Sample records for dam construction project

  1. Innovative resettlement schemes planned for the Numata Dam project

    NASA Astrophysics Data System (ADS)

    Nakayama, Mikiyasu

    2003-10-01

    The Numata Dam, planned for the Tone River basin of Gunma Prefecture, was the largest dam construction project ever considered in Japan. This dam construction project, however, did not materialize. The proposal for the Numata Dam was first launched in 1959, at a time when the Tokyo Metropolitan area was mushrooming, both in population and industrial activity. The Numata Dam was supposed to be a prioritized dam construction project to alleviate the then anticipated water shortage in the Tokyo Metropolitan area. The Numata Dam plan experienced fierce opposition from those who would have been obliged to resettle, whereas those in Tokyo and the surrounding metropolitan area welcomed the plan. The major concern of the planned Numata Dam was the number of resettlers, which was then estimated to be around 3000 families. The resettlement plan developed for the Numata Dam included some innovative concepts, which may be applicable even today, for dam construction projects in the developing world. The plan included such ideas as (a) having resettlers share existing farmland with the present owners provided improvements were made to increase productivity, (b) paying rent to resettlers, and (c) establishing the Tone River Development Agency. After more than a decade of debate, both at national and local levels, the Numata Dam project was finally discarded through a decision of the Prime Minister in 1972. The resettlement schemes elaborated for the Numata Dam still appear to be innovative. Such schemes may be applied to projects in the developing world, in particular, in nations that are about to take off with economic development. Copyright

  2. Osage River Basin, Osage River, Missouri, Harry S. Trumman Dam & Reservoir. Multiple-Purpose Project. Operation and Maintenance Manual. Appendix 7, Volume 2. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    PROJECT S TYPE OF REPORT & PERIOD COVEREDOSAGE RIVER BASIN ConStruction Foundation OSAGE RIVER MISSOURI Report from September 1966 HARRY S. TRUMAN DAM...OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT VOLUME II TABLE OF...09r IWNI’(ANSAS CITY M?5OU ....... 11 1 O IA R, MISSOURI HARRY S TRUMA DAM & 1K5(V01 = CONSTRUCT"ON FOUNDATION REPORT IGEOLOGIC UNIT DESCRIPTIONS

  3. 75 FR 15458 - Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... conditions in the affected areas without further development and assumes that irrigation operations would... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...

  4. 54. Downstream face of Agua Fria project's diversion dam showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. Downstream face of Agua Fria project's diversion dam showing initial masonry construction and poured concrete capping. Photographer Mark Durben, 1986. Source: Salt River Project. - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  5. Quantifying the extent of river fragmentation by hydropower dams in the Sarapiquí River Basin, Costa Rica

    USGS Publications Warehouse

    Anderson, Elizabeth P.; Pringle, Catherine M.; Freeman, Mary C.

    2008-01-01

    Costa Rica has recently experienced a rapid proliferation of dams for hydropower on rivers draining its northern Caribbean slope. In the Sarapiquí River Basin, eight hydropower plants were built between 1990 and 1999 and more projects are either under construction or proposed. The majority of these dams are small (<15 m tall) and operate as water diversion projects.While the potential environmental effects of individual projects are evaluated prior to dam construction, there is a need for consideration of the basin-scale ecological consequences of hydropower development. This study was a first attempt to quantify the extent of river fragmentation by dams in the Sarapiquí River Basin.Using simple spatial analyses, the length of river upstream from dams and the length of de-watered reaches downstream from dams was measured. Results indicated that there are currently 306.8 km of river (9.4% of the network) upstream from eight existing dams in the Sarapiquí River Basin and 30.6 km of rivers (0.9% of the network) with significantly reduced flow downstream from dams. Rivers upstream from dams primarily drain two life zones: Premontane Rain Forest (107.9 km) and Lower Montane Rain Forest (168.2 km).Simple spatial analyses can be used as a predictive or planning tool for considering the effects of future dams in a basin-scale context. In the Sarapiquí River Basin, we recommend that future dam projects be constructed on already dammed rivers to minimize additional river fragmentation and to protect remaining riverine connectivity.

  6. 76 FR 54766 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...

  7. 10. Downstream face of Mormon Flat Dam under construction. Cement ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Downstream face of Mormon Flat Dam under construction. Cement storage shed is at center right. Photographer unknown, September 1924. Source: Salt River Project. - Mormon Flat Dam, On Salt River, Eastern Maricopa County, east of Phoenix, Phoenix, Maricopa County, AZ

  8. National Dam Safety Program. Cadet Mine Tailings Dam (MO 30715), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1980-02-01

    Safety Inspection of Dams" are not available. These studies should be performed by a professional engineer experienced in the design and construction...engineer experienced in the design and construction of tailings dams. An inspection and maintenance program should be initiated. Periodic inspections...Page No. SECTION 1 - PROJECT INFORMATION 1.1 General 1 1.2 Description of Project 1 1.3 Pertinent Data 2 SECTION 2 - ENGINEERING DATA 2.1 Design 5 2.2

  9. Multiple-Purpose Project, Osage River Basin, Osage River, Missouri. Harry S. Truman Dam & Reservoir Operation and Maintenance Manual. Appendix VII. Volume 1. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    RIVER MISSOURI Report from September 1966 HARRY S. TROMAN DAM & RESERVOIR November 1979 OPERATION AND MAINTENANCE MANUAL 6 PERFORMING DRG. REPORT N4040E...Two of this report ) VII- I- xxiv ............................. .... ... .... ... . .2. . . OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT CHAPTER 1 INTRODUCTION 1-01. Location and Description of Project: Harry S

  10. Solomon Gulch hydroelectric project takes shape

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)

  11. 8. Historic photo taken during construction of the Lost River ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic photo taken during construction of the Lost River Diversion Dam and House. Labeled as follows, 'View showing walk construction North side. Group in foreground, left to right: - J.M. McLean, I.S. Voorhees, Asst Eng'r, A.B. Clevland, engineer... W.W. Patch, Project Engineer.' Negative # 95. Facing east. - Klamath Basin Project, Lost River Diversion Dam House, Lost River near intersection of State Highway 140 & Hill Road, Klamath Falls, Klamath County, OR

  12. Health impacts of large dams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lerer, L.B.; Scudder, T.

    1999-03-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects.

  13. Erosion risk analysis by GIS in environmental impact assessments: a case study--Seyhan Köprü Dam construction.

    PubMed

    Sahin, S; Kurum, E

    2002-11-01

    Environmental Impact Assessment (EIA) is a systematically constructed procedure whereby environmental impacts caused by proposed projects are examined. Geographical Information Systems (GIS) are crucially efficient tools for impact assessment and their use is likely to dramatically increase in the near future. GIS have been applied to a wide range of different impact assessment projects and dams among them have been taken as the case work in this article. EIA Regulation in force in Turkey requires the analysis of steering natural processes that can be adversely affected by the proposed project, particularly in the section of the analysis of the areas with higher landscape value. At this point, the true potential value of GIS lies in its ability to analyze spatial data with accuracy. This study is an attempt to analyze by GIS the areas with higher landscape value in the impact assessment of dam constructions in the case of Seyhan-Köprü Hydroelectric Dam project proposal. A method needs to be defined before the overlapping step by GIS to analyze the areas with higher landscape value. In the case of Seyhan-Köprü Hydroelectric Dam project proposal of the present work, considering the geological conditions and the steep slopes of the area and the type of the project, the most important natural process is erosion. Therefore, the areas of higher erosion risk were considered as the Areas with Higher Landscape Value from the conservation demands points of view.

  14. Project Operations: Flood Control Operations and Maintenance Policies

    DTIC Science & Technology

    1996-10-30

    President and an internal review performed by the Corps task group shortly after failure of the Teton Dam , we have undertaken numerous actions to modify our...practice for design, construction and operation of Corps reservoir projects. One important item as a result of the Teton Dam failure and the review...1 Glossary 1-4 1-2 CHAPTER 2 - Dam Operations Management Purpose 2-1 2-1 Policy 2-2 2-1 Emergency Plan 2-3 2-1 Dam Safety Training 2-4 2-2

  15. Removing Dams: Project-Level Policy and Scientific Research Needs (Invited)

    NASA Astrophysics Data System (ADS)

    Graber, B.

    2010-12-01

    More than 800 dams have been removed around the country, mostly “small” dams, under 25 feet in height. The total number of removals, however, is small relative to the number of deteriorating dams and the ecological impacts those structures continue to have on native riverine species and natural river function. The number of dam removal projects is increasing as aging dams continue to deteriorate and riverine species continue to decline. Practitioners and regulators need to find cost-effective project approaches that minimize short-term environmental impacts and maximize long-term benefits while keeping project costs manageable. Dam removals can be a regulatory challenge because they inherently have short-term impacts in order to achieve larger, self-sustaining, long-term benefits. These short-term impacts include sediment movement, construction access roads, and habitat conversion from lacustrine to riverine. Environmental regulations are designed to prevent degradation and have presented challenges for projects designed to benefit the environment. For example, a short-term release of sediment may exceed water quality standards for some period of time, but lead to a long-term beneficial project. Other regulatory challenges include permitting the loss of wetland area for increased native river function, or allowing the release of some level of contaminated sediment when the downstream sediment is similarly contaminated. Dam removal projects raise a range of engineering and scientific questions on effective implementation techniques such as appropriate sediment management approaches, construction equipment access approaches, invasive species management, channel/floodplain reconstruction, and active versus passive habitat rehabilitation. While practitioners have learned and refined implementation approaches over the last decade, more input is needed from researchers to help assess the effectiveness of those techniques, and to provide more effective techniques. Applied research is needed to provide management tools for practitioners on questions such as: How do we determine the quantity of sediment that is acceptable to release downstream without causing long-term harm to habitat? How can we estimate how much sediment rivers naturally carry in places where there are no sediment gauges? Will the release of coarse-grain sediment help build habitat structure downstream or will it smother habitat? What is the trajectory of habitat quality in an impoundment wetland and is it justifiable to use self-sustainability as an argument to allow a reduction in wetland area for native river habitat? Will having construction equipment working in the flowing river channel do less harm than dewatering a river channel for a longer period of time? American Rivers staff have collectively had an active involvement in more than one hundred dam removal projects. In this presentation, an American Rivers geomorphologist will pose the questions that need to be answered to reduce project-level policy challenges and allow the implementation of cost-effective dam removal projects.

  16. 114. Photocopy of original construction drawing, 14 August 1935. (Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. Photocopy of original construction drawing, 14 August 1935. (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (M-5-8, Sheet No. 14) SPILLWAY DAM FISHWAY ENTRANCE BAY DIFFUSION CHAMBER BEAN DETAILS. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  17. Potential effects of ongoing and proposed hydropower development on terrestrial biological diversity in the Indian Himalaya.

    PubMed

    Pandit, Maharaj K; Grumbine, R Edward

    2012-12-01

    Indian Himalayan basins are earmarked for widespread dam building, but aggregate effects of these dams on terrestrial ecosystems are unknown. We mapped distribution of 292 dams (under construction and proposed) and projected effects of these dams on terrestrial ecosystems under different scenarios of land-cover loss. We analyzed land-cover data of the Himalayan valleys, where dams are located. We estimated dam density on fifth- through seventh-order rivers and compared these estimates with current global figures. We used a species-area relation model (SAR) to predict short- and long-term species extinctions driven by deforestation. We used scatter plots and correlation studies to analyze distribution patterns of species and dams and to reveal potential overlap between species-rich areas and dam sites. We investigated effects of disturbance on community structure of undisturbed forests. Nearly 90% of Indian Himalayan valleys would be affected by dam building and 27% of these dams would affect dense forests. Our model projected that 54,117 ha of forests would be submerged and 114,361 ha would be damaged by dam-related activities. A dam density of 0.3247/1000 km(2) would be nearly 62 times greater than current average global figures; the average of 1 dam for every 32 km of river channel would be 1.5 times higher than figures reported for U.S. rivers. Our results show that most dams would be located in species-rich areas of the Himalaya. The SAR model projected that by 2025, deforestation due to dam building would likely result in extinction of 22 angiosperm and 7 vertebrate taxa. Disturbance due to dam building would likely reduce tree species richness by 35%, tree density by 42%, and tree basal cover by 30% in dense forests. These results, combined with relatively weak national environmental impact assessment and implementation, point toward significant loss of species if all proposed dams in the Indian Himalaya are constructed. ©2012 Society for Conservation Biology.

  18. 23 CFR 630.803 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...

  19. 23 CFR 630.803 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...

  20. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  1. Assessment of Useful Plants in the Catchment Area of the Proposed Ntabelanga Dam in the Eastern Cape Province, South Africa

    PubMed Central

    2017-01-01

    Background The developmental projects, particularly construction of dams, result in permanent changes of terrestrial ecosystems through inundation. Objective The present study was undertaken aiming at documenting useful plant species in Ntabelanga dam catchment area that will be impacted by the construction of the proposed dam. Methods A total of 55 randomly selected quadrats were used to assess plant species diversity and composition. Participatory rural appraisal (PRA) methods were used to identify useful plant species growing in the catchment area through interviews with 108 randomly selected participants. Results A total of 197 plant species were recorded with 95 species (48.2%) utilized for various purposes. Use categories included ethnoveterinary and herbal medicines (46 species), food plants (37 species), construction timber and thatching (14 species), firewood (five species), browse, live fence, and ornamental (four species each), and brooms and crafts (two species). Conclusion This study showed that plant species play an important role in the daily life and culture of local people. The construction of Ntabelanga dam is, therefore, associated with several positive and negative impacts on plant resources which are not fully integrated into current decision-making, largely because of lack of multistakeholder dialogue on the socioeconomic issues of such an important project. PMID:28828397

  2. Geologic factors pertinent to the proposed A. J. Wiley Hydroelectric Project No. 2845, Bliss, Idaho

    USGS Publications Warehouse

    Malde, Harold E.

    1981-01-01

    The A.J. Wiley Hydroelectric Project is a proposal by the Idaho Power Company to develop hydroelectricity near Bliss, Idaho, by building a dam on the Snake River (fig. 1). The proposed dam would impound a narrow reservoir as deep as 85 feet in a free-flowing reach of the river that extends from the upper reach of water impounded by the Bliss Dam to the foot of the Lower Salmon Falls Dam, nearly 8 miles farther upstream. The proposed dam would be built in three sections: a spillway section and a powerhouse (intake) section to be constructed of concrete in the right-handed part, and an embankment section to be constructed as a zoned-fill of selected earth materials in the left-hand part. (Right and left are to be understood in the sense of looking downstream.) In August, 1979, the Idaho Power Company was granted a 3-year permit (Project No. 2845) by the Federal Energy Regulatory Commission (FERC) to make site investigations and environmental studies in the project area. A year later, on August 26, 1980, the company applied to FERC for a license to construct the project. On October 8, 1980, as explained in a letter by William W. Lindsay, Director of the Office of Electric Power Regulation, the company was given 90 days to correct certain deficiencies in the application. Because several of the deficiencies identified by Mr. Lindsay pertain to geologic aspects of the project, his letter is attached to this report as Appendix A. Hereafter in this report, the deficiencies listed by Mr. Lindsay are identified by the numerical entries in his letter. The Idaho Power Company is referred to as the applicant.

  3. National Dam Safety Program. Stony Brook Watershed Dam Site Number 7 (NJ00344), Raritan River Basin, Stony Brook, Mercer County, New Jersey. Phase 1 Inspection Report.

    DTIC Science & Technology

    1980-02-01

    for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1

  4. Study on Reventment-Protected and Non-Bottom-Protected Plunge Pool of High Arch Dam

    NASA Astrophysics Data System (ADS)

    Yingkui, Wang; Quxiu, Cao; Fanhui, Kong

    2018-05-01

    Lots of high arch dam have the characteristics of “High head, Large discharge and Narrow river valley”, therefore, the security researches of energy dissipation were always the focus in these hydro-projects. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the water plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the river overburden and water cushion were deep in dam site, which is becoming a new characteristic of these hydro-projects. Accordingly, the deep water cushion can be used for the energy dissipation design, such as the “Reventment-Protected and Non-Bottom-Protected Plunge Pool”, which has the advantage of more simplified project design and more economy investment.

  5. 76. AVALON DAM Photographic copy of historic photo, 1939 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    76. AVALON DAM - Photographic copy of historic photo, 1939 (original print in '1939 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown VIEW OF CCC WORKERS COMPLETING CONSTRUCTION OF SUSPENSION BRIDGE - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  6. Army Corps of Engineers: Actions Needed to Improve Cost Sharing for Dam Safety Repairs

    DTIC Science & Technology

    2015-12-01

    at 15 percent when modifications result from new hydrologic or seismic data, or changes in state-of-the-art design or construction criteria deemed...due to changes in state-of-the-art design or construction criteria (state-of-the-art provision)—since the enactment of the enabling legislation in...safety repair projects funded for design or construction from fiscal year 20076 to fiscal year 2016, we analyzed Corps dam safety documents and

  7. The Impact of the Dachaoshan Dam on Seasonal Hydrological Dynamics in the Main Stream of the Mekong River

    NASA Astrophysics Data System (ADS)

    Kameyama, S.; Shimazaki, H.; Nohara, S.; Fukushima, M.; Kudo, K.; Sato, T.

    2008-12-01

    In the Mekong River watershed, traditional social and industrial systems have long existed in harmony with water and biological resources. Since the 1950s, many dam-construction projects have been started to develop power and water resources to meet increasing demand for energy and food production. Since the 1970s, there have been temporary interruptions to these projects because of civil war or regional volatility of international relations. Many of these projects have been restarted in the last 15 years. This raises international interest, as there are transboundary issues cross-border issues related to both development assistance and environmental conservation. By 2008, two Chinese dams had already been completed (the Manwan dam in 1996 and the Dachaoshan dam in 2003) on the Mekong River in Yunnan province. Dam construction has some positive impacts, such as electricity production, management of water resources, and flood control. However, upstream control of water discharge can have negative impacts on traditional agricultural systems and fisheries downstream from the dams, such as drastic changes in flow volume and sediment load. We used hydrological simulation of the watershed to quantify the impact of the construction of the Dachaoshan dam by comparing annual water discharge and sediment transport before and after the dam was completed. Our main objectives were to use watershed hydrologic modeling to simulate changes to annual hydrological parameters and sediment transport, and to map spatio-temporal changes of these data before and after dam construction. Our study area covered the part of the Mekong River main channel that extends about 100 km downstream from the junction of the borders of Myanmar, Thailand, and the Lao People's Democratic Republic. We used five data validation points at 25-km intervals along this section of the river and calculated model parameters every 1 km. The years we modeled were 1990 (began dam construction) and 2006 (after dam completed). We used the MIKE-SHE and MIKE11-Enterprise (developed by DHI) to calculate seasonal changes of water level, water velocity, and sediment transport. These models provided both water discharge and sediment transport dynamics at each modeled point along the river. The sediment budget was calculated as the difference of sediment load by volume between adjacent modeled points. All parameters used in the model were calibrated with field survey data; the river structure and water flows were measured in November 2007. To validate our simulated results we used historical water-level records from the towns of Chensean and Chencone. To determine the relationship between water discharge and sediment load, we analyzed the turbidity of monthly river water samples collected in the study region between November 2007 and November 2008. Our watershed runoff models simulated water discharge and sediment load at 1-km intervals and 1-h time steps for 1990 and 2006. The model results were compiled in GIS format and maps were produced to provide simple spatial displays of modeled parameters. Our simulations show that after construction of the dam, there was a moderate decrease in peak discharge volume and water velocity during the rainy season from August to September.

  8. Dams and Intergovernmental Transfers

    NASA Astrophysics Data System (ADS)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  9. Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warf, Don; Livingston, Scott

    2009-04-16

    In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less

  10. Using 3D acoustic telemetry to assess the response of resident salmonids to strobe lights in Lake Roosevelt, Washington: Chief Joseph Kokanee Enhancement Feasibility Study, 2001-2002 annual report

    USGS Publications Warehouse

    Perry, R.W.; Farley, M.J.; Hansen, G.S.; Shurtleff, D.J.; Rondorf, D.W.; LeCaire, R.

    2003-01-01

    In 1995, the Chief Joseph Kokanee Enhancement Project was established to mitigate the loss of anadromous fish due to the construction of Chief Joseph and Grand Coulee dams. The objectives of the Chief Joseph Enhancement Project are to determine the status of resident kokanee (Oncorhynchus nerka) populations above Chief Joseph and Grand Coulee dams and to enhance kokanee and rainbow trout (Oncorhynchus mykiss) populations. Studies conducted at Grand Coulee Dam documented substantial entrainment of kokanee through turbines at the third powerhouse.

  11. Geographical Overview of the Three Gorges Dam and Reservoir, China - Geologic Hazards and Environmental Impacts

    USGS Publications Warehouse

    Highland, Lynn M.

    2008-01-01

    The Three Gorges Dam and Reservoir on the Yangtze River, China, has been an ambitious and controversial project. The dam, the largest in the world as of 2008, will provide hydropower, help to manage flood conditions, and increase the navigability of the Yangtze River. However, this massive project has displaced human and animal populations and altered the stability of the banks of the Yangtze, and it may intensify the seismic hazard of the area. It has also hindered archeological investigations in the reservoir and dam area. This report, originally in the form of a Microsoft PowerPoint presentation, gives a short history and overview of the dam construction and subsequent consequences, especially geologic hazards already noted or possible in the future. The report provides photographs, diagrams, and references for the reader's further research - a necessity, because this great undertaking is dynamic, and both its problems and successes continue to evolve. The challenges and consequences of Three Gorges Dam will be closely watched and documented as lessons learned and applied to future projects in China and elsewhere.

  12. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    DTIC Science & Technology

    1997-01-01

    to present many complex problems of site selection, proper construction techniques, and equipment design . The project first received serious...Bonneville Dam amply lived up to the hopes and dreams of its promoters and designers . In the short term, Bonneville supplied essential power for the...plan for the Columbia River. It designated Grand Coulee as the key upriver project and Bonneville as the lowermost in the chain . Report data on the

  13. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army... Corporate Operations, Southwestern Power Administration, One West Third, Tulsa, OK 74103, (918) 595-6680 or...

  14. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot

    PubMed Central

    Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi

    2016-01-01

    Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world’s largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10–20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased—particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for fishes than the consequences of global warming. Limits upon dam construction should therefore be a priority action for conserving fish biodiversity in the Indo-Burma hotspot. This would minimize synergistic impacts attributable to dams plus global warming, and help ensure the continued provision of ecosystem services represented by the Lower Mekong fishery. PMID:27532150

  15. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.

    PubMed

    Kano, Yuichi; Dudgeon, David; Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shibukawa, Koichi; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi; Utsugi, Kenzo

    2016-01-01

    Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for fishes than the consequences of global warming. Limits upon dam construction should therefore be a priority action for conserving fish biodiversity in the Indo-Burma hotspot. This would minimize synergistic impacts attributable to dams plus global warming, and help ensure the continued provision of ecosystem services represented by the Lower Mekong fishery.

  16. 78 FR 66911 - Notice of Availability of Draft Environmental Assessment; City of New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... City of New York's existing Cannonsville Dam, which impounds its Cannonsville Water Supply Reservoir. The dam and reservoir are located on the West Branch of the Delaware River, near the Township of... EA) which analyzes the potential environmental effects of construction and operation of the project...

  17. 18 CFR 4.81 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power... and nature of any new roads that would be built for the purpose of conducting the studies; and (2) Work plan for new dam construction. For any development within the project that would entail new dam...

  18. Final Independent External Peer Review Report Supplemental Major Rehabilitation Evaluation Report for Center Hill Dam, Caney Fork River, DeKalb County, Tennessee

    DTIC Science & Technology

    2013-09-25

    level will not overtop the main embankment dam but will encroach into the 3.6-feet of freeboard allotted for wind and wave run-up. This encroachment...In particular, short-term impacts on noise, air quality, water quality, migratory birds , fisheries, and traffic during construction have not been...term effects of project construction, specifically the short-term, temporary impacts on noise, air quality, water quality, migratory birds , fisheries

  19. 77 FR 51022 - Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...

  20. 76 FR 18541 - Wediko Children's Services; Notice of Declaration of Intention and Soliciting Comments, Protests...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... dam; (3) a proposed 350-foot-long, 18-to-24-inch-diameter above-ground steel penstock, routed along a... government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that... significantly modified the project's pre-1935 design or operation. l. Locations of the Application: Copies of...

  1. Emergency Fish Restoration Project; Final Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LeCaire, Richard

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleyemore » (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.« less

  2. 33. Photographic copy of construction drawing, dated 4/1925, in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of construction drawing, dated 4/1925, in possession of SCIP Office, Coolidge, AZ. United States Indian Service, Irrigation. CONSTRUCTION CAMP - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  3. 6. Photographic copy of photograph (Source: Salt River Project Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of photograph (Source: Salt River Project Archives, Tempe, Lubken collection, #R-295) Transformer house under construction. View looking north. October 5, 1908. - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ

  4. 5. Photographic copy of photograph (Source: Salt River Project Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of photograph (Source: Salt River Project Archives, Tempe, Lubken collection, #R-273) Transformer house under construction. View looking north. July 1, 1908. - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ

  5. 32 CFR 644.2 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...

  6. 32 CFR 644.2 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...

  7. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  8. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  9. Environmental impacts of Brazil's Tucuruí Dam: unlearned lessons for hydroelectric development in Amazonia.

    PubMed

    Fearnside, P M

    2001-03-01

    Brazil's Tucuruí Dam provides valuable lessons for improving decision-making on major public works in Amazonia and elsewhere. Together with social impacts, which were reviewed in a companion paper, the project's environmental costs are substantial. Monetary costs include costs of construction and maintenance and opportunity costs of natural resources (such as timber) and of the money invested by the Brazilian government. Environmental costs include forest loss, leading to both loss of natural ecosystems and to greenhouse gas emissions. Aquatic ecosystems are heavily affected by the blockage of fish migration and by creation of anoxic environments. Decay of vegetation left in the reservoir creates anoxic water that can corrode turbines, as well as producing methane and providing conditions for methylation of mercury. Defoliants were considered for removing forest in the submergence area but plans were aborted amid a public controversy. Another controversy surrounded impacts of defoliants used to prevent regrowth along the transmission line. Mitigation measures included archaeological and faunal salvage and creation of a "gene bank" on an island in the reservoir. Decision-making in the case of Tucuruí was virtually uninfluenced by environmental studies, which were done concurrently with construction. The dam predates Brazil's 1986 requirement of an Environmental Impact Assessment. Despite limitations, research results provide valuable information for future dams. Extensive public-relations use of the research effort and of mitigation measures such as faunal salvage were evident. Decision-making was closely linked to the influence of construction firms, the military, and foreign financial interests in both the construction project and the use of the resulting electrical power (most of which is used for aluminum smelting). Social and environmental costs received virtually no consideration when decisions were made, an outcome facilitated by a curtain of secrecy surrounding many aspects of the project. Despite improvements in Brazil's system of environmental impact assessment since the Tucuruí reservoir was filled in 1984, many essential features of the decision-making system remain unchanged.

  10. 12. Close up view of construction on the downstream face. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Close up view of construction on the downstream face. Track at lower center conveyed aggregate from the stream bed to the mixing plant. Photographer unknown, October 15, 1924. Source: Salt River Project. - Mormon Flat Dam, On Salt River, Eastern Maricopa County, east of Phoenix, Phoenix, Maricopa County, AZ

  11. THE NEW NORRIS HOUSE: A SUSTAINABLE HOME FOR THE 21ST CENTURY

    EPA Science Inventory

    In 1933 the Tennessee valley Authority constructed a model community, Norris, Tennessee, as part of the Norris Dam construction project. A key feature of this New Deal village was the Norris House, a series of home designs built as models for modern, efficient, and sustainable...

  12. NOA at the Calaveras Dam Replacement Project (CDRP) - Challenges and Solutions

    NASA Astrophysics Data System (ADS)

    Erskine, B.

    2012-12-01

    The San Francisco Public Utilities Commission is one year into construction of the Calaveras Dam Replacement Project (CDRP), a new earthen dam east of Sunol designed to withstand an M 7.1 earthquake on the nearby active Calaveras fault. The zoned earthen dam will be constructed primarily of on-site materials, many of which contain NOA. The upstream shell will be composed of Franciscan complex blueschist which contains crocidolite. This material will be blasted and processed at an on-site quarry. The impermeable core of the dam will be constructed of clay-rich alluvium that contains asbestos derived from Franciscan rocks. This material will be excavated from the south end of the reservoir and transported several miles to the dam. Currently, approximately 3 million yards of Franciscan complex material is being excavated and disposed of within permitted on-site engineered landfills. NOA-bearing rocks that include serpentinite, greenschist, blueschist, and eclogite contain variable amounts and assemblages of chrysotile, actinolite, crocidolite, tremolite, and winchite-class amphiboles. All of these are detected in air samples collected within a sophisticated air monitoring array and analyzed by TEM. The CDRP represents the largest construction project involving NOA in the country. As such, applying regulations that were designed for building materials and routine construction sites, and controlling airborne emissions on such a massive scale, is a major challenge requiring innovative solutions. Because construction occurs simultaneously at distinct and distant parts of the site, and the rugged topography of the site induces complex meteorological conditions, it is sometimes difficult to ascertain the driving activity and location of a source that caused a trigger level exceedance at a perimeter monitoring station. One helpful tool is forensic correlation of source material and air test data using speciation of amphiboles. At the CDRP, we are developing the ability to correlate rock mineralogy at a location with the species of amphiboles identified on air samples using TEM. Using amphibole species as a fingerprinting tool, we have been successful in determining whether an exceedance of a trigger level was caused from onsite or offsite sources. In one case, multiple exceedances by an unusual mix of chrysotile and amphiboles (crocidolite, actinolite, tremolite, and Libby-class amphiboles in the same sample) narrowed the source to one of two locations: Disposal Site 3 where a mix of materials from the entire site is disposed of, and water recycled in the decontamination zone wheel wash equipment. Using perimeter air monitoring around and between each location it was possible to identify the wheel wash as the source. As a result, the wheel wash system, track out procedures, and road wetting protocol have been re-engineered to eliminate the potential for significant offsite emissions. These and other examples will describe how the SFPUC NOA team is managing the field determination of NOA, on-site control measures, and perimeter air monitoring to assure that construction is conducted in a safe manner and no offsite exposures to the public occur.

  13. Interaction of Dams and Landslides--Case Studies and Mitigation

    USGS Publications Warehouse

    Schuster, Robert L.

    2006-01-01

    In the first half of the 20th century, engineering geology and geotechnical engineering were in their infancy, and dams were often built where landslides provided valley constrictions, often without expert site investigation. Only the most important projects were subjected to careful geologic examination. Thus, dams were often built without complete understanding of the possible geotechnical problems occurring in foundations or abutments. Most of these dams still exist, although many have undergone costly repairs because of stability or leakage problems. Today, however, every effort is made in the selection of damsites, including those sited on landslides, to provide foundations and abutments that are generally impervious and capable of withstanding the stresses imposed by the proposed dam and reservoir, and possible landslides. By means of a literature search, technical interviews, and field inventory, I have located 254 large (at least 10 m high) dams worldwide that directly interact with landslides; that is, they have been built on pre-existing landslides or have been subjected to landslide activity during or after construction. A table (Appendix table A) summarizes dam characteristics, landslide conditions, and remedial measures at each of the dams. Of the 254 dams, 164 are earthfill, 23 are rockfill, and 18 are earthfill-rockfill; these are flexible dam types that generally perform better on the possibly unstable foundations provided by landslides than do more rigid concrete dams. Any pre-existing landslides that might impinge on the foundation or abutments of a dam should be carefully investigated. If a landslide is recognized in a dam foundation or abutment, the landslide deposits commonly are avoided in siting the dam or are removed during stripping of the dam foundation and abutment contacts. Contrarily, it has often been found to be technically feasible and economically desirable to site and construct dams on known landslides or on the remnants of these features. In these cases, proven preventive and remedial measures have been used to ensure the stability of the foundations and abutments, and to reduce seepage to acceptable levels.

  14. UPLOAD: THE NEW NORRIS HOUSE – A SUSTAINABLE HOME FOR THE 21ST CENTURY

    EPA Science Inventory

    In 1933 the Tennessee Valley Authority constructed a model community, Norris, Tennessee, as part of the Norris Dam construction project. A key feature of this New Deal village was the Norris House, a series of home designs built as models for modern, efficient, and sustain...

  15. Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print located at U.S. Bureau of Reclamation Pacific Northwest Regional Office, Boise, Idaho). GOVERNMENT FORCES CONSTRUCTION CAMP AT THE BOISE RIVER DIVERSION DAMSITE BEFORE BEGINNING OF CONSTRUCTION ON DIVERSION STRUCTURE - Boise Project, Boise River Diversion Dam, Across Boise River, Boise, Ada County, ID

  16. Social Impact Studies: An Expository Analysis

    ERIC Educational Resources Information Center

    Shields, Mark A.

    1975-01-01

    Analyzed are some selected studies on the social impact of resources development and construction projects including dams, highways, nuclear power plants and strip mines. The analytical and methodological problem of assessing differential impacts is stressed. (BT)

  17. Spokane Tribal Hatchery, 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.

    2003-03-01

    The Spokane Tribal Hatchery (Galbraith Springs) project originated from the Northwest Power Planning Council (NPPC) 1987 Columbia Basin Fish and Wildlife Program. The goal of this project is to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake fisheries adversely affected by the construction and operation of Grand Coulee Dam. The objective is to produce kokanee salmon and rainbow trout for release into Lake Roosevelt for maintaining a viable fishery. The goal and objective of this project adheres to the NPPC Resident Fish Substitution Policy and specifically to the biological objectives addressed in the NPPC Columbiamore » River Basin Fish and Wildlife Program to mitigate for hydropower related fish losses in the blocked area above Chief Joseph/Grand Coulee Dams.« less

  18. Water, Watts, and Wilds Hydropower and Competing Uses in New England.

    DTIC Science & Technology

    1981-08-01

    the loci of substantial developments of second homes, and of tourism and recreational activities. These uses depend on either stable lake levels or...income from tourism which depends on the use of the lake. There is also concern that the construction of new dams or the recon- struction of breached...15205. 75.9 UNDEVELOPED DAM SITES Massachusetts 70% Plant Factor, 15% Interest Connecticut River Basin D AM C OMMUNITY PROJECT NAME GH kCAPACITY

  19. 14. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE PIERS - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  20. How to meet the increasing demands of water, food and energy in the future?

    NASA Astrophysics Data System (ADS)

    Shi, Haiyun; Chen, Ji; Sivakumar, Bellie; Peart, Mervyn

    2017-04-01

    Regarded as a driving force in water, food and energy demands, the world's population has been increasing rapidly since the beginning of the 20th century. According to the medium-growth projection scenario of the United Nations, the world's population will reach 9.5 billion by 2050. In response to the continuously growing population during this century, water, food and energy demands have also been increasing rapidly, and social problems (e.g., water, food, and energy shortages) will be most likely to occur, especially if no proper management strategies are adopted. Then, how to meet the increasing demands of water, food and energy in the future? This study focuses on the sustainable developments of population, water, food, energy and dams, and the significances of this study can be concluded as follows: First, we reveal the close association between dams and social development through analysing the related data for the period 1960-2010, and argue that construction of additional large dams will have to be considered as one of the best available options to meet the increasing water, food and energy demands in the future. We conduct the projections of global water, food and energy consumptions and dam development for the period 2010-2050, and the results show that, compared to 2010, the total water, food and energy consumptions in 2050 will increase by 20%, 34% and 37%, respectively. Moreover, it is projected that additional 4,340 dams will be constructed by 2050 all over the world. Second, we analyse the current situation of global water scarcity based on the related data representing water resources availability (per capita available water resources), dam development (the number of dams), and the level of economic development (per capita gross domestic product). At the global scale, water scarcity exists in more than 70% of the countries around the world, including 43 countries suffering from economic water scarcity and 129 countries suffering from physical water scarcity. At the continental scale, most countries of Africa, the south and west Asia, and the central Europe are suffering from water scarcity. Third, with comprehensive consideration of population growth as the major driving force, water resources availability as the basic supporting factor, and topography as the important constraint, we address the question of future dam development and predict the locations of future large dams around the world. The results show that there will be 1,433 large dams built in the future, mainly in the Tibet Plateau and the Yunnan-Guizhou Plateau in Asia, the East African Plateau and the western part of Africa, the Andes Mountains and the Brazilian Plateau region in South America, the Rocky Mountains in North America, the Alps in Europe, and the Murray-Darling Basin in Oceania. Taking into account of the current situation of global water scarcity, these large dams are most likely to be constructed in countries that have abundant total available water resources or per capita available water resources, no matter whether they are experiencing "economic water scarcity" or have sufficient financial support.

  1. A system shift in tidal choking due to the construction of Yangshan Harbour, Shanghai, China

    NASA Astrophysics Data System (ADS)

    Guo, Wenyun; Wang, Xiao Hua; Ding, Pingxing; Ge, Jianzhong; Song, Dehai

    2018-06-01

    Tidal choking is a geometric feature caused by a narrowed channel. Construction of the Yangshan Harbour, Shanghai, China obstructed three key channels and intensively changed the local geometry and topography. In this study nine numerical experiments based on the Finite-Volume Community Ocean Model are conducted to study the project's influence on tidal characteristics. Results show that stronger tidal choking happened at the East Entrance after project, mainly due to the jet induced water-level drop forced by Bernoulli law and the longer and narrower geometry. The stronger tidal choking forces a faster flow and larger tidal energy flux at the choked channel while reducing the tidal amplitude in the Inner Harbour Area (IHA). The scouring on this channel reduces the choking effect but further enlarges tidal energy flux. Moreover, damming the channels decrease the tidal amplitude at the lee side of tidal propagating direction while increasing the amplitude on the stoss side. The dams also decrease the tidal current on both sides, and meanwhile develop two patches with stronger current aside the dam. The project induced changes in tidal characteristics are complex in space, and perturbations in bathymetry increase this complexity. Yangshan Harbour's construction induces little changes in the total tidal energy density in the IHA, but induces obvious changes in the spatial distribution of tidal energy. Although this study is site-specific, the findings may be applicable to tidal dynamics in land reclamation close to open seas, such as the dramatic reclamation of islands in the South China Sea.

  2. The Grand Ethiopian Renaissance Dam: Source of cooperation or contention?

    USGS Publications Warehouse

    Teferi Taye, Meron; Tadesse, Tsegaye; Senay, Gabriel; Block, Paul

    2016-01-01

    This paper discusses the challenges and benefits of the Grand Ethiopian Renaissance Dam (GERD), which is under construction and expected to be operational on the Blue Nile River in Ethiopia in a few years. Like many large-scale projects on transboundary rivers, the GERD has been criticized for potentially jeopardizing downstream water security and livelihoods through upstream unilateral decision making. In spite of the contentious nature of the project, the authors argue that this project can provide substantial benefits for regional development. The GERD, like any major river infrastructure project, will undeniably bring about social, environmental, and economic change, and in this unique case has, on balance, the potential to achieve success on all fronts. It must be stressed, however, that strong partnerships between riparian countries are essential. National success is contingent on regional cooperation.

  3. Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

    1999-07-01

    The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

  4. 25. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1928. Vol I. Irrigation District #4, California and Southern Arizona, RG 75, BIA-Phoenix, BOx 40, National Archives, Pacific Southwest Region.) SACATON DAM SHOWING CONSTRUCTION OF CONDUIT AND EXCAVATION OF GRAVEL, APRIL 10, 1928 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  5. 17. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF WEIR, 1/17/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  6. 15. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE DECK, 4/5/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  7. 13. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF MAIN APRON, 12/9/24 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  8. Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodson, Guy; Pero, Vincent

    Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less

  9. 75 FR 43551 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Mohave County Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...

  10. 75 FR 81604 - Price Dam Partnership, Limited; Notice of Request for Extension of Time to Commence and Complete...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Partnership, Limited; Notice of Request for Extension of Time to Commence and Complete Construction and.... Application Type: Request for Extension of Time. b. Project No.: 12187-016. c. Date Filed: December 8, 2010. d...-year extension of time from the existing deadline of July 28, 2011 to July 28, 2013 to commence project...

