding discharge from the Charles River above Watertown Dam, total annual runoff to the lower Charles River was 1,240 million cubic feet; 39 percent was from the Stony Brook Subbasin, 27 percent was from the Muddy River, which includes runoff that drains to the Muddy River conduit, 7 percent was from the Laundry Brook Subbasin, and 4 percent was from the Faneuil Brook Subbasin. Flow from the ungaged areas composed about 23 percent of the total annual inflow to the lower Charles River, excluding discharge from the Charles River above Watertown Dam. Runoff to the lower Charles River was calculated for two design storms representing a 3-month and a 1-year event, 1.84 and 2.79 inches of total rainfall, respectively. These simulated discharges were provided to the Massachusetts Water Resources Authority for use in a receiving-water model of the lower Charles River. Total storm runoff to the lower Charles River was 111 and 257 million cubic feet for the 3-month and 1-year storms, respectively. Excluding discharge from the Charles River above Watertown Dam, total runoff to the lower Charles River was 30 and 53 million cubic feet for the 3-month and 1-year storms, respectively. Runoff from
78 FR 47695 - Sam Rayburn Dam Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...
Geomorphology and American dams: The scientific, social, and economic context
NASA Astrophysics Data System (ADS)
Graf, William L.
2005-10-01
American geomorphologic research related to dams is embedded in a complicated context of science, policy, economics, and culture. Research into the downstream effects of large dams has progressed to the point of theory-building, but generalization and theory-building are from this research because (1) it is highly focused on a few locations, (2) it concerns mostly very large dams rather than a representative sample of sizes, (3) the available record of effects is too short to inform us on long-term changes, (4) the reversibility of changes imposed by dam installation and operation is unknown, and (5) coordinated funding for the needed research is scarce. In the scientific context, present research is embedded in a history of geomorphology in government service, with indistinct boundaries between "basic and applied" research. The federal policy that most strongly influences present geomorphological investigations connected with dams is related to habitat for endangered species, because the biological aspects of ecosystems are directly dependent on the substrate formed by the sediments and landforms that are influenced by dams. The economic context for research includes large amounts of public funds for river restoration, along with substantial private investments in dams; and geomorphology is central to these expensive issues. The cultural context for research is highly contentious and dominated by advocacy procedures that include intense scrutiny of any geomorphologic research related to dams. Advocates are likely to use the products of geomorphological research to make cases for their own positions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jonasson, Brian C.; Carmichael, Richard W.; Keefe, MaryLouise
1997-09-01
Historically, the Grande Ronde River produced an abundance of salmonids including stocks of spring, summer and fall chinook salmon, sockeye salmon, coho salmon, and summer steelhead. During the past century, numerous factors have caused the reduction of salmon stocks such that only sustainable stocks of spring chinook salmon and summer steelhead remain. The sizes of spring chinook salmon populations in the Grande Ronde River basin also have been declining steadily and are substantially depressed from estimates of historic levels. In addition to a decline in population abundance, a reduction of spring chinook salmon spawning distribution is evident in the Grandemore » Ronde River basin. Numerous factors are thought to contribute to the decline of spring chinook salmon in the Snake River and its tributaries. These factors include passage problems and increased mortality of juvenile and adult migrants at mainstem Columbia and Snake river dams, overharvest, and habitat degradation associated with timber, agricultural, and land development practices. This study was designed to describe aspects of the life history strategies exhibited by spring chinook salmon in the Grande Ronde River basin. During the past year the focus was on rearing and migration patterns of juveniles in the upper Grande Ronde River and Catherine Creek. The study design included three objectives: (1) document the annual in-basin migration patterns for spring chinook salmon juveniles in the upper Grande Ronde River and Catherine Creek, including the abundance of migrants, migration timing and duration; (2) estimate and compare smolt survival indices to mainstem Columbia and Snake river dams for fall and spring migrating spring chinook salmon; and (3) determine summer and winter habitat utilization and preference of juvenile spring chinook salmon in the upper Grande Ronde River and Catherine Creek.« less
Li, Na; Wang, Lachun; Zeng, Chunfen; Wang, Dong; Liu, Dengfeng; Wu, Xutong
2016-01-01
On the basis of monthly runoff series obtained in 1950–2013 and annual sediment load measured in 1956–-2013 at five key hydrological stations in the middle and lower reaches of the Yangtze River basin, this study used the Mann-Kendall methods to identify trend and abrupt changes of runoff and sediment load in relation to human activities. The results were as follows: (1) The annual and flood season runoffs showed significant decreasing trends at Yichang station, and showed slight downward trends at Hankou and Datong stations, while the abrupt changes of dry season runoff at Yichang, Hankou and Datong stations occurred in about 2007 and the change points were followed by significant increasing trends. The construction of the Three Gorges Dam, which began to operate in 2003, influenced the variations of runoff in the mainstream of Yangtze River, but the effect weakened with the distance along the downstream direction from TGD. (2) Since the 1990s, annual sediment loads at Yichang, Hankou, and Datong stations have been decreasing significantly, and after 2002, the annual sediment load at Yichang dropped below that of Hankou and Datong. The dams and deforestation/forestation contributed to the significant decreasing trend of the sediment load. In addition, the Three Gorges Dam aggravated the downward trend and caused the erosion of the riverbed and riverbanks in the middle and lower reaches. (3) The runoff and sediment load flowing from Dongting Lake into the mainstream of the Yangtze River showed significant decreasing trends at Chenglingji station after 1970s, and in contrast, slight increase in the sediment flow from Poyang Lake to the mainstream of the Yangtze River at Hukou station were detected over the post-TGD period (2003–2013). The result of the study will be an important foundation for watershed sustainable development of the Yangtze River under the human activities. PMID:27479591
Li, Na; Wang, Lachun; Zeng, Chunfen; Wang, Dong; Liu, Dengfeng; Wu, Xutong
2016-01-01
On the basis of monthly runoff series obtained in 1950-2013 and annual sediment load measured in 1956--2013 at five key hydrological stations in the middle and lower reaches of the Yangtze River basin, this study used the Mann-Kendall methods to identify trend and abrupt changes of runoff and sediment load in relation to human activities. The results were as follows: (1) The annual and flood season runoffs showed significant decreasing trends at Yichang station, and showed slight downward trends at Hankou and Datong stations, while the abrupt changes of dry season runoff at Yichang, Hankou and Datong stations occurred in about 2007 and the change points were followed by significant increasing trends. The construction of the Three Gorges Dam, which began to operate in 2003, influenced the variations of runoff in the mainstream of Yangtze River, but the effect weakened with the distance along the downstream direction from TGD. (2) Since the 1990s, annual sediment loads at Yichang, Hankou, and Datong stations have been decreasing significantly, and after 2002, the annual sediment load at Yichang dropped below that of Hankou and Datong. The dams and deforestation/forestation contributed to the significant decreasing trend of the sediment load. In addition, the Three Gorges Dam aggravated the downward trend and caused the erosion of the riverbed and riverbanks in the middle and lower reaches. (3) The runoff and sediment load flowing from Dongting Lake into the mainstream of the Yangtze River showed significant decreasing trends at Chenglingji station after 1970s, and in contrast, slight increase in the sediment flow from Poyang Lake to the mainstream of the Yangtze River at Hukou station were detected over the post-TGD period (2003-2013). The result of the study will be an important foundation for watershed sustainable development of the Yangtze River under the human activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, James H.; Poe, Thomas P.
1993-12-01
Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which weremore » salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.« less
Channel evolution on the dammed Elwha River, Washington, USA
Draut, A.E.; Logan, J.B.; Mastin, M.C.
2011-01-01
Like many rivers in the western U.S., the Elwha River, Washington, has changed substantially over the past century in response to natural and human forcing. The lower river is affected by two upstream dams that are slated for removal as part of a major river restoration effort. In preparation for studying the effects of dam removal, we present a comprehensive field and aerial photographic analysis of dam influence on an anabranching, gravel-bed river. Over the past century with the dams in place, loss of the upstream sediment supply has caused spatial variations in the sedimentary and geomorphic character of the lower Elwha River channel. Bed sediment is armored and better sorted than on the naturally evolving bed upstream of the dams. On time scales of flood seasons, the channel immediately below the lower dam is fairly stable, but progresses toward greater mobility downstream such that the lowermost portion of the river responded to a recent 40-year flood with bank erosion and bed-elevation changes on a scale approaching that of the natural channel above the dams. In general, channel mobility in the lowest 4 km of the Elwha River has not decreased substantially with time. Enough fine sediment remains in the floodplain that – given sufficient flood forcing – the channel position, sinuosity, and braiding index change substantially. The processes by which this river accesses new fine sediment below the dams (rapid migration into noncohesive banks and avulsion of new channels) allow it to compensate for loss of upstream sediment supply more readily than would a dammed river with cohesive banks or a more limited supply of alluvium. The planned dam removal will provide a valuable opportunity to evaluate channel response to the future restoration of natural upstream sediment supply.
Braatne, Jeffrey H.; Goater, Lori A.; Blair, Charles L.
2007-01-01
River damming provides a dominant human impact on river environments worldwide, and while local impacts of reservoir flooding are immediate, subsequent ecological impacts downstream can be extensive. In this article, we assess seven research strategies for analyzing the impacts of dams and river flow regulation on riparian ecosystems. These include spatial comparisons of (1) upstream versus downstream reaches, (2) progressive downstream patterns, or (3) the dammed river versus an adjacent free-flowing or differently regulated river(s). Temporal comparisons consider (4) pre- versus post-dam, or (5) sequential post-dam conditions. However, spatial comparisons are complicated by the fact that dams are not randomly located, and temporal comparisons are commonly limited by sparse historic information. As a result, comparative approaches are often correlative and vulnerable to confounding factors. To complement these analyses, (6) flow or sediment modifications can be implemented to test causal associations. Finally, (7) process-based modeling represents a predictive approach incorporating hydrogeomorphic processes and their biological consequences. In a case study of Hells Canyon, the upstream versus downstream comparison is confounded by a dramatic geomorphic transition. Comparison of the multiple reaches below the dams should be useful, and the comparison of Snake River with the adjacent free-flowing Salmon River may provide the strongest spatial comparison. A pre- versus post-dam comparison would provide the most direct study approach, but pre-dam information is limited to historic reports and archival photographs. We conclude that multiple study approaches are essential to provide confident interpretations of ecological impacts downstream from dams, and propose a comprehensive study for Hells Canyon that integrates multiple research strategies. PMID:18043964
Influence of El Niño Southern Oscillation on global hydropower production
NASA Astrophysics Data System (ADS)
Ng, Jia Yi; Turner, Sean W. D.; Galelli, Stefano
2017-03-01
El Niño Southern Oscillation (ENSO) strongly influences the global climate system, affecting hydrology in many of the world’s river basins. This raises the prospect of ENSO-driven variability in global and regional hydroelectric power generation. Here we study these effects by generating time series of power production for 1593 hydropower dams, which collectively represent more than half of the world’s existing installed hydropower capacity. The time series are generated by forcing a detailed dam model with monthly-resolution, 20th century inflows—the model includes plant specifications, storage dynamics and realistic operating schemes, and runs irrespectively of the dam construction year. More than one third of simulated dams exhibit statistically significant annual energy production anomalies in at least one of the two ENSO phases of El Niño and La Niña. For most dams, the variability of relative anomalies in power production tends to be less than that of the forcing inflows—a consequence of dam design specifications, namely maximum turbine release rate and reservoir storage, which allows inflows to accumulate for power generation in subsequent dry years. Production is affected most prominently in Northwest United States, South America, Central America, the Iberian Peninsula, Southeast Asia and Southeast Australia. When aggregated globally, positive and negative energy production anomalies effectively cancel each other out, resulting in a weak and statistically insignificant net global anomaly for both ENSO phases.
Increasing drought risk in large-dam basins of South Korea
NASA Astrophysics Data System (ADS)
Jung, I. W.; Shin, Y.; Park, J.; Kim, D.
2017-12-01
In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.
NASA Astrophysics Data System (ADS)
Ho, Michelle; Lall, Upmanu; Sun, Xun; Cook, Edward
2017-04-01
Large-scale water storage infrastructure in the Conterminous United States (CONUS) provides a means of regulating the temporal variability in water supply with storage capacities ranging from seasonal storage in the wetter east to multi-annual and decadal-scale storage in the drier west. Regional differences in water availability across the CONUS provides opportunities for optimizing water dependent economic activities, such as food and energy production, through storage and transportation. However, the ability to sufficiently regulate water supplies into the future is compromised by inadequate monitoring of non-federally-owned dams that make up around 97% of all dams. Furthermore, many of these dams are reaching or have exceeded their economic design life. Understanding the role of dams in the current and future landscape of water requirements in the CONUS is needed to prioritize dam safety remediation or identify where redundant dams may be removed. A national water assessment and planning process is needed for addressing water requirements, accounting for regional differences in water supply and demand, and the role of dams in such a landscape. Most dams in the CONUS were designed without knowledge of devastating floods and prolonged droughts detected in multi-centennial paleoclimate records, consideration of projected climate change, nor consideration of optimal operation across large-scale regions. As a step towards informing water supply across the CONUS we present a paleoclimate reconstruction of annual streamflow across the CONUS over the past 555 years using a spatially and temporally complete paleoclimate record of summer drought across the CONUS targeting a set of US Geological Survey streamflow sites. The spatial and temporal structures of national streamflow variability are analyzed using hierarchical clustering, principal component analysis, and wavelet analyses. The reconstructions show signals of contemporary droughts such as the Dust Bowl (1930s) and 1950s droughts. Decadal-scale variability was detected in the late 1900s in the western US, however, similar modes of temporal variability were rarely present prior to the 1950s. The 20th century featured longer wet spells and shorter dry spells compared with the preceding 450 years. Streamflow in the Pacific Northwest and Northeast are negatively correlated with the central US suggesting the potential to mitigate some drought impacts by balancing economic activities and insurance pools across these regions during major droughts. The converging issues of a slowly growing US population, evolving demands for food, energy, and water, aging dams, and reduced water storage capacity through decommissioning and sedimentation highlights the pressing need for a national water assessment and a subsequent national water plan. There are many factors that need to be understood in order to appropriately assess dam and reservoir requirements across the CONUS and to improve water use and flood protection efficiency. In addition to historical and paleoclimate-informed surface water supply, factors requiring consideration in planning for future dam and reservoir infrastructure include: -the role of conjunctive surface and groundwater storage and use; -basin-scale operational strategies to balance sectoral water demand; -projections of surface water supply; -projections of regional water demands; -impacts of water conservation; and -the influence of water policy and financial instruments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buchanan, Rebecca A.; Skalski, John R.
2007-12-07
In 2005, the University of Washington developed a new statistical model to analyze the combined juvenile and adult detection histories of PIT-tagged salmon migrating through the Federal Columbia River Power System (FCRPS). This model, implemented by software Program ROSTER (River-Ocean Survival and Transportation Effects Routine), has been used to estimate survival and transportation effects on large temporal and spatial scales for PIT-tagged hatchery spring and summer Chinook salmon and steelhead released in the Snake River Basin from 1996 to 2003. Those results are reported here. Annual estimates of the smolt-to-adult return ratio (SAR), juvenile inriver survival from Lower Granite tomore » Bonneville, the ocean return probability from Bonneville to Bonneville, and adult upriver survival from Bonneville to Lower Granite are reported. Annual estimates of transport-inriver (T/I) ratios and differential post-Bonneville mortality (D) are reported on both a systemwide basis, incorporating all transport dams analyzed, and a dam-specific basis. Transportation effects are estimated only for dams where at least 5,000 tagged smolts were transported from a given upstream release group. Because few tagged hatchery steelhead were transported in these years, no transportation effects are estimated for steelhead. Performance measures include age-1-ocean adult returns for steelhead, but not for Chinook salmon. Annual estimates of SAR from Lower Granite back to Lower Granite averaged 0.71% with a standard error (SE) of 0.18% for spring Chinook salmon from the Snake River Basin for tagged groups released from 1996 through 2003, omitting age-1-ocean (jack) returns. For summer Chinook salmon from the Snake River Basin, the estimates of annual SAR averaged 1.15% (SE=0.31%). Only for the release years 1999 and 2000 did the Chinook SAR approach the target value of 2%, identified by the NPCC as the minimum SAR necessary for recovery. Annual estimates of SAR for hatchery steelhead from the Snake River Basin averaged 0.45% (SE=0.11%), including age-1-ocean returns, for release years 1996 through 2003. For release years when the ocean return probability from Bonneville back to Bonneville could be estimated (i.e., 1999 through 2003), it was estimated that on average approximately 86% of the total integrated mortality for nontransported, tagged hatchery spring and summer Chinook, and 74% for steelhead, occurred during the ocean life stage (i.e., from Bonneville to Bonneville). This suggests that additional monitoring and research efforts should include the ocean and estuary environment. Annual estimates of the systemwide T/I are weighted averages of the dam-specific T/I ratios for each transport dam (with {ge} 5,000 tagged fish transported), weighted by the probabilities of being transported at each dam. The systemwide T/I compares the observed SAR under the existing transportation system with the expected SAR if the transportation system had not been operated. Estimates of 1.0 indicate that the systemwide transportation program has no effect on SAR, while estimates > 1.0 indicate that the transportation program increases SAR. Excluding the 2001 release group, the geometric mean of the systemwide T/I estimates for hatchery spring Chinook salmon from the Snake River Basin was 1.15 (SE=0.03) for release years 1997 through 2003. The geometric mean of the systemwide T/I estimates for hatchery summer Chinook salmon from the Snake River Basin was 1.28 (SE=0.13) for release years 1997 through 2000 and 2003. Estimates were much higher for the 2001 release groups. These estimates reflect transportation from Lower Granite and/or Little Goose for most release years, depending on the number of tagged smolts actually transported at each dam during each release year. Differential post-Bonneville mortality (D) is the ratio of post-Bonneville survival to Lower Granite Dam of transported fish to that of nontransported ('inriver') fish. Excluding the 2001 release year, the geometric mean of the D estimates for hatchery spring Chinook salmon from the Snake River Basin was 1.00 (SE=0.09) for release years 1997 through 2003. For hatchery summer Chinook salmon from the Snake River Basin, the geometric mean of the D estimates was 1.32 (SE=0.27) for release years 1997 through 2000 and 2003. These estimates reflect transportation from Lower Granite and/or Little Goose, depending on the number of tagged smolts actually transported at each dam during each release year. Approximately half the point estimates of D for both spring and summer Chinook salmon were 1.0 or greater, indicating that for those release groups, transported fish did not have lower ocean and adult survival than nontransported fish. For those years with estimates of D < 1.0, the systemwide T/I estimates were always {ge} 1.0, indicating that despite lower ocean and adult survival of transported fish, transportation did not lower SAR overall.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fish Passage Center
1986-02-01
Volume I of this report describes the results of travel time monitoring and other migrational characteristics of yearling and sub-yearling chinook salmon (Oncorhynchus tshawytscha), sockeye salmon (Oncorhynchus nerka), and steelhead trout (Salmo gairdneri). This volume presents the freeze brand data used in the analysis of travel time for Lower Granite, Rock Island, McNary, and John Day dams. Brand recoveries for Lower Monumental dam also are presented. Summary of data collection procedures and explanation of data listings are presented in conjunction with the mark recapture data.
The management of the Diama reservoir (Senegal River)
NASA Astrophysics Data System (ADS)
Duvail, S.; Hamerlynck, O.
2003-04-01
The Senegal River is regulated by 2 dams built in the 1980's by the "Organisation pour la Mise en Valeur du fleuve Sénégal" (OMVS), a river basin management organisation grouping Mali, Senegal and Mauritania. The initial objectives of OMVS, which were to regulate the Senegal flows in order to develop irrigated agriculture, produce hydropower and facilitate river navigation has been only partially met. The maintenance of the annual flood by the upstream dam (Manantali), initially to be phased out when irrigated agriculture would have replaced the traditional recession agriculture, is now scheduled to continue indefinitely on the basis of socio-economic and environmental concerns. This change of mindset has however not affected the management of the downstream dam (Diama). Initially conceived as a salt-wedge dam, its function evolved to a reservoir dam with a high and constant water level. During the dry season, the water level is maintained high and constant in order to reduce the pumping costs for the irrigated agriculture in the delta. During the flood season (July-October) the dam is primarily managed for risk avoidance: limit flooding downstream of the dam (especially the city of St. Louis) and secure the infrastructure of the dam itself. The permanent freshwater reservoir lake has adverse effects on ecosystems, on human and animal health and a high social cost for the traditional stakeholders of the deltaic floodplain (fishermen, livestock keepers and gatherers). Upstream of the reservoir there is an excess of stagnant freshwater and managers are confronted with the development of invasive species while substantial downstream flooding is essential for the estuarine ecosystems and local livelihoods. The presentation will review the different approaches to the management of the Diama reservoir and proposes different management scenarios and compares their economical, environmental, and social costs and benefits.
Hydro-geomorphology of the middle Elwha River, Washington, following dam removal
NASA Astrophysics Data System (ADS)
Morgan, J. A.; Nelson, P. A.; Brogan, D. J.
2017-12-01
Dam removal is an increasingly common river restoration practice, which can produce dramatic increases in sediment supply to downstream reaches. There remains, however, considerable uncertainty in how mesoscale morphological units (e.g., riffles and pools) respond to the flow and sediment supply changes associated with dam removal. The recent removal of Glines Canyon Dam on the Elwha River in Washington State provides a natural setting to explore how increased sediment supply due to dam removal may affect downstream reaches. Here, we present observations and surveys documenting how a 1 km reach, located approximately 5 km downstream of the former dam site, has evolved following dam removal. Annual topographic/bathymetric surveys were conducted in 2014-2016 using RTK-GNSS methods, and these surveys were coupled with airborne lidar to create continuous surface maps of the valley bottom. Differencing the elevation models reveals channel widening and migration due to lateral bank retreat and bar aggradation. Analysis of aerial imagery dating back to 1939 suggests that rates of both widening and meander migration have increased following dam removal. We also used results from depth-averaged hydrodynamic modeling with a fuzzy c-means clustering approach to delineate riffle and pool units; this analysis suggests that both riffles and pools stayed relatively consistent from 2014-2015, while both areas decreased from 2015 to 2016. Without any considerable changes to the hydrologic regime these higher rates of change are implied to be the result of the increased sediment supply. Our results, which indicate an increased dynamism due directly to the amplified sediment supply, have the potential to further inform river managers and restoration specialists who oversee projects related to changing sediment regimes.
Topping, David J.; Rubin, David M.; Vierra, L.E.
2000-01-01
Analyses of flow, sediment‐transport, bed‐topographic, and sedimentologic data suggest that before the closure of Glen Canyon Dam in 1963, the Colorado River in Marble and Grand Canyons was annually supply‐limited with respect to fine sediment (i.e., sand and finer material). Furthermore, these analyses suggest that the predam river in Glen Canyon was not supply‐limited to the same degree and that the degree of annual supply limitation increased near the head of Marble Canyon. The predam Colorado River in Grand Canyon displays evidence of four effects of supply limitation: (1) seasonal hysteresis in sediment concentration, (2) seasonal hysteresis in sediment grain size coupled to the seasonal hysteresis in sediment concentration, (3) production of inversely graded flood deposits, and (4∥ development or modification of a lag between the time of a flood peak and the time of either maximum or minimum (depending on reach geometry) bed elevation. Analyses of sediment budgets provide additional support for the interpretation that the predam river was annually supply‐limited with respect to fine sediment, but it was not supply‐limited with respect to fine sediment during all seasons. In the average predam year, sand would accumulate and be stored in Marble Canyon and upper Grand Canyon for 9 months of the year (from July through March) when flows were dominantly below 200–300 m3/s; this stored sand was then eroded during April through June when flows were typically higher. After closure of Glen Canyon Dam, because of the large magnitudes of the uncertainties in the sediment budget, no season of substantial sand accumulation is evident. Because most flows in the postdam river exceed 200–300 m3/s, substantial sand accumulation in the postdam river is unlikely.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.
2008-11-25
Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugertmore » et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.« less
NASA Astrophysics Data System (ADS)
Hoang, L. P.; van Vliet, M. T. H.; Lauri, H.; Kummu, M.; Koponen, J.; Supit, I.; Leemans, R.; Kabat, P.; Ludwig, F.
2016-12-01
The Mekong River's flows and water resources are in many ways essential for sustaining economic growths, flood security of about 70 million people and biodiversity in one of the world's most ecologically productive wetland systems. The river's hydrological cycle, however, are increasingly perturbed by climate change, large-scale hydropower developments and rapid irrigated land expansions. This study presents an integrated impact assessment to characterize and quantify future hydrological changes induced by these driving factors, both separately and combined. We have integrated a crop simulation module and a hydropower dam module into a distributed hydrological model (VMod) and simulated the Mekong's hydrology under multiple climate change and development scenarios. Our results show that the Mekong's hydrological regime will experience substantial changes caused by the considered factors. Magnitude-wise, hydropower dam developments exhibit the largest impacts on river flows, with projected higher flows (up to +35%) during the dry season and lower flows (up to -44%) during the wet season. Annual flow changes caused by the dams, however, are relatively marginal. In contrast to this, climate change is projected to increase the Mekong's annual flows (up to +16%) while irrigated land expansions result in annual flow reductions (-1% to -3%). Combining the impacts of these three drivers, we found that river flow changes, especially those at the monthly scale, largely differ from changes under the individual driving factors. This is explained by large differences in impacts' magnitudes and contrasting impacts' directions for the individual drivers. We argue that the Mekong's future flows are likely driven by multiple factors and thus advocate for integrated assessment approaches and tools that support proper considerations of these factors and their interplays.
Mellman-Brown, Sabine; Roberts, Dave; Pugesek, Bruce H.
2008-01-01
The hydrology of the Snake River in Grand Teton National Park is partly determined by releases from Jackson Lake Dam. The dam was first built in 1908 and became part of the National Park system when GTNP was expanded to include most of Jackson Hole. Completion of the present structure of Jackson Lake Dam occurred in 1917 and resulted in an increase above the natural level of Jackson Lake of 11.9 m. The Bureau of Reclamation (BOR) manages the dam and sets discharge schedules, primarily to meet agricultural needs, and to a lesser extent the needs of recreational river use. Major changes to the hydrological regime of the Snake River include lower than natural peak releases, decrease in frequency of extreme flood events , and unusually high flows from July to September. In addition , peak releases prior to 1957 were not synchronized with spring runoff but shifted to July or early August. Changes in inundation frequencies of floodplains , inundation duration and timing of peak flows have profound effects on the extent and composition of the riparian zone.
Matsche, Mark A; Gibbons, Jarrett
2012-12-01
Shortnose sturgeon (Acipenser brevirostrum) spawning migrations on the Cooper River are impeded by Pinopolis Dam, Lake Moultrie, South Carolina. Sturgeon and other species aggregate below the dam in late winter/early spring and are subjected to a variety of stressors stemming from crowding, poor habitat quality, and injuries that appear to be caused by boat propeller or turbine strikes. Spawning has been documented in the tailrace, but reproductive success has not been verified as no juveniles have been captured. Fish within the dam tailrace were captured by gill net during winter, 2005 and 2007-2011, and physiological condition was assessed using a panel of hematologic and biochemical indices. Plasma phosphorus and calcium were significantly higher in females, while PCV and aspartate aminotransferase were significantly higher in males, indicating sex-specific physiological changes triggered during maturity. A marked leucopenia, accompanied by lymphopenia and neutrophilia, was evident in both sexes and was consistent across years, indicating that these fish were under chronic stress. Testosterone and estradiol levels and hematologic and biochemical reference intervals are provided for comparative purposes.
Earth observations taken during STS-102 flight
2001-03-18
STS102-303-017 (8-21 March 2001)--- The STS-102 crew members used a 35mm camera on the flight deck of the Space Shuttle Discovery to record this image of the Aswan High Dam. The structure was completed in 1970 and is one of the largest earthen embankment dams in the world. It is 364 feet (111 meters) tall, 12,565 feet (3,830 meters) long and nearly 3,281 feet (1,000 meters) wide. When it was built the new reservoir required relocation of nearly 100,000 residents and some archaeological sites. Although the reservoir has benefited Egypt by providing power and controlling floods, according to NASA scientists, it has also had detrimental effects on the Nile system. Before the dam, an estimated 110 million tons of silt was deposited by the annual flood of the Nile, enriching agricultural lands and maintaining the land of the Nile delta. Now this sediment is trapped behind the dam, requiring artificial fertilization of agricultural lands and leading to erosion and saltwater intrusion where the Nile river meets the Mediterranean Sea.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, John G.; Bjomn
1997-03-01
In 1994, the National Marine Fisheries Service and the US Fish and Wildlife Service began a cooperative study to investigate migrational characteristics of subyearling fall chinook salmon in the Snake River. The primary study objectives were to (1) determine the feasibility of estimating detection and passage survival probabilities of natural and hatchery subyearling fall chinook salmon released in the Snake River (Chapter 1), (2) investigate relationships between detection and passage survival probabilities and travel time of subyearling fall chinook salmon and environmental influences such as flow volume and water temperature (Chapter 1), (3) monitor and evaluate dispersal of hatchery subyearlingmore » chinook salmon into nearshore rearing areas used by natural fish (Chapter 2), and (4) monitor and evaluate travel time to Lower Granite Dam, growth from release in the Snake River to recapture at Lower Granite Dam, ATPase levels of fish recaptured at Lower Granite Dam, and survival from release in the free-flowing Snake River to the tailrace of Lower Granite Dam (Chapter 2).« less
Development of probabilistic operating rules for Hluhluwe Dam, South Africa
NASA Astrophysics Data System (ADS)
Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.
2017-08-01
Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paragamian, Valughn L.; Laude Dorothy C.
2008-12-26
Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C)more » until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.« less
Long-term trend analysis on total and extreme precipitation over Shasta Dam watershed.
Toride, Kinya; Cawthorne, Dylan L; Ishida, Kei; Kavvas, M Levent; Anderson, Michael L
2018-06-01
California's interconnected water system is one of the most advanced water management systems in the world, and understanding of long-term trends in atmospheric and hydrologic behavior has increasingly being seen as vital to its future well-being. Knowledge of such trends is hampered by the lack of long-period observation data and the uncertainty surrounding future projections of atmospheric models. This study examines historical precipitation trends over the Shasta Dam watershed (SDW), which lies upstream of one of the most important components of California's water system, Shasta Dam, using a dynamical downscaling methodology that can produce atmospheric data at fine time-space scales. The Weather Research and Forecasting (WRF) model is employed to reconstruct 159years of long-term hourly precipitation data at 3km spatial resolution over SDW using the 20th Century Reanalysis Version 2c dataset. Trend analysis on this data indicates a significant increase in total precipitation as well as a growing intensity of extreme events such as 1, 6, 12, 24, 48, and 72-hour storms over the period of 1851 to 2010. The turning point of the increasing trend and no significant trend periods is found to be 1940 for annual precipitation and the period of 1950 to 1960 for extreme precipitation using the sequential Mann-Kendall test. Based on these analysis, we find the trends at the regional scale do not necessarily apply to the watershed-scale. The sharp increase in the variability of annual precipitation since 1970s is also detected, which implies an increase in the occurrence of extreme wet and dry conditions. These results inform long-term planning decisions regarding the future of Shasta Dam and California's water system. Copyright © 2018 Elsevier B.V. All rights reserved.
Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam
NASA Astrophysics Data System (ADS)
Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.
2016-12-01
The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.
Tiffan, Kenneth F.; Kock, Tobias J.; Connor, William P.
2007-01-01
During the winter of 2005-06, we radio and PIT tagged and released 48 juvenile fall Chinook salmon to evaluate over-wintering behavior and dam passage in the lower Snake River, Washington. Fish were released at the upstream end of the Lower Granite Dam forebay in November and December 2005. Fixed radio telemetry detection sites located in forebay and tailrace areas of Lower Granite, Little Goose, Lower Monumental and Ice Harbor dams were used to monitor fish movements and dam passage through early-May 2006. Of the 48 fish released during our study, 39 (81 %) passed Lower Granite Dam and were detected at downstream detection sites, 29 (60%) passed Little Goose Dam, 25 (52%) passed Lower Monumental Dam, and 15 (31%) passed Ice Harbor Dam. Thirty-seven (95%), 23 (79%), 16 (64%), and 9 (60%) of the fish that passed Lower Granite, Little Goose, Lower Monumental, and Ice Harbor dams respectively, did so when the fish bypass system was not operated. Passage of tagged fish past lower Snake River dams generally declined during the winter, but increased again after bypass began in April. Fish residence times in reservoirs and forebays was lengthy during the winter (up to 118 d), and varied by reservoir and time of year. We observed no diel passage trends. Only 15 of the 48 fish were subsequently detected at a PIT-tag interrogation site the following spring. We believe that passage of overwintering juvenile fall Chinook salmon during winter is due more to chance than directed downstream movement. Since the primary route of passage during the winter is through powerhouse turbines, the potential exists for increased mortality for over-wintering juvenile fall Chinook salmon in the Snake River. Our findings also have implications for transportation studies of subyearling fall Chinook salmon in the Snake River. Specifically, the finding that some fish can pass undetected during the winter may bias smolt-to-adult return rate calculations that are typically used to measure the success of the aforementioned management actions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beiningen, Kirk T.
The author reports on progress from April 1994 through March 1995 of research on white sturgeon in the lower Columbia River. The study began in July 1986 and is a cooperative effort of federal, state and tribal fisheries entities to determine the (1) the status and habitat requirements, and (2) the effects of mitigative measures on productivity of white sturgeon populations in the lower Columbia River. This report describes activities conducted during the third year of this contract's second phase. Information was collected, analyzed, and evaluated on sub-adult and adult life histories, population dynamics, quantity and quality of habitat, andmore » production enhancement strategies. The report is divided into sections that evaluate success of developing and implementing a management plan for white sturgeon; evaluate growth, mortality, and contributions to fisheries of juvenile white sturgeon transplanted from areas downstream; describe the life history and population dynamics of sub-adult a nd adult white sturgeon; define habitat requirements for spawning and rearing of white sturgeon and quantify the extent of habitat available; describe reproductive and early life history characteristics of white sturgeon; and quantify physical habitat used by spawning and rearing white sturgeon in the free-flowing portion of the Columbia River.« less
Principles of health economic evaluations of lipid-lowering strategies.
Ara, Roberta; Basarir, Hasan; Ward, Sue Elizabeth
2012-08-01
Policy decision-making in cardiovascular disease is increasingly informed by the results generated from decision-analytic models (DAMs). The methodological approaches and assumptions used in these DAMs impact on the results generated and can influence a policy decision based on a cost per quality-adjusted life year (QALY) threshold. Decision makers need to be provided with a clear understanding of the key sources of evidence and how they are used in the DAM to make an informed judgement on the quality and appropriateness of the results generated. Our review identified 12 studies exploring the cost-effectiveness of pharmaceutical lipid-lowering interventions published since January 2010. All studies used Markov models with annual cycles to represent the long-term clinical pathway. Important differences in the model structures and evidence base used within the DAMs were identified. Whereas the reporting standards were reasonably good, there were many instances when reporting of methods could be improved, particularly relating to baseline risk levels, long-term benefit of treatment and health state utility values. There is a scope for improvement in the reporting of evidence and modelling approaches used within DAMs to provide decision makers with a clearer understanding of the quality and validity of the results generated. This would be assisted by fuller publication of models, perhaps through detailed web appendices.
Ethiopia's Grand Renaissance Dam: Implications for Downstream Riparian Countries
NASA Astrophysics Data System (ADS)
Zhang, Y.; Block, P. J.; Hammond, M.; King, A.
2013-12-01
Ethiopia has begun seriously developing their significant hydropower potential by launching construction of the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile River to facilitate local and regional growth. Although this has required substantial planning on Ethiopia's part, no policy dictating the reservoir filling rate strategy has been publicly issued. This filling stage will have clear implications on downstream flows in Sudan and Egypt, complicated by evaporative losses, climate variability, and climate change. In this study, various filling policies and future climate states are simultaneously explored to infer potential streamflow reductions at Lake Nasser, providing regional decision-makers with a set of plausible, justifiable, and comparable outcomes. Schematic of the model framework Box plots of 2017-2032 percent change in annual average streamflow at Lake Nasser for each filling policy constructed from the 100 time-series and weighted precipitation changes. All values are relative to the no dam policy and no changes to future precipitation.
Ellsworth, Craig M.; VanderKooi, Scott P.
2011-01-01
The Chiloquin Dam was located at river kilometer (rkm) 1.3 on the Sprague River near the town of Chiloquin, Oregon. The dam was identified as a barrier that potentially inhibited or prevented the upstream spawning migrations and other movements of endangered Lost River suckers (Deltistes luxatus), shortnose suckers (Chasmistes brevirostris), and other fish in the Sprague River. Our research objectives in 2009 were to evaluate adult catostomid spawning migration patterns using radio telemetry to identify and describe shifts in spawning area distribution and migration behavior following the removal of Chiloquin Dam in 2008. We attached external radio transmitters to 58 Lost River suckers and 59 shortnose suckers captured at the Williamson River fish weir. A total of 17 radio-tagged Lost River suckers and one radio-tagged shortnose sucker were detected approaching the site of the former Chiloquin Dam but only two radio-tagged fish (one male Lost River sucker and one female Lost River sucker) were detected crossing upstream of the dam site. A lower proportion of radio-tagged shortnose suckers were detected migrating into the Sprague River when compared with previous years. Detections on remote passive integrated transponder (PIT) tag arrays located in the Sprague River show that although the proportion of fish coming into the Sprague River is small when compared to the number of fish crossing the Williamson River fish weir, the number of fish migrating upstream of the Chiloquin Dam site increased exponentially in the first year since its removal. These data will be used in conjunction with larval production and adult spawning distribution data to evaluate the effectiveness of dam removal in order to provide increased access to underutilized spawning habitat located further upstream in the Sprague River and to reduce the crowding of spawning fish below the dam site.
Barton, Gary J.
2004-01-01
Many local, State, and Federal agencies have concerns over the declining population of white sturgeon (Acipenser transmontanus) in the Kootenai River and the possible effects of the closure and subsequent operation of Libby Dam in 1972. In 1994, the Kootenai River white sturgeon was listed as an Endangered Species. A year-long field study was conducted in cooperation with the Kootenai Tribe of Idaho along a 21.7-kilometer reach of the Kootenai River including the white sturgeon spawning reach near Bonners Ferry, Idaho, approximately 111 to 129 kilometers below Libby Dam. During the field study, data were collected in order to map the channel substrate in the white sturgeon spawning reach. These data include seismic subbottom profiles at 18 cross sections of the river and sediment cores taken at or near the seismic cross sections. The effect that Libby Dam has on the Kootenai River white sturgeon spawning substrate was analyzed in terms of changes in suspended-sediment transport, aggradation and degradation of channel bed, and changes in the particle size of bed material with depth below the riverbed. The annual suspended-sediment load leaving the Kootenai River white sturgeon spawning reach decreased dramatically after the closure of Libby Dam in 1972: mean annual pre-Libby Dam load during 1966–71 was 1,743,900 metric tons, and the dam-era load during 1973–83 was 287,500 metric tons. The amount of sand-size particles in three suspended-sediment samples collected at Copeland, Idaho, 159 kilometers below Libby Dam, during spring and early summer high flows after the closure of Libby Dam is less than in four samples collected during the pre-Libby Dam era. The supply of sand to the spawning reach is currently less due to the reduction of high flows and a loss of 70 percent of the basin after the closure of Libby Dam. The river's reduced capacity to transport sand out of the spawning reach is compensated to an unknown extent by a reduced load of sand entering the spawning reach. Since the closure of Libby Dam, the most notable change in channel geometry at the Copeland streamflow gaging station was the initiation of cyclical aggradation and degradation of the riverbed in the center of the channel. The aggradation and degradation of the riverbed are reflected in a twofold increase, from 1.3 to 2.5 meters, in the fluctuation of the minimum riverbed elevation, which suggests that during the Libby Dam era, parts of the riverbed in the spawning reach may have aggraded or degraded by as much as 2.5 meters. Before the closure of Libby Dam, there was a greater propensity for aggradation and degradation of sand over the discontinuous gravel and cobble layers in the buried gravelcobble reach at Bonners Ferry. The gravel and cobble in this reach, 111.3 to 115.9 kilometers below Libby Dam, are buried by sand. Unregulated spring snowmelt-runoff flows flushed part of the sand layer and exposed some of the buried gravel-cobble layer because streamflow velocities were higher at that time. Unregulated autumn-winter base flows gradually deposited silt and sand and reestablished a sand layer, burying the gravel-cobble layer. This cyclical process of aggradation and degradation of the riverbed sediment is reflected in the alternating gravel-cobble layers and sand layers found in sediment core K18-TH taken as part of this project. White sturgeon spawning substrate in the Kootenai River meander reach is currently composed of alluvial sand that forms sand dunes and of minor amounts of lacustrine clay and silt that generally are found in the river's thalweg. The present substrate composition in the meander reach is considered similar to that which existed prior to closure of Libby Dam, with one possible exception. Prior to closure of Libby Dam, minor amounts of gravel and cobble may have been exposed on the riverbed in the spawning reach just below the mouth of Myrtle Creek 230 kilometers below Libby Dam. The substrate composition near Shorty Island, 234 kilometers below Libby Dam, a notable white sturgeon spawning reach, is predominantly sand and is similar to that which existed prior to closure of Libby Dam.
Spokane Tribal Hatchery, 2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peone, Tim L.
2006-03-01
Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting harvestable fisheries for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). The Spokane Tribe, Washington Department of Fish and Wildlife, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Projectmore » are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area. The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and Lake Roosevelt Rainbow Trout Net Pen Rearing Projects. The Lake Roosevelt and Banks Lake Fisheries Evaluation Program monitor and evaluates release strategies and production methods for the aforementioned projects. Between 1985 and 2005 the projects have collectively produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 1.4 million kokanee fry for Banks Lake annually. In 2005, the annual release goal included 3.3 million kokanee fry, 475,000 kokanee yearlings and 500,000 rainbow trout yearlings. Fish produced by this project in 2005 to meet collective fish production and release goals included: 3,446,438 kokanee fingerlings, 347,730 rainbow trout fingerlings and 525,721 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Meadow Creek and Lake Whatcom kokanee, diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to rainbow trout catch and harvest rates while the impact on the kokanee fishery was minimal. Success of the Lake Roosevelt kokanee artificial production program appears to be limited primarily owing to predation, precocity and high entrainment rates through Grand Coulee Dam. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue kokanee fry and post-smolt releases, 100% triploid hatchery stock rainbow trout used and adipose fin clip hatchery stock rainbow trout prior to release. The Spokane Tribal Hatchery is funded by the Bonneville Power Administration under directives by the Northwest Power Conservation Council Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.« less
Friedman, Jonathan M.
2018-01-01
needs of other riverine resources. Use of high flows to remove unwanted vegetation is constrained by current operational guidance for Flaming Gorge Dam, which attempts to limit spills (i.e., flows greater than 8600 ft3 /s) that might contribute to cavitation and lead to dam safety concerns. Therefore, reversing vegetation encroachment is more likely to succeed if implemented while plants are still small. Annual monitoring of near-channel vegetation and topography would enable managers to prescribe a timely hydrologic response in case the proposed flow experiments lead to vegetation encroachment and habitat degradation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.
2004-01-01
This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited atmore » a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified (small-sized) Merwin trapnet. We found this floating trapnet to be very effective in catching northern pikeminnow at specific sites. Consequently, in 1993 we examined a system-wide fishery using floating trapnets, but found this fishery to be ineffective at harvesting large numbers of northern pikeminnow on a system-wide scale.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porter, Russell G.; Glaser, Bryce G.; Amren, Jennifer
2003-03-01
This report presents results for year ten in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited atmore » a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified (small-sized) Merwin trapnet. We found this floating trapnet to be very effective in catching northern pikeminnow at specific sites. Consequently, in 1993 we examined a system wide fishery using floating trapnets, but found this fishery to be ineffective at harvesting large numbers of northern pikeminnow on a system-wide scale. In 1994, we investigated the use of trapnets and gillnets at specific locations where concentrations of northern pikeminnow were known or suspected to occur during the spring season (i.e., March through early June). In addition, we initiated a concerted effort to increase public participation in the sport-reward fishery through a series of promotional and incentive activities. In 1995, 1996, and 1997, promotional activities and incentives were further improved based on the favorable response in 1994. Results of these efforts are subjects of this annual report under Section I, Implementation. Evaluation of the success of test fisheries in achieving our target goal of a 10-20% annual exploitation rate on northern pikeminnow is presented in Section II of this report. Overall program success in terms of altering the size and age composition of the northern pikeminnow population and in terms of potential reductions in loss of juvenile salmonids to northern pikeminnow predation is also discussed under Section II.« less
Effects of Wynoochee Dam on Anadromous Fish.
1980-10-01
RD-R149 774 EFFECTS OF IYNOOCHEE DAN ON RNRDROMOUS FISH(Ill WASHINGTON DEPT OF FISHERIES OLYMPIA S B MATHEWS OCT 88 DAC67-88-M-i76i UNCLASSIFIED F/G...partments of Fisheries and Game on the effects of the Wynoochee River dam, as well as an analysis of other pertinent data relating to the de- cline of fish...step taken for replacement or enhancement. COHO SALMON The sources consulted were 1) Washington Department of Fisheries ’ (WDF) progress report titled
Mueller, Erich R.; Grams, Paul E.; Schmidt, John C.; Hazel, Joseph E.; Alexander, Jason S.; Kaplinski, Matt
2014-01-01
Prior to the construction of large dams on the Green and Colorado Rivers, annual floods aggraded sandbars in lateral flow-recirculation eddies with fine sediment scoured from the bed and delivered from upstream. Flows greater than normal dam operations may be used to mimic this process in an attempt to increase time-averaged sandbar size. These controlled floods may rebuild sandbars, but sediment deficit conditions downstream from the dams restrict the frequency that controlled floods produce beneficial results. Here, we integrate complimentary, long-term monitoring data sets from the Colorado River in Marble and Grand Canyons downstream from Glen Canyon dam and the Green River in the Canyon of Lodore downstream from Flaming Gorge dam. Since the mid-1990s, several controlled floods have occurred in these canyon rivers. These controlled floods scour fine sediment from the bed and build sandbars in eddies, thus increasing channel relief. These changes are short-lived, however, as interflood dam operations erode sandbars within several months to years. Controlled flood response and interflood changes in bed elevation are more variable in Marble Canyon and Grand Canyon, likely reflecting more variable fine sediment supply and stronger transience in channel bed sediment storage. Despite these differences, neither system shows a trend in fine-sediment storage during the period in which controlled floods were monitored. These results demonstrate that controlled floods build eddy sandbars and increase channel relief for short interflood periods, and this response may be typical in other dam-influenced canyon rivers. The degree to which these features persist depends on the frequency of controlled floods, but careful consideration of sediment supply is necessary to avoid increasing the long-term sediment deficit.
Anderson, Elizabeth P.; Freeman, Mary C.; Pringle, C.M.
2006-01-01
Small dams for hydropower have caused widespread alteration of Central American rivers, yet much of recent development has gone undocumented by scientists and conservationists. We examined the ecological effects of a small hydropower plant (Dona Julia Hydroelectric Center) on two low-order streams (the Puerto Viejo River and Quebradon stream) draining a mountainous area of Costa Rica. Operation of the Dona Julia plant has dewatered these streams, reducing discharge to ~ 10% of average annual flow. This study compared fish assemblage composition and aquatic habitat upstream and downstream of diversion dams on two streams and along a ~ 4 km dewatered reach of the Puerto Viejo River in an attempt to evaluate current instream flow recommendations for regulated Costa Rican streams. Our results indicated that fish assemblages directly upstream and downstream of the dam on the third order Puerto Viejo River were dissimilar, suggesting that the small dam (< 15 in high) hindered movement of fishes. Along the ~ 4 km dewatered reach of the Puerto Viejo River, species count increased with downstream distance from the dam. However, estimated species richness and overall fish abundance were not significantly correlated with downstream distance from the dam. Our results suggested that effects of stream dewatering may be most pronounced for a subset of species with more complex reproductive requirements, classified as equilibrium-type species based on their life-history. In the absence of changes to current operations, we expect that fish assemblages in the Puerto Viejo River will be increasingly dominated by opportunistic-type, colonizing fish species. Operations of many other small hydropower plants in Costa Rica and other parts of Central America mirror those of Doha Julia; the methods and results of this study may be applicable to some of those projects.
Cattle preference for forage kochia, crested wheatgrass, and velvet lupine
USDA-ARS?s Scientific Manuscript database
Alkaloids in velvet lupine (Lupinus leucophyllis Dougl. ex Lindl) cause a crooked calf syndrome if the dam consumes the plant between day 40 to 100 of gestation. In spring calving operations, this coincides with late summer when annual grasses are mature and senescent in the Scabland Region of east...
Cultural Resources Investigation at the Lake Winnibigoshish Dam Site - 21 IC 4,
1978-01-01
56 Spring Lake, Minnesota, archaeology and ethnohistory 1959-76 Minnesota, North Dakota, annual archaeological research 1967 Paleolithic site survey...34Interesting Archaeological Reading." Minnesota Archaeologist, Vol. 32, No’s. 1 and 2, pp. 113-114. "Notes on a Paleolithic Site Survey in Pakistan
Hydrogen System Component Validation | Hydrogen and Fuel Cells | NREL
Meeting (June 2017) Hydrogen Component Validation: 2016 Annual Progress Report, Danny Terlip, Excerpt from the 2016 DOE Annual Progress Report (February 2017) Hydrogen Component Validation: 2016 Annual Merit Transportation Decisions, NREL Fact Sheet (June 2016) Hydrogen Component Validation: 2015 Annual Progress Report
Tiffan, Kenneth F.; Kock, Tobias J.; Connor, William P.; Mullins, Frank; Steinhorst, R. Kirk
2012-01-01
We conducted a 3-year radiotelemetry study in the lower Snake River to (1) determine whether juvenile fall Chinook salmon Oncorhynchus tshawytscha pass dams during winter, when bypass systems and structures designed to prevent mortality are not operated; (2) determine whether downstream movement rate varies annually, seasonally, and from reservoir to reservoir; and (3) identify some of the factors that contribute to annual, seasonal, and spatial variation in downstream movement rate. Fall Chinook salmon juveniles moved downstream up to 169 km and at a sufficiently fast rate (7.5 km/d) such that large percentages (up to 93%) of the fish passed one or more dams during the winter. Mean downstream movement rate varied annually (9.2–11.3 km/d), increased from winter (7.5 km/d) to spring (16.4 km/d), and increased (from 6.9 to 16.8 km/d) as fish moved downstream from reservoir to reservoir. Fish condition factor at tagging explained some of the annual variation in downstream movement rate, whereas water particle velocity and temperature explained portions of the seasonal variation. An increase in migrational disposition as fish moved downstream helped to explain the spatial variation. The potential cost of winter movement might be reduced survival due to turbine passage at a time when the bypass systems and spillway passage structures are not operated. Efforts to understand and increase passage survival of winter migrants in large impoundments might help to rehabilitate some imperiled anadromous salmonid populations.
Assessment of check-dam groundwater recharge with water-balance calculations
NASA Astrophysics Data System (ADS)
Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos
2017-04-01
Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without check-dam was estimated to be 1 million m3. Upper and lower limits of prediction intervals were computed to assess the uncertainties of the results. The model was rerun with these values and resulted in recharge values of 0.4 m3 as lower and 38 million m3 as upper limit. The sediment survey in the check-dam reservoir area showed that the reservoir area was filled with 2,000 to 3,000 tons of sediment after one rainfall season. This amount of sediment corresponds to 0.2 to 2 t h-1 y-1 sediment yield at the watershed level and reduces the check-dam storage capacity by approximately 10%. Results indicate that check-dams are valuable structures for increasing groundwater resources, but special attention should be given to soil erosion occurring in the upstream area and the resulting sediment built-up in the check-dam reservoir area. This study has received funding from the EU FP7 RECARE Project (GA 603498)
Geomorphic responses to large check-dam removal on a mountain river in Taiwan
NASA Astrophysics Data System (ADS)
Wang, H.; Stark, C. P.; Cook, K. L.; Kuo, W.
2011-12-01
Dam removal has become an important aspect of river restoration in recent years, but studies documenting the physical and ecological response to dam removal are still lacking - particularly in mountain rivers and following major floods. This presentation documents the recent removal of a large dam on a coarse-grained, steep (an order of magnitude greater than on the Marmot) mountain channel in Taiwan. The Chijiawan river, a tributary of the Tachia River draining a 1236 km2 watershed, is the only habitat in Taiwan of the endangered Formosan landlocked salmon. The habitat of this fish has been cut significantly since the 1960s following construction of check dams designed to prevent reservoir sedimentation downstream. The largest and lowermost barrier on Chijiawan creek is the 15m high, "No. 1 Check Dam" built in 1971. Forty years later, in early 2011, the sediment wedge behind the dam had reached an estimated 0.2 million m3 and the dam toe had been scoured about 4m below its foundation, posing a serious risk of dam failure. For these reasons, the Shei-Pa National Park removed the dam in late May 2011. To monitor the response of the river to dam removal, we installed video cameras, time-lapse cameras, stage recorders, and turbidity sensors, conducted surveys of grain size distributions and longitudinal profiles, and carried out repeat photography. Channel changes were greatest immediately following removal as a result of the high stream power, steep energy slope, and unconsolidated alluvial fill behind the dam. Headcut propagation caused immediate removal of the sand-grade sediment and progressive channel widening. One month after dam removal, a minor flood event excavated a big wedge of sediment from the impoundment. Most of the subsequent downstream deposition occurred within 500m of the dam, with alluviation reaching up to 0.5m in places. Two months after dam removal, erosion had propagated 300m upstream into the impounded sediment along a bed profile of gradient at 1.4% at a headcut with a local gradient of 5.1%. The change in grain size was a fining of the sediment at the two downstream sites and a slight coarsening at the upstream site from April 2010 to July 2011. This is likely due to the increase in energy upstream of the dam post-removal, which has transported the fine-grained sediments downstream. As the river adjusts over coming months and years, we anticipate that observations such as these will help generate an important resource for all those concerned with dam removal and river restoration.
Lambing, John H.; Sando, Steven K.
2009-01-01
This report presents estimated daily and cumulative loads of suspended sediment and selected trace elements transported during water year 2008 at three streamflow-gaging stations that bracket the Milltown Reservoir project area in the upper Clark Fork basin of western Montana. Milltown Reservoir is a National Priorities List Superfund site where sediments enriched in trace elements from historical mining and ore processing have been deposited since the construction of Milltown Dam in 1907. Milltown Dam was breached on March 28, 2008, as part of Superfund remedial activities to remove the dam and contaminated sediment that had accumulated in Milltown Reservoir. The estimated loads transported through the project area during the periods before and after the breaching of Milltown Dam, and for the entire water year 2008, were used to quantify the net gain or loss (mass balance) of suspended sediment and trace elements within the project area during the transition from a reservoir environment to a free-flowing river. This study was done in cooperation with the U.S. Environmental Protection Agency. Streamflow during water year 2008 compared to long-term streamflow, as represented by the record for Clark Fork above Missoula (water years 1930-2008), generally was below normal (long-term median) from about October 2007 through April 2008. Sustained runoff started in mid-April, which increased flows to near normal by mid-May. After mid-May, flows sharply increased to above normal, reaching a maximum daily mean streamflow of 16,800 cubic feet per second (ft3/s) on May 21, which essentially equaled the long-term 10th-exceedance percentile for that date. Flows substantially above normal were sustained through June, then decreased through the summer and reached near-normal by August. Annual mean streamflow during water year 2008 (3,040 ft3/s) was 105 percent of the long-term mean annual streamflow (2,900 ft3/s). The annual peak flow (17,500 ft3/s) occurred on May 21 and was 112 percent of the long-term mean annual peak flow (15,600 ft3/s). About 81 percent of the annual flow volume was discharged during the post-breach period. Daily loads of suspended sediment were estimated directly by using high-frequency sampling of the daily sediment monitoring. Daily loads of unfiltered-recoverable arsenic, cadmium, copper, iron, lead, manganese, and zinc were estimated by using regression equations relating trace-element discharge to either streamflow or suspended-sediment discharge. Regression equations for estimating trace-element discharge in water year 2008 were developed from instantaneous streamflow and concentration data for periodic water-quality samples collected during all or part of water years 2004-08. The equations were applied to records of daily mean streamflow or daily suspended-sediment loads to produce estimated daily trace-element loads. Variations in daily suspended-sediment and trace-element loads generally coincided with variations in streamflow. Relatively small to moderately large daily net losses from the project area were common during the pre-breach period when low-flow conditions were prevalent. Outflow loads from the project area sharply increased immediately after the breaching of Milltown Dam and during the rising limb and peak flow of the annual hydrograph. Net losses of suspended sediment and trace elements from the project area decreased as streamflow decreased during the summer, eventually becoming small or reaching an approximate net balance between inflow and outflow. Estimated daily loads of suspended sediment and trace elements for all three stations were summed to determine cumulative inflow and outflow loads for the pre-breach and post-breach periods, as well as for the entire water year 2008. Overall, the mass balance between the combined inflow loads from two upstream source areas (upper Clark Fork and Blackfoot River basins) and the outflow loads at Clark Fork above Missoula indicates net losses
Design flow duration curves for environmental flows estimation in Damodar River Basin, India
NASA Astrophysics Data System (ADS)
Verma, Ravindra Kumar; Murthy, Shankar; Verma, Sangeeta; Mishra, Surendra Kumar
2017-06-01
In this study, environmental flows (EFs) are estimated for six watersheds of Damodar River Basin (DRB) using flow duration curve (FDC) derived using two approaches: (a) period of record and (b) stochastic approaches for daily, 7-, 30-, 60-day moving averages, and 7-daily mean annual flows observed at Tenughat dam, Konar dam, Maithon dam, Panchet dam, Damodar bridge, Burnpur during 1981-2010 and at Phusro during 1988-2010. For stochastic FDCs, 7-day FDCs for 10, 20-, 50- and 100-year return periods were derived for extraction of discharge values at every 5% probability of exceedance. FDCs derived using the first approach show high probability of exceedance (5-75%) for the same discharge values. Furthermore, discharge values of 60-day mean are higher than those derived using daily, 7-, and 30-day mean values. The discharge values of 95% probability of exceedance (Q95) derived from 7Q10 (ranges from 2.04 to 5.56 cumec) and 7Q100 (ranges from 3.4 to 31.48 cumec) FDCs using the second approach are found more appropriate as EFs during drought/low flow and normal precipitation years.
Lower Granite Dam Smolt Monitoring Program, 2000 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morrill, Charles; Ross, Doug; Mensik, Fred
2000-01-01
The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. Themore » increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection).« less
Lower Granite Dam Smolt Monitoring Program, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mensik, Fred; Rapp, Shawn; Ross, Doug
2004-08-01
The 2003 fish collection season at Lower Granite Dam Juvenile Fish Facility (LGR) was characterized by water temperatures, total flows and spill that were below the five year average, low levels of debris, and increased smolt collection numbers compared to 2002 with the exception of unclipped sockeye/kokanee. There were 6,183,825 juvenile salmonids collected. Of these, 6,054,167 were transported to release sites below Bonneville Dam, 5,957,885 by barge and 96,282 by truck. An additional 102,340 fish were bypassed back to the river, primarily due to research projects with another 62,122 bypassed through the PIT-tag bypass system. According to the PTAGIS database,more » 152,268 PIT-tagged fish were detected at Lower Granite Dam. Of these, Smolt Monitoring Staff recorded 345 PIT-tagged raceway and sample mortalities. Of the 6,183,825 total fish collected, 113,290 were PIT-tagged or radio tagged and 380 were sacrificed by researchers. The collection included 836,885 fish that had hatchery marks other than clipped fins (elastomer, freeze brands or Coded Wire Tags). An estimated 54,857 incidental fish were collected with an additional 8,730 adult salmonids removed from the separator.« less
Dams and Rivers: A Primer on the Downstream Effects of Dams
Collier, Michael; Webb, Robert H.; Schmidt, John C.
1996-01-01
The U.S. Geological Survey is charged with monitoring the water and mineral resources of the United States. Beginning in 1889, the Survey established a network of water gaging stations across most of the country's rivers; some also measured sediment content of the water. Consequently, we now have valuable long-term data with which to track water supply, sediment transport, and the occurrence of floods. Many variables affect the flow of water from mountain brook to river delta. Some are short-term perturbations like summer thunderstorms. Others occur over a longer period of time, like the El Ninos that might be separated by a decade or more. We think of these variables as natural occurrences, but humans have exerted some of the most important changes -- water withdrawals for agriculture, inter-basin transfers, and especially the construction of an extensive system of dams. Dams have altered the flow of many of the Nation's rivers to meet societal needs. We expect floods to be contained. Irrigation is possible where deserts once existed. And water is released downstream not according to natural cycles but as dictated by a region's hour-by-hour needs for water or electricity. As a result, river channels below dams have changed dramatically. Depending on annual flow, flood peaks, and a river's sediment load, we might see changes such as sand building up in one channel, vegetation crowding into another, and extensive bank erosion in another. This Circular explores the emerging scientific arena of change in rivers below dams. This science tries first to understand and then anticipate changes to river beds and banks, and to riparian habitats and animal communities. To some degree, these downstream changes can be influenced by specific strategies of dam management. Scientists and resource managers have a duty to assemble this information and present it without bias to the rest of society. Society can then more intelligently choose a balance between the benefits and adverse downstream effects of dams.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronson, James P.; Duke, Bill; Loffink, Ken
2008-12-30
In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival ofmore » migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.« less
Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot
Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi
2016-01-01
Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world’s largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10–20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased—particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for fishes than the consequences of global warming. Limits upon dam construction should therefore be a priority action for conserving fish biodiversity in the Indo-Burma hotspot. This would minimize synergistic impacts attributable to dams plus global warming, and help ensure the continued provision of ecosystem services represented by the Lower Mekong fishery. PMID:27532150
Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.
Kano, Yuichi; Dudgeon, David; Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shibukawa, Koichi; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi; Utsugi, Kenzo
2016-01-01
Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for fishes than the consequences of global warming. Limits upon dam construction should therefore be a priority action for conserving fish biodiversity in the Indo-Burma hotspot. This would minimize synergistic impacts attributable to dams plus global warming, and help ensure the continued provision of ecosystem services represented by the Lower Mekong fishery.
Giesy, J.P.; Verbrugge, D.A.; Othoudt, R. A.; Bowerman, W.W.; Mora, M.A.; Jones, P.D.; Newsted, J.L.; Vandervoort, C.; Heaton, S. N.; Aulerich, R.J.; Bursian, S.J.; Ludwig, J. P.; Dawson, G. A.; Kubiak, T.J.; Best, D. A.; Tillitt, D. E.
1994-01-01
Populations of mink (Mustela vison) have declined in many areas of the world. Such declines have been linked to exposures to synthetic, halogenated hydrocarbons. In the Great Lakes region, mink are fewer in areas along the shore of the Great Lakes and their tributaries where mink have access to fish from the Great Lakes. Recently, there has been discussion of the relative merits of passage of fishes around hydroelectric dams on rivers in Michigan. A hazard assessment was conducted to determine the potential for adverse effects on mink, which could consume such fishes from above or below dams on the rivers. Concentrations of organochlorine insecticides, polychlorinated biphenyls (PCBs), 2,3,7,8-tetrachloridibenzo-p-dioxin equivalents (TCDD-EQ), and total mercury were measured in composite samples of fishes from above or below hydroelectric dams on the Manistee and Muskegon Rivers, which flow into Lake Michigan, and the Au Sable River, which flows into Lake Huron. Concentrations of organochlorine insecticides, PCBs, and TCDD-EQ were all greater in fishes from below the dams than those from above. Concentrations of neither organochlorine insecticides nor mercury in fishes are currently a risk to mink above or below the dams. All of the species of fishes collected from downstream of the dams contained concentrations of PCBs and TCDD-EQ, which represent a hazard to mink. The hazard index for PCBs was less than one for the average of all species from the upstream reaches of the Manistee and Au Sable Rivers, but not the Muskegon. The hazard index (concentration in fish/NOAEC) was greater than 1 for all of the species collected from below the dams, in all three rivers. The greatest hazard index was observed for carp (Cyprinus carpio) downstream on the Muskegon River. Because the concentrations of PCBs used in the hazard assessment were corrected for relative toxic potencies, the hazard ratios based on PCBs should be similar to those based on TCDD-EQ. This was found to be true. Thus, either total PCBs or TCDD-EQ could be used as the critical toxicant in the hazard assessment. However, if uncorrected concentrations of PCBs, expressed as Aroclors®, were used in the hazard assessment, the toxicity of the weathered mixture would have been underestimated by approximately five-fold, and, in that instance, TCDD-EQ would be the critical contaminant for the hazard assessment. The average maximum allowable percentage of fish from above the dams, which would result in no observable adverse effects of TCDD-EQ, was 70%. Based on the average TCDD-EQ concentrations in the fishes, an average of 8.6% of the diet could be made up of fishes from below dams on the rivers. The most restrictive daily allowable intakes were for carp on the Muskegon and steelhead trout (Onchorhyncus mykiss) on the Manistee Rivers. Only 2.7% of the diet could be made up of these two species from influenced portion of the Au Sable River, they would be exposed to 390 μg PCBs and 8.55 ng of TCDD-EQ per day, respectively (Giesy et al. 1994b). Thus, it would take 15.1 or 77 days for mink to receive their total annual dose of PCBs or TCDD-EQ, respectively. At least for chinook salmon, the critical contaminant for the purposes of hazard assessment would be total concentrations of PCBs. Consuming chinook salmon for as little as 2 weeks would deliver the annual allowable dose of PCBs to mink.
NASA Astrophysics Data System (ADS)
Vu, Tinh Thi; Kiesel, Jens; Guse, Bjoern; Fohrer, Nicola
2017-04-01
The damming of rivers causes one of the most considerable impacts of our society on the riverine environment. More than 50% of the world's streams and rivers are currently impounded by dams before reaching the oceans. The construction of dams is of high importance in developing and emerging countries, i.e. for power generation and water storage. In the Vietnamese Vu Gia - Thu Bon Catchment (10,350 km2), about 23 dams were built during the last decades and store approximately 2,156 billion m3 of water. The water impoundment in 10 dams in upstream regions amounts to 17 % of the annual discharge volume. It is expected that impacts from these dams have altered the natural flow regime. However, up to now it is unclear how the flow regime was altered. For this, it needs to be investigated at what point in time these changes became significant and detectable. Many approaches exist to detect changes in stationary or consistency of hydrological records using statistical analysis of time series for the pre- and post-dam period. The objective of this study is to reliably detect and assess hydrologic shifts occurring in the discharge regime of an anthropogenically influenced river basin, mainly affected by the construction of dams. To achieve this, we applied nine available change-point tests to detect change in mean, variance and median on the daily and annual discharge records at two main gauges of the basin. The tests yield conflicting results: The majority of tests found abrupt changes that coincide with the damming-period, while others did not. To interpret how significant the changes in discharge regime are, and to which different properties of the time series each test responded, we calculated Indicators of Hydrologic Alteration (IHAs) for the time period before and after the detected change points. From the results, we can deduce, that the change point tests are influenced in different levels by different indicator groups (magnitude, duration, frequency, etc) and that within the indicator groups, some indicators are more sensitive than others. For instance, extreme low-flow, especially 7- and, 30-day minima and mean minimum low flow, as well as the variability of monthly flow are highly-sensitive to most detected change points. Our study clearly shows that, the detected change points depend on which test is chosen. For an objective assessment of change points, it is therefore necessary to explain the change points by calculating differences in IHAs. This analysis can be used to assess which change point method reacts to which type of hydrological change and, more importantly, it can be used to rank the change points according to their overall impact on the discharge regime. This leads to an improved evaluation of hydrologic change-points caused by anthropogenic impacts. Our study clearly shows that, the detected change points depend on which test is chosen. For an objective assessment of change points, it is therefore necessary to explain the change points by calculating differences in IHAs. This analysis can be used to assess which change point method reacts to which type of hydrological change and, more importantly, it can be used to rank the change points according to their overall impact on the discharge regime. This leads to an improved evaluation of hydrologic change-points caused by anthropogenic impacts.
Fitzpatrick, Faith A.
2005-01-01
Historical trends in streamflow, sedimentation, and sediment chemistry of the Wolf River were examined for a 6-mile reach that flows through the southern part of the Menominee Indian Reservation and the northern part of Shawano County, Wis. Trends were examined in the context of effects from dams, climate, and land-cover change. Annual flood peaks and mean monthly flow for the Wolf River were examined for 1907-96 and compared to mean annual and mean monthly precipitation. Analysis of trends in sedimentation (from before about 1850 through 1999) involved collection of cores and elevation data along nine valley transects spanning the Wolf River channel, flood plain, and backwater and impounded areas; radioisotope analyses of impounded sediment cores; and analysis of General Land Office Survey Notes (1853-91). Trends in sediment chemistry were examined by analyzing samples from an impoundment core for minor and trace elements. Annual flood peaks for the Wolf River decreased during 1907-49 but increased during 1950-96, most likely reflecting general changes in upper-atmospheric circulation patterns from more zonal before 1950 to more meridional after 1950. The decrease in flood peaks during 1907-49 may also, in part, be due to forest regrowth. Mean monthly streamflow during 1912-96 increased for the months of February and March but decreased for June and July, suggesting that spring snowmelt occurs earlier in the season than it did in the past. Decreases in early summer flows may be a reflection earlier spring snowmelt and large rainstorms in early spring rather than early summer. These trends also may reflect upper-atmospheric circulation patterns. The Balsam Row Dam impoundment contains up to 10 feet of organic-rich silty clay and has lost much of its storage capacity. Fine sediment has accumulated for 1.8 miles upstream from the Balsam Row Dam. Historical average linear and mass sedimentation rates in the Balsam Row impoundment were 0.09 feet per year and 1.15 pounds per square foot per year for 1927-62 and 0.10 feet per year and 1.04 pounds per square foot per year for 1963-99. Sedimentation in the impoundment was episodic and was associated with large floods, especially the flood-related failure of the Keshena Falls Dam in 1972 and a large flood in 1973. Sand deposition is common in the Wolf River upstream from the impounded reach for 2.5 miles and is caused by the base-level increase associated with the Balsam Row Dam. Some sand deposition also may have been associated with logging and log drives in the late 1800s and the failure of the Keshena Falls Dam. In the upstream 1.5-mile part of the studied reach, the substrate is mainly rocky; however, about 2,000 feet downstream from Keshena Falls, the channel has narrowed and incised since the 1890s, likely related to human alterations associated with logging, log drives, and (or) changes in hydraulics and sediment characteristics associated with completion of the Keshena Falls Dam and head race in 1908. Minor- and trace-element concentrations in sediment from Balsam Row impoundment and other depositional areas along the Wolf River generally reflect background conditions as affected by watershed geology and historical inputs from regional and local atmospheric deposition.
A Jupiter Data Analysis Program (JDAP) research grant on wave accessibility and attributes
NASA Technical Reports Server (NTRS)
Calvert, Wynne
1987-01-01
For more than thirty years the intense decametric radio emissions from Jupiter (DAM) and the corresponding auroral kilometric radiation from the Earth (AKR) have remained major radio science mysteries. Part of the problem, aside from their inherent complexity, has been the difficulty of measuring their source location and emission properties from limited observations. Progress has been made on this problem by locating the source directly, i.e., by analysis of the faraday rotation observed with Voyager as the wave path crossed the Io plasma torus, and indirectly by comparing the peak frequencies of the decametric emission with that at the foot of the Io flux tube. Progress was also made on the general question of how the emissions originate by finding properties of both the AKR and DAM which would imply emission by natural radio lasing.
Dam Failure Inundation Map Project
NASA Technical Reports Server (NTRS)
Johnson, Carl; Iokepa, Judy; Dahlman, Jill; Michaud, Jene; Paylor, Earnest (Technical Monitor)
2000-01-01
At the end of the first year, we remain on schedule. Property owners were identified and contacted for land access purposes. A prototype software package has been completed and was demonstrated to the Division of Land and Natural Resources (DLNR), National Weather Service (NWS) and Pacific Disaster Center (PDC). A field crew gathered data and surveyed the areas surrounding two dams in Waimea. (A field report is included in the annual report.) Data sensitivity analysis was initiated and completed. A user's manual has been completed. Beta testing of the software was initiated, but not completed. The initial TNK and property owner data collection for the additional test sites on Oahu and Kauai have been initiated.
Effects of human activities and climate variability on water resources in the Saveh plain, Iran.
Mohammadi Ghaleni, M; Ebrahimi, K
2015-02-01
Quantity and quality distribution of surface water and groundwater are changing under the impacts of both climate variability and human activities. The main goal of this paper is to evaluate the abovementioned impacts on the water resources in the Saveh plain, central Iran. To achieve this aim, spatial and temporal changes of the surface and groundwater quality and quantity have been analyzed, using hydrometric and meteorological data. The nonparametric Mann-Kendall test was used to identify trends and change points in the annual rainfall and runoff for the period of 1946 to 2011. In order to analyze the impacts of the Saveh Dam on runoff, the dam operation year, 1994, was considered as a change point. Mann-Kendall test results show that rainfall time series was divided into two parts, namely, 1966-1989 and 1990-2007, and averages of annual rainfall in five stations increase from 10 to 21 %. Also, runoff time series was divided into two parts, namely, 1946-1995 and 1996-2007 and averages of annual runoff in four stations decrease from 8 to 83 %. Results show that rainfall changes in Shahabasi, Razin, Jalayer, Emamabad, and Ahmadabad stations increased from 9 to 33 % before and after 1994. Nevertheless, runoff decreased from 24 to 81 %. The results indicate that the greatest lack of runoff between stations is at Shahabasi station and one important reason for the severe lack is operation of the Saveh Dam in 1994. Highest groundwater level decline, about 168.67 cm, occurred in 1994 that is the operation year of the Saveh Dam. Trend analysis of surface water quality show that electrical conductivity increased 957.34 μmho/cm before and after 1994. Also, the Wilcox water quality classification method has been reduced from C3-S1 to C4-S2. Average groundwater electrical conductivity (EC) during 1999-2003 and 2004-2009 increased to 89.6 μmho/cm. Also, the groundwater quality indices for agricultural usages are classified in four classes including, C4-S2 16, C4-S1 46, C3-S1 30, and C2-S1 8 % of the total aquifer area. In conclusion, in order to have a sustainable development, the effects of water projects on environment and water resources need to be predicted very carefully.
2005-04-01
5084. 6. Colpaert CG, Vermeulen PB, Benoy I, Soubry A, van Roy F, van Beest P, Goovaerts G, Dirix LY, van Dam P, Fox SB, Harris AL, van MarckEA...cancer. Cancer Res 1999, 59: 5079-5084. 17 14. Colpaert CG, Vermeulen PB, Benoy I, Soubry A, van Roy F, van Beest P, Goovaerts G, Dirix LY, van Dam P...Ohira S, Feng Y, Nikaido T, Konishi I: Up- regulation of small GTPases, RhoA and RhoC, is associated with tumor progression in ovarian carcinoma. Lab
Heimann, David C.; Rasmussen, Patrick P.; Cline, Teri L.; Pigue, Lori M.; Wagner, Holly R.
2010-01-01
Suspended-sediment data from 18 selected surface-water monitoring stations in the lower Missouri River Basin downstream from Gavins Point Dam were used in the computation of annual suspended-sediment and suspended-sand loads for 1976 through 2008. Three methods of suspended-sediment load determination were utilized and these included the subdivision method, regression of instantaneous turbidity with suspended-sediment concentrations at selected stations, and regression techniques using the Load Estimator (LOADEST) software. Characteristics of the suspended-sediment and streamflow data collected at the 18 monitoring stations and the tabulated annual suspended-sediment and suspended-sand loads and yields are presented.
18 CFR 11.2 - Use of government lands.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Use of government lands... ACT Charges for Costs of Administration, Use of Tribal Lands and Other Government Lands, and Use of Government Dams § 11.2 Use of government lands. (a) Reasonable annual charges for recompensing the United...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Effective date. 11.7... Dams § 11.7 Effective date. All annual charges imposed under this subpart will be computed beginning on the effective date of the license unless some other date is fixed in the license. [51 FR 24318, July 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Two events over the 4th of July Weekend. One will be on the 4th and the other will be on a weekend evening closest to the 4th of July. Date First week in July. Location Laughlin, NV./Bullhead City, AZ...
Carvalho, A R
2007-11-01
The Upper Paraná River floodplain is the last lotic stretch of an ecosystem seriously threatened given that circa 50% of the original ecosystem has been converted into reservoirs. To assess the recreational value of the Upper Paraná River floodplain, 174 tourists were interviewed using the Willingness to Pay--WTP and Travel Cost--TC methods. The annual aggregated WTP attributed by tourists was US$ 122.50 million and the variables which determine the decision in willingness to pay for the Floodplain are: 'consider oneself as a Floodplain natural resources consumer' and 'marital state'. If the single person considers her/himself as a consumer of floodplain natural resources, the WTP increases by a multiplicative factor of 38.8. The value aggregated by the TC method was US$ 234 millions and decreased by zone as the distance increases. Higher income and traveling farther increases the travel cost, which is inversely related to annual trip frequency. The total recreational value (356.5 millions per year) is high and representative since it refers to an environment fragmented by dams and with many anthropogenic effects. Therefore, the progressive changes on the landscape are a threat to local tourism, since half of the visitors are attracted solely by the scenic beauty, thereby overtaking those factors considered more important by public decision makers and managers, such as recreational fishery or boating.
Welsh, Stuart A.; Aldinger, Joni L.; Braham, Melissa A.; Zimmerman, Jennifer L.
2016-01-01
Monitoring of dam passage can be useful for management and conservation assessments of American eel, particularly if passage counts can be examined over multiple years. During a 7-year study (2007–2013) of upstream migration of American eels within the lower Shenandoah River (Potomac River drainage), we counted and measured American eels at the Millville Dam eel pass, where annual study periods were determined by the timing of the eel pass installation during spring or summer and removal during fall. Daily American eel counts were analysed with negative binomial regression models, with and without a year (YR) effect, and with the following time-varying environmental covariates: river discharge of the Shenandoah River at Millville (RDM) and of the Potomac River at Point of Rocks, lunar illumination (LI), water temperature, and cloud cover. A total of 17 161 yellow-phase American eels used the pass during the seven annual periods, and length measurements were obtained from 9213 individuals (mean = 294 mm TL, s.e. = 0.49, range 183–594 mm). Data on passage counts of American eels supported an additive-effects model (YR + LI + RDM) where parameter estimates were positive for river discharge (β = 7.3, s.e. = 0.01) and negative for LI (β = −1.9, s.e. = 0.34). Interestingly, RDM and LI acted synergistically and singularly as correlates of upstream migration of American eels, but the highest daily counts and multiple-day passage events were associated with increased RDM. Annual installation of the eel pass during late spring or summer prevented an early spring assessment, a period with higher RDM relative to those values obtained during sampling periods. Because increases in river discharge are climatically controlled events, upstream migration events of American eels within the Potomac River drainage are likely linked to the influence of climate variability on flow regime.
NASA Astrophysics Data System (ADS)
Tessari, G.; Riccardi, P.; Pasquali, P.
2017-12-01
Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation fields obtained from SAR data are evaluated to assess the temporal evolution of the strains affecting the structure. Obtained results represent the preliminary stage of a multidisciplinary project, finalized to assess possible damages affecting a dam through remote sensing and civil engineering surveys.
Suspended sediment transport in the freshwater reach of the Hudson river estuary in eastern New York
Wall, G.R.; Nystrom, E.A.; Litten, S.
2008-01-01
Deposition of Hudson River sediment into New York Harbor interferes with navigation lanes and requires continuous dredging. Sediment dynamics at the Hudson estuary turbidity maximum (ETM) have received considerable study, but delivery of sediment to the ETM through the freshwater reach of the estuary has received relatively little attention and few direct measurements. An acoustic Doppler current profiler was positioned at the approximate limit of continuous freshwater to develop a 4-year time series of water velocity, discharge, suspended sediment concentration, and suspended sediment discharge. This data set was compared with suspended sediment discharge data collected during the same period at two sites just above the Hudson head-of-tide (the Federal Dam at Troy) that together represent the single largest source of sediment entering the estuary. The mean annual suspended sediment-discharge from the freshwater reach of the estuary was 737,000 metric tons. Unexpectedly, the total suspended sediment discharge at the study site in November and December slightly exceeded that observed during March and April, the months during which rain and snowmelt typically result in the largest sediment discharge to the estuary. Suspended sediment discharge at the study site exceeded that from the Federal Dam, even though the intervening reach appears to store significant amounts of sediment, suggesting that 30-40% of sediment discharge observed at the study site is derived from tributaries to the estuary between the Federal Dam and study site. A simple model of sediment entering and passing through the freshwater reach on a timescale of weeks appears reasonable during normal hydrologic conditions in adjoining watersheds; however, this simple model may dramatically overestimate sediment delivery during extreme tributary high flows, especially those at the end of, or after, the "flushing season" (October through April). Previous estimates of annual or seasonal sediment delivery from tributaries and the Federal Dam to the ETM and harbor may be high for those years with extreme tributary high-flow events. ?? 2008 Coastal and Estuarine Research Federation.
Malaria and large dams in sub-Saharan Africa: future impacts in a changing climate.
Kibret, Solomon; Lautze, Jonathan; McCartney, Matthew; Nhamo, Luxon; Wilson, G Glenn
2016-09-05
Sub-Saharan Africa (SSA) has embarked on a new era of dam building to improve food security and promote economic development. Nonetheless, the future impacts of dams on malaria transmission are poorly understood and seldom investigated in the context of climate and demographic change. The distribution of malaria in the vicinity of 1268 existing dams in SSA was mapped under the Intergovernmental Panel on Climate Change (IPCC) representative concentration pathways (RCP) 2.6 and 8.5. Population projections and malaria incidence estimates were used to compute population at risk of malaria in both RCPs. Assuming no change in socio-economic interventions that may mitigate impacts, the change in malaria stability and malaria burden in the vicinity of the dams was calculated for the two RCPs through to the 2080s. Results were compared against the 2010 baseline. The annual number of malaria cases associated with dams and climate change was determined for each of the RCPs. The number of dams located in malarious areas is projected to increase in both RCPs. Population growth will add to the risk of transmission. The population at risk of malaria around existing dams and associated reservoirs, is estimated to increase from 15 million in 2010 to 21-23 million in the 2020s, 25-26 million in the 2050s and 28-29 million in the 2080s, depending on RCP. The number of malaria cases associated with dams in malarious areas is expected to increase from 1.1 million in 2010 to 1.2-1.6 million in the 2020s, 2.1-3.0 million in the 2050s and 2.4-3.0 million in the 2080s depending on RCP. The number of cases will always be higher in RCP 8.5 than RCP 2.6. In the absence of changes in other factors that affect transmission (e.g., socio-economic), the impact of dams on malaria in SSA will be significantly exacerbated by climate change and increases in population. Areas without malaria transmission at present, which will transition to regions of unstable transmission, may be worst affected. Modifying conventional water management frameworks to improve malaria control, holds the potential to mitigate some of this increase and should be more actively implemented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
... Information Collection: Comment Request; Annual Progress Reports for Empowerment Zones AGENCY: Office of... lists the following information: Title of proposal: Annual Progress Reports for Empowerment Zones. OMB... information collection for reporting requirements of 30 Urban Empowerment Zones (EZs). HUD will regularly...
Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.
2010-01-01
Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because little information is available about their survival as they pass hydroelectric dams in the lower Columbia River. Collecting information on fish released in the Mid-Columbia River, as well as on fish released 8 kilometers upstream of McNary Dam, allowed us to evaluate similarities and differences in passage and survival probabilities. In general, juvenile salmonids released in the Mid-Columbia River and detected at and downstream of McNary Dam showed trends in passage and survival probabilities that were similar to fish released 8 kilometers upstream of McNary Dam. This suggests that increased migration time or length of migration had little effect on behavior and survival of Mid-Columbia River released juvenile salmonids detected at McNary Dam.
Collaborative, Data-Intensive Science Key to Science & Commerce Challenges
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kleese van Dam, Kerstin
2013-05-28
This article coincides with the release of "Data-Intensive Science," co-edited by Dr. Kerstin Kleese van Dam. In the piece, Dr. Kleese van Dam explains how data-intensive science has the potential to transform not only how we do science but how quickly we can translate scientific progress into complete solutions, policies, decisions and, ultimately, economic success. In the article, she states it is clear that nations that can most effectively transform tons of scientific data into actionable knowledge are going to be the leaders in the future of science and commerce and how creating the required new insights for complex challengesmore » cannot be done without effective collaboration. Because many science domains already are unable to explore all of the data they collect (or which is relevant to their research), progress in collaborative, data-intensive science is crucial toward unlocking the potential of big data.« less
Anthropogenic Water Uses and River Flow Regime Alterations by Dams
NASA Astrophysics Data System (ADS)
Ferrazzi, M.; Botter, G.
2017-12-01
Dams and impoundments have been designed to reconcile the systematic conflict between patterns of anthropogenic water uses and the temporal variability of river flows. Over the past seven decades, population growth and economic development led to a marked increase in the number of these water infrastructures, so that unregulated free-flowing rivers are now rare in developed countries and alterations of the hydrologic cycle at global scale have to be properly considered and characterized. Therefore, improving our understanding of the influence of dams and reservoirs on hydrologic regimes is going to play a key role in water planning and management. In this study, a physically based analytic approach is combined to extensive hydrologic data to investigate natural flow regime alterations downstream of dams in the Central-Eastern United States. These representative case studies span a wide range of different uses, including flood control, water supply and hydropower production. Our analysis reveals that the most evident effects of flood control through dams is a decrease in the intra-seasonal variability of flows, whose extent is controlled by the ratio between the storage capacity for flood control and the average incoming streamflow. Conversely, reservoirs used for water supply lead to an increase of daily streamflow variability and an enhanced inter-catchment heterogeneity. Over the last decades, the supply of fresh water required to sustain human populations has become a major concern at global scale. Accordingly, the number of reservoirs devoted to water supply increased by 50% in the US. This pattern foreshadows a possible shift in the cumulative effect of dams on river flow regimes in terms of inter-catchment homogenization and intra-annual flow variability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.
2003-03-01
This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited atmore » a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.« less
21 CFR 601.70 - Annual progress reports of postmarketing studies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 7 2011-04-01 2010-04-01 true Annual progress reports of postmarketing studies... SERVICES (CONTINUED) BIOLOGICS LICENSING Postmarketing Studies § 601.70 Annual progress reports of postmarketing studies. (a) General requirements. This section applies to all required postmarketing studies (e.g...
21 CFR 601.70 - Annual progress reports of postmarketing studies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Annual progress reports of postmarketing studies... SERVICES (CONTINUED) BIOLOGICS LICENSING Postmarketing Studies § 601.70 Annual progress reports of postmarketing studies. (a) General requirements. This section applies to all required postmarketing studies (e.g...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... information. \\5\\ Estimated number of hours an employee works each year = 2080, estimated average annual cost..., along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction... water or water power from any Government dam. FERC-515: The information collected under the requirements...
Tong, Jia; Miaowen, Cao; Juhui, Jing; Jinxian, Liu; Baofeng, Chai
2017-01-01
We conducted a survey of native grass species infected by endophytic fungi in a copper tailings dam over progressive years of phytoremediation. We investigated how endophytic fungi, soil microbial community structure and soil physiochemical properties and enzymatic activity varied in responses to heavy metal pollution over different stages of phytoremediation. endophyte infection frequency increased with years of phytoremediation. Rates of endophyte infection varied among different natural grass species in each sub-dam. Soil carbon content and soil enzymatic activity gradually increased through the years of phytoremediation. endophyte infection rates of Bothriochloa ischaemum and Festuca rubra were positively related to levels of cadmium (Cd) pollution levels, and fungal endophytes associated with Imperata cylindrical and Elymus dahuricus developed tolerance to lead (Pb). The structure and relative abundance of bacterial communities varied little over years of phytoremediation, but there was a pronounced variation in soil fungi types. Leotiomycetes were the dominant class of resident fungi during the initial phytoremediation period, but Pezizomycetes gradually became dominant as the phytoremediation period progressed. Fungal endophytes in native grasses as well as soil fungi and soil bacteria play different ecological roles during phytoremediation processes. Copyright © 2016 Elsevier B.V. All rights reserved.
Spokane Tribal Hatchery, 2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peone, Tim L.
2003-03-01
The Spokane Tribal Hatchery (Galbraith Springs) project originated from the Northwest Power Planning Council (NPPC) 1987 Columbia Basin Fish and Wildlife Program. The goal of this project is to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake fisheries adversely affected by the construction and operation of Grand Coulee Dam. The objective is to produce kokanee salmon and rainbow trout for release into Lake Roosevelt for maintaining a viable fishery. The goal and objective of this project adheres to the NPPC Resident Fish Substitution Policy and specifically to the biological objectives addressed in the NPPC Columbiamore » River Basin Fish and Wildlife Program to mitigate for hydropower related fish losses in the blocked area above Chief Joseph/Grand Coulee Dams.« less
NASA Astrophysics Data System (ADS)
Al-Zaidi, B. M.; Moussa, A.; Viparelli, E.
2017-12-01
The construction of the High and Old Aswan Dams and of barrages significantly altered the flow and the sediment transport regimes in the Egyptian reach of the Nile River. The field data collected by the Nile Research Institute show that the post-High Aswan Dam Nile River hydrology is characterized by reductions of more than 70% in flow discharge and 98% in sediment load compared to pre-High Aswan Dam conditions. A significant portion of discharge released from the dams is diverted at the barrages for agricultural ( 80%) and municipal ( 15%) uses. Thus, virtually no water is reaching the Nile Delta and the Mediterranean Sea. Consequently, the sediment load delivered to the Mediterranean Sea is negligible compared to pre-dam conditions. Consequences of the flow regulation are delta wide wetland loss and shoreline retreat, widespread delta pollution, reduction soil quality, salination of cultivated land, wetland losses, and saltwater intrusion in the groundwater. Here we present the second part of a feasibility study for the restoration of the Nile River-Delta system characterized by controlled flow releases and sediment augmentations downstream of the High Aswan Dam. The controlled flow releases are obtained by regulating the current releases from the High Aswan Dam at the Old Aswan Dam, which is located 6.5 km downstream of the High Aswan Dam. Previous studies showed that 10 billion m3 of water can be saved annually by improving the Egyptian irrigation system. Here we propose to use the saved water to increase the water discharge to the Nile Delta, i.e., the total volume of water released from the dams does not change, what changes is the water used and the imposed hydrograph. We modulate the river flow by storing the saved water during the agriculture season upstream of the Old Aswan Dam and releasing it in the months coinciding with the natural river flood season. It is important to note that here we are considering the simplest possible scenario for water storage. In reality, additional storage volumes are available upstream of the major barrages, and these volumes can also be used during the proposed restoration project. The study consists in the implementation and validation of a laterally averaged delta growth model to quantify the impact of the proposed restoration project on the Nile Delta in terms of changes in shoreline position and channel-floodplain characteristics under the predicted rates of sea level rise.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlingsmore » at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at McNary Dam and June 5 at Bonneville Dam. Median arrival dates, based on all detections, of PIT tagged yearlings released from Captain John Rapids were April 26 at Lower Granite Dam, May 8 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 8 at Lower Granite Dam, May 23 at McNary Dam and May 26 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged fish released from Lyons Ferry Hatchery were 16.9 days to Lower Monumental Dam, 20.9 days to McNary Dam and 30.3 days to Bonneville Dam. Median migration rates were 1.7 rkm/d to Lower Monumental Dam, 7.0 rkm/d to McNary Dam and 12.6 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Monumental Dam, May 1 at McNary Dam and May 8 at Bonneville Dam. The 90% passage dates were May 13 at Lower Monumental Dam, May 16 at McNary Dam and May 24 at Bonneville Dam.« less
45 CFR 1357.16 - Annual progress and services reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... wishes to include. (b) Submittal of the annual progress and services report and CFS-101. (1) The State and the Indian Tribe must send the Annual Progress and Services Report and the CFS-101 to the... allocations a CFS-101 must be submitted for each fiscal year. (3) States and Indian Tribes which have...
45 CFR 1357.16 - Annual progress and services reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... wishes to include. (b) Submittal of the annual progress and services report and CFS-101. (1) The State and the Indian Tribe must send the Annual Progress and Services Report and the CFS-101 to the... allocations a CFS-101 must be submitted for each fiscal year. (3) States and Indian Tribes which have...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... of a Currently Approved Collection; Semi-Annual Progress Report for the Sexual Assault Services...-Annual Progress Report for Grantees from the Semi-Annual Progress Report for the Sexual Assault Services... assistance for adult, youth, and child victims of sexual assault, family and household members of victims...
Hydrologic scenarios for floodplain building in a vertically accreting, suspended sediment river
NASA Astrophysics Data System (ADS)
Alexander, J. S.; Scott, M. L.; Schmidt, J. C.
2006-12-01
Recent advances in dendrogeomorphology allow for precise age constraint on rates of floodplain building. We applied these techniques in our effort to evaluate the relative roles of flow regulation and invasive riparian vegetation in accelerating the rate of vertical accretion and channel narrowing of the dam-regulated upper Green River in Dinosaur National Monument, Colorado and Utah. Four large trenches were excavated into alluvial deposits that are now inundated by either common post-dam floods or rare post-dam high releases. We dated individual stratigraphic units using the recently developed stem-burial method (Friedman et al. 2005), as well as traditional cross-dating methods. These excavations indicate that episodic large floods with pre- dam recurrences of 5 to 10 years may vertically aggrade floodplains by up to 1.0 m. Smaller, more frequent, floods progressively create inset alluvial deposits that are subsequently colonized by native or non-native woody shrubs and trees. These lower elevation deposits serve as growing surfaces for both native and non- native riparian plants as well as stable platforms for deposition during occasional large post-dam floods that exceed the capacity of the dam's power plant. This style of floodplain building results in channel narrowing and loss of aquatic habitats. In the case of the upper Green River, the majority of channel narrowing occurred during two isolated events: (1) a rare basin-wide flood in late winter 1962, shortly before completion of Flaming Gorge Dam and (2) the largest post-dam bypass flood in 1983. Thick deposits of these ages occur in each trench, and this pattern correlates with the sequence of channel narrowing described by Allred and Schmidt (1999) 320 km downstream at the USGS gage near Green River, Utah. Our results suggest infrequent, controlled, high-magnitude dam releases may be an ineffective means of channel rejuvenation and vegetation control along vertically accreting, suspended sediment rivers. Where post-dam rivers are in a condition of sediment surplus, large floods may further isolate unwanted riparian vegetation from lower, more frequently disturbed hydrologic environments by increasing the elevation of the higher alluvial deposits.
Kress, Wade H.; Sebree, Sonja K.; Littin, Gregory R.; Drain, Michael A.; Kling, Michael E.
2005-01-01
The U.S. Geological Survey, in cooperation with The Central Nebraska Public Power and Irrigation District, conducted a study that used bathymetric and topographic surveying in conjunction with Geographical Information Systems techniques to determine the 2003 physical shape, current storage capacity, and the changes in storage capacity of Lake McConaughy that have occurred over the past 62 years. By combining the bathymetric and topographic survey data, the current surface area of Lake McConaughy was determined to be 30,413.0 acres, with a volume of 1,756,300 acre-feet at the lake conservation-pool elevation of 3,266.4 feet above North American Vertical Datum of 1988 (3,265.0 feet above Central datum). To determine the changes in storage of Lake McConaughy, the 2003 survey Digital Elevation Model (DEM) was compared to a preconstruction DEM compiled from historical contour maps. This comparison showed an increase in elevation at the dam site due to the installation of Kingsley Dam. Immediately to the west of the Kingsley Dam is an area of decline where a borrow pit for Kingsley Dam was excavated. The comparison of the preconstruction survey to the 2003 survey also was used to estimate the gross storage capacity reduction that occurred between 1941 and 2002. The results of this comparison indicate a gross storage capacity reduction of approximately 42,372 acre-feet, at the lake conservation-pool elevation of 3,266.4 feet in NAVD 88 (3,265.0 feet in Central datum). By comparing preconstruction and 2003 survey data and subtracting the Kingsley Dam and borrow pit, the total estimated net volume of sediment deposited over the past 62 years is 53,347,124 cubic yards, at an annual average rate of 860,437 cubic yards per year. The approximate decrease in the net storage capacity occurring over the past 62 years is 33,066 acre-feet, at an annual average decrease of approximately 533 acre-feet per year, which has resulted in a 1.8 percent decrease in storage capacity of Lake McConaughy. The lake has accumulated most of the sediment in the original river channel and in the west end of the delta area on the upstream end of the lake.
Wong, J H K; Brummelte, S; Galea, L A M
2011-11-01
Postpartum depression affects 15% of new mothers and previous depressive episodes increase the risk for postpartum depression. Chronic administration of corticosterone (CORT) to dams during the postpartum period causes depressive-like behaviour and has been used as a model of postpartum depression. To better understand the subsequent progress of this model, we examined whether there were persistent effects of CORT treatment during the dam's first postpartum period on maternal care and mood following a subsequent pregnancy. Sprague-Dawley female rats received either sesame oil (control) or CORT (40 mg/kg) injections for 22 days during their first postpartum period. Subsequently, all females were re-mated for a second time and neither group received treatment during the second postpartum period. Maternal care was observed from days 2-8 of each postpartum period and dams were tested in the forced-swim test on days 21 and 22 of the first and days 4 and 21 of the second postpartum period. As expected, the amount of time spent immobile in the forced-swim test was increased in CORT dams at the end of the first postpartum period; however, the amount of time spent immobile was decreased at the end of the second postpartum period relative to oil dams. Furthermore, dams treated with CORT in first postpartum period gave birth to a smaller litter with a larger male/female sex ratio after their second pregnancy. This implies that elevated stress hormone levels during the first postpartum period have a substantial influence on subsequent postpartum behaviour and litter characteristics. Further investigations are necessary to fully understand the effect of parity, experience during first motherhood, and hypothalamic-pituitary-adrenal axis regulation on postpartum depression. © 2011 The Authors. Journal of Neuroendocrinology © 2011 Blackwell Publishing Ltd.
7. VIEW WEST ALONG THE UPSTREAM SLOPE OF THE EMBANKMENT, ...
7. VIEW WEST ALONG THE UPSTREAM SLOPE OF THE EMBANKMENT, SHOWING ROCK PAVING IN PROGRESS.... Volume XIX, No. 7, June 24, 1940. - Prado Dam, Embankment, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Circuitous to single thread: post-dam geomorphic transformation of the Colorado River in its delta
NASA Astrophysics Data System (ADS)
Mueller, E. R.; Schmidt, J. C.