  11. River flow maintenance turbine for Milner Hydroelectric Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carson, J.L.; Holveck, W.H.; Gokhman, A.

    1995-12-31

    The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net headmore » of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  13. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  14. National Dam Inspection Program. Laurel Run Dam. NDI ID Number PA-00380. DER ID Number 35-6, Pennsylvania Gas and Water Company. Susquehanna River Basin, Laurel Run, Lackawanna County, Pennsylvania Phase I Inspection Report,

    DTIC Science & Technology

    1980-04-01

    Supply. g. Design and Construction History. Laurel Run Dam was constructed in 1594 by Martin Cawley, a contractor from Archbald. The construction was...1T6Ace joly PHASE I INSPECTION REPORT -4 NATIONAL DAM INSPECTION PROGRAM Lime LAUREL RUN DAM PENNSYLVANIA GAS AND WATER COMPANY RESERVOIR AREA

  15. Sustainability of dams-an evaluation approach

    NASA Astrophysics Data System (ADS)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the very specific context of dam construction will be identified. Special focus will be on the constraints arising from the need to jointly evaluate qualitative and quantitative aspects and the methodological potential of multi-criteria evaluation in this respect.

  16. 30 CFR 715.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... existing or new dams without the approval of the regulatory authority. The permittee shall design, locate... design precipitation event within 10 days. (viii) During construction of dams subject to this section... adjacent to each dam within 30 days of certification of design pursuant to this section. (4) All dams...

  17. The World Commission on Dams: A fundamental step towards integrated water resources management and poverty reduction? A pilot case in the Lower Zambezi, Mozambique

    NASA Astrophysics Data System (ADS)

    Scodanibbio, Lucia; Mañez, Gustavo

    The Cahora Bassa dam in the Lower Zambezi has undoubtedly brought varied economic benefits (such as hydroelectricity) to Mozambique. There is also, however, evidence of certain negative impacts that have increased the vulnerability of downstream populations. Specifically, current water management practices in the Zambezi have affected people’s livelihoods by the frequent unpredictable releases of water that wash away riverbank crops, impoverish fish stocks and fish habitat, and threaten the valuable shrimp exports. These releases have also worsened the effects of large floods, for example the floods of 2001. The ecosystem of the Zambezi delta, which is a Ramsar site, has also suffered since Cahora Bassa’s regulation. The Mozambican government is proposing to construct a new dam downstream of Cahora Bassa at Mphanda Nkuwa. In the feasibility study, there was no due consideration of rural downstream communities and their livelihoods. This has left many potentially affected people uninformed and vulnerable to the risks associated with the new development. The new dam is likely to worsen the already severe impacts of Cahora Bassa. The World Commission on Dams (WCD) developed seven strategic priorities, designed to inform all decisions related to future dam developments. These priorities follow principles of public participation, social equity, environmental sustainability, economic efficiency and accountability. The WCD proposed best-practice guidelines for both addressing existing dams and for any future ones which are planned. According to the WCD, affected communities have a right to participate in the decision to build a dam, they should be the first to benefit from the project, and the rivers on which their livelihoods are based should be protected. Stakeholder participation is one of the fundamental components of integrated water resources management (IWRM). For effective participation in dam projects, affected people need to be empowered, have access to information and adequate capacity. In this context JA!, a Mozambican environmental NGO, is undertaking a project to share WCD recommendations with affected people along the Zambezi River. JA! has adopted a “bottom-up” approach to ensure that the people’s interests are included in government projects. This approach could give Mozambique the power to safeguard the environment while sustaining peoples’ livelihoods.

  18. Brazil's Balbina Dam: Environment versus the legacy of the Pharaohs in Amazonia

    NASA Astrophysics Data System (ADS)

    Fearnside, Philip M.

    1989-07-01

    The Balbina Dam in Brazil's state of Amazonas floods 2360 km2 of tropical forest to generate an average of only 112.2 MW of electricity. The flat topography and small size of the drainage basin make output small. Vegetation has been left to decompose in the reservoir, resulting in acidic, anoxic water that will corrode the turbines. The shallow reservoir contains 1500 islands and innumerable stagnant bays where the water's residence time will be even longer than the average time of over one year. Balbina was built to supply electricity to Manaus, a city that has grown so much while the dam was under construction that other alternatives are already needed. Government subsidies explain the explosive growth, including Brazil's unified tariff for electricity. Alternative power sources for Manaus include transmission from more distant dams or from recently discovered oil and natural gas deposits. Among Balbina's impacts are loss of potential use of the forest and displacement of about one third of the surviving members of a much-persecuted Amerindian tribe: the Waimiri-Atroari. The dam was closed on 1 October 1987 and the first of five generators began operation in February 1989. The example of Balbina points to important ways that the decision-making process could be improved in Brazil and in the international funding agencies that have directly and indirectly contributed to the project. Environmental impact analyses must be completed prior to decisions on overall project implementation and must be free of influence from project proponents. The current environmental impact assessment system in Brazil, as in many other countries, has an undesirable influence on science policy, in addition to failing to address the underlying causes of environmentally destructive development processes and inability to halt “irreversible” projects like Balbina.

  19. Sediment budget as affected by construction of a sequence of dams in the lower Red River, Viet Nam

    NASA Astrophysics Data System (ADS)

    Lu, Xi Xi; Oeurng, Chantha; Le, Thi Phuong Quynh; Thuy, Duong Thi

    2015-11-01

    Dam construction is one of the main factors resulting in riverine sediment changes, which in turn cause river degradation or aggradation downstream. The main objective of this work is to examine the sediment budget affected by a sequence of dams constructed upstream in the lower reach of the Red River. The study is based on the longer-term annual data (1960-2010) with a complementary daily water and sediment data set (2008-2010). The results showed that the stretch of the river changed from sediment surplus (suggesting possible deposition processes) into sediment deficit (possible erosion processes) after the first dam (Thac Ba Dam) was constructed in 1972 and changed back to deposition after the second dam (Hoa Binh Dam) was constructed in 1985. The annual sediment deposition varied between 1.9 Mt/y and 46.7 Mt/y with an annual mean value of 22.9 Mt/y (1985-2010). The sediment deposition at the lower reach of the Red River would accelerate river aggradation which would change river channel capacity in the downstream of the Red River. The depositional processes could be sustained or changed back to erosional processes after more dams (the amount of sediment deposit was much less after the latest two dams Tuyen Quang Dam in 2009 and Sonla Dam in 2010) are constructed, depending on the water and sediment dynamics. This study revealed that the erosional and depositional processes could be shifted for the same stretch of river as affected by a sequence of dams and provides useful insights in river management in order to reduce flood frequency along the lower reach of the Red River.

  20. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  1. A brief history of 20th century dam construction and a look into the future

    NASA Astrophysics Data System (ADS)

    van de Giesen, Nick

    2010-05-01

    In this presentation, an overview is given of global dam building activities in the 20th century. Political, economical and hydrological factors shaped the building of large dams. The development of the relations between these three factors and dam building over time is examined. One can argue whether or not history is simply "one damn thing after another" but the second half of the 20th century suggests that history is at least reflected by the construction of one dam after another. The financial crisis of the 1930's started the first construction wave of large hydropower dams in the United States. This wave continued into the Second World War. During the Cold War, the weapon race between the USA and USSR was accompanied by a parallel neck-and-neck race in dam construction. By the 1970's, dam construction in the USA tapered off, while that in the USSR continued until its political disintegration. In China, we see two spurts in dam development, the first one coinciding with the disastrous Great Leap Forward and the second with the liberalization of the Chinese economy after the fall of the Berlin Wall. Economic and political events thus shaped to an important extent decisions surrounding the construction of large dams. Clearly, there are some hydrological prerequisites for the construction of dams. The six largest dam building nations are USSR, Canada, USA, China, Brazil, and India, all large countries with ample water resources and mountain ranges. Australia has relatively little reservoir storage for the simple fact that most of this country is flat and dry. A few countries have relatively large amounts of reservoir storage. Especially Uganda (Owens Falls), Ghana (Akosombo), and Zimbabwe (Kariba) are examples of small countries where gorges in major rivers were "natural" places for large dams and reservoirs to be built early on. It seems that, deserts aside, the average potential storage capacity lies for most continents around 10 cm or about 50% of the total yearly continental runoff. Some of the least developed countries, such as Papua New Guinea, Congo DR, and Myanmar, still have large hydropower development potential. In most countries, however, dam construction seems to have reached its peak. For the presentation, use is made of GapMinder software (www.gapminder.org), which provides direct insight in the dynamic and multi-dimensonial aspects of 20th century dam construction.

  2. Construction of a Dry Ash Dam with Soilbags and Slope Stability Analysis

    NASA Astrophysics Data System (ADS)

    Li, Hui; Song, Yingjun; Gao, Jiaorong; Li, Longhua; Zhou, Yuqi; Qi, Hui

    2017-12-01

    In thermal power plants, it is necessary to build ash dams to store fly ash, which is the by-product after the combustion of coals. To solve the problem of lacking rockfill materials in Africa, A new technology of constructing ash dams using solibags filled with local sands is proposed and the method of analyzing its slope stability is suggested. The design of the ash dam using soilbags in Lamb Thermal Power Plant of Kenya is introduced in detail. The slope stability of the soilbags-constructed ash dam was analyzed by adopting the suggested method. The results show that the soilbags filled with ash or sands have high compressive strength, and the primary dam constructed with soilbags can effectively retain the backfill ash and the stacking dam reinforced with soilbags can stand stable even with the slope of 1:1.5.

  3. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less

  4. An environmental streamflow assessment for the Santiam River basin, Oregon

    USGS Publications Warehouse

    Risley, John C.; Wallick, J. Rose; Mangano, Joseph F.; Jones, Krista L.

    2012-01-01

    The Santiam River is a tributary of the Willamette River in northwestern Oregon and drains an area of 1,810 square miles. The U.S. Army Corps of Engineers (USACE) operates four dams in the basin, which are used primarily for flood control, hydropower production, recreation, and water-quality improvement. The Detroit and Big Cliff Dams were constructed in 1953 on the North Santiam River. The Green Peter and Foster Dams were completed in 1967 on the South Santiam River. The impacts of the structures have included a decrease in the frequency and magnitude of floods and an increase in low flows. For three North Santiam River reaches, the median of annual 1-day maximum streamflows decreased 42–50 percent because of regulated streamflow conditions. Likewise, for three reaches in the South Santiam River basin, the median of annual 1-day maximum streamflows decreased 39–52 percent because of regulation. In contrast to their effect on high flows, the dams increased low flows. The median of annual 7-day minimum flows in six of the seven study reaches increased under regulated streamflow conditions between 60 and 334 percent. On a seasonal basis, median monthly streamflows decreased from February to May and increased from September to January in all the reaches. However, the magnitude of these impacts usually decreased farther downstream from dams because of cumulative inflow from unregulated tributaries and groundwater entering the North, South, and main-stem Santiam Rivers below the dams. A Wilcox rank-sum test of monthly precipitation data from Salem, Oregon, and Waterloo, Oregon, found no significant difference between the pre-and post-dam periods, which suggests that the construction and operation of the dams since the 1950s and 1960s are a primary cause of alterations to the Santiam River basin streamflow regime. In addition to the streamflow analysis, this report provides a geomorphic characterization of the Santiam River basin and the associated conceptual framework for assessing possible geomorphic and ecological changes in response to river-flow modifications. Suggestions for future biomonitoring and investigations are also provided. This study was one in a series of similar tributary streamflow and geomorphic studies conducted for the Willamette Sustainable Rivers Project. The Sustainable Rivers Project is a national effort by the USACE and The Nature Conservancy to develop environmental flow requirements in regulated river systems.

  5. Rodney Hunt supplies gates to Idaho Power's Swan Falls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-02-01

    Rodney Hunt Co. shipped two 30-foot by 28-foot fabricated steel roller gates to Idaho Power Co.'s Swan Falls Dam Project, where they will be installed as draft tube gates. Rodney Hunt said the gates, each weighing approximately 55 tons, are the largest roller gates the company has manufactured. The company supplied the gates under the terms of a contract worth more than $500,000. The gates were ordered as part of Idaho Power's rehabilitation of Swan Falls Dam, which will double the power plant's capacity to 25 MW. New units will begin producing power in 1993, and the project will bemore » completed in 1994. Elsewhere on the Snake River, Idaho Power intends to increase the capacity of its Twin Falls project to 52 MW from 10 MW. Construction is scheduled to start in June 1993.« less

  6. Synthesis of downstream fish passage information at projects owned by the U.S. Army Corps of Engineers in the Willamette River Basin, Oregon

    USGS Publications Warehouse

    Hansen, Amy C.; Kock, Tobias J.; Hansen, Gabriel S.

    2017-08-07

    The U.S. Army Corps of Engineers (USACE) operates the Willamette Valley Project (Project) in northwestern Oregon, which includes a series of dams, reservoirs, revetments, and fish hatcheries. Project dams were constructed during the 1950s and 1960s on rivers that supported populations of spring Chinook salmon (Oncorhynchus tshawytscha), winter steelhead (O. mykiss), and other anadromous fish species in the Willamette River Basin. These dams, and the reservoirs they created, negatively affected anadromous fish populations. Efforts are currently underway to improve passage conditions within the Project and enhance populations of anadromous fish species. Research on downstream fish passage within the Project has occurred since 1960 and these efforts are documented in numerous reports and publications. These studies are important resources to managers in the Project, so the USACE requested a synthesis of existing literature that could serve as a resource for future decision-making processes. In 2016, the U.S. Geological Survey conducted an extensive literature review on downstream fish passage studies within the Project. We identified 116 documents that described studies conducted during 1960–2016. Each of these documents were obtained, reviewed, and organized by their content to describe the state-of-knowledge within four subbasins in the Project, which include the North Santiam, South Santiam, McKenzie, and Middle Fork Willamette Rivers. In this document, we summarize key findings from various studies on downstream fish passage in the Willamette Project. Readers are advised to review specific reports of interest to insure that study methods, results, and additional considerations are fully understood.

  7. After Three Gorges Dam: What have we learned?

    NASA Astrophysics Data System (ADS)

    Natali, J.; Williams, P.; Wong, R.; Kondolf, G. M.

    2013-12-01

    China is at a critical point in its development path. By investing heavily in large-scale infrastructure, the rewards of economic growth weigh against long-term environmental and social costs. The construction of Three Gorges Dam, the world's largest hydroelectric project, began in 1994. Between 2002 and 2010, its 660 kilometer reservoir filled behind a 181 meter dam, displacing at least 1.4 million people and transforming Asia's longest river (the Yangtze) while generating nearly 100 billion kWh/yr of electricity -- 2.85% of China's current electric power usage. As the mega-project progenitor in a cascade of planned dams, the Three Gorges Dam emerges as a test case for how China will plan, execute and mitigate its development pathway and the transformation of its environment. Post-Project Assessments (PPA) provide a systematic, scientific method for improving the practice of environmental management - particularly as they apply to human intervention in river systems. In 2012, the Department of Landscape Architecture and Environmental Planning at University of California, Berkeley organized a symposium-based PPA for the Three Gorges Dam on the Yangtze River. Prior to this symposium, the twelve invited Chinese scientists, engineers and economists with recent research on Three Gorges Dam had not had the opportunity to present their evaluations together in an open, public forum. With a 50-year planning horizon, the symposium's five sessions centered on impacts on flows, geomorphology, geologic hazards, the environment and socioeconomic effects. Three Gorges' project goals focused on flood control, hydropower and improved navigation. According to expert research, major changes in sediment budget and flow regime from reservoir operation have significantly reduced sediment discharge into the downstream river and estuary, initiating a series of geomorphic changes with ecological and social impacts. While the dam reduces high flow stages from floods originating above the reservoir, subsequent floodplain development and degradation of levees increase downstream flood risk. As geomorphic adjustment continues, the loss of key fish and wildlife habitat will rise, a recognized but externalized environmental cost with potential mitigation measures found in protecting and restoring floodplain lakes. With significant underestimates of social impacts and project costs, the population of the surrounding area has experienced severe adverse impacts ranging from loss of ancient villages, landholdings, and livelihoods to increased threats of natural hazards -- without full compensation or public disclosure of project costs. The value of PPAs is most realized when integrated into adaptive management for river basin planning. Throughout the symposium, speakers echoed the conclusion: 'The entire Yangtze basin needs comprehensive management.' Integrated planning decisions must consider dams, water diversions, reservoir management, protection of natural areas, basin-wide land management, preservation of flood detention areas and levees, and both economic compensation and social opportunity for affected residents. The resulting analysis may influence the massive expansion of worldwide hydroelectric development as China exports its financing and dam building expertise.

  8. 60. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. McMILLAN DAM - Photographic copy of construction drawing dated April 4, 1917 (from aperture card located at Bureau of Reclamation, Salt Lake City). DETAIL CONSTRUCTION SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  9. 75 FR 74700 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 2183-078] Grand River Dam... Dam Authority. e. Name of Project: Markham Ferry Hydroelectric Project. f. Location: The project is..., Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301-0409, (918) 256-5545 or by e-mail...

  10. National Dam Safety Program. Highland Park Reservoir Dam (Inventory Number N.Y. 790), Genesee River Basin, Monroe County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    34 rga Highland Park Reservoir Dam Vi’.sual I. .. ’. •Genesee River Basin, ’!ydrolozy. ". ". . . Scabi tyMo r e C u t.,.- Js eps’ •; ::or.ation -3 :..i :n...dam impounds a municipal water storage reservoir. g. Design and Construction History The dam was designed and built around 1875. h. Normal Operating... History : Date Constructed Around 1875 Date(s) Reconstructed N/A Designer Unknown Constructed by Unknown Owner Water Department, City of Rochester, New

  11. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... shall design, locate, construct, operate, maintain, modify, and abandon or remove all dams (used either... design. (ix) A permanent identification marker, at least 6 feet high that shows the dam number assigned... located on or immediately adjacent to each dam within 30 days of certification of design pursuant to this...

  12. 63. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. McMILLAN DAM - Photographic copy of construction drawing dated July 19, 1937 (from aperture card located at Bureau of Reclamation, Salt Lake City). McMILLAN DAM - GENERAL PLAN AND SECTIONS WITH PROPOSED IMPROVEMENTS - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  13. Environmental impacts on the hydrology of ephemeral streams and alluvial aquifers

    NASA Astrophysics Data System (ADS)

    Kuells, C.; Marx, V.; Bittner, A.; Ellmies, R.; Seely, M.

    2009-04-01

    In arid and semi-arid regions alluvial groundwater resources of ephemeral streams are highly important for water supplies and ecosystems. Recent projects have studied processes of indirect recharge in situ and in detail (Dahan et al., 2008; Klaus et al., 2008). Still, little is known about the vulnerability of these aquifers to environmental impacts like surface dam constructions, land-use changes and climatic conditions as well as the time and type of response to such external impacts. With a catchment size of about 30.000 km² the Swakop River in Namibia is the largest of the country's twelve major ephemeral streams draining westwards into the Atlantic Ocean. The alluvial groundwater resources have been affected by the construction of two major surface water dams in the upper catchment as well as by abstractions for rural water supply, farming and mining downstream of the constructed dams (referred to as lower catchment). The determination of environmental impacts in the Swakop River catchment is difficult due to scarce hydrometric and water quality data. In order to obtain a better understanding of the hydrological system under changing environmental conditions a spatially distributed environmental tracer approach was applied. A longitudinal profile of groundwater samples was taken within a field study along the alluvial aquifer of the Swakop River. The samples were analysed for stable isotopes (18O, 2H), major ions and trace elements as well as for the residence time indicators CFC and SF6. The combined application of groundwater residence time analysis, stable isotope measurements and hydrochemical characterisation was used in order to associate a time scale with groundwater quality data. This method provides dated information on recharge and water quality before and after dam construction and can be used to detect environmental impacts on the hydrological system. CFC-12 analysis resulted in recharge years ranging from 1950 (0.01 pmol/l) to 1992 (1.4 pmol/l). Seven of 14 groundwater samples represent mainly groundwater recharged before or between the construction of surface water dams (1970 and 1978), the remaining samples represent groundwater recharge after dam construction. The groundwater residence time is generally short (recharge mainly after 1980) in the upper catchment and much higher (recharge mainly before 1980 and before dam construction) in the lower part of the catchment. Combining the age and isotope information shows how the surface water dams modified the pattern of groundwater recharge. The lower catchment has been partly cut off from the upper part in terms of indirect groundwater recharge by floods which means that most large floods originating in the headwaters of the Swakop River do not reach the lower alluvial aquifer anymore. The relationship between groundwater age and groundwater constituents helped to define baselines of hydrological properties (origin of water, recharge altitude) and of hydrochemical composition prior to the construction of dams (and other anthropogenic impacts). The well defined relationship between groundwater age and altitude of the river further helps to assess how fast different segments will be affected by these environmental impacts. References Dahan, O., Tatarsky, B., Enzel, Y., Kuells, C., Seely, M., Benito, G. (2008) Dynamics of Flood Water Infiltration and Ground Water Recharge in Hyperarid Desert. Ground Water, Vol. 46, 3. (6-2008), pp. 450-461. Klaus, J., Kuells, C., Dahan, O. (2008): Evaluating the recharge mechanism of the Lower Kuiseb Dune Area using mixing cell modeling and residence time data. Journal of Hydrology, v. 358, p. 304-316.

  14. Hydropower and sustainability: resilience and vulnerability in China's powersheds.

    PubMed

    McNally, Amy; Magee, Darrin; Wolf, Aaron T

    2009-07-01

    Large dams represent a whole complex of social, economic and ecological processes, perhaps more than any other large infrastructure project. Today, countries with rapidly developing economies are constructing new dams to provide energy and flood control to growing populations in riparian and distant urban communities. If the system is lacking institutional capacity to absorb these physical and institutional changes there is potential for conflict, thereby threatening human security. In this paper, we propose analyzing sustainability (political, socioeconomic, and ecological) in terms of resilience versus vulnerability, framed within the spatial abstraction of a powershed. The powershed framework facilitates multi-scalar and transboundary analysis while remaining focused on the questions of resilience and vulnerability relating to hydropower dams. Focusing on examples from China, this paper describes the complex nature of dams using the sustainability and powershed frameworks. We then analyze the roles of institutions in China to understand the relationships between power, human security and the socio-ecological system. To inform the study of conflicts over dams China is a particularly useful case study because we can examine what happens at the international, national and local scales. The powershed perspective allows us to examine resilience and vulnerability across political boundaries from a dynamic, process-defined analytical scale while remaining focused on a host of questions relating to hydro-development that invoke drivers and impacts on national and sub-national scales. The ability to disaggregate the affects of hydropower dam construction from political boundaries allows for a deeper analysis of resilience and vulnerability. From our analysis we find that reforms in China's hydropower sector since 1996 have been motivated by the need to create stability at the national scale rather than resilient solutions to China's growing demand for energy and water resource control at the local and international scales. Some measures that improved economic development through the market economy and a combination of dam construction and institutional reform may indeed improve hydro-political resilience at a single scale. However, if China does address large-scale hydropower construction's potential to create multi-scale geopolitical tensions, they may be vulnerable to conflict - though not necessarily violent - in domestic and international political arenas. We conclude with a look toward a resilient basin institution for the Nu/Salween River, the site of a proposed large-scale hydropower development effort in China and Myanmar.

  15. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affectmore » wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).« less

  16. Archaeological Testing and Survey: Testing of Three Sites and Survey of a Road Detour within Proposed Project Construction Zones, Burlington Dam Flood Control Project Area, Upper Souris River, North Dakota,

    DTIC Science & Technology

    1980-01-01

    reported in Burgess et al. (1973:19). Low bottom species in the study area include American elm (Ulmus americanus), green ash (Fraxinus pennsylvanica...deposits with "Calgon" before water screening. Because of slow permeability clay is very slippery when it becomes wet and can be hazardous to workers. The

  17. National Dam Safety Program. Waterloo Dam (I.D. Number NY 709), Oswego River Basin, Seneca County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-09-30

    GEOTECHNICAL DATA 4 2.2 DESIGN RECORDS 4 2.3 CONSTRUCTION RECORDS 4 2.4 OPERATION RECORD 4 2.5 EVALUATION OF DATA 4 3 VISUAL INSPECTION 5 3.1 FINDINGS 5...g. Design and Construction History This dam was constructed in two stages as parts of Contracts E and G for Section I of the Cayuga and Seneca Canal...determine the final elevation of the footings at the time of construction to assure a proper foundation. 2.2 DESIGN RECORDS This dam was designed in

  18. Feasibility of groundwater recharge dam projects in arid environments

    NASA Astrophysics Data System (ADS)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  19. 44. Reinforcement construction to Pleasant Dam. Photographer unknown, 1935. Source: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Reinforcement construction to Pleasant Dam. Photographer unknown, 1935. Source: Huber Collection, University of California, Berkeley, Water Resources Library. - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  20. 18 CFR 4.81 - Contents of application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power... approximate locations and nature of any new roads that would be built for the purpose of conducting the studies; and (2) Work plan for new dam construction. For any development within the project that would...

  1. 6. GENERAL CONSTRUCTION VIEW ALONG AXIS OF DAM FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. GENERAL CONSTRUCTION VIEW ALONG AXIS OF DAM FROM THE EAST ABUTMENT.... Volume XVII, No. 18, December 18, 1939. - Prado Dam, Embankment, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  2. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 12478-003] Gibson Dam... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  3. [Ecological risk assessment of dam construction for terrestrial plant species in middle reach of Lancangjiang River, Southwest China].

    PubMed

    Li, Xiao-Yan; Dong, Shi-Kui; Liu, Shi-Liang; Peng, Ming-Chun; Li, Jin-Peng; Zhao, Qing-He; Zhang, Zhao-Ling

    2012-08-01

    Taking the surrounding areas of Xiaowan Reservoir in the middle reach of Lancangjiang River as study area, and based on the vegetation investigation at three sites including electricity transmission area (site 1), electricity-transfer substation and roadsides to the substation (site 2), and emigration area (site 3) in 1997 (before dam construction), another investigation was conducted on the vegetation composition, plant coverage, and dominant species at the same sites in 2010 (after dam construction), aimed to evaluate the ecological risk of the dam construction for the terrestrial plant species in middle reach of Lancangjiang River. There was an obvious difference in the summed dominance ratio of dominant species at the three sites before and after the dam construction. According the types of species (dominant and non-dominant species) and the changes of plant dominance, the ecological risk (ER) for the plant species was categorized into 0 to IV, i.e., no or extremely low ecological risk (0), low ecological risk (I), medium ecological risk (II), high ecological risk (III), and extremely high ecological risk (IV). As affected by the dam construction, the majority of the species were at ER III, and a few species were at ER IV. The percentage of the plant species at ER III and ER IV at site 3 was higher than that at sites 1 and 2. The decrease or loss of native plants and the increase of alien or invasive plants were the major ecological risks caused by the dam construction. Effective protection strategies should be adopted to mitigate the ecological risk of the dam construction for the terrestrial plants at species level.

  4. 177. Photographic copy of original construction drawing dated June 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    177. Photographic copy of original construction drawing dated June 15, 1931 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; CONCRETE COOLING TESTS FOR HOOVER DAM. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  5. 20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION BRIDGE, GANTRY CRANE AND STRUCTURAL PIERS. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  6. National Dam Safety Program. Wappingers Falls Dam (I.D. Number N.Y. 3, D.E.C. 613A), Hudson River Basin, Dutchess County, New York. Phase 1 Inspection Report

    DTIC Science & Technology

    1980-09-30

    Classification 2I e. Ownership 2f. Purpose of Dam 2 g. Design and Construction History 2h. Normal Operating Procedure 2 1.3 PERTINENT DATA 2 a. Drainage...4 2.2 SUBSURFACE INVESTIGATION 4 2.3 DAM AND APPURTENANT STRUCTURES 4 2.4 CONSTRUCTION RECORDS 4 2.5 OPERATION RECORDS 2.6 EVALUATION OF DATA 5 4...12 a. Visual Observations 12 b. Design and Construction Data 12 c. Stability Analysis 12 d. Operating Records 13 e. Post- Construction Changes 13 f

  7. 75 FR 16090 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-384] Grand River Dam.... Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Project. f. Location: The proposed non... Council, Grand Dam River Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 256-5545. i. FERC Contact...

  8. Damming the rivers of the Amazon basin

    NASA Astrophysics Data System (ADS)

    Latrubesse, Edgardo M.; Arima, Eugenio Y.; Dunne, Thomas; Park, Edward; Baker, Victor R.; D'Horta, Fernando M.; Wight, Charles; Wittmann, Florian; Zuanon, Jansen; Baker, Paul A.; Ribas, Camila C.; Norgaard, Richard B.; Filizola, Naziano; Ansar, Atif; Flyvbjerg, Bent; Stevaux, Jose C.

    2017-06-01

    More than a hundred hydropower dams have already been built in the Amazon basin and numerous proposals for further dam constructions are under consideration. The accumulated negative environmental effects of existing dams and proposed dams, if constructed, will trigger massive hydrophysical and biotic disturbances that will affect the Amazon basin’s floodplains, estuary and sediment plume. We introduce a Dam Environmental Vulnerability Index to quantify the current and potential impacts of dams in the basin. The scale of foreseeable environmental degradation indicates the need for collective action among nations and states to avoid cumulative, far-reaching impacts. We suggest institutional innovations to assess and avoid the likely impoverishment of Amazon rivers.

  9. Damming the rivers of the Amazon basin.

    PubMed

    Latrubesse, Edgardo M; Arima, Eugenio Y; Dunne, Thomas; Park, Edward; Baker, Victor R; d'Horta, Fernando M; Wight, Charles; Wittmann, Florian; Zuanon, Jansen; Baker, Paul A; Ribas, Camila C; Norgaard, Richard B; Filizola, Naziano; Ansar, Atif; Flyvbjerg, Bent; Stevaux, Jose C

    2017-06-14

    More than a hundred hydropower dams have already been built in the Amazon basin and numerous proposals for further dam constructions are under consideration. The accumulated negative environmental effects of existing dams and proposed dams, if constructed, will trigger massive hydrophysical and biotic disturbances that will affect the Amazon basin's floodplains, estuary and sediment plume. We introduce a Dam Environmental Vulnerability Index to quantify the current and potential impacts of dams in the basin. The scale of foreseeable environmental degradation indicates the need for collective action among nations and states to avoid cumulative, far-reaching impacts. We suggest institutional innovations to assess and avoid the likely impoverishment of Amazon rivers.

  10. Billy Shaw Dam and Reservoir : Environmental Assessment and Finding of No Significant Impacts.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.

    This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning ofmore » the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.« less

  11. 27. Evening view of downstream face of Pleasant Dam under ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Evening view of downstream face of Pleasant Dam under construction. Part of construction camp housing is visible in foreground. Photographer unknown, 1927. Source: MWD. - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  12. 145. Photographic copy of original construction drawing dated April 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    145. Photographic copy of original construction drawing dated April 10, 1928 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; PLAN, ELEVATION AND SECTIONS, ARCH-GRAVITY DAM. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  13. The Public Sector Construction Industry: Analysis of Single-Project Partnering

    DTIC Science & Technology

    1992-12-22

    thesis advisor, Dr. Fred Moavenzadeh for his guidance and encouragement. Colonel Larry S. Bonine , U.S. Army (Retired) and the members of his Partnering...PROJECT (CkG) ENGINEERS MANAGERS PR::JECT PARINERING TEAM Figure 4-4. Central Artery/Tunnel Organizational Chart. 116 MR. Larry Bonine an employee of the...joint venture team. MR. Bonine is an ex-Army Colonel and was the Corps District Engineer in Mobile, Alabama who oversaw the Oliver Lock and Dam and

  14. Integrated Research Methods for Applied Urban Hydrogeology of Karst Sites

    NASA Astrophysics Data System (ADS)

    Epting, J.; Romanov, D. K.; Kaufmann, G.; Huggenberger, P.

    2008-12-01

    Integrated and adaptive surface- and groundwater monitoring and management in urban areas require innovative process-oriented approaches. To accomplish this, it is necessary to develop and combine interdisciplinary instruments that facilitate adequately quantifying cumulative effects on groundwater flow regimes. While the characterization and modeling of flow in heterogeneous and fractured media has been investigated intensively, there are no well-developed long-term hydrogeological research sites for gypsum karst. Considering that infrastructures in karst regions, particularly in gypsum, are prone to subsidence, severe problems can arise in urban areas. In the 1880's, a river dam was constructed on gypsum-containing rock, Southeast of Basel, Switzerland. Over the last 30 years, subsidence of the dam and an adjacent highway has been observed. Surface water infiltrates upstream of the dam, circulates in the gravel deposits and in the weathered bedrock around and beneath the dam and exfiltrates downstream into the river. These processes enhance karstification processes in the soluble units of the gypsum. As a result an extended weathering zone within the bedrock and the development of preferential flow paths within voids and conduits can be observed. To prevent further subsidence, construction measures were conducted in two major project phases in 2006 and 2007. The highway was supported by a large number of pillars embedded in the non- weathered rock and by a sealing pile wall, to prevent infiltrating river water circulating around the dam and beneath the foundation of the highway. To safeguard surface and subsurface water resources during the construction measures, an extensive observation network was set up. Protection schemes and geotechnical investigations that are necessary for engineering projects often provide "windows of opportunity", bearing the possibility to change perceptions concerning the sustainable development of water resources and coordinate future measures. Theories describing the evolution of karst systems are mainly based on conceptual models. Although these models are based on fundamental and well established physical and chemical principles that allow studying important processes from initial small scale fracture networks to the mature karst, systems for monitoring the evolution of karst phenomena are rare. Integrated process-oriented investigation methods are presented, comprising the combination of multiple data sources (lithostratigraphic information of boreholes, extensive groundwater monitoring, dye tracer tests, geophysics) with high-resolution numerical groundwater modeling and model simulations of karstification below the dam. Subsequently, different scenarios evaluated the future development of the groundwater flow regime, the karstification processes as well as possible remediation measures. The approach presented assists in optimizing investigation methods, including measurement and monitoring technologies with predictive character for similar subsidence problems within karst environments in urban areas.

  15. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall: Dam Mitigate Flood Risk in Mekong

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Wei; Lu, Hui; Ruby Leung, L.

    Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. A large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, withmore » more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.« less

  16. 75 FR 42728 - Copper Valley Electric Association, Inc.; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Federal Power Act, proposing to study the feasibility of the Silver Lake Hydroelectric Project, located on Silver Lake and Duck River, in the Valdez-Cordova Census Area, Alaska. The sole purpose of a preliminary...-high roller-compacted concrete dam constructed at the outfall of Silver Lake to Duck River; (2) Silver...

  17. 78 FR 41056 - Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757- 004), and Red... be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located in Bossier...

  18. The short-term impacts of development-induced displacement on wealth and subjective well-being in the Brazilian Amazon

    PubMed Central

    RANDELL, HEATHER

    2017-01-01

    Summary Displacement due to development projects such as dams, mines, and urban infrastructure often leads to livelihood decline among affected communities. The challenge, therefore, lies in implementing projects that achieve national or regional development goals while also generating positive social and economic outcomes for displaced populations. This paper uses a longitudinal, mixed-methods design to understand the short-term changes in wealth and subjective well-being of households displaced due to construction of the Belo Monte Dam in the Brazilian Amazon. The households were compensated by either cash or credit for their lost land and assets, and were then responsible for finding and purchasing new property. Using pre- and post-displacement household survey and semi-structured interview data, as well as data from a small comparison group, I find that wealth increased for the majority of the study population and that socioeconomic inequality decreased, as poorer households experienced greater improvements in housing conditions, assets, and property ownership. In addition, subjective well-being improved for most households, particularly among those who did not own land at baseline, those who gained assets such as vehicles, those who remained closer to the original study area, and those who remained in close proximity to other households from the study population. Moving to an urban destination was strongly associated with declines in well-being, as was moving far from family or friends. These results suggest that investing sufficient resources in a compensation-based resettlement program can benefit households displaced by large infrastructure projects in the short term, but additional data collection is needed after the completion of dam construction to determine whether these benefits are sustained over the longer term. PMID:28316364

  19. 56. McMILLAN DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. McMILLAN DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City) McMILLAN RESERVOIR HEADGATES - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  20. 78 FR 21933 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... feasibility of the Palo Verde Diversion Dam Hydroelectric Project (Palo Verde Diversion Dam Project or project... Southern California Edison transmission line located approximately one mile west of the Palo Verde Dam. An...

  1. Gypsum-karst problems in constructing dams in the USA

    USGS Publications Warehouse

    Johnson, K.S.

    2008-01-01

    Gypsum is a highly soluble rock and is dissolved readily to form caves, sinkholes, disappearing streams, and other karst features that typically are also present in limestones and dolomites. Gypsum karst is widespread in the USA and has caused problems at several sites where dams were built, or where dam construction was considered. Gypsum karst is present (at least locally) in most areas where gypsum crops out, or is less than 30-60 m below the land surface. These karst features can compromise on the ability of a dam to hold water in a reservoir, and can even cause collapse of a dam. Gypsum karst in the abutments or foundation of a dam can allow water to pass through, around, or under a dam, and solution channels can enlarge quickly, once water starts flowing through such a karst system. The common procedure for controlling gypsum karst beneath the dam is a deep cut-off trench, backfilled with impermeable material, or a close-spaced grout curtain that hopefully will fill all cavities. In Oklahoma, the proposed Upper Mangum Dam was abandoned before construction, because of extensive gypsum karst in the abutments and impoundment area. Catastrophic failure of the Quail Creek Dike in southwest Utah in 1989 was due to flow of water through an undetected karstified gypsum unit beneath the earth-fill embankment. The dike was rebuilt, at a cost of US $12 million, with construction of a cut-off trench 600 m long and 25 m deep. Other dams in the USA with severe gypsum-karst leakage problems in recent years are Horsetooth and Carter Lake Dams, in Colorado, and Anchor Dam, in Wyoming. ?? 2007 Springer-Verlag.

  2. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  3. 30 CFR 715.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...

  4. 30 CFR 715.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...

  5. 30 CFR 715.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...

  6. 52. Photographic copy of construction drawing, U.S. Reclamation Service, December ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photographic copy of construction drawing, U.S. Reclamation Service, December 1911 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Keechelus Dam - general plan of dam site." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  7. 81. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City) UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. GATE DETAILS - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  8. 57. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. McMILLAN DAM - Photographic copy of construction drawing dated January 15, 1913 (from aperture card located at Bureau of Reclamation, Salt Lake City) POWER LIFTING MECHANISM FOR HEADGATES - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  9. 80. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    80. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City). UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. PARTIAL PLAN AND ELEVATION - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  10. 62. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. McMILLAN DAM - Photographic copy of construction drawing dated April 2, 1917 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver). RECORD DRAWING OF RAILROAD DIKE - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  11. 184. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    184. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM RESEARCH FOR HOOVER DAM; LAYOUT OF CONTRACTION JOINT MEASURING DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  12. 186. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    186. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; MISCELLANEOUS VERTICAL SECTIONS; THROUGH PANELS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  13. 179. Photographic copy of original construction drawing dated July, 1932 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    179. Photographic copy of original construction drawing dated July, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; TERMINAL BOARD FOR PANEL DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  14. 181. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    181. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; LOCATION OF TERMINAL BOARDS AND CONDUCTS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. 180. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    180. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONRETE RESEARCH FOR HOOVER DAM; INVAR METER DETAILS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  16. 185. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    185. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; CONTRACTION JOINT METER INSTALLATION. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  17. 182. Photographic copy of original construction drawing dated March 28, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    182. Photographic copy of original construction drawing dated March 28, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). VOLUME CHANGE IN MASS CONCRETE; OWYHEE DAM CONCRETE RESEARCH FOR HOOVER DAM; LAYOUT OF INTERNAL STRAIN MEASURING DEVICES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  18. 75 FR 46918 - Gresham Municipal Utilities; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On the Red River, in.... Description of Request: The licensee proposes to amend the license for the Upper Red Lake Dam Hydroelectric... Project No. 2464), which is located immediately downstream from the Upper Red Lake Dam Project; (2) the...

  19. 77 FR 47628 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ...), proposing to study the feasibility of the DaGuerre Point Dam Hydropower Project (DaGuerre Point Dam Project or project) to be located at the U.S. Army Corps of Engineers' (USACE) DaGuerre Point Dam, on the...