2017-12-01
The Colorado River in its delta has transformed from a maze of secondary and distributary channels to an intermittent or ephemeral stream largely disconnected from formerly active channels and floodplains. Periodic post-dam floods have demonstrated that channel migration and shifting during floods increased the extent and diversity of riparian vegetation, and suggested that restoration of fluvial processes that promote re-activation of these former channels may enhance ecosystem rehabilitation. But restoration efforts in the delta are complicated by the fact that the Colorado River has the largest reservoir size in relation to its mean annual flow of any large river in North America and most of its sediment supply is completely blocked in upstream reservoirs. As a result, small controlled floods intended to inundate formerly active channels and rejuvenate riparian vegetation must consider the new relationship between stream flow and the delta's transformed geomorphology. Post-dam channel change has been dominated by the abandonment of secondary and distributary channels, with 3 to 4 meters of bed incision in the upstream part of the delta that diminishes downstream. Initial bed incision of 2 to 3 meters occurred rapidly following completion of Hoover Dam in 1936, before further upstream water development reduced delta flows to near zero by the mid-1960s. The largest post-dam floods occurred in the 1980s, which resulted in 10s to 100s of meters of lateral migration, channel switching, and the reactivation of secondary channels and floodplains rarely inundated since dam completion. Smaller flow pulses in the 1990s and 2000s further incised the thalweg to its minimum elevation, resulting in a narrow single-thread channel inset within the multi-channel surface active during the 1980s. In 2014, an experimental pulse flow was released to the river channel with a peak discharge approximately 5% of the typical pre-dam flood peak. Topographic change was confined to the main channel where post-dam bed incision resulted in larger depths and flow velocities, although some secondary channels were inundated. Post-dam channel incision, combined with the rapid downstream loss of flow through infiltration, has reduced the area where secondary channels might be formed or re-activated during small controlled floods in the delta.
Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret
2003-09-01
The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated thatmore » Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater than observed in the past ten years averaged together. In 2002, about 87 million juvenile salmon were released from Federal, State, Tribal or private hatcheries into the Columbia River Basin above Bonneville Dam. This represents an increase over the past season, when only 71 million juvenile fish were released into the same area.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, J.; Garrow, L.
Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less
Nelson, Steven M.; Ramirez-Hernandez, Jorge; Rodriguez-Burgeueno, J. Eliana; Milliken, Jeff; Kennedy, Jeffrey R.; Zamora-Arroyo, Francisco; Schlatter, Karen; Santiago-Serrano, Edith; Carrera-Villa, Edgar
2017-01-01
As provided in Minute 319 of the U.S.-Mexico Water Treaty of 1944, a pulse flow of approximately 132 million cubic meters (mcm) was released to the riparian corridor of the Colorado River Delta over an eight-week period that began March 23, 2014 and ended May 18, 2014. Peak flows were released in the early part of the pulse to simulate a spring flood, with approximately 101.7 mcm released at Morelos Dam on the U.S.-Mexico border. The remainder of the pulse flow water was released to the riparian corridor via Mexicali Valley irrigation spillway canals, with 20.9 mcm released at Km 27 Spillway (41 km below Morelos Dam) and 9.3 mcm released at Km 18 Spillway (78 km below Morelos Dam). We used sequential satellite images, overflights, ground observations, water discharge measurements, and automated temperature, river stage and water quality loggers to document and describe the progression of pulse flow water through the study area. The rate of advance of the wetted front was slowed by infiltration and high channel roughness as the pulse flow crossed more than 40 km of dry channel which was disconnected from underlying groundwater and partially overgrown with salt cedar. High lag time and significant attenuation of flow resulted in a changing hydrograph as the pulse flow progressed to the downstream delivery points; two peak flows occurred in some lower reaches. The pulse flow advanced more than 120 km downstream from Morelos Dam to reach the Colorado River estuary at the northern end of the Gulf of California.
NASA Astrophysics Data System (ADS)
Eichhorn, Luise; Pirrung, Michael; Zolitschka, Bernd; Büchel, Georg
2017-09-01
Differentiating between regularly seasonal, irregular and event-based clastic sedimentation is difficult if sedimentation structures resemble and dating methods are imprecise. In this study - clastic light and dark laminae from lava-dammed Paleolake Alf in the Late Pleistocene in the Quaternary West Eifel Volcanic Field are analyzed to clarify how they formed and if they are of annual origin and comparable to assumed periglacial varves from neighboring Lake Holzmaar. Therefore, a multiproxy approach is applied combining sediment thin section analysis which focuses on composition and structure with 14C dates. The results are compared to recently-formed annually-laminated clastic sediments of, e.g., the High Canadian Arctic. Observed sedimentation structures reveal sediment delivery by over- and interflows and deposition from suspension forming two characteristic microfacies: Type I graded laminae and Type II laminae with graded sublayers. Additionally, erosional bases and event deposits indicate episodic underflows. Thus, lamination is potentially seasonal but is significantly veiled by extreme runoff causing erosion and resuspension processes or a mixed water body preventing sediment delivery into the lake basin. However, sedimentation processes between watershed and lake could be reconstructed by comparing recent and paleosediment structures.
Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodson, Guy; Pero, Vincent
Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less
Managing Tradeoffs between Hydropower and the Environment in the Mekong River Basin
NASA Astrophysics Data System (ADS)
Loucks, Daniel P.; Wild, Thomas B.
2015-04-01
Hydropower dams are being designed and constructed at a rapid pace in the Mekong/Lancang River basin in Southeast Asia. These reservoirs are expected to trap significant amounts sediment, decreasing much of the river's capability to transport nutrients and maintain its geomorphology and habitats. We apply a simulation model for identifying and evaluating alternative dam siting, design and operating policy (SDO) options that could help maintain more natural sediment regimes downstream of dams and for evaluating the effect of these sediment-focused SDO strategies on hydropower production and reliability. We apply this approach to the planned reservoirs that would prevent a significant source of sediment from reaching critical Mekong ecosystems such as Cambodia's Tonle Sap Lake and the Mekong delta in Vietnam. Model results suggest that various SDO modifications could increase sediment discharge from this site by 300-450% compared to current plans, but a 30-55% loss in short-term annual energy production depending on various configurations of upstream reservoirs. Simulation results also suggest that sediment management-focused reservoir operating policies could cause ecological damage if they are not properly implemented.
Statistical summaries of streamflow in Oklahoma through 1999
Tortorelli, R.L.
2002-01-01
Statistical summaries of streamflow records through 1999 for gaging stations in Oklahoma and parts of adjacent states are presented for 188 stations with at least 10 years of streamflow record. Streamflow at 113 of the stations is regulated for specific periods. Data for these periods were analyzed separately to account for changes in streamflow due to regulation by dams or other human modification of streamflow. A brief description of the location, drainage area, and period of record is given for each gaging station. A brief regulation history also is given for stations with a regulated streamflow record. This descriptive information is followed by tables of mean annual discharges, magnitude and probability of exceedance of annual high flows, magnitude and probability of exceedance of annual instantaneous peak flows, durations of daily mean flow, magnitude and probability of non-exceedance of annual low flows, and magnitude and probability of non-exceedance of seasonal low flows.
NASA Astrophysics Data System (ADS)
Piman, T.; Cochrane, T. A.; Arias, M. E.
2013-12-01
Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.
Rock Island Dam Smolt Monitoring; 1994-1995 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truscott, Keith B.; Fielder, Paul C.
1995-10-01
Downstream migrating salmon and steelhead trout (Oncorhynchus spp.) smolts were monitored at the Rock Island Dam bypass trap from April 1 - August 31, 1954. This was the tenth consecutive year that the bypass trap was monitored. Data collected included: (1) number of fish caught by species, (2) number of adipose clipped and/or Passive Integrated Transponder (PIT) tagged fish caught by species, (3) daily average riverflow, (4) daily average powerhouse No. 1 and No. 2 flows and daily average spill. These data were transmitted to the Fish Passage Center, which manages the Smolt Monitoring Program throughout the Columbia River Basin.more » The Smolt Monitoring Program is used to manage the {open_quotes}water budget{close_quotes}, releasing upstream reservoir water storage allocated to supplement river flows to enhance survival of downstream migrating juvenile salmonids. The Rock Island Dam trapping facility collected 37,795 downstream migrating salmonids in 1994. Collected fish included 4 yearling and 4 sub-yearling chinook salmon (O. tshawytscha) that had been previously PIT tagged to help determine migration rates. Additionally, 1,132 sub-yearling chinook, 4,185 yearling chinook, 6,627 steelhead, (O. mykiss) and 422 sockeye (O. nerka) with clipped adipose fins were collected. The middle 80% of the 1994 spring migration (excluding sub-yearling chinooks) passed Rock Island Dam during a 34 day period, April 25 - May 28. Passage rates of chinook and steelhead smolts released from hatcheries and the downstream migration timing of all salmonids are presented. The spring migration timing of juvenile salmonids is strongly influenced by hatchery releases above Rock Island Dam.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... (Five Year Program). The Annual Progress Report is available for review at: www.boem.gov/Five-Year-Program-Annual-Progress-Report/ . Information on the Five Year Program is available online at http://www... final on August 27, 2012, after the required 60-day congressional review period. Section 18(e) of the...
Annual peak streamflow and ancillary data for small watersheds in central and western Texas
Harwell, Glenn R.; Asquith, William H.
2011-01-01
Estimates of annual peak-streamflow frequency are needed for flood-plain management, assessment of flood risk, and design of structures, such as roads, bridges, culverts, dams, and levees. Regional regression equations have been developed and are used extensively to estimate annual peak-streamflow frequency for ungaged sites in natural (unregulated and rural or nonurbanized) watersheds in Texas (Asquith and Slade, 1997; Asquith and Thompson, 2008; Asquith and Roussel, 2009). The most recent regional regression equations were developed by using data from 638 Texas streamflow-gaging stations throughout the State with eight or more years of data by using drainage area, channel slope, and mean annual precipitation as predictor variables (Asquith and Roussel, 2009). However, because of a lack of sufficient historical streamflow data from small, rural watersheds in certain parts of the State (central and western), substantial uncertainity exists when using the regional regression equations for the purpose of estimating annual peak-streamflow frequency.
1980-03-01
conducting the annual inspection. Frank LaBombard Supt. of Water Department, Town of Russell * William Mikuski Chairman, Board of Selectmen - Russell Kevin ...m , -A a.. 5 5’ L’ Or 51.6 6 Or b.. 7 . . .. h . ;w WThs Waer Isnel at hole (1QW1,q fte. 95- Lop of bedrok. F1.. U..2 0. 2. - 01-16 LiT. 1.2.07 3f366...1 Ofto avt l.A. IWI’ * j. )u.nw 3im T 0 oft" !. . - 4- 1* 0 Poo 0..’ is.,.ft 2. 15-23 O AHWT s 1.. waer ei at. 1 belo I.: 7 31... lo00t. 6. 43-47*10
Peters, R.J.; Duda, J.J.; Pess, G.R.; Zimmerman, M.; Crain, P.; Hughes, Z.; Wilson, A.; Liermann, M.C.; Morley, S.A.; McMillan, J.; Denton, K.; Warheit, K.
2014-01-01
The restoration of the migration route to spawning and rearing habitats upstream of the former Glines Canyon Dam represents a great opportunity for salmon on the Olympic Peninsula. By removing two aging structures, it will be possible for all 5 species of salmon and steelhead to return to wild stretches of the Elwha River and major floodplain habitat characterized by multiple channels, as well as significant portions of numerous tributaries. Measuring the progress of restoration, from the perspective of both salmon populations and the ecosystem upon which they depend, is a great test for a collaborative team of scientists. The normally challenging conditions of working in a steep gradient, high velocity wilderness river are exacerbated by the release of millions of cubic yards of sediment that had accumulated in the reservoirs. After the first two years of the dam decommissioning process, this release has changed the ecology of the river, estuary, and nearshore habitats downstream of the dams. Our goal in developing the guidelines described is to provide a roadmap for tracking what hopefully will become a successful outcome. If successfully implemented, this information should prove useful as others begin planning for the removal, alteration, or reconstruction of dams throughout North America and elsewhere, an inevitable outcome of an aging dam infrastructure.
Finch, Colton G.; Pine, William E.; Yackulic, Charles B.; Dodrill, Michael J.; Yard, Michael D.; Gerig, Brandon S.; Coggins,, Lewis G.; Korman, Josh
2016-01-01
The Colorado River below Glen Canyon Dam, Arizona, is part of an adaptive management programme which optimizes dam operations to improve various resources in the downstream ecosystem within Grand Canyon. Understanding how populations of federally endangered humpback chub Gila cypha respond to these dam operations is a high priority. Here, we test hypotheses concerning temporal variation in juvenile humpback chub apparent survival rates and abundance by comparing estimates between hydropeaking and steady discharge regimes over a 3-year period (July 2009–July 2012). The most supported model ignored flow type (steady vs hydropeaking) and estimated a declining trend in daily apparent survival rate across years (99.90%, 99.79% and 99.67% for 2009, 2010 and 2011, respectively). Corresponding abundance of juvenile humpback chub increased temporally; open population model estimates ranged from 615 to 2802 individuals/km, and closed model estimates ranged from 94 to 1515 individuals/km. These changes in apparent survival and abundance may reflect broader trends, or simply represent inter-annual variation. Important findings include (i) juvenile humpback chub are currently surviving and recruiting in the mainstem Colorado River with increasing abundance; (ii) apparent survival does not benefit from steady fall discharges from Glen Canyon Dam; and (iii) direct assessment of demographic parameters for juvenile endangered fish are possible and can rapidly inform management actions in regulated rivers.
A predicted and controlled jøkulhlaup (GLOF) from Harbardsbreen, Norway.
NASA Astrophysics Data System (ADS)
Jackson, Miriam; Engeset, Rune; Elvehøy, Hallgeir
2016-04-01
A jøkulhlaup (GLOF) from Harbardsbreen, Norway in 2015 was predicted and the runoff of over five million cubic metres of water was released in a controlled manner through a hydropower reservoir. The glacier-dammed lake was investigated in early August and showed evidence (change in water-level, radial crevasses) of movement of water from the lake to subglacial storage. The water level in the glacier-dammed lake was over overburden pressure but the event didn't occur until two weeks later. There have been previous events from this glacier, with annual events between 1996 and 2001 due to glacier thinning. The glacier continued to thin substantially (20m) over the next decade but the next event didn't occur until 2010 when over five million cubic metres of water was released as well as additional runoff due to heavy precipitation and melting. At this time the reservoir couldn't accommodate the extra water and there was flow over the dam. Several glaciers in Norway have had one or several jøkulhlaups in the last fifteen years due to glacier thinning, and at several others, glacier-dammed lakes have appeared for the first time. Hydropower reservoirs are situated downstream from some of these glaciers, so such an event can have a beneficial effect. However, negative glacier mass balance and subsequent glacier thinning is increasing the magnitude and frequency of events.
DOE Office of Scientific and Technical Information (OSTI.GOV)
FLANAGAN,A; SCHACHTER,J.M; SCHISSEL,D.P
2003-02-01
A Data Analysis Monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one ormore » more diagnostics, or the presence of unanticipated phenomena in the plasma. This new system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, CLIPS to implement expert system logic, and displays its results to multiple web clients via HTML. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.« less
System to monitor data analyses and results of physics data validation between pulses at DIII-D
NASA Astrophysics Data System (ADS)
Flanagan, S.; Schachter, J. M.; Schissel, D. P.
2004-06-01
A data analysis monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded, thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one or more diagnostics, or the presence of unanticipated phenomena in the plasma. This system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, C Language Integrated Production System to implement expert system logic, and displays its results to multiple web clients via Hypertext Markup Language. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.
Spatial distribution of impacts to channel bed mobility due to flow regulation, Kootenai River, USA
Michael Burke; Klaus Jorde; John M. Buffington; Jeffrey H. Braatne; Rohan Benjakar
2006-01-01
The regulated hydrograph of the Kootenai River between Libby Dam and Kootenay Lake has altered the natural flow regime, resulting in a significant decrease in maximum flows (60% net reduction in median 1-day annual maximum, and 77%-84% net reductions in median monthly flows for the historic peak flow months of May and June, respectively). Other key hydrologic...
13. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
13. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. PIMA LATERAL DROP NEAR KENILWORTH, 5/10/26 - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ
Lower Granite Dam Smolt Monitoring Program, 2005-2006 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mensik, Fred; Rapp, Shawn; Ross, Doug
2007-01-01
The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam,more » 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers between years, considering both annual river flows and annual project operations, because both affect fish migration and collection.« less
Lower Granite Dam Smolt Monitoring Program, Annual Report 2005-2006.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Menski, Fred
2007-01-01
The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam,more » 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers between years, considering both annual river flows and annual project operations, because both affect fish migration and collection.« less
Spokane Tribal Hatchery, 2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peone, Tim L.
2005-03-01
Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery,more » Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the success of hatchery/net pen stocking on the number of harvestable fish. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue hatchery-rearing practices to reduce precocity rates of kokanee and continue new kokanee stocking strategies associated with increased kokanee harvest rates.« less
Project Planning for Cougar Dam during 2010
Haskell, Craig A.; Tiffan, Kenneth F.
2011-01-01
Cougar Dam is a 158 m-tall, rock fill dam located about 63 km east of Springfield, Oregon. Completed in 1963, the dam is owned and operated by the U.S. Army Corps of Engineers (USACE). It impounds Cougar Reservoir, which is 9.7 km long, has a surface area of 518 ha, and is predominately used for flood control. The pool elevation typically ranges from a maximum conservation pool of 515 m (1,690 ft) National Geodetic Vertical Datum (NGVD) in summer to a minimum flood control elevation of 467 m (1,532 ft NGVD) in winter. The reservoir thermally stratifies in the summer, has an average depth of 37 m, and holds 153,500 acre-feet when full. Cougar Dam is located on the South Fork of the McKenzie River 7 km upstream from the mainstem McKenzie River, a tributary of the Willamette River. The McKenzie River Basin basin supports the largest remaining population of wild spawning spring Chinook salmon in the Willamette River Basin (National Oceanic and Atmospheric Administration; NOAA, 2008). Cougar Dam and others were collectively deemed to cause jeopardy to the sustainability of anadromous fish stocks in the Willamette River Basin (NOAA, 2008). Prior to dam construction, as many as 805 redds were observed in the South Fork of the McKenzie River (Willis and others, 1960) and it is estimated that 40 km of spawning habitat were lost when access was blocked after dam construction. The 2008 Willamette Biological Opinion (BIOP) requires improvements to operations and structures to reduce impacts on Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR steelhead (O. mykiss; NOAA, 2008). In 2010, an adult fish collection facility was completed below Cougar Dam to collect returning adult salmon for transport to spawning habitats above the dam. Before that time, returning adult spring Chinook salmon were transported to upstream spawning areas as part of a trap-and-haul program with adults passed ranging annually from 0 to 1,038 (Taylor, 2000). The progeny of adult fish that are allowed to spawn above Cougar Dam move downstream into Cougar Reservoir in the spring. Under the BIOP, the USACE is required to provide downstream fish passage or operational alternatives at Cougar Dam by 2014. Currently, there is little information about the seasonal timing of reservoir entry of juvenile Chinook salmon and what habitats they and other fishes use in the reservoir. However, rotary screw traps placed in the outlet channel below the dam indicate peak juvenile passage coinciding with seasonally low pool elevation in mid December and late January. It is unknown whether juveniles upstream of Cougar Dam can be captured in large enough numbers for tagging and subsequent survival studies to proceed. These studies are needed to examine the feasibility of installing downstream fish passage structures at Cougar Dam to meet BIOP requirements. Therefore, the USACE contracted with the U.S. Geological Survey (USGS) to test the efficacy of using a mid-water trawl and lampara seine to capture fish in Cougar Reservoir on three consecutive days in the fall of 2010. These collection methods could potentially provide fish for feasibility and subsequent survival studies and as verification of fish targets in future active hydroacoustic surveys.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam in 2003. This was the eighth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 437,633 yearlings released from the Fall Chinook Acclimation Project facilities were short of the 450,000 fish quota.more » We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,492 PIT tagged yearlings from Pittsburg Landing, 7,494 from Big Canyon and 2,497 from Captain John Rapids. Fish health sampling indicated that, overall, bacterial kidney disease levels at the acclimation facilities could be considered medium with 37-83% of the fish sampled rating medium to very high. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 153.7 mm (153.2-154.2 mm) at Captain John Rapids to 164.2 mm (163.9-164.5 mm) at Pittsburg Landing. Mean condition factors ranged from 1.06 at Lyons Ferry Hatchery to 1.22 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 83.1% (80.7-85.5%) for Big Canyon to 91.7% (87.7-95.7%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 59.9% (54.6-65.2%) for Big Canyon to 69.4% (60.5-78.4%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 5.8 river kilometers per day (rkm/d) for Captain John Rapids to 16.2 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 11.7 rkm/d for Captain John Rapids to 17.6 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 8-15 days to Lower Granite Dam and 22-27 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from the FCAP facilities, ranged from April 23-25. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups ranged from May 4-10.« less
Accident study of torrential protective structures based on the French RTM database
NASA Astrophysics Data System (ADS)
Boncompain, Ingrid; Quefféléan, Yann; Carladous, Simon
2017-04-01
Torrential protective structures such as dikes, sediment traps, and check dams aim to reduce damage on elements at risk. They are built given a reference scenario. Nevertheless, this scenario can be exceeded or structures can fail because of their design or their ageing. We later talk about "accidents". The 1996 Aras disaster near Biescas (Spain) showed that consequences can be significant: 35 of 40 check dams were destroyed which involved 87 fatalities in a campsite. The accident probability and its consequences must be taken into account to analyze risk. Databases are useful tools to extract needed information. In France, the Restoration of Mountainous Areas department (RTM) has been public funded to develop a database, specific to mountainous areas (the Alps and the Pyrenees). Almost 12 500 check dams, 80 sediment traps and 600 dikes were registered in public forests in 2011. These samples were assumed significant for check dams and sediment traps but not for dikes because the most part was missing. In parallel, more than 31 000 torrential events were registered. Given these elements, an accident study was developed. We first extracted 1 925 events with accidents on protective structures: 39 % occurred during the 19th century and 53 % have occurred since 1900. Sediment traps were involved in 37 events, check dams in 336, and dikes in 1488. Then, a detailed analysis was specifically carried out for check dams. Event phenomena were extracted: torrential flood, liquid flood, snow avalanche, rock fall, and landslide. Accident typology was also specified: scouring, breaking of several check dams, total or partial destruction of one structure, overflowing. Causes of accidents on check dams were first analyzed. Torrential floods were responsible of 85 % of events (284 of 336) even if other phenomena must be also taken into account. Almost 45 % of events (152 of 336) involved total destruction of one or several check dams. Taking into account events for the last 150 years, 30 events were registered with destruction of several check dams: the annual probability of occurrence is 3.10-4. Analyzing consequences, only 11 of previously retained events (1925) were registered with fatalities. Finally, these quantitative elements were compared to qualitative feedback analysis from field practitioners and were illustrated with the 1987 Saint-Antoine event, in Modane. The total or partial destruction of 25 check dams released between 20 000 and 30 000 m3, which was one third of the estimated debris flow volume (85 000 m3) which damaged an industrial area. The lack of their maintenance partially explained this accident. As a conclusion, we must keep in mind that these results are limited to available data (all events have not been necessarily reported). Accidents on check dams are rare according to these data. It can be due to their general maintenance. This first analysis could be improved taking into account expert analysis, completing with information from other countries databases and formalizing the approach through a dependability analysis framework.
Risk Perception Analysis Related To Existing Dams In Italy
NASA Astrophysics Data System (ADS)
Solimene, Pellegrino
2013-04-01
In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.
Rachol, Cynthia M.; Fitzpatrick, Faith A.; Rossi, Tiffiny
2005-01-01
In a study to understand the historical effects of the construction and decommissioning of dams on the Kalamazoo River, Plainwell to Otesgo, Michigan, and to simulate channel changes that may result if the dams were removed, early to mid-1800s General Land Office surveys and aerial photographs from 1938, 1981, and 1999 were compared in order to identify historical changes in the river’s planform. This analysis of the 80-mile reach from Morrow Dam to the river mouth at Saugatuck provided insight into how susceptible the river has been to channel migration. The comparison showed that changes in channel width and location were caused mainly by construction of dams and subsequent water-level adjustments in the impounded reaches upstream from the dams. Braiding also occurred downstream from one of the dams. Minor changes in channel form that were not caused by the dams, such as the development and cutoff of meander bends, were observed. A more detailed study in a 5-mile reach passing through the Plainwell and Otsego City Dams included compiling existing valley cross section and longitudinal profile data into a database, assessing bank stability, and using a hydrologic model to simulate the channel as if the dams were removed. Fifty-four valley cross sections compiled from United States Geological Survey and consultant data sets were used as a base for a bank-stability assessment and to design a hypothetical stable channel without the two dams. The channel design involved adjusting the slope, hydraulic geometry, and floodplain width to ensure that water could be transferred through the reach without increasing flooding or erosion problems. The bank-stability assessment focused on conditions that are critical to failure. This was accomplished through the use of a two step process. The first involved evaluating the sediment removed from the bank toe when the stage is high. The second involved calculating the factor of safety for the bank based on the water table being elevated higher than the stage, mimicing a bank storage effect. Using these paired proccesses, two scenarios of critical conditions were evaluated: dams present and dams removed. Results of the bank assessments showed that, under both critical-condition scenarios, the streambanks were more susceptible to toe erosion than to block failure. As toe erosion progresses, the banks will eventually collapse as supporting material underneath is removed. Toe erosion for the damsremoved scenario resulted in higher amounts of erosion than for the dams-present scenario, leading to an overall decrease in bank stability. Effects of vegetation on the bank stability were variable; stability for some banks increase if vegetation was present but remain the same for other banks.
Tailings dams stability analysis using numerical modelling of geotechnical and geophysical data
NASA Astrophysics Data System (ADS)
Mihai, S.; Zlagnean, M.; Oancea, I.; Petrescu, A.
2009-04-01
Methods for monitoring seepage and detecting internal erosion are essential for the safety evaluation of embankment dams. Internal erosion is one of the major reasons for embankment dam failures, and there are thousands of large tailings dams and waste-rock dumps in the world that may pe considered as hotspots for environmental impact. In this research the geophysical survey works were performed on Cetatuia 2 tailings dam. Electrical resistivity imaging (ERI) method was able to detect spatially anomalous zones inside the embankment dam. These anomalies are the results of internal erosion phenomena which may progressing inside the dam and is difficult to detect by conventional methods. Data aquired by geophysical survey together with their interpretations were used in the numerical model for slope stability assessment. The final results show us the structural weakness induced by the presence of internal erosion elements especially for seismic loading case. This research methodology may be also available for tailings dam monitoring purposes. Electrical Rezistivity Imaging (ERI) was performed on Cetatuia 2 dam at the Uranium Milling Plant Feldioara, in order to map areas with lateral and vertical changes in resistivity. The electrodes are connected to an automated computer operated switch box that selects the 4 electrodes to be used. A computer controls the switch box and the measuring device, and runs a program that selects the electrodes, makes the measurement, and stores the measurement. For inversion processing procedures was used Res2Din software. The measured resistivity were plotted by the pseudo section contouring method. There are five resistivity pseudosections obtained from the Cetatuia 2 tailings dam during the october 2007 measurements. Four transversal profiles trans1 to trans4 are perpendicular to the berms and the longitudinal one long1 is placed along dam's crest. The high resistivities near the berms surfaces corresponds to unsaturated fill materials and the low resistivities near the crest correspond to water saturated material. The resistivities values greater then 80 ohm.m may be explained by some error obtained for that inversion model. Profiles trans3 and trans4 were measured on perpendicular directions to berm alignment and show two distinct zones. The upward low resistivities zone correspond to water saturated materials especially from the compacted clay dam's core and the downward high resistivities zone belongs to unsaturated fill materials. The boundary between high and low resistivity at the depth of about 5 to 7 meters shows the groundwater level. The continuation of the high resistivity zones towards the end of the profile trans3, which is different from other profiles is probably due to the presence of dry coarse materials in shallow depth correspondingly to sandy clay. The sand fractions from the clay matrix may be affected by internal erosional phenomena, due to seepage currents that overpassed the material critical gradient. In this case the relative high resistivities values were considered as a presumptive erosional pattern. This profile was considered for the slope stability finite element modelling. The profile long1 which is placed along dam's crest is the longest profiles and extends up to nearly 420 m. The boundary between high and low resistivity at the depth of about 4 to 8 meters shows the groundwater across the dam core. The central part of the profile (about meter 200) shows the same relative high resistivities that occurred on transversal profile trans3. Resistivity data was used for building the 3D electrical resistivity model. The water saturated materials have locations very close to dam's crest (resistivity values usually lower then 10 ohm.m) and on both dam's arms. The groundwater levels were confirmed by the piezometric measurements. Electrical Rezistivity Imaging method had the possibility to show the most important disturbant elements that in certain conditions may weak the dam's state of safety. This study considered the SSR (Shear Strength Reduction) technique for slope stability numerical modelling. In the SSR finite element technique, elasto-plastic strength is assumed for dam's materials and shear strengths are progressively reduced until collapse occurs. Numerical modelling was performed on the most critical profile choosed through analysis of geophysical and geotechnical informational volume achieved by insitu or in laboratory tests. Finite element analysis were considered in two situations: first, before geophysical investigations and second considering the whole informational of data achieved. Both situations were analysed in static and pseudo-static conditions. The factor of safety before geophysical investigations is high enough to describe a stable state of stability even for the seismic load. The total displacement distributions were modified by the presence of internal erosional element giving a high state of instability, especially for the pseudo-static case. These analysis using the finite element method prove the importance of structural disturbance elements that may occure inside the dam body produced by internal erosional processes.
Effect of Sediment Availability in Bedload-Dominated Rivers on Fluvial Geomorphic Equilibrium
NASA Astrophysics Data System (ADS)
Marti, M.
2016-12-01
Channels are known to compensate for changes in sediment supply via covariate changes in channel properties, yet the timescale for adjustment remains poorly constrained. We propose that reductions in sediment flux inhibit equilibrium re-establishment and thus impact the timescale of system adjustment. Using run-of-river dams as natural experiments, this study quantifies the geomorphic response of channels to sediment supply reduction. Channel traits that facilitate increased sediment trapping behind the dam, such as large reservoir storage capacity relative to annual inflow and low slope, were expected to inhibit a channel's ability to re-establish equilibrium following impoundment, lengthening the equilibrium establishment timescale to tens or hundreds of years. Reaches associated with increased trapping were therefore anticipated to exhibit non-equilibrium forms. Channel equilibrium was evaluated downstream of 8 ROR dams in New England with varying degrees of sediment trapping. Sites cover a range of watershed sizes (3-155 km2), channel slopes (.05-5%), 2-year discharges (1.5-60 m3/s) and storage capacity volumes. Because equilibrium channel form is just sufficient to mobilize grains under bankfull conditions in bedload-dominated rivers, the Shields parameter was used to assess equilibrium form. Unregulated, upstream Shields values and regulated, downstream values were calculated at 14 total cross-sections extending 300-450 m upstream and downstream of each dam. Sediment trapping was estimated using Brune's curve (1953). On the Charles Brown Brook (VT), a marginally significant (p=0.08) increase in Shields values from a mean of 0.14 upstream to 0.41 downstream of a 100+ year old dam was observed. In contrast, reaches downstream of the 100+ year old Pelham dam (MA) exhibit significantly lower Shields values. This suggests that trapping behind the dam inhibits the downstream channel from reaching an equilibrium state, but not always in the same way. Better understanding of geomorphic response to reduced sediment flux as a control on equilibrium establishment will broaden the knowledge of geomorphic equilibrium and aid in management of regulated, bedload-dominated rivers.
Storing and sharing water in sand rivers: a water balance modelling approach
NASA Astrophysics Data System (ADS)
Love, D.; van der Zaag, P.; Uhlenbrook, S.
2009-04-01
Sand rivers and sand dams offer an alternative to conventional surface water reservoirs for storage. The alluvial aquifers that make up the beds of sand rivers can store water with minimal evaporation (extinction depth is 0.9 m) and natural filtration. The alluvial aquifers of the Mzingwane Catchment are the most extensive of any tributaries in the Limpopo Basin. The lower Mzingwane aquifer, which is currently underutilised, is recharged by managed releases from Zhovhe Dam (capacity 133 Mm3). The volume of water released annually is only twice the size of evaporation losses from the dam; the latter representing nearly one third of the dam's storage capacity. The Lower Mzingwane valley currently support commercial agro-businesses (1,750 ha irrigation) and four smallholder irrigation schemes (400 ha with provision for a further 1,200 ha). In order to support planning for optimising water use and storage over evaporation and to provide for more equitable water allocation, the spreadsheet-based balance model WAFLEX was used. It is a simple and userfriendly model, ideal for use by institutions such as the water management authorities in Zimbabwe which are challenged by capacity shortfalls and inadequate data. In this study, WAFLEX, which is normally used for accounting the surface water balance, is adapted to incorporate alluvial aquifers into the water balance, including recharge, baseflow and groundwater flows. Results of the WAFLEX modelling suggest that there is surplus water in the lower Mzingwane system, and thus there should not be any water conflicts. Through more frequent timing of releases from the dam and maintaining the alluvial aquifers permanently saturated, less evaporation losses will occur in the system and the water resources can be better shared to provide more irrigation water for smallholder farmers in the highly resource-poor communal lands along the river. Sand dams are needed to augment the aquifer storage system and improve access to water. An alternative to the current scenario was modelled in WAFLEX: making fuller use of the alluvial aquifers upstream and downstream of Zhovhe Dam. These alluvial aquifers have an estimated average water storage capacity of 0.37 Mm3 km
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blenden, Michael L.; Kucera, Paul A.; Osborne, Randall S.
1996-04-01
For the second consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 6 to June 20, 1995. We PIT tagged and released 421 wild chinook salmon smolts, 747 hatchery chinook salmon smolts (445 HxW and 302 HxH), 227 wild steelhead trout smolts and 1,296 hatchery steelhead trout smolts. Cumulative interrogation rates at mainstem Snake and Columbia River dams were 78.4% for wildmore » chinook salmon, 58.9% for hatchery chinook salmon (HxW), 56.6% for hatchery chinook salmon (HxH), 76.2% for wild steelhead trout, and 69.2% for hatchery steelhead trout. Peak outmigration of NPT tagged wild Imnaha River chinook salmon smolts occurred from early to mid-May at Lower Granite, Little Goose, and Lower Monumental Dams. Median and 90% passage dates for wild chinook salmon smolts at Lower Granite Dam were May 1 and May 11, respectively. Continuous spill at Lower Granite Dam was initiated on May 3 and lasted for 51 days. The 90% passage date of wild chinook salmon smolts at Lower Granite Dam (May 11) preceded peak Snake River and Lower Granite (June 6) flows by 26 days. Although hatchery chinook salmon exhibited a shorter outmigration period through the Snake River than their wild counterparts, peak arrival for both groups occurred at approximately the same time. Median and 90% passage dates at Lower Granite Dam for other PIT tagged groups were: hatchery chinook salmon (NPT-HxW) - May 2 and May 13; hatchery chinook salmon (FPC-HxH) - May 8 and May 15; wild steelhead trout - May 2 and May 9; and hatchery steelhead trout (NPT and FPC) - May 31 and June 16. Hatchery steelhead trout displayed small peaks in arrival timing at Lower Granite and Little Goose Dams in mid-May to mid-June.« less
Cooper, D.J.; Andersen, D.C.
2012-01-01
Dam releases used to create downstream flows that mimic historic floods in timing, peak magnitude and recession rate are touted as key tools for restoring riparian vegetation on large regulated rivers. We analysed a flood on the 5th-order Green River below Flaming Gorge Dam, Colorado, in a broad alluvial valley where Fremont cottonwood riparian forests have senesced and little recruitment has occurred since dam completion in 1962. The stable post dam flow regime triggered the development of novel riparian communities with dense herbaceous plant cover. We monitored cottonwood recruitment on landforms inundated by a managed flood equal in magnitude and timing to the average pre-dam flood. To understand the potential for using managed floods as a riparian restoration tool, we implemented a controlled and replicated experiment to test the effects of artificially modified ground layer vegetation on cottonwood seedling establishment. Treatments to remove herbaceous vegetation and create bare ground included herbicide application (H), ploughing (P), and herbicide plus ploughing (H+P). Treatment improved seedling establishment. Initial seedling densities on treated areas were as much as 1200% higher than on neighbouring control (C) areas, but varied over three orders of magnitude among the five locations where manipulations were replicated. Only two replicates showed the expected seedling density rank of (H+P)>P>H>C. Few seedlings established in control plots and none survived 1 year. Seedling density was strongly affected by seed rain density. Herbivory affected growth and survivorship of recruits, and few survived nine growing seasons. Our results suggest that the novel plant communities are ecologically and geomorphically resistant to change. Managed flooding alone, using flows equal to the pre-dam mean annual peak flood, is an ineffective riparian restoration tool where such ecosystem states are present and floods cannot create new habitat for seedling establishment. This problem significantly limits long-term river and riparian management options. ?? 2010 John Wiley & Sons, Ltd.
Topping, David J.; Schmidt, John C.; Vierra, L.E.
2003-01-01
A gaging station has been operated by the U.S. Geological Survey at Lees Ferry, Arizona, since May 8, 1921. In March 1963, Glen Canyon Dam was closed 15.5 miles upstream, cutting off the upstream sediment supply and regulating the discharge of the Colorado River at Lees Ferry for the first time in history. To evaluate the pre-dam variability in the hydrology of the Colorado River, and to determine the effect of the operation of Glen Canyon Dam on the downstream hydrology of the river, a continuous record of the instantaneous discharge of the river at Lees Ferry was constructed and analyzed for the entire period of record between May 8, 1921, and September 30, 2000. This effort involved retrieval from the Federal Records Centers and then synthesis of all the raw historical data collected by the U.S. Geological Survey at Lees Ferry. As part of this process, the peak discharges of the two largest historical floods at Lees Ferry, the 1884 and 1921 floods, were reanalyzed and recomputed. This reanalysis indicates that the peak discharge of the 1884 flood was 210,000?30,000 cubic feet per second (ft3/s), and the peak discharge of the 1921 flood was 170,000?20,000 ft3/s. These values are indistinguishable from the peak discharges of these floods originally estimated or published by the U.S. Geological Survey, but are substantially less than the currently accepted peak discharges of these floods. The entire continuous record of instantaneous discharge of the Colorado River at Lees Ferry can now be requested from the U.S. Geological Survey Grand Canyon Monitoring and Research Center, Flagstaff, Arizona, and is also available electronically at http://www.gcmrc.gov. This record is perhaps the longest (almost 80 years) high-resolution (mostly 15- to 30-minute precision) times series of river discharge available. Analyses of these data, therefore, provide an unparalleled characterization of both the natural variability in the discharge of a river and the effects of dam operations on a river. Following the construction and quality-control checks of the continuous record of instantaneous discharge, analyses of flow duration, sub-daily flow variability, and flood frequency were conducted on the pre- and post-dam parts of the record. These analyses indicate that although the discharge of the Colorado River varied substantially prior to the closure of Glen Canyon Dam in 1963, operation of the dam has caused changes in discharge that are more extreme than the pre-dam natural variability. Operation of the dam has eliminated flood flows and base flows, and thereby has effectively 'flattened' the annual hydrograph. Prior to closure of the dam, the discharge of the Colorado River at Lees Ferry was lower than 7,980 ft3/s half of the time. Discharges lower than about 9,000 ft3/s were important for the seasonal accumulation and storage of sand in the pre-dam river downstream from Lees Ferry. The current operating plan for Glen Canyon Dam no longer allows sustained discharges lower than 8,000 ft3/s to be released. Thus, closure of the dam has not only cut off the upstream supply of sediment, but operation of the dam has also largely eliminated discharges during which sand could be demonstrated to accumulate in the river. In addition to radically changing the hydrology of the river, operation of the dam for hydroelectric-power generation has introduced large daily fluctuations in discharge. During the pre-dam era, the median daily range in discharge was only 542 ft3/s, although daily ranges in discharge exceeding 20,000 ft3/s were observed during the summer thunderstorm season. Relative to the pre-dam period of record, dam operations have increased the daily range in discharge during all but 0.1 percent of all days. The post-dam median daily range in discharge, 8,580 ft3/s, exceeds the pre-dam median discharge of 7,980 ft3/s. Operation of the dam has also radically changed the frequency of floods on the Colorado River at Lees Ferry. The frequency of f
Hallwass, Gustavo; Lopes, Priscila F; Juras, Anastácio A; Silvano, Renato A M
2013-03-01
The long-term impacts of large hydroelectric dams on small-scale fisheries in tropical rivers are poorly known. A promising way to investigate such impacts is to compare and integrate the local ecological knowledge (LEK) of resource users with biological data for the same region. We analyzed the accuracy of fishers' LEK to investigate fisheries dynamics and environmental changes in the Lower Tocantins River (Brazilian Amazon) downstream from a large dam. We estimated fishers' LEK through interviews with 300 fishers in nine villages and collected data on 601 fish landings in five of these villages, 22 years after the dam's establishment (2006-2008). We compared these two databases with each other and with data on fish landings from before the dam's establishment (1981) gathered from the literature. The data obtained based on the fishers' LEK (interviews) and from fisheries agreed regarding the primary fish species caught, the most commonly used type of fishing gear (gill nets) and even the most often used gill net mesh sizes but disagreed regarding seasonal fish abundance. According to the interviewed fishers, the primary environmental changes that occurred after the impoundment were an overall decrease in fish abundance, an increase in the abundance of some fish species and, possibly, the local extinction of a commercial fish species (Semaprochilodus brama). These changes were corroborated by comparing fish landings sampled before and 22 years after the impoundment, which indicated changes in the composition of fish landings and a decrease in the total annual fish production. Our results reinforce the hypothesis that large dams may adversely affect small-scale fisheries downstream and establish a feasible approach for applying fishers' LEK to fisheries management, especially in regions with a low research capacity.
Environmental Flow Assessments in the McKenzie and Santiam River Basins, Oregon
NASA Astrophysics Data System (ADS)
Risley, J. C.; Bach, L.; Budai, C.; Duffy, K.
2012-12-01
The McKenzie and Santiam Rivers are tributaries of the Willamette River in northwestern Oregon, draining areas of 3,370 and 4,690 square kilometers, respectively. The river basins are heavily forested and contain streams that historically provided critical habit for salmonid rearing, salmonid spawning, and bull trout. In the 1950s and 1960s, hydropower and flood control dams were constructed in both basins. In 2008, the U.S. Geological Survey (USGS), in cooperation with The Nature Conservancy (TNC) and the U.S. Army Corps of Engineers (Corps), began assessing the impacts of dam regulation in the two basins on streamflow, geomorphic, and ecological processes (Risley et. al., 2010; 2012). The baseline assessments were made under the auspices of the Sustainable Rivers Project (SRP), formed in 2002 by TNC and the Corps. SRP is a nation-wide partnership aimed at developing, implementing, and refining environmental flows downstream of dams. Environmental flows can be defined as the streamflow needed to sustain ecosystems while continuing to meet human needs. Determining environmental flows is an iterative collective process involving stakeholders, workshops, bio-monitoring, and follow-up assessments. The dams on the McKenzie and Santiam Rivers have decreased the frequency and magnitude of floods and increased the magnitude of low flows. In the Santiam River study reaches, for example, annual 1-day maximum streamflows decreased by 46-percent on average because of regulated streamflow conditions. Annual 7-day minimum flows in six of the seven study reaches increased by 146 percent on average. On a seasonal basis, median monthly streamflows in both river basins decreased from February to May and increased from September to January. However, the magnitude of these impacts usually decreased farther downstream from the dams because of the cumulative inflow from unregulated tributaries and groundwater discharge below the dams. In addition to streamflow assessments, the USGS studies included a geomorphic and ecological characterization of both rivers using reach characterization, historical channel mapping, aerial photography, and specific gage analysis methods. Decreased flooding and decreased sediment supply resulting from the dams likely contributed to a decrease in gravel bars, which are critical to salmonid spawning. Secondary channel features and sinuosity also decreased. However, other anthropogenic factors, such as bank stabilization revetments, land filling, and channel dredging, have also impacted channel morphology in both basins. Exemplar native terrestrial and aquatic species of interest and used in developing environmental flows for both river basins include black cottonwood, red alder, bull trout, spring Chinook, Oregon chub, red-legged frogs, and western pond turtles. Suggestions for future bio-monitoring and investigations were also provided in the study reports. References: Risley, John, Wallick, J.R., Waite, Ian, and Stonewall, Adam, 2010, Development of an environmental flow framework for the McKenzie River basin, Oregon: U.S. Geological Survey Scientific Investigations Report 2010-5016, 94 p. Risley, J.C., Wallick, J.R., Mangano, J.F., and Jones, K.F., 2012, An environmental streamflow assessment for the Santiam River basin, Oregon: U.S. Geological Survey Open-File Report 2012-1133, 66 p.
Fast changes in seasonal forest communities due to soil moisture increase after damming.
do Vale, Vagner Santiago; Schiavini, Ivan; Araújo, Glein Monteiro; Gusson, André Eduardo; Lopes, Sérgio de Faria; de Oliveira, Ana Paula; do Prado-Júnior, Jamir Afonso; Arantes, Carolina de Silvério; Dias-Neto, Olavo Custodio
2013-12-01
Local changes caused by dams can have drastic consequences for ecosystems, not only because they change the water regime but also the modification on lakeshore areas. Thus, this work aimed to determine the changes in soil moisture after damming, to understand the consequences of this modification on the arboreal community of dry forests, some of the most endangered systems on the planet. We studied these changes in soil moisture and the arboreal community in three dry forests in the Araguari River Basin, after two dams construction in 2005 and 2006, and the potential effects on these forests. For this, plots of 20 m x 10 m were distributed close to the impoundment margin and perpendicular to the dam margin in two deciduous dry forests and one semi-deciduous dry forest located in Southeastern Brazil, totaling 3.6 ha sampled. Besides, soil analysis were undertaken before and after impoundment at three different depths (0-10, 20-30 and 40-50 cm). A tree (minimum DBH of 4.77 cm) community inventory was made before (TO) and at two (T2) and four (T4) years after damming. Annual dynamic rates of all communities were calculated, and statistical tests were used to determine changes in soil moisture and tree communities. The analyses confirmed soil moisture increases in all forests, especially during the dry season and at sites closer to the reservoir; besides, an increase in basal area due to the fast growth of many trees was observed. The highest turnover occurred in the first two years after impoundment, mainly due to the higher tree mortality especially of those closer to the dam margin. All forests showed reductions in dynamic rates for subsequent years (T2-T4), indicating that these forests tended to stabilize after a strong initial impact. The modifications were more extensive in the deciduous forests, probably because the dry period resulted more rigorous in these forests when compared to semideciduous forest. The new shorelines created by damming increased soil moisture in the dry season, making plant growth easier. We concluded that several changes occurred in the T0-T2 period and at 0-30 m to the impoundment, mainly for the deciduous forests, where this community turned into a "riparian-deciduous forest" with large basal area in these patches. However, unlike other transitory disturbances, damming is a permanent alteration and transforms the landscape to a different scenario, probably with major long-term consequences for the environment.
NASA Astrophysics Data System (ADS)
Blum, M. D.; Viparelli, E.; Sulaiman, Z. A.; Pettit, B. S.
2016-12-01
More than 40,000 dams have been constructed in the Mississippi River drainage basin, which has had a dramatic impact on suspended sediment load for the Mississippi delta. The most significant dams were constructed in the 1950s on the Missouri River in South Dakota, after which total suspended loads for the lower Mississippi River, some 2500 km downstream, were cut in half: gauging station data from the Missouri-Mississippi system show significant load reductions immediately after dam closure, followed by a continued downward trend since that time. The delta region is experiencing tremendous land loss in response to acceleration of global sea-level rise, and load reductions of this magnitude may place severe limits on mitigation efforts. Here we examine sediment export from the Missouri system due to bed scour. The US Army Corps of Engineers has compiled changes in river stage at constant discharge for 8 stations between the lowermost dam at Yankton, South Dakota and the Missouri-Mississippi confluence at St. Louis (a distance of 1250 river km), for the period 1930-2010, which we have updated to 2015. These data show two general reaches of significant bed degradation. The first extends from the last major dam at Yankton, South Dakota downstream 300 km to Omaha, Nebraska, where degradation in response to the dam exceeds 3 m. The second reach, with >2.5 m of degradation, occurs in and around Kansas City, Missouri, and has been attributed to river training activities. The reach between Omaha and Kansas City, as well as the lower Missouri below Kansas City, show <1 m of net bed elevation change over the entire 75-year period of record. Integrating bed elevation changes over the period of record, we estimate a total of 1.1-1.2 billion tons of sediment have been exported from the Missouri River due to bed scour following dam construction and river training. This number equates to 20-25 million tons per year, which is sufficient to account for 30% of the total Missouri River load, and 15% of the total post-dam annual sediment load for the lower Mississippi River. For perspective, the quantity of sediment exported from the Missouri River due to bed scour is greater than the total load for all rivers in the US lower 48 states, except the Mississippi and Colorado Rivers, and would rank in the top 50 of all rivers in the modern world.
Natural radioactivity investigation in Dam sediments of northeast Algeria using gamma spectroscopy
NASA Astrophysics Data System (ADS)
Benrachi, Fatima; Bouhila, Ghania; Saadi, Asma; Ramdhane, Mourad
2017-09-01
Current research paper intends to estimate the natural radioactivity levels in sediments samples collected from Beni Haroun Dam in the northeast Algeria, using high resolution HPGe detector. The mean activity concentrations values measured for the radionuclides 232Th, 226Ra and 40K are 18.9 ± 1.9, 37.3 ± 2.7 and 149.9 ± 5.5 Bq/kg, respectively. The 137Cs anthropogenic radionuclide has been observed with maximum activity concentration value of 0.8 ± 0.4 Bq/kg, which is considered an insignificant amount. In order to assess the radiological threat of gamma radiations emitted by these radionuclides on the health of the population, absorbed dose rate, annual effective dose equivalent and radiation hazard indices were had been calculated. The obtained values are compared with the world wide average ones.
Lower Granite Dam Smolt Monitoring Program, 1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Verhey, Peter; Morrill, Charles; Mensik, Fred
1999-01-01
The 1999 fish collection season at Lower Granite was characterized by high spring flows and spill, low levels of debris, cool water temperatures, increased hatchery chinook numbers, and an overall decrease in numbers of smolts collected and transported. A total of 5,882,872 juvenile salmonids were collected at Lower Granite. Of these, 5,466,057 were transported to release sites below Bonneville Dam, 5,232,105 by barge and 233,952 by truck. An additional 339,398 fish were bypassed back to the river. A total of 117,609 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 440,810 smoltsmore » (7.5% of the total collected) of which 247,268 were PIT tagged and 572 were recorded as incidental mortalities.« less
Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load
Magirl, Christopher S.; Hilldale, Robert C.; Curran, Christopher A.; Duda, Jeffrey J.; Straub, Timothy D.; Domanski, Marian M.; Foreman, James R.
2015-01-01
The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 ± 3 million m3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 ± 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 ± 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m3/s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 ± 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 ± 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload-surrogate instruments indicated detectable bedload starting just after full removal of the downstream dam. Using comparative studies from other sediment-laden rivers, the total ungauged fraction of < 2-mm bedload was estimated to be on the order of 1.5 Mt.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2012-0938; FRL-9374-7] Pesticide Reregistration Performance Measures and Goals; Annual Progress Report; Notice of Availability AGENCY: Environmental... EPA's progress report in meeting its performance measures and goals for pesticide reregistration...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2011-0959; FRL-9343-5] Pesticide Reregistration Performance Measures and Goals; Annual Progress Report; Notice of Availability AGENCY: Environmental... EPA's progress report in meeting its performance measures and goals for pesticide reregistration...
A pseudo-outbreak of skin disease in British troops.
Croft, A; Smith, H; Creamer, I
1996-01-01
When a newspaper report claimed that a serious outbreak of skin disease had occurred in British Army troops stationed at the Bocac Dam, in western Bosnia, all troops at the Bocac Dam location (n = 96), followed by a matched control group of troops (n = 91) at a nearby location, were examined by two investigators. 14% of the study population and 21% of the control group were found to have skin disorders. Most were complaints that are commonly encountered in general medical practice. There was a striking absence of skin infestations. The historical consultation rate for skin disorders had not increased. It was concluded that an outbreak of skin disease had not occurred in British troops guarding the dam. This epidemiological study shows that, even under conditions of modern field hygiene, up to one in five soldiers will have skin disease. Skin infestations, however, have become progressively less common during military campaigns this century, probably because of better personal hygiene, good preventive medicine practices and better access to effective health care. PMID:8976888
Workforce Training and Economic Development Fund: 2015 Annual Progress Report
ERIC Educational Resources Information Center
Iowa Department of Education, 2015
2015-01-01
The Department of Education, Division of Community Colleges, will annually provide the State Board of Education with The Workforce Training and Economic Development (WTED) Fund Annual Progress Report. Administration and oversight responsibility for the fund was transferred from the Iowa Economic Development Authority to the Iowa Department of…
Ghosh, Mrinal K.; Muller, H. Konrad
2017-01-01
We have previously demonstrated lactational transfer of T cell–based immunity from dam to foster pup. In the short term, a significant part of transferred immunity is passive cellular immunity. However, as time progresses, this is replaced by what we have described as maternal educational immunity such that by young adulthood, all immune cells responding to a foster dam immunogen are the product of the foster pup’s thymus. To reduce confounding factors, this original demonstration used congenic/syngeneic dam and foster pup pairs. In this study, we investigated lactational transfer of immunity to Mycobacterium tuberculosis in MHC class I–mismatched animals, as well as from Th1-biased dams to Th2-biased foster pups. Using immunized C57BL/6J dams, lactational transfer to nonimmunized BALB/cJ foster pups resulted in much greater immunity than direct immunization in 5-wk-old pups (ex vivo assay of pup splenocytes). At this age, 82% of immunogen-responding cells in the pup spleen were produced through maternal educational immunity. FVB/NJ nonimmunized foster recipients had a greater number of maternal cells in the spleen and thymus but a much larger percentage was Foxp3+, resulting in equivalent immunity to direct immunization. Depletion of maternal Foxp3+ cells from pup splenocytes illustrated a substantial role for lactationally transferred dam regulatory T cells in suppression of the ex vivo response in FVB/NJ, but not BALB/cJ, recipients. We conclude that lactational transfer of immunity can cross MHC class I barriers and that Th1 immunity can be imparted to Th2-biased offspring; in some instances, it can be greater than that achieved by direct immunization. PMID:28747348
Nestler, John M.; Milhouse, Robert T.; Troxel, Jay; Fritschen, Janet A.
1985-01-01
In 1974 county governments in the Atlanta vicinity realized that demands on the Chattahoochee River for water supply plus the streamflow required for water quality nearly equaled the minimum flow in the river. Increased demands for water supply in the following years could not be supplied under the then existing flow regime in the river. In response to the anticipated shortage of water, the Atlanta Regional Commission, a multicounty agency responsible for comprehensive regional planning in the Atlanta region, was contracted to prepare water demand projections to the year 2010 and identify alternatives for meeting projected water demands. The results of this study are published in an extensive final report, the Metropolitan Atlanta Area Water Resources Management Study (1981). Requests for copies should be directed to the District Engineer, Savannah District. Many of the identified alternatives to increase future water supply for the Atlanta area would result in modifications to the present flow regime within the Chattahoochee River between Buford Dam (river mile 348.3) and its confluence with Peachtree Creek (river mile 300.5). The present preferred alternative is construction of a reregulation dam at about river mile 342. The proposed reregulation dam would release a much more constant flow than the peaking flows presently released from Buford Dam (generally, a maximum release of approximately 9000 cfs or minimum release of about 550 cfs) by storing the generation releases from Buford Dam for gradual release during non-generation periods. The anticipated minimum release from the rereg dam would he approximately 1U5U cfs (based on contractual obligations to the Southeast Power Administration to supply a minimum of 11 hours of peaking power per week from Buford Dam). The average annual release from the proposed reregulation dam into the Chattahoochee River would be approximately 2000 cfs (based on USGS flow records) and the median release would he approximately 1500 cfs (value obtained from Savannah District). The proposed reregulation dam would have sufficient storage to provide some opportunity for flow management to optimize uses other than water supply and water quality. Flow modifications (and resultant water quality changes) within this reach of the Chattahoochee River to meet increased demands for water supply may have an effect on other beneficial uses of this important natural resource. In addition to supplying a significant proportion of the water supply for metropolitan Atlanta and providing for water quality, the Chattahoochee River also is used extensively for recreation and supports a valuable trout fishery. Altered flows in the channel to meet water supply needs may have an impact on river recreation and trout habitat.
Guided-Wave Testing of Trunnion Rods at Greenup Lock and Dam, Kentucky
2014-04-01
fatigue cracks which go through opening and closing periods during their progression, microcracks in post-tension trunnion anchor rods are believed to be...produce undesired interference effects. A new 1.5 in. diameter, medium-damped lead zirconate titanate ( PZT ), ceramic-based crystal (i.e., an Accuscan
Power-poor nation taps jungle river for energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-13
The Paute River 1,690-MW hydroelectric power project near Cuenca will triple the power generating capacity of Ecuador. Progress on this practically inaccessible site is reported. The centerpiece will be the 560-ft-high Amaluza Dam. The underground powerhouse is slated to come on line in 1982.
Annual Report on U.S. Army Civil Works Activities, Fiscal Year 1954, Vol. 1
1954-12-10
Reservoir, Tex ______ 1948 July 1953 ___________ Reservoir. Pine Bluff, Ark ____________ 1953 April 1954 __________ Local protection. During the year...Perry County Drainage and Levee Districts, Nos. 1, 2, and 3, Mo. Pine Flat Reservoir, Calif_ ______________ _ Red River Levees and Bank...conduits at Pine Flat Dam from the 15 originally considered to 10, with a saving of $500,000 in construction cost. Comparable savings will be made on
15. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
15. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1927. Vol. I, Narrative and Photographs, District #4, RG 75, Entry 655, BOx 29, National Archives, Washington, DC.) Photographer unknown. PIMA LATERAL, MCCLELLAN WASH CONDUIT, LOOKING SOUTH-WEST, 4/16/27 - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ
Annual glacier dammed lake drainage in Zackenberg, Northeast Greenland
NASA Astrophysics Data System (ADS)
Lane, Timothy; Adamson, Kathryn; Matthews, Tom
2016-04-01
A.P. Olsen is a 295 km2 ice cap in the Zackenberg region of Northeast Greenland (74.6° N, 21.5° W), 35 km from the ZERO Zackenberg Research Station. The ice cap lies on a gneissic plateau, covering an elevation of 200 to 1450 m a.s.l. A.P. Olsen mass balance has been monitored since 2008 and reconstructed for the period 1995-2007. Meltwater from this ice cap drains into the Zackenberg River, and into Young Sund via the Zackenberg Delta. One outlet dams a c. 0.8 km2 lake fed by the northern part of the ice cap. Observational data suggests this lake drains annually, flooding subglacially into the Zackenberg River. But the impacts of these flood events on the hydrology, sediment transfer, and geomorphology of the proglacial zone downstream have not been examined in detail. Understanding the impacts of glacial lake outburst flood events is important in the sensitive Arctic environment, where glacial change is rapid. We use Landsat scenes to reconstruct lake extent from 1999-2015. This is compared to Zackenberg River discharge measurements, available from the ZERO Zackenberg monitoring programme. These datasets are used to examine the nature and timing of flood events, and assess the impacts on the Zackenberg river downstream.
Formation and evolution of valley-bottom and channel features, Lower Deschutes River, Oregon
Curran, Janet H.; O'Conner, Jim E.; O'Conner, Jim E.; Grant, Gordon E.
2003-01-01
Primary geologic and geomorphic processes that formed valley-bottom and channel features downstream from the Pelton-Round Butte dam complex are inferred from a canyon-long analysis of feature morphology, composition, location, and spatial distribution. Major controls on valley-bottom morphology are regional tectonics, large landslides, and outsized floods (floods with return periods greater than 1000 yrs), which include the late Holocene Outhouse Flood and several Quaternary landslide dam failures. Floods with a return period on the order of 100 yrs, including historical floods in 1996, 1964, and 1861, contribute to fan building and flood plain formation only within the resistant framework established by the major controls. Key processes in the formation of channel features, in particular the 153 islands and 23 large rapids, include long-term bedrock erosion, outsized floods, and century-scale floods. Historical analysis of channel conditions since 1911 indicates that the largest islands, which are cored by outsized-flood deposits, locally control channel location, although their margins are substantially modified during annual- to century-scale floods. Islands cored by bedrock have changed little. Islands formed by annual- to century-scale floods are more susceptible to dynamic interactions between tributary sediment inputs, mainstem flow hydraulics, and perhaps riparian vegetation. Temporal patterns of island change in response to the sequence of 20th century flooding indicate that many islands accreted sediment during annual- to decadal-scale floods, but eroded during larger century-scale floods. There is, however, no clear trend of long-term changes in patterns of island growth, movement, or erosion either spatially or temporally within the lower Deschutes River.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawkes, Lynette A.
1991-03-01
The seaward migration of salmonid smolts was monitored by the National Marine Fisheries Service (NMFS) at three sites on the Columbia River system in 1990. This project is a part of the continuing Smolt Monitoring Program to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Indian Tribes. It's purpose is to provide timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis for travel time, relative magnitude and timing and the smolt migration. This program is carriedmore » out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the Smolt Monitoring program, and the Dallas Dam under the Fish Spill Memorandum of Agreement'' for 1990. All pertinent fish capture, condition and brand data, as well as dam operations and river flow data were reported daily to FPC. These data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 10 refs., 8 figs., 1 tab.« less
Korman, Josh; Martell, Steven J.D.; Walters, Carl J.; Makinster, Andrew S.; Coggins, Lewis G.; Yard, Michael D.; Persons, William R.
2012-01-01
We used an integrated assessment model to examine effects of flow from Glen Canyon Dam, Arizona, USA, on recruitment of nonnative rainbow trout (Oncorhynchus mykiss) in the Colorado River and to estimate downstream migration from Glen Canyon to Marble Canyon, a reach used by endangered native fish. Over a 20-year period, recruitment of rainbow trout in Glen Canyon increased with the annual flow volume and when hourly flow variation was reduced and after two of three controlled floods. The model predicted that approximately 16 000 trout·year–1 emigrated to Marble Canyon and that the majority of trout in this reach originate from Glen Canyon. For most models that were examined, over 70% of the variation in emigration rates was explained by variation in recruitment in Glen Canyon, suggesting that flow from the dam controls in large part the extent of potential negative interactions between rainbow trout and native fish. Controlled floods and steadier flows, which were originally aimed at partially restoring conditions before the dam (greater native fish abundance and larger sand bars), appear to have been more beneficial to nonnative rainbow trout than to native fish.
Colorado River fish monitoring in Grand Canyon, Arizona; 2000 to 2009 summary
Makinster, Andrew S.; Persons, William R.; Avery, Luke A.; Bunch, Aaron J.
2010-01-01
Long-term fish monitoring in the Colorado River below Glen Canyon Dam is an essential component of the Glen Canyon Dam Adaptive Management Program (GCDAMP). The GCDAMP is a federally authorized initiative to ensure that the primary mandate of the Grand Canyon Protection Act of 1992 to protect resources downstream from Glen Canyon Dam is met. The U.S. Geological Survey's Grand Canyon Monitoring and Research Center is responsible for the program's long-term fish monitoring, which is implemented in cooperation with the Arizona Game and Fish Department, U.S. Fish and Wildlife Service, SWCA Environmental Consultants, and others. Electrofishing and tagging protocols have been developed and implemented for standardized annual monitoring of Colorado River fishes since 2000. In 2009, sampling occurred throughout the river between Lees Ferry and Lake Mead for 38 nights over two trips. During the two trips, scientists captured 6,826 fish representing 11 species. Based on catch-per-unit-effort, salmonids (for example, rainbow trout (Oncorhynchus mykiss) and brown trout (Salmo trutta)) increased eightfold between 2006 and 2009. Flannelmouth sucker (Catostomus latipinnis) catch rates were twice as high in 2009 as in 2006. Humpback chub (Gila cypha) catches were low throughout the 10-year sampling period.
Ellsworth, Craig M.; Martin, Barbara A.
2012-01-01
Data presented in this report is a continuation of a research project that began in 2004. Larval drift parameters measured in 2009 and 2010 were similar to those measured from 2004 to 2008. Most larvae and eggs were collected at the two drift sites downstream of the former Chiloquin Dam (river kilometer 0.7 on the Sprague River and river kilometer 7.4 on the Williamson River). Mean and peak sample densities increased with proximity to Upper Klamath Lake. Peak larval densities continued to be collected between 1 and 3 hours after sunset at Chiloquin, which is the drift site nearest a known spawning area. Catch distribution of larvae and eggs in the lower Sprague and Williamson Rivers suggests that most SNS and LRS spawning continues to occur downstream of the site of the former Chiloquin Dam. The sizes and growth stages indicate that larval emigration from spawning areas resulting from drift occurs within a few days after swim-up. Larval suckers appear to move downstream quickly until they reach suitable rearing habitat.
Quantifying the impact of the Three Gorges Dam on the thermal dynamics of the Yangtze River
NASA Astrophysics Data System (ADS)
Cai, Huayang; Piccolroaz, Sebastiano; Huang, Jingzheng; Liu, Zhiyong; Liu, Feng; Toffolon, Marco
2018-05-01
This study examines the impact of the world’s largest dam, the Three Gorges Dam (TGD), on the thermal dynamics of the Yangtze River (China). The analysis uses long-term observations of river water temperature (RWT) in four stations and reconstructs the RWT that would have occurred in absence of the TGD. Relative to pre-TGD conditions, RWT consistently warmed in the region due to air temperature (AT) increase. In addition, the analysis demonstrates that the TGD significantly affected RWT in the downstream reach. At the closest downstream station (Yichang) to the TGD, the annual cycle of RWT experienced a damped response to AT and a marked seasonal alteration: warming during all seasons except for spring and early summer which were characterized by cooling. Both effects were a direct consequence of the larger thermal inertia of the massive water volume stored in the TGD reservoir, causing the downstream reach to be more thermally resilient. The approach used here to quantify the separate contributions of climate and human interventions on RWT can be used to set scientific guidelines for river management and conservation planning strategies.
NASA Astrophysics Data System (ADS)
Stillman, David E.; Michaels, Timothy I.; Grimm, Robert E.; Hanley, Jennifer
2016-02-01
Recurring slope lineae (RSL) are narrow (0.5-5 m) dark features on Mars that incrementally lengthen down steep slopes, fade in colder seasons, and recur annually. These features have been identified from the northern to southern mid-latitudes. Here, we describe how observations of northern mid-latitude RSL in northern Chryse Planitia and southwestern Acidalia Planitia (CAP) suggest that brines start flowing before northern spring equinox and continue for more than half a Mars-year (490 ± 40 sols, spanning solar longitude 337° ± 11°-224° ± 20°). All CAP RSL are found on the steep slopes of craters and their source zones are at or below the elevation of the surrounding plains. Spacecraft-derived surface temperature observations cannot resolve individual RSL, so thermal modeling was used to determine that CAP RSL have a freezing temperature of 238-252 K, freeze and melt diurnally, and flow only occurs within the top ∼8 cm of the regolith. Furthermore, we calculate that a typical CAP RSL has a water budget of 1.5-5.6 m3/m of headwall. Therefore, such a large water budget makes annual recharge via atmospheric or subsurface diffusion sources unlikely. Alternatively, we hypothesize that the most plausible RSL source is a briny aquifer with a freezing temperature less than or equal to the mean annual CAP surface temperature (220-225 K). The annual cycle is as follows: in late autumn, the shallowest part of the brine feeding the source zone freezes, forming an ice dam. As spring approaches, temperatures rise and the dam is breached. Brine is discharged and the RSL initially lengthens rapidly (>1.86 m/sol), the lengthening rate then slows considerably, to ∼0.25 m/sol. Eventually, the losses equal the discharge rate and the RSL reaches its equilibrium phase. As brine flows in the RSL some of the water is lost to the atmosphere, therefore the freezing temperature of the brine within the RSL is higher (238-252 K) as the brine transitions to a super-eutectic salt concentration. In the late autumn, falling temperatures restore the ice dam and the H2O in the RSL slowly sublimates away. Overall, CAP RSL possess a significantly different seasonality and much longer duration than typical southern mid-latitude RSL, suggesting that RSL at different latitude bands have different source types. Lastly, CAP RSL are the best evidence that shallow groundwater may still exist on Mars.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iwamoto, Robert N.; Sandford, Benjamin P.; McIntyre, Kenneth W.
1994-04-01
A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at differentmore » areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers.« less
Space and habitat use by black bears in the Elwha valley prior to dam removal
Sager-Fradkin, K.A.; Jenkins, K.J.; Happe, P.J.; Beecham, J.J.; Wright, R.G.; Hoffman, R.A.
2008-01-01
Dam removal and subsequent restoration of salmon to the Elwha River is expected to cause a shift in nutrient dynamics within the watershed. To document how this influx of nutrients and energy may affect black bear (Ursus americanus) ecology, we used radio-telemetry to record movements of 11 male and two female black bears in the Elwha Valley from 2002-06. Our objective was to collect baseline data on bear movements prior to dam removal. We calculated annual home ranges, described seasonal timing of den entry and emergence, and described seasonal patterns of distribution and habitat use. Adaptive kernel home ranges were larger formales (mean = 151.1 km2, SE = 21.4) than females (mean = 38.8 km2, SE = 13.0). Males ranged widely and frequently left the watershed during late summer. Further, they exhibited predictable and synchronous patterns of elevation change throughout each year. Bears entered their winter dens between 8 October and 15 December and emerged from dens between 10 March and 9 May. Male bears used low-elevation conifer and hardwood forests along the Elwha floodplain during spring, mid- to high-elevation forests and meadows during early summer, high-elevation forests, meadows and shrubs during late summer, and mid-elevation forests, shrubs and meadows during fall. Data acquired during this study provide important baseline information for comparison after dam removal, when bears may alter their late summer and fall movement and denning patterns to take advantage of energy-rich spawning salmon.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitney, Richard; Berger, Matthew; Tonasket, Patrick
2006-12-01
The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colvillemore » Tribes Mitigation Project during the 2006 contract period.« less
NASA Astrophysics Data System (ADS)
Geissman, J. W.
2002-12-01
At and near Hoover Dam, southeast of Las Vegas, Cenozoic left-slip offset along the NE-SW trending Lake Mead fault system (LMFS) has resulted in the apparent rotation of structures and total displacement of up to 65 km. Defining any rotation of blocks within and near the LMFS is critical to assessing the kinematics of strike-slip faulting and attending extension. Paleomagnetic data from Miocene volcanic and some sedimentary rocks and intrusions (over 160 sites) deposited on Precambrian basement show that part of the Hoover Dam locality has experienced counterclockwise rotation . The middle Miocene (ca. 14.2 Ma)Tuff of Hoover Dam (THD)(sampled at over 90 sites) yields a well-grouped characteristic magnetization (ChRM); about 5 km south and east of the dam, gently east-dipping, north-striking rocks of the THD yield a corrected ChRM of moderate positive inclination and northwest declination (D=324.8°, I=27.4°, a95=10.7°, k=24, N=9 sites). Structural corrections, based on compaction fabrics in the THD are consistent with stratigraphic contacts. The anomalous shallow inclination for the THD ChRM implies that it was emplaced over a short period of time during a field instability. contact and conglomerate test results are interpreted to show that the THD ChRM is primary. Corrected data from north and west of the dam (D=289.7°, I=30.2°,a95=8.6°,k=32, N=10) are interpreted to indicate about 35° of counterclockwise rotation (R= -35.1°, delR= 12.4, F= -2.8°, delF = 10.8, relative to data from south of the dam) of crust across the dam site, consistent with progressive changes in strike of tilted fault blocks. The transition from apparently unrotated crust to rotated crust occurs over a zone about 1 km wide, where blocks of THD and older strata have been tilted up to 50°, probably concurrent with rotation. Rotation of crust northwest of Hoover Dam may reflect differential extension northwest of the LMFS (e.g.,River Mountains area) as strain is partitioned into west to southwest-dipping normal faults on either side of the LMFS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2000. This was the fifth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 397,339 yearlings released from the Fall Chinook Acclimation Projectmore » facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,477 PIT tagged yearlings from Pittsburg Landing, 7,421 from Big Canyon and 2,488 from Captain John Rapids. The Washington Department of Fish and Wildlife released 980 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 157.7 mm (157.3-158.1 mm) at Big Canyon to 172.9 mm (172.2-173.6 mm) at Captain John Rapids. Mean condition factors ranged from 1.06 at Captain John Rapids and Lyons Ferry Hatchery to 1.12 at Big Canyon. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.0% (84.7-89.4%) for Pittsburg Landing to 95.2% (91.5-98.9%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 65.8% (58.5-73.1%) for Lyons Ferry Hatchery to 84.0% (76.2-91.8%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 10.1 river kilometers per day (rkm/d) for Captain John Rapids to 19.1 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 6.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 9-10 days to Lower Granite Dam and 22-25 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 21-22. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 5-6. The median arrival date at McNary Dam was April 24 for Lyons Ferry Hatchery yearlings.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1999. This was the fourth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 453,117 yearlings released from the Fall Chinook Acclimationmore » Project facilities not only slightly exceeded the 450,000 fish quota, but a second release of 76,386 yearlings (hereafter called Surplus) were acclimated at the Big Canyon facility and released about two weeks after the primary releases. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 9,941 PIT tagged yearlings from Pittsburg Landing, 9,583 from Big Canyon, 2,511 Big Canyon Surplus and 2,494 from Captain John Rapids. The Washington Department of Fish and Wildlife released 983 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low and did not appear to increase after transport to the acclimation facilities. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Pittsburg Landing and Lyons Ferry Hatchery and relatively high at Big Canyon and Captain John Rapids. Mean fork lengths (95% confidence interval) of the release groups ranged from 147.4 mm (146.7-148.1 mm) at Captain John Rapids to 163.7 mm (163.3-164.1 mm) at Pittsburg Landing. Mean condition factors ranged from 1.04 at Pittsburg Landing to 1.23 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.8% (82.1-93.4%) for Big Canyon Surplus to 94.1% (90.1-98.1%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 58.7% (49.3-68.1%) for Big Canyon Surplus to 71.3% (60.1-82.5%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 9.3 river kilometers per day (rkm/d) for Captain John Rapids to 18.7 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 9.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 7-10 days to Lower Granite Dam and 21-23 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from the FCAP facilities, were all from April 23-25. The median arrival date for Big Canyon Surplus was May 4. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 7-8. Median arrival dates at McNary Dam were May 17 for Big Canyon Surplus and April 26 for Lyons Ferry Hatchery.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocklage, Stephen J.; Kellar, Dale S.
2005-07-01
The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 2001. This was the sixth year of a long-term project to supplement natural spawning populations of Snake River stock fall Chinook salmon upstream of Lower Granite Dam. The 318,932 yearlings released from the Fall Chinook Acclimation Projectmore » facilities were short of the 450,000 fish quota. We use Passive Integrated Transponder (PIT) tag technology to monitor the primary performance measures of survival to mainstem dams and migration timing. We also monitor size, condition and tag/mark retention at release. We released 7,503 PIT tagged yearlings from Pittsburg Landing, 7,499 from Big Canyon and 2,518 from Captain John Rapids. The Washington Department of Fish and Wildlife released 991 PIT tagged yearlings from Lyons Ferry Hatchery. Fish health sampling indicated that, overall, bacterial kidney disease levels could be considered relatively low. Compared to prior years, Quantitative Health Assessment Indices were relatively low at Big Canyon and Captain John Rapids and about average at Pittsburg Landing and Lyons Ferry Hatchery. Mean fork lengths (95% confidence interval) of the PIT tagged groups ranged from 155.4 mm (154.7-156.1 mm) at Captain John Rapids to 171.6 mm (170.7-172.5 mm) at Lyons Ferry Hatchery. Mean condition factors ranged from 1.02 at Lyons Ferry Hatchery to 1.16 at Big Canyon and Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 74.4% (73.2-75.5%) for Big Canyon to 85.2% (83.5-87.0%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 37.9% (36.0-40.0%) for Pittsburg Landing to 57.9% (53.0-62.8%) for Lyons Ferry Hatchery. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 6.3 river kilometers per day (rkm/d) for Big Canyon to 10.8 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 5.2 rkm/d for Lyons Ferry Hatchery to 10.9 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 13-17 days to Lower Granite Dam and 31-37 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 26-27. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 14-18. The median arrival date at McNary Dam was May 13 for Lyons Ferry Hatchery yearlings.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johasson, Brian C.; Tranquilli, J. Vincent; Keefe, MaryLouise
1998-10-28
We have documented two general life history strategies utilized by juvenile spring chinook salmon in the Grande Ronde River basin: (1) juveniles migrate downstream out of summer rearing areas in the fall, overwinter in river valley habitats, and begin their seaward migration in the spring, and (2) juveniles remain in summer rearing areas through the winter and begin seaward migration in the spring. In migration year 96-97, the patterns evident from migrant trap data were similar for the three Grande Ronde River populations studied, with 42% of the Lostine River migrants and 76% of the Catherine Creek migrants leaving uppermore » rearing areas in the fall. Contrary to past years, the majority (98%) of upper Grande Ronde River migrants moved out in the fall. Total trap catch for the upper Grande Ronde River was exceedingly low (29 salmon), indicating that patterns seen this year may be equivocal. As in previous years, approximately 99% of chinook salmon juveniles moved past our trap at the lower end of the Grande Ronde River valley in the spring, reiterating that juvenile chinook salmon overwinter within the Grande Ronde valley section of the river. PIT-tagged fish were recaptured at Grande Ronde River traps and mainstem dams. Recapture data showed that fish that overwintered in valley habitats left as smolts and arrived at Lower Granite Dam earlier than fish that overwintered in upstream rearing areas. Fish from Catherine Creek that overwintered in valley habitats were recaptured at the dams at a higher rate than fish that overwintered upstream. In this first year of data for the Lostine River, fish tagged during the fall migration were detected at a similar rate to fish that overwintered upstream. Abundance estimates for migration year 96-97 were 70 for the upper Grande Ronde River, 4,316 for the Catherine Creek, and 4,323 for the Lostine River populations. Although present in most habitats, juvenile spring chinook salmon were found in the greatest abundance in pool habitats, particularly alcove and backwater pools. These results were consistent for both summer and winter surveys.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ward, David L.
1994-06-01
Results of the second year are reported of a basinwide program to harvest northern squawfish in an effort to reduce mortality due to squawfish predation on juvenile salmonids during their migration from natal streams to the ocean. Six papers are included in this report. They are entitled: feasibility investigation of a commercial longline fishery for northern squawfish in the Columbia River downstream from Bonneville dam; evaluation of the northern squawfish sport-reward fishery in the Columbia and Snake Rivers; controlled angling for northern squawfish at selected dams on the Columbia and Snake Rivers in 1992; evaluation of harvest technology for squawfishmore » control in Columbia River reservoirs; effectiveness of predator-removal for protecting juvenile fall chinook salmon released from Bonneville Hatchery; and Northern squawfish sport-reward payments.« less
NASA Astrophysics Data System (ADS)
Flessa, Karl; Dettman, David; Cintra-Buenrostro, Carlos; Rowell, Kirsten
2016-04-01
In most years since 1960, the Colorado River has not reached the sea. Upstream dams and diversions in the U.S.A. and Mexico have diverted the river's water for agricultural and municipal use. The river's estuary in the upper Gulf of California, in Mexico, once supported very large populations of Mulinia coloradoensis, a trophically important bivalve mollusk, and Totoaba macdonaldi, a now-endangered scianid fish,. Because Colorado River water is isotopically distinct from Gulf of California seawater, we used the δ18O composition of the pre-dam bivalve shells and fish otoliths to estimate past salinities and river flows. We estimate that five to ten percent of the river's annual flow would be needed to restore M. coloradoensis habitat in the river's mouth and to restore the nursery grounds of T. macdonaldi. The dead can speak to the living.
12. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
12. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. PIMA LATERAL, LINING EQUIPMENT, 5/13/25 - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ
14. Photographic copy of photograph. (Source: U.s. Department of Interior. ...
14. Photographic copy of photograph. (Source: U.s. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1927. Vol. I, Narrative and Photographs, District #4, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. PIMA LATERAL, MCCLELLAN CONDUIT, ENTRANCE BEFORE POURING THE CONDUIT, 4/30/27 - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ
FY2011 Annual Progress Report for Propulsion Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Patrick B.; Schutte, Carol L.; Gibbs, Jerry L.
Annual Progress Report for Propulsion Materials focusing on enabling and innovative materials technologies that are critical in improving the efficiency of advanced engines by providing enabling materials support for combustion, hybrid, and power electronics development.
NASA Astrophysics Data System (ADS)
Majerova, M.; Neilson, B. T.; Schmadel, N. M.; Wheaton, J. M.; Snow, C. J.
2013-12-01
Beaver dams and beaver activity affect hydrologic processes, sediment transport, channel complexity and water quality of streams. Beaver ponds, which form behind beaver dams, increase in-channel water storage affecting the timing and volume of flow and resulting in the attenuation and flattening of the hydrograph. Channel complexity also increases the potential for transient storage (both surface and subsurface) and influences stream temperature. Impacts of beaver dams and beaver activity on stream responses are difficult to quantify because responses are dynamic and spatially variable. Few studies have focused on the reach scale temporal influences on stream responses and further research is needed particularly in quantifying the influence of beaver dams and their role in shaping the stream habitat. This study explores the changing hydrology and temperature regime of Curtis Creek, a mountainous stream located in Northern Utah, in a 560 m long reach where groundwater exchanges and temperature differences were observed over a three-year period. We have collected continuous stream discharge, stream temperature data and performed tracer experiments. During the first year, we were able to capture the pre-beaver activity. In the second year, we captured the impacts of some beaver activity with only a few dams built in the reach, while the third year included the effects of an entire active beaver colony. By the end of the study period, a single thread channel had been transformed into a channel with side channels and backwaters at multiple locations therefore increasing channel complexity. The cumulative influence of beaver dams on reach scale discharge resulted in a slightly losing reach that developed into a gaining reach. At the smaller sub-reach scale, both losing to gaining and gaining to losing transformations were observed. Temperature differences showed a warming effect of beaver dams at the reach scale. The reach stream temperature difference increased on average 0.3°C when comparing the first to the third year of our study period. This warming trend was more pronounced in summer stream temperatures where differences were about 0.7°C. During winter months cooling was observed and temperatures decreased about -0.2°C over the reach. Annual tracer studies also captured an 81min (238%) increase in residence times due primarily to the increased channel complexity and storage over the three-year period. Our study provides reach scale understanding regarding the temporal influence of beavers to not only change physical template of the channel, but also influence the hydrology and temperature regime of streams.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copeland, Timothy; Johnson, June; Putnam, Scott
2008-12-01
Populations of anadromous salmonids in the Snake River basin declined precipitously following the construction of hydroelectric dams in the Snake and Columbia rivers. Raymond (1988) documented a decrease in survival of emigrating steelhead trout Oncorhynchus mykiss and Chinook salmon O. tshawytscha from the Snake River following the construction of dams on the lower Snake River during the late 1960s and early 1970s. Although Raymond documented some improvements in survival through the early 1980s, anadromous populations remained depressed and declined even further during the 1990s (Petrosky et al. 2001; Good et al. 2005). The effect was disastrous for all anadromous salmonidmore » species in the Snake River basin. Coho salmon O. kisutch were extirpated from the Snake River by 1986. Sockeye salmon O. nerka almost disappeared from the system and were declared under extreme risk of extinction by authority of the Endangered Species Act (ESA) in 1991. Chinook salmon were classified as threatened with extinction in 1992. Steelhead trout were also classified as threatened in 1997. Federal management agencies in the basin are required to mitigate for hydroelectric impacts and provide for recovery of all ESA-listed populations. In addition, the Idaho Department of Fish and Game (IDFG) has the long-term goal of preserving naturally reproducing salmon and steelhead populations and recovering them to levels that will provide a sustainable harvest (IDFG 2007). Management to achieve these goals requires an understanding of how salmonid populations function (McElhany et al. 2000) as well as regular status assessments. Key demographic parameters, such as population density, age composition, recruits per spawner, and survival rates must be estimated annually to make such assessments. These data will guide efforts to meet mitigation and recovery goals. The Idaho Natural Production Monitoring and Evaluation Project (INPMEP) was developed to provide this information to managers. The Snake River stocks of steelhead and spring/summer Chinook salmon still have significant natural reproduction and thus are the focal species for this project's investigations. The overall goal is to monitor the abundance, productivity, distribution, and stock-specific life history characteristics of naturally produced steelhead trout and Chinook salmon in Idaho (IDFG 2007). We have grouped project tasks into three objectives, as defined in our latest project proposal and most recent statement of work. The purpose of each objective involves enumerating or describing individuals within the various life stages of Snake River anadromous salmonids. By understanding the transitions between life stages and associated controlling factors, we hope to achieve a mechanistic understanding of stock-specific population dynamics. This understanding will improve mitigation and recovery efforts. Objective 1. Measure 2007 adult escapement and describe the age structure of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam. Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. Objective 3. Evaluate life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. In this annual progress report, we present technical results for work done during 2007. Part 2 contains detailed results of INPMEP aging research and estimation of smolt-to-adult return rates for wild and naturally produced Chinook salmon (Objectives 1 and 3). Part 3 is a report on the ongoing development of a stock-recruit model for the freshwater phase of spring/summer Chinook salmon in the Snake River basin (Objective 3). Part 4 is a summary of the parr density data (Objective 2) collected in 2007 using the new site selection procedure. Data are maintained in computer databases housed at the IDFG Nampa Fisheries Research office (described in the Appendix) and are available from the first author. Other project accomplishments during 2007 (e.g., professional presentations) are also summarized in the Appendix.« less
Kui, Li; Stella, John C.; Shafroth, Patrick B.; House, P. Kyle; Wilcox, Andrew C.
2017-01-01
On alluvial rivers, fluvial landforms and riparian vegetation communities codevelop as a result of feedbacks between plants and abiotic processes. The influence of vegetation on river channel and floodplain geomorphology can be particularly strong on dammed rivers with altered hydrology and reduced flood disturbance. We used a 56-year series of aerial photos on the dammed Bill Williams River (Arizona, USA) to investigate how (a) different woody riparian vegetation types influence river channel planform and (b) how different fluvial landforms drive the composition of riparian plant communities over time. We mapped vegetation types and geomorphic surfaces and quantified how relations between fluvial and biotic processes covaried over time using linear mixed models. In the decades after the dam was built, woody plant cover within the river's bottomland nearly doubled, narrowing the active channel by 60% and transforming its planform from wide and braided to a single thread and more sinuous channel. Compared with native cottonwood–willow vegetation, nonnative tamarisk locally induced a twofold greater reduction in channel braiding. Vegetation expanded at different rates depending on the type of landform, with tamarisk cover on former high-flow channels increasing 17% faster than cottonwood–willow. Former low-flow channels with frequent inundation supported a greater increase in cottonwood–willow relative to tamarisk. These findings give insight into how feedbacks between abiotic and biotic processes in river channels accelerate and fortify changes triggered by dam construction, creating river systems increasingly distinct from predam ecological communities and landforms, and progressively more resistant to restoration of predam forms and processes.
Full implementation of a distributed hydrological model based on check dam trapped sediment volumes
NASA Astrophysics Data System (ADS)
Bussi, Gianbattista; Francés, Félix
2014-05-01
Lack of hydrometeorological data is one of the most compelling limitations to the implementation of distributed environmental models. Mediterranean catchments, in particular, are characterised by high spatial variability of meteorological phenomena and soil characteristics, which may prevents from transferring model calibrations from a fully gauged catchment to a totally o partially ungauged one. For this reason, new sources of data are required in order to extend the use of distributed models to non-monitored or low-monitored areas. An important source of information regarding the hydrological and sediment cycle is represented by sediment deposits accumulated at the bottom of reservoirs. Since the 60s, reservoir sedimentation volumes were used as proxy data for the estimation of inter-annual total sediment yield rates, or, in more recent years, as a reference measure of the sediment transport for sediment model calibration and validation. Nevertheless, the possibility of using such data for constraining the calibration of a hydrological model has not been exhaustively investigated so far. In this study, the use of nine check dam reservoir sedimentation volumes for hydrological and sedimentological model calibration and spatio-temporal validation was examined. Check dams are common structures in Mediterranean areas, and are a potential source of spatially distributed information regarding both hydrological and sediment cycle. In this case-study, the TETIS hydrological and sediment model was implemented in a medium-size Mediterranean catchment (Rambla del Poyo, Spain) by taking advantage of sediment deposits accumulated behind the check dams located in the catchment headwaters. Reservoir trap efficiency was taken into account by coupling the TETIS model with a pond trap efficiency model. The model was calibrated by adjusting some of its parameters in order to reproduce the total sediment volume accumulated behind a check dam. Then, the model was spatially validated by obtaining the simulated sedimentation volume at the other eight check dams and comparing it to the observed sedimentation volumes. Lastly, the simulated water discharge at the catchment outlet was compared with observed water discharge records in order to check the hydrological sub-model behaviour. Model results provided highly valuable information concerning the spatial distribution of soil erosion and sediment transport. Spatial validation of the sediment sub-model provided very good results at seven check dams out of nine. This study shows that check dams can be a useful tool also for constraining hydrological model calibration, as model results agree with water discharge observations. In fact, the hydrological model validation at a downstream water flow gauge obtained a Nash-Sutcliffe efficiency of 0.8. This technique is applicable to all catchments with presence of check dams, and only requires rainfall and temperature data and soil characteristics maps.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Farinosi, F.; Lee, E.; Livino, A.; Moorcroft, P. R.
2016-12-01
Brazil is the 2nd largest hydropower producer in the world, and this energy source will continue to be a priority in the country for the foreseeable decades. Yet, climate change is expected to alter the country's hydrological regime, in particular in the Amazon where most new hydropower development is occurring. In order to better assess the potential of hydropower projects in decades to come, it is important to evaluate how future hydrological regimes will affect their performance and suitability. This study quantifies the impacts of climate change and land use conversion on hydropower generation, and identifies mechanisms that could help energy planners to account for future changes. Using the largest network of dams in Brazil's national portfolio within a single watershed, the Tapaj's River, this study connects global and regional future environmental projections to daily river flows and operations of 37 dams with an overall potential capacity of 29.4 GW. We found that climate change could decrease hydropower potential by 477-665 MW (-6 to -8% from historical conditions) during the dry season, a critical loss since dams are expected to operate at only one third of capacity during this perioddue to the limited reservoir volume of most projects in the Amazon lowlands. Furthermore, deforestation is expected to increase the inter-annual variability in hydropower potential from 2,798 for baseline conditions to 3,764-3,899 (+967-1102) MW under future scenarios for the 2040s. Consideration of future hydrological conditions on individual dams showed that the magnitude and uncertainty of losses could be greater than 30 MW -equivalent to the total potential of some dams in the inventory- in 11 of the projects studied. Future hydrological conditions could also delay the period when maximum daily generation occurs by 22-29 days, which could have important implications to energy planning in Brazil because these run-of-river dams would no longer be able to meet the country's seasonal peak demand. This information on future changes to individual dams' performance could feed directly into the project selection process in order to adapt designs and operations to ensure the greatest benefits and least impacts from hydropower in the long term.
Development of an Environmental Flow Framework for the McKenzie River Basin, Oregon
Risley, John; Wallick, J. Rose; Waite, Ian; Stonewall, Adam J.
2010-01-01
The McKenzie River is a tributary to the Willamette River in northwestern Oregon. The McKenzie River is approximately 90 miles in length and has a drainage area of approximately 1,300 square miles. Two major flood control dams, a hydropower dam complex, and two hydropower canals significantly alter streamflows in the river. The structures reduce the magnitude and frequency of large and small floods while increasing the annual 7-day minimum streamflows. Stream temperatures also have been altered by the dams and other anthropogenic factors, such as the removal of riparian vegetation and channel simplification. Flow releases from one of the flood control dams are cooler in the summer and warmer in the fall in comparison to unregulated flow conditions before the dam was constructed. In 2006, the Oregon Department of Environmental Quality listed a total of 112.4, 6.3, and 55.7 miles of the McKenzie River basin mainstem and tributary stream reaches as thermally impaired for salmonid rearing, salmonid spawning, and bull trout, respectively. The analyses in this report, along with previous studies, indicate that dams have altered downstream channel morphology and ecologic communities. In addition to reducing the magnitude and frequency of floods, dams have diminished sediment transport by trapping bed material. Other anthropogenic factors, such as bank stabilization, highway construction, and reductions of in-channel wood, also have contributed to the loss of riparian habitat. A comparison of aerial photography taken in 1939 and 2005 showed substantial decreases in secondary channels, gravel bars, and channel sinuosity, particularly along the lower alluvial reaches of the McKenzie River. In addition, bed armoring and incision may contribute to habitat degradation, although further study is needed to determine the extent of these processes. Peak streamflow reduction has led to vegetation colonization and stabilization of formerly active bar surfaces. The large flood control dams on Blue River and South Fork McKenzie River likely have had the greatest effect on downstream habitats because these sediment and flood-rich tributaries historically contributed a disproportionate volume of bed material, wood, and peak flows in comparison with the spring-fed tributaries of the upper McKenzie River basin. The ecological effects of the dams were examined by focusing on nine exemplar aquatic and terrestrial species, including spring Chinook salmon, bull trout, Oregon chub, Pacific and western brook lamprey, red-legged frog, western pond turtle, alder, and cottonwood. The changes caused by the dams to streamflow hydrograph affect all these and other species in complex ways, although a few commonalities are apparent. A loss of channel complexity in the McKenzie River basin, which is associated with the reduction in flood events and widespread channel stabilization, is the primary factor related to the observed population declines for all nine exemplar species. The dams also have caused direct ecological effects by blocking access to habitat, changing the amount and timing of available critical habitat, and changing water temperature during important seasons for different life stages.
Adapting to climate change or to stakeholders?
NASA Astrophysics Data System (ADS)
Bruggeman, Adriana; Camera, Corrado; Giannakis, Elias; Zoumides, Christos; Eliades, Marinos; Djuma, Hakan
2015-04-01
The Tamassos dam protects the Pedieos watershed in Cyprus against floods. The waterbody behind the dam serves as a new biodiversity and recreational resource. Water from the dam is also used for domestic water supply for nearby rural communities. However, this peaceful picture is threatened by climate change. Regional Climate Models indicate a drier and warmer Pedieos watershed in the near future (2020-2050). Interviews and meetings with a wide variety of stakeholders, for the development of a climate change adaptation plan for the Pedieos watershed, has created even more uncertainties than climate change. Environmental-minded stakeholders suggested to demolish the dam and to return the watershed to its natural state and the water to downstream ecosystems. Agricultural producers would also like to see the return of stream flows, such that they can divert or impound the water for groundwater recharge and subsequent irrigation. Community leaders similarly prefer stream flows for the recharge of the alluvial river aquifers, to allow them to abstract more groundwater for community water supply. Downstream authorities have different concerns. Here the usually dry river bed serves as the drainage of the urban agglomeration of the capital of Nicosia; and has been identified as an area of potentially significant flood risk for the European Flood Directive (2007/60/EC). The largest storm event in the upstream area in the recent past occurred in January 1989, before the construction of the dam. The runoff totalled 3.1 million m3 in one day and 4.4 million m3 in two days. Thus, part of the runoff would have flown straight through the spillway of the 2.8 million m3 dam reservoir. Average annual precipitation in the highly sloping, forested upstream area is 500 mm, while stream flows average 4.7 million m3/yr (1981-2001). This results in an average runoff coefficient of 19% for the 45-km2 upstream area. Past observations, climate change projections and hydrologic models facilitate the development of sustainable adaptation solutions. However, reconciling the diverging visions and water demands of the stakeholders will be a tougher problem to solve. This research is supported by the European Union's FP7 BEWATER project (GA 612385).
NASA Astrophysics Data System (ADS)
Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.
2014-12-01
River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular interest are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the Upper Mekong. Given their proximity to the Lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S, together with definite future (DF) plans for infrastructure development through the basin, would alter the hydrology of the Tonle Sap's Floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's DF scenario driven by the Upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30-day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm day-1. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will be exploited and that dams will be built even in locations where there is a high risk of ecological disruption. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.
2014-02-01
River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular attention are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the upper Mekong. Given their proximity to the lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S would alter the hydrology of the Tonle Sap floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's definite future development scenario (DF) driven by the upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30 day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm d-2. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will actually be exploited and that dams would be built even in locations where there is a high risk of ecological disruptions. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.
2006-10-01
Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugertmore » et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2005; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U.S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2005 was funded by the Bonneville Power Administration and Idaho Power Company.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, Aaron P.; Bradbury, S.M.; Arnsberg, Billy D.
2003-09-01
Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert etmore » al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2001; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2002 was funded by the Bonneville Power Administration (Projects 1998-01-003 and 1994-03-400) and the Idaho Power Company.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, A.P.; Bradbury, S.M.; Arnsberg, B.D.
2004-08-01
Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert etmore » al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2003; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2003 was funded by the Bonneville Power Administration (Projects 199801003, 199801004, 199403400, 198335003), Idaho Power Company, and Bureau of Land Management.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.
2005-10-01
Redd counts were used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert etmore » al. 1989-1991; Mendel et al. 1992). The U.S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2004; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2004 was funded by the Bonneville Power Administration, Idaho Power Company, and Bureau of Land Management.« less
NASA Astrophysics Data System (ADS)
Keith, M. K.; Wallick, R.; Taylor, G.; Mangano, J.; White, J.; Schenk, L.
2016-12-01
Drawdowns at Fall Creek Lake, Oregon—one of 13 U.S. Army Corp of Engineers reservoirs in the Willamette Valley Project—lower lake levels to facilitate downstream passage of juvenile spring Chinook salmon through the 55-m high dam. The annual (since 2011) winter drawdowns have improved fish passage, but temporarily lowering Fall Creek Lake nearly to streambed levels has increased downstream transport of predominantly fine (<2 mm) sediment to the lower gravel bed reaches of Fall Creek and the Middle Fork Willamette River. The annual release of reservoir sediments into these historically dynamic reaches has uncertain consequences for aquatic and riparian habitats. In this study, we 1) document reach-scale geomorphic responses to sediment released from Fall Creek Lake over 2011-15 and 2) evaluate linkages between reservoir operations, sediment releases, and resulting downstream responses. Results so far show aggradation of off-channel features such as side-channels, although deposition patterns have changed over 2011-15. Sites along Fall Creek that filled with sand during earlier drawdowns accumulated silt and clay during the 2015 drawdown. Further downstream on the Middle Fork Willamette River, some sites have aggraded almost 2 m with sand through 2015, although most off-channel aggradation has been less than 0.6 meters. During winter of 2015-16, we measured deposition at nine sites; most high bar and low floodplain deposition occurred during 2 weeks after the drawdown when flows were about 35-75% higher than those during the drawdown, suggesting post-drawdown dam operations potentially could be used to minimize associated sediment impacts.