  20. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... fundamental part of this mission was the construction and operation of an integrated system of dams and... by the Federal Emergency Management Agency, TVA prepares for the worst case flooding event in order... appropriate best management practices during all phases of construction and maintenance associated with the...

  1. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...

  2. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...

  3. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...

  4. 61. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. McMILLAN DAM - Photographic copy of construction drawing dated April 2, 1917 (from Record Group 115, Box 16, Denver Branch of the National Archives, Denver). RECORD DRAWING OF SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  5. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, Brian C.; Duke, Bill B.

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adultmore » and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.« less

  6. Hungry Horse Dam Fisheries Mitigation : Fish Passage and Habitat Improvement in the Upper Flathead River Basin, 1991-1996 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knotek, W.Ladd; Deleray, Mark; Marotz, Brian L.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery ofmore » fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects.« less

  7. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; McKay Dam Hydropower, LLC On May 31, 2011, McKay Dam Hydropower, LLC filed an... study the feasibility of the McKay Dam Hydroelectric Project (project) to be located at the McKay dam near Pendleton in Umatilla County, [[Page 57732

  8. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...

  9. National Dam Safety Program. Martindale Dam (NDI Number PA-00444, PennDER Number 11-17), Ohio River Basin, Trout Run, Cambria County, Pennsylvania. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    0025 UNCLASSIFIED NL m -hmmII hhh~ENDhE~E EEEEL~ ___ OHIO RIVER BASIN TROUT RUN, CAMBRIA COUNTY PENNSYLVANIA NOI No. PA 00444 ~LEVEL tPennDER No. 11-17...COUNTY, COMMONWEALTH OF PENNSYLVANIA NDI No. PA 00444 PennDER No. 11-17 --PHASE--I -INSPECT-I ON--REPRT m - i-’ JNATIONAL.DAM. AFETY PROGRAM I,.ti/t UK...Construction History - The dam was designed by Andrew B. Crichton , Civil and Mining Engineer, Johnstown, Pennsylvania. The dam was constructed in 1909 and 1910

  10. Impact of beaver dams on abundance and distribution of anadromous salmonids in two lowland streams in Lithuania.

    PubMed

    Virbickas, Tomas; Stakėnas, Saulius; Steponėnas, Andrius

    2015-01-01

    European beaver dams impeded movements of anadromous salmonids as it was established by fishing survey, fish tagging and redd counts in two lowland streams in Lithuania. Significant differences in abundancies of other litophilic fish species and evenness of representation by species in the community were detected upstream and downstream of the beaver dams. Sea trout parr marked with RFID tags passed through several successive beaver dams in upstream direction, but no tagged fish were detected above the uppermost dam. Increase in abundances of salmonid parr in the stream between the beaver dams and decrease below the dams were recorded in November, at the time of spawning of Atlantic salmon and sea trout, but no significant changes were detected in the sections upstream of the dams. After construction of several additional beaver dams in the downstream sections of the studied streams, abundance of Atlantic salmon parr downstream of the dams decreased considerably in comparison with that estimated before construction.

  11. 88. AVALON DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    88. AVALON DAM - Photographic copy of construction drawing dated February 9, 1912 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver) METHOD OF CLOSING UP OLD GATE OPENINGS IN SPILLWAY AND ARRANGEMENT OF TURBINES, OPERATING CYLINDER GATES - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  12. Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study

    NASA Astrophysics Data System (ADS)

    Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.

    2012-09-01

    Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.

  13. Riverine based eco-tourism: Trinity River non-market benefits estimates

    USGS Publications Warehouse

    Douglas, A.J.; Taylor, J.G.

    1998-01-01

    California's Central Valley Project (CVP) was approved by voters in a statewide referendum in 1933. CVP referendum approval initiated funding for construction of important water development projects that had far reaching effects on regional water supplies. The construction of Trinity Dam in 1963 and the subsequent transbasin diversion of Trinity River flow was one of several CVP projects that had noteworthy adverse environmental and regional economic impacts. The Trinity River is the largest tributary of the Klamath River, and has its headwaters in the Trinity Alps of north-central California. After the construction of Trinity Dam in 1963, 90% of the Trinity River flow at Lewiston was moved to the Sacramento River via the Clear Creek Tunnel. Before 1963, the Trinity River was a major recreation resource of Northern California. The loss of streamflow has had a marked adverse impact on Trinity River-related recreation activities and the size and robustness of Trinity River salmon, steelhead, shad, and sturgeon runs. Trinity River water produces hydropower during its transit via Bureau of Reclamation canals and pumps to the northern San Joaquin Valley, where it is used for irrigated agriculture. The benefits provided by Trinity River instream flow-related environmental amenities were estimated with the travel cost method (TCM). Trinity River non-market benefits are about $406 million per annum, while the social cost of sending water down the Trinity River ranges from $17 to $42 million per annum, depending on the exact flow. We also discuss the relative magnitude of Trinity River survey data contingent value method (CVM) benefits estimates.

  14. 78 FR 38026 - Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... Impact Statement (draft EIS) for the Martin Dam Hydroelectric Project No. 349- 173 (Martin Dam Project...

  15. Seismic Stability Evaluation of Ririe Dam and Reservoir Project. Report 1. Construction History and Field and Laboratory Studies. Volume 1. Main Text

    DTIC Science & Technology

    1991-09-01

    truck Service truck Steel casing, 8-foot diameter with 3/4-inch wall thickness, was installed as the shaft was advanced. A shaft cover, constructed of... steel mats. was hoisted over the shaft at night for security. To obtain in-situ density tests at selected intervals in the bottom of the shaft...subcontractor installed the three wells using an air-rotary rig, and driving steel casing as the wells were advanced. He then perforated the casings

  16. Characteristics of the first stage of constructing the Hoabinh Dam in Vietnam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bogachenko, P.T.; Godunov, B.I.; Phunc Ne, T.

    1985-06-01

    As a result of an analysis of the data, investigations, and on-site observations at the Hoa-Binh Dam, Vietnam, the authors conclude: infilling of the rock mass with sand, successful for the Aswan dam, cannot be mechanically transferred to other dams; the possibility of using the energy of the river flow for removing low-quality soils in large amounts from the foundation of rock-fill dams by regulating the sequence of dumping the elements of the dam was confirmed in model investigations and successfully accomplished in the construction of the HoaBinh dam; at the site of the Hoa-Binh dam, observations of the dumpingmore » of the sand-gravel soil into water into a high shoulder did not reveal segregation of this soil, however, the data from investigations in a single borehole contradict the observations -- further on-site observation must therefore be made.« less

  17. The Three Gorges Dam Affects Regional Precipitation

    NASA Technical Reports Server (NTRS)

    Wu, Liguang; Zhang, Qiang; Jiang, Zhihong

    2006-01-01

    Issues regarding building large-scale dams as a solution to power generation and flood control problems have been widely discussed by both natural and social scientists from various disciplines, as well as the policy-makers and public. Since the Chinese government officially approved the Three Gorges Dam (TGD) projects, this largest hydroelectric project in the world has drawn a lot of debates ranging from its social and economic to climatic impacts. The TGD has been partially in use since June 2003. The impact of the TGD is examined through analysis of the National Aeronautics and Space Administration (NASA) Tropical Rainfall Measuring Mission (TRMM) rainfall rate and Moderate Resolution Imaging Spectroradiometer (MODIS) land surface temperature and high-resolution simulation using the Pennsylvania State University-National Center for Atmospheric Research (PSU-NCAR) fifth-generation Mesoscale Model (MM5). The independent satellite data sets and numerical simulation clearly indicate that the land use change associated with the TGD construction has increased the precipitation in the region between Daba and Qinling mountains and reduced the precipitation in the vicinity of the TGD after the TGD water level abruptly rose from 66 to 135 m in June 2003. This study suggests that the climatic effect of the TGD is on the regional scale (approx.100 km) rather than on the local scale (approx.10 km) as projected in previous studies.

  18. 77 FR 30518 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-403] Grand River Dam.... Project No.: 1494-403. c. Date Filed: April 11, 2012. d. Applicant: Grand River Dam Authority. e. Name of.... Tamara E. Jahnke, Assistant General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma...

  19. 77 FR 58820 - Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 1494-410] Grand River Dam.... Project No: 1494-410. c. Date Filed: August 6, 2012. d. Applicant: Grand River Dam Authority. e. Name of... River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 256-5545. i. FERC Contact: Lorance...

  20. 76 FR 9341 - Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-391] Grand River Dam.... Project No.: 1494-391. c. Date Filed: January 7, 2011. d. Applicant: Grand River Dam Authority (GRDA). e... Contact: Tamara E. Jahnke, Assistant General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, OK...

  1. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...

  2. 76 FR 40903 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2524-019] Grand River Dam.... Date Filed: January 21, 2011. d. Applicant: Grand River Dam Authority. e. Name of Project: Salina... Zumwalt-Smith, General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, OK 73401-0409. Tel: (918...

  3. Evaluating the Impact of Gilgel Gibe Dam on the Lake Turkana Water Levels: An Illustration from an Endorheic Lake in Africa

    NASA Astrophysics Data System (ADS)

    Velpuri, N.; Senay, G. B.

    2010-12-01

    Lake Turkana is one of the lakes in the Great Rift Valley, Africa. This lake has no outlet hence it is considered as closed or endorheic lake. To meet the demand of electricity in the east African region, Ethiopia is currently building Gilgel Gibe-III dam on the Omo River, which supplies up to 80% of the inflows to the Lake Turkana. On completion, this dam would be the tallest dam in Africa with a height of 241 m. As Lake Turkana is highly dependent on the inflows from the Omo River, the construction of this dam could potentially pose a threat to the downstream river valley and to Lake Turkana. This hydroelectric project is arguably one of the most controversial projects in the region. The impact of the dam on the lake is evaluated using Remote Sensing datasets and hydrologic modeling. First, lake water levels (1998-2007) were estimated using the Simplified Lake Water Balance (SLAB) approach which takes in satellite based rainfall estimates, modeled runoff and evapotranspiration data over the Turkana basin. Modeled lake levels were validated against TOPEX/POSIEDON/Jason-1 satellite altimeter data. Validation results showed that the model could capture observed trends and seasonal variations in lake levels. The fact that the lake is endorheic makes it easy to model the lake levels. Using satellite based estimates for the years 1998-2009, future scenarios for rainfall and evapotranspiration were generated using the Monte Carlo simulation approach and the impact of Gilgel Gibe-III dam on the Lake Turkana water levels is evaluated using SLAB approach. Preliminary results indicate that the impact of the dam on the lake would vary with the initial water level in the lake at the time of dam commissioning. It was found that during the initial period of dam/reservoir filling the lake level would drop up to 2-3 m (95% confidence interval). However, on average the lake would stabilize within 10 years from the date of commissioning. The variability within the lake levels due to reduced inflows after the dam commissioning were found to be within the natural variability of the lake (0-5 m). The use of cost free satellite based estimates for runoff and evapotranspiration modeling makes this approach consistent and credible. It is also easy to replicate on any other dam in the world. Results obtained from this approach are very valuable and would aid decision makers and environmentalists in proper decision making.

  4. 4. DETAIL VIEW OF TRIPLE TONGUE AND GROOVE CRIBBING USED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL VIEW OF TRIPLE TONGUE AND GROOVE CRIBBING USED IN DAM CONSTRUCTION, NORTH EAST OF EAST DAM, LOOKING NORTH - Three Bears Lake & Dams, East Dam, North of Marias Pass, East Glacier Park, Glacier County, MT

  5. Large-scale projects in the amazon and human exposure to mercury: The case-study of the Tucuruí Dam.

    PubMed

    Arrifano, Gabriela P F; Martín-Doimeadios, Rosa C Rodríguez; Jiménez-Moreno, María; Ramírez-Mateos, Vanesa; da Silva, Núbia F S; Souza-Monteiro, José Rogério; Augusto-Oliveira, Marcus; Paraense, Ricardo S O; Macchi, Barbarella M; do Nascimento, José Luiz M; Crespo-Lopez, Maria Elena

    2018-01-01

    The Tucuruí Dam is one of the largest dams ever built in the Amazon. The area is not highly influenced by gold mining as a source of mercury contamination. Still, we recently noted that one of the most consumed fishes (Cichla sp.) is possibly contaminated with methylmercury. Therefore, this work evaluated the mercury content in the human population living near the Tucuruí Dam. Strict exclusion/inclusion criteria were applied for the selection of participants avoiding those with altered hepatic and/or renal functions. Methylmercury and total mercury contents were analyzed in hair samples. The median level of total mercury in hair was above the safe limit (10µg/g) recommended by the World Health Organization, with values up to 75µg/g (about 90% as methylmercury). A large percentage of the participants (57% and 30%) showed high concentrations of total mercury (≥ 10µg/g and ≥ 20µg/g, respectively), with a median value of 12.0µg/g. These are among the highest concentrations ever detected in populations living near Amazonian dams. Interestingly, the concentrations are relatively higher than those currently shown for human populations highly influenced by gold mining areas. Although additional studies are needed to confirm the possible biomagnification and bioaccumulation of mercury by the dams in the Amazon, our data already support the importance of adequate impact studies and continuous monitoring. More than 400 hydropower dams are operational or under construction in the Amazon, and an additional 334 dams are presently planned/proposed. Continuous monitoring of the populations will assist in the development of prevention strategies and government actions to face the problem of the impacts caused by the dams. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Eliminating Contractor Inspections of Federal Water Projects Could Save Millions.

    DTIC Science & Technology

    1981-09-29

    of the Buffalo Creek, West Virginia, Mine Refuse Embankment and the 1976 Teton Dam failure in Idaho have been fairly recent reminders of the risk...project failures, heightened by the Teton Dam failure, prompted several Government-sponsored dam safety reviews in the late 1970’s. Following these reviews...inspection approach was evaluated as part of the Government-wide,’ Presidentially directed Dam Safety Review of 1977. The Bureau’s 1976 Teton Dam

  7. Landsat Image Analysis of the Rebea Agricultural Project, Mosul Dam and Lake, Northern Iraq

    NASA Astrophysics Data System (ADS)

    Welsh, W.; Alassadi, F.

    2014-12-01

    An archive of 70 good-to-excellent quality Landsat TM and ETM+ images acquired between 1984 and 2011 were identified through visual examination of the GLOVIS web portal. After careful consideration of factors relevant to agriculture in the region (e.g., crop calendar) and associated image processing needs (e.g., preference for anniversary dates), the images deemed most appropriate were downloaded. Standard preprocessing, including visual quality and statistical inspection, sub-setting to the study area, was performed, and the results combined in a database with available GIS data. The resolution merge spatial enhancement technique was applied to any ETM+ imagery to improve visual clarity and interpretability. The NDVI was calculated for all images in the time series. Unsupervised classification of images was performed for dates ranging from 1987 just before the inception of the Rebea project in 1989 through 2011. In order to reduce uncertainty related to lack of detailed ancillary and/or ground reference data, simple land cover classes were mapped, specifically: surface water, agriculture, and other. Results were able to quantify and track areas of each class over time, and showed a marked decrease in agriculture between the Iraq invasion in 2003 to the end of the study period in 2011, despite massive efforts and capital by the United States and Iraqi governments to improve agriculture in the area. Complications to understanding the role of warfare and conflict on the environment in the Mosul region include severe drought and water shortages, including effects of the Turkish GAP water resource development project in the headwaters of the Tigris-Euphrates, as well as Mosul Dam structural problems associated with geologically-unsuitable conditions upon which the dam is constructed. Now, the Islamic State in Iraq and Syria (ISIS) likely captured the Mosul Dam on the day this abstract was submitted. Our Landsat-based monitoring and analysis of the Rebea Project and Mosul Dam continues, including the acquisition of Landsat 8 imagery for 31 July 2014, just prior to the ISIS attack. Details of our completed and ongoing research will be presented.

  8. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  9. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  10. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  11. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  12. Estimating Sediment Delivery to The Rio Maranon, Peru Prior to Large-Scale Hydropower Developments Using High Resolution Imagery from Google Earth and a DJI Phantom 3 Drone

    NASA Astrophysics Data System (ADS)

    Goode, J. R.; Candelaria, T.; Kramer, N. R.; Hill, A. F.

    2016-12-01

    As global energy demands increase, generating hydroelectric power by constructing dams and reservoirs on large river systems is increasingly seen as a renewable alternative to fossil fuels, especially in emerging economies. Many large-scale hydropower projects are located in steep mountainous terrain, where environmental factors have the potential to conspire against the sustainability and success of such projects. As reservoir storage capacity decreases when sediment builds up behind dams, high sediment yields can limit project life expectancy and overall hydropower viability. In addition, episodically delivered sediment from landslides can make quantifying sediment loads difficult. These factors, combined with remote access, limit the critical data needed to effectively evaluate development decisions. In the summer of 2015, we conducted a basic survey to characterize the geomorphology, hydrology and ecology of 620 km of the Rio Maranon, Peru - a major tributary to the Amazon River, which flows north from the semi-arid Peruvian Andes - prior to its dissection by several large hydropower dams. Here we present one component of this larger study: a first order analysis of potential sediment inputs to the Rio Maranon, Peru. To evaluate sediment delivery and storage in this system, we used high resolution Google Earth imagery to delineate landslides, combined with high resolution imagery from a DJI Phantom 3 Drone, flown at alluvial fan inputs to the river in the field. Because hillslope-derived sediment inputs from headwater tributaries are important to overall ecosystem health in large river systems, our study has the potential to contribute to the understanding the impacts of large Andean dams on sediment connectivity to the Amazon basin.

  13. 2. William Beardsley standing along the Agua Fria River near ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. William Beardsley standing along the Agua Fria River near construction site of the Agua Fria project. Photographer James Dix Schuyler, 1903. Source: Schuyler, James D. 'Report on the Water Supply of the Agua Fria River, and the Storage Reservoir Project of the Agua Fria Water and Land Company For Irrigation in the Gila River Valley, Arizona,' (September 29, 1903). Arizona Historical Collection, Hayden Library, Arizona State University, Tempe, Arizona. (Typewritten.) - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  14. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    NASA Astrophysics Data System (ADS)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  15. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural type in Turkey. In addition, brief information is given about these dams and the methods of geodetic and non-geodetic monitoring measurements applied by various disciplines. The last part of the study focuses on the inference of the geodetic monitoring methods, which depend on a seven years of geodetic monitoring.

  16. Sediment and water discharge rates of Turkish Black Sea rivers before and after hydropower dam construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hay, B.J.

    1994-06-01

    Presently, the water discharge rate to the Black Sea by Turkish rivers is approximately 41 km[sup 3]/yr. The sediment discharge rate of Turkish rivers to the Black Sea is 28 x 10[sup 6] t/yr. Before construction of the hydroelectric dams, the sediment discharge rate was approximately 70 x 10[sup 6] t/yr. The sharp reduction in sediment load is largely a result of the dams near the mouths of the Yesil Irmak and Kizil Irmak rivers. Before the construction of dams, Turkish rivers contributed approximately one third of the total amount of sediment received by the Black Sea from all surroundingmore » rivers. The life-span of the major reservoirs varies from approximately only one century (Yesil Irmak river reservoirs) to several thousand years (Sakarya river reservoirs). Life-span for the large Altinkaya Dam reservoir is estimated with approximately 500 yr.« less

  17. Human immunodeficiency virus seroprevalence in an occupational cohort in a South African community.

    PubMed

    Kravitz, J D; Mandel, R; Petersen, E A; Nyaphisis, M; Human, D

    In the early years of the worldwide pandemic, there were no reported cases of acquired immunodeficiency syndrome in Lesotho, a small, mountainous country in South Africa. Since 1986, when the first case of acquired immunodeficiency syndrome was identified, reported diagnoses have risen precipitously. The initiation of the Lesotho Highlands Water Project has resulted in the influx of a migrant workforce of predominantly single males into a relatively isolated, mountainous area where human immunodeficiency virus (HIV) was previously unknown. To ascertain the HIV seroprevalence among a cohort of laborers at the Katse Dam construction site in Bokong, Lesotho. During the 5-week study period in late 1992, construction workers (age range, 15 to 59 years) who were first-time clinic users for any chief complaint were randomly selected for serological study. Surveillance complied with the Lesotho National AIDS Control Programme guidelines, which required unlinked, anonymous testing. Serum samples were screened by an enzyme-linked immunosorbent assay; the results were confirmed by the Western blot technique. Unlinked, anonymous HIV testing of 486 persons revealed a seroprevalence of 5.3% (26/486; 95% confidence interval, 3.3% to 7.3%). These data contrasted with a 0.8% seroprevalence in a similar age group in nearby villages that surrounded the construction project. Lesotho, in the early phase of the HIV/acquired immunodeficiency syndrome epidemic in Africa in the 1980s, was seemingly protected by its relative isolation. Grave concern is now warranted as the country is destined to experience a rapid rise in HIV seroprevalence. Increased surveillance, health education opportunities, and aggressive prevention activities at the Katse Dam construction site are imperative to arrest the spread of HIV from construction workers to nearby villagers.

  18. National Program for Inspection of Non-Federal Dams. Somersville Pond Dam (CT 00273), Connecticut River Basin, Somers, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    dam. . 2.2 Construction Data. No record of original construction is avail- ’.. able for this dam. A general location plan prepared by Reino E. low Hyypa...and S"’: overuse. The slopes of the shoreline are flat and generally well covered with grass and vegetation to preclude sloughing Pp. and shoreline...roadways. It is estimated that the water depths would average 9.8 feet and that velocities of flow could cause erosion, stripping of vegetation and

  19. 75 FR 73064 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... hydropower at the U.S. Army Corps of Engineers (Corps) C.W. Bill Young Lock and Dam located on the Allegheny... the proposed C.W. Bill Young Lock and Dam Projects: Lock+ Hydro Friends Fund XXXIX's project (Project... attached to the downstream side of the Corps dam which would support one frame module; (2) each frame...

  20. Project Overcoat - An Exploration of Exterior Insulation Strategies for 1-1/2-Story Roof Applications in Cold Climates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ojczyk, Cindy; Mosiman, Garrett; Huelman, Pat

    The development of an alternative method to interior-applied insulation strategies or exterior applied 'band-aids' such as heat tapes and ice belts may help reduce energy needs of millions of 1-1/2 story homes while reducing the risk of ice dam formation. A potential strategy for energy improvement of the roof is borrowed from new construction best practices: Here an 'overcoat' of a continuous air, moisture, and thermal barrier is applied on the outside of the roof structure for improved overall performance. The continuous insulation of this approach facilitates a reduction in thermal bridging which could further reduce energy consumption and bringmore » existing homes closer to meeting the Building America goals for energy reduction. Research favors an exterior approach to deep energy retrofits and ice dam prevention in existing homes. The greatest amount of research focuses on whole house deep energy retrofits leaving a void in roof-only applications. The research is also void of data supporting the hygrothermal performance, durability, constructability, and cost of roof-only exterior overcoat strategies. Yet, contractors interviewed for this report indicate an understanding that exterior approaches are most promising for mitigating ice dams and energy loss and are able to sell these strategies to homeowners.« less

  1. 12. CONSTRUCTION OF FOREBAY; SLUICEGATE IN CENTER AND ORIGINAL STONE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. CONSTRUCTION OF FOREBAY; SLUICEGATE IN CENTER AND ORIGINAL STONE DAM ABUTMENT ENCASED IN CONCRETE ON RIGHT, March 14, 1918. - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  2. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia

    PubMed Central

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments. PMID:26132139

  3. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    PubMed

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  4. Estimating NOA Health Risks from Selected Construction Activities at the Calaveras Dam Replacement Project (CDRP)

    NASA Astrophysics Data System (ADS)

    Hernandez, D. W.

    2012-12-01

    The CDRP is a major construction project involving up to 400 workers using heavy earth moving equipment, blasting, drilling, rock crushing, and other techniques designed to move 7 million yards of earth. Much of this material is composed of serpentinite, blueschist, and other rocks that contain chrysotile, crocidolite, actinolite, tremolite, and Libby-class amphiboles. To date, over 1,000 personal, work area, and emission inventory related samples have been collected and analyzed by NIOSH 7400, NIOSH 7402, and CARB-AHERA methodology. Data indicate that various CDRP construction activities have the potential to generate significant mineral fibers and structures that could represent elevated on site and off site health risks. This presentation will review the Contractors air monitoring program for this major project, followed by a discussion of predictive methods to evaluate potential onsite and offsite risks. Ultimately, the data are used for planning control strategies designed to achieve a Project Action Level of 0.01 f/cc (one tenth the Cal/OSHA PEL) and risk-based offsite target levels.

  5. 51. McMILLAN DAM Photographic copy of historic photo, 1937 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. McMILLAN DAM - Photographic copy of historic photo, 1937 (original print filed in Work Projects Misc., File E, National Archives, Washington, D.C.) photographer unknown 'CCC ENROLLEES RECONSTRUCTING McMILLAN DAM ON PECOS RIVER DAMAGED BY FLOODS - CARLSBAD FEDERAL RECLAMATION PROJECT, NEW MEXICO' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  6. Modeling the Impact of controlled flow and sediment releases for the restoration of the Nile Delta, Egypt

    NASA Astrophysics Data System (ADS)

    Al-Zaidi, B. M.; Moussa, A.; Viparelli, E.

    2017-12-01

    The construction of the High and Old Aswan Dams and of barrages significantly altered the flow and the sediment transport regimes in the Egyptian reach of the Nile River. The field data collected by the Nile Research Institute show that the post-High Aswan Dam Nile River hydrology is characterized by reductions of more than 70% in flow discharge and 98% in sediment load compared to pre-High Aswan Dam conditions. A significant portion of discharge released from the dams is diverted at the barrages for agricultural ( 80%) and municipal ( 15%) uses. Thus, virtually no water is reaching the Nile Delta and the Mediterranean Sea. Consequently, the sediment load delivered to the Mediterranean Sea is negligible compared to pre-dam conditions. Consequences of the flow regulation are delta wide wetland loss and shoreline retreat, widespread delta pollution, reduction soil quality, salination of cultivated land, wetland losses, and saltwater intrusion in the groundwater. Here we present the second part of a feasibility study for the restoration of the Nile River-Delta system characterized by controlled flow releases and sediment augmentations downstream of the High Aswan Dam. The controlled flow releases are obtained by regulating the current releases from the High Aswan Dam at the Old Aswan Dam, which is located 6.5 km downstream of the High Aswan Dam. Previous studies showed that 10 billion m3 of water can be saved annually by improving the Egyptian irrigation system. Here we propose to use the saved water to increase the water discharge to the Nile Delta, i.e., the total volume of water released from the dams does not change, what changes is the water used and the imposed hydrograph. We modulate the river flow by storing the saved water during the agriculture season upstream of the Old Aswan Dam and releasing it in the months coinciding with the natural river flood season. It is important to note that here we are considering the simplest possible scenario for water storage. In reality, additional storage volumes are available upstream of the major barrages, and these volumes can also be used during the proposed restoration project. The study consists in the implementation and validation of a laterally averaged delta growth model to quantify the impact of the proposed restoration project on the Nile Delta in terms of changes in shoreline position and channel-floodplain characteristics under the predicted rates of sea level rise.

  7. Inflow forecasting model construction with stochastic time series for coordinated dam operation

    NASA Astrophysics Data System (ADS)

    Kim, T.; Jung, Y.; Kim, H.; Heo, J. H.

    2014-12-01

    Dam inflow forecasting is one of the most important tasks in dam operation for an effective water resources management and control. In general, dam inflow forecasting with stochastic time series model is possible to apply when the data is stationary because most of stochastic process based on stationarity. However, recent hydrological data cannot be satisfied the stationarity anymore because of climate change. Therefore a stochastic time series model, which can consider seasonality and trend in the data series, named SARIMAX(Seasonal Autoregressive Integrated Average with eXternal variable) model were constructed in this study. This SARIMAX model could increase the performance of stochastic time series model by considering the nonstationarity components and external variable such as precipitation. For application, the models were constructed for four coordinated dams on Han river in South Korea with monthly time series data. As a result, the models of each dam have similar performance and it would be possible to use the model for coordinated dam operation.Acknowledgement This research was supported by a grant 'Establishing Active Disaster Management System of Flood Control Structures by using 3D BIM Technique' [NEMA-NH-12-57] from the Natural Hazard Mitigation Research Group, National Emergency Management Agency of Korea.

  8. 8. VIEW NORTH DURING CONSTRUCTION, DECEMBER 1995, FACE OF ORIGINAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW NORTH DURING CONSTRUCTION, DECEMBER 1995, FACE OF ORIGINAL 1882 MASONRY DAM WITH CAPSTONES - Norwich Water Power Company, Dam, West bank of Shetucket River opposite Fourteenth Street, Greenville section, Norwich, New London County, CT

  9. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlifemore » species incurring positive impacts attributable to the project were identified.« less

  10. Environmental Analysis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Burns & McDonnell Engineering's environmental control study is assisted by NASA's Computer Software Management and Information Center's programs in environmental analyses. Company is engaged primarily in design of such facilities as electrical utilities, industrial plants, wastewater treatment systems, dams and reservoirs and aviation installations. Company also conducts environmental engineering analyses and advises clients as to the environmental considerations of a particular construction project. Company makes use of many COSMIC computer programs which have allowed substantial savings.

  11. Laboratory experiments on dam-break flow of water-sediment mixtures

    USDA-ARS?s Scientific Manuscript database

    Dams induce sedimentation and store significant amounts of sediment as they age; therefore, dam failures often involve the release of sediment-laden water to the downstream floodplain. In particular, tailings dams, which are constructed to impound mining wastes, can cause devastating damage when the...

  12. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the dam and the methods of monitoring techniques applied by various disciplines. Some results have been obtained from this method for nearly eight years are presented in this work. In addition, the results of bathymetric surveys between 2005 and 2010 will be compared using the cross sections where the maximum changes occurred on the dam bottom of the reservoir area.

  13. 176. Photographic copy of original construction drawing dated February 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    176. Photographic copy of original construction drawing dated February 10, 1933 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; LOCATION OF THERMOMETER GROUPS. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  14. 174. Photographic copy of original construction drawing dated March 27, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    174. Photographic copy of original construction drawing dated March 27, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; UPLIFT PRESSURE PIPES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. Stress and deformation analysis of double curvature arc dams using finite element method (FEM): A case of budhi gandaki hydropower project

    NASA Astrophysics Data System (ADS)

    Mishra, Aanand Kumar; Singh, Ajay; Bahadur Singh, Akal

    2018-06-01

    High rise arc dams are widely used in the development of storage type hydropower project because of the economic advantage. Among different phases considered during the lifetime of dam, control of dam’s safety and performance becomes more concerned during the lifetime. This paper proposed the 3 – D finite element method (FEM) for stress and deformation analysis of double curvature arc dam considering the non – linearity of foundation rock following the Hoek – Brown Criterion. The proposed methodology is implemented through MATLAB scripting language and studied the double curvature arc dam proposed for Budhi Gandaki hydropower project. The stress developed in the foundation rock, compressive and tensile stress acting on the dam are investigated and analysed for the reservoir level variation. Deformation at the top of the dam and in the foundation rock is also investigated. In addition to that, stress and deformation variation in the foundation rock is analysed for various rock properties.

  16. 18 CFR 4.50 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...

  17. 18 CFR 4.50 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...

  18. 18 CFR 4.50 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...

  19. 18 CFR 4.50 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...

  20. 18 CFR 4.50 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Application for License for Major Project-Existing Dam § 4.50 Applicability. (a... to any application for either an initial license or new license for a major project—existing dam that... apply to any major project—existing dam (see § 4.40) that is proposed to entail or include: (i) Any...

  1. National Program for Inspection of Non-Federal Dams. Baker Floodwater Reservoir Site 11 (NH 00478), NHWRB No. 249.13, Merrimack River Basin, Wentworth, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen

  2. A Study of the Impact of Dams on Streamflow and Sediment Retention in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Munroe, T.; Anderson, E.; Markert, K. N.; Griffin, R.

    2017-12-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. Current studies that assess the hydrological impact of dams in the region focus on only one or a small subset (<10) of dams. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), a rainfall-runoff hydrologic model to determine change in streamflow and sedimentation in the Mekong Basin before and after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  3. Earthern embankment overtopping analysis using the WinDAM B software

    USDA-ARS?s Scientific Manuscript database

    Over 11,000 small watershed dams have been constructed with USDA involvement over an eighty year period. WinDAM B software has been developed to help engineers address dam safety concerns relative to potential overtopping of these earthen embankments. The primary function of the software is threef...

  4. Hydrological threats to riparian wetlands of international importance - a global quantitative and qualitative analysis

    NASA Astrophysics Data System (ADS)

    Schneider, Christof; Flörke, Martina; De Stefano, Lucia; Petersen-Perlman, Jacob D.

    2017-06-01

    Riparian wetlands have been disappearing at an accelerating rate. Their ecological integrity as well as their vital ecosystem services for humankind depend on regular patterns of inundation and drying provided by natural flow regimes. However, river hydrology has been altered worldwide. Dams cause less variable flow regimes and water abstractions decrease the amount of flow so that ecologically important flood pulses are often reduced. Given growing population pressure and projected climate change, immediate action is required. However, the implementation of counteractive measures is often a complex task. This study develops a screening tool for assessing hydrological threats to riparian wetlands on global scales. The approach is exemplified on 93 Ramsar sites, many of which are located in transboundary basins. First, the WaterGAP3 hydrological modeling framework is used to quantitatively compare current and future modified flow regimes to reference flow conditions. In our simulations current water resource management seriously impairs riparian wetland inundation at 29 % of the analyzed sites. A further 8 % experience significantly reduced flood pulses. In the future, eastern Europe, western Asia, as well as central South America could be hotspots of further flow modifications due to climate change. Second, a qualitative analysis of the 93 sites determined potential impact on overbank flows resulting from planned or proposed dam construction projects. They take place in one-third of the upstream areas and are likely to impair especially wetlands located in South America, Asia, and the Balkan Peninsula. Third, based on the existing legal/institutional framework and water resource availability upstream, further qualitative analysis evaluated the capacity to preserve overbank flows given future streamflow changes due to dam construction and climate change. Results indicate hotspots of vulnerability exist, especially in northern Africa and the Persian Gulf.

  5. Dam construction impacts on multiscale characterization of sediment discharge in two typical karst watersheds of southwest China

    NASA Astrophysics Data System (ADS)

    Li, Zhenwei; Xu, Xianli; Xu, Chaohao; Liu, Meixian; Wang, Kelin

    2018-03-01

    Southwest China, as one of the largest continuous karst areas in the world, is a severely eroded region due to its special geological condition. Thus, soil and water conservation measures such as dam construction have been extensively implemented in this region to control sediment delivery. However, it remains unclear how dam construction affects multiscale variability of sediment discharge (SD) and its potentially influential factors in southwest China. To assess this, annual SD, water discharge (WD), precipitation (PT), potential evapotranspiration (PET), and normalized differential vegetation index (NDVI) data from 1955 to 2015 were obtained from two karst watersheds of Liujiang (no large dams) and Hongshui (dam-controlled). These sites shared the similar climatic conditions. The Mann-Kendal test, Wilcoxon rank-sum test, and continuous wavelet transform analysis was used to detect the trends and periodicity in SD, and wavelet coherence analysis were employed to detect the temporal covariance between SD and WD, PT, PET, and NDVI. Results indicated that the multiscale variability of SD was strongly influenced by dam construction. The annual SD showed significant 4-year periodic oscillation in the Liujiang watershed, while no significant cycles were found in the Hongshui watershed. Dam construction exerted substantial influence on the multiscale correlations between SD and its associated factors. The time scales that the NDVI resonated with SD were concentrated on the periodicity of 2- and 3-year in the Liujiang watershed. In contrast, no significant periodicities were observed in the Hongshu watershed. This study yields a greater understanding of SD dynamics, and is helpful for better watershed management in karst areas of southwest China.

  6. Montgomery Point Lock and Dam, White River, Arkansas

    DTIC Science & Technology

    2016-01-01

    ER D C/ CH L TR -1 6- 1 Monitoring Completed Navigation Projects (MCNP) Program Montgomery Point Lock and Dam, White River, Arkansas Co...Navigation Projects (MCNP) Program ERDC/CHL TR-16-1 January 2016 Montgomery Point Lock and Dam, White River, Arkansas Allen Hammack, Michael Winkler, and...20314-1000 Under MCNP Work Unit: Montgomery Point Lock and Dam, White River, Arkansas ERDC/CHL TR-16-1 ii Abstract Montgomery Point Lock and

  7. An index-based framework for assessing patterns and trends in river fragmentation and flow regulation by global dams at multiple scales

    NASA Astrophysics Data System (ADS)

    Grill, Günther; Lehner, Bernhard; Lumsdon, Alexander E.; MacDonald, Graham K.; Zarfl, Christiane; Reidy Liermann, Catherine

    2015-01-01

    The global number of dam constructions has increased dramatically over the past six decades and is forecast to continue to rise, particularly in less industrialized regions. Identifying development pathways that can deliver the benefits of new infrastructure while also maintaining healthy and productive river systems is a great challenge that requires understanding the multifaceted impacts of dams at a range of scales. New approaches and advanced methodologies are needed to improve predictions of how future dam construction will affect biodiversity, ecosystem functioning, and fluvial geomorphology worldwide, helping to frame a global strategy to achieve sustainable dam development. Here, we respond to this need by applying a graph-based river routing model to simultaneously assess flow regulation and fragmentation by dams at multiple scales using data at high spatial resolution. We calculated the cumulative impact of a set of 6374 large existing dams and 3377 planned or proposed dams on river connectivity and river flow at basin and subbasin scales by fusing two novel indicators to create a holistic dam impact matrix for the period 1930-2030. Static network descriptors such as basin area or channel length are of limited use in hierarchically nested and dynamic river systems, so we developed the river fragmentation index and the river regulation index, which are based on river volume. These indicators are less sensitive to the effects of network configuration, offering increased comparability among studies with disparate hydrographies as well as across scales. Our results indicate that, on a global basis, 48% of river volume is moderately to severely impacted by either flow regulation, fragmentation, or both. Assuming completion of all dams planned and under construction in our future scenario, this number would nearly double to 93%, largely due to major dam construction in the Amazon Basin. We provide evidence for the importance of considering small to medium sized dams and for the need to include waterfalls to establish a baseline of natural fragmentation. Our versatile framework can serve as a component of river fragmentation and connectivity assessments; as a standardized, easily replicable monitoring framework at global and basin scales; and as part of regional dam planning and management strategies.

  8. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall

    NASA Astrophysics Data System (ADS)

    Wang, Wei; Lu, Hui; Ruby Leung, L.; Li, Hong-Yi; Zhao, Jianshi; Tian, Fuqiang; Yang, Kun; Sothea, Khem

    2017-10-01

    Water resources management, in particular flood control, in the Lancang-Mekong River Basin (LMRB) faces two key challenges in the 21st century: climate change and dam construction. A large-scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-LMK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the LMRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, stream regulation by dam reduces flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

  9. The effect of dam construction on the movement of dwarf caimans, Paleosuchus trigonatus and Paleosuchus palpebrosus, in Brazilian Amazonia.

    PubMed

    Campos, Zilca; Mourão, Guilherme; Magnusson, William E

    2017-01-01

    Run-of-the-river hydroelectric dams cause changes in seasonal inundation of the floodplains, and this may cause displacement of semi-aquatic vertebrates present before dam construction. This study evaluated the movement of crocodilians before and after the filling of the Santo Antônio hydroelectric reservoir on the Madeira River in the Brazilian Amazon, which occurred in November 2011. We radio-tracked four adult male Paleosuchus palpebrosus and four adult male Paleosuchus trigonatus before and after the formation of the reservoir between 2011 and 2013. The home ranges of the P. palpebrosus varied from < 1 km2 to 91 km2 and the home ranges of the P. trigonatus varied from < 1km2 to 5 km2. The species responded differently to time since filling and water level in weekly movement and home range. However, overall the dam appears to have had little effect on the use of space by the individuals that were present before dam construction.

  10. 72. Headgates for Agua Fria project canal on east end ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. Headgates for Agua Fria project canal on east end of diversion dam. Photographer Mark Durben. Source: Salt River Project. - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  11. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  12. 75 FR 61458 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-386] Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and... August 16, 2010. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Hydroelectric...