Annual Coded Wire Tag Program; Missing Production Groups, 1996 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastor, Stephen M.
1997-01-01
In 1989 the Bonneville Power Administration (BPA) began funding the evaluation of production groups of juvenile anadromous fish not being coded-wire tagged for other programs. These groups were the ''Missing Production Groups''. Production fish released by the U.S. Fish and Wildlife Service (USFWS) without representative coded-wire tags during the 1980's are indicated as blank spaces on the survival graphs in this report. The objectives of the ''Missing Production Groups'' program are: (1) to estimate the total survival of each production group, (2) to estimate the contribution of each production group to various fisheries, and (3) to prepare an annual reportmore » for all USFWS hatcheries in the Columbia River basin. Coded-wire tag recovery information will be used to evaluate the relative success of individual brood stocks. This information can also be used by salmon harvest managers to develop plans to allow the harvest of excess hatchery fish while protecting threatened, endangered, or other stocks of concern. In order to meet these objectives, a minimum of one marked group of fish is necessary for each production release. The level of marking varies according to location, species, and age at release. In general, 50,000 fish are marked with a coded-wire tag (CWT) to represent each production release group at hatcheries below John Day Dam. More than 100,000 fish per group are usually marked at hatcheries above John Day Dam. All fish release information, including marked/unmarked ratios, is reported to the Pacific States Marine Fisheries Commission (PSMFC). Fish recovered in the various fisheries or at the hatcheries are sampled to recover coded-wire tags. This recovery information is also reported to PSMFC.« less
NASA Astrophysics Data System (ADS)
Flanagan, S.; Schachter, J. M.; Schissel, D. P.
2001-10-01
A Data Analysis Monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility. The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded thus increasing the efficiency of experimental time. An example of a consistency check is comparing the stored energy from integrating the measured kinetic profiles to that calculated from magnetic measurements by EFIT. This new system also tracks the progress of MDSplus dispatching of software for data analysis and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, Clips to implement expert system logic, and displays its results to multiple web clients via HTML. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse. A demonstration of this system including a simulated DIII-D pulse cycle will be presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Comparative Survival Study Oversight Committee and Fish Passage Center
2008-12-02
The Comparative Survival Study (CSS; BPA Project 199602000) began in 1996 with the objective of establishing a long term dataset of the survival rate of annual generations of salmon from their outmigration as smolts to their return to freshwater as adults to spawn (smolt-to-adult return rate; SAR). The study was implemented with the express need to address the question whether collecting juvenile fish at dams and transporting them downstream in barges and trucks and releasing them downstream of Bonneville Dam was compensating for the effect of the Federal Columbia River Power System (FCRPS) on survival of Snake Basin spring/summer Chinookmore » salmon migrating through the hydrosystem. The Completion of this annual report for the CSS signifies the 12th outmigration year of hatchery spring/summer Chinook salmon marked with Passive Integrated Transponder (PIT) tags as part of the CSS and the 9th complete brood year return as adults of those PIT-tagged fish (report covers adult returns from 1997-2006 hatchery Chinook juvenile migrations). In addition, the CSS has provided PIT-tags to on-going tagging operations for wild Chinook since 2002 (report covers adult returns from 1994-2006 wild Chinook juvenile migrations). The CSS tags wild steelhead on the lower Clearwater River and utilized wild and hatchery steelhead from other tagging operations in evaluations of transportation (report covers adult returns from 1997-2005 wild and hatchery steelhead migrations). The primary purpose of this report is to update the time series of smolt-to-adult survival rate data and related parameters with additional years of data since the completion of the CSS 10-yr retrospective analysis report (Schaller et al 2007). The 10-yr report provided a synthesis of the results from this ongoing study, the analytical approaches employed, and the evolving improvements incorporated into the study as reported in CSS annual progress reports. This current report specifically addresses the constructive comments of the most recent regional technical review conducted by the Independent Scientific Advisory Board and Independent Scientific Review Panel (ISAB and ISRP 2007). This report completes the 3-salt returns from migration years 2004 for wild and hatchery Chinook and steelhead (all returns are to Lower Granite Dam). For wild and hatchery Chinook, this report also provides 3-salt returns from migration year 2005 and 2-salt returns from migration year 2006 through a cutoff date of August 13, 2008. For wild and hatchery steelhead, it provides completed 2-salt returns for wild and hatchery steelhead that outmigrated in 2005 (any 3-salt returns of PIT-tagged steelhead are few, but will occur after July 1, 2008). All of the Chinook salmon evaluated in the CSS study exhibit a stream-type life history. All study fish used in this report were uniquely identifiable based on a PIT-tag implanted in the body cavity during (or before) the smolt life stage and retained through their return as adults. These tagged fish can then be detected as juveniles and adults at several locations of the Snake and Columbia rivers. Reductions in the number of individuals detected as the tagged fish grow older provide estimates of survival. This allows comparisons of survival over different life stages between fish with different experiences in the hydrosystem (e.g. transportation vs. in-river migrants and migration through various numbers of dams) as illustrated in Figure 1.1. The CSS is a long term study within the Northwest Power and Conservation Council's Columbia Basin Fish and Wildlife Program (NPCC FWP) and is funded by Bonneville Power Administration (BPA). Study design and analyses are conducted through a CSS Oversight Committee with representation from Columbia River Inter-Tribal Fish Commission (CRITFC), Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), U.S. Fish and Wildlife Service (USFWS), and Washington Department of Fish and Wildlife (WDFW). The Fish Passage Center (FPC) coordinates the PIT-tagging efforts, data management and preparation, and CSSOC work. The location of all tagging sites is identified in Figures 1.2 and 1.3. All draft and final written work products are subject to regional technical and public review and are available electronically on FPC and BPA websites: FPC: http://www.fpc.org/documents/CSS.html; and BPA: http://www.efw.bpa.gov/searchpublications/index.aspx?projid.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMichael, Geoffrey A.; Harnish, Ryan A.; Skalski, John R.
Uncertainty regarding the migratory behavior and survival of juvenile salmonids passing through the lower Columbia River and estuary after negotiating dams on the Federal Columbia River Power System (FCRPS) prompted the development and application of the Juvenile Salmon Acoustic Telemetry System (JSATS). The JSATS has been used to investigate the survival of juvenile salmonid smolts between Bonneville Dam (river kilometer (rkm) 236) and the mouth of the Columbia River annually since 2004. In 2010, a total of 12,214 juvenile salmonids were implanted with both a passive integrated transponder (PIT) and a JSATS acoustic transmitter. Using detection information from JSATS receivermore » arrays deployed on dams and in the river, estuary, and plume, the survival probability of yearling Chinook salmon and steelhead smolts tagged at John Day Dam was estimated form multiple reaches between rkm 153 and 8.3 during the spring. During summer, the survival probability of subyearling Chinook salmon was estimated for the same reaches. In addition, the influence of routes of passage (e.g., surface spill, deep spill, turbine, juvenile bypass system) through the lower three dams on the Columbia River (John Day, The Dalles, and Bonneville) on juvenile salmonid smolt survival probability from the dams to rkm 153 and then between rkm 153 and 8.3 was examined to increase understanding of the immediate and latent effects of dam passage on juvenile salmon survival. Similar to previous findings, survival probability was relatively high (>0.95) for most groups of juvenile salmonids from the Bonneville Dam tailrace to about rkm 50. Downstream of rkm 50 the survival probability of all species and run types we examined decreased markedly. Steelhead smolts suffered the highest mortality in this lower portion of the Columbia River estuary, with only an estimated 60% of the tagged fish surviving to the mouth of the river. In contrast, yearling and subyearling Chinook salmon smolts survived to the mouth of the river at higher rates, with estimated survival probabilities of 84% and 86%, respectively. The influence of route of passage at the lower three dams in the FCRPS on juvenile salmonid survival appeared to be relatively direct and immediate. Significant differences in estimated survival probabilities of juvenile salmonid smolts among groups with different dam passage experiences were often detected between the dams and rkm 153. In contrast, the influence of route of passage on survival to the mouth of the Columbia River was not apparent among the groups of tagged juvenile salmonids with different FCRPS passage experiences after they had already survived to a point about 80 km downstream of Bonneville Dam. Yearling Chinook salmon and steelhead smolts that migrated through the lower estuary in off-channel habitats took two to three times longer to travel through these lower reaches and their estimated survival probabilities were not significantly different from that of their cohorts which migrated in or near the navigation channel. A large proportion of the tagged juvenile salmonids migrating in or near the navigation channel in the lower estuary crossed from the south side of the estuary near Astoria, Oregon and passed through relatively shallow expansive sand flats (Taylor Sands) to the North Channel along the Washington shore of the estuary. This migratory behavior may contribute to the avian predation losses observed on for fish (2 to 12% of fish in this study).« less
Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2005-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less
Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2004-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less
NASA Astrophysics Data System (ADS)
Allison, M. A.; Biedenharn, D. S.; Dahl, T. A.; Kleiss, B.; Little, C. D.
2017-12-01
Annual suspended sediment loads and water discharges were calculated in the Mississippi River mainstem channel, and at the most downstream gaging station for major tributaries, from below the Missouri confluence near St. Louis, MO to Belle Chasse, LA, as well as down the Atchafalaya distributary for water years 1990 to 2013. The purpose of the present study was to assess changes in the Mississippi River sediment budget over the past half century, and to examine the continuing role that anthropogenic (e.g., dams, river control works, soil conservation practices) and natural (e.g., rainfall and denudation rates) factors have in controlling these changes. Sixteen of the 17 measured Mississippi River tributaries decreased in total suspended sediment load) from 1970-1978 to 1990-2013. The largest decreases occurred in the 2nd (Ohio River, 41% of 1970-1978) and 4th (Arkansas River, 45% of 1970-1978) largest water sources to the Mississippi. The Missouri River remains the largest Mississippi River tributary in terms of average annual suspended sediment flux; its relative contribution increased from 38% to 51% of the total flux from the 17 measured tributaries, even as its total suspended flux declined by 13%. Averaged over the period of study (WY 1990-2013), water flux increased by 468% and sediment flux increased by 37,418% downstream from the Gavin's Point Dam to the confluence with the Mississippi. Possible reasons for this disproportional increase in suspended sediment load downstream include sediment-rich contributions from 2nd order rivers below the dams and channel incision. Suggested station improvements to the system include improved monitoring of the Upper Mississippi and Arkansas River tributaries, establishing additional mainstem stations in the reach between Thebes, IL and Arkansas City, AR, and standardization of laboratory and field methodologies to eliminate a major source of station-to-station and time-series variability in the sediment budgeting.
Armando González-Cabán; John Loomis
1999-01-01
A contingent valuation in-person survey of Puerto Rican households was performed from April to August 1995 to estimate their willingness-to-pay for preserving instream flows in the RÃo Mameyes and avoiding a dam on the RÃo Fajardo. Annual willingness-to-pay was $21 for each river. When expanded to the 1 million households in Puerto Rico for the 5-year period households...
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1966. Volume 1
1966-01-01
Pines ), Cypress Creek, Tex. 4,336,000 Clark Hill Reservoir, Savannah River, S.C. & Ga. -------- 4,264,000 Lake Cumberland (Wolf Creek Dam), Cumberland... Plymouth Harbor, Mass ......... Rollison Channel, N.C - Texas City Channel, Tex. (40- foot)----------- Wallisville Reservoir_ Schedul Date started fiscal...Project Pat Mayse, Tex - Perry, Kans__ Perry County, Mo- Pine Creek, Okla _ Pine Flat, Calif_ Fiscal year started 1965 1964 1937 1963 1947 Proctor, Tex_
Lower Granite Dam Smolt Monitoring Program, 1998 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Verhey, Peter; Ross, Doug; Morrill, Charles
1998-12-01
The 1998 fish collection season at Lower Granite was characterized by relatively moderate spring flows and spill, moderate levels of debris, cool spring, warm summer and fall water temperatures, and increased chinook numbers, particularly wild subyearling chinook collected and transported. The Fish Passage Center's Smolt Monitoring Program is designed to provide a consistent, real-time database on fish passage and document the migrational characteristics of the many stocks of salmon and steelhead in the Columbia Basin.
14. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
14. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. MAIN (TITLED FLORENCE) CANAL, PRISON WASH CROSSING, 3/9/25 - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ
16. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
16. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. MAIN (TITLED FLORENCE) CANAL, CHECK AND PIMA, LATERAL TURNOUT, 3/9/25 - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ
15. Photographic copy of photograph. (Source: U.S. Department of Interior. ...
15. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. MAIN (TITLED FLORENCE) CANAL, BOGARD WASH INTAKE, 3/9/25 - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ
Clarks Hill Lake Water Quality Study.
1982-06-01
multipurpose project designed to reduce flooding on the Savannah River, generate electric power and increase the depth of the Savannah River for... power plant at the dam has seven generators, each with a capacity of 40,000 kilowatts. The average annual energy output of Clarks Hill Power Plant is 700...feet) from the top of power pool elevation of 100.6 meters (330 feet msl) to a minimum pool elevation of 95.1 meters (312 feet msl). Because of below
Piana, Pitágoras A.; Cardoso, Bárbara F.; Dias, Joilson; Gomes, Luiz C.; Agostinho, Angelo A.; Miranda, Leandro E.
2017-01-01
Populations show spatial-temporal fluctuations in abundance, partly due to random processes and partly due to self-regulatory processes. We evaluated the effects of various external factors on the population numerical abundance of curimba Prochilodus lineatus in the upper Paraná River floodplain, Brazil, over a 19-year period. Panel data analysis was applied to examine the structure of temporal and spatial abundance while controlling auto-regressive processes and spatial non-homogeneity variances that often obscure relationships. As sources of population variation, we considered predation, competition, selected abiotic variables, construction of a dam upstream of the study area, water level and flood intensity during the spawning period. We found that biological interactions (predation and competition) were not significantly related to variations in curimba abundance; specific conductance was a space indicator of abundance, apparently linked to the biology of the species; intensity of floods determined inter-annual variation in abundances; Porto Primavera Dam negatively impacted the abundances at sites in the floodplain directly affected by discharges from the dam. Panel data analysis was a powerful tool that identified the need for intense flooding to maintain high abundances of curimba in the upper Paraná River. We believe our results apply to other species with similar life strategy.
Assessment of the Fishery Improvement Opportunities on the Pend Oreille River, 1988 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barber, Michael R.; Willms, Roger A.; Scholz, Allan T.
1989-10-01
The purpose of this study is to assess the fishery improvement opportunities on the Box Canyon portion of the Pend Oreille River. This report contains the findings of the first year of the study. Chinook salmon (Oncorhynchus tshawytscha (Walbaum)) and steelhead (Oncorhynchus mykiss (Richardson)) were present in the Pend Oreille River prior to the construction of Grand Coulee Dam. The river also contained native cutthroat trout (Oncorhynchus clarki (Richardson)), bull trout (Salvelinus confluentus (Walbaum)) and mountain whitefish (Prosopium williamsoni (Girard)). Rainbow trout were planted in the river and some grew to lengths in excess of 30 inches. With the constructionmore » of Box Canyon Dam, in 1955, the most productive section of the river was inundated. Following the construction of the dam the trout fishery declined and the populations of spiny ray fish and rough fish increased. The objectives of the first year of the study were to determine the relative abundance of each species in the river and sloughs; the population levels in fish in the river and four selected tributaries; fish growth rates; the feeding habits and abundance of preferred prey; the migration patterns; and the total fishing pressure, catch per unit effort, and total harvest by conducting a year-round creel survey. 132 refs.« less
SVP-like MADS Box Genes Control Dormancy and Budbreak in Apple
Wu, Rongmei; Tomes, Sumathi; Karunairetnam, Sakuntala; Tustin, Stuart D.; Hellens, Roger P.; Allan, Andrew C.; Macknight, Richard C.; Varkonyi-Gasic, Erika
2017-01-01
The annual growth cycle of trees is the result of seasonal cues. The onset of winter triggers an endodormant state preventing bud growth and, once a chilling requirement is satisfied, these buds enter an ecodormant state and resume growing. MADS-box genes with similarity to Arabidopsis SHORT VEGETATIVE PHASE (SVP) [the SVP-like and DORMANCY ASSOCIATED MADS-BOX (DAM) genes] have been implicated in regulating flowering and growth-dormancy cycles in perennials. Here, we identified and characterized three DAM-like (MdDAMs) and two SHORT VEGETATIVE PHASE-like (MdSVPs) genes from apple (Malus × domestica ‘Royal Gala’). The expression of MdDAMa and MdDAMc indicated they may play a role in triggering autumn growth cessation. In contrast, the expression of MdDAMb, MdSVPa and MdSVPb suggested a role in maintaining bud dormancy. Consistent with this, ectopic expression of MdDAMb and MdSVPa in ‘Royal Gala’ apple plants resulted in delayed budbreak and architecture change due to constrained lateral shoot outgrowth, but normal flower and fruit development. The association of MdSVPa and MdSVPb expression with floral bud development in the low fruiting ‘Off’ trees of a biennial bearing cultivar ‘Sciros’ suggested the SVP genes might also play a role in floral meristem identity. PMID:28421103
ERIC Educational Resources Information Center
Brown, Daniel W.; And Others
This document comprises three progress reports for a 5-year environmental aging study aimed at establishing the lifetimes of magnetic tapes and the poly(ethylene terephthalate) (PET) base of photographic and electronic film under archival storage conditions. The first annual report (1982) introduces the rationale for the project, provides…
NASA Astrophysics Data System (ADS)
Naganna, Sujay Raghavendra; Deka, Paresh Chandra
2018-07-01
The hydro-geological properties of streambed together with the hydraulic gradients determine the fluxes of water, energy and solutes between the stream and underlying aquifer system. Dam induced sedimentation affects hyporheic processes and alters substrate pore space geometries in the course of progressive stabilization of the sediment layers. Uncertainty in stream-aquifer interactions arises from the inherent complex-nested flow paths and spatio-temporal variability of streambed hydraulic properties. A detailed field investigation of streambed hydraulic conductivity (Ks) using Guelph Permeameter was carried out in an intermittent stream reach of the Pavanje river basin located in the mountainous, forested tract of western ghats of India. The present study reports the spatial and temporal variability of streambed hydraulic conductivity along the stream reach obstructed by two Vented Dams in sequence. Statistical tests such as Levene's and Welch's t-tests were employed to check for various variability measures. The strength of spatial dependence and the presence of spatial autocorrelation among the streambed Ks samples were tested by using Moran's I statistic. The measures of central tendency and dispersion pointed out reasonable spatial variability in Ks distribution throughout the study reach during two consecutive years 2016 and 2017. The streambed was heterogeneous with regard to hydraulic conductivity distribution with high-Ks zones near the backwater areas of the vented dam and low-Ks zones particularly at the tail water section of vented dams. Dam operational strategies were responsible for seasonal fluctuations in sedimentation and modifications to streambed substrate characteristics (such as porosity, grain size, packing etc.), resulting in heterogeneous streambed Ks profiles. The channel downstream of vented dams contained significantly more cohesive deposits of fine sediment due to the overflow of surplus suspended sediment-laden water at low velocity and pressure head. The statistical test results accept the hypothesis of significant spatial variability of streambed Ks but refuse to accept the temporal variations. The deterministic and geo-statistical approaches of spatial interpolation provided virtuous surface maps of streambed Ks distribution.
Tolcos, Mary; Rees, Sandra; McGregor, Hugh; Walker, David
2002-01-01
The purpose of this study was to determine the effects of prenatal growth restriction on the ventilatory and thermoregulatory responses to asphyxia and hypercapnia in the newborn guinea-pig. Spontaneously growth-restricted (SGR) animals born to unoperated dams, and growth-retarded (GR) neonates born to dams in which a uterine artery had been ligated at mid gestation, were studied and compared with control neonates. Ventilatory responses to progressive asphyxia and steady-state hypercapnia were tested at 3-6 days of age using a barometric plethysmograph. The animals were then killed and the brains prepared for histological and immunohistochemical analysis. During progressive asphyxia, SGR neonates (n = 5) had a significantly increased minute ventilation compared with both control (n = 6) and GR (n = 5) neonates. Rectal temperature fell significantly in GR and SGR neonates after progressive asphyxia, but was unchanged in control neonates. The ventilatory responses to steady-state hypercapnia were not different in the GR, SGR and control neonates. The immunoreactive expression of glial fibrillary acidic protein, tyrosine hydroxylase, substance P and met-enkephalin in the medulla was also not different between the three groups. It was concluded that prenatal growth restriction is associated with alterations in the respiratory and thermoregulatory responses to asphyxia and hypercapnia, with greater effects observed when in utero growth restriction arises spontaneously, compared with that produced experimentally over approximately the last half of gestation.
Population and water. Interview: Genady Golubev.
1993-01-01
Irrigated cropland yields 36% of all global food crops. Without dams, some countries are forced to increase arable lands or to boost agricultural production. Dry farming poses environmental problems, e.g, those linked to chemical use. Dams also cause environmental problems. Egypt's Aswan dam has stopped the annual floods replenished the lands with natural fertilizer. On the other hand, it provides almost 25% of Egypt's energy needs. Irrigation has expanded areas on which to plant crops, thereby meeting Egypt's rising food needs. The Nile had very low water levels for 7 years during the 1980s so the dam prevented a disaster. The World Conservation Union does not endorse engineered solutions to water scarcity because they generally result in bad watershed management. An irrigation scheme in the former Soviet Union was handled so poorly that it created 1 of this century;s worst environmental disasters--shrinking of the Aral Sea in Kazakhstan. This resulted in destruction of its fisheries, pollution from pesticides, large scale salinization, inferior water quality, and declining health of the people in the area. The Government of India has embarked on an irrigation scheme, the Narmada River dam project. In April 1993, it cancelled its loans with the World Bank because it could not abide by the Bank's tough environmental conditions, but the government intends to go ahead with the project on its own. Natural drainage is required for sustainable irrigation schemes, some of which have endured for centuries. Most of the 26 intensely water scarce countries have rapidly growing populations and are in Africa and the Middle East. The best way for these countries to address this scarcity is to use existing water better, ideally in a way that minimized environmental damage. By 2025, at least 96 countries will be facing great water shortages. Water scarcity will spark conflicts between countries and within countries. The world probably cannot provide enough water to support 8-10 billion people.
NASA Astrophysics Data System (ADS)
Yang, H. F.; Yang, S. L.; Meng, Y.; Xu, K. H.; Luo, X. X.; Wu, C. S.; Shi, B. W.
2018-03-01
After more than 50,000 dams were built in the Yangtze basin, especially the Three Gorges Dam (TGD) in 2003, the sediment discharge to the East China Sea decreased from 470 Mt/yr before dams to the current level of 140 Mt/yr. The delta sediment's response to this decline has interested many researchers. Based on a dataset of repeated samplings at 44 stations in this study, we compared the surficial sediment grain sizes in the southern Yangtze subaqueous delta front for two periods: pre-TGD (1982) and post-TGD (2012). External factors of the Yangtze River, including water discharge, sediment discharge and suspended sediment grain size, were analysed, as well as wind speed, tidal range and wave height of the coastal ocean. We found that the average median size of the sediments in the delta front coarsened from 8.0 μm in 1982 to 15.4 μm in 2012. This coarsening was accompanied by a decrease of clay components, better sorting and more positive skewness. Moreover, the delta morphology in the study area changed from an overall accretion of 1.0 cm/yr to an erosion of - 0.6 cm/yr. At the same time, the riverine sediment discharge decreased by 70%, and the riverine suspended sediment grain size increased from 8.4 μm to 10.5 μm. The annual wind speed and wave height slightly increased by 2% and 3%, respectively, and the tidal range showed no change trend. Considering the increased wind speed and wave height, there was no evidence that the capability of the China Coastal Current to transport sediment southward has declined in recent years. The sediment coarsening in the Yangtze delta front was thus mainly attributed to the delta's transition from accumulation to erosion which was originally generated by river damming. These findings have important implications for sediment change in many large deltaic systems due to worldwide human impacts.
American shad in the Columbia River
Petersen, J.H.; Hinrichsen, R.A.; Gadomski, D.M.; Feil, D.H.; Rondorf, D.W.
2003-01-01
American shad Alosa sapidissima from the Hudson River, New York, were introduced into the Sacramento River, California, in 1871 and were first observed in the Columbia River in 1876. American shad returns to the Columbia River increased greatly between 1960 and 1990, and recently 2-4 million adults have been counted per year at Bonneville Dam, Oregon and Washington State (river kilometer 235). The total return of American shad is likely much higher than this dam count. Returning adults migrate as far as 600 km up the Columbia and Snake rivers, passing as many as eight large hydroelectric dams. Spawning occurs primarily in the lower river and in several large reservoirs. A small sample found returning adults were 2-6 years old and about one-third of adults were repeat spawners. Larval American shad are abundant in plankton and in the nearshore zone. Juvenile American shad occur throughout the water column during night, but school near the bottom or inshore during day. Juveniles consume a variety of zooplankton, but cyclopoid copepods were 86% of the diet by mass. Juveniles emigrate from the river from August through December. Annual exploitation of American shad by commercial and recreational fisheries combined is near 9% of the total count at Bonneville Dam. The success of American shad in the Columbia River is likely related to successful passage at dams, good spawning and rearing habitats, and low exploitation. The role of American shad within the aquatic community is poorly understood. We speculate that juveniles could alter the zooplankton community and may supplement the diet of resident predators. Data, however, are lacking or sparse in some areas, and more information is needed on the role of larval and juvenile American shad in the food web, factors limiting adult returns, ocean distribution of adults, and interactions between American shad and endangered or threatened salmonids throughout the river. ?? 2003 by the American Fisheries Society.
Voichick, Nicholas
2008-01-01
The construction of Glen Canyon Dam, completed in 1963, resulted in substantial physical and biological changes to downstream Colorado River environments between Lake Powell and Lake Mead - an area almost entirely within Grand Canyon National Park, Ariz. In an effort to understand these changes, data have been collected to assess the condition of a number of downstream resources. In terms of measuring water quality, the collection of specific-conductance data is a cost-effective method for estimating salinity. Data-collection activities were initially undertaken by the Bureau of Reclamation's Glen Canyon Environmental Studies (1982-96); these efforts were subsequently transferred to the U.S. Geological Survey's Grand Canyon Monitoring and Research Center (1996 to the present). This report describes the specific-conductance dataset collected for the Colorado River between Glen Canyon Dam and Diamond Creek from 1988 to 2007. Data-collection and processing methods used during the study period are described, and time-series plots of the data are presented. The report also includes plots showing the relation between specific conductance and total dissolved solids. Examples of the use of specific conductance as a natural tracer of parcels of water are presented. Analysis of the data indicates that short-duration spikes and troughs in specific-conductance values lasting from hours to days are primarily the result of flooding in the Paria and Little Colorado Rivers, Colorado River tributaries below Glen Canyon Dam. Specific conductance also exhibits seasonal variations owing to changes in the position of density layers within the reservoir; these changes are driven by inflow hydrology, meteorological conditions, and background stratification. Longer term trends in Colorado River specific conductance are reflective of climatological conditions in the upper Colorado River Basin. For example, drought conditions generally result in an increase in specific conductance in Lake Powell. Therefore, the average annual specific conductance below Glen Canyon Dam is inversely related to the volume of water in Lake Powell.
Assessment of sediment yield in a sloping Mediterranean watershed in Cyprus
NASA Astrophysics Data System (ADS)
Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado
2014-05-01
In the Mediterranean region, water catchment sediment yield as a result of erosion is higher than in many other regions in Europe due to the climatic conditions, topography, lithology and land-use. Modelling sediment transport is difficult due to intermittent stream flow and highly irregular rainfall conditions in this region. The objective of this study is to quantify sediment yield of a highly sloping Mediterranean environment. This study is conducted in the Peristerona Watershed in Cyprus, which has ephemeral water flow. In the downstream area a series of check dams have been placed across the stream to slow the flow and increase groundwater recharge. The surface area of the watershed, upstream of the check dams, is 103 km2 with elevation changing between 1540 m and 280 m and a mean local slope higher than 40% for the mountainous part and lower than 8% for the plain. The long-term average annual precipitation ranges from 755 mm in the upstream area to 276 mm in the plain. The surface extent of the sediment that was deposited at the most upstream check dam during two seasons was measured with a Differential Global Positioning System. The depth of the sediment was measured with utility poles and bulk density samples from the sediment profile were collected. The sediment had a surface area of 12600 m2 and an average depth of 0.23 m. The mean of the sediment dry bulk density samples was 1.05 t m-3 with a standard deviation of 0.11. Based on these values, area specific sediment yield was computed as 1 t ha-1 per year for the entire catchment area upstream of the check dam, assuming a check dam sediment trap efficiency of 15%. Erosion in the watershed is currently modeled with PESERA using detailed watershed data.
Rimayi, Cornelius; Odusanya, David; Weiss, Jana M; de Boer, Jacob; Chimuka, Luke
2018-06-15
A quantitative assessment of pollutants of emerging concern in the Hartbeespoort Dam catchment area was conducted using liquid chromatography-tandem mass spectrometry (LC-MS/MS) to establish the occurrence, source and distribution of 15 environmental pollutants, including 10 pharmaceuticals, 1 pesticide and 4 steroid hormones. Seasonal sampling was conducted in the Hartbeespoort Lake using sub-surface grab sampling to determine the lake's ecological status and obtain data for establishment of progressive operational monitoring. The Jukskei River, which lies upstream of the Hartbeespoort Dam, was sampled in the winter season. Five year old carp (Cyprinus carpio) and catfish (Clarias gariepinus) were also sampled from the Hartbeespoort Dam to study bioaccumulation in biota as well as to estimate risk associated with fish consumption. In the Jukskei River, the main source of 11 emerging pollutants (EPs) was identified as raw sewage overflow, with the highest ∑11 EP concentration of 593ngL -1 being recorded at the Midrand point and the lowest ∑11 EP concentration of 164ngL -1 at the N14 site located 1km downstream of a large wastewater treatment plant. The Jukskei River was found to be the largest contributor of the emerging contaminants detected in the Hartbeespoort Dam. In the Hartbeespoort Dam EP concentrations were generally in the order efavirenz>nevirapine>carbamazepine>methocarbamol>bromacil>venlafaxine. Water and sediment were sampled from the uMngeni River estuary within 24h after large volumes of an assortment of pharmaceutical waste had been discovered to be washed into the river estuary after flash rainfall on 18 May 2016. Analytical results revealed high levels of some emerging pollutants in sediment samples, up to 81ngg -1 for nevirapine and 4ngg -1 for etilefrine HCL. This study shows that efavirenz, nevirapine, carbamazepine, methocarbamol, bromacil and venlafaxine are contaminants that require operational monitoring in South African urban waters. Copyright © 2018. Published by Elsevier B.V.
Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete
2005-01-01
River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.
Sediment supply as a driver of river evolution in the Amazon Basin
NASA Astrophysics Data System (ADS)
Ahmed, Joshua; Constantine, José Antonio; Dunne, Thomas; Legleiter, Carl; Lazarus, Eli D.
2015-04-01
The Amazon represents the only large river basin in the world where there is a sufficient range of sediment supplies and a lack of engineering controls to assess how sediment supply drives the evolution of meandering rivers. Despite recent analytical advances (Asahi et al., 2013; Pittaluga and Seminara, 2011), modern theory does not yet identify or explain the effects of externally imposed sediment supplies, a fundamental river characteristic, on meandering river evolution. These sediment supplies would be radically reduced by the construction of large dams proposed for the Amazon Basin (Finer and Jenkins, 2012). Here, we demonstrate that the sediment loads imposed by their respective drainage basins determine planform changes in lowland rivers across the Amazon. Our analysis, based on Landsat image sequences, indicates that rivers with high sediment loads draining the Andes and associated foreland basin experience annual migration rates that are on average four times faster than rivers with lower sediment loads draining the Central Amazon Trough and shields. Incidents of meander cutoff also occur more frequently along the rivers of the Andes and foreland basin, where the number of oxbows in the floodplains is more than twice that observed in the floodplains of the Central Amazon Trough and shields. Our results, which cannot be explained by differences in channel slope or hydrology, highlight the importance of sediment supply in modulating the ability of meandering alluvial rivers to reshape the floodplain environment through river migration. Asahi, K., Shimizu, Y., Nelson, J., Parker, G., 2013. Numerical simulation of river meandering with self-evolving banks. Journal of Geophysical Research: Earth Surface, 118(4), 2013JF002752. Finer, M., Jenkins, C.N., 2012. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity. PLOS One, 7(4), e35126. Pittaluga, M.B., Seminara, G., 2011. Nonlinearity and unsteadiness in river meandering: a review of progress in theory and modelling. Earth Surface Processes and Landforms, 36(1), 20-38.
Annual Coded Wire Tag Program; Oregon Stock Assessment, 2000 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mark; Mallette, Christine; Murray, William
2002-03-01
This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Annual Stock Assessment - Coded Wire Tag Program (ODFW) Project. Tule stock fall chinook were caught primarily in British Columbia and Washington ocean, and Columbia Basin fisheries. Up-river bright stock fall chinook contributed primarily to Alaska and British Columbia ocean commercial, Columbia Basin gillnet and freshwater sport fisheries. Contribution of Rogue stock fall chinook released in the lower Columbia River occurred primarily in Oregon ocean commercial, Columbia Basin gillnet and freshwater sport fisheries. Willamettemore » stock spring chinook contributed primarily to Alaska and British Columbia ocean, and Columbia Basin sport fisheries. Willamette stock spring chinook released by CEDC contributed to similar ocean fisheries, but had much higher catch in Columbia Basin gillnet fisheries than the same stocks released in the Willamette Basin. Up-river stocks of spring chinook contributed almost exclusively to Columbia Basin fisheries. The up-river stocks of Columbia River summer steelhead contributed almost exclusively to the Columbia Basin gillnet and freshwater sport fisheries. Coho ocean fisheries from Washington to California were closed or very limited from 1994 through 1999 (1991 through 1996 broods). This has resulted in a lower percent of catch in Washington, Oregon and California ocean fisheries, and a higher percent of catch in Alaska and British Columbia ocean and Columbia Basin freshwater fisheries. Coho stocks released by ODFW below Bonneville Dam were caught mainly in Oregon, Washington, and British Columbia ocean, Columbia Gillnet and freshwater sport fisheries. Coho stocks released in the Klaskanine River and Youngs Bay area had similar ocean catch distributions, but a much higher percent catch in gillnet fisheries than the other coho releases. Ocean catch distribution of coho stocks released above Bonneville Dam was similar to the other coho groups. However, they had a higher percent catch in gillnet fisheries above Bonneville Dam than coho released below the dam. Survival rates of salmon and steelhead are influenced, not only by factors in the hatchery (disease, density, diet, size and time of release) but also by environmental factors in the river and ocean. These environmental factors are influenced by large scale oceanic and weather patterns such as El Nino. Changes in rearing conditions in the hatchery do impact survival, however, these can be offset by impacts caused by environmental factors. Coho salmon released in the Columbia River generally experience better survival rates when released later in the spring. However, for the 1990 brood year June releases of Columbia River coho had much lower survival than May releases, for all ODFW hatcheries. In general survival of ODFW Columbia River hatchery coho has declined to low levels in recent years. Preliminary results from the evaluation of Visual Implant Elastomer (VIE) tags showed tagging rate and pre-release tag retention improved from the first to second years of tagging. Tagging rate remained identical from 1999 to 2000 while pre-release tag retention dropped to 95%. Returning jack and adult salmon were sampled for CWT and VIE tags in the fall of 2000. Of 606 adults recovered at Sandy Fish Hatchery in 2000, only 1 or 0.2%, retained their VIE tag. Of 36 jacks recovered in 2000, 13 or 36.1% retained their VIE tag.« less
Annual Coded Wire Tag Program; Oregon Missing Production Groups, 1997 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mark A.; Mallette, Christine; Murray, William M.
1998-03-01
This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Annual Coded Wire Tag Program - Oregon Missing Production Groups Project. Tule stock fall chinook were caught primarily in British Columbia and Washington ocean, and Oregon freshwater fisheries. Up-river bright stock fall chinook contributed primarily to Alaska and British Columbia ocean commercial, and Columbia River gillnet and other freshwater fisheries. Contribution of Rogue stock fall chinook released in the lower Columbia River occurred primarily in Oregon ocean commercial and Columbia river gillnet fisheries. Willamettemore » stock spring chinook contributed primarily to Alaska and British Columbia ocean commercial, Oregon freshwater sport and Columbia River gillnet fisheries. Willamette stock spring chinook released by CEDC contributed to similar ocean fisheries, but had much higher catch in gillnet fisheries than the same stocks released in the Willamette system. Up-river stocks of spring chinook contributed almost exclusively to Columbia River sport fisheries and other freshwater recovery areas. The up-river stocks of Columbia River summer steelhead contributed primarily to the Columbia River gillnet and other freshwater fisheries. Coho ocean fisheries from Washington to California were closed or very limited from 1994 through 1997 (1991 through 1994 broods). This has resulted in a greater average percent of catch for other fishery areas. Coho stocks released by ODFW below Bonneville Dam contributed mainly to Oregon and Washington ocean, Columbia Gillnet and other freshwater fisheries. Coho stocks released in the Klaskanine River and Youngs Bay area had similar ocean catch, but much higher contribution to gillnet fisheries than the other coho releases. Coho stocks released above Bonneville Dam had similar contribution to ocean fisheries as other coho releases. However, they contributed more to gillnet fisheries above Bonneville Dam than coho released below the dam. Survival rates of salmon and steelhead are influenced, not only by factors in the hatchery (disease, density, diet, size and time of release) but also by environmental factors in the river and ocean. These environmental factors are influenced by large scale weather patterns such as El Nino over which man has no influence. Changes in rearing conditions in the hatchery, over which man has some influence, do impact the survival rates. However, these impacts can be offset by impacts caused by environmental factors. Coho salmon released in the Columbia River generally experience better survival rates when released later in the spring. However, for the 1990 brood year June releases of Columbia River coho had much lower survival than May releases, for all ODFW hatcheries. In general survival of ODFW Columbia River hatchery coho has declined to low levels since the 1989 brood year. In an effort to evaluate photonic marking as a tool to mass mark salmonids, two groups of 1995 brood juvenile coho salmon were marked at Sandy Hatchery. The first group (Group A) received a fluorescent red mark, adipose fin clip and coded-wire tag. The second group (Group B) received a cryptic blue mark, adipose fin clip and coded-wire tag. Both groups were released in the spring of 1997. No photonic marks were detected in the precocious males (jacks) returning to Sandy hatchery in the fall of 1997.« less
ERIC Educational Resources Information Center
Young, Harben Boutourline
This annual report of the Yale Project describes the progress made on the nutrition and growth study of Tunisian children from September 1, 1971 through August 31, 1972. The report details: (1) the progress in analysis of the cross-sectional study data, which was completed as of June 30, 1972, and (2) the development of the present longitudinal…
Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry
2003-06-09
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less
3 CFR - Improving Energy Security, American Competitiveness and Job Creation, and Environmental...
Code of Federal Regulations, 2011 CFR
2011-01-01
... source of fossil fuel consumption and greenhouse gas pollution. I therefore request that the... annual progress in reducing transportation sector emissions and fossil fuel consumption consistent with... substantial annual progress in reducing transportation sector greenhouse gas emissions and fossil fuel...
FY2014 Fuel & Lubricant Technologies Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stork, Kevin
2016-02-01
Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Regulated Area The entire water area of the Colorado River beginning at BlueWater Marina in Parker, AZ, and...°26′10″ N, 114°18′40″ W to 34°25′50″ N, 114°18′52″ W. 6. BlueWater Resort and Casino Spring Classic... area of the Colorado River in Parker, AZ. 7. BlueWater Resort and Casino Southwest Showdown Sponsor...
1982-06-01
p*A C.._ _ __ _ _ A, d.tibutiou is unhimta 4 iit 84~ L0 TABLE OF CONTENTS APPENDIX SCOPE OF WORK B MERGE AND COST PROGRAM DOCUMENTATION C FATSCO... PROGRAM TO COMPUTE TIME SERIES FREQUENCY RELATIONSHIPS D HEC-DSS - TIME SERIES DATA FILE MANAGEMENT SYSTEM E PLAN 1 -TIM SERIES DATA PLOTS AND ANNUAL...University of Minnesota, utilized an early version of the Hydrologic Engineering * Center’s (HEC) EEC-5c Computer Program . EEC is a Corps of Engineers
Lock and Dam Number 8 Hydropower Study; Mississippi River Near LaCrosse, Wisconsin. Supplement.
1985-01-01
unit used in scheme 3 is a standardized module consisting of an axial flow turbine , a speed increasing gear set, and a generator combined in a short...the flow and generating head ranges associated with specific turbine generator sizes, the program produces annual and monthly flow -duration curves and...open flume turbine passing a rated flow of 14O0 eta at a rated head of 9.75 feat. Cost estimates were made for two and four unit plants having
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1961. Volume 1
1961-01-01
dollars) Classification Total Active De - Ink Total Active De - In- ferred active ferred active Navigation..------------------ 2,604 2,450 42 112 6,138...Sioux City, Iowa.... New York and New Jersey Channels, N.Y. and N.J.. Pike Island Locks and Dam, Ohio River, W. Va..... Playa Del Rey Inlet and Harbor...Jun 61 -1965 Do. Hall Meadow Brook, Conn __ . ___------- - Oct 60 1962 Reservoir. Hunt and Lima Lake Drainage District, Illinois
Code of Federal Regulations, 2012 CFR
2012-07-01
... Mariners contact: Commander (dpw), Eleventh Coast Guard District, Coast Guard Island, Building 50-2... beginning at Bluewater Marina in Parker, AZ, and extending approximately 10 miles to La Paz County Park. 4...″ W. Boundary two from 34°26′50″ N, 114°20′41″ W to 34°27′14″ N, 114°20′55″ W. Boundary three from 34...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Mariners contact: Commander (dpw), Eleventh Coast Guard District, Coast Guard Island, Building 50-2... beginning at Bluewater Marina in Parker, AZ, and extending approximately 10 miles to La Paz County Park. 4...″ W. Boundary two from 34°26′50″ N, 114°20′41″ W to 34°27′14″ N, 114°20′55″ W. Boundary three from 34...
2005-11-01
5084. 6. Colpaert CG, Vermeulen PB, Benoy I, Soubry A, van Roy F, van Beest P, Goovaerts G, Dirix LY, van Dam P, Fox SB, Harris AL, van MarckEA...small GTPases, RhoA and RhoC, is associ- inflammatory breast cancer. Clin Exp Metastasis 2002, ated with tumor progression in ovarian carcinoma. Lab
Kuhn, Gerhard; Williams, Cory A.
2004-01-01
In 2003, the U.S. Geological Survey, in cooperation with the Colorado Water Conservation Board, Upper Colorado River Endangered Fish Recovery Program, Colorado River Water Conservation District, Colorado Division of Water Resources, and Bureau of Reclamation, initiated a study to characterize streamflow losses along a reach of the Gunnison River from the town of Whitewater downstream to the Redlands Canal diversion dam. This describes the methods and results of the study that include: (1) a detailed mass-balance analysis of historical discharge records that were available for the three streamflow-gaging stations along the study reach; and (2) two sets of discharge measurements that were made at the three stations and at four additional locations. Data for these existing streamflow-gaging stations were compiled and analyzed: (1) Gunnison River near Grand Junction (Whitewater station); (2) Gunnison River below Redlands Canal diversion dam (below-Redlands-dam station); and (3) Redlands Canal near Grand Junction (Redlands-Canal station). Data for water years 1995-2003 were used for the mass-balance analysis. Four intermediate sites (M1, M2, M3, and M4) were selected for discharge measurements in addition to the existing stations. The study reach is the approximate 12-mile reach of the Gunnison River from the Whitewater station downstream to the Redlands Canal diversion dam, which is about 3 miles upstream from the confluence with the Colorado River. For the mass-balance analysis, differences between the sum of the annual cumulative daily mean discharge at the two downstream stations and the annual cumulative daily mean discharges at the upstream station ranged from about -8,700 to -69,800 acre-feet (about -.8 to -1.1 percent), indicating that the downstream discharges generally were less than the upstream discharges. Moving 3-day daily mean discharge averages also were computed for each of the three stations to smooth out some of the abrupt differences between the downstream and upstream daily mean discharges. During water years 1995-2002, differences between the downstream and upstream moving 3-day daily mean discharges ranged from about -200 to +100 cubic feet per second (ft3/s) during one-half of each year, but the differences had absolute values as large as about 500 to 1,000 ft3/s during the other one-half of the year. The differences as a percentage of the upstream discharge ranged from 0 to -10 percent within the interquartile range and were as small or large as about -60 to +50. Two sets of discharge measurements were obtained during water year 2003. For measurement set 1 (February 5-6), discharge was measured 5-8 times over a 24-hour period at sites M1-M4, where measured discharges ranged from 527 to 608 ft3/s. Discharge was measured once each day at the Whitewater and below-Redlands-dam stations to verify discharge rating shifts; the Redlands Canal was not in operation at this time, so measurements were not needed at the Redlands-Canal station. Recorded 15-minute (unit) discharges ranged from about 575 to 615 ft3/s at the Whitewater station and from about 560 to 600 ft3/s at the below-Redlands-dam station during the February 5-6 period. Because of the inherent error in discharge measurements (5 percent for measurements rated good), and because the mean discharge at the below-Redlands-dam station, about 580 ft3/s, was only about 2.5 percent smaller than the mean discharge at the Whitewater station, about 595 ft3/s, it is concluded that there was no measurable streamflow loss along the study reach during measurement set 1. For measurement set 2 (May 14-15), discharge in the Gunnison River was about 2,000 ft3/s and increasing because of high-elevation snowmelt. Five discharge measurements were made at site M2 and discharge ranged from 1,668 to 2,117 ft3/s. Measured discharges at the gaging stations were 2,730 ft3/s at the Whitewater station, 1,268 ft3/s at the below-Redlands-dam station, and 819 ft3/s at the
76 FR 45234 - Information Collection; Submission for OMB Review, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... information collection request (ICR) entitled Annual Grantee Progress Report to the Office of Management and... through the use of appropriate automated, electronic, mechanical, or other technological collection... attached Annual Grantee Progress Report which will be used by grantees of the Corporation's AmeriCorps...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-10
... DEPARTMENT OF JUSTICE [OMB Number 1122-0006] Agency Information Collection Activities: Extension... Budget, Office of Information and Regulatory Affairs, Attention Department of Justice Desk Officer... hour to complete a semi-annual progress report. The semi-annual progress report is divided into...
The site designation for the Western and Central Long Island Sound disposal sites requires the completion of a Dredged Material Management Plan (DMMP) and EPA to conduct an annual review of progress toward completion of the DMMP.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... of a Currently Approved Collection: Semi-Annual Progress Report for the Sexual Assault Services...-Annual Progress Report for Grantees from the Sexual Assault Services Program--Grants to Culturally... sustainable sexual assault services provided by culturally specific organizations, which are uniquely situated...
Southeastern Community College Annual Progress Report, December 1995.
ERIC Educational Resources Information Center
Gardner, R. Gene
Presenting information on the status of Southeastern Community College (SCC), in Iowa, this annual progress report highlights basic institutional data, financial information, and improvements and planned changes of the college as of 1995. Part 1 presents basic data on SCC, including facility locations, assessed property valuation, district…
Modeling and sediment study in the watershed Medjerda, Tunisia
NASA Astrophysics Data System (ADS)
Kotti, Fatma; Mahé, Gil; Habaieb, Hamadi; Dieulin, Claudine; Hermassi, Taoufik
2015-04-01
Water projects have experienced a major expansion in the late 1980s, and we now have sufficient perspective to assess their actual performance and their socio-environmental impacts (Payan, 2007). This study focuses on the great watershed of Tunisia namely Medjerda which has an area of about 23,600 km2. In the main river of Medjerda some dams have been created for water retention: Sidi Salem Dam (the largest in the country), El Aroussia dam, and others on tributaries Mellegue Bouhertma, Siliana, Beni Mtir, Lakhemess and Kasseb. Since the construction of dams, essentially Sidi Salem and Siliana, the Medjerda river has undergone significant changes in morphology. The monitoring of the flow of the major hydrological stations in the pre-estuarine zone downstream from Sidi Salem dam is used to measure the impact of the constructions on hydrological regimes: reduction in average rates, reduction in volumes sold, altered seasonal pattern, and most of all reduction of the sediment transport, which the highest values are related to extreme events. In this context, the balance of sediment monitoring appears indispensable for the quantification of sediment transport at the outlet. Our approach is to calculate a specific flow rate relative to the area of the basin for every structure built in the Medjerda watershed, from the information available on transport and sedimentation rates known, combined with contours of each sub watershed. There are about ten dams spread throughout Medjerda watershed. The methodology is primarily developed for the Mellegue dam because we have at this station a long data set from 1955 until 2005. Other stations will be studied later on. The main objective of this study is to provide a series of annual variation of theoretical contributions. These calculated values will be compared with the actual measured sedimentary series. Two cores in the sediments of the pre-estuarine area are performed to determine past variability in sediment inputs over a time series than should be about one century. The cores' analysis results show a succession of sedimentary layers that likely correspond to different flood deposits that succeeded on this site, and especially the datation of the cores shows that the selected area is a very important deposition area. This sedimentary study will help estimate the sediment dynamics to major estuaries, which is poorly known for most of the rivers of Maghreb. The reduction of the sediment supply to the sea is tipped as a major factor to be taken into account for a better understanding of the dynamics of coastal areas in the context of global climate change and sea level rise. Keywords: sediment core, Medjerda watershed, dam, hydrology, modeling, Tunisia
Radioactivity Risk Assessment of Radon and Gamma Dose at One Uranium Tailings Pond in China
NASA Astrophysics Data System (ADS)
Lou, Yalong; Liu, Yong; Peng, Guowen; Zhao, Guodong; Zhang, Yan; Yang, Zhu
2018-01-01
A year-long monitoring of gamma radiation effective dose rate and radon concentration had been done in the reservoir area of one uranium tailings pond in Hunan province (The monitoring area included indoor and outdoor area of residential buildings and workshops, tailings dam slope). Afterwards, the annual effective radiation dose of the people in that radiation environment had been calculated based on the results of monitoring, as well as a radiation risk assessment. According to the assessment, gamma radiation effective dose rate and radon concentration in the monitoring area were low, and the annual effective radiation dose was far below the international standard (30mSv), which showed that the radiation would not put the people’s health at risk. However, the annual effective radiation dose of gamma was far above that of radon in the area of uranium tailings pond; therefore, it’s advisable to take quarantine measures in in the area of uranium tailings pond to keep the surrounding residents away from unnecessary ionizing radiation.
Quantification and Multi-purpose Allocation of Water Resources in a Dual-reservoir System
NASA Astrophysics Data System (ADS)
Salami, Y. D.
2017-12-01
Transboundary rivers that run through separate water management jurisdictions sometimes experience competitive water usage. Where the river has multiple existing or planned dams along its course, quantification and efficient allocation of water for such purposes as hydropower generation, irrigation for agriculture, and water supply can be a challenge. This problem is even more pronounced when large parts of the river basin are located in semi-arid regions known for water insecurity, poor crop yields from irrigation scheme failures, and human population displacement arising from water-related conflict. This study seeks to mitigate the impacts of such factors on the Kainji-Jebba dual-reservoir system located along the Niger River in Africa by seasonally quantifying and efficiently apportioning water to all stipulated uses of both dams thereby improving operational policy and long-term water security. Historical storage fluctuations (18 km3 to 5 km3) and flows into and out of both reservoirs were analyzed for relationships to such things as surrounding catchment contribution, dam operational policies, irrigation and hydropower requirements, etc. Optimum values of the aforementioned parameters were then determined by simulations based upon hydrological contributions and withdrawals and worst case scenarios of natural and anthropogenic conditions (like annual probability of reservoir depletion) affecting water availability and allocation. Finally, quantification and optimized allocation of water was done based on needs for hydropower, irrigation for agriculture, water supply, and storage evacuation for flood control. Results revealed that water supply potential increased by 69%, average agricultural yield improved by 36%, and hydropower generation increased by 54% and 66% at the upstream and downstream dams respectively. Lessons learned from this study may help provide a robust and practical means of water resources management in similar river basins and multi-reservoir systems.
Water management challenges at Mushandike irrigation scheme in Runde catchment, Zimbabwe
NASA Astrophysics Data System (ADS)
Malanco, Jose A.; Makurira, Hodson; Kaseke, Evans; Gumindoga, Webster
2018-05-01
Mushandike Irrigation Scheme, constructed in 1939, is located in Masvingo District and is one of the oldest irrigation schemes in Zimbabwe. Since 2002, the scheme has experienced severe water shortages resulting in poor crop yields. The low crop yields have led to loss of income to the smallholder farmers who constitute the irrigation scheme leading to water conflicts. The water stress at the scheme has been largely attributed to climate change and the uncontrolled expansion of the land under irrigation which is currently about 1000 ha against a design area of 613 ha. This study sought to determine the actual causes of water shortage at Mushandike Irrigation Scheme. Hydro-climatic data was analysed to establish if the Mushandike River system generates enough water to guarantee the calculated annual yield of the dam. Irrigation demands and efficiencies were compared against water availability and dam releases to establish if there is any deficit. The Spearman's Rank Correlation results of 0.196 for rainfall and 0.48 for evaporation confirmed positive but insignificant long-term changes in hydro-climatic conditions in the catchment. Water budgets established that the yield of the dam of 9.2 × 106 m3 year-1 is sufficient to support the expanded area of 1000 ha provided in-field water management efficiencies are adopted. The study concludes that water shortages currently experienced at the scheme are a result of inefficient water management (e.g. over-abstraction from the dam beyond the firm yield, adoption of inefficient irrigation methods and high channel losses in the canal system) and are not related to hydro-climatic conditions. The study also sees no value in considering inter-basin water transfer to cushion the losses being experienced at the scheme.
East, Amy E.; Collins, Brian D.; Sankey, Joel B.; Corbett, Skye C.; Fairley, Helen C.; Caster, Joshua J.
2016-05-17
We conclude that most of the river-corridor archeological sites are at elevated risk of net erosion under present dam operations. In the present flow regime, controlled floods do not simulate the magnitude or frequency of natural floods, and are not large enough to deposit sand at elevations that were flooded at annual to decadal intervals in predam time. For archeological sites that depend upon river-derived sand, we infer elevated erosion risk owing to a combination of reduced sand supply (both fluvial and aeolian) through (1) the lower-than-natural flood magnitude, frequency, and sediment supply of the controlled-flooding protocol; (2) reduction of open, dry sand area available for wind redistribution under current normal (nonflood) dam operations, which do not include flows as low as natural seasonal low flows and do include substantial daily flow fluctuations; and (3) impeded aeolian sand entrainment and transport owing to increased riparian vegetation growth in the absence of larger, more-frequent floods. If dam operations were to increase the supply of sand available for windblown transport—for example, through larger floods, sediment augmentation, or increased fluvial sandbar exposure by low flows—and also decrease riparian vegetation, the prevalence of active aeolian sand could increase over time, and the propensity for unmitigated gully erosion could decrease. Although the evolution of river-corridor landscapes and archeological sites has been altered fundamentally by the lack of large, sediment-rich floods (flows on the order of 5,000 m3/s), some combination of sediment-rich flows above 1,270 m3/s, seasonal flows below 226 m3/s, and riparian-vegetation removal might increase the preservation potential for sand-dependent archeological resources in the Colorado River corridor.
Briody, Alyse C.; Robertson, Andrew J.; Thomas, Nicole
2016-03-22
Seepage investigations have been conducted annually by the U.S. Geological Survey from 1988 to 1998 and from 2004 to the present (2014) along a 64-mile reach of the Rio Grande from below Leasburg Dam, Leasburg, New Mexico, to above American Dam, El Paso, Texas, as part of the Mesilla Basin monitoring program. Results of the investigation conducted in 2014 are presented in this report. The 2014 seepage investigation was conducted on February 11, 2014, during the low-flow conditions of the non-irrigation season. During the 2014 investigation, discharge was measured at 23 sites along the main-stem Rio Grande and 19 inflow sites within the study reach. Because of extended drought conditions affecting the basin, many sites along the Rio Grande (17 main-stem and 9 inflow) were observed to be dry in February 2014. Water-quality samples were collected during the seepage investigation at sites with flowing water as part of a long-term monitoring effort in the region.Net seepage gain or loss was computed for each subreach (the interval between two adjacent measurement locations along the river) by subtracting the discharge measured at the upstream location from the discharge measured at the closest downstream location along the river and then subtracting any inflow to the river within the subreach. An estimated gain or loss was determined to be meaningful when it exceeded the cumulative measurement uncertainty associated with the net seepage computation. The cumulative seepage loss in the 64-mile study reach in 2014 was 16.0 plus or minus 2.9 cubic feet per second.
Rubin, Stephen P.; Miller, Ian M.; Elder, Nancy; Reisenbichler, Reginald R.; Duda, Jeffrey J.; Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.
2011-01-01
(3–18 m) near the mouth of the Elwha River, between the west end of Freshwater Bay and the base of Ediz Hook, were surveyed in August and September 2008, to establish baselines prior to dam removal. Density was estimated for 9 kelp taxa, 65 taxa of invertebrates larger than 2.5 cm any dimension and 24 fish taxa. Density averaged over all sites was 3.1 per square meter (/m2) for kelp, 2.7/m2 for invertebrates, and 0.1/m2 for fish. Community structure was partly controlled by substrate type, seafloor relief, and depth. On average, 12 more taxa occurred where boulders were present compared to areas lacking boulders but with similar base substrate. Four habitat types were identified: (1) Bedrock/boulder reefs had the highest kelp density and taxa richness, and were characterized by a canopy of Nereocystis leutkeana (bull kelp) at the water surface and a secondary canopy of perennial kelp 1–2 m above the seafloor; (2) Mixed sand and gravel-cobble habitats with moderate relief provided by boulders had the highest density of invertebrates and a taxa richness nearly equivalent to that for bedrock/boulder reefs; (3) Mixed sand and gravel-cobble habitats lacking boulders supported a moderate density of kelp, primarily annual species with low growth forms (blades close to the seafloor), and the lowest invertebrate density among habitats; and (4) Sand habitats had the lowest kelp density and taxa richness among habitats and a moderate density of invertebrates. Uncertainties about nearshore community responses to increases in deposited and suspended sediments highlight the opportunity to advance scientific understanding by measuring responses following dam removal.
Regional Infant and Child Mortality Review Committee--2011 final report.
Wilson, Ann L; Sideras, James
2012-12-01
The 2011 annual report of the Regional Infant and Child Mortality Review Committee (RICMRC) is presented. Since 1997, the committee has reviewed 224 deaths to achieve its mission to "review infant and child deaths so that information can be transformed into action to protect young lives." In 2011, the committee reviewed 21 deaths (22 met the committee's criteria) of infants and children who were residents of Minnehaha, Turner, Lincoln, Hanson and Brookings counties in South Dakota. The manner of 12 of the reviewed deaths was natural with eight of these the result of progressive neurological diseases or conditions. In 2011 there were no deaths attributed to Sudden Infant Death Syndrome (SIDS), though there were two deaths of infants during sleep. One of these infants was ruled accidental as the baby died of aspiration and the other death occurred in an unsafe environment with its manner determined to be undecided. Six deaths were accidental, one of which occurred as a result of a fire in a home without functional smoke alarms. One motor vehicle death occurred, through no fault of the teen age driver. Another death resulted from tubing over a low head dam on the Big Sioux River. One youth suicide occurred to a resident of the region.
Emergency Fish Restoration Project; Final Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LeCaire, Richard
Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleyemore » (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.« less
Characteristics of depositional environments in the Nakdong River Estuary, South Korea
NASA Astrophysics Data System (ADS)
Woo, Han Jun; Lee, Jun-Ho; Kang, Jeongwon; Choi, Jae Ung
2017-04-01
Most of the major Korean estuaries, under high pressure from development, have dams with environmental problems, including restricted water circulation, low water quality, decreased biodiversity and wetland destruction. The Nakdong estuary on the southeastern coast of Korean Peninsula is an enclosed type with two large estuarine dams that were constructed in 1934 and between 1983 and 1987. The construction of dams has led to geomorphologic evolution of the barrier islands within Nakdong estuary. The estuary has been characterized as barrier-lagoon system with various subenvironments and microtidal with a 1.5 m tidal range. The sedimentary analyses and monitoring short-term sedimentation rates were investigated to understand characteristics of depositional environments in barrier-lagoon system of the Nakdong River Estuary. The surface sediments in the system were classified into three sedimentary facies in summer 2015. Generally, sand sediment was dominated in the seaward side of barrier islands and muddy sand sediment was dominated on the lagoon. Sandy mud and mud sediments were distributed in the tidal flat near Noksan industrial district and channels near dams. Fourteen a priori subenvironments were distinguished based on differences in landscape characterization (sediment texture, salinity, total organic carbon, pH and C/N ratios). The dendrogram resulting from cluster analysis of environmental variables from 14 a priori subenvironments could be clustered into 4 groups that were characterized by different sediment texture and hydrodynamic energy. The short-term sedimentation rates were obtained seasonally from three lines by burying a plate at sub-bottom depth from May 2015 to May 2016. The deposition was dominated on the tidal flat between mainland and Jinudo (JW- Line) and Sinjado (SJ-Line) with the net deposition rate of 10.09 mm/year and 12.38 mm/year, respectively. The erosion was dominated on the tidal flats at Eulsukdo (ES-Line) on the east side of the system with an annual erosion rate of -13.15 mm/year. Two 12.5-hours anchoring surveys at inlets were revealed that net suspended sediments were transported to the open sea during a tidal cycle in summer 2015 and 2016. The sedimentary processes of the anthropogenically altered barrier-lagoon system in Nakdong estuary showed that sediments transported into the lagoon through inlets during flood condition and moved to westward and deposited sediments on the tidal flat and channels near dams in low energy environments. In the east side of the system, sediments flowed out the sea with discharge from Nakdong Dam during ebb condition. These data will provide an important baseline for future assessments of environmental quality on dam open.
Gómez, Fernando
2003-06-01
The role of the Strait of Gibraltar on the exchanges of substances between Mediterranean Sea and the Atlantic Ocean is reviewed. The previous estimations have been recalculated by using a similar water flux and compared with the river and atmospheric inputs to the Western Mediterranean Sea. The man-induced changes in the dimensions of the Strait of Gibraltar increasing (planning the sill) or reducing of the cross-section by a total or partial dam are discussed. A total dam will control the sea-level rise in the Mediterranean Sea, but an annual increase of major nutrient concentrations of 1-2% could be expected, lower than the rate of increase of the river and atmospheric inputs in the Western Mediterranean Sea. The increase of the cross-section of the Strait by increasing the depth (planning) at the sill could compensate the increase of the external nutrient inputs.
Progress in Scientific and Technical Communications, 1968 Annual Report.
ERIC Educational Resources Information Center
Federal Council for Science and Technology, Washington, DC. Committee on Scientific and Technical Information.
This sixth annual report describes progress achieved by the Federal Government in improving the communication of scientific and technical information to support and enhance national science and technology. Included in the report are details regarding the scientific and technical activities of individual Federal Agencies, such as the Atomic Energy…
76 FR 11277 - Agency Information Collection Activities: Extension of a Currently Approved Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-01
...- Annual Progress Report for Grantees From the Grants To Support Tribal Domestic Violence and Sexual...-Annual Progress Report for Grantees from the Grants to Support Tribal Domestic Violence and Sexual... development and operation of new or existing nonprofit tribal domestic violence and sexual assault coalitions...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-24
... DEPARTMENT OF JUSTICE [OMB Number 1122-0024] Agency Information Collection Activities; Extension... Office of Management and Budget, Office of Information and Regulatory Affairs, Attention Department of...) approximately one hour to complete a semi-annual progress report. The semi-annual progress report is divided...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... DEPARTMENT OF JUSTICE [OMB Number 1122-0022] Agency Information Collection Activities; Extension..., Attention Department of Justice Desk Officer, Washington, DC 20503. Additionally, comments may be submitted...) approximately one hour to complete a semi-annual progress report. The semi-annual progress report is divided...
2014 Annual Progress Report: DOE Hydrogen and Fuel Cells Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-11-01
The 2014 Annual Progress Report summarizes fiscal year 2014 activities and accomplishments by projects funded by the DOE Hydrogen Program. It covers the program areas of hydrogen production and delivery; hydrogen storage; fuel cells; manufacturing; technology validation; safety, codes and standards; market transformation; and systems analysis.
COMPLIANCE STUDIES: WHAT ABOUT THE FISH?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodley, Christa M.; Fischer, Eric S.; Wagner, Katie A.
2013-08-21
ABSTRACT It is understood that operational and structural conditions at hydroelectric facilities along with environmental conditions of the migration corridors affect the passage conditions for fish. Hydropower fish survival assessments at the individual- and population-level have progressed over the past decade with development of turbine simulation software and improvements in telemetry systems, in particular, micro-transmitters, cabled and autonomous receivers, and advanced statistical designs that provide precise estimates of passage routes and dam-passage survival. However, these approaches often ignore fish condition as a variable in passage and survival analyses. To account for fish condition effects on survival results, compliance statistical modelsmore » often require increased numbers of tagged fish. For example, prior to and during migration, fish encounter numerous stressors (e.g., disease, predation, contact with structures, decompression events), all of which can cause physical and physiological stress, altering the probability of survival after passage through a dam or a series of dams. In addition, the effects of surgical transmitter implantation process or the transmitter itself may cause physiological stress, alter behavior, and/or decrease survival. Careful physiological evaluations can augment survival model assumptions, resultant data, and predictive scenarios. To exemplify this, surgeons concurrently noted fish condition and surgical implantation during a multi-dam compliance study in 2011. The analyses indicted that surgeon observations on fish condition and surgical outcomes were related to 24 h holding mortalities and fish that never detected after release. Short reach and long reach survival were related to surgical outcomes and fish condition, respectively.« less
Ecological studies of a regulated stream: Huntington River, Emery County, Utah
DOE Office of Scientific and Technical Information (OSTI.GOV)
Winget, R.N.
1984-04-30
A 36.9 x 10/sup 6/ m/sup 3/ reservoir constructed on Huntington River, Emery County, Utah, resulted in changes in physical habitat, water quality, temperature, and flow regime. The greatest changes in physical habitat resulted from: (1) sediment additions from dam and road construction plus erosion of reservoir basin during filling; and (2) changing stream flow from a spring high runoff regime to a moderated flow regime. Elimination of spring nutrient concentration peaks and overall reduction of total dissolved nutrient availability in the river plus moderate reductions in pH were the most apparent water quality changes below the reservoir. Water temperaturemore » changes were an increased diurnal and seasonal constancy, summer depression, and winter elevation, generally limited to a 10-12 km reach below the dam. Physical and chemical changes altered macroinvertebrate community structure, with changes greatest near the dam and progressively less as distance downstream increased. Below the dam: (1) more environmentally tolerant taxa increased their dominance; (2) relative numbers of smaller sized individuals increased in relation to larger individuals; and (3) filter feeding, collector/gatherers, and scapers gained an advantage over shredders. Macroinvertebrate taxa with small instar larvae present from late summer to early fall were negatively impacted by the unnaturally high July and August flows. The reservoir became a physical barrier to downstream larval drift and upcanyon and downcanyon immigration of adults, resulting in reduced numbers of several species above and below the reservoir. 50 references, 12 figures, 3 tables.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knotek, W.Ladd; Deleray, Mark; Marotz, Brian L.
1997-08-01
In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery ofmore » fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tiffan, Kenneth F.; Rondorf, Dennis W.
This report summarizes results of research activities conducted in 1999 and years previous. In an effort to provide this information to a wider audience, the individual chapters in this report have been submitted as manuscripts to peer-reviewed journals. These chapters communicate significant findings that will aid in the management and recovery of fall chinook salmon in the Columbia River Basin. Abundance and timing of seaward migration of Snake River fall chinook salmon was indexed using passage data collected at Lower Granite Dam for five years. We used genetic analyses to determine the lineage of fish recaptured at Lower Granite Dammore » that had been previously PIT tagged. We then used discriminant analysis to determine run membership of PIT-tagged smolts that were not recaptured to enable us to calculate annual run composition and to compared early life history attributes of wild subyearling fall and spring chinook salmon. Because spring chinook salmon made up from 15.1 to 44.4% of the tagged subyearling smolts that were detected passing Lower Granite Dam, subyearling passage data at Lower Granite Dam can only be used to index fall chinook salmon smolt abundance and passage timing if genetic samples are taken to identify run membership of smolts. Otherwise, fall chinook salmon smolt abundance would be overestimated and timing of fall chinook salmon smolt passage would appear to be earlier and more protracted than is the case.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochnauer, Tim; Claire, Christopher
2009-05-07
Pacific lamprey Lampetra tridentata have received little attention in fishery science until recently, even though abundance has declined significantly along with other anadromous fish species in Idaho. Pacific lamprey in Idaho have to navigate over eight lower Snake River and Columbia River hydroelectric facilities for migration downstream as juveniles to the Pacific Ocean and again as adults migrating upstream to their freshwater spawning grounds in Idaho. The number of adult Pacific lamprey annually entering the Snake River basin at Ice Harbor Dam has declined from an average of over 18,000 during 1962-1969 to fewer than 600 during 1998-2006. Based onmore » potential accessible streams and adult escapement over Lower Granite Dam on the lower Snake River, we estimate that no more than 200 Pacific lamprey adult spawners annually utilize the Clearwater River drainage in Idaho for spawning. We utilized electrofishing in 2000-2006 to capture, enumerate, and obtain biological information regarding rearing Pacific lamprey ammocoetes and macropthalmia to determine the distribution and status of the species in the Clearwater River drainage, Idaho. Present distribution in the Clearwater River drainage is limited to the lower sections of the Lochsa and Selway rivers, the Middle Fork Clearwater River, the mainstem Clearwater River, the South Fork Clearwater River, and the lower 7.5 km of the Red River. In 2006, younger age classes were absent from the Red River.« less
Dechow, C D; Rogers, G W
2018-05-01
Expectation of genetic merit in commercial dairy herds is routinely estimated using a 4-path genetic selection model that was derived for a closed population, but commercial herds using artificial insemination sires are not closed. The 4-path model also predicts a higher rate of genetic progress in elite herds that provide artificial insemination sires than in commercial herds that use such sires, which counters other theoretical assumptions and observations of realized genetic responses. The aim of this work is to clarify whether genetic merit in commercial herds is more accurately reflected under the assumptions of the 4-path genetic response formula or by a genetic lag formula. We demonstrate by tracing the transmission of genetic merit from parents to offspring that the rate of genetic progress in commercial dairy farms is expected to be the same as that in the genetic nucleus. The lag in genetic merit between the nucleus and commercial farms is a function of sire and dam generation interval, the rate of genetic progress in elite artificial insemination herds, and genetic merit of sires and dams. To predict how strategies such as the use of young versus daughter-proven sires, culling heifers following genomic testing, or selective use of sexed semen will alter genetic merit in commercial herds, genetic merit expectations for commercial herds should be modeled using genetic lag expectations. Copyright © 2018 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.
Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warf, Don; Livingston, Scott
2009-04-16
In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less
Umatilla River Fish Passage Operations Program, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronson, James P.; Duke, Bill B.
2005-08-01
Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 19, 2003 to July 8, 2004. A total of 3,388 summer steelhead (Oncorhynchus mykiss); 1,482 adult, 638 jack, and 2,150 subjack fall chinook (O. tshawytscha); 8,319 adult and 667 jack coho (O. kisutch); and 2,965 adult and 270 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 34 summer steelhead and 31more » adult and 9 jack spring chinook were hauled upstream from Threemile Dam. There were 3,166 summer steelhead; 1,076 adult, 554 jack and 2,026 subjack fall chinook; 8,213 adult and 647 jack coho; and 2,152 adult and 174 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 121 summer steelhead; 388 adult and 19 jack fall chinook; and 561 adult and 29 jack spring chinook were collected for brood. In addition, 239 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. There were also 25 pair hatchery steelhead adults collected for the progeny maker study. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 184 days between January 12 and July 6, 2004. During that period, fish were bypassed back to the river 173 days and were trapped 10 days. An estimated 44 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 84% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on February 10, 2004 for outmigration sampling and continued until July 7, 2004 when sampling was discontinued. The juvenile bypass ran at the 5 cfs level until the initiation of Phase I on August 15, 2004. The juvenile trap was operated by the Oregon Department of Fish and Wildlife (ODFW) under the Evaluation of Umatilla Juvenile Salmonid Outmigration Project.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wielgus, Robert B.; Shipley, Lisa
2002-07-01
Construction of the Grand Coulee and Chief Joseph dams has resulted in inundation and loss of 29,125 total habitat units for mule deer and irrigation agriculture in many parts the Intermountain Province (IM) of the Columbia Basin. Mule deer in the Shrub-Steppe are ranked high priority target species for mitigation and management and are declining in most portions of the subbasins of the IM. Reasons for the decline are unknown but believed to be related to habitat changes resulting from dams and irrigation agriculture. White-tailed deer are not ranked as target species and are believed to be increasing throughout themore » basin because of habitat changes brought about by the dams and irrigation agriculture. Recent research (1997-2000) in the NE IM and adjacent Canadian portions of the Columbia Basin (conducted by this author and funded by the Columbia Basin Fish & Wildlife Compensation Program B.C.), suggest that the increasing white-tailed deer populations (because of dams and irrigation agriculture) are resulting in increased predation by cougars on mule deer (apparent competition or alternate prey hypothesis). The apparent competition hypothesis predicts that as alternate prey (white-tailed deer) densities increase, so do densities of predators, resulting in increased incidental predation on sympatric native prey (mule deer). Apparent competition can result in population declines and even extirpation of native prey in some cases. Such a phenomenon may account for declines of mule deer in the IM and throughout arid and semi-arid West where irrigation agriculture is practiced. We will test the apparent competition hypothesis by conducting a controlled, replicated ''press'' experiment in at least 2 treatment and 2 control areas of the IM subbasins by reducing densities of white-tailed deer and observing any changes in cougar predation on mule deer. Deer densities will be monitored by WADFW personnel using annual aerial surveys and/or other trend indices. Predation rates and population growth rates of deer will be determined using radio telemetry. Changes in cougar functional (kills/unit time), aggregative (cougars/unit area), numerical (offspring/cougar), and total (predation rate) responses on deer will also be monitored using radio telemetry. The experiment will be conducted and completed over a period of 5 years. Results will be used to determine the cause and try to halt the mule deer population declines. Results will also guide deer mitigation and management in the IM and throughout the North American West.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wielgus, Robert; Shipley, Lisa; Myers, Woodrow
2003-09-01
Construction of the Grand Coulee and Chief Joseph dams has resulted in inundation and loss of 29,125 total habitat units for mule deer and irrigation agriculture in many parts the Intermountain Province (IM) of the Columbia Basin. Mule deer in the Shrub-Steppe are ranked high priority target species for mitigation and management and are declining in most portions of the sub basins of the IM. Reasons for the decline are unknown but believed to be related to habitat changes resulting from dams and irrigation agriculture. White-tailed deer are believed to be increasing throughout the basin because of habitat changes broughtmore » about by the dams and irrigation agriculture. Recent research (1997-2000) in the NE IM and adjacent Canadian portions of the Columbia Basin (conducted by this author and funded by the Columbia Basin Fish & Wildlife Compensation Program B.C.), suggest that the increasing white-tailed deer populations (because of dams and irrigation agriculture) are resulting in increased predation by cougars on mule deer (apparent competition or alternate prey hypothesis). The apparent competition hypothesis predicts that as alternate prey (white-tailed deer) densities increase, so do densities of predators, resulting in increased incidental predation on sympatric native prey (mule deer). Apparent competition can result in population declines and even extirpation of native prey in some cases. Such a phenomenon may account for declines of mule deer in the IM and throughout arid and semi-arid West where irrigation agriculture is practiced. We will test the apparent competition hypothesis by conducting a controlled, replicated 'press' experiment in at least 2 treatment and 2 control areas of the IM sub basins by reducing densities of white-tailed deer and observing any changes in cougar predation on mule deer. Deer densities will be monitored by WADFW personnel using annual aerial surveys and/or other trend indices. Predation rates and population growth rates of deer will be determined using radio telemetry. Changes in cougar functional (kills/unit time), aggregative (cougars/unit area), numerical (offspring/cougar), and total (predation rate) responses on deer will also be monitored using radio telemetry. The experiment will be conducted and completed over a period of 5 years. Results will be used to determine the cause and try to halt the mule deer population declines. Results will also guide deer mitigation and management in the IM and throughout the North American West.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
... Collection; Semi- Annual Progress Report for Grantees from the Children and Youth Exposed to Violence Program... Violence Against Women (OVW) will be submitting the following information collection request to the Office... Violence Program. (3) Agency form number, if any, and the applicable component of the Department of Justice...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... incidences of sexual assault, domestic violence, dating violence, or stalking. (5) An estimate of the total... collection Semi- Annual Progress Report for Grantees from the Children and Youth Exposed to Violence Program... Violence Against Women (OVW) will be submitting the following information collection request to the Office...
2015 Annual Progress Report: DOE Hydrogen and Fuel Cells Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The 2015 Annual Progress Report summarizes fiscal year 2015 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; and market transformation.
Annual changes in radiographic indices of the spine in cerebral palsy patients.
Lee, Seung Yeol; Chung, Chin Youb; Lee, Kyoung Min; Kwon, Soon-Sun; Cho, Kyu-Jung; Park, Moon Seok
2016-03-01
We estimated the annual changes in radiographic indices of the spine in cerebral palsy (CP) patients and analyzed the factors that influence its progression rate. We included CP patients who had undergone whole-spine radiography more than twice and were followed for at least 1 year. The scoliosis Cobb angle, coronal balance, apical vertebral translation, apical rotation, and pelvic obliquity were measured on anteroposterior (AP) radiographs; thoracic kyphosis and lumbar lordosis angles, and sagittal balance was measured on lateral radiographs; and migration percentage was measured on AP hip radiographs to determine hip instability. For each gross motor function classification system (GMFCS) level, the Cobb angles, apical vertebral translation, coronal and sagittal balance, and pelvic obliquity were adjusted by multiple factors with a linear mixed model. A total of 184 patients (774 radiographs) were included in this study. There was no significant annual change in scoliosis Cobb, thoracic kyphosis, and lumbar lordosis angles in the GMFCS level I-II and III groups. In the GMFCS level IV-V group, there was an annual increase of 3.4° in the scoliosis Cobb angle (p = 0.020). The thoracic kyphosis angle increased by 2.2° (p = 0.018) annually in the GMFCS level IV-V group. Apical vertebral translation increased by 5.4 mm (p = 0.029) annually in the GMFCS level IV-V group. Progression of coronal and sagittal balance and pelvic obliquity with aging were not statistically significant. Sex, hip instability, hip surgery, and triradiate cartilage did not affect the progression of scoliosis and the balance of the spine and pelvis. The scoliosis Cobb angle, thoracic kyphosis angle, and apical vertebral translation in the GMFCS level IV-V CP patients progressed with age. These findings can predict radiographic progression of scoliosis in CP patients.
Proceedings of the 2011 Elwha River Science Symposium
Barbero, Kiley; Morrow, Tara; Shaffer, Anne; Duda, Jeffrey J.; Jenkins, Kurt J.; Blackie, Barbara; Lear, Cathy
2011-01-01
Many of the scientists working on the Elwha project have regularly met, since around 2004, for annual meetings. Loosely organized under the auspices of the Elwha Research and Elwha Nearshore consortia, the annual meetings have been informative for many reasons, including the sharing of study plans, field schedules, and preliminary results. It has been a great way for groups of physical scientists and groups of biologists to learn about the questions of interest to each group and to explore areas of overlap. In some cases, these meetings have spawned new collaborations, synergies, and research directions. In planning for the 2011 Elwha River Science Symposium, we sought to retain this espirit de corps, but realized that the start of dam removal heralded an important new phase of the project and called for an event that celebrated this special occasion.
Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2005-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less
Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2006-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
2016 Annual Progress Report: DOE Hydrogen and Fuel Cells Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The 2016 Annual Progress Report summarizes fiscal year 2016 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; market transformation; and Small Business Innovation Research projects.
ERIC Educational Resources Information Center
Florida Department of Education, 2014
2014-01-01
This Annual Measurable Objective (AMO) is designed to keep Florida moving forward toward national and international competitiveness. Florida will compare its National Assessment of Educational Progress (NAEP) scores to those of the top five states and its Trends in International Mathematics and Science Study (TIMSS), Progress in International…
ERIC Educational Resources Information Center
Coastal Bend Migrant Council, Mathis, TX. San Patricio Migrant Health Center.
The annual medical progress report covers migrant health services in San Patricio County, Texas, from February 1, 1973 to January 31, 1974. The report discusses: staff, administration, cardiology, dental services, health services, medical services, outreach and environmental health services, prescription services, registration and identification,…
FLORIDA MIGRANT HEALTH PROJECT. FOURTH ANNUAL PROGRESS REPORT, 1966-1967.
ERIC Educational Resources Information Center
Florida State Board of Health, Jacksonville.
THE FOURTH ANNUAL PROGRESS REPORT OF THE FLORIDA MIGRANT HEALTH PROJECT INDICATES THAT IN 1966-67 THERE WAS AN APPRECIABLE INCREASE IN THE AMOUNT AND VARIETY OF MIGRANT HEALTH SERVICES RENDERED, THE NUMBER OF MIGRANTS CONTACTED, AND THE ACTIVITIES PERFORMED BY PROJECT PERSONNEL. MIGRANT HEALTH SERVICE REFERRALS INCREASED BY 1,222 OVER THE SAME…
Maupin, Molly A.
1995-01-01
Idaho leads the Nation in trout production for commercial sale. Combined mean annual discharges from 12 aquacultural facilities in the basin (1985-90) were about 787,000 acre-feet. These facilities are clustered in a reach of the Snake River between Milner Dam and King Hill where ground-water discharge is from many seeps and springs that provide sufficient quantities of good-quality water. Other facilities that release effluent to the Snake River include 13 municipal wastewater treatment plants and 3 industrial facilities.
17. Photographic copy of photograph. Location unknown but assumed to ...
17. Photographic copy of photograph. Location unknown but assumed to be uper end of canal. Features no longer extant. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. MAIN (TITLED FLORENCE) CANAL, WASTEWAY, SLUICEWAY, & BRIDGE, 1/26/25. - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ
Flood Control Burlington Dam, Souris River, North Dakota. Final Environment Impact Statement.
1978-01-01
runoft would also be held at 500 cfs.) After spring runoff , the Lake Darling pool would be lowered to elevation 1596.0 at which point the USFWS would...highly variable, with annual runoff at Minot ranging from a low of 940 acre-feet in 1931 and 1937 to a high of 801,000 acre-feet in 1976. Flows are usually...greatest In April and May due to runoff from snowmelt and 1;utlrai 6prlni ,i. Flowq are generally very low during fall and winter with periods of no
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, R.; McKinstry, C.; Cook, C.
This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings frommore » the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville Tribal Fisheries. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions.« less
Changes in sediment volume in Alder Lake, Nisqually River Basin, Washington, 1945-2011
Czuba, Jonathan A.; Olsen, Theresa D.; Czuba, Christiana R.; Magirl, Christopher S.; Gish, Casey C.
2012-01-01
The Nisqually River drains the southwest slopes of Mount Rainier, a glaciated stratovolcano in the Cascade Range of western Washington. The Nisqually River was impounded behind Alder Dam when the dam was completed in 1945 and formed Alder Lake. This report quantifies the volume of sediment deposited by the Nisqually and Little Nisqually Rivers in their respective deltas in Alder Lake since 1945. Four digital elevation surfaces were generated from historical contour maps from 1945, 1956, and 1985, and a bathymetric survey from 2011. These surfaces were used to compute changes in sediment volume since 1945. Estimates of the volume of sediment deposited in Alder Lake between 1945 and 2011 were focused in three areas: (1) the Nisqually River delta, (2) the main body of Alder Lake, along a 40-meter wide corridor of the pre-dam Nisqually River, and (3) the Little Nisqually River delta. In each of these areas the net deposition over the 66-year period was 42,000,000 ± 4,000,000 cubic meters (m3), 2,000,000 ± 600,000 m3, and 310,000 ± 110,000 m3, respectively. These volumes correspond to annual rates of accumulation of 630,000 ± 60,000 m3/yr, 33,000 ± 9,000 m3/yr, and 4,700 ± 1,600 m3/yr, respectively. The annual sediment yield of the Nisqually (1,100 ± 100 cubic meters per year per square kilometer [(m3/yr)/km2]) and Little Nisqually River basins [70 ± 24 (m3/yr)/km2] provides insight into the yield of two basins with different land cover and geomorphic processes. These estimates suggest that a basin draining a glaciated stratovolcano yields approximately 15 times more sediment than a basin draining forested uplands in the Cascade Range. Given the cumulative net change in sediment volume in the Nisqually River delta in Alder Lake, the total capacity of Alder Lake since 1945 decreased about 3 percent by 1956, 8 percent by 1985, and 15 percent by 2011.
Colville Tribal Fish Hatchery, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arteburn, John; Christensen, David
2003-03-01
Federal hydropower projects as well as private power utility systems have had a major negative impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas have been completely blocked to anadromous fish by dams, destroying the primary food resource (salmon) for many native people forcing them to rely heavily upon resident fish to replace these lost resources. The Colville Tribal Fish Hatchery is an artificial production program that addresses the loss of anadromous fish resources in the Upper Columbia Sub-Region within the ''blocked area'' created by the construction of Chief Joseph and Grandmore » Coulee Dams. This project enhances resident fisheries located in the Intermountain and Columbia Cascade Provinces, specifically within the Colville Reservation portion of the Upper Columbia, SanPoil and Oakanogan Sub-Basins. The project partially mitigates for anadromous fish losses through protection/augmentation of resident fish populations to enhance fishery potential (i.e. in-place, out-of-kind mitigation) pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 and the hatchery was completed in 1990. The Colville Tribal Hatchery (CTH) is located on the northern bank of the Columbia River just down stream of the town of Bridgeport, Washington that is just down stream of Chief Joseph Dam. The hatchery is located on land owned by the Colville Tribes. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout annually. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence/recreational fishery for Colville Tribal members and provide for a successful nonmember sport fishery. The majority of the fish distributed from the facility are intended to support ''carry-over'' fisheries. Fish produced at the facility are intended to be of sufficient quality and quantity to meet specific monitoring and evaluation goals and objectives outlines in the 2002 statement of work (SOW).« less
Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronson, James P.
2004-12-01
In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survivalmore » of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported adult spring chinook from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. A total of 239 spring chinook were outplanted in August for natural spawning in the basin.« less
Regional flood frequency analysis in Triveneto (Italy): climate and scale controls
NASA Astrophysics Data System (ADS)
Persiano, Simone; Castellarin, Attilio; Domeneghetti, Alessio; Brath, Armando
2016-04-01
The growing concern about the possible effects of climate change on flood frequency regime is leading Authorities to review previously proposed procedures for design-flood estimation, such as national regionalization approaches. Our study focuses on the Triveneto region, a broad geographical area in North-eastern Italy consisting of the administrative regions of Trentino-Alto Adige, Veneto and Friuli-Venezia Giulia. A reference procedure for design flood estimation in Triveneto is available from the Italian NCR research project "VA.PI.", which developed a regional model using annual maximum series (AMS) of peak discharges that were collected up to the 80s by the former Italian Hydrometeorological Service. We consider a very detailed AMS database that we recently compiled for ~80 catchments located in Triveneto. Our dataset includes the historical data mentioned above, together with more recent data obtained from Regional Services and annual maximum peak streamflows extracted from inflow series to artificial reservoirs and provided by dam managers. All ~80 study catchments are characterized in terms of several geomorphologic and climatic descriptors. The main objectives of our study are: (1) to check whether climatic and scale controls on flood frequency regime in Triveneto are similar to the controls that were recently found in Europe; (2) to verify the possible presence of trends as well as abrupt changes in the intensity and frequency of flood extremes by looking at changes in time of regional L-moments of annual maximum floods; (3) to assess the reliability and representativeness of the reference procedure for design flood estimation relative to flood data that were not included in the VA.PI. dataset (i.e. more recent data collected after the 80s and historical data provided by dam managers); (4) to develop an updated reference procedure for design flood estimation in Triveneto by using a focused-pooling approach (i.e. Region of Influence, RoI).
Hydrology and geomorphology of the Snake River in Grand Teton National Park
Nelson, Nicholas C.; Schmidt, John C.
2007-01-01
Flood magnitudes have decreased throughout the study area as a result of regulation, but these decreases are mitigated downstream from tributaries. Dam operations have not resulted in long-term progressive channel change or the development and abandonment of floodplain deposits. However, channel change is now dependant on the frequency of high-magnitude floods, and the frequency with which the two floodplains are inundated has been reduced.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-08-01
This is the eighth compilation of annual reports for the Navy's ELF Communications Systems Ecological Monitoring Program. The reports document the progress of eight studies performed during 1989 near the Naval Radio Transmitting Facility -- Republic, Michigan. The purpose of the monitoring is to determine whether electromagnetic fields produced by the ELF Communications System will affect resident biota or their ecological relationships. Soil Amoeba: Arthropoda and Earthworms: Pollinating Insects: Small Mammals and Nesting Birds.
Evrard, Olivier; Chartin, Caroline; Onda, Yuichi; Lepage, Hugo; Cerdan, Olivier; Lefèvre, Irène; Ayrault, Sophie
2014-04-03
Summer typhoons and spring snowmelt led to the riverine spread of continental Fukushima fallout to the coastal plains of Northeastern Japan and the Pacific Ocean. Four fieldwork campaigns based on measurement of radioactive dose rates in fine riverine sediment that has recently deposited on channel bed-sand were conducted between November 2011 and May 2013 to document the spread of fallout by rivers. After a progressive decrease in the fresh riverine sediment doses rates between 2011 and early spring in 2013, a fifth campaign conducted in November 2013 showed that they started to increase again after the occurrence of violent typhoons. We show that this increase in dose rates was mostly due to remobilization of contaminated material that was temporarily stored in river channels or, more importantly, in dam reservoirs of the region during the typhoons. In addition, supply of particles from freshly eroded soils in autumn 2013 was the most important in areas where decontamination works are under progress. Our results underline the need to monitor the impact of decontamination works and dam releases in the region, as they may provide a continuous source of radioactive contamination to the coastal plains and the Pacific Ocean during the coming years.
Water quality effects of seepage from earthen dams
Yost, C.; Naney, J.W.
1974-01-01
Analyses of surface and seepage waters from selected floodwater retarding structures in west-central Oklahoma, U.S.A. show the salinity of seepage to be several times greater than that of the impounded waters. The increases in concentration of the several chemical components are not proportional. This phenomenon appears to be caused largely by simple solution, which is closely related to the chemical character of the geologic formation that provides the reservoir site and the earth fill of the dam. Concentration of certain chemical components in the seepage water progressively decreases as the structure ages. This is probably a function of depletion, which is related to the amounts and solubility of the parent materials subjected to solution. In contrast, the concentration of certain other components, such as iron and calcium, increases with time. The chemical activities within the accumulating mud on the bottom of the reservoir apparently cause these increases. ?? 1974.
NASA Astrophysics Data System (ADS)
Marks, A. M.
2010-12-01
Fifty percent of the world’s population depends upon groundwater as their main source of drinking water (Hirata et al., 2007). Scarcity of groundwater clearly affects the entire world. One quarter of the world’s people live in areas characterized by physical water scarcity, making competition for water resources intense (International Water Management Institute (IWMI), 2006; World Water Council, 2008). Tools that forecast groundwater levels have been progressively developed over time, from the Boussinesq equation in 1871 to present day. However, complex three dimensional numerical flow models are the standard for determining groundwater behavior in most settings. These often require excessive field work, data collection, expense, and computational expertise. Artificial Neural Networks (ANNs) have been successfully used in other disciplines as a more practical and cost effective alternative for predicting outcomes dependant on multiple, complex, varying inputs. This research investigates the utility of ANNs to forecast groundwater levels from common data acquired on national data bases. Around Missoula in west central Montana, groundwater levels play an important role especially in the East Missoula and Turah areas, since groundwater levels were recently affected by the removal of the 28 ft Milltown Dam. The dam had impounded contaminated sediments which were polluting the Clark Fork River and nearby wells. Prior to dam removal engineers lowered the reservoir by 12 feet to examine the submerged portion of the dam. Water levels declined in wells during this initial drawdown and local citizens reported dry wells. This prompted a one million dollar well replacement response by the EPA to proactively protect water supplies in the 500+ domestic wells proximal to the reservoir. ANN’s can be an invaluable tool for forecasting groundwater behavior and have been successful for predicting groundwater levels within a foot of observed levels in several Milltown wells.
Forecasting the Cumulative Impacts of Dams on the Mekong Delta: Certainties and Uncertainties
NASA Astrophysics Data System (ADS)
Kondolf, G. M.; Rubin, Z.; Schmitt, R. J. P.
2016-12-01
The Mekong River basin is undergoing rapid hydroelectric development, with 7 large mainstem dams on the upper Mekong (Lancang) River in China and 133 dams planned for the Lower Mekong River basin (Laos, Cambodia, Thailand, Vietnam), 11 of which are on the mainstem. Prior analyses have shown that all these dams built as initially proposed would trap 96% of the natural sediment load to the Mekong Delta. Such a reduction in sediment supply would compromise the sustainability of the delta itself, but there are many uncertainties in the timing and pattern of land loss. The river will first erode in-channel sediment deposits, partly compensating for upstream sediment trapping until these deposits are exhausted. Other complicating factors include basin-wide accelerated land-use change, road construction, instream sand mining, dyking-off floodplains, and changing climate, accelerated subsidence from groundwater extraction, and sea level rise. It is certain that the Mekong Delta will undergo large changes in the coming decades, changes that will threaten its very existence. However, the multiplicity of compounding drivers and lack of good data lead to large uncertainties in forecasting changes in the sediment balance on the scale of a very large network. We quantify uncertainties in available data and consider changes due to additional, poorly quantified drivers (e.g., road construction), putting these drivers in perspective with the overall sediment budget. We developed a set of most-likely scenarios and their implications for the delta's future. Uncertainties are large, but there are certainties about the delta's future. If its sediment supply is nearly completely cut off (as would be the case with `business-as-usual' ongoing dam construction and sediment extraction), the Delta is certainly doomed to disappear in the face of rising seas, subsidence, and coastal erosion. The uncertainty is only when and how precisely the loss will progress.
Physical characterization of the Guadiana Estuary using the hydrodynamic model MOHID
NASA Astrophysics Data System (ADS)
Concepción Calero, María; García-Lafuente, Jesús; Garel, Erwan; Delgado-Cabello, Javier; Moreno-Navas, Juan; Martins, Flávio
2017-04-01
Guadiana Estuary is an intertidal estuary situated in SW of Iberian Peninsula, the latest 50 Km of which constitutes the natural border between Spain and Portugal. Tidal influence extends to about 80 Km upstream. The Guadiana River presents a high seasonal irregularity with wet winters and dry summers. Recently the river flow has been modified drastically by several dams constructed along the river. One of them is the Alqueva dam, opened in 2002, which is the biggest reservoir in Western Europe. It is placed to 120 Km upstream from the mouth of the estuary and is the last water control in the system being the main dam affecting the flow. A hydrodynamic model based on the MOHID system has been developed to study the hydrodynamics of the Guadiana Estuary. Tidal forcing and fresh water discharges were used in the boundary conditions. The model has been validated by comparing the model outcomes with in situ data measurements in several points along the estuary. Different scenarios have been simulated in order to know tidal progression and asymmetries in the circulation between wet and dry periods. Those phenomena are important because they influence the ecosystem and the distribution of sediments into the estuary and nearest coast. With a discharge of 300 m3/s the friction dominates over the amplification of the tide signal throughout the estuary while with smaller discharges the opposite effect occurs between 30 and 60 km. The difference in duration between floods and ebbs is greater the greater the discharge and the currents do not invert downstream at 50 Km with a discharge of 500 m3/s. Determining a regime of freshwater inputs from the Alqueva dam can be determinant to maintain the natural range of variation between dry and wet periods prior to the inauguration of the dam.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schilt, C.R.; Vu, P.D.; Nestler, J.M.
1995-12-31
At Richard B. Russell Dam on the Savannah River we have been monitoring the magnitude (numbers and masses) and species compositions as well as possible survival of fish entrained in operation of four 85 MW Francis pump turbines. In this paper we review our progress in net design for hydropower application. We also discuss basic net handling and introduce a method for net management in a very turbulent tailrace. This report is meant to share what we have learned at Russell Dam in hopes that it will facilitate similar efforts elsewhere. The commercial fishing industry has evolved methods of netmore » construction and handling that may be applied, with appropriate modification, at dams. The nets we use are most appropriately called trawls in that they have the form of a long sock placed over the penstock or draft tube. These nets are superficially similar to those used in commercial trawling for fish. Important differences are that: (1) the net remains relatively stationary while the water moves through it, not vice versa; (2) water velocities and turbulence are much greater at dams than in commercial fishing operations and (3) mesh sizes are much smaller for environmental sampling than for commercial trawling. And while a fouled trawl may stop the boat that pulls it, the water passed in generation or pumpback (about 140 ft. head at Russell) is for all practical purposes unstoppable. Our nets fish in a very turbulent discharge at 7,000 cu. ft./sec/turbine. Their strength and their ability to pass water effectively under all possible operating conditions are primary concerns. Trawl length, mesh sizes, and hanging ratios are important factors. Although we have had setbacks (usually in the form of torn nets) as this study has developed, we have incrementally improved our net design and handling. We review our net failures and the solutions we have found thus far in both construction and handling.« less
Assessment of smolt condition for travel time analysis. Annual report 1989
Beeman, J.W.; Rondorf, D.W.; Faler, J.C.; Free, M.E.; Haner, P.V.