  13. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  14. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  15. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the... Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for...

  16. GC51D-0831: A Study of the Impact of Dams on Sediment Retention in the Mekong River Basin

    NASA Technical Reports Server (NTRS)

    Munroe, Thailynn; Griffin, Robert; Anderson, Eric; Markert, Kel

    2017-01-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), developed at Texas A & M, a rainfall-runoff hydrologic model to determine change in sedimentation in the Mekong Basin after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu & Varis (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  17. 6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING SURROUNDING DEVELOPMENT FROM CONSTRUCTION OF DAM - Columbia River Bridge at Grand Coulee Dam, Spanning Columbia River at State Route 155, Coulee Dam, Okanogan County, WA

  18. Exploring the hydropower potential of future ice-free glacier basins

    NASA Astrophysics Data System (ADS)

    Round, Vanessa; Farinotti, Daniel; Huss, Matthias

    2017-04-01

    The retreat of glaciers over the next century will present new challenges related to water availability and cause significant changes to the landscape. The construction of dams in areas becoming ice-free has previously been suggested as a mitigation measure against changes to water resources in the European Alps. In Switzerland, a number of hydropower dams already exist directly below glaciers, and the hydropower potential of natural lakes left by retreating glaciers has been recognised. We expand these concepts to the regional, and ultimately global, scale to assess the potential of creating hydropower dams in glacier basins, encouraged by advantages such as relatively low ecological and social impacts, and the possibility to replicate the water storage capabilities of glaciers. In a first order assessment, dam volumes are computed using a subglacial topography model and dam walls simulated at the terminus of each glacier. Potential power production is then estimated from projected glacier catchment runoff until 2100 based on the Global Glacier Evolution Model (GloGEM), and penstock head approximated from a global digital elevation model. Based on this, a feasibility ranking system is presented which takes into account various proxies for cost, demand and impact, such as proximity to populations and existing infrastructure, geological risks and threatened species. The ultimate objective is to identify locations of glacier retreat which could most feasibly and beneficially be used for hydropower production.

  19. The Challenge of Access: Using Road Construction as a Tool in Counterinsurgency

    DTIC Science & Technology

    2011-06-10

    northward, as shown in figure 9. Built by the United States in the 1950s, the dam and its downstream channels provide water for irrigation across the...12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT This...consolidated Russian control. It also brought Russia closer to an overriding strategic objective, the procurement of a warm water port from which to project

  20. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  1. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  2. 154. Photographic copy of original construction drawing dated April 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    154. Photographic copy of original construction drawing dated April 10, 1928 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; 60 X 12 SPILLWAY RING GATE CONTROL LAYOUT AND ASSEMBLY. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  3. 155. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    155. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYEE DAM SPILLWAY; 60 X 12 RING GATE-CONTROL; INSTALLATION ASSEMBLIES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  4. 167. Photographic copy of original construction drawing dated October 10, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    167. Photographic copy of original construction drawing dated October 10, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM-IRRIGATION OUTLET; 48 NEEDLE VALVES; PRESSURE PIPING AND MATERIAL LIST. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  5. Dam Dynamics in the Colonial Northeast and Chesapeake: Hydrologic Implications

    NASA Astrophysics Data System (ADS)

    Bain, D. J.; Salant, N. L.; Brandt, S. L.

    2008-12-01

    Recent work has highlighted the widespread presence of low-head dams for power generation during the 19th century. However, this work largely depends on census numbers tabulated in the mid-1800s, over 200 years after European activity began in North America. In order to compare the hydrologic implications of colonial era low-head dam construction with the impacts of other simultaneous processes (e.g., expatriation of the beaver or forest clearance), we have compiled historical data on mills to reconstruct the temporal and spatial dynamics of low-head dam construction in the colonial northeastern United States (i.e., Virginia to Maine). This reconstruction, combined with the results of related work on beaver pond dynamics and deforestation, provides several insights into the distribution and impacts of human impoundments during this period. While the resulting hydrologic changes are large, the addition of human dams to the system seems to be minimally offset and less important than changes arising from the expatriation of the beaver or the removal of trees during this early period. In addition, the spatial patterns of dam construction are complex, making prediction of hydrologic and associated responses more difficult to predict.

  6. 7. Detail view of reinforced concrete archrings comprising dam's upstream ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Detail view of reinforced concrete arch-rings comprising dam's upstream face. Impressions of the wooden formwork used in construction are visible in the concrete. - Little Rock Creek Dam, Little Rock Creek, Littlerock, Los Angeles County, CA

  7. 78 FR 62322 - Hydropower Regulatory Efficiency Act of 2013; Notice of Rescheduled Two-Year Licensing Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the... process for licensing hydropower development at non-powered dams and closed-loop pumped storage projects...-powered dam versus closed- loop pumped storage) affect the steps included in a two-year process? 3.9...

  8. 77 FR 34033 - American River Power IX, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... generator; (3) a concrete tailrace releasing water into the river downstream of the dam; (4) a switchyard... study the feasibility of the Peoria Dam, Illinois--Hydroelectric Water Power Project (Peoria Dam Project...-long, 50-foot-wide, 55-foot-high powerhouse containing two horizontal Kaplan pit turbines each with a...

  9. River turbidity and sediment loads during dam removal

    USGS Publications Warehouse

    Warrick, Jonathan A.; Duda, Jeffrey J.; Magirl, Christopher S.; Curran, Chris A.

    2012-01-01

    Dam decommissioning has become an important means for removing unsafe or obsolete dams and for restoring natural fluvial processes, including discharge regimes, sediment transport, and ecosystem connectivity [Doyle et al., 2003]. The largest dam-removal project in history began in September 2011 on the Elwha River of Washington State (Figure 1a). The project, which aims to restore the river ecosystem and increase imperiled salmon populations that once thrived there, provides a unique opportunity to better understand the implications of large-scale river restoration.

  10. American River Watershed Project, California. Part 1: Main Report. Part 2: Final Supplemental Environmental Impact Statement/Environmental Impact Report. Supplemental Information Report

    DTIC Science & Technology

    1996-03-01

    VII-7 VIII-1 Computer generated rendering of flood detention dam ................ VIII-3 VIII-2 American River Watershed Project Schedule...shows a plan view of the dam and plate 19 shows the dam in section and profile. Figure VIII-1 is a computer generated rendering of the dam. Table VIH-1...Williamson Act render the land ineligible for continued protection under that law, the local sponsor would be responsible for compensating the landowners

  11. 19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  12. 156. Photographic copy of original construction drawing dated October 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    156. Photographic copy of original construction drawing dated October 24, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM SPILLWAY; 60 X 12 RING GATE-CONTROL; SCALE FRAME AND SCALES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  13. 15. DETAIL VIEW OF SAWMILL POWER HOUSE FOUNDATION (CONSTRUCTED IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. DETAIL VIEW OF SAWMILL POWER HOUSE FOUNDATION (CONSTRUCTED IN 1909) SHOWING THE WIRE-ROPE AND RAILROAD RAILS USED AS REINFORCEMENT IN THE CONCRETE. THIS SAME MODE OF REINFORCEMENT WAS USED IN THE DAM. - Hume Lake Dam, Sequioa National Forest, Hume, Fresno County, CA

  14. 166. Photographic copy of original construction drawing dated September 5, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    166. Photographic copy of original construction drawing dated September 5, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM-IRRIGATION OUTLET; DRAIN VENT AND PRESSURE PIPING INSTALLATION; 48 NEEDLE VALVES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  15. Global water resources affected by human interventions and climate change.

    PubMed

    Haddeland, Ingjerd; Heinke, Jens; Biemans, Hester; Eisner, Stephanie; Flörke, Martina; Hanasaki, Naota; Konzmann, Markus; Ludwig, Fulco; Masaki, Yoshimitsu; Schewe, Jacob; Stacke, Tobias; Tessler, Zachary D; Wada, Yoshihide; Wisser, Dominik

    2014-03-04

    Humans directly change the dynamics of the water cycle through dams constructed for water storage, and through water withdrawals for industrial, agricultural, or domestic purposes. Climate change is expected to additionally affect water supply and demand. Here, analyses of climate change and direct human impacts on the terrestrial water cycle are presented and compared using a multimodel approach. Seven global hydrological models have been forced with multiple climate projections, and with and without taking into account impacts of human interventions such as dams and water withdrawals on the hydrological cycle. Model results are analyzed for different levels of global warming, allowing for analyses in line with temperature targets for climate change mitigation. The results indicate that direct human impacts on the water cycle in some regions, e.g., parts of Asia and in the western United States, are of the same order of magnitude, or even exceed impacts to be expected for moderate levels of global warming (+2 K). Despite some spread in model projections, irrigation water consumption is generally projected to increase with higher global mean temperatures. Irrigation water scarcity is particularly large in parts of southern and eastern Asia, and is expected to become even larger in the future.

  16. Global water resources affected by human interventions and climate change

    PubMed Central

    Haddeland, Ingjerd; Heinke, Jens; Biemans, Hester; Eisner, Stephanie; Flörke, Martina; Hanasaki, Naota; Konzmann, Markus; Ludwig, Fulco; Masaki, Yoshimitsu; Schewe, Jacob; Stacke, Tobias; Tessler, Zachary D.; Wada, Yoshihide; Wisser, Dominik

    2014-01-01

    Humans directly change the dynamics of the water cycle through dams constructed for water storage, and through water withdrawals for industrial, agricultural, or domestic purposes. Climate change is expected to additionally affect water supply and demand. Here, analyses of climate change and direct human impacts on the terrestrial water cycle are presented and compared using a multimodel approach. Seven global hydrological models have been forced with multiple climate projections, and with and without taking into account impacts of human interventions such as dams and water withdrawals on the hydrological cycle. Model results are analyzed for different levels of global warming, allowing for analyses in line with temperature targets for climate change mitigation. The results indicate that direct human impacts on the water cycle in some regions, e.g., parts of Asia and in the western United States, are of the same order of magnitude, or even exceed impacts to be expected for moderate levels of global warming (+2 K). Despite some spread in model projections, irrigation water consumption is generally projected to increase with higher global mean temperatures. Irrigation water scarcity is particularly large in parts of southern and eastern Asia, and is expected to become even larger in the future. PMID:24344275

  17. A report upon the Grand Coulee Fish Maintenance Project 1939-1947

    USGS Publications Warehouse

    Fish, F.F.; Hanavan, Mitchell G.

    1948-01-01

    The construction or Grand Coulee Dam, on the upper Columbia River, involved the loss of 1,140 lineal miles of spawning and rearing stream to the production of anadromous fishes. The fact that the annual value of these fish runs to the nation was estimated at $250,000 justified reasonable expenditures to assure their perpetuation. It was found economically infeasible to safely collect and pass adult fish upstream and fingerling fish downstream at the dam because of the tremendous flow of the river and the 320 foot vertical difference in elevation between forebay and tailrace.The Grand Coulee Fish-Maintenance Project, undertaken by the United States Fish and Wildlife Service in 1939, consisted in relocating the anadroumous runs of the upper Columbia River to four major tributaries entering below the Grand Coulee damsite. These streams were believed capable of supporting several times their existing, badly depleted, run. The plan was predicated upon the assumption that the relocated runs, in conformity with their "homing tendency", would return to the lower tributaries rather than attempt to reach their ancestral spawning grounds above Grand Coulee Dam. This interim report covers the history and accomplishments of the Grand Coulee Fish-Maintenance Project through the initial period of relocating the rune as well as the first four years of the permanent program. Results obtained to date indicate conclusive success in diverting the upper Columbia fish runs into the accessible lower tributaries. The results also indicate, less conclusively, that - in spite of many existing handicaps - the upper Columbia salmon and steelhead runs may be rehabilitated through the integrated program of natural and artificial propagation incorporated in the Grand Coulee Fish-Maintenance Project.

  18. Sedimentation rates in the marshes of Sand Lake National Wildlife Refuge

    USGS Publications Warehouse

    Gleason, R.A.; Euliss, N.H.; Holmes, C.W.

    2003-01-01

    Impoundments located within river systems in the Northern Great Plains are vulnerable to sediment inputs because intensive agriculture in watersheds has increased soil erosion and sediments in rivers. At the request of the U.S. Fish and Wildlife Service (FWS), we evaluated the vertical accretion of sediment in the Mud Lake impoundment of Sand Lake National Wildlife Refuge (NWR), Brown County, South Dakota. The Mud Lake impoundment was created in 1936 by constructing a low-head dam across the James River. We collected sediment cores from the Mud Lake impoundment during August 2000 for determination of vertical accretion rates. Accretion rates were estimated using cesium-13 7 and lead-210 isotopic dating techniques to estimate sediment accretion over the past 100 years. Accretion rates were greatest near the dam (1.3 cm yr-1) with less accretion (0.2 cm yr-1) occurring in the upper reaches of Mud Lake. As expected, accretion was highest near the dam where water velocities and greater water depth facilitates sediment deposition. Higher rates of sedimentation (accretion> 2.0 cm year-1) occurred during the 1990s when river flows were especially high. Since 1959, sediment accretion has reduced maximum pool depth of Mud Lake near the dam by 55 cm. Assuming that sediment accretion rates remain the same in the future, we project Mud Lake will have a maximum pool depth of 77 and 51 cm by 2020 and 2040, respectively. Over this same time frame, water depths in the upper reaches of Mud Lake would be reduced to< 2 cm. Projected future loss of water depth will severely limit the ability of managers to manipulate pool levels in Mud Lake to cycle vegetation and create interspersion of cover and water to meet current wildlife habitat management objectives. As predicted for major dams constructed on rivers throughout the world, Mud Lake will have a finite life span. Our data suggests that the functional life span of Mud Lake since construction will be < 100 years. We anticipate that over the next 20 years, sediments entering Mud Lake will reduce water depths to the point that current wildlife management objectives cannot be achieved through customary water-level manipulations. Sedimentation impacts are not unique to the Sand Lake NWR. It is widely accepted that impoundments trap sediments and shallow impoundments, such as those managed by the FWS, are especially vulnerable. Given the ecological impacts associated with loss of water depths, we recommend that managers begin evaluating the long-term wildlife management goals for the refuge relative to associated costs and feasibility of options available to enhance and maximize the life span of existing impoundments, including upper watershed management.

  19. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, Steve; McCarty, Patrick

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage sincemore » the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.« less

  20. Monitoring the ongoing deformation and seasonal behaviour affecting Mosul Dam through space-borne SAR data

    NASA Astrophysics Data System (ADS)

    Tessari, G.; Riccardi, P.; Pasquali, P.

    2017-12-01

    Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation fields obtained from SAR data are evaluated to assess the temporal evolution of the strains affecting the structure. Obtained results represent the preliminary stage of a multidisciplinary project, finalized to assess possible damages affecting a dam through remote sensing and civil engineering surveys.

  1. Geo-environmental Study to Identify the Affecting Factors on Dohuk's Dam and the city (Northren Iraq) by Use Remote Sensing Techniques

    NASA Astrophysics Data System (ADS)

    Hamdon, Alaa

    2010-05-01

    The Dohuk's dam is one of the most important Aggregated dams in Iraq, located about 1 km from Dohuk city in northern Iraq, So; this vital project provides Dohuk city by water while the city formerly dependent on wells water prior to the establishing of the dam, and this is one of the main reasons for land-use expansion in Dohuk city and its vicinity,which is meant that the Dohuk's dam safety factor ,it is the key of the city safety factor .This dam has initiated the establishment of the dam in 1980 and was established in 1988, and it's capacity is 47.5 million cubic meters. This study aims to analyze the morphometric or geometric properties and the environmental factors at drainage systems and drainage network for Dohuk area's drainage basins (which recharges water of Dohuk Dam's Lake and it is accumulated by rainfall and spring water) scientifically and geometrically. Study of the geology of construction area of the dam Structuraly and tectonically. Satellite image, topographic maps and aerial photographs used in this study for merging its results together and preparing a drainage basin's maps and a geologic interpretation map for the study area to recognize the important geologic impact on the river which comes out from dam lake, also some of the field work investigation has been depended in this study. As a final result from morphometric analysis of drainage basins, tectonic analysis and geological investigations for study area, found as the following: 1 - Determining the amount of the accumulated sediments on the dam body, which has been carried by the collected rain-full water from the drainage basins, snow and spring water (the resources of Dam Lake). Study of the impact of these deposits on dam stability and evaluate the risk of these deposits on dam body and on its safety. 2 - Identification of geological features, which are that threaten the safety of the river of city which concern the only resource for the city and stability of dam body and its related to other geological phenomena (such as earthquakes and floods ... etc.). 3 - Suggestions some of the proposals for the maintenance of the dam lake to preserve the stability of the dam body and to protect the river properties. 4- Prepare some scientific criteria to avoid a disaster affecting human activity or agricultural or industrial, which are located in the city of Dohuk.

  2. Master Plan for Public Use Development and Resource Management, Lake Traverse, Minnesota - South Dakota.

    DTIC Science & Technology

    1979-05-01

    White Rock Dam Recreation Area 25 Reservation Highway Recreation Area 27 Brown’s Valley Dike Recreation Area 28 Potential Recreation Areas 28 Section...Development 35 White Rock Dam 35 Reservation Highway 39 Brown’s Valley Dike 39 Land Use Allocation 42 Project Operations ൲ Operations: Recreation--Intensive...Facilities 4 Proposed Facilities v i i u < *1 I_ • In I . .. PROJECT DAT ~PROJECT DATA LAKE TRAVERSE AND RESERVATION DAM Reservoir Flowage rights to

  3. Authorized and Operating Purposes of Corps of Engineers Reservoirs

    DTIC Science & Technology

    1992-07-01

    Puerto Rico CERRILLOS DAM AND RESERVOIR Jacksonville E-9O PORTUGUES DAM AND RESERVOIR Jacksonville E-92 South Carolina HARTWELL DAM AND LAKE Savannah E...LAKE Missouri Kansas City E-12 POMONA LAKE Kansas Kansas City E-12 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 PRADO DAM (SANTA ANA...PROJECT Florida Jacksonville E-92 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 RODMAN LOCK AND DAM (CROSS FLORIDA BARGE CANAL Florida

  4. 51. Photographic copy of construction drawing, U.S. Reclamation Service, August ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of construction drawing, U.S. Reclamation Service, August 1906 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Crib dam at Lake Keechelus." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  5. 78 FR 27215 - Baker County Oregon; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... the base of Mason dam in the vicinity of the exiting discharge via the project's tailrace. Baker... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12686-004] Baker County...: Baker County, Oregon (Baker County). e. Name of Project: Mason Dam Hydroelectric Project. f. Location...

  6. The invisibility of fisheries in the process of hydropower development across the Amazon.

    PubMed

    Doria, Carolina Rodrigues da Costa; Athayde, Simone; Marques, Elineide E; Lima, Maria Alice Leite; Dutka-Gianelli, Jynessa; Ruffino, Mauro Luis; Kaplan, David; Freitas, Carlos E C; Isaac, Victoria N

    2018-05-01

    We analyze the invisibility of fisheries and inadequacy of fishers' participation in the process of hydropower development in the Amazon, focusing on gaps between legally mandated and actual outcomes. Using Ostrom's institutional design principles for assessing common-pool resource management, we selected five case studies from Brazilian Amazonian watersheds to conduct an exploratory comparative case-study analysis. We identify similar problems across basins, including deficiencies in the dam licensing process; critical data gaps; inadequate stakeholder participation; violation of human rights; neglect of fishers' knowledge; lack of organization and representation by fishers' groups; and lack of governmental structure and capacity to manage dam construction activities or support fishers after dam construction. Fishers have generally been marginalized or excluded from decision-making regarding planning, construction, mitigation, compensation, and monitoring of the social-ecological impacts of hydroelectric dams. Addressing these deficiencies will require concerted investments and efforts by dam developers, government agencies and civil society, and the promotion of inter-sectorial dialogue and cross-scale participatory planning and decision-making that includes fishers and their associations.

  7. Simulation analysis of temperature control on RCC arch dam of hydropower station

    NASA Astrophysics Data System (ADS)

    XIA, Shi-fa

    2017-12-01

    The temperature analysis of roller compacted concrete (RCC) dam plays an important role in their design and construction. Based on three-dimensional finite element method, in the computation of temperature field, many cases are included, such as air temperature, elevated temperature by cement hydration heat, concrete temperature during placing, the influence of water in the reservoir, and boundary temperature. According to the corresponding parameters of RCC arch dam, the analysis of temperature field and stress field during the period of construction and operation is performed. The study demonstrates that detailed thermal stress analysis should be performed for RCC dams to provide a basis to minimize and control the occurrence of thermal cracking.

  8. Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam

    NASA Astrophysics Data System (ADS)

    Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.

    2016-12-01

    The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.

  9. Understanding Hydrological Regime Alterations Caused by dams: the Santiago River case in the Andean Region of the Amazon Basin.

    NASA Astrophysics Data System (ADS)

    Rosero-Lopez, D.; Flecker, A.; Walter, M. T.

    2016-12-01

    Water resources in South America have been clearly targeted as key sources for hydropower expansion over the next 30 years. Ecuador, among the most biologically diverse countries in the world, has the highest density of hydropower dams, either operational, under construction, or planned, in the Amazon Basin. Ecuador's ambitious plan to change its energy portfolio is conceived to satisfy the country's demand and to empower the country to be the region's first hydroelectric energy exporter. The Santiago watershed located in the southeast part of the country has 39 facilities either under construction or in operation. The Santiago River and its main tributaries (Zamora and Upano) are expected to be impounded by large dams over the next 10 years. In order to understand the magnitude and potential impacts of regional dam development on hydrological regimes, a 35-year historical data set of stream discharge was analyzed. We examined flow regimes for time series between the construction of each dam, starting with the oldest and largest built in 1982 up until the most recent dam built in 2005. Preliminary results indicate a systematic displacement in flow seasonality following post-dam compared to pre-dam conditions. There are also notable differences in the distributions of peaks and pulses in post-dam flows. The range of changes from these results shows that punctuated and cumulative impacts are related to the size of each new impoundment. These observations and their implications to the livelihoods, biota, and ecosystems services in the Santiago watershed need to be incorporated into a broader cost-benefit analysis of hydropower generation in the western Amazon Basin.

  10. Impacts of large dams on the complexity of suspended sediment dynamics in the Yangtze River

    NASA Astrophysics Data System (ADS)

    Wang, Yuankun; Rhoads, Bruce L.; Wang, Dong; Wu, Jichun; Zhang, Xiao

    2018-03-01

    The Yangtze River is one of the largest and most important rivers in the world. Over the past several decades, the natural sediment regime of the Yangtze River has been altered by the construction of dams. This paper uses multi-scale entropy analysis to ascertain the impacts of large dams on the complexity of high-frequency suspended sediment dynamics in the Yangtze River system, especially after impoundment of the Three Gorges Dam (TGD). In this study, the complexity of sediment dynamics is quantified by framing it within the context of entropy analysis of time series. Data on daily sediment loads for four stations located in the mainstem are analyzed for the past 60 years. The results indicate that dam construction has reduced the complexity of short-term (1-30 days) variation in sediment dynamics near the structures, but that complexity has actually increased farther downstream. This spatial pattern seems to reflect a filtering effect of the dams on the on the temporal pattern of sediment loads as well as decreased longitudinal connectivity of sediment transfer through the river system, resulting in downstream enhancement of the influence of local sediment inputs by tributaries on sediment dynamics. The TGD has had a substantial impact on the complexity of sediment series in the mainstem of the Yangtze River, especially after it became fully operational. This enhanced impact is attributed to the high trapping efficiency of this dam and its associated large reservoir. The sediment dynamics "signal" becomes more spatially variable after dam construction. This study demonstrates the spatial influence of dams on the high-frequency temporal complexity of sediment regimes and provides valuable information that can be used to guide environmental conservation of the Yangtze River.

  11. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    PubMed

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  12. Temporal effects of post-fire check dam construction on soil functionality in SE Spain.

    PubMed

    González-Romero, J; Lucas-Borja, M E; Plaza-Álvarez, P A; Sagra, J; Moya, D; De Las Heras, J

    2018-06-09

    Wildfire has historically been an alteration factor in Mediterranean basins. Despite Mediterranean ecosystems' high resilience, wildfire accelerates erosion and degradation processes, and also affects soil functionality by affecting nutrient cycles and soil structure. In semi-arid Mediterranean basins, check dams are usually built in gullies and channels after fire as a measure against soil erosion. Although check dams have proven efficient action to reduce erosion rates, studies about how they affect soil functionality are lacking. Our approach focuses on how soil functionality, defined as a combination of physico-chemical and biological indicators, is locally affected by check dam construction and the evolution of this effect over time. Soils were sampled in eight check dams in two semi-arid areas at SE Spain, which were affected by wildfire in 2012 and 2016. The study findings reveal that by altering sediments cycle and transport, check dams influence soil's main physico-chemical and biochemical characteristics. Significant differences were found between check dam-affected zones and the control ones for many indicators such as organic matter content, electrical conductivity or enzymatic activity. According to the ANOVA results, interaction between check dams influence and time after fire, was a crucial factor. PCA results clearly showed check-dams influence on soil functionality. Copyright © 2018. Published by Elsevier B.V.

  13. Exporting dams: China's hydropower industry goes global.

    PubMed

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  14. 4. William Beardsley standing atop diversion dam. East cableway tower ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. William Beardsley standing atop diversion dam. East cableway tower and construction camp, Camp Dyer are visible in the foreground. Photographer James Dix Schuyler, 1903 Source: Schuyler report. - Waddell Dam, On Agua Fria River, 35 miles northwest of Phoenix, Phoenix, Maricopa County, AZ

  15. Effect of water on the triaxial response under monotonic loading of asphalt concrete used in dams

    NASA Astrophysics Data System (ADS)

    Gaxiola Hernández, Alberto; Ossa López, Alexandra

    2018-01-01

    Embankment dams with asphalt concrete cores have been constructed on practically all continents with satisfactory results. Nowadays many advantages, such as the mechanical strength, are known that makes asphalt concrete a competitive alternative for the construction of the impervious elements of dams. However, the current available information does not describe the effect of prolonged contact between asphalt concrete and water on the structure of an embankment dam. In this research cylindrical asphalt concrete specimens with a void content similar to that used in impervious barriers of dams were fabricated and submerged in water for a prolonged period to simulate the conditions experienced by asphalt concrete placed inside an embankment dam as its core material. Subsequently, triaxial compression tests were conducted on the specimens. The results indicated that the asphalt concrete exhibited a reduction in strength because of the saturation process to which the material was subjected. However, no changes were observed in the mechanical response to prolonged contact with water for periods of up to 12 months.

  16. Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen dams

    USGS Publications Warehouse

    Walder, Joseph S.; O'Connor, Jim E.

    1997-01-01

    Floods from failures of natural and constructed dams constitute a widespread hazard to people and property. Expeditious means of assessing flood hazards are necessary, particularly in the case of natural dams, which may form suddenly and unexpectedly. We revise statistical relations (derived from data for past constructed and natural dam failures) between peak discharge (Qp) and water volume released (V0) or drop in lake level (d) but assert that such relations, even when cast into a dimensionless form, are of limited utility because they fail to portray the effect of breach-formation rate. We then analyze a simple, physically based model of dam-breach formation to show that the hydrograph at the breach depends primarily on a dimensionless parameter η=kV0/gl/2d7/2, where k is the mean erosion rate of the breach and g is acceleration due to gravity. The functional relationship between Qp and η takes asymptotically distinct forms depending on whether η ≪ 1 (relatively slow breach formation or small lake volume) or η ≫ 1 (relatively fast breach formation or large lake volume). Theoretical predictions agree well with data from dam failures for which k, and thus η, can be estimated. The theory thus provides a rapid means of predicting the plausible range of values of peak discharge at the breach in an earthen dam as long as the impounded water volume and the water depth at the dam face can be estimated.

  17. The Three Gorges Dam of China: Technology to Bridge Two Centuries

    ERIC Educational Resources Information Center

    Wahby, Wafeek S.

    2003-01-01

    Some of the most sophisticated 20th-century technologies have been applied to build the largest hydroelectric dam in the world, the Three Gorges Dam Project (TGDP) of China. The author administered a study abroad course in China from May 27 to June 10, 2000, to study the massive project as it approached the halfway mark of its second and most…

  18. 77 FR 51993 - Western Technical College; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... hydroelectric generation at the dam. The dam is operated manually in a run-of-river mode (i.e., an operating...) distribution line; and (5) appurtenant facilities. The project would be operated in a run-of-river mode using... could otherwise enter project waters or adjacent non-project lands; Operating the project in a run-of...

  19. Project Planning for Cougar Dam during 2010

    USGS Publications Warehouse

    Haskell, Craig A.; Tiffan, Kenneth F.

    2011-01-01

    Cougar Dam is a 158 m-tall, rock fill dam located about 63 km east of Springfield, Oregon. Completed in 1963, the dam is owned and operated by the U.S. Army Corps of Engineers (USACE). It impounds Cougar Reservoir, which is 9.7 km long, has a surface area of 518 ha, and is predominately used for flood control. The pool elevation typically ranges from a maximum conservation pool of 515 m (1,690 ft) National Geodetic Vertical Datum (NGVD) in summer to a minimum flood control elevation of 467 m (1,532 ft NGVD) in winter. The reservoir thermally stratifies in the summer, has an average depth of 37 m, and holds 153,500 acre-feet when full. Cougar Dam is located on the South Fork of the McKenzie River 7 km upstream from the mainstem McKenzie River, a tributary of the Willamette River. The McKenzie River Basin basin supports the largest remaining population of wild spawning spring Chinook salmon in the Willamette River Basin (National Oceanic and Atmospheric Administration; NOAA, 2008). Cougar Dam and others were collectively deemed to cause jeopardy to the sustainability of anadromous fish stocks in the Willamette River Basin (NOAA, 2008). Prior to dam construction, as many as 805 redds were observed in the South Fork of the McKenzie River (Willis and others, 1960) and it is estimated that 40 km of spawning habitat were lost when access was blocked after dam construction. The 2008 Willamette Biological Opinion (BIOP) requires improvements to operations and structures to reduce impacts on Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR steelhead (O. mykiss; NOAA, 2008). In 2010, an adult fish collection facility was completed below Cougar Dam to collect returning adult salmon for transport to spawning habitats above the dam. Before that time, returning adult spring Chinook salmon were transported to upstream spawning areas as part of a trap-and-haul program with adults passed ranging annually from 0 to 1,038 (Taylor, 2000). The progeny of adult fish that are allowed to spawn above Cougar Dam move downstream into Cougar Reservoir in the spring. Under the BIOP, the USACE is required to provide downstream fish passage or operational alternatives at Cougar Dam by 2014. Currently, there is little information about the seasonal timing of reservoir entry of juvenile Chinook salmon and what habitats they and other fishes use in the reservoir. However, rotary screw traps placed in the outlet channel below the dam indicate peak juvenile passage coinciding with seasonally low pool elevation in mid December and late January. It is unknown whether juveniles upstream of Cougar Dam can be captured in large enough numbers for tagging and subsequent survival studies to proceed. These studies are needed to examine the feasibility of installing downstream fish passage structures at Cougar Dam to meet BIOP requirements. Therefore, the USACE contracted with the U.S. Geological Survey (USGS) to test the efficacy of using a mid-water trawl and lampara seine to capture fish in Cougar Reservoir on three consecutive days in the fall of 2010. These collection methods could potentially provide fish for feasibility and subsequent survival studies and as verification of fish targets in future active hydroacoustic surveys.

  20. 157. Photographic copy of original construction drawing dated July 29, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    157. Photographic copy of original construction drawing dated July 29, 1930 (from Record Group 115, Denver Branch of the National Archives, Denver). OWYHEE DAM; 60 X 12 SPILLWAY RING GATE; CONTROL AND PIPING INSTALLATION AND ANCHOR BOLT LOCATION (SHEET 2 OF 8). - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  1. Adapting to climate change or to stakeholders?

    NASA Astrophysics Data System (ADS)

    Bruggeman, Adriana; Camera, Corrado; Giannakis, Elias; Zoumides, Christos; Eliades, Marinos; Djuma, Hakan

    2015-04-01

    The Tamassos dam protects the Pedieos watershed in Cyprus against floods. The waterbody behind the dam serves as a new biodiversity and recreational resource. Water from the dam is also used for domestic water supply for nearby rural communities. However, this peaceful picture is threatened by climate change. Regional Climate Models indicate a drier and warmer Pedieos watershed in the near future (2020-2050). Interviews and meetings with a wide variety of stakeholders, for the development of a climate change adaptation plan for the Pedieos watershed, has created even more uncertainties than climate change. Environmental-minded stakeholders suggested to demolish the dam and to return the watershed to its natural state and the water to downstream ecosystems. Agricultural producers would also like to see the return of stream flows, such that they can divert or impound the water for groundwater recharge and subsequent irrigation. Community leaders similarly prefer stream flows for the recharge of the alluvial river aquifers, to allow them to abstract more groundwater for community water supply. Downstream authorities have different concerns. Here the usually dry river bed serves as the drainage of the urban agglomeration of the capital of Nicosia; and has been identified as an area of potentially significant flood risk for the European Flood Directive (2007/60/EC). The largest storm event in the upstream area in the recent past occurred in January 1989, before the construction of the dam. The runoff totalled 3.1 million m3 in one day and 4.4 million m3 in two days. Thus, part of the runoff would have flown straight through the spillway of the 2.8 million m3 dam reservoir. Average annual precipitation in the highly sloping, forested upstream area is 500 mm, while stream flows average 4.7 million m3/yr (1981-2001). This results in an average runoff coefficient of 19% for the 45-km2 upstream area. Past observations, climate change projections and hydrologic models facilitate the development of sustainable adaptation solutions. However, reconciling the diverging visions and water demands of the stakeholders will be a tougher problem to solve. This research is supported by the European Union's FP7 BEWATER project (GA 612385).

  2. Effects of flow alterations on trout, angling, and recreation in the Chattahoochee River between Buford Dam and Peachtree Creek

    USGS Publications Warehouse

    Nestler, John M.; Milhouse, Robert T.; Troxel, Jay; Fritschen, Janet A.

    1985-01-01

    In 1974 county governments in the Atlanta vicinity realized that demands on the Chattahoochee River for water supply plus the streamflow required for water quality nearly equaled the minimum flow in the river. Increased demands for water supply in the following years could not be supplied under the then existing flow regime in the river. In response to the anticipated shortage of water, the Atlanta Regional Commission, a multicounty agency responsible for comprehensive regional planning in the Atlanta region, was contracted to prepare water demand projections to the year 2010 and identify alternatives for meeting projected water demands. The results of this study are published in an extensive final report, the Metropolitan Atlanta Area Water Resources Management Study (1981). Requests for copies should be directed to the District Engineer, Savannah District. Many of the identified alternatives to increase future water supply for the Atlanta area would result in modifications to the present flow regime within the Chattahoochee River between Buford Dam (river mile 348.3) and its confluence with Peachtree Creek (river mile 300.5). The present preferred alternative is construction of a reregulation dam at about river mile 342. The proposed reregulation dam would release a much more constant flow than the peaking flows presently released from Buford Dam (generally, a maximum release of approximately 9000 cfs or minimum release of about 550 cfs) by storing the generation releases from Buford Dam for gradual release during non-generation periods. The anticipated minimum release from the rereg dam would he approximately 1U5U cfs (based on contractual obligations to the Southeast Power Administration to supply a minimum of 11 hours of peaking power per week from Buford Dam). The average annual release from the proposed reregulation dam into the Chattahoochee River would be approximately 2000 cfs (based on USGS flow records) and the median release would he approximately 1500 cfs (value obtained from Savannah District). The proposed reregulation dam would have sufficient storage to provide some opportunity for flow management to optimize uses other than water supply and water quality. Flow modifications (and resultant water quality changes) within this reach of the Chattahoochee River to meet increased demands for water supply may have an effect on other beneficial uses of this important natural resource. In addition to supplying a significant proportion of the water supply for metropolitan Atlanta and providing for water quality, the Chattahoochee River also is used extensively for recreation and supports a valuable trout fishery. Altered flows in the channel to meet water supply needs may have an impact on river recreation and trout habitat.

  3. National Program for Inspection of Non-Federal Dams. Keyser Dam (VT 00097), Connecticut River Basin, Chelsea, Vermont. Phase I Inspection Report.

    DTIC Science & Technology

    1980-04-01

    CARNEY M. TERZIAN, HENBER I Design Branch Engineering Division RICHARD DIB * Water Control Branch Engineering Division [ hPIPWVAL 220ininu: Chief...2 f. Operator 2 I g. Purpose of Dam 2 h. Design and Construction History 2 i. Normal Operational Procedure 2 1.3 Pertinent Data 2 a. Drainage...i. Spillway 5 J. Regulating Outlets 5 [I h] Section Page 2. ENGINEERING DATA 6 2.1 Design Data 6 2.2 Construction Data 6 2.3 Operation Data 6 2.4

  4. National Program for Inspection of Non-Federal Dams. Lower Reservoir Dam (NH 00048), NHWRB Number 108.05, Connecticut River Basin, Hanover, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1979-11-01

    reservoirs, Upper Reservoir and Reservoir No. 3. The reservoir supplies to the water destribution system by gravity. h. Design and Construction History. o...continual supply to the water , destribution system as the main service area is fed by gravity. The waste pipe is usually closed. The flashboards on...however, no design calculations or b construction data were revealed.. The visual inspection revealed that the dam is in poor condition. The visual

  5. VIEW OF FOSSIL CREEK DIVERSION DAM FROM DOWNSTREAM (INCLUDES 1950s ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF FOSSIL CREEK DIVERSION DAM FROM DOWNSTREAM (INCLUDES 1950s AUTOMATIC/REMOTE CONTROL SLUICE GATE IN UPPER CENTER OF DAM, NORTH SIDE). LOOKING NORTH-NORTHWEST - Childs-Irving Hydroelectric Project, Fossil Creek Diversion Dam, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  6. National Program for Inspection of Non-Federal Dams. Lovejoy Pond Dam ME-00022, Androscoggin River Basin, North Wayne, Maine. Phase I Inspection Report.

    DTIC Science & Technology

    1979-04-01

    programs for non-Federal dams. (3) To update, verify and complete the National Inventory of Dams. 1.2 DESCRIPTION OF PROJECT a. Location. The Lovejoy Pond...BUREAU OF STANDARDS- 1963-A 41 ANDROSCOGGIN RIVER BASIN NORTH WAYNE ,MAINE LOVEJOY POND DAM ME-00022 0 PHASE I INSPECTION REPORT NATIONAL DAM INSPECTION...side of necessar mnd idenifIr bioc Sigmmber) DAMS, INSPECTION, DAM SAFETY, * Androscoggin River Basin North Wayne, Maine Lovejoy Pond * 20. ABSTRACT

  7. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  8. National Dam Safety Program. Lake Muskoday Dam (Inventory Number N.Y. 341) Delaware River Basin, Sullivan County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    DACW-51-81-C-0006 . PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT PROJECT. TASK AREA & WORK UNIT NUMBERS ~ Flaherty-Giauara Associates...olie It neceary and Idontily b block number) Dam Safety National Dam Safety Program Visual Inspection Lake Muskoday Dam Hydrology, Structural Stability...DELAWARE RIVER BASIN LAKE MUSKODAY DAM SULLIVAN COUNTY, NEW YORK INVENTORY No.NY341 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY PROGRAM J T C NEW YORK

  9. Dam impacts on and restoration of an alluvial river-Rio Grande, New Mexico

    Treesearch

    Gigi Richard; Pierre Julien

    2003-01-01

    The impact of construction of dams and reservoirs on alluvial rivers extends both upstream and downstream of the dam. Downstream of dams, both the water and sediment supplies can be altered leading to adjustments in the river channel geometry and ensuing changes in riparian and aquatic habitats. The wealth of pre and post-regulation data on the Middle Rio Grande, New...

  10. 12. Credit PED. View of tail race and dam showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Credit PED. View of tail race and dam showing dumping of construction rubble into river bed by rail car; and preparations for pouring a concrete cap onto tail race wall. Photo c. 1909. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  11. Application of Bayesian networks in a hierarchical structure for environmental risk assessment: a case study of the Gabric Dam, Iran.

    PubMed

    Malekmohammadi, Bahram; Tayebzadeh Moghadam, Negar

    2018-04-13

    Environmental risk assessment (ERA) is a commonly used, effective tool applied to reduce adverse effects of environmental risk factors. In this study, ERA was investigated using the Bayesian network (BN) model based on a hierarchical structure of variables in an influence diagram (ID). ID facilitated ranking of the different alternatives under uncertainty that were then used to evaluate comparisons of the different risk factors. BN was used to present a new model for ERA applicable to complicated development projects such as dam construction. The methodology was applied to the Gabric Dam, in southern Iran. The main environmental risk factors in the region, presented by the Gabric Dam, were identified based on the Delphi technique and specific features of the study area. These included the following: flood, water pollution, earthquake, changes in land use, erosion and sedimentation, effects on the population, and ecosensitivity. These risk factors were then categorized based on results from the output decision node of the BN, including expected utility values for risk factors in the decision node. ERA was performed for the Gabric Dam using the analytical hierarchy process (AHP) method to compare results of BN modeling with those of conventional methods. Results determined that a BN-based hierarchical structure to ERA present acceptable and reasonable risk assessment prioritization in proposing suitable solutions to reduce environmental risks and can be used as a powerful decision support system for evaluating environmental risks.

  12. Lac Courte Oreilles Hydro Dam Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Jason; Meyers, Amy

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  13. Outlet Works for Cerrillos Dam, Cerrillos River, and Portugues Dam, Portugues River, Puerto Rico; Hydraulic Model Investigation.

    DTIC Science & Technology

    1979-03-01

    Tests were conducted on a 1:24-scale model of the outlet works for the Cerrillos and Portugues Dams located in Puerto Rico. The purpose of the model... Portugues outlet works were designed to provide for river diversion during construction of the dams. When the dams are completed, the flow will be regulated... Portugues . However, the stilling basins were designed for 2500 cfs (Cerrillos) and 1100 cfs ( Portugues ), the bank-full capacities downstream. Therefore

  14. Decadal and seasonal scale changes of an artificial lake environment after blocking tidal flows in the Yeongsan Estuary region, Korea.

    PubMed

    Lee, Young Geun; An, Kwang-Guk; Ha, Phuc Thi; Lee, Keun-Young; Kang, Joo-Hyon; Cha, Sung Min; Cho, Kyung Hwa; Lee, Yun Seok; Chang, In Seop; Kim, Kyoung-Woong; Kim, Joon Ha; Kimj, Joon Ha

    2009-11-15

    Artificial lakes, initially built in estuaries for positive purposes such as flood prevention and providing irrigation water, have been found to have negative impacts including blocking tidal cycles, disappearance of brackish water zones, sediment increase, water pollution, change of microbial diversity inhabiting patterns, and a decline in fish diversity. In this study, multidisciplinary field studies including physical, chemical, and biological analyses were performed to demonstrate decadal and seasonal scale changes in the ecological environment in Yeongsan Reservoir (YSR), Korea, since the construction of a 4.35 km-long dam in 1981. The results of the study show that the volume of sediment accumulated in YSR was 75.2 million m(3) since the dam was constructed, resulting in a 33.6% reduction of the total water storage capacity. Also, water quality in YSR was affected by complex physico-chemical and hydrological phenomena, including saline and thermal stratifications, and pollutant loadings leading to eutrophication. Subsequent sediment bacteria analyses showed microbial diversity according to different depths in sediment, indicating the environmental change of sediment ecology. Moreover, the fish diversity in this study (2006-2007) was found to be considerably reduced compared to a similar study in 1989 (42% reduction), and the ecological health was deemed to be in a "poor" condition based on the 10-metric Lentic Ecosystem Health Assessment (LEHA) model. Accordingly, these results indicate that aquatic ecosystems are detrimentally affected by estuarine dams that block tidal flows, and when applied to short/long-term management strategies for artificial lakes in estuaries, suggest that similar construction projects have to be suitably controlled.

  15. Examining the economic impacts of hydropower dams on property values using GIS.

    PubMed

    Bohlen, Curtis; Lewis, Lynne Y

    2009-07-01

    While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water function as real estate amenities and boost local property values. Results with respect to the effect of proximity to hydropower generating plants are equivocal. Homeowners pay a small premium for houses close to hydropower dams in our region, but the statistical significance of that result depends on the specific model form used to estimate the effect. Consideration of the social and economic impacts of dam removal-based river restoration can complement studies of the ecological impacts of the practice. Such studies help us understand the extent to which human society's subjective perception of value of aquatic ecosystems relates to objective measures of ecosystem health. The paper also illustrates how geographic information systems (GIS) can help inform these analyses.

  16. 77 FR 40607 - Whitman River Dam, Inc.; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Dam, Inc.; Notice of Availability of Environmental Assessment In accordance with the National... for an original license for the Crocker Dam Hydroelectric Project, to be located on the Whitman River... Energy Regulatory Commission, 888 First Street, Washington, DC 20426. Please affix ``Crocker Dam...

  17. 18 CFR 11.5 - Exemption of minor projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Government Dams § 11.5 Exemption of minor projects. No exemption will be made from payment of annual charges for the use of Government dams or tribal lands within Indian reservations but licenses may be issued...

  18. 18 CFR 11.5 - Exemption of minor projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Government Dams § 11.5 Exemption of minor projects. No exemption will be made from payment of annual charges for the use of Government dams or tribal lands within Indian reservations but licenses may be issued...

  19. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...

  20. 71. AVALON DAM Photographic copy of historic photo, 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    71. AVALON DAM - Photographic copy of historic photo, 1911 (original print located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'VIEW SHOWING CONSTRUCTION OF THE CYLINDER GATES' - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  1. 8. VIEW OF STEEL, STOCKDRAWN EARTH SCRAPER USED TO SCAPE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF STEEL, STOCK-DRAWN EARTH SCRAPER USED TO SCAPE EARTH BORROW MATERIAL AND TRANSPORT IT TO DAM DURING CONSTRUCTION, LOOKING SOUTH - High Mountain Dams in Upalco Unit, Five Point Lake Dam, Ashley National Forest, 12 miles Northwest of Swift Creek Campground, Mountain Home, Duchesne County, UT

  2. Assessment of the Fishery Improvement Opportunities on the Pend Oreille River: Recommendations for Fisheries Enhancement: Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashe, Becky L.; Scholz, Allan T.

    1992-03-01

    This report recommends resident fish substitution projects to partially replace anadromous fish losses caused by construction of Grand Coulee and Chief Joseph Dams. These recommendations involve enhancing the resident fishery in the Pend Oreille River as a substitute for anadromous fish losses. In developing these recommendations we have intentionally attempted to minimize the impact upon the hydroelectric system and anadromous fish recovery plans. In this report we are recommending that the Northwest Power Planning Council direct Bonneville Power Administration to fund the proposed enhancement measures as resident fish substitution projects under the NPPC's Columbia Basin Fish and Wildlife Program. Themore » Pend Oreille River, located in northeast Washington, was historically a free flowing river which supported anadromous steelhead trout and chinook salmon, and large resident cutthroat trout and bull trout. In 1939, Grand Coulee Dam eliminated the anadromous species from the river. In 1955, Box Canyon Dam was constructed, inundating resident trout habitat in the river and creating many back water and slough areas. By the late 1950's the fishery in the reservoir had changed from a quality trout fishery to a warm water fishery, supporting largemouth bass, yellow perch and rough fish (tenth, suckers, squawfish). The object of this study was to examine the existing fishery, identify fishery improvement opportunities and recommend fishery enhancement projects. Three years of baseline data were collected from the Box Canyon portion of the Pend Oreille River to assess population dynamics, growth rates, feeding habits, behavior patterns and factors limiting the fishery. Fishery improvement opportunities were identified based on the results of these data. Relative abundance surveys in the reservoir resulted in the capture of 47,415 fish during the study. The most abundant species in the reservoir were yellow perch, composing 44% of the fish captured. The perch population in the river is stunted and therefore not popular with anglers. Pumpkinseed composed 16% of the total catch, followed by tenth (9%), largemouth bass (8%), mountain whitefish (6%), largescale sucker (5%), northern squawfish (4%) and longnose sucker (3%).« less

  3. Hartwell Lake Project, Savannah River, Georgia and South Carolina. Rehabilitation of Clemson Upper Diversion Dam. Construction Foundation Report. Volume 2. Appendices B thru E

    DTIC Science & Technology

    1989-08-01

    remove by gravity -washed out 585.8 i -- 89. 2 gneiss from inner - ibarrel Bottom of hole 89.2’ Tape depth 89.0’ 90 -0 I-Note: 6-7-84 water level after...barrel and5 _-_89.3 washed all meterial Bottom of hole 89.3’ left in outer barrel- 90 out of barrel befor- drilling for pull I Tape depth 89.0’ Note

  4. Final Environmental Assessment for Proposed Construction Projects for the 140th Wing, Colorado Air National Guard at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2004-09-01

    biologica l resou rces, cultura l resomces, environmenta l justice, socioeconomics, geology, soUs and topography, water resources, solid and hazardous...is perennial downstream from the base. The streams are tributaries to the South Platte River which is located approximately 15 miles northwest of the...northeast portion of the base and was created by damming a minor tributary to Murphy Creek in 1961. It occupies approximately 10 acres. The lake holds

  5. Risk Costs for New Dams: Economic Analysis and Effects of Monitoring

    NASA Astrophysics Data System (ADS)

    Paté-Cornell, M. Elisabeth; Tagaras, George

    1986-01-01

    This paper presents new developments and illustrations of the introduction of risk and costs in cost-benefit analysis for new dams. The emphasis is on a method of evaluation of the risk costs based on the structure of the local economy. Costs to agricultural property as well as residential, commercial, industrial, and public property are studied in detail. Of particular interest is the case of sequential dam failure and the evaluation of the risk costs attributable to a new dam upstream from an existing one. Three real cases are presented as illustrations of the method: the Auburn Dam, the Dickey-Lincoln School Project, and the Teton Dam, which failed in 1976. This last case provides a calibration tool for the estimation of loss ratios. For these three projects, the risk-modified benefit-cost ratios are computed to assess the effect of the risk on the economic performance of the project. The role of a warning system provided by systematic monitoring of the dam is analyzed: by reducing the risk costs, the warning system attenuates their effect on the benefit-cost ratio. The precursors, however, can be missed or misinterpreted: monitoring does not guarantee that the risks to human life can be reduced to zero. This study shows, in particular, that it is critical to consider the risk costs in the decision to build a new dam when the flood area is large and densely populated.

  6. National Program for Inspection of Non-Federal Dams, Wheeler Dam (NH 00028), Arlington Mill Reservoir, Merrimack River Basin, Salem, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1978-08-01

    dam is a concrete gravity dam with earth abutments. It is 730 ft. long and the maximum height of it is 54 ft. The dam is assessed to be in poor...concrete gravity dam with earth abutments constructed in 1920. Overall length is 730 feet and maximum height is 54 feet. The Spicket River flows 5...the Spillway Test flood is based on the estimated "Probable Maximum Flood" for the region ( greatest reasonably possible storm runoff), or fractions

  7. 10. Photographic copy of copy of original construction drawing, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of copy of original construction drawing, dated 1899?. Original in possession of Twin Lakes Reservoir and Canal Company, Ordway, Colorado. PLAN OF DAM AND HEAD GATES FOR THE TWIN LAKES RESERVOIR. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  8. 6. Photographic copy of original construction drawing, no date, from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of original construction drawing, no date, from files in the Office of the Chief Engineer, U.S. Fish and Wildlife Service Regional Office, Denver. GATE CONTROL STRUCTURE (generic drawing used for all five dams in refuge) - J. Clark Salyer National Wildlife Refuge Dams, Along Lower Souris River, Kramer, Bottineau County, ND

  9. 75 FR 28000 - Cellu Tissue Corporation; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2851-016] Cellu Tissue..., 2010. d. Applicant: Cellu Tissue Corporation. e. Name of Project: Natural Dam Hydroelectric Project. f.... h. Agent Contact: Chris Fiedler or Robin Gaumes, Cellu Tissue Corp., Natural Dam Mill, 4921 Route...

  10. Geomorphology of the Elwha River and its Delta: Chapter 3 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

    USGS Publications Warehouse

    Warrick, Jonathan A.; Draut, Amy E.; McHenry, Michael L.; Miller, Ian M.; Magirl, Christopher S.; Beirne, Matthew M.; Stevens, Andrew Stevens; Logan, Joshua B.; Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    The removal of two dams on the Elwha River will introduce massive volumes of sediment to the river, and this increase in sediment supply in the river will likely modify the shapes and forms of the river and coastal landscape downstream of the dams. This chapter provides the geologic and geomorphologic background of the Olympic Peninsula and the Elwha River with emphasis on the present river and shoreline. The Elwha River watershed was formed through the uplift of the Olympic Mountains, erosion and movement of sediment throughout the watershed from glaciers, and downslope movement of sediment from gravitational and hydrologic forces. Recent alterations to the river morphology and sediment movement through the river include the two large dams slated to be removed in 2011, but also include repeated bulldozing of channel boundaries, construction and maintenance of flood plain levees, a weir and diversion channel for water supply purposes, and engineered log jams to help enhance river habitat for salmon. The shoreline of the Elwha River delta has changed in location by several kilometers during the past 14,000 years, in response to variations in the local sea-level of approximately 150 meters. Erosion of the shoreline has accelerated during the past 80 years, resulting in landward movement of the beach by more than 200 meters near the river mouth, net reduction in the area of coastal wetlands, and the development of an armored low-tide terrace of the beach consisting primarily of cobble. Changes to the river and coastal morphology during and following dam removal may be substantial, and consistent, long-term monitoring of these systems will be needed to characterize the effects of the dam removal project.

  11. Cultural Resources Survey, Harry S. Truman Dam and Reservoir Project, Missouri. Volume 8. Archeological Test Excavations: 1976

    DTIC Science & Technology

    1983-02-01

    4 1983 • i • i . _ _ _ - K -^ REPORTS OF THE CULTURAL RISOURCES SURVEY HARRY S. TRUMAN DAM AND RESERVOIR PROJECT...iMiM US Army Corps of Engineers Kansas City District m 00 CO Harry S. Truman 15am and Reservoir, Missouri American Archaeology Division...Department of Anthropology, University of Missouri - Columbia Columbia, Missouri O Cultural Resources Survey Harry S. Truman Dam and eservoir

  12. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...

  13. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  14. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  15. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  16. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bronson, James P.

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survivalmore » of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported adult spring chinook from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. A total of 239 spring chinook were outplanted in August for natural spawning in the basin.« less

  17. Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.

    PubMed

    Fearnside, Phillip M

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.

  18. Local Economic Development and Hydropower Along the Brahmaputra River Basin in Northeast India

    NASA Astrophysics Data System (ADS)

    Mock, A.

    2014-12-01

    Large dams have long been controversial. They offer benefits, such as reduced greenhouse gas emissions, energy security, and local development, yet produce negative social and ecological impact, such as wildlife habitat destruction, human displacement, and the disruption of downstream fishing or agricultural industries. In the past decade, the Indian government has signed Memoranda of Understanding with hydroelectric power companies for the building of over 130 large dams on the Brahmaputra River in the state of Arunachal Pradesh in Northeast India. These dams can generate 43% of India's assessed hydropower potential to sustain India's growing economy. In addition, the Indian government claims that these dams will bring local development with needed jobs. However, local Arunachali people have protested and temporarily halted hydropower projects because of the impact of dams on their existing livelihoods. Using the North Eastern Electric Power Corporation's (NEEPCO) Ranganadi Hydroelectric Project as a case study, our project examined whether dams in Northeast India provide jobs for local people, and whether distance from the dam or work colony to a worker's hometown affects the type of job the worker received. Survey data from residents at NEEPCO's work colony in Doimukh, Arunachal Pradesh, was analyzed using SPSS (n = 18). Our research found that 100% of workers at the dam originally resided in Northeast India, with 33% from Arunachal Pradesh, and 67% from the nearby states of Assam, and Tripura. Further, our analysis revealed no statistically significant relationship between the distance to a worker's hometown and job type (p = .609). Where workers come from did not affect the type of job they received. More research using a larger sample size and additional hydroelectric project case studies is needed to further explore the relationship between worker home location and their job types.

  19. 75 FR 47808 - Alabama Municipal Electric Authority; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ..., proposing to study the feasibility of the George W. Andrews Lock and Dam Hydroelectric Project. The proposed project would be located at the existing George W. Andrews Lock and Dam on the Chattahoochee River in...

  20. Longitudinal cracking in concrete at bridge deck dams on structural rehabilitation projects.

    DOT National Transportation Integrated Search

    2012-10-01

    The main objective of this project was to identify the causes of longitudinal cracking in newly placed concrete deck segments adjacent to : bridge deck expansion dam rehabilitations within District 3-0 of the Pennsylvania Department of Transportation...

  1. 33 CFR 222.6 - National Program for Inspection of Non-Federal Dams.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... based upon the location of the dams relative to developed areas): (i) Dams which are in the high hazard... Appreciable (Notable agriculture, industry or structures). High Urban development with more than a small... constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings...

  2. 33 CFR 222.6 - National Program for Inspection of Non-Federal Dams.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... based upon the location of the dams relative to developed areas): (i) Dams which are in the high hazard... Appreciable (Notable agriculture, industry or structures). High Urban development with more than a small... constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings...

  3. 33 CFR 222.6 - National Program for Inspection of Non-Federal Dams.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... based upon the location of the dams relative to developed areas): (i) Dams which are in the high hazard... Appreciable (Notable agriculture, industry or structures). High Urban development with more than a small... constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings...

  4. 33 CFR 222.6 - National Program for Inspection of Non-Federal Dams.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... based upon the location of the dams relative to developed areas): (i) Dams which are in the high hazard... Appreciable (Notable agriculture, industry or structures). High Urban development with more than a small... constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings...

  5. 33 CFR 222.6 - National Program for Inspection of Non-Federal Dams.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... based upon the location of the dams relative to developed areas): (i) Dams which are in the high hazard... Appreciable (Notable agriculture, industry or structures). High Urban development with more than a small... constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings...

  6. 49. McMILLAN DAM Photographic copy of historic photo, c1917 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. McMILLAN DAM - Photographic copy of historic photo, c1917 (original print located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown. VIEW SHOWING CONSTRUCTION OF SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  7. 21. Photocopy of original photo from Corps of Engineers, Los ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) SALINAS DAM UNDER CONSTRUCTION IN 1941. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA

  8. Coastal and lower Elwha River, Washington, prior to dam removal--history, status, and defining characteristics: Chapter 1 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

    USGS Publications Warehouse

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.; Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    Characterizing the physical and biological characteristics of the lower Elwha River, its estuary, and adjacent nearshore habitats prior to dam removal is essential to monitor changes to these areas during and following the historic dam-removal project set to begin in September 2011. Based on the size of the two hydroelectric projects and the amount of sediment that will be released, the Elwha River in Washington State will be home to the largest river restoration through dam removal attempted in the United States. Built in 1912 and 1927, respectively, the Elwha and Glines Canyon Dams have altered key physical and biological characteristics of the Elwha River. Once abundant salmon populations, consisting of all five species of Pacific salmon, are restricted to the lower 7.8 river kilometers downstream of Elwha Dam and are currently in low numbers. Dam removal will reopen access to more than 140 km of mainstem, flood plain, and tributary habitat, most of which is protected within Olympic National Park. The high capture rate of river-borne sediments by the two reservoirs has changed the geomorphology of the riverbed downstream of the dams. Mobilization and downstream transport of these accumulated reservoir sediments during and following dam removal will significantly change downstream river reaches, the estuary complex, and the nearshore environment. To introduce the more detailed studies that follow in this report, we summarize many of the key aspects of the Elwha River ecosystem including a regional and historical context for this unprecedented project.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jody K.

    Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior tomore » release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)« less

  10. Earthshots: Satellite images of environmental change – Lake Turkana, Kenya and Ethiopia

    USGS Publications Warehouse

    ,

    2013-01-01

    Ethiopia is constructing a series of dams on the Omo River. The Gibe I and Gibe II dams are completed, and the Gibe III dam began filling its reservoir in 2015. Studies are ongoing to understand the interactions between regulated flows as a result of the dams and rainfall on the water levels of Lake Turkana. Scientists use many years’ worth of data to get a better understanding of the lake’s natural variability and how that variability might be affected by dams, irrigation, and rainfall.

  11. Grainsize Patterns and Bed Evolution of the Rhone River (France): A Present-day Snapshot Following a Century and a Half of Human Modifications

    NASA Astrophysics Data System (ADS)

    Michal, T.; Parrot, E.; Piegay, H.

    2014-12-01

    Over the past 150 years the Rhône River has been heavily altered by human infrastructures. The first wave (1860 - 1930) of modifications consisted of dikes and groynes designed to narrow the channel and promote incision in order to facilitate navigation. A second period (1948 - 1986) involved the construction of a series of canals and dams for hydroelectricity production. These works bypass multiple reaches of the original channel and drastically reduce the discharge and sediment load reaching them. A comprehensive study underway is aimed at describing the present-day morphology of the Rhone along its 512 km length from its source at Lake Geneva to its sink at the Mediterranean Sea and quantifying the role of management works in the evolution to its current state. Grainsize distributions and armour ratios were determined using a combination of Wolman counts on bars and in shallow channels and dredge samples collected from a boat in navigable reaches. Long profiles were constructed from historical bathymetric maps and bathymetric data collected between 1950 - 2010. Differential long profiles highlighting changes in bed elevation due to sediment storage and erosion were analyzed for three different periods: post-channelization, post-dam construction, and a recent period of major floods. Results show a complex discontinuous pattern in grainsize associated with hydraulic discontinuities imposed by dams. The D50 for bypass reaches is 45 mm compared to a D50 of 34 mm in the non-bypass reaches. The lower D50 as well as a finer tailed distribution in non-bypass reaches reflects fining associated with storage upstream of dams. Armour ratios are on average around 2 but are notably higher for reaches in the middle section of the Rhone. The average incision rate was 1.8 cm/yr for the period of post-channelization and 1.2 cm/yr following dam construction, suggesting the post-dam Rhone was already partially armoured due to incision associated with channelization preceding dam construction. A period marked by large floods between 2001 - 2003 had an average incision rate of approximately 3 cm/yr. Changes in bed elevation for this period highlight destocking and restocking of fine sediments in reservoirs upstream of dams. Only a few downstream reaches where floods were most intense and grainsize is finer were truly active.

  12. 78 FR 38307 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    .... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...

  13. 18 CFR 11.3 - Use of government dams, excluding pumped storage projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Use of government dams, excluding pumped storage projects. 11.3 Section 11.3 Conservation of Power and Water Resources FEDERAL... charge for the project made pursuant to section 10(e) of the Federal Power Act. (b) Graduated flat rates...

  14. Small watershed response to porous rock check dams in a semiarid watershed

    NASA Astrophysics Data System (ADS)

    Nichols, Mary; Polyakov, Viktor; Nearing, Mark

    2016-04-01

    Rock check dams are used throughout the world as technique for mitigating erosion problems on degraded lands. Increasingly, they are being used in restoration efforts on rangelands in the southwestern US, however, their impact on watershed response and channel morphology is not well quantified. In 2008, 37 porous rock structures were built on two small (4.0 and 3.1 ha) instrumented watersheds on an alluvial fan at the base of the Santa Rita Mountains in southern Arizona, USA. 35 years of historical rainfall and runoff, and sediment data are available to compare with 7 years of data collected after check dam construction. In addition, post construction measurements of channel geometry and longitudinal channel profiles were compared with pre-construction measurements to characterize the impact of check dams on sediment retention and channel morphology. The primary impact of the check dams is was retention of channel sediment and reduction in channel gradient; however response varied between the proximal watersheds with 80% of the check dams on one of the watersheds filled to 100% of their capacity after 7 runoff seasons. In addition, initial impact on precipitation runoff ratios is was not persistent. The contrasting watershed experiences lower sediment yields and only 20% of the check dams on this watershed are were filled to capacity and continue to influence runoff during small events. Within the watersheds the mean gradient of the channel reach immediately upstream of the structures has been reduced by 35% (from 0.061 to 0.039) and 34% on (from 0.071 to 0.047).

  15. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon.

    PubMed

    Bobrowiec, Paulo Estefano D; Tavares, Valéria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Antônio hydroelectric dam, Southwestern Brazilian Amazonia before its construction to estimate how the fauna and its associated habitats would be affected by the upcoming impacts. We surveyed bats in 49 plots distributed along the areas going to be inundated by the dam and those remaining dry. As predictors for the species distribution, we tested the variables of vegetation structure and topography. Species composition largely differed between the dry plots and the plots located in areas that will be flooded, and this was strongly associated with the variables of forest basal area and elevation. Vegetation-related variables also had strong influence on the guilds distribution. The flooding of lower elevations areas is expected to negatively affect the species number and abundance of frugivorous species. In contrast, it is likely that animalivores will be less vulnerable to dam-induced flooding, since they were abundant in the areas not expect to be inundated. We urge for the implementation of studies to predict impacts caused by large hydroelectric dams, including tests of the influence of the local conditions that shape diversity to avoid massive losses of the biota, and to build preventive monitoring and management actions.

  16. Applying dam height-storage curve to geomorphic features analysis within virtual geographic environment: a case study of the Hong-Shi-Mao watershed

    NASA Astrophysics Data System (ADS)

    Wang, Daojun; Gong, Jianhua; Ma, Ainai; Li, Wenhang; Wang, Xijun

    2005-10-01

    There are generally two kinds of approaches to studying geomorphic features in terms of the quantification level and difference of major considerations. One is the earlier qualitative characterization, and the other is the 2-dimension measurement that includes section pattern and projection pattern. With the development of geo-information technology, especially the 3-D geo-visualization and virtual geographic environments (VGE), 3-dimension measurement and dynamic interactive between users and geo-data/geo-graphics can be developed to understand geomorphic features deeply, and to benefit to the effective applications of such features for geographic projects like dam construction. Storage-elevation curve is very useful for site selection of projects and flood dispatching in water conservancy region, but it is just a tool querying one value from the other one. In fact, storage-elevation curve can represent comprehensively the geomorphic features including vertical section, cross section of the stream and the landform nearby. In this paper, we use quadratic regression equation shaped like y = ax2 + bx + c and the DEM data of Hong-Shi-Mao watershed, Zi Chang County, ShaanXi Province, China to find out the relationship between the coefficients of the equation and the geomorphic features based on VGE platform. It's exciting that the coefficient "a" appear to be correlative strongly with the stream scale, and the coefficient "b" may give an index to the valley shape. In the end, we use a sub-basin named Hao-Jia-Gou of the watershed as an application. The result of correlative research about quadratic regression equation and geomorphic features can save computing and improve the efficiency in silt dam systems planning.

  17. Feasibility of determination of low-head hydroelectric power development at existing sites: Brighton Dam hydroelectric development. Feasibility report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Will, Alan L.

    1979-04-01

    The redevelopment of the hydroelectric facility at Brighton Dam near Laurel, Maryland has been found to be both technically and financially feasible, the benefit to cost ratio being 1.53:1 compared with an equivalent coal-based generation source. Environmental impacts have been assessed as relatively slight, but some problems, due to poor water quality at the bottom of the reservoir are anticipated and solutions for these would have to be worked out. The benefit to cost ratio could thus be marginally decreased, but the relative costs of one alternative scheme compared to another would not be affected. There is no apparent impedimentmore » to proceeding with the work. The selected development would have a single hydroelectric generating unit of 500 kW rated capacity. The gross generation from the project would be 2,840,000 kWh in the year with average rainfall. It is estimated that the total project cost would be $734,000 (at third quarter 1978 price levels), with no allowance for funds during construction (AFDC). Based on 6.25% cost of money, the project would provide power at a levelized cost over the plant lifetime of approximately 23.3 mills per kWh with no AFDC or 24.6 mills/kWh with AFDC. At present, WSSC electrical power demands at Brighton Dam amount to 147,000 kWh per year which is met by Baltimore Gas and Electric Company (BG and E). This represents only 5% of the potential generation at the site and BG and E have agreed in principal to purchase the surplus power.« less

  18. 5. DETAIL VIEW OF TOE SPILLWAY SECTION OF LOWWATER DAM, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. DETAIL VIEW OF TOE SPILLWAY SECTION OF LOW-WATER DAM, LOOKING NORTHWEST (UPSTREAM). ST. LOUIS WATER DEPARTMENT INTAKE IN BACKGROUND - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL

  19. 41. LOCK AND DAM NO. 26 (REPLACEMENT). LOCK LOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. LOCK AND DAM NO. 26 (REPLACEMENT). LOCK -- LOCK GATES -- LIFT GATE, GATE LEAVES -- GENERAL ASSEMBLY. M-L 26(R) 21/28 - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 26R, Alton, Madison County, IL

  20. Applicability of the World Commission on Dams' recommendations for public financial institutions: a case for Japanese yen loan assistance

    NASA Astrophysics Data System (ADS)

    Fujikura, Ryo; Nakayama, Mikiyasu; Mori, Katsuhiko

    2003-10-01

    The World Commission on Dams (WCD) published Dams and Development as its only and final report in November 2000. Identifying core values and strategic priorities, the report proposed internationally acceptable criteria and standards. Despite the fact that the WCD itself did not intend that the report be used as a blueprint, many non-governmental organizations strongly support the report and the criteria and guidelines recommended in the report, and demand that they be adopted in their current form by funding organizations. The WCD criteria and guidelines were found to have several methodological problems, and it appears impossible to apply the recommended criteria and guidelines as they stand. This study examines the applicability of the WCD criteria and guidelines for public financing institutes involved in overseas development assistance and proposes necessary measures to increase their applicability in order to realize core values and strategic priorities. The character of and relationships among key decision points, strategic priorities, criteria, and guidelines should be clarified. Then, this study examines the applicability of the WCD recommendations for Japanese public financial institutions, as Japan has nearly become the sole bilateral donor providing financial assistance (loans) for large dam construction projects. The public financial institution can only be mandated to check the legal status of the decisions made regarding Stages 1 and 2 which are the first two of the five successive stages from the planning to the operation of the dam project. Needs assessment and alternative selection are expected to be conducted at Stage 1 and 2 respectively. The Japan Bank for International Cooperation (JBIC), which deals with the Japanese concessional yen loan, and the Japan International Cooperation Agency (JICA), which is in charge of technical assistance, are featured in this study. As for the Japanese concessional yen loan assistance, there are other inherent problems for adopting the recommendations. First, it is not clear which government agency officially and substantially carries the decision-making responsibility. Second, JBIC may be involved only when Stage 2 has been completed, and it should be decided and clarified to what extent the Japanese government, as well as JIBC and JICA, should be involved in Stages 1 and 2 (2A: intensive studies on alternatives) of a project for which funding is requested. These issues need to be solved if the Japanese government wishes to adopt the recommendations. Copyright

  1. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  2. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  3. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  4. 53. McMILLAN DAM Photographic copy of historic photo, 1937 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. McMILLAN DAM - Photographic copy of historic photo, 1937 (original print in '1937 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN DAM AFTER RECONSTRUCTION' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  5. National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1979-09-01

    2%𔃾 foot long earth embankment with a concrete core wall. The dam is in fair condition. The dam has been classified in the "small" size and in the...The dam at Shoe Pond is a 17 foot high, 250 foot long earth embankment with a concrete core wall. The dam, which was originally constructed in 190I...elevation (EL) 20.5. Discharge flows down a concrete -lined chute and into a lower pond. The difference in elevation between the ""’"_".-..o upper and

  6. Large-scale degradation of Amazonian freshwater ecosystems.

    PubMed

    Castello, Leandro; Macedo, Marcia N

    2016-03-01

    Hydrological connectivity regulates the structure and function of Amazonian freshwater ecosystems and the provisioning of services that sustain local populations. This connectivity is increasingly being disrupted by the construction of dams, mining, land-cover changes, and global climate change. This review analyzes these drivers of degradation, evaluates their impacts on hydrological connectivity, and identifies policy deficiencies that hinder freshwater ecosystem protection. There are 154 large hydroelectric dams in operation today, and 21 dams under construction. The current trajectory of dam construction will leave only three free-flowing tributaries in the next few decades if all 277 planned dams are completed. Land-cover changes driven by mining, dam and road construction, agriculture and cattle ranching have already affected ~20% of the Basin and up to ~50% of riparian forests in some regions. Global climate change will likely exacerbate these impacts by creating warmer and dryer conditions, with less predictable rainfall and more extreme events (e.g., droughts and floods). The resulting hydrological alterations are rapidly degrading freshwater ecosystems, both independently and via complex feedbacks and synergistic interactions. The ecosystem impacts include biodiversity loss, warmer stream temperatures, stronger and more frequent floodplain fires, and changes to biogeochemical cycles, transport of organic and inorganic materials, and freshwater community structure and function. The impacts also include reductions in water quality, fish yields, and availability of water for navigation, power generation, and human use. This degradation of Amazonian freshwater ecosystems cannot be curbed presently because existing policies are inconsistent across the Basin, ignore cumulative effects, and overlook the hydrological connectivity of freshwater ecosystems. Maintaining the integrity of these freshwater ecosystems requires a basinwide research and policy framework to understand and manage hydrological connectivity across multiple spatial scales and jurisdictional boundaries. © 2015 John Wiley & Sons Ltd.

  7. Dams and transnational advocacy: Political opportunities in transnational collective action

    NASA Astrophysics Data System (ADS)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even facilitate the opening of relatively closed IPOS. In contrast, under a relatively closed DPOS and open IPOS, transnational anti-dam advocacy can hardly exist. Without the domestic anti-dam pressure from below, international anti-dam efforts from above are less likely to affect state dam policies or open up closed DPOS.

  8. 2. OVERALL VIEW OF LOWWATER DAM, LOOKING UPSTREAM. CHAIN OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERALL VIEW OF LOW-WATER DAM, LOOKING UPSTREAM. CHAIN OF ROCKS BRIDGE AND ST. LOUIS WATER DEPARTMENT INTAKE IN BACKGROUND, LOOKING NORTHWEST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL

  9. 3D Finite Element Analysis of Yixing CFRD Built on Inclined Mountain Slope

    NASA Astrophysics Data System (ADS)

    Sun, Da Wei; Zhang, Liang; Qing Yao, Hui; Wang, Kang Ping

    2018-05-01

    There are few CFRDs built on steep slope with dam height more than 50 m. So does the relative design and construction experience. The 75 m-high Yixing CFRD was built on steep mountain slope and the 45.9m-high gravity retaining wall was used to against dam sliding. Since the excessive deformation of dam body and perimetric joints would lead to failure of seal materials and cause water leakage, 3D nonlinear finite element stress-deformation analysis was carried out. 3D finite element mesh with 63875 elements including retaining wall and surrounding mountain was established by use of advanced grid discreteness technique. Large scales of equations solving method were adopted in the computer procedure and the calculation time was greatly reduced from former 40 hours to now 45 minutes. Therefore the behavior of the dam, retaining wall and the joint was obtained in a short time, and the results would be helpful to the design and construction of Yixing dam.

  10. The effect of river damming on vegetation: is it always unfavourable? A case study from the River Tiber (Italy).

    PubMed

    Ceschin, Simona; Tombolini, Ilaria; Abati, Silverio; Zuccarello, Vincenzo

    2015-05-01

    River damming leads to strong hydromorphological alterations of the watercourse, consequently affecting river vegetation pattern. A multitemporal and spatial analysis of the dam effect on composition, structure and dynamic of the upstream vegetation was performed on Tiber River at Nazzano-dam (Rome). The main research questions were as follows: How does plant landscape vary over time and along the river? Where does the dam effect on vegetation end? How does naturalistic importance of the vegetation affected by damming change over time? Data collection was performed mapping the vegetation in aerial photos related to the period before (1944), during (1954) and after dam construction (1984, 2000). The plant landscape has significantly changed over time and along the river, particularly as a result of the dam construction (1953). The major vegetation changes have involved riparian forests and macrophytes. Dam effect on vegetation is evident up to 3 km, and gradually decreases along an attenuation zone for about another 3 km. Despite the fact that the damming has caused strong local hydromorphological modification of the river ecosystem transforming it into a sub-lacustrine habitat, it has also led to the formation of wetlands of considerable naturalistic importance. Indeed, in these man-made wetlands, optimal hydrological conditions have been created by favouring both the expansion of pre-existing riparian communities and the rooting of new aquatic communities, albeit typical of lacustrine ecosystems. Some of these plant communities have become an important food resource, refuge or nesting habitats for aquatic fauna, while others fall into category of Natura 2000 habitats. Therefore, river damming seems to have indirectly had a "favourable" effect for habitat conservation and local biodiversity.

  11. 77 FR 29626 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...

  12. 77 FR 785 - BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...

  13. 76 FR 67723 - CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    .... Name of Project: Red Rock Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant.... Army Corps of Engineers' Lake Red Rock Dam. The applicant's proposal also includes the installation of...

  14. 76 FR 14651 - BOST4 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...

  15. 77 FR 786 - BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...

  16. 76 FR 14653 - BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...

  17. 77 FR 29622 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ..., LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bossier Parish, near the Town of Ninock, Louisiana. The proposed...

  18. 77 FR 29623 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ..., LLC (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing U. S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. The proposed...

  19. 76 FR 65717 - City of Broken Bow, OK; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... application for an Original Major License for the Broken Bow Re-Regulation Dam Hydropower Project (FERC Project No. 12470-001). The Broken Bow Re-Regulation Dam Project is proposed to be located on the Mountain Fork River in McCurtain County, Oklahoma, at the U.S. Army Corps of Engineers' Broken Bow Re-Regulation...

  20. [Side Effects of Modernity : Dam Building, Health Care, and the Construction of Power in the Context of the Control of Schistosomiasis in Egypt in the 1960s and early 1970s].

    PubMed

    Brendel, Benjamin

    2017-09-01

    This article analyzes the modernization campaigns in Egypt in the 1960s and early 1970s. The regulation of the Nile by the Aswan High Dam and the resulting irrigation projects caused the rate of schistosomiasis infestation in the population to rise. The result was a discourse between experts from the global north and Egyptian elites about modernization, development aid, dam building and health care. The fight against schistosomiasis was like a cipher, which combined different power-laden concepts and arguments. This article will decode the cipher and allow a deeper look into the contemporary dimensions of power bound to this subject. The text is conceived around three thematic axes. The first deals with the discursive interplay of modernization, health and development aid in and for Egypt. The second focuses on far-reaching and long-standing arguments within an international expert discourse about these concepts. Finally, the third presents an exemplary case study of West German health and development aid for fighting schistosomiasis in the Egyptian Fayoum oasis.

  1. 7. Photographic copy of the original construction drawing, dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of the original construction drawing, dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, ELEVATIONS AND PLANS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  2. 8. Photographic copy of the original construction drawing dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of the original construction drawing dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, SECTIONS AND DETAILS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  3. Can local people also gain from benefit sharing in water resources development? Experiences from dam development in the Orange-Senqu River Basin

    NASA Astrophysics Data System (ADS)

    Mokorosi, Palesa Selloane; van der Zaag, Pieter

    The concept of sharing benefits derived from beneficial uses of water is increasingly embraced in numerous international discourses in place of sharing water in volumes among nations riparian to common water bodies. Many benefit-sharing efforts involve building of dams and inter-basin transfer schemes. These infrastructures have been blamed to be posing environmental and social costs and directly affecting local people ( Gupta and van der Zaag, 2007) [Gupta, J., van der Zaag, P., 2007. Inter-basin water transfers and integrated water resources management: Where engineering, science and politics interlock. Physics and Chemistry of the Earth doi:10.1016/j.pce.2007.04.003]. This paper attempts to find attributes that lead towards recognising the rights of affected people and the mechanisms that may ensure access of direct benefits to them. Four theoretical factors are identified as key in recognising the rights of the affected people and were adopted as the analytical framework: a. Appropriate legal and policy framework, b. Public participation, c. Sustainable compensation measures, and d. Equitable access of derived benefits. In order to complement these theoretical factors, the study compared two large water development projects in the Orange-Senqu river basin: the Orange River Development Project and the Lesotho Highlands Water Project. In both projects, several large dams were constructed and water was transferred from one river into another. The following are the findings of the paper: a) the political environment through the legal and institutional framework plays a major role in protecting or marginalising the affected people; b) compensation measures for lost properties left many affected people destitute and food insecure; c) affected people mainly benefited from the indirect benefits of the projects instead of direct benefits. In order to ensure access to direct benefits for the affected people it is recommended that a) the national legislation must support the concept, b) mechanisms for allocating benefits to the affected people must be defined at project planning stage and should aim at long-term development goals, and c) local authorities must have sufficient capacity to ensure smooth operation.

  4. Colonial Era Impoundment of the Northeastern United States: Beaver Trapping and Low- head Dam Construction

    NASA Astrophysics Data System (ADS)

    Salant, N.; Bain, D.; Brandt, S.

    2008-12-01

    Hydrologic systems of the northeastern United States were transformed by European settler activities. The colonial economy shifted engineered water structures from beaver dams to human dams built for power generation. While the geomorphic effects of human-constructed dams have recently garnered considerable attention, few studies have investigated how intensive trapping for the fur trade, the near extermination of the Northeast beaver population, and the consequent loss of beaver ponds altered the regional water balance. Although reconstructions of colonial beaver populations have been made, none link the decline in beavers to its hydrologic impact. Beaver population models based on pre-colonial population estimates, historic harvest rates, and current-day population dynamics were used to simulate the corresponding decrease in pond numbers over time. Beaver populations declined dramatically during the seventeenth century, with harvest rates estimated at 2,000-10,000 beavers per year, resulting in expatriation in some sub-regions by the early 1700s. Using contemporary estimates of beaver pond volumes, the calculated loss in pond storage between 1600 and 1840 was approximately 17 million cubic meters of water and sediment, considerably larger than estimated storage gains from dam construction in the same period, suggesting that beaver eradication was a major driver of hydrologic change during the colonial era.

  5. 75 FR 4363 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2183-072] Grand River Dam... No.: 2183-072. c. Date Filed: August 4, 2009. d. Applicant: Grand River Dam Authority. e. Name of... 16 U.S.C. 791(a)-825(r). h. Applicant Contact: D. Casey Davis, Grand River Dam Authority, P.O. Box...

  6. 75. AVALON DAM Photographic copy of historic photo, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    75. AVALON DAM - Photographic copy of historic photo, April 10, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'AVALON DAM - CCC ROCK WORK AT SPILLWAY NO. 2' - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  7. 52. McMILLAN DAM Photographic copy of historic photo, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. McMILLAN DAM - Photographic copy of historic photo, January 15, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN DAM - TRIMMING EARTH SLOPE BEFORE GRAVEL PLACING' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  8. 4. DETAIL VIEW OF ROCKFILL SECTION OF LOWWATER DAM, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL VIEW OF ROCKFILL SECTION OF LOW-WATER DAM, LOOKING NORTHEAST (UPSTREAM). CHAIN OF ROCKS BRIDGE AND ST. LOUIS WATER DEPARTMENT INTAKES IN BACKGROUND - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL

  9. Alternatives to Dam Building: Deindustrialization and the Redevelopment of Waterways in the Northeast During the Twentieth Century

    NASA Astrophysics Data System (ADS)

    Taber, J. S.; Pompeii, B. J.; Nicoletti, C.; Lopez-Morales, C. A.

    2010-12-01

    The Northeast United States contains more dams than any other region in the country but it lacks structures on the scale of the Hoover or Bonneville dams in the American West. This work addresses why the Northeast lacks such large dams and how the pattern of small dams within the region shaped its social development. During the twentieth century, changing social and economic conditions rendered the initial purposes of many dams in the region moot, but these structures continued to influence hydrologic conditions and the provision of ecosystem services to an expanding population. The continued existence of many of these dams resulted from a worldview unable to conceive of dam removal as it did to the economic or environmental services provided by the structure. Documenting the process by which society developed alternatives to dam building in this region can contextualize the origins and contingent character of ideas about dam removal. The overarching theme in this process is the deindustrialization of the Northeast, which pitted the interests of industrial cities undergoing economic reorganization, emerging suburban communities, and growing service industries in the region. This paper considers changing attitudes toward dams as part of a four step process: (1) although the mill dams of the industrial revolution remained after electrification rendered manufacturers independent of direct water power in the early twentieth century, deindustrialization reshaped the political and legal responses to flooding by stregnthening the political and economic position of service industries and suburban residential interests; (2) the most tangible response to this development was proposed federal investment in dam building in the region between the 1930s and the 1950s; (3) political conflicts between local interests and federal proposals for dam construction slowed down the dam building process and enabled people to consider alternative strategies for flood control and power generation; and (4) these alternatives included conservation measures such as the preservation of wetlands, but they also included the construction of coal and nuclear power plants in place of hydroelectric dams. Documenting the complexities underlying dam building and its alternatives in a deindustrializing region saddled with obsolete dams can contextualize contemporary debates regarding the maintenance or removal of old dams.

  10. Sediment trapping efficiency of adjustable check dam in laboratory and field experiment

    NASA Astrophysics Data System (ADS)

    Wang, Chiang; Chen, Su-Chin; Lu, Sheng-Jui

    2014-05-01

    Check dam has been constructed at mountain area to block debris flow, but has been filled after several events and lose its function of trapping. For the reason, the main facilities of our research is the adjustable steel slit check dam, which with the advantages of fast building, easy to remove or adjust it function. When we can remove transverse beams to drain sediments off and keep the channel continuity. We constructed adjustable steel slit check dam on the Landow torrent, Huisun Experiment Forest station as the prototype to compare with model in laboratory. In laboratory experiments, the Froude number similarity was used to design the dam model. The main comparisons focused on types of sediment trapping and removing, sediment discharge, and trapping rate of slit check dam. In different types of removing transverse beam showed different kind of sediment removal and differences on rate of sediment removing, removing rate, and particle size distribution. The sediment discharge in check dam with beams is about 40%~80% of check dam without beams. Furthermore, the spacing of beams is considerable factor to the sediment discharge. In field experiment, this research uses time-lapse photography to record the adjustable steel slit check dam on the Landow torrent. The typhoon Soulik made rainfall amounts of 600 mm in eight hours and induced debris flow in Landow torrent. Image data of time-lapse photography demonstrated that after several sediment transport event the adjustable steel slit check dam was buried by debris flow. The result of lab and field experiments: (1)Adjustable check dam could trap boulders and stop woody debris flow and flush out fine sediment to supply the need of downstream river. (2)The efficiency of sediment trapping in adjustable check dam with transverse beams was significantly improved. (3)The check dam without transverse beams can remove the sediment and keep the ecosystem continuity.

  11. Elwha River dam removal-Rebirth of a river

    USGS Publications Warehouse

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    After years of planning for the largest project of its kind, the Department of the Interior will begin removal of two dams on the Elwha River, Washington, in September 2011. For nearly 100 years, the Elwha and Glines Canyon Dams have disrupted natural processes, trapping sediment in the reservoirs and blocking fish migrations, which changed the ecology of the river downstream of the dams. All five Pacific salmon species and steelhead-historically present in large numbers-are locally extirpated or persist in critically low numbers. Upstream of the dams, more than 145 kilometers of pristine habitat, protected inside Olympic National Park, awaits the return of salmon populations. As the dams are removed during a 2-3 year project, some of the 19 million cubic meters of entrapped sediment will be carried downstream by the river in the largest controlled release of sediment into a river and marine waters in history. Understanding the changes to the river and coastal habitats, the fate of sediments, and the salmon recolonization of the Elwha River wilderness will provide useful information for society as future dam removals are considered.

  12. National Dam Safety Program. Burt Dam (Inventory Number N.Y. 745), Lake Ontario Basin, Niagara County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-08-27

    kowledge and belkef -4’dleport New York .- ** ~ : ~ ’"’*tckport & Newfane Power & Water Su pp7 Cc A~’l 41924 - na. r w -Mob. -4 90- -, ..’a If -- -N n 9. 4...converting the dam to power generation is pending with the Federal Energy Regulatory Commission by: J. W. Company Jeffery Moon, President 55 Union Place...Manchester, Connecticut 06040 Tele: (207) 775-5401 f. Purpose of Dam Burt Dam was originally constructed for hydroelectric power j generation. It

  13. Coastal habitats of the Elwha River, Washington- Biological and physical patterns and processes prior to dam removal

    USGS Publications Warehouse

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    Together, these different scientific perspectives form a basis for understanding the Elwha River ecosystem, an environment that has and will undergo substantial change. A century of change began with the start of dam construction in 1910; additional major change will result from dam removal scheduled to begin in September 2011. This report provides a scientific snapshot of the lower Elwha River, its estuary, and adjacent nearshore ecosystems prior to dam removal that can be used to evaluate the responses and dynamics of various system components following dam removal.

  14. Modeling and sediment study in the watershed Medjerda, Tunisia

    NASA Astrophysics Data System (ADS)

    Kotti, Fatma; Mahé, Gil; Habaieb, Hamadi; Dieulin, Claudine; Hermassi, Taoufik

    2015-04-01

    Water projects have experienced a major expansion in the late 1980s, and we now have sufficient perspective to assess their actual performance and their socio-environmental impacts (Payan, 2007). This study focuses on the great watershed of Tunisia namely Medjerda which has an area of about 23,600 km2. In the main river of Medjerda some dams have been created for water retention: Sidi Salem Dam (the largest in the country), El Aroussia dam, and others on tributaries Mellegue Bouhertma, Siliana, Beni Mtir, Lakhemess and Kasseb. Since the construction of dams, essentially Sidi Salem and Siliana, the Medjerda river has undergone significant changes in morphology. The monitoring of the flow of the major hydrological stations in the pre-estuarine zone downstream from Sidi Salem dam is used to measure the impact of the constructions on hydrological regimes: reduction in average rates, reduction in volumes sold, altered seasonal pattern, and most of all reduction of the sediment transport, which the highest values are related to extreme events. In this context, the balance of sediment monitoring appears indispensable for the quantification of sediment transport at the outlet. Our approach is to calculate a specific flow rate relative to the area of the basin for every structure built in the Medjerda watershed, from the information available on transport and sedimentation rates known, combined with contours of each sub watershed. There are about ten dams spread throughout Medjerda watershed. The methodology is primarily developed for the Mellegue dam because we have at this station a long data set from 1955 until 2005. Other stations will be studied later on. The main objective of this study is to provide a series of annual variation of theoretical contributions. These calculated values will be compared with the actual measured sedimentary series. Two cores in the sediments of the pre-estuarine area are performed to determine past variability in sediment inputs over a time series than should be about one century. The cores' analysis results show a succession of sedimentary layers that likely correspond to different flood deposits that succeeded on this site, and especially the datation of the cores shows that the selected area is a very important deposition area. This sedimentary study will help estimate the sediment dynamics to major estuaries, which is poorly known for most of the rivers of Maghreb. The reduction of the sediment supply to the sea is tipped as a major factor to be taken into account for a better understanding of the dynamics of coastal areas in the context of global climate change and sea level rise. Keywords: sediment core, Medjerda watershed, dam, hydrology, modeling, Tunisia

  15. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon

    PubMed Central

    Tavares, Valéria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Antônio hydroelectric dam, Southwestern Brazilian Amazonia before its construction to estimate how the fauna and its associated habitats would be affected by the upcoming impacts. We surveyed bats in 49 plots distributed along the areas going to be inundated by the dam and those remaining dry. As predictors for the species distribution, we tested the variables of vegetation structure and topography. Species composition largely differed between the dry plots and the plots located in areas that will be flooded, and this was strongly associated with the variables of forest basal area and elevation. Vegetation-related variables also had strong influence on the guilds distribution. The flooding of lower elevations areas is expected to negatively affect the species number and abundance of frugivorous species. In contrast, it is likely that animalivores will be less vulnerable to dam-induced flooding, since they were abundant in the areas not expect to be inundated. We urge for the implementation of studies to predict impacts caused by large hydroelectric dams, including tests of the influence of the local conditions that shape diversity to avoid massive losses of the biota, and to build preventive monitoring and management actions. PMID:28886029

  16. An improved robust buffer allocation method for the project scheduling problem

    NASA Astrophysics Data System (ADS)

    Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad

    2017-04-01

    Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.

  17. 15. DETAIL EXTERIOR VIEW LOOKING NORTH SHOWING REINFORCED CONCRETE PILLBOX ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. DETAIL EXTERIOR VIEW LOOKING NORTH SHOWING REINFORCED CONCRETE PILLBOX ON BRADFORD ISLAND END OF DAM/SPILLWAY; THE PILLBOX WAS BUILT DURING WORLD WAR II TO HELP PROTECT THE DAM/SPILLWAY FROM SABOTAGE. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  18. 16. Photocopy of a photograph (original in the Collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of a photograph (original in the Collection of the Salt Lake City Engineer's Office)--ca. 1924--GENERAL VIEW OF DOWNSTREAM SIDE OF DAM JUST PRIOR TO CONSTRUCTION OF THE TOP FORTY FEET OF THE DAM - Mountain Dell Dam, Parley's Canyon, Northwest side of I-80, West of State Route 39, Salt Lake City, Salt Lake County, UT

  19. 77 FR 67813 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... period January 1, 2009, through September 30, 2012. However, the current rate schedule will expire...) prepared a 2012 Current Power Repayment Study using the existing Sam Rayburn Dam Project rate schedule and... because the current rate expires September 30, 2012. Southwestern will reevaluate the ability of the...

  20. 18 CFR 12.31 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 12.31 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... downstream tow of the dam to the lowest point on the crest of the dam. (d) Gross storage capacity means the...

  1. 77 FR 59395 - Grand River Dam Authority; Notice of Revised Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2524-018--Oklahoma Salina Pumped Storage Project] Grand River Dam Authority; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice...

  2. 7. WEST DAM STRUCTURE, LOOKING NORTHWEST. QUARRIES AT BOTTOM; OUTLET ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WEST DAM STRUCTURE, LOOKING NORTHWEST. QUARRIES AT BOTTOM; OUTLET STRUCTURE UNDER CONSTRUCTION CUTTING INTO HILL AT TOP OF PICTURE. - Eastside Reservoir, Diamond & Domenigoni Valleys, southwest of Hemet, Hemet, Riverside County, CA

  3. 26. GENERAL VIEW LOOKING NORTH SHOWING THE STRUCTURAL PIERS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. GENERAL VIEW LOOKING NORTH SHOWING THE STRUCTURAL PIERS AND DRAFT CONE UNDER CONSTRUCTION. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  4. 76 FR 21885 - BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to...

  5. Spokane Tribal Hatchery, 2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery,more » Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the success of hatchery/net pen stocking on the number of harvestable fish. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue hatchery-rearing practices to reduce precocity rates of kokanee and continue new kokanee stocking strategies associated with increased kokanee harvest rates.« less

  6. 23. Photocopy of a photograph (original print in the collection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of a photograph (original print in the collection of the New Hampshire Water Resources Board, Concord, New Hampshire) 1927, photographer unknown 2 3/8 X 4 inch negative BUILDING OF DAM No. 3, LOOKING EASTWARDS FROM THE NORTH BANK. CONSTRUCTION OF THE WOODEN FORMWORK USED IN CONSTRUCTING THE DAM IS VISIBLE IN THE FOREGROUND - Claremont Village Industrial District, Between B, Claremont, Sullivan County, NH

  7. French Modular Impoundment: Final Cost and Performance Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drown, Peter; French, Bill

    This report comprises the Final Cost and Performance Report for the Department of Energy Award # EE0007244, the French Modular Impoundment (aka the “French Dam”.) The French Dam is a system of applying precast modular construction to water control structures. The “French Dam” is a term used to cover the construction means/methods used to construct or rehabilitate dams, diversion structures, powerhouses, and other hydraulic structures which impound water and are covered under FDE’s existing IP (Patents # US8414223B2; US9103084B2.)

  8. DAM Safety and Deformation Monitoring in Dams

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.; Potts, L.; Miiama, J.; Mahgoub, M.; Rahman, S.

    2013-12-01

    Water is the life and necessity to water is increasing day by day with respect to the World population, rising of living standards and destruction of nature. Thus, the importance of water and water structures have been increasing gradually. Dams are among the most important engineering structures used for water supplies, flood controls, agricultural purposes as well as drinking and hydroelectric power. There are about 150.000 large size dams in the World. Especially after the Second World War, higher and larger capacity dams have been constructed. Dams create certain risks like the other manmade structures. No one knows precisely how many dam failures have occurred in the World, whereas hundreds of dam failures have occurred throughout the U.S. history. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some information, safety and the techniques about the deformation monitoring of the dams. Therefore, this study gives essential information about the dam safety and related analysis. Monitoring of dams is crucial since deformation might have occurred as a result of erosion, water load, hydraulic gradients, and water saturation. The case study is the deformation measurements of Ataturk Dam. This dam was constructed on Firat River and it has importance for providing drinking water, hydroelectric power and especially irrigation. In addition, brief information is given about this dam and the methods of geodetic and non-geodetic monitoring measurements applied by various disciplines. Geodetic monitoring methods are emphasized in this study. Some results have been obtained from this method for nearly seven years are presented in this work. In addition, some deformation predictions have been made especially for the cross sections where the maximum deformations took place.

  9. [Ecological risk assessment of hydropower dam construction on aquatic species in middle reaches of Lancang River, Southwest China based on ESHIPPO model].

    PubMed

    Li, Xiao-Yan; Peng, Ming-Chun; Dong, Shi-Kui; Liu, Shi-Liang; Li, Jin-Peng; Yang, Zhi-Feng

    2013-02-01

    An investigation was conducted on the phytoplankton, zooplankton, and fish at 8 sampling sections in the Manwan Reservoir before and after the construction of Xiaowan Hydropower Dam. The modified ESHIPPO model was applied to study the changes of the featured aquatic species, including endangered species, endemic specie, peis resource species, and native fish, aimed to make an ecological risk assessment of the dam construction on the aquatic species. The dam construction had definite ecological risk on the aquatic species, especially the endemic fish, in Langcang River, due to the changes of hydrological conditions. The endemic species including Bangia atropurpurea, Lemanea sinica, Prasiola sp., Attheyella yunnanensis, and Neutrodiaptomus mariadvigae were at high ecological risk, and thus, besides monitoring, protection measures were needed to be taken to lower the possibility of the species extinction. The widely distributed species of phytoplankton and zooplankton were at medium ecological risk, and protection measures besides monitoring should be prepared. Twelve kinds of native fish, including Barbodes huangchuchieni, Sinilabeo laticeps, Racoma lantsangensis, Racoma lissolabiatus, Paracobitis anguillioides, Schistura latifasciata, Botia nigrolineata, Vanmanenia striata, Homaloptera yunnanensis, Platytropius longianlis, Glyptothorax zanaensis, and Pseudecheneis immaculate, were at high ecological risk, and protection measures needed to be developed to prevent the possibility of the species loss and extinction.

  10. The trans-Alaska pipeline controversy: Technology, conservation, and the frontier

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coates, P.A.

    1991-01-01

    The Trans-Alaska Pipeline was the object of perhaps the most passionately fought conservation battle in the U.S. Although numerous authors documented the pipeline construction during its construction, there is, surprisingly, no previous scholarly treatment of this event written by an historian. Coates is an environmental historian who views the most interesting aspect of the controversy to be [open quote]its relationship to earlier engineering projects and technological innovations in Alaska and the debates that accompanied them.[close quotes] Thus, he describes how the conservationist and environmental ideas arose during numerous earlier major Alaskan projects and controversies, including the Alaska Highway (1938-41), Canolmore » Pipeline (1943-45), exploration of Naval Petroleum Reserve Number Four (Pet 4, 1944-1953), DEWline (1953-57), oil development in the Kenai National Moose Range (1957-58), statehood (1958), the creation of the Arctic Wildlife Refuge (1960), Project Chariot (1958-63), and Rampart Dam (1959-67). The history starts with the acquisition of Alaska in 1867 and finishes about the time of the Valdez oil spill in 1989.« less

  11. Beyond hydrology in the sustainability assessment of dams: A planners perspective - The Sarawak experience

    NASA Astrophysics Data System (ADS)

    Andre, Edward

    2012-01-01

    SummaryThere is increasing concern about the availability of water supplies in developing countries to provide clean drinking water and sanitation as well as providing for irrigation for food security. This has led to hydrologically led investigation to establish the feasibility and storage capacity of potentially new dam sites. This task has become more difficult for hydrologists and others with the uncertainties created by climate change and the measurement of the hydrological, geographical and ecological footprint of new dams. The questions asked by hydrologists are increasingly likely to be required to be cast in terms of the four pillars of sustainability; environmental, economic, social and institutional. Similarly, regional planners have to be more cognisant of the social outcomes of dam development while understanding the wider hydrological context at a watershed and basin level. The paper defines the concept of sustainability assessment in the context of resettlement and analyses its implications for the Bakun Hydro-electric project in Sarawak, Malaysia. Specifically it attempts to address the question of what social sustainability would really mean in the context of communities affected by dam projects, and their catchments using hermeneutics, tradeoffs and offsets. The findings of this question were presented at a hydrological conference held in Santiago in October 2010, based on the outcome of specific questionnaire responses received from indigenous peoples affected by the Bakun Dam hydroelectric project. The paper also offers some insights pertaining to the social sustainability assessment aspects of dams and their catchments.

  12. Thermal effects of dams in the Willamette River basin, Oregon

    USGS Publications Warehouse

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm

  13. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  14. Little Goose Lock and Dam Removable Spillway Weir

    DTIC Science & Technology

    2007-08-01

    Washington , Idaho Little Goose o i Lower w t i e s LIeG Harbor Granite BonnevilleW L••oh Dma•= SDam John Day S’°~Lwer1 Monumental __ •_]McNary Dam le Dam...passage route for 115 kcfs. 18 NG-1 1 Assemble at Little Goose or Lewiston rather than Portland 19 NG-12 Lower the pool elevation during construction to

  15. Seismic risk assessment for Poiana Uzului (Romania) buttress dam on Uz river

    NASA Astrophysics Data System (ADS)

    Moldovan, Iren-Adelina; Toma-Danila, Dragos; Paerele, Cosmin Marian; Emilian Toader, Victorin; Petruta Constantin, Angela; Ghita, Cristian

    2017-04-01

    The most important specific requirements towards dams' safety is the seismic risk assessment. This objective will be accomplished by rating the dams into seismic risk classes using the theory of Bureau and Ballentine, 2002, and Bureau (2003), taking into account the maximum expected peak ground motions at dams' site, the structures vulnerability and the downstream risk characteristics. The maximum expected values for ground motions at dams' site have been obtained using probabilistic seismic hazard assessment approaches. The structural vulnerability was obtained from dams' characteristics (age, high, water volume) and the downstream risk was assessed using human, economical, touristic, historic and cultural heritage information from the areas that might be flooded in the case of a dam failure. A couple of flooding scenarios have been performed. The results of the work consist of local and regional seismic information, specific characteristics of dam, seismic hazard values for different return periods and risk classes. The studies realized in this paper have as final goal to provide in the near future the local emergency services with warnings of a potential dam failure and ensuing flood as a result of a large earthquake occurrence, allowing further public training for evacuation. Acknowledgments This work was partially supported by the Partnership in Priority Areas Program - PNII, under MEN-UEFISCDI, DARING Project no. 69/2014 and the Nucleu Program - PN 16-35, Project no. 03 01 and 01 06.

  16. How Physical Processes are Informing River Management Actions at Marble Bluff Dam, Truckee River, Nevada

    NASA Astrophysics Data System (ADS)

    Bountry, J.; Godaire, J.; Bradley, D. N.

    2017-12-01

    At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods using historical trends, current field data, and hydraulic and sediment transport models. We present options for adaptive management for dam and reservoir sediment operations that incorporates monitoring of river processes to inform annual implementation strategies along with long-term planning.

  17. 10 CFR 904.5 - Revenue requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the... responsible for the administration of the Colorado River Dam Fund. (b) The electric service revenue of the...(c) of the Adjustment Act and section 1543(c)(2) of the Colorado River Basin Project Act (43 U.S.C...

  18. 78 FR 58535 - Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... license for hydropower development at non-powered dams and closed-loop pumped storage projects in... for licensing hydropower development at non-powered dams and closed-loop pumped storage projects... closed- loop pumped storage) affect the steps included in a two-year process? 3.9 Should there be a...

  19. Preliminary Marine Safety Risk Assessment, Brandon Road Lock and Dam Invasive Species Control Measures

    DTIC Science & Technology

    2016-12-01

    i Classification | CG-926 RDC | author | audience | month year Preliminary Marine Safety Risk Assessment, Brandon Road Lock & Dam...No. 4. Title and Subtitle Preliminary Marine Safety Risk Assessment, Brandon Road Lock & Dam Invasive Species Control Measures 5. Report Date...safety due to proposed invasive species control measures located in the vicinity of the Brandon Road Lock and Dam (BRLD) Navigation Project on the

  20. Structural safety evaluation of Gerber Arch Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barrie, R.E.

    1995-12-31

    Gerber Dam, a variable radius arch structure, has experienced seepage and extensive freeze-thaw damage since its construction. A construction key was found cracked at its crest. A finite element investigation was made to evaluate the safety of the arch structure. Design methods and assumptions are evaluated. Historical performance is used in the evaluation. Stress levels, patterns, and distributions were evaluated for loads the structure has experienced to determine behavior contributing to seepage and cracking.

  1. What tools do we have to study the morphological effects of hydroelectric plants in developing countries? The Chilean case

    NASA Astrophysics Data System (ADS)

    Alcayaga, Hernan; Caamaño, Diego; Palma, Sebastian; Contreras, Karla

    2017-04-01

    Countries growing rates are directly related to energy production. Therefore, developed and developing nations are focused on hydropower and dam construction; on the contrary dam removal practices are significantly different among nations, demonstrating the former group a lesser interest on removing structures. Chiles hydropower generation corresponds to 50% of the current grid, having a potential capacity to double the current situation. Thus: ¿What tools can we apply to assess the potential impacts on our rivers? The goal of this project is to study two different reaches located in two separates streams in Central Chile. The Aconcagua River represents a mountain stream (i.e. steep, narrow, and confined) subject to the operation of a hydroelectric system composed by five diversion hydropower plants built during the 90`s. The Rapel River reach corresponds to the last 10km upstream to the outlet; it is a mild and wide stream that includes the gravel-sand transition. The Rapel dam operates about 25km upstream this second reach that is characterized by an 112m wall built in 1968. The Aconcagua hydropower system was characterized within a GIS environment and a morphological response conceptual model applied. The model uses two indexes to evaluate changes in i) channel forming discharge and ii) sediment supply. The provided response shows the trends and magnitudes of the changes, based in eighth possible directions for ten morphological responsible variables. The Rapel river system was evaluated differently and sampling of sediments characteristics (D50 and armour index), discharge index for both before and after the dam operation, Morphological Quality Index (IQM) and an analysis of aerial photography time series were performed. Results showed that the hydrology indicator impacts for the Aconcagua system were more severe than the impacts on sediments transport (typically the case for diversion type hydropower). A fine armour layer was found within the Rapel river site, also the IQM method classified it as poor quality, and the analysis of aerial photos showed three areas with significant changes in sinuosity. Although, both reaches indicated aggradation, attenuation in width, and an increment in slope. The amount and the quality of the available data on both reaches allowed assessing the basic morphological changes for the current rivers morphological stage. The next step is to transfer these methods and results to other systems that lack of these level of information, thus we could somehow diagnose and quantify impacts before the construction of the structure, and not as it is done today that impacts are not corrected within the project, but mitigated once the dam is in place and operating.

  2. Design of converging stepped spillways

    USDA-ARS?s Scientific Manuscript database

    Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Unobtainable land rights, topographic features, and land use changes caused by ...

  3. Model Projections of Future Fluvial Sediment Delivery to Major Deltas Under Environmental Change

    NASA Astrophysics Data System (ADS)

    Darby, S. E.; Dunn, F.; Nicholls, R. J.; Cohen, S.; Zarfl, C.

    2017-12-01

    Deltas are important hot spots for climate change impacts on which over half a billion people live worldwide. Most of the world's deltas are sinking as a result of natural and anthropogenic subsidence and due to eustatic sea level rise. The ability to predict rates of delta aggradation is therefore critical to assessments of the extent to which sedimentation can potentially offset sea level rise, but our ability to make such predictions is severely hindered by a lack of insight into future trends of the fluvial sediment load supplied to their deltas by feeder watersheds. To address this gap we investigate fluvial sediment fluxes under future environmental change for a selection (47) of the world's major river deltas. Specifically, we employed the numerical model WBMsed to project future variations in mean annual fluvial sediment loads under a range of environmental change scenarios that account for changes in climate, socio-economics and dam construction. Our projections indicate a clear decrease (by 34 to 41% on average, depending on the specific scenario) in future fluvial sediment supply to most of the 47 deltas. These reductions in sediment delivery are driven primarily by anthropogenic disturbances, with reservoir construction being the most influential factor globally. Our results indicate the importance of developing new management strategies for reservoir construction and operation.

  4. 1000 dams down and counting

    USGS Publications Warehouse

    O'Connor, James E.; Duda, Jeff J.; Grant, Gordon E.

    2015-01-01

    Forty years ago, the demolition of large dams was mostly fiction, notably plotted in Edward Abbey's novel The Monkey Wrench Gang. Its 1975 publication roughly coincided with the end of large-dam construction in the United States. Since then, dams have been taken down in increasing numbers as they have filled with sediment, become unsafe or inefficient, or otherwise outlived their usefulness (1) (see the figure, panel A). Last year's removals of the 64-m-high Glines Canyon Dam and the 32-m-high Elwha Dam in northwestern Washington State were among the largest yet, releasing over 10 million cubic meters of stored sediment. Published studies conducted in conjunction with about 100 U.S. dam removals and at least 26 removals outside the United States are now providing detailed insights into how rivers respond (2, 3).

  5. Bed Degradation and Sediment Export from the Missouri River after Dam Construction and River Training: Significance to Lower Mississippi River Sediment Loads

    NASA Astrophysics Data System (ADS)

    Blum, M. D.; Viparelli, E.; Sulaiman, Z. A.; Pettit, B. S.

    2016-12-01

    More than 40,000 dams have been constructed in the Mississippi River drainage basin, which has had a dramatic impact on suspended sediment load for the Mississippi delta. The most significant dams were constructed in the 1950s on the Missouri River in South Dakota, after which total suspended loads for the lower Mississippi River, some 2500 km downstream, were cut in half: gauging station data from the Missouri-Mississippi system show significant load reductions immediately after dam closure, followed by a continued downward trend since that time. The delta region is experiencing tremendous land loss in response to acceleration of global sea-level rise, and load reductions of this magnitude may place severe limits on mitigation efforts. Here we examine sediment export from the Missouri system due to bed scour. The US Army Corps of Engineers has compiled changes in river stage at constant discharge for 8 stations between the lowermost dam at Yankton, South Dakota and the Missouri-Mississippi confluence at St. Louis (a distance of 1250 river km), for the period 1930-2010, which we have updated to 2015. These data show two general reaches of significant bed degradation. The first extends from the last major dam at Yankton, South Dakota downstream 300 km to Omaha, Nebraska, where degradation in response to the dam exceeds 3 m. The second reach, with >2.5 m of degradation, occurs in and around Kansas City, Missouri, and has been attributed to river training activities. The reach between Omaha and Kansas City, as well as the lower Missouri below Kansas City, show <1 m of net bed elevation change over the entire 75-year period of record. Integrating bed elevation changes over the period of record, we estimate a total of 1.1-1.2 billion tons of sediment have been exported from the Missouri River due to bed scour following dam construction and river training. This number equates to 20-25 million tons per year, which is sufficient to account for 30% of the total Missouri River load, and 15% of the total post-dam annual sediment load for the lower Mississippi River. For perspective, the quantity of sediment exported from the Missouri River due to bed scour is greater than the total load for all rivers in the US lower 48 states, except the Mississippi and Colorado Rivers, and would rank in the top 50 of all rivers in the modern world.

  6. The design of the intelligent monitoring system for dam safety

    NASA Astrophysics Data System (ADS)

    Yuan, Chun-qiao; Jiang, Chen-guang; Wang, Guo-hui

    2008-12-01

    Being a vital manmade water-control structure, a dam plays a very important role in the living and production of human being. To make a dam run safely, the best design and the superior construction quality are paramount; moreover, with working periods increasing, various dynamic, alternative and bad loads generate little by little various distortions on the dam structure inevitably, which shall lead to potential safety problems or further a disaster (dam burst). There are many signs before the occurrence of a dam accident, so the timely and effective surveying on the distortion of a dam is important. On the basis of the cause supra, two intelligent (automatic) monitoring systems about the dam's safety based on the RTK-GPS technology and the measuring robot has been developed. The basic principle, monitoring method and monitoring process of these two intelligent (automatic) monitoring systems are introduced. It presents examples of monitor and puts forward the basic rule of dam warning based on data of actual monitor.

  7. National Dam Safety Program. Ursel Gingerich Dam (MO 10393), Mississippi - Salt - Quincy River Basin, Schuyler County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1979-12-01

    34 which identifies the program element, project, task area, and work unit or equivalent under which the work was authorized. Block 11. Controlling ...Dam Inventory and Inspection Section, LMSED-PD ULSF 210 Tucker Blvd., North, St. Louis, Mo. 63101D C O 11. CONTROLLING OFFICE NAME AND ADDRESS 12m...under the National Program of Inspection of Non -Federal Dams. This report assesses the general condition of the dam with a respect to safety, based on

  8. Rock Mass Classification of Karstic Terrain in the Reservoir Slopes of Tekeze Hydropower Project

    NASA Astrophysics Data System (ADS)

    Hailemariam Gugsa, Trufat; Schneider, Jean Friedrich

    2010-05-01

    Hydropower reservoirs in deep gorges usually experience slope failures and mass movements. History also showed that some of these projects suffered severe landslides, which left lots of victims and enormous economic loss. Thus, it became vital to make substantial slope stability studies in such reservoirs to ensure safe project development. This study also presents a regional scale instability assessment of the Tekeze Hydropower reservoir slopes. Tekeze hydropower project is a newly constructed double arch dam that completed in August 2009. It is developed on Tekeze River, tributary of Blue Nile River that runs across the northern highlands of Ethiopia. It cuts a savage gorge 2000m deep, the deepest canyon in Africa. The dam is the highest dam in Ethiopia at 188m, 10 m higher than China's Three Gorges Dam. It is being developed by Chinese company at a cost of US350M. The reservoir is designed at 1140 m elevation, as retention level to store more than 9000 million m3 volume of water that covers an area of 150 km2, mainly in channel filling form. In this study, generation of digital elevation model from ASTER satellite imagery and surface field investigation is initially considered for further image processing and terrain parameters' analyses. Digitally processed multi spectral ASTER ortho-images drape over the DEM are used to have different three dimensional perspective views in interpreting lithological, structural and geomorphological features, which are later verified by field mapping. Terrain slopes are also delineated from the relief scene. A GIS database is ultimately developed to facilitate the delineation of geotechnical units for slope rock mass classification. Accordingly, 83 geotechnical units are delineated and, within them, 240 measurement points are established to quantify in-situ geotechnical parameters. Due to geotechnical uncertainties, four classification systems; namely geomorphic rock mass strength classification (RMS), slope mass rating (SMR), rock slope stability probability classification (SSPC) and geological strength index (GSI) are employed to classify the rock mass. The results are further compared with one another to delineate the instability conditions and produce an instability map of the reservoir slopes. Instability of the reservoir slopes is found to be mainly associated with daylighting discontinuities, thinly bedded/foliated slates, and karstified limestone. It is also noted that these features are mostly located in the regional gliding plane and shear zone, which are related with old slides scars. In general, the instabilities are found relatively far from the dam axis, in relatively less elevated and less steep slopes, which are going to be nearly covered by the impoundment; thus, they are normally expected to have less hazard in relation to the reservoir setting. Some minor failures will be generally expected during the reservoir filling.

  9. Risk Perception Analysis Related To Existing Dams In Italy

    NASA Astrophysics Data System (ADS)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.

  10. Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuehn, Douglas; Berger, Matthew

    1992-01-01

    Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.

  11. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 9, Tracks 9-11

    DTIC Science & Technology

    2005-08-04

    Walls ETL 1110-2-563, by John D. Clarkson and Robert C. Patev Belleville Locks & Dam Barge Accident on 6 Jan 05, by John Clarkson Portugues Dam Project...Update, by Alberto Gonzalez, Jim Mangold and Dave Dollar Portugues Dam: RCC Materials Investigation, by Jim Hinds Nonlinear Incremental Thermal Stress...Strain Analysis Portugues Dam, by David Dollar, Ahmed Nisar, Paul Jacob and Charles Logie Seismic Isolation of Mission-Critical Infrastructure to

  12. Asian river fishes in the Anthropocene: threats and conservation challenges in an era of rapid environmental change.

    PubMed

    Dudgeon, D

    2011-12-01

    This review compares and contrasts the environmental changes that have influenced, or will influence, fishes and fisheries in the Yangtze and Mekong Rivers. These two rivers have been chosen because they differ markedly in the type and intensity of prevailing threats. The Mekong is relatively pristine, whereas the Three Gorges Dam on the Yangtze is the world's largest dam representing the apotheosis of environmental alteration of Asian rivers thus far. Moreover, it is situated at the foot of a planned cascade of at least 12 new dams on the upper Yangtze. Anthropogenic effects of dams and pollution of Yangtze fishes will be exacerbated by plans to divert water northwards along three transfer routes, in part to supplement the flow of the Yellow River. Adaptation to climate change will undoubtedly stimulate more dam construction and flow regulation, potentially causing perfect storm conditions for fishes in the Yangtze. China has already built dams along the upper course of the Mekong, and there are plans for as many as 11 mainstream dams in People's Democratic Republic (Laos) and Cambodia in the lower Mekong Basin. If built, they could have profound consequences for biodiversity, fisheries and human livelihoods, and such concerns have stalled dam construction. Potential effects of dams proposed for other rivers (such as Nujiang-Salween) are also cause for concern. Conservation or restoration measures to sustain some semblance of the rich fish biodiversity of Asian rivers can be identified, but their implementation may prove problematic in a context of increasing Anthropocene alteration of these ecosystems. © 2011 The Author. Journal of Fish Biology © 2011 The Fisheries Society of the British Isles.

  13. An assessment of fish assemblage structure in a large river

    USGS Publications Warehouse

    Kiraly, Ian A.; Coghlan, S.M.; Zydlewski, Joseph D.; Hayes, D.

    2015-01-01

    The Penobscot River drains the largest watershed in Maine and once provided spawning and rearing habitats to 11 species of diadromous fishes. The construction of dams blocked migrations of these fishes and likely changed the structure and function of fish assemblages throughout the river. The proposed removal of two main-stem dams, improved upstream fish passage at a third dam, and construction of a fish bypass on a dam obstructing a major tributary is anticipated to increase passage of and improve habitat connectivity for both diadromous and resident fishes. We captured 61 837 fish of 35 species in the Penobscot River and major tributaries, through 114 km of boat electrofishing. Patterns of fish assemblage structure did not change considerably during our sampling; relatively few species contributed to seasonal and annual variability within the main-stem river, including smallmouth bass Micropterus dolomieu, white sucker Catostomus commersonii, pumpkinseed Lepomis gibbosus, and golden shiner Notemigonus crysoleucas. However, distinct fish assemblages were present among river sections bounded by dams. Many diadromous species were restricted to tidal waters downriver of the Veazie Dam; Fundulus species were also abundant within the tidal river section. Smallmouth bass and pumpkinseed were most prevalent within the Veazie Dam impoundment and the free-flowing river section immediately upriver, suggesting the importance of both types of habitat that supports multiple life stages of these species. Further upriver, brown bullhead Ameiurus nebulosus, yellow perch Perca flavescens, chain pickerel Esox niger, and cyprinid species were more prevalent than within any other river section. Our findings describe baseline spatial patterns of fish assemblages in the Penobscot River in relation to dams with which to compare assessments after dam removal occurs.

  14. 78 FR 6321 - Stephen Phillips, Brentwood Dam Ventures, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4254-009] Stephen Phillips, Brentwood Dam Ventures, LLC; Notice of Transfer of Exemption 1. By letter filed May 31, 2006 and supplemented on January 15, 2013, Stephen Phillips and Brentwood Dam Ventures, LLC informed the Commission that...

  15. 78 FR 70295 - Intent to Prepare an Environmental Impact Statement for the Dam Safety Modification Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... of the dam not designed to be overtopped. After a full consideration of alternatives, this... for the DSA project permitting the Huntington District to begin detailed design and [[Page 70296... concrete blocks placed against the downstream face of the dam, and a pavement for scour protection...

  16. River on Trial

    ERIC Educational Resources Information Center

    Carney, Thomas R.

    1972-01-01

    Presents controversy over damming of Wyoming's Upper Green River to supply water to the arid basins of eastern Wyoming. Possibilities of wildlife destruction, flooding of valley lands, and opposition to the construction of the Kendall Dam itself are enumerated together with legislative action to date. (BL)

  17. Converging stepped spillways: Simplified momentum analysis approach

    USDA-ARS?s Scientific Manuscript database

    Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Site conditions, such as limited right-of-way, topography, and geological forma...

  18. 77 FR 62224 - Notice of Intent To Revise Scope of Draft Environmental Impact Statement for Updating the Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Industrial Water Supply From the Buford Dam/Lake Lanier Project AGENCY: Department of the Army, U.S. Army... accommodate municipal and industrial water supply from the Buford Dam/Lake Lanier project. The Corps is... also consider, along with operations for all authorized purposes, an expanded range of water supply...

  19. 75 FR 33290 - City of Broken Bow, OK; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... application for an Original Major License for the Broken Bow Re-Regulation Dam Hydropower Project. The project would be located at the United States Army Corps of Engineers' (Corps) Broken Bow Re-Regulation Dam on... http://www.ferc.gov , using the ``eLibrary'' link. Enter the docket number excluding the last three...

  20. Spokane Tribal Hatchery, 2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.

    2006-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting harvestable fisheries for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). The Spokane Tribe, Washington Department of Fish and Wildlife, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Projectmore » are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area. The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and Lake Roosevelt Rainbow Trout Net Pen Rearing Projects. The Lake Roosevelt and Banks Lake Fisheries Evaluation Program monitor and evaluates release strategies and production methods for the aforementioned projects. Between 1985 and 2005 the projects have collectively produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 1.4 million kokanee fry for Banks Lake annually. In 2005, the annual release goal included 3.3 million kokanee fry, 475,000 kokanee yearlings and 500,000 rainbow trout yearlings. Fish produced by this project in 2005 to meet collective fish production and release goals included: 3,446,438 kokanee fingerlings, 347,730 rainbow trout fingerlings and 525,721 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Meadow Creek and Lake Whatcom kokanee, diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to rainbow trout catch and harvest rates while the impact on the kokanee fishery was minimal. Success of the Lake Roosevelt kokanee artificial production program appears to be limited primarily owing to predation, precocity and high entrainment rates through Grand Coulee Dam. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue kokanee fry and post-smolt releases, 100% triploid hatchery stock rainbow trout used and adipose fin clip hatchery stock rainbow trout prior to release. The Spokane Tribal Hatchery is funded by the Bonneville Power Administration under directives by the Northwest Power Conservation Council Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.« less

  1. A retrospective view of the quality of the fauna component of the Olympic Dam Project Environmental Impact Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Read, J.L.

    1994-06-01

    The merits of the fauna section of the Olympic Dam Project Environmental Impact Statement (EIS) are discussed. The values of different survey methods and monitoring organisms used in this document are evaluated following 10 years of fauna monitoring and research subsequent to the preparation of the EIS. The pilot fauna reconnaissance was found to be of little value, although the associated literature review formed an integral part of the EIS. Over 95% of all amphibian, reptile and bird species recorded at Olympic Dam were confirmed or predicted to occur in the EIS. Mammal predictions were less accurate because of themore » sparse populations and irruptive nature of several arid-zone species. Prediction and monitoring of rare species were demonstrably difficult. The Olympic Dam Project EIS was found in general to be an accurate and useful document. However, it is suggested that more emphasis be placed on establishing monitoring programmes for future EISs, particularly for invertebrates. 35 refs., 1 fig., 3 tabs.« less

  2. Variable-intercept panel model for deformation zoning of a super-high arch dam.

    PubMed

    Shi, Zhongwen; Gu, Chongshi; Qin, Dong

    2016-01-01

    This study determines dam deformation similarity indexes based on an analysis of deformation zoning features and panel data clustering theory, with comprehensive consideration to the actual deformation law of super-high arch dams and the spatial-temporal features of dam deformation. Measurement methods of these indexes are studied. Based on the established deformation similarity criteria, the principle used to determine the number of dam deformation zones is constructed through entropy weight method. This study proposes the deformation zoning method for super-high arch dams and the implementation steps, analyzes the effect of special influencing factors of different dam zones on the deformation, introduces dummy variables that represent the special effect of dam deformation, and establishes a variable-intercept panel model for deformation zoning of super-high arch dams. Based on different patterns of the special effect in the variable-intercept panel model, two panel analysis models were established to monitor fixed and random effects of dam deformation. Hausman test method of model selection and model effectiveness assessment method are discussed. Finally, the effectiveness of established models is verified through a case study.

  3. Sedimentation Survey of Lago Toa Vaca, Puerto Rico, June-July 2002

    USGS Publications Warehouse

    Soler-López, Luis R.

    2004-01-01

    The Lago Toa Vaca dam is located in the municipality of Villalba in southern Puerto Rico, and is owned and operated by the Puerto Rico Aqueduct and Sewer Authority. Construction was completed in 1972 as the first phase of a multi-purpose project that contemplated four possible diversions from other basins to mitigate the rapid storage capacity loss of Lago Guayabal, located immediately downstream of the Toa Vaca dam. The latter phases of the intra-basin diversions were cancelled, and currently, the reservoir receives runoff from only 56.8 square kilometers of its drainage area. Lago Toa Vaca reservoir when constructed was to be used for irrigation of croplands in the southern coastal plain. The reservoir had an original storage capacity of 68.94 million cubic meters. Sedimentation has reduced the storage capacity by only 7 percent between 1972 and 2002 to 64.08 million cubic meters. This represents a long-term sedimentation rate of about 162,000 cubic meters per year. Based on the 2002 sedimentation survey, Lago Toa Vaca has a sediment trapping efficiency of about 98 percent and a drainage area-normalized sedimentation rate of about 3,086 cubic meters per square kilometer per year between 1972 and 2002. At the current long-term sedimentation rate the reservoir would lose its storage capacity by the year 2400.

  4. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    USGS Publications Warehouse

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  5. Entiat 4Mile WELLs Completion Report, 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malinowksi, Richard

    2007-01-01

    The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen overmore » a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).« less

  6. Impact of Watershed Development on Sediment Transport and Seasonal Flooding in the Main Stream of the Mekong River

    NASA Astrophysics Data System (ADS)

    Kameyama, S.; Nohara, S.; Sato, T.; Fujii, Y.; Kudo, K.

    2009-12-01

    The Mekong River watershed is undergoing rapid economic progress and population growth, raising conflicts between watershed development and environmental conservation. A typical conflict is between the benefits of dam construction versus the benefits of watershed ecological services. In developed countries, this conflict is changing to a coordinated search for outcomes that are mutually acceptable to all stakeholders. In the Mekong River, however, government policy gives priority to watershed development for ensuring steady energy supplies. Since the 1990s, a series of dams called “the Mekong Cascade” have been under construction. Dam construction has multiple economic values as electric power supply, irrigation water, flood control, etc. On the other hand, the artificial flow discharge controls of dam moderate seasonal hydrologic patterns of the Asian monsoon region. Dam operations can change the sediment transport regime and river structure. Furthermore, their impacts on watershed ecosystems and traditional economic activities of fisheries and agriculture in downstream areas may be severe. We focus on dam impacts on spatio-temporal patterns of sediment transport and seasonal flood in riparian areas downstream from Mekong River dams. Our study river section is located on 100 km down stream from the Golden Triangle region of Myanmar, Laos, and Thailand. We selected a 10-km section in this main channel to simulate seasonal flooding. We modeled the river hydrology in the years 1991 and 2002, before and after the Manwan dam construction (1986-1993). For this simulation, we adapted three models (distributed runoff model, 1-D hydrological model, and 2-D flood simulation with sediment movement algorithm.) Input data on river structure, water velocity, and flow volume were acquired from field survey data in November 2007 and 2008. In the step of parameter decision, we adopted the shuffled complex evolution method. To validate hydrologic parameters, we used annual water level data observed in Chiang Sean and Luang Prabang. To calculate sediment flux volume, we employed a Load-Quantity equation using total suspended solids data from monthly water sampling and flow discharge volumes over 13 months. To evaluate the impact of dam construction and watershed development, we inputted the same year of precipitation data using two watershed conditions with different parameters. Our results from the 1-D model displayed a seasonal delay of water flooding time after summer rainy season and an increase in sediment transport volume from September to October. In the flood simulation by the 2-D model, most of the annual sediment transport was concentrated from July to October. The spatial pattern of sediment dynamics was dependent largely on river structure including river meander shape, river bottom elevation, and geometry of the riparian zone. Our study approaches and simulation results show promise for beginning a quantitative assessment approach to cross-boundary environmental issues in the Mekong River watershed.

  7. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    NASA Astrophysics Data System (ADS)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  8. Disasters as a necessary part of benefit-cost analyses.

    PubMed

    Mark, R K; Stuart-Alexander, D E

    1977-09-16

    Benefit-cost analyses for water projects generally have not included the expected costs (residual risk) of low-probability disasters such as dam failures, impoundment-induced earthquakes, and landslides. Analysis of the history of these types of events demonstrates that dam failures are not uncommon and that the probability of a reservoir-triggered earth-quake increases with increasing reservoir depth. Because the expected costs from such events can be significant and risk is project-specific, estimates should be made for each project. The cost of expected damage from a "high-risk" project in an urban area could be comparable to project benefits.

  9. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 11, Tracks 13 and 14

    DTIC Science & Technology

    2005-08-04

    Walls ETL 1110-2-563, by John D. Clarkson and Robert C. Patev Belleville Locks & Dam Barge Accident on 6 Jan 05, by John Clarkson Portugues Dam Project...Update, by Alberto Gonzalez, Jim Mangold and Dave Dollar Portugues Dam: RCC Materials Investigation, by Jim Hinds Nonlinear Incremental Thermal Stress...Strain Analysis Portugues Dam, by David Dollar, Ahmed Nisar, Paul Jacob and Charles Logie Seismic Isolation of Mission-Critical Infrastructure to

  10. Harnessing Alaska. [Hydroelectric power in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Four hydropower projects will provide electricity for isolated Alaskan cities by late 1984. A 15Mw project is already producing power. The three remaining hydro projects are described. Tyee Lake is a lake tap project. Water is supplied to the powerhouse by tapping the lake via a tunnel blasted through the lake bottom. Water then flows through a vertical pressure shaft to a power tunnel and into an aboveground powerhouse. Swan Lake consists of a double-curved arch dam and a power tunnel. Terror Lake consists of a concrete-faced compacted rockfill dam and a power tunnel.

  11. 77 FR 37668 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... feasibility of the proposed Coralville Dam Hydroelectric Project No. 14388, to be located at the existing Coralville Dam on the Iowa River, near Iowa City in Johnson County, Iowa. The Coralville Dam is owned by the... Competing Applications; Coralville Energy, LLC On April 18, 2012, the Coralville Energy, LLC filed an...

  12. 9. 'CRIB DAM IN LAKE FORK RIVER AT HEADING OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. 'CRIB DAM IN LAKE FORK RIVER AT HEADING OF LAKE FORK CANAL, UINTAH PROJECT. TWO SLUICEWAYS TWENTY FEET WIDE HAVE BEEN LEFT IN THE DAM TO PASS BOULDERS DURING HIGH WATER. THESE SLUICEWAYS ARE CLOSED BY LOGS AND HAY DURING LOW WATER.' Date unknown - Irrigation Canals in the Uinta Basin, Duchesne, Duchesne County, UT

  13. Recovery of sockeye salmon in the Elwha River, Washington, after dam removal: Dependence of smolt production on the resumption of anadromy by landlocked kokanee

    USGS Publications Warehouse

    Hansen, Adam G.; Gardner, Jennifer R.; Beauchamp, David A.; Paradis, Rebecca; Quinn, Thomas P.

    2016-01-01

    Pacific salmon Oncorhynchus spp. are adept at colonizing habitat that has been reopened to anadromous passage. Sockeye Salmon O. nerka are unique in that most populations require lakes to fulfill their life history. Thus, for Sockeye Salmon to colonize a system, projects like dam removals must provide access to lakes. However, if the lakes contain landlocked kokanee (lacustrine Sockeye Salmon), the recovery of Sockeye Salmon could be mediated by interactions between the two life history forms and the processes associated with the resumption of anadromy. Our objective was to evaluate the extent to which estimates of Sockeye Salmon smolt production and recovery are sensitive to the resumption of anadromy by kokanee after dam removal. We informed the analysis based on the abiotic and biotic features of Lake Sutherland, which was recently opened to passage after dam removal on the Elwha River, Washington. We first developed maximum expectations for the smolt-producing capacity of Lake Sutherland by using two predictive models developed from Sockeye Salmon populations in Alaska and British Columbia: one model was based on the mean seasonal biomass of macrozooplankton, and the other was based on the euphotic zone volume of the lake. We then constructed a bioenergetics-based simulation model to evaluate how the capacity of Lake Sutherland to rear yearling smolts could change with varying degrees of anadromy among O. nerka fry. We demonstrated that (1) the smolt-producing capacity of a nursery lake for juvenile Sockeye Salmon changes in nonlinear ways with changes in smolt growth, mortality, and the extent to which kokanee resume anadromy after dam removal; (2) kokanee populations may be robust to changes in abundance after dam removal, particularly if lakes are located higher in the watershed on tributaries separate from where dams were removed; and (3) the productivity of newly establishing Sockeye Salmon can vary considerably depending on whether the population becomes rearing limited or is recruitment limited and depending on how adult escapement is managed.

  14. Quantifying Riverscape Connectivity with Graph Theory

    NASA Astrophysics Data System (ADS)

    Carbonneau, P.; Milledge, D.; Sinha, R.; Tandon, S. K.

    2013-12-01

    Fluvial catchments convey fluxes of water, sediment, nutrients and aquatic biota. At continental scales, crustal topography defines the overall path of channels whilst at local scales depositional and/or erosional features generally determine the exact path of a channel. Furthermore, constructions such as dams, for either water abstraction or hydropower, often have a significant impact on channel networks.The concept of ';connectivity' is commonly invoked when conceptualising the structure of a river network.This concept is easy to grasp but there have been uneven efforts across the environmental sciences to actually quantify connectivity. Currently there have only been a few studies reporting quantitative indices of connectivity in river sciences, notably, in the study of avulsion processes. However, the majority of current work describing some form of environmental connectivity in a quantitative manner is in the field of landscape ecology. Driven by the need to quantify habitat fragmentation, landscape ecologists have returned to graph theory. Within this formal setting, landscape ecologists have successfully developed a range of indices which can model connectivity loss. Such formal connectivity metrics are currently needed for a range of applications in fluvial sciences. One of the most urgent needs relates to dam construction. In the developed world, hydropower development has generally slowed and in many countries, dams are actually being removed. However, this is not the case in the developing world where hydropower is seen as a key element to low-emissions power-security. For example, several dam projects are envisaged in Himalayan catchments in the next 2 decades. This region is already under severe pressure from climate change and urbanisation, and a better understanding of the network fragmentation which can be expected in this system is urgently needed. In this paper, we apply and adapt connectivity metrics from landscape ecology. We then examine the connectivity structure of the Gangetic riverscape with fluvial remote sensing. Our study reach extends from the heavily dammed headwaters of the Bhagirathi, Mandakini and Alaknanda rivers which form the source of the Ganga to Allahabad ~900 km downstream on the main stem. We use Landsat-8 imagery as the baseline dataset. Channel width along the Ganga (i.e. Ganges) is often several kilometres. Therefore, the pan-sharpened 15m pixels of Landsat-8 are in fact capable of resolving inner channel features for over 80% of the channel length thus allowing a riverscape approach to be adopted. We examine the following connectivity metrics: size distribution of connected components, betweeness centrality and the integrated index of connectivity. A geographic perspective is added by mapping local (25 km-scale) values for these metrics in order to examine spatial patterns of connectivity. This approach allows us to map impacts of dam construction and has the potential to inform policy decisions in the area as well as open-up new avenues of investigation.

  15. Geophysical Investigation using Two Dimensional Electrical Resistivity Tomography method to delineate Subsurface Geological Structures at Dudhkoshi-II (230 MW) Hydroelectric Project, Solukhumbu District, Eastern Nepal

    NASA Astrophysics Data System (ADS)

    Ghimire, H.; Bhusal, U. C.; Khatiwada, B.; Pandey, D.

    2017-12-01

    Geophysical investigation using two dimensional electrical resistivity tomography (2D-ERT) method plays a significant role in determining the subsurface resistivity distribution by making measurement on the ground surface. This method was carried out at Dudhkoshi-II (230 MW) Hydroelectric Project, lies on Lesser Himalayan region of the Eastern Nepal to delineate the nature of the subsurface geology to assess its suitability for the construction of dam, desanding basin and powerhouse. The main objective of the proposed study consists of mapping vertical as well as horizontal variations of electrical resistivity to enable detection of the boundaries between unconsolidated materials and rocks of the different resistivity, possible geologic structures, such as possible presence of faults, fractures, and voids in intake and powerhouse area. For this purpose, the (WDJD-4 Multi-function Digital DC Resistivity/IP) equipment was used with Wenner array (60 electrodes). To fulfill these objectives of the study, the site area was mapped by Nine ERT profiles with different profile length and space between electrodes was 5 m. The depth of the investigation was 50 m. The acquired data were inverted to tomogram sections using tomographic inversion with RES2DINV commercial software. The Tomography sections show that the subsurface is classified into distinct geo-electric layers of dry unconsolidated overburden, saturated overburden, fractured rock and fresh bedrock of phyllites with quartzite and gneiss with different resistivity values. There were no voids and faults in the study area. Thickness of overburden at different region found to be different. Most of the survey area has bedrock of phyllites with quartzite; gneiss is also present in some location at intake area. Bedrock is found at the varies depth of 5-8 m at dam axis, 20-32 m at desanding basin and 3-10 m at powerhouse area. These results are confirmed and verified by using several boreholes data were drilled on the survey area. The results obtained from the study showed that the site is suitable for the construction of the proposed dam, desanding basin and powerhouse.

  16. Modelling the impact of large dams on flows and hydropower production of the Sekong, Sesan and Srepok Rivers in the Mekong Basin

    NASA Astrophysics Data System (ADS)

    Piman, T.; Cochrane, T. A.; Arias, M. E.

    2013-12-01

    Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.

  17. Coastal change from a massive sediment input: Dam removal, Elwha River, Washington, USA

    USGS Publications Warehouse

    Warrick, Jonathan A.; Gelfenbaum, Guy R.; Stevens, Andrew; Miller, Ian M.; Kaminsky, George M.; Foley, Melissa M.

    2015-01-01

    The removal of two large dams on the Elwha River, Washington, provides an ideal opportunity to study coastal morphodynamics during increased sediment supply. The dam removal project exposed ~21 million cubic meters (~30 million tonnes) of sediment in the former reservoirs, and this sediment was allowed to erode by natural river processes. Elevated rates of sand and gravel sediment transport in the river occurred during dam removal. Most of the sediment was transported to the coast, and this renewed sediment supply resulted in hundreds of meters of seaward expansion of the river delta since 2011. Our most recent survey in January 2015 revealed that a cumulative ~3.5 million m3 of sediment deposition occurred at the delta since the beginning of the dam removal project, and that aggradation had exceeded 8 m near the river mouth. Some of the newly deposited sediment has been shaped by waves and currents into a series of subaerial berms that appear to move shoreward with time.

  18. 77 FR 21095 - UEK Delaware L.P.; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... Indian River in Sussex County, Delaware. The United States Army Corps of Engineers designed, built, and... project uses no dam or impoundment. The proposed project would consist of: (1) Twenty-five 122-inches-tall... water or water power from a government dam; or (4) if applicable, has involved or would involve any...

  19. 76 FR 63294 - River Bounty, Inc.; Notice of Termination of Exemption By Implied Surrender and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... powerhouse containing three units. Currently, there is a 50- to 60-foot-wide breach in the dam. The project... the Oakland Project because it lost its power sales contract. Since that time, the powerhouse..., the breach expanded leaving a 50- to 60-foot- wide opening in the dam. In April 2011, the Commission...

  20. 76 FR 70440 - Haiwee Ridge Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... South Haiwee reservoir, near the town of Olancha, Inyo County, California. The project would affect... (Alternatives A and B) would consist of the existing South Haiwee dam. The dam has operations limited due to... the water level in the reservoir is limited to a maximum elevation of 3,742 feet msl. The applicant is...

  1. Evaluating the effects of check dams on channel geometry, bed sediment size and riparian vegetation in Mediterranean mountain torrents.

    PubMed

    Zema, Demetrio Antonio; Bombino, Giuseppe; Denisi, Pietro; Lucas-Borja, Manuel Esteban; Zimbone, Santo Marcello

    2018-06-12

    In mountain streams possible negative impacts of check dams on soil, water and riparian vegetation due to check dam installation can be noticed. In spite of the ample literature on the qualitative effects of engineering works on channel hydrology, morphology, sedimentary effects and riparian vegetation characteristics, quantitative evaluations of the changes induced by check dams on headwater characteristics are rare. In order to fill this gap, this study has evaluated the effects of check dams located in headwaters of Calabria (Southern Italy) on hydrological and geomorphological processes and on the response of riparian vegetation to these actions. The analysis has compared physical and vegetation indicators in transects identified around check dams (upstream and downstream) and far from their direct influence (control transects). Check dams were found to influence significantly unit discharge, surface and subsurface sediments (both upstream and downstream), channel shape and transverse distribution of riparian vegetation (upstream) as well as cover and structure of riparian complexes (downstream). The actions of the structures on torrent longitudinal slope and biodiversity of vegetation were less significant. The differences on bed profile slope were significant only between upstream and downstream transects. The results of the Agglomerative Hierarchical Cluster analysis confirmed the substantial similarity between upstream and control transects, thus highlighting that the construction of check dams, needed to mitigate the hydro-geological risks, has not strongly influenced the torrent functioning and ecology before check dam construction. Moreover, simple and quantitative linkages between torrent hydraulics, geomorphology and vegetation characteristics exist in the analysed headwaters; these relationships among physical adjustments of channels and most of the resulting characteristics of the riparian vegetation are specific for the transect locations with respect of check dams. Conversely, the biodiversity of the riparian vegetation basically eludes any quantitative relations with the physical and other vegetal characteristics of the torrent transects. Copyright © 2018 Elsevier B.V. All rights reserved.

  2. 130. Photographic copy of historic photo, June 30, 1931 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    130. Photographic copy of historic photo, June 30, 1931 (original print filed in Record Group 115, National Archives, Washington, D.C.). OWYHEE DAM UNDER CONSTRUCTION; ALL STEEL FOR RING GATE STRUCTURE IN PLACE. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  3. 13. VIEW SHOWING MOST OF THE PERIMETER FROM SPILLWAY BOX ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. VIEW SHOWING MOST OF THE PERIMETER FROM SPILLWAY BOX TO END OF EAST DAM. FOREGROUND VIEW SHOWS TRIPLE WALL CONSTRUCTION OF TONGUE AND GROOVE PLANKING USED IN CRIBBING - Three Bears Lake & Dams, North of Marias Pass, East Glacier Park, Glacier County, MT

  4. New evidence of Yangtze delta recession after closing of the Three Gorges Dam

    PubMed Central

    Luo, X. X.; Yang, S. L.; Wang, R. S.; Zhang, C. Y.; Li, P.

    2017-01-01

    Many deltas are likely undergoing net erosion because of rapid decreases in riverine sediment supply and rising global sea levels. However, detecting erosion in subaqueous deltas is usually difficult because of the lack of bathymetric data. In this study, by comparing bathymetric data between 1981 and 2012 and surficial sediment grain sizes from the Yangtze subaqueous delta front over the last three decades, we found severe erosion and significant sediment coarsening in recent years since the construction of Three Gorges Dam (TGD), the largest dam in the world. We attributed these morphological and sedimentary variations mainly to the human-induced drastic decline of river sediment discharge. Combined with previous studies based on bathymetric data from different areas of the same delta, we theorize that the Yangtze subaqueous delta is experiencing overall (net) erosion, although local accumulation was also noted. We expect that the Yangtze sediment discharge will further decrease in the near future because of construction of new dams and delta recession will continue to occur. PMID:28145520

  5. Impact of Climate Change and Human Intervention on River Flow Regimes

    NASA Astrophysics Data System (ADS)

    Singh, Rajendra; Mittal, Neha; Mishra, Ashok

    2017-04-01

    Climate change and human interventions like dam construction bring freshwater ecosystem under stress by changing flow regime. It is important to analyse their impact at a regional scale along with changes in the extremes of temperature and precipitation which further modify the flow regime components such as magnitude, timing, frequency, duration, and rate of change of flow. In this study, the Kangsabati river is chosen to analyse the hydrological alterations in its flow regime caused by dam, climate change and their combined impact using Soil and Water Assessment Tool (SWAT) and the Indicators of Hydrologic Alteration (IHA) program based on the Range of Variability Approach (RVA). Results show that flow variability is significantly reduced due to dam construction with high flows getting absorbed and pre-monsoon low flows being augmented by the reservoir. Climate change alone reduces the high peaks whereas a combination of dam and climate change significantly reduces variability by affecting both high and low flows, thereby further disrupting the functioning of riverine ecosystems. Analysis shows that in the Kangsabati basin, influence of dam is greater than that of the climate change, thereby emphasising the significance of direct human intervention. Keywords: Climate change, human impact, flow regime, Kangsabati river, SWAT, IHA, RVA.

  6. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    NASA Astrophysics Data System (ADS)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  7. Flood hydrology and dam-breach hydraulic analyses of five reservoirs in Colorado

    USGS Publications Warehouse

    Stevens, Michael R.; Hoogestraat, Galen K.

    2013-01-01

    The U.S. Department of Agriculture Forest Service has identified hazard concerns for areas downstream from five Colorado dams on Forest Service land. In 2009, the U.S. Geological Survey, in cooperation with the Forest Service, initiated a flood hydrology analysis to estimate the areal extent of potential downstream flood inundation and hazard to downstream life, property, and infrastructure if dam breach occurs. Readily available information was used for dam-breach assessments of five small Colorado reservoirs (Balman Reservoir, Crystal Lake, Manitou Park Lake, McGinnis Lake, and Million Reservoir) that are impounded by an earthen dam, and no new data were collected for hydraulic modeling. For each reservoir, two dam-breach scenarios were modeled: (1) the dam is overtopped but does not fail (break), and (2) the dam is overtopped and dam-break occurs. The dam-breach scenarios were modeled in response to the 100-year recurrence, 500-year recurrence, and the probable maximum precipitation, 24-hour duration rainstorms to predict downstream flooding. For each dam-breach and storm scenario, a flood inundation map was constructed to estimate the extent of flooding in areas of concern downstream from each dam. Simulation results of the dam-break scenarios were used to determine the hazard classification of the dam structure (high, significant, or low), which is primarily based on the potential for loss of life and property damage resulting from the predicted downstream flooding.

  8. Incorporation of Fine-Grained Sediment Erodibility Measurements into Sediment Transport Modeling, Capitol Lake, Washington

    USGS Publications Warehouse

    Stevens, Andrew W.; Gelfenbaum, Guy; Elias, Edwin; Jones, Craig

    2008-01-01

    Capitol Lake was created in 1951 with the construction of a concrete dam and control gate that prevented salt-water intrusion into the newly formed lake and regulated flow of the Deschutes River into southern Puget Sound. Physical processes associated with the former tidally dominated estuary were altered, and the dam structure itself likely caused an increase in retention of sediment flowing into the lake from the Deschutes River. Several efforts to manage sediment accumulation in the lake, including dredging and the construction of sediment traps upriver, failed to stop the lake from filling with sediment. The Deschutes Estuary Feasibility Study (DEFS) was carried out to evaluate the possibility of removing the dam and restoring estuarine processes as an alternative ongoing lake management. An important component of DEFS was the creation of a hydrodynamic and sediment transport model of the restored Deschutes Estuary. Results from model simulations indicated that estuarine processes would be restored under each of four restoration alternatives, and that over time, the restored estuary would have morphological features similar to the predam estuary. The model also predicted that after dam-removal, a large portion of the sediment eroded from the lake bottom would be deposited near the Port of Olympia and a marina located in lower Budd Inlet seaward of the present dam. The volume of sediment transported downstream was a critical piece of information that managers needed to estimate the total cost of the proposed restoration project. However, the ability of the model to predict the magnitude of sediment transport in general and, in particular, the volume of sediment deposition in the port and marina was limited by a lack of information on the erodibility of fine-grained sediments in Capitol Lake. Cores at several sites throughout Capitol Lake were collected between October 31 and November 1, 2007. The erodibility of sediments in the cores was later determined in the lab with Sedflume, an apparatus for measuring sediment erosion-parameters. In this report, we present results of the characterization of fine-grained sediment erodibility within Capitol Lake. The erodibility data were incorporated into the previously developed hydrodynamic and sediment transport model. Model simulations using the measured erodibility parameters were conducted to provide more robust estimates of the overall magnitudes and spatial patterns of sediment transport resulting from restoration of the Deschutes Estuary.

  9. National Dam Safety Program. Union Lake Dam (MO 30225), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1980-12-01

    report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to...enter the complete contract or grant number(s) under which the wo-ieported was accomplished. Leave blank in in-house reports. Block 9. Performing...34Research and Development Planning Summary," which identifies the program element, project, task area, and work unit or equivalent under which the work

  10. Summary Report of Advanced Hydropower Innovations and Cost Reduction Workshop at Arlington, VA, November 5 & 6, 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Connor, Patrick; Rugani, Kelsey; West, Anna

    On behalf of the U.S. Department of Energy (DOE) Wind and Water Power Technology Office (WWPTO), Oak Ridge National Laboratory (ORNL), hosted a day and half long workshop on November 5 and 6, 2015 in the Washington, D.C. metro area to discuss cost reduction opportunities in the development of hydropower projects. The workshop had a further targeted focus on the costs of small, low-head1 facilities at both non-powered dams (NPDs) and along undeveloped stream reaches (also known as New Stream-Reach Development or “NSD”). Workshop participants included a cross-section of seasoned experts, including project owners and developers, engineering and construction experts,more » conventional and next-generation equipment manufacturers, and others to identify the most promising ways to reduce costs and achieve improvements for hydropower projects.« less

  11. Assessment of Subyearling Chinook Salmon Survival through the Federal Hydropower Projects in the Main-Stem Columbia River

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skalski, J. R.; Eppard, M. B.; Ploskey, Gene R.

    2014-07-11

    High survival through hydropower projects is an essential element in the recovery of salmonid populations in the Columbia River. It is also a regulatory requirement under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) established under the Endangered Species Act. It requires dam passage survival to be ≥0.96 and ≥0.93 for spring and summer outmigrating juvenile salmonids, respectively, and estimated with a standard error ≤ 0.015. An innovative virtual/paired-release design was used to estimate dam passage survival, defined as survival from the face of a dam to the tailrace mixing zone. A coordinated four-dam study was conductedmore » during the 2012 summer outmigration using 14,026 run-of-river subyearling Chinook salmon surgically implanted with acoustic micro-transmitter (AMT) tags released at 9 different locations, and monitored on 14 different detection arrays. Each of the four estimates of dam passage survival exceeded BiOp requirements with values ranging from 0.9414 to 0.9747 and standard errors, 0.0031 to 0.0114. Two consecutive years of survival estimates must meet BiOp standards in order for a hydropower project to be in compliance with recovery requirements for a fish stock.« less

  12. Photographic copy of photograph, photographer unknown, August 1912 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, photographer unknown, August 1912 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "A VIEW OF METHOD OF DAM CONSTRUCTION" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  13. Red River of the North, Reconnaissance Report: Wild Rice River.

    DTIC Science & Technology

    1980-12-01

    2 lists the waste treatment facilities and needs of fifteen coumnities within the subbasin. Hydropower There are three dams located on the Wild Rice...potential hydroelectric sites. The dams were built primarily for flood control purposes and are classified as small-scale facilities. The main obstacles...drain a combined total area of 2,233 square miles. Several small low-water dams and a few larger impoundments have been constructed on the river and its

  14. 77 FR 73651 - North Star Hydro Services, CA LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...), proposing to study the feasibility of the Marble Bluff Dam Hydropower Project to be located at the U.S. Bureau of Reclamation's Marble Bluff dam on the Truckee River, near Nixon, Washoe County, Nevada. The... east of the existing spillway of the Marble Bluff dam. Flow diverted at the sluice gate would be used...

  15. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...

  16. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...

  17. 75 FR 13527 - Muskingum Valley Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... the feasibility of the Paint Creek Dam Project No. 13633, to be located at the existing Paint Creek Dam on Paint Creek, in Highland County, Ohio. The Paint Creek Dam is owned and operated by the U.S.... Applicant Contact: Randall Smith, 4950 Frazeysburg Road, Zanesville, OH 43701, (740) 891-5424. [[Page 13528...

  18. 54. McMILLAN DAM Photographic copy of historic photo, May ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. McMILLAN DAM - Photographic copy of historic photo, May 5, 1938 (original print in '1938 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown 'McMILLAN HEADGATE OPEN AFTER COMPLETION' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  19. AAR in concrete of Asejire spillway (OYO state - Nigeria)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamaudiere, J.P.; Spaeti, F.

    1995-12-31

    The Asejire dam at Ibadan, Nigeria was constructed in the late sixties for the purpose of providing water for the city of Ibadan (presently about 4,5 million inhabitants). It is located on the Oshun river approximately fifteen miles from the city. In 1982 cracks were observed on the wing walls and although these continued to develop, no attempt was made at that time to investigate their causes and no repair was carried out. In 1989 the SGI ENGINEERING Group of Geneva, Switzerland was appointed as the consultant for the complete refurbishment of the Asejire water scheme. The consortium Degremont-Poat-Clemessy wasmore » awarded the contract for the project. The African Development Bank and the Nigerian Government have provided the loan to finance the project.« less

  20. Coralville Reservoir Water Quality Project

    DTIC Science & Technology

    2006-05-01

    Description of the Area and Scope of the Project The Coralville flood control dam is located in Johnson County, Iowa , about three miles north of Iowa City...out of the reservoir. USGS 05453100 Iowa River at Marengo, IA USGS 05453520 Iowa River below Coralville Dam near Coralville , IA max min average...26: Pesticides in Fish. Coralville Reservoir Water Quality Pesticides in Fish Reservoir (Near Lake McBride Spillway) Downstream ( Iowa

  1. 77 FR 68757 - Clean River Power MR-1, LLC; Clean River Power MR-2, LLC; Clean River Power MR-3, LLC; Clean...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... environmental analysis at this time. n. The proposed Beverly Lock and Dam Water Power Project would be located... River; (3) two turbine-generator units providing a combined installed capacity of 3.0 megawatts (MW); (4... about 17,853 megawatt-hours (MWh). The proposed Devola Lock and Dam Water Power Project would be located...

  2. Impact of the Three-Gorges Dam and water transfer project on Changjiang floods

    NASA Astrophysics Data System (ADS)

    Nakayama, Tadanobu; Shankman, David

    2013-01-01

    Increasing frequency of severe floods on the middle and lower Changjiang (Yangtze) River during the past few decades can be attributed to both abnormal monsoon rainfall and landscape changes that include extensive deforestation affecting river sedimentation, and shrinking lakes and levee construction that reduced the areas available for floodwater storage. The Three-Gorges Dam (TGD) and the South-to-North Water Transfer Project (SNWTP) will also affect frequency and intensity of severe floods in the Poyang Lake region of the middle Changjiang. Process-based National Integrated Catchment-based Eco-hydrology (NICE) model predicts that the TGD will increase flood risk during the early summer monsoon against the original justifications for building the dam, relating to complex river-lake-groundwater interactions. Several scenarios predict that morphological change will increase flood risk around the lake. This indicates the importance of managing both flood discharge and sediment deposition for the entire basin. Further, the authors assessed the impact of sand mining in the lake after its prohibition on the Changjiang, and clarified that alternative scenario of sand mining in lakes currently disconnected from the mainstream would reduce the flood risk to a greater extent than intensive dredging along junction channel. Because dry biomasses simulated by the model were linearly related to the Time-Integrated Normalized Difference Vegetation Index (TINDVI) estimated from satellite images, its decadal gradient during 1982-1999 showed a spatially heterogeneous distribution and generally decreasing trends beside the lakes, indicating that the increases in lake reclamation and the resultant decrease in rice productivity are closely related to the hydrologic changes. This integrated approach could help to minimize flood damage and promote better decisions addressing sustainable development.

  3. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    NASA Astrophysics Data System (ADS)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  4. Effectiveness of sediment-control techniques used during highway construction in central Pennsylvania

    USGS Publications Warehouse

    Reed, Lloyd A.

    1978-01-01

    A different method for controlling erosion and sediment transport during highway construction was used in each of four adjacent drainage basins in central Pennsylvania. The basins ranged in size from 240 to 490 acres (97 to 198 hectares), and the area disturbed by highway construction in each basin ranged from 20 to 48 acres (8 to 19 hectares). Sediment discharge was measured from each basin for 3 years before construction began and for 2 years during construction. In one of the basins affected by the construction, three offstream ponds were constructed to intercept runoff from the construction area before it reached the stream. In another basin, a large onstream pond was constructed to trap runoff from the construction area after it reached the stream. In a third area, seeding, mulching, and rock dams were used to limit erosion. In the fourth area, no sediment controls were used. The effectiveness of the various sediment-control measures were determined by comparing the sediment loads transported from the basins with sediment controls to those without controls. For most storms the offstream ponds trapped about 60 percent of the sediment that reached them. The large onstream pond had a trap efficiency of about 80 percent, however, it remained turbid and kept the stream flow turbid for long periods following storm periods. Samples of runoff water from the construction area were collected above and below rock dams to determine the reduction in sediment as the flow passed through the device. Rock dams in streams had a trap efficiency of about 5 percent. Seeding and mulching may reduce sediment discharge by 20 percent during construction, and straw bales placed to trap runoff water may reduce sediment loads downstream by 5 percent.

  5. 75 FR 50777 - Minidoka Dam Spillway Replacement, Minidoka County, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ... INFORMATION: Minidoka Dam impounds Lake Walcott and is a feature of Reclamation's Minidoka Project. They are... numerous locations. In addition, the potential for ice damage to the stoplog piers requires that reservoir...

  6. Photographic copy of photograph, photographer unknown, August 1912 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, photographer unknown, August 1912 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "METHOD OF CONSTRUCTING DAM AFTER REMOVING OF TRESTLE" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  7. Model study of RCC stepped spillways with sloped converging training walls

    USDA-ARS?s Scientific Manuscript database

    Approximately half of the over 11,000 small watershed dams designed and constructed under the supervision of the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) will reach the end of their planned service life within the next 10 years. Many of these dams...

  8. Environmental management through sluice gated bed-dam: a revived strategy for the control of Anopheles fluviatilis breeding in streams

    PubMed Central

    Sahu, S.S.; Gunasekaran, K.; Jambulingam, P.

    2014-01-01

    Background & objectives: Integrated vector management (IVM) emphasizes sustainable eco-friendly methods and minimal use of chemicals. In this context, the present study highlights the environmental control of breeding of Anopheles fluviatilis, the primary malaria vector, through water management in a natural stream in Koraput district, Odisha, India. Methods: The District Rural Development Agency (DRDA), Koraput, constructed two bed-dams across streams, one in Barigaon and the other in Pipalapodar village. The bed-dam in the former village was fitted with two sluice gates whereas the bed dam constructed in the latter village was without the sluice gate. The sluice gates were opened once in a week on a fixed day to flush out the water from the dam. Anopheles immatures were sampled systematically in the streams using a dipper for density measurement and species composition. Results: There was a reduction of 84.9 per cent in the proportion of positive dips for Anopheles larvae/pupae and a reduction of 98.4 per cent in immature density (number/dip) of An. fluviatilis in the experimental downstream compared to the control following opening of the sluice gates. Interpretation & conclusions: Our findins showed that opening of sluice gates of the bed-dam regularly once in a week resulted in the control of vector breeding in the downstream due to the flushing effect of the water released with a high flow from the bed-dam that stagnated water in the upstream. The outcome of the study encourages upscaling this measure to other areas, wherever feasible. PMID:25297364

  9. Research on evaluation methods for water regulation ability of dams in the Huai River Basin

    NASA Astrophysics Data System (ADS)

    Shan, G. H.; Lv, S. F.; Ma, K.

    2016-08-01

    Water environment protection is a global and urgent problem that requires correct and precise evaluation. Evaluation methods have been studied for many years; however, there is a lack of research on the methods of assessing the water regulation ability of dams. Currently, evaluating the ability of dams has become a practical and significant research orientation because of the global water crisis, and the lack of effective ways to manage a dam's regulation ability has only compounded this. This paper firstly constructs seven evaluation factors and then develops two evaluation approaches to implement the factors according to the features of the problem. Dams of the Yin Shang ecological control section in the Huai He River basin are selected as an example to demonstrate the method. The results show that the evaluation approaches can produce better and more practical suggestions for dam managers.

  10. National Dam Safety Program. Lake Ashroe Dam (NJ00023), Delaware River Basin, Branch of Big Flat Brook, Sussex County, New Jersey. Phase I Inspection Report.

    DTIC Science & Technology

    1981-03-01

    mi. - 24 hour). The Corps of Engineers has recommended the use of the SCS triangular unit hydrograph with the curvilinear transformation. Hydrologic ...construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam’s general condition...FURNISHED US BY THE SPONSORING AGENCY. ALTHOUGH IT IS RECOGNIZED THAT CERTAIN PORTIONS ARE ILLEGIBLE, IT IS BEING RELEASED IN THE INTEREST OF MAKING

  11. National Program for Inspection of Non-Federal Dams. Collins Company Upper Dam (CT 00674), Connecticut River Basin, Canton, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    Engineering Division p 0 CAR WE H FRZIAN, NENBER Design Branch Engineering Division J SEPE FIN~EGAN, JR.,CIV ater Control Branch * Engineering Division...Operator g. Purpose of Dam h. Design and Construction History i. Normal Operational Procedures 1.3 PERTINENT DATA ........................... 4 a...Tunnel i. Spillways j. Regulating Outlets SECTION 2: ENGINEERING DATA 2.1 DESIGN .............................. 9 a. Available Data b. Design Features c

  12. Nile River, Lake Nasser, Aswan High Dam, Egypt

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Aswan High Dam, 2.5 miles across and 364 feet high, (24.0N, 33.0E) completed in 1971, was constructed to supply cheap hydroelectric power to both Egypt and Sudan by impounding, controling and regulating the flood waters of the Nile River in Lake Nasser, the world's second largest artifical lake. The lake extends over 500 miles in length, covers an area of some 2,000 square miles and is as much as 350 feet deep at the face of the dam.

  13. 76 FR 44899 - FFP Missouri 17, LLC; BOST2 Hydroelectric LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... at the U.S. Army Corps of Engineers' (Corps) Columbia Lock & Dam, located on the Ouachita River near... & Dam Hydroelectric Project No. 13824-000 would consist of: (1) Two to four compact bulb turbines, with... Dam; (2) a 40-foot x 60-foot control building located on the South Carolina side of the river; and (3...

  14. 77 FR 62511 - Soule Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ...,400-foot-long conduit tunnel; (5) a powerhouse with approximate dimensions of 80 feet wide by 160 feet.... The proposed project would consist of the following: (1) A 265- foot-high, 903-foot-long Main dam; (2) a 265-foot-high, 2,024 feet-long Saddle dam adjacent to the main dam; (3) a storage reservoir with a...

  15. 9. Photographic copy of photograph. (Source: National Archives Photo Collection, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photographic copy of photograph. (Source: National Archives Photo Collection, Denver, NN-366-114, Box 12, Photo 4464) Rebuilt Rock Creek Diversion Dam. Intake structure for canal is at left with suliceway and overflow section to right. April 24, 1950. - Bitter Root Irrigation Project, Rock Creek Diversion Dam, One mile east of Como Dam, west of U.S. Highway 93, Darby, Ravalli County, MT

  16. 24. DETAIL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. DETAIL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER AT NORTH END OF DAM/SPILLWAY; WATER FLOWING THROUGH FISH LADDER IS VISIBLE AT BOTTOM. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  17. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...

  18. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...

  19. [Impact of people's social behavior on schistosomiasis transmission in the Three Gorges Reservoir area].

    PubMed

    Zhang, Hui-Juan; Zhu, Rong; Wu, Cheng-Guo; Guo, Jia-Gang

    2007-06-01

    To investigate the changes in natural ecology and social environment after the construction of the dam in the Three Gorges Reservoir area, and to understand the social behavior status and education backgrounds of the local residents, and to analyze the potential impact of these factors on schistosomiasis spreading. Data of nature and social economy after the construction of the dam in the Three Gorge area were collected, and a cross-sectional study with questionnaire survey on information including social demographic characteristics, people's production and life style, knowledge about schistosomiasis was conducted among natives, emigrations. After the construction of the dam, as the stream became slower, the water-level fluctuating zone on the bank of the reservoir was formed. The main source of drinking water and daily life activity are mainly depends on the river supplying (accounting about 68.7% and 75.8%, respectively); due to the needs of farming, washing cloths and vegetables, 45.6% of resident had a close contact with river water. People with away-from-home employment among emigrations were increased from 5.7% to 18.7%. The proportion of using hygienic lavatory was 88.6%. The main source of water for drinking and daily life among emigrations was tap water (85.4% and 87.0%). The residents had no awareness about the health hazard for schistosomiasis, with less health information The natural environment of reservoir areas and the life style are risk factors for the spread of schistosomiasis. The improved sanitation condition and the economy construction after the construction of the dam is propitious to keeping away from the introduction of schistosomiasis. However, people with away-from-home employment among emigrations are still at risk of schistosomiasis.

  20. National Program for Inspection of Non-Federal Dams. Miller Pond Dam (CT 00154), Thames River Basin, Waterford, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    Phase I Investigation; however, the investigation is intended to identify any need for such studies . In reviewing this report, it should be realized that...need for more detailed hydrologic and hydraulic studies , considering the size of the dam, its general condition and the downstream damage potential. The...and/or further study . 1-1 I 1.2 DESCRIPTION OF PROJECT a. Location - The dam is located on Hunt’s Brook in a rural area of the Town of Waterford

  1. Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology

    DTIC Science & Technology

    1988-08-01

    current design of Seven Oaks Dam that would extend use of the dam beyond the expected project life of 100 years, is to market the sediment that...aggregate). Marketing the sediment deposited behind the dam would serve the dual purpose of extending the useful life of the dam by restoring reservoir...o ..... UCG 𔃿P 0- 54 Pine Tree Canyon 12 .Lies north of Mojave ............. 35.0 59,500 1: Aug 1931 )5 Cinermn Creek near Tehachapi

  2. National Program for Inspection of Non-Federal Dams. Mashhpaug Pond Spillway (CT 00640), Dike (CT 01699), Dam (CT 01700), Quinebaug River Basin, Union, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1981-03-01

    south- erly end marks the beginning of Bigelow Brook. Masha - paug Pond is located just south of Interstate Route 86 and the Massachusetts...cannot be controlled at this structure since it has no outlet works. 3. Spillway and Appurtenances: The spillway at Masha - pauq Pond is a reinforced...these sites. 4 4 0 h. Design and Construction History: Facilities at Masha - paug Pond were originally constructed in 1740 for the generation of

  3. National Dam Inspection Program. North Lake Dam (NDI I.D. Number PA-00268, PennDER I.D. Number 52-180), Delaware River Basin, Branch of Hornbecks Creek, Pike County, Pennsylvania. Phase I Inspection Report,

    DTIC Science & Technology

    1981-01-01

    12 6.1 Visual Observations ..... ............... . 12 6.2 Design and Construction Techniques .......... . 13 6.3 Past Performance...Techniques. No information is available that details the methods of design and/or construction. 6.3 Past Performance. No records relative to the...Inc., New York, 1959. 8. Weir Experiments, Coefficients, and Formulas, R. E. Horton, Water Supply and Irrigation Paper No. 200, Department of the

  4. Lower Methow tributaries intensive effectiveness monitoring study. Interim report

    USGS Publications Warehouse

    Martens, Kyle D.; Connolly, Patrick J.

    2008-01-01

    Actions have been taken to replace diversion dams in lower Beaver Creek with a series of rock vortex weirs. Some of these diversion dams have been in place for over 100 years, and they have impaired or completely blocked upstream migration of fish. Three diversion dams were replaced in 2003 (Lower Stokes, Thurlow Transfer, and Upper Stokes), and a forth diversion dam was replaced in 2004 (Fort-Thurlow). These vortex weirs were designed and installed under the supervision of U.S. Bureau of Reclamation (BOR) engineers and completed in accordance to National Marine Fisheries Service (NMFS) and Washington Department of Fisheries and Wildlife (WDFW) fish passage criteria. The projects were designed to meet fish species recovery needs described by the Endangered Species Act (ESA) and the “BiOp” issued by NMFS (2000a). Since no specific guidelines have been identified to date specifically addressing diversion dams, WDFW and NMFS guidelines are being considered as the target design and performance criteria for the sites monitored as part of this project. Where used, the vortex weirs were designed to maintain irrigation diversion capabilities while improving fish passage.

  5. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia.

    PubMed

    Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko

    2009-01-29

    Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects.

  6. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

    PubMed Central

    Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko

    2009-01-01

    Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. Conclusion This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects. PMID:19178727

  7. Report on an Archeological Survey of Five Local Protection Project Dams and Associated Drainage and Diversion Channels in Northwest El Paso, Texas.

    DTIC Science & Technology

    1976-09-30

    r AD-A126 989 REPORTTORN AN ARCHEOLOGICAL SURVEY 0F FIE LOCAL PROTECTION PROJECT CAMS A..U) EL PASO CENTENNIA MUSEUM TX R E GERALD 30 SEP 76 DACW47-6...ARCHEOLOGICAL SURVEY OF FIVE LOCAL PROTECTION PROJECT DAMS AND ASSOCIATED DRAINAGE AND DIVERSION CHANNELS IN NORTHWEST EL PASO, TEXAS By REX E. GERALD, Ph.D...gchelogical. Survey of Five Local9/07___Protection Dand Associated Drainage and Diversion a Channels in Northwest El Paso, Texas Gerald, Rex E

  8. Effects of Climate Change and Deforestation on the Amazon's Hydrological Cycle Will Require Interventions to Hydropower Planning in Brazil

    NASA Astrophysics Data System (ADS)

    Arias, M. E.; Farinosi, F.; Lee, E.; Livino, A.; Moorcroft, P. R.

    2016-12-01

    Brazil is the 2nd largest hydropower producer in the world, and this energy source will continue to be a priority in the country for the foreseeable decades. Yet, climate change is expected to alter the country's hydrological regime, in particular in the Amazon where most new hydropower development is occurring. In order to better assess the potential of hydropower projects in decades to come, it is important to evaluate how future hydrological regimes will affect their performance and suitability. This study quantifies the impacts of climate change and land use conversion on hydropower generation, and identifies mechanisms that could help energy planners to account for future changes. Using the largest network of dams in Brazil's national portfolio within a single watershed, the Tapaj's River, this study connects global and regional future environmental projections to daily river flows and operations of 37 dams with an overall potential capacity of 29.4 GW. We found that climate change could decrease hydropower potential by 477-665 MW (-6 to -8% from historical conditions) during the dry season, a critical loss since dams are expected to operate at only one third of capacity during this perioddue to the limited reservoir volume of most projects in the Amazon lowlands. Furthermore, deforestation is expected to increase the inter-annual variability in hydropower potential from 2,798 for baseline conditions to 3,764-3,899 (+967-1102) MW under future scenarios for the 2040s. Consideration of future hydrological conditions on individual dams showed that the magnitude and uncertainty of losses could be greater than 30 MW -equivalent to the total potential of some dams in the inventory- in 11 of the projects studied. Future hydrological conditions could also delay the period when maximum daily generation occurs by 22-29 days, which could have important implications to energy planning in Brazil because these run-of-river dams would no longer be able to meet the country's seasonal peak demand. This information on future changes to individual dams' performance could feed directly into the project selection process in order to adapt designs and operations to ensure the greatest benefits and least impacts from hydropower in the long term.

  9. Survey of beaver-related restoration practices in rangeland streams of the western USA

    USGS Publications Warehouse

    Pilliod, David S.; Rohde, Ashley T.; Charnley, Susan; Davee, Rachael R; Dunham, Jason B.; Gosnell, Hannah; Grant, Gordon E.; Hausner, Mark B.; Huntington, Justin L.; Nash, Caroline

    2018-01-01

    Poor condition of many streams and concerns about future droughts in the arid and semi-arid western USA have motivated novel restoration strategies aimed at accelerating recovery and increasing water resources. Translocation of beavers into formerly occupied habitats, restoration activities encouraging beaver recolonization, and instream structures mimicking the effects of beaver dams are restoration alternatives that have recently gained popularity because of their potential socioeconomic and ecological benefits. However, beaver dams and dam-like structures also harbor a history of social conflict. Hence, we identified a need to assess the use of beaver-related restoration projects in western rangelands to increase awareness and accountability, and identify gaps in scientific knowledge. We inventoried 97 projects implemented by 32 organizations, most in the last 10 years. We found that beaver-related stream restoration projects undertaken mostly involved the relocation of nuisance beavers. The most common goal was to store water, either with beaver dams or artificial structures. Beavers were often moved without regard to genetics, disease, or potential conflicts with nearby landowners. Few projects included post-implementation monitoring or planned for longer term issues, such as what happens when beavers abandon a site or when beaver dams or structures breach. Human dimensions were rarely considered and water rights and other issues were mostly unresolved or addressed through ad-hoc agreements. We conclude that the practice and implementation of beaver-related restoration has outpaced research on its efficacy and best practices. Further scientific research is necessary, especially research that informs the establishment of clear guidelines for best practices.

  10. Survey of Beaver-related Restoration Practices in Rangeland Streams of the Western USA.

    PubMed

    Pilliod, David S; Rohde, Ashley T; Charnley, Susan; Davee, Rachael R; Dunham, Jason B; Gosnell, Hannah; Grant, Gordon E; Hausner, Mark B; Huntington, Justin L; Nash, Caroline

    2018-01-01

    Poor condition of many streams and concerns about future droughts in the arid and semi-arid western USA have motivated novel restoration strategies aimed at accelerating recovery and increasing water resources. Translocation of beavers into formerly occupied habitats, restoration activities encouraging beaver recolonization, and instream structures mimicking the effects of beaver dams are restoration alternatives that have recently gained popularity because of their potential socioeconomic and ecological benefits. However, beaver dams and dam-like structures also harbor a history of social conflict. Hence, we identified a need to assess the use of beaver-related restoration projects in western rangelands to increase awareness and accountability, and identify gaps in scientific knowledge. We inventoried 97 projects implemented by 32 organizations, most in the last 10 years. We found that beaver-related stream restoration projects undertaken mostly involved the relocation of nuisance beavers. The most common goal was to store water, either with beaver dams or artificial structures. Beavers were often moved without regard to genetics, disease, or potential conflicts with nearby landowners. Few projects included post-implementation monitoring or planned for longer term issues, such as what happens when beavers abandon a site or when beaver dams or structures breach. Human dimensions were rarely considered and water rights and other issues were mostly unresolved or addressed through ad-hoc agreements. We conclude that the practice and implementation of beaver-related restoration has outpaced research on its efficacy and best practices. Further scientific research is necessary, especially research that informs the establishment of clear guidelines for best practices.

  11. Survey of Beaver-related Restoration Practices in Rangeland Streams of the Western USA

    NASA Astrophysics Data System (ADS)

    Pilliod, David S.; Rohde, Ashley T.; Charnley, Susan; Davee, Rachael R.; Dunham, Jason B.; Gosnell, Hannah; Grant, Gordon E.; Hausner, Mark B.; Huntington, Justin L.; Nash, Caroline

    2018-01-01

    Poor condition of many streams and concerns about future droughts in the arid and semi-arid western USA have motivated novel restoration strategies aimed at accelerating recovery and increasing water resources. Translocation of beavers into formerly occupied habitats, restoration activities encouraging beaver recolonization, and instream structures mimicking the effects of beaver dams are restoration alternatives that have recently gained popularity because of their potential socioeconomic and ecological benefits. However, beaver dams and dam-like structures also harbor a history of social conflict. Hence, we identified a need to assess the use of beaver-related restoration projects in western rangelands to increase awareness and accountability, and identify gaps in scientific knowledge. We inventoried 97 projects implemented by 32 organizations, most in the last 10 years. We found that beaver-related stream restoration projects undertaken mostly involved the relocation of nuisance beavers. The most common goal was to store water, either with beaver dams or artificial structures. Beavers were often moved without regard to genetics, disease, or potential conflicts with nearby landowners. Few projects included post-implementation monitoring or planned for longer term issues, such as what happens when beavers abandon a site or when beaver dams or structures breach. Human dimensions were rarely considered and water rights and other issues were mostly unresolved or addressed through ad-hoc agreements. We conclude that the practice and implementation of beaver-related restoration has outpaced research on its efficacy and best practices. Further scientific research is necessary, especially research that informs the establishment of clear guidelines for best practices.

  12. View of Diversion Dam and Flume Intake of the Childs ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Diversion Dam and Flume Intake of the Childs System at the Irving Powerhouse. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Flume Intake & Forebay, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  13. 24 CFR 203.43 - Eligibility of miscellaneous type mortgages.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Department of the Interior located within the town area of Coulee Dam, WA, acquired by the United States for the construction, operation, and maintenance of Grand Coulee Dam and its appurtenant works or of any... be located on the mortgaged property a dwelling unit designed principally for residential use for not...

  14. 17. Photocopy of a photograph (original in the Collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of a photograph (original in the Collection of the Salt Lake City Engineer's Office)--ca. 1925--GENERAL VIEW OF DOWNSTREAM SIDE OF DAM FOLLOWING COMPLETION OF CONSTRUCTION - Mountain Dell Dam, Parley's Canyon, Northwest side of I-80, West of State Route 39, Salt Lake City, Salt Lake County, UT

  15. Dams and water developments

    Treesearch

    Robert H. Schueneman

    1979-01-01

    The U.S. Army Corps of Engineers is involved in the construction and regulation of many activities relating to water resource development. Such activities include dams and reservoirs, channelization and erosion control on rivers and tributaries, and coastal works. These activities can result in an array of visual effects depending on the specific activity type and...

  16. 23. Photocopy of original photo from Corps of Engineers, Los ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) CONSTRUCTION PHOTO SHOWING CURVED CONCRETE CHUTE SPILLWAY. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA

  17. Collaborative Learning the Wiki Way

    ERIC Educational Resources Information Center

    Engstrom, Mary E.; Jewett, Dusty

    2005-01-01

    In this article, the authors feature the model, Under Control: The Damming of the Missouri River, which was designed to engage middle school students in a real-world geographic issue: investigating the long term environmental, economic and cultural impacts of the 1944 Pick-Sloan Plan, which resulted in the construction of six dams on the Missouri…

  18. The morphology and chronology of a landslide near Dillon Dam, Dillon, Colorado

    USGS Publications Warehouse

    Wahlstrom, E.E.; Nichols, T.C.

    1969-01-01

    Investigations were made of a landslide at the Dillon Dam site, Dillon, Colo., that included detailed laboratory and field analyses of the mineralogy, chemistry, and physical properties of landslide materials and the bedrock formations from which they were derived. These investigations provide an understanding of the relative importance of various factors contributing to the origin and reactivation of a landslide in overburden resting on the Morrison Formation. The landslide material consists dominantly of an aggregate of large to small angular fragments of quartzite and sandstone from the Dakota Formation, embedded in a matrix of very fine grained to colloidal clayey substances derived mainly from the upper, noncalcareous portion of the Morrison Formation. During construction of Dillon Dam and associated structures, excavation of the toe of an old, relatively stable landslide adjacent to the left abutment caused renewed movement that threatened engulfment of the intake structure at the portal of the diversion tunnel for the reservoir. Remedial measures included excavation of a large volume of the landslide material and construction of a gravel-fill coffer- dam on bedrock at the toe of the landslide. ?? 1969.

  19. Hydrologic alteration affects aquatic plant assemblages in an arid-land river

    USGS Publications Warehouse

    Vinson, Mark; Hestmark, Bennett; Barkworth, Mary E.

    2014-01-01

    We evaluated the effects of long-term flow alteration on primary-producer assemblages. In 1962, Flaming Gorge Dam was constructed on the Green River. The Yampa River has remained an unregulated hydrologically variable river that joins the Green River 100 km downstream from Flaming Gorge Dam. In the 1960s before dam construction only sparse occurrences of two macroalgae, Cladophora and Chara, and no submerged vascular plants were recorded in the Green and Yampa rivers. In 2009–2010, aquatic plants were abundant and widespread in the Green River from the dam downstream to the confluence with the Yampa River. The assemblage consisted of six vascular species, Elodea canadensis, Myriophyllum sibiricum, Nasturtium officinale,Potamogeton crispus, Potamogeton pectinatus, and Ranunculus aquatilis, the macroalgae Chara and Cladophora, and the bryophyte, Amblystegium riparium. In the Green River downstream from the Yampa River, and in the Yampa River, only sparse patches of Chara and Cladophora growing in the splash zone on boulders were collected. We attribute the observed changes in the Green River to an increase in water transparency and a reduction in suspended and bed-load sediment and high flow disturbances. The lack of hydrophyte colonization downstream from the confluence with the Yampa River has implications for understanding tributary amelioration of dam effects and for designing more natural flow-regime schedules downstream from large dams.

  20. Meta-analysis of environmental effects of beaver in relation to artificial dams

    NASA Astrophysics Data System (ADS)

    Ecke, Frauke; Levanoni, Oded; Audet, Joachim; Carlson, Peter; Eklöf, Karin; Hartman, Göran; McKie, Brendan; Ledesma, José; Segersten, Joel; Truchy, Amélie; Futter, Martyn

    2017-11-01

    Globally, artificial river impoundment, nutrient enrichment and biodiversity loss impair freshwater ecosystem integrity. Concurrently, beavers, ecosystem engineers recognized for their ability to construct dams and create ponds, are colonizing sites across the Holarctic after widespread extirpation in the 19th century, including areas outside their historical range. This has the potential to profoundly alter hydrology, hydrochemistry and aquatic ecology in both newly colonized and recolonized areas. To further our knowledge of the effects of beaver dams on aquatic environments, we extracted 1366 effect sizes from 89 studies on the impoundment of streams and lakes. Effects were assessed for 16 factors related to hydrogeomorphology, biogeochemistry, ecosystem functioning and biodiversity. Beaver dams affected concentrations of organic carbon in water, mercury in water and biota, sediment conditions and hydrological properties. There were no overall adverse effects caused by beaver dams or ponds on salmonid fish. Age was an important determinant of effect magnitude. While young ponds were a source of phosphorus, there was a tendency for phosphorus retention in older systems. Young ponds were a source methylmercury in water, but old ponds were not. To provide additional context, we also evaluated similarities and differences between environmental effects of beaver-constructed and artificial dams (767 effect sizes from 75 studies). Both are comparable in terms of effects on, for example, biodiversity, but have contrasting effects on nutrient retention and mercury. These results are important for assessing the role of beavers in enhancing and/or degrading ecological integrity in changing Holarctic freshwater systems.

  1. Baseline studies in the Elwha River ecosystem prior to dam removal: Introduction to the special issue

    USGS Publications Warehouse

    Duda, Jeffrey J.; Freilich, Jerry; Schreiner, Edward G.

    2008-01-01

    The planned removal of two dams that have been in place for over 95 years on the Elwha River provides a unique opportunity to study dam removal effects. Among the largest dams ever considered for removal, this project is compelling because 83% of the watershed lies undisturbed in Olympic National Park. Eighteen million cubic meters of sediment have accumulated in and will be released from the reservoirs, and there is potential for rehabilitating depressed Pacific salmon runs. Researchers from academia, non-profit organizations, federal and state governments, and the Lower Elwha Klallam Tribe are currently assessing baseline ecological conditions of the Elwha River as part of dam removal studies. We introduce dam removal topics, provide a brief history of the dams, and summarize the ecology of the Elwha River basin as an introduction to a special issue devoted to research in the watershed.

  2. 10. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1919. Vol. I, RG 75, Entry 655, Box 25, National Archives, Washington, DC.) ASHURST-HAYDEN (FLORENCE) DAM SITE, BRUSH DAM ACROSS THE RIVER - San Carlos Irrigation Project, Ashurst-Hayden Dam, Gila River, T4S R11E S7, Coolidge, Pinal County, AZ

  3. Quantifying and tracing sediment mobilized during the 20th century in the South River watershed, western Massachusetts

    NASA Astrophysics Data System (ADS)

    Dow, S.; Snyder, N. P.; Ouimet, W. B.; Martini, A. M.; Yellen, B.; Woodruff, J. D.; Newton, R. M.

    2016-12-01

    New England has a long history of anthropogenic activity affecting the landscape, including deforestation, land use changes, and the construction of dams. Dams in particular have the ability to impound vast quantities of sediment eroded off the landscape. The South River in western Massachusetts is an example of a watershed where mill dam construction coincided with deforestation during the 17th-19th centuries, leading to the impoundment of legacy sediment. Along the river, these deposits act as a source of sediment being released back into the river. The Conway Electric Dam (CED), a 17 m tall dam built in 1906, is located downstream of the mill dams (most of which are no longer intact), and provides a 20th century depositional record for the watershed. The purpose of this study is to quantify sedimentation behind the CED and link this to erosion of upstream mill pond and glacial sediment sources using aerial photography, sediment cores, grainsize, and geochemical analyses. We used aerial photographs to map areal changes of the reservoir from 1940-1980, and topographic profiles generated from LiDAR to estimate a volume of 244,000 m3 of sediment stored behind the CED. We dated layers in cores collected at the site with Hg and 137Cs analyses. Overall, the reservoir exhibits a decreasing rate of sediment infilling occurring from 1940-1980, except for a potentially anomalous increase from 1940-1952. Discharge data containing large storm events were compared to sediment infilling rates to identify if a frequency of large storms could account for high rates of erosion and sediment transport; however, sedimentation at the site does not appear to be solely dependent on these large storm events. Preliminary Hg analyses of deposits from the watershed upstream of the CED indicate higher concentrations in mill pond sediment than glacial sediment. Ongoing work with geochemical tracers can potentially provide a robust understanding of sources and 20th century sediment mobilization in the South River watershed, allowing us to quantify the influence of two cycles of dam construction on watershed sediment transport rates.

  4. Classification of US hydropower dams by their modes of operation

    DOE PAGES

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; ...

    2016-02-19

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  5. Classification of US hydropower dams by their modes of operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  6. 22. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING FISH LADDER AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING FISH LADDER AT NORTH END OF DAM/SPILLWAY; VIEW SHOWS SECTION OF FISH LADDER NEAR WHERE IT ENTERS THE COLUMBIA RIVER. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  7. Closed-system freezing of soils in linings and earth embankment dams

    NASA Astrophysics Data System (ADS)

    Jones, C. W.

    1981-03-01

    A brief review of studies of closed-system freezing (no source of water except that in voids) of compacted soil canal linings, laboratory and field test results show that under certain soil and temperature conditions, freezing decreases soil density near the surface, but increases density at depth. In two linings, the average density increased slightly during a 20-year period. Frost penetration measurements made during the 1978-79 winter on a 1,5-thick reservoir lining, on three earth dams under construction, and on the Teton Dam remnant are shown along with associated soil conditions, air freezing indexes, and insulating effects of snow and, for one dam, a loose soil cover.

  8. Impact of dam-building on marine life

    NASA Astrophysics Data System (ADS)

    Pandian, T. J.

    1980-03-01

    Dam-building across naturally flowing rivers tends to decrease discharge of surplus water into the sea, reduce nutrient concentration in estuaries and coastal waters, and diminish plankton blooms as well as fish landings. Depletion of nutrients and organic matter along with reduced mud and silt deposition affect benthic life on the continental shelf. Reduced mud and silt deposition leads to coastal retreat. Dams, especially those constructed for hydro-electric purposes, hinder migration of fishes and decapods. Discharge from dams can create barriers at high or low flows, cause delays, disrupt normal behavioural routine and change the travel speed of migratory animals. Where all spawners of a given population are frequently kept away from the breeding site, the population faces extinction.

  9. Assessment of 21st century drought conditions at Shasta Dam based on dynamically projected water supply conditions by a regional climate model coupled with a physically-based hydrology model.

    PubMed

    Trinh, T; Ishida, K; Kavvas, M L; Ercan, A; Carr, K

    2017-05-15

    Along with socioeconomic developments, and population increase, natural disasters around the world have recently increased the awareness of harmful impacts they cause. Among natural disasters, drought is of great interest to scientists due to the extraordinary diversity of their severity and duration. Motivated by the development of a potential approach to investigate future possible droughts in a probabilistic framework based on climate change projections, a methodology to consider thirteen future climate projections based on four emission scenarios to characterize droughts is presented. The proposed approach uses a regional climate model coupled with a physically-based hydrology model (Watershed Environmental Hydrology Hydro-Climate Model; WEHY-HCM) to generate thirteen equally likely future water supply projections. The water supply projections were compared to the current water demand for the detection of drought events and estimation of drought properties. The procedure was applied to Shasta Dam watershed to analyze drought conditions at the watershed outlet, Shasta Dam. The results suggest an increasing water scarcity at Shasta Dam with more severe and longer future drought events in some future scenarios. An important advantage of the proposed approach to the probabilistic analysis of future droughts is that it provides the drought properties of the 100-year and 200-year return periods without resorting to any extrapolation of the frequency curve. Copyright © 2017 Elsevier B.V. All rights reserved.

  10. The German-Chinese research collaboration YANGTZE-GEO: Assessing the geo-risks in the Three Gorges Reservoir area

    NASA Astrophysics Data System (ADS)

    Schönbrodt, S.; Behrens, T.; Bieger, K.; Ehret, D.; Frei, M.; Hörmann, G.; Seeber, C.; Schleier, M.; Schmalz, B.; Fohrer, N.; Kaufmann, H.; King, L.; Rohn, J.; Subklew, G.; Xiang, W.

    2012-04-01

    The river impoundment by The Three Gorges Dam leads to resettlement and land reclamation on steep slopes. As a consequence, ecosystem changes such as soil erosion, mass movements, and diffuse sediment and matter fluxes are widely expected to increase rapidly. In order to assess and analyse those ecosystem changes, the German-Chinese joint research project YANGTZE-GEO was set up in 2008. Within the framework of YANGTZE-GEO five German universities (Tuebingen, Erlangen, Giessen, Kiel, Potsdam) conducted studies on soil erosion, mass movements, diffuse matter inputs, and land use change and vulnerability in close collaboration with Chinese scientists. The Chinese partners and institutions are according to their alphabetic order of hometown the Chinese Research Academy of Environmental Sciences (CRAES; Beijing), the Standing Office of the State Council Three Gorges Project Construction Committee (Beijing), the National Climate Centre (NCC) of the China Meteorological Administration (CMA; Beijing), the Aero Geophysical Survey and Remote Sensing for Land and Resources (AES; Beijing), the Nanjing University, the CAS Institute of Soil Science (Nanjing), the Nanjing Institute of Geography and Limnology at CAS (NIGLAS; Nanjing), the China University of Geosciences (CUG; Wuhan), the CAS Institute of Hydrobiology (Wuhan), and the China Three Gorges University (Yichang). The overall aim of YANGTZE-GEO is the development of a risk assessment and forecasting system to locate high risk areas using GIS-based erosion modelling, data mining tools for terrace condition analysis and landslide recognition, eco-hydrological modelling for diffuse matter inputs, and state-of-the-art remote sensing to assess the landscape's vulnerability. Furthermore, the project aims at the recommendation of sustainable land management systems. YANGTZE-GEO showed the relevance of such research and crucially contributes to the understanding of the dimension and dynamics of the ecological consequences of large dam projects.

  11. Assessing changes in failure probability of dams in a changing climate

    NASA Astrophysics Data System (ADS)

    Mallakpour, I.; AghaKouchak, A.; Moftakhari, H.; Ragno, E.

    2017-12-01

    Dams are crucial infrastructures and provide resilience against hydrometeorological extremes (e.g., droughts and floods). In 2017, California experienced series of flooding events terminating a 5-year drought, and leading to incidents such as structural failure of Oroville Dam's spillway. Because of large socioeconomic repercussions of such incidents, it is of paramount importance to evaluate dam failure risks associated with projected shifts in the streamflow regime. This becomes even more important as the current procedures for design of hydraulic structures (e.g., dams, bridges, spillways) are based on the so-called stationary assumption. Yet, changes in climate are anticipated to result in changes in statistics of river flow (e.g., more extreme floods) and possibly increasing the failure probability of already aging dams. Here, we examine changes in discharge under two representative concentration pathways (RCPs): RCP4.5 and RCP8.5. In this study, we used routed daily streamflow data from ten global climate models (GCMs) in order to investigate possible climate-induced changes in streamflow in northern California. Our results show that while the average flow does not show a significant change, extreme floods are projected to increase in the future. Using the extreme value theory, we estimate changes in the return periods of 50-year and 100-year floods in the current and future climates. Finally, we use the historical and future return periods to quantify changes in failure probability of dams in a warming climate.

  12. Damming the Brahmaputra: Impacts on the Resilience of Local Communities to Floods and Climate Change

    NASA Astrophysics Data System (ADS)

    Rampini, C.

    2016-12-01

    Recurrent destructive floods along the Brahmaputra river basin are a major challenge for the people and state governments of Northeast India. Climate change is expected to further exacerbate this challenge, as melting Himalayan glaciers and changes in the South Asian monsoon lead to an increase in the frequency of severe floods. At the same time, the Brahmaputra has become the focus of India's hydropower development efforts, with 140 new dams planned along its main stem and tributaries. Though these dams could provide flood protection for downstream communities, political and economic factors have led dam builders to prioritize hydroelectricity generation over flood control. Using the Ranganadi Hydroelectric Project in Arunachal Pradesh as a case study, this research investigates the effects of dam building on the resilience of downstream communities to floods that are becoming increasingly severe as a result of climate change. Findings suggest that dams in Northeast are eroding downstream communities' resilience to floods by increasing their vulnerability and reducing their adaptive capacity to these natural hazards. The risk is that, as dams and climate change jointly make the floodplains of Northeast India increasingly hazardous, uninhabitable and unproductive, they will push local communities away from these landscapes and agricultural livelihoods and towards more carbon-intensive livelihoods. More broadly this research highlights the danger of pursuing climate change mitigation and renewable energy development projects without considering their impacts on the vulnerability and adaptability of affected communities to climate change.

  13. National Dam Inspection Program. WOLFF Farm Dam, NDI Number PA-01115, DER Number 21-179. Susquehanna River Basin. Cumberland County, Pennsylvania. Phase I Inspection Report.

    DTIC Science & Technology

    1981-04-01

    PA 17324 F. Purpose: Irrigation G. Design and Construction History The dam was designed by the owner with assistance from the local Soil ...assistance of the local office of the Soil Conservation Service. Drawings were not prepared for the facilities. It is unknown what the original design...a sandy soil and could be easily eroded if overtopping would occur. A small subsidence area was noticed near the downstream toe over the 12-inch

  14. National Dam Safety Program. Moon Valley Dam (MO 11597), Missouri - Kansas City Basin, Boone County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1981-08-01

    Design 6 2.2 Construction 6 2.3 Operation 6 2.4 Geology 6 2.5 Evaluation 6 SECTION 3 - VISUAL INSPECTION 3.1 Findings 7 3.2 Evaluation 9 SECTION 4...Downstream of Dam 9 Erosion Behind East Wingwall 10 Erosion and Debris Behind West Wingwall 11 Diagonal Crack in East Wingwall 12 West Wingwall...2.0 H to approximately 1.0 V on 6.0 H. (6) Zoning - Unknown. (7) Impervious core - Unknown. (8) Cutoff - Unknown. ( 9 ) Grout curtain - Unknown. h

  15. Modified rockfall catch fence Mayflower Creek - Detroit Dam : final report.

    DOT National Transportation Integrated Search

    1988-08-08

    The experimental features project is located on the North Santiam Highway (#162) between Mayflower Creek and Detroit Dam, approximately 40 miles east of Salem. Here access is limited and the slope is nonuniform. To deal with the constant problem of f...

  16. Modified rockfall catch fence Mayflower Creek - Detroit Dam : interim Report.

    DOT National Transportation Integrated Search

    1986-07-01

    This experimental features project is located on the North Santiam Highway (#162) between Mayflower Creek and Detroit Dam, approximately 40 miles east of Salem. Here access is limited and the slope is non-uniform. To deal with the problem of falling ...

  17. View of Stehr Lake from FS 502 looking upstream (northeast). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Stehr Lake from FS 502 looking upstream (northeast). Vehicle at right center is parked on earthen Upper Stehr Lake Dam. - Childs-Irving Hydroelectric Project, Childs System, Stehr Lake & Dams, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  18. VIEW OF DOWNSTREAM SIDE OF CHECK DAM, CONCRETE SPILLWAY WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF DOWNSTREAM SIDE OF CHECK DAM, CONCRETE SPILLWAY WITH MORTARED ROCK WALLS, AND CIPPOLETTI WEIR ON TUMALO RESERVOIR FEED CANAL NEAR COLLINS ROAD (IN BACKGROUND). LOOKING NORTHEAST - Tumalo Irrigation District, Tumalo Project, West of Deschutes River, Tumalo, Deschutes County, OR

  19. Large-scale degradation of Amazonian freshwater ecosystems

    NASA Astrophysics Data System (ADS)

    Castello, L.; Macedo, M.

    2016-12-01

    The integrity of freshwater ecosystems depends on their hydrological connectivity with land, water, and climate systems. Hydrological connectivity regulates the structure and function of Amazonian freshwater ecosystems and the provisioning of services that sustain local populations. However, the hydrological connectivity of Amazonian freshwater ecosystems is increasingly disrupted by construction of dams, mining, land-cover changes, and global climate change. This review analyzes these drivers of degradation; evaluates their impacts on hydrological connectivity; and identifies policy deficiencies that hinder freshwater ecosystem protection. There are 155 large hydroelectric dams in operation, 21 dams under construction, and there will be only three free-flowing tributaries if all 277 planned dams for the Basin are built. Land-cover changes driven by mining, dam and road construction, and agriculture and cattle ranching have already affected 20% of the Basin and up to 50% of riparian forests in some regions. Global climate change will likely exacerbate these impacts by creating warmer and dryer conditions, with less predictable rainfall and more extreme events (e.g. droughts and floods). The resulting hydrological alterations are rapidly degrading freshwater ecosystems both independently and via complex feedbacks and synergistic interactions. The ecosystem impacts include biodiversity loss, warmer stream temperatures, stronger and more frequent floodplain fires, and changes to biogeochemical cycles, transport of organic and inorganic materials, and freshwater community structure and function. The impacts also include reductions in water quality, fish yields, and availability of water for navigation, power generation, and human use. This degradation of Amazonian freshwater ecosystems cannot be curbed presently because existing policies are inconsistent across the Basin, ignore cumulative effects, and do not consider the hydrological connectivity of freshwater ecosystems. Maintaining the integrity of these freshwater ecosystems requires a basin-wide research and policy framework to understand and manage hydrological connectivity across multiple spatial scales and jurisdictional boundaries.

  20. 77 FR 2974 - Longview Energy Exchange, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... system; (2) a single lower reservoir dam constructed of earth fill materials with an internal dam drainage system; (3) concrete inlet-outlet structures at both upper reservoirs equipped with trash racks..., using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name...

Top