1990-01-01
The Water Budget is a volume of water used to enhance environmental conditions (flows) in the Columbia and Snake rivers for juvenile salmonids during their seaward migration. To manage the Water Budget, the Fish Passage Center estimates travel times of juvenile salmonids in index reaches of the main-stem rivers, using information on river flows and the migrational characteristics of the juvenile salmonids. This study was initiated to provide physiological information on the juvenile salmonids used for these travel time estimates. The physiological ability to respond to stressors was evaluated by measuring concentrations of plasma cortisol, glucose, and chlorides before and after a 30-s handling-stress challenge test. As in 1988, most groups responded satisfactorily to the challenge. The scope for response was compromised among two groups of juvenile chinook salmon that were trucked to release sites and in steelhead from one hatchery after unusual marking and transportation protocols were used. The development of smoltification was assessed by measuring gill Na+-K+ ATPase activity and plasma thyroxine concentrations. Mean ATPase activities of marked hatchery groups of juvenile chinook salmon and steelhead changed little during the month before release and rose sharply for about the first 20 d of the migration after release. Mean plasma thyroxine was highest during the first 20 d after release. Mean gill ATPase activity of spring chinook salmon from the migration-at-large peaked at about the 90th percentile of passage at Rock Island and Lower Granite dams, and at about the 50th percentile of passage at McNary Dam. Mean gill ATPase activity of wild steelhead was higher than gill ATPase activity of hatchery steelhead at Rock Island Dam, the Snake River Trap, and Lower Granite Dam, but not at McNary Dam. This was attributed to a time-dependent relationship between increases in ATPase activity and the number of days fish migrated before recapture. Correlations of gill ATPase activity and/or plasma thyroxine concentrations with condition factor, morphology, or skin guanine concentration may be useful as non-lethal indicators of smoltification for inclusion in a smoltification index. Prevalence of bacterial kidney disease in spring chinook salmon was generally higher than in 1988, ranging from 81-100% using an enzyme-linked immunosorbent assay (ELISA) method. Fish from Snake River hatcheries had more severe infections than those from mid-Columbia hatcheries. The percentage of fish with severe infections was lower at two downstream dams than at the Snake River hatcheries of origin, suggesting a bias in dam collection facilities or that these fish ceased to migrate, either of which could lead to biases in travel time estimates.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true Statewide assessment; annual estimates; annual State goals and priorities; strategies; and progress reports. 361.29 Section 361.29 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false Statewide assessment; annual estimates; annual State goals and priorities; strategies; and progress reports. 361.29 Section 361.29 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE...
Weigel, K A; VanRaden, P M; Norman, H D; Grosu, H
2017-12-01
In the early 1900s, breed society herdbooks had been established and milk-recording programs were in their infancy. Farmers wanted to improve the productivity of their cattle, but the foundations of population genetics, quantitative genetics, and animal breeding had not been laid. Early animal breeders struggled to identify genetically superior families using performance records that were influenced by local environmental conditions and herd-specific management practices. Daughter-dam comparisons were used for more than 30 yr and, although genetic progress was minimal, the attention given to performance recording, genetic theory, and statistical methods paid off in future years. Contemporary (herdmate) comparison methods allowed more accurate accounting for environmental factors and genetic progress began to accelerate when these methods were coupled with artificial insemination and progeny testing. Advances in computing facilitated the implementation of mixed linear models that used pedigree and performance data optimally and enabled accurate selection decisions. Sequencing of the bovine genome led to a revolution in dairy cattle breeding, and the pace of scientific discovery and genetic progress accelerated rapidly. Pedigree-based models have given way to whole-genome prediction, and Bayesian regression models and machine learning algorithms have joined mixed linear models in the toolbox of modern animal breeders. Future developments will likely include elucidation of the mechanisms of genetic inheritance and epigenetic modification in key biological pathways, and genomic data will be used with data from on-farm sensors to facilitate precision management on modern dairy farms. Copyright © 2017 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.
Allawi, Mohammed Falah; Jaafar, Othman; Mohamad Hamzah, Firdaus; Abdullah, Sharifah Mastura Syed; El-Shafie, Ahmed
2018-05-01
Efficacious operation for dam and reservoir system could guarantee not only a defenselessness policy against natural hazard but also identify rule to meet the water demand. Successful operation of dam and reservoir systems to ensure optimal use of water resources could be unattainable without accurate and reliable simulation models. According to the highly stochastic nature of hydrologic parameters, developing accurate predictive model that efficiently mimic such a complex pattern is an increasing domain of research. During the last two decades, artificial intelligence (AI) techniques have been significantly utilized for attaining a robust modeling to handle different stochastic hydrological parameters. AI techniques have also shown considerable progress in finding optimal rules for reservoir operation. This review research explores the history of developing AI in reservoir inflow forecasting and prediction of evaporation from a reservoir as the major components of the reservoir simulation. In addition, critical assessment of the advantages and disadvantages of integrated AI simulation methods with optimization methods has been reported. Future research on the potential of utilizing new innovative methods based AI techniques for reservoir simulation and optimization models have also been discussed. Finally, proposal for the new mathematical procedure to accomplish the realistic evaluation of the whole optimization model performance (reliability, resilience, and vulnerability indices) has been recommended.
Drury, Douglas W.; Wade, Michael J.
2010-01-01
Hybrids from crosses between populations of the flour beetle, Tribolium castaneum, express varying degrees of inviability and morphological abnormalities. The proportion of allopatric population hybrids exhibiting these negative hybrid phenotypes varies widely, from 3% to 100%, depending upon the pair of populations crossed. We crossed three populations and measured two fitness components, fertility and adult offspring numbers from successful crosses, to determine how genes segregating within populations interact in inter-population hybrids to cause the negative phenotypes. With data from crosses of 40 sires from each of three populations to groups of 5 dams from their own and two divergent populations, we estimated the genetic variance and covariance for breeding value of fitness between the intra- and inter-population backgrounds and the sire × dam-population interaction variance. The latter component of the variance in breeding values estimates the change in genic effects between backgrounds owing to epistasis. Interacting genes with a positive effect, prior to fixation, in the sympatric background but a negative effect in the hybrid background cause reproductive incompatibility in the Dobzhansky-Muller speciation model. Thus, the sire × dam-population interaction provides a way to measure the progress toward speciation of genetically differentiating populations on a trait by trait basis using inter-population hybrids. PMID:21044199
Anning, David W.
2003-01-01
Stream properties and water-chemistry constituent concentrations from data collected by the National Water-Quality Assessment and other U.S. Geological Survey water-quality programs were analyzed to (1) assess water quality, (2) determine natural and human factors affecting water quality, and (3) compute stream loads for the surface-water resources in the Central Arizona Basins study area. Stream temperature, pH, dissolved-oxygen concentration and percent saturation, and dissolved-solids, suspended-sediment, and nutrient concentration data collected at 41 stream-water quality monitoring stations through water year 1998 were used in this assessment. Water-quality standards applicable to the stream properties and water-chemistry constituent concentration data for the stations investigated in this study generally were met, although there were some exceedences. In a few samples from the White River, the Black River, and the Salt River below Stewart Mountain Dam, the pH in reaches designated as a domestic drinking water source was higher than the State of Arizona standard. More than half of the samples from the Salt River below Stewart Mountain Dam and almost all of the samples from the stations on the Central Arizona Project Canal?two of the three most important surface-water sources used for drinking water in the Central Arizona Basins study area?exceeded the U.S. Environmental Protection Agency drinking water Secondary Maximum Contaminant Level for dissolved solids. Two reach-specific standards for nutrients established by the State of Arizona were exceeded many times: (1) the annual mean concentration of total phosphorus was exceeded during several years at stations on the main stems of the Salt and Verde Rivers, and (2) the annual mean concentration of total nitrogen was exceeded during several years at the Salt River near Roosevelt and at the Salt River below Stewart Mountain Dam. Stream properties and water-chemistry constituent concentrations were related to streamflow, season, water management, stream permanence, and land and water use. Dissolved-oxygen percent saturation, pH, and nutrient concentrations were dependent on stream regulation, stream permanence, and upstream disposal of wastewater. Seasonality and correlation with streamflow were dependant on stream regulation, stream permanence, and upstream disposal of wastewater. Temporal trends in streamflow, stream properties, and water-chemistry constituent concentrations were common in streams in the Central Arizona Basins study area. Temporal trends in the streamflow of unregulated perennial reaches in the Central Highlands tended to be higher from 1900 through the 1930s, lower from the 1940s through the 1970s, and high again after the 1970s. This is similar to the pattern observed for the mean annual precipitation for the Southwestern United States and indicates long-term trends in flow of streams draining the Central Highlands were driven by long-term trends in climate. Streamflow increased over the period of record at stations on effluent-dependent reaches as a result of the increase in the urban population and associated wastewater returns to the Salt and Gila Rivers in the Phoenix metropolitan area and the Santa Cruz River in the Tucson metropolitan area. Concentrations of dissolved solids decreased in the Salt River below Stewart Mountain Dam and in the Verde River below Bartlett Dam. This decrease represents an improvement in the water quality and resulted from a concurrent increase in the amount of runoff entering the reservoirs. Stream loads of water-chemistry constituents were compared at different locations along the streams with one another, and stream loads were compared to upstream inputs of the constituent from natural and anthropogenic sources to determine the relative importance of different sources and to determine the fate of the water-chemistry constituent. Of the dissolved solids transported into the Basin and Range Lowlands each year
Channel morphodynamics in four reaches of the Lower Missouri River, 2006-07
Elliott, Caroline M.; Reuter, Joanna M.; Jacobson, Robert B.
2009-01-01
Channel morphodynamics in response to flow modifications from Gavins Point Dam are examined in four reaches of the Lower Missouri River. Measures include changes in channel morphology and indicators of sediment transport in four 6 kilometer long reaches located downstream from Gavins Point Dam, near Yankton, South Dakota, Kenslers Bend, Nebraska, Little Sioux, Iowa, and Miami, Missouri. Each of the four reaches was divided into 300 transects with a 20-meter spacing and surveyed during the summer in 2006 and 2007. A subset of 30 transects was randomly selected and surveyed 7-10 times in 2006-07 over a wide range of discharges including managed and natural flow events. Hydroacoustic mapping used a survey-grade echosounder and a Real Time Kinematic Global Positioning System to evaluate channel change. Acoustic Doppler current profiler measurements were used to evaluate bed-sediment velocity. Results indicate varying amounts of deposition, erosion, net change, and sediment transport in the four Lower Missouri River reaches. The Yankton reach was the most stable over monthly and annual time-frames. The Kenslers Bend and Little Sioux reaches exhibited substantial amounts of deposition and erosion, although net change was generally low in both reaches. Total, or gross geomorphic change was greatest in the Kenslers Bend reach. The Miami reach exhibited varying rates of deposition and erosion, and low net change. The Yankton, Kenslers Bend, and Miami reaches experienced net erosion during the time period that bracketed the managed May 2006 spring rise event from Gavins Point Dam.
NASA Astrophysics Data System (ADS)
Bhushan, S.; Shean, D. E.; Haritashya, U. K.; Arendt, A. A.; Syed, T. H.; Setiawan, L.
2017-12-01
Glacial lake outburst floods can impact downstream communities due to the sudden outflux of huge quantities of stored water. In this study, we develop a hazard assessment of the moraine dammed glacial lakes in Sikkim Himalayas by analyzing the morphometry of proglacial features, and the surface velocity and mass balance of glaciers. We generated high-resolution digital elevation models (DEMs) using the open-source NASA Ames Stereo Pipeline (ASP) and use other open-source tools to calculate surface velocity and patterns of glacier downwasting over time. Geodetic glacier mass balance is obtained for three periods using high-resolution WorldView/GeoEye stereo DEMs (8 m posting, 2014-2016), Cartosat-1 stereo DEMs (10 m, 2006-2008) and SRTM (30 m, 2000). Initial results reveal a region-wide mass balance of -0.31±0.13 m w.eq.a-1 for the 2007-2015 period, with some debris covered glaciers showing a very low mass loss rate. Additionally, 12 annual glacier velocity fields spanning from 1991 to 2017.derived from Landsat imagery are used to explore the relationship between glacier dynamics and changes in proglacial lakes. Multi-temporal glacial lake mapping is conducted using Landsat and Cartosat imagery. Avalanche and rockfall modeling are combined with morphometric analysis of the proglacial lake area to assess the likelihood of glacial lake dam failure. The above parameters are integrated into a decision tree approach enabling categorization of moraine-dammed lakes according to their potential for outburst events.
Lake Roosevelt Volunteer Net Pens, Lake Roosevelt Rainbow Trout Net Pens, 2002-2003 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Gene
2003-11-01
The completion of Grand Coulee Dam for power production, flood control, and irrigation resulted in the creation of a blocked area above the dam and in the loss of anadromous fish. Because of lake level fluctuations required to meet the demands for water release or storage, native or indigenous fish were often threatened. For many years very little effort was given to stocking the waters above the dam. However, studies by fish biologists showed that there was a good food base capable of supporting rainbow and kokanee (Gangmark and Fulton 1949, Jagielo 1984, Scholz etal 1986, Peone etal 1990). Furthermore » studies indicated that artificial production might be a way of restoring or enhancing the fishery. In the 1980's volunteers experimented with net pens. The method involved putting fingerlings in net pens in the fall and rearing them into early summer before release. The result was an excellent harvest of healthy fish. The use of net pens to hold the fingerlings for approximately nine months appears to reduce predation and the possibility of entrainment during draw down and to relieve the hatcheries to open up available raceways for future production. The volunteer net pen program grew for a few years but raising funds to maintain the pens and purchase food became more and more difficult. In 1995 the volunteer net pen project (LRDA) was awarded a grant through the Northwest Power Planning Council's artificial production provisions.« less
NASA Astrophysics Data System (ADS)
Kim, S.
2016-12-01
This study to improve the accuracy of discharge simulation at the head water of the Tone River Basin (Yagisawa Dam Basin; 167 km2 and Naramata Dam Basin; 67 km2), Japan, where the river discharge is governed by the snowmelt and thus much uncertainty was originated in our previous study (Kim et al, 2011). To decrease the uncertainty in our hydrological modeling and simulation, snowmelt amounts are estimated rigorously using an improved degree-day method. The degree-day method, which is the simplest method to estimate snowmelt, is adopted with an improved degree-day factor estimation method. The degree-day factor for the target area is estimated using the observed temperature and the observed river discharge of the snowmelt season. Using long-term observed data, the unique relationship between the degree-day factor and temperature are extracted, and the estimated degree-day factor as a function of temperature is applied for the winter season discharge simulation. Rainfall-runoff simulation for the rest of season is done by the kinematic wave model based on the stage-discharge relationship, considering surface-subsurface flow generation. Finally, long-term (1979-2008) simulation output for the dam inflow is reconstructed and compared with the observed one. ( Kim, S., Tachikawa, Y., Nakakita, E., Yorozu, K. and Shiiba, M. 2011. Climate change impact on river flow of the Tone river basin, Japan, Annual Journal of Hydraulic Engneering, JSCE, 55:S_85-S_90.)
Parks, T. P.; Quist, Michael C.; Pierce, C.L.
2016-01-01
Nonwadeable rivers are unique ecosystems that support high levels of aquatic biodiversity, yet they have been greatly altered by human activities. Although riverine fish assemblages have been studied in the past, we still have an incomplete understanding of how fish assemblages respond to both natural and anthropogenic influences in large rivers. The purpose of this study was to evaluate associations between fish assemblage structure and reach-scale habitat, dam, and watershed land use characteristics. In the summers of 2011 and 2012, comprehensive fish and environmental data were collected from 33 reaches in the Iowa and Cedar rivers of eastern-central Iowa. Canonical correspondence analysis (CCA) was used to evaluate environmental relationships with species relative abundance, functional trait abundance (e.g. catch rate of tolerant species), and functional trait composition (e.g. percentage of tolerant species). On the basis of partial CCAs, reach-scale habitat, dam characteristics, and watershed land use features explained 25.0–81.1%, 6.2–25.1%, and 5.8–47.2% of fish assemblage variation, respectively. Although reach-scale, dam, and land use factors contributed to overall assemblage structure, the majority of fish assemblage variation was constrained by reach-scale habitat factors. Specifically, mean annual discharge was consistently selected in nine of the 11 CCA models and accounted for the majority of explained fish assemblage variance by reach-scale habitat. This study provides important insight on the influence of anthropogenic disturbances across multiple spatial scales on fish assemblages in large river systems.
McCarthy, Peter M.
2016-04-05
Chapter E of this Scientific Investigations Report documents results from a study by the U.S. Geological Survey, in cooperation with the Montana Department of Environmental Quality and the Montana Department of Natural Resources and Conservation, to provide an update of statewide streamflow characteristics based on data through water year 2009 for streamflow-gaging stations in or near Montana. Streamflow characteristics are presented for 408 streamflow-gaging stations in Montana and adjacent areas having 10 or more years of record. Data include the magnitude and probability of annual low and high streamflow, the magnitude and probability of low streamflow for three seasons (March–June, July–October, and November–February), streamflow duration statistics for monthly and annual periods, and mean streamflows for monthly and annual periods. Streamflow is considered to be regulated at streamflow-gaging stations where dams or other large-scale human modifications affect 20 percent or more of the contributing drainage basin. Separate streamflow characteristics are presented for the unregulated and regulated periods of record for streamflow-gaging stations with sufficient data.
Reconstructed Sediment Mobilization Processes in a Large Reservoir Using Short Sediment Cores
NASA Astrophysics Data System (ADS)
Cockburn, J.; Feist, S.
2014-12-01
Williston Reservoir in northern British Columbia (56°10'31"N, 124°06'33") was formed when the W.A.C. Bennett Dam was created in the late 1960s, is the largest inland body of water in BC and facilitates hydroelectric power generation. Annually the reservoir level rises and lowers with the hydroelectric dam operation, and this combined with the inputs from several river systems (Upper Peace, Finlay, Parsnip, and several smaller creeks) renews suspended sediment sources. Several short-cores retrieved from shallow bays of the Finlay Basin reveal near-annual sedimentary units and distinct patterns related to both hydroclimate variability and the degree to which the reservoir lowered in a particular year. Thin section and sedimentology from short-cores collected in three bays are used to evaluate sediment mobilization processes. The primary sediment sources in each core location is linked to physical inputs from rivers draining into the bays, aeolian contributions, and reworked shoreline deposits as water levels fluctuate. Despite uniform water level lowering across the reservoir, sediment sequences differed at each site, reflecting the local stream inputs. However, distinct organic-rich units, facilitated correlation across the sites. Notable differences in particle size distributions from each core points to important aeolian derived sediment sources. Using these sedimentary records, we can evaluate the processes that contribute to sediment deposition in the basin. This work will contribute to decisions regarding reservoir water levels to reduce adverse impacts on health, economic activities and recreation in the communities along the shores of the reservoir.
Wei, Q.W.; Kynard, B.; Yang, D.G.; Chen, X.H.; Du, H.; Shen, L.; Zhang, H.
2009-01-01
A sampling system for capturing sturgeon eggs using a D-shaped bottom anchored drift net was used to capture early life stages (ELS) of Chinese sturgeon, Acipenser sinensis, and monitor annual spawning success at Yichang on the Yangtze River, 1996-2004, before and just after the Three Gorges Dam began operation. Captured were 96 875 ELS (early life stages: eggs, yolk-sac larvae = eleuthero embryos, and larvae); most were eggs and only 2477 were yolk-sac larvae. Most ELS were captured in the main river channel and inside the bend at the Yichang spawning reach. Yolk-sac larvae were captured for a maximum of 3 days after hatching began, indicating quick dispersal downstream. The back-calculated day of egg fertilization over the eight years indicated a maximum spawning window of 23 days (20 October-10 November). Spawning in all years was restricted temporally, occurred mostly at night and during one or two spawning periods, each lasting several days. The brief temporal spawning window may reduce egg predation by opportunistic predators by flooding the river bottom with millions of eggs. During 1996-2002, the percentage of fertilized eggs in an annual 20-egg sample was between 63.5 to 94.1%; however, in 2003 the percentage fertilized was only 23.8%. This sudden decline may be related to the altered environmental conditions at Yichang caused by operation of the Three Gorges Dam. Further studies are needed to monitor spawning and changes in egg fertilization in this threatened population. ?? 2009 Blackwell Verlag GmbH.
King, S.L.; Allen, J.A.; McCoy, J.W.
1998-01-01
We investigated the long-term effects of a lock and dam and greentree reservoir management on a riparian bottomland hardwood forest in southern Arkansas, USA, by monitoring stress, mortality, and regeneration of bottomland hardwood trees in 53 permanent sampling plots from 1987-1995. The lock and dam and greentree reservoir management have altered the timing, depth, and duration of flooding within the wetland forest. Evaluation of daily river stage data indicates that November overbank flooding (i.e. 0.3 m above normal pool) of 1 week duration occurred only 10 times from 1950 to 1995 and four of these occurrences were the result of artificial flooding of the greentree reservoir. Results of the vegetation study indicate that the five most common dominant and co-dominant species were overcup oak, water hickory, Nuttall oak, willow oak, and sweetgum. Mortality of willow oak exceeded that of all other species except Nuttall oak. Nuttall oak, willow oak, and water hickory had much higher percentages of dead trees concentrated within the dominant and co-dominant crown classes. Probit analysis indicated that differences in stress and mortality were due to a combination of flooding and stand competition. Overcup oak appears to exhibit very little stress regardless of crown class and elevation and, with few exceptions, had a significantly greater probability of occurring within lower stress classes than any other species. Only 22 new stems were recruited into the 5 cm diameter-at-breast height size class between 1990-1995 and of these, three were Nuttall oak, three were water hickory, and one was sweetgum. No recruitment into the 5 cm diameter-at-breast height size class occurred for overcup oak or willow oak. The results of the study suggest that the forest is progressing to a more water-tolerant community dominated by overcup oak. A conservative flooding strategy would minimize tree stress and maintain quality wildlife habitat within the forested wetland.The long-term effects of a lock and dam and greentree reservoir management on a riparian bottomland hardwood forest in southern Arkansas, USA, were investigated by monitoring stress, mortality, and regeneration of bottomland hardwood trees in 53 permanent sampling plots from 1987-1995. Results of the study suggest that the forest is progressing to a more water-tolerant community dominated by overcup oak.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, Lynette A.; Graves, Ritchie J.; Killins, Susan D.
1994-04-01
The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basinmore » juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawkes, Lynnette A.; Martinson, Rick D.; Absolon, Randall F.
1993-05-01
The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relativemore » run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC`s Fish Passage Data System (FPDS).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, Ronald; Kinkead, Bruce; Stanger, Mark
2003-07-01
Historically, Hangman Creek produced Chinook salmon (Oncorhynchus tshawytscha) and Steelhead trout (Oncorhynchus mykiss) for the Upper Columbia Basin Tribes. One weir, located at the mouth of Hangman Creek was reported to catch 1,000 salmon a day for a period of 30 days a year (Scholz et al. 1985). The current town of Tekoa, Washington, near the state border with Idaho, was the location of one of the principle anadromous fisheries for the Coeur d'Alene Tribe (Scholz et al. 1985). The construction, in 1909, of Little Falls Dam, which was not equipped with a fish passage system, blocked anadromous fish accessmore » to the Hangman Watershed. The fisheries were further removed with the construction of Chief Joseph and Grand Coulee Dams. As a result, the Coeur d'Alene Indian Tribe was forced to rely more heavily on native fish stocks such as Redband trout (Oncorhynchus mykiss gairdneri), Westslope Cutthroat trout (O. clarki lewisii), Bull trout (Salvelinus confluentus) and other terrestrial wildlife. Historically, Redband and Cutthroat trout comprised a great deal of the Coeur d'Alene Tribe's diet (Power 1997).« less
Stock-specific migration timing of adult spring-summer Chinook salmon in the Columbia River basin
Keefer, M.L.; Peery, C.A.; Jepson, M.A.; Tolotti, K.R.; Bjornn, T.C.; Stuehrenberg, L.C.
2004-01-01
An understanding of the migration timing patterns of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss is important for managing complex mixed-stock fisheries and preserving genetic and life history diversity. We examined adult return timing for 3,317 radio-tagged fish from 38 stocks of Columbia River basin spring-summer Chinook salmon O. tshawytscha over 5 years. Stock composition varied widely within and between years depending on the strength of influential populations. Most individual stocks migrated at similar times each year relative to overall runs, supporting the hypotheses that run timing is predictable, is at least partially due to genetic adaptation, and can be used to differentiate between some conspecific populations. Arrival timing of both aggregated radio-tagged stocks and annual runs was strongly correlated with river discharge; stocks arrived earlier at Bonneville Dam and at upstream dams in years with low discharge. Migration timing analyses identified many between-stock and between-year differences in anadromous salmonid return behavior and should and managers interested in protection and recovery of evolutionary significant populations.
Variation trend of snowfall in the Kamikochi region of the Japanese Alps
NASA Astrophysics Data System (ADS)
Suzuki, K.
2017-12-01
The Japanese Alps experience exceptionally heavy snowfall, extreme even by global standards, and in spring and summer the melting snow becomes a valuable water resource. The snow effectively acts as a natural dam when it accumulates in watersheds during winter. However, there have been no observations of the amount of snow in high-altitude regions of Japan. Therefore, we cannot discuss the effect of global warming on the change in the amount of snow in these regions based on direct observation data. We were, however, able to obtain climatic and hydrologic data for high-altitude sites in the Japanese Alps, and discuss the variations in these conditions in the Kamikochi region (altitude 1490 m-3190 m) of the Japanese Alps over a 68-year period using these observed data. No long-term trends are observed in the annual mean, maximum, or minimum temperatures at Taisho-ike from 1945 to 2012; the total annual precipitation shows a statistically significant decreasing trend. The annual total snowfall at Taisho-ike from 1969 to 2012 shows a statistically significant increasing trend. The annual total runoff of the Azusa River from 1945 to 2012 shows a statistically significant increasing trend, as does the snowmelt runoff to the river (which occurs from May to July). We can thus conclude that the annual snowfall in the Azusa River catchment has increased in recent years.
Statewide Report Card: An Annual Report to the Legislature on Oregon Public Schools, 2013-2014
ERIC Educational Resources Information Center
Oregon Department of Education, 2014
2014-01-01
The Oregon Statewide Report Card is an annual publication required by law (ORS 329.115), which reports on the state of public schools and their progress towards the goals of the Oregon Educational Act for the 21st Century. The purpose of the Oregon Report Card is to monitor trends among school districts and Oregon's progress toward achieving the…
Statewide Report Card: An Annual Report to the Legislature on Oregon Public Schools, 2011-2012
ERIC Educational Resources Information Center
Oregon Department of Education, 2012
2012-01-01
The Oregon Statewide Report Card is an annual publication required by law (ORS 329.115), which reports on the state of public schools and their progress towards the goals of the Oregon Educational Act for the 21st Century. The purpose of the Oregon Report Card is to monitor trends among school districts and Oregon's progress toward achieving the…
Annual Progress Report - Fiscal Year 1982
1982-10-01
activity . A published method developed in our laboratory for determining tne antibacterial activity of mouse peritoneal phagocytes in vivo (1) has been...EDITOR’S NOTE This FY 1982 Annual Progress report is a general review of research activities of the U. S. Army Medical Research Institute of Infectious...years earlier. Passive immunization, active immunization using killed or living attenuated whole agent, or immunization with sub-unit antigens achieved
Statewide Report Card: An Annual Report to the Legislature on Oregon Public Schools; 2015-2016
ERIC Educational Resources Information Center
Oregon Department of Education, 2016
2016-01-01
The Oregon Statewide Report Card is an annual publication required by law (ORS 329.115), which reports on the state of public schools and their progress towards the goals of the Oregon Educational Act for the 21st Century. The purpose of the Oregon Report Card is to monitor trends among school districts and Oregon's progress toward achieving the…
Pathogenesis of Salmonellosis: Salmonella Exotoxins
1982-03-08
membrane-as3ociated enterotowin produced by S. enteritidis and by S. typhimurium ; however they could find no similarities between their Salmonella ...AD. . 0 REPORT NUJMBER 1 Pathogenesis of Salmoneiliosis: Salmonella Exotoxins Annual Progress Report (12/1/77-9/1/78) Johnny W. Peterson. Ph.D. March...TYPE OF REPORT & PERIOD COVEREOD",- Uathogenesis of ,Salmonellosils: Salmonella Annual Progress Report Exotoxins 12/T/77 9/1/78 C. PERFORMCNG ORG
ERIC Educational Resources Information Center
Oregon Department of Education, 2015
2015-01-01
The Oregon Statewide Report Card is an annual publication required by law (ORS 329.115), which reports on the state of public schools and their progress towards the goals of the Oregon Educational Act for the 21st Century. The purpose of the Oregon Report Card is to monitor trends among school districts and Oregon's progress toward achieving the…
76 FR 65184 - Proposed Information Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-20
... Corporation is soliciting comments concerning its proposed Nonprofit Capacity Building Program Progress Report. The Progress Report consists of two parts: A Progress Report Narrative and a Performance Measurement Reporting Workbook. The Progress Report is completed semi-annually by Nonprofit Capacity Building Grantees...
The measurement of water scarcity: Defining a meaningful indicator.
Damkjaer, Simon; Taylor, Richard
2017-09-01
Metrics of water scarcity and stress have evolved over the last three decades from simple threshold indicators to holistic measures characterising human environments and freshwater sustainability. Metrics commonly estimate renewable freshwater resources using mean annual river runoff, which masks hydrological variability, and quantify subjectively socio-economic conditions characterising adaptive capacity. There is a marked absence of research evaluating whether these metrics of water scarcity are meaningful. We argue that measurement of water scarcity (1) be redefined physically in terms of the freshwater storage required to address imbalances in intra- and inter-annual fluxes of freshwater supply and demand; (2) abandons subjective quantifications of human environments and (3) be used to inform participatory decision-making processes that explore a wide range of options for addressing freshwater storage requirements beyond dams that include use of renewable groundwater, soil water and trading in virtual water. Further, we outline a conceptual framework redefining water scarcity in terms of freshwater storage.
Bolke, E.L.
1979-01-01
The circulation of water in Flaming Gorge Reservoir is caused chiefly by insolation, inflow-outflow relationships, and wind, which is significant due to the geographical location of the reservoir. During 1970-75, there was little annual variation in the thickness, dissolved oxygen, and specific conductance of the hypolimnion near Flaming Gorge Dam. Depletion of dissolved oxygen occurred simultaneously in the bottom waters of both tributary arms in the upstream part of the reservoir and was due to reservoir stratification. Anaerobic conditions in the bottom water during summer stratification eventually results in a metalimnetic oxygen minimum in the reservoir.The depletion of flow in the river below Flaming Gorge Dam due to evaporation and bank storage in the reservoir for the 1963-75 period was 1,320 cubic hectometers, and the increase of dissolved-solids load in the river was 1,947,000 metric tons. The largest annual variations in dissolved-solids concentration in the river was about 600 milligrams per liter before closure of the dam and about 200 milligrams per liter after closure. The discharge weighted-average dissolved-solids concentration for the 5 years prior to closure was 386 milligrams per liter and 512 milligrams per liter after closure. The most significant changes in the individual dissolved-ion loads in the river during 1973-75 were the increase in sulfate (0.46 million metric tons), which was probably derived from the solution of gypsum, and the decrease in bicarbonate (0.39 million metric tons), which can be attributed to chemical precipitation.The maximum range in temperature in the Green River below the reservoir prior to closure of the dam in 1962 was from 0°C in winter to 21°C in summer. After closure until 1970 the temperature ranged from 2° to 12°C, but since 1970 the range has been from 4° to 9°C.The maximum range in temperature in the Green River below the reservoir prior to closure of the dam in 1962 was from 0°C in winter to 21°C in summer. After closure until 1970 the temperature ranged from 2° to 12°C, but since 1970 the range has been from 4° to 9°C.During September 1975, a massive algal bloom was observed in the upstream part of the reservoir. The bloom covered approximately 16 kilometers of the lower part of the Blacks Fork arm, 23 kilometers of the lower part of the Green River arm, and 15 kilometers of the main reservoir below the confluence of the two arms. By October 1975 the algal bloom had disappeared. Nutrient loading in the reservoir was not sufficient to maintain a rate of algal production that would be disastrous to the reservoir ecosystem. However, should the nutrient loading increase substantially, the quality of the reservoir water could probably deteriorate rapidly, and its use for recreation and water supply could be severely limited.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, Franklin R.
1997-11-01
Predator control fisheries aimed at reducing predation on juvenile salmonids by northern squawfish Ptychocheilus oregonensis were implemented for the seventh consecutive year in the mainstem Columbia and Snake rivers. In this report, we (1) evaluate northern squawfish exploitation and size composition, and compare catch rate of incidentally-harvested fishes among the three major management fisheries in 1996, (2) estimate reductions in predation on juvenile salmonids since implementation of the fisheries, and (3) evaluate changes from 1990-96 in relative abundance, consumption, size and age structure, growth, and fecundity of northern squawfish. Systemwide exploitation of northern squawfish 2 250 mm fork length wasmore » 12.1% for sport-reward, 0.3% for dam-angling, and 0.5% for site-specific gill-net fisheries. Total exploitation was lowest in Lower Monumental Reservoir (0.0%) and highest in McNary Reservoir (18.2%). Mean fork length of harvested northern squawfish was 355 mm in the sport-reward, 391 mm in the dam-angling, and 408 mm in the gill-net fisheries. The dam-angling fishery had the lowest percentage (3.6%) of incidental catch relative to the total number of fish caught. Incidental catch was 27.0% in the sport-reward fishery and 54.6% in the gill-net fishery. If exploitation rates remain similar to mean 1991-96 levels, we estimate that potential predation by northern squawfish on juvenile salmonids in 1997 will be approximately 62% of predation levels prior to the implementation of removal fisheries. Further reductions in predation may be small, unless average exploitation in future years is higher than 1994-96 levels. Relative abundance of northern squawfish declined slightly from 1995 in Bonneville Reservoir, Lower Monumental Dam tailrace, and Little Goose Dam tailrace. Mean abundance for 1994-96 was 48-60% of 1990-93 levels among areas sampled at least five years. Indices of consumption were lower than 1995 in all areas except during summer in the tailrace boat-restricted zones of Bonneville and The Dalles dams. Predation indices have declined 69% from pre- 1994 levels. Decreases in proportional stock density were greater than could be explained by fluctuations in year-class strength, strongly suggesting that sustained removals may be altering the size structure of predator-sized northern squawfish. We found no evidence that northern squawfish have compensated in growth or fecundity in response to sustained exploitation.« less
Wind River water restoration, Annual report November 2008 to October 2009.
Connolly, P.J.; Jezorek, I.G.; Munz, C.S.
2010-01-01
This report summarizes work completed by U.S. Geological Survey’s Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period November 2008 through October 2009 under Bonneville Power Administration (BPA) contract 41038. Long term research in the Wind River has focused on assessments of steelhead/rainbow trout Oncorhynchus mykiss populations, interactions with introduced populations of spring Chinook salmon O. tshawytscha and brook trout Salvelinus fontinalis, and influences of habitat variables on fish productivity. During this period, we collected water temperature data to characterize variation within and among tributaries and mainstem sections in the Trout Creek watershed, and assisted Washington Department of Fish and Wildlife with smolt trapping and tagging of smolt and parr steelhead with passive integrated transponder (PIT) tags. We also continued to maintain and test efficacy of a passive integrated transponder tag interrogation system (PTIS) in Trout Creek for assessing the adult steelhead runsize. We continued to maintain and download PTIS setups in the fish ladder at Hemlock Dam. These PTISs contributed information on movement and rearing of steelhead parr and smolts. A statement of work (SOW) was submitted to BPA in October 2009 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.
1981-07-01
INSPECTION REPORT IDENTIFICATION NO.: MA 00030 S NAME OF DAM : TIHONET POND NO.2 DAM TOWN : WAREHAM COUNTY AND STATE : PLYMOUTH , MASSACHUSETTS STREAM...northeast of this dam serves to impound the water of Tihonet Pond also. This dam is referred to as Dam # 14 on Plymouth County Inspection Reports and...1. Approximately 1800 ft. northeast of this dam a second dam is located. This dam is referred to as Dam # 14 on Plymouth County . Inspection Reports
Designing adaptive operating rules for a large multi-purpose reservoir
NASA Astrophysics Data System (ADS)
Geressu, Robel; Rougé, Charles; Harou, Julien
2017-04-01
Reservoirs whose live storage capacity is large compared with annual inflow have "memory", i.e., their storage levels contain information about past inflows and reservoir operations. Such "long-memory" reservoirs can be found in basins in dry regions such as the Nile River Basin in Africa, the Colorado River Basin in the US, or river basins in Western and Central Asia. There the effects of a dry year have the potential to impact reservoir levels and downstream releases for several subsequent years, prompting tensions in transboundary basins. Yet, current reservoir operation rules in those reservoirs do not reflect this by integrating past climate history and release decisions among the factors that influence operating decisions. This work proposes and demonstrates an adaptive reservoir operating rule that explicitly accounts for the recent history of release decisions, and not only current storage level and near-term inflow forecasts. This implies adding long-term (e.g., multiyear) objectives to the existing short-term (e.g., annual) ones. We apply these operating rules to the Grand Ethiopian Renaissance Dam, a large reservoir under construction on the Blue Nile River. Energy generation has to be balanced with the imperative of releasing enough water in low flow years (e.g., the minimum 1, 2 or 3 year cumulative flow) to avoid tensions with downstream countries, Sudan and Egypt. Maximizing the minimum multi-year releases could be of interest for the Nile problem to minimize the impact on performance of the large High Aswan Dam in Egypt. Objectives include maximizing the average and minimum annual energy generation and maximizing the minimum annual, two year and three year cumulative releases. The system model is tested using 30 stochastically generated streamflow series. One can then derive adaptive release rules depending on the value of one- and two-year total releases with respect to thresholds. Then, there are 3 sets of release rules for the reservoir depending on whether one or both thresholds are not met, vs. only one with a non-adaptive rule. Multi-objective evolutionary algorithms (MOEAs) are used to obtain the Pareto front, i.e., non-dominated adaptive and non-adaptive operating rule sets. Implementing adaptive rules is found to improve the trade-offs between energy generation criteria and minimum release targets. Compared with non-adaptive operations, an adaptive operating policy shows an increase of around 3 and 10 Billion cubic meters in the minimum 1 and 3-year cumulative releases for a given value of the same average annual energy generation.
Gadomski, D.M.; Parsley, M.J.; Kofoot, P.
2004-01-01
During 1 April 2002 through 31 March 2003, the U.S. Geological Survey (USGS) continued work on several tasks, including quantifying habitat suitable for white sturgeon Acipenser transmontanus spawning, a long-term survey of young-of-the-year (YOY) white sturgeon recruitment in the lower Columbia River, and a laboratory study investigating predation on larval and juvenile white sturgeon. River discharge and water temperatures that occurred during April through July 2002 provided relatively good conditions for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for approximately three weeks and during a period of relatively high river discharge. Our monthly estimates of the index of spawning habitat showed that the availability of habitat for spawning peaked in June at levels higher than the average of past years. However, indices for the month of May were less than average in all four tailraces. YOY white sturgeon were collected during bottom trawling in Bonneville and The Dalles reservoirs, but none were captured in the John Day Reservoir. In an ongoing comparison of indices of abundance derived from bottom trawls and gill nets, the Oregon Department of Fish and Wildlife also caught YOY white sturgeon in gill nets set in The Dalles Reservoir, but none in the John Day Reservoir. The third year of a three-year laboratory predation study was completed. Adult channel catfish ingested white sturgeon up to a mean total length of about 120 mm, and juvenile walleye ate white sturgeon up to a mean length of 53 mm. When white sturgeon and coho salmon were both available as prey, northern pikeminnow continued to ingest white sturgeon, but in most cases preferred salmon. Conversely, prickly sculpins preferred white sturgeon over goldfish as prey. The presence of cover and also lower light levels reduced predation by sculpins on white sturgeon larvae, but cover did not reduce predation on white sturgeon juveniles. Similar to the past two years, turbidity affected predation of white sturgeon larvae by prickly sculpins, with less sturgeon ingested at higher turbidities.
NASA Astrophysics Data System (ADS)
Mekonnen, Mulatie; Keesstra, Saskia; Baartman, Jantiene; Ritsema, Coen
2014-05-01
Gully erosion is a prime problem in Ethiopia. This study assessed the severity of gully erosion and the role of sediment storage dams (SSD) in restoring gullies and preventing further gully development, its sediment trapping efficacy (STE) and its capacity in converting degraded gully lands to productive land. On average 2.5 m deep, 6.6 m wide and 28.3 m long gullies were formed in Minizr watershed, northwest Ethiopia, in 2013. Concentrated surface runoff, traditional ditches, graded terraces without suitable water ways and road construction are the main causes of such serious gully erosion. Over grazing, tunnel flow and lack of proper immediate gully treatment actions after gully initiation are found to be additional causes of the problem. Gully erosion was also found as the major source of sediment for downstream rivers and water reservoirs. The annual volume of soil eroded from only four gullies was 1941.3 m3. To control gully erosion, SSDs were found to be important physical structures, which can trap significant amount of sediment within gullies and they can convert unproductive gully land to productive agricultural land for fruit and crop production. Eight SSDs trapped about 44*103 m3 of sediment within 2 to 8 years. Two representative SSDs constructed using gabion and stone were tested for their STE. Results showed that their efficacy was 74.1% and 66.4% for the gabion and stone SSDs, respectively. Six of the older SSDs were already full of sediment and created 0.75 ha of productive land within 2 to 8 years. SSDs best fits to treat large size and deep gullies where other gully control measures, check dams, could not function well. To prevent gully formation, controlling its causes that is avoiding traditional ditches, practicing grassed water ways to safely remove runoff water from graded terraces, integrated watershed and road side management practices are important solutions. KEY WORDS: Sediment storage dam, gully erosion, sediment trapping efficacy, productive land, Ethiopia
Colorado River campsite monitoring, Grand Canyon National Park, Arizona, 1998-2012
Kaplinski, Matt; Hazel, Joe; Parnell, Rod; Hadley, Daniel R.; Grams, Paul
2014-01-01
River rafting trips and hikers use sandbars along the Colorado River in Marble and Grand Canyons as campsites. The U.S. Geological Survey evaluated the effects of Glen Canyon Dam operations on campsite areas on sandbars along the Colorado River in Grand Canyon National Park. Campsite area was measured annually from 1998 to 2012 at 37 study sites between Lees Ferry and Diamond Creek, Arizona. The primary purpose of this report is to present the methods and results of the project. Campsite area surveys were conducted using total station survey methods to outline the perimeter of camping area at each study site. Campsite area is defined as any region of smooth substrate (most commonly sand) with no more than an 8 degree slope and little or no vegetation. We used this definition, but relaxed the slope criteria to include steeper areas near boat mooring locations where campers typically establish their kitchens. The results show that campsite area decreased over the course of the study period, but at a rate that varied by elevation zone and by survey period. Time-series plots show that from 1998 to 2012, high stage-elevation (greater than the 25,000 ft3/s stage-elevation) campsite area decreased significantly, although there was no significant trend in low stage-elevation (15,000–20,000 ft3/s) campsite area. High stage-elevation campsite area increased after the 2004 and 2008 high flows, but decreased in the intervals between high flows. Although no overall trend was detected for low stage-elevation campsite areas, they did increase after high-volume dam releases equal to or greater than about 20,000 ft3/s. We conclude that dam operations have not met the management objectives of the Glen Canyon Adaptive Management program to increase the size of camping beaches in critical and non-critical reaches of the Colorado River between Glen Canyon Dam and Lake Mead.
Water quality changes and their relation to fishery resources in the upper Mississippi River
Holland Bartels, L. E.; Becker, C.D.; Neitzel, D.A.
1992-01-01
Despite a long history of human manipulation, the most dramatic changes in the upper Mississippi River occurred in the 1930s with construction of a lock and dam system to facilitate the commercial transport of commodities. In 1988, barge traffic through the system ranged from 7,500 tows per year at Lock and Dam 26 (near Alton, Illinois) to 1, 118 at Lock and Dam 1 (in Minneapolis/St. Paul). The tow-teed dam system created a diversity of lentic habitats, but it also changed the stage and sediment transport characteristics of the river. The principal fishery-related water quality issues of this modified system concern the effects of sediments and toxic contaminants from nonpoint sources. Between 42 and 99% of the streams in the five states of the Mississippi River basin fail to fully support their designated uses because of pollution. primarily from nonpoint sources (e.g., 73% in Minnesota, 98% in Wisconsin, 75% in Illinois). Annual sediment inputs into the upper Mississippi River basin range from minimal in the upper reaches to about 210.000 kg/hectare in the lower reaches. This sediment results in significant losses of fishery habitat. Although bnly 5 to 9% of the total open water area of many pools had been lost by 1975, those losses were in highly productive side channel and backwater areas. Under existing conditions, a loss of an additional 22 to 49% of existing lentic habitats is predicted within 50 years. In addition, toxic contaminants transported along with fine sediments have become more available to stream biota. Although significant interagency efforts have been made to evaluate the impacts on biotic communities of the river. present data are inadequate to determine how changes in water quality affect the fisheries. This lack of data undermines our ability to judge the success of programs initiated to control pollution from point and nonpoint sources.
Tang, Qiang; Bao, Yuhai; He, Xiubin; Fu, Bojie; Collins, Adrian L; Zhang, Xinbao
2016-04-01
Since the launch of the Three Gorges Dam on the Yangtze River, a distinctive reservoir fluctuation zone has been created and significantly modified by regular dam operations. Sediment redistribution within this artificial landscape differs substantially from that in natural fluvial riparian zones, due to a specific hydrological regime comprising steps of water impoundment with increasing magnitudes and seasonal water level fluctuation holding a range of sediment fluxes. This study reinterpreted post-dam sedimentary dynamics in the reservoir fluctuation zone by stratigraphy determination of a 345-cm long sediment core, and related it to impact of the hydrological regime. Seasonality in absolute grain-size composition of suspended sediment was applied as a methodological basis for stratigraphic differentiation. Sedimentary laminations with relatively higher proportions of sandy fractions were ascribed to sedimentation during the dry season when proximal subsurface bank erosion dominates source contributions, while stratigraphy with a lower proportion of sandy fractions is possibly contributed by sedimentation during the wet season when distal upstream surface erosion prevails. Chronology determination revealed non-linear and high annual sedimentation rates ranging from 21.7 to 152.1cm/yr. Although channel geomorphology may primarily determine the spatial extent of sedimentation, seasonal sedimentary dynamics was predominantly governed by the frequency, magnitude, and duration of flooding. Summer inundation by natural floods with enhanced sediment loads produced from upstream basins induced higher sedimentation rates than water impoundment during the dry season when distal sediment supply was limited. We thus conclude that flow regulation manipulates contemporary seasonal sedimentary dynamics in the reservoir fluctuation zone, though little impact on total sediment retention rate was detected. Ongoing reductions in flow and sediment supply under human disturbance may have profound implications in affecting sedimentary equilibrium in the reservoir fluctuation zone. The results herein provide insights of how big dams have disrupted the sediment conveyance processes of large scale fluvial systems. Copyright © 2016 Elsevier B.V. All rights reserved.
Johnson, G.E.; Anglea, S.M.; Adams, N.S.; Wik, T.O.
2005-01-01
A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Oncorhynchus spp. and steelhead O. mykiss by providing a route in the upper water column that downstream migrant fishes can use to pass a hydroelectric dam safely. A prototype structure, called the surface bypass and collector (SBC), was retrofitted on the powerhouse of Lower Granite Dam and was evaluated annually with biotelemetry and hydroacoustic techniques during the 5-year life span of the structure (1996-2000) to determine the entrance configuration that maximized passage efficiency and minimized forebay residence time. The best tested entrance configuration had maximum inflow (99 m 3/s) concentrated in a single surface entrance (5 m wide, 8.5 m deep). We identified five important considerations for future surface flow bypass development in the lower Snake River and elsewhere: (1) an extensive flow net should be formed in the forebay by use of relatively high surface flow bypass discharge (>7% of total project discharge); (2) a gradual increase in water velocity with increasing proximity to the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile fishes; (4) the shape and orientation of the surface entrance(s) should be adapted to fit site-specific features; and (5) construction of a forebay wall to increase fish availability to the surface flow bypass should be considered. The efficiency of the SBC was not high enough (maximum of 62% relative to passage at turbine units 4-5) for the SBC to operate as a stand-alone bypass. Anywhere that surface-oriented anadromous fish must negotiate hydroelectric dams, surface flow bypass systems can provide cost-effective use of typically limited water supplies to increase the nonturbine passage, and presumably survival, of downstream migrants. ??Copyright by the American Fisheries Society 2005.
NASA Astrophysics Data System (ADS)
Jacquet, J.; McCoy, S. W.; McGrath, D.; Nimick, D.; Friesen, B.; Fahey, M. J.; Leidich, J.; Okuinghttons, J.
2016-12-01
The sudden release of water from an ice-dammed lake poses substantial hazard to the downstream environment, but predicting the timing and magnitude of such an event is difficult. We use a series of high-resolution discharge measurements from a glacier-dammed lake, Lago Cachet Dos (LC2), during outburst events to evaluate the environmental conditions that influence the timing of initiation and peak discharge of observed glacial lake outburst floods (GLOFs). Since April 2008, 20 GLOFs have initiated out of LC2, located on the eastern edge of the Northern Patagonia Icefield, Chile and flooded areas along the Rio Colonia- Rio Baker system. GLOF frequency has averaged 2-3 events annually and peak discharges exiting LC2 have ranged widely from 2,000 to >15,000 m3 s-1. Although some LC2 GLOFs are consistent with global compilations relating peak discharge to lake volume, large deviations from the global trend and large intra-event variability are striking and call into question the predictive ability of simple empirical scaling equations. To evaluate the environmental conditions that lead to variability in observed peak discharge, we use a variation of the theoretical model of Nye (1976), which describes the process of englacial conduit evolution as a competition between thermally induced conduit growth and viscous flow of ice causing conduit collapse. We show that, consistent with theory, initial lake volume, lake temperature, and the rate of meltwater input into the glacially dammed lake all influence the peak discharge of measured GLOFs. Consequently, evolving climatic conditions of a region can greatly influence the potential hazard of GLOFs. Our results suggest that more accurate predictions of GLOF timing and magnitude from ice dammed lakes can be made by incorporating additional measurements of environmental conditions.
Long-term changes to flood conditions due to varying management strategies, Rock River, WI
NASA Astrophysics Data System (ADS)
Fredrick, K. C.
2015-12-01
The Rock River is a 300-mile tributary of the Mississippi River in southern Wisconsin. Its source is a protected migratory bird habitat called the Horicon National Wildlife Refuge. Below the refuge, the Rock River flows through mostly rural, agricultural areas, with wide floodplain of mixed land use. Between the dam at Horicon and a hydroelectric dam in Watertown, WI, lie the townships of Lebanon, Ashippun, and Ixonia. These rural townships boast productive agricultural lands of mostly corn, soybeans, and alfalfa. Large portions of their land are within the floodplain, underlain by vast expanses of outwash sands and gravels, glaciolacustrine deposits, and tills. Throughout the region, spring floods are common from snowmelt and spring rain. These annual floods may be exacerbated by frozen ground and slow infiltration, making it an accepted part of life for residents. Over the last 8 years, and possibly as many as 20, this segment of the Rock River has seen an increase in flooding both in periodicity and retention of flood waters. Due to the delicate habitat of the wildlife refuge and the commissioned hydroelectric installation at the upper dam in Watertown, the residents and local governments of the Lebanon/Ashippun/Ixonia segment of the river have mostly been left to their own devices to monitor and manage flood events. Lebanon Township has been recording water levels for several years. Recent events at the hydroelectric plant seem to indicate that it may be playing a more important role in the flooding. High water events and flood retention do not correlate well with precipitation for the region. It appears that releases at the dam, or periods of water retention, are driving the long flooding periods upstream. Negative impacts to the region from the flooding include property damage, loss of arable land, and environmental effects.
McKee, Sarah E; Grissom, Nicola M; Herdt, Christopher T; Reyes, Teresa M
2017-06-01
During gestation, fetal nutrition is entirely dependent on maternal diet. Maternal consumption of excess fat during pregnancy has been linked to an increased risk of neurologic disorders in offspring, including attention deficit/hyperactivity disorder, autism, and schizophrenia. In a mouse model, high-fat diet (HFD)-fed offspring have cognitive and executive function deficits as well as whole-genome DNA and promoter-specific hypomethylation in multiple brain regions. Dietary methyl donor supplementation during pregnancy or adulthood has been used to alter DNA methylation and behavior. Given that extensive brain development occurs during early postnatal life-particularly within the prefrontal cortex (PFC), a brain region critical for executive function-we examined whether early life methyl donor supplementation ( e.g., during adolescence) could ameliorate executive function deficits observed in offspring that were exposed to maternal HFD. By using operant testing, progressive ratio, and the PFC-dependent 5-choice serial reaction timed task (5-CSRTT), we determined that F1 female offspring (B6D2F1/J) from HFD-fed dams have decreased motivation (decreased progressive ratio breakpoint) and require a longer stimulus length to complete the 5-CSRTT task successfully, whereas early life methyl donor supplementation increased motivation and shortened the minimum stimulus length required for a correct response in the 5-CSRTT. Of interest, we found that expression of 2 chemokines, CCL2 and CXCL10, correlated with the median stimulus length in the 5-CSRTT. Furthermore, we found that acute adult supplementation of methyl donors increased motivation in HFD-fed offspring and those who previously received supplementation with methyl donors. These data point to early life as a sensitive time during which dietary methyl donor supplementation can alter PFC-dependent cognitive behaviors.-McKee, S. E., Grissom, N. M., Herdt, C. T., Reyes, T. M. Methyl donor supplementation alters cognitive performance and motivation in female offspring from high-fat diet-fed dams. © FASEB.
McKee, Sarah E.; Grissom, Nicola M.; Herdt, Christopher T.; Reyes, Teresa M.
2017-01-01
During gestation, fetal nutrition is entirely dependent on maternal diet. Maternal consumption of excess fat during pregnancy has been linked to an increased risk of neurologic disorders in offspring, including attention deficit/hyperactivity disorder, autism, and schizophrenia. In a mouse model, high-fat diet (HFD)–fed offspring have cognitive and executive function deficits as well as whole-genome DNA and promoter-specific hypomethylation in multiple brain regions. Dietary methyl donor supplementation during pregnancy or adulthood has been used to alter DNA methylation and behavior. Given that extensive brain development occurs during early postnatal life—particularly within the prefrontal cortex (PFC), a brain region critical for executive function—we examined whether early life methyl donor supplementation (e.g., during adolescence) could ameliorate executive function deficits observed in offspring that were exposed to maternal HFD. By using operant testing, progressive ratio, and the PFC-dependent 5-choice serial reaction timed task (5-CSRTT), we determined that F1 female offspring (B6D2F1/J) from HFD-fed dams have decreased motivation (decreased progressive ratio breakpoint) and require a longer stimulus length to complete the 5-CSRTT task successfully, whereas early life methyl donor supplementation increased motivation and shortened the minimum stimulus length required for a correct response in the 5-CSRTT. Of interest, we found that expression of 2 chemokines, CCL2 and CXCL10, correlated with the median stimulus length in the 5-CSRTT. Furthermore, we found that acute adult supplementation of methyl donors increased motivation in HFD-fed offspring and those who previously received supplementation with methyl donors. These data point to early life as a sensitive time during which dietary methyl donor supplementation can alter PFC-dependent cognitive behaviors.—McKee, S. E., Grissom, N. M., Herdt, C. T., Reyes, T. M. Methyl donor supplementation alters cognitive performance and motivation in female offspring from high-fat diet–fed dams. PMID:28209774
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMichael, Geoffrey A.; Harnish, Ryan A.; Bellgraph, Brian J.
The study reported herein was funded as part of the Anadromous Fish Evaluation Program, which is managed by the U.S. Army Corps of Engineers (USACE). The Anadromous Fish Evaluation Program study code is EST P 02 01: A Study of Salmonid Survival and Behavior through the Columbia River Estuary Using Acoustic Tags. The study was conducted by the Pacific Northwest National Laboratory (PNNL) and National Oceanic and Atmospheric Administration (NOAA) Fisheries for the USACE Portland District. Estimated survival of acoustic-tagged juvenile Chinook salmon and steelhead through the lower Columbia River and estuary in 2009 was lowest in the final 50more » km of the estuary. Probability of survival was relatively high (>0.90) for yearling and subyearling Chinook salmon from the Bonneville Dam forebay (rkm 236) to Three-tree Point (rkm 49.6). Survival of juvenile Chinook salmon declined sharply through the lower 50 km of the estuary. Acoustic-tagged steelhead smolts did not survive as well as juvenile Chinook salmon between Bonneville Dam and the mouth of the Columbia River. Steelhead survival began to decline farther upstream (at rkm 86) relative to that of the Chinook salmon stocks. Subyearling Chinook salmon survival decreased markedly as the season progressed. It remains to be determined whether later migrating subyearling Chinook salmon are suffering increasing mortality as the season progresses or whether some portion of the apparent loss is due to fish extending their freshwater residence. This study provided the first glimpse into what promises to be a very informative way to learn more about how juvenile salmonid passage experiences through the FCRPS may influence their subsequent survival after passing Bonneville Dam. New information regarding the influence of migration pathway through the lower 50 km of the Columbia River estuary on probability of survival of juvenile salmonids, combined with increased understanding regarding the foraging distances and time periods of avian predators should prove useful in developing or assessing management actions to reduce losses of juvenile salmonid smolts that attempt to pass through the estuary on their seaward migration.« less
NASA Astrophysics Data System (ADS)
Vybornova, Olga; Pfeiffer, Eva-Maria; Kutzbach, Lars
2016-04-01
In peatlands, all biogeochemical processes and the amount of exported carbon and nitrogen compounds are strongly influenced by changes in the water table. Peatland drainage leads to increased peat oxidization and changes peatlands from carbon sinks to net carbon sources. Especially, the emissions of the important greenhouse gases (GHG) carbon dioxide, methane and nitrous oxide are increased due to drainage. The currently ongoing restoration in the bog Himmelmoor (N 53° 44'20", E 9° 51'00", Quickborn) with an extent of about 6 km2 one of the largest raised bogs in Schleswig-Holstein, offers the possibility to characterize and to document the development of the fluxes at different sites before, during and after rewetting, using a method of small-scale closed chambers. Six subsites with differing water level and land use were identified: an area that was rewetted 30 years ago with Sphagnum vegetation, an area rewetted in 2009, an area with on-going peat extraction, deep peat cutting ditches refilled with peat with and without Eriophorum angustifolium vegetation and a comparatively dry peat dam. We determined that in the course of years 2014-2015 the measured N2O and CO2 fluxes varied between -0,1 and 1,9 mg m-2 h-1 and between -0,12 and 1,09 g m-2 h-1, respectively, and the highest nitrous oxide as well as carbon dioxide fluxes are typical for the dry peat dam study site. The measured CH4 fluxes were between -1,8 and 22,7 mg m-2 h-1, where the highest rates were found on the area rewetted 30 years ago and on the peat cutting ditches with Eriophorum angustifolium. Accounting for the different global warming potentials (GWP) of the measured greenhouse gases, the annual GHG balance was calculated. Emissions from all study sites ranged between 5,2 and 36 t CO2-eq ha-1 year-1 and were dominated by high emissions of CO2 (2,5 up to 25,5 t CO2-eq ha-1 year-1). Highest emission rates were found at the dry peat dam site and at the area rewetted 30 years ago. The peat dams and piles are also strong N2O sources. The rewetted, vegetated microtopes are strong CH4 sources, whereas all other areas show insignificant CH4 fluxes. The annual GHG emissions in the area rewetted 30 years ago are at least triply as high as the rates of the extraction on-going area, thus demonstrating the long period needed for the establishment of a carbon balance that is similar to the pre-drainage situation.
Woods, Paul F.
1982-01-01
Limnological data collected at Lake Koocanusa were used to investigate the relationship of nutrient loadings, primary productivity, and trophic state of the reservoir during 1972-80. The reservoir, on the Kootenai River, was impounded by Libby Dam on March 21, 1972. Manipulation of the 7.16-cubic-kilometer reservoir for flood control, its primary function, created large fluctuations in reservoir volume and produced annual lake-filling times that ranged from 0.14 to 0.66 year. Loadings of nitrogen and phosphorus prior to and following impoundment of Lake Koocanusa were found to be large enough to predict eutrophic conditions. Beginning in 1976, total phosphorus loadings, but not total nitrogen loadings, were substantially reduced following improvements in waste-water treatment at a fertilizer plant located upstream from the reservoir. The closure of Libby Dam substantially reduced loadings of nitrogen and phosphorus downstream from Lake Koocanusa. On the average, the reservoir retained 63 percent of its influent loading of total phosphorus and 25 percent of its influent loading of total nitrogen. Daily areal and volumetric primary productivity varied widely in each year at four sampled limnological stations. During the 9 years studied, daily areal primary productivity, in milligrams of carbon fixed per square meter, ranged from 0.4 to 420.0; the mean of the 313 sampled days was 128.5. Annual areal primary productivity ranged from 23.2 to 38.5 grams of carbon fixed per square meter and thereby categorized Lake Koocanusa as oligotrophic. The relationship of annual areal primary productivity and 12 selected environmental variables was determined by multiple regression analysis. One of the models that was derived used two variables-annual euphotic zone depth and annual areal phosphorus loading-and accounted for 62.0 percent of the variation in annual areal primary productivity. The distribution of chlorophyll a within the water column indicated that, on the average, more than one-half of the phytoplankton in the reservoir was beneath the euphotic zone. These results support the hypothesis that the reservoir's weak thermal structure had allowed circulation of phytoplankton out of the euphotic zone. The trophic state of Lake Koocanusa was categorized as eutrophic when based on the relationship of the nutrient loadings and the reservoir's ratio of mean depth to hydraulic-residence time. This result conflicted with the oligotrophic ranking the reservoir received based on its areal primary productivity. The discrepancy in trophic state was attributed mainly to the failure of nutrient loading models to adequately account for physical processes within reservoirs. Part of the nutrient loading that entered Lake Koocanusa was unavailable to phytoplankton because the nutrients were carried beneath the euphotic zone by large volumes of interflow and underflow. Another part of the nutrient loading was adsorbed to suspended sediment and removed from the water column. Thus, phytoplankton primary productivity was controlled not only by nutrients, but also by other limno logical processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vannote, R.L.; Sweeney, B.W.
1985-02-28
The report summarizes the results of the first year of a long-term study of the benthic macroinvertebrate fauna of the freshwater portion of the Potomac River extending from Dam No.5 near Williamsport, Maryland downstream to Seneca Pool near Seneca, Maryland. The primary objective of the study was to evaluate long-term trends in the distribution, abundance, and biomass of benthic macroinvertebrates and identify factors controlling the benthic populations, with particular emphasis on factors associated with existing power plant effluents within the study area.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vannote, R.L.; Sweeney, B.W.
1985-02-28
The report summarizes the results of the first year of a long-term study of the benthic macroinvertebrate fauna of the freshwater portion of the Potomac River extending from Dam No. 5 near Williamsport, Maryland downstream to Seneca Pool near Seneca, Maryland. The primary objective of the study was to evaluate long-term trends in the distribution, abundance, and biomass of benthic macroinvertebrates and identify factors controlling the benthic populations, with particular emphasis on factors associated with existing power plant effluents within the study area.
Westerman, Drew A.; Merriman, Katherine R.; De Lanois, Jeanne L.; Berenbrock, Charles
2013-01-01
Precipitation that fell from April 19 through May 3, 2011, resulted in widespread flooding across northern and eastern Arkansas and southern Missouri. The first storm produced a total of approximately 16 inches of precipitation over an 8-day period, and the following storms produced as much as 12 inches of precipitation over a 2-day period. Moderate to major flooding occurred quickly along many streams within Arkansas and Missouri (including the Black, Cache, Illinois, St. Francis, and White Rivers) at levels that had not been seen since the historic 1927 floods. The 2011 flood claimed an estimated 21 lives in Arkansas and Missouri, and damage caused by the flooding resulted in a Federal Disaster Declaration for 59 Arkansas counties that received Federal or State assistance. To further the goal of documenting and understanding floods, the U.S. Geological Survey, in cooperation with the Federal Emergency Management Agency, the U.S. Army Corps of Engineers–Little Rock and Memphis Districts, and Arkansas Natural Resources Commission, conducted a study to summarize meteorological and hydrological conditions before the flood; computed flood-peak magnitudes for 39 streamgages; estimated annual exceedance probabilities for 37 of those streamgages; determined the joint probabilities for 11 streamgages paired to the Mississippi River at Helena, Arkansas, which refers to the probability that locations on two paired streams simultaneously experience floods of a magnitude greater than or equal to a given annual exceedance probability; collected high-water marks; constructed flood-peak inundation maps showing maximum flood extent and water depths; and summarized flood damages and effects. For the period of record used in this report, peak-of-record stage occurred at 24 of the 39 streamgages, and peak-of-record streamflow occurred at 13 of the 30 streamgages where streamflow was determined. Annual exceedance probabilities were estimated to be less than 0.5 percent at three streamgages. The joint probability values for streamgages paired with the Mississippi River at Helena, Ark., streamgage indicate a low probability of concurrent flooding with the paired streamgages. The inundation maps show the flood-peak extent and water depth of flooding for two stream reaches on the White River and two on the Black River; the vicinities of the communities of Holly Grove and Cotton Plant, Ark.; a reach of the White River that includes the crossing of Interstate 40 north of De Valls Bluff, Ark.; and the Tailwaters of Beaver Dam near Eureka Springs, Ark., Table Rock Dam near Branson, Mo., and Bull Shoals Dam near Flippin, Ark. The data and inundation maps can be used for flood response, recovery, and planning efforts by Federal, State, and local agencies.
Economic implications of climate-driven trends in global hydropower generation
NASA Astrophysics Data System (ADS)
Turner, S. W. D.; Galelli, S.; Hejazi, M. I.; Clarke, L.; Edmonds, J.; Kim, S. H.
2017-12-01
Recent progress in global scale hydrological and dam modeling has allowed for the study of climate change impacts on global hydropower production. Here we explore how these impacts could affect the composition of global electricity supply, and what those changes could mean for power sector emissions and investment needs in the 21st century. Regional hydropower projections are developed for two emissions scenarios by forcing a coupled global hydrological and dam model (1593 major hydropower dams; 54% global installed capacity) with downscaled, bias-corrected climate realizations derived from sixteen General Circulation Models (GCMs). To incorporate possible non-linearity in hydropower response to climate change, dam simulations incorporate plant specifications (e.g., maximum turbine flow), reservoir storage dynamics, reservoir bathymetry, evaporation losses and bespoke, site specific operations. Consequent impacts on regional and global-level electricity generation and associated emissions and investment costs are examined using the Global Change Assessment Model (GCAM). We show that changes in hydropower generation resulting from climate change can shift power demands onto and away from carbon intensive technologies, resulting in significant impacts on CO2 emissions for several regions. Many of these countries are also highly vulnerable to investment impacts (costs of new electricity generating facilities to make up for shortfalls in hydro), which in some cases amount to tens of billions of dollars by 2100. The Balkans region—typified by weak economies in a drying region that relies heavily on hydropower—emerges as the most vulnerable. Reduced impacts of climate change on hydropower production under a low emissions scenario coincide with increased costs of marginal power generating capacity (low emissions requires greater uptake of clean generating technologies, which are more expensive). This means impacts on power sector investment costs are similar for high and low emissions scenarios.
Marin, Evelyn Cristina Santana; Balbi, Ana Paula Coelho; Francescato, Heloísa Della Coletta; Alves da Silva, Cleonice Giovanini; Costa, Roberto Silva; Coimbra, Terezila M
2008-01-01
Adult rats submitted to perinatal salt overload presented renin-angiotensin system (RAS) functional disturbances. The RAS contributes to the renal development and renal damage in a 5/6 nephrectomy model. The aim of the present study was to analyze the renal structure and function of offspring from dams that received a high-salt intake during pregnancy and lactation. We also evaluated the influence of the prenatal high-salt intake on the evolution of 5/6 nephrectomy in adult rats. A total of 111 sixty-day-old rat pups from dams that received saline or water during pregnancy and lactation were submitted to 5/6 nephrectomy (nephrectomized) or to a sham operation (sham). The animals were killed 120 days after surgery, and the kidneys were removed for immunohistochemical and histological analysis. Systolic blood pressure (SBP), albuminuria, and glomerular filtration rate (GFR) were evaluated. Increased SBP, albuminuria, and decreased GFR were observed in the rats from dams submitted to high-sodium intake before surgery. However, there was no difference in these parameters between the groups after the 5/6 nephrectomy. The scores for tubulointerstitial lesions and glomerulosclerosis were higher in the rats from the sham saline group compared to the same age control rats, but there was no difference in the histological findings between the groups of nephrectomized rats. In conclusion, our data showed that the high-salt intake during pregnancy and lactation in rats leads to structural changes in the kidney of adult offspring. However, the progression of the renal lesions after 5/6 nephrectomy was similar in both groups.
NASA Technical Reports Server (NTRS)
Baer, Lisa A.; Wade, Charles E.; Plaut, Karen; Ronca, April E.; Dalton, Bonnie (Technical Monitor)
2002-01-01
From pregnancy to weaning there is a progressive elevation of plasma oxytocin (OT) levels associated with nursing activity, irrespective of litter size. In the present study, we analyzed the effects of continuous 1.5G, 1.75G and 2.0G hypergravity exposure on OT plasma concentration in prepartum (Gestation Day 20) (G20) and lactating (Postnatal day) (P10) rat dams. For this study, litter size was controlled with a yoking procedure established in our lab where individual control litters were yoked-matched to individual hypergravity litters. We reviewed all data at hypergravity irrespective of gravitational level and compared the values with the controls in both G20 (HG, n=15;SC, n=9) and P10 (HG, n=21;SC, n=16). Results showed that over time, we did observe the expected OT increase in both groups. In G20 dams, measurement of OT concentrations showed no significance. However, at P10, measurements of OT concentrations suggest a reduction of about 20% compared to established controls in our laboratory, 0.9+/-0.09 ng/ml for the controls and 0.7+/-0.06 ng/ml for centrifuged animals (p<0.02). These data suggest that exposure to centrifugation may reduce OT levels during lactation. When these plasma samples were obtained, the dams were removed from the litters, and values were not adjusted for the size of the litters. The reduction in OT with centrifugation may reflect a decrease in nursing activity or a decreased responsiveness of the mammary hypothalamic axis. In addition, we have analyzed data on plasma prolactin concentrations and mammary gland development, which may give additional insight to the results of our OT measurements.
Baseline predictors of aortic stiffness progression among multi-ethnic Asians with type 2 diabetes.
Moh, Mei Chung; Sum, Chee Fang; Tavintharan, Subramaniam; Ang, Keven; Lee, Simon Biing Ming; Tang, Wern Ee; Lim, Su Chi
2017-05-01
This 3-year prospective study aimed to identify baseline parameters that predicted the progression of carotid-femoral pulse wave velocity (cf-PWV), which was used to evaluate aortic stiffness, among Singapore's multi-ethnic Asians with type 2 diabetes (T2DM). The cf-PWV was measured by the gold-standard tonometry method in 994 T2DM subjects at baseline and follow-up. The annual rate of cf-PWV change was calculated, and individuals above the 90 th percentile with rate≥1.42 m/s per year were regarded as rapid progressors (n = 104). In a subgroup analysis of subjects with normal cf-PWV at 1 st visit (n = 611), incident aortic stiffness was defined as follow-up cf-PWV≥10 m/s (n = 188). The total cohort (mean age:57 ± 10 years; 53.4% Chinese, 20.4% Malay, 22.9% Indian, 3.2% 'Others') displayed a median annual cf-PWV progression rate of 0.2 m/s. Adjusted multivariate regression analyses showed that baseline age, cf-PWV and body mass index (BMI) constantly predicted follow-up cf-PWV, annual cf-PWV progression rate, rapid cf-PWV progression, and incident aortic stiffness. Paradoxically, lower baseline cf-PWV was associated with elevated annual cf-PWV progression rate and rapid progressors. This inverse relationship remained significant across ethnicities after ethnic stratification. Higher BMI independently predicted cf-PWV progression in Chinese and Indians, but not in Malay and 'Others' ethnic groups. Increased age was a significant predictor in Chinese and 'Others' ethnicities. We demonstrated that baseline BMI is a modifiable independent risk factor of cf-PWV progression and incident aortic stiffness. Therefore, better obesity management may impede aortic stiffness in Singapore's T2DM patients, especially in the Chinese and Indians. Copyright © 2017. Published by Elsevier B.V.
NASA Astrophysics Data System (ADS)
Serra-Llobet, A.; Tàbara, J.; Sauri, D.
2012-12-01
The failure of Tous dam on the Júcar River near Valencia in 1982 was one of the most important socio-natural disasters in 20th century Spain. The death toll of 25 would have been much greater had not a local dam manager anticipated the failure and alerted mayors of a failure, before it actually occurred. The Tous Dam failure occurred a week before the first democratic elections in Spain after the Franco dictatorship, it received extensive coverage in the media. As a result, this disaster triggered a paradigm change in the way disaster risks were perceived and managed at multiple levels of government in Spain. Many factors, often of a qualitative and organisational nature, affect (vertical and horizontal) communication in disaster risk reduction learning and planning at the community level. Through interviews with key actors and stakeholders, content analysis of scientific literature, review of historical and media accounts, and analysis of legislation and regulation, we documented changes that resulted from the Tous Dam failure: (1) A process of institutional development, which led to the growth, and increase in complexity of the organisations involved both in vertical and horizontal communication of disaster risk reduction. (2) Actions taken and experiences gained in dealing with disaster risk reduction in the Tous area were used as a benchmark to develop new strategies, as well as new mechanisms for communication and planning in other territories and other risk domains in Spain.We identify three main stages from 1980s to present in the evolution of disaster risk reduction planning in the area, which show a progressive shift towards a more integrated and preventative approach: (1) After the collapse of the Tous Dam, disaster risk reduction strategies in Spain focused on improving preparedness in order to reduce short-term risks. (2) Disaster management in the 1990s was strongly influenced by international initiatives (e.g. the UN International Decade for Natural Disaster Reduction), which emphasized the contextualization of risk and the importance in long-term disaster risk reduction measures such as land use planning. (3) The European Water Framework Directive (2000) and, more recently, the Flood Directive (2007) are exerting a strong influence on the development of a new Spanish flood policy that focuses on preventive measures and integrates, for the first time, ecological concerns and climate change adaptation in flood management strategies.
Annual Coded Wire Tag Program; Oregon Missing Production Groups, 1996 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mark A.; Mallette, Christine; Murray, William M.
1998-03-01
This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Annual Coded Wire Tag Program - Oregon Missing Production Groups Project. Tule stock fall chinook were caught primarily in British Columbia and Washington ocean, and Oregon freshwater fisheries. Up-river bright stock fall chinook contributed primarily to Alaska and British Columbia ocean commercial, and Columbia River gillnet and other freshwater fisheries. Contribution of Rogue stock fall chinook released in the lower Columbia River occurred primarily in Oregon ocean commercial and Columbia river gillnet fisheries. Willamettemore » stock spring chinook contributed primarily to Alaska and British Columbia ocean commercial, Oregon freshwater sport and Columbia River gillnet fisheries. Willamette stock spring chinook released by CEDC contributed to similar fisheries as the same stocks released in the Willamette system. Up-river stocks of spring chinook contributed almost exclusively to Columbia River sport fisheries and other freshwater recovery areas. The up-river stocks of Columbia River summer steelhead contributed primarily to the Columbia River gillnet and other freshwater fisheries. Coho ocean fisheries from Washington to California were closed or very limited in 1994 and 1995 (1991 and 1992 broods). This has resulted in a greater average percent of catch for other fishery areas. Coho stocks released by ODFW below Bonneville Dam contributed mainly to Oregon and Washington ocean, Columbia Gillnet and other freshwater fisheries. Coho stocks released in the Klaskanine River and Youngs Bay area had much higher contribution to gillnet fisheries than the other coho releases. Coho stocks released above Bonneville Dam contributed to the same fisheries as those released below Bonneville Dam. Survival rates of salmon and steelhead are influenced, not only by factors in the hatchery (disease, density, diet, size and time of release) but also by environmental factors in the river and ocean. These environmental factors are controlled by large scale weather patterns such as El Nino over which man has no influence. Changes in rearing conditions in the hatchery, over which man has some influence, do impact the survival rates. However, these impacts can be offset by impacts caused by environmental factors. Brood years of salmon and steelhead that were in the ocean during the 1983 El Nino event exhibited poor survival all along the Pacific coast of California, Oregon, and Washington. However, stocks of chinook and coho that entered the ocean in the fall of 1984 following the El Nino experienced remarkably improved survival rates. In some instances, tule fall chinook experienced survival rates almost ten times higher than for the previous brood years of the same stock. Coho salmon released in the Columbia River generally experience better survival rates when released later in the spring. However, for the 1990 brood year June releases of Columbia River coho had much lower survival than May releases, for all ODFW hatcheries. In general survival of ODFW Columbia River hatchery coho has declined to low levels since the 1989 brood year.« less
Longitudinal analysis of progression in glaucoma using spectral-domain optical coherence tomography.
Wessel, Julia M; Horn, Folkert K; Tornow, Ralf P; Schmid, Matthias; Mardin, Christian Y; Kruse, Friedrich E; Juenemann, Anselm G; Laemmer, Robert
2013-05-01
To compare the longitudinal loss of RNFL thickness measurements by SD-OCT in healthy individuals and glaucoma patients with or without progression concerning optic disc morphology. A total of 62 eyes, comprising 38 glaucomatous eyes with open angle glaucoma and 24 healthy controls, were included in the study (Erlangen Glaucoma Registry, NTC00494923). All patients were investigated annually over a period of 3 years by Spectralis SD-OCT measuring peripapillary RNFL thickness. By masked comparative analysis of photographs, the eyes were classified into nonprogressive and progressive glaucoma cases. Longitudinal loss of RNFL thickness was compared with morphological changes of optic disc morphology. Mixed model analysis of annual OCT scans revealed an estimated annual decrease of the RNFL thickness by 2.12 μm in glaucoma eyes with progression, whereas glaucoma eyes without progression in optic disc morphology lost 1.18 μm per year in RNFL thickness (P = 0.002). The rate of change in healthy eyes was 0.60 μm and thereby also significantly lower than in glaucoma eyes with progression (P < 0.001). The intrasession variability of three successive measurements without head repositioning was 1.5 ± 0.7 μm. The loss of mean RNFL thickness exceeded the intrasession variability in 60% of nonprogressive eyes, and in 85% of progressive eyes after 3 years. LONGITUDINAL MEASUREMENTS OF RNFL THICKNESS USING SD-OCT SHOW A MORE PRONOUNCED REDUCTION OF RNFL THICKNESS IN PATIENTS WITH PROGRESSION COMPARED WITH PATIENTS WITHOUT PROGRESSION IN GLAUCOMATOUS OPTIC DISC CHANGES. (www.clinicaltrials.gov number, NTC00494923.).
Twichell, D.C.; Cross, V.A.; Hanson, A.D.; Buck, B.J.; Zybala, J.G.; Rudin, M.J.
2005-01-01
Turbidites, which have accumulated in Lake Mead since completion of the Hoover Dam in 1935, have been mapped using high-resolution seismic and coring techniques. This lake is an exceptional natural laboratory for studying fine-grained turbidite systems in complex topographic settings. The lake comprises four relatively broad basins separated by narrow canyons, and turbidity currents run the full length of the lake. The mean grain size of turbidites is mostly coarse silt, and the sand content decreases from 11-30% in beds in the easternmost basin nearest the source to 3-14% in the central basins to 1-2% in the most distal basin. Regionally, the seismic amplitude mimics the core results and decreases away from the source. The facies and morphology of the sediment surface varies between basins and suggests a regional progression from higher-energy and possibly channelized flows in the easternmost basin to unchannelized flows in the central two basins to unchannelized flows that are ponded by the Hoover Dam in the westernmost basin. At the local scale, turbidites are nearly flat-lying in the central two basins, but here the morphology of the basin walls strongly affects the distribution of facies. One of the two basins is relatively narrow, and in sinuous sections reflection amplitude increases toward the outsides of meanders. Where a narrow canyon debouches into a broad basin, reflection amplitude decreases radially away from the canyon mouth and forms a fan-like deposit. The fine-grained nature of the turbidites in the most distal basin and the fact that reflections drape the underlying pre-impoundment surface suggest ponding here. The progression from ponding in the most distal basin to possibly channelized flows in the most proximal basin shows in plan view a progression similar to the stratigraphic progression documented in several minibasins in the Gulf of Mexico. Copyright ?? 2005, SEPM (Society for Sedimentary Geology).
The Role of AKT in Androgen-Independent Progression of Human Prostate Cancer
2005-02-01
1244. 45 Bellacosa A et al. Akt activation by growth factors is a multiple- 64 Bilbao G et al. Reduction of ischemia - reperfusion injury of the step...biological activities of rapamycin at the doses used. 5 1 241 ases, 11 Bcl - 2 family members, 30 death domain-, seven Interestingly, Roth and colleagues...brain, liver, heart) tissues from dam- high enough for stochastic interactions with membrane- age that follows ischemia and reperfusion . Many of these
2016 Nebraska Higher Education Progress Report
ERIC Educational Resources Information Center
Nebraska's Coordinating Commission for Postsecondary Education, 2016
2016-01-01
The 2016 Nebraska Higher Education Progress Report is the 12th annual progress report designed to provide the Nebraska Legislature with comparative statistics to monitor and evaluate progress toward achieving three key priorities for Nebraska's postsecondary education system. These priorities were developed by the 2003 LR 174 Higher Education Task…
WinDAM C earthen embankment internal erosion analysis software
USDA-ARS?s Scientific Manuscript database
Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...
Leite, Andréa G B; Duarte, Maria Irma S; Mendes-Correa, Maria Cássia
2015-01-01
Several studies have demonstrated that HIV/hepatitis C virus (HCV)-coinfected patients experience more rapid fibrosis progression. In this study, to estimate the annual rate of direct liver fibrosis progression, we used analyses of paired biopsy samples from HIV/HCV-coinfected patients without prior treatment of hepatitis and assessed the possible association of fibrosis progression with certain clinical variables. We evaluated 30 HIV/HCV-coinfected patients, with no history of prior treatment of hepatitis C, who underwent paired liver biopsies. All patients were under antiretroviral therapy at first and second biopsies. The average annual progression rate was 0.13 fibrosis unit/year, with 36.7% of patients defined as progressors. Liver fibrosis progression was associated with alanine aminotransferase (ALT; P < .001) and aspartate aminotransferase (AST; P < .0340) levels over 3 times the upper limit of normal present at first biopsy. Elevated ALT and AST levels appear to be associated with more accelerated liver fibrosis progression among HIV/HCV-coinfected patients. © The Author(s) 2015.
Deer Creek Dam, Dam, 1,204 feet/238 degrees from intersection of ...
Deer Creek Dam, Dam, 1,204 feet/238 degrees from intersection of dam complex access road and U.S. Highway 189 to center of dam, 874 feet/352 degrees from Hydroelectric Powerplant (HAER UT-93-B) to center of dam, Charleston, Wasatch County, UT
ERIC Educational Resources Information Center
Texas Advisory Council for Technical - Vocational Education, Austin.
Assessment of the present status of vocational education in Texas and recommended priorities for the future constitute this annual report. Part 1 documents the progress of the 1970s and lists 15 challenges for vocational education in the 1980s, including application of meaningful evaluation procedures and careful program planning to maximize cost…
Annual Research Progress Report, Fiscal Year 1980
1980-10-01
AITE -sd Subtitle) 3. TYPE OF REPORT & PERIOD COVERED 4UAL RESEARCH pROGRESS REPORT ____________ANNUAL - FY 80 S- -- 4. PERFORMING ORG. REPORT NUNSER 7...AUHON) 4F e. CONTRACT OR GRANT NUMBER(e)’ JAMES DERSON, JR , M.D. 10. PERFORMING ORGANIZATION NAME AND ADDRESS 10- PROGRAM ELEMENT, PROJECT, TASK...and DOD) regulations governing human, animal and even in vitro research, the declining number of academic physicians serving as role models and
Zhou, Wen-Jun; Zhang, Yong-Ye; Li, Hua; Wu, Yu-Fei; Xu, Ji; Lv, Sha; Li, Ge; Liu, Shi-Chun; Song, Sheng-Fang
2016-01-01
Background To determine the change in refractive error and the incidence of myopia among school-aged children in the Yongchuan District of Chongqing City, Western China. Methods A population-based cross-sectional survey was initially conducted in 2006 among 3070 children aged 6 to 15 years. A longitudinal follow-up study was then conducted 5 years later between November 2011 and March 2012. Refractive error was measured under cycloplegia with autorefraction. Age, sex, and baseline refractive error were evaluated as risk factors for progression of refractive error and incidence of myopia. Results Longitudinal data were available for 1858 children (60.5%). The cumulative mean change in refractive error was −2.21 (standard deviation [SD], 1.87) diopters (D) for the entire study population, with an annual progression of refraction in a myopic direction of −0.43 D. Myopic progression of refractive error was associated with younger age, female sex, and higher myopic or hyperopic refractive error at baseline. The cumulative incidence of myopia, defined as a spherical equivalent refractive error of −0.50 D or more, among initial emmetropes and hyperopes was 54.9% (95% confidence interval [CI], 45.2%–63.5%), with an annual incidence of 10.6% (95% CI, 8.7%–13.1%). Myopia was found more likely to happen in female and older children. Conclusions In Western China, both myopic progression and incidence of myopia were higher than those of children from most other locations in China and from the European Caucasian population. Compared with a previous study in China, there was a relative increase in annual myopia progression and annual myopia incidence, a finding which is consistent with the increasing trend on prevalence of myopia in China. PMID:26875599
Zhou, Wen-Jun; Zhang, Yong-Ye; Li, Hua; Wu, Yu-Fei; Xu, Ji; Lv, Sha; Li, Ge; Liu, Shi-Chun; Song, Sheng-Fang
2016-07-05
To determine the change in refractive error and the incidence of myopia among school-aged children in the Yongchuan District of Chongqing City, Western China. A population-based cross-sectional survey was initially conducted in 2006 among 3070 children aged 6 to 15 years. A longitudinal follow-up study was then conducted 5 years later between November 2011 and March 2012. Refractive error was measured under cycloplegia with autorefraction. Age, sex, and baseline refractive error were evaluated as risk factors for progression of refractive error and incidence of myopia. Longitudinal data were available for 1858 children (60.5%). The cumulative mean change in refractive error was -2.21 (standard deviation [SD], 1.87) diopters (D) for the entire study population, with an annual progression of refraction in a myopic direction of -0.43 D. Myopic progression of refractive error was associated with younger age, female sex, and higher myopic or hyperopic refractive error at baseline. The cumulative incidence of myopia, defined as a spherical equivalent refractive error of -0.50 D or more, among initial emmetropes and hyperopes was 54.9% (95% confidence interval [CI], 45.2%-63.5%), with an annual incidence of 10.6% (95% CI, 8.7%-13.1%). Myopia was found more likely to happen in female and older children. In Western China, both myopic progression and incidence of myopia were higher than those of children from most other locations in China and from the European Caucasian population. Compared with a previous study in China, there was a relative increase in annual myopia progression and annual myopia incidence, a finding which is consistent with the increasing trend on prevalence of myopia in China.
NASA Astrophysics Data System (ADS)
Dume, Bayu; Amsalu, Nebiyu; Bode, Samuel; Mtei, Kelvin; Munishi, Linus; Navas, Ana; Semmens, Brice; Smith, Hugh; Stock, Brian; Blake, Will; Boeckx, Pascal
2017-04-01
Soil erosion and associated downstream siltation of dams and lakes is becoming serious threat to catchment ecosystem services supporting water, food and energy security in Ethiopia. Sediments originate on catchment hillslopes but mobilisation processes vary depending on land use and terrain. The Gilgel Gibe hydroelectric dam is one of a series of development projects launched by the Federal Government of Ethiopia. The catchment is characterised by erodible, deforested agricultural land which is also overgrazed. Siltation and nutrient enrichment are significant issues given 'hotspot' sheet erosion estimates of 2210 ton per square km. The annual contribution of sediment from the Gilgel Gibe River to the dam was estimated at 277 thousand tons per year leading to accumulations of 3.75 x 107 cubic metres per year of silt behind the dam. The primary driver for mobilisation and translocation to downstream is believed to be erosion on agricultural lands and collapse of steep banks, through landsliding into river channels in the highland headwaters. The relative importance of specific sources of siltation are unknown and sediment source apportionment has been identified as a first essential step before soil conservation measures can be implemented. Knowledge of sediment source and transfer dynamics is critical to inform management policy decisions to maintain and enhance future food, water and energy security To test the applicability of a new combination of Bayesian unmixing modelling with sediment fingerprinting in this terrain (IMIXSED approach) a demonstration sub-catchment was selected through field assessment in the upper Gilgel-Gibe water-supply catchments (Unta River) and sampling strategies designed. Accordingly, sources, i.e. soil samples from landslides (n=40), eroding channel bank (n = 5), cultivated land (n = 30), grasslands (n = 30), wooded areas (n = 10), homestead plots (n = 10) were collected alongside 10 spatially-integrated sediment deposits from the receptor cobble bed river after the 2016 rainy season. In order to extract reliable information on the sources of fine sediment delivered into rivers and dam, new isotopic techniques (e.g., Compound Specific Stable Isotopes (CSSIs)) combined with other isotopic techniques (fallout radionuclides) and geochemical tracer properties (via WD-XRF) were employed to quantify sediment sources. Results from this demonstration catchment are discussed in the context of the wider sediment pressures on the Hydro-Electric Power infrastructure of the Gilgel Gibe system.
Risk Analysis of Earth-Rock Dam Failures Based on Fuzzy Event Tree Method
Fu, Xiao; Gu, Chong-Shi; Su, Huai-Zhi; Qin, Xiang-Nan
2018-01-01
Earth-rock dams make up a large proportion of the dams in China, and their failures can induce great risks. In this paper, the risks associated with earth-rock dam failure are analyzed from two aspects: the probability of a dam failure and the resulting life loss. An event tree analysis method based on fuzzy set theory is proposed to calculate the dam failure probability. The life loss associated with dam failure is summarized and refined to be suitable for Chinese dams from previous studies. The proposed method and model are applied to one reservoir dam in Jiangxi province. Both engineering and non-engineering measures are proposed to reduce the risk. The risk analysis of the dam failure has essential significance for reducing dam failure probability and improving dam risk management level. PMID:29710824
2018-05-15
This report summarizes the annual progress of EPA’s Clean Air Markets Programs such as the Acid Rain Program (ARP) and the Cross-State Air Pollution Rule (CSAPR). EPA systematically collects data on emissions, compliance, and environmental effects, these data are highlighted in our Progress Reports.
2018-05-16
This report summarizes the annual progress of EPA’s Clean Air Markets Programs such as the Acid Rain Program (ARP) and the Cross-State Air Pollution Rule (CSAPR). EPA systematically collects data on emissions, compliance, and environmental effects, these data are highlighted in our Progress Reports.
6. GENE WASH DAM, LOOKING NORTHWEST. SURVEY REFLECTOR IN FOREGROUND ...
6. GENE WASH DAM, LOOKING NORTHWEST. SURVEY REFLECTOR IN FOREGROUND FOR MONITORING MOVEMENT OF DAM AND EARTH. - Gene Wash Reservoir & Dam, 2 miles west of Parker Dam, Parker Dam, San Bernardino County, CA
NASA Astrophysics Data System (ADS)
Nzumotcha Tchoumkam, Linda Armelle
The infiltration through the core of foundation of embankment dams is a problem which is worrying for safety and economical dams. The mechanism of infiltration can be progressive and can disturb the stability or the durability of the structures. Consequently, its evolution can undermine public security. Statistics made for 11192 embankment dams through the world showed that until 1986, 48% of damages have been caused by internal erosion. This internal erosion was generated by infiltration through the core or the foundation of embankment dam. Electrical, electromagnetic and thermometric methods are usually considered as investigation methods. The goal of this work is to study the sensibility of the self-potential method (S.P.) to detect seepage for the case of embankment dams. We used S.P jointly with electrical resistance tomography (ERT). To attain this objective, we acquired self-potential and resistivity data with periodic changes of the water level in the reservoir. These changes were made every spring (in November) and every summer (in April) at the emptying and impounding of the reservoir. For this project, measures have been conducted over a period of two years (2008-2010). Before that, thermometry, self-potential and magnetic methods were applied on the site to acquire information about seepage and its approximate position. Flow rate was also measured. In April 2010, injection of grout was used to clog seepage. The measurements allowed to represent the variation of potential with time and space. That permitted to make a distinction between different sources of self-potential signal. The mapping of the electric potential during the emptying and the impounding of the reservoir showed a negative anomaly which correlate to an outflow located in the upstream of the dam. The monitoring of the S.P. signal permitted to dissociate an anomaly zone which can be related to the site of injection of grout. The gradient of self-potential decreased with the increase of pressure gradient. We have computed the effective electro kinetic (EK) coupling coefficient of the dam from the variation of the potential with water level. Time-lapse ERT is used to control the variation of electrical conductivity of the material together with changes in water level. The anomaly in the time-lapse represented agrees with the outflow. We also propose a 3D numerical model to interpret the measurements in a semi-quantitative manner. Comparing between results of modeling and the survey data, differences are noted that can be explained in different ways. More work would be needed to elucidate those differences, in particular with the measurement strategy and the estimation of coupling coefficients. Nevertheless, the proposed approach allowed to underline different variations under the ground. These results have also been used to discuss the limitations of the self-potential method applied to detect seepage in the dam.
Xu, Fu-gang; Yang, Xing-guo; Zhou, Jia-wen; Hao, Ming-hui
2013-01-01
Dam breaks of landslide dams are always accompanied by large numbers of casualties, a large loss of property, and negative influences on the downstream ecology and environment. This study uses the Jiadanwan landslide dam, created by the Wenchuan earthquake, as a case study example. Several laboratory experiments are carried out to analyse the dam-break mechanism of the landslide dam. The different factors that impact the dam-break process include upstream flow, the boulder effect, dam size, and channel discharge. The development of the discharge channel and the failure of the landslide dam are monitored by digital video and still cameras. Experimental results show that the upstream inflow and the dam size are the main factors that impact the dam-break process. An excavated discharge channel, especially a trapezoidal discharge channel, has a positive effect on reducing peak flow. The depth of the discharge channel also has a significant impact on the dam-break process. The experimental results are significant for landslide dam management and flood disaster prevention and mitigation.
Xu, Fu-gang; Yang, Xing-guo; Hao, Ming-hui
2013-01-01
Dam breaks of landslide dams are always accompanied by large numbers of casualties, a large loss of property, and negative influences on the downstream ecology and environment. This study uses the Jiadanwan landslide dam, created by the Wenchuan earthquake, as a case study example. Several laboratory experiments are carried out to analyse the dam-break mechanism of the landslide dam. The different factors that impact the dam-break process include upstream flow, the boulder effect, dam size, and channel discharge. The development of the discharge channel and the failure of the landslide dam are monitored by digital video and still cameras. Experimental results show that the upstream inflow and the dam size are the main factors that impact the dam-break process. An excavated discharge channel, especially a trapezoidal discharge channel, has a positive effect on reducing peak flow. The depth of the discharge channel also has a significant impact on the dam-break process. The experimental results are significant for landslide dam management and flood disaster prevention and mitigation. PMID:23844387
Dams and transnational advocacy: Political opportunities in transnational collective action
NASA Astrophysics Data System (ADS)
Fu, Teng
Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even facilitate the opening of relatively closed IPOS. In contrast, under a relatively closed DPOS and open IPOS, transnational anti-dam advocacy can hardly exist. Without the domestic anti-dam pressure from below, international anti-dam efforts from above are less likely to affect state dam policies or open up closed DPOS.
Qualitative simulation of bathymetric changes due to reservoir sedimentation: A Japanese case study.
Bilal, Ahmed; Dai, Wenhong; Larson, Magnus; Beebo, Qaid Naamo; Xie, Qiancheng
2017-01-01
Sediment-dynamics modeling is a useful tool for estimating a dam's lifespan and its cost-benefit analysis. Collecting real data for sediment-dynamics analysis from conventional field survey methods is both tedious and expensive. Therefore, for most rivers, the historical record of data is either missing or not very detailed. Available data and existing tools have much potential and may be used for qualitative prediction of future bathymetric change trend. This study shows that proxy approaches may be used to increase the spatiotemporal resolution of flow data, and hypothesize the river cross-sections and sediment data. Sediment-dynamics analysis of the reach of the Tenryu River upstream of Sakuma Dam in Japan was performed to predict its future bathymetric changes using a 1D numerical model (HEC-RAS). In this case study, only annually-averaged flow data and the river's longitudinal bed profile at 5-year intervals were available. Therefore, the other required data, including river cross-section and geometry and sediment inflow grain sizes, had to be hypothesized or assimilated indirectly. The model yielded a good qualitative agreement, with an R2 (coefficient of determination) of 0.8 for the observed and simulated bed profiles. A predictive simulation demonstrated that the useful life of the dam would end after the year 2035 (±5 years), which is in conformity with initial detailed estimates. The study indicates that a sediment-dynamic analysis can be performed even with a limited amount of data. However, such studies may only assess the qualitative trends of sediment dynamics.
NASA Astrophysics Data System (ADS)
Wu, Ying; Bao, Hongyan; Yu, Hao; Zhang, Jing; Kattner, Gerhard
2015-11-01
Suspended particles from the lower Changjiang were collected monthly from 2003 to 2011, which corresponds to the three construction periods of the Three Gorges Dam. Organic carbon (%OC), organic carbon to total nitrogen molar ratio, stable carbon isotope, and terrestrial biomarkers were examined. Rating curve studies were applied for the temporal trend analysis. The composition of particulate lignin phenols exhibited clear annual and periodic variations but only minor seasonal changes. Lignin phenol ratios (vanillyl/syringyl and cinnamyl/vanillyl) indicated that the terrigenous organic matter (OM) was primarily composed of woody and nonwoody tissue derived from angiosperm plants. The low-lignin phenol yields (Λ8) in combination with higher acid to aldehyde ratios reflected a substantial contribution from soil OM to the particle samples or modifications during river transport. The temporal shift of the lignin phenol vegetation index with the sediment load during the flood seasons revealed particulate organic matter (POM) erosion from soils and the impact of hydrodynamic processes. The dam operations affected the seasonal variability of terrigenous OM fluxes, although the covariation of lignin and sediment loads with discharged water implies that unseasonal extreme conditions and climate change most likely had larger influences, because decreases in the sediment load and lignin flux alter the structure and composition of particulate OM (POM) on interannual time scales, indicating that they may be driven by climate variability. The modification of the composition and structure of POM will have significant impacts on regional carbon cycles and marine ecosystems